WorldWideScience

Sample records for units technical option

  1. INEL Operable Unit 7-13 containment and stabilization configuration option

    International Nuclear Information System (INIS)

    Raivo, B.D.; Richardson, J.G.; Nickelson, D.F.

    1993-05-01

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory's Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option

  2. [Technical aspects of treatments with single- and multi-unit fixed dental prostheses

    NARCIS (Netherlands)

    Wiersema, E.J.; Kreulen, C.M.; Latzke, P.; Witter, D.J.; Creugers, N.H.J.

    2014-01-01

    For the manufacture of single- and multi-unit fixed dental prostheses, effective communication between dentist and dental technician is required. Mutual insight concerning the (im)possibilities of available treatments and technical options is prerequisitefor this communication. The manufacture of

  3. 24 CFR 982.628 - Homeownership option: Eligible units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Homeownership option: Eligible units. 982.628 Section 982.628 Housing and Urban Development Regulations Relating to Housing and Urban... Types Homeownership Option § 982.628 Homeownership option: Eligible units. (a) Initial requirements...

  4. Technical note An investigation of the franchising option for water ...

    African Journals Online (AJOL)

    Technical note An investigation of the franchising option for water services operation ... of water services, and outlines the need to formulate a franchise model that ... made available to emerging entrepreneurs as the basis of a viable business.

  5. Energy options for the United Kingdom

    International Nuclear Information System (INIS)

    Warner, P.C.

    1979-03-01

    The purpose of this paper is to put together a picture of the energy policy options of the United Kingdom, drawn mainly from official documents but supplemented by comments and conclusions from the author. For some people the current energy debate is simplified down to nuclear power for and against. Much of this thinking seems to arise from misunderstanding, and the more the technical and social facts behind policy can be sorted out by discussions, the more sensible eventual policy will be. One extreme view, for instance, is that opinion is divided between those who are 'pro-industry, pro-production, and pro-nuclear' and those who are 'interested in ecology and therefore anti-nuclear.' Associations like those are high on the list of myths that need to be dispelled. It is therefore a further purpose of this paper to contribute to the general background of facts for those who are interested in this country's energy policies and who may not have time or the opportunity to work through original sources. Although the theme throughout is energy in the United Kingdom, it will be realised that extension to the world scale simply enhances shortages and problems. The paper is in sections, entitled: overall UK energy consumption; coal; oil; gas; the energy gap; alternative energy sources; the balance of primary resource need; electricity; the nuclear power programme; timing of power plant orders; conclusions. (U.K.)

  6. Technical and economic evaluation of controlled disposal options for very low level radioactive wastes

    International Nuclear Information System (INIS)

    Robinson, P.J.; Vance, J.N.

    1990-08-01

    Over the past several years, there has been considerable interest by the nuclear industry in the Nuclear Regulatory Commission (NRC) explicitly defined an activity level in plant waste materials at which the radiological impacts would be so low as to be considered Below Regulatory Concern (BRC). In January 1989, Electric Power Research Institute (EPRI) completed an extensive industry research effort to develop the technical bases for establishing criteria for the disposal of very low activity wastes in ordinary disposal facilities. The Nuclear Management and Resources Council (NUMARC), with assistance from the Edison Electric Institute (EEI) and the Electric Power Research Institute (EPRI), drafted a petition titled: ''Petition for Rulemaking Regarding Disposal of Below Regulatory Concern Radioactive Wastes from Commercial Nuclear Power Plants.'' Subsequent to the industry making a final decision for submittal of the drafted BRC petition, EPRI was requested to evaluate the technical and economic impact of six BRC options. These options are: take no action in pursuing a BRC waste exemption, petition the NRC for authorization to disposal of any BRC waste in any ordinary disposal facility, limit disposal of BRC waste to the nuclear power plant site, limit disposal of BRC waste to the nuclear power plant site and other utility owned property, petition for a mixed waste exemption, and petition for single waste stream exemptions in sequence (i.e. soil, followed by sewage sludge, etc.). The petition and technical bases were written to support the disposal of any BRC waste type in any ordinary disposal facility. These documents do not provide all of the technical and economic information needed to completely assessment the BRC options. This report provides the technical and economic basis for a range of options concerning disposal of very low activity wastes. 3 figs., 20 tabs

  7. Technical/ administrative options for managing tritium MCL exceedances in P-area groundwater and Steel Creek

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-04-01

    This white paper was requested by the Core Team (United States Department of Energy [USDOE], United States Environmental Protection Agency [USEPA], and South Carolina Department of Health and Environmental Control [SCDHEC]) at the P-Area Groundwater (PAGW) Operable Unit (OU) Scoping Meeting held in January 2017 to discuss recent data and potential alternatives in support of a focused Corrective Measures Study/Feasibility Study (CMS/FS). This white paper presents an overview of the problem, and a range of technical and administrative options for addressing the tritium contamination in groundwater and Steel Creek. As tritium cannot be treated practicably, alternatives are limited to media transfer, containment and natural attenuation principally relying on radioactive decay. Using other groundwater OU decisions involving tritium as precedent, Savannah River Nuclear Solutions (SRNS) recommends that final tritium alternatives be evaluated in a CMS/FS, understanding that the likely preferred remedy will include natural attenuation with land use controls (LUCs). This is based on the inability to significantly reduce tritium impact to Steel Creek using an engineered solution as compared to natural attenuation. The timing of this evaluation could be conducted concurrently with the final remedy evaluation for volatile organic compounds (VOCs).

  8. Review of scientific and technical options for the Superconducting Super Collider Program

    International Nuclear Information System (INIS)

    Dombeck, T.

    1993-11-01

    This document is a review of options for the Superconducting Super Collider (SSC) Program. It is the result of an informal study by an ad-hoc working group consisting of Laboratory physicists and engineers who investigated the physics and technical implications of a number of possible alternative SSC programs. Previous studies have shown, and early in this study it was confirmed, that a collider of approximately 20 TeV protons on 20 TeV protons with a luminosity of 10 33 cm -2 s -1 at each interaction region is needed to support a physics program that is guaranteed to answer existing particle physics questions and make new discoveries. Therefore, all options considered in this document were consistent with attainment of these original goals for the SSC. One promising option considered was a program of colliding anti-protons on protons as a possible means to reduce the cost of the SSC by eliminating one of the Collider rings. However, the luminosity requirements to obtain the SSC physics goals remains the same as for protons colliding with protons and this study confirms that even though progress has been made over the last ten years in obtaining the high intensity anti-proton beams necessary, a luminosity higher than 10 32 cannot be guaranteed. Other options were examined to see what advantages could be derived by departing from the SSC baseline program, either in schedule, in parameters, by staging, or by combinations of these options. Even though we considered re-examination of the cost of the baseline program to be beyond the scope of this document, differential cost savings were estimated. Finally, a brief survey of progress over the last ten years in various technical areas that might lead to more cost effective engineering designs was included in this study, such as higher magnetic field magnets resulting from lower operating temperatures or higher current-carrying superconducting materials

  9. Review of scientific and technical options for the Superconducting Super Collider Program

    Energy Technology Data Exchange (ETDEWEB)

    Dombeck, T.

    1993-11-01

    This document is a review of options for the Superconducting Super Collider (SSC) Program. It is the result of an informal study by an ad-hoc working group consisting of Laboratory physicists and engineers who investigated the physics and technical implications of a number of possible alternative SSC programs. Previous studies have shown, and early in this study it was confirmed, that a collider of approximately 20 TeV protons on 20 TeV protons with a luminosity of 10{sup 33} cm{sup {minus}2}s{sup {minus}1} at each interaction region is needed to support a physics program that is guaranteed to answer existing particle physics questions and make new discoveries. Therefore, all options considered in this document were consistent with attainment of these original goals for the SSC. One promising option considered was a program of colliding anti-protons on protons as a possible means to reduce the cost of the SSC by eliminating one of the Collider rings. However, the luminosity requirements to obtain the SSC physics goals remains the same as for protons colliding with protons and this study confirms that even though progress has been made over the last ten years in obtaining the high intensity anti-proton beams necessary, a luminosity higher than 10{sup 32} cannot be guaranteed. Other options were examined to see what advantages could be derived by departing from the SSC baseline program, either in schedule, in parameters, by staging, or by combinations of these options. Even though we considered re-examination of the cost of the baseline program to be beyond the scope of this document, differential cost savings were estimated. Finally, a brief survey of progress over the last ten years in various technical areas that might lead to more cost effective engineering designs was included in this study, such as higher magnetic field magnets resulting from lower operating temperatures or higher current-carrying superconducting materials.

  10. Status of feasibility study for various technical options of FBR systems

    International Nuclear Information System (INIS)

    Kani, Yoshio

    2000-01-01

    JNC (Japan Nuclear Cycle Development Institute) has started a new research project of feasibility studies (F/S) for a wide variety option of fast breeder reactor (FBR) and related fuel cycle in order to develop an economically competitive FBR cycle system fro commercialization. JNC and the electric untilities in Japan have established a new organization in JNC to perform the F/S since July 1, 1999. The organization has undertaken feasibility studies (F/S) in order to determine promising FBR cycle concepts and define necessary RandD tasks. The long-term targets of commercialized FBR cycle system are set as ensuring safety, economic competitiveness relative to future LWRs, efficient utilization of resources, reduction in environmental burden, and enhancement of nuclear non-proliferation. This paper describes the progress of design studies for a wide variety of technical options of FBR plants in the framework of the F/S. We make efforts towards considering all key issues so as not to fail to notice the best concept in a commercialized stage. In the study of technical options, the identified coolant types are sodium, heavy metal (lead and lead-bismuth), gas (carbon dioxide and helium ) and water (boiling water, pressurized water and supercritical water). The classified types of fuel are mixed oxide, nitride and metal. Design studies of small size modular plant concepts are also performed. We study many reactor concepts in combination with a coolant type and a fuel type, understand characteristics of each reactor concept based on our experience and an extensive survey of literature, and make a draft design of each reactor concept for rough estimation of construction costs. We also check how far the concept accomplishes each index (safety, economy, resource utilization, etc.) of design requirements, and will select several promising reactor concepts. (author)

  11. An investigation of dematerialization planning options at tourism destinations: Technical and behavioural dimensions

    OpenAIRE

    Kelly, Joseph

    2006-01-01

    The goal of this dissertation is to develop a conceptual framework and associated methods for evaluating alternative tourism planning strategies in terms of dematerialization and acceptability amongst tourists. Its objectives are to (1) examine the technical potential of dematerialization planning options in tourism destinations, (2) investigate tourist perspectives concerning destination planning alternatives that promote dematerialization, (3) assess the travel market responses and demateri...

  12. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  13. Republic of the Marshall Islands. Energy Project Development Options and Technical Assessment (2013)

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Misty Dawn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Olis, Dan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ness, J. Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Esterly, Sean [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    The advancement of renewable energy and energy efficient technologies continues to be fluid. There are many technical opportunities and strategies that can be utilized to guide communities to deploy cost-effective commercial alternative energy options; however, to achieve aggressive economic, environmental, and security goals, it requires a comprehensive, integrated approach. This document reports on the initial findings of an energy assessment that was conducted for the Republic of the Marshall Islands.

  14. Literature Survey on Technical Issues and Insights of Multi-Unit PSA

    International Nuclear Information System (INIS)

    Baek, Sejin; Park, Soyoung; Heo, Gyunyoung

    2016-01-01

    The need consider the risk impact in case of multi-unit in a single site increased after the accident at Fukushima Daiichi in March 2011. This means that we have to consider the single-unit initiators impacting the other units and the simultaneous accidents of the multi-unit on the same site. Particularly, this kind of technical concern is serious in case of the Republic of Korea where multi-units had to be located in high-density population area due to geographical features. The Nuclear Safety and Security Commission (NSSC) in the Republic of Korea has been trying to identify the state of the art of international and domestic regulations and techniques on multi-unit risk assessment and planning the road map for the safety researches. However, we have to say that finding a common accepted methodology along with safety criteria for multi-unit PSA was not an easy task up to now. This paper summarizes and analyzes related international and domestic journals' papers, conferences' papers and reports about the multi-unit PSA classifying categories with themes to understand the technical tendency of multi-unit PSA. In addition, some insights that were obtained from this classification have been arranged too. This paper investigated the technical trend of the multi-unit PSA as collecting of the international and domestic journals' papers, conferences papers and reports, and analyzing them. Upon the literature survey, a few statistics, technical issues, and insights were summarized. Both of the fundamental and practical researches need to find a globally accepted methodology to calculate and determine quantitative objectives for a multi-unit PSA. We want to expect that this paper can be shared to understand the current status of multi-unit PSA

  15. Literature Survey on Technical Issues and Insights of Multi-Unit PSA

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Sejin; Park, Soyoung; Heo, Gyunyoung [Kyung Hee Univ., Yongin (Korea, Republic of)

    2016-10-15

    The need consider the risk impact in case of multi-unit in a single site increased after the accident at Fukushima Daiichi in March 2011. This means that we have to consider the single-unit initiators impacting the other units and the simultaneous accidents of the multi-unit on the same site. Particularly, this kind of technical concern is serious in case of the Republic of Korea where multi-units had to be located in high-density population area due to geographical features. The Nuclear Safety and Security Commission (NSSC) in the Republic of Korea has been trying to identify the state of the art of international and domestic regulations and techniques on multi-unit risk assessment and planning the road map for the safety researches. However, we have to say that finding a common accepted methodology along with safety criteria for multi-unit PSA was not an easy task up to now. This paper summarizes and analyzes related international and domestic journals' papers, conferences' papers and reports about the multi-unit PSA classifying categories with themes to understand the technical tendency of multi-unit PSA. In addition, some insights that were obtained from this classification have been arranged too. This paper investigated the technical trend of the multi-unit PSA as collecting of the international and domestic journals' papers, conferences papers and reports, and analyzing them. Upon the literature survey, a few statistics, technical issues, and insights were summarized. Both of the fundamental and practical researches need to find a globally accepted methodology to calculate and determine quantitative objectives for a multi-unit PSA. We want to expect that this paper can be shared to understand the current status of multi-unit PSA.

  16. The cleanup of Three Mile Island Unit 2: A technical history, 1979--1990

    International Nuclear Information System (INIS)

    Holton, W.C.; Negin, C.A.; Owrutsky, S.L.

    1990-09-01

    The Electric Power Research Institute has sponsored a technical history project to ensure that the logic and consequences of decisions made during the Three Mile Island Unit 2 (TMI-2) cleanup are available for recovery from an accident involving damaged fuel and fission product release. The objectives of the history project are to identify the major questions and challenges facing management; describe the influencing factors and the options available; and present the final decisions and their consequences. This history of decision-making is intended to assist a project manager who must respond to a fuel damage accident, even if the scale is much smaller than TMI-2. The history has focused on decisions related to seven major aspects of the cleanup: cleanup management, postaccident stabilization, personnel protection, data acquisition, radioactive waste management, decontamination, and defueling. A detailed chronology and extensive bibliography accompany the text

  17. Audit of Wolf Creek Generating Station, Unit 1 technical specifications. Final technical evaluation report

    International Nuclear Information System (INIS)

    Stromberg, H.M.

    1985-07-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Wolf Creek Generating Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, the requirements of the Safety Evaluation Report (SER) as supplemented, and the Comments and Responses to the Wolf Creek Technical Specification Draft Inspection Report. A comparative audit of the FSAR as amended, the SER as supplemented, and the Draft Inspection Report was performed with the Wolf Creek T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Wolf Creek Generating Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR, SER, and Draft Inspection Report

  18. Western Option - Disarmament of Russian Weapon Plutonium

    International Nuclear Information System (INIS)

    Tveiten, B.; Petroll, M.R.

    2002-01-01

    The Western Option concept describes an approach to the conversion of weapon-grade plutonium from Russian nuclear warheads under the special aspects of meeting the criteria of irreversible utilization. Putting this concept of plutonium conversion into non-weapon-grade material into effect would make a major contribution to improving security worldwide. This study is based on an agreement between the Russian Federation and the United States of America concluded in September 2000. It provides for the conversion of 34 t of weapon-grade plutonium in each of the two states. This goal is also supported by other G8 countries. While the United States performs its part of the agreement under its sole national responsibility, the Russian program needs financial support by Western states. Expert groups have pointed out several options as a so-called basic scenario. The funds of approx. US Dollar 2 billion required to put them into effect have not so far been raised. The Western Option approach described in this contribution combines results of the basic scenario with other existing experience and with technical solutions available for plutonium conversion. One of the attractions of the Western Option lies in its financial advantages, which are estimated to amount to approx. US Dollar 1 billion. (orig.) [de

  19. Selection of Belt Conveyors Drive Units Number by Technical –Economical Analysis

    OpenAIRE

    Despodov, Zoran; Mijalkovski, Stojance; Adjiski, Vancho; Panov, Zoran

    2014-01-01

    In this paper is presented a methodology for selection of belt conveyor drive units number by technical - economical analysis of their parameters. Belt Conveyors with follow drive arrangement will be considered: one, two, three and four drive units. In the technical - economical analysis are including: Tension forces, Power of belt conveyor, Costs for belt, Costs for power and reducers, Total cost for belt conveyor system.

  20. Nonnative forest insects and pathogens in the United States: impacts and policy options

    Science.gov (United States)

    Gary M. Lovett; Marissa Weiss; Andrew M. Liebhold; Tom Holmes; Brian Leung; Kathy-Fallon Lambert; David A. Orwig; Faith T. Campbell; Jonathan Rosenthal; Deborah G. McCullough; Radka Wildova; Matthew P. Ayres; Charles D. Canham; David R. Foster; Shannon L. LaDeau; Troy Weldy

    2016-01-01

    We review and synthesize information on invasions of nonnative forest insects and diseases in the United States, including their ecological and economic impacts, pathways of arrival, distribution within the United States, and policy options for reducing future invasions. Nonnative insects have accumulated in United States forests at a rate of ~2.5 per yr over the last...

  1. OPTION OF USERS IN SURGICAL CONTRACEPTION FAMILY HEALTH UNIT

    Directory of Open Access Journals (Sweden)

    Vagner Ferreira do Nascimento

    2013-09-01

    Full Text Available The study is a descriptive and quantitative approach, which aimed to meet customers the option of surgical contraception by a Family Health Unit in the municipality of Barra do Herons - Mato Grosso. Data were collected on 22 forms of reference that would be forwarded to the sector and family planning counseling. Data were collected and grouped by age, marital status, gender, children and quantitative choice of surgical method of contraception. The period of data collection occurred from March to December 2011. The age group with the highest participation was from 18 to 25 years. Predominantly single, female, with two sons and opting for sterilization. The variety of options to be used as contraceptive methods should be widely publicized and encouraged by health professionals, leaving the surgical methods of reversible or irreversible disruption as a last choice.

  2. Organizational Design within University Extension Units: Some Concepts, Options, and Guidelines

    Science.gov (United States)

    Baker, Harold R.

    1976-01-01

    Drawing on the behavioral sciences, the author outlines alternative modes of structuring and organizing an extension unit. The advantages and disadvantages of several organizational design options, the purposes and management of the temporary task force, and some general guidelines for making organizational design decisions are discussed.…

  3. The future is yours--Get ready! Career options in scientific and technical fields. Revision

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    This 50 page brochure was developed by Brookhaven National Laboratory to encourage high school students to begin considering careers in the scientific and technical fields. The topics of the brochure include career selection, career options, a review of training required for each occupation, a collection of profiles of BNL employees describing how they chose and prepared for their careers, a description of BNL educational programs for high school students, and profiles of some of the students participating in these programs.

  4. A parametric approach for the valuation of power plant flexibility options

    Directory of Open Access Journals (Sweden)

    Julia Hentschel

    2016-11-01

    Full Text Available Conventional generation units encounter a changing role in modern societies’ energy supply. With increased need for flexible operation, engineers and project managers have to evaluate the benefits of technical improvements. For this purpose, a valuation tool has been developed, comparing economical cornerstones and technical constraints of generation units to European Energy Exchange prices for PHELIX 2014. It enables the user to relate a change in technical parameters to an economic effect and possible revenues. Four different types of conventional power plants are investigated in scenarios with increasing CO2 and fuel prices to determine the impact of different flexibility options. Results show that an increased ramp rate has not the same magnitude of positive economic impact as reduced minimum operation load, based on an observation on a price signal with resolution of fifteen minutes.

  5. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  6. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Science.gov (United States)

    2010-01-01

    ... on the remote afterloader unit, on the control console, and in the facility; (3) Viewing and intercom... 10 Energy 1 2010-01-01 2010-01-01 false Additional technical requirements for mobile remote... MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  7. Look at potential options for the fast reactor fuel cycle in the United States

    International Nuclear Information System (INIS)

    Burch, W.D.

    1984-01-01

    This paper reviews the status and plans for the fast reactor fuel cycle in the United States, presents some options that are under consideration, and describes how these options are being evaluated at the present time. The United States will undertake some far-reaching examinations of the entire breeder program strategy in the coming year, and the outcome of these reviews cannot be predicted today. In other papers at this conference you have heard various perspectives from both government and industry representatives. The proposed studies to examine the associated fuel cycle strategies as they relate to the overall emerging breeder strategy are described. The present status of and recent developments in the fuel cycle R and D programs will also be summarized and updated in order to present an overall picture of the United States situation

  8. A review of technical options for solar charging stations in Asia and Africa

    Directory of Open Access Journals (Sweden)

    R. H. Almeida

    2015-09-01

    Full Text Available Charging stations are an attractive solution to provide access to electricity to low income populations with low energy consumption in remote and off-grid areas. This paper reviews the state of the art of charging stations, with special focus on the technical options. Forty-five different actors in this field were analysed, based on academic publications, reports, online search and surveys. Results show that most stations are run in Sub Saharan Africa and South Asia, are powered by solar energy and although there are many different energy services targeted, the most popular services are charging batteries, mobile phones and lamps. The first charging station was installed in 1992 but most activities happen after 2005. This recent growth has been enabled by the falling cost of photovoltaic modules, learning effect, economies of scale, financial innovation, private sector involvement and worldwide dissemination of mobile phones. While in the first system the only purpose was to charge solar photovoltaic lanterns, the first multi-purpose station appeared in 2008. As expected, the technical challenges are mostly related to the use of batteries not only because they represent the component with shortest lifetime but also because if the battery is not for individual use, social questions arise due to poor definition of rights and duties of the customers. Furthermore, the development of a sustainable business model is also a challenge since this requires technical skills and system monitoring that are not usually available locally. Finally, it is also suggested that the minimum technical quality standards for charging stations should be defined and implemented.

  9. Impact of Medicare Advantage penetration and hospital competition on technical efficiency of nursing care in US intensive care units.

    Science.gov (United States)

    Min, Ari; Scott, Linda D; Park, Chang; Vincent, Catherine; Ryan, Catherine J; Lee, Taewha

    2018-04-10

    This study aimed to evaluate technical efficiency of US intensive care units and determine the effects of environmental factors on technical efficiency in providing quality of nursing care. Data were obtained from the 2014 National Database of Nursing Quality Indicators and the Centers for Medicare and Medicaid Services. Data envelopment analysis was used to estimate technical efficiency for each intensive care unit. Multilevel modeling was used to determine the effects of environmental factors on technical efficiency. Overall, Medicare Advantage penetration and hospital competition in a market did not create pressure for intensive care units to become more efficient by reducing their inputs. However, these 2 environmental factors showed positive influences on technical efficiency in intensive care units with certain levels of technical efficiency. The implications of the study results for management strategies and health policy may vary according to the levels of technical efficiency in intensive care units. Further studies are needed to examine why and how intensive care units with particular levels of technical efficiency are differently affected by certain environmental factors. Copyright © 2018 John Wiley & Sons, Ltd.

  10. Low activity resin processing and disposal options review

    International Nuclear Information System (INIS)

    Gardner, F.

    1996-01-01

    New processing options for low activity resin processing and disposal are available. This presentation reviews the economics and technical requirements associated with the following low activity resin processing options. (1) Bulk release resin. (2) Direct disposal. (3) Decontamination and bulk release of cleaned resin. New processing and disposal options have been developed during 1995. Commercial experience with each of these options will be reviewed and the economics associated with the processing method described in detail. Technical requirements for each option will be identified specifying the activity limits and operational requirements for implementation

  11. Fuel cycle options for light water reactors and heavy water reactors. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    1999-11-01

    In the second half of the 20th century nuclear power has evolved from the research and development environment to an industry that supplies 16% of the world's electricity. By the end of 1997, over 8500 reactor-years of operating experience had been accumulated. Global environmental change, and the continuing increase in global energy supply required to provide increasing populations with an improving standard of living, make the contribution from nuclear energy even more important for the next century. For nuclear power to achieve its full potential and make its needed contribution, it must be safe, economical, reliable and sustainable. All of these factors can be enhanced by judicious choice and development of advanced fuel cycle options. The Technical Committee Meeting (TCM) on Fuel Cycle Options for Light Water Reactors and Heavy Water Reactors was hosted by Atomic Energy of Canada Limited (AECL) on behalf of the Canadian Government and was jointly conducted within the frame of activities of the IAEA International Working Group on Advanced Technologies for Light Water Reactors (IWG-LWR) and the IAEA International Working Group on Advanced Technologies for Heavy Water Reactors (IWG-HWR). The TCM provided the opportunity to have in-depth discussions on important technical topics which were highlighted in the International Symposium on Nuclear Fuel Cycle and Reactor Strategies: Adjusting to New Realities, held in Vienna, 3-6 June 1997. The main results and conclusions of the TCM were presented as input for discussion at the first meeting of the IAEA newly formed International Working Group on Fuel Cycle Options

  12. Options Study - Phase II

    Energy Technology Data Exchange (ETDEWEB)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2010-09-01

    The Options Study has been conducted for the purpose of evaluating the potential of alternative integrated nuclear fuel cycle options to favorably address the issues associated with a continuing or expanding use of nuclear power in the United States. The study produced information that can be used to inform decisions identifying potential directions for research and development on such fuel cycle options. An integrated nuclear fuel cycle option is defined in this study as including all aspects of the entire nuclear fuel cycle, from obtaining natural resources for fuel to the ultimate disposal of used nuclear fuel (UNF) or radioactive wastes. Issues such as nuclear waste management, especially the increasing inventory of used nuclear fuel, the current uncertainty about used fuel disposal, and the risk of nuclear weapons proliferation have contributed to the reluctance to expand the use of nuclear power, even though it is recognized that nuclear power is a safe and reliable method of producing electricity. In this Options Study, current, evolutionary, and revolutionary nuclear energy options were all considered, including the use of uranium and thorium, and both once-through and recycle approaches. Available information has been collected and reviewed in order to evaluate the ability of an option to clearly address the challenges associated with the current implementation and potential expansion of commercial nuclear power in the United States. This Options Study is a comprehensive consideration and review of fuel cycle and technology options, including those for disposal, and is not constrained by any limitations that may be imposed by economics, technical maturity, past policy, or speculated future conditions. This Phase II report is intended to be used in conjunction with the Phase I report, and much information in that report is not repeated here, although some information has been updated to reflect recent developments. The focus in this Options Study was to

  13. Options For The Disposition Of UK Civil Plutonium Stocks

    Energy Technology Data Exchange (ETDEWEB)

    Moore, R.G.; Zimmerman, C.H.; Scales, C.; Worrall, A.; Sims, H.E.; Fowler, L. [Nexia Solutions Ltd (United Kingdom)

    2008-07-01

    The UK Civil Pu Disposition project will identify and assess the viability of several technical options for dealing with the UK's civil separated Pu stockpile and the discriminators that will support technology option down-selection decisions. The overall aim will be to deliver feasible technical options and comprehensive information on political, economic, sociological, environmental and technical factors for each strategic option. This paper briefly describes the work completed to date to assess immobilisation and re-use technologies as disposition strategies and on the work that will identify discriminators to support technology down-selection. The Pu disposition project is anticipated to continue for several years while the necessary investigations are made to fully understand the various options. The work planned over this period is discussed. (authors)

  14. Options For The Disposition Of UK Civil Plutonium Stocks

    International Nuclear Information System (INIS)

    Moore, R.G.; Zimmerman, C.H.; Scales, C.; Worrall, A.; Sims, H.E.; Fowler, L.

    2008-01-01

    The UK Civil Pu Disposition project will identify and assess the viability of several technical options for dealing with the UK's civil separated Pu stockpile and the discriminators that will support technology option down-selection decisions. The overall aim will be to deliver feasible technical options and comprehensive information on political, economic, sociological, environmental and technical factors for each strategic option. This paper briefly describes the work completed to date to assess immobilisation and re-use technologies as disposition strategies and on the work that will identify discriminators to support technology down-selection. The Pu disposition project is anticipated to continue for several years while the necessary investigations are made to fully understand the various options. The work planned over this period is discussed. (authors)

  15. Safety options for the 1300 MWe program

    International Nuclear Information System (INIS)

    Cayol, A.; Dupuis, M.C.; Fourest, B.; Oury, J.M.

    1980-04-01

    Standardization of the nuclear plants built in France implies an examination of the main technical safety options to be taken for a given type of reactor. By this procedure the subjects for which detailed studies will be needed to confirm the decisions made for the project can be defined in advance. In this context the technical safety option analysis for the 1300 MWe plants was conducted from the end of 1975 to the middle of 1978 according to usual regulation examination practice. The main conclusions are presented on the following subjects: safety methods; technical options concerning the containment vessel, primary fluid activity, fuel elements, steam generators; general organization of the lay-out [fr

  16. Evaluation of a TRU fundamental criterion and reference TRU waste units

    International Nuclear Information System (INIS)

    Klett, R.

    1993-01-01

    The comparison of two options for regulating transuranic (TRU) waste disposal is explained in this paper. The two options are (1) fundamental and derived standards developed specifically for the TRU waste and (2) a family of procedures that use a reference to the TRU waste unit with procedures that use a reference to the TRU waste unit with commercial high-level waste (HLW) criteria. Background information pertaining to both options is covered. A section on criteria specifically for TRUE waste suggests a methodology for developing or adapting fundamental and derived criteria that are consistent with all other aspects of the standards. The section on references TRU waste units covers all the parameter variations that have been suggested for this option. The technical bases of each approach is reviewed, implementation is discussed and their relative attributes and deficiencies are evaluated

  17. 78 FR 27963 - Reliability Technical Conference; Notice of Technical Conference

    Science.gov (United States)

    2013-05-13

    ... Technical Conference; Notice of Technical Conference Take notice that the Federal Energy Regulatory Commission will hold a Technical Conference on Tuesday, July 9, 2013 from 9:00 a.m. to 5:00 p.m. This... technical support for webcasts and offers the option of listening to the meeting via phone-bridge for a fee...

  18. K Basin spent fuel sludge treatment alternatives study. Volume 2, Technical options

    International Nuclear Information System (INIS)

    Beary, M.M.; Honekemp, J.R.; Winters, N.

    1995-01-01

    Approximately 2100 metric tons of irradiated N Reactor fuel are stored in the KE and KW Basins at the Hanford Site, Richland, Washington. Corrosion of the fuel has led to the formation of sludges, both within the storage canisters and on the basin floors. Concern about the degraded condition of the fuel and the potential for leakage from the basins in proximity to the Columbia River has resulted in DOE's commitment in the Tri-Party Agreement (TPA) to Milestone M-34-00-T08 to remove the fuel and sludges by a December 2002 target date. To support the planning for this expedited removal action, the implications of sludge management under various scenarios are examined. This report, Volume 2 of two volumes, describes the technical options for managing the sludges, including schedule and cost impacts, and assesses strategies for establishing a preferred path

  19. DISPOWER. A socio-economic analysis of technical solutions and practices for the integration of distributed generation

    International Nuclear Information System (INIS)

    Ten Donkelaar, M.; Scheepers, M.J.J.

    2004-07-01

    Socio-economic impacts of technical solutions and approaches that are being developed for the integration of distributed generation (DG) in electricity distribution systems are analyzed. For this analysis an inventory was made of technical options, solutions and approaches on the basis of a questionnaire that has been distributed among DG (technical) experts. The questionnaire was not meant to give an exhaustive overview, but to gain insight in the possible technical solutions, options and approaches and the economic interactions between different actors in the electricity market. The different technical options and solutions have been divided into four main categories. Four technologies, one of each category, have been studied in more detail to analyse their impact on the financial relationships between the actors in the distribution network. The four technologies are: wind power prediction tool (planning tool), grid control unit (power quality device), power operation and power quality management system (ICT device), and power storage device. To assess the impact of the investments in the proposed technologies on all actors involved (and different from the actor investing), an assessment tool has been developed to qualitatively identify the economic impacts of a number of these options. This assessment tool takes into account the financial transactions between the parties on the distribution network. The analysis also discusses the allocation of the economic value of certain benefits through contracts and economic network regulation

  20. K Basin spent fuel sludge treatment alternatives study. Volume 2, Technical options

    Energy Technology Data Exchange (ETDEWEB)

    Beary, M.M.; Honekemp, J.R.; Winters, N. [Science Applications International Corp., Richland, WA (United States)

    1995-01-01

    Approximately 2100 metric tons of irradiated N Reactor fuel are stored in the KE and KW Basins at the Hanford Site, Richland, Washington. Corrosion of the fuel has led to the formation of sludges, both within the storage canisters and on the basin floors. Concern about the degraded condition of the fuel and the potential for leakage from the basins in proximity to the Columbia River has resulted in DOE`s commitment in the Tri-Party Agreement (TPA) to Milestone M-34-00-T08 to remove the fuel and sludges by a December 2002 target date. To support the planning for this expedited removal action, the implications of sludge management under various scenarios are examined. This report, Volume 2 of two volumes, describes the technical options for managing the sludges, including schedule and cost impacts, and assesses strategies for establishing a preferred path.

  1. A Review of Technical Communication Programs Outside the United States.

    Science.gov (United States)

    Alred, Gerald J.

    2001-01-01

    Examines technical communication programs outside the United States and comments on such features as their location in the university structure, links with public relations, the inclusion of internships or practicums, the balance of theory and practice, and typical course offerings. Lists a dozen major programs in seven countries. Concludes that…

  2. Benefit/cost analysis of plutonium recycle options in the United States of America

    International Nuclear Information System (INIS)

    Lowenberg, H.; Burnham, J.B.; Fisher, F.D.; Ray, W.H.

    1977-01-01

    Beginning in 1973, the USAEC started the analysis of the benefit/cost balance of Pu recycling in light-water reactors and the US Nuclear Regulatory Commission has continued this effort to the present time. A study of the United States nuclear industry from 1975 until 2000 was summarized in a final environmental statement called GESMO - Generic Environmental Statement on Mixed Oxide, NUREG-0002. Cumulative environmental and economic effects for several industry growth patterns were determined. Five alternatives were evaluated, covering the basic options of recycling uranium and plutonium; recycling uranium; and no recycling. The NRC findings, excluding consideration of proliferation and safeguards questions, are: the safety of reactors and fuel-cycle facilities are not significantly affected by recycle; excluding consideration of radiological effects, the environmental effects of recycle are slightly less than those from a non-recycle system; plutonium recycling extends uranium resources and reduces environmental impacts at the same time requiring reprocessing and Pu-handling facilities; despite uncertainties, recycling has probable economic advantages over other fuel concepts; differences in health effects attributable to recycling provide no basis for selecting a particular fuel-cycle option; no waste-management considerations appear that could be a basis for the selection of any particular option. The NRC studies on health, safety and environmental considerations of Pu recycling in the United States of America show that the differences in benefits/costs between the alternative fuel cycles are small and hence do not provide a clear basis for a decision on Pu recycle at this time. Safeguards and international proliferation implications appear to be the controlling factors in reaching a decision. President Carter's statement indefinitely deferring reprocessing and Pu recycle in the United States of America has resulted in a re-evaluation by NRC of its programme to

  3. Technical specifications: Seabrook Station, Unit 1 (Docket No. 50-443)

    International Nuclear Information System (INIS)

    1990-03-01

    The Seabrook Station, Unit 1 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  4. Retrieval options study

    International Nuclear Information System (INIS)

    1980-03-01

    This Retrieval Options Study is part of the systems analysis activities of the Office of Nuclear Waste Isolation to develop the scientific and technological bases for radioactive waste repositories in various geologic media. The study considers two waste forms, high level waste and spent fuel, and defines various classes of waste retrieval and recovery. A methodology and data base are developed which allow the relative evaluation of retrieval and recovery costs and the following technical criteria: safety; technical feasibility; ease of retrieval; probable intact retrieval time; safeguards; monitoring; criticality; and licensability. A total of 505 repository options are defined and the cost and technical criteria evaluated utilizing a combination of facts and engineering judgments. The repositories evaluated are selected combinations of the following parameters: Geologic Media (salt, granite, basalt, shale); Retrieval Time after Emplacement (5 and 25 years); Emplacement Design (nominal hole, large hole, carbon steel canister, corrosion resistant canister, backfill in hole, nominal sleeves, thick wall sleeves); Emplacement Configuration (single vertical, multiple vertical, single horizontal, multiple horizontal, vaults; Thermal Considerations; (normal design, reduced density, once-through ventilation, recirculated ventilation); Room Backfill; (none, run-of-mine, early, 5 year delay, 25 year delay, decommissioned); and Rate of Retrieval;

  5. Optimization models of the supply of power structures’ organizational units with centralized procurement

    Directory of Open Access Journals (Sweden)

    Sysoiev Volodymyr

    2013-01-01

    Full Text Available Management of the state power structures’ organizational units for materiel and technical support requires the use of effective tools for supporting decisions, due to the complexity, interdependence, and dynamism of supply in the market economy. The corporate nature of power structures is of particular interest to centralized procurement management, as it provides significant advantages through coordination, eliminating duplication, and economy of scale. This article presents optimization models of the supply of state power structures’ organizational units with centralized procurement, for different levels of simulated materiel and technical support processes. The models allow us to find the most profitable options for state power structures’ organizational supply units in a centre-oriented logistics system in conditions of the changing needs, volume of allocated funds, and logistics costs that accompany the process of supply, by maximizing the provision level of organizational units with necessary material and technical resources for the entire planning period of supply by minimizing the total logistical costs, taking into account the diverse nature and the different priorities of organizational units and material and technical resources.

  6. Evaluation of River Bend Station Unit 1 Technical Specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the River Bend Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the River Bend T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The River Bend Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  7. Reasons that lead mothers looking for a pre-hospital unit as a first option for attendance - Sorocaba/SP

    Directory of Open Access Journals (Sweden)

    Thais Helena Campos

    2015-06-01

    Full Text Available Objective: to verify the reasons lead mothers to seek the Pre- hospital Unit of Sorocaba Western Zone (UPH-ZO as first option of attendance and quantify the inappropriate motives for this search. Method: it is an exploratory study with quantitative analyze performed at UPH-ZO through the emergence bulletin (BE and the mothers or guardians interview. Results: nine hundred mothers and guardians were interviewed. Four reasons prevailed as motivation for search the UPH-ZO by first option: better and quick resolution with technological resources provided; restrict period for attendance at the Basic Health Unit (UBS; delay for appointment in the UBS; lack of Pediatrician in this Unit. The prevalent diagnostic hypothesis in the sample was acute gastroenterocolitis and superior aerial way infections. Conclusions: for the 68.8% of the sample the looking for UPH-ZO was adequate; 31.2% referred reasons that could be solved at the UBS. This Unit must just be the entrance for the users of the Health Unique System (SUS.

  8. Alternative energy options

    International Nuclear Information System (INIS)

    Bennett, K.F.

    1983-01-01

    It is accepted that coal will continue to play the major role in the supply of energy to the country for the remainder of the century. In this paper, however, emphasis has been directed to those options which could supplement coal in an economic and technically sound manner. The general conclusion is that certain forms of solar energy hold the most promise and it is in this direction that research, development and implementation programmes should be directed. Tidal energy, fusion energy, geothermal energy, hydrogen energy and fuel cells are also discussed as alternative energy options

  9. Radiological Effluent Technical Specifications (RETS) implementation: Zion Generating Station Units 1 and 2

    International Nuclear Information System (INIS)

    Serrano, W.; Akers, D.W.; Duce, S.W.; Mandler, J.W.; Simpson, F.B.; Young, T.E.

    1985-06-01

    A review of the Radiological Effluent Technical Specifications (RETS) of the Zion Generating Station Units 1 and 2 was performed. The principal review guidelines used were NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants,'' and Draft 7 of NUREG-0472, Revision 3, ''Radiological Effluent Technical Specifications for Pressurized Water Reactors.'' Draft submittals were discussed with the Licensee by both EG and G and the NRC staff until all items requiring changes to the Technical Specifications were resolved. The Licensee then submitted final proposed RETS to the NRC which were evaluated and found to be in compliance with the NRC review guidelines. The proposed Offsite Dose Calculation Manual was reviewed and generally found to be consistent with the NRC review guidelines. 35 refs., 2 figs., 1 tab

  10. Completion of Population of and Quality Assurance on the Nuclear Fuel Cycle Options Catalog.

    Energy Technology Data Exchange (ETDEWEB)

    Price, Laura L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barela, Amanda Crystal [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Walkow, Walter M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schetnan, Richard Reed [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Arnold, Matthew Brian [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    An Evaluation and Screening team supporting the Fuel Cycle Technologies Program Office of the United States Department of Energy, Office of Nuclear Energy is conducting an evaluation and screening of a comprehensive set of fuel cycle options. These options have been assigned to one of 40 evaluation groups, each of which has a representative fuel cycle option [Todosow 2013]. A Fuel Cycle Data Package System Datasheet has been prepared for each representative fuel cycle option to ensure that the technical information used in the evaluation is high-quality and traceable [Kim, et al., 2013]. The information contained in the Fuel Cycle Data Packages has been entered into the Nuclear Fuel Cycle Options Catalog at Sandia National Laboratories so that it is accessible by the evaluation and screening team and other interested parties. In addition, an independent team at Savannah River National Laboratory has verified that the information has been entered into the catalog correctly. This report documents that the 40 representative fuel cycle options have been entered into the Catalog, and that the data entered into the catalog for the 40 representative options has been entered correctly.

  11. OIL AND GAS FUTURES AND OPTIONS MARKET

    Directory of Open Access Journals (Sweden)

    Ante Nosić

    2017-01-01

    Full Text Available Energy mineral resources markets are represented by complex supply and demand ratios which are depending on different factors such as technical (transport and geopolitical. The main specific of energy markets is represented by an uneven geographic distribution of hydrocarbon reserves and exploration on one hand and energy consumption on the other. World oil markets, although geographically localized, because of specific market trade, represent unique global market with decreasing price difference. Price differences are result of development of a transport possibilities of oil supply. Development of transport routes of natural gas and increasing number of liquefied natural gas terminals in the world give pressure to natural gas market and its integration into global gas market. Integration of regional gas markets into a common European gas market is main energy policy of EU concerning natural gas. On the other hand, there are still significant price differences on some markets (e.g. United States of America - South East Asia. Development of global energy markets is enabled by development of a futures and options contracts of an energy trade which have replaced bilateral contract deals between producers and consumers. Futures contracts are standardized contracts traded on exchanges. Buyer agrees to buy certain quantity of stock for an agreed upon price and with some future delivery date. Option is a contract which gives a buyer the option of the right to buy (or sell, depending on the option an asset at predetermined price and at a later date. Stocks price risk can be managed with the purchase and selling futures and options contracts. This paper deals with futures and options energy markets and their market strategies.

  12. Security option file - Exploitation (DOS-Expl)

    International Nuclear Information System (INIS)

    2016-01-01

    This document aims at presenting functions performed by Cigeo during its exploitation phase, its main technical and security options which are envisaged with respect to different types of internal or external risks, and a first assessment of its impact on mankind and on the environment during its exploitation in normal operation as well as in incidental or accidental situations. A first volume addresses security principles, approach and management in relationship with the legal and regulatory framework. The second volume presents input data related to waste parcels and used for the installation sizing and operation, the main site characteristics, the main technical options regarding structures and equipment, and the main options regarding exploitation (parcel management, organisational and human aspects, and effluent management). The third volume describes how parcel are processed from their arrival to their setting in storage compartment, an inventory of internal and external risks, and a first assessment of consequences of scenarios on mankind and on the environment. The fourth volume presents options and operations which are envisaged regarding Cigeo closure, and inventory of associated risks

  13. Retrieval options study

    Energy Technology Data Exchange (ETDEWEB)

    1980-03-01

    This Retrieval Options Study is part of the systems analysis activities of the Office of Nuclear Waste Isolation to develop the scientific and technological bases for radioactive waste repositories in various geologic media. The study considers two waste forms, high level waste and spent fuel, and defines various classes of waste retrieval and recovery. A methodology and data base are developed which allow the relative evaluation of retrieval and recovery costs and the following technical criteria: safety; technical feasibility; ease of retrieval; probable intact retrieval time; safeguards; monitoring; criticality; and licensability. A total of 505 repository options are defined and the cost and technical criteria evaluated utilizing a combination of facts and engineering judgments. The repositories evaluated are selected combinations of the following parameters: Geologic Media (salt, granite, basalt, shale); Retrieval Time after Emplacement (5 and 25 years); Emplacement Design (nominal hole, large hole, carbon steel canister, corrosion resistant canister, backfill in hole, nominal sleeves, thick wall sleeves); Emplacement Configuration (single vertical, multiple vertical, single horizontal, multiple horizontal, vaults; Thermal Considerations; (normal design, reduced density, once-through ventilation, recirculated ventilation); Room Backfill; (none, run-of-mine, early, 5 year delay, 25 year delay, decommissioned); and Rate of Retrieval; (same as emplacement, variably slower depending on repository/canister condition).

  14. Option pricing with COS method on Graphics Processing Units

    NARCIS (Netherlands)

    B. Zhang (Bo); C.W. Oosterlee (Kees)

    2009-01-01

    htmlabstractIn this paper, acceleration on the GPU for option pricing by the COS method is demonstrated. In particular, both European and Bermudan options will be discussed in detail. For Bermudan options, we consider both the Black-Scholes model and Levy processes of infinite activity. Moreover,

  15. 40 CFR 75.19 - Optional SO2, NOX, and CO2 emissions calculation for low mass emissions (LME) units.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Optional SO2, NOX, and CO2 emissions... § 75.19 Optional SO2, NOX, and CO2 emissions calculation for low mass emissions (LME) units. (a... input, NOX, SO2, and CO2 mass emissions, and NOX emission rate under this part. If the owner or operator...

  16. Technical evaluation report on the proposed design modifications and technical-specification changes on grid voltage degradation for the San Onofre Nuclear Genetating Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the San Onofre Nuclear Generating Station, Unit 1. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation finds that the proposed design modifications and Technical Specification changes will ensure that the Class 1E equipment will be protected from sustained voltage degradation

  17. Evaluation of Watts Bar Nuclear Plant Unit 1 Technical Specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Watts Bar Nuclear Plant Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumption of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Watts Bar T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Watts Bar Nuclear Plant Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  18. Evaluation of Shoreham Nuclear Power Station, Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-08-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Shoreham Nuclear Power Station Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the assumptions of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Shoreham T/S. Several discrepancies were identified and subsequently resolved through discussions with the cognizant NRC reviewer, NRC staff reviewers and/or utility representatives. The Shoreham Nuclear Power Station Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  19. Evaluation of Waterford Steam Electric Station Unit 3 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-09-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Waterford Steam Electric Station Unit 3 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Waterford T/S. Several discrepancies were identified and subsequently resolved by the cognizant NRC reviewer. Pending completion of the resolutions noted in Part 3 of this report, the Waterford Steam Electric Station Unit 3 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  20. Slowing global warming biotically - Options for the United States

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Each of the five biotic approaches introduced in Chapter 2 is applicable to some extent in the US. Taking US land-use characteristics into account, a menu of policy options tailored to US carbon storage opportunities is presented. Several of the options are capable of significantly reducing net US carbon emissions; several offer corollary benefits in areas other than global warming mitigation. The time frame and costs of the different options vary widely, although in most cases some level of implementation appears economically justified even without considering global warming. The approach, projected costs, and advantages of seven different policy options are profiled

  1. Technical options for the remediation of contaminated groundwater

    Energy Technology Data Exchange (ETDEWEB)

    1999-06-01

    This report provides a description of the nature and extent of problems related to radioactive groundwater contamination by outlining the environmental impacts, the sources of contamination and the contaminants of concern radionuclides and their associated contaminants - the main exposure pathways and transport processes and the assessment of risks associated with contaminated groundwater. The main emphasis of this report is on methodologies used in groundwater remediation and available technologies. The methodology section outlines the importance of an initial scoping analysis including the evaluation of uncertainties of the available data and the necessity for defining clear objectives for data collection. This is then followed by comprehensive site characterization, setting of goals and developing alternatives which will be analysed in detail. Available technologies are grouped generally into in situ methods aiming at a containment of the contaminants in place and engineered treatment methods involving an alteration of groundwater flow, quantity and/or quality to achieve compliance with set goals. Groundwater remediation by natural flushing allows the natural groundwater movement and geochemical processes to decrease the contaminant concentrations to acceptable levels over a specified period of time. This method is increasingly accepted in areas where the use of groundwater can be temporarily restricted or engineered cleanup methods do not offer particular advantage over the natural processes. The application of technological methods for remediating contaminated groundwaters has to be considered in conjunction with management options such as diversion and development of alternative water sources. The experience with groundwater contamination accrued in IAEA Member States is concentrated in those countries with active uranium mining and milling facilities and nuclear energy programmes. This experience is reported in the Annexes, which include case studies. It

  2. Technical options for the remediation of contaminated groundwater

    International Nuclear Information System (INIS)

    1999-06-01

    This report provides a description of the nature and extent of problems related to radioactive groundwater contamination by outlining the environmental impacts, the sources of contamination and the contaminants of concern radionuclides and their associated contaminants - the main exposure pathways and transport processes and the assessment of risks associated with contaminated groundwater. The main emphasis of this report is on methodologies used in groundwater remediation and available technologies. The methodology section outlines the importance of an initial scoping analysis including the evaluation of uncertainties of the available data and the necessity for defining clear objectives for data collection. This is then followed by comprehensive site characterization, setting of goals and developing alternatives which will be analysed in detail. Available technologies are grouped generally into in situ methods aiming at a containment of the contaminants in place and engineered treatment methods involving an alteration of groundwater flow, quantity and/or quality to achieve compliance with set goals. Groundwater remediation by natural flushing allows the natural groundwater movement and geochemical processes to decrease the contaminant concentrations to acceptable levels over a specified period of time. This method is increasingly accepted in areas where the use of groundwater can be temporarily restricted or engineered cleanup methods do not offer particular advantage over the natural processes. The application of technological methods for remediating contaminated groundwaters has to be considered in conjunction with management options such as diversion and development of alternative water sources. The experience with groundwater contamination accrued in IAEA Member States is concentrated in those countries with active uranium mining and milling facilities and nuclear energy programmes. This experience is reported in the Annexes, which include case studies. It

  3. Beowawe Bottoming Binary Unit - Final Technical Report for EE0002856

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, Dale Edward

    2013-02-12

    This binary plant is the first high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a butane based cycle are not necessary. The unit is modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. This project proves the technical feasibility of using low temperature brine The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy for Nevada, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

  4. Technical Specifications, Limerick Generating Station, Unit No. 2 (Docket No. 50-353)

    International Nuclear Information System (INIS)

    1989-08-01

    The Limerick, Unit 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  5. Technical specifications, Limerick Generating Station, Unit No. 2 (Docket No. 50-353)

    International Nuclear Information System (INIS)

    1989-07-01

    The Limerick, Unit 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  6. Software for automated evaluation of technical and economic performance factors of nuclear power plant units

    International Nuclear Information System (INIS)

    Cvan, M.; Zadrazil, J.; Barnak, M.

    1989-01-01

    Computer codes TEP V2, TEP EDU and TEP V1 are used especially in real-time evaluation of technical and economic performance factors of the power unit. Their basic functions include filtration of credibility of input data obtained by measurement, simultaneous calculation of flows of various types of energy, calculation of technical and economic factors, listings and filing of the results. Code ZMEK is designed for executing changes in the calculation constants file for codes TEP V2 and TEP EDU. Code TEP DEN is used in processing the complete daily report on the technical and economic performance factors of the unit. Briefly described are the basic algorithms of credibility filtration for the measured quantities, the methodology of fundamental balances and the method of guaranteeing the continuity of measurement. Experiences are given with the use of the codes, and the trends are outlined of their future development. (J.B.). 5 refs

  7. Methodology for technical risk assessment

    International Nuclear Information System (INIS)

    Waganer, L.M.; Zuckerman, D.S.

