WorldWideScience

Sample records for zwischenlager nord interim

  1. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  2. Die Energiewerke Nord GmbH. From operator of a decommissioned Russian nuclear power plant to one of Europe's leading decommissioning companies

    International Nuclear Information System (INIS)

    Philipp, Marlies

    2011-01-01

    EWN GmbH is a state-owned company with these duties: - decommissioning and demolition of the Greifswald and Rheinsberg nuclear power stations; - safe operation of the Zwischenlager Nord interim store; - development of the 'Lubminer Heide' industrial and commercial estate. Other projects for which EWN GmbH uses its know-how: - disposal of 120 decommissioned Russian nuclear submarines in Murmansk; - decommissioning and dismantling of the Juelich, NRW, AVR experimental reactor; - demolition of nuclear plants; running the Central Decontamination Operations Department at Karlsruhe, BW. Since 2008, EWN GmbH has held 25% of the shares of Deutsche Gesellschaft zum Bau- und Betrieb von Endlagern fuer Abfallstoffe mbH (DBE), a firm building and operating nuclear repositories. (orig.)

  3. Radioactive waste interim storage in Germany

    International Nuclear Information System (INIS)

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  4. Centralized interim storage facility for radioactive wastes at Wuerenlingen (ZWILAG)

    International Nuclear Information System (INIS)

    Lutz, H.R.; Schnetzler, U.

    1994-01-01

    Radioactive waste management in Switzerland is the responsibility of the waste producers; in this respect, the law requires permanent, safe management of the wastes by means of final disposal. Nagra is responsible for the research and development work associated with final disposal. Processing of the wastes into a form suitable for disposal, as well as interim storage, remain the responsibility of the waste producers. In order to supplement the existing conditioning and storage facilities at the nuclear power plants and to replace the outdated waste treatment plant at the Paul Scherrer Institute (PSI) at Wuerenlingen, the operators of the Swiss nuclear power plants are planning a joint treatment and storage facility at the PSI-East site. The organisation ''Zwischenlager Wuerenlingen AG'', which was set up at the beginning of 1990, has been entrusted with this task. (author) 4 figs

  5. META-NORD

    DEFF Research Database (Denmark)

    Vasilejev, Andrejs; Pedersen, Bolette Sandford; De Smeth, Koenraad

    2011-01-01

    This position paper presents META-NORD project which develops Nordic and Baltic part of the European open language resource infrastructure. META-NORD works on assembling, linking across languages, and making widely available the basic language resources used by developers, professionals...

  6. Nordsøen Movie Maker

    DEFF Research Database (Denmark)

    2013-01-01

    Tag på ekspedition under havets overflade med Nordsøen Movie Maker, hvor din tur i Nordsøen Oceanarium får et helt nyt virtuelt lag. Rejs ud til de syv destinationer og hold øje med de unikke ‘moviespots‘ i nærheden af akvarierne. Her kan du med Nordsøen Movie Maker filme og dokumentere dine...... oplevelser med legesyge sæler, susende hvirvelstrømme og gigantiske klumpfisk. Nordsøen Movie Maker giver filmen et ekstra virtuelt lag, og via augmented reality bliver der tilføjet seje og morsomme, animerede specialeffekter. 1) Download app’en 2) Find et moviespot ved ekspeditionsposterne i Nordsøen...... Oceanarium. Kig efter klaptræet. 3) Vælg den rigtige post i app’en og start med at filme dit filmklip Downloader du app’en før dit besøg, er du allerede klar til at starte ekspeditionen i det øjeblik, du træder ind i Oceanariets tusmørke, hvor de første moviespots er gemt. God fornøjelse med ekspeditionen...

  7. 16 NORD computers for Europeen fusion research

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    16 computers of the NORD type, mannfactured by Nordata's French subsidiary, have been ordered for the JET data acquisition and storage system. 15 of the computers are of the NORD-100 model and the 16th is a NORD-500. The computers are to be arranged in a 'double star' configuration, developed by CERN. CAMAC Serial Highway is to be used for long communications paths, using fibre optics. The operating system is SINTRAN and the programming languages FORTRAN, NODAC, NORD PL, PASCAL and BASIC may be used. (JIW)

  8. Work Programme 2010. Nordic Energy Regulators (NordREG)

    Energy Technology Data Exchange (ETDEWEB)

    2010-02-15

    The Nordic regulators' cooperation through NordREG is based on a strong consensus and common understanding of the Nordic market. Through mutual efforts and contributions NordREG members identify areas of work that can create added value for the Nordic electricity market. NordREG works by exchanging information and views, mapping and analysing energy market issues and by delivering statements and reports for harmonisation and improvement. In this, the regulators aim at identifying areas where NordREG can take joint action to influence Nordic or European electricity market development. NordREGs key focus in 2010 is the work towards a common Nordic retail market and the emphasis is on promoting a legal and institutional framework that supports this goal

  9. KulturarvNord - Styrker, svagheder, muligheder og trusler

    DEFF Research Database (Denmark)

    Mark, Stine

    KulturarvNord – styrker, svagheder, muligheder og trusler er udarbejdet af forskningscenteret INCEVIDA, Aalborg Universitet 2012, og gennemført i et samarbejde mellem INCEVIDA og museumsnetværket KulturarvNord. I rapporten tages der udgangspunkt i empirisk materiale indhentet via interviews med n...... nøglepersoner i KulturarvNord. På baggrund af dette materiale er der udarbejdet en SWOT-analyse, som sætter fokus på museumsnetværkets styrker, svagheder, muligheder og trusler mhp. det fremtidige samarbejde....

  10. Le commerce du Nord

    OpenAIRE

    Pourchasse, Pierrick; Bouëdec, Gérard Le

    2015-01-01

    Au XVIIIe siècle, la France s'approvisionne abondamment dans les pays du Nord : bois, chanvre et goudron de la Baltique, tonnellerie de Poméranie, pêche de rogue de Norvège, graines de lin de Courlande, barres de fer suédois… Sa balance commerciale est pourtant positive grâce aux sels, aux vins et surtout des nouvelles marchandises coloniales. Or, la plupart des transactions passent par l’incontournable intermédiaire hollandais. Les explications sur l’absence des Français dans le Nord sont re...

  11. Nord Stream - Venemaa erioperatsioon / Marko Mihkelson

    Index Scriptorium Estoniae

    Mihkelson, Marko, 1969-

    2008-01-01

    Ilmunud ka: Eesti Eest = Za Estoniju : Izdanije objedinenija "Sojuz Otetshestva i Res Publica" 20. juuni 2008, lk. 6. Riigikogu liige kirjutab Nord Streami gaasijuhtmeprojektist, leides, et Eesti kohus on oma seisukohti kindlalt kaitsta. Nord Streami kaasus kinnitab selgelt, kui hädavajalik on Euroopa Liidu ühine energiapoliitika ning selgem arusaam energiajulgeoleku tähtsusest mitte üksnes majanduslike, vaid ka poliitiliste otsuste juures

  12. Nord-Stream-Antrag stösst auf Ablehnung

    Index Scriptorium Estoniae

    2012-01-01

    Nord Stream küsib Eestilt taas uuringuluba. 2007 ei rahuldanud vabariigi valitsus Nord Stream AG uurimisloa taotlust. Andrus Ansip ja Mart Laar on seisukohal, et tuleks jääda kord tehtud otsuse juurde

  13. NordVal: A Nordic system for validation of alternative microbiological methods

    DEFF Research Database (Denmark)

    Qvist, Sven

    2007-01-01

    NordVal was created in 1999 by the Nordic Committee of Senior Officials for Food Issues under the Nordic Council of Ministers. The Committee adopted the following objective for NordVal: NordVal evaluates the performance and field of application of alternative microbiological methods. This includes...... analyses of food, water, feed, animal faeces and food environmental samples in the Nordic countries. NordVal is managed by a steering group, which is appointed by the National Food Administrations in Denmark, Finland, Iceland, Norway and Sweden. The background for creation of NordVal was a Danish...... validation system (DanVal) established in 1995 to cope with a need to validate alternative methods to be used in the Danish Salmonella Action Program. The program attracted considerable attention in the other Nordic countries. NordVal has elaborated a number of documents, which describe the requirements...

  14. The Nord-Limousin uraniferous province. Its three main deposits; La province uranifere du Nord-Limousin. Ses trois principaux gisements

    Energy Technology Data Exchange (ETDEWEB)

    Sarcia, J.A. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1958-07-01

    Les Sagnes, Margnac and Les Brugeauds are the three main known deposits in the Nord-Limousin region, a rich uraniferous area; already being mined, they have only been partially explored so far, and one can safely hope for further extensions: in fact, some of these hopes have come true already. Each of these three deposits correspond to a type frequently to be found in the region, and the three of them together represent the characteristics of the Nord-Limousin uraniferous region: that is why they were selected. (author) [French] Les trois gisements decrits ici, les Sagnes, Margnac, les Brugeauds, sont les principaux actuellement connus dans la region du Nord-Limousin, si riche en gites uraniferes; deja en exploitation, ils ne sont encore que partiellement explores, et tous les espoirs d'extension laterale sont permis: certains sont deja en voie de realisation. Chacun d'eux correspond a un type frequent dans la region, et ils illustrent a eux trois les caracteristiques de la province uranifere du Nord-Limousin: c'est la raison de leur choix. (auteur)

  15. The Nord-Limousin uraniferous province. Its three main deposits; La province uranifere du Nord-Limousin. Ses trois principaux gisements

    Energy Technology Data Exchange (ETDEWEB)

    Sarcia, J A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1958-07-01

    Les Sagnes, Margnac and Les Brugeauds are the three main known deposits in the Nord-Limousin region, a rich uraniferous area; already being mined, they have only been partially explored so far, and one can safely hope for further extensions: in fact, some of these hopes have come true already. Each of these three deposits correspond to a type frequently to be found in the region, and the three of them together represent the characteristics of the Nord-Limousin uraniferous region: that is why they were selected. (author) [French] Les trois gisements decrits ici, les Sagnes, Margnac, les Brugeauds, sont les principaux actuellement connus dans la region du Nord-Limousin, si riche en gites uraniferes; deja en exploitation, ils ne sont encore que partiellement explores, et tous les espoirs d'extension laterale sont permis: certains sont deja en voie de realisation. Chacun d'eux correspond a un type frequent dans la region, et ils illustrent a eux trois les caracteristiques de la province uranifere du Nord-Limousin: c'est la raison de leur choix. (auteur)

  16. pluviosite en region soudano-sahelienne au nord du cameroun

    African Journals Online (AJOL)

    AISA

    Dans le but de montrer qu'en zone soudano-sahélienne du Nord du ... principaux facteurs responsables de la variation des rendements en culture pluviale, une étude basée sur ... Mots clés : Risque climatique, pluviométrie, variation, rendement agricole, Nord Cameroun. ... d'analyse plus global et fonctionnel, à savoir,.

  17. Nord-galerii näitab noori kunstnikke / Teele Tammeorg

    Index Scriptorium Estoniae

    Tammeorg, Teele

    2010-01-01

    20. mail avati Akadeemia Nord ruumides Nord Galerii (Siili 14, Tallinn) TÜ maalikunsti eriala lõpetanud Veiko Klemmeri ja Andrus Raagi ning nende lõputööde juhendaja ja galerii ühe rajaja Jaan Elkeni maalinäitusega "Võru-Tartu-Tallinn". Galerii pakub noortele kunstnikele võimalust oma töid tasuta eksponeerida

  18. Implementation of the waste management transfer act. Requirements from a regulatory point of view

    International Nuclear Information System (INIS)

    Mueller-Dehn, Christian

    2017-01-01

    In future in Germany, the state will be responsible for financing and handling the interim and final storage of radioactive waste from nuclear power plants. With regard to interim storage, this objective is achieved with the provisions of the Waste Management Transfer Act. Regulatory implementation is based on these regulations. BGZ Gesellschaft fuer Zwischenlager mbH is responsible for interim storage on behalf of the Federal Government. Simultaneously with the transfer of interim storage facilities to BGZ a legal transfer of approval is carried out. Insofar as there is a technical, organisational or personnel conjunction with the nuclear power plant operation, which continues to exist beyond this deadline and is relevant for regulatory purposes, a regulation is made via a service contract with the BGZ. This ensures compliance with the licensing regulations. Irradiated fuel assemblies and the waste from reprocessing can be handed over to BGZ from 1 January 2019 onwards and waste with negligible heat generation can be disposed of as of the determination of their proper packaging.

  19. Implementation of the waste management transfer act. Requirements from a regulatory point of view; Zur Umsetzung des Entsorgungsuebergangsgesetzes. Anforderungen aus regulatorischer Sicht

    Energy Technology Data Exchange (ETDEWEB)

    Mueller-Dehn, Christian [PreussenElektra GmbH, Hannover (Germany). Regulierung, Grundsatzfragen

    2017-11-15

    In future in Germany, the state will be responsible for financing and handling the interim and final storage of radioactive waste from nuclear power plants. With regard to interim storage, this objective is achieved with the provisions of the Waste Management Transfer Act. Regulatory implementation is based on these regulations. BGZ Gesellschaft fuer Zwischenlager mbH is responsible for interim storage on behalf of the Federal Government. Simultaneously with the transfer of interim storage facilities to BGZ a legal transfer of approval is carried out. Insofar as there is a technical, organisational or personnel conjunction with the nuclear power plant operation, which continues to exist beyond this deadline and is relevant for regulatory purposes, a regulation is made via a service contract with the BGZ. This ensures compliance with the licensing regulations. Irradiated fuel assemblies and the waste from reprocessing can be handed over to BGZ from 1 January 2019 onwards and waste with negligible heat generation can be disposed of as of the determination of their proper packaging.

  20. Does the radiation from the interim storage in Gorleben affect the sex ratio of newborn children?; Beeinflusst die Strahlung aus dem Zwischenlager in Gorleben das Geschlechterverhaeltnis von Neugeborenen?

    Energy Technology Data Exchange (ETDEWEB)

    Engelmann, H.W.; Schulze, H.; Wede, S. [GNS Gesellschaft fuer Nuklear-Service mbH, Gorleben (Germany); Mueller, S. [Studsvik GmbH, Pforzheim (Germany)

    2015-07-01

    In the professional world but especially in public, the question is discussed whether ionizing radiation from nuclear facilities has a significant impact on the secondary sex ratio of newborn children in the vicinity of the plants. This issue is of exceptional importance in the region around Gorleben, where the opposition to nuclear facilities and activities for decades is particularly strong. At the site borders of the interim storage facility (TBL-G) of GNS the effective individual dose is about 0.2 mSv per year, mainly caused by neutron irradiation from 108 casks with high-level radioactive waste from reprocessing. In the surrounding villages there is no radiation measurable. Statistical studies allegedly have shown evidence that in some villages in the area and during certain periods, proportionately fewer girls were born in comparison to the average for the Federal Republic of Germany. Based on these purely statistical results henceforward was also alleged that neutron-induced secondary effects such as activation or secondary gamma radiation would be responsible for it. Monte Carlo calculations and special measurements yielded values of the dose at the plant border for activation products less than E-04 mSv/a and for secondary gamma radiation of about E-03 mSv/a. These results indicate that the ionizing radiation from the Gorleben interim storage facility cannot be held accountable for shifts of the secondary sex ratio.

  1. NordForm90, Malmö1990

    DEFF Research Database (Denmark)

    Jensen, Henrik; Agger, Steen

    2009-01-01

    Boghuset (se dette) er en interaktiv, ikonbaseret brugerflade til en biblioteksdatabase, som blev til i et forskningssamarbejde mellem Forskningscenter Risø og Kunstakademiets Arkitektskole. Resultatet af dette blev udstillet på NordForm90 i Malmö, og projektet omtales i udstillingens katalog på ...

  2. Prigonrieux – Le Bourg-Nord, Les Junies

    OpenAIRE

    Sandoz, Gérard

    2013-01-01

    Identifiant de l'opération archéologique : 7225529 Date de l'opération : 2009 (EX) Cette opération de diagnostic fait suite à un projet de lotissement et de construction de logements sociaux déposé par la mairie de Prigonrieux aux lieux-dits Le Bourg‑nord et Les Junies. L’intervention s’est déroulée du 2 février au 6 février 2009. Trente-deux sondages ont été réalisés ce qui représente 5 % de la surface menacée qui était de 34 683 m². Dans la partie nord du terrain, deux fossés parallèles ret...

  3. Merkel: Nord Streami on meile vaja / Kalev Kask

    Index Scriptorium Estoniae

    Kask, Kalev

    2009-01-01

    Venemaa presidendi Dmitri Medvedevi ja Saksamaa kantsleri Angela Merkeli kohtumisel käsitleti energeetikapoliitikat, D. Medvedev kutsus Rootsit üles toetama Nord Streami arendamist ning taunis Nabucco gaasijuhtme rajamist

  4. "Konsesjon til radikalere" : Norges anerkjennelse av Nord-Vietnam i 1971

    OpenAIRE

    Sørensen, Cristian H.

    2012-01-01

    Emnet for oppgaven er Norges anerkjennelse av Nord-Vietnam som en selvstendig stat. Dette skjedde i 1971 mens Nord-Vietnam var i krig med Sør-Vietnam og USA. Norge var det første NATO-landet som fattet prinsippvedtak om dette, og Danmark fulgte etter. Det hele provoserte USA i så stor grad at Nixon-administrasjonen var nær ved å kalle ambassadørene sine i Oslo og København hjem. Det var regjeringen Bratteli som stod for utførelsen av anerkjennelsen etter at Arbeiderpartiet kom tilbake til reg...

  5. Läänemeri vs Nord Stream / Ene Kaups

    Index Scriptorium Estoniae

    Kaups, Ene, 1963-

    2009-01-01

    Riigikogu võttis vastu avalduse Läänemerre kavandatava gaasijuhtmega seotud keskkonnariskidest, kus avaldatakse muret, et Nord Stream AG poolt algatatud gaasijuhtme projekti rahvusvahelise keskkonnamõju hinnangutes ei ole piisavalt arvestatud kõigi seonduvate keskkonnariskidega

  6. Nord Stream, Sweden and Baltic Sea Security

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Robert L

    2007-03-15

    In June 2006, FOI published the report: Sweden and the NEGP: a Pilot Study of the North European Gas Pipeline and Sweden's Dependence on Russian Energy, a base data report on a topic that FOI considered to be of rising importance. Much has happened since then and the NEGP has changed its name to Nord Stream and submitted an official notification on the intention of realising the project of constructing a gas pipeline from Russia to Germany via the Baltic Sea. The primary aim of this report is to discuss and analyse some of the core aspects of Nord Stream and the pipeline project with regard to the security situation for the Baltic Sea region. The report constitutes an updated version of the previous report. Most of the old report still stands valid, especially concerning the historical survey of Russia's energy policy, but the new report has additional chapters and is broader in scope concerning the consequences of the project

  7. Nord Stream, Sweden and Baltic Sea Security

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Robert L.

    2007-03-15

    In June 2006, FOI published the report: Sweden and the NEGP: a Pilot Study of the North European Gas Pipeline and Sweden's Dependence on Russian Energy, a base data report on a topic that FOI considered to be of rising importance. Much has happened since then and the NEGP has changed its name to Nord Stream and submitted an official notification on the intention of realising the project of constructing a gas pipeline from Russia to Germany via the Baltic Sea. The primary aim of this report is to discuss and analyse some of the core aspects of Nord Stream and the pipeline project with regard to the security situation for the Baltic Sea region. The report constitutes an updated version of the previous report. Most of the old report still stands valid, especially concerning the historical survey of Russia's energy policy, but the new report has additional chapters and is broader in scope concerning the consequences of the project

  8. Nord Stream, Sweden and Baltic Sea Security

    International Nuclear Information System (INIS)

    Larsson, Robert L.

    2007-03-01

    In June 2006, FOI published the report: Sweden and the NEGP: a Pilot Study of the North European Gas Pipeline and Sweden's Dependence on Russian Energy, a base data report on a topic that FOI considered to be of rising importance. Much has happened since then and the NEGP has changed its name to Nord Stream and submitted an official notification on the intention of realising the project of constructing a gas pipeline from Russia to Germany via the Baltic Sea. The primary aim of this report is to discuss and analyse some of the core aspects of Nord Stream and the pipeline project with regard to the security situation for the Baltic Sea region. The report constitutes an updated version of the previous report. Most of the old report still stands valid, especially concerning the historical survey of Russia's energy policy, but the new report has additional chapters and is broader in scope concerning the consequences of the project

  9. Ekspert: Nord Stream on kaheldav / Jaanus Piirsalu

    Index Scriptorium Estoniae

    Piirsalu, Jaanus, 1973-

    2009-01-01

    Konsultatsioonifirma East European Gas Analysis direktor Mihhail Kortšemkin arvab, et Gazprom hülgab Nord Streami projekti, kui ta ei saa Rootsi ja Soome nõusolekut ehitamiseks 2010. aasta jooksul. Tema hinnangul riskib Gazprom pankrotiga, kui hakkab korraga ehitama gaasitoru läbi Läänemere ja Musta mere

  10. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  11. Gåsetrekket i Vesterålen og Nord-Trøndelag 2004

    DEFF Research Database (Denmark)

    Tombre, I.; Madsen, J.; Bakken, J.

    for the goose species pink-footed goose Anser brachyrhynchus, barnacle goose Branta leucopsis and greylag goose Anser anser. The present report summarises goose registrations in some of the municipalities involved; Steinkjer and Inderøy in Nord-Trøndelag, Mid-Norway (pink-footed goose), and Sortland...... in Vesterålen, Northern Norway (pink-footed goose and barnacle goose). Registrations in the Nord-Trøndelag municipalities, Verdal and Levanger, are also included. Pink-footed and barnacle geese stage in Norway during spring on their way to their breeding grounds in Svalbard. In Trøndelag, the spring...... estimate of 43 000). This is probably an underestimate due to all hiding possibilities in the region, and it is assumed that at least 75 % of the Svalbard population of pink-footed goose stayed in Nord-Trøndelag in early May. Intensive scaring of geese registered at several locations in the county...

  12. Nord Stream maksis kalurid kinni / Gert D Hankewitz

    Index Scriptorium Estoniae

    Hankewitz, Gert D

    2010-01-01

    Läbi Läänemere gaasijuhet ehitav firma Nord Stream maksis Eesti kaluritele sümboolset hüvitist, vältimaks tulevikus kahjunõudeid. Väidetavalt said Eesti kalurid hüvitist vähem kui Rootsi ja Soome kalapüüdjad

  13. Teaching Religion in Public Schools: Review of Warren A. Nord, "Does God Make a Difference?"

    Science.gov (United States)

    Feinberg, Walter

    2013-01-01

    In this review of Warren Nord's "Does God Make a Difference? Taking Religion Seriously in Our Schools and Universities," Walter Feinberg provides a detailed analysis of Nord's argument that the study of religion should be constitutionally mandated as a corrective to the overwhelmingly secular course of study offered in…

  14. Bio energy heating plant heats municipal buildings in Nord-Odal; Bioenergisentral varmer kommunale bygg i Nord-Odal

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-01

    When Nord-Odal planned to build a new nursing home, they wanted to find a more environmental friendly heating system than based on oil and electricity. Several energy consultants evaluated the task. But when all consultants concluded there would be no cost benefit in this task, local experts looked into it - and because they got a long term agreement, it was possible to finance a local bio energy heat plant. (AG)

  15. Gaasitoru rajaja Nord Stream : jätkame läbirääkimisi Soomega / Tuuli Koch

    Index Scriptorium Estoniae

    Koch, Tuuli

    2007-01-01

    Eesti valitsuse otsus mitte anda Nord Streamile uurimisluba tekitas Soome keskkonnaametnikes pahameelt. Nord Stream AG esindaja Jens D. Mülleri sõnul jätkatakse torujuhtme projekti. Välispoliitika Instituudi direktori Andres Kasekampi arvates laskis Eesti käest kaasarääkimise õiguse

  16. The dynamics of risk premiums in Nord Pool's futures market

    International Nuclear Information System (INIS)

    Mork, E.

    2006-01-01

    Premiums in futures prices are usually considered through the use of 2 models: a no-arbitrage model; and the equilibrium approach or theory of normal backwardation. The no-arbitrage approach equates futures prices with spot prices, storage costs and convenience yields, and is difficult to apply to electricity markets. This paper investigated future electricity prices in Nord Pool's futures market using an equilibrium approach, which split futures prices into an expected spot price component and a risk premium component. Three main hypotheses were used: (1) that risk premiums were present in the Nord Pool futures market during the period 1997-2004; that risk premiums in the Nord Pool futures market were smaller or absent during the period of 2000 to 2002; and, that there was a significant change in risk premiums in Nord Pool's futures market after the winter of 2002-2003 due to a change in consumer hedging behaviour. Futures prices were compared to realized spot prices in their delivery periods in order to test the hypotheses. In order to estimate the futures premiums, a 1-sample test was performed on the entire period for 1, 30, 60, and 90 days before delivery of the block or month contract. The test employed the null hypothesis that the futures premiums were 0. Premiums were positive and varied between 3.7 per cent and 9.3 per cent. The purpose of the study was to determine whether risk premiums were present. Results showed that risk premiums varied over time. Two additional hypotheses were then investigated to examine whether the presence of outside speculators reduced risk premiums, and to see if a period of high prices and volatility caused more buyers to hedge in the futures market. Results showed that in the face of volatility and higher prices, consumers do not purchase fixed-price contracts which would ultimately increase futures premiums in the market. It was concluded that premiums are an important element in the pricing of Nord Pool futures and forwards

  17. Entrevista com Christiane Nord

    Directory of Open Access Journals (Sweden)

    Monique Pfau

    2014-12-01

    Full Text Available Quando pensamos em tradução e enfocamos em aspectos como "por que traduzir?" "quem será meu leitor?" "como abordar os aspectos das culturas?", certamente nos vem o nome da pesquisadora alemã Christiane Nord. No meio acadêmico dos Estudos da Tradução, dos últimos trinta anos, é provável que seu nome se faça presente como teórica importante nos cursos de tradução, na abordagem prática da formação de tradutores, enriquecendo discussões, formando perfis profissionais. Seu trabalho como teórica, professora e tradutora já trouxe um material bastante rico para pensar sobre os Estudos da Tradução e a Tarefa do Tradutor. Ela traz o funcionalismo alemão como uma teoria de tradução aplicável tanto no exercício profissional do tradutor, como na análise comparativa entre texto-fonte e texto-alvo em uma abordagem comunicativa eficiente e real. Nesta entrevista que Nord gentilmente proporcionou, recebendo-me em sua residência em Heidelberg, conversamos sobre algumas questões que aparecem em discussões com colegas que também usam a teoria funcionalista alemã para suas pesquisas e pensam em tradução enquanto teoria e prática. Nord, como lecionando uma de suas aulas, esclarece dúvidas sobre o uso da teoria na prática, sobre os primeiros passos do aprendiz em tradução até se tornar um profissional e sobre questões reais que circundam o mercado da tradução. Ela também traz algumas estratégias e técnicas que o tradutor pode adotar, dependendo do cliente e do leitor, sugerindo possíveis modos de relacionamento entre eles para que o trabalho seja satisfatório para todas as partes, defendendo o conceito de lealdade de sua teoria. A entrevistada também discute sobre a definição de convenções culturais, fazendo um paralelo ao conceito de normas (Toury, 1995 e pondera sobre seu significado, trazendo diversos exemplos reais como formas de encontrar as convenções de uma cultura. Também conversamos a respeito do

  18. Nord Stream 2: keeping the head cool

    International Nuclear Information System (INIS)

    Aoun, Marie-Claire

    2016-01-01

    Nord Stream 2 is the name of a project of a pipeline which will transport Russian natural gas into the European Union. The author first presents the context of this project announced during a forum in Saint Petersburg, and signed in september 2015 between Gazprom and several European stakeholders (Eon, BASF, Engie, Shell and OMV). The objective is for Moscow to secure its north-western European market on the long term. Some physical characteristics of the project are evoked, and the European dependence on gas imports is described. The author then discusses how European countries are divided about this project: some support it (like mainly Germany) while some others are fiercely against (Eastern European countries which complain about their loss of transfer revenues, or countries like Bulgaria, Greece and Italy about the loss of an alternative gas corridor). The project also faces legal obstacles related to patrimony separation and access of third parties to the network. Finally, and while mentioning other projects (Nord Stream 1 and South Stream), the author shows that the difficulties and problems faced by this project are a perfect illustration of a fractured European gas sector

  19. NordREG report on the price peaks in the Nordic wholesale market during winter 2009-2010. Final report

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-15

    In winter 2009-2010, prices peaked on three days. The high prices that were experienced in the majority of the Nord Pool Spot price areas initiated a study on the reasons that led to the price spikes and on the possible measures to develop the Nordic market arrangements to avoid such situations in the future. The analysis of the winter 2009-2010 events revealed that there were a number of primary causes for the occurrence of the price peaks and no single individual cause could be pinpointed to bear the key responsibility. The fact that the weather was cold all over the Nordic area in conjunction with the low availability for the Swedish nuclear generation capacity, however, could be indicated as the key underlying causes. The analysis also showed that the way the Nordic transmission capacity is allocated can be listed as an additional factor complementing to the occurrence of the price peaks. Thus, NordREG concluded that a review of the methods of calculating and allocating transmission capacity for the market should be carried out. As a part of this, an analysis that addresses the delimitation of bidding areas and maintenance planning of the transmission network infrastructure should be prepared as well. The flexibility on the demand side has not been very large in the Nordic region. However, the background study prepared by Gaia Consulting showed that even small degree of increased price elasticity could substantially cut the price peaks. This could be seen as an improvement potential of the trading system reflecting the present inability of the market participants to react on the price signals the market place provides. Therefore, NordREG sees that facilitating the appearance of a real price elastic behaviour of the users of electricity can be regarded as one of the key fixes for the problem. Furthermore, NordREG proposes that a consultancy study on how to promote demand flexibility in the Nordic market in a coherent way should be prepared. A further area for

  20. Forecasting Nord Pool day-ahead prices with an autoregressive model

    International Nuclear Information System (INIS)

    Kristiansen, Tarjei

    2012-01-01

    This paper presents a model to forecast Nord Pool hourly day-ahead prices. The model is based on but reduced in terms of estimation parameters (from 24 sets to 1) and modified to include Nordic demand and Danish wind power as exogenous variables. We model prices across all hours in the analysis period rather than across each single hour of 24 hours. By applying three model variants on Nord Pool data, we achieve a weekly mean absolute percentage error (WMAE) of around 6–7% and an hourly mean absolute percentage error (MAPE) ranging from 8% to 11%. Out of sample results yields a WMAE and an hourly MAPE of around 5%. The models enable analysts and traders to forecast hourly day-ahead prices accurately. Moreover, the models are relatively straightforward and user-friendly to implement. They can be set up in any trading organization. - Highlights: ► Forecasting Nord Pool day-ahead prices with an autoregressive model. ► The model is based on but with the set of parameters reduced from 24 to 1. ► The model includes Nordic demand and Danish wind power as exogenous variables. ► Hourly mean absolute percentage error ranges from 8% to 11%. ► Out of sample results yields a WMAE and an hourly MAPE of around 5%.

  1. Nord Stream "ründas" Gotlandil Eestit / Tuuli Koch

    Index Scriptorium Estoniae

    Koch, Tuuli

    2010-01-01

    Vene- Saksa gaasijuhtme ehituse sõlmpunktiks muutuval Gotlandil jäi Slite sadamasse Nord Streami raha eest ehitatud kaile ette mälestusmärk eestlastele ja lätlastele, kes 1944. aastal punavõimu eest põgenedes Gotlandile jõudsid. Kaart

  2. Cohort profile: the Nordic Antireflux Surgery Cohort (NordASCo).

    Science.gov (United States)

    Maret-Ouda, John; Wahlin, Karl; Artama, Miia; Brusselaers, Nele; Färkkilä, Martti; Lynge, Elsebeth; Mattsson, Fredrik; Pukkala, Eero; Romundstad, Pål; Tryggvadóttir, Laufey; Euler-Chelpin, My von; Lagergren, Jesper

    2017-06-08

    To describe a newly created all-Nordic cohort of patients with gastro-oesophageal reflux disease (GORD), entitled the Nordic Antireflux Surgery Cohort (NordASCo), which will be used to compare participants having undergone antireflux surgery with those who have not regarding risk of cancers, other diseases and mortality. Included were individuals with a GORD diagnosis recorded in any of the nationwide patient registries in the Nordic countries (Denmark, Finland, Iceland, Norway and Sweden) in 1964-2014 (with various start and end years in different countries). Data regarding cancer, other diseases and mortality were retrieved from the nationwide registries for cancer, patients and causes of death, respectively. The NordASCo includes 945 153 individuals with a diagnosis of GORD. Of these, 48 433 (5.1%) have undergone primary antireflux surgery. Median age at primary antireflux surgery ranged from 47 to 52 years in the different countries. The coding practices of GORD seem to have differed between the Nordic countries. The NordASCo will initially be used to analyse the risk of developing known or potential GORD-related cancers, that is, tumours of the oesophagus, stomach, larynx, pharynx and lung, and to evaluate the mortality in the short-term and long-term perspectives. Additionally, the cohort will be used to evaluate the risk of non-malignant respiratory conditions that might be caused by aspiration of gastric contents. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  3. Oriente within, Nord without: il meridionismo e i romantici inglesi

    Directory of Open Access Journals (Sweden)

    Luigi Cazzato

    2012-11-01

    Full Text Available Per Voltaire (1773 prima ed Hegel (2010 poi, la storia del progresso del mondo ha viaggiato seguendo il percorso geo-politico e climatico aristotelico 1: dal dispotico Oriente verso il libero Occidente; mentre per Montesquieu (1994 essa ha viaggiato anche dai paesi caldi del Sud, timorosi come i vecchi, verso i paesi freddi del Nord, coraggiosi come i giovani. L’Europa non si è vista solo come l’altro rispetto all’Oriente, ma anche come l’altro rispetto al suo Meridione: il presente moderno del Nord di contro al passato antico del Sud. Nella seconda metà del Settecento, il secolo della nascita dell’orientalismo come sapere organico all’impresa coloniale dell’Occidente, vennero gettati anche i semi della pianta del meridionismo, sapere organico all’impresa della costruzione della moderna identità europea. I romantici inglesi coltivarono questa pianta.

