WorldWideScience

Sample records for victor karpenko project

  1. Victor Frankenstein's Institutional Review Board Proposal, 1790.

    Science.gov (United States)

    Harrison, Gary; Gannon, William L

    2015-10-01

    To show how the case of Mary Shelley's Victor Frankenstein brings light to the ethical and moral issues raised in Institutional Review Board (IRB) protocols, we nest an imaginary IRB proposal dated August 1790 by Victor Frankenstein within a discussion of the importance and function of the IRB. Considering the world of science as would have appeared in 1790 when Victor was a student at Ingolstadt, we offer a schematic overview of a fecund moment when advances in comparative anatomy, medical experimentation and theories of life involving animalcules and animal electricity sparked intensive debates about the basic principles of life and the relationship between body and soul. Constructing an IRB application based upon myriad speculations circulating up to 1790, we imagine how Victor would have drawn upon his contemporaries' scientific work to justify the feasibility of his project, as well as how he might have outlined the ethical implications of his plan to animate life from "dead" tissues. In Mary Shelley's Frankenstein, Victor failed to consider his creature's autonomy, vulnerability, and welfare. In this IRB proposal, we show Victor facing those issues of justice and emphasize how the novel can be an important component in courses or workshops on research ethics. Had Victor Frankenstein had to submit an IRB proposal tragedy may have been averted, for he would have been compelled to consider the consequences of his experiment and acknowledge, if not fulfill, his concomitant responsibilities to the creature that he abandoned and left to fend for itself.

  2. Victor Gruen: the environmental Heart

    NARCIS (Netherlands)

    Zuccaro Marchi, L.

    2017-01-01

    Victor Gruen is the pioneer of the regional shopping centre, he is the “Mall Maker”, which, is also the title of a book by M. Jeffrey Hartwick about this Austrian-born architect. Well known for his first commercial projects, which have been copied and analysed worldwide, mostly negatively

  3. Memorial symposium for Victor Weisskopf.

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    A memorial symposium for Victor Weisskopf, CERN Director-General from 1961 to 1965, was held at CERN on 17 September 2002. Photo 01: L. Maiani: Welcome.Photo 02: J. D. Jackson: Highlights from the career and scientific works of Victor F. Weisskopf.Photos 05 09: M. Hine and K. Johnsen: Working with Viki at CERN.Photo 10: M. Jacob: Knowledge and Wonder.Photo 14: K. Worth (Viki's daughter): Reminiscences.

  4. VICTOR HAGEA AMAZING!

    DEFF Research Database (Denmark)

    Isar, Nicoletta

    VICTOR HAGEA's "Amazing!" includes 28 amazing artworks of Victor Hagea (lives and works in Munchen /Germany) and 14 critical essays and work reviews by Nicoletta Isar ((lives and works in Copenhagen /Denmark).  Size 12¼ x 10 in / 31,5 x 25 cm,  66 color pages, hardcover and  Busines Replay Card......, quality printed in Europe. Marketing and distribution through large book wholesalers and ecommerce channels in US bookstores and eCommerce internationally including Barnes and Noble, Borders, Amazon in USA, Amazon Canada, Amazon France, Amazon Germany, Amazon UK, Amazon Australia and others. The book...... is created by Petru A. RUSSU, editor and publisher of World of Art (WOA), fine artist (lives and works in London and Stockholm)....

  5. Memorial Symposium for Victor Weisskopf

    CERN Multimedia

    2002-01-01

    Victor 'Viki' Weisskopf, former Director General of CERN from 1961 to 1965, passed away five months ago. At that time, the Bulletin dedicated its coverpage to this brilliant physicist (19-20/2002). Now, CERN has organised a Memorial Symposium for next Tuesday 17 September, where you are cordially invited. This tribute will include the following speechs: L. Maiani: Welcome J. D. Jackson: Highlights from the career and scientific works of Victor F. Weisskopf M. Hine and K. Johnsen: Working with Viki at CERN M. Jacob: Knowledge and Wonder A member of Viki's family: Reminiscences. The Memorial Symposium will take place in the Main Auditorium at 15h. Drinks will be served in Pas Perdus at 17h 30.

  6. Memorial Symposium for Victor Weisskopf

    CERN Multimedia

    CERN. Geneva. Audiovisual Unit

    2002-01-01

    This tribute will include the following speechs: L. Maiani: Welcome J. D. Jackson: Highlights from the career and scientific works of Victor F. Weisskopf M. Hine and K. Johnsen: Working with Viki at CERN M. Jacob: Knowledge and Wonder A member of Viki's family: Reminiscences

  7. 1661-IJBCS-Article-Victor Kimpouni

    African Journals Online (AJOL)

    hp

    Victor KIMPOUNI *, Paul MBOU,Gabriel GAKOSSO et Marcel MOTOM. École Normale Supérieure, Université Marien ...... Kinshasa- Brazzaville. Jardin Botanique. National de Belgique : Bruxelles. Peters CM. 1997. Exploitation soutenue de produits forestiers autres que le bois en forêt tropicale humide : manuel d'initiation ...

  8. Interview with Chilean Activist Victor Toro

    Directory of Open Access Journals (Sweden)

    Clyde Lanford Smith

    2008-07-01

    Full Text Available Victor Toro Ramirez. Immigrant activist in the United States, ex-political prisoner of the military dictatorship in Chile and in process of deportation by the Bush government and its immigration scandal.

  9. Broglie, Prof. Louis Victor de

    Indian Academy of Sciences (India)

    Home; Fellowship. Fellow Profile. Elected: 1951 Honorary. Broglie, Prof. Louis Victor de. Nobel Laureate (Physics) - 1929. Date of birth: 15 August 1892. Date of death: 19 March 1987. YouTube; Twitter; Facebook; Blog. Academy News. IAS Logo. 29th Mid-year meeting. Posted on 19 January 2018. The 29th Mid-year ...

  10. Victor Bérard et la Macédoine

    Directory of Open Access Journals (Sweden)

    Ivan Savev

    2011-01-01

    Full Text Available Un helléniste convaincu, Victor Bérard, en vient, au début du XXe siècle à soutenir l’existence de « Macédoniens » et le slogan « la Macédoine aux Macédoniens”.Le Congrès de Berlin en 1878 avait laissé la Macédoine aux mains des Ottomans. La Grèce, la Serbie et la Bulgarie, parvenues à ses limites et prévoyant le retrait futur des Ottomans peaufinent les arguments linguistiques et historiques qui justifieront leurs revendications territoriales. Victor Bérard, un helléniste respecté et bon connaisseur de la région sud balkanique, effectue des enquêtes en Macédoine en 1896 et 1903 qu’il publie à Paris.Cette étude montre comment, dans le contexte de la propagande nationaliste des prétendants à la possession de la Macédoine, Victor Bérard en vient progressivement à affirmer qu’il existe une population autochtone, les Macédoniens. Il soutient leur programme pour la constitution d’une fédération ou confédération avec le slogan « la Macédoine aux Macédoniens » ce qui fait toute l’actualité de ses ouvrages.In 1878, the Congress of Berlin had left Macedonia in the hands of the Ottomans. Greece, Serbia and Bulgaria had reached its limits. Anticipating the Ottoman retreat, they polish language and historical arguments that will justify their territorial claims. Victor Bérard, a respected Hellenist and a good expert of the southern Balkans, is doing researches in Macedonia in 1896 and 1903. These will be later published in Paris.This study shows how, in the context of the nationalist propaganda build-up made by the candidates for the possession of Macedonia, Victor Bérard comes progressively to assert the existence of a native population: the Macedonians. He supports their program for the forming of a federation or confederation which slogan would be “Macedonia to Macedonians”. This makes his works very topical.

  11. Victor Frankenstein, um Prometeu moderno? Sob o olhar do imaginário educacional

    Directory of Open Access Journals (Sweden)

    Alberto Filipe Ribeiro de Abreu Araújo

    2014-12-01

    Full Text Available A nossa abordagem de Frankenstein centrou-se na revisitação do personagem Victor Frankenstein mais do que na sua criação pois só podemos compreender e explicar quem o monstro se tornou através do seu criador. O mito de Frankenstein é passível de múltiplas leituras. Dentro delas privilegiamos a educacional. Neste contexto desenvolvemos a nossa argumentação com base em três perguntas: 1ª. Quem era este Victor Frankenstein segundo Mary Shelley?; 2ª. Quem pensamos nós ser Victor Frankenstein?; 3ª. Será que Victor Frankenstein é, verdadeiramente, um novo Prometeu, ou este Prometeu, de facto, nunca se chegou a cumprir? Concluímos com um enfoque educacional respondendo negativamente à terceira pergunta.

  12. "Victor the Wild Boy" as a Teaching Tool for the History of Psychology

    Science.gov (United States)

    Nawrot, Elizabeth

    2014-01-01

    The article describes an innovative technique for teaching the History of Psychology (HoP) using the story of Victor the "Wild Boy" of Aveyron. Students were given both a traditional history textbook and assignments, along with a novel on the life of Victor and a themed writing assignment. The goal was to elicit connections between…

  13. Stratégies de captation et de persuasion du sujet communicant Victor Hugo

    Directory of Open Access Journals (Sweden)

    Ida Lucia Machado

    2011-11-01

    Full Text Available Resumo: Este artigo propõe uma abordagem discursiva de um texto ficcional, mais especificamente, de um texto literário: trata-se do poema “Souvenir de la nuit du quatre” de Victor Hugo. Partindo desse enfoque, quisemos mostrar como foram elaboradas estratégias linguareiras que visam seduzir e persuadir o leitor; entre elas destacamos os diferentes papéis e a ironia amarga que está em sua base.Palavras-chave: Literatura francesa; Victor Hugo; Souvenir de la nuit du quatre; análise do discurso; persuasão; ironia.Résumé: Cet article propose une approche discursive d’un texte de fiction, plus spécifiquement, d’un texte littéraire: il s’agit du poème “Souvenir de la nuit du quatre” de Victor Hugo. Dans cette perspective, nous avons voulu montrer comment ont été mises en place des stratégies langagières visant la captation du lecteur, parmi elles, nous soulignons les différents rôles assumés par les voix qui “parlent” dans le poème et l’ironie amère qui s’en dégage.Mots-clés: Littérature française; Victor Hugo; Souvenir de la nuit du quatre; analyse du discours; persuasion; ironie.Keywords: French literature; Victor Hugo; Souvenir de la nuit du quatre; discourse analysis; persuasion; irony.

  14. Victor Hugo, ‚Les Misérables´ (1862)

    OpenAIRE

    Krauss, Henning

    1999-01-01

    Victor Hugo, ‚Les Misérables´ (1862). - In: 19. Jahrhundert - Roman / Friedrich Wolfzettel (Hrsg.). - Tübingen : Stauffenburg-Verl., 1999. - S. 185-218. - (Stauffenburg Interpretation : Französische Literatur)

  15. 50 years with Hardy spaces a tribute to Victor Havin

    CERN Document Server

    Kisliakov, Sergei; Nikolski, Nikolai

    2018-01-01

    Written in honor of Victor Havin (1933–2015), this volume presents a collection of surveys and original papers on harmonic and complex analysis, function spaces and related topics, authored by internationally recognized experts in the fields. It also features an illustrated scientific biography of Victor Havin, one of the leading analysts of the second half of the 20th century and founder of the Saint Petersburg Analysis Seminar. A complete list of his publications, as well as his public speech "Mathematics as a source of certainty and uncertainty", presented at the Doctor Honoris Causa ceremony at Linköping University, are also included. .

  16. [Antoine Béchamp and Victor Cornil Memento for Romanian pharmacy, chemistry and medicine].

    Science.gov (United States)

    Buiuc, D; Pânzaru, Carmen

    2008-01-01

    Today we commemorate a century from the death of two Romanian loving scientists: Antoine Béchamp (1816- March 31 1908), pharmacist, chemist and physician, professor at the Universities of Strasbourg, Montpellier and Lille, and Victor Cornil (1837- April 14 1908), physician, histopathologist and bacteriologist, professor of the University of Medicine in Paris, co-author with Victor Babeş on the first ever Bacteriological Treaty.

  17. FIGURATIVE LANGUAGE FOUND IN VICTOR HUGO’S LES MISERABLE NOVEL: A SEMANTICS APPROACH

    Directory of Open Access Journals (Sweden)

    Hotma Hutasoit

    2016-04-01

    Full Text Available Penelitian ini membahas terjadinya bahasa kiasan dalam karya Victor Hugo yang berjudul Les Miserable melalui pendekatan semantik. Tujuan skripsi ini adalah (1 untuk memahami bahasa kiasan perbandingan dan pertentangan yang di temukan dalam novel “Les Miserables” karya Victor Hugo,(2 untuk memahami bahasa kiasan hubungan yang di temukan dalam novel “Les Miserables” karya Victor Hugo, (3 untuk memahami bahasa kiasan perulangan yang di temukan dalam novel “Les Miserables” karya Victor Hugo. Peneliti didukung oleh teori Leech (1981 dalam semantik terutama untuk makna konotasi dan Dancygier dan Sweetser (2014, Keraf (1994 dan Cruse (2006 untuk bahasa kiasan. Metode kualitatif digunakan dalam penelitian ini dan penelitian pustaka sebagai teknik yang digunakan untuk mengumpulkan data. Peneliti mengambil 55 sampel dari bahasa kiasan dari novel. Bahasa kiasan perbandingan dan pertentangan yaitu 3 personifikasi, 6 metafora, 6 simile, 6 hiperbola, 2 litotes, and 5 paradox. Bahasa kiasan hubungan yaitu 1 metonimi, 6 sinekdot, 4 alusi, dan 1elipsis. Bahasa kiasan perulangan yaitu 2 pleonasme, 2 klimaks, 1 anti-klimaks, 6 retorika, dan 4 repetisi.Temuan dari penelitian ini adalah dari 55 sampel dari bahasa kiasan yang ditemukan dalam novel, peneliti menemukan yang paling banyak 28 bahasa kiasan yang terjadi pada majas perbandingan dan pertentangan, diikuti denagn 15 bahasa kiasan yang terjadi pada majas perulangan, dan yang paling sedikit 12 bahasa kiasan yang terjadi pada majas hubungan dari setiap kategori.

  18. Victor Burgin: Prostředí fotografie

    OpenAIRE

    Hrabina, Martin

    2015-01-01

    The dissertation is following both theoretical and practical sides of Victor Burgin's early work. The structure of this thesis mainly reflects a hybrid attitude of the artist/theorist - the text digress from theoretical comments to related art works which are arranged chronologically. The principal focus lies in Burgin's concers for ideological, social and cultural impacts of photographic advertising practice in Great Britain during the 1970s which he assesed through theories derived from mar...

  19. LINGUA TERTII IMPERII. VICTOR KLEMPERERS DIARISTISCHE ERÖRTERUNGEN ZUR ANTISEMITISCHEN HASSREDE

    Directory of Open Access Journals (Sweden)

    Arvi SEPP

    2010-11-01

    Full Text Available Victor Klemperers Tagebücher Ich will Zeugnis ablegen bis zum letzten: Tagebücher 1933-1945 haben nach ihrem Erscheinen Mitte der 1990er Jahre ein starkes Echo gefunden und gehören inzwischen zum Kanon der Tagebuchliteratur. Das zweibändige, während der nationalsozialistischen Diktatur entstandene Tagebuchwerk beschreibt die Lebenswelt eines deutsch-jüdischen Verfolgten im Dritten Reich. Der Antisemitismus zwang den Philologen zu einer Auseinandersetzung mit dem Relevanzverlust seiner Assimilationsbemühungen und seiner Kennzeichnung als Jude. Eine rekurrente Kompensationstaktik gegen seine erzwungene Randstellung besteht in der sprachkritischen Demontierung des Rassendenkens, um die Ungültigkeit des Antisemitismus nachzuweisen. Die Beobachtungen zur Lingua Tertii Imperii, die er in den Tagebuchblättern aufschrieb, wurden immer mehr zu seinem eigentlichen Werk. Das Tagebuch ist vor diesem Hintergrund in weiten Teilen zum Arbeitsjournal für die Sprachund Kulturanalysen Klemperers geworden. Der Interdependenz von Sprachkritik und Mentalitätsgeschichte in Klemperers Analyse der Sprache des Dritten Reiches gilt im vorliegenden Aufsatz das Hauptinteresse. Im ersten Teil wird der Frage nachgegangen, auf welche Art und Weise Victor Klemperer in seinen Notizen die Beziehung zwischen Sprache, Ideologie und Mentalität verstand. Im zweiten Teil wird unter Rückgriff auf Judith Butler und Louis Althusser in den Vordergrund gerückt, wie Victor Klemperer im Tagebuch vor Augen führt, dass das verletzende Sprechen gegen Juden im Nationalsozialismus eine subjektkonstituierende Wirkung hatte. Im letzten Teil des Aufsatzes gilt das Hauptaugenmerk der vom Tagebuchautor festgestellten diskursiven Einverleibung antisemitischer Rhetorik durch die verfolgte jüdische Bevölkerung.

  20. Obituary Professor Victor Weisskopf - atom-bomb and CERN physicist

    CERN Multimedia

    Dalyell, T

    2002-01-01

    The rise of Nazism brought horror, humiliation, death and torture to so many free-thinking people - Jews, and other minorities. There were some lucky ones, like the Weisskopf family, who were able to escape. Victor Weisskopf was born and brought up in Austria in the spirit of German culture and said that he considered his transfer from Europe to the USA an invaluable source of intellectual enrichment (2 pages).

  1. Sir Victor Horsley (1857-1916): pioneer of neurological surgery.

    Science.gov (United States)

    Tan, Tze-Ching; Black, Peter McL

    2002-03-01

    Immortalized in surgical history for the introduction of "antiseptic wax," Sir Victor Horsley played a pivotal role in shaping the face of standard neurosurgical practice. His contributions include the first laminectomy for spinal neoplasm, the first carotid ligation for cerebral aneurysm, the curved skin flap, the transcranial approach to the pituitary gland, intradural division of the trigeminal nerve root for trigeminal neuralgia, and surface marking of the cerebral cortex. A tireless scientist, he was a significant player in discovering the cure for myxedema, the eradication of rabies from England, and the invention of the Horsley-Clarke stereotactic frame. As a pathologist, Horsley performed research on bacteria and edema and founded the Journal of Pathology. Horsley's kindness, humility, and generous spirit endeared him to patients, colleagues, and students. Born to privilege, he was nonetheless dedicated to improving the lot of the common man and directed his efforts toward the suffrage of women, medical reform, and free health care for the working class. Knighted in 1902 for his many contributions to medicine, Sir Victor met an untimely death during World War I from heat stroke at the age of 59. An iconoclast of keen intellect, unlimited energy, and consummate skill, his life and work justify his epitaph as a "pioneer of neurological surgery."

  2. Representing Bodies. Victor Brauner’s Hybrids, Fragments and Mechanisms

    Directory of Open Access Journals (Sweden)

    Irina Cărăbaş

    2007-05-01

    emotional attachment. The French culture had been set long ago as a model for the entire Romanian modern culture and institutions. Consequently it is not surprising that poets and artists, including Victor Brauner, chosed to live and work in Paris in order to feel closer to what was considered to be the origin. Victor Brauner is discussed both in the context of the Romanian avant-garde and in the history of the French surrealism, but one cannot detect any tension between center and periphery. One motivation can be found in the myth he creates for himself. Meanwhile it is obvious that he wanted to identify himself with the French surrealism. Once settled in France he paid great attention to the theories and to the artists André Breton promoted. I will discuss the myth of the artist as well as the threads which connect Brauner to other artistic strategies bringing forth the body problem. Almost always his paintings and drawings display the ineluctable presence of a metamorphic body within no narrative construction. This preoccupation informed every stage of his career as he dedicated it the greatest energies of his artistic inventiveness. Before going into the subject, one needs to frame Brauner in a larger picture.

  3. 2014’s Presidential elections: Victor Ponta and the surprise of failure

    Directory of Open Access Journals (Sweden)

    Sabin Drăgulin

    2015-12-01

    Full Text Available This study aims to analyze Victor Ponta’s electoral campaign as a candidate of the PSD-UNPR-PC alliance, in November 2014. The main working hypotheses that have been demonstrated during this study concern the main stake of these elections.