    1983-01-01

    A methodology has been developed for and applied to the assessment of the technical risks associated with an evolving technology. This methodology, originally developed for fusion by K. W. Billman and F. R. Scott at EPRI, has been applied to assess the technical risk of a fuel system for a fusion reactor. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications (i.e. probability of failure). The individual steps in the technical risk assessment are summarized. The first step in this methodology is to clearly and completely quantify the technical requirements for the particular system being examined. The next step is to identify and define subsystems and various options which appear capable of achieving the required technical performance. The subsystem options are then characterized regarding subsystem functions, interface requirements with the subsystems and systems, important components, developmental obstacles and technical limitations. Key technical subsystem performance parameters are identified which directly or indirectly relate to the system technical specifications. Past, existing and future technical performance data from subsystem experts are obtained by using a Bayesian Interrogation technique. The input data is solicited in the form of probability functions. Thus the output performance of the system is expressed as probability functions

  8. 38 CFR 6.10 - Options.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Options. 6.10 Section 6.10 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS UNITED STATES GOVERNMENT LIFE INSURANCE Optional Settlement § 6.10 Options. Insurance will be payable in one sum only when...

  9. Assessment of the technical viability of reactor options for plutonium disposition

    International Nuclear Information System (INIS)

    Primm, R.T. III.

    1996-01-01

    Various reactor concepts for the disposition of surplus Pu have been proposed by reactor vendors; not all have attained the same level of technical viability. Studies were performed to differentiate between reactor concepts by devising a quantitative index for technical viability. For a quantitative assessment, three issues required resolution: the definition of a technical maturity scale, the treatment of ''subjective'' factors which cannot be easily represented in a quantitative format, and the protocol for producing a single technical viability figure-of-merit for each alternative. Alternatives involving the use of foreign facilities were found to be the most technically viable

  10. Evaluation of Perry Nuclear Power Plant Unit 1 technical specifications

    International Nuclear Information System (INIS)

    Baxter, D.E.; Bruske, S.J.

    1985-11-01

    This document was prepared for the Nuclear Regulatory Commission (NRC) to assist them in determining whether the Perry Nuclear Power Plant Unit 1 Technical Specifications (T/S), which govern plant systems configurations and operations, are in conformance with the requirements of the Final Safety Analysis Report (FSAR) as amended, and the requirements of the Safety Evaluation Report (SER) as supplemented. A comparative audit of the FSAR as amended, and the SER as supplemented was performed with the Perry T/S. Several discrepancies were identified and subsequently resolved through telephone conversations with the staff reviewer and the utility representative. Pending completion of the resolutions noted in Parts 3 and 4 of this report, the Perry Nuclear Power Plant Unit 1 T/S, to the extent reviewed, are in conformance with the FSAR and SER

  11. Rooftop Solar Photovoltaic Technical Potential in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Gagnon, Pieter; Margolis, Robert; Melius, Jennifer; Phillips, Caleb; Elmore, Ryan

    2016-01-01

    How much energy could we generate if PV modules were installed on all of the suitable roof area in the nation? To answer this question, we first use GIS methods to process a lidar dataset and determine the amount of roof area that is suitable for PV deployment in 128 cities nationwide, containing 23% of U.S. buildings, and provide PV-generation results for a subset of those cities. We then extend the insights from that analysis to the entire continental United States. We develop two statistical models -- one for small buildings and one for medium and large buildings -- and populate them with geographic variables that correlate with rooftop's suitability for PV. We simulate the productivity of PV installed on the suitable roof area, and present the technical potential of PV on both small buildings and medium/large buildings for every state in the continental US. Within the 128 cities covered by lidar data, 83% of small buildings have a location suitable for a PV installation, but only 26% of the total rooftop area of small buildings is suitable for development. The sheer number of buildings in this class, however, gives small buildings the greatest technical potential. Small building rooftops could accommodate 731 GW of PV capacity and generate 926 TWh/year of PV energy, approximately 65% of rooftop PV's total technical potential. We conclude by summing the PV-generation results for all building sizes and therefore answering our original question, estimating that the total national technical potential of rooftop PV is 1,118 GW of installed capacity and 1,432 TWh of annual energy generation. This equates to 39% of total national electric-sector sales.

  12. Design Evolution Study - Aging Options

    International Nuclear Information System (INIS)

    McDaniel, P.

    2002-01-01

    The purpose of this study is to identify options and issues for aging commercial spent nuclear fuel received for disposal at the Yucca Mountain Mined Geologic Repository. Some early shipments of commercial spent nuclear fuel to the repository may be received with high-heat-output (younger) fuel assemblies that will need to be managed to meet thermal goals for emplacement. The capability to age as much as 40,000 metric tons of heavy metal of commercial spent nuclear he1 would provide more flexibility in the design to manage this younger fuel and to decouple waste receipt and waste emplacement. The following potential aging location options are evaluated: (1) Surface aging at four locations near the North Portal; (2) Subsurface aging in the permanent emplacement drifts; and (3) Subsurface aging in a new subsurface area. The following aging container options are evaluated: (1) Complete Waste Package; (2) Stainless Steel inner liner of the waste package; (3) Dual Purpose Canisters; (4) Multi-Purpose Canisters; and (5) New disposable canister for uncanistered commercial spent nuclear fuel. Each option is compared to a ''Base Case,'' which is the expected normal waste packaging process without aging. A Value Engineering approach is used to score each option against nine technical criteria and rank the options. Open issues with each of the options and suggested future actions are also presented. Costs for aging containers and aging locations are evaluated separately. Capital costs are developed for direct costs and distributable field costs. To the extent practical, unit costs are presented. Indirect costs, operating costs, and total system life cycle costs will be evaluated outside of this study. Three recommendations for aging commercial spent nuclear fuel--subsurface, surface, and combined surface and subsurface are presented for further review in the overall design re-evaluation effort. Options that were evaluated but not recommended are: subsurface aging in a new

  13. Technical evaluation report on the proposed amendment to the technical specifications on the reactor protection system and the engineered safety features actuation system for Ft. Calhoun, Unit No. 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the application to amend the Technical Specifications for the Ft. Calhoun Unit No. 1 Nuclear Generating Plant. The review criteria are based on the Technical Specifications of St. Lucie and Calvert Cliffs, IEEE Standards, Combustion Engineering Standard Technical Specifications, and the Code of Federal Regulations. The evaluation compares the submittal made by the licensee with the NRC staff position and the review criteria and presents the reviewer's conclusion on the acceptability of the application to amend the Technical Specifications

  14. Buridan's Ass and a Menu of Options.

    OpenAIRE

    Svetlana Boyarchenko

    2005-01-01

    The goal of the paper is to study how a menu of options affects decisions of a rational agent facing uncertainty over future payoff streams. Using the real options approach, we demonstrate that multiple options not only increase the barrier which the underlying stochastic variable has to reach in order investment became optimal, but cause the investor to be inactive even when the cost of investment is vanishing. As a technical contribution, the paper suggests a robust method of solution of a ...

  15. Economic Screening of Geologic Sequestration Options in the United States with a Carbon Management Geographic Information System

    Energy Technology Data Exchange (ETDEWEB)

    Dahowski, Robert T.(BATTELLE (PACIFIC NW LAB)); Dooley, James J.(BATTELLE (PACIFIC NW LAB)); Brown, Daryl R.(BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Badie I. Morsi

    2001-10-19

    Developing a carbon management strategy is a formidable task for nations as well as individual companies. It is often difficult to understand what options are available, let alone determine which may be optimal. In response to the need for a better understanding of complex carbon management options, Battelle has developed a state-of-the-art Geographic Information System (GIS) model with economic screening capability focused on carbon capture and geologic sequestration opportunities in the United States. This paper describes the development of this GIS-based economic screening model and demonstrates its use for carbon management analysis.

  16. New Commitment Options: Compatibility with Emissions Trading

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This paper considers different options for quantitative greenhouse gas emission commitments from the standpoint of their technical compatibility with emissions trading. These are dynamic targets, binding targets with price caps, non-binding targets, sector-wide targets/mechanisms, action targets, allowances and endowments, and long-term permits. This paper considers these options from the standpoint of their compatibility with emissions trading.

  17. Low cost options for tissue culture technology in developing countries. Proceedings of a technical meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-02-01

    low cost options, and increasing plant survival after propagation, bioreactors, and outreach of material to the growers and farmers in developing countries. Bioreactors in plant propagation can produce millions of plants and may cut down the cost of plant production, which is yet not commonly used in developing countries. However, in the near future it could be well integrated into large scale commercial micropropagation in both developed and developing countries. In all cases, such options must be integrated without reducing the efficiency of plant propagation and compromising the plant quality. This TECDOC was prepared on the basis of contributions made by the participants in the Technical Meeting on Low Cost Tissue Culture Technology for Developing Countries, Vienna, 26-30 August 2002. This publication should be of great value to plant propagators, managers of tissue culture laboratories, scientists, organizations contemplating the establishment of new laboratories, and ongoing commercial concerns, all of whom may wish to incorporate low cost options into their day-to-day operations. Also, it would greatly serve plant propagation enterprises in developing countries with scarce funds and poor infrastructure for sustainable food production. Many of the options described can also be integrated in tissue culture laboratories that use mutation induction to develop new mutant varieties of both vegetatively and seed propagated plants, and for rapid release of the selected mutants.

  18. Low cost options for tissue culture technology in developing countries. Proceedings of a technical meeting

    International Nuclear Information System (INIS)

    2004-02-01

    low cost options, and increasing plant survival after propagation, bioreactors, and outreach of material to the growers and farmers in developing countries. Bioreactors in plant propagation can produce millions of plants and may cut down the cost of plant production, which is yet not commonly used in developing countries. However, in the near future it could be well integrated into large scale commercial micropropagation in both developed and developing countries. In all cases, such options must be integrated without reducing the efficiency of plant propagation and compromising the plant quality. This TECDOC was prepared on the basis of contributions made by the participants in the Technical Meeting on Low Cost Tissue Culture Technology for Developing Countries, Vienna, 26-30 August 2002. This publication should be of great value to plant propagators, managers of tissue culture laboratories, scientists, organizations contemplating the establishment of new laboratories, and ongoing commercial concerns, all of whom may wish to incorporate low cost options into their day-to-day operations. Also, it would greatly serve plant propagation enterprises in developing countries with scarce funds and poor infrastructure for sustainable food production. Many of the options described can also be integrated in tissue culture laboratories that use mutation induction to develop new mutant varieties of both vegetatively and seed propagated plants, and for rapid release of the selected mutants

  19. Policy implications of Iran's Nuclear Deal in technical terms for the plutonium route, uranium route, covert options, inspections, monitoring and verifications

    International Nuclear Information System (INIS)

    Pinheiro, Andre Ricardo M.

    2017-01-01

    The present Paper addresses the policy implications of Joint Comprehensive Plan of Action (JCPOA) known as 'Ian Nuclear Deal', implemented on 16 th January of 2016 between the Iran and the P5+1 countries (the U.S., U.K. France, Germany, Russia, and China), along with the EU in technical terms to analyze the Plutonium Route, Uranium Route and the Covert options and Inspections, Monitoring and Verifications. A historical review is presented to understand how the Iranian Nuclear Program is formed. Following is shown the current nuclear facilities in Iran and its capacity to process nuclear materials. It is analyzed the impact of JCPOA in Uranium and Plutonium routes. Covert Options always will be an option, so the most sensitive impact is related to the new monitoring and verification policies that must ensure real control of illegal procedures. The main conclusion is that the deal postpones the Iran's nuclear program for more than a decade (15 years), delaying Iran's nuclear bomb time from a few months to at least one year, although there is a current latent capacity to develop a nuclear bomb in Uranium route. It also gives IAEA inspectors capability to monitor nuclear activities and prevent to possible development to a nuclear bomb. To arrive in this conclusion an extensive technical analyze of impact of JCPOA in Iran's nuclear capabilities was made to discover how effective is the deal to prevent Iran to build, or acquire a nuclear weapon. (author)

  20. Policy implications of Iran's Nuclear Deal in technical terms for the plutonium route, uranium route, covert options, inspections, monitoring and verifications

    Energy Technology Data Exchange (ETDEWEB)

    Pinheiro, Andre Ricardo M., E-mail: andrericardopinheiro@usp.br [Universidade de São Paulo (USP), SP (Brazil). Departamento de Engenharia Naval; Guimarães, Leonam dos Santos, E-mail: leonam@eletronuclear.gov.br [Eletrobrás Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    The present Paper addresses the policy implications of Joint Comprehensive Plan of Action (JCPOA) known as 'Ian Nuclear Deal', implemented on 16{sup th} January of 2016 between the Iran and the P5+1 countries (the U.S., U.K. France, Germany, Russia, and China), along with the EU in technical terms to analyze the Plutonium Route, Uranium Route and the Covert options and Inspections, Monitoring and Verifications. A historical review is presented to understand how the Iranian Nuclear Program is formed. Following is shown the current nuclear facilities in Iran and its capacity to process nuclear materials. It is analyzed the impact of JCPOA in Uranium and Plutonium routes. Covert Options always will be an option, so the most sensitive impact is related to the new monitoring and verification policies that must ensure real control of illegal procedures. The main conclusion is that the deal postpones the Iran's nuclear program for more than a decade (15 years), delaying Iran's nuclear bomb time from a few months to at least one year, although there is a current latent capacity to develop a nuclear bomb in Uranium route. It also gives IAEA inspectors capability to monitor nuclear activities and prevent to possible development to a nuclear bomb. To arrive in this conclusion an extensive technical analyze of impact of JCPOA in Iran's nuclear capabilities was made to discover how effective is the deal to prevent Iran to build, or acquire a nuclear weapon. (author)

  1. New control and safety rod unit for the training reactor of the Dresden Technical University

    International Nuclear Information System (INIS)

    Adam, E.; Schab, J.; Knorr, J.

    1983-01-01

    The extension of the experimental training of students at the training reactor AKR of the Dresden Technical University requires the reconstruction of the reactor with a new control and safety rod unit. The specific conditions at the AKR led to a new variant. Results of preliminary experiments, design and mode of operation of the first unit as well as hitherto gained operation experiences are presented. (author)

  2. Scientific Opinion on a technical file submitted by the US Authorities to support a request to list a new option among the EU import requirements for wood of Agrilus planipennis host plants

    DEFF Research Database (Denmark)

    Baker, R.; Candresse, T.; Dormannsné Simon, E.

    2011-01-01

    This document presents the scientific opinion of the Panel on Plant Health on the technical file submitted by the US Authorities to support a request to list a new option among the EU import requirements for wood of Agrilus planipennis host plants. The option under consideration is a heat treatme...

  3. Technical cooperation on nuclear security between the United States and China : review of the past and opportunities for the future.

    Energy Technology Data Exchange (ETDEWEB)

    Pregenzer, Arian Leigh

    2011-12-01

    The United States and China are committed to cooperation to address the challenges of the next century. Technical cooperation, building on a long tradition of technical exchange between the two countries, can play an important role. This paper focuses on technical cooperation between the United States and China in the areas of nonproliferation, arms control and other nuclear security topics. It reviews cooperation during the 1990s on nonproliferation and arms control under the U.S.-China Arms Control Exchange, discusses examples of ongoing activities under the Peaceful Uses of Technology Agreement to enhance security of nuclear and radiological material, and suggests opportunities for expanding technical cooperation between the defense nuclear laboratories of both countries to address a broader range of nuclear security topics.

  4. Retrofit options to enable biomass firing at Irish peat plants: Background report 4.2 for the EU Joule 2+ project: Energy from biomass: An assessment of two promising systems for energy production

    International Nuclear Information System (INIS)

    Van den Broek, R.; Faaij, A.; Blaney, G.

    1995-05-01

    An overview is given of the most promising options for retrofitting existing Irish peat plants to accept biomass fuel. It is expected that with low investment costs the existing peat stations can be adapted to enable them to fire biomass. It will also be possible to co-fire peat and biomass, this option will become a way of using biomass in power generation with relatively low risk, both on the field of initial investments and supply security. The objectives of this report are: assessing the different technical options for retrofitting the plants to enable biomass firing; provide investment costs, efficiencies, emissions and expected lifetimes for the different retrofit options. The results from this study are used in the final integration phase of the EU-Joule project 'Energy from biomass'. Chapter 2 deals with methodological considerations which have been made in estimation of the investment costs. In chapter 3 the present situation is described. Both peat harvesting and power plant operation of both sod and milled peat plants are explained. Also some past experiences with wood chips firing in Irish peat stations are discussed. Chapter 4 gives a general view on retrofitting peat plants to enable biomass firing. Some starting points like biomass fuel feeding and emission standards that have to be met are highlighted. The rationale behind four main choices are given. Finally, a technical description is presented of the two boiler adaptations that will be considered among the different retrofit options, namely conversion of milled peat units into bubbling fluidized bed and into a whole tree energy unit. Six retrofit options are described in more detail in chapter 5. Information is given on the present status of the plants, the technical considerations of the retrofit, expected performance and an estimation of a range in which the investment costs can be expected. 4 figs., 10 tabs., 5 appendices

  5. Non-burn electric generation: How today's options stack up

    International Nuclear Information System (INIS)

    1993-01-01

    The technical preparedness to generate electricity without burning fuel is dealt with. Nuclear, hydroelectric, solar and wind energy are recommended as the clean options. The aims of energy policy, views upon regulation, technical maturity and commercial preparedness of such variants are discussed. (Z.S.). 4 figs

  6. Repowering options for steam power plants

    International Nuclear Information System (INIS)

    Wen, H.; Gopalarathinam, R.

    1992-01-01

    Repowering an existing steam power plant with a gas turbine offers an attractive alternative to a new plant or life extension, especially for unit sizes smaller than 300 MWe. Gas turbine repowering improves thermal efficiency and substantially increases the plant output. Based on recent repowering studies and projects, this paper examines gas turbine repowering options for 100 MWe, 200 MWe and 300 MWe units originally designed for coal firing and currently firing either coal or natural gas. Also discussed is the option for a phased future conversion of the repowered unit to fire coal-derived gas, should there be a fluctuation in the price or availability of natural gas. A modular coal gasification plant designed to shorten the conversion time is presented. Repowering options, performance, costs, and availability impacts are discussed for selected cases

  7. Technical evaluation report on the proposed design modifications and technical specification changes on grid voltage degradation for the Millstone Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification change for protection of Class 1E equipment from grid voltage degradation for the Millstone Nuclear Power Station, Unit 1. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation finds that the licensee has not provided sufficient information on the undervoltage protection system to allow a complete evaluation into the adequacy of protecting the Class 1E equipment from sustained voltage degradation

  8. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  9. Life extension program of KORI Unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Hong, Sun-Yull

    1998-01-01

    The two phases of Life extension program for KORI Unit 1 NPP are presented. Phase I is completed. It was concluded that life extension is a feasible option in technical and economic aspects. Detailed analysis of RPV is underway, plan for Phase II is finished. It deals with screening and sorting of all relevant SSCs, detailed life evaluation of SSCs, ageing management program and documentation for license renewal application

  10. Low-level radioactive waste management options

    International Nuclear Information System (INIS)

    Schmalz, R.F.

    1989-01-01

    This paper discusses the non-technical problems associated with the social and political obstacles to the secure disposal of low level radioactive waste. The author reviews thirty years' experience managing non-military wastes. The merits of available options are considered

  11. Options for rural electrification in Mexico

    International Nuclear Information System (INIS)

    Vera, J.G.

    1992-01-01

    This paper summarizes a study which examined 19 commercially available options for electrifying remote communities in Mexico. Characteristics of a typical community are defined and, using 7 of the technologies, power systems are designed capable of supporting this community. The performance of these systems is evaluated with respect to their ability to satisfy 11 technical design objectives, 5 socioeconomic objectives, and their impact on the environment. A photovoltaic- diesel generator hybrid system with wind generator option is recommended for the typical community

  12. A guide to technical information regarding TMI-2 [Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Aucliar, K.D.; Epler, J.

    1988-01-01

    A considerable amount of information has been obtained and documented concerning the March 1979 accident and its consequences at the Three Mile Island Unit 2 (TMI-2) nuclear generating station. The information has been essential in (a) understanding the nature, progression, and extent of the damage from the accident; (b) assessing the effects of this damage on the plant's facilities, systems, equipment, and surrounding environment; and (c) planning, preparation, performance, and evaluation of the accident recovery activities. The composite of all of this literature is the technical information available at TMI-2. The issues raised by the accident are far-reaching and complex, and the technical information has usefulness beyond its application at TMI-2. Issues raised as a result of the accident pose questions that are technical, legal, financial, and political in nature. However, because the quantity of information is vast, this paper focuses on the technical data generated as a result of the TMI-2 accident recovery activities. Most of the written information generated during the TMI-2 recovery program was provided to meet the needs of the various key participants in the recovery. The informational needs of these groups varied widely; consequently, their motivation for record retention, content, and structure revolved around serving those needs. This paper provides some guidance to those researchers interested in investigating technical data as it relates to TMI-2

  13. ITER technical advisory committee meeting at Garching

    International Nuclear Information System (INIS)

    Fujiwara, M.

    1999-01-01

    The ITER Technical Advisory Committee meeting took place on 24-27 February at the Garching Joint Work Site. According to the discussions at the ITER meeting in Yokohama in October 1998, the Technical Advisory Committee was requested to conduct a thorough review of the document 'Options for the reduced technical objectives / reduced cost ITER'

  14. Private Education in the Absence of a Public Option: The Cases of the United Arab Emirates and Qatar

    Science.gov (United States)

    Ridge, Natasha Y.; Shami, Soha; Kippels, Susan M.

    2016-01-01

    In the face of rising demand for private schooling in the United Arab Emirates (UAE) and Qatar, a lack of affordable schooling options, monopolistic behavior of private education providers, and unpredictable government regulations have created a complex and unequal education sector. This research employs a mixed methods comparative approach to…

  15. Reasons for the nuclear power option

    International Nuclear Information System (INIS)

    Rotaru, I.; Glodeanu, F.; Mauna, T.

    1994-01-01

    Technical, economical and social reasons, strongly supporting the nuclear power option are reviewed. The history of Romanian nuclear power program is outlined with a particular focus on the Cernavoda Nuclear Power Plant project. Finally the prospective of nuclear power in Romania are assessed

  16. Social and Business Entrepreneurship as Career Options for University Students in the United Arab Emirates: The Drive-Preparedness Gap

    Science.gov (United States)

    Ashour, Sanaa

    2016-01-01

    With limited employment opportunities, entrepreneurship is becoming a viable option to combat unemployment. This study explores undergraduate students' attitudes towards business and social entrepreneurship in the United Arab Emirates (UAE), assuming that the lack of awareness among students regarding social entrepreneurship and the lack of…

  17. Non-governmental organizational health operations in humanitarian crises: the case for technical support units.

    Science.gov (United States)

    Greenough, P Gregg; Nazerali, Rahim; Fink, Sheri; VanRooyen, Michael J

    2007-01-01

    As the humanitarian health response industry grows, there is a need for technical health expertise that can build an evidence base around outcome measures and raise the quality and accountability of the health relief response. We propose the formation of technical support units (TSUs), entities of health expertise institutionalized within humanitarian non-governmental organizations (NGOs), which will bridge the gap between the demand for evidence-based, humanitarian programming and the field capacity to accomplish it. With the input of major humanitarian NGOs and donors, this paper discusses the attributes and capacities ofTSUs; and the mechanisms for creating and enhancing TSUs within the NGO management structure.

  18. An integrated appraisal of energy recovery options in the United Kingdom using solid recovered fuel derived from municipal solid waste.

    Science.gov (United States)

    Garg, A; Smith, R; Hill, D; Longhurst, P J; Pollard, S J T; Simms, N J

    2009-08-01

    This paper reports an integrated appraisal of options for utilising solid recovered fuels (SRF) (derived from municipal solid waste, MSW) in energy intensive industries within the United Kingdom (UK). Four potential co-combustion scenarios have been identified following discussions with industry stakeholders. These scenarios have been evaluated using (a) an existing energy and mass flow framework model, (b) a semi-quantitative risk analysis, (c) an environmental assessment and (d) a financial assessment. A summary of results from these evaluations for the four different scenarios is presented. For the given ranges of assumptions; SRF co-combustion with coal in cement kilns was found to be the optimal scenario followed by co-combustion of SRF in coal-fired power plants. The biogenic fraction in SRF (ca. 70%) reduces greenhouse gas (GHG) emissions significantly ( approximately 2500 g CO(2) eqvt./kg DS SRF in co-fired cement kilns and approximately 1500 g CO(2) eqvt./kg DS SRF in co-fired power plants). Potential reductions in electricity or heat production occurred through using a lower calorific value (CV) fuel. This could be compensated for by savings in fuel costs (from SRF having a gate fee) and grants aimed at reducing GHG emission to encourage the use of fuels with high biomass fractions. Total revenues generated from coal-fired power plants appear to be the highest ( 95 pounds/t SRF) from the four scenarios. However overall, cement kilns appear to be the best option due to the low technological risks, environmental emissions and fuel cost. Additionally, cement kiln operators have good experience of handling waste derived fuels. The scenarios involving co-combustion of SRF with MSW and biomass were less favourable due to higher environmental risks and technical issues.

  19. An integrated appraisal of energy recovery options in the United Kingdom using solid recovered fuel derived from municipal solid waste

    International Nuclear Information System (INIS)

    Garg, A.; Smith, R.; Hill, D.; Longhurst, P.J.; Pollard, S.J.T.; Simms, N.J.

    2009-01-01

    This paper reports an integrated appraisal of options for utilising solid recovered fuels (SRF) (derived from municipal solid waste, MSW) in energy intensive industries within the United Kingdom (UK). Four potential co-combustion scenarios have been identified following discussions with industry stakeholders. These scenarios have been evaluated using (a) an existing energy and mass flow framework model, (b) a semi-quantitative risk analysis, (c) an environmental assessment and (d) a financial assessment. A summary of results from these evaluations for the four different scenarios is presented. For the given ranges of assumptions; SRF co-combustion with coal in cement kilns was found to be the optimal scenario followed by co-combustion of SRF in coal-fired power plants. The biogenic fraction in SRF (ca. 70%) reduces greenhouse gas (GHG) emissions significantly (∼2500 g CO 2 eqvt./kg DS SRF in co-fired cement kilns and ∼1500 g CO 2 eqvt./kg DS SRF in co-fired power plants). Potential reductions in electricity or heat production occurred through using a lower calorific value (CV) fuel. This could be compensated for by savings in fuel costs (from SRF having a gate fee) and grants aimed at reducing GHG emission to encourage the use of fuels with high biomass fractions. Total revenues generated from coal-fired power plants appear to be the highest ( Pounds 95/t SRF) from the four scenarios. However overall, cement kilns appear to be the best option due to the low technological risks, environmental emissions and fuel cost. Additionally, cement kiln operators have good experience of handling waste derived fuels. The scenarios involving co-combustion of SRF with MSW and biomass were less favourable due to higher environmental risks and technical issues.

  20. Technical Specifications, Comanche Peak Steam Electric Station, Unit 1 (Docket No. 50-445)

    International Nuclear Information System (INIS)

    1990-04-01

    The Technical Specifications for Comanche Peak Steam Electric Station, Unit 1 were prepared by the US Nuclear Regulatory Commission. They set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility, as set forth in Section 50.36 of Title 10 of the Code of Federal Regulations Part 50, for the protection of the health and safety of the public

  1. 7 CFR 457.172 - Coverage Enhancement Option.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Coverage Enhancement Option. 457.172 Section 457.172..., DEPARTMENT OF AGRICULTURE COMMON CROP INSURANCE REGULATIONS § 457.172 Coverage Enhancement Option. The Coverage Enhancement Option for the 2009 and succeeding crop years are as follows: FCIC policies: United...

  2. Technical-evaluation report on the proposed technical-specification changes for the inservice surveillance of safety-related hydraulic and mechanical snubbers at the Millstone Nuclear Power Station, Unit 2 (Docket No. 50-336)

    International Nuclear Information System (INIS)

    Selan, J.C.

    1983-01-01

    This report documents the technical evaluation of the proposed Technical Specification changes to Limiting Conditions for Operation, Surveillance Requirements and Bases for safety-related hydraulic and mechanical snubbers at the Millstone Nuclear Power Station, Unit 2. The evaluation is to determine whether the proposed Technical Specifications are in conformance with the model Standard Technical Specification set forth by the NRC. A check list, Appendix A of this report, compares the licensee's submittal with the NRC requirements and includes Proposed Resolution of the Deviations

  3. Technical efficiency of primary health units in Kailahun and Kenema districts of Sierra Leone

    Directory of Open Access Journals (Sweden)

    Kirigia Joses M

    2011-05-01

    Full Text Available Abstract Background The objectives of the study reported in this paper were to (i estimate the technical efficiency of samples of community health centres (CHCs, community health posts (CHPs and maternal and child health posts (MCHPs in Kailahun and Kenema districts of Sierra Leone, (ii estimate the output increases needed to make inefficient MCHPs, CHCs and CHPs efficient, and (iii explore strategies for increasing technical efficiency of these institutions. Methods This study applies the data envelopment analysis (DEA approach to analyse technical efficiency of random samples of 36 MCHPs, 22 CHCs and 21 CHPs using input and output data for 2008. Results The findings indicate that 77.8% of the MCHPs, 59.1% of the CHCs and 66.7% of the CHPs were variable returns to scale technically inefficient. The average variable returns to scale technical efficiency was 68.2% (SD = 27.2 among the MCHPs, 69.2% (SD = 33.2 among the CHCs and 59% (SD = 34.7 among the CHPs. Conclusion This study reveals significant technical inefficiencies in the use of health system resources among peripheral health units in Kailahun and Kenema districts of Sierra Leone. There is need to strengthen national and district health information systems to routinely track the quantities and prices of resources injected into the health care systems and health service outcomes (indicators of coverage, quality and health status to facilitate regular efficiency analyses.

  4. Non-technical skills in the intensive care unit

    NARCIS (Netherlands)

    Reader, T.; Flin, R.; Lauche, K.; Cuthbertson, B.H.

    2006-01-01

    In high-risk industries such as aviation, the skills not related directly to technical expertise, but crucial for maintaining safety (e.g. teamwork), have been categorized as non-technical skills. Recently, research in anaesthesia has identified and developed a taxonomy of the non-technical skills

  5. Cell phone recycling experiences in the United States and potential recycling options in Brazil.

    Science.gov (United States)

    Silveira, Geraldo T R; Chang, Shoou-Yuh

    2010-11-01

    This paper presents an overview of cell phone recycling programs currently available in the United States. At the same time, it also provides analyses of the current recycling situation and possible recycling alternatives for Brazil. Although there are several recycling options in the United States, collection rates are still only 10% of all potential devices because customers are not aware of these possibilities. The whole system is financially based on reselling refurbished cell phones and recycled materials to developing countries which represent an effective and strong market. Several recyclers offer funds to collection partners who are either charities or who work with charities while obtaining the materials that they need in order to run their operations. A mobile phone recycling system for Brazil considering the United States experience and the Extended Producer Responsibility (EPR) principle is suggested. A deposit/refund/advance-recycling fee is proposed which might be implemented as a voluntary industrial initiative managed by PRO Brazil, a producer responsibility organization. One widespread public-private agreement will integrate all mobile phone stakeholders, and environmental education actions and promotional events will promote citizen's participation. Copyright © 2010 Elsevier Ltd. All rights reserved.

  6. 76 FR 3684 - Self-Regulatory Organizations; The Options Clearing Corporation; Order Granting Approval of...

    Science.gov (United States)

    2011-01-20

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-63711; File No. SR-ODD-2011-01] Self-Regulatory... to the Options Disclosure Document Reflecting Certain Changes to Disclosure Regarding Credit Default Options in, and Making Certain Technical Amendments to, the June 2007 Supplement to the Options Disclosure...

  7. Nuclear instrument maintenance and technical training in Nuclear Energy Unit

    International Nuclear Information System (INIS)

    Mohamad Nasir Abdul Wahid

    1987-01-01

    Instrument maintenance service is a necessity in a Nuclear Research Institute, such as the Nuclear Energy Unit (NEU) to ensure the smooth running of our research activities. However, realising that maintenance back-up service for either nuclear or other scientific equipment is a major problem in developing countries such as Malaysia, NEU has set up an Instrumentation and Control Department to assist in rectifying the maintenance problem. Beside supporting in house activities in NEU, the Instrumentation and Control Department (I and C) is also geared into providing services to other organisations in Malaysia. This paper will briefly outline the activities of NEU in nuclear instrument maintenance as well as in technical training. (author)

  8. Computation code TEP 1 for automated evaluation of technical and economic parameters of operation of WWER-440 nuclear power plant units

    International Nuclear Information System (INIS)

    Zadrazil, J.; Cvan, M.; Strimelsky, V.

    1987-01-01

    The TEP 1 program is used for automated evaluation of the technical and economic parameters of nuclear power plant units with WWER-440 reactors. This is an application program developed by the Research Institute for Nuclear Power Plants in Jaslovske Bohunice for the KOMPLEX-URAN 2M information system, delivered by the USSR to the V-2 nuclear power plants in Jaslovske Bohunice and in Dukovany. The TEP 1 program is written in FORTRAN IV and its operation has two parts. First the evaluation of technical and economic parameters of operation for a calculation interval of 10 mins and second, the control of the calculation procedure, follow-up on input data, determination of technical and economic parameters for a lengthy time interval, and data printout and storage. The TEP 1 program was tested at the first unit of the V-2 power plant and no serious faults appeared in the process of the evaluation of technical and economic parameters. A modification of the TEP 1 programme for the Dukovany nuclear power plant is now being tested on the first unit of the plant. (Z.M.)

  9. Energy options?; Energie opties?

    Energy Technology Data Exchange (ETDEWEB)

    Van Sark, W. (ed.)

    2006-05-15

    March 2006 the so-called Options Document was published by the Energy research Centre of the Netherlands (ECN) and the Netherlands Environmental Assessment Agency (MNP). The document is an overview of technical options to reduce energy consumption and emission of greenhouse gases up to 2020. Next to a brief summary of the document a few reactions and comments on the contents of the document are given. [Dutch] Maart 2006 publiceerde het Energieonderzoek Centrum Nederland (ECN) en het Milieu- en Natuurplanbureau (MNP) het zogenaamde Optiedocument energie en emissies 2010-2020. Daarin wordt een overzicht gegeven van de technische mogelijkheden voor vermindering van het energieverbruik en de uitstoot van broeikasgassen en luchtverontreinigende stoffen tot 2020. Naast een korte samenvatting van het document worden enkele reacties gegeven op de inhoud.

  10. Evaluating technology service options.

    Science.gov (United States)

    Blumberg, D F

    1997-05-01

    Four service and support options are available to healthcare organizations for maintaining their growth arsenals of medical and information technology. These options include maintaining and servicing all equipment using a facility-based biomedical engineering and MIS service department; using a combination of facility-based service and subcontracted service; expanding facility-based biomedical and MIS service departments to provide service to other healthcare organizations to achieve economies of scale; and outsourcing all maintenance, repair, and technical support services. Independent service companies and original equipment manufacturers (OEMs) are offering healthcare organizations a wider array of service and support capabilities than ever before. However, some health systems have successfully developed their own independent service organizations to take care of their own--and other healthcare organizations'--service and support needs.

  11. Non-technical skills of surgical trainees and experienced surgeons.

    Science.gov (United States)

    Gostlow, H; Marlow, N; Thomas, M J W; Hewett, P J; Kiermeier, A; Babidge, W; Altree, M; Pena, G; Maddern, G

    2017-05-01

    In addition to technical expertise, surgical competence requires effective non-technical skills to ensure patient safety and maintenance of standards. Recently the Royal Australasian College of Surgeons implemented a new Surgical Education and Training (SET) curriculum that incorporated non-technical skills considered essential for a competent surgeon. This study sought to compare the non-technical skills of experienced surgeons who completed their training before the introduction of SET with the non-technical skills of more recent trainees. Surgical trainees and experienced surgeons undertook a simulated scenario designed to challenge their non-technical skills. Scenarios were video recorded and participants were assessed using the Non-Technical Skills for Surgeons (NOTSS) scoring system. Participants were divided into subgroups according to years of experience and their NOTSS scores were compared. For most NOTSS elements, mean scores increased initially, peaking around the time of Fellowship, before decreasing roughly linearly over time. There was a significant downward trend in score with increasing years since being awarded Fellowship for six of the 12 NOTSS elements: considering options (score -0·015 units per year), implementing and reviewing decisions (-0·020 per year), establishing a shared understanding (-0·014 per year), setting and maintaining standards (-0·024 per year), supporting others (-0·031 per year) and coping with pressure (-0·015 per year). The drop in NOTSS score was unexpected and highlights that even experienced surgeons are not immune to deficiencies in non-technical skills. Consideration should be given to continuing professional development programmes focusing on non-technical skills, regardless of the level of professional experience. © 2017 BJS Society Ltd Published by John Wiley & Sons Ltd.

  12. Risk assessment analysis of the future technical unit dedicated to the evaluation and treatment of motor disabilities.

    Science.gov (United States)

    Grelier, S; Thetio, M; Quentin, V; Achache, V; Sanchez, N; Leroux, V; Durand, E; Pequignot, R

    2011-03-01

    The National Hospital of Saint Maurice (HNSM) for Physical Medicine and Rehabilitation aims at strengthening its position as a pivot rehabilitation and physical therapy center. The opening in 2011 of a new unit for the evaluation and treatment of motor disabilities meets this objective. This project includes several parts: clinical, financial, architectural, organizational, applied clinical research as well as dealing with medical equipments and information system. This study focuses on the risk assessment of this future technical unit. This study was conducted by a group of professionals working for the hospital. It started with the design of a functional model to better comprehend the system to be analyzed. Risk assessment consists in confronting this functional model to a list of dangers in order to determine the vulnerable areas of the system. Then the team designed some scenarios to identify the causes, securities barriers and consequences in order to rank the risks. The analysis targeted various dangers, e.g. political, strategic, financial, economical, marketing, clinical and operational. The team identified more than 70 risky scenarios. For 75% of them the criticality level was deemed initially tolerable and under control or unacceptable. The implementation of an action plan for reducing the level of risks before opening this technical unit brought the system down to an acceptable level at 66%. A year prior to opening this technical unit for the evaluation and treatment of motor disabilities, conducting this preliminary risk assessment, with its exhaustive and rigorous methodology, enabled the concerned professionals to work together around an action plan for reducing the risks. 2011 Elsevier Masson SAS. All rights reserved.

  13. Another Look at the Draft Mil-Std-1540E Unit Random Vibration Test Requirements

    Science.gov (United States)

    Perl, E.; Peterson, A. J..; Davis, D.

    2012-07-01

    The draft Mil-Std-1540E has been updated to reflect lessons learned since its publication as an SMC Standard in 2008, [1], and an earlier Aerospace Corporation Technical Report released in 2006, [2]. This paper discusses the technical rationale supporting some of the unit random vibration test requirements to provide better insight into their derivation and application to programs. It is intended that these requirements be tailored for each program to reflect the customer risk profile. Several tailoring options are provided and a two phase test strategy is discussed to highlight its applicability to utilizing heritage hardware in new applications.

  14. Technical-evaluation report on the proposed technical-specification changes for the inservice surveillance of safety-related hydraulic and mechanical snubbers at the Indian Point Nuclear Power Plant, Unit 3 (Docket No. 50-286)

    International Nuclear Information System (INIS)

    Selan, J.C.

    1983-01-01

    This report documents the technical evaluation of the proposed Technical Specification changes to Limiting Conditions for Operation, Surveillance Requirements and Bases for safety-related hydraulic and mechanical snubbers at the Indian Point Nuclear Power Plant, Unit 3. The evaluation is to determine whether the proposed Technical Specifications are in conformance with the model Standard Technical Specification set forth by the NRC. A check list, Appendix A of this report, compares the licensee's submittal with the NRC requirements and includes Proposed Resolution of the Deviations

  15. Technical Assessments of Future European Space Transportation Options

    OpenAIRE

    Sippel, Martin; van Foreest, Arnold; Dutheil, Jean-Philippe; Philip, Peter

    2007-01-01

    The paper describes some of the most recent activities in Germany in the technical assessment of future European launcher architecture. In focus is a joint effort of DLR-SART with German launcher industry in the definition of a next generation upper-medium class expendable TSTO with an initial operational capability after 2020. Involved companies are EADS astrium and MT Aerospace. This DLR-agency funded study WOTAN investigates fully cryogenic launchers as well as those with a com...

  16. Shungnak Energy Configuration Options.

    Energy Technology Data Exchange (ETDEWEB)

    Rosewater, David Martin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Eddy, John P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    Power systems in rural Alaska villages face a unique combination of challenges that can increase the cost of energy and lowers energy supply reliability. In the case of the remote village of Shungnak, diesel and heating fuel is either shipped in by barge or flown in by aircraft. This report presents a technical analysis of several energy infrastructure upgrade and modification options to reduce the amount of fuel consumed by the community of Shungnak. Reducing fuel usage saves money and makes the village more resilient to disruptions in fuel supply. The analysis considers demand side options, such as energy efficiency, alongside the installation of wind and solar power generation options. Some novel approaches are also considered including battery energy storage and the use of electrical home heating stoves powered by renewable generation that would otherwise be spilled and wasted. This report concludes with specific recommendations for Shungnak based on economic factors, and fuel price sensitivity. General conclusions are also included to support future work analyzing similar energy challenges in remote arctic regions.

  17. The safeguards options study

    Energy Technology Data Exchange (ETDEWEB)

    Hakkila, E.A.; Mullen, M.F.; Olinger, C.T.; Stanbro, W.D. [Los Alamos National Lab., NM (United States); Olsen, A.P.; Roche, C.T.; Rudolph, R.R. [Argonne National Lab., IL (United States); Bieber, A.M.; Lemley, J. [Brookhaven National Lab., Upton, NY (United States); Filby, E. [Idaho National Engineering Lab., Idaho Falls, ID (United States)] [and others

    1995-04-01

    The Safeguards Options Study was initiated to aid the International Safeguards Division (ISD) of the DOE Office of Arms Control and Nonproliferation in developing its programs in enhanced international safeguards. The goal was to provide a technical basis for the ISD program in this area. The Safeguards Options Study has been a cooperative effort among ten organizations. These are Argonne National Laboratory, Brookhaven National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, Mound Laboratory, Oak Ridge National Laboratory, Pacific Northwest Laboratories, Sandia National Laboratories, and Special Technologies Laboratory. Much of the Motivation for the Safeguards Options Study is the recognition after the Iraq experience that there are deficiencies in the present approach to international safeguards. While under International Atomic Energy Agency (IAEA) safeguards at their declared facilities, Iraq was able to develop a significant weapons program without being noticed. This is because negotiated safeguards only applied at declared sites. Even so, their nuclear weapons program clearly conflicted with Iraq`s obligations under the Nuclear Nonproliferation Treaty (NPT) as a nonnuclear weapon state.

  18. The safeguards options study

    International Nuclear Information System (INIS)

    Hakkila, E.A.; Mullen, M.F.; Olinger, C.T.; Stanbro, W.D.; Olsen, A.P.; Roche, C.T.; Rudolph, R.R.; Bieber, A.M.; Lemley, J.; Filby, E.

    1995-04-01

    The Safeguards Options Study was initiated to aid the International Safeguards Division (ISD) of the DOE Office of Arms Control and Nonproliferation in developing its programs in enhanced international safeguards. The goal was to provide a technical basis for the ISD program in this area. The Safeguards Options Study has been a cooperative effort among ten organizations. These are Argonne National Laboratory, Brookhaven National Laboratory, Idaho National Engineering Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, Mound Laboratory, Oak Ridge National Laboratory, Pacific Northwest Laboratories, Sandia National Laboratories, and Special Technologies Laboratory. Much of the Motivation for the Safeguards Options Study is the recognition after the Iraq experience that there are deficiencies in the present approach to international safeguards. While under International Atomic Energy Agency (IAEA) safeguards at their declared facilities, Iraq was able to develop a significant weapons program without being noticed. This is because negotiated safeguards only applied at declared sites. Even so, their nuclear weapons program clearly conflicted with Iraq's obligations under the Nuclear Nonproliferation Treaty (NPT) as a nonnuclear weapon state

  19. Weapons-grade plutonium dispositioning. Volume 2: Comparison of plutonium disposition options

    International Nuclear Information System (INIS)

    Brownson, D.A.; Hanson, D.J.; Blackman, H.S.

    1993-06-01

    The Secretary of Energy requested the National Academy of Sciences (NAS) Committee on International Security and Arms Control to evaluate disposition options for weapons-grade plutonium. The Idaho National Engineering Laboratory (INEL) offered to assist the NAS in this evaluation by investigating the technical aspects of the disposition options and their capability for achieving plutonium annihilation levels greater than 90%. This report was prepared for the NAS to document the gathered information and results from the requested option evaluations. Evaluations were performed for 12 plutonium disposition options involving five reactor and one accelerator-based systems. Each option was evaluated in four technical areas: (1) fuel status, (2) reactor or accelerator-based system status, (3) waste-processing status, and (4) waste disposal status. Based on these evaluations, each concept was rated on its operational capability and time to deployment. A third rating category of option costs could not be performed because of the unavailability of adequate information from the concept sponsors. The four options achieving the highest rating, in alphabetical order, are the Advanced Light Water Reactor with plutonium-based ternary fuel, the Advanced Liquid Metal Reactor with plutonium-based fuel, the Advanced Liquid Metal Reactor with uranium-plutonium-based fuel, and the Modular High Temperature Gas-Cooled Reactor with plutonium-based fuel. Of these four options, the Advanced Light Water Reactor and the Modular High Temperature Gas-Cooled Reactor do not propose reprocessing of their irradiated fuel. Time constraints and lack of detailed information did not allow for any further ratings among these four options. The INEL recommends these four options be investigated further to determine the optimum reactor design for plutonium disposition

  20. Weapons-grade plutonium dispositioning. Volume 2: Comparison of plutonium disposition options

    Energy Technology Data Exchange (ETDEWEB)

    Brownson, D.A.; Hanson, D.J.; Blackman, H.S. [and others

    1993-06-01

    The Secretary of Energy requested the National Academy of Sciences (NAS) Committee on International Security and Arms Control to evaluate disposition options for weapons-grade plutonium. The Idaho National Engineering Laboratory (INEL) offered to assist the NAS in this evaluation by investigating the technical aspects of the disposition options and their capability for achieving plutonium annihilation levels greater than 90%. This report was prepared for the NAS to document the gathered information and results from the requested option evaluations. Evaluations were performed for 12 plutonium disposition options involving five reactor and one accelerator-based systems. Each option was evaluated in four technical areas: (1) fuel status, (2) reactor or accelerator-based system status, (3) waste-processing status, and (4) waste disposal status. Based on these evaluations, each concept was rated on its operational capability and time to deployment. A third rating category of option costs could not be performed because of the unavailability of adequate information from the concept sponsors. The four options achieving the highest rating, in alphabetical order, are the Advanced Light Water Reactor with plutonium-based ternary fuel, the Advanced Liquid Metal Reactor with plutonium-based fuel, the Advanced Liquid Metal Reactor with uranium-plutonium-based fuel, and the Modular High Temperature Gas-Cooled Reactor with plutonium-based fuel. Of these four options, the Advanced Light Water Reactor and the Modular High Temperature Gas-Cooled Reactor do not propose reprocessing of their irradiated fuel. Time constraints and lack of detailed information did not allow for any further ratings among these four options. The INEL recommends these four options be investigated further to determine the optimum reactor design for plutonium disposition.

  1. Comparative studies of energy supply options in Poland for 1997-2020

    International Nuclear Information System (INIS)

    2002-08-01

    Poland depends heavily on coal to satisfy national demands for electricity. Currently, over 90% of electricity generation is produced by coal fired power plants. Because of the large dependence on coal and environmental impacts of large-scale coal combustion the country looks for a more diversified energy mix. As ways of diversification, Poland is considering the expanded role of natural gas and, potentially, nuclear power in the future energy mix. This publication describes the analysis of several diversification options for the Polish energy sector conducted by a national team in the framework of an IAEA Technical Cooperation project implemented in 1999-2000. The project provided a set of proven IAEA methodologies and tools that was utilized for a comprehensive analysis and comparison of the options including their economic competitiveness and environmental impacts. The publication is intended primarily for senior experts and technical staff in governmental organizations, research institutes, industries and utilities, who are in charge of technical analysis or decision making related to long term energy and power supply options. The report was prepared in 2001 by the staff of the Energy Market Agency (EMA, Warsaw, Poland) that was the leading Polish organization in carrying out the study

  2. Double row spacing and drip irrigation as technical options in energy sorghum management

    Directory of Open Access Journals (Sweden)

    Neri Roncucci

    2014-02-01

    Full Text Available The effect of two row spacing configurations and four water supply levels was investigated on sweet and fibre sorghum in Central Italy for two consecutive years. Results highlighted the influence of both irrigation and row spatial configuration on crop productivity. Indeed, several studies have pointed out the positive response of sorghum to irrigation in Mediterranean climate, as in this environment water stress represents one of the main limiting factors on crop productivity. On the other hand, few attempts have been made to explore the role of row spacing on energy sorghum productivity. Results outlined an average increase in sorghum dry biomass yield ranging from +23% to +79% at variable rates of water supply as compared to rainfed control. The positive effect of irrigation was also observed on leaf area index and radiation use efficiency. Moreover, we observed a crop yield increase, from 9% to 20%, under double row spacing compared to the standard planting pattern (i.e. single row spacing. Finally, it was confirmed the efficient use of water by sorghum and the great ability of sorghum to increase its biomass yield in response to increasing volumes of water supplied. Therefore, this work suggests how row spacing configuration and drip irrigation could be feasible technical options to increase sorghum biomass yields in Mediterranean environments. These techniques should be experienced by farmers towards a sustainable intensification of current cropping systems.

  3. Policy options for stabilizing global climate

    International Nuclear Information System (INIS)

    Lashof, D.A.; Tirpak, D.A.

    1990-12-01

    This report to congress by the US EPA explains the greenhouse effect and its influence on global climate. It outlines the trends in the greenhouse gases - their concentration history, distribution, sources and sinks and chemical and radiative properties. Climate change processes are discussed including climate feedbacks. Human activities affecting trace gases and climate are explained, followed by a chapter on the technical options for reducing greenhouse gas emissions which looks at energy services, energy supply, industry, forestry and agriculture. The future is considered, and the final chapters are concerned with policy options and international cooperation to reduce greenhouse gas emissions. 934 refs., 102 figs., 84 tabs

  4. Energy options in the United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Evans, S C [ed.

    1975-01-01

    The United Kingdom faces two issues: how can it survive the present massive increases in oil prices and the probability of even more expensive supplies in the future or how can it adjust to the eventual exhaustion of both fossil and nuclear fuels. The theme of the symposium concerned a search for a practical alternative source of energy to fossil and nuclear fuels and which ones would work in the United Kingdom. Papers were presented entitled: Geothermal Energy; Solar Energy in Britain; and Wind and Water Sources of Energy in the United Kingdom. A final paper, High- and Low-Growth Scenarios, examined these two types for the future. Many questions, answeres and comments about energy sources are contained in a final presentation. (MCW)

  5. Stock and option portfolio using fuzzy logic approach

    Science.gov (United States)

    Sumarti, Novriana; Wahyudi, Nanang

    2014-03-01

    Fuzzy Logic in decision-making process has been widely implemented in various problems in industries. It is the theory of imprecision and uncertainty that was not based on probability theory. Fuzzy Logic adds values of degree between absolute true and absolute false. It starts with and builds on a set of human language rules supplied by the user. The fuzzy systems convert these rules to their mathematical equivalents. This could simplify the job of the system designer and the computer, and results in much more accurate representations of the way systems behave in the real world. In this paper we examine the decision making process of stock and option trading by the usage of MACD (Moving Average Convergence Divergence) technical analysis and Option Pricing with Fuzzy Logic approach. MACD technical analysis is for the prediction of the trends of underlying stock prices, such as bearish (going downward), bullish (going upward), and sideways. By using Fuzzy C-Means technique and Mamdani Fuzzy Inference System, we define the decision output where the value of MACD is high then decision is "Strong Sell", and the value of MACD is Low then the decision is "Strong Buy". We also implement the fuzzification of the Black-Scholes option-pricing formula. The stock and options methods are implemented on a portfolio of one stock and its options. Even though the values of input data, such as interest rates, stock price and its volatility, cannot be obtain accurately, these fuzzy methods can give a belief degree of the calculated the Black-Scholes formula so we can make the decision on option trading. The results show the good capability of the methods in the prediction of stock price trends. The performance of the simulated portfolio for a particular period of time also shows good return.