  4. Berliinis räägiti NordStreami venimisest / Raavo Raadik

    Index Scriptorium Estoniae

    Raadik, Raavo

    2008-01-01

    Financial Times Deutschland (FTD) ajakirjanikud vahendasid Vene gaasikontserni Gazprom juhatuse liikme Valeri Jassevi kinnitusi, et gaasijuhtme esimene osa peaks valmima 2011. aastal ja 2012. aastal peaks algama esimesed gaasitarned. Seni oli NordStream lähtunud varasematest tähtaegadest

  5. Analysis of modeling aircraft noise with the Nord2000 noise model

    Science.gov (United States)

    2012-10-31

    This report provides comparisons between AEDT/INM and the Nord 2000 Noise Models for the following parameters: ground type, simple terrain (downward slope, upward slope, hill), temperature and humidity, temperature gradients (positive and negative), ...

  6. The dynamics of risk premiums in Nord Pool's futures market

    Energy Technology Data Exchange (ETDEWEB)

    Mork, E. [Consultant, Oslo (Norway)

    2006-04-15

    Premiums in futures prices are usually considered through the use of 2 models: a no-arbitrage model; and the equilibrium approach or theory of normal backwardation. The no-arbitrage approach equates futures prices with spot prices, storage costs and convenience yields, and is difficult to apply to electricity markets. This paper investigated future electricity prices in Nord Pool's futures market using an equilibrium approach, which split futures prices into an expected spot price component and a risk premium component. Three main hypotheses were used: (1) that risk premiums were present in the Nord Pool futures market during the period 1997-2004; that risk premiums in the Nord Pool futures market were smaller or absent during the period of 2000 to 2002; and, that there was a significant change in risk premiums in Nord Pool's futures market after the winter of 2002-2003 due to a change in consumer hedging behaviour. Futures prices were compared to realized spot prices in their delivery periods in order to test the hypotheses. In order to estimate the futures premiums, a 1-sample test was performed on the entire period for 1, 30, 60, and 90 days before delivery of the block or month contract. The test employed the null hypothesis that the futures premiums were 0. Premiums were positive and varied between 3.7 per cent and 9.3 per cent. The purpose of the study was to determine whether risk premiums were present. Results showed that risk premiums varied over time. Two additional hypotheses were then investigated to examine whether the presence of outside speculators reduced risk premiums, and to see if a period of high prices and volatility caused more buyers to hedge in the futures market. Results showed that in the face of volatility and higher prices, consumers do not purchase fixed-price contracts which would ultimately increase futures premiums in the market. It was concluded that premiums are an important element in the pricing of Nord Pool futures and

  7. Spikes and memory in (Nord Pool) electricity price spot prices

    DEFF Research Database (Denmark)

    Proietti, Tomasso; Haldrup, Niels; Knapik, Oskar

    Electricity spot prices are subject to transitory sharp movements commonly referred to as spikes. The paper aims at assessing their effects on model based inferences and predictions, with reference to the Nord Pool power exchange. We identify a spike as a price value which deviates substantially...

  8. Interfaces et reconfigurations de la question Nord/Sud en Corée.

    Directory of Open Access Journals (Sweden)

    Valérie Gelézeau

    2010-12-01

    Full Text Available S’appuyant sur un travail pluridisciplinaire autour de la notion d’interface, l’article propose de nouvelles perspectives d’analyse de la question Nord/Sud en Corée en considérant la partition entre Corée du Nord et Corée du Sud non plus comme un simple contexte géopolitique mais comme une matrice structurante des deux sociétés. Trois grands types d’interfaces entre les deux Corées sont identifiés et analysés à travers plusieurs études de cas : les interfaces spatiales (la frontière inter-coréenne, la frontière sino-nord-coréenne, ou encore les enclaves économiques développées au Nord par la Corée du Sud, les interfaces sociales (la communauté des Nord-Coréens au Sud, les élites sud-coréennes originaires du Nord, ou les échanges culturels nés de l’introduction au Sud de la peinture nord-coréenne, les interfaces narratives renvoyant aux discours que chaque Corée construit sur l’Autre, que ce soient les discours officiels (manuels scolaires, agences de presse ou ceux de la fiction (cinéma. Prolongeant le travail des géographes sur la notion, l’article s’efforce de mieux décrire la géométrie du système que constitue une interface (multiplicité des plans et des niveaux de contacts, jeu des synapses et des interstices, prégnance des enclaves non seulement sur le plan spatial mais aussi sur les plans social et narratif et de reconsidérer l’extraordinaire complexité de la culture coréenne contemporaine. Malgré les divergences de vues sur l’existence même d’une interface entre les deux Corées, l’article conclut que l’usage de ce concept a contribué à mettre en évidence la prégnance de cette division au cœur des deux Corées, à tous les niveaux de la sphère sociale et jusque dans le discours des études coréennes. En exposant les frontières divisant les discours et les savoirs sur la péninsule selon un paradigme bipolaire, le concept d’interface a pu permettre de

  9. Experiența Agenției de Dezvoltare Nord în realizarea proiectelor de dezvoltare regională

    Directory of Open Access Journals (Sweden)

    Tatiana TOFAN

    2017-09-01

    Full Text Available Regiunea de Dezvoltare Nord, ca aşezare geografică, climă, rețea hidrologică, floră, faună, resurse naturale, economie, se află într-o situație bine poziționată, ceea ce-i permite să atragă investiții în propria dezvoltare regională. În articol este descrisă activitatea Agenției de Dezvoltare Regională Nord, care dispune de o experiență destul de bună în realizarea proiectelor de dezvoltare regională în Republică Moldova. La fel, ea continuă să fie un partener sigur în atragerea investițiilor străine directe în localitățile de nord ale republicii.

  10. Operational experience from the satellite fields Statfjord Nord and East; Driftserfaringer fra satellittfeltene Statfjord Nord og Oest

    Energy Technology Data Exchange (ETDEWEB)

    Retterdal, Atle; Hansen, Hans Birger [Statoil, Stavanger (Norway)

    1999-07-01

    Since production started on the satellite fields Statfjord Nord and East in 1995 and 1994, respectively, some opportunities for improvement have been discovered and realized both with respect to the subsea systems and the operational routines and philosophy. This presentation discusses the improvement projects. It is known from experience that creative ideas usually originate at the interfaces between supplier/customer, engineers with different backgrounds, or between different technologies. The interface between supplier and operator is very important for discovering creative solutions. The interface between Statoil and the suppliers of underwater equipment is not sufficiently well developed on the operational side.

  11. Nord Streami mõjudest rääkimine tõi auhinna / Madis Filippov

    Index Scriptorium Estoniae

    Filippov, Madis

    2011-01-01

    Tallinna Tehnikaülikooli juhtivteaduri Tarmo Soomere juhitud uurimisprojekt "Baltic Way" sai Läänemere organisatsioonide konsortsiumi Bonus auhinna Nord Streami võimalike keskkonnamõjude tutvustamise eest

  12. (Sorghum bicolor (L.) Moench) du Nord du Burkina Faso

    African Journals Online (AJOL)

    SARAH

    29 déc. 2014 ... sorghos à grains sucrés ont un cycle court et arrivent donc à maturité avant les autres sorghos et le mil d'où leur exploitation comme aliment de soudure par les paysans. L'organisation de la diversité morphologique des accessions de sorghos à grains sucrés du Nord du. Burkina autour principalement des ...

  13. Nord Stream liigub seatud eesmärgi poole / Sebastian Sass ; intervjueerinud Sirje Rank

    Index Scriptorium Estoniae

    Sass, Sebastian

    2009-01-01

    Nord Streami loataotluste juhi kinnitusel püsib gaasitoru projekt probleemidest hoolimata graafikus ja tarned peaksid algama 2011. aastal. Vt. samas: Finantsjuht: Läänemere gaasitoru rahata ei jää

  14. Interim overdentures.

    Science.gov (United States)

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  15. Nord Streami keskkonnamõjude aruanne jätab tähelepanuta Läänemere eripära / Madis Filippov ; kommenteerinud Ivar Puura, Tarmo Soomere, Endel Lippmaa

    Index Scriptorium Estoniae

    Filippov, Madis

    2009-01-01

    Teadlastes tekitavad ärevust Vene-Saksa ühisfirma Nord-Streami poolt Läänemerre kavandatava gaasitoru keskkonnamõjud. Artiklis on juttu ka Eesti Teaduste Akadeemia kirjast president Toomas Hendrik Ilvesele ja peaminister Andrus Ansipile sooviga moodustada professionaalne komisjon, mis töötaks läbi Nord Streami gaasijuhtme keskkonnamõju hindamise materjalid. Vt. samas: Dioksiinide kontsentratsioon setetes; Nord Streami gaasijuhe

  16. Culture, Values and Social Basis of Northern Italian Centrifugal Regionalism. A Contextual Political Analysis of the Lega Nord

    OpenAIRE

    Biorcio , Roberto; Vitale , Tommaso

    2011-01-01

    The Lega Nord intended to create a party which represented the whole of the northern regions, capable to defend their interests and culture. If we examine the profile of people that voted for the Lega Nord, we find some discordant features compared to the project. A large majority of the party’s electorate naturally supports federalism and devolution. However, the party’s electorate paradoxically displays value trends and convictions that, for many aspects are in countertendency compared to t...

  17. 7 CFR 1738.21 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  18. 7 CFR 1735.75 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  19. Interpretation of Leadership and Organizational Culture in PostNord

    OpenAIRE

    Hansen, Viktor Satterup Morell; Nissen, Peter Ravnborg; Pak, Kyeong Hwoa

    2016-01-01

    In this paper, there will be an interpretivist analysis of the organizational structure and leadership in PostNord, for the period of 2009 to 2016. The research attempts to disclose the espoused values and underlying assumption in the internal structure of the organization, and also the leadership of Lars G. Nordström, Lars Idermark and Håkan Ericsson. The theory will utilize Edgar H. Schein’s definition of organizational culture and leadership by Partington 3 schools of thought from project ...

  20. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  1. NordStream : "Toru tuleb niikuinii" / Jens Müller ; interv. Külli-Riin Tigasson

    Index Scriptorium Estoniae

    Müller, Jens

    2007-01-01

    Nord Streami pressiesindaja hinnangul on Eesti majandusvööndis gaasijuhtme keskkonnauuringute mittelubamine keskkonna seisukohalt kahjulik, nüüd ei saa võrrelda, kas keskkonnasõbralikum oleks ehitada gaasitoru läbi Soome või läbi Eesti majandusvööndi

  2. Réseautage d'entreprises au Moyen-Orient et en Afrique du Nord ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Les réseaux sociaux sont d'importantes sources de conseils pour les entrepreneurs du Moyen-Orient et de l'Afrique du Nord (région MOAN) et ils contribuent à leur réussite. Un nouveau projet de recherche a pour but de favoriser la collaboration entre des chercheurs du Global Entrepreneurship Monitor (GEM) et la ...

  3. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  4. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  5. Comparative study of air quality by the North Sea and Baltic Sea; Vergleichsuntersuchungen der Luftqualitaet an Nord- und Ostsee

    Energy Technology Data Exchange (ETDEWEB)

    Moriske, H.J.; Turowski, E.; Klar, A.; Schoendube, M.; Ebert, G.; Konieczny, L. [Umweltbundesamt, Berlin (Germany). Inst. fuer Wasser-, Boden- und Lufthygiene

    2000-01-01

    Air quality measurements were carried out in the North Sea and Baltic Sea regions. The results are summarized in this contribution from the hygienic view. [German] Im Rahmen eines Forschungsprojektes des Umweltbundesamtes, das zwischen 1996 und 1998 mit dem Titel 'Erfassung gasfoermiger und partikelfoermiger Bestandteile der Umgebungsluft an Nord- und Ostsee - Untersuchungen zur hygienischen Bedeutung des maritimen Aerosols' durchgefuehrt wurde, sollte die Frage unterschiedlicher Luftqualitaet an Nord- und Ostsee beantwortet werden und eine aktuelle Bestandsaufnahme vorgenommen werden. Der Artikel fasst die Forschungsergebnisse aus hygienischer Sicht zusammen. (orig./SR)

  6. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  7. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  8. La coopération culturelle dans l’eurorégion Nord-Transmanche : une institutionnalisation sans institution ?

    Directory of Open Access Journals (Sweden)

    Thomas Perrin

    2012-01-01

    Full Text Available Cet article porte sur l’action culturelle transfrontalière dans l’eurorégion Nord-Transmanche. Cette organisation de coopération territoriale a associé, de 1991 à 2004, la région française du Nord-Pas-de-Calais au Comté anglais du Kent et aux trois régions belges : Région wallonne, Région flamande et Région de Bruxelles-Capitale. La dimension pionnière et historique de cette eurorégion, mais également le fait qu’elle n’a pas perduré, permettent d’illustrer à la fois les potentialités, limites et paradoxes de la mobilisation de la culture dans le contexte des organisations de coopération territoriale. Si le processus d’institutionnalisation de l’eurorégion en tant que telle est resté inachevé, l’espace Nord-Transmanche reste un espace de coopération dynamique, en particulier dans le domaine culturel et la référence eurorégionale reste significative pour de nombreux acteurs. Cet exemple interroge ainsi les enjeux et la réalité de la construction d’une Europe des territoires et de la culture, notamment par rapport aux discours institutionnels dont ces questions font généralement l’objet.

  9. Moyen-Orient et Afrique du Nord | CRDI - Centre de recherches pour ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Depuis les soulèvements de 2011, la région connaît des changements sans précédent. Cela a entraîné une croissance inégale, une vulnérabilité économique, une démocratie fragile et un taux de chômage élevé, en particulier chez les femmes et les jeunes. Au Moyen-Orient et en Afrique du Nord, les économies ...

  10. Nord Stream : täidame kõik Eesti nõudmised / Matthias Warnig ; interv. Jan Jõgis-Laats

    Index Scriptorium Estoniae

    Warnig, Matthias

    2007-01-01

    Nord Streami tegevdirektor pakub võimalust, et Eesti esindajad viibiksid gaasitrassi uuringutel, samuti võivad esindajad teha ette teatamata reide. Firma on valmis arutama kõike, mis on vajalik protsessi kontrollimiseks ja usalduse tekitamiseks

  11. La population du Moyen-Orient et de l'Afrique du Nord contribue ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    29 avr. 2016 ... Le degré d'apport au contenu varie grandement d'une population à l'autre. Si les habitants du Moyen-Orient et de l'Afrique du Nord (région MENA) utilisent Wikipédia, ils y contribuent cependant moins que les populations d'autres régions du monde. Le contenu au sujet de la région MENA est, le plus ...

  12. Environnement alimentaire de la vente au détail et expériences de magasinage dans les collectivités des Premières nations du nord des provinces

    Directory of Open Access Journals (Sweden)

    Kristin Burnett

    2017-01-01

    Full Text Available Introduction : Cet article porte sur l'environnement de la vente d’aliments dans les collectivités des Premières nations du nord des provinces, en particulier sur la concurrence éventuelle dans la vente au détail de la North West Company (NWC ainsi que sur les expériences d'achats alimentaires de la population vivant dans le Nord canadien. Méthodologie : Nous avons utilisé deux méthodologies pour évaluer l’environnement alimentaire de la vente au détail dans le Nord. D’abord, nous avons cartographié les détaillants en alimentation du Nord afin d’examiner le degré de concurrence au détail dans les régions nordiques, en prêtant une attention particulière aux collectivités qui ne sont pas accessibles à l’année par la route. Ensuite, nous avons enquêté auprès des personnes vivant dans les collectivités du Nord canadien à propos de leurs expériences d’achat au détail et de magasinage. Résultats : Cinquante‑quatre pour cent des collectivités du nord des provinces et du Grand Nord n’avaient aucune épicerie en concurrence avec la NWC. Les provinces comptant les plus fortes proportions de collectivités nordiques sans concurrence dans la vente au détail étaient l’Ontario (87 %, la Saskatchewan (83 % et le Manitoba (72 %. Les participants au sondage (n = 92 ont fait état de leurs préoccupations quant à leurs expériences d'achat dans trois grands secteurs : le coût des aliments, la qualité et la fraîcheur des aliments et la disponibilité de certains aliments. Conclusion : La concurrence dans la vente au détail est limitée dans le nord des provinces. Au Manitoba, en Saskatchewan et en Ontario, la NWC ne fait face à aucune concurrence dans au moins 70 % des collectivités nordiques. Les consommateurs du Nord canadien considèrent que les aliments nutritifs sont peu abordables, et ils souhaitent avoir accès à un plus grand choix d’aliments périssables en bon état.

  13. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  14. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  15. NORD STREAM 2 and its Soft Power – an Unfolding Playground for the European Union

    Directory of Open Access Journals (Sweden)

    Roxana Ioana Banciu

    2016-06-01

    Full Text Available This paper focuses on the Nord Stream 2 pipeline in a double reflection (Russia - the candle, Germany - the mirror handling one particular aspect that influences Russia-EU relations since the Ukrainian factor emerged as a playground for both East and West tectonic plates - namely the energy sector. It is vital for any global power to understand this approach in order to reach people’s minds, in order to emerge as leaders on the world map and to build a strong perception over a political scene. A recently debated subject is Nord Stream 2. The reason why I have chosen to explore this subject is because I am very interested in how Kremlin seeks to have an exclusive control over Eastern Europe, given the full debate in the last three years. In this thesis I will also discuss some important elements of the Russian Soft Power over Europe introducing the plot of South Stream project.

  16. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  17. Addendum to IFMIF-CDA interim report

    Energy Technology Data Exchange (ETDEWEB)

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  18. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  19. Prevalence and associated factors of DSM-V insomnia in Norway: the Nord-Trøndelag Health Study (HUNT 3).

    Science.gov (United States)

    Uhlig, Benjamin Langsæter; Sand, Trond; Odegård, Siv Steinsmo; Hagen, Knut

    2014-06-01

    Many studies have assessed the prevalence of insomnia, but the influence of non-participants has largely been ignored. The objective of the present study was to estimate the prevalence and associated factors of insomnia in a large adult population using DSM-V (diagnostic and statistical manual of mental disorders, 5th ed.) criteria, also taking non-participants into account. This cross-sectional study used data from a questionnaire in The Nord-Trøndelag Health Study (HUNT 3) performed in 2006-2008, and a subsequent non-participant study. The total adult population (n=93,860 aged > or =20 years) of Nord-Trøndelag County, Norway, was invited. Of these, 40,535 responded to the insomnia questionnaire. Among 42,024 eligible non-participants, 6918 (17%) responded to two insomnia questions. Insomnia was diagnosed by applying modified DSM-V criteria. The age-adjusted insomnia prevalence was estimated using the age distribution of all adult inhabitants of Nord-Trøndelag. Supplementary prevalence data were estimated by extrapolating data from the non-participant study. Additionally, the association between insomnia and self-reported health was estimated, adjusting for known confounders. The total age-adjusted prevalence of insomnia was 7.1% (95% confidence interval [CI], 6.9-7.4) (8.6% for women, 5.5% for men). Adjusting for non-participants, the prevalence estimate changed to 7.9% (95% CI, 7.3-8.6) (9.4% for women, 6.4% for men). Insomnia was more than eight times more likely (OR, 8.3; 95% CI, 6.2-11.1) among individuals with very poor versus very good self-reported health, adjusting for age, gender, employment status, chronic musculoskeletal complaints, anxiety and depression. The adjusted insomnia prevalence estimate in Nord-Trøndelag was 7.9%. Insomnia was strongly associated with poor self-reported health. Copyright © 2014 Elsevier B.V. All rights reserved.

  20. Sustainable Solutions for Nuclear used Fuels Interim Storage

    International Nuclear Information System (INIS)

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  1. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  2. Interim storage of radioactive waste packages

    International Nuclear Information System (INIS)

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  3. Nonlocal relativistic diffusion (NoRD) model of cosmic ray propagation

    International Nuclear Information System (INIS)

    Uchaikin, V V; Sibatov, R T

    2017-01-01

    The problem of physical interpretation of the nonlocal relativistic diffusion (NoRD model) for cosmic ray transport in the Galaxy is discussed. The model accounts for the turbulent character of the interstellar medium and the relativistic principle of the speed limitation. Involving fractional calculus and non-Gaussian Lévy statistics yields numerical results compatible with observation data. A special attention is paid to the knee problem. The relativistic speed limit requirement steepens theoretical background spectrum at certain energies, and the position of the break, its sharpness and slopes of asymptotes depend on D α ( E ) and α . (paper)

  4. Karst et ressources en eau au moyen Atlas nord-oriental

    OpenAIRE

    Taous, Ali; Tribak, Abdellatif; Obda, Khalid; Baena Escudero, Rafael; López Lara, Enrique Javier; Miranda Bonilla, Jose

    2009-01-01

    Le Moyen Atlas nord-oriental se caractérise par des paysages kartisques hérités et actuels très diversifiés. En fait, les roches carbonatées du Jurassique, bien représentées dans cette région montagneuse, ont subi une karstification ancienne, depuis la fin du Tertiaire et au cours du Quaternaire. Actuallement, la karstogenèse est encore active en raison des conditions géologiques, morphostructurales et bioclimatiques favorables: couches de roches carbonatées inclinées et plissées, climat médi...

  5. NKS NordRisk. Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    International Nuclear Information System (INIS)

    Havskov Soerensen, J.; Baklanov, A.; Mahura, A.; Lauritzen, Bent; Mikkelsen, Torben

    2008-07-01

    Within the NKS NordRisk project, 'Nuclear risk from atmospheric dispersion in Northern Europe', the NKS NordRisk Atlas has been developed. The atlas describes risks from hypothetical long-range atmospheric dispersion and deposition of radionuclides from selected nuclear risk sites in the Northern Hemisphere. A number of case studies of long-term long-range atmospheric transport and deposition of radionuclides has been developed, based on two years of meteorological data. Radionuclide concentrations in air and radionuclide depositions have been evaluated and examples of long-term averages of the dispersion and deposition and of the variability around these mean values are provided. (au)

  6. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  7. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  8. NKS NordRisk. Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    Energy Technology Data Exchange (ETDEWEB)

    Havskov Soerensen, J.; Baklanov, A.; Mahura, A. (Danish Meteorological Institute, Copenhagen (Denmark)); Lauritzen, Bent; Mikkelsen, Torben (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy, Roskilde (Denmark))

    2008-07-15

    Within the NKS NordRisk project, 'Nuclear risk from atmospheric dispersion in Northern Europe', the NKS NordRisk Atlas has been developed. The atlas describes risks from hypothetical long-range atmospheric dispersion and deposition of radionuclides from selected nuclear risk sites in the Northern Hemisphere. A number of case studies of long-term long-range atmospheric transport and deposition of radionuclides has been developed, based on two years of meteorological data. Radionuclide concentrations in air and radionuclide depositions have been evaluated and examples of long-term averages of the dispersion and deposition and of the variability around these mean values are provided. (au)

  9. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  10. L'avenir du Moyen-Orient et de l'Afrique du Nord passe par la ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    10 janv. 2013 ... Centre de recherches pour le développement international Gouvernement du Canada ... du Nord passe par la croissance partagée et l'économie de marché ... vivant en région éloignée aient un accès égal aux possibilités économiques. ... visant à trouver de nouveaux modes d'action pouvant contribuer au ...

  11. Nord Stream on väljakutse kodanikuühiskonnale / Tarmo Soomere ; üles kirjutanud Juune Holvandus

    Index Scriptorium Estoniae

    Soomere, Tarmo, 1957-

    2009-01-01

    Gaasijuhe Nord Stream läbi Läänemere Venemaalt Saksamaale ei tähenda ainult kasulikku äritehingut. Küsimus on ennekõike ohutust keskkonnast ja sellest, et riigid peavad kaaluma ka seda, mida järeltulevad põlved asjast arvavad. Akadeemik Tarmo Soomere selgitab rahvusvahelistesse vetesse rajatava gaasijuhtme temaatikat.

  12. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  13. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  14. Living better in Nord-Pas de Calais region. For an energy turn and societal transformations - Full report, Synthesis

    International Nuclear Information System (INIS)

    2015-12-01

    In 2008, the NGO Virage-energie Nord-Pas de Calais published a scenario of nuclear power phaseout including objectives of reduction of green gas emissions in the region of Nord-Pas de Calais. In 2013, Virage-energie Nord-Pas de Calais published Scenarios on energy sufficiency and societal transformations: the results of a research project on the evaluation of energy savings potentials from public policies and lifestyle changes. Using data models and assumptions, this study has highlighted that energy sufficiency could generate energy savings from 26 % to 40 %. Global scenarios presented in this report, realised with the financial support of ADEME and regional council of the region Nord-Pas de Calais in partnership with two academic laboratories (TVES, University of Lille 1 - Science and Technologies; and Ceraps, University of Lille 2 - Health and Law), complete previous works with a global vision for the future energetic and social systems. Scenarios explore interactions between energy, lifestyles, agriculture, food habits, consumer goods, industry, buildings, transport and employment, in order to identify and to reduce human, social, economic and environmental vulnerabilities to energetic crisis. Energy sufficiency and resilience are at the heart of this research. Energy sufficiency is a voluntary and organized strategy to reduce energy consumption through lifestyles changes and societal transformations. Energy sufficiency is different from energy efficiency, which concerns only improvement of technical performances in order to reduce energy consumption of a system (building, vehicle, etc.). Sufficiency re-evaluates uses and needs of energy, but also imaginary and culture of a society and its individual and collective organisations. Resilience is the capacity for a system (territory, population, etc.) to absorb a perturbation, to reorganize itself and to continue to remain in a functionally similar state. Through three possible scenarios for the territory and the

  15. La integración energética de los países nórdicos -Nord Pool-: lecciones para otros mercados

    Directory of Open Access Journals (Sweden)

    John Jairo García Rendón

    2006-01-01

    Full Text Available Este artículo describe el proceso de integración del mercado eléctrico de los países nórdicos -Nord Pool-, además de establecer algunas reflexiones sobre dicha experiencia, las cuales pueden ser importantes para regiones que se encuentran en el mismo proceso, como es el caso de la Comunidad Andina de Naciones -CAN-. Inicialmente hace alusión a la teoría que fundamenta el intercambio de bienes y servicios y los principios económicos que justifican la integración de mercados para luego concentrarse en el caso del Nord Pool, examinando el proceso y sus principales resultados.

  16. 4 years of successful knowledge transfer - the nuclear technology training center of the TUeV Nord Group

    International Nuclear Information System (INIS)

    Willenbockel, I.; Tietze, U.

    2007-01-01

    In connection with the 2002 amendment to the German Atomic Energy Act, the topics of generational change and maintenance of competence grew in importance and necessitated new solution approaches. To this end, various activities were launched, with the aim of conducting conceptual analyses of these topics. Examples include the 'National Competence Network for Nuclear Technology' (Nationaler Kompetenzverbund fuer Kerntechnik), various networks established by colleges and universities, the 'Knowledge Management for the Maintenance and Transfer of Competence in Reactor Safety' (Wissensmanagement zum Kompetenzerhalt und -transfer in der Reaktorsicherheit) workshop held in 2001 in Garching near Munich (Germany) and the 'Ad-hoc Workgroup on the Maintenance of Competence' (Ad-hoc-Arbeitskreis Kompetenzerhalt) of the VdTUeV. The nuclear technology departments of the TUeV Nord Group were aware of te challenges associated with the generational change early on. By establishing the 'Nuclear Technology Training Center' (Ausbildungszentrum fuer Kerntechnik, AfK), the TUeV Nord Group intended to ensure the required knowledge transfer during the generational change as well as maintain the renowned high qualification as regards the subject of nuclear technology and thus continue to provide - in the sense of social responsibility - crucial contribution to the long-term safety of nuclear plants. Four years have passed since the training center held the first courses in the fall of 2002. Up to now, more than 350 participants have been trained in the courses conducted by the AfK. In the opinion of the TUeV Nord Group, the activities of the AfK have laid the foundation for a successful change of generations within the group's nuclear technology organizations. (orig.)

  17. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  18. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  19. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  20. Nord Stream ei näe takistusi Eesti käest uuringuloa saamisel / Jan Jõgis-Laats

    Index Scriptorium Estoniae

    Jõgis-Laats, Jan

    2007-01-01

    Vene-Saksa gaasijuhet rajava Nord Streami piirkonnajuhi Sebastian Sassi sõnul on ettevõte täitnud kõik nõuded ja esitanud kogu nõutud info ning seetõttu usub, et uuringuteks saadakse Eestilt luba. Välisminister Urmas Paeti väitel saab valitsus selgete ja kaalukate argumentide korral uuringute loa andmisest keelduda. Lisa: Teadlased soovitavad keelduda

  1. Réduction de la vulnérabilité des pasteurs du nord du Kenya | CRDI ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    21 avr. 2011 ... Les recherches menées par l'ONG kényane Practical Action sur la vulnérabilité climatique des communautés pastorales des districts de Mandera et de Turkana, dans le nord du pays, jette de la lumière sur les conséquences biophysiques, sociales et économiques de la sécheresse dans ces régions ...

  2. Nord-Cotentin radioecology group: an innovative experiment in pluralist expertise; Le groupe Radioecologie Nord-Cotentin: une experience originale d'expertise pluraliste

    Energy Technology Data Exchange (ETDEWEB)

    Lochard, J.; Schneider, T.; Crouail, P. [Centre d' Etude sur l' Evaluation de la Protection dans le Domaine Nucleaire, 92 - Fontenay-aux-Roses (France); Heriard-Dubreuil, G.; Gadbois, S. [Mutadis, 92 - Fontenay aux Roses (France); Oudiz, A. [CEA Fontenay-aux-Roses, 92 (France). Inst. de Protection et de Surete Nucleaire

    2000-11-01

    This report gives a synthetic overview of the procedure and the main results of the GRNC (Nord-Cotentin Radioecology Group), and lessons that can be drawn from it. In particular, it is intended to demonstrate the innovation of the pluralist approach adopted by summarizing its historic context and differences with the similar experiment carried out in the United Kingdom for the Sellafield nuclear site 1. It also presents the different steps in the evaluation of exposures and risks associated with ionising radiation. Finally, it emphasizes prospects opened as a result of the Group's experiment on the involvement of stakeholders in the evaluation and management of radiological risk. This final aspect could open up new means of ''preventively'' dealing with questions related to risks to health and the environment inherent to industrial activities. (A.L.B.)

  3. Evaluation of ERA-Interim precipitation data in complex terrain

    Science.gov (United States)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  4. 12 CFR 541.18 - Interim Federal savings association.

    Science.gov (United States)

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  5. O modelo Funcionalista de Christiane Nord aliado ao dispositivo de Sequências Didáticas: norteamentos para o Ensino de Tradução

    OpenAIRE

    Valdecy Oliveira Pontes; Livya Lea Oliveira Pereira

    2017-01-01

    Abordagens mais recentes nos Estudos da Tradução partem do princípio de que não se traduz uma língua/cultura, mas textos. Na perspectiva da Tradução Funcionalista, esses não podem ser compreendidos à parte de seu contexto comunicativo, fato que justifica a proximidade do Ensino de Tradução com o conhecimento sobre gêneros textuais, destacada, inclusive, por Nord (2012). Assim, a partir da perspectiva teórica funcionalista de Christiane Nord (1991, 1994, 1996, 2012) para o ensino de tradução e...

  6. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  7. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  8. La integración energética de los países nórdicos —Nord Pool—: lecciones para otros mercados

    Directory of Open Access Journals (Sweden)

    Carlos Mario Palacios

    2006-06-01

    Full Text Available Este artículo describe el proceso de integración del mercado eléctrico de los países nórdicos —Nord Pool—, además de establecer algunas reflexiones sobre dicha experiencia, las cuales pueden ser importantes para regiones que se encuentran en el mismo proceso, como es el caso de la Comunidad Andina de Naciones —CAN—. Inicialmente hace alusión a la teoría que fundamenta el intercambio de bienes y servicios y los principios económicos que justifican la integración de mercados para luego concentrarse en el caso del Nord Pool, examinando el proceso y sus principales resultados.

  9. Highlights from the CERN/ESO/NordForsk ''Gender in Physics Day''

    Science.gov (United States)

    Primas, F.; Guinot, G.; Strandberg, L.

    2017-03-01

    In their role as observers on the EU Gender Equality Network in the European Research Area (GENERA) project, funded under the Horizon 2020 framework, CERN, ESO and NordForsk joined forces and organised a Gender in Physics Day at the CERN Globe of Science and Innovation. The one-day conference aimed to examine innovative activities promoting gender equality, and to discuss gender-oriented policies and best practice in the European Research Area (with special emphasis on intergovernmental organisations), as well as the importance of building solid networks. The event was very well attended and was declared a success. The main highlights of the meeting are reported.

  10. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  11. Source apportionment of particles at Station Nord, North East Greenland during 2008–2010 using COPREM and PMF analysis

    DEFF Research Database (Denmark)

    Nguyen, Quynh; Skov, Henrik; Sørensen, Lise Lotte

    2013-01-01

    In order to develop strategies for controlling and reducing Arctic air pollution, there is a need to understand the basic mechanisms for determining the fate of air pollution in the Arctic. Sources of atmospheric particles at Station Nord (81° 36' N, 16° 40' W) in North East Greenland were...... evaluated for a two-year period from March 2008 to February 2010. Source apportionment using Positive Matrix Factorization (PMF) and COnstrained Physical REceptor Model (COPREM) was based on measurements of black carbon, elements (Al, Si, S, K, Ca, Ti, V, Cr, Mn, Fe, Ni, Cu, Zn, Ga, As, Se, Br, Rb, Sr, Zr...... origins. Another anthropogenic source was characterised by high concentrations of Pb and As, which has been historically referred to as a Combustion source at Station Nord. The impacts of large-scale industry in Siberia, Russia were evident through high Cu concentrations in both the Combustion source...