  4. Empire, Nationalism and the Jewish Question: Victor Adler and Otto Bauer

    Directory of Open Access Journals (Sweden)

    Wolfgang Maderthaner

    2015-12-01

    Full Text Available This paper uses the life and thought of two important figures in the history of Austrian socialism—Victor Adler and Otto Bauer—as a prism through which to examine the complex relationship between German nationalism, the Jewish Question and pro-Habsburgism among the early leadership of the Austrian Social Democratic Party.

  5. Sir Victor Horsley: pioneer craniopharyngioma surgeon.

    Science.gov (United States)

    Pascual, José M; Prieto, Ruth; Mazzarello, Paolo

    2015-07-01

    Sir Victor Horsley (1857-1916) is considered to be the pioneer of pituitary surgery. He is known to have performed the first surgical operation on the pituitary gland in 1889, and in 1906 he stated that he had operated on 10 patients with pituitary tumors. He did not publish the details of these procedures nor did he provide evidence of the pathology of the pituitary lesions operated on. Four of the patients underwent surgery at the National Hospital for Neurology and Neurosurgery (Queen Square, London), and the records of those cases were recently retrieved and analyzed by members of the hospital staff. The remaining cases corresponded to private operations whose records were presumably kept in Horsley's personal notebooks, most of which have been lost. In this paper, the authors have investigated the only scientific monograph providing a complete account of the pituitary surgeries that Horsley performed in his private practice, La Patologia Chirurgica dell'Ipofisi (Surgical Pathology of the Hypophysis), written in 1911 by Giovanni Verga, Italian assistant professor of anatomy at the University of Pavia. They have traced the life and work of this little-known physician who contributed to the preservation of Horsley's legacy in pituitary surgery. Within Verga's pituitary treatise, a full transcription of Horsley's notes is provided for 10 pituitary cases, including the patients' clinical symptoms, surgical techniques employed, intraoperative findings, and the outcome of surgery. The descriptions of the topographical and macroscopic features of two of the lesions correspond unmistakably to the features of craniopharyngiomas, one of the squamous-papillary type and one of the adamantinomatous type. The former lesion was found on necropsy after the patient's sudden death following a temporal osteoplastic craniectomy. Surgical removal of the lesion in the latter case, with the assumed nature of an adamantinomatous craniopharyngioma, was successful. According to the

  6. 75 FR 36153 - Surety Companies Acceptable on Federal Bonds-Terminations: Victore Insurance Company

    Science.gov (United States)

    2010-06-24

    ... from this company, and bonds that are continuous in nature should not be renewed. The Circular may be... DEPARTMENT OF THE TREASURY Fiscal Service Surety Companies Acceptable on Federal Bonds--Terminations: Victore Insurance Company AGENCY: Financial Management Service, Fiscal Service, Department of the...

  7. Victor Nikolaevich Shitov (1947–2013

    Directory of Open Access Journals (Sweden)

    Zeleneev Yuriy A.

    2013-12-01

    Full Text Available The article is dedicated to the memory of Victor Nikolaevich Shitov (October 1, 1947-October 31, 2013, who had been the intellectual leader of the archaeologists of the Republic of Mordovia for many years. The basic stages of his scientific biography are elucidated. The first independent studies conducted by V.N. Shitov were associated with the Shoksha burial ground referring to the Ryazan-Oka culture. Since then, the ancient Mordovian culture of the 1st millennium AD had been playing the dominant role in his studies. In 1976, V.N. Shitov became a research fellow of the sector of Archeology and Ethnography, the Mordovian Research Institute of language, literature, history and economics. The last period of his scientific activity was connected with the preparation and organizational work on the multi-volume edition “The archaeology of the Mordovian land”.

  8. La parole manifestaire : lecture de la préface des orientales de Victor Hugo

    Directory of Open Access Journals (Sweden)

    Larissa Drigo Agostinho

    2009-01-01

    Full Text Available We intend here to read the preface of Victor Hugo’s Orientales after the contemporary criticism that establish the manifesto (and similar texts such as the preface as a literary genre, with particular language and other characteristics.

  9. Victor's justice: atrocities in postwar Nigeria.

    Science.gov (United States)

    Omaka, Arua Oko

    2016-01-01

    The Nigerian Government's declaration of 'no victor, no vanquished' after the capitulation of Biafra on 12 January 1970, was applauded as the right step towards reconciliation and transition from war to peace. Despite this declaration and assurance of amnesty, the Nigerian Government and its soldiers still engaged in acts that amounted to retributive justice. They starved and killed innocent Biafran civilians, looted their property and raped their women. Surprisingly, these postwar atrocities committed against former Biafrans have been largely ignored in the historiography of the Nigeria-Biafra War. This paper seeks to fill the gap in the war literature by interrogating Nigerian Government's attitude towards the postwar humanitarian crisis and crimes against humanity in former Biafra. The paper argues that former Biafrans were not fully reintegrated into the Nigerian society and that the Nigerian Government deliberately neglected them to die in large numbers, thereby making it difficult for the war victims to recover from the hardships of the conflict.

  10. Mapping and characterization of vicriviroc resistance mutations from HIV-1 isolated from treatment-experienced subjects enrolled in a phase II study (VICTOR-E1).

    Science.gov (United States)

    McNicholas, Paul M; Mann, Paul A; Wojcik, Lisa; Qiu, Ping; Lee, Erin; McCarthy, Michael; Shen, Junwu; Black, Todd A; Strizki, Julie M

    2011-03-01

    In the phase 2 VICTOR-E1 study, treatment-experienced subjects receiving 20 mg or 30 mg of the CCR5 antagonist vicriviroc (VCV), with a boosted protease containing optimized background regimen, experienced significantly greater reductions in HIV-1 viral load compared with control subjects. Among the 79 VCV-treated subjects, 15 experienced virologic failure, and of these 5 had VCV-resistant virus. This study investigated the molecular basis for the changes in susceptibility to VCV in these subjects. Sequence analysis and phenotypic susceptibility testing was performed on envelope clones from VCV-resistant virus. For select clones, an exchange of mutations in the V3 loop was performed between phenotypically resistant clones and the corresponding susceptible clones. Phenotypic resistance was manifest by reductions in the maximum percent inhibition. Clonal analysis of envelopes from the 5 subjects identified multiple amino acid changes in gp160 that were exclusive to the resistant clones, however, none of the changes were conserved between subjects. Introduction of V3 loop substitutions from the resistant clones into the matched susceptible clones was not sufficient to reproduce the resistant phenotype. Likewise, changing the substitutions in the V3 loops from resistant clones to match susceptible clones only restored susceptibility in 1 clone. There were no clearly conserved patterns of mutations in gp160 associated with phenotypic resistance to VCV and mutations both within and outside of the V3 loop contributed to the resistance phenotype. These data suggest that genotypic tests for VCV susceptibility may require larger training sets and additional information beyond V3 sequences.

  11. Kuidas tudengid Lasnamäed väänasid / Victor Enrich, Sille Pihlak ; intervjueerinud Hendrik Alla

    Index Scriptorium Estoniae

    Enrich, Victor, 1967-

    2016-01-01

    Kunstiakadeemia arhitektuuriosakonna üliõpilased uurisid töötoas "Kuidas väänata maju ilma viga saamata", mida võiks ette võtta Lasnamäega. Intervjuu juhendajate, hispaania fotograafi Victor Enrichi ja arhitekt Sille Pihlakuga

  12. Victor Assis Brasil: a importância do período na Berklee School of Music (1969-1974 em seu estilo composicional Victor Assis Brasil: the importance of the Berklee School of Music period (1969-1974 on his compositional style

    Directory of Open Access Journals (Sweden)

    Marco Túlio de Paula Pinto

    2011-06-01

    Full Text Available Discussão sobre o papel do ambiente musical de Boston, especialmente da Berklee School of Music entre 1969 e 1974, no desenvolvimento do estilo composicional e das habilidades como arranjador de Victor Assis Brasil (1945-1981 e seus reflexos na parcela de sua produção musical que apresenta a mistura de elementos de música clássica, jazz e música brasileira.Discussion about the influence of the musical environment of Boston, especially that of the Berklee School of Music, between 1969 and 1974, on the development of the compositional style and arranging skills of Brazilian saxophone player and composer Victor Assis Brasil. (1945-1981, and its reflexes in his musical production which mixes elements from classical music, jazz and Brazilian popular music.

  13. Victor W. Page's Early Twentieth-Century Automotive and Aviation Books: "Practical Books for Practical Men."

    Science.gov (United States)

    Brockmann, R. John

    1996-01-01

    Discusses Victor Page, one of the first people to make a living as a technical communicator. Focuses on his 33 automotive and aviation books, popular with the public and critics, which contained information on novel technology, profuse illustrations, and easy-to-access information. States that Page published quickly, had firsthand expertise, and…

  14. 75 FR 42445 - Yakov Kobel and Victor Berkovich v. Hapag-Lloyd America, Inc., Limco Logistics, Inc., and...

    Science.gov (United States)

    2010-07-21

    ... FEDERAL MARITIME COMMISSION [Docket No. 10-06] Yakov Kobel and Victor Berkovich v. Hapag-Lloyd America, Inc., Limco Logistics, Inc., and International TLC, Inc.; Notice of filing of complaint and.... (``Hapag-Lloyd''), Limco Logistics, Inc. (``Limco''), and International TLC, Inc. (``Int'l TLC...

  15. Victor Henri: 111 years of his equation.

    Science.gov (United States)

    Cornish-Bowden, Athel; Mazat, Jean-Pierre; Nicolas, Serge

    2014-12-01

    Victor Henri's great contribution to the understanding of enzyme kinetics and mechanism is not always given the credit that it deserves. In addition, his earlier work in experimental psychology is totally unknown to biochemists, and his later work in spectroscopy and photobiology almost equally so. Applying great rigour to his analysis he succeeded in obtaining a model of enzyme action that explained all of the observations available to him, and he showed why the considerable amount of work done in the preceding decade had not led to understanding. His view was that only physical chemistry could explain the behaviour of enzymes, and that models should be judged in accordance with their capacity not only to explain previously known facts but also to predict new observations against which they could be tested. The kinetic equation usually attributed to Michaelis and Menten was in reality due to him. His thesis of 1903 is now available in English. Copyright © 2014 Elsevier B.V. and Société française de biochimie et biologie Moléculaire (SFBBM). All rights reserved.

  16. "Undoubtedly a Powerful Influence": Victor Henry's "Antinomies linguistiques" (1896) with an Annotated Translation of the First Chapter.

    Science.gov (United States)

    Joseph, John E.

    1996-01-01

    Discusses Victor Henry's innovative presentation of some underlying contradictions in the premises on which linguistics is founded, cast in the Kantian form of antinomies. The review argues that no science remains more strongly contested than linguistics, a science whose origins are paradoxical and that contains outdated concepts. (30 references)…

  17. ‘To Serve and Protect’: The Ends of Harm by Victor Tadros

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2013-01-01

    In The Ends of Harm Victor Tadros develops an alternative to consequentialist, and non-consequentialist retributivist, accounts of the justifiability of punishment: the duty view. Crucial to this view is the claim that wrongdoers incur an enforceable duty to remedy their wrongs. They cannot undo...... to Tadros the ‘means principle’ that we should not harm others as a means, properly construed, does not apply to cases where the victim has an enforceable duty to bear the kind of harm that he or she is being made to suffer. In this article, I shall express reservations about Tadros’ defense...... and interpretation of the means principle. In presenting his position, Tadros also sets out some interesting anti-retributivist considerations casting doubt on the idea that wrongdoers’ suffering is non-instrumentally good. I shall challenge these. Finally, I shall suggest that the duty view may have...

  18. [The marvels of the incarnated man. Victor Melcior and the redefinition of mediumship (1901)].

    Science.gov (United States)

    Graus, Andrea

    2015-01-01

    Towards the end of the 19th century, new medico-psychological approaches were applied to mediumship through the scientific study of spiritualist phenomena. The spiritualist idea of the medium was replaced with the notion of the medium as an unstable human being capable of emanating psychic forces unconsciously. This paper analyses the redefinition of mediumship through the polemical articles of the Catalan physician Victor Melcior. On one hand, this microhistory allows the local debate to be placed within the scientific international context, describing the relationships among spiritualism, medicine and psychopathology at that time. On the other hand, it permits analysis of the reactions of some spiritualists to Melcior's theories and of the consequences of this debate for spiritualism in general.

  19. Spiritual Evolution as a Metamorphose (on the base of Victor Pelevin Novel "Life of Insects"

    Directory of Open Access Journals (Sweden)

    Tetyana Shevchuk

    2013-08-01

    Full Text Available The article deals with the aesthetic paradigm of the novel "Life of Insects" (1993, written by well-known Russian writer Victor Pelevin. Spiritual evolution or degradation of the heroes is represented by their metamorphosis from person to insect or vice versa. Actual questions of the novel are focused on the problems of spiritual vacuum, lost dignity, the meaning of life, the relationship to life as most rare and precious gift, the horror to live at the level of animal existence. The author models the reality, in which the insect mask captures the essence of the person. The focus is on the anthropocentric code of the novel, the evolutionary and regressive reasons, connected with the transmutations of the heroes.

  20. A French description of German psychology laboratories in 1893 by Victor Henri, a collaborator of Binet.

    Science.gov (United States)

    Nicolas, Serge; Barnes, Marissa E; Murray, David J

    2015-05-01

    There is a rich tradition of writings about the foundation of psychology laboratories, particularly in the United States but also in France. Various documents exist concerning former German laboratories in American and French literature. But the most interesting French paper was certainly written by a young psychologist named Victor Henri (1872-1940) who was a close collaborator of Alfred Binet (1857-1911) in the 1890s. Visiting various psychology laboratories, he wrote, in 1893, a clear description of the laboratories of Wundt, G. E. Müller, Martius and Ebbinghaus. An English translation is given of Henri's paper and the historical importance of his contribution is here expounded by contrasting the German and French psychologies of the time.

  1. Fast, global, and entrepreneurial: supply chain management, Hong Kong style. An interview with Victor Fung. Interview by Joan Magretta.

    Science.gov (United States)

    Fung, V

    1998-01-01

    Li & Fung, Hong Kong's largest export trading company, has been an innovator in supply chain management--a topic of increasing importance to many senior executives. In this interview, chairman Victor Fung explains both the philosophy behind supply chain management and the specific practices that Li & Fung has developed to reduce costs and lead times, allowing its customers to buy "closer to the market." Li & Fung has been a pioneer in "dispersed manufacturing." It performs the higher-value-added tasks such as design and quality control in Hong Kong, and outsources the lower-value-added tasks to the best possible locations around the world. The result is something new: a truly global product. To produce a garment, for example, the company might purchase yarn from Korea that will be woven and dyed in Taiwan, then shipped to Thailand for final assembly, where it will be matched with zippers from a Japanese company. For every order, the goal is to customize the value chain to meet the customer's specific needs. To be run effectively, Victor Fung maintains, trading companies have to be small and entrepreneurial. He describes the organizational approaches that keep the company that way despite its growing size and geographic scope: its organization around small, customer-focused units; its incentives and compensation structure; and its use of venture capital as a vehicle for business development. As Asia's economic crisis continues, chairman Fung sees a new model of companies emerging--companies that are, like Li & Fung, narrowly focused and professionally managed.

  2. 8th February 2011-Rector Universidad Autónoma de Sinaloa Mexico Dr Victor Antonio Corrales Burgeño-Mexico-visiting ALICE cavern and tunnel with ALICE Spokesperson P. Giubellino

    CERN Multimedia

    Maximilien Brice

    2011-01-01

    Photo 1,3-14:The delegation visiting ALICE cavern Photo 2:Dra. Beatriz E. Rodríguez Pérez\tDirectora del Centro de Políticas de Género para la igualdad entre Hombres y Mujeres,Dr Victor Antonio Corrales Burgeño,P. Giubellino Photo 15-29:The delegation visiting LHC Tunnel Photo 30-57:Signature of the Guest Book with CERN Director-General R. Heuer and Head of International Relations F. Pauss Photo 58:Adviser for Mexico J. Salicio,ALICE Collaboration Universidad Autonoma de Sinaloa I. Leon Monzon,ALICE Collaboration Centro Invest. Estudios Avanz. IPN (Cinnestav) G. Herrera Corral,R. Heuer,Dr Victor Antonio Corrales Burgeño,F. Pauss,Dra. Beatriz E. Rodríguez Pérez,Directora de Relaciones InternacionalesMC. América M. Lizárraga González

  3. VICTOR BERGER’S DANGEROUS IDEAS: Censoring The Mail To Preserve National Security During World War I

    Directory of Open Access Journals (Sweden)

    Philip M. Glende

    2008-01-01

    Full Text Available During World War I, the postmaster general conducted a vigorous campaign to stop the distribution of radical periodicals. Victor L. Berger, the socialist publisher of the Milwaukee Leader in Wisconsin, was among the first targets. Without any court review, Berger was found in violation of the Espionage Act and the Leader’s second-class mailing privilege was revoked. As a result, mailing costs increased by a factor of seven, and circulation dropped by more than a third. Berger’s personal papers from this episode in administrative censorship only recently have become available to researchers. They reveal a principled and defiant publisher who argued he could be a critic and a patriot, and a local press contemptuous of Berger and fearful of the federal government, local censors, advertisers, and readers.

  4. American views of Sir Victor Horsley in the era of Cushing.

    Science.gov (United States)

    Lehner, Kurt R; Schulder, Michael

    2018-03-09

    Sir Victor Horsley was a pioneering British neurosurgeon known for his numerous neurosurgical, scientific, and sociopolitical contributions. Although word of these surgical and scientific achievements quickly spread throughout Europe and North America in the late 19th century, much of modern neurosurgery's view of Horsley has been colored by a single anecdote from John Fulton's biography of Harvey Cushing. In this account, Cushing observes a frenetic Horsley hastily removing a Gasserian ganglion from a patient in the kitchen of a British mansion. Not long after, Cushing left Britain saying that he had little to learn from British neurosurgery. The authors of this paper examined contemporary views of Horsley to assess what his actual reputation was in the US and Canada. The authors conducted a thorough search of references to Horsley using the following sources: American surgical and neurosurgical textbooks; major biographies; diary entries and letters; PubMed; newspaper articles; and surgical and neurosurgical texts. The positive reception of his work is corroborated by invitations for Horsley to speak in America. Research additionally revealed that Horsley had numerous personal and professional relationships with prominent Americans in medicine, including William Osler, John Wheelock Elliot, Ernest Sachs, and (yes) Harvey Cushing. Horsley's contributions to medicine and science were heavily reported in American newspapers; outside of neurosurgery, his strong opposition to the antivivisectionists and his support for alcohol prohibition were widely reported in popular media. Horsley's contributions to neurosurgery in America are undeniable. Writings from and about prominent Americans reveal that he was viewed favorably by those who had met him. Frequent publication of his views in the American media suggests that medical professionals and the public in the US valued his contributions on scientific as well as social issues. Horsley died too young, but not without the

  5. ARC Research Areas and Projects

    Science.gov (United States)

    studying realistic engine-in-vehicle operation, thermal management, component matching, advanced powertrain maximize the vehicle's performance. The vision of Thrust Area 1 is to create adaptive vehicles for maximum , victor.j.paul2.civ@mail.mil The safety and performance of human occupants and operators are paramount in the

  6. Victor and Erika Webnovela: An Innovative Generation @ Audience Engagement Strategy for Prevention.

    Science.gov (United States)

    Andrade, Elizabeth L; Evans, W Douglas; Edberg, Marc C; Cleary, Sean D; Villalba, Ricardo; Batista, Idalina Cubilla

    2015-01-01

    Entertainment-education (E-E) approaches for young audiences continue to evolve in order to keep stride with younger generations' affinity for technology. E-E and novelas have been used with a wide variety of audiences in the United States, in particular hard-to-reach Latino populations, and have demonstrated effectiveness in disseminating culturally relevant prevention information for a wide variety of health-related risk factors and behaviors. This study discusses the formative research and active engagement of Latino youth living in Langley Park, Maryland, for the development and filming of an innovative 6-episode webnovela titled Victor and Erika (V&E). V&E is part of a larger branding strategy of the Adelante Positive Youth Development intervention that seeks to prevent substance abuse, sexual risk, and interpersonal violence among Latino youth; V&E is also an intervention component. The V&E webnovela is a dramatic portrayal of the lives of 2 immigrant Latino teenagers that also disseminates risk prevention messages. The storyline represents the turning the corner (to a better life) theme that underlies the Adelante intervention brand. Formative research was conducted for character development (n = 20) and creative development of the episodes (n = 14). Results of the formative research showed that youth recommended inclusion of the following topics in V&E episodes: sex, unintended pregnancy, fidelity, trust, family dynamics, immigration status, violence, school dropout, respect, home life, and poverty. Detailed character and episode descriptions are provided, and the implications of using the V&E series as a tool for in-person and online engagement of youth and the dissemination of prevention messages are also discussed.

