WorldWideScience

Sample records for utility expansion plans

  1. IRP methods for Environmental Impact Statements of utility expansion plans

    International Nuclear Information System (INIS)

    Cavallo, J.D.; Hemphill, R.C.; Veselka, T.D.

    1992-01-01

    Most large electric utilities and a growing number of gas utilities in the United States are using a planning method -- Integrated Resource Planning (IRP) - which incorporates demand-side management (DSM) programs whenever the marginal cost of the DSM programs are lower than the marginal cost of supply-side expansion options. Argonne National Laboratory has applied the IRP method in its socio-economic analysis of an Environmental Impact Statement (EIS) of power marketing for a system of electric utilities in the mountain and western regions of the United States. Applying the IRP methods provides valuable information to the participants in an EIS process involving capacity expansion of an electric or gas utility. The major challenges of applying the IRP method within an EIS are the time consuming and costly task of developing a least cost expansion path for each altemative, the detailed quantification of environmental damages associated with capacity expansion, and the explicit inclusion of societal-impacts to the region

  2. Electric utility resource expansion planning using environmental externalities

    International Nuclear Information System (INIS)

    Mitchell, D.

    1992-01-01

    This paper describes the recent experience of San Diego Gas ampersand Electric Company using environmental externalities in the expansion planning of its electrical system. This is the first time that this method of planning has been used in the electric utility industry in California. The paper reviews the conceptual development of the monetary values for environmental externalities and shows how the application of these values modifies the resource selection process. This paper should be of interest to professionals involved in policy issues relating to the use of environmental externalities as a means to improve the environment. The experience gained through this analyses should also benefit electric utility personnel involved in planning, and regulators interested in planning

  3. Thai gas expansion plans

    International Nuclear Information System (INIS)

    Hayes, D.

    2001-01-01

    Demand for natural gas in Thailand is increasing significantly as the Electricity Generating Authority of Thailand and the independent private power producers (IPPs) switch from oil to gas to fire their power stations in line with Government policy to reduce oil imports and use more gas from the Gulf of Thailand. The Petroleum Authority of Thailand (PTT) has the sole right to buy and sell natural gas and other petroleum products in Thailand. According to PTT, the surge in demand for natural gas in the first half of 2001 was matched by a fall in demand for refined oil products. The PTT has received Government approval to convert to a limited company ready for listing on the Thai Stock Exchange. This is expected to further increase gas consumption. Details of gas sales to power generation and other industrial sectors by PTT and Unocal, Thailand's largest producer, are given. PTT operations include work to extend its gas pipeline transmission system. A number of new pipeline schemes are planned, including one across southern Thailand to transfer offshore gas from the Joint Development Area gas field owned by Thailand and Malaysia. This has encountered protests over the proposed plant and pipeline route

  4. Energy expansion planning by considering electrical and thermal expansion simultaneously

    International Nuclear Information System (INIS)

    Abbasi, Ali Reza; Seifi, Ali Reza

    2014-01-01

    Highlights: • This paper focused on the expansion planning optimization of energy systems. • Employing two form of energy: the expansion of electrical and thermal energies. • The main objective is to minimize the costs. • A new Modified Honey Bee Mating Optimization (MHBMO) algorithm is applied. - Abstract: This study focused on the expansion planning optimization of energy systems employing two forms of energy: the expansion of electrical and thermal energies simultaneously. The main objective of this investigation is confirming network adequacy by adding new equipment to the network, over a given planning horizon. The main objective of the energy expansion planning (EEP) is to minimize the real energy loss, voltage deviation and the total cost of installation equipments. Since the objectives are different and incommensurable, it is difficult to solve the problem by the conventional approaches that may optimize a single objective. So, the meta-heuristic algorithm is applied to this problem. Here, Honey Bee Mating Optimization algorithm (HBMO) as a new evolutionary optimization algorithm is utilized. In order to improve the total ability of HBMO for the global search and exploration, a new modification process is suggested such a way that the algorithm will search the total search space globally. Also, regarding the uncertainties of the new complicated energy systems, in this paper for the first time, the EEP problem is investigated in a stochastic environment by the use of probabilistic load flow technique based on Point Estimate Method (PEM). In order to evaluate the feasibility and effectiveness of the proposed algorithm, two modified test systems are used as case studies

  5. Sustainable Development Plan for Korea through Expansion of Green IT: Policy Issues for the Effective Utilization of Big Data

    Directory of Open Access Journals (Sweden)

    Hyun Baek

    2015-01-01

    Full Text Available The South Korean government is providing full support for green IT as one of the growth engines of Korea. The purpose of this study is to derive policy issues needed for the sustainable development of Korea through utilizing Big Data by applying green IT. The analysis is done using a Delphi technique. Results show that the establishment of computing platforms that can easily share data and generate value is prioritized for the effective use of Big Data from the environment. In addition, the government-led publication of genetic information and electronic medical records for research purposes has been derived as an important policy issue for the use of bio-Big Data. Besides, a guideline concerning the standardization of machine to machine and Internet of Things communication and data security is needed to effectively use Big Data from machines/things. Moreover, a review of legislation related to the utilization of Big Data from digital media has been derived as an important policy issue. The results of this study propose the direction in which the Korean government should move for green growth through effective utilization of Big Data. The results can be also useful resources for establishing relevant policies for various countries that are accelerating sustainable development.

  6. Utility planning for decommissioning

    International Nuclear Information System (INIS)

    Williams, D.H.

    1982-01-01

    Though the biggest impact on a utility of nuclear power plant decommissioning may occur many years from now, procrastination of efforts to be prepared for that time is unwarranted. Foresight put into action through planning can significantly affect that impact. Financial planning can assure the recovery of decommissioning costs in a manner equitable to customers. Decision-making planning can minimize adverse affects of current decisions on later decommissioning impacts and prepare a utility to be equipped to make later decommissioning decisions. Technological knowledge base planning can support all other planning aspects for decommissioning and prepare a utility for decommissioning decisions. Informed project planning can ward off potentially significant pitfalls during decommissioning and optimize the effectiveness of the actual decommissioning efforts

  7. Decennial plan of expansion 1994-2003

    International Nuclear Information System (INIS)

    1993-12-01

    The Decennial Plan of Expansion 1994-2003 of Electric sector reproduces the results of the studies occurred during the planning cycle of 1992/93 from the Coordinator Groups of the Electric System Planning. Based in the market forecasting, economic-financier and time for finishing the the works, the Decennial Plan of Expansion presents the schedule of the main generation and transmission works for the next ten years, the annual spend in generation, transmission and distribution, the costs of expansion and the evaluation of attending conditions in electric system in Brazil. (C.G.C.)

  8. Factors influencing electric utility expansion. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Masud, E. [ed.

    1977-01-01

    This report, Vol. 2, submitted by the General Electric Co., identifies factors that should be considered in planning interconnected systems and discusses how these factors relate to one another. The objective is to identify all the factors and classify them by their use and importance in arriving at a decision. Chapter 2 discusses the utility system and its system behavior characteristics, emphasizing behavior that affects the planning of the bulk-power generation and transmission system. Chapter 3 introduces interconnection planning by discussing the new system characteristics brought to operation and planning. Forty-two factors associated with cost, reliability, constraints, and coordination are related to each other by factor trees. Factor trees display the relationship of one factor such as reliability to more-detailed factors which in turn are further related to individual characteristics of facilities. These factor trees provide a structure to the presentation. A questionnaire including the 42 factors was completed by 52 system planners from utility companies and government authorities. The results of these questionnaires are tabulated and presented with pertinent discussion of each factor. Chapter 4 deals with generation planning, recognizing the existence of interconnections. Chapter 5 addresses transmission planning, questions related to reliability and cost measures and constraints, and factors related to both analytical techniques and planning procedures. The chapter ends with a discussion of combined generation-transmission planning. (MCW)

  9. Expansion planning for electrical generating systems

    International Nuclear Information System (INIS)

    1984-01-01

    The guidebook outlines the general principles of electric power system planning in the context of energy and economic planning in general. It describes the complexities of electric system expansion planning that are due to the time dependence of the problem and the interrelation between the main components of the electric system (generation, transmission and distribution). Load forecasting methods are discussed and the principal models currently used for electric system expansion planning presented. Technical and economic information on power plants is given. Constraints imposed on power system planning by plant characteristics (particularly nuclear power plants) are discussed, as well as factors such as transmission system development, environmental considerations, availability of manpower and financial resources that may affect the proposed plan. A bibliography supplements the references that appear in each chapter, and a comprehensive glossary defines terms used in the guidebook

  10. Gas fuels Taiwan's expansion plans

    International Nuclear Information System (INIS)

    Hayes, David

    2000-01-01

    The volume of liquid natural gas (LNG) imported into Taiwan is expected to double over the next ten years as the use of natural gas for power generation increases significantly. The Chinese Petroleum Corporation (CPC) expects to import 4.5 million tonnes of LNG in 2000 compared with 4 million tonnes in 1999. CPC is building an undersea, offshore pipeline from the Yung An LNG terminal in the south of Taiwan up the western coastline to the north. The pipeline will supply gas to power stations in the north and city gas companies in Taipei. Combined cycle power plant units at Tungshiao power station are converting to gas and a new power plant at Changsheng will burn LNG. More LNG power plants are planned. LNG is imported from Indonesia and Malaysia to supplement Taiwan's dwindling reserves of natural gas. As well as expanding the existing terminal at Yung An, the CPC is considering the need for a second import terminal. This would probably be financed and operated by the private sector

  11. Considering FACTS in Optimal Transmission Expansion Planning

    Directory of Open Access Journals (Sweden)

    K. Soleimani

    2017-10-01

    Full Text Available The expansion of power transmission systems is an important part of the expansion of power systems that requires enormous investment costs. Since the construction of new transmission lines is very expensive, it is necessary to choose the most efficient expansion plan that ensures system security with a minimal number of new lines. In this paper, the role of Flexible AC Transmission System (FACTS devices in the effective operation and expansion planning of transmission systems is examined. Effort was taken to implement a method based on sensitivity analysis to select the optimal number and location of FACTS devices, lines and other elements of the transmission system. Using this method, the transmission expansion plan for a 9 and a 39 bus power system was performed with and without the presence of FACTS with the use of DPL environment in Digsilent software 15.1. Results show that the use of these devices reduces the need for new transmission lines and minimizes the investment cost.

  12. Expansion plan of the electrical sector; Plan de expansion del sector electrico

    Energy Technology Data Exchange (ETDEWEB)

    Cristerna Ocampo, Rafael [Comision Federal de Electricidad (Mexico)

    1996-07-01

    An analysis of the Mexican electrical market in the year 1994 as far as sales of electrical energy and types of users who utilized that energy, is presented. In addition, an analysis is made of the options for the future supply, where the installed electrical capacity in Mexico in 1994 is described. Also the requirements of additional capacity of power generation, from year 1995 to year 2004 are analyzed. In the internal supply of primary energy in Mexico, the hydrocarbons represent 83%, the diversified sources (nuclear, geothermal, hydro and coal) represent 7% and the biomass as well as complementary coal, the 10% balance of the primary energy. Finally an expansion plan of the transmission network of the Mexican electrical system is described. [Spanish] Se presenta un analisis del mercado electrico mexicano en el ano de 1994 en cuanto a ventas de energia electrica y los tipos de usuarios que utilizaron esa energia. Se hace un analisis ademas, de las opciones para la oferta futura, donde se describe la capacidad electrica instalada de Mexico en 1994. Tambien se analizan los requerimientos de capacidad adicional de generacion de 1995 al 2004. En la oferta interna de energia primaria en Mexico, los hidrocarburos representan el 83%, las fuentes diversificadas (nuclear, geotermia, hidro y carboelectrica) representan el 7% y la biomasa asi como el carbon complementario, el 10% restante de la energia primaria. Finalmente se describe un plan de expansion de la red de transmision del sistema electrico mexicano.

  13. The reference electricity expansion plan of Guatemala

    International Nuclear Information System (INIS)

    Santizo, Rodolfo

    2002-01-01

    This presentation prepared by the Deputy Minister of Energy and Mines overviews the following issues: description of electric power infrastructure, price markets, expansion plans, power and energy demand projections through 2010, including bussiness opportunities for private investment on geothermal and hidro electric power production and distribution market. This presentation is intended for private investors who could be interested in bussiness opportunities of energy generation market in Guatemala

  14. Multi-criteria Generation-Expansion Planning with Carbon dioxide emissions and Nuclear Safety considerations

    International Nuclear Information System (INIS)

    Lee, Hun Gyu; Kim, Young Chang

    2010-01-01

    A multiple criteria decision making (MCDM) method is developed to aid decision makers in Generation Expansion planning and management. Traditionally, the prime objective of an electric utility's generation-expansion planning has been to determine the minimum cost supply plans that meet expected demands over a planning horizon (typically 10 to 30 years). Today, however, the nature of decision environments has changed substantially. Increased policy attention is given to solve the multiple tradeoff function including environmental and social factors as well as economic one related to nuclear power expansion. In order to deal with this MCDM problem, the Analytic Hierarchy Process (AHP) Model is applied

  15. Power system generation expansion planning using the maximum principle and analytical production cost model

    International Nuclear Information System (INIS)

    Lee, K.Y.; Park, Y.M.

    1991-01-01

    Historically, the electric utility demand in most countries has increased rapidly, with a doubling of approximately 10 years in the case of developing countries. In order to meet this growth in demand, the planners of expansion policies were concerned with obtaining expansion pans which dictate what new generation facilities to add and when to add them. This paper reports that, however, the practical planning problem is extremely difficult and complex, and required many hours of the planner's time even though the alternatives examined were extremely limited. In this connection, increased motivation for more sophisticated techniques of valuating utility expansion policies has been developed during the past decade. Among them, the long-range generation expansion planning is to select the most economical and reliable generation expansion plans in order to meet future power demand over a long period of time subject to a multitude of technical, economical, and social constraints

  16. British Gas plans global gas unit expansion

    International Nuclear Information System (INIS)

    Vielvoye, R.

    1991-01-01

    This paper reports on developing a global gas business, a British Gas plc's strategy for evolving a state owned U.K. gas company to a privatized worldwide oil and gas giant. By 2000, BG's global gas business is expected to provide 20% of its revenues, compared with 40% each from its exploration and production operations and its U.K. gas business. The global gas unit (GGU) plans to meet its targets mainly through acquiring holdings in gas transmission and distribution companies around the world. In the 12 months since GGU was established, it has made two such major acquisitions in this area. BG acquired Consumers Gas Co., Ltd., Ontario, Canada's biggest natural gas distribution company, for $943.5 million. It also took a 10% stake in Catalana de Gas SA, Barcelona, the largest privately owned gas utility in Spain and in terms of number of customers, the fourth largest in western Europe. BG also is targeting additional revenues from developing gas fired cogeneration systems in developing countries with gas reserves but no established transmission and distribution systems

  17. RTNS-II utilization plan

    Energy Technology Data Exchange (ETDEWEB)

    Zwilsky, Klaus M.

    1978-09-01

    This plan describes a general program for the effective utilization of this resource by the fusion materials community. Because its flux is low relative to levels expected in commercial fusion reactors, the RINS-II is not expected to produce data of direct engineering significance (with some exceptions). Rather, it will be used chiefly to aid in the development of models of high energy neutron effects. Such models are needed in projecting engineering data obtained in high flux fission reactors to the fusion environment. Fission reactors, because of their relatively soft neutron spectra, cannot produce the high ratio of transmutations to displacements (except in an important special case) or the high energy recoil atoms appropriate to fusion reactors utilizing the D-T reaction.

  18. 216-B-3 expansion ponds closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

  19. 216-B-3 expansion ponds closure plan

    International Nuclear Information System (INIS)

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA

  20. Scalable and practical multi-objective distribution network expansion planning

    NARCIS (Netherlands)

    Luong, N.H.; Grond, M.O.W.; Poutré, La J.A.; Bosman, P.A.N.

    2015-01-01

    We formulate the distribution network expansion planning (DNEP) problem as a multi-objective optimization (MOO) problem with different objectives that distribution network operators (DNOs) would typically like to consider during decision making processes for expanding their networks. Objectives are

  1. 1994 Panel 1 Utilization Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The Waste Isolation Pilot Plant (WIPP) is intended to receive, handle, and permanently dispose of transuranic (TRU) waste. To fulfill this mission, the U.S. Department of Energy (DOE) constructed a full-scale facility to demonstrate both technical and operational principles of the permanent isolation of TRU waste. The WIPP consists of surface and underground facilities. Panel 1 is situated in the underground facility horizon which is located approximately 2,150 feet below the surface in the predominantly halite Salado Formation. The Panel 1 Utilization Plan provides a strategy for the optimum use of Panel 1 which is consistent with the priorities established by the DOE to accomplish the WIPP mission. These priorities, which include maintaining personnel safety, conducting performance assessment, and continued operational enhancements, are the guiding premise for the decisions on the planned usage of the WIPP underground facility. The continuation of ongoing investigations along with the planned testing and training to be carried out in Panel 1 will enhance the current knowledge and understanding of the operational and geotechnical aspects of the panel configuration. This enhancement will ultimately lead to safer, more efficient, and more cost-effective methods of operation. Excavation of the waste storage area began in May 1986 with the mining of entries to Panel 1. The original design for the waste storage rooms at the WIPP provided a limited period of time during which to mine the openings and to emplace waste. Each panel, consisting of seven storage rooms, was scheduled to be mined and filled in less than 5 years. Panel 1 was developed to receive waste for a demonstration phase that was scheduled to start in October 1988. The demonstration phase was deferred, and the experimental test program was modified to use contact-handled (CH) transuranic waste in bin-scale tests, planned for Room 1, Panel 1

  2. Electric Grid Expansion Planning with High Levels of Variable Generation

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); You, Shutang [Univ. of Tennessee, Knoxville, TN (United States); Shankar, Mallikarjun [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Liu, Yilu [Univ. of Tennessee, Knoxville, TN (United States); Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-02-01

    Renewables are taking a large proportion of generation capacity in U.S. power grids. As their randomness has increasing influence on power system operation, it is necessary to consider their impact on system expansion planning. To this end, this project studies the generation and transmission expansion co-optimization problem of the US Eastern Interconnection (EI) power grid with a high wind power penetration rate. In this project, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. This study analyzed a time series creation method to capture the diversity of load and wind power across balancing regions in the EI system. The obtained time series can be easily introduced into the MIP co-optimization problem and then solved robustly through available MIP solvers. Simulation results show that the proposed time series generation method and the expansion co-optimization model and can improve the expansion result significantly after considering the diversity of wind and load across EI regions. The improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare. This study shows that modelling load and wind variations and diversities across balancing regions will produce significantly different expansion result compared with former studies. For example, if wind is modeled in more details (by increasing the number of wind output levels) so that more wind blocks are considered in expansion planning, transmission expansion will be larger and the expansion timing will be earlier. Regarding generation expansion, more wind scenarios will slightly reduce wind generation expansion in the EI system and increase the expansion of other generation such as gas. Also, adopting detailed wind scenarios will reveal that it may be uneconomic to expand transmission networks for transmitting a large amount of wind power through a long distance

  3. 2015 Plan. Project 1: methodology and planning process of the Brazilian electric sector expansion

    International Nuclear Information System (INIS)

    1993-10-01

    The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.)

  4. Advanced methodology for generation expansion planning including interconnected systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, M; Yokoyama, R; Yasuda, K [Tokyo Metropolitan Univ. (Japan); Sasaki, H [Hiroshima Univ. (Japan); Ogimoto, K [Electric Power Development Co. Ltd., Tokyo (Japan)

    1994-12-31

    This paper reviews advanced methodology for generation expansion planning including interconnected systems developed in Japan, putting focus on flexibility and efficiency in a practical application. First, criteria for evaluating flexibility of generation planning considering uncertainties are introduced. Secondly, the flexible generation mix problem is formulated as a multi-objective optimization with more than two objective functions. The multi-objective optimization problem is then transformed into a single objective problem by using the weighting method, to obtain the Pareto optimal solution, and solved by a dynamics programming technique. Thirdly, a new approach for electric generation expansion planning of interconnected systems is presented, based on the Benders Decomposition technique. That is, large scale generation problem constituted by the general economic load dispatch problem, and several sub problems which are composed of smaller scale isolated system generation expansion plans. Finally, the generation expansion plan solved by an artificial neural network is presented. In conclusion, the advantages and disadvantages of this method from the viewpoint of flexibility and applicability to practical generation expansion planning are presented. (author) 29 refs., 10 figs., 4 tabs.

  5. Multi-year expansion planning of large transmission networks

    Energy Technology Data Exchange (ETDEWEB)

    Binato, S; Oliveira, G C [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes a model for multi-year transmission network expansion to be used in long-term system planning. The network is represented by a linearized (DC) power flow and, for each year, operation costs are evaluated by a linear programming (LP) based algorithm that provides sensitivity indices for circuit reinforcements. A Backward/Forward approaches is proposed to devise an expansion plan over the study period. A case study with the southeastern Brazilian system is presented and discussed. (author) 18 refs., 5 figs., 1 tab.

  6. Generation Expansion Planning Considering Integrating Large-scale Wind Generation

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Østergaard, Jacob

    2013-01-01

    necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. A bi-level generation expansion planning approach considering large-scale wind generation was proposed in this paper. The first phase is investment decision, while the second phase is production...... optimization decision. A multi-objective PSO (MOPSO) algorithm was introduced to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of the proposed bi-level planning approach and the MOPSO...

  7. Generation capacity expansion planning in deregulated electricity markets

    Science.gov (United States)

    Sharma, Deepak

    With increasing demand of electric power in the context of deregulated electricity markets, a good strategic planning for the growth of the power system is critical for our tomorrow. There is a need to build new resources in the form of generation plants and transmission lines while considering the effects of these new resources on power system operations, market economics and the long-term dynamics of the economy. In deregulation, the exercise of generation planning has undergone a paradigm shift. The first stage of generation planning is now undertaken by the individual investors. These investors see investments in generation capacity as an increasing business opportunity because of the increasing market prices. Therefore, the main objective of such a planning exercise, carried out by individual investors, is typically that of long-term profit maximization. This thesis presents some modeling frameworks for generation capacity expansion planning applicable to independent investor firms in the context of power industry deregulation. These modeling frameworks include various technical and financing issues within the process of power system planning. The proposed modeling frameworks consider the long-term decision making process of investor firms, the discrete nature of generation capacity addition and incorporates transmission network modeling. Studies have been carried out to examine the impact of the optimal investment plans on transmission network loadings in the long-run by integrating the generation capacity expansion planning framework within a modified IEEE 30-bus transmission system network. The work assesses the importance of arriving at an optimal IRR at which the firm's profit maximization objective attains an extremum value. The mathematical model is further improved to incorporate binary variables while considering discrete unit sizes, and subsequently to include the detailed transmission network representation. The proposed models are novel in the

  8. Sensitivity analysis in electric system expansion planning study using DECADES

    International Nuclear Information System (INIS)

    Perez Martin, D.; Lopez Lopez, I.

    1998-01-01

    To cover the increasing electricity demand as a key economic and social factor of development, it is necessary to have adequate expansion police. The delay in installation of certain capabilities produces electricity deficit. In other hand, construction of oversized capacities generates excessive costs. Therefore it is important to acquire or develop adequate methodologies according to the country specific conditions to carry out electric expansion planning studies. The goal is to chose optimal solutions in order to reach sustainable development using owns energy resources and preserving the environment. In the paper the Decades methodology is used for electricity system expansion planning. Premises and main assumptions for the calculations are presented. Some electric system expansion cases are evaluated. We also present the results of a sensibility study varying the discount rate, loss of load probability energy not served cost, fuel availability and fuel and investment costs. The reliability criteria currently not used in Cuban electric system are evaluated. We discuss the results and display the conclusions and recommendations

  9. Transmission Network Expansion Planning Considering Phase-Shifter Transformers

    Directory of Open Access Journals (Sweden)

    Celso T. Miasaki

    2012-01-01

    Full Text Available This paper presents a novel mathematical model for the transmission network expansion planning problem. Main idea is to consider phase-shifter (PS transformers as a new element of the transmission system expansion together with other traditional components such as transmission lines and conventional transformers. In this way, PS are added in order to redistribute active power flows in the system and, consequently, to diminish the total investment costs due to new transmission lines. Proposed mathematical model presents the structure of a mixed-integer nonlinear programming (MINLP problem and is based on the standard DC model. In this paper, there is also applied a specialized genetic algorithm aimed at optimizing the allocation of candidate components in the network. Results obtained from computational simulations carried out with IEEE-24 bus system show an outstanding performance of the proposed methodology and model, indicating the technical viability of using these nonconventional devices during the planning process.

  10. DYNAMIC PROGRAMMING – EFFICIENT TOOL FOR POWER SYSTEM EXPANSION PLANNING

    Directory of Open Access Journals (Sweden)

    SIMO A.

    2015-03-01

    Full Text Available The paper isfocusing on dynamic programming use for power system expansion planning (EP – transmission network (TNEP and distribution network (DNEP. The EP problem has been approached from the retrospective and prospective point of view. To achieve this goal, the authors are developing two software-tools in Matlab environment. Two techniques have been tackled: particle swarm optimization (PSO and genetic algorithms (GA. The case study refers to Test 25 buses test power system developed within the Power Systems Department.

  11. Combined heuristic with fuzzy system to transmission system expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Silva Sousa, Aldir; Asada, Eduardo N. [University of Sao Paulo, Sao Carlos School of Engineering, Department of Electrical Engineering Av. Trabalhador Sao-carlense, 400, 13566-590 Sao Carlos, SP (Brazil)

    2011-01-15

    A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (author)

  12. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  13. A multi-stage stochastic transmission expansion planning method

    International Nuclear Information System (INIS)

    Akbari, Tohid; Rahimikian, Ashkan; Kazemi, Ahad

    2011-01-01

    Highlights: → We model a multi-stage stochastic transmission expansion planning problem. → We include available transfer capability (ATC) in our model. → Involving this criterion will increase the ATC between source and sink points. → Power system reliability will be increased and more money can be saved. - Abstract: This paper presents a multi-stage stochastic model for short-term transmission expansion planning considering the available transfer capability (ATC). The ATC can have a huge impact on the power market outcomes and the power system reliability. The transmission expansion planning (TEP) studies deal with many uncertainties, such as system load uncertainties that are considered in this paper. The Monte Carlo simulation method has been applied for generating different scenarios. A scenario reduction technique is used for reducing the number of scenarios. The objective is to minimize the sum of investment costs (IC) and the expected operation costs (OC). The solution technique is based on the benders decomposition algorithm. The N-1 contingency analysis is also done for the TEP problem. The proposed model is applied to the IEEE 24 bus reliability test system and the results are efficient and promising.

  14. Decenal plan of electric energy expansion - 2006-2015

    International Nuclear Information System (INIS)

    2006-01-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references

  15. Decenal plan of electric energy expansion - 2006-2015

    International Nuclear Information System (INIS)

    2005-01-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references

  16. Transmission network expansion planning based on hybridization model of neural networks and harmony search algorithm

    Directory of Open Access Journals (Sweden)

    Mohammad Taghi Ameli

    2012-01-01

    Full Text Available Transmission Network Expansion Planning (TNEP is a basic part of power network planning that determines where, when and how many new transmission lines should be added to the network. So, the TNEP is an optimization problem in which the expansion purposes are optimized. Artificial Intelligence (AI tools such as Genetic Algorithm (GA, Simulated Annealing (SA, Tabu Search (TS and Artificial Neural Networks (ANNs are methods used for solving the TNEP problem. Today, by using the hybridization models of AI tools, we can solve the TNEP problem for large-scale systems, which shows the effectiveness of utilizing such models. In this paper, a new approach to the hybridization model of Probabilistic Neural Networks (PNNs and Harmony Search Algorithm (HSA was used to solve the TNEP problem. Finally, by considering the uncertain role of the load based on a scenario technique, this proposed model was tested on the Garver’s 6-bus network.

  17. Light Duty Utility Arm Software Test Plan

    International Nuclear Information System (INIS)

    Kiebel, G.R.

    1995-01-01

    This plan describes how validation testing of the software will be implemented for the integrated control and data acquisition system of the Light Duty Utility Arm System (LDUA). The purpose of LDUA software validation testing is to demonstrate and document that the LDUA software meets its software requirements specification

  18. Light duty utility arm startup plan

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1998-01-01

    This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO)

  19. Energy efficiency resource modeling in generation expansion planning

    International Nuclear Information System (INIS)

    Ghaderi, A.; Parsa Moghaddam, M.; Sheikh-El-Eslami, M.K.

    2014-01-01

    Energy efficiency plays an important role in mitigating energy security risks and emission problems. In this paper, energy efficiency resources are modeled as efficiency power plants (EPP) to evaluate their impacts on generation expansion planning (GEP). The supply curve of EPP is proposed using the production function of electricity consumption. A decision making framework is also presented to include EPP in GEP problem from an investor's point of view. The revenue of EPP investor is obtained from energy cost reduction of consumers and does not earn any income from electricity market. In each stage of GEP, a bi-level model for operation problem is suggested: the upper-level represents profit maximization of EPP investor and the lower-level corresponds to maximize the social welfare. To solve the bi-level problem, a fixed-point iteration algorithm is used known as diagonalization method. Energy efficiency feed-in tariff is investigated as a regulatory support scheme to encourage the investor. Results pertaining to a case study are simulated and discussed. - Highlights: • An economic model for energy efficiency programs is presented. • A framework is provided to model energy efficiency resources in GEP problem. • FIT is investigated as a regulatory support scheme to encourage the EPP investor. • The capacity expansion is delayed and reduced with considering EPP in GEP. • FIT-II can more effectively increase the energy saving compared to FIT-I

  20. Impact of Operating Rules on Planning Capacity Expansion of Urban Water Supply Systems

    Science.gov (United States)

    de Neufville, R.; Galelli, S.; Tian, X.

    2017-12-01

    This study addresses the impact of operating rules on capacity planning of urban water supply systems. The continuous growth of metropolitan areas represents a major challenge for water utilities, which often rely on industrial water supply (e.g., desalination, reclaimed water) to complement natural resources (e.g., reservoirs). These additional sources increase the reliability of supply, equipping operators with additional means to hedge against droughts. How do their rules for using industrial water supply impact the performance of water supply system? How might it affect long-term plans for capacity expansion? Possibly significantly, as demonstrated by the analysis of the operations and planning of a water supply system inspired by Singapore. Our analysis explores the system dynamics under multiple inflow and management scenarios to understand the extent to which alternative operating rules for the use of industrial water supply affect system performance. Results first show that these operating rules can have significant impact on the variability in system performance (e.g., reliability, energy use) comparable to that of hydro-climatological conditions. Further analyses of several capacity expansion exercises—based on our original hydrological and management scenarios—show that operating rules significantly affect the timing and magnitude of critical decisions, such as the construction of new desalination plants. These results have two implications: Capacity expansion analysis should consider the effect of a priori uncertainty about operating rules; and operators should consider how their flexibility in operating rules can affect their perceived need for capacity.

  1. Load Forecasting in Electric Utility Integrated Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sanstad, Alan H [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-19

    Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

  2. Generation Expansion Planning as Particle Swarm Optimization with Gridified SATyrus

    International Nuclear Information System (INIS)

    Diacovo, R.; Franca, F. M. G.; Lima, P. M. V.

    2007-01-01

    This work introduces our first attempt on using the Grid to solve a real-life problem with the SATyrus platform. In electrical engineering, a challenging task is to find the less expensive ways to expand the energy production capacity, supporting an increasing demand. This is the definition of the generation expansion planning problem (GEP). We decided to investigate the Particle Swarm Optimization (PSO) paradigm for this task, due to its efficiency and arbitrary memory requirements, the last one being a desirable characteristic for any solver running on a Grid environment. The PSO was used in conjunction with the SATyrus platform, which stands for an energy function synthesizer. We hope the results presented here will help to evolve SATyrus into a reliable generic problem solver. (Author)

  3. Market-based transmission expansion planning by improved differential evolution

    International Nuclear Information System (INIS)

    Georgilakis, Pavlos S.

    2010-01-01

    The restructuring and deregulation has exposed the transmission planner to new objectives and uncertainties. As a result, new criteria and approaches are needed for transmission expansion planning (TEP) in deregulated electricity markets. This paper proposes a new market-based approach for TEP. An improved differential evolution (IDE) model is proposed for the solution of this new market-based TEP problem. The modifications of IDE in comparison to the simple differential evolution method are: (1) the scaling factor F is varied randomly within some range, (2) an auxiliary set is employed to enhance the diversity of the population, (3) the newly generated trial vector is compared with the nearest parent, and (4) the simple feasibility rule is used to treat the constraints. Results from the application of the proposed method on the IEEE 30-bus test system demonstrate the feasibility and practicality of the proposed IDE for the solution of TEP problem. (author)

  4. 24 CFR 599.507 - Tax incentives utilization plan.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Tax incentives utilization plan....507 Tax incentives utilization plan. (a) Preliminary plan. Within six months of designation, the CoRA must prepare and submit to HUD a preliminary tax incentives utilization plan for achieving the State...

  5. Planning manual for utility application of WECS

    Energy Technology Data Exchange (ETDEWEB)

    Park, G.L. (ed.)

    1979-06-01

    A two-part approach for evaluating the feasibility of wind electric conversion systems (WECS) for utility application is presented and explained. Assessment of wind energy potential, sites, interconnection, and capital and production costing is included. The first part is a brief preliminary procedure used to determine whether the expense and effort of a detailed investigation is justified. The preliminary procedure requires assumptions which limit its accuracy. If the result indicates that WECS have probable potential for a specific utility application, then a set of modifications to detailed conventional planning procedures is developed. The modifications include discussion of wind velocity estimation and effects of site features on wind velocity, institutional problems, siting, choosing generation cases with WECS, reliability considerations, production costing, and operating problems. Appendices include an annotated bibliography, wind measurement methods, procedure for estimating WECS capacity factor, and a method for generating correlated wind velocity samples for use in production cost programs.

  6. Utilization and determinants of modern family planning among ...

    African Journals Online (AJOL)

    kim

    planning increases with women's education, and creating a conductive environment for ... Key words: Family planning, Modern methods, Utilization, Reproductive age, Partner discussion .... Traditional methods consist of periodic abstinence,.

  7. A computational model for determining the minimal cost expansion alternatives in transmission systems planning

    International Nuclear Information System (INIS)

    Pinto, L.M.V.G.; Pereira, M.V.F.; Nunes, A.

    1989-01-01

    A computational model for determining an economical transmission expansion plan, based in the decomposition techniques is presented. The algorithm was used in the Brazilian South System and was able to find an optimal solution, with a low computational resource. Some expansions of this methodology are been investigated: the probabilistic one and the expansion with financier restriction. (C.G.C.). 4 refs, 7 figs

  8. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mill, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarrett [Independent Consultant

    2016-08-19

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being

  9. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Barbose, Galen L.; Seel, Joachim; Dong, Changgui; Mai, Trieu; Sigrin, Ben; Zuboy, Jarett

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  10. Cost estimation of sumatra electricity expansion planning with nuclear option

    International Nuclear Information System (INIS)

    Edwaren Liun

    2008-01-01

    The objective of the study is to obtain the cost analysis on optimum solution of Sumatra electricity system using WASP-IV Program. Considering the economic aspect, nuclear power plant (NPP) is feasible in the future. From the geographical aspect Sumatra is prospecting for NPP site, especially the east coastal area due to the absence of hydro power potential and geothermal field. The use of petroleum as fuel in large scale power plants is not feasible. Beside causing high cost for electricity sector, it is also an important fuel for any other sectors such as transportation, electrification of isolated areas. Gas fuelled power plants is still feasible for next several decades in limited capacity. The study presents three scenarios, i.e. Low Scenario, Base Scenario and High Scenario applying discount rate of 8%, 10% and 12% respectively. Cost estimation for Sumatra System Expansion Planning is 57 465 million US$ on the Base Scenario - discount rate 8%, 59 349 million US$ on the Base Scenario - discount rate 10%, and 57 796 million US$ on the Base Scenario - discount rate 12%. The objective function is 15 172 US$ on the Base Scenario - discount rate 8%, 12 663 million US$ on the Base Scenario - discount rate 10%, and 11 017 million US$ on the Base Scenario - discount rate 12%. (author)

  11. A new evolutionary solution method for dynamic expansion planning of DG-integrated primary distribution networks

    International Nuclear Information System (INIS)

    Ahmadigorji, Masoud; Amjady, Nima

    2014-01-01

    Highlights: • A new dynamic distribution network expansion planning model is presented. • A Binary Enhanced Particle Swarm Optimization (BEPSO) algorithm is proposed. • A Modified Differential Evolution (MDE) algorithm is proposed. • A new bi-level optimization approach composed of BEPSO and MDE is presented. • The effectiveness of the proposed optimization approach is extensively illustrated. - Abstract: Reconstruction in the power system and appearing of new technologies for generation capacity of electrical energy has led to significant innovation in Distribution Network Expansion Planning (DNEP). Distributed Generation (DG) includes the application of small/medium generation units located in power distribution networks and/or near the load centers. Appropriate utilization of DG can affect the various technical and operational indices of the distribution network such as the feeder loading, energy losses and voltage profile. In addition, application of DG in proper size is an essential tool to achieve the DG maximum potential benefits. In this paper, a time-based (dynamic) model for DNEP is proposed to determine the optimal size, location and installation year of DG in distribution system. Also, in this model, the Optimal Power Flow (OPF) is exerted to determine the optimal generation of DGs for every potential solution in order to minimize the investment and operation costs following the load growth in a specified planning period. Besides, the reinforcement requirements of existing distribution feeders are considered, simultaneously. The proposed optimization problem is solved by the combination of evolutionary methods of a new Binary Enhanced Particle Swarm Optimization (BEPSO) and Modified Differential Evolution (MDE) to find the optimal expansion strategy and solve OPF, respectively. The proposed planning approach is applied to two typical primary distribution networks and compared with several other methods. These comparisons illustrate the

  12. Expansion planning of brazilian electric sector: institutional changes, new policies and new instruments for planning

    International Nuclear Information System (INIS)

    Bajay, S.V.; Silva, W.A. da; Ricciulli, D.L.S.

    1990-01-01

    The Brazilian power supply industry has been in crisis for many years, particularly due to financial and institutional problems. There are many reasons for that, several of them from outside the industry. In this paper a diagnosis of the main elements of this crisis is worked out, in the context of the industry's expansion planning. Following, institutional changes, new policies and new instruments are proposed for this planning. The institutional setting, the demand studies, the demand side management, the supply optimisation, the rural electrification, the decentralized generation of electricity, the tariff structure, the ways of financing the industry, the technological advances, the social and environmental impacts and the integrated planning of the industry are discussed, together with the planning of the power supply industry interactions with the other energy supply industries and the rest of the economy. (author)

  13. Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barrows, Clayton [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lopez, Anthony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hale, Elaine [National Renewable Energy Lab. (NREL), Golden, CO (United States); Dyson, Mark [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eurek, Kelly [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-04-01

    In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations — particularly those related to capacity credit, dispatch modeling, and transmission modeling — to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

  14. Stochastic-based resource expansion planning for a grid-connected microgrid using interval linear programming

    International Nuclear Information System (INIS)

    Shaban Boloukat, Mohammad Hadi; Akbari Foroud, Asghar

    2016-01-01

    This paper represents a stochastic approach for long-term optimal resource expansion planning of a grid-connected microgrid (MG) containing different technologies as intermittent renewable energy resources, energy storage systems and thermal resources. Maximizing profit and reliability, along with minimizing investment and operation costs, are major objectives which have been considered in this model. Also, the impacts of intermittency and uncertainty in renewable energy resources were investigated. The interval linear programming (ILP) was applied for modelling inherent stochastic nature of the renewable energy resources. ILP presents some superiority in modelling of uncertainties in MG planning. The problem was formulated as a mixed-integer linear programming. It has been demonstrated previously that the benders decomposition (BD) served as an effective tool for solving such problems. BD divides the original problem into a master (investment) problem and operation and reliability subproblems. In this paper a multiperiod MG planning is presented, considering life time, maximum penetration limit of each technology, interest rate, capital recovery factor and investment fund. Real-time energy exchange with the utility is covered, with a consideration of variable tariffs at different load blocks. The presented approach can help MG planners to adopt best decision under various uncertainty levels based on their budgetary policies. - Highlights: • Considering uncertain nature of the renewable resources with applying ILP. • Considering the effect of intermittency of renewable in MG planning. • Multiobjective MG planning problem which covers cost, profit and reliability. • Multiperiod approach for MG planning considering life time and MPL of technologies. • Presenting real-time energy exchange with the utility considering variable tariffs.

  15. Banking towards development: Evidence from the Spanish banking expansion plan

    OpenAIRE

    Pere Arqué-Castells; Elisabet Viladecans-Marsal

    2013-01-01

    During the period 1965-1987 Spain was an emerging market in full transition from developing to developed status. During the same period the Spanish banking system underwent an unprecedented episode of expansion growing from 5,000 to over 30,000 bank branches. We examine whether the latter process partly caused the former by focusing on the relationship between branch expansion and entrepreneurship in the wholesale and retail trade industries. To address the non-random allocation of bank branc...

  16. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  17. Barriers to utilization of modern methods of family planning amongst ...

    African Journals Online (AJOL)

    Barriers to utilization of modern methods of family planning amongst women in a ... is recognized by the world health organization (WHO) as a universal human right. ... Conclusion: The study finds numerous barriers to utilization of family ...

  18. Light duty utility arm startup plan

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1998-01-01

    This Startup Plan encompasses activities necessary to perform startup and operation of the LDUA in Facility Group 3 tanks and complete turnover to CPO. The activities discussed in this plan will occur prior to, and following the US Department Energy, Richland Operations Office Operational Readiness Review. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this startup plan need not be Unresolved Safety Question (USQ) screened

  19. Multi-objective and multi-criteria optimization for power generation expansion planning with CO2 mitigation in Thailand

    Directory of Open Access Journals (Sweden)

    Kamphol Promjiraprawat

    2013-06-01

    Full Text Available In power generation expansion planning, electric utilities have encountered the major challenge of environmental awareness whilst being concerned with budgetary burdens. The approach for selecting generating technologies should depend on economic and environmental constraint as well as externalities. Thus, the multi-objective optimization becomes a more attractive approach. This paper presents a hybrid framework of multi-objective optimization and multi-criteria decision making to solve power generation expansion planning problems in Thailand. In this paper, CO2 emissions and external cost are modeled as a multi-objective optimization problem. Then the analytic hierarchy process is utilized to determine thecompromised solution. For carbon capture and storage technology, CO2 emissions can be mitigated by 74.7% from the least cost plan and leads to the reduction of the external cost of around 500 billion US dollars over the planning horizon. Results indicate that the proposed approach provides optimum cost-related CO2 mitigation plan as well as external cost.

  20. Multi criteria analysis for the long term planning of the mexican electrical system expansion - 337

    International Nuclear Information System (INIS)

    Martin-del-Campo, C.; Guadarrama, R.; Francois, J.L.

    2010-01-01

    A multi-criteria analysis was applied to the long term electricity expansion planning for Mexico for the 2008-2030 period. This methodology is based on a fuzzy logic inference system, which allows for the definition of a decision function that takes into account all the evaluation parameters. This function permits one to rank the alternative expansion plans in order to determine the most attractive option. In this study four evaluation parameters were considered: (a) the total generating cost obtained from an optimization expansion using the WASP-IV model, (b) the economic risk associated with fuel prices increases, (c) the diversity of technologies in the mix, and (d) the external costs. The analysis was applied to a base case and to three additional expansion cases, which are very similar to the base case, but each of them excludes the addition of a certain type of candidate technology in the optimization planning. The base case is Plan A which has six candidate technologies available for the optimization planning. Plan B excludes coal; Plan C excludes oil, and Plan D excludes nuclear energy. After the decision analysis was made it was found that Plan B is best followed by Plan A, then Plan C and finally Plan D. The worst plan expansion was obtained when the nuclear candidate was excluded in the program of additions during the time period. The primary conclusion is that nuclear energy must participate in the mix of electricity generation. This result can be used to define the energy policy for electricity production in Mexico in the medium-long term scenario. (authors)

  1. Transmission investment and expansion planning in a restructured electricity market

    International Nuclear Information System (INIS)

    Wu, F.F; Wen, F.S.; Zheng, F.L.

    2006-01-01

    Transmission planning in a restructured electricity market becomes increasingly complicated. To bridge the gap between economic and engineering considerations, this survey paper suggests a framework to clarify the interactions among various economic and engineering issues by reviewing recent theoretical and practical progress in transmission investment and transmission planning methodology. Thus, the paper makes economic literature more accessible to the engineering community and engineering literature more accessible to the economic community interested in the subject. (author)

  2. Treatment of Solar Generation in Electric Utility Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  3. Powering the people: India's capacity expansion plans

    Energy Technology Data Exchange (ETDEWEB)

    Patel, S.

    2009-05-15

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  4. Grid Transmission Expansion Planning Model Based on Grid Vulnerability

    Science.gov (United States)

    Tang, Quan; Wang, Xi; Li, Ting; Zhang, Quanming; Zhang, Hongli; Li, Huaqiang

    2018-03-01

    Based on grid vulnerability and uniformity theory, proposed global network structure and state vulnerability factor model used to measure different grid models. established a multi-objective power grid planning model which considering the global power network vulnerability, economy and grid security constraint. Using improved chaos crossover and mutation genetic algorithm to optimize the optimal plan. For the problem of multi-objective optimization, dimension is not uniform, the weight is not easy given. Using principal component analysis (PCA) method to comprehensive assessment of the population every generation, make the results more objective and credible assessment. the feasibility and effectiveness of the proposed model are validated by simulation results of Garver-6 bus system and Garver-18 bus.

  5. Pipelines, utilities plan over 150 scada systems

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that North American pipelines and utilities will spend more than $170 million on new or upgraded supervisory control and data acquisition (scada) systems during the 30-month period that commenced Sept. 1. Another $12.5 million will be spent on peripherals and consulting. Among the 699 various projects to be implemented during the period, companies will install 151 scada systems, add 154 remote-terminal units (RTUs) to existing scada units, and install 196 communications systems. Scada systems are computerized hardware and software systems that perform a set of monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  6. Leader-Follower Approach to Gas-Electricity Expansion Planning Problem

    DEFF Research Database (Denmark)

    Khaligh, Vahid; Oloomi Buygi, Majid; Anvari-Moghaddam, Amjad

    2018-01-01

    investment in capacity addition to the generation and transmission levels while considers the limitations on fuel consumption. On the other hand gas operator decides about investment in gas pipelines expansions considering the demanded gas by the electricity network. In this planning model for a joint gas......The main purpose of this paper is to develop a method for sequential gas and electricity networks expansion planning problem. A leader-follower approach performs the expansion planning of the joint gas and electricity networks. Electric system operator under adequacy incentive decides about......-electricity network, supply and demand are matched together while adequacy of fuel for gas consuming units is also guaranteed. To illustrate the effectiveness of the proposed method Khorasan province of Iran is considered as a case study which has a high penetration level of gas-fired power plants (GFPP). Also...

  7. Studying influence of two effective parameters on network losses in transmission expansion planning using DCGA

    International Nuclear Information System (INIS)

    Shayeghi, H.; Jalilzadeh, S.; Mahdavi, M.; Hadadian, H.

    2008-01-01

    Transmission network expansion planning (TNEP) is a basic part of power network planning that determines where, when and how many new transmission lines should be added to the network. Its task is to minimize the network construction and operational cost, while meeting imposed technical, economic and reliability constraints. Up till now, various methods have been proposed for solution of the static transmission network expansion planning (STNEP) problem. But, in all of them, the effect of two important parameters i.e., inflation rate and load growth factor on network losses has not been investigated. Thus, in this paper, STNEP is being studied considering the effect of inflation rate and load growth factor on the network losses in a transmission network with different voltage levels using a decimal codification genetic algorithm (DCGA). The effectiveness of the proposed idea is tested on the Garver's six-bus network. The results evaluation reveals that the inflation rate and load growth factor have important effect on the network losses and subsequent network arrangement. In addition, considering the effect of two above-mentioned parameters (inflation rate and load growth factor) in expansion planning of transmission networks with various line voltage levels is caused that the total expansion cost of the network (expansion costs and the operational cost) is calculated more exactly and therefore the network satisfies the requirements of delivering electric power more safely and reliably to load centers

  8. Planning of the energy generation system expansion taking into account transmission lines; Planejamento da expansao do sistema de geracao considerando redes de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Lucio, Joao Carlos Martins

    1990-12-31

    This work presents the proposal of a methodology which, by exploring the interaction between generation and transmission systems expansion studies, aims for an Integrated Planning of Power Systems. It intends to emphasize the Integrated Planning importance so as to improve the utilization of the available resources in the electric sector and to reduce the expansion and operational costs. The work describes a procedure to consider explicitly the network for the determination of a generation system construction schedule. It considers that the transmission lines construction costs have a significant weight so that it can modify the initial generation expansion plan with the anticipation of some investments and the postponement of others, decreasing the global expansion costs. The generation and transmission systems expansion is made in an optimal way using a Graph Search Algorithm. Finally the best Integrated Plan is obtained from a final algorithm that generates a sequence of integrated plans from combination of generation and transmission algorithms. These plans are compared from a global cost point of view until a convergence criterion has been satisfied. (author) 18 refs., 5 figs., 28 tabs.

  9. Planning of the energy generation system expansion taking into account transmission lines; Planejamento da expansao do sistema de geracao considerando redes de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Lucio, Joao Carlos Martins

    1991-12-31

    This work presents the proposal of a methodology which, by exploring the interaction between generation and transmission systems expansion studies, aims for an Integrated Planning of Power Systems. It intends to emphasize the Integrated Planning importance so as to improve the utilization of the available resources in the electric sector and to reduce the expansion and operational costs. The work describes a procedure to consider explicitly the network for the determination of a generation system construction schedule. It considers that the transmission lines construction costs have a significant weight so that it can modify the initial generation expansion plan with the anticipation of some investments and the postponement of others, decreasing the global expansion costs. The generation and transmission systems expansion is made in an optimal way using a Graph Search Algorithm. Finally the best Integrated Plan is obtained from a final algorithm that generates a sequence of integrated plans from combination of generation and transmission algorithms. These plans are compared from a global cost point of view until a convergence criterion has been satisfied. (author) 18 refs., 5 figs., 28 tabs.

  10. OPEC production: Capital limitations, environmental movements may interfere with expansion plans

    International Nuclear Information System (INIS)

    Ismail, I.A.H.

    1994-01-01

    Obtaining capital is a critical element in the production expansion plans of OPEC member countries. Another issue that may impact the plans is the environmental taxes that may reduce the call on OPEC oil by 5 million b/d in 2000 and about 16 million b/d in the year 2010. This concluding part of a two-part series discusses the expansion possibilities of non-Middle East OPEC members, OPEC's capital requirements, and environmental concerns. Non-Middle East OPEC includes Algeria, Gabon, Indonesia, Libya, Nigeria, and Venezuela

  11. Awareness and Utilization of Family Planning Methods among ...

    African Journals Online (AJOL)

    deficiency Virus (HIV) infection influence the design and background Family planning is an important preventive measure against maternal and child morbidity and mortality. This study was aimed at determining the awareness and utilization of family ...

  12. The utility of theory of planned behavior in predicting consistent ...

    African Journals Online (AJOL)

    admin

    disease. Objective: To examine the utility of theory of planned behavior in predicting consistent condom use intention of HIV .... (24-25), making subjective norms as better predictors of intention ..... Organizational Behavior and Human Decision.

  13. State Medicaid Expansions for Parents Led to Increased Coverage and Prenatal Care Utilization among Pregnant Mothers.

    Science.gov (United States)

    Wherry, Laura R

    2017-12-28

    To evaluate impacts of state Medicaid expansions for low-income parents on the health insurance coverage, pregnancy intention, and use of prenatal care among mothers who became pregnant. Person-level data for women with a live birth from the 1997-2012 Pregnancy Risk Assessment Monitoring System. The sample was restricted to women who were already parents using information on previous live births and combined with information on state Medicaid policies for low-income parents. I used a measure of expanded generosity of state Medicaid eligibility for low-income parents to estimate changes in health insurance, pregnancy intention, and prenatal care for pregnant mothers associated with Medicaid expansion. I found an increase in prepregnancy health insurance coverage and coverage during pregnancy among pregnant mothers, as well as earlier initiation of prenatal care, associated with the expansions. Among pregnant mothers with less education, I found an increase in the adequacy of prenatal care utilization. Expanded Medicaid coverage for low-income adults has the potential to increase a woman's health insurance coverage prior to pregnancy, as well as her insurance coverage and medical care receipt during pregnancy. © Health Research and Educational Trust.

  14. Integrated Transport Planning Framework Involving Combined Utility Regret Approach

    DEFF Research Database (Denmark)

    Wang, Yang; Monzon, Andres; Di Ciommo, Floridea

    2014-01-01

    Sustainable transport planning requires an integrated approach involving strategic planning, impact analysis, and multicriteria evaluation. This study aimed at relaxing the utility-based decision-making assumption by newly embedding anticipated-regret and combined utility regret decision mechanisms...... in a framework for integrated transport planning. The framework consisted of a two-round Delphi survey, integrated land use and transport model for Madrid, and multicriteria analysis. Results show that (a) the regret-based ranking has a similar mean but larger variance than the utility-based ranking does, (b......) the least-regret scenario forms a compromise between the desired and the expected scenarios, (c) the least-regret scenario can lead to higher user benefits in the short term and lower user benefits in the long term, (d) the utility-based, the regret-based, and the combined utility- and regret...

  15. Analysis of the security during power system expansion planning

    Directory of Open Access Journals (Sweden)

    Osak Alexey

    2017-01-01

    Full Text Available Increasing the intelligent level of the EPS control systems, caused by the implementation of Smart technologies, changes the structure and the properties of EPS and increases the importance of system reliability analysis. System reliability analysis includes two components – for the balance and for the regime. On the one hand, there is a large number of studies to assess the reliability of the power system, which examines various aspects and methods of solving this problem. On the other hand, in Russia there is no generally accepted methodology with clear criteria that could be used for feasibility studies of various technical solutions taking into consideration system reliability aspects. In practice, the security analysis is limited by the calculations of power flows, static and dynamic stability for a number of forecast periods for the normal and repair circuits considering the most severe disturbances. The existing approach allows defining the requirements and adjusting emergency control systems, but does not allow evaluating and comparing solutions for power grid constructions. The authors propose a new method for power system reliability evaluation, which is suitable for planning development and operation of power systems. The method includes a general description of the algorithm which allows to compare various development scenarios, as well as to assess the reliability level of their implementation. In particular, the method allows to determine where it is needed only the relay protection and emergency control system development, and where it is necessary grid, protection and control development and reconstruction.

  16. Effect of economic parameters on power generation expansion planning

    International Nuclear Information System (INIS)

    Sevilgen, Sueleyman Hakan; Hueseyin Erdem, Hasan; Cetin, Burhanettin; Volkan Akkaya, Ali; Dagdas, Ahmet

    2005-01-01

    The increasing consumption of electricity within time forces countries to build additional power plants. Because of technical and economic differences of the additional power plants, economic methodologies are used to determine the best technology for the additional capacity. The annual levelized cost method is used for this purpose, and the technology giving the minimum value for the additional load range is chosen. However, the economic parameters such as interest rate, construction escalation, fuel escalation, maintenance escalation and discount factor can affect the annual levelized cost considerably and change the economic range of the plants. Determining the values of the economical parameters in the future is very difficult, especially in developing countries. For this reason, the analysis of the changing rates of the mentioned values is of great importance for the planners of the additional capacity. In this study, the changing rates of the economic parameters that influence the annual levelized cost of the alternative power plant types are discussed. The alternative power plants considered for the electricity generation sector of Turkey and the economic parameters dominating each plant type are determined. It is clearly seen that the annual levelized cost for additional power plants varies with the economic parameters. The results show that the economic parameters variation has to be taken into consideration in electricity generation planning

  17. Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation

    Energy Technology Data Exchange (ETDEWEB)

    Tekiner, Hatice [Industrial Engineering, College of Engineering and Natural Sciences, Istanbul Sehir University, 2 Ahmet Bayman Rd, Istanbul (Turkey); Coit, David W. [Department of Industrial and Systems Engineering, Rutgers University, 96 Frelinghuysen Rd., Piscataway, NJ (United States); Felder, Frank A. [Edward J. Bloustein School of Planning and Public Policy, Rutgers University, Piscataway, NJ (United States)

    2010-12-15

    A new approach to the electricity generation expansion problem is proposed to minimize simultaneously multiple objectives, such as cost and air emissions, including CO{sub 2} and NO{sub x}, over a long term planning horizon. In this problem, system expansion decisions are made to select the type of power generation, such as coal, nuclear, wind, etc., where the new generation asset should be located, and at which time period expansion should take place. We are able to find a Pareto front for the multi-objective generation expansion planning problem that explicitly considers availability of the system components over the planning horizon and operational dispatching decisions. Monte-Carlo simulation is used to generate numerous scenarios based on the component availabilities and anticipated demand for energy. The problem is then formulated as a mixed integer linear program, and optimal solutions are found based on the simulated scenarios with a combined objective function considering the multiple problem objectives. The different objectives are combined using dimensionless weights and a Pareto front can be determined by varying these weights. The mathematical model is demonstrated on an example problem with interesting results indicating how expansion decisions vary depending on whether minimizing cost or minimizing greenhouse gas emissions or pollutants is given higher priority. (author)

  18. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  19. Generation expansion planning of the electrical power system in West Java

    International Nuclear Information System (INIS)

    Nengah Sudja.

    1975-01-01

    A thorough study on the generation expansion planning of the electrical power system, covering mathematical and computerized calculations, and financial analysis on the daily load, the load duration, and the assumption of future load, supporting the idea for building nuclear power plants in Indonesia, is presented. (RUW)

  20. Techno-economic and environmental analysis of power generation expansion plan of Ghana

    International Nuclear Information System (INIS)

    Awopone, Albert K.; Zobaa, Ahmed F.; Banuenumah, Walter

    2017-01-01

    This paper examines the current electrical generation expansion plan of Ghana and compares it with proposed expansion pathways with higher penetration of Renewable Energy Technologies. An adaptation of Schwartz's Scenario Methodology was used to develop the scenarios which were then analysed using the Long-range Alternatives Planning (LEAP) model. Each of the scenarios represents policy options for generation expansion in Ghana up to 2040. Energy, economic and environmental analysis of the three alternative scenarios compared to the base scenarios was undertaken. Sensitivity results show that, if the country were to follow the generation expansion path described in the renewable energy scenarios, it could reap economic benefits of 0.5–13.23% depending on the developments in fuel prices and renewable technology capital cost. The analysis further quantifies benefits to be derived from a reduction in Greenhouse gases of the scenarios. Policy implications for the generation system of Ghana based on the results are also discussed. - Highlights: • LEAP demand projection for Ghana from 2010 to 2014. • Develop scenarios using an adaptation of Schwartz’s scenario approach. • Develop LEAP model for generation scenario. • Each scenario represents possible generation expansion strategy. • High renewable energy systems penetration results in net economic and environmental benefits.

  1. Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing

    OpenAIRE

    Kimms, Alf

    1996-01-01

    This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.