  12. Modeling and forecasting electricity price jumps in the Nord Pool power market

    DEFF Research Database (Denmark)

    Knapik, Oskar

    extreme prices and forecasting of the price jumps is crucial for risk management and market design. In this paper, we consider the problem of the impact of fundamental price drivers on forecasting of price jumps in NordPool intraday market. We develop categorical time series models which take into account......For risk management traders in the electricity market are mainly interested in the risk of negative (drops) or of positive (spikes) price jumps, i.e. the sellers face the risk of negative price jumps while the buyers face the risk of positive price jumps. Understanding the mechanism that drive...

  13. Répercussions de la chute du mur de Berlin sur des conflits nationalistes : Pays Basque et Irlande du Nord

    Directory of Open Access Journals (Sweden)

    Pascal Pragnère

    2012-11-01

    Full Text Available La chute du mur de Berlin et l’effondrement des régimes communistes eurent pour effet de discréditer et affaiblir de nombreux mouvements révolutionnaires, et de provoquer l’émergence ou la résurgence de mouvements nationalistes.En 1989-90, deux conflits violents faisaient rage au cœur de l’Europe occidentale démocratique, en Irlande du Nord et au Pays Basque.Dans ces deux territoires, des nationalistes, dont certains étaient des radicaux animés par des revendications nationalistes et révolutionnaires s’opposèrent à des états démocratiques par l’utilisation de la violence. Un processus de paix se développa à partir de 1998 en Irlande du Nord ; celui du Pays Basque est toujours dans l’impasse.Il semble au premier abord que ces conflits continuèrent sans bouleversement majeur dans la période qui suivit la chute du mur.Cet article examine les revendications des nationalistes en Irlande du Nord et au Pays Basque pour tenter de dévoiler dans quelle mesure ils furent affectés par ce choc historique.Une perspective comparative permet de comprendre que ces mouvements furent influencés différemment en fonction des contextes locaux. Certains acteurs politiques restèrent volontairement imperméables, alors que d’autres furent davantage affectés par le débat idéologique.

  14. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  15. Choosing a spent fuel interim storage system

    International Nuclear Information System (INIS)

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  16. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  17. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  18. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  19. NKS NordDSS - report from workshop on the use of Decision Support Systems

    Energy Technology Data Exchange (ETDEWEB)

    Dyve, J.E. (Norwegian Radiation Protection Authority (Norway))

    2010-03-15

    Nuclear preparedness and response authorities in the Nordic countries are using decision support systems (DSS) as part of their operational capability. A DSS compile, display and analyse data that makes up the current and future radiological state of an emergency. ARGOS and RODOS are the two most common systems in use in the Nordic region. The aim of of the NordDSS workshop was to gather Nordic and international experts on DSS, and share knowledge and experience. The workshop brought together 22 experts for two days in Copenhagen. (author)

  20. NKS NordDSS - report from workshop on the use of Decision Support Systems

    International Nuclear Information System (INIS)

    Dyve, J.E.

    2010-03-01

    Nuclear preparedness and response authorities in the Nordic countries are using decision support systems (DSS) as part of their operational capability. A DSS compile, display and analyse data that makes up the current and future radiological state of an emergency. ARGOS and RODOS are the two most common systems in use in the Nordic region. The aim of of the NordDSS workshop was to gather Nordic and international experts on DSS, and share knowledge and experience. The workshop brought together 22 experts for two days in Copenhagen. (author)

  1. A comparison of the value relevance of interim and annual financial statements

    Directory of Open Access Journals (Sweden)

    Mbalenhle Zulu

    2017-03-01

    Aim: It explores whether the value relevance of interim financial statements is higher than the value relevance of annual financial statements. Finally, it investigates whether accounting information published in interim and annual financial statements has incremental value relevance. Setting: Data for the period from 1999 to 2012 were collected from a sample of non-financial companies listed on the Johannesburg Stock Exchange. Method: The Ohlson model to investigate the value relevance of accounting information was used for the study. Results: The results show that interim book value of equity is value relevant while interim earnings are not. Interim financial statements appear to have higher value relevance than annual financial statements. The value relevance of interim and annual accounting information has remained fairly constant over the sample period. Incremental comparisons provide evidence that additional book value of equity and earnings that accrue to a company between interim and annual reporting dates are value relevant. Conclusion: The study was conducted over a long sample period (1999–2012, in an era when a technology-driven economy and more timely reporting media could have had an effect on the value relevance of published accounting information. To the best of our knowledge, this is the first study to evaluate and compare the value relevance of published interim and annual financial statements.

  2. Etude comparative de la rentabilité de deux types d'apiculture au nord ouest du Cameroun

    NARCIS (Netherlands)

    Tsafack Matsop, A.S.; Muluh Achu, G.; Kamajou, F.; Ingram, V.; Vabi Boboh, M.

    2011-01-01

    La présente étude examine la rentabilité financière de l’apiculture au Cameroun. Son objectif global est de comparer la rentabilité des deux types d’apiculture pratiqués au Nord Ouest Cameroun. L’hypothèse globale est qu’il existerait une différence significative en rendement de miel et en bénéfice

  3. FRAMES – oversvømmelseshåndtering i Nordsøregionen

    DEFF Research Database (Denmark)

    Thomsen, Mie; Andersen, Kaiija J.; Sørensen, Carlo Sass

    2017-01-01

    alternativer til den klassiske oversvømmelses-beskyttelse, der er både bekostelig og pladskrævende. Nogle alternativer, der fremkommer gennem konceptet Multi-Layer Safety (MLS) er forebyggelse, mitigation gennem fysisk planlægning og genopretning af ramte områder. Vi præsenterer EU Interreg North Sea Region......-projektet ’Flood Resilient Areas by Multi-layEred Safety’ (FRAMES), 2016-2019, der anvender dette koncept som udgangspunkt til at håndtere oversvømmelse og klimaændringer i nordsøregionen. Gennem FRAMES undersøger partnerne, hvordan lokalsamfund og kommuner arbejder med og håndterer en oversvømmelseshændelse før...

  4. Baisse de la transmission de la douve du foie dans le nord-est de la ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    mortelle de cancer du foie liée à l'O. viverrini. Dans cer- taines régions, près de 85 % de la population est porteuse du parasite. Les villages du nord-est de la Thaïlande, où l'on raffole du poisson cru, ont des taux d'infection parmi les plus élevés du pays. Les personnes infectées peuvent porter le parasite adulte pendant ...

  5. Nord stream: not just a pipeline. An analysis of the political debates in the Baltic Sea region regarding the planned gas pipeline from Russia to Germany

    Energy Technology Data Exchange (ETDEWEB)

    Whist, Bendik Solum

    2008-11-15

    This report is an analysis of the planned gas pipeline from Russia to Germany through the Baltic Sea known as Nord Stream. Although not yet realised, the project has, since its birth, been the subject of harsh criticism and opposition by a significant number of states that consider themselves affected by the pipeline. Whereas the Baltic States and Poland have interpreted the pipeline as a politically motivated strategy that will increase Russia's leverage on them and threaten their energy security, the debate in Sweden was at first mostly concerned with the prospect of increased Russian military presence in the Swedish Exclusive Economic Zone. The potential environmental impact of the pipeline has been, and continues to be, an overarching concern shared by all the littoral states of the Baltic Sea. Proponents of Nord Stream, most notably Germany, Russia and the Nord Stream consortium, have largely dismissed the concerns as unwarranted and argue that the pipeline is a common European project that all EU-members should embrace, as it will provide much-needed gas to an increasingly energy-thirsty union. This report is an extensive study of the divergent attitudes and debates that have surged in the region regarding Nord Stream, and the aim is to provide plausible explanations as to why the interpretations of the project have been so different in the various states. The report is based on a variety of sources, including several first-hand interviews with researchers and government officials in the Baltic Sea region. (author). refs.,fig.,tabs

  6. Nord stream: not just a pipeline. An analysis of the political debates in the Baltic Sea region regarding the planned gas pipeline from Russia to Germany

    Energy Technology Data Exchange (ETDEWEB)

    Whist, Bendik Solum

    2008-11-15

    This report is an analysis of the planned gas pipeline from Russia to Germany through the Baltic Sea known as Nord Stream. Although not yet realised, the project has, since its birth, been the subject of harsh criticism and opposition by a significant number of states that consider themselves affected by the pipeline. Whereas the Baltic States and Poland have interpreted the pipeline as a politically motivated strategy that will increase Russia's leverage on them and threaten their energy security, the debate in Sweden was at first mostly concerned with the prospect of increased Russian military presence in the Swedish Exclusive Economic Zone. The potential environmental impact of the pipeline has been, and continues to be, an overarching concern shared by all the littoral states of the Baltic Sea. Proponents of Nord Stream, most notably Germany, Russia and the Nord Stream consortium, have largely dismissed the concerns as unwarranted and argue that the pipeline is a common European project that all EU-members should embrace, as it will provide much-needed gas to an increasingly energy-thirsty union. This report is an extensive study of the divergent attitudes and debates that have surged in the region regarding Nord Stream, and the aim is to provide plausible explanations as to why the interpretations of the project have been so different in the various states. The report is based on a variety of sources, including several first-hand interviews with researchers and government officials in the Baltic Sea region. (author). refs.,fig.,tabs

  7. Nord-Cotentin radioecology group: an innovative experiment in pluralist expertise

    International Nuclear Information System (INIS)

    Lochard, J.; Schneider, T.; Crouail, P.; Heriard-Dubreuil, G.; Gadbois, S.; Oudiz, A.

    2000-11-01

    This report gives a synthetic overview of the procedure and the main results of the GRNC (Nord-Cotentin Radioecology Group), and lessons that can be drawn from it. In particular, it is intended to demonstrate the innovation of the pluralist approach adopted by summarizing its historic context and differences with the similar experiment carried out in the United Kingdom for the Sellafield nuclear site 1. It also presents the different steps in the evaluation of exposures and risks associated with ionising radiation. Finally, it emphasizes prospects opened as a result of the Group's experiment on the involvement of stakeholders in the evaluation and management of radiological risk. This final aspect could open up new means of ''preventively'' dealing with questions related to risks to health and the environment inherent to industrial activities. (A.L.B.)

  8. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  9. TWRS HLW interim storage facility search and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  10. Road map towards a common harmonised Nordic end-user market. NordREG report 5 - 2013

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-01

    The purpose of this road map is to describe the overall process to harmonise the Nordic electricity end-user markets. The main target groups for the road map are the Nordic governments, legislators and the electricity industry. The road map will continuously be updated as the project progresses, at least once a year. It describes the recommendations already made by NordREG, as well as indicates up-coming recommendations. One important part of the Nordic harmonisation process is the monitoring of the progress of the project. It will be communicated through national implementation monitoring overviews, which will describe the state of play for each recommendation made by NordREG. The road map highlights the importance of national commitment by different stakeholders, authorities and governments in order to successfully harmonise the Nordic end-user markets. This commitment is absolutely essential. The goal for 2015 is to harmonise some of the legislation, rules and processes that constitute barriers for suppliers to establish their business in other Nordic countries. In order to achieve this goal, NordREG is working towards defining responsibilities in the customer interface of the supplier centric model and the way of billing the customers. Another important task is related to development of an efficient way of communication among a large number of Nordic electricity companies. By 2015 the end-user markets should be harmonised to the extent that the most critical prerequisites have been achieved. But it is important to bear in mind that there are still many more steps to be taken also after 2015. The harmonisation process between the Nordic retail markets is a process that will continue for the foreseeable future. Since there is no supranational organisation or institution (like in the EU), it means that any future development of the Nordic retail market will have to be continuously coordinated between the Nordic countries to ensure that the markets maintain the

  11. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  12. Industrial complementarities between interim storage and reversible geological repository - 59237

    International Nuclear Information System (INIS)

    Hoorelbeke, Jean-Michel

    2012-01-01

    The French Act voted in 2006 made the choice of deep geological disposal as the reference option for the long term management of high level (HLW) and intermediate level long-lived waste. The CIGEO repository project aims at avoiding or limiting burden to future generations, which could not be achieved by the extension in time of interim storage. The reversibility as provided by the Act will maintain a liberty of choice for waste management on a duration which is comparable to new storage facility. Interim storage is required to accommodate waste as long as the repository is not available. The commissioning of the repository in 2025 will not suppress needs for interim storage. The paper describes the complementarities between existing and future interim storage facilities and the repository project: repository operational issues and planning, HLW thermal decay, support for the reversibility, etc. It shows opportunities to prepare a global optimization of waste management including the utilization at best of storage capacities and the planning of waste emplacement in the repository in such a way to facilitate operational conditions and to limit cost. Preliminary simulations of storage-disposal scenarios are presented. Thanks to an optimal use of the waste management system, provision can be made for a progressive increase of waste emplacement flow during the first operation phase of the repository. It is then possible to stabilize the industrial activity level of the repository site. An optimal utilization of interim storage can also limit the diversity of waste packages emplaced simultaneously, which facilitates the operation of the repository. 60 years minimum interim storage duration is generally required with respect to HLW thermal output. Extending this interim storage period may reduce the underground footprint of the repository. Regarding reversibility, the capability to manage waste packages potentially retrieved from the repository should be analyzed. The

  13. Contributo di dati di gravità nella valutazione del vulcanismo CAMP in Africa Nord-Occidentale

    OpenAIRE

    Fabbri, Julius

    2015-01-01

    2013/2014 La domanda alla base di questa ricerca è stata se il metodo della gravimetria satellitare possa essere utilizzato per seguire le unità geologiche anche in luoghi difficilmente accessibili. L’obiettivo di questa ricerca è di verificare se le missioni satellitari di nuova generazione permettano di identificare la più grande delle province ignee della Terra (Bertrand et al., 2013), nota come CAMP (Central Atlantic Magmatic Province) in Africa nord-occidentale. Oltre alle motivazioni...

  14. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  15. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  16. Use of alternative dispute resolution--HHS. Notice of interim policy.

    Science.gov (United States)

    1992-10-27

    The Department has developed an interim policy to address the use of alternative dispute resolution (ADR) as required by the Administrative Dispute Resolution Act (ADR Act), Public Law No. 101-552. This interim policy also responds to the Negotiated Rulemaking Act, Public Law No. 101-648, and relevant elements of the Executive Order on Civil Justice Reform (E.O. 12778). The Department is adopting an interim policy because we need a baseline of experience and knowledge from our own pilot activities and those of other agencies before finalizing a policy.

  17. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  18. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  19. Römerzeitliche keramik aus dem nordöstlichen Turm der Römerstadt Horreum Margi

    Directory of Open Access Journals (Sweden)

    Petković Sofija

    2011-01-01

    Full Text Available Ćuprija, die ehemalige Römerstadt Horreum Margi, liegt im zentralen Teil Serbiens, an der Mündung des Flusses Ravanica in die Morava. Der Ort war ein Militärlager und spielte eine wichtige Rolle als Sammlungszentrum der Römerprovinz Moesia Superior (Moesia Prima. Zwischen 1986 und 1990 fanden die Ausgrabungen von Horreum Margi statt. Dabei wurden der Innenraum der spätrömischen Festung, die nördliche Mauer und der nordöstliche Turm erforscht. Während der Ausgrabung im Turm wurden unterschiedliche Keramiktypen entdeckt. Schüsseln (acht Typen bilden dabei die Mehrheit. Danach kommen Töpfe (sieben Typen, Amphoren (zwei Typen, Krüge (zwei Typen, Deckel (ein Typ und Becher (ein Typ. Sie gehören alle zu einer komplexen spätrömerzeitlichen Typologie, die für diese Fundstelle erstellt wurde und entsprechen zu den restlichen Keramiktypen, die im Festungsinneren und entlang der Nordmauer ausgegraben kamen. Der Text bietet einen Überblick aller Keramiktypen an, die im nordöstlichen Turm der Römerfestung Horreum Margi entdeckt wurden. [Projekat Ministarstva nauke Republike Srbije, br. 177007: Romanisierung, Urbanisierung und Transformation städtischer Zentren vomzivilen, militärischen und Wohnungscharakter in den römischen Provinzen auf dem Territorium Serbiens i br. 177007: Viminacium dierömische Stadt und Militärlager-Forschung der materiellen und geistigen Hinterlassenschaft mit der Verwendung moderner Technologien: Ferndetektion, Geophysik, Gis Digitalisierung und 3.D Visualisierung

  20. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  1. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  2. Nord Pool wants to be the leader in CO2

    International Nuclear Information System (INIS)

    Wellander, Dag

    2004-01-01

    In the beginning of 2005 Nord Pool introduces standard contracts for European emission rights for carbon dioxide. It is currently too early to speak of a global market for emission rights for greenhouse gases. The problem is not the attitude of the U.S.A., as is often said, but what road is taken by the so-called third world. The acceptance of the Kyoto Protocol by the Russians means that the agreement will come into force in 2005. It is much more important, however, what is going to happen after the first implementation period 2008 - 2012. In that process those countries that strive for one car per household must also be engaged. In particular the giant nations China and India must join the agreement if it is to be a notable climatic agreement of global scope

  3. Final report from the NKS NordThreat seminar in Asker

    Energy Technology Data Exchange (ETDEWEB)

    Eikelmann, I M.H.; Selnaes, OE G [eds.; Norwegian Radiation Protection Authority (Norway)

    2009-11-15

    Changes in the international security environment have lead to an increased attention towards the need to revise various threat assessments in the Nordic countries. Together with recent events such as incidents at Nordic nuclear power plants, orphan sources and accidents involving nuclear powered vessels, this has given a good opportunity for an exchange of information and opinions. The NKS-B NordThreat seminar took place at Sem gjestegaard in Asker outside Oslo, Norway on 30 - 31 October 2008. Main topics in the seminar were: 1) National threat assessments 2) Potential hazards 3) Experience from previous incidents 4) Public perception of nuclear and radiological threats and information challenges 5) Challenges for future preparedness. There were about 40 participants at the seminar. These were mainly members of the NKS organisations, invited speakers and representatives from various Norwegian emergency preparedness organisations. (author)

  4. Polymorphisme de l'apolipoprotéine E dans la population du nord du Maroc: fréquence et influence sur les paramètres lipidiques

    Science.gov (United States)

    Benyahya, Fatiha; Barakat, Amina; Ghailani, Naima; Bennani, Mohcine

    2013-01-01

    Introduction L'objectif de ce travail est de déterminer les fréquences alléliques et génotypiques des sites polymorphes situés dans le gène de l'apolipoprotéine E (apo E) ainsi que leur impact sur les paramètres cliniques et lipidiques dans un échantillon de la population du nord du Maroc cliniquement diagnostiqué ADH. Méthodes Le génotype de l'apo E a été analysé par séquençage direct chez 46 patients cliniquement diagnostiqués ADH selon les critères standards. Résultats Les fréquences des allèles epsilon 3, epsilon 2 et epsilon 4 ont été respectivement 78.3%, 2.2% et 19.6%. La fréquence de l'allèle epsilon 4 est très élevée chez la population du nord du Maroc en comparaison avec les populations des autres régions marocaines. Elle est similaire à celle rapportée dans les pays de l'Europe du nord. Les taux du cholestérol total, du cholestérol LDL ainsi que la présence des xanthomes et les maladies cardiovasculaires ne différent pas entre les génotypes de l'apoE. En revanche, les résultats ont montré une influence de l'allèle epsilon4 sur le taux des triglycérides chez les sujets obèses. Conclusion Le génotype de l'apoE ne peut expliquer le phénotype clinique et biochimique présenté par des patients du Nord du Maroc cliniquement diagnostiqués ADH. PMID:24396563

  5. Materials behavior in interim storage of spent fuel

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  6. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  7. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  8. Spent fuel interim management: 1995 update

    International Nuclear Information System (INIS)

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  9. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  10. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  11. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  12. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  13. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  14. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  15. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  16. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  17. Lessons for outsourcing and interim management relationships.

    Science.gov (United States)

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  18. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  19. Taking energy efficiency to a new scale: the climate change action plan in Nord-Pas de Calais region

    International Nuclear Information System (INIS)

    Lafolie, Bertrand; Tillerson, Kenya

    2005-01-01

    Through the experience of a new climate change action plan in the French region 'Nord-Pas de Calais', the paper highlights the urgent necessity as well as the inherent difficulties for energy efficiency strategies to penetrate everyday practices and policies in order to reduce emissions in line with national and international commitments. Nord-Pas de Calais takes pride in two decades of sustained promotion of energy efficiency and renewable energy. Nevertheless, observation shows that regional consumption grows at roughly the same rate as does national consumption. The paper will present the history of energy efficiency in the region and relate the steps in elaborating a new climate change action plan that moves away from a focus on innovative projects towards the integration of easily replicable practices in business as usual. It then discusses some of the practical roadblocks that are faced in attempting to change the scale of achievements. Surprisingly, the main barrier met with until now seems not to be lack of interest and motivation towards energy efficiency from the general public but the way energy efficiency practitioners traditionally work and think eceee '005 Panel 2

  20. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  1. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  2. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  3. La faille Nord-Pyrénéenne dans l’Ariège et la Haute-Garonne

    NARCIS (Netherlands)

    Sitter, de L.U.

    1953-01-01

    Un des plus grands phénomènes structuraux des Pyrénées est sans doute la faille Nord-Pyrénéenne qui longe la zone axiale depuis la Méditerranée jusqu'à la côte atlantique. Elle est caractérisée par plusieurs particularités exceptionelles, dont le métamorphisme des terrains jurassiques et crétacés

  4. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  5. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  6. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  7. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  8. Final report from the NKS NordThreat seminar in Asker, Norway

    International Nuclear Information System (INIS)

    Eikelmann, I.M.H.; Selnaes, Oe.G.

    2009-11-01

    Changes in the international security environment have lead to an increased attention towards the need to revise various threat assessments in the Nordic countries. Together with recent events such as incidents at Nordic nuclear power plants, orphan sources and accidents involving nuclear powered vessels, this has given a good opportunity for an exchange of information and opinions. The NKS-B NordThreat seminar took place at Sem gjestegaerd in Asker outside Oslo, Norway on 30 - 31 October 2008. Main topics in the seminar were: 1) National threat assessments 2) Potential hazards 3) Experience from previous incidents 4) Public perception of nuclear and radiological threats and information challenges 5) Challenges for future preparedness. There were about 40 participants at the seminar. These were mainly members of the NKS organisations, invited speakers and representatives from various Norwegian emergency preparedness organisations. (author)

  9. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  10. Magnetic property analysis as palaeoenvironmental proxy: a case study of the Last Interglacial Middle Palaeolithic site at Neumark-Nord 2 (Germany)

    NARCIS (Netherlands)

    Sier, M.J.; Dekkers, M.J.

    2013-01-01

    The so-called Blake Event, an event of the geomagnetic fi eld, was identifi ed in the Middle Palaeolithic Neumark-Nord 2 (NN2) site in Germany by Sier et al. (2o11). These authors discussed the implications for the positioning of the Eemian in the Marine isotope stage (MIS) scale in

  11. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    Science.gov (United States)

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (Pmargin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (Pmarginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (Pmarginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns

  12. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  13. Interim FDG-PET Scan in Hodgkin's Lymphoma: Hopes and Caveats

    Directory of Open Access Journals (Sweden)

    M. André

    2011-01-01

    Full Text Available FDG-PET has recently emerged as an important tool for the management of Hodgkins lymphoma. Although its use for initial staging and response evaluation at the end of treatment is well established, the place of interim PET for response assessment and subsequent treatment tailoring is still quite controversial. The use of interim PET after a few cycles of chemotherapy may allow treatment reduction for good responders, leading to lesser treatment toxicities as well as early treatment adaptation for bad responders with a potential higher chance for cure. Interpretation of interim PET is a rapidly moving field. Actually, visual interpretation is preferred over quantitative interpretation in this situation. The notion of minimal residual uptake emerged for faint persisting FDG uptake, but has evolved during the recent years. Guidelines using mediastinum and liver as references have been proposed at the expert meeting in Deauville 2009. Actually, several trials are ongoing both for localised and advanced disease to evaluate the FDG-PET potential for early treatment monitoring and tailoring. Until the results of these prospective randomized trials become available, treatment changes according to the interim PET results should remain inappropriate and limited to well-conducted clinical trials.

  14. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  15. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  16. Early interim 18F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    International Nuclear Information System (INIS)

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele; Rigacci, Luigi; Puccini, Benedetta; Castagnoli, Antonio; Vaggelli, Luca; Zanoni, Lucia; Fanti, Stefano

    2012-01-01

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  17. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Science.gov (United States)

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  18. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    Science.gov (United States)

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  19. Nord Stream, the German-Russian oil pipeline under the Baltic Sea from the Swedish point of view

    International Nuclear Information System (INIS)

    Crone, Olivier

    2007-01-01

    Nord Stream is a 1.200 km long gas pipeline project between Russia and Germany through the Baltic Sea. It crosses the Swedish, Danish, and Finnish economic zones, and, at mid-way, comprises a control platform about which any traffic will be forbidden within a radius of 500 m. After having recalled some design aspects of this project, the author discusses whether it results in some energetic benefits for Sweden where the project has been a matter of debates on environmental and safety issues. It appears that Sweden is not interested at all in importing fossil energies, and that politicians are opposed to this project, but have no influence on it as the pipeline does not cross Swedish territorial waters. After having evoked the role of Gazprom as energetic weapon of the Russian foreign policy, the author discusses safety issues related to this pipeline and its control platform, and environmental risks as they are perceived by Sweden. Sweden indeed perceives the project infrastructure as being possibly used as a spying tool. As far as environmental issues are concerned, Nord Stream is to submit an environmental impact assessment to Denmark, Finland, Sweden, Germany and Russia. As a Swedish law could constrain and even impede the project, some alternate tracks are already envisaged and studied for the pipeline in order to minimise the environmental impact

  20. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  1. Interim and final storage casks

    International Nuclear Information System (INIS)

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  2. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  3. L’AMANT DE LA CHINE DU NORD, BY MARGUERITE DURAS: BOOK, FILM, NIGHT

    Directory of Open Access Journals (Sweden)

    Andréa Correa Paraiso Müller

    2016-06-01

    Full Text Available Na trajetória artística de Marguerite Duras, a relação entre cinema e literatura não se limita à passagem do texto à tela, mas compreende também o caminho inverso, da tela ao texto. Mais do que transformar filmes em livros, Duras fez literatura em diálogo com o cinema. No presente artigo, temos por objetivo analisar a maneira pela qual a linguagem cinematográfica perpassa a linguagem literária e vice-versa em L’Amant de la Chine du Nord (1991, texto que, embora chamado de romance por sua própria autora, organiza-se a partir de elementos próprios a um paratexto fílmico.

  4. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  5. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  6. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  7. Effectiveness of interim stage filter in the exhaust system of glove boxes

    International Nuclear Information System (INIS)

    Patre, D.K.; Vangara, H.; Thanamani, S.; Gopalakrishnan, R.K.; Mhatre, Amol M.

    2018-01-01

    All operations in radiochemical laboratories are carried out in containment systems like Glove boxes and Fume hoods. For controlling air contamination two separate air cleaning systems are incorporated. Laboratory has general ventilation system and glove boxes are provided with a negative pressure system (NPS). Glove box exhaust air is passed through three stage filtration systems: in situ, interim and final before discharging to the atmosphere. In addition to the individual HEPA filters of each glove box, there is an interim HEPA filter bank introduced at the laboratory end. This was introduced to reduce a load on main exhaust filter system. Finally the exhaust air is discharged through the final stage HEPA filter located in the filter house through the Stack. The interim HEPA filter bank provides additional protection for the release of particulate activity and reduces load on the final stage filters. In the present work efforts have been put to validate the interim stage filter, which has been introduced, to limit the environmental release

  8. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  9. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  10. A conservative method of retaining an interim obturator for a total maxillectomy patient

    Directory of Open Access Journals (Sweden)

    Nirmal Famila Bettie

    2017-01-01

    Full Text Available Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  11. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    Science.gov (United States)

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  12. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    DEFF Research Database (Denmark)

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...... in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score...

  13. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Science.gov (United States)

    2013-07-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0114] Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an interim Enforcement Policy that allows...

  14. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    Science.gov (United States)

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  15. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  16. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  17. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    International Nuclear Information System (INIS)

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  18. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  19. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Directory of Open Access Journals (Sweden)

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  20. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  1. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  2. Status of spent fuel storage facilities in Switzerland

    International Nuclear Information System (INIS)

    Beyeler, P.C.; Lutz, H.R.; Heesen, W. von

    1999-01-01

    Planning of a dry spent fuel storage facility in Switzerland started already 15 years ago. The first site considered for a central interim storage facility was the cavern of the decommissioned pilot nuclear plant at Lucens in the French-speaking part of Switzerland. This project was terminated in the late eighties because of lack of public acceptance. The necessary acceptance was found in the small town of Wuerenlingen which has hosted for many years the Swiss Reactor Research Centre. The new project consists of centralised interim storage facilities for all types of radioactive waste plus a hot cell and a conditioning and incinerating facility. It represents a so-called integrated storage solution. In 1990, the new company 'ZWILAG Zwischenlager Wuerenlingen AG' (ZWILAG) was founded and the licensing procedures according to the Swiss Atomic law were initiated. On August 26, 1996 ZWILAG got the permit for construction of the whole facility including the operating permit for the storage facilities. End of construction and commissioning are scheduled for autumn 1999. The nuclear power station Beznau started planning a low level waste and spent fuel storage facility on its own, because in 1990 its management thought that by 1997 the first high active waste from the reprocessing facilities in France would have to be taken back. This facility at the Beznau site, called ZWIBEZ, was licensed according to a shorter procedure so its construction was finished by 1997. The two facilities for high level waste and spent fuel provide space for a total of 278 casks, which is sufficient for the waste and spent fuel of the four Swiss nuclear power stations including their life extension programme. (author)

  3. 19 CFR 354.8 - Interim sanctions.

    Science.gov (United States)

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  4. Compilation of interim technical research memoranda. Volume I

    International Nuclear Information System (INIS)

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  5. LE FRANÇAIS DANS LA PRESSE ECRITE DU NORD-CAMEROUN : DIAGNOSTIC, CRITIQUES ET ORIENTATIONS

    Directory of Open Access Journals (Sweden)

    Moïse MBEY MAKANG

    2013-11-01

    Full Text Available La présente réflexion tire son origine de la crise linguistique observée au sein de la presse écrite du Nord-Cameroun. Celle-ci fait échos des irrégularités de la langue de Voltaire dans la presse écrite de cette partie du pays. De plus en plus, on y assiste à une émergence des déviances syntaxiques et une profusion des écarts langagiers à connotation dépréciative. L’indécence verbale de la société, la mauvaise prestation des élèves en classe et lors des examens officiels en sont des indicateurs pertinents. Il est important de mentionner que la cohabitation entre les langues camerounaises et le français, la sous-scolarisation et ou l’ignorance, le laxisme des rédacteurs en chef, etc. sont les mobiles profonds de cette incorrection. Pourtant, nous savons tous que les media sont une forteresse où la langue doit être préservée de toute entorse et représentent un modèle pour la société. Néanmoins, des traits caractéristiques du français de la presse écrite du Nord-Cameroun s’inscrivent en faux par rapport à cette vocation naturelle des media. Dès lors, la question que nous pouvons nous poser est celle de savoir si ces mobiles ci-dessus cités sont des éléments qui favorisent l’émergence de cette dialectalisation du français. En clair qu’est-ce qui caractérise le français des journalistes? Quelle est la structure morphosyntaxique du français des rédacteurs des journaux? S’agit-il d’un français conforme à une norme locale ou (y retrouvons-nous des énoncés exogènes ? Quel type de morphosyntaxe utilisent les rédacteurs ? Une morphosyntaxe endogène, morphosyntaxe qui leur est propre, ou plutôt une morphosyntaxe exogène, supposée unique à tous les francophones ? Peut-on parler d’alternance codique, d’argotisation, ou de créolisation ? La présente analyse a pour ambitions de s’interroger sur les mobiles profonds qui incitent des journalistes à s’écarter de la norme du fran

  6. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  7. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  8. NKS NordRisk II: Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    DEFF Research Database (Denmark)

    Smith Korsholm, Ulrik; Astrup, Poul; Lauritzen, Bent

    The present atlas has been developed within the NKS/NordRisk-II project "Nuclear risk from atmospheric dispersion in Northern Europe". The atlas describes risks from hypothetical long-range dispersion and deposition of radionuclides from 16 nuclear risk sites on the Northern Hemisphere...... spanning the climate variability associated with the North Atlantic Oscillation, and corresponding time evolution of the ensemble mean atmospheric dispersion....

  9. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  10. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  11. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    International Nuclear Information System (INIS)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  12. DATA MINING METHODOLOGY FOR DETERMINING THE OPTIMAL MODEL OF COST PREDICTION IN SHIP INTERIM PRODUCT ASSEMBLY

    Directory of Open Access Journals (Sweden)

    Damir Kolich

    2016-03-01

    Full Text Available In order to accurately predict costs of the thousands of interim products that are assembled in shipyards, it is necessary to use skilled engineers to develop detailed Gantt charts for each interim product separately which takes many hours. It is helpful to develop a prediction tool to estimate the cost of interim products accurately and quickly without the need for skilled engineers. This will drive down shipyard costs and improve competitiveness. Data mining is used extensively for developing prediction models in other industries. Since ships consist of thousands of interim products, it is logical to develop a data mining methodology for a shipyard or any other manufacturing industry where interim products are produced. The methodology involves analysis of existing interim products and data collection. Pre-processing and principal component analysis is done to make the data “user-friendly” for later prediction processing and the development of both accurate and robust models. The support vector machine is demonstrated as the better model when there are a lower number of tuples. However as the number of tuples is increased to over 10000, then the artificial neural network model is recommended.