  6. Westinghouse Owners Group Risk-Informed Regulation Efforts: Options 2 and 3

    International Nuclear Information System (INIS)

    Brown, Jason A.; Osterrieder, Robert A.; Lutz, Robert J.; Dingler, Maurice; Ward, Lewis A.

    2002-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has initiated efforts to incorporate risk-informed methods to redefine the scope of the existing 10 CFR 50 regulations (Option 2) and to change the technical requirements of the regulations (Option 3). The overall objectives of these efforts are to enhance plant safety, provide a framework for risk-informed regulations, add flexibility to plant operations, and reduce regulatory burden. The Westinghouse Owners Group (WOG) has a variety of active programs in the risk-informed area, including a program in the Option 2 and Option 3 areas. These two programs will be summarized including the benefits and the technical approach. The purpose of Option 2 is to make changes to the overall scope of structures, systems and components (SSCs) covered by 10 CFR 50 requiring special treatment by formulating new risk-informed safety classification categories that are linked to current definitions of safety-related and important-to-safety. This initiative would permit possible changes to the current special treatment requirements based on risk insights. The Nuclear Energy Institute (NEI) has developed an Option 2 implementation guideline (NEI 00-04 Draft Revision B). The WOG has initiated a program to validate the NEI guideline and to provide an initial cost-benefit assessment of the revised categorization and treatment under Option 2 via trial application to two systems at both Surry Unit 1 and Wolf Creek. The WOG Option 2 program includes consideration of all of the components in the selected systems, regardless of whether or not they are modeled in the respective plant probabilistic risk assessment (PRA) studies. As a result, quantitative risk measures are not available for many of the components being considered. In this case, the WOG program will provide valuable input to the NEI guideline. Additionally, the WOG program extends the use of both of the dominant methodologies for risk-informed ISI (RI-ISI) to address repair and

  7. Solar energy options: Technical economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    Visentin, R

    1982-01-01

    A general system approach on the earth suggests the conversion and distribution of solar energy as electricity, gas, solid and liquid fuels; the historical trend in energy management techniques is in favour of this hard technical proposal, because experience there exists on methods of transmission or transportation of previous kinds of energy vectors mentioned, and small changes in lifestyles toward energy conservation have to be considered in the final uses of the energy. Less hard system technologies will permit direct heat and electricity production close to the channels of energy consumptions; these systems will function as energy savers and their full exploitation implies greater impacts on energy use and lifestyles. As a general trend for government policies as well as for public decision impact on the social decision process, the proliferation of solar systems would permit to produce energy for the 'flowing energetic consumptions' (civil, transportation, agriculture, telecommunications, lighting, etc.) while the not renewable fuels could be properly invested in the production of strategic or durable materials; in this scheme the role of renewable resources is well defined to stabilize the whole civil system in which we are at present organized.

  8. Option managing for radioactive metallic waste from the decommissioning of Kori Unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Kessel, David S.; Kim, Chagn Lak [KEPCO International Nuclear Graduate School (KINGS), Ulsan (Korea, Republic of)

    2017-06-15

    The purpose of this paper is to evaluate several leading options for the management of radioactive metallic waste against a set of general criteria including safety, cost effectiveness, radiological dose to workers and volume reduction. Several options for managing metallic waste generated from decommissioning are evaluated in this paper. These options include free release, controlled reuse, and direct disposal of radioactive metallic waste. Each of these options may involve treatment of the metal waste for volume reduction by physical cutting or melting. A multi-criteria decision analysis was performed using the Analytic Hierarchy Process (AHP) to rank the options. Melting radioactive metallic waste to produce metal ingots with controlled reuse or free release is found to be the most effective option.

  9. Technical evaluation of RETS-required reports for Rancho Seco Nuclear Generating Station, Unit 1 for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review of the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted during 1983 was performed. The periodic reports reviewed for the Rancho Seco Nuclear Generating Station, Unit 1 were the Semiannual Effluent Release Report, January 1, 1983 to June 30, 1983 and the Radiation Exposure, Environmental Protection, Effluent and Waste Disposal Report. The principal review guidelines were the plant's specific RETS which were based on NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  10. Determination of technical and economic parameters of an ionic transport membrane air separation unit working in a supercritical power plant

    Directory of Open Access Journals (Sweden)

    Kotowicz Janusz

    2016-09-01

    Full Text Available In this paper an air separation unit was analyzed. The unit consisted of: an ionic transport membrane contained in a four-end type module, an air compressor, an expander fed by gas that remains after oxygen separation and heat exchangers which heat the air and recirculated flue gas to the membrane operating temperature (850 °C. The air separation unit works in a power plant with electrical power equal to 600 MW. This power plant additionally consists of: an oxy-type pulverized-fuel boiler, a steam turbine unit and a carbon dioxide capture unit. Life steam parameters are 30 MPa/650 °C and reheated steam parameters are 6 MPa/670 °C. The listed units were analyzed. For constant electrical power of the power plant technical parameters of the air separation unit for two oxygen recovery rate (65% and 95% were determined. One of such parameters is ionic membrane surface area. In this paper the formulated equation is presented. The remaining technical parameters of the air separation unit are, among others: heat exchange surface area, power of the air compressor, power of the expander and auxiliary power. Using the listed quantities, the economic parameters, such as costs of air separation unit and of individual components were determined. These quantities allowed to determine investment costs of construction of the air separation unit. In addition, they were compared with investment costs for the entire oxy-type power plant.

  11. Disposal options for disused radioactive sources

    International Nuclear Information System (INIS)

    2005-01-01

    This report presents a review of relevant information on the various technical factors and issues, as well as approaches and relevant technologies, leading to the identification of potential disposal options for disused radioactive sources. The report attempts to provide a logical 'road map' for the disposal of disused radioactive sources, taking into consideration the high degree of variability in the radiological properties of such types of radioactive waste. The use of borehole or shaft type repositories is highlighted as a potential disposal option, particularly for those countries that have limited resources and are looking for a simple, safe and cost effective solution for the disposal of their radioactive source inventories. It offers information about usage and characteristics of radioactive sources, disposal considerations, identification and screening of disposal options as well as waste packaging and acceptance criteria for disposal. The information provided in the report could be adapted or adopted to identify and develop specific disposal options suitable for the type and inventory of radioactive sources kept in storage in a given Member State

  12. Rooftop Solar Photovoltaic Technical Potential in the United States. A Detailed Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Gagnon, Pieter [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Melius, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Phillips, Caleb [National Renewable Energy Lab. (NREL), Golden, CO (United States); Elmore, Ryan [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-01-01

    How much energy could be generated if PV modules were installed on all of the suitable roof area in the nation? To answer this question, we first use GIS methods to process a lidar dataset and determine the amount of roof area that is suitable for PV deployment in 128 cities nationwide, containing 23% of U.S. buildings, and provide PV-generation results for a subset of those cities. We then extend the insights from that analysis to the entire continental United States. We develop two statistical models--one for small buildings and one for medium and large buildings--and populate them with geographic variables that correlate with rooftop's suitability for PV. We simulate the productivity of PV installed on the suitable roof area, and present the technical potential of PV on both small buildings and medium/large buildings for every state in the continental US. Within the 128 cities covered by lidar data, 83% of small buildings have a location suitable for a PV installation, but only 26% of the total rooftop area of small buildings is suitable for development. The sheer number of buildings in this class, however, gives small buildings the greatest technical potential. Small building rooftops could accommodate 731 GW of PV capacity and generate 926 TWh/year of PV energy, approximately 65% of rooftop PV's total technical potential. We conclude by summing the PV-generation results for all building sizes and therefore answering our original question, estimating that the total national technical potential of rooftop PV is 1,118 GW of installed capacity and 1,432 TWh of annual energy generation. This equates to 39% of total national electric-sector sales.

  13. Mixed waste management options

    International Nuclear Information System (INIS)

    Owens, C.B.; Kirner, N.P.

    1992-01-01

    Currently, limited storage and treatment capacity exists for commercial mixed waste streams. No commercial mixed waste disposal is available, and it has been estimated that if and when commercial mixed waste disposal becomes available, the costs will be high. If high disposal fees are imposed, generators may be willing to apply extraordinary treatment or regulatory approaches to properly dispose of their mixed waste. This paper explores the feasibility of several waste management scenarios and management options. Existing data on commercially generated mixed waste streams are used to identify the realm of mixed waste known to be generated. Each waste stream is evaluated from both a regulatory and technical perspective in order to convert the waste into a strictly low-level radioactive or a hazardous waste. Alternative regulatory approaches evaluated in this paper include a delisting petition) no migration petition) and a treatability variance. For each waste stream, potentially available treatment options are identified that could lead to these variances. Waste minimization methodology and storage for decay are also considered. Economic feasibility of each option is discussed broadly. Another option for mixed waste management that is being explored is the feasibility of Department of Energy (DOE) accepting commercial mixed waste for treatment, storage, and disposal. A study has been completed that analyzes DOE treatment capacity in comparison with commercial mixed waste streams. (author)

  14. Record of Technical Change No.2 for ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada''

    International Nuclear Information System (INIS)

    1999-01-01

    This Record of Technical Change provides updates to the technical information included in ''Corrective Action Investigation Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada.''

  15. Integrated and holistic suitability assessment of recycling options for masonry rubble

    Science.gov (United States)

    Herbst, T.; Rübner, K.; Meng, B.

    2012-04-01

    Our industrial society depends on continuous mining and consumption of raw materials and energy. Besides, the building sector causes one of the largest material streams in Germany. On the one hand, the building sector is connected with a high need in material and energetic resources as well as financial expenditures. On the other hand, nearly 50 % of the volume of waste arises from the building industry. During the last years, the limitation of natural resources, increasing negative environmental consequences as well as rising prices and shortages of dump space have led to a change in thinking in the building and waste industry to a closed substance cycle waste management. In consideration of the production figures of the main kinds of masonry units (clay bricks, sand-lime bricks, autoclaved aerated concrete brick, concrete blocks), a not unimportant quantity of masonry rubble (including gypsum plaster boards, renders, mortars and mineral insulating materials) of more than 20 million tons per year is generated in the medium term. With regard to a sustainable closed substance cycle waste management, these rest masses have to be recycled if possible. Processed aggregates made from masonry rubble can be recycled in the production of new masonry units under certain conditions. Even carefully deconstructed masonry units can once more re-used as masonry units, particularly in the area of the preservation of monuments and historical buildings. In addition, masonry rubble in different processing qualities is applied in earth and road construction, horticulture and scenery construction as well as concrete production. The choice of the most suitable recycling option causes technical, economical and ecological questions. At present, a methodology for a comprehensive suitability assessment with a passable scope of work does not exist. Basic structured and structuring information on the recycling of masonry rubble is absent up to now. This as well as the economic and technical

  16. Management options for food production systems affected by a nuclear accident. Task 2 options for minimising the production of contaminated milk

    CERN Document Server

    Smith, J G; Mercer, J A; Nisbet, A F; Wilkins, B T

    2002-01-01

    This report describes an evaluation of three possible means by which the production of waste milk could be reduced following a nuclear accident. The three options studied are the reduction of contaminated pasture in the diet, the drying off of lactating dairy cattle and the slaughter of dairy cattle. The practicability of each of these is considered using criteria such as technical feasibility, capacity, cost, impact and acceptability, where appropriate. In theory reductions in waste milk arisings can be achieved with each option, however, there are a number of limitations associated with their practical application.

  17. Ageing management technical information investigations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    In February 2013, there are 50 units of commercial nuclear power plants (NPPs) in Japan. We enter into a period that 20 units of them are operating for more than 30 years. Currently, regulation imposes utilities to conduct ageing technical evaluations of each unit before operation of 30 years from the commissioning, to develop the long term maintenance management policy for next 10 years and to submit to the regulatory authority the policy with the report on ageing management technical evaluation (AMTE) for each NPP. It is necessary for regulatory side to develop technical information bases incorporating latest technical knowledge as operating experiences in domestic and abroad on ageing of the plants necessary to conduct reviews of AMTE for each unit. Based on these standpoints, technical information bases investigations have been conducted from the viewpoints of material degradation of ageing NPPs. In order to develop scientific regulator judgment bases related to ageing management (AM) and long-term operation (LTO), investigations on latest information on ageing management in domestic and abroad are conducted and a set of documents including technical evaluation review manuals necessary to conduct AMTE are prepared. To utilize the results of the investigations for ageing technical evaluation, database including latest information related to AM and LTO are developed, ran and operated. In addition, investigations related to Fugen nuclear plant, under decommissioning plants, investigations on mechanism of stress corrosion cracking (SCC), thermal ageing and preventive technologies for SCC, detection and diagnosis technology for ageing degradation and condition monitoring technology are performed to validate and confirm effectiveness of the technologies. (author)

  18. Technical evaluation of RETS-required reports for Crystal River Nuclear Generating Plant, Unit 3, for 1983

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.

    1985-01-01

    A review was performed on the reports required by Federal regulations and the plant-specific Radiological Effluent Technical Specifications (RETS) for operations conducted at Florida Power Corporation's Crystal River Nuclear Plant, Unit 3, during 1983. The three periodic reports reviewed were (1) the Effluent and Waste Disposal Semiannual Report, January 1-June 30, 1983, (2) the Effluent and Waste Disposal Semiannual Report, July 1-December 31, 1983, and (3) the Annual Environmental Operating Report, Radiological, 1983. The principal review guidelines were the plant's specific RETS and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  19. Portability of Technical Skills Across Occupations

    OpenAIRE

    Mukuni, Joseph Siloka

    2012-01-01

    In the literature, much has been reported about skill shortages in the labor market and many solutions have been suggested but most of them do not appear to work well for developing countries. This study investigated the place of portable technical skills as an option for addressing skill shortages, particularly in developing countries. The objective of the study was to determine whether different occupations have portable technical skills, which graduates of workforce development programs ca...

  20. Analysis of Thermal Design of Heating Units with Meteorological Climate Peculiarities

    Science.gov (United States)

    Seminenko, A. S.; Elistratova, Y. V.; Pererva, M. I.; Moiseev, M. V.

    2018-03-01

    This article is devoted to the analysis of thermal design of heating units, one of the compulsory calculations of heating systems, which ensures their stable and efficient operation. The article analyses the option of a single-pipe heating system with shifted end-capping areas and the overhead supply main; the difference is shown in the calculation results between heat balance equation of the heating unit and calculation of the actual heat flux (heat transfer coefficient) taking into account deviation from the standardized (technical passport) operating conditions. The calculation of the thermal conditions of residential premises is given, the deviation of the internal air temperature is shown taking into account the discrepancy between the calculation results for thermal energy.

  1. 24 CFR 982.634 - Homeownership option: Maximum term of homeownership assistance.

    Science.gov (United States)

    2010-04-01

    ... VOUCHER PROGRAM Special Housing Types Homeownership Option § 982.634 Homeownership option: Maximum term of... unit during the time that homeownership payments are made; or (2) Is the spouse of any member of the household who has an ownership interest in the unit during the time homeownership payments are made. (c...

  2. Position adopted by the government about the safety options of the EPR reactor project; Prise de position du gouvernement concernant les options de surete du projet de reacteur EPR

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-10-01

    On September 28, 2004, on behalf of the French ministers in charge of nuclear safety, the general director of nuclear safety and radiation protection addressed to the president of Electricite de France (EdF) a letter presenting the government's position about the safety options of the EPR (European Pressurized Reactor) project. On the basis of the examination carried out by the nuclear safety authority (ASN) and by the permanent group of reactor experts, the government has considered these options as satisfactory with respect to the safety improvement objectives. Therefore, the government requested EdF to comply with these technical rules for any future reactor development. This dossier includes: the letter of the government, the technical directives for the design and construction of the next generation of PWR-type reactors, the technical rules relative to the design of the main primary and secondary coolant circuits of PWR-type reactors, and the technical file about the safety of the EPR project reprinted from the 2003 report of nuclear safety and radiation protection authority. (J.S.)

  3. Greenhouse gas abatement in Senegal. A case study of least-cost options

    International Nuclear Information System (INIS)

    Amous, S.; Revet, D.; Sokona, Y.

    1994-01-01

    The first stage of the study was to make a preliminary inventory of greenhouse gas (GHG) emissions for the base year 1988. Following this seven no regret technical options for emission reduction were investigated and the costs calculated, allowing the identification of three least-cost options. The three least-cost options must be implemented first because of their negative costs. The economic benefits of both abatement scenarios are characterized by a negative global cost whatever the discount rate is. (author)

  4. Towards common technical standards

    International Nuclear Information System (INIS)

    Rahmat, H.; Suardi, A.R.

    1993-01-01

    In 1989, PETRONAS launched its Total Quality Management (TQM) program. In the same year the decision was taken by the PETRONAS Management to introduce common technical standards group wide. These standards apply to the design, construction, operation and maintenance of all PETRONAS installations in the upstream, downstream and petrochemical sectors. The introduction of common company standards is seen as part of an overall technical management system, which is an integral part of Total Quality Management. The Engineering and Safety Unit in the PETRONAS Central Office in Kuala Lumpur has been charged with the task of putting in place a set of technical standards throughout PETRONAS and its operating units

  5. Technical challenges in the qualitative ecological risk assessments performed on the Hanford Site operable units

    International Nuclear Information System (INIS)

    Probasco, K.M.

    1994-01-01

    Qualitative Risk Assessments (QRAS) have been selected as the method for providing the risk-driver indications for interim, remedial, and cleanup actions for the Hanford Site operable units' ecological risk assessments. This expedited response action path has been developed for the Hanford Site to facilitate time-critical decisions and generate immediate emergency cleanup actions. Tight budgets and aggressive time schedules are a major factor in the development of the QRA process. The QRA is a quick way to find immediate threats and a good precursor to a full risk assessment. However, numerous technical challenges have been identified with the QRA approach. The QRA approach differs from a baseline risk assessment in several ways. The main differences involve the use of data that have previously been gathered from the site, and the development of a ''bias-for-action'' document that would reveal qualitative risks from the contaminants identified at the operable units. Technical challenges concerning the ecological portion of these QRAs have raised questions about using the ORA for decision-making and may have weakened the validity of its use in the established procedural framework. Challenges involving such issues as the extrapolation of the contaminant data, data validation and screening techniques, receptor selections, and the final risk characterization outcome threaten the feasibility of the QRA as a decision-making tool. This discussion provides insight into resolving technical challenges and may be a ''lessons-learned'' device for those interested in the QRA approach. Ultimately, these challenges are proving to be learning tools for scientists, regulators, and ecologists and are identifying the data gaps and research direction for future ecological baseline risk assessments

  6. Technical opportunities to reduce global anthropogenic emissions of nitrous oxide

    Science.gov (United States)

    Winiwarter, Wilfried; Höglund-Isaksson, Lena; Klimont, Zbigniew; Schöpp, Wolfgang; Amann, Markus

    2018-01-01

    We describe a consistent framework developed to quantify current and future anthropogenic emissions of nitrous oxide and the available technical abatement options by source sector for 172 regions globally. About 65% of the current emissions derive from agricultural soils, 8% from waste, and 4% from the chemical industry. Low-cost abatement options are available in industry, wastewater, and agriculture, where they are limited to large industrial farms. We estimate that by 2030, emissions can be reduced by about 6% ±2% applying abatement options at a cost lower than 10 €/t CO2-eq. The largest abatement potential at higher marginal costs is available from agricultural soils, employing precision fertilizer application technology as well as chemical treatment of fertilizers to suppress conversion processes in soil (nitrification inhibitors). At marginal costs of up to 100 €/t CO2-eq, about 18% ±6% of baseline emissions can be removed and when considering all available options, the global abatement potential increases to about 26% ±9%. Due to expected future increase in activities driving nitrous oxide emissions, the limited technical abatement potential available means that even at full implementation of reduction measures by 2030, global emissions can be at most stabilized at the pre-2010 level. In order to achieve deeper reductions in emissions, considerable technological development will be required as well as non-technical options like adjusting human diets towards moderate animal protein consumption.

  7. NHTSA's Office of Defects Investigation (ODI) - Technical Service Bulletins System (TSBS) - Downloadable file

    Data.gov (United States)

    Department of Transportation — The Technical Service Bulletins data contains summaries of the Manufacturers' Technical Service Bulletins by single year, make and model. An optional item of Vehicle...

  8. Technical Specifications, Clinton Power Station, Unit No. 1 (Docket No. 50-461). Appendix ''A'' to License No. NPF-55

    International Nuclear Information System (INIS)

    1986-09-01

    This report presents information on the technical specifications of the Clinton Unit No. 1 Reactor in the areas of: safety limits and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls

  9. Technical Specifications, Seabrook Station, Unit 1 (Docket No. 50-443): Appendix ''A'' to License No. NPF-67

    International Nuclear Information System (INIS)

    1989-05-01

    The Seabrook Station, Unit 1 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  10. Dismantling of civilian nuclear powered fleet technical support vessels. engineering solutions - 59386

    International Nuclear Information System (INIS)

    Kulikov, Konstantin N.; Nizamutdinov, Rinat A.; Abramov, Andrey N.

    2012-01-01

    At the present time six nuclear technical support vessels are operated and maintained by Atomflot. Two of them (Volodarsky FTB (floating technical base) and Lepse FTB) were taken out of service for decommissioning and are stored afloat. One more vessel Lotta FTB should be decommissioned during next two years. The nuclear technological support ships carrying spent nuclear fuel (SNF), liquid and solid radioactive wastes (LRW and SRW) appear to be a possible radiation contamination of Murmansk region and Kola Bay because the Ship long-term storage afloat has the negative effect on hull's structures technical condition. As a result of this in the context of the Federal Program 'Nuclear and Radiation Safety' (2008-2015) NIPTB Onega OAO was engaged by state corporation Rosatom to develop the dismantling procedure for Volodarsky FTB and Lotta FTB. Before developing of nuclear technological support ships decommissioning projects the technical and economic assessment of decommissioning/dismantling was carried out. The following options were examined: - formation of module as one-piece Ship's hull for long-term storage at Saida Bay; - formation of separated modules for long-term storage at Saida Bay; - complete dismantling of hull's structures, systems and equipment with packing all generated SRW into certified long-term storage containers. This paper contains description of options, research procedure, comparative analysis of options of decommissioning and dismantling (D and D) of nuclear technological support ships and its difference with dismantling of nuclear submarine. On the basis of the technical and economic assessment of FTB D and D options the least expensive on the first D and D stage and the least duration option is the option 1 (Formation of module as one-piece Ship's hull for long-term storage at Saida Bay). By the implementation of the given option there will be the need of large areas for modules storage at Saida Bay. It was not considered while working out

  11. Municipal waste processing: Technical/economic comparison of composting and incineration options

    International Nuclear Information System (INIS)

    Bertanza, G.

    1993-01-01

    The first part of this paper which assessed the state-of-the-art of municipal waste composting and incineration technologies indicated that the advanced level of available technologies in this field now allows the realization of reliable and safe plants. This second part of the paper deals with the economics of the composting and incineration options. Cost benefit analyses using the discounted cash flow method are made for waste processing plants featuring composting alone, incineration only and mixed composting and incineration. The economic analyses show that plants employing conventional composting techniques work well for the case of exclusively organic waste materials. Incineration schemes are shown to be economically effective when they incorporate suitable energy recovery systems. The integrated composting-incineration waste processing plant appears to be the least attractive option in terms of economics. Current R ampersand D activities in this field are being directed towards the development of systems with lower environmental impacts and capital and operating costs

  12. Proposed design modifications and technical specification changes on grid voltage degradation for the Point Beach Nuclear Plant, Units 1 and 2 (Docket Nos. 50-266 and 50-301). Technical evaluation report

    International Nuclear Information System (INIS)

    White, R.L.

    1981-01-01

    This report documents the technical evaluation of the proposed design mofifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the Point Beach Nuclear Plant, Units 1 and 2. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation compares the submittals made by the licensee with the NRC staff positions and the review criteria and presents the reviewer's conclusion on the acceptability of the proposed system

  13. A conservation ontology and knowledge base to support delivery of technical assistance to agricultural producers in the united states

    Science.gov (United States)

    Information systems supporting the delivery of conservation technical assistance by the United States Department of Agriculture (USDA) to agricultural producers on working lands have become increasingly complex over the past 25 years. They are constrained by inconsistent coordination of domain knowl...

  14. Technical challenges for dismantlement verification

    International Nuclear Information System (INIS)

    Olinger, C.T.; Stanbro, W.D.; Johnston, R.G.; Nakhleh, C.W.; Dreicer, J.S.

    1997-01-01

    In preparation for future nuclear arms reduction treaties, including any potential successor treaties to START I and II, the authors have been examining possible methods for bilateral warhead dismantlement verification. Warhead dismantlement verification raises significant challenges in the political, legal, and technical arenas. This discussion will focus on the technical issues raised by warhead arms controls. Technical complications arise from several sources. These will be discussed under the headings of warhead authentication, chain-of-custody, dismantlement verification, non-nuclear component tracking, component monitoring, and irreversibility. The authors will discuss possible technical options to address these challenges as applied to a generic dismantlement and disposition process, in the process identifying limitations and vulnerabilities. They expect that these considerations will play a large role in any future arms reduction effort and, therefore, should be addressed in a timely fashion

  15. Management options for food production systems affected by a nuclear accident. Task 2: options for minimising the production of contaminated milk

    International Nuclear Information System (INIS)

    Smith, J.G.; Nisbet, A.F.; Mercer, J.A.; Brown, J.; Wilkins, B.T.

    2002-01-01

    This report describes an evaluation of three possible means by which the production of waste milk could be reduced following a nuclear accident. The three options studied are the reduction of contaminated pasture in the diet, the drying off of lactating dairy cattle and the slaughter of dairy cattle. The practicability of each of these is considered using criteria such as technical feasibility, capacity, cost, impact and acceptability, where appropriate. In theory reductions in waste milk arisings can be achieved with each option, however, there are a number of limitations associated with their practical application. (author)

  16. Benefit/cost analysis of plutonium recycle options in the United States

    International Nuclear Information System (INIS)

    Lowenberg, H.; Burnham, J.B.; Fisher, F.; Ray, W.H.

    1977-01-01

    Predictable effects of the recycle of plutonium and uranium recovered from spent LWR fuels were assessed in a final environmental statement (GESMO). Five alternative dispositions of LWR-produced plutonium ranging from prompt recycle of recovered plutonium and uranium to no recovery and no recycle are compared. The assessments consider cumulative effects for the period 1975 through 2000, and are centered on a conservative low growth rate resulting in about 500 LWR's in the U.S. in 2000. A more optimistic growth projection resulting in about 800 LWR's in 2000 is also analyzed in order to assess the effects of industry size upon the impacts. Demands for fuel cycle services were calculated with an ERDA program, NUFUEL, which was modified to include penalties for 236 U and 242 Pu. Unit cost data, including a simulation of market place reaction to supply-demand functions for uranium costs, were combined with the NUFUEL demand data in an economics code, NUCOST. Environmental impacts were also based upon NUFUEL demand data and were developed using a model plant industry concept. Using the most likely unit costs with a 10% discount rate, present worth incentives for prompt recycle over no recycle of $3.2 billion for the lower growth and about $6 billion for the higher growth were indicated. Present worth costs of delays in recycle of up to 5 years were less than $1 billion. Sensitivity of the economic assessments to unit cost variations and discount rates were also evaluated. Environmental impacts other than radiological were lowest for prompt Pu recycle and highest for no recycle. Radiological impacts for the total world wide total body exposure from U.S. industry for the 26 year period were estimated to be: - No recycle-8.2 million person-rem; U only recycle-9.5 million person-rem; Pu and U recycle-8.8 million person-rem. Comparison of the decreased radiological impact of the no recycle option with its increased costs relative to prompt plutonium recycle resulted in a

  17. Management options for recycling radioactive scrap metals

    Energy Technology Data Exchange (ETDEWEB)

    Dehmel, J.C.; MacKinney, J.; Bartlett, J.

    1997-02-01

    The feasibility and advantages of recycling radioactive scrap metals (RSM) have yet to be assessed, given the unique technical, regulatory, safety, and cost-benefit issues that have already been raised by a concerned recycling industry. As is known, this industry has been repeatedly involved with the accidental recycling of radioactive sources and, in some cases, with costly consequences. If recycling were deemed to be a viable option, it might have to be implemented with regulatory monitoring and controls. Its implementation may have to consider various and complex issues and address the requirements and concerns of distinctly different industries. There are three basic options for the recycling of such scraps. They are: (1) recycling through the existing network of metal-scrap dealers and brokers, (2) recycling directly and only with specific steelmills, or (3) recycling through regional processing centers. Under the first option, scrap dealers and brokers would receive material from RSM generators and determine at which steelmills such scraps would be recycled. For the second option, RSM generators would deal directly with selected steelmills under specific agreements. For the third option, generators would ship scraps only to regional centers for processing and shipment to participating steelmills. This paper addresses the potential advantages of each option, identifies the types of arrangements that would need to be secured among all parties, and attempts to assess the receptivity of the recycling industry to each option.

  18. Development of real options model for nuclear power plants

    International Nuclear Information System (INIS)

    Ono, Kenji

    2004-01-01

    As the Japanese electricity market is deregulated, it becomes more important for electric utilities to recognize their financial risks and to adopt strategic and scientific decision making methodology. We have developed two models for valuation of Japanese nuclear power plants to support utilities' decision making. One is a net present value (NPV) model using discounted cash flow analysis method. Another is a real options model. This model is based on strict financial technology theory and can calculate value of early retirement, life extension and new unit addition options of nuclear units under electricity price uncertainty. This can also derive an optimal period for retirement, life extension and new unit addition. (author)

  19. Risk-based economic decision analysis of remediation options at a PCE-contaminated site

    DEFF Research Database (Denmark)

    Lemming, Gitte; Friis-Hansen, P.; Bjerg, Poul Løgstrup

    2010-01-01

    by the remediation activities. More attention is increasingly being given to these secondary environmental impacts when evaluating remediation options. This paper presents a methodology for an integrated economic decision analysis which combines assessments of remediation costs, health risk costs and potential...... at a downstream groundwater well. Potential environmental impacts on the local, regional and global scales due to the site remediation activities are evaluated using life cycle assessments (LCA). The potential impacts on health and environment are converted to monetary units using a simplified cost model. A case......Remediation methods for contaminated sites cover a wide range of technical solutions with different remedial efficiencies and costs. Additionally, they may vary in their secondary impacts on the environment i.e. the potential impacts generated due to emissions and resource use caused...

  20. Impact of ITER liquid metal design options on safety level and licensing - Sweden

    International Nuclear Information System (INIS)

    Harfors, C.; Devell, L.; Johansson, Kjell; Lundell, B.; Rolandsson, S.

    1993-01-01

    The safety level and licensability of five design options for ITER coolant, breeding material and structural material are assessed, with emphasis on some specified accident scenarios. The safety level is assessed in terms of barrier requirements and the feasibility to construct and qualify such a barrier. The licensability in Sweden of each design option is assessed based on the indicated safety level and on a judgement of the technical feasibility to construct and qualify the ITER tokamak itself, based on the selected design option. 20 refs

  1. Nevada Transportation Options Study

    International Nuclear Information System (INIS)

    P. GEHNER; E.M. WEAVER; L. FOSSUM

    2006-01-01

    This study performs a cost and schedule analysis of three Nevada Transportation options that support waste receipt at the repository. Based on the U.S. Department of Energy preference for rail transportation in Nevada (given in the Final Environmental Impact Statement), it has been assumed that a branch rail line would be constructed to support waste receipt at the repository. However, due to potential funding constraints, it is uncertain when rail will be available. The three Nevada Transportation options have been developed to meet a varying degree of requirements for transportation and to provide cost variations used in meeting the funding constraints given in the Technical Direction Letter guidelines for this study. The options include combinations of legal-weight truck, heavy-haul truck, and rail. Option 1 uses a branch rail line that would support initial waste receipt at the repository in 2010. Rail transportation would be the primary mode, supplemented by legal weight trucks. This option provides the highest level of confidence in cost and schedule, lowest public visibility, greatest public acceptability, lowest public dose, and is the recommended option for support of waste receipt. The completion of rail by 2010 will require spending approximately $800 million prior to 2010. Option 2 uses a phased rail approach to address a constrained funding scenario. To meet funding constraints, Option 2 uses a phased approach to delay high cost activities (final design and construction) until after initial waste receipt in 2010. By doing this, approximately 95 percent of the cost associated with completion of a branch rail line is deferred until after 2010. To support waste receipt until a branch rail line is constructed in Nevada, additional legal-weight truck shipments and heavy-haul truck shipments (on a limited basis for naval spent nuclear fuel) would be used to meet the same initial waste receipt rates as in Option 1. Use of heavy-haul shipments in the absence

  2. Rejecting renewables: The socio-technical impediments to renewable electricity in the United States

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.

    2009-01-01

    If renewable power systems deliver such impressive benefits, why do they still provide only 3 percent of national electricity generation in the United States? As an answer, this article demonstrates that the impediments to renewable power are socio-technical, a term that encompasses the technological, social, political, regulatory, and cultural aspects of electricity supply and use. Extensive interviews of public utility commissioners, utility managers, system operators, manufacturers, researchers, business owners, and ordinary consumers reveal that it is these socio-technical barriers that often explain why wind, solar, biomass, geothermal, and hydroelectric power sources are not embraced. Utility operators reject renewable resources because they are trained to think only in terms of big, conventional power plants. Consumers practically ignore renewable power systems because they are not given accurate price signals about electricity consumption. Intentional market distortions (such as subsidies), and unintentional market distortions (such as split incentives) prevent consumers from becoming fully invested in their electricity choices. As a result, newer and cleaner technologies that may offer social and environmental benefits but are not consistent with the dominant paradigm of the electricity industry continue to face comparative rejection.

  3. Rejecting renewables. The socio-technical impediments to renewable electricity in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K. [Energy Governance Program, Centre on Asia and Globalisation, Lee Kuan Yew School of Public Policy, National University of Singapore (Singapore)

    2009-11-15

    If renewable power systems deliver such impressive benefits, why do they still provide only 3 percent of national electricity generation in the United States? As an answer, this article demonstrates that the impediments to renewable power are socio-technical, a term that encompasses the technological, social, political, regulatory, and cultural aspects of electricity supply and use. Extensive interviews of public utility commissioners, utility managers, system operators, manufacturers, researchers, business owners, and ordinary consumers reveal that it is these socio-technical barriers that often explain why wind, solar, biomass, geothermal, and hydroelectric power sources are not embraced. Utility operators reject renewable resources because they are trained to think only in terms of big, conventional power plants. Consumers practically ignore renewable power systems because they are not given accurate price signals about electricity consumption. Intentional market distortions (such as subsidies), and unintentional market distortions (such as split incentives) prevent consumers from becoming fully invested in their electricity choices. As a result, newer and cleaner technologies that may offer social and environmental benefits but are not consistent with the dominant paradigm of the electricity industry continue to face comparative rejection. (author)

  4. Rejecting renewables: The socio-technical impediments to renewable electricity in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.s [Energy Governance Program, Centre on Asia and Globalisation, Lee Kuan Yew School of Public Policy, National University of Singapore (Singapore)

    2009-11-15

    If renewable power systems deliver such impressive benefits, why do they still provide only 3 percent of national electricity generation in the United States? As an answer, this article demonstrates that the impediments to renewable power are socio-technical, a term that encompasses the technological, social, political, regulatory, and cultural aspects of electricity supply and use. Extensive interviews of public utility commissioners, utility managers, system operators, manufacturers, researchers, business owners, and ordinary consumers reveal that it is these socio-technical barriers that often explain why wind, solar, biomass, geothermal, and hydroelectric power sources are not embraced. Utility operators reject renewable resources because they are trained to think only in terms of big, conventional power plants. Consumers practically ignore renewable power systems because they are not given accurate price signals about electricity consumption. Intentional market distortions (such as subsidies), and unintentional market distortions (such as split incentives) prevent consumers from becoming fully invested in their electricity choices. As a result, newer and cleaner technologies that may offer social and environmental benefits but are not consistent with the dominant paradigm of the electricity industry continue to face comparative rejection.

  5. 75 FR 27986 - Electronic Filing System-Web (EFS-Web) Contingency Option

    Science.gov (United States)

    2010-05-19

    ...] Electronic Filing System--Web (EFS-Web) Contingency Option AGENCY: United States Patent and Trademark Office... contingency option when the primary portal to EFS-Web has an unscheduled outage. Previously, the entire EFS-Web system is not available to the users during such an outage. The contingency option in EFS-Web will...

  6. Valuation of exploration and production assets. An overview of real options models

    International Nuclear Information System (INIS)

    Dias, Marco Antonio Guimaraes

    2004-01-01

    This paper presents a set of selected real options models to evaluate investments in petroleum exploration and production (E and P) under market and technical uncertainties. First are presented some simple examples to develop the intuition about concepts like option value and optimal option exercise, comparing them with the concepts from the traditional net present value (NPV) criteria. Next, the classical model of Paddock, Siegel and Smith is presented, including a discussion on the practical values for the input parameters. The modeling of oil price uncertainty is presented by comparing some alternative stochastic processes. Other E and P applications discussed here are the selection of mutually exclusive alternatives under uncertainty, the wildcat drilling decision, the appraisal investment decisions, and the analysis of option to expand the production through optional wells

  7. The $2000 Electric Powertrain Option-1 Program. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report describes the tasks accomplished as part of Northrop Grumman's TRP $2000 Electric Powertrain Option-1 program. Northrop Grumman has strived to achieve technology advances and development considered as high priority to the success of future electric vehicles. Northrop Grumman has achieved the intent of the program by taking several steps toward reducing the cost of the electric vehicle powertrain, demonstrating technologies in the form of hardware and introducing enhancements into production that are consistent with the needs of the market.

  8. U.S. spent nuclear fuel management: Political, fiscal, and technical feasibility

    International Nuclear Information System (INIS)

    Singer, Clifford

    2013-01-01

    Successful U.S. spent nuclear fuel management policy must satisfy political, fiscal, and technical constraints. Technical requirements have been thoroughly investigated in the United States and Nordic countries for volcanic tuff, salt, and granite. Fiscal planning requires an inflation-adjusted revenue stream and predictable real interest rate earnings on fund balances. A prompt solution satisfying political constraints requires compromise between the overlapping but distinct goals of seven different sets of interests at the federal level. Absent such compromise, there will be delay until sufficient support for one of three strategies evolves: (1) force the Yucca Mountain repository on Nevada, (2) open a centralized storage facility without coupling to repository licensing, or (3) follow a “consent-based” process for repository licensing. Formulations of each of these strategies to overcome impediments to their success are described. - Highlights: • U.S. spent nuclear fuel policy has been at an impasse. • No compromise on Yucca Mountain is at hand. • Yucca only, new repository, or no repository are options. • Success with each is more likely with sounder financing

  9. Public Response to Wildfire: Is the Australian "Stay and Defend or Leave Early" Approach an Option for Wildfire Management in the United States?

    Science.gov (United States)

    Sarah M. McCaffrey; Alan Rhodes

    2009-01-01

    In the United States, the increasing costs and negative impacts of wildfires are causing fire managers and policymakers to reexamine traditional approaches to fire management including whether mass evacuation of populations threatened by wildfire is always the most appropriate option. This article examines the Australian "stay and defend or leave early" (SDLE...

  10. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  11. Some wind-energy storage options

    Energy Technology Data Exchange (ETDEWEB)

    Eldridge, F R; Ljungstroem, O [ed.

    1976-01-01

    Systems capable of storing energy generated from the wind can be categorized in terms of electrochemical energy storage systems, thermal energy storage systems, kinetic energy systems, and potential energy systems. Recent surveys of energy storage systems have evaluated some of these available storage technologies in terms of the minimum economic sizes for utility applications, estimated capital costs of these units, expected life, dispersed storage capabilities, and estimated turn-around efficiencies of the units. These are summarized for various types of energy storage options.

  12. Clinical prospective evaluation of zirconia-based three-unit posterior fixed dental prostheses: Up-to ten-year results.

    Science.gov (United States)

    Ioannidis, Alexis; Bindl, Andreas

    2016-04-01

    Only a few studies exist, which assess the clinical long-term behavior of all-ceramic FDPs in the posterior region. The aim of the present prospective clinical study was to evaluate the clinical performance of posterior three-unit FDPs manufactured from Y-TZP after a service period up to 10 years. 55 patients received 59 three-unit FDPs in the posterior region of the maxilla or mandible. Abutment teeth were prepared and full-arch impressions were taken. Definitive casts were fabricated and optically scanned. Frameworks were fabricated with computer-aided design (CAD) and manufacturing (CAM) technology. Y-TZP frameworks were veneered and adhesively luted to the abutment teeth. Baseline and follow-up examinations (service time: ≥ 48 months) were recorded by applying modified United States Public Health Services (USPHS) rating criteria. Cumulative survival rate was analyzed with Kaplan-Meier. Percentage of biological and technical complication was calculated. Fifty-three patients with 57 FDPs attended the last follow-up visit and a mean observation period of the remaining was 6.3 ± 1.9 years was calculated. Biological complications occurred in 17.5%, technical complications in 28% of the FDPs. The 10-year cumulative survival rate amounted 85.0%. Three FDPs failed to survive, two due to a root fracture of the abutment tooth and one due to secondary caries. Three-unit FDPs made from Y-TZP, veneered with ceramic offer a treatment option with a high rate of chipping. However, the manufacturing processes nowadays are modified in order to avoid this complication. The results of the present investigation suggest that three-unit Y-TZP posterior FDPs may are a possible treatment option. However, a high rate of chipping can be expected. Copyright © 2016. Published by Elsevier Ltd.

  13. Numeraire Invariance and application to Option Pricing and Hedging

    NARCIS (Netherlands)

    Jamshidian, F.; Vanmaele, Michèle; Deelstra, Griselda; De Schepper, Ann; Dhaene, Jan; Reynaerts, Huguette; Schoutens, Wim; Van Goethem, Paul

    2008-01-01

    Numeraire invariance is a well-known technique in option pricing and hedging theory. It takes a convenient asset as the numeraire, as if it were the medium of exchange, and expresses all other asset and option prices in units of this numeraire. Since the price of the numeraire relative to itself is

  14. Technical evaluation of RETS-required reports for Browns Ferry Nuclear Power Station, Units 1, 2, and 3, for 1983

    International Nuclear Information System (INIS)

    Young, T.E.; Magleby, E.H.

    1985-01-01

    A review was performed of reports required by federal regulations and the plant-specific radiological effluent technical specifications (RETS) for operations conducted at Tennessee Valley Authority's Browns Ferry Nuclear Station, Units 1, 2, and 3, during 1983. The two periodic reports reviewed were (a) the Effluents and Waste Disposal Semiannual Report, First Half 1983 and (b) the Effluents and Waste Disposal Semiannual Report, Second Half 1983. The principal review guidelines were the plant's specific RETs and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  15. Solar Access: Issues and Policy Options | State, Local, and Tribal

    Science.gov (United States)

    Governments | NREL Solar Access: Issues and Policy Options Solar Access: Issues and Policy Options June 06, 2017 by Alison Holm Distributed solar capacity in the United States is on the rise : approximately 2,580 megawatts (MW) of new residential solar photovoltaic (PV) capacity was brought online in

  16. Nuclear spent fuel management. Experience and options

    International Nuclear Information System (INIS)

    1986-01-01

    Spent nuclear fuel can be stored safely for long periods at relatively low cost, but some form of permanent disposal will eventually be necessary. This report examines the options for spent fuel management, explores the future prospects for each stage of the back-end of the fuel cycle and provides a thorough review of past experience and the technical status of the alternatives. Current policies and practices in twelve OECD countries are surveyed

  17. Assessment of technical risks and R and D requirements for a magnetic confinement fusion fuel system. Final report

    International Nuclear Information System (INIS)

    DeFreece, D.A.

    1983-11-01

    This report documents a specific use and results of a novel technique for assessing the technical risks associated with the hardware development of a possible future commercial fusion power plant fuel system. Technical risk is defined as the risk that a particular technology or component which is currently under development will not achieve a set of required technical specifications. A technical risk assessment is the quantification of this risk. This Technical Risk Assessment (TRA) methodology was applied to a deuterium-tritium fuel system for a magnetic-confinement fusion power plant. The fuel system is defined to support a generic commercial reactor with at least two viable options for each critical subsystem. Each subsystem option is defined in detail including nominal performance requirements and subsystem interfaces. Subsystem experts were canvassed to obtain values for past, present and future technical performance parameters for each of the subsystem options. These forecasts are presented as probabilities of achieving given levels of performance in specific time periods for assumed funding scenarios. Several funding scenarios were examined to discern whether performance limitations are caused by funding or technology. A computerized Fuel System simulation is described which uses these subsystem performance parameter forecasts as inputs

  18. TMI abnormal wastes disposal options

    International Nuclear Information System (INIS)

    Ayers, A.L. Jr.

    1984-03-01

    A substantial quantity of high beta-gamma/high-TRU contaminated wastes are expected from cleanup activities of Unit 2 of the Three Mile Island Nuclear Power Station. Those wastes are not disposable because of present regulatory constraints. Therefore, they must be stored temporarily. This paper discusses three options for storage of those wastes at the Idaho National Engineering Laboratory: (1) storage in temporary storage casks; (2) underground storage in vaults; and (3) storage in silos at a hot shop. Each option is analyzed and evaluated. Also included is a discussion of future disposal strategies, which might be pursued when a suitable federal or commercial repository is built

  19. Study of technical and economical feasibility for implementation of a movable unit for treatment of industrial effluents with electron beam

    International Nuclear Information System (INIS)

    Rela, Carolina Sciamarelli

    2006-01-01

    The treatment of industrial effluents is a practice that is disseminating in accelerated rhythm, of contributing to reinforce the public image, through the combat of the pollution, it brings economical advantages allowing the companies the reuse of the treated water in their own processes. The liquid effluent treatment technique studied in the present work is the one that uses the chemical oxidation/reduction standing out the use of the electron beam (e.b.) radiation. This technique uses an advanced oxidation process, generating radicals highly reagents that provoke the oxidation, reduction, dissociation and degradation in composed organic and exercising lethal effect in general in the microorganisms and parasites. In this work a conceptual and basic project of a movable unit of effluents treatment using electron beam radiation process was developed, in order that the unit moves until the treatment point, where the effluent is produced, facilitating the logistics. A technical and economical feasibility study was also elaborated allowing data on the capacity and cost of effluents processing to consolidate the values of the necessary investments to be presented to foundations organs for the construction of a movable unit. The results of the studies demonstrated that it is technically viable attending the pertinent legislation of Brazil, in the aspects of Radiation Protection and transport limit capacity. The unitary cost of the e.b. radiation processing in the movable unit was shown more expensive than in the fixed unit, the reason is the decrease of the efficiency of the interaction of the incident electrons in the effluent, due to the reduction of electron energy operation time of the unit. (author)

  20. Technical Specifications: Clinton Power Station, Unit No. 1 (Docket No. 50-461): Appendix ''A'' to License No. NPF-62

    International Nuclear Information System (INIS)

    1987-04-01

    The Clinton Power Station, Unit No. 1 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public

  1. Savannah River Plant Low-Level Waste Heat Utilization Project preliminary analysis. Volume II. Options for capturing the waste heat

    International Nuclear Information System (INIS)

    1978-11-01

    Options for utilizing the heated SRP effluent are investigated. The temperature and availability characteristics of the heated effluent are analyzed. Technical options for energy recovery are discussed. A number of thermodynamic cycles that could generate electrical power using the energy in the heated SRP effluent are described. Conceptual designs for SRP application of two attractive options are presented. Other direct uses for the heated effluent, as heat sources for agriculture and aquaculture options are discussed

  2. Selection of a new nuclear unit for Slovakia: possibilities and key technical issues

    International Nuclear Information System (INIS)

    Misak, J.

    2009-01-01

    Plans for construction of new nuclear unit at Jaslovske Bohunice brings forward the issue of selection of reactor design. This paper compares technical characteristics (safety and operational) of pressurized water reactors that are at present available in the market, such as AP 1000 (WEC), EPR (AREVA), AES 2006 (ASE), APWR 1700 (Mitsubishi) and APR 1400 (Korea Hydro and Nuclear). Selected parameters that require close attention in future negotiations with potential suppliers are discussed in detail. Compared are parameters as type of the reactor, reactor output power, quantified level of safety, compliance with national legislature and international safety requirements, operational flexibility in meeting requirements of the grid, using of verified technology, measures for coping with severe accidents, resistance against extreme external conditions etc. (authors)

  3. United States: Ukraine Technical Exchange II trip report

    International Nuclear Information System (INIS)

    Moak, D.J.; Wendling, M.A.

    1995-02-01

    May 15--21, 1994, the first technical conference was held at Hanford between Ukraine-Chornobyl, Westinghouse Hanford, and SAIC, to exchange technical information and experience gained in cleanup and stabilization of radioactive contamination at Hanford and Chornobyl. Protocol was signed for a second exchange and technology demonstration program in Kiev and near Chornobyl power plants. Technical Exchange No. 2 was held from August 28--September 9, 1994, with 3 focus areas: field demonstration of DOE-Hanford technologies and application to cleanup of contaminated lands resulting from 1986 Chornobyl accident; application of other US DOE-technologies; and observation/evaluation of Ukraine-developed technologies for potential application in USA. Three radiological mapping systems were demonstrated near Chornobyl: man-carried Ultrasonic Ranging and Data System, a mobile radiological data system, and NOMAD field gamma spectroscopy system. The Ukraine-Chornobyl team hosted technical presentations, discussions and field trips for 4.5 days, providing insight on the Chornobyl problem and allowing the US team to present overviews on DOE technologies that may be applicable to the Chornobyl situation. It is concluded that Ukrainian scientists have tremendous talent and expended considerable energy in attempting to tackle such a problem, but economic and cultural conditions with Ukraine have prevented them from acquiring the resources to implement basic aspects of characterization and remediation activities. Most of their publications are in Russian only. Their translation, plus resources to carry out proposals for bench scale and field demonstration projects, could benefit the DOE complex and other nuclear programs. The considerable cultural and economic change occurring in Ukraine, is providing opportunities for private industries to assist in the changes and for DOE, others to apply cleanup technologies, and it is essential that close institutional relations be established

  4. Learning from the implementation of residential optional time of use pricing in the United States electricity industry

    Science.gov (United States)

    Li, Xibao

    Residential time-of-use (TOU) rates have been in practice in the U.S. since the 1970s. However, for institutional, political, and regulatory reasons, only a very small proportion of residential customers are actually on these schedules. In this thesis, I explore why this is the case by empirically investigating two groups of questions: (1) On the "supply" side: Do utilities choose to offer TOU rates in residential sectors on their own initiative if state commissions do not order them to do so? Since utilities have other options, what is the relationship between the TOU rate and other alternatives? To answer these questions, I survey residential tariffs offered by more than 100 major investor-owned utilities, study the impact of various factors on utilities' rate-making behavior, and examine utility revealed preferences among four rate options: seasonal rates, inverted block rates, demand charges, and TOU rates. Estimated results suggest that the scale of residential sectors and the revenue contribution from residential sectors are the only two significant factors that influence utility decisions on offering TOU rates. Technical and economic considerations are not significant statistically. This implies that the little acceptance of TOU rates is partly attributed to utilities' inadequate attention to TOU rate design. (2) On the "demand" side: For utilities offering TOU tariffs, why do only a very small proportion of residential customers choose these tariffs? What factors influence customer choices? Unlike previous studies that used individual-level experimental data, this research employs actual aggregated information from 29 utilities offering optional TOU rates. By incorporating neo-classical demand analysis into an aggregated random coefficient logit model, I investigate the impact of both price and non-price tariff characteristics and non-tariff factors on customer choice behavior. The analysis indicates that customer pure tariff preference (which captures the

  5. THE REAL OPTIONS OF CAPITAL BUDGET

    Directory of Open Access Journals (Sweden)

    Antonio Lopo Martins

    2008-07-01

    Full Text Available The traditional techniques of capital budget, as the deducted cash flow and the net value present, do not incorporate existing flexibilities in an investment project, they tend to distort the value of certain investments, mainly those that are considered in scenes of uncertainty and risk. Therefore, this study intends to demonstrate that the Real Options Theory (TOR is a useful methodology to evaluate and to indicate the best option for project of expansion investment. To reach the considered objective the procedure method was used a case study, having as unit of case the Resort Praia Hotel do Litoral Norte of Salvador. This study was developed of the following form: first it identified the traditional net value present and later it was incorporated the volatileness of each analyzed uncertainty. Second, as the real options are analogous to the financial options, it was necessary to identify elements that composed the terminologies of the financial options with intention to get the value of the real option. For this model of options pricing of Black & Scholes jointly with a computational simulator was used (SLS to get the expanded net value present. As a result of this study it was possible to evidence that using the traditional tool of capital budget Net Value Present (VPL is negative, therefore the project of expansion of the Hotel would be rejected. While for the application of methodology TOR the project presents positive Expanded Present Value which would represent an excellent chance of investment. Key-word: Capital budget, Real options, Analysis of investments.

