  1. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  2. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  3. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  4. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  5. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  6. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  7. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  8. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  9. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  10. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  11. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  12. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  13. Indian Point Station, Unit 1 and 2. Semiannual operating report No. 24, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 1 was 519,130 MWH with the reactor critical for 2,400.39 hours and the generator on line for 2,316.14 hours. Unit 2 generated 2,427,828 MWH electrical power, was critical for 3,590.31 hours and the generator was on line for 3,485.41 hours. Operations and maintenance are summarized. Information is presented concerning radioactive effluent releases, occupational personnel radiation protection, primary coolant chemistry, changes, tests, and experiments. Environmental radioactivity is discussed. (U.S.)

  14. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  15. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  16. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  17. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  18. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2, Docket nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1989-08-01

    In August 1983 the staff of the Nuclear Regulatory commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for the licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984. Supplement 4 was issued in May 1985. Supplement 5 was issued in July 1985. Supplement 6 was issued in August 1985 and Supplement 7 was issued in April 1989. Supplement 7 addresses the major design differences between Units 1 and 2, the resolution of all issues that remained open when the Unit 1 full-power license was issued, the staff's assessment regarding the application by the licensee to operate Unit 2 and issues that require resolution before issuance of an operating license for Unit 2. Supplements 8 and 9 address further issues that require resolution prior to issuance of an operating license. 1 tab

  19. Limited field investigation report for the 100-DR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km 2 (0.59 mi 2 ) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  20. Numerical Analysis of Loss of Residual Heal Removal System (RHRS) during Mid-Loop Operation for Hanul NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sook Kwan; Park, Seong Gyu; Han, Sang Koo [ACT Co., Daejeon (Korea, Republic of)

    2016-10-15

    As a part of supporting LPSD (Low Power and Shutdown) PSA (Probabilistic Safety Assessment) of Hanul NPP units 1 and 2, numerical analysis for a loss of RHRS (Residual Heat Removal system) during midloop operation was performed using RELAP5/MOD3.3 code. The one of main purpose of thermal hydraulic analysis for PSA work is to estimate times allowable for operation actions in each accident. A loss of RHRS during mid-loop operation may cause more significant results than during RCS full condition due to reduced RCS inventory. In order to perform this kind of analysis, it is particularly important to establish a steady state of mid-loop operational initial condition. Mid-loop operation corresponds to POS(Plant Operational State) 5 and 11 in the category of LPSD PSA at Hanul NPP units 1 and 2. RELAP5/MOD3.3 code was used to predict behaviors of RCS and fuels for the case of loss of RHRS during mid-loop operation at Hanul NPP units 1 and 2. The initial state of mid-loop operational condition was established by proper control of charging and letdown flow. Considering existing similar analysis results for this kind of accident, it can be concluded that RELAP5 code well predicts reasonably the behavior of RCS for loss of RHRS during mid-loop operation in Hanul NPP units 1 and 2. Thus the method developed in the analysis can be applied reasonably to support LPSD PSA.

  1. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  2. Phase 1 remedial investigation report for 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  3. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  4. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  5. Surry Power Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electric power generated by Unit 1 was 2,315,124 MWH(e) and Unit 2 generated 2,062,954 MWH(e) with Unit 1 generator on line for 3,157.8 hrs and Unit 2 on line for 2,881.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  6. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  7. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  8. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  9. Operation of Browns Ferry, Units 1 and 2 following the March 22, 1975 fire. Safety evaluation report

    International Nuclear Information System (INIS)

    1976-03-01

    The Safety Evaluation Report issued February 23, 1976, presents the NRC evaluation regarding the acceptability of the restoration and modifications at the Browns Ferry Plant Units 1 and 2, following the March 22, 1975 fire, to establish that the facility may be operated in the restored and modified condition without endangering the health and safety of the public. The modifications involved enhancing separation of redundant safeguards equipment by some rerouting of cable and by the application of a fire-retardant coating to the cable; enhancing fire extinguishing capability by the addition of fixed spray and sprinkler systems and expanded smoke and heat detection systems; and enhancing the overall fire protection program by changes in procedures, training, and organization. The NRC staff indicated some items that remained to be resolved prior to operation and concluded that subject to their satisfactory resolution the restoration of Browns Ferry Nuclear Plants Units 1 and 2 including the modifications is acceptable and that there is reasonable assurance that the health and safety of the public will not be endangered by operation of the facility as restored and modified

  10. Qualitative risk assessment for the 100-NR-2 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This qualitative risk assessment provides information about the 100- NR-2 Groundwater Operable Unit of the Hanford reservation. Topics discussed in this report are: data evaluation; human health risk assessment overview; ecological evaluations; summary of uncertainty; results of both the ecological and human health evaluations; toxicity assessment; risk characterization; and a summary of contaminants of potential concern

  11. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Science.gov (United States)

    2011-01-04

    ... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance... Web site http://www.regulations.gov . Because your comments will not be edited to remove any... will not edit their comments to remove any identifying or contact information, and therefore, they...

  12. Fessenheim 2: ASN's green light for continuing operation - Beginning of the works for unit 1

    International Nuclear Information System (INIS)

    Anon.

    2013-01-01

    Every 10 years a nuclear power plant operator has to make a re-assessment of the nuclear safety standard of his plant. This re-assessment is made of 2 parts: first the review of the safety conformity and secondly a thorough re-examination of the safety that takes into account today's safety standards and feedback experience from similar plants. This detailed assessment of the safety aims at checking that the consequences of the different aging phenomena are well mastered for the next 10 years at least. At the end of this re-assessment, the ASN (French Nuclear Safety Authorities) decide or not the continuation of plant activity or can prescribe safety improvements. In the case of the unit 2 of the Fessenheim plant that has just finished its third decennial safety re-assessment, the ASN has prescribed the same improvements as for the unit 1, that is to say the reinforcement of the resistance to corium of the foundation raft and an improvement on the emergency cooling system. The works on the unit 1 have begun despite contestation from anti-nuclear associations that question the cost of the safety upgrading (20 to 30 millions euros) while the unit is expected to be decommissioned by end 2016. (A.C.)

  13. Safety-evaluation report related to operation of McGuire Nuclear Station, Units 1 and 2. Docket Nos. 50-369 and 50-370

    International Nuclear Information System (INIS)

    1983-05-01

    This report supplements the Safety Evaluation Report Related to the Operation of McGuire Nuclear Station, Units 1 and 2 (SER (NUREG-0422)) issued in March 1978 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, as applicant and owner, for licenses to operate the McGuire Nuclear Station, Units 1 and 2 (Docket Nos. 50-369 and 50-370). The facility is located in Mecklenburg County, North Carolina, about 17 mi north-northwest of Charlotte, North Carolina. This supplement provides information related to issuance of a full-power authorization for Unit 2. The staff concludes that the McGuire Nuclear Station can be operated by the licensee without endangering the health and safety of the public

  14. The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.R.; Heo, T.Y.; Cho, B.H. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of); Kang, T.G.; Kim, H.M.; Kim, Y.S.; Oh, S.M.; Kang, Y.S. [Korea Electric Power Data Network Co., Seoul (Korea, Republic of)

    1997-12-31

    Due to aging of the imported seismic monitoring system of Uljin of t 1 and 2 units it is difficult for this system to provide enough functions needed for the security of seismic safety and the evaluation of the earthquake data from the seismic instrumentation. For this reason, it is necessary to replace the seismic monitoring system of Uljin 1 and 2 units with a new system which has the localized and upgraded hardware and corresponding software. In the part of standardization of existing seismic monitoring system, furthermore, it is necessary to develop the seismic wave analysis system which incorporate newly developed software and can real-timely analyze the seismic wave. This report is the finial product of research project ``The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2`` which have been performed from June 1996 to June 1997 by KEPRI and KDN. Main accomplishments - Review of regulatory criteria for seismic monitoring system -Analysis and upgrade of hardware system -Analysis and upgrade of software system - Development of seismic wave analysis system. (author). 17 refs., 49 figs., 6 tabs.

  15. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Science.gov (United States)

    2011-05-24

    ... Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice of Consideration of Issuance..., http://www.regulations.gov . Because your comments will not be edited to remove any identifying or... received from other persons for submission to the NRC inform those persons that the NRC will not edit their...

  16. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  17. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  18. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  19. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  20. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  1. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  2. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment (QRA). The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, bum pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy [DOE], the US Environmental Protection Agency [EPA], and Washington Department of Ecology [Ecology]) during the preparation of the 100-HR-2 Operable Unit work plan (DOE/RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure (IRM) as per the Hanford Past-Practice Strategy (HPPS) (DOE/RL 1991) and negotiations with DOE, EPA, and Ecology. An IRM is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The investigative phase was conducted in accordance with the RCRA Facility Investigation/Corrective Measures Study Work Plan for the 100-HR-2 Operable Unit (DOE/RL 1993f). The QRA was performed in accordance with the Hanford Site Baseline Risk Assessment Methodology (DOE/RL 1993b) and the recommendations incorporate the strategies of the HPPS. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and (4) provide a human health and ecological QRA associated with solid waste burial grounds

  3. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  4. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  5. Quad-Cities Station, Units 1 and 2. Annual report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 2,246,757 MWh(e) with the generator on line 4,287.5 hrs while Unit 2 generated 1,729,147 MWh(e) with the generator on line 3,056.21 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, and experiments

  6. Safety analysis report for decommissioning of KNPP units 1 and 2

    International Nuclear Information System (INIS)

    Ivanova, A.; Ovcharova, I.

    2008-01-01

    At present units 1 and 2 possess a license for operation in mode „E‟ – storage of the spent fuel in the spent fuel pools. According to the order of BNSA, from the beginning of December 2006 the licenses for operation of KNPP units 1 and 2 have been modified; this does not change the current status – operation of the units in mode „E‟ , but allows for dismantling of the systems and equipment, which are not important for safety and do not contain radioactive substances above the free release levels. The next step is obtaining a licence for Stage 1 decommissioning activities – Safe enclosure (SE) and dismantling in Turbine hall. The development of Decommissioning Safety Analysis Report (DSAR) is one of the documents needed for this license. The specific features of the units and decommitioning options are described

  7. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  8. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  9. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1995-07-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment. The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, burn pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy, the US Environmental Protection Agency, and Washington State Department of Ecology during the preparation of the 100-HR-2 Operable Unit Work Plan (DOE-RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure as per the Hanford Past-Practice Strategy (DOE-RL 1991) and negotiations with the Department of Energy, US Environmental Protection Agency, and Washington State Department of Ecology. An interim remedial measure is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and 4) provide a human health and ecological QRA associated with solid waste burial grounds

  10. Quad-Cities Station, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 3,393,062 MWH with the generator on line 5,703.0 hrs. Unit 2 generated 4,304,684 MWH with the generator on line 7,145.3 hrs. Information is presented concerning modifications, maintenance, power generation, shutdowns, occupational radiation exposures, and organization

  11. 100-HR-1 Operable Unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives (phases 1 and 2) and the detailed analysis of alternatives (phase 3). This focused feasibility study (FFS) constitutes the phase 3 portion of the FS process. The FFS process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific FFS document, such as this one. The FFS process is performed by implementing a ''plug-in'' style approach as defined in great detail in the Process Document. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for sites associated with the 100-HR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  12. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  13. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  14. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  15. Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323)

    International Nuclear Information System (INIS)

    1991-06-01

    Supplement 34 to the Safety Evaluation Report for the application by Pacific Gas and Electric Company (PG ampersand E) for licenses to operate Diablo Canyon Nuclear Power Plant, Unit Nos. 1 and 2 (Docket Nos. 50-275 and 50-323, respectively) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement documents the NRC staff review of the Long-Term Seismic Program conducted by PG ampersand E in response to License Condition 2.C.(7) of Facility Operating License DPR-80, the Diablo Canyon Unit 1 operating license. 111 refs., 20 figs., 31 tabs

  16. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  17. Final environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-08-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  18. Safety-Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2. Docket Nos. 50-416 and 50-417

    International Nuclear Information System (INIS)

    1983-05-01

    Supplement 4 to the Safety Evaluation Report for Mississippi Power and Light Company, et. al., joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status on the resolution of those issues that required further evaluation before authorizing operation of Unit 1 above 5% rated power and other issues that were to be evaluated during the first cycle of power operation

  19. Erie Nuclear Plant, Units 1 and 2. License application, preliminary safety analysis report, volume 1: chapter 1

    International Nuclear Information System (INIS)

    1977-01-01

    Erie 1 and 2 reactors will be located on a site consisting of 1,740 acres in Berlin Township about 2.4 miles south of Lake Erie and 8.9 miles southeast of Sandusky, Ohio. Lake Erie will provide makeup water. The ultimate heat sink will be a 40 acre cooling reservoir shared by both units. Each unit has a proposed core thermal power level of 3,760 MW(t) and a nominal net capacity of about 1282 MW(e). Unit 1 is scheduled for commercial operation by 4/1/84 and Unit 2 by 4/1/86. Fuel will be Zircaloy-4 clad tubes containing cylindrical fuel pellets of UO 2 . B and W pressurized water reactor units to be employed are described in DOCKET-STN-50561

  20. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2006-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Units 2 that will extend the in-service life of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from the bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  1. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  2. Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323)

    International Nuclear Information System (INIS)

    1983-12-01

    Supplement 20 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plant, Unit 1 and Unit 2 (Docket Nos. 50-275 and 50-323), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports on the verification effort for Diablo Canyon Unit 1 that was performed between November 1981 and the present in response to Commission Order CLI-81-30 and an NRC letter of November 19, 1981 to the licensee. Specifically, Supplement 20 addresses those issues and other matters identified in Supplements 18 and 19 that must be resolved prior to Unit 1 achieving criticality and operating at power levels up to 5% of rated full power. This SER Supplement applies only to Diablo Canyon Unit 1

  3. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352-50-353). Supplement 1

    International Nuclear Information System (INIS)

    1983-12-01

    This report supplements the Safety Evaluation Report (NUREG-0991, August 1983) for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353). The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  4. Phase 1 and 2 feasibility study report for the 300-FF-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The 300-FF-1 Operable Unit (OU) feasibility study (FS) presented in this document completes the FS process only through the first two study phases: Phase I, Remedial Alternatives Development, and Phase II, Remedial Alternatives Screening in accordance with CERCIA guidance for performing Remedial Investigations and Feasibility Studies (RI/FS) (EPA 1988a). This Phase I/II study provides a generalized view of workable remedial technologies as applied to the site contamination problems as a whole. Phase III, Detailed Analysis of Alternatives, will be performed at a later date to further evaluate screened alternatives based on the nine criteria in the CERCLA RI/FS guidance. The purpose of this Phase I/II FS is to develop and screen a range of alternatives for remediation of contamination present in the vadose zone of the 300-FF-1 OU. The scope of work for this Phase I/II FS includes five primary tasks: 1. Review existing documents and their associated data from relevant investigations and studies; 2. Establish remedial action objectives (RAO) and general response actions (GRA); 3. Identify applicable or relevant and appropriate requirements (ARARS) pertinent to all general response actions (including waste disposal); 4. Develop remedial alternatives (Phase I) applicable to the 300-FF-1 OU including identification and screening of technologies and process options, and assembly of remedial alternatives from representative technology types; 5. Screen alternatives (Phase II) developed in Phase I for implementability, effectiveness, and cost to identify those alternatives which warrant advancement to the detailed analysis phase (Phase III) of the FS.

  5. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement 3

    International Nuclear Information System (INIS)

    1984-10-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2. Supplement 1 was issued in December 1983 and addressed several outstanding issues. Supplement 1 also contains the comments made by the Advisory Committee on Reactor Safeguards in its report dated October 18, 1983. Supplement 2 was issued in October 1984 and addressed fourteen outstanding and fifty-three confirmatory issues and closed them put. This Supplement 3 addresses the remaining issues that require resolution before issuance of the operating license for Unit 1 and closes them out

  6. Final Environmental Statement related to the operation of Perry Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    The information in this Final Environmental Statement is the second assessment of the environmental impact associated with the construction and operation of the Perry Nuclear Power Plant, Units 1 and 2, located on Lake Erie in Lake County, about 11 km (7 mi) northeast of Painesville, Ohio. The first assessment was the Final Environmental Statement related to the construction of the plant issued in April 1974, prior to issuance of the construction permits (CPRR-148 and CPPR-149). Plant construction for Unit 1 is currently about 83% complete, and Unit 2 about 43% complete. Fuel loading for Units 1 and 2 currently estimated by the licensee (Cleveland Electric Illuminating Company) for November 1983, with Unit 2 fuel load scheduled for May 1987. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the plant

  7. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    International Nuclear Information System (INIS)

    Chu, T.L.; Pratt, W.T.

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144

  8. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Pratt, W.T. [eds.; Musicki, Z. [Brookhaven National Lab., Upton, NY (United States)

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144.

  9. Pressure tube replacement in Pickering NGS A units 1 and 2

    International Nuclear Information System (INIS)

    Irvine, H.S.; Bennett, E.J.; Talbot, K.H.

    1986-10-01

    Being able to technically and economically replace the most radioactive components (excluding the nuclear fuel) in operating reactors will help to ensure the ongoing acceptance of nuclear power as a viable energy source for the future. Ontario Hydro is well along the path to meeting the above objective for its CANDU-PHW reactors. Following the failure of a Zircaloy-II pressure tube in unit 2 of Pickering NGS A in August, 1983, Ontario Hydro has embarked on a program to replace all Zircaloy-II pressure tubes in units 1 and 2 at Pickering. This program integrates the in-house research, design, construction, and operating skills of a large utility (Ontario Hydro) with the skills of a national nuclear organization (Atomic Energy of Canada Limited) and the private engineering sector of the Canadian nuclear industry. The paper describes the background to the pressure tube failure in Pickering unit 2 and to the efforts incurred in understanding the failure mechanism and how similar failures are not expected for the zirconium-niobium pressure tube material used in all other large CANDU-PHW units after units 1 and 2 of Pickering NGS A. The tooling developed for the pressure tube replacement program is described as well as the organization to undertake the program in an operating nuclear station. The retubing of units 1 and 2 at Pickering NGS A is nearing a successful completion and shows the benefits of being able to integrate the various skills required for this success. Pressure tube replacement in a CANDU-PHW reactor is equivalent to replacement of the reactor vessel in a LWR. The fact that this replacement can be done economically and with acceptable radiation dose to workers augurs well for the continued viability of the use of nuclear energy for the benefit of mankind. (author)

  10. Safety Evaluation Report related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455). Supplement No. 7

    International Nuclear Information System (INIS)

    1986-11-01

    Supplement No. 7 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power operation for Unit 2

  11. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2 (Docket Nos. 50-387 and 50-388). Suppl.6

    International Nuclear Information System (INIS)

    1984-03-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the applicant and/or licensee) and the Allegheny Electric Cooperative, Inc. (co-applicant) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. This supplement to NUREG-0776 addresses the remaining issues that required resolution before licensing operation of Unit 2 and closes them out

  12. Safety evaluation report related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 8 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by th Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement provides recent information regarding resolution of the license conditions identified in the SER. Because of the favorable resolution of the items discussed in this report, the staff concludes that the Byron Station, Unit 2 can be operated by the licensee at power levels greater than 5% without endangering the health and safety of the public

  13. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2007-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Unit 2 that will extend the in-service tile of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from he bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  14. Safety evaluation report related to the operation of Midland Plant, Units 1 and 2. Docket Nos. 50-329 and 50-330, Consumers Power Company

    International Nuclear Information System (INIS)

    1982-10-01

    This report supplements the Safety Evaluation Report related to the Operation of Midland Plant, Units 1 and 2 (SER) (NUREG-0793) issued in May 1982 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Consumers Power Company, as applicant and owner, for licenses to operate the Midland Plant, Units 1 and 2 (Docket Nos. 50-329 and 50-330). The facility is located in the city of Midland in Midland County, Michigan. This supplement provides recent information regarding resolution of the soils settlement issue, one of the open items identified in the SER. Certain confirmatory issues identified in the SER also are addressed

  15. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  16. Final environmental statement related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1984-06-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of Braidwood Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be moderate. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of operating licenses for Braidwood Station, Units 1 and 2. 27 figures, 23 tables

  17. Draft environmental statement related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1983-12-01

    The Draft Environment Statement contains the second assessment of the environmental impact associated with the operation of Braidwood Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomi effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of operating licenses for Braidwood Station, Units 1 and 2

  18. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement 2

    International Nuclear Information System (INIS)

    1984-10-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. This supplement addresses further issues that require resolution and closes them out

  19. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  20. Safety Evaluation Report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement No. 6

    International Nuclear Information System (INIS)

    1986-05-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, Saluda River Electric Cooperative, Inc., and Piedmont Municipal Power Agency, as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 miles) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for operation above 5% power and power ascension to full-power operation for Unit 2

  1. FIND: Douglas Point Nuclear Generating Station, Units 1 and 2

    International Nuclear Information System (INIS)

    Moore, M.M.

    1975-12-01

    This index is presented as a guide to microfiche items 1 through 136 in Docket 50448, which was assigned to Potomac Electric Power Company's Application for Licenses to construct and operate Douglas Point Nuclear Generating Station, Units 1 and 2. Information received from August, 1973 through July, 1975 is included

  2. Safety Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417). Supplement 6

    International Nuclear Information System (INIS)

    1984-08-01

    Supplement 6 to the Safety Evaluation Report for Mississippi Power and Light Company et al. joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the NRC staff's evaluation of open items from previous supplements and Technical Specification changes required before authorizing operation of Unit 1 above 5% of rated power

  3. Final Environmental Statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1989-10-01

    In September 1981, the staff of the Nuclear Regulatory Commission (NRC) issued its Final Environmental Statement (NUREG-0775) related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446), located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. The NRC has prepared this supplement to NUREG-0775 to present its evaluation of the alternative of operating Comanche Peak with the installation of further severe-accident-mitigation design features. The NRC has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns and bearing on the licensing of Comanche Peak Steam Electric Station, Units 1 and 2. 6 refs., 3 tabs

  4. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  5. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 17

    International Nuclear Information System (INIS)

    Tam, P.S.