  13. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  14. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  15. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  16. Used Fuel Logistics: Decades of Experience with transportation and Interim storage solutions

    Energy Technology Data Exchange (ETDEWEB)

    Orban, G.; Shelton, C.

    2015-07-01

    Used fuel inventories are growing worldwide. While some countries have opted for a closed cycle with recycling, numerous countries must expand their interim storage solutions as implementation of permanent repositories is taking more time than foreseen. In both cases transportation capabilities will have to be developed. AREVA TN has an unparalleled expertise with transportation of used fuel. For more than 50 years AREVA TN has safely shipped more than 7,000 used fuel transport casks. The transportation model that was initially developed in the 1970s has been adapted and enhanced over the years to meet more restrictive regulatory requirements and evolving customer needs, and to address public concerns. The numerous “lessons learned” have offered data and guidance that have allowed for also efficient and consistent improvement over the decades. AREVA TN has also an extensive experience with interim dry storage solutions in many countries on-site but also is working with partners to developed consolidated interim storage facility. Both expertise with storage and transportation contribute to safe, secure and smooth continuity of the operations. This paper will describe decades of experience with a very successful transportation program as well as interim storage solutions. (Author)

  17. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  18. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  19. Transitioning aluminum clad spent fuels from wet to interim dry storage

    International Nuclear Information System (INIS)

    Louthan, M.R. Jr.; Iyer, N.C.; Sindelar, R.L.; Peacock, H.B. Jr.

    1994-01-01

    The United States Department of Energy (DOE) currently owns several hundred metric tons of aluminum clad, spent nuclear fuel and target assemblies. The vast majority of these irradiated assemblies are currently stored in water basins that were designed and operated for short term fuel cooling prior to fuel reprocessing. Recent DOE decisions to severely limit the reprocessing option have significantly lengthened the time of storage, thus increasing the tendency for corrosion induced degradation of the fuel cladding and the underlying core material. The portent of continued corrosion, coupled with the age of existing wet storage facilities and the cost of continuing basin operations, including necessary upgrades to meet current facility standards, may force the DOE to transition these wet stored, aluminum clad spent fuels to interim dry storage. The facilities for interim dry storage have not been developed, partially because fuel storage requirements and specifications for acceptable fuel forms are lacking. In spite of the lack of both facilities and specifications, current plans are to dry store fuels for approximately 40 to 60 years or until firm decisions are developed for final fuel disposition. The transition of the aluminum clad fuels from wet to interim dry storage will require a sequence of drying and canning operations which will include selected fuel preparations such as vacuum drying and conditioning of the storage atmosphere. Laboratory experiments and review of the available literature have demonstrated that successful interim dry storage may also require the use of fuel and canister cleaning or rinsing techniques that preclude, or at least minimize, the potential for the accumulation of chloride and other potentially deleterious ions in the dry storage environment. This paper summarizes an evaluation of the impact of fuel transitioning techniques on the potential for corrosion induced degradation of fuel forms during interim dry storage

  20. Commercial development of a new process of uraniferous ore sintering by pelletizing before dump leaching (wet process) application to a very clayey ore of Nord-Aquitaine

    International Nuclear Information System (INIS)

    Videau, G.; Roche, M.

    1990-01-01

    Much of the French uranium ore contains clay of sedimentary origin or derived from the alteration of rocks of the granite type. During a dump leaching operation by a wet process, these clays reduce the percolation rates and sometimes the percolation rates are so low that the very essence of the dump leaching operation can be called in question. This problem arises particularly for the treatment of the ore of Nord-Aquitaine. The results of tests, carried out at the SEPA in Bessines, have shown that after pelletizing clayey ores with sodium silicate in the presence of sulphuric acid for the polymerization of the silicate, the percolation rates were much increased. This new method was successfully applied, from a laboratory column to a pilot dump of 500 tonnes for the very clayey ore of Nord-Aquitaine. This ore of low grade (approx. 1000 ppm of U) seems to be difficult to upgrade by any other method of treatment in the present economic context [fr

  1. Administrative Court Stade, decision of March 22, 1985 (interim storage facility at Gorleben)

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This decision deals with the planned interim storage facility of Gorleben (F.R.G.). The provisions introduced by the 4th ammendment to sec. 5 para. 6 and 9a to 9c of the German Atomic Energy Act might contain a definite regulation of the 'Entsorgung' of nuclear power stations. Sec. 6 of the Atomic Energy Act is not applicable to interim storage facilities because irradiated nuclear fuel has a double nature: It is spent fuel and nuclear waste as well. Considering current licensing procedures of construction and operation of nuclear installations in the field of 'Entsorgung', special legal regulations for the construction and operation of an interim storage facility have to be required. (CW)

  2. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  3. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    International Nuclear Information System (INIS)

    Burgard, K.C.

    1998-01-01

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis

  4. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  5. Agenda 21 interim balance, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Van Vuuren, D.P.; Bakkes, J.A.

    1997-10-01

    Five years after the `United Nations Conference on Environment and Development (UNCED)`, an interim balance was drawn up to see what was done to meet the ambitious challenges adopted in Agenda 21 during this conference. Such a balance is presented in this report and the complementary brochure, `Developments in Sustainability 1992-1997`, reflecting societal developments and changes in environmental quality, as well as changes in responses to environmental concerns. 24 figs., 12 tabs., 68 refs.

  6. Asie : Asie de l'Est : Japon : Région de Kanto : Préfecture de Tokyo : Tokyo : Habitations récentes dans la banlieue Nord

    OpenAIRE

    Lubeigt , Guy

    1983-01-01

    Commentaire de l'auteur en 2015: Tokyo a été presque entièrement détruite par les bombardements US en 1945 - Toutes les maisons en bois ont flambé; Légende manuscrite sur le document original : "Tokyo, banlieue N. Nouveau lotissement, toits en tuiles. " Géolocalisation : Approximative centrée sur le Nord de Tokyo.

  7. THE IMPORTANCE OF FINANCIAL INTERIM REPORTING FOR THE POSITION OF COMPANIES

    Directory of Open Access Journals (Sweden)

    Claudia‐Elena\tGRIGORAȘ‐ICHIM

    2015-12-01

    Full Text Available The importance that each company must grant to the strategic sources of information generates our concern for analysis of the interim financial reporting. In every enterprise, there are doubts on the usefulness of interim financial reports, given the following elements: the necessary time for their preparation (relatively long, their restricted character and the resources necessary to establish them. Finding a common solution to these problems and, implicitly, increasing the interest for interim financial reporting, can help to increase the economic performance of the company, either by reducing the unnecessary costs related to time, or by increasing communication and transparency with third parties. An appropriate management can act early in the direction of counteracting the negative effects in their company or prevention of any commercial or production failures, the overall economic trends in that field and increasing productivity. Starting from these premises, we propose a research in order to capture the main aspects related to the mentioned issues.

  8. Long-term interim storage concepts with conditioning strategies ensuring compatibility with subsequent disposal or reprocessing

    International Nuclear Information System (INIS)

    Moitrier, C.; Tirel, I.; Villard, C.

    2000-01-01

    The objective of the CEA studies carried out under research topic 3 (long-term interim storage) of the 1991 French radioactive waste management law is to demonstrate the industrial feasibility of a comprehensive, flexible interim storage facility by thoroughly evaluating and comparing all the basic components of various interim storage concepts. In this context, the CEA is considering reference solutions or concepts based on three primary components (the package, the interim storage facility and the site) suitable for determining the specifications of a very long-term solution. Some aspects are examined in greater detail, such as the implementation of long-term technologies, conditioning processes ensuring the absence of water and contamination in the facility, or allowance for radioactive decay of the packages. The results obtained are continually compiled in reports substantiating the design options. These studies should also lead to an overall economic assessment in terms of the capital and operating cost requirements, thereby providing an additional basis for selecting the design options. The comparison with existing industrial facilities highlights the technical and economic progress represented by the new generation of interim storage units. (authors)

  9. Application of dose evaluation of the MCNP code for interim spent fuel cask storage facility

    International Nuclear Information System (INIS)

    Kosako, Toshiso; Iimoto, Takeshi; Ishikawa, Satoshi; Tsuboi, Takafumi; Teramura, Masahiro; Okamura, Tomomi; Narumiya, Yoshiyuki

    2007-01-01

    The interim storage facility for spent fuel metallic cask is designed as a concrete building structure with air inlet and outlet for circulating the natural cooling. The feature of the interim storage facility is big capacity of spent fuel at several thousands MTU and restricted site usage. It is important to evaluate realistic dose rate in shielding design of the interim storage facility, therefore the three-dimensional continuous-energy Monte Carlo radiation transport code MCNP that exactly treating the complicated geometry was applied. The validation of dose evaluation for interim storage facility by MCNP code were performed by three kinds of neutron shielding benchmark experiments; cask shadow shielding experiment, duct streaming experiment and concrete deep penetration experiment. Dose rate distributions at each benchmark were measured and compared with the calculated results. The comparison showed a good consistency between calculation and experiment results. (author)

  10. Stranieri e vicini: le banche attraverso le frontiere del nord America. (Strangers and neighbours: cross-border banking in North America

    Directory of Open Access Journals (Sweden)

    J.W. DEAN

    2013-12-01

    Full Text Available L'articolo si occupa di aspetti normativi e competitivi della penetrazione reciproca da parte delle banche canadesi e statunitensi nei rispettivi mercati nazionali . Gli autori valutano il grado in cui i fattori economici sono gli unici responsabili per la differenza nei tassi di crescita tra le banche nazionali ed estere in Nord America. Essi sostengono che il regolamento non ha inciso sullala crescita delle banche estere in Nord America affrontando la questione della reciprocità in regolamenti bancari , prima di esaminare le banche estere negli Stati Uniti e il modo in cui sono state regolamentate .The paper is concerned with regulatory and competitive aspects of the mutual penetration by Canadian and U.S. banks of each other’s domestic markets. The authors assess the degree to which economic factors alone are responsible for the difference in growth rates between domestic and foreign banks in North America. They argue that regulation has not affected the growth of foreign banks in North America by addressing the question of reciprocity in banking regulations, before examining foreign banks in the U.S. and the manner in which they have been regulated. U.S. banks operating in Canada are then dealt with. Finally, the results of an empirical test of the proposition that the growth of cross-border banking is attributable to factors other than differential regulation is presented.JEL: G21

  11. Interim data report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Vahlund, Fredrik; Andersson, Johan

    2004-08-01

    This document is the interim data report in the project SR-Can. The purpose of the data report is to present input data, with uncertainty estimates, for the SR-Can assessment calculations. Besides input data, the report also describes the standardised procedures used when deriving the input data and the corresponding uncertainty estimates. However, in the present interim version of the report (written in the initial stage of the project when site characterisation has yet not been completed) the standardised procedures have not been possible to apply for most of the data and, in order to present a compilation of the data used in the assessment, much of the input data is presented without following the standardised procedures. This will however be changed for the final version of the SR-Can data report, in order to show the methodology that will be used in the final version one example of how input data will be presented is included (migration data for buffer) . The recommended input data for the assessment calculations are, for the interim version, mainly based on SR 97 Beberg data, these are merely presented without any background or uncertainty discussion (this is presented in the SR 97 data report)

  12. Interim Storage Facility decommissioning. Final report

    International Nuclear Information System (INIS)

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel

  13. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  14. 14 CFR 136.41 - Interim operating authority.

    Science.gov (United States)

    2010-01-01

    ... AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.41 Interim operating... terminate 180 days after the date on which an air tour management plan is established for the park and tribal lands; (6) Shall promote protection of national park resources, visitor experiences, and tribal...

  15. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 3. Alternatives for interim storage and transportation

    International Nuclear Information System (INIS)

    1976-05-01

    Volume III of the five-volume report contains information on alternatives for interim storage and transportation. Section titles are: interim storage of spent fuel elements; interim storage of chop-leach fuel bundle residues; tank storage of high-level liquid waste; interim storage of solid non-high-level wastes; interim storage of solidified high-level waste; and, transportation alternatives

  16. L’architecture médiévale en brique dans le nord de l’Europe

    OpenAIRE

    Debonne, Vincent

    2013-01-01

    Dans le nord de l’Europe, l’archéologie du bâti accorde un intérêt particulier à la brique, ce matériau de construction qui se répand très vite après sa « réinvention » aux alentours de 1200. Si les recherches sur l’histoire de la brique dans ces régions remontent au début du xxe siècle, on assiste depuis une vingtaine d’années à une nouvelle dynamique des études dans plusieurs pays. L’Allemagne donne le ton : non seulement s’y développe une variété d’approches de l’architecture médiévale en ...

  17. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  18. The relationship between spot and futures prices in the Nord Pool electricity market

    International Nuclear Information System (INIS)

    Botterud, Audun; Kristiansen, Tarjei; Ilic, Marija D.

    2010-01-01

    We analyze 11 years of historical spot- and futures prices from the hydro-dominated Nord Pool electricity market. We find that futures prices tend to be higher than spot prices. The average convenience yield is therefore negative, but varies by season and depends on the storage levels in hydro reservoirs. The average realized return on holding a long position in the futures market is also negative. The negative convenience yield and risk premium contrast empirical findings in most other commodity markets. We argue that differences between the supply and demand sides in terms of risk preferences and the ability to take advantage of short-term price variations can contribute to explain the observed relationship between spot- and futures prices. In addition, our analysis shows that the relationship between spot and futures prices is clearly linked to the physical state of the system, such as hydro inflow, reservoir levels, and demand. (author)

  19. Rosiglitazone evaluated for cardiovascular outcomes--an interim analysis

    DEFF Research Database (Denmark)

    Home, Philip D; Pocock, Stuart J; Beck-Nielsen, Henning

    2007-01-01

    BACKGROUND: A recent meta-analysis raised concern regarding an increased risk of myocardial infarction and death from cardiovascular causes associated with rosiglitazone treatment of type 2 diabetes. METHODS: We conducted an unplanned interim analysis of a randomized, multicenter, open...... group). The primary end point was hospitalization or death from cardiovascular causes. RESULTS: Because the mean follow-up was only 3.75 years, our interim analysis had limited statistical power to detect treatment differences. A total of 217 patients in the rosiglitazone group and 202 patients...... in the control group had the adjudicated primary end point (hazard ratio, 1.08; 95% confidence interval [CI], 0.89 to 1.31). After the inclusion of end points pending adjudication, the hazard ratio was 1.11 (95% CI, 0.93 to 1.32). There were no statistically significant differences between the rosiglitazone...

  20. Poor predictive value of positive interim FDG-PET/CT in primary mediastinal large B-cell lymphoma

    Energy Technology Data Exchange (ETDEWEB)

    Lazarovici, Julien; Petrovanu, Cynthia; Danu, Alina; Ferme, Christophe; Ribrag, Vincent; Ghez, David [Gustave Roussy, Villejuif (France). Dept. of Hematology; Paris Saclay Univ., Saint-Aubin (France); Terroir, Marie [Gustave Roussy, Villejuif (France). Dept. of Nuclear Medicine and Endocrine Oncology; Paris Saclay Univ., Saint-Aubin (France); Arfi-Rouche, Julia [Gustave Roussy, Villejuif (France). Dept. of Radiology; Paris Saclay Univ., Saint-Aubin (France); Michot, Jean-Marie [Gustave Roussy, Villejuif (France). Dept. of Drug Development (DITEP); Paris Saclay Univ., Saint-Aubin (France); Mussot, Sacha; Florea, Valentina [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Thoracic Surgery; Ghigna, Maria-Rosa [Marie Lannelongue Hospital, Le Plessis Robinson (France). Dept. of Pathology; Dartigues, Peggy [Gustave Roussy, Villejuif (France). Dept. of Pathology; Paris Saclay Univ., Saint-Aubin (France)

    2017-11-15

    Though commonly used to assess response to therapy, the prognostic value of interim FDG-PET/CT in Primary Mediastinal Large B-cell Lymphoma (PMBCL) is unclear. We conducted a retrospective study on 36 consecutive patients treated at our institution for a PMBCL between 2006 and 2014. All patients with a positive interim FDG-PET/CT had undergone histological restaging consisting either in a surgical debulking of the residual lesion (15 patients) or a CT-guided core needle biopsy (two patients). All FDG-PET/CT were secondarily reviewed according to the more recent Deauville criteria. Interim FDG-PET/CT was considered positive in 17/36 patients using visual evaluation. Among these patients, 14 had a Deauville score of 4. Histological restaging was negative in all but one case, showing inflammation and/or fibrosis. After a median follow-up of 48.5 months, a total of five patients have relapsed, two patients in the positive FDG-PET/CT group, and three patients in the negative FDG-PET/CT group, respectively. These data indicate that a positive interim FDG-PET/CT does not reflect persistence of active disease in the vast majority of PMBCL cases. The relapse rate appears similar regardless of interim FDG-PET/CT results and interpretation criteria. This suggests that interim FDG-PET/CT has a poor positive predictive value, thus kt should be used with caution in PMBCL. (orig.)

  1. Application of resistivity measurements to research on structural elements in the Nord-Limousin (France) uraniferous basin (1960); Application des mesures de resistivite a la recherche des elements structuraux dans le bassin uranifere du Nord-Limousin (France) (1960)

    Energy Technology Data Exchange (ETDEWEB)

    Sarcia, J A; Bonnet, J; Combe, R [Commissariat a l' Energie Atomique, Saclay (France).Centre d' Etudes Nucleaires

    1960-07-01

    The authors discuss the difficulties encountered in the exploration of a typical deposit in the Nord-Limousin, using the resistivity measurement method. In the zone in question the over-thrust was very variable and difficult to predict. The uraniferous deposits had two types of aspect, the passage from one to the other being often very sudden: long thin veins without gangue; short and thick lens-shape deposits which were strongly contaminated by clay towards their edges. After several unsatisfactory attempts, the device known as the 'rectangular map' was adopted and gave an acceptable structural representation rapidly and cheaply. For the placing of the probes however, methods are required which are more refined and sensitive. It is in any case useless to expect to obtain a satisfactory representation and a sufficient accuracy using a single technique; especially in the region under consideration. (author) [French] Les auteurs exposent les difficultes rencontrees pour l'exploration, par la methode des mesures de resistivite, d'un gisement type du Nord-Limousin: il s'agissait d'une zone a recouvrement tres variable et difficilement previsible. Les occurences uraniferes y affectaient deux facies passant brutalement de l'un a l'autre: longs filonnets minces et sans gangue; lentilles courtes et puissantes avec alteration argileuses tres etendue aux epontes. Apres plusieurs essais peu satisfaisants, le dispositif dit 'carte des rectangles' a ete adopte pour obtenir rapidement et a bon compte un schema structural suffisant. Mais des methodes plus fines et plus sensibles sont necessaires pour guider l'implantation des sondages. Il est d'ailleurs vain d'esperer trouver a la fois la representativite d'ensemble et la precision, dans l'utilisation d'une seule technique, surtout dans la region envisagee. (auteur)

  2. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Science.gov (United States)

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  3. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  4. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  5. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  6. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  7. Surface Water Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document for South Walnut Creek Basin (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1991-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This IM/IRA is to be conducted to minimize the release from these areas of hazardous substances that pose a potential threat to the public health and environment. The Plan involved the collection of contaminated surface water at specific locations, treatment by chemical precipitation, cross-flow membrane filtration and granular activated carbon (GAC) adsorption, and surface discharge of treated water. Information for the initial configuration of the Plan is presented in the document entitled ''Proposed Interim Measures/Interim Remedial Action Plan and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2'' (IM/IRAP) dated 26 September 1990. Information concerning the proposed Surface Water IM/IRA was presented during a public meeting held from 7 to 10 p.m., Tuesday, 23 October 1990, at the Westminster City Park Recreation Center in Westminster, Colorado. This Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to DOE during the public comment period which ended 24 November 1990. There were a number of technical comments on the plan that DOE has addressed herein. It is noted that several major issues were raised by the comments. Regardless of the estimated low risk to the public from construction and water transport activities, the popular sentiment of the public, based on comments received, is strong concern over worker and public health risks from these activities. In the light of public and municipal concerns, DOE proposes to eliminate from this IM/IRA the interbasin transfer of Woman Creek seepage to the South Walnut Creek drainage and to address collection and treatment of contaminated South Walnut Creek and Woman Creek surface water under two separate IM/IRAs

  8. Etude saisonnière de la contamination métallique des macroalgues de la lagune nord de Tunis

    OpenAIRE

    Chouba, L.; Ajjabi-Chebil, L.; Herry, S.

    2010-01-01

    Dans le but de démontrer la capacité de bioaccumulation métallique des macroalgues et sa variation temporelle, on s’est intéressé à la détermination de la gamme de concentrations en métaux traces (Plomb, Cadmium, Fer, Manganèse et Zinc) dans trois macroalgues vertes (Ulva rigida, Chaetomorpha linum, Caulerpa prolifera) au niveau de la lagune nord et du canal de navigation de Tunis sujettes à d’importants rejets anthropiques. Des collectes saisonnières ont été faites dans la lagune de Tunis du...

  9. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  10. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage

  11. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ..., Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY INFORMATION: Background To be... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of...

  12. Federal Administrative Court confirms interim action for the Kruemmel power plant site

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The interim action concerning the reactor site was confirmed in 1972, the action of voidance because of the possible injuriousness to health was rejected in the first instance. In the appeal OVG Lueneburg had sharpened three clauses concerning the contents of the restrictions and injunctions included in the interim action to the disadvantage of the operator. Responding to a new appeal the BVerwG has eliminated these restrictions and dismissed the following appeals of the plaintiffs. (HP) [de

  13. Quelques conséquences de l'introduction de deux espèces de macrophytes, Elodea canadensis Michaux et Elodea nuttallii St. John, dans les écosystèmes aquatiques continentaux : exemple de la plaine d'Alsace et des Vosges du Nord (Nord-Est de la France

    Directory of Open Access Journals (Sweden)

    THIEBAUT G.

    1997-01-01

    Full Text Available L'introduction au XIXème et XXème siècle, de deux espèces d'élodées Elodea canadensis Michaux et Elodea nuttallii St. John, dans les cours d'eau du nord-est de la France, a induit des modifications dans la composition floristique et le fonctionnement des écosystèmes aquatiques. L'analyse comparative de la distribution géographique de ces deux hydrophytes dans les eaux calcaires (plaine d'Alsace et acides (Vosges du Nord a permis de préciser leur écologie. Après des phases successives d'expansion des deux espèces, celles-ci se sont intégrées dans les phytocénoses aquatiques. L'introduction dans les écosystèmes aquatiques d'Elodea canadensis et d'E. nuttallii a induit des phénomènes de compétition interspécifique, en faveur essentiellement d'Elodea nuttallii. Cette dernière apparaît comme l'espèce la plus compétitive dans les cours d'eau eutrophes de la plaine d'Alsace (aptitude à accumuler le phosphore, sensibilité moindre à l'azote ammoniacal. Les élodées peuvent réaliser une épuration biologique, mais provoquent, lors de leur décomposition, une eutrophisation secondaire des eaux en absence de faucardage.

  14. 77 FR 34935 - Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind...

    Science.gov (United States)

    2012-06-12

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket T-4-2012] Foreign-Trade Zone 161; Temporary/Interim Manufacturing Authority; Siemens Energy, Inc., (Wind Turbine Nacelles and Hubs); Notice of... temporary/interim manufacturing (T/IM) authority, on behalf of Siemens Energy, Inc., to manufacture wind...

  15. Using ERA-Interim reanalysis for creating datasets of energy-relevant climate variables

    Science.gov (United States)

    Jones, Philip D.; Harpham, Colin; Troccoli, Alberto; Gschwind, Benoit; Ranchin, Thierry; Wald, Lucien; Goodess, Clare M.; Dorling, Stephen

    2017-07-01

    The construction of a bias-adjusted dataset of climate variables at the near surface using ERA-Interim reanalysis is presented. A number of different, variable-dependent, bias-adjustment approaches have been proposed. Here we modify the parameters of different distributions (depending on the variable), adjusting ERA-Interim based on gridded station or direct station observations. The variables are air temperature, dewpoint temperature, precipitation (daily only), solar radiation, wind speed, and relative humidity. These are available on either 3 or 6 h timescales over the period 1979-2016. The resulting bias-adjusted dataset is available through the Climate Data Store (CDS) of the Copernicus Climate Change Data Store (C3S) and can be accessed at present from climate.copernicus.eu" target="_blank">ftp://ecem.climate.copernicus.eu. The benefit of performing bias adjustment is demonstrated by comparing initial and bias-adjusted ERA-Interim data against gridded observational fields.

  16. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    Science.gov (United States)

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  17. 39 CFR 211.4 - Interim personnel regulations.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim personnel regulations. 211.4 Section 211.4... under the Postal Reorganization Act. (b) Continuation of Personnel Provisions of Former title 39, U.S.C... collective bargaining agreement under the Postal Reorganization Act, all provisions of former title 39, U.S.C...

  18. Nord Stream 2: May Cooler Heads Prevail

    International Nuclear Information System (INIS)

    Aoun, Marie-Claire

    2016-01-01

    Since the announcement of the Nord Stream 2 project in June 2015, the debate around the benefits of this project for Europe is raging, putting forward political, economic and commercial arguments. Within the space of a few months, Russia has conducted a radical strategic change towards Europe in its gas policy. Following the announcements in 2014 of a major shift towards Asia, the cancellation of the South Stream project and its replacement by the Turkish Stream, relations with European gas companies have been strengthened since mid-2015. Russia's initiatives to replace its European partners are now to be viewed as part of a transformed international gas landscape. Tensions in the liquefied natural gas (LNG) market following Fukushima have given way to market surpluses. These are characterised on the one hand by lower growth in Asian demand for LNG gas, and on the other hand by the arrival on the market of new major exporters such as Australia and the United States. A new era, more favourable to gas importing countries, has opened up since the end of 2014. Moreover, the key pivot to Asia, expected by Moscow in 2014, is still far off. Discussions with Beijing about the project for a Western route proved to be more difficult than expected. Similarly, negotiations between Turkey and Russia on the Turkish Stream project have been very laborious, having been interrupted for several months because of diplomatic rows between the two countries. Finally, Russia's room for manoeuvre has narrowed, given the collapse in oil and gas prices and Western economic sanctions, which are weighing heavily on its economy. And the increased competitiveness of Russian oil companies due to the ruble devaluation will not transform this situation sustainably

  19. Dry interim storage of radioactive material in Germany

    International Nuclear Information System (INIS)

    Drobniewski, Christian; Palmes, Julia

    2013-01-01

    In accordance with the waste management concept in Germany, spent fuel is stored in interim storage facilities for a period of up to 40 years until deposition in a geological repository. In twelve on-site interim storages in the vicinity or directly on the sites of the nuclear power plants, spent fuel elements from reactor operation are stored after the necessary period of decay in wet storage basins inside the reactors. Additionally, three central interim storage facilities for storage of spent fuel of different origin are in operation. The German facilities realize the concept of dry interim storage in metallic transport and storage casks. The confinement of the radioactive material is ensured by the double lid system of the casks, of which the leak tightness is monitored constantly. The casks are constructed to provide adequate heat removal and shielding of gamma and neutron radiation. Usually the storage facilities are halls of thick concrete structures, which ensure the removal of the decay heat by natural convection. The main safety goal of the storage concept is to prevent unnecessary exposure of persons, material goods and environment to ionizing radiation. Moreover any exposure should be kept as low as reasonable achievable. To reach this goal the containment of the radioactive materials, the disposal of decay heat, the sub criticality and the shielding of ionizing radiation has to be demonstrated by the applicant and verified by the licensing authority. In particular accidents, incidents and disasters have to be considered in the facility and cask design. This includes mechanical impacts onto the cask, internal and external fire, and environmental effects like wind, rain, snowfall, flood, earthquakes and landslides. In addition civilizatoric influences like plane crashes and explosions have to be taken into account. In all mentioned cases the secure confinement of the radioactive materials has to be ensured. On-site storage facilities have to consider the

  20. Guidelines for interim storage of low level waste

    International Nuclear Information System (INIS)

    Hornibrook, C.; Castagnacci, A.; Clymer, G.; Kelly, J.; Naughton, M.; Saunders, P.; Stoner, P.; Walker, N.; Cazzolli, R.; Dettenmeier, R.; Loucks, L.; Rigsby, M.; Spall, M.; Strum, M.

    1992-12-01

    This report presents an overview of on-site storage of Low Level Waste while providing guidelines for using the complete Interim On-Site Storage of Low Level Waste report series. Overall, this report provides a methodology for planning and implementing on-site storage

  1. The Nordic power exchange Nord pool and the Nordic model for a liberalised power market

    International Nuclear Information System (INIS)

    Houmoller, A. P.

    2000-01-01

    As the first countries in the world, the Nordic countries Norway, Sweden, Finland and denmark have established a common, multinational power exchange. By means of this common power exchange, these countries also have established a common power market. this is also the first - and for the time being - the only place in the world, where you can find a multinational, truly competitive power market. This Nordic model has attracted much interest from other countries in Europe, Asia, North America and South America. The presentation will explain, how the common power exchange makes it possible for the four countries and the five system operators in Scandinavia physically and financially to operate a common, multinational, competitive power market. The presentation will explain how this systems works in the Nordic countries by discussion the following items: - The non-commercial players: The Transmission System Operators and the local grid operators; - The market players: the producers, the retailers, the traders, the brokers and the end users; - The access to the grid: The point tariff system; - The fairness towards the market players and the security of supply: The balancing power and the regulating power; - The power exchange handles bottlenecks in the grid. The presentation will explain how this is done and will demonstrate how this gives the power market a bottleneck handing method which:- Is neutral and fair towards all the market players, - Ensures that all the capacity of any bottleneck is utilised during every hour of operation, - Is extremely easy to use for the Transmission System Operators - also if the bottleneck is cross-border bottleneck; - The Nord Pool spot market Elspot; - The Nord Pool futures market Eltermin; - Area prices; - How financial contracts replace physical contracts when the power market is liberalised; - The day-to-day market and the market for long-term contracts in a liberalised power market; - How to eliminate the c ounter party risk

  2. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  3. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  4. Interim Feed The Future Population Based Assessment of Cambodia

    Data.gov (United States)

    US Agency for International Development — This is the interim population based survey of Feed the Future in Cambodia for 2015. The data is split into survey modules. Modules A through C includes location...

  5. Fuel supply shutdown facility interim operational safety requirements

    International Nuclear Information System (INIS)

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance)

  6. An allowable cladding peak temperature for spent nuclear fuels in interim dry storage

    Science.gov (United States)

    Cha, Hyun-Jin; Jang, Ki-Nam; Kim, Kyu-Tae

    2018-01-01

    Allowable cladding peak temperatures for spent fuel cladding integrity in interim dry storage were investigated, considering hydride reorientation and mechanical property degradation behaviors of unirradiated and neutron irradiated Zr-Nb cladding tubes. Cladding tube specimens were heated up to various temperatures and then cooled down under tensile hoop stresses. Cool-down specimens indicate that higher heat-up temperature and larger tensile hoop stress generated larger radial hydride precipitation and smaller tensile strength and plastic hoop strain. Unirradiated specimens generated relatively larger radial hydride precipitation and plastic strain than did neutron irradiated specimens. Assuming a minimum plastic strain requirement of 5% for cladding integrity maintenance in interim dry storage, it is proposed that a cladding peak temperature during the interim dry storage is to keep below 250 °C if cladding tubes are cooled down to room temperature.

  7. Mental health and wellbeing in spouses of persons with dementia: the Nord-Trøndelag Health Study.

    Science.gov (United States)

    Ask, Helga; Langballe, Ellen Melbye; Holmen, Jostein; Selbæk, Geir; Saltvedt, Ingvild; Tambs, Kristian

    2014-05-01

    Caring for a spouse diagnosed with dementia can be a stressful situation and can put the caregiving partner at risk of loss of mental health and wellbeing. The main aim of this study was to investigate the relationship between dementia and spousal mental health in a population-based sample of married couples older than 55 years of age. The association was investigated for individuals living together with their demented partner, as well as for individuals whose demented partner was living in an institution. Data on dementia were collected from hospitals and nursing homes in the county of Nord-Trøndelag, Norway. These data were combined with data on spousal mental health, which were collected in a population-based health screening: the Nord-Trøndelag Health Study (HUNT). Of 6,951 participating couples (>55 years), 131 included one partner that had been diagnosed with dementia. Our results indicate that after adjustment for covariates, having a partner with dementia is associated with lower levels of life satisfaction and more symptoms of anxiety and depression than reported by spouses of elderly individuals without dementia. Spouses living together with a partner diagnosed with dementia experienced moderately lower levels of life satisfaction (0.35 standard deviation [SD]) and more symptoms of depression (0.38 SD) and anxiety (0.23 SD) than did their non-caregiving counterparts. Having a partner with dementia that resided in a nursing home was associated with clearly lower life satisfaction. Compared with non-caregivers, these spouses reported lower levels of life satisfaction (1.16 SD), and also more symptoms of depression (0.38 SD), and more symptoms of anxiety (0.42 SD). Having a partner with dementia is associated with loss of mental health and reduced life satisfaction. The risk of adverse mental health outcomes is greatest after the partner's nursing home admission.

  8. 17 CFR 210.8-03 - Interim financial statements.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Interim financial statements... AND CONTENT OF AND REQUIREMENTS FOR FINANCIAL STATEMENTS, SECURITIES ACT OF 1933, SECURITIES EXCHANGE... ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Article 8 Financial Statements of...

  9. Options for the interim storage of spent fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  10. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  11. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  12. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    Science.gov (United States)

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  13. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  14. Effectiveness of interim remedial actions at the Niagara Falls Storage Site

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Seay, W.M.; McNamee, E.

