WorldWideScience

Sample records for winter maintenance program

  1. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  2. Prevalence of operator fatigue in winter maintenance operations.

    Science.gov (United States)

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  3. The U.S. Federal Highway Administration winter Maintenance Decision Support System (MDSS) project

    Energy Technology Data Exchange (ETDEWEB)

    Pisano, P.A. [Federal Highway Administration, Road Weather Managment Program, Washington, D.C. (United States); Stern, A.D. [Mitretek Systems, Inc., Oceanic, Atmospheric and Space Systems, Falls Church, VA (United States); Mahoney, W.P. [National Center for Atmospheric Research, Research Applications Program, Boulder, CO (United States)

    2004-07-01

    Managing a winter maintenance program today is an increasingly complex endeavor. Just making sure that a plow blade is at the ready when the first flake falls is only a small part of the task. With tight budgets and the high expectation of the public for keeping roads clear of snow and ice, today's maintenance manager has to be able to handle multiple tasks or risk getting behind the onslaught of winter weather. Good information leads to effective practices, however all of the regulations concerning chemical applications, environmental impacts and multiple, often contradictory weather forecasts can lead to information overload. The United States Department of Transportation (DOT), Federal Highway Administration (FHWA) recognized this potential problem in the late 1990's as part of its Road Weather Management (RWM) program. Generally speaking, there were plenty of weather forecasts, along with a few companies that issued road-specific forecasts, but there was a lack of linkage between the information available and the decisions made by winter maintenance managers. It was this weak link that became the genesis for the winter Maintenance Decision Support System (MDSS). The MDSS has since matured into a functional prototype. During the winter of 2002-2003, the prototype was deployed at several maintenance garages in central Iowa for a field demonstration. This paper will document the implementation of the demonstration, a summary of lessons learned, and technology transfer activities. It will also describe plans for a longer, more comprehensive demonstration during the winter of 2003-2004. (orig.)

  4. AUTOMATIC CONTROL SYSTEM OF WINTER AUTOMOBILE-ROAD MAINTENANCE

    Directory of Open Access Journals (Sweden)

    I. I. Leonovich

    2008-01-01

    Full Text Available In order to ensure a rational usage of financial and material resources directed on winter automobile-road maintenance in theRepublicofBelarusan automatic control system of winter maintenance is under its development and introduction.  The main purpose of the system is to obtain and use meteorological information on the state of a road network that allows to take necessary organizational and technological solutions ensuring safety and continuity of traffic during winter. This system also presupposes to ensure constant control over the state of roadway covering, expenditure of anti-glazed frost materials at all levels of management.The paper considers main aspects pertaining to introduction of the automatic control system of winter maintenance

  5. Payment mechanisms for winter road maintenance services

    Directory of Open Access Journals (Sweden)

    Adel Abdi

    2013-12-01

    Full Text Available In countries with severe winters a major part of the annual budget for road maintenance is allocated on performance of winter road maintenance tasks. Finding appropriate remuneration forms to compensate entrepreneurs for performed road measures during winter is not an easy task in order to minimise or eliminate disputes and satisfy both client organisations and contractors. On the other hand improper reimbursement models lead either to the client’s annual budget imbalance due to unnecessary cost overruns or affect contractor’s cash-flow. Such cases in turn affect just-in-time winter road maintenance and then traffic safety. To solve such problems, a number of countries in cold regions like Sweden have developed different remuneration models based more on weather data called Weather Index. Therefore the objective of this paper is to investigate and evaluate the payment models applied in Sweden. The study uses a number of approaches namely; domestic questionnaire survey, analysis of a number of contract documents, a series of meetings with the project managers and an international benchmarking. The study recognised four remuneration models for winter maintenance service of which one based on weather data statistics. The study reveals the payment model based on weather data statistics is only applied for the roads with higher traffic flow and the model generates most uncertainty.

  6. Advanced decision support for winter road maintenance

    Science.gov (United States)

    2008-01-01

    This document provides an overview of the Federal Highway Administration's winter Maintenance Decision Support System (MDSS). The MDSS is a decision support tool that has the ability to provide weather predictions focused toward the road surface. The...

  7. Winter Maintenance Wash-Water Heavy Metal Removal Pilot Scale Evaluation

    Directory of Open Access Journals (Sweden)

    Christopher M. Miller

    2016-01-01

    Full Text Available To encourage sustainable engineering practices, departments of transportation are interested in reusing winter maintenance truck wash water as part of their brine production and future road application. Traffic-related metals in the wash water, however, could limit this option. The objective of this work was to conduct a pilot scale evaluation of heavy metal (copper, zinc, iron, and lead removal in a filtration unit (maximum flow rate of 45 L/minute containing proprietary (MAR Systems Sorbster® media. Three different trials were conducted and approximately 10,000 L of wash water collected from a winter maintenance facility in Ohio was treated with the pilot unit. Lab studies were also performed on six wash-water samples from multiple facilities to assess particle size removal and estimate settling time as a potential removal mechanism during wash-water storage. Pilot unit total metal removal efficiencies were 79%, 77%, 63%, and 94% for copper, zinc, iron, and lead, respectively. Particle settling calculation estimates for copper and zinc show that 10 hours in storage can also effectively reduce heavy metal concentrations in winter maintenance wash water in excess of 70%. These pilot scale results show promise for reducing heavy metal concentrations to an acceptable level for reuse.

  8. Evaluation of the Viking-Cives towplow for winter maintenance.

    Science.gov (United States)

    2014-01-01

    To maximize efficiency while minimizing costs within ODOTs winter maintenance budget, ODOT is : evaluating new methods of snow and ice removal. One method is the use of the Viking-Cives TowPlow. The : TowPlow is pulled behind a tandem axle truck a...

  9. Guidelines to Facilitate the Evaluation of Brines for Winter Roadway Maintenance Operations.

    Science.gov (United States)

    2017-09-19

    This document presents guidelines to facilitate the evaluation of brines for winter weather roadway maintenance applications in Texas. Brines are used in anti-icing applications which typically consist of placing liquid snow and ice control chemicals...

  10. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  11. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  12. Tow plows could help Michigan save time and money on winter maintenance : research spotlight.

    Science.gov (United States)

    2016-11-01

    As winter maintenance costs rise, MDOT is looking into innovative approaches to increase snow removal efficiency. As part of this effort, the department recently estimated the costs and benefits of incorporating tow plows into its equipment fleet. Re...

  13. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  14. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  15. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  16. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  17. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    Morrison, J.F.

    1992-01-01

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  18. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  19. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  20. BWR Services maintenance training program

    International Nuclear Information System (INIS)

    Cox, J.H.; Chittenden, W.F.

    1979-01-01

    BWR Services has implemented a five-phase program to increase plant availability and capacity factor in operating BWR's. One phase of this program is establishing a maintenance training program on NSSS equipment; the scope encompasses maintenance on both mechanical equipment and electrical control and instrumentation equipment. The program utilizes actual product line equipment for practical Hands-on training. A total of 23 formal courses will be in place by the end of 1979. The General Electric Company is making a multimillion dollar investment in facilities to support this training. These facilities are described

  1. Probabilistic methods for maintenance program optimization

    International Nuclear Information System (INIS)

    Liming, J.K.; Smith, M.J.; Gekler, W.C.

    1989-01-01

    In today's regulatory and economic environments, it is more important than ever that managers, engineers, and plant staff join together in developing and implementing effective management plans for safety and economic risk. This need applied to both power generating stations and other process facilities. One of the most critical parts of these management plans is the development and continuous enhancement of a maintenance program that optimizes plant or facility safety and profitability. The ultimate objective is to maximize the potential for station or facility success, usually measured in terms of projected financial profitability, while meeting or exceeding meaningful and reasonable safety goals, usually measured in terms of projected damage or consequence frequencies. This paper describes the use of the latest concepts in developing and evaluating maintenance programs to achieve maintenance program optimization (MPO). These concepts are based on significant field experience gained through the integration and application of fundamentals developed for industry and Electric Power Research Institute (EPRI)-sponsored projects on preventive maintenance (PM) program development and reliability-centered maintenance (RCM)

  2. Elements of a total MOV maintenance program

    International Nuclear Information System (INIS)

    Lavallee, W.L.

    1989-01-01

    Establishing a good preventive and predictive maintenance program for motor-operated valves (MOVs) is an especially challenging task for nuclear power plants. Because of the sheer number of MOVs involved, all with somewhat different characteristics and requirements, and the extremely critical functions that some of the MOVs perform, the maintenance program quickly becomes a major exercise in coordination. This paper outlines a three-phase approach to achieving a comprehensive MOV maintenance program. It is based on experience in assisting nuclear plants with their MOV programs and encountering many of the pitfalls that can hamper these programs. The three phases include up-front engineering preparation, field diagnostic testing, and maintenance follow-up and trending. Each of these phases is discussed, and a flowchart describing the individual elements of each phase is provided

  3. Maintenance program decision-making utilizing crash data.

    Science.gov (United States)

    2013-07-01

    This document describes methods that may be used by UDOT Maintenance personnel to improve highway safety. Four programs have been recommended using crash data to make more informed decisions concerning maintenance programs as follows: : Snow & Ic...

  4. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  5. Exploratory Disposal and Reuse Feasibility Analysis of Winter Maintenance Wash Water.

    Science.gov (United States)

    Ullinger, Heather L; Kennedy, Marla J; Schneider, William H; Miller, Christopher M

    2016-01-01

    The Ohio Department of Transportation has more than 60 facilities without sewer access generating approximately 19 million gallons of winter maintenance wash water. Off-site disposal is costly, creating the need for sustainable management strategies. The objective of this study was to conduct an exploratory feasibility analysis to assess wash water disposal and potential reuse as brine. Based on a comprehensive literature review and relevant environmental chemistry, a sampling protocol consisting of 31 water quality constituents was utilized for monthly sampling at three geographically distinct Ohio Department of Transportation garages during the winter of 2012. Results were compared to local disposal and reuse guidance limits. Three constituents, including a maximum copper concentration of 858 ppb, exceeded disposal limits, and many constituents also failed to meet reuse limits. Some concentrations were orders of magnitude higher than reuse limits and suggest pre-treatment would be necessary if wash water were reused as brine. These water quality results, in conjunction with copper chemical equilibrium modeling, show pH and dissolved carbon both significantly impact the total dissolved copper concentration and should be measured to assess reuse potential. The sampling protocol and specific obstacles highlighted in this paper aid in the future development of sustainable wash water management strategies.

  6. Exploratory Disposal and Reuse Feasibility Analysis of Winter Maintenance Wash Water.

    Directory of Open Access Journals (Sweden)

    Heather L Ullinger

    Full Text Available The Ohio Department of Transportation has more than 60 facilities without sewer access generating approximately 19 million gallons of winter maintenance wash water. Off-site disposal is costly, creating the need for sustainable management strategies. The objective of this study was to conduct an exploratory feasibility analysis to assess wash water disposal and potential reuse as brine. Based on a comprehensive literature review and relevant environmental chemistry, a sampling protocol consisting of 31 water quality constituents was utilized for monthly sampling at three geographically distinct Ohio Department of Transportation garages during the winter of 2012. Results were compared to local disposal and reuse guidance limits. Three constituents, including a maximum copper concentration of 858 ppb, exceeded disposal limits, and many constituents also failed to meet reuse limits. Some concentrations were orders of magnitude higher than reuse limits and suggest pre-treatment would be necessary if wash water were reused as brine. These water quality results, in conjunction with copper chemical equilibrium modeling, show pH and dissolved carbon both significantly impact the total dissolved copper concentration and should be measured to assess reuse potential. The sampling protocol and specific obstacles highlighted in this paper aid in the future development of sustainable wash water management strategies.

  7. 25 CFR 170.804 - How is BIA's Road Maintenance Program related to the IRR Program?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is BIA's Road Maintenance Program related to the IRR... WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.804 How is BIA's Road Maintenance Program related to the IRR Program? The following chart illustrates how BIA's Road Maintenance Program is...

  8. New Role of Thermal Mapping in Winter Maintenance with Principal Components Analysis

    Directory of Open Access Journals (Sweden)

    Mario Marchetti

    2014-01-01

    Full Text Available Thermal mapping uses IR thermometry to measure road pavement temperature at a high resolution to identify and to map sections of the road network prone to ice occurrence. However, measurements are time-consuming and ultimately only provide a snapshot of road conditions at the time of the survey. As such, there is a need for surveys to be restricted to a series of specific climatic conditions during winter. Typically, five to six surveys are used, but it is questionable whether the full range of atmospheric conditions is adequately covered. This work investigates the role of statistics in adding value to thermal mapping data. Principal components analysis is used to interpolate between individual thermal mapping surveys to build a thermal map (or even a road surface temperature forecast, for a wider range of climatic conditions than that permitted by traditional surveys. The results indicate that when this approach is used, fewer thermal mapping surveys are actually required. Furthermore, comparisons with numerical models indicate that this approach could yield a suitable verification method for the spatial component of road weather forecasts—a key issue currently in winter road maintenance.

  9. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  10. After reliability centred maintenance. Preventive maintenance living program implementation at Bruce Power

    International Nuclear Information System (INIS)

    Harazim, Michael L.; Ferguson, Brian J.

    2003-01-01

    Industrial preventive maintenance (PM) programs represent a large part of plant O and M costs. PM Optimization (PMO) projects represent an effective mechanism for identifying unnecessary PM, extending PM intervals and infusing predictive maintenance (PdM) methods. However, once optimized, what process prevents the PM program from returning to a state of disarray? This is the function of a PM living program (PMLP). In 1997, an independent performance assessment identified concerns with the applicability and effectiveness of all Ontario Power Generation, Inc. (OPGI) PM programs. In response, OPGI instituted an Integrated Maintenance Program (IMP) including Reliability Centred Maintenance (RCM) and a PMLP. It should be noted that the PMLP was developed for the 3 OPGI nuclear Sites (i.e. Bruce, Pickering, and Darlington). Effective 1 May 2001, the Bruce Site has been leased to a group of investors lead by British Energy. This paper is written in historical context and therefore refers to the Bruce Site as part of OPGI. The PMLP is made up of five elements: 1) process control, 2) change control, 3) worker feedback, 4) program performance metrics, and 5) deferral module. A PMLP software tool, originally applied to Duke Energy nuclear plants, was enhanced and customized specifically for the OPGI PMLP, and then implemented at all three of OPGI's nuclear sites. The objective of the OPGI PMLP was to: Provide processes/procedures for continual optimization of all site PM tasks, Ensure effective and timely revision of PM tasks in the work management system, Ensure PM tasks remain applicable/effective at all times, Maintain and enhance PM consistency on a component, system and Site basis, Ensure that new predictive maintenance techniques are applied and integrated with the PM program, Ensure that mandated PM tasks are identified and executed, Provide a mechanism for craft feedback, Meet regulatory requirements for PM program effectiveness, and Provide PM task deferral

  11. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  12. Reliability centered Maintenance (RCM) program for Chashma NPP (CHASNUPP)

    International Nuclear Information System (INIS)

    Khalid, S.; Khan, S.A.

    2000-01-01

    This paper describes the proposed Reliability Centered Maintenance (RCM) program for Chashma Nuclear Power Plant (CHASNUPP). Major steps are the identification of risk critical components and the implementation of RCM procedures. Identification of risk critical components is based upon the CHASNUPP level 1 PSA results (performed under IAEA TC Project PAK/9/019) which is near completion. The other requirements for implementation of RCM program is the qualitative analysis to be performed for identifying the dominant potential failure modes of each risk critical component and determination of the necessary maintenance activities, required to ensure reliable operation of the identified risk critical components. Implementation of RCM program for these components will lead to improvement in plant availability and safety together with reduction in the maintenance cost. Development - implementation of RCM program at this stage will help the CHASNUPP Maintenance department who is now developing the maintenance program - procedures for CHASNUPP. (author)

  13. 25 CFR 170.801 - What is the BIA Road Maintenance Program?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the BIA Road Maintenance Program? 170.801 Section... ROADS PROGRAM BIA Road Maintenance § 170.801 What is the BIA Road Maintenance Program? The BIA Road... subpart contains a list of activities that are eligible for funding under the BIA road maintenance program. ...

  14. A winter severity index for the state of Maine.

    Science.gov (United States)

    2009-01-01

    Winter maintenance in the Sate of Maine consumes around twenty percent of the Bureau of : Maintenance and Operations budget each year. Costs are directly related to the length and severity : of a winter season. In addition, the cost of materials and ...

  15. 25 CFR 170.2 - What is the IRR Program and BIA Road Maintenance Program policy?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the IRR Program and BIA Road Maintenance Program... and BIA Road Maintenance Program policy? (a) It is the policy of the Secretary of the Interior and the... designed to enable Indian tribes to participate in all contractible IRR and BIA Road Maintenance programs...

  16. Building Maintenance. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary of Occupational Titles…

  17. Using systematic aging assessments to improve effectiveness of plant maintenance programs

    International Nuclear Information System (INIS)

    Watson, P.; Yang, J.X.; Dam, R.F.; Nickerson, J.H.

    2003-01-01

    Nuclear plant equipment aging assessment studies provided by AECL include life assessments, condition assessments or systematic assessments of maintenance. AECL has developed several tools to apply the results of aging assessment studies to improve the effectiveness of actual plant maintenance programs. The Systematic Assessment of Maintenance and the SYSTMS tool generate maintenance tasks for a system. The System Maintenance Datastore tool assesses the maintenance resources on a system basis, and can thus quantify the savings realized by optimizing the maintenance program. Long term trends in condition-based maintenance due to component aging can be predicted, and resource savings due to optimum timing of component replacement or general plant refurbishment can be quantified. The System based Adaptive Maintenance Process ensures the maintenance program is continually updated to reflect the latest plant equipment condition and maintenance strategy information. (author)

  18. Long-period maintenance program of JRR-3M

    International Nuclear Information System (INIS)

    Murayama, Yoji; Onozaki, Michio; Kakefuda, Kazuhiro

    1999-01-01

    The JRR-3M is a swimming pool type research reactor with maximum thermal output of 20 MW, classed in a large-scale research reactor and composed of numerous facilities. An operation cycle consists of 4 weeks of continuously reactor operation and 1 week of shutdown work such as fuel exchange and irradiation sample handling. The temporary and small-scale maintenance is also carried out during the shutdown period. Systematic maintenance period through a year usually follows 2 stages. The former stage of about 4 weeks is prepared to maintain the general facilities related to the overall reactor system such as computer system. The latter stage of about 9 weeks is prepared to maintain the other individual facilities such as cooling facilities and control facilities that are to be inspected by the regulatory body. Since preventive maintenance is required in order to achieve an improvement of safety, reliability and availability throughout the life cycle of the reactor, a long-period maintenance program should be prepared properly in consideration of an ageing degradation of the facilities. The long-period maintenance program of JRR-3M, which determines not only the replacement frequency but also the maintenance frequency of the facilities, is made on the basis of an ageing degradation of the facilities, irradiation effects of the materials, recommendations from the manufacturer and JRR-3M maintenance records. The replacement frequency recommended by the manufacturer is examined from the viewpoint of the safety significance of the facilities and availability of the components. The program is arranged so that it may not concentrate the replacement of the facilities in the specific fiscal year and smooth the budget and maintenance period throughout the life cycle of the reactor. There have been two unanticipated failures of the facilities, which required rearranging the program. (author)

  19. Program strategies for maintenance management, organization and planning

    International Nuclear Information System (INIS)

    Czegeny, J.I.

    2003-01-01

    In this paper we look respectively at three specific examples showing program strategies for maintenance management, organization and planning. Starting with preventive maintenance optimization, we will look at one Bruce B Predefined task on the Reactor Regulating System to illustrate reduced maintenance requirement, a maintenance management strategy. Next discussed is the organizational strategy at Darlington to have an engineering program meet the jurisdictional requirements for maintaining certification for TSSA registered pressure vessels. The last look-see will show the earned value of the planning for the first Pickering A unit to be returned to service. Finally all the above is tied together in a compare and contrast of what works and what could be improved upon. (author)

  20. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance

  1. Establishing a predictive maintenance program at the Hanford Site

    International Nuclear Information System (INIS)

    Winslow, R.W.

    1994-05-01

    This document contains information about a new Predictive Maintenance Program being developed and implemented at the Hanford Reservation. Details of the document include: background on persons developing the program, history of predictive maintenance, implementation of new program, engineering task analysis, network development and new software, issues to be resolved, benefits expected, and appendix gives information about the symposium from which this paper is based

  2. A study on maintenance rule program and its application at Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  3. A study on maintenance rule program and its application at Korean NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Kim, Kil Yoo; Kang, Dae Il; Yang, Joon Eon; Ha, Jae Joo

    2000-11-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project.

  4. 14 CFR 129.113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 129... Continued Airworthiness and Safety Improvements § 129.113 Fuel tank system maintenance program. (a) Except... on which an auxiliary fuel tank is installed under a field approval, before June 16, 2008, the...

  5. 14 CFR 121.1113 - Fuel tank system maintenance program.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fuel tank system maintenance program. 121... Improvements § 121.1113 Fuel tank system maintenance program. (a) Except as provided in paragraph (g) of this... capacity of 7500 pounds or more. (b) For each airplane on which an auxiliary fuel tank is installed under a...

  6. A comprehensive approach to RCM-based preventive maintenance program development

    International Nuclear Information System (INIS)

    Hall, B.E.; Davis, T.; Pennington, A.J.

    1988-01-01

    In late 1986, Public Service Electric and Gas Company (PSE ampersand G) concluded that to support its vision and strategic planning it would be necessary to develop a consistent approach to maintenance for all nuclear units at the artificial island. General Physics Corporation was selected to lead a consultant team to support full-scale development of a preventive maintenance (PM) program for Salem and Hope Creek generating stations based on a reliability-centered maintenance (RCM) approach. RCM was selected because it represents a systematic approach to developing a PM program that provides a logical, consistent, and traceable methodology and produces a well-documented engineering basis for the program. Early in 1987, primary objectives for the PM program were defined. The Phase I tasks addressed key programmatic areas such as maintenance philosophy, procedures, condition monitoring, performance trending, equipment failure data base, ogranization, PM program effectiveness evaluation, RCM process, reliability/availability modeling, information management, training, spare parts, software/hardware, and commitments. Phase I of the PM program development project was completed in January 1988. Highlights of the Phase I work and the PM program manual are described

  7. Method and computer program product for maintenance and modernization backlogging

    Science.gov (United States)

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  8. The International Coal Statistics Data Base program maintenance guide

    International Nuclear Information System (INIS)

    1991-06-01

    The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig

  9. Cost effectiveness of the MDOT preventive maintenance program.

    Science.gov (United States)

    2013-04-01

    The Michigan Department of Transportations (MDOT) pavement preservation program dates back to 1992. MDOTs pavement preservation strategy is primarily implemented through its capital preventive maintenance (CPM) program, in which preventive main...

  10. Laboratory services series: a master-slave manipulator maintenance program

    International Nuclear Information System (INIS)

    Jenness, R.G.; Hicks, R.E.; Wicker, C.D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance

  11. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Science.gov (United States)

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible for maintenance under the BIA Road Maintenance Program: (1) BIA transportation facilities listed in...

  12. National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fewell, N.

    1993-12-01

    The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

  13. Long-Term Weight Maintenance after a 17-Week Weight Loss Intervention with or without a One-Year Maintenance Program: A Randomized Controlled Trial

    Directory of Open Access Journals (Sweden)

    Tuula Pekkarinen

    2015-01-01

    Full Text Available Background. Weight lost by obese patients is almost always regained over time. Extended treatment may improve maintenance, but solid evidence is lacking. Purpose. We determined effectiveness of maintenance therapy after a weight loss program. Methods. Together 201 patients (mean age 47 years and BMI 42 kg/m2, 71% women were randomly assigned to either a 17-week weight loss program followed by a one-year maintenance program or to a weight loss program without subsequent maintenance intervention. The weight loss program included behavior modification and a very-low-calorie diet, and maintenance program behavior modification. The primary outcome measure was percentage of patients with 5% or more weight loss at the end of maintenance (week 69 and one year later (week 121. Secondary outcomes were weight related changes in lifestyle and quality of life. Results. At week 69, 52% of the patients with and 44% of those without maintenance program had lost weight ≥5%, P=0.40, and, at week 121, 33% and 34%, P=0.77, respectively. At week 121 secondary outcomes did not differ between the groups among those successfully followed up. Conclusions. This one-year maintenance program was not effective in preventing weight regain in severely obese patients. Trial Registration. This trial is registered under clinicaltrials.gov Identifier: NCT00590655.

  14. Implementing a Reliability Centered Maintenance Program at NASA's Kennedy Space Center

    National Research Council Canada - National Science Library

    Tuttle, Raymond

    1998-01-01

    .... A reliability centered maintenance (RCM) program seeks to offer equal or greater reliability at decreased cost by insuring only applicable, effective maintenance is performed and by in large part replacing time based maintenance...

  15. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Science.gov (United States)

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... airworthiness maintenance program use by fractional ownership program manager. Fractional ownership program... through 91.1443. Any program manager who elects to maintain the program aircraft using a continuous...

  16. A study on maintenance rule program and its application to Korean NPP - Rev.1

    International Nuclear Information System (INIS)

    Hwang, Mee Jeong; Kim, Kil Yoo; Yang, Joon Eon; Ha, Jae Joo

    2001-03-01

    The objective of the Maintenance Rule is to require monitoring of the overall continuing effectiveness of licensee maintenance programs to ensure that safety related and certain nonsafety-related SSCs are capable of performing their intended functions and, for nonsafety-related equipment failures will not occur that prevent the fulfillment of safety-related functions, and failures resulting in scrams and unnecessary actuations of safety-related systems are minimized. That is, proper maintenance is essential to plant safety. U.S. Maintenance Rule, which was effective July 1996 in USA., was not officially adopted in Korea by Korean regulatory body. However, since many PSA and IPE have been performed for NPPs, the philosophy and usefulness of the Maintenance Rule as well as performance-based regulation are being acceptable. We survey the Maintenance Rule program and applications in the USA, and also developed the Maintenance Rule program to apply to Korean NPPs. In addition, we applied the Maintenance Rule Program apply to Ulchin 3,4 Units roughly with the Maintenance Rule Program developed in this project

  17. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  18. Enhanced human performance of utility maintenance programs

    International Nuclear Information System (INIS)

    Fresco, A.; Haber, S.; O'Brien, J.

    1993-01-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant's maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program

  19. CLEAN-ROADS project: air quality considerations after the application of a novel MDSS on winter road maintenance activities

    Science.gov (United States)

    Pretto, Ilaria; Malloci, Elisa; Tonidandel, Gabriele; Benedetti, Guido; Di Napoli, Claudia; Piazza, Andrea; Apolloni, Roberto; Cavaliere, Roberto

    2016-04-01

    With this poster we present the environmental benefit on air quality derived by the application of the CLEAN-ROADS pilot project. The CLEAN-ROADS project addresses the problem of the environmental pollution caused by de-icing salts during winter road maintenance activities in the Province of Trento (Italy). A demonstrative Maintenance Decision Support System (MDSS) has been developed in order to improve the intervention procedures of the road management service. Specifically it aims to optimize the efficiency of how available resources (e.g., salt consumption) are currently used while guaranteeing the current level of road safety. The CLEAN-ROADS project has been tested and validated on a test area located in a valley bottom (Adige Valley), where the highest optimization margins are to be expected. The project supports current road maintenance practices, which has proved to be reliable and accurate, with a new scalable and energy-efficient road monitoring system. This system is based on a network of road weather stations (road weather information system, RWIS) installed on the test route. It is capable to collect real-time data about the road conditions and to perform short-term and now-cast road weather forecasts, which actively integrate weather data and bulletins covering the target area [1]. This poster presents the results obtained from a three-year monitoring activity with the aim to (1) determine the impact of de-icing salts on air quality and (2) quantify the improvements obtained by the application of the CLEAN-ROADS project on air quality. The Ambient Air Quality and Cleaner Air for Europe Directive (2008/50/EC) states that contributions to exceedances of particulate matter PM10 limit values that are attributable to road winter salting may be subtracted when assessing compliance with air quality limit values, once provided that reasonable measures have been taken to lower concentrations [2]. As the de-icing salts used in road maintenance are mainly based

  20. 21 CFR 1271.160 - Establishment and maintenance of a quality program.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Establishment and maintenance of a quality program... Establishment and maintenance of a quality program. (a) General. If you are an establishment that performs any... corrective actions relating to core CGTP requirements, including reaudits of deficiencies, are taken and...

  1. Status of the reliability centered maintenance program at Ontario Hydro's Bruce 'A' Nuclear Division

    International Nuclear Information System (INIS)

    Khan, I.

    1995-01-01

    Bruce A started a preventive maintenance (PM) quality improvement program in August of 1991. This initiative was taken to address the concerns expressed by the AECB and the Peer Audits finding. The concerns were on the quality of the Bruce A PM Program and its execution in the field. Reliability Centered Maintenance (RCM) analysis was selected as the PM program quality improvement and optimization technique. Therefore, RCM became a key component of Bruce A's Integrated PM program and maintenance strategy. As a result of RCM implementation, and improvements in the work planning and scheduling process, Bruce A is seeing downward trends in the corrective maintenance work load, maintenance preventable forced outages, overdue/missed PM tasks and corrective maintenance backlog. Control Room Operators have reported observing an improvement in systems and equipment response to transients. Other benefits include a documented, controlled and traceable PM program. In addition, the team approach required by RCM has started to improve staff confidence in the PM program which, in turn, is improving the compliance with the PM program. (author)

  2. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008 [summary].

    Science.gov (United States)

    2008-01-01

    The Florida Department of Transportation : (FDOT) has used its maintenance rating : program (MRP) to evaluate the states : highway maintenance conditions and : determine asset maintenance needs since : 1985. Periodic evaluation of the program is :...

  3. Building Maintenance and Utilities Management. Florida Vocational Program Guide.

    Science.gov (United States)

    University of South Florida, Tampa. Dept. of Adult and Vocational Education.

    This program guide identifies primary concerns in the organization, operation, and evaluation of a building maintenance and utilities management program. It is designed for local school district and community college administrators, instructors, program advisory committees, and regional coordinating councils. The guide begins with the Dictionary…

  4. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Malmqvist, Stefan; Leboeuf-Yde, Charlotte

    2009-01-01

    of maintenance care. Previous studies have identified chiropractors' choices of case management strategies in response to different case scenarios. However, the rationale for these management strategies is not known. In other words, when presented with both the case, and different management strategies......Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use......, there was consensus on how to match these, but if only the management strategies were provided, would chiropractors be able to define the cases to fit these strategies? The objective with this study was to investigate if there is a common pattern in Finnish chiropractors' case management of patients with low back...

  5. Florida maintenance rating program (MRP) assessment and enhancement : final report, May 28, 2008.

    Science.gov (United States)

    2008-05-28

    The Maintenance Rating Program (MRP), developed in 1985 by FDOT, is a statewide maintenance system aimed : at evaluating the State highway maintenance conditions, and determining FDOT asset maintenance needs. In the : quest for continuous improvement...

  6. A study of adopting maintenance rule under the periodic safety review and reliability centered maintenance program

    International Nuclear Information System (INIS)

    Kilyoo, Kim

    2001-01-01

    U.S Maintenance Rule (MR) has three main functions. One is to monitor the performance changes of SSCs (Structure, System, and Component) caused by risk informed applications. Periodic Safety Review (PSR) program is widely adopted in Europe while it is not adopted in U. S. A where MR and new oversight program are instead used. Recently, in Korea, it was determined to adopt PSR, and the first PSR program has started this year for Kori unit 1 as a pilot plant. Also, a traditional Reliability Centered Maintenance (RCM) has been performed for 4 systems of YGN unit 1 and 2 and it will be applied to the other nuclear power plants in Korea. However, since MR is adopting many useful concept of RCM, traditional RCM could not be further performed without being associated with MR. Thus, MR, RCM and PSR have recently become hot issue policies which should be well associated each other in Korea, and this paper suggests a desirable new maintenance process which would embrace the concepts of the three policies, and also discusses whether U.S. MR is necessary even though a PSR program is already adopted, and if necessary, then how cost-effectively it can be introduced to. (author)

  7. Development of Simulator Maintenance Engineer Qualification Program Draft

    International Nuclear Information System (INIS)

    Chung, Kyung Hun

    2010-01-01

    As of 2009, KHNP has currently seven full scope simulators that are used for training of Nuclear Power Plant (NPP) Operators. Well-trained Simulator Maintenance Engineers (SME) are required to support these simulators. These SMEs will maintain and address any issues identified or any changes required for keep up the simulator with their respective plant sites. These issues will be identified as Simulator Discrepancy Reports (DR) or Work Order (WO) by the simulator operation personnel in KHNP. The simulator maintenance is a very complex. The simulator consists of many areas of process and requires experts in software modeling for different processes such as Neutronics, thermohydraulics, Logics, control, Electrical systems and computer systems as well as hardware subjects such as I and C, I/O, computers, etc. All these areas need experts the subject expertise need to be divided among SME's. In other word the SME's need to be trained for different expertise as well as having different level of SME's. KHNP has seen the need to outsource the maintenance work for these complex simulators. To have one company concentrating on this work will have many benefits such as: · Provides proper and well trained experts · Maintains consistent support personnel · Maintains the maintenance history for the simulator · Coordinates and Maintains the knowledge in house · The simulator maintenance will be consistent In order to accomplish the goals, KEPCO RI has recognized that there is a need for a program to adequately train and qualify the SME's. KEPCO RI and GSE, which has provided 6 simulators among 7 NPP simulators in Korea, have jointly developed this Simulator Maintenance Engineer Qualification Program (SMEQP). After issue of this plan, KEPCO RI will maintain and modify as needed periodically to meet the goals and purpose of the plan

  8. Improved Navy Maintenance Through Corrosion-Fatigue Assessment Program

    National Research Council Canada - National Science Library

    Hoppe, Wally

    2008-01-01

    ... to evaluate issues relevant to corrosion-fatigue of aircraft components. In this multi-year, multi-contract program, tools have been developed to assist in the establishment of maintenance options for corroded components...

  9. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  10. Status of maintenance in the US nuclear power industry 1985. Volume 2. Description of programs and practices

    International Nuclear Information System (INIS)

    1986-06-01

    This report documents a review of the status of maintenance programs and practices in the US commercial nuclear power industry. The purpose of this review is to establish a baselines reference for evaluating the effectiveness of future industry activities in maintenance. Two methods used to collect progammatic data. First, a Maintenance Review Protocol was used during site visits to eight selected power plants to collect in-depth maintenance program information. Second, a Maintenance Questionnaire was filled out by NRC Resident Inspectors regarding maintenance programs at their plant. The protocol and questionnaire contained items regarding five broad categories of maintenance: (1) organization and administration, (2) facilities and equipment, (3) procedures, (4) personnel, and (5) work control. The study found that there is wide variability in industry maintenance programs. However, the industry is currently undergoing changes in maintenance practices, and adherence to INPO and NUMARC guidance in maintenance may bring about more systematically developed program practices

  11. Winter therapy for the accelerators

    CERN Multimedia

    Corinne Pralavorio

    2016-01-01

    Hundreds of people are hard at work during the year-end technical stop as all the accelerators are undergoing maintenance, renovation and upgrade operations in parallel.   The new beam absorber on its way to Point 2 before being lowered into the LHC tunnel for installation. The accelerator teams didn’t waste any time before starting their annual winter rejuvenation programme over the winter. At the end of November, as the LHC ion run was beginning, work got under way on the PS Booster, where operation had already stopped. On 14 December, once the whole complex had been shut down, the technical teams turned their attention to the other injectors and the LHC. The year-end technical stop (YETS) provides an opportunity to carry out maintenance work on equipment and repair any damage as well as to upgrade the machines for the upcoming runs. Numerous work projects are carried out simultaneously, so good coordination is crucial. Marzia Bernardini's team in the Enginee...

  12. Standards for maintenance documentation of COSMOS programs

    International Nuclear Information System (INIS)

    Burstall, R.F.; Rickets, T.M.; Butland, A.T.D.

    1982-06-01

    The Compatible Open Shop Modular Operating Scheme (COSMOS) is used for fast reactor neutronics and subassembly distortion calculations in the UK. It provides database and databank facilities for this purpose. A large number of applications programs use these facilities. This report sets down the standards agreed for use in the preparation of maintenance documents for these programs. These standards have been developed as the result of experience with earlier more complicated standards. Some of the terminology used in this report is particular to COSMOS, but the general features of the standard may be useful to those responsible for other computer programs. (author)

  13. 100-year history of the development of bread winter wheat breeding programs

    Directory of Open Access Journals (Sweden)

    М. А. Литвиненко

    2016-05-01

    Full Text Available Purpose. Review of the main achievements of the Wheat Breeding and Seed ProductionDepartment in the Plant Breeding and Genetic Institute – National Centre of Seed and Cultivar Investigation in the developing theoretical principles of breeding and creation of winter wheat varieties of different types during 100-year (1916–2016 period of breeding programs realization. Results. The main theoretical, methodical developments and breeding achievements of Wheat Breeding and Seed Production Department during 100-year (1916–2016 history have been considered. In the course of the Department activity, the research and metho­dology grounds of bread winter wheat breeding and seed production have been laid, 9 stages of breeding programs development have been accomplished. As a result, more than 130 varieties of different types have been created, 87 of them have been released in some periods or registered in the State registers of plants varieties of Ukraine and other countries and grown in the total sowing area about 220 million hectares.