  7. Victor Brauner. Atrapulsion, peinture à la caséine sur toile présentant un important réseau de craquelures en cuvette

    OpenAIRE

    Pingeot, Cristina Cojocaru

    2014-01-01

    Atrapulsion est une peinture à la caséine sur toile de Victor Brauner (datée de 1938). L’altération majeure est constituée par la présence d’un réseau de craquelures généralisé, avec écailles en cuvette et en soulèvement. L’artiste a utilisé pour cette peinture des matières inadaptées à la peinture sur toile. L’œuvre a reçu un traitement de refixage avec une résine synthétique qui a laissé des résidus brillants en surface. L’élaboration du diagnostic a nécessité la réalisation d’essais de mod...

  8. A composição e interpretação de Victor Assis Brasil em Pro Zeca: hibridismo entre o baião e o bebop The composition and interpretation by Victor Assis Brasil in Pro Zeca: hybridism between the Brazilian baião and bebop

    Directory of Open Access Journals (Sweden)

    Leonardo Barreto Linhares

    2011-06-01

    Full Text Available Estudo sobre o reconhecimento de elementos composicionais e interpretativos característicos do baião e do bebop na Introdução e Tema da música Pro Zeca de Victor Assis Brasil (1945-1981, a partir de três fontes primárias: (1 a lead sheet editada que reproduz o manuscrito autógrafo do compositor (ASSIS BRASIL, sem data a, (2 uma lead sheet manuscrita de caligrafia anônima (ASSIS BRASIL, sem data b e (3 a lead sheet editada da transcrição a partir da gravação do compositor (ASSIS BRASIL, 1974, incluindo sua improvisação, que está publicada às p.39-44 nesse volume de Per Musi. Fundamentada por referenciais históricos e teóricos das práticas de performance da música brasileira (GIF-FONI, 1997; SIQUEIRA, 1981; SÉVE, 1999 e do jazz (GRIDLEY, 2006; LAWN, 1995; HOBSBAWM, 1990, BAKER, 1987, esta análise comparativa revela um hibridismo entre elementos do bebop e do baião, no qual as características desses dois gêneros populares de países diferentes às vezes permanecem distintas e às vezes se entrelaçam em uma síntese.Study about the recognition of compositional and intrepretive elements typical of bebop and baião in the Introduction and Theme of Pro Zeca by Brazilian composer and saxophonist Victor Assis Brasil (1945-1981 departing from three primary sources: (1 the edited lead sheet that reproduces the composer's autograph (ASSIS BRASIL, sem data a, (2 an anonymous lead sheet manuscript (ASSIS BRASIL, sem data b and (3 the lead sheet of the transcription based on the composer's recording (ASSIS BRASIL, 1974 included at the end of this article. Resorting to historical and theoretical references of performance practices in jazz (GRIDLEY, 2006; LAWN, 1995; HOBSBAWM, 1990, BAKER, 1987 and Brazilian music (GIFFONI, 1997; SIQUEIRA, 1981; SÉVE, 1999, this comparative analysis reveals hybridization between bebop and the Brazilian baião, in which the characteristics of these popular genres from two different countries sometimes

  9. Viewpoint. The decision to build the ISR and its consequences: the role of Victor Weisskopf

    International Nuclear Information System (INIS)

    Hine, Mervyn

    1995-01-01

    December 1995 marks the thirtieth anniversary of the decision by the CERN Council to approve the proposal by the then Director General Victor Weisskopf to build the Intersecting Storage Rings (ISR). It was probably the Council's most important decision since setting up the Laboratory, judging by its consequences for physics and for CERN over the following three decades. December is also the twenty-fifth anniversary of the startup of the machine which led to a period of developments in accelerator technology with far reaching consequences. They included the production of stable high current stacked beams with high interaction rates in the presence of non-linear resonances and space charge, the inventions of stochastic cooling and of beam instrumentation using Schottky scans, and the technology of large ultra-high vacuum chambers with controlled wall impedance and resonances, to name only a few. Two results from the ISR physics programme of similar importance for the future were the first observation of large particle and photon yields with high transverse momentum (indicative of quark-gluon processes deep inside the colliding protons), and the consequent development of concepts for detectors with full solid angle calorimetry and tracking coverage, now used on all colliders. The technical success of the machine and the significance of the physics results led to a radical switch in physicists' thinking everywhere, away from fixed targets and towards colliders as the way to higher collision energies for hadrons. The ISR ceased to be seen as a toy for accelerator builders and became a window into a future far beyond the possibilities of fixed target accelerators. The ISR advances in accelerator and detector technology stimulated the conversion of the SPS to a proton-antiproton collider and the similar conversion of the Fermilab machine, and led to the proposals for the Superconducting Supercollider (SSC) in the USA and the LHC in Europe, to plans for a

  10. Closed-Loop Optimal Control Implementations for Space Applications

    Science.gov (United States)

    2016-12-01

    with standard linear algebra techniques if is converted to a diagonal square matrix by multiplying by the identity matrix, I , as was done in (1.134...OPTIMAL CONTROL IMPLEMENTATIONS FOR SPACE APPLICATIONS by Colin S. Monk December 2016 Thesis Advisor: Mark Karpenko Second Reader: I. M...COVERED Master’s thesis, Jan-Dec 2016 4. TITLE AND SUBTITLE CLOSED-LOOP OPTIMAL CONTROL IMPLEMENTATIONS FOR SPACE APPLICATIONS 5. FUNDING NUMBERS

  11. A Randomized Phase 2 Trial of 177Lu Radiolabeled Anti-PSMA Monoclonal Antibody J591 in Patients with High-Risk Castrate, Biochemically Relapsed Prostate Cancer

    Science.gov (United States)

    2014-09-01

    Irene Karpenko Lauren Tyrell Olivera Calukovic Gillian Hodes June Greenberg Jessica Campbell PATIENTS AND THEIR FAMILIES Biostatistics...myelosuppression or need for >2 platelet (plt) transfusions, febrile neutropenia , or grade >2 non-heme toxicity following 177Lu- J591. PSA was assessed prior to...toxicity • Grade 4 neutropenia or thrombocytopenia > 14 days • Need for > 2 platelet transfusions or hemorrhage • Febrile neutropenia • > 3 week delay for

  12. Haïti : les pouvoirs de l'art dans Le Sang et la Mer de Gary Victor et La Belle Amour humaine de Lyonel Trouillot

    Directory of Open Access Journals (Sweden)

    Odile Gannier

    2012-11-01

    Full Text Available Dans cet article, l'auteure pose une question en écho aux événements de janvier 2010 : "comment écrire encore après les catastrophes ?". Elle en prend pour témoins les œuvres de Gary Victor et de Lyonel Trouillot (respectivement parues en 2010 et 2011 qui, pour l'une, raconte l'histoire d'une orpheline, Hérodiane, au parcours difficile, et rapporte, pour l'autre, l'enquête d'Anaïse, une étrangère, sur les traces de sa famille haïtienne. Odile Gannier analyse la construction de l'intrigue et des personnages, mais aussi les tonalités et les genres représentés dans les deux œuvres, ainsi que leurs multiples similitudes avec d'autres formes de production artistique (la peinture en particulier.

  13. Geometric Methods in the Algebraic Theory of Quadratic Forms : Summer School

    CERN Document Server

    2004-01-01

    The geometric approach to the algebraic theory of quadratic forms is the study of projective quadrics over arbitrary fields. Function fields of quadrics have been central to the proofs of fundamental results since the renewal of the theory by Pfister in the 1960's. Recently, more refined geometric tools have been brought to bear on this topic, such as Chow groups and motives, and have produced remarkable advances on a number of outstanding problems. Several aspects of these new methods are addressed in this volume, which includes - an introduction to motives of quadrics by Alexander Vishik, with various applications, notably to the splitting patterns of quadratic forms under base field extensions; - papers by Oleg Izhboldin and Nikita Karpenko on Chow groups of quadrics and their stable birational equivalence, with application to the construction of fields which carry anisotropic quadratic forms of dimension 9, but none of higher dimension; - a contribution in French by Bruno Kahn which lays out a general fra...

  14. Virginia Tech team qualifies as DARPA Urban Challenge semi-finalist

    OpenAIRE

    Crumbley, Liz

    2007-01-01

    "VictorTango," a team of Virginia Tech engineering and geography students, will travel to Victorville, Calif., for the national qualifying rounds of the Urban Challenge autonomous vehicle competition, sponsored by the Defense Advanced Research Projects Agency (DARPA).

  15. 76 FR 5244 - Alternative Transportation in Parks and Public Lands Program

    Science.gov (United States)

    2011-01-28

    ... to that unit. National Park Service: Mark H Hartsoe, Mark_H[email protected] ; tel: 202-513-7025, fax.... Montoya, Victor_Montoya@blm.gov , tel: 202-912-7041, mail: 1620 L Street, WO-854, Washington, DC 20036 For... of the project or projects. Under the authority provided in 49 U.S.C. 5320(h), FTA is extending pre...

  16. Cultural Resources Inventory of the Montz Freshwater Diversion Project Corridor, St. Charles Parish, Louisiana. Volume 1.

    Science.gov (United States)

    1986-06-23

    o’uisiana. Genealogical Publishing Company, Inc., Baltimore. Din, Gilbert C. (editor) 1917 Louisiana in 1776: A Memoria of Francisco Bouliiney...of Engineers. Shelford, Victor E. 1963 The Ecology of North America. University o- T-IlinoTis Press, Urbana . Sitterson, J. Carlyle 1953 Sugar

  17. Nuclear physicist, arms control advocate

    CERN Multimedia

    Chang, K

    2002-01-01

    Victor F. Weisskopf, a nuclear physicist who worked on the Manhattan Project to build the first atomic bomb in World War II and later became an ardent advocate of arms control, died Monday at his home in Newton, MA, USA. He was 93 (1 page).

  18. Marcel Duchamp, Constantin Brancusi, Victor Brauner : leurs rencontres et les retombées sur leurs œuvres

    Directory of Open Access Journals (Sweden)

    Cristian-Robert Velescu

    2013-12-01

    Full Text Available Duchamp avait rencontré Brancusi en 1912, année qui marque le début d’une amitié consignée par l’histoire de l’art. Son parcours avait été fixé dans les pages de leur correspondance, conservées au Centre Georges Pompidou. Le lecteur est surpris de constater qu’il n’y a que des faits anodins qui soient consignés, tandis que les références aux conceptions artistiques sont presque totalement absentes. Toutefois, en lisant les témoignages de Duchamp conservés dans les célèbres Boîtes (verte et blanche, on se rend compte qu’il partage les conceptions platoniciennes de son ami sculpteur, chose importante, qui nous laisse formuler des suppositions concernant une influence dirigée de Brancusi dans la direction Duchamp. À son tour, durant l’intervalle 1925–1928, Victor Brauner était l’hôte de Brancusi dans l’atelier de l’impasse Ronsin. C’est ici qu’il a pu rencontrer Duchamp, qui s’y rendait fréquemment dans les années 20. Une rencontre qui a certainement eu des retombées sur l’oeuvre du futur peintre surréaliste. La preuve en est dans deux de ses toiles, Tête et deux boxeurs et Passivité courtoise. Faut-il s’étonner que le message que Duchamp avait mis dans les structures sémantiques de son chef-d’oeuvre La Mariée mise à nu par ses célibataires, même ou Le Grand Verre y avait été « logé » d’une manière évidente ? Mais alors on doit reconnaître que lors de leurs rencontres de chez Brancusi, Duchamp avait transmis à Brauner des informations très précises sur l’iconographie du Grand Verre, ainsi que sur la quatrième dimension, que le futur peintre surréaliste allait reconvertir dans les trois dimensions de l’espace ordinaire. Perçu dans cette perspective, l’atelier de l’impasse Ronsin nous semble un lieu où les idées des trois artistes ont pu communiquer d’une manière osmotique.

  19. Diamond ages from Victor (Superior Craton): Intra-mantle cycling of volatiles (C, N, S) during supercontinent reorganisation

    Science.gov (United States)

    Aulbach, S.; Creaser, Robert A.; Stachel, Thomas; Heaman, Larry M.; Chinn, Ingrid L.; Kong, Julie

    2018-05-01

    The central Superior Craton hosts both the diamondiferous 1.1 Ga Kyle Lake and Jurassic Attawapiskat kimberlites. A major thermal event related to the Midcontinent Rift at ca. 1.1 Ga induced an elevated geothermal gradient that largely destroyed an older generation of diamonds, raising the question of when, and how, the diamond inventory beneath Attawapiskat was formed. We determined Re-Os isotope systematics of sulphides included in diamonds from Victor by isotope dilution negative thermal ionisation mass spectrometry in order to obtain insights into the age and nature of the diamond source in the context of regional tectonothermal evolution. Regression of the peridotitic inclusion data (n = 14 of 16) yields a 718 ± 49 Ma age, with an initial 187Os/188Os ratio of 0.1177 ± 0.0016, i.e. depleted at the time of formation (γOs -3.7 ± 1.3). Consequently, Re depletion model ages calculated for these samples are systematically overestimated. Given that reported 187Os/188Os in olivine from Attawapiskat xenoliths varies strongly (0.1012-0.1821), the low and nearly identical initial Os of sulphide inclusions combined with their high 187Re/188Os (median 0.34) suggest metasomatic formation from a mixed source. This was likely facilitated by percolation of amounts of melt sufficient to homogenise Os, (re)crystallise sulphide and (co)precipitate diamond; that is, the sulphide inclusions and their diamond host are synchronous if not syngenetic. The ∼720 Ma age corresponds to rifting beyond the northern craton margin during Rodinia break-up. This suggests mobilisation of volatiles (C, N, S) and Os due to attendant mantle stretching and metasomatism by initially oxidising and S-undersaturated melts, which ultimately produced lherzolitic diamonds with high N contents compared to older Kyle Lake diamonds. Thus, some rift-influenced settings are prospective with respect to diamond formation. They are also important sites of hidden, intra-lithospheric volatile redistribution

  20. Victor Olufolahan.Lasebikan

    African Journals Online (AJOL)

    ABStrAct. Factors associated with driving under the influence of cannabis (DUIC) and related road crashes ... the associations between risk factors and DUIC and car crashes respectively. Young .... abuse 44.5%, self reported DUIC 38.4% and.

  1. victor e. dike

    African Journals Online (AJOL)

    NESG PUBLICATIONS

    FAILED VISIONS AND ECONOMIC TRANSFORMATION: CAN NIGERIA ... improve the living conditions of the people. The major ..... supports high economic performance. In conclusion, for the economy to move beyond its present stage.

  2. Avaliação do acervo de periódicos da Biblioteca Ministro Victor Nunes Leal, do Supremo Tribunal Federal: relato de experiência da atuação do Grupo de Trabalho “GT-Periódicos”

    Directory of Open Access Journals (Sweden)

    Fabiana Oliveira Feitosa

    2016-12-01

    Full Text Available Relata a experiência da atuação de grupo de trabalho na avaliação da coleção de periódicos da Biblioteca Ministro Victor Nunes Leal do Supremo Tribunal Federal. Apresenta o histórico de crescimento do acervo e como surgiu a necessidade de avaliar a coleção de periódicos levando-se em conta custos, espaço físico e conservação, dentre outros tópicos. Ressalta a adoção de Política de desenvolvimento de coleções para nortear as decisões do Grupo. Conclui sobre a importância do trabalho em equipe, com destaque também para a necessidade de a avaliação de coleções ser um processo contínuo e programado.

  3. The Orthodox Doctrine of Salvation» by Archimandrite Sergius (Stragorodsky and its criticism by Confessor of the Faith Victor (Ostrovidov and Archbishop Seraphim (Sobolev

    Directory of Open Access Journals (Sweden)

    P. KHONDSINSKIY

    2014-04-01

    Full Text Available «The Orthodox Doctrine of Salvation», a well-known work by Archimandrite Sergius (Stragorodsky that was defended by him as a master’s thesis at the Moscow Theological Academy in 1895, is still considered an etalon in Orthodox theology. Meanwhile, in the first half of the 20th century, it was heavily criticized by at least two prominent members of the Church hierarchy of that time: Confessor of the Faith Victor (Ostrovidov and Archbishop Seraphim (Sobolev. This article does not only examine their arguments, but also provides the researcher’s personal understanding of the main theses of the work by Archimandrite Sergius. The researcher’s work in this case is complicated by a large number of patristic texts, which are given by Archimandrite Sergius and the abundance of which hampers the identification of his own original ideas. Nevertheless, the carried out analysis reveals that the dissertation doesn’t contain not only patristic, but any kind of a clear doctrine of the Fall, or of man’s state after the Fall, or of redemption, or of man’s assimilation of redemption fruits. Besides, the theses illustrated in the dissertation by the texts of the Holy Fathers belong not so much to them as to the first Slavophiles, Archimandrite Anthony (Khrapovitsky, the teacher and the senior friend of Archimandrite Sergius, and finally to Immanuel Kant. Consequently, in his doctrine of freedom anticipating grace, Archimandrite Sergius comes dangerously close to Pelagianism. These findings recognize the truth of complaints against the work of Archimandrite Sergius by Confessor of the Faith Viktor (Ostrovidov and Archbishop Seraphim (Sobolev.

  4. Reviews Book: Nucleus Book: The Wonderful World of Relativity Book: Head Shot Book: Cosmos Close-Up Places to Visit: Physics DemoLab Book: Quarks, Leptons and the Big Bang EBook: Shooting Stars Equipment: Victor 70C USB Digital Multimeter Web Watch

    Science.gov (United States)

    2012-09-01

    WE RECOMMEND Nucleus: A Trip into the Heart of Matter A coffee-table book for everyone to dip into and learn from The Wonderful World of Relativity A charming, stand-out introduction to relativity The Physics DemoLab, National University of Singapore A treasure trove of physics for hands-on science experiences Quarks, Leptons and the Big Bang Perfect to polish up on particle physics for older students Victor 70C USB Digital Multimeter Equipment impresses for usability and value WORTH A LOOK Cosmos Close-Up Weighty tour of the galaxy that would make a good display Shooting Stars Encourage students to try astrophotography with this ebook HANDLE WITH CARE Head Shot: The Science Behind the JKF Assassination Exploration of the science behind the crime fails to impress WEB WATCH App-lied science for education: a selection of free Android apps are reviewed and iPhone app options are listed

  5. Professor V. Weisskopf, CERN Director General (1961-1965)

    CERN Document Server

    1962-01-01

    Well known theoretical physicist Victor Weisskopf has died aged 93. Born in Austria, he later worked with Schrodinger in Berlin before emigrating to the US in 1937, where he joined the Manhattan project in 1944, and was witness to the Trinity Test in July 1945. In 1946 he became professor of physics at MIT. He took leave of absence to be Director General of CERN, the European Organization for Nuclear Physics, from 1961-1965.

  6. JPRS Report, Soviet Union, International Affairs

    Science.gov (United States)

    1988-01-08

    Stroessner Dictatorship," LATINSKAYA AMER- IKA, No 10, 1986. 2. "Notas sobre la economia y el desarollo en America Latina" [Records on the Economy...AMERICA Contents of LATINSKAYA AMERIKA, No 9 [LATINSKAYA AMERIKA No 9, Sep 87] 15 Editorial Praises LA Economic Integration Projects [LATINSKAYA...Movie Screen" (Interview with °936 Manuel Herrera) 65 Victor Vidal (Chile), "Allende Portrayed in Bronze" . 69 j^j0™1 PndseS LA

  7. Journal of Biosciences | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Journal of Biosciences. Victor Smetacek. Articles written in Journal of Biosciences. Volume 37 Issue 4 September 2012 pp 589-607 Perspectives. Making sense of ocean biota: How evolution and biodiversity of land organisms differ from that of the plankton · Victor Smetacek · More Details Abstract Fulltext ...