  6. Endovascular therapy options in femoro-popliteal PAD; Endovaskulaere Therapieoptionen bei femoropoplitealer pAVK

    Energy Technology Data Exchange (ETDEWEB)

    Brechtel, Klaus [Universitaetsklinikum Tuebingen (Germany). Abt. fuer Diagnostische und Interventionelle Radiologie

    2010-09-15

    The endovascular treatment of femoro-popliteal PAD is still challenging. The number of endovascular procedures in this vessel segment has increased over the past years. Despite new technologies, the outcome of endovascular therapy in terms of durability is still weak. In the meantime, the latest developments are progressing, such as the combination of mechanical angioplasty and drug delivery. Additionally, there are former techniques, such as debulking by atherectomy, which have been technically improved and now contribute to modern concepts of endovascular treatment. This article provides an overview on treatment indications and technical options including the latest technical developments. (orig.)

  7. Multi-criteria evaluation for CHP system options

    International Nuclear Information System (INIS)

    Pilavachi, P.A.; Roumpeas, C.P.; Minett, S.; Afgan, N.H.

    2006-01-01

    Several Combined Heat and Power (CHP) system options have been considered for evaluation with respect to the end-user requirements. These included Internal Combustion Engines (Otto and Diesel), Gas Turbines, Steam Turbines and Combined Cycles covering a wide range of electrical output. Data have been obtained from literature and the CHP systems have been evaluated using different criteria such as overall efficiency, investment cost, fuel cost, electricity cost, heat cost, CO 2 production and footprint. A multi-criteria method is used with an agglomeration function based on the statistical evaluation of weight factors. The technical, economic and social aspects of each system have been evaluated in an integrated manner and the results have been compared by means of the Sustainability Index. Based on the above criteria and depending on the user requirements, the best CHP system options have been established

  8. The Agency's technical co-operation programme with the United Arab Emirates 1984-1994 country programme summaries

    International Nuclear Information System (INIS)

    1994-01-01

    This report contains a review of the Agency's technical co-operation activities in the United Arab Emirates carried out during 1984-1994. In terms of coverage and analytical depth, country programmes summaries stand somewhere midway between in-depth country programme evaluations and individual project evaluations. They attempt to provide a comprehensive, descriptive picture of the Agency's co-operation with a Member State in a manner that will be particularly useful for programming decisions. The attempt is very much to describe - largely through statistical data - not to provide independent analysis and evaluation

  9. Designing flexible engineering systems utilizing embedded architecture options

    Science.gov (United States)

    Pierce, Jeff G.

    This dissertation develops and applies an integrated framework for embedding flexibility in an engineered system architecture. Systems are constantly faced with unpredictability in the operational environment, threats from competing systems, obsolescence of technology, and general uncertainty in future system demands. Current systems engineering and risk management practices have focused almost exclusively on mitigating or preventing the negative consequences of uncertainty. This research recognizes that high uncertainty also presents an opportunity to design systems that can flexibly respond to changing requirements and capture additional value throughout the design life. There does not exist however a formalized approach to designing appropriately flexible systems. This research develops a three stage integrated flexibility framework based on the concept of architecture options embedded in the system design. Stage One defines an eight step systems engineering process to identify candidate architecture options. This process encapsulates the operational uncertainty though scenario development, traces new functional requirements to the affected design variables, and clusters the variables most sensitive to change. The resulting clusters can generate insight into the most promising regions in the architecture to embed flexibility in the form of architecture options. Stage Two develops a quantitative option valuation technique, grounded in real options theory, which is able to value embedded architecture options that exhibit variable expiration behavior. Stage Three proposes a portfolio optimization algorithm, for both discrete and continuous options, to select the optimal subset of architecture options, subject to budget and risk constraints. Finally, the feasibility, extensibility and limitations of the framework are assessed by its application to a reconnaissance satellite system development problem. Detailed technical data, performance models, and cost estimates

  10. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Eggeman, Tim [ZeaChem Inc., Lakewood, CO (United States); O' Neill, Brian [ZeaChem Inc., Lakewood, CO (United States)

    2016-08-17

    ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was already in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors

  11. Technical specifications: Susquehanna Steam Electric Station, Unit No. 2 (Docket No. 50-388). Appendix A to License No. NPF-22

    International Nuclear Information System (INIS)

    1984-03-01

    Susquehanna Steam Electric Station, Unit 2 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  12. Technical specifications for Grand Gulf Nuclear Station, Unit 1 (Docket No. 50-416). Appendix A to License No. NPF-13

    International Nuclear Information System (INIS)

    1984-08-01

    The Grand Gulf Nuclear Station, Unit 1 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions and other requirements applicable to a nuclear facility as set forth in Section 50.36 of 10 CFR part 50 for the protection of the health and safety of the public

  13. The Agency's Technical Co-operation programme with the United Republic of Tanzania, 1982-1992. Country programme summaries

    International Nuclear Information System (INIS)

    1992-01-01

    The country programme summary reported here is one in the series of such studies being undertaken of the Agency's TC programme with Member States. With over $ 3.4 million of Agency support received, the United Republic of Tanzania ranks 44th among all recipients of technical assistance in the period 1958 - 1991. Almost half of the assistance during the past ten years has been provided in the form of equipment (49%), followed by training through fellowships and scientific visits (29%) and expert services (22%). Ninety-two per cent of the resources were provided by the Technical Assistance and Co-operation Fund, the rest was made available through assistance in kind (5%) and through extrabudgetary contributions (3%). With regard to project disbursement by sector, by far the largest share has gone to agriculture (48%), followed by nuclear physics (20%), nuclear safety (17%) and nuclear medicine (11%)

  14. Process to identify and evaluate restoration options

    International Nuclear Information System (INIS)

    Strand, J.; Senner, S.; Weiner, A.; Rabinowitch, S.; Brodersen, M.; Rice, K.; Klinge, K.; MacMullin, S.; Yender, R.; Thompson, R.

    1993-01-01

    The restoration planning process has yielded a number of possible alternatives for restoring resources and services injured by the Exxon Valdez oil spill. They were developed by resource managers, scientists, and the public, taking into consideration the results of damage assessment and restoration studies and information from the scientific literature. The alternatives thus far identified include no action natural recovery, management of human uses, manipulation of resources, habitat protection and acquisition, acquisition of equivalent resources, and combinations of the above. Each alternative consists of a different mix of resource- or service-specific restoration options. To decide whether it was appropriate to spend restoration funds on a particular resource or service, first criteria had to be developed that evaluated available evidence for consequential injury and the adequacy and rate of natural recovery. Then, recognizing the range of effective restoration options, a second set of criteria was applied to determine which restoration options were the most beneficial. These criteria included technical feasibility, potential to improve the rate or degree of recovery, the relationship of expected costs to benefits, cost effectiveness, and the potential to restore the ecosystem as a whole. The restoration options considered to be most beneficial will be grouped together in several or more of the above alternatives and presented in a draft restoration plan. They will be further evaluated in a companion draft environmental impact statement

  15. Energy options

    International Nuclear Information System (INIS)

    Hampton, Michael

    1999-01-01

    This chapter focuses on energy options as a means of managing exposure to energy prices. An intuitive approach to energy options is presented, and traditional definitions of call and put options are given. The relationship between options and swaps, option value and option exercises, commodity options, and option pricing are described. An end-user's guide to energy option strategy is outlined, and straight options, collars, participating swaps and collars, bull and bear spreads, and swaption are examined. Panels explaining the defining of basis risk, and discussing option pricing and the Greeks, delta hedging, managing oil options using the Black-Scholes model, caps, floors and collars, and guidelines on hedging versus speculation with options are included in the paper

  16. Technical specifications, Shoreham Nuclear Power Station, Unit No. 1 (Docket No. 50-322): Appendix ''A'' to License No. NPF-82

    International Nuclear Information System (INIS)

    1989-04-01

    The Shoreham, Unit 1, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public. 20 figs., 75 tabs

  17. Evaluating Space Weather Architecture Options to Support Human Deep Space Exploration of the Moon and Mars

    Science.gov (United States)

    Parker, L.; Minow, J.; Pulkkinen, A.; Fry, D.; Semones, E.; Allen, J.; St Cyr, C.; Mertens, C.; Jun, I.; Onsager, T.; Hock, R.

    2018-02-01

    NASA's Engineering and Space Center (NESC) is conducting an independent technical assessment of space environment monitoring and forecasting architecture options to support human and robotic deep space exploration.

  18. Technical Specifications, South Texas Project, Unit No. 1 (Docket No. 50-498): Appendix ''A'' to License No. NPF-76

    International Nuclear Information System (INIS)

    1988-03-01

    The South Texas Project, Unit No. 1, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public. This report is Appendix A to License No. NPF-76

  19. Disposal/recovery options for brine waters from oil and gas production in New York State. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, M.R.; Atkinson, J.F.; Bunn, M.D.; Hodge, D.S.

    1996-03-01

    Produced water from oil and gas operations, or brine as it is typically referred, may be characterized as being highly saline, with total dissolved solids greater than 100 g/L. If these bribes are disposed improperly there may be severe adverse environmental effects. Thus, it is important that brine be disposed using environmentally sound methods. Unfortunately, costs for the disposal of brine water are a significant burden to oil and gas producers in New York State. These costs and the relatively low market price of oil and natural gas have contributed to the decline in gas and oil production in New York State during the past 10 years. The objectives of this study were to evaluate new and existing options for brine disposal in New York State, examine the technical and economic merits of these options, and assess environmental impacts associated with each option. Two new disposal options investigated for New York State oil and gas producers included construction of a regional brine treatment facility to treat brine prior to discharge into a receiving water and a salt production facility that utilizes produced water as a feed stock. Both options are technically feasible; however, their economic viability depends on facility size and volume of brine treated.

  20. Disposal/recovery options for brine waters from oil and gas production in New York State. Final report

    International Nuclear Information System (INIS)

    Matsumoto, M.R.; Atkinson, J.F.; Bunn, M.D.; Hodge, D.S.

    1996-03-01

    Produced water from oil and gas operations, or brine as it is typically referred, may be characterized as being highly saline, with total dissolved solids greater than 100 g/L. If these bribes are disposed improperly there may be severe adverse environmental effects. Thus, it is important that brine be disposed using environmentally sound methods. Unfortunately, costs for the disposal of brine water are a significant burden to oil and gas producers in New York State. These costs and the relatively low market price of oil and natural gas have contributed to the decline in gas and oil production in New York State during the past 10 years. The objectives of this study were to evaluate new and existing options for brine disposal in New York State, examine the technical and economic merits of these options, and assess environmental impacts associated with each option. Two new disposal options investigated for New York State oil and gas producers included construction of a regional brine treatment facility to treat brine prior to discharge into a receiving water and a salt production facility that utilizes produced water as a feed stock. Both options are technically feasible; however, their economic viability depends on facility size and volume of brine treated

  1. Savannah River Plant Low-Level Waste Heat Utilization Project preliminary analysis. Volume III. Preferred utilization options

    International Nuclear Information System (INIS)

    1978-11-01

    The technical, economic, environmental, and institutional considerations that must be resolved before implementing options to recover energy from the heated SRP effluent are examined. Detailed hypothetical siting options and expected economic returns are examined for power generation, prawn production, and one industrial park scenario. The likely indirect effects on regional population, income, taxes, and infrastructure requirements if the industrial park scenario is implemented are also projected. Recommendations for follow-on studies to make possible an informed go/no-go decision for implementing attractive waste heat options using reject SRP effluent are included

  2. Preliminary Analysis of Helicopter Options to Support Tunisian Counterterrorism Operations

    Science.gov (United States)

    2016-04-27

    helicopters from Sikorsky to fulfill a number of roles in counterterrorism operations. Rising costs and delays in delivery raised the question of...whether other cost-effective options exist to meet Tunisia’s helicopter requirement. Approach Our team conducted a preliminary assessment of...alternative helicopters for counterterrorism air assault missions. Any decision to acquire an aircraft must consider many factors, including technical

  3. Nuclear Fuel Cycle Options Catalog: FY16 Improvements and Additions

    Energy Technology Data Exchange (ETDEWEB)

    Price, Laura L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barela, Amanda Crystal [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schetnan, Richard Reed [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Walkow, Walter M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-08-31

    The United States Department of Energy, Office of Nuclear Energy, Fuel Cycle Technology Program sponsors nuclear fuel cycle research and development. As part of its Fuel Cycle Options campaign, the DOE has established the Nuclear Fuel Cycle Options Catalog. The catalog is intended for use by the Fuel Cycle Technologies Program in planning its research and development activities and disseminating information regarding nuclear energy to interested parties. The purpose of this report is to document the improvements and additions that have been made to the Nuclear Fuel Cycle Options Catalog in the 2016 fiscal year.

  4. Nuclear Fuel Cycle Options Catalog FY15 Improvements and Additions.

    Energy Technology Data Exchange (ETDEWEB)

    Price, Laura L. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Barela, Amanda Crystal [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Schetnan, Richard Reed [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Walkow, Walter M. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    The United States Department of Energy, Office of Nuclear Energy, Fuel Cycle Technology Program sponsors nuclear fuel cycle research and development. As part of its Fuel Cycle Options campaign, the DOE has established the Nuclear Fuel Cycle Options Catalog. The catalog is intended for use by the Fuel Cycle Technologies Program in planning its research and development activities and disseminating information regarding nuclear energy to interested parties. The purpose of this report is to document the improvements and additions that have been made to the Nuclear Fuel Cycle Options Catalog in the 2015 fiscal year.

  5. Risk-informed approach in US-APWR technical specifications

    International Nuclear Information System (INIS)

    Saji, Etsuro; Tanaka, Futoshi; Kuroiwa, Katsuya; Kawai, Katsunori

    2009-01-01

    The Risk-Managed Technical Specifications and the Surveillance Frequency Control Program have been adopted in the US-APWR Technical Specifications. These risk-informed approaches are unique among the technical specifications for the advanced light water reactor designs adopted by planned nuclear power stations in the United States. (author)

  6. Future European Expendable Launcher Options and Technology Preparation

    OpenAIRE

    Sippel, Martin; van Foreest, Arnold; Klevanski, Josef; Gerstmann, Jens; Dutheil, Jean-Philippe; Jäger, Markus; Philip, Peter

    2008-01-01

    The paper describes latest results of the most recent activities in Germany in the technical assessment of future European launcher architecture. In a joint effort of DLR-SART with German launcher industry a next generation upper-medium class expendable TSTO and options for new liquid fuel upper stages for the small VEGA-launcher are addressed. The WOTAN study has investigated fully cryogenic launchers as well as those with a combination of solid and cryogenic stages, fulfilling a requirement...

  7. The logic of Technical Standardisation

    DEFF Research Database (Denmark)

    Nedergaard, Peter

    In this paper technical standardisation is understood and explained in a model where economic analysis is coupled with an analysis of the political system as proposed in rational choice theory. The aim is to answer both the question why various countries (e.g. the United States versus European...... countries) let either the market or public intervention determine the mode of technical standardisation and the possible implications of these two ways of organizing technical standardisation from an economic and a political point of view. Based upon the analysis of the paper a couple of general policy...... recommendations are made concerning the mode of technical standardisation....

  8. CANDU fuel cycle options in Korea

    International Nuclear Information System (INIS)

    Boczar, P.G.; Fehrenbach, P.J.; Meneley, D.A.

    1996-04-01

    The easiest first step in CANDU fuel-cycle evolution may be the use of slightly enriched uranium (SEU), including recovered uranium from reprocessed LWR spent fuel. Relatively low enrichment (up to 1.2%) will result in a twoto three-fold reduction in the quantity of spent fuel per unit energy production, reductions in fuel-cycle costs, and greater flexibility in the design of new reactors. The CANFLEX (CANDU FLEXible) fuel bundle would be the optimal fuel carrier. A country that has both CANDU and PWR reactors can exploit the natural synergism between these two reactor types to minimize overall waste production, and maximize energy derived from the fuel. This synergism can be exploited through several different fuel cycles. A high burnup CANDU MOX fuel design could be used to utilize plutonium from conventional reprocessing or more advanced reprocessing options (such as co-processing). DUPIC (Direct Use of Spent PWR Fuel In CANDU) represents a recycle option that has a higher degree of proliferation resistance than does conventional reprocessing, since it uses only dry processes for converting spent PWR fuel into CANDU fuel, without separating the plutonium. Good progress is being made in the current KAERI, AECL, and U.S. Department of State program in demonstrating the technical feasibility of DUPIC. In the longer term, CANDU reactors offer even more dramatic synergistic fuel cycles with PWR or FBR reactors. If the objective of a national fuel-cycle program is the minimization of actinide waste or destruction of long-lived fission products, then studies have shown the superiority of CANDU reactors in meeting this objective. Long-term energy security can be assured either through the thorium cycle or through a CANDU 1 FBR system, in which the FBR would be operated as a 'fuel factory,' providing the fissile material to power a number of lower-cost, high efficiency CANDU reactors. In summary, the CANDU reactor's simple fuel design, high neutron economy, and on

  9. Denali, Tulip, and Option Inferior Vena Cava Filter Retrieval: A Single Center Experience.

    Science.gov (United States)

    Ramaswamy, Raja S; Jun, Emily; van Beek, Darren; Mani, Naganathan; Salter, Amber; Kim, Seung K; Akinwande, Olaguoke

    2018-04-01

    To compare the technical success of filter retrieval in Denali, Tulip, and Option inferior vena cava filters. A retrospective analysis of Denali, Gunther Tulip, and Option IVC filters was conducted. Retrieval failure rates, fluoroscopy time, sedation time, use of advanced retrieval techniques, and filter-related complications that led to retrieval failure were recorded. There were 107 Denali, 43 Option, and 39 Tulip filters deployed and removed with average dwell times of 93.5, 86.0, and 131 days, respectively. Retrieval failure rates were 0.9% for Denali, 11.6% for Option, and 5.1% for Tulip filters (Denali vs. Option p = 0.018; Denali vs. Tulip p = 0.159; Tulip vs. Option p = 0.045). Median fluoroscopy time for filter retrieval was 3.2 min for the Denali filter, 6.75 min for the Option filter, and 4.95 min for the Tulip filter (Denali vs. OptionOption p = 0.67). Advanced retrieval techniques were used in 0.9% of Denali filters, 21.1% in Option filters, and 10.8% in Tulip filters (Denali vs. OptionOptionOption filter when compared to both the Denali and Tulip filters. Retrieval of the Denali filter required significantly less amount of fluoroscopy time and use of advanced retrieval techniques when compared to both the Option and Tulip filters. The findings of this study indicate easier retrieval of the Denali and Tulip IVC filters when compared to the Option filter.

  10. Engineering Technical Support Center Annual Report Fiscal Year 2015

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provid...

  11. 48 CFR 552.217-71 - Notice Regarding Option(s).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Notice Regarding Option(s... Notice Regarding Option(s). As prescribed in 517.208(b), insert the following provision: Notice Regarding Option(s) (NOV 1992) The General Services Administration (GSA) has included an option to [Insert...

  12. Freight Advanced Traveler Information System (FRATIS) Dallas-Fort Worth : software architecture design and implementation options.

    Science.gov (United States)

    2013-05-01

    This document describes the Software Architecture Design and Implementation Options for FRATIS : system. The demonstration component of this task will serve to test the technical feasibility of the : FRATIS prototype while also facilitating the colle...

  13. Nonsurgical Treatment Options for Basal Cell Carcinoma

    International Nuclear Information System (INIS)

    Lien, M. H.; Sondak, V. K.; Sondak, V. K.

    2011-01-01

    Basal cell carcinoma (BCC) remains the most common form of non melanoma skin cancer (NMSC) in Caucasians, with perhaps as many as 2 million new cases expected to occur in the United States in 2010. Many treatment options, including surgical interventions and nonsurgical alternatives, have been utilized to treat BCC. In this paper, two non-surgical options, imiquimod therapy and photodynamic therapy (PDT), will be discussed. Both modalities have demonstrated acceptable disease control rates, cosmetically superior outcomes, and short-term cost-effectiveness. Further studies evaluating long-term cure rates and long-term cost effectiveness of imiquimod therapy and PDT are needed.

  14. Economics of Alaska North Slope gas utilization options

    International Nuclear Information System (INIS)

    Thomas, C.P.; Doughty, T.C.; Hackworth, J.H.; North, W.B.; Robertson, E.P.

    1996-08-01

    The recoverable natural gas available for sale in the developed and known undeveloped fields on the Alaskan North Slope (ANS) total about 26 trillion cubic feet (TCF), including 22 TCF in the Prudhoe Bay Unit (PBU) and 3 TCF in the undeveloped Point Thomson Unit (PTU). No significant commercial use has been made of this large natural gas resource because there are no facilities in place to transport this gas to current markets. To date the economics have not been favorable to support development of a gas transportation system. However, with the declining trend in ANS oil production, interest in development of this huge gas resource is rising, making it important for the U.S. Department of Energy, industry, and the State of Alaska to evaluate and assess the options for development of this vast gas resource. The purpose of this study was to assess whether gas-to-liquids (GTL) conversion technology would be an economic alternative for the development and sale of the large, remote, and currently unmarketable ANS natural gas resource, and to compare the long term economic impact of a GTL conversion option to that of the more frequently discussed natural gas pipeline/liquefied natural gas (LNG) option. The major components of the study are: an assessment of the ANS oil and gas resources; an analysis of conversion and transportation options; a review of natural gas, LNG, and selected oil product markets; and an economic analysis of the LNG and GTL gas sales options based on publicly available input needed for assumptions of the economic variables. Uncertainties in assumptions are evaluated by determining the sensitivity of project economics to changes in baseline economic variables

  15. Review of Technical Studies in the United States in Support of Burnup Credit Regulatory Guidance

    International Nuclear Information System (INIS)

    Wagner, John C.; Parks, Cecil V.; Mueller, Don; Gauld, Ian C.

    2010-01-01

    Taking credit for the reduction in reactivity associated with fuel depletion can enable more cost-effective, higher-density storage, transport, disposal, and reprocessing of spent nuclear fuel (SNF) while maintaining sufficient subcritical margin to establish an adequate safety basis. Consequently, there continues to be considerable interest in the United States (U.S.), as well as internationally, in the increased use of burnup credit in SNF operations, particularly related to storage, transport, and disposal of commercial SNF. This interest has motivated numerous technical studies related to the application of burnup credit, both domestically and internationally, as well as the design of SNF storage, transport and disposal systems that rely on burnup credit for maintaining subcriticality. Responding to industry requests and needs, the U.S. Nuclear Regulatory Commission (NRC) initiated a burnup credit research program in 1999, with support from the Oak Ridge National Laboratory (ORNL), to develop regulatory guidance and the supporting technical bases for allowing and expanding the use of burnup credit in pressurized-water reactor SNF storage and transport applications. Although this NRC research program has not been continuous since its inception, considerable progress has been achieved in many key areas in terms of increased understanding of relevant phenomena and issues, availability of relevant information and data, and subsequently updated regulatory guidance for expanded use of burnup credit. This paper reviews technical studies performed by ORNL for the U.S. NRC burnup credit research program. Examples of topics include reactivity effects associated with reactor operating characteristics, fuel assembly characteristics, burnable absorbers, control rods, spatial burnup distributions, cooling time, and assembly misloading; methods and data for validation of isotopic composition predictions; methods and data for validation of criticality calculations; and

  16. Impact of Healthy Vending Machine Options in a Large Community Health Organization.

    Science.gov (United States)

    Grivois-Shah, Ravi; Gonzalez, Juan R; Khandekar, Shashank P; Howerter, Amy L; O'Connor, Patrick A; Edwards, Barbara A

    2017-01-01

    To determine whether increasing the proportion of healthier options in vending machines decreases the amount of calories, fat, sugar, and sodium vended, while maintaining total sales revenue. This study evaluated the impact of altering nutritious options to vending machines throughout the Banner Health organization by comparing vended items' sales and nutrition information over 6 months compared to the same 6 months of the previous year. Twenty-three locations including corporate and patient-care centers. Changing vending machine composition toward more nutritious options. Comparisons of monthly aggregates of sales, units vended, calories, fat, sodium, and sugar vended by site. A pre-post analysis using paired t tests comparing 6 months before implementation to the equivalent 6 months postimplementation. Significant average monthly decreases were seen for calories (16.7%, P = .002), fat (27.4%, P ≤ .0001), sodium (25.9%, P ≤ .0001), and sugar (11.8%, P = .045) vended from 2014 to 2015. Changes in revenue and units vended did not change from 2014 to 2015 ( P = .58 and P = .45, respectively). Increasing the proportion of healthier options in vending machines from 20% to 80% significantly lowered the amount of calories, sodium, fat, and sugar vended, while not reducing units vended or having a negative financial impact.

  17. Nuclear Power Options Viability Study. Volume 4. Bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Trauger, D B; White, J D; Sims, J W [eds.

    1986-09-01

    Documents in the Nuclear Power Options Viability Study (NPOVS) bibliography are classified under one of four headings or categories as follows: nuclear options; light water reactors; liquid metal reactors; and high temperature reactors. The collection and selection of these documents, beginning early in 1984 and continuing through March of 1986, was carried out in support of the study's objective: to explore the viabilities of several nuclear electric power generation options for commercial deployment in the United States between 2000 and 2010. There are approximately 550 articles, papers, reports, and books in the bibliography that have been selected from some 2000 surveyed. The citations have been made computer accessible to facilitate rapid on-line retrieval by keyword, author, corporate author, title, journal name, or document number.

  18. Nuclear Power Options Viability Study. Volume 4. Bibliography

    International Nuclear Information System (INIS)

    Trauger, D.B.; White, J.D.; Sims, J.W.

    1986-09-01

    Documents in the Nuclear Power Options Viability Study (NPOVS) bibliography are classified under one of four headings or categories as follows: nuclear options; light water reactors; liquid metal reactors; and high temperature reactors. The collection and selection of these documents, beginning early in 1984 and continuing through March of 1986, was carried out in support of the study's objective: to explore the viabilities of several nuclear electric power generation options for commercial deployment in the United States between 2000 and 2010. There are approximately 550 articles, papers, reports, and books in the bibliography that have been selected from some 2000 surveyed. The citations have been made computer accessible to facilitate rapid on-line retrieval by keyword, author, corporate author, title, journal name, or document number

  19. Combined Heat and Power (CHP) as a Compliance Option under the Clean Power Plan: A Template and Policy Options for State Regulators

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-07-30

    Combined Heat and Power (CHP) is an important option for states to consider in developing strategies to meet their emission targets under the US Environmental Protection Agency's Clean Power Plan. This Template is designed to highlight key issues that states should consider when evaluating whether CHP could be a meaningful component of their compliance plans. It demonstrates that CHP can be a valuable approach for reducing emissions and helping states achieve their targets. While the report does not endorse any particular approach for any state, and actual plans will vary dependent upon state-specific factors and determinations, it provides tools and resources that states can use to begin the process, and underscores the opportunity CHP represents for many states. . By producing both heat and electricity from a single fuel source, CHP offers significant energy savings and carbon emissions benefits over the separate generation of heat and power, with a typical unit producing electricity with half the emissions of conventional generation. These efficiency gains translate to economic savings and enhanced competitiveness for CHP hosts, and emissions reductions for the state, along with helping to lower electric bills; and creating jobs in the design, construction, installation and maintenance of equipment. In 2015, CHP represents 8 percent of electric capacity in the United States and provides 12 percent of total power generation. Projects already exist in all 50 states, but significant technical and economic potential remains. CHP offers a tested way for states to achieve their emission limits while advancing a host of ancillary benefits.

  20. The feasibility study I on the blanket fuel options for the ATW/HYPER

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Woan; Lee, Byoung Oon; Lee, Bong Sang; Park, Won Seok; Meyer, M.K; Hayes, S.L

    2001-01-01

    The choice of a blanket fuel cycle technology and the fuel type for HYPER/ATW are important to develop an ADS with better economics, performance and safety. Even though several fuel types have been considered as an alternative of the blanket fuels for HYPER/ATW, the metal alloy and the dispersion fuels were selected as the candidate fuels for ADS, and the technical feasibilities for both fuels are evaluated in this report. General performance characteristics, fabrication abilities, technical aspects, safety aspects, economics, and non-proliferation aspects for each fuel type are reviewed and evaluated. And some technological problems are addressed in this report, focused on the development strategy, the roadmaps, and the flexibility to meet the missions and specific designs. This study has been performed at the first stage of conceptual design. Since it is under the lack of physical properties for each fuel material, no an attempt is made to select the best fuel option, but the more better fuel options are recommended.

  1. The feasibility study I on the blanket fuel options for the ATW/HYPER

    International Nuclear Information System (INIS)

    Hwang, Woan; Lee, Byoung Oon; Lee, Bong Sang; Park, Won Seok; Meyer, M.K; Hayes, S.L.

    2001-01-01

    The choice of a blanket fuel cycle technology and the fuel type for HYPER/ATW are important to develop an ADS with better economics, performance and safety. Even though several fuel types have been considered as an alternative of the blanket fuels for HYPER/ATW, the metal alloy and the dispersion fuels were selected as the candidate fuels for ADS, and the technical feasibilities for both fuels are evaluated in this report. General performance characteristics, fabrication abilities, technical aspects, safety aspects, economics, and non-proliferation aspects for each fuel type are reviewed and evaluated. And some technological problems are addressed in this report, focused on the development strategy, the roadmaps, and the flexibility to meet the missions and specific designs. This study has been performed at the first stage of conceptual design. Since it is under the lack of physical properties for each fuel material, no an attempt is made to select the best fuel option, but the more better fuel options are recommended

  2. The Electrical Engineering Curriculum at the Technical University of Denmark - Options in Microelectronics

    DEFF Research Database (Denmark)

    Bruun, Erik; Nielsen, Lars Drud

    1997-01-01

    This paper describes the modular structure of the engineering curriculum at the Technical University of Denmark. The basic requirements for an electrical engineering curriculum are presented and different possibilities for specialization in microelectronics and integrated circuit design...

  3. Instrumentation and electrical program at the Three Mile Island Unit 2, Technical Integration Office

    International Nuclear Information System (INIS)

    Hecker, L.A.

    1982-01-01

    The Three Mile Island Unit 2 accident of March 28, 1979 presents unique research opportunities that can provide valuable information on nuclear power plant safety philosophy and safety systems performance. The Technical Integration Office at Three Mile Island was established by the Department of Energy to manage a broad-based research and development program. One significant part of this effort is the Instrumentation and Electrical Program, which operates: (1) to identify instruments and electrical components that failed during or since the accident; (2) to test and analyze them in order to identify the causes of failure; and (3) to assess the survivability of those that did not fail. The basis for selection of equipment is discussed, and the testing methodology is described. Also, some results of Instrumentation and Electrical Program work to date are presented

  4. US decommissioning strategy in today's regulatory, technical, political, and economic environments

    International Nuclear Information System (INIS)

    Colvin, J.F.

    1995-01-01

    The United States commercial nuclear power industry is nearly forty years old. Soon after the turn of the century, the United States expects to see a significant rise in the number of plants requiring decommissioning. This, coupled with recent economic pressures which are impacting the U.S. electrical generation industry and have resulted in the premature shutdown of some nuclear power plants, heighten the need for clear regulations and standards addressing facility closure and decommissioning. Since the issue of decommissioning involves public health and safety, technical, environmental and financial aspects, this complex regulatory environment poses a major challenge to the industry in this area. There are three fundamental issues facing utilities as they develop strategies for the eventual decommissioning of their nuclear power plants. These issues are the regulatory approach to decommissioning, the question of the availability of adequate funding, including the uncertainty resulting from the uncertainty of waste disposal options, and the need to meet environmental standards for the protection of health and safety. Futhermore, these issues, in particular the economic-related issues, are magnified in the event of prematurely shut down nuclear power plant. (Author)

  5. Radiological impacts of spent nuclear fuel management options

    International Nuclear Information System (INIS)

    Riotte, H.; Lazo, T.; Mundigl, S.

    2000-01-01

    An important technical study on radiological impacts of spent nuclear fuel management options, recently completed by the NEA, is intended to facilitate informed international discussions on the nuclear fuel cycle. The study compares the radiological impacts on the public and on nuclear workers resulting from two approaches to handling spent fuel from nuclear power plants: - the reprocessing option, that includes the recycling of spent uranium fuel, the reuse of the separated plutonium in MOX fuel, and the direct disposal of spent MOX fuel; and the once-through option, with no reprocessing of spent fuel, and its direct disposal. Based on the detailed research of a group of 18 internationally recognised experts, under NEA sponsorship, the report concludes that: The radiological impacts of both the reprocessing and the non-reprocessing fuel cycles studied are small, well below any regulatory dose limits for the public and for workers, and insignificantly low as compared with exposures caused by natural radiation. The difference in the radiological impacts of the two fuel cycles studied does not provide a compelling argument in favour of one option or the other. The study also points out that other factors, such as resource utilisation efficiency, energy security, and social and economic considerations would tend to carry more weight than radiological impacts in decision-making processes. (authors)

  6. Follicular unit extraction as a therapeutic option for Vitiligo

    Directory of Open Access Journals (Sweden)

    S Sacchidanand

    2013-01-01

    Full Text Available Follicular unit extraction (FUE is a surgical procedure, which can be used to transplant follicular units into vitiliginous areas. Such follicular unit transplant has been recently used to repigment stable vitiligo patches. FUE was done for a 12-year-old female with a stable vitiligo patch with leukotrichia on the eyebrow. Repigmentation was noted in 6 weeks and complete pigmentation seen at 12 weeks. Leukotrichia resolved over a period of 6 months. No recurrence was noted at the end of 6 months follow-up with excellent colour match. This case is presented to highlight the simplicity, safety and effectiveness of FUE in stable vitiligo patches with leukotrichia.

  7. Comparison of Standards and Technical Requirements of Grid-Connected Wind Power Plants in China and the United States

    Energy Technology Data Exchange (ETDEWEB)

    Gao, David Wenzhong [Alternative Power Innovations, LLC; Muljadi, Eduard [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miller, Mackay [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wang, Weisheng [China Electric Power Research Inst. (China)

    2016-09-01

    The rapid deployment of wind power has made grid integration and operational issues focal points in industry discussions and research. Compliance with grid connection standards for wind power plants (WPPs) is crucial to ensuring the reliable and stable operation of the electric power grid. This report compares the standards for grid-connected WPPs in China to those in the United States to facilitate further improvements in wind power standards and enhance the development of wind power equipment. Detailed analyses of power quality, low-voltage ride-through capability, active power control, reactive power control, voltage control, and wind power forecasting are provided to enhance the understanding of grid codes in the two largest markets of wind power. This study compares WPP interconnection standards and technical requirements in China to those in the United States.

  8. Korean Crisis, 1994: Military Geography, Military Balance, Military Options. CRS Report for Congress

    National Research Council Canada - National Science Library

    Collins, John

    1994-01-01

    .... This report reviews military options open to each side as the United Nations, United States, and South Korea explore ways to resolve the resultant crisis peacefully despite threats of war from Pyongyang...

  9. Technical aspects of 3MV particle accelerator at GGV Bilaspur

    International Nuclear Information System (INIS)

    Mallik, C.

    2013-01-01

    The accelerator at GGV, Bilaspur is a 3 MV pelletron operating is Tandem mode. The talk will describe the technical aspects of the accelerator. It will also discuss the beam aspects of the pelletron and the feasibility options with the accelerator. (author)

  10. Systems for deep brain stimulation: review of technical features.

    Science.gov (United States)

    Amon, A; Alesch, F

    2017-09-01

    The use of deep brain stimulation (DBS) is an important treatment option for movement disorders and other medical conditions. Today, three major manufacturers provide implantable systems for DBS. Although the underlying principle is basically the same for all available systems, the differences in the technical features vary considerably. This article outlines aspects regarding the technical features of DBS systems. The differences between voltage and current sources are addressed and their effect on stimulation is shown. To maintain clinical benefit and minimize side effects the stimulation field has to be adapted to the requirements of the patient. Shaping of the stimulation field can be achieved by the electrode design and polarity configuration. Furthermore, the electric signal consisting of stimulation rate, stimulation amplitude and pulse width affect the stimulation field. Interleaving stimulation is an additional concept, which permits improved treatment outcomes. Therefore, the electrode design, the polarity, the electric signal, and the concept of interleaving stimulation are presented. The investigated systems can be also categorized as rechargeable and non-rechargeable, which is briefly discussed. Options for interconnecting different system components from various manufacturers are presented. The present paper summarizes the technical features and their combination possibilities, which can have a major impact on the therapeutic effect.

  11. Energy exotic options

    International Nuclear Information System (INIS)

    Kaminski, V.; Gibner, S.; Pinnamaneni, K.

    1999-01-01

    This chapter with 88 references focuses on the use of exotic options to control exposure to energy prices. Exotic options are defined, and the conversion of a standard option into an exotic option and pricing models are examined. Pricing and hedging exotic options, path-dependent options, multi-commodity options, options on the minimum-or-maximum of two commodities, compound options, digital options, hybrid and complex structures, and natural gas daily options are described. Formulas for option pricing for vanilla, barrier, compound, options on minimum or maximum of two assets, and look back options are given in an appendix

  12. 78 FR 25505 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Science.gov (United States)

    2013-05-01

    ...''), Apple, Inc. (``AAPL''), SPDR Gold Trust (``GLD''), Google Inc. (``GOOG'') and Amazon.com Inc. (``AMZN... equity and exchange-traded fund (``ETF'') option contracts have a unit of trading of 100 shares... standard equity and ETF options, including exercise style. Accordingly, the mini-option filing contained a...

  13. Using electricity options to hedge against financial risks of power producers

    DEFF Research Database (Denmark)

    Pineda Morente, Salvador; Conejo, Antonio J.

    2013-01-01

    or unexpected unit failures faced by power producers. A multi-stage stochastic model is described in this tutorial paper to determine the optimal forward and option contracting decisions for a risk-averse power producer. The key features of electricity options to reduce both price and availability risks......As a consequence of competition in electricity markets, a wide variety of financial derivatives have emerged to allow market agents to hedge against risks. Electricity options and forward contracts constitute adequate instruments to manage the financial risks pertaining to price volatility...

  14. Understanding Carbon Sequestration Options in the United States: Capabilities of a Carbon Management Geographic Information System

    Energy Technology Data Exchange (ETDEWEB)

    Dahowski, Robert T.; Dooley, James J.; Brown, Daryl R.; Mizoguchi, Akiyoshi; Shiozaki, Mai

    2001-04-03

    While one can discuss various sequestration options at a national or global level, the actual carbon management approach is highly site specific. In response to the need for a better understanding of carbon management options, Battelle in collaboration with Mitsubishi Corporation, has developed a state-of-the-art Geographic Information System (GIS) focused on carbon capture and sequestration opportunities in the United States. The GIS system contains information (e.g., fuel type, location, vintage, ownership, rated capacity) on all fossil-fired generation capacity in the Untied States with a rated capacity of at least 100 MW. There are also data on other CO2 sources (i.e., natural domes, gas processing plants, etc.) and associated pipelines currently serving enhanced oil recovery (EOR) projects. Data on current and prospective CO2 EOR projects include location, operator, reservoir and oil characteristics, production, and CO2 source. The system also contains information on priority deep saline aquifers and coal bed methane basins with potential for sequestering CO2. The GIS application not only enables data storage, flexible map making, and visualization capabilities, but also facilitates the spatial analyses required to solve complex linking of CO2 sources with appropriate and cost-effective sinks. A variety of screening criteria (spatial, geophysical, and economic) can be employed to identify sources and sinks most likely amenable to deployment of carbon capture and sequestration systems. The system is easily updateable, allowing it to stay on the leading edge of capture and sequestration technology as well as the ever-changing business landscape. Our paper and presentation will describe the development of this GIS and demonstrate its uses for carbon management analysis.

  15. Cluster: Drafting. Course: Introduction to Technical Drafting.

    Science.gov (United States)

    Sanford - Lee County Schools, NC.

    The set of 10 units is designed for use with an instructor as an introduction to technical drafting, and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: drafting…

  16. Pilot-scale fluidized-bed combustor testing cofiring animal-tissue biomass with coal as a carcass disposal option

    Energy Technology Data Exchange (ETDEWEB)

    Bruce G. Miller; Sharon Falcone Miller; Elizabeth M. Fedorowicz; David W. Harlan; Linda A. Detwiler; Michelle L. Rossman [Pennsylvania State University, University Park, PA (United States). Energy Institute

    2006-10-15

    This study was performed to demonstrate the technical viability of cofiring animal-tissue biomass (ATB) in a coal-fired fluidized-bed combustor (FBC) as an option for disposing of specified risk materials (SRMs) and carcasses. The purpose of this study was to assess the technical issues of feeding/combusting ATB and not to investigate prion deactivation/pathogen destruction. Overall, the project successfully demonstrated that carcasses and SRMs can be cofired with coal in a bubbling FBC. Feeding ATB into the FBC did, however, present several challenges. Specifically, handling/feeding issues resulting from the small scale of the equipment and the extremely heterogeneous nature of the ATB were encountered during the testing. Feeder modifications and an overbed firing system were necessary. Through statistical analysis, it was shown that the ATB feed location had a greater effect on CO emissions, which were used as an indication of combustion performance, than the fuel type due to the feeding difficulties. Baseline coal tests and tests cofiring ATB into the bed were statistically indistinguishable. Fuel feeding issues would not be expected at the full scale since full-scale units routinely handle low-quality fuels. In a full-scale unit, the disproportionate ratio of feed line size to unit diameter would be eliminated thereby eliminating feed slugging. Also, the ATB would either be injected into the bed, thereby ensuring uniform mixing and complete combustion, or be injected directly above the bed with overfire air ports used to ensure complete combustion. Therefore, it is anticipated that a demonstration at the full scale, which is the next activity in demonstrating this concept, should be successful. As the statistical analysis shows, emissions cofiring ATB with coal would be expected to be similar to that when firing coal only. 14 refs., 5 figs., 6 tabs.

  17. Flexibilization of methanization units in Germany. Overview of technical approaches, of the regulatory framework, and of the importance for the energy system - Synthesis note

    International Nuclear Information System (INIS)

    Trommler, Marcus; Dotzauer, Martin; Barchmann, Tino; Lauer, Markus; Hennig, Christiane; Mauky, Eric; Liebetrau, Jan; Thraen, Daniela; Risler, Julian

    2016-03-01

    Technologies of valorisation of biomass offer opportunities to produce a flexible and renewable energy suitable to compensate the intermittency of wind and solar energies which depend on meteorological conditions. As methanization units operated in a flexible way are now mainly present in Germany, notably due to public financial supports to flexibility, this publication describes the status of flexibilization in German methanization units, and highlights relationships with the electricity system, technical approaches to flexibility (implemented technology, gas valorisation in biomethane and injection in the natural gas network, adjustment of gas production for supply management, methanization units and hybrid concepts), and incentive policy (flexibility premium, marketing strategy). The publication finally discusses perspectives for these flexible methanization units

  18. Consensus statement for use and technical requirements of thyroid ultrasound in endocrinology units.

    Science.gov (United States)

    Martín-Hernández, Tomás; Díez Gómez, Juan José; Díaz-Soto, Gonzalo; Torres Cuadro, Alberto; Navarro González, Elena; Oleaga Alday, Amelia; Sambo Salas, Marcel; Reverter Calatayud, Jordi L; Argüelles Jiménez, Iñaki; Mancha Doblas, Isabel; Fernández García, Diego; Galofré, Juan Carlos

    2017-03-01

    Thyroid nodule detection has increased with widespread use of ultrasound, which is currently the main tool for detection, monitoring, diagnosis and, in some instances, treatment of thyroid nodules. Knowledge of ultrasound and adequate instruction on its use require a position statement by the scientific societies concerned. The working groups on thyroid cancer and ultrasound techniques of the Spanish Society of Endocrinology and Nutrition have promoted this document, based on a thorough analysis of the current literature, the results of multicenter studies and expert consensus, in order to set the requirements for the best use of ultrasound in clinical practice. The objectives include the adequate framework for use of thyroid ultrasound, the technical and legal requirements, the clinical situations in which it is recommended, the levels of knowledge and learning processes, the associated responsibility, and the establishment of a standardized reporting of results and integration into hospital information systems and endocrinology units. Copyright © 2017 SEEN. Publicado por Elsevier España, S.L.U. All rights reserved.

  19. Typology of Options for Metal Recycling: Australia’s Perspective

    Directory of Open Access Journals (Sweden)

    Artem Golev

    2015-12-01

    Full Text Available While Australia has traditionally relied on obtaining metals from primary sources (namely mined natural resources, there is significant potential to recover metals from end-of-life-products and industrial waste. Although any metals recycling value chain requires a feasible technology at its core, many other non-technical factors are key links in the chain, which can compromise the overall viability to recycle a commodity and/or product. The “Wealth from Waste” Cluster project funded by the Commonwealth Scientific Industrial Research Organisation (CSIRO Flagship Collaboration Fund and partner universities is focusing on identifying viable options to “mine” metals contained in discarded urban infrastructure, manufactured products and consumer goods. A key aspect of this research is to understand the critical non-technical barriers and system opportunities to enhance rates of metals recycling in Australia. Work to date has estimated the mass and current worth of metals in above ground resources. Using these outcomes as a basis, a typology for different options for (metal reuse and recycling has been developed to classify the common features, which is presented in this article. In addition, the authors investigate the barriers and enablers in the recycling value chain, and propose a set of requirements for a feasible pathway to close the material loop for metals in Australia.

  20. A review of clinical and technical considerations for fixed and removable implant prostheses in the edentulous mandible.

    Science.gov (United States)

    Zitzmann, Nicola Ursula; Marinello, Carlo Paolo

    2002-01-01

    The aim of the present article is to review some of the technical treatment options for implant prostheses restoring the edentulous mandible, mainly based on the Brånemark system. Clinical and technical aspects are discussed for the three established concepts: (1) implant-supported fixed prosthesis, (2) removable implant-supported overdenture, and (3) combined implant-retained and soft tissue-supported overdenture prosthesis. The framework of an implant-supported fixed screw-retained prosthesis can be processed in gold, Co-Cr alloy, or titanium with casting, laser-welding, or milling techniques. To improve the stability and retention of a conventional complete denture, one to four implants are indicated, and unsplinted (single attachments) or splinted designs (bar systems) can be applied. The design of the overdenture prosthesis must be carefully planned according to the requirements to ensure adequate stability and optimal form, contour, and esthetics, and the patient's best comfort. A large variety of different treatment modalities exist for both the fixed and removable mandibular implant prosthesis. Clinical and technical aspects should be considered at the beginning of the treatment to: (1) select the optimal implant position, (2) establish an adequate number of functional units, (3) select the appropriate retainers, and (4) apply the best technique for framework processing and veneering.

  1. International cooperation on technical support for regulation of safety-related activities on the transformation of the destroyed Chernobyl Nuclear Power Plant Power Unit into an ecologically safe system

    International Nuclear Information System (INIS)

    Groniov, G.; Kondratiev, S.; Kutina, L.; Bachner, D.; Kuechler, L.; Denver, D.

    2010-01-01

    The world's most severe nuclear accident destroyed the fourth unit at the Chernobyl nuclear power plant in 1986. In the six months following the accident, a localizing building was erected over the unit to contain the nuclear materials and provide support services for managing the destroyed reactor. Since 1997, an international project which includes both urgent measures for stabilization and safety upgrading as well as long-term measures for transforming the facility into an ecologically safe system has been under way. This paper discusses an important aspect of this project which has been the cooperation amongst the technical support organizations of the Ukrainian regulatory authorities and the technical support from international organizations. (author)

  2. Three Mile Island accident technical support

    International Nuclear Information System (INIS)

    Long, R.L.; Crimmins, T.M.; Lowe, W.W.

    1981-01-01

    A large number of technical support personnel were required to respond to the Three Mile Island Unit 2 (TMI-2) accident of March 28, 1979. Under the leadership of General Public Utilities personnel, onsite (round-the-clock shift) technical support began the evening of March 29 and within a week the TMI Recovery Organization incorporated all of the essential technical capability to implement the Base Plan for Cooldown, manage the radioactive waste problem, and begin the steps toward long-range plant recovery. These steps toward recovery are described in some detail. 1 refs

  3. Risk perception of various technical options in the field of radioactive waste management

    International Nuclear Information System (INIS)

    Cameron, F.X.

    1996-01-01

    The author's group had a wide ranging discussion of risk and, at the very end of the discussion got to the question that was posed to them, which is that of risk perception of various technical options in the field of radioactive waste management. Some of the points that were made in this discussion is a reality that the group, as decision-makers, have to deal with, and it has to be treated as a reality. Secondly, the scientist looks at risk from the classic definition of ''probability times consequences'', but the public only looks at the consequences side of the equation, and too often the probability of something happening is treated as a probability of one that it will actually happen. A third problem that was identified in this area is that often the efforts to make the disposal of waste safer may contribute, in the public mind, to the fact that the risk is even more hazardous. And the last problem is that people do not trust what a decision maker is saying when he talks about the fact that there is little probability of something happening. The group then went on to a discussion of how he should try to treat risk perception. One point that was made is that voluntary acceptance of a risk is important. A second point that was made on how to deal with risk perception problems is that the group could try to put the risk of radioactive waste disposal in the perspective of other risks to society, from the chemical industry for instance. The group also talked about the possibility of putting the benefits in perspective for people. Another point was that the group should have different communications strategies for different audiences. But, the more the public is involved in the decision making process, the more comfortable they are going to be with the risk, and the more consistent the perception of risk may be with the scientific definition thereof. In terms of new technologies, new innovations on the generation and management of waste, although these may actually

  4. How federalism shapes public health financing, policy, and program options.

    Science.gov (United States)

    Ogden, Lydia L

    2012-01-01

    In the United States, fiscal and functional federalism strongly shape public health policy and programs. Federalism has implications for public health practice: it molds financing and disbursement options, including funding formulas, which affect allocations and program goals, and shapes how funding decisions are operationalized in a political context. This article explores how American federalism, both fiscal and functional, structures public health funding, policy, and program options, investigating the effects of intergovernmental transfers on public health finance and programs.

  5. Perspective on long-range nuclear energy options

    International Nuclear Information System (INIS)

    Harms, W.O.

    1977-01-01

    The study group whose effort is presented here concluded that the United States urgently needs to have a breeder option available for possible deployment before the year 2000 primarily because of uncertainties in the availability of fossil fuels and uranium supplies. It was recommended that the U/Pu LMFBR program proceed as planned, including prompt construction of the CRBRP and its associated fuel cycle facilities. Alternative cycle studies should be pursued, but without significantly delaying the current program. There are technological choices which, in suitable political contexts, may somewhat reduce proliferation risks; of these, only those that employ breeders preserve the breeder option (and the nuclear option in the long term. These alternatives must be coupled with political agreements to have any significant effect on proliferation potential internationally. These same political agreements should suffice to control the U/Pu breeder cycle; there is only a difference in degree between the U/Pu and the denatured Th/U-233 cycles

  6. Career Technical Education Pathways Initiative Annual Report

    Science.gov (United States)

    California Community Colleges, Chancellor's Office, 2014

    2014-01-01

    California's education system--the largest in the United States--is an essential resource for ensuring strong economic growth in the state. The Career Technical Education Pathways Initiative (the Initiative) became law in 2005 with Senate Bills 70 and 1133 and provided more than $380 million over eight years to improve career technical education…

  7. Utilizing waste heat. Energy recovery options for trade and industry

    Energy Technology Data Exchange (ETDEWEB)

    Krieg, W

    1988-08-01

    The article shows options for efficient and low-cost thermal energy recovery. Heat recovery involves a number of problems, e.g. the type of waste heat, the uses of the energy recovered, and the best way of utilizing it. There is no generally applicable way of solving these problems. Some practical examples are presented. Economically efficient solutions require detailed technical knowledge as well as a good portion of creativity and imagination. (BR).