  2. The Effect of Medicaid Expansion on Utilization in Maryland Emergency Departments.

    Science.gov (United States)

    Klein, Eili Y; Levin, Scott; Toerper, Matthew F; Makowsky, Michael D; Xu, Tim; Cole, Gai; Kelen, Gabor D

    2017-11-01

    A proposed benefit of expanding Medicaid eligibility under the Patient Protection and Affordable Care Act (ACA) was a reduction in emergency department (ED) utilization for primary care needs. Pre-ACA studies found that new Medicaid enrollees increased their ED utilization rates, but the effect on system-level ED visits was less clear. Our objective was to estimate the effect of Medicaid expansion on aggregate and individual-based ED utilization patterns within Maryland. We performed a retrospective cross-sectional study of ED utilization patterns across Maryland, using data from Maryland's Health Services Cost Review Commission. We also analyzed utilization differences between pre-ACA (July 2012 to December 2013) uninsured patients who returned post-ACA (July 2014 to December 2015). The total number of ED visits in Maryland decreased by 36,531 (-1.2%) between the 6 quarters pre-ACA and the 6 quarters post-ACA. Medicaid-covered ED visits increased from 23.3% to 28.9% (159,004 additional visits), whereas uninsured patient visits decreased from 16.3% to 10.4% (181,607 fewer visits). Coverage by other insurance types remained largely stable between periods. We found no significant relationship between Medicaid expansion and changes in ED volume by hospital. For patients uninsured pre-ACA who returned post-ACA, the adjusted visits per person during 6 quarters was 2.38 (95% confidence interval 2.35 to 2.40) for those newly enrolled in Medicaid post-ACA compared with 1.66 (95% confidence interval 1.64 to 1.68) for those remaining uninsured. There was a substantial increase in patients covered by Medicaid in the post-ACA period, but this did not significantly affect total ED volume. Returning patients newly enrolled in Medicaid visited the ED more than their uninsured counterparts; however, this cohort accounted for only a small percentage of total ED visits in Maryland. Copyright © 2017 American College of Emergency Physicians. Published by Elsevier Inc. All rights

  3. Three-dimensional photogrammetry for surgical planning of tissue expansion in hemifacial microsomia.

    Science.gov (United States)

    Jayaratne, Yasas S N; Lo, John; Zwahlen, Roger A; Cheung, Lim K

    2010-12-01

    We aim to illustrate the applications of 3-dimensional (3-D) photogrammetry for surgical planning and longitudinal assessment of the volumetric changes in hemifacial microsomia. A 3-D photogrammetric system was employed for planning soft tissue expansion and transplantation of a vascularized scapular flap for a patient with hemifacial microsomia. The facial deficiency was calculated by superimposing a mirror of the normal side on the preoperative image. Postsurgical volumetric changes were monitored by serial superimposition of 3-D images. A total of 31 cm(3) of tissue expansion was achieved within a period of 4 weeks. A scapular free flap measuring 8 cm × 5 cm was transplanted to augment the facial deficiency. Postsurgical shrinkage of the flap was observed mainly in the first 3 months and it was minimal thereafter. 3-D photogrammetry can be used as a noninvasive objective tool for assessing facial deformity, planning, and postoperative follow-up of surgical correction of facial asymmetry.

  4. Technical and economic evaluation of voltage level in transmission network expansion planning using GA

    International Nuclear Information System (INIS)

    Jalilzadeh, S.; Kazemi, A.; Shayeghi, H.; Madavi, M.

    2008-01-01

    Transmission network expansion planning is an important part of power system planning. Its task is to determine an optimal network configuration according to load growth. It determines where, when and how many new transmission lines should be installed. Up to now, various methods have been presented to solve the static transmission network expansion planning (STNEP) problem, but in all of these methods, the STNEP problem has been solved regardless of voltage level of the lines. In this paper, due to different voltage levels in the transmission network, which cause different annual losses, STNEP has been studied considering the voltage level of the transmission lines and the network loss using the genetic algorithm (GA). Finally, the proposed idea has been examined on Garvers 6 bus network. The results show that considering the loss in a network with different voltage levels decreases the operational costs considerably, and the network satisfies the requirement of delivering electric power more safely and reliably to load centers

  5. Predictors of needle exchange program utilization during its implementation and expansion in Tijuana, Mexico.

    Science.gov (United States)

    Smith, Danielle M; Werb, Dan; Abramovitz, Daniela; Magis-Rodriguez, Carlos; Vera, Alicia; Patterson, Thomas L; Strathdee, Steffanie A

    2016-03-01

    Until the early 2000s, there was only one needle exchange program (NEP) offered in Mexico. In 2004, the second Mexican NEP opened in Tijuana, but its utilization has not been studied. We studied predictors of initiating NEP during its early expansion in Tijuana, Mexico. From April 2006 to April 2007, people who inject drugs (PWID) residing in Tijuana who had injected within the last month were recruited using respondent-driven sampling. Weighted Poisson regression incorporating generalized estimating equations was used to identify predictors of initiating NEP, while accounting for correlation between recruiter and recruits. NEP uptake increased from 20% at baseline to 59% after 6 months. Among a subsample of PWID not accessing NEP at baseline (n = 480), 83% were male and median age was 37 years (Interquartile Range: 32-43). At baseline, 4.4% were HIV-infected and 5.9% had syphilis titers >1:8. In multivariate models, factors associated with NEP initiation (p 2500 pesos/month (ARR: .66); and reporting needle sharing (ARR: .71). Uptake of NEP expansion in Tijuana was vigorous among PWID. We identified a range of factors that influenced the likelihood of NEP initiation, including police interaction. These findings have important implications for the scale-up of NEP in Mexico. © American Academy of Addiction Psychiatry.

  6. Impact of equipment failures and wind correlation on generation expansion planning

    DEFF Research Database (Denmark)

    Pineda, S.; Morales, J.M.; Ding, Y.

    2014-01-01

    the generating company (GENCO) and the system operator. The upper-level problem maximizes the GENCO's expected profit, while the lower-level problem simulates an hourly market-clearing procedure, through which LMPs are determined. The uncertainty pertaining to failures and wind power correlation is characterized......Generation expansion planning has become a complex problem within a deregulated electricity market environment due to all the uncertainties affecting the profitability of a given investment. Current expansion models usually overlook some of these uncertainties in order to reduce the computational...

  7. Developing strategic plans for effective utilization of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ridikas, Danas [International Atomic Energy Agency, Vienna (Austria). Dept. of Nuclear Sciences and Applications

    2015-12-15

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  8. Developing strategic plans for effective utilization of research reactors

    International Nuclear Information System (INIS)

    Ridikas, Danas

    2015-01-01

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  9. Light Duty Utility Arm computer software configuration management plan

    International Nuclear Information System (INIS)

    Philipp, B.L.

    1998-01-01

    This plan describes the configuration management for the Light Duty Utility Arm robotic manipulation arm control software. It identifies the requirement, associated documents, and the software control methodology. The Light Duty Utility Ann (LDUA) System is a multi-axis robotic manipulator arm and deployment vehicle, used to perform surveillance and characterization operations in support of remediation of defense nuclear wastes currently stored in the Hanford Underground Storage Tanks (USTs) through the available 30.5 cm (12 in.) risers. This plan describes the configuration management of the LDUA software

  10. Generation Expansion Planning With Large Amounts of Wind Power via Decision-Dependent Stochastic Programming

    Energy Technology Data Exchange (ETDEWEB)

    Zhan, Yiduo; Zheng, Qipeng P.; Wang, Jianhui; Pinson, Pierre

    2017-07-01

    Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined future uncertainties (i.e., fixed random outcomes with given probabilities). In several recent studies of generation assets' planning (e.g., thermal versus renewable), new findings show that the investment decisions could affect the future uncertainties as well. To this end, this paper proposes a multistage decision-dependent stochastic optimization model for long-term large-scale generation expansion planning, where large amounts of wind power are involved. In the decision-dependent model, the future uncertainties are not only affecting but also affected by the current decisions. In particular, the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming model. The wind penetration, investment decisions, and the optimality of the decision-dependent model are evaluated in a series of multistage case studies. The results show that the proposed decision-dependent model provides effective optimization solutions for long-term generation expansion planning.

  11. Long term plan of atomic energy development and utilization

    International Nuclear Information System (INIS)

    1982-01-01

    The atomic energy utilization and development in Japan have progressed remarkably, and already nuclear power generation has borne an important part in electric power supply, while radiation has been utilized in the fields of industry, agriculture, medicine and so on. Now, atomic energy is indispensable for national life and industrial activity. The former long term plan was decided in September, 1978, and the new long term plan should be established since the situation has changed largely. The energy substituting for petroleum has been demanded, and the expectation to nuclear power generation has heightened because it enables stable and economical power supply. The independently developed technology related to atomic energy must be put in practical use. The peaceful utilization of atomic energy must be promoted, while contributing to the nuclear non-proliferation policy. The Atomic Energy Commission of Japan decided the new long term plan to clearly show the outline of the important measures related to atomic energy development and utilization in 10 years hereafter, and the method of its promotion. The basic concept of atomic energy development and utilization, the long term prospect and the concept on the promotion, the method of promoting the development and utilization, and the problems of funds, engineers and location are described. (kako, I.)

  12. Decision analysis in the expansion planning of the Mexican Electrical System

    International Nuclear Information System (INIS)

    Toupiol, S.; Martin del Campo M, C.; Ortega C, R.

    2007-01-01

    In the last years, the planning of the National Interconnected System has been guided mainly to technologies of combined cycle, contributing to the establishment of a generation system little diversified and clerk of the readiness and volatility of the prices of natural gas. On the other hand, the electric system continues expanding without to consider the emissions of gases coming from the electric generation and the significant participation of the renewable and nuclear technologies in the production of electricity like decisive parameters for the long term planning, for what the developed plans are economically attractive but they don't contribute to the respect of the environment, to the sustainable development, neither to the diversification. With base to the above-mentioned intended in this work to develop viable outlines for the long term expansion of the National Interconnected System (period 2005-2024), appealing to the pattern of uni nodal planning that uses the Federal Commission of Electricity at the moment (CFE) that is to say the pattern WASP given by the International Atomic Energy Agency. This way, you fixed as objective to propose two expansion alternatives to the reference plan developed by the CFE in 2005 for the period 2005-2024, with the purpose of not only looking for the good plan of these three plans in terms of the total cost of generation, but also in terms of the risk associated to the price of natural gas, the emissions of dioxide of sulfur and nitrogen oxides generated by the plants of the system and the diversity of the generation park. To compare the three developed plans, you applies an analysis of decision of multiple approaches based on the approach of Savage. Finally, starting from this analysis, he/she intended to determine if the plan of minimum cost represents the long term better option or if it suits but to expand the system being based on a plan that represents the best commitment cost-risk-emission-diversity. (Author)

  13. Tank Farm Contractor Waste Remediation System and Utilization Plan

    International Nuclear Information System (INIS)

    KIRKBRIDE, R.A.

    1999-01-01

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy

  14. Impact of forecast errors on expansion planning of power systems with a renewables target

    DEFF Research Database (Denmark)

    Pineda, Salvador; Morales González, Juan Miguel; Boomsma, Trine Krogh

    2015-01-01

    This paper analyzes the impact of production forecast errors on the expansion planning of a power system and investigates the influence of market design to facilitate the integration of renewable generation. For this purpose, we propose a programming modeling framework to determine the generation...... and transmission expansion plan that minimizes system-wide investment and operating costs, while ensuring a given share of renewable generation in the electricity supply. Unlike existing ones, this framework includes both a day-ahead and a balancing market so as to capture the impact of both production forecasts...... and the associated prediction errors. Within this framework, we consider two paradigmatic market designs that essentially differ in whether the day-ahead generation schedule and the subsequent balancing re-dispatch are co-optimized or not. The main features and results of the model set-ups are discussed using...

  15. Integrated multiperiod power generation and transmission expansion planning with sustainability aspects in a stochastic environment

    International Nuclear Information System (INIS)

    Seddighi, Amir Hossein; Ahmadi-Javid, Amir

    2015-01-01

    This paper presents a multistage stochastic programming model to address sustainable power generation and transmission expansion planning. The model incorporates uncertainties about future electricity demand, fuel prices, greenhouse gas emissions, as well as possible disruptions to which the power system is subject. A number of sustainability regulations and policies are considered to establish a framework for the social responsibility of the power system. The proposed model is applied to a real-world case, and several sensitivity analyses are carried out to provide managerial insights into different aspects of the model. The results emphasize the important role played by sustainability policies on the configuration of the power grid. - Highlights: • This paper considers integrated power generation and transmission expansion planning. • Sustainability aspects are incorporated into a multiperiod stochastic setting. • A stochastic mathematical programming model is developed to address the problem. • The model is applied to a real-world case and numerical studies are carried out

  16. Planning method for integration and expansion of renewable energy sources with special attention to security supply in distribution system

    Energy Technology Data Exchange (ETDEWEB)

    Cerda-Arias, Jose Luis

    2012-07-01

    Today's structure of power systems with competitive wholesale markets for electricity encourages the introduction of new agents and products, customers with self-generating capacity and the specialization of generators, network operators and power suppliers. Furthermore one has to take into account the variation of the fossil fuel prices in the world market, which even anticipates the closeness of its scarcity, the instability of the fulfilment of contracts, and the existence of import restrictions. In addition the implementation of policies aiming to control CO{sub 2} emissions, and efficient use of energy plus the advent of more efficient technologies have to be incorporated in new network expansion projects. These are forcing utilities and society to seek new forms of electric system expansion without affecting their economic growth. This expresses a challenge to sustain such a growth changing the vision for the power system and the required security of electricity supply, usually based on internal factors of the electric sector, without considering the connection between the current transmission and distribution networks, the uncertainties related to the competition in the electricity market and the effect of distributed generation units. The high penetration of distributed generation resources, based on renewable energy sources, is increasingly observed worldwide and it depends on the cost of the technologies, market design, and subsidies. On that account, it is necessary to find alternatives and offers to develop a sustainable strategic plan for power system expansion. Currently, efforts are oriented to develop planning models which consider the income of power generation based on renewable energy sources founded on these new requirements, bearing in mind the relationship between the competitive markets and the power system planning. In this Thesis a general planning method for the expansion of the power grids is proposed. This planning method should

  17. AC transmission network expansion planning considering circuits repowering and location of capacitors

    OpenAIRE

    Jaime A. López-López; Diego A. Tejada-Arango; Jesús M. López-Lezama

    2016-01-01

    This paper deals with the Transmission Network Expansion Planning (TNEP) problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To ...

  18. Factors Influencing Utilization of Modern Family Planning Services ...

    African Journals Online (AJOL)

    Factors Influencing Utilization of Modern Family Planning Services among Women of Child Bearing Age (15 - 49 years) in the University of Calabar Teaching Hospital, Calabar. ... Using accidental sampling technique, 150 women of childbearing age were selected to constitute the sample. Data were collected using a ...

  19. A municipal guide to least cost utility planning

    International Nuclear Information System (INIS)

    1992-03-01

    The recent track record of ''traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process

  20. 1989 basic plan for atomic energy development and utilization

    International Nuclear Information System (INIS)

    1989-01-01

    A Basic Plan for Atomic Energy Development and Utilization has been established each year based on the guidelines set up by the Atomic Energy Commission of Japan, with the aim of promoting the development and utilization of atomic energy schematically and efficiently. The Basic Plan shows specific projects to achieve the objectives specified in the Long-Range Plan for Atomic Energy Development and Utilization. The Basic Plan specifies efforts to be made for overall strengthening of safety measures (safety policies, safety research, disaster prevention, etc.), promotion of nuclear power generation, establishment of the nuclear fuel cycle (securing of uranium, technology for uranium enrichment, reprocessing, etc.), development of new types of power reactors (fast breeder reactor, new types of converter reactors, plutonium fuel processing technology), promotion of leading projects (nuclear fusion, utilization of radiations, atomic powered ships, high-temperature engineering tests), promotion of basic technology development (basic research, training of scientists and engineers), voluntary and active international activities (international cooperation), and acquisition of understanding and cooperation of the general public. (N,K.)

  1. A municipal guide to least cost utility planning

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The recent track record of ``traditional`` electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states` least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  2. A municipal guide to least cost utility planning

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The recent track record of traditional'' electricity planning, which entails selection of supply side resources to meet forecasted demand, has not been good. There are numerous examples of utilities incorrectly forecasting demand and over-building generating capacity while others underestimated growth and have had to cut demand and find alternate power sources to avoid outages. A potential solution to this problem is the continuing development of Least Cost Utility Plannning (LCUP). Regulatory commissions, consumer advocates and utilities are increasingly relying an LCUP as the most responsible way to avoid construction of new capacity and alleviate anticipated shortages caused by cancellation of construction projects, load growth, or natural replacement of aging capacity. The purpose of this report is to provide municipalities a starting point for evaluating their servicing utilities or states' least cost plan. This was accomplished by: Identifying key issues in LCUP; reviewing examples of the collaborative and classic approaches to LCUP in Illinois, California, New York State and Michigan; cataloging municipal authorities and strategies which can influence or support LCUP activities. Results of the project indicate that through a basic understanding of LCUP processes and issues, municipalities will be in a better position to influence plans or, if necessary, intervene in regulatory proceedings where plans are adopted. Constraints to municipal involvement in LCUP include statutory limitations, resource constraints, and a lack of knowledge of indirect authorities that support the LCUP process.

  3. ALWR utility requirements - A technical basis for updated emergency planning

    International Nuclear Information System (INIS)

    Leaver, David E.W.; DeVine, John C. Jr.; Santucci, Joseph

    2004-01-01

    U.S. utilities, with substantial support from international utilities, are developing a comprehensive set of design requirements in the form of a Utility Requirements Document (URD) as part of an industry wide effort to establish a technical foundation for the next generation of light water reactors. A key aspect of the URD is a set of severe accident-related design requirements which have been developed to provide a technical basis for updated emergency planning for the ALWR. The technical basis includes design criteria for containment performance and offsite dose during severe accident conditions. An ALWR emergency planning concept is being developed which reflects this severe accident capability. The main conclusion from this work is that the likelihood and consequences of a severe accident for an ALWR are fundamentally different from that assumed in the technical basis for existing emergency planning requirements, at least in the U.S. The current technical understanding of severe accident risk is greatly improved compared to that available when the existing U.S. emergency planning requirements were established nearly 15 years ago, and the emerging ALWR designs have superior core damage prevention and severe accident mitigation capability. Thus, it is reasonable and prudent to reflect this design capability in the emergency planning requirements for the ALWR. (author)

  4. A multiple objective mixed integer linear programming model for power generation expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Antunes, C. Henggeler; Martins, A. Gomes [INESC-Coimbra, Coimbra (Portugal); Universidade de Coimbra, Dept. de Engenharia Electrotecnica, Coimbra (Portugal); Brito, Isabel Sofia [Instituto Politecnico de Beja, Escola Superior de Tecnologia e Gestao, Beja (Portugal)

    2004-03-01

    Power generation expansion planning inherently involves multiple, conflicting and incommensurate objectives. Therefore, mathematical models become more realistic if distinct evaluation aspects, such as cost and environmental concerns, are explicitly considered as objective functions rather than being encompassed by a single economic indicator. With the aid of multiple objective models, decision makers may grasp the conflicting nature and the trade-offs among the different objectives in order to select satisfactory compromise solutions. This paper presents a multiple objective mixed integer linear programming model for power generation expansion planning that allows the consideration of modular expansion capacity values of supply-side options. This characteristic of the model avoids the well-known problem associated with continuous capacity values that usually have to be discretized in a post-processing phase without feedback on the nature and importance of the changes in the attributes of the obtained solutions. Demand-side management (DSM) is also considered an option in the planning process, assuming there is a sufficiently large portion of the market under franchise conditions. As DSM full costs are accounted in the model, including lost revenues, it is possible to perform an evaluation of the rate impact in order to further inform the decision process (Author)

  5. Modeling and solving a large-scale generation expansion planning problem under uncertainty

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Shan; Ryan, Sarah M. [Iowa State University, Department of Industrial and Manufacturing Systems Engineering, Ames (United States); Watson, Jean-Paul [Sandia National Laboratories, Discrete Math and Complex Systems Department, Albuquerque (United States); Woodruff, David L. [University of California Davis, Graduate School of Management, Davis (United States)

    2011-11-15

    We formulate a generation expansion planning problem to determine the type and quantity of power plants to be constructed over each year of an extended planning horizon, considering uncertainty regarding future demand and fuel prices. Our model is expressed as a two-stage stochastic mixed-integer program, which we use to compute solutions independently minimizing the expected cost and the Conditional Value-at-Risk; i.e., the risk of significantly larger-than-expected operational costs. We introduce stochastic process models to capture demand and fuel price uncertainty, which are in turn used to generate trees that accurately represent the uncertainty space. Using a realistic problem instance based on the Midwest US, we explore two fundamental, unexplored issues that arise when solving any stochastic generation expansion model. First, we introduce and discuss the use of an algorithm for computing confidence intervals on obtained solution costs, to account for the fact that a finite sample of scenarios was used to obtain a particular solution. Second, we analyze the nature of solutions obtained under different parameterizations of this method, to assess whether the recommended solutions themselves are invariant to changes in costs. The issues are critical for decision makers who seek truly robust recommendations for generation expansion planning. (orig.)

  6. Development of the computer model by using LINGO for Electric System Expansion Planning

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Man Ki; Kim, Seung Su [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-05-01

    The main purpose of this study is to develop the electric system expansion planning model based on linear programming method and to describe how to use the model. The algorithm of linear programming is provided by LINGO. The decision variables are electric generation capacity per period and electricity generated by fuel types per year. Integer program is implemented in the model in order to consider indivisibility of electric capacities. The model also allows the constraint of CO{sub 2} to be considered in the planning. (Author) 4 refs.,.

  7. Distribution Network Expansion Planning Based on Multi-objective PSO Algorithm

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Wu, Qiuwei

    2013-01-01

    This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, energy losses cost, and power congestion cost. A two-phase multi-objective PSO...... algorithm was proposed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach and the improved multi-objective PSO have been verified...

  8. Comprehensive Smart Grid Planning in a Regulated Utility Environment

    Science.gov (United States)

    Turner, Matthew; Liao, Yuan; Du, Yan

    2015-06-01

    This paper presents the tools and exercises used during the Kentucky Smart Grid Roadmap Initiative in a collaborative electric grid planning process involving state regulators, public utilities, academic institutions, and private interest groups. The mandate of the initiative was to assess the existing condition of smart grid deployments in Kentucky, to enhance understanding of smart grid concepts by stakeholders, and to develop a roadmap for the deployment of smart grid technologies by the jurisdictional utilities of Kentucky. Through involvement of many important stakeholder groups, the resultant Smart Grid Deployment Roadmap proposes an aggressive yet achievable strategy and timetable designed to promote enhanced availability, security, efficiency, reliability, affordability, sustainability and safety of the electricity supply throughout the state while maintaining Kentucky's nationally competitive electricity rates. The models and methods developed for this exercise can be utilized as a systematic process for the planning of coordinated smart grid deployments.

  9. Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market

    International Nuclear Information System (INIS)

    Hemmati, Reza; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin

    2013-01-01

    Highlights: • Generation expansion planning is presented in deregulated electricity market. • Wind farm uncertainty is modeled in the problem. • The profit of each GENCO is maximized and also the safe operation of system is satisfied. • Salve sector is managed as an optimization programming and solved by using PSO technique. • Master sector is considered in pool market and Cournot model is used to simulate it. - Abstract: This paper addresses reliability constrained generation expansion planning (GEP) in the presence of wind farm uncertainty in deregulated electricity market. The proposed GEP aims at maximizing the expected profit of all generation companies (GENCOs), while considering security and reliability constraints such as reserve margin and loss of load expectation (LOLE). Wind farm uncertainty is also considered in the planning and GENCOs denote their planning in the presence of wind farm uncertainty. The uncertainty is modeled by probability distribution function (PDF) and Monte-Carlo simulation (MCS) is used to insert uncertainty into the problem. The proposed GEP is a constrained, nonlinear, mixed-integer optimization programming and solved by using particle swarm optimization (PSO) method. In this paper, Electricity market structure is modeled as a pool market. Simulation results verify the effectiveness and validity of the proposed planning for maximizing GENCOs profit in the presence of wind farms uncertainties in electricity market

  10. Efficient energy utilization and environmental issues applied to power planning

    International Nuclear Information System (INIS)

    Campbell, Hector; Montero, Gisela; Perez, Carlos; Lambert, Alejandro

    2011-01-01

    This document shows the importance of policies for electric energy savings and efficient energy utilization in power planning. The contributions of economic, social, and environmental items were evaluated according to their financial effects in the delay of investments, reduction of production costs and decrement of environmental emissions. The case study is Baja California, Mexico; this system has a unique primary source: geothermal energy. Whether analyzing the planning as usual or planning from the supply side, the forecast for 2005-2025 indicates that 4500 MW additional installed capacity will be required (3-times current capacity), representing an investment that will emit 12.7 Mton per year of CO 2 to the atmosphere and will cost US$2.8 billion. Systemic planning that incorporates polices of energy savings and efficiency allows the reduction of investments and pollutant emissions. For example, a reduction of 20% in the growth trend of the electricity consumption in the industrial customers would save US$10.4 billion over the next 20 years, with a potential reduction of 1.6 Mton/year of CO 2 . The increase in geothermal power generation is also attractive, and it can be combined with the reduction of use and energy losses of utilities, which would save US$13.5 billion and prevent the discharge of 8.5 Mton/year of CO 2 . - Highlights: → We contrast power planning methods for supply electricity for economy development. → Importance of policies for electricity savings and efficient use in power planning. → Systemic planning facilitates decision-making process for electricity optimization. → Supply-side planning will cause climb in prices and loss of energy self-sufficiency. → Power planning should be immersed in an environment of appropriate energy policies.

  11. Planning Routes Across Economic Terrains: Maximizing Utility, Following Heuristics

    Science.gov (United States)

    Zhang, Hang; Maddula, Soumya V.; Maloney, Laurence T.

    2010-01-01

    We designed an economic task to investigate human planning of routes in landscapes where travel in different kinds of terrain incurs different costs. Participants moved their finger across a touch screen from a starting point to a destination. The screen was divided into distinct kinds of terrain and travel within each kind of terrain imposed a cost proportional to distance traveled. We varied costs and spatial configurations of terrains and participants received fixed bonuses minus the total cost of the routes they chose. We first compared performance to a model maximizing gain. All but one of 12 participants failed to adopt least-cost routes and their failure to do so reduced their winnings by about 30% (median value). We tested in detail whether participants’ choices of routes satisfied three necessary conditions (heuristics) for a route to maximize gain. We report failures of one heuristic for 7 out of 12 participants. Last of all, we modeled human performance with the assumption that participants assign subjective utilities to costs and maximize utility. For 7 out 12 participants, the fitted utility function was an accelerating power function of actual cost and for the remaining 5, a decelerating power function. We discuss connections between utility aggregation in route planning and decision under risk. Our task could be adapted to investigate human strategy and optimality of route planning in full-scale landscapes. PMID:21833269

  12. PLANNING ROUTES ACROSS ECONOMIC TERRAINS: MAXIMIZING UTILITY, FOLLOWING HEURISTICS

    Directory of Open Access Journals (Sweden)

    Hang eZhang

    2010-12-01

    Full Text Available We designed an economic task to investigate human planning of routes in landscapes where travel in different kinds of terrain incurs different costs. Participants moved their finger across a touch screen from a starting point to a destination. The screen was divided into distinct kinds of terrain and travel within each kind of terrain imposed a cost proportional to distance traveled. We varied costs and spatial configurations of terrains and participants received fixed bonuses minus the total cost of the routes they chose. We first compared performance to a model maximizing gain. All but one of 12 participants failed to adopt least-cost routes and their failure to do so reduced their winnings by about 30% (median value. We tested in detail whether participants’ choices of routes satisfied three necessary conditions (heuristics for a route to maximize gain. We report failures of one heuristic for 7 out of 12 participants. Last of all, we modeled human performance with the assumption that participants assign subjective utilities to costs and maximize utility. For 7 out 12 participants, the fitted utility function was an accelerating power function of actual cost and for the remaining 5, a decelerating power function. We discuss connections between utility aggregation in route planning and decision under risk. Our task could be adapted to investigate human strategy and optimality of route planning in full-scale landscapes.

  13. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    International Nuclear Information System (INIS)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih; Abu-Zarour, Mohammad

    2010-01-01

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.

  14. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih [Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328 (Jordan); Abu-Zarour, Mohammad [NEPCO, Department of Generation Planning, P.O. Box 2310, Amman 11194 (Jordan)

    2010-10-15

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems. (author)

  15. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  16. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-IV. User's manual

    International Nuclear Information System (INIS)

    2001-01-01

    As a continuation of its efforts to provide methodologies and tools to Member States to carry out comparative assessment and analyse priority environmental issues related to the development of the electric power sector, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package WASP-IV for carrying out power generation expansion planning taking into consideration fuel availability and environmental constraints. This manual constitutes a part of this work and aims to provide users with a guide to use effectively the new version of the model WASP-IV. WASP was originally developed in 1972 by the Tennessee Valley Authority and the Oak Ridge National Laboratory in the USA to meet the IAEA needs to analyse the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. Previous versions of the model were used by Member States in many national and regional studies to analyse the electric power system expansion planning and the role of nuclear energy in particular. Experience gained from its application allowed development of WASP into a very comprehensive planning tool for electric power system expansion analysis. New, improved versions were developed, which took into consideration the needs expressed by the users of the programme in order to address important emerging issues being faced by the electric system planners. In 1979, WASP-IV was released and soon after became an indispensable tool in many Member States for generation expansion planning. The WASP-IV version was continually upgraded and the development of version WASP-III Plus commenced in 1992. By 1995, WASP-III Plus was completed, which followed closely the methodology of the WASP-III but incorporated new features. In order to meet the needs of electricity planners and following the recommendations of the Helsinki symposium, development of a new version of WASP was

  17. Evaluation of enrollee satisfaction with Iowa's Dental Wellness Plan for the Medicaid expansion population.

    Science.gov (United States)

    Reynolds, Julie C; McKernan, Susan C; Sukalski, Jennifer M C; Damiano, Peter C

    2018-12-01

    Dental coverage for Iowa's Medicaid expansion population is provided through the Dental Wellness Plan (DWP), implemented in May 2014. The plan targets healthy behavior incentives via an earned benefits structure, whereby additional services are covered if enrollees return every 6-12 months for routine dental visits. This study examines enrollee satisfaction with the DWP. We surveyed a random sample of DWP enrollees 1 year after program implementation about their experiences. Survey items covered dental plan satisfaction, self-rated measures of health, and knowledge and attitudes toward the earned benefits approach. Dental plan satisfaction was rated as low by 38 percent of respondents (n = 416), moderate by 25 percent (n = 276), and high by 37 percent (n = 402). A majority of respondents (66 percent) did not know about the earned benefits structure. Regression analysis indicated that respondents most likely to have low plan satisfaction were those who felt it was difficult to earn benefits (OR 3.66, P < 0.001) and those who were unable to find (OR 3.17, P < 0.001), or did not try to find (OR 3.51, P < 0.001), a regular dentist in the plan. Satisfaction with a new model of dental insurance was influenced by whether enrollees had a regular source of care and their perceived ability to return for regular checkups in order to earn covered benefits. © 2017 American Association of Public Health Dentistry.

  18. Development of a regional capacity expansion plan in the Russian Federation. Application of the WASP Model

    International Nuclear Information System (INIS)

    Chernilin, Yu.; Kononov, S.; Zakharova, E.; Kagramanyan, V.; Malenkov, A.

    1997-01-01

    The Wien Automatic System Planning Package (WASP) is used for the development of optimal capacity expansion plans in Russia. The object of the WASP study is the Central power pool, which is the largest power pool in Russia and has an essential share of nuclear power in electricity generation. The objective of the study is to assess the long-term competitiveness of nuclear power in the region. The major features of the power system analyzed with WASP are the following: 1) four types of electricity generators are considered: condensity fossil fuel plants, cogeneration fossil fuel plants, nuclear power plants and hydraulic plants; 2) nine fuel categories are considered: gas/fuel oil fuel, several types of coal and several nuclear fuels; 3) escalation of capital, operation and maintenance, and fuel costs as a result of economic transition is explicitly modeled. Under these assumptions, a regional optimal capacity expansion plan is developed that showed the following: (a) Until 2004 there is no need for new electricity generation capacities due to the drop in demand in the 90s, certain lifetime margin of existing capacities, committed additions of co-generators and planned refurbishment/repowering measures; (b) The structure of the optimal capacity mix confirms that nuclear power can retain its role as one of the major electricity generation sources in the region. The most important factor with a positive of effect upon the competitiveness of nuclear power plants is the projected escalation of the prices of fossil fuels; (c) The application of WASP has proved that the model can serve as a valuable planning tool at the power pool level in Russia. (author). 14 refs, 8 figs, 10 tabs

  19. Development of a regional capacity expansion plan in the Russian Federation. Application of the WASP Model

    Energy Technology Data Exchange (ETDEWEB)

    Chernilin, Yu; Kononov, S; Zakharova, E [Russian Research Inst. ` ` Kurchatov Inst.` ` , Moscow (Russian Federation); Kagramanyan, V; Malenkov, A [Institute of Physics and Power Engineering, Obninsk (Russian Federation)

    1997-09-01

    The Wien Automatic System Planning Package (WASP) is used for the development of optimal capacity expansion plans in Russia. The object of the WASP study is the Central power pool, which is the largest power pool in Russia and has an essential share of nuclear power in electricity generation. The objective of the study is to assess the long-term competitiveness of nuclear power in the region. The major features of the power system analyzed with WASP are the following: 1) four types of electricity generators are considered: condensity fossil fuel plants, cogeneration fossil fuel plants, nuclear power plants and hydraulic plants; 2) nine fuel categories are considered: gas/fuel oil fuel, several types of coal and several nuclear fuels; 3) escalation of capital, operation and maintenance, and fuel costs as a result of economic transition is explicitly modeled. Under these assumptions, a regional optimal capacity expansion plan is developed that showed the following: (a) Until 2004 there is no need for new electricity generation capacities due to the drop in demand in the 90s, certain lifetime margin of existing capacities, committed additions of co-generators and planned refurbishment/repowering measures; (b) The structure of the optimal capacity mix confirms that nuclear power can retain its role as one of the major electricity generation sources in the region. The most important factor with a positive of effect upon the competitiveness of nuclear power plants is the projected escalation of the prices of fossil fuels; (c) The application of WASP has proved that the model can serve as a valuable planning tool at the power pool level in Russia. (author). 14 refs, 8 figs, 10 tabs.

  20. A fuzzy approach to the generation expansion planning problem in a multi-objective environment

    International Nuclear Information System (INIS)

    Abass, S. A.; Massoud, E. M. A.; Abass, S. A.)

    2007-01-01

    In many power system problems, the use of optimization techniques has proved inductive to reducing the costs and losses of the system. A fuzzy multi-objective decision is used for solving power system problems. One of the most important issues in the field of power system engineering is the generation expansion planning problem. In this paper, we use the concepts of membership functions to define a fuzzy decision model for generating an optimal solution for this problem. Solutions obtained by the fuzzy decision theory are always efficient and constitute the best compromise. (author)

  1. PLN's experience with the WASP-III model in generation expansion planning for the Java system

    International Nuclear Information System (INIS)

    Sudja, N.; Afiff, A.; Simarmata, B.

    1988-01-01

    The State Electric Power Corporation of Indonesia (PLN) was one of the first recipients of the WASP computer model, and since 1976 has been using the model (first the version WASP-II, and later the WASP-III version) for carrying out generation expansion planning studies for the country, and particularly, for the Java power system. This paper discusses PLN's experience with WASP-III and comments on some problems and constraints encountered, particularly: the time-fixed forced outage rate (FOR) assumed for generating units, simulation of the hydro system and computation time. The paper concludes with some suggestions about future enhancements to WASP-III. (author). 3 figs, 11 tabs

  2. Generation Expansion Planning with Large Amounts of Wind Power via Decision-Dependent Stochastic Programming

    DEFF Research Database (Denmark)

    Zhan, Yiduo; Zheng, Qipeng; Wang, Jianhui

    2016-01-01

    , the probability distribution function is determined by not only input parameters but also decision variables. To deal with the nonlinear constraints in our model, a quasi-exact solution approach is then introduced to reformulate the multistage stochastic investment model to a mixed-integer linear programming......Power generation expansion planning needs to deal with future uncertainties carefully, given that the invested generation assets will be in operation for a long time. Many stochastic programming models have been proposed to tackle this challenge. However, most previous works assume predetermined...

  3. AC transmission network expansion planning considering circuits repowering and location of capacitors

    Directory of Open Access Journals (Sweden)

    Jaime A. López-López

    2016-07-01

    Full Text Available This paper deals with the Transmission Network Expansion Planning (TNEP problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To take into account these last ones an AC model of the transmission network is considered. The solution of the proposed model is carried out using a Hybrid Genetic Algorithm. Results are compared and validated with previous works in the technical literature. The test systems used are the Garver system and IEEE 24 bus system. The results obtained in both systems showed that the inclusion of the non-conventional candidates, proposed in this paper, allows to reduce the cost of network expansion. This fact may be useful as an indicator for the system planner to consider new possibilities in the expansion studies.

  4. APPLICATION OF RESTART COVARIANCE MATRIX ADAPTATION EVOLUTION STRATEGY (RCMA-ES TO GENERATION EXPANSION PLANNING PROBLEM

    Directory of Open Access Journals (Sweden)

    K. Karthikeyan

    2012-10-01

    Full Text Available This paper describes the application of an evolutionary algorithm, Restart Covariance Matrix Adaptation Evolution Strategy (RCMA-ES to the Generation Expansion Planning (GEP problem. RCMA-ES is a class of continuous Evolutionary Algorithm (EA derived from the concept of self-adaptation in evolution strategies, which adapts the covariance matrix of a multivariate normal search distribution. The original GEP problem is modified by incorporating Virtual Mapping Procedure (VMP. The GEP problem of a synthetic test systems for 6-year, 14-year and 24-year planning horizons having five types of candidate units is considered. Two different constraint-handling methods are incorporated and impact of each method has been compared. In addition, comparison and validation has also made with dynamic programming method.

  5. NSGA-II algorithm for multi-objective generation expansion planning problem

    Energy Technology Data Exchange (ETDEWEB)

    Murugan, P.; Kannan, S. [Electronics and Communication Engineering Department, Arulmigu Kalasalingam College of Engineering, Krishnankoil 626190, Tamilnadu (India); Baskar, S. [Electrical Engineering Department, Thiagarajar College of Engineering, Madurai 625015, Tamilnadu (India)

    2009-04-15

    This paper presents an application of Elitist Non-dominated Sorting Genetic Algorithm version II (NSGA-II), to multi-objective generation expansion planning (GEP) problem. The GEP problem is considered as a two-objective problem. The first objective is the minimization of investment cost and the second objective is the minimization of outage cost (or maximization of reliability). To improve the performance of NSGA-II, two modifications are proposed. One modification is incorporation of Virtual Mapping Procedure (VMP), and the other is introduction of controlled elitism in NSGA-II. A synthetic test system having 5 types of candidate units is considered here for GEP for a 6-year planning horizon. The effectiveness of the proposed modifications is illustrated in detail. (author)

  6. Flexible Multi-Objective Transmission Expansion Planning with Adjustable Risk Aversion

    Directory of Open Access Journals (Sweden)

    Jing Qiu

    2017-07-01

    Full Text Available This paper presents a multi-objective transmission expansion planning (TEP framework. Rather than using the conventional deterministic reliability criterion, a risk component based on the probabilistic reliability criterion is incorporated into the TEP objectives. This risk component can capture the stochastic nature of power systems, such as load and wind power output variations, component availability, and incentive-based demand response (IBDR costs. Specifically, the formulation of risk value after risk aversion is explicitly given, and it aims to provide network planners with the flexibility to conduct risk analysis. Thus, a final expansion plan can be selected according to individual risk preferences. Moreover, the economic value of IBDR is modeled and integrated into the cost objective. In addition, a relatively new multi-objective evolutionary algorithm called the MOEA/D is introduced and employed to find Pareto optimal solutions, and tradeoffs between overall cost and risk are provided. The proposed approach is numerically verified on the Garver’s six-bus, IEEE 24-bus RTS and Polish 2383-bus systems. Case study results demonstrate that the proposed approach can effectively reduce cost and hedge risk in relation to increasing wind power integration.

  7. Decision analysis in the expansion planning of the Mexican Electrical System; Analisis de decision en la planificacion de la expansion del Sistema Electrico Mexicano

    Energy Technology Data Exchange (ETDEWEB)

    Toupiol, S.; Martin del Campo M, C.; Ortega C, R. [Departamento de Sistemas Energeticos, Facultad de Ingenieria UNAM, Circuito Exterior s/n, Ciudad Universitaria, 04510 Mexico D.F. (Mexico)]. e-mail: stoupiol@yahoo.fr

    2007-07-01

    In the last years, the planning of the National Interconnected System has been guided mainly to technologies of combined cycle, contributing to the establishment of a generation system little diversified and clerk of the readiness and volatility of the prices of natural gas. On the other hand, the electric system continues expanding without to consider the emissions of gases coming from the electric generation and the significant participation of the renewable and nuclear technologies in the production of electricity like decisive parameters for the long term planning, for what the developed plans are economically attractive but they don't contribute to the respect of the environment, to the sustainable development, neither to the diversification. With base to the above-mentioned intended in this work to develop viable outlines for the long term expansion of the National Interconnected System (period 2005-2024), appealing to the pattern of uni nodal planning that uses the Federal Commission of Electricity at the moment (CFE) that is to say the pattern WASP given by the International Atomic Energy Agency. This way, you fixed as objective to propose two expansion alternatives to the reference plan developed by the CFE in 2005 for the period 2005-2024, with the purpose of not only looking for the good plan of these three plans in terms of the total cost of generation, but also in terms of the risk associated to the price of natural gas, the emissions of dioxide of sulfur and nitrogen oxides generated by the plants of the system and the diversity of the generation park. To compare the three developed plans, you applies an analysis of decision of multiple approaches based on the approach of Savage. Finally, starting from this analysis, he/she intended to determine if the plan of minimum cost represents the long term better option or if it suits but to expand the system being based on a plan that represents the best commitment cost-risk-emission-diversity. (Author)

  8. Morphology of reprocessing: a case for regional utility planning

    International Nuclear Information System (INIS)

    Stoller, S.M.

    1976-01-01

    The change in entrepreneurial climate in reprocessing and recycle, which has taken place in the last few years, is reviewed. The climatic change, which has reached the point where the economic benefits of that fuel cycle segment are being questioned, is characterized. The author outlines the reasons he feels the benefits are positive. Some of the principal risks facing the entrepreneur are outlined and the suggestion is made that participation by the utility customers for a major project throughout its planning process is critical. In this context, the logic for a regional organization of such utilities, customers, drawing heavily from a study conducted by a group of utilities in the western United States during 1975, is outlined. The paper concludes with some general observations in support of the thesis that new structural forms are likely required for reprocessing facilities, as well as those for other major segments of the fuel cycle, if utilities are to be able to view with confidence the prospect of having such facilities in place in a timely fashion

  9. Integrated Renewable Hydrogen Utility System (IRHUS) business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This business plan is for a proposed legal entity named IRHUS, Inc. which is to be formed as a subsidiary of Energy Partners, L.C. (EP) of West Palm Beach, Florida. EP is a research and development company specializing in hydrogen proton exchange membrane (PEM) fuel cells and systems. A fuel cell is an engine with no moving parts that takes in hydrogen and produces electricity. The purpose of IRHUS, Inc. is to develop and manufacture a self-sufficient energy system based on the fuel cell and other new technology that produces hydrogen and electricity. The product is called the Integrated renewable Hydrogen utility System (IRHUS). IRHUS, Inc. plans to start limited production of the IRHUS in 2002. The IRHUS is a unique product with an innovative concept in that it provides continuous electrical power in places with no electrical infrastructure, i.e., in remote and island locations. The IRHUS is a zero emissions, self-sufficient, hydrogen fuel generation system that produces electricity on a continuous basis by combining any renewable power source with hydrogen technology. Current plans are to produce a 10 kilowatt IRHUS MP (medium power). Future plans are to design and manufacture IRHUS models to provide power for a variety of power ranges for identified attractive market segments. The technological components of the IRHUS include an electrolyzer, hydrogen and oxygen storage subsystems, fuel cell system, and power control system. The IRHUS product is to be integrated with a variety of renewable energy technologies. 5 figs., 10 tabs.

  10. The Flexible Solar Utility. Preparing for Solar's Impacts to Utility Planning and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, John [Solar Electric Power Association (SEPA), Washington, DC (United States); Davidovich, Ted [Solar Electric Power Association (SEPA), Washington, DC (United States); Cory, Karlynn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aznar, Alexandra [National Renewable Energy Lab. (NREL), Golden, CO (United States); McLaren, Joyce [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This paper seeks to provide a flexible utility roadmap for identifying the steps that need to be taken to place the utility in the best position for addressing solar in the future. Solar growth and the emergence of new technologies will change the electric utility of tomorrow. Although not every utility, region, or market will change in the same way or magnitude, developing a path forward will be needed to reach the Electric System of the Future in the coming decades. In this report, a series of potential future states are identified that could result in drastically different energy mixes and profiles: 1) Business as Usual, 2) Low Carbon, Centralized Generation, 3) Rapid Distributed Energy Resource Growth, 4) Interactivity of Both the Grid and Demand, and 5) Grid or Load Defection. Complicating this process are a series of emerging disruptions; decisions or events that will cause the electric sector to change. Understanding and preparing for these items is critical for the transformation to any of the future states to be successful. Predicting which future state will predominate 15 years from now is not possible; however, utilities still will need to look ahead and try to anticipate how factors will impact their planning, operations, and business models. In order to dig into the potential transformations facing the utility industry, the authors conducted a series of utility interviews, held a working session at a major industry solar conference, and conducted a quantitative survey. To focus conversations, the authors leveraged the Rapid Distributed Energy Resource (DER) Growth future to draw out how utilities would have to adapt from current processes and procedures in order to manage and thrive in that new environment. Distributed solar was investigated specifically, and could serve as a proxy resource for all distributed generation (DG). It can also provide the foundation for all DERs.

  11. A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraints

    International Nuclear Information System (INIS)

    Koltsaklis, Nikolaos E.; Georgiadis, Michael C.

    2015-01-01

    Highlights: • A short-term structured investment planning model has been developed. • Unit commitment problem is incorporated into the long-term planning horizon. • Inherent intermittency of renewables is modelled in a comprehensive way. • The impact of CO_2 emission pricing in long-term investment decisions is quantified. • The evolution of system’s marginal price is evaluated for all the planning horizon. - Abstract: This work presents a generic mixed integer linear programming (MILP) model that integrates the unit commitment problem (UCP), i.e., daily energy planning with the long-term generation expansion planning (GEP) framework. Typical daily constraints at an hourly level such as start-up and shut-down related decisions (start-up type, minimum up and down time, synchronization, soak and desynchronization time constraints), ramping limits, system reserve requirements are combined with representative yearly constraints such as power capacity additions, power generation bounds of each unit, peak reserve requirements, and energy policy issues (renewables penetration limits, CO_2 emissions cap and pricing). For modelling purposes, a representative day (24 h) of each month over a number of years has been employed in order to determine the optimal capacity additions, electricity market clearing prices, and daily operational planning of the studied power system. The model has been tested on an illustrative case study of the Greek power system. Our approach aims to provide useful insight into strategic and challenging decisions to be determined by investors and/or policy makers at a national and/or regional level by providing the optimal energy roadmap under real operating and design constraints.

  12. Problems of heat sources modeling on stage of isolated power systems expansion planning

    International Nuclear Information System (INIS)

    Malenkov, A.V.; Reshetnikova, L.N.; Sergeev, Yu.A.

    1998-01-01

    It is necessary to use computer codes for evaluation of possible applications and role of nuclear district heating plants in the local self-balancing power and heating systems, which are to be located in the remote isolated and hardly accessible regions in the Far North of Russia. Key factors in determining system configurations and its performances are: (1) interdependency of electricity, heat and fuel supply; (2) long distance between energy consumer centres (from several tens up to some hundred kilometers); and (3) difficulty in export and import of the electricity, especially the fuel in and from neighbouring and remote regions. The problem to challenge is to work out an optimum expansion plan of the local electricity and heat supply system. The ENPEP (ENergy and Power Evaluation Program) software package, which was developed by IAEA together with the USA Argonne National Laboratory, was chosen for this purpose. The Chaun-Bilibino power system (CBPS), an isolated power system in far North-East region of Russia, was selected as the first case of the ENPEP study. ENPEP allows a complex approach in the system expansion optimization planning in the time frame of planning period of up to 30 years. The key ENPEP module, ELECTRIC, considers electricity as the only product. The cogeneration part (heat production) must be considered outside the ELECTRIC model and then the results to be transfer ed to ELECTRIC. The ENPEP study on the Chaun-Bilibino isolated power system has shown that the modelling of the heat supply sources in ENPEP is not a trivial problem. It is very important and difficult to correctly represent specific features of cogeneration process at the same time. (author)

  13. An investigation on the impacts of regulatory interventions on wind power expansion in generation planning

    International Nuclear Information System (INIS)

    Alishahi, Ehsan; Moghaddam, Mohsen P.; Sheikh-El-Eslami, Mohammad K.

    2011-01-01

    Large integration of intermittent wind generation in power system has necessitated the inclusion of more innovative and sophisticated approaches in power system investment planning. This paper presents a novel framework on the basis of a combination of stochastic dynamic programming (SDP) algorithm and game theory to study the impacts of different regulatory interventions to promote wind power investment in generation expansion planning. In this study, regulatory policies include Feed-in-Tariff (FIT) incentive, quota and tradable green certificate. The intermittent nature and uncertainties of wind power generation will cause the investors encounter risk in their investment decisions. To overcome this problem, a novel model has been derived to study the regulatory impacts on wind generation expansion planning. In our approach, the probabilistic nature of wind generation is modeled. The model can calculate optimal investment strategies, in which the wind power uncertainty is included. This framework is implemented on a test system to illustrate the working of the proposed approach. The result shows that FITs are the most effective policy to encourage the rapid and sustained deployment of wind power. FITs can significantly reduce the risks of investing in renewable energy technologies and thus create conditions conducive to rapid market growth. - Highlights: → The impacts of regulatory policies to promote wind power investment are investigated. → These policies include Feed-in-Tariff (FIT), quota and tradable green certificate. → Result shows that FIT is an effective policy to motivate the rapid growth of wind power. → In quota, customers are forced to provide the quota decided by regulators from wind.

  14. Scoping study of integrated resource planning needs in the public utility sector

    Energy Technology Data Exchange (ETDEWEB)

    Garrick, C J; Garrick, J M; Rue, D R [NEOS Corp., Lakewood, CO (United States)

    1993-06-01

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  15. Greater utilization of wood residue fuels through improved financial planning

    International Nuclear Information System (INIS)

    Billings, C.D.; Ziemke, M.C.; Stanford, R.

    1991-01-01

    Recent events have focused attention on the promotion of greater utilization of biomass fuel. Considerations include the need to reduce increases in global warming and also to improve ground level air quality by limiting the use of fossil fuels. However, despite all these important environmentally related considerations, economics remains the most important factor in the decision process used to determine the feasibility of using available renewable fuels instead of more convenient fossil fuels. In many areas of the Southeast, this decision process involves choosing between wood residue fuels such as bark, sawdust and shavings and presently plentiful natural gas. The primary candidate users of wood residue fuels are industries that use large amounts of heat and electric power and are located near centers of activity in the forest products industry such as sawmills, veneer mills and furniture factories. Given that such facilities both produce wood residues and need large amounts of heat and electricity, it is understandable that these firms are often major users of wood-fired furnaces and boilers. The authors have observed that poor or incomplete financial planning by the subject firms is a major barrier to economic utilization of inexpensive and widely available renewable fuels. In this paper, the authors suggest that wider usage of improved financial planning could double the present modest annual incidence of new commercial wood-fueled installation

  16. Applying Utility Functions to Adaptation Planning for Home Automation Applications

    Science.gov (United States)

    Bratskas, Pyrros; Paspallis, Nearchos; Kakousis, Konstantinos; Papadopoulos, George A.

    A pervasive computing environment typically comprises multiple embedded devices that may interact together and with mobile users. These users are part of the environment, and they experience it through a variety of devices embedded in the environment. This perception involves technologies which may be heterogeneous, pervasive, and dynamic. Due to the highly dynamic properties of such environments, the software systems running on them have to face problems such as user mobility, service failures, or resource and goal changes which may happen in an unpredictable manner. To cope with these problems, such systems must be autonomous and self-managed. In this chapter we deal with a special kind of a ubiquitous environment, a smart home environment, and introduce a user-preference-based model for adaptation planning. The model, which dynamically forms a set of configuration plans for resources, reasons automatically and autonomously, based on utility functions, on which plan is likely to best achieve the user's goals with respect to resource availability and user needs.

  17. A mangrove creek restoration plan utilizing hydraulic modeling.

    Science.gov (United States)

    Marois, Darryl E; Mitsch, William J

    2017-11-01

    Despite the valuable ecosystem services provided by mangrove ecosystems they remain threatened around the globe. Urban development has been a primary cause for mangrove destruction and deterioration in south Florida USA for the last several decades. As a result, the restoration of mangrove forests has become an important topic of research. Using field sampling and remote-sensing we assessed the past and present hydrologic conditions of a mangrove creek and its connected mangrove forest and brackish marsh systems located on the coast of Naples Bay in southwest Florida. We concluded that the hydrology of these connected systems had been significantly altered from its natural state due to urban development. We propose here a mangrove creek restoration plan that would extend the existing creek channel 1.1 km inland through the adjacent mangrove forest and up to an adjacent brackish marsh. We then tested the hydrologic implications using a hydraulic model of the mangrove creek calibrated with tidal data from Naples Bay and water levels measured within the creek. The calibrated model was then used to simulate the resulting hydrology of our proposed restoration plan. Simulation results showed that the proposed creek extension would restore a twice-daily flooding regime to a majority of the adjacent mangrove forest and that there would still be minimal tidal influence on the brackish marsh area, keeping its salinity at an acceptable level. This study demonstrates the utility of combining field data and hydraulic modeling to aid in the design of mangrove restoration plans.

  18. State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan

    International Nuclear Information System (INIS)

    1993-12-01

    The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites

  19. Generation Expansion Planning in pool market: A hybrid modified game theory and improved genetic algorithm

    International Nuclear Information System (INIS)

    Shayanfar, H.A.; Lahiji, A. Saliminia; Aghaei, J.; Rabiee, A.

    2009-01-01

    Unlike the traditional policy, Generation Expansion Planning (GEP) problem in competitive framework is complicated. In the new policy, each Generation Company (GENCO) decides to invest in such a way that obtains as much profit as possible. This paper presents a new hybrid algorithm to determine GEP in a Pool market. The proposed algorithm is divided in two programming levels: master and slave. In the master level a Modified Game Theory (MGT) is proposed to evaluate the contrast of GENCOs by the Independent System Operator (ISO). In the slave level, an Improved Genetic Algorithm (IGA) method is used to find the best solution of each GENCO for decision-making of investment. The validity of the proposed method is examined in the case study including three GENCOs with multi-type of power plants. The results show that the presented method is both satisfactory and consistent with expectation. (author)

  20. Generation expansion planning in Pool market: A hybrid modified game theory and particle swarm optimization

    International Nuclear Information System (INIS)

    Moghddas-Tafreshi, S.M.; Shayanfar, H.A.; Saliminia Lahiji, A.; Rabiee, A.; Aghaei, J.

    2011-01-01

    Unlike the traditional policy, Generation Expansion Planning (GEP) problem in competitive framework is complicated. In the new policy, each GENeration COmpany (GENCO) decides to invest in such a way that obtains as much profit as possible. This paper presents a new hybrid algorithm to determine GEP in a Pool market. The proposed algorithm is divided in two programming levels: master and slave. In the master level a modified game theory (MGT) is proposed to evaluate the contrast of GENCOs by the Independent System Operator (ISO). In the slave level, a particle swarm optimization (PSO) method is used to find the best solution of each GENCO for decision-making of investment. The validity of the proposed method is examined in the case study including three GENCOs with multi-types of power plants. The results show that the presented method is both satisfactory and consistent with expectation.

  1. Planning for a major expansion of the olympic dam copper/uranium resource in South Australia

    International Nuclear Information System (INIS)

    Higgins, R. J.

    2006-01-01

    Full text: Full text: The polymetallic Olympic Dam deposit in northern South Australia contains the world's largest known economic uranium resource. The current resource estimate is 3,970 million tones at 0.4 kg/t U308. Uranium is a co-product of an existing operation that also produces copper, gold and silver. Production began in 1998. Ore mined in 2006 is expected to be close to 10 million tones to produce 4,500 tonnes of uranium oxide and 220,000 tonnes of copper cathode. BHP Billiton is undertaking a pre-feasibility study into expanding annual production capacity to about 15,000 tonnes of uranium and 500,000 tonnes copper. Subject to successful completion of the pre-feasibility study and a final feasibility study, construction of the expansion could begin by early 2009, with the expanded production capacity being commissioned in 2013. The resource estimate has been significantly increased by drilling of the so-far undeveloped southern section of the orebody. Current planning indicates that this section could be mined by open pit. Ore is at depth and extends from 350 metres to about 1000 metres below surface. The existing operations facilities at Olympic Dam comprise an underground mine, and a mineral processing plant and associated infrastructure which would be expanded to support expanded mining. Major items of infrastructure could include a new powerline, water pipeline and associated coastal desalination plant, a rail link to Olympic Dam from the existing national network and further development of the Roxby Downs township (current population 4,000). The operation is regulated by an Indenture Agreement with the South Australian Government. To enable the expansion to proceed, the Indenture Agreement will be renegotiated. The operation is also regulated by the Federal Government. An Environmental Impact Statement is being developed to secure the necessary State and Federal approvals. A land access agreement is being negotiated with indigenous groups. Plans for

  2. Water supply as a constraint on transmission expansion planning in the Western interconnection

    Science.gov (United States)

    Tidwell, Vincent C.; Bailey, Michael; Zemlick, Katie M.; Moreland, Barbara D.

    2016-12-01

    Consideration of water supply in transmission expansion planning (TEP) provides a valuable means of managing impacts of thermoelectric generation on limited water resources. Toward this opportunity, thermoelectric water intensity factors and water supply availability (fresh and non-fresh sources) were incorporated into a recent TEP exercise conducted for the electric interconnection in the Western United States. The goal was to inform the placement of new thermoelectric generation so as to minimize issues related to water availability. Although freshwater availability is limited in the West, few instances across five TEP planning scenarios were encountered where water availability impacted the development of new generation. This unexpected result was related to planning decisions that favored the development of low water use generation that was geographically dispersed across the West. These planning decisions were not made because of their favorable influence on thermoelectric water demand; rather, on the basis of assumed future fuel and technology costs, policy drivers and the topology of electricity demand. Results also projected that interconnection-wide thermoelectric water consumption would increase by 31% under the business-as-usual case, while consumption would decrease by 42% under a scenario assuming a low-carbon future. Except in a few instances, new thermoelectric water consumption could be accommodated with less than 10% of the local available water supply; however, limited freshwater supplies and state-level policies could increase use of non-fresh water sources for new thermoelectric generation. Results could have been considerably different if scenarios favoring higher-intensity water use generation technology or potential impacts of climate change had been explored. Conduct of this exercise highlighted the importance of integrating water into all phases of TEP, particularly joint management of decisions that are both directly (e.g., water

  3. Library Space: Assessment and Planning through a Space Utilization Study.

    Science.gov (United States)

    Prentice, Katherine A; Argyropoulos, Erica K

    2018-01-01

    The objective of this article is to describe the recent space and furniture utilization study conducted through direct observation at the small, academic-centered Schusterman Library. Student workers from the library's reference desk monitored two semesters of use and went on to observe a third semester after electrical power upgrades were installed. Extensive use details were collected about where library patrons sat during which parts of the day, and certain areas of the library were ultimately identified as much more active than others. Overall, the information gathered proved useful to library planning and will be valuable to future space initiatives. This article further demonstrates feasible means for any library to implement a similar study with minimal resources.