  8. 77 FR 5617 - Alternative Transportation in Parks and Public Lands Program

    Science.gov (United States)

    2012-02-03

    ...: Mark H Hartsoe, Mark_H[email protected] ; tel: (202) 513-7025, fax: (202) 371-6675, mail: 1849 C Street... Independence Avenue SW., Washington, DC 20250-1101. Bureau of Land Management: Victor F. Montoya, Victor_Montoya@blm.gov , tel: (202) 912-7041, mail: 1620 L Street, WO-854, Washington, DC 20036. For general...

  9. 78 FR 22026 - Alternative Transportation in Parks and Public Lands Program

    Science.gov (United States)

    2013-04-12

    .... National Park Service: Mark H Hartsoe, Mark_H[email protected] ; tel: 202-513-7025, fax: 202-371-6675, mail... Independence Avenue SW., Washington, DC 20250-1101. Bureau of Land Management: Victor F. Montoya, Victor_Montoya@blm.gov , tel: 202-912-7041, mail: 1620 L Street, WO-854, Washington, DC 20036. For general...

  10. Fulltext PDF

    Indian Academy of Sciences (India)

    1883-06-24

    Victor Franz Hess was born on June 24, 1883, at Waldstein Castle near Deutsch Feistritz,. Austria, to Vinzens and Sarafine Hess. His father was the chief forester in the estate of Prince. Oettingen-Wallerstein. Victor attended the Gymnasium in the nearby city of Graz and entered the University of Graz in 1901. He received ...

  11. 75 FR 25913 - Alternative Transportation in Parks and Public Lands Program

    Science.gov (United States)

    2010-05-10

    ... headquarters office to coordinate the availability of funds to that unit. National Park Service: Mark H Hartsoe, Mark_H[email protected] ; tel: 202-513-7025, fax: 202-371-6675, mail: 1849 C Street, NW., (MS2420....; Washington, DC 20250-1101. Bureau of Land Management: Victor F. Montoya, Victor_Montoya@blm.gov , tel: 202...

  12. U.S. Army Toxic Metal Reduction Program: Demonstrating Alternatives to Hexavalent Chromium and Cadmium in Surface Finishing

    Science.gov (United States)

    2014-11-18

    only) Medium Cal: M242 25mm Bushmaster, M230 30mm, GAU-12 25mm, 30mm Bushmaster II, EAPS 50mm POC: Vic Champagne , ARL, victor.k.champagne.civ...Shielding for Electronic Shelters) POC: Vic Champagne , ARL, victor.k.champagne.civ@mail.mil Cold Spray – Portable System and Internal Diameter

  13. Genomes to Life Project Quartely Report October 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Heffelfinger, Grant S.; Martino, Anthony; Rintoul, Mark Daniel; Geist, Al; Gorin, Andrey; Xu, Ying; Palenik, Brian

    2005-02-01

    .genomes-to-life.org Acknowledgment We want to gratefully acknowledge the contributions of the GTL Project Team as follows: Grant S. Heffelfinger1*, Anthony Martino2, Andrey Gorin3, Ying Xu10,3, Mark D. Rintoul1, Al Geist3, Matthew Ennis1, Hashimi Al-Hashimi8, Nikita Arnold3, Andrei Borziak3, Bianca Brahamsha6, Andrea Belgrano12, Praveen Chandramohan3, Xin Chen9, Pan Chongle3, Paul Crozier1, PguongAn Dam10, George S. Davidson1, Robert Day3, Jean Loup Faulon2, Damian Gessler12, Arlene Gonzalez2, David Haaland1, William Hart1, Victor Havin3, Tao Jiang9, Howland Jones1, David Jung3, Ramya Krishnamurthy3, Yooli Light2, Shawn Martin1, Rajesh Munavalli3, Vijaya Natarajan3, Victor Olman10, Frank Olken4, Brian Palenik6, Byung Park3, Steven Plimpton1, Diana Roe2, Nagiza Samatova3, Arie Shoshani4, Michael Sinclair1, Alex Slepoy1, Shawn Stevens8, Chris Stork1, Charlie Strauss5, Zhengchang Su10, Edward Thomas1, Jerilyn A. Timlin1, Xiufeng Wan11, HongWei Wu10, Dong Xu11, Gong-Xin Yu3, Grover Yip8, Zhaoduo Zhang2, Erik Zuiderweg8 *Author to whom correspondence should be addressed (gsheffe%40sandia.gov) 1. Sandia National Laboratories, Albuquerque, NM 2. Sandia National Laboratories, Livermore, CA 3. Oak Ridge National Laboratory, Oak Ridge, TN 4. Lawrence Berkeley National Laboratory, Berkeley, CA 5. Los Alamos National Laboratory, Los Alamos, NM 6. University of California, San Diego 7. University of Illinois, Urbana/Champaign 8. University of Michigan, Ann Arbor 9. University of California, Riverside 10. University of Georgia, Athens 11. University of Missouri, Columbia 12. National Center for Genome Resources, Santa Fe, NM Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  14. 2198-IJBCS-Article -Victor barku

    African Journals Online (AJOL)

    hp

    leaves was mixed with 2 L of distilled water in a volumetric flask ... methanol and 5 ml of 2 M HCl; and then reacting the filtrate with ... with 2.0 ml glacial acetic acid containing 1.0 drop of 5% FeCl3 ..... Peptide, 29(12): 2292-. 2375. Bioportfolio.

  15. 2020-IJBCS-Article-Victor Kimpouri

    African Journals Online (AJOL)

    hp

    structure of the forest, the renewal and the operation of the forest ... floristic change of the woody formation, of ... with growth slow and more adapted to the ... taxonomic nomenclature used is in agreement with the ...... regional spatial scales.

  16. 1790-IJBCS-Article-Victor Okombe

    African Journals Online (AJOL)

    hp

    pénaliser les performances zootechniques des animaux et altérer ... en mesure de s'en procurer aisément (Githiori et al., 2002 ... permettre le contrôle des parasitoses animales. (Waller, 1997a ..... complémentaire en gestion des ressources ...

  17. Investigating Potential Effects of Dengue Virus Infection and Pre-exposure to DEET on Aedes aegypti Behaviors

    Science.gov (United States)

    2016-02-05

    Investigating Potential Effects of Dengue Virus Infection and Pre-exposure to DEET on Aedes aegypti Behaviors by Victor A...exposure to DEET on Aedes aegypti Behaviors" Name of Candidate: Victor Sugiharto Doctor of Philosophy Degree February 5, 2016 DISSERTATION AND...Infection and Pre-exposure to DEET on Aedes aegypti Behaviors" is appropriately acknowledged and. beyond brief excerpts , is with the permission of

  18. SERVARE VITAS- Political Consequences for Romanian National Government and Military of Hostage Deaths in a Romanian Special Operations Forces Hostage Rescue Operation

    Science.gov (United States)

    2006-09-01

    leader, Victor Polay Campos , imprisoning him in Canto Grande prison in Lima. However, in July 1990, Campos and forty-six other MRTA members managed...leadership of MRTA had been captured, including Victor Polay Campos and some of his most important lieutenants. In 1996, the Peruvian government...Fortunately, those altercations ended when the police set up the twelve loudspeakers, with the loud music and patriotic hymns that covered the noises

  19. Ethics and the Military Profession. Sports and the Military

    Science.gov (United States)

    1980-01-01

    virtues, it would strive for an additional objective you both have chosen to ignore: aesthetic achievement. VICTOR: Uh, oh. H.D. is going to Wax artistic on...HENRY-DAVID: Easy. Think of the events in gymnastics . They require strength, timing, coordination, and endurance; and acquiring the skills demands...aesthetically. What more can you ask of a sport? JUSTIN: But gymnastics is competitive. VICTOR: And it doesn’t really develop team skills. HENRY-DAVID: You’re

  20. 1693-IJBCS-Article-Houndji Bidossessi Victor

    African Journals Online (AJOL)

    hp

    Les feuilles sont triées, lavées et essuyées. Elles sont ensuite séchées à l'ombre dans une pièce bien aérée et naturellement ventilée. Après séchage, les feuilles sont broyées et tamisées. La poudre ainsi obtenue est immédiatement conditionnée dans différents emballages tels que des seaux plastiques opaques de 15 kg ...

  1. 1751-IJBCS-Article-Ayantade Ayansina Victor

    African Journals Online (AJOL)

    hp

    A general decrease in bacterial counts relative to ... Bacterial species isolated from untreated water samples (control) included-. Proteus sp ... level at which toxic response is likely to occur ... on the persistence of chlorinated hydrocarbon.

  2. Obituario: El doctor Victor Manuel Ferrans

    Directory of Open Access Journals (Sweden)

    Alfredo Jácome Roca

    2002-04-01

    Full Text Available

    A finales del año pasado falleció en los Estados Unidos el médico colombiano Víctor Ferrans, quien dedicó su vida entera a la investigación en biología molecular.

    “Vic” (como le decían sus contemporáneos norteamericanos nació en Barranquilla en la década de los 30. Con raíces catalanas, se graduó de bachiller en el tradicional Colegio Biffi de los Hermanos Cristianos; viajó a New Orleans, donde se graduó de médico en la Universidad de Tulane e hizo su internado en el Charity Hospital de la misma ciudad.

    En vez de proseguir con una tradicional residencia en campos clínicoquirúrgicos que le hubieran garantizado una vida sin aulagas, decidió sacar un doctorado en anatomía, en su misma Alma Mater.

    Los colombianos éramos particularmente apreciados en aquel sitio, merced a programas como el “Tulane-Colombia” (ahora Cideim en Cali, orientado hacia el estudio de las enfermedades tropicales, y a la presencia de decenas de profesionales becados para hacer postgrados allí (que en nuestro país adquirirían luego el remoquete de los “Tulane boys”.

    Numerosas personas saltan a mi memoria, entre las que se encuentran Eduardo Gaitán, Germán Beltrán, Eugenio González, Ramsés Hakim, Alfonso Villamil, Jorge León, su hermana María Amalia y los hermanos Alberto y Mario Bernal, Oscar Bolaños, Mario Hurtado y muchos otros, que pasamos por aquellos claustros y residimos en esa interesante ciudad. Yo lo hice entre 1965 y 1967, cuando compartí trabajo y amistad con mi paisano Ferrans.

    Casado con la también barranquillera Gloria Grocer, Víctor se ubicó en el grupo del Profesor George E. Burch, jefe de Medicina Interna y eminente cardiólogo e investigador.

    Sus primeros “papers” llevaron la co-autoría de Burch, entre los que recuerdo uno sobre la necesidad de tratar las cardiomiopatìas dilatadas que se observaban en situaciones como los embarazos, con reposo estricto y prolongado, hasta por seis meses. Como Burch exigía que todo médico vinculado al Departamento hiciera consulta externa y pasara revista (o “rounds”, así se dedicara a la investigación, allí los residentes y fellows veíamos a grandes científicos participando en jornadas de un corte eminentemente clínico, lo que a su vez enriquecía nuestro aprendizaje...

  3. 533-IJBCS-Article-Prof Victor Deffo

    African Journals Online (AJOL)

    Dr Gatsing

    Determination of the best forage production period for cattle farming in the. Adamawa Region ... many factors such as relatively high average monthly forage quality in the pastures with 5.89% crude protein ...... VII-INAPG, Paris, France, p. 69.

  4. Uma investigação do ser-aí do menino selvagem à luz do pensamento heideggeriano

    OpenAIRE

    Feijoo, Ana Maria Lopez Calvo de; Gill, Débora; Protasio, Myriam Moreira

    2012-01-01

    Este trabalho busca, na história de Victor de Aveyron, elementos para discutir o modo pelo qual a existência humana se constitui. Por não ter convivido em ambiente humano, Victor foi motivo de intensas discussões no meio científico, especialmente entre os empiristas e os racionalistas. Nesta pesquisa assumimos uma postura fenomenológica, trazendo a história do menino selvagem à discussão por meio da fenomenologia hermenêutica de Heidegger, apontando, assim, para o caráter de indeterminação, o...

  5. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  6. Telaah Kritis Expectancy Theory Victor Harold Vroom

    OpenAIRE

    Anatan, Lina

    2010-01-01

    Expectancy theory has emerge as the dominant process theory of motivation, originally developed by Vroom is a theory explaining the process individual use to make decision on a various behavioral alternatives. The motivational force for a behavior, action, or task is a function of three distinctive perceptions: expectancy, instrumentality, and valance. The theory contains of two models: for the precition of valance of an outcome, and the other for the prediction of force toward behavior. It p...

  7. Of texts and contexts: reflections upon the publication of The Jung-White Letters.

    Science.gov (United States)

    Stein, Murray

    2007-06-01

    In addition to his many other personae, Jung was a writer and an author, which means a creator, whose written works underlie and authorize a field of thought and clinical work, i.e., analytical psychology. Not widely recognized is that many of his authored texts were stimulated by important and intense personal relationships. Freud and Victor White loom large, the first standing behind major early analytical texts like Wandlungen und Symbole der Libido and Psychological Types, the second behind later texts on culture, religion, and Christian theology. The publication of The Jung-White Letters reveals the significance of his relationship with Victor White for the authoring of Answer to Job.

  8. “Mais feliz que Augusto, melhor que Trajano” (Eutrópio, Breviário, viii. 5. 3): a construção do ideal de Optimus Princeps em Tácito e Plinio, o jovem.

    OpenAIRE

    FREITAS, João Victor Lanna de

    2015-01-01

    Programa de Pós-Graduação em História. Departamento de História, Instituto de Ciências Humanas e Sociais, Universidade Federal de Ouro Preto. Lanna, João Victor. “Mais feliz que Augusto, melhor que Trajano” (Eutrópio, Breviário, VIII.5.3): a construção do ideal de Optimus Princeps em Tácito e Plínio, o Jovem. João Victor Lanna de Freitas. Dissertação (Mestrado) Universidade Federal de Ouro Preto. Instituto de Ciências Humanas e Sociais. Programa de Pós-Graduação em História. Mariana, 2015....

  9. The Puzzle of NATO-Ukraine Relations: The Importance of Images in Ukraine's Bid for NATO Membership

    National Research Council Canada - National Science Library

    Savchenko, Volodymyr

    2007-01-01

    .... Despite Ukraine's pluralistic reforms, considerable democratic advances, and President Victor Yushchenko's continuous assertion of the high priority given Euro-Atlantic integration in Ukrainian...

  10. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  11. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  12. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  13. Põhja-Euroopa vägevaim kokk / Katrin Kurss

    Index Scriptorium Estoniae

    Kurss, Katrin

    2007-01-01

    Rahvusvahelisest kokkade võistlusest "Global Chef Challenge" ning seal osalenud kokkadest: Tom Victor Gausdal Norrast ; Carina Brydling Rootsist ; Thorsten Schmidt Taanist ; Simon Hulstone Suurbritanniast

  14. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  15. The Great Orange Hope: Ukraine, NATO, and the Dilemma of European Integration After the Orange Revolution

    National Research Council Canada - National Science Library

    Cramer, Clarke

    2005-01-01

    ...." The extraordinary election of Victor Yushchenko became a powerful catalyst for Ukrainian integration efforts into Europe and amplified Ukraine's geopolitical plight between Europe and Eurasia...

  16. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  17. Geology and ground-water hydrology of the Mokelumne area, California

    Science.gov (United States)

    Piper, A.M.; Gale, H.S.; Thomas, H.E.; Robinson, T.W.

    1939-01-01

    resistant breccia or agglomerate, which are presumed to have originated as mud flows. Nonfragmental andesite is not known to occur in the Mokelumne area, although several possible vents occur farther east. In the eastern part of the area the Mehrten formation truncates in turn the Valley Springs and lone formations and the pre-Cretaceous rocks; in the western part the Mehrten formation (andesitic) interfingers with the underlying Valley Springs formation (rhyolitic). Its maximum measured thickness is 400 feet. Few of the irrigation wells are so deep that they can be said with assurance to reach the Mehrten formation. The Laguna formation (Pliocene? and possibly lower Pleistocene) comprises poorly sorted, nonandesitic fluviatile sedimentary that overlie the Mehrten formation. It is inferred to be essentially parallel to and tilted equally with the Mehrten formation and to be about 400 feet thick. The Arroyo Seco gravel (presumably middle Pleistocene) veneers the Arroyo Seco pediment. At its easternmost outcrops the formation is composed of pebbles, cobbles, and boulders in a matrix of brick-red sand and silt; farther west, down the slope of the pediment, it becomes pr9gressively finer. It is inferred that the Arroyo Seco gravel is a coarse fraction of the rock waste that was transported from the Sierra Nevada after the Sierran.block was tilted in Pleistocene time. It is inferred further that the correlative of the Arroyo Seco gravel in the California Trough is a wedge-shaped mass of sediments whose base is the tilted Laguna formation and whose top can be interpolated by projecting a hypothetical surface through the remnants of the pediment. The Victor formation comprises the fluviatile sand, silt, and gravel that built the Victor alluvial plain over the hypothetical equivalent of the Arroyo' Seco gravel along the axis of the California Trough and against the western front of the dissected pediment to the east. The formation is thought to be about 100 feet thick along the

  18. Peatland Microbial Communities and Decomposition Processes in the James Bay Lowlands, Canada

    Science.gov (United States)

    Preston, Michael D.; Smemo, Kurt A.; McLaughlin, James W.; Basiliko, Nathan

    2012-01-01

    Northern peatlands are a large repository of atmospheric carbon due to an imbalance between primary production by plants and microbial decomposition. The James Bay Lowlands (JBL) of northern Ontario are a large peatland-complex but remain relatively unstudied. Climate change models predict the region will experience warmer and drier conditions, potentially altering plant community composition, and shifting the region from a long-term carbon sink to a source. We collected a peat core from two geographically separated (ca. 200 km) ombrotrophic peatlands (Victor and Kinoje Bogs) and one minerotrophic peatland (Victor Fen) located near Victor Bog within the JBL. We characterized (i) archaeal, bacterial, and fungal community structure with terminal restriction fragment length polymorphism of ribosomal DNA, (ii) estimated microbial activity using community level physiological profiling and extracellular enzymes activities, and (iii) the aeration and temperature dependence of carbon mineralization at three depths (0–10, 50–60, and 100–110 cm) from each site. Similar dominant microbial taxa were observed at all three peatlands despite differences in nutrient content and substrate quality. In contrast, we observed differences in basal respiration, enzyme activity, and the magnitude of substrate utilization, which were all generally higher at Victor Fen and similar between the two bogs. However, there was no preferential mineralization of carbon substrates between the bogs and fens. Microbial community composition did not correlate with measures of microbial activity but pH was a strong predictor of activity across all sites and depths. Increased peat temperature and aeration stimulated CO2 production but this did not correlate with a change in enzyme activities. Potential microbial activity in the JBL appears to be influenced by the quality of the peat substrate and the presence of microbial inhibitors, which suggests the existing peat substrate will have a large

  19. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  20. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  1. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  2. Jumalaema kiriku kellamees tuli Tartu Toome varemetesse / Andres Laasik

    Index Scriptorium Estoniae

    Laasik, Andres, 1960-2016

    2007-01-01

    13. juulil esietendus Emajõe Suveteatris "Jumalaema kiriku kellamees". Victor Hugo romaani järgi tegi instseneeringu Urmas Lennuk, lavastaja Andres Dvinjaninov. Mängitakse Tartu Toomkiriku varemetes

  3. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  4. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  5. [Victor von Hacker (1852-1933)--recollections of the life and works of an important Billroth student].

    Science.gov (United States)

    Stanger, O

    2000-04-01

    The year of 1999 marks the 75th anniversary of Viktor von Hacker's retirement as chairman of the Department of Surgery at Karl-Franzens University School of Medicine in Graz. He was a favored pupil of Theodor Billroth (1829-1894). When he took his professorship at Graz in 1903, the present hospital, then as now one of the largest in Europe, was still in planning, and he immediately involved himself in all the subsequent developmental stages. Now we are again living through a stage of major reconstruction and expansion within the context of the "LKH 2000" project which also encompasses the surgical department and wards, most of which have generally remained unchanged since Hacker's time. During his 21 years as chairman of the department, Hacker made major contributions in the fields of gastro-intestinal surgery, esophageal surgery and especially esophagoscopy, as well as plastic surgery. Towards the end of his career, 70 years ago, Viktor von Hacker was named an honorary member of the German Society of Surgery. For these reasons, the man and his work should be recalled.