  8. Disposal options for radioactive waste

    International Nuclear Information System (INIS)

    Olivier, J.P.

    1991-01-01

    On the basis of the radionuclide composition and the relative toxicity of radioactive wastes, a range of different options are available for their disposal. Practically all disposal options rely on confinement of radioactive materials and isolation from the biosphere. Dilution and dispersion into the environment are only used for slightly contaminated gaseous and liquid effluents produced during the routine operation of nuclear facilities, such as power plants. For the bulk of solid radioactive waste, whatever the contamination level and decay of radiotoxicity with time are, isolation from the biosphere is the objective of waste disposal policies. The paper describes disposal approaches and the various techniques used in this respect, such as shallow land burial with minimum engineered barriers, engineered facilities built at/near the surface, rock cavities at great depth and finally deep geologic repositories for long-lived waste. The concept of disposing long-lived waste into seabed sediment layers is also discussed, as well as more remote possibilities, such as disposal in outer space or transmutation. For each of these disposal methods, the measures to be adopted at institutional level to reinforce technical isolation concepts are described. To the extent possible, some comments are made with regard to the applicability of such disposal methods to other hazardous wastes. (au)

  9. 20 CFR 416.2035 - Optional supplementation: Additional State options.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Optional supplementation: Additional State options. 416.2035 Section 416.2035 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SUPPLEMENTAL... § 416.2035 Optional supplementation: Additional State options. (a) Residency requirement. A State or...

  10. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  11. 77 FR 58194 - Self-Regulatory Organizations; The Options Clearing Corporation; Notice of Filing of Proposed...

    Science.gov (United States)

    2012-09-19

    ....S. Generally Accepted Accounting Principles. Canadian clearing members that use Form 1 report the... Organizations; The Options Clearing Corporation; Notice of Filing of Proposed Rule Change Relating to Financial... technical ``housekeeping'' changes to OCC's By-Laws and Rules relating to financial reporting by Canadian...

  12. Analysis of Options Contract, Option Pricing in Agricultural Products

    Directory of Open Access Journals (Sweden)

    H. Tamidy

    2016-03-01

    Full Text Available Introduction: Risk is an essential component in the production and sale of agricultural products. Due to the nature of agricultural products, the people who act in this area including farmers and businesspersons encounter unpredictable fluctuations of prices. On the other hand, the firms that process agricultural products also face fluctuation of price of agricultural inputs. Given that the Canola is considered as one of the inputs of product processing factories, control of unpredictable fluctuations of the price of this product would increase the possibility of correct decision making for farmers and managers of food processing industries. The best available tool for control and management of the price risk is the use of future markets and options. It is evident that the pricing is the main pillar in every trade. Therefore, offering a fair price for the options will be very important. In fact, options trading in the options market create cost insurance stopped. In this way, which can reduce the risks of deflation created in the future, if the person entitled to the benefits of the price increase occurs in the future. Unlike the futures, market where the seller had to deliver the product on time, in the options market, there is no such compulsion. In addition, this is one of the strengths of this option contract, because if there is not enough product for delivery to the futures market as result of chilling, in due course, the farmers suffer, but in the options market there will be a loss. In this study, the setup options of rape, as a product, as well as inputs has been paid for industry. Materials and Methods: In this section. The selection criteria of the disposal of asset base for valuation of European put options and call option is been introduced. That for obtain this purpose, some characteristics of the goods must considered: 1-Unpredictable fluctuations price of underlying asset 2 -large underlying asset cash market 3- The possibility

  13. Extracorporeal photopheresis: Review of technical aspects.

    Science.gov (United States)

    Arora, Satyam; Setia, Rasika

    2017-01-01

    Extracorporeal photochemotherapy (ECP) is considered as an immune modulating therapy majorly targeting the T cells of the Immune system. ECP induces an anti-inflammatory condition with tolerogenic responses without inducing a global immunosuppression state which is a typical feature of other therapeutic options such as steroids. Clinical indication of ECP has grown over time since its initial applications. Our review discusses the technical aspects of the concept of photopheresis with the available methods for its clinical applications.

  14. Forest managment options for sequestering carbon in Mexico

    International Nuclear Information System (INIS)

    Masera, O.R.; Bellon, M.R.; Segura, G.

    1995-01-01

    This paper identifies and examines economic response options to avoid carbon emissions and increase carbon sequestration in Mexican forests. A ''Policy'' scenario covering the years 2000, 2010 and 2030 and a ''Technical Potential'' scenario (year 2030) are developed to examine the potential carbon sequestration and costs of each response option. Benefit-cost analyses for three case studies, including management of a pulpwood plantation, a native temperate forest and a native tropical evergreen forest are presented and discussed. The study suggests that a large potential for reducing carbon emissions and increasing carbon sequestration exists in Mexican forests. However, the achievement of this potential will require important reforms to the current institutional setting of the forest sector. The management of native temperate and tropical forests offers the most promising alternatives for carbon sequestration. The cost effectiveness of commercial plantations critically depends on very high site productivity. Restoration of degraded forest lands; particularly through the establishment of energy plantations, also shows a large carbon sequestration potential. (Author)

  15. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    Energy Technology Data Exchange (ETDEWEB)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

  16. Technical and economic optimization study for HLW waste management

    International Nuclear Information System (INIS)

    Deffes, A.

    1989-01-01

    This study was conducted to assess the technical and economic aspects of high level waste (HLW) management with the objective of optimizing the interim storage duration and the dimensions of the underground repository site. The procedure consisted in optimizing the economic criterion under specified constraints. The results are intended to identify trends and guide the choice from among available options; simple and highly flexible models were therefore used in this study, and only nearfield thermal constraints were taken into consideration. Because of the present uncertainty on the physicochemical properties of the repository environment and on the unit cost figures, this study focused on developing a suitable method rather than on obtaining definitive results. With the physical and economic data bases used for the two media investigated (granite and salt) the optimum values found show that it is advisable to minimize the interim storage time, and that the geological repository should feature a high degree of spatial dilution. These results depend to a considerable extent on the assumption of high interim storage costs

  17. Comparison between three option, four option and five option multiple choice question tests for quality parameters: A randomized study.

    Science.gov (United States)

    Vegada, Bhavisha; Shukla, Apexa; Khilnani, Ajeetkumar; Charan, Jaykaran; Desai, Chetna

    2016-01-01

    Most of the academic teachers use four or five options per item of multiple choice question (MCQ) test as formative and summative assessment. Optimal number of options in MCQ item is a matter of considerable debate among academic teachers of various educational fields. There is a scarcity of the published literature regarding the optimum number of option in each item of MCQ in the field of medical education. To compare three options, four options, and five options MCQs test for the quality parameters - reliability, validity, item analysis, distracter analysis, and time analysis. Participants were 3 rd semester M.B.B.S. students. Students were divided randomly into three groups. Each group was given one set of MCQ test out of three options, four options, and five option randomly. Following the marking of the multiple choice tests, the participants' option selections were analyzed and comparisons were conducted of the mean marks, mean time, validity, reliability and facility value, discrimination index, point biserial value, distracter analysis of three different option formats. Students score more ( P = 0.000) and took less time ( P = 0.009) for the completion of three options as compared to four options and five options groups. Facility value was more ( P = 0.004) in three options group as compared to four and five options groups. There was no significant difference between three groups for the validity, reliability, and item discrimination. Nonfunctioning distracters were more in the four and five options group as compared to three option group. Assessment based on three option MCQs is can be preferred over four option and five option MCQs.

  18. Centralized vs decentralized options for a european data relay satellite system

    Science.gov (United States)

    Aubert, Ph. Saint; Hervieux, M.; Perbos, J. L.; Saggese, E.; Soprano, C.

    The European Data Relay Satellite (DRS) is now being planned to support future European missions in the nineties and in particular the various elements of the in-orbit infrastructure. Studies are being conducted to investigate the usefulness of the Relay System as well as to provide the basis for issuing technical specifications for a development and launch in 1993. This paper presents the results of a study issued by ESA on possible options for a DRS System, concentrating on the comparison between a centralized and a decentralized data distribution concept. After recalling the space programmes foreseen in Europe, the paper discusses the architecture and design of the various elements of the System: space segment, DRS ground segment and user ground segment for different options of data dissemination.

  19. Centralized vs decentralized options for an European Data Relay Satellite system

    Science.gov (United States)

    Saint Aubert, S.; Hervieux, M.; Perbos, J. L.; Saggese, E.; Soprano, C.

    1985-10-01

    The European Data Relay Satellite (DRS) is now being planned to support future European missions in the nineties and in particular the various elements of the in-orbit infrastructure. Studies are being conducted to investigate the usefulness of the relay system as well as to provide the basis for issuing technical specifications for a development and launch in 1993. This paper presents the results of a study issued by ESA on possible options for a DRS System, concentrating on the comparison between a centralized and a decentralized data distribution concept. After recalling the space programs foreseen in Europe, the paper discusses the architecture and design of the various elements of the System: space segment, DRS ground segment, and user ground segment for different options of data dissemination.

  20. Toxic Hazards Research Unit Annual Technical Report: 1984

    Science.gov (United States)

    1984-09-01

    exposed to TOCP exhibited the classic lesions of delayed neuropathy (Smith and Lillie, 1931; Barnes and Denz, 1953; (avanagh, 1954; and Fenton , 1955...Safety of *.i Chemicals in Food, Drugs, and Cosmetics , The staff of the Divi- sion of Pharmacology of the Federal Food and Drug Administration, Austin...Annual Technical Report: 1967, AMRL-TR-67-137 (AD 834723), Aerospace Medical Research Laboratory, Wright-Patterson Air Force Base, Ohio. Fenton , J. C

  1. Feasibility Study for the Ivano-Frankivsk District Heating Repowering: Analysis of Options

    Energy Technology Data Exchange (ETDEWEB)

    Markel, L.; Popelka, A.; Laskarevsky, V.

    2002-03-20

    Part of the U.S. Initiative on Joint Implementation with the Ukraine Inter-Ministerial Commission on Climate Change, financed by the US Department of Energy. The project was implemented by a team consisting of the US company SenTech, Inc. and the Ukrainian company Esco-West. The main objective of the effort was to assess available alternatives of Ivano-Frankivsk (I-F) District Heating repowering and provide information for I-F's investment decision process. This study provides information on positive and negative technical and economic aspects of available options. Three options were analyzed for technical merit and economic performance: 1. Installation of cogeneration system based on Gas Turbine (GT) and Heat Recovery Heat Exchanger with thermal capacity of 30 MW and electrical capacity of 13.5 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. Equipment in this Option was sized for longest operating hours, about 8000 based on the available summer baseload. 2. Installation of Gas Turbine Combined Cycle (GTCC) and Heat Recovery Steam Generator (HRSG) with thermal capacity 45 MW and electrical capacity of 58.7 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. The equipment was sized for medium, shoulder season thermal load, and some cooling was assumed during the summer operation for extension of operating hours for electricity production. 3. Retrofit of six existing boilers (NGB) with total thermal capacity of 255.9 MW by installation of modern control system and minor upgrades. This option assumes only heat production with minimum investment. The best economic performance and the largest investment cost would result from alternative GTCC. This alternative has positive Net Present Value (NPV) with discount rate lower than about 12%, and has IRR slightly above 12%. The

  2. Technical evaluation of the electrical, instrumentation, and control design aspects of the proposed license amendment Revision 1 for single-loop operation of Browns Ferry Nuclear Plants (Docket No. 50-259, Unit 1; Docket No. 50-260, Unit 2; Docket No. 50-296, Unit 3)

    International Nuclear Information System (INIS)

    Donich, T.R.

    1983-01-01

    This report documents the technical evaluation of the proposed changes to the plant reactor protection system by the licensee of Browns Ferry Nuclear Power Station, Units 1, 2, and 3, to account for single-loop plant operation. This evaluation is restricted to only the electrical, instrumentation and control design aspects of proposed changes to the plant technical specifications for single-loop operation beyond 24 hours. Conclusion is that the license amendment for single-loop operation has met the review criteria provided sufficient administrative controls are in effect, and any anomalous control room indicators are corrected or warning-tagged for the duration of single-loop operation

  3. Automobiles and global warming: Alternative fuels and other options for carbon dioxide emissions reduction

    International Nuclear Information System (INIS)

    Sagar, A.D.

    1995-01-01

    Automobiles are a source of considerable pollution at the global level, including a significant fraction of the total greenhouse gas emissions. Alternative fuels have received some attention as potential options to curtail the carbon dioxide emissions from motor vehicles. This article discusses the feasibility and desirability (from a technical as well as a broader environmental perspective) of the large-scale production and use of alternative fuels as a strategy to mitigate automotive carbon dioxide emissions. Other options such as improving vehicle efficiency and switching to more efficient modes of passenger transportation are also discussed. These latter options offer an effective and immediate way to tackle the greenhouse and other pollutant emission from automobiles, especially as the limitations of currently available alternative fuels and the technological and other constraints for potential future alternatives are revealed

  4. Brent Spar abandonment - Best Practicable Environmental Option (BPEO) assessment

    International Nuclear Information System (INIS)

    1994-12-01

    Possible methods of abandoning or re-using the Brent Spar storage and tanker offloading facility following its decommissioning in 1991 are discussed. The report assesses six of the thirteen possible methods, including horizontal dismantling and onshore disposal, vertical dismantling and onshore disposal, in-field disposal, deep water disposal, refurbishment and re-use, and continued maintenance, in order to determine the Best Practicable Environmental Option (BPEO). The BPEO covers technical feasibility risks to health and safety of the work force, environmental impacts, public acceptability and costs. (UK)

  5. Manpower development for safe operation of nuclear power plant. China. Seminar on the technical support functions. Activity: 6.1.1-Task-03. Technical report

    International Nuclear Information System (INIS)

    Groom, S.H.

    1994-01-01

    The workshop which was intended to present operating experiences from utilities with a wide range of numbers of operating nuclear units. The speaker, S.H. Groom, presented N.B. Power's experience with a single nuclear unit, and intended to: Present the objectives, organization, and scope of work of the central and site Technical Service groups within N.B. Power which support the operation of the Point Lepreau NGS; Define responsibilities of, and interfaces between the on-site and the central technical service staff; Recommend methods for the establishment and maintenance of an efficient technical support group for the operation of any nuclear power plant

  6. Cluster: Drafting. Course: Basic Technical Drafting. Research Project.

    Science.gov (United States)

    Sanford - Lee County Schools, NC.

    The set of six units is designed for use with an instructor in basic technical drafting and is also keyed to other texts. Each unit contains several task packages specifying prerequisites, rationale for learning, objectives, learning activities to be supervised by the instructor, and learning practice. The units cover: pictorial drawing; screw…

  7. Moderator Configuration Options for ESS

    DEFF Research Database (Denmark)

    Zanini, L.; Batkov, K.; Klinkby, Esben Bryndt

    2016-01-01

    The current, still evolving status of the design and the optimization work for the moderator configuration for the European Spallation Source is described. The moderator design has been strongly driven by the low-dimensional moderator concept recently proposed for use in spallation neutron sources...... or reactors. Quasi-two dimensional, disc- or tube-shaped moderators,can provide strong brightness increase (factor of 3 or more) with respect to volume para-H2moderators, which constitute the reference, state-of-the-art technology for high-intensity coupled moderators. In the design process other, more...... conventional, principles were also considered,such as the importance of moderator positioning, of the premoderator, and beam extraction considerations. Different design and configuration options are evaluated and compared with the reference volume moderator configuration described in the ESS Technical Design...

  8. Spent fuel storage - dry storage options and issues

    International Nuclear Information System (INIS)

    Akins, M.J.

    2007-01-01

    The increase in the number of nuclear energy power generation facilities will require the ability to store the spent nuclear fuel for a long period until the host countries develop reprocessing or disposal options. Plants have storage pools which are closely associated with the operating units. These are excellent for short term storage, but require active maintenance and operations support which are not desirable for the long term. Over the past 25 years, dry storage options have been developed and implemented throughout the world. In recent years, protection against terrorist attack has become an increasing source of design objectives for these facilities, as well as the main nuclear plant. This paper explores the current design options of dry storage cask systems and examines some of the current design issues for above ground , in-ground, or below-ground storage of spent fuel in dry casks. (author)

  9. Maximizing profits associated with abandonment decisions and options

    International Nuclear Information System (INIS)

    Antia, D.D.J.

    1994-01-01

    Economic strategies which are designed to maximize profits associated with abandonment decisions and options focus on: extending field life; offsetting of economic risks onto a third party; reuse of facilities and infrastructure; expansion of associated secondary processing and distribution capabilities and usage; and the sale of abandonment units to a third party

  10. The incremental cost of switching from Option B to Option B+ for the prevention of mother-to-child transmission of HIV.

    Science.gov (United States)

    O'Brien, Lisa; Shaffer, Nathan; Sangrujee, Nalinee; Abimbola, Taiwo O

    2014-03-01

    To estimate the incremental cost over 5 years of a policy switch from the Option B to the Option B+ protocol for the prevention of mother-to-child transmission (PMTCT) of the human immunodeficiency virus (HIV). Data from cost studies and other published sources were used to determine the cost, per woman and per cohort (1000 breastfeeding and 1000 non-breastfeeding women), of switching from Option B (maternal triple antiretroviral [ARV] regimen during pregnancy and breastfeeding plus daily nevirapine for the infant for 6 weeks) to Option B+ (maternal triple ARV regimen initiated during pregnancy and continued for life). The variables used to model the different scenarios were maternal CD4+ T lymphocyte (CD4+ cell) count (350-500 versus > 500 cells/µl), rate of decline in CD4+ cells (average, rapid, slow), breastfeeding status (yes, no) and breastfeeding duration (12, 18 or 24 months). For women with CD4+ cell counts of 350-500 cells/µl, the incremental cost per 1000 women was 157,345 United States dollars (US$) for breastfeeding women and US$ 92,813 for non-breastfeeding women. For women with CD4+ cell counts > 500 cells/µl, the incremental cost per 1000 women ranged from US$ 363,443 to US$ 484,591 for breastfeeding women and was US$ 605,739 for non-breastfeeding women. From a cost perspective, a policy switch from Option B to Option B+ is feasible in PMTCT programme settings where resources are currently being allocated to Option B.

  11. Deep UV to NIR Space Telescopes and Exoplanet Coronagraphs: A Trade Study on Throughput, Polarization, Mirror Coating Options and Requirements

    Science.gov (United States)

    Balasubramanian, Kunjithapatham; Shaklan, Stuart; Give'on, Amir; Cady, Eric; Marchen, Luis

    2011-01-01

    The NASA Exoplanet program and the Cosmic Origins program are exploring technical options to combine the visible to NIR performance requirements of a space coronagraph with the general astrophysics requirements of a space telescope covering the deep UV spectrum. Are there compatible options in terms of mirror coatings and telescope architecture to satisfy both goals? In this paper, we address some of the main concerns, particularly relating to polarization in the visible and throughput in the UV. Telescope architectures employing different coating options compatible with current technology are considered in this trade study.

  12. Current practices and options for confinement of uranium mill tailings

    International Nuclear Information System (INIS)

    1981-01-01

    At the United Nations Conference on the Human Environment, which took place in Stockholm from 4 to 6 June 1972, national governments were asked to explore, with the International Atomic Energy Agency and other appropriate international organizations, international co-operation on radioactive waste matters including those of mining and tailings disposal. Since that time the IAEA has been active in the field of uranium and thorium mill tailings management. As part of this activity, the present report describes current practices and options for confinement of uranium mill tailings. It is addressed to technical and administrative personnel who are involved in planning and implementing national and industrial programmes on the management of such tailings. In 1974 and 1975 the IAEA convened meetings of experts to review matters of interest and importance in the management of uranium and thorium mine and mill tailings. These activities led to the publication in 1976 of Management of Wastes from the Mining and Milling of Uranium and Thorium Ores, a Code of Practice and Guide to the Code, IAEA Safety Series No. 44. As a continuation of this activity, the IAEA is here dealing more specifically with the design and siting considerations for the management of uranium mill tailings

  13. Technical Diagnostics of Ventilation Units for Energy Efficiency and Safety of Operation

    Directory of Open Access Journals (Sweden)

    Kuzin Evgeny

    2017-01-01

    Full Text Available The article considers the questions of application of technical diagnostics fan installations methods for providing safe operation, the system of the technical maintenance improvement and repair. Due to the feet that one of the most important aspects in fan operation in mining is energy efficiency and energy saving, the lack of the data in the control of the level in vibration of stationary sensors is shown. The necessity of taking into account the geometric parameters of the intake channel has been shown, and also the necessity of creation of the reference masks for the assessment of technical condition and energy efficiency when operating fan installations in mining. The results of technical diagnostics of the main fans using the methods of vibration diagnostics are provided. Aspects of vibration at characteristic points are shown. The necessity for further accumulation of data characterizing vibration for adjustment of the reference masks and more accurate detection of defects and deviations from the energy-efficient mode of operation of the fan installations is given.

  14. Technical Diagnostics of Ventilation Units for Energy Efficiency and Safety of Operation

    Science.gov (United States)

    Kuzin, Evgeny; Shahmanov, Vitality; Dubinkin, Dmitriy

    2017-11-01

    The article considers the questions of application of technical diagnostics fan installations methods for providing safe operation, the system of the technical maintenance improvement and repair. Due to the feet that one of the most important aspects in fan operation in mining is energy efficiency and energy saving, the lack of the data in the control of the level in vibration of stationary sensors is shown. The necessity of taking into account the geometric parameters of the intake channel has been shown, and also the necessity of creation of the reference masks for the assessment of technical condition and energy efficiency when operating fan installations in mining. The results of technical diagnostics of the main fans using the methods of vibration diagnostics are provided. Aspects of vibration at characteristic points are shown. The necessity for further accumulation of data characterizing vibration for adjustment of the reference masks and more accurate detection of defects and deviations from the energy-efficient mode of operation of the fan installations is given.

  15. [Alaskan commodities irradiation project: An options analysis study

    International Nuclear Information System (INIS)

    Zarling, J.P.; Swanson, R.B.; Logan, R.R.

    1989-09-01

    The ninety-ninth US Congress commissioned a six-state food irradiation research and development program to evaluate the commercial potential of this technology. Hawaii, Washington, Iowa, Oklahoma and Florida as well as Alaska have participated in the national program; various food products including fishery products, red meats, tropical and citrus fruits and vegetables have been studied. The purpose of the Alaskan study was to review and evaluate those factors related to the technical and economic feasibility of an irradiator in Alaska. This options analysis study will serve as a basis for determining the state's further involvement in the development of food irradiation technology

  16. 12 CFR 411.300 - Professional and technical services.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Professional and technical services. 411.300 Section 411.300 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES NEW RESTRICTIONS ON LOBBYING Activities by Other Than Own Employees § 411.300 Professional and technical services. (a) The prohibition on...

  17. 12 CFR 411.205 - Professional and technical services.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Professional and technical services. 411.205 Section 411.205 Banks and Banking EXPORT-IMPORT BANK OF THE UNITED STATES NEW RESTRICTIONS ON LOBBYING Activities by Own Employees § 411.205 Professional and technical services. (a) The prohibition on the use of...

  18. Advances in heavy water reactor technology. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    1997-11-01

    This IAEA meeting addressed both the status of national programmes and technical topics including advances in plant and system design and new plant features, development of pressure tube technologies, fuel and fuel cycle options, computer code development and verification, and safety and accident analysis

  19. Critical evaluation of the nonradiological environmental technical specifications. Volume 4. San Onofre Nuclear Generating Station, Unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-08-10

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Unit 1 of the San Onofre Nuclear Generating Station (SONGS 1) was conducted for the Office of Nuclear Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected during 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The ecological evaluation was directed toward reviewing the strengths and weaknesses of the various sampling programs designed to monitor the planktonic, benthic, and nektonic communities inhabiting the inshore coastal area in the vicinity of San Onofre.

  20. Critical evaluation of the nonradiological environmental technical specifications. Volume 4. San Onofre Nuclear Generating Station, Unit 1

    International Nuclear Information System (INIS)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-01-01

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Unit 1 of the San Onofre Nuclear Generating Station (SONGS 1) was conducted for the Office of Nuclear Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected during 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The ecological evaluation was directed toward reviewing the strengths and weaknesses of the various sampling programs designed to monitor the planktonic, benthic, and nektonic communities inhabiting the inshore coastal area in the vicinity of San Onofre

  1. Foreign Assistance: Treasury's Technical Assistance Program

    National Research Council Canada - National Science Library

    Ford, Jess

    1999-01-01

    After the collapse of communism in Central Europe and the dissolution of the Soviet Union, the United States developed programs of technical assistance to help countries transition to market economies and democracy...

  2. Repurposing Used Electric Car Batteries: A Review of Options

    Science.gov (United States)

    DeRousseau, Mikaela; Gully, Benjamin; Taylor, Christopher; Apelian, Diran; Wang, Yan

    2017-09-01

    In the United States, millions of electric and hybrid vehicles have cumulatively been sold. Although the batteries in these vehicles are expected to last at least 8 years, end-of-life options must still be considered. There are several possible options for battery packs from electric vehicles when they reach end-of-life, including remanufacturing, repurposing for a different application, and recycling. Remanufacturing is the most desirable end-of-life scenario but is the most stringent in terms of battery quality. Recycling is less desirable because there are larger material and energy losses that occur in the process. Repurposing batteries for a different use lies between these two scenarios in terms of desirability. This review paper focuses on non-automotive reuse and explores several options for using electric car battery packs in grid energy storage applications.

  3. 78 FR 19552 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Science.gov (United States)

    2013-04-01

    ... that deliver 10 physical shares on SPDR S&P 500 (``SPY''), Apple, Inc. (``AAPL''), SPDR Gold Trust... CBOE Rule 5.5.22. Standard equity and exchange-traded fund (``ETF'') option contracts have a unit of... contract characteristics as standard equity and ETF options, including exercise style. Accordingly, the...

  4. Energy priorities and options for the European Community

    International Nuclear Information System (INIS)

    Audland, C.J.

    1984-01-01

    The paper discusses the energy priorities and options for the European Community. Reasons for the recent improvement in the efficiency of energy use are briefly discussed, as well as the outlook for 1990, priorities for the future, solid fuels. natural gas, electricity and nuclear energy. Energy policy considerations in the United Kingdom are also mentioned. (U.K.)

  5. F/H effluent treatment facility. Technical data summary

    International Nuclear Information System (INIS)

    Ryan, J.P.; Stimson, R.E.

    1984-12-01

    This document provides the technical basis for the design of the facility. Some of the sections are described with options to permit simplification of the process, depending on the effluent quality criteria that the facility will have to meet. Each part of the F/HETF process is reviewed with respect to decontamination and concentration efficiency, operability, additional waste generation, energy efficiency, and compatability with the rest of the process

  6. Conversion of transuranic waste to low level waste by decontamination: a technical and economic evaluation

    International Nuclear Information System (INIS)

    Allen, R.P.; Hazelton, R.F.

    1984-12-01

    A study was conducted to evaluate the technical and economic feasibility of using in-situ decontamination techniques to convert glove boxes and other large TRU-contaminated components directly into LLW. The results of the technical evaluation indicate that in-situ decontamination of these types of components to non-TRU levels is technically feasible. Applicable decontamination techniques include electropolishing, hand scrubbing, chemical washes/sprays, strippable coatings and Freon spray-cleaning. The removal of contamination from crevices and other holdup areas remains a problem, but may be solved through further advances in decontamination technology. Also, the increase in the allowable maximum TRU level from 10 nCi/g to 100 nCi/g as defined in DOE Order 5820.2 reduces the removal requirement and facilitates measurement of the remaining quantities. The major emphasis of the study was on a cost/benefit evaluation that included a review and update of previous analyses and evaluations of TRU-waste volume reduction and conversion options. The results of the economic evaluation show, for the assumptions used, that there is a definite cost incentive to size reduce large components, and that decontamination of sectioned material has become cost competitive with the size reduction options. In-situ decontamination appears to be the lowest cost option when based on routine-type operations conducted by well-trained and properly equipped personnel. 16 references, 1 figure, 7 tables

  7. Human research ethics committees in technical universities.

    Science.gov (United States)

    Koepsell, David; Brinkman, Willem-Paul; Pont, Sylvia

    2014-07-01

    Human research ethics has developed in both theory and practice mostly from experiences in medical research. Human participants, however, are used in a much broader range of research than ethics committees oversee, including both basic and applied research at technical universities. Although mandated in the United States, the United Kingdom, Canada, and Australia, non-medical research involving humans need not receive ethics review in much of Europe, Asia, Latin America, and Africa. Our survey of the top 50 technical universities in the world shows that, where not specifically mandated by law, most technical universities do not employ ethics committees to review human studies. As the domains of basic and applied sciences expand, ethics committees are increasingly needed to guide and oversee all such research regardless of legal requirements. We offer as examples, from our experience as an ethics committee in a major European technical university, ways in which such a committee provides needed services and can help ensure more ethical studies involving humans outside the standard medical context. We provide some arguments for creating such committees, and in our supplemental article, we provide specific examples of cases and concerns that may confront technical, engineering, and design research, as well as outline the general framework we have used in creating our committee. © The Author(s) 2014.

  8. HTTR criticality calculations with SCALE6: Studies of various geometric and unit-cell options in modeling

    Energy Technology Data Exchange (ETDEWEB)

    Wang, J. Y.; Chiang, M. H.; Sheu, R. J.; Liu, Y. W. H. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., Hsinchu 30013, Taiwan (China)

    2012-07-01

    The fuel element of the High Temperature Engineering Test Reactor (HTTR) presents a doubly heterogeneous geometry, where tiny TRISO fuel particles dispersed in a graphite matrix form the fuel region of a cylindrical fuel rod, and a number of fuel rods together with moderator or reflector then constitute the lattice design of the core. In this study, a series of full-core HTTR criticality calculations were performed with the SCALE6 code system using various geometric and unit-cell options in order to systematically investigate their effects on neutronic analysis. Two geometric descriptions (ARRAY or HOLE) in SCALE6 can be used to construct a complicated and repeated model. The result shows that eliminating the use of HOLE in the HTTR geometric model can save the computation time by a factor of 4. Four unit-cell treatments for resonance self-shielding corrections in SCALE6 were tested to create problem-specific multigroup cross sections for the HTTR core model. Based on the same ENDF/B-VII cross-section library, their results were evaluated by comparing with continuous-energy calculations. The comparison indicates that the INFHOMMEDIUM result overestimates the system multiplication factor (k{sub eff}) by 55 mk, whereas the LATTICECELL and MULTIREGION treatments predict the k{sub eff} values with similar biases of approximately 10 mk overestimation. The DOUBLEHET result shows a more satisfactory agreement, about 4.2 mk underestimation in the k{sub eff} value. In addition, using cell-weighted cross sections instead of an explicit modeling of TRISO particles in fuel region can further reduce the computation time by a factor of 5 without sacrificing accuracy. (authors)

  9. Options for the reduction of gases emissions of greenhouse effect (GEI), Colombia 1998 -2010

    International Nuclear Information System (INIS)

    Rodriguez M, Humberto; Gonzalez B, Fabio

    1999-01-01

    Taking into account the greenhouse gas emissions for Colombia in year 2010, different options for reduction of GHG emissions were considered. Twenty-four options were evaluated from economical and technical points of view, with a total reduction potential of 31.7 M ton/ year of CO 2 equivalent. About 75% of this potential could be developed in the forestry sector and 25% in energy projects. If the proposed measures can to be implemented, the country's emissions will be 143.5 M ton/year of co2 by 2010: this means that Colombia will have lowered its emissions not only to the 1990 level but down to 14% below this level

  10. Technical feasibility of retrieval within the UK repository concept for ILW/LLW

    International Nuclear Information System (INIS)

    McCall, A.; McKirdy, B.

    2000-01-01

    Nirex is developing a staged, reversible concept for the disposal of ILW and certain LLW in the UK. Within that concept, the retrievability strategy includes the option of keeping open the repository, for an extended period, after all waste has been emplaced. In examining the feasibility of such an approach, a number of key technical issues have been identified and options for addressing these issues have been established. This paper will describe the issues identified and the development of practical solutions for incorporating retrievability within the Nirex concept. (author)

  11. Stakeholder Perceptions of Barriers and Solutions to Significant Expansion of Postsecondary Enrollment Options for High School Students

    Directory of Open Access Journals (Sweden)

    Carl Wozniak

    2013-02-01

    Full Text Available Post-secondary experiences for students still in high school have been promoted as a means to increase academic rigor and create a better-trained workforce. Yet little is known regarding supports needed to significantly increase such options. This study obtained input from 411 stakeholders in one Midwestern state, including 201 district superintendents, 181 high school principals, and 23 college dual enrollment officers regarding their use of these options, their perceptions of barriers to program expansion, and their ranking of possible solutions to overcome the barriers. Findings demonstrate that all parties find postsecondary options of value, with traditional dual enrollment the most used option. Although all groups identified funding as a primary barrier, other systemic barriers were of great concern. Participants suggest that expansion of Advanced Placement and early and middle college programs, financial assistance for dually enrolled students, and increased program availability for career and technical options would be beneficial.Wozniak, Carl, (2012. Stakeholder Perceptions of Barriers and Solutions to Significant Expansion of Postsecondary Enrollment Options for High School Students. 8(2. Retrieved from www.ijepl.org .

  12. Developing a transnational electricity infrastructure offshore: interdependence between technical and regulatory solutions

    NARCIS (Netherlands)

    Hendriks, R.L.; Gibescu, M.; Roggenkamp, M.M.; Kling, W.L.

    2010-01-01

    This paper aims at identifying the options for designing an offshore electricity grid and the legal instruments to create such a grid. It will make a first attempt at presenting the technical and legal considerations which coastal states, EU and national legislators and policy makers should take

  13. Nuclear Options for Industrialized and Developing Countries for 2020 Results of a Forecast Study

    International Nuclear Information System (INIS)

    Loriette, Ph.; Bootz, J.Ph.

    2002-01-01

    The main objective of the project is to detect one or more nuclear options (consisting of one or several sets of reactors and fuel types) which could present a significant interest for the two horizons of 2020 and 2070. In order to attain this objective it is necessary first to define the energetic context for each of the two horizons. For EDF, the short and medium term issues are essentially to pursue the high quality operation of the existing plants and, on the other hand, to prepare the future in the perspective of the progressive park renewal. The project aims at providing an answer to this second issue. In order to provide the best possible answer, the project will have to address other criteria than the usual technical-economical one and consider every possible option. In particular, the analysis will have to integrate all the aspects: environmental, political, sociological, and market oriented. A forecast study will allow to define scenarios leading to the description of the energetic situation at horizons 2020 and 2070. The general framework of the analysis is defined, among others, by the perspectives concerning the existing park lifetime and economic competitiveness, the different types of energies demand, the European electricity market opening context and the international regulations concerning the greenhouse effect gases emissions. At the same time, the knowledge pertaining to the different innovative concepts will be gathered. Today several technical solutions are proposed by the French and foreign makers and R and D organizations, with varying degrees of development or industrialization. Those solutions concern either the reactors, the fuel or the back end of the cycle or the three topics together. It is therefore necessary to gather the acquired knowledge and to follow the development projects of those options. This activity is a technological watch or state of the art survey. Three types of options are to be distinguished: - evolutionary and

  14. Technology assessment of various coal-fuel options

    International Nuclear Information System (INIS)

    Coenen, R.; Findling, B.; Klein-Vielhauer, S.; Nieke, E.; Paschen, H.; Tangen, H.; Wintzer, D.

    1991-01-01

    The technology assessment (TA) study of coal-based fuels presented in this report was performed for the Federal Ministry for Research and Technology. Its goal was to support decision-making of the Federal Ministry for Research and Technology in the field of coal conversion. Various technical options of coal liquefaction have been analyzed on the basis of hard coal as well as lignite -- direct liquefaction of coal (hydrogenation) and different possibilities of indirect liquefaction, that is the production of fuels (methanol, gasoline) by processing products of coal gasification. The TA study takes into consideration the entire technology chain from coal mining via coal conversion to the utilization of coal-based fuels in road transport. The analysis focuses on costs of the various options, overall economic effects, which include effects on employment and public budgets, and on environmental consequences compared to the use of liquid fuels derived from oil. Furthermore, requirements of infrastructure and other problems of the introduction of coal-based fuels as well as prospects for the export of technologies of direct and indirect coal liquefaction have been analyzed in the study. 14 figs., 10 tabs

  15. Bringing biofuels on the market. Options to increase EU biofuels volumes beyond the current blending limits

    Energy Technology Data Exchange (ETDEWEB)

    Kampman, B.; Van Grinsven, A.; Croezen, H. [CE Delft, Delft (Netherlands); Verbeek, R.; Van Mensch, P.; Patuleia, A. [TNO, Delft, (Netherlands)

    2013-07-15

    This handbook on biofuels provides a comprehensive overview of different types of biofuels, and the technical options that exist to market the biofuels volumes expected to be consumed in the EU Member States in 2020. The study concludes that by fully utilizing the current blending limits of biodiesel (FAME) in diesel (B7) and bioethanol in petrol (E10) up to 7.9% share of biofuels in the EU transport sector can be technically reached by 2020. Increasing use of advanced biofuels, particularly blending of fungible fuels into diesel (eg. HVO and BTL) and the use of higher ethanol blends in compatible vehicles (e.g. E20), can play an important role. Also, the increased use of biomethane (in particular bio-CNG) and higher blends of biodiesel (FAME) can contribute. However, it is essential for both governments and industry to decide within 1 or 2 years on the way ahead and take necessary actions covering both, the fuels and the vehicles, to ensure their effective and timely implementation. Even though a range of technical options exist, many of these require considerable time and effort to implement and reach their potential. Large scale implementation of the options beyond current blending limits requires new, targeted policy measures, in many cases complemented by new fuel and vehicle standards, adaptation of engines and fuel distribution, etc. Marketing policies for these vehicles, fuels and blends are also likely to become much more important than in the current situation. Each Member State may develop its own strategy tailored to its market and policy objectives, but the EU should play a crucial facilitating role in these developments.

  16. Technical Specifications, Byron Station, Unit Nos. 1 and 2 (Docket Nos. STN 50-454 and STN 50-455). Appendix A to license No. NPF-37

    International Nuclear Information System (INIS)

    1985-02-01

    The Byron Station, Unit No. 1 and Unit No. 2 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public. Specifications are presented for limiting conditions for operation for the reactor control system, power distribution limits, instrumentation, primary coolant circuit, ECCS, containment systems, plant systems, electrical power systems, refueling operations, radioactive effluents, and radiological environmental monitoring

  17. Follicular unit extraction hair transplant automation: options in overcoming challenges of the latest technology in hair restoration with the goal of avoiding the line scar.

    Science.gov (United States)

    Rashid, Rashid M; Morgan Bicknell, Lindsay T

    2012-09-15

    Follicular unit extraction (FUE) provides many advantages over the strip surgical method of harvesting hair grafts for hair restoration. However, FUE also has its shortcomings because it is a more time intensive approach that results in increased costs and is technically a more challenging technique of hair transplantation. In this manuscript, we seek to share approaches used at our center to help minimize and/or improve on some of the challenges of FUE.

  18. North American natural gas outlook : does gas remain a fuel option for oil sands?

    International Nuclear Information System (INIS)

    George, R.R.

    2003-01-01

    This paper presents a North America natural gas outlook from Purvin and Gertz, an international energy consulting firm that has 30 years experience in providing strategic, commercial and technical advice to the petroleum industry. In particular, this presentation focuses on natural gas market fundamentals and how they may impact on oil sands development. It includes charts and graphs depicting NYMEX natural gas outlooks to July, 2009 and examines how supply will react to major changes in Canada's supply portfolio. It was noted that oil sands development is a driver for natural gas demand in Alberta. The existing regional gas pipeline infrastructure was presented and the market impact on upgrader options was discussed. The author suggests that if gas prices are too high, there are other fuel options for steam and power generation. These include bitumen, asphalt, coke, coal and nuclear. However, these options have additional costs, uncertainties and environmental issues. A key factor for success would be to have a clear understanding of the benefits and risks between these fuel options. 1 tab., 9 figs

  19. The Gel Generator option

    International Nuclear Information System (INIS)

    Boyd, R.E.

    1999-01-01

    The development of a national policy for guaranteeing an ample supply of 99m Tc to nuclear medicine, involves issues which go beyond the means by which radioactivation is achieved. Indeed, in such an exercise the pragmatic dictates of business and the sensitivities of politics must also be taken into account. Furthermore where a preference towards the nuclear reactor or the potential of cyclotrons is being questioned, the debate is incomplete if the only options that are considered are the fission-based 99 Mo generator versus the direct cyclotron production of 99m Tc. There is a third option (also neutron γ-based), an alternative to the fission 99 Mo generator, which ought not be overlooked. The application of low specific activity (n,γ) 99 Mo to a new type of generator, the Gel Generator, has been the focus of much research, particularly in Australia and more recently in China. After the initial concept had been established in the laboratory, the Australian researchers then undertook a comprehensive program of tests on the Gel Generator to assess its potential, either in the clinical laboratory or the centralised radiopharmacy, for supplying 99m Tc suitable for nuclear medicine. The outcome of this program was a clear indication that the Gel Generator innovation had the capability to provide both technical and economic advantages to the nuclear medicine industry. These advantages are described. Since that time the Gel Generator has been selected for routine use in China where it now satisfies more than 30% of the 99m Tc demand. (author)

  20. Review of Nuclear Thermal Propulsion Ground Test Options

    Science.gov (United States)

    Coote, David J.; Power, Kevin P.; Gerrish, Harold P.; Doughty, Glen

    2015-01-01

    High efficiency rocket propulsion systems are essential for humanity to venture beyond the moon. Nuclear Thermal Propulsion (NTP) is a promising alternative to conventional chemical rockets with relatively high thrust and twice the efficiency of highest performing chemical propellant engines. NTP utilizes the coolant of a nuclear reactor to produce propulsive thrust. An NTP engine produces thrust by flowing hydrogen through a nuclear reactor to cool the reactor, heating the hydrogen and expelling it through a rocket nozzle. The hot gaseous hydrogen is nominally expected to be free of radioactive byproducts from the nuclear reactor; however, it has the potential to be contaminated due to off-nominal engine reactor performance. NTP ground testing is more difficult than chemical engine testing since current environmental regulations do not allow/permit open air testing of NTP as was done in the 1960's and 1970's for the Rover/NERVA program. A new and innovative approach to rocket engine ground test is required to mitigate the unique health and safety risks associated with the potential entrainment of radioactive waste from the NTP engine reactor core into the engine exhaust. Several studies have been conducted since the ROVER/NERVA program in the 1970's investigating NTP engine ground test options to understand the technical feasibility, identify technical challenges and associated risks and provide rough order of magnitude cost estimates for facility development and test operations. The options can be divided into two distinct schemes; (1) real-time filtering of the engine exhaust and its release to the environment or (2) capture and storage of engine exhaust for subsequent processing.

  1. Technical evaluation of the alternate to the keylock control to the bypass valves for the Davis-Besse nuclear power plant, Unit 1

    International Nuclear Information System (INIS)

    Ibarra, J.G.

    1979-09-01

    This report documents the technical evaluation of the alternate to the keylock control to the bypass valves for the Davis-Besse nuclear power plant, Unit 1. The review criteria are inferred from the NRC Reactor Safety Study (WASH-1400) and the Safety Evaluation Report for Davis-Besse. This report is supplied as part of the Selected Electrical, Instrumentation, and Control Systems Issues Program being conducted for the US Nuclear Regulatory Commission by Lawrence Livermore Laboratory

  2. The Future Potential of Waver Power in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Mirko Previsic; Jeff Epler; Maureen Hand; Donna Heimiller; Walter Short; Kelly Eurek

    2012-09-20

    The theoretical ocean wave energy resource potential exceeds 50% of the annual domestic energy demand of the United States, is located close to coastal population centers, and, although variable in nature, may be more consistent and predictable than some other renewable generation technologies. As a renewable electricity generation technology, ocean wave energy offers a low air pollutant option for diversifying the U.S. electricity generation portfolio. Furthermore, the output characteristics of these technologies may complement other renewable technologies. This study addresses the following: (1) The theoretical, technical and practical potential for electricity generation from wave energy (2) The present lifecycle cost profile (Capex, Opex, and Cost of Electricity) of wave energy conversion technology at a reference site in Northern California at different plant scales (3) Cost of electricity variations as a function of deployment site, considering technical, geo-spatial and and electric grid constraints (4) Technology cost reduction pathways (5) Cost reduction targets at which the technology will see significant deployment within US markets, explored through a series of deployment scenarios RE Vision Consulting, LLC (RE Vision), engaged in various analyses to establish current and future cost profiles for marine hydrokinetic (MHK) technologies, quantified the theoretical, technical and practical resource potential, performed electricity market assessments and developed deployment scenarios. RE Vision was supported in this effort by NREL analysts, who compiled resource information, performed analysis using the ReEDSa model to develop deployment scenarios, and developed a simplified assessment of the Alaska and Hawaii electricity markets.

  3. A technical analysis of the IAEA nuclear safeguards

    International Nuclear Information System (INIS)

    Yoon, J. W.

    1998-01-01

    In the post-Cold War era, the threats of horizontal nuclear proliferation emerge as the forefront security issue while the nuclear arms races among existing nuclear weapon states reduce to a remarkable extent. In this context, there arises lots of research attention to the IAEA nuclear safeguards which have been viewed as the core of international monitoring on the clandestine nuclear activities of potential proliferators. However, previous attention tended to highlight the political aspects of the IAEA nuclear safeguards, centering on the possibilities and limitations of the IAEA's inspection authority. In contrast, this paper purports to focus on the technical aspects of the IAEA nuclear safeguards, so it can show the intrinsic problems of those safeguards in stemming the proliferation of nuclear weapons. This paper mainly deals with the technical objectives and options of the IAEA nuclear safeguards, the technical indices of clandestine nuclear activities, and some measures to improve the efficacy of the IAEA nuclear safeguards. Hopefully, this paper is expected to lead us to approach the issue of the North Korean nuclear transparency from the technical perspective as well as the political one

  4. GLOBAL 2009: Closing speech - the bulk of technical sessions

    International Nuclear Information System (INIS)

    Greneche, D.

    2009-01-01

    The author proposes an overview of the content of the hundred technical sessions of the GLOBAL 2009 conference. Thus, he addresses the twelve main issues: the upstream part of the fuel cycle, the present status of used fuel recycling, the waste management strategies and technologies, the transportation and storage of used fuels and radioactive materials, the definitive storage of nuclear wastes, the new technologies for fuel recycling, advanced designs of reactor cores and fuel management, long life radionuclide transmutation systems, the non proliferation issue, material management and options for sustainable fuel cycles, dismantling, decommissioning and resulting material management, transverse topics (technical-economic studies, nuclear energy applications other than electricity production, challenges of sustainable development of nuclear energy, advanced researches)

  5. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  6. A nuclear fuel cycle system dynamic model for spent fuel storage options

    International Nuclear Information System (INIS)

    Brinton, Samuel; Kazimi, Mujid

    2013-01-01

    Highlights: • Used nuclear fuel management requires a dynamic system analysis study due to its socio-technical complexity. • Economic comparison of local, regional, and national storage options is limited due to the public financial information. • Local and regional options of used nuclear fuel management are found to be the most economic means of storage. - Abstract: The options for used nuclear fuel storage location and affected parameters such as economic liabilities are currently a focus of several high level studies. A variety of nuclear fuel cycle system analysis models are available for such a task. The application of nuclear fuel cycle system dynamics models for waste management options is important to life-cycle impact assessment. The recommendations of the Blue Ribbon Committee on America’s Nuclear Future led to increased focus on long periods of spent fuel storage [1]. This motivated further investigation of the location dependency of used nuclear fuel in the parameters of economics, environmental impact, and proliferation risk. Through a review of available literature and interactions with each of the programs available, comparisons of post-reactor fuel storage and handling options will be evaluated based on the aforementioned parameters and a consensus of preferred system metrics and boundary conditions will be provided. Specifically, three options of local, regional, and national storage were studied. The preliminary product of this research is the creation of a system dynamics tool known as the Waste Management Module (WMM) which provides an easy to use interface for education on fuel cycle waste management economic impacts. Initial results of baseline cases point to positive benefits of regional storage locations with local regional storage options continuing to offer the lowest cost

  7. Exotic Options: a Chooser Option and its Pricing

    Directory of Open Access Journals (Sweden)

    Raimonda Martinkutė-Kaulienė

    2012-12-01

    Full Text Available Financial instruments traded in the markets and investors’ situation in such markets are getting more and more complex. This leads to more complex derivative structures used for hedging that are harder to analyze and which risk is harder managed. Because of the complexity of these instruments, the basic characteristics of many exotic options may sometimes be not clearly understood. Most scientific studies have been focused on developing models for pricing various types of exotic options, but it is important to study their unique characteristics and to understand them correctly in order to use them in proper market situations. The paper examines main aspects of options, emphasizing the variety of exotic options and their place in financial markets and risk management process. As the exact valuation of exotic options is quite difficult, the article deals with the theoretical and practical aspects of pricing of chooser options that suggest a broad range of usage and application in different market conditions. The calculations made in the article showed that the price of the chooser is closely correlated with the choice time and low correlated with its strike price. So the first mentioned factor should be taken into consideration when making appropriate hedging and investing decisions.

  8. Technical evolution and operation of French CO2 cooled reactors (UNGG)

    International Nuclear Information System (INIS)

    Berthion, Y.

    1986-10-01

    The technical evolution of the five French CO 2 cooled reactors (UNGG) from 1981 to 1986 needs to be outlined. These technical evolutions concerned the fuel element of Bugey 1 which is now slightly enriched, as well as the load reduction operation required by the grid. In addition work in underway to increase the safety at the two St Laurent units, or to repair the hot steel upper-structures of Chinon-3 unit

  9. Balancing human and technical reliability in the design of advanced nuclear reactors

    International Nuclear Information System (INIS)

    Papin, Bernard

    2011-01-01

    Highlights: ► Human factors exigencies are often overseen during the early design phases of NPP. ► Optimization of reactors safety is only based on technical reliability considerations. ► The search for more technical reliability often leads to more system complexity. ► System complexity is a major contributor to the operator's poor performance. ► Our method enables to assess plant complexity and it's impact on human performance. - Abstract: The strong influence of human factors (HF) on the safety of nuclear facilities is nowadays recognised and the designers are now enforced to consider HF requirements in the design of new facilities. Yet, this consideration of human factors requirements is still more or less restricted to the latest phases of the projects, essentially for the design of human-system interfaces (HSI's) and control rooms, although the design options influencing at most the human performance in operation are indeed fixed during the very early phases of the new reactors projects. The main reason of this late consideration of HF is that there exist few methods and models for anticipating the influence of fundamental design options on the future performance of operation teams. This paper describes a set of new tools permitting (i) determination of the impact of the fundamental process design options on the future activity of the operation teams and (ii) assessment of the influence of these operational constraints on teams performance. These tools are intended to guide the design of future 4th generation (GEN4) reactors, within the frame of a global risk-informed design approach, considering technical and human reliability exigencies in a balanced way.

  10. Stricturoplasty—a bowel-sparing option for long segment small bowel Crohn's disease

    OpenAIRE

    Limmer, Alexandra M.; Koh, Hoey C.; Gilmore, Andrew

    2017-01-01

    Abstract Stricturoplasty is a surgical option for management of severe stricturing Crohn's disease of the small bowel. It avoids the need for small bowel resection and the associated metabolic complications. This report contrasts the indications and technical aspects of two different stricturoplasty techniques. Case 1 describes an extensive Michelassi (side-to-side isoperistaltic) stricturoplasty performed for a 100 cm segment of diseased small bowel in a 45-year-old patient. Case 2 describes...