  4. Establishment of comprehensive promotion plan for utilization, research and development of radiation and radioisotopes

    International Nuclear Information System (INIS)

    Choi, Young Myung; Kim, H. J.; Ham, C. H.; Yang, M. H.; Chung, W. S.; Park, K. B.; Jin, J. H.; Song, H. S.; Nho, Y. C.; Byun, M. W.; Kim, J. R.; Han, H. S.; Chung, Y. S.; Yun, P. M.; Lee, H. Y.; Seo, K. W.; Chang, S. Y.; Kee, S. R.; Lhu, S. R.; Choi, Y. S.

    1997-05-01

    This study surveys state-of-art radiation/RI industries and research organizations and their activities. The major objective of the survey is to collect useful information on the status of these industries, discuss issues concerning radiation /RI utilization. We, therefore, send questionnaires to field workers engaged in RI industries and research organizations to feedback on real field issues and problems. Considering the specificity and diversity of the radiation / RI area, six sectors are set up for its promotion. Each sector includes status analysis, active promotion measures and implementation plans. Six areas are as follows; 1) systematic developments of radiation /RI utilization technologies covers technology development for industrial applications, technology development for agricultural applications, technology development for medical applications, development of RI and radiation generators, and expansion of infra-structure for enhancement of radiation / RI utilization, and fostering radiation science. 2) activation of radiation / RI indusries 3) rationalization of radiation / RI regulation 4) international cooperation, 5) manpower development 6) finance. (author). 14 refs., 34 tabs., 5 figs

  5. A decision support system for generation expansion planning in competitive electricity markets

    International Nuclear Information System (INIS)

    Pereira, Adelino J.C.; Saraiva, Joao Tome

    2010-01-01

    This paper describes an approach to address the generation expansion-planning problem in order to help generation companies to decide whether to invest on new assets. This approach was developed in the scope of the implementation of electricity markets that eliminated the traditional centralized planning and lead to the creation of several generation companies competing for the delivery of power. As a result, this activity is more risky than in the past and so it is important to develop decision support tools to help generation companies to adequately analyse the available investment options in view of the possible behavior of other competitors. The developed model aims at maximizing the expected revenues of a generation company while ensuring the safe operation of the power system and incorporating uncertainties related with price volatility, with the reliability of generation units, with the demand evolution and with investment and operation costs. These uncertainties are modeled by pdf functions and the solution approach is based on Genetic Algorithms. Finally, the paper includes a Case Study to illustrate the application and interest of the developed approach. (author)

  6. Optimizing Transmission Network Expansion Planning With The Mean Of Chaotic Differential Evolution Algorithm

    Directory of Open Access Journals (Sweden)

    Ahmed R. Abdelaziz

    2015-08-01

    Full Text Available This paper presents an application of Chaotic differential evolution optimization approach meta-heuristics in solving transmission network expansion planning TNEP using an AC model associated with reactive power planning RPP. The reliabilityredundancy of network analysis optimization problems implicate selection of components with multiple choices and redundancy levels that produce maximum benefits can be subject to the cost weight and volume constraints is presented in this paper. Classical mathematical methods have failed in handling non-convexities and non-smoothness in optimization problems. As an alternative to the classical optimization approaches the meta-heuristics have attracted lot of attention due to their ability to find an almost global optimal solution in reliabilityredundancy optimization problems. Evolutionary algorithms EAs paradigms of evolutionary computation field are stochastic and robust meta-heuristics useful to solve reliabilityredundancy optimization problems. EAs such as genetic algorithm evolutionary programming evolution strategies and differential evolution are being used to find global or near global optimal solution. The Differential Evolution Algorithm DEA population-based algorithm is an optimal algorithm with powerful global searching capability but it is usually in low convergence speed and presents bad searching capability in the later evolution stage. A new Chaotic Differential Evolution algorithm CDE based on the cat map is recommended which combines DE and chaotic searching algorithm. Simulation results and comparisons show that the chaotic differential evolution algorithm using Cat map is competitive and stable in performance with other optimization approaches and other maps.

  7. A decision support system for generation expansion planning in competitive electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Adelino J.C. [Departamento de Engenharia Electrotecnica, Instituto Superior de Engenharia de Coimbra, Instituto Politecnico de Coimbra, Rua Pedro Nunes, 3030-199 Coimbra (Portugal); Saraiva, Joao Tome [INESC Porto and Departamento de Engenharia Electrotecnica e Computadores, Faculdade de Engenharia da Universidade do Porto, Campus da FEUP, Rua Dr. Roberto Frias, 4200-465 Porto (Portugal)

    2010-07-15

    This paper describes an approach to address the generation expansion-planning problem in order to help generation companies to decide whether to invest on new assets. This approach was developed in the scope of the implementation of electricity markets that eliminated the traditional centralized planning and lead to the creation of several generation companies competing for the delivery of power. As a result, this activity is more risky than in the past and so it is important to develop decision support tools to help generation companies to adequately analyse the available investment options in view of the possible behavior of other competitors. The developed model aims at maximizing the expected revenues of a generation company while ensuring the safe operation of the power system and incorporating uncertainties related with price volatility, with the reliability of generation units, with the demand evolution and with investment and operation costs. These uncertainties are modeled by pdf functions and the solution approach is based on Genetic Algorithms. Finally, the paper includes a Case Study to illustrate the application and interest of the developed approach. (author)

  8. Incorporating environmental externalities into the capacity expansion planning: An Israeli case study

    International Nuclear Information System (INIS)

    Becker, Nir; Soloveitchik, David; Olshansky, Moshe

    2011-01-01

    Highlights: → Long term energy-environmental planning problems for the electricity sector. → Environmental considerations in the capacity expansion plan. → Modified version of WASP-IV as a multiple objective programming model. → Multi-objective analysis of trade-offs between costs and pollutants reduction. -- Abstract: In this paper we use the WASP-IV model and develop methodology to estimate the impact of several environmental externality costs on the electricity sector development plan. For this purpose, 22 cases were generated which were later on reduced to only seven non-dominated cases by considering this problem as a dynamic multiple objective programming model. The major impact of internalizing the external cost is on fuel use. In the electricity generation system more natural gas and less coal has been used. A cost benefit analysis (CBA) of three scenarios has been performed focusing on taxing only one pollutant while looking at its overall implication. The benefit cost ratio was about 4.5 while the net benefit was about 200 million USD (depending on the scenario). Multi-objective analysis among the different scenarios was carried in a dynamic setting. Seven scenarios appear in the non-dominated set. Out of them five appears in every year and those should have a higher weight placed on them by policy makers. Out of those five, two are a single tax on one pollutant. Thus, policy makers might want to consider a mixture of taxes but for the sake of simplicity can also use a simple one tax on a given pollutant.

  9. Optimal expansion planning of stand-alone systems with stochastic simulations

    Energy Technology Data Exchange (ETDEWEB)

    Hoese, Alejandro [Instituto de Energia Electrica (IEE), Universidad Nacional de San Juan, (Argentina)

    1997-12-31

    Stand-alone systems in the range of 1 kW - 10 MW are taking relevance in the new (global) liberal concept of energy market. State and private investors are becoming increasingly attention on the use of renewable for these systems, but it must be shown that these non-conventional solutions are competitive with the established conventional ones. The high investment costs and the technical and economic uncertainties coupled with the use of time-dependent energy sources are the mainly inhibiting factors for the decision agents to choose these systems instead of conventional ones. In the paper a new model for optimal expansion planning of hybrid stand-alone generating systems under consideration of uncertainties is presented. This model is at present in {sup d}evelopment state{sup .} Results already obtained in the first steps of this research are promising and some of them are here presented. [Espanol] Los sistemas autocontenidos en el rango de 1 Kw a 10 MW estan tomando importancia en el nuevo (global) concepto liberal del mercado de la energia. Inversionistas privados y del Estado estan poniendo mayor atencion en el uso de energias renovables para estos sistemas, pero debe mostrarse que estas soluciones no-convencionales son competitivas con las convencionales establecidas. Los altos costos de inversion y las incertidumbres tecnicas y economicas aunadamente con el uso de fuentes de energia dependientes del tiempo son los principales factores inhibidores de los factores de decision para escoger estos sistemas en lugar de los convencionales. En este articulo se presenta un nuevo modelo de planeacion de expansion optima de sistemas hibridos autocontenidos de generacion electrica bajo la consideracion de incertidumbres. Este modelo esta actualmente en {sup e}stado de desarrollo{sup .} Los resultados ya obtenidos en las primeras etapas de esta investigacion son prometedores y se presentan algunos de ellos.

  10. System network planning expansion using mathematical programming, genetic algorithms and tabu search

    International Nuclear Information System (INIS)

    Sadegheih, A.; Drake, P.R.

    2008-01-01

    In this paper, system network planning expansion is formulated for mixed integer programming, a genetic algorithm (GA) and tabu search (TS). Compared with other optimization methods, GAs are suitable for traversing large search spaces, since they can do this relatively rapidly and because the use of mutation diverts the method away from local minima, which will tend to become more common as the search space increases in size. GA's give an excellent trade off between solution quality and computing time and flexibility for taking into account specific constraints in real situations. TS has emerged as a new, highly efficient, search paradigm for finding quality solutions to combinatorial problems. It is characterized by gathering knowledge during the search and subsequently profiting from this knowledge. The attractiveness of the technique comes from its ability to escape local optimality. The cost function of this problem consists of the capital investment cost in discrete form, the cost of transmission losses and the power generation costs. The DC load flow equations for the network are embedded in the constraints of the mathematical model to avoid sub-optimal solutions that can arise if the enforcement of such constraints is done in an indirect way. The solution of the model gives the best line additions and also provides information regarding the optimal generation at each generation point. This method of solution is demonstrated on the expansion of a 10 bus bar system to 18 bus bars. Finally, a steady-state genetic algorithm is employed rather than generational replacement, also uniform crossover is used

  11. Optimal expansion planning of stand-alone systems with stochastic simulations

    Energy Technology Data Exchange (ETDEWEB)

    Hoese, Alejandro [Instituto de Energia Electrica (IEE), Universidad Nacional de San Juan, (Argentina)

    1998-12-31

    Stand-alone systems in the range of 1 kW - 10 MW are taking relevance in the new (global) liberal concept of energy market. State and private investors are becoming increasingly attention on the use of renewable for these systems, but it must be shown that these non-conventional solutions are competitive with the established conventional ones. The high investment costs and the technical and economic uncertainties coupled with the use of time-dependent energy sources are the mainly inhibiting factors for the decision agents to choose these systems instead of conventional ones. In the paper a new model for optimal expansion planning of hybrid stand-alone generating systems under consideration of uncertainties is presented. This model is at present in {sup d}evelopment state{sup .} Results already obtained in the first steps of this research are promising and some of them are here presented. [Espanol] Los sistemas autocontenidos en el rango de 1 Kw a 10 MW estan tomando importancia en el nuevo (global) concepto liberal del mercado de la energia. Inversionistas privados y del Estado estan poniendo mayor atencion en el uso de energias renovables para estos sistemas, pero debe mostrarse que estas soluciones no-convencionales son competitivas con las convencionales establecidas. Los altos costos de inversion y las incertidumbres tecnicas y economicas aunadamente con el uso de fuentes de energia dependientes del tiempo son los principales factores inhibidores de los factores de decision para escoger estos sistemas en lugar de los convencionales. En este articulo se presenta un nuevo modelo de planeacion de expansion optima de sistemas hibridos autocontenidos de generacion electrica bajo la consideracion de incertidumbres. Este modelo esta actualmente en {sup e}stado de desarrollo{sup .} Los resultados ya obtenidos en las primeras etapas de esta investigacion son prometedores y se presentan algunos de ellos.

  12. A capacity expansion planning model for integrated water desalination and power supply chain problem

    International Nuclear Information System (INIS)

    Saif, Y.; Almansoori, A.

    2016-01-01

    Highlights: • Water and power supply chain is considered by a discrete optimization model. • The model examines the capacity expansion and operation of the supply chain problem. • Renewable/alternative power technologies and carbon mitigation are considered. • A case study of Abu Dhabi in UAE is examined as an application of the model. - Abstract: Cogeneration of water and power in integrated cogeneration production plants is a common practice in the Middle East and North Africa (MENA) countries. There are several combinations of water desalination and power technologies which give significant adverse environmental impact. Renewable and alternative energy technologies have been recently proposed as alternative power production paths in the water and power sector. In this study, we examine the optimal capacity expansion of water and power infrastructure over an extended planning horizon. A generic mixed integer linear programming model is developed to assist in the decision making process on: (1) optimal installation of cogeneration expansion capacities; (2) optimal installation of renewable and alternative power plants; (3) optimal operation of the integrated water and power supply chain over large geographical areas. Furthermore, the model considers the installation of carbon capture methods in fossil-based power plants. A case study will be presented to illustrate the mathematical programming application for the Emirate of Abu Dhabi (AD) in the United Arab Emirates (UAE). The case study is solved reflecting different scenarios: base case scenario, integration of renewable and alternative technologies scenario, and CO_2 reduction targets scenario. The results show that increased carbon tax values up to 150 $/ton-CO_2 gives a maximum 3% cost increase for the supply chain net present value. The installation of carbon capture methods is not an economical solution due to its high operation energy requirements in the order of 370 kW h per ton of captured CO_2

  13. Planning the expansion of transmission with evolutionary programming; Planeacion de la expansion de transmision con programacion evolutiva

    Energy Technology Data Exchange (ETDEWEB)

    Ceciliano Meza, Jose Luis; Nieva Gomez, Rolando [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    A method of evolutionary programming for the planning of transmission networks in electrical power systems is presented. This is a whole problem mixed and nonlinear, with a combinatory nature that leads to a very large number of possible solutions for electrical systems of medium and large scale. The problem of transmission planning is described briefly and later it is formulated in mathematical terms. The proposed algorithm of evolutionary programming is applied to a large scale network that is representative of the Mexican electrical system. [Spanish] Se presenta un metodo de programacion evolutiva para la planeacion de redes de transmision en sistemas electricos de potencia. Este es un problema entero mixto y no lineal, con una naturaleza combinatoria que conduce a un numero muy grande de soluciones posibles para sistemas electricos de mediana y gran escala. Se describe brevemente el problema de planeacion de transmision y posteriormente se formula en terminos matematicos. El algoritmo propuesto de programacion evolutiva se aplica a una red electrica de gran escala que es representativa del sistema electrico Mexicano.

  14. An IR-Based Approach Utilizing Query Expansion for Plagiarism Detection in MEDLINE.

    Science.gov (United States)

    Nawab, Rao Muhammad Adeel; Stevenson, Mark; Clough, Paul

    2017-01-01

    The identification of duplicated and plagiarized passages of text has become an increasingly active area of research. In this paper, we investigate methods for plagiarism detection that aim to identify potential sources of plagiarism from MEDLINE, particularly when the original text has been modified through the replacement of words or phrases. A scalable approach based on Information Retrieval is used to perform candidate document selection-the identification of a subset of potential source documents given a suspicious text-from MEDLINE. Query expansion is performed using the ULMS Metathesaurus to deal with situations in which original documents are obfuscated. Various approaches to Word Sense Disambiguation are investigated to deal with cases where there are multiple Concept Unique Identifiers (CUIs) for a given term. Results using the proposed IR-based approach outperform a state-of-the-art baseline based on Kullback-Leibler Distance.

  15. Optimal planning for the sustainable utilization of municipal solid waste.

    Science.gov (United States)

    Santibañez-Aguilar, José Ezequiel; Ponce-Ortega, José María; Betzabe González-Campos, J; Serna-González, Medardo; El-Halwagi, Mahmoud M

    2013-12-01

    The increasing generation of municipal solid waste (MSW) is a major problem particularly for large urban areas with insufficient landfill capacities and inefficient waste management systems. Several options associated to the supply chain for implementing a MSW management system are available, however to determine the optimal solution several technical, economic, environmental and social aspects must be considered. Therefore, this paper proposes a mathematical programming model for the optimal planning of the supply chain associated to the MSW management system to maximize the economic benefit while accounting for technical and environmental issues. The optimization model simultaneously selects the processing technologies and their location, the distribution of wastes from cities as well as the distribution of products to markets. The problem was formulated as a multi-objective mixed-integer linear programing problem to maximize the profit of the supply chain and the amount of recycled wastes, where the results are showed through Pareto curves that tradeoff economic and environmental aspects. The proposed approach is applied to a case study for the west-central part of Mexico to consider the integration of MSW from several cities to yield useful products. The results show that an integrated utilization of MSW can provide economic, environmental and social benefits. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Reduction of CO{sub 2} emissions by means of expansion, information technological cross-linking and grid optimization of plans for the utilization of decentral, fluctuating and renewable energy in Germany; CO{sub 2}-Emissionsminderung durch Ausbau, informationstechnische Vernetzung und Netzoptimierung von Anlagen dezentraler, fluktuierender und erneuerbarer Energienutzung in Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Lanz, Marco; Fricke, Barbara; Anthrakidis, Anette [FH Aachen (DE). Solar-Institut Juelich

    2011-11-15

    in the grid and energy system; and - The potentials of possible CO{sub 2} emission abatements brought about by the interweaving and flexibilisation on the part of consumers and producers, on the one hand, and promotion of the expansion of decentralised power plant capacities on the other hand. (orig.)

  17. 76 FR 49841 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2011-08-11

    ... Commission-approved RTOs and ISOs. The Commission stated that it expected all non-public utility transmission... transmission planning processes that public utility transmission providers in regions outside of RTOs and ISOs...

  18. Increasing Brand Awareness Trough Utilization Of Social Media And Expansion Of Relevant Market Channels

    OpenAIRE

    Nummelin, Aura

    2014-01-01

    The purpose of this thesis is to suggest ways to increase and develop the brand image of A. Ahlström Real Estate Ltd. The plan involves more effort put on B2B events, adding new service concepts, highlighting social media as a marketing tool and creating a new sales strategy for foreign customers. The goal is not to create a brand, but rather enhance and develop the already existing one. By implementing a variety of social media channels into their marketing strategy A. Ahlström Real...

  19. Optimal planning for the sustainable utilization of municipal solid waste

    Energy Technology Data Exchange (ETDEWEB)

    Santibañez-Aguilar, José Ezequiel [Chemical Engineering Department, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); Ponce-Ortega, José María, E-mail: jmponce@umich.mx [Chemical Engineering Department, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); Betzabe González-Campos, J. [Institute of Chemical and Biological Researches, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); Serna-González, Medardo [Chemical Engineering Department, Universidad Michoacana de San Nicolás de Hidalgo, Morelia, Michoacán 58060 (Mexico); El-Halwagi, Mahmoud M. [Chemical Engineering Department, Texas A and M University, College Station, TX 77843 (United States); Adjunct Faculty at the Chemical and Materials Engineering Department, Faculty of Engineering, King Abdulaziz University, P.O. Box 80204, Jeddah 21589 (Saudi Arabia)

    2013-12-15

    Highlights: • An optimization approach for the sustainable management of municipal solid waste is proposed. • The proposed model optimizes the entire supply chain network of a distributed system. • A case study for the sustainable waste management in the central-west part of Mexico is presented. • Results shows different interesting solutions for the case study presented. - Abstract: The increasing generation of municipal solid waste (MSW) is a major problem particularly for large urban areas with insufficient landfill capacities and inefficient waste management systems. Several options associated to the supply chain for implementing a MSW management system are available, however to determine the optimal solution several technical, economic, environmental and social aspects must be considered. Therefore, this paper proposes a mathematical programming model for the optimal planning of the supply chain associated to the MSW management system to maximize the economic benefit while accounting for technical and environmental issues. The optimization model simultaneously selects the processing technologies and their location, the distribution of wastes from cities as well as the distribution of products to markets. The problem was formulated as a multi-objective mixed-integer linear programing problem to maximize the profit of the supply chain and the amount of recycled wastes, where the results are showed through Pareto curves that tradeoff economic and environmental aspects. The proposed approach is applied to a case study for the west-central part of Mexico to consider the integration of MSW from several cities to yield useful products. The results show that an integrated utilization of MSW can provide economic, environmental and social benefits.

  20. Optimal planning for the sustainable utilization of municipal solid waste

    International Nuclear Information System (INIS)

    Santibañez-Aguilar, José Ezequiel; Ponce-Ortega, José María; Betzabe González-Campos, J.; Serna-González, Medardo; El-Halwagi, Mahmoud M.

    2013-01-01

    Highlights: • An optimization approach for the sustainable management of municipal solid waste is proposed. • The proposed model optimizes the entire supply chain network of a distributed system. • A case study for the sustainable waste management in the central-west part of Mexico is presented. • Results shows different interesting solutions for the case study presented. - Abstract: The increasing generation of municipal solid waste (MSW) is a major problem particularly for large urban areas with insufficient landfill capacities and inefficient waste management systems. Several options associated to the supply chain for implementing a MSW management system are available, however to determine the optimal solution several technical, economic, environmental and social aspects must be considered. Therefore, this paper proposes a mathematical programming model for the optimal planning of the supply chain associated to the MSW management system to maximize the economic benefit while accounting for technical and environmental issues. The optimization model simultaneously selects the processing technologies and their location, the distribution of wastes from cities as well as the distribution of products to markets. The problem was formulated as a multi-objective mixed-integer linear programing problem to maximize the profit of the supply chain and the amount of recycled wastes, where the results are showed through Pareto curves that tradeoff economic and environmental aspects. The proposed approach is applied to a case study for the west-central part of Mexico to consider the integration of MSW from several cities to yield useful products. The results show that an integrated utilization of MSW can provide economic, environmental and social benefits

  1. Water Utility Planning for an Emergency Drinking Water Supply

    Science.gov (United States)

    Reviews roles and responsibilities among various levels of government regarding emergency water supplies and seeks to encourage collaboration and partnership regarding emergency water supply planning.

  2. A multiyear DG-incorporated framework for expansion planning of distribution networks using binary chaotic shark smell optimization algorithm

    International Nuclear Information System (INIS)

    Ahmadigorji, Masoud; Amjady, Nima

    2016-01-01

    In this paper, a new model for MEPDN (multiyear expansion planning of distribution networks) is proposed. By solving this model, the optimal expansion scheme of primary (i.e. medium voltage) distribution network including the reinforcement pattern of primary feeders as well as location and size of DG (distributed generators) during an ascertained planning period is determined. Furthermore, the time-based feature of proposed model allows it to specify the investments/reinforcements time (i.e. year). Moreover, a minimum load shedding-based analytical approach for optimizing the network's reliability is introduced. The associated objective function of proposed model is minimizing the total investment and operation costs. To solve the formulated MEPDN model as a complex multi-dimensional optimization problem, a new evolutionary algorithm-based solution method called BCSSO (Binary Chaotic Shark Smell Optimization) is presented. The effectiveness of the proposed MEPDN model and solution approach is illustrated by applying them on two widely-used test cases including 12-bus and 33-bus distribution network and comparing the acquired results with the results of other solution methods. - Highlights: • A multiyear expansion planning model for distribution network is presented. • A new evolutionary algorithm-based solution approach is proposed. • A minimum load shedding-based analytical method for EENS minimization is suggested. • The efficacy of the proposed solution approach is broadly investigated.

  3. The affordable care act and family planning services: the effect of optional medicaid expansion on safety net programs.

    Science.gov (United States)

    Lanese, Bethany G; Oglesby, Willie H

    2016-01-01

    Title X of the Public Health Service Act provides funding for a range of reproductive health services, with a priority given to low-income persons. Now that many of these services are provided to larger numbers of people with low-income since the passage of the Affordable Care Act and Medicaid expansion, questions remain on the continued need for the Title X program. The current project highlights the importance of these safety net programs. To help inform this policy issue, research was conducted to examine the revenue and service changes for Title X per state and compare those findings to the states' Medicaid expansion and demographics. The dataset include publicly available data from 2013 and 2014 Family Planning Annual Reports (FPAR). Paired samples differences of means t-tests were then used to compare the means of family planning participation rates for 2013 and 2014 across the different categories for Medicaid expansion states and non-expansion states. The ACA has had an impact on Title X services, but the link is not as direct as previously thought. The findings indicate that all states' Title X funded clinics lost revenue; however, expansion states fared better than non-expansion states. While the general statements from the FPAR National surveys certainly are supported in that Title X providers have decreased in number and scope of services, which has led to the decrease in total clients, these variations are not evenly applied across the states. The ACA has very likely had an impact on Title X services, but the link is not as obvious as previously thought. Title X funded clinics have helped increase access to health insurance at a greater rate in expansion states than non-expansion states. There was much concern from advocates that with the projected increased revenue from Medicaid and private insurance, that Title X programs could be deemed unnecessary. However, this revenue increase has yet to actually pan out. Title X still helps fill a much needed

  4. Illinois statewide gas utility plan, 1993-2002. Volume 1. Executive summary

    International Nuclear Information System (INIS)

    1992-12-01

    The second Illinois Statewide Natural Gas Utility Plan is a continuation of the Least-Cost Planning effort introduced by the Public Utilities Act of 1986. The purpose of the Plan, like its predecessor, is to provide a framework and a set of policies which will allow and encourage local distribution companies to develop least-cost plans consistent with the goals of the Act: to provide efficient, environmentally sound, reliable, and equitable public utility service at the least possible cost. The Plan assesses natural gas demand and supply under five scenarios for the period 1993-2002. Key issues related to the development of least-cost natural gas plans are identified, and policies for addressing the issues are developed. The rationale and potential for natural gas demand side management (DSM) programs and policies are explored, and recommendations made with respect to utility DSM capability-building and DSM cost-recovery

  5. Analysis and planning of the utilization of nuclear power plants

    International Nuclear Information System (INIS)

    Skvarka, P.

    1985-01-01

    The utilization coefficient as one of the characteristics of availability of nuclear power plants and the operation results (like maximum power, block number, and electric energy generation) are investigated by different statistic methods for several nuclear power plants with PWR type reactors and compared with those of WWER 440-type reactors. By means of linear many-parameter regression analysis the utilization coefficient is studied in dependence on block power and time after reactor commissioning. Forecastings of mean utilization coefficients are presented for the power of WWER 1000-type reactors

  6. Factors influencing utilization of Natural Family Planning among ...

    African Journals Online (AJOL)

    -10 children. This means they did not know what impact large families will have on the poverty stricken households. There is some ignorance about NFP methods. They are more used to artificial harmful methods of Family Planning. Therefore ...

  7. Electric Utility Generating Units: Repealing the Clean Power Plan

    Science.gov (United States)

    The Clean Power Plan established emission guidelines for states to follow in limiting carbon dioxide (CO2) emissions from existing power plants. EPA is proposing to repeal the CPP and rescind the accompanying legal memorandum.

  8. Decenal plan of electric energy expansion - 2006-2015; Plano decenal de expansao de energia eletrica - 2006-2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This report is divided into seven chapters and presents: 1) Introduction - a brief description of the institutional context of the study and the decenal planning role in this context; 2) electric power market - the evolution of market and economy conjuncture of electric power and the basic premises for the market projections, including the considered macroeconomic scenery description; 3) electric power generation - considered premises, methodology and criteria for the formulation and adjustment of generation expansion alternatives of electric power; 4) electric power transmission - main aspects which guided the evolution of the interlinked system reference configuration in the decenal period and a description of the main result of transmission system expansion analysis, consolidated by SIN geoelectric region and by each state of these regions; 5) socioenvironmental analysis - adopted methodology and the results of the socioenvironmental analysis for the foreseen business in the decenal horizon; 6) expansion indicators of the electric system - synthesizes the main indicators referring to the decenal period as far the market evolution, generation expansion and transmission is concerned; 7)bibliographic references.

  9. Current NASA Plans for Mars In Situ Resource Utilization

    Science.gov (United States)

    Sanders, Gerald

    2018-01-01

    The presentation is to provide relevant information to the NASA funded Center for the Utilization of Biological Engineering in Space (CUBES) Institute. The presentation cover the following: 1) What is In Situ Resource Utilization (ISRU), 2) What are the resources of interest at the Moon and Mars, 3) ISRU-related mission requirements and ISRU economics, 4) Challenges and Risk for ISRU, 5) Concept of Operation for Mars ISRU Systems, 6) Current State of the Art (SOA) in ISRU, and 7) Current ISRU development and mission status.

  10. Planning the expansion of electrical transmission networks with evolutionary programming; Planeacion de la expansion de redes de transmision electrica con programacion evolucionaria

    Energy Technology Data Exchange (ETDEWEB)

    Ceciliano Meza, Jose Luis

    1997-12-31

    In this work it is presented for the first time in the literature the solution of the problem of the planning the expansion of an electrical transmission network (PERTE) with the use of the Evolutionary Programming. The evolutionary programming is a stochastic method of optimization with similar characteristics to the generic algorithms, but different. During the development of this work it is shown what each one of these two heuristic methods of optimization consist of. Additionally, the main characteristics of other two heuristic methods known in the literature are described (Tabu Searching and Simulated Annealing). These two methods together with the genetic algorithms and decomposition of Benders have also been used to solve the problem of planning PERTE. The operation of the proposed algorithm of evolutionary programming was tested in two networks of electrical transmission. The first case of test is a system which is known in the literature. The second case is a representative system of the electrical transmission network of Central America. The results obtained improve all the results shown when applying different heuristic methods of optimization (genetic algorithms, simulated annealing and Tabu searching) to solve the same problem. [Espanol] En este trabajo se presenta por primera vez en la literatura, la solucion del problema de la planeacion de expansion de una red de transmision electrica (PERTE) con el uso de la Programacion Evolucionaria. La programacion evolucionaria es un metodo estocastico de optimizacion con caracteristicas similares a los algoritmos geneticos, pero diferente. Durante el desarrollo de este trabajo se muestra en que consiste cada uno de estos dos metodos heuristicos de optimizacion. Ademas, se describen las caracteristicas principales de otros dos metodos heuristicos conocidos en la literatura (busqueda Tabu y Recorrido Simulado). Estos dos metodos juntos con los algoritmos geneticos y descomposicion de Benders tambien han sido

  11. Problems faced with the use of the WASP model in least cost and alternative electricity system expansion planning in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Breazu, F [Institute of Power Studies and Design, Bucharest (Romania)

    1997-09-01

    Romanian experience with the use of IAEA planning methodologies was effectively initiated in 1989 with the launching of a Technical Cooperation project of the IAEA for the study of the energy demand and optimal expansion plans for the electricity generation system. The experience gathered during this project was crucial for the Romanian experts who conducted the studies. As a results, now Romania has a team of well trained experts in the use of the IAEA planning models. This paper describes the principal problems faced by Romanian planners in the use of these models with emphasis on the WASP package. Suggestions for future enhancements of the package are also part of this report. (author). 5 figs.

  12. Utilization of family planning services in a Nigerian tertiary hospital ...

    African Journals Online (AJOL)

    Context: Family planning is an integral part of maternal health as its uptake is a significant factor in the reduction of maternal mortality and in ensuring positive child health outcomes. Objectives: To describe prevalence and pattern of contraceptive use, and identify reasons for discontinuation among women accessing family ...

  13. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    Science.gov (United States)

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  14. PV as a core element of utility business plans

    International Nuclear Information System (INIS)

    Osborn, Don

    2000-01-01

    The author expounds the advantages and rationale for utility PV (photovoltaics) business strategies and discusses various initiatives being taken by some companies in the US. It is claimed that in perhaps 5-12 years the photovoltaics price will be competing with retail electricity and customer-owned utilities should be in a position to offer photovoltaics as an option rather than concede that business to someone else. Five specific reasons for investing in PVs are given and the message is that if you are not involved then get involved. The author describes his own company's commitments to PV and suggests that regulators and legislators should appreciate the long term interests of the ratepayer in that investment now in higher cost PV technology will lead to greater cost reductions in the future

  15. Payload Crew Training Complex (PCTC) utilization and training plan

    Science.gov (United States)

    Self, M. R.

    1980-01-01

    The physical facilities that comprise the payload crew training complex (PCTC) are described including the host simulator; experiment simulators; Spacelab aft flight deck, experiment pallet, and experiment rack mockups; the simulation director's console; payload operations control center; classrooms; and supporting soft- and hardware. The parameters of a training philosophy for payload crew training at the PCTC are established. Finally the development of the training plan is addressed including discussions of preassessment, and evaluation options.

  16. Practical method for generation expansion planning based on the dynamic programming. Dynamic programming ni motozuku dengen keikaku shuho

    Energy Technology Data Exchange (ETDEWEB)

    Tanabe, R.; Yasuda, K.; Yokoyama, R. (Tokyo Metropolitan Univ., Tokyo (Japan))

    1992-05-20

    To supply cheap, high-reliable and a planty of the electricity is an important task of the electric supply system because the requirement for the electricity is rapidly increased in Japan. In order to solve this problem, the authors of the paper are developing a most suitable practical method based on algorithm, according to which the generation expansion planning is divided into two problems: the optimal generation mix and the optimal generation construction process and the two problems are solved respectively. But there are some bad points in the method, for example, there are only approximative practical restriction of the capacity of single machine and the existing electric supply etc., because the optimal generation mix is determined on the basis of non-linear planning. So, in the present paper, the electric supply support system is practically constructed while proposing an unified generation expansion planning based on the dynamic programming that is possible to consider these restrictions strictly and the usefullness of the method is inspected. 12 refs., 7 figs., 5 tabs.

  17. Strategic and Operational Plan Implementation of Seaports (Utilization Jeddah Port

    Directory of Open Access Journals (Sweden)

    Akram Elentably

    2015-12-01

    Full Text Available The Port of Jeddah (Port released the initial version of this Strategic Plan in 2006. It was developed by Port staff, along with input, as a five-year rolling plan designed to guide the Port’s future development while keeping in mind the needs of our tenants, local community members and stakeholders, and the nation. This is the second update to the Strategic Plan since its initial release. While the Port’s overarching principles – commitment to environmental stewardship, addressing tenant needs, goods movement, economic development, and security – have remained largely unchanged, it is important for us to adapt our strategies to meet the challenges of an ever changing local and global environment. The Port is among the world’s premier ports and is a critical hub for global trade. This prominence brings with it responsibilities and expectations for the highest possible standards for efficiency, safety and security, and environmental leadership. The Port is the nation’s busiest container port and part of the world’s busiest port complex, handling 3.7 million twenty-foot equivalent units in 2013. Global trade and goods movement is Western kingdom of Saudi Arabia’s strongest industries in terms of jobs and economic activity. The Port of Jeddah powers these industries, handling almost more than a quarter of the cargo that enters the kingdom of Saudi Arabia annually. Through the Port’s activities, a lot of jobs are created in western kingdom of Saudi Arabia and over five hundred thousand nationwide. In order to maintain our position among the world’ the kingdom of Saudi Arabia premier ports, the Port is continually addressing the demands for providing modern and efficient cargo handling terminals as well as transportation and infrastructure projects. Protecting one of the nation’s most vital economic hubs is also an ongoing challenge. Finally, promoting a sustainable “grow green” philosophy and ensuring that we are the leader

  18. Preparatory Work for a Scenario-Based Electricity Expansion Plan for North Korea after Hypothetical Reunification using WASP-IV

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo; Chang, Choong Koo [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is noteworthy that North Korean government itself has demanded other parties' cooperation in the field of power sector as the top priority to deal with North Korean own economic issues. In this light, the researcher consider that how to build power capacity in North Korean area after reunification needs to be studied with priority. A scenario-based approach is being adopted, and three scenarios are proposed: Scenario increasing capacity at 2.4% annual rate, Imitating South Korean electricity expansion history, and reaching 80% of South Korean Annual Peak Load in 35 years. In order to carry out the research, WASP-IV (Wien Automation System Planning-IV) code developed by IAEA is, with reasonable assumptions, being executed. Annual Peak Load prediction for each scenario, load duration curve, and existing power generating facilities in North Korea are presented herein. This research is being conducted as a preparatory work for the further study. IAEA's WASP-IV is adopted for a scenario-based electricity expansion plan for North Korea after hypothetical reunification between Koreas. Input data including Annual Peak Load, load duration curve, and existing facilities are built and presented. Additional future research includes inputting candidate plants data, cost data such as construction period, operation and maintenance costs, and fuel costs, as well as decommissioning of aged power plants in North Korea to complete WASP-IV execution. Assuming reunification, electricity expansion plan would need to integrate North and South Koreas demands and facilities. However, this research narrows down its scope to North Korean demand and facilities only. Such integrated simulation could be the topic for the later research. This work was supported by the 2014 Research Fund of the KINGS.

  19. Preparatory Work for a Scenario-Based Electricity Expansion Plan for North Korea after Hypothetical Reunification using WASP-IV

    International Nuclear Information System (INIS)

    Kim, Young Joo; Chang, Choong Koo

    2014-01-01

    It is noteworthy that North Korean government itself has demanded other parties' cooperation in the field of power sector as the top priority to deal with North Korean own economic issues. In this light, the researcher consider that how to build power capacity in North Korean area after reunification needs to be studied with priority. A scenario-based approach is being adopted, and three scenarios are proposed: Scenario increasing capacity at 2.4% annual rate, Imitating South Korean electricity expansion history, and reaching 80% of South Korean Annual Peak Load in 35 years. In order to carry out the research, WASP-IV (Wien Automation System Planning-IV) code developed by IAEA is, with reasonable assumptions, being executed. Annual Peak Load prediction for each scenario, load duration curve, and existing power generating facilities in North Korea are presented herein. This research is being conducted as a preparatory work for the further study. IAEA's WASP-IV is adopted for a scenario-based electricity expansion plan for North Korea after hypothetical reunification between Koreas. Input data including Annual Peak Load, load duration curve, and existing facilities are built and presented. Additional future research includes inputting candidate plants data, cost data such as construction period, operation and maintenance costs, and fuel costs, as well as decommissioning of aged power plants in North Korea to complete WASP-IV execution. Assuming reunification, electricity expansion plan would need to integrate North and South Koreas demands and facilities. However, this research narrows down its scope to North Korean demand and facilities only. Such integrated simulation could be the topic for the later research. This work was supported by the 2014 Research Fund of the KINGS

  20. Incorporating a multi-criteria decision procedure into the combined dynamic programming/production simulation algorithm for generation expansion planning

    International Nuclear Information System (INIS)

    Yang, H.T.; Chen, S.L.

    1989-01-01

    A multi-objective optimization approach to generation expansion planning is presented. The approach is designed by adding a new multi-criteria decision (MCD) procedure to the conventional algorithm which combines dynamic programming with production simulation method. The MCD procedure can help decision makers weight the relative importance of multiple attributes associated with the decision alternatives, and find the near-best compromise solution efficiently at each optimization step of the conventional algorithm. Practical application of proposed approach to feasibility evaluation of the fourth nuclear power plant of Tawian is also presented, demonstrating the effectiveness and limitations of the approach

  1. Extended gamma sources modelling using multipole expansion: Application to the Tunisian gamma source load planning

    International Nuclear Information System (INIS)

    Loussaief, Abdelkader

    2007-01-01

    In this work we extend the use of multipole moments expansion to the case of inner radiation fields. A series expansion of the photon flux was established. The main advantage of this approach is that it offers the opportunity to treat both inner and external radiation field cases. We determined the expression of the inner multipole moments in both spherical harmonics and in cartesian coordinates. As an application we applied the analytical model to a radiation facility used for small target irradiation. Theoretical, experimental and simulation studies were performed, in air and in a product, and good agreement was reached.Conventional dose distribution study for gamma irradiation facility involves the use of isodose maps. The establishment of these maps requires the measurement of the absorbed dose in many points, which makes the task expensive experimentally and very long by simulation. However, a lack of points of measurement can distort the dose distribution cartography. To overcome these problems, we present in this paper a mathematical method to describe the dose distribution in air. This method is based on the multipole expansion in spherical harmonics of the photon flux emitted by the gamma source. The determination of the multipole coefficients of this development allows the modeling of the radiation field around the gamma source. (Author)

  2. Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)

    Energy Technology Data Exchange (ETDEWEB)

    Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

    2011-11-01

    This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

  3. Playing the odds: Climate change risks transform utility plans

    Energy Technology Data Exchange (ETDEWEB)

    Tennis, M.W. [Union of Concerned Scientists, Cambridge, MA (United States)

    1996-12-31

    Cost and uncertainty analyses conducted jointly by the Union of Concerned Scientists and World Resource Institute regarding climate change policy and regulations are presented in this paper. A utility model was developed to help determine whether action was required in the near term by the electric industry and policy makers to reduce carbon emissions. The cost and carbon dioxide emissions resulting from four case studies are tabulated. Analysis of the results shows that explicit consideration of climate change uncertainty can provide an economic justification for investing in low carbon resources at above market costs. A number of specific recommendations are made in the paper. 2 figs., 3 tabs.

  4. State Performance-Based Regulation Using Multiyear Rate Plans for U.S. Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Lowry, Mark Newton [Pacific Economics Group Research LLC (United States); Makos, Matt [Pacific Economics Group Research LLC (United States); Deason, Jeff [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-07-31

    Electric utilities today must contain costs at a time when many need to modernize aging systems and all face major changes in technologies, customer preferences and competitive pressures.Most U.S. electric utility facilities are investor-owned, subject to rate and service regulation by state public utility commissions. Regulatory systems under which these utilities operate affect their performance and ability to meet these challenges. In this business environment, multiyear rate plans have some advantages over traditional rate regulation.The report focuses on key design issues and provides case studies of the multiyear rate plan approach, applicable to both vertically integrated and restructured states. Mark Newton Lowry and Matt Makos of Pacific Energy Group Research and Jeff Deason of Berkeley Lab authored the report; Lisa Schwartz, Berkeley Lab, was project manager and technical editor.The report is aimed primarily at state utility regulators and stakeholders in the state regulatory process. The multiyear rate approach also provides ideas on how to streamline oversight of public power utilities and rural electric cooperatives for their governing boards.Two key provisions of multiyear rate plans strengthen cost containment incentives and streamline regulation: 1. Reducing frequency of rate cases, typically to every four or five years 2. Using an attrition relief mechanism to escalate rates or revenue between rate cases to address cost pressures such as inflation and growth in number of customers, independently of the utility’s own cost Better utility performance can be achieved under well-designed multiyear rate plans while achieving lower regulatory costs. Benefits can be shared between utilities and their customers. But plans can be complex and involve significant changes in the regulatory system. Designing plans that stimulate utility performance without undue risk and share benefits fairly can be challenging.This report discusses the rationale for multiyear

  5. HTTR demonstration test plan for industrial utilization of nuclear heat

    International Nuclear Information System (INIS)

    Sato, Hiroyuki; Ohashi, Hirofumi; Yan, Xing L.; Kubo, Shinji; Nishihara, Tetsuo; Tachibana, Yukio; Inagaki, Yoshiyuki

    2014-09-01

    Japan Atomic Energy Agency has been conducting research and development with a central focus on the utilization of High Temperature engineering Test Reactor (HTTR), the first High Temperature Gas-cooled Reactor (HTGR) in Japan, towards the realization of industrial use of nuclear heat. Several studies have made on the integration of the HTTR with thermochemical iodine-sulfur process and steam methane reforming hydrogen production plant (H 2 plant) as well as helium gas turbine power conversion system. In addition, safety standards for coupling a H 2 plant to a nuclear facility has been investigated. Based on the past design information, the present study identified test items to be validated in the HTTR demonstration test to accomplish a formulation of safety requirement and design consideration for coupling a H 2 plant to a nuclear facility as well as confirmation of overall performance of helium gas turbine system. In addition, plant concepts for the heat utilization system to be connected with the HTTR are investigated. (author)

  6. Basic plan for nuclear power development and utilization in 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report presents specific measures to be carried out in 1987 to promote research, development and application of nuclear power. The first part deals with the strengthening of safety measures, centering on the improvement in regulation and administration for nuclear power safety; promotion of safety studies; improvement and strengthening of disaster prevention measures; improvement and strengthening of environmental activity surveys; improvement in exposure control measures for nuclear power operation workers; and establishment of the nuclear fuel cycle and safety in such activities as development of new reactors. The second part of the report addresses the promotion of nuclear power generation. Measures for this will be focused on the promotion of location of nuclear power plants and the development of advanced technology for light water reactors. The third part describes measures for establishing the nuclear fuel cycle, which cover the procurement of uranium resources; enrichment of uranium; reprocessing of spent fuel and utilization of plutonium and recovered uranium; and disposal of radioactive waste. Other parts presents measures to be carried out for the development of new power reactors; research on nuclear fusion; development of nuclear powered vessels; application of radiations; improvement in the infrastructure for nuclear power development and utilization; etc. (Nogami, K.)

  7. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Wiser, Ryan

    2005-08-10

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  8. SU-E-J-254: Utility of Pinnacle Dynamic Planning Module Utilizing Deformable Image Registration in Adaptive Radiotherapy

    International Nuclear Information System (INIS)

    Jani, S

    2014-01-01

    Purpose For certain highly conformal treatment techniques, changes in patient anatomy due to weight loss and/or tumor shrinkage can result in significant changes in dose distribution. Recently, the Pinnacle treatment planning system added a Dynamic Planning module utilizing Deformable Image Registration (DIR). The objective of this study was to evaluate the effectiveness of this software in adapting to altered anatomy and adjusting treatment plans to account for it. Methods We simulated significant tumor response by changing patient thickness and altered chin positions using a commercially-available head and neck (H and N) phantom. In addition, we studied 23 CT image sets of fifteen (15) patients with H and N tumors and eight (8) patients with prostate cancer. In each case, we applied deformable image registration through Dynamic Planning module of our Pinnacle Treatment Planning System. The dose distribution of the original CT image set was compared to the newly computed dose without altering any treatment parameter. Result was a dose if we did not adjust the plan to reflect anatomical changes. Results For the H and N phantom, a tumor response of up to 3.5 cm was correctly deformed by the Pinnacle Dynamic module. Recomputed isodose contours on new anatomies were within 1 mm of the expected distribution. The Pinnacle system configuration allowed dose computations resulting from original plans on new anatomies without leaving the planning system. Original and new doses were available side-by-side with both CT image sets. Based on DIR, about 75% of H and N patients (11/15) required a re-plan using new anatomy. Among prostate patients, the DIR predicted near-correct bladder volume in 62% of the patients (5/8). Conclusions The Dynamic Planning module of the Pinnacle system proved to be an accurate and useful tool in our ability to adapt to changes in patient anatomy during a course of radiotherapy

  9. Survey of state regulatory activities on least cost planning for gas utilities

    International Nuclear Information System (INIS)

    Goldman, C.A.; Hopkins, M.E.

    1991-04-01

    Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. Incorporating the concept of meeting customer energy service needs entails a recognition that customers' costs must be considered along with the utility's costs in the economic analysis of energy options. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. All state commissions were surveyed to assess the current status of gas planning and demand-side management and to identify significant regulatory issues faced by commissions during the next several years. The survey was to determine the extent to which they have undertaken least-cost planning for gas utilities. The survey included the following topics: (1) status of state PUC least-cost planning regulations and practices for gas utilities; (2) type and scope ofnatural gas DSM programs in effect, includeing fuel substitution; (3) economic tests and analysis methods used to evaluate DSM programs; (4) relationship between prudence reviews of gas utility purchasing practices and integrated resource planning; and (5) key regulatory issues facing gas utilities during the next five years. 34 refs., 6 figs., 10 tabs

  10. A bi-level programming for multistage co-expansion planning of the integrated gas and electricity system

    DEFF Research Database (Denmark)

    Zeng, Qing; Zhang, Baohua; Fang, Jiakun

    2017-01-01

    as the generation capacities, while the lower-level is formulated as an optimal economic dispatch under the operational constraints given by the upper-level decision. To solve the bi-level multi-stage programming problem, a hybrid algorithm is proposed combining the modified binary particle swarm optimization (BPSO...... power systems. The system operation is optimized and embedded in the planning horizon. A bi-level multi-stage programming problem is formulated to minimize the investment cost plus the operational cost. The upper-level optimizes the expansion plan and determines the network topology as well......) and the interior point method (IPM). The BPSO is used for the upper-level sub-problem, and the IPM is adopted for the lower-level sub-problem. Numerical case studies have been carried out on the practical gas and electricity transmission network in western Denmark. Simulation results demonstrate the effectiveness...

  11. Using Multiattribute Utility Theory as a Priority-Setting Tool in Human Services Planning.

    Science.gov (United States)

    Camasso, Michael J.; Dick, Janet

    1993-01-01

    The feasibility of applying multiattribute utility theory to the needs assessment and priority-setting activities of human services planning councils was studied in Essex County (New Jersey). Decision-making and information filtering processes are explored in the context of community planning. (SLD)

  12. Co-operative planning by utilities and local authorities. A solution to solve climate change?

    International Nuclear Information System (INIS)

    Schlenzing, C.; Steidle, T.

    2001-01-01

    Since the deregulation of German energy markets 1998 we can observe diverging planning interests and priorities of the local communities on one side and the local energy utilities on the other side. This seriously endangers the consensus in local energy planning achieved in the past which will be crucial in order to identify and implement effective greenhouse gas (GHG) mitigation strategies. This paper presents a co-operative planning approach which embeds systems analysis into a well structured communication, mediation and learning process for decision making. This process is supported by the cooperative modeling system MESAP, a software for energy and environmental planning, which integrates different energy models with an energy information system. This allows to combine traditional local energy planning with the more business oriented view of the utilities. The specific design of MESAP allows for a continuous 'sustainable' planning and monitoring similar to business tools for accounting and controlling in companies. (author)

  13. Wind as a utility-grade supply resource: A planning framework for the Pacific Northwest

    International Nuclear Information System (INIS)

    Johnson, M.S.; Litchfield, J.

    1993-12-01

    Many areas throughout the United States possess favorable wind resources that, as yet, remain undeveloped. This paper provides valuable information on the type of information developers can provide, utility interpretation of the information in regard to electric energy and capacity attributes, and wind resource characteristics of interest to utilities. The paper also reviews key utility planning contexts within which prospective wind resources may be evaluated

  14. Light Duty Utility Arm interface control document plan

    International Nuclear Information System (INIS)

    Engstrom, J.W.

    1994-01-01

    This document describes the interface control documents that will be used to identify and control interface features throughout all phases of the Light Duty Utility Arm (LDUA) development and design. After the system is built, delivered and installed in the Cold Test Facility and later at the tank farm, the Interface Control Documents can be used in maintaining the configuration control process. The Interface Control Document will consist of Interface Control Drawings and a data base directly tied to the Interface Control Drawings. The data base can be used as an index to conveniently find interface information. Design drawings and other text documents that contain interface information will appear in the database. The Interface Control Drawings will be used to document and control the data and information that define the interface boundaries between systems, subsystems and equipment. Also, the interface boundaries will define the areas of responsibility for systems and subsystems. The drawing will delineate and identify all the physical and functional interfaces that required coordination to establish and maintain compatibility between the co-functioning equipment, computer software, and the tank farm facilities. An appendix contains the Engineering interface control database system riser manual

  15. Light Duty Utility Arm interface control document plan

    Energy Technology Data Exchange (ETDEWEB)

    Engstrom, J.W.

    1994-12-27

    This document describes the interface control documents that will be used to identify and control interface features throughout all phases of the Light Duty Utility Arm (LDUA) development and design. After the system is built, delivered and installed in the Cold Test Facility and later at the tank farm, the Interface Control Documents can be used in maintaining the configuration control process. The Interface Control Document will consist of Interface Control Drawings and a data base directly tied to the Interface Control Drawings. The data base can be used as an index to conveniently find interface information. Design drawings and other text documents that contain interface information will appear in the database. The Interface Control Drawings will be used to document and control the data and information that define the interface boundaries between systems, subsystems and equipment. Also, the interface boundaries will define the areas of responsibility for systems and subsystems. The drawing will delineate and identify all the physical and functional interfaces that required coordination to establish and maintain compatibility between the co-functioning equipment, computer software, and the tank farm facilities. An appendix contains the Engineering interface control database system riser manual.

  16. Energy Resource Planning. Optimal utilization of energy resources

    International Nuclear Information System (INIS)

    Miclescu, T.; Domschke, W.; Bazacliu, G.; Dumbrava, V.

    1996-01-01

    For a thermal power plants system, the primary energy resources cost constitutes a significant percentage of the total system operational cost. Therefore a small percentage saving in primary energy resource allocation cost for a long term, often turns out to be a significant monetary value. In recent years, with a rapidly changing fuel supply situation, including the impact of energy policies changing, this area has become extremely sensitive. Natural gas availability has been restricted in many areas, coal production and transportation cost have risen while productivity has decreased, oil imports have increased and refinery capacity failed to meet demand. The paper presents a mathematical model and a practical procedure to solve the primary energy resource allocation. The objectives is to minimise the total energy cost over the planning period subject to constraints with regards to primary energy resource, transportation and energy consumption. Various aspects of the proposed approach are discussed, and its application to a power system is illustrated.(author) 2 figs., 1 tab., 3 refs

  17. Using multiobjective tradeoff sets and Multivariate Regression Trees to identify critical and robust decisions for long term water utility planning

    Science.gov (United States)

    Smith, R.; Kasprzyk, J. R.; Balaji, R.

    2017-12-01

    In light of deeply uncertain factors like future climate change and population shifts, responsible resource management will require new types of information and strategies. For water utilities, this entails potential expansion and efficient management of water supply infrastructure systems for changes in overall supply; changes in frequency and severity of climate extremes such as droughts and floods; and variable demands, all while accounting for conflicting long and short term performance objectives. Multiobjective Evolutionary Algorithms (MOEAs) are emerging decision support tools that have been used by researchers and, more recently, water utilities to efficiently generate and evaluate thousands of planning portfolios. The tradeoffs between conflicting objectives are explored in an automated way to produce (often large) suites of portfolios that strike different balances of performance. Once generated, the sets of optimized portfolios are used to support relatively subjective assertions of priorities and human reasoning, leading to adoption of a plan. These large tradeoff sets contain information about complex relationships between decisions and between groups of decisions and performance that, until now, has not been quantitatively described. We present a novel use of Multivariate Regression Trees (MRTs) to analyze tradeoff sets to reveal these relationships and critical decisions. Additionally, when MRTs are applied to tradeoff sets developed for different realizations of an uncertain future, they can identify decisions that are robust across a wide range of conditions and produce fundamental insights about the system being optimized.

  18. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    International Nuclear Information System (INIS)

    1995-01-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  19. Long-term power generation expansion planning with short-term demand response: Model, algorithms, implementation, and electricity policies

    Science.gov (United States)

    Lohmann, Timo

    Electric sector models are powerful tools that guide policy makers and stakeholders. Long-term power generation expansion planning models are a prominent example and determine a capacity expansion for an existing power system over a long planning horizon. With the changes in the power industry away from monopolies and regulation, the focus of these models has shifted to competing electric companies maximizing their profit in a deregulated electricity market. In recent years, consumers have started to participate in demand response programs, actively influencing electricity load and price in the power system. We introduce a model that features investment and retirement decisions over a long planning horizon of more than 20 years, as well as an hourly representation of day-ahead electricity markets in which sellers of electricity face buyers. This combination makes our model both unique and challenging to solve. Decomposition algorithms, and especially Benders decomposition, can exploit the model structure. We present a novel method that can be seen as an alternative to generalized Benders decomposition and relies on dynamic linear overestimation. We prove its finite convergence and present computational results, demonstrating its superiority over traditional approaches. In certain special cases of our model, all necessary solution values in the decomposition algorithms can be directly calculated and solving mathematical programming problems becomes entirely obsolete. This leads to highly efficient algorithms that drastically outperform their programming problem-based counterparts. Furthermore, we discuss the implementation of all tailored algorithms and the challenges from a modeling software developer's standpoint, providing an insider's look into the modeling language GAMS. Finally, we apply our model to the Texas power system and design two electricity policies motivated by the U.S. Environment Protection Agency's recently proposed CO2 emissions targets for the

  20. High efficiency, quasi-instantaneous steam expansion device utilizing fossil or nuclear fuel as the heat source

    International Nuclear Information System (INIS)

    Claudio Filippone

    1999-01-01

    Thermal-hydraulic analysis of a specially designed steam expansion device (heat cavity) was performed to prove the feasibility of steam expansions at elevated rates for power generation with higher efficiency. The steam expansion process inside the heat cavity greatly depends on the gap within which the steam expands and accelerates. This system can be seen as a miniaturized boiler integrated inside the expander where steam (or the proper fluid) is generated almost instantaneously prior to its expansion in the work-producing unit. Relatively cold water is pulsed inside the heat cavity, where the heat transferred causes the water to flash to steam, thereby increasing its specific volume by a large factor. The gap inside the heat cavity forms a special nozzle-shaped system in which the fluid expands rapidly, accelerating toward the system outlet. The expansion phenomenon is the cause of ever-increasing fluid speed inside the cavity system, eliminating the need for moving parts (pumps, valves, etc.). In fact, the subsequent velocity induced by the sudden fluid expansion causes turbulent conditions, forcing accelerating Reynolds and Nusselt numbers which, in turn, increase the convective heat transfer coefficient. When the combustion of fossil fuels constitutes the heat source, the heat cavity concept can be applied directly inside the stator of conventional turbines, thereby greatly increasing the overall system efficiency

  1. Managing carbon regulatory risk in utility resource planning: Current practices in the Western United States

    International Nuclear Information System (INIS)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-01-01

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by 15 electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without federal climate regulation in the US, the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of US electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  2. Planning model for the expansion of the electrical generation system with risk demarcation criteria; Modelo para la planificacion de la expansion del sistema electrico de generacion con criterios de acotamiento de riesgo

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Galicia, Julio Alberto; Nieva Gomez, Rolando [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2009-07-01

    The general characteristics of a planning model for the electrical generation system expansion with risk demarcation criteria, as well as the main results of a representative study case of the Mexican Electrical System is presented. The model is based on a methodology of multiannual optimization for the generation expansion plans determination. In this context, every expansion plan defines the technology type to be installed, as well as the installation year, unit size and its location within a regional electric network. For this purpose, the model considers an interregional representation of the system identifying the necessary reinforcements to the capacity of the interregional connections. It also incorporates a Demarcation of Risk module that considers the uncertainty of the future scenarios of fuels prices to generate a set of expansion plans, among which includes the following: a) For every future of the fuel prices: the plan that diminishes the present value of the total cost (investment plus production). b) The plan that diminishes the economic risk derived from the uncertainty in the future of the fuel prices. c) A subgroup of expansion plans that are located in the efficient borders of decision, under the context of three criteria of interest: the economic risk, the investment cost of and the total cost in the future considered of greater relevance. [Spanish] Se presentan las caracteristicas generales de un modelo de planificacion de la expansion del sistema electrico de generacion con criterios de acotamiento de riesgo, asi como los principales resultados de un caso de estudio representativo del Sistema Electrico Mexicano. El modelo se basa en una metodologia de optimacion multi-anual para la determinacion de planes de expansion de la generacion. En este contexto, cada plan de expansion define el tipo de tecnologia que debera instalarse, asi como el ano de instalacion, el tamano de la unidad y su localizacion dentro de una red electrica regional. Para

  3. A planning and analysis framework for evaluating distributed generation and utility strategies

    International Nuclear Information System (INIS)

    Ault, Graham W.