    1995-10-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April.1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), Supplement No. 15 (June 1995), and Supplement No. 16 (September 1995) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50--390 and 50--391). The facility is located in Rhea county, Tennessee, near the Watts Bar Dam on the Tennessee River. In this supplement, NRC examines the significant problems of construction quality and quality assurance effectiveness that led TVA to withdraw its certification in 1985 that Watts Bar Unit I was ready to load fuel. Also discussed are the extensive corrective actions performed by TVA according to its nuclear performance plans and other supplemental programs, and NRC's extensive oversight to determine whether the Watts Bar Unit 1 construction quality and TVA's operational readiness and quality assurance effectiveness are adequate for a low-power operating license to be issued. SSER 17 does not address Watts Bar Unit 2, except for the systems which are necessary to support Unit 1 operation

  6. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on a site in Montgomery and Chester Counties, Pennsylvania. A license for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4, issued in May 1985, addressed some of these issues. Supplement 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1. Supplement 5, issued in July 1985, and this Supplement 6 address further issues, principally the status of offsite emergency planning, that require resolution prior to proceeding beyond the five percent power level

  7. Report on geological surveys in the 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Sandness, G.A.

    1991-03-01

    This report describes a set of geophysical surveys performed by the Pacific Northwest Laboratory at selected locations within the 300-FF-1 Operable Unit at Hanford. Field work and preliminary data processing activities were initiated in September 1989. These actions were terminated by the Westinghouse Hanford Company before completion in December 1989. Work was reinitiated in October 1990, to complete the processing of the data that had already been collected and to report the results. Because the field work was only partially completed, the task objectives, as presented in the Statement of Work, could not be fully met. This report is, therefore, a progress report covering the work performed through December 11, 1989. This task involved (1) ground-penetrating radar surveys of the 618-4 and 618-5 Burial Grounds, and (2) ground-penetrating radar and electromagnetic induction surveys along the assumed routes of the abandoned process sewers and radioactive liquid waste sewers in the 300-FF-1 Operable Unit. The surveys in the burial grounds were intended to identify burial trenches and pits, to determine the depth of fill, and to locate waste materials, including any that might be outside the perimeter fences. The surveys along the sewer routes were intended, first, to confirm the locations of the sewers as shown on existing maps or to otherwise accurately determine their locations, and second, to attempt to identify locations of possible leaks. 3 refs., 3 figs., 2 tabs

  8. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60 Co, 90 Sr, and 137 Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  9. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  10. Safety Evaluation Report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1989-05-01

    This report is Supplement No. 8 to the Safety Evaluation Report (SER) (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public. 2 figs., 1 tab

  11. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  12. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1988-06-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986; the second supplement was issued in October 1986; the third supplement was issued in May 1987; the fourth supplement was issued in July 1987 in support of the full power license for Unit 1; the fifth supplement was issued in December 1987 in support of the low power license for Unit 2. This sixth supplement to NUREG-1002 is in support of the full-power license for Unit 2 and provides the status of items that remained unresolved at the time Supplement 5 was published. The facility is located in Reed Township, Will County, Illinois

  13. Safety Evaluation Report related to the operation of LaSalle County Station, Units 1 and 2. Docket Nos. 50-373 and 50-374

    International Nuclear Information System (INIS)

    1984-03-01

    This supplement to the Safety Evaluation Report of Commonwealth Edison Company's application for a license to operate its La Salle County Station, Unit 2, located in Brookfield Township, La Salle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement is to update evaluations on Unit 2 issues identified in the previous Safety Evaluation Report and Supplements that need resolution prior to issuance of the full power operating license for Unit 2

  14. Draft environmental statement related to the operation of Shearon Harris Nuclear Power Plant, Units 1 and 2. Docket Nos. STN 50-400 and STN 50-401

    International Nuclear Information System (INIS)

    1983-04-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Shearon Harris Nuclear Power Plant, Units 1 and 2, pursuant to the National Environmental Policy Act of 1979 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socio-economic effects of the project will be beneficial. The action called for is the issuance of an operating license for Shearon Harris PLant, Units 1 and 2

  15. Safety Evaluation Report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1990-03-01

    This report is Supplement No. 9 to the Safety Evaluation Report (SER) (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2. It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public. 70 refs., 1 fig., 1 tab

  16. Safety evaluation report related to the operation of Seabrook Station, Units 1 and 2. Docket Nos. 50-443 and 50-444. Suppl. 1

    International Nuclear Information System (INIS)

    1983-04-01

    This report supplements the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et. al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  17. Safety Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417). Supplement No. 5

    International Nuclear Information System (INIS)

    1984-08-01

    Supplement 5 to the Safety Evaluation Report for Mississippi Power and Light Company, et al., joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status on the resolution of those issues that require further evaluation before authorizing operation of Unit 1 above 5% of rated power

  18. Safety evaluation report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457)

    International Nuclear Information System (INIS)

    1983-11-01

    The Safety Evaluation Report for the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Reed Township, Will County, Illinois. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  19. Safety Evaluation Report related to the operation of Cartawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement No. 5

    International Nuclear Information System (INIS)

    1986-02-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, Saluda River Electric Cooperative, Inc., and Piedmont Municipal Power Agency, as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power operation for Unit 2

  20. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2

    International Nuclear Information System (INIS)

    1995-09-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985). Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992). Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993). Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), and Supplement No. 15 (June 1995) issued by the Office of Nuclear Reactor Regulation of the U.S. Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos, 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  1. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  2. Development of diagnostic process for abnormal conditions of Ulchin units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Hyun Soo; Kwak, Jeong Keun; Yun, Jung Hyun; Kim, Jong Hyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2012-10-15

    Diagnosis of abnormal conditions during operation is one of difficult tasks to nuclear power plant operators. Operators may have trouble in handling abnormal conditions due to various reasons such as 1) many alarms (around 2,000 alarms in the Ulchin units 1 and 2 each) and multi alarms occurrences, 2) the same alarms occurrences in different abnormal conditions, and 3) a number of Abnormal Operating Procedures (AOPs). For these reasons, the first diagnosis on abnormal conditions largely relies on operator's experiences and pattern recognition. Then, this difficulty may be highlighted for inexperienced operators. This paper suggests an approach to develop the optimal diagnostic process for appropriate selection of AOPs by using the Elimination by Aspect (EBA) method. The EBA method uses a heuristic followed by decision makers during a process of sequential choice and which constitutes a good balance between the cost of a decision and its quality. At each stage of decision, the individuals eliminate all the options not having an expected given attribute, until only one option remains. This approach is applied to steam generator level control system abnormal procedure for Ulchin units 1 and 2. The result indicates that the EBA method is applicable to the development of optimal process on diagnosis of abnormal conditions.

  3. Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323). Supplement No. 30

    International Nuclear Information System (INIS)

    1985-04-01

    Supplement 30 to the Safety Evaluation Report for the application by the Pacific Gas and Electric Company (PG and E) to operate the Diablo Canyon Nuclear Power Plant - Unit 2 (Docket No. 50-323) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. SSER 30 reports on the staff's technical review and evaluation of the design and analysis of Unit 2 piping systems and pipe supports. The staff effort includes an evaluation of PG and E's treatment of issues raised during the Unit 1 design verification, actions resulting from low power License Condition 2.C.(11) in the Unit 1 low power license DPR-76 and the Unit 2 applicability and resolution of certain allegations related to piping and supports

  4. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 4

    International Nuclear Information System (INIS)

    1985-05-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the applicant) for licenses to operate the Limerick Generating Station, Units 1 and 2 located on a site in Montgomery and Chester Counties, Pennsylvania. A license (NPF-27) for the operation of Limerick Unit 1 was issued on October 26, 1984. The license, which was restricted to a five percent power level, contained conditions which required resolution prior to proceeding beyond the five percent power level. This Supplement 4 to the SER addresses some of those technical issues and their associated license conditions which require resolution prior to proceeding beyond the five percent power level. The remaining issues to be addressed prior to proceeding beyond the five percent power level will be addressed in a later supplement to this report. This Supplement 4 to the SER also contains the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984, regarding full power operation of Limerick Unit 1

  5. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414)

    International Nuclear Information System (INIS)

    1984-07-01

    The report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for fuel loading and precriticality testing for Unit 1

  6. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). Supplement No. 2

    International Nuclear Information System (INIS)

    1986-10-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986. This second supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time Supplement 1 was published. The facility is located in Reed Township, Will County, Illinois

  7. Safety-evaluation report related to the operation of Seabrook Station, Units 1 and 2. Docket Nos. 50-443 and 50-444

    International Nuclear Information System (INIS)

    1983-06-01

    This report is Supplement 2 to the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  8. Final environmental statement related to the operation of Limerick Generating Station, Units 1 and 2, Docket Nos. 50-352 and 50-353, Philadelphia Electric Company

    International Nuclear Information System (INIS)

    1989-08-01

    In April 1984 the staff of the Nuclear Regulatory Commission issued its Final Environmental Statement (NUREG-0974) related to the operation of Limerick Generating Station, Units 1 and 2, (Docket Nos. 50-352 and 50-353), located on the Schuylkill River, near Pottstown, in Limerick Township, Montgomery and Chester Counties, Pennsylvania. The NRC has prepared this supplement to NUREG-0974 to present its evaluation of the alternative of facility operation with the installation of further severe accident mitigation design features. The NRC staff has discovered no substantial changes in the proposed action as previously evaluated in the Final Environmental Statement that are relevant to environmental concerns nor significant new circumstances or information relevant to environmental concerns and bearing on the licensing of Limerick Generating Station, Units 1 and 2. 15 refs., 10 tabs

  9. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  10. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  11. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  12. Safety evaluation report related to the operation of Nine Mile Point Nuclear Station, Unit No. 2 (Docket No. 50-410). Supplement No. 1

    International Nuclear Information System (INIS)

    1985-06-01

    This report supplements the Safety Evaluation Report for the application filed by Niagara Mohawk Power Corporation, as applicant and co-owner, for a license to operate the Nine Mile Point Nuclear Station Unit 2. The facility is located near Oswego, New York. Subject to favorable resolution of the issues discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public. 1 fig., 3 tabs

  13. Draft Environmental Statement related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1984-10-01

    This Draft Environmental Statement contains an assessment of the environmental impact associated with the operation of the Vogtle Electric Generating Plant, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, part 51 (10 CFR 51), as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation

  14. Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323). Suppl. 22

    International Nuclear Information System (INIS)

    1984-03-01

    Supplement 22 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plants, Unit 1 and 2 (Docket Nos. 50-275 and 50-323), has been prepared jointly by the Office of Nuclear Reactor Regulation and the Region V Office of the US Nuclear Regulatory Commission. This supplement provides the criteria that were used by the staff to determine which of the allegations that have been evaluated and must be resolved prior to Unit 1 achieving criticality and operating at power level up to 5 percent of rated power (i.e., low power operation). The supplement also reports on the status of the staff's investigation, inspection and evaluation of 219 allegations or concerns that have been identified to the NRC as of March 9, 1984, excluding those recently received under 10 CFR 2.206 petitions

  15. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  16. Draft environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). Houston Lighting and Power Company

    International Nuclear Information System (INIS)

    1986-03-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the ''Code of Federal Regulations,'' Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archaeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  17. Safety-evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1983-08-01

    The Safety Evaluation Report for the application filed by the Philadelphia Electric Company, as applicant and owner, for licenses to operate the Limerick Generating Station Units 1 and 2 (Docket Nos. 50-352 and 50-353), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near Pottstown, Pennsylvania. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  18. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414)

    International Nuclear Information System (INIS)

    1984-12-01

    This report supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc., as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides additional information supporting the license for initial criticality and power ascension to full-power opertion for Unit 1

  19. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  20. Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353). Supplement No. 5

    International Nuclear Information System (INIS)

    1985-07-01

    In August 1983 the NRC issues its Safety Evaluation Report regarding the application for licenses to operate the Limerick Generating Station, Units 1 and 2 located on a site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 was issued in December 1983 and addressed several outstanding issues. SSER 1 also contains the comments made by the Advisory Committee on Reactor Safeguards in its interim report dated October 18, 1983. Supplement 2 was issued in October 1984. Supplement 3 was issued in October 1984 and addressed the remaining issues that required resolution before issuance of the operating licence for Unit 1. On October 26, 1984 a license (NPF-27) for Unit 1 was issued which was restricted to a five percent power level and contained conditions which required resolution prior to proceeding beyond the five percent power level. Supplement 4 issued in May 1985 addressed some of the technical issues and their associated license conditions, which required resolution prior to proceeding beyond the five percent power level. SSER 4 also contained the comments made by the Advisory Committee on Reactor Safeguards in its report dated November 6, 1984. This Supplement 5 to the SER addresses further issues that require resolution prior to proceeding beyond the five percent power level

  1. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  2. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  3. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  4. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). Supplement No. 1

    International Nuclear Information System (INIS)

    1986-09-01

    In November 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457). The facility is located in Reed Township, Will County, Illinois. This first supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time the Safety Evaluation Report was published

  5. Final environmental statement related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1982-04-01

    The proposed action is the issuance of an operating license to Commonwealth Edison Company (CECo) of Chicago, Illinois, for startup and operation of the Byron Station, Units 1 and 2 on a 710-ha (1754-acre) site in Ogle County 6 km (4 miles) south-southwest of Byron, Illinois, and 3 km (2 miles) east of the Rock River. Each of the two generating units consists of a pressurized-water reactor, four steam generators, one steam turbine generator, a heat-dissipation system, and associated auxiliary and engineered safeguards. Information is presented under the following topics: purpose and need for the action; alternatives to the proposed action; project description and affected environment; environmental consequences and mitigating actions; evaluation of the proposed action; list of contributors; list of agencies and organizations requested to comment on the draft environmental statement; and responses to comments on the Draft Environmental Statement

  6. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  7. Final environmental statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1981-09-01

    The proposed action is the issuance of operating licenses to the Texas Utilities Generating Company for the startup and operation of Units 1 and 2 of the Comanche Peak Steam Electric Station located on Squaw Creek Reservoir in Somervell County, Texas, about 7 km north-northeast of Glen Rose, Texas, and about 65 km southwest of Fort Worth in north-central Texas. The information in this environmental statement represents the second assessment of the environmental impact associated with the Comanche Peak Steam Electric Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receiving an application to construct this station, the staff carried out a review of impact that would occur during its construction and operation. This evaluation was issued as a Final Environmental Statement -- Construction Phase. After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Glen Rose, Texas, the US Atomic Energy Commission (now US Nuclear Regulatory Commission) issued construction permits for the construction of Units 1 and 2 of the Comanche Peak Steam Electric Station. 16 figs., 34 tabs

  8. Safety evaluation report related to the operation of Byron Station, Units 1 and 2. Docket Nos. STN 50-454 and STN 50-455

    International Nuclear Information System (INIS)

    1983-01-01

    Supplement No. 2 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  9. Survey method for radiological surveys of 300 FF-1 Operable Unit soil and materials

    International Nuclear Information System (INIS)

    Greif, A.A.

    1997-06-01

    This technical basis document is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by the Radiological Control Technician to determine if excavated areas require continued remediation in accordance with the Record of Decision for the operable unit

  10. Final environmental statement related to the operation of North Anna Power Station, Units 1 and 2: (Docket Nos. 50-338 and 50-339)

    International Nuclear Information System (INIS)

    1980-08-01

    The proposed action is the issuance of Operating Licenses to the Virginia Electric and Power Company for the startup and operation of the North Anna Power Station, Units No. 1 and 2, located on Lake Anna in Louisa County, 40 miles east of Charlottesville, Virginia. The information in this second addendum responds to the Commission's directive that the staff address in narrative form the environmental dose commitments and health effects from fuel cycle releases, fuel cycle socioeconomic impacts, and possible cumulative impacts pending further treatment by rulemaking

  11. Draft environmental statement related to the operation of Limerick Generating Station, Units 1 and 2. Docket Nos. 50-352 and 50-353

    International Nuclear Information System (INIS)

    1983-06-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Limerick Generating Station, Units 1 and 2, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights of way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity

  12. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414). Supplement 2

    International Nuclear Information System (INIS)

    1984-06-01

    This report supplements the Safety Evaluation Report (NUREG-0954) and Supplement 1 with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc., as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos., 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides more recent information regarding resolution or updating of some of the open and confirmatory issues and license conditions identified in the Safety Evaluation Report

  13. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  14. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  15. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    International Nuclear Information System (INIS)

    Brehm, D.M.

    1998-06-01

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  16. Safety evaluation report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1986-05-01

    This report is Supplement 4 to the Safety Evaluation Report (SER, NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hamphsire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  17. Safety evaluation report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444)

    International Nuclear Information System (INIS)

    1987-10-01

    This report is Supplement No. 7 to the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al. for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  18. Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323). Supplement No. 26

    International Nuclear Information System (INIS)

    1984-07-01

    Supplement 26 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plants, Units 1 and 2 (Docket Nos. 50-275 and 50-323), has been prepared jointly by the Office of Nuclear Reactor Regulation and the Region V Office of the US Nuclear Regulatory Commission. The supplement reports on the status of the staff's investigation, inspection and evaluation of those allegations or concerns that have been identified to the NRC as of July 8, 1984. The report specifically addresses those allegations which the staff determined must be satisfactorily resolved prior to full power operation of Diablo Canyon Unit 1

  19. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1988-01-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This seventh supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved following issuance of Supplement 6, and documents completion of several Unit 1 license conditions

  20. Draft Environmental Statement related to the operation of Seabrook Station, Units 1 and 2. Docket Nos. 50-443 and 50-444, Public Service Company of New Hampshire, et al

    International Nuclear Information System (INIS)

    1982-05-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Seabrook Station, Units 1 and 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines: the effected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Seabrook Station, Units 1 and 2

  1. Safety Evaluation Report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457)

    International Nuclear Information System (INIS)

    1987-05-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986; the second supplement to NUREG-1002 was issued in October 1986. This third supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time Supplement 2 was published. The facility is located in Reed Township, Will County, Illinois

  2. Safety evaluation report related to operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket nos. 50-327 and 50-328, Tennessee Valley Authority

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-03-01

    A safety evaluation of the Tennessee Valley Authority's application for a license to operate its Sequoyah Nuclear Plant, Units 1 and 2, located in Hamilton County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. It consists of a technical review and staff evaluation of applicant information on: (1) population density, land use, and physical characteristics of the site area; (2) design, fabrication, construction, testing criteria, and performance characteristics of plant structures, systems, and components important to safety; (3) expected response of the facility to anticipated operating transients, and to postulated design basis accidents; (4) applicant engineering and construction organization, and plans for the conduct of plant operations; and (5) design criteria for a system to control the plant's radiological effluents. The staff has concluded that the plant can be operated by the Tennessee Valley Authority without endangering the health and safety of the public provided that the outstanding matters discussed in the report are favorably resolved. (author)

  3. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  4. 75 FR 43571 - Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; Environmental Assessment And...

    Science.gov (United States)

    2010-07-26

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-413 and 50-414; NRC-2010-0260] Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; Environmental Assessment And Finding of No Significant... Energy Carolinas, LLC (the licensee), for operation of the Catawba Nuclear Station, Units 1 and 2...

  5. Safety evaluation report related to the operation of LaSalle County Station, Units 1 and 2, (Docket Nos. 50-373 and 50-374). Supplement No. 7

    International Nuclear Information System (INIS)

    1983-12-01

    Supplement No. 7 to the Safety Evaluation Report of Commonwealth Edison Company's application for a license to operate its La Salle County Station, Unit 2, located on Brookfield Township, La Salle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement is to update our evaluations on Unit 2 issues identified in the previous Safety Evaluation Report and Supplements that need resolution prior to issuance of the operating license for Unit 2

  6. Indian Point Station, Units 1, 2, and 3. Annual operations report No. 27: January--December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    Unit 1 remained shutdown with the fuel removed to the Fuel Handling Building pending a decision by the Company on the installation of an ECCS. Information for Unit 2 and 3 is presented concerning procedure changes, tests, experiments, maintenance, equipment examinations, radioactivity releases, shutdowns and forced power reductions, and the number of personnel and Man/Rem exposure by work and job function

  7. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  8. Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323)

    International Nuclear Information System (INIS)

    1984-07-01

    Supplement 27 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for a license to operate Diablo Canyon Nuclear Power Plant, Unit 1 (Docket No. 50-275), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses the revisions to the license conditions and to the Technical Specifications as they relate to Amendment 10 to Diablo Canyon, Unit 1 Facility Operating License, DPR-76

  9. Technical evaluation of the electrical, instrumentation, and control design aspects of the proposed license amendment Revision 1 for single-loop operation of Browns Ferry Nuclear Plants (Docket No. 50-259, Unit 1; Docket No. 50-260, Unit 2; Docket No. 50-296, Unit 3)

    International Nuclear Information System (INIS)

    Donich, T.R.

    1983-01-01

    This report documents the technical evaluation of the proposed changes to the plant reactor protection system by the licensee of Browns Ferry Nuclear Power Station, Units 1, 2, and 3, to account for single-loop plant operation. This evaluation is restricted to only the electrical, instrumentation and control design aspects of proposed changes to the plant technical specifications for single-loop operation beyond 24 hours. Conclusion is that the license amendment for single-loop operation has met the review criteria provided sufficient administrative controls are in effect, and any anomalous control room indicators are corrected or warning-tagged for the duration of single-loop operation

  10. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986

  11. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    International Nuclear Information System (INIS)

    Mellor, S.P.; Matthee, F.W.

    2002-01-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  12. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Energy Technology Data Exchange (ETDEWEB)

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  13. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391

    International Nuclear Information System (INIS)

    1992-01-01

    Supplement No. 8 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 7 was issued, and (2) matters that the staff had under review when Supplement No. 7 was issued

  14. Safety Evaluation Report, related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1983-11-01

    Supplement No. 3 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  15. Safety Evaluation Report related to the operation of Byron Station, Units 1 and 2 (Docket Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1984-05-01

    Supplement No. 4 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  16. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  17. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  18. Continuous operation of NPP Kori Unit 1 - Fireproof paint for cables

    International Nuclear Information System (INIS)

    Wendt, Dipl-Ing. Ruediger; Kim, Duill; Sik, Cho Hong

    2008-01-01

    Fireproof cable coating materials have been used in European NPP, especially in Germany, Russia, Ukraine, Czech Republic, Lithuania, Switzerland. Wide experiences were made during operation while applying these systems. In NPP Kori, Unit 1, a fire proof cable coating project was realised for the first time in a NPP of KHNP. The scope of services of the cable trays to coat amounts to 15,587m 2 . In different fire compartments and rooms the cables should be coated partially respectively completely with the fire proof cable coating system. The extent of cable surfaces to coat was stipulated by KHNP on the basis of an analysis made by KHNP. The project was tendered on the basis of a technical specification of KHNP. The specification is mainly predicted on Korean and US standards. The most important criteria for the fire proof cable coating is resumed as follows: The fireproof cable coating has to assure the fire protection of the cables for a period defined and for operational conditions defined in such a manner that the general conditions for the operation of the cable installation will not be affected

  19. 78 FR 49305 - Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2013-08-13

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-445 and 50-446; NRC-2013-0182] Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2; Application for Amendment to Facility... Operating License Nos. NPF-87 and NPF-89 for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2...

  20. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  1. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Science.gov (United States)

    2011-04-29

    ... Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice of Issuance of Renewed... Company (licensee), the operator of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (PVNGS... Plants: Supplement 43, Regarding Palo Verde Nuclear Generating Station,'' issued January 2011, discusses...

  2. 100-HR-2 Operable Unit Focused Feasibility study report

    International Nuclear Information System (INIS)

    1995-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Feasibility Study (FS) includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study (FFS) was conducted for the 100-HR-2 Operable Unit (OU) at the Hanford Site in southeastern Washington. This FFS constitutes the Phase 3 portion of the FS process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The objective of this OU-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the seven IRM candidate sites associated with the 100-HR-2 OU. The IRM candidate waste sites identified in Table ES-1 are determined in the limited field investigation (DOE-RL 1994b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented. A summary for the 100-HR-2 IRM candidate waste site is as follows: none of the waste sites require additional alternative development. six of the seven waste sites directly plug into the waste site group alternatives. The site-specific detailed analysis is conducted, referencing the waste site group analysis as appropriate. A waste site detailed analysis summary is presented in Table ES-1.A comparative analysis of remedial alternatives is presented for each waste site. A summary of the comparative analysis is presented in Table ES-2

  3. Hazard classification for the 200-ZP-1 Operable Unit Phase 2 and 3 interim remedial measure

    International Nuclear Information System (INIS)

    Oestreich, D.K.

    1996-04-01

    This safety assessment documents the Final Hazard Classification (FHC) for Phase 2 and 3 interim remedial measure (IRM) activities to be conducted in the 200 West Area of the Hanford Site. The 200-ZP-1 Phase 2 and 3 IRM activities will involve the air stripping of carbon tetrachloride (CCl 4 ) from extracted groundwater using a packed-bed stripper column followed by gas-phase adsorption of the CCl 4 from the stripper off-gas onto a granular activated carbon (GAC) bed. The stripper is designed to be operated at a feedwater flow rate of up to 1,893 L/min (500 gal/min) and to remove 13.6 kg/day (30.0 lb/day) of CCl 4 . For Phase 2, which includes the initial year of operation, it is planned to operate the stripper at 568 L/min (150 gal/min). The process flow diagram for the Phase 2 and 3 system is shown

  4. Safety-evaluation report related to the operation of Diablo Canyon Nuclear Power Plants, Units 1 and 2. Docket Nos. 50-275 and 50-323. Supplement No. 18

    International Nuclear Information System (INIS)

    1983-08-01

    Supplement 18 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plants, Units 1 and 2 (Docket Nos. 50-275 and 50-323), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports on the verification effort for Diablo Canyon Unit 1 that was performed between November 1981 and the present in response to Commission Order CLI-81-30 and an NRC letter to the licensee

  5. Draft environmental impact statement. New England Power Units 1 and 2 (NEP 1 and 2)

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Construction of New England Power Company Units 1 and 2 on 120 acres of 604-acre site near Block Island South in Charlestown, Rhode Island is proposed. Each unit would employ a pressurized water reactor to drive a steam turbine generator with a power rating of 1194 megawatts (MWe) of electric power capacity and a net output of 1150 MWe. A once-through flow of water obtained from and discharged into Block Island South at a rate of 1907 cubic feet per second would cool the units' exhaust steam. The station would transmit power through a 6700-foot, 345-kilovolt (kV) transmission line extending underground to the planned Charlestown substation, thence through a total of 70.5 miles of aboveground 345-kV line to the applicant's transmission system. The station would provide area consumers with a 2300-MWe base-load capacity and supply 14 billion kilowatt-hours annually during a 30-year operating life. Construction of the units would generate a total of $640 million in wages, plant operation would employ 250 persons with total wages of $8.4 million annually, and the applicant would contribute 90% of the Charlestown local tax base. Construction activities would cover 350 acres of land, and transmission line rights-of-way would require 1754 acres, including 1300 acres of forestland. Plant structures would mar the landscape, and the cooling system would contribute thermal pollution and some chemical pollutants to the Block Island Sound. Intermittent use of explosives would occur during an eight-to-ten-month period. Entrainment of fish in the cooling system could significantly reduce populations of tautog and cunner in the Block Island Sound

  6. Audit Calculations of LBLOCA for Ulchin Unit 1 and 2 Power Up rate

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Donggu; Huh, Byunggil; Yoo, Seunghunl; Yang, Chaeyong; Seul, Kwangwon [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-05-15

    The KINS-Realistic Evaluation Model (KINS-REM) was developed for the independent audit calculation in 1991, and the code accuracy and statistical method have been improved. To support the licensing review and to confirm the validity of licensee's calculation, regulatory auditing calculations have been also conducted. Currently, the modification of Ulchin 1 and 2 operating license for 4.5% power up rate is under review. In this study, the regulatory audit calculation for LBLOCA of Ulchin Unit 1 and 2 with 4.5% power up rate was performed by applying KINS-REM. In this study, the regulatory audit calculation for LBLOCA of Ulchin Unit 1 and 2 with 4.5% power up rate was performed by applying KINS-REM. It is confirmed that the analysis results of LBLOCA for Ulchin 1 and 2 power up rate meets the PCT acceptance criteria.