  11. Assessment of Options for the Treatment of Nitrate Salt Wastes at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Robinson, Bruce Alan; Funk, David John; Stevens, Patrice Ann

    2016-01-01

    This paper summarizes the methodology used to evaluate options for treatment of the remediated nitrate salt waste containers at Los Alamos National Laboratory. The method selected must enable treatment of the waste drums, which consist of a mixture of complex nitrate salts (oxidizer) improperly mixed with sWheat Scoop®1, an organic kitty litter and absorbent (fuel), in a manner that renders the waste safe, meets the specifications of waste acceptance criteria, and is suitable for transport and final disposal in the Waste Isolation Pilot Plant located in Carlsbad, New Mexico. A Core Remediation Team was responsible for comprehensively reviewing the options, ensuring a robust, defensible treatment recommendation. The evaluation process consisted of two steps. First, a prescreening process was conducted to cull the list on the basis for a decision of feasibility of certain potential options with respect to the criteria. Then, the remaining potential options were evaluated and ranked against each of the criteria in a consistent methodology. Numerical scores were established by consensus of the review team. Finally, recommendations were developed based on current information and understanding of the scientific, technical, and regulatory situation. A discussion of the preferred options and documentation of the process used to reach the recommended treatment options are presented.

  12. Assessment of Options for the Treatment of Nitrate Salt Wastes at Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, Bruce Alan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Funk, David John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Stevens, Patrice Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-03-17

    This paper summarizes the methodology used to evaluate options for treatment of the remediated nitrate salt waste containers at Los Alamos National Laboratory. The method selected must enable treatment of the waste drums, which consist of a mixture of complex nitrate salts (oxidizer) improperly mixed with sWheat Scoop®1, an organic kitty litter and absorbent (fuel), in a manner that renders the waste safe, meets the specifications of waste acceptance criteria, and is suitable for transport and final disposal in the Waste Isolation Pilot Plant located in Carlsbad, New Mexico. A Core Remediation Team was responsible for comprehensively reviewing the options, ensuring a robust, defensible treatment recommendation. The evaluation process consisted of two steps. First, a prescreening process was conducted to cull the list on the basis for a decision of feasibility of certain potential options with respect to the criteria. Then, the remaining potential options were evaluated and ranked against each of the criteria in a consistent methodology. Numerical scores were established by consensus of the review team. Finally, recommendations were developed based on current information and understanding of the scientific, technical, and regulatory situation. A discussion of the preferred options and documentation of the process used to reach the recommended treatment options are presented.

  13. Radiologic protection: technical and legal aspects

    International Nuclear Information System (INIS)

    Pinto, A.V.A.

    1987-01-01

    Radiologic units are described with the aim to decodify the technical dosimetric language. The legal aspect of radiologic protection in Brazil is reported. Information about help in case of radiation accident is presented. (M.A.C.) [pt

  14. Ozone Layer Research and Technical Resources

    Science.gov (United States)

    Access information on research and technical resources related to ozone layer science. This page provides links to research efforts led by organizations such as the National Oceanic and Atmospheric Administration, the United Nations Environment Program, an

  15. Pricing unit-linked insurance with guaranteed benefit

    Science.gov (United States)

    Iqbal, M.; Novkaniza, F.; Novita, M.

    2017-07-01

    Unit-linked insurance is an investment-linked insurance, that is, the given benefit is the premium investment out-come. Recently, the most widely marketed insurance in the industry is unit-linked insurance with guaranteed benefit. With guaranteed benefit applied, the insurance benefits form is similar to the payoff form of European call option. Thereby, pricing European call option is involved in pricing unit-linked insurance with guaranteed benefit. The dynamics of investment outcome is assumed to follow stochastic interest rate. Hence, change of measure methods is used in pricing unit-linked insurance. The discount factor with stochastic interest rate needs to be modified as well to be zero coupon bond price. Eventually, the insurance premium is calculated by equivalence principle with guaranteed benefit and insurance period explicitly given.

  16. Technical Training: New Course on Microsoft Access 2003 - ECDL Module 5

    CERN Multimedia

    Monique Duval

    2005-01-01

    CERN Technical Training 2005: Learning for the LHC! The CERN Technical Training programme is now proposing a new course on Microsoft Access 2003, designed for people using Access to work with databases. The course programme will include the description of the objects of an Access database, and how to work with Access, creating and using queries, tables, forms and reports. After this course, participants will be at the level of the ECDL Certificate, Database Module 5. Optionally, it will be possible to stand the ECDL examination at the CERN Training Centre. The first scheduled session of this two-day course on Microsoft Access 2003 will take place on March 15-16, 2005. The number of participants to each session is limited to 12. The course will be in English, with an English-French bilingual instructor. The course fee is 400.- CHF per person, scaling down in case of a class of more than 4 participants. The cost of the optional ECDL certification, that will take place at a subsequent date, is 112.- CHF for t...

  17. Technical Training: New Course on Microsoft Access 2003 - ECDL Module 5

    CERN Multimedia

    Monique Duval

    2005-01-01

    CERN Technical Training 2005: Learning for the LHC! The CERN Technical Training programme is now proposing a new course on Microsoft Access 2003, designed for people using Access to work with databases. The course programme will include the description of the objects of an Access database, and how to work with Access, creating and using queries, tables, forms and reports. After this course, participants will be at the level of the ECDL Certificate, Database Module 5. Optionally, it will be possible to stand the ECDL examination at the CERN Training Centre. The first scheduled session of this two-day course on Microsoft Access 2003 will take place on March 15-16, 2005. The number of participants to each session is limited to 12. The course will be in English, with an English-French bilingual instructor. The course fee is 400.- CHF per person, scaling down in case of a class of more than 4 participants. The cost of the optional ECDL certification, that will take place at a subsequent date, is 112.- CHF for ...

  18. Kalaeloa Energy System Redevelopment Options Including Advanced Microgrids.

    Energy Technology Data Exchange (ETDEWEB)

    Hightower, Marion Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Baca, Michael J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); VanderMey, Carissa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    In June 2016, the Department of Energy's (DOE's) Office of Energy Efficiency and Renewable Energy (EERE) in collaboration with the Renewable Energy Branch for the Hawaii State Energy Office (HSEO), the Hawaii Community Development Authority (HCDA), the United States Navy (Navy), and Sandia National Laboratories (Sandia) established a project to 1) assess the current functionality of the energy infrastructure at the Kalaeloa Community Development District, and 2) evaluate options to use both existing and new distributed and renewable energy generation and storage resources within advanced microgrid frameworks to cost-effectively enhance energy security and reliability for critical stakeholder needs during both short-term and extended electric power outages. This report discusses the results of a stakeholder workshop and associated site visits conducted by Sandia in October 2016 to identify major Kalaeloa stakeholder and tenant energy issues, concerns, and priorities. The report also documents information on the performance and cost benefits of a range of possible energy system improvement options including traditional electric grid upgrade approaches, advanced microgrid upgrades, and combined grid/microgrid improvements. The costs and benefits of the different improvement options are presented, comparing options to see how well they address the energy system reliability, sustainability, and resiliency priorities identified by the Kalaeloa stakeholders.

  19. Technical and economical conditions of nuclear energy usage continuation in Lithuania

    International Nuclear Information System (INIS)

    Gylys, J.; Ziedelis, S.; Klevas, V.

    2005-01-01

    The main producer of electric energy in Lithuania is Ignalina NPP with its two RBMK-1500 type reactors. It covers up to 86% of total annual electricity production. The compulsory premature closure of Ignalina NPP due to the decision of EU authorities will decrease maximum power generating capacity to 3273 MW in the year 2010 (slump of 42% in respect to 5698 MW of the year 2000) and it will cause a complex of serious technical, economical, ecological, and social consequences. The most important ones for energy sector are the negative power balance and the shortage of power generating capacity which can emerge straight after closure of the second unit of Ignalina NPP. An attempt has been taken to prove, that the most realistic way for replacement of lost power generating capacities is the construction of new nuclear or combined cycle gas turbine power plants. The results of the comparative analysis of their effectiveness and competitiveness are presented in the paper. Estimating the basic prevailing technical and economical factors and three possible scenarios of economy growth, the changes of power balance and levelised cost of produced electricity are compared. It is demonstrated that a new modern nuclear power plant would be competitive and it would be even a more favourable option in respect to a combined cycle gas turbine power plant due to the relatively lower energy production cost, especially when estimating the possible future growth of price for fossil fuel. (authors)

  20. 19 CFR 213.4 - Disclosure of receipt of technical assistance.

    Science.gov (United States)

    2010-04-01

    ....4 Section 213.4 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.4 Disclosure of receipt of technical assistance. An... received technical assistance from the Trade Remedy Assistance Office in any resulting petition, complaint...

  1. Advanced Technical Drafting (Industrial Arts) Curriculum Guide. Bulletin 1751.

    Science.gov (United States)

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum guide contains materials for a 17-unit course in advanced technical drafting, a followup to the basic technical drafting course in the industrial arts curriculum for grades 10-12. It is intended for use by industrial arts teachers, supervisors, counselors, administrators, and teacher educators. A three-page course overview provides…

  2. Technical evaluation of the electrical, instrumentation, and control design aspects of the low temperature overpressure protection system for the Salem nuclear power plant, Unit 1

    International Nuclear Information System (INIS)

    Laudenbach, D.H.

    1979-03-01

    The technical evaluation is presented for the electrical, instrumentation, and control design aspects of the low temperature overpressure protection system for the Salem nuclear power plant, Unit 1. Design basis criteria used to evaluate the acceptability of the system include operator action, system testability, single failure criterion, and seismic Category I and IEEE Std-279-1971 criteria

  3. Australian Asian Options

    OpenAIRE

    Manuel Moreno; Javier F. Navas

    2003-01-01

    We study European options on the ratio of the stock price to its average and viceversa. Some of these options are traded in the Australian Stock Exchange since 1992, thus we call them Australian Asian options. For geometric averages, we obtain closed-form expressions for option prices. For arithmetic means, we use different approximations that produce very similar results.

  4. Understanding transmission and distribution pricing options and proposals

    International Nuclear Information System (INIS)

    Shalaby, A.

    1998-01-01

    Issues regarding power transmission and distribution pricing were addressed in view of the importance of pricing to electricity restructuring and policy developments. Specific facts, policy directions, options and challenges peculiar to Ontario were highlighted, and recent Ontario legislation affecting the electricity industry was updated. The importance of transmission tariffs to open markets was reviewed with special reference to Canada because of their role in internal restructuring and in gaining fuller access to U.S. markets. The objectives of transmission and distribution pricing, the principles for network pricing, and the range of available options were considered with specific reference to Ontario. In comparing Ontario to other jurisdictions, it was acknowledged that the same problems that plagued other jurisdictions introducing deregulation, are also prominent in Ontario. As has been observed elsewhere, there has been no progress on transmission and distribution pricing options. There are significant implementation and transition challenges waiting for solutions. Issues beyond Ontario, such as trading with the United States, wider reach of the Independent Market Operator, agreements with other IMOs, etc., are still largely unresolved

  5. Automotive turbogenerator design options

    Energy Technology Data Exchange (ETDEWEB)

    Rodgers, C. [ITC, San Diego, CA (United States); McDonald, C. [McDonald Thermal Engineering, La Jolla, CA (United States)

    1998-12-31

    For the small turbogenerator to find reception in the hybrid electric automotive market its major features must be dominated by the following considerations, low cost, high performance, low emissions, compact size and high reliability. Not meeting the first two criteria has been the nemesis of earlier attempts to introduce the small gas turbine for automotive service. With emphasis on the design for low cost and high performance, this paper presents several turbogenerator design flowpath configuration options for the major engine components. The projected evolution from today`s state-of-the-art all metallic engines, to advanced technology ceramic units for service in the early decade of the 21st century, is the major topic of this paper. (author)

  6. Deliberating emission reduction options

    Energy Technology Data Exchange (ETDEWEB)

    Dowd, A.M.; Rodriguez, M.; Jeanneret, T. [Commonwealth Scientific and Industrial Research Organisation CSIRO, 37 Graham Rd, Highett VIC 3190 (Australia); De Best-Waldhober, M.; Straver, K.; Mastop, J.; Paukovic, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands)

    2012-06-15

    For more than 20 years there has been a concerted international effort toward addressing climate change. International conventions, such as the United Nations Foreign Convention on Climate Change (UNFCCC; ratified in 1994), have been established by committed nations seeking to address global climate change through the reduction of greenhouse gases emitted into the Earth's atmosphere (Global CCS Institute, 2011). Long recognised as the most crucial of the greenhouse gases to impact global warming, the majority of carbon dioxide's anthropogenic global emissions are directly related to fuel combustion of which both Australia and the Netherlands' energy production is significantly reliant. Both these nations will need to consider many opinions and make hard decisions if alternative energy options are to be implemented at the scale that is required to meet international emission targets. The decisions that are required not only need to consider the many options available but also their consequences. Along with politicians, policy developers and industry, the general public also need to be active participants in deciding which energy options, and their subsequent consequences, are acceptable for implementation at the national level. Access to balanced and factual information is essential in establishing informed opinions on the many policy options available. Past research has used several methods to measure public perceptions and opinions yet for complex issues, such as emission reduction, some of these methods have shown to be problematic. For example, semi structured interviews can provide data that is flexible and context rich yet is does also come with the limitations such as it seldom provides a practical assessment that can be utilised from researcher to researcher, across disciplines and public participation techniques. Surveys on the other hand usually address these limitations but surveys that do not encourage comparison of information or ask

  7. Deliberating emission reduction options

    Energy Technology Data Exchange (ETDEWEB)

    Dowd, A. M.; Rodriguez, M.; Jeanneret, T. [Commonwealth Scientific and Industrial Research Organisation CSIRO, 37 Graham Rd, Highett VIC 3190 (Australia); De Best-Waldhober, M.; Straver, K.; Mastop, J.; Paukovic, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands)

    2012-06-15

    For more than 20 years there has been a concerted international effort toward addressing climate change. International conventions, such as the United Nations Foreign Convention on Climate Change (UNFCCC; ratified in 1994), have been established by committed nations seeking to address global climate change through the reduction of greenhouse gases emitted into the Earth's atmosphere (Global CCS Institute, 2011). Long recognised as the most crucial of the greenhouse gases to impact global warming, the majority of carbon dioxide's anthropogenic global emissions are directly related to fuel combustion of which both Australia and the Netherlands' energy production is significantly reliant. Both these nations will need to consider many opinions and make hard decisions if alternative energy options are to be implemented at the scale that is required to meet international emission targets. The decisions that are required not only need to consider the many options available but also their consequences. Along with politicians, policy developers and industry, the general public also need to be active participants in deciding which energy options, and their subsequent consequences, are acceptable for implementation at the national level. Access to balanced and factual information is essential in establishing informed opinions on the many policy options available. Past research has used several methods to measure public perceptions and opinions yet for complex issues, such as emission reduction, some of these methods have shown to be problematic. For example, semi structured interviews can provide data that is flexible and context rich yet is does also come with the limitations such as it seldom provides a practical assessment that can be utilised from researcher to researcher, across disciplines and public participation techniques. Surveys on the other hand usually address these limitations but surveys that do not encourage comparison of information or ask participants to

  8. Comparing Item Performance on Three- Versus Four-Option Multiple Choice Questions in a Veterinary Toxicology Course.

    Science.gov (United States)

    Royal, Kenneth; Dorman, David

    2018-06-09

    The number of answer options is an important element of multiple-choice questions (MCQs). Many MCQs contain four or more options despite the limited literature suggesting that there is little to no benefit beyond three options. The purpose of this study was to evaluate item performance on 3-option versus 4-option MCQs used in a core curriculum course in veterinary toxicology at a large veterinary medical school in the United States. A quasi-experimental, crossover design was used in which students in each class were randomly assigned to take one of two versions (A or B) of two major exams. Both the 3-option and 4-option MCQs resulted in similar psychometric properties. The findings of our study support earlier research in other medical disciplines and settings that likewise concluded there was no significant change in the psychometric properties of three option MCQs when compared to the traditional MCQs with four or more options.

  9. The Future of the United States Antarctic Program

    Science.gov (United States)

    Thom, J. E.; Weidner, G. A.; Lazzara, M. A.; Knuth, S. L.; Cassano, J. J.

    2009-04-01

    The last three decades have seen Antarctic surface meteorological observations augmented by an increasing number of automated weather stations (AWS). Since 1980, the University of Wisconsin-Madison has managed an expanding array of AWS in Antarctica that are funded through the United States' National Science Foundation. The AWS network began with six stations and has grown to approximately 60 stations. The majority of the AWS use a custom electronics package designed in the 1970s and modified over approximately 20 years. However, dramatic changes in the electronics industry have led the UW-Madison to transition its AWS to commercial-off-the-shelf (COTS) components capable of integrating on-station storage, varied sensors, multiple data telemetry options, and a flexible operating system. Among the important technical issues arising from adopting a COTS-based AWS system are limited temperature certification for Antarctic conditions; non-standard integration of the varied telecommunications equipment; potentially inflexible data acquisition schemes; and frequent product upgrades, changes, and obsolescence. The UW-Madison presents the current status of its AWS system; its recent experience with new data loggers, sensors, and communication options; and its attempts to obtain a standardized AWS. The intent is to encourage the development of a forum where groups can document their experiences with varied AWS systems in the extreme polar climate. Recent events have added another challenge within the United States Antarctic Program, as it has become clear that budgetary and logistic limitations will drastically impact the AWS program. With logistical costs playing a bigger factor in funding AWS operations, international coordination and cooperation will be important in deploying and maintaining the AWS networks (such as GCOS) that are critical to monitoring the world's climate.

  10. Real options analysis for land use management: Methods, application, and implications for policy.

    Science.gov (United States)

    Regan, Courtney M; Bryan, Brett A; Connor, Jeffery D; Meyer, Wayne S; Ostendorf, Bertram; Zhu, Zili; Bao, Chenming

    2015-09-15

    Discounted cash flow analysis, including net present value is an established way to value land use and management investments which accounts for the time-value of money. However, it provides a static view and assumes passive commitment to an investment strategy when real world land use and management investment decisions are characterised by uncertainty, irreversibility, change, and adaptation. Real options analysis has been proposed as a better valuation method under uncertainty and where the opportunity exists to delay investment decisions, pending more information. We briefly review the use of discounted cash flow methods in land use and management and discuss their benefits and limitations. We then provide an overview of real options analysis, describe the main analytical methods, and summarize its application to land use investment decisions. Real options analysis is largely underutilized in evaluating land use decisions, despite uncertainty in policy and economic drivers, the irreversibility and sunk costs involved. New simulation methods offer the potential for overcoming current technical challenges to implementation as demonstrated with a real options simulation model used to evaluate an agricultural land use decision in South Australia. We conclude that considering option values in future policy design will provide a more realistic assessment of landholder investment decision making and provide insights for improved policy performance. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Real Options in Capital Budgeting. Pricing the Option to Delay and the Option to Abandon a Project

    Directory of Open Access Journals (Sweden)

    Nicoleta Vintila

    2007-07-01

    Full Text Available Traditional discounted cash-flows method for assessing projects assumes that investment decision is an irreversible one, which is not correct. Managers can and must reconsider their initial decision as the new information arises during the project life. This is managerial flexibility and it creates strategic value for a project, only if management takes advantage of the opportunities associated with an analyzed project. Real options represent a new approach in capital budgeting, using the theory of pricing financial options for investments in real assets. In this paper, we emphasize the characteristics and valuation methodologies of real options. The objective in the last section is pricing the option to delay and the option to abandon a project in construction materials field.

  12. Stata 8 Graphics: Options, sub-options and sub-sub-options

    OpenAIRE

    Tim Collier

    2005-01-01

    Stata 8 graphics have changed out of all recognition from that available in earlier versions. It was not just that a whole new array of options and sub-options were introduced, but the graph syntax itself completely changed. Just trying to produce a simple plot of x against y using Stata 7 syntax (graph x y) produced bewildering error messages e.g. xgraph_g.new y: class member function not found r(4023) and the like. If you did succeed in working out the new syntax (graph twoway scatter x y) ...

  13. The incremental cost of switching from Option B to Option B+ for the prevention of mother-to-child transmission of HIV

    Science.gov (United States)

    Shaffer, Nathan; Sangrujee, Nalinee; Abimbola, Taiwo O

    2014-01-01

    Abstract Objective To estimate the incremental cost over 5 years of a policy switch from the Option B to the Option B+ protocol for the prevention of mother-to-child transmission (PMTCT) of the human immunodeficiency virus (HIV). Methods Data from cost studies and other published sources were used to determine the cost, per woman and per cohort (1000 breastfeeding and 1000 non-breastfeeding women), of switching from Option B (maternal triple antiretroviral [ARV] regimen during pregnancy and breastfeeding plus daily nevirapine for the infant for 6 weeks) to Option B+ (maternal triple ARV regimen initiated during pregnancy and continued for life). The variables used to model the different scenarios were maternal CD4+ T lymphocyte (CD4+ cell) count (350–500 versus > 500 cells/µl), rate of decline in CD4+ cells (average, rapid, slow), breastfeeding status (yes, no) and breastfeeding duration (12, 18 or 24 months). Findings For women with CD4+ cell counts of 350–500 cells/µl, the incremental cost per 1000 women was 157 345 United States dollars (US$) for breastfeeding women and US$ 92 813 for non-breastfeeding women. For women with CD4+ cell counts > 500 cells/µl, the incremental cost per 1000 women ranged from US$ 363 443 to US$ 484 591 for breastfeeding women and was US$ 605 739 for non-breastfeeding women. Conclusion From a cost perspective, a policy switch from Option B to Option B+ is feasible in PMTCT programme settings where resources are currently being allocated to Option B. PMID:24700975

  14. Coordinator, Evaluation Unit | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Job Summary The Evaluation Unit Coordinator is expected to: ... with Centre policies and procedures and disseminates information to Unit staff on changes ... Coordinates the planning and organization of technical and administrative meetings ...

  15. MHR fuel cycle options for future sustainability of nuclear power

    International Nuclear Information System (INIS)

    Baxter, Alan; Venneri, Francesco; Rodriguez, Carmelo; Fikani, Michael

    2005-01-01

    The future sustainability of the nuclear option is not significantly tied to the level of resources. For example, current high quality uranium reserves (∼3.34x10 6 tons) are enough for more than 55 years at present consumption rates (IAEA estimate). Doubling of the present uranium ore price (∼$26/kg) could create about a tenfold increase in resources, providing more than 550 years of supply at present rates (World Nuclear Association estimate). There are also thorium reserves which are estimated to be about three times those of uranium, and would allow for a significant increase in annual consumption levels. The key to a sustainable nuclear future is really tied to the political and technical problems of long term waste disposal, and the perceived risks of nuclear weapons proliferation. Thus fuel cycle options for a sustainable nuclear future must address and solve these issues. High temperature, Gas-Cooled, Graphite Moderated, reactors (MHRs) have nuclear and operational characteristics to provide multiple fuel cycle options to solve these issues. Three fuel cycles for the MHD are described in this paper, and their capabilities for meeting a sustainable nuclear future in terms of nuclear waste minimization and destruction, and reduction of proliferation risk, are discussed. (author)

  16. Cost estimate and economic issues associated with the MOX option (prior to DOE's record of decision)

    International Nuclear Information System (INIS)

    Reid, R.L.; Miller, J.W.

    1997-04-01

    Before the January 1997 Record of Decision (ROD), the U.S. Department of Energy Office of Fissile Materials Disposition (DOE-MD) evaluated three technologies for the disposition of ∼50 MT of surplus plutonium from defense-related programs-reactors, immobilization, and deep boreholes. As part of the process supporting the ROD, and comprehensive assessment of technical viability, cost, and schedule was conducted by DOE-MD and its national laboratory contractors. Oak Ridge National Laboratory managed and coordinated the life-cycle cost (LCC) assessment effort for this program. This report discusses the economic analysis methodology and the results for the reactor options considered prior to ROD. A secondary intent of the report is to discuss major technical and economic issues that impact cost and schedule. To evaluate the economics of the reactor option and other technologies on an equitable basis, a set of cost-estimating guidelines and a common cost-estimating format were utilized by all three technology teams. This report includes the major economic analysis assumptions and the comparative constant-dollar and discounted-dollar LCCs for all nine reactor scenarios

  17. Technical assistance and the transfer of remote sensing technology. [for economic development

    Science.gov (United States)

    Chipman, R.

    1977-01-01

    The transfer of technology from industrialized countries to the third world is a very complicated process and one that requires a great deal of research and development. The political and social obstacles to this transfer are generally greater than the technical obstacles, but technical assistance programs have neither the competence nor the inclination to deal with these factors adequately. Funding for technical assistance in remote sensing is now expanding rapidly, and there is a growing need for institutions to study and promote the effective use of this technology for economic development. The United Nations, the Food and Agriculture Organization, the World Bank, the United States Agency for International Development and the Canadian technical assistance agencies take different approaches to the problem and deal with the political pressures in different ways.

  18. LITERATURE SURVEY FOR GROUNDWATER TREATMENT OPTIONS FOR NITRATE IODINE-129 AND URANIUM 200-ZP-1 OPERABLE UNIT HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    BYRNES ME

    2008-06-05

    This literature review presents treatment options for nitrate, iodine-129, and uranium, which are present in groundwater at the 200-ZP-I Groundwater Operable Unit (OU) within the 200 West Area of the Hanford Site. The objective of this review is to determine available methods to treat or sequester these contaminants in place (i.e., in situ) or to pump-and-treat the groundwater aboveground (i.e., ex situ). This review has been conducted with emphasis on commercially available or field-tested technologies, but theoretical studies have, in some cases, been considered when no published field data exist. The initial scope of this literature review included only nitrate and iodine-I 29, but it was later expanded to include uranium. The focus of the literature review was weighted toward researching methods for treatment of nitrate and iodine-129 over uranium because of the relatively greater impact of those compounds identified at the 200-ZP-I OU.

  19. LITERATURE SURVEY FOR GROUNDWATER TREATMENT OPTIONS FOR NITRATE, IODINE-129 AND URANIUM 200-ZP-1 OPERABLE UNIT, HANFORD SITE

    International Nuclear Information System (INIS)

    BYRNES ME

    2008-01-01

    This literature review presents treatment options for nitrate, iodine-129, and uranium, which are present in groundwater at the 200-ZP-I Groundwater Operable Unit (OU) within the 200 West Area of the Hanford Site. The objective of this review is to determine available methods to treat or sequester these contaminants in place (i.e., in situ) or to pump-and-treat the groundwater aboveground (i.e., ex situ). This review has been conducted with emphasis on commercially available or field-tested technologies, but theoretical studies have, in some cases, been considered when no published field data exist. The initial scope of this literature review included only nitrate and iodine-I 29, but it was later expanded to include uranium. The focus of the literature review was weighted toward researching methods for treatment of nitrate and iodine-129 over uranium because of the relatively greater impact of those compounds identified at the 200-ZP-I OU

  20. Career Technical Education Pathways Initiative

    Science.gov (United States)

    California Community Colleges, Chancellor's Office, 2013

    2013-01-01

    California's education system--the largest in the United States--is an essential resource for ensuring strong economic growth in the state. The Career Technical Education Pathways Initiative (referred to as the Initiative in this report), which became law in 2005, brings together community colleges, K-12 school districts, employers, organized…

  1. Technical solutions for low-voltage microgrid concept

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, H.

    2011-07-01

    Future electricity distribution networks with large amount of distributed energy resources will require creation of a totally new smart grid architecture. The micro grid concept is expected to play a major role in the new smart grid architecture. A special feature of microgrids is that during disturbances in the utility grid they can continue operation automatically in the island mode so that electricity supply to microgrid customers can be continued without any interruption. Thereby, the microgrid concept allows the reliability benefit of distributed energy resources to be realized while also fulfilling the future energy efficiency requirements. In this thesis a total technical concept for low-voltage microgrid which could be integrated into the future smart grids has been developed and specified. The key technical challenges of low-voltage microgrids are the transition to island operation, the power quality management and the microgrid protection especially during island operation. Essential part of the concept development involved the development of solutions and operation principles to these key technical challenges of low-voltage microgrids so that all these solutions would be compatible with each other. The role of one central energy storage unit and the location of it are very important in the developed concept from the low-voltage microgrid management and protection point of view. The development work with the related technical challenges was carried out in this thesis with PSCAD simulation software. PSCAD enabled the examination of a simultaneous interaction of different types of distributed energy resource units and loads both in the normal utility grid connected and in the island operation mode of the microgrid. This information from simulations with multiple component configurations was essential when the technical solutions were developed and these studies could not have been undertaken to this extent in a laboratory environment without major

  2. The nuclear option in Canada - why it is gaining ground

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Alizadeh, A.; Hedges, K.R.; Tighe, P.

    2005-01-01

    Over the last five years, the nuclear option in Canada has gone from 'off-the-radar' to an essential part of the energy debate. In Ontario, in particular, building new nuclear plants, along with life-extension of existing plants, has been recommended by government commissions as one of the vital energy-supply options to be pursued. Both life-extension and introduction of new nuclear power plants are complicated by uncertainties in the energy market, and by changes in the organizational and policy environment. Public and policy-maker recognition of the nuclear role are steadily growing, but commercial conditions to support nuclear projects are still difficult to define and obtain. In Canada, as in many OECD countries, the need to add to electricity infrastructure is becoming apparent. Life-extension of existing nuclear units, and projects to build new unit, are being planned. The key challenges, once energy policy issues have been addressed, are mainly commercial. Based on its successful experience with overseas projects such as Quinshan, and on its evolutionary approach to design of new, advanced power plants, AECL is well placed to meet these challenges and launch a new round of nuclear projects. Overall, the Canadian perspective is towards increasing support for the nuclear option. Canada is poised to join the vanguard of the broadening nuclear power expansion. (orig.)

  3. Addressing Trauma in Schools: Multitiered Service Delivery Options for Practitioners

    Science.gov (United States)

    Reinbergs, Erik J.; Fefer, Sarah A.

    2018-01-01

    Hundreds of thousands of children are confronted with traumatic experiences each year in the United States. As trauma-informed care begins to take hold in schools, school mental health providers (e.g., school psychologists, counselors, and social workers) desire concrete service-delivery options for students affected by trauma. This article…

  4. Technical specifications, Braidwood Station, Unit Nos. 1 and 2 (Docket Nos. STN 50-456 and STN 50-457): Appendix ''A'' to License No. NPF-70

    International Nuclear Information System (INIS)

    1987-05-01

    The Braidwood Station, Unit Nos. 1 and 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public. 18 figs., 55 tabs

  5. ACCOUNTING FOR OPTIONS AND ANALYSIS OF USE OF OPTION COMBINATION STRATEGIES

    Directory of Open Access Journals (Sweden)

    I. Derun

    2016-08-01

    Full Text Available The article deals with problems of accounting for options in Ukraine, namely: value expression of initial cost of options, their revaluation, accounting of premiums, financial assets and financial liabilities and variation margin. The paper offers ways of solution of these problems which based on harmonization with IAS 32, IAS 39, IFRS 7 and IFRS 9. The study considers option combination strategies (straddle, strangle, strap, strip and approaches of identification of possible financial results for investors which use these strategies. Examples of possible financial results are provided for buyers and sellers of options which use option combination strategies.

  6. Global plutonium management: A security option

    International Nuclear Information System (INIS)

    Sylvester, K.W.B.

    1998-01-01

    The US surplus plutonium disposition program was created to reduce the proliferation risk posed by the fissile material from thousands of retired nuclear weapons. The Department of Energy has decided to process its Put into a form as secure as Pu in civilian spent fuel. While implementation issues have been considered, a major one (Russian reciprocity) remains unresolved. Russia has made disposition action conditional on extracting the fuel value of its Pu but lacks the infrastructure to do so. Assistance in the construction of the required facilities would conflict with official US policy opposing the development of a Pu fuel cycle. The resulting stagnation provides impetus for a reevaluation of US nonproliferation objectives and Pu disposition options. A strategy for satisfying Russian fuel value concerns and reducing the proliferation risk posed by surplus weapons-grade plutonium (WGPu) is proposed. The effectiveness of material alteration (e.g., isotopic, chemical, etc.hor-ellipsis) at reducing the desire, ability and opportunity for proliferation is assessed. Virtually all the security benefits attainable by material processing can be obtained by immobilizing Pu in large unit size/mass monoliths without a radiation barrier. Russia would be allowed to extract the Pu at a future date for use as fuel in a verifiable manner. Remote tracking capability, if proven feasible, would further improve safeguarding capability. As an alternate approach, the US could compensate Russia for its Pu, allowing it to be disposed of or processed elsewhere. A market based method for pricing Pu is proposed. Surplus Pu could represent access to nuclear fuel at a fixed price at a future date. This position can be replicated in the uranium market and priced using derivative theory. The proposed strategy attempts to meet nonproliferation objectives by recognizing technical limitations and satisfying political constraints

  7. Advanced policy options to regulate sugar-sweetened beverages to support public health.

    Science.gov (United States)

    Pomeranz, Jennifer L

    2012-02-01

    Consumption of sugar-sweetened beverages (SSBs) has increased worldwide. As public health studies expose the detrimental impact of SSBs, consumer protection and public health advocates have called for increased government control. A major focus has been on restricting marketing of SSBs to children, but many innovative policy options--legally defensible ways to regulate SSBs and support public health--are largely unexplored. We describe the public health, economic, and retail marketing research related to SSBs (including energy drinks). We review policy options available to governments, including mandatory factual disclosures, earmarked taxation, and regulating sales, including placement within retail and food service establishments, and schools. Our review describes recent international initiatives and classifies options available in the United States by jurisdiction (federal, state, and local) based on legal viability.

  8. Technical and economic assessment of solar hybrid repowering. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    Public Service Company of New Mexico (PNM) has performed a Technical and Economic Assessment of Solar Hybrid Repowering under funding by the Department of Energy (DOE), the Electric Power Research Institute (EPRI), Western Energy Supply and Transmission (WEST) Associates, and a number of southwestern utilities. Solar hybrid repowering involves placement of solar hardware adjacent to and connected to existing gas- and oil-fueled electric generation units to displace some of or all the fossil fuel normally used during daylight hours. The subject study assesses the technical economic viability of the solar hybrid repowering concept within the southwestern United States and the PNM system. This document is a final report on the study and its results. The study was divided into the six primary tasks to allow a systematic investigation of the concept: (1) market survey and cost/benefit analysis, (2) study unit selection, (3) conceptual design and cost estimates, (4) unit economic analysis, (5) program planning, future phases, and (6) program management. Reeves Station No. 2 at Albuquerque, New Mexico, was selected for repowering with a design goal of 50 percent (25 MWe). The solar system design is based on the 10 MW solar central receiver pilot plant preliminary design for Barstow, California. SAN--1608-4-2 contains the technical drawings. (WHK)

  9. Rehabilitation Options

    Science.gov (United States)

    ... Speech Pathology Occupational Therapy Art Therapy Recreational therapy Neuropsychology Home Care Options Advanced Care Planning Palliative Care ... Speech Pathology Occupational Therapy Art Therapy Recreational therapy Neuropsychology Home Care Options Advanced Care Planning Palliative Care ...

  10. Augmented lagrange hopfield network for economic dispatch with multiple fuel options

    International Nuclear Information System (INIS)

    Dieu, Vo Ngoc; Ongsakul, Weerakorn; Polprasert, Jirawadee

    2011-01-01

    This paper proposes an augmented Lagrange Hopfield network (ALHN) for solving economic dispatch (ED) problem with multiple fuel options. The proposed ALHN method is a continuous Hopfield neural network with its energy function based on augmented Lagrangian function. The advantages of ALHN over the conventional Hopfield neural network are easier use, more general applications, faster convergence, better optimal solution, and larger scale of problem implementation. The method solves the problem by directly searching the most suitable fuel among the available fuels of each unit and finding the optimal solution for the problem based on minimization of the energy function of the continuous Hopfield neural network. The proposed method is tested on systems up to 100 units and the obtained results are compared to those from other methods in the literature. The results have shown that the proposed method is efficient for solving the ED problem with multiple fuel options and favorable for implementation in large scale problems.

  11. Optimal electricity generation system expansion and nuclear power option in Belarus

    International Nuclear Information System (INIS)

    Yakushau, A.; Mikhalevich, A.

    2000-01-01

    After having declared independence, the Republic of Belarus was forced to import 90% of fuel consumed and 25% of electricity. The deficit of peak electric capacity reached 40%. The imported fuel covers the last years because the drop in the production reduced the energy consumption in the Republic but not the needs of the energy sector. Annual payments for imported fuel and electricity are equal to the sum of an annual state budget of Belarus (about 1.5 billion USD) and current debts were not lower 300 million. Comparative analysis of the different scenarios of the electricity generation system expansion showed that an optimum way for electricity generation is installation of the combine cycle units and construction nuclear power plants. The results of the study also showed that the option based on replacement of deficit of the electricity generation by the way of the construction combine cycle units with capacities 450 MW turned out to be the best solution among non nuclear options. (author)

  12. 5 CFR 870.705 - Amount and election of Option B and Option C.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Amount and election of Option B and Option C. 870.705 Section 870.705 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED... Compensationers § 870.705 Amount and election of Option B and Option C. (a) The number of multiples of Option B...

  13. Technical writing versus technical writing

    Science.gov (United States)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  14. Multi-technology option strategy for long term R and D programs on plutonium technologies. Minimizing proliferation risks and preparing for the future

    International Nuclear Information System (INIS)

    Suzuki, Tatsujiro

    1997-01-01

    Plutonium programs worldwide are now facing major economic, political and technical challenges. New strategies need to address two distinctive global concerns: minimizing proliferation risks associated with plutonium use, and keeping the options alive to prepare for uncertain energy future. In order to meet those challenges, this paper proposes the introduction of 'multi-technology option strategy'. Such strategy is designed to keep so-called 'technological readiness' state of plutonium technologies worldwide without committing to a fixed technology option and exploring more innovative various technology options. This paper also suggests that such R and D programs can be coordinated and shared among nations that are interested in future plutonium use, and such cooperation can improve transparency of sensitive R and D programs. (author)

  15. Current situation of Islamabad solid waste dumpsite and options for improvement

    International Nuclear Information System (INIS)

    Baig, M.A.; Elahi, R.E.; Malik, M.

    2003-01-01

    A study was undertaken to assess the existing situation of H-12 dumpsite, where solid waste from Islamabad City is being dumped since 1988, and to propose options for its improvement. The study methodology involved collection of baseline information, topographical survey, analysis of leachate samples, characterization of incoming waste and evaluation of options for rehabilitation and improvement of the site. The results of the study revealed that solid waste dumped at the H-12 dumpsite, which currently receives about 320 tons of solid waste daily, covers an area of 22.4 hectares. The corresponding volume and weight of the waste were found to be 0.45 million m3 and 0.143 million tons, respectively. Specific weight and moisture content of the old dumped waste were found to be 22 percent and 320 kg/m3, respectively. Analysis of leachate samples collected from the dumpsite were found to be highly contaminated. Characterization of solid waste delivered at the site showed that it mainly comprises a mix of construction and demolition waste, food waste and hospital waste thus indicating that material recovery operations would not be feasible. In order to improve and rehabilitate the dumpsite with a view to mitigate its adverse environmental impacts, three options were considered. These include (a) improvement and rehabilitation of the site without making provision for further inflow of waste; (b) improvement and rehabilitation of the dumpsite with provision to receive the waste for a period of another 10 years; and (c) shifting the dumped waste to the proposed Kurri Landfill site. Technical and financial aspects of all the three options are described and recommendations regarding the most environment friendly option are presented. (author)

  16. Construction strategies and lifetime uncertainties for nuclear projects: A real option analysis

    International Nuclear Information System (INIS)

    Jain, Shashi; Roelofs, Ferry; Oosterlee, Cornelis W.

    2013-01-01

    Highlights: • Real options can be used to value flexibility of modular reactors. • Value of NPPs increases with implementation of long term cost reductions. • Levels of uncertainties affect the choice between projects. -- Abstract: Small and medium sized reactors, SMRs (according to IAEA, ‘small’ are reactors with power less than 300 MWe, and ‘medium’ with power less than 700 MWe) are considered as an attractive option for investment in nuclear power plants. SMRs may benefit from flexibility of investment, reduced upfront expenditure, and easy integration with small sized grids. Large reactors on the other hand have been an attractive option due to economy of scale. In this paper we focus on the advantages of flexibility due to modular construction of SMRs. Using real option analysis (ROA) we help a utility determine the value of sequential modular SMRs. Numerical results under different considerations, like possibility of rare events, learning, uncertain lifetimes are reported for a single large unit and modular SMRs

  17. Construction strategies and lifetime uncertainties for nuclear projects: A real option analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jain, Shashi, E-mail: s.jain@cwi.nl [TU Delft, Delft Institute of Applied Mathematics, Delft (Netherlands); Nuclear Research Group, Petten (Netherlands); Roelofs, Ferry, E-mail: roelofs@nrg.eu [Nuclear Research Group, Petten (Netherlands); Oosterlee, Cornelis W., E-mail: c.w.oosterlee@cwi.nl [CWI – Centrum Wiskunde and Informatica, Amsterdam (Netherlands); TU Delft, Delft Institute of Applied Mathematics, Delft (Netherlands)

    2013-12-15

    Highlights: • Real options can be used to value flexibility of modular reactors. • Value of NPPs increases with implementation of long term cost reductions. • Levels of uncertainties affect the choice between projects. -- Abstract: Small and medium sized reactors, SMRs (according to IAEA, ‘small’ are reactors with power less than 300 MWe, and ‘medium’ with power less than 700 MWe) are considered as an attractive option for investment in nuclear power plants. SMRs may benefit from flexibility of investment, reduced upfront expenditure, and easy integration with small sized grids. Large reactors on the other hand have been an attractive option due to economy of scale. In this paper we focus on the advantages of flexibility due to modular construction of SMRs. Using real option analysis (ROA) we help a utility determine the value of sequential modular SMRs. Numerical results under different considerations, like possibility of rare events, learning, uncertain lifetimes are reported for a single large unit and modular SMRs.

  18. ON-BOARD MONITORING OF TECHNICAL STATE FOR POWER UNITS OF WHEELED AND TRACKED VEHICLES

    Directory of Open Access Journals (Sweden)

    Yu. D. Karpievich

    2016-01-01

    Full Text Available The paper considers new methodologies pertaining to on-board diagnosis of wear-out rate for friction linings of a clutch driven disk and friction discs of a hydraulic press clutch of transmission gear boxes which are based on physical process that uses friction work as an integrated indicator. A new methodology in determination of life-span rate for engine oil has been developed in the paper. The paper presents block schematic diagrams for on-board monitoring of technical state for power units of wheeled and tracked vehicles. Usage of friction work as an integrated indicator for determination of wear-out rate for friction linings of clutch driven disk and friction discs of a haydraulic press clutch makes it possible timely at any operational period of wheeled and tracked vehicles to determine their residual operation life and forecast their replacement.While taking volume of the used fuel for determination of engine oil life-span rate it permits quickly and effectively at any operational period of wheeled and tracked vehicles to determine residual useful life of the engine oil and also forecast its replacement.

  19. QUALITY EVALUATION OF THE TPP POWER GENERATING UNITS WEAR RECONDITIONING

    Directory of Open Access Journals (Sweden)

    E. M. Farhadzadeh

    2016-01-01

    Full Text Available Reconditioning of the power generating unit worn equipment and devices is conducted during the scheduled repair period. Quality of wear reconditioning is evaluated by technical state and repair work implementation. Quality of the repair work execution characterizes logistical activities of the power station and the repair services and is rated by a five-grade scale. There are three technical conditions: adequate, subject to reservations, falling short of the technical standard documentation requirements. In practical work these constraints give place to essential ambiguity of the decision. Further to regulating techniques by way of informational support, the authors propose conducting the wear-reconditioning quality evaluation (repair quality accordingly the technical-and-economic indexes pattern of change. The paper recommends applying similarly the fivegrade system in evaluating the power generating unit technical state and distinguishes intolerable, dissatisfactory, fair, good and model estimates. The study demonstrates the assessment criteria dependence on the character of reliability and economical efficiency of performance variation after the repair with increase or decrease of the technical-and-economic indexes in reference to their mean, minimum and maximum values before the repair. The cases ascribed to intolerable quality of the wear reconditioning are those with one or more technical-and-economic indexes that not only failed to improve their values but deteriorated, and at that they became the worst amongst observable values. The model quality estimate of the wear reconditioning is allotted under condition that the power unit technical-and-economic index valuations after the repair not merely improved but also exceeded the best among those under observation. The developed method and algorithm for quality evaluation of the scheduled repair implementation contribute to practical realization of the independent monitoring. This monitoring

  20. The Amnesiac Lookback Option: Selectively Monitored Lookback Options and Cryptocurrencies

    Directory of Open Access Journals (Sweden)

    Ho-Chun Herbert Chang

    2018-05-01

    Full Text Available This study proposes a strategy to make the lookback option cheaper and more practical, and suggests the use of its properties to reduce risk exposure in cryptocurrency markets through blockchain enforced smart contracts and correct for informational inefficiencies surrounding prices and volatility. This paper generalizes partial, discretely-monitored lookback options that dilute premiums by selecting a subset of specified periods to determine payoff, which we call amnesiac lookback options. Prior literature on discretely-monitored lookback options considers the number of periods and assumes equidistant lookback periods in pricing partial lookback options. This study by contrast considers random sampling of lookback periods and compares resulting payoff of the call, put and spread options under floating and fixed strikes. Amnesiac lookbacks are priced with Monte Carlo simulations of Gaussian random walks under equidistant and random periods. Results are compared to analytic and binomial pricing models for the same derivatives. Simulations show diminishing marginal increases to the fair price as the number of selected periods is increased. The returns correspond to a Hill curve whose parameters are set by interest rate and volatility. We demonstrate over-pricing under equidistant monitoring assumptions with error increasing as the lookback periods decrease. An example of a direct implication for event trading is when shock is forecasted but its timing uncertain, equidistant sampling produces a lower error on the true maximum than random choice. We conclude that the instrument provides an ideal space for investors to balance their risk, and as a prime candidate to hedge extreme volatility. We discuss the application of the amnesiac lookback option and path-dependent options to cryptocurrencies and blockchain commodities in the context of smart contracts.

  1. Basket Option Pricing Using GP-GPU Hardware Acceleration

    KAUST Repository

    Douglas, Craig C.

    2010-08-01

    We introduce a basket option pricing problem arisen in financial mathematics. We discretized the problem based on the alternating direction implicit (ADI) method and parallel cyclic reduction is applied to solve the set of tridiagonal matrices generated by the ADI method. To reduce the computational time of the problem, a general purpose graphics processing units (GP-GPU) environment is considered. Numerical results confirm the convergence and efficiency of the proposed method. © 2010 IEEE.

  2. Potential and cost of clean development mechanism options in the energy sector. Inventory of options in non-Annex I countries to reduce GHG-emissions

    Energy Technology Data Exchange (ETDEWEB)

    Jansen, J.C.; Van der Linden, N.H.; Martens, J.W.; Ormel, F.; Van Rooijen, S.N.M. [ECN Policy Studies, Petten (Netherlands); Heaps, C.; Kartha, S.; Lazarus, M.; Ruth, M. [Stockholm Environment Institute SEI, Boston (United States); Lee, R.; Mendis, M. [Alternative Energy Development, Inc., Silver Spring (United States)

    1999-12-01

    An assessment is presented of the potential and cost of the Clean Development Mechanism as an instrument to partially meet the Greenhouse Gases emission limitation commitments of the Netherlands for the first budget period, 2008-2012. Information about the cost and emission reduction potential in the energy sector has been collected from national mitigation studies. In total, some 300 GHG emission reduction options in 24 non-Annex I countries have been collected Together, these countries account for two-thirds of current non-Annex I GHG emissions. The mitigation potential in non-Annex I countries is significant when compared with Annex I reduction requirements. The inventory of mitigation options suggests that an annual mitigation potential in the first budget period at costs up to 1990 USD 10/ton CO2 is approximately 1.7 Gt CO2 equivalents. However, this estimate should be viewed with caution, as the mitigation studies on which this estimate is based have been carried out as capacity-building exercises and they should not be viewed as definitive, technically rigorous, exhaustive, analysis of national GHG mitigation potential. 15 refs.

  3. Alternative disposal options for alpha-mixed low-level waste

    International Nuclear Information System (INIS)

    Loomis, G.G.; Sherick, M.J.

    1995-01-01

    This paper presents several disposal options for the Department of Energy alpha-mixed low-level waste. The mixed nature of the waste favors thermally treating the waste to either an iron-enriched basalt or glass waste form, at which point a multitude of reasonable disposal options, including in-state disposal, are a possibility. Most notably, these waste forms will meet the land-ban restrictions. However, the thermal treatment of this waste involves considerable waste handling and complicated/expensive offgas systems with secondary waste management problems. In the United States, public perception of offgas systems in the radioactive incinerator area is unfavorable. The alternatives presented here are nonthermal in nature and involve homogenizing the waste with cryogenic techniques followed by complete encapsulation with a variety of chemical/grouting agents into retrievable waste forms. Once encapsulated, the waste forms are suitable for transport out of the state or for actual in-state disposal. This paper investigates variances that would have to be obtained and contrasts the alternative encapsulation idea with the thermal treatment option

  4. Alternative disposal options for alpha-mixed low-level waste

    Energy Technology Data Exchange (ETDEWEB)

    Loomis, G.G.; Sherick, M.J. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1995-12-31

    This paper presents several disposal options for the Department of Energy alpha-mixed low-level waste. The mixed nature of the waste favors thermally treating the waste to either an iron-enriched basalt or glass waste form, at which point a multitude of reasonable disposal options, including in-state disposal, are a possibility. Most notably, these waste forms will meet the land-ban restrictions. However, the thermal treatment of this waste involves considerable waste handling and complicated/expensive offgas, systems with secondary waste management problems. In the United States, public perception of off gas systems in the radioactive incinerator area is unfavorable. The alternatives presented here are nonthermal in nature and involve homogenizing the waste with cryogenic techniques followed by complete encapsulation with a variety of chemical/grouting agents into retrievable waste forms. Once encapsulated, the waste forms are suitable for transport out of the state or for actual in-state disposal. This paper investigates variances that would have to be obtained and contrasts the alternative encapsulation idea with the thermal treatment option.

  5. Genome privacy: challenges, technical approaches to mitigate risk, and ethical considerations in the United States

    Science.gov (United States)

    Wang, Shuang; Jiang, Xiaoqian; Singh, Siddharth; Marmor, Rebecca; Bonomi, Luca; Fox, Dov; Dow, Michelle; Ohno-Machado, Lucila

    2016-01-01

    Accessing and integrating human genomic data with phenotypes is important for biomedical research. Making genomic data accessible for research purposes, however, must be handled carefully to avoid leakage of sensitive individual information to unauthorized parties and improper use of data. In this article, we focus on data sharing within the scope of data accessibility for research. Current common practices to gain biomedical data access are strictly rule based, without a clear and quantitative measurement of the risk of privacy breaches. In addition, several types of studies require privacy-preserving linkage of genotype and phenotype information across different locations (e.g., genotypes stored in a sequencing facility and phenotypes stored in an electronic health record) to accelerate discoveries. The computer science community has developed a spectrum of techniques for data privacy and confidentiality protection, many of which have yet to be tested on real-world problems. In this article, we discuss clinical, technical, and ethical aspects of genome data privacy and confidentiality in the United States, as well as potential solutions for privacy-preserving genotype–phenotype linkage in biomedical research. PMID:27681358

  6. Declassification, an actual operating materials management option in Cofrentes

    International Nuclear Information System (INIS)

    Garcia-Bermejo, R.; Diego compadre, J. L. de; Lopez Alvarez, L.; Analya Lazaro, M.

    2014-01-01

    Methods and procedures developed for declassification feature a series of methodological options and innovative technology, including the systematic use of the spatial random variable named index of Residual activity, level specific factors for declassification determined empirically for each unit of characterization and contrasts of hypothesis not parametric which are used in the demonstration of compliance of the levels of declassification Decision rules authorized by the CSN. (Author)

  7. Career and Technical Education at a Crossroads: A Delphi Study

    Science.gov (United States)

    Cutright, Michael W.