    1990-01-01

    There are 190,000 m 3 of contaminated soils, wastes, and residues stored at the Niagara Falls Storage Site (NFSS). The residues have a volume of 18,000 m 3 and contain about 1,930 Ci of 226 Ra, which accounts for most of the radioactivity. Since 1980, actions have been taken to minimize potential radiological risks and prevent radionuclide migration. Interim actions included capping vents, sealing pipes, relocating the perimeter fence (to limit radon risk), transferring and consolidating wastes, upgrading storage buildings, constructing a clay cutoff wall (to limit potential ground-water transport of contaminants), treating and releasing contaminated water, using a synthetic liner, and using an interim clay cap. An interim waste containment facility was completed in 1986. Environmental monitoring showed a decrease in radon concentrations and in external gamma radiation from 1982 to 1986; levels have been stable since 1986. Uranium and radium concentrations in surface water have decreased; very low concentrations have been detected in stream sediments, and concentrations in ground water have remained stable. Recent monitoring showed that NFSS is in compliance with the U.S. Department of Energy's (DOE's) radiation protection standards

  15. German Approach for the Transport of Spent Fuel Packages after Interim Storage

    International Nuclear Information System (INIS)

    Wille, Frank; Wolff, Dietmar; Droste, Bernhard; Voelzke, Holger

    2014-01-01

    In Germany the concept of dry interim storage of spent nuclear fuel in dual purpose metal casks is implemented, currently for periods of up to 40 years. The casks being used have an approved package design in accordance with the international transport regulations. The license for dry storage is granted on the German Atomic Energy Act with respect to the recently (in 2012) revised 'Guidelines for dry cask storage of spent nuclear fuel and heat-generating waste' by the German Waste management Commission (ESK) which are very similar to the former RSK (reactor safety commission) guidelines. For transport on public routes between or after long term interim storage periods, it has to be ensured that the transport and storage casks fulfil the specifications of the transport approval or other sufficient properties which satisfy the proofs for the compliance of the safety objectives at that time. In recent years the validation period of transport approval certificates for manufactured, loaded and stored packages were discussed among authorities and applicants. A case dependent system of 3, 5 and 10 years was established. There are consequences for the safety cases in the Package Design Safety Report including evaluation of long term behavior of components and specific operating procedures of the package. Present research and knowledge concerning the long term behavior of transport and storage cask components have to be consulted as well as experiences from interim cask storage operations. Challenges in the safety assessment are e.g. the behavior of aged metal and elastomeric seals under IAEA test conditions to ensure that the results of drop tests can be transferred to the compliance of the safety objectives at the time of transport after the interim storage period (aged package). Assessment methods for the material compatibility, the behavior of fuel assemblies and the aging behavior of shielding parts are issues as well. This paper describes the state

  16. Marine environment protection of the North Sea and Baltic Sea. Special report - February 2004; Meeresumweltschutz fuer Nord- und Ostsee. Sondergutachten - Februar 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The marine environment of the North Sea and Baltic Sea is still heavily polluted. The marine ecosystems are under severe stress from overfishing, water pollution, raw materials production and tourism. Environmental protection in this region necessitates decisive political initiatives and strict corrections especially in fishery policy, agricultural policy and chemical substances control. This is the balance of the special expert opinion of the Council of Environmental Experts. The publication specifies the main problem areas, the current pollution situation, the fields where action is most urgently required - especially in fishery, chemical substances, agricultural and sea travel policies - and presents suggestions for an integrated European and national marine protection policy including a regional development concept for the marine environment. (orig.) [German] Die Meeresumwelt von Nord- und Ostsee ist nach wie vor stark belastet. Ueberfischung, Schadstoffeintraege und Ueberduengung sowie die intensive Nutzung durch Schifffahrt, Rohstoffabbau und Tourismus beeintraechtigen vielfach massiv die marinen Oekosysteme. Ein wirksamer Meeresumweltschutz erfordert daher einschneidende politische Initiativen und grundlegende Korrekturen insbesondere in der Fischereipolitik, der Agrarpolitik und bei der Chemikalienregulierung. Diese Bilanz zieht der Rat von Sachverstaendigen fuer Umweltfragen in seinem aktuellen Sondergutachten 'Meeresumweltschutz fuer Nord- und Ostsee'. Das Sondergutachen - gibt einen Ueberblick ueber die wichtigsten Problemfelder und die aktuelle Belastungslage, - zeigt den wesentlichen Handlungsbedarf auf, insbesondere fuer die Fischerei-, Chemikalien-, Agrar- und Schifffahrtspolitik und - entwickelt Vorschlaege fuer eine integrierte europaeische und nationale Meeresschutzpolitik einschliesslich einer Merresraumordnung. (orig.)

  17. 1987 Federal interim storage fee study: A technical and economic analysis

    International Nuclear Information System (INIS)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs

  18. 1987 Federal interim storage fee study: A technical and economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  19. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  20. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  1. Interim report on long range plan for nuclear physics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The interim report on the updated NSAC Long Range Plan for Nuclear Physics will be presented to the community for discussion and comment before submission to the funding agencies. The presentation will be coordinated by E. Moniz chair of NSAC

  2. Памятник преградил путь Nord Stream / Туули Кох

    Index Scriptorium Estoniae

    Кох, Туули

    2010-01-01

    Vene- Saksa gaasijuhtme ehituse sõlmpunktiks muutuval Gotlandil jäi Slite sadamasse Nord Streami raha eest ehitatud kaile ette mälestusmärk eestlastele ja lätlastele, kes 1944. aastal punavõimu eest põgenedes Gotlandile jõudsid. Kaart

  3. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  4. Tank Farm Interim Surface Barrier Materials And Runoff Alternatives Study

    International Nuclear Information System (INIS)

    Holm, M.J.

    2009-01-01

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  5. Финны могут поддержить Nord Stream / Мадис Филиппов

    Index Scriptorium Estoniae

    Филиппов, Мадис

    2009-01-01

    Soome ja Eesti keskkonnaministeeriumi ning teadlaste kohtumisel arutati gaasijuhtmega Nord Stream kaasnevaid probleemseid keskkonnaküsimusi: Eesti teadlased on endiselt seisukohal, et gaasijuhtmel on Eesti keskkonnale väga negatiivne mõju

  6. Development of Accident Scenario for Interim Spent Fuel Storage Facility Based on Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dongjin; Choi, Kwangsoon; Yoon, Hyungjoon; Park, Jungsu [KEPCO-E and C, Yongin (Korea, Republic of)

    2014-05-15

    700 MTU of spent nuclear fuel is discharged from nuclear fleet every year and spent fuel storage is currently 70.9% full. The on-site wet type spent fuel storage pool of each NPP(nuclear power plants) in Korea will shortly exceed its storage limit. Backdrop, the Korean government has rolled out a plan to construct an interim spent fuel storage facility by 2024. However, the type of interim spent fuel storage facility has not been decided yet in detail. The Fukushima accident has resulted in more stringent requirements for nuclear facilities in case of beyond design basis accidents. Therefore, there has been growing demand for developing scenario on interim storage facility to prepare for beyond design basis accidents and conducting dose assessment based on the scenario to verify the safety of each type of storage.

  7. Ad interim legal remedy in case of large projects

    International Nuclear Information System (INIS)

    Limberger, J.

    1985-01-01

    Action for ad interim judicial relief in response to large projects approved of by the authorities very frequently take several years until a decision is taken by the court. Experience has shown that this applies in particular to large projects such as the construction of nuclear power plants, large-size industrial plants, or airports. It has become regular practice by the authorities concerned to issue an order for immediate execution upon the plan approving decision and granting of licence for said projects, in accordance with section 80, sub-section (2), no.4 of the VwGO. The problems thus created with regard to interim legal remedy sought by the parties concerned are of great significance. The book in hand discusses the question as to whether the practice of the administrative authorities and the courts satisfies the requirements embodied in the law, to provide for efficient legal protection. (orig./HSCH) [de

  8. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Science.gov (United States)

    2010-10-01

    ... of such devices, shall be permitted in the passenger compartment. When the bus is at rest at a stop... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities...

  9. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    International Nuclear Information System (INIS)

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  10. Recenser et étudier le patrimoine religieux du XXe siècle : l’exemple de l’inventaire des églises du Nord-Pas-de-Calais (1945-2000

    Directory of Open Access Journals (Sweden)

    Céline Frémaux

    2009-11-01

    Full Text Available La seconde moitié du XXe siècle fut une période de mutation accélérée de l’architecture religieuse en France. L’inventaire des églises paroissiales reconstruites et construites dans la région Nord-Pas-de-Calais entre 1945 et 2000 en reflète les divers aspects. Le corpus de 183 églises servant de base à une thèse de doctorat révèle l’effort d’adaptation de l’Église aux mutations historiques, économiques et sociales de cette périodeThe second half of the 20th century was a time of tumultuous changes in French religious architecture. The survey of parish churches built in the Nord-Pas-de-Calais region between 1945 and 2000 reflects all these changes. The corpus of 183 churches, on which a thesis has been based, reveals the church’s ability as an institution to adapt to the historical, economic and social changes of its time.

  11. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Science.gov (United States)

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  12. Individual shareholders’ understanding of the content of interim reports of South African listed retail companies

    Directory of Open Access Journals (Sweden)

    Johan GI Oberholster

    2015-05-01

    Full Text Available A number of studies conducted, and reports published, by international and local accounting bodies have found that the proliferation of disclosures in financial reports has hampered users’ understanding of these reports. The reports by accounting bodies also indicate that these users prefer more concise financial reports. These findings, in conjunction with a dearth of recent questionnaire-based research on whether individual shareholders understand the content of financial reports, resulted in this study on whether individual shareholders understand the content of interim reports. The study provides empirical proof that a sound knowledge of business, accounting and economic matters is a prerequisite for understanding interim reports in the case of individual shareholders. The results of the study indicate that individual shareholders have a limited understanding of the content of interim reports as a whole, and that a good knowledge of business and economic matters and of accounting results in an improved understanding of the content of interim reports. In particular, specialisation in accounting in undergraduate and postgraduate degrees, professional qualifications, and work experience in the financial field improve the understanding of individual shareholders.

  13. Proceedings of The 13. Nordic Workshop on Secure IT Systems, NordSec 2008, Kongens Lyngby Oct 9-10, 2008

    DEFF Research Database (Denmark)

    in Security and Mobile Computing “NordSecMob”, and a meeting of the FIRST research school. We received a total of 39 submissions in response to the call for papers, and the programme committee selected 17 of these for presentation at the workshop—one short paper, which is not included in the proceedings......, and 16 research papers. It was a pleasure for us to work with the program committee, and we want to thank both them and the additional reviewers. Beside the submitted contributions we invited Audun Jøsang, University of Oslo, and Michael Huth, Imperial College London, to speak at the workshop. Abstracts...

  14. Эстонские ученые против строительства Nord Stream

    Index Scriptorium Estoniae

    2009-01-01

    Eesti Teaduste Akadeemia kirjast president Toomas Hendrik Ilvesele ja peaminister Andrus Ansipile sooviga moodustada professionaalne komisjon, mis töötaks läbi Nord Streami gaasijuhtme keskkonnamõju hindamise materjalid

  15. Strategic Review of Medical Training and Career Structure Interim Report

    OpenAIRE

    Department of Health (Ireland)

    2013-01-01

    Click here to download Strategic Review of Medical Training and Career Structure Interim Report PDF 44kb Click here to download Strategic Review of Medical Training and Career Structure Terms of Reference PDF 59KB

  16. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  17. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  18. Report on the long-term interim storage of spent fuels and vitrified wastes; Gutachten zur Langzeitzwischenlagerung abgebrannter Brennelemente und verglaster Abfaelle

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-03

    Long-term interim storage for several hundred years is an option on the management of high-level radioactive wastes. The decision on final disposal is postponed. Worldwide the long-term interim storage is not part of the disposal concept - a geologic final repository is the ultimate aim. Using today's technology the interim storage over several hundred years is supposed to be uncritical. Aging management is the most important challenge - the renewal of the facilities would have to be expected. Possible social change and their impact on the interim storage problem has not been considered.

  19. Common long-range dependence in a panel of hourly Nord Pool electricity prices and loads

    DEFF Research Database (Denmark)

    Ergemen, Yunus Emre; Haldrup, Niels; Rodríguez-Caballero, Carlos Vladimir

    to strong seasonal periodicity, and along the cross-sectional dimension, i.e. the hours of the day, there is a strong dependence which necessarily has to be accounted for in order to avoid spurious inference when focusing on the time series dependence alone. The long-range dependence is modelled in terms...... of a fractionally integrated panel data model and it is shown that both prices and loads consist of common factors with long memory and with loadings that vary considerably during the day. Due to the competitiveness of the Nordic power market the aggregate supply curve approximates well the marginal costs...... data approaches to analyse the time series and the cross-sectional dependence of hourly Nord Pool electricity spot prices and loads for the period 2000-2013. Hourly electricity prices and loads data are characterized by strong serial long-range dependence in the time series dimension in addition...

  20. 46 CFR 308.303 - Amounts insured under interim binder.

    Science.gov (United States)

    2010-10-01

    ... 308.303 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by shipping...

  1. O modelo Funcionalista de Christiane Nord aliado ao dispositivo de Sequências Didáticas: norteamentos para o Ensino de Tradução

    Directory of Open Access Journals (Sweden)

    Valdecy Oliveira Pontes

    2017-08-01

    Full Text Available Abordagens mais recentes nos Estudos da Tradução partem do princípio de que não se traduz uma língua/cultura, mas textos. Na perspectiva da Tradução Funcionalista, esses não podem ser compreendidos à parte de seu contexto comunicativo, fato que justifica a proximidade do Ensino de Tradução com o conhecimento sobre gêneros textuais, destacada, inclusive, por Nord (2012. Assim, a partir da perspectiva teórica funcionalista de Christiane Nord (1991, 1994, 1996, 2012 para o ensino de tradução e da contribuição da Linguística de Texto acerca do funcionamento e domínio dos gêneros textuais, este trabalho discorre sobre a aplicação de Sequências Didáticas (SD na formação de tradutores. Para tanto, percorre o seguinte percurso teórico-metodológico: 1. pontuar direcionamentos teóricos a respeito do Ensino de Tradução Funcionalista com base em Nord (1991, 1994, 1996, 2012; 2. discorrer sobre a elaboração e aplicação dos dispositivos de SD, baseando-se nas contribuições de Dolz e Schneuwly (1998, Cristóvão (2009, 2010, etc.; 3. ilustrar um projeto inicial de SD, com o gênero textual peça de teatro, para futuros tradutores, no par linguístico espanhol-português, incluindo a modelização do gênero, por meio da análise de dez peças hispânicas e brasileiras. Por meio deste percurso, o trabalho pretende mostrar que a proposta de SD, contemplando os direcionamentos do ensino da tradução funcionalista, poderá proporcionar ao futuro tradutor conhecimento sobre os diferentes gêneros textuais e seu funcionamento nas distintas culturas envolvidas na tradução, além de possibilitar: (i o desenvolvimento de capacidades de linguagem na língua-base e na língua-meta; (ii a compreensão da tradução como um processo circular.

  2. Retrievable surface storage: interim storage of solidified high-level waste

    International Nuclear Information System (INIS)

    LaRiviere, J.R.; Nelson, D.C.

    1976-01-01

    Studies have been conducted on retrievable-surface-storage concepts for the interim storage of solidified high-level wastes. These studies have been reviewed by the Panel on Engineered Storage, convened by the Committee on Radioactive Waste Management of the National Research Council-National Academy of Sciences. The Panel has concluded that ''retrievable surface storage is an acceptable interim stage in a comprehensive system for managing high-level radioactive wastes.'' The scaled storage cask concept, which was recommended by the Panel on Engineered Storage, consists of placing a canister of waste inside a carbon-steel cask, which in turn is placed inside a thick concrete cylinder. The waste is cooled by natural convection air flow through an annulus between the cask and the inner wall of the concrete cylinder. The complete assembly is placed above ground in an outdoor storage area

  3. Interim analysis: A rational approach of decision making in clinical trial.

    Science.gov (United States)

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  4. Interim analysis: A rational approach of decision making in clinical trial

    Directory of Open Access Journals (Sweden)

    Amal Kumar

    2016-01-01

    Full Text Available Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  5. Development of dual-purpose metal cask for interim storage of spent nuclear fuel (1). Outline of cask structure

    International Nuclear Information System (INIS)

    Shimizu, Masashi; Hayashi, Makoto; Kashiwakura, Jun

    2003-01-01

    Spent fuels discharged from nuclear power plants in Japan are planed to be reprocessed at the nuclear fuel recycle plant under construction at Rokkasho-mura. Since the amount of the spent fuels exceeds that of recycled fuel, the spent fuels have to be properly stored and maintained as recycle fuel resource until the beginning of the reprocessing. For that sake, interim storage installations are being constructed outside the nuclear power plants by 2010. The storage dry casks have been practically used as the interim storage in the nuclear power plants. From this reason, the storage system using the storage dry casks is promising as the interim storage installations away form the reactors, which are under discussion. In the interim storage facilities, the storage using the dry cask of the storage metal cask with business showings, having the function of transportation is now under discussion. By employing transportation and storage dual-purpose cask, the repack equipments can be exhausted, and the reliability of the interim storage installations can be increased. Hitachi, Ltd. has been developing the high reliable and economical transportation and storage dry metal cask. In this report, the outline of our developing transportation and storage dry cask is described. (author)

  6. Success of Two-Stage Reimplantation in Patients Requiring an Interim Spacer Exchange.

    Science.gov (United States)

    George, Jaiben; Miller, Evan M; Curtis, Gannon L; Klika, Alison K; Barsoum, Wael K; Mont, Michael A; Higuera, Carlos A

    2018-03-23

    Some patients undergoing a 2-stage revision for a periprosthetic joint infection require a repeat spacer in the interim (removal of existing spacer with insertion of a new spacer or spacer exchange) due to persistent infection. The objectives of this study are to (1) determine the factors associated with patients who receive a repeat spacer and (2) compare the infection-free survival (overall and stratified by joint type) of reimplantation in patients who did or did not receive a repeat spacer. From 2001 to 2014, 347 hip or knee 2-stage revisions that finally underwent reimplantation and had a minimum 2-year follow-up were identified. An interim spacer exchange was performed in 59 (17%) patients (exchange cohort). Patient-related and organism-related factors were compared between the exchange and non-exchange cohorts. Kaplan-Meier survival curves were performed to assess the success (absence of signs of infection, reoperation for infection, periprosthetic joint infection-related mortality) of both cohorts. Patients in the exchange group had higher comorbidity score (P = .020), prolonged time to reimplantation (P exchange cohort, and 78% (knee 77%, hip 78%) in the non-exchange cohort (P = .020). Patients requiring an interim spacer exchange were found to have more comorbidities, prolonged treatment period, and were more likely to be infected with a resistant organism. About one-third of such patients became reinfected within 5 years compared to only one-fifth of the patients without an interim spacer exchange. Copyright © 2018 Elsevier Inc. All rights reserved.

  7. 7 CFR 1710.109 - Reimbursement of general funds and interim financing.

    Science.gov (United States)

    2010-01-01

    ... LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.109 Reimbursement of general funds and... replace interim financing used to finance equipment and facilities that were included in an RUS-approved...

  8. Public School Finance Problems in Texas. An Interim Report.

    Science.gov (United States)

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  9. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-06-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The present contribution deals with the cases named under (3) and (4). Cases (1) and (2) were dealt with in a previous article. Relevant contract clauses and laws and their effects on contracting partners are discussed.

  10. Interim supply in the electricity industry

    Energy Technology Data Exchange (ETDEWEB)

    Strassburg, W

    1977-05-01

    The interim supply or the so-called 'condition without a contract' can occur within the framework of energy supply in the relationship between: 1) public utility and tariff customer, 2) public utility and the special last-in-line consumer, 3) supplying and distributing public utility, 4) public utility and territorial administrative body. The contribution at hand deals with the cases under 1) and 2); cases 3) and 4) are dealt with in an article to be published. Relevant contract clauses and laws and their effects on contracting partners are discussed. 41 references.

  11. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  12. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Science.gov (United States)

    2010-07-01

    ...? § 96.360 Interim Safety Management Certificate: what is it and when can it be used? (a) A responsible... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim Safety Management Certificate: what is it and when can it be used? 96.360 Section 96.360 Navigation and Navigable Waters COAST...

  13. SARDULUS SACERENSIS CASALE & MARCIA, NUOVA SPECIE IPOGEA DI COLEOTTERI ISTERIDI DELLA SARDEGNA NORD-OCCIDENTALE E SUA MORFOLOGIA LARVALE (Coleoptera, Histeridae

    Directory of Open Access Journals (Sweden)

    A. Casale

    2006-10-01

    Full Text Available Sardulus sacerensis Casale & Marcia, nuova specie di Histeridae ipogei della Grotta di Lu Gardu (Sassari, Sardegna nord-occidentale è descritta e comparata con le due specie note in precedenza della Sardegna centro-orientale, S. spelaeus Patrizi, 1955, e S. incrassatus Magrini & Fancello, 2005. Le caratteristiche morfologiche esternee i genitali maschili delle tre specie sono raffigurati. Inoltre, è fornita per la prima volta la descrizione della morfologia larvale di una specie di questo genere. S. spelaeus, specie nota fino ad ora di due grotte in territorio di Dorgali, è segnalata di una terza località: la Grotta di Istirzili o Stirzili, nel territorio di Baunei.

  14. NKS-B NordRisk II: Nuclear risk from atmospheric dispersion in Northern Europe - Summary report

    International Nuclear Information System (INIS)

    Lauritzen, B.

    2011-05-01

    The objective of the NordRisk II project has been to derive practical means for assessing the risks from long-range atmospheric dispersion of radioactive materials. An atlas over different atmospheric dispersion and deposition scenarios has been developed using historical numerical weather prediction (NWP) model data. The NWP model data covers three years spanning the climate variability associated with the North Atlantic Oscillation, and the atlas considers radioactive releases from 16 release sites in and near the Nordic countries. A statistical analysis of the long-range dispersion and deposition patterns is undertaken to quantify the mean dispersion and deposition as well as the variability. Preliminary analyses show that the large-scale atmospheric dispersion and deposition is near-isotropic, irrespective of the release site and detailed climatology, and allows for a simple parameterization of the global dispersion and deposition patterns. The atlas and the underlying data are made available in a format compatible with the ARGOS decision support system, and have been implemented in ARGOS. (Author)

  15. NKS-B NordRisk II: Nuclear risk from atmospheric dispersion in Northern Europe - Summary report

    Energy Technology Data Exchange (ETDEWEB)

    Lauritzen, B. (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy. Radiation Research Div., Roskilde (Denmark))

    2011-05-15

    The objective of the NordRisk II project has been to derive practical means for assessing the risks from long-range atmospheric dispersion of radioactive materials. An atlas over different atmospheric dispersion and deposition scenarios has been developed using historical numerical weather prediction (NWP) model data. The NWP model data covers three years spanning the climate variability associated with the North Atlantic Oscillation, and the atlas considers radioactive releases from 16 release sites in and near the Nordic countries. A statistical analysis of the long-range dispersion and deposition patterns is undertaken to quantify the mean dispersion and deposition as well as the variability. Preliminary analyses show that the large-scale atmospheric dispersion and deposition is near-isotropic, irrespective of the release site and detailed climatology, and allows for a simple parameterization of the global dispersion and deposition patterns. The atlas and the underlying data are made available in a format compatible with the ARGOS decision support system, and have been implemented in ARGOS. (Author)

  16. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  17. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  18. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  19. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  20. Environmental survey of two interim dumpsites, Middle Atlantic Bight from 05 November 1973 to 10 November 1973 (NODC Accession 7501280)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A second oceanographic survey cruise was made to an interim municipal sludge dumpsite and initially to an interim dumpsite for the disposal of industrial acid waste...

  1. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  2. Surface Water Interim Measures/Interim Remedial Action Plan/ Environmental and Decision Document, South Walnut Creek Basin, Operable Unit No.2

    International Nuclear Information System (INIS)

    1991-01-01

    Water quality investigations have identified the presence of volatile organic compound (VOC) and radionuclide contamination of surface water at the Rocky Flats Plant (RFP). The subject interim Measures/Interim Remedial Action Plan/Environmental Assessment (IM/IRAP/EA) addresses contaminated surface water in a portion of the South Walnut Creek drainage basin located within an area identified as Operable Unit No. 2 (OU 2). There is no immediate threat to public health and the environment posed by this surface water contamination. The affected surface water is contained within the plant boundary by existing detention ponds, and is treated prior to discharge for removal of volatile contaminants and suspended particulates to which radionuclides, if present, are likely to absorb. However, there is a potential threat and the Department of Energy (DOE) is implementing this Surface Water IM/IRAP at the request of the US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH). Implementation of the Surface Water IM/IRA will enhance the DOE's efforts towards containing and managing contaminated surface water, and will mitigate downgradient migration of contaminants. Another factor in implementing this IM/IRA is the length of time it will take to complete the investigations and engineering studies necessary to determine the final remedy for OU 2. 44 refs., 23 figs., 14 tabs

  3. Les déterminants internes qui évaluent la performance des banques islamiques : cas de la zone de Moyen Orient et Afrique du Nord

    Directory of Open Access Journals (Sweden)

    Hayet Dami

    2017-09-01

    Full Text Available Le but de cette recherche est d’étudier les déterminants internes qui évaluent la performance des 22 banques islamiques cotées en Bourse et ils ont appliqué la même norme comptable internationale dans la zone de Moyen Orient et Afrique du Nord en utilisant une analyse des indicateurs financiers tels que la rentabilité, la liquidité, la solvabilité et le risque de crédit, l’adéquation du capital, l’efficacité opérationnelle et l’efficacité d’allocation des ressources. Nous avons utilisé un modèle MCO avec une régression linéaire multiple comprenant de la variable dépendante (ROA ou ROE et de nombreuses variables indépendantes selon les données du panel. Les résultats empiriques indiquent que la liquidité, l’adéquation du capital, l’efficacité opérationnelle et l’efficacité d’allocation des ressources sont des déterminants significatifs dans notre étude. Par contre, les indicateurs de risque du crédit et la solvabilité ne sont pas significatifs pour évaluer la performance des banques islamiques au Moyen Orient et Afrique du Nord. Notre résultat est robust.

  4. Early rehabilitation of facial defects using interim removable prostheses: A clinical case report

    Directory of Open Access Journals (Sweden)

    Vivekanandhan Ramkumar

    2013-01-01

    Full Text Available Surgical resection of neoplasms or malformations of the face may result in defects that are not amenable to immediate surgical reconstruction. Such defects can have a severe adverse effect on patient perceptions of body image and self-esteem. In these cases, the use of an interim removable facial prosthesis can offer a rapid alternative treatment solution. The patient may then resume social interactions more comfortably while permitting easy access to the facial defect to observe tissue healing while awaiting definitive rehabilitation. This article presents a case report describing the use of interim nasal prostheses to provide rapid patient rehabilitation of facial defects.

  5. Basis for Interim Operation for the K-Reactor in Cold Standby

    Energy Technology Data Exchange (ETDEWEB)

    Shedrow, B.

    1998-10-19

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

  6. Basis for Interim Operation for the K-Reactor in Cold Standby

    International Nuclear Information System (INIS)

    Shedrow, B.

    1998-01-01

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993)

  7. Lessons learned from the Siting Process of an Interim Storage Facility in Spain - 12024

    Energy Technology Data Exchange (ETDEWEB)

    Lamolla, Meritxell Martell [MERIENCE Strategic Thinking, 08734 Olerdola, Barcelona (Spain)

    2012-07-01

    On 29 December 2009, the Spanish government launched a site selection process to host a centralised interim storage facility for spent fuel and high-level radioactive waste. It was an unprecedented call for voluntarism among Spanish municipalities to site a controversial facility. Two nuclear municipalities, amongst a total of thirteen municipalities from five different regions, presented their candidatures to host the facility in their territories. For two years the government did not make a decision. Only in November 30, 2011, the new government elected on 20 November 2011 officially selected a non-nuclear municipality, Villar de Canas, for hosting this facility. This paper focuses on analysing the factors facilitating and hindering the siting of controversial facilities, in particular the interim storage facility in Spain. It demonstrates that involving all stakeholders in the decision-making process should not be underestimated. In the case of Spain, all regional governments where there were candidate municipalities willing to host the centralised interim storage facility, publicly opposed to the siting of the facility. (author)

  8. System Specification for Immobilized High-Level Waste Interim Storage

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository

  9. Application of resistivity measurements to research on structural elements in the Nord-Limousin (France) uraniferous basin (1960)

    International Nuclear Information System (INIS)

    Sarcia, J.A.; Bonnet, J.; Combe, R.

    1960-01-01

    The authors discuss the difficulties encountered in the exploration of a typical deposit in the Nord-Limousin, using the resistivity measurement method. In the zone in question the over-thrust was very variable and difficult to predict. The uraniferous deposits had two types of aspect, the passage from one to the other being often very sudden: long thin veins without gangue; short and thick lens-shape deposits which were strongly contaminated by clay towards their edges. After several unsatisfactory attempts, the device known as the 'rectangular map' was adopted and gave an acceptable structural representation rapidly and cheaply. For the placing of the probes however, methods are required which are more refined and sensitive. It is in any case useless to expect to obtain a satisfactory representation and a sufficient accuracy using a single technique; especially in the region under consideration. (author) [fr

  10. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  11. Interim safety basis compliance matrix for Trenches 31 and 34

    International Nuclear Information System (INIS)

    Ames, R.R.

    1994-01-01

    The tables provided in this document identify the specific requirements and basis for the administrative controls established in the Westinghouse Hanford Company (WHC) Solid Waste Burial Ground (SWBG) Interim Safety Basis (ISB) for operation of the Project W-025, Mixed Waste Lined Landfill (Trenches 31 and 34). The tables document the necessary controls and implementing procedures to ensure compliance with the requirements of the ISB. These requirements provide a basis for future Unreviewed Safety Questions (USQ) screening of applicable procedure changes, proposed physical modifications, tests, experiments, and occurrences. Table 1 provides the SWBG interim Operational Safety Requirements administrative controls matrix. The specific assumptions and commitments used in the safety analysis documents applicable to disposal of mixed wastes in Trenches 31 and 34 are provided in Table 2. Table 3 is provided to document the potential engineered and administrative mitigating features identified in the Preliminary Hazard Analysis (PHA) for disposal of mixed waste

  12. How the University of Texas system responded to the need for interim storage of low-level radioactive waste materials.

    Science.gov (United States)

    Emery, Robert J

    2012-11-01

    Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.

  13. Interim reliability evaluation program, Browns Ferry fault trees

    International Nuclear Information System (INIS)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  14. Repacking of Cobalt 60 spent sources in the central interim storage

    International Nuclear Information System (INIS)

    Zeleznik, N.

    2003-01-01

    After the transfer of the responsibility for the management of the Central interim storage for waste from small producers, located at the reactor centre in Brinje near Ljubljana, Slovenia, the national Agency for radwaste management (ARAO) started with most urgent activities to improve the utilization of the storage facility. One of the main tasks has also been the rearrangement of the already stored radioactive waste in order to reduce volume of the waste and to collect same radioisotopes in the containers. The latest campaign, performed in 2002/2003, was repacking of all Co-60 spent sealed sources in the storage facility and also at the producer's premises which were after conditioning put into two drums with concrete matrix and stored back to the Central interim storage. The preparation works together with the implementation are described in the paper. (author)

  15. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  16. Radiation shielding and dose rate evaluation at the interim storage facility for spent fuel from Cernavoda NPP

    International Nuclear Information System (INIS)

    Stanciu, Marcela; Mateescu, Silvia; Pantazi, Doina; Penescu, Maria

    2000-01-01

    At present studies necessary to license the Interim Storage Facility for the Spent Fuel (CANDU type) from Cernavoda NPP are developed in our country.The spent fuel from Cernavoda NPP is discharged into Spent Fuel Bay in Service Building of the plant, where it remains several years for cooling. After this period, the bundles of spent fuel are to be transferred to the Interim Storage Facility.The dry interim storage solution seems to be the most appropriate variant for Cernavoda NPP.The design of the Spent Fuel Interim Storage Facility must meet the applicable safety requirements in order to ensure radiological protection of the personnel, public and environment during all phases of the facility achievement. In this paper we intend to present the calculation of radiation shielding at the spent fuel interim storage facility for two technical solutions: - Concrete Monolithic Module and Concrete Storage Cask. In order to quantify the fuel composition after irradiation, the isotope generation and depletion code ORIGEN 2.1 has been used, taking into account a cooling time of 7 years and 9 years, respectively, for these two variants. The shielding calculations have been performed using the computer codes QAD-5K and MICROSHIELD-4. The evaluations refer only to gamma radiation because the resulting neutron source (from (α,n) reactions and spontaneous fission) is insignificant as compared to the gamma source. The final results consist in the minimum thickness of the shielding and the corresponding external dose rates, ensuring a design average dose rate based on national and international regulations. (authors)

  17. SCI-NutriNord - a Nordic Initiative on Patient Education on Nutrition for People with Spinal Cord Injury (SCI)

    DEFF Research Database (Denmark)

    Steensgaard, Randi

    2017-01-01

    People with SCI are at high risk of developing secondary conditions of which several are linked to nutrition: overweight/obesity, chronic constipation and/or diarrhea and pressure sores are some examples. Proper nutrition is imperative to prevent and treat these conditions. However, there is a lack...... of evidence-based information materials about healthy eating for people with SCI at least in the Nordic languages. The aim of this multidisciplinary workshop is to: A. Inform about SCI-NutriNord and the first steps that have been taken in developing materials on nutrition as educational teaching aids...... to malnutrition Target group for this workshop is persons who have an interest in problem areas linked to nutrition and SCI, and who want to take part in the development of relevant patient education materials....

  18. Immobilized High-Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report - second Generation Implementing Architecture

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document

  19. In-situ storage: An approach to interim remedial action - recent case studies in Canada

    International Nuclear Information System (INIS)

    Zelmer, R.L.