  7. Safety Evaluation Report related to the operation of Byron Station, Units 1 and 2 (Dockets Nos. STN 50-454 and STN 50-455)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 5 to the Safety Evaluation Report related to Commonwealth Edison Company's application for licenses to operate the Byron Station, Units 1 and 2, located in Rockvale Township, Ogle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report. Because of the favorable resolution of the items discussed in this report, the staff concludes that there is reasonable assurance that the facility can be operated by the applicant without endangering the health and safety of the public

  8. 75 FR 43572 - Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2; Environmental Assessment and...

    Science.gov (United States)

    2010-07-26

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-369 and 50-370; NRC-2010-0259] Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2; Environmental Assessment and Finding of No Significant... Energy Carolinas, LLC (the licensee), for operation of the McGuire Nuclear Station, Units 1 and 2...

  9. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  10. Limited field investigation report for the 100-NR-1 Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-NR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land-use scenarios. This report is unique in that it is based on Hanford-specific agreements discussed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992), the Hanford Site Risk Assessment Methodology (DOE-RL 1994a), the Remedial Investigation Feasibility Study Work Plan for the 100-NR-1 Operable Unit (DOE-RL 1992a), and the Hanford Past-Practice Strategy (HPPS) (DOE-RL 1991), and must be viewed in this context. The HPPS emphasizes initiating and completing waste site cleanup through interim actions. The strategy includes paths for interim decision-making and a final remedy-selection process for the operable unit. A LFI report is required, in accordance with the HPPS, when waste sites are to be considered for IRM and existing data are insufficient to formulate a conceptual model or perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify potential contaminant- and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose a risk to human health or the environment that warrants action through IRM

  11. Qualitative risk assessment for the 100-FR-1 source operable unit

    International Nuclear Information System (INIS)

    Corporation, I.T.

    1994-08-01

    This report provides the Qualitative risk assessment (QRA) for the waste sites associated with the 100-FR-1 Operable Unit. The QRA is an evaluation of risk for a predefined set of human and ecological exposure scenarios. It is not intended to replace or be a substitute for a baseline risk assessment. The QRA is streamlined to consider only two human health scenarios (frequent-and occasional-use) with four exposure pathways (soil ingestion, fugitive dust inhalation, inhalation of volatile organics, and external radiation exposure) and a limited ecological evaluation. The use of these scenarios and pathways was agreed to by the 100 Area Tri-Party unit managers

  12. Safety evaluation report related to the operation of Midland Plant, Units 1 and 2. Docket Nos. 50-329 and 50-330, Consumers Power Company

    International Nuclear Information System (INIS)

    1982-05-01

    The Safety Evaluation Report for the application filed by the Consumers Power Company, as applicant and owner, for a license to operate the Midland Plant Units 1 and 2 (Docket Nos. 50-329 and 50-330), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near the city of Midland in Midland County, Michigan. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  13. Emergency operating instruction improvements at San Onofre Nuclear Generating Station Units 2 and 3

    International Nuclear Information System (INIS)

    Trillo, M.W.; Smith, B.H.

    1989-01-01

    In late 1987, San Onofre nuclear generating station (SONGS) began an extensive upgrade of the units 2 and 3 emergency operating instructions (EOIs). The original intent of this program was to incorporate revised generic guidance and to correct problems that were identified by operators. While this program was in progress, the US Nuclear Regulatory Commission (NRC) conducted a series of audits of emergency operating procedure (EOP) development and maintenance programs as 16 commercial nuclear facilities in the United States. These audits included four stations with Combustion Engineering-designed nuclear steam supply systems. (One of these audits included a review of preupgrade SONGS units 2 and 3 EOIs.) Significant industrywide comments resulted from these audits. The NRC has stated its intent to continue the review and audit of EOIs and the associated maintenance programs at all US commercial nuclear facilities. The units 2 and 3 EOI upgrade program developed procedural improvements and procedural program maintenance improvements that address many of the existing audit comments that have been received by the industry. Other resulting improvements may be useful in minimizing NRC comments in future such audits. Specific improvements are discussed. The upgrade program resulted in benefits that were not originally anticipated. The results of this program can be of significant use by other utilities in addressing the industrywide concerns that have been raised in recent NRC audits of EOP development and maintenance programs

  14. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    CERN Document Server

    Ferlin, G; Claudet, S; Pezzetti, M

    2015-01-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  15. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    Science.gov (United States)

    Ferlin, G.; Tavian, L.; Claudet, S.; Pezzetti, M.

    2015-12-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  16. Safety evaluation report related to the operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket Nos. 50-327 and 50-328, Tennessee Valley Authority. Supplement No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-01-01

    On September 17, 1980, the Nuclear Regulatory Commission (NRC) issued the facility operating license DPR-77 to the Tennessee Valley Authority for the Sequoyah Nuclear Plant, Unit 1, located in Hamilton County, Tennessee. The license authorized operation of Unit 1 at 100 percent power; however, a license condition regarding the adequacy of the hydrogen control system was included that required resolution by January 31, 1981. The purpose of Supplement No. 4 to the SER is to further update our Safety Evaluation Reports on the hydrogen control measures (Section 22.2, II.B.7), and to comply with the license condition which is as follows: 'By January 31, 1981, TVA shall by testing and analysis show to the satisfaction of the NRC staff that an interim hydrogen control system will provide with reasonable assurance protection against breach of containment in the event that a substantial quantity of hydrogen is generated.' TVA submitted on December 11, 1980, the first quarterly report on the research program for hydrogen control. Also, TVA revised volume 2 of the Sequoyah Core Degradation Program Report to incorporate additional information on the overall program. Section II.B.7 of Supplement No. 4 responds to the license condition. Each section is supplementary to and not in lieu of discussion in the Safety Evaluation Report and Supplements Nos. 1, 2, and 3, except where specifically noted. Supplements No. 2 and 3 to the Safety Evaluation Report provided a basis for concluding that the full-power licensing of Sequoyah Unit 1 need not await completion of ongoing work on hydrogen control measures. This supplement concludes that operation of the IDIS for an interim period of one year is appropriate.

  17. Safety evaluation report related to the operation of Midland Plant, Units 1 and 2. Docket Nos. 50-329 and 50-330. Consumers Power Company

    International Nuclear Information System (INIS)

    1982-06-01

    This report supplements the Safety Evaluation Report, NUREG-0793, issued with respect to the application filed for licenses to operate the Midland Plant, Units 1 and 2 (Docket Nos. 50-329 and 50-330). This supplement provides recent information regarding resolution of some of the open items identified in the Safety Evaluation Report and discusses recommendations of the Advisory Committee on Reactor Safeguards in its interim report dated June 8, 1982

  18. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1992-09-01

    This document supplement 25 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, and 24 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several Unit 1 licensing items resolved since Supplement 24 was issued

  19. Evaluation of potential severe accidents during Low Power and Shutdown Operations at Grand Gulf, Unit 1. Volume 2, Part 1B: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage, Main report (Section 10)

    International Nuclear Information System (INIS)

    Whitehead, D.; Darby, J.; Yakle, J.

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power performed on Grand Gulf. This document, Volume 2, Part 1B, presents chapters Section 10 of this report, Human Reliability Analysis

  20. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  1. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  2. Safety Evaluation Report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1988-03-01

    In April 1986 the staff of the US Nuclear Regulartory Commission issued its Safety Evaluation Report (NURED-0781) regarding the application of Houston Lighting and Power Companany (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facililty is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, the third supplement in May 1987, and the fourth supplement in July 1987. This fifth supplement provides updated information on the issues that had been considered previously as well as the evaluation of issues that have arisen since the fourth supplement was issued. The evaluation resolves all the issues necessary to support the issuance of a full-power license for Unit 1

  3. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1985-06-01

    The Safety Evaluation Report for the application filed by Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, as applicants and owners, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Burke County, Georgia, approximately 41.5 km (26 mi) south-southeast of Augusta, and on the Savannah River. Subject to favorable resolution of the items discussed in this report, the staff concludes that the applicant can operate the facility without endangering the health and safety of the public

  4. Safety Evaluation Report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). Supplement No. 1

    International Nuclear Information System (INIS)

    1986-09-01

    In April 1986 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. This first supplement to NUREG-0781 reports the status of certain items that remained unresolved at the time the Safety Evaluation Report was published

  5. Operation of Grand Gulf Nuclear Station, Units 1 and 2, Dockets Nos. 50-416 and 50-417: Mississippi Power and Light Company, Middle South Energy, Inc., South Mississippi Electric Power Association. Final environmental statement

    International Nuclear Information System (INIS)

    1981-09-01

    The information in this Final Environmental Statement is the second assessment of the environmental impacts associated with the construction and operation of the Grand Gulf Nuclear Station, Units 1 and 2, located on the Mississippi River in Claiborne County, Mississippi. The Draft Environmental Statement was issued in May 1981. The first assessment was the Final Environmental Statement related to construction, which was issued in August 1973 prior to issuance of the Grand Gulf Nuclear Station construction permits. In September 1981 Grand Gulf Unit 1 was 92% complete and Unit 2 was 22% complete. Fuel loading for Unit 1 is scheduled for December 1981. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the Station, and includes the staff responses to comments on the Draft Environmental Statement

  6. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  7. Final environmental statement related to the operation of Midland Plant, Units 1 and 2. Docket Nos. 50-329 and 50-330, Consumers Power Company

    International Nuclear Information System (INIS)

    1982-07-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of the Midland Plant, Units 1 and 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the purpose and need for the Midland project, alternatives to the project, the affected environment, environment consequences and mitigating actions, and environmental and economic benefits and costs

  8. Data compilation task report for the source investigation of the 300-FF-1 operable unit phase 1 remedial investigation

    International Nuclear Information System (INIS)

    Young, J.S.; Fruland, R.M.; Fruchter, J.S.

    1990-02-01

    This report provides additional information on facility and waste characteristics for the 300-FF-1 operable unit. The additional information gathered and reported includes meetings and on-site visits with current and past personnel having knowledge of operations in the operable unit, a more precise determination of the location of the Process Sewer lines and Retired Radioactive Liquid Waste Sewer, a better understanding of the phosphoric acid spill at the 340 Complex, and a search for engineering plans and environmental reports related to the operable unit. As a result of this data-gathering effort, recommendations for further investigation include characterization of the 307 Trenches to determine the origin of an underlying uranium plume in the groundwater, more extensive sampling of near-surface and dike sediments in the North and South Process Ponds to better define the extent of horizontal contamination, and detection of possible leaks in the abandoned Radioactive Waste Sewer by either electromagnetic induction or remote television camera inspection techniques. 16 refs., 4 figs., 5 tabs

  9. 75 FR 8149 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-02-23

    ...] Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3... NPF-74, issued to the Arizona Public Service Company (APS, or the licensee), for operation of the Palo Verde Nuclear Generating Station (PVNGS, the facility), Units 1, 2, and 3, respectively, located in...

  10. 76 FR 1469 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2011-01-10

    ... Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Environmental Assessment... Plant, LLC, the licensee, for operation of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2... Impact Statement for License Renewal of Nuclear Plants, Calvert Cliffs Nuclear Power Plant (NUREG-1437...

  11. Safety Evaluation Report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-04-01

    The Safety Evaluation Report for the application filed by Houston Lighting and Power Company, City Public Service Board of San Antonio, Central Power and Light Company, and the City of Austin, as applicants and owners, for licenses to operate the South Texas Project Units 1 and 2 (Docket Nos. 50-498 and 50-499) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. Subject to resolution of the items discussed in this report, the staff concludes that the applicant can operate the facility without endangering the health and safety of the public

  12. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Semiannual report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Browns Ferry units 1 and 2 operated at maximum power from January 1 to March 22 except as limited by thermal margins, fuel preconditioning, optimum power shape, maintenance, and Unit 2 start-up tests. On March 22 a cable tray fire started causing spurious starting of equipment due to faulted control cables. The reactors were manually scrammed and placed in cold shutdown for fire investigation, clean up, and fuel removal. Information is also presented concerning maintenance, radiochemistry, occupational radiation exposure, release of radioactive materials, and non-radiological environmental monitoring

  13. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  14. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1993-02-01

    Supplement 26 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, 24, and 25 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several licensing issues that relate to Unit 1, which have been resolved since Supplement 25 was issued

  15. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  16. Safety Evaluation Report related to the operation of Shearon Harris Nuclear Power Plant, Unit No. 1 (Docket No. STN 50-400). Supplement No. 2

    International Nuclear Information System (INIS)

    1985-06-01

    This report, Supplement No. 2 to the Safety Evaluation Report for the application filed by the Carolina Power and Light Company and North Carolina Eastern Municipal Power Agency (the applicants) for a license to operate the Shearon Harris Nuclear Power Plant Unit 1 (Docket No. 50-400), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement No. 1

  17. Commissioning tests at Bohunice NPP V1 unit 2 after reconstruction in 1998

    International Nuclear Information System (INIS)

    Pajtinka, A.; Tvaroska, V.; Wiening, K.-H.; Mueller, B.

    2000-01-01

    The last and the most extensive stage in the reconstruction project of the Bohunice NPP started in July 1998. The main activities performed during a 6-month scheduled unit 2 outage included: - Installation of a new emergency core cooling system with an increased capacity according to the defined broader break spectrum for LOCA; - Reconstruction of the existing confinement spray system and installation of a new confinement pressure suppression system; - Completion of upgrading measures to increase the reliability of emergency power supply systems (replacement of low voltage switchgear, installation of new cabling for all loads important to safety, installation of new motor-generators and rectifier sets); - Connection to the plant and commissioning of the new reactor protection system. Comprehensive tests and checks performed on completion of installation work on the modified mechanical, electrical and I and C systems were important reasons for the absence of major problems during restart of the unit after the several project implementation phases. Operating experience at unit 2 since its recommissioning in January 1999 has confirmed that the required safety standards have been met and that operational reliability has been substantially increased at the sometime. Periodic testing is being performed in accordance with the limits and conditions for safe operation of Bohunice NPP. To date all these tests were completed without significant problems. The functions implemented in the new technology met the test program criteria, which were approved with authority, in all essential areas. Through the close cooperation of the partners involved and through the combined efforts of the various engineering and operating disciplines, technical and scheduling problems could be immediately identified and quickly resolved. In general, these kinds of projects require optimum cooperation among the parties involved. Modernization of the NPP Bohunice V1 unit 2 has shown, that all

  18. Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Spane, Frank A.

    2010-09-08

    CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

  19. Calculation of the real states of Ignalina NPP Unit 1 and Unit 2 RBMK-1500 reactors in the verification process of QUABOX/CUBBOX code

    International Nuclear Information System (INIS)

    Bubelis, E.; Pabarcius, R.; Demcenko, M.

    2001-01-01

    Calculations of the main neutron-physical characteristics of RBMK-1500 reactors of Ignalina NPP Unit 1 and Unit 2 were performed, taking real reactor core states as the basis for these calculations. Comparison of the calculation results, obtained using QUABOX/CUBBOX code, with experimental data and the calculation results, obtained using STEPAN code, showed that all the main neutron-physical characteristics of the reactors of Unit 1 and Unit 2 of Ignalina NPP are in the safe deviation range of die analyzed parameters, and that reactors of Ignalina NPP, during the process of the reactor core composition change, are operated in a safe and stable manner. (author)

  20. Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323)

    International Nuclear Information System (INIS)

    1984-02-01

    Supplement 17 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plants, Units 1 and 2 (Docket Nos. 50-275 and 50-323) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and the previous supplements

  1. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50--390 and 50--391)

    International Nuclear Information System (INIS)

    1990-11-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), and Supplement No. 4 (March 1985), issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items and proposed license conditions identified in the SER

  2. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391)

    International Nuclear Information System (INIS)

    Tam, P.S.

    1991-04-01

    This report supplements the Safety Evaluation Report (SER), NUREG- 0847 (June 1982), Supplement No. 1' (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), and Supplement No. 5 (November 1990) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50--390 and 50--391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  3. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  4. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414. Suppl. 1

    International Nuclear Information System (INIS)

    1983-04-01

    This reort supplements the Safety Evaluation Report (NUREG-0954) issued in February 1983 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414, respectively). The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. This supplement provides more recent information regarding resolution or updating of some of the open and confirmatory items and license conditions identified in the Safety Evaluation Report, and discusses the recommendations of the Advisory Committee on Reactor Safeguards in its report dated March 15, 1983

  5. Conformance to Generic Letter 83-28, Items 3.1.3 and 3.2.3, Beaver Valley, Unit No. 1, North Anna, Unit Nos. 1 and 2, Surry Unit Nos. 1 and 2 (Docket Nos. 50-334, 50-338, 50-339, 50-280, and 50-281)

    International Nuclear Information System (INIS)

    Haroldsen, R.

    1985-09-01

    This report provides a review of the submittals for Beaver Valley, Unit No. 1, North Anna, Unit Nos. 1 and 2, and Surry, Unit Nos. 1 and 2, for conformance to Generic Letter 83-28, Items 3.1.3 and 3.2.3. The specific plants selected were reviewed as a group because of similarity in type and applicability of review items

  6. Computation code TEP 1 for automated evaluation of technical and economic parameters of operation of WWER-440 nuclear power plant units

    International Nuclear Information System (INIS)

    Zadrazil, J.; Cvan, M.; Strimelsky, V.

    1987-01-01

    The TEP 1 program is used for automated evaluation of the technical and economic parameters of nuclear power plant units with WWER-440 reactors. This is an application program developed by the Research Institute for Nuclear Power Plants in Jaslovske Bohunice for the KOMPLEX-URAN 2M information system, delivered by the USSR to the V-2 nuclear power plants in Jaslovske Bohunice and in Dukovany. The TEP 1 program is written in FORTRAN IV and its operation has two parts. First the evaluation of technical and economic parameters of operation for a calculation interval of 10 mins and second, the control of the calculation procedure, follow-up on input data, determination of technical and economic parameters for a lengthy time interval, and data printout and storage. The TEP 1 program was tested at the first unit of the V-2 power plant and no serious faults appeared in the process of the evaluation of technical and economic parameters. A modification of the TEP 1 programme for the Dukovany nuclear power plant is now being tested on the first unit of the plant. (Z.M.)

  7. Safety Evaluation Report related to the operation of Seabrook Station, Units 1 and 2 (Docket Nos. 50-443 and 50-444). Supplement No. 5

    International Nuclear Information System (INIS)

    1986-07-01

    This report is Supplement No. 5 to the Safety Evaluation Report (NUREG-0896, March 1983) for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 Docket Nos. STN 50-443 and STN 50-444). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and provides recent information on open items identified in the SER. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  8. Limited field investigation report for the 100-KR-4 Operable Unit

    International Nuclear Information System (INIS)

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated

  9. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  10. Retrofitting and operation solid radwaste system Dresden Station, Units 2 and 3

    International Nuclear Information System (INIS)

    Testa, J.; Homer, J.C.

    1982-01-01

    Units 2 and 3 at Dresden Station are twin 794 MW (net) BWR units that became operational in 1970 and 1971. The waste streams are typical of BWR stations, namely, bead resin and filter sludge (powdered resins and diatomaceous earth), evaporator concentrate containing approximately 25% dissolved solids and dry active waste. The original solid radwaste system utilized cement for solidification in open top 55 gallon drums. Remote handling was provided by means of a monorail with moving platforms supporting the drums. A relatively light-weight compactor was used to compact DAW into 55 gallon drums. Difficulties were experienced with this system

  11. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446). Supplement No. 9

    International Nuclear Information System (INIS)

    1985-03-01

    This supplement addresses TUEC's analyses in support of its request to amend the Comanche Peak Final Safety Analysis Report to eliminate the commitment that coatings inside the reactor Containment Building be qualified for Units 1 and 2. In addition, this supplement provides the results of the staff's evaluation and resolution of 62 technical concerns and allegations in the coatings area for Unit 1. Because of the favorable resolution of the items discussed in this report, the staff concludes for the issues considered herein, that there is reasonable assurance that the facility can be operated by TUEC without endangering the health and safety of the public

  12. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  13. Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323)

    International Nuclear Information System (INIS)

    1984-06-01

    Supplement 23 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plants, Units 1 and 2 (Docket Nos. 50-275 and 50-323) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses the applicant's requests for approval of 22 deviations from the requirements of Section III.G of Appendix R of Title 10 of the Code of Federal Regulations Part 50

  14. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  15. Safety evaluation report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323). Supplement No. 25

    International Nuclear Information System (INIS)

    1984-07-01

    Supplement 25 to the Safety Evaluation Report for Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plants, Unit 1 and Unit 2 (Docket Nos. 50-275 and 50-323) has been prepared by the Office of Nuclear Reactor Regulation (NRR) of the US Nuclear Regulatory Commission. This supplement reports on the staff's inspection and evaluation efforts on the matter of piping and piping supports as related to the seven technical license conditions in an Order Modifying License issued by NRR on April 18, 1984

  16. Operable Unit 1 remedial investigation report, Eielson Air Force Base, Alaska

    International Nuclear Information System (INIS)

    Gilmore, T.J.; Fruland, R.M.; Liikala, T.L.

    1994-06-01

    This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT

  17. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2. Docket Nos. 50-445 and 50-446

    International Nuclear Information System (INIS)

    1983-03-01

    Supplement No. 3 to the Safety Evaluation Report (SER) related to the operation of the Comanche Peak Steam electric Station, Units 1 and 2, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. the facility is located in Somervell County, Texas. Subject to favorable resolution of the items identified in this supplement, the staff concludes that the facility can be operated by the applicatn without endangering the health and safety of the public. This document provides the NRC staff's evaluation of the outstanding and confirmatory issues that have been resolved since Supplement No. 2 was issued in January 1982, and addresses changes to the SER and its earlier supplements which have resulted from the receipt of additonal information from the applicant during the period of January throught October 1982

  18. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2, (Docket Nos. 50-440 and 50-441)

    International Nuclear Information System (INIS)

    1984-02-01

    Supplement No. 4 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1, 2 and 3 to that report

  19. Safety evaluation report related to the operation of Perry Nuclear Power Plant, Units 1 and 2: Docket Nos. 50-440 and 50-441

    International Nuclear Information System (INIS)

    1983-01-01

    Supplement No. 2 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group (CAPCO)), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement No. 1 to that report

  20. Safety evaluation report related to the operation of Perry Nuclear Power Plant, Units 1 and 2. Docket Nos. 50-440 and 50-441

    International Nuclear Information System (INIS)

    1983-04-01

    Supplement No. 3 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440/441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 and 2 to that report

  1. Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323). Supplement No. 33

    International Nuclear Information System (INIS)

    1986-05-01

    Supplement 33 to the Safety Evaluation Report for the Pacific Gas and Electric Company's Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323) has been prepared jointly by the Office of Nuclear Reactor Regulation and the Region V Office of the US Nuclear Regulatory Commission. The supplement reports on the status of the staff's investigation, inspection, and evaluation of allegations and concerns that have been identified to the NRC through March 1986. The report includes a complete listing of all allegations and concerns, indicating the status of their resolution. The NRC staff concludes that the technical issues raised in the allegations with regard to the design, construction, and safe operation of Diablo Canyon Units 1 and 2 have been satisfactorily resolved and no further action is required

  2. Safety evaluation report related to the operation of South Texas Project, Unit 2 (Docket No. 50-499)

    International Nuclear Information System (INIS)

    1989-03-01

    In April 1986 the staff of the US Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, the third supplement in May 1987, the fourth supplement in July 1987, the fifth supplement in March 1988, and the sixth supplement in January 1989. This seventh supplement, which supports the issuance of a full-power license for Unit 2, provides updated information on the issues that had been considered previously as well as the evaluation of issues that have arisen since the sixth supplement was issued. The evaluation resolves all the issues necessary to support the issuance of a full-power license for Unit 2. 2 refs., 2 figs., 1 tab

  3. Safety evaluation report related to the operation of Shearon Harris Nuclear Power Plant, Units 1 and 2. Docket Nos. STN 50-400 and STN 50-401

    International Nuclear Information System (INIS)

    1983-11-01

    The Safety Evaluation Report for the application filed by the Carolina Power and Light Company, as applicant and owner, for licenses to operate the Shearon Harris Nuclear Power Plant Units 1 and 2 (Docket Nos. 50-400 and 50-401) has been prepared by the Office of Nuclear Reactor Regulation of US Nuclear Regulatory Commission. The facility is located near Raleigh, North Carolina. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  4. 26 CFR 1.953-2 - Actual United States risks.