    2000-01-01

    The numbers of smaller scale distributed power generation units connected to the distribution networks of electricity utilities in the UK and elsewhere have grown significantly in recent years. Numerous economic and political drivers have stimulated this growth and continue to provide the environment for future growth in distributed generation. The simple fact that distributed generation is independent from the distribution utility complicates planning and operational tasks for the distribution network. The uncertainty relating to the number, location and type of distributed generating units to connect to the distribution network in the future makes distribution planning a particularly difficult activity. This thesis concerns the problem of distribution network and business planning in the era of distributed generation. A distributed generation strategic analysis framework is proposed to provide the required analytical capability and planning and decision making framework to enable distribution utilities to deal effectively with the challenges and opportunities presented to them by distributed generation. The distributed generation strategic analysis framework is based on the best features of modern planning and decision making methodologies and facilitates scenario based analysis across many utility strategic options and uncertainties. Case studies are presented and assessed to clearly illustrate the potential benefits of such an approach to distributed generation planning in the UK electricity supply industry. (author)

  4. Expansion planning of the electric systems in a competitive environment context; O planejamento da expansao dos sistemas eletricos no contexto de um ambiente competitivo

    Energy Technology Data Exchange (ETDEWEB)

    Haffner, Sergio Luis

    2000-07-01

    An integrated dynamic expansion planning model of electric energy systems model is proposed. Such model can be used by an independent structure of planning, compatible with the current competitive environment of the electric industry. The investments in generation and transmission are obtained simultaneously, taking into account a long term planning horizon that is split in multiple stages. In the proposed model, the entity responsible for the expansion planning, the Independent Expansion Planner, divulges the indicative expansion plan and other information that will be used by the sector agents to guide its investments in that area. Three network models are used (transport, DC load flow and hybrid transport-DC) in an hierarchical algorithm that uses the Benders decomposition to solve the problem of capacity expansion, considering the investment and operation costs. The original problem is separated in a master subproblem (investment) and several slave subproblems (operation). Each stage is represented by an operation subproblem and the master subproblem is solved by an specialized branch-and-bound algorithm. The operation subproblems (LP problems) are solved through the MINOS package. Strategies to improve the performance of the described algorithm are discussed and presented. The efficiency of those strategies is shown through tests using theoretical and realistic electric systems. The developed branch-and-bound algorithm and the selection techniques employed are described in details and illustrated through examples. It is presented, also, the Independent Planner role and its relevance in the current context of the national electric industry is pointed out. (author)

  5. The ichnologic record of the continental invertebrate invasion: evolutionary trends in environmental expansion, ecospace utilization, and behavioral complexity

    Science.gov (United States)

    Buatois, L.A.; Mangano, M.G.; Genise, Jorge F.; Taylor, T.N.

    1998-01-01

    The combined study of continental trace fossils and associated sedimentary facies provides valuable evidence of colonization trends and events throughout the Phanerozoic. Colonization of continental environments was linked to the exploitation of empty or under-utilized ecospace. Although the nonmarine trace fossil record probably begins during the Late Ordovician, significant invasion of nonmarine biotopes began close to the Silurian-Devonian transition with the establishment of a mobile arthropod epifauna (Diplichnites ichnoguild) in coastal marine to alluvial plain settings. Additionally, the presence of vertical burrows in Devonian high-energy fluvial deposits reflects the establishment of a stationary, deep suspension-feeding infauna of the Skolithos ichnoguild. The earliest evidence of plant-arthropod interaction occurred close to the Silurian-Devonian boundary, but widespread and varied feeding patterns are known from the Carboniferous. During the Carboniferous, permanent subaqueous lacustrine settings were colonized by a diverse, mobile detritus-feeding epifauna of the Mermia ichnoguild, which reflects a significant palaeoenvironmental expansion of trace fossils. Paleozoic ichnologic evidence supports direct routes to the land from marginal marine environments, and migration to lakes from land settings. All nonmarine sedimentary environments were colonized by the Carboniferous, and subsequent patterns indicate an increase in ecospace utilization within already colonized depositional settings. During the Permian, back-filled traces of the Scoyenia ichnoguild record the establishment of a mobile, intermediate-depth, deposit-feeding in-fauna in alluvial and transitional alluvial-lacustrine sediment. Diversification of land plants and the establishment of ecologically diverse plant communities through time provided new niches to be exploited by arthropods. Nevertheless, most ot the evolutionary feeding innovations took place relatively early, during the Late

  6. Master plan envisions multi-billion-dollar expansion of Vietnam's electricity monopoly

    International Nuclear Information System (INIS)

    2001-12-01

    Massive investment in Vietnam's electricity monopoly by Western aid and export credit agencies form part of the ten-year master plan developed for Vietnam. Central planning and political patronage, instead of market assessments and customer choice form the basis for monopoly investments in a centralized grid linking big hydro, gas, coal, and nuclear power projects. Western aid agencies might effectively crowd out viable private-sector energy investments by financing power projects considered too large and risky by the private sector. These investments by Western aid agencies would assist in winning contracts for favoured exporters of engineering services and equipment. It would be a breeding ground for corruption in Vietnam if market discipline, public oversight, and enforceable property rights are not present in the face of power sector aid. There is a real possibility that damages to the environment could result from electricity investments, and some communities might be victimized, electricity costs might increase, the indebtedness level of the population might increase

  7. Multi-objective Generation Expansion Planning for Integrating Largescale Wind Generation

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Ding, Yi; Kang, Chongqing

    2013-01-01

    Due to the growth of energy consumption, the extensive use of conventional fossil fuels from the exhaustible resources and the environmental concerns, high penetration of renewable energy resources is considerably observed worldwide. Wind power generation is holding the first rank in terms...... of utilization and importance. In the last decade, the growth rate of the global installed wind capacity has been about 30% per annum. Denmark, Germany, and Spain are the first few countries generating 20% of their electricity from wind turbines....

  8. Long vigil in Athabasca oil sands culminates in rapid expansion plans

    Energy Technology Data Exchange (ETDEWEB)

    1974-05-01

    Great Canadian Oil Sands Ltd. needs to earn $40 million or more per year to get a reasonable return on the investment, vice president and general manager R.D. Humphreys told delegates at the Petroleum Accountants Society of W. Canada annual conference at Jasper Park Lodge. The conference then was ''the Alberta Oil Sands.'' Sun Oil Co. has taken no return yet, but has paid off the loans and taken shares in return so it owns nearly all the equity capital. The operation is not really breaking even at present, but should improve because GCOS is getting the full effect of the oil price increase under the original royalty agreement with the Alberta government. It is hoped that this will enable the company to recoup an accumulated deficit of more than $90 million. Money is the biggest problem for the current expansion designed to raise production to the authorized 65,000 bpd. Manpower is second and delivery of materials third. There is a lead time of 15 to 18 mo. on critical materials. Over the long term, tailings disposal is the greatest single problem facing all oil sands operators.

  9. Multi-Criteria Analyses of Urban Planning for City Expansion: A Case Study of Zamora, Spain

    Directory of Open Access Journals (Sweden)

    Marco Criado

    2017-10-01

    Full Text Available This study has established a methodology to determine the most environmentally suitable area for the expansion of Zamora (Spain using geographic information system (GIS technology. The objective was to develop a GIS-based methodology for the identification of urban peripheral areas that are suitable for the accommodation of new buildings and services, that are compliant with environmental criteria, and that guarantee an adequate quality of life for the future population such that extra construction costs are avoided. The methodological core is based on two multi-criteria analyses (MCAs: MCA-1 determines areas suitable for building—the most environmentally sustainable areas that do not present risks or discomforts to the population—by analyzing the restrictive factors; MCA-2 takes the sectors that received a favorable evaluation in MCA-1, determines which of those have a lower economic overhead for construction, and analyzes the different conditioning criteria related to their pre-existing infrastructures. Finally, the location of the sectors is determined by a decision factor that satisfies some strategic need of the municipality.

  10. Wien Automatic System Planning (WASP) Package. A computer code for power generating system expansion planning. Version WASP-III Plus. User's manual. Volume 1: Chapters 1-11

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    As a continuation of its effort to provide comprehensive and impartial guidance to Member States facing the need for introducing nuclear power, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package for carrying out power generation expansion planning studies. WASP was originally developed in 1972 in the USA to meet the IAEA's needs to analyze the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. The model was first used by the IAEA to conduct global studies (Market Survey for Nuclear Power Plants in Developing Countries, 1972-1973) and to carry out Nuclear Power Planning Studies for several Member States. The WASP system developed into a very comprehensive planning tool for electric power system expansion analysis. Following these developments, the so-called WASP-Ill version was produced in 1979. This version introduced important improvements to the system, namely in the treatment of hydroelectric power plants. The WASP-III version has been continually updated and maintained in order to incorporate needed enhancements. In 1981, the Model for Analysis of Energy Demand (MAED) was developed in order to allow the determination of electricity demand, consistent with the overall requirements for final energy, and thus, to provide a more adequate forecast of electricity needs to be considered in the WASP study. MAED and WASP have been used by the Agency for the conduct of Energy and Nuclear Power Planning Studies for interested Member States. More recently, the VALORAGUA model was completed in 1992 as a means for helping in the preparation of the hydro plant characteristics to be input in the WASP study and to verify that the WASP overall optimized expansion plan takes also into account an optimization of the use of water for electricity generation. The combined application of VALORAGUA and WASP permits the

  11. Large-scale utilization of wind power in China: Obstacles of conflict between market and planning

    International Nuclear Information System (INIS)

    Zhao Xiaoli; Wang Feng; Wang Mei

    2012-01-01

    The traditional strict planning system that regulates China's power market dominates power industry operations. However, a series of market-oriented reforms since 1997 call for more decentralized decision-making by individual market participants. Moreover, with the rapid growth of wind power in China, the strict planning system has become one of the significant factors that has curtailed the generation of wind power, which contradicts with the original purpose of using the government's strong control abilities to promote wind power development. In this paper, we first present the reasons why market mechanisms are important for large-scale utilization of wind power by using a case analysis of the Northeast Grid, and then we illustrate the impact of conflicts between strict planning and market mechanisms on large-scale wind power utilization. Last, we explore how to promote coordination between markets and planning to realize large-scale wind power utilization in China. We argue that important measures include implementing flexible power pricing mechanisms instead of the current fixed pricing approach, formulating a more reasonable mechanism for distributing benefits and costs, and designing an appropriate market structure for large-scale wind power utilization to promote market liquidity and to send clear market equilibrium signals. - Highlights: ► We present the reasons why market is important for utilization of wind power. ► We discuss the current situation of the conflict between planning and market. ► We study the impact of conflict between planning and market on wind power output. ► We argue how to promote coordination between market and planning.

  12. Exploring the relationship between planning and procurement in Western U.S. electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo Bodelon, Juan Pablo [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division; Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division; Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Division

    2017-06-01

    Integrated resource planning (IRP) is an important regulatory process used in many U.S. states to formulate and evaluate least-cost and risk-assessed portfolios to meet future load requirements for electric utilities. In principle, effective implementation of IRP seeks to assure regulators and the public that utility investment decisions, given uncertainty, are as cost-effective as possible. However, to date, there is no empirical assessment on the effectiveness of IRP implementation. In this analysis, we compare planning, procurement processes and actual decisions for a sample of twelve load serving entities (LSEs) across the Western U. S. from 2003-2014. The 2008/2009 recession provides a unique “stress test” to the planning process and offers an excellent opportunity to trace how procurement decisions responded to this largely unforeseen event. In aggregate, there is a general alignment between planned and procured supply-side capacity. However, there are significant differences in the choice of supply-side resources and type of ownership for individual LSEs. We develop case studies for three LSEs and find that subsequent plans differ significantly due to changes in the planning environment and that procurement decisions in some cases are impacted by factors that are not accounted for in the planning process. Our results reveal that a limited amount of information produced during the long-term planning process (e.g., forecasts, methods, and least cost/risk portfolios) are ultimately used during the procurement process, and that the latter process relies extensively on the most recent information available for decision making. These findings suggest that states' IRP rules and regulations mandating long-term planning horizons with the same analytical complexity throughout the planning period may not create useful information for the procurement process. The social value of a long-term planning process that departs from procurement and the balance between

  13. British Columbia Utilities Commission service plan 2004/2005 - 2006/2007

    International Nuclear Information System (INIS)

    2004-01-01

    The mandate of the British Columbia Utilities Commission (BCUC) is to ensure that customers receive safe, reliable and non-discriminatory energy services at fair rates from the utilities. It must also ensure that the shareholders of the utilities have a reasonable opportunity to earn a fair return on the invested capital. This report describes the following six key areas that underlie the Commission's strategic planning for the next 3 years: (1) regulation of automobile insurance, (2) energy policy implementation, (3) natural gas commodity costs, (4) commercial unbundling and customer choice, (5) energy trade, and (6) benchmarking. The report also describes strategic issues with reference to priorities, shifts and risk management. Alignment with the government's strategic plan was also reviewed. The financial outlook for 2003/04 and 2006/07 shows that the Commission intends to fully recover costs from the utilities it regulates. The budget for 2003/04 has increased somewhat from the forecasted amount for the same period reported in the previous year's service plan. This is due to an expanded mandate. Forecast values for the 2004/05 and 2005/06 planning periods have decreased slightly compared to the previous year's plan. tabs., figs

  14. Management plan of useful life; Plan de gestion de vida util

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Zapata, J. D.

    2009-07-01

    The Cofrentes NPP Life Management Plan is a plant management program that covers all those activities aimed at monitoring, controlling and mitigating the effects of ageing in the safety-related structures, systems and components, as well as in the equipment that is of particular importance for long-term availability of the plant. the methodology used is based on the system and methods of the so-called UNESA Methodology, whose safety-related aspects have been updated with the application of criteria defined in Licensing Renewal regulation 10 CFR 54. the text develops the details of this plan and describes its status at the present time. (Author)

  15. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  16. The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, Kurt D.; Han, Ana M.; Marra, James C.; Fox, Kevin M.; Peeler, David K.; Smith, Michael E.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, Chenwoo

    2009-01-01

    The DOE-EM Office of Engineering and Technology is responsible for implementing EM's international cooperative program. The Office of Engineering and Technology's international efforts are aimed at supporting EM's mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09.

  17. Cast Off expansion plan by rapid improvement through Optimization tool design, Tool Parameters and using Six Sigma’s ECRS Technique

    Science.gov (United States)

    Gopalakrishnan, T.; Saravanan, R.

    2017-03-01

    Powerful management concepts step-up the quality of the product, time saving in producing the product thereby increase the production rate, improves tools and techniques, work culture, work place and employee motivation and morale. In this paper discussed about the case study of optimizing the tool design, tool parameters to cast off expansion plan according ECRS technique. The proposed designs and optimal tool parameters yielded best results and meet the customer demand without expansion plan. Hence the work yielded huge savings of money (direct and indirect cost), time and improved the motivation and more of employees significantly.

  18. Balancing Cost and Risk: The Treatment of Renewable Energy inWestern Utility Resource Plans

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ryan; Bolinger, Mark

    2005-09-01

    Markets for renewable electricity have grown significantly in recent years, motivated in part by federal tax incentives and in part by state renewables portfolio standards and renewable energy funds. State renewables portfolio standards, for example, motivated approximately 45% of the 4,300 MW of wind power installed in the U.S. from 2001 through 2004, while renewable energy funds supported an additional 15% of these installations. Despite the importance of these state policies, a less widely recognized driver for renewable energy market growth is poised to also play an important role in the coming years: utility integrated resource planning (IRP). Formal resource planning processes have re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, recent resource plans contemplate a significant amount of renewable energy additions. These planned additions - primarily coming from wind power - are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. The treatment of renewable energy in utility resource plans is not uniform, however. Assumptions about the direct and indirect costs of renewable resources, as well as resource availability, differ, as do approaches to incorporating such resources into the candidate portfolios that are analyzed in utility IRPs. The treatment of natural gas price risk, as well as the risk of future environmental regulations, also varies substantially. How utilities balance expected portfolio cost versus risk in selecting a preferred portfolio also differs. Each of these variables may have a substantial effect on the degree to which renewable energy contributes to the preferred portfolio of each utility IRP. This article

  19. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  20. Flexible Transmission Network Expansion Planning Considering Uncertain Renewable Generation and Load Demand Based on Hybrid Clustering Analysis

    Directory of Open Access Journals (Sweden)

    Yun-Hao Li

    2015-12-01

    Full Text Available This paper presents a flexible transmission network expansion planning (TNEP approach considering uncertainty. A novel hybrid clustering technique, which integrates the graph partitioning method and rough fuzzy clustering, is proposed to cope with uncertain renewable generation and load demand. The proposed clustering method is capable of recognizing the actual cluster distribution of complex datasets and providing high-quality clustering results. By clustering the hourly data for renewable generation and load demand, a multi-scenario model is proposed to consider the corresponding uncertainties in TNEP. Furthermore, due to the peak distribution characteristics of renewable generation and heavy investment in transmission, the traditional TNEP, which caters to rated renewable power output, is usually uneconomic. To improve the economic efficiency, the multi-objective optimization is incorporated into the multi-scenario TNEP model, while the curtailment of renewable generation is considered as one of the optimization objectives. The solution framework applies a modified NSGA-II algorithm to obtain a set of Pareto optimal planning schemes with different levels of investment costs and renewable generation curtailments. Numerical results on the IEEE RTS-24 system demonstrated the robustness and effectiveness of the proposed approach.

  1. Multi area and multistage expansion-planning of electricity supply with sustainable energy development criteria: a multi objective model

    Energy Technology Data Exchange (ETDEWEB)

    Unsihuay-Vila, Clodomiro; Marangon-Lima, J.W.; Souza, A.C Zambroni de [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], emails: clodomirounsihuayvila @gmail.com, marangon@unifei.edu.br, zambroni@unifei.edu.br; Perez-Arriaga, I.J. [Universidad Pontificia Comillas, Madrid (Spain)], email: ipa@mit.edu

    2010-07-01

    A novel multi objective, multi area and multistage model to long-term expansion-planning of integrated generation and transmission corridors incorporating sustainable energy developing is presented in this paper. The proposed MESEDES model is a multi-regional multi-objective and 'bottom-up' energy model which considers the electricity generation/transmission value-chain, i.e., power generation alternatives including renewable, nuclear and traditional thermal generation along with transmission corridors. The model decides the optimal location and timing of the electricity generation/transmission abroad the multistage planning horizon. The MESEDES model considers three objectives belonging to sustainable energy development criteria such as: a) the minimization of investments and operation costs of : power generation, transmission corridors, energy efficiency (demand side management (DSM) programs) considering CO2 capture technologies; b) minimization of Life Cycle Greenhouse Gas Emissions (LC GHG); c) maximization of the diversification of electricity generation mix. The proposed model consider aspects of the carbon abatement policy under the CDM - Clean Development Mechanism or European Union Greenhouse Gas Emission Trading Scheme. A case study is used to illustrate the proposed framework. (author)

  2. The US DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    International Nuclear Information System (INIS)

    Gerdes, K.D.; Han, A.M.; Marra, J.C.; Fox, K.M.; Peeler, D.K.; Smith, M.E.; Jannik, G.T.; Farfan, E.B.; Kim, D.S.; Vienna, J.D.; Roach, J.A.; Aloy, A.S.; Stefanovsky, S.V.; Bondarkov, M.D.; Lopukh, D.P.; Kim, C.W.

    2009-01-01

    monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination; and - Recommend the development and testing of effective cleanup technologies to reduce environmental and health risks. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the international program. A collaborative project with Russian Electrotechnical University is underway to evaluate Cold Crucible Induction Melter (CCIM) control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09. (authors)

  3. Proposing and Planning the Rehabilitation Works of Mechanical Utility System in Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Jusnan Hasim; Mohamad Suhaimi Yahaya; Abdul Razak Hashim

    2015-01-01

    Nuclear Malaysia has 2 complex located in Bangi and Jalan Dengkil. The utility in Nuclear Malaysia consists of civil, mechanical and electrical system that has been managed by Bahagian Kejuruteraan (BKJ). The mechanical utilities system has been divided to three main groups which are the main system, supporting system and safety equipment's. The objectives of this paper are to propose and plan the rehabilitation works of mechanical utility system in Nuclear Malaysia and also to explain working procedures in maintaining and repairing the mechanical utility system. The study suggest the rehabilitation works on the mechanical utilities system especially on Thermal Energy Storage (TES) and domestic water system needs to be done which involve process of design, procurement, installation and commissioning. (author)

  4. Benefits from remote sensing data utilization in urban planning processes and system recommendations

    Science.gov (United States)

    Mallon, H. J.; Howard, J. Y.

    1972-01-01

    The benefits of utilizing remote sensor data in the urban planning process of the Metropolitan Washington Council of Governments are investigated. An evaluation of sensor requirements, a description/ comparison of costs, benefits, levels of accuracy, ease of attainment, and frequency of update possible using sensor versus traditional data acquisition techniques are discussed.

  5. Basic plan of the development and utilization of atomic energy in 1980

    International Nuclear Information System (INIS)

    1980-01-01

    The Nuclear Safety Commission reported to the prime minister on March 28, 1980, on the basic plan of the development and utilization of atomic energy in 1980 that it was decided as the original draft of the plan. This draft of the basic plan in 1980 was referred to the Nuclear Safety Commission on March 27, 1980. Japan relies the most of primary energy upon imported petroleum, therefore it is important to save oil consumption and to promote the development and utilization of substitute energy to petroleum. The development and utilization of atomic energy must be promoted as the most important subject in energy policy, because it is the most promising substitute energy. The scale of the total nuclear power generation in Japan is 35 plants with about 28 million kW capacity, including those under construction and in preparation. But owing to the difficulty in the location of new plants, the attainment of 1985 target is behind schedule. The development and utilization of atomic energy are in progress in Japan, but more efforts to promote them are necessary. Japan contributes positively to the formation of the new order based on the results of INFCE. As for the basic policy in 1980, the strengthening of the measures to secure safety, the establishment of nuclear fuel cycle, the development of new power reactors, the research and development of nuclear fusion, the promotion of the utilization of radiation and others are discussed. (Kako, I.)

  6. A technology-assessment methodology for electric utility planning: With application to nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Lough, W.T.

    1987-01-01

    Electric utilities and public service commissions have not taken full advantage of the many proven methodologies and techniques available for evaluating complex technological issues. In addition, evaluations performed are deficient in their use of (1) methods for evaluating public attitudes and (2) formal methods of analysis for decision making. These oversight are substantiated through an examination of the literature relevant to electric utility planning. The assessment process known as technology assessment or TA is proposed, and a TA model is developed for route in use in utility planning by electric utilities and state regulatory commissions. Techniques to facilitate public participation and techniques to aid decision making are integral to the proposed model and are described in detail. Criteria are provided for selecting an appropriate technique on a case-by-case basis. The TA model proved to be an effective methodology for evaluating technological issues associated with electric utility planning such as decommissioning nuclear power plants. Through the use of the nominal group technique, the attitudes of a group of residential ratepayers were successfully identified and included in the decision-making process

  7. Basic plans of nuclear energy development and utilization for fiscal 1982 (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report by the Nuclear Safety Commission to the Prime Minister, concerning the basic plans of nuclear energy development and utilization for fiscal 1982, was presented; the NSC has decided on the plans drawn up by the Prime Minister. Nuclear power generation as the nucleus of petroleum substitutes must be developed steadily. For the purpose, nuclear fuel cycle should be established, including the securing of uranium resources, uranium enrichment, fuel reprocessing, and waste management. The contents are as follows: the strengthening of nuclear safety measures, the promotion of nuclear power generation, the establishment of nuclear fuel cycle, the development of advanced types of reactors, the research on nuclear fusion, the research and development of nuclear powered ships, the promotion of radiation utilization, the strengthening of basis for nuclear energy development and utilization, the promotion of international cooperation, the strengthening of safeguard and nuclear material protection measures, fiscal 1982 budgets related to nuclear energy. (Mori, K.)

  8. How integrated resource planning for US electric utilities affects shareholder interests

    International Nuclear Information System (INIS)

    Hadley, S.; Hirst, E.

    1995-01-01

    Integrated resource planning (IRP) seeks to identify the mix of resources that can best meet the future energy-service needs of customers. These resources include new sources, types, and owners of power plants plus demand-side management (DSM) programs. However, little explicit attention is given to utility shareholders in the typical resource-planning proceeding. Because of the complexity of state regulatory practices and tax policies, it seems unlikely that different resources that provide comparable services to customers will yield comparable returns to shareholders. This study examines a typical US investor-owned utility's financial operations and performance using a spreadsheet model we developed for this project. The model simulates an electric utility's financial operations, and produces an annual income statement, balance sheet, and cash-flow statement. We calculated the net present value of realized (cash) return on equity as the primary factor used to represent shareholder interests. We examined shareholder returns for these resources as functions of public utility commission regulation, taxes, and the utility's operating environment. Given the increasingly competitive nature of electricity markets, we examined shareholder returns for these resources in an environment where the utility competes with other suppliers solely on the basis of electricity price. (author)

  9. A computational model for determining the minimal cost expansion alternatives in transmission systems planning; Um modelo computacional para determinacao de alternativas de expansao de custo minimo em planejamento de sistemas de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, L M.V.G.; Pereira, M V.F. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Nunes, A [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1990-12-31

    A computational model for determining an economical transmission expansion plan, based in the decomposition techniques is presented. The algorithm was used in the Brazilian South System and was able to find an optimal solution, with a low computational resource. Some expansions of this methodology are been investigated: the probabilistic one and the expansion with financier restriction. (C.G.C.). 4 refs, 7 figs.

  10. Utilizing the Updated Gamma-Ray Bursts and Type Ia Supernovae to Constrain the Cardassian Expansion Model and Dark Energy

    Directory of Open Access Journals (Sweden)

    Jun-Jie Wei

    2015-01-01

    Full Text Available We update gamma-ray burst (GRB luminosity relations among certain spectral and light-curve features with 139 GRBs. The distance modulus of 82 GRBs at z>1.4 can be calibrated with the sample at z≤1.4 by using the cubic spline interpolation method from the Union2.1 Type Ia supernovae (SNe Ia set. We investigate the joint constraints on the Cardassian expansion model and dark energy with 580 Union2.1 SNe Ia sample (z<1.4 and 82 calibrated GRBs’ data (1.4expansion model, the best fit is Ωm=0.24-0.15+0.15 and n=0.16-0.52+0.30  (1σ, which is consistent with the ΛCDM cosmology (n=0 in the 1σ confidence region. We also discuss two dark energy models in which the equation of state w(z is parameterized as w(z=w0 and w(z=w0+w1z/(1+z, respectively. Based on our analysis, we see that our universe at higher redshift up to z=8.2 is consistent with the concordance model within 1σ confidence level.

  11. Implementation of the robustness analysis methodology for decenal planning in the expansion of electric sector; Aplicacao da metodologia de analise de robustez ao planejamento decenal de expansao do setor eletrico

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Renata de Azevedo Moreira da

    2008-05-15

    The objective of this dissertation is to develop an application from one of the techniques of 'soft' operational research, the Robustness Analysis, to the problem of decision making under uncertainty, as part of the planning of the electricity expansion planning process in Brazil. Initially are shown desirable characteristics of a methodology that will complement the traditional methods used in determining the expansion of the sector. Departing from the Decenal Plan for Power Expansion (2007/2016), an analysis of the different trends that can occur during the planning process is presented, so as to facilitate the visualization of the consequences of uncertainties that may change the schedule of the planned expansion and also help the interaction between actors working in the expansion planning of electricity generation. (author)

  12. Implementation of the robustness analysis methodology for decenal planning in the expansion of electric sector; Aplicacao da metodologia de analise de robustez ao planejamento decenal de expansao do setor eletrico

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Renata de Azevedo Moreira da

    2008-05-15

    The objective of this dissertation is to develop an application from one of the techniques of 'soft' operational research, the Robustness Analysis, to the problem of decision making under uncertainty, as part of the planning of the electricity expansion planning process in Brazil. Initially are shown desirable characteristics of a methodology that will complement the traditional methods used in determining the expansion of the sector. Departing from the Decenal Plan for Power Expansion (2007/2016), an analysis of the different trends that can occur during the planning process is presented, so as to facilitate the visualization of the consequences of uncertainties that may change the schedule of the planned expansion and also help the interaction between actors working in the expansion planning of electricity generation. (author)

  13. Comparisons of recent growth in actual demand, planned demand, and planned generating capacity at U. S. electric utilities

    Energy Technology Data Exchange (ETDEWEB)

    Bopp, A.E. (James Madison Univ., Harrisonburg, VA (United States))

    1994-12-01

    During the winter of 1993, a number of U.S. electric utilities and some regional power pools discovered that current load exceeded generating capacity. Load restrictions followed, as entire regions-not just isolated utilities or even states-cut back. Was 1993 a typical, or simply a preview of the future If a preview, how did this shortage occur For a number of years, utilities, regulatory agencies, and power pools have been planning to add capacity at a much lower rate than the rate at which load has been growing. The National Electricity Reliability Council (NERC) has projected that eight of it's nine regions will have demand growth exceed capacity growth. The only region where capacity is growing faster is in the Texas Region. There are four reasons behind this shortage: excess capacity in the 1980's, disbelief in current forecasts, passage of the Clean Air act bringing stricter regulation on power plants, and the herd mentality where utilities have all delayed new plant construction.

  14. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  15. Evaluation of the potential expansiveness of soils in the Hermanos Cruz neighbourhood, Pinar del Rio, Cuba: a contribution to urban planning

    International Nuclear Information System (INIS)

    Chinthaka-Ganepola, G.A.; Mohammed, A. S.; Ordaz Hernandez, A.; Estevez Cruz, E.; Hernandez Santana, J.R.

    2016-01-01

    Expansive soils can be categorized as one of the geohazards observed in the urban environment, representing a silent hazard to buildings and infrastructure. To evaluate this problematic soil it is necessary to know some of its geotechnical properties. Generally, the average values of soil properties are used in the methods which characterize the geological formation and the lithological group, which causes a great degree of uncertainty. To overcome this problem, this study proposes a procedure for estimating and modelling the principle soil properties that have an impact on expansive soils. The selected case study is located in the Hermanos Cruz neighbourhood in the city of Pinar del Rio in Cuba. The investigation was organized into the following stages: primary assessment of the potential expansiveness of the soils, modelling of the soil properties utilizing 3D geostatistical methods and finally the cartographic representation of the potential Expansiveness of soils on a Geographic Information System (GIS) platform at different depth zones which are of importance in the construction of shallow foundations of engineering works. The application of this methodology in the Hermanos Cruz neighbourhood revealed that its soils possess a potential expansiveness of low to medium, apart from some isolated zones which show a potential expansiveness of medium to high. (Author)

  16. Evaluation of the potential expansiveness of soils in the Hermanos Cruz neighbourhood, Pinar del Rio, Cuba: a contribution to urban planning

    Energy Technology Data Exchange (ETDEWEB)

    Chinthaka-Ganepola, G.A.; Mohammed, A. S.; Ordaz Hernandez, A.; Estevez Cruz, E.; Hernandez Santana, J.R.

    2016-07-01

    Expansive soils can be categorized as one of the geohazards observed in the urban environment, representing a silent hazard to buildings and infrastructure. To evaluate this problematic soil it is necessary to know some of its geotechnical properties. Generally, the average values of soil properties are used in the methods which characterize the geological formation and the lithological group, which causes a great degree of uncertainty. To overcome this problem, this study proposes a procedure for estimating and modelling the principle soil properties that have an impact on expansive soils. The selected case study is located in the Hermanos Cruz neighbourhood in the city of Pinar del Rio in Cuba. The investigation was organized into the following stages: primary assessment of the potential expansiveness of the soils, modelling of the soil properties utilizing 3D geostatistical methods and finally the cartographic representation of the potential Expansiveness of soils on a Geographic Information System (GIS) platform at different depth zones which are of importance in the construction of shallow foundations of engineering works. The application of this methodology in the Hermanos Cruz neighbourhood revealed that its soils possess a potential expansiveness of low to medium, apart from some isolated zones which show a potential expansiveness of medium to high. (Author)

  17. The generation expansion planning of the Brazilian electric sector employing genetic algorithms; O planejamento da expansao da geracao do setor eletrico brasileiro utilizando os algoritmos geneticos

    Energy Technology Data Exchange (ETDEWEB)

    Kazay, Heloisa Firmo

    2001-07-01

    The generation expansion-planning problem is a non-linear large-scale optimisation problem, which is even larger when it refers to the Brazilian system, and when one considers the multiple intervening uncertainty sources. To handle the complexity of the problem, decomposition schemes have been used. Usually, such schemes divide the expansion problem into two sub-problems: one related to the construction of new plants (investment sub-problem) and another dealing with the task of operating the system (operation sub-problem). This thesis proposes a genetic algorithm to solve the investment sub-problem. Initially, an analysis of the state of the art on the generation expansion planning and the field of the genetic algorithms are presented. Then follows a practical application of the proposed algorithm in a model of generation expansion planning under uncertainty. Finally, the results obtained in two case studies are presented and analysed. These results indicate that the proposed genetic algorithm is an effective alternative to the solution of the investment sub-problem. (author)

  18. A comparative assessment of the long term electricity expansion plans in Mexico by using the position vector of minimum regret analysis

    International Nuclear Information System (INIS)

    Martindelcampo, C.; Gonzalezbello, C. R.

    2012-01-01

    A comparative assessment of alternative expansion plans for the Mexican electricity generating system was made by applying the Position Vector of Minimum Regret Analysis (PVMRA) as a decision analysis tool. Four expansion plans were ranked according to the following decision criteria: The cost which calculates the cumulated cost of electricity generation during the time period studied. The external cost which brings into play the costs associated with the impact on health and the environment. The risk which takes into account the economic impact associated with incremental fuel prices from the baseline scenario to the high scenario. The diversity which evaluates the generation park diversity in terms of the Shannon-Weaner Index. The foreign-capital fraction in investment using foreign inputs. The carbon-free fraction which evaluates electricity generation that contributes to climate change policies. The cost of severe-accidents which is the sum of full chain damage costs and external costs of severe accidents with at least 10 injured. Optimizations were made by internalizing the external cost into the objective function of the WASP-IV model, the cost of externalise of the operation and maintenance cost, and these expansions were compared with those that did not. Special attention was paid to studying the convenience of including nuclear power in the electricity generation mix. Furthermore, better electricity expansion plans, with lower internal and external costs, were also found when the optimization had included externalise

  19. Utilization of family planning services by married Sudanese women of reproductive age.

    Science.gov (United States)

    Ibnouf, A H; van den Borne, H W; Maarse, J A M

    2007-01-01

    To explore differences in utilization of family planning services and predisposing factors, we surveyed 601 women from urban and rural areas of Khartoum state. About half were using modern family planning techniques; there were no significant differences in utilization rates between urban and rural settings. Contraceptive pills were the most frequently used modern method (47.7%) followed by intrauterine devices (10.2%) and injections (7.5%). Breastfeeding was used by around 33% of both groups. The rhythm method and withdrawal were more often used by urban women (22.2% and 8.6% respectively) than rural women (16.1% and 3.6% respectively). Use of male methods (condom; sterilization) was extremely low. Socioeconomic status, knowledge and education level were the most important determinants of using modern methods.

  20. UBB expansion plan: Spain

    OpenAIRE

    Sousa, André Henderson

    2014-01-01

    Project of Master in International Management Just like the Portuguese saying “who runs for fun does not get tired”. UBB, a textile merchandising brand for Universities has been founded by four friends in 2012. It all started when Rui and André noticed that in their university there was no official merchandising. They saw a window of opportunity of bringing something new to the fore, which was an alternative for universities to have an official merchandising line without any monetar...

  1. Commercial gas utilization in the Netherlands. Six years of the Marketing Plan Public Gas Supply (MOG)

    International Nuclear Information System (INIS)

    Hoelen, Q.E.J.J.M.; Bartholomeus, P.H.J.; Mallon, W.Ch.

    1998-01-01

    In 1992, Gasunie (Dutch natural gas trading company) started its marketing plan for the public natural gas supply (MOG, abbreviated in Dutch). The aim is to promote the use of natural gas in cooperation with gas utilities. For the commercial sector many different gas appliances are available: high-efficiency deep-frying pans for the catering sector, gas-fired air humidifiers for office and public buildings, gas-fired tumble dryers for small and medium-sized businesses, etc

  2. Estimating the Value of Improved Distributed Photovoltaic Adoption Forecasts for Utility Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gagnon, Pieter [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barbose, Galen L. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Stoll, Brady [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ehlen, Ali [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarret [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mills, Andrew D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2018-05-15

    Misforecasting the adoption of customer-owned distributed photovoltaics (DPV) can have operational and financial implications for utilities; forecasting capabilities can be improved, but generally at a cost. This paper informs this decision-space by using a suite of models to explore the capacity expansion and operation of the Western Interconnection over a 15-year period across a wide range of DPV growth rates and misforecast severities. The system costs under a misforecast are compared against the costs under a perfect forecast, to quantify the costs of misforecasting. Using a simplified probabilistic method applied to these modeling results, an analyst can make a first-order estimate of the financial benefit of improving a utility’s forecasting capabilities, and thus be better informed about whether to make such an investment. For example, under our base assumptions, a utility with 10 TWh per year of retail electric sales who initially estimates that DPV growth could range from 2% to 7.5% of total generation over the next 15 years could expect total present-value savings of approximately $4 million if they could reduce the severity of misforecasting to within ±25%. Utility resource planners can compare those savings against the costs needed to achieve that level of precision, to guide their decision on whether to make an investment in tools or resources.

  3. NESTLE: Few-group neutron diffusion equation solver utilizing the nodal expansion method for eigenvalue, adjoint, fixed-source steady-state and transient problems

    International Nuclear Information System (INIS)

    Turinsky, P.J.; Al-Chalabi, R.M.K.; Engrand, P.; Sarsour, H.N.; Faure, F.X.; Guo, W.

    1994-06-01

    NESTLE is a FORTRAN77 code that solves the few-group neutron diffusion equation utilizing the Nodal Expansion Method (NEM). NESTLE can solve the eigenvalue (criticality); eigenvalue adjoint; external fixed-source steady-state; or external fixed-source. or eigenvalue initiated transient problems. The code name NESTLE originates from the multi-problem solution capability, abbreviating Nodal Eigenvalue, Steady-state, Transient, Le core Evaluator. The eigenvalue problem allows criticality searches to be completed, and the external fixed-source steady-state problem can search to achieve a specified power level. Transient problems model delayed neutrons via precursor groups. Several core properties can be input as time dependent. Two or four energy groups can be utilized, with all energy groups being thermal groups (i.e. upscatter exits) if desired. Core geometries modelled include Cartesian and Hexagonal. Three, two and one dimensional models can be utilized with various symmetries. The non-linear iterative strategy associated with the NEM method is employed. An advantage of the non-linear iterative strategy is that NSTLE can be utilized to solve either the nodal or Finite Difference Method representation of the few-group neutron diffusion equation

  4. Dynamics of a Successful Planned Giving Program Utilizing Shared Leadership at Historically Black Colleges and Universities (HBCUs)

    Science.gov (United States)

    Baldwin, Robin Lynn Brunty

    2013-01-01

    The purpose of this study was to evaluate the dynamics of a successful planned giving program utilizing shared leadership at Historically Black Colleges and Universities (HBCUs). This information will assist the leadership in determining if and how a successful planned giving program can be established for HBCUs. It is possible for planned gifts…

  5. Resource planning for gas utilities: Using a model to analyze pivotal issues

    Energy Technology Data Exchange (ETDEWEB)

    Busch, J.F.; Comnes, G.A.

    1995-11-01

    With the advent of wellhead price decontrols that began in the late 1970s and the development of open access pipelines in the 1980s and 90s, gas local distribution companies (LDCs) now have increased responsibility for their gas supplies and face an increasingly complex array of supply and capacity choices. Heretofore this responsibility had been share with the interstate pipelines that provide bundled firm gas supplies. Moreover, gas supply an deliverability (capacity) options have multiplied as the pipeline network becomes increasing interconnected and as new storage projects are developed. There is now a fully-functioning financial market for commodity price hedging instruments and, on interstate Pipelines, secondary market (called capacity release) now exists. As a result of these changes in the natural gas industry, interest in resource planning and computer modeling tools for LDCs is increasing. Although in some ways the planning time horizon has become shorter for the gas LDC, the responsibility conferred to the LDC and complexity of the planning problem has increased. We examine current gas resource planning issues in the wake of the Federal Energy Regulatory Commission`s (FERC) Order 636. Our goal is twofold: (1) to illustrate the types of resource planning methods and models used in the industry and (2) to illustrate some of the key tradeoffs among types of resources, reliability, and system costs. To assist us, we utilize a commercially-available dispatch and resource planning model and examine four types of resource planning problems: the evaluation of new storage resources, the evaluation of buyback contracts, the computation of avoided costs, and the optimal tradeoff between reliability and system costs. To make the illustration of methods meaningful yet tractable, we developed a prototype LDC and used it for the majority of our analysis.

  6. Effects of a consumer driven health plan on pharmaceutical spending and utilization.

    Science.gov (United States)

    Parente, Stephen T; Feldman, Roger; Chen, Song

    2008-10-01

    To compare pharmaceutical spending and utilization in a consumer driven health plan (CDHP) with a three-tier pharmacy benefit design, and to examine whether the CDHP creates incentives to reduce pharmaceutical spending and utilization for chronically ill patients, generic or brand name drugs, and mail-order drugs. Retrospective insurance claims analysis from a large employer that introduced a CDHP in 2001 in addition to a point of service (POS) plan and a preferred provider organization (PPO), both of which used a three-tier pharmacy benefit. Difference-in-differences regression models were estimated for drug spending and utilization. Control variables included the employee's income, age, and gender, number of covered lives per contract, election of flexible spending account, health status, concurrent health shock, cohort, and time trend. Results. CDHP pharmaceutical expenditures were lower than those in the POS cohort in 1 year without differences in the use of brand name drugs. We find limited evidence of less drug consumption by CDHP enrollees with chronic illnesses, and some evidence of less generic drug use and more mail-order drug use among CDHP members. The CDHP is cost-neutral or cost-saving to both the employer and the employee compared with three-tier benefits with no differences in brand name drug use. © Health Research and Educational Trust.

  7. Scenario-based water resources planning for utilities in the Lake Victoria region

    Science.gov (United States)

    Mehta, Vishal K.; Aslam, Omar; Dale, Larry; Miller, Norman; Purkey, David R.

    Urban areas in the Lake Victoria (LV) region are experiencing the highest growth rates in Africa. As efforts to meet increasing demand accelerate, integrated water resources management (IWRM) tools provide opportunities for utilities and other stakeholders to develop a planning framework comprehensive enough to include short term (e.g. landuse change), as well as longer term (e.g. climate change) scenarios. This paper presents IWRM models built using the Water Evaluation And Planning (WEAP) decision support system, for three towns in the LV region - Bukoba (Tanzania), Masaka (Uganda), and Kisii (Kenya). Each model was calibrated under current system performance based on site visits, utility reporting and interviews. Projected water supply, demand, revenues and costs were then evaluated against a combination of climate, demographic and infrastructure scenarios up to 2050. Our results show that water supply in all three towns is currently infrastructure limited; achieving existing design capacity could meet most projected demand until 2020s in Masaka beyond which new supply and conservation strategies would be needed. In Bukoba, reducing leakages would provide little performance improvement in the short-term, but doubling capacity would meet all demands until 2050. In Kisii, major infrastructure investment is urgently needed. In Masaka, streamflow simulations show that wetland sources could satisfy all demand until 2050, but at the cost of almost no water downstream of the intake. These models demonstrate the value of IWRM tools for developing water management plans that integrate hydroclimatology-driven supply to demand projections on a single platform.

  8. Pilot utilization plan for satellite data-based service for agriculture in Poland

    Science.gov (United States)

    Gatkowska, Martyna; Paradowski, Karol; Wróbel, Karolina

    2017-10-01

    The paper aims at demonstrating the assumptions and achievements of the Pilot Utilization Plan Activities performed within the Project ASAP "Advanced Sustainable Agricultural Production", co-financed by European Space Agency under the ARTES IAP Programme. Within the course of the project, the Pilot Utilization Plan (PilUP) activities are performed in order to develop the remote sensing based models, and further calibrate and validate them in order to achieve the accuracy, which meets the requirements of paying customers. The completion of the first PilUP resulted in development of the following models based of Landsat 8 and Sentinel 2 satellite data: model of homogenous polygons demarcation on the basis of comparison of electromagnetic scanning results and bare soil spectral reflectance, model of problematic areas indication and model for yield potential, delivered on the basis of NDVI map developed 1 month before harvest and the map of yield/collected yield derived from Users participating in PilUP. The second edition of the PilUP is being conducted between March 2017 until the end of 2017. This edition includes farmers and insurance companies. The following activities are planned: development of model for delimitation of loses due to unfavorable wintering of winter crops and validation of the model with in-situ data collected by the insurance companies in-field investigators, further enhancement of the model for homogenous polygons delimitation and primary indication of soil productivity and testing of the applicability and viability of map of problematic areas with the farmers.

  9. Planning for Micro-grid with Static Voltage Stability and Maximizing Renewable Energy Utilization

    Science.gov (United States)

    Zhou, Youfu; Zhang, Yuhong; Lv, Xuehai; Zhang, Wentai; Wei, Jun; Zhang, Changhua; Chen, Xin

    2017-05-01

    The access position and capacity of distribution generation (DG) affect the static voltage stability of micro-grid, thus affecting the renewable energy utilization. In the current reform of the energy supply side, a multi-objective optimization model is established, aiming at the abandoning wind and abandoning light problem. This model has three advantages, which are the largest renewable energy utilization, static voltage stability of micro-grid and the minimum cost of DG investment considering environmental benefits. It can effectively promote the use of wind power, photovoltaic power generation and other renewable energy sources. In this paper, the multi-objective optimization problem is transformed into a single objective programming problem by using the deviation method; the optimal solution of multi-objective function is solved by using particle swarm optimization algorithm, so as to establish the planning scheme of micro-grid. Simulation results prove the correctness and feasibility of the optimization method.

  10. Utilization of a photon transport code to investigate radiation therapy treatment planning quantities and techniques

    International Nuclear Information System (INIS)

    Palta, J.R.

    1981-01-01

    A versatile computer program MORSE, based on neutron and photon transport theory has been utilzed to investigate radiation therapy treatment planning quantities and techniques. A multi-energy group representation of transport equation provides a concise approach in utilizing Monte Carlo numerical techniques to multiple radiation therapy treatment planning problems. Central axis total and scattered dose distributions for homogeneous and inhomogeneous water phantoms are calculated and the correction factor for lung and bone inhomogeneities are also evaluated. Results show that Monte Carlo calculations based on multi-energy group tansport theory predict the depth dose distributions that are in good agreement with available experimental data. Central axis depth dose distributions for a bremsstrahlung spectrum from a linear accelerator is also calculated to exhibit the versatility of the computer program in handling multiple radiation therapy problems. A novel approach is undertaken to study the dosimetric properties of brachytherapy sources

  11. Hesitant Fuzzy Linguistic Preference Utility Set and Its Application in Selection of Fire Rescue Plans

    Science.gov (United States)

    Si, Guangsen; Xu, Zeshui

    2018-01-01

    Hesitant fuzzy linguistic term set provides an effective tool to represent uncertain decision information. However, the semantics corresponding to the linguistic terms in it cannot accurately reflect the decision-makers’ subjective cognition. In general, different decision-makers’ sensitivities towards the semantics are different. Such sensitivities can be represented by the cumulative prospect theory value function. Inspired by this, we propose a linguistic scale function to transform the semantics corresponding to linguistic terms into the linguistic preference values. Furthermore, we propose the hesitant fuzzy linguistic preference utility set, based on which, the decision-makers can flexibly express their distinct semantics and obtain the decision results that are consistent with their cognition. For calculations and comparisons over the hesitant fuzzy linguistic preference utility sets, we introduce some distance measures and comparison laws. Afterwards, to apply the hesitant fuzzy linguistic preference utility sets in emergency management, we develop a method to obtain objective weights of attributes and then propose a hesitant fuzzy linguistic preference utility-TOPSIS method to select the best fire rescue plan. Finally, the validity of the proposed method is verified by some comparisons of the method with other two representative methods including the hesitant fuzzy linguistic-TOPSIS method and the hesitant fuzzy linguistic-VIKOR method. PMID:29614019

  12. Virtual medicine: Utilization of the advanced cardiac imaging patient avatar for procedural planning and facilitation.

    Science.gov (United States)

    Shinbane, Jerold S; Saxon, Leslie A

    Advances in imaging technology have led to a paradigm shift from planning of cardiovascular procedures and surgeries requiring the actual patient in a "brick and mortar" hospital to utilization of the digitalized patient in the virtual hospital. Cardiovascular computed tomographic angiography (CCTA) and cardiovascular magnetic resonance (CMR) digitalized 3-D patient representation of individual patient anatomy and physiology serves as an avatar allowing for virtual delineation of the most optimal approaches to cardiovascular procedures and surgeries prior to actual hospitalization. Pre-hospitalization reconstruction and analysis of anatomy and pathophysiology previously only accessible during the actual procedure could potentially limit the intrinsic risks related to time in the operating room, cardiac procedural laboratory and overall hospital environment. Although applications are specific to areas of cardiovascular specialty focus, there are unifying themes related to the utilization of technologies. The virtual patient avatar computer can also be used for procedural planning, computational modeling of anatomy, simulation of predicted therapeutic result, printing of 3-D models, and augmentation of real time procedural performance. Examples of the above techniques are at various stages of development for application to the spectrum of cardiovascular disease processes, including percutaneous, surgical and hybrid minimally invasive interventions. A multidisciplinary approach within medicine and engineering is necessary for creation of robust algorithms for maximal utilization of the virtual patient avatar in the digital medical center. Utilization of the virtual advanced cardiac imaging patient avatar will play an important role in the virtual health care system. Although there has been a rapid proliferation of early data, advanced imaging applications require further assessment and validation of accuracy, reproducibility, standardization, safety, efficacy, quality

  13. Mental Health Services Utilization and Expenditures Among Children Enrolled in Employer-Sponsored Health Plans.

    Science.gov (United States)

    Walter, Angela Wangari; Yuan, Yiyang; Cabral, Howard J

    2017-05-01

    Mental illness in children increases the risk of developing mental health disorders in adulthood, and reduces physical and emotional well-being across the life course. The Mental Health Parity and Addiction Equity Act (MHPAEA, 2008) aimed to improve access to mental health treatment by requiring employer-sponsored health plans to include insurance coverage for behavioral health services. Investigators used IBM Watson/Truven Analytics MarketScan claims data (2007-2013) to examine: (1) the distribution of mental illness; (2) trends in utilization and out-of-pocket expenditures; and (3) the overall effect of the MHPAEA on mental health services utilization and out-of-pocket expenditures among privately-insured children aged 3 to 17 with mental health disorders. Multivariate Poisson regression and linear regression modeling techniques were used. Mental health services use for outpatient behavioral health therapy (BHT) was higher in the years after the implementation of the MHPAEA (2010-2013). Specifically, before the MHPAEA implementation, the annual total visits for BHT provided by mental health physicians were 17.1% lower and 2.5% lower for BHT by mental health professionals, compared to years when MHPAEA was in effect. Children covered by consumer-driven and high-deductible plans had significantly higher out-of-pocket expenditures for BHT compared to those enrolled PPOs. Our findings demonstrate increased mental health services use and higher out-of-pocket costs per outpatient visit after implementation of the MHPAEA. As consumer-driven and high-deductible health plans continue to grow, enrollees need to be cognizant of the impact of health insurance benefit designs on health services offered in these plans. Copyright © 2017 by the American Academy of Pediatrics.

  14. Portability, Salary and Asset Price Risk: A Continuous-Time Expected Utility Comparison of DB and DC Pension Plans

    Directory of Open Access Journals (Sweden)

    An Chen

    2015-03-01

    Full Text Available This paper compares two different types of private retirement plans from the perspective of a representative beneficiary: a defined benefit (DB and a defined contribution (DC plan. While salary risk is the main common risk factor in DB and DC pension plans, one of the key differences is that DB plans carry portability risks, whereas DC plans bear asset price risk. We model these tradeoffs explicitly in this paper and compare these two plans in a utility-based framework. Our numerical analysis focuses on answering the question of when the beneficiary is indifferent between the DB and DC plan. Most of our results confirm the findings in the existing literature, among which, e.g., portability losses considerably reduce the relative attractiveness of the DB plan. However, we also find that the attractiveness of the DB plan can decrease in the level of risk aversion, which is inconsistent with the existing literature.

  15. Resource utilization after introduction of a standardized clinical assessment and management plan.

    Science.gov (United States)

    Friedman, Kevin G; Rathod, Rahul H; Farias, Michael; Graham, Dionne; Powell, Andrew J; Fulton, David R; Newburger, Jane W; Colan, Steven D; Jenkins, Kathy J; Lock, James E

    2010-01-01

    A Standardized Clinical Assessment and Management Plan (SCAMP) is a novel quality improvement initiative that standardizes the assessment and management of all patients who carry a predefined diagnosis. Based on periodic review of systemically collected data the SCAMP is designed to be modified to improve its own algorithm. One of the objectives of a SCAMP is to identify and reduce resource utilization and patient care costs. We retrospectively reviewed resource utilization in the first 93 arterial switch operation (ASO) SCAMP patients and 186 age-matched control ASO patients. We compared diagnostic and laboratory testing obtained at the initial SCAMP clinic visit and control patient visits. To evaluate the effect of the SCAMP over time, the number of clinic visits per patient year and echocardiograms per patient year in historical control ASO patients were compared to the projected rates for ASO SCAMP participants. Cardiac magnetic resonance imaging (MRI), stress echocardiogram, and lipid profile utilization were higher in the initial SCAMP clinic visit group than in age-matched control patients. Total echocardiogram and lung scan usage were similar. Chest X-ray and exercise stress testing were obtained less in SCAMP patients. ASO SCAMP patients are projected to have 0.5 clinic visits and 0.5 echocardiograms per year. Historical control patients had more clinic visits (1.2 vs. 0.5 visits/patient year, P<.01) and a higher echocardiogram rate (0.92 vs. 0.5 echocardiograms/patient year, P<.01) Implementation of a SCAMP may initially lead to increased resource utilization, but over time resource utilization is projected to decrease.

  16. Efficient utilization of energy in office buildings. Planning manual; Effiziente Energienutzung in Buerogebaeuden. Planungsleitfaden

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-15

    Regarding to the energy efficiency of office buildings, a high standard is set to architects: Office buildings need more energy for the cooling in the summer than for the heating in the winter. Additionally, there is an energy consumption for lighting, ventilation and operation of office equipment. Under this aspect, in the planning manual under consideration ten demands for an efficient energy utilization at office buildings are described: (a) Integral concept for the minimization of the entire power demand; (b) Compact building method and very good structural thermal protection; (c) Adapted glass areas and quality of vitrifications; (d) Integrals ventilation planning; (e) Efficient ventilation systems; (f) Efficient room climate concept and minimization of internal and outside heat loads; (g) Utilization of daylight with adapted architectural draft; (h) Efficient artificial lighting; (i) Supply of warmth and coldness with minimum characteristic values for primary energy; (j) Energy monitoring and optimization of operation. This manual also is valid for other buildings such as schools, administration buildings or swimming pools.

  17. Evolution of strategic risks under future scenarios for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2016-01-01

    Integrated, long-term risk management in the water sector is poorly developed. Whilst scenario planning has been applied to singular issues (e.g. climate change), it often misses a link to risk management because the likelihood of impacts in the long-term are frequently unaccounted for in these analyses. Here we apply the morphological approach to scenario development for a case study utility, Empresa Portuguesa das Águas Livres (EPAL). A baseline portfolio of strategic risks threatening the achievement of EPAL's corporate objectives was evolved through the lens of three future scenarios, 'water scarcity', 'financial resource scarcity' and 'strong economic growth', built on drivers such as climate, demographic, economic, regulatory and technological changes and validated through a set of expert workshops. The results represent how the baseline set of risks might develop over a 30 year period, allowing threats and opportunities to be identified and enabling strategies for master plans to be devised. We believe this to be the first combined use of risk and futures methods applied to a portfolio of strategic risks in the water utility sector. Copyright © 2015 Elsevier Ltd. All rights reserved.

  18. Regional health care planning: a methodology to cluster facilities using community utilization patterns.

    Science.gov (United States)

    Delamater, Paul L; Shortridge, Ashton M; Messina, Joseph P

    2013-08-22

    Community-based health care planning and regulation necessitates grouping facilities and areal units into regions of similar health care use. Limited research has explored the methodologies used in creating these regions. We offer a new methodology that clusters facilities based on similarities in patient utilization patterns and geographic location. Our case study focused on Hospital Groups in Michigan, the allocation units used for predicting future inpatient hospital bed demand in the state's Bed Need Methodology. The scientific, practical, and political concerns that were considered throughout the formulation and development of the methodology are detailed. The clustering methodology employs a 2-step K-means + Ward's clustering algorithm to group hospitals. The final number of clusters is selected using a heuristic that integrates both a statistical-based measure of cluster fit and characteristics of the resulting Hospital Groups. Using recent hospital utilization data, the clustering methodology identified 33 Hospital Groups in Michigan. Despite being developed within the politically charged climate of Certificate of Need regulation, we have provided an objective, replicable, and sustainable methodology to create Hospital Groups. Because the methodology is built upon theoretically sound principles of clustering analysis and health care service utilization, it is highly transferable across applications and suitable for grouping facilities or areal units.

  19. Fundamental plan of atomic energy development and utilization in fiscal year 1986

    International Nuclear Information System (INIS)

    1986-01-01

    The Prime Minister made the fundamental plan of atomic energy development and utilization in fiscal year 1986 based on the decision of Nuclear Safety Commission on March 13, 1986, and the decision of Atomic Energy Commission on March 18, 1986, in conformity with the law concerning Japan Atomic Energy Research Institute, and asked the opinion of Nuclear Safety Commission. After the deliberation, the Nuclear Safety Commission made the report same as the original draft on March 27, 1986. The outline of the measures taken in fiscal year 1986 is as follows. The strengthening of the measures for ensuring safety, the promotion of nuclear power generation, the establishment of nuclear fuel cycle, the development of the reactors of new types, the research on nuclear fusion, the research and development of nuclear-powered ships, the promotion of the utilization of radiation, the strengthening of the base for atomic energy development and utilization, the promotion of international cooperation, and the strengthening of safeguard measures and the countermeasures for the protection of nuclear substances. The total budget related to atomic energy for fiscal year 1986 is 357.3 billion yen. (Kako, I.)

  20. Maternal and child health and family planning service utilization in Guatemala: implications for service integration.

    Science.gov (United States)

    Seiber, Eric E; Hotchkiss, David R; Rous, Jeffrey J; Berruti, Andrés A

    2005-07-01

    Does the utilization of modern maternal and child health (MCH) services influence subsequent contraceptive use? The answer to this question holds important implications for proposals which advocate MCH and family planning service integration. This study uses data from the 1995/6 Guatemalan Demographic Health Survey and its 1997 Providers Census to test the influence of MCH service utilization on individual contraceptive use decisions. We use a full-information maximum likelihood regression model to control for unobserved heterogeneity. This model produces estimates of the MCH effect, independent of individual women's underlying receptiveness to MCH and contraceptive messages. The results of the analysis indicate that the intensity of MCH service use is indeed positively associated with subsequent contraceptive use among Guatemalan women, even after controlling for observed and unobserved individual- , household- , and community-level factors. Importantly, this finding holds even after controlling for the unobserved factors that 'predispose' some women to use both types of services. Simulations reveal that, for these Guatemalan women, key determinants such as age and primary schooling work indirectly through MCH service use to increase contraceptive utilization.

  1. Integrated employee assistance program/managed behavioral health plan utilization by persons with substance use disorders.