    1991-01-01

    The Low-Level Radioactive Waste Management Office (LLRWMO) acts on behalf of the federal government to manage historic low-level radioactive wastes. Recent interim remedial work in the Town of Port Hope, Ontario has included the consolidation of radium and uranium contaminated soils into temporary storage facilities on two sites to await final disposal elsewhere. Simple containments constructed and sited on already contaminated sites have been found effective as part of an interim remedial strategy. The approach has been accepted and supported by the local public. Lessons have been learned from a project management, environmental remediation and engineering design point of view

  20. Conceptual design report for regional low-level waste interim storage site

    International Nuclear Information System (INIS)

    Bird, M.V.; Thompson, J.D.

    1981-08-01

    An interim storage site design concept was developed for receiving 100,000 ft 3 low-level waste per year, in the form of solidified wastes in 55-gallon drums with a dose rate of < 200 mrem per hour at contact

  1. Interim Design Report

    CERN Document Server

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  2. Safety of interim storage solutions of used nuclear fuel during extended term

    Energy Technology Data Exchange (ETDEWEB)

    Shelton, C.; Bader, S.; Issard, H.; Arslan, M. [AREVA, 7135 Minstrel Way, Suite 300 Columbia, MD 21045 (United States)

    2013-07-01

    In 2013, the total amount of stored used nuclear fuel (UNF) in the world will reach 225,000 T HM. The UNF inventory in wet storage will take up over 80% of the available total spent fuel pool (SFP) capacity. Interim storage solutions are needed. They give flexibility to the nuclear operators and ensure that nuclear reactors continue to operate. However, we need to keep in mind that they are also an easy way to differ final decision and implementation of a UNF management approach (recycling or final disposal). In term of public perception, they can have a negative impact overtime as it may appear that nuclear industry may have significant issues to resolve. In countries lacking an integrated UNF management approach, the UNF are being discharged from the SFPs to interim storage (mostly to dry storage) at the same rate as UNF is being discharged from reactors, as the SFPs at the reactor sites are becoming full. This is now the case in USA, Taiwan, Switzerland, Spain, South Africa and Germany. For interim storage, AREVA has developed different solutions in order to allow the continued operation of reactors while meeting the current requirements of Safety Authorities: -) Dry storage canisters on pads, -) Dual-purpose casks (dry storage and transportation), -) Vault dry storage, and -) Centralized pool storage.

  3. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  4. Interim FEP report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina (ed.) [Kemakta Konsult AB, Stockholm (Sweden)

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  5. Interim FEP report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2004-08-01

    This report describes the work with identification and structuring of features, events and processes (FEPs) that has been carried out within the scope of the SR-Can safety assessment up to the time of the interim reporting of the project. The overall objective of the work is to develop a database of features, events and processes in a format that would facilitate both a systematic analysis of FEPs and documentation of the FEP analysis as well as facilitate revisions and updates to be made in connection with new safety assessments. This overall objective also includes the development of procedures for a systematic FEP analysis as well as to apply these procedures in order to arrive at an SR-Can version of the FEP database. The work started by implementing the content of the SR 97 Process report into a database format suitable for import and processing of FEP information from other sources. The SR 97 version of the database was systematically audited against the NEA database with Project FEPs, version 1.2. In addition, an earlier audit of the SR 97 process report against the interaction matrices developed for a deep repository of the KBS-3 type was revisited and updated. Relevant FEPs from the audit were sorted into three main categories in the SR-Can database i) FEPs related to the initial states of the repository system, ii) FEPs related to internal processes of the repository system, and iii) FEPs related to external impacts on the repository system. These groups of FEPs were further processed for making decisions on how to handle these FEPs in the assessment. Biosphere processes were not included in the SR 97 Process report and there is thus not the same basis for updating these descriptions as for the engineered barriers and the geosphere. All biosphere FEPs from the audit have therefore been compiled in a single category in the database, but remain to be further handled. FEPs were also categorised as irrelevant or as being related to methodology on a general

  6. 40 CFR 57.302 - Performance level of interim constant controls.

    Science.gov (United States)

    2010-07-01

    ... correction of the effects of any serious deficiencies in the system. For the purpose of this paragraph, at... system if the smelter owner has not upgraded serious deficiencies in the constant control system in... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Performance level of interim constant...

  7. FRACTIONAL CRYSTALLIZATION TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    International Nuclear Information System (INIS)

    HERTING DL

    2008-01-01

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste

  8. Dry storage of spent fuel elements: interim facility

    International Nuclear Information System (INIS)

    Quihillalt, O.J.

    1993-01-01

    Apart from the existing facilities to storage nuclear fuel elements at Argentina's nuclear power stations, a new interim storage facility has been planned and projected by the Argentinean Atomic Energy Commission (CNEA) that will be constructed by private group. This article presents the developments and describes the activities undertaken until the national policy approach to the final decision for the most suitable alternative to be adopted. (B.C.A.). 09 refs, 01 fig, 09 tabs

  9. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  10. Functions and requirements document for interim store solidified high-level and transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture, and interfaces.

  11. Financial compensation for municipalities hosting interim or final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Barboza, Alex; Vicente, Roberto

    2005-01-01

    Brazilian Law No. 10308 issued November 20, 2001, establishes in its 34th article that 'those municipalities hosting interim or final disposal facilities for radioactive waste are eligible to receive a monthly payment as compensation'. The values of due payments depend on parameters such as volume of wastes and activity and half-lives of the radionuclides. The method to calculating those values was established by the National Commission on Nuclear Energy, the Brazilian regulatory authority, by Resolution No. 10, issued in the August 18, 2003. In this paper we report the application of that method to a low- and intermediate-level radioactive waste interim storage facility at the Nuclear Energy Research Institute. (author)

  12. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  13. ETF interim design review

    International Nuclear Information System (INIS)

    Steiner, D.; Rutherford, P.H.

    1980-01-01

    A three-day ETF Interim Design Review was conducted on July 23-25, 1980, at the Sheraton Potomac Inn in Rockville, Maryland. The intent of the review was to provide a forum for an in-depth assessment and critique of all facets of the ETF design by members of the fusion community. The review began with an opening plenary session at which an overview of the ETF design was presented by D. Steiner, manager of the ETF Design Center, complemented by a physics overview by P.H. Rutherford, chairman of the ETF/INTOR Physics Committee. This was followed by six concurrent review sessions over the next day and a half. The review closed with a plenary session at which the Design Review Board presented its findings. This document consists of the viewgraphs for the opening plenary session and an edited version of the presentations made by Steiner and Rutherford

  14. Annex D-200 Area Interim Storage Area Final Safety Analysis Report [FSAR] [Section 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    CARRELL, R D

    2002-07-16

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft{sup 2} and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped off-site to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the Fast Flux Test Facility (FFTF) SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF) TRIGA'--One Rad-Vault' container will store two DOT-6M3 containers and six NRF TRIGA casks currently stored in the 400 Area. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-I cask4 with an inner commercial light water reactor (LWR) canister, will be used for commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available.

  15. Release of radionuclides following severe accident in interim storage facility. Source term determination

    International Nuclear Information System (INIS)

    Morandi, S.; Mariani, M.; Giacobbo, F.; Covini, R.

    2006-01-01

    Among the severe accidents that can cause the release of radionuclides from an interim storage facility, with a consequent relevant radiological impact on the population, there is the impact of an aircraft on the facility. In this work, a safety assessment analysis for the case of an aircraft crash into an interim storage facility is tackled. To this aim a methodology, based upon DOE, IAEA and NUREG standard procedures and upon conservative yet realistic hypothesis, has been developed in order to evaluate the total radioactivity, source term, released to the biosphere in consequence of the impact, without recurring to the use of complicated numerical codes. The procedure consists in the identification of the accidental scenarios, in the evaluation of the consequent damage to the building structures and to the waste packages and in the determination of the total release of radionuclides through the building-atmosphere interface. The methodology here developed has been applied to the case of an aircraft crash into an interim storage facility currently under design. Results show that in case of perforation followed by a fire incident the total released activity would be greater of some orders of magnitude with respect to the case of mere perforation. (author)

  16. Experience with the licensing of the interim spent fuel storage facility modification

    International Nuclear Information System (INIS)

    Bezak, S.; Beres, J.

    1999-01-01

    After political and economical changes in the end of eighties, the utility operating the nuclear power plants in the Slovak Republic (SE, a.s.) decided to change the original scheme of the back-end of the nuclear fuel cycle; instead of reprocessing in the USSR/Russian Federation spent fuel will be stored in an interim spent fuel storage facility until the time of the final decision. As the best solution, a modification of the existing interim spent fuel storage facility has been proposed. Due to lack of legal documents for this area, the Regulatory Authority of the Slovak Republic (UJD SR) performed licensing procedures of the modification on the basis of recommendations by the IAEA, the US NRC and the relevant parts of the US CFR Title 10. (author)

  17. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  18. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    International Nuclear Information System (INIS)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996

  19. Interim Reliability Evaluation Program procedures guide

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gallup, D.R.; Kolaczkowski, A.M.; Kolb, G.J.; Stack, D.W.; Lofgren, E.; Horton, W.H.; Lobner, P.R.

    1983-01-01

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  20. Application of NUREG/CR-5999 interim fatigue curves to selected nuclear power plant components

    International Nuclear Information System (INIS)

    Ware, A.G.; Morton, D.K.; Nitzel, M.E.

    1995-03-01

    Recent test data indicate that the effects of the light water reactor (LWR) environment could significantly reduce the fatigue resistance of materials used in the reactor coolant pressure boundary components of operating nuclear power plants. Argonne National Laboratory has developed interim fatigue curves based on test data simulating LWR conditions, and published them in NUREG/CR-5999. In order to assess the significance of these interim fatigue curves, fatigue evaluations of a sample of the components in the reactor coolant pressure boundary of LWRs were performed. The sample consists of components from facilities designed by each of the four U.S. nuclear steam supply system vendors. For each facility, six locations were studied, including two locations on the reactor pressure vessel. In addition, there are older vintage plants where components of the reactor coolant pressure boundary were designed to codes that did not require an explicit fatigue analysis of the components. In order to assess the fatigue resistance of the older vintage plants, an evaluation was also conducted on selected components of three of these plants. This report discusses the insights gained from the application of the interim fatigue curves to components of seven operating nuclear power plants

  1. Development of a road materials database: Interim Report: 1st draft

    CSIR Research Space (South Africa)

    Jones, DJ

    2003-03-01

    Full Text Available The data required for a road materials database has been identified and a basic structure formulated. A set of Excel workbooks and associated worksheets has been developed as a foundation for the database and as an interim means of gathering test...

  2. Interim Restorative Approach for the Management of Congenitally Missing Permanent Mandibular Incisors: Presentation of Three Cases

    Directory of Open Access Journals (Sweden)

    Prashanth Prakash

    2011-01-01

    Full Text Available Congenital missing of mandibular permanent incisors with retained primary incisors may jeopardize the esthetic appearance and psychological development of children, especially during the years of transition into adolescence. The retained primary teeth are necessary for the maintenance and normal development of alveolar bone, which in turn is essential for future definitive rehabilitation. In such situations, an interim restoration may be provided before any definitive treatment is given to comfort the young patient during this transition period. Interim restorations may include resin-modified additions to the existing teeth as well as more sophisticated restorations such as resin-retained bridge and removable partial dentures. However, this restoration differs for different clinical situations based on various factors such as age and patient compliance, and also consideration has to be given for the growth changes of the child. The aim of this present paper is to discuss the esthetic management of three cases with bilateral agenesis of permanent mandibular incisors and retained primary incisors with composite interim restoration.

  3. Source apportionment of particles at Station Nord, North East Greenland during 2008–2010 using COPREM and PMF analysis

    Directory of Open Access Journals (Sweden)

    Q. T. Nguyen

    2013-01-01

    Full Text Available In order to develop strategies for controlling and reducing Arctic air pollution, there is a need to understand the basic mechanisms for determining the fate of air pollution in the Arctic. Sources of atmospheric particles at Station Nord (81° 36' N, 16° 40' W in North East Greenland were evaluated for a two-year period from March 2008 to February 2010. Source apportionment using Positive Matrix Factorization (PMF and COnstrained Physical REceptor Model (COPREM was based on measurements of black carbon, elements (Al, Si, S, K, Ca, Ti, V, Cr, Mn, Fe, Ni, Cu, Zn, Ga, As, Se, Br, Rb, Sr, Zr, Pb and inorganic ions (SO2, SO42−, Na+, NH4+, NO3, Cl2−. In general, source apportionment results by PMF and COPREM showed good agreement. Five sources adequately explained the measurements, which included a Marine and a Soil source of natural origin and three additional anthropogenic sources, which were all influenced by metal industries. One anthropogenic source was dominated by Zn of which air mass back trajectories using the Hybrid Single Particle Lagrangian Integrated Trajectory (HYSPLIT model suggested a Canadian Arctic origin, despite certain influences from Southern and Eastern origins. Another anthropogenic source was characterised by high concentrations of Pb and As, which has been historically referred to as a Combustion source at Station Nord. The impacts of large-scale industry in Siberia, Russia were evident through high Cu concentrations in both the Combustion source and an additional Cu/Ni source.

    Br correlated well with the anthropogenic species S and Pb though the elements are unlikely to have a common origin. More likely, sulphuric acid aerosols serve as transport containers for Br species of marine origin. Of particular relevance to climate, sources of black carbon were identified to be

  4. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  5. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    Science.gov (United States)

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  6. Students' interim literacies as a dynamic resource for teaching and ...

    African Journals Online (AJOL)

    This article explores the notion of 'interim literacies'by drawing on data from a research project which used linguistic and intertextual analysis of first year student writing in economics to investigate the intersection of academic discourse and student voice. This research has provided a rich set of data to illustrate the ways in ...

  7. Etude nutritive des plats alimentaires et des produits laitiers dans la région de l'extrème-nord Cameroun

    OpenAIRE

    Ponka, Roger

    2013-01-01

    Au cours de ce stage effectué du 06 Novembre 2012 au 01 février 2013, à l’’Unité Mixte de Recherche Science et Technologie du Lait et de l’oeuf de l’INRA Agrocampus-Ouest de Rennes (France), nous avons déterminé la composition nutritionnelle des plats alimentaires et des produits laitiers de la région de l’Extrême-Nord du Cameroun. Ainsi, les teneurs en protéines, lipides, minéraux, acides aminés, vitamines ont été déterminées par les méthodes de référence. La table de composition des aliment...

  8. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  9. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    Science.gov (United States)

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  10. Scientific criteria document for the development of an interim provincial water quality objective for aniline

    Energy Technology Data Exchange (ETDEWEB)

    Angelow, R.V.; Bazinet, N.

    1996-11-01

    The purpose of this document is to develop an interim provincial water quality objective for aniline for the protection of aquatic life in Ontario. It reviews the sources of aniline in the environment, its environmental fate and properties, acute and chronic toxicity as determined from results reported in the literature on toxicity tests using vertebrates and invertebrates, the bioaccumulation of aniline in the environment, mutagenic effects, and threshold aniline concentrations affecting fish odour and taste. The document then explains the derivation of the interim water quality objective. Water quality criteria for aniline developed in other jurisdictions are noted.

  11. Continuous Covariate Imbalance and Conditional Power for Clinical Trial Interim Analyses

    Science.gov (United States)

    Ciolino, Jody D.; Martin, Renee' H.; Zhao, Wenle; Jauch, Edward C.; Hill, Michael D.; Palesch, Yuko Y.

    2014-01-01

    Oftentimes valid statistical analyses for clinical trials involve adjustment for known influential covariates, regardless of imbalance observed in these covariates at baseline across treatment groups. Thus, it must be the case that valid interim analyses also properly adjust for these covariates. There are situations, however, in which covariate adjustment is not possible, not planned, or simply carries less merit as it makes inferences less generalizable and less intuitive. In this case, covariate imbalance between treatment groups can have a substantial effect on both interim and final primary outcome analyses. This paper illustrates the effect of influential continuous baseline covariate imbalance on unadjusted conditional power (CP), and thus, on trial decisions based on futility stopping bounds. The robustness of the relationship is illustrated for normal, skewed, and bimodal continuous baseline covariates that are related to a normally distributed primary outcome. Results suggest that unadjusted CP calculations in the presence of influential covariate imbalance require careful interpretation and evaluation. PMID:24607294

  12. Reinforcement of a PMMA resin for fixed interim prostheses with nanodiamonds.

    Science.gov (United States)

    Protopapa, Popi; Kontonasaki, Eleana; Bikiaris, Dimitrios; Paraskevopoulos, Konstantinos M; Koidis, Petros

    2011-01-01

    The aim of this study was to investigate the possible reinforcement of Nanodiamonds (ND) in a PMMA resin for fixed interim restorations. The fracture toughness (K(Ic)), impact strength and the dynamic thermomechanical properties (T(g), E´, E´´, tanδ) of a series of PMMA-ND nanocomposites with different amounts of ND were evaluated. The fracture toughness increased as the ND percentage increased up to 0.38% wt but a greater amount of ND induced a decrease in K(Ic). Impact strength and Young's modulus were also increased by increasing nanoparticles content, indicating the reinforcing effect of ND. Dynamic mechanical properties were also affected. By increasing the ND content an increase of storage modulus was recorded, while glass transition was shifted at higher temperatures. Under the limitations of this study, it can be suggested that reinforcing PMMA with ND nanoparticles -especially at low concentrations- may increase the overall performance of fixed interim prostheses.

  13. Interim reliability evaluation program (IREP)

    International Nuclear Information System (INIS)

    Carlson, D.D.; Murphy, J.A.

    1981-01-01

    The Interim Reliability Evaluation Program (IREP), sponsored by the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission, is currently applying probabilistic risk analysis techniques to two PWR and two BWR type power plants. Emphasis was placed on the systems analysis portion of the risk assessment, as opposed to accident phenomenology or consequence analysis, since the identification of risk significant plant features was of primary interest. Traditional event tree/fault tree modeling was used for the analysis. However, the study involved a more thorough investigation of transient initiators and of support system faults than studies in the past and substantially improved techniques were used to quantify accident sequence frequencies. This study also attempted to quantify the potential for operator recovery actions in the course of each significant accident

  14. Interim Measures Work Plan Expanded Bioventing System SWMU 55 (IRP Site FT-03)

    National Research Council Canada - National Science Library

    1997-01-01

    This interim measures work plan (IMWP) presents the scope for an expanded bioventing system to conduct in situ treatment of the remaining fuel-contaminated soils at solid waste management unit (SWMU...

  15. Climate change : we are at risk : interim report

    International Nuclear Information System (INIS)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs

  16. Climate change : we are at risk : interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  17. On the pathway towards disposal. The need for long-term interim storage of high-level nuclear waste

    International Nuclear Information System (INIS)

    Budelmann, Harald; Koehnke, Dennis; Reichardt, Manuel

    2017-01-01

    The disposal of spent nuclear fuel is a still unsolved problem with social, ethical, economical, ecological and political dimensions. The stagnating decision process on the final repository concept in several countries has the consequence of the inclusion of long-term interim storage into the disposal concept. The contribution discusses several approaches. This opens the question whether the long-term interim storage is a matter of delaying tactic or a pragmatic solution on the way to a final repository.

  18. "Si le fleuve se tord, que le crocodile se torde" : une analyse des systèmes agraires de la région nord-ouest du Burkina Faso à l'aide des modèles de programmation mathématique

    NARCIS (Netherlands)

    Maatma, Arnoldus Johannes

    2000-01-01

    Le présente étude a pour but d'analyser les perspectives d'intensification durable des systemes de production agricole dans la région Nord-Quest du Burkina Faso par des techniques a faibles couts. Zie: Résumé

  19. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  20. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    Science.gov (United States)

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  1. Safety evaluation for the interim stabilization of Tank 241-C-103

    Energy Technology Data Exchange (ETDEWEB)

    Geschke, G.R.

    1995-03-01

    This document provides the basis for interim stabilization of tank 241-C-103. The document covers the removal of the organic liquid layer and the aqueous supernatant from tank 241-C-103. Hazards are identified, consequences are calculated and controls to mitigate or prevent potential accidents are developed.

  2. Safety evaluation for the interim stabilization of Tank 241-C-103

    International Nuclear Information System (INIS)

    Geschke, G.R.

    1995-03-01

    This document provides the basis for interim stabilization of tank 241-C-103. The document covers the removal of the organic liquid layer and the aqueous supernatant from tank 241-C-103. Hazards are identified, consequences are calculated and controls to mitigate or prevent potential accidents are developed

  3. 400-MWe Consolidated Nuclear Steam System (CNSS). 1200-MWt Phase 2A interim studies

    International Nuclear Information System (INIS)

    1978-09-01

    The Phase 2A interim studies of the Consolidated Nuclear Steam System (CNSS) consisted of a number of separate task studies addressing the design concepts developed during the Phase 1 study reported in BAW--1445. The purpose of the interim studies was to better establish overall concept feasibility from both a hardware and economic standpoint, to make modification and additions to the design where appropriate, and to understand and reduce the technical risks in critical areas of the design. The work on these task studies included input from Barberton, Mt. Vernon, and the Alliance Research Center as well as United Engineers and Constructors (UE and C). The UE and C work was carried out under a separate DOE contract

  4. Annex D-200 Area Interim Storage Area Final Safety Analysis Report [FSAR] [Section 1 and 2

    International Nuclear Information System (INIS)

    CARRELL, R.D.

    2002-01-01

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft 2 and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped off-site to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the Fast Flux Test Facility (FFTF) SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF) TRIGA'--One Rad-Vault' container will store two DOT-6M3 containers and six NRF TRIGA casks currently stored in the 400 Area. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-I cask4 with an inner commercial light water reactor (LWR) canister, will be used for commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available

  5. Data Analysis of GPM Constellation Satellites-IMERG and ERA-Interim precipitation products over West of Iran

    Science.gov (United States)

    Sharifi, Ehsan; Steinacker, Reinhold; Saghafian, Bahram

    2016-04-01

    Precipitation is a critical component of the Earth's hydrological cycle. The primary requirement in precipitation measurement is to know where and how much precipitation is falling at any given time. Especially in data sparse regions with insufficient radar coverage, satellite information can provide a spatial and temporal context. Nonetheless, evaluation of satellite precipitation is essential prior to operational use. This is why many previous studies are devoted to the validation of satellite estimation. Accurate quantitative precipitation estimation over mountainous basins is of great importance because of their susceptibility to hazards. In situ observations over mountainous areas are mostly limited, but currently available satellite precipitation products can potentially provide the precipitation estimation needed for meteorological and hydrological applications. One of the newest and blended methods that use multi-satellites and multi-sensors has been developed for estimating global precipitation. The considered data set known as Integrated Multi-satellitE Retrievals (IMERG) for GPM (Global Precipitation Measurement) is routinely produced by the GPM constellation satellites. Moreover, recent efforts have been put into the improvement of the precipitation products derived from reanalysis systems, which has led to significant progress. One of the best and a worldwide used model is developed by the European Centre for Medium Range Weather Forecasts (ECMWF). They have produced global reanalysis daily precipitation, known as ERA-Interim. This study has evaluated one year of precipitation data from the GPM-IMERG and ERA-Interim reanalysis daily time series over West of Iran. IMERG and ERA-Interim yield underestimate the observed values while IMERG underestimated slightly and performed better when precipitation is greater than 10mm. Furthermore, with respect to evaluation of probability of detection (POD), threat score (TS), false alarm ratio (FAR) and probability

  6. Interim Storage of Spent Nuclear Fuel before Final Disposal in Germany - Regulator's view

    International Nuclear Information System (INIS)

    Arens, G.; Goetz, Ch.; Geupel, Sandra; Gmal, B.; Mester, W.

    2014-01-01

    For spent nuclear fuel management in Germany the concept of dry interim storage in dual purpose casks before direct disposal is applied. The Federal Office for Radiation Protection (BfS) is the competent authority for licensing of interim storage facilities. The competent authority for surveillance of operation is the responsible authority of the respective federal state (Land). Currently operation licenses for storage facilities have been granted for a storage time of 40 years and are based on safety demonstrations for all safety issues as safe enclosure, shielding, sub-criticality and decay heat removal under consideration of operation conditions. In addition, transportability of the casks for the whole storage period has to be provided. Due to current delay in site selection and exploration of a disposal site, an extension of the storage time beyond 40 years could be needed. This will cause appropriate actions by the licensee and the competent authorities as well. A brief description of the regulatory base of licensing and surveillance of interim storage is given from the regulators view. Furthermore the current planning for final disposal of spent nuclear fuel and high level waste and its interconnections between storage and disposal concepts are shortly explained. Finally the relevant aspects for licensing of extended storage time beyond 40 years will be discussed. Current activities on this issue, which have been initiated by the Federal Government, will be addressed. On the regulatory side a review and amendment of the safety guideline for interim storage of spent fuel has been performed and the procedure of periodic safety review is being implemented. A guideline for implementing an ageing management programme is available in a draft version. Regarding safety of long term storage a study focussing on the identification and evaluation of long term effects as well as gaps of knowledge has been finished in 2010. A continuation and update is currently underway

  7. Processus d'innovation et recomposition des territoires agricoles : le cas du semis sous couvert végétal au nord du Cameroun

    OpenAIRE

    Dugué, Patrick; Olina Bassala, Jean-Paul

    2015-01-01

    Au nord du Cameroun, l'adoption des systèmes de culture sous couvert végétal (SCV) butte sur le partage des résidus de culture fourragers en saison sèche entre le bétail et la couverture du sol. Elle nécessite donc d'accroître l'offre fourragère et de prendre en compte les différents types d'élevage (villageois, semi-sédentaire, transhumant, etc.). Dans les conditions actuelles de pratique des SCV par les producteurs (faible couverture du sol, peu d'années successives en SCV) les effets atten...

  8. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  9. Interim policy on establishment and operation of internet open, anonymous information servers and services

    OpenAIRE

    Acting Dean of Computer and Information Services

    1995-01-01

    Purpose. To establish interim NPS general policy regarding establishment and operation of Open, Anonymous Information Servers and Services, such as World Wide Web (http), Gopher, Anonymous FTP, etc...

  10. FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Barnitt, R.

    2010-05-01

    This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

  11. L'exemple d'un décor religieux dans le nord de la France : Bruno Chérier (1817-1880 et Notre-Dame-des-Anges de Tourcoing

    Directory of Open Access Journals (Sweden)

    Catherine Guillot

    2012-04-01

    Full Text Available Ami et modèle du sculpteur Jean-Baptiste Carpeaux, Bruno Chérier (1817 Valenciennes, 1880 Paris se consacre à partir de la fin des années 1850 jusqu'à sa mort au décor religieux dans le nord de la France. Devenu en 1852 professeur aux écoles académiques de Tourcoing, il répond aux commandes les plus variées dans le domaine de l'art religieux. Ainsi, sa participation au décor de l'église Notre-Dame-des-Anges de Tourcoing est exemplaire de la diversité de ses contributions : chemin de croix, cartons de vitraux, peintures ornementales illusionnistes. Cette église constitue en outre dans le Nord un des rares témoignages conservé presque intégralement de l'art religieux dans la seconde moitié du XIXe siècle. La collaboration de Chérier à ce chantier témoigne d'un statut de l'artiste sous le Second Empire, éloigné de l'image romantique du créateur libre dont est redevable le mythe constitué autour de la figure de Carpeaux.Les auteurs préparent une étude globale de l'œuvre de Bruno Chérier et de son rôle auprès de Carpeaux.

  12. L’archipel nord-coréen: transition économique et blocages territoriaux

    Directory of Open Access Journals (Sweden)

    César Ducruet

    2007-09-01

    Full Text Available L’une des caractéristiques récentes de la Corée du Nord est le manque manifeste d’intégration territoriale, en contradiction croissante avec la volonté d’ouverture économique. Dans un environnement mondialisé, le faible coût et la qualité de sa main-d’œuvre, l’abondance des ressources naturelles, et une situation stratégique entre la Corée du Sud, le Japon et leurs voisins continentaux immédiats comme la Chine et la Russie, sont autant d’atouts qui devraient permettre la mise en œuvre des réformes et la relance de l’économie. Tandis que la plupart des travaux précédents se basent sur les facteurs politiques externes pour expliquer les difficultés rencontrées (isolement dû à la disparition du bloc de l’Est, embargo imposé par les États-Unis et le Japon, cet article privilégie les facteurs spatiaux internes. L’examen successif de structures spatiales fondamentales montre que la déconnexion croissante entre les différentes provinces, conséquence d’un long déclin économique et de la dégradation des infrastructures, serait une contrainte majeure avec laquelle les projets de développement du pays sont confrontés, au-delà des aspects purement politiques.

  13. Terrestrial gravity data analysis for interim gravity model improvement

    Science.gov (United States)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  14. T-TY Tank Farm Interim Surface Barrier Demonstration - Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z.F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy's Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  15. Current status of the first interim spent fuel storage facility in Japan

    International Nuclear Information System (INIS)

    Shinbo, Hitoshi; Kondo, Mitsuru

    2008-01-01

    In Japan, storage of spent fuels outside nuclear power plants was enabled as a result of partial amendments to the Nuclear Reactor Regulation Law in June 2000. Five months later, Mutsu City in Aomori Prefecture asked the Tokyo Electric Power Company (TEPCO) to conduct technical surveys on siting of the interim spent fuel storage facility (we call it 'Recyclable-Fuel Storage Center'). In April 2003, TEPCO submitted the report on siting feasibility examination, concluded that no improper engineering data for siting, construction of the facility will be possible from engineering viewpoint. Siting Activities for publicity and public acceptance have been continued since then. After these activities, Aomori Prefecture and Mutsu City approved siting of the Recyclable Fuel Storage Center in October 2005. Aomori Prefecture, Mutsu City, TEPCO and Japan Atomic Power Company (JAPC) signed an agreement on the interim spent fuel storage Facility. A month later, TEPCO and JAPC established Recyclable-Fuel Storage Company (RFS) in Mutsu City through joint capital investment, specialized in the first interim spent fuel storage Facility in Japan. In May 2007, we made an application for establishment permit, following safety review by regulatory authorities. In March 2008, we started the preparatory construction. RFS will safely store of spent fuels of TEPCO and JAPC until they will be reprocessed. Final storage capacity will be 5,000 ton-U. First we will construct the storage building of 3,000 ton-U to be followed by second building. We aim to start operation by 2010. (author)

  16. NKS NordRisk II: Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    International Nuclear Information System (INIS)

    Smith Korsholm, U.; Havskov Soerensen, J.; Astrup, P.; Lauritzen, B.

    2011-04-01

    The present atlas has been developed within the NKS/NordRisk-II project 'Nuclear risk from atmospheric dispersion in Northern Europe'. The atlas describes risks from hypothetical long-range dispersion and deposition of radionuclides from 16 nuclear risk sites on the Northern Hemisphere. The atmospheric dispersion model calculations cover a period of 30 days following each release to ensure almost complete deposition of the dispersed material. The atlas contains maps showing the total deposition and time-integrated air concentration of Cs-137 and I-131 based on three years of meteorological data spanning the climate variability associated with the North Atlantic Oscillation, and corresponding time evolution of the ensemble mean atmospheric dispersion. (Author)

  17. Les premiers temps de l'architecture en briques au nord des Alpes : la question de l'origine cistercienne vue des Pays-Bas

    OpenAIRE

    Lehouck, Alexander

    2017-01-01

    L'argile est l'une des plus vieilles matières premières pour la fabrication de matériaux de construction. La chute de l'Empire romain a marqué la fin de l'utilisation de la brique au nord des Alpes. La brique ne ressurgit véritablement qu' à partir de la deuxième moitié du XIIe s. et de la première moitié du XIIe s.; dans la deuxième moitié du XIIIe s., la brique était devenue le matériau de construction le plus utilisé. Dans cet article, nous discutons les données concernant les premiers ...

  18. NKS NordRisk II: Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    Energy Technology Data Exchange (ETDEWEB)

    Smith Korsholm, U.; Havskov Soerensen, J. (Danish Meteorological Institute (DMI), Copenhagen (Denmark)); Astrup, P.; Lauritzen, B. (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy. Radiation Research Div., Roskilde (Denmark))

    2011-04-15

    The present atlas has been developed within the NKS/NordRisk-II project 'Nuclear risk from atmospheric dispersion in Northern Europe'. The atlas describes risks from hypothetical long-range dispersion and deposition of radionuclides from 16 nuclear risk sites on the Northern Hemisphere. The atmospheric dispersion model calculations cover a period of 30 days following each release to ensure almost complete deposition of the dispersed material. The atlas contains maps showing the total deposition and time-integrated air concentration of Cs-137 and I-131 based on three years of meteorological data spanning the climate variability associated with the North Atlantic Oscillation, and corresponding time evolution of the ensemble mean atmospheric dispersion. (Author)

  19. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  20. Nuclear waste: Is there a need for federal interim storage

    International Nuclear Information System (INIS)

    1989-01-01

    The Congress created the Monitored Retrievable Storage Review Commission to provide a report on the need for a Federal monitored retrievable storage facility (MRS) as part of the Nation's nuclear waste management system. The Commission concludes that the MRS as presently described in the law, which links the capacity and schedule of operation of the MRS to a permanent geologic repository, cannot be justified. The Commission finds, however, that while no single factor would favor an MRS over the No-MRS option, cumulatively the advantages of an MRS would justify the building of an MRS if: there were no linkages between the MRS and the repository; the MRS could be constructed at an early date; and the opening of the repository were delayed considerably beyond its presently scheduled date of operation. The Commission therefore recommends that the Congress take the following actions: Authorize construction of a Federal Emergency Storage facility with a capacity limit of 2,000 metric tons of uranium; Authorize construction of a User-Funded Interim Storage facility with a capacity limit of 5,000 metric tons of uranium; Reconsider the subject of interim storage by the year 2000

  1. Annex D 200 Area Interim Storage Area Final Safety Analysis Report Volume 5 (FSAR) (Section 1 and 2)

    International Nuclear Information System (INIS)

    CARRELL, R.D.