    Science.gov (United States)

    2010-04-01

    ... being the promotion of such sales to United States retail outlets by advertising in trade publications... 26 Internal Revenue 10 2010-04-01 2010-04-01 false Actual United States risks. 1.953-2 Section 1.953-2 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX...

  5. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391): Supplement No. 19

    International Nuclear Information System (INIS)

    1995-11-01

    Supplement No. 19 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation with (1) additional information submitted by the applicant since Supplement No. 18 was issued, and (2) matters that the staff had under review when Supplement No. 18 was issued

  6. Second periodic safety review of Angra Nuclear Power Station, unit 1

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M., E-mail: ottoncf@tecnatom.com.br, E-mail: emfreire46@gmail.com, E-mail: robcrepaldi@hotmail.com [Tecnatom do Brasil Engenharia e Servicos Ltda, Rio de Janeiro, RJ (Brazil); Campello, Sergio A., E-mail: sacampe@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  7. Second periodic safety review of Angra Nuclear Power Station, unit 1

    International Nuclear Information System (INIS)

    Martins, Carlos F.O.; Crepaldi, Roberto; Freire, Enio M.; Campello, Sergio A.

    2015-01-01

    This paper describes the second Periodic Safety Review (PSR2-A1) of Angra Nuclear Power Station, Unit 1, prepared by Eletrobras Eletronuclear S.A. and Tecnatom do Brasil Engenharia e Servicos Ltda., during Jul.2013-Aug.2014, covering the period of 2004-2013. The site, in Angra dos Reis-RJ, Brazil, comprises: Unit 1, (640 MWe, Westinghouse PWR, operating), Unit 2 (1300 MWe, KWU/Areva, operating) and Unit 3 (1405 MWe, KWU/Areva, construction). The PSR2-A1 attends the Standards 1.26-Safety in Operation of Nuclear Power Plants, Brazilian Nuclear Regulatory Commission (CNEN), and IAEA.SSG.25-Periodic Safety Review of Nuclear Power Plants. Within 18 months after each 10 years operation, the operating organization shall perform a plant safety review, to investigate the evolution consequences of safety code and standards, regarding: Plant design; structure, systems and components behavior; equipment qualification; plant ageing management; deterministic and probabilistic safety analysis; risk analysis; safety performance; operating experience; organization and administration; procedures; human factors; emergency planning; radiation protection and environmental radiological impacts. The Review included 6 Areas and 14 Safety Parameters, covered by 33 Evaluations.After document evaluations and discussions with plant staff, it was generated one General and 33 Specific Guide Procedures, 33 Specific and one Final Report, including: Description, Strengths, Deficiencies, Areas for Improvement and Conclusions. An Action Plan was prepared by Electronuclear for the recommendations. It was concluded that the Unit was operated within safety standards and will attend its designed operational lifetime, including possible life extensions. The Final Report was submitted to CNEN, as one requisite for renewal of the Unit Permanent Operation License. (author)

  8. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  9. Geophysical Investigation of the 618-10 and 618-11 Burial Grounds, 300-FF-2 Operable Unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Bolin, D.J.; Mitchell, T.H.

    1997-09-01

    This document summarizes the results of geophysical investigations conducted at two radioactive solid waste burial grounds, 618-10 and 618-11. The burial grounds are located approximately 4.5 miles and 7 miles north of the 300 Area, respectively. These sites are within the 300-FF-2 Operable Unit, where geophysical techniques are being used to characterize the distribution of solid waste in the subsurface as part of the Limited Field Investigations for this operable unit

  10. Safety evaluation report related to the operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket Nos. 50-327 and 50-328, Tennessee Valley Authority

    International Nuclear Information System (INIS)

    1982-12-01

    Supplement No. 6 to the Safety Evaluation Report (SER) related to the operation of the Tennessee Valley Authority's Sequoyah Nuclear Plant, Units 1 and 2, located in Hamilton County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The purpose of this supplement is to update the staff's evaluations of the issues related to the hydrogen mitigation system identified in the SER and previous supplements as needing resolution

  11. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement No. 2

    International Nuclear Information System (INIS)

    1986-05-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, for a license to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This second supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued. This supplement also discusses some new open and confirmatory items

  12. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  13. Peach Bottom Atomic Power Station, Units 2 and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 2 experienced 11 forced outages, 5 power reductions, and one major refueling outage which lasted about 3 months during which time the feedwater spargers were replaced. Net electrical power generated was 5,569,633 MWH with the generator on line 5,998 hrs. Unit 3 experienced 17 forced outages, 11 power reductions and 2 major outages. The first refueling outage began 12/24/77. Net electrical power generated was 6,049,644 MWH with the unit on line 6,829 hrs. Information is presented concerning operations, personnel exposures, radioactive releases, maintenance, and irradiated fuel examination

  14. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Numbers 50-390 and 50-391)

    International Nuclear Information System (INIS)

    1994-04-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), and Supplement No. 12 (October 1993), issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER. These issues relate to: Design criteria -- structures, components, equipment, and systems; Reactor; Instrumentation and controls; Electrical power systems; Auxiliary systems; Conduct of operations; Accident analysis; and Quality assurance

  15. Safety evaluation report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1986 staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986. This second supplement reports on the status of unresolved items in the Safety Evaluation Report and identifies certain additional items that have since been reviewed by the staff

  16. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  17. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  18. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 3: Internal Events Appendices I and J

    Energy Technology Data Exchange (ETDEWEB)

    Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Whitehead, D.; Staple, B. [Sandia National Labs., Albuquerque, NM (United States)

    1994-06-01

    This report provides supporting documentation for various tasks associated with the performance of the probablistic risk assessment for Plant Operational State 5 during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143.

  19. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 3: Internal Events Appendices I and J

    International Nuclear Information System (INIS)

    Yakle, J.; Darby, J.; Whitehead, D.; Staple, B.

    1994-06-01

    This report provides supporting documentation for various tasks associated with the performance of the probablistic risk assessment for Plant Operational State 5 during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143

  20. Safety evaluation report related to the operation of Wolf Creek Generating Staton, Unit No. 1, (Docket No. STN 50-482). Supplement No. 4

    International Nuclear Information System (INIS)

    1983-12-01

    Supplement No. 4 to the Safety Evaluation Report related to the operation of the Wolf Creek Generating Station, Unit No. 1 updates the information contained in the Safety Evaluation Report, dated April 1982 and Supplements 1, 2, and 3, dated August 1982, June 1983 and August, 1983, respectively. Supplement No. 4 addresses open issues, confirmatory items and addresses Board Notifications. The Safety Evaluation and its supplements pertain to the application for a license to operate the Wolf Creek Generating Station, Unit No. 1 filed by Kansas Gas and Electric Company on February 19, 1980. The Construction Permit No. CPPR-147 was issued on May 17, 1977

  1. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement No. 1

    International Nuclear Information System (INIS)

    1985-10-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, for a license to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This first supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued and provides the Advisory Committee on Reactor Safeguards letter dated August 13, 1985

  2. Safety evaluation report related to the operation of Susquehanna Steam Electric Station, Units 1 and 2. Docket Nos. 50-387 and 50-388, Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc

    International Nuclear Information System (INIS)

    1982-11-01

    In April 1981, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0776) regarding the application of the Pennsylvania Power and Light Company (the licensee) and the Allegheny Electric Cooperative, Inc. (co-licensee) for licenses to operate the Susquehanna Steam Electric Station, Units 1 and 2, located on a site in Luzerne County, Pennsylvania. Supplement 1, issued in June 1981, addressed outstanding issues. Supplement 2, issued in September 1981, contains the ACRS Report and responses. Supplement 3, issued in July 1982, contains the resolution to five items previously identified as open and closes them out. On July 17, 1982, License NPF-14 was issued to allow Unit 1 operation at power levels not to exceed 5% of rated power. This supplement discusses the resolution of several license conditions that have been met

  3. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1987-03-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). This sixth supplement of NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued. These areas are performance testing, reactor cooling hydraulics, loose parts monitoring, and electric power systems

  4. Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moran, James J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M.V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lawter, Amanda R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Resch, Charles T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gartman, Brandy N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhong, Lirong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nims, Megan K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Saunders, Danielle L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, Benjamin D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leavy, Ian I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baum, Steven R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Christiansen, Beren B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McElroy, Erin M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Appriou, Delphine [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tyrrell, Kimberly J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Striluk, Miranda L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-15

    A laboratory study was conducted to quantify contaminant attenuation processes and associated contaminant transport parameters that are needed to evaluate transport of contaminants through the vadose zone to the groundwater. The laboratory study information, in conjunction with transport analyses, can be used as input to evaluate the feasibility of Monitored Natural Attenuation and other remedies for the 200-DV-1 Operable Unit at the Hanford Site.

  5. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  6. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Dockets Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 11 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizone, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 10 was issued and (2) other matters requiring staff review since Supplenent No. 10 was issued, specifically those issues that required resolution before Unit 3 low-power licensing

  7. Remedial investigation report on Bear Creek Valley Operable Unit 2 (rust spoil area, spoil area 1, and SY-200 yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2. Appendixes

    International Nuclear Information System (INIS)

    1994-08-01

    This document contains the appendices to the Remedial Investigation Report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. The appendices include Current and historical soil boring and groundwater monitoring well information, well construction logs, and field change orders; Analytical data; Human health risk assessment data; and Data quality

  8. Remedial investigation report on Bear Creek Valley Operable Unit 2 (rust spoil area, spoil area 1, and SY-200 yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 2. Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document contains the appendices to the Remedial Investigation Report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. The appendices include Current and historical soil boring and groundwater monitoring well information, well construction logs, and field change orders; Analytical data; Human health risk assessment data; and Data quality.

  9. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1986-12-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-0737 was issued by the staff in October 1985, Supplement 2 was issued in May 1986, and Supplement 3 was issued in August 1986. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This fourth supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued. This supplement also discusses some new items

  10. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1987-01-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985, Supplement 2 was issued in May 1986, Supplement 3 was issued in August 1986, and Supplement 4 was issued in December 1986. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This fifth supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued

  11. Limited field investigation report for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-09-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses

  12. Final Environmental Statement related to the operation of Shearon Harris Nuclear Power Plant, Units 1 and 2 (Docket Nos. STN 50-400 and STN 50-401)

    International Nuclear Information System (INIS)

    1983-10-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Shoran Harris Nuclear Power Plant, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archaeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial. 19 figs., 21 tabs

  13. Safety Evaluation Report related to the operation of Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323). Supplement No. 28

    International Nuclear Information System (INIS)

    1985-04-01

    Supplement 28 to the Safety Evaluation Report for the Pacific Gas and Electric Company's application for licenses to operate Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-275 and 50-323) has been prepared jointly by the Office of Nuclear Reactor Regulation and the Region V Office of the US Nuclear Regulatory Commission. The supplement reports on the status of the staff's investigation, inspection, and evaluation of those allegations or concerns that have been identified to the NRC as of March 1, 1985

  14. Integrity Assessment of Essential Service Water System of Ulchin unit 1 and 2

    International Nuclear Information System (INIS)

    Lee, Sun Ki; Lee, Sang Kook; Jeong, Il Suk; Song, Taek Ho; Kwon, Jong Ju; Hong, Seong Yul; Lee, Jin Hwan

    2005-01-01

    Because of circulating water filtration system(CFI) and essential service water system(SEC) of Ulchin unit 1 and 2 were designed by commonness water intake structure, circulating water filtration system is managed by quality grade Q class. In this study, circulating water filtration system (CFI) examined revision possibility from present quality grade Q class to R class. It is proving that the operation of essential service water system (SEC) is always available regardless CFI conditions

  15. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414, Duke Power Company, et al

    International Nuclear Information System (INIS)

    1983-02-01

    The Safety Evaluation Report for the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Electric Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  16. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  17. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  18. Superfund record of decision (EPA Region 4): Marzone Inc. /Chevron Chemical Company Superfund Site, Operable Unit 1, Tifton, GA, September 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-30

    This decision document (Record of Decision) presents the selected remedial action for the Marzone, Inc./Chevron Chemical Company Site in Tift County, Georgia. EPA has organized the work at this Site into two phases or operable units (OUs). Operable Unit No. 1 involves contamination on the 1.68-acre former Marzone pesticide blending area, part of the Slack Property, and railroad drainage ditch past the southwest corner of the horse pasture, and contaminated groundwater related to the Site. This first operable unit is broken down into two separate remedies; one for groundwater and the other for soil.

  19. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 4

    International Nuclear Information System (INIS)

    1985-03-01

    This report supplements the Safety Evaluation Report, NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), and Supplement No. 3 (January 1985) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the open and confirmatory items and license conditions identified in the Safety Evaluation Report

  20. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 3

    International Nuclear Information System (INIS)

    1985-01-01

    This report supplements the Safety Evaluation Report, NUREG-0847 (June 1982), Supplement No. 1 (September 1982), and Supplement No. 2 (January 1984) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the open and confirmatory items and license conditions identified in the Safety Evaluation Report

  1. Unit 1 and Unit 2 Nuclear Power Plant Mochovce construction finishing from primary contractor of technological part. Skoda Praha a. s. point of view

    International Nuclear Information System (INIS)

    Horky, F.

    2000-01-01

    In this paper the history of delivery of technological part for NPP V-1 Mochovce as well as of reconstruction and safety improvements by the Skoda Praha a.s. is presented. Primary contractor of technological part Skoda Praha together with its final suppliers proved ability to realize under hard conditions such a complicated work what was indisputedly Units 1 and 2 finishing. Company proved capability to conform itself flexibly in the course of work to requirements of customer for realization of safety measures which means that Units 1 and 2 fully satisfy international standards. By fulfilment of primary contractor of technology obligations and above all by takeover of complex responsibility for both Units putting in operation including responsibility for 'past' Skoda Praha put away one of basic problems which occurred in decision making to whom will be assigned construction finishing contract. These facts fully qualify Skoda Praha to be selected for possible Units 3 and 4 construction finishing as one of chief construction finishing participant

  2. Safety assessment for the proposed pilot-scale treatability tests for the 200-UP-1 and 200-ZP-1 groundwater operable units. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    This safety assessment provides an analysis of the proposed pilot-scale treatability test activities to be and conducted within the 200 Area groundwater operable units on the Hanford Site. The 200-UP-1 and 200-ZP-1 operable units are located in the 200 West Area of the Hanford Site. These tests will evaluate an ion exchange (IX) water purification treatment system and granular activated carbon (GAC). A detailed engineering analysis of (GAC) adsorption for remediation of groundwater contamination. A detailed engineering analysis of the IX treatment system. The principal source of information for this assessment, states that the performance objective of the treatment systems is to remove 90% of the uranium and technetium-99 ( 99 Tc) from the extracted groundwater at the 200-UP-1 site. The performance objective for 200-ZP-1 is to remove 90% of the carbon tetrachloride (CCl 4 ), chloroform, and trichloroethylene (TCE) from the extracted groundwater

  3. Final environmental statement related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414, Duke Power Company, et al

    International Nuclear Information System (INIS)

    1983-01-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the Catawba Nuclear Station, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR 51, as amended, of the NRC regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic-ecological impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial

  4. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425)

    International Nuclear Information System (INIS)

    1989-03-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985, Supplement 2 was issued in May 1986, Supplement 3 was issued in August 1986, Supplement 4 was issued in December 1986, Supplement 5 was issued in January 1987, Supplement 6 was issued in March 1987, Supplement 7 was issued in January 1988, and Supplement 8 was issued in February 1989. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This ninth supplement to NUREG-1137 provides recent information regarding resolution of conditional items following issuance of Supplement 8

  5. Safety evaluation report: related to the operation of Seabrook Station, Units 1 and 2, Docket Nos. 50-443 and 50-444, Public Service Company of New Hampshire, et al

    International Nuclear Information System (INIS)

    1983-03-01

    The Safety Evaluation Report for the application filed by the Public Service Company of New Hampshire, et al., for licenses to operate Seabrook Station, Units 1 and 2 (Docket Nos. STN 50-443 and STN 50-444), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Seabrook, New Hampshire. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  6. Safety Evaluation report related to the operation of Braidwood Station, Units 1 and 2 (Docket Nos. STN 50-456 and STN 50-457)

    International Nuclear Information System (INIS)

    1987-07-01

    In November 1983, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1002) regarding the application filed by the Commonwealth Edison Company, as applicant and owner, for a license to operate Braidwood Station, Units 1 and 2 (Docket Nos. 50-456 and 50-457). The first supplement to NUREG-1002 was issued in September 1986; the second supplement to NUREG-1002 was issued in October 1986; the third supplement to NUREG-1002 was issued in May 1987. This fourth supplement to NUREG-1002 reports the status of certain items that remained unresolved at the time Supplement 3 was published. The facility is located in Reed Township, Will County, Illinois

  7. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  8. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  9. Safety Evaluation Report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1987-05-01

    This report, Supplement No. 5 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the applicant) for a license to operate the Beaver Valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved when the Safety Evaluation Report and its Supplements 1, 2, 3, and 4 were published

  10. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1987-03-01

    This report, Supplement No. 4 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the applicant) for a license to operate the Beaver Valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved when the Safety Evaluation Report and its Supplements 1, 2, and 3 were published

  11. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  12. Safety evaluation report related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1987-07-01

    In April 1986 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, and the third supplement in May 1987. This fourth supplement reports on the status of unresolved items in the Safety Evaluation Report and resolves all the issues necessary to support the issuance of a low-power license

  13. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1988-11-01

    Supplement 19 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the Texas Utilities Electric Company's (lead applicant's) corrective action program (CAP) related to equipment qualification. The scope and methodology for the CAP workscope, as summarized in Revision 0 to the Equipment Qualification Project Status Report and as detailed in related documents, were developed to resolve various issues raised by the Comanche Peak Response Team (CPRT) and the NRC staff to ensure that plant equipment is appropriately environmentally and/or seismically and dynamically qualified and documented in accordance with the validated plant design resulting from other CAP scopes of work for Unit 1 and areas common to Units 1 and 2. The staff concludes that the CAP workscope for equipment qualification provides a comprehensive program for resolving the concerns identified by the CPRT and the NRC staff, including issues raised in the Comanche Peak Safety Evaluation Report and its supplements, and its implementation will ensure that the environmental and/or seismic and dynamic qualification of equipment at CPSES satisfies the validated plant design and the applicable requirements of 10 CFR Part 50. As is routine staff practice, the NRC staff will verify the adequacy of implementation of the environmental and seismic and dynamic equipment qualification program at CPSES during inspections that will take place before fuel loading. 97 refs

  14. Limited field investigation report for the 100-HR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-08-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-HR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA) (WHC 1993a), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. A LFI Report is required, in accordance with the HPPS, when waste sites are to be considered for IRMs. The LFI is an integral part of the remedial investigation/feasibility study (RI/FS) or Resource Conservation and Recovery Act (RCRA) facility investigation/corrective measures study (RFI/CMS) and process and functions as a focused RI or RFI for selection of IRMs. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRMs, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify contaminant- and location-specific applicable or relevant and appropriate requirements (ARA), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose an unacceptable risk that warrants action through IRMs. The 100-HR-1 unit encompasses approximately 100 acres adjacent to the Columbia River shoreline. It contains waste units associated with the original plant facilities constructed to support the H Reactor. The area also contains evaporation basins which received liquid process wastes and nonroutine deposits of chemical wastes from the 300 Area, where fuel elements for the N Reactor were produced

  15. Operation of South Texas Project, Units 1 and 2 Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et.al., Matagorda County, Texas

    International Nuclear Information System (INIS)

    1986-08-01

    The final environmental impact statement (EPA No. 860376F) on a proposal to issue operating licenses for units 1 and 2 of the South Texas Project describes the two pressurized waters reactors that will produce 1250 MWe per unit. A closed-cycle will use water from the Colorado River for cooling. The site will include prime farmland. The study finds no significant effect on aquatic productivity of the river and no disruptions of the terrestrial biota. Economic benefits will include about 1800 new jobs, which will raise tax revenues and spur the local economy. Area marsh lands and wildlife habitat will suffer. The risk of exposure to accidental radiation is considered very low. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Licensing require the impact study

  16. Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530): Final environmental statement

    International Nuclear Information System (INIS)

    1982-02-01

    The proposed action is the issuance of operating licenses to the Arizona Public Service Company (APS, applicant) for the startup and operation of PVNGS, Units 1, 2, and 3, located in Maricopa County, about 24 km (15 mi) west of Buckeye, Arizona. The information in this statement represents the second assessment of the environmental impact associated with PVNGS Units 1, 2, and 3 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations (10 CFR) Part 51 of the Commissions's Regulations. After receiving an application in July 1974 to construct this station, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement/emdash/Construction Phase (FES-CP). After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Phoenix, Arizona, the US Nuclear Regulatory Commission issued Construction Permits Nos. CPPR-141, CPPR-142, and CPPR-143 for the construction of PVNGS Units 1, 2, and 3. As of September 1981, the construction of Unit 1 was about 92 percent complete, Unit 2 was 68 percent complete, and Unit 3 was 26 percent complete. 11 figs., 21 tabs

  17. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 14

    Energy Technology Data Exchange (ETDEWEB)

    Tam, P.S.

    1994-12-01

    Supplement No. 14 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation with additional information submitted by the applicant since Supplement No. 13 was issued, and matters that the staff had under review when Supplement No. 13 was issued.

  18. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1987-08-01

    This report, Supplement No. 6 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the licensee) for a license to operate the Beaver Valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved when the Safety Evaluation Report and its Supplements 1, 2, 3, 4, and 5 were published

  19. Geophysical investigation of the 116-H-1 liquid waste disposal trench, 100-HR-1 operable unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Mitchell, T.H.

    1996-04-01

    A geophysical investigation and data integration were conducted for the 116-H-1 Liquid Waste Disposal Trench, which is located in the 100-HR-1 Operable Unit. The 116-H-1 Liquid Waste Disposal Trench is also known as the 107-H Liquid Waste Disposal Trench, the 107-H Rupture Effluent Trench, and the 107-H Trench (Deford and Einan 1995). The trench was primarily used to hold effluent from the 107-H Retention Basin that had become radioactive from contact with ruptured fuel elements. The effluent may include debris from the ruptured fuel elements (Koop 1964). The 116-H-1 Liquid Waste Disposal Trench was also used to hold water and sludge from the 107-H Retention Basin during the basin's deactivation in 1965

  20. Safety Evaluation Report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417)

    International Nuclear Information System (INIS)

    1984-10-01

    This report supplements the Safety Evaluation Report (NUREG-0831) issued in September 1981 by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by Mississippi Power and Light (MP and L) Company, Middle South Energy, Inc., and South Mississippi Electric Power Association as applicants and owners, for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2 (Docket Nos. 50-416 and 50-417, respectively). The facility is located on the east bank of the Mississippi River near Port Gibson in Claiborne County, Mississippi. This supplement provides information on the NRC staff's evaluation of requests for exemptions to NRC regulations pursuant to the Commission's direction in CLI-84-19, dated October 25, 1984

  1. Study Improving Performance of Centrifugal Compressor In Paiton Coal Fired Power Plant Unit 1 And 2

    Science.gov (United States)

    Kusuma, Yuriadi; Permana, Dadang S.

    2018-03-01

    The compressed air system becomes part of a very important utility system in a Plant, including the Steam Power Plant. In PLN’S coal fired power plant, Paiton units 1 and 2, there are four Centrifugal air compressor types, which produce compressed air as much as 5.652 cfm and with electric power capacity of 1200 kW. Electricity consumption to operate centrifugal compressor is 7.104.117 kWh per year. This study aims to measure the performance of Centrifugal Compressors operating in Paiton’s coal fired power plant units 1 and 2. Performance Compressor is expressed by Specific Power Consumption (SPC) in kW/100 cfm. For this purpose, we measure the compressed air flow rate generated by each compressor and the power consumed by each compressor. The result is as follows Air Compressor SAC 2B : 15.1 kW/100 cfm, Air Compressor SAC 1B : 15.31 kW/100 cfm,Air Compressor SAC 1A : 16.3 kW/100 cfm and air Compressor SAC 2C : 18.19 kW/100 cfm. From the measurement result, air compressor SAC 2B has the best performance that is 15.1 kW / 100 cfm. In this study we analyze efforts to improve the performance of other compressors to at least match the performance of the SAC 2B air compressor. By increasing the Specific Power Consumption from others Compressor, it will get energy saving up to 284,165 kWh per year.