    2011-01-01

    Career and technical education in the United States has reached a critical juncture. A three round Delphi method was used to determine a consensus on the future events of career and technical education to better inform educational decision makers. Forty-one individual experts in the field were invited to serve as panelists for the Delphi study and…

  8. Patient knowledge on stroke risk factors, symptoms and treatment options.

    Science.gov (United States)

    Faiz, Kashif Waqar; Sundseth, Antje; Thommessen, Bente; Rønning, Ole Morten

    2018-01-01

    Public campaigns focus primarily on stroke symptom and risk factor knowledge, but patients who correctly recognize stroke symptoms do not necessarily know the reason for urgent hospitalization. The aim of this study was to explore knowledge on stroke risk factors, symptoms and treatment options among acute stroke and transient ischemic attack patients. This prospective study included patients admitted to the stroke unit at the Department of Neurology, Akershus University Hospital, Norway. Patients with previous cerebrovascular disease, patients receiving thrombolytic treatment and patients who were not able to answer the questions in the questionnaire were excluded. Patients were asked two closed-ended questions: "Do you believe that stroke is a serious disorder?" and "Do you believe that time is of importance for stroke treatment?". In addition, patients were asked three open-ended questions where they were asked to list as many stroke risk factors, stroke symptoms and stroke treatment options as they could. A total of 173 patients were included, of whom 158 (91.3%) confirmed that they regarded stroke as a serious disorder and 148 patients (85.5%) considered time being of importance. In all, 102 patients (59.0%) could not name any treatment option. Forty-one patients (23.7%) named one or more adequate treatment options, and they were younger ( p options, which may contribute to reduce prehospital delay and onset-to-treatment-time.

  9. Plasma exchange in the intensive care unit: Technical aspects and complications.

    Science.gov (United States)

    Lemaire, Aurélie; Parquet, Nathalie; Galicier, Lionel; Boutboul, David; Bertinchamp, Rémi; Malphettes, Marion; Dumas, Guillaume; Mariotte, Eric; Peraldi, Marie-Noëlle; Souppart, Virginie; Schlemmer, Benoit; Azoulay, Elie; Canet, Emmanuel

    2017-12-01

    Data on plasma exchange therapy in the intensive care unit (ICU) setting are scarce. We aimed to describe the technical aspects and the adverse events associated with the procedure in critically ill patients. All adult patients treated by plasma exchange in the medical ICU of the Saint-Louis university hospital between January 1, 2013 and March 31, 2015 were prospectively included. We report on 260 plasma exchange procedures performed in 50 patients. The centrifugation technique was used for 159 (61%) procedures and the filtration technique for the other 101 (39%) procedures. Both techniques had similar efficacy to treat hyperviscosity syndrome (n = 18). Seventy (26.9%) of the 260 plasma exchange procedures were reported with at least one adverse reaction. Centrifugation and filtration techniques had similar rates of adverse reactions (23.9 vs. 31.7%, P = .19). Hypotension was the most reported (n = 21, 8%) and correlates with a low hematocrit before therapy. Most complications were related to allergic reactions to the replacement fluids. Coagulation disorders depended on the type of replacement fluid. The post-exchange fibrinogen level was decreased by 54% [48;66] with albumin 5%, and 4% [-5;17] with plasma frozen within 24 h. Twenty-three (22.8%) of the 101 filtration procedures experienced filter clotting. Filter clotting was associated with a higher volume exchange prescribed when compared to procedures without filter clotting (4600 [4000;5000] ml vs. 3900 [3600;4800] ml, P < .01). Plasma exchange is a relatively safe and generally well-tolerated procedure in the ICU setting. Most adverse events are unpredictable and related to minor allergic reactions. © 2017 Wiley Periodicals, Inc.

  10. Biomethane in the transport sector-An appraisal of the forgotten option

    International Nuclear Information System (INIS)

    Ahman, Max

    2010-01-01

    The last 20 years efforts to find a long-term and large-scale biofuel alternative to petrol and diesel for the transport sector have been intensified with a focus on liquid biofuels, such as ethanol, methanol and Fischer-Tropsh diesel derived from wood. The large-scale production of biomethane has so far largely been overlooked in comparative studies that focus on the long-term renewable options. The aim of this article fills this gap and to provide a broad and systematic assessment of the future potential of biomethane compared to other biofuels. In order to become a large-scale option, biomethane production from woody biomass via gasification needs to be developed and commercialized. However, biomethane exhibits a clear development path with relatively low financial and technical risks starting with local solutions utilizing wet biomass resources towards medium and eventually large-scale gasification with economics similar to liquid second generation biofuels. The disadvantage of being a gaseous fuel is not insurmountable and can furthermore be relaxed by the integration and dual-use of the existing distribution system for natural gas. This assessment concludes that more emphasize should be given to biomethane as a large-scale option given the opportunity to use woody biomass from gasification.

  11. Hydrogen storage for wind parks: A real options evaluation for an optimal investment in more flexibility

    International Nuclear Information System (INIS)

    Kroniger, Daniel; Madlener, Reinhard

    2014-01-01

    Highlights: • Economic analysis of investing in H 2 storage for excess wind power production. • Use of real options analysis to account for uncertainty and managerial flexibility. • Hourly profits are simulated for profit-maximizing operation of the storage device. • Revenues by load factor increase, offering minute reserve, temporal arbitrage, H 2 sale. • Power-to-power is unprofitable under current techno-political conditions in Germany. - Abstract: In this paper, we investigate the economic viability of hydrogen storage for excess electricity produced in wind power plants. For the analysis, we define two scenarios (50 MW system with and without re-electrification unit) and apply Monte Carlo simulation and real options analysis (ROA) to compute hourly profits under uncertainty regarding wind speed, spot market electricity prices, and call of minute reserve capacity. Hydrogen as a storage medium helps to either (1) increase capacity utilization of the wind park in case of grid disconnection; (2) to offer minute reserve; or (3) to exploit temporal price arbitrage at the electricity spot market; additionally, hydrogen can also be directly sold as a commodity. We find that power-to-power operation is highly uneconomical under current framework conditions in Germany, irrespective of potential energy efficiency gains. Interestingly, due to counterbalancing effects, offshore wind parks are found to have only a modest economic advantage compared to onshore ones. The power-to-fuel plant can be operated profitably (at hydrogen prices of more than 0.36 € m −3 and a 100% utilization of the electrolyzer) if hydrogen is directly marketed instead of used to store and re-generate electrical energy. The ROA recommends investment in a storage device without re-electrification unit beyond an expected project value that is about twice the investment cost of the storage device, a figure which is reduced markedly as conversion efficiency rises, assuming technical change

  12. Technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1981-07-01

    This report documents the technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1. The tests were to verify that faults on the non-Class 1E circuits would not propagate to the Class 1E circuits and degrade them below acceptable levels. The tests conducted demonstrated that the safety features actuation system did not degrade below acceptable levels nor was the system's ability to perform its protective functions affected

  13. Modelling the International Climate Change Negotiations: A Non-Technical Outline of Model Architecture

    Energy Technology Data Exchange (ETDEWEB)

    Underdal, Arild

    1997-12-31

    This report discusses in non-technical terms the overall architecture of a model that will be designed to enable the user to (1) explore systematically the political feasibility of alternative policy options and (2) to determine the set of politically feasible solutions in the global climate change negotiations. 25 refs., 2 figs., 1 tab.

  14. Technical Evaluation Report 14: Chat and Instant Messaging Systems (synchronous: Report 2/ 3

    Directory of Open Access Journals (Sweden)

    Ellen Kinsel

    2002-10-01

    Full Text Available This study extends the earlier review of online chat systems (Report 6, by reviewing a further seven products that provide text-based instant messaging (IM. The functionality of these products in distance education contexts is stressed in relation to their comparative costs, complexity, control, clarity, technical framework, and other functional options.

  15. Magnetic fusion program in the United States: an overview and perspective

    International Nuclear Information System (INIS)

    Clarke, J.F.

    1978-01-01

    Continuing technical progress in magnetic fusion energy research and a coherent national program involving national laboratories, industry and universities has won strong support from the new Department of Energy. This review presents recent technical progress and examines fusion in relation to other long term energy supply options. Fusion is seen as a technology which, because of its apparently minimal environmental impacts and promise of reasonable cost, has a good chance of competing successfully with the other inexhaustible energy sources

  16. National Energy Strategy: Technical annex 7

    International Nuclear Information System (INIS)

    1992-01-01

    This paper provides analyses of nuclear energy options and the role of nuclear power as a future energy source for the United States. The Current Policy Base case reflects an energy future with no new nuclear policy initiatives and the gradual phaseout of nuclear power. This paper compares such a phaseout to the expanded use of nuclear power and identifies the consequences

  17. Technical Specifications, South Texas Project, Unit Nos. 1 and 2 (Docket Nos. 50-498 and 50-499): Appendix ''A'' to License Nos. NPF-76 and NPF-80

    International Nuclear Information System (INIS)

    1989-03-01

    The South Texas Project, Unit Nos. 1 and 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  18. Technical specifications, South Texas Project, Unit Nos. 1 and 2 (Docket Nos. 50-498 and 50-499): Appendix ''A'' to License Nos. NPF-76 and NPF-78

    International Nuclear Information System (INIS)

    1989-01-01

    The South Texas Project, Unit Nos. 1 and 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  19. Potential options to reduce GHG emissions in Venezuela

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, N.; Bonduki, Y.; Perdomo, M.

    1996-12-31

    The Government of Venezuela ratified the United Nations Framework Convention on Climate Change (UNFCCC) in December, 1994. The Convention requires all parties to develop and publish national inventories of anthropogenic greenhouse gas emissions (GHG) as well as national plans to reduce or control emissions, taking into account their common but differentiated responsibilities and their specific national and regional development priorities, objectives, and circumstances. Within this context, the Ministry of Environment and Renewable Natural Resources and the Ministry of Energy and Mines developed the `Venezuelan Case-Study to Address Climate Change`. The study was initiated in October 1993, with the financial and technical assistance of the Government of United States, through the U.S. Country Studies Program (USCSP), and the Global Environment Facility (GEF), through the United Nations Environment Programme (UNEP).

  20. The option to expand a project: its assessment with the binomial options pricing model

    Directory of Open Access Journals (Sweden)

    Salvador Cruz Rambaud

    Full Text Available Traditional methods of investment appraisal, like the Net Present Value, are not able to include the value of the operational flexibility of the project. In this paper, real options, and more specifically the option to expand, are assumed to be included in the project information in addition to the expected cash flows. Thus, to calculate the total value of the project, we are going to apply the methodology of the Net Present Value to the different scenarios derived from the existence of the real option to expand. Taking into account the analogy between real and financial options, the value of including an option to expand is explored by using the binomial options pricing model. In this way, estimating the value of the option to expand is a tool which facilitates the control of the uncertainty element implicit in the project. Keywords: Real options, Option to expand, Binomial options pricing model, Investment project appraisal

  1. The role of nuclear power in the option zero emission technologies for fossil fuels

    International Nuclear Information System (INIS)

    Corak, Z.

    2006-01-01

    The energy sector is one of the main sources of greenhouse gas (GHG) emissions particularly carbon dioxide (CO2) increasing concerns due to their potential risk to induce global warming and climate change. The Parties having signed the Kyoto Protocol in December 1997, committed to decrease their GHG emissions. The Protocol states that countries shall undertake promotion, research, development and increased use of new and renewable forms of energy, of carbon dioxide sequestration technologies and of advanced and innovative environmentally sound technologies. The one significant option that is not specifically mentioned is nuclear energy which is essentially carbon-free. There are a number of technical options that could help reducing, or at least slowing the increase of, GHG emissions from the energy sector. The list of options includes: improving the efficiency of energy conversion and end-use processes; shifting to less carbon intensive energy sources (e.g. shifting from coal to natural gas); developing carbon-free or low-carbon energy sources; and carbon sequestration (e.g. planting forests or capturing and storing carbon dioxide). It must be pointed out that nuclear power is one of the few options that are currently available on the market, competitive in a number of countries, especially if global costs to society of alternative options are considered; practically carbon-free; and sustainable at large-scale deployment. The nuclear power could play significant role in alleviating the risk of global climate change. The main objective of the article is to present sequestration options, their cost evaluation as well as comparation with alternative possibilities of nuclear energy production. (author)

  2. Technical description of the burn-up software system MOP

    International Nuclear Information System (INIS)

    Schutte, C.K.

    1991-05-01

    The burn-up software system MOP is a research tool primary intended to study the behaviour of fission products in any reactor composition. Input data are multi-group cross-sections and data concerning the nuclide chains. An option is available to calculate a fundamental mode neutron spectrum for the specified reactor composition. A separate program can test the consistency of the specified nuclide chains. Options are available to calculate time-dependent cross-sections of lumped fission products and to take account of the leakage of gaseous fission products from the reactor core. The system is written in FORTRAN77 for a CYBER computer, using the operating system NOS/BE. The report gives a detailed technical description of the applied algorithms and the flow and storage of data. Information is provided for adapting the system to other computer configurations. (author). 5 refs.; 11 figs

  3. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  4. Traffic Light Options

    DEFF Research Database (Denmark)

    Jørgensen, Peter Løchte

    This paper introduces, prices, and analyzes traffic light options. The traffic light option is an innovative structured OTC derivative developed independently by several London-based investment banks to suit the needs of Danish life and pension (L&P) companies, which must comply with the traffic...... 2006, and supervisory authorities in many other European countries have implemented similar regulation. Traffic light options are therefore likely to attract the attention of a wider audience of pension fund managers in the future. Focusing on the valuation of the traffic light option we set up a Black...... light scenarios. These stress scenarios entail drops in interest rates as well as in stock prices, and traffic light options are thus designed to pay off and preserve sufficient capital when interest rates and stock prices fall simultaneously. Sweden's FSA implemented a traffic light system in January...

  5. Traffic Light Options

    DEFF Research Database (Denmark)

    Jørgensen, Peter Løchte

    2007-01-01

    This paper introduces, prices, and analyzes traffic light options. The traffic light option is an innovative structured OTC derivative developed independently by several London-based investment banks to suit the needs of Danish life and pension (L&P) companies, which must comply with the traffic...... 2006, and supervisory authorities in many other European countries have implemented similar regulation. Traffic light options are therefore likely to attract the attention of a wider audience of pension fund managers in the future. Focusing on the valuation of the traffic light option we set up a Black...... light scenarios. These stress scenarios entail drops in interest rates as well as in stock prices, and traffic light options are thus designed to pay off and preserve sufficient capital when interest rates and stock prices fall simultaneously. Sweden's FSA implemented a traffic light system in January...

  6. The origins of options.

    Science.gov (United States)

    Smaldino, Paul E; Richerson, Peter J

    2012-01-01

    Most research on decision making has focused on how human or animal decision makers choose between two or more options, posed in advance by the researchers. The mechanisms by which options are generated for most decisions, however, are not well understood. Models of sequential search have examined the trade-off between continued exploration and choosing one's current best option, but still cannot explain the processes by which new options are generated. We argue that understanding the origins of options is a crucial but untapped area for decision making research. We explore a number of factors which influence the generation of options, which fall broadly into two categories: psycho-biological and socio-cultural. The former category includes factors such as perceptual biases and associative memory networks. The latter category relies on the incredible human capacity for culture and social learning, which doubtless shape not only our choices but the options available for choice. Our intention is to start a discussion that brings us closer toward understanding the origins of options.

  7. 30 CFR 90.3 - Part 90 option; notice of eligibility; exercise of option.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Part 90 option; notice of eligibility; exercise of option. 90.3 Section 90.3 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... DEVELOPMENT OF PNEUMOCONIOSIS General § 90.3 Part 90 option; notice of eligibility; exercise of option. (a...

  8. Underground cables as an alternative to overhead lines. A comparison of economic and technical aspects of voltages over 22 kV

    Energy Technology Data Exchange (ETDEWEB)

    Trohjell, J.E.; Vognild, I.H.

    1994-07-11

    The report presents technical and economical aspects of underground cables compared to overhead lines in Norway in high voltage transmission systems above 22 kV. The economical comparison between the two options includes capital costs of installation (investment costs), maintenance costs and costs of electrical losses. The main technical issues discussed are reliability and flexibility. 35 refs., 23 figs., 29 tabs.

  9. Standard technical specifications for General Electric boiling water reactors

    International Nuclear Information System (INIS)

    1979-08-01

    This Standard Technical Specification (STS) has been structured for the broadest possible use on General Electric plants currently being reviewed for an Operating License. Optional specifications are provided for those features and systems which may be included in individual plant designs but are not generic in their scope of application. This revision of the GE-STS does not typically include requirements which may be added or revised as a result of the NRC staff's further review of the Three Mile Island incident

  10. CANDU fuel cycle options in Korea

    International Nuclear Information System (INIS)

    Boczar, P. G.; Fehrenbach, P. J.; Meneley, D. A.

    1996-01-01

    There are many reasons for countries embarking on a CANDU R program to start with the natural uranium fuel cycle. Simplicity of fuel design, ease of fabrication, and ready availability of natural uranium all help to localize the technology and to reduce reliance on foreign technology. Nonetheless, at some point, the incentives for using natural uranium fuel may be outweighed by the advantages of alternate fuel cycles. The excellent neutron economy, on-line refuelling, and simple fuel-bundle design provide an unsurpassed degree of fuel-cycle flexibility in CANDU reactors. The easiest first step in CANDU fuel-cycle evolution may be the use of slightly enriched uranium (SEU), including recovered uranium from reprocessed LWR spent fuel. Relatively low enrichment (up to 1.2%) will result in a two- to three-fold reduction in the quantity of spent fuel per unit energy production, reductions in fuel-cycle costs, and greater flexibility in the design of new reactors. The CANFLEX (CANDU FLEXible) fuel bundle would be the optimal fuel carrier. A country that has both CANDU and PWR reactors can exploit the natural synergism between these two reactor types to minimize overall waste production, and maximize energy derived from the fuel. This synergism can be exploited through several different fuel cycles. A high burnup CANDU MOX fuel design could be used to utilize plutonium from conventional reprocessing or more advanced reprocessing options (such as co-processing). DUPIC (Direct Use of Spent PWR Fuel In CANDU) represents a recycle option that has a higher degree of proliferation resistance than dose conventional reprocessing, since it uses only dry processes for converting spent PWR fuel into CANDU fuel, without separating the plutonium. Good progress is being made in the current KAERI, AECL, and U. S. Department of State program in demonstrating the technical feasibility of DUPIC. In the longer term, CANDU reactors offer even more dramatic synergistic fuel cycles with PWR or

  11. Advanced Demonstration and Test Reactor Options Study

    Energy Technology Data Exchange (ETDEWEB)

    Petti, David Andrew [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hill, R. [Argonne National Lab. (ANL), Argonne, IL (United States); Gehin, J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gougar, Hans David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Strydom, Gerhard [Idaho National Lab. (INL), Idaho Falls, ID (United States); Heidet, F. [Argonne National Lab. (ANL), Argonne, IL (United States); Kinsey, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States); Qualls, A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Brown, Nicholas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Powers, J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hoffman, E. [Argonne National Lab. (ANL), Argonne, IL (United States); Croson, D. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-01-01

    Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy

  12. Advanced Demonstration and Test Reactor Options Study

    International Nuclear Information System (INIS)

    Petti, David Andrew; Hill, R.; Gehin, J.; Gougar, Hans David; Strydom, Gerhard; Heidet, F.; Kinsey, J.; Grandy, Christopher; Qualls, A.; Brown, Nicholas; Powers, J.; Hoffman, E.; Croson, D.

    2017-01-01

    Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power's share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy's (DOE's) broader commitment to pursuing an 'all of the above' clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate 'advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy'. Advanced reactors are

  13. Technical energy savings versus changes in human behaviour

    DEFF Research Database (Denmark)

    Nørgaard, Jørgen

    1996-01-01

    Energy savings seems to be the most environmentally benign element in an energy policy. The paper is a reflection on the work on saving energy both by improving technology and by adapting human daily behaviour. A simple model is suggested for the energy chain which converts the primary energy all...... the way into human satisfaction via energy services. Results of various analyses and field experiments show saving potentials for electricity of 50 - 80 per cents. Barriers for implementing these technical saving options are discussed. Also the necessity and potentials for changing behavioural or life...

  14. Mitigation options for the industrial sector in Egypt

    Energy Technology Data Exchange (ETDEWEB)

    Gelil, I.A.; El-Touny, S.; Korkor, H. [Organization for Energy Conservation and Planning (OECP), Cairo (Egypt)

    1996-12-31

    Though its contribution to the global Greenhouse gases emission is relatively small, Egypt has signed and ratified the United Nations Framework Convention on Climate Change (UN FCCC) and has been playing an active role in the international efforts to deal with such environmental challenges. Energy efficiency has been one of the main strategies that Egypt has adopted to improve environmental quality and enhance economic competitiveness. This paper highlights three initiatives currently underway to improve energy efficiency of the Egyptian industry. The first is a project that has been recently completed by OECP to assess potential GHG mitigation options available in Egypt`s oil refineries. The second initiative is an assessment of GHG mitigation potential in the Small and Medium size Enterprises (SME) in the Mediterranean city of Alexandria. The third one focuses on identifying demand side management options in some industrial electricity consumers in the same city.

  15. Unit: Electric Circuits, Inspection Pack, National Trial Print.

    Science.gov (United States)

    Australian Science Education Project, Toorak, Victoria.

    As a part of the unit materials in the series produced by the Australian Science Education Project, this teacher edition is primarily composed of a core relating to simple circuits, a test form, and options. Options are given under the headings: Your Invention; "How Long Does a Call Last?"; One, Two, Three Wires; Parallel Circuits; More…

  16. Technical nuclear safety in France. Control by the governmental authority

    International Nuclear Information System (INIS)

    1991-12-01

    In publishing this latest edition, we have endeavoured to provide the reader with the information necessary to obtain a full understanding of the regulatory system applied to ensure technical nuclear safety in France. As the reader will discover in the following pages, technical nuclear safety is a matter which must be settled in advance of the actual operation of civil nuclear installations; the primary requirement is to mobilize those involved to anticipate and prevent. The fundamental options on which the French system is based, the relationship between the operator and the safety authority must be clearly stated: independence of judgement and decision, complementarity of responsibilities. It is for the governmental authorities to determine the technical nuclear safety objectives, which are becoming more and more consistent if not unified throughout the world. It is for the operator to propose technical provisions in order to achieve these objectives. It is for the governmental authorities to verify, by technical safety analyses, the adequacy of the provisions in terms of the defined objectives. It is for the operator to properly implement these approved provisions. And, finally, it is for the governmental authorities to verify, by sampling, the quality of their implementation and to make from them the necessary regulatory inferences. This sequence of events requires permanent frank in-depth dialogue. The effectiveness of the regulatory action must therefore reside not in close technical restraint but in the interactions between responsible partners

  17. Technical nuclear safety in France. Control by the governmental authority

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-15

    In publishing this latest edition, we have endeavoured to provide the reader with the information necessary to obtain a full understanding of the regulatory system applied to ensure technical nuclear safety in France. As the reader will discover in the following pages, technical nuclear safety is a matter which must be settled in advance of the actual operation of civil nuclear installations; the primary requirement is to mobilize those involved to anticipate and prevent. The fundamental options on which the French system is based, the relationship between the operator and the safety authority must be clearly stated: independence of judgement and decision, complementarity of responsibilities. It is for the governmental authorities to determine the technical nuclear safety objectives, which are becoming more and more consistent if not unified throughout the world. It is for the operator to propose technical provisions in order to achieve these objectives. It is for the governmental authorities to verify, by technical safety analyses, the adequacy of the provisions in terms of the defined objectives. It is for the operator to properly implement these approved provisions. And, finally, it is for the governmental authorities to verify, by sampling, the quality of their implementation and to make from them the necessary regulatory inferences. This sequence of events requires permanent frank in-depth dialogue. The effectiveness of the regulatory action must therefore reside not in close technical restraint but in the interactions between responsible partners.

  18. Options with Extreme Strikes

    Directory of Open Access Journals (Sweden)

    Lingjiong Zhu

    2015-07-01

    Full Text Available In this short paper, we study the asymptotics for the price of call options for very large strikes and put options for very small strikes. The stock price is assumed to follow the Black–Scholes models. We analyze European, Asian, American, Parisian and perpetual options and conclude that the tail asymptotics for these option types fall into four scenarios.

  19. Stricturoplasty-a bowel-sparing option for long segment small bowel Crohn's disease.

    Science.gov (United States)

    Limmer, Alexandra M; Koh, Hoey C; Gilmore, Andrew

    2017-08-01

    Stricturoplasty is a surgical option for management of severe stricturing Crohn's disease of the small bowel. It avoids the need for small bowel resection and the associated metabolic complications. This report contrasts the indications and technical aspects of two different stricturoplasty techniques. Case 1 describes an extensive Michelassi (side-to-side isoperistaltic) stricturoplasty performed for a 100 cm segment of diseased small bowel in a 45-year-old patient. Case 2 describes the performance of 12 Heineke-Mikulicz stricturoplasties in a 23-year-old patient with multiple short fibrotic strictures.

  20. Western United States Dams Challenges Faced, Options, and Opportunities

    Science.gov (United States)

    Raff, D.

    2017-12-01

    Water management in the Western United States relies significantly upon a fleet of small to very large engineered dams to store water during times of runoff and distribute that water during times of need. Much of this infrastructure is Federally owned and/or operated, and was designed and funded during the first half of the twentieth century through a complex set of repayment contracts for Federally authorized purposes addressing water supply, recreation, and hydropower, and other water management objectives. With environmental laws, namely the Endangered Species Act, and other environmental concerns taking a more active role in water resources in the mid to latter half of the twentieth century, this infrastructure is being stressed even greater than anticipated to provide authorized purposes. Additionally, weather and climate norms being experienced are certainly near the edges, if not outside, of anticipated variability in the climate and hydrology scenarios for which the infrastructure was designed. And, finally, these dams, economically designed for a lifespan of 50 - 100 years, are experiencing maintenance challenges from routine to significant. This presentation will focus on identifying some of the history and challenges facing the water infrastructure in the Western United States. Additionally, some perspectives on future paths to meet the needs of western irrigation and hydropower production will be provided.

  1. General equilibrium effects of a supply side GHG mitigation option under the Clean Development Mechanism.

    Science.gov (United States)

    Timilsina, Govinda R; Shrestha, Ram M

    2006-09-01

    The Clean Development Mechanism (CDM) under the Kyoto Protocol to the United Nations Framework Convention on Climate Change is considered a key instrument to encourage developing countries' participation in the mitigation of global climate change. Reduction of greenhouse gas (GHG) emissions through the energy supply and demand side activities are the main options to be implemented under the CDM. This paper analyses the general equilibrium effects of a supply side GHG mitigation option-the substitution of thermal power with hydropower--in Thailand under the CDM. A static multi-sector general equilibrium model has been developed for the purpose of this study. The key finding of the study is that the substitution of electricity generation from thermal power plants with that from hydropower plants would increase economic welfare in Thailand. The supply side option would, however, adversely affect the gross domestic product (GDP) and the trade balance. The percentage changes in economic welfare, GDP and trade balance increase with the level of substitution and the price of certified emission reduction (CER) units.

  2. Technical records as material evidence in criminal proceedings

    Directory of Open Access Journals (Sweden)

    Fitim Shishani

    2017-03-01

    Full Text Available Nowadays, with the aid of technical records - recordings (audio, visual or combined audiovisual events and occurrences can be registered in the outside world in detail. The recording enables the creator or anyone who has it in disposal that at any moment of its reproduction, it can be found in detail how the recorded event has happened or how an occurrence seemed at the time of the recording. Among the current formats of technical records are included: photography, filming, magnetic, magnetoscope, and videophone recording etc. (Sahiti & Murati 2016, 295. The possibility provided by the rapid technical development is also of interest to criminal procedure because technical records containing any fact that may be proved in criminal proceedings may serve as a source of knowledge about facts. In other words, they may serve as evidence to establish facts in criminal proceedings. Given the extensive options that technical fact recordings provide, entities that use the aid of various devices from this fi eld, as well as the different purposes of the author of the recording which have led to the case of making the recording, there is a reasonable question of the permission on their use as evidence in criminal proceedings. In Kosovo, the situation is clear in terms of recordings made in the criminal procedure, as Kosovo CCP 1 provides the possibility of photographing, filming, sketching, etc., of the crime scene, audio visual recording etc. examination of persons (defendant, witness, expert or recordings of any action on judicial review.

  3. Photovoltaic power - An important new energy option

    Science.gov (United States)

    Ferber, R. R.

    1983-01-01

    A review of photovoltaic (PV) power technology is presented with an emphasis of PV as an economical and technically feasible alternative source of energy. The successful completion of the development and transfer of emerging low-cost technologies into a fully commercialized status are identified as the means to the realization of this option's full potential. The DOE National Photovoltaics Program, a significant sponsor of PV R&D, expects both flat-plate and concentrator collectors to meet established cost targets. Citing the DOE large flat-plate grid-connected system project of the Sacramento Municipal Utility District, current technology modules priced at near $5/Wp (1983 dollars) are steadily reducing costs. A recent DOE study suggests that PV-generated electricity produced at a 30-year levelized cost of 15 cents per kWh would represent a viable energy supply alternative for the nation.

  4. Hydrogen production by supercritical water gasification of biomass. Phase 1 -- Technical and business feasibility study, technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The nine-month Phase 1 feasibility study was directed toward the application of supercritical water gasification (SCWG) for the economical production and end use of hydrogen from renewable energy sources such as sewage sludge, pulp waste, agricultural wastes, and ultimately the combustible portion of municipal solid waste. Unique in comparison to other gasifier systems, the properties of supercritical water (SCW) are ideal for processing biowastes with high moisture content or contain toxic or hazardous contaminants. During Phase I, an end-to-end SCWG system was evaluated. A range of process options was initially considered for each of the key subsystems. This was followed by tests of sewage sludge feed preparation, pumping and gasification in the SCW pilot plant facility. Based on the initial process review and successful pilot-scale testing, engineering evaluations were performed that defined a baseline system for the production, storage and end use of hydrogen. The results compare favorably with alternative biomass gasifiers currently being developed. The results were then discussed with regional wastewater treatment facility operators to gain their perspective on the proposed commercial SCWG systems and to help define the potential market. Finally, the technical and business plans were developed based on perceived market needs and the projected capital and operating costs of SCWG units. The result is a three-year plan for further development, culminating in a follow-on demonstration test of a 5 MT/day system at a local wastewater treatment plant.

  5. Process options for treatment of organic containing ILWs by wet oxidation

    International Nuclear Information System (INIS)

    Holman, D.J.

    1989-01-01

    The process chemistry, applications and experience with several wet oxidation options are reviewed along with criteria for the selection of viable systems and plant designs, covering a range of organic wastes, including solvents, cellulosic filters, chelant decontamination reagents and ion exchange resins. The use of hydrogen peroxide to treat water-cooled reactor residues containing mixed inorganic and organic filter materials with ion exchange resins is examined in further detail along with treatment of secondary arisings. The technical and financial justifications for treatment are examined along with the engineering requirements to retro-fit the required plant to an existing cement encapsulation facility. (author)

  6. Real options valuation of US federal renewable energy research, development, demonstration, and deployment

    International Nuclear Information System (INIS)

    Siddiqui, Afzal S.; Marnay, Chris; Wiser, Ryan H.

    2007-01-01

    Benefits analysis of US Federal government research, development, demonstration, and deployment (RD 3 ) programmes for renewable energy (RE) technology improvement typically employs a deterministic forecast of the cost and performance of renewable and non-renewable fuels. The benefits estimate for the programme derives from the difference between two forecasts, with and without the RD 3 programme in place. Three deficiencies of this approach are that it ignores: (1) uncertainty in the cost of non-renewable energy (NRE); (2) the possibility of adjustment to the RD 3 effort commensurate with the evolving state of the world; and (3) the underlying technical risk associated with RD 3 . In this paper, an intuitive approach to determining the option value of RE RD 3 is developed. This approach seeks to tackle the first two deficiencies noted above by providing an estimate via a compound real option of an RE RD 3 programme in a future with uncertain NRE costs. A binomial lattice reveals the economic intuition underlying the decision-making process, while a numerical example illustrates the option components embedded in a simplified representation of current US Federal RE RD 3

  7. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  8. Early site reviews for nuclear power facilities: procedures and possible technical review options. Draft

    International Nuclear Information System (INIS)

    1978-02-01

    The document provides guidance for utility companies, State and other governmental agencies, and others who may request or may wish to participate in an early review of site suitability issues related to a site proposed for a nuclear power or test reactor. Although the emphasis of this document is on a nuclear electric generating station, the guidance provided can be used for a test reactor or other kinds of reactors. The procedures to be followed by applicants for construction permits and by others are described and the possible significant areas of technical review are delineated

  9. Technical Specifications: Vogtle Electric Generating Plant, Unit Nos. 1 and 2 (Docket Nos. 50-424 and 50-425): Appendix ''A'' to License Nos. NPF-68 and NPF-79

    International Nuclear Information System (INIS)

    1989-02-01

    The Vogtle Electric Generating Plant, Unit Nos. 1 and 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear facility as set forth in Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public

  10. Technical Specifications, Vogtle Electric Generating Plant, Unit Nos. 1 and 2 (Docket Nos. 50-424 and 50-425): Appendix ''A'' to License Nos. NPF-68 and NPF-81

    International Nuclear Information System (INIS)

    1989-03-01

    The Vogtle Electric Generating Plant, Unit Nos. 1 and 2, Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear facility as set forth in Section 50.36 of 10 CFR 50 for the protection of the health and safety of the public

  11. Treatment Options for Retinoblastoma

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other places in the body. Treatment Option Overview Key Points There are different types of ...

  12. Goals, organisation and means of the French IPSN emergency technical center

    International Nuclear Information System (INIS)

    Chauliac, C.; Manesse, D.; Crabol, B.; Ney, J.

    1990-01-01

    In France, in case of an accident in a nuclear installation, a national emergency organization would be set up. It involves close collaboration between the safety authorities and the operating utility. The above arrangement consists mainly in a decision-making level (the Emergency Centre of the SCSIN) and a think tank (the Emergency Technical Centre of the IPSN). During the early phase of the accident (corresponding to the off-site emergency response plan, or PPI in french), the IPSN Emergency Technical Center (ETC) is organized round a management unit receiving analysis data from two working parties, one studying the situation within the damaged plant (plant assessment unit) and the other concerned with assessing the radiological consequences of the accident (radiological consequence unit). During the intermediate phase of the accident (corresponding to the off-site post-accident response plan, or PPA in french), the plant assessment unit is removed from the organization and the radiological consequence unit is transformed in a post-accident unit with the presence of new experts in the fields of agriculture, hydrology, hydrogeology,.... In both phases, an other unit of the ETC (the operational unit) is in charge of the co-ordination of the intervention means of the CEA which are, on request, placed at the public authorities disposal

  13. Risk-based decision-making framework for the selection of sediment dredging option.

    Science.gov (United States)

    Manap, Norpadzlihatun; Voulvoulis, Nikolaos

    2014-10-15

    The aim of this study was to develop a risk-based decision-making framework for the selection of sediment dredging option. Descriptions using case studies of the newly integrated, holistic and staged framework were followed. The first stage utilized the historical dredging monitoring data and the contamination level in media data into Ecological Risk Assessment phases, which have been altered for benefits in cost, time and simplicity. How Multi-Criteria Decision Analysis (MCDA) can be used to analyze and prioritize dredging areas based on environmental, socio-economic and managerial criteria was described for the next stage. The results from MCDA will be integrated into Ecological Risk Assessment to characterize the degree of contamination in the prioritized areas. The last stage was later described using these findings and analyzed using MCDA, in order to identify the best sediment dredging option, accounting for the economic, environmental and technical aspects of dredging, which is beneficial for dredging and sediment management industries. Copyright © 2014 Elsevier B.V. All rights reserved.

  14. Options for the management of Chernobyl-restricted areas in England and Wales

    International Nuclear Information System (INIS)

    Nisbet, A.; Woodman, R.

    1999-01-01

    Areas in England and Wales are still subject to restrictions on tile movement, sale and slaughter of sheep because concentrations of radiocaesium in sheep meat may exceed the 1000 Bq kg -1 limit imposed after the Chernobyl nuclear power plant accident. Various monitoring programmes have been implemented to enable lamb production to be sustained in these restricted areas, although no alternative management strategies have been considered to date. Current management practices have been reviewed and costed. An assessment has also been undertaken to establish the practicability and cost effectiveness of five alternative management options. The practicability of each option, which encompasses technical feasibility, capacity, cost, impact and acceptability, was assessed through a series of case studies carried out on farms in the restricted area of north Wales, and through consultation with a range of organisations with interests in farming and/or the environment. Recommendations are made for the future management of the restricted areas in England and Wales. (author)

  15. Polish Toxic Currency Options

    Directory of Open Access Journals (Sweden)

    Waldemar Gontarski

    2009-06-01

    Full Text Available Toxic currency options are defined on the basis of the opposition to the nature (essence of an option contract, which is justified in terms of norms founded on the general law clause of characteristics (nature of a relation (which represents an independent premise for imposing restrictions on the freedom of contracts. So-understood toxic currency options are unlawful. Indeed they contravene iuris cogentis regulations. These include for instance option contracts, which are concluded with a bank, if the bank has not informed about option risk before concluding the contract; or the barrier options, which focus only on the protection of bank’s interests. Therefore, such options may appear to be invalid. Therefore, performing contracts for toxic currency options may be qualified as a criminal mismanagement. For the sake of security, the manager should then take into consideration filing a claim for stating invalidity (which can be made in a court verdict. At the same time, if the supervisory board member in a commercial company, who can also be a subject to mismanagement offences, commits an omission involving lack of reaction (for example, if he/she fails to notify of the suspected offence committed by the management board members acting to the company’s detriment when the management board makes the company conclude option contracts which are charged with absolute invalidity the supervisory board member so acting may be considered to act to the company’s detriment. In the most recent Polish jurisprudence and judicature the standard of a “good host” is treated to be the last resort for determining whether the manager’s powers resulting from criminal regulations were performed. The manager of the exporter should not, as a rule, issue any options. Issuing options always means assuming an obligation. In the case of currency put options it is an absolute obligation to purchase a given amount in euro at exchange rate set in advance. On the

  16. Web-Conferencing: An Analysis of Course Delivery Systems on Student Achievement at a Technical College

    Science.gov (United States)

    Stanford, Roger John

    2012-01-01

    Web-conferencing software was chosen for course delivery to provide flexible options for students at a two-year technical college. Students used technology to access a live, synchronous microeconomics course over the internet instead of a traditional face-to-face lecture. This investigation studied the impact of implementing web-conferencing…

  17. Surgical options for lumbosacral fusion: biomechanical stability, advantage, disadvantage and affecting factors in selecting options.

    Science.gov (United States)

    Yoshihara, Hiroyuki

    2014-07-01

    Numerous surgical procedures and instrumentation techniques for lumbosacral fusion (LSF) have been developed. This is probably because of its high mechanical demand and unique anatomy. Surgical options include anterior column support (ACS) and posterior stabilization procedures. Biomechanical studies have been performed to verify the stability of those options. The options have their own advantage but also disadvantage aspects. This review article reports the surgical options for lumbosacral fusion, their biomechanical stability, advantages/disadvantages, and affecting factors in option selection. Review of literature. LSF has lots of options both for ACS and posterior stabilization procedures. Combination of posterior stabilization procedures is an option. Furthermore, combinations of ACS and posterior stabilization procedures are other options. It is difficult to make a recommendation or treatment algorithm of LSF from the current literature. However, it is important to know all aspects of the options and decision-making of surgical options for LSF needs to be tailored for each patient, considering factors such as biomechanical stress and osteoporosis.

  18. American Academy of Pediatrics: Technical report: Alternative dispute resolution in medical malpractice.

    Science.gov (United States)

    Fraser, J J

    2001-03-01

    The purpose of this technical report is to provide pediatricians with an understanding of past crises within the professional liability insurance industry, the difficulties of the tort system, and alternative strategies for resolving malpractice disputes that have been applied to medical malpractice actions. Through this report, pediatricians will gain a technical understanding of common alternative dispute resolution (ADR) strategies. The report explains the distinctions between various ADR methods in terms of process and outcome, risks and benefits, appropriateness to the nature of the dispute, and long-term ramifications. By knowing these concepts, pediatricians faced with malpractice claims will be better-equipped to participate in the decision-making with legal counsel on whether to settle, litigate, or explore ADR options.

  19. Strengthening government management capacity to scale up HIV prevention programs through the use of Technical Support Units: lessons from Karnataka state, India

    Science.gov (United States)

    Sgaier, Sema K; Anthony, John; Bhattacharjee, Parinita; Baer, James; Malve, Vidyacharan; Bhalla, Aparajita; Hugar, Vijaykumar S

    2014-01-01

    ABSTRACT Scaling up HIV prevention programming among key populations (female sex workers and men who have sex with men) has been a central strategy of the Government of India. However, state governments have lacked the technical and managerial capacity to oversee and scale up interventions or to absorb donor-funded programs. In response, the national government contracted Technical Support Units (TSUs), teams with expertise from the private and nongovernmental sectors, to collaborate with and assist state governments. In 2008, a TSU was established in Karnataka, one of 6 Indian states with the highest HIV prevalence in the country and where monitoring showed that its prevention programs were reaching only 5% of key populations. The TSU provided support to the state in 5 key areas: assisting in strategic planning, rolling out a comprehensive monitoring and evaluation system, providing supportive supervision to intervention units, facilitating training, and assisting with information, education, and communication activities. This collaborative management model helped to increase capacity of the state, enabling it to take over funding and oversight of HIV prevention programs previously funded through donors. With the combined efforts of the TSU and the state government, the number of intervention units statewide increased from 40 to 126 between 2009 and 2013. Monthly contacts with female sex workers increased from 5% in 2008 to 88% in 2012, and with men who have sex with men, from 36% in 2009 to 81% in 2012. There were also increases in the proportion of both populations who visited HIV testing and counseling centers (from 3% to 47% among female sex workers and from 6% to 33% among men who have sex with men) and sexually transmitted infection clinics (from 4% to 75% among female sex workers and from 7% to 67% among men who have sex with men). Changes in sexual behaviors among key populations were also documented. For example, between 2008 and 2010, the proportion of

  20. TANK SPACE OPTIONS REPORT

    International Nuclear Information System (INIS)

    Willis, W.L.; Ahrendt, M.R.

    2009-01-01

    Since this report was originally issued in 2001, several options proposed for increasing double-shell tank (DST) storage space were implemented or are in the process of implementation. Changes to the single-shell tank (SST) waste retrieval schedule, completion of DST space saving options, and the DST space saving options in progress have delayed the projected shortfall of DST storage space from the 2007-2011 to the 2018-2025 timeframe (ORP-11242, River Protection Project System Plan). This report reevaluates options from Rev. 0 and includes evaluations of new options for alleviating projected restrictions on SST waste retrieval beginning in 2018 because of the lack of DST storage space.

  1. Cycling of conventional power plants: Technical limits and actual costs

    International Nuclear Information System (INIS)

    Van den Bergh, Kenneth; Delarue, Erik

    2015-01-01

    Highlights: • Literature reports a wide range of cycling parameters (technical and cost-related). • The impact of different cycling parameters is assessed. • The German 2013 system is studied as a case study. • Even for stringent parameters, the dynamic limit of the portfolio is not reached. • Cycling costs can be reduced with 40% when taken into account in the scheduling. - Abstract: Cycling of conventional generation units is an important source of operational flexibility in the electricity generation system. Cycling is changing the power output of conventional units by means of ramping and switching (starting up and shutting down). In the literature, a wide range of technical and cost-related cycling parameters can be found. Different studies allocate different cycling parameters to similar generation units. This paper assesses the impact of different cycling parameters allocated to a conventional generation portfolio. Both the technical limitations of power plants and all costs related to cycling are considered. The results presented in this paper follow from a unit commitment model, used for a case study based on the German 2013 system. The conventional generation portfolio has to deliver different residual load time series, corresponding to different levels of renewables penetration. The study shows, under the assumptions made, that although the dynamic limits of some units are reached, the limits of the conventional generation portfolio as a whole are not reached, even if stringent dynamic parameters are assigned to the generation portfolio and a highly variable residual load is imposed to the system. The study shows also the importance of including full cycling costs in the unit commitment scheduling. The cycling cost can be reduced by up to 40% when fully taken into account

  2. Cooperative Monitoring Center Occasional Paper/8: Cooperative Border Security for Jordan: Assessment and Options

    Energy Technology Data Exchange (ETDEWEB)

    Qojas, M.

    1999-03-01

    This document is an analysis of options for unilateral and cooperative action to improve the security of Jordan's borders. Sections describe the current political, economic, and social interactions along Jordan's borders. Next, the document discusses border security strategy for cooperation among neighboring countries and the adoption of confidence-building measures. A practical cooperative monitoring system would consist of hardware for early warning, command and control, communications, and transportation. Technical solutions can expand opportunities for the detection and identification of intruders. Sensors (such as seismic, break-wire, pressure-sensing, etc.) can warn border security forces of intrusion and contribute to the identification of the intrusion and help formulate the response. This document describes conceptual options for cooperation, offering three scenarios that relate to three hypothetical levels (low, medium, and high) of cooperation. Potential cooperative efforts under a low cooperation scenario could include information exchanges on military equipment and schedules to prevent misunderstandings and the establishment of protocols for handling emergency situations or unusual circumstances. Measures under a medium cooperation scenario could include establishing joint monitoring groups for better communications, with hot lines and scheduled meetings. The high cooperation scenario describes coordinated responses, joint border patrols, and sharing border intrusion information. Finally, the document lists recommendations for organizational, technical, and operational initiatives that could be applicable to the current situation.

  3. How to be an Effective Technical Writer?

    Directory of Open Access Journals (Sweden)

    M Solaiman Ali

    2012-07-01

    Full Text Available Abstract--This paper has focused on technical writing as a skill for engineers. It has sought to define technical writing and throw light on the content and technique of writing the various components of successful technical reports (for example, articles, papers, or research reports, such as theses and dissertations. Then, it has highlighted other special features and principles of effective technical writing. The material in this paper is divided into seven major parts. Part 1 (Technical writing for engineers stresses that a successful engineering career requires strong writing skills. Part 2 (How to write the major sections or elements of a report describes the techniques of writing the abstract, introduction, literature review, procedure/methods & materials, results, discussion, conclusion, and recommendations. Part 3 (Special features of technical writing brings into focus some of the special features of technical writing such as tables & graphs in the text, graphics in instructions, team writing, ethics (plagiarism, document sources, three citation styles and IEEE reference style. Part 4 (Technical usage deals with writing abbreviations, initialisms and acronyms, numbers, units of measurement, and equations.Part 5 (Technical style highlights the imperative writing style and other features of technical writing such as the use of active and passive voices, plain vs. complex syntax, avoiding redundant or superfluous expressions, and vague generalities, using words or expressions with visual impact, the past tense to describe experimental work, the present tense to describe hypotheses, principles, theories and truths, and breaking up the text of the report into short sections. Part 6 (Document specifications emphasizes the technical writer’s need to conform to such document specifications as word count, format, font, number of words per line of text imposed. Part 7 (Reader-friendly technical writing suggests choosing the varied writing modes

  4. Macro economic linkages and impacts. Technical and fiscal options in GHG abatement

    International Nuclear Information System (INIS)

    Backus, G.; Barker, T.

    1995-01-01

    This paper discusses some of the main macro economic linkages and feedbacks associated with policies for GHG abatement. The linkages in a global model are described when OECD carbon taxes or alternatively OECD/OPEC joint action raises world oil prices with a smaller OECD carbon tax. The results give a world perspective on the GHG abatement problem. The paper continues with a discussion of the linkages and feedbacks associated with three options: demand-side management (DSM), mainly to improve end-use energy efficiency, reductions in subsidies of fossil fuel production and use, and investment in renewable energy supplies, specifically in energy forestry and associated infrastructure. It concludes that DSM and investment in renewables are unlikely on their own to bring about reduction in GHG emissions, and that new supplies may even lead to increased emissions by driving down the price of energy. However, reductions in emissions may be compatible with increased efficiency and development, as well as with improvements in the quality of the local environment and in rural living, with the new supplies replacing fossil fuel supplies, provided that real fossil fuel prices are increased via removal of subsidies and if required carbon taxes. (au) 15 refs

  5. Technical specifications for PWR secondary water chemistry

    International Nuclear Information System (INIS)

    Weeks, J.R.; van Rooyen, D.

    1977-08-01

    The bases for establishing Technical Specifications for PWR secondary water chemistry are reviewed. Whereas extremely stringent control of secondary water needs to be maintained to prevent denting in some units, sound bases for establishing limits that will prevent stress corrosion, wastage, and denting do not exist at the present time. This area is being examined very thoroughly by industry-sponsored research programs. Based on the evidence available to date, short term control limits are suggested; establishment of these or other limits as Technical Specifications is not recommended until the results of the research programs have been obtained and evaluated

  6. Load factor trends in light water reactor units

    International Nuclear Information System (INIS)

    Lehtinen, E.A.

    1990-01-01

    The Technical Research Centre of Finland follows up and analyses nuclear power plant availability performances worldwide. The results of a trend study for the load factors of the LWR units have been updated to the end of 1987. The whole operating history, in the sense of the annual and cumulative load factors achieved by all the Western commercial LWR units until the end of 1987, has been taken into consideration. Some trends in the load factors have been identified by using an exponential regression model developed. The LWR units form quite an inhomogeneous population with respect to their age, technical characteristics, site country as well as cumulative load factors achieved. The cumulative load factors achieved by all the LWR units until the end of 1987 are presented individually in the scattergrams

  7. CERN Technical Training: new courses on computer security

    CERN Multimedia

    HR Department

    2009-01-01

    Two new trainings are available at CERN concerning computer security. • How to create secure software? The "Developing secure software" course (3.5 hours) is designed for software programmers, both for regular software and Web applications. It covers main aspects of security in different phases of the software development lifecycle. The last, optional hour discusses security issues of Web application developers. This course, although not hands-on, is interactive and full of real-life examples. The first session of this course will take place, in English, on 21 April in the CERN Technical Training Centre. More sessions will be scheduled in 2009. • How to safely navigate and send mails? The "Secure e-mail and Web browsing" course is an entry-level 1.5-hour course designed to show how to detect and avoid typical security pitfalls encountered when e-mailing and browsing the Web. It is designed for non-technical users of Internet Explorer and Outlook. The first sessions ...

  8. CERN Technical Training: new courses on computer security

    CERN Multimedia

    HR Department

    2009-01-01

    Two new trainings are available at CERN concerning computer security. • How to create secure software? The "Developing secure software" course (3.5 hours) is designed for software programmers, both for regular software and Web applications. It covers main aspects of security in different phases of the software development lifecycle. The last, optional hour discusses security issues of Web application developers. This course, although not hands-on, is interactive and full of real-life examples. The first session of this course will take place, in English, on 21 April in the CERN Technical Training Centre. More sessions will be scheduled in 2009. • How to safely navigate and send mails? The "Secure e-mail and Web browsing" course is an entry-level 1.5-hour course designed to show how to detect and avoid typical security pitfalls encountered when e-mailing and browsing the Web. It is designed for non-technical users of Internet Explorer and Outlook. The first sessions o...

  9. CERN Technical Training: new courses on computer security

    CERN Multimedia

    HR Department

    2009-01-01

    Two new trainings are available at CERN concerning computer security. • How to create secure software? The "Developing secure software" course (3.5 hours) is designed for software programmers, both for regular software and Web applications. It covers main aspects of security in different phases of the software development lifecycle. The last, optional hour discusses security issues of Web application developers. This course, although not hands-on, is interactive and full of real-life examples. The first session of this course will take place, in English, on 21 April in the CERN Technical Training Center. More sessions will be scheduled in 2009. • How to safely navigate and send mails? The "Secure e-mail and Web browsing" course is an entry-level 1.5-hour training aimed to show how to detect and avoid typical security pitfalls encountered when e-mailing and browsing the Web. It is designed for non-technical users of Internet Explorer and Outlook. The first sessions o...

  10. Proposal of guidelines for selecting optimum options in packagings and transportation systems of spent fuel

    International Nuclear Information System (INIS)

    Saegusa, T.; Abe, H.; Fukuda, S.