  14. A Compromise Programming Model for Highway Maintenance Resources Allocation Problem

    Directory of Open Access Journals (Sweden)

    Hui Xiong

    2012-01-01

    Full Text Available This paper formulates a bilevel compromise programming model for allocating resources between pavement and bridge deck maintenances. The first level of the model aims to solve the resource allocation problems for pavement management and bridge deck maintenance, without considering resource sharing between them. At the second level, the model uses the results from the first step as an input and generates the final solution to the resource-sharing problem. To solve the model, the paper applies genetic algorithms to search for the optimal solution. We use a combination of two digits to represent different maintenance types. Results of numerical examples show that the conditions of both pavements and bridge decks are improved significantly by applying compromise programming, rather than conventional methods. Resources are also utilized more efficiently when the proposed method is applied.

  15. An optimal maintenance policy for machine replacement problem using dynamic programming

    OpenAIRE

    Mohsen Sadegh Amalnik; Morteza Pourgharibshahi

    2017-01-01

    In this article, we present an acceptance sampling plan for machine replacement problem based on the backward dynamic programming model. Discount dynamic programming is used to solve a two-state machine replacement problem. We plan to design a model for maintenance by consid-ering the quality of the item produced. The purpose of the proposed model is to determine the optimal threshold policy for maintenance in a finite time horizon. We create a decision tree based on a sequential sampling inc...

  16. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  17. An evaluation of the Browns Ferry Nuclear Plant preventive maintenance program based on reliability centered maintenance analysis

    International Nuclear Information System (INIS)

    McCullough, C.L.; McCullough, C.A.

    1989-01-01

    Reliability centered maintenance (RCM) techniques were used to support a preventative maintenance (PM) upgrade program (PMUP) performed at TVA Browns Ferry Nuclear Plant (BFNP). The purpose of the RCM analysis was to identify critical equipment based on risk and economic importance and to evaluate the PM activities applicable to that equipment. The analysis may be conveniently divided into three steps, which will be outlined in the Approach section of this paper. The net benefit of the RCM approach was a prioritization of the focus of the PM upgrade program so that plant components receive attention proportional to their importance, and assurance that PM activities properly address the most likely component failure causes

  18. Adherence to a maintenance exercise program 1 year after pulmonary rehabilitation: what are the predictors of dropout?

    Science.gov (United States)

    Heerema-Poelman, Ankie; Stuive, Ilse; Wempe, Johan B

    2013-01-01

    To evaluate adherence to a maintenance exercise program in patients with chronic obstructive pulmonary disease (COPD) and explore predictors for adherence. Seventy patients with COPD were referred to a home-care maintenance exercise program after completing pulmonary rehabilitation (PR) in the rehabilitation center. Adherence (yes/no) to the maintenance program was assessed by a self-reported questionnaire, where adherence was defined as attending the maintenance program 1 year after PR. Early dropouts received a self-reported questionnaire after 6 months and the remaining patients after 12 months. Lung function, exercise capacity, exercise self-efficacy, illness perceptions, health-related quality of life, levels of anxiety and depression, duration of PR, and the number of exacerbations were studied as possible predictors of adherence. Ten patients died or were lost to followup. Of the remaining 60 patients, 73.3% and 63.3% were adherent to the maintenance exercise program after 6 and 12 months, respectively. Forced expiratory volume in 1 second (FEV1) (P = .021), Hospital Anxiety and Depression Scale depression score (P = .025), and duration of PR (P = .018) were significant predictors of adherence to the maintenance program. Adherence to the maintenance exercise program included a 36.7% drop-out rate during the first year after completing PR. Experiencing exacerbations was the most reported reason for dropout. Poorer lung function, shorter initial PR course measured by reviewing patient records, and higher level of depressive symptoms were predictive of drop-out to the maintenance program. Adherence to the maintenance program needs to be improved for patients with lower FEV1, with signs of depression, or with a shorter initial PR course.

  19. 25 CFR 170.808 - Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can BIA Road Maintenance Program funds be used to improve... THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.808 Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities? No. BIA Road...

  20. Road salt application planning tool for winter de-icing operations

    Science.gov (United States)

    Trenouth, William R.; Gharabaghi, Bahram; Perera, Nandana

    2015-05-01

    Road authorities, who are charged with the task of maintaining safe, driveable road conditions during severe winter storm events are coming under increasing pressure to protect salt vulnerable areas (SVAs). For the purpose of modelling urban winter hydrology, the temperature index method was modified to incorporate ploughing and salting considerations and was calibrated using winter field data from two sites in Southern Ontario and validated using data collected from a section of Highway 401 - Canada's busiest highway. The modified temperature index model (MTIM) accurately predicted salt-induced melt (R2 = 0.98 and 0.99, RMSE = 19.9 and 282.4 m3, CRM = -0.003 and 0.006 for calibration and validation sites respectively), and showed a demonstrable ability to calculate the Bare Pavement Regain Time (BPRT). The BPRT is a key factor on road safety and the basis for many winter maintenance performance standards for different classes of highways. Optimizing salt application rate scenarios can be achieved using the MTIM with only two meteorological forecast inputs for the storm event - readily available on-line through the Road Weather Information System (RWIS) - and can serve as a simple yet effective tool for winter road maintenance practitioners seeking to optimize salt application rates for a given storm event in salt vulnerable areas.

  1. Association of wintering raptors with Conservation Reserve Enhancement Program grasslands in Pennsylvania

    Science.gov (United States)

    Wilson, A.; Brittingham, M.; Grove, G.

    2010-01-01

    Conservation grasslands can provide valuable habitat resource for breeding songbirds, but their value for wintering raptors has received little attention. We hypothesized that increased availability of grassland habitat through the Conservation Reserve Enhancement Program (CREP) has resulted in an increase or redistribution in numbers of four species of raptors in Pennsylvania since 2001. We tested this by analyzing winter raptor counts from volunteer surveys, conducted from 2001 to 2008, for Red-tailed Hawks (Buteo jamaicensis), Rough-legged Hawks (Buteo lagopus), Northern Harriers (Circus cyaneus), and American Kestrels (Falco sparverius). During that period, numbers of wintering Northern Harriers increased by more than 20% per year. Log-linear Poisson regression models show that all four species increased in the region of Pennsylvania that had the most and longest-established conservation grasslands. At the county scale (N= 67), Bayesian spatial models showed that spatial and temporal population trends of all four species were positively correlated with the amount of conservation grassland. This relationship was particularly strong for Northern Harriers, with numbers predicted to increase by 35.7% per year for each additional 1% of farmland enrolled in CREP. Our results suggest that conservation grasslands are likely the primary cause of the increase in numbers of wintering Northern Harriers in Pennsylvania since 2001. ?? 2010 The Authors. Journal of Field Ornithology ?? 2010 Association of Field Ornithologists.

  2. Guide for monitoring effectiveness of utility Reliability Centered Maintenance (RCM) programs

    International Nuclear Information System (INIS)

    Midgett, W.D.; Wilson, J.F.; Krochmal, D.F.; Owsenek, L.W.

    1991-02-01

    Reliability centered maintenance (RCM) programs help utilities optimize preventive maintenance efforts while improving plant safety and economy through increased dependability of plant components. The project team developed this guide and accompanying methodology based on status updates from the Ginna and San Onofre demonstration projects. These updates addressed areas ranging from system selection to the effectiveness of RCM program implementation. In addition, the team incorporated information from a 12-utility survey soliciting opinions on the need for a methodology to monitor RCM cost-effectiveness. An analysis of the 12-utility survey showed that no techniques had been developed to measure RCM program cost-effectiveness. Thus, this guide addresses two key areas: Pros and cons of various monitoring techniques available to assess the overall effectiveness of RCM and a methodology for specifically evaluating the cost-effectiveness of RCM programs. 1 fig

  3. Improving maintenance of lost weight following a commercial liquid meal replacement program: a preliminary study.

    Science.gov (United States)

    Ames, Gretchen E; Patel, Roshni H; McMullen, Jillian S; Thomas, Colleen S; Crook, Julia E; Lynch, Scott A; Lutes, Lesley D

    2014-01-01

    Clinic-based liquid meal replacement (800kcals/day) programs produce substantial weight loss. Nevertheless, long-term maintenance remains a challenge. A limitation of maintenance programs is that they continue to promote large behavior changes that are initially required to induce weight loss which may be unsustainable long-term. The study aims were to conduct a preliminary assessment of the feasibility, acceptability, and effectiveness of a small changes maintenance intervention (SCM) for 30 patients who completed liquid meal replacement program (LMR). The 20-session SCM delivered over 52 weeks offered no preset goals for maintenance behaviors and all changes in behavior were self-selected. Participants had a median BMI of 40.9 kg/m(2) and weight of 111 kg at the start of LMR. At LMR completion, they lost 18% (21 kg) of body weight. The SCM was completed by 22 patients (73%); 19 completers (86%) attended ≥ 17 of 20 sessions with a median satisfaction rating of 9 (on a scale of 1 to 9). Completers were asked to record self-selected maintenance behaviors daily (median 351 days recorded). The most commonly reported daily behaviors were self-weighing, use of meal replacements and step counting. Median percent regain at week 52 was 14% (2.8 kg) of lost weight (range, -42 to 74%), significantly less than a median of 56% (11 kg) percent regain of lost weight (range, -78 to 110%) in a demographically similar historical control group with no maintenance intervention after LMR completion (P<0.001). Thus, SCM holds promise for improving weight maintenance. Future research should compare SCM to standard maintenance programs that promote large program-directed changes. © 2013.

  4. Fuzzy Goal Programming Approach in Selective Maintenance Reliability Model

    Directory of Open Access Journals (Sweden)

    Neha Gupta

    2013-12-01

    Full Text Available 800x600 In the present paper, we have considered the allocation problem of repairable components for a parallel-series system as a multi-objective optimization problem and have discussed two different models. In first model the reliability of subsystems are considered as different objectives. In second model the cost and time spent on repairing the components are considered as two different objectives. These two models is formulated as multi-objective Nonlinear Programming Problem (MONLPP and a Fuzzy goal programming method is used to work out the compromise allocation in multi-objective selective maintenance reliability model in which we define the membership functions of each objective function and then transform membership functions into equivalent linear membership functions by first order Taylor series and finally by forming a fuzzy goal programming model obtain a desired compromise allocation of maintenance components. A numerical example is also worked out to illustrate the computational details of the method.  Normal 0 false false false EN-US X-NONE X-NONE MicrosoftInternetExplorer4

  5. Canada's MMP (Maintenance Management Professional) education and certification program

    International Nuclear Information System (INIS)

    Clegg, N.; Rae, V.

    2010-01-01

    'Full text:' Plant Engineering and Maintenance Association of Canada (PEMAC) is a national not-for-profit association providing global leadership, education and certification in world class maintenance, reliability and physical asset management practices. This presentation will introduce the MMP (Maintenance Management Professional) education and certification program and its 8 Modules. You will see the learning elements and learning outcomes of each of the 8 Modules which are delivered through selected colleges, institutes and universities across Canada using in-class, on-site and live, on-line formats in both official languages. (author)

  6. Advancements in nuclear plant maintenance programs

    International Nuclear Information System (INIS)

    Meligi, A.E.; Maras, M.C.

    1993-01-01

    The viability of the nuclear option as a technology choice for present and future electricity generation will be decided primarily on the basis of operating cost to achieve plant performance objectives. In a nuclear plant, performance is judged not only on availability and output rate but also on safety risk and radiation exposure. Operating, cost is essentially made up of the fuel cost and operation and maintenance (O and M) cost. Over the past decade, the industry average nuclear plant performance has improved significantly; however, this improvement was accompanied by rising O and M cost. The net result was that the nuclear option lost its long-standing economic advantage over the coal option, based on the industry average comparison, around 1987 - with the gap narrowing slightly in the last 2 years. In recent times, gas-fired plants have also become a basis for comparison. The electric generation cost comparisons of various fuel options has led to even greater scrutiny of nuclear plant performance, with the poorer performing plants facing the risk of shutdown. While effective O and M programs improve plant performance, present industry data show that there is no direct correlation between the cost of a plant O and M program and its associated performance. There is a significant number of existing tools and techniques in the O and M area that have proved to be successful and have resulted in significant benefits and payback. This paper presents an overview of the nuclear industry efforts to improve the conduct of O and M activities, describes the basic elements of an effective O and M program, and addresses some of the state-of-the-art tools and techniques to enhance maintenance work planning, training, and procedures

  7. Planning factors for developing an enterprise-wide picture archiving and communication system maintenance program.

    Science.gov (United States)

    Staley, S; Romlein, J; Chacko, A K; Wider, R

    2000-05-01

    Picture archiving and communication system (PACS) maintenance on an individual site basis has historically been a complex and costly challenge. With the advent of enterprise-wide PACS projects such as the Virtual Radiology Environment (VRE) project, the challenge of a maintenance program with even more complexities has presented itself. The approach of the project management team for the VRE project is not one of reactive maintenance, but one of highly proactive planning and negotiations, in hopes of capitalizing on the economies of scale of an enterprise-wide PACS maintenance program. A proactive maintenance program is one aspect of life-cycle management. As with any capital acquisition, life-cycle management may be used to manage the specific project aspects related to PACS. The purpose of an enterprise-wide warranty and maintenance life-cycle management approach is to maintain PACS at its maximum operational efficiency and utilization levels through a flexible, shared, yet symbiotic relationship between local, regional, and vendor resources. These goals include providing maximum operational performance levels on a local, regional, and enterprise basis, while maintaining acceptable costs and resource utilization levels. This goal must be achieved without negatively impacting point of care activities, regardless of changes to the clinical business environment.

  8. "Business Continuity and Information Security Maintenance" Masters’ Training Program

    OpenAIRE

    Miloslavskaya , Natalia; Senatorov , Mikhail; Tolstoy , Alexandr; Zapechnikov , Sergei

    2013-01-01

    Part 1: WISE 8; International audience; The experience of preparing for the "Business Continuity and Information Security Maintenance" (BC&ISM) Masters’ program implementation and realization at the "Information Security of Banking Systems" Department of the National Research Nuclear University MEPhI (NRNU MEPhI, Moscow, Russia) is presented. Justification of the educational direction choice for BC&ISM professionals is given. The model of IS Master being trained on this program is described. ...

  9. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  10. Program plan for future regulatory activity in nuclear-power-plant maintenance

    International Nuclear Information System (INIS)

    Badalamente, R.V.

    1982-10-01

    The intent of this paper is to describe the results of a study of nuclear power plant (NPP) maintenance conducted by Battelle's Pacific Northwest Laboratories (PNL) for the Nuclear Regulatory Commission (NRC). The purpose of the study for the NRC was to determine problems affecting human performance in NPP maintenance, pinpoint those which adversely affect public health and safety, review strategies for overcoming the problems, and suggest the direction that regulatory activities should take. Results of the study were presented to the NRC (Division of Human Factors Safety) in the form of a recommended program plan for future regulatory activity in NPP maintenance

  11. ORNL Surplus Facilities Management Program maintenance and surveillance plan for fiscal year 1984

    International Nuclear Information System (INIS)

    Coobs, J.H.; Myrick, T.E.

    1986-10-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy's (DOE) National SFMP, administered by the Richland Operations Office. The purpose and objectives of the national program are set forth in the current SFMP Program Plan and include (1) the maintenance and surveillance of facilities awaiting decommissioning, (2) planning for the orderly decommissioning of these facilities, and (3) implementation of a program to accomplish the facility disposition in a safe, cost-effective, and timely manner. As outlined in the national program plan, participating SFMP contractors are required to prepare a formal plan that documents the maintenance and surveillance (M and S) programs established for each site. This report has been prepared to provide this documentation for those facilties included in the ORNL SFMP

  12. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Science.gov (United States)

    2010-04-01

    ... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... Transportation Facility Maintenance Program The following activities are eligible for BIA Transportation Facility...

  13. Implementing a customer focused continual business improvement program to improve the maintenance process

    International Nuclear Information System (INIS)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M.

    2006-01-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  14. Implementing a customer focused continual business improvement program to improve the maintenance process

    Energy Technology Data Exchange (ETDEWEB)

    Kharshafdjian, G.; Fisher, C.; Beres, T.; Brooks, S.; Forbes, S.; Krause, M.; McAuley, K.; Wendorf, M. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada)

    2006-07-01

    Global market pressures and increasing competition demands that successful companies establish a continual business improvement program as part of implementing its business strategy. Such programs must be driven by the definition of quality from the customer's perspective. This customer quality focus often requires a change in all aspects of the business including products, services, processes and culture. This paper will describe how Atomic Energy of Canada Limited implemented a Continual Business Improvement Program in their Nuclear Laboratories Business Unit. In particular, to review how the techniques were applied to improve the maintenance process and the status of the project. Customer (internal users of the processes at CRL) feedback has shown repeatedly there is dissatisfaction of the maintenance process. Customers complain about jobs not getting done to schedule or being deferred. A project has been launched with the following goals: to improve the maintenance process customer satisfaction and increase trades wrench time by 30 minutes / trade / day. DMAIC (Define-Measure-Analyze-Improve-Control) methodology was applied to find out the Root Cause(s) of the problem, provide solutions, and implement improvements. The expected Operational Benefits include: Executing work efficiently to quality standards and business performance of the site, improve maintenance efficiencies, reduce cycle time for maintenance process and improve process yield, and improve customer and employee satisfaction. (author)

  15. Integrated predictive maintenance program vibration and lube oil analysis: Part I - history and the vibration program

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, H.

    1996-12-01

    This paper is the first of two papers which describe the Predictive Maintenance Program for rotating machines at the Palo Verde Nuclear Generating Station. The organization has recently been restructured and significant benefits have been realized by the interaction, or {open_quotes}synergy{close_quotes} between the Vibration Program and the Lube Oil Analysis Program. This paper starts with the oldest part of the program - the Vibration Program and discusses the evolution of the program to its current state. The {open_quotes}Vibration{close_quotes} view of the combined program is then presented.

  16. Integrated predictive maintenance program vibration and lube oil analysis: Part I - history and the vibration program

    International Nuclear Information System (INIS)

    Maxwell, H.

    1996-01-01

    This paper is the first of two papers which describe the Predictive Maintenance Program for rotating machines at the Palo Verde Nuclear Generating Station. The organization has recently been restructured and significant benefits have been realized by the interaction, or open-quotes synergyclose quotes between the Vibration Program and the Lube Oil Analysis Program. This paper starts with the oldest part of the program - the Vibration Program and discusses the evolution of the program to its current state. The open-quotes Vibrationclose quotes view of the combined program is then presented

  17. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  18. Adaptive temperature regulation in the little bird in winter: predictions from a stochastic dynamic programming model.

    Science.gov (United States)

    Brodin, Anders; Nilsson, Jan-Åke; Nord, Andreas

    2017-09-01

    Several species of small birds are resident in boreal forests where environmental temperatures can be -20 to -30 °C, or even lower, in winter. As winter days are short, and food is scarce, winter survival is a challenge for small endothermic animals. A bird of this size will have to gain almost 10% of its lean body mass in fat every day to sustain overnight metabolism. Birds such as parids (titmice and chickadees) can use facultative hypothermia, a process in which body temperature is actively down-regulated to a specific level, to reduce heat loss and thus save energy. During cold winter nights, these birds may decrease body temperature from the normal from 42 ° down to 35 °C, or even lower in some species. However, birds are unable to move in this deep hypothermic state, making it a risky strategy if predators are around. Why, then, do small northern birds enter a potentially dangerous physiological state for a relatively small reduction in energy expenditure? We used stochastic dynamic programming to investigate this. Our model suggests that the use of nocturnal hypothermia at night is paramount in these biomes, as it would increase winter survival for a small northern bird by 58% over a winter of 100 days. Our model also explains the phenomenon known as winter fattening, and its relationship to thermoregulation, in northern birds.

  19. Research Devices Maintenance Programs and Safety Network Infrastructures in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Zainudin Jaafar; Muhammad Zahidee Taat; Ishak Mansor

    2015-01-01

    Instrumentation and Automation Center (PIA) is responsible in carrying out maintenance work for building safety infrastructure and area for nuclear scientific and research work. Care cycle and nuclear scientific tools starting from the preparation of specifications until devices disposal- to get the maximum output from devices therefore PIA has introduced Effective and Comprehensive Maintenance Plan under Management/ Trust/ Development/ Science Fund budgets and also user, Asset Management, caring and handling of the devices. This paper also discussed more on case study related to using and handling so that it can be guidance and standard when its involving mishandling, improper maintenance, inadequacy of supervision and others including improvement suggestion programs. (author)

  20. The Nordic Maintenance Care Program – An interview study on the use of maintenance care in a selected group of Danish chiropractors

    Directory of Open Access Journals (Sweden)

    Leboeuf-Yde Charlotte

    2009-06-01

    Full Text Available Abstract Background Although maintenance care appears to be relatively commonly used among chiropractors, the indications for its use are incompletely understood. A questionnaire survey was recently carried out among Swedish chiropractors in order to identify their choice of various management strategies, including maintenance care. That study revealed a common pattern of choice of strategies. However, it would be necessary to verify these findings in another study population and to obtain some additional information best collected through an interview. Objectives The main aim of the present study was to attempt to reproduce the findings in the Swedish study and to obtain more information on the use of maintenance care. Method A group of 11 chiropractors were selected because they used maintenance care. They were interviewed using the questionnaire from the previous Swedish survey. The questionnaire consisted of a simple description of a hypothetical patient with low back pain and nine possible ways in which the case could develop ("scenarios". They could choose between six different management strategies for each scenario. In addition, the chiropractors were encouraged to provide their own definition of maintenance care in an open-ended question. Interviews were taped, transcribed and analyzed. For the open-ended question, statements were identified relating to six pre hoc defined topics on the inclusion criteria/rationale for maintenance care, the frequency of treatments, and the duration of the maintenance care program. Results The open-ended question revealed that in patients with low back pain, maintenance care appears to be offered to prevent new events. The rationale was to obtain optimal spinal function. There appears to be no common convention on the frequency of treatments and duration of the treatment program was not mentioned by any of the interviewees. Conclusion The results from the questionnaire in the Danish survey showed that

  1. Site surveillance and maintenance program for Palos Park: Report for 1987

    International Nuclear Information System (INIS)

    Golchert, N.W.

    1988-04-01

    The results of the environmental monitoring program conducted at Site A/Plot M in the Palos Park Forest Preserve area for CY 1987 are presented. The monitoring program is the ongoing remedial action that resulted from the original radiological characterization of the site. This study had determined that hydrogen-3 (as tritiated water) migrated from the burial ground and was present in two nearby hand-pumped picnic wells. The current program consists of sample collection and analysis of air, surface and subsurface water, and bottom sediment. The results of the analyses are used to (1) determine the migration pathway of water from the burial ground (Plot M) to hand-pumped picnic wells, (2) establish if buried radionuclides other than hydrogen-3 have migrated, and (3) generally characterize the radiological environment of the area. The program was designed to study the migration of non-radiological hazardous waste constituents that may have been buried with the radioactive waste. This was done by analyzing borehole water samples for selected heavy metals and organic compounds and analyzing quarterly water samples from the Red Gate Woods picnic well for inorganic constituents. Hydrogen-3 in the Red Gate Woods picnic well continued to show the same pattern of elevated levels in the winter and low concentrations in the summer, but the magnitude of the current winter peak was significantly less than in earlier years. 16 refs., 6 figs., 15 tabs

  2. Surveying the elements of successful infrared predictive maintenance programs

    Science.gov (United States)

    Snell, John R., Jr.; Spring, Robert W.

    1991-03-01

    This paper summarizes the results of a survey of over three hundred maintenance personnel who use imaging equipment within their company or organization. All had previously participated in one or more of our training programs. The companies took in a broad range of industry, including, among other, power generation, pulp and paper, metals, mining, petrochemical, automotive and general manufacturing. The organizations were mainly quite large, either commercial or public, and included governmental agencies, military, colleges and universities, municipalities, and utilities. Although we had a very tight time line for the survey, we were pleased to have a 15% response rate. The results show that some of the causes of success and failure in infrared programs are not unlike those associated with any type of program in an organizational structure, i.e. the need for accurate and timely communications; justification requirements; etc. Another set of problems was shared more closely with other startup maintenance technologies (for example, vibration monitoring), such as the need for trending data; providing appropriate technical training; achieving reproducible results; etc. Finally, some of the driving mechanisms are more specific to this technology, such as re-designing equipment so that it can be thermally inspected; establishing effective documentation strategies; etc.

  3. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  4. Investigating the Optimal Management Strategy for a Healthcare Facility Maintenance Program

    National Research Council Canada - National Science Library

    Gaillard, Daria

    2004-01-01

    ...: strategic partnering with an equipment management firm. The objective of this study is to create a decision-model for selecting the optimal management strategy for a healthcare organization's facility maintenance program...

  5. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  6. User Delay Cost Model and Facilities Maintenance Cost Model for a Terminal Control Area : Volume 3. User's Manual and Program Documentation for the Facilities Maintenance Cost Model

    Science.gov (United States)

    1978-05-01

    The Facilities Maintenance Cost Model (FMCM) is an analytic model designed to calculate expected annual labor costs of maintenance within a given FAA maintenance sector. The model is programmed in FORTRAN IV and has been demonstrated on the CDC Krono...

  7. World-wide developments in motor vehicle inspection/maintenance (I/M) programs

    Energy Technology Data Exchange (ETDEWEB)

    Klausmeier, R. [Consulting Inc., Austin, TX (United States); Kishan, S. [Radian Corporation, Austin, TX (United States)

    1995-12-31

    Motor vehicles contribute much to urban air pollution. As a result, most governments have enacted emission standards that significantly lower pollutant emission levels from new motor vehicles. For example, vehicles built in the United States emit 95 % fewer pollutants than uncontrolled vehicles when they are new. However, studies indicate that proper maintenance is needed to obtain the full benefit of vehicle emission controls. Furthermore, there is evidence that a significant percentage of the vehicle fleet is not properly maintained. This has led to the creation of motor vehicle Inspection/Maintenance (I/M) Programs. I/M programs inspect vehicles for indications that they are emitting excessive quantities of pollutants. Vehicles that fail the inspection must be repaired in order to comply with program requirements. The first I/M programs were implemented in the United States in the early 1970s. With substantial urging from the federal government, most of the U.S. states with severe air pollution problems have implemented I/M programs. Recently, with the passage of the U.S. Clean Air Act Amendments of 1990, many states have been required to significantly upgrade the performance and coverage of their I/M programs. I/M programs also have been implemented in Europe and recently in Asia. This presentation reviews developments in I/M programs for light-duty gasoline powered vehicles. Developments in I/M programs for diesel powered vehicles are briefly described. (author)

  8. World-wide developments in motor vehicle inspection/maintenance (I/M) programs

    Energy Technology Data Exchange (ETDEWEB)

    Klausmeier, R [Consulting Inc., Austin, TX (United States); Kishan, S [Radian Corporation, Austin, TX (United States)

    1996-12-31

    Motor vehicles contribute much to urban air pollution. As a result, most governments have enacted emission standards that significantly lower pollutant emission levels from new motor vehicles. For example, vehicles built in the United States emit 95 % fewer pollutants than uncontrolled vehicles when they are new. However, studies indicate that proper maintenance is needed to obtain the full benefit of vehicle emission controls. Furthermore, there is evidence that a significant percentage of the vehicle fleet is not properly maintained. This has led to the creation of motor vehicle Inspection/Maintenance (I/M) Programs. I/M programs inspect vehicles for indications that they are emitting excessive quantities of pollutants. Vehicles that fail the inspection must be repaired in order to comply with program requirements. The first I/M programs were implemented in the United States in the early 1970s. With substantial urging from the federal government, most of the U.S. states with severe air pollution problems have implemented I/M programs. Recently, with the passage of the U.S. Clean Air Act Amendments of 1990, many states have been required to significantly upgrade the performance and coverage of their I/M programs. I/M programs also have been implemented in Europe and recently in Asia. This presentation reviews developments in I/M programs for light-duty gasoline powered vehicles. Developments in I/M programs for diesel powered vehicles are briefly described. (author)

  9. Adherence to a Maintenance Exercise Program 1 Year After Pulmonary Rehabilitation WHAT ARE THE PREDICTORS OF DROPOUT?

    NARCIS (Netherlands)

    Heerema-Poelman, Ankie; Stuive, Ilse; Wempe, Johan B.

    2013-01-01

    PURPOSE: To evaluate adherence to a maintenance exercise program in patients with chronic obstructive pulmonary disease (COPD) and explore predictors for adherence. METHODS: Seventy patients with COPD were referred to a home-care maintenance exercise program after completing pulmonary rehabilitation

  10. Development of inspection and maintenance program for reactor and reactivity control units in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong-Garp

    1998-01-01

    This paper summarizes the overall program for inspection and maintenance of reactor structure and Reactivity Control Units (RCU) of HANARO during lifetime. The long-term plan for in-service inspection is introduced in the viewpoint of the structural integrity of reactor and RCU, and the operability of RCU mechanism. This program includes the list of components to be inspected, the schedule of inspection and maintenance, and the development of special tools and test rig that are required for the remote inspection and maintenance of reactor and RCU components. Preliminary results of the evaluation on the lifetime of RCU components are summarized based on the operation history since the installation of reactor. A test rig will be designed and constructed for the purposes of verifying the prolonged lifetime of RCU components being used, the performance of special tools, and the rehearsal of maintenance work as well. (author)

  11. Development of a Preventive Maintenance Program for Tooling Used in Powder Slush Molding

    Energy Technology Data Exchange (ETDEWEB)

    Lara-Curzio, Edgar [ORNL; Rios, Orlando [ORNL; Marquez Rossy, Andres E [ORNL

    2016-07-19

    ORNL collaborated with Faurecia Interior Systems to investigate the feasibility of developing a thermomagnetic preventive maintenance program for nickel tooling used in powder slush molding. It was found that thermal treatments at temperatures greater than 500°C can anneal strain hardening in nickel tooling and a range of temperatures and times for effective thermal annealing were identified. It was also observed that magnetic fields applied during thermal annealing do not alter the kinetics of strain hardening annealing. The results obtained in this investigation provide a foundation for establishing a preventive maintenance program for nickel tooling.

  12. Preventive maintenance program for a research and production reactor

    International Nuclear Information System (INIS)

    Rico, N.A.

    1990-01-01

    This program proposes a simple, rapid and efficient methodology for the task of developing a really preventive maintenance discipline. Moreover, the lower cost of its application -since it must satisfy the plant's budget-. To this purpose, an extremely economical and easily obtainable infrastructure is proposed. The following stage is referred to the commissioning system, subsequent supervision and follow-up. The experience gained from the two reactors as RA-6 (Bariloche Atomic Center) and NUR (RAE) of Argelia. Finally, the interacting characteristic of this program, since it may be rapidly adapted to different dimensions of plants, laboratories, etc., must be pointed out. (Author) [es

  13. Code Maintenance and Design for a Visual Programming Language Graphical User Interface

    National Research Council Canada - National Science Library

    Pierson, Graham

    2004-01-01

    This work adds new functionality to an existing visual programming environment. It applies software maintenance techniques for use with the Java Language in a Microsoft Windows operating system environment...

  14. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  15. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Myburgh, Corrie; Brandborg-Olsen, Dorthe; Albert, Hanne

    2013-01-01

    To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics.......To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics....

  16. Long-Term Body Weight Maintenance among StrongWomen–Healthy Hearts Program Participants

    Directory of Open Access Journals (Sweden)

    Rebecca A. Seguin

    2017-01-01

    Full Text Available Background. The repeated loss and regain of body weight, referred to as weight cycling, may be associated with negative health complications. Given today’s obesity epidemic and related interventions to address obesity, it is increasingly important to understand contexts and factors associated with weight loss maintenance. This study examined BMI among individuals who had previously participated in a 12-week, evidence-based, nationally disseminated nutrition and physical activity program designed for overweight and obese middle-aged and older women. Methods. Data were collected using follow-up surveys. Complete height and weight data were available for baseline, 12-week program completion (post-program and follow-up (approximately 3 years later for 154 women (response rate = 27.5%; BMI characteristics did not differ between responders and nonresponders. Results. Mean BMI decreased significantly from baseline to post-program (−0.5, P<0.001 and post-program to follow-up (−0.7, P<0.001. Seventy-five percent of survey respondents maintained or decreased BMI post-program to follow-up. Self-efficacy and social support for healthy eating behaviors (but not physical activity were associated with BMI maintenance or additional weight loss. Conclusions. These findings support the durability of weight loss following participation in a relatively short-term intervention.

  17. 49 CFR 180.416 - Discharge system inspection and maintenance program for cargo tanks transporting liquefied...

    Science.gov (United States)

    2010-10-01

    ... section. (v) Stainless steel flexible connectors with damaged reinforcement braid. (vi) Internal self... program for cargo tanks transporting liquefied compressed gases. 180.416 Section 180.416 Transportation... PACKAGINGS Qualification and Maintenance of Cargo Tanks § 180.416 Discharge system inspection and maintenance...

  18. Community Building Services Training Program: A Model Training Program to Provide Technical Training for Minority Adults in Construction, Building Maintenance,and Property Management. Final Report.

    Science.gov (United States)

    Community Building Maintenance Corp., Chicago, IL.

    A demonstration program, administered by a community based building maintenance, management, and construction corporation, was developed to provide technical training for minority adults in construction, building maintenance, and property management in the Chicago area. The program was concerned with seeking solutions to the lack of housing, job…

  19. An optimal maintenance policy for machine replacement problem using dynamic programming

    Directory of Open Access Journals (Sweden)

    Mohsen Sadegh Amalnik

    2017-06-01

    Full Text Available In this article, we present an acceptance sampling plan for machine replacement problem based on the backward dynamic programming model. Discount dynamic programming is used to solve a two-state machine replacement problem. We plan to design a model for maintenance by consid-ering the quality of the item produced. The purpose of the proposed model is to determine the optimal threshold policy for maintenance in a finite time horizon. We create a decision tree based on a sequential sampling including renew, repair and do nothing and wish to achieve an optimal threshold for making decisions including renew, repair and continue the production in order to minimize the expected cost. Results show that the optimal policy is sensitive to the data, for the probability of defective machines and parameters defined in the model. This can be clearly demonstrated by a sensitivity analysis technique.

  20. EVALUATION OF THE IMPLEMENTATION OF OPERATIONS AND MAINTENANCE PROGRAMS IN NEW JERSEY SCHOOLS

    Science.gov (United States)

    The Asbestos Hazard Emergency Response Act (AHERA) required all schools to develop and implement an asbestos management plan (AMP). The key component of the AMP is the operations and maintenance (O&M) program. A study was conducted to evaluate the implementation of O&M programs a...

  1. Maintenance planning and performance software for valve packing programs at nuclear power stations (ValvePro Version 2.5)

    International Nuclear Information System (INIS)

    Hutcheson, N.D.

    1994-01-01

    ValvePro Version 2.5 for Windows was developed to help power plant maintenance personnel improve maintenance productivity and quality through a simple, attractive software program, which can be installed on personal computer systems in use at many utilities today. This paper explains the functions of this software and how it can be used by a maintenance organization as a foundation for a consistent, effective valve packing program utilizing sound packing principles

  2. Hotline Allegations Involving Contracts for Programmed Depot Maintenance of KC-135 Aircraft

    National Research Council Canada - National Science Library

    1998-01-01

    Introduction. We performed the audit in response to 15 allegations made to the Defense Hotline involving two contracts on the Programmed Depot Maintenance of the KC-135 Aircraft, which Oklahoma City Air logistics...

  3. Winter/Summer Monsoon Experiment

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Winter/Summer Monsoon Experiment (MONEX) was conducted during the First Global GARP (Global Atmospheric Research Program) Experiment (FGGE). An international...