  2. Preparation for decommissioning of the Kozloduy Nuclear Power Plant units 1 and 2

    International Nuclear Information System (INIS)

    Delcheva, T.; Ribarski, V.; Demireva, E.

    2006-01-01

    The first decommissioning strategy of units 1 and 2 of Kozloduy NPP (KNPP) stipulated 3 phases: a 5 year phase including the post operation activities and preparation of the safe enclosure (SE); a 35 years SE period, followed by deferred dismantling. 'Updated Decommissioning Strategy for Units 1-4 of Kozloduy NPP' was issued in June 2006. The Updated Strategy is based on the so called 'Continuous Dismantling' Concept. The updated Strategy starts preparatory work earlier and then moves into dismantling work without a significant gap. The aim is to achieve a more optimal distribution of the dismantling activities along the time, saving jobs and the existing knowledge of the plant personnel during the decommissioning, and ensuring smooth and more effective use of financial and human resources and of the available infrastructure for waste treatment. This paper gives general information about the updated strategy and activities required for its implementation. (author)

  3. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  4. Seismic qualification of moderator system pump-motor units for RAPP-3,4 and KAIGA-1,2 235 MWe PHWRs

    International Nuclear Information System (INIS)

    Neelwarne, A.; Soni, R.S.; Kushawaha, H.S.; Mahajan, S.C.; Kakodkar, A.

    1992-01-01

    Smooth operation of active components like primary heat transport pumps, moderator pumps, emergency core cooling pumps etc. is always required to ensure safety of any nuclear power plants in case of normal as well as abnormal conditions such as earthquake loading. In order to ensure the functional requirement of such rotating equipment, is necessary to demonstrate, either through theoretical means or through experimental means, that in an event like earthquake loading, the static parts and the rotating parts of the equipment do not rub against each other giving rise to trouble during their operation. The moderator system pump units for RAPP-3,4 and Kaiga-1,2 have been analysed theoretically to demonstrate the structural integrity of various components of the unit as well as the functional requirement during an earthquake loading. A detailed Finite Element Model (FEM) was prepared for this which includes the modelling of static parts, rotating parts, anti-friction bearings and fluid-film journal bearings. Response spectrum analysis of the unit was carried out using the applicable floor response spectra for RAPP-3,4 and Kaiga-1,2 sites. It was concluded from this analysis that the pump-motor unit analysed meets the required design intent in terms of structural integrity and operability of the unit. The present report gives a detailed description of the problem, the development of FEM model, results and the conclusions arrived at. (author). 23 refs., 9 tabs., 17 figs

  5. 75 FR 13606 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Science.gov (United States)

    2010-03-22

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. STN 50-528, STN 50-529, and STN 50-530; NRC-2010-0114] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental...-74, issued to Arizona Public Service Company (APS, the licensee), for operation of the Palo Verde...

  6. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391)

    International Nuclear Information System (INIS)

    Tam, P.S.

    1992-10-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), and Supplement No. 9 (June 1992) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units I and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  7. Estimation of the influence of the early termination of the operation of units 1- 4 in NPP Kozloduy on the greenhouse gas emissions and the obligations of Republic of Bulgaria regarding the Kyoto Protocol

    International Nuclear Information System (INIS)

    Christov, Chr.; Vasilev, Hr.

    2003-01-01

    The case of early termination of the operation of units 1 - 4 in NPP 'Kozloduy' would have a considerable impact on the greenhouse gas (GHG) emissions because in the structure of the electricity production the nuclear power plant occupies over 40%. Due to decrease of the share of the nuclear energy in the electricity production the share of the solid and gaseous fuels increases. They are a considerable source of GHG. Three scenarios for the development of the electric power sector until year 2015 have been studied for the case of early termination of the operation of units 1 - 4 in NPP: Scenario 1: Early termination of the operation of units 1 - 4 according to terms pointed out by the EU. Scenario 2: Decommissioning of units 1 - 4 according to term in the project design. Scenario 3: Early termination of the operation of units 1 - 2 according to terms pointed out by the EU and decommissioning of units 3 - 4 according to terms in the project design. Comparative calculations have been performed for the forecasted GHG emission quantities in the first commitment period of the Kyoto Protocol (2008 - 2012). The potential for possible quantities of GHG emissions that could be traded during the entire five-year period are estimated. At minimum possible price of the emissions 5 $US/tCO 2 the annual income will be at least 100 - 130 mill $US. The realistic estimation regarding the omitted benefits due to early termination of the operation of units 1 - 4 is about 900 mill $US for the five year period of Kyoto. The continued operation of units 3 - 4 to the end of the term defined in the project design could make it possible to fulfill an income of 700 mill to 1 billion $US from emission trading

  8. C30 Support Plate for Replacing Function of Service Pool 1 at Unit 2

    International Nuclear Information System (INIS)

    Zsoldos, F.

    2006-01-01

    Paks NPP had a serious event at Unit 2 in April 2003. This event was connected to Service Pool 1, there was a cleaning tank int he pool to clean the fuel assemblies from sediments. The sediment problem has occurred at three of our four units, the cause of this problem was the decontamination of the steam generators. We have not made any decontamination at Unit 4 only, and there is no any problem at Unit 4 at all. The plant tried out the mentioned cleaning method at Unit 2 first time, and the event happened at that time. Because of the event the function of Service Pool 1 was not available, the damaged fuel and the cleaning tank is in the pool at this moment. We got the permission from the authority body to operate again Unit 2. This operation, the planned campaign was a short one because of the limited possibility to set up a proper core from the fuel assemblies what were available. Because of the short campaign we had to prepare a proper solution to accomplish the refuelling at Unit 2. The main obstacle was the unavailable functionality of Service Pool 1 which used to carry in fresh fuel and carry out the spent fuel with usage of C30 casks (we have two C30 casks, as it shown in their names the casks can contain 30 fuel assemblies, fresh or spent fuel depending on the given activity have to be done). The plant started to find out what would be the proper solution to replace the function of Service Pool 1 and the C30 support plate was found out as the possible solution to this problem. This C30 support plate is ready to launch the C30 casks or containers with the fresh or spent fuel into the reactor. It means that this C30 support plate is adjusted to the reactor main surface and in this way it ready to serve replacing Service Pool 1. Of course the reactor is empty during the preparation phase of the refuelling. First we carry out the spent fuel from the spent fuel pool, after that the fresh fuel is carried in and just after these preparing activities can be started

  9. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  10. Development, implementation and operational experience with 900 mm R1T pocket-type bearings at Oskarshamn unit 3 nuclear steam turbine generator

    International Nuclear Information System (INIS)

    Peel, P.; Roos, A.

    2015-01-01

    The Oskarshamn unit 3 nuclear steam turbine generator in Sweden is operated by OKG and, following the extensive PULS upgrade project, delivers an increased rated output of 1450 MW making it the most powerful BWR unit worldwide. Several turbine bearing incidents occurred in 2009 and 2010, which initiated a detailed root cause analysis to determine the reasons and propose appropriate mitigation measures to ensure reliable unit operation. Together with OKG, ALSTOM Power implemented a short-term solution to operate the unit over the winter period of 2010-11. Subsequently, during the annual outage in June 2011, a permanent solution involving a R1T pocket-type bearing design was installed at three shaft-line positions. Since the 1980's, R1T bearings with diameters from 250 to 670 mm have been operating in numerous full-speed (3000/3600 rpm) steam turbine generators. However, this was the first application of a R1T bearing developed at a diameter of 900 mm and for half-speed operation. This paper presents an overview of the bearing development and details the successful operational feedback gathered to date on the three installed bearings. In comparison with the three tilting pad bearing design, which has typically been used on large half-speed ALSTOM Power steam turbine generators to date, it confirms the R1T bearing design as a viable alternative. (authors)

  11. Human Factors Evaluation of Procedures for Periodic Safety Review of Yonggwang Unit no. 1, 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Hee; Lee, Jung Woon; Park, Jae Chang (and others)

    2006-01-15

    This report describes the results of human factors assessment on the plant operating procedures as part of Periodic Safety Review(PSR) of Yonggwang Nuclear Power Plant Unit no. 1, 2. The suitability of item and appropriateness of format and structure in the key operating procedures of nuclear power plants were investigated by the review of plant operating experiences and procedure documents, field survey, and experimental assessment on some part of procedures. A checklist was used to perform this assessment and record the review results. The reviewed procedures include EOP(Emergency Operating Procedures), GOP(General Operating Procedures), AOP(Abnormal Operating Procedures), and management procedures of some technical departments. As results of the assessments, any significant problem challenging the safety was not found on the human factors in the operating procedures. However, several small items to be changed and improved were discovered. An action plan is recommended to accommodate the suggestions and review comments. It will enhance the plant safety on the operating procedure.

  12. On the SU2 unit tensor

    International Nuclear Information System (INIS)

    Kibler, M.; Grenet, G.

    1979-07-01

    The SU 2 unit tensor operators tsub(k,α) are studied. In the case where the spinor point group G* coincides with U 1 , then tsub(k α) reduces up to a constant to the Wigner-Racah-Schwinger tensor operator tsub(kqα), an operator which produces an angular momentum state. One first investigates those general properties of tsub(kα) which are independent of their realization. The tsub(kα) in terms of two pairs of boson creation and annihilation operators are realized. This leads to look at the Schwinger calculus relative to one angular momentum of two coupled angular momenta. As a by-product, a procedure is given for producing recursion relationships between SU 2 Wigner coefficients. Finally, some of the properties of the Wigner and Racah operators for an arbitrary compact group and the SU 2 coupling coefficients are studied

  13. NPP Mochovce units 1 and 2 diagnostic systems

    International Nuclear Information System (INIS)

    Heidenreich, S.

    1997-01-01

    In this paper the diagnostic systems (leak detection monitoring, vibration monitoring, lose parts monitoring, fatigue monitoring) of NPP Mochovce units 1 and 2 are presented. All of the designed diagnostic systems are personal computer based systems

  14. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1986-05-01

    This report, Supplement No. 1 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the applicant) for a license to operate the Beaver valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time the Safety Evaluation Report was published

  15. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  16. Audit Calculations of ATWS for Ulchin Unit 1 and 2 Power Uprate

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jun Soo; Huh, Byung Gil; Choi, Yong Seog; Seul, Kwang Won [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-10-15

    In this study, the regulatory audit calculation for ATWS of Ulchin Unit 1 and 2 with 4.5% power uprate was performed to support the licensing review and to confirm the validity of licensee's calculation. In order to simulate the transient behavior of ATWS initiated by a loss of feed water, the systems of Ulchin Unit 1 and 2 was modeled with MARS-KS 1.3. In this study, the regulatory audit calculation of ATWS for Ulchin 1 and 2 with 4.5% power uprating and 99% MTC in the specific cycle designs was performed. It is conformed that the analysis results of ATWS for Ulchin 1 and 2 power uprate meets the RCS pressure acceptance criteria. An anticipated transient accompanied by a failure in the Reactor Trip System (RTS) to shut down the reactor is defined as an Anticipated Transient Without Scram (ATWS). Under certain postulated conditions, the ATWS could lead to Reactor Coolant system (RCS) pressure boundary fracture and/or core damage. For a conventional pressurized water reactor (PWR), the temperature corresponding to the NSSC notice No.2013.09(Performance Criteria for ECCS of the Pressurized Water Reactor Nuclear Power Plants), 1204 .deg. C and the pressure corresponding to the ASME Boiler and Pressure Vessel Code service level C stress, 221.5 bar is assumed to be an unacceptable plant condition against ATWS, above which the RCS pressure boundary could deform to the point of inoperability and the safe shutdown by injection of borated water could be challenged. Such potentially excessive RCS overpressure may occur in the ATWS initiated from a loss of heat sink. Currently, the modification of Ulchin 1 and 2 operating license for 4.5% power uprate is under review.

  17. 300-FF-1 operable unit remedial investigation phase II report: Physical separation of soils treatability study

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report describes the approach and results of physical separations treatability tests conducted at the Hanford Site in the North Process Pond of the 300-FF-1 Operable Unit. Physical separation of soils was identified as a remediation alternative due to the potential to significantly reduce the amount of contaminated soils prior to disposal. Tests were conducted using a system developed at Hanford consisting of modified EPA equipment integrated with screens, hoppers, conveyors, tanks, and pumps from the Hanford Site. The treatability tests discussed in this report consisted of four parts, in which an estimated 84 tons of soil was processed: (1) a pre-test run to set up the system and adjust system parameters for soils to be processed; (2) a baseline run to establish the performance of the system - Test No. 1; (3) a final run in which the system was modified as a result of findings from the baseline run - Test No. 2; and (4) water treatment.

  18. 300-FF-1 operable unit remedial investigation phase II report: Physical separation of soils treatability study

    International Nuclear Information System (INIS)

    1994-04-01

    This report describes the approach and results of physical separations treatability tests conducted at the Hanford Site in the North Process Pond of the 300-FF-1 Operable Unit. Physical separation of soils was identified as a remediation alternative due to the potential to significantly reduce the amount of contaminated soils prior to disposal. Tests were conducted using a system developed at Hanford consisting of modified EPA equipment integrated with screens, hoppers, conveyors, tanks, and pumps from the Hanford Site. The treatability tests discussed in this report consisted of four parts, in which an estimated 84 tons of soil was processed: (1) a pre-test run to set up the system and adjust system parameters for soils to be processed; (2) a baseline run to establish the performance of the system - Test No. 1; (3) a final run in which the system was modified as a result of findings from the baseline run - Test No. 2; and (4) water treatment

  19. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446): Supplement No. 21

    International Nuclear Information System (INIS)

    1989-04-01

    Supplement 21 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, and 12 to that report were published. This supplement also lists the new issues that have been identified since Supplement 12 was issued and includes the evaluations for licensing items resolved in this interim period. 21 refs

  20. Safety Evaluation Report related to the operation of Clinton Power Station, Unit No. 1, Docket No. 50-461

    International Nuclear Information System (INIS)

    1983-05-01

    Supplement No. 2 to the Safety Evaluation Report on the application filed by Illinois Power Company, Soyland Power Cooperative, Inc., and Western Illinois Power Cooperative, Inc., as applicants and owners, for a license to operate the Clinton Power Station, Unit No. 1, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Harp Township, DeWitt County, Illinois. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement No. 1

  1. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  2. 200-ZP-1 operable unit borehole summary report for FY 1995 and FY 1996

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-10-01

    This document details the well construction, sampling, analyses, and geologic character of the Ringold Formation fluvial unit E gravels as encountered in 16 boreholes in the 200-ZP-1 Operable Unit. These boreholes were drilled by Water Development Hanford Corporation during fiscal years 1995 and 1996. Two of the sixteen boreholes were abandoned; the remaining 14 boreholes were completed as functioning production and compliance wells. The borehole logs and well summary sheets included as Appendices A and B of this document, respectively, depict and describe the vadose zone stratigraphic units encountered during the course of drilling. Appendix C contains the results of sieve analyses conducted on samples obtained via resonant sonic coring and standard split-spoon methods. The sieve analyses were the driver behind the majority of the well designs. Also, for completeness, Appendices D and E contain the well design calculations and the well development process

  3. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 9

    International Nuclear Information System (INIS)

    1985-12-01

    Supplement No. 9 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 8 was issued; and (2) matters that the staff had under review when Supplement No. 8 was issued, specifically those issues which required resolution prior to Unit 2 fuel loading and testing up to 5% of full power

  4. System and Software Design for the Plant Protection System for Shin-Hanul Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Hwang, In Seok; Kim, Young Geul; Choi, Woong Seock; Sohn, Se Do

    2015-01-01

    The Reactor Protection System(RPS) protects the core fuel design limits and reactor coolant system pressure boundary for Anticipated Operational Occurrences (AOOs), and provides assistance in mitigating the consequences of Postulated Accidents (PAs). The ESFAS sends the initiation signals to Engineered Safety Feature - Component Control System (ESF-CCS) to mitigate consequences of design basis events. The Common Q platform Programmable Logic Controller (PLC) was used for Shin-Wolsung Nuclear Power Plant Units 1 and 2 and Shin-Kori Nuclear Power Plant Units 1, 2, 3 and 4 since Digital Plant Protection System (DPPS) based on Common Q PLC was applied for Ulchin Nuclear Power Plant Units 5 and 6. The PPS for Shin-Hanul Nuclear Power Plant Units 1 and 2 (SHN 1 and 2) was developed using POSAFE-Q PLC for the first time for the PPS. The SHN1 and 2 PPS was delivered to the sites after completion of Man Machine Interface System Integrated System Test (MMIS-IST). The SHN1 and 2 PPS was developed to have the redundancy in each channel and to use the benefits of POSAFE-Q PLC, such as diagnostic and data communication. The PPS application software was developed using ISODE to minimize development time and human errors, and to improve software quality, productivity, and reusability

  5. System and Software Design for the Plant Protection System for Shin-Hanul Nuclear Power Plant Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, In Seok; Kim, Young Geul; Choi, Woong Seock; Sohn, Se Do [KEPCO EnC, Daejeon (Korea, Republic of)

    2015-10-15

    The Reactor Protection System(RPS) protects the core fuel design limits and reactor coolant system pressure boundary for Anticipated Operational Occurrences (AOOs), and provides assistance in mitigating the consequences of Postulated Accidents (PAs). The ESFAS sends the initiation signals to Engineered Safety Feature - Component Control System (ESF-CCS) to mitigate consequences of design basis events. The Common Q platform Programmable Logic Controller (PLC) was used for Shin-Wolsung Nuclear Power Plant Units 1 and 2 and Shin-Kori Nuclear Power Plant Units 1, 2, 3 and 4 since Digital Plant Protection System (DPPS) based on Common Q PLC was applied for Ulchin Nuclear Power Plant Units 5 and 6. The PPS for Shin-Hanul Nuclear Power Plant Units 1 and 2 (SHN 1 and 2) was developed using POSAFE-Q PLC for the first time for the PPS. The SHN1 and 2 PPS was delivered to the sites after completion of Man Machine Interface System Integrated System Test (MMIS-IST). The SHN1 and 2 PPS was developed to have the redundancy in each channel and to use the benefits of POSAFE-Q PLC, such as diagnostic and data communication. The PPS application software was developed using ISODE to minimize development time and human errors, and to improve software quality, productivity, and reusability.

  6. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  7. 76 FR 40754 - Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units...

    Science.gov (United States)

    2011-07-11

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0100; Docket Nos. 50-413 and 50-414; Docket Nos. 50-369 and 50-370; Docket Nos. 50-269, 50-270, And 50-287] Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; Oconee Nuclear Station, Units 1, 2, and 3; Notice...

  8. Safety Evaluation Report related to the operation of South Texas Project, Unit 2 (Docket No. 50-499)

    International Nuclear Information System (INIS)

    1989-01-01

    In April 1986 the staff of the US Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0781) regarding the application of Houston Lighting and Power Company (applicant and agent for the owners) for a license to operate South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). The facility is located in Matagorda County, Texas, west of the Colorado River, 8 miles north-northwest of the town of Matagorda and about 89 miles southwest of Houston. The first supplement to NUREG-0781 was issued in September 1986, the second supplement in January 1987, the third supplement in May 1987, the fourth supplement in July 1987 and the fifth supplement in March 1988. This sixth supplement provides updated information on the issues that had been considered previously as well as the evaluation of issues that have arisen since the fifth supplement was issued. The evaluation resolves all the issues necessary to support the issuance of a low-power license for Unit 2

  9. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.; Gorton, Alicia M.; Bisping, Lynn E.; Brandenberger, Jill M.; Pino, Christian; Martinez, Dominique M.; Rana, Komal; Wellman, Dawn M.

    2014-11-20

    Prior to the acquisition of land by the U.S. Department of War in February 1943 and the creation of the Hanford Site, the land along the Columbia River was home to over 1000 people. Farming and orchard operations by both homesteaders and commercial organizations were prevalent. Orchard activities and the associated application of lead arsenate pesticide ceased in 1943, when residents were moved from the Hanford Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead arsenate pesticide persist in some locations on the Hanford Site. In 2012, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology established the 100-OL-1 Operable Unit (OU) through the Hanford Federal Facility Agreement and Consent Order, known as the Tri-Party Agreement. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located south of the Columbia River and east of the present-day Vernita Bridge, and extend southeast to the former Hanford townsite. The discontinuous orchard lands within 100-OL-1 OU are approximately 20 km2 (5000 ac). A pilot study was conducted to support the approval of the remedial investigation/feasibility study work plan to evaluate the 100-OL-1 OU. This pilot study evaluated the use of a field portable X-ray fluorescence (XRF) analyzer for evaluating lead and arsenic concentrations on the soil surface as an indicator of lead arsenate pesticide residues in the OU. The objectives of the pilot study included evaluating a field portable XRF analyzer as the analytical method for decision making, estimating the nature and extent of lead and arsenic in surface soils in four decision units, evaluating the results for the purpose of optimizing the sampling approach implemented in the remedial investigation, and collecting information to improve the cost estimate and planning the cultural resources review for sampling activities in the remedial investigation. Based on

  10. Operational aerial snow surveying in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Peck, E L; Carroll, T R; Vandemark, S C

    1980-03-01

    An airborne gamma radiation detector and data acquisition system has been designed for rapid measurement of the snow cover water equivalent over large open areas. Research and field tests conducted prior to the implementation of an operational snow measurement system in the United States are reviewed. Extensive research test flights were conducted over large river basins of the north-central plains and in the high mountain valleys of the inter-mountain West. Problems encountered during development include: (1) error in the gross gamma flux produced by atmospheric radon gas daughters; (2) spatial and temporal variability in soil moisture; and (3) errors in gamma radiation count rate introduced by aircraft and cosmic background radiation. Network design of operational flight line and ground observation data used in a river forecasting system are discussed. 22 references, 4 figures, 2 tables.

  11. Summary of field operations Magazine Road North Wells MRN-1 and MRN-2

    International Nuclear Information System (INIS)

    Fritts, J.E.; McCord, J.P.