    2003-01-01

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft 2 and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped offsite to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility (FFTF) Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the FFTF SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF)TRIGA--One Rad-Vault container stores two DOT-6M 3 containers and six NRF TRIGA casks. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-1 cask with an inner commercial light water reactor (LWR) canister, are used for storing commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available

  2. Concepts for the interim storage of spent fuel elements from research reactors in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Niephaus, D.; Bensch, D.; Quaassdorff, P.; Plaetzer, S.

    1997-01-01

    Research reactors have been operated in the Federal Republic of Germany since the late fifties. These are Material Test Reactors (MTR) and training, Research and Isotope Facilities of General Atomic (TRIGA). A total of seven research reactors, i.e. three TRIGA and four MTR facilities were still in operation at the beginning of 1996. Provisions to apply to the back-end of the fuel cycle are required for their continued operation and for already decommissioned plants. This was ensured until the end of the eighties by the reprocessing of spent fuel elements abroad. In view of impeding uncertainties in connection with waste management through reprocessing abroad, the development of a national back-end fuel cycle concept was commissioned by the Federal Minister of Education, Science, Research and Technology in early 1990. Development work was oriented along the lines of the disposal concept for irradiated light-water reactor fuel elements from nuclear power plants. Analogously, the fuel elements from research reactors are to be interim-stored on a long-term basis in adequately designed transport and storage casks and then be directly finally disposed without reprocessing after up to forty years of interim storage. As a first step in the development of a concept for interim storage, several sites with nuclear infrastructure were examined and assessed with respect to their suitability for interim storage. A reasonably feasible reference concept for storing the research reactor fuel elements in CASTOR MTR 2 transport and storage casks at the Ahaus interim storage facility (BZA) was evaluated and the hot cell facility and AVR store of Forschungszentrum Juelich (KFA) were proposed as an optional contingency concept for casks that cannot be repaired at Ahaus. Development work was continued with detailed studies on these two conceptual variants and the results are presented in this paper. (author)

  3. Implementation of the Ryan Haight Online Pharmacy Consumer Protection Act of 2008. Interim final rule with request for comments.

    Science.gov (United States)

    2009-04-06

    The Ryan Haight Online Pharmacy Consumer Protection Act, which was enacted on October 15, 2008, amended the Controlled Substances Act and Controlled Substances Import and Export Act by adding several new provisions to prevent the illegal distribution and dispensing of controlled substances by means of the Internet. DEA is hereby issuing an interim rule to amend its regulations to implement the legislation and is requesting comments on the interim rule.

  4. Criticality safety evaluation for long term storage of FFTF fuel in interim storage casks

    International Nuclear Information System (INIS)

    Richard, R.F.

    1995-01-01

    It has been postulated that a degradation phenomenon, referred to as ''hot cell rot'', may affect irradiated FFTF mixed plutonium-uranium oxide (MOX) fuel during dry interim storage. ''Hot cell rot'' refers to a variety of phenomena that degrade fuel pin cladding during exposure to air and inert gas environments. It is thought to be a form of caustic stress corrosion cracking or environmentally assisted cracking. Here, a criticality safety analysis was performed to address the effect of the ''hot cell rot'' phenomenon on the long term storage of irradiated FFTF fuel in core component containers. The results show that seven FFTF fuel assemblies or six Ident-69 pin containers stored in core component containers within interim storage casks will remain safely subcritical

  5. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  6. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Science.gov (United States)

    2010-10-01

    ... OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in § 308.3) and the Second Seamen's War Risk Policy (1955) (set forth in § 308.306) to the same extent as...

  7. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    Energy Technology Data Exchange (ETDEWEB)

    Stahl, S.M.

    1994-12-30

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts.

  8. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    International Nuclear Information System (INIS)

    Stahl, S.M.

    1994-01-01

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts

  9. Cna 1 spent fuel element interim dry storage system thermal analysis

    International Nuclear Information System (INIS)

    Hilal, R. E; Garcia, J. C; Delmastro, D. F

    2006-01-01

    At the moment, the Atucha I Nuclear Power Plant (Cnea-I) located in the city of Lima, has enough room to store its spent fuel (Sf) in their two pools spent fuel until about 2015.In case of life extension a spend fuel element interim dry storage system is needed.Nucleolectrica Argentina S.A. (N A-S A) and the Comision Nacional de Energia Atomica (Cnea), have proposed different interim dry storage systems.These systems have to be evaluated in order to choose one of them.The present work's objective is the thermal analysis of one dry storage alternative for the Sf element of Cna 1.In this work a simple model was developed and used to perform the thermal calculations corresponding to the system proposed by Cnea.This system considers the store of sealed containers with 37 spent fuels in concrete modules.Each one of the containers is filled in the pool houses and transported to the module in a transference cask with lead walls.Fulfill the maximum cladding temperature requirement ( [es

  10. Hanford low-level tank waste interim performance assessment

    International Nuclear Information System (INIS)

    Mann, F.M.

    1997-01-01

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives

  11. 24 CFR 982.516 - Family income and composition: Regular and interim examinations.

    Science.gov (United States)

    2010-04-01

    ... VOUCHER PROGRAM Rent and Housing Assistance Payment § 982.516 Family income and composition: Regular and... assistance payment. (For a voucher tenancy, the housing assistance payment shall be calculated in accordance... the housing assistance payment resulting from an interim redetermination. (2) At the effective date of...

  12. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1997-01-01

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations

  13. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, W.W.

    1997-12-30

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations.

  14. EFFECT OF REHABILITATION DURING INTERIM STAY IN AALBORG MUNICIPALITY, DENMARK: A STUDY PROTOCOL

    DEFF Research Database (Denmark)

    Villumsen, Sidsel Maria Monrad; Villumsen, Morten

    2016-01-01

    Background: In the municipality of Aalborg, Denmark, the aim is to support citizens’ rehabilitation through training and learning in order to be self-reliant. This effort is supported at interim stays at the nursing homes [1]. A recent external report has outlined that citizen are highly satis ed...... are available in the systems, containing information on rehabilitation services rendered during interim stays. However, available data on the effect of the rehabilitation are currently unstructured in free-text, which impedes the assessment of rehabilitation effect and thereby the quality assurance. Objectives...... on rehabilitation of the citizen. The rehabilitation effect will be extracted from the free-text in the records. The free-text will be categorized into rehabilitation effects of i) deterioration, ii) no effect, iii) effect of rehabilitation, or iv) not possible to classify from the text. Results: This study...

  15. Reinforcement of a PMMA resin for interim fixed prostheses with silica nanoparticles.

    Science.gov (United States)

    Topouzi, Marianthi; Kontonasaki, Eleana; Bikiaris, Dimitrios; Papadopoulou, Lambrini; Paraskevopoulos, Konstantinos M; Koidis, Petros

    2017-05-01

    Fractures in long span provisional/interim restorations are a common complication. Adequate fracture toughness is necessary to resist occlusal forces and crack propagation, so these restorations should be constructed with materials of improved mechanical properties. The aim of this study was to investigate the possible reinforcement of neat silica nanoparticles and trietoxyvinylsilane-modified silica nanoparticles in a PMMA resin for fixed interim restorations. Composite PMMA-Silica nanoparticles powders were mixed with PMMA liquid and compact bar shaped specimens were fabricated according to the British standard BS EN ISO 127337:2005. The single-edge notched method was used to evaluate fracture toughness (three-point bending test), while the dynamic thermomechanical properties (Storage Modulus, Loss Modulus, tanδ) of a series of nanocomposites with different amounts of nanoparticles (0.25%, 0.50%, 0.75%, 1% w.t.) were evaluated. Statistical analysis was performed and the statistically significant level was set to pPMMA resins used in fixed provisional restorations. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Analysis of the interim safe storage of reactors at the Hanford site

    International Nuclear Information System (INIS)

    Wang Hailiang

    2014-01-01

    The nine production reactors, i.e. B, C, D, DR, F, H, KE, KW and N, at the Hanford site are all water-cooled and graphite-moderated reactors with natural uranium fuel. In 1993, the U.S. Department of Energy (DOE) decided to put eight production reactors (except for B) into Interim Safe Storage (ISS) for 75 years followed by deferred one-piece removal. Reactor B will remain as a national historical landmark. By the end of 2013, six reactors C, F, D, DR, H and N had been successfully put into the ISS. Reactors KE and KW will be put into the ISS in the coming years. Taking reactor C as an example, this paper mainly talks about how to put the production reactors in the Interim Safe Storage, e.g. how to make site preparation, how to construct the safe storage enclosure (SSE) and how to perform surveillance and maintenance during the ISS period, etc. (authors)

  17. Transport casks help solve spent fuel interim storage problems

    International Nuclear Information System (INIS)

    Dierkes, P.; Janberg, K.; Baatz, H.; Weinhold, G.

    1980-01-01

    Transport casks can be used as storage modules, combining the inherent safety of passive cooling with the absence of secondary radioactive waste and the flexibility to build up storage capacity according to actual requirements. In the Federal Republic of Germany, transport casks are being developed as a solution to its interim storage problems. Criteria for their design and licensing are outlined. Details are given of the casks and the storage facility. Tests are illustrated. (U.K.)

  18. 400-MWe Consolidated Nuclear Steam System (CNSS). 1200-MWt Phase 2A interim studies. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    1978-09-01

    The Phase 2A interim studies of the Consolidated Nuclear Steam System (CNSS) consisted of a number of separate task studies addressing the design concepts developed during the Phase 1 study reported in BAW--1445. The purpose of the interim studies was to better establish overall concept feasibility from both a hardware and economic standpoint, to make modification and additions to the design where appropriate, and to understand and reduce the technical risks in critical areas of the design. The work on these task studies included input from Barberton, Mt. Vernon, and the Alliance Research Center as well as United Engineers and Constructors (UE and C). The UE and C work was carried out under a separate DOE contract.

  19. Safety report for Central Interim Storage facility for radioactive waste from small producers

    International Nuclear Information System (INIS)

    Zeleznik, N.; Mele, I.

    2004-01-01

    In 1999 the Agency for Radwaste Management took over the management of the Central Interim Storage (CIS) in Brinje, intended only for radioactive waste from industrial, medical and research applications. With the transfer of the responsibilities for the storage operation, ARAO, the new operator of the facility, received also the request from the Slovenian Nuclear Safety Administration for refurbishment and reconstruction of the storage and for preparation of the safety report for the storage with the operational conditions and limitations. In order to fulfill these requirements ARAO first thoroughly reviewed the existing documentation on the facility, the facility itself and the stored inventory. Based on the findings of this review ARAO prepared several basic documents for improvement of the current conditions in the storage facility. In October 2000 the Plan for refurbishment and modernization of the CIS was prepared, providing an integral approach towards remediation and refurbishment of the facility, optimization of the inventory arrangement and modernization of the storage and storing utilization. In October 2001 project documentation for renewal of electric installations, water supply and sewage system, ventilation system, the improvements of the fire protection and remediation of minor defects discovered in building were completed according to the Act on Construction. In July 2003 the safety report was prepared, based on the facility status after the completion of the reconstruction works. It takes into account all improvements and changes introduced by the refurbishment and reconstruction of the facility according to project documentation. Besides the basic characteristics of the location and its surrounding, it also gives the technical description of the facility together with proposed solutions for the renewal of electric installations, renovation of water supply and sewage system, refurbishment of the ventilation system, the improvement of fire

  20. Fabrication of an interim complete removable dental prosthesis with an in-office digital light processing three-dimensional printer: A proof-of-concept technique.

    Science.gov (United States)

    Lin, Wei-Shao; Harris, Bryan T; Pellerito, John; Morton, Dean

    2018-04-30

    This report describes a proof of concept for fabricating an interim complete removable dental prosthesis with a digital light processing 3-dimensional (3D) printer. Although an in-office 3D printer can reduce the overall production cost for an interim complete removable dental prosthesis, the process has not been validated with clinical studies. This report provided a preliminary proof of concept in developing a digital workflow for the in-office additively manufactured interim complete removable dental prosthesis. Copyright © 2018 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  1. Bilateral contracts and the spot market for electricity: some observations on the British and the NordPool experiences

    International Nuclear Information System (INIS)

    Herguera, Inigo

    2000-01-01

    The performance of the futures and the spot market for electricity in England and Wales (EW) and in the Nordic countries have significant differences in terms of volumes traded and evolution of prices. Even though the institutional arrangements show significant differences and the data collected has important limitations we observe in EW for 1990-199 that as the coverage via bilateral contracts diminished, spot prices tended to increase, there was higher price volatility and an increasing number of plants were declared unavailable. In the NordPool, by contrast, market structure is more distributed, the bilateral contract price has tended to smooth the volatility in the spot price and a very diverse pattern behavior of prices has been observed. We interpret these observations as additional support in favor of the theoretical result by and Vila (Journal of Economic Theory 59 (1993) 1), but hint at the possibility of strategies by the firms that can diminish the welfare enhancing properties of this new bilateral market. (Author)

  2. Cost Implications of an Interim Storage Facility in the Waste Management System

    Energy Technology Data Exchange (ETDEWEB)

    Jarrell, Joshua J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Joseph, III, Robert Anthony [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howard, Rob L [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Petersen, Gordon M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Nutt, Mark [Argonne National Lab. (ANL), Argonne, IL (United States); Carter, Joe [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Cotton, Thomas [Complex Systems Group, Bozeman, MT (United States)

    2016-09-01

    This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.

  3. First interim examination of defected BWR and PWR rods tested in unlimited air at 2290C

    International Nuclear Information System (INIS)

    Einziger, R.E.; Cook, J.A.

    1983-01-01

    A five-year whole rod test was initiated to investigate the long-term stability of spent fuel rods under a variety of possible dry storage conditions. Both PWR and BWR rods were included in the test. The first interim examination was conducted after three months of testing to determine if there was any degradation in those defected rods stored in an unlimited air atmosphere. Visual observations, diametral measurements and radiographic smears were used to assess the degree of cladding deformation and particulate dispersal. The PWR rod showed no measurable change from the pre-test condition. The two original artificial defects had not changed in appearance and there was no diametral growth of the cladding. One of the defects in BWR rod showed significant deformation. There was approximately 10% cladding strain at the defect site and a small axial crack had formed. The fuel in the defect did not appear to be friable. The second defect showed no visible change and no cladding strain. Following examination, the test was continued at 230 0 C. Another interim examination is planned during the summer of 1983. This paper discusses the details and meaning of the data from the first interim examination

  4. A web-based endpoint adjudication system for interim analyses in clinical trials.

    Science.gov (United States)

    Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis

    2009-02-01

    A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However

  5. 105-H Reactor Interim Safe Storage Project Final Report

    International Nuclear Information System (INIS)

    Ison, E.G.

    2008-01-01

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D and D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  6. Interim dry storage system technologies and innovations VARNA 2002

    International Nuclear Information System (INIS)

    Chollet, P.; Guenon, Y.

    2002-01-01

    The main concepts of the TN24 Family and NUHOMS System are explained in the paper. It is discussed how the NPPs specific requirements and economics trends contributes to the growing families of interim dry storage systems delivered under COGEMA LOGICTICS license. It is concluded that modular solutions are currently dominating because they are derived from main concepts evolved over time, benefited from both the transport aspects with internationally recognised stringent regulations, and various specific ISFSI requirements and economic trends

  7. Waste Encapsulation and Storage Facility interim operational safety requirements

    CERN Document Server

    Covey, L I

    2000-01-01

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  8. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Science.gov (United States)

    2011-12-01

    ... for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance... (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam Generators.'' This LR-ISG provides the...) document, NEI 97-06, ``Steam Generator Program Guidelines,'' (NRC's Agencywide Documents Access and...

  9. Interim Report on the Investigation of the Fresh Properties of Synthetic Fiber-Reinforced Concrete for the Richardson Landing Casting Field

    Science.gov (United States)

    2017-04-01

    ER D C/ G SL S R- 17 -1 Interim Report on the Investigation of the Fresh Properties of Synthetic Fiber - Reinforced Concrete for the...default. ERDC/GSL SR-17-1 April 2017 Interim Report on the Investigation of the Fresh Properties of Synthetic Fiber - Reinforced Concrete for... reinforced concrete mixtures containing 3-, 2-, and 1-lb(s)/yd3, respectively, of synthetic (polypropylene) fiber into the current mixture proportion

  10. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    International Nuclear Information System (INIS)

    Stahl, S.M.

    1994-01-01

    This report provides results of a review of recently completed safety analyses related to hazards associated with Interim Stabilization of Single analyses related to hazards included oh the Hanford Site Waste Tank-Watch Shell Tanks (SSTs) that are included on the Hanford List. The purpose of the review was to identify and summarize conclusions regarding the safety of interim stabilization of Watch List SSTs, and to highlight applicable limitations, restrictions, and controls. The scope of this review was restricted to SSTs identified List in the categories of flammable gas ferrocyanide, and organic salts. High heat tanks were not included in the scope. A Watch List tank is defined as an underground storage tank containing waste that requires special safety precautions because it may have a serious potential for release of high level radioactive waste because of uncontrolled increases in temperature or pressure. Special restrictions have been placed on these tanks

  11. The challenges facing the long term interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Iracane, D. [CEA Sacaly, Dir. de la Simulation et des Outils Experimentaux-DSOE, 91 - Gif sur Yvette (France); Marvy, A. [CEA Saclay, Dir. du Developpement et de l' Innovation Nucleares-DDIN, 91 - Gif Sur Yvette (France)

    2001-07-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  12. The challenges facing the long term interim storage

    International Nuclear Information System (INIS)

    Iracane, D.; Marvy, A.

    2001-01-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  13. Hierarchies of belief and interim rationalizability

    Directory of Open Access Journals (Sweden)

    Jeffrey C. Ely

    2006-03-01

    Full Text Available In games with incomplete information, conventional hierarchies of belief are incomplete as descriptions of the players' information for the purposes of determining a player's behavior. We show by example that this is true for a variety of solution concepts. We then investigate what is essential about a player's information to identify behavior. We specialize to two player games and the solution concept of interim rationalizability. We construct the universal type space for rationalizability and characterize the types in terms of their beliefs. Infinite hierarchies of beliefs over conditional beliefs, which we call Delta-hierarchies, are what turn out to matter. We show that any two types in any two type spaces have the same rationalizable sets in all games if and only if they have the same Delta-hierarchies.

  14. Progress and future direction for the interim safe storage and disposal of Hanford high level waste (HLW)

    International Nuclear Information System (INIS)

    Wodrich, D.D.

    1996-01-01

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the US DOE and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described

  15. Are electricity risk premia affected by emission allowance prices? Evidence from the EEX, Nord Pool and Powernext

    International Nuclear Information System (INIS)

    Daskalakis, George; Markellos, Raphael N.

    2009-01-01

    The links between emission and energy markets are of great interest to practitioners, academics and policy makers. In this paper, it is conjectured that a positive relationship exists between emission allowance spot returns and electricity risk premia within the European Union Emissions Trading Scheme (EU ETS). We discuss how this can be justified on the basis of the substantial uncertainties in the carbon markets. We also argue that this link could be due to trading strategies followed by electricity producers who attempt to exploit their initial allocation of free allowances. Analysis of data from three major markets, the EEX, Nord Pool and Powernext, offers empirical support to our conjecture. These findings have significant policy implications since they imply that efforts should be made in order to reduce the uncertainty in the carbon markets by clearly defining the EU ETS regulative framework and design over the next years. Moreover, our results suggest that the allocation of free allowances and their unrestricted trading enable electricity producers to accomplish windfall profits in the derivatives market at the expense of other market participants. (author)

  16. The PDF4LHC Working Group Interim Report

    CERN Document Server

    Alekhin, Sergey; Ball, Richard D.; Bertone, Valerio; Blumlein, Johannes; Botje, Michiel; Butterworth, Jon; Cerutti, Francesco; Cooper-Sarkar, Amanda; de Roeck, Albert; Del Debbio, Luigi; Feltesse, Joel; Forte, Stefano; Glazov, Alexander; Guffanti, Alberto; Gwenlan, Claire; Huston, Joey; Jimenez-Delgado, Pedro; Lai, Hung-Liang; Latorre, Jose I.; McNulty, Ronan; Nadolsky, Pavel; Olaf Moch, Sven; Pumplin, Jon; Radescu, Voica; Rojo, Juan; Sjostrand, Torbjorn; Stirling, W.J.; Stump, Daniel; Thorne, Robert S.; Ubiali, Maria; Vicini, Alessandro; Watt, Graeme; Yuan, C.-P.

    2011-01-01

    This document is intended as a study of benchmark cross sections at the LHC (at 7 TeV) at NLO using modern parton distribution functions currently available from the 6 PDF fitting groups that have participated in this exercise. It also contains a succinct user guide to the computation of PDFs, uncertainties and correlations using available PDF sets. A companion note, also submitted to the archive, provides an interim summary of the current recommendations of the PDF4LHC working group for the use of parton distribution functions and of PDF uncertainties at the LHC, for cross section and cross section uncertainty calculations.

  17. AACP Special Taskforce on Diversifying Our Investment in Human Capital Interim Update.

    Science.gov (United States)

    White, Carla; Adams, Jennifer

    2016-09-25

    The 2015-2017 AACP Special Taskforce on Diversifying our Investment in Human Capital was appointed for a two-year term, therefore the interim update from the Taskforce. A full report will be provided in 2017 in the form of a white paper for academic pharmacy on diversifying our investment in human capital.

  18. Interim storage is not long-term disposal

    International Nuclear Information System (INIS)

    Vincenti, J.R.

    1994-01-01

    Starting in June 30, 1994 South Carolina enforced an embargo on regular shipments of low-level radioactive waste to the Barnwell repository. The failure of 31 states and their respective compacts to provide access to a long-term disposal facility as stipulated by the low-level radioactive Waste Policy Act of 1980 promotes waste disposal gridlock and anticipates another waste disposal crisis. This article discusses the problem using the following topics: Appalachian Compact Users of Radioactive Isotopes (ACURI) Association's interest; the problem of denial of access to Barnwell; pro and contra interim storage; vital services and benefits at risk; issues at the ACURI meeting; nobel Prize winners use radioactive materials; if perception is reality, politics is prevalent

  19. Timing of metamorphism and exhumation in the Nordøyane ultra-high-pressure domain, Western Gneiss Region, Norway: New constraints from complementary CA-ID-TIMS and LA-MC-ICP-MS geochronology

    Science.gov (United States)

    Butler, J. P.; Jamieson, R. A.; Dunning, G. R.; Pecha, M. E.; Robinson, P.; Steenkamp, H. M.

    2018-06-01

    We present the results of a combined CA-ID-TIMS and LA-MC-ICP-MS U-Pb geochronology study of zircon and associated rutile and titanite from the Nordøyane ultra-high-pressure (UHP) domain in the Western Gneiss Region (WGR) of Norway. The dated samples include 4 eclogite bodies, 2 host-rock migmatites, and 2 cross-cutting pegmatites and leucosomes, all from the island of Harøya. Zircon from a coesite eclogite yielded an age of ca. 413 Ma, interpreted as the time of UHP metamorphism in this sample. Zircon data from the other eclogite bodies yielded metamorphic ages of ca. 413 Ma, 407 Ma, and 406 Ma; zircon trace-element data associated with 413 Ma and 407 Ma ages are consistent with eclogite-facies crystallization. In all of the eclogites, U-Pb dates from zircon cores, interpreted as the times of protolith crystallization, range from ca. 1680-1586 Ma, consistent with Gothian ages from orthogneisses in Nordøyane and elsewhere in the WGR. A zircon core age of ca. 943 Ma from one sample agrees with Sveconorwegian ages of felsic gneisses and pegmatites in the western part of the area. Migmatites hosting the eclogite bodies yielded zircon core ages of ca. 1657-1591 Ma and rim ages of ca. 395-392 Ma, interpreted as the times of Gothian protolith formation and Scandian partial melt crystallization, respectively. Pegmatite in an eclogite boudin neck yielded a crystallization age of ca. 388 Ma, interpreted as the time of melt crystallization. Rutile and titanite from 3 samples (an eclogite and two migmatites) yielded concordant ID-TIMS ages of 378-376 Ma. The results are similar to existing U-Pb data from other Nordøyane eclogites (415-405 Ma). In combination with previous pressure-temperature data from the coesite eclogite, these ages indicate that peak metamorphic conditions of 3 GPa/760 °C were reached ca. 413 Ma, followed by decompression to 1 GPa/810 °C by ca. 397 Ma and cooling below ca. 600 °C by ca. 375 Ma. The results are compatible with protracted UHP

  20. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    Energy Technology Data Exchange (ETDEWEB)

    T. A. Lee

    2005-09-15

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  1. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    International Nuclear Information System (INIS)

    Lee, T.A.

    2005-01-01

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  2. Breaking the Cycle of Drug Abuse. 1993 Interim National Drug Control Strategy.

    Science.gov (United States)

    Office of National Drug Control Policy, Washington, DC.

    This Interim Drug Strategy is intended to give a new sense of direction and to reinvigorate the nation's efforts against drug trafficking and abuse. The preface to the report lists eight new strategies that the Administration will implement: (1) make drug policy a cornerstone of domestic and social policy; (2) target pregnant women, children, and…

  3. Fast Flux Test Facility interim examination and maintenance cell - past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The first 10 yr of operation were mainly devoted to the disassembly and examination of core component test assemblies. While some maintenance was performed on reactor support equipment, such as the closed-loop ex-vessel machine (CLEM) sodium-wetted grapple, 90% of IEM cell availability has been devoted to core component tests. Some test assemblies originally considered for processing in the IEM cell have not been irradiated; others, not originally planned, have been designed, irradiated, and processed. While no major reactor equipment has required remote repair or maintenance, the IEM cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished and are described

  4. 200-ZP-1 phase 2 interim remedial measure quarterly report, August--October 1996

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.; Jacques, I.D.; McMahon, W.J.; Singleton, K.M.; Strope, S.A.; Swanson, L.C.; Windmueller, C.R.

    1996-11-01

    A groundwater pump-and-treat system is being operated in the 200-ZP-1 Operable Unit under authority of the Hanford Federal Facility Agreement and Consent Order . The purpose of the pump-and-treat system is to accomplish the following: Minimize further migration of the high-concentration portion of the carbon tetrachloride plume and co-contaminants chloroform and trichlorethylene in the 200-ZP-1 Operable Unit Provide data for evaluation of final remedy selection. The 200-ZP-1 pump-and-treat operations were conducted as a pilot-scale treatability test and interim remedial measure treatment system between August 1994 and July 1996 to assess the effectiveness of liquid-phase granular activated carbon carbon tetrachloride removal. The pilot-scale treatability test's removal efficiently was determined to be 99.96% for carbon tetrachloride, chloroform, and trichloroethylene. This report summarizes and evaluates treatment, hydraulic, and hydrochemistry data collected for the 200-ZP-1 interim remedial measure from August through September 1996

  5. ISOE EG-SAM interim report - Report on behalf of the Sub expert Group

    International Nuclear Information System (INIS)

    Harris, Willie; Miller, David W.; Djeffal, Salah; Anderson, Ellen; Couasnon, Olivier; Hagemeyer, Derek; Sovijarvi, Jukka; Amaral, Marcos A.; Tarzia, J.P.; Schmidt, Claudia; Fritioff, Karin; Kaulard, Joerg; Lance, Benoit; Fritioff, Karin; Schieber, Caroline; Hayashida, Yoshihisa; Doty, Rick

    2014-01-01

    During its November 2012 meeting, the expert group decided to develop an interim (preliminary) report before the end of 2013 (with a general perspective and discussion of specific severe accident management worker dose issues), and to finalize the report by organizing the international workshop of 2014 to address national experiences, which will be incorporated to the report. The work of the EG-SAM focuses on radiation protection management and organization, radiation protection training and exercises related to severe accident management, facility configuration and readiness, worker protection, radioactive materials, contamination controls and logistics and key lessons learned especially from the TMI, Chernobyl and Fukushima Dai-ichi accidents. This interim report was completed through intensive work of all Group members nominated by the ISOE, and was accomplished during EG-SAM meetings through 2012-2013. This document gathers the different presentations given by the sub expert groups in charge of each chapter of the report

  6. Seismic Safety Margins Research Program. Phase I. Interim definition of terms

    International Nuclear Information System (INIS)

    Smith, P.D.; Dong, R.G.

    1980-01-01

    This report documents interim definitions of terms in the Seismic Safety Margins Research Program (SSMRP). Intent is to establish a common-based terminology integral to the probabilistic methods that predict more realistically the behavior of nuclear power plants during an earthquake. These definitions are a response to a request by the Nuclear Regulatory Commission Advisory Committee on Reactor Safeguards at its meeting held November 15-16, 1979

  7. Re-use of pilot data and interim analysis of pivotal data in MRMC studies: a simulation study

    Science.gov (United States)

    Chen, Weijie; Samuelson, Frank; Sahiner, Berkman; Petrick, Nicholas

    2017-03-01

    Novel medical imaging devices are often evaluated with multi-reader multi-case (MRMC) studies in which radiologists read images of patient cases for a specified clinical task (e.g., cancer detection). A pilot study is often used to measure the effect size and variance parameters that are necessary for sizing a pivotal study (including sizing readers, non-diseased and diseased cases). Due to the practical difficulty of collecting patient cases or recruiting clinical readers, some investigators attempt to include the pilot data as part of their pivotal study. In other situations, some investigators attempt to perform an interim analysis of their pivotal study data based upon which the sample sizes may be re-estimated. Re-use of the pilot data or interim analyses of the pivotal data may inflate the type I error of the pivotal study. In this work, we use the Roe and Metz model to simulate MRMC data under the null hypothesis (i.e., two devices have equal diagnostic performance) and investigate the type I error rate for several practical designs involving re-use of pilot data or interim analysis of pivotal data. Our preliminary simulation results indicate that, under the simulation conditions we investigated, the inflation of type I error is none or only marginal for some design strategies (e.g., re-use of patient data without re-using readers, and size re-estimation without using the effect-size estimated in the interim analysis). Upon further verifications, these are potentially useful design methods in that they may help make a study less burdensome and have a better chance to succeed without substantial loss of the statistical rigor.

  8. Preparation for tritiated waste management of fusion facilities: Interim storage WAC

    Energy Technology Data Exchange (ETDEWEB)

    Decanis, C., E-mail: christelle.decanis@cea.fr [CEA, DEN, Centre de Cadarache, F-13108 Saint-Paul-lez-Durance (France); Canas, D. [CEA, DEN/DADN, Centre de Saclay, F-91191 Gif-sur-Yvette cedex (France); Derasse, F. [CEA, DEN, Centre de Cadarache, F-13108 Saint-Paul-lez-Durance (France); Pamela, J. [CEA, Agence ITER-France, F-13108 Saint-Paul-lez-Durance (France)

    2016-11-01

    Highlights: • Fusion devices including ITER will generate tritiated waste. • Interim storage is the reference solution offering an answer for all types of tritiated radwaste. • Interim storage is a buffer function in the process management and definition of the waste acceptance criteria (WAC) is a key milestone in the facility development cycle. • Defining WAC is a relevant way to identify ahead of time the studies to be launched and the required actions to converge on a detailed design for example material specific studies, required treatment, interfaces management, modelling and monitoring studies. - Abstract: Considering the high mobility of tritium through the package in which it is contained, the new 50-year storage concepts proposed by the French Alternative Energies and Atomic Energy Commission (CEA) currently provide a solution adapted to the management of waste with tritium concentrations higher than the accepted limits in the disposals. The 50-year intermediate storage corresponds to 4 tritium radioactive periods i.e., a tritium reduction by a factor 16. This paper details the approach implemented to define the waste acceptance criteria (WAC) for an interim storage facility that not only takes into account the specificity of tritium provided by the reference scheme for the management of tritiated waste in France, but also the producers’ needs, the safety analysis of the facility and Andra’s disposal requirements. This will lead to define a set of waste specifications that describe the generic criteria such as acceptable waste forms, general principles and specific issues, e.g. conditioning, radioactive content, tritium content, waste tracking system, and quality control. This approach is also a way to check in advance, during the design phase of the waste treatment chain, how the future waste could be integrated into the overall waste management routes and identify possible key points that need further investigations (design changes, selection

  9. LES VARIANTES LEXICALES POUR LE MOT ESPADRILLES AU PARANÁ ET DANS LA RÉGION NORD-EST DU BRÉSIL: UNE ETUDE ETHNOLINGUISTIQUE

    Directory of Open Access Journals (Sweden)

    Maranúbia Pereira Barbosa Doiron

    2014-03-01

    Full Text Available : Cette étude concerne les variantes lexicales pour le mot espadrilles dans l’Etat du Paraná et dans la région Nord-Est du Brésil, sous un regard ethnolinguistique. Le corpus est composé par les donnés obtenues à partir de la question numéro 276 du Questionnaire Semantique-Lexical de l’Atlas Linguistique du Paraná (ALPR, dont l’auteur est le professeur Vanderci de Andrade Aguilera (1994, de l’Université de l’Etat de Londrina, autant que les variantes lexicales pour le mot espadrilles trouvées dans deux ouvrages littéraires d’auteurs originaires du Nord-Est du Brésil – Fogo Morto, de José Lins do Rego (2009 et Vidas Secas, de Graciliano Ramos (1969. Dans ces livres, les espadrilles jouent un rôle fondamental, tout en reflétant son importance dans le vestiaire de cette région, du moins jusqu’à moitié du XXème siècle. On rechercha des éventuelles ressemblances ou différences existentes entre les variantes lexicales de la chaussure mentionnée par les informateurs “paranaenses” et le modèle cité dans les ouvrages des écrivains Rego et Ramos. Dans les deuxs sources – la linguistique et la littéraire – on privilégia l’analyse semantique des unités lexicales et le contexte dans lequel elles ont été enregistrées. L’étude démontra que l’unité lexicale espadrilles et ses variantes phonétiques similaires dans les deux corpora, aussi que les variantes lexicales populaires présentes dans l’Atlas Linguistique du Paraná (ALPR. En dépit des simitudes l’esthétique et la fonction des espadrilles ne sont pas les mêmes dans les localitées concernées.