  4. Iowa state heating oil and propane program: 1996--1997 winter heating season. Final report

    International Nuclear Information System (INIS)

    1997-05-01

    The objective of the Iowa State Heating Oil and Propane Program is to develop a state-level, company-specific data collection effort so that retail price information on fuel oil and propane is collected by the staff of the Iowa Department of Natural Resources during the winter heating season. The second objective is to provide specific volume and retail price information to the US Department of Energy's (DOE's) Energy Information Administration on No. 2 heating oil and propane on a semi-monthly basis. This report summarizes the results of the residential No. 2 distillate fuel (home heating oil) and liquefied petroleum gas (propane) price survey over the 1996--1997 winter heating season in Iowa. The Iowa Department of Natural Resources conducted the survey under a cooperative financial assistance grant with the DOE Energy Information Administration (EIA)

  5. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  6. Predictors of Weight Loss Maintenance following an Insurance-Sponsored Weight Management Program

    OpenAIRE

    Christiaan G. Abildso; Olivier Schmid; Megan Byrd; Sam Zizzi; Alessandro Quartiroli; Sean J. Fitzpatrick

    2014-01-01

    Intentional weight loss among overweight and obese adults (body mass index ≥ 25 kg/m2) is associated with numerous health benefits, but weight loss maintenance (WLM) following participation in weight management programming has proven to be elusive. Many individuals attempting to lose weight join formal programs, especially women, but these programs vary widely in focus, as do postprogram weight regain results. We surveyed 2,106 former participants in a community-based, insurance-sponsored wei...

  7. Winter-to-winter variations in indoor radon

    International Nuclear Information System (INIS)

    Mose, D.G.; Mushrush, G.W.; Kline, S.W.

    1989-01-01

    Indoor radon concentrations in northern Virginia and central Maryland show a strong dependence on weather. Winter tends to be associated with higher than average indoor radon, and summer with lower than average. However, compared to the winter of 1986-1987, the winter of 1987-1988 was warmer and drier. Consequently, winter-to-winter indoor radon decreased by about 25%. This winter-to-winter decrease is unexpectedly large, and simulates winter-to-summer variations that have been reported

  8. Managing NASA's International Space Station Logistics and Maintenance program

    Science.gov (United States)

    Butina, Anthony J.

    2001-02-01

    The International Space Station will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines-it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally complete in April of 2006. Space logistics is a new concept that will have wide reaching consequences for both space travel and life on Earth. What is it like to do something that no one has done before? What challenges do you face? What kind of organization do you put together to perform this type of task? How do you optimize your resources to procure what you need? How do you change a paradigm within a space agency? How do you coordinate and manage a one of a kind system with approximately 5,700 Orbital Replaceable Units (ORUs)? How do you plan for preventive and corrective maintenance, when you need to procure spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors? How do you transport large sections of ISS hardware around the country? These are some of the topics discussed in this paper. From conception to operation, the ISS requires a unique approach in all aspects of development and operation. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station and only time will tell if we did it right. This paper discusses some of the experiences of the author after working 12 years on the International Space Station's integrated logistics & maintenance program. From his early days as a contractor supportability engineer and manager, to the NASA manager responsible for the entire ISS Logistics and Maintenance program. .

  9. Effects of a 14-month low-cost maintenance training program in patients with chronic systolic heart failure

    DEFF Research Database (Denmark)

    Prescott, Eva; Hjardem-Hansen, Rasmus; Ørkild, Bodil

    2009-01-01

    Exercise training is known to be beneficial in chronic heart failure (CHF) patients but there is a lack of studies following patient groups for longer duration with maintenance training programs to defer deconditioning.......Exercise training is known to be beneficial in chronic heart failure (CHF) patients but there is a lack of studies following patient groups for longer duration with maintenance training programs to defer deconditioning....

  10. Results of calendar year 1995 Well Inspection and Maintenance Program Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.

    1996-07-01

    This document is a compendium of results of the 1995 Monitor Well Inspection and Maintenance Program at the US Department of Energy's Oak Ridge Y-12 Plant. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the effective longevity of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant from August through December 1995

  11. Marginal costs for road maintenance and operation - a cost function approach

    OpenAIRE

    Haraldsson, Mattias

    2007-01-01

    Using observational data covering the whole Swedish national road network for the period 1998-2002, this paper estimates a set of maintenance and operation cost functions. It is found that costs for all operation and maintenance measures increase with traffic intensity, with two exceptions; total operation and winter operation measures are fixed cost activities. All other operation and maintenance measures have short run elasticities in the range 0.25-0.60. The impact of an additional vehicle...

  12. Evaluation of renewable energy alternatives for highway maintenance facilities.

    Science.gov (United States)

    2013-12-01

    A considerable annual energy budget is used for heating, lighting, cooling and operating ODOT : maintenance facilities. Such facilities contain vehicle repair and garage bays, which are large open : spaces with high heating demand in winter. The main...

  13. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem

    Science.gov (United States)

    Vahdani, Behnam; Jolai, Fariborz; Tavakkoli-Moghaddam, Reza; Meysam Mousavi, S.

    2012-07-01

    Maintenance outsourcing can be regarded as a strategic weapon to increase productivity and customer satisfaction in many companies, and this critical activity can be performed in a more efficient and effective way. This article presents two novel fuzzy possibilistic bi-objective zero-one programming (FPBOZOP) models for outsourcing of the equipment maintenance. In these models, cost parameters, including outsourcing cost, risk cost, time operations for performing the equipment maintenance and reliability level, as well as other influential parameters are considered through the outsourcing process. Moreover, the presented models can measure the capability of the company in doing different activities, unlike previous studies, in order to see the possibility of maintenance in-house, and can lead to make a best decision on the basis of the models' results. Both models are developed under uncertainty, which bring top managers the possibility of assigning more than one equipment or project to the supplier so that the profit is maximized, and the cost is minimized by considering bi-objectives concurrently. Then, a new fuzzy mathematical programming based possibilistic approach is introduced as a solution methodology from the recent literature to solve the proposed bi-objective zero-one programming (BOZOP) models and to reach a preferred compromise solution. Furthermore, a real-case study is utilized to demonstrate and to validate the effectiveness of the presented models. The computational results revealed that the models can be implemented in variety of problems in the domain of the equipment maintenance outsourcing and project outsourcing either from theory or application perspectives.

  14. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

  15. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  16. Activity report of the 40th Japanese Antarctic Research Expedition wintering party in 1999-2000

    Directory of Open Access Journals (Sweden)

    Hiroshi Miyaoka

    2011-03-01

    Full Text Available The 40th Japanese Antarctic Research Expedition (JARE-40 wintering party, with 40 members, has successfully conducted the third-year project of the Vth five-year JARE program, over the period from 1st February 1999 to 31st January 2000, at Syowa Station, Antarctica.The framework of the JARE-40 wintering party program was the same as those of JARE-38 and JARE-39, comprising three routine observation programs and project/monitoring research observation programs in upper atmospheric physics, atmospheric sciences and glaciology, geophysics, and biology. In addition to many continuing projects, several new observations were started: 50MHz/112MHz aurora radars and a VLF wave receiver as part of the ionosphere program, aerosol sonde observations of Polar Stratospheric Clouds (PSCs as part of the meteorological program, HF/MF radars as part of the upper atmospheric physics program, frequent VLBI experiments as part of the geophysics program, and biological field surveys (including two dives, including monitoring of the undersea behavior of Weddell seals using bio-logging devices.In terms of inland field surveys, two parties were organized: fuel transportation and glaciological/meteorological observations along the route to Mizuho Station in August-September and to Dome Fuji/Yamato air-basecamp in November-January. These surveys involved snow sampling, precise GPS positioning, and sub-glacial surveys using three types of ice radar.Logistical activities, conducted in cooperation with the JARE-40 summer party, included the construction of a second summer lodge, the startup of a second 300 kVA generator and co-generator system, the development of a sewage plant, solar power panels, an access road to the A-heliport, and the cleanup of disused buildings. During the wintering period, efforts were directed towards the maintenance of all facilities at Syowa Station, safety management, and practical support for field operations.The Antarctic Environmental

  17. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  18. Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

  19. The Effectiveness of Stress Management Program on Quality of Life among Methadone Maintenance Treatment Members

    Directory of Open Access Journals (Sweden)

    s Zarei

    2014-11-01

    Full Text Available Objective: The aim of present study was to investigate the effectiveness of stress management program on quality of life among methadone maintenance treatment members. Method: In this pre-test, post-test experimental study, 30 individual who referred to Saba MMT center in Pakdasht were randomly divided into experimental group (n=15 participants and control group (n=15 participants. The experimental group was undergone ten 90 minutes sessions of stress management program and the control group didn’t receive any treatment program. Quality of life questionnaire (SF-36 was administered. Result: The results showed that the mean sf-36 score in the experimental group had significant higher increased in comparison of control group. Conclusion: It can be concluded stress management program is effective on increasing of quality of life among methadone maintenance treatment members.

  20. Creation of an instrument maintenance program at W. M. Keck Observatory

    Science.gov (United States)

    Hill, G. M.; Kwok, S. H.; Mader, J. A.; Wirth, G. D.; Dahm, S. E.; Goodrich, R. W.

    2014-08-01

    Until a few years ago, the W. M. Keck Observatory (WMKO) did not have a systematic program of instrument maintenance at a level appropriate for a world-leading observatory. We describe the creation of such a program within the context of WMKO's lean operations model which posed challenges but also guided the design of the system and resulted in some unique and notable capabilities. These capabilities and the flexibility of the system have led to its adoption across the Observatory for virtually all PM's. The success of the Observatory in implementing the program and its impact on instrument reliability are presented. Lessons learned are reviewed and strategic implications discussed.

  1. Four Generations of Maintenance Resource Management Programs in the United States: An Analysis of the Past, Present, and Future

    Science.gov (United States)

    Taylor, James C.; Patankar, Manoj S.

    2001-01-01

    This paper analyzes four generations of Maintenance Resource Management (MRM) programs implemented by aviation maintenance organizations in the United States. Data collected from over ten years of survey research and field observations are used for this analysis; they are presented in a case-study format. The first three generations of MRM programs were episodic efforts to increase safety through teamwork, focus group discussions, and awareness courses, respectively. Now, the fourth generation programs, characterized by a commitment to long-term communication and behavioral changes in maintenance, are set to build on those earlier generations, toward a culture of mutual trust between mechanics, their managers, and regulators.

  2. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    International Nuclear Information System (INIS)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL's control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994

  3. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  4. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  5. Design, Development, and Maintenance of the GLOBE Program Website and Database

    Science.gov (United States)

    Brummer, Renate; Matsumoto, Clifford

    2004-01-01

    This is a 1-year (Fy 03) proposal to design and develop enhancements, implement improved efficiency and reliability, and provide responsive maintenance for the operational GLOBE (Global Learning and Observations to Benefit the Environment) Program website and database. This proposal is renewable, with a 5% annual inflation factor providing an approximate cost for the out years.

  6. 2003 Long-Term Surveillance and Maintenance Program Report

    International Nuclear Information System (INIS)

    2004-01-01

    are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE's responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation's nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE's legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM-50), as well as management of remedies involving ground water and surface water contaminated by former processing activities

  7. 2003 Long-Term Surveillance and Maintenance Program Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-07-01

    are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  8. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  9. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  10. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  11. Talent identification and deliberate programming in skeleton: ice novice to Winter Olympian in 14 months.

    Science.gov (United States)

    Bullock, Nicola; Gulbin, Jason P; Martin, David T; Ross, Angus; Holland, Terry; Marino, Frank

    2009-02-15

    The aims of this study were to talent transfer, rapidly develop, and qualify an Australian female athlete in the skeleton event at the 2006 Torino Winter Olympic Games and quantify the volume of skeleton-specific training and competition that would enable this to be achieved. Initially, 26 athletes were recruited through a talent identification programme based on their 30-m sprint time. After attending a selection camp, 10 athletes were invited to undertake an intensified skeleton training programme. Four of these athletes were then selected to compete for Australia on the World Cup circuit. All completed runs and simulated push starts were documented over a 14-month period. The athlete who eventually represented Australia at the Torino Winter Olympic Games did so following approximately 300 start simulations and about 220 training/competition runs over a period of 14 months. Using a deliberate programming model, these findings provide a guide to the minimum exposure required for a novice skeleton athlete to reach Olympic representative standard following intensified sport-specific training. The findings of this study are discussed in the context of the deliberate practice theory and offer the term "deliberate programming" as an alternative way of incorporating all aspects of expert development.

  12. Portsmouth Gaseous Diffusion Plant Decontamination and Decommissioning Program surveillance and maintenance plan, FY 1993--2002

    International Nuclear Information System (INIS)

    Schloesslin, W.

    1992-11-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Portsmouth Gaseous Diffusion Plant (PORTS) is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide PORTS the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER Program. The D ampersand D Program provides collective management of the sites within the plant which require decontamination and decommissioning, prioritizes those areas in terms of health, safety and environmental concerns, and implements the appropriate level of remedial action. The D ampersand D Program provides support to facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each inactive facility has been prepared. This report provides this documentation for the PORTS facilities currently included in the D ampersand D Program and includes projected resource requirements for the planning period of FY 1993 through FY 2002

  13. Attitude toward the out-patient cardiac rehabilitation program and facilitators for maintenance of exercise behavior.

    Science.gov (United States)

    Wong, Eliza M L; Zhong, Xue Bing; Sit, Janet W H; Chair, Sek Ying; Leung, Doris Y P; Leung, Carmen; Leung, K C

    2016-09-01

    This study examined the attitudes of Chinese patients with coronary heart disease (CHD) toward the outpatient cardiac rehabilitation program (OCRP), as well as their exercise behavior, intention, maintenance and related factors. A qualitative descriptive study design was used, and 22 CHD patients were recruited in Hong Kong in 2014. In-depth interviews and content analyses were conducted. The tripartite model of attitudes was adopted as research framework. Two themes were identified: (1) informant attitude (perception, affection, and practice) toward the OCRP and (2) Exercise Behavior - intention, maintenance and its related factors. Most informants showed positive perception and affection regarding the outpatient rehabilitation program, leading to regular practice of exercise in the program and at home. Peer, group dynamic, social support and Chinese culture influences on exercise behavior may serve as major facilitators to maintain exercise behavior. Positive attitude toward the OCRP enhanced the participation rate, whereas peer and social support from the family and workplace were useful to improve the maintenance of exercise behavior. Overall, this study provides insights into strategic planning for the OCRP and continual support for CHD patients in the community.

  14. After School Centers Project. Final Reports. Winter 1968-1969; Summer 1969.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Graduate School of Education.

    Two final reports, winter 1968-1969 and summer 1969, respectively describe the sixth and seventh sessions of the Cambridge School Department's After School Center Program and involving six elementary schools. Both the winter and the summer programs were designed to give disadvantaged children remedial instruction in reading and mathematics along…

  15. A Vocational Program for Recreational Vehicle Maintenance/Repair. A Report, 1977-78.

    Science.gov (United States)

    1978

    This report contains a secondary school curriculum guide designed to be used by vocational teachers in a one- or two-year recreational vehicle maintenance/repair program. In the preliminary pages, a description is given of the project that developed the curriculum, outlining its objectives and procedures in formulating the model interdisciplinary…

  16. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    McMaster, B.W.; Jones, S.B.; Sitzler, J.L.

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December

  17. Results of calendar year 1994 monitor well inspection and maintenance program, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    McMaster, B.W. [Univ. of Tennessee, Knoxville, TN (United States); Jones, S.B.; Sitzler, J.L. [Oak Ridge National Lab., TN (United States)

    1995-06-01

    This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for plugging and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.

  18. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  19. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  20. Weight maintenance through behaviour modification with a cooking course or neurolinguistic programming.

    Science.gov (United States)

    Sørensen, Lone Brinkmann; Greve, Tine; Kreutzer, Martin; Pedersen, Ulla; Nielsen, Claus Meyer; Toubro, Søren; Astrup, Arne

    2011-01-01

    We compared the effect on weight regain of behaviour modification consisting of either a gourmet cooking course or neurolinguistic programming (NLP) therapy. Fifty-six overweight and obese subjects participated. The first step was a 12-week weight loss program. Participants achieving at least 8% weight loss were randomized to five months of either NLP therapy or a course in gourmet cooking. Follow-up occurred after two and three years. Forty-nine participants lost at least 8% of their initial body weight and were randomized to the next step. The NLP group lost an additional 1.8 kg and the cooking group lost 0.2 kg during the five months of weight maintenance (NS). The dropout rate in the cooking group was 4%, compared with 26% in the NLP group (p=0.04). There was no difference in weight maintenance after two and three years of follow-up. In conclusion, weight loss in overweight and obese participants was maintained equally efficiently with a healthy cooking course or NLP therapy, but the dropout rate was lower during the active cooking treatment.

  1. Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995

    International Nuclear Information System (INIS)

    1995-11-01

    This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ''Remedial Action Surveillance and Maintenance''). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs

  2. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  3. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  4. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  5. Maintenance program, organization and procedures

    International Nuclear Information System (INIS)

    Schegk, J.R.R.

    1986-01-01

    The Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) operates two pressurized water reactors (PWR) with 1.200 MW and 1.300 MW and two boiling water reactors (BWR) with an electrical output of 1.300 MW each. The PWR were commissioned in 1975 and 1977 respectively and have so far achieved a cumulative availability of 72%. The BWR started operating in 1984 and 1985. Since than they have been generating with a cumulative availability of 88%. The reliability of the nuclear power stations resulted in a trouble-free operation. For the last two years, the unscheduled non-availability amounted to 3,7% and 6,5% for the PWR and the BWR respectively. These favourable operating results derive inter alia from systematic preventive maintenance and consistent outage management. Apart from the personnel structure in the power stations the functional sequence of planning, control, performance as well as evaluation of maintenance results constitute a closed cycle. In order to ensure and support an effective cooperation of the above mentioned four functional sequences of a cycle, uniform and computer-assisted information and planning aids have been introduced such as task lists, job ordering, time scheduling and materials management. As a result of this preventive maintenance system the average refueling outage period is 35 to 42 days. (orig.)

  6. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  7. The Development and Maintenance of Exemplary Formal Mentoring Programs in Fortune 500 Companies

    Science.gov (United States)

    Hegstad, Christine D.; Wentling, Rose Mary

    2004-01-01

    This study sought to advance current mentoring research by examining the development and maintenance of exemplary formal mentoring programs in the nation's top performing companies. The ADDIE model of instructional systems design, which incorporates five steps from needs analysis to evaluation, formed the conceptual framework guiding the study.…

  8. Regulatory approach of the monitoring the effectiveness of maintenance at nuclear power plants program

    International Nuclear Information System (INIS)

    Vajgel, Stefan

    2009-03-01

    The electrical power generation using nuclear power plants requires this installation being safety, reliable and available for the working periods. For this purpose, an adequate, effective and well conducted maintenance program makes an essential and useful tool to the owner of the plant. However, it is necessary to follow the regulatory requirements for this program implementation which monitories this maintenance effectiveness. There are Brazilian norms requirements which must be followed. The international regulatory guides establish these requirements in good details but it is necessary to verify if this methodology for implementing can be totally applied here in Brazil. Then, the american guide NUMARC 93-01 which details how can be implemented a program for this monitoring, shows some methods for using. In this thesis, the Delphi and Probabilistic Safety Analysis were briefly included because they were preferred for implementing this monitoring.in a Brazilian plant. The results which are being obtained show that, looking the regulatory aspects, the NUMARC 93-01 follows our regulations and gives good results for the plant management. (author)

  9. 38 CFR 1.478 - Disclosures to prevent multiple enrollments in detoxification and maintenance treatment programs...

    Science.gov (United States)

    2010-07-01

    ... psychological effects incident to withdrawal from the sustained use of a narcotic drug. (3) Maintenance... heroin or other morphine-like drugs. (4) Member program means a non-VA detoxification treatment or...

  10. Environmental problems related to winter traffic safety conditions

    OpenAIRE

    Hääl, Maire-Liis; Sürje, Peep

    2006-01-01

    The changeable Nordic climate has added problems to road maintenance and the environment to ensure traffic safety under winter conditions. The widespread use of salt (NaCl) for snow and ice removal from roads has resulted in environmental impacts in many areas. Some of the problems associated with the use of NaCl are the corrosion of bridges, road surfaces and vehicles and damage to roadside vegetation and aquatic system that are affected by water from de-iced roads. Accumulation of hard meta...

  11. The Effect of a Multiple Treatment Program and Maintenance Procedures on Smoking Cessation.

    Science.gov (United States)

    Powell, Don R.

    The efficacy of a multiple treatment smoking cessation program and three maintenance strategies was evaluated. Phases I and II of the study involved 51 subjects who participated in a five-day smoking cessation project consisting of lectures, demonstrations, practice exercises, negative smoking, and the teaching of self-control procedures. At the…

  12. Energy emergency planning guide: Winter 1977-78

    Energy Technology Data Exchange (ETDEWEB)

    1977-11-01

    This Energy Emergency Planning Guide for Winter, 1977-78 has been prepared in order to: identify and evaluate actions available to deal with energy emergencies this winter; provide an advance indication to the public of those actions considered most likely to be taken by the government, and provide industry, state, and local governments with suggestions about actions which they can take to deal with energy emergencies. The Guide contains specifications for over 50 standby programs and procedures, recommended implementation guidelines for using these programs keyed to a pre-emergency phase and three phases of shortfalls, and a design for an Energy Emergency Center. Flexible implementation guidelines are proposed for natural gas, petroleum, electricity/coal, and propane shortages. (MCW)

  13. Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-07-01

    The Decontamination and Decommissioning (D ampersand D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D ampersand D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S ampersand M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D ampersand D contractors are required to prepare formal plans that document the S ampersand M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D ampersand D Program

  14. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  15. How do Purple Sandpipers Calidris maritima survive the winter north of the Arctic circle?

    NARCIS (Netherlands)

    Summers, R.W.; Piersma, T.; Strann, K.B.; Wiersma, P.

    1998-01-01

    Winter north of the Arctic circle in northern Norway is colder, windier and there is less solar radiation than in eastern Scotland, at a latitude 13 degrees further south. We predicted from equations derived from heated taxidermic mounts that the maintenance metabolism (Basal Metabolic Rate plus

  16. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  17. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  18. Multiobjective Optimization of Aircraft Maintenance in Thailand Using Goal Programming: A Decision-Support Model

    Directory of Open Access Journals (Sweden)

    Yuttapong Pleumpirom

    2012-01-01

    Full Text Available The purpose of this paper is to develop the multiobjective optimization model in order to evaluate suppliers for aircraft maintenance tasks, using goal programming. The authors have developed a two-step process. The model will firstly be used as a decision-support tool for managing demand, by using aircraft and flight schedules to evaluate and generate aircraft-maintenance requirements, including spare-part lists. Secondly, they develop a multiobjective optimization model by minimizing cost, minimizing lead time, and maximizing the quality under various constraints in the model. Finally, the model is implemented in the actual airline's case.

  19. Remote maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Herndon, J.N.

    1985-01-01

    Remote maintenance techniques applied in large-scale nuclear fuel reprocessing plants are reviewed with particular attention to the three major maintenance philosophy groupings: contact, remote crane canyon, and remote/contact. Examples are given, and the relative success of each type is discussed. Probable future directions for large-scale reprocessing plant maintenance are described along with advanced manipulation systems for application in the plants. The remote maintenance development program within the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is also described. 19 refs., 19 figs

  20. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  1. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  2. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  3. Physical and Chemical Implications of Mid-Winter Pumping of Trunda Lakes - North Slope, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    Hinzman, Larry D. (University of Alaska Fairbanks, Water and Environmental Research Center); Lilly, Michael R. (Geo-Watersheds Scientific); Kane, Douglas L. (University of Alaska Fairbanks, Water and Environmental Research Center); Miller, D. Dan (University of Alaska Fairbanks, Water and Environmental Research Center); Galloway, Braden K. (University of Alaska Fairbanks, Water and Environmental Research Center); Hilton, Kristie M. (Geo-Watersheds Scientific); White, Daniel M. (University of Alaska Fairbanks, Water and Environmental Research Center)

    2005-09-30

    Tundra lakes on the North Slope, Alaska, are an important resource for energy development and petroleum field operations. A majority of exploration activities, pipeline maintenance, and restoration activities take place on winter ice roads that depend on water availability at key times of the winter operating season. These same lakes provide important fisheries and ecosystem functions. In particular, overwintering habitat for fish is one important management concern. This study focused on the evaluation of winter water use in the current field operating areas to provide a better understanding of the current water use practices. It found that under the current water use practices, there were no measurable negative effects of winter pumping on the lakes studied and current water use management practices were appropriately conservative. The study did find many areas where improvements in the understanding of tundra lake hydrology and water usage would benefit industry, management agencies, and the protection of fisheries and ecosystems.

  4. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  5. Environmental Restoration Program pollution prevention checklist guide for the surveillance and maintenance project phase

    International Nuclear Information System (INIS)

    1993-09-01

    DOE Order 5820.2 mandates that a surveillance and maintenance program be established in all shut-down facilities to ensure adequate containment of contamination, provide physical safety and security, and reduce potential public and environmental hazards. A key consideration in this process is the prevention of any waste to be generated from these activities. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Surveillance and Maintenance (S ampersand M) phase projects of the Environmental Restoration (ER) Program. This guide will help users document their PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  6. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  7. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    Oeverland, E.

    1990-01-01

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  8. TRUPACT-II Container Maintenance Program Plan

    International Nuclear Information System (INIS)

    1991-05-01

    This document details the maintenance, repair, and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container in accordance with OM-134, TRUPACT-II Container Operations and Maintenance Manual; and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers

  9. Integer 1/0 Knapsack Problem Dynamic Programming Approach in Building Maintenance Optimization

    Directory of Open Access Journals (Sweden)

    Viska Dewi Fawzy

    2017-12-01

    Full Text Available The most common problem in urban areas is the high public demand and the limited provision of housing. In meeting the needs of affordable housing for low income communities, the Government of Indonesia implements Rusunawa Project. Object of this research is Pandanarang Rusunawa. Rusunawa Pandanarang is one of the vertical housing in Cilacap that is facing deterioration issue and needs good maintenance management. This study aims at insetting priority and optimizing maintenance plan due to limited funds (limited budget and the amount of damage that must be repaired.This study uses one of the optimization methods of Dynamic Programing on the application of Integer 1/0 Knapsack Problem, to determine an schedule the maintenance activities. The Criteria that are used such as: the level of building components damage and the level of occupants participation. In the first criterion, the benefit (p is the percentage of damage that is fixed with the cost (w. While on the second criterion, the benefit (p is the percentage of occupant participation rate on the maintenance activities with the cost (w. For the budget of Rp 125.000.000, 00, it was obtained from the simulation that the value of the optimum solution on the first criterion at the 7th stage of 71.88% with total cost Rp 106.000.000, 00. At the second criterion, the value of the optimum solution at the 7th stage of 89.29% with total cost Rp 124.000.000, 00.

  10. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  11. Successful factors to a better maintenance effectiveness in Cernavoda NPP 's Unit 1

    International Nuclear Information System (INIS)

    Riedel, M.; Bigu, D.

    2001-01-01

    Two tables are presented titled 'Existing maintenance-specific and maintenance-related plant programs' and 'New programs intended to be developed', respectively. In the first table the following items are indicated and commented: 1. Corrective maintenance program; 2. EQ Program; 3. Equipment maintenance history program; 4. In service inspection program; 5. Lube oil analysis program; 6. MOVs program; 7. Operational test procedures; 8. Performance evaluation program; 9. Preventive maintenance program; 10. Spares management program; 11. Vibration monitoring program. In table 2 the following items are indicated and commented: 1. Check Valves program; 2. Electrical Cable Diagnostics; 3. Erosion-corrosion; 4. Temperature monitoring (infra red thermography; noncontact thermometer); 5. Airborne Ultrasound Detection program; 6. PdM Program. A flowchart is presented in figure 1 showing the maintenance strategies' selection. In figure 2 there is presented a flowchart showing the plants maintenance current approach. Finally, in figure 3 the station maintenance program is presented in a diagram structured on the following fields: concepts, requirements, strategies, specific programs and plans

  12. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  13. Maintenance of scientific instruments

    International Nuclear Information System (INIS)

    Lucero, E.

    1986-01-01

    During the last years Colombia has increased the use of nuclear techniques, instruments and equipment in ambitious health programs, as well as in research centers, industry and education; this has resulted in numerous maintenance problems. As an alternative solution IAN has established a Central Maintenance Laboratory for nuclear instruments within an International Atomic Energy Agency program for eight Latin American and nine Asian Countries. Established strategies and some results are detailed in this writing

  14. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  15. Annual summary report of the decontamination and decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1991

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1991-09-01

    The Surplus Facilities Management Program and Defense Facilities Decommissioning Program were established at Oak Ridge National Laboratory (ORNL) in 1976 in order to provide collective management of all surplus sites under ORNL control on the Oak Ridge Reservation. Some 34 facilities, classified into 3 civilian-related and 8 defense-related projects, are currently managed by the recently integrated Decontamination and Decommissioning Program. Support includes (1) surveillance and maintenance (S ampersand M) planning, (2) routine S ampersand M, and (3) special maintenance projects. This report documents routine S ampersand M, special projects, and special maintenance performed on these facilities for the period of October 1990 through September 1991

  16. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  17. A comparison of pine and spruce in recovery from winter stress; changes in recovery kinetics, and the abundance and phosphorylation status of photosynthetic proteins during winter.

    Science.gov (United States)

    Merry, Ryan; Jerrard, Jacob; Frebault, Julia; Verhoeven, Amy

    2017-09-01

    During winter evergreens maintain a sustained form of thermal energy dissipation that results in reduced photochemical efficiency measured using the chlorophyll fluorescence parameter Fv/Fm. Eastern white pine (Pinus strobus L.) and white spruce [Picea glauca (Moench) Voss] have been shown to differ in their rate of recovery of Fv/Fm from winter stress. The goal of this study was to monitor changes in photosynthetic protein abundance and phosphorylation status during winter recovery that accompany these functional changes. An additional goal was to determine whether light-dependent changes in light harvesting complex II (LHCII) phosphorylation occur during winter conditions. We used a combination of field measurements and recovery experiments to monitor chlorophyll fluorescence and photosynthetic protein content and phosphorylation status. We found that pine recovered three times more slowly than spruce, and that the kinetics of recovery in spruce included a rapid and slow component, while in pine there was only a rapid component to recovery. Both species retained relatively high amounts of the light harvesting protein Lhcb5 (CP26) and the PsbS protein during winter, suggesting a role for these proteins in sustained thermal dissipation. Both species maintained high phosphorylation of LHCII and the D1 protein in darkness during winter. Pine and spruce differed in the kinetics of the dephosphorylation of LHCII and D1 upon warming, suggesting the rate of dephosphorylation of LHCII and D1 may be important in the rapid component of recovery from winter stress. Finally, we demonstrated that light-dependent changes in LHII phosphorylation do not continue to occur on subzero winter days and that needles are maintained in a phosphorylation pattern consistent with the high light conditions to which those needles are exposed. Our results suggest a role for retained phosphorylation of both LHCII and D1 in maintenance of the photosynthetic machinery in a winter conformation

  18. Nuclear adaptor Ldb1 regulates a transcriptional program essential for the maintenance of hematopoietic stem cells.

    Science.gov (United States)

    Li, LiQi; Jothi, Raja; Cui, Kairong; Lee, Jan Y; Cohen, Tsadok; Gorivodsky, Marat; Tzchori, Itai; Zhao, Yangu; Hayes, Sandra M; Bresnick, Emery H; Zhao, Keji; Westphal, Heiner; Love, Paul E

    2011-02-01

    The nuclear adaptor Ldb1 functions as a core component of multiprotein transcription complexes that regulate differentiation in diverse cell types. In the hematopoietic lineage, Ldb1 forms a complex with the non-DNA-binding adaptor Lmo2 and the transcription factors E2A, Scl and GATA-1 (or GATA-2). Here we demonstrate a critical and continuous requirement for Ldb1 in the maintenance of both fetal and adult mouse hematopoietic stem cells (HSCs). Deletion of Ldb1 in hematopoietic progenitors resulted in the downregulation of many transcripts required for HSC maintenance. Genome-wide profiling by chromatin immunoprecipitation followed by sequencing (ChIP-Seq) identified Ldb1 complex-binding sites at highly conserved regions in the promoters of genes involved in HSC maintenance. Our results identify a central role for Ldb1 in regulating the transcriptional program responsible for the maintenance of HSCs.

  19. TRUPACT-II container maintenance program plan

    International Nuclear Information System (INIS)

    1990-11-01

    This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container, in accordance with requirements of the TRUPACT-II Container Operations and Maintenance Manual, OM-134, the TRUPACT-II Container Safety Analysis Report (SARP), and the TRUPACT-II Container Certificate of Compliance (Number 9218). The routine shipping and receiving inspections required by the Department of Transportation (DOT), Department of Energy (DOE), Nuclear Regulatory Commission (NRC) and other regulations are not addressed in this document. This document applies to all DOE shipping and receiving sites that use the TRUPACT-II containers

  20. Maintenance: Two Views.

    Science.gov (United States)

    Ballard, J. Barry; Burdette, Clarence E.

    1987-01-01

    Presents two viewpoints on the question of using funding from the Vocational Education Act to maintain ongoing vocational programs. Ballard argues that programs have improved qualitatively because of additional program improvement monies, whereas Burdette argues that the ban on using funds for maintenance treats some states unfairly. (CH)

  1. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  2. Implementation of laparoscopic hysterectomy: maintenance of skills after a mentorship program.

    Science.gov (United States)

    Twijnstra, A R H; Blikkendaal, M D; Kolkman, W; Smeets, M J G H; Rhemrev, J P T; Jansen, F W

    2010-01-01

    To evaluate the implementation and maintenance of advanced laparoscopic skills after a structured mentorship program in laparoscopic hysterectomy (LH). Cohort retrospective analysis of 104 successive LHs performed by two gynecologists during and after a mentorship program. LHs were compared for indication, patient characteristics and intraoperative characteristics. As a frame of reference, 94 LHs performed by the mentor were analyzed. With regard to indication, blood loss and adverse outcomes, both trainees performed LHs during their mentorship program comparable with the LHs performed by the mentor. The difference in mean operating time between trainees and mentor was not clinically significant. Both trainees progressed along a learning curve, while operating time remained statistically constant and comparable to that of the mentor. After completing the mentorship program, both gynecologists maintained their acquired skills as blood loss, adverse outcome rates and operating time were comparable with the results during their traineeship. A mentorship program is an effective and durable tool for implementing a new surgical procedure in a teaching hospital with respect to patient safety aspects, as indications, operating time and adverse outcome rates are comparable to those of the mentor in his own hospital during and after completing the mentorship program. Copyright © 2010 S. Karger AG, Basel.

  3. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  4. Improved management of winter operations to limit subsurface contamination with degradable deicing chemicals in cold regions

    NARCIS (Netherlands)

    French, H.K.; Zee, van der S.E.A.T.M.

    2014-01-01

    This paper gives an overview of management considerations required for better control of deicing chemicals in the unsaturated zone at sites with winter maintenance operations in cold regions. Degradable organic deicing chemicals are the main focus. The importance of the heterogeneity of both the

  5. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XX, CUMMINS DIESEL ENGINE, MAINTENANCE SUMMARY.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF THE REASONS AND PROCEDURES FOR DIESEL ENGINE MAINTENANCE. TOPICS ARE WHAT ENGINE BREAK-IN MEANS, ENGINE BREAK-IN, TORQUING BEARINGS (TEMPLATE METHOD), AND THE NEED FOR MAINTENANCE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "CUMMINS DIESEL ENGINE…

  6. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  7. Industry assessment of human factors in aviation maintenance and inspection research program : an assessment of industry awareness and use of the Federal Aviation Administration Office of Aviation Medicine Human Factors in Aviation Maintenance and Inspect

    Science.gov (United States)

    1998-03-01

    Ten years ago the Federal Aviation Administration (FAA) Office of Aviation Medicine embarked on a research and development program dedicated to human factors in aviation maintenance and inspection. Since 1989 FAA has invested over $12M in maintenance...

  8. Development of a computational program to planning and control of the IEA-R1 reactor maintenance

    International Nuclear Information System (INIS)

    Martins, Mauro Onofre; Madi Filho, Tufic

    2013-01-01

    Maintenance is an essential activity in nuclear reactors. The components of safety systems of an industrial plant should have a low probability of failure, especially if there is a high risk of accidents that may cause environmental damage. In nuclear facilities, the presence of security systems is a technical specification and a requirement for their license and operation. In order to manage the entire information flow from the maintenance of the IEA-R1, a computational program (software) was developed, which not only plans and control all the maintenance, but also updates the documents and records to safeguard the quality, ensuring the safe operation of the reactor. The software has access levels and provides detailed reports of all maintenance planned and implemented, together with an individual history of the equipment during its lifetime in the facility. This work presents all the stages of the software development, description, compatibility, application, advantages and results obtained experimentally. (author)

  9. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  10. Aircraft and ground vehicle friction correlation test results obtained under winter runway conditions during joint FAA/NASA Runway Friction Program

    Science.gov (United States)

    Yager, Thomas J.; Vogler, William A.; Baldasare, Paul

    1988-01-01

    Aircraft and ground vehicle friction data collected during the Joint FAA/NASA Runway Friction Program under winter runway conditions are discussed and test results are summarized. The relationship between the different ground vehicle friction measurements obtained on compacted snow- and ice-covered conditions is defined together with the correlation to aircraft tire friction performance under similar runway conditions.