    1983-01-01

    Type and size of spent fuel shipping packagings and packaging transport ships in spent fuel transport system would have been determined separately in response to technical requirements etc. of reactor sites and reprocessing plants. However, since more and more spent fuel will be generated from world's nuclear power plants and will be transported much frequently to reprocessing plants or storage facilities, the current spent fuel transport system will have to be necessarily reexamined from the operational and economical aspects or an optimum transport system may have to be newly determined in the near future. In the literature, a variety of options are found, particularly of spent fuel packagings. This paper listed and classified options of spent fuel packagings and packaging transport ships in the transportation systems of spent fuel on the basis of literature surveys. These options were discussed from viewpoints of designers and users and compared in terms of transport efficiency. Finally, one way to determine an optimum transport system of spent fuel was indicated considering the total transport system in the light of safety, operational efficiency and economy

  11. Technical evaluation of the proposed deletion of a reactor trip on a turbine trip below 50-percent power for the Beaver Valley nuclear power plant, Unit 1

    International Nuclear Information System (INIS)

    Reeves, W.E.

    1979-12-01

    This report documents the technical evaluation of the Duquesne Light Company's proposed license amendment for the deletion of a reactor trip on a turbine trip below 50% power for the Beaver Valley nuclear power plant, Unit 1. This report is supplied as part of the Selected Electrical, Instrumentation, and Control Systems Issues Program being conducted for the US Nuclear Regulatory Commission by Lawrence Livermore Laboratory

  12. Technical data summary supporting the spent nuclear fuel environmental impact statement, November 1993

    International Nuclear Information System (INIS)

    Geddes, R.L.; Claxton, R.E.; Lengel, J.D.

    1993-11-01

    This report has been compiled by the WSRC Nuclear Materials Processing Division's Planning Section at the request of the Office of Spent Fuel Management and Special Projects (EM-37) to support issuance of the Spent Nuclear Fuel Environmental Impact Statement. Savannah River site data evaluates five programmatic options including open-quotes No Actionclose quotes ranging up to transfer of all DOE responsibility spent fuel to the SRS. For each option, a range of management/disposition scenarios has been examined. Each case summary provides information relative to the technical proposal, technical issues, environmental impacts, and projected costs for a 50 period (to 2044) when it is assumed that the material will be dispositioned from the SRS. It must be recognized that this report was prepared under severe time constraints and contains many simplifications and assumptions. It is highly recommended that significant additional study be performed before basing key decisions upon the data contained in this report. It represents a best effort by a significant group of technical personnel familiar with nuclear materials processing, handlings and storage but it is likely that careful scrutiny will reveal numerous discrepancies and omissions. The bulk of the effort went into defining the engineering approaches necessary to execute the various mission scenarios. Collection and/or calculation of much of the various waste, emission, and utility consumption data, so important to an Environmental Impact Statement, has not been completed at this time

  13. Dynamique jointe stock/option et application aux stratégies de trading sur options

    OpenAIRE

    El Aoud , Sofiene

    2015-01-01

    This thesis explores theoretically and empirically the implications of the stock/option joint dynamics on applications related to option trading. In the first part of the thesis, we look into the relations between stock options and index options under the risk-neutral measure. The Capital Asset Pricing Model offers an adequate mathematical framework for this study as it provides a modeling approach for the joint dynamics between the stock and the index. As we compute option prices according t...

  14. Assessing the Option to Abandon an Investment Project by the Binomial Options Pricing Model

    Directory of Open Access Journals (Sweden)

    Salvador Cruz Rambaud

    2016-01-01

    Full Text Available Usually, traditional methods for investment project appraisal such as the net present value (hereinafter NPV do not incorporate in their values the operational flexibility offered by including a real option included in the project. In this paper, real options, and more specifically the option to abandon, are analysed as a complement to cash flow sequence which quantifies the project. In this way, by considering the existing analogy with financial options, a mathematical expression is derived by using the binomial options pricing model. This methodology provides the value of the option to abandon the project within one, two, and in general n periods. Therefore, this paper aims to be a useful tool in determining the value of the option to abandon according to its residual value, thus making easier the control of the uncertainty element within the project.

  15. Forecasting with Option-Implied Information

    DEFF Research Database (Denmark)

    Christoffersen, Peter; Jacobs, Kris; Chang, Bo Young

    2013-01-01

    This chapter surveys the methods available for extracting information from option prices that can be used in forecasting. We consider option-implied volatilities, skewness, kurtosis, and densities. More generally, we discuss how any forecasting object that is a twice differentiable function...... of the future realization of the underlying risky asset price can utilize option-implied information in a well-defined manner. Going beyond the univariate option-implied density, we also consider results on option-implied covariance, correlation and beta forecasting, as well as the use of option......-implied information in cross-sectional forecasting of equity returns. We discuss how option-implied information can be adjusted for risk premia to remove biases in forecasting regressions....

  16. CO2-mitigation options for the offshore oil and gas sector

    DEFF Research Database (Denmark)

    Nguyen, Tuong-Van; Tock, Laurence; Breuhaus, Peter

    2016-01-01

    , using thermodynamic, economic and environmental indicators. The results indicate the benets of all these options, as the total CO2-emissions can be reduced by more than 15% in all cases, while the avoidance costs vary widely and are highly sensitive to the natural gas price and CO2-tax.......-effcient and environmental-friendly solutions, of which three are assessed in this paper: (i) the implementation of waste heat recovery, (ii) the installation of a CO2-capture unit and (iii) the platform electrication. A North Sea platform is taken as casestudy, and these three options are modelled, analysed and compared...

  17. Benefit Analysis Report, United States Air Force Technical Order Management Systems (AFTOMS)

    Science.gov (United States)

    1989-08-01

    This report prepared by the Transportation Systems Center (TSC) concludes an analysis of the Technical Order (TO) costs and benefits, which was originally undertaken as part of the US Air Force Computer-aided Acquisition and Logistics Support (CALS) ...

  18. Technical considerations associated with spent fuel acceptance. Final report

    International Nuclear Information System (INIS)

    Supko, E.M.

    1996-06-01

    This study was initiated by the Electric Power Research Institute (EPRI) to identify technical considerations associated with spent fuel acceptance and implementation of a waste management system that includes the use of transportable storage systems, and to serve as an opening dialogue among Standard Contract Holders and the department of Energy's Office of Civilian Radioactive Waste management (OCRWM) prior to the development of waste acceptance criteria or issuance of a Notice of Proposed Rulemaking by OCRWM to amend the Standard Contract. The original purpose of the Notice of Proposed Rulemaking was to address changes to the Standard Contract to implement a multi-purpose canister based system and to address other issues that were not adequately addressed in the standard contract. Even if DOE does not develop a multi-purpose canister based system for waste acceptance, it will still be necessary to develop waste acceptance criteria in order to accept spent fuel in transportable storage systems that are being deployed for at-reactor storage. In this study, technical issues associated with spent fuel acceptance will be defined and potential options and alternatives for resolution of technical considerations will be explored

  19. The international cooperation year - Technical assistance through IAEA

    International Nuclear Information System (INIS)

    1965-01-01

    In 1964, sixty-two countries benefited from the Agency's technical assistance programme, which involved an actual expenditure of more than 3 million dollars (including some payments against obligations incurred in previous years). This represents an increase of 29 percent over the amount of $2,423,000. spent in 1963. In addition to funds provided from the Agency's own resources and from the United Nations Expanded Programme of Technical Assistance, many gifts in kind - equipment, fellowships, and expert services - were supplied through the Agency, to a value of $708,000

  20. A real option-based simulation model to evaluate investments in pump storage plants

    International Nuclear Information System (INIS)

    Muche, Thomas

    2009-01-01

    Investments in pump storage plants are expected to grow especially due to their ability to store an excess of supply from wind power plants. In order to evaluate these investments correctly the peculiarities of pump storage plants and the characteristics of liberalized power markets have to be considered. The main characteristics of power markets are the strong power price volatility and the occurrence of prices spikes. In this article a valuation model is developed capturing these aspects using power price simulation, optimization of unit commitment and capital market theory. This valuation model is able to value a future price-based unit commitment planning that corresponds to future scope of actions also called real options. The resulting real option value for the pump storage plant is compared with the traditional net present value approach. Because this approach is not able to evaluate scope of actions correctly it results in strongly smaller investment values and forces wrong investment decisions.

  1. Counter flow induced draft cooling tower option for supercritical carbon dioxide Brayton cycle

    Energy Technology Data Exchange (ETDEWEB)

    Pidaparti, Sandeep R., E-mail: sandeep.pidaparti@gmail.com [Georgia Institute of Technology, George W. Woodruff School of Mechanical Engineering, Atlanta, GA 30332 (United States); Moisseytsev, Anton; Sienicki, James J. [Argonne National Laboratory, 9700 South Cass Avenue, Argonne, IL 60439 (United States); Ranjan, Devesh, E-mail: devesh.ranjan@me.gatech.edu [Georgia Institute of Technology, George W. Woodruff School of Mechanical Engineering, Atlanta, GA 30332 (United States)

    2015-12-15

    Highlights: • A code was developed to investigate the various aspects of using cooling tower for S-CO{sub 2} Brayton cycles. • Cooling tower option to reject heat is quantitatively compared to the direct water cooling and dry air cooling options. • Optimum water conditions resulting in minimal plant capital cost per unit power consumption are calculated. - Abstract: A simplified qualitative analysis was performed to investigate the possibility of using counter flow induced draft cooling tower option to reject heat from the supercritical carbon dioxide Brayton cycle for advanced fast reactor (AFR)-100 and advanced burner reactor (ABR)-1000 plants. A code was developed to estimate the tower dimensions, power and water consumption, and to perform economic analysis. The code developed was verified against a vendor provided quotation and is used to understand the effect of ambient air and water conditions on the design of cooling tower. The calculations indicated that there exists optimum water conditions for given ambient air conditions which will result in minimum power consumption, thereby increasing the cycle efficiency. A cost-based optimization technique is used to estimate the optimum water conditions which will improve the overall plant economics. A comparison of different cooling options for the S-CO{sub 2} cycle indicated that the cooling tower option is a much more practical and economical option compared to the dry air cooling or direct water cooling options.

  2. Option price and market instability

    Science.gov (United States)

    Baaquie, Belal E.; Yu, Miao

    2017-04-01

    An option pricing formula, for which the price of an option depends on both the value of the underlying security as well as the velocity of the security, has been proposed in Baaquie and Yang (2014). The FX (foreign exchange) options price was empirically studied in Baaquie et al., (2014), and it was found that the model in general provides an excellent fit for all strike prices with a fixed model parameters-unlike the Black-Scholes option price Hull and White (1987) that requires the empirically determined implied volatility surface to fit the option data. The option price proposed in Baaquie and Cao Yang (2014) did not fit the data during the crisis of 2007-2008. We make a hypothesis that the failure of the option price to fit data is an indication of the market's large deviation from its near equilibrium behavior due to the market's instability. Furthermore, our indicator of market's instability is shown to be more accurate than the option's observed volatility. The market prices of the FX option for various currencies are studied in the light of our hypothesis.

  3. SCFA lead lab technical assistance at Oak Ridge Y-12 nationalsecurity complex: Evaluation of treatment and characterizationalternatives of mixed waste soil and debris at disposal area remedialaction DARA solids storage facility (SSF)

    Energy Technology Data Exchange (ETDEWEB)

    Hazen, Terry

    2002-08-26

    On July 17-18, 2002, a technical assistance team from the U.S. Department of Energy (DOE) Subsurface Contaminants Focus Area (SCFA) met with the Bechtel Jacobs Company Disposal Area Remedial Action (DARA) environmental project leader to review treatment and characterization options for the baseline for the DARA Solids Storage Facility (SSF). The technical assistance request sought suggestions from SCFA's team of technical experts with experience and expertise in soil treatment and characterization to identify and evaluate (1) alternative treatment technologies for DARA soils and debris, and (2) options for analysis of organic constituents in soil with matrix interference. Based on the recommendations, the site may also require assistance in identifying and evaluating appropriate commercial vendors.

  4. Technical specifications, Braidwood Station Unit Nos. 1 and 2 (Docket Nos. STN 50-456 and STN 50-457): Appendix ''A'' to License No. NPF-72, [October 1986-July 1987

    International Nuclear Information System (INIS)

    1987-07-01

    The Braidwood Station, Units 1 and 2, technical specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public

  5. Options for rural electrification in Mexico; Opcion para la electrificacion de pequenas comunidades rurales en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Vera, Jorge [Luz y Fuerza del Centro, S. A., Mexico, D. F. (Mexico)

    1994-12-31

    The paper summarizes the results obtained in the study carried out in communities of the Hidalgo State, localized in remote and of difficult access sites. In the study 19 different options, which are technically and economically feasible, from the stand point of commercialization and electrification of the same. The performance of these systems was evaluated with respect to their capability to satisfy 12 technical goals and 5 social-economical, as well as their environmental impact. An hybrid system based on photovoltaic cells, diesel or gasoline generator and a wind-power generator, we think is the recommended option for this type of communities. [Espanol] Este trabajo sintetiza los resultados de un estudio llevado a cabo en comunidades del estado de Hidalgo, localizadas en lugares remotos y de dificil acceso. En el estudio se analizaron 19 diferentes opciones que son factibles tecnica y comercialmente hablando para la electrificacion de las mismas. El comportamiento de estos sistemas fue evaluado con respecto a su capacidad para satisfacer 12 objetivos tecnicos y 5 socioeconomicos, asi como su impacto ambiental. Un sistema hibrido a base de celdas fotovoltaicas, generador a diesel o gasolina y generador eolico, creemos que es la opcion recomendada para este tipo de comunidades.

  6. Options for rural electrification in Mexico; Opcion para la electrificacion de pequenas comunidades rurales en Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Vera, Jorge [Luz y Fuerza del Centro, S. A., Mexico, D. F. (Mexico)

    1993-12-31

    The paper summarizes the results obtained in the study carried out in communities of the Hidalgo State, localized in remote and of difficult access sites. In the study 19 different options, which are technically and economically feasible, from the stand point of commercialization and electrification of the same. The performance of these systems was evaluated with respect to their capability to satisfy 12 technical goals and 5 social-economical, as well as their environmental impact. An hybrid system based on photovoltaic cells, diesel or gasoline generator and a wind-power generator, we think is the recommended option for this type of communities. [Espanol] Este trabajo sintetiza los resultados de un estudio llevado a cabo en comunidades del estado de Hidalgo, localizadas en lugares remotos y de dificil acceso. En el estudio se analizaron 19 diferentes opciones que son factibles tecnica y comercialmente hablando para la electrificacion de las mismas. El comportamiento de estos sistemas fue evaluado con respecto a su capacidad para satisfacer 12 objetivos tecnicos y 5 socioeconomicos, asi como su impacto ambiental. Un sistema hibrido a base de celdas fotovoltaicas, generador a diesel o gasolina y generador eolico, creemos que es la opcion recomendada para este tipo de comunidades.

  7. Process arrangement options for Defense waste immobilization

    International Nuclear Information System (INIS)

    1980-02-01

    Current plans are to immobilize the SRP high-level liquid wastes in a high integrity form. Borosilicate glass was selected in 1977 as the reference waste form and a mjaor effort is currently underway to develop the required technology. A large new facility, referred to as the Defense Waste Processing Facility (DWPF) is being designed to carry out this mission, with project authorization targeted for 1982 and plant startup in 1989. However, a number of other process arrangements or manufacturing strategies, including staging the major elements of the project or using existing SRP facilities for some functions, have been suggested in lieu of building the reference DWPF. This study assesses these various options and compares them on a technical and cost basis with the DWPF. Eleven different manufacturing options for SRP defense waste solidification were examined in detail. These cases are: (1) vitrification of acid waste at current generation rate; (2) vitrification of current rate acid waste and caustic sludge; (3 and 4) vitrification of the sludge portion of neutralized waste; (5) decontamination of salt cake and storage of concentrated cesium and strontium for later immobilization; (6) processing waste in a facility with lower capacity than the DWPF; (7) processing waste in a combination of existing and new facilities; (8) waste immobilization in H Canyon; (9) vitrification of both sludge and salt; (10) DWPF with onsite storage; (11) deferred authorization of DWPF

  8. Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program

    Science.gov (United States)

    Rodionova, Olga; Arneson, Heather; Sridhar, Banavar; Evans, Antony

    2017-01-01

    The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.

  9. Technical backgrounder to CAPP input on June 14, 2002 workshop on federal climate change policy options

    International Nuclear Information System (INIS)

    2002-06-01

    This paper presents arguments regarding the Federal Discussion Paper on Climate Change which presents four options for Canada to implement the Kyoto Protocol. This paper describes some major flaws with the package. The Canadian Association of Petroleum Producers (CAPP) believes that policy on climate change should ensure that measures for the trade exposed industry sectors are based on achievable objectives and that all levels of government should take a coordinated approach to greenhouse gases. In addition there should be no unfair burden on any region or unfairness in any sector. Climate change policy objectives should also consider economic, environmental and social objectives. With respect to the Kyoto Protocol in particular, governments should assess the liability that ratification would create and determine whether it makes economic sense. CAPP argues that none of the four options in the federal discussion paper meets requirements for industry objectives and form of policies. In addition, if Canada does not shift industry and emissions to other countries, or buy foreign credits, energy use by consumers would have to be significantly reduced in order to meet the Kyoto target. It was also noted that if the 'polluter pay' policy proposal is to be adopted, it must be based on a thorough understanding of what it implies and be applied in such a way to reflect the reality of international markets

  10. Development of decision- making mechanism in engineering design of phased coal mines technical upgrade

    Science.gov (United States)

    Kulak, V. Yu; Petrova, T. V.; Novichikhin, A. V.

    2017-09-01

    The approach to a choice of a new mine design and technical upgrade of operating coal mines is substantiated. The choice of the option is made in the following way: the elements of the mine technological system are defined, for each element of the system two levels of costs are allocated - capital and operational; a graph of alternative options of the system is formed by matrix enumeration taking into account the possibility of simultaneous application of different elements, up to 10 000 scenarios are formed; capital and operating costs of options are estimated in the form of coefficients as the cost-to-cost ratio in the base variant, which has already been implemented and the costs of which are already known; ranking of the options at the level of costs and the definition of the 10 preferred are performed. It is established that the application of partial enumeration allows the costs relative to the base variant to be reduced by 10 %; the main constraint of costs reduction is the need to comply with all conditions that ensure industrial safety.

  11. Communication of technical information to lay audiences

    International Nuclear Information System (INIS)

    Bowes, J.E.; Stamm, K.R.; Jackson, K.M.; Moore, J.

    1978-05-01

    One of the objectives of the National Waste Terminal Storage (NWTS) Program is to provide terminal storage facilities for commercial radioactive wastes in various geologic formations at multiple locations in the United States. The activities performed under the NWTS Program will affect regional, state, and local areas, and widespread public interest in this program is expected. Since a large part of the NWTS Program deals with technical information it was considered desirable to initiate a study dealing with possible methods of effectively transmitting this technical information to the general public. This study has the objective of preparing a state-of-the-art report on the communication of technical information to lay audiences. The particular task of communicating information about the NWTS Program to the public is discussed where appropriate. The results of this study will aid the NWTS Program in presenting to the public the quite diverse technical information generated within the program so that a widespread, thorough public understanding of the NWTS Program might be achieved. An annotated bibliography is included

  12. Greenhouse gases mitigation options and strategies for Tanzania

    Energy Technology Data Exchange (ETDEWEB)

    Mwandosya, M.J.; Meena, H.E.

    1996-12-31

    Tanzania became a party to the United Nations Framework on Climate Change (UN FCCC) when she ratified the Convention in March, 1996. Now that Tanzania and other developing countries are Parties to the UN FCCC, compliance with its provisions is mandatory. The legal requirements therefore provide a basis for their participation in climate change studies and policy formulation. All parties to the Convention are required by Article 4.1 of the United Nations Convention on Climate Change (UN FCCC) to develop, periodically update, publish, and make available national inventories of anthropogenic emissions and removal of greenhouse gases that are not controlled by the Montreal Protocol. This study on possible options for the mitigation of greenhouse gases in Tanzania is a preliminary effort towards the fulfilment of the obligation. In order to fulfil their obligations under the UN FCCC and have a meaningful mitigation assessment, identification and quantification of anthropogenic sources of atmospheric emissions of greenhouse gases in the country was undertaken. In this respect, the study of anthropogenic emissions by source and removals by sink of GHGs in Tanzania was done with the main objective of increasing the quantity and quality of base-line data available in order to further scientific understanding of the relationship of greenhouse gas emissions to climate change. Furthermore, the study facilitated identification of national policy and technological options that could reduce the level of emissions in the country.

  13. Selection of efficient options for processing and storage of radioactive waste in countries with small amounts of waste generation

    International Nuclear Information System (INIS)

    2003-09-01

    The report is intended to assist decision makers in countries using nuclear energy for non-power applications to organize their waste management practices. It describes methodologies, criteria and options for the selection of appropriate technologies for processing and storage of low and intermediate level radioactive waste from different nuclear applications. The report reviews both technical and non-technical factors important for decision making and planning, and for implementation of waste management activities at the country and facility levels. It makes practical recommendations for the selection of particular technologies for different scales of waste generation. These wastes may arise from production of radionuclides and their application in industry, agriculture, medicine, education and research. The report also considers waste generated at research reactors, research centers and research laboratories using radioisotopes, as well as waste from decommissioning of research reactors and small nuclear facilities such as hot cells, laboratories and irradiation facilities. Management of uranium mining and milling waste and management of spent fuel from research reactors are not considered in this report. Discussed in detail are: the basic legal, regulatory, administrative and technical requirements set up in a national waste management system and review of the factors and components affecting the selection of an appropriate national waste management system. the origins and characteristics of radioactive waste from different nuclear applications. the technical factors that might affect the selection of waste processing and storage technologies, the main waste management steps, information on available technologies, the basis for planning of waste processing and storage and the selection of a particular option for radioactive waste processing and storage in countries with a different scale of nuclear applications

  14. Selection of efficient options for processing and storage of radioactive waste in countries with small amounts of waste generation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-01

    The report is intended to assist decision makers in countries using nuclear energy for non-power applications to organize their waste management practices. It describes methodologies, criteria and options for the selection of appropriate technologies for processing and storage of low and intermediate level radioactive waste from different nuclear applications. The report reviews both technical and non-technical factors important for decision making and planning, and for implementation of waste management activities at the country and facility levels. It makes practical recommendations for the selection of particular technologies for different scales of waste generation. These wastes may arise from production of radionuclides and their application in industry, agriculture, medicine, education and research. The report also considers waste generated at research reactors, research centers and research laboratories using radioisotopes, as well as waste from decommissioning of research reactors and small nuclear facilities such as hot cells, laboratories and irradiation facilities. Management of uranium mining and milling waste and management of spent fuel from research reactors are not considered in this report. Discussed in detail are: the basic legal, regulatory, administrative and technical requirements set up in a national waste management system and review of the factors and components affecting the selection of an appropriate national waste management system. the origins and characteristics of radioactive waste from different nuclear applications. the technical factors that might affect the selection of waste processing and storage technologies, the main waste management steps, information on available technologies, the basis for planning of waste processing and storage and the selection of a particular option for radioactive waste processing and storage in countries with a different scale of nuclear applications.

  15. Life cycle assessment of bagasse waste management options

    International Nuclear Information System (INIS)

    Kiatkittipong, Worapon; Wongsuchoto, Porntip; Pavasant, Prasert

    2009-01-01

    Bagasse is mostly utilized for steam and power production for domestic sugar mills. There have been a number of alternatives that could well be applied to manage bagasse, such as pulp production, conversion to biogas and electricity production. The selection of proper alternatives depends significantly on the appropriateness of the technology both from the technical and the environmental points of view. This work proposes a simple model based on the application of life cycle assessment (LCA) to evaluate the environmental impacts of various alternatives for dealing with bagasse waste. The environmental aspects of concern included global warming potential, acidification potential, eutrophication potential and photochemical oxidant creation. Four waste management scenarios for bagasse were evaluated: landfilling with utilization of landfill gas, anaerobic digestion with biogas production, incineration for power generation, and pulp production. In landfills, environmental impacts depended significantly on the biogas collection efficiency, whereas incineration of bagasse to electricity in the power plant showed better environmental performance than that of conventional low biogas collection efficiency landfills. Anaerobic digestion of bagasse in a control biogas reactor was superior to the other two energy generation options in all environmental aspects. Although the use of bagasse in pulp mills created relatively high environmental burdens, the results from the LCA revealed that other stages of the life cycle produced relatively small impacts and that this option might be the most environmentally benign alternative

  16. Advanced radioisotope power source options for Pluto Express

    International Nuclear Information System (INIS)

    Underwood, M.L.

    1995-01-01

    In the drive to reduce mass and cost, Pluto Express is investigating using an advanced power conversion technology in a small Radioisotope Power Source (RPS) to deliver the required mission power of 74 W(electric) at end of mission. Until this year the baseline power source under consideration has been a Radioisotope Thermoelectric Generator (RTG). This RTG would be a scaled down GPHS RTG with an inventory of 6 General Purpose Heat Sources (GPHS) and a mass of 17.8 kg. High efficiency, advanced technology conversion options are being examined to lower the power source mass and to reduce the amount of radioisotope needed. Three technologies are being considered as the advanced converter technology: the Alkali Metal Thermal-to-Electric Converter (AMTEC), Thermophotovoltaic (TPV) converters, and Stirling Engines. Conceptual designs for each of these options have been prepared. Each converter would require only 2 GPHSs to provide the mission power and would have a mass of 6.1, 7.2, and 12.4 kg for AMTEC, TPV, and Stirling Engines respectively. This paper reviews the status of each technology and the projected performance of an advanced RPS based on each technology. Based on the projected performance and spacecraft integration issues, Pluto Express would prefer to use the AMTEC based RPS. However, in addition to technical performance, selection of a power technology will be based on many other factors

  17. The technical writer's handbook writing with style and clarity

    CERN Document Server

    Young, Matt

    2002-01-01

    "The Technical Writer's Handbook" is by a practising scientist who screens hundreds of manuscripts each year. It is directed at scientists, engineers and others who want to improve their writing and communication. It teaches that technical writing, although it has its own special requirements, is no different from ordinary writing and should be written with short, clear sentences and in the active voice. Divided into two parts, the first part is an introduction to technical and report writing and provides a sort of prescription for writing and organizing technical papers of all kinds. The second part is written in dictionary format and contains entries on grammar, style, and organization, as well as entries on topics such as common errors, resume writing, metric units, jargon, conference proceedings, figures, tables and slides. A comprehensive list of cross-references reveals related topics quickly and easily.

  18. Early Option Exercise

    DEFF Research Database (Denmark)

    Heje Pedersen, Lasse; Jensen, Mads Vestergaard

    A classic result by Merton (1973) is that, except just before expiration or dividend payments, one should never exercise a call option and never convert a convertible bond. We show theoretically that this result is overturned when investors face frictions. Early option exercise can be optimal when...... it reduces short-sale costs, transaction costs, or funding costs. We provide consistent empirical evidence, documenting billions of dollars of early exercise for options and convertible bonds using unique data on actual exercise decisions and frictions. Our model can explain as much as 98% of early exercises...

  19. Early Option Exercise

    DEFF Research Database (Denmark)

    Jensen, Mads Vestergaard; Heje Pedersen, Lasse

    2016-01-01

    A classic result by Merton (1973) is that, except just before expiration or dividend payments, one should never exercise a call option and never convert a convertible bond. We show theoretically that this result is overturned when investors face frictions. Early option exercise can be optimal when...... it reduces short-sale costs, transaction costs, or funding costs. We provide consistent empirical evidence, documenting billions of dollars of early exercise for options and convertible bonds using unique data on actual exercise decisions and frictions. Our model can explain as much as 98% of early exercises...

  20. Design Options to Reduce Development Cost of First Generation Surface Reactors

    International Nuclear Information System (INIS)

    Poston, David I.; Marcille, Thomas F.

    2006-01-01

    Low-power surface reactors have the potential to have the lowest development cost of any space reactor application, primarily because system alpha (mass/kg) is not of utmost importance and mission lifetimes do not have to be a decade or more. Even then, the development cost of a surface reactor can vary substantially depending on the performance requirements (e.g. mass, power, lifetime, reliability) and technical development risk deemed acceptable by the end-user. It is important for potential users to be aware of these relationships before they determine their future architecture (i.e. decide what they need). Generally, the greatest potential costs of a space reactor program are a nuclear-powered ground test and extensive material development campaigns, so it is important to consider options that can minimize the need for or complexity of such tasks. The intended goal of this paper is to inform potential surface reactor users of the potential sensitivities of surface reactor development cost to design requirements, and areas where technical risk can be traded with development cost

  1. Quality assured technical documentation for nuclear power generation

    International Nuclear Information System (INIS)

    Ault, M.P.

    1992-01-01

    Present day large scale industry in general is made up of highly complex technology subjected to many rigorous external controls and constraints. This is particularly so in the nuclear power industry where it is essential that materials and services provided during the phases of construction, commissioning and operations, conform precisely to requirements as specified. Failure to do this could lead to unit shut-down and loss of income. For over 25 years, a central unit within the Central Electricity Generating Board (CEGB) developed an enviable reputation for the production of high class technical documentation essential during power station commissioning and operations phases. Following privatization of the electricity supply industry in 1991 the unit became a stand-alone organization and since 1989 has been known as Technical Publications Management Services (TPMS). TPMS with its many years of experience now offers its services to industry in general as well as to the electricity supply industry. Work currently being undertaken by TPMS is described here. Recent contracts obtained for work at Sizewell and for Severn Trent Water indicate the continuing and expanding need for specialist documentation services. (author)

  2. ACCIDENT ANALYSES & CONTROL OPTIONS IN SUPPORT OF THE SLUDGE WATER SYSTEM SAFETY ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    WILLIAMS, J.C.

    2003-11-15

    This report documents the accident analyses and nuclear safety control options for use in Revision 7 of HNF-SD-WM-SAR-062, ''K Basins Safety Analysis Report'' and Revision 4 of HNF-SD-SNF-TSR-001, ''Technical Safety Requirements - 100 KE and 100 KW Fuel Storage Basins''. These documents will define the authorization basis for Sludge Water System (SWS) operations. This report follows the guidance of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports'', for calculating onsite and offsite consequences. The accident analysis summary is shown in Table ES-1 below. While this document describes and discusses potential control options to either mitigate or prevent the accidents discussed herein, it should be made clear that the final control selection for any accident is determined and presented in HNF-SD-WM-SAR-062.

  3. Technical evaluation report on the monitoring of electric power to the reactor-protection system for the Brunswick Steam Electric Plant, Units 1 and 2

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the monitoring of electric power to the reactor protection system (RPS) at the Brunswick Steam Electric Plant, Units 1 and 2. The evaluation is to determine if the proposed design modification will protect the RPS from abnormal voltage and frequency conditions which could be supplied from the power supplies and will meet certain requirements set forth by the Nuclear Regulatory Commission. The proposed design modifications with time delays verified by GE, will protect the RPS from sustained abnormal voltage and frequency conditions from the supplying sources

  4. Transfemoral Filter Eversion Technique following Unsuccessful Retrieval of Option Inferior Vena Cava Filters: A Single Center Experience.

    Science.gov (United States)

    Posham, Raghuram; Fischman, Aaron M; Nowakowski, Francis S; Bishay, Vivian L; Biederman, Derek M; Virk, Jaskirat S; Kim, Edward; Patel, Rahul S; Lookstein, Robert A

    2017-06-01

    This report describes the technical feasibility of using the filter eversion technique after unsuccessful retrieval attempts of Option and Option ELITE (Argon Medical Devices, Inc, Athens, Texas) inferior vena cava (IVC) filters. This technique entails the use of endoscopic forceps to evert this specific brand of IVC filter into a sheath inserted into the common femoral vein, in the opposite direction in which the filter is designed to be removed. Filter eversion was attempted in 25 cases with a median dwell time of 134 days (range, 44-2,124 d). Retrieval success was 100% (25/25 cases), with an overall complication rate of 8%. This technique warrants further study. Copyright © 2017 SIR. Published by Elsevier Inc. All rights reserved.

  5. Expensing options solves nothing.

    Science.gov (United States)

    Sahlman, William A

    2002-12-01

    The use of stock options for executive compensation has become a lightning rod for public anger, and it's easy to see why. Many top executives grew hugely rich on the back of the gains they made on their options, profits they've been able to keep even as the value they were supposed to create disappeared. The supposed scam works like this: Current accounting regulations let companies ignore the cost of option grants on their income statements, so they can award valuable option packages without affecting reported earnings. Not charging the cost of the grants supposedly leads to overstated earnings, which purportedly translate into unrealistically high share prices, permitting top executives to realize big gains when they exercise their options. If an accounting anomaly is the problem, then the solution seems obvious: Write off executive share options against the current year's revenues. The trouble is, Sahlman writes, expensing option grants won't give us a more accurate view of earnings, won't add any information not already included in the financial statements, and won't even lead to equal treatment of different forms of executive pay. Far worse, expensing evades the real issue, which is whether compensation (options and other-wise) does what it's supposed to do--namely, help a company recruit, retain, and provide the right people with appropriate performance incentives. Any performance-based compensation system has the potential to encourage cheating. Only ethical management, sensible governance, adequate internal control systems, and comprehensive disclosure will save the investor from disaster. If, Sahlman warns, we pass laws that require the expensing of options, thinking that's fixed the fundamental flaws in corporate America's accounting, we will have missed a golden opportunity to focus on the much more extensive defects in the present system.

  6. Real Options Valuation of U.S. Federal Renewable Energy Research,Development, Demonstration, and Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Siddiqui, Afzal S.; Marnay, Chris; Wiser, Ryan H.

    2005-03-01

    Benefits analysis of US Federal government funded research, development, demonstration, and deployment (RD3) programs for renewable energy (RE) technology improvement typically employs a deterministic forecast of the cost and performance of renewable and nonrenewable fuels. The benefits estimate for a program derives from the difference between two forecasts, with and without the RD3 in place. The deficiencies of the current approach are threefold: (1) it does not consider uncertainty in the cost of non-renewable energy (NRE), and the option or insurance value of deploying RE if and when NRE costs rise; (2) it does not consider the ability of the RD3 manager to adjust the RD3 effort to suit the evolving state of the world, and the option value of this flexibility; and (3) it does not consider the underlying technical risk associated with RD3, and the impact of that risk on the programs optimal level of RD3 effort. In this paper, a rudimentary approach to determining the option value of publicly funded RE RD3 is developed. The approach seeks to tackle the first deficiency noted above by providing an estimate of the options benefit of an RE RD3 program in a future with uncertain NRE costs.While limited by severe assumptions, a computable lattice of options values reveals the economic intuition underlying the decision-making process. An illustrative example indicates how options expose both the insurance and timing values inherent in a simplified RE RD3 program that coarsely approximates the aggregation of current Federal RE RD3.This paper also discusses the severe limitations of this initial approach, and identifies needed model improvements before the approach can adequately respond to the RE RD3 analysis challenge.

  7. Nuclear development in the United States

    International Nuclear Information System (INIS)

    Brewer, S.

    1983-01-01

    The history of the nuclear development in the United States has been one of international cooperation relations so far. The United States is to offer the technical information on atomic energy utilization to foreign countries in exchange for the guarantee that they never attempt to have or develop nuclear weapons. Actually, the United States has supplied the technologies on nuclear fuel cycle and other related fields to enable other countries to achieve economical and social progress. The Department of Energy clarified the public promise of the United States regarding the idea of international energy community. The ratio of nuclear power generation to total electric power supply in the United States exceeded 12%, and will exceed 20% by 1990. Since 1978, new nuclear power station has not been ordered, and some of the contracted power stations were canceled. The atomic energy industry in the United States prospered at the beginning of 1970s, but lost the spirit now, mainly due to the institutional problems rather than the technical ones. As the policy of the government to eliminate the obstacles, the improvement of the procedure for the permission and approval, the establishment of waste disposal capability, the verification of fast breeder reactor technology and the promotion of commercial fuel reprocessing were proposed. The re-establishment of the United States as the reliable supplier of atomic energy service is the final aim. (Kako, I.)

  8. Assessment of the Technical Maturity of Generation IV Concepts for Test or Demonstration Reactor Applications, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Gougar, Hans David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-10-01

    The United States Department of Energy (DOE) commissioned a study the suitability of different advanced reactor concepts to support materials irradiations (i.e. a test reactor) or to demonstrate an advanced power plant/fuel cycle concept (demonstration reactor). As part of the study, an assessment of the technical maturity of the individual concepts was undertaken to see which, if any, can support near-term deployment. A Working Group composed of the authors of this document performed the maturity assessment using the Technical Readiness Levels as defined in DOE’s Technology Readiness Guide . One representative design was selected for assessment from of each of the six Generation-IV reactor types: gas-cooled fast reactor (GFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), supercritical water-cooled reactor (SCWR), sodium-cooled fast reactor (SFR), and very high temperature reactor (VHTR). Background information was obtained from previous detailed evaluations such as the Generation-IV Roadmap but other technical references were also used including consultations with concept proponents and subject matter experts. Outside of Generation IV activity in which the US is a party, non-U.S. experience or data sources were generally not factored into the evaluations as one cannot assume that this data is easily available or of sufficient quality to be used for licensing a US facility. The Working Group established the scope of the assessment (which systems and subsystems needed to be considered), adapted a specific technology readiness scale, and scored each system through discussions designed to achieve internal consistency across concepts. In general, the Working Group sought to determine which of the reactor options have sufficient maturity to serve either the test or demonstration reactor missions.

  9. Distributed Energy Implementation Options

    Energy Technology Data Exchange (ETDEWEB)

    Shah, Chandralata N [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-13

    This presentation covers the options for implementing distributed energy projects. It distinguishes between options available for distributed energy that is government owned versus privately owned, with a focus on the privately owned options including Energy Savings Performance Contract Energy Sales Agreements (ESPC ESAs). The presentation covers the new ESPC ESA Toolkit and other Federal Energy Management Program resources.

  10. Engineering Technical Support Center Annual Report Fiscal ...

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  11. Technical evaluation of RETS-required reports for Turkey Point Units No. 3 and 4

    International Nuclear Information System (INIS)

    Magleby, E.H.; Young, T.E.; Henscheid, J.W.

    1985-01-01

    A review of the reports required by Federal regulations and the plant specific Radiological Effluent Technical Specifications (RETS) for operations conducted during 1983 was performed. The periodic reports reviewed were the Annual Radiological Environmental Operating Report for 1983 and Semiannual Radioactive Effluent Release Reports for 1983. The principal review guidelines were the plant's specific RETS, NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants'', and NRC Guidance on the Review of the Process Control Programs. The Licensee's submitted reports were found to be reasonably complete and consistent with the review guidelines

  12. Further technical development in magnetic resonance imaging of the brain in children

    International Nuclear Information System (INIS)

    Young, I.R.; Dubowitz, L.M.S.; Pennock, J.M.; Bydder, G.M.

    1988-01-01

    Further technical developments implemented in magnetic resonance imaging (MRI) of the brain in children are described. These include the use of longer data collection periods, T2-dependent field echoes, susceptibility mapping, short inversion time inversion recovery sequences, very long echo time spin-echo sequences, and phase mapping techniques to detect tissue perfusion. These techniques are illustrated in selected cases and have increased the range of options available in MR examinations of children. (author)

  13. Technical co-operation report for 2002. Report by the Director General

    International Nuclear Information System (INIS)

    2003-08-01

    developmental impact. The development of Country Programme Frameworks (CPFs) progressed further in 2002, with new CPFs concluded or at an advanced stage of preparation for 29 more Member States. Thematic plans were prepared for food irradiation, river basin management and the role of isotopic techniques in the control of communicable diseases. The Agency increased its involvement in international efforts to promote development through intensified consultation and collaboration with the United Nations system, multilateral banks, regional organizations and other relevant bodies. As part of its activities to develop strategic partnerships, the Agency signed Memoranda of Understanding with the Common Fund for Commodities, the Transplant Procurement Management Project (University of Barcelona), the National Atomic Energy Agency of Argentina and the University of Buenos Aires. A new form of partnership was entered with the Nuclear Threat Initiative to support the decommissioning of a research reactor in Serbia and Montenegro. In addition, contacts were strengthened between the Agency and regional development organizations to ensure that policies for development programmes complement each other. During 2002, achievements were made in many areas of implementation of the technical co-operation programme. Training events, expert missions and equipment procurement supported national and regional efforts to initiate or improve cancer therapy facilities. Different government nutrition supplementation programmes benefited from Agency expertise to verify they had the impact expected. In the area of water resource management, an ongoing regional project brought together more than 30 water institutes to solve water shortage problems. And in several regions, plans to construct mass- rearing facilities for medfly and tsetse were a testament that national and regional authorities are committed to the sterile insect technique for the control of insect pests. In response to resolution GC(46)/RES/10

  14. Risk assessments for mixtures: technical methods commonly used in the United States

    Science.gov (United States)

    A brief (20 minute) talk on the technical approaches used by EPA and other US agencies to assess risks posed by combined exposures to one or more chemicals. The talk systemically reviews the methodologies (whole-mixtures and component-based approaches) that are or have been used ...

  15. Technical specifications for the Oak Ridge Critical Experiments Facility

    International Nuclear Information System (INIS)

    Stinnett, R.M.

    1986-01-01

    These Technical Specifications for the Oak Ridge Critical Experiments Facility (CEF) delineate limiting conditions of operation for the facility. The CEF is used primarily for testing the High Flux Isotope Reactor (HFIR) fuel assemblies. Specifically, the Criticality Testing Unit, Liquid (CTUL), located in the CEF, is used for the HFIR fuel assembly test. The test is performed to satisfy the surveillance requirements of the HFIR Technical Specifications. The test is used to determine the water-submerged shutdown margin for each fuel assembly. 11 refs

  16. 78 FR 9959 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Science.gov (United States)

    2013-02-12

    ... (including stock-option order) order types as eligible for the Rule 6.11 opening process. If, in the future... 100 units and the only interest in the COB is a complex order to buy the strategy at a net debit price... a complex order in COB to buy the strategy at a net debit price of $1.19 for 50 units. When the COB...

  17. The United States and Europe: Possible Options for U.S. Policy

    National Research Council Canada - National Science Library

    Archick, Kristin

    2005-01-01

    The United States and Europe share a long and intertwined history, replete with many ups and downs The modern transatlantic relationship was forged in the aftermath of World War II to deter the Soviet...

  18. 32 CFR 48.201 - Options.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Options. 48.201 Section 48.201 National Defense...'S FAMILY PROTECTION PLAN Election of Options § 48.201 Options. As provided in § 48.203, a member may... amount equal to such 121/2 per centum. (a) Option 1 is an annuity payable to or on behalf of his widow...

  19. Standard Guide for Evaluating Disposal Options for Concrete from Nuclear Facility Decommissioning

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2002-01-01

    1.1 This standard guide defines the process for developing a strategy for dispositioning concrete from nuclear facility decommissioning. It outlines a 10-step method to evaluate disposal options for radioactively contaminated concrete. One of the steps is to complete a detailed analysis of the cost and dose to nonradiation workers (the public); the methodology and supporting data to perform this analysis are detailed in the appendices. The resulting data can be used to balance dose and cost and select the best disposal option. These data, which establish a technical basis to apply to release the concrete, can be used in several ways: (1) to show that the release meets existing release criteria, (2) to establish a basis to request release of the concrete on a case-by-case basis, (3) to develop a basis for establishing release criteria where none exists. 1.2 This standard guide is based on the “Protocol for Development of Authorized Release Limits for Concrete at U.S. Department of Energy Sites,” (1) from ...

  20. Alternative Approaches to Technical Efficiency Estimation in the Stochastic Frontier Model

    OpenAIRE

    Acquah, H. de-Graft; Onumah, E. E.

    2014-01-01

    Estimating the stochastic frontier model and calculating technical efficiency of decision making units are of great importance in applied production economic works. This paper estimates technical efficiency from the stochastic frontier model using Jondrow, and Battese and Coelli approaches. In order to compare alternative methods, simulated data with sample sizes of 60 and 200 are generated from stochastic frontier model commonly applied to agricultural firms. Simulated data is employed to co...

  1. A case for reviving the nuclear option

    International Nuclear Information System (INIS)

    Smith, S.H. Jr.

    1991-01-01

    The US simply cannot afford to ignore an energy source that provides the economic, environmental, and strategic benefits that nuclear power has provided over the past three decades. Compared to the mix of coal, oil, and gas that would have been used to generate electricity in its absence, nuclear power has saved American consumers almost $5 billion in electricity charges since 1973; has cut annual SO 2 emissions by 5 million tons, NO x emissions by 2 million tons, and CO 2 emissions by 128 million tons; and has reduced annual oil imports by 270 million barrels. Indications are that the new advanced design reactors presently under development will be able to provide consumers with competitively priced electricity for decades to come. However, political issues, not technical ones, stand in the way. The industry is doing its part to make nuclear energy a viable option. But the industry cannot do it alone. Universities, environmental groups, political organizations, and others also have important roles to play

  2. Excess plutonium disposition: The deep borehole option

    International Nuclear Information System (INIS)

    Ferguson, K.L.

    1994-01-01

    This report reviews the current status of technologies required for the disposition of plutonium in Very Deep Holes (VDH). It is in response to a recent National Academy of Sciences (NAS) report which addressed the management of excess weapons plutonium and recommended three approaches to the ultimate disposition of excess plutonium: (1) fabrication and use as a fuel in existing or modified reactors in a once-through cycle, (2) vitrification with high-level radioactive waste for repository disposition, (3) burial in deep boreholes. As indicated in the NAS report, substantial effort would be required to address the broad range of issues related to deep bore-hole emplacement. Subjects reviewed in this report include geology and hydrology, design and engineering, safety and licensing, policy decisions that can impact the viability of the concept, and applicable international programs. Key technical areas that would require attention should decisions be made to further develop the borehole emplacement option are identified

  3. Shaft Position Influence on Technical Characteristics of Universal Two-Stages Helical Speed Reducers

    OpenAIRE

    Мilan Rackov; Zeljko Kanovic; Sinisa Kuzmanovic; Ruzica Trbojevic

    2005-01-01

    Purchasers of speed reducers decide on buying those reducers, that can the most approximately satisfy their demands with much smaller costs. Amount of used material, ie. mass and dimensions of gear unit influences on gear units price. Mass and dimensions of gear unit, besides output torque, gear unit ratio and efficiency, are the most important parameters of technical characteristics of gear units and their quality. Centre distance and position of shafts have significant influence on output t...

  4. 75 FR 52459 - Regulations Governing Agencies for Issue of United States Savings Bonds; Offering of United...

    Science.gov (United States)

    2010-08-26

    ... eliminate the option to purchase paper savings bonds through payroll deductions for United States government... savings bonds purchased through payroll sales; individuals will still be able to purchase paper savings bonds at financial institutions for themselves and as gifts. Payroll savers will be encouraged to...

  5. Technological Options to Ameliorate Waste Treatment of Intensive Pig Production in China:An Analysis Based on Bio-Economic Model

    Institute of Scientific and Technical Information of China (English)

    LU Wen-cong; MA Yong-xi; Holger Bergmann

    2014-01-01

    Ameliorating waste treatment by technological improvements affects the economic and the ecological-environment beneifts of intensive pig production. The objective of the research was to develop and test a method to determine the technical optimization to ameliorate waste treatment methods and gain insight into the relationship between technological options and the economic and ecological effects. We developed an integrated bio-economic model which incorporates the farming production and waste disposal systems to simulate the impact of technological improvements in pig manure treatment on economic and environmental benefits for the case of a pilot farm in Beijing, China. Based on different waste treatment technology options, three scenarios are applied for the simulation analysis of the model. The simulation results reveal that the economic-environmental beneifts of the livestock farm could be improved by reducing the cropland manure application and increasing the composting production with the current technologies. Nevertheless, the technical efifciency, the waste treatment capacity and the economic beneifts could be further improved by the introduction of new technologies. It implies that technological and economic support policies should be implemented comprehensively on waste disposal and resource utilization to promote sustainable development in intensive livestock production in China.

  6. Strategies and options for electricity generation in Egypt up to 2020

    International Nuclear Information System (INIS)

    Yassin, I. M.; Megahed, M. M.; Motayasser, S. S.

    2004-01-01

    Over the period 1970-2000, the total primary energy requirements in Egypt have increased from 7.8 million tones of oil equivalent (Mtoe) to 44.2 Mtoe. In the same period, electricity generation has increased from 6.7 TWh to 73.3 TWh. The demand for both primary energy and electricity is expected to continue at higher growth rates in the future due to the ambitious governmental plans aiming at increasing the gross domestic product (GDP) at an average annual growth rate of 8% up to the year 2020. Because of the limited fossil fuel energy resources and the almost fully utilized hydro energy, Egypt has been considering for sometime the various options for satisfying the increasing demand for electricity, including nuclear energy. To this end, the Nuclear Power Plants Authority carried out a comparative study of the various strategies and options for electricity generation in Egypt with technical assistance from the International Atomic Energy Agency (IAEA) utilizing the DECADES Tool. The main objective of the study was to determine the optimal electricity generation mix up to the year 2020, including nuclear and renewable (solar and wind) energies. DECADES is restricted by some limitation that it did not take into its consideration modeling of some energy forms and systems such as simulation of Renewable Energy Options (REO), in particular thermal/solar and wind plants and simulation of Independent Power Producers (IPP). REO and IPP, as well as the nuclear energy option are expected to play an important role in the future electricity generation mix in Egypt. Therefore it is important to consider its effects economically and environmentally when studying the best expansion system in Egypt. This paper presents the modifications for DECADES modeling to enable simulation for the above energy forms and systems, as well as the results of the comparative assessment study.(author)

  7. 48 CFR 570.401 - Renewal options.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Renewal options. 570.401... Requirements 570.401 Renewal options. (a) Exercise of options. Before exercising an option to renew, follow the... survey. Before exercising an option to renew a lease, review current market information to ensure the...

  8. Potential advantages and disadvantages of sequentially building small nuclear units instead of a large nuclear plant

    International Nuclear Information System (INIS)

    Feretic, D.; Cavlina, N.; Grgic, D.

    2008-01-01

    Renewal of nuclear power programs in countries with modest electricity consumptions and weak electrical grid interconnections has raised the question of optimal nuclear power plants sizes for such countries. The same question would be also valid for isolated or weakly connected regions within a large country. Building large size nuclear power plant could be prevented by technical or financial limits. Research programs have been initiated in the International Atomic Energy Agency and in the USA (within the framework of the Global Nuclear Energy Partnership (GNEP) program) with the aim to inspect under which circumstances small and medium reactors could be the preferred option compared to large nuclear plants. The economy of scale is a clear advantage of large plants. This paper compares, by using probabilistic methods, the net cash flow of large and medium size plants, taking as example a large nuclear plant (around 1200 MW) and four sequentially built smaller plants (300 MW). Potential advantages and disadvantageous of both options have been considered. Main advantages of the sequential construction of several identical small units could be the reduced investor risk and reduced investment costs due to the learning effect. This analysis is a part of studies for the Croatian power generating system development. (orig.)

  9. Treatment Options for Wilms Tumor

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... come back) after it has been treated. Treatment Option Overview Key Points There are different types of ...

  10. Treatment Options for Myelodysplastic Syndromes

    Science.gov (United States)

    ... special light. Certain factors affect prognosis and treatment options. The prognosis (chance of recovery) and treatment options ... age and general health of the patient. Treatment Option Overview Key Points There are different types of ...

  11. Treatment Option Overview (Prostate Cancer)

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  12. Treatment Option Overview (Myelodysplastic Syndromes)

    Science.gov (United States)

    ... special light. Certain factors affect prognosis and treatment options. The prognosis (chance of recovery) and treatment options ... age and general health of the patient. Treatment Option Overview Key Points There are different types of ...

  13. Treatment Option Overview (Esophageal Cancer)

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  14. Treatment Option Overview (Childhood Rhabdomyosarcoma)

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  15. Treatment Option Overview (Penile Cancer)

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  16. Treatment Option Overview (Vulvar Cancer)

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  17. Treatment Option Overview (Pancreatic Cancer)

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  18. Treatment Option Overview (Adrenocortical Carcinoma)

    Science.gov (United States)

    ... affect the prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  19. Treatment Options for Childhood Rhabdomyosarcoma

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...

  20. Treatment Options for Kaposi Sarcoma

    Science.gov (United States)

    ... factors affect prognosis (chance of recovery) and treatment options. The prognosis (chance of recovery ) and treatment options ... or in other parts of the body. Treatment Option Overview Key Points There are different types of ...