  6. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  7. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  8. Armastusest ja ebausust Tartu Toomkirikus / Katre Väli

    Index Scriptorium Estoniae

    Väli, Katre

    2007-01-01

    13. juulil esietendus Emajõe Suveteatris "Jumalaema kiriku kellamees". Victor Hugo romaani järgi tegi instseneeringu Urmas Lennuk, lavastaja Andres Dvinjaninov, kujundus Iir Hermeliinilt. Mängitakse Tartu Toomkiriku varemetes

  9. Suveteatri juubelikellad Toomel / Kadri Selge

    Index Scriptorium Estoniae

    Selge, Kadri

    2007-01-01

    13. juulil esietendus Emajõe Suveteatris "Jumalaema kiriku kellamees". Victor Hugo romaani järgi tegi instseneeringu Urmas Lennuk, lavastaja Andres Dvinjaninov, kujundus Iir Hermeliinilt. Mängitakse Tartu Toomkiriku varemetes

  10. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  11. Towards a research pole in photonics in Western Romania

    Science.gov (United States)

    Duma, Virgil-Florin; Negrutiu, Meda L.; Sinescu, Cosmin; Rominu, Mihai; Miutescu, Eftimie; Burlea, Amelia; Vlascici, Miomir; Gheorghiu, Nicolae; Cira, Octavian; Hutiu, Gheorghe; Mnerie, Corina; Demian, Dorin; Marcauteanu, Corina; Topala, Florin; Rolland, Jannick P.; Voiculescu, Ioana; Podoleanu, Adrian G.

    2014-07-01

    We present our efforts in establishing a Research Pole in Photonics in the future Arad-Timisoara metropolitan area projected to unite two major cities of Western Romania. Research objectives and related training activities of various institutions and groups that are involved are presented in their evolution during the last decade. The multi-disciplinary consortium consists principally of two universities, UAVA (Aurel Vlaicu University of Arad) and UMF (Victor Babes Medicine and Pharmacy University of Timisoara), but also of the Arad County Emergency University Hospital and several innovative SMEs, such as Bioclinica S.A. (the largest array of medical analysis labs in the region) and Inteliform S.R.L. (a competitive SME focused on mechatronics and mechanical engineering). A brief survey of the individual and joint projects of these institutions is presented, together with their teaching activities at graduate and undergraduate level. The research Pole collaborates in R&D, training and education in biomedical imaging with universities in USA and Europe. Collaborative activities, mainly on Optical Coherence Tomography (OCT) projects are presented in a multidisciplinary approach that includes optomechatronics, precision mechanics and optics, dentistry, medicine, and biology.

  12. General Stănculescu implications in the 1989 revolution – giving up power

    Directory of Open Access Journals (Sweden)

    Flavius-Cristian Mărcău

    2014-12-01

    Full Text Available Abstract General Victor Atanasie Stănculescu is one of the main pawns during the Revolution of 1989 and in the continuation of our scientific approach we demonstrate how he has held power during demonstrations and how he transferred to Ion Iliescu. We do not want to develop a hypothesis showing the heroic deeds of General but on the basis of documents, to highlight the important role that he had. General Victor Atanasie Stănculescu was one of the few who had knowledge disembarkation of Ceausescu and the only one who managed to take over the power from the hands of dictators - power which does not used it but he transferred it in the hands of Ion Iliescu.

  13. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  14. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  15. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  16. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  17. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  18. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  19. Search Results | Page 92 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2018-05-04

    . Books. -. Shadow Libraries: Access to Knowledge in Global Higher Education ... ICT innovation needs solid relationships ... Research Award Recipient Victor Oteku, “but the importance of personal connections is very strong ...

  20. The International Criminal Court: Why We Need It, How We Got It, Our Concern About It

    National Research Council Canada - National Science Library

    MacCuish, Donald A; Hater, David A; Dubriske, Steven D; Ruby, Tomislav

    2005-01-01

    ... extreme. The problem with judicial proceedings is that they can have a hint of victor's justice, especially if the jurisdiction, legitimacy, and authority of the court are not established in advance...

  1. The vices of emperor Constans I in the fourth century histories

    Directory of Open Access Journals (Sweden)

    Milivojević Uroš

    2008-01-01

    Full Text Available The aim of this paper is to analyze the negative characteristics of the Roman emperor Constans I (337-350, according to the earliest preserved information from the late 4th century histories of Aurelius Victor, Eutropius Pseudo-Victor and Eunapius of Sardis. The earliest account of Constans' downfall is around 361 recorded by Aurelius Victor in his short history De Caesaribus. Victor wrote that Constans became more arrogant and aggressive after he defeated his elder brother Constantine II in 340. Also, he was not cautious enough for his young age, was hated due to his bad subordinates and did not respect his soldiers properly. But, the most outrageous fact was according to Victor, that the emperor had homosexual affinity towards his young and attractive barbarian hostages. The record of less moralistic Eutropius in his Breviarium ab Urbe condita, written in 369, is shorter but sharper. In the beginning the reign of Constans was vigorous and righteous but his character deteriorated after his illness. Following that, the young Augustus befriended himself with corrupted companions and turned to severe vices. His reign grew unbearable to his subjects and unpopular among the army ranks. Briefer then Eutropis is the testimony of an anonymous Latin author of Epitome de caesaribus who was contemporary to the Eastern Roman emperor Arcadius (395-408. This Pseudo-Victor wrote down that Constans devoted himself to hunting session, thus allowing plotters to dethrone him. Finally the single Greek author in this series, Eunapius (died after 404, whose istoria h meta Dexippon survived in fragments and Zosimus' late fifth century abridgment, called Constans the worst among the most intolerable tyrants. The Lydian sophist, as far as we could conclude from Zosimus', also recorded Constans' inclination towards young barbarians whom he allowed to mistreat his subjects. Because of wretchedness in the provinces of his realm, the courtiers led coup d'etat through

  2. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  3. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  4. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  5. 77 FR 61051 - Additional Designations, Foreign Narcotics Kingpin Designation Act

    Science.gov (United States)

    2012-10-05

    ..., Distrito Federal Codigo Postal 03020, Mexico; Calle Sor Juana Ines de la Cruz No. 144, Departamento 124... (Mexico) (individual) [SDNTK]. 2. FELIX FELIX, Victor Manuel (a.k.a. CASTRO RODRIGUEZ, Raul), Callejon...

  6. Journal of Computer Science and Its Application - Vol 21, No 2 (2014)

    African Journals Online (AJOL)

    Intelligent workflow driven processing for electronic mail management · EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Ogwueleka Francisca Nonyelum, Victor Waziri, Maliki Danlami, 1-10 ...

  7. Carbon dioxide, temperature, salinity and other variables collected via time series monitoring from METEOR, POSEIDON and others in the North Atlantic Ocean from 1995-10-02 to 2009-11-25 (NODC Accession 0100064)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0100064 includes chemical, physical, time series and underway - surface data collected from METEOR, POSEIDON, TALIARTE and VICTOR HENSEN in the North...

  8. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  9. OBIAGWU, Obinna Victor Directorate of General Studies Federal ...

    African Journals Online (AJOL)

    DGS-FUTO

    2018-06-01

    Jun 1, 2018 ... practitioners. The relevant indigenous ethical and cultural values like ... to boast the morality standard of media practice in the contemporary times. ..... business of self revelation and to restructure an imbalance in the politics of.

  10. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  11. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  12. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  13. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  14. 78 FR 3077 - Qualification of Drivers; Exemption Applications; Epilepsy and Seizure Disorders

    Science.gov (United States)

    2013-01-15

    ... consciousness that resulted from a known medical condition (e.g., drug reaction, high temperature, acute... truck driving school and drive tractor trailer with his wife, as she is a long haul driver. Victor...

  15. 75 FR 4622 - Qualification of Drivers; Exemption Applications; Diabetes

    Science.gov (United States)

    2010-01-28

    .... Bauer, Michael P. Berger, William D. Blosch, Michael Bohlen, Bradley N. Brown, Victor M. Brunner, Tom L..., Eugene G. Friedman, Edward L. Gilbert, Donald W. Hansen, Joseph S. Hernandez, Corrine J. Hoffman, Robert...

  16. Search Results | Page 92 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2018-05-04

    May 4, 2018 ... Shadow Libraries: Access to Knowledge in Global Higher Education ... Research Award Recipient Victor Oteku, “but the importance of personal connections ... populations, including displaced women and children,” she says.

  17. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  18. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  19. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  20. Uma investigação do ser-aí do menino selvagem à luz do pensamento heideggeriano Una investigación del ser-ahí del niño salvaje a luz del pensamiento heideggeriano An investigation of the Dasein of the wild boy through Heidegger's thought

    Directory of Open Access Journals (Sweden)

    Ana Maria Lopez Calvo de Feijoo

    2012-08-01

    Full Text Available Este trabalho busca, na história de Victor de Aveyron, elementos para discutir o modo pelo qual a existência humana se constitui. Por não ter convivido em ambiente humano, Victor foi motivo de intensas discussões no meio científico, especialmente entre os empiristas e os racionalistas. Nesta pesquisa assumimos uma postura fenomenológica, trazendo a história do menino selvagem à discussão por meio da fenomenologia hermenêutica de Heidegger, apontando, assim, para o caráter de indeterminação, o "ter de ser", e de singularidade da existência, sempre em jogo na constituição do modo de ser do homem.Este trabajo busca en la historia de Víctor de Aveyron elementos para discutir el modo por el cual la existencia humana se constituye. Por no haber convivido en ambiente humano, Víctor ha sido motivo de intensas discusiones en el medio científico, especialmente entre los empiristas y los racionalistas. En esta investigación asumimos una postura fenomenológica, trayendo la historia do menino salvaje a discusión por medio de la fenomenología hermenéutica de Heidegger, apuntando, así, para el carácter de indeterminación, o "tener de ser", e de singularidad de la existencia, siempre en juego en la constitución del modo de ser del hombre.This work aims to find, in the story of Victor of Aveyron, elements to discuss the way in which human existence is constituted. For not having lived in the human environment, Victor was the subject of intense discussions within the scientific community, especially among empiricists and rationalists. In this research we take a phenomenological approach, bringing the story of the wild boy into the discussion through the Heidegger's phenomenology hermeneutic, pointing to the character of indeterminacy, mineness; and the singularity of the existence, always presented in the constitution of man's way of being.

  1. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  2. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  3. Creolising Political Identity and Social Scientific Method

    African Journals Online (AJOL)

    2014-06-16

    Jun 16, 2014 ... When accepting the 2013 Latin American and Caribbean Regional ..... of theory emerging from Native or Latin America, the Caribbean, and .... Turner, Victor, 1969, The Ritual Process: Structure and Anti-Structure, Hawthorne,.

  4. Teatritalv / Mihkel Mutt

    Index Scriptorium Estoniae

    Mutt, Mihkel, 1953-

    1999-01-01

    Caryl Churchilli näidend "Tipptüdrukud" (lavastaja Mati Unt) Eesti Draamateatris, Roger Vitraci näidend "Victor" (lavastaja Jaan Tooming) Vanalinnastuudios ja Jaanus Rohumaa instseneering "Noorem Edda ehk meresõitjad" Tallinna Linnateatris

  5. Retrospctive studies of small ruminant diseases diagnosed at the ...

    African Journals Online (AJOL)

    Retrospctive studies of small ruminant diseases diagnosed at the Veterinary Teaching Hospital, University of Agriculture, Makurdi, Nigeria. J.W. Jatfa, A.Y. Adenkola, I Victor, A Kisani, S.S. Adamu, P.A. Onyeyili ...

  6. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  7. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  8. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  9. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  10. Jean Valjean y Rastignac: dos modelos extremos de comprender la libertad en el héroe decimonónico / Jean Valjean and Rastignac: Two Opposing Approaches on the Notion of Freedom in the Nineteenth-Century Hero

    Directory of Open Access Journals (Sweden)

    Guillermo Aguirre Martínez

    2012-01-01

    Full Text Available Through two universal characters, Jean Valjean and Eugène de Rastignac, French decimononic narrative offers two heroic models as two different views of the world: one embodies Victor Hugo’s social ideas, and the other Honoré de Balzac’s ones. In this paper, we suggest a study focused on the heroe’s fight against destiny in order to develop several oppositions between chance and fate. This duality is the central idea in the work of both novelists. Finally, we will analyze the heroe’s work aiming to under-sand how the ethical behavior trascends fiction to emerge into the real world.À travers les personnages de Jean Valjean et de Eugène de Rastignac, le roman français du XIXème proposera deux modèles de héros appréhendés comme des cosmovisions opposées : l’une incarnera les idées sociales de Victor Hugo, et l’autre celles d’Honoré de Balzac. Dans cet article, nous proposons une approche qui s’empare de la figure du héros et sa confrontation avec le destin, afin d’établir une série d’oppositions autour de la dualité hasard-nécessité, entendue comme fondement clé dans l’œuvre des deux romanciers. Enfin, nous réaliserons une série de comparaisons éclairantes autour de la tâche du héros dans le but de comprendre comment les conduites éthiques manifestées dans la fiction trouvent leur projection dans la vie même.

  11. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  12. Journal of Humanities - Vol 18, No 1 (2004)

    African Journals Online (AJOL)

    Gorgias' scepticism regarding Greek social class distinctions in the Funeral Oration (DK.82.BSa) · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Victor S. Alumona, 1-11 ...

  13. 77 FR 74273 - Qualification of Drivers; Exemption Applications; Vision

    Science.gov (United States)

    2012-12-13

    ... (SD) Terry L. Anderson (PA) Sammy J. Barada (NE) Timothy Bradford (TN) Cody W. Cook (OK) Marvin R...) Thomas L. Oglesby (GA) Garrick Pitts (AR) Jonathan C. Rollings (IA) Preston S. Salisbury (MT) Victor M...

  14. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  15. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  16. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  17. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  18. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  19. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  20. The Prince and the Pancratiast: Persian-Thessalian Relations in the Late Fifth Century B.C.

    Directory of Open Access Journals (Sweden)

    John O. Hyland

    2015-05-01

    Full Text Available Darius II’s invitation to the Olympic victor Poulydamas and Cyrus’ friendship with Thessalian aristocrats were renewals of old ties between Persia and Thessaly and part of Persian intervention in the Peloponnesian War.

  1. ADSORPTIVE APPROACH ON NEPHOLOMETRIC STUDY OF ...

    African Journals Online (AJOL)

    Ifechukwu G. Ezemagu1, Matthew C. Menkiti1,2*, Victor I. Ugonabo1 and Mathew C. ... 3Department of Chemical Engineering, University of Hull, UK ...... Stuart, B.H. Infrared Spectroscopy: Fundamentals and Applications, John Wiley and.

  2. Hitler ja tema Eesti jüngrid / Pekka Erelt

    Index Scriptorium Estoniae

    Erelt, Pekka, 1965-

    2000-01-01

    Vt. ka Vesti : Nedelja Pljus Mar/3 lk. 16. Vabadussõjalased ehk natsid ei olnud ainsad Eesti paremäärmuslased. 1930. aastate algul asutas baltisakslane Victor von Zur Mühlen Eestis Balti natsionaal-sotsialistliku liikumise

  3. Why is relating plankton community structure to pelagic production ...

    African Journals Online (AJOL)

    spamer

    The conceptual framework for quantitative marine ecology is attributable to Victor Hensen (1887), who pro- ... As fish were being “harvested” by man, it was argued that relationships .... carry their own functional chloroplasts or else derive.

  4. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  5. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  6. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  7. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  8. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  9. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  10. Mathematical Modelling of Fluid Flow in Cone and Cavitation Formation

    Directory of Open Access Journals (Sweden)

    Milada KOZUBKOVÁ

    2011-06-01

    Full Text Available Problem of cavitation is the undesirable phenomena occuring in the fluid flow in many hydraulic application (pumps, turbines, valves, etc.. Therefore this is in the focus of interest using experimental and mathematical methods. Based on cavitation modelling in Laval nozzle results and experience [1], [2], [4], following problem described as the water flow at the outlet from turbine blade wheel was solved. Primarily the problem is simplified into modelling of water flow in cone. Profiles of axial, radial and tangential velocity are defined on inlet zone. The value of pressure is defined on the outlet. Boundary conditions were defined by main investigator of the grant project – Energy Institute, Victor Kaplan’s Department of Fluid Engineering, Faculty of Mechanical Engineering, Brno University of Technology. The value of air volume was insignificant. Cavitation was solved by Singhal model of cavitation.

  11. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  12. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  13. Achievements in emergency medical rescue service, North-West ...

    African Journals Online (AJOL)

    2006-08-28

    Aug 28, 2006 ... In North-West province this process of provincialisation took place in ... Emergency Medical Rescue Service, Department of Health, North-West. Victor R .... recovery after CPR treatment should be started as soon as possible ...

  14. 78 FR 10250 - Qualification of Drivers; Exemption Applications; Vision

    Science.gov (United States)

    2013-02-13

    ...) Glen T. Garrabrant (NJ) Richard A. Guthrie (MT) Glen T. Garrabrant (NJ) Richard A. Guthrie (MT) Alan L. Johnston (IL) Bryon K. Lavender (OH) Victor M. McCants (AL) James E. Menz (NY) Dennis I. Nelson (WI...

  15. Ühe imago anatoomia ehk pilk kinokriitika kööki / Ilmar Raag

    Index Scriptorium Estoniae

    Raag, Ilmar, 1968-

    1996-01-01

    Walt Disney kompanii esitles Pariisis täispikka muusikalist joonisfilmi 'Jumalaema kiriku kellamees' (Victor Hugo romaani 'Jumalaema kirik Pariisis' ainetel "The Hunchback of Notre Dame", režissöörid Gary Trousdale, Kirk Wise, USA 1996)

  16. Plaadid / Valner Valme

    Index Scriptorium Estoniae

    Valme, Valner, 1970-

    2003-01-01

    Uutest plaatidest Smashing Pumpkins "Earphoria", "Jazzland Remixed 2", Ekrem & Gypsy Groovz "Rivers Of Happiness", Trio Tesis "Los Pasos Perdidos", Willie Nelson & Friends "Stars & Guitars", Victor Davies "Remixes", Velikije Luki "Tallinn põleb!", Mario Frangoulis "Sometimes I Dream"

  17. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  18. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  19. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  20. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  1. [Super sweet corn hybrids adaptability for industrial processing. I freezing].

    Science.gov (United States)

    Alfonzo, Braunnier; Camacho, Candelario; Ortiz de Bertorelli, Ligia; De Venanzi, Frank

    2002-09-01

    With the purpose of evaluating adaptability to the freezing process of super sweet corn sh2 hybrids Krispy King, Victor and 324, 100 cobs of each type were frozen at -18 degrees C. After 120 days of storage, their chemical, microbiological and sensorial characteristics were compared with a sweet corn su. Industrial quality of the process of freezing and length and number of rows in cobs were also determined. Results revealed yields above 60% in frozen corns. Length and number of rows in cobs were acceptable. Most of the chemical characteristics of super sweet hybrids were not different from the sweet corn assayed at the 5% significance level. Moisture content and soluble solids of hybrid Victor, as well as total sugars of hybrid 324 were statistically different. All sh2 corns had higher pH values. During freezing, soluble solids concentration, sugars and acids decreased whereas pH increased. Frozen cobs exhibited acceptable microbiological rank, with low activities of mesophiles and total coliforms, absence of psychrophiles and fecal coliforms, and an appreciable amount of molds. In conclusion, sh2 hybrids adapted with no problems to the freezing process, they had lower contents of soluble solids and higher contents of total sugars, which almost doubled the amount of su corn; flavor, texture, sweetness and appearance of kernels were also better. Hybrid Victor was preferred by the evaluating panel and had an outstanding performance due to its yield and sensorial characteristics.