  11. A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem

    DEFF Research Database (Denmark)

    Pour, Shahrzad M.; Drake, John H.; Ejlertsen, Lena Secher

    2017-01-01

    A railway signaling system is a complex and interdependent system which should ensure the safe operation of trains. We introduce and address a mixed integer optimisation model for the preventive signal maintenance crew scheduling problem in the Danish railway system. The problem contains many...... to feed as ‘warm start’ solutions to a Mixed Integer Programming (MIP) solver for further optimisation. We apply the CP/MIP framework to a section of the Danish rail network and benchmark our results against both direct application of a MIP solver and modelling the problem as a Constraint Optimisation...

  12. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  13. Maintenance viewpoint of a successful reactor program

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Grygiel, M.L.

    1984-05-01

    As the Operating and Support staffs of the FFTF organization have gained experience, the plant reliability and capacity factors have shown a steadily improving trend. The plant capacity factor for Cycle 4 was 99.5%. It is the purpose of this report to describe the evolution of the maintenance organization at the FFTF site from a general support organization to a technically proficient organization playing a major role in planning and performance of plant maintenance evolutions

  14. Adaptation and Implementation of Predictive Maintenance Technique with Nondestructive Testing for Power Plants

    International Nuclear Information System (INIS)

    Jung, Gye Jo; Jung, Nam Gun

    2010-01-01

    Many forces are pressuring utilities to reduce operating and maintenance costs without cutting back on reliability or availability. Many utility managers are re-evaluating maintenance strategies to meet these demands. To utilities how to reduce maintenance costs and extent the effective operating life of equipment, predictive maintenance technique can be adapted. Predictive maintenance had three types program which are in-house program, engineering company program and mixed program. We can approach successful predictive maintenance program with 'smart trust' concept

  15. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  16. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    International Nuclear Information System (INIS)

    Heinemann, J.L.; Millard, G.E.

    1997-08-01

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP

  17. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  18. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    Chockie, A.; Bjorkelo, K.

    1992-01-01

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  19. TRUPACT-II container maintenance program plan

    International Nuclear Information System (INIS)

    1990-01-01

    This document details the maintenance/repair and replacement of components, as well as the documentation required and the procedures to be followed to maintain the integrity of the TRUPACT-II container

  20. Explaining variations in state foster care maintenance rates and the implications for implementing new evidence-based programs

    Science.gov (United States)

    Goldhaber-Fiebert, Jeremy D.; Babiarz, Kimberly S.; Garfield, Rachel L.; Wulczyn, Fred; Landsverk, John; Horwitz, Sarah M.

    2013-01-01

    Background U.S. Child Welfare systems are involved in the lives of millions of children, and total spending exceeds $26 billion annually. Out-of-home foster care is a critical and expensive Child Welfare service, a major component of which is the maintenance rate paid to support housing and caring for a foster child. Maintenance rates vary widely across states and over time, but reasons for this variation are not well understood. As evidence-based programs are disseminated to state Child Welfare systems, it is important to understand what may be the important drivers in the uptake of these practices including state spending on core system areas. Data and methods We assembled a unique, longitudinal, state-level panel dataset (1990–2008) for all 50 states with annual data on foster care maintenance rates and measures of child population in need, poverty, employment, urbanicity, proportion minority, political party control of the state legislature and governorship, federal funding, and lawsuits involving state foster care systems. All monetary values were expressed in per-capita terms and inflation adjusted to 2008 dollars. We used longitudinal panel regressions with robust standard errors and state and year fixed effects to estimate the relationship between state foster care maintenance rates and the other factors in our dataset, lagging all factors by one year to mitigate the possibility that maintenance rates influenced their predictors. Exploratory analyses related maintenance rates to Child Welfare outcomes. Findings State foster care maintenance rates have increased in nominal terms, but in many states, have not kept pace with inflation, leading to lower real rates in 2008 compared to those in 1991 for 54% of states for 2 year-olds, 58% for 9 year-olds, and 65% for 16 year-olds. In multivariate analyses including socioeconomic, demographic, and political factors, monthly foster care maintenance rates declined $15 for each 1% increase in state unemployment and

  1. Costs of Development and Maintenance of an Internet Program for Teens with Type 1 Diabetes

    Science.gov (United States)

    Grey, Margaret; Liberti, Lauren; Whittemore, Robin

    2015-01-01

    Many adolescents with type 1 diabetes (T1D) have difficulty completing self-management tasks within the context of their social environments. Group-based approaches to psycho-educational support have been shown to prevent declines in glucose control, but are challenging to implement due to youths’ many activities and costs. A novel solution is providing psycho-educational support via the internet. The purpose of this study is to describe the cost of developing and maintaining two internet psycho-educational programs, both of which have been shown to improve health outcomes in adolescents with T1D. We calculated actual costs of personnel and programming in the development of TEENCOPE™ and Managing Diabetes, two highly interactive programs that were evaluated in a multi-site clinical trial (n=320). Cost calculations were set at U.S. dollars and converted to value for 2013 as expenses were incurred over 6 years. Development costs over 1.5 years totaled $324,609, with the majority of costs being for personnel to develop and write content in a creative and engaging format, to get feedback from teens on content and a prototype, and IT programming. Maintenance of the program, including IT support, a part-time moderator to assure safety of the discussion board (0.5–1 hour/week), and yearly update of content was $43,845/year, or $137.00 per youth over 4.5 years. Overall, program and site development were relatively expensive, but the program reach was high, including non-white youth from 4 geographically distinct regions. Once developed, maintenance was minimal. With greater dissemination, cost-per-youth would decrease markedly, beginning to offset the high development expense. PMID:26213677

  2. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  3. Comparison of mesoscale model and tower measurements of surface fluxes during Winter Icing and Storms Program/Atmospheric Radiation Measurement 91

    International Nuclear Information System (INIS)

    Oncley, S.P.; Dudhia, J.

    1994-01-01

    This study is an evaluation of the ability of the Pennsylvania State University/National Center for Atmospheric Research (NCAR) mesoscale model (MM4) to determine surface fluxes to see if measured fluxes should be assimilated into model runs. Fluxes were compared from a high-resolution (5 km grid spacing) MM4 run during one day of the Winter Icing and Storms Programs/Atmospheric Radiation Measurement (WISP/ARM) experiment (over NE Colorado in winter 1991) with direct flux measurements made from a tower over a representative site by a three-dimensional sonic anemometer and fast response temperature and humidity sensors. This tower was part of the NCAR Atmosphere-Surface Turbulent Exchange Research (ASTER) facility. Also, mean values were compared to check whether any differences were due to the model parameterization or model variables

  4. The History of Winter: teachers as scientists

    Science.gov (United States)

    Koenig, L.; Courville, Z.; Wasilewski, P. J.; Gow, T.; Bender, K. J.

    2013-12-01

    The History of Winter (HOW) is a NASA Goddard Space Flight Center-funded teacher enrichment program that was started by Dr. Peter Wasilewski (NASA), Dr. Robert Gabrys (NASA) and Dr. Tony Gow (Cold Regions Research and Engineering Laboratory, or CRREL) in 2001 and continues with support and involvement of scientists from both the NASA Cryospheric Sciences Laboratory and CREEL. The program brings educators mostly from middle and high schools but also from state parks, community colleges and other institutions from across the US to the Northwood School (a small, private boarding school) in Lake Placid, NY for one week to learn about several facets of winter, polar, and snow research, including the science and history of polar ice core research, lake ice formation and structure, snow pack science, winter ecology, and remote sensing including current and future NASA cryospheric missions. The program receives support from the Northwood School staff to facilitate the program. The goal of the program is to create 'teachers as scientists' which is achieved through several hands-on field experiences in which the teachers have the opportunity to work with polar researchers from NASA, CRREL and partner Universities to dig and sample snow pits, make ice thin sections from lake ice, make snow shelters, and observe under-ice lake ecology. The hands-on work allows the teachers to use the same tools and techniques used in polar research while simultaneously introducing science concepts and activities to support their classroom work. The ultimate goal of the program is to provide the classroom teachers with the opportunity to learn about current and timely cryospheric research as well as to engage in real fieldwork experiences. The enthusiasm generated during the week-long program is translated into classroom activities with guidance from scientists, teachers and educational professionals. The opportunity to engage with polar researchers, both young investigators and renowned

  5. The activities of the 42nd Japanese Antarctic Research Expedition (JARE-42 wintering team 2001-2002

    Directory of Open Access Journals (Sweden)

    Yoichi Motoyoshi

    2003-07-01

    Full Text Available The 42nd Japanese Antarctic Research Expedition (JARE-42 wintering team has conducted the Vth five-year JARE program during the period of February 1st 2001 to January 31st 2002, in which 40 members were engaged in the various scientific activities and maintenance of Syowa Station. The major observation programs of JARE-42 were as follows : Upper Atmo-spheric Physics-observations using Fabry-Perot imager, sodium Lidar and HFMF radar; Atmospheric Sciences and Glaciology-aerosols and air sampling, and shallow ice core drilling; Geophysics-superconducting gravity measurement, geodetic VLBI observations, and natural earthquake monitoring; Biology and Medicine-photosynthesis under sea water, populations census of penguins, and physiological and psychological adaptation to Antarctic environment, etc. In addition, satellite data receiving from ERS-2 and NOAA were also performed by using multi-purpose antenna at Syowa Station. Field activities included air sampling by using an aircraft, biological and geophysical observations, and reconnaissance survey for a possible aircraft runway around Syowa Station. Three inland traverse parties were organized, in which fuel transportation, maintenance of Dome Fuji Station, and various glaciological and geophysical observations were performed. A great efforts were made to maintain the facilities at Syowa Station by logistic personnel including mechanical engineers, radio operators, chefs, medical doctors, aircraft pilots and an engineer, an environmental engineer, a carpenter, a field assistant, a cinematographer, a satellite engineer, and an administrative officer. They were also involved in the support of field activities.

  6. A human factors approach to effective maintenance

    International Nuclear Information System (INIS)

    Penington, J.; Shakeri, S.

    2006-01-01

    Traditionally in the field of Human Factors within the nuclear industry, the focus has been to identify the potential for human errors in operating tasks, and develop strategies to prevent their occurrence, provide recovery mechanisms, and mitigate the consequences of error as appropriate. Past experience has demonstrated however a significant number of human errors within the nuclear industry occur during maintenance tasks. It is for this reason, and the fact that our nuclear power plants are ageing and increasingly in need of maintenance, that the industry must pay more attention to maintenance tasks. The purpose of this paper is to present a framework for effective maintenance programs, and based upon this framework discuss an approach (an audit tool) that can be used to both design such a program, and to assess existing programs. In addition, this tool can form the basis of cost benefit decisions relating to priorities for improvements to existing programs. (author)

  7. Accounting for anthropic energy flux of traffic in winter urban road surface temperature simulations with TEB model

    Science.gov (United States)

    Khalifa, A.; Marchetti, M.; Bouilloud, L.; Martin, E.; Bues, M.; Chancibaut, K.

    2015-06-01

    A forecast of the snowfall helps winter coordination operating services, reducing the cost of the maintenance actions, and the environmental impacts caused by an inappropriate use of de-icing. In order to determine the possible accumulation of snow on pavement, the forecast of the road surface temperature (RST) is mandatory. Physical numerical models provide such forecast, and do need an accurate description of the infrastructure along with meteorological parameters. The objective of this study was to build a reliable urban RST forecast with a detailed integration of traffic in the Town Energy Balance (TEB) numerical model for winter maintenance. The study first consisted in generating a physical and consistent description of traffic in the model with all the energy interactions, with two approaches to evaluate the traffic incidence on RST. Experiments were then conducted to measure the traffic effect on RST increase with respect to non circulated areas. These field data were then used for comparison with forecast provided by this traffic-implemented TEB version.

  8. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Deckman, M.

    1991-01-01

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  9. Recurrent selection on the Winters sex-ratio genes in Drosophila simulans.

    Science.gov (United States)

    Kingan, Sarah B; Garrigan, Daniel; Hartl, Daniel L

    2010-01-01

    Selfish genes, such as meiotic drive elements, propagate themselves through a population without increasing the fitness of host organisms. X-linked (or Y-linked) meiotic drive elements reduce the transmission of the Y (X) chromosome and skew progeny and population sex ratios, leading to intense conflict among genomic compartments. Drosophila simulans is unusual in having a least three distinct systems of X chromosome meiotic drive. Here, we characterize naturally occurring genetic variation at the Winters sex-ratio driver (Distorter on the X or Dox), its progenitor gene (Mother of Dox or MDox), and its suppressor gene (Not Much Yang or Nmy), which have been previously mapped and characterized. We survey three North American populations as well as 13 globally distributed strains and present molecular polymorphism data at the three loci. We find that all three genes show signatures of selection in North America, judging from levels of polymorphism and skews in the site-frequency spectrum. These signatures likely result from the biased transmission of the driver and selection on the suppressor for the maintenance of equal sex ratios. Coalescent modeling indicates that the timing of selection is more recent than the age of the alleles, suggesting that the driver and suppressor are coevolving under an evolutionary "arms race." None of the Winters sex-ratio genes are fixed in D. simulans, and at all loci we find ancestral alleles, which lack the gene insertions and exhibit high levels of nucleotide polymorphism compared to the derived alleles. In addition, we find several "null" alleles that have mutations on the derived Dox background, which result in loss of drive function. We discuss the possible causes of the maintenance of presence-absence polymorphism in the Winters sex-ratio genes.

  10. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  11. FORMATION OF HYGROTHERMAL CONDITIONS IN A DEEP-LITTER BARN IN A WINTER SEASON

    Directory of Open Access Journals (Sweden)

    Paweł Sokołowski

    2016-09-01

    Full Text Available In free stall, the maintenance of animals in the deep litter, the measurements of temperature and relative humidity of indoor air, temperature and relative humidity of the outside air were conducted. Observation also covered the thermal conditions of litter and its thickness. The study covered the winter period from 1st of December to 28th of February. The study showed that during the winter there is a slight risk of unfavorable thermal conditions for dairy cattle in the barn. The analysis of the obtained results showed a significant effect of the number of animals present in the barn on thermal conditions and humidity. The increase in stocking density in the barn affects the increase of the internal temperature and relative humidity.

  12. Proactive maintenance initiatives at Argonne National Laboratory-West

    International Nuclear Information System (INIS)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-01-01

    In the late 1980's, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ''mentor'' roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I ampersand C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned

  13. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  14. Demonstration of Sensor Data Integration Across Naval Aviation Maintenance

    Science.gov (United States)

    2018-02-01

    Concepts, Programs and Processes; Maintenance Unit Department, Division Organization; Manpower Management ; and Aviation Officers.” http...Naval Aviation Maintenance Alejandra Jolodosky and Adi Zolotov February 2018 This work was performed under Federal Government Contract...underutilized sensor data. CNA proposed a pilot program that integrated sensor data across maintenance levels to expedite repairs of aviation parts

  15. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  16. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1998-01-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  17. Remote maintenance development for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Shibanuma, Kiyoshi

    1998-04-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  18. Evaluating Behaviorally Oriented Aviation Maintenance Resource Management (MRM) Training and Programs: Methods, Results, and Conclusions

    Science.gov (United States)

    Taylor, James C.; Thomas, Robert L., III

    2003-01-01

    Assessment of the impact of Aviation Resource Management Programs on aviation culture and performance has compelled a considerable body of research (Taylor & Robertson, 1995; Taylor, 1998; Taylor & Patankar, 2001). In recent years new methods have been applied to the problem of maintenance error precipitated by factors such as the need for self-assessment of communication and trust. The present study - 2002 -- is an extension of that past work. This research project was designed as the conclusion of a larger effort to help understand, evaluate and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2002, three issues were addressed. First, the evaluation of two (independent & different) MRM programs for changing behaviors was undertaken. In one case we were able to further apply the approach to measuring written communication developed during 2001 (Taylor, 2002; Taylor & Thomas, 2003). Second, the MRM/TOQ surveys were made available for completion on the internet. The responses from these on-line surveys were automatically linked to a results calculator (like the one developed and described in Taylor, 2002) to aid industry users in analyzing and evaluating their local survey data on the internet. Third, the main trends and themes from our research about MRM programs over the past dozen years were reviewed.

  19. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  20. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  1. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.

    As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types...... is described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  2. Assessing winter cover crop nutrient uptake efficiency using a water quality simulation model

    Science.gov (United States)

    Yeo, In-Young; Lee, Sangchui; Sadeghi, Ali M.; Beeson, Peter C.; Hively, W. Dean; McCarty, Greg W.; Lang, Megan W.

    2013-01-01

    Winter cover crops are an effective conservation management practice with potential to improve water quality. Throughout the Chesapeake Bay Watershed (CBW), which is located in the Mid-Atlantic US, winter cover crop use has been emphasized and federal and state cost-share programs are available to farmers to subsidize the cost of winter cover crop establishment. The objective of this study was to assess the long-term effect of planting winter cover crops at the watershed scale and to identify critical source areas of high nitrate export. A physically-based watershed simulation model, Soil and Water Assessment Tool (SWAT), was calibrated and validated using water quality monitoring data and satellite-based estimates of winter cover crop species performance to simulate hydrological processes and nutrient cycling over the period of 1991–2000. Multiple scenarios were developed to obtain baseline information on nitrate loading without winter cover crops planted and to investigate how nitrate loading could change with different winter cover crop planting scenarios, including different species, planting times, and implementation areas. The results indicate that winter cover crops had a negligible impact on water budget, but significantly reduced nitrate leaching to groundwater and delivery to the waterways. Without winter cover crops, annual nitrate loading was approximately 14 kg ha−1, but it decreased to 4.6–10.1 kg ha−1 with winter cover crops resulting in a reduction rate of 27–67% at the watershed scale. Rye was most effective, with a potential to reduce nitrate leaching by up to 93% with early planting at the field scale. Early planting of winter cover crops (~30 days of additional growing days) was crucial, as it lowered nitrate export by an additional ~2 kg ha−1 when compared to late planting scenarios. The effectiveness of cover cropping increased with increasing extent of winter cover crop implementation. Agricultural fields with well-drained soils

  3. A knowledge-based assistant for valve maintenance planning

    International Nuclear Information System (INIS)

    Winter, M.J.; Danofsky, R.A.; Spinrad, B.I.; Howard, K.

    1987-01-01

    A knowledge-based program is being developed to assist engineers in maintenance planning for safety related, motor-operated valves at a boiling water reactor. The purpose of this project is to develop the general framework for a prototype system that demonstrates the capabilities for diagnosing valve symptoms and prescribing corrective maintenance, completing a portion of the Corrective Maintenance Action Request (CMAR) form which must be prepared for each job, and managing an interactive valve data base. Minimizing user input and providing output in a form that is familiar to the maintenance planning engineer are important goals for the program. This paper describes the present features of the valve maintenance advisory system which is currently being tested

  4. Maintenance Of The EPS 3000 Electron Beam Machine As Part Of Quality Assurance Program For Irradiation Service At ALURTRON, Nuclear Malaysia

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shari Jahar; Ayub Muhammad; Azmi Ali; Abdul Basit Shafiei; Sarada Idris

    2012-01-01

    The EPS 3000 electron beam machine is the first of its kind in the country and was installed in Nuclear Malaysia in 1991. It was manufactured by Nissin High Voltage having variable energies from 0.5 to 3.0 MeV and maximum power of 90 kW. The machine is currently used for commercial irradiation that serves local industries. The Alurtron facility where the EPS is housed is an ISO 9000 certified plant. Maintenance program for the EPS is an essential part of Alurtron's Quality Assurance program. This is to ensure that the machine is in good condition and can serve the customer as the demand requires. Preventive maintenance is carried out at scheduled period based on recommendation of the machine's manufacturer. Corrective maintenance and repairs are carried out in-house by Alurtron's technical staff. Assistance may be sought from the manufacturer if necessary. Over the years, Alurtron had built its own capabilities in term of operation and maintenance of Cockcroft Walton type electron beam machine. (author)

  5. Winters fuels report

    International Nuclear Information System (INIS)

    1995-01-01

    The outlook for distillate fuel oil this winter is for increased demand and a return to normal inventory patterns, assuming a resumption of normal, cooler weather than last winter. With industrial production expected to grow slightly from last winter's pace, overall consumption is projected to increase 3 percent from last winter, to 3.4 million barrels per day during the heating season (October 1, 1995-March 31, 1996). Much of the supply win come from stock drawdowns and refinery production. Estimates for the winter are from the Energy Information Administration's (EIA) 4th Quarter 1995 Short-Tenn Energy Outlook (STEO) Mid-World Oil Price Case forecast. Inventories in place on September 30, 1995, of 132 million barrels were 9 percent below the unusually high year-earlier level. Inventories of high-sulfur distillate fuel oil, the principal type used for heating, were 13 percent lower than a year earlier. Supply problems are not anticipated because refinery production and the ready availability of imports should be adequate to meet demand. Residential heating off prices are expected to be somewhat higher than last winter's, as the effects of lower crude oil prices are offset by lower distillate inventories. Heating oil is forecast to average $0.92 per gallon, the highest price since the winter of 1992-93. Diesel fuel (including tax) is predicted to be slightly higher than last year at $1.13 per gallon. This article focuses on the winter assessment for distillate fuel oil, how well last year's STEO winter outlook compared to actual events, and expectations for the coming winter. Additional analyses include regional low-sulfur and high-sulfur distillate supply, demand, and prices, and recent trends in distillate fuel oil inventories

  6. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  7. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M; Anderson, D P [Spectro Incorporated, Littleton, Massachusetts (United States)

    1998-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  8. Machine and lubricant condition monitoring for extended equipment lifetimes and predictive maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Lukas, M.; Anderson, D.P. [Spectro Incorporated, Littleton, Massachusetts (United States)

    1997-12-31

    Predictive maintenance has gained wide acceptance as a cost cutting strategy in modern industry. Condition monitoring by lubricant analysis is one of the basic tools of a predictive maintenance program along with vibration monitoring, performance monitoring and thermography. In today`s modern power generation, manufacturing, refinery, transportation, mining, and military operations, the cost of equipment maintenance, service, and lubricants are ever increasing. Parts, labor, equipment downtime and lubricant prices and disposal costs are a primary concern in a well run maintenance management program. Machine condition monitoring based on oil analysis has become a prerequisite in most maintenance programs. Few operations can afford not to implement a program if they wish to remain competitive, and in some cases, profitable. This presentation describes a comprehensive Machine Condition Monitoring Program based on oil analysis. Actual operational condition monitoring programs will be used to review basic components and analytical requirements. Case histories will be cited as examples of cost savings, reduced equipment downtime and increased efficiencies of maintenance programs through a well managed oil analysis program. (orig.)

  9. Gentilly 2 maintenance in a total quality environment

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M H; Marois, H [Hydro-Quebec, Gentilly (Canada). Gentilly Generating Station

    1993-12-31

    Comprehensive preventive maintenance programs at Gentilly-2 Nuclear Generating Station are based on a policy that seeks to balance requirements against resources. A commitment to total quality aims at performance improvement and total customer satisfaction. To improve overall performance to an annual availability factor of 90%, planned outages must be limited to 21 days per year, and the preventive maintenance program must be upgraded. A quality improvement team is involved in supporting this initiative. This team will seek to bring a new balance to the program, and eventually optimize it, using reliability-centred maintenance techniques. 24 figs.

  10. Systems Sustainability: Implementation of Enhanced Maintenance Programs at the Kurchatov Institute, the All-Russian Research Institute of Experimental physics (VNIIEF) and the All-Russian Scientific Institute for Technical Physics (VNIITF)

    International Nuclear Information System (INIS)

    Coppinger, M.; Pikula, M.; Randolph, J.D.; Windham, M.

    1999-01-01

    Implementation of quality maintenance programs is essential to enhancing sustainable continuous operations of United States funded Materials Protection, Control and Accountability (MPC and A) equipment/systems upgrades at various Russian nuclear facilities. An effective maintenance program is expected to provide assurances to both parties for achieving maximum continuous systems operations with minimum down time. To be effective, the program developed must focus on minimum down time for any part of a system. Minimum down time is realized through the implementation of a quality maintenance program that includes preventative maintenance, necessary diagnostic tools, properly trained technical staff, and an in-house inventory of required spare parts for repairing the impacted component of the system. A centralized maintenance management program is logistically essential for the success of this effort because of the large volume of MPC and A equipment/systems installed at those sites. This paper will discuss current programs and conditions at the Russian Research Center-Kurchatov Institute, the All-Russian Scientific Institute for Technical Physics and the All-Russian Research Institute of Experimental Physics and will address those steps necessary to implement an upgraded program at those sites

  11. 40 CFR 68.56 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.56 Maintenance. (a) The owner or operator shall prepare and implement procedures to maintain the on-going mechanical integrity of the process...

  12. 25 CFR 170.812 - What is emergency maintenance?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is emergency maintenance? 170.812 Section 170.812 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.812 What is emergency maintenance? Emergency maintenance is work that...

  13. Assessing winter cover crop nutrient uptake efficiency using a water quality simulation model

    OpenAIRE

    Yeo, I.-Y.; Lee, S.; Sadeghi, A. M.; Beeson, P. C.; Hively, W. D.; McCarty, G. W.; Lang, M. W.

    2014-01-01

    Winter cover crops are an effective conservation management practice with potential to improve water quality. Throughout the Chesapeake Bay watershed (CBW), which is located in the mid-Atlantic US, winter cover crop use has been emphasized, and federal and state cost-share programs are available to farmers to subsidize the cost of cover crop establishment. The objective of this study was to assess the long-term effect of planting winter cover crops to improve water quality a...

  14. Systematization of Angra-1 operation attendance - Maintenance and periodic testings

    International Nuclear Information System (INIS)

    Furieri, E.B.; Carvalho Bruno, N. de; Salaverry, N.A.

    1988-01-01

    A maintenance analysis, their types and their functions for the safety of nuclear power plants is done. Programs and present trends in the reactor maintenance, as well as the maintenance program and periodic tests of Angra I, are analysed. The necessities of safety analysis and a systematization for maintenance attendance are discussed and the periodic testing as well as the attendance of international experience. (M.C.K.) [pt

  15. 49 CFR 214.341 - Roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Roadway maintenance machines. 214.341 Section 214... Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  16. Winter to winter recurrence of atmospheric circulation anomalies over East Asia and its impact on winter surface air temperature anomalies.

    Science.gov (United States)

    Zhao, Xia; Yang, Guang

    2017-01-01

    The persistence of atmospheric circulation anomalies over East Asia shows a winter to winter recurrence (WTWR) phenomenon. Seasonal variations in sea level pressure anomalies and surface wind anomalies display significantly different characteristics between WTWR and non-WTWR years. The WTWR years are characterized by the recurrence of both a strong (weak) anomalous Siberian High and an East Asian winter monsoon over two successive winters without persistence through the intervening summer. However, anomalies during the non-WTWR years have the opposite sign between the current and ensuing winters. The WTWR of circulation anomalies contributes to that of surface air temperature anomalies (SATAs), which is useful information for improving seasonal and interannual climate predictions over East Asia and China. In the positive (negative) WTWR years, SATAs are cooler (warmer) over East Asia in two successive winters, but the signs of the SATAs are opposite in the preceding and subsequent winters during the non-WTWR years.

  17. Control maintenance training program for special safety systems at Bruce B

    International Nuclear Information System (INIS)

    Reinwald, G.

    1997-01-01

    It was recognized from the early days of commissioning of Bruce B that Control Maintenance staff would require a level of expertise to be able to maintain Special Safety Systems in proper running order. In the early 80's this was achieved through hands on experience during the original commissioning, troubleshooting and placing of the various systems in service. Control maintenance procedures were developed and implemented as the new systems came available for commissioning, as were operating manuals,training manuals etc. Under the development of the Maintenance Manager, a Conduct of Maintenance section was organized. One of the responsibilities of this section was to develop a series of Maintenance Administrative Procedures (MAPs) that set the standards for maintenance activities including training

  18. Evaluation of winter temperatures on apple budbreak using grafted twigs

    Directory of Open Access Journals (Sweden)

    Fernando José Hawerroth

    2013-09-01

    Full Text Available Temperature is the main climate factor related to induction, maintenance and dormancy release in apple (Malus domestica Borkh.. The inadequate chilling exposure in apples causes budbreak problems, resulting in decrease in yield potential. Thus, the knowledge of physiological principles and environmental factors determining the dormancy phenomenon, especially winter temperature effects, it is necessary for the efficient selection of cultivars in a productive region. In addition, it is indispensable to adapt the orchard management aiming to decrease the problems caused by lack chilling during winter. The objective of this study was to evaluate the influence of different thermal conditions during the dormancy period on budbreak of apple cultivars. One-year-old twigs of 'Castel Gala' and 'Royal Gala' cultivars, grafted on M7 rootstock, were submitted to temperatures of 5, 10 and 15ºC for different exposure periods (168; 336; 672; 1,008 and 1,344 hours. After treatments execution, the plants were kept in a greenhouse at 25ºC. Budbreak was quantified when accumulated 3,444; 6,888; 10,332; 13,776; 17,220 and 20,664 GDHºC after temperature treatments. The cultivars responded differently to temperature effect during the winter period. The temperature of 15ºC during winter shows a greater effectiveness on 'Castel Gala' apple budbreak while in the 'Royal Gala' apples the temperatures of 5 and 10ºC show better performance. 'Castel Gala' cultivar (low chilling requirement may supply its physiological necessities, may be capable to budburst, even when subjected to higher temperatures in relation to 'Royal Gala' apples (high chilling requirement.

  19. Road Maintenance and Rehabilitation Program Using Functional and Structural Assessment

    Science.gov (United States)

    Setianingsih, A. I.; Sangaji, S.; Setyawan, A.

    2017-02-01

    Road sector development policy in Bangka Belitung emphasis on equitable development, which is opening up new areas for industrial development zones of potential marine and coastal tourism, so that having an impact on the budget priority to build a new road. This led to a minimal budget provided for the maintenance of the existing road. This study aimed to evaluate the condition of the pavement both functionally and structurally, the growth of traffic density and the availability of existing road maintenance costs. Then, to analyze the influence of existing road conditions, traffic density and road maintenance costs to the type of road maintenance management. The results are compared with the results of the existing maintenance conducted by the Public Works Department of Bangka Belitung province. Evaluation of pavement conditions consists of visual assessment of pavement condition using IRI, pavement condition assessment functionally with deflection method using test data tool Benkelman Beam (BB) and the actual traffic load. IRI value, deflections and traffic growth gained from years 2011-2015 subsequently created regression models to obtain the relationship and the correlation coefficient. The analysis showed that using the same relative magnitude of the budget from 2011 to 2015, giving priority to the maintenance of the road with good conditions capable of providing the road with a steady state of 100%. Recommendations can be given that maintain the road with good conditions reflecting that preservation provide maximum results with the more efficient maintenance cost.

  20. Comparing Weight Loss-Maintenance Outcomes of a Worksite-Based Lifestyle Program Delivered via DVD and Face-to-Face: A Randomized Trial.

    Science.gov (United States)

    Ing, Claire Townsend; Miyamoto, Robin E S; Fang, Rui; Antonio, Mapuana; Paloma, Diane; Braun, Kathryn L; Kaholokula, Joseph Keawe'aimoku

    2018-03-01

    Native Hawaiians and other Pacific Islanders have high rates of overweight and obesity compared with other ethnic groups in Hawai'i. Effective weight loss and weight loss-maintenance programs are needed to address obesity and obesity-related health inequities for this group. Compare the effectiveness of a 9-month, worksite-based, weight loss-maintenance intervention delivered via DVD versus face-to-face in continued weight reduction and weight loss maintenance beyond the initial weight loss phase. We tested DVD versus face-to-face delivery of the PILI@Work Program's 9-month, weight loss-maintenance phase in Native Hawaiian-serving organizations. After completing the 3-month weight loss phase, participants ( n = 217) were randomized to receive the weight loss-maintenance phase delivered via trained peer facilitators or DVDs. Participant assessments at randomization and postintervention included weight, height, blood pressure, physical functioning, exercise frequency, and fat intake. Eighty-three face-to-face participants were retained at 12 months (74.1%) compared with 73 DVD participants (69.5%). There was no significant difference between groups in weight loss or weight loss maintenance. The number of lessons attended in Phase 1 of the intervention (β = 0.358, p = .022) and baseline systolic blood pressure (β = -0.038, p = .048) predicted percent weight loss at 12 months. Weight loss maintenance was similar across groups. This suggests that low-cost delivery methods for worksite-based interventions targeting at-risk populations can help address obesity and obesity-related disparities. Additionally, attendance during the weight loss phase and lower baseline systolic blood pressure predicted greater percent weight loss during the weight loss-maintenance phase, suggesting that early engagement and initial physical functioning improve long-term weight loss outcomes.

  1. Polar vortex evolution during Northern Hemispheric winter 2004/05

    Directory of Open Access Journals (Sweden)

    T. Chshyolkova

    2007-06-01

    Full Text Available As a part of the project "Atmospheric Wave Influences upon the Winter Polar Vortices (0–100 km" of the CAWSES program, data from meteor and Medium Frequency radars at 12 locations and MetO (UK Meteorological Office global assimilated fields have been analyzed for the first campaign during the Northern Hemispheric winter of 2004/05. The stratospheric state has been described using the conventional zonal mean parameters as well as Q-diagnostic, which allows consideration of the longitudinal variability. The stratosphere was cold during winter of 2004/05, and the polar vortex was relatively strong during most of the winter with relatively weak disturbances occurring at the end of December and the end of January. For this winter the strongest deformation with the splitting of the polar vortex in the lower stratosphere was observed at the end of February. Here the results show strong latitudinal and longitudinal differences that are evident in the stratospheric and mesospheric data sets at different stations. Eastward winds are weaker and oscillations with planetary wave periods have smaller amplitudes at more poleward stations. Accordingly, the occurrence, time and magnitude of the observed reversal of the zonal mesospheric winds associated with stratospheric disturbances depend on the local stratospheric conditions. In general, compared to previous years, the winter of 2004/05 could be characterized by weak planetary wave activity at stratospheric and mesospheric heights.

  2. Development of a methodology for maintenance optimization at Kozloduy NPP

    International Nuclear Information System (INIS)

    Kitchev, E.

    1997-01-01

    The paper presents the overview of a project for development of an applicable strategy and methods for Kozloduy NPP (KNPP) to optimize its maintenance program in order to meet the current risk based maintenance requirements. The strategy in a format of Integrated Maintenance Program (IMP) manual will define the targets of the optimization process, the major stages and elements of this process and their relationships. IMP embodies the aspects of the US NRC Maintenance Rule compliance and facilitates the integration of KNPP programs and processes which impact the plant maintenance and safety. The methods in a format of IMP Instructions (IM-PI) will define how the different IMP stages can be implemented and the IMP targets can be achieved at KNPP environment. (author). 8 refs

  3. Migration and winter distribution of the Chestnutcollared Longspur

    Directory of Open Access Journals (Sweden)

    Ellison Kevin

    2017-12-01

    Full Text Available The Chestnut-collared Longspur (Calcarius ornatus is one of five grassland songbirds, endemic within North America, with populations that have declined >65% since the 1960s. These species breed and winter in the northern and southern Great Plains, respectively. Identifying migration routes, wintering sites, and the timing of their habitat use is key for understanding the relative magnitude of threats across the annual cycle and effectively targeting habitats for conservation. We tracked migratory movements of seven Chestnut-collared Longspurs with light-level geolocators deployed in Canada. Individuals wintered up to 112-1,200km apart. All followed the Central Flyway, circumvented high-elevation terrain, and traveled east of the breeding location. Unlike most songbirds, the durations of spring and fall migrations were similar; on average 42 ± 7d and 41 ± 5d during fall and spring migrations, respectively, for an approximately 2,000km migration; this highlights the need to better understand habitat requirements during migration for grassland songbirds. Using geospatial habitat data, we assessed winter distribution overlap with four other endemic grassland songbirds; wintering range overlapped 63-99%. Future studies should use more precise devices (e.g., archival GPS units, programmed for data collection dates from this study, to identify specific migratory sites for better conserving this and associated grassland species.

  4. FY 1994 annual summary report of the surveillance and maintenance activities for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-11-01

    The Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program was initiated to manage former waste management and environmental research sites contaminated with radioactive materials and/or hazardous chemicals. The S and M Program is responsible for managing designated sites/facilities from the end of their operating lives until final disposition or site stabilization. To effectively manage and perform the various S and M Program responsibilities, five summary-level work breakdown structure (WBS) elements have been established: S and M Preliminary Investigations, Special Projects, Routine S and M, Inactive Groundwater Wells, and Project Management. Routine S and M activities were conducted as scheduled throughout fiscal years (FY) 1994 at applicable inactive waste management (WM) and other contaminated areas. Overall, the ER S and M Program maintains 47 facilities, performs vegetation maintenance on approximately 230 acres, maintains 54 inactive tanks, and provides overall site management on over 700 acres. In addition to the routine S and M activities, detailed site inspections were conducted at established frequencies on appropriate sites in the ER S and M Program. This document provides a summary of the FY 1994 ORNL ER S and M Program accomplishments

  5. Establishing a predictive maintenance (PdM) program at the Hanford Site

    International Nuclear Information System (INIS)

    Murray, W.A.; Winslow, R.G.