    Science.gov (United States)

    Merrick, Elizabeth S Levy; Hodgkin, Dominic; Hiatt, Deirdre; Horgan, Constance M; Greenfield, Shelly F; McCann, Bernard

    2011-04-01

    New federal parity and health reform legislation, promising increased behavioral health care access and a focus on prevention, has heightened interest in employee assistance programs (EAPs). This study investigated service utilization by persons with a primary substance use disorder (SUD) diagnosis in a managed behavioral health care (MBHC) organization's integrated EAP/MBHC product (N = 1,158). In 2004, 25.0% of clients used the EAP first for new treatment episodes. After initial EAP utilization, 44.4% received no additional formal services through the plan, and 40.4% received regular outpatient services. Overall, outpatient care, intensive outpatient/day treatment, and inpatient/residential detoxification were most common. About half of the clients had co-occurring psychiatric diagnoses. Mental health service utilization was extensive. Findings suggest that for service users with primary SUD diagnoses in an integrated EAP/MBHC product, the EAP benefit plays a key role at the front end of treatment and is often only one component of treatment episodes. Copyright © 2011 Elsevier Inc. All rights reserved.

  2. Integrated EAP/Managed Behavioral Health Plan Utilization by Persons with Substance Use Disorders

    Science.gov (United States)

    Levy Merrick, Elizabeth S.; Hodgkin, Dominic; Hiatt, Deirdre; Horgan, Constance M.; Greenfield, Shelly F.; McCann, Bernard

    2011-01-01

    New federal parity and health reform legislation, promising increased behavioral health care access and a focus on prevention, has heightened interest in employee assistance programs (EAPs). This study investigated service utilization by persons with a primary substance use disorder (SUD) diagnosis in a managed behavioral healthcare organization's integrated EAP/managed behavioral health care product (N=1,158). In 2004, 25.0% of clients used the EAP first for new treatment episodes. After initial EAP utilization, 44.4% received no additional formal services through the plan and 40.4% received regular outpatient services. Overall, outpatient care, intensive outpatient/day treatment, and inpatient/residential detoxification were most common. About half of clients had co-occurring psychiatric diagnoses. Mental health service utilization was extensive. Findings suggest that for service users with primary SUD diagnoses in an integrated EAP/MBHC product, the EAP benefit plays a key role at the front end of treatment and is often only one component of treatment episodes. PMID:21185684

  3. National Energy Plan 2030: a proposal for power generation expansion in the long term; Plano Nacional de Energia 2030: uma proposta de expansao para a geracao de energia eletrica no longo prazo

    Energy Technology Data Exchange (ETDEWEB)

    Guerreiro, Amilcar Goncalves; Pereira Junior, Amaro Olimpio; Lopes, Juarez Castrillon; Tavares, Marina Elisabete E.; Silva, Renata de A.M. da; Queiroz, Renato P.; Oliveira, Ricardo G. de [Empresa de Pesquisa Energetica (EPE), Brasilia, DF (Brazil)

    2008-07-01

    The article aims to present and discuss a proposal for electric energy expansion generation capacity in long term. This work identifies the most appropriate evolution of the hydrothermal mix for the expansion of the supply of electrical power in the country, over the horizon of planning by 2030. (author)

  4. Utility planning using least-cost principles and the role of externalities - staff report on a Keystone policy dialogue

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    For over two years, The Keystone Center facilitated a two-phase dialogue on Utility Planning Using Least-Cost Principles and, in the second phase, on the role of Externalities. The intent of this report is to assist policy-makers faced with decisions about changes to traditional utility regulation and planning. This report is not a consensus document, rather it is staff written summary of two years of discussion on the issues. As a concept, least-cost planning has been discussed since the 1970`s and many states have implemented such programs since the mid-1980`s. Yet, the actual goals and objectives of least-cost planning remain a source of controversy between affected interest groups. Some industry observers believe that least-cost planning can help reconcile the often conflicting demands between increased capacity requirements and concerns about the external costs of power production. In traditional utility regulation practices, capital investments are rewarded and revenue is a direct function of sales. However, a number state public utility commissions have altered their practices to allow for returns on investments in more efficient end-use equipment (also known as ratebasing conservation) and adjusting revenues to account for sales lost due to utility conservation programs. Other states are planning these types of changes. Still others are observing the impacts of the changes before they commit.

  5. Level of male involvement and associated factors in family planning services utilization among married men in Debremarkos town, Northwest Ethiopia.

    Science.gov (United States)

    Kassa, Mihretie; Abajobir, Amanuel Alemu; Gedefaw, Molla

    2014-12-02

    Men's participation is crucial to the success of family planning programs and women's empowerment and associated with better outcomes in reproductive health such as contraceptive acceptance and continuation, and safer sexual behaviors. Limited choice and access to methods, attitudes of men towards family planning, perceived fear of side-effects, poor quality of available services, cultural or religious oppositions and gender-based barriers are some of the reasons for low utilization of family planning. Hence, this study assessed the level of male involvement in family planning services utilization and its associated factors in Debremarkos town, Northwest Ethiopia. A community-based cross-sectional study was conducted from October to November, 2013. Multi-stage sampling technique was used to select 524 eligible samples. Data were collected by using semi-structured questionnaires. Epi Info and SPSS were used to enter and analyze the data; univariate, bivariate and logistic regression analyses were performed to display the outputs. Only 44 (8.4%) respondents were using or directly participating in the use of family planning services mainly male condoms. The reasons mentioned for the low participation were the desire to have more children, wife or partner refusal, fear of side effects, religious prohibition, lack of awareness about contraceptives and the thinking that it is the only issue for women. Opinion about family planning services, men approval and current use of family planning methods were associated with male involvement in the services utilization. In this study, the level of male involvement was low. Lack of information, inaccessibility to the services and the desire to have more children were found to be the reasons for low male involvement in family planning services utilization. Governmental and nongovernmental organizations, donors and relevant stakeholders should ensure availability, accessibility and sustained advocacy for use of family planning

  6. Shift systems in nuclear power plants - aspects for planning, shift systems, utility practice

    International Nuclear Information System (INIS)

    Grauf, E.

    1986-01-01

    This lecture contains the most important aspects of shift structure and shift organisation. The criteria for shift planning involving essential tasks, duties, laws and regulations, medical aspects, social aspects, will be presented. In the Federal Republic of Germany some basic models were established, which will be shown and explained with special reference to the number of teams, size of shift crews and absence regulations. Moreover, the lecture will deal with rotation systems and provisions for the transfer of shift responsibilities. By example of a utility plant commissioning time scale (1300 MW PWR) the practice of shift installations will be shown as well as the most important points of education and training. Within this compass the criteria and requirements for training and education of operational personnel in the Federal Republic of Germany will also be touched. (orig.)

  7. Utilization of a multimedia PACS workstation for surgical planning of epilepsy

    Science.gov (United States)

    Soo Hoo, Kent; Wong, Stephen T.; Hawkins, Randall A.; Knowlton, Robert C.; Laxer, Kenneth D.; Rowley, Howard A.

    1997-05-01

    Surgical treatment of temporal lobe epilepsy requires the localization of the epileptogenic zone for surgical resection. Currently, clinicians utilize electroencephalography, various neuroimaging modalities, and psychological tests together to determine the location of this zone. We investigate how a multimedia neuroimaging workstation built on top of the UCSF Picture Archiving and Communication System can be used to aid surgical planning of epilepsy and related brain diseases. This usage demonstrates the ability of the workstation to retrieve image and textural data from PACS and other image sources, register multimodality images, visualize and render 3D data sets, analyze images, generate new image and text data from the analysis, and organize all data in a relational database management system.

  8. Department of Energy plan for recovery and utilization of nuclear byproducts from defense wastes. Volume 2

    International Nuclear Information System (INIS)

    1983-08-01

    Nuclear wastes from the defense production cycle contain many uniquely useful, intrinsically valuable, and strategically important materials. These materials have a wide range of known and potential applications in food technology, agriculture, energy, public health, medicine, industrial technology, and national security. Furthermore, their removal from the nuclear waste stream can facilitate waste management and yield economic, safety, and environmental advantages in the management and disposal of the residual nuclear wastes that have no redemptive value. This document is the program plan for implementing the recovery and beneficial use of these valuable materials. An Executive Summary of this document, DOE/DP-0013, Vol. 1, January 1983, is available. Program policy, goals and strategy are stated in Section 2. Implementation tasks, schedule and funding are detailed in Section 3. The remaining five sections and the appendixes provide necessary background information to support these two sections. Section 4 reviews some of the unique properties of the individual byproduct materials and describes both demonstrated and potential applications. The amounts of byproduct materials that are available now for research and demonstration purposes, and the amounts that could be recovered in the future for expanded applications are detailed in Section 5. Section 6 describes the effects byproduct recovery and utilization have on the management and final disposal of nuclear wastes. The institutional issues that affect the recovery, processing and utilization of nuclear byproducts are discussed in Section 7. Finally, Section 8 presents a generalized mathematical process by which applications can be evaluated and prioritized (rank-ordered) to provide planning data for program management

  9. Department of Energy plan for recovery and utilization of nuclear byproducts from defense wastes. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1983-08-01

    Nuclear wastes from the defense production cycle contain many uniquely useful, intrinsically valuable, and strategically important materials. These materials have a wide range of known and potential applications in food technology, agriculture, energy, public health, medicine, industrial technology, and national security. Furthermore, their removal from the nuclear waste stream can facilitate waste management and yield economic, safety, and environmental advantages in the management and disposal of the residual nuclear wastes that have no redemptive value. This document is the program plan for implementing the recovery and beneficial use of these valuable materials. An Executive Summary of this document, DOE/DP-0013, Vol. 1, January 1983, is available. Program policy, goals and strategy are stated in Section 2. Implementation tasks, schedule and funding are detailed in Section 3. The remaining five sections and the appendixes provide necessary background information to support these two sections. Section 4 reviews some of the unique properties of the individual byproduct materials and describes both demonstrated and potential applications. The amounts of byproduct materials that are available now for research and demonstration purposes, and the amounts that could be recovered in the future for expanded applications are detailed in Section 5. Section 6 describes the effects byproduct recovery and utilization have on the management and final disposal of nuclear wastes. The institutional issues that affect the recovery, processing and utilization of nuclear byproducts are discussed in Section 7. Finally, Section 8 presents a generalized mathematical process by which applications can be evaluated and prioritized (rank-ordered) to provide planning data for program management.

  10. Planning model for hydraulic and thermic generation systems expansion under uncertainly conditions and financial restrictions; Modelo de planejamento da expansao de sistemas hidrotermicos sob incertezas e restricoes financeiras

    Energy Technology Data Exchange (ETDEWEB)

    Gorenstin, B.G.; Costa, J.P. da [CEPEL, Rio de Janeiro, RJ (Brazil); Pereira, M.V.F.; Campodonico, N.M.

    1993-12-31

    This issue presents a methodology for planning the systems expansion of hydraulic and thermic power generation associated considering several uncertainly factors, such as: demand growing, fuel costs, delays on the work construction, financial restrictions, etc. The solution focus is based on stock optimize techniques, decision analysis. This work is being developed by the Brazilian Electrical Centre (ELETROBRAS) and rely on the Energy Latin-American Organization (OLADE), Development Inter-American Bank (BID), World Bank (BIRD) and International Energy Agency (IAEA) support. An example case with Costa Rica system is also discussed 19 refs., 4 figs., 2 tabs.

  11. Measuring the costs of photovoltaics in an electric utility planning framework

    International Nuclear Information System (INIS)

    Awerbuch, Shimon

    1993-01-01

    Utility planning models evaluate alternative generating options using the revenue requirements method-an engineering-oriented, discounted cash-flow (DCF) methodology that has been widely used for over three decades. Discounted cash-flow techniques were conceived in the context of active expense-intensive technologies, such as conventional, fuel-intensive power generation. Photovoltaic (PV) technology, by contrast, is passive and capital intensive-attributes that are similar to those of other new process technologies, such as computer-integrated manufacturing. Discounted cash-flow techniques have a dismal record for correctly valuing new technologies with these attributes, in part because their benefits cannot be easily measured using traditional accounting concepts. This paper examines how these issues affect cost measurement in both conventional and PV-based electricity, and presents kWh-cost estimates for three technologies (coal, gas and PV) using risk-adjusted approaches, which suggest that PV costs are generally equivalent to the gas/combined cycle and about twice the cost of base-load coal (environmental externalities are ignored). Finally, the paper evaluates independent power purchases for a typical US utility and finds that in such a setting the cost of PV-based power is comparable to the firm's published avoided costs. (author)

  12. Basic plans of atomic energy development and utilization for fiscal 1978

    International Nuclear Information System (INIS)

    1978-01-01

    The Government has promoted the development and utilization of atomic energy as one of the most important measures for energy supplies. In Japan, due to the unrest concerning safety of nuclear power, siting of nuclear power plants is difficult, thereby the nuclear power generation program is delayed. Then, in major research and development projects such as those of uranium enrichment, fast breeder reactors, an advanced thermal reactor and nuclear fusion, while the remarkable results are being accumulated, the practical aspects are in need of positive governmental measures. Under this situation, the long range program of atomic energy development and utilization is being revised. For the fiscal year 1978 (from April, 1978 to March, 1979), based on the revision, the basic plans are presented, first, the basic policy, and second, the practical measures: strengthening of the safety measures; establishment of the nuclear fuel cycle; development of the new types of power reactors; promotion of the basic researches; securing of the people's understanding and cooperation. (Mori, K

  13. Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.; Hill, L.J. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.]|[Oak Ridge National Lab., TN (United States). Energy Div.

    1995-11-01

    Performance-Based Ratemaking (PBR) is a form of utility regulation that strengthens the financial incentives to lower rates, lower costs, or improve nonprice performance relative traditional regulation, which the authors call cost-of-service, rate-of-return (COS/ROR) regulation. Although the electric utility industry has considerable experience with incentive mechanisms that target specific areas of performance, implementation of mechanisms that cover a comprehensive set of utility costs or services is relatively rare. In recent years, interest in PBR has increased as a result of growing dissatisfaction with COS/ROR and as a result of economic and technological trends that are leading to more competition in certain segments of the electricity industry. In addition, incentive regulation has been used with some success in other public utility industries, most notably telecommunications in the US and telecommunications, energy, and water in the United Kingdom. In this report, the authors analyze comprehensive PBR mechanisms for electric utilities in four ways: (1) they describe different types of PBR mechanisms, (2) they review a sample of actual PBR plans, (3) they consider the interaction of PBR and utility-funded energy efficiency programs, and (4) they examine how PBR interacts with electric utility resource planning and industry restructuring. The report should be of interest to technical staff of utilities and regulatory commissions that are actively considering or designing PBR mechanisms. 16 figs., 17 tabs.

  14. Space Resource Utilization: Near-Term Missions and Long-Term Plans for Human Exploration

    Science.gov (United States)

    Sanders, Gerald B.

    2015-01-01

    A primary goal of all major space faring nations is to explore space: from the Earth with telescopes, with robotic probes and space telescopes, and with humans. For the US National Aeronautics and Space Administration (NASA), this pursuit is captured in three important strategic goals: 1. Ascertain the content, origin, and evolution of the solar system and the potential for life elsewhere, 2. Extend and sustain human activities across the solar system (especially the surface of Mars), and 3. Create innovative new space technologies for exploration, science, and economic future. While specific missions and destinations are still being discussed as to what comes first, it is imperative for NASA that it foster the development and implementation of new technologies and approaches that make space exploration affordable and sustainable. Critical to achieving affordable and sustainable human exploration beyond low Earth orbit (LEO) is the development of technologies and systems to identify, extract, and use resources in space instead of bringing everything from Earth. To reduce the development and implementation costs for space resource utilization, often called In Situ Resource Utilization (ISRU), it is imperative to work with terrestrial mining companies to spin-in/spin-off technologies and capabilities, and space mining companies to expand our economy beyond Earth orbit. In the last two years, NASA has focused on developing and implementing a sustainable human space exploration program with the ultimate goal of exploring the surface of Mars with humans. The plan involves developing technology and capability building blocks critical for sustained exploration starting with the Space Launch System (SLS) and Orion crew spacecraft and utilizing the International Space Station as a springboard into the solar system. The evolvable plan develops and expands human exploration in phases starting with missions that are reliant on Earth, to performing ever more challenging and

  15. Utilizing knowledge from prior plans in the evaluation of quality assurance

    International Nuclear Information System (INIS)

    Stanhope, Carl; Wu, Q Jackie; Yuan, Lulin; Liu, Jianfei; Hood, Rodney; Yin, Fang-Fang; Adamson, Justus

    2015-01-01

    Increased interest regarding sensitivity of pre-treatment intensity modulated radiotherapy and volumetric modulated arc radiotherapy (VMAT) quality assurance (QA) to delivery errors has led to the development of dose-volume histogram (DVH) based analysis. This paradigm shift necessitates a change in the acceptance criteria and action tolerance for QA. Here we present a knowledge based technique to objectively quantify degradations in DVH for prostate radiotherapy.Using machine learning, organ-at-risk (OAR) DVHs from a population of 198 prior patients’ plans were adapted to a test patient’s anatomy to establish patient-specific DVH ranges. This technique was applied to single arc prostate VMAT plans to evaluate various simulated delivery errors: systematic single leaf offsets, systematic leaf bank offsets, random normally distributed leaf fluctuations, systematic lag in gantry angle of the mutli-leaf collimators (MLCs), fluctuations in dose rate, and delivery of each VMAT arc with a constant rather than variable dose rate.Quantitative Analyses of Normal Tissue Effects in the Clinic suggests V 75Gy dose limits of 15% for the rectum and 25% for the bladder, however the knowledge based constraints were more stringent: 8.48   ±   2.65% for the rectum and 4.90   ±   1.98% for the bladder. 19   ±   10 mm single leaf and 1.9   ±   0.7 mm single bank offsets resulted in rectum DVHs worse than 97.7% (2σ) of clinically accepted plans. PTV degradations fell outside of the acceptable range for 0.6   ±   0.3 mm leaf offsets, 0.11   ±   0.06 mm bank offsets, 0.6   ±   1.3 mm of random noise, and 1.0   ±   0.7° of gantry-MLC lag.Utilizing a training set comprised of prior treatment plans, machine learning is used to predict a range of achievable DVHs for the test patient’s anatomy. Consequently, degradations leading to statistical outliers may be identified. A

  16. A multistage framework for reliability-based distribution expansion planning considering distributed generations by a self-adaptive global-based harmony search algorithm

    International Nuclear Information System (INIS)

    Shivaie, Mojtaba; Ameli, Mohammad T.; Sepasian, Mohammad S.; Weinsier, Philip D.; Vahidinasab, Vahid

    2015-01-01

    In this paper, the authors present a new multistage framework for reliability-based Distribution Expansion Planning (DEP) in which expansion options are a reinforcement and/or installation of substations, feeders, and Distributed Generations (DGs). The proposed framework takes into account not only costs associated with investment, maintenance, and operation, but also expected customer interruption cost in the optimization as four problem objectives. At the same time, operational restrictions, Kirchhoff's laws, radial structure limitation, voltage limits, and capital expenditure budget restriction are considered as problem constraints. The proposed model is a non-convex optimization problem having a non-linear, mixed-integer nature. Hence, a hybrid Self-adaptive Global-based Harmony Search Algorithm (SGHSA) and Optimal Power Flow (OPF) were used and followed by a fuzzy satisfying method in order to obtain the final optimal solution. The SGHSA is a recently developed optimization algorithm which imitates the music improvisation process. In this process, the harmonists improvise their instrument pitches, searching for the perfect state of harmony. The planning methodology was demonstrated on the 27-node, 13.8-kV test system in order to demonstrate the feasibility and capability of the proposed model. Simulation results illustrated the sufficiency and profitableness of the newly developed framework, when compared with other methods. - Highlights: • A new multistage framework is presented for reliability-based DEP problem. • In this paper, DGs are considered as an expansion option to increase the flexibility of the proposed model. • In this paper, effective factors of DEP problem are incorporated as a multi-objective model. • In this paper, three new algorithms HSA, IHSA and SGHSA are proposed. • Results obtained by the proposed SGHSA algorithm are better than others

  17. Planning the expansion of distribution: technical and regulatory considerations; Planejamento da expansao da distribuicao: consideracoes tecnicas e regulatorias

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira; Haddad, Jamil; Cruz, Ricardo Alexandre Passos da [Universidade Federal de Itajuba (EXCEN/UNIFEI), MG (Brazil). Centro de Excelencia em Eficiencia Energetica, Recursos Naturais e Energia

    2008-07-01

    The article presents the basis for the new planning of power distribution highlighting the beginning of the public hearing process for the creation of PRODIST: Procedures for Distribution of Electric Power by the ANEEL - National Agency of Electrical Energy.

  18. OPEN COURSEWARE IN DESIGN AND PLANNING EDUCATION AND UTILIZATION OF DISTANCE EDUCATION OPPORTUNITY: Anadolu University Experience

    Directory of Open Access Journals (Sweden)

    Hicran Hanım HALAC

    2013-01-01

    Full Text Available Depending on the evolving technological possibilities, distance and online education applications have gradually gained more significance in the education system. Regarding the issues, such as advancements in the server services, disc capacity, cloud computing opportunities resulting from the increase in the number of the broadband internet users, web design applications; and increase in the number of mobile device and social media users and the time spent on the internet, traditional reading and working habits as well as the preferred information resources of man have considerably changed. In accordance with these changes, it has become an inevitable necessity to improve the higher education courses and learning materials. Any higher education system, which fails to keep up with these requirements, will inevitably have difficulties in providing the students with the necessary knowledge and skills within an appropriate workload frame. Within this context, one of the fields to benefit from distance and online education opportunities is undoubtedly “architecture and design education”. Although the use of computer technologies is inevasible and highly intensive in this field, the speed of conformance with the rapid technological changes and the adoption of the advancements is considerably slow compared to others. However, it is still among the fields where the technological opportunities are utilized at most. Thereby, distance and online education technologies present an essential potential to help students achieve the required planning and architectural knowledge and skills. In this respect, this article evaluates the distance and online education opportunities for design and planning education through the experience of Anadolu University.

  19. Countywide Evaluation of the Long-Term Family Self-Sufficiency Plan. Assessing the Utility of the LTFSS Plan Service Delivery and Planning Framework

    National Research Council Canada - National Science Library

    Davis, Lois

    2002-01-01

    ...) is the lead agency responsible for implementing the evaluation of the LTFSS Plan. On December 5, 2000, the Board approved the implementation plan for the evaluation of the LTFSS Plan, LTFSS Project #46...

  20. Technical papers presented at the 4. symposium of specialists in electric operational and expansion planning. v. 2; Artigos tecnicos apresentados no 4. simposio de especialistas em planejamento da operacao e expansao eletrica. v. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This symposium about electric operational and expansion planning presents several articles that approaches issues such as, monitoring the power system stability, electrical load modelling, reliability in power systems, optimization in power systems, integrated resources planning in power systems, reactive control through static compensators, power flow analysis, system modelling, etc

  1. Factors Affecting Utilization of Family Planning Services in a Post-Conflict Setting, South Sudan: A Qualitative Study.

    Science.gov (United States)

    Ahmed, Waled Amen Mohammed; Shokai, Sara Boutros; Abduelkhair, Insaf Hassan; Boshra, Amira Yahia

    2015-01-01

    This study aims to explore and examine the conjectures surrounding the utilization of family planning services among currently married couples of childbearing age in Renk County. This study has adopted a qualitative method to collect data on factors affecting the utilization of family planning services through focus group discussions and in-depth interviews, in rural and urban areas of Renk County. It targeted married women, men as well as unmarried men and women. The researchers conducted nine focus group discussions and nine interviews at both Jelhak (rural setting) and Renk (urban setting). The results suggested that the people of Renk County prefer to have large families and therefore choose not to use family planning methods. The data collected was analyzed by means of thematic analysis. This included the construction of a thematic framework, coding, editing and categorization of available data as well as the creation of sub-themes. The result also suggested that perception is a main factor that affects utilization of family planning services with a majority of the people in Renk and Jelhak preferring to have many children in order to increase the family size for some reasons. These are linked to religion, social stigma and taboo that are attached to childless people or users of family planning methods for birth control purposes. The responses revealed some variation in perception between rural (Jelhak) and urban (Renk) areas. Respondents from Renk area reported that some people use family planning services for economic reasons that involve alleviation of financial difficulties and provision of better education when the family size is small. On the other hand, rural people from Jelhak perceive family planning to be socially un-acceptable. Furthermore, men and women of Jelhak reported that after each birth of a child, married couples avoid sexual relationship for a period of two years as means of family planning. Women of both Urban and Rural settings reported

  2. Costs and utilization of public sector family planning services in Pakistan.

    Science.gov (United States)

    Abbas, Khadija; Khan, Adnan Ahmad; Khan, Ayesha

    2013-04-01

    The public sector provides a third of family planning (FP) services in Pakistan. However, these services are viewed as being underutilized and expensive. We explored the utilization patterns and costs of FP services in the public sector. We used overall budgets and time allocation by health and population departments to estimate the total costs of FP by these departments, costs per woman served, and costs per couple-year of protection (CYP). The public sector is the predominant provider of FP to the poorest and is the main provider of female sterilization services. The overall costs of FP in the public sector are USD 55 per woman served, annually (USD 17 per CYP). Within the public sector, the population welfare departments provide services at USD 72 per woman served, annually (USD 17 per CYP) and the health departments at USD 39 per woman per year (USD 29 per CYP). While the public sector has a critical niche in serving the poor and providing female sterilization, its services are considerably more expensive compared to international and even some Pakistani non-government organization (NGO) costs. This reflects inefficiencies in services provided, client mistrust in the quality of services provided, and inadequate referrals, and will require specific actions for improving referrals and the quality of services.

  3. International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

    Science.gov (United States)

    Hernandez-Pellerano, Amri; Iannello, Christopher J.; Garrett, Henry B.; Ging, Andrew T.; Katz, Ira; Keith, R. Lloyd; Minow, Joseph I.; Willis, Emily M.; Schneider, Todd A.; Whittlesey, Edward J.; hide

    2014-01-01

    The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the

  4. Utilizing the Six Realms of Meaning in Improving Campus Standardized Test Scores through Team Teaching and Strategic Planning

    Science.gov (United States)

    Stevenson, Rosnisha D.; Kritsonis, William Allan

    2009-01-01

    This article will seek to utilize Dr. William Allan Kritsonis' book "Ways of Knowing Through the Realms of Meaning" (2007) as a framework to improve a campus's standardized test scores, more specifically, their TAKS (Texas Assessment of Knowledge and Skills) scores. Many campuses have an improvement plan, also known as a Campus…

  5. Regulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model

    Directory of Open Access Journals (Sweden)

    F. Misaghi

    2017-06-01

    Full Text Available In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind power. The problem is modelled as a bi-level stochastic optimization problem, where the upper level consists of investor's decisions maximizing its own profit. Both market clearing and decision on upgrading of transmission substation aiming at minimizing the total cost are considered in the lower level. Due to non-convexity of the lower level and impossibility of converting to single level problem (i.e. mathematical programming with equilibrium constraints (MPEC, an algorithm combing enumeration and mathematical optimization is used to tackle with the non-convexity. For each upgrading strategy of substations, a stochastic MPEC, converted to a mixed integer linear programming (MILP is solved. The proposed model is examined on a six-bus and an actual network. Numerical studies confirm that the proposed model can be used for analysing investment behaviour of DGs and substation expansion.

  6. An radiotoxicity evaluation of high level wastes for a scenery of Brazilian Nuclear Power Plants in accordance with the Energy Expansion Brazilian Plan 2030

    International Nuclear Information System (INIS)

    Guilhem, Andres C.; Maiorino, Jose R.

    2011-01-01

    This paper is a part of the author scientific initiation, and makes an evaluation of the radiotoxicity which would be produced by the Brazilian nuclear power plants in a scenery of 7 power plants operating in 2030, in according to the official expansion plans which point out the additional introduction of 4000 MW(e), or 4 ne power plant additionally to the Angra I, II and III. Considering that all reactors would be a PWR reactors. The calculated parameter was the relative toxicity of the low and intermediate level nuclear wastes (LLPP - long lived fission products and HLW - high level waste related to the radiotoxicity of natural uranium versus time. All the calculation used the ORIGEN-S code. (author)

  7. An integrated GIS environment enhancing the operation and planning of power utilities

    International Nuclear Information System (INIS)

    Yared, George Antoine

    1996-05-01

    The evolution of electrical power systems was tightly geared by the development of two fields: power engineering, with the advanced technology of physical elements comprising all parts of a power system, and information processing tools to manage the performance of electric power utilities. Compared to power engineering that has gone through tremendous developments, information technology applications for electrical power systems are relatively young. The possible improvements of these applications are in their graphical, mapping an data analysis capabilities. State-of-the art information technology such as Geographic Information Systems provides these facilities. The objective of this thesis is to devise a technique that combines power system software tools with the Geographic Information Systems software to enhance the operation, control and planning of electrical transmission systems. The load flow, voltage control and fault analysis models for the transmission system will be re-engineered in a Geographic Information System environment.The research is generic, special attention is given to its application to the Lebanese electrical power system, which is recovering from an infrastructure devastating war. The research entails integrating power systems analysis and control package, or PSACP developed at the AUB within a Geographic Information Systems environment. This will enhance the power modeling capabilities by the use of powerful thematic mapping, geographic and data analysis and user interface techniques that come with Geographic Information Systems. An overview of the two technologies involved is presented, followed by a detailed description of the integration technique before describing the integrated system. Moving to a higher level, the features of the system are presented, followed by sample applications of the integrated system on the Lebanese electrical power system. The thesis contributes to the research arena by developing a software re

  8. Utilizing patient geographic information system data to plan telemedicine service locations.

    Science.gov (United States)

    Soares, Neelkamal; Dewalle, Joseph; Marsh, Ben

    2017-09-01

    To understand potential utilization of clinical services at a rural integrated health care system by generating optimal groups of telemedicine locations from electronic health record (EHR) data using geographic information systems (GISs). This retrospective study extracted nonidentifiable grouped data of patients over a 2-year period from the EHR, including geomasked locations. Spatially optimal groupings were created using available telemedicine sites by calculating patients' average travel distance (ATD) to the closest clinic site. A total of 4027 visits by 2049 unique patients were analyzed. The best travel distances for site groupings of 3, 4, 5, or 6 site locations were ranked based on increasing ATD. Each one-site increase in the number of available telemedicine sites decreased minimum ATD by about 8%. For a given group size, the best groupings were very similar in minimum travel distance. There were significant differences in predicted patient load imbalance between otherwise similar groupings. A majority of the best site groupings used the same small number of sites, and urban sites were heavily used. With EHR geospatial data at an individual patient level, we can model potential telemedicine sites for specialty access in a rural geographic area. Relatively few sites could serve most of the population. Direct access to patient GIS data from an EHR provides direct knowledge of the client base compared to methods that allocate aggregated data. Geospatial data and methods can assist health care location planning, generating data about load, load balance, and spatial accessibility. © The Author 2017. Published by Oxford University Press on behalf of the American Medical Informatics Association. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  9. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants: Criteria for utility offsite planning and preparedness: Final report

    International Nuclear Information System (INIS)

    Podolak, E.M. Jr.; Sanders, M.E.; Wingert, V.L.; Donovan, R.W.

    1988-09-01

    The Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) have added a supplement to NUREG-0654/FEMA-REP-1, Rev. 1 that provides guidance for the development, review, and evaluation of utility offsite radiological emergency response planning and preparedness for those situations in which state and/or local governments decline to participate in emergency planning. While this guidance primarily applies to plants that do not have full-power operating licenses, it does have relevance to operating nuclear power plants

  10. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1985-08-01

    The Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The Guidelines allow for individual approaches to organizational structures to account for differences in plant size, number of operating units, number of plant sites, and the individual utility approach to providing technical support. These unique approaches, however, should meet the criteria of a reasoned, fully developed, and logically consistent focus on the user's organization in terms of organization of work, policies and procedures, staffing, and external relationships

  11. Optimization in the utility maximization framework for conservation planning: a comparison of solution procedures in a study of multifunctional agriculture

    Science.gov (United States)

    Kreitler, Jason R.; Stoms, David M.; Davis, Frank W.

    2014-01-01

    Quantitative methods of spatial conservation prioritization have traditionally been applied to issues in conservation biology and reserve design, though their use in other types of natural resource management is growing. The utility maximization problem is one form of a covering problem where multiple criteria can represent the expected social benefits of conservation action. This approach allows flexibility with a problem formulation that is more general than typical reserve design problems, though the solution methods are very similar. However, few studies have addressed optimization in utility maximization problems for conservation planning, and the effect of solution procedure is largely unquantified. Therefore, this study mapped five criteria describing elements of multifunctional agriculture to determine a hypothetical conservation resource allocation plan for agricultural land conservation in the Central Valley of CA, USA. We compared solution procedures within the utility maximization framework to determine the difference between an open source integer programming approach and a greedy heuristic, and find gains from optimization of up to 12%. We also model land availability for conservation action as a stochastic process and determine the decline in total utility compared to the globally optimal set using both solution algorithms. Our results are comparable to other studies illustrating the benefits of optimization for different conservation planning problems, and highlight the importance of maximizing the effectiveness of limited funding for conservation and natural resource management.

  12. Plan for ecumenical hearing on the risks and potentialities of the further expansion of nuclear power programmes

    International Nuclear Information System (INIS)

    Francis, J.M.; Abrecht, P.

    1976-01-01

    The basis of the Hearing, initiated by the World Council of Churches, is explained. Some countries are planning a rapid development of nuclear power, but others are reluctant to follow this line. An outline is presented of the divergent views: those against refer to the political, social and technical problems which are being left with future generations (management of obsolete reactor systems, storage of radioactive wastes); restriction on free discussion on grounds of national security; need for international safeguards; economic questions; environmental impact; plutonium hazard of breeder reactors. Those for nuclear power argue that there is no obvious alternative way of meeting the world's power demands. Intermediate views are also presented. The Hearing received position papers prepared by specialists on the various aspects of the subject. The Hearing Group held a meeting at Sigtuna, Sweden, June 24 to 29, 1975. The text of the document they prepared and the position papers, are presented as separate papers in the present series. (U.K.)

  13. Expansion of discharge planning system in Japan: Comparison of results of a nationwide survey between 2001 and 2010

    Directory of Open Access Journals (Sweden)

    Nagata Satoko

    2012-08-01

    Full Text Available Abstract Background In response to the rapid aging of the population in Japan, many care systems have been created in quick succession. Establishment of discharge planning departments (DPDs in hospitals is one of them. In this study, we compared the distribution and characteristics of DPDs and the characteristics of the hospitals that have DPDs between 2001 and 2010 in Japan. Methods We mailed a questionnaire about the characteristics of hospitals and existence and situation of DPDs to all general hospitals with 100 or more general beds in 2001 and in 2010. Results In 2001, of the 3,268 hospitals queried, 1,568 (48.0% responded and 1,357 (41.5% were selected for data analysis. In 2010, among 2,600 hospitals, 940 hospitals (36.1% responded and 913 (35.1% met the inclusion criteria. The percentage of hospitals with DPDs increased from 30% to more than 70% between the two surveys. More departments were under the direct control of the hospital director and more physicians participated in discharge planning activities in 2010 than in 2001. In 2001, private hospitals and hospitals with an affiliated institution or agency tended to have a DPD; however, the relationship between these factors and the presence of a DPD had disappeared in 2010. Larger hospitals and hospitals with more nurses per patient tended to have a DPD both in 2001 and 2010. Conclusions Since 2008, the establishment of a DPD has been directly connected to medical fees so hospital administrators might have recognized the DPD as a “necessary and paid for” department. Having a DPD was the majority’s policy in Japan, and we must recognize the importance of quality assurance through DPDs from now on, especially in small hospitals.

  14. Awareness and pattern of utilizing family planning services among women attending urban health care center Azizabad Sukkur

    International Nuclear Information System (INIS)

    Shah, N.A.; Nisar, N.

    2008-01-01

    To assess level of awareness and pattern of utilizing family planning services among women (15-49 years) of reproductive age at Urban Health Center, Azizabad Sukkur, Sindh. A cross-sectional study was conducted from April to June 2005 at Urban Health Care Center Azizabad Sukkur. Two hundred women of reproductive age group were interviewed by using a pre tested semi structured questionnaire visiting the health care center during the study period. Information was obtained after taking informed consent regarding socio demographic characteristics, knowledge, attitude and pattern of utilizing family planning services. The data was entered and analyzed by using statistical package SPSS version 13. About 75% of women and 42.5% husbands were found illiterate, 85% women were housewives, 69.5% were married before 18 years of age and 54% had nuclear family. Regarding desired number of children women responded one child (3%), 2-3 children (11%), 4-5 (37.5%), more than five children (36%), 5.5% said that children are God gifted and 7% did not answer. About 60% of women reported use of at least one contraceptive method and 40% had never used any contraceptive method. The women who received counseling from the health care provider were 48.5% and only 6% received information through media. Religious prohibition, shortage of female staff and cost of family planning contraceptive methods were the main reasons identified for not utilizing contraceptive methods. The unsatisfactory variables were long waiting hours at the center, non-availability of contraceptive, shortage of the female staff and cost. Limited number of women was aware and practice contraception in the area and utilization of family planning services were low. The efforts should be made for providing information to couple and improving quality of family planning services in the area. (author)

  15. Site study plan for utilities and solid waste, Deaf Smith County Site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    This site plan describes utilities and solid waste studies to be conducted during the characterization of the Deaf Smith County, Texas, site for the US Department of Energy's Salt Repository Project. After utilities and solid waste information needs derived from Federal, State, and local statutes and regulations and the project specifications are briefly described, the site study plan describes the study design and rationale, the field data collection procedures and equipment, and data analysis methods and application of results, the data management strategy, the schedule of field activities, the management of the study, and the study's quality assurance program. The field data collection activities are organized into programs to characterize electrical power, natural gas, communication, water, wastewater sludge, nonradiological solid waste, nonradiological hazardous waste, and low-level radiological waste. These programs include details for the collection of project needs, identification of utilities and solid waste disposal contractor capabilities, and verification of the obtained data. Utilities and solid waste field activities will begin approximately at the time of site access. Utilities and solid waste characterization will be completed within the first year of activity. 29 refs., 6 figs., 2 tabs

  16. Health workforce planning and service expansion during an economic crisis: A case study of the national breast screening programme in Ireland.

    Science.gov (United States)

    McHugh, S M; Tyrrell, E; Johnson, B; Healy, O; Perry, I J; Normand, C

    2015-12-01

    This article aims to estimate the workforce and resource implications of the proposed age extension of the national breast screening programme, under the economic constraints of reduced health budgets and staffing levels in the Irish health system. Using a mixed method design, a purposive sample of 20 participants were interviewed and data were analysed thematically (June-September 2012). Quantitative data (programme-level activity data, screening activity, staffing levels and screening plans) were used to model potential workload and resource requirements. The analysis indicates that over 90% operational efficiency was achieved throughout the first six months of 2012. Accounting for maternity leave (10%) and sick leave (3.5%), 16.1 additional radiographers (whole time equivalent) would be required for the workload created by the age extension of the screening programme, at 90% operational efficiency. The results suggest that service expansion is possible with relatively minimal additional radiography resources if the efficiency of the skill mix and the use of equipment are improved. Investing in the appropriate skill mix should not be limited to clinical groups but should also include administrative staff to manage and support the service. Workload modelling may contribute to improved health workforce planning and service efficiency. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  17. Utility of 3D printed temporal bones in pre-surgical planning for complex BoneBridge cases.

    Science.gov (United States)

    Mukherjee, Payal; Cheng, Kai; Flanagan, Sean; Greenberg, Simon

    2017-08-01

    With the advent of single-sided hearing loss increasingly being treated with cochlear implantation, bone conduction implants are reserved for cases of conductive and mixed hearing loss with greater complexity. The BoneBridge (BB, MED-EL, Innsbruck, Austria) is an active fully implantable device with no attenuation of sound energy through soft tissue. However, the floating mass transducer (FMT) part of the device is very bulky, which limits insertion in complicated ears. In this study, 3D printed temporal bones of patients were used to study its utility in preoperative planning on complicated cases. Computed tomography (CT) scans of 16 ears were used to 3D print their temporal bones. Three otologists graded the use of routine preoperative planning provided by MED-EL and that of operating on the 3D printed bone of the patient. Data were collated to assess the advantage and disadvantage of the technology. There was a statistically significant benefit in using 3D printed temporal bones to plan surgery for difficult cases of BoneBridge surgery compared to the current standard. Surgeons preferred to have the printed bones in theatre to plan their drill sites and make the transition of the planning to the patient's operation more precise. 3D printing is an innovative use of technology in the use of preoperative planning for complex ear surgery. Surgical planning can be done on the patient's own anatomy which may help to decrease operating time, reduce cost, increase surgical precision and thus reduce complications.

  18. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    International Nuclear Information System (INIS)

    KIRKBRIDE, R.A.

    2000-01-01

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters

  19. Thermal expansion

    International Nuclear Information System (INIS)

    Yun, Y.

    2015-01-01

    Thermal expansion of fuel pellet is an important property which limits the lifetime of the fuels in reactors, because it affects both the pellet and cladding mechanical interaction and the gap conductivity. By fitting a number of available measured data, recommended equations have been presented and successfully used to estimate thermal expansion coefficient of the nuclear fuel pellet. However, due to large scatter of the measured data, non-consensus data have been omitted in formulating the equations. Also, the equation is strongly governed by the lack of appropriate experimental data. For those reasons, it is important to develop theoretical methodologies to better describe thermal expansion behaviour of nuclear fuel. In particular, first-principles and molecular dynamics simulations have been certainly contributed to predict reliable thermal expansion without fitting the measured data. Furthermore, the two theoretical techniques have improved on understanding the change of fuel dimension by describing the atomic-scale processes associated with lattice expansion in the fuels. (author)

  20. The Moroccan solar plan. A comparative analysis of CSP and PV utilization until 2020

    International Nuclear Information System (INIS)

    Richts, Christoph

    2012-01-01

    The present master thesis conducts technical and economic simulations of large-scale Photovoltaic (PV) and Concentrated Solar Power (CSP) plants for the Moroccan Solar Plan. It provides a database of performance indicators such as energy yields, capacity factors, typical efficiencies and losses of technical components, LCOE, and difference costs (DC: LCOE minus avoided costs of the conventional power system) for fixed tilted, 1-axis horizontal, 1-axis vertical and 2-axis tracking PV and CSP with no, 6, 12 and 18 full load hours of thermal storage. HelioClim irradiation data of 2005 for the sites in Ouarzazate, Ain Ben Mathar, Boujdour, Laayoune and Tarfaya is used ranging between 1,927 - 2,428 kWh/m 2 /y (DNI) and 1,968 - 2,154 kWh/m 2 /y (GHI). In the base scenario minimum LCOE are 9.6 - 5.4 EURct/kWh for PV (2012 - 2020) varying between 0.90 - 1.55 EURct/kWh among sites and technologies. CSP reaches 12.8 - 9.2 EURct/kWh and a bandwidth of 2.3 - 1.6 EURct/kWh. Average DC are lowest for horizontal 1-axis tracking (0.4 and -7.7 EURct/kWh for plants built in 2012 and 2020 respectively) and CSP with 6 hours of storage (1.3 and -3.5 EURct/kWh). PV is cheaper for all sites and technologies due to higher learning curves and less initial investment, but cannot contribute to coverage of the daily evening peak in Morocco. Four different MSP-scenarios with 2000 MW of solar energy require total investments of 3.7 - 7.5 billion EUR and yield 7.9% - 12.8% of the electricity demand in 2020 (given a growth 7%/y) depending on the ratio of PV and CSP utilization. The average LCOE are 8.3 - 11.7 EURct/kWh and the total discounted DC (10%/y) are -254 - 391 million EUR. Thus, solar energy is partly less expensive than a business-as-usual scenario. An extensive sensitivity analysis for WACC and price escalation of conventional energy shows that for only PV and only CSP scenarios in 55 and 22 out of 72 cases the DC are negative - although no environmental costs for conventional

  1. The Moroccan solar plan. A comparative analysis of CSP and PV utilization until 2020

    Energy Technology Data Exchange (ETDEWEB)

    Richts, Christoph

    2012-02-15

    The present master thesis conducts technical and economic simulations of large-scale Photovoltaic (PV) and Concentrated Solar Power (CSP) plants for the Moroccan Solar Plan. It provides a database of performance indicators such as energy yields, capacity factors, typical efficiencies and losses of technical components, LCOE, and difference costs (DC: LCOE minus avoided costs of the conventional power system) for fixed tilted, 1-axis horizontal, 1-axis vertical and 2-axis tracking PV and CSP with no, 6, 12 and 18 full load hours of thermal storage. HelioClim irradiation data of 2005 for the sites in Ouarzazate, Ain Ben Mathar, Boujdour, Laayoune and Tarfaya is used ranging between 1,927 - 2,428 kWh/m{sup 2}/y (DNI) and 1,968 - 2,154 kWh/m{sup 2}/y (GHI). In the base scenario minimum LCOE are 9.6 - 5.4 EURct/kWh for PV (2012 - 2020) varying between 0.90 - 1.55 EURct/kWh among sites and technologies. CSP reaches 12.8 - 9.2 EURct/kWh and a bandwidth of 2.3 - 1.6 EURct/kWh. Average DC are lowest for horizontal 1-axis tracking (0.4 and -7.7 EURct/kWh for plants built in 2012 and 2020 respectively) and CSP with 6 hours of storage (1.3 and -3.5 EURct/kWh). PV is cheaper for all sites and technologies due to higher learning curves and less initial investment, but cannot contribute to coverage of the daily evening peak in Morocco. Four different MSP-scenarios with 2000 MW of solar energy require total investments of 3.7 - 7.5 billion EUR and yield 7.9% - 12.8% of the electricity demand in 2020 (given a growth 7%/y) depending on the ratio of PV and CSP utilization. The average LCOE are 8.3 - 11.7 EURct/kWh and the total discounted DC (10%/y) are -254 - 391 million EUR. Thus, solar energy is partly less expensive than a business-as-usual scenario. An extensive sensitivity analysis for WACC and price escalation of conventional energy shows that for only PV and only CSP scenarios in 55 and 22 out of 72 cases the DC are negative - although no environmental costs for conventional

  2. The application of financial options theory to electric utility decision making in integrated resource planning and maintenance shutdowns

    International Nuclear Information System (INIS)

    Felder, F.

    1995-01-01

    Increased competition in wholesale power generation will allow electric utilities to use financial models to improve their decision making. This competition will result in the creation of electricity spot, futures, and forward markets, which will provide necessary information for utility executives to used advance financial tools, such as random walk models and options theory. These models will allow executives to place a value on risk. Once this value is known, executives can determine how best to manage that risk, whether by entering into financial transactions, adjusting their operational and planning decisions, or both

  3. An impact assessment of electricity and emission allowances pricing in optimised expansion planning of power sector portfolios

    International Nuclear Information System (INIS)

    Tolis, Athanasios I.; Rentizelas, Athanasios A.

    2011-01-01

    Highlights: → The impact of electricity and CO 2 allowance pricing in power sector is researched. → A stochastic programming approach without recourse is used for the optimisation. → Higher electricity prices may be proportionally beneficial for the power system. → The CO 2 allowance prices may be inversely proportionate with the expected yields. → High CO 2 allowance prices are inhibitors for conventional technology projects. -- Abstract: The present work concerns a systematic investigation of power sector portfolios through discrete scenarios of electricity and CO 2 allowance prices. The analysis is performed for different prices, from regulated to completely deregulated markets, thus representing different electricity market policies. The modelling approach is based on a stochastic programming algorithm without recourse, used for the optimisation of power sector economics under multiple uncertainties. A sequential quadratic programming routine is applied for the entire investigation period whilst the time-dependent objective function is subject to various social and production constraints, usually confronted in power sectors. The analysis indicated the optimal capacity additions that should be annually ordered from each competitive technology in order to substantially improve both the economy and the sustainability of the system. It is confirmed that higher electricity prices lead to higher financial yields of power production, irrespective of the CO 2 allowance price level. Moreover, by following the proposed licensing planning, a medium-term reduction of CO 2 emissions per MW h by 30% might be possible. Interestingly, the combination of electricity prices subsidisation with high CO 2 allowance prices may provide favourable conditions for investors willing to engage on renewable energy markets.

  4. Pro-ACT II: integrating utilization management, discharge planning, and nursing case management into the outcomes manager role.

    Science.gov (United States)

    Brett, J L; Bueno, M; Royal, N; Kendall-Sengin, K

    1997-02-01

    Building on redesign efforts that created case management, clinical care technicians, support service hosts, and pharmacy technician roles, this redesign focused on integrating case management, utilization management, and discharge planning functions into a new outcomes manager role. The authors describe the process of developing and implementing the new role and outline specific actions that eliminated redundancy and inefficiency. Results of the evaluation of the project are reviewed, including full-time equivalent and salary savings and employee and physician satisfaction improvements.

  5. COMPLEAT (Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies): A planning tool for publicly owned electric utilities. [Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies (Compleat)

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-01

    COMPLEAT takes its name, as an acronym, from Community-Oriented Model for Planning Least-Cost Energy Alternatives and Technologies. It is an electric utility planning model designed for use principally by publicly owned electric utilities and agencies serving such utilities. As a model, COMPLEAT is significantly more full-featured and complex than called out in APPA's original plan and proposal to DOE. The additional complexity grew out of a series of discussions early in the development schedule, in which it became clear to APPA staff and advisors that the simplicity characterizing the original plan, while highly desirable in terms of utility applications, was not achievable if practical utility problems were to be addressed. The project teams settled on Energy 20/20, an existing model developed by Dr. George Backus of Policy Assessment Associates, as the best candidate for the kinds of modifications and extensions that would be required. The remainder of the project effort was devoted to designing specific input data files, output files, and user screens and to writing and testing the compute programs that would properly implement the desired features around Energy 20/20 as a core program. This report presents in outline form, the features and user interface of COMPLEAT.

  6. Countywide Evaluation of the Long-Term Family Self-Sufficiency Plan. Assessing the Utility of the LTFSS Plan Service Delivery and Planning Framework

    National Research Council Canada - National Science Library

    Davis, Lois

    2002-01-01

    ...) Plan on November 16,1999. The LTFSS Plan consists of 46 projects whose goal is to promote self-sufficiency among families that are participating in the California Work Opportunity and Responsibility to Kids Act of 1997 (CalWORKS...

  7. SU-F-T-427: Utilization and Evaluation of Diagnostic CT Imaging with MAR Technique for Radiation Therapy Treatment Planning

    International Nuclear Information System (INIS)

    Xu, M; Foster, R; Parks, H; Pankuch, M

    2016-01-01

    Purpose: The objective was to utilize and evaluate diagnostic CT-MAR technique for radiation therapy treatment planning. Methods: A Toshiba-diagnostic-CT acquisition with SEMAR(Single-energy-MAR)-algorism was performed to make the metal-artifact-reduction (MAR) for patient treatment planning. CT-imaging datasets with and without SEMAR were taken on a Catphan-phantom. Two sets of CT-numbers were calibrated with the relative electron densities (RED). A tissue characterization phantom with Gammex various simulating material rods was used to establish the relationship between known REDs and corresponding CT-numbers. A GE-CT-sim acquisition was taken on the Catphan for comparison. A patient with bilateral hip arthroplasty was scanned in the radiotherapy CT-sim and the diagnostic SEMAR-CT on a flat panel. The derived SEMAR images were used as a primary CT dataset to create contours for the target, critical-structures, and for planning. A deformable registration was performed with VelocityAI to track voxel changes between SEMAR and CT-sim images. The SEMAR-CT images with minimal artifacts and high quality of geometrical and spatial integrity were employed for a treatment plan. Treatment-plans were evaluated based on deformable registration of SEMAR-CT and CT-sim dataset with assigned CT-numbers in the metal artifact regions in Eclipse v11 TPS. Results: The RED and CT-number relationships were consistent for the datasets in CT-sim and CT’s with and without SEMAR. SEMAR datasets with high image quality were used for PTV and organ delineation in the treatment planning process. For dose distribution to the PTV through the DVH analysis, the plan using CT-sim with the assigned CT-number showed a good agreement to those on deformable CT-SEMAR. Conclusion: A diagnostic-CT with MAR-algorithm can be utilized for radiotherapy treatment planning with CT-number calibrated to the RED. Treatment planning comparison and DVH shows a good agreement in the PTV and critical organs between

  8. Long expansion planning of electrical power availability in Brazil under the real options theoretical approach; Planejamento de longo prazo da expansao da oferta de energia eletrica no Brasil sob uma perspectiva da teoria das opcoes reais

    Energy Technology Data Exchange (ETDEWEB)

    Marreco, Juliana de Moraes

    2007-05-15

    This thesis considers uncertainty on the long term generation expansion planning in the Brazilian Electric System, under a Real Options Approach . First, Real Options Theory is used to demonstrate the importance of thermo power plants insertion in Brazil, through a flexibility valuation on hydrothermal system. This is the first objective of this thesis. In the second part a Real Options Model is proposed to support long term expansion studies, based in a levelized costs analysis. The adequacy of proposed models to real problem is illustrated by a case study of the Brazilian Power System. The results show the importance of the energetic matrix diversification on the Long Term Planning. In the expansion model proposed, results are in favor of higher participation of biomass, nuclear power and coal in Brazilian electricity generation matrix. (author)

  9. Personalised Care Plan Management Utilizing Guideline-Driven Clinical Decision Support Systems.

    Science.gov (United States)

    Laleci Erturkmen, Gokce Banu; Yuksel, Mustafa; Sarigul, Bunyamin; Lilja, Mikael; Chen, Rong; Arvanitis, Theodoros N

    2018-01-01

    Older age is associated with an increased accumulation of multiple chronic conditions. The clinical management of patients suffering from multiple chronic conditions is very complex, disconnected and time-consuming with the traditional care settings. Integrated care is a means to address the growing demand for improved patient experience and health outcomes of multimorbid and long-term care patients. Care planning is a prevalent approach of integrated care, where the aim is to deliver more personalized and targeted care creating shared care plans by clearly articulating the role of each provider and patient in the care process. In this paper, we present a method and corresponding implementation of a semi-automatic care plan management tool, integrated with clinical decision support services which can seamlessly access and assess the electronic health records (EHRs) of the patient in comparison with evidence based clinical guidelines to suggest personalized recommendations for goals and interventions to be added to the individualized care plans.

  10. Network level bridges maintenance planning using Multi-Attribute Utility Theory

    NARCIS (Netherlands)

    Allah Bukhsh, Zaharah; Stipanovic, Irina; Klanker, Giel; O' Connor, Alan; Doree, Andre

    2018-01-01

    Bridge infrastructure managers are facing multiple challenges to improve the availability and serviceability of ageing infrastructure, while the maintenance planning is constrained by budget restrictions. Many research efforts are ongoing, for the last few decades, ranging from development of bridge

  11. Technical papers presented at the 4. symposium of specialists in electric operational and expansion planning. v. 1; Artigos tecnicos apresentados no 4. simposio de especialistas em planejamento da operacao e expansao eletrica. v. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This document collects papers presented in the 4. Symposium of specialists in electric operation and expansion planning. The main problems affecting this sector in the world are discussed. Several cases studies are presented as well as state of the art and new developing technologies

  12. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    Energy Technology Data Exchange (ETDEWEB)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  13. The Utility of PET/CT in the Planning of External Radiation Therapy for Prostate Cancer.

    Science.gov (United States)

    Calais, Jeremie; Cao, Minsong; Nickols, Nicholas G

    2018-04-01

    Radiotherapy and radical prostatectomy are the definitive treatment options for patients with localized prostate cancer. A rising level of prostate-specific antigen after radical prostatectomy indicates prostate cancer recurrence, and these patients may still be cured with salvage radiotherapy. To maximize chance for cure, the irradiated volumes should completely encompass the extent of disease. Therefore, accurate estimation of the location of disease is critical for radiotherapy planning in both the definitive and the salvage settings. Current first-line imaging for prostate cancer has limited sensitivity for detection of disease both at initial staging and at biochemical recurrence. Integration of PET into routine evaluation of prostate cancer patients may improve both staging accuracy and radiotherapy planning. 18 F-FDG PET/CT is now routinely used in radiation planning for several cancer types. However, 18 F-FDG PET/CT has low sensitivity for prostate cancer. Additional PET probes evaluated in prostate cancer include 18 F-sodium fluoride, 11 C-acetate, 11 C- or 18 F-choline, 18 F-fluciclovine, and 68 Ga- or 18 F-labeled ligands that bind prostate-specific membrane antigen (PSMA). PSMA ligands appear to be the most sensitive and specific but have not yet received Food and Drug Administration New Drug Application approval for use in the United States. Retrospective and prospective investigations suggest a potential major impact of PET/CT on prostate radiation treatment planning. Prospective trials randomizing patients to routine radiotherapy planning versus PET/CT-aided planning may show meaningful clinical outcomes. Prospective clinical trials evaluating the addition of 18 F-fluciclovine PET/CT for planning of salvage radiotherapy with clinical endpoints are under way. Prospective trials evaluating the clinical impact of PSMA PET/CT on prostate radiation planning are indicated. © 2018 by the Society of Nuclear Medicine and Molecular Imaging.

  14. Implications of Model Structure and Detail for Utility Planning. Scenario Case Studies using the Resource Planning Model

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Barrows, Clayton [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Lopez, Anthony [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hale, Elaine [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dyson, Mark [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Eurek, Kelly [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-04-23

    We examine how model investment decisions change under different model configurations and assumptions related to renewable capacity credit, the inclusion or exclusion of operating reserves, dispatch period sampling, transmission power flow modeling, renewable spur line costs, and the ability of a planning region to import and export power. For all modeled scenarios, we find that under market conditions where new renewable deployment is predominantly driven by renewable portfolio standards, model representations of wind and solar capacity credit and interactions between balancing areas are most influential in avoiding model investments in excess thermal capacity. We also compare computation time between configurations to evaluate tradeoffs between computational burden and model accuracy. From this analysis, we find that certain advanced dispatch representations (e.g., DC optimal power flow) can have dramatic adverse effects on computation time but can be largely inconsequential to model investment outcomes, at least at the renewable penetration levels modeled. Finally, we find that certain underappreciated aspects of new capacity investment decisions and model representations thereof, such as spur lines for new renewable capacity, can influence model outcomes particularly in the renewable technology and location chosen by the model. Though this analysis is not comprehensive and results are specific to the model region, input assumptions, and optimization-modeling framework employed, the findings are intended to provide a guide for model improvement opportunities.

  15. Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 2, Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States); Hill, L.J. [Oak Ridge National Lab., TN (United States)

    1995-11-01

    This document contains summaries of the electric utilities performance-based rate plans for the following companies: Alabama Power Company; Central Maine Power Company; Consolidated Edison of New York; Mississippi Power Company; New York State Electric and Gas Corporation; Niagara Mohawk Power Corporation; PacifiCorp; Pacific Gas and Electric; Southern California Edison; San Diego Gas & Electric; and Tucson Electric Power. In addition, this document also contains information about LBNL`s Power Index and Incentive Properties of a Hybrid Cap and Long-Run Demand Elasticity.

  16. Utilizing Strategic and Operational Methods for Whole-Community Disaster Planning.

    Science.gov (United States)

    Franks, Stevee; Seaton, Ellen

    2017-12-01

    Analysis of response and recovery efforts to disasters over the past 2 decades has identified a consistent gap that plagues the nation in regard to persons with access and functional needs. This gap can be highlighted by Hurricane Katrina, where the majority of those killed were a part of the access and functional needs population. After a disaster, many individuals with access and functional needs require assistance recovering but often have difficulty accessing services and resources. These difficulties are due to a combination of issues, such as health problems and the disruption of community support services. We sought to help bridge this gap by focusing on strategic and operational methods used while planning for the whole community. This article highlights the many partnerships that must be fostered for successful whole-community planning. These partnerships include, but are not limited to, local government departments, health agencies, nonprofit and nongovernmental organizations, and other volunteer organizations. We showcase these methods by using a developmental Post-Disaster Canvassing Plan to highlight planning methods that may aid jurisdictions across the United States in disaster planning for the whole community. (Disaster Med Public Health Preparedness. 2017;11:741-746).