  2. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  3. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  4. Hudba a rituál

    Czech Academy of Sciences Publication Activity Database

    Tyllner, Lubomír

    2016-01-01

    Roč. 103, č. 4 (2016), s. 635-654 ISSN 0009-0794 Institutional support: RVO:68378076 Keywords : traditional music * ritual * ceremony * carnival * fasnacht * ethnomusicology * liminality * antistructure * communitas * Arnold van Gennep * Victor Turner Subject RIV: AC - Archeology, Anthropology, Ethnology

  5. Tele2 kutsus kliendid teatrisse ja kontsertidele

    Index Scriptorium Estoniae

    2007-01-01

    Suvel kutsus Tele 2 kliendid Victor Hugo loo "Jumalaema kiriku kellamees" muusikalisele vaatemängule Tartus (lavastajad Urmas Lennuk ja Andres Dvinjaninov), Muhu Tulevikumuusika festivalile "Juu Jääb" ja Tallinna Linnateatri suvelavastusele "Ronk" (lavastaja Elmo Nüganen)

  6. 78 FR 73886 - Notice of Determinations Regarding Eligibility To Apply for Worker Adjustment Assistance

    Science.gov (United States)

    2013-12-09

    ... Specification Alloys, Inc... Saginaw, MI......... September 25, 2012. 83,191 Victor Innovative Textiles, LLC... Polycom, Inc., PolyOne Cape Girardeau, MO.. Designed Structures & Solutions, Workforce Employment.... 83,214 Timken Company (The), Altavista Altavista, VA....... Bearing Plant. [[Page 73889

  7. From ‘War Culture’ to ‘Culture of Victory’: The Victors and the Construction of Franco’s Dictatorship (1936-1951 | De la cultura de guerra a la cultura de la victoria: los vencedores y la construcción de la dictadura franquista (1936-1951

    Directory of Open Access Journals (Sweden)

    Claudio Hernández Burgos

    2016-12-01

    Full Text Available This article explores the role of war experience in the construction of Franco’s dictatorship by analyzing the attitudes and behavior of the victors and the regime’s grassroots during the Spanish Civil War and the postwar period. It aims in particular at examining the way in which the war –both on the frontline and at the rearguard– affected many individuals who eventually became the strongest supporters of a culture based on military victory. With a view to that, and departing from a local perspective, it explores the different ways (rewards system, engagement in the regime institutions, collaboration in enemy repression, and establishment of an everlasting victors’ memory in which both dictatorship and social exclusion of the vanquished were firmly laid down. | El presente artículo examina el papel de la experiencia de guerra en la conformación de la dictadura franquista a través del análisis de las actitudes y comportamientos de los vencedores y apoyos sociales del régimen durante la propia Guerra Civil y la posguerra. En concreto, se trata de examinar el modo en que la contienda –ya fuera en el frente o en la retaguardia– influyó a un amplio conjunto de individuos que acabaron por convertirse en los mayores defensores de una cultura cimentada sobre la victoria armada. Para ello, partiendo desde una perspectiva centrada en el plano local, se exploran las diferentes vías (sistema de recompensas, participación en las instituciones del régimen, colaboración en la persecución del enemigo o perpetuación de la memoria de los vencedores a través de las cuales contribuyeron a la consolidación de la dictadura, al tiempo que propiciaron la exclusión social de los perdedores de la guerra.

  8. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  9. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  10. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  11. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  12. Transdermal opioid patches for pain treatment in ancient Greece

    DEFF Research Database (Denmark)

    Harrison, Adrian Paul; Hansen, Steen Honore'; Bartels, Else M.

    2012-01-01

    that OVDO can be useful for treating extreme pain and swellings, forming one of the best eye salves. Olympic Victor's Dark Ointment, an opium-based treatment, forms a "patch" when applied externally as an ointment, because it quickly dries to cover a localized region but still retains its elastic properties......Pain treatment in ancient Greece, and through the middle ages in Europe, was to a great extent based on the expertise of the Greek physician Galen (c. 129-200 A.D.). Galen makes particular reference to "Olympic Victor's Dark Ointment" (OVDO), which is listed with a number of collyria. Galen states...... abilities in terms of drug delivery, which could be transferred to modern medicine. Indeed, this may lead to a better choice of morphine use and controlled management in individual patient cases, taking both pain relief and anti-inflammatory aspects into account....

  13. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  14. Psycho-vegetative status of children suffering from giardiasis

    Directory of Open Access Journals (Sweden)

    I.B. Yershova

    2017-09-01

    Full Text Available Background. The study of psycho-vegetative disorders in children with Giardia lamblia infection was the objective of the study. Materials and methods. The study involved 86 children with giardiasis aged 7–18 years. To evaluate the autonomic changes, there were applied a questionnaire by A. Wayne. The autonomic tone was determined by the table of Guillaume-Veyn, vegetative reactivity — using Dagnini-Aschner reflex, vegetative supply of reactivity — by means of orthostatic test. Psychological examination of children was conducted using the methodology “Personality disorder diagnosis” by Z. Karpenko, Rosenberg Self-Esteem Scale, Beck Depression Inventory. Results. 75.6 % of сhildren had signs of autonomic dysfunction syndrome, 41.9 % — the parasympathetic autonomic tone, 43.0 % — the vagotonic type of autonomic reactivity. Inadequate maintenance of vegetative reactivity was detected in 39.5 % of patients. Psychological testing showed uncertainty in 55.9 % of child­ren, anxiety — in 42.6 %, decrease in self-esteem — in 41.2 %; depression — in 38.2 %, isolation — in 27.9 %. Conclusions. Vegetative disorders in children with giardiasis occur in 75.6 % of cases. There is a tendency to vagotonia. Changes of psycho-functional status are manifested by increasing isolation, depression, anxiety.

  15. CERN loses two former Directors-General

    CERN Multimedia

    2002-01-01

    Victor Weisskopf, a giant of modern physics and Director General of CERN from 1961-65, died on 21 April. The previous month, Willibald Jentschke, Director General from 1971-75 and founder of the DESY Laboratory in Hamburg, passed away.

  16. Satire and Utopian Vision in Hugo, Dickens, and Zamiatin.

    Science.gov (United States)

    Grossman, Kathryn M.

    1985-01-01

    Examines Victor Hugo's "Ninety-three," Charles Dickens'"Tale of Two Cities," and Eugene Zamiatin's "We" as examples of romantic satire, considering in each work the quest motif, the oedipal themes, the dystopian vision, and the role of love. (AYC)

  17. Uterjannõi mir, uterjannoje stshastje / Lauri Vahtre

    Index Scriptorium Estoniae

    Vahtre, Lauri, 1960-

    2006-01-01

    Maailma populaarsemaid mängufilme "Tuulest viidud" ("Gone with the Wind") Margaret Mitchelli romaani järgi : režissöörid Victor Fleming, George Cucor, Sam Wood : Ameerika Ühendriigid 1939. Algteose loomisest ja selle filmiks saamisest

  18. Kadunud maailm, kaotatud õnn / Lauri Vahtre

    Index Scriptorium Estoniae

    Vahtre, Lauri, 1960-

    2006-01-01

    Maailma populaarsemaid mängufilme "Tuulest viidud" ("Gone with the Wind") Margaret Mitchelli romaani järgi : režissöörid Victor Fleming, George Cucor, Sam Wood : Ameerika Ühendriigid 1939. Algteose loomisest ja selle filmiks saamisest

  19. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  20. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  1. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  2. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  3. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  4. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  5. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  6. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  7. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  8. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  9. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  10. John Cale avaldas memuaarid

    Index Scriptorium Estoniae

    1999-01-01

    Rockbändi "The Velvet Underground" asutajaliige John Cale avaldas oma autobiograafia "What's Welsh for Zen?". Koos biograafiakirjanik Victor Bockrisiga kirjutatud teos räägib 60ndate lõpu kultuurielust New Yorgis, koostööst Andy Warholiga jm.

  11. Roheline disain / Villem Loigom

    Index Scriptorium Estoniae

    Loigom, Villem

    2007-01-01

    Ökodisainist. Mõiste eco design (green design) kasutusele võtnud austria disaineri Victor Papaneki (1927-1999) soovitusi. Näiteks toodud Ikea toolid ja 1995. a. Jan Drangeri disainitud täispuhutavad Rolig-toolid, 1958. a. Kaj Francki loodud Kartio klaasid jm

  12. August välja küll, aga kunas ja kuidas? / Andres Arrak

    Index Scriptorium Estoniae

    Arrak, Andres, 1958-2017

    2009-01-01

    USA majandustsüklite uurija Victor Zarnowitz väidab, et järsule majanduslangusele järgneb kiire tõus. Autor leiab, et Eestit võimaldavad majanduskriisist välja tuua mitte ainult õiged otsused valitsussektoris, vaid ka erasektoris

  13. 75 FR 67731 - Change in Bank Control Notices; Acquisitions of Shares of a Bank or Bank Holding Company

    Science.gov (United States)

    2010-11-03

    ... November 16, 2010. A. Federal Reserve Bank of Chicago (Colette A. Fried, Assistant Vice President) 230 South LaSalle Street, Chicago, Illinois 60690-1414: 1. Robert John Dentel, Victor, Iowa, and Mary P...; 8:45 am] BILLING CODE 6210-01-P ...

  14. Winter flooding in Dutch stream valley floodplains: biogeochemical effects and vegetation consequences

    NARCIS (Netherlands)

    Beumer, V.

    2009-01-01

    Winter flooding in Dutch stream valley floodplains: biogeochemical effects and vegetation consequences Victor Beumer Climatic change has great impacts on stream catchments and their ecology. Expectations are that more extreme climate events will result in undesired flooding in stream catchments. In

  15. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  16. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  17. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  18. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  19. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  20. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  1. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  2. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  3. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  4. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  5. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  6. O teatro dos "bóias-frias": repensando a antropologia da performance

    Directory of Open Access Journals (Sweden)

    John C. Dawsey

    2005-12-01

    Full Text Available Os escritos de Victor Turner referentes à antropologia da performance são sugestivos para a análise do que poderíamos chamar de "teatro dos bóias-frias". Mas esse teatro de canaviais e carrocerias de caminhões também é sugestivo: trata-se de um lugar privilegiado para se repensar um conjunto de questões que emergem nas interfaces da performance e antropologia. Tendo-se em vista a especificidade da "prática de calcular o lugar olhado das coisas" que caracteriza esse teatro, os seguintes tópicos pontuam o texto que vem a seguir: 1 dramas sociais; 2 relações entre dramas sociais e dramas estéticos; 3 símbolos e montagens; e 4 paradigmas do teatro na antropologia. Uma observação: nesse exercício de repensar algumas contribuições "clássicas" de Victor Turner, Erving Goffman e Richard Schechner, encontro "afinidades eletivas" entre, por um lado, o pensamento de Walter Benjamin e a dramaturgia de Bertolt Brecht, e, por outro, os princípios dramatúrgicos dos "bóias-frias".The anthropology of performance, as understood by Victor Turner, provides interesting perspectives for the analysis of what may be referred to as the "theater of bóias-frias". Conversely, this theater may be of special interest for purposes of rethinking some of the main propositions which have arisen on the borders between anthropology and performance. Considering the specificity of "the practice which calculates the place from which one views things" of this theater, several topics present themselves as guidelines for the text which follows: 1 social dramas, 2 relations between social and aesthetic dramas, 3 symbols and montage, and 4 theater paradigms in anthropology. In this exercise to rethink some of the "classic" contributions of Victor Turner, Erving Goffman, and Richard Schechner, "elective affinities" have been found between, on the one hand, the writings of Walter Benjamin and Brechtian theater, and, on the other, the dramaturgical principles of the

  7. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  8. Browse Title Index

    African Journals Online (AJOL)

    Items 451 - 500 of 644 ... C Chimphambano, I O Komolafe, A S Muula .... Desirée Witte, Mari Kirsten, Cheryl Louw, Bagrey Ngwira, John C. Victor, Paul H. Gillard, ... Jennifer J. Hull, Nigel Cunliffe, Khuzwayo C. Jere, Sung-Sil Moon, Yuhuan Wang, ...

  9. 2018-05-05T21:20:14Z https://www.ajol.info/index.php/all/oai oai:ojs ...

    African Journals Online (AJOL)

    article/37925 2018-05-05T21:20:14Z cajeb:ART Macrophyte diversity in polluted and non-polluted wetlands in Cameroon Fonkou, Théophile; BP 377 Dschang, Cameroon Nguetsop, Victor F Pinta, Jonas Y Dekoum, Vincent MA Lekeufack, Martin ...

  10. 78 FR 75929 - National Institute of Dental & Craniofacial Research; Notice of Closed Meetings

    Science.gov (United States)

    2013-12-13

    ... Craniofacial Research Special Emphasis Panel; Review of NIDCR Institutional Career Development Award K12... review and evaluate grant applications. Place: National Institutes of Health, One Democracy Plaza, 6701 Democracy Boulevard, Bethesda, MD 20892. Contact Person: Victor Henriquez, Ph.D., Scientific Review Officer...

  11. Bridge Town Old Inn at the junction of the Awbeg Mill and the Blackwater

    OpenAIRE

    Brocas, Henry (Irish painter, draftsman, and engraver, 1766-1838)

    1997-01-01

    Bridgetown Abbey, seen in this drawing in ruins, was a 13th century Augustinian monastery of the priors of St. Victor. Its ruins may be viewed in Castletownroche, County Cork, Ireland near where the River Awbeg meets the Blackwater. (en.wikipedia.org)

  12. Socioeconomic Impact Analysis Study. Disposal and Reuse of George Air Force Base, California, Draft

    Science.gov (United States)

    1991-09-01

    Va.. eCommerc ~~~~~~~~~~~...... .... I Reieta ,00 670 1.10 Pplto opa~dllona 0 800 069 066 40.000W Ak ,200 3.0 5.0 h-’ee 2 ~ Victor Valley CamndalAWW

  13. 77 FR 38477 - IFR Altitudes; Miscellaneous Amendments

    Science.gov (United States)

    2012-06-28

    ... MEA Sec. 95.6001 Victor Routes--U.S. Sec. 95.6016 VOR Federal Airway V16 is Amended to Delete TUCSON... NW 16500 Sec. 95.6366 VOR Federal Airway V366 is Amended to Read in Part HUGO, CO VOR/DME FALCON, CO...

  14. Download this PDF file

    African Journals Online (AJOL)

    NESG PUBLICATIONS

    2009-04-03

    Apr 3, 2009 ... Since the reprise of civilian rule in 1999, ... It seems Nigeria is yet to learn from its history; or has it failed to .... Victor E. Dike is an Adjunct Professor at the School of Engineering & Technology, National University (Sacramento ...

  15. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  16. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  17. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  18. Emem ......... 53 geria: A Victor S. .......... 69 ocratic - Osuya

    African Journals Online (AJOL)

    life is complex and tri-dimensional to a certain degree, the playwright has time and ..... Phillips, who pursues his ambition at all costs, and the British authorities in ... Is Rotimi handicapped by his usual inclination to be largely faithful to his ...

  19. Vom work Book Journal, 2011 2nd Edition Victor

    African Journals Online (AJOL)

    USER

    SUMMARY. Various anaesthetic agents have been used to relieve pain during surgical procedures and are normally followed by antibiotic cover to guard against secondary bacterial infection. This study was aimed at determining the effect of thiopentone anaesthesia on plasma disposition of ampicillin sodium in rabbits.

  20. Vom work Book Journal, 2011 2nd Edition Victor

    African Journals Online (AJOL)

    USER

    Chemotherapy and chemoprophylaxis, coupled with vector control programmes, have been the main stay of ... trypanocidal formulation for its chemo- therapeutic effectiveness before presentation and adoption for ..... trypanocides, which has financial benefit, confers great advantage to the drug. REFERENCES. ABENGA ...

  1. Vom work Book Journal, 2011 2nd Edition Victor

    African Journals Online (AJOL)

    USER

    Histopathological changes consisted of mononuclear cell infiltration ..... respiration observed between days 11-14 post- infection (pi) in .... while these did not occur in any of the SV infected ..... cellular reactions elicited in the skin of goats by.

  2. Vom work Book Journal, 2011 2nd Edition Victor

    African Journals Online (AJOL)

    USER

    half life, exposure rate constant and the Annual. Limit on Intake (ALI) for ... In general, some hazards are associated with. Summary ... Nobel Prize for physics in 1901 (Thrall, 1998). Emerging ... nuclear technology after World War II and the.

  3. Vom work Book Journal, 2011 2nd Edition Victor

    African Journals Online (AJOL)

    USER

    SUMMARY. Adaptation feature of the camel include its ability to feed ... animals. We decided to investigate if these voracious and liberal feeding skills could be at the expense of a healthy ..... abnormalities in camels, since to the best of our.

  4. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  5. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  6. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  7. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  8. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  9. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  10. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  11. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  12. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  13. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  14. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  15. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  16. 76 FR 34761 - Sunshine Act Meeting of the Finance Committee of the Board of Directors; Notice

    Science.gov (United States)

    2011-06-14

    ... LEGAL SERVICES CORPORATION Sunshine Act Meeting of the Finance Committee of the Board of Directors; Notice DATE AND TIME: The Finance Committee of the Legal Services Corporation will meet telephonically on... be fulfilled. Dated: June 9, 2011. Victor M. Fortuno, Vice President, General Counsel & Corporate...

  17. A History of Socio-Cultural Intelligence and Research Under the Occupation of Japan

    Science.gov (United States)

    2009-04-01

    either blinded by ethnocentrism or hypnotized by left-wing propaganda.”18 Additionally, MacArthur and Washington, because of pressing Cold War needs...largely intact. In Germany, the nations of the Allied victors actually created and staffed the government. MacArthur, meanwhile, paired up SCAP

  18. Ramanathan, Prof. Veerabhadran

    Indian Academy of Sciences (India)

    Home; Fellowship. Fellow Profile. Elected: 2014 Honorary. Ramanathan, Prof. Veerabhadran. Date of birth: 24 November 1944. Address: Distinguished Victor C Alderson Professor, of Climate Sci., Scripps Institution of, Oceanography, UC at San Diego, 9500 Gilman Drive,MC 0221, La Jolla, CA 92093-0221, USA Contact:

  19. Knowledge-Driven Design of Virtual Patient Simulations

    Science.gov (United States)

    Vergara, Victor; Caudell, Thomas; Goldsmith, Timothy; Panaiotis; Alverson, Dale

    2009-01-01

    Virtual worlds provide unique opportunities for instructors to promote, study, and evaluate student learning and comprehension. In this article, Victor Vergara, Thomas Caudell, Timothy Goldsmith, Panaiotis, and Dale Alverson explore the advantages of using virtual reality environments to create simulations for medical students. Virtual simulations…

  20. South African Medical Journal - Vol 89, No 9 (1999)

    African Journals Online (AJOL)

    Measurements of iron status and survival in African iron overload · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. A Patrick MacPhail, Eberhard M Mandishona, Peter D Bloom, Alan C Paterson, Tracey A Rouault, Victor R Gordeuk ...

  1. African Journal of International Affairs and Development - Vol 5, No ...

    African Journals Online (AJOL)

    DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Victor Ojakorotu, T A Adeola, 48-67. The Non-proliferation Treaty (1968), Developing Countries and World Security: Some Revisitation Reflections · EMAIL FULL TEXT EMAIL FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Dokun Oyesola, 68-82. Nuclear ...

  2. Addressing the Components of Will in the National Strategy for Victory in Iraq

    National Research Council Canada - National Science Library

    Hubner, David S

    2006-01-01

    ... of a hostile population to the will of the victor. There has been much written about the political will and national will as targets in warfare yet within our doctrine the concept of will is not adequately addressed in terms of targeting and effects...

  3. Application of Discrete Event Simulation in Mine Production Forecast

    African Journals Online (AJOL)

    Application of Discrete Event Simulation in Mine Production Forecast. Felix Adaania Kaba, Victor Amoako Temeng, Peter Arroja Eshun. Abstract. Mine production forecast is pertinent to mining as it serves production goals for a production period. Perseus Mining Ghana Limited (PMGL), Ayanfuri, deterministically forecasts ...