    1994-02-01

    The production reactors have been shut down for some time. But for the rest of the site, there is currently about 16,000 people engaged in a multi-billion dollar effort to safely process wastes which have been stored at the site since the 1940's. This effort also includes demolition of some older facilities and environmental restoration of much of the site. This is expected to take approximately 30 to 40 years. The concept of a site-wide predictive maintenance (PdM) program began to form in early 1993. Several informal studies showed that the stand alone predictive maintenance groups which had prevailed on site to date were less than 15% effective at trending equipment conditions and predicting failures. To improve the effectiveness of PdM within the company, an engineering analysis by Rick Winslow confirmed that utilization of software networking technology which was now available would significantly overcome many of these built in handicaps. A site-wide predictive maintenance network would make PdM technology accessible to all of the areas and facilities at the site regardless of geographical distances and company division lines. Site resident vibration experts can easily be located and provide consultations on the network. However, it was recognized that strong leadership and management skills would be required within each of the two organizations for effective implementation. To start this process, a letter of understanding and agreement between the facilities and Tank Farm divisions was drafted and endorsed by company management. The agreement assigned the primary responsibility of acquiring the network software and licensee to the Tank Farms division. The acquisition and installation of the network server would be the responsibility of the facilities division. This paper describes the rest of the network development and implementation process

  6. Winter is losing its cool

    Science.gov (United States)

    Feng, S.

    2017-12-01

    Winter seasons have significant societal impacts across all sectors ranging from direct human health to ecosystems, transportation, and recreation. This study quantifies the severity of winter and its spatial-temporal variations using a newly developed winter severity index and daily temperature, snowfall and snow depth. The winter severity and the number of extreme winter days are decreasing across the global terrestrial areas during 1901-2015 except the southeast United States and isolated regions in the Southern Hemisphere. These changes are dominated by winter warming, while the changes in daily snowfall and snow depth played a secondary role. The simulations of multiple CMIP5 climate models can well capture the spatial and temporal variations of the observed changes in winter severity and extremes during 1951-2005. The models are consistent in projecting a future milder winter under various scenarios. The winter severity is projected to decrease 60-80% in the middle-latitude Northern Hemisphere under the business-as-usual scenario. The winter arrives later, ends earlier and the length of winter season will be notably shorter. The changes in harsh winter in the polar regions are weak, mainly because the warming leads to more snowfall in the high latitudes.

  7. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  8. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  9. Tandem mirror next step: remote maintenance

    International Nuclear Information System (INIS)

    Doggett, J.N.; Damm, C.C.; Hanson, C.L.

    1980-01-01

    This study of the next proposed experiment in the Mirror Fusion Program, the Tandem Mirror Next Step (TMNS), has included serious consideration of the maintenance requirements of such a large source of high energy neutrons with its attendant throughput of tritium. Although maintenance will be costly in time and money, our conclusion is that with careful attention to a design for maintenance plan such a device can be reliably operated

  10. Aging based maintenance and reinvestment scheduling of electric distribution

    Energy Technology Data Exchange (ETDEWEB)

    Korpijarvi, J.

    2012-07-01

    The maintenance of electric distribution network is a topical question for distribution system operators because of increasing significance of failure costs. In this dissertation the maintenance practices of the distribution system operators are analyzed and a theory for scheduling maintenance activities and reinvestment of distribution components is created. The scheduling is based on the deterioration of components and the increasing failure rates due to aging. The dynamic programming algorithm is used as a solving method to maintenance problem which is caused by the increasing failure rates of the network. The other impacts of network maintenance like environmental and regulation reasons are not included to the scope of this thesis. Further the tree trimming of the corridors and the major disturbance of the network are not included to the problem optimized in this thesis. For optimizing, four dynamic programming models are presented and the models are tested. Programming is made in VBA-language to the computer. For testing two different kinds of test networks are used. Because electric distribution system operators want to operate with bigger component groups, optimal timing for component groups is also analyzed. A maintenance software package is created to apply the presented theories in practice. An overview of the program is presented (orig.)

  11. Maintenance Issues in Long Term Operation of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Contri, P.; Bieth, M.; Rieg, C.

    2006-01-01

    Due to current social and economical framework, in last years many nuclear power plant owners started a program for the Long Term Operation (LTO)/PLEX (Plant Life Extension) of their older nuclear facilities. This process has many nuclear safety implications, other than strategic and political ones. The need for tailoring the available safety assessment tools to such applications has become urgent in recent years and triggered many research actions. The review of regular maintenance and ageing management programs are tools widely used in LTO/PLEX context in many Countries. However, most of these tools are rather general and in many cases they need reshaping in an LTO/PLEX framework before application, with focus to the safety implications of the LTO/PLEX. Many Countries and plants radically modified their maintenance rules towards a condition based approach as a precondition for the implementation of LTO/PLEX programs. In 2004 a network of European Organisations operating Nuclear Power Plants, SENUF, under the coordination of the JRC-IE, carried out an extensive questionnaire on maintenance practice in their facilities aiming at capturing the aspects of the maintenance programs where research is mostly needed. This paper uses some results of the questionnaire, which was not oriented to LTO/PLEX, to draw some conclusions on how the current maintenance programs could support a potential LTO/PLEX, among the other programs running at NPPs. In this sense, it is spin-off of the SENUF WG on maintenance. The paper aims at identifying the technical attributes of the maintenance programs more directly affecting the decision for a long-term safe operation of a nuclear facility, the issues related to their implementation and safety review. The paper includes an analysis of the questionnaire circulated among the SENUF participants and a discussion on the implications of optimised maintenance programs in existing plants. Some examples at WWER plants taken by sources other than

  12. Optimization of maintenance programme at Daya Bay Nuclear Power Station based on RCM analysis results

    International Nuclear Information System (INIS)

    Liu Min

    2003-01-01

    This paper begins with an introduction to Guangdong Daya Bay Nuclear Power Station (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic testing program are continuously modified and optimized, new on-condition maintenance technologies are introduced, non-productive scheduled overhauls are discarded, maintenance costs are effectively controlled, maintenance appropriateness has improved, management of hidden failures is more effective and timely. It will show the benefit of greater equipment reliability brought about by all of these changes, which in turn increases the reliability and safety of the entire power station. (author)

  13. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  14. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1995-01-01

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  15. Proceedings of the third international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately.

  16. Equipment reliability process improvement and preventive maintenance optimization

    International Nuclear Information System (INIS)

    Darragi, M.; Georges, A.; Vaillancourt, R.; Komljenovic, D.; Croteau, M.

    2004-01-01

    The Gentilly-2 Nuclear Power Plant wants to optimize its preventive maintenance program through an Integrated Equipment Reliability Process. All equipment reliability related activities should be reviewed and optimized in a systematic approach especially for aging plants such as G2. This new approach has to be founded on best practices methods with the purpose of the rationalization of the preventive maintenance program and the performance monitoring of on-site systems, structures and components (SSC). A rational preventive maintenance strategy is based on optimized task scopes and frequencies depending on their applicability, critical effects on system safety and plant availability as well as cost-effectiveness. Preventive maintenance strategy efficiency is systematically monitored through degradation indicators. (author)

  17. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1997-01-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  18. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  19. Airline experience with reliability-centered maintenance

    International Nuclear Information System (INIS)

    Matteson, T.D.

    1985-01-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.)

  20. Airline experience with reliability-centered maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Matteson, T.D.

    1985-11-01

    Reliability-Centered Maintenance is a process for developing preventive maintenance programs. Its concepts evolved from the post WWII experience of the airline community. Its genesis was in a paper by F. Stanley Nowlan and Thomas D. Matteson of United Airlines for the American Institute of Aeronautics and Astronautics in 1967. Its first application was to the Boeing 747. It has subsequently been adopted by the FAA and the Department of Defense and applied to many new transport and military aircraft. Its objective is applicable and effective preventive maintenance and it has proven to be a highly effective replacement for the prior intuitive processes for selective preventive maintenance tasks. It focuses on system functions, functional failures, then dominant failure modes and effects. It then uses a decision tree to classify failure criticality and identify applicable and effective tasks. The result is a program focused on maintaining inherent safety and reliability at minimum cost. (orig.).

  1. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  2. Accounting for anthropic energy flux of traffic in winter urban road surface temperature simulations with the TEB model

    Science.gov (United States)

    Khalifa, A.; Marchetti, M.; Bouilloud, L.; Martin, E.; Bues, M.; Chancibaut, K.

    2016-02-01

    Snowfall forecasts help winter maintenance of road networks, ensure better coordination between services, cost control, and a reduction in environmental impacts caused by an inappropriate use of de-icers. In order to determine the possible accumulation of snow on pavements, forecasting the road surface temperature (RST) is mandatory. Weather outstations are used along these networks to identify changes in pavement status, and to make forecasts by analyzing the data they provide. Physical numerical models provide such forecasts, and require an accurate description of the infrastructure along with meteorological parameters. The objective of this study was to build a reliable urban RST forecast with a detailed integration of traffic in the Town Energy Balance (TEB) numerical model for winter maintenance. The study first consisted in generating a physical and consistent description of traffic in the model with two approaches to evaluate traffic incidence on RST. Experiments were then conducted to measure the effect of traffic on RST increase with respect to non-circulated areas. These field data were then used for comparison with the forecast provided by this traffic-implemented TEB version.

  3. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  4. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  5. New winter hardy winter bread wheat cultivar (Triticum aestivum L. Voloshkova

    Directory of Open Access Journals (Sweden)

    Л. М. Голик

    2007-12-01

    Full Text Available Creation of Initial raw for breeding of winter wheat by change of the development type under low temperatures influence was described. Seeds of spring wheat were vernalized in aluminum weighting bottle. By using low temperatures at sawing of M2-6 at the begin ind of optimal terms of sawing of winter wheat, new winter-hardy variety of Voloshkova was bred.

  6. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    Hauer, K.A.; Wilson, J.F.

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  7. Good practices for effective maintenance to manage aging at NPPs

    International Nuclear Information System (INIS)

    Scott, W.B.; Enderlin, W.I.; Levy, I.S.

    1989-01-01

    The Nuclear Regulatory Commission's Office of Nuclear Regulatory Research is sponsoring this effort to study maintenance as it relates to aging, under the Nuclear Plant Aging Research (NPAR). Maintenance is the primary means of combating and correcting the effects of aging degradation at nuclear power plants. Maintenance effectiveness directly affects the safety of nuclear power plants. Several recent plant events have shown that improper maintenance or a lack of maintenance can be a significant contributory cause of plant incidents (e.g., transients at Rancho Seco and Davis Besse, and the Salem anticipated transient without scram event). In these, and other events, safety related plant equipment functions have been impaired by poor maintenance practices or a lack of maintenance on the specific equipment or in ancillary equipment that affects the ability of the safety related equipment to function. In some cases, the ancillary equipment has been nonsafety-related equipment, or balance-of-plant equipment that has not received adequate maintenance attention. In addition to the potential for causing safety significant plant transients, poor or lacking maintenance may allow the licensing basis of the plant to be eroded without detection. In some cases, time-related aging degradation of equipment that has not been detected, corrected or managed by the maintenance program has been a significant contributory factor. The NPAR program has developed significant information on aging degradation, detection, mitigation, and correction practices for safety-significant structures, systems and components that can be factored into maintenance programs and their effectiveness

  8. 33 CFR 100.109 - Winter Harbor Lobster Boat Race, Winter Harbor, ME.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Winter Harbor Lobster Boat Race, Winter Harbor, ME. 100.109 Section 100.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY REGATTAS AND MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.109 Winter Harbor...

  9. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  10. Guide for generic application of Reliability Centered Maintenance (RCM) recommendations

    International Nuclear Information System (INIS)

    Schwan, C.A.; Toomey, G.E.; Morgan, T.A.; Darling, S.S.

    1991-02-01

    Previously completed reliability centered maintenance (RCM) studies form the basis for developing or refining a preventive maintenance program. This report describes a generic methodology that will help utilities optimize nuclear plant maintenance programs using RCM techniques. This guide addresses the following areas: history of the generic methodology development process, and use of the generic methodology for conducting system-to-system and component-to-component evaluations. 2 refs., 2 figs., 5 tabs

  11. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  12. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  13. ATTENTION MAINTENANCE IN NOVICE DRIVERS: ASSESSMENT AND TRAINING

    OpenAIRE

    Pradhan, Anuj; Masserang, Kathleen M.; Divekar, Gautam; Reagan, Ian; Thomas, F. Dennis; Blomberg, Richard; Pollatsek, Alexander; Fisher, Donald

    2009-01-01

    All programs assessing attention maintenance inside the vehicle have required eye trackers and either a driving simulator or a specially equipped field vehicle. Ideally, one would like a way to assess attention maintenance that could be implemented on a desktop PC. Additionally, one would like to have a program that could be used to train novice drivers to maintain their attention more safely on the forward roadway. An experiment was run (a) to determine whether a program FOCAL (Focused Conce...

  14. 40 CFR 160.63 - Maintenance and calibration of equipment.

    Science.gov (United States)

    2010-07-01

    ...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Equipment § 160.63 Maintenance and calibration of..., maintenance, testing, calibration, and/ or standardization of equipment, and shall specify, when appropriate... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Maintenance and calibration of...

  15. Nuclear instrument maintenance - problems, solutions, and obstacles

    International Nuclear Information System (INIS)

    Vuister, P.H.

    1983-01-01

    In 200 laboratories of South-East Asia, Latin America and Africa a survey was made of the state of instrumentation for nuclear medicine. The principal cause of failures and defects was inadequate quality control and preventive maintenance. On the basis of the survey coordinated research programs were compiled for the maintenance of nuclear instruments. The four principal points of the programs are: to safeguard quality and stable electric power supplies for the instruments, to safeguard permanent temperature and humidity in the environment in which the equipment is operated, effective maintenance, and training of personnel. In the years 1981 and 1982, 14 local training courses were run in which emphasis was put on practicals and tests in mechanics and electronics

  16. Metabolic response to lipid infusion in fasting winter-acclimatized king penguin chicks (Aptenodytes patagonicus).

    Science.gov (United States)

    Teulier, Loïc; Tornos, Jérémy; Rouanet, Jean-Louis; Rey, Benjamin; Roussel, Damien

    2013-05-01

    During the cold austral winter, king penguin chicks are infrequently fed by their parents and thus experience severe nutritional deprivation under harsh environmental conditions. These energetic constraints lead to a range of energy sparing mechanisms balanced by the maintenance of efficient thermogenic processes. The present work investigated whether the high thermogenic capacities exhibited by winter-acclimatized king penguin chicks could be related to an increase in lipid substrate supply and oxidation in skeletal muscle, the main site of thermogenesis in birds. To test this hypothesis, we examined i) the effect of an experimental rise in plasma triglyceride on the whole metabolic rate in winter-acclimatized (WA) and de-acclimatized king penguin chicks kept at thermoneutrality (TN), and ii) investigated the fuel preference of muscle mitochondria. In vivo, a perfusion of a lipid emulsion induced a small 10% increase of metabolic rate in WA chicks but not in TN group. In vitro, the oxidation rate of muscle mitochondria respiring on lipid-derived substrate was +40% higher in WA chicks than in TN, while no differences were found between groups when mitochondria oxidized carbohydrate-derived substrate or succinate. Despite an enhanced fuel selection towards lipid oxidation in skeletal muscle, a rise of circulating lipids per se was not sufficient to fully unravel the thermogenic capacity of winter-acclimatized king penguin chicks. Copyright © 2013 Elsevier Inc. All rights reserved.

  17. TPM and autonomous maintenance: case study in a metal mechanic company

    Directory of Open Access Journals (Sweden)

    Norberto Carvalho Biehl

    2015-12-01

    Full Text Available The purpose of this article was to describe a case of autonomous maintenance implementation in a pilot area of a metal mechanical industry company. The TPM – Total Productive Maintenance is a managerial technology that can help companies to reduce failures and breakages of machines. One of the most important issues of TPM is autonomous maintenance. The method of research was the case study. A program of twelve points was structured and adopted as stand-alone maintenance deployment guide. The program began in a pilot area, including three machining centers. The main results of the pilot program were: increasing by more than 700% the Mean Time between Failure, reducing by more than 40% in the Mean Time to Repair, as well as the consequent increase of more than five percentage points on the availability of the three machines and almost 60% reduction in the cost of maintenance materials. The main conclusion was that the TPM, and in particular the autonomous maintenance, can increase the efficiency of maintenance as strategic factor, which enhances the competitiveness of manufacturing in industrial companies.

  18. Methadone Maintenance as Last Resort

    DEFF Research Database (Denmark)

    Järvinen, Margaretha; Miller, Gale

    2010-01-01

    Drawing on qualitative interviews with drug addicts in Copenhagen, Denmark, this article offers a phenomenological reading of a methadone maintenance program. The program is set within the principles of harm reduction, meaning that its aim is not to cure the participants’ addiction but to keep them...

  19. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  20. Pilot Study for Maintenance Rule at KSNP

    International Nuclear Information System (INIS)

    Choi, Kwang Hee; Jeong, Hyeon Jong; Jee, Moon Hak; Hong, Sung Yull

    2005-01-01

    Maintenance Rule (MR), which was developed to monitor the effectiveness of maintenance in a nuclear power plant (NPP), has been received as highly successful program by and large since its implementation in 1996 in the United States. Korea has initiated two pilot programs to implement the Maintenance Rule program in 2003. Selected plants for the pilot implementation are Kori 3 and 4 units and Ulchin 3 and 4 units, where Kori 3 and 4 units are Westinghouse units and Ulchin 3 and 4 units are Korean Standardized Nuclear Power (KSNP) Plant units. This paper describes the results of each key tasks completed to date and insights gained from pilot study on the KSNP units. Currently, Scoping of the functions of maintenance rule and determination of safety significance level have been completed during first year. As first task, total 607 functions were identified and defined by detailed function analysis on 135 systems that cover all plant systems. About 55% of total functions are selected as within the scope of maintenance rule. Among these inscoped functions, 56% of scoped functions are safety related and 44% are non-safety related functions. Evaluation of safety significance for each function was determined by expert panel consist of eight experts in field of plant maintenance, operation, PSA, work schedule and system engineers. As a result, about 46% of functions were determined to be high safety significant functions and rest of the functions were classified as low safety significant. The remaining tasks that are included determination of performance criteria and preparation of implementing guideline will be performed in following years

  1. Variation in the Viral Hepatitis and HIV Policies and Practices of Methadone Maintenance Programs.

    Science.gov (United States)

    Jessop, Amy B; Hom, Jeffrey K; Burke, Monika

    Patients prescribed methadone maintenance treatment (MMT) demonstrate elevated prevalence of hepatitis B virus (HBV), hepatitis C virus, and HIV. Government agencies recommend testing for these infections in MMT programs, but uptake is limited. We audited infection-related policies and practices of all 14 MMT programs in Philadelphia, Pennsylvania, in 2015. Results were tabulated and compared with the results from a 2010 audit of 10 of 12 MMT programs. The audit focused on which patients are tested, timing and frequency, specific tests ordered, vaccination, and communication of test results. Written policies were nonspecific, offering little guidance on appropriate testing. The principal change in policy between 2010 and 2015 involved adding clearer guidance for communication of results to patients. In 2010 and 2015, all MMT programs tested new patients for hepatitis C virus antibodies, although retesting of existing patients varied. HBV testing increased from 2010 to 2015, though it was not uniform, with 5 programs testing for HBV surface antibodies and 10 programs testing for HBV surface antigens. Six programs assessed hepatitis vaccination status, but only 1 administered vaccines. In 2010, city-sponsored HIV antibody testing was available at all MMT programs. Without this program in 2015, few MMT programs conducted HIV testing. Despite limited hepatitis and HIV screening in MMT programs nationally, this study shows that testing can be incorporated into routine procedures. MMT programs are positioned to play an integral role in the identification of patients with chronic infections, but additional guidance and resources are required to maximize their impact.

  2. Preventive maintenance basis: Volume 31 -- Relays -- timing. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to timing relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  3. Preventive maintenance basis: Volume 30 -- Relays -- control. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-07-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to control relays. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  4. Maintenance quality assurance peer exchange 2.

    Science.gov (United States)

    2009-04-01

    This report documents a comprehensive study of twenty three maintenance quality assurance : (MQA) programs throughout the United States and Canada. The policies and standards of : each program were synthesized to create a general assessment on the co...

  5. Autonomous and professional maintenance in metallurgical enterprise as activities within total productive maintenance

    Directory of Open Access Journals (Sweden)

    B. Gajdzik

    2014-04-01

    Full Text Available The content of this publication consists of notions connected with Total Productive Maintenance (TPM in metallurgical enterprise. The basic areas of devices condition management through Autonomous and Professional Maintenance are described here. Mentioned areas of activities are performed in metallurgical enterprise ArcelorMittal Poland within pillars of World Class Manufacturing (WCM. The aims of UR programs are to maintain the basic functionality of the devices and decrease the number of failures in order to reach improvement of production efficiency.

  6. State-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-04-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system. 5 references, 8 figures

  7. Empirical analysis of selected nuclear power plant maintenance factors and plant safety

    International Nuclear Information System (INIS)

    Olson, J.; Osborn, R.N.; Thurber, J.A.; Sommers, P.E.; Jackson, D.H.

    1985-07-01

    This report contains a statistical analysis of the relationship between selected aspects of nuclear power plant maintenance programs and safety related performance. The report identifies a large number of maintenance resources which can be expected to influence maintenance performance and subsequent plant safety performance. The resources for which data were readily available were related statistically to two sets of performance indicators: maintenance intermediate safety indicators and final safety performance indicators. The results show that the administrative structure of the plant maintenance program is a significant predictor of performance on both sets of indicators

  8. Winter Weather Emergencies

    Science.gov (United States)

    Severe winter weather can lead to health and safety challenges. You may have to cope with Cold related health problems, including ... there are no guarantees of safety during winter weather emergencies, you can take actions to protect yourself. ...

  9. Developing a CANDU industry maintenance guide. A 'community of practice' compendium

    International Nuclear Information System (INIS)

    Von Hatten, P.; Hoye, D.S.

    2011-01-01

    The CANDU Owners Group (COG) has initiated a joint utility project to create an Industry Maintenance Guide. The primary goal of the guide is to provide a structured template of activities to implement the maintenance program, based on industry best practices, and with consideration for new regulatory requirements identified in the Canadian Nuclear Safety Commission document S210. The guide will be prepared with a macro view of the maintenance program, which includes core maintenance activities as well as supporting activities and programs in Engineering, Supply Chain and Work Management. Currently there is no such document that solidly links all the requirements to develop, support and execute a maintenance program. Some elements are captured in various industry documents such as INPO documents AP928, Work Management, AP913, Equipment Reliability and AP908, Materials and Services. The guide will not replicate these good practices, but will focus on how they are linked and interrelate to create an optimum program. It is expected that utilities will be able to utilize the guide to take the next incremental step in performance based on cross functional alignment and efficiency.

  10. 40 CFR 57.109 - Maintenance of pay.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Maintenance of pay. 57.109 Section 57.109 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS General § 57.109 Maintenance of pay. The Administrator will not approve...

  11. Comparison of snowpack and winter wet-deposition chemistry in the Rocky Mountains, USA: implications for winter dry deposition

    Science.gov (United States)

    Clow, David W.; Ingersoll, George P.; Mast, M. Alisa; Turk, John T.; Campbell, Donald H.

    Depth-integrated snowpack chemistry was measured just prior to maximum snowpack depth during the winters of 1992-1999 at 12 sites co-located with National Atmospheric Deposition Program/National Trend Network (NADP/NTN) sites in the central and southern Rocky Mountains, USA. Winter volume-weighted mean wet-deposition concentrations were calculated for the NADP/NTN sites, and the data were compared to snowpack concentrations using the paired t-test and the Wilcoxon signed-rank test. No statistically significant differences were indicated in concentrations of SO 42- or NO 3- ( p>0.1). Small, but statistically significant differences ( p⩽0.03) were indicated for all other solutes analyzed. Differences were largest for Ca 2+ concentrations, which on average were 2.3 μeq l -1 (43%) higher in the snowpack than in winter NADP/NTN samples. Eolian carbonate dust appeared to influence snowpack chemistry through both wet and dry deposition, and the effect increased from north to south. Dry deposition of eolian carbonates was estimated to have neutralized an average of 6.9 μeq l -1 and a maximum of 12 μeq l -1 of snowpack acidity at the southernmost sites. The good agreement between snowpack and winter NADP/NTN SO 42- and NO 3- concentrations indicates that for those solutes the two data sets can be combined to increase data density in high-elevation areas, where few NADP/NTN sites exist. This combination of data sets will allow for better estimates of atmospheric deposition of SO 42- and NO 3- across the Rocky Mountain region.

  12. The state-of-the-art Model M-2 Maintenance System

    International Nuclear Information System (INIS)

    Herndon, J.N.; Martin, H.L.; Satterlee, P.E. Jr.; Jelatis, D.G.; Jennrich, C.E.

    1984-01-01

    The Model M-2 Maintenance System is part of an ongoing program within the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) to improve remote manipulation technology for future nuclear fuel reprocessing and other remote applications. Techniques, equipment, and guidelines which can improve the efficiency of remote maintenance are being developed. The Model M-2 Maintenance System, installed in the Integrated Equipment Test (IET) Facility at ORNL, provides a complete, integrated remote maintenance system for the demonstration and development of remote maintenance techniques. The system comprises a pair of force-reflecting servomanipulator arms, television viewing, lighting, and auxiliary lifting capabilities, thereby allowing manlike maintenance operations to be executed remotely within the remote cell mockup area in the IET. The Model M-2 Maintenance System incorporates an upgraded version of the proven Central Research Laboratories' Model M servomanipulator. Included are state-of-the-art brushless dc servomotors for improved performance, remotely removable wrist assemblies, geared azimuth drive, and a distributed microprocessor-based digital control system

  13. Establishing an In-House Wind Maintenance Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  14. The meteorological monitoring audit, preventative maintenance and quality assurance programs at a former nuclear weapons facility

    International Nuclear Information System (INIS)

    Maxwell, D.R.

    1995-01-01

    The purposes of the meteorological monitoring audit, preventative maintenance, and quality assurance programs at the Rocky Flats Environmental Technology Site (Site), are to (1) support Emergency Preparedness (EP) programs at the Site in assessing the transport, dispersion, and deposition of effluents actually or potentially released into the atmosphere by Site operations; and (2) provide information for onsite and offsite projects concerned with the design of environmental monitoring networks for impact assessments, environmental surveillance activities, and remediation activities. The risk from the Site includes chemical and radioactive emissions historically related to nuclear weapons component production activities that are currently associated with storage of large quantities of radionuclides (plutonium) and radioactive waste forms. The meteorological monitoring program provides information for site-specific weather forecasting, which supports Site operations, employee safety, and Emergency Preparedness operations

  15. Field maintenance of radiation-shielding windows at HFEF

    International Nuclear Information System (INIS)

    Tobias, D.A.

    1983-01-01

    The achievement of excellent viewing through hot-cell shielding windows does not occur by chance. Instead, it requires a well planned and executed program of field maintenance. The lack of such a program is a major factor when a hot-cell facility has poor window viewing. At HFEF, all preventive maintenance is performed by one group of trained technical-support personnel under the immediate direction of a Systems Engineer, who has responsibility for the shielding windows. Window maintenance is prescheduled and recorded by being incorporated into the computerized Maintenance Data System (MDS). Measurements of window light transmission are scheduled annually to determine glass browning or oil cloudiness conditions within the window tank. The tank oil is sampled and chemically analyzed annually to determine the moisture content, the acidity, and the probable deterioration rate caused by irradiation

  16. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  17. NPP component maintenance and life management in Russia

    International Nuclear Information System (INIS)

    Tutnov, I.; Lyssakov, V.

    2002-01-01

    This report represents the conceptual strategies (ideas) on life management programs for nuclear power plants. Use of the optimum programs for NPP's NDE, maintenance service, operation and service life can provide the best economic benefit for the utilities. The paper presents general approaches to life management, maintenance service, and risks of operating and service life of NPPs in Russia. The report offers some optimized ways for the solution of these important tasks

  18. Hardware and software maintenance strategies for upgrading vintage computers

    International Nuclear Information System (INIS)

    Wang, B.C.; Buijs, W.J.; Banting, R.D.

    1992-01-01

    The paper focuses on the maintenance of the computer hardware and software for digital control computers (DCC). Specific design and problems related to various maintenance strategies are reviewed. A foundation was required for a reliable computer maintenance and upgrading program to provide operation of the DCC with high availability and reliability for 40 years. This involved a carefully planned and executed maintenance and upgrading program, involving complementary hardware and software strategies. The computer system was designed on a modular basis, with large sections easily replaceable, to facilitate maintenance and improve availability of the system. Advances in computer hardware have made it possible to replace DCC peripheral devices with reliable, inexpensive, and widely available components from PC-based systems (PC = personal computer). By providing a high speed link from the DCC to a PC, it is now possible to use many commercial software packages to process data from the plant. 1 fig

  19. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  20. The Nordic maintenance care program--time intervals between treatments of patients with low back pain: how close and who decides?

    DEFF Research Database (Denmark)

    Sandnes, Kjerstin F; Bjørnstad, Charlotte; Leboeuf-Yde, Charlotte

    2010-01-01

    The management of chiropractic patients with acute and chronic/persistent conditions probably differs. However, little is known on this subject. There is, for example, a dearth of information on maintenance care (MC). Thus it is not known if patients on MC are coerced to partake in a program...... of frequent treatments over a long period of time, or if they are actively involved in designing their own individualized treatment program....

  1. Nuclear Power Plant Preventive Maintenance Scheduling Problem with Fuzziness

    International Nuclear Information System (INIS)

    Abass, S.A.; Abdallah, A.S.

    2013-01-01

    Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant. Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance. In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty. The uncertainty will be represented by fuzzy parameters. The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon. Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life . It is more required to review the maintenance not only from the view point of safety and reliability but also economy. Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to. Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network. In this paper a mixed integer programming model is used to express this problem. In proposed model power demand is taken as fuzzy parameters. A case study is provided to demonstrate the efficiency of the proposed model.

  2. 25 CFR 170.802 - How is road maintenance funded?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is road maintenance funded? 170.802 Section 170.802 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.802 How is road maintenance funded? (a) The U.S. Congress funds a BIA...

  3. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  4. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Wilson, J.F. (PRC, Inc. (US))

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  5. Preparations for Severe Winter Conditions by Emergency Health Personnel in Turkey.

    Science.gov (United States)

    Calışkan, Cüneyt; Algan, Aysun; Koçak, Hüseyin; Biçer, Burcu Küçük; Sengelen, Meltem; Cakir, Banu

    2014-04-23

    Emergency and core ambulance personnel work under all environmental conditions, including severe weather condtions. We evaluated emergency medical personnel in Çanakkale, Turkey, for their degree of preparedness. A descriptive study was conducted in Çanakkale, Turkey, within 112 emergency service units and their 17 district stations. Surveys were developed to measure the level of preparedness for serious winter conditions that individual workers made for themselves, their homes, and their cars. Of the 167 survey participants, the mean age was 29.8 ± 7.9 years; 52.7% were women; more than half (54.75%) were emergency medical technicians; and 53.3% were married. Only 10.4% of those who heated their homes with natural gas had carbon monoxide detectors. Scores relating to household and individual preparation for severe winter conditions increased by participants' age (P tires (P winter conditions (P = .016). Many of the surveyed emergency health personel demonstrated insufficient preparations for serious winter conditions. To increase the safety and efficiency of emergency medical personnel, educational training programs should be rountinely conducted. (Disaster Med Public Health Preparedness. 2014;0:1-4).

  6. The maintenance management for lean organization

    Directory of Open Access Journals (Sweden)

    Daniel D. GEORGESCU

    2010-12-01

    Full Text Available The goal of lean maintenance approach is to maintain organization international competitiveness. In the spirit of continuously improvement, in the paper it is shown how by adjusting some Lean manufacturing specific techniques for Total Productive Maintenance (TPM system, was born new maintenance system named Lean TPM. This is a systemic approach with three techniques, which don’t exclude specific techniques of TPM pillars, but complete them: the 7Ss as a critical first step in any improvement program; instantaneous maintenance; improvement setup operations. In the spirit of Lean principle, Lean TPM adjusts overall equipment effectiveness concept for all supply-chain from supplier to customer. Maintaining equipment in its optimal state and continually improving its productivity is the whole strategy behind Lean TPM.

  7. Early implementation of the Maintenance Rule

    International Nuclear Information System (INIS)

    Green, J.R.

    1995-01-01

    On July 10, 1991, the U.S. Nuclear Regulatory Commission (NRC) published the Maintenance Rule as Section 50.65 of 10 CFR 50. The purpose of the Maintenance Rule is to ensure that the effectiveness of maintenance activities is assessed on an ongoing basis in a manner that ensures key structures, systems, and components are capable of performing their intended function. Full implementation of the rule is required by July 10, 1996. On May 31, 1994, the NRC published Generic Letter 94-01, which allowed removal of technical specification accelerated testing and special reporting requirements for emergency diesel generators provided a program is implemented for monitoring and maintaining emergency diesel generator performance consistent with the provisions of the Maintenance Rule

  8. Development of a model system to identify differences in spring and winter oat.

    Science.gov (United States)

    Chawade, Aakash; Lindén, Pernilla; Bräutigam, Marcus; Jonsson, Rickard; Jonsson, Anders; Moritz, Thomas; Olsson, Olof

    2012-01-01

    Our long-term goal is to develop a Swedish winter oat (Avena sativa). To identify molecular differences that correlate with winter hardiness, a winter oat model comprising of both non-hardy spring lines and winter hardy lines is needed. To achieve this, we selected 294 oat breeding lines, originating from various Russian, German, and American winter oat breeding programs and tested them in the field in south- and western Sweden. By assaying for winter survival and agricultural properties during four consecutive seasons, we identified 14 breeding lines of different origins that not only survived the winter but also were agronomically better than the rest. Laboratory tests including electrolytic leakage, controlled crown freezing assay, expression analysis of the AsVrn1 gene and monitoring of flowering time suggested that the American lines had the highest freezing tolerance, although the German lines performed better in the field. Finally, six lines constituting the two most freezing tolerant lines, two intermediate lines and two spring cultivars were chosen to build a winter oat model system. Metabolic profiling of non-acclimated and cold acclimated leaf tissue samples isolated from the six selected lines revealed differential expression patterns of 245 metabolites including several sugars, amino acids, organic acids and 181 hitherto unknown metabolites. The expression patterns of 107 metabolites showed significant interactions with either a cultivar or a time-point. Further identification, characterisation and validation of these metabolites will lead to an increased understanding of the cold acclimation process in oats. Furthermore, by using the winter oat model system, differential sequencing of crown mRNA populations would lead to identification of various biomarkers to facilitate winter oat breeding.

  9. Measurements of 427 Double Stars With Speckle Interferometry: The Winter/Spring 2017 Observing Program at Brilliant Sky Observatory, Part 1

    Science.gov (United States)

    Harshaw, Richard

    2018-04-01

    In the winter and spring of 2017, an aggressive observing program of measuring close double stars with speckle interferometry and CCD imaging was undertaken at Brilliant Sky Observatory, my observing site in Cave Creek, Arizona. A total of 596 stars were observed, 8 of which were rejected for various reasons, leaving 588 pairs. Of these, 427 were observed and measured with speckle interferometry, while the remaining 161 were measured with a CCD. This paper reports the results of the observations of the 427 speckle cases. A separate paper in this issue will report the CCD measurements of the 161 other pairs.

  10. Chloride Concentration in the Soil Polluted with Bishophit Used in Winter and its Effect on Herbaceous Plants

    Directory of Open Access Journals (Sweden)

    Asta Strėlkutė

    2014-10-01

    Full Text Available For road maintenance in winter, various chemical reagents, considering their physical and chemical properties, are chosen taking into account economic indicators. After a long winter season, large amounts of chemical reagents are used. During the winter season, dusting chlorides, first of all, fall on the roadway and a part of those reach roadsides where directly pollute the soil of the buffer zone and affect vegetation during the growing season. Chloride content in soil reduces the absorption of nutrients, which hinders the development of plants. It also has an effect on the metabolism of soil organisms, and therefore the loss of soil fertility. Due to high chloride content, land becomes unsuitable for plant growth. Studies used different concentrations (9 ml, 12 ml and 46 ml of bishophit. Chloride concentration in soil extract has been determined applying the volumetric method and employing silver nitrate titration. It has been determined that the amount of chloride in the soil contaminated with 9 ml makes 89.21 mg/kg, 12 ml – 94, 25 mg/kg and 164.32 mg/kg.