  10. LES VARIANTES LEXICALES POUR LE MOT ESPADRILLES AU PARANÁ ET DANS LA RÉGION NORD-EST DU BRÉSIL: UNE ETUDE ETHNOLINGUISTIQUE

    Directory of Open Access Journals (Sweden)

    Vanderci de Andrade AGUILERA

    2013-12-01

    Full Text Available Cette étude concerne les variantes lexicales pour le mot espadrilles dans l’Etat du Paraná et dans la région Nord-Est du Brésil, sous un regard ethnolinguistique. Le corpus est composé par les donnés obtenues à partir de la question numéro 276 du Questionnaire Semantique-Lexical de l’Atlas Linguistique du Paraná (ALPR, dont l’auteur est le professeur Vanderci de Andrade Aguilera (1994, de l’Université de l’Etat de Londrina, autant que les variantes lexicales pour le mot espadrilles trouvées dans deux ouvrages littéraires d’auteurs originaires du Nord-Est du Brésil – Fogo Morto, de José Lins do Rego (2009 et Vidas Secas, de Graciliano Ramos (1969. Dans ces livres, les espadrilles jouent un rôle fondamental, tout en reflétant son importance dans le vestiaire de cette région, du moins jusqu’à moitié du XXème siècle. On rechercha des éventuelles ressemblances ou différences existentes entre les variantes lexicales de la chaussure mentionnée par les informateurs “paranaenses” et le modèle cité dans les ouvrages des écrivains Rego et Ramos. Dans les deuxs sources – la linguistique et la littéraire – on privilégia l’analyse semantique des unités lexicales et le contexte dans lequel elles ont été enregistrées. L’étude démontra que l’unité lexicale espadrilles et ses variantes phonétiques similaires dans les deux corpora, aussi que les variantes lexicales populaires présentes dans l’Atlas Linguistique du Paraná (ALPR. En dépit des simitudes l’esthétique et la fonction des espadrilles ne sont pas les mêmes dans les localitées concernées.

  11. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  12. Interim Guidance for the Sanitary Control and Surveillance of Field Water Supplies

    Science.gov (United States)

    2005-07-15

    on field water site/area restoration , including the removal and disposal of waste (see chapter 11 and FM 4-02.17). CHAPTER 3 INTRODUCTION TO...chemical addition, coagulation, sedimentation, and various kinds of filtration including multimedia filtration, cartridge filtration, microfiltration ... microfiltration membrane-based pretreatment system. Interim Guidance Pending Publication of TBMED 577 15 July 2005 53 Figure 9-1

  13. Interim report on the TMI-2 purification filter examination

    International Nuclear Information System (INIS)

    Mason, R.E.; Hobbins, R.R.; Cook, B.A.; MacDonald, P.E.

    1983-02-01

    Filters from the purification/makeup system of the Three Mile Island Unit 2 Reactor were examined after the March 28, 1979, accident to determine the character of the debris transported to the filters. The general condition of the filters is presented. Material was removed from the filters and examined. The elemental and radionuclide makeup of the debris is discussed. Distribution of particle size and shape is presentd for some of the material examined. This is an interim report. When the investigation is completed, another report summarizing all of the data will be issued

  14. T Tank Farm Interim Cover Test - Design Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.

    2006-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  15. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    International Nuclear Information System (INIS)

    L. V. Street

    2007-01-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility

  16. 75 FR 30372 - Foreign-Trade Zone 196 Temporary/Interim Manufacturing Authority ATC Logistics & Electronics...

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket T-2-2010] Foreign-Trade Zone 196 Temporary/Interim Manufacturing Authority ATC Logistics & Electronics (Cell Phone Kitting and Distribution... filed an application submitted by the ATC Logistics & Electronics, operator of Site 2, FTZ 196...

  17. Prognostic value of interim FDG-PET in Hodgkin lymphoma : systematic review and meta-analysis

    NARCIS (Netherlands)

    Adams, Hugo J A; Nievelstein, Rutger A J; Kwee, Thomas C.

    2015-01-01

    This study aimed to systematically review and meta-analyse the value of interim (18) F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in predicting treatment failure in Hodgkin lymphoma. MEDLINE was systematically searched for original studies that used standardized international

  18. Prognostic value of negative interim 2-["1"8F]-fluoro-2-deoxy-D-glucose PET/CT in diffuse large B-cell lymphoma

    International Nuclear Information System (INIS)

    Kwon, S.H.; Kang, D.R.; Kim, J.; Yoon, J.-K.; Lee, S.J.; Jeong, S.H.; Lee, H.W.; An, Y.-S.

    2016-01-01

    Aim: To assess the prognostic value of negative interim combined 2-["1"8F]-fluoro-2-deoxy-D-glucose ("1"8F-FDG) positron-emission tomography/computed tomography (PET/CT) in patients with diffuse large B-cell lymphoma (DLBCL). Materials and methods: Ninety-two patients with histologically proven DLBCL were enrolled. All of the patients underwent "1"8F-FDG PET/CT at diagnosis, and interim PET/CT after the second cycle of chemotherapy with rituximab, cyclophosphamide, hydroxydaunorubicin, vincristine, and prednisolone (R-CHOP). Negative interim PET/CT was defined as the disappearance of all abnormal "1"8F-FDG uptake compared to the pretreatment PET/CT image, as determined by visual assessment. The clinical outcome of patients was estimated as progression-free survival (PFS), and the prognostic significance of clinicopathological and imaging parameters were assessed using the Cox proportional hazards model. Results: Thirty-six patients (39.1%) showed lymphoma progression within a median follow-up of 30.8 months. According to univariate analysis, Ann Arbor stage, serum lactate dehydrogenase level, Eastern Cooperative Oncology Group scale, International Prognostic Index (IPI) score, and maximum standardised uptake values on initial PET/CT were significant prognostic factors for PFS (all p<0.05). Among these parameters, only the IPI score was an independent predictor for PFS (p=0.044). Survival of patients with a high IPI score (≥3) was poorer than those with a low IPI score (0–2; p<0.001). Conclusion: Despite a negative interim "1"8F-FDG PET/CT, approximately 39% of DLBCL patients showed progression during follow-up. Although the negative PET/CT was obtained during chemotherapy, it is important to closely follow-up patients, especially those with a high IPI score. - Highlights: • About 39% of patients showed progression after negative interim PET/CT. • The IPI score was an independent predictor for PFS. • It is important to closely follow-up with high IPI score

  19. Conduct of the Persian Gulf Conflict: An Interim Report to Congress

    Science.gov (United States)

    1991-07-01

    a danger that we will assume that this war is a paradigm for the next, that subconsciously we’ll presume all future wars can be relatively pain free...CENTCOM. The experience elicited arecmmndtin o hagethe threshold for reprogram - JSTARS was an integral part of the system used to recommendation to...This Includes the realignment, reprogramming , or transfer of funds appropriated for activities unrelated to the Persian Gulf conflict. Interim Report

  20. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  1. Continuous solvent extraction feed adjustment for HTGR fuel reprocessing. Interim development report

    International Nuclear Information System (INIS)

    Olguin, L.J.

    1978-06-01

    The two-cycle Acid-Thorex solvent extraction process requires that the feed stream to each thorium cycle be processed to reduce its nitric acid concentration (feed adjustment). This interim development report presents the results of bench-scale and pilot-plant-scale feed adjustment experiments using a continuous mode of operation. An examination of formic acid denitration and fluoride ion volatilization is also included

  2. 40 CFR 265.383 - Interim status thermal treatment devices burning particular hazardous waste.

    Science.gov (United States)

    2010-07-01

    ... status thermal treatment devices burning particular hazardous waste. (a) Owners or operators of thermal treatment devices subject to this subpart may burn EPA Hazardous Wastes FO20, FO21, FO22, FO23, FO26, or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Interim status thermal treatment...

  3. Frequency and Type of Prosthetic Complications Associated with Interim, Immediately Loaded Full-Arch Prostheses: A 2-Year Retrospective Chart Review.

    Science.gov (United States)

    Drago, Carl

    2016-08-01

    The purpose of this report was to retrospectively evaluate implant and immediate full-arch prosthesis survival rates over a 24-month period; patients were consecutively treated with immediate occlusal loading. Dental arch, gender, and implant orientation (vertical vs. tilted) were also noted. All Brånemark System implants (Nobel Active) and interim, all-acrylic resin prostheses placed in patients following an All-on-Four™ protocol, in a single private practice were assessed by retrospective patient chart review. The amount of space provided surgically for implant restorative components and prostheses was determined from measurements of the vertical heights of the interim prostheses in the right/left anterior and posterior segments. These measurements were made in the laboratory. Interim prosthetic repairs (type, frequency, length of time from insertion) were analyzed by type, arch, gender, and implant orientation. Implant survival and insertion torque values were also measured. Inclusion criteria consisted of all Brånemark System implants placed with the All-on-Four protocol from September 1, 2011, until August 31, 2013. Specific dietary instructions were given for the first 7 days immediately postoperatively and for the weeks prior to insertion of the definitive prostheses. One hundred twenty-nine patients, comprising 191 arches (766 implants) from September 1, 2011, until August 31, 2013, were included in the study. One patient experienced implant failure yielding an overall implant survival rate (SR) of 99.5% (762 of 766). Four hundred twenty-six of 430 maxillary implants and 336 of 336 mandibular implants survived for SRs of 99.1% and 100%, respectively. Regarding implant orientation, 415 of 417 tilted implants (SR 99.5%) and 343 of 345 (CSR 95.6%) vertical implants were noted to be clinically stable. Interim, all-acrylic resin prostheses were in place for a mean of 199.2 days; mandibular prostheses were in place for an average of 195.4 days; maxillary

  4. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  5. Ferrié Jean-Noël et Santucci Jean-Claude (dir., Dispositifs de démocratisation et dispositifs autoritaires en Afrique du Nord, CNRS Editions, 2006, 196 p.

    Directory of Open Access Journals (Sweden)

    Lahouari Addi

    2009-05-01

    Full Text Available Voici un ouvrage de science politique des États Nord Africains dense, cohérent et remarquablement homogène, compte-tenu de son caractère collectif. Composé de sept contributions couvrant le Maroc, l’Algérie, la Tunisie et l’Egypte, il débute sur une substantielle introduction, où les coordinateurs esquissent le cadre théorique de la construction de l’objet de la science politique dans cette région. Ils évoquent avec raison les analyses produites par le CRESM (Centre de recherches et d’études ...

  6. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  7. Advantages on dry interim storage for spent nuclear fuel

    International Nuclear Information System (INIS)

    Romanato, L.S.; Rzyski, B.M.

    2006-01-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  8. Engineering study: disposition of terminal liquors for interim storage

    International Nuclear Information System (INIS)

    Metz, W.P.; Ogren, W.E.

    1975-02-01

    Eight alternative processes were chosen as being technologically feasible within the time frame dictated by budgeting procedures and terminal liquor availability. Solidified waste products acceptable for single-shell tank storage were assumed to be placed in available single-shell tanks. Double-shell tanks were used only for the more mobile terminal liquors or semi-solid mush products. The mush, chemical neutralization, and clay in-tank processes offer potential savings of tens of millions of dollars over double-shell tank storage of terminal liquors. In order to achieve this cost savings, the process development and demonstration must be completed prior to the beginning of double-shell tank construction (Dec. 1976) expected to be funded from a fiscal year 1977 line item. Budgeting for these additional double-shell tanks must proceed since the processing options discussed here are not yet available and may not prove to be available at the required time. This study indicates the following topics for additional study: Process technology development to achieve interim storage of terminal liquor products receives the greatest emphasis as a means of reducing capital expenditures. Interim storage product criteria, waste inventory, and conversion to final form require definition to allow comparison of the alternatives for disposition of terminal liquors. The pseudotechnical nature of product acceptability criteria is important to the evaluation of the partial neutralization and aluminum removal alternatives. More accurate estimates of terminal liquor quantity and composition are required to give a sound technical basis for choosing the appropriate processing alternative. Retrieval and reprocessing operations may affect the comparisons presented by this study

  9. Advantages on dry interim storage for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, L.S. [Centro Tecnologico da Marinha em Sao Paulo, Av. Professor Lineu Prestes 2468, 05508-900 Sao Paulo (Brazil); Rzyski, B.M. [IPEN/ CNEN-SP, 05508-000 Sao Paulo (Brazil)]. e-mail: romanato@ctmsp.mar.mil.br

    2006-07-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  10. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  11. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    RUNG, M.P.

    2000-01-01

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms

  12. 75 FR 35510 - License Renewal Interim Staff Guidance Process, Revision 2 Notice of Availability

    Science.gov (United States)

    2010-06-22

    ... Related Regulatory Functions.'' An electronic copy of the revised LR-ISG process is available in the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession No. ML100920158. The revised LR-ISG... interim changes to certain NRC license renewal guidance documents. These guidance documents facilitate the...

  13. Focus - Les établissements publics fonciers, des outils pour la biodiversité des zones humides : le cas de l’EPF Nord-Pas de Calais

    Directory of Open Access Journals (Sweden)

    LEMOINE, Guillaume

    2017-09-01

    Full Text Available Les établissements publics fonciers (EPF ont pour mission recycler le foncier dégradé pour favoriser, dans le cadre du développement durable, le renouvellement urbain, notamment pour aider la construction de logements tout en luttant contre l’étalement urbain. Devenus propriétaires de nombreux terrains, dont des zones humides, ils sont également concernés par la protection et la valorisation de ces espaces naturels. À travers l'exemple des actions menées par l’EPF Nord-Pas de Calais pour préserver ces zones humides, ce focus s'intéresse au rôle que peuvent jouer les EPF dans la préservation des espaces agricoles et naturels.

  14. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    Energy Technology Data Exchange (ETDEWEB)

    L. V. Street

    2007-04-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility.

  15. Glass-ionomer-silver-cermet interim Class I restorations for permanent teeth.

    Science.gov (United States)

    Croll, T P; Killian, C M

    1992-11-01

    Glass-ionomer-silver-cermet cement has proved to be a worthy alternative to silver amalgam for restoring certain Class I lesions in primary teeth. Such restorations are now known to last up to 8 years without need for repair or replacement. Cermet cement has also been used for interim restoration of permanent teeth in special cases, with ideal results. The procedure for placing a glass-ionomer-silver-cermet cement Class I restoration is described.

  16. Second interim assessment of the Canadian concept for nuclear fuel waste disposal. Volume 1

    International Nuclear Information System (INIS)

    Wuschke, D.M.; Gillespie, P.A.; Main, D.E.

    1985-07-01

    The nuclear fuel waste disposal concept chosen for development and assessment in Canada involves the isolation of corrosion-resistant containers of waste in a vault located deep in plutonic rock. As the concept and the assessment tools are developed, periodic assessments are performed to permit evaluation of the methodology and provide feedback to those developing the concept. The ultimate goal of these assessments is to predict what impact the disposal system would have on man and the environment if the concept were implemented. The second assessment was performed in 1984 and is documented in the Second Interim assessment of the Canadian Concept for Nuclear Fuel Waste Disposal Volumes 1 to 4. This volume, entitled Summary, is a condensation of Volumes 2, 3 and 4. It briefly describes the Canadian nuclear fuel waste disposal concept, and the methods and results of the second interim pre-closure and post-closure assessments of that concept. 46 refs

  17. International long-term interim storage for spent fuel. An independent storage service investor model

    International Nuclear Information System (INIS)

    Leister, P.

    1999-01-01

    Thinking globally the obvious world-wide demands for large storage capacities for spent fuel within the next decades and the newly arising demands for long-term interim storage of spent fuel urges to respond by international interim storage facilities of high capacity. Low cost storage can be achieved only by arranging the storage facility underground in a suitable host rock formation and by selecting the geographical are by an international competition under those countries, who are willing to offer their land. The investor and operator of an international storage facility selected and realised by a competition on the free market as well as the country where the storage is built are both bound by two different kinds of contacts. The main contract is between the offering country/region and the independent operator. The independent operator has in addition a series of contracts with various utilities, which are interested to have their spent fuel stored for a longer period

  18. Pre-conceptual study on the review framework for the radiation shielding safety of the PWR spent fuel cask interim storage in Korea

    International Nuclear Information System (INIS)

    Kim, Byeong-Soo; Jeong, Jae-Hak; Jeong, Chan-Woo

    2006-01-01

    In Korea, 20 nuclear power plants are in operation and lots of spent fuels are on the onsite storage. The onsite storage capacity in Korea is supposed to be full around at the year of 2016 and interim storage facilities could be considered to be constructed before 2016. A review framework to evaluate the radiation shielding safety of the interim storage facilities is developed in this study. It includes acceptance criteria, review procedures and activities of independent analyses. A case study is performed to apply the review framework. Modeling the review reference storage, evaluating the source terms and calculating the photon fluxes are performed. It is shown that the application of the review framework could satisfy the regulatory demand that would arise in the near future in the review area of the radiation shielding safety of the interim storage in Korea. (author)

  19. The regulating power market on the Nordic power exchange Nord Pool. An econometric analysis

    International Nuclear Information System (INIS)

    Skytte, K.

    1999-08-01

    What differentiates the structure of Nord Pool from other power exchanges around the world is the way the balance from the spot market is maintained until the actual, physical delivery takes place, via the regulating power market in Norway. This paper reveals the pattern of the prices on the regulating power market, by analysing the cost of being unable to fulfil the commitments made on the spot market. Some power producers with unpredictable fluctuations (e.g. wind) will need to buy regulation services. The disclosed pattern implies that these producers must pay a limited premium of readiness in addition to the spot price; this premium is independent of the amount of regulation. The level of the premium of readiness for down-regulation is shown to be strongly influenced by the level of the spot price. On the other hand, it is demonstrated that the premium for up-regulation is less correlated to the spot price. Furthermore, it is found that the amount of regulation affects the price of regulating power for up-regulation more strongly than it does for down-regulation. The disclosed cost of using the regulating power market is a quadratic function of the amount of regulation. This asymmetric cost may encourage bidders with fluctuating production to be more strategic in their way of bidding on the spot market. By using such strategies the extra costs (for example wind power) needed to counter unpredictable fluctuations may be limited. 12 refs

  20. Hitrex 1: an interim report on experimental and analytical work on BNL's zero power HTR

    Energy Technology Data Exchange (ETDEWEB)

    Beynon, A J; Kitching, S J; Lewis, T A; Waterson, R H

    1972-06-15

    This report presents interim experimental and theoretical results for the BNL Hitrex reactor. Reactivity effects and thermal and fast reaction rate distributions have been measured. Preliminary analysis has been performed, and some initial comparisons between theory and experiments made. (auth)

  1. Inventory of chemical releases of nuclear installations in the North-Cotentin; Inventaire des rejets chimiques des installations nucleaires du Nord-Cotentin

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-15

    The nuclear installations concerned by this study are Cogema La Hague, the Flamanville nuclear power plant, the Manche plant and the National Navy of Cherbourg.The objective followed by the ' source term ' work group has consisted in counting and examining the whole of existing measures relative to the releases of chemical substances in the liquid and gaseous effluents. Then because of the lack of measures for the operation first years of installations, the work group has estimated the order of magnitude of these chemical releases (essentially for Cogema La Hague). This report presents a review of the literature looking at the background levels of chemicals in different environmental compartments: air, soil, plants and animals products. these values have been summarized here to be available for comparisons with concentrations input by the North Cotentin nuclear installations, calculated by the G.R.N.C. (radioecology group of Nord Cotentin)

  2. Advanced nuclear reactor public opinion project. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  3. Alternatives generation and analysis report for immobilized low-level waste interim storage architecture

    Energy Technology Data Exchange (ETDEWEB)

    Burbank, D.A., Westinghouse Hanford

    1996-09-01

    The Immobilized Low-Level Waste Interim Storage subproject will provide storage capacity for immobilized low-level waste product sold to the U.S. Department of Energy by the privatization contractor. This report describes alternative Immobilized Low-Level Waste storage system architectures, evaluation criteria, and evaluation results to support the Immobilized Low-Level Waste storage system architecture selection decision process.

  4. Glass packages in interim storage; Les verres dans les stockages

    Energy Technology Data Exchange (ETDEWEB)

    Jacquet-Francillon, N

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO{sub 2}. The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ``source term`` models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs.

  5. Design, construction and commissioning of an interim spent fuel store for the decommissioning of Ignalina NPP, Lithuania

    International Nuclear Information System (INIS)

    Rainer Goehring; Martin Beverungen; Phil Smith

    2006-01-01

    The contract for the design, construction and commissioning (turn-key) of an interim spent fuel store facility (ISFSF) has been awarded to a Consortium of GNS Gesellschaft fuer Nuklear Service and RWE NUKEM GmbH under the lead of RWE NUKEM. The contract was signed on the 12.01.2005. The Interim Spent Fuel Storage Facility (ISFSF) is financed by the Ignalina Decommissioning Support Fund which is managed by EBRD. All spent fuel assemblies, currently stored in the spent fuel pits at the reactors plus future arising (about 18000 in total) will be loaded in the CONSTOR R RBMK1500/M2 containers, which are stored in the new facility. The initial contract has been awarded for 3500 spent fuel assemblies. (authors)

  6. Verification and validation interim report for portable 1,000 CFM exhauster skids POR-007/Skid E and POR-008/Skid F

    International Nuclear Information System (INIS)

    Nelson, O.D.

    1998-01-01

    This Verification and Validation (V/V) interim report summarizes to date the results of the V/V tasks performed in each of the following life cycle phases: concept, requirements, design, implementation, test, installation and checkout, and operation and maintenance. At the end of the installation and checkout phase, the V/V final report will be issued. This interim report contains or references the following for each phase: Description of V/V tasks performed; Summary of task results; Summary of anomalies and resolution; Assessment of system quality; Recommendations

  7. Estimation of the risk of radiation-induced leukaemia among young people in the vicinity of the La Hague reprocessing plant. Results from the nord-cotentin radioecological study

    International Nuclear Information System (INIS)

    Rommens, C.; Laurier, D.; Merle-Szeremeta, A.; Sugier, A.; Drombry-Ringeard, C.

    2000-01-01

    A radioecological study has been performed around the La-Hague nuclear reprocessing plant (Nord-Cotentin, France). The Working Group included nuclear operators, authorities, international experts and members of environmental organisations and was supported by IPSN. The study aimed to reconstruct radiation doses received by members of the public aged 0 to 24 years and living in the area, with a view to estimate the associated risk of leukaemia between 1978 and 1996. The assessment involved three steps: 1. reconstruction of a cohort of people aged 0 to 24 years, using local birth rates for the years 1954 to 1996 and taking into account the additional migrations of young people in the area. 2. estimation of doses to the red bone marrow received from all source of radiation (natural, medical, local nuclear industries and Chernobyl and weapons testing). Concentrations of radionuclides in the environment were estimated with a combination of two approaches: the modelling of the transfer of the releases in the environment and the use of environmental measurements. The dose computation takes into account the life style of the local population. ICRP dose coefficients to the red bone marrow were used. 3. derivation of leukaemia risk from a dose response model recommended by the UNSCEAR committee. The reconstructed population includes 6656 people born between 1954 and 1996, who inhabited the study area for at least one year between 1978 and 1996 before the age of 25. The number of person-years between 1978 and 1996 is 69308. The total collective dose to the red bone marrow due to local nuclear installations is 0.5 man.Sv. For the sake of comparison, the collective dose due to all sources of exposure is 241 man.Sv: The estimated number of leukaemia due to all exposure sources is 0.835. 74% are due to natural exposures, 24% to medical ones and 2% to the Chemobyl accident and nuclear arm testing. Nuclear facilities of Nord-Cotentin contribute only for 0.1% (between 0.0009 and 0

  8. The determination of the cesium distribution coefficient of the interim storage soil from Abadia de Goias, Go, Brazil

    International Nuclear Information System (INIS)

    Marumo, J.T.; Suarez, A.A.

    1989-01-01

    In September, 1987, an unauthorized removal of a cesium-therapy unit and its violation caused an accident, where several places of Goiania's city, capital of Goias, Brazil, were contaminated. The removal of the radioactive wastes generated from decontamination process, was made to Abadia de Goias city (near Goiania), where an interim storage was constructed. Soil samples collected from the 57th Street (Goiania) and from the interim storage permitted to determine, through static method, the cesium distribution coefficient for different cesium solution concentrations. Those results allows for some migration/retention evaluations in disposal site selection. Some soils parameters (water content, density, granulometric analysis, etc) as well as clay minerals constituents were also determined. (author) [pt

  9. CMS Interim Memorandum of Understanding The Costs and How They are Calculated

    CERN Document Server

    Willers, Ian Malcolm

    2001-01-01

    This document explains how we arrived at the costs that are to be used in the Interim Memorandum of Understanding, iMoU. It integrates information taken from the Hoffmann review, PASTA and Lucas Taylor. I would like to thank Petr Moissenz for proof reading which helped me to improve the accuracy of the information in a short period of time. Also Claude Charlot for his valuable comments.

  10. Comprehensive Medical Management of Rosacea: An Interim Study Report and Literature Review

    OpenAIRE

    Del Rosso, James Q.; Baum, Eric W.

    2008-01-01

    Rosacea is a common inflammatory facial dermatosis seen in adults that exhibits considerable variety in clinical presentation. Multiple medical therapeutic options are available including topical and oral treatments. Optimal medical management of rosacea includes assessment of subtype and disease severity and use of appropriate skin care to reduce epidermal barrier dysfunction. This article provides an overall discussion of the medical management of rosacea and reviews interim results from a ...

  11. Interim data quality objectives for waste pretreatment and vitrification. Revision 1

    International Nuclear Information System (INIS)

    Kupfer, M.J.; Conner, J.M.; Kirkbride, R.A.; Mobley, J.R.

    1994-01-01

    The Tank Waste Remediation System (TWRS) is responsible for storing, processing, and immobilizing the Hanford Site tank wastes. Characterization information on the tank wastes is needed so that safety concerns can be addressed, and retrieval, pretreatment, and immobilization processes can be designed, permitted, and implemented. This document describes the near-term tank waste sampling and characterization needs of the Pretreatment, High-Level Waste (HLW) Disposal, and Low-Level Waste (LLW) Disposal Programs to support the TWRS disposal mission. The final DQO (Data Quality Objective) will define specific waste tanks to be sampled, sample timing requirements, an appropriate analytical scheme, and a list of required analytes. This interim DQO, however, focuses primarily on the required analytes since the tanks to be sampled in FY 1994 and early FY 1995 are being driven most heavily by other considerations, particularly safety. The major objective of this Interim DQO is to provide guidance for tank waste characterization requirements for samples taken before completion of the final DQO. The characterization data needs defined herein will support the final DQO to help perform the following: Support the TWRS technical strategy by identification of the chemical and physical composition of the waste in the tanks and Guide development efforts to define waste pretreatment processes, which will in turn define HLW and LLW feed to vitrification processes

  12. Symptomatic treatment in multiple sclerosis-interim analysis of a nationwide registry.

    Science.gov (United States)

    Skierlo, S; Rommer, P S; Zettl, U K

    2017-04-01

    To analyze symptomatic treatment in patients with multiple sclerosis (MS). Multiple sclerosis is a chronic inflammatory disease of the central nervous system, with accumulating disability symptoms like spasticity, voiding disorders, depression, and pain might occur. The nationwide German MS registry was initiated 2001 under guidance of the German MS society (Deutsche MS Gesellschaft). This study was performed as an interim analysis to lay foundation for future work on this topic. A subcohort of 5113 patients was assessed for this interim analysis. The mean age of the patients was 45.3 years; mean EDSS was 4.2. More than two-third of the enrolled patients were females (70.9%). Most frequent symptoms were fatigue (60%), followed by spasticity (52.5%) and voiding disorders (51.7%). The likelihood of treatment was highest for epileptic disorders (68.8%), spasticity (68.5%), pain (60.7%), and depression (58.9%). Multivariate regression analysis showed that retirement was the strongest factor predictive for antispastic treatment (β=.061, P=.005). Almost all patients in this analysis suffer from symptoms due to advanced MS. Treatment for the various symptoms differed tremendously. The likelihood of treatment correlated with the availability of effective therapeutic agents. Clinicians should put more awareness on MS symptoms. Symptomatic treatment may improve quality of life. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  13. Analysis of removal of residual decay heat from interim storage facilities by means of the CFD program FLUENT

    International Nuclear Information System (INIS)

    Stratmann, W.; Hages, P.

    2004-01-01

    Within the scope of nuclear licensing procedures of on-site interim storage facilities for dual purpose casks it is necessary, among other things, to provide proof of sufficient removal of the residual decay heat emitted by the casks. The results of the analyses performed for this purpose define e.g. the boundary conditions for further thermal analyses regarding the permissible cask component temperatures or the maximum permissible temperatures of the fuel cladding tubes of the fuel elements stored in the casks. Up to now, for the centralized interim storage facilities in Germany such analyses were performed on the basis of experimental investigations using scaled-down storage geometries. In the engineering phase of the Lingen on-site interim storage facility, proof was furnished for the first time using the CFD (computational fluid dynamics) program FLUENT. The program FLUENT is an internationally recognized and comprehensively verified program for the calculation of flow and heat transport processes. Starting from a brief discussion of modeling and the different boundary conditions of the computation, this contribution presents various results regarding the temperatures of air, cask surfaces and storage facility components, the mass flows through the storage facility and the heat transfer at the cask surface. The interface point to the cask-specific analyses is defined to be the cask surface

  14. Evaluation of internal fit of interim crown fabricated with CAD/CAM milling and 3D printing system.

    Science.gov (United States)

    Lee, Wan-Sun; Lee, Du-Hyeong; Lee, Kyu-Bok

    2017-08-01

    This study is to evaluate the internal fit of the crown manufactured by CAD/CAM milling method and 3D printing method. The master model was fabricated with stainless steel by using CNC machine and the work model was created from the vinyl-polysiloxane impression. After scanning the working model, the design software is used to design the crown. The saved STL file is used on the CAD/CAM milling method and two types of 3D printing method to produce 10 interim crowns per group. Internal discrepancy measurement uses the silicon replica method and the measured data are analyzed with One-way ANOVA to verify the statistic significance. The discrepancy means (standard deviation) of the 3 groups are 171.6 (97.4) µm for the crown manufactured by the milling system and 149.1 (65.9) and 91.1 (36.4) µm, respectively, for the crowns manufactured with the two types of 3D printing system. There was a statistically significant difference and the 3D printing system group showed more outstanding value than the milling system group. The marginal and internal fit of the interim restoration has more outstanding 3D printing method than the CAD/CAM milling method. Therefore, the 3D printing method is considered as applicable for not only the interim restoration production, but also in the dental prosthesis production with a higher level of completion.

  15. Prosthetic rehabilitation of the dentate maxillectomy patient from a delayed surgical to an interim obturator: A clinical case report

    Directory of Open Access Journals (Sweden)

    Angleena Y Daniel

    2015-01-01

    Full Text Available The surgical management of maxillary pathosis results in direct communication between the oral and nasal cavity, imposing problems such as nasal regurgitation, unintelligent speech, difficulty in deglutition and compromised esthetics. A restoration of these defects is not always possible surgically, but prosthetic rehabilitation is an established treatment modality. Early rehabilitation can improve the quality of life and reduce the psychological trauma caused by surgical excision. Surgical and interim obturators placed during the initial phase can improve the outcome of the definitive prosthesis. This article presents a case report of a patient with partial maxillectomy who has been rehabilitated with a delayed surgical and an interim obturator.

  16. Interim storage of spent fuel elements in the Paks Nuclear Power Plant, Hungary

    International Nuclear Information System (INIS)

    Szabo, B.

    1998-01-01

    The interim storage of spent fuel cassettes of the Paks NPP provides storage for 50 years at the Paks NPP site. The modular dry storage technology is presented. The technological design and the licensing of the facility has been made by the GEC Alsthom ESL firm. This storage facility can accommodate 450 fuel cassettes until their final disposal. (R.P.)

  17. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    Science.gov (United States)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  18. Nondestructive evaluation of creep-fatigue damage: an interim report

    International Nuclear Information System (INIS)

    Nickell, R.E.

    1977-02-01

    In view of the uncertainties involved in designing against creep-fatigue failure and the consequences of such failures in Class 1 nuclear components that operate at elevated temperature, the possibility of intermittent or even continuous non-destructive examination of these components has been considered. In this interim report some preliminary results on magnetic force and ultrasonic evaluation of creep-fatigue damage in an LMFBR steam generator material are presented. These results indicate that the non-destructive evaluation of pure creep damage will be extremely difficult. A set of biaxial creep-fatigue tests that are designed to discriminate between various failure theories is also described

  19. Policy-based Network Management in Home Area Networks: Interim Test Results

    OpenAIRE

    Ibrahim Rana, Annie; Ó Foghlú, Mícheál

    2009-01-01

    This paper argues that Home Area Networks (HANs) are a good candidate for advanced network management automation techniques, such as Policy-Based Network Management (PBNM). What is proposed is a simple use of policy based network management to introduce some level of Quality of Service (QoS) and Security management in the HAN, whilst hiding this complexity from the home user. In this paper we have presented the interim test results of our research experiments (based on a scenario) using the H...

  20. Using optimization to improve radioactive waste interim storage

    International Nuclear Information System (INIS)

    Dellamano, J.C.; Sordi, G.M.

    2006-01-01

    In several countries where repository for final disposal is not constructed and in operation, the low level radioactive wastes are treated and stored. In some cases, interim storage can be extended for decades demanding special attention regarding security aspects. On the other hand, some packages contains very small quantities of radioactive material either by the long period of storage or by the rudimental segregation carried out when the radioactive waste were collected. This paper discuss the use of cost-benefit analysis as technique to aid decision making in order to evaluate the feasibility of to open the packages containing compactable solid radioactive wastes and to segregate these waste according to the classification that consider the recent clearance levels and exemption limits recommended by international organisms. (authors)