    1996-03-01

    This report provides a summary of the field operations associated with the installation of the MRN-1 and MRN-2 test/monitoring wells. These wells were installed in December 1994 and January 1995 as part of the Site-Wide Hydrogeologic Characterization (SWHC) task field program. The SWHC task is part of the Sandia National Laboratories, New Mexico, Environmental Restoration Project carried out by the Environmental Operations Center, 7500. MRN-1 and MRN-2 are paired wells located near the western edge of Kirtland Air Force Base (KAFB), west of Technical Area 3 (TA3), and north of Magazine Road. (Note: MRN stands for Magazine Road North). During the MRN field operations, important subsurface geologic, hydrologic, chemical, and radiological data were obtained. Subsurface geologic data include descriptions of drill cuttings, core, and geophysical logs of the upper unit of the Santa Fe Group. The geology identified here can help determine the eastern limit of the ancestral Rio Grande lithofacies. Subsurface hydrologic data include borehole geophysical logs, and qualitative information obtained during well completion and development. In addition, future aquifer testing at the MRN site will generate data for the interpretation of aquifer parameters such as transmissivity. Samples were taken from core every 100 feet at MRN-1 for chemical and radiological analysis to provide background data for the Environmental Restoration Project

  12. Rate of generation of tritium during the operation of Tsuruga Power Station Unit No. 2

    International Nuclear Information System (INIS)

    Funamoto, Hisao; Yoshinari, Masaharu; Fukuda, Masayuki; Makino, Shinichi; Watari, Tuneo

    1994-01-01

    Total amount of 3 H activity in primary coolant due to the operation of Tsuruga Power Station Unit No. 2 was estimated. The 3 H inventory was measured for samples from the spent fuel pool, primary coolant and miscellaneous tanks. From the result of the measurement and the data of environmental release of 3 H, the rate of generation of 3 H in the reactor was found to be 25 TBq/GWa. Since Tsuruga Power Station Unit No. 2 is a PWR type reactor, we presume that most of the 3 H in primary coolant is formed by 10 B(n, 2α) 3 H reaction. It is necessary to release about 23 TBq/GWa of 3 H to maintain the station inventory at the present level. (author)

  13. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, (Docket Nos. 50-390 and 50-391), Tennessee Valley Authority

    International Nuclear Information System (INIS)

    1992-06-01

    This report supplements the Safety Evaluation Report (SER), NUREG- 0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), and Supplement No. 8 (January 1992) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  14. Safety Evaluation Report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement No. 3

    International Nuclear Information System (INIS)

    1986-08-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Company, Municipal Electric Authority of Georgia, Oglethorpe Power Corporation, and City of Dalton, Georgia, for a license to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the staff in October 1985, and Supplement 2 was issued in May 1986. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This third supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved at the time the Safety Evaluation Report was issued. This supplement also discusses some new open items

  15. Chapter 2. The production units

    International Nuclear Information System (INIS)

    1998-01-01

    In the second chapter of this CD ROM the production units of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.), are presented. It consist of next paragraphs: (1) Nuclear power plants (A-1 Nuclear Power Plant (History, Technological scheme, basic data are presented); V-1, V-2 Bohunice Nuclear Power Plant (History 1972-1985, technological scheme; nuclear safety, radiation protection, heat supply, international co-operation and basic data are presented); Mochovce Nuclear Power Plant (History 1980-1998, technological scheme, construction completion, milestones of commissioning, safety and environmental protection as well as basic data are included). (2) Conventional sources of energy (Vojany fossil power plant (History 1959-1992, Technological units of power plant, Impact of operation on the environment, Plant of Vojany FPP Renewal and Reconstruction, Basic data are listed), Novaky fossil power plant (History 1949-1998, Technological scheme, current investment construction, basic data, Handlova heating plant). Kosice Combined Heat Power Plant (History 1960-1995, technological scheme, State metrology centre, acredited chemical laboratory, basic data). (3) Hydroelectric power plants (Trencin HPPs: Cierny Vah pumped storage HPP, Liptovska Mara HPP, Orava HPP, Sucany HPP, Miksova HPP, Nosice HPP, Velke Kozmalovce HPP, Gabcikovo HPP, Dubnica HPP, Nove Mesto n/V HPP, Madunice HPP, Kralova HPP) and Dobsina HPPs: (Dobsina HPP, Ruzin HPP, Domasa HPP, small HPPs) are presented

  16. Start-up and operation of Laguna Verde-2

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1996-01-01

    The 665 MWe Laguna Verde-2 nuclear generating unit was accepted into commercial operation on April 10, 1995. The boiling water reactor plant by General Electric (GE) was first synchronized with the grid on November 11, 1994. Laguna Verde-2 is identical with Laguna Verde-1 on the same site. That unit had gone critical for the first time in November 1988 and had first been synchronized with the power grid on April 13, 1989. Commercial operation of Laguna Verde-1 had been started on July 29, 1990. Mexico's only nuclear power plant had been built 70 km north of Veracruz on the east coast and had been scheduled to start operation in 1976. As the Mexican nuclear power program was reduced, the scheduled commissioning dates suffered more and more delays. In the full of 1987, the investigation by the Operational Safety Review Team (Osart) of the International Atomic Energy Agency (IAEA) had indicated that the safety requirements of installations and equpiment were met, and that the whole plant was well prepared for fueling. In mid-1988, the Mexican Government had issued the permit to fuel the Laguna Verde-1 reactor. The contract to build the two units had been awarded in 1972/73. No other nuclear power plants are currently under construction or in the planning phase in Mexico. (orig.) [de

  17. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  18. Operation of Beaver Valley Power Station, Unit 2, Docket No. 50-412, Beaver County, Pennsylvania

    International Nuclear Information System (INIS)

    1985-09-01

    The final environmental impact statement (EPA No. 850438F) assesses the effects of operating a pressurized water reactor in Pennsylvania on the south bank of the Ohio River, which would serve as the final heat sink for the cooling system. Operation of Unit 2 would add 836 MW of capacity and increase system reliability. The plant would employ 465 at an $18 million payroll. Facilities for the plant would take up 56 acres of agricultural land. The operation result in both water and noise pollution. There is only a small probability of impacts due to potential radiation exposure. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Regulations require the impact statement

  19. 40 CFR 73.18 - Submittal procedures for units commencing commercial operation during the period from January 1...

    Science.gov (United States)

    2010-07-01

    ... commencing commercial operation during the period from January 1, 1993, through December 31, 1995. 73.18 Section 73.18 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Allocations § 73.18 Submittal procedures for units...

  20. Safety evaluation report related to the operation of Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425): Supplement 8

    International Nuclear Information System (INIS)

    1989-02-01

    In June 1985, the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-1137) regarding the application of Georgia Power Corporation, and the City of Dalton, Georgia, for licenses to operate the Vogtle Electric Generating Plant, Units 1 and 2 (Docket Nos. 50-424 and 50-425). Supplement 1 to NUREG-1137 was issued by the Staff in October 1985, Supplement 2 was issued in May 1986, Supplement 3 was issued in August 1986, Supplement 4 was issued in December 1986, Supplement 5 was issued in January 1987, Supplement 6 was issued in March 1987, and Supplement 7 was issued in January 1988. The facility is located in Burke County, Georgia, approximately 26 miles south-southeast of Augusta, Georgia, and on the Savannah River. This eighth supplement to NUREG-1137 provides recent information regarding resolution of some of the open and confirmatory items that remained unresolved following issuance of Supplement 7. 5 figs., 3 tabs

  1. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  2. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  3. Final Hazard Categorization for the Remediation of Six 300-FF-2 Operable Unit Solid Waste Burial Grounds

    International Nuclear Information System (INIS)

    Ludowise, J.D.

    2006-01-01

    This report provides the final hazard categorization (FHC) for the remediation of six solid waste disposal sites (referred to as burial grounds) located in the 300-FF-2 Operable Unit (OU) on the Hanford Site. These six sites (618-1, 618-2, 618-3, 618-7, 618-8, and 618-13 Burial Grounds) were determined to have a total radionuclide inventory (WCH 2005a, WCH 2005d, WCH 2005e and WCH 2006b) that exceeds the DOE-STD-1027 Category 3 threshold quantity (DOE 1997) and are the subject of this analysis. This FHC document examines the hazards, identifies appropriate controls to manage the hazards, and documents the FHC and commitments for the 300-FF-2 Burial Grounds Remediation Project

  4. Final Hazard Categorization for the Remediation of Six 300-FF-2 Operable Unit Solid Waste Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    J. D. Ludowise

    2006-12-12

    This report provides the final hazard categorization (FHC) for the remediation of six solid waste disposal sites (referred to as burial grounds) located in the 300-FF-2 Operable Unit (OU) on the Hanford Site. These six sites (618-1, 618-2, 618-3, 618-7, 618-8, and 618-13 Burial Grounds) were determined to have a total radionuclide inventory (WCH 2005a, WCH 2005d, WCH 2005e and WCH 2006b) that exceeds the DOE-STD-1027 Category 3 threshold quantity (DOE 1997) and are the subject of this analysis. This FHC document examines the hazards, identifies appropriate controls to manage the hazards, and documents the FHC and commitments for the 300-FF-2 Burial Grounds Remediation Project.

  5. ATLAS Strip Detector: Operational Experience and Run1-> Run2 Transition

    CERN Document Server

    Nagai, Koichi; The ATLAS collaboration

    2014-01-01

    Large hadron collider was operated very successfully during the Run1 and provided a lot of opportunities of physics studies. It currently has a consolidation work toward to the operation at $\\sqrt{s}=14 \\mathrm{TeV}$ in Run2. The ATLAS experiment has achieved excellent performance in Run1 operation, delivering remarkable physics results. The SemiConductor Tracker contributed to the precise measurement of momentum of charged particles. This paper describes the operation experience of the SemiConductor Tracker in Run1 and the preparation toward to the Run2 operation during the LS1.

  6. Qualification of Daiichi Units 1, 2, and 3 Data for Severe Accident Evaluations - Process and Illustrative Examples from Prior TMI-2 Evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Rempe, Joy Lynn [Idaho National Lab. (INL), Idaho Falls, ID (United States); Knudson, Darrell Lee [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The accidents at the Three Mile Island Unit 2 (TMI-2) Pressurized Water Reactor (PWR) and the Daiichi Units 1, 2, and 3 Boiling Water Reactors (BWRs) provide unique opportunities to evaluate instrumentation exposed to severe accident conditions. Conditions associated with the release of coolant and the hydrogen burn that occurred during the TMI-2 accident exposed instrumentation to harsh conditions, including direct radiation, radioactive contamination, and high humidity with elevated temperatures and pressures. As part of a program initiated in 2012 by the Department of Energy Office of Nuclear Energy (DOE-NE), a review was completed to gain insights from prior TMI-2 sensor survivability and data qualification efforts. This initial review focused on the set of sensors deemed most important by post-TMI-2 instrumentation evaluation programs. Instrumentation evaluation programs focused on data required by TMI-2 operators to assess the condition of the reactor and containment and the effect of mitigating actions taken by these operators. In addition, prior efforts focused on sensors providing data required for subsequent forensic evaluations and accident simulations. To encourage the potential for similar activities to be completed for qualifying data from Daiichi Units 1, 2, and 3, this report provides additional details related to the formal process used to develop a qualified TMI-2 data base and presents data qualification details for three parameters: primary system pressure; containment building temperature; and containment pressure. As described within this report, sensor evaluations and data qualification required implementation of various processes, including comparisons with data from other sensors, analytical calculations, laboratory testing, and comparisons with sensors subjected to similar conditions in large-scale integral tests and with sensors that were similar in design to instruments easily removed from the TMI-2 plant for evaluations. As documented

  7. Outline of construction and facility features of Onagawa nuclear power station Unit No. 2

    International Nuclear Information System (INIS)

    Umimura, Yoshiharu; Tsunoda, Ryohei; Watanabe, Kazunori

    1996-01-01

    Tohoku Electric Power Company promotes development of various power sources to provide a stable supply of electricity in the future, and nuclear power takes a leading part. In August 1989, construction of Onagawa nuclear power plant Unit No. 2 (825MW) was started, following Unit No. 1 (524MW) which went on line in 1984 as Tohoku Electric's first nuclear power plant unit. Unit No. 2 began commercial operation in July 1995 through satisfactory construction work such as RPV hydraulic test in March 1994, fuel loading in October 1994, and various startup tests in each power stage. The design and construction of Unit No. 2 reflect construction and operation experience gained from Unit No. 1, and the latest technology, including that of the LWR Improvement and Standardization Program, was adopted to enhance facility reliability, improve operation and maintenance performance, and reduce worker dosage. Features of the facility, construction techniques, and a description of preoperation of Onagawa nuclear power plant Unit No. 2 are described in this paper. (author)

  8. Final environmental statement related to the operation of Callaway Plant, Unit No. 1 (Docket No. 50-483)

    International Nuclear Information System (INIS)

    1982-01-01

    The final environmental statement contains the second assessment of the environmental impact associated with operation of Callaway Plant Unit 1, pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Par 51, as amended, of the NRC's regulations. This statement examines: the purpose and need for the Callaway project, alternatives to the project, the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. No water-use impacts are expected from cooling-tower markup withdrawn from, or blowdown discharged into, the Missouri River. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts from cooling-tower drift and other emissions and dust will also be small. Impacts to historic and prehistoric sites will be negligible with the development and implementation of the applicant's cultural-resources management plan. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of the Callaway Plant. 18 figs., 16 tabs

  9. Limited field investigation report for the 100-NR-1 operable unit. Draft A

    International Nuclear Information System (INIS)

    1994-08-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-NR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land-use scenarios. An LFI report is required when waste sites are to be considered for IRM and existing data are insufficient to formulate a conceptual model or perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify potential contaminant and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose a risk to human health or the environment that warrants action through IRM. Seven sites were intrusively investigated: 1322-N, 116-N-2, 119-N, 120-N-2, 120-N-1, South Settling Pond, and the 166-N Tank Farm (UN-100-N-17) unplanned release at the 166-N Tank Farm. Vadose zone sediments from these sites were sampled and analyzed. Radiological contamination is the primary concern as confirmed through this study

  10. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 2, Part 1C: Analysis of core damage frequency from internal events for plant operational State 5 during a refueling outage, Main report (Sections 11--14)

    International Nuclear Information System (INIS)

    Whitehead, D.; Darby, J.; Yakle, J.

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf

  11. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 7, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Unit 3 generated 1,968,074 MWh(e) net electric power and the generator was on line 2,802.9 hrs. Unit 4 generated 2,560,476 MWh(e) and was on line 3,944.8 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, radiological environmental monitoring, and occupational personnel radiation monitoring

  12. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530)

    International Nuclear Information System (INIS)

    1984-10-01

    Supplement No. 6 to the Safety Evaluation Report for the application filed by Arizona Public Service Company, et al., for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of (1) additional information submitted by the applicant since Supplement No. 5 was issued and (2) matters that the staff had under review when Supplement No. 5 was issued

  13. Final Environmental Statement related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-09-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with Beaver Valley Power Station Unit 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs, and concludes that the action called for is the issuance of an operating license for Beaver Valley Unit 2

  14. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  15. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  16. The primary circuit materials properties results analysis performed on archive material used in NPP V-1 and Kola NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kupca, L.; Beno, P. [Nuclear Power Plants Research Institute Inc., Trnava (Slovakia)

    1997-04-01

    A very brief summary is provided of a primary circuit piping material properties analysis. The analysis was performed for the Bohunice V-1 reactor and the Kola-1 and -2 reactors. Assessment was performed on Bohunice V-1 archive materials and primary piping material cut from the Kola units after 100,000 hours of operation. Main research program tasks included analysis of mechanical properties, corrosion stability, and microstructural properties. Analysis results are not provided.

  17. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 2: Internal Events Appendices A to H

    International Nuclear Information System (INIS)

    Darby, J.; Whitehead, D.; Staple, B.; Dandini, V.

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf

  18. Draft environmental statement: Related to operation of the Edwin I. Hatch Nuclear Plant Unit No. 2, Georgia Power Company: Docket No. 50-366

    International Nuclear Information System (INIS)

    1977-04-01

    The proposed action is the issuance of an operation license to the Georgia Power Company for the startup and operation of the Edwin I. Hatch Nuclear Plant, Unit No. 2 (Docket No. 50-366), located on the Altamaha River in Appling County, approximately 11 miles north from Baxley, Georgia. The information in this Statement represents the second, assessment of the environmental impact associated with the Edwin I. Hatch Nuclear Plant, Unit No. 2, pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receipt of an application, in 1970, to construct this plant, the staff carried out a review of impact that would occur during the construction and operation of this plant. That evaluation was issued as a Final Environmental Statement in October 1972. As the result of that environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and a public hearing in Baxley, Georgia and Washington, D.C., the AEC (now NRC) issued a permit in December 1972, for the construction of Unit No. 2 of the Edwin I. Hatch Nuclear Plant. As of February 1977, the construction of Unit No. 2 was 70% complete. With a proposed fuel-loading date of April 1978 for Unit No. 2, the applicant has petitioned for license to operate Unit No. 2 and has submitted (July 1975) the required safety and environmental reports to substantiate this petition. 97 refs., 18 figs., 37 tabs

  19. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  20. 200-UP-1 Operable Unit borehole summary report for FY 1995

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-07-01

    This report details the well construction, sampling, analyses, and geologic character of the Ringold Formation as it was encountered in five wells drilled in the 200-UP-1 Operable Unit during fiscal year (FY) 1995. The 200-UP-1 Interim Remedial Measure Drilling Description of Work was prepared to support the FY 95 field work and presented the specific field activities and procedural requirements to be implemented. The geology of the vadose zone is not described in the text of this report. Vadose zone geology in the immediate area is characterized in sufficient detail in existing documents. However, the borehole logs and well summary sheets provided in the appendices depict the vadose zone stratigraphy and well construction details. Sieve analyses conducted on sediments from the saturated zone were used to design the well completions; these analyses are included. Where applicable, inferences are made concerning the geologic character of the saturated interval. In addition, a synopsis of the preliminary well development process is outlined. Other related information is included with this report as supplemental data

  1. Bruce A units 1 and 2 restart project

    International Nuclear Information System (INIS)

    Routledge, K.

    2006-01-01

    This presentation provides an overview of the Bruce A Units 1 and 2 Restart project from the vantage point of the Project Management Contractor (PMC). The presentation will highlight the unique structure of the project, which has been designed to maximize project efficiencies while minimizing the impact to the Bruce Power operational reactors. Efficiency improvements covered in the presentation includes: support services provided to the direct work contractors, radiation protection, worker protection, engineering, field execution, maintenance and facilities. The presentation focusses on the roles of the PMC in helping to ensure the successful outcome of this ambitious reactor refurbishment project. In addition, the Construction Island concept that has been implemented on the project will be presented, with some of the innovative thinking that has gone into its creation. The organization of the PMC and an overview of the project schedule is also presented. AMEC NCL is a privately held consultancy in the Canadian nuclear industry which provides experienced and flexible multi-disciplined resources to support full project management, engineering solutions and safety consultancy services throughout the life cycle of nuclear facilities in Canada, and for customers in related markets in North America and overseas. AMEC NCL is a wholly-owned subsidiary of AMEC plc

  2. Geophysical investigation of the 120-KE-3 and 118-K-2 sites, 100-KR-2 operable unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Mitchell, T.H.; Bolin, B.J.

    1995-04-01

    Geophysical investigations using ground-penetrating radar (GPR) and electromagnetic induction (EMI) were conducted at two waste sites, 120-KE-3 and 118-K-2, in the 100-K Area (Figure 1). Both of the sites are located within Operable Unit 100-KR-2. The 120-KE-3 waste site (Figure 2), also known as the 183-Filter Water Facility Trench and 100-KE-3, received sulfuric acid sludge from sulfuric acid storage tanks that were contaminated with 700 kg of mercury. The trench is documented as 3 ft wide by 3 ft deep by 40 ft long. However, part or all of the trench was excavated when an outside contractor attempted to recover the mercury (Carpenter and Cote 1994). Therefore, the actual size of the ''disturbed area'' from the trench and subsequent excavation is unknown. The objective of the geophysical investigation was to locate the original or reworked trench. The 118- K-2 site (Figure 3) was reportedly used to dispose radioactive sludge from the 116-KE-4 and 116-KW-3 retention basins. The size of the ''trench'' is unknown and documentation shows it in two different locations. No other information si available on the site. The objective of the investigation was to locate the trench

  3. Safety evaluation report: related to the operation of Perry Nuclear Power Plant, Units 1 and 2, Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group, CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 441). The facility is located near Lake Erie in Lake County, Ohio. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  4. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  5. Cernavoda - Unit 2. A strategic project for Romania

    International Nuclear Information System (INIS)

    Saroudis, J.I.; Chirica, T.; Villabruna, G.

    1999-01-01

    The paper presents some key aspects of the Romanian nuclear program, focusing on Cernavoda NPP Unit No. 2 and the partnership with Atomic Energy of Canada Ltd. (AECL) and ANSALDO Italy for completion of this project. A brief historical presentation of the Romanian nuclear program is included. The success of Cernavoda NPP Unit 1 represents an important element in finalizing Unit 2 in an advanced state of equipment installation and more than 40 % complete. Also, the national infrastructure, including the legal framework and new Electricity Law represents a positive element for Project completion. The Romanian Nuclear Regulatory Body represents the guarantee for the safe operation of CANDU reactors in Romania.(author)

  6. 75 FR 36700 - Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit 1; Environmental...

    Science.gov (United States)

    2010-06-28

    ...; Three Mile Island Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact... Company, LLC (the licensee), for operation of Three Mile Island Nuclear Station, Unit 1 (TMI-1), located... Three Mile Island Nuclear Station, Units 1 and 2, NUREG-0552, dated December 1972, and Generic...

  7. Pilot Operation of Ex-core Neutron Sensors of Divers Shutdown System (DSS) Unit 2 Ignalina NPP

    International Nuclear Information System (INIS)

    Jakshtonis, Z.; Krivoshei, G.

    2006-01-01

    The Ignalina Safety Assessment, which was completed in December 1996, recommended the installation of a diverse shutdown system on the 2nd unit at Ignalina. During the PPR-2004 in the DSS project are created two independent shutdown systems by separating the absorber rods into two independent groups as follows: 1. One system (designated AZ) consists of the existing 24 BAZ rods and 49 AZ/BSM rods that together are used for reliable reactor shutdown (including Control and Protection System (CPS) circuit voiding accident). This system performs the emergency protection function. 2. The other system (designated BSM) comprises the remaining absorber rods and the 49 AZ/BSM rods. Thus 49 AZ/BSM rods are actuated from AZ initiating equipment as well as from BSM initiating equipment. The BSM system performs the normal reactor shutdown function and is able to ensure long-term maintenance of the reactor in the sub-critical state. Along with implementation of DSS was modernized existing Emergency Process Protection System, which was divided into two independent Sets of initiating equipment. The DSS is independent and diverse initiating equipment from the existing 1st Set equipment; with each set having its own independent in-core and ex-core sensors for measurement of neutron flux and process parameters. The 2nd Set of initiating equipment for measuring ex-core neutron flux, was modernized with new design of 4 Ex-Core detectors each have a single low level neutron flux detector and two high range neutron detectors. They are comprising: 1. A fission chamber which operates in pulse mode to cover the low flux levels. 2. A compensated ionisation chamber in current mode to operate at high flux level. This detector is doubled to give a measurement of the axial deviation. Two detectors are enough to produce the axial power deviation. The results of testing and analysis of pilot operation of ex-core neutron sensors of DSS will be shown on the Report. (author)

  8. Safety evaluation report related to the operation of Clinton Power Station, Unit No. 1 (Docket No. 50-461). Suppl. 3

    International Nuclear Information System (INIS)

    1984-05-01

    Supplement No. 3 to the Safety Evaluation Report on the application filed by Illinois Power Company, Soyland Power Cooperative, Inc., and Western Illinois Power Cooperative, Inc., as applicants and owners, for a license to operate the Clinton Power Station, Unit No. 1, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Harp Township, DeWitt County, Illinois. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplements No. 1 and 2

  9. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 7

    International Nuclear Information System (INIS)

    1985-11-01

    Supplement No. 7 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket No. 50-440 and 50-441) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 6 to that report

  10. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 6

    International Nuclear Information System (INIS)

    1985-04-01

    Supplement No. 6 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-540 and 50-441), has been prepared by the Office of the Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 5 to that report

  11. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 8

    International Nuclear Information System (INIS)

    1986-01-01

    Supplement No. 8 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units and 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that has not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 7 to that report

  12. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 5

    International Nuclear Information System (INIS)

    1985-02-01

    Supplement No. 5 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, The Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 through 4 to that report

  13. Reactor Core Internals Replacement of Ikata Units 1 and 2

    International Nuclear Information System (INIS)

    Ikeda, K.; Ishikawa, T.; Miyoshi, T.; Takagi, T.

    2012-01-01

    This paper presents an overview of the reactor core internals replacement project carried out at the Ikata Nuclear Power Station in Japan, which was the first of its kind among PWRs in the world. Failure of baffle former bolts was first reported in 1989 at Bugey 2 in France. Since then, similar incidents have been reported in Belgium and in the U.S., but not in Japan. However, the possibility of these bolts failing in Japanese plants cannot be denied in the future as operating hours increase. Ageing degradation mechanisms for the reactor core internals include irradiation-assisted stress corrosion cracking of baffle former bolts and mechanical wear of control rod guide cards. Two different approaches can be taken to address these ageing issues: to inspect and repair whenever a problem is found; and to replace the entire core internals with those of a new design having advanced features to prevent ageing degradation problems. The choice of our company was the latter. This paper explains the reasons for the choice and summarizes the replacement project activities at Ikata Units 1 and 2 as well as the improvements incorporated in the new design. (author)

  14. Fuel Summary for Peach Bottom Unit 1 High-Temperature Gas-Cooled Reactor Cores 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Karel I. Kingrey

    2003-04-01

    This fuel summary report contains background and summary information for the Peach Bottom Unit 1, High-Temperature, Gas-Cooled Reactor Cores 1 and 2. This report contains detailed information about the fuel in the two cores, the Peach Bottom Unit 1 operating history, nuclear parameters, physical and chemical characteristics, and shipping and storage canister related data. The data in this document have been compiled from a large number of sources and are not qualified beyond the qualification of the source documents. This report is intended to provide an overview of the existing data pertaining to spent fuel management and point to pertinent reference source documents. For design applications, the original source documentation must be used. While all referenced sources are available as records or controlled documents at the Idaho National Engineering and Environmental Laboratory (INEEL), some of the sources were marked as informal or draft reports. This is noted where applicable. In some instances, source documents are not consistent. Where they are known, this document identifies those instances and provides clarification where possible. However, as stated above, this document has not been independently qualified and such clarifications are only included for information purposes. Some of the information in this summary is available in multiple source documents. An effort has been made to clearly identify at least one record document as the source for the information included in this report.

  15. The construction of the GKN 2 nuclear power plant. Pt. 1 and 2

    International Nuclear Information System (INIS)

    Rau, G.; Zaiss, W.

    1987-01-01

    Unit 2 of the nuclear power station is a convoy plant with a 4-loop PWR of 1314 MW gross electricity output. The contractual period of delivery up to takeover is 67 months. The contractual operators of unit 1 and unit 2 are: Neckarwerke (NW), Esslingen, the Technical Works of Stuttgart Municipality, (TWS), the Federal Railways (DB), and the Cement Works Lauffen (ZEAG). In addition, the electric utility Energieversorgung Schwaben (EVS) has signed as an operator of unit 2, because of its higher unit output. These partners own the following shares, related to the gross power output of both units: NW 41.5%, TWS 25.6, DB 17.5%, EVS 12.4%, ZEAG 3.0%. (orig./GL) [de

  16. Treatment/Disposal Plan for Drummed Waste from the 300-FF-1 Operable Unit, 618-4 Burial Ground

    International Nuclear Information System (INIS)

    Lerch, J.A.