  11. Managing aging in nuclear power plants: Insights from NRC's Maintenance Team Inspection reports

    International Nuclear Information System (INIS)

    Fresco, A.; Subudhi, M.

    1992-01-01

    A plant's maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified

  12. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  13. Corrective maintenance support system for nuclear power plants

    International Nuclear Information System (INIS)

    Kakiuchi, Tetsuo

    1996-01-01

    With increase of share of nuclear power generation in electric power supply in Japan, requirement for further safe operation and improvement of economics for the nuclear power plants is promoting. The pressed water type (PWR) nuclear power plant in operation in Japan reaches to 22 sets, application rate of the instruments is 74% as mean value for 7 years since 1989 and in high level, which is due to a result of preventive maintenance in ordinary and periodical inspections. The present state of maintenance at the nuclear power plant is mainly preventive maintenance, which is mainly conducted in a shape of time planning maintenance but partially in a shape of state monitoring maintenance for partial rotating appliances. Concretely speaking, the periodical inspection was planned on a base of daily inspection and a long term program on maintenance, and executed on a base of feedback function to think of the long term program again by evaluating the periodical inspection results. Here were introduced on the monitoring diagnosis and periodical inspection regionalization equipment, fatigue monitoring system, automatic supersonic wave damage inspection equipment for reactor, steam evaporator heat conductive tube inspection equipment, automatic testing equipment for measuring controller, air working valve property testing equipment, as maintaining support system in the PW generation plant. (G.K.)

  14. Evaluation of NRC maintenance team inspection reports for managing aging

    International Nuclear Information System (INIS)

    Fresco, A.; Gunther, W.

    1991-01-01

    A nuclear power plant's maintenance program is the principal vehicle through which age-related degradation is managed. Over the past two years, the NRC [Nuclear Regulatory Commission] has evaluated the maintenance program of every nuclear power plant in the U.S. The reports issued on these in-depth team inspections have been reviewed to ascertain the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear power plant systems, structures, and components. Selected results of this review are presented in this paper, including examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue are also discussed. 6 refs., 1 tab

  15. Maintenance self-assessments - An INPO [Institute of Nuclear Power Operation] perspective

    International Nuclear Information System (INIS)

    Subalusky, W.T.

    1990-01-01

    In March 1987, all nuclear utilities in the US were requested by the Institute of Nuclear Power Operations (INPO) to perform a self-assessment of their maintenance programs. The goal of these self-assessments was to have each station identify any existing problem areas in maintenance in clear and sufficient detail to determine the root causes of the problems and to provide a foundation for subsequent corrective actions. The self-assessments were to be performed by each nuclear station using the INPO document Guidelines for the Conduct of Maintenance at Nuclear Power Stations. By December 1987, 72 of 74 stations had completed the self-assessments, and by the middle of 1988, all stations had completed this systematic review of their maintenance programs. As part of an industry plan to ensure continued improvements in maintenance, INPO is following up on the effectiveness of these self-assessments during the course of plant evaluation visits. This presentation briefly reviews the approaches to self-assessment of the station's maintenance programs, some of the lessons learned from this effort, and the results, to date, of INPO follow-up efforts in this area

  16. Assessing winter cover crop nutrient uptake efficiency using a water quality simulation model

    Science.gov (United States)

    Yeo, I.-Y.; Lee, S.; Sadeghi, A. M.; Beeson, P. C.; Hively, W. D.; McCarty, G. W.; Lang, M. W.

    2014-12-01

    Winter cover crops are an effective conservation management practice with potential to improve water quality. Throughout the Chesapeake Bay watershed (CBW), which is located in the mid-Atlantic US, winter cover crop use has been emphasized, and federal and state cost-share programs are available to farmers to subsidize the cost of cover crop establishment. The objective of this study was to assess the long-term effect of planting winter cover crops to improve water quality at the watershed scale (~ 50 km2) and to identify critical source areas of high nitrate export. A physically based watershed simulation model, Soil and Water Assessment Tool (SWAT), was calibrated and validated using water quality monitoring data to simulate hydrological processes and agricultural nutrient cycling over the period of 1990-2000. To accurately simulate winter cover crop biomass in relation to growing conditions, a new approach was developed to further calibrate plant growth parameters that control the leaf area development curve using multitemporal satellite-based measurements of species-specific winter cover crop performance. Multiple SWAT scenarios were developed to obtain baseline information on nitrate loading without winter cover crops and to investigate how nitrate loading could change under different winter cover crop planting scenarios, including different species, planting dates, and implementation areas. The simulation results indicate that winter cover crops have a negligible impact on the water budget but significantly reduce nitrate leaching to groundwater and delivery to the waterways. Without winter cover crops, annual nitrate loading from agricultural lands was approximately 14 kg ha-1, but decreased to 4.6-10.1 kg ha-1 with cover crops resulting in a reduction rate of 27-67% at the watershed scale. Rye was the most effective species, with a potential to reduce nitrate leaching by up to 93% with early planting at the field scale. Early planting of cover crops (~ 30

  17. SYSTMS: Systematic approach for the development of strategies for maintenance and surveillance

    International Nuclear Information System (INIS)

    Yang, J.X.; McCrea, L.; Dam, R.F.; Nickerson, J.H.

    2004-01-01

    As part of AECL's Integrated PLiM program, the SYSTMS TM tool has been developed to assist in applying the Systematic Assessment of Maintenance (SAM) technology. SYSTMS builds upon AECL's experience in this area, capturing lessons learned to result in an efficient and effective assessment of system maintenance in NPPs. An important feature of SYSTMS is that it provides analysts with needed information that is easy to review and select for inclusion in the system maintenance assessment. This is accomplished through the use of maintenance templates which can be built and tracked using SYSTMS or imported from AECL's own Maintenance Template Database. This database was developed originally to capture information gathered in SAM studies for use in future studies. It has grown to become a central tool for organizing and integrating aging related knowledge from both within AECL and from outside resources. The SYSTMS tool and the Maintenance Template Database work together to provide an effective tool for performing SAM assessments. This combination also becomes an integral part of the Asset Management program development and System based Adaptive Maintenance Program applications. This paper looks at the features of the SYSTMS tool and Maintenance Database, and discusses how these tools are an important part of the AECL Integrated PLiM products and services. (author)

  18. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  19. Component aging illustrated in maintenance histories from IPRDS

    International Nuclear Information System (INIS)

    Kahl, W.K.; Borkowski, R.J.

    1984-01-01

    The centerpiece of the In-Plant Reliability Data (IPRD) program is a nuclear power plant component data base developed from corrective maintenance records. The primary objective of this program is to establish a comprehensive source of information for reliability analyses, including the compilation of maintenance histories for failure statistics. The IPRD program is currently a pilot effort that has 36 reactor-years of data on pumps, valves, diesel generators, batteries, battery chargers and inverters from five nuclear plants. The data are collected under the auspices of the Institute of Electrical and Electronics Engineers (IEEE) to certify anonymity of the participating plants, and is funded by the Nuclear Regulatory Commission

  20. Hydrocarbon emissions from gas engine CHP-units. 2011 measurement program

    Energy Technology Data Exchange (ETDEWEB)

    Van Dijk, G.H.J. [KEMA, Arnhem (Netherlands)

    2012-06-15

    In December 2009, the Ministry of Infrastructure and Environment (IandM) issued the Decree on Emission Limits for Middle Sized Combustion Installations (BEMS). This decree imposes a first-time emission limit value (ELV) of 1500 mg C/m{sup 3}{sub o} at 3% O{sub 2} for hydrocarbons emitted by gas engines. IandM used the findings of two hydrocarbon emission measurement programs, executed in 2007 and 2009, as a guideline for this initial ELV. The programs did reveal substantial variation in the hydrocarbon emissions of the gas engines tested. This variation, and especially the uncertainty as to the role of engine and/or other parameters causing such variation, was felt to hamper further policy development. IandM therefore commissioned KEMA to perform follow-up measurements on ten gas engine CHP-units in 2011. Aim of this 2011 program is to assess hydrocarbon emission variation in relation to engine parameters and process conditions including maintenance status, and to atmospheric conditions. The 2011 program comprised two identical measurement sessions, one in spring and one in winter.

  1. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    Energy Technology Data Exchange (ETDEWEB)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  2. Reliability Centered Maintenance for Savannah River Site`s interim waste management facilities. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Wilson, J.F. [PRC, Inc. (US)

    1992-06-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  3. Developing a comprehensive training curriculum for integrated predictive maintenance

    Science.gov (United States)

    Wurzbach, Richard N.

    2002-03-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  4. Developing Predictive Maintenance Expertise to Improve Plant Equipment Reliability

    International Nuclear Information System (INIS)

    Wurzbach, Richard N.

    2002-01-01

    On-line equipment condition monitoring is a critical component of the world-class production and safety histories of many successful nuclear plant operators. From addressing availability and operability concerns of nuclear safety-related equipment to increasing profitability through support system reliability and reduced maintenance costs, Predictive Maintenance programs have increasingly become a vital contribution to the maintenance and operation decisions of nuclear facilities. In recent years, significant advancements have been made in the quality and portability of many of the instruments being used, and software improvements have been made as well. However, the single most influential component of the success of these programs is the impact of a trained and experienced team of personnel putting this technology to work. Changes in the nature of the power generation industry brought on by competition, mergers, and acquisitions, has taken the historically stable personnel environment of power generation and created a very dynamic situation. As a result, many facilities have seen a significant turnover in personnel in key positions, including predictive maintenance personnel. It has become the challenge for many nuclear operators to maintain the consistent contribution of quality data and information from predictive maintenance that has become important in the overall equipment decision process. These challenges can be met through the implementation of quality training to predictive maintenance personnel and regular updating and re-certification of key technology holders. The use of data management tools and services aid in the sharing of information across sites within an operating company, and with experts who can contribute value-added data management and analysis. The overall effectiveness of predictive maintenance programs can be improved through the incorporation of newly developed comprehensive technology training courses. These courses address the use of

  5. Henslow's sparrow winter-survival estimates and response to prescribed burning

    Science.gov (United States)

    Thatcher, B.S.; Krementz, D.G.; Woodrey, M.S.

    2006-01-01

    Wintering Henslow's sparrow (Ammodramus henslowii) populations rely on lands managed with prescribed burning, but the effects of various burn regimes on their overwinter survival are unknown. We studied wintering Henslow's sparrows in coastal pine savannas at the Mississippi Sandhill Crane National Wildlife Refuge, Jackson County, Mississippi, USA, during January and February 2001 and 2002. We used the known-fate modeling procedure in program MARK to evaluate the effects of burn age (1 or 2 growing seasons elapsed), burn season (growing, dormant), and calendar year on the survival rates of 83 radiomarked Henslow's sparrows. We found strong evidence that Henslow's sparrow survival rates differed by burn age (with higher survival in recently burned sites) and by year (with lower survival rates in 2001 likely because of drought conditions). We found some evidence that survival rates also differed by bum season (with higher survival in growing-season sites), although the effects of burn season were only apparent in recently burned sites. Avian predation was the suspected major cause of mortality (causing 6 of 14 deaths) with 1 confirmed loggerhead shrike (Lanius ludovicianus) depredation. Our results indicated that recently burned savannas provide high-quality wintering habitats and suggested that managers can improve conditions for wintering Henslow's sparrows by burning a large percentage of savannas each year.

  6. 24 CFR 266.507 - Maintenance requirements.

    Science.gov (United States)

    2010-04-01

    ... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.507 Maintenance requirements. The mortgagor must maintain the project in...

  7. Operational experience and maintenance programs of Transamerica Delaval, Inc., diesel generators

    International Nuclear Information System (INIS)

    Rajan, J.R.

    1994-05-01

    Concerns regarding the reliability of large-bore, medium-speed diesel generators manufactured by Transamerica Delaval, Inc. (TDI) for application at domestic nuclear plants were first prompted by a crankshaft failure at Shoreham Nuclear Power Station in August 1983. A number of diesel generator components were identified which had potential deficiencies from a manufacturing and operational standpoint. In response to these problems, 11 (now 8) U.S. nuclear utility owners formed a TDI Diesel Generator Owners Group (Owners Group) to address operational and regulatory issues relative to diesel generator sets used for standby emergency power. The Owners' Group performed extensive design reviews of all key engine components and developed recommendations to be implemented by the individual owners concerning needed component replacements and modifications, component inspections to validate the open-quotes as-manufacturedclose quotes and open-quotes as-assembledclose quotes quality of key engine components, engine testing, and an enhanced maintenance and surveillance program

  8. Estimating winter survival of winter wheat by simulations of plant frost tolerance

    NARCIS (Netherlands)

    Bergjord Olsen, A.K.; Persson, T.; Wit, de A.; Nkurunziza, L.; Sindhøj, E.; Eckersten, H.

    2018-01-01

    Based on soil temperature, snow depth and the grown cultivar's maximum attainable level of frost tolerance (LT50c), the FROSTOL model simulates development of frost tolerance (LT50) and winter damage, thereby enabling risk calculations for winter wheat survival. To explore the accuracy of this

  9. Preventive maintenance basis: Volume 19 -- HVAC -- chillers and compressors. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to HVAC -- Chillers and Compressors. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  10. Incorporating Yearly Derived Winter Wheat Maps Into Winter Wheat Yield Forecasting Model

    Science.gov (United States)

    Skakun, S.; Franch, B.; Roger, J.-C.; Vermote, E.; Becker-Reshef, I.; Justice, C.; Santamaría-Artigas, A.

    2016-01-01

    Wheat is one of the most important cereal crops in the world. Timely and accurate forecast of wheat yield and production at global scale is vital in implementing food security policy. Becker-Reshef et al. (2010) developed a generalized empirical model for forecasting winter wheat production using remote sensing data and official statistics. This model was implemented using static wheat maps. In this paper, we analyze the impact of incorporating yearly wheat masks into the forecasting model. We propose a new approach of producing in season winter wheat maps exploiting satellite data and official statistics on crop area only. Validation on independent data showed that the proposed approach reached 6% to 23% of omission error and 10% to 16% of commission error when mapping winter wheat 2-3 months before harvest. In general, we found a limited impact of using yearly winter wheat masks over a static mask for the study regions.

  11. Winter weather demand considerations.

    Science.gov (United States)

    2015-04-01

    Winter weather has varied effects on travel behavior. Using 418 survey responses from the Northern Virginia : commuting area of Washington, D.C. and binary logit models, this study examines travel related changes under : different types of winter wea...

  12. Degradation mode analysis: An approach to establish effective predictive maintenance tasks

    International Nuclear Information System (INIS)

    Sonnett, D.E.; Douglass, P.T.; Barnard, D.D.

    1991-01-01

    A significant number of nuclear generating stations have been employing Reliability Centered Maintenance methodology to arrive at applicable and effective maintenance tasks for their plant equipment. The resultant endpoint of most programs has been an increased emphasis on predictive maintenance as the task of choice for monitoring and trending plant equipment condition to address failure mechanisms of the analyses. Many of these plants have spent several years conducting reliability centered analysis before they seriously begin implementing predictive program improvements. In this paper we present another methodology, entitled Degradation Mode Analysis, which provides a more direct method to quickly and economically achieve the major benefit of reliability centered analysis, namely predictive maintenance. (author)

  13. The influence of sowing period and seeding norm on autumn vegetation, winter hardiness and yield of winter cereal crops

    Directory of Open Access Journals (Sweden)

    Potapova G. N.

    2017-10-01

    Full Text Available the winter wheat and triticale in the middle part of the Ural Mountains haven’t been seeded before. The technology of winter crop cultivation should be improved due to the production of new varieties of winter rye. Winter hardiness and yield of winter rye are higher in comparison with winter triticale and especially with winter wheat. The sowing period and the seeding rate influence the amount of yield and winter hardiness. The winter hardiness of winter cereals and the yield of the rye variety Iset sowed on August 25 and the yield of the triticale variety Bashkir short-stalked and wheat Kazanskaya 560 sowed on August 15 were higher. It is important to sow winter grain in local conditions in the second half of August. The sowing this period allows to provide plants with the necessary amount of positive temperatures (450–500 °C. This helps the plants to form 3–4 shoots of tillering and a mass of 10 dry plants reaching 3–5 grams. The winter grain crops in the middle part of the Ural Mountains should be sown with seeding rates of 6 and 7 million of sprouting grains per 1 ha, and the seeds must be cultivated with fungicidal preparation before seeding.

  14. Determining effects of an all weather logging road on winter woodland caribou habitat use in south-eastern Manitoba

    Directory of Open Access Journals (Sweden)

    Doug W. Schindler

    2007-04-01

    Full Text Available The Owl Lake boreal woodland caribou population is the most southerly population in Manitoba. It is provincially ranked as a High Conservation Concern Population. Forestry operations exist in the area and there are plans for further forest harvest and renewal. The Happy Lake logging road is the only main access through the Owl Lake winter range. This logging road is currently closed to the public and access is limited to forestry operations during specific times of the year. An integrated forestry/caribou management strategy for the area provides for the maintenance of minimum areas of functional habitat. Habitat quality along the road was compared to habitat quality in the winter core use areas, within the winter range and outside the winter range. To evaluate the extent of functional habitat near the road, we conducted animal location and movement analysis using GPS data collected from January 2002 to March 2006. Habitat quality in the winter range, core use areas and along the road were assessed and found to be similar. Analysis of caribou locations and movement illustrate less use of high quality habitat adjacent to the Happy Lake Road. Loss of functional habitat is suggested to occur within 1 kilometre of the road. This potential loss of functional habitat should be incorporated into integrated forestry and caribou conservation strategies. Road management is recommended to minimize the potential sensory disturbance and associated impacts of all weather access on boreal woodland caribou.

  15. Performing maintenance activities on-line a risk perspective

    International Nuclear Information System (INIS)

    Darling, S.S.; Mairs, T.P.

    1993-01-01

    The US nuclear power industry is attempting to deal with the issue of optimizing the performance of maintenance activities with the advent of the maintenance rule. The impact of any maintenance activity on the safe operation of a nuclear power facility can be quantified on the basis of risk. Therefore, it is incumbent upon the industry to accommodate the regulator and present a maintenance optimization program in terms that explicitly address the potential risk inherent in its concept and implementation. The motivation for utilities to perform maintenance while the plant is operating (i.e., on-line) is readily perceived to offer the following advantages: 1. greater system availability; 2. higher plant capacity factor; 3. more evenly distributed workload for the maintenance department; and 4. overall safer plant operation. However, risks inherent in undertaking maintenance activities during power operation could amount to the realization that reapportionment of these tasks is not cost-beneficial. Therefore, it is important that any utility considering implementing such a paradigm in maintenance philosophy establish a rigorous process to select, perform, and monitor maintenance tasks performed while operating

  16. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Science.gov (United States)

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.806 What is an IRR Transportation Facilities Maintenance Management System? An IRR Transportation Facilities Maintenance Management... 25 Indians 1 2010-04-01 2010-04-01 false What is an IRR Transportation Facilities Maintenance...

  17. The nuclear winter

    International Nuclear Information System (INIS)

    Velikhow, Y.P.

    1986-01-01

    Nuclear winter is an example of possible secondary effects, and if we speak of secondary we are thinking of small-scale second-order effects, but a nuclear winter is not a second-order effect. If you calculate the amount of heat produced by a nuclear explosion, it is a very small amount which does not have any chance of changing the Earth's climate, but a nuclear explosion drives or stars some new mechanism - the mechanism of nuclear winter - after 100 megatons of dust are transferred to the upper atmosphere. Another example of such amplification is radioactive fall-out, especially long-life radioactive fall-out after the possible elimination of the nuclear power industry, nuclear storage and distribution of storage waste around the globe. This is a very powerful amplification mechanism

  18. Maintenance cost avoidance through comprehensive condition monitoring

    International Nuclear Information System (INIS)

    Miller, G.P.; McClymonds, S.L.

    1990-01-01

    Condition monitoring, the measurement and trending of a critical parameter for predictive maintenance, has reached new levels of acceptance and application within the utility and manufacturing industry. Commercially available systems extend well beyond traditional vibration-monitoring systems to include such areas as online wear, crack and leak detection, and stress monitoring. The challenge facing industry is to integrate the information generated from condition monitoring. Current studies indicate that the effectiveness of predictive maintenance depends much more on the program that is established to apply the monitoring techniques than on the monitoring equipment itself. This paper presents a five-phase approach to developing a condition monitoring program

  19. 6. CNS international conference on CANDU maintenance. Proceedings

    International Nuclear Information System (INIS)

    2003-01-01

    The 6th CNS International Conference on CANDU Maintenance took place in Toronto, Ontario on November 16-18, 2003. The theme for the conference was 'Maintenance for Life'. About 270 delegates attended the conference held by the Canadian Nuclear Society. The conference consisted of four parallel sessions, a pattern that continued throughout the conference. Papers were grouped under the following headings: Fuel Channels and End Fittings - Assessments; Fuel Channels and End Fittings - Inspections; Fuel Channels and End Fittings - Maintenance; Fuel Channels and End Fittings - Universal Delivery Machine; Water Upgrading; Performance and Plant Life Improvement; Steam Generator Life Management; Steam Generator Modifications; Steam Generators - Inspections; Steam Generators - Assessments; Maintenance Programs; Feeder Inspections; Feeder Assessment and Mitigation; Valve Maintenance; Instrumentation and Control; Inspection Technology; and Fuel Handling

  20. 49 CFR 260.39 - Maintenance standards.

    Science.gov (United States)

    2010-10-01

    ... REHABILITATION AND IMPROVEMENT FINANCING PROGRAM Standards for Maintenance of Facilities Involved in the Project... the project. (b) When the proceeds of a direct loan or an obligation guaranteed by the Administrator...

  1. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    International Nuclear Information System (INIS)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D ampersand D) Program is part of the Department of Energy (DOE) Environmental Restoration D ampersand D Program and has continued to provide surveillance and maintenance (S ampersand M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S ampersand M planning, (2) routine S ampersand M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance

  2. Increased body mass of ducks wintering in California's Central Valley

    Science.gov (United States)

    Fleskes, Joseph P.; Yee, Julie L.; Yarris, Gregory S.; Loughman, Daniel L.

    2016-01-01

    Waterfowl managers lack the information needed to fully evaluate the biological effects of their habitat conservation programs. We studied body condition of dabbling ducks shot by hunters at public hunting areas throughout the Central Valley of California during 2006–2008 compared with condition of ducks from 1979 to 1993. These time periods coincide with habitat increases due to Central Valley Joint Venture conservation programs and changing agricultural practices; we modeled to ascertain whether body condition differed among waterfowl during these periods. Three dataset comparisons indicate that dabbling duck body mass was greater in 2006–2008 than earlier years and the increase was greater in the Sacramento Valley and Suisun Marsh than in the San Joaquin Valley, differed among species (mallard [Anas platyrhynchos], northern pintail [Anas acuta], America wigeon [Anas americana], green-winged teal [Anas crecca], and northern shoveler [Anas clypeata]), and was greater in ducks harvested late in the season. Change in body mass also varied by age–sex cohort and month for all 5 species and by September–January rainfall for all except green-winged teal. The random effect of year nested in period, and sometimes interacting with other factors, improved models in many cases. Results indicate that improved habitat conditions in the Central Valley have resulted in increased winter body mass of dabbling ducks, especially those that feed primarily on seeds, and this increase was greater in regions where area of post-harvest flooding of rice and other crops, and wetland area, has increased. Conservation programs that continue to promote post-harvest flooding and other agricultural practices that benefit wintering waterfowl and continue to restore and conserve wetlands would likely help maintain body condition of wintering dabbling ducks in the Central Valley of California.

  3. The Middle Atmosphere Program: Winter In Northern Europe (MAP/WINE)

    Science.gov (United States)

    Vonzahn, U.

    1982-04-01

    The goals of map/wind (winter in Northern Europe) are to better understand: (1) the interaction of planetary waves of tropospheric origin; (2) the temporal and spatial development of sudden stratospheric warmings; (3) the temporal and spatial development of mesospheric cooling events in conjunction with stratospheric warmings; (4) the vertical and horizontal transport of minor constituents; (5) the effects on the chemistry of neutral and charged species of the large temperature changes occurring during stratospheric warmings and mesospheric cooling; (6) sources of turbulent energy; (7) the temporal and spatial development of turbulent layers; and (8) the contributions of dynamical processes to the heating and cooling of the mesospheric and turbopause region.

  4. A Business Process Analysis of the Surface Navys Depot Maintenance Program

    Science.gov (United States)

    2015-12-01

    levels of maintenance and the ways in which the Navy employs these types of maintenance to accomplish the objective of sustaining the surface fleet...stripping it of inefficiencies to ensure there is no wasted movement. Toyota , Honda, and their Japanese counterparts championed the lean process and...are another way trust is built, because they cultivate the relationships necessary for process improvement and innovation. JSPs have career

  5. Preventive maintenance basis: Volume 37 -- Main turbine EHC hydraulics. Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1998-11-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to the main turbine EHC hydraulic fluid and associated components. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program

  6. Applying reliability centered maintenance analysis principles to inservice testing

    International Nuclear Information System (INIS)

    Flude, J.W.

    1994-01-01

    Federal regulations require nuclear power plants to use inservice test (IST) programs to ensure the operability of safety-related equipment. IST programs are based on American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements. Many of these plants also use Reliability Centered Maintenance (RCM) to optimize system maintenance. ASME Code requirements are hard to change. The process for requesting authority to use an alternate strategy is long and expensive. The difficulties of obtaining this authority make the use of RCM method on safety-related systems not cost effective. An ASME research task force on Risk Based Inservice Testing is investigating changing the Code. The change will allow plants to apply RCM methods to the problem of maintenance strategy selection for safety-related systems. The research task force is working closely with the Codes and Standards sections to develop a process related to the RCM process. Some day plants will be able to use this process to develop more efficient and safer maintenance strategies

  7. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development

  8. Instrumentalization of eating improves weight loss maintenance in obesity

    DEFF Research Database (Denmark)

    Christensen, Bodil Just; Iepsen, Eva Pers Winning; Lundgren, Julie Rehné

    2017-01-01

    Aim: The purpose of this study was to identify psychosocial determinants for maintaining weight loss. Methods: 42 obese individuals who achieved a 12% weight loss before entering a 52-week weight maintenance program were interviewed qualitatively. Psychosocial factors related to weight loss...... weight loss maintenance was associated with an interplay between behavioral, affective and contextual changes. ‘Instrumentalization of eating behavior' seems to be an important element in long-term weight maintenance....

  9. National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010

    Energy Technology Data Exchange (ETDEWEB)

    Schell, D.

    2011-02-01

    Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

  10. Improvement of the preventive maintenance program of an emergency diesel generator set

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Meuwisse, C.; Cailleaux, J.P.

    1995-01-01

    An exhaustive Reliability Centered Maintenance (RCM) analysis was performed of the emergency diesel generator sets in Electricite de France 900-MW nuclear power plants. The first part of this paper describes the Reliability Centered Maintenance approach, including the functional breakdown, complete analysis of operation feedback and safety assessment of the risk induced by functional diesel failures. The second part shows how this kind of RCM analysis can be used to improve the efficiency of periodic tests of the machine, and more generally, the efficiency of condition-directed maintenance tasks. The underlying objective is to minimize risk and aging of the machine

  11. Effect of job maintenance training program for employees with chronic disease - a randomized controlled trial on self-efficacy, job satisfaction, and fatigue

    NARCIS (Netherlands)

    Varekamp, Inge; Verbeek, Jos H.; de Boer, Angela; van Dijk, Frank J. H.

    2011-01-01

    Employees with a chronic physical condition may be hampered in job performance due to physical or cognitive limitations, pain, fatigue, psychosocial barriers, or because medical treatment interferes with work. This study investigates the effect of a group-training program aimed at job maintenance.

  12. Performance-based maintenance procurement by Dutch housing associations

    NARCIS (Netherlands)

    Straub, A.

    2004-01-01

    OTB Research institute has established a long-term research program to performance-based maintenance procurement in the technical management of housing stock. Stakeholders: housing associations, contractors and the Dutch Building Research Foundation are directly involved in this research program.

  13. Winter fuels report

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-29

    The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and state and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD) I, II, and III; natural gas supply and disposition and underground storage for the United States and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those states participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the United States and selected cities; and US total heating degree-days by city. 27 figs, 12 tabs.

  14. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  15. The maintenance and the data bank of Spanish NNPP (DACNE SYSTEM)

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    1995-01-01

    New projects and activities appear at Nuclear Industry with the purpose of improving availability and safety of the plants, i.e. Probabilistic Safety Assessment (PSA), maintenance optimization programs or life extension programs. A common characteristic of these projects is that they need collect data from different sources. A multipurpose information system, as Spanish DACNE System, can be useful. Some applicabilities are presented in maintenance area. (Author)

  16. Understanding and Predicting the Process of Software Maintenance Releases

    Science.gov (United States)

    Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.

    1996-01-01

    One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

  17. Oak Ridge Research Reactor shutdown maintenance and surveillance

    International Nuclear Information System (INIS)

    Coleman, G.H.; Laughlin, D.L.

    1990-10-01

    The Department of Energy ordered the Oak Ridge Research Center Reactor to be placed in permanent shutdown on July 14, 1987. Maintenance activities, both mechanical and instrument, were essentially routine in nature. The performance of the instrumentation for the facility was satisfactory, and maintenance required is provided. The performance of the process system was satisfactory, and maintenance required is indicated. The results of efficiency tests of the various gaseous-waste filters have been summarized and preparations for transfer of the facility to the remedial action program is also indicated

  18. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  19. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  20. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  1. Starting a Planned Maintenance Program on a Shoestring

    Science.gov (United States)

    Adams, Matt

    2013-01-01

    This article addresses two of the most repeated questions in APPA (1) How can we convert our reactive maintenance operations to a planned and predictable operation? and (2) In addition, how can we do this with little or no additional resources? It seems reasonable to assume that if a department is short on resources and in a full-blown reactive…

  2. Plant life management and maintenance technologies for nuclear power plants

    International Nuclear Information System (INIS)

    Ikegami, Tsukasa; Aoki, Masataka; Shimura, Takao; Kaimori, Kimihiro; Koike, Masahiro

    2001-01-01

    Nuclear power generation occupying an important position for energy source in Japan and supplying about one third of total electric power usage is now required for further upgrading of its economics under regulation relaxation of electric power business. And, under execution retardation of its new planning plant, it becomes important to operate the already established plants for longer term and to secure their stability. Therefore, technical development in response to the plant life elongation is promoted under cooperation of the Ministry of Economics and Industries, electric power companies, literate, and plant manufacturers. Under such conditions, the Hitachi, Ltd. has progressed some technical developments on check inspection, repairs and maintenance for succession of the already established nuclear power plants for longer term under securing of their safety and reliability. And in future, by proposing the check inspection and maintenance program combined with these technologies, it is planned to exert promotion of maintenance program with minimum total cost from a viewpoint of its plant life. Here were described on technologies exerted in the Hitachi, Ltd. such as construction of plant maintenance program in response to plant life elongation agreeing with actual condition of each plant, yearly change mechanism grasping, life evaluation on instruments and materials necessary for maintenance, adequate check inspection, repairs and exchange, and so forth. (G.K.)

  3. Breaker Maintenance: Volume 3, Molded-Case circuit breakers

    International Nuclear Information System (INIS)

    Davis, E.L.; Funk, D.L.

    1991-09-01

    Modeled-case circuit breakers (MCCBs) provide power and circuit protection in nuclear plant electrical distribution systems. Thus, their proper operation is essential to the safe and reliable operation of plant electrical distribution systems. This guide for both nuclear and non-nuclear power generating facilities will help improve the maintenance and reliability of MCCBs. The authors developed this guide to establish a working-level understanding of hardware performance trends, reliability, and failure modes from which maintenance practices could be specified. The first step in preparing this guide was an in-depth review of available operating experience and failure data, which was obtained from nuclear information sources such as EPRI's Nuclear Maintenance Applications Center. In addition, they evaluated some nonnuclear reliability data. Next, they investigated current industry practices, including a review of manufacturer's recommendations and numerous industry standards. Finally, they used the collective information to develop programmatic recommendations and, where appropriate, detailed inspection and test guidance. This guide offers many recommendations applicable to MCCB maintenance, such as an engineering description of MCCBs and their operation; an overview of reliability and failure data; programmatic recommendations, including inspection and test periodicity; detailed inspection and test guidance; and corrective maintenance recommendations. Supplementary information includes an overview of industry standards, a discussion of regulatory issues, and sample data sheets. An evaluation of operating experience indicates that a maintenance program need not be overly complicated to detect the predominant failure modes associated with MCCBs. Those implementating an MCCB maintenance and testing program, however, must recognize the inherent limitations associated with field-testing of these devices. 42 refs., 17 figs., 7 tabs

  4. Measurements of 161 Double Stars With a High-Speed CCD: The Winter/Spring 2017 Observing Program at Brilliant Sky Observatory, Part 2

    Science.gov (United States)

    Harshaw, Richard

    2018-04-01

    In the winter and spring of 2017, an aggressive observing program of measuring close double stars with speckle interferometry and CCD imaging was undertaken at Brilliant Sky Observatory, my observing site in Cave Creek, Arizona. A total of 596 stars were observed, 8 of which were rejected for various reasons, leaving 588 pairs. Of these, 427 were observed and measured with speckle interferometry, while the remaining 161 were measured with a CCD. This paper reports the results of the observations of the 161 CCD cases. A separate paper in this issue will report the speckle measurements of the 427 other pairs.

  5. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    International Nuclear Information System (INIS)

    Cohen, Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-01-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O ampersand M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O ampersand M Improvement Program. O ampersand M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O ampersand M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O ampersand M costs was achieved. Based on the lessons learned, an optimum solar- field O ampersand M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O ampersand M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts

  6. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  7. Maintenance Resources Evaluation Technique.

    Science.gov (United States)

    1999-03-01

    variable Z; P-6 BIBLIOGRAPHY Argentine Air Force. Reglamento de Conduction Logistica RAC 9 (Logistics Management Regulation). Estado Mayor General de ...other hand, too many resources are expensive to acquire and maintain and difficult to transport . 1-1 Sizing the means needed to accomplish its...functional areas (maintenance, supply/inventory, transportation , etc), methodologies of operations research (simulation, mathematical programming

  8. Initiating stochastic maintenance optimization at Candu Power Plants

    International Nuclear Information System (INIS)

    Doyle, E.K.

    2003-01-01

    As previously reported at ICONE 6 in New Orleans (1996), the use of various innovative maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Further cost refinement of the station maintenance strategy is being evaluated via the applicability of statistical analysis of historical failure data. Since the statistical evaluation was initiated in 1999 significant progress has been made in demonstrating the viability of stochastic methods in Candu maintenance. Some of the relevant results were presented at ICONE 10 in Washington DC (2002). Success with the graphical displays and the relatively easy to implement stochastic computer programs was sufficient to move the program along to the next significant phase. This next phase consists of investigating the validity of using subjective elicitation techniques to obtain component lifetime distributions. This technique provides access to the elusive failure statistics, the lack of which is often referred to in the literature as the principle impediment preventing the use of stochastic methods in large industry. At the same time the technique allows very valuable information to be captured from the fast retiring 'baby boom generation'. Initial indications have been quite positive. (author)

  9. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2011-12-14

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  10. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  11. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1203 Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall arrange for full funding for operation and maintenance of contract schools by fiscal year 1981. ...

  12. The History of Winter: A Professional Development "Teacher as Scientist" Experiential Learning Field Experience.

    Science.gov (United States)

    Gabrys, R. E.

    2007-12-01

    Each year since 2000, the NASA Goddard History of Winter (HOW) program has allowed teachers to develop an understanding of the consequences of one segment of the orbit of the tilted Earth in its path around the sun. Scientists from NASA, CRREL, and Michigan Tech, supported by the Whiteface Observatory, and the science program at Northwood School in Lake Placid, New York, use the weather and the stratigraphy in the ice and snow, consequences of the weather changes, as "teachers" in a team study of the winter record. Snow in the air and on the ground, ice, its crystal structure and axial orientation, and the ecosystem consequences of snow and ice constitute the weeklong content package. Teacher Professional Development Standards A, B, C, and D were the guiding principles in developing HOW with a content structure formulated as protocols to serve as inserts into lesson plans and inquiry guides. The concept of HOW within NASA is to provide understanding of the WHY? and WHAT? of satellite remote sensing. The content is appropriate ground validation in that techniques presented in protocols are identical to those used by professionals who study snow pits, evaluate features in snow metamorphism, and study thin sections of ice cores drilled in ice caps and glaciers. The HOW Teacher as scientist (TAS) model is a flexible model. HOW enables teachers who are required to use inquiry-based facilitation in the classroom to experience inquiry themselves. Teachers with little science content background as well as those with Science degrees have participated in HOW working alongside of the science team. Accommodations are made through differentiation of instruction so that each group leaves with a mastery of the content that is appropriate for the transition to presentation in the classroom. Each year builds on the previous year ensuring a time series record of the history of winter-by itself a learning experience. An offshoot of the NASA Goddard Center History of Winter (HOW

  13. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  14. Cost effective maintenance to supply end user value: Visionary or utopian

    NARCIS (Netherlands)

    Wessels, J.; Alten, K.; Turk, M.R.; Palić, S.Š.