  17. Improved robotic stereotactic body radiation therapy plan quality and planning efficacy for organ-confined prostate cancer utilizing overlap-volume histogram-driven planning methodology

    International Nuclear Information System (INIS)

    Wu, Binbin; Pang, Dalong; Lei, Siyuan; Gatti, John; Tong, Michael; McNutt, Todd; Kole, Thomas; Dritschilo, Anatoly; Collins, Sean

    2014-01-01

    Background and purpose: This study is to determine if the overlap-volume histogram (OVH)-driven planning methodology can be adapted to robotic SBRT (CyberKnife Robotic Radiosurgery System) to further minimize the bladder and rectal doses achieved in plans manually-created by clinical planners. Methods and materials: A database containing clinically-delivered, robotic SBRT plans (7.25 Gy/fraction in 36.25 Gy) of 425 patients with localized prostate cancer was used as a cohort to establish an organ’s distance-to-dose model. The OVH-driven planning methodology was refined by adding the PTV volume factor to counter the target’s dose fall-off effect and incorporated into Multiplan to automate SBRT planning. For validation, automated plans (APs) for 12 new patients were generated, and their achieved dose/volume values were compared to the corresponding manually-created, clinically-delivered plans (CPs). A two-sided, Wilcoxon rank-sum test was used for statistical comparison with a significance level of p < 0.05. Results: PTV’s V(36.25 Gy) was comparable: 95.6% in CPs comparing to 95.1% in APs (p = 0.2). On average, the refined approach lowered V(18.12 Gy) to the bladder and rectum by 8.2% (p < 0.05) and 6.4% (p = 0.14). A physician confirmed APs were clinically acceptable. Conclusions: The improvements in APs could further reduce toxicities observed in SBRT for organ-confined prostate cancer

  18. Electric utility system planning studies for OTEC power integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  19. [The study on behaviour of protective equipment utilization of workers exposed to benzene and factors based on Planned Behavior Theory].

    Science.gov (United States)

    Huang, J Y; Liu, C D; Zhang, W M; Fu, Y K; Ma, H Y

    2018-02-20

    Objective: To investigate and predict the behavioral intention and mode of the protective equipment utilization selection of the workers who used Benzene, the Theory of Planned Behavior (TPB) was applied to establish the behavioral model to enhance the theoretical foundation for long-term intervention. Methods: Questionnaires were used to survey the 707 workers, and all the behaviors of using protective equipment were investigated. Evaluate the relationships between each variable and obtain the influence affects by structural equation model. Results: The investigation showed that 38.47% of the total workers (272 cases) used whole body protection, 13.58% used partially, and 16.69% didn't use any body protection. There were significant difference between the varying degrees in the four dimensions (behavioral attitude, perceived behavior control, subjective norm, and behavioral intention) (Pbehavior control was the most important influencing factor, subjective norm, positive attitude, negative attitude were the other three respects in sequence. The path co-efficient were 0.600、0.215、0.141 and 0.046 respectively. Conclusion: The study show that the theory of planned behavior can effectively explain the behavioral intention and behavior of protective equipment utilization. Therefore, combining the subjective initiative of individuals with the supervision of enterprises, In order to effectively enhance the protective equipment utilization of benzene workers.

  20. Risk-Sensitive Multiagent Decision-Theoretic Planning Based on MDP and One-Switch Utility Functions

    Directory of Open Access Journals (Sweden)

    Wei Zeng

    2014-01-01

    Full Text Available In high stakes situations decision-makers are often risk-averse and decision-making processes often take place in group settings. This paper studies multiagent decision-theoretic planning under Markov decision processes (MDPs framework with considering the change of agent’s risk attitude as his wealth level varies. Based on one-switch utility function that describes agent’s risk attitude change with his wealth level, we give the additive and multiplicative aggregation models of group utility and adopt maximizing expected group utility as planning objective. When the wealth level approaches infinity, the characteristics of optimal policy are analyzed for the additive and multiplicative aggregation model, respectively. Then a backward-induction method is proposed to divide the wealth level interval from negative infinity to initial wealth level into subintervals and determine the optimal policy in states and subintervals. The proposed method is illustrated by numerical examples and the influences of agent’s risk aversion parameters and weights on group decision-making are also analyzed.

  1. Pre-surgical planning and MR-tractography utility in brain tumour resection

    Energy Technology Data Exchange (ETDEWEB)

    Romano, A.; Fantozzi, L.M.; Bozzao, A. [University Sapienza, Department of Neuroradiology, S. Andrea Hospital, Rome (Italy); D' Andrea, G.; Mastronardi, L.; Ferrante, L. [University Sapienza, Department of Neurosurgery, S. Andrea Hospital, Rome (Italy); Minniti, G. [University Sapienza, Department of Radiotherapy, S. Andrea Hospital, Rome (Italy)

    2009-12-15

    The purposes of this study were (1) to evaluate the possible identification of trajectories of fibre tracts, (2) to examine the useful of a neuronavigation system for pre-surgical planning, (3) to assess pre- and post-surgery patients' clinical condition and (4) to evaluate the impact of this information on surgical planning and procedure. Twenty-eight right-handed patients were prospectively and consecutively studied. All the patients were clinically assessed by a neurologist in both pre- and post-surgical phases. Separately the pyramidal tract, optic radiation and arcuate fasciculus were reconstructed. The trajectories were considered suitable for surgical planning if there were no interruptions of any of the layers at the level of the lesion. Dedicated software 'merged' the acquired images with the tractographic processing, and the whole dataset was sent to the neuronavigation system. The assessment of the 37 visualised trajectories close to the tumour resulted in a modification of the surgical approach to corticotomy in six patients (21%); the impact on the definition of the resection margins during surgery was 64% (18 cases). The overall impact percentage on the surgical procedure was 82%. In 27 cases, the symptoms had not changed. MR-tractography provides the neurosurgeon with a new anatomical view that has an impact on the surgical resection planning for brain neoplasms. (orig.)

  2. Developing team leadership to facilitate guideline utilization: planning and evaluating a 3-month intervention strategy.

    Science.gov (United States)

    Gifford, Wendy; Davies, Barbara; Tourangeau, Ann; Lefebre, Nancy

    2011-01-01

    Research describes leadership as important to guideline use. Yet interventions to develop current and future leaders for this purpose are not well understood. To describe the planning and evaluation of a leadership intervention to facilitate nurses' use of guideline recommendations for diabetic foot ulcers in home health care. Planning the intervention involved a synthesis of theory and research (qualitative interviews and chart audits). One workshop and three follow-up teleconferences were delivered at two sites to nurse managers and clinical leaders (n=15) responsible for 180 staff nurses. Evaluation involved workshop surveys and interviews. Highest rated intervention components (four-point scale) were: identification of target indicators (mean 3.7), and development of a team leadership action plan (mean 3.5). Pre-workshop barriers assessment rated lowest (mean 2.9). Three months later participants indicated their leadership performance had changed as a result of the intervention, being more engaged with staff and clear about implementation goals. Creating a team leadership action plan to operationalize leadership behaviours can help in delivery of evidence-informed care. Access to clinical data and understanding team leadership knowledge and skills prior to formal training will assist nursing management in tailoring intervention strategies to identify needs and gaps. © 2010 The Authors. Journal compilation © 2010 Blackwell Publishing Ltd.

  3. Pre-surgical planning and MR-tractography utility in brain tumour resection

    International Nuclear Information System (INIS)

    Romano, A.; Fantozzi, L.M.; Bozzao, A.; D'Andrea, G.; Mastronardi, L.; Ferrante, L.; Minniti, G.

    2009-01-01

    The purposes of this study were (1) to evaluate the possible identification of trajectories of fibre tracts, (2) to examine the useful of a neuronavigation system for pre-surgical planning, (3) to assess pre- and post-surgery patients' clinical condition and (4) to evaluate the impact of this information on surgical planning and procedure. Twenty-eight right-handed patients were prospectively and consecutively studied. All the patients were clinically assessed by a neurologist in both pre- and post-surgical phases. Separately the pyramidal tract, optic radiation and arcuate fasciculus were reconstructed. The trajectories were considered suitable for surgical planning if there were no interruptions of any of the layers at the level of the lesion. Dedicated software 'merged' the acquired images with the tractographic processing, and the whole dataset was sent to the neuronavigation system. The assessment of the 37 visualised trajectories close to the tumour resulted in a modification of the surgical approach to corticotomy in six patients (21%); the impact on the definition of the resection margins during surgery was 64% (18 cases). The overall impact percentage on the surgical procedure was 82%. In 27 cases, the symptoms had not changed. MR-tractography provides the neurosurgeon with a new anatomical view that has an impact on the surgical resection planning for brain neoplasms. (orig.)

  4. Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

    Energy Technology Data Exchange (ETDEWEB)

    Ling, Lawrence T. [URS-Savannah River Remediation, Savannah River Site, Building 766-H Room 2205, Aiken, SC 29808 (United States); Chew, David P. [URS-Savannah River Remediation, Savannah River Site, Building 766-H Room 2426, Aiken, SC 29808 (United States)

    2013-07-01

    The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance

  5. Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

    International Nuclear Information System (INIS)

    Ling, Lawrence T.; Chew, David P.

    2013-01-01

    The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance

  6. Impact of standardized clinical assessment and management plans on resource utilization and costs in children after the arterial switch operation.

    Science.gov (United States)

    Rathod, Rahul H; Jurgen, Brittney; Hamershock, Rose A; Friedman, Kevin G; Marshall, Audrey C; Samnaliev, Mihail; Graham, Dionne A; Jenkins, Kathy; Lock, James E; Powell, Andrew J

    2017-12-01

    Standardized Clinical Assessment and Management Plans (SCAMPs) are a quality improvement initiative designed to reduce unnecessary utilization, decrease practice variation, and improve patient outcomes. We created a novel methodology, the SCAMP managed episode of care (SMEOC), which encompasses multiple encounters to assess the impact of the arterial switch operation (ASO) SCAMP on total costs. All ASO SCAMP patients (dates March 2009 to July 2015) were compared to a control group of ASO patients (January 2001 to February 2009). Patients were divided into "younger" (operation while maintaining quality of care. © 2017 Wiley Periodicals, Inc.

  7. Plans for the utilization of a new research reactor FRM II

    International Nuclear Information System (INIS)

    Glaeser, W.

    1999-01-01

    The construction of the new research reactor FRM II is close to completion. The start of nuclear operation is planned for the year 2001. After a short description of the concept and figures of merit of the facility, the scientific instrumentation and user installations for basic and applied research (worked out largely by the German user community) being under construction will be summarized. Besides the introduction of several new techniques considerable progress in the performance of standard neutron techniques is envisaged. (author)

  8. Computerized three-dimensional treatment planning system utilizing interactive colour graphics

    Energy Technology Data Exchange (ETDEWEB)

    McShan, D L; Silverman, A; Lanza, D M; Reinstein, L E; Glicksman, A S [Rhode Island Hospital (US). Dept. of Radiation Oncology

    1979-06-01

    A new computerized radiation treatment planning system has been developed to aid in three-dimensional treatment planning. Using interactive colour graphics in conjunction with a PDP 11/45 computer, the system can take multiple transverse contours and construct a perspective display of the treatment region showing organ surfaces as well as cross-sectional contours. With interactively selected orientations, the display allows easy perception of the relative positioning of the treatment volume and the neighbouring anatomy. For external beam treatment planning, interactive computer simulation is used to select diaphragm sizes which best conform to the target area while avoiding sensitive structures. Dose calculations for the selected beams are carried out on multiple transverse planes. The calculational planes and surfaces are displayed in perspective with radiation dosage displayed in an interactively manipulated colour display. Altogether the system provides an easy assessment of the volume to be irradiated, interactive selection of optimal arrangements of treatment fields and a means of visualizing and evaluating the resulting dose distributions.

  9. Embedding Systems Thinking into EWB Project Planning and Development: Assessing the Utility of a Group Model Building Approach

    Directory of Open Access Journals (Sweden)

    Kimberly Pugel

    2017-11-01

    Full Text Available Amongst growing sociotechnical efforts, engineering students and professionals both in the international development sector and industry are challenged to approach projects more holistically to achieve project goals.  Engineering service learning organizations must similarly adapt their technological projects to consider varying cultural and economic structures, ensuring more resilient social progress within development efforts.  In practice, systems thinking approaches can be utilized to model the social, economic, political, and technological implications that influence the sustainability of an engineering project. This research assesses the utility of integrating systems thinking into Engineers Without Borders (EWB project planning and development, thereby improving project impact and more effectively engaging members.  At a workshop held at an EWB-USA 2016 Regional Conference, the authors presented a planning and evaluation framework that applies group model building with system dynamics to foster systems thinking through factor diagramming and analysis. To assess the added value of the framework for EWB project planning and development, extensive participant feedback was gathered and evaluated during the workshop and through an optional post-workshop survey.  Supported by thoughtful observations and feedback provided by the EWB members, the model building workshop appeared to help participants reveal and consider project complexities by both visually and quantitatively identifying key non-technical and technical factors that influence project sustainability.  Therefore, system dynamics applied in a group model building workshop offers a powerful supplement to traditional EWB project planning and assessment activities, providing a systems-based tool for EWB teams and partner communities to build capacity and create lasting change.

  10. Utilize target motion to cover clinical target volume (ctv) - a novel and practical treatment planning approach to manage respiratory motion

    International Nuclear Information System (INIS)

    Jin Jianyue; Ajlouni, Munther; Kong Fengming; Ryu, Samuel; Chetty, Indrin J.; Movsas, Benjamin

    2008-01-01

    Purpose: To use probability density function (PDF) to model motion effects and incorporate this information into treatment planning for lung cancers. Material and methods: PDFs were calculated from the respiratory motion traces of 10 patients. Motion effects were evaluated by convolving static dose distributions with various PDFs. Based on a differential dose prescription with relatively lower dose to the clinical target volume (CTV) than to the gross tumor volume (GTV), two approaches were proposed to incorporate PDFs into treatment planning. The first approach uses the GTV-based internal target volume (ITV) as the planning target volume (PTV) to ensure full dose to the GTV, and utilizes the motion-induced dose gradient to cover the CTV. The second approach employs an inhomogeneous static dose distribution within a minimized PTV to best match the prescription dose gradient. Results: Motion effects on dose distributions were minimal in the anterior-posterior (AP) and lateral directions: a 10-mm motion only induced about 3% of dose reduction in the peripheral target region. The motion effect was remarkable in the cranial-caudal direction. It varied with the motion amplitude, but tended to be similar for various respiratory patterns. For the first approach, a 10-15 mm motion would adequately cover the CTV (presumed to be 60-70% of the GTV dose) without employing the CTV in planning. For motions 15-mm. An example of inhomogeneous static dose distribution in a reduced PTV was given, and it showed significant dose reduction in the normal tissue without compromising target coverage. Conclusions: Respiratory motion-induced dose gradient can be utilized to cover the CTV and minimize the lung dose without the need for more sophisticated technologies

  11. Expansion dynamics

    International Nuclear Information System (INIS)

    Knoll, J.

    1985-10-01

    A quantum dynamical model is suggested which describes the expansion and disassembly phase of highly excited compounds formed in energetic heavy-ion collisions. First applications in two space and one time dimensional model world are discussed and qualitatively compared to standard freeze-out concepts. (orig.)

  12. expansion method

    Indian Academy of Sciences (India)

    of a system under investigation is to model the system in terms of some ... The organization of the paper is as follows: In §2, a brief account of the (G /G)- expansion ...... It is interesting to note that from the general results, one can easily recover.

  13. Exploring New Models for Utility Distributed Energy Resource Planning and Integration: SMUD and Con Edison

    Energy Technology Data Exchange (ETDEWEB)

    2018-01-23

    As a result of the rapid growth of renewable energy in the United States, the U.S. electric grid is undergoing a monumental shift away from its historical status quo. These changes are occurring at both the centralized and local levels and have been driven by a number of different factors, including large declines in renewable energy costs, federal and state incentives and mandates, and advances in the underlying technology. Higher levels of variable-generation renewable energy, however, may require new and increasingly complex methods for utilities to operate and maintain the grid while also attempting to limit the costly build-out of supporting grid infrastructure.

  14. A program plan addressing carpal tunnel syndrome: the utility of King's goal attainment theory.

    Science.gov (United States)

    Norgan, G H; Ettipio, A M; Lasome, C E

    1995-08-01

    1. Today's nurse is prepared to address the needs of groups of individuals who share common characteristics or risks (aggregates). Program planning skills and ability to use nursing theory can enhance the nurse's effectiveness in addressing the needs of such aggregates. 2. Carpal tunnel syndrome and other repetitive stress injuries are very costly to industry, both in terms of monetary loss and lost work hours. Such injuries can be reduced in the workplace through careful observation and communication of trends by the nurse. 3. The systems perspective of King's goal attainment theory guided the nurse in problem solving and facilitating the development of a workplace capable of responding to trends as they occur.

  15. User oriented design features of Korea Multi-purpose Research Reactor and its utilization plan

    International Nuclear Information System (INIS)

    Kim, Byungkoo; Jun, Byungjin

    1994-01-01

    Construction of a 30 MW class Korea Multi-purpose Research Reactor (KMRR) is near its completion and expected to reach initial criticality by the end of 1994 at KAERI Taejon site. As Korea will become one of developed countries during the lifetime of this reactor and many worldwide high performance research reactors of the first generation are reaching end of life, it is believed that KMRR will meet the increasing domestic needs to utilize high performance research reactor and its worldwide role will be important as well. In reactor design, effort has been focused on optimization which can satisfy various future utilization demands as much as possible with enhanced safety as a basic requirement. Light water cooled and heavy water reflected compact core using low enriched and high uranium loaded fuel, computer controlled operation, etc. are expected to provide truly multi-purpose user environments with stable high quality neutron flux. High level experimental facilities and equipment for reactor fuel and material test, various studies using neutron beam, radioisotope production, semiconductor doping, neutron activation analysis, etc., will be completed in parallel with the reactor or gradually depending on users' needs. When KMRR becomes fully operational, it will not only serve the domestic users but also be a valuable tool for a worldwide research community using a research reactor

  16. Image-Based Treatment Planning of the Post-Lumpectomy Breast Utilizing CT and 3TMRI

    International Nuclear Information System (INIS)

    Jacobson, G.; Betts, V.; Muruganandham, M.; Buechler-Price, J.; Zamba, G.

    2011-01-01

    Accurate lumpectomy cavity definition is critical in breast treatment planning. We compared contouring lumpectomy cavity volume and cavity visualization score (CVS) with CT versus 3T MRI. 29 patients were imaged with CT and 3T MRI. Seven additional boost planning sets were obtained for 36 image sets total. Three observers contoured the lumpectomy cavity on all images, assigning a cavity visualization score (CVS ) of 1 to 5. Measures of consistency and agreement for CT volumes were 98.84% and 98.62%, for T1 MRI were 95.65% and 95.55%, and for T2 MRI were 97.63% and 97.71%. The mean CT, T1 MRI, and T2 MRI CVS scores were 3.28, 3.38, and 4.32, respectively. There was a highly significant difference between CT and T2 scores (P<.00001) and between T1 and T2 scores (P<.00001). Interobserver consistency and agreement regarding volumes were high for all three modalities with T2 MRI CVS the highest. MRI may contribute to target definition in selected patients

  17. Image-Based Treatment Planning of the Post-Lumpectomy Breast Utilizing CT and 3TMRI

    Directory of Open Access Journals (Sweden)

    Geraldine Jacobson

    2011-01-01

    Full Text Available Accurate lumpectomy cavity definition is critical in breast treatment planning. We compared contouring lumpectomy cavity volume and cavity visualization score (CVS with CT versus 3T MRI. 29 patients were imaged with CT and 3T MRI. Seven additional boost planning sets were obtained for 36 image sets total. Three observers contoured the lumpectomy cavity on all images, assigning a cavity visualization score (CVS of 1 to 5. Measures of consistency and agreement for CT volumes were 98.84% and 98.62%, for T1 MRI were 95.65% and 95.55%, and for T2 MRI were 97.63% and 97.71%. The mean CT, T1 MRI, and T2 MRI CVS scores were 3.28, 3.38, and 4.32, respectively. There was a highly significant difference between CT and T2 scores (<.00001 and between T1 and T2 scores (<.00001. Interobserver consistency and agreement regarding volumes were high for all three modalities with T2 MRI CVS the highest. MRI may contribute to target definition in selected patients.

  18. Public participation in planning procedures for the expansion of extra-high voltage transmission systems under the Energy Economy Law and the Law for Accelerated Network Expansion for Transmission Systems; Buergerbeteiligung in den Planungsverfahren zum Hoechstspannungsnetzausbau nach EnWG und NABEG

    Energy Technology Data Exchange (ETDEWEB)

    Weingarten, Elke; Peters, Wolfgang [Bosch and Partner GmbH, Berlin (Germany); Mueller-Pfannenstiel, Klaus [Bosch and Partner GmbH, Herne (Germany)

    2013-05-15

    The energy turnaround necessitates an expansion of the existing power transmission grid on a large scale and within a very short time frame. These measures will in all probability not be realisable without incurring conflicts with citizens affected by them. The topic of public participation should therefore be given very high priority from the very beginning of grid construction planning by systematically providing opportunities for citizens as representatives of the public at large to participate in decision making processes.

  19. IKEA's International Expansion

    OpenAIRE

    Harapiak, Clayton

    2013-01-01

    This case concerns a global retailing firm that is dealing with strategic management and marketing issues. Applying a scenario of international expansion, this case provides a thorough analysis of the current business environment for IKEA. Utilizing a variety of methods (e.g. SWOT, PESTLE, McKinsey Matrix) the overall objective is to provide students with the opportunity to apply their research skills and knowledge regarding a highly competitive industry to develop strategic marketing strateg...

  20. Use of remote sensing techniques for inventorying and planning utilization of land resources in South Dakota

    Science.gov (United States)

    Myers, V. I.; Frazee, C. J.; Rusche, A. E.; Moore, D. G.; Nelson, G. D.; Westin, F. C.

    1974-01-01

    The basic procedures for interpreting remote sensing imagery to rapidly develop general soils and land use inventories were developed and utilized in Pennington County, South Dakota. These procedures and remote sensing data products were illustrated and explained to many user groups, some of whom are interested in obtaining similar data. The general soils data were integrated with land soils data supplied by the county director of equalization to prepare a land value map. A computer print-out of this map indicating a land value for each quarter section is being used in tax reappraisal of Pennington County. The land use data provided the land use planners with the present use of land in Pennington County. Additional uses of remote sensing applications are also discussed including tornado damage assessment, hail damage evaluation, and presentation of soil and land value information on base maps assembled from ERTS-1 imagery.

  1. Jicarilla Apache Utility Authority. Strategic Plan for Energy Efficiency and Renewable Energy Development

    International Nuclear Information System (INIS)

    Rabago, K.R.

    2008-01-01

    The purpose of this Strategic Plan Report is to provide an introduction and in-depth analysis of the issues and opportunities, resources, and technologies of energy efficiency and renewable energy that have potential beneficial application for the people of the Jicarilla Apache Nation and surrounding communities. The Report seeks to draw on the best available information that existed at the time of writing, and where necessary, draws on new research to assess this potential. This study provides a strategic assessment of opportunities for maximizing the potential for electrical energy efficiency and renewable energy development by the Jicarilla Apache Nation. The report analyzes electricity use on the Jicarilla Apache Reservation in buildings. The report also assesses particular resources and technologies in detail, including energy efficiency, solar, wind, geothermal, biomass, and small hydropower. The closing sections set out the elements of a multi-year, multi-phase strategy for development of resources to the maximum benefit of the Nation

  2. MRI imaging of fetal neck masses with airway compromise: utility in delivery planning

    Energy Technology Data Exchange (ETDEWEB)

    Kathary, N.; Bulas, D.I. [Dept. of Radiology, Children' s National Medical Center, Washington, DC (United States); Newman, K.D. [Dept. of Surgery, Children' s National Medical Center, Washington, DC (United States); Schonberg, R.L. [Dept. of Medical Genetics, Children' s National Medical Center, Washington, DC (United States)

    2001-10-01

    We present two cases of fetal neck masses that were initially diagnosed by ultrasound and further evaluated with prenatal MRI. MRI findings aided in further delineating the neck masses, increasing confidence in the final diagnosis (cervical teratoma and cystic hygroma). With the fetal airway typically filled with fluid that is of high signal on T2-weighted sequences, MRI images in three planes could identify whether the fetal larynx and trachea were partially or completely compressed by the neck tumor. This information was particularly useful in determining if a controlled delivery such as ex utero intrapartum treatment (EXIT) was necessary and aided the surgeons in planning their approach to establishing airway control in the delivery room. (orig.)

  3. Inventory and surveillance of natural resources as a contribution to land utilization planning in the Sahel

    Energy Technology Data Exchange (ETDEWEB)

    Panzer, K F

    1980-09-01

    The destructive land-use practices observed in large parts of the Sahel of West-Africa as a consequence of increasing population pressure must be replaced by sustained-yield management, e.g., by agro-sylvo-pastoral land-use systems. Information and planning aids required can only be obtained through the inventory and subsequent monitoring of the natural, renewable resources, i.e. water, range- and wood lands. Because of the extent and inaccessibility of the Sahel, an inventory design combining clustered fieldplots and large-scale aerial photography is being considered as most efficient in statistical and economical terms. Evidently, an inventory cannot solve the serious problems in the Sahel, but its results can contribute essentially towards defining better land-use policies and towards more effective management of the natural resource base.

  4. Jicarilla Apache Utility Authority Renewable Energy and Energy Efficiency Strategic Planning

    Energy Technology Data Exchange (ETDEWEB)

    Rabago, K.R.

    2008-06-28

    The purpose of this Strategic Plan Report is to provide an introduction and in-depth analysis of the issues and opportunities, resources, and technologies of energy efficiency and renewable energy that have potential beneficial application for the people of the Jicarilla Apache Nation and surrounding communities. The Report seeks to draw on the best available information that existed at the time of writing, and where necessary, draws on new research to assess this potential. This study provides a strategic assessment of opportunities for maximizing the potential for electrical energy efficiency and renewable energy development by the Jicarilla Apache Nation. The report analyzes electricity use on the Jicarilla Apache Reservation in buildings. The report also assesses particular resources and technologies in detail, including energy efficiency, solar, wind, geothermal, biomass, and small hydropower. The closing sections set out the elements of a multi-year, multi-phase strategy for development of resources to the maximum benefit of the Nation.

  5. MRI imaging of fetal neck masses with airway compromise: utility in delivery planning

    International Nuclear Information System (INIS)

    Kathary, N.; Bulas, D.I.; Newman, K.D.; Schonberg, R.L.

    2001-01-01

    We present two cases of fetal neck masses that were initially diagnosed by ultrasound and further evaluated with prenatal MRI. MRI findings aided in further delineating the neck masses, increasing confidence in the final diagnosis (cervical teratoma and cystic hygroma). With the fetal airway typically filled with fluid that is of high signal on T2-weighted sequences, MRI images in three planes could identify whether the fetal larynx and trachea were partially or completely compressed by the neck tumor. This information was particularly useful in determining if a controlled delivery such as ex utero intrapartum treatment (EXIT) was necessary and aided the surgeons in planning their approach to establishing airway control in the delivery room. (orig.)

  6. Utility of the theory of planned behavior to predict nursing staff blood pressure monitoring behaviours.

    Science.gov (United States)

    Nelson, Joan M; Cook, Paul F; Ingram, Jennifer C

    2014-02-01

    To evaluate constructs from the theory of planned behavior (TPB, Ajzen 2002) - attitudes, sense of control, subjective norms and intentions - as predictors of accuracy in blood pressure monitoring. Despite numerous initiatives aimed at teaching blood pressure measurement techniques, many healthcare providers measure blood pressures incorrectly. Descriptive, cohort design. Medical assistants and licensed practical nurses were asked to complete a questionnaire on TPB variables. These nursing staff's patients had their blood pressures measured and completed a survey about techniques used to measure their blood pressure. We correlated nursing staff's responses on the TBP questionnaire with their intention to measure an accurate blood pressure and with the difference between their actual blood pressure measurement and a second measurement taken by a researcher immediately after the clinic visit. Patients' perceptions of MAs' and LPNs' blood pressure measurement techniques were examined descriptively. Perceived control and social norm predicted intention to measure an accurate blood pressure, with a negative relationship between knowledge and intention. Consistent with the TPB, intention was the only significant predictor of blood pressure measurement accuracy. Theory of planned behavior constructs predicted the healthcare providers' intention to measure blood pressure accurately and intention predicted the actual accuracy of systolic blood pressure measurement. However, participants' knowledge about blood pressure measurement had an unexpected negative relationship with their intentions. These findings have important implications for nursing education departments and organisations which traditionally invest significant time and effort in annual competency training focused on knowledge enhancement by staff. This study suggests that a better strategy might involve efforts to enhance providers' intention to change, particularly by changing social norms or increasing

  7. West Valley Demonstration Project facilities utilization plan for the existing facilities at the Western New York Nuclear Service Center

    International Nuclear Information System (INIS)

    Skillern, C.G.

    1986-05-01

    In 1980, Congress passed Public Law 96-368, the West Valley Demonstration Project (WVDP) Act. As a primary objective, the Act authorized the US Department of Energy (DOE) to solidify the high-level waste (HLW) stored at the Western New York Nuclear Service Center (WNYNSC) into a form suitable for transportation and disposal in a federal repository. This report will describe how WVDP proposes to use the existing WNYNSC Facilities in an efficient and technically effective manner to comply with Public Law 96-368. In support of the above cited law, the DOE has entered into a ''Cooperative agreement between the United States Department of Energy and the New York State Energy Research and Development Authority on the Western New York Nuclear Service Center at West Valley, New York.'' The state-owned areas turned over to the DOE for use are as follows: Process Plant, Waste Storage, Low-Level Waste Treatment Facility, Service Facilities, Plant Security, and Additional Facilities. The Facilities Utilization Plan (FUP) describes how the state-owned facilities will be utilized to complete the Project; it is divided into five sections as follows: Executive Summary - an overview; Introduction - the WVDP approach to utilizing the WNYNSC Facilities; WVDP Systems - a brief functional description of the system, list of equipment and components to be used and decontamination and decommissioning (D and D) support; WVDP Support Facilities; and Caveats that could effect or change the potential usage of a particular area

  8. State-of-the-art of the utilization of thermal effluents and its future R and D plannings

    International Nuclear Information System (INIS)

    Iituka, Teiji; Okano, Toshiaki; Wada, Akira

    1987-01-01

    Thermal and nuclear power plants have been constructed in coastal areas in Japan, and use large quantity of seawater for cooling condensers, consequently, they discharge warm drainage which is about 7 deg C higher than seawater. The object of this paper is to study on the method of expanding the use of warm drainage by collecting the knowledge on its actual use from the papers published so far. The number of the papers collected was 153. The main fields of actually using warm drainage are marine nurseries using seawater in Japan and greenhouse heating using fresh water in foreign countries. Seven nuclear power plants and 14 thermal power plants in Japan had the facilities of marine nurseries as of June, 1986. The quantity of warm drainage used was 0.667 m 3 -s (0.05 %) in nuclear power plants and 1.182 m 3 -h in thermal power plants. In Japan, most of warm drainage is the seawater only 7 deg C higher than the original seawater, therefore the application is limited. In order to expand the application, it is important to devise the system utilizing the energy of flow in addition to its heat. It was suggested that the expansion of application would be possible in the development and improvement of fishing grounds using large quantity of warm drainage. (Kako, I.)

  9. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  10. Health plan utilization and costs of specialty drugs within 4 chronic conditions.

    Science.gov (United States)

    Gleason, Patrick P; Alexander, G Caleb; Starner, Catherine I; Ritter, Stephen T; Van Houten, Holly K; Gunderson, Brent W; Shah, Nilay D

    2013-09-01

    Drugs are most typically defined as specialty because they are expensive; however, other criteria used to define a drug as specialty include biologic drugs, the need to inject or infuse the drug, the requirement for special handling, or drug availability only via a limited distribution network. Specialty drugs play an increasingly important role in the treatment of chronic conditions such as multiple sclerosis (MS), rheumatoid arthritis (RA), psoriasis, and inflammatory bowel disease (IBD), yet little is known regarding the comprehensive medical and pharmacy benefit utilization and cost trends for these conditions. To describe MS, RA, psoriasis, and IBD trends for condition prevalence, treatment with specialty drugs, specialty costs, nonspecialty costs, and total direct costs of care within the medical and pharmacy benefits. This was a descriptive analysis of a commercially insured population made up of 1 million members, using integrated medical and pharmacy administrative claims data from 2008 to 2010. Analyses were limited to continuously enrolled commercially insured individuals less than 65 years of age. Condition-specific cohorts for MS, RA, psoriasis, and IBD were defined using standardized criteria. Trends in condition prevalence, specialty drug use for the conditions, and direct total cost of care were analyzed. The direct costs were subcategorized into the following: medical benefit specialty drug costs, medical benefit all other costs, pharmacy benefit specialty drug costs, and pharmacy benefit all other costs. Trends and compound annual growth rates were calculated for the total cost of care and subcategory costs from 2008 through 2010. Condition prevalence ranged from a low of 1,720 per million members for MS to a high of 4,489 per million members for RA. Psoriasis and MS condition prevalence rates were unchanged over the 3 years; however, IBD prevalence increased 7.0%, and RA prevalence increased 9.7%. The rate of specialty drug use was lowest for IBD

  11. Clinical Utility of 4D FDG-PET/CT Scans in Radiation Treatment Planning

    Energy Technology Data Exchange (ETDEWEB)

    Aristophanous, Michalis, E-mail: maristophanous@lroc.harvard.edu [Department of Radiation Oncology, Dana-Farber/Brigham and Women' s Cancer Center and Harvard Medical School, Boston, MA (United States); Berbeco, Ross I.; Killoran, Joseph H. [Department of Radiation Oncology, Dana-Farber/Brigham and Women' s Cancer Center and Harvard Medical School, Boston, MA (United States); Yap, Jeffrey T. [Department of Radiology, Dana-Farber Cancer Institute and Harvard Medical School, Boston, MA (United States); Sher, David J.; Allen, Aaron M.; Larson, Elysia; Chen, Aileen B. [Department of Radiation Oncology, Dana-Farber/Brigham and Women' s Cancer Center and Harvard Medical School, Boston, MA (United States)

    2012-01-01

    Purpose: The potential role of four-dimensional (4D) positron emission tomography (PET)/computed tomography (CT) in radiation treatment planning, relative to standard three-dimensional (3D) PET/CT, was examined. Methods and Materials: Ten patients with non-small-cell lung cancer had sequential 3D and 4D [{sup 18}F]fluorodeoxyglucose PET/CT scans in the treatment position prior to radiation therapy. The gross tumor volume and involved lymph nodes were contoured on the PET scan by use of three different techniques: manual contouring by an experienced radiation oncologist using a predetermined protocol; a technique with a constant threshold of standardized uptake value (SUV) greater than 2.5; and an automatic segmentation technique. For each technique, the tumor volume was defined on the 3D scan (VOL3D) and on the 4D scan (VOL4D) by combining the volume defined on each of the five breathing phases individually. The range of tumor motion and the location of each lesion were also recorded, and their influence on the differences observed between VOL3D and VOL4D was investigated. Results: We identified and analyzed 22 distinct lesions, including 9 primary tumors and 13 mediastinal lymph nodes. Mean VOL4D was larger than mean VOL3D with all three techniques, and the difference was statistically significant (p < 0.01). The range of tumor motion and the location of the tumor affected the magnitude of the difference. For one case, all three tumor definition techniques identified volume of moderate uptake of approximately 1 mL in the hilar region on the 4D scan (SUV maximum, 3.3) but not on the 3D scan (SUV maximum, 2.3). Conclusions: In comparison to 3D PET, 4D PET may better define the full physiologic extent of moving tumors and improve radiation treatment planning for lung tumors. In addition, reduction of blurring from free-breathing images may reveal additional information regarding regional disease.

  12. NASA's Plans for Materials Science on ISS: Cooperative Utilization of the MSRR-MSL

    Science.gov (United States)

    Chiaramonte, Francis; Szofran, Frank

    2008-01-01

    The ISS Research Project draws Life (non-human) and Physical Sciences investigations on the ISS, free flyer and ground-based into one coordinated project. The project has two categories: I. Exploration Research Program: a) Utilizes the ISS as a low Technology Readiness Level (TRL) test bed for technology development, demonstration and problem resolution in the areas of life support, fire safety, power, propulsion, thermal management, materials technology, habitat design, etc.; b) Will include endorsement letters from other ETDP projects to show relevancy. II. Non-Exploration Research Program; a) Not directly related to supporting the human exploration program. Research conducted in the life (non-human) and physical sciences; b) The program will sustain, to the maximum extent practicable, the United States scientific expertise and research capability in fundamental microgravity research. Physical Sciences has about 44 grants, and Life Sciences has approximately 32 grants, mostly with universities, to conduct low TRL research; this includes grants to be awarded from the 2008 Fluid Physics and Life Science NRA's.

  13. Using Health Care Utilization and Publication Patterns to Characterize the Research Portfolio and to Plan Future Research Investments.

    Directory of Open Access Journals (Sweden)

    Luba Katz

    Full Text Available Government funders of biomedical research are under increasing pressure to demonstrate societal benefits of their investments. A number of published studies attempted to correlate research funding levels with the societal burden for various diseases, with mixed results. We examined whether research funded by the Department of Veterans Affairs (VA is well aligned with current and projected veterans' health needs. The organizational structure of the VA makes it a particularly suitable setting for examining these questions.We used the publication patterns and dollar expenditures of VA-funded researchers to characterize the VA research portfolio by disease. We used health care utilization data from the VA for the same diseases to define veterans' health needs. We then measured the level of correlation between the two and identified disease groups that were under- or over-represented in the research portfolio relative to disease expenditures. Finally, we used historic health care utilization trends combined with demographic projections to identify diseases and conditions that are increasing in costs and/or patient volume and consequently represent potential targets for future research investments.We found a significant correlation between research volume/expenditures and health utilization. Some disease groups were slightly under- or over-represented, but these deviations were relatively small. Diseases and conditions with the increasing utilization trend at the VA included hypertension, hypercholesterolemia, diabetes, hearing loss, sleeping disorders, complications of pregnancy, and several mental disorders.Research investments at the VA are well aligned with veteran health needs. The VA can continue to meet these needs by supporting research on the diseases and conditions with a growing number of patients, costs of care, or both. Our approach can be used by other funders of disease research to characterize their portfolios and to plan research

  14. Using Health Care Utilization and Publication Patterns to Characterize the Research Portfolio and to Plan Future Research Investments.

    Science.gov (United States)

    Katz, Luba; Fink, Rebecca V; Bozeman, Samuel R; McNeil, Barbara J

    2014-01-01

    Government funders of biomedical research are under increasing pressure to demonstrate societal benefits of their investments. A number of published studies attempted to correlate research funding levels with the societal burden for various diseases, with mixed results. We examined whether research funded by the Department of Veterans Affairs (VA) is well aligned with current and projected veterans' health needs. The organizational structure of the VA makes it a particularly suitable setting for examining these questions. We used the publication patterns and dollar expenditures of VA-funded researchers to characterize the VA research portfolio by disease. We used health care utilization data from the VA for the same diseases to define veterans' health needs. We then measured the level of correlation between the two and identified disease groups that were under- or over-represented in the research portfolio relative to disease expenditures. Finally, we used historic health care utilization trends combined with demographic projections to identify diseases and conditions that are increasing in costs and/or patient volume and consequently represent potential targets for future research investments. We found a significant correlation between research volume/expenditures and health utilization. Some disease groups were slightly under- or over-represented, but these deviations were relatively small. Diseases and conditions with the increasing utilization trend at the VA included hypertension, hypercholesterolemia, diabetes, hearing loss, sleeping disorders, complications of pregnancy, and several mental disorders. Research investments at the VA are well aligned with veteran health needs. The VA can continue to meet these needs by supporting research on the diseases and conditions with a growing number of patients, costs of care, or both. Our approach can be used by other funders of disease research to characterize their portfolios and to plan research investments.

  15. Utility of Preoperative CA125 Assay in the Management Planning of Women Diagnosed with Uterine Cancer

    Directory of Open Access Journals (Sweden)

    N. Povolotskaya

    2014-01-01

    Full Text Available Objective. This study assesses the role of preoperative serum CA125 levels in the planning treatment options for women diagnosed with uterine cancer. Material and Method. Ninety five consecutive patients diagnosed with uterine cancer during a four-year period were identified. Age ranged from 35 to 89 years with a mean age of 69 years. The preoperative CA125 levels were dichotomised at 28 U/mL (using ROC analysis to identify the best discriminating threshold for 5-year survival. This level was then correlated with preoperative prognostic indicators: patient age, tumour grade, and histopathological tumour cell type. Survival data was plotted using Kaplan-Meier curves and analysed using the log-rank test. Univariate and multivariate analysis were performed to identify the predictors of overall survival. Results. The mean age of patients was 69 years (range: 35–89. On univariate analysis, the use of preoperative CA125 levels of greater or less than 28 U/mL correlated significantly with age (P=0.01, the grade of disease (P=0.02 and unfavourable tissue type (P=0.03. This threshold CA125 level had a sensitivity of 75%, specificity of 76%, positive predictive value of 35% and negative predicative value of 96.25%, and a likelihood ratio of 3.12 for predicting nodal disease. Using a threshold of preoperative CA125 level of 28 U/mL (area under curve: 0.60 was also a significant predictor of 5-year survival (log-rank test, P=0.01. Using Cox multivariate survival analysis to identify predictive preoperative factors overall, unfavourable cell type was the strongest predictor of survival (Chi square = 36.5, df = 4, and P=0.001, followed by preoperative CA125 level (CA125 > 28 U/mL, P=0.011 and unfavourable preoperative grade (P=0.017. Amongst patients with a favourable histological tissue type (endometrioid, preoperative CA125 levels predicted overall survival (Chi square = 6.039, df = 2, P=0.02; however unfavourable preoperative

  16. Utility of the theories of reasoned action and planned behavior for predicting physician behavior: a prospective analysis.

    Science.gov (United States)

    Millstein, S G

    1996-09-01

    The utility of the theory of reasoned action (TRA) and the theory of planned behavior (TPB) for prospectively predicting physicians' delivery of preventive services was compared. Primary care physicians (N = 765) completed 2 mail surveys at periods 6 months apart. The addition of perceived behavioral control to the TRA model significantly increased the variance accounted for in behavioral intention and subsequent behavior (p behavioral control had direct effects on behavior and interacted with social norms and behavioral intentions. Applications of models such as the TRA or TPB have focused primarily on predicting the behavioral intentions and behaviors of patients. Results suggest that these models have relevance for studying the behavior of health care providers as well.

  17. An audit of imaging test utilization for the management of lymphoma in an oncology hospital: implications for resource planning?

    Science.gov (United States)

    Schwartz, A; Gospodarowicz, M K; Khalili, K; Pintilie, M; Goddard, S; Keller, A; Tsang, R W

    2006-02-01

    The purpose of this study was to assist with resource planning by examining the pattern of physician utilization of imaging procedures for lymphoma patients in a dedicated oncology hospital. The proportion of imaging tests ordered for routine follow up with no specific clinical indication was quantified, with specific attention to CT scans. A 3-month audit was performed. The reasons for ordering all imaging procedures (X-rays, CT scans, ultrasound, nuclear scan and MRI) were determined through a retrospective chart review. 411 lymphoma patients had 686 assessments (sets of imaging tests) and 981 procedures (individual imaging tests). Most procedures were CT scans (52%) and chest radiographs (30%). The most common reasons for ordering imaging were assessing response (23%), and investigating new symptoms (19%). Routine follow up constituted 21% of the assessments (142/686), and of these, 82% were chest radiographs (116/142), while 24% (34/142) were CT scans. With analysis restricted to CT scans (296 assessments in 248 patients), the most common reason for ordering CT scans were response evaluation (40%), and suspicion of recurrence and/or new symptom (23%). Follow-up CT scans done with no clinical indication comprised 8% (25/296) of all CT assessments. Staging CT scans were under-represented at 6% of all assessments. Imaging with CT scans for follow up of asymptomatic patients is infrequent. However, scans done for staging new lymphoma patients were unexpectedly low in frequency, due to scans done elsewhere prior to referral. This analysis uncovered utilization patterns, helped resource planning and provided data to reduce unnecessary imaging procedures.

  18. An Overview of Strategic Utilization Plan for the Moroccan Nuclear Research Reactor over the Period of 2010–2015

    International Nuclear Information System (INIS)

    Jibre, A.; Boufraqech, A.

    2013-01-01

    The National Centre for Nuclear Energy, Science and Technology (CNESTEN), a Moroccan state-owned company, is setting up a strategic utilization plan for its recently commissioned and licensed nuclear research reactor, Triga Mark II, 2 MW, over the period of 2010–2015. This strategic plan is aiming to efficiently and effectively meet existing and potential needs: research and development, education and training, and generally all related products and services, both at national and regional level, within a sustainable framework. For that purpose, CNESTEN’s vision is to develop and strengthen its position in the market place by fully integrating both operational and logistical issues in being strategically led, market oriented, competitively focused, operationally efficient, revenue generating applications emphasized, and human resources driven. In terms of existing and potential services and products to be delivered from the research reactor, CNESTEN is more focusing on education and training, for which an international training centre is under development; radioisotopes production, for both medical and industrial uses for which CNESTEN has a leading national position; analytical techniques such as NAA and PGNAA; neutron beam techniques such as neutron imaging and neutron diffraction; and irradiation services for NTD. (author)

  19. Multistage and multiobjective formulations of globally optimal upgradable expansions for electric power distribution systems

    Science.gov (United States)

    Vaziri Yazdi Pin, Mohammad

    Electric power distribution systems are the last high voltage link in the chain of production, transport, and delivery of the electric energy, the fundamental goals of which are to supply the users' demand safely, reliably, and economically. The number circuit miles traversed by distribution feeders in the form of visible overhead or imbedded underground lines, far exceed those of all other bulk transport circuitry in the transmission system. Development and expansion of the distribution systems, similar to other systems, is directly proportional to the growth in demand and requires careful planning. While growth of electric demand has recently slowed through efforts in the area of energy management, the need for a continued expansion seems inevitable for the near future. Distribution system and expansions are also independent of current issues facing both the suppliers and the consumers of electrical energy. For example, deregulation, as an attempt to promote competition by giving more choices to the consumers, while it will impact the suppliers' planning strategies, it cannot limit the demand growth or the system expansion in the global sense. Curiously, despite presence of technological advancements and a 40-year history of contributions in the area, many of the major utilities still relay on experience and resort to rudimentary techniques when planning expansions. A comprehensive literature review of the contributions and careful analyses of the proposed algorithms for distribution expansion, confirmed that the problem is a complex, multistage and multiobjective problem for which a practical solution remains to be developed. In this research, based on the 15-year experience of a utility engineer, the practical expansion problem has been clearly defined and the existing deficiencies in the previous work identified and analyzed. The expansion problem has been formulated as a multistage planning problem in line with a natural course of development and industry

  20. Effect of TV and radio family planning messages on the probability of modern contraception utilization in post-Soviet Central Asia.

    Science.gov (United States)

    Habibov, Nazim; Zainiddinov, Hakim

    2017-01-01

    This study evaluates the effects of family planning message broadcast on radio and TV on the probability of modern contraception utilization in post-Soviet Central Asia. Viewing family planning messages on TV improves the chances of using modern contraception for a woman who actually saw the messages by about 11 and 8 per cent in Kyrgyzstan and Tajikistan, respectively. If every woman in Kyrgyzstan and Tajikistan had an opportunity to watch a family planning message on TV, then the likelihood of using modern contraception would have improved by 10 and 7 per cent in Kyrgyzstan and Tajikistan, respectively. By contrast, the effect of hearing family planning messages on radio is not significant in both countries. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. Viewing family planning messages on TV improves the chances of using modern contraception for a woman who actually saw the messages by about 11 and 8 per cent in Kyrgyzstan and Tajikistan, respectively. If every woman in Kyrgyzstan and Tajikistan had an opportunity to watch a family planning message on TV, then the probability of using modern contraception would have improved by 10 and 7 per cent in Kyrgyzstan and Tajikistan, respectively. Consequently, using TV family planning messages in both countries should be encouraged. In comparison, the effect of hearing family planning messages on radio is not significant in both countries. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.

  1. Utility of learning plans in general practice vocational training: a mixed-methods national study of registrar, supervisor, and educator perspectives.

    Science.gov (United States)

    Garth, Belinda; Kirby, Catherine; Silberberg, Peter; Brown, James

    2016-08-19

    Learning plans are a compulsory component of the training and assessment requirements of general practice (GP) registrars in Australia. There is a small but growing number of studies reporting that learning plans are not well accepted or utilised in general practice training. There is a lack of research examining this apparent contradiction. The aim of this study was to examine use and perceived utility of formal learning plans in GP vocational training. This mixed-method Australian national research project utilised online learning plan usage data from 208 GP registrars and semi-structured focus groups and telephone interviews with 35 GP registrars, 12 recently fellowed GPs, 16 supervisors and 17 medical educators across three Regional Training Providers (RTPs). Qualitative data were analysed thematically using template analysis. Learning plans were used mostly as a log of activities rather than as a planning tool. Most learning needs were entered and ticked off as complete on the same day. Learning plans were perceived as having little value for registrars in their journey to becoming a competent GP, and as a bureaucratic hurdle serving as a distraction rather than an aid to learning. The process of learning planning was valued more so than the documentation of learning planning. This study provides creditable evidence that mandated learning plans are broadly considered by users to be a bureaucratic impediment with little value as a learning tool. It is more important to support registrars in planning their learning than to enforce documentation of this process in a learning plan. If learning planning is to be an assessed competence, methods of assessment other than the submission of a formal learning plan should be explored.

  2. Development of a comprehensive plan for utilization of digester gas moves towards energy self-sufficiency in Chicago, USA.

    Science.gov (United States)

    Kunetz, Thomas E; Fink-Finowicki, Jarek; McGowan, Steve; Auerbach, Eric

    2012-01-01

    The Metropolitan Water Reclamation District (MWRD) of Greater Chicago's Stickney Water Reclamation Plant (SWRP) anaerobically digests approximately 430 dry tons per day (dtpd) (390 dry metric tons per day) of solids and produces 3.4 million ft(3)/day (96 thousand m(3)/day) of biogas from the anaerobic digesters, making it one of the largest municipal digester gas complexes in the world. Installation of new treatment processes, as well as future increases in flows and loads to the plant, are expected to significantly increase production of biologically degradable sludge and biogas. This paper presents a comprehensive planning study that was completed to identify and evaluate alternatives for utilization of this biogas. The best, sustainable approach was identified, taking into consideration economics, social impacts, and environmental impacts. The model results indicate that the most economically favorable scenario involves installing a cogeneration facility to produce electricity on-site, and operating it in conjunction with the plant's existing boilers to satisfy the heating needs of the plant. This scenario also provides the greatest reduction in GHG offsets at the power plants.

  3. SU-E-J-70: Feasibility Study of Dynamic Arc and IMRT Treatment Plans Utilizing Vero Treatment Unit and IPlan Planning Computer for SRS/FSRT Brain Cancer Patients

    International Nuclear Information System (INIS)

    Huh, S; Lee, S; Dagan, R; Malyapa, R; Mendenhall, N; Mendenhall, W; Ho, M; Hough, D; Yam, M; Li, Z

    2014-01-01

    Purpose: To investigate the feasibility of utilizing Dynamic Arc (DA) and IMRT with 5mm MLC leaf of VERO treatment unit for SRS/FSRT brain cancer patients with non-invasive stereotactic treatments. The DA and IMRT plans using the VERO unit (BrainLab Inc, USA) are compared with cone-based planning and proton plans to evaluate their dosimetric advantages. Methods: The Vero treatment has unique features like no rotational or translational movements of the table during treatments, Dynamic Arc/IMRT, tracking of IR markers, limitation of Ring rotation. Accuracies of the image fusions using CBCT, orthogonal x-rays, and CT are evaluated less than ∼ 0.7mm with a custom-made target phantom with 18 hidden targets. 1mm margin is given to GTV to determine PTV for planning constraints considering all the uncertainties of planning computer and mechanical uncertainties of the treatment unit. Also, double-scattering proton plans with 6F to 9F beams and typical clinical parameters, multiple isocenter plans with 6 to 21 isocenters, and DA/IMRT plans are evaluated to investigate the dosimetric advantages of the DA/IMRT for complex shape of targets. Results: 3 Groups of the patients are divided: (1) Group A (complex target shape), CI's are same for IMRT, and DGI of the proton plan are better by 9.5% than that of the IMRT, (2) Group B, CI of the DA plans (1.91+/−0.4) are better than cone-based plan, while DGI of the DA plan is 4.60+/−1.1 is better than cone-based plan (5.32+/−1.4), (3) Group C (small spherical targets), CI of the DA and cone-based plans are almost the same. Conclusion: For small spherical targets, cone-based plans are superior to other 2 plans: DS proton and DA plans. For complex or irregular plans, dynamic and IMRT plans are comparable to cone-based and proton plans for complex targets

  4. Model of clinker capacity expansion

    CSIR Research Space (South Africa)

    Stylianides, T

    1998-10-01

    Full Text Available This paper describes a model which has been applied in practice to determine an optimal plan for clinker capacity expansion. The problem was formulated as an integer linear program aiming to determine the optimal number, size and location of kilns...

  5. Sustainable resource planning in energy markets

    International Nuclear Information System (INIS)

    Kamalinia, Saeed; Shahidehpour, Mohammad; Wu, Lei

    2014-01-01

    Highlights: • Sustainable resource planning with the consideration of expected transmission network expansion. • Incomplete information non-cooperative game-theoretic method for GEP. • Maximizing utility value whiling considering merits of having various generation portfolios. • Minimizing risk of investment using renewable generation options. • Application of the stochastic approach for evaluating the unpredictability of opponent payoffs and commodity values. - Abstract: This study investigates the role of sustainable energy volatility in a market participant’s competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCO’s expansion planning decision. The case studies illustrate the effectiveness of the proposed method

  6. Differences in utilization of dental procedures by children enrolled in Wisconsin Medicaid and Delta Dental insurance plans.

    Science.gov (United States)

    Bhagavatula, Pradeep; Xiang, Qun; Szabo, Aniko; Eichmiller, Fredrick; Okunseri, Christopher

    2017-12-01

    Few studies have directly compared dental procedures provided in public and private insurance plans for enrollees living in dental health professional shortage areas (DHPSAs). We examined the rates for the different types of dental procedures received by 0-18-year-old children living in DHPSAs and non-DHPSAs who were enrolled in Medicaid and those enrolled under Delta Dental of Wisconsin (DDW) for years 2002 to 2008. Medicaid and DDW dental claims data for 2002 to 2008 was analyzed. Enrollees were divided into DDW-DHPSA and non-DHPSA and Medicaid-DHPSA and non-DHPSA groups. Descriptive and multivariable analyses using over-dispersed Poisson regression were performed to examine the effect of living in DHPSAs and insurance type in relation to the number of procedures received. Approximately 49 and 65 percent of children living in non-DHPSAs that were enrolled in Medicaid and DDW received at least one preventive dental procedure annually, respectively. Children in DDW non-DHPSA group had 1.79 times as many preventive, 0.27 times fewer complex restorative and 0.51 times fewer endodontic procedures respectively, compared to those in Medicaid non-DHPSA group. Children enrolled in DDW-DHPSA group had 1.53 times as many preventive and 0.25 times fewer complex restorative procedures, compared to children in Medicaid-DHPSA group. DDW enrollees had significantly higher utilization rates for preventive procedures than children in Medicaid. There were significant differences across Medicaid and DDW between non-DHPSA and DHPSA for most dental procedures received by enrollees. © 2016 American Association of Public Health Dentistry.

  7. Timeliness of Operating Room Case Planning and Time Utilization: Influence of First and To-Follow Cases

    Directory of Open Access Journals (Sweden)

    Konrad Meissner

    2017-04-01

    Full Text Available Resource and cost constraints in hospitals demand thorough planning of operating room schedules. Ideally, exact start times and durations are known in advance for each case. However, aside from the first case’s start, most factors are hard to predict. While the role of the start of the first case for optimal room utilization has been shown before, data for to-follow cases are lacking. The present study therefore aimed to analyze all elective surgery cases of a university hospital within 1 year in search of visible patterns. A total of 14,014 cases scheduled on 254 regular working days at a university hospital between September 2015 and August 2016 underwent screening. After eliminating 112 emergencies during regular working hours, 13,547 elective daytime cases were analyzed, out of which 4,346 ranked first, 3,723 second, and 5,478 third or higher in the daily schedule. Also, 36% of cases changed start times from the day before to 7:00 a.m., with half of these (52% resulting in a delay of more than 15 min. After 7:00 a.m., 87% of cases started more than 10 min off schedule, with 26% being early and 74% late. Timeliness was 15 ± 72 min (mean ± SD for first, 21 ± 84 min for second, and 25 ± 93 min for all to-follow cases, compared to preoperative day planning, and 21 ± 45, 23 ± 61, and 19 ± 74 min compared to 7:00 a.m. status. Start time deviations were also related to procedure duration, with cases of 61–90 min duration being most reliable (deviation 9.8 ± 67 min compared to 7:00 a.m., regardless of order. In consequence, cases following after 61–90 min long cases had the shortest deviations of incision time from schedule (16 ± 66 min. Taken together, start times for elective surgery cases deviate substantially from schedule, with first and second cases falling into the highest mean deviation category. Second cases had the largest deviations from scheduled times compared to

  8. Multi types DG expansion dynamic planning in distribution system under stochastic conditions using Covariance Matrix Adaptation Evolutionary Strategy and Monte-Carlo simulation

    International Nuclear Information System (INIS)

    Sadeghi, Mahmood; Kalantar, Mohsen

    2014-01-01

    Highlights: • Defining a DG dynamic planning problem. • Applying a new evolutionary algorithm called “CMAES” in planning process. • Considering electricity price and fuel price variation stochastic conditions. • Scenario generation and reduction with MCS and backward reduction programs. • Considering approximately all of the costs of the distribution system. - Abstract: This paper presents a dynamic DG planning problem considering uncertainties related to the intermittent nature of the DG technologies such as wind turbines and solar units in addition to the stochastic economic conditions. The stochastic economic situation includes the uncertainties related to the fuel and electricity price of each year. The Monte Carlo simulation is used to generate the possible scenarios of uncertain situations and the produced scenarios are reduced through backward reduction program. The aim of this paper is to maximize the revenue of the distribution system through the benefit cost analysis alongside the encouraging and punishment functions. In order to close to reality, the different growth rates for the planning period are selected. In this paper the Covariance Matrix Adaptation Evolutionary Strategy is introduced and is used to find the best planning scheme of the DG units. The different DG types are considered in the planning problem. The main assumption of this paper is that the DISCO is the owner of the distribution system and the DG units. The proposed method is tested on a 9 bus test distribution system and the results are compared with the known genetic algorithm and PSO methods to show the applicability of the CMAES method in this problem

  9. Utilization of health care services in rural and urban areas: a determinant factor in planning and managing health care delivery systems.