    1999-01-01

    The objective of this plan is to support selection of a safe, environmentally responsible, and cost-effective treatment and disposal method for drums containing depleted uranium metal chips submerged in oil that have been and will be excavated from the 618-4 Burial Ground. Remediation of the 300-FF-1 Operable Unit, 618-4 Burial Ground was initiated in fiscal year (FY) 1998 as an excavation and removal operation. Routine processes were established to excavate and ship contaminated soil and debris to the Environmental Restoration Disposal Facility (ERDF) for disposal

  17. The electrostatic role of the Zn-Cys2His2 complex in binding of operator DNA with transcription factors: mouse EGR-1 from the Cys2His2 family.

    Science.gov (United States)

    Chirgadze, Y N; Boshkova, E A; Polozov, R V; Sivozhelezov, V S; Dzyabchenko, A V; Kuzminsky, M B; Stepanenko, V A; Ivanov, V V

    2018-01-07

    The mouse factor Zif268, known also as early growth response protein EGR-1, is a classical representative for the Cys2His2 transcription factor family. It is required for binding the RNA polymerase with operator dsDNA to initialize the transcription process. We have shown that only in this family of total six Zn-finger protein families the Zn complex plays a significant role in the protein-DNA binding. Electrostatic feature of this complex in the binding of factor Zif268 from Mus musculus with operator DNA has been considered. The factor consists of three similar Zn-finger units which bind with triplets of coding DNA. Essential contacts of the factor with the DNA phosphates are formed by three conservative His residues, one in each finger. We describe here the results of calculations of the electrostatic potentials for the Zn-Cys2His2 complex, Zn-finger unit 1, and the whole transcription factor. The potential of Zif268 has a positive area on the factor surface, and it corresponds exactly to the binding sites of each of Zn-finger units. The main part of these areas is determined by conservative His residues, which form contacts with the DNA phosphate groups. Our result shows that the electrostatic positive potential of this histidine residue is enhanced due to the Zn complex. The other contacts of the Zn-finger with DNA are related to nucleotide bases, and they are responsible for the sequence-specific binding with DNA. This result may be extended to all other members of the Cys2His2 transcription factor family.

  18. MAS2-8 radar and digital control unit

    Science.gov (United States)

    Oberg, J. M.; Ulaby, F. T.

    1974-01-01

    The design of the MAS 2-8 (2 to 8 GHz microwave-active spectrometer), a ground-based sensor system, is presented. A major modification in 1974 to the MAS 2-8, that of a control subsystem to automate the data-taking operation, is the prime focus. The digital control unit automatically changes all system parameters except FM rate and records the return signal on paper tape. The overall system operation and a detailed discussion of the design and operation of the digital control unit are presented.

  19. Edwin I. Hatch Nuclear Plant, Unit 1. Semiannual operating report, September 12--December 31, 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Hatch-1 achieved initial criticality on September 12, 1974, and initial synchronization on November 11, 1974. The unit is a BWR of 813 MW(e) and has generated 50,775.6 MWH since September 12 with the generator on line 865.62 hours. Net plant efficiency was 20.88 percent with plant availability of 28.32 percent. Information is presented concerning operations, changes, tests, safety related maintenance, primary coolant chemistry, occupational personnel radiation doses, and radioactive effluent releases. (U.S.)

  20. Form factors of descendant operators: reduction to perturbed M(2,2s+1) models

    International Nuclear Information System (INIS)

    Lashkevich, Michael; Pugai, Yaroslav

    2015-01-01

    In the framework of the algebraic approach to form factors in two-dimensional integrable models of quantum field theory we consider the reduction of the sine-Gordon model to the Φ 13 -perturbation of minimal conformal models of the M(2,2s+1) series. We find in an algebraic form the condition of compatibility of local operators with the reduction. We propose a construction that make it possible to obtain reduction compatible local operators in terms of screening currents. As an application we obtain exact multiparticle form factors for the compatible with the reduction conserved currents T ±2k , Θ ±(2k−2) , which correspond to the spin ±(2k−1) integrals of motion, for any positive integer k. Furthermore, we obtain all form factors of the operators T 2k T −2l , which generalize the famous TT̄ operator. The construction is analytic in the s parameter and, therefore, makes sense in the sine-Gordon theory.

  1. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2000-01-01

    Cernavoda NPP Unit 1, the first nuclear power unit in Romania, has a long and tormented history. It represents a rather unique case in Eastern Europe. The project started well before 1989 (the construction phase lasted 17 years and generations were involved in its completion), but it is effectively based on western technology (Candu). Meanwhile, the national nuclear program underwent many changes, affecting the lives and careers of Romanian nuclear professionals. Finally, on December 2 nd 1996, the unit began its c ommercial operation , being operated at its nominal power rating of 706 MW e . It now provides a reliable source of electricity for Romanian economy, supplying to the national grid about 10% of the country's average annual demand. The paper reflects some aspects related to the shift of generations during the project's development, including the present stage. The operational performances achieved 'in service' by Cernavoda NPP Unit 1 up to the end of 1999 , are also presented. Reference to the electrical energy production, performance indicators, production costs, nuclear safety, radiation protection, radioactive wastes, nuclear fuel consumption and nuclear fuel performances are included. Comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. (authors)

  2. Superfund record of decision (EPA Region 3), Westinghouse Elevator Company Plant, Operable Unit 2, Cumberland Township, Adams County, Gettysburg, PA, March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This Record of Decision (ROD) presents the selected remedial action for Operable Unit 2 (Soils) at the Westinghouse Elevator Company Plant Site in Adams County, Pennsylvania. The selected remedy for the soils at the Westinghouse Elevator Plant is No Additional Action for this Operable Unit. The other alternatives evaluated would produce little or no environmental benefit at substantial cost.

  3. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  4. Safety Evaluation Report related to the full-term operating license for Millstone Nuclear Power Station, Unit No. 1 (Docket No. 50-245)

    International Nuclear Information System (INIS)

    1985-10-01

    The Safety Evaluation Report for the full-term operating license application filed by the Connecticut Light and Power Company, the Hartford Electric Light Company, Western Massachusetts Electric Company and the Millstone Point Company [(now known as Connecticut Light and Power Company (CL and P) and Western Massachusetts Electric Company (WMECO) having authority to possess Millstone-1, 2, and 3, and the Northeast Nuclear Energy Company (NNECO) as the responsible entity for operation of the facilities)] for Millstone Nuclear Power Station Unit 1 has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in the town of Waterford, Connecticut. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can continue to be operated without endangering the health and safety of the public

  5. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 18

    International Nuclear Information System (INIS)

    Tam, P.S.

    1995-10-01

    In June 1982, the Nuclear Regulatory Commission staff (NRC staff or staff) issued a Safety Evaluation Report, NUREG-0847, regarding the application by the Tennessee Valley Authority (TVA or the applicant) for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2. Each of the following sections and appendices of this supplement is numbered the same as the section or appendix of the SER that is being updated, and the discussions are supplementary to, and not in lieu of, the discussion in the SER, unless otherwise noted. Accordingly, Appendix A continues the chronology of the safety review. Appendix E lists principal contributors to this supplement. Appendix FF is added in this supplement. The other appendices are not changed by this supplement

  6. Note on the two inequivalent spin 1/2 baryon field operators

    International Nuclear Information System (INIS)

    Christos, G.A.

    1985-01-01

    There are two inequivalent spin 1/2 local baryon field operators that can be constructed from 3 quarks. A priori the Jsup(P)=1/2 + baryons can couple to any linear combination of these operators. We show however that the coupling of the 1/2 + baryons to these operators is determined by the value of the SU(3) ratio of F to D type peudoscalar-baryon couplings. The experimental value of this ratio implies, for example, that the proton couples strongly to (usup(T)Cγ 5 d)u and weakly to (usup(T)Cd)γ 5 u. This is of interest in QCD sum rule applications. (orig.)

  7. Final environmental statement related to the operation of Clinton Power Station, Unit No. 1. Docket No. 50-461

    International Nuclear Information System (INIS)

    1982-05-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Clinton Power Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and ridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to Lake Clinton and Salt Creek are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The hydrothermal analyses indicate that under certain meteorological conditions (1-in-50-year drought), the plant would have to be operated at reduced power levels in order to meet the thermal standards established by the Illinois Pollution Control Board Order PCB 81-82. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilties should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. Contentions associated with environmental issues accepted during the operating-license hearing are related to assessment of effects of low-level radiation. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of Clinton

  8. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  9. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  10. Rest lifetime evaluation and ageing management in NPP 'Kozloduy' unit 1-4

    International Nuclear Information System (INIS)

    Erve, M.; Heck, R.; Schmidt, J.; Daum, G.; Bataklieva, L.; Stoev, M.

    1999-01-01

    In 1992 as a result of an IAEA SRM review the 'WANO 6-month program' has been issued to improve operation, maintenance nad safety culture for the four WWER 440/230 units at the NPP 'Kozloduy' Siemens has awarded 3 contracts related to RTL evaluation of the main equipment, integrity of reactor pressure vessel and to the leak-before-break behaviour of the main piping od unit 2. It is pursuit an overall strategy that allows to: implement on the basis of RTL evaluation a long term ageing management program (AMAP) for Kozloduy's units 1-4 to assure their operation until the end of their design life; identify those components and equipment for which from the safety point of view urgent and immediate actions have to be performed; increase step by step the safety and reliability according to the Western standards and to internationally accepted safety culture; keep open the possibility of life extension as far as this would be technically feasible and acceptable and economically reasonable. Under the technical leadership of Siemens studies have been performed related to the subject of integrity and RTL, such as: reirradiation of RPV samples from Unit 1 and 2; evaluation of PV embrittlement of Unit 1; transfer of the results of LBB assessment of Unit 2 to Units 1, 3 and 4; transfer of results of RTL evaluation of Unit 2 to Units 1, 3 and 4; PTS analysis of RPV of Unit 1, 2,3 and 4. The main remarkable results are: no life-limiting mechanisms detected, requiring immediate actions, except for RPVs; residual lifetime determined for RPVs on reliable basis of advanced modern PTS analysis and sample testing; necessary activities in monitoring of ageing and in-service inspection clearly identified successful proof of lBB for main primary piping after slight modification of supports; international experts agreement reached (e.g. Risk Audit, successful IAEA experts meetings and OSART missions)

  11. Screening of Potential Remediation Methods for the 200-ZP-1 Operable Unit at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Nimmons, Michael J.; Johnson, Christian D.; Dresel, P EVAN.; Murray, Christopher J.

    2006-08-07

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-ZP-1 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final. The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers). COC with similar properties were grouped for the screening evaluation. The screening evaluation was conducted in two primary steps. The initial screening step evaluated potential remediation methods based on whether they can be effectively applied within the environmental setting of the 200-ZP-1 Operable Unit for the specified contaminants. In the second step, potential remediation methods were screened using scoping calculations to estimate the scale of infrastructure, overall quantities of reagents, and conceptual approach for applying the method for each defined grouping of COC. Based on these estimates, each method was screened with respect to effectiveness, implementability, and relative cost categories of the CERCLA feasibility study screening process defined in EPA guidance.

  12. Safety evaluation report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 10

    International Nuclear Information System (INIS)

    1986-09-01

    Supplement No. 10 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO), as applicants and owners for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the status of certain issues and action items that had not been resolved or completed at the time of publication of the Safety Evaluation Report and Supplements Nos. 1 through 9 to that report

  13. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 15

    International Nuclear Information System (INIS)

    Tam, P.S.

    1995-06-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), and Supplement No. 14 (December 1994) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  14. Trial operation of TVS-2 at Balakovo NPP. Analysis of results and further modernization

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Molchanov, V.; Pavlovichev, A.; Novikov, A.; Enin, A.

    2006-01-01

    In this report the more detailed specifications of TVS-2 considering modifications of separate units, and also the conditions and results of its operation at Balakovo NPP on the basis of three fuel loads are presented. Implementation of TVS-2 at power units of Balakovo NPP in the fuel cycle 3x350 eff. days has been started in 2003 and the reactor core full loading at Balakovo NPP, Unit 1 has been achieved in 2005. Considering positive operational experience of TVS-2 at Unit 1 implementation of TVS-2 by full make-ups has been started at other units of Balakovo NPP. The operational results confirm the predicted essential increasement in reliability of reactor scram, possibility of implementation of new design restrictions, which enable to form the fuel loading with small neutron leakage. Besides, the favorable results on performance of transport - technological procedures enabling to reduce time of PM has been obtained. On the basis of this structure the detailed project report of a new FA modification with lengthened fuel stack has been developed, the necessary calculational and experimental justifications have been performed, materials for obtaining a license to trial operation of the first lot of such fuel assemblies beginning from 2006 are being prepared

  15. Technical Specifications, Byron Station, Unit Nos. 1 and 2 (Docket Nos. STN 50-454 and STN 50-455). Appendix A to license No. NPF-37

    International Nuclear Information System (INIS)

    1985-02-01

    The Byron Station, Unit No. 1 and Unit No. 2 Technical Specifications were prepared by the US Nuclear Regulatory Commission to set forth the limits, operating conditions, and other requirements applicable to a nuclear reactor facility as set forth in Section 50.36 of 10 CFR Part 50 for the protection of the health and safety of the public. Specifications are presented for limiting conditions for operation for the reactor control system, power distribution limits, instrumentation, primary coolant circuit, ECCS, containment systems, plant systems, electrical power systems, refueling operations, radioactive effluents, and radiological environmental monitoring

  16. Safety measures for the main control board replacement project at Ikata units 1 and 2

    International Nuclear Information System (INIS)

    Hashimoto, Nozomu; Tada, Kenji

    2013-01-01

    When Units 1 and 2 of the Ikata Power Station underwent replacement of their main control boards, control cabinets, and associated equipment, it was necessary to remove all the control boards, cabinets, and cables from the control building including from the main control room. This meant the loss of operation and monitoring functions in the main control room and functions of control cabinets. To maintain the operation and monitoring functions required under plant shutdown conditions, temporary operation and monitoring equipment (i.e., temporary main control board) was installed in the temporary main control room. The advance preparations included a trial switching from the permanent to the temporary main control board to identify and address potential problems in advance. When the replacement work was underway, a work schedule sheet posted in the temporary and the permanent control rooms was used to prevent human errors caused by operators’ recognition errors. Monitoring and control signals were switched from the old boards to the temporary boards and from the temporary boards to the new boards at appropriate timings to ensure plant safety during the replacement operation. (author)

  17. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  18. Safety Evaluation Report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412). Supplement No. 2

    International Nuclear Information System (INIS)

    1986-08-01

    This report, Supplement No. 2 to the the Safety Evaluation Report for the application filed by the Duquesne Light Company, et al. (the applicant) for a license to operate the Beaver Valley Power Station Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time the Safety Evaluation Report was published

  19. Experience of Ko-Ri Unit 1 water chemistry

    International Nuclear Information System (INIS)

    Tae Il Lee

    1983-01-01

    The main focus is placed on operational experience in secondary system water chemistry (especially the steam generator) of the Ko-Ri nuclear power plant Unit 1, Republic of Korea, but primary side chemistry is also discussed. The major concern of secondary water chemistry in a PWR is that the condition of the steam generator be well maintained. Full flow deep bed condensate polishers have recently been installed and operation started in July 1982. Boric acid treatment of the steam generator was stopped and only the all volatile treatment method was used thereafter. A review of steam generator integrity, the chemistry control programme, secondary water quality, etc. is considered to be of great value regarding the operation of Unit 1 and future units now under startup testing or construction in the Republic of Korea. (author)

  20. Comments on spin operators and spin-polarization states of 2+1 fermions

    Energy Technology Data Exchange (ETDEWEB)

    Gavrilov, S.P.; Tomazelli, J.L. [Departamento Fisica e Quimica, UNESP, Campus de Guaratingueta (Brazil); Gitman, D.M. [Universidade de Sao Paulo, Instituto de Fisica, Caixa Postal 66318-CEP, Sao Paulo, S.P. (Brazil)

    2005-02-01

    In this brief article we discuss spin-polarization operators and spin-polarization states of 2+1 massive Dirac fermions and find a convenient representation by the help of 4-spinors for their description. We stress that in particular the use of such a representation allows us to introduce the conserved covariant spin operator in the 2+1 field theory. Another advantage of this representation is related to the pseudoclassical limit of the theory. Indeed, quantization of the pseudoclassical model of a spinning particle in 2+1 dimensions leads to the 4-spinor representation as the adequate realization of the operator algebra, where the corresponding operator of a first-class constraint, which cannot be gauged out by imposing the gauge condition, is just the covariant operator previously introduced in the quantum theory. (orig.)

  1. Eielson Air Force Base operable unit 2 and other areas record of decision

    International Nuclear Information System (INIS)

    Lewis, R.E.; Smith, R.M.

    1994-10-01

    This decision document presents the selected remedial actions and no action decisions for Operable Unit 2 (OU2) at Eielson Air Force Base (AFB), Alaska, chosen in accordance with state and federal regulations. This document also presents the decision that no further action is required for 21 other source areas at Eielson AFB. This decision is based on the administrative record file for this site. OU2 addresses sites contaminated by leaks and spills of fuels. Soils contaminated with petroleum products occur at or near the source of contamination. Contaminated subsurface soil and groundwater occur in plumes on the top of a shallow groundwater table that fluctuates seasonally. These sites pose a risk to human health and the environment because of ingestion, inhalation, and dermal contact with contaminated groundwater. The purpose of this response is to prevent current or future exposure to the contaminated groundwater, to reduce further contaminant migration into the groundwater, and to remediate groundwater

  2. Final report for the 1st ex-vessel neutron dosimetry installations and evaluations for Kori unit 2 reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Byoung Chul; Yoo, Choon Sung; Lee, Sam Lai; Chang, Kee Ok; Gong, Un Sik; Choi, Kwon Jae; Chang, Jong Hwa; Lim, Nam Jin; Hong, Joon Wha; Cheon, Byeong Jin

    2006-11-15

    This report describes a neutron fluence assessment performed for the Kori unit 2 pressure vessel belt line region based on the guidance specified in regulatory guide 1.190. In this assessment, maximum fast neutron exposures expressed in terms of fast neutron fluence (E>1 MeV) and iron atom displacements (dpa) were established for the belt line region of the pressure vessel. During cycle 20 of reactor operation, an ex-vessel neutron dosimetry program was instituted at Kori unit 2 to provide continuous monitoring of the belt line region of the reactor vessel. The use of the ex-vessel neutron dosimetry program coupled with available surveillance capsule measurements provides a plant specific data base that enables the evaluation of the vessel exposure and the uncertainty associated with that exposure over the service life of the unit. Ex-vessel neutron dosimetry has been evaluated at the conclusion of cycle 20.

  3. Final Report of the 2nd Ex-Vessel Neutron Dosimetry Installation And Evaluations for Yonggwang Unit 1 Reactor Pressure Vessel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Byoung Chul; Yoo, Choon Sung; Lee, Sam Lai; Gong, Un Sik; Choi, Kwon Jae; Chung, Kyoung Ki; Kim, Kwan Hyun; Chang, Jong Hwa; Ha, Jea Ju

    2008-01-15

    This report describes a neutron fluence assessment performed for the Kori Unit 2 pressure vessel belt line region based on the guidance specified in Regulatory Guide 1.190. In this assessment, maximum fast neutron exposures expressed in terms of fast neutron fluence (E>1 MeV) and iron atom displacements (dpa) were established for the belt line region of the pressure vessel. During Cycle 21 of reactor operation, an Ex-Vessel Neutron Dosimetry Program was instituted at Kori Unit 2 to provide continuous monitoring of the belt line region of the reactor vessel. The use of the Ex-Vessel Neutron Dosimetry Program coupled with available surveillance capsule measurements provides a plant specific data base that enables the evaluation of the vessel exposure and the uncertainty associated with that exposure over the service life of the unit. Ex-Vessel Neutron Dosimetry has been evaluated at the conclusion of Cycle 21.

  4. Periodical safety review of units 1 and 2 of PAKS NPP. Examples from summary report

    International Nuclear Information System (INIS)

    Hammar, K.

    1998-01-01

    On the basis of American practice of qualification and relevant IAEA recommendations detailed guidelines of the qualification procedure were developed and executed on the Units 1 and 2 of the Paks NPP. Periodic safety supervision will be performed by evaluation of the following reports to be submitted by NPP: real technical conditions of the facility; existing practice and proposals for equipment qualification; evaluation of the existing safety reports estimating their validity up to the plant lifetime; ageing and ageing management; procedures of operation, maintenance, supervision; organisation and administration; safety impact of human factor, training, education, qualification of personnel

  5. Final Report for the 1st Surveillance Test of the Reactor Pressure Vessel Material (Capsule 2) of Ulchin Nuclear Power Plant Unit 4

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Kee Ok; Kim, Byoung Chul; Lee, Sam Lai (and others)

    2007-04-15

    Surveillance testing for reactor vessel materials is performed in order to evaluate the irradiation embrittlement due to neutrons during operation and set the condition of safe operation of nuclear reactor. The 1st surveillance testing was performed completely by Korea Atomic Energy Research Institute at Daejon after the capsule was transported from Ulchin site including its removal from reactor. Fast neutron fluences for capsules were calculated and various testing including mechanical and chemistry analysis were performed in order to evaluate the integrity of Ulchin Unit 4 reactor vessel during the operation until life time. The evaluation results are as follows; Fast neutron fluences for capsule 2 is 4.306E+18n/cm{sup 2}. The bias factor, the ratio of calculation/measurement, was 0.918 for the 1st testing and the calculational uncertainty,7.0% satisfied the requirement of USNRC Reg.Guide 1.190, 20%. The best estimated neutron fluence for reactor vessel inside surface was 3.615E+18n/cm{sup 2} based on the end of 6th fuel cycle and it was predicted that the fluences of vessel inside surface at 16 and 32EFPY would reach 8.478E+18 and 1.673E+19n/cm{sup 2} based on the current calculation. The result through this analysis for Ulchin Unit 4 showed that there would be no problem for the pressurized thermal shock(PTS) during the operation until design life.

  6. Final Report for the 1st Surveillance Test of the Reactor Pressure Vessel Material (CAPSULE 2) of Ulchin Nuclear Power Plant Unit 3

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Kee Ok; Kim, Byoung Chul; Lee, Sam Lai (and others)

    2006-12-15

    Surveillance testing for reactor vessel materials is performed in order to evaluate the irradiation embrittlement due to neutrons during operation and set the condition of safe operation of nuclear reactor. The 1st surveillance testing was performed completely by Korea Atomic Energy Research Institute at Taejon after the capsule was transported from Ulchin site including its removal from reactor. Fast neutron fluences for capsules were calculated and various testing including mechanical and chemistry analysis were performed in order to evaluate the integrity of Ulchin unit 3 reactor vessel during the operation until life time. The evaluation results are as follows; Fast neutron fluences for capsule 2 is 4.674E 18n/cm{sup 2}. The bias factor, the ratio of calculation/measurement, was 0.920 for the 1st testing and the calculational uncertainty,7.0% satisfied the requirement of USNRC Reg.Guide 1.190, 20%. The best estimated neutron fluence for reactor vessel inside surface was 3.913E 18n/cm{sup 2} based on the end of 6th fuel cycle and it was predicted that the fluences of vessel inside surface at 16 and 32EFPY would reach 9.249E 18 and 1.834E 19n/cm{sup 2} based on the current calculation. The result through this analysis for Ulchin unit 3 showed that there would be no problem for the pressurized thermal shock(PTS) during the operation until design life.