    2013-01-01

    Infrastructure stakeholders expect maintenance managers to deliver acceptable End User Service Levels (EUSL), such as availability, comfort, and safety. Means of controlling these requirements involve technical maintenance and operative measures. Within the ERANET Road Program 'Effective asset

  15. 46 CFR 45.73 - Winter freeboard.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Winter freeboard. 45.73 Section 45.73 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) LOAD LINES GREAT LAKES LOAD LINES Freeboards § 45.73 Winter freeboard. The minimum winter freeboard (fw) in inches is obtained by the formula: fw=f(s)+T s...

  16. Status of maintenance in the US nuclear power industry 1985. Volume 1. Findings and conclusions

    International Nuclear Information System (INIS)

    1986-06-01

    This report presents the findings, conclusions and recommendations derived from activities performed under Phase I of the NRC Maintenance and Surveillance Program (MSP). Findings are based on trends and patterns derived from operational data compiled by the NRC for the period 1980 through 1985, site surveys conducted at eight plants, and questionnaires administered to NRC Resident Inspectors to characterize nuclear power plant maintenance programs and practices. These activities have shown that plant maintenance programs and practices are highly variable from plant-to-plant and are currently undergoing major changes. While measured plant performance has improved overall since 1980, the maintenance-related contribution to reportable events and challenges to safety systems remains high and is increasing by some measures. The findings of Phase I of the MSP confirmed a number of problems in nuclear power plant maintenance which warrant further NRC and industry attention

  17. Trend analysis in the nuclear maintenance industry

    International Nuclear Information System (INIS)

    Ruemeli, W.A.

    1986-01-01

    The maintenance of nuclear facilities is a demanding, ongoing activity which requires the same level of quality as new construction. Heretofore, many owners and contractors have relied on ''gut feel'' to determine whether maintenance quality was improving or not. However, trend analysis now is becoming a key factor in monitoring plant activities to ensure quality. Literature abounds with descriptions of computerized systems for collecting and sorting data. Even the Nuclear Regulatory Commission (NRC) has concurred, with its endorsement of trend analysis of construction indicators in NUREG 1055 (Ford Amendment Study). Stearns Catalytic has developed a unique system of tend analyses for nuclear plant activities. Aside from its intended purpose of determining the quality trends in maintenance activities, the program also supplies substantial quantitative data for control and management of the quality activities. Trend analysis is a time series analysis of a set of observations arranged in chronological order. The important aspect is the time basis, specifically the analysis of quality indicators over successive periods of time. Many program elements, including surveillances, nonconformances, inspections, and audits, are designed to look at quality indications

  18. Surface Moisture Measurement System Operation and Maintenance Manual

    International Nuclear Information System (INIS)

    Ritter, G.A.; Pearce, K.L.; Stokes, T.L.

    1995-12-01

    This operations and maintenance manual addresses deployment, equipment and field hazards, operating instructions, calibration verification, removal, maintenance, and other pertinent information necessary to safely operate and store the Surface Moisture Measurement System (SMMS) and Liquid Observation Well Moisture Measurement System (LOWMMS). These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  19. Winter fuels report

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-13

    The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and State and local governments on the following topics: distillate fuel oil net production, imports and stocks on a US level and for all Petroleum Administration for Defense Districts (PADD) and product supplied on a US level; propane net production, imports and stocks on a US level and for PADD`s I, II, and III; natural gas supply and disposition and underground storage for the US and consumption for all PADD`s, as well as selected National average prices; residential and wholesale pricing data for heating oil and propane for those States participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the US and selected cities; and a 6-10 day, 30-Day, and 90-Day outlook for temperature and precipitation and US total heating degree-days by city.

  20. Winter fuels report

    International Nuclear Information System (INIS)

    1995-01-01

    The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and State and local governments on the following topics: distillate fuel oil net production, imports and stocks on a US level and for all Petroleum Administration for Defense Districts (PADD) and product supplied on a US level; propane net production, imports and stocks on a US level and for PADD's I, II, and III; natural gas supply and disposition and underground storage for the US and consumption for all PADD's, as well as selected National average prices; residential and wholesale pricing data for heating oil and propane for those States participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil and petroleum price comparisons for the US and selected cities; and a 6-10 day, 30-Day, and 90-Day outlook for temperature and precipitation and US total heating degree-days by city

  1. [Paediatric emergencies; example of the management of winter epidemics].

    Science.gov (United States)

    Mercier, Jean-Christophe; Bellettre, Xavier; Lejay, Émilie; Desmarest, Marie; Titomanlio, Luigi

    2015-01-01

    Every year, epidemics of viral bronchiolitis and gastroenteritis occur with a significant increase in the number of visits (by a factor 1.8) and hospitalisations that can over-exceed bed capacity leading to transfer sick children to other hospitals. This kind of hospital 'crisis' is not limited to paediatrics, big cities or western nations. It is a worldwide worrying problem. Because our hospital sits in the Northern districts of Paris where a large community of m.ncants lives in poverty, our number of visits is high (mean 250 per day), and winter epidemics further jeopardise the difficult equilibrium achieved between quality management and waiting times. Thus, we have taken various initiatives in terms of organisation of the paediatric emergency department and other wards, including a "fast track" clinic, the opening of beds dedicated to winter epidemics, the institution of a "bed manager" in order to more easily find a bed, and a larger use of home hospitalisations. Furthermore, we created a specific committee which may decide on various indicators of tension whether it is necessary to cancel programmed hospitalisations or surgery.in order to resolve the emergency crisis. This kind of organisation can serve as a model for other hospitals facing winter epidemics crises.

  2. Annual summary report on surveillance and maintenance activities of the surplus contaminated facilities program at Oak Ridge National Laboratory for period ending September 30, 1991

    International Nuclear Information System (INIS)

    Cannon, T.R.; Ford, M.K.; Holder, L. Jr.

    1991-09-01

    The Surplus Contaminated Facilities Program (SCFP) was established at the Oak Ridge National Laboratory (ORNL) in 1985 to provide support for inactive contaminated facilities that were largely abandoned by the programs which they formerly served. This support provides for routine surveillance and maintenance (S ampersand M) and special projects beyond a routine nature when such actions are needed to ensure adequate protection of personnel or the environment. The facilities included in the program had been used for research, technology development, isotope production and processing, and waste management. Support for facilities in the SCFP has previously been provided by the Department of Energy's (DOE's) Office of Energy Research: Multiprogram Energy Laboratories -- Facilities Support (ERKG) because of multiprogram use of the facilities or because of the landlord responsibility of Energy Research. Recently, an integrated Decontamination and Decommissioning (D ampersand D) program within the DOE Office of Environmental Restoration and Waste Management has been established to collectively manage the former Surplus Facilities Management Program, Defense D ampersand D Program, and the KG-funded, ORNL-originated SCFP. This report gives an overview of the S ampersand M planning, routine S ampersand M, and special maintenance project activities which have occurred at the SCFP facilities during the 1991 Fiscal Year

  3. A remote maintenance robot system for a pulsed nuclear reactor

    International Nuclear Information System (INIS)

    Thunborg, S.

    1987-01-01

    This paper presents a remote maintenance robot system for use in a hazardous environment. The system consists of turntable, robot and hoist subsystems which operate under the control of a supervisory computer to perform coordinated programmed maintenance operations on a pulsed nuclear reactor. The system is operational

  4. Maintenance - a design perspective

    International Nuclear Information System (INIS)

    Hedges, K.R.

    1992-01-01

    The paper describes how the CANDU-3 has incorporated, at the design stage, maintenance requirements such as component accessibility, standardization, ease of replacement, reduction in the number of components, and simplified component design. AECL is also active in the planned rehabilitation of the four units at Ontario Hydro's Bruce A nuclear generating station. In addition to conceptual design and development, detailed design and analysis, procurement and site assistance, AECL's Sheridan Park Laboratory will provide important development and mockup facilities. An AECL research and development program on reactor maintenance includes the identification and characterization of aging and degrading mechanisms, the tailoring of developed products to plant requirements, and the identification of areas of international cooperation and information exchange. 3 tabs., 1 fig

  5. Maintenance of Certification®, Maintenance of Public Trust

    Science.gov (United States)

    Chung, Kevin C.; Clapham, Philip J.; Lalonde, Donald H.

    2010-01-01

    The Maintenance of Certification® (MOC) program has been well received by many physicians, but faced significant opposition from others, who complain that it is overly tedious, costly, and irrelevant to their practice. This article offers a consolidated and concise history of the MOC program and a summary of what plastic surgeons need to know to successfully complete the American Board of Plastic Surgery’s (ABPS) own MOC requirements. The authors have justified each step of the ABPS’s MOC process in terms of how it improves the quality of care delivered to Plastic Surgery patients. Finally, a summary of research is presented that demonstrates both that the public supports the MOC process for all physicians and that continuing education and formal assessment and improvement initiatives have been linked in multiple studies to a better and more evidence-based medical practice. PMID:21285803

  6. Maintenance of remote reconnaissance vehicle

    International Nuclear Information System (INIS)

    Schein, D.C.

    1985-01-01

    A description is provided of the maintenance program developed for remote reconnaissance vehicles, such as RRV-1, in use at the Three Mile Island Unit 2. The described approach, which is simple, effective, and flexible, helped to make the effort successful. It will be applied to future projects

  7. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Schwan, C.A.; Morgan, T.A.

    1991-04-01

    Reliability centered maintenance (RCM) is an approach to preventive maintenance planning and evaluation that has been used successfully by other industries, most notably the airlines and military. Now EPRI is demonstrating RCM in the commercial nuclear power industry. Just completed are large-scale, two-year demonstrations at Rochester Gas ampersand Electric (Ginna Nuclear Power Station) and Southern California Edison (San Onofre Nuclear Generating Station). Both demonstrations were begun in the spring of 1988. At each plant, RCM was performed on 12 to 21 major systems. Both demonstrations determined that RCM is an appropriate means to optimize a PM program and improve nuclear plant preventive maintenance on a large scale. Such favorable results had been suggested by three earlier EPRI pilot studies at Florida Power ampersand Light, Duke Power, and Southern California Edison. EPRI selected the Ginna and San Onofre sites because, together, they represent a broad range of utility and plant size, plant organization, plant age, and histories of availability and reliability. Significant steps in each demonstration included: selecting and prioritizing plant systems for RCM evaluation; performing the RCM evaluation steps on selected systems; evaluating the RCM recommendations by a multi-disciplinary task force; implementing the RCM recommendations; establishing a system to track and verify the RCM benefits; and establishing procedures to update the RCM bases and recommendations with time (a living program). 7 refs., 1 tab

  8. The advantages of reliability centered maintenance for standby safety systems

    International Nuclear Information System (INIS)

    Dam, R.F.; Ayazzudin, S.; Nickerson, J.H.; DeLong, A.I.

    2002-01-01

    Full text: On standby safety systems, nuclear plants have to balance the requirements of demonstrating the reliability of each system, while maintaining the system and plant availability. With the goal of demonstrating statistical reliability, these systems have extensive testing programs, which often makes the system unavailable and this can impact the plant capacity. The inputs to the process are often safety and regulatory related, resulting in programs that provide a high level of scrutiny on the systems being considered. In such cases, the value of the application of a maintenance optimization strategy, such as Reliability Centered Maintenance (RCM), is questioned. Part of the question stems from the use of the word 'Reliability' in RCM, which implies a level of redundancy when applied to a system maintenance program driven by reliability requirements. A deeper look at the RCM process, however, shows that RCM has the goal of ensuring that the system operates 'reliably' through the application of an integrated maintenance strategy. This is a subtle, but important distinction. Although the system reliability requirements are an important part of the strategy evaluation, RCM provides a broader context where testing is only one part of an overall strategy focused on ensuring that component function is maintained through a combination of monitoring technologies (including testing), predictive techniques, and intrusive maintenance strategies. Each strategy is targeted to identify known component degradation mechanisms. The conclusion is that a maintenance program driven by reliability requirements will tend to have testing defined at a frequency intended to support the needed statistics. The testing demonstrates that the desired function is available today. Maintenance driven by functional requirements and known failure causes, as developed through an RCM assessment, will have frequencies tied to industry experience with components and rely on a higher degree of

  9. Prioritising alternatives for maintenance of water distribution ...

    African Journals Online (AJOL)

    2012-06-26

    Jun 26, 2012 ... This study aimed to support a group decision-making process in the maintenance ... program to prioritise alternatives, simultaneously taking into account .... compensatory method that requires inter-criterion information.

  10. Cost Analysis of Maintenance Programs for Pre-Positioned War Reserve Material Stock (PWRMS)

    National Research Council Canada - National Science Library

    Cyr, Phillip

    2002-01-01

    ...) for that maintenance. The objective is to provide DoD, the Navy, and the Civil Engineer Corps a guideline and possible benchmark for maintenance costs required to maintain the CESE War Reserves in a Cl condition of readiness...

  11. The relationship between substance use and posttraumatic stress disorder in a methadone maintenance treatment program.

    Science.gov (United States)

    Villagonzalo, Kristi-Ann; Dodd, Seetal; Ng, Felicity; Mihaly, Stephen; Langbein, Amy; Berk, Michael

    2011-01-01

    Posttraumatic stress disorder (PTSD) is frequently linked with substance abuse. The self-medication hypothesis suggests that some people may use illicit substances in an attempt to self-treat psychiatric symptoms. This study explores the relationship between substance abuse and PTSD symptom clusters in a methadone maintenance population. Clients of a methadone maintenance program at a public Drug and Alcohol Service were invited to complete the PTSD Checklist-Civilian Version, a screening tool for PTSD. Information about their history of substance use was also collected. Eighty clients (43 female, 37 male), aged 35 ± 8.0 years (mean ± SD), participated in the study, of which 52.7% screened positive for PTSD. Severity of marijuana use was significantly associated with a number of reexperiencing and hyperarousal symptoms and with overall severity of PTSD symptoms. Opiate, amphetamine, and benzodiazepine use did not appear to be related to PTSD symptoms. In this sample, marijuana may be used to self-treat certain PTSD symptoms, supporting the self-medication hypothesis. Further research is required to confirm the association between a diagnosis of PTSD and substance use. Given the high prevalence of PTSD in the substance-using population, routine PTSD screening in the substance abuse treatment setting may be justified. Copyright © 2011 Elsevier Inc. All rights reserved.

  12. Seminar-meeting on maintenance of nuclear instruments, 24 October -3 November 1980, Quezon City, Philippines

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This collection is composed of twenty (20) papers on the repair, maintenance and maintenance plans, of nuclear instruments, training programs for maintenance technicians, and experiences in the maintenance of nuclear instruments in Indonesia, Japan, Philippines, India, Thailand, Sri Lanka, Pakistan, Korea and Malaysia. (author)

  13. An Introduction to Quantitative Measures for Software Maintenance of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jo, Hyun Jun; Seong, Poong Hyun

    2007-01-01

    The I and C system of NPP has changed from the analog system to the digital-based system using microcontrollers and software. Thus, software has become very important for NPP control system. The software life cycle is divided into the development and maintenance phase largely. Because poor software maintenance work introduces new errors and makes software much complex, we have to consider the effective maintenance methods for the reliability and maintainability of NPP software. Function Block Diagram (FBD) is a standard application programming language for the Programmable Logic Controller (PLC) and currently being used in the development of a fully-digitalized reactor protection system (RPS) under the KNICS project. Therefore, the maintenance work will be of great importance in a few years. This paper studies on the measures which give quantitative information to software maintainer and manager before and after modification. The remainder of this paper is organized as follows. Section 2 briefly describes software maintenance types and model. In Section 3-5, we introduce the quantitative measures for software maintenance and characteristics of FBD program. A conclusion is provided in Section 6

  14. Beyond AIRSpeed: How Organizational Modeling and Simulation Further Reduced Engine Maintenance Time

    National Research Council Canada - National Science Library

    Hagan, Joel; Slack, William; Zolin, Roxanne; Dillard, John

    2007-01-01

    The Aircraft Intermediate Maintenance Division (AIMD) at Naval Air Station (NAS) Lemoore, CA, has worked aggressively to reduce engine maintenance time using the tools of the NAVAIR Enterprise AiRSpeed (AiRSpeed) program...

  15. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    Haenninen, S.; Laakso, K.

    1993-03-01

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  16. A reliability program for emergency diesel generators at nuclear power plants: Maintenance, surveillance, and condition monitoring

    International Nuclear Information System (INIS)

    Lofgren, E.V.; Henderson, W.; Burghardt, D.; Kripps, L.; Rothleder, B.

    1988-12-01

    This report is a companion report on NUREG/CR-5078, Volume 1, ''A Reliability Program for Emergency Diesel Generators at Nuclear Power Plants: Program Structure.'' The purpose of this report is to provide technical findings and insights related to: failure evaluation, troubleshooting, maintenance, surveillance, and condition monitoring. Examples and recommendations are provided for each of these areas based on actual emergency diesel generator (EDG) operating experience and the opinions of diesel generator experts. This report expands the more general guidance provided in Volume 1. In addition, a discussion of EDG interactions with other plant systems (e.g., instrument, air, service water, dc power) is provided since experience has shown that these support systems and their operation can adversely affect EDG reliability. Portions of this report have been designed for use by onsite personnel for evaluating operational characteristics of EDGs. 5 refs., 8 figs., 7 tabs

  17. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  18. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap [Multipurpose Research Reactor G.A. Siwabessy, National Nuclear Energy Agency (Indonesia)

    1999-10-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  19. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    International Nuclear Information System (INIS)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap

    1999-01-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  20. Estimating contribution of anthocyanin pigments to osmotic adjustment during winter leaf reddening.

    Science.gov (United States)

    Hughes, Nicole M; Carpenter, Kaylyn L; Cannon, Jonathan G

    2013-01-15

    The association between plant water stress and synthesis of red, anthocyanin pigments in leaves has led some plant biologists to propose an osmotic function of leaf reddening. According to this hypothesis, anthocyanins function as a solute in osmotic adjustment (OA), contributing to depression of osmotic potential (Ψ(π)) and maintenance of turgor pressure during drought-stressed conditions. Here we calculate the percent contribution of anthocyanin to leaf Ψ(π) during OA in two angiosperm evergreen species, Galax urceolata and Gaultheria procumbens. Both species exhibit dramatic leaf reddening under high light during winter, concomitant with declines in leaf water potential and accumulation of solutes. Data previously published by the authors on osmotic potential at full turgor (Ψ(π,100)) of G. urceolata and G. procumbens leaves before and after leaf reddening were used to estimate OA. In vivo molar concentrations of anthocyanin, glucose, fructose, and sucrose measured from the same individuals were converted to pressure equivalents using the Ideal Gas Law, and percent contribution to OA was estimated. Estimated mean OA during winter was -0.7MPa for G. urceolata and -0.8MPa for G. procumbens. In vivo concentrations of anthocyanin (3-10mM) were estimated to account for ∼2% of OA during winter, and comprised <0.7% of Ψ(π,100) in both species. Glucose, fructose, and sucrose combined accounted for roughly 50 and 80% of OA for G. urceolata and G. procumbens, respectively, and comprised ∼20% of Ψ(π,100). We observed that a co-occurring, acyanic species (Vinca minor) achieved similar OA without synthesizing anthocyanin. We conclude that anthocyanins represent a measurable, albeit meager, component of OA in red-leafed evergreen species during winter. However, due to their low concentrations, metabolic costliness relative to other osmolytes, and striking red color (unnecessary for an osmotic function), it is unlikely that they are synthesized solely for an

  1. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5

  2. Preventive and corrective maintenance for MINT EPS 3000 electron beam machine

    International Nuclear Information System (INIS)

    Siti Aiasah Hashim; Shaari Jahar

    2005-01-01

    Preventive and corrective maintenance of a high energy electron is to ensure that the machine would not fail during operation. MINT's EPS 3000 electron beam machine has been in operation for almost 12 years. Throughout those years, events relating to scheduled overhauls and unscheduled corrective maintenance had provided invaluable experience in the form of informal maintenance training to the operators. With the implementation of ISO 9001:2000 Quality Management System at the facility, the preventive and corrective maintenance program is becoming more structured and orderly. Collected maintenance data shall be used to initiate continual improvement activities in the facility.This paper describes MINT-ALURTRON's 12 years experience in providing maintenance work for the EPS 3000. (Author)

  3. Winter warming from large volcanic eruptions

    Science.gov (United States)

    Robock, Alan; Mao, Jianping

    1992-01-01

    An examination of the Northern Hemisphere winter surface temperature patterns after the 12 largest volcanic eruptions from 1883-1992 shows warming over Eurasia and North America and cooling over the Middle East which are significant at the 95-percent level. This pattern is found in the first winter after tropical eruptions, in the first or second winter after midlatitude eruptions, and in the second winter after high latitude eruptions. The effects are independent of the hemisphere of the volcanoes. An enhanced zonal wind driven by heating of the tropical stratosphere by the volcanic aerosols is responsible for the regions of warming, while the cooling is caused by blocking of incoming sunlight.

  4. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences

  5. Development of a maintenance manipulator for TFTR

    International Nuclear Information System (INIS)

    Holloway, C.

    1986-01-01

    The maintenance manipulator is a device permanently connected to the Tokamak Fusion Test Reactor (TFTR) vacuum vessel and is located in close proximity to the tokamak. It is used for the inspection and maintenance of in-vessel components whilst the machine remains under vacuum. The total system comprises a vacuum vessel ante-chamber that houses the manipulator, an articulated boom and carriage that transports and positions a dexterous end-effector, and end-effector that supports maintenance tooling, and an inspection system. Because of the maintenance manipulator's operating environment, there are many challenging engineering features, i.e., temperatures up to 150 0 C, changing magnetic fields in space and time that act on the manipulator whilst it is at rest, neutron neutron fluxes of up to 10/sup 11/cm/sup -2/s/sup -1/, and, last but not least, UHV conditions. This paper describes the development of the vacuum system, the maintenance manipulator, and inspective devices. It includes the methods employed to overcome the engineering difficulties and the application of information gained from other advanced technology programs, such as space and nuclear fission

  6. Building Maintenance: Introduction. Units of Instruction. Teacher's Guide. First Edition.

    Science.gov (United States)

    Barnes, Bill

    This volume, the first in a series of publications that will provide entry-level competencies in the area of building maintenance, is designed as an introduction. The seven instructional units cover these areas in the shop program: (1) introduction to building maintenance, (2) leadership development, (3) personal development, (4) job application…

  7. Honolulu Community College Program Health Indicators: 2000-2001 Program Reviews.

    Science.gov (United States)

    Hawaii Univ., Honolulu. Honolulu Community Coll.

    This report presents an overall health summation of 21 programs offered at Honolulu Community College (Hawaii) during 2000-2001. The programs profiled are: (1) Auto Body Repair and Painting; (2) Aeronautics Maintenance Technology; (3) Administration of Justice; (4) Automotive Mechanics Technology; (5) Boat Maintenance Repair; (6) Carpentry; (7)…

  8. Low clouds suppress Arctic air formation and amplify high-latitude continental winter warming.

    Science.gov (United States)

    Cronin, Timothy W; Tziperman, Eli

    2015-09-15

    High-latitude continents have warmed much more rapidly in recent decades than the rest of the globe, especially in winter, and the maintenance of warm, frost-free conditions in continental interiors in winter has been a long-standing problem of past equable climates. We use an idealized single-column atmospheric model across a range of conditions to study the polar night process of air mass transformation from high-latitude maritime air, with a prescribed initial temperature profile, to much colder high-latitude continental air. We find that a low-cloud feedback--consisting of a robust increase in the duration of optically thick liquid clouds with warming of the initial state--slows radiative cooling of the surface and amplifies continental warming. This low-cloud feedback increases the continental surface air temperature by roughly two degrees for each degree increase of the initial maritime surface air temperature, effectively suppressing Arctic air formation. The time it takes for the surface air temperature to drop below freezing increases nonlinearly to ∼ 10 d for initial maritime surface air temperatures of 20 °C. These results, supplemented by an analysis of Coupled Model Intercomparison Project phase 5 climate model runs that shows large increases in cloud water path and surface cloud longwave forcing in warmer climates, suggest that the "lapse rate feedback" in simulations of anthropogenic climate change may be related to the influence of low clouds on the stratification of the lower troposphere. The results also indicate that optically thick stratus cloud decks could help to maintain frost-free winter continental interiors in equable climates.

  9. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  10. Measurement and control system for ITER remote maintenance equipment

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  11. Measurement and control system for ITER remote maintenance equipment

    International Nuclear Information System (INIS)

    Oka, Kiyoshi; Kakudate, Satoshi; Takeda, Nobukazu; Takiguchi, Yuji; Akou, Kentaro

    1998-01-01

    ITER in-vessel components such as blankets and divertors are categorized as scheduled maintenance components because they are subjected to severe plasma heat and particle loads. Blanket maintenance requires remote handling equipment and tools able to handle Heavy payloads of about 4 tons within a 2 mm precision tolerance. Divertor maintenance requires remote replacement of 60 cassettes with a dead weight of about 25 tons each. In the ITER R and D program, full-scale remote handling equipment for blanket and divertor maintenance has been designed and assembled for demonstration tests. This paper reviews the measurement and control system developed for full-scale remote handling equipment, the Japan Home Team contribution. (author)

  12. The role of knowledge sharing and transactive memory system on condition based maintenance policy

    NARCIS (Netherlands)

    Koochaki, J.; Bouwhuis, I. M.

    2008-01-01

    Today, Condition Based Maintenance (CBM) has reached a sophisticated level in industry and the advantages of predictive maintenance are accepted globally. However, although lots of effort has been put into improving methods and techniques in CBM, most of predictive maintenance programs fail to

  13. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  14. Fatty acid oxidation is required for active and quiescent brown adipose tissue maintenance and thermogenic programing.

    Science.gov (United States)

    Gonzalez-Hurtado, Elsie; Lee, Jieun; Choi, Joseph; Wolfgang, Michael J

    2018-01-01

    To determine the role of fatty acid oxidation on the cellular, molecular, and physiologic response of brown adipose tissue to disparate paradigms of chronic thermogenic stimulation. Mice with an adipose-specific loss of Carnitine Palmitoyltransferase 2 (Cpt2 A-/- ), that lack mitochondrial long chain fatty acid β-oxidation, were subjected to environmental and pharmacologic interventions known to promote thermogenic programming in adipose tissue. Chronic administration of β3-adrenergic (CL-316243) or thyroid hormone (GC-1) agonists induced a loss of BAT morphology and UCP1 expression in Cpt2 A-/- mice. Fatty acid oxidation was also required for the browning of white adipose tissue (WAT) and the induction of UCP1 in WAT. In contrast, chronic cold (15 °C) stimulation induced UCP1 and thermogenic programming in both control and Cpt2 A-/- adipose tissue albeit to a lesser extent in Cpt2 A-/- mice. However, thermoneutral housing also induced the loss of UCP1 and BAT morphology in Cpt2 A-/- mice. Therefore, adipose fatty acid oxidation is required for both the acute agonist-induced activation of BAT and the maintenance of quiescent BAT. Consistent with this data, Cpt2 A-/- BAT exhibited increased macrophage infiltration, inflammation and fibrosis irrespective of BAT activation. Finally, obese Cpt2 A-/- mice housed at thermoneutrality exhibited a loss of interscapular BAT and were refractory to β3-adrenergic-induced energy expenditure and weight loss. Mitochondrial long chain fatty acid β-oxidation is critical for the maintenance of the brown adipocyte phenotype both during times of activation and quiescence. Copyright © 2017 The Authors. Published by Elsevier GmbH.. All rights reserved.

  15. Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Jenness, R.G.; Wicker, C.D.

    1975-01-01

    The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer-programmed maintenance system has been established at the Laboratory. (auth)

  16. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  17. Maintenance Strategies to Reduce Downtime Due to\\ud Machine Positional Errors

    OpenAIRE

    Shagluf, Abubaker; Longstaff, Andrew P.; Fletcher, Simon

    2014-01-01

    Manufacturing strives to reduce waste and increase\\ud Overall Equipment Effectiveness (OEE). When managing machine tool maintenance a manufacturer must apply an appropriate decision technique in order to reveal hidden costs associated with production losses, reduce equipment downtime\\ud competently and similarly identify the machines’ performance.\\ud Total productive maintenance (TPM) is a maintenance program that involves concepts for maintaining plant and equipment effectively. OEE is a pow...

  18. Effect of job maintenance training program for employees with chronic disease - a randomized controlled trial on self-efficacy, job satisfaction, and fatigue.

    Science.gov (United States)

    Varekamp, Inge; Verbeek, Jos H; de Boer, Angela; van Dijk, Frank J H

    2011-07-01

    Employees with a chronic physical condition may be hampered in job performance due to physical or cognitive limitations, pain, fatigue, psychosocial barriers, or because medical treatment interferes with work. This study investigates the effect of a group-training program aimed at job maintenance. Essential elements of the program are exploration of work-related problems, communication at the workplace, and the development and implementation of solutions. Participants with chronic physical diseases were randomly assigned to the intervention (N=64) or the control group (N=58). Participants were eligible for the study if they had a chronic physical disease, paid employment, experienced work-related problems, and were not on long-term 100% sick leave. Primary outcome measures were self-efficacy in solving work- and disease-related problems (14-70), job dissatisfaction (0-100), fatigue (20-140) and job maintenance measured at 4-, 8-, 12- and 24-month follow-up. We used GLM repeated measures for the analysis. After 24 months, loss to follow-up was 5.7% (7/122). Self-efficacy increased and fatigue decreased significantly more in the experimental than the control group [10 versus 4 points (P=0.000) and 19 versus 8 points (P=0.032), respectively]. Job satisfaction increased more in the experimental group but not significantly [6 versus 0 points (P=0.698)]. Job maintenance was 87% in the experimental and 91% in the control group, which was not a significant difference. Many participants in the control group also undertook actions to solve work-related problems. Empowerment training increases self-efficacy and helps to reduce fatigue complaints, which in the long term could lead to more job maintenance. Better understanding of ways to deal with work-related problems is needed to develop more efficient support for employees with a chronic disease.

  19. Implementation of a Computerized Maintenance Management System

    Science.gov (United States)

    Shen, Yong-Hong; Askari, Bruce

    1994-01-01

    A primer Computerized Maintenance Management System (CMMS) has been established for NASA Ames pressure component certification program. The CMMS takes full advantage of the latest computer technology and SQL relational database to perform periodic services for vital pressure components. The Ames certification program is briefly described and the aspects of the CMMS implementation are discussed as they are related to the certification objectives.

  20. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  1. Technology Trend in the Maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yoon, Kyungsup; Lee, Unjang

    2014-01-01

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel

  2. Technology Trend in the Maintenance of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Kyungsup; Lee, Unjang [CTO and CEO, Seoul (Korea, Republic of)

    2014-05-15

    In this paper, overall technology evolution is reviewed and the improvements in the plant safety, reliability and productivity are described. And the issue and some recommendation for better maintenance of Korean nuclear power plants are presented as the interim study results on the 'Management and Regulatory Policy for the Nuclear Power Plant Maintenance and Equipment Reliability' under the agreement with the Nuclear Safety and Security Commission. The future trend in the maintenance technologies is also covered. Maintenance is the essential element for the enhancement of plant safety, reliability and economics and also for public safety. Therefore the regulator's involvements and the utility's active participation is inevitable for the better maintenance. For the better sustainability of our nuclear power plants the followings are recommended. ·Establishment of the good maintenance program and continuous improvement. ·Application of OLM on the safety related and non-safety related components by step-by-step approach. ·Improvement PRA technology for the accurate and reliable risk analysis. ·Continuous training and cultivation for the qualified maintenance personnel.

  3. Risk-Informed Decisions Optimization in Inspection and Maintenance

    International Nuclear Information System (INIS)

    Robertas Alzbutas

    2002-01-01

    The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in

  4. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    Science.gov (United States)

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  5. Integrated Technical Information for the Air Logistics Center: Enhancing Maintenance Technician Task Performance

    National Research Council Canada - National Science Library

    Mitta, Deborah

    1998-01-01

    This technical paper documents the final results of an analysis of the task environment under which depot maintenance technicians perform their jobs--specifically, programmed depot maintenance (PDM) for F-15 aircraft...

  6. Titan's Emergence from Winter

    Science.gov (United States)

    Flasar, F. Michael; Achterberg, Richard; Jennings, Donald; Schinder, Paul

    2011-01-01

    We summarize the changes in Titans thermal structure derived from Cassini CIRS and radio-occultation data during the transition from winter to early spring. Titan's surface, and middle atmosphere show noticeable seasonal change, whereas that in most of the troposphere is mated. This can be understood in terms of the relatively small radiative relaxation time in the middle atmosphere and much larger time scale in the troposphere. The surface exhibits seasonal change because the heat capacity in an annual skin depth is much smaller than that in the lowest scale height of the troposphere. Surface temperatures rise 1 K at raid and high latitudes in the winter northern hemisphere and cool in the southern hemisphere. Changes in in the middle atmosphere are more complicated. Temperatures in the middle stratosphere (approximately 1 mbar) increase by a few kelvin at mid northern latitudes, but those at high latitudes first increase as that region moves out of winter shadow, and then decrease. This probably results from the combined effect of increased solar heating as the suit moves higher in the sky and the decreased adiabatic warming as the sinking motions associated with the cross-equatorial meridional cell weaken. Consistent with this interpretation, the warm temperatures observed higher up at the winter polar stratopause cool significantly.

  7. Optimizing Maintenance Planning in the Production Industry Using the Markovian Approach

    Directory of Open Access Journals (Sweden)

    B Kareem

    2012-12-01

    Full Text Available Maintenance is an essential activity in every manufacturing establishment, as manufacturing effectiveness counts on the functionality of production equipment and machinery in terms of their productivity and operational life. Maintenance cost minimization can be achieved by adopting an appropriate maintenance planning policy. This paper applies the Markovian approach to maintenance planning decision, thereby generating optimal maintenance policy from the identified alternatives over a specified period of time. Markov chains, transition matrices, decision processes, and dynamic programming models were formulated for the decision problem related to maintenance operations of a cable production company. Preventive and corrective maintenance data based on workloads and costs, were collected from the company and utilized in this study. The result showed variability in the choice of optimal maintenance policy that was adopted in the case study. Post optimality analysis of the process buttressed the claim. The proposed approach is promising for solving the maintenance scheduling decision problems of the company.

  8. Software Tools for Software Maintenance

    Science.gov (United States)

    1988-10-01

    COMMUNICATIONS, AND COMPUTER SCIENCES I ,(AIRMICS) FO~SOFTWARE TOOLS (.o FOR SOF1 ’ARE MAINTENANCE (ASQBG-1-89-001) October, 1988 DTIC ELECTE -ifB...SUNWW~. B..c Program An~Iysw HA.c C-Tractr C Cobol Stncturing Facility VS Cobol 11 F-Scan Foctma Futbol Cobol Fortran Sltiuc Code Anaiyaer Fortran IS

  9. High protein mutants of winter fodder barley induced by radiation and chemical mutagens

    Energy Technology Data Exchange (ETDEWEB)

    Yankulov, M.; Genchev, K.; Nikolov, Kh.

    1982-01-01

    Several induced mutants of winter fodder barley with higher rpotein content are described. These mutants were produced by treating seeds of cvs. Vogelsaenger Gold, Ager and 468 with gamma-rays, sodium azide and ethyl methanesulfonate (alone and in combinations) and with ethylene and formamide. The gamma-ray induced mutants of winter fodder barley have 1-4% higher protein content. The mutant line 109 has, besides high protein content (17,37%), 5.96 lysine per 100 g protein, but its endosperm is wrinkeled. Mutants produced by chemical mutagens have 6-7% higher protein content than the initial cultivars. All induced mutants have 85-95 cm high stems, i.e. they are by 10-20 cm shorter than the initial cultivars. Some of these mutants are now resistant to the diseases Helminthosporium gramineum and Ustilago nuda. The recommended mutants could be successfully used in breeding programs for producing of higher protein content and quality in winter fodder barley.

  10. High protein mutants of winter fodder barley induced by radiation and chemical mutagens

    International Nuclear Information System (INIS)

    Yankulov, M.; Genchev, K.; Nikolov, Kh.