    Science.gov (United States)

    Oladipo, Jimoh Ayanda

    2014-06-01

    Disparities in use of healthcare services between rural and urban areas have been empirically attributed to several factors. This study explores the existence of this disparity and its implication for planning and managing healthcare delivery systems. The objectives determine the relative importance of the various predisposing, enabling, need and health services factors on utilization of health services; similarity between rural and urban areas; and major explanatory variables for utilization. A four-stage model of service utilization was constructed with 31 variables under appropriate model components. Data is collected using cross-sectional sample survey of 1086 potential health services consumers in selected health facilities and resident milieu via questionnaire. Data is analyzed using factor analysis and cross tabulation. The 4-stage model is validated for the aggregate data and data for the rural areas with 3-stage model for urban areas. The order of importance of the factors is need, enabling, predisposing and health services. 11 variables are found to be powerful predictors of utilization. Planning of different categories of health care facilities in different locations should be based on utilization rates while proper management of established facilities should aim to improve health seeking behavior of people.

  10. Planning your first wind power project. A primer for utilities: Everything you need to know to bring your first wind power plant on-line

    International Nuclear Information System (INIS)

    Conover, K.; Davis, E.

    1994-12-01

    This primer has been prepared to help utility personnel become familiar with some or the details relative to wind power technology and project development. It is written as a series of relatively independent chapters to address specific topics or phases of wind power evaluation and development as they might occur within a utility. The topics include: wind prospecting and the first pass analysis, resource validation, project feasibility, resource planning and evaluation, resource acquisition, project development, equipment selection, project design and construction, and plant operation and maintenance

  11. Creating a bridge between data collection and program planning: a technical assistance model to maximize the use of HIV/AIDS surveillance and service utilization data for planning purposes.

    Science.gov (United States)

    Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R

    2005-12-01

    Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.

  12. Family planning utilization and factors associated among women receiving abortion services in health facilities of central zone towns of Tigray, Northern Ethiopia: a cross sectional Study.

    Science.gov (United States)

    Hagos, Goshu; Tura, Gurmesa; Kahsay, Gizienesh; Haile, Kebede; Grum, Teklit; Araya, Tsige

    2018-06-05

    Abortion remains among the leading causes of maternal death worldwide. Post-abortion contraception is significantly effective in preventing unintended pregnancy and abortion if provided before women leave the health facilty. However, the status of post-abortion family planning (PAFP) utilization and the contributing factors are not well studied in Tigray region. So, we conduct study aimed on family planning utilization and factors associated with it among women receiving abortion services. A facility based cross-sectional study design was conducted among women receiving abortion services in central zone of Tigray from December 2015to February 2016 using a total of 416 sample size. Women who came for abortion services were selected using systematic random sampling technique.. The data were collected using a pre-tested interviewer administered questionnair. Data were coded and entered in to Epi info 7 and then exported to SPSS for analysis. Descriptive statisticslike frequencies and mean were computed to display the results. Both Bivariable and multivariable logistic regression was used in the analysis. Variables statistically significant at p < 0.05 in the bivariable analysis were checked in multivariable logistic regration to identify independently associated factors. Then variables which were significantly associated with post abortion family planning utilization at p-value < 0.05 in the multivariable analysis were declared as significantly associated factors. A total of 409 abortion clients were interviewed in this study with 98.3% of response rate. Majority 290 (70.9%) of study participants utilized contracepives after abortion. Type of health facility, the decision maker on timing of having child, knowledge that pregnancy can happen soon after abortion and husband's opposition towards contraceptives were significantly associated with Post-abortion family planning ustilization. About one-third of abortion women failed to receive contraceptive before

  13. Low Thermal Expansion Glass Ceramics

    CERN Document Server

    Bach, Hans

    2005-01-01

    This book appears in the authoritative series reporting the international research and development activities conducted by the Schott group of companies. This series provides an overview of Schott's activities for scientists, engineers, and managers from all branches of industry worldwide in which glasses and glass ceramics are of interest. Each volume begins with a chapter providing a general idea of the current problems, results, and trends relating to the subjects treated. This new extended edition describes the fundamental principles, the manufacturing process, and applications of low thermal expansion glass ceramics. The composition, structure, and stability of polycrystalline materials having a low thermal expansion are described, and it is shown how low thermal expansion glass ceramics can be manufactured from appropriately chosen glass compositions. Examples illustrate the formation of this type of glass ceramic by utilizing normal production processes together with controlled crystallization. Thus g...

  14. Low thermal expansion glass ceramics

    CERN Document Server

    1995-01-01

    This book is one of a series reporting on international research and development activities conducted by the Schott group of companies With the series, Schott aims to provide an overview of its activities for scientists, engineers, and managers from all branches of industry worldwide where glasses and glass ceramics are of interest Each volume begins with a chapter providing a general idea of the current problems, results, and trends relating to the subjects treated This volume describes the fundamental principles, the manufacturing process, and applications of low thermal expansion glass ceramics The composition, structure, and stability of polycrystalline materials having a low thermal expansion are described, and it is shown how low thermal expansion glass ceramics can be manufactured from appropriately chosen glass compositions Examples illustrate the formation of this type of glass ceramic by utilizing normal production processes together with controlled crystallization Thus glass ceramics with thermal c...

  15. ASSESSING TAXPAYER BEHAVIOR IN UTILIZING E-FILLING TAX SYSTEM WITH THE PERSPECTIVE OF TECHNOLOGY ACCEPTANCE MODEL AND THE THEORY OF PLANNED BEHAVIOR

    Directory of Open Access Journals (Sweden)

    Maharani H.

    2017-07-01

    Full Text Available This study aims to assess the factors which influence taxpayer behavior in utilizing e-filling tax system. This study combines Technology Acceptance Model and the Theory of Planned Behavior. The data was collected through a survey method. It took 100 respondents of the personal taxpayers of the Pratama Gresik Utara tax office's employee in utilizing the e-filing to submit their tax return. In order to assess the data, the researchers used Partial Least Square statistical method. The finding shows that the intention construct has a positive influence over the e-filling utilization behavior. Behavioral control has a positive influence over the behavior through the e-filing utilization intention. Easy of use, purpose, attitude, subjective norm, and behavioral control have a positive influence over the e-filing utilization intention. Credibility has a negative influence over the e-filing utilization intention. This study involved the Application Service Provider, Directorate General of Taxes, and KPP Pratama which have to more pay attention the behavior, intention, easy of use, purpose, attitude, subjective norm, and behavioral control of the taxpayer.

  16. Land use/land cover and land capability data for evaluating land utilization and official land use planning in Indramayu Regency, West Java, Indonesia

    Science.gov (United States)

    Ambarwulan, W.; Widiatmaka; Nahib, I.

    2018-05-01

    Land utilization in Indonesia is regulated in an official spatial land use planning (OSLUP), stipulated by government regulations. However in fact, land utilizations are often develops inconsistent with regulations. OSLUP itself is also not usually compatible with sustainable land utilizations. This study aims to evaluate current land utilizations and OSLUP in Indramayu Regency, West Java. The methodology used is the integrated analysis using land use and land cover (LU/LC) data, land capability data and spatial pattern in OSLUP. Actual LU/LC are interpreted using SPOT-6 imagery of 2014. The spatial data of land capabilities are derived from land capability classification using field data and laboratory analysis. The confrontation between these spatial data is interpreted in terms of future direction for sustainable land use planning. The results shows that Indramayu regency consists of 8 types of LU/LC. Land capability in research area range from class II to VIII. Only a small portion of the land in Indramayu has been used in accordance with land capability, but most of the land is used exceeding its land capability.

  17. Streamlining and integrating right-of-way and utility processes with planning, environmental, and design processes in Australia and Canada.

    Science.gov (United States)

    2009-06-01

    Many transportation projects require acquisition of land and accommodation of utility facilities in the : right-of-way. The Federal Highway Administration, American Association of State Highway and : Transportation Officials, and National Cooperative...

  18. ETV/ESTCP Demonstration Plan - Demonstration and Verification of a Turbine Power Generation System Utilizing Renewable Fuel: Landfill Gas

    Science.gov (United States)

    This Test and Quality Assurance Plan (TQAP) provides data quality objections for the success factors that were validated during this demonstration include energy production, emissions and emission reductions compared to alternative systems, economics, and operability, including r...

  19. Building regulations, planning of building constructions and housing development areas taking into account the utilization of solar energy

    Energy Technology Data Exchange (ETDEWEB)

    Bierhals, R; Schaefer, G; Weigert, D

    1977-01-01

    Complete systems for utilizing solar energy both for hot water preparation and for space heating are available in the FRG today. However, solar technology is unlikely to prevail without governmental support since the plants are still too expensive although there is a principal positive attitude towards solar energy. More knowledge of the process of solar energy utilization is necessary both in the field of building laws, and for building enterprises, architects and planners, if this new form of energy is to succeed.

  20. Scenario-informed multiple criteria analysis for prioritizing investments in electricity capacity expansion

    International Nuclear Information System (INIS)

    Martinez, Lauro J.; Lambert, James H.; Karvetski, Christopher W.

    2011-01-01

    Planning the expansion and energy security of electricity capacity for a national electricity utility is a complex task in almost any economy. Planning is usually an iterative activity and can involve the use of large scale planning optimization systems accompanied by assessment of uncertain scenarios emerging from economic, technological, environmental, and regulatory developments. This paper applies a multiple criteria decision analysis to prioritize investment portfolios in capacity expansion and energy security while principally studying the robustness of the prioritization to multiple uncertain and emergent scenarios. The scenarios are identified through interaction with decision makers and stakeholders. The approach finds which scenarios most affect the prioritization of the portfolios and which portfolios have the greatest upside and downside potential across scenarios. The approach fosters innovation in the use of robust and efficient technologies, renewable energy sources, and cleaner energy fuels. A demonstration is provided for assessing the performance of technology portfolios constructed from investments in nine electricity generation technologies in Mexico.

  1. Guidelines and workbook for assessment of organization and administration of utilities seeking operating license for a nuclear power plant. Guidelines for utility organization and administration plan. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    Thurber, J.A.; Olson, J.; Osborn, R.N.; Sommers, P.; Widrig, R.D.

    1986-09-01

    Volumes 1 and 2 of this report are a partial response to the requirements of Item I.B.1.1 of the ''NRC Action Plan Developed as a Result of the TMI-2 Accident,'' NUREG-0660, and are designed to serve as a basis for replacing the earlier NUREG-0731, ''Guidelines for Utility Management Structure and Technical Resources.'' These Guidelines are intended to provide guidance to the user in preparing a written plan for a proposed nuclear organization and administration. The purpose of the Workbook (Vol. 2) is to guide the NRC reviewer through a systematic review and assessment of a proposed organization and administration. It is the NRC's intention to incorporate these Guidelines and Workbook into a future revision of the Standard Review Plan (SRP), NUREG-0800. However, at this time the report is being published so that the material may be used on a voluntary basis by industry to systematically prepare or evaluate their organization or administration plans. Use of the report by the NRC would not occur until after it has been incorpoarted in the SRP

  2. Rapid replacement of bridge deck expansion joints study - phase I.

    Science.gov (United States)

    2014-12-01

    Bridge deck expansion joints are used to allow for movement of the bridge deck due to thermal expansion, dynamics loading, and : other factors. More recently, expansion joints have also been utilized to prevent the passage of winter de-icing chemical...

  3. Fission gas retention and axial expansion of irradiated metallic fuel

    International Nuclear Information System (INIS)

    Fenske, G.R.; Emerson, J.E.; Savoie, F.E.; Johanson, E.W.

    1986-05-01

    Out-of-reactor experiments utilizing direct electrical heating and infrared heating techniques were performed on irradiated metallic fuel. The results indicate accelerated expansion can occur during thermal transients and that the accelerated expansion is driven by retained fission gases. The results also demonstrate gas retention and, hence, expansion behavior is a function of axial position within the pin

  4. The Ten-Year 2007-2016 Plan of Power Expansion in the context of the recovering of Brazilian electric sector planning: advances and possible enhancements; O Plano Decenal de Expansao de Energia 2007/2016 no contexto da retomada do planejamento do setor eletrico brasileiro: avancos e possiveis aprimoramentos

    Energy Technology Data Exchange (ETDEWEB)

    Buratini, Ricardo [Universidade Estadual de Campinas (IE/UNICAMP), SP (Brazil). Inst. de Economia

    2008-07-01

    The purpose of this paper is to analyze the methodology for power consumption projection presented in the Ten-year (2007-2016) Plan of Power Expansion (PDEE 2007/2016) and to propose some questions for discussion. Indeed, bearing in mind the progress achieved in the recent past with respect to the resumption of long term planning in the Brazilian electric power sector, it is pertinent to promote a discussion about the possible limitations of the expansion methodology proposed in PDEE. In short, it is believed that, starting from such a discussion, it could be possible to contribute towards the aim of making the planning process of the Brazilian electric power sector expansion more transparent, more consistent and more participative, consequently bringing a greater convergence of the expectations of the agents of the sector. The main questions raised in this paper about the PDEE's methodology are with respect to the absence of sufficient detail about the interactive adjustment of the several models used to project the consumption, as well as to the lack of information about the models themselves. The general conclusion of this paper is that, in order that the PDEE meets its objective of providing correct signals to all the agents, it is necessary to include more incisively the sector's specialists and the private agents in the methodological discussions, so that no important doubts will remain about the various projections. In our understanding, the success of such an enterprise will depend not only on the disposition of the agents, but on the greater detail and depth that should be previously given to the questions raised in this paper. It is certainly a significant challenge, of a high complexity but of an even higher importance to the electric power sector and to the Brazilian economy. (author)

  5. Wind energy planning in Denmark

    International Nuclear Information System (INIS)

    Godtfredsen, F.; Lemming, J.; Nielsen, S.R.; Jessien, S.

    1992-01-01

    The total capacity of the about 3300 Danish wind turbines is approximately 450 MW. Most of the wind turbines have been erected detached or in small clusters by private citizens - especially by joint ownership. 100 MW of the capacity have been installed by the power companies, mainly in wind farms. Up till now the privately owned wind turbines have been erected without a previous planning process. Increased expansion of wind energy makes demands on physical planning, since access to suitable locations in Denmark is limited. Hence more coordination is called for between the interested parties to ensure optimal utilization of the sites allocated by the physical planning authorities. A siting committee appointed by the Government has recommended locations for additional 100 MW power company wind farms as well as a more detailed planning in each local community. The detailed planning in the municipality of Thisted is described. (au)

  6. Utility of Megavoltage Fan-Beam CT for Treatment Planning in a Head-And-Neck Cancer Patient with Extensive Dental Fillings Undergoing Helical Tomotherapy

    International Nuclear Information System (INIS)

    Yang, Claus; Liu Tianxiao; Jennelle, Richard L.; Ryu, Janice K.; Vijayakumar, Srinivasan; Purdy, James A.; Chen, Allen M.

    2010-01-01

    The purpose of this study was to demonstrate the potential utility of megavoltage fan-beam computed tomography (MV-FBCT) for treatment planning in a patient undergoing helical tomotherapy for nasopharyngeal carcinoma in the presence of extensive dental artifact. A 28-year-old female with locally advanced nasopharyngeal carcinoma presented for radiation therapy. Due to the extensiveness of the dental artifact present in the oral cavity kV-CT scan acquired at simulation, which made treatment planning impossible on tomotherapy planning system, MV-FBCT imaging was obtained using the HI-ART tomotherapy treatment machine, with the patient in the treatment position, and this information was registered with her original kV-CT scan for the purposes of structure delineation, dose calculation, and treatment planning. To validate the feasibility of the MV-FBCT-generated treatment plan, an electron density CT phantom (model 465, Gammex Inc., Middleton, WI) was scanned using MV-FBCT to obtain CT number to density table. Additionally, both a 'cheese' phantom (which came with the tomotherapy treatment machine) with 2 inserted ion chambers and a generic phantom called Quasar phantom (Modus Medical Devices Inc., London, ON, Canada) with one inserted chamber were used to confirm dosimetric accuracy. The MV-FBCT could be used to clearly visualize anatomy in the region of the dental artifact and provide sufficient soft-tissue contrast to assist in the delineation of normal tissue structures and fat planes. With the elimination of the dental artifact, the MV-FBCT images allowed more accurate dose calculation by the tomotherapy system. It was confirmed that the phantom material density was determined correctly by the tomotherapy MV-FBCT number to density table. The ion chamber measurements agreed with the calculations from the MV-FBCT generated phantom plan within 2%. MV-FBCT may be useful in radiation treatment planning for nasopharyngeal cancer patients in the setting of extensive

  7. The Traditional Birth Attendant in Maternal and Child Health and Family Planning: A Guide to Her Training and Utilization.

    Science.gov (United States)

    Verderese, Maria de Lourdes; Turnbull, Lily M.

    The publication provides guidelines for assisting developing countries in determining strategies for the utilization and training of traditional birth attendants (TBAs). TBA's are persons (usually women in rural areas) who assist the mother at childbirth and who initially acquired their skills through experience rather than formal training. After…

  8. Utility of Intelligence Tests for Treatment Planning, Classification, and Placement Decisions: Recent Empirical Findings and Future Directions.

    Science.gov (United States)

    Gresham, Frank M.; Witt, Joseph C.

    1997-01-01

    Maintains that intelligence tests contribute little to the planning, implementation, and evaluation of instructional interventions for children. Suggests that intelligence tests are not useful in making differential diagnostic and classification determinations for children with mild learning problems and that such testing is not a cost-beneficial…

  9. Case Study: Does training of private networks of Family Planning clinicians in urban Pakistan affect service utilization?

    Science.gov (United States)

    2010-01-01

    Background To determine whether training of providers participating in franchise clinic networks is associated with increased Family Planning service use among low-income urban families in Pakistan. Methods The study uses 2001 survey data consisting of interviews with 1113 clinical and non-clinical providers working in public and private hospitals/clinics. Data analysis excludes non-clinical providers reducing sample size to 822. Variables for the analysis are divided into client volume, and training in family planning. Regression models are used to compute the association between training and service use in franchise versus private non-franchise clinics. Results In franchise clinic networks, staff are 6.5 times more likely to receive family planning training (P = 0.00) relative to private non-franchises. Service use was significantly associated with training (P = 0.00), franchise affiliation (P = 0.01), providers' years of family planning experience (P = 0.02) and the number of trained staff working at government owned clinics (P = 0.00). In this setting, nurses are significantly less likely to receive training compared to doctors (P = 0.00). Conclusions These findings suggest that franchises recruit and train various cadres of health workers and training maybe associated with increased service use through improvement in quality of services. PMID:21062460

  10. Case Study: Does training of private networks of Family Planning clinicians in urban Pakistan affect service utilization?

    Directory of Open Access Journals (Sweden)

    Qureshi Asma M

    2010-11-01

    Full Text Available Abstract Background To determine whether training of providers participating in franchise clinic networks is associated with increased Family Planning service use among low-income urban families in Pakistan. Methods The study uses 2001 survey data consisting of interviews with 1113 clinical and non-clinical providers working in public and private hospitals/clinics. Data analysis excludes non-clinical providers reducing sample size to 822. Variables for the analysis are divided into client volume, and training in family planning. Regression models are used to compute the association between training and service use in franchise versus private non-franchise clinics. Results In franchise clinic networks, staff are 6.5 times more likely to receive family planning training (P = 0.00 relative to private non-franchises. Service use was significantly associated with training (P = 0.00, franchise affiliation (P = 0.01, providers' years of family planning experience (P = 0.02 and the number of trained staff working at government owned clinics (P = 0.00. In this setting, nurses are significantly less likely to receive training compared to doctors (P = 0.00. Conclusions These findings suggest that franchises recruit and train various cadres of health workers and training maybe associated with increased service use through improvement in quality of services.

  11. Case Study: Does training of private networks of Family Planning clinicians in urban Pakistan affect service utilization?

    Science.gov (United States)

    Qureshi, Asma M

    2010-11-09

    To determine whether training of providers participating in franchise clinic networks is associated with increased Family Planning service use among low-income urban families in Pakistan. The study uses 2001 survey data consisting of interviews with 1113 clinical and non-clinical providers working in public and private hospitals/clinics. Data analysis excludes non-clinical providers reducing sample size to 822. Variables for the analysis are divided into client volume, and training in family planning. Regression models are used to compute the association between training and service use in franchise versus private non-franchise clinics. In franchise clinic networks, staff are 6.5 times more likely to receive family planning training (P = 0.00) relative to private non-franchises. Service use was significantly associated with training (P = 0.00), franchise affiliation (P = 0.01), providers' years of family planning experience (P = 0.02) and the number of trained staff working at government owned clinics (P = 0.00). In this setting, nurses are significantly less likely to receive training compared to doctors (P = 0.00). These findings suggest that franchises recruit and train various cadres of health workers and training maybe associated with increased service use through improvement in quality of services.

  12. The Bambuí Health and Aging Study (BHAS: private health plan and medical care utilization by older adults

    Directory of Open Access Journals (Sweden)

    Lima-Costa Maria Fernanda F.

    2002-01-01

    Full Text Available The aim of this cross sectional study was to investigate whether holding a private health plan affects the consumption of medical services (hospitalization and visits to a doctor and use of medications by older adults. All residents in Bambuí town (Minas Gerais, Brazil aged > or = 60 years (n = 1,742 were selected. From these, 92.2% were interviewed and 85.9% were examined (blood tests and physical measurements. After adjustments for counfounders, those under exclusive public coverage (n = 1,296, compared with those holding a private health plan (n = 310, presented some evidence of having worse health status, reported less visits to a doctor, and used a small number of prescribed medications. The main explanation for the aged holding a private health plan was economic, not health. Even though those who had only public health coverage complained more in relation to medical care (70.9%, an important proportion of the aged with a private health care plan presented some kind of complaint (45.2%. Another worrying factor was the difficulty to acquire medication because of financial problems (47.2 and 25.2% reported, respectively. Further investigations are needed to verify whether our results can be generalized to other communities of the country.

  13. The cost of uncertainty in capacity expansion problems

    Energy Technology Data Exchange (ETDEWEB)

    Jenhung Wang [National Chung Cheng Univ., Dept. of Business Administration, Chia-Yi (Taiwan); Sparrow, F.T. [Purdue Univ., School of Industrial Engineering, West Lafayette, IN (United States)

    1999-07-01

    The goals of this paper are to present a two-stage programming model of the capacity expansion problem under uncertainty of demand and explore the impact of the uncertainty on cost. The model is a mixed integer nonlinear programming (MINLP) model with the consideration of uncertainty used to maximise the expected presented value of utility profits over the planning horizon, under the constraints of rate of return and reserve margin regulation. The results reveal that the uncertainty harms the profit seriously. In this paper both microeconomics and mathematical programming are used to analyse the problem. We try to observe the economic behaviour of the utility with uncertainty involved. We also investigate the influence on the cost of uncertainty of each economic parameter. (Author)

  14. National plan of eviction? The figure of public utility and infrastructure Sector as a means to dispossession

    Directory of Open Access Journals (Sweden)

    Alberto Castillo

    2016-05-01

    Full Text Available The figure of public utility, which has constitutional status, it is extremely important for the realization of projects of national and strategic interest, because it is what allows the expropriation of property rights over land that are necessary to develop such projects. The current government and the previous ones are aware of this, so have long been promoting the use of this figure of light and unlimited to favor big business interests that are behind these businesses and not citizenship.

  15. Risk management for drinking water safety in low and middle income countries - cultural influences on water safety plan (WSP) implementation in urban water utilities.

    Science.gov (United States)

    Omar, Yahya Y; Parker, Alison; Smith, Jennifer A; Pollard, Simon J T

    2017-01-15

    We investigated cultural influences on the implementation of water safety plans (WSPs) using case studies from WSP pilots in India, Uganda and Jamaica. A comprehensive thematic analysis of semi-structured interviews (n=150 utility customers, n=32 WSP 'implementers' and n=9 WSP 'promoters'), field observations and related documents revealed 12 cultural themes, offered as 'enabling', 'limiting', or 'neutral', that influence WSP implementation in urban water utilities to varying extents. Aspects such as a 'deliver first, safety later' mind set; supply system knowledge management and storage practices; and non-compliance are deemed influential. Emergent themes of cultural influence (ET1 to ET12) are discussed by reference to the risk management, development studies and institutional culture literatures; by reference to their positive, negative or neutral influence on WSP implementation. The results have implications for the utility endorsement of WSPs, for the impact of organisational cultures on WSP implementation; for the scale-up of pilot studies; and they support repeated calls from practitioner communities for cultural attentiveness during WSP design. Findings on organisational cultures mirror those from utilities in higher income nations implementing WSPs - leadership, advocacy among promoters and customers (not just implementers) and purposeful knowledge management are critical to WSP success. Copyright © 2016 The Authors. Published by Elsevier B.V. All rights reserved.

  16. 21st Century Power Partnership Fellowship Program: Supporting Next-generation Planning Modeling Practices at South Africa's Power Utility Eskom

    Energy Technology Data Exchange (ETDEWEB)

    Zinaman, Owen

    2016-10-01

    This presentation details the 21st Century Power Partnership's fellowship program accomplishments from 2016. This fellowship brought two fellows from South Africa's power utility, Eskom, to the U.S. Department of Energy's National Renewable Energy Laboratory. The fellows spent two weeks working to improve the fidelity of Eskom's PLEXOS long-term and short-term models, which are used in long-term generation planning exercises and capacity adequacy assessments. The fellows returned to Eksom equipped with a new suite of tools and skills to enhance Eksom's PLEXOS modeling capabilities.

  17. Utility of Normal Tissue-to-Tumor {alpha}/{beta} Ratio When Evaluating Isodoses of Isoeffective Radiation Therapy Treatment Plans

    Energy Technology Data Exchange (ETDEWEB)

    Gay, Hiram A., E-mail: hgay@radonc.wustl.edu [Department of Radiation Oncology, Washington University School of Medicine, St. Louis, Missouri (United States); Jin Jianyue [Department of Radiation Oncology, Henry Ford Hospital, Detroit, Michigan (United States); Chang, Albert J. [Department of Radiation Oncology, University of California, San Francisco, California (United States); Ten Haken, Randall K. [Department of Radiation Oncology, University of Michigan, Ann Arbor, Michigan (United States)

    2013-01-01

    Purpose: To achieve a better understanding of the effect of the number of fractions on normal tissue sparing for equivalent tumor control in radiation therapy plans by using equivalent biologically effective dose (BED) isoeffect calculations. Methods and Materials: The simple linear quadratic (LQ) model was assumed to be valid up to 10 Gy per fraction. Using the model, we formulated a well-known mathematical equality for the tumor prescription dose and probed and solved a second mathematical problem for normal tissue isoeffect. That is, for a given arbitrary relative isodose distribution (treatment plan in percentages), 2 isoeffective tumor treatment regimens (N fractions of the dose D and n fractions of the dose d) were denoted, which resulted in the same BED (corresponding to 100% prescription isodose). Given these situations, the LQ model was further exploited to mathematically establish a unique relative isodose level, z (%), for the same arbitrary treatment plan, where the BED to normal tissues was also isoeffective for both fractionation regimens. Results: For the previously stated problem, the relative isodose level z (%), where the BEDs to the normal tissue were also equal, was defined by the normal tissue {alpha}/{beta} ratio divided by the tumor {alpha}/{beta} times 100%. Fewer fractions offers a therapeutic advantage for those portions of the normal tissue located outside the isodose surface, z, whereas more fractions offer a therapeutic advantage for those portions of the normal tissue within the isodose surface, z. Conclusions: Relative isodose-based treatment plan evaluations may be useful for comparing isoeffective tumor regimens in terms of normal tissue effects. Regions of tissues that would benefit from hypofractionation or standard fractionation can be identified.

  18. Case Study: Does training of private networks of Family Planning clinicians in urban Pakistan affect service utilization?

    OpenAIRE

    Qureshi, Asma M

    2010-01-01

    Abstract Background To determine whether training of providers participating in franchise clinic networks is associated with increased Family Planning service use among low-income urban families in Pakistan. Methods The study uses 2001 survey data consisting of interviews with 1113 clinical and non-clinical providers working in public and private hospitals/clinics. Data analysis excludes non-clinical providers reducing sample size to 822. Variables for the analysis are divided into client vol...

  19. Negative thermal expansion materials

    International Nuclear Information System (INIS)

    Evans, J.S.O.

    1997-01-01

    The recent discovery of negative thermal expansion over an unprecedented temperature range in ZrW 2 O 8 (which contracts continuously on warming from below 2 K to above 1000 K) has stimulated considerable interest in this unusual phenomenon. Negative and low thermal expansion materials have a number of important potential uses in ceramic, optical and electronic applications. We have now found negative thermal expansion in a large new family of materials with the general formula A 2 (MO 4 ) 3 . Chemical substitution dramatically influences the thermal expansion properties of these materials allowing the production of ceramics with negative, positive or zero coefficients of thermal expansion, with the potential to control other important materials properties such as refractive index and dielectric constant. The mechanism of negative thermal expansion and the phase transitions exhibited by this important new class of low-expansion materials will be discussed. (orig.)

  20. Inter-utility trade review

    International Nuclear Information System (INIS)

    Warnes, E.M.; Vaahedi, E.

    1991-01-01

    The National Energy Board was requested by the Minister of Energy, Mines and Resources to identify possible measures to improve cooperation among Canadian electrical utilities and to enhance access for buyers and sellers of electricity to available transmission capacity through intervening systems for wheeling purposes. To identify measures to improve cooperation, a questionnaire was sent to electric utilities and other interested parties on the present extent and future possibilities for inter-utility cooperation. The questionnaire and its results are presented. It was found that there already exists a significant amount of inter-utility cooperation in Canada. Such cooperation generally involves interchanges of economy energy, non-economic capacity and energy, coordinated operation, resource sharing, maintenance scheduling, emergency supports, etc. There is a very limited degree of integrated generation expansion planning. Typically, these agreements are carried out under interconnection agreements negotiated on a bi-lateral basis. The highest current degree of cooperation exists under the auspices of the Alberta interconnected power system pool. Wheeling is limited and generally restricted to cases where the sender and receiver are the same entity or where power is wheeled to a utility purchasing it from the wheeler's system. 2 figs., 3 tabs

  1. Department of Energy plan for recovery and utilization of nuclear byproducts from defense wastes. Volume 1. Executive summary

    International Nuclear Information System (INIS)

    1983-08-01

    Nuclear byproducts are a major national resource that has yet to be incorporated into the economy. The current Defense Byproducts Program is designed to match specific military and commercial needs with the availability of valuable products which are currently treated as waste at considerable expense in waste management costs. This program plan focuses on a few specific areas with the greatest potential for near-term development and application. It also recognizes the need for a continuing effort to develop new applications for byproducts and to continue to assess the impacts on waste management. The entire program has been, and will continue to be structured so as to ensure the safety of the public and maintain the purity of the environment. Social and institutional concerns have been recognized and will be handled appropriately. A significant effort will be undertaken to inform the public of the benefits of byproduct use and of the care being taken to ensure safe, efficient operation

  2. Department of Energy plan for recovery and utilization of nuclear byproducts from defense wastes. Volume 1. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-08-01

    Nuclear byproducts are a major national resource that has yet to be incorporated into the economy. The current Defense Byproducts Program is designed to match specific military and commercial needs with the availability of valuable products which are currently treated as waste at considerable expense in waste management costs. This program plan focuses on a few specific areas with the greatest potential for near-term development and application. It also recognizes the need for a continuing effort to develop new applications for byproducts and to continue to assess the impacts on waste management. The entire program has been, and will continue to be structured so as to ensure the safety of the public and maintain the purity of the environment. Social and institutional concerns have been recognized and will be handled appropriately. A significant effort will be undertaken to inform the public of the benefits of byproduct use and of the care being taken to ensure safe, efficient operation.

  3. An Assessment Model for Energy Efficiency Program Planning in Electric Utilities: Case of the Pacific of Northwest U.S.A

    Science.gov (United States)

    Iskin, Ibrahim

    Energy efficiency stands out with its potential to address a number of challenges that today's electric utilities face, including increasing and changing electricity demand, shrinking operating capacity, and decreasing system reliability and flexibility. Being the least cost and least risky alternative, the share of energy efficiency programs in utilities' energy portfolios has been on the rise since the 1980s, and their increasing importance is expected to continue in the future. Despite holding great promise, the ability to determine and invest in only the most promising program alternatives plays a key role in the successful use of energy efficiency as a utility-wide resource. This issue becomes even more significant considering the availability of a vast number of potential energy efficiency programs, the rapidly changing business environment, and the existence of multiple stakeholders. This dissertation introduces hierarchical decision modeling as the framework for energy efficiency program planning in electric utilities. The model focuses on the assessment of emerging energy efficiency programs and proposes to bridge the gap between technology screening and cost/benefit evaluation practices. This approach is expected to identify emerging technology alternatives which have the highest potential to pass cost/benefit ratio testing procedures and contribute to the effectiveness of decision practices in energy efficiency program planning. The model also incorporates rank order analysis and sensitivity analysis for testing the robustness of results from different stakeholder perspectives and future uncertainties in an attempt to enable more informed decision-making practices. The model was applied to the case of 13 high priority emerging energy efficiency program alternatives identified in the Pacific Northwest, U.S.A. The results of this study reveal that energy savings potential is the most important program management consideration in selecting emerging energy

  4. Expansion joints for LMFBR

    Energy Technology Data Exchange (ETDEWEB)

    Dzenus, M.; Hundhausen, W.; Jansing, W.

    1979-10-15

    This discourse recounts efforts put into the SNR-2 project; specifically the development of compensation devices. The various prototypes of these compensation devices are described and the state of development reviewed. The expansion joints were developed on the basis of specific design criteria whereby differentiation is made between expansion joints of small and large nominal diameter. Expansion joints for installation in the sodium-filled primary piping are equipped with safety bellows in addition to the actual working bellows.

  5. Integrated transportation scenario planning.

    Science.gov (United States)

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  6. South African uranium industry plans for expansion

    International Nuclear Information System (INIS)

    James, H.E.; Boydell, D.W.; Simonsen, H.A.

    1978-01-01

    Resources and production of uranium in South Africa are discussed. The cost of mining and extraction from gold ores is considered. An outline is presented of the extraction and recovery of uranium and of new developments in sorting, milling, and preconcentration. (U.K.)

  7. Five-year examination of utilization and drug cost outcomes associated with benefit design changes including reference pricing for proton pump inhibitors in a state employee health plan.

    Science.gov (United States)

    Johnson, Jill T; Neill, Kathryn K; Davis, Dwight A

    2011-04-01

    The Arkansas State Employee Benefits Division (EBD) is a self-insured program comprising public school and other state employees, their spouses, and dependents. Previous research published in JMCP (2006) showed drug cost savings of $2.20 per member per month (PMPM; 37.6%) or annualized savings of $3.4 million associated with a benefit design change and coverage of the proton pump inhibitor (PPI) omeprazole over-the-counter (OTC) beginning in March 2004. On May 1, 2005, brand esomeprazole was excluded from coverage, with current users grandfathered for 4 months until September 2005. Reference pricing for PPIs, including esomeprazole but excluding generic omeprazole, was implemented on September 1, 2005, and the beneficiary cost share for all PPIs except generic omeprazole was determined from comparison of the PPI actual price to the $0.90 omeprazole OTC reference price per unit. To examine PPI utilization and drug costs before and after (a) excluding esomeprazole from coverage (with grandfathering current users) and (b) implementing a therapeutic maximum allowable cost (TMAC), or reference-pricing benefit design, for the PPI class in a large state employee health plan with fairly stable enrollment of approximately 127,500 members in 2005 through 2008 and approximately 128,000 members in 2009 Q1. The pharmacy claims database for the EBD was used to examine utilization and cost data for PPIs in a longitudinal analysis for the 61-month period from March 1, 2004, through March 31, 2009. Pharmacy claims data were compared for the period 14 months prior to esomeprazole exclusion (preperiod), 4 months during the esomeprazole exclusion (postperiod 1), and the ensuing 43 months of PPI reference pricing (postperiod 2). PPI cost and utilization data for the intervention group of approximately 127,500 beneficiaries were compared with a group of 122 self-insured employers with a total of nearly 1 million beneficiaries whose pharmacy benefits did not include reference pricing for

  8. Fundamental plan of atomic energy development and utilization in fiscal year 1986 related to atomic energy safety

    International Nuclear Information System (INIS)

    1986-01-01

    The Nuclear Safety Commission decided to report to the Prime Minister after having determined this matter by assuming the passage of the budget draft for fiscal year 1986 as the prerequisite. As the fundamental policy, in order to cope with the advance of atomic energy development and utilization, such as the promotion of nuclear power generation and the construction of a prototype FBR, a demonstration ATR, a reprocessing plant and other nuclear fuel cycle facilities, it is required to perfect the measures for ensuring the safety of atomic energy. For this purpose, the perfecting of the function of Nuclear Safety Commission and the system for safety examination, inspection and operation management and supervision in Government organs, the improvement of the quality of operators, the safety regulation of radioactive waste treatment and disposal, and the perfecting of the laws related to the regulation of nuclear raw materials, nuclear fuel and nuclear reacters are carried out. The research on the engineering safety of LWRs, the reactors of new types and reprocessing facilities, the research on the prevention of radiation injuries and the research on the safety of radioactive wastes are advanced. The establishment of nuclear fuel cycle, and the research on reactor decommissioning, the development of new type reactors and nuclear fusion are promoted from the viewpoint of safety. (Kako, I.)

  9. Utility of the theory of reasoned action and theory of planned behavior for predicting Chinese adolescent smoking.

    Science.gov (United States)

    Guo, Qian; Johnson, C Anderson; Unger, Jennifer B; Lee, Liming; Xie, Bin; Chou, Chih-Ping; Palmer, Paula H; Sun, Ping; Gallaher, Peggy; Pentz, MaryAnn

    2007-05-01

    One third of smokers worldwide live in China. Identifying predictors of smoking is important for prevention program development. This study explored whether the Theory of Reasoned Action (TRA) and Theory of Planned Behavior (TPB) predict adolescent smoking in China. Data were obtained from 14,434 middle and high school students (48.6% boys, 51.4% girls) in seven geographically varied cities in China. TRA and TPB were tested by multilevel mediation modeling, and compared by multilevel analyses and likelihood ratio tests. Perceived behavioral control was tested as a main effect in TPB and a moderation effect in TRA. The mediation effects of smoking intention were supported in both models (p<0.001). TPB accounted for significantly more variance than TRA (p<0.001). Perceived behavioral control significantly interacted with attitudes and social norms in TRA (p<0.001). Therefore, TRA and TPB are applicable to China to predict adolescent smoking. TPB is superior to TRA for the prediction and TRA can better predict smoking among students with lower than higher perceived behavioral control.

  10. Estimation of soil erosion for a sustainable land use planning: RUSLE model validation by remote sensing data utilization in the Kalikonto watershed

    Directory of Open Access Journals (Sweden)

    C. Andriyanto

    2015-10-01

    Full Text Available Technology of Geographic Information Systems (GIS and Remote Sensing (RS are increasingly used for planning and natural resources management. GIS and RS is based on pixels is used as a tool of spatial modeling for predicting the erosion. One of the methods developed for predicting the erosion is a Revised Universal Soil Loss Equation (RUSLE. RUSLE is the method used for predicting the erosion associated with runoff gained from five parameters, namely: rain erosivity (R, soil erodibility (K, length of slopes (L, slope (S, and land management (CP. The main constraint encountered in the process of operating the GIS is the calculation of the slope length factor (L.This study was designed to create a plan of sustainable land use and low erosion through the RULSE erosion modeling by utilizing the remote sensing data. With this approach, this study was divided into three activities, namely (1 the preparation and analysis of spatial data for the determination of the parameters and estimating the erosion by using RUSLE models, (2 the validation and calibration of the model of RUSLE by measuring soil erosion at the scale of plots on the field, and (3 Creating a plan of sustainable land use and low erosion with RUSLE. The validation erosion shows the value of R2 = 0.56 and r = 0.74. Results of this study showed that the RUSLE model could be used in the Kalikonto watershed. The erosions at the value of the actual estimation, spatial Plan (RTRW and land capability class in the Kalikonto watershed were 72t / ha / year, 62 t / ha / year and 58 t / ha / year, respectively.

  11. Uses and updating of the Benders method in the integer-mixed programming in the planning of the electric power systems expansion; Usos y actualizacion del metodo de Benders en la programacion entera-mixta y en la planeacion de la expansion de los sistemas electricos de potencia

    Energy Technology Data Exchange (ETDEWEB)

    De la Torre Vega, Eli

    1997-04-01

    In the first chapter the deduction of the Benders cuts are presented, departing from the properties of duality. Also the properties of the Benders cuts are presented, as well as the initial algorithm of Benders to solve any problem of lineal integer-mixed programming are presented. In the second chapter, of the planning of the expansion of means of generation and transmission in an electric power system is presented and the different structures of the mathematical programming it gives rise to and how the method of Benders can be adapted to these. In the third chapter the theoretical contributions of this work are presented: a) How to initialize the master problem to take advantage of the acquired experience after having solved a similar problem, so that it can be solved more efficiently, the succession of integer-mixed problems of linear programming that arise when solving the problem of the planning of the expansion of generation and transmission means in an electric power system. b) How to generate a master problem whose continuous optimal solution corresponds to the optimal continuous one of the integer-mixed problem, so that the search of integer solutions is made in the vicinity of the optimum continuous. c) How to generate an integer solution, close to the optimum continuous of the integer-mixed problem, that has high probability of being feasible, and that is perhaps the optimal integer solution, in a smaller time than that required to solve it in exact form. In addition, other ideas are presented that can be incorporated to the Benders method. In order to show the effectiveness of the proposed ideas, in chapter 4 the results obtained when solving several problems are presented using: 1. The updated Benders method, 2. The branch and bound method, 3. The update of Benders when adding restrictions and 4. The update of Benders when considered as integer each time to more variables. Finally a summary is made of the achievements, of the conclusions obtained and

  12. Formerly Utilized MED/AEC Sites Remedial Action Program. Project management plan for the decontamination of Jones Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, K.F.; Smith, W.H.; Wynveen, R.A.

    1984-01-01

    The Department of Energy (DOE) has in place a plan for the decontamination and decommissioning of contaminated sites that had been formerly utilized by the Manhattan Engineering District (MED) and/or the Atomic Energy Commission. This plan is referred to as the Formerly Utilized Sites Remedial Action Program (FUSRAP). Among these sites are Jones Laboratory, Ryerson Physical Laboratory and Eckhart Hall of The University of Chicago at Chicago, Illinois. This document represents the Project Management Plan for the decontamination of these facilities. 13 references, 3 figures, 1 table.

  13. Formerly Utilized MED/AEC Sites Remedial Action Program. Project management plan for the decontamination of Jones Laboratory, Ryerson Physical Laboratory, and Eckhart Hall, the University of Chicago, Chicago, Illinois

    International Nuclear Information System (INIS)

    Flynn, K.F.; Smith, W.H.; Wynveen, R.A.

    1984-01-01

    The Department of Energy (DOE) has in place a plan for the decontamination and decommissioning of contaminated sites that had been formerly utilized by the Manhattan Engineering District (MED) and/or the Atomic Energy Commission. This plan is referred to as the Formerly Utilized Sites Remedial Action Program (FUSRAP). Among these sites are Jones Laboratory, Ryerson Physical Laboratory and Eckhart Hall of The University of Chicago at Chicago, Illinois. This document represents the Project Management Plan for the decontamination of these facilities. 13 references, 3 figures, 1 table

  14. A bi-level integrated generation-transmission planning model incorporating the impacts of demand response by operation simulation

    International Nuclear Information System (INIS)

    Zhang, Ning; Hu, Zhaoguang; Springer, Cecilia; Li, Yanning; Shen, Bo

    2016-01-01

    Highlights: • We put forward a novel bi-level integrated power system planning model. • Generation expansion planning and transmission expansion planning are combined. • The effects of two sorts of demand response in reducing peak load are considered. • Operation simulation is conducted to reflect the actual effects of demand response. • The interactions between the two levels can guarantee a reasonably optimal result. - Abstract: If all the resources in power supply side, transmission part, and power demand side are considered together, the optimal expansion scheme from the perspective of the whole system can be achieved. In this paper, generation expansion planning and transmission expansion planning are combined into one model. Moreover, the effects of demand response in reducing peak load are taken into account in the planning model, which can cut back the generation expansion capacity and transmission expansion capacity. Existing approaches to considering demand response for planning tend to overestimate the impacts of demand response on peak load reduction. These approaches usually focus on power reduction at the moment of peak load without considering the situations in which load demand at another moment may unexpectedly become the new peak load due to demand response. These situations are analyzed in this paper. Accordingly, a novel approach to incorporating demand response in a planning model is proposed. A modified unit commitment model with demand response is utilized. The planning model is thereby a bi-level model with interactions between generation-transmission expansion planning and operation simulation to reflect the actual effects of demand response and find the reasonably optimal planning result.

  15. Convergence of mayer expansions

    International Nuclear Information System (INIS)

    Brydges, D.C.

    1986-01-01

    The tree graph bound of Battle and Federbush is extended and used to provide a simple criterion for the convergence of (iterated) Mayer expansions. As an application estimates on the radius of convergence of the Mayer expansion for the two-dimensional Yukawa gas (nonstable interaction) are obtained

  16. Understanding young and older male drivers' willingness to drive while intoxicated: the predictive utility of constructs specified by the theory of planned behaviour and the prototype willingness model.

    Science.gov (United States)

    Rivis, Amanda; Abraham, Charles; Snook, Sarah

    2011-05-01

    The present study examined the predictive utility of constructs specified by the theory of planned behaviour (TPB) and prototype willingness model (PWM) for young and older male drivers' willingness to drive while intoxicated. A cross-sectional questionnaire was employed. Two hundred male drivers, recruited via a street survey, voluntarily completed measures of attitude, subjective norm, perceived behavioural control, prototype perceptions, and willingness. Findings showed that the TPB and PWM variables explained 65% of the variance in young male drivers' willingness and 47% of the variance in older male drivers' willingness, with the interaction between prototype favourability and similarity contributing 7% to the variance explained in older males' willingness to drive while intoxicated. The findings possess implications for theory, research, and anti-drink driving campaigns. ©2010 The British Psychological Society.

  17. Spatial Linkage and Urban Expansion: AN Urban Agglomeration View

    Science.gov (United States)

    Jiao, L. M.; Tang, X.; Liu, X. P.

    2017-09-01

    Urban expansion displays different characteristics in each period. From the perspective of the urban agglomeration, studying the spatial and temporal characteristics of urban expansion plays an important role in understanding the complex relationship between urban expansion and network structure of urban agglomeration. We analyze urban expansion in the Yangtze River Delta Urban Agglomeration (YRD) through accessibility to and spatial interaction intensity from core cities as well as accessibility of road network. Results show that: (1) Correlation between urban expansion intensity and spatial indicators such as location and space syntax variables is remarkable and positive, while it decreases after rapid expansion. (2) Urban expansion velocity displays a positive correlation with spatial indicators mentioned above in the first (1980-1990) and second (1990-2000) period. However, it exhibits a negative relationship in the third period (2000-2010), i.e., cities located in the periphery of urban agglomeration developing more quickly. Consequently, the hypothesis of convergence of urban expansion in rapid expansion stage is put forward. (3) Results of Zipf's law and Gibrat's law show urban expansion in YRD displays a convergent trend in rapid expansion stage, small and medium-sized cities growing faster. This study shows that spatial linkage plays an important but evolving role in urban expansion within the urban agglomeration. In addition, it serves as a reference to the planning of Yangtze River Delta Urban Agglomeration and regulation of urban expansion of other urban agglomerations.

  18. Chemical graph-theoretic cluster expansions

    International Nuclear Information System (INIS)

    Klein, D.J.

    1986-01-01

    A general computationally amenable chemico-graph-theoretic cluster expansion method is suggested as a paradigm for incorporation of chemical structure concepts in a systematic manner. The cluster expansion approach is presented in a formalism general enough to cover a variety of empirical, semiempirical, and even ab initio applications. Formally such approaches for the utilization of chemical structure-related concepts may be viewed as discrete analogues of Taylor series expansions. The efficacy of the chemical structure concepts then is simply bound up in the rate of convergence of the cluster expansions. In many empirical applications, e.g., boiling points, chromatographic separation coefficients, and biological activities, this rate of convergence has been observed to be quite rapid. More note will be made here of quantum chemical applications. Relations to questions concerning size extensivity of energies and size consistency of wave functions are addressed

  19. Analytic continuation and perturbative expansions in QCD

    Czech Academy of Sciences Publication Activity Database

    Caprini, I.; Fischer, Jan

    2002-01-01

    Roč. 24, - (2002), s. 127-135 ISSN 1434-6044 R&D Projects: GA MPO RP-4210/69 Institutional research plan: CEZ:AV0Z1010920 Keywords : perturbative expansion * quantum chromodynamics * infrared ambiguity * essential singularities Subject RIV: BF - Elementary Particles and High Energy Physics Impact factor: 6.162, year: 2002

  20. Annual plan, December 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This annual plan is being provided as required under Section 'D' of the Alberta Energy and Utilities Board Information Letter IL 90-8. The objective is to provide the Board, NOVA Gas Transmission (NGTL) customers and other interested parties with a comprehensive overview of NOVA Gas Transmission's pipeline system expansion plans for the gas year 2000/ 2001, and the winter season of the 2001/2002 gas year. The plan includes descriptions of NGTL's design assumptions and criteria, as well as long term outlook for field deliverability, productive capability, gas deliveries, proposed facility additions, capital expenditures, revenue requirements and firm service demand rates. Major factors affecting the facility requirements for the period under consideration are a decrease in the maximum day delivery volume at the Empress border point, an increase in intra-Alberta maximum day delivery volumes and associated decline in productive capability. Chapter One of the Plan describes the the Annual Plan process itself; Chapter Two is devoted to a discussion of facilities design methodology; Chapter Three deals with economic assumptions; Chapter Four describes design flow, while Chapters Five and Six outline the mainline , meter stations, laterals, and lateral loops facility requirements. Chapter Seven provides and overview of the capital and financial forecasts. tabs., figs.

  1. Effect of a therapeutic maximum allowable cost (MAC) program on the cost and utilization of proton pump inhibitors in an employer-sponsored drug plan in Canada.

    Science.gov (United States)

    Mabasa, Vincent H; Ma, Johnny

    2006-06-01

    Therapeutic maximum allowable cost (MAC) is a managed care intervention that uses reference pricing in a therapeutic class or category of drugs or an indication (e.g., heartburn). Therapeutic MAC has not been studied in Canada or the United States. The proton pump inhibitor (PPI) rabeprazole was used as the reference drug in this therapeutic MAC program based on prices for PPIs in the province of Ontario. No PPI is available over the counter in Canada. To evaluate the utilization and anticipated drug cost savings for PPIs in an employer-sponsored drug plan in Canada that implemented a therapeutic MAC program for PPIs. An employer group with an average of 6,300 covered members, which adopted the MAC program for PPIs in June 2003, was compared with a comparison group comprising the book of business throughout Canada (approximately 5 million lives) without a PPI MAC program (non-MAC group). Pharmacy claims for PPIs were identified using the first 6 characters of the generic product identifier (GPI 492700) for a 36-month period from June 1, 2002, through May 31, 2005. The primary comparison was the year prior to the intervention (from June 1, 2002, through May 31, 2003) and the first full year following the intervention (June 1, 2004, through May 31, 2005). Drug utilization was evaluated by comparing the market share of each of the PPIs for the 2 time periods and by the days of PPI therapy per patient per year (PPPY) and days of therapy per prescription (Rx). Drug cost was defined as the cost of the drug (ingredient cost), including allowable provincial pharmacy markup but excluding pharmacy dispense fee. Cost savings were calculated from the allowed drug cost per claim, allowed cost per day, and allowed cost PPPY. (All amounts are in Canadian dollars.) The MAC intervention group experienced an 11.7% reduction in the average cost per day of PPI drug therapy, from 2.14 US dollars in the preperiod to 1.89 US dollars in the postperiod, compared with a 3.7% reduction in

  2. Controlled Thermal Expansion Alloys

    Data.gov (United States)

    National Aeronautics and Space Administration — There has always been a need for controlled thermal expansion alloys suitable for mounting optics and detectors in spacecraft applications.  These alloys help...

  3. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  4. Fuel Thermal Expansion (FTHEXP)

    International Nuclear Information System (INIS)

    Reymann, G.A.

    1978-07-01

    A model is presented which deals with dimensional changes in LWR fuel pellets caused by changes in temperature. It is capable of dealing with any combination of UO 2 and PuO 2 in solid, liquid or mixed phase states, and includes expansion due to the solid-liquid phase change. The function FTHEXP models fuel thermal expansion as a function of temperature, fraction of PuO 2 , and the fraction of fuel which is molten

  5. The feasibility of utilizing pseudo CT-data for online MRI based treatment plan adaptation for a stereotactic radiotherapy treatment of spinal bone metastases

    International Nuclear Information System (INIS)

    Hoogcarspel, Stan J; Van der Velden, Joanne M; Lagendijk, Jan J W; Van Vulpen, Marco; Raaymakers, Bas W

    2014-01-01

    The purpose of this study was to investigate what pseudo-CT (pCT) strategy is sufficient for online MRI based treatment plan adaptation of a stereotactic treatment for spinal bone metastases. For this purpose, the dosimetric accuracy of five increasingly complex pCT strategies was evaluated using the planning CT data of 20 patients suffering from spinal metastases. For each pCT, a treatment plan was developed and simulated on both the pCT and the original CT data of the patient. The two resulting dose distributions were compared using gamma analysis of 2%/2 mm. In this paper, a Gamma Pass Rate (GPR) of ⩾95% within the Target Volume (TV) was considered clinically acceptable. We additionally demonstrated in this paper the automatic generation of each investigated pCT strategy with the use of dedicated MRI data complemented with pre-treatment CT data of a patient in treatment position. The dosimetric accuracy of a pCT increases when additional bulk densities are utilized for a pCT. However, the dosimetric accuracy of even the most complex ‘bulk density’ pCT strategy used in this study had an average GPR of only 78% within the TV. However, if information on the heterogeneous electron density distribution within the affected vertebral body was available, a clinically acceptable 99% mean GPR was observed. All pCTs could successfully be generated using the MRI data in combination with the CT data of a patient in treatment position. The results presented in this study show that a simple ‘bulk density’ pseudo-CT strategy is not feasible for online MRI based treatment plan adaptation for spinal bone metastases. However, a clinically acceptable result is generated if the information on the heterogeneous electron density (ED) distribution within the affected vertebral bone is available. Therefore, any pCT strategy for this tumor site should include a method which can estimate the heterogeneous ED of the affected vertebral bone. (paper)

  6. Forces in wingwalls from thermal expansion of skewed semi-integral bridges : executive summary report.

    Science.gov (United States)

    2010-11-01

    Bridges that utilize expansion joints have an overall higher maintenance cost due to leakage at the expansion joint leading to deterioration of the joint, as well as structural components beneath the joint including the superstructure and substructur...

  7. Surgical Splint Design Influences Transverse Expansion in Segmental Maxillary Osteotomies

    DEFF Research Database (Denmark)

    Stokbro, Kasper; Aagaard, Esben; Torkov, Peter

    2017-01-01

    splint designs on achieving the planned transverse expansion in bimaxillary surgery with segmental maxillary procedures. Materials and Methods: Forty-two participants were included in a retrospective observational study. All participants had completed virtually planned bimaxillary surgery with 3-piece......Purpose: In segmental maxillary procedures, it is imperative to obtain as much of the planned expansion as possible. Lack of obtained expansion, in addition to late relapse after splint removal, can result in relapse of the posterior crossbite. This study investigated the influence of 2 surgical...... maxillary segmentation. The primary outcome variable was the transverse expansion obtained, measured as the expansion between the maxillary first molars on preoperative and postoperative cone-beam computed tomograms. The postoperative scan was performed 1 week after surgery with the splint still in place...

  8. Path Planning with a Lazy Significant Edge Algorithm (LSEA

    Directory of Open Access Journals (Sweden)

    Joseph Polden

    2013-04-01

    Full Text Available Probabilistic methods have been proven to be effective for robotic path planning in a geometrically complex environment. In this paper, we propose a novel approach, which utilizes a specialized roadmap expansion phase, to improve lazy probabilistic path planning. This expansion phase analyses roadmap connectivity information to bias sampling towards objects in the workspace that have not yet been navigated by the robot. A new method to reduce the number of samples required to navigate narrow passages is also proposed and tested. Experimental results show that the new algorithm is more efficient than the traditional path planning methodologies. It was able to generate solutions for a variety of path planning problems faster, using fewer samples to arrive at a valid solution.

  9. ‘Overall Regional Planning, Whole Advancement, and Terminal Offer’is the Fundamental Outset for Prohibition of Burning Straw in Field and Total Utilization of Straws in China

    Directory of Open Access Journals (Sweden)

    CHANG Zhi-zhou

    2015-08-01

    Full Text Available Straw burning is a serious problem, which draws high attention from the whole society. In this study, the issues of management, policy and techniques regarding to the straw burning and its integrated utilization were analyzed. Based on the analysis results, a novel strategy, i.e., overall regional planning, village basis, combination of collection and returning, policy guidance and market operation, was raised to inhibit straw burning and enhance the efficiency of straw utilization. In technology, the methods of regional control, balance of harvest and return, effective collection, improving application, creative mechanism were emphasized. In addition, the effect of total utilization replying on the method of overall regional planning and whole advancement was presented on the village-scale. The application results in Chemen Township, Sihong County, Jiangsu Province showed that the goal of total utilization of straws and prohibition of burning in the regional scale could be achieved according to the novel strategy.

  10. 34 CFR 361.35 - Innovation and expansion activities.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Innovation and expansion activities. 361.35 Section 361... Innovation and expansion activities. (a) The State plan must assure that the State will reserve and use a...) To support the funding of— (i) The State Rehabilitation Council, if the State has a Council...

  11. Resonant state expansions

    International Nuclear Information System (INIS)

    Lind, P.

    1993-02-01

    The completeness properties of the discrete set of bound state, virtual states and resonances characterizing the system of a single nonrelativistic particle moving in a central cutoff potential is investigated. From a completeness relation in terms of these discrete states and complex scattering states one can derive several Resonant State Expansions (RSE). It is interesting to obtain purely discrete expansion which, if valid, would significantly simplify the treatment of the continuum. Such expansions can be derived using Mittag-Leffler (ML) theory for a cutoff potential and it would be nice to see if one can obtain the same expansions starting from an eigenfunction theory that is not restricted to a finite sphere. The RSE of Greens functions is especially important, e.g. in the continuum RPA (CRPA) method of treating giant resonances in nuclear physics. The convergence of RSE is studied in simple cases using square well wavefunctions in order to achieve high numerical accuracy. Several expansions can be derived from each other by using the theory of analytic functions and one can the see how to obtain a natural discretization of the continuum. Since the resonance wavefunctions are oscillating with an exponentially increasing amplitude, and therefore have to be interpreted through some regularization procedure, every statement made about quantities involving such states is checked by numerical calculations.Realistic nuclear wavefunctions, generated by a Wood-Saxon potential, are used to test also the usefulness of RSE in a realistic nuclear calculation. There are some fundamental differences between different symmetries of the integral contour that defines the continuum in RSE. One kind of symmetry is necessary to have an expansion of the unity operator that is idempotent. Another symmetry must be used if we want purely discrete expansions. These are found to be of the same form as given by ML. (29 refs.)

  12. Thermal expansion behavior in fabricated cellular structures

    International Nuclear Information System (INIS)

    Oruganti, R.K.; Ghosh, A.K.; Mazumder, J.