  4. Software Engineering Education Directory

    Science.gov (United States)

    1990-04-01

    and Engineering (CMSC 735) Codes: GPEV2 * Textiooks: IEEE Tutoria on Models and Metrics for Software Management and Engameeing by Basi, Victor R...Software Engineering (Comp 227) Codes: GPRY5 Textbooks: IEEE Tutoria on Software Design Techniques by Freeman, Peter and Wasserman, Anthony 1. Software

  5. Set Convergences In Nonlinear Analysis and Optimization (Abstracts) (Convergences en Analyse Multivoque et Unilaterale (Resumes de Conferences),

    Science.gov (United States)

    1992-06-01

    Anal. Appl. 102 (1984), 399-414. 43 On B-subgradients and applications Alejandro Jofre Departamento de Ingenieria Matemrtica, Universidad de Chile...Universitd de Provence51)2S Catania Italic 3, place Victor Hugo 13331 Marseille Cedex Steve Robinson Michel Th~raDepartment of Industrial Engineering

  6. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  7. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  8. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  9. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  10. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  11. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  12. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  13. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  14. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  15. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  16. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  17. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  18. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  19. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  20. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  1. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  2. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  3. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  4. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  5. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  6. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  7. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  8. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  9. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  10. CTIO Staff | CTIO

    Science.gov (United States)

    Detector Engineer Victor Aguirre Electronic Technician Guillermo Dubó Electronic Technician Manuel Martínez Electronic Manager Pedro Vergara Instrument Maker Víctor Pinto Instrument Maker Jaime Cruz Observer Juan Andrade Mechanic Assistant Manuel Hernández Observer Support Claudio Aguilera Assistant

  11. 75 FR 30372 - Foreign-Trade Zone 38-Spartanburg County, SC; Application for Reorganization/Expansion under...

    Science.gov (United States)

    2010-06-01

    ... total)--International Transport Center, Victor Hill Rd., Greer, and Gateway International Business... operators/users located within a grantee's ``service area'' in the context of the Board's standard 2,000...., Laurens; Site 6 (20 acres)--Lakeside Business Center, 2355 Hwy. 101 South, Greer; Site 7 (19 acres)--ZF...

  12. Tundlikud ja tundelised / Aita Kivi

    Index Scriptorium Estoniae

    Kivi, Aita, 1954-

    2001-01-01

    Sisu : David Herbert Lawrence. Vikerkaar; Kazuo Ishiguro. Hõljuva maailma kunstnik; Vassil Bõkav. Toru; Torcuato Luca de Tena. Jumala käega; Roxanne Pulitzer. Carrie ja Gracie; Graham Robb. Victor Hugo; Scott Adams. Dilberti printsiip; Andrea Fehringer, Gerald Reischl, Clemens Stadlbauer. Sajandi suurimad pigilinnud; Gertrud Teusen. Jonniiga

  13. A World of Magic: Conference Papers from the Selected Sessions of the AACRAO Annual Meeting (79th, Orlando, FL, April 18-23, 1993).

    Science.gov (United States)

    Russell, Michele, Ed.

    Papers on aspects of college admission, records, and institutional research functions are: "How To Improve Office Morale" (Victor Swenson); "Staff Meetings: How To Save Hours per Month and Develop Your Staff" (LuAnn Harris, Shelley Olsen); "Selling SPEED/ExPRESS" (Laura Patterson, Thomas Scott); "Advisement and…

  14. BOOK REVIEW: Democracy and Political Life in Nigeria | Wilson ...

    African Journals Online (AJOL)

    In this review of Victor Dike's book - \\"Democracy and Political Life in Nigeria\\", Inam Wilson underscores the author's attempts to draw a connection between Nigeria's chequered political history and her present economic trajectory to explain why Nigeria is today facing numerous sociopolitical and economic challenges, ...

  15. Antologi om Visuelle Felt-& Analyse Metoder

    DEFF Research Database (Denmark)

    Lundberg, Pia

    andet baseret på det poetiske princip, af Edgar Allan Poe, som blev udgivet posthumt i 1850. Derudover anvendes antropologerne Victor Turner & Edward Bruners teoretiske arbejder om forskellige kulturæstetiske fænomener og udtryk (fx Bruner 1986). Sidst men ikke mindst anvendes de kulturvidenskabelige...

  16. Active biomonitoring of a subtropical river using glutathione-S ...

    African Journals Online (AJOL)

    Active biomonitoring of a subtropical river using glutathione-S-transferase (GST) and heat shock proteins (HSP 70) in. Oreochromis niloticusas surrogate biomarkers of metal contamination. Victor Kurauone Muposhi1, Beaven Utete1*, Idah Sithole-Niang2 and Stanley Mukangenyama2. 1Wildlife Ecology and Conservation, ...

  17. Phye's Procession : Culture, Politics and Peisistratid Rule

    NARCIS (Netherlands)

    Blok, J.H.

    2000-01-01

    In his account of Peisistratos' tyranny, Herodotos relates a notorious incident. After the tyrant had been expelled by the combined efforts of his opponents Megakles and Lykourgos, the renewed rivalry between the victors set Megakles to enter into an agreement with the erstwhile loser. In order

  18. Congenital heart disease and pulmonary arterial hypertension : End of an era?

    NARCIS (Netherlands)

    Blok, I.M.

    2017-01-01

    Many years ago Victor Eisenmenger was the first to describe a cyanotic patient with a condition he did not fully understand. He named it Eisenmenger syndrome. A century later physicians and researchers still struggle to deliver optimal care to patients with Eisenmenger syndrome and other forms of

  19. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  20. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  1. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  2. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  3. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  4. 1912 – 2012: a century of studying cosmic rays

    CERN Multimedia

    Anaïs Schaeffer

    2012-01-01

    One year ago, the Alpha Magnetic Spectrometer was docked to the International Space Station. This state-of-the-art tool for studying cosmic rays has revolutionised methods of detecting cosmic radiation, which was discovered barely a century ago.   Victor Francis Hess (in the basket), back from his balloon flight in August 1912. Source: American Physical Society. Exactly one hundred years ago, the Austrian-American physicist Victor Francis Hess discovered cosmic rays. The researcher observed the phenomenon while on board a balloon; he found that at an altitude of 1,000 to 5,000 metres, the wires of his Wulf electrometer (a tool used to measure radiation) showed an increase in electrical charge. Hess had just proven the existence of ionising radiation coming from outside the Earth’s atmosphere. Twenty years or so later, the invention of the Geiger-Müller counter enabled physicists to study the properties of the rays more precisely. One century later, cosmic rays and the ques...

  5. [Viktor Borisovich von Gyubbenet--a military physician, a surgeon and a social activist].

    Science.gov (United States)

    Ishutin, O S

    2015-02-01

    The current article is dedicated to a talented surgeon, an organizer of military health care, an extraordinary personality and a public figure--Doctor of Medicine, a privy councilor Victor Borisovich von Guebbenet. A talent of von Gyubbenea as a doctor-surgeon and an organizer of the surgical help on theater of war was especially brightly shown during two big military conflicts of the beginning of the XX century--the Russo-Japanese War (1904-1905) and the First World War I (1914-1918). In the first case doctor von Gyubbenet, being a surgeon of the 3rd Siberian corps successfully manage the activity of military-medical divisions and establishments of Port Arthur garrison. In the second military conflict Victor Borisovich as a doctor and an organizer headed sanitary part of armies of the Western front and successfully directed a medical support of armies of the front since 1915 and until the end of war.

  6. Theater of "bóias-frias": rethinking anthropology of performance

    Directory of Open Access Journals (Sweden)

    John C. Dawsey

    2006-01-01

    Full Text Available The anthropology of performance, as understood by Victor Turner, provides interesting perspectives for the analysis of what may be referred to as the "theater of bóias-frias". Conversely, this theater may be of special interest for purposes of rethinking some of the main propositions which have arisen on the borders between anthropology and performance. Considering the specificity of "the practice which calculates the place from which one views things" of this theater, several topics present themselves as guidelines for the text which follows: 1 social dramas, 2 relations between social and aesthetic dramas, 3 symbols and montage, and 4 theater paradigms in anthropology. In this exercise to rethink some of the "classic" contributions of Victor Turner, Erving Goffman, and Richard Schechner, "elective affinities" have been found between, on the one hand, the writings of Walter Benjamin and Brechtian theater, and, on the other, the dramaturgical principles of the bóias-frias.

  7. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  8. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  9. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  10. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  11. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  12. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  13. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  14. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  15. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  16. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  17. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  18. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  19. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  20. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  1. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  2. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  3. Evaluation of Lime and Persulfate Treatment for Mixed Contaminant Soil from Plum Brook Ordnance Works (Sandusky, OH)

    Science.gov (United States)

    2007-09-01

    OH) Victor F. Medina, Scott A. Waisner, Agnes B. Morrow, Catherine C. Nestler, and Michael Jones September 2007 E nv ir on m en ta l L ab or... hydroxyapatite , and calcium, sodium, potassium, and ammonium phosphates Tardy et al. (2003). Several recent studies have also reported that phosphate

  4. Tundmatu eesti disain / Ivar Sakk

    Index Scriptorium Estoniae

    Sakk, Ivar, 1962-

    2006-01-01

    Eesti disainist, selle teadvustamisest, disainiajaloo puudumisest. Eesti keraamika ajaloost on kirjutanud Leo Rohlin, klaasikunsti ajaloost Maie-Ann Raun, sisearhitektuuri ajaloost Krista Kodres. Kai Lobjakas on kirjutanud ülevaate "Märkmeid eesti disainist". Saksa disaineri Serge Rompza ja ameerika disainiteoreetiku Victor Margolini arvamusest näituse "Ajast ees" kohta

  5. Brains versus Brawn: Classed and Racialized Masculinity in Literacy Narratives by Rose, Rodriguez, Villanueva, and Gilyard

    Science.gov (United States)

    Launius, Christie

    2009-01-01

    A feminist reading of four prominent literacy narratives--Mike Rose's "Lives on the Boundary," Richard Rodriguez's "Hunger of Memory," Victor Villanueva's "Bootstraps," and Keith Gilyard's "Voices of the Self"--shows that conflicts and anxieties about the consequences of schooling on working-class masculinity animate these texts. Each of these…

  6. Journal of Social Development in Africa - Vol 33, No 1 (2018)

    African Journals Online (AJOL)

    Special issue on socal security and social protection in honour of Professor Kaseke · EMAIL FULL TEXT EMAIL FULL TEXT DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT. Victor N. Muzvidziwa. Ode to an African intellectual giant: Kaseke, the champion of indigenous scholarly work · EMAIL FULL TEXT EMAIL FULL ...

  7. pablo s luna-lozano

    Indian Academy of Sciences (India)

    PABLO S LUNA-LOZANO. Articles written in Sadhana. Volume 41 Issue 8 August 2016 pp 847-853. Digital architecture for a piecewise-linear arbitrary-waveform generator · VICTOR M JIMENEZ-FERNANDEZ HECTOR VAZQUEZ-LEAL PABLO S LUNA-LOZANO J L VAZQUEZ-BELTRAN G GARCIA-SANTIAGO E VALDES- ...

  8. Tants Tõrvaaugu ümber / Lii Sammler

    Index Scriptorium Estoniae

    Sammler, Lii, 1963-

    2008-01-01

    Järvamaal asuvast Tõrvaaugu jahilossist, mille laskis 1914. a. ehitada Kabala mõisnik parun Victor von Taube. Kuni 1930. aastani oli majas Rassi algkool, 1944.-1946. a. kasutas jahilossi Viljandi vangla. 1999. a. ostis jahilossi ära Eesti Skautide Ühing. Hoone on ennistatud skaudilaagri teenindusmajaks. 15 ill

  9. An ancient greek pain remedy for athletes

    DEFF Research Database (Denmark)

    Bartels, Else M.; Swaddling, Judith; Harrison, Adrian Paul

    2006-01-01

    and swellings, which was reserved for use by the winners of Olympic events, the so-called "Fuscum Olympionico inscriptum"-(ointment) entitled "dark Olympic victor's". In a time when the Olympic games have recently returned to their homeland, we examine the potential efficacy of this ancient remedy in terms...

  10. 75 FR 69444 - Change in Bank Control Notices; Acquisitions of Shares of a Bank or Bank Holding Company

    Science.gov (United States)

    2010-11-12

    ... November 26, 2010. A. Federal Reserve Bank of Chicago (Colette A. Fried, Assistant Vice President) 230 South LaSalle Street, Chicago, Illinois 60690-1414: 1. Robert John Dentel, Victor, Iowa, and Mary P. Howell, Ames, Iowa, individually; and the Robert John Dentel Family (Robert J. Dentel, Patricia A. Dentel...

  11. Advances in highly specific plant gene silencing by artificial miRNAs

    African Journals Online (AJOL)

    SAM

    2014-05-07

    May 7, 2014 ... transcribed sense and antisense RNAs (Wesley et al.,. 2001; Chuang and Meyerowitz, 2000). MicroRNAs (miRNA), which negatively regulate gene expression, are endogenous single-stranded small RNA molecules 21 to 23 nucleotides long. They were first dis- covered in the Victor Ambros Laboratory ...

  12. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  13. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  14. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  15. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  16. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  17. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  18. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  19. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  20. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  1. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  2. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  3. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  4. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  5. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  6. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  7. The “Common Solutions" Strategy of the Experiment Support group at CERN for the LHC Experiments

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    After two years of LHC data taking, processing and analysis and with numerous changes in computing technology, a number of aspects of the experiments’ computing as well as WLCG deployment and operations need to evolve. As part of the activities of the Experiment Support group in CERN’s IT department, and reinforced by effort from the EGI-InSPIRE project, we present work aimed at common solutions across all LHC experiments. Such solutions allow us not only to optimize development manpower but also offer lower long-term maintenance and support costs. The main areas cover Distributed Data Management, Data Analysis, Monitoring and the LCG Persistency Framework. Specific tools have been developed including the HammerCloud framework, automated services for data placement, data cleaning and data integrity (such as the data popularity service for CMS, the common Victor cleaning agent for ATLAS and CMS and tools for catalogue/storage consistency), the Dashboard Monitoring framework (job monitoring, data management...

  8. The "Common Solutions" Strategy of the Experiment Support group at CERN for the LHC Experiments

    CERN Document Server

    Girone, M; Barreiro Megino, F H; Campana, S; Cinquilli, M; Di Girolamo, A; Dimou, M; Giordano, D; Karavakis, E; Kenyon, M J; Kokozkiewicz, L; Lanciotti, E; Litmaath, M; Magini, N; Negri, G; Roiser, S; Saiz, P; Saiz Santos, M D; Schovancova, J; Sciabà, A; Spiga, D; Trentadue, R; Tuckett, D; Valassi, A; Van der Ster, D C; Shiers, J D

    2012-01-01

    After two years of LHC data taking, processing and analysis and with numerous changes in computing technology, a number of aspects of the experiments' computing, as well as WLCG deployment and operations, need to evolve. As part of the activities of the Experiment Support group in CERN's IT department, and reinforced by effort from the EGI-InSPIRE project, we present work aimed at common solutions across all LHC experiments. Such solutions allow us not only to optimize development manpower but also offer lower long-term maintenance and support costs. The main areas cover Distributed Data Management, Data Analysis, Monitoring and the LCG Persistency Framework. Specific tools have been developed including the HammerCloud framework, automated services for data placement, data cleaning and data integrity (such as the data popularity service for CMS, the common Victor cleaning agent for ATLAS and CMS and tools for catalogue/storage consistency), the Dashboard Monitoring framework (job monitoring, data management m...

  9. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  10. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  11. Changing project finance climate; Project finance wo meguru kankyo henka

    Energy Technology Data Exchange (ETDEWEB)

    Madono, S. [The Export-Import Bank of Japan, Tokyo (Japan)

    1998-03-01

    Development of conditions under which project financing (PF) functions is described. PF, a method with which funds are procured for a project on the security of the assets of and the cash flow involving the project, established its position as a popular financial means. Into the 1990, however, PF underwent a complete change, when it came to be actively employed as a means for the procurement of money for what is called `infrastructure building project for invigorating the private sector` in the developing countries. PF has now come to be utilized for the financing of projects in various fields besides the field of resources exploitation. In particular, PF is now utilized in schemes such as BOT (build, operate, transfer) in public enterprises, for instance, electric power utilities in developing countries. The gravest problem found in the private sector invigorating type PF is that the sponsor, operator, exporter, and lender on their respective levels are experiencing rising risks because of intensified competition in the presence of a great number of projects. Such risks involve the exchange rate, the completion of work, and the relations between the borrower and operator. 2 figs.

  12. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  13. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  14. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  15. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  16. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  17. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  18. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  19. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  20. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  1. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  2. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  3. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  4. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  5. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  6. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  7. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  8. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  9. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  10. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  11. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  12. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  13. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  14. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  15. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  16. Managing externally financed projects: the Integrated Primary Health Care Project in Bolivia.

    Science.gov (United States)

    Homedes, N

    2001-12-01

    Bolivia is one of the poorest countries in Latin America. Health indicators are very poor, communicable diseases are prevalent and, coupled with malnutrition, remain the major killers of children under 5 years old. The Integrated Primary Health Care Project (PROISS) was a US$39 million project executed by the Ministry of Health (MOH), 50% financed by the World Bank and aimed at improving primary health care in the four largest Bolivian municipalities. The implementation of the project started in 1990 and ended in 1997. During implementation it went through three distinct phases: Phase 1 (1990-94) was a period characterized by conflict and confusion; Phase 2 (1995-mid-1996) documented major improvements in coverage and service quality; and Phase 3 (mid-1996-97) witnessed the decline of the project. This paper explores the factors that contributed to the success and the decline of the project, draws lessons for project managers and international agencies involved in the definition and implementation of social sector projects, and discusses the unlikelihood that externally financed projects can have a sustainable impact on the development of the health sector of recipient countries.

  17. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  18. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  19. Our Friendship Gardens: Healing Our Mother, Ourselves

    Science.gov (United States)

    Prakash, Madhu Suri

    2015-01-01

    Embracing the best ideals of Victory Gardens, this essay celebrates Friendship Gardens. The latter go further: collapsing the dualisms separating victors from losers. Friendships that transcend differences and honor diversity are among the many fruits and organic gifts harvested and shared in the commons created by Friendship Gardens. This essay…

  20. An Introduction to the Conjugate Gradient Method that Even an Idiot Can Understand

    Science.gov (United States)

    1994-03-07

    to Omar Ghattas, who taught me much of what I know about numerical methods, and provided me with extensive comments on the first draft of this article...Dongarra, Victor Eijkhout, Roldan Pozo, Charles Romine, and Henk van der Vorst, Templates for the solution of linear systems: Building blocks for iterative

  1. VET Providers Planning to Deliver Degrees: Good Practice Guide

    Science.gov (United States)

    National Centre for Vocational Education Research (NCVER), 2015

    2015-01-01

    This good practice guide is intended to assist public and private registered training organisations (RTOs) planning to commence higher education (HE) delivery. The guide is based on research undertaken by Victor Callan and Kaye Bowman, who completed case studies with six providers currently delivering higher education qualifications in addition to…

  2. Playful and Mindful Interactions in the Recursive Adaptations of the Zone of Proximal Development: A Critical Complexity Science Approach

    Science.gov (United States)

    Raia, Federica; Deng, Mario C.

    2011-01-01

    We discuss Konstantinos Alexakos, Jayson Jones and Victor Rodriguez's hermeneutic study of formation and function of kinship-like relationships among inner city male students of color in a college physics classroom. From our Critical Complexity Science framework we first discuss the reading "erlebnisse" of students laughing at and with each other…

  3. 78 FR 77777 - Qualification of Drivers; Exemption Applications; Vision

    Science.gov (United States)

    2013-12-24

    ... vision requirement if the exemptions will provide a level of safety that is equivalent to or greater than... Alex M. Long Charles McDonald Kenneth C. Mead Abdelkhaleq R. Muhammad Eduardo Nunez Michael J... suspension during the 3-year period: Buck J. Barney Charles R. Edwards The following applicant, Victor A...

  4. Fulltext PDF

    Indian Academy of Sciences (India)

    discoverer of microRNAs (with Victor Ambros, University of Massachusetts), regarded ... subsequently accepted a faculty position at Harvard, where he is currently Professor of .... of course, you are gonna discover wacko things, who cares? .... In fact, I just read Steven Job's biography and realized that if I had gone to ...