    1982-01-01

    Several induced mutants of winter fodder barley with higher rpotein content are described. These mutants were produced by treating seeds of cvs. Vogelsaenger Gold, Ager and 468 with gamma-rays, sodium azide and ethyl methanesulfonate (alone and in combinations) and with ethylene and formamide. The gamma-ray induced mutants of winter fodder barley have 1-4% higher protein content. The mutant line 109 has, besides high protein content (17,37%), 5.96 lysine per 100 g protein, but its endosperm is wrinkeled. Mutants produced by chemical mutagens have 6-7% higher protein content than the initial cultivars. All induced mutants have 85-95 cm high stems, i.e. they are by 10-20 cm shorter than the initial cultivars. Some of these mutants are now resistant to the diseases Helminthosporium gramineum and Ustilago nuda. The recommended mutants could be successfully used in breeding programs for producing of higher protein content and quality in winter fodder barley

  11. Can the Air Force and Airlines Collaborate for Mutual Benefit An Exploration of Pilot and Maintenance Workforce Options

    Science.gov (United States)

    2016-01-01

    Virgin America UNIQUE_CARRIER_NAME 14 Figure 8. Air Force and Commercial Maintenance Personnel Salaries NOTE: AF Annual = Air Force, enlisted. Avg...have drill weekends Holiday : blue No week 5: orange Weekend split over 2 months: purple We also considered the overlap between ARC...ebb in the winter. Cargo airlines have a sustained busy season in November and December with holiday package shipping. We obtained five years of

  12. 36 CFR 1002.19 - Winter activities.

    Science.gov (United States)

    2010-07-01

    ... RECREATION § 1002.19 Winter activities. (a) Skiing, snowshoeing, ice skating, sledding, innertubing, tobogganing and similar winter sports are prohibited on Presidio Trust roads and in parking areas open to...

  13. Maintenance concept development for the Compact Ignition Tokamak

    International Nuclear Information System (INIS)

    Macdonald, D.

    1988-01-01

    The Compact Ignition Tokamak (CIT), located at the Princeton Plasma Physics Laboratory, will be the next major experimental machine in the US Fusion Program. Its use of deuterium-tritium (D-T) fuel requires the use of remote handling technology to carry out maintenance operations on the machine. These operations consist of removing and repairing such components as diagnostic equipment modules by using remotely operated maintenance equipment. The major equipment being developed for maintenance external to the vacuum vessel includes both bridge-mounted and floor-mounted manipulator systems. Additionally, decontamination (decon) equipment, hot cell repair facilities, and equipment for handling and packaging solid radioactive waste (rad-waste) are being developed. Recent design activities have focused on establishing maintenance system interfaces with the facility design, developing manipulator system requirements, and using mock-ups to support the tokamak configuration design. 3 refs., 8 figs

  14. Comprehensive low-cost reliability centered maintenance. Final report

    International Nuclear Information System (INIS)

    Rotton, S.J.; Dozier, I.J.; Thow, R.

    1995-09-01

    Reliability Centered Maintenance (RCM) is a maintenance optimization approach that all electric utilities can apply to power plant systems. The Electric Power Research Institute and PECO Energy Company jointly sponsored this Comprehensive Low-Cost Reliability Centered Maintenance project to demonstrate that the standard RCM methodology could be streamlined to reduce the cost of analysis while maintaining a high quality product. EPRI's previous investigation of streamlined RCM methods being pioneered in the nuclear industry indicated that PECO Energy could expect to optimize its maintenance program at reduced cost by carefully controlling the scope without sacrificing documentation or technical quality. Using the insights obtained from these previous studies, three methods were defined in this project and were demonstrated in a large scale application to 60 systems at both the Limerick Generating Station and the Peach Bottom Atomic Power Station

  15. Maintenance features of the Compact Ignition Tokamak fusion reactor

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Hager, E.R.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is envisaged to be the next experimental machine in the US Fusion Program. Its use of deuterium/tritium fuel requires the implementation of remote handling technology for maintenance and disassembly operations. The reactor is surrounded by a close-proximity nuclear shield which is designed to permit personnel access within the test cell, one day after shutdown. With the shield in place, certain maintenance activities in the cell may be done hands-on. Maintenance on the reactor is accomplished remotely using a boom-mounted manipulator after disassembling the shield. Maintenance within the plasma chamber is accomplished with two articulated boom manipulators that are capable of operating in a vacuum environment. They are stored in a vacuum enclosure behind movable shield plugs

  16. Moving toward Personalized Medicine in the Methadone Maintenance Treatment Program: A Pilot Study on the Evaluation of Treatment Responses in Taiwan

    Directory of Open Access Journals (Sweden)

    Hsin-Ya Lee

    2013-01-01

    Full Text Available This pilot study simultaneously evaluated the effects of various factors, including genetic variations of CYP2B6, CYP2C19, and ABCB1, demographic characteristics, disease states, methadone-drug interactions (MDIs, and poly-substance use, on the treatment responses among non-HIV patients in the methadone maintenance treatment program (MMTP in Taiwan. A total of 178 patients were recruited from two major hospitals that provided MMTP services in southern Taiwan, and information regarding concomitant medications and diseases was acquired from the National Health Insurance (NHI program. The results demonstrated that the methadone maintenance dose, CYP2B6 785G allele, and ABCB1 2677T allele have positive effects on the methadone plasma concentration. In contrast, patients with HCV coinfection, alcohol problems, and psychiatric diseases may have a negative response to treatment. Thus, a comprehensive evaluation of treatment responses in the MMTP should include not only genetic polymorphisms in methadone metabolism and transporter proteins, but also concomitant diseases, MDIs, and poly-substance use. The results also suggest that personalized medicine may be indispensable for a better outcome of the MMTP.

  17. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  18. Examining winter visitor use in Yellowstone National Park

    Science.gov (United States)

    Mae A. Davenport; Wayne A. Freimund; William T. Borrie; Robert E. Manning; William A. Valliere; Benjamin Wang

    2000-01-01

    This research was designed to assist the managers of Yellowstone National Park (YNP) in their decision making about winter visitation. The focus of this report is on winter use patterns and winter visitor preferences. It is the author’s hope that this information will benefit both the quality of winter experiences and the stewardship of the park resources. This report...

  19. Managing NASA's International Space Station Logistics and Maintenance Program

    Science.gov (United States)

    Butina, Anthony

    2001-01-01

    The International Space Station's Logistics and Maintenance program has had to develop new technologies and a management approach for both space and ground operations. The ISS will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines - it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally completed in 2006. It has over 6,000 orbital replaceable units (ORU), and spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors. From conception to operation, the ISS requires a unique approach in all aspects of development and operations. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station for both space and ground operations. It started with the basic support concept developed for Department of Defense systems, and then it was tailored for the unique requirements of a manned space vehicle. Space logistics is a new concept that has wide reaching consequences for both space travel and life on Earth. This paper discusses what type of organization has been put into place to support both space and ground operations and discusses each element of that organization. In addition, some of the unique operations approaches this organization has had to develop is discussed.

  20. Winter Dew Harvest in Mexico City

    Directory of Open Access Journals (Sweden)

    Arias-Torres Jorge Ernesto

    2015-12-01

    Full Text Available This study presents experimental and theoretical results of winter dew harvest in México City in terms of condensation rate. A simplified theoretical model based on a steady-state energy balance on a radiator-condenser was fitted, as a function of the ambient temperature, the relative humidity and the wind velocity. A glass sheet and aluminum sheet white-painted were used as samples over the outdoor experiments. A good correlation was obtained between the theoretical and experimental data. The experimental results show that there was condensation in 68% of the winter nights on both condensers. The total winter condensed mass was 2977 g/m2 and 2888 g/m2 on the glass sheet and aluminum sheet white-painted, respectively. Thus, the condensed mass on the glass was only 3% higher than that on the painted surface. The maximum nightly dew harvests occurred during December, which linearly reduced from 50 g/m2 night to 22 g/m2 night as the winter months went by. The condensation occurred from 1:00 a.m. to 9:00 a.m., with maximum condensation rates between 6:00 a.m. and 7:00 a.m. The dew harvest can provide a partial alternative to the winter water shortage in certain locations with similar climates to the winter in Mexico City, as long as pollution is not significant.

  1. 32th Winter Workshop on Nuclear Dynamics

    CERN Document Server

    2016-01-01

    The 32nd edition of the Winter Workshop will be held 28 February - 5 March 2016, Hotel Resort Fort Royal Guadeloupe in Guadeloupe a French overseas territory, is an island group in the southern Caribbean Sea. As with previous years, the workshop will bring together scientists from all fields of nuclear physics for engaging and friendly exchanges of ideas. Much emphasis will be on the recent LHC, RHIC and SPS heavy ion results, but advances in the ongoing and future programs at FAIR, FRIB, EIC, JLab and NICA and will also be featured. The meeting will start with a welcome reception on the evening of Sunday, February 28. The workshop program will commence on Monday morning and run until Saturday. We recommend to arrive on Sunday and leave on Sunday. Talks will be as usual 25+5 minutes, there will be no parallel sessions. If you are interested in presenting your work, please fill out the registration form prior to the registration deadline. After the program committee has met we will confirm your talk via indivi...

  2. 30th Winter Workshop on Nuclear Dynamics

    CERN Document Server

    2014-01-01

    The 30th edition of the Winter Workshop will be held April 6-12th, 2014 in Hotel Galvez & Spa, Galveston, Texas, USA. As with previous years, the workshop will bring together scientists from all fields of nuclear physics for engaging and friendly exchanges of ideas.Much emphasis will be on the recent LHC and RHIC heavy ion results, but advances in the ongoing and future programs at FAIR, FRIB, NICA and JLab will also be featured. The meeting will start with a welcome reception on the evening of Sunday, April 6th. The workshop program will commence on Monday morning and run until Saturday evening. We recommend to arrive on Sunday and leave on Sunday. Talks will be as usual 25+5 minutes, there will be no parallel sessions. If you are interested in presenting your work, please fill out the registration form prior to the registration deadline. After the program committee has met we will confirm your talk via individual invitations. We will also work with the talks committees of all relevant experimenta...

  3. Routine maintenance prolongs ESP time between failures

    International Nuclear Information System (INIS)

    Hurst, T.; Lannom, R.W.; Divine, D.L.

    1992-01-01

    This paper reports that routine maintenance of electric submersible motors (ESPs) significantly lengthened the mean time between motor failures (MTBF), decreased operating costs, and extended motor run life in the Sacroc Unit of the Kelly-Snyder field in West Texas. After the oil price boom of the early 1980s. rapidly eroding profit margins from producing properties caused a much stronger focus on reducing operating costs. In Sacroc, ESP operating life and repair costs became a major target of cost reduction efforts. The routine ESP maintenance program has been in place for over 3 years

  4. Joint optimization of LORA and spares stocks considering corrective maintenance time

    Institute of Scientific and Technical Information of China (English)

    Linhan Guo; Jiujiu Fan; Meilin Wen; Rui Kang

    2015-01-01

    Level of repair analysis (LORA) is an important method of maintenance decision for establishing systems of operation and maintenance in the equipment development period. Currently, the research on equipment of repair level focuses on economic analy-sis models which are used to optimize costs and rarely considers the maintenance time required by the implementation of the main-tenance program. In fact, as to the system requiring high mission complete success, the maintenance time is an important factor which has a great influence on the availability of equipment sys-tems. Considering the relationship between the maintenance time and the spares stocks level, it is obvious that there are contra-dictions between the maintenance time and the cost. In order to balance these two factors, it is necessary to build an optimization LORA model. To this end, the maintenance time representing per-formance characteristic is introduced, and on the basis of spares stocks which is traditional y regarded as a decision variable, a de-cision variable of repair level is added, and a multi-echelon multi-indenture (MEMI) optimization LORA model is built which takes the best cost-effectiveness ratio as the criterion, the expected num-ber of backorder (EBO) as the objective function and the cost as the constraint. Besides, the paper designs a convex programming algorithm of multi-variable for the optimization model, provides solutions to the non-convex objective function and methods for improving the efficiency of the algorithm. The method provided in this paper is proved to be credible and effective according to the numerical example and the simulation result.

  5. 25 CFR 170.811 - What happens if lack of funds results in inadequate maintenance?

    Science.gov (United States)

    2010-04-01

    ... maintenance? 170.811 Section 170.811 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.811 What happens if lack of funds results in inadequate maintenance? If BIA determines that an IRR transportation facility is not being...

  6. Winter fuels report

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-04

    The Winter Fuels Report is intended to provide concise, timely information to the industry, the press, policymakers, consumers, analysts, and state and local governments on the following topics: distillate fuel oil net production, imports and stocks for all PADD's and product supplied on a US level; propane net production, imports and stocks for Petroleum Administration for Defense Districts (PADD) I, II, and III; natural gas supply and disposition, underground storage, and consumption for all PADD's; residential and wholesale pricing data for propane and heating oil for those states participating in the joint Energy Information Administration (EIA)/State Heating Oil and Propane Program; crude oil price comparisons for the United States and selected cities; and US total heating degree-days by city. This report will be published weekly by the EIA starting the first week in October 1990 and will continue until the first week in April 1991. The data will also be available electronically after 5:00 p.m. on Thursday during the heating season through the EIA Electronic Publication System (EPUB). 12 tabs.

  7. Leadership in American Indian Communities: Winter Lessons

    Science.gov (United States)

    Metoyer, Cheryl A.

    2010-01-01

    Winter lessons, or stories told in the winter, were one of the ways in which tribal elders instructed and directed young men and women in the proper ways to assume leadership responsibilities. Winter lessons stressed the appropriate relationship between the leader and the community. The intent was to remember the power and purpose of that…

  8. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  9. Observed decreases in the Canadian outdoor skating season due to recent winter warming

    International Nuclear Information System (INIS)

    Damyanov, Nikolay N; Mysak, Lawrence A; Damon Matthews, H

    2012-01-01

    Global warming has the potential to negatively affect one of Canada’s primary sources of winter recreation: hockey and ice skating on outdoor rinks. Observed changes in winter temperatures in Canada suggest changes in the meteorological conditions required to support the creation and maintenance of outdoor skating rinks; while there have been observed increases in the ice-free period of several natural water bodies, there has been no study of potential trends in the duration of the season supporting the construction of outdoor skating rinks. Here we show that the outdoor skating season (OSS) in Canada has significantly shortened in many regions of the country as a result of changing climate conditions. We first established a meteorological criterion for the beginning, and a proxy for the length of the OSS. We extracted this information from daily maximum temperature observations from 1951 to 2005, and tested it for significant changes over time due to global warming as well as due to changes in patterns of large-scale natural climate variability. We found that many locations have seen a statistically significant decrease in the OSS length, particularly in Southwest and Central Canada. This suggests that future global warming has the potential to significantly compromise the viability of outdoor skating in Canada. (letter)

  10. Observed decreases in the Canadian outdoor skating season due to recent winter warming

    Science.gov (United States)

    Damyanov, Nikolay N.; Damon Matthews, H.; Mysak, Lawrence A.

    2012-03-01

    Global warming has the potential to negatively affect one of Canada’s primary sources of winter recreation: hockey and ice skating on outdoor rinks. Observed changes in winter temperatures in Canada suggest changes in the meteorological conditions required to support the creation and maintenance of outdoor skating rinks; while there have been observed increases in the ice-free period of several natural water bodies, there has been no study of potential trends in the duration of the season supporting the construction of outdoor skating rinks. Here we show that the outdoor skating season (OSS) in Canada has significantly shortened in many regions of the country as a result of changing climate conditions. We first established a meteorological criterion for the beginning, and a proxy for the length of the OSS. We extracted this information from daily maximum temperature observations from 1951 to 2005, and tested it for significant changes over time due to global warming as well as due to changes in patterns of large-scale natural climate variability. We found that many locations have seen a statistically significant decrease in the OSS length, particularly in Southwest and Central Canada. This suggests that future global warming has the potential to significantly compromise the viability of outdoor skating in Canada.

  11. Fatty acid oxidation is required for active and quiescent brown adipose tissue maintenance and thermogenic programing

    Directory of Open Access Journals (Sweden)

    Elsie Gonzalez-Hurtado

    2018-01-01

    Full Text Available Objective: To determine the role of fatty acid oxidation on the cellular, molecular, and physiologic response of brown adipose tissue to disparate paradigms of chronic thermogenic stimulation. Methods: Mice with an adipose-specific loss of Carnitine Palmitoyltransferase 2 (Cpt2A−/−, that lack mitochondrial long chain fatty acid β-oxidation, were subjected to environmental and pharmacologic interventions known to promote thermogenic programming in adipose tissue. Results: Chronic administration of β3-adrenergic (CL-316243 or thyroid hormone (GC-1 agonists induced a loss of BAT morphology and UCP1 expression in Cpt2A−/− mice. Fatty acid oxidation was also required for the browning of white adipose tissue (WAT and the induction of UCP1 in WAT. In contrast, chronic cold (15 °C stimulation induced UCP1 and thermogenic programming in both control and Cpt2A−/− adipose tissue albeit to a lesser extent in Cpt2A−/− mice. However, thermoneutral housing also induced the loss of UCP1 and BAT morphology in Cpt2A−/− mice. Therefore, adipose fatty acid oxidation is required for both the acute agonist-induced activation of BAT and the maintenance of quiescent BAT. Consistent with this data, Cpt2A−/− BAT exhibited increased macrophage infiltration, inflammation and fibrosis irrespective of BAT activation. Finally, obese Cpt2A−/− mice housed at thermoneutrality exhibited a loss of interscapular BAT and were refractory to β3-adrenergic-induced energy expenditure and weight loss. Conclusion: Mitochondrial long chain fatty acid β-oxidation is critical for the maintenance of the brown adipocyte phenotype both during times of activation and quiescence. Keywords: Fatty acid oxidation, Brown adipose tissue, Cold induced thermogenesis, Adrenergic signaling, Adipose macrophage

  12. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  13. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    International Nuclear Information System (INIS)

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training

  14. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training.

  15. Study on how to evaluate the effectiveness of maintenance activities for giant complex plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki

    2010-01-01

    If we try to check the effectiveness of maintenance activities in nuclear power plant, it is necessary to evaluate plant performance from the viewpoint of nuclear safety and economy. So, in this paper, after the relation among maintenance optimization, maintenance performance targets, maintenance effectiveness indicator and maintenance key parameters important to nuclear safety and economy was made clear, a method to evaluate the effectiveness of maintenance activities was discussed. As a result of consideration, it was concluded that the maintenance effectiveness indicator proposed in this paper can evaluate maintenance effectiveness and can show the direction of improving existing maintenance program because the relation with maintenance performance target and maintenance key parameters is clear. (author)

  16. 25 CFR 170.805 - What are the local, tribal, and BIA roles in transportation facility maintenance?

    Science.gov (United States)

    2010-04-01

    ... transportation facility maintenance? 170.805 Section 170.805 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.805 What are the local... Road Maintenance dollars. ...

  17. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  18. Study on application of safety checklist in preventive maintenance activities

    International Nuclear Information System (INIS)

    Shi Jin; Chen Song; Liu Jingquan

    2013-01-01

    The paper describes the principles and the characteristics of safety checklist as a risk evaluation method. Examples of application of safety checklists to preventive maintenance activities such as criteria comparison and checkup items in place in nuclear power plants are illustrated in details with issues appeared in the checklist establishment. Checklist has a good application in the RCM analysis or in the actual preventive maintenance program for Chashma Nuclear Power Plant indicated by concrete instances. In the light of safety checklist which is used to sustain preventive maintenance as a simple and applicable risk analysis approach, we can get deep knowledge of risks of nuclear power plant to perfect preventive maintenance activities. (authors)

  19. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1993

    International Nuclear Information System (INIS)

    1993-11-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D ampersand D) Program has continued to provide surveillance and maintenance (S ampersand M) support for 34 surplus facilities. The objectives are to (1) ensure adequate containment of residual radioactive materials remaining in the facilities, (2) provide safety and security controls to minimize the potential hazards to on-site personnel and the general public, and (3) manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S ampersand M planning, (2) routine S ampersand M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance

  20. Generalized Maintenance Trainer Simulator: Development of Hardware and Software. Final Report.

    Science.gov (United States)

    Towne, Douglas M.; Munro, Allen

    A general purpose maintenance trainer, which has the potential to simulate a wide variety of electronic equipments without hardware changes or new computer programs, has been developed and field tested by the Navy. Based on a previous laboratory model, the Generalized Maintenance Trainer Simulator (GMTS) is a relatively low cost trainer that…

  1. Comparison of a low carbohydrate and low fat diet for weight maintenance in overweight or obese adults enrolled in a clinical weight management program

    Directory of Open Access Journals (Sweden)

    Curry Chelsea

    2007-11-01

    Full Text Available Abstract Background Recent evidence suggests that a low carbohydrate (LC diet may be equally or more effective for short-term weight loss than a traditional low fat (LF diet; however, less is known about how they compare for weight maintenance. The purpose of this study was to compare body weight (BW for participants in a clinical weight management program, consuming a LC or LF weight maintenance diet for 6 months following weight loss. Methods Fifty-five (29 low carbohydrate diet; 26 low fat diet overweight/obese middle-aged adults completed a 9 month weight management program that included instruction for behavior, physical activity (PA, and nutrition. For 3 months all participants consumed an identical liquid diet (2177 kJ/day followed by 1 month of re-feeding with solid foods either low in carbohydrate or low in fat. For the remaining 5 months, participants were prescribed a meal plan low in dietary carbohydrate (~20% or fat (~30%. BW and carbohydrate or fat grams were collected at each group meeting. Energy and macronutrient intake were assessed at baseline, 3, 6, and 9 months. Results The LC group increased BW from 89.2 ± 14.4 kg at 3 months to 89.3 ± 16.1 kg at 9 months (P = 0.84. The LF group decreased BW from 86.3 ± 12.0 kg at 3 months to 86.0 ± 14.0 kg at 9 months (P = 0.96. BW was not different between groups during weight maintenance (P = 0.87. Fifty-five percent (16/29 and 50% (13/26 of participants for the LC and LF groups, respectively, continued to decrease their body weight during weight maintenance. Conclusion Following a 3 month liquid diet, the LC and LF diet groups were equally effective for BW maintenance over 6 months; however, there was significant variation in weight change within each group.

  2. Barriers to wheelchair use in the winter.

    Science.gov (United States)

    Ripat, Jacquie D; Brown, Cara L; Ethans, Karen D

    2015-06-01

    To test the hypothesis that challenges to community participation posed by winter weather are greater for individuals who use scooters, manual and power wheelchairs (wheeled mobility devices [WMDs]) than for the general ambulatory population, and to determine what WMD users identify as the most salient environmental barriers to community participation during the winter. Cross-sectional survey organized around 5 environmental domains: technological, natural, physical, social/attitudinal, and policy. Urban community in Canada. Convenience sample of WMD users or their proxy (N=99). Not applicable. Not applicable. Forty-two percent identified reduced outing frequency in winter months, associated with increased age (χ(3)=6.4, P=.04), lack of access to family/friends for transportation (χ(2)=8.1, P=.04), and primary type of WMD used in the winter (scooter χ(2)=8.8, P=.003). Most reported tires/casters becoming stuck in the snow (95%) or slipping on the ice (91%), difficulty ascending inclines/ramps (92%), and cold hands while using controls or pushing rims (85%); fewer identified frozen wheelchair/scooter batteries, seat cushions/backrests, or electronics. Sidewalks/roads were reported to be problematic by 99%. Eighty percent reported needing additional help in the winter. Limited community access in winter led to a sense of loneliness/isolation, and fear/anxiety related to safety. Respondents identified policies that limited participation during winter. People who use WMDs decrease their community participation in cold weather because of multiple environmental barriers. Clinicians, researchers, and policymakers can take a multidimensional approach to mitigate these barriers in order to enhance community participation by WMD users in winter. Copyright © 2015 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.

  3. AGA predicts winter jump in residential gas price

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The American Gas Association predicts the average heating bill for residential gas consumers could increase by as much as 18% this winter. AGA Pres. Mike Baly said, Last year's winter was warmer than normal. If the 1992-93 winter is similar, AGA projects that residential natural gas heating bills will go up about 6%. If we see a return to normal winter weather, our projection show the average bill could rise by almost 18%

  4. Preventive maintenance basis: Volume 24 -- Battery -- flooded lead-acid (lead-calcium, lead antimony, plante). Final report

    International Nuclear Information System (INIS)

    Worledge, D.; Hinchcliffe, G.

    1997-12-01

    US nuclear power plants are implementing preventive maintenance (PM) tasks with little documented basis beyond fundamental vendor information to support the tasks or their intervals. The Preventive Maintenance Basis project provides utilities with the technical basis for PM tasks and task intervals associated with 40 specific components such as valves, electric motors, pumps, and HVAC equipment. This document provides a program of preventive maintenance tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. This document provides a program of preventive maintenance (PM) tasks suitable for application to flooded lead-acid batteries. The PM tasks that are recommended provide a cost-effective way to intercept the causes and mechanisms that lead to degradation and failure. They can be used, in conjunction with material from other sources, to develop a complete PM program or to improve an existing program. Users of this information will be utility managers, supervisors, system engineers, craft technicians, and training instructors responsible for developing, optimizing, or fine-tuning PM programs

  5. A genetic algorithm solution for a nuclear power plant risk-cost maintenance model

    International Nuclear Information System (INIS)

    Tong Jiejuan; Mao Dingyuan; Xue Dazhi

    2004-01-01

    Reliability Centered Maintenance (RCM) is one of the popular maintenance optimization methods according to certain kinds of priorities. Traditional RCM usually analyzes and optimizes the maintenance strategy from the viewpoint of component instead of the whole maintenance program impact. Research presented in this paper is a pilot study using PSA techniques in RCM. How to reflect the effect on component unavailability by the maintenance activities such as surveillance testing and preventive maintenance in PSA model is discussed firstly. Based on the discussion, a maintenance risk-cost model is established for global maintenance optimization in a nuclear power plant, and a genetic algorithm (GA) is applied to solve such a model to get the global optimized maintenance strategy. Finally, the result got from a simple test case based on a risk-cost model consisting of 10 components is presented

  6. Road maintenance optimization through a discrete-time semi-Markov decision process

    International Nuclear Information System (INIS)

    Zhang Xueqing; Gao Hui

    2012-01-01

    Optimization models are necessary for efficient and cost-effective maintenance of a road network. In this regard, road deterioration is commonly modeled as a discrete-time Markov process such that an optimal maintenance policy can be obtained based on the Markov decision process, or as a renewal process such that an optimal maintenance policy can be obtained based on the renewal theory. However, the discrete-time Markov process cannot capture the real time at which the state transits while the renewal process considers only one state and one maintenance action. In this paper, road deterioration is modeled as a semi-Markov process in which the state transition has the Markov property and the holding time in each state is assumed to follow a discrete Weibull distribution. Based on this semi-Markov process, linear programming models are formulated for both infinite and finite planning horizons in order to derive optimal maintenance policies to minimize the life-cycle cost of a road network. A hypothetical road network is used to illustrate the application of the proposed optimization models. The results indicate that these linear programming models are practical for the maintenance of a road network having a large number of road segments and that they are convenient to incorporate various constraints on the decision process, for example, performance requirements and available budgets. Although the optimal maintenance policies obtained for the road network are randomized stationary policies, the extent of this randomness in decision making is limited. The maintenance actions are deterministic for most states and the randomness in selecting actions occurs only for a few states.

  7. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  8. Inspection, evaluation and maintenance guidelines for reactor vessel internals in JAPAN

    International Nuclear Information System (INIS)

    Sakashita, Akihiro; Goto, Tomoya; Hirano, Shinro; Dozaki, Koji

    2010-01-01

    Inspection and Evaluation Guidelines for reactor internals has been taken into the Rules on Fitness-for–Service for Nuclear Power Plants of The Japan Society of Mechanical Engineers. It is a base of the maintenance plan of each Nuclear Power Plant. A plant maintenance methodology will have more importance to maintain the plant safety and stable plant operation. This paper introduces the systematization of the maintenance such as repair, replacement, preventive maintenance in these guidelines. Maintenance methodologies are classified follows. Repair: methodology to reinforce degraded parts by some methods or prevent progress of degradation of without replacement of the existing structure when the degradation of structure is actualized. Replacement: methodology to replace the existing structure with new one when the degradation of structure is actualized. Preventive maintenance : methodology to mitigate the damaged condition. When the maintenance methodologies are implemented in the actual plant, we have to consider the feedback of the inspection program and plant life management. (author)

  9. Stakeholders responses on health maintenance organizations ...

    African Journals Online (AJOL)

    National Health Insurance Scheme uses the services of Health Maintenance Organizations to run the scheme. This model of administering a national health insurance scheme is different from how so many other national health insurance programs are run in other parts of the world. The designing of the NHIS to include the ...

  10. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  11. Maintenance proficiency evaluation test bank

    International Nuclear Information System (INIS)

    Maier, Loran

    2003-01-01

    identify retraining and initial training needs as part of their accredited training programs. Identification of the present knowledge and skills of a potential new hire or transferee has proven to be very cost effective for some utilities. Utilities participating in the MPETB project have experienced substantial O and M cost savings through the application of MPE methodology and access to the test item data bank. One utility used MPEs for rigging during one of their outages and realized a cost savings of $227,500. Others have experienced similar savings on other maintenance tasks. (author)

  12. Root development of fodder radish and winter wheat before winter in relation to uptake of nitrogen

    DEFF Research Database (Denmark)

    Wahlström, Ellen Margrethe; Hansen, Elly Møller; Mandel, A.

    2015-01-01

    occurred. Quantitative data is missing on N leaching of a catch crop compared to a winter cereal in a conventional cereal-based cropping system. The aim of the study was to investigate whether fodder radish (Raphanus sativus L.) (FR) would be more efficient than winter wheat (Triticum aestivum L.) (WW...

  13. The meaning of nuclear winter

    International Nuclear Information System (INIS)

    Geiger, H.J.

    1987-01-01

    In this paper the author reviews the history and origins of the basic ideas underlying nuclear winter; and findings and predictions of several groups regarding this topic. The author reviews some of the further developments and scientific analyses regarding nuclear winter since the initial announcements of 1983, touching on some of the revisions and controversies and trying to indicate the current status of the field

  14. Nuclear power plant maintenance optimisation SENUF network activity

    International Nuclear Information System (INIS)

    Ahlstrand, R.; Bieth, M.; Pla, P.; Rieg, C.; Trampus, P.

    2004-01-01

    During providing scientific and technical support to TACIS and PHARE nuclear safety programs a large amount of knowledge related to Russian design reactor systems has accumulated and led to creation of a new Network concerning Nuclear Safety in Central and Eastern Europe called ''Safety of Eastern European type Nuclear Facilities'' (SENUF). SENUF contributes to bring together all stakeholders of TACIS and PHARE: beneficiaries, end users, Eastern und Western nuclear industries, and thus, to favour fruitful technical exchanges and feedback of experience. At present the main focus of SENUF is the nuclear power plant maintenance as substantial element of plant operational safety as well as life management. A Working Group has been established on plant maintenance. One of its major tasks in 2004 is to prepare a status report on advanced strategies to optimise maintenance. Optimisation projects have an interface with the plant's overall life management program. Today, almost all plants involved in SENUF network have an explicit policy to extend their service life, thus, component ageing management, modernization and refurbishment actions became much more important. A database is also under development, which intends to help sharing the available knowledge and specific equipment and tools. (orig.)

  15. Winter climate limits subantarctic low forest growth and establishment.

    Science.gov (United States)

    Harsch, Melanie A; McGlone, Matt S; Wilmshurst, Janet M

    2014-01-01

    Campbell Island, an isolated island 600 km south of New Zealand mainland (52 °S, 169 °E) is oceanic (Conrad Index of Continentality  =  -5) with small differences between mean summer and winter temperatures. Previous work established the unexpected result that a mean annual climate warming of c. 0.6 °C since the 1940's has not led to upward movement of the forest limit. Here we explore the relative importance of summer and winter climatic conditions on growth and age-class structure of the treeline forming species, Dracophyllum longifolium and Dracophyllum scoparium over the second half of the 20th century. The relationship between climate and growth and establishment were evaluated using standard dendroecological methods and local climate data from a meteorological station on the island. Growth and establishment were correlated against climate variables and further evaluated within hierarchical regression models to take into account the effect of plot level variables. Winter climatic conditions exerted a greater effect on growth and establishment than summer climatic conditions. Establishment is maximized under warm (mean winter temperatures >7 °C), dry winters (total winter precipitation <400 mm). Growth, on the other hand, is adversely affected by wide winter temperature ranges and increased rainfall. The contrasting effect of winter warmth on growth and establishment suggests that winter temperature affects growth and establishment through differing mechanisms. We propose that milder winters enhance survival of seedlings and, therefore, recruitment, but increases metabolic stress on established plants, resulting in lower growth rates. Future winter warming may therefore have complex effects on plant growth and establishment globally.

  16. Sage-grouse habitat selection during winter in Alberta

    Science.gov (United States)

    Carpenter, Jennifer L.; Aldridge, Cameron L.; Boyce, Mark S.

    2010-01-01

    Greater sage-grouse (Centrocercus urophasianus) are dependent on sagebrush (Artemisia spp.) for food and shelter during winter, yet few studies have assessed winter habitat selection, particularly at scales applicable to conservation planning. Small changes to availability of winter habitats have caused drastic reductions in some sage-grouse populations. We modeled winter habitat selection by sage-grouse in Alberta, Canada, by using a resource selection function. Our purpose was to 1) generate a robust winter habitat-selection model for Alberta sage-grouse; 2) spatially depict habitat suitability in a Geographic Information System to identify areas with a high probability of selection and thus, conservation importance; and 3) assess the relative influence of human development, including oil and gas wells, in landscape models of winter habitat selection. Terrain and vegetation characteristics, sagebrush cover, anthropogenic landscape features, and energy development were important in top Akaike's Information Criterionselected models. During winter, sage-grouse selected dense sagebrush cover and homogenous less rugged areas, and avoided energy development and 2-track truck trails. Sage-grouse avoidance of energy development highlights the need for comprehensive management strategies that maintain suitable habitats across all seasons. ?? 2010 The Wildlife Society.

  17. The Unusual Southern Hemisphere Stratosphere Winter of 2002

    Science.gov (United States)

    Newman, Paul A.; Nash, Eric R.

    2003-01-01

    The southern hemisphere stratospheric winter of 2002 was the most unusual winter yet observed in the southern hemisphere climate record. Temperatures near the edge of the Antarctic polar vortex were considerably warmer than normal over the entire course of the winter. The polar night jet was considerably weaker than normal, and was displaced more poleward than has been observed in previous winters. These record high temperatures and weak jet resulted from a series of wave events that took place over the course of the winter. The first large event occurred on 15 May, and the final warming occurred on 25 October. The propagation of these wave events from the troposphere is diagnosed from time series of Eliassen-Palm flux vectors. The wave events tended to occur irregularly over the course of the winter, and pre-conditioned the polar night jet for the extremely large wave event of 22 September. This large wave event resulted in the first ever observed major stratospheric warming in the southern hemisphere. This wave event split the Antarctic ozone hole. The combined effect of the wave events of the 2002 winter resulted in the smallest ozone hole observed since 1988.

  18. Maintenance approaches and practices in selected foreign nuclear power programs and other US industries: Review and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    1990-04-01

    The Commission published a Notice of Proposed Rule-making on Maintenance of Nuclear Power Plants on November 28, 1988, spelling out NRC's expectations in maintenance. In preparing the proposed rule, the NRC reviewed maintenance practices in other countries and considered maintenance approaches in other industries in this country. As a result of the review of maintenance practices, it was concluded that certain practices in the following areas have been found to contribute significantly to effective maintenance: (1) systems approach; (2) effectiveness monitoring; (3) technician qualifications and motivation; and (4) maintenance organization. 87 refs., 26 figs., 2 tabs.

  19. Maintenance approaches and practices in selected foreign nuclear power programs and other US industries: Review and lessons learned

    International Nuclear Information System (INIS)

    1990-04-01

    The Commission published a Notice of Proposed Rule-making on Maintenance of Nuclear Power Plants on November 28, 1988, spelling out NRC's expectations in maintenance. In preparing the proposed rule, the NRC reviewed maintenance practices in other countries and considered maintenance approaches in other industries in this country. As a result of the review of maintenance practices, it was concluded that certain practices in the following areas have been found to contribute significantly to effective maintenance: (1) systems approach; (2) effectiveness monitoring; (3) technician qualifications and motivation; and (4) maintenance organization. 87 refs., 26 figs., 2 tabs

  20. Practical considerations in developing an instrument-maintenance plan--

    International Nuclear Information System (INIS)

    Guth, M.A.S.

    1989-01-01

    The author develops a general set of considerations to explain how a consistent, well-organized, prioritized, and adequate time-allowance program plan for routine maintenance can be constructed. The analysis is supplemented with experience from the high flux isotope reactor (HFIR) at US Oak Ridge National Laboratory (ORNL). After the preventive maintenance (PM) problem was defined, the instruments on the schedule were selected based on the manufacturer's design specifications, quality-assurance requirements, prior classifications, experiences with the incidence of breakdowns or calibration, and dependencies among instruments. The effects of repair error in PM should be also studied. The HFIR requires three full-time technicians to perform both PM and unscheduled maintenance. A review is presented of concepts from queuing theory to determine anticipated breakdown patterns. In practice, the pneumatic instruments have a much longer lifetime than the electric/electronic instruments on various reactors at ORNL. Some special considerations and risk aversion in choosing a maintenance schedule