    2004-01-01

    Thermal expansion behavior of cellular structures is of interest in applications where undesirable deformation and failure are caused by thermal expansion mismatch. This report describes the role of processing-induced effects and metallurgical aspects of melt-processed cellular structures, such as a bi-material structure designed to contract on heating, as well as uni-material structures of regular and stochastic topology. This bi-material structure utilized the principle of internal geometric constraints to alter the expansion behavior of the internal ligaments to create overall contraction of the structure. Homogenization design method was used to design the structure, and fabrication was by direct metal deposition by laser melting of powder in another part of a joint effort. The degree of porosity and grain size in the fabricated structure are characterized and related to the laser deposition parameters. The structure was found to contract upon heating over a short range of temperature subsequent to which normal expansion ensued. Also examined in this report are uni-material cellular structures, in which internal constraints arise from residual stress variations caused by the fabrication process, and thereby alter their expansion characteristics. A simple analysis of thermal strain of this material supports the observed thermal expansion behavior

  13. Expansion joints for LMFBR

    International Nuclear Information System (INIS)

    Dzenus, M.; Hundhausen, W.; Jansing, W.

    1980-01-01

    This discourse recounts efforts put into the SNR-2 project; specifically the development of compensation devices. The various prototypes of these compensation devices are described and the state of the development reviewed. Large Na (sodium)-heat transfer systems require a lot of valuable space if the component lay-out does not include compensation devices. So, in order to condense the spatial requirement as much as possible, expansion joints must be integrated into the pipe system. There are two basic types to suit the purpose: axial expansion joints and angular expansion joints. The expansion joints were developed on the basis of specific design criteria whereby differentiation is made between expansion joints of small and large nominal diameter. Expansion joints for installation in the sodium-filled primary piping are equipped with safety bellows in addition to the actual working bellows. Expansion joints must be designed and mounted in a manner to completely withstand seismic forces. The design must exclude any damage to the bellows during intermittent operations, that is, when sodium is drained the bellows' folds must be completely empty; otherwise residual solidified sodium could destroy the bellows when restarting. The expansion joints must be engineered on the basis of the following design data for the secondary system of the SNR project: working pressure: 16 bar; failure mode pressure: 5 events; failure mode: 5 sec., 28.5 bar, 520 deg. C; working temperature: 520 deg. C; temperature transients: 30 deg. C/sec.; service life: 200,000 h; number of load cycles: 10 4 ; material: 1.4948 or 1.4919; layer thickness of folds: 0.5 mm; angular deflection (DN 800): +3 deg. C or; axial expansion absorption (DN 600): ±80 mm; calculation: ASME class. The bellows' development work is not handled within this scope. The bellows are supplied by leading manufacturers, and warrant highest quality. Multiple bellows were selected on the basis of maximum elasticity - a property

  14. Accelerating the loop expansion

    International Nuclear Information System (INIS)

    Ingermanson, R.

    1986-01-01

    This thesis introduces a new non-perturbative technique into quantum field theory. To illustrate the method, I analyze the much-studied phi 4 theory in two dimensions. As a prelude, I first show that the Hartree approximation is easy to obtain from the calculation of the one-loop effective potential by a simple modification of the propagator that does not affect the perturbative renormalization procedure. A further modification then susggests itself, which has the same nice property, and which automatically yields a convex effective potential. I then show that both of these modifications extend naturally to higher orders in the derivative expansion of the effective action and to higher orders in the loop-expansion. The net effect is to re-sum the perturbation series for the effective action as a systematic ''accelerated'' non-perturbative expansion. Each term in the accelerated expansion corresponds to an infinite number of terms in the original series. Each term can be computed explicitly, albeit numerically. Many numerical graphs of the various approximations to the first two terms in the derivative expansion are given. I discuss the reliability of the results and the problem of spontaneous symmetry-breaking, as well as some potential applications to more interesting field theories. 40 refs

  15. Virial Expansion Bounds

    Science.gov (United States)

    Tate, Stephen James

    2013-10-01

    In the 1960s, the technique of using cluster expansion bounds in order to achieve bounds on the virial expansion was developed by Lebowitz and Penrose (J. Math. Phys. 5:841, 1964) and Ruelle (Statistical Mechanics: Rigorous Results. Benjamin, Elmsford, 1969). This technique is generalised to more recent cluster expansion bounds by Poghosyan and Ueltschi (J. Math. Phys. 50:053509, 2009), which are related to the work of Procacci (J. Stat. Phys. 129:171, 2007) and the tree-graph identity, detailed by Brydges (Phénomènes Critiques, Systèmes Aléatoires, Théories de Jauge. Les Houches 1984, pp. 129-183, 1986). The bounds achieved by Lebowitz and Penrose can also be sharpened by doing the actual optimisation and achieving expressions in terms of the Lambert W-function. The different bound from the cluster expansion shows some improvements for bounds on the convergence of the virial expansion in the case of positive potentials, which are allowed to have a hard core.

  16. Conformal expansions and renormalons

    Energy Technology Data Exchange (ETDEWEB)

    Rathsman, J.

    2000-02-07

    The coefficients in perturbative expansions in gauge theories are factorially increasing, predominantly due to renormalons. This type of factorial increase is not expected in conformal theories. In QCD conformal relations between observables can be defined in the presence of a perturbative infrared fixed-point. Using the Banks-Zaks expansion the authors study the effect of the large-order behavior of the perturbative series on the conformal coefficients. The authors find that in general these coefficients become factorially increasing. However, when the factorial behavior genuinely originates in a renormalon integral, as implied by a postulated skeleton expansion, it does not affect the conformal coefficients. As a consequence, the conformal coefficients will indeed be free of renormalon divergence, in accordance with previous observations concerning the smallness of these coefficients for specific observables. The authors further show that the correspondence of the BLM method with the skeleton expansion implies a unique scale-setting procedure. The BLM coefficients can be interpreted as the conformal coefficients in the series relating the fixed-point value of the observable with that of the skeleton effective charge. Through the skeleton expansion the relevance of renormalon-free conformal coefficients extends to real-world QCD.

  17. Randomized Controlled Trial of Electronic Care Plan Alerts and Resource Utilization by High Frequency Emergency Department Users with Opioid Use Disorder

    Directory of Open Access Journals (Sweden)

    Niels Rathlev, MD

    2016-01-01

    Full Text Available Introduction: There is a paucity of literature supporting the use of electronic alerts for patients with high frequency emergency department (ED use. We sought to measure changes in opioid prescribing and administration practices, total charges and other resource utilization using electronic alerts to notify providers of an opioid-use care plan for high frequency ED patients. Methods: This was a randomized, non-blinded, two-group parallel design study of patients who had 1 opioid use disorder and 2 high frequency ED use. Three affiliated hospitals with identical electronic health records participated. Patients were randomized into “Care Plan” versus “Usual Care groups”. Between the years before and after randomization, we compared as primary outcomes the following: 1 opioids (morphine mg equivalents prescribed to patients upon discharge and administered to ED and inpatients; 2 total medical charges, and the numbers of; 3 ED visits, 4 ED visits with advanced radiologic imaging (computed tomography [CT] or magnetic resonance imaging [MRI] studies, and 5 inpatient admissions. Results: A total of 40 patients were enrolled. For ED and inpatients in the “Usual Care” group, the proportion of morphine mg equivalents received in the post-period compared with the pre-period was 15.7%, while in the “Care Plan” group the proportion received in the post-period compared with the pre-period was 4.5% (ratio=0.29, 95% CI [0.07-1.12]; p=0.07. For discharged patients in the “Usual Care” group, the proportion of morphine mg equivalents prescribed in the post-period compared with the pre-period was 25.7% while in the “Care Plan” group, the proportion prescribed in the post-period compared to the pre-period was 2.9%. The “Care Plan” group showed an 89% greater proportional change over the periods compared with the “Usual Care” group (ratio=0.11, 95% CI [0.01-0.092]; p=0.04. Care plans did not change the total charges, or, the numbers

  18. Heavy precipitation and the responses within emergency management - a new approach for emergency planning and disaster prevention by utilizing fire brigade operation data

    Science.gov (United States)

    Kutschker, Thomas; Glade, Thomas

    2015-04-01

    An increase of intense rainfall events in the center regions of Europe is one of the assumed effects of climate change. Climate scenarios indicate also large seasonal and regional differences concerning the magnitude. Structural damages and financial loss resulting from heavy precipitation depend on natural parameters such as topography and vegetation cover of the specific area, but also on socio-economic parameters such as urbanized and industrialized areas, population density and the presence of critical infrastructure. In particular mudflows and floods cause damages such as flooded basements and streets, undercutting of roads or spilled sewage drains. The emergency management has to consider these effects appropriately. Commonly, this is the responsibilities is taken by the fire brigades and civil protection units. Within their daily routines, numerous data is collected, but commonly not utilized for scientific purposes. In particular fire brigade operation data can be used accordingly to describe the intensity of the aftermath when heavy precipitation strikes a certain area. One application is described in this study based on a example in Offenbach, Germany. The civil protection in Germany is based on a federal system with a bottom-up command-structure and responsibility to the local community. Therefore it is not easy to collect the overall incident data for a widespread affected area. To examine particular local effects of heavy precipitation events it is necessary to match the meteorological data provided by the German Meteorological Service (DWD) with the incident data of all effected fire brigades, which sometimes is impeded by the usual resolution of meteorological data. In this study, a method of comprehensive evaluation of meteorological data and the operation data from local fire brigades has been developed for the Rhine-Main-Area. This area is one of the largest metropolitan regions in Germany with a very high density in population as well as

  19. Expansion program is a challenging project

    International Nuclear Information System (INIS)

    Walker, G.L.

    1992-01-01

    This paper reports that construction is set to begin on the $1.5 billion PGT-PG and E Pipeline Expansion Project. It will consist of 691 miles of 42-in pipeline and 110 miles of 36-in. pipeline, to be built over 2 years. The project, which will transport additional supplies of natural gas to US West Coast markets, has its US regulatory approval in hand. On Oct. 16, 1991, the Federal Energy Regulatory Commission authorized Pacific Gas Transmission Co. to construct its Pacific Northwest segment of the expansion. Pacific Gas and Electric Co. received approval to build its California segment in late 1990 from the California Public Utilities Commission

  20. Scenarios of Expansion to Electric Generation Capacity

    Directory of Open Access Journals (Sweden)

    José Somoza-Cabrera

    2017-06-01

    Full Text Available We show the building scenarios of expansion to electric generation capacity enough to supply the demand to 2050. We were using the LEAP facility (Long-range Energy Alternatives Planning System, to simulate dispatch of electricity at minimum cost. Finally, we show the cost-benefice analysis of the technologies availability, included externality and CO2 emission limited. However that we included the externals cost in this analysis, it results insufficient to closed gap between fossil and renewable technologies of electric generation. Nevertheless, in some opportunities the renewable options had very important participations in the minimal cost scenario of expansion.

  1. Utilizing 18F-fluoroethyltyrosine (FET) positron emission tomography (PET) to define suspected nonenhancing tumor for radiation therapy planning of glioblastoma.

    Science.gov (United States)

    Hayes, Aimee R; Jayamanne, Dasantha; Hsiao, Edward; Schembri, Geoffrey P; Bailey, Dale L; Roach, Paul J; Khasraw, Mustafa; Newey, Allison; Wheeler, Helen R; Back, Michael

    2018-01-31

    The authors sought to evaluate the impact of 18F-fluoroethyltyrosine (FET) positron emission tomography (PET) on radiation therapy planning for patients diagnosed with glioblastoma (GBM) and the presence of suspected nonenhancing tumors compared with standard magnetic resonance imaging (MRI). Patients with GBM and contrast-enhanced MRI scans showing regions suspicious of nonenhancing tumor underwent postoperative FET-PET before commencing radiation therapy. Two clinical target volumes (CTVs) were created using pre- and postoperative MRI: MRI fluid-attenuated inversion recovery (FLAIR) sequences (CTV FLAIR ) and MRI contrast sequences with an expansion on the surgical cavity (CTV Sx ). FET-PET was used to create biological tumor volumes (BTVs) by encompassing FET-avid regions, forming BTV FLAIR and BTV Sx . Volumetric analyses were conducted between CTVs and respective BTVs using Wilcoxon signed-rank tests. The volume increase with addition of FET was analyzed with respect to BTV FLAIR and BTV Sx . Presence of focal gadolinium contrast enhancement within previously nonenhancing tumor or within the FET-avid region was noted on MRI scans at 1 and 3 months after radiation therapy. Twenty-six patients were identified retrospectively from our database, of whom 24 had demonstrable FET uptake. The median CTV FLAIR , CTV Sx , BTV FLAIR , and BTV Sx were 57.1 mL (range, 1.1-217.4), 83.6 mL (range, 27.2-275.8), 62.8 mL (range, 1.1-307.3), and 94.7 mL (range, 27.2-285.5), respectively. When FET-PET was used, there was a mean increase in volume of 26.8% from CTV FLAIR to BTV FLAIR and 20.6% from CTV Sx to BTV Sx . A statistically significant difference was noted on Wilcoxon signed-rank test when assessing volumetric change between CTV FLAIR and BTV FLAIR (P Wilcoxon signed-rank tests. FET-PET may help improve delineation of GBM in cases with a suspected nonenhancing component and reduce the risk of potential geographical miss. Copyright © 2018 American Society for Radiation

  2. Trends in the utilization of dental outpatient services affected by the expansion of health care benefits in South Korea to include scaling: a 6-year interrupted time-series study.

    Science.gov (United States)

    Park, Hee-Jung; Lee, Jun Hyup; Park, Sujin; Kim, Tae-Il

    2018-02-01

    This study utilized a strong quasi-experimental design to test the hypothesis that the implementation of a policy to expand dental care services resulted in an increase in the usage of dental outpatient services. A total of 45,650,000 subjects with diagnoses of gingivitis or advanced periodontitis who received dental scaling were selected and examined, utilizing National Health Insurance claims data from July 2010 through November 2015. We performed a segmented regression analysis of the interrupted time-series to analyze the time-series trend in dental costs before and after the policy implementation, and assessed immediate changes in dental costs. After the policy change was implemented, a statistically significant 18% increase occurred in the observed total dental cost per patient, after adjustment for age, sex, and residence area. In addition, the dental costs of outpatient gingivitis treatment increased immediately by almost 47%, compared with a 15% increase in treatment costs for advanced periodontitis outpatients. This policy effect appears to be sustainable. The introduction of the new policy positively impacted the immediate and long-term outpatient utilization of dental scaling treatment in South Korea. While the policy was intended to entice patients to prevent periodontal disease, thus benefiting the insurance system, our results showed that the policy also increased treatment accessibility for potential periodontal disease patients and may improve long-term periodontal health in the South Korean population.

  3. Trends in the utilization of dental outpatient services affected by the expansion of health care benefits in South Korea to include scaling: a 6-year interrupted time-series study

    Science.gov (United States)

    2018-01-01

    Purpose This study utilized a strong quasi-experimental design to test the hypothesis that the implementation of a policy to expand dental care services resulted in an increase in the usage of dental outpatient services. Methods A total of 45,650,000 subjects with diagnoses of gingivitis or advanced periodontitis who received dental scaling were selected and examined, utilizing National Health Insurance claims data from July 2010 through November 2015. We performed a segmented regression analysis of the interrupted time-series to analyze the time-series trend in dental costs before and after the policy implementation, and assessed immediate changes in dental costs. Results After the policy change was implemented, a statistically significant 18% increase occurred in the observed total dental cost per patient, after adjustment for age, sex, and residence area. In addition, the dental costs of outpatient gingivitis treatment increased immediately by almost 47%, compared with a 15% increase in treatment costs for advanced periodontitis outpatients. This policy effect appears to be sustainable. Conclusions The introduction of the new policy positively impacted the immediate and long-term outpatient utilization of dental scaling treatment in South Korea. While the policy was intended to entice patients to prevent periodontal disease, thus benefiting the insurance system, our results showed that the policy also increased treatment accessibility for potential periodontal disease patients and may improve long-term periodontal health in the South Korean population. PMID:29535886

  4. Expected utility without utility

    OpenAIRE

    Castagnoli, E.; Licalzi, M.

    1996-01-01

    This paper advances an interpretation of Von Neumann–Morgenstern’s expected utility model for preferences over lotteries which does not require the notion of a cardinal utility over prizes and can be phrased entirely in the language of probability. According to it, the expected utility of a lottery can be read as the probability that this lottery outperforms another given independent lottery. The implications of this interpretation for some topics and models in decision theory are considered....

  5. Utilizing coal remaining resources and post-mining land use planning based on GIS-based optimization method : study case at PT Adaro coal mine in South Kalimantan

    Directory of Open Access Journals (Sweden)

    Mohamad Anis

    2017-06-01

    Full Text Available Coal mining activities may cause a series of environmental and socio-economic issues in communities around the mining area. Mining can become an obstacle to environmental sustainability and a major hidden danger to the security of the local ecology. Therefore, the coal mining industry should follow some specific principles and factors in achieving sustainable development. These factors include geological conditions, land use, mining technology, environmental sustainability policies and government regulations, socio-economic factors, as well as sustainability optimization for post-mining land use. Resources of the remains of the coal which is defined as the last remaining condition of the resources and reserves of coal when the coal companies have already completed the life of the mine or the expiration of the licensing contract (in accordance with government permission. This research uses approch of knowledge-driven GIS based methods mainly Analytical Hierarchy Process (AHP and Fuzzy logic for utilizing coal remaining resources and post-mining land use planning. The mining area selected for this study belongs to a PKP2B (Work Agreement for Coal Mining company named Adaro Indonesia (PT Adaro. The result shows that geologically the existing formation is dominated by Coal Bearing Formation (Warukin Formation which allows the presence of remains coal resource potential after the lifetime of mine, and the suitability of rubber plantation for the optimization of land use in all mining sites and also in some disposal places in conservation areas and protected forests.

  6. LANDFIRE 2015 Remap – Utilization of Remotely Sensed Data to Classify Existing Vegetation Type and Structure to Support Strategic Planning and Tactical Response

    Science.gov (United States)

    Picotte, Joshua J.; Long, Jordan; Peterson, Birgit; Nelson, Kurtis

    2017-01-01

    The LANDFIRE Program produces national scale vegetation, fuels, fire regimes, and landscape disturbance data for the entire U.S. These data products have been used to model the potential impacts of fire on the landscape [1], the wildfire risks associated with land and resource management [2, 3], and those near population centers and accompanying Wildland Urban Interface zones [4], as well as many other applications. The initial LANDFIRE National Existing Vegetation Type (EVT) and vegetation structure layers, including vegetation percent cover and height, were mapped circa 2001 and released in 2009 [5]. Each EVT is representative of the dominant plant community within a given area. The EVT layer has since been updated by identifying areas of landscape change and modifying the vegetation types utilizing a series of rules that consider the disturbance type, severity of disturbance, and time since disturbance [6, 7]. Non-disturbed areas were adjusted for vegetation growth and succession. LANDFIRE vegetation structure layers also have been updated by using data modeling techniques [see 6 for a full description]. The subsequent updated versions of LANDFIRE include LANDFIRE 2008, 2010, 2012, and LANDFIRE 2014 is being incrementally released, with all data being released in early 2017. Additionally, a comprehensive remap of the baseline data, LANDFIRE 2015 Remap, is being prototyped, and production is tentatively planned to begin in early 2017 to provide a more current baseline for future updates.

  7. Thermal expansion data

    International Nuclear Information System (INIS)

    Taylor, D.

    1984-01-01

    This paper gives regression data for a modified second order polynomial fitted to the expansion data of, and percentage expansions for dioxides with (a) the fluorite and antifluorite structure: AmO 2 , BkO 2 , CeO 2 , CmO 2 , HfO 2 , Li 2 O, NpO 2 , PrO 2 , PuO 2 , ThO 2 , UO 2 , ZrO 2 , and (b) the rutile structure: CrO 2 , GeO 2 , IrO 2 , MnO 2 , NbO 2 , PbO 2 , SiO 2 , SnO 2 , TeO 2 , TiO 2 and VO 2 . Reduced expansion curves for the dioxides showed only partial grouping into iso-electronic series for the fluorite structures and showed that the 'law of corresponding states' did not apply to the rutile structures. (author)

  8. Uniform gradient expansions

    CERN Document Server

    Giovannini, Massimo

    2015-01-01

    Cosmological singularities are often discussed by means of a gradient expansion that can also describe, during a quasi-de Sitter phase, the progressive suppression of curvature inhomogeneities. While the inflationary event horizon is being formed the two mentioned regimes coexist and a uniform expansion can be conceived and applied to the evolution of spatial gradients across the protoinflationary boundary. It is argued that conventional arguments addressing the preinflationary initial conditions are necessary but generally not sufficient to guarantee a homogeneous onset of the conventional inflationary stage.

  9. Low-temperature thermal expansion

    International Nuclear Information System (INIS)

    Collings, E.W.

    1986-01-01

    This chapter discusses the thermal expansion of insulators and metals. Harmonicity and anharmonicity in thermal expansion are examined. The electronic, magnetic, an other contributions to low temperature thermal expansion are analyzed. The thermodynamics of the Debye isotropic continuum, the lattice-dynamical approach, and the thermal expansion of metals are discussed. Relative linear expansion at low temperatures is reviewed and further calculations of the electronic thermal expansion coefficient are given. Thermal expansions are given for Cu, Al and Ti. Phenomenologic thermodynamic relationships are also discussed

  10. Electricity highways. End of the planning in the slow lane? Constitutional appraisal of some aspects of the Act of Acceleation of the Network Expansion; Stromautobahnen. Ende der Planung auf der Kriechspur? Verfassungsrechtliche Wuerdigung einiger Aspekte des Netzausbaubeschleunigungsgesetzes

    Energy Technology Data Exchange (ETDEWEB)

    Mikesic, Ivana; Strauch, Boris [Salans LLP, Frankfurt am Main (Germany); Salans LLP, Berlin (Germany)

    2011-10-15

    Since the adoption of the Merseburg 2007 benchmark paper, the issue of accelerating the expansion of the German power transmission network entirely is at the top of the political agenda. Little has been done so far. Now the Act for the Acceleration of Network Expansion shall regulate this according to the benchmark paper of the Federal Ministry of Economics and Technology (Berlin, Federal Republic of Germany). The expectations of the Ministry raise complex constitutional issues regarding the allocation of legislative powers to the State and Federal Authorities. The constitutional amendments within the scope of the reform of federalism I are put on the test bench by the draft.

  11. The Comparison and Modeling of the Driving Factors of Urban Expansion for Thirty-Five Big Cities in the Three Regions in China

    Directory of Open Access Journals (Sweden)

    Tian Guangjin

    2016-01-01

    Full Text Available This paper presents a national- and regional-scale urban growth model (NRUGM of China based on panel data analysis. Through the panel analysis, population growth, road construction, salary increment per capita, and secondary industry product increment were proven to be the major driving factors for national-scale urban expansion. According to Seventh Five-Year Plan, China had been divided into three regions, Eastern China, Middle China, and Western China, by their geographic position and economic development. We studied the relationship between urban expansion and the driving factors for the three regions between 1990 and 2010 in China. The driving factors of urban expansion were different for the different regions and periods. Population growth and road construction were identified as the two major factors driving urban expansion for Eastern China. Secondary industry and economic development had become the major driving factors for urban expansion over the last twenty years in Middle China. Over the same period, for Western China, economic growth had become the major driving factor for urban expansion. Our results have significant policy implications for China. The macrocontrol of the central government should utilize different policies to adjust urban expansion in the different regions.

  12. Lace expansion for dummies

    NARCIS (Netherlands)

    Bolthausen, Erwin; Van Der Hofstad, Remco; Kozma, Gady

    2018-01-01

    We show Green's function asymptotic upper bound for the two-point function of weakly self-Avoiding walk in d >4, revisiting a classic problem. Our proof relies on Banach algebras to analyse the lace-expansion fixed point equation and is simpler than previous approaches in that it avoids Fourier

  13. OPEC future capacity expansions

    International Nuclear Information System (INIS)

    Sandrea, I.

    2005-01-01

    This conference presentation examined OPEC future capacity expansions including highlights from 2000-2004 from the supply perspective and actions by OPEC; OPEC spare capacity in 2005/2006; medium-term capacity expansion and investments; long-term scenarios, challenges and opportunities; and upstream policies in member countries. Highlights from the supply perspective included worst than expected non-OPEC supply response; non-OPEC supply affected by a number of accidents and strikes; geopolitical tensions; and higher than expected demand for OPEC crude. OPEC's actions included closer relationship with other producers and consumers; capacity expansions in 2004 and 2005/2006; and OPEC kept the market well supplied with crude in 2004. The presentation also provided data using graphical charts on OPEC net capacity additions until 2005/2006; OPEC production versus spare capacity from 2003 to 2005; OPEC production and capacity to 2010; and change in required OPEC production from 2005-2020. Medium term expansion to 2010 includes over 60 projects. Medium-term risks such as project execution, financing, costs, demand, reserves, depletion, integration of Iraq, and geopolitical tensions were also discussed. The presentation concluded that in the long term, large uncertainties remain; the peak of world supply is not imminent; and continued and enhanced cooperation is essential to market stability. tabs., figs

  14. AUTO-EXPANSIVE FLOW

    Science.gov (United States)

    Physics suggests that the interplay of momentum, continuity, and geometry in outward radial flow must produce density and concomitant pressure reductions. In other words, this flow is intrinsically auto-expansive. It has been proposed that this process is the key to understanding...

  15. PEMILIHAN STRATEGI BISNIS DENGAN MENGGUNAKAN QSPM (QUANTITATIVE STRATEGIC PLANNING MATRIX DAN MODEL MAUT (MULTI ATTRIBUTE UTILITY THEORY (STUDI KASUS PADA SENTRA INDUSTRI GERABAH KASONGAN, BANTUL, YOGYAKARTA

    Directory of Open Access Journals (Sweden)

    Nia Budi Puspitasari

    2013-09-01

    Full Text Available Industri Kecil Menengah (IKM gerabah yang terletak di kecamatan Kasongan, kabupaten Bantul, Yogyakarta ini merupakan salah satu sentra industri gerabah Indonesia yang sedang berkembang untuk pasar domestik dan luar negeri.Menurut data statistik Provinsi Daerah Istimewa Yogyakarta (DIY, IKM mempunyai daya serap pekerja yang cukup banyak.Perkembangan tersebut perlu diiringi dengan adanya sistem pemasaran yang baik dalam IKM tersebut.Adanya penurunan penjulaan pada beberapa tahun terakhir dan kurang baiknya metode strategi pemasaran merupakan penyebab munculnya masalah –masalah dalam hal penjualan di Industri IKM Gerabah Kasongan, Yogyakarta.Analisis lingkungan eksternal dan lingkungan internal dapat dijadikan acuan utama untuk melakukan perbaikan strategi pemasaran.Analisis lingkungan ekternal dan internal tersebut digabungkan dengan analisis SWOT, kemudian dilakukan penetapan prioritas strategi dari hasil analisis SWOT dengan matriks QSPM (Quantitative Strategic Planning Matrix. Model MAUT (Multi Attribute Utility Theory juga digunakan untuk membandingakan prioritas strategi bisnis dengan melihat segi infrastruktur, waktu, cost dan pendapat pengusaha dalam penelitian ini. Dari hasil penelitian bahwa ini Industri IKM dapat melakukan strategi  pengembangan produk dan penetrasi pasar. Selain itu membuat desa Kasongan lebih menarik dengan mengembangkan desa menjadi daerah wisata yang memang menarik untuk dikunjungi. Kesiapan ini juga diiringi dengan adanya kesiaapan oleh masyarakat dan para pengusaha dengan lebih mengembangkan produknya dengan melakukan diversifikasi produk dengan bahan baku yang sama yaitu tanah tersebut. Kata Kunci : strategi bisnis, SWOT, QSPM, model MAUT Abstract The Gerabah Small and Mid-sized Industrial Firm (IKM placed in Kasongan, Bantul, Yogyakarta is one of the central industry of Indonesian gerabah, which is now currently develop into domestic and international market.According to the statistical data from the Local

  16. Simplified Technique for Predicting Offshore Pipeline Expansion

    Science.gov (United States)

    Seo, J. H.; Kim, D. K.; Choi, H. S.; Yu, S. Y.; Park, K. S.

    2018-06-01

    In this study, we propose a method for estimating the amount of expansion that occurs in subsea pipelines, which could be applied in the design of robust structures that transport oil and gas from offshore wells. We begin with a literature review and general discussion of existing estimation methods and terminologies with respect to subsea pipelines. Due to the effects of high pressure and high temperature, the production of fluid from offshore wells is typically caused by physical deformation of subsea structures, e.g., expansion and contraction during the transportation process. In severe cases, vertical and lateral buckling occurs, which causes a significant negative impact on structural safety, and which is related to on-bottom stability, free-span, structural collapse, and many other factors. In addition, these factors may affect the production rate with respect to flow assurance, wax, and hydration, to name a few. In this study, we developed a simple and efficient method for generating a reliable pipe expansion design in the early stage, which can lead to savings in both cost and computation time. As such, in this paper, we propose an applicable diagram, which we call the standard dimensionless ratio (SDR) versus virtual anchor length (L A ) diagram, that utilizes an efficient procedure for estimating subsea pipeline expansion based on applied reliable scenarios. With this user guideline, offshore pipeline structural designers can reliably determine the amount of subsea pipeline expansion and the obtained results will also be useful for the installation, design, and maintenance of the subsea pipeline.

  17. Japan prime s LNG utilization expansion and supply power analysis. ; Structuring mutual reliance relationship with project partners is urged. Nippon no LNG riyo kakudai to kyokyuryoku bunseki. ; Projectter dot partner kan no shinrai kankei no kochiku wo

    Energy Technology Data Exchange (ETDEWEB)

    Sato, M [Mitsubishi Corp., Tokyo (Japan)

    1991-10-01

    The Brunei Project is a joint venture among the Brunei Government, Shell and Mitsubishi Shoji, but when its supply began in 1972, the share ownership has consisted of Mitsubishi Shoji and Shell at 45% respectively and the Brunei Government at 10%. The mutual reliance relationship among the project partners has been built gradually in such ways as Shell has built an agricultural vocational school inviting professors specialized in agriculture from England. Mitsubishi has created a large-scale cattle breeding business and produced beef cattles under the severe tropical environment, with an unfortunate result that the production cost did not balance with the market price. Recently, three Japanese agricultural engineers have succeeded at last producing tomatoes, cucumbers and lettuces through endeavors of vegetable production by means of hydroponic processes. The Brunei Goverment is also planning to cultivate fish and shells. Meanwhile the voices from the working site stress strongly that the operation has been continued with the safety-first concept at all times.

  18. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  19. Financing electricity expansion

    International Nuclear Information System (INIS)

    Hyman, L.S.

    1994-01-01

    Expansion of electricity supply is associated with economic development. The installation and enlargement of power systems in developing countries entails a huge financial burden, however. Energy consumers in such countries must pay not only for supplies but for the cost of raising the capital for expansion on the international markets. Estimates are presented for the capital expenditure for electricity supply over the period 1990 to 2020 for the major world regions, using approximations for the cost of plant and capital and for the returns earned. These data lead to the conclusion that the five regions with the lowest per capita incomes are those which will need the major part of the capital expenditure and the highest percentage of external finance. (6 tables) (UK)

  20. Bigravity from gradient expansion

    International Nuclear Information System (INIS)

    Yamashita, Yasuho; Tanaka, Takahiro

    2016-01-01

    We discuss how the ghost-free bigravity coupled with a single scalar field can be derived from a braneworld setup. We consider DGP two-brane model without radion stabilization. The bulk configuration is solved for given boundary metrics, and it is substituted back into the action to obtain the effective four-dimensional action. In order to obtain the ghost-free bigravity, we consider the gradient expansion in which the brane separation is supposed to be sufficiently small so that two boundary metrics are almost identical. The obtained effective theory is shown to be ghost free as expected, however, the interaction between two gravitons takes the Fierz-Pauli form at the leading order of the gradient expansion, even though we do not use the approximation of linear perturbation. We also find that the radion remains as a scalar field in the four-dimensional effective theory, but its coupling to the metrics is non-trivial.

  1. Expansion of magnetic clouds

    International Nuclear Information System (INIS)

    Suess, S.T.

    1987-01-01

    Magnetic clouds are a carefully defined subclass of all interplanetary signatures of coronal mass ejections whose geometry is thought to be that of a cylinder embedded in a plane. It has been found that the total magnetic pressure inside the clouds is higher than the ion pressure outside, and that the clouds are expanding at 1 AU at about half the local Alfven speed. The geometry of the clouds is such that even though the magnetic pressure inside is larger than the total pressure outside, expansion will not occur because the pressure is balanced by magnetic tension - the pinch effect. The evidence for expansion of clouds at 1 AU is nevertheless quite strong so another reason for its existence must be found. It is demonstrated that the observations can be reproduced by taking into account the effects of geometrical distortion of the low plasma beta clouds as they move away from the Sun

  2. Electrochemical detection of DNA triplet repeat expansion

    Czech Academy of Sciences Publication Activity Database

    Fojta, Miroslav; Havran, Luděk; Vojtíšková, Marie; Paleček, Emil

    2004-01-01

    Roč. 126, č. 21 (2004), s. 6532-6533 ISSN 0002-7863 R&D Projects: GA AV ČR IAA4004402; GA AV ČR IBS5004355; GA AV ČR KJB4004302; GA AV ČR KSK4055109 Institutional research plan: CEZ:AV0Z5004920 Keywords : DNA triplet repeat expansion * PCR amplification * neurodegenerative diseases Subject RIV: BO - Biophysics Impact factor: 6.903, year: 2004

  3. Symmetric eikonal expansion

    International Nuclear Information System (INIS)

    Matsuki, Takayuki

    1976-01-01

    Symmetric eikonal expansion for the scattering amplitude is formulated for nonrelativistic and relativistic potential scatterings and also for the quantum field theory. The first approximations coincide with those of Levy and Sucher. The obtained scattering amplitudes are time reversal invariant for all cases and are crossing symmetric for the quantum field theory in each order of approximation. The improved eikonal phase introduced by Levy and Sucher is also derived from the different approximation scheme from the above. (auth.)

  4. Series expansions without diagrams

    International Nuclear Information System (INIS)

    Bhanot, G.; Creutz, M.; Horvath, I.; Lacki, J.; Weckel, J.

    1994-01-01

    We discuss the use of recursive enumeration schemes to obtain low- and high-temperature series expansions for discrete statistical systems. Using linear combinations of generalized helical lattices, the method is competitive with diagrammatic approaches and is easily generalizable. We illustrate the approach using Ising and Potts models. We present low-temperature series results in up to five dimensions and high-temperature series in three dimensions. The method is general and can be applied to any discrete model

  5. Analysis of the value of battery storage with wind and photovoltaic generation to the Sacramento Municipal Utility District

    Energy Technology Data Exchange (ETDEWEB)

    Zaininger, H.W. [Zaininger Engineering Co., Inc., Roseville, CA (United States)

    1998-08-01

    This report describes the results of an analysis to determine the economic and operational value of battery storage to wind and photovoltaic (PV) generation technologies to the Sacramento Municipal Utility District (SMUD) system. The analysis approach consisted of performing a benefit-cost economic assessment using established SMUD financial parameters, system expansion plans, and current system operating procedures. This report presents the results of the analysis. Section 2 describes expected wind and PV plant performance. Section 3 describes expected benefits to SMUD associated with employing battery storage. Section 4 presents preliminary benefit-cost results for battery storage added at the Solano wind plant and the Hedge PV plant. Section 5 presents conclusions and recommendations resulting from this analysis. The results of this analysis should be reviewed subject to the following caveat. The assumptions and data used in developing these results were based on reports available from and interaction with appropriate SMUD operating, planning, and design personnel in 1994 and early 1995 and are compatible with financial assumptions and system expansion plans as of that time. Assumptions and SMUD expansion plans have changed since then. In particular, SMUD did not install the additional 45 MW of wind that was planned for 1996. Current SMUD expansion plans and assumptions should be obtained from appropriate SMUD personnel.

  6. Communication Planning.

    Science.gov (United States)

    Development Communication Report, 1978

    1978-01-01

    Communication planning in developing countries is discussed in individual articles on theory, knowledge production and utilization, planning at the regional level, software, and rural development. A nutrition education project and three experiments in developing educational materials with feedback from villagers in Africa are described in the…

  7. Study on the status of radiation/radioisotope utilization during the last 5 years

    International Nuclear Information System (INIS)

    Lee, Yun Jong; Park, Tae Jin; Kuk, Il Hiun

    2007-01-01

    The objectives of this study is derivation of important indices for establishing government policy to promote radiation and radioisotope utilization and for setting up effective strategy o develop related industries, on the basis of utilization data, and deduction of economic scale induced by using radiation and radioisotope, through the analysis of economic contribution by multi-variate model. Uses of radiation and radioisotopes are increasing annually in Korea, and the effect of utilization to economy and industry is continuously enlarged in accordance with technology development and expansion of radiation and radioisotope uses. Indices related to radiation nd radioisotope uses, which are useful for the promotion of utilization and establishment of development strategy, have to be derived and updated every year. Important indices related to radiation and radioisotope utilization are derived through the study. The indices are useful for planning establishing, and revising policies to promote radiation and radioisotope utilization, and re furthermore valuable for public acceptance nuclear energy

  8. Capacity Expansion Modeling for Storage Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Hale, Elaine; Stoll, Brady; Mai, Trieu

    2017-04-03

    The Resource Planning Model (RPM) is a capacity expansion model designed for regional power systems and high levels of renewable generation. Recent extensions capture value-stacking for storage technologies, including batteries and concentrating solar power with storage. After estimating per-unit capacity value and curtailment reduction potential, RPM co-optimizes investment decisions and reduced-form dispatch, accounting for planning reserves; energy value, including arbitrage and curtailment reduction; and three types of operating reserves. Multiple technology cost scenarios are analyzed to determine level of deployment in the Western Interconnection under various conditions.

  9. Facility Utilization Reports - FAA Aviation Information Utilization Reports

    Data.gov (United States)

    Department of Transportation — Provides: (1) Space management and planning, including area calculations, tracking space by organization and employee, and monitoring space utilization information....

  10. Right ventricular functional analysis utilizing first pass radionuclide angiography for pre-operative ventricular assist device planning: a multi-modality comparison.

    Science.gov (United States)

    Avery, Ryan; Day, Kevin; Jokerst, Clinton; Kazui, Toshinobu; Krupinski, Elizabeth; Khalpey, Zain

    2017-10-10

    Advanced heart failure treated with a left ventricular assist device is associated with a higher risk of right heart failure. Many advanced heart failures patients are treated with an ICD, a relative contraindication to MRI, prior to assist device placement. Given this limitation, left and right ventricular function for patients with an ICD is calculated using radionuclide angiography utilizing planar multigated acquisition (MUGA) and first pass radionuclide angiography (FPRNA), respectively. Given the availability of MRI protocols that can accommodate patients with ICDs, we have correlated the findings of ventricular functional analysis using radionuclide angiography to cardiac MRI, the reference standard for ventricle function calculation, to directly correlate calculated ejection fractions between these modalities, and to also assess agreement between available echocardiographic and hemodynamic parameters of right ventricular function. A retrospective review from January 2012 through May 2014 was performed to identify advanced heart failure patients who underwent both cardiac MRI and radionuclide angiography for ventricular functional analysis. Nine heart failure patients (8 men, 1 woman; mean age of 57.0 years) were identified. The average time between the cardiac MRI and radionuclide angiography exams was 38.9 days (range: 1 - 119 days). All patients undergoing cardiac MRI were scanned using an institutionally approved protocol for ICD with no device-related complications identified. A retrospective chart review of each patient for cardiomyopathy diagnosis, clinical follow-up, and echocardiogram and right heart catheterization performed during evaluation was also performed. The 9 patients demonstrated a mean left ventricular ejection fraction (LVEF) using cardiac MRI of 20.7% (12 - 40%). Mean LVEF using MUGA was 22.6% (12 - 49%). The mean right ventricular ejection fraction (RVEF) utilizing cardiac MRI was 28.3% (16 - 43%), and the mean RVEF calculated by

  11. Expansions for Coulomb wave functions

    NARCIS (Netherlands)

    Boersma, J.

    1969-01-01

    In this paper we derive a number of expansions for Whittaker functions, regular and irregular Coulomb wave functions. The main result consists of a new expansion for the irregular Coulomb wave functions of orders zero and one in terms of regular Coulomb wave functions. The latter expansions are

  12. Radial expansion and multifragmentation

    International Nuclear Information System (INIS)

    Angelique, J.C.; Bizard, G.; Bougault, R.; Brou, R.; Buta, A.; Colin, J.; Cussol, D.; Durand, D.; Kerambrun, A.; Le Brun, C.; Lecolley, J.F.; Lopez, O.; Louvel, M.; Meslin, C.; Nakagawa, T.; Patry, J.P.; Peter, J.; Popescu, R.; Regimbart, R.; Steckmeyer, J.C.; Tamain, B.; Vient, E.; Yuasa-Nakagawa, K.; Wieloch, A.

    1998-01-01

    The light systems 36 Ar + 27 Al and 64 Zn + nat Ti were measured at several bombarding energies between ∼ 35 and 95 MeV/nucleon. It was found that the predominant part of the cross section is due to binary collisions. In this paper the focus is placed on the properties of the quasi-projectile nuclei. In the central collisions the excitation energies of the quasi-projectile reach values exceeding largely 10 MeV/nucleon. The slope of the high energy part of the distribution can give only an upper limit of the apparent temperature (the average temperature along the decay chain). The highly excited quasi-projectile may get rapidly fragmented rather than sequentially. The heavy fragments are excited and can emit light particles (n, p, d, t, 3 He, α,...) what perturbs additionally the spectrum of these particles. Concerning the expansion energy, one can determine the average kinetic energies of the product (in the quasi-projectile-framework) and compare with simulation values. To fit the experimental data an additional radial expansion energy is to be considered. The average expansion energy depends slightly on the impact parameter but it increases with E * / A, ranging from 0.4 to 1,2 MeV/nucleon for an excitation energy increasing from 7 to 10.5 MeV/nucleon. This collective radial energy seems to be independent of the fragment mass, what is possibly valid for the case of larger quasi-projectile masses. The origin of the expansion is to be determined. It may be due to a compression in the interaction zone at the initial stage of the collision, which propagates in the quasi-projectile and quasi-target, or else, may be due, simply, to the increase of thermal energy leading to a rapid fragment emission. The sequential de-excitation calculation overestimates light particle emission and consequently heavy residues, particularly, at higher excitation energies. This disagreement indicates that a sequential process can not account for the di-excitation of very hot nuclei

  13. Rethinking expansive learning

    DEFF Research Database (Denmark)

    Kolbæk, Ditte; Lundh Snis, Ulrika

    Abstract: This paper analyses an online community of master’s students taking a course in ICT and organisational learning. The students initiated and facilitated an educational design for organisational learning called Proactive Review in the organisation where they are employed. By using an online...... discussion forum on Google groups, they created new ways of reflecting and learning. We used netnography to select qualitative postings from the online community and expansive learning concepts for data analysis. The findings show how students changed practices of organisational learning...

  14. Load regulating expansion fixture

    International Nuclear Information System (INIS)

    Wagner, L.M.; Strum, M.J.

    1998-01-01

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located there between. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig

  15. Utility of 3D Reconstruction of 2D Liver Computed Tomography/Magnetic Resonance Images as a Surgical Planning Tool for Residents in Liver Resection Surgery.

    Science.gov (United States)

    Yeo, Caitlin T; MacDonald, Andrew; Ungi, Tamas; Lasso, Andras; Jalink, Diederick; Zevin, Boris; Fichtinger, Gabor; Nanji, Sulaiman

    A fundamental aspect of surgical planning in liver resections is the identification of key vessel tributaries to preserve healthy liver tissue while fully resecting the tumor(s). Current surgical planning relies primarily on the surgeon's ability to mentally reconstruct 2D computed tomography/magnetic resonance (CT/MR) images into 3D and plan resection margins. This creates significant cognitive load, especially for trainees, as it relies on image interpretation, anatomical and surgical knowledge, experience, and spatial sense. The purpose of this study is to determine if 3D reconstruction of preoperative CT/MR images will assist resident-level trainees in making appropriate operative plans for liver resection surgery. Ten preoperative patient CT/MR images were selected. Images were case-matched, 5 to 2D planning and 5 to 3D planning. Images from the 3D group were segmented to create interactive digital models that the resident can manipulate to view the tumor(s) in relation to landmark hepatic structures. Residents were asked to evaluate the images and devise a surgical resection plan for each image. The resident alternated between 2D and 3D planning, in a randomly generated order. The primary outcome was the accuracy of resident's plan compared to expert opinion. Time to devise each surgical plan was the secondary outcome. Residents completed a prestudy and poststudy questionnaire regarding their experience with liver surgery and the 3D planning software. Senior level surgical residents from the Queen's University General Surgery residency program were recruited to participate. A total of 14 residents participated in the study. The median correct response rate was 2 of 5 (40%; range: 0-4) for the 2D group, and 3 of 5 (60%; range: 1-5) for the 3D group (p surgery planning increases accuracy of resident surgical planning and decreases amount of time required. 3D reconstruction would be a useful model for improving trainee understanding of liver anatomy and surgical

  16. National Utility Rate Database: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ong, S.; McKeel, R.

    2012-08-01

    When modeling solar energy technologies and other distributed energy systems, using high-quality expansive electricity rates is essential. The National Renewable Energy Laboratory (NREL) developed a utility rate platform for entering, storing, updating, and accessing a large collection of utility rates from around the United States. This utility rate platform lives on the Open Energy Information (OpenEI) website, OpenEI.org, allowing the data to be programmatically accessed from a web browser, using an application programming interface (API). The semantic-based utility rate platform currently has record of 1,885 utility rates and covers over 85% of the electricity consumption in the United States.

  17. Thermal expansion of granite rocks

    International Nuclear Information System (INIS)

    Stephansson, O.

    1978-04-01

    The thermal expansion of rocks is strongly controlled by the thermal expansion of the minerals. The theoretical thermal expansion of the Stripa Granite is gound to be 21 . 10 -6 [deg C] -1 at 25 deg C and 38 . 10 -6 [deg C] -1 at 400 deg C. The difference in expansion for the rock forming minerals causes micro cracking at heating. The expansion due to micro cracks is found to be of the same order as the mineral expansion. Most of the micro cracks will close at pressures of the order of 10 - 20 MPa. The thermal expansion of a rock mass including the effect of joints is determined in the pilot heater test in the Stripa Mine

  18. Measuring of tube expansion

    International Nuclear Information System (INIS)

    Vogeleer, J. P.

    1985-01-01

    The expansion of the primary tubes or sleeves of the steam generator of a nuclear reactor plant are measured while the tubes or sleeves are being expanded. A primary tube or sleeve is expanded by high pressure of water which flows through a channel in an expander body. The water is supplied through an elongated conductor and is introduced through a connector on the shank connected to the conductor at its outer end. A wire extends through the mandrel and through the conductor to the end of the connector. At its inner end the wire is connected to a tapered pin which is subject to counteracting forces produced by the pressure of the water. The force on the side where the wire is connected to the conductor is smaller than on the opposite side. The tapered pin is moved in the direction of the higher force and extrudes the wire outwardly of the conductor. The tapered surface of the tapered pin engages transverse captive plungers which are maintained in engagement with the expanding tube or sleeve as they are moved outwardly by the tapered pin. The wire and the connector extend out of the generator and, at its outer end, the wire is connected to an indicator which measures the extent to which the wire is moved by the tapered pin, thus measuring the expansion of the tube or sleeve as it progresses

  19. Techniques of artificial intelligence applied to the electric power expansion distribution system planning problem; Tecnicas de inteligencia artificial aplicadas ao problema de planejamento da expansao do sistema de distribuicao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Froes, Salete Maria

    1996-07-01

    A tool named Constrained Decision Problem (CDP), which is based on Artificial Intelligence and a specific application to Distribution System Planning is described. The CDP allows multiple objective optimization that does not, necessarily, result in a single optimal solution. First, a literature review covers published works related to Artificial Intelligence applications to Electric Power Distribution Systems, emphasizing feeder restoration and reconfiguration. Some concepts related to Artificial Intelligence are described, with particular attention to Planning and to Constrained Decision Problems. Following, an Electric Power System planning model is addressed by using the CDP tool. Some case studies illustrate the Distribution Planning model, which are compared with standard optimization models. Concluding, some comments establishing the possibilities of CDP applications are followed by a view on future developments. (author)

  20. Use of Expansion Turbines in Natural Gas Pressure Reduction Stations

    Directory of Open Access Journals (Sweden)

    Poživil Jaroslav

    2004-09-01

    Full Text Available Through the use of expansion turbines in natural gas pressure reduction stations it is possible to produce clean, “green” electricity.Such energy recovery unit utilize the potential energy of natural gas being delivered under high pressure. Expansion turbines are not onlyefficient and profitable but meet the environmental criteria – no emissions of sulfur dioxide, nitrogen oxides or carbon dioxide.

  1. An analysis of strategy plan on business performance of a water utility : a Midvaal water company case study / Erven Sello Malatji

    OpenAIRE

    Malatji, Erven Sello

    2014-01-01

    The purpose of the research was to assess the strategic management process of a water utility in South Africa. The research focused on Midvaal Water Company, a section 21 water utility based in South Africa, North West Province town of Klerksdorp. The objectives of the study were; (a) to assess the organisational level of knowledge when it comes to SMP, (b) to determine different perceptions with regards to SMP between management and employees, (c) to determine the organisational profiles (ag...

  2. Thermal expansion of coking coals

    Energy Technology Data Exchange (ETDEWEB)

    Orlik, M.; Klimek, J. (Vyzkumny a Zkusebni Ustav Nova Hut, Ostrava (Czechoslovakia))

    1992-12-01

    Analyzes expansion of coal mixtures in coke ovens during coking. Methods for measuring coal expansion on both a laboratory and pilot plant scale are comparatively evaluated. The method, developed, tested and patented in Poland by the Institute for Chemical Coal Processing in Zabrze (Polish standard PN-73/G-04522), is discussed. A laboratory device developed by the Institute for measuring coal expansion is characterized. Expansion of black coal from 10 underground mines in the Ostrava-Karvina coal district and from 9 coal mines in the Upper Silesia basin in Poland is comparatively evaluated. Investigations show that coal expansion reaches a maximum for coal types with a volatile matter ranging from 20 to 25%. With increasing volatile matter in coal, its expansion decreases. Coal expansion increases with increasing swelling index. Coal expansion corresponds with coal dilatation. With increasing coal density its expansion increases. Coal mixtures should be selected in such a way that their expansion does not cause a pressure exceeding 40 MPa. 11 refs.

  3. Long-Term Reserve Expansion of Power Systems With High Wind Power Penetration Using Universal Generating Function Methods

    DEFF Research Database (Denmark)

    DING, YI; Wang, Peng; Goel, Lalit

    2010-01-01

    from long term planning point of view utilizing universal generating function (UGF) methods. The reliability models of wind farms and conventional generators are represented as the correspondin UGFs and the special operators for these UGFs are defined to evaluate the customer and the system...... reliabilities. The effect of transmission network on customer reliabilities is also considered in the system UGF. The power output models of wind turbine generators in a wind farm considering wind speed correlation and un-correlation are developed, respectively. A reliability-based reserve expansion method...

  4. Methodology for prioritizing projects considering the generation, transmission and distribution integrated planning and the financial restraints; Metodologia para priorizacao de projetos, considerando o planejamento integrado de geracao, transmissao e distribuicao e as restricoes financeiras

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Denis Claudio Cruz de; Andrade, Eduardo Leopoldino de; Pimentel, Elson Luiz de Almeida; Pinto, Everton Barroso [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    This technical report presents a methodology for economical evaluation and work design priorities in the electric system and the experience of CEMIG, an electric power utility of State of Minas Gerais - Southeast Brazil, in defining its transmission expansion plan. It is presented and discussed the concept of integrated projects for expansion, involving generation, transmission, distribution, automation and telecommunication works 3 refs., 3 figs., 1 tab.

  5. Identity Expansion and Transcendence

    Directory of Open Access Journals (Sweden)

    William Sims Bainbridge

    2014-05-01

    Full Text Available Emerging developments in communications and computing technology may transform the nature of human identity, in the process rendering obsolete the traditional philosophical and scientific frameworks for understanding the nature of individuals and groups.  Progress toward an evaluation of this possibility and an appropriate conceptual basis for analyzing it may be derived from two very different but ultimately connected social movements that promote this radical change. One is the governmentally supported exploration of Converging Technologies, based in the unification of nanoscience, biology, information science and cognitive science (NBIC. The other is the Transhumanist movement, which has been criticized as excessively radical yet is primarily conducted as a dignified intellectual discussion within a new school of philosophy about human enhancement.  Together, NBIC and Transhumanism suggest the immense transformative power of today’s technologies, through which individuals may explore multiple identities by means of online avatars, semi-autonomous intelligent agents, and other identity expansions.

  6. Pareto utility

    NARCIS (Netherlands)

    Ikefuji, M.; Laeven, R.J.A.; Magnus, J.R.; Muris, C.H.M.

    2013-01-01

    In searching for an appropriate utility function in the expected utility framework, we formulate four properties that we want the utility function to satisfy. We conduct a search for such a function, and we identify Pareto utility as a function satisfying all four desired properties. Pareto utility

  7. Cycle expansions: From maps to turbulence

    Science.gov (United States)

    Lan, Y.

    2010-03-01

    We present a derivation, a physical explanation and applications of cycle expansions in different dynamical systems, ranging from simple one-dimensional maps to turbulence in fluids. Cycle expansion is a newly devised powerful tool for computing averages of physical observables in nonlinear chaotic systems which combines many innovative ideas developed in dynamical systems, such as hyperbolicity, invariant manifolds, symbolic dynamics, measure theory and thermodynamic formalism. The concept of cycle expansion has a deep root in theoretical physics, bearing a close analogy to cumulant expansion in statistical physics and effective action functional in quantum field theory, the essence of which is to represent a physical system in a hierarchical way by utilizing certain multiplicative structures such that the dominant parts of physical observables are captured by compact, maneuverable objects while minor detailed variations are described by objects with a larger space and time scale. The technique has been successfully applied to many low-dimensional dynamical systems and much effort has recently been made to extend its use to spatially extended systems. For one-dimensional systems such as the Kuramoto-Sivashinsky equation, the method turns out to be very effective while for more complex real-world systems including the Navier-Stokes equation, the method is only starting to yield its first fruits and much more work is needed to enable practical computations. However, the experience and knowledge accumulated so far is already very useful to a large set of research problems. Several such applications are briefly described in what follows. As more research effort is devoted to the study of complex dynamics of nonlinear systems, cycle expansion will undergo a fast development and find wide applications.

  8. Analysis of Urban Expansion of the Resort City of Al Ain Using Remote Sensing and GIS

    Science.gov (United States)

    Issa, S.; Al Shuwaihi, A.

    2009-12-01

    The urban growth of AL Ain city has been investigated using remote sensing data for three different dates, 1972, 1990 and 2000. We used three Landsat images together with socio-economic data in a post-classification analysis to map the spatial dynamics of land use/cover changes and identify the urbanization process in Al Ain resort city, United Arab Emirates. Land use/cover statistics, extracted from Landsat Multi-spectral Scanner (MSS). Thematic Mapper (TM) and Enhanced Thematic Mapper plus (ETM +) images for 1972. 1990 and 2000 respectively, revealed that the built-up area has expanded by about 170.53km2. The city was found to have a tendency for major expansion in four different directions: along the Abu Dhabi highway, along Dubai highway, Myziad direction and Hafeet recreational area. Expansion in any direction was found to be governed by the availability of road network, suitability for construction, utilities, economic activities, geographical constraints, and legal factors (boundary with Sultanate of Oman). The road network in particular has influenced the spatial patterns and structure of urban development, so that the expansion of the built-up areas has assumed an accretive as well as linear growth along the major roads. The research concludes that the development is based on conservation of agricultural areas (oases) and reclamation of the desert for farming and agricultural activities. The integration of remote sensing and GIS was found to be effective in monitoring LULC changes and providing valuable information necessary for planning and research.

  9. Thermal expansion of beryllium oxide

    International Nuclear Information System (INIS)

    Solodukhin, A.V.; Kruzhalov, A.V.; Mazurenko, V.G.; Maslov, V.A.; Medvedev, V.A.; Polupanova, T.I.

    1987-01-01

    Precise measurements of temperature dependence of the coefficient of linear expansion in the 22-320 K temperature range on beryllium oxide monocrystals are conducted. A model of thermal expansion is suggested; the range of temperature dependence minimum of the coefficient of thermal expansion is well described within the frames of this model. The results of the experiment may be used for investigation of thermal stresses in crystals

  10. The energetic planning and national development; O Planejamento energetico e o desenvolvimento nacional

    Energy Technology Data Exchange (ETDEWEB)

    Dantas, Daniel Ramos [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil)

    2010-07-01

    The demand for energy generated by the Brazilian condition of emerging country reveals that the orderly expansion of energy supply promotes national development. Conversely, lack of energy planning effectively paralyze a country. Since national development is not tied to the economic growth, the observation of the National Policy Principles of Rational Utilization of Energy Resources, and constitutional principles of economic order, give ground to planning. It is the National Energy Policy Council who formulates guidelines and energy policies in Brazil, and have a role in national energy planning. (author)

  11. The utility industry's perspective on OCRWM's plans for developing the system for transporting spent fuel under the Nuclear Waste Policy Act

    International Nuclear Information System (INIS)

    Brodnick, D.A.

    1988-01-01

    The electric utility industry has a vital interest in the transport program to be developed by the Department of Energy's Office of Civilian Radioactive Waste Management under the Nuclear Waste Policy Act. The industry's interest stems in part from the fact that the DOE's transportation program is financed by the Nuclear Waste Fund which is made up of ratepayer funds. However, the industry is also vitally interested in the DOE's transportation program because it could impact the ongoing transportation operations of all nuclear utilities, and, perhaps most importantly, without the utility industry's input, DOE is not able to develop an optimal transportation program. The NWPA contemplates that the DOE conducts its transportation program in accordance with the existing federal and state regulatory structure. DOE has significant discretion, however, in creating and implementing the business, operational and institutional aspects of its NWPA transportation program. The utility industry intends to ensure that the DOE meets the challenge to develop a safe, efficient and economically sound program to transport spent fuel and high-level waste to the appropriate federal facilities

  12. Utilizing the RE-AIM Framework in formative evaluation and program planning for a healthy food choice intervention in the Lower Mississippi Delta

    Science.gov (United States)

    A robust approach to program planning is needed for the development and execution of effective and sustainable behavioral interventions with large public health impact. The purpose of this formative research was to apply dimensions of the RE-AIM (i.e., Reach, Effectiveness, Adoption, Implementation,...

  13. The Perceptions of the Automotive Supply Industry Related to Information Technology Utilization and Creating Barriers to Competitive Market Entry: A Case Study of the Implications for Strategic Planning

    Science.gov (United States)

    Cargal, Joseph L.

    2010-01-01

    The purpose of this study was to examine information technology/systems strategy related factors in the automotive supply industry based on responses to the Strategic Planning and Business Performance Survey provided to automotive suppliers. This population produces supplies to the automotive industry with products valued at hundreds of billions…

  14. Assessing the Utility of the Nominal Group Technique as a Consensus-Building Tool in Extension-Led Avian Influenza Response Planning

    Science.gov (United States)

    Kline, Terence R.

    2013-01-01

    The intent of the project described was to apply the Nominal Group Technique (NGT) to achieve a consensus on Avian Influenza (AI) planning in Northeastern Ohio. Nominal Group Technique is a process first developed by Delbecq, Vande Ven, and Gustafsen (1975) to allow all participants to have an equal say in an open forum setting. A very diverse…

  15. Renormalization group and Mayer expansions

    International Nuclear Information System (INIS)

    Mack, G.

    1984-02-01

    Mayer expansions promise to b