  5. Arterial pressure oscillations are not associated with muscle sympathetic nerve activity in individuals exposed to central hypovolaemia

    Science.gov (United States)

    2011-09-19

    and Victor A. Convertino1 1US Army Institute of Surgical Research, Fort Sam Houston, TX 78234, USA 2Department of Health and Kinesiology , University of...during intense lower body negative pressure to presyncope in humans. J Physiol 587, 4987–4999. Cooke WH, Ryan KL & Convertino VA (2004). Lower body

  6. Tonemic Substitution

    African Journals Online (AJOL)

    Ezenwafor

    themes and issues explored in African American literature are the role of African ... William Wells Brown (1814 – 1884) and Victor Sejour. (1817 – 1874) are .... innocence, while the moral foundation of the children was forcefully corrupted. ..... Skaggsy insinuated that he was looking around for business prospects and this ...

  7. The Time Has Come to Create Meaning-Making Centers on College Campuses

    Science.gov (United States)

    Nash, Robert J.; Jang, Jennifer J. J.

    2013-01-01

    Robert J. Nash and Jennifer J. J. Jang argue that students have a great need to find a "meaning to live for," à la Victor Frankl, and make a case for creating a space for students and educators to contextualize learning experiences dealing with the universal, existential questions of life.

  8. Structure, Function and Diversity of the Healthy Human Microbiome

    Science.gov (United States)

    2012-06-14

    Durbin, R. Fast and accurate long-read alignment with Burrows –Wheeler transform. Bioinformatics 26, 589–595 (2010). 26. Giannoukos, G. et al...Feldgarden2, Victor M. Felix7, Sheila Fisher2, Anthony A. Fodor41, Larry J. Forney42, Leslie Foster6, Valentina Di Francesco19, Jonathan Friedman43

  9. C P Anil Kumar

    Indian Academy of Sciences (India)

    Home; Journals; Journal of Earth System Science. C P Anil Kumar. Articles written in Journal of Earth System Science. Volume 124 Issue 8 December 2015 pp 1721-1733. Variation of surface electric field during geomagnetic disturbed period at Maitri, Antarctica · N Jeni Victor C Panneerselvam C P Anil Kumar.

  10. 78 FR 15356 - Caribbean Fishery Management Council; Public Meetings

    Science.gov (United States)

    2013-03-11

    .... Virgin Islands: Compatibility of Trip and Bag Limits --Summary of Public Hearings --Public Comment Period... Licenses/Permits --Letter from Victor Padilla Re: Trap Poaching in the EEZ and Local Waters --U.S. Virgin... before this group for discussion, those issues may not be subjects for formal action during this meeting...

  11. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  12. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  13. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  14. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  15. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  16. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  17. Ultra advanced projects. ; Naming hyper-hightech projects. (Cho) no tsuku project. ; Naming no shikumi

    Energy Technology Data Exchange (ETDEWEB)

    Goto, Y. (Ministry of International Trade and Industry, Tokyo (Japan))

    1992-10-05

    Significance of using 'super' for naming a project of technological development is discussed. Functions of naming are classified into (1) recognition, (2) display and (3) sales-promotion, whereby mechanism of naming of merchandise that is developed through the technique of 3 is considered. Further, the mechanism of naming is discussed in relation to marketing. It is pointed out that naming of merchandise is determined on the basis of (1) concept of planned goods and (2) marketing-mixes composed of goods, price, sales-roots and sales-promotion. The same mechanism works also in a project for technological development. Technical trends are caught and projects are targetted by taking supposed regimes into account, thereby the most suitable mix is formed. The mix in the technological development is assumed to be composed of purpose, specification, regime and sales-promotion. Two examples of the governmental projects by Ministry of International Trade and Industry, 'the big regime for research and development on industrial technologies' and 'the regime for development of the fundamental technologies in the next generation' are introduced and the significance of their naming is described. 2 tabs.

  18. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  19. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  20. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  1. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  2. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  3. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  4. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  5. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  6. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  7. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  8. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  9. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  10. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  11. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  12. The Canada Goose Project: A First Project with Children under 3

    Science.gov (United States)

    Brewer, Ruth A.

    2010-01-01

    This project report describes how five children (an infant, three toddlers, and a preschooler) enrolled at a private day care home engaged in their first journey into project work through a study of Canada geese living on a nearby body of water. Prior to the experience described in this paper, the author had used the Project Approach only with…

  13. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  14. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  15. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  16. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site

  17. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  18. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  19. The Human Genome Diversity Project

    Energy Technology Data Exchange (ETDEWEB)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  20. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  1. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  2. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  3. The 100 People Project

    Science.gov (United States)

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  4. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  5. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  6. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    Science.gov (United States)

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  7. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  8. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  9. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  10. The Top 100 Business, Education, Engineering and Social Sciences Degrees Conferred on Hispanic Students

    Science.gov (United States)

    Diverse: Issues in Higher Education, 2011

    2011-01-01

    Each year, "Diverse: Issues In Higher Education" publishes lists of the Top 100 producers of associate, bachelor's and graduate degrees awarded to minority students based on research conducted by Dr. Victor M. H. Borden, professor of educational leadership and policy studies at Indiana University Bloomington. This article presents lists of the top…

  11. JPRS Report China QIUSHISeeking Truth No, 1 December 1989

    Science.gov (United States)

    1990-02-06

    two here. When you read those vivid and catchy titles and lyrical comments with strong political content, the image of a victor and a revolutionary...In my essay "Love for Green Hills," published in 1980,1 suggested "letting those living on a mountain live off the mountain by developing the

  12. H : disainialfabeet / Kai Lobjakas

    Index Scriptorium Estoniae

    Lobjakas, Kai, 1975-

    2006-01-01

    Tutvustatakse taani disainerit, arhitekti ja kriitikut Poul Henningseni (1894-1967), austria arhitekti ja disainerit Josef Hoffmanni (1870-1956), belgia arhitekti Victor Hortat (1861-1947), argentiina päritolu disainerit Alfredo Häberlit (sünd. 1964, Buenos Aires), Herman Milleri nimelist mööblitootmisettevõtet (asutatud 1923) USA-s, high-tech stiili

  13. This Isn't Business, It's Personal: Personal Narratives in the Field of Composition Studies

    Science.gov (United States)

    Golar, Norman

    2010-01-01

    I focus on three critical autobiographies in the field of composition studies: Mike Rose's "Lives on the Boundary: A Moving Account of the Struggles and Achievements of America's Educationally Underprepared," Keith Gilyard's "Voices of the Self: A Study of Language Competence," and Victor Villanueva, Jr.'s "Bootstraps: From an American Academic of…

  14. Art Education Today: Neither Millennium nor Mirage.

    Science.gov (United States)

    Eisner, Elliot W.

    1997-01-01

    Reprints the 1966 article as a representative example of thinking about art education during the 1960s. Primarily answers criticisms raised by Victor D'Amico in his attack on the current state of art education, and art education research in particular. Defends this research against charges of irrelevancy and academic indulgence. (MJP)

  15. La querelle des deux ecoles (The Quarrel of the Two Schools).

    Science.gov (United States)

    Kimmel, Alain

    1994-01-01

    The debate over financing private education with public funds in France is chronicled, beginning with a review of the issues's history since 1848 and examining events leading to and following a demonstration on January 14, 1994. Legislative testimony of Victor Hugo, modern political cartoons, and data from a recent newspaper are included. (MSE)

  16. East Europe Report

    Science.gov (United States)

    1986-10-22

    because they are "ours," as one of the attackers explained. The owner caught inside received light injuries . The "victors" triumphantly began singing...complete silence, several adolescents gathered up the corn. One of the crowd kicked the head of one of the "shopowners" with a classic karate gesture

  17. Resonance – Journal of Science Education | Indian Academy of ...

    Indian Academy of Sciences (India)

    Gary Ruvkun is a winner of the 2015 Breakthrough Prize in Life Sciences. He is a codiscoverer of microRNAs (with Victor Ambros, University of Massachusetts), regarded as one of the seminal discoveries of 21st century molecular biology. In addition to the Breakthrough Prize, Ruvkun and Ambros have received the Warren ...

  18. Socrates Does Shakespeare: Seminars and Film

    Science.gov (United States)

    Moeller, Victor

    2005-01-01

    Author Victor Moeller contends that authentic learning begins only when teachers challenge students with real questions that demand solutions. Here, he aims to help teachers of the next generation develop skills of independent, reflective, and critical thinking with this book. It explains how to use film to bring Shakespeare to life through…

  19. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  20. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  1. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  2. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  3. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  4. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    Science.gov (United States)

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  5. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  6. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  7. Game Plans for Victors: New Skills for Severely Handicapped Children.

    Science.gov (United States)

    Schoen, Sharon; And Others

    The paper describes an approach in which games were planned to provide instruction for three severely handicapped children (5-6 years old) with few leisure, social, or academic skills and many aberrant behaviors. The first of two games involved a language program to teach verbal interactions, picture identification, and picture matching. The…

  8. David G. Victor gaasitööstuse tulevikust / Kristiina Kaju

    Index Scriptorium Estoniae

    Kaju, Kristiina

    2011-01-01

    Ülevaade California Ülikooli õppejõu, rahvusvahelise õiguse ja regulatsiooni valdkonna juhi, energiapoliitika ning maagaasi osatähtsuse uurija osalusel valminud kogumikust "Natural Gas and Geopolitics: from 1970 to 2040" (Cambridge 2006). Ettepanekust luua energiastabiilsuse amet

  9. Computing one of Victor Moll's irresistible integrals with computer algebra

    Directory of Open Access Journals (Sweden)

    Christoph Koutschan

    2008-04-01

    Full Text Available We investigate a certain quartic integral from V. Moll's book “Irresistible Integrals” and demonstrate how it can be solved by computer algebra methods, namely by using non-commutative Gröbner bases. We present recent implementations in the computer algebra systems SINGULAR and MATHEMATICA.

  10. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  11. Relationships and project marketing success

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki; Lindblom, Jarno

    2002-01-01

    Project operations are a dominating mode of international business. Managing relationships and networks is crucial to project marketing success both at the level of the individual project and at the level of multiple projects. This article first defines key characteristics of project business, id...

  12. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  13. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  14. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  15. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  16. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  17. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  18. Three domains of project organising

    OpenAIRE

    Winch, Graham M.

    2014-01-01

    It has become axiomatic in research on project organising that projects are temporary organisations. Yet there are a number of challenges to this axiom: research on matrix organisation, the embeddedness of projects in project ecologies, and projectification all emphasise the relationship of the project to permanent organisations. Similarly, research on project-based firms and owner organisations which are relatively permanent challenges this axiom. This paper develops a conceptual framework w...

  19. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  20. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  1. Multi-Role Project (MRP): A New Project-Based Learning Method for STEM

    Science.gov (United States)

    Warin, Bruno; Talbi, Omar; Kolski, Christophe; Hoogstoel, Frédéric

    2016-01-01

    This paper presents the "Multi-Role Project" method (MRP), a broadly applicable project-based learning method, and describes its implementation and evaluation in the context of a Science, Technology, Engineering, and Mathematics (STEM) course. The MRP method is designed around a meta-principle that considers the project learning activity…

  2. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  3. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  4. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  5. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  6. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  7. Slides with no attached paper

    International Nuclear Information System (INIS)

    Warin, Dominique; Wallenius, Janne; Ouzounian, Gerald; Wikberg, Peter; Todd, Terry A.; Kormilitsyn, Mikhael V.; Osipenko, Alexander G.; Mayorshin, A.A.; McLachlan, Fiona; Nash, Ken L.; Nilsson, M.; Grimes, T.; Braley, J.C.; TAKESHITA, Kenji; Babain, Vasiliy A.; Spendlikova, I.; Distler, P.; John, J.; Sebesta, F.; VU, Trong-Hung; SIMONIN, Jean-Pierre; PAULENOVA, Alena; PRECEK, Martin; HARTIG, Kyle; KNAPP, Nathan; Vidick, Geoffrey; Bouslimani, Nouri; Desreux, Jean F.; Lewis, F.W.; Hudson, M.J.; Harwood, L.M.; Nunez, Ana; Nagarajan, K.; Vasudeva Rao, P.R.; Raj, Baldev; Ignatiev, Victor; Surenkov, Alexander; Pouchon, Manuel A.; Skarnemark, Gunnar; Allard, Stefan; Ekberg, Christian; Retegan, Teodora; Nordlund, Anders; John, Jan; Maershin, Alexander; Zakirov, R.; Panov, A.; Toropov, Andrey

    2010-01-01

    This document brings together the different presentations (slides) given at the workshop but with no attached paper. These slides refer to the following presentations: - Presentation of ITN (Instituto Tecnologico e Nuclear); - Minor Actinide Partitioning (Dominique Warin); - Transmutation (Janne Wallenius); - Radioactive Waste Management, IGD-TP (Gerald Ouzounian); - Present status of the Swedish nuclear waste management programme (Peter Wikberg); - The U.S. Fuel Cycle Research and Development Program - Separations Research and Development (Terry Todd); - Strategies and national programs of closed fuel cycles - Russian Expert Vision (Mikhael Kormilitsyn) - Extraction Studies Of Potential Solvent Formulations For The GANEX Process (Fiona MacLachlan); - Investigations of The Fundamental Chemistry of the TALSPEAK Process (Ken Nash); - Extraction Separation of Trivalent Minor Actinides and Lanthanides by Hexa-dentate Nitrogen-donor Extractant, TPEN, and its Analogs (Kenji Takeshita); - Fluorinated Diluents for HLW Processing - technological point of view (Vasiliy Babain); - Extraction properties of some new pyridine molecules and search for better diluents (Irena Spendlikova); - Kinetics of extraction of Eu 3+ ion by TODGA and CyMe 4 -BTBP studied using the RMC technique (Trong Hung Vu); - Redox Chemistry of Neptunium in Solutions of Nitric Acid (Alena Paulenova); - NMR applied to actinide ions and their complexes. In search of covalency effects (Geoffrey Vidick); - Towards 'Stability Rules' for Radiolysis of bis-DGA compounds (Ana Nunez); - Pyroprocess Research Activities at IGCAR, Kalpakkam, India (K. Nagarajan); - Critical issues of nuclear energy systems employing molten salt fluorides: from ISTC No. 1606 to No. 3749 (1. year of project activity) and MARS/EVOL cooperation (Victor Ignatiev); - Conversion processes: Internal Gelation and the Sphere-pac concept (Manuel Pouchon); - A Combined Nuclear Technology and Nuclear Chemistry Master. A Unique

  8. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  9. The Impact of Project Manager on Project Success – The Case of ICT Sector

    OpenAIRE

    Blaskovics, Bálint

    2016-01-01

    The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand f...

  10. Projective relativity, cosmology and gravitation

    International Nuclear Information System (INIS)

    Arcidiacono, G.

    1986-01-01

    This book describes the latest applications of projective geometry to cosmology and gravitation. The contents of the book are; the Poincare group and Special Relativity, the thermodynamics and electromagnetism, general relativity, gravitation and cosmology, group theory and models of universe, the special projective relativity, the Fantappie group and Big-Bang cosmology, a new cosmological projective mechanics, the plasma physics and cosmology, the projective magnetohydrodynamics field, projective relativity and waves propagation, the generalizations of the gravitational field, the general projective relativity, the projective gravitational field, the De Sitter Universe and quantum physics, the conformal relativity and Newton gravitation

  11. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  12. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  13. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  14. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  15. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  16. Isotopes Project

    International Nuclear Information System (INIS)

    Dairiki, J.M.; Browne, E.; Firestone, R.B.; Lederer, C.M.; Shirley, V.S.

    1984-01-01

    The Isotopes Project compiles and evaluates nuclear structure and decay data and disseminates these data to the scientific community. From 1940-1978 the Project had as its main objective the production of the Table of Isotopes. Since publication of the seventh (and last) edition in 1978, the group now coordinates its nuclear data evaluation efforts with those of other data centers via national and international nuclear data networks. The group is currently responsible for the evaluation of mass chains A = 167-194. All evaluated data are entered into the International Evaluated Nuclear Structure Data File (ENSDF) and are published in Nuclear Data Sheets. In addition to the evaluation effort, the Isotopes Project is responsible for production of the Radioactivity Handbook

  17. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  18. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  19. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  20. RE-SONAN--CEIFeb-ru-aN

    Indian Academy of Sciences (India)

    discovery of energy quanta"; 1921 - to Albert Einstein "for services to theoretical physics, and especially for his discovery of the law of the photoelectric effect"; 1922 - to Niels Bohr" for his investigations of the structure of atoms, and ofthe radiation emanating from them"; 1929 - to Louis Victor de Broglie "for his discovery of the ...

  1. Education: An Exchange of Ideas among Three Humanistic Psychologists.

    Science.gov (United States)

    Ryan, Ellen R.; And Others

    1992-01-01

    Presents fantasized version of discussion among Carl Rogers, Victor Frankl, and Abraham Maslow led by Delbert Obertueffer. All statements in dialog are either direct quotes from their writings or phrases that express their basic philosophy. The hope is that by reviewing the writings of these great leaders, aspects to be applied to education today…

  2. Author Details

    African Journals Online (AJOL)

    Victor, John C. Vol 28, No 3 (2016) - Articles Research Article (New England Journal of Medicine) Effect of human rotavirus vaccine on severe diarrhea in African infants. Abstract PDF. ISSN: 1995-7262. AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors · FAQ's · More about ...

  3. 77 FR 23705 - Combined Notice of Filings #1

    Science.gov (United States)

    2012-04-20

    ... Agreement SCE--RE Victor Phelan Solar One LLC to be effective 4/12/2012. Filed Date: 4/11/12. Accession...-000. Applicants: EGP Stillwater Solar, LLC. Description: EGP Stillwater Solar, LLC Notice of Change in.... ET 5/2/12. Docket Numbers: ER12-1517-000. Applicants: Energia Sierra Juarez U.S., LLC, San Diego Gas...

  4. Author Details

    African Journals Online (AJOL)

    Alumona, Victor S. Vol 18, No 1 (2004) - Articles Gorgias' scepticism regarding Greek social class distinctions in the Funeral Oration (DK.82.BSa) Abstract PDF. ISSN: 1016-0728. AJOL African Journals Online. HOW TO USE AJOL... for Researchers · for Librarians · for Authors · FAQ's · More about AJOL · AJOL's Partners ...

  5. The Post-War British "Re-Education" Policy for German Universities and Its Application at the Universities of Göttingen and Cologne (1945-1947)

    Science.gov (United States)

    Euros, Glesni

    2016-01-01

    The crux of British aims for Germany following the Second World War focused on "re-education" and democratisation. Well aware that the victors' policies following World War One had failed to prevent Germany from pursuing an expansionist path once again, the plan was to help Germany learn from her problematic past. These aims extended to…

  6. Amplify Your Professional Knowledge through RSS

    Science.gov (United States)

    Stephens, Wendy

    2012-01-01

    In the championship playoffs of professional learning tools, this author contends that there is a clear-cut victor. Customizable, platform-agnostic, able to circumvent filters--both browser and network-imposed--RSS is the best professional learning tool. Reading sites via RSS has appeal for those who want the raw information. With a well-honed…

  7. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  8. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  9. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  10. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  11. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  12. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  13. "Cheesy Pizza": The Pizza Project

    Science.gov (United States)

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  14. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  15. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  16. Flaubert lecteur de romans historiques

    Directory of Open Access Journals (Sweden)

    Bernard Gendrel

    2009-12-01

    Full Text Available Les notes de lectures de Flaubert dans sa correspondance permettent de dégager deux types de romans historiques : le roman à sujet ancien, qui se doit, pour être vraisemblable, d'éloigner les personnages en réduisant la part d'explications psychologiques, et le roman à sujet contemporain, qui au contraire allie prise de distance (historique ou sociale et rapprochement (psychologique. Victor Hugo excellerait dans le premier mais pas dans le second. Quant à Flaubert, son obsession sera de réussir dans les deux.Flaubert’s reading notes in his correspondence allow us to identify two types of historical novels: the novel with an ancient subject, which, to be plausible, must keep characters at a distance and limit psychological explanations, and the novel with a contemporary subject which, on the contrary, both keeps aloof from historical or social questions and draws nearer to psychological questions. Victor Hugo excelled in the first but not in the second posture.  As for Flaubert, his obsession was be to be successful in both.

  17. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  18. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  19. Nuclear safety projects 1995

    International Nuclear Information System (INIS)

    Carl-Erik Christoffersen

    1996-01-01

    Action plans for the prevention of contamination in the Arctic regions is concretized in a number of international projects. The Norwegian Radiation Protection Authority is responsible for the follow-up of 13 projects. The report describes the development of these projects in 1995

  20. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...