  7. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446). Supplement No. 7

    International Nuclear Information System (INIS)

    1985-01-01

    Supplement 7 to the Safety Evaluation Report for the Texas Utilities Electric Company application for a license to operate Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445, 50-446), located in Somervell County, Texas, has been jointly prepared by the Office of Nuclear Reactor Regulation and the Comanche Peak Technical Review of the US Nuclera Regulatory Commission. This supplement provides the results of the staff's evaluation and resolution of approximately 80 technical concerns and allegations in the areas of Electric/Instrumentation and Test Programs regarding construction and plant readiness testing practices at the Comanche Peak facility. Issues raised during Atomic Safety and Licensing Board hearings will be dealt with in future supplements to the Safety Evaluation Report

  8. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446). Supplement No. 8

    International Nuclear Information System (INIS)

    1985-02-01

    Supplement 8 to the Safety Evaluation Report for the Texas Utilities Electric Company application for a license to operate Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445, 50-446), located in Somervell County, Texas, has been jointly prepared by the Office of Nuclear Reactor Regulation and the Comanche Peak Technical Review Team of the US Nuclear Regulatory Commission. This Supplement provides the results of the staff's evaluation and resolution of approximately 80 technical concerns and allegations relating to civil and structural and miscellaneous issues regarding construction and plant readiness testing practices at the Comanche Peak facility. Issues raised during recent Atomic Safety and Licensing Board hearings will be dealt with in future supplements to the Safety Evaluation Report

  9. Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528, STN 50-529, and STN 50-530). Supplement No. 7

    International Nuclear Information System (INIS)

    1984-12-01

    Supplement No. 7 to the Safety Evaluation Report for the application filed by Arizona Public Service Company et al. for licenses to operate the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Docket Nos. STN 50-528/529/530), located in Maricopa County, Arizona, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation Report by providing an evaluation of: (1) additional information submitted by the applicant since Supplement No. 6 was issued; and (2) matters that the staff had under review when Supplement No. 6 was issued

  10. Final environmental statement related to operation of Indian Point Nuclear Generating Plant, Unit No. 3: (Docket No. 50-286): Volume 1

    International Nuclear Information System (INIS)

    1975-02-01

    The proposed action is the issuance of a license to consolidated Edison Company of New York, Inc., for the operation of the Indian Point Nuclear Generating Plant, Unit No. 3, located in the State of New York, Westchester County, Village of Buchanan, 24 miles north of the New York City boundary line. Although the present action is the issuance of an operating license for Unit No. 3, this Statement considers the environmental impacts from simultaneous operation of all three Units. A Final Environmental Statement has been issued for Unit No. 2. Furthermore, in view of the proximity to the Indian Point site of existing and presently proposed power plants on the Hudson River, the cumulative environmental benefits and impacts of the plants within a 30-mile reach of the river have been assessed. The proposed action is interreleated to other actions taken by other Federal agencies such as the Environmental Protection Agency, in regard to granting or denying application for discharge permits under the National Pollutant Discharge Elimination System (NPDES) instituted through the Federal Water Pollution Control Act Amendments of 1972, and the Federal Power Commission, in licensing of other facilities on the Hudson River. 128 figs., 210 tabs

  11. Safety Evaluation Report related to the operation of Nine Mile Point Nuclear Station, Unit No. 2 (Docket No. 50-410)

    International Nuclear Information System (INIS)

    1987-07-01

    This report supplements the Safety Evaluation Report (NUREG-1047, February 1985) for the application filed by Niagara Mohawk Power Corporation, as applicant and co-owner, for the license to operate Nine Mile Point Nuclear Station, Unit 2 (Docket No. 50-410). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near Oswego, New York. This report supports the issuance of the full-power license for Nine Mile Point Nuclear Station, Unit No. 2

  12. Final Report of the 2nd Ex-Vessel Neutron Dosimetry Installation And Evaluations for Yonggwang Unit 1 Reactor Pressure Vessel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Byoung Chul; Yoo, Choon Sung; Lee, Sam Lai; Chang, Kee Ok; Gong, Un Sik; Choi, Kwon Jae; Chang, Jong Hwa; Li, Nam Jin; Hong, Joon Wha

    2007-01-15

    This report describes a neutron fluence assessment performed for the Yonggwang Unit 1 pressure vessel belt line region based on the guidance specified in Regulatory Guide 1.190. In this assessment, maximum fast neutron exposures expressed in terms of fast neutron fluence (E>1 MeV) and iron atom displacements (dpa) were established for the belt line region of the pressure vessel. During Cycle 16 of reactor operation, 2nd Ex-Vessel Neutron Dosimetry Program was instituted at Yonggwang Unit 1 to provide continuous monitoring of the belt line region of the reactor vessel. The use of the Ex-Vessel Neutron Dosimetry Program coupled with available surveillance capsule measurements provides a plant specific data base that enables the evaluation of the vessel exposure and the uncertainty associated with that exposure over the service life of the unit. Ex-Vessel Neutron Dosimetry has been evaluated at the conclusion of Cycle 16.

  13. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  14. Kozloduy nuclear power plant. Units 1-4. Status of safety improvements. Rev. 2

    International Nuclear Information System (INIS)

    1999-01-01

    operation of the units. The plant current safety level analysis has been performed using IAEA analytical methodology according to 50-SG-O12 standard 'Periodic safety review of operational nuclear power plants'. The approach and criteria for acceptable safety level definition, developed by IAEA and presented in INSAG-8 ' was used for analysis performance. Based on this analysis a set of activities was developed, to ensures further plant operation with the necessary safety level. The measures were combined in a program called Complex program for modernization of units 1-4. The implementation of the program is foreseen for a period of four next fuel cycles and started at the beginning of 1998. In respond to the requirements for the content of this paper a detailed description of the current status of resolving of the safety issues, classified by IAEA in TECDOC 640 is presented. The whole process of safety evaluation, short and long term safety improvements presents in a systematical manner the efforts of the Government of Bulgaria, NEK Ltd and KNPP to operate these units with due respect of their nuclear safety responsibility according to Nuclear Safety Convention signed at Vienna in 1994 and ratified by Bulgarian Parliament in 1995

  15. Safety evaluation report related to the operation of Enrico Fermi Atomic Power Plant, Unit No. 2. Docket No. 50-341

    International Nuclear Information System (INIS)

    1983-01-01

    Supplement No. 3 to the Safety Evaluation Report related to the operation of the Enrico Fermi Atomic Power Plant, Unit 2, provides the staff's evaluation of additional information submitted by the applicant regarding outstanding review issues identified in Supplement No. 2 to the Safety Evaluation Report, dated January 1982

  16. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  17. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446). Supplement No. 11

    International Nuclear Information System (INIS)

    1985-05-01

    Supplement 11 to the Safety Evaluation Report for the Texas Utilities Electric Company application for a license to operate Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445, 50-446), located in Somervell County, Texas, has been jointly prepared by the Office of Nuclear Reactor Regulation and the Comanche Peak Technical Review Team (TRT) of the US Nuclear Regulatory Commission (NRC) and is in two parts. Part 1 (Appendix 0) of this supplement provides the results of the TRT's evaluation of approximately 124 concerns and allegations relating specifically to quality assurance and quality control (QA/QC) issues regarding construction proctices at the Comanche Peak facility. Part 2 (Appendix P) contains an overall summary and conclusion of the QA/QC aspects of the NRC Technical Review Team efforts as reported in supplemental Safety Evaluation Report SERs 7, 8, 9, and 10. Since QA/QC issues are also contained in each of the other supplements, the TRT considered that such a summary and conclusion from all supplements was necessary for a complete TRT description of QA/QC activities at Comanche Peak

  18. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  19. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1990-01-01

    Supplement 22 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station, Units 1 and 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved at the time of publication of the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, and 21 to that report. This supplement also includes the evaluations for licensing items resolved since Supplement 21 was issued. Supplement 5 has been cancelled. Supplements 7 through 11 were limited to the staff evaluation of allegations investigated by the NRC Technical Review Team. Supplement 13 presented the staff's evaluation of the Comanche Peak Response Team (CPRT) Program Plan, which was formulated by the applicant to resolve various construction and design issues raised by sources external to the applicant. Supplements 14 through 20 presented the staff's evaluation of the applicant's Corrective Action Program and CPRT activities. Items identified in Supplements 7, 8, 9, 10, 11, 13, 14, and 15 through 20 are not included in this supplement, except to the extent that they affect the applicant's Final Safety Analysis Report. 154 refs., 24 figs., 8 tabs

  20. Safety evaluation report related to the operation of Nine Mile Point Nuclear Station, Unit No. 2 (Docket No. 50-410)

    International Nuclear Information System (INIS)

    1986-07-01

    This report supplements the Safety Evaluation Report (NUREG-1047, February 1985) for the application filed by Niagara Mohawk Power Corporation, as applicant and co-owner, for a license to operate the Nine Mile Point Nuclear Station, Unit No. 2 (Docket No. 50-410). It has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near Oswego, New York. Supplement 1 to the Safety Evaluation Report was published in June 1985 and contained the report from the Advisory Committee on Reactor Safeguards as well as the resolution to a number of outstanding issues from the Safety Evaluation Report. Supplement 2 was published in November 1985 and contained the resolution to a number of outstanding and confirmatory issues. Subject to favorable resolution of the issues discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  1. Description of work vadose drilling at the 1301-N and 1325-N facilities, 100-NR-1 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This description of work (DOW) details the field activities associated with the sampling of the vadose zone soils beneath the 1301-N and 1325-N cribs and trenches and will serve as a field guide for those performing the work. These activities are undertaken pursuant to the Hanford Federal Facility Agreement and Consent Order (Ecology et al., 1994a) Milestone M-16-94-01H-Tl and the June 30, 1994 Milestone Change Request M-16-94-02 (Ecology et al., 1994b). Three vadose zone borings, 1301-N-1, 1301-N-2, and 1325-N-1, will be constructed to investigate the vertical and horizontal distribution of radionuclide contamination in sediments beneath the cribs and trenches. The boreholes are also intended to intersect subsurface areas that may have been contaminated by dangerous wastes, i.e., metals, in effluent disposed during past operation of the facilities. This limited field investigation will provide data for the evaluation of remedial alternatives. Data from the investigation are expected to confirm that the cribs and trenches are high priority sites in the 100-NR-1 operable unit. Data, from the investigation will be used to evaluate alternatives for closure of the 1301-N and 1325-N sites. The contaminants of potential concern (COPCs) for the 1301-N/1325-N limited field investigation are presented in Table 1

  2. The trip status and the reduction countermeasure in Kori nuclear power plant unit 1 and 2

    International Nuclear Information System (INIS)

    Kim, Jung-Soo

    1991-01-01

    Nuclear power account for 36% of Korea's total electric capacity and provided over 50% of the net electric power supply by June 1991. These plants supply US with the cheapest and most stable electric supply available. However each units capacity is very large and a plant trip due to failure of a component or a human error has a great influence on the nations electric power supply and drastically decreases the reserve margin. This report will analyze the trip causes and measure the trip frequency from the first commercial operation of Kori unit 1 and 2 to the end of June 1991, reflect to the plant operation, management and facility modification, etc. This will minimize the number of trips or urgent power reductions and thus contribute to an increase in plant capacity factor and safety, and stabilize the electric power demand and supply. The safety and the economy of nuclear power plant have to be secured and raised respectably by increasing the capacity factor. Since the prevention of trips plays an important role in the plant safety and economy, we have to do our best to prevent the unexpected trip

  3. Safety evaluation report related to the operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket Nos. 50-327 and 50-328, Tennessee Valley Authority. Supplement No. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-08-01

    The purpose of this supplement is to further update the Safety Evaluation Report by providing (1) our evaluation of additional information submitted by the licensee since the issuance of Supplement No. 1 to the Safety Evaluation Report, (2) our evaluation and status of the Non-TMI-2 outstanding issues identified in Part I of SER Supplement No. 1, (3) our evaluation of TMI-2 requirements which must be completed prior to the issuance of a full-power operating license, (4) our evaluation of dated requirements which the licensee must implement by the dates identified in NUREG-0694, TMI-Related Requirements for New Operating Licenses, and (5) our evaluation of additional information for those sections of the Safety Evaluation Report where further discussion or changes are in order.

  4. Safety evaluation report related to the operation of Sequoyah Nuclear Plant, Units 1 and 2, Docket Nos. 50-327 and 50-328, Tennessee Valley Authority. Supplement No. 2

    International Nuclear Information System (INIS)

    1980-08-01

    The purpose of this supplement is to further update the Safety Evaluation Report by providing (1) our evaluation of additional information submitted by the licensee since the issuance of Supplement No. 1 to the Safety Evaluation Report, (2) our evaluation and status of the Non-TMI-2 outstanding issues identified in Part I of SER Supplement No. 1, (3) our evaluation of TMI-2 requirements which must be completed prior to the issuance of a full-power operating license, (4) our evaluation of dated requirements which the licensee must implement by the dates identified in NUREG-0694, TMI-Related Requirements for New Operating Licenses, and (5) our evaluation of additional information for those sections of the Safety Evaluation Report where further discussion or changes are in order

  5. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Directory of Open Access Journals (Sweden)

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  6. Limited field investigation report for the 100-FR-1 Operable Unit

    International Nuclear Information System (INIS)

    1995-09-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-FR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. An LFI is required when existing data are insufficient to formulate a conceptual model and perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify contaminant- and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose an unacceptable risk that warrants action through IRM. The final decision to conduct an IRM will rely on many factors including risk, ARAR, future land use, point of compliance, time of compliance, a bias-for-action, and the threat to human health and the environment

  7. Safety evaluation report related to the operation of Palo Verde nuclear generating station, Units 1, 2, and 3. Docket Nos. STN 50-528, STN 50-529, and STN 50-530, Arizona Public Service Company

    International Nuclear Information System (INIS)

    1982-05-01

    On November 13, 1981, the Nuclear Regulatory Commission (NRC) staff issued its Safety Evaluation Report (SER) relating to the application for licenses to operate the Palo Verde Nuclear Generating Station, Unit Nos. 1, 2 and 3 (PVNGS 1-3); Supplement No. 1 to the SER was issued on February 4, 1982. In the SER and Supplement No. 1, the staff identified certain issues where either further information was required of the applicant or additional staff effort was necessary to complete the review of the application. The purpose of this supplement is to update the SER by providing (1) the evaluation of additional information submitted by the applicant since Supplement No. 1 to the SER was issued, and (2) the evaluation of the matters that the staff had under review and Supplement No. 1 was issued

  8. Pre-commissioning activities of exchange units of Heavy Water Plant, Manuguru (Paper No. 1.2)

    International Nuclear Information System (INIS)

    Kamath, H.S.; Sikaria, R.P.

    1992-01-01

    Heavy Water Plant, Manuguru (HWPM) comprises of two exchange units where enrichment of deuterium from natural concentration to 15% concentration is achieved using dual temperature H 2 S-H 2 O exchange process in a three stage cascade. In each exchange unit an inventory of around 200 MT of H 2 S gas is required under normal operating pressure and a feed water flow rate of 450 MT/Hr is required to be maintained. In view of the large flow rates of H 2 S circulating gas, water, cooling water, steam etc., the lines sizes in exchange unit are quite large. Further, H 2 S gas being highly toxic and corrosive, extreme care is required in order to ensure integrity and leak tightness. While due care is taken in material selection, design, quality surveillance etc., during fabrication, certain additional measures are required to be taken during precommissioning of the systems handling H 2 S under pressure. This paper deals with the activities from completion of plant erection including hydrotesting of piping by the piping contractor to the stage of trial production run. (author)

  9. Reuse of discharged fuel in Bohunice-1,2 units

    International Nuclear Information System (INIS)

    Chrapciak, V.; Majercik, J.; Kacmar, M.

    2003-01-01

    During the reconstruction of Bohunice-1,2 units (1997 - 2001), their cycle lengths dropped to very short values. Because of 4-year limit to fuel residence time, refuelling with fresh 2.4 % enriched assemblies seemed to be a solution of the problem. The paper describes the implementation of a final decision to reuse 3.6 % enriched fuel discharged after 3-year irradiation in previous cycles. This decision led to a large-scale moving of discharged assemblies from spent fuel pools back to reactors (Authors)

  10. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1988-11-01

    Supplement 18 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the applicant's Corrective Action Program (CAP) related to the structural design of the heating, ventilation, and air conditioning (HVAC) systems. The scope and methodologies for the CAP workscope as summarized in Revision 0 to the HVAC project status report and as detailed in related documents referenced in this evaluation were developed to resolve the technical concerns identified in the HVAC area. The NRC staff concludes that the CAP workscope for the HVAC structural design provides a comprehensive program for resolving the associated technical concerns and its implementation ensures that the structural design of the HVAC systems at CPSES satisfies the applicable requirements of 10 CFR Part 50. 32 refs

  11. Technical Specifications, Braidwood Station, Unit Nos. 1 and 2 (Docket Nos. STN 50-456 and STN 50-457). Appendix ''A'' to License No. NPF-59

    International Nuclear Information System (INIS)

    1986-10-01

    Information is presented for Braidwood Station Unit Nos. 1 and 2 in the areas of: safety limits and limiting safety system settings; limiting conditions for operation and surveillance requirements; design features; and administrative controls

  12. Bruce Unit 2 lay-up engineering assessment

    International Nuclear Information System (INIS)

    Iley, D.

    1995-01-01

    The overall lay-up program initiated as a result of the strategic decision to shut down Bruce A unit 2 is briefly described as an introduction to the engineering assessment of the unit 2 systems. The assessment has identified the need to prepare 67 system and 9 equipment lay-up specifications. A summary of the selected system specifications is described. A complete summary and the specifications and the status of unit 2 systems and equipment required to support lay-up and/or the other three operating units is available on request due to the volume of the information. Some logistical details of the lay-up implementation plans, results, and problems to date demonstrate the complexity of the lay-up requirements for a nuclear unit in a multi-unit CANDU station. (author)

  13. Identification of Promising Remediation Technologies for Iodine in the UP-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vermeul, Vincent R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-09-01

    Iodine-129 (129I) generated at the U.S. Department of Energy (DOE) Hanford Site during plutonium production was released to the subsurface, resulting in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1 operable unit (OU). Because 129I is an uncommon contaminant, relevant remediation experience and scientific literature are limited, though work is under way to better understand the fate and transport of 129I in the environment and the effectiveness of potential remediation technologies. The recent UP-1 Evaluation Plan for Iodine and report on the Conceptual Model of Iodine Behavior in the Subsurface at the Hanford Site provide information on the history of contamination in the 200-UP-1 OU, relevant controlling processes (biological and geochemical), risk, the conceptual site model, and potential remedial options, which provided a foundation for this study. In this study, available information was compiled and used to categorize potential remediation technologies, culminating in a recommendation of promising technologies for further evaluation. Approaches to improve the technical information about promising technologies are also recommended in this study so that a subsequent evaluation of potential remediation alternatives can assess these technologies.

  14. Safety Evaluation Report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-10-01

    This Safety Evaluation Report on the application filed by Duquesne Light Company, as applicant and agent for the owners, for a license to operate the Beaver Valley Power Station Unit 2 (Docket No. 50-412) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Shippingport Borough, Beaver County, Pennsylvania, on the south bank of the Ohio River. Subject to the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  15. Application of modified version of SPPS-1 - HEXAB-2DB computer code package for operational analyses of fuel behaviour in WWER-440 reactors at Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kharalampieva, Ts; Stoyanova, I; Antonov, A; Simeonov, T [Kombinat Atomna Energetika, Kozloduj (Bulgaria); Petkov, P [Bylgarska Akademiya na Naukite, Sofia (Bulgaria). Inst. za Yadrena Izsledvaniya i Yadrena Energetika

    1994-12-31

    The modified version of SPPS-1 code called SPPS-1-HEXAB-2DB was applied for the purposes of the operational analysis and power peaking factors and reactor core critical parameters predictions of WWER-440s. The results of the calculations performed by the use of SPPS-1-HEXAB-2DB code and the corresponding parameters obtained from experiments at Kozloduy NPP WWER-440s as well as the results of fuel rod power distribution are presented. The method of operation simulation of reactor core with 349 assemblies (Unit 4) and with 313 fuel assemblies and 36 dummy fuel assemblies (Unit 1) is outlined. The modified code calculates not only fuel burnup and Pm-149 and Sm-149 concentrations distributions but also the space distribution of I-135 and Xe-135 concentrations. In this way it makes possible to perform the reactor operation simulation during the immediate periods after the reactor start-up or shut-down and to predict the critical reactor core parameters during transients. The results obtained show that SPPS-1-HEXAB-2DB code describes adequately the reactor core status. The new SPPS-1 code algorithm for estimation of assembly-wise power peaking factors distribution in reactor core is also described. The new code provides an option for checking the correctness of reactor core symmetry. The experience from the use of the modified SPPS-1-HEXAB-2DB code system confirms the provision of improved availability of operational analysis, prediction of Kozloduy NPP WWER-440s safe operations and fuel behaviour estimation. 14 tabs., 4 figs., 5 refs.

  16. Surface radiation survey and soil sampling of the 300-FF-1 operable unit, Hanford Site, southeastern Washington: A case study

    International Nuclear Information System (INIS)

    Teel, S.S.; Olsen, K.B.

    1990-10-01

    The methods used for conducting a radiological characterization of the soil surface for the Phase I Remedial Investigation of a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site is presented via a case study. The study site is an operable unit (300-FF-1) located in and adjacent to the 300 Area of the US Department of Energy's Hanford Site in southeastern Washington State. The operable unit contains liquid and solid waste disposal facilities associated with nuclear fuels fabrication. Continuous surface radiation surveying and soil sampling of selected locations were conducted. Contamination was found in several locations within the operable unit including areas near the liquid and solid waste disposal facilities. Instruments used during surveying included portable beta/gamma (P-11) detectors, and the Ultrasonic Ranging and Data System using an NaI (Tl) detector. Laboratory analyses results indicate that above-background radiation levels were primarily due to the presence of uranium. Both types of field instruments used in the study were effective in detecting surface contamination from radionuclides; however, each had specific advantages. Guidelines are presented for the optimum use of these instruments when performing a radiological characterization of the soil surface. 4 refs., 3 figs., 3 tabs

  17. Operation of Finnish nuclear power plants. Quarterly report, 1st quarter 1998

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1998-11-01

    Quarterly reports on the operation of Finnish NPPs describe events and observations relating to nuclear and radiation safety that the Radiation and Nuclear Safety Authority (STUK) considers safety significant. Safety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and the environment and tabulated data on the plants' production and load factors. The Finnish NPP units were in power operation for the whole first quarter of 1998. All the units were in long-term test operation at uprated power level authorised by STUK. The load factor average of the plant units was 100.8%. An oil leak at Olkiluoto NPP Unit 2 caused an ignition that was promptly extinguished. A subsequent appraisal of the event disclosed deficiencies in the functioning of the plant unit's operating organization and the event was classified INES level 1. Other events in this quarter had no bearing on nuclear or radiation safety. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  18. Inverse spectral results for Schroedinger operators on the unit interval with partial information given on the potentials

    International Nuclear Information System (INIS)

    Amour, L.; Raoux, T.; Faupin, J.

    2009-01-01

    We pursue the analysis of the Schroedinger operator on the unit interval in inverse spectral theory initiated in the work of Amour and Raoux [''Inverse spectral results for Schroedinger operators on the unit interval with potentials in Lp spaces,'' Inverse Probl. 23, 2367 (2007)]. While the potentials in the work of Amour and Raoux belong to L 1 with their difference in L p (1≤p k,1 spaces having their difference in W k,p , where 1≤p≤+∞, k(set-membership sign)(0,1,2). It is proved that two potentials in W k,1 ([0,1]) being equal on [a,1] are also equal on [0,1] if their difference belongs to W k,p ([0,a]) and if the number of their common eigenvalues is sufficiently high. Naturally, this number decreases as the parameter a decreases and as the parameters k and p increase

  19. Four years Re-Use of low burned fuel assemblies from units 1 and 2 in core loadings of units 3 and 4 WWER-440 at Kozloduy NPP

    International Nuclear Information System (INIS)

    Stoyanova, I.; Antov, A.; Spasova, V.

    2006-01-01

    At the end of 2002 units 1 and 2 of Kozloduy NPP were shutdown before their design life time which left a large number of assemblies yet with a significant energy resources. A decision to load these assemblies into the cores of Units 3 and 4 during the next 4 cycles has been taken. In 2003, 43 assemblies from Unit 1 cycle 23 rd and 55 assemblies from Unit 2 cycle 24 th are loaded in the cores of units 3 and 4 respectively. In 2004, new 49 assemblies from Unit 1 cycle 23rd and new 55 assemblies from Unit 2 cycle 24th are loaded in the cores of units 3 and 4 respectively. In 2005, the next new 25 assemblies from Unit 1 cycle 23 rd and 66 assemblies from Unit 2 cycle 24th are loaded in the cores of units 3 and 4 respectively. In 2006, the next new 54 assemblies from Unit 1 cycle 23 rd and 52 assemblies from Unit 2 cycle 24 th + 2 assemblies from Unit 3 cycle 19th are loaded in the cores of Units 3 and 4 respectively. The SPPSHB computer code system is used for development and safety assessment of the fuel loading patterns of Units 3 and 4 at Kozloduy NPP with low burned assemblies from units 1 and 2 (Authors)

  20. Safety Evaluation Report related to the operation of Shearon Harris Nuclear Power Plant, Unit No. 1 (Docket No. STN 50-400). Supplement No. 4

    International Nuclear Information System (INIS)

    1986-10-01

    This report, Supplement No. 4 to the Safety Evaluation Report for the application filed by the Carolina Power and Light Company and North Carolina Eastern Municipal Power Agency (the applicants) for a license to operate the Shearon Harris Nuclear Power Plant Unit 1 (Docket No. 50-400), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1, 2, and 3

  1. Safety Evaluation Report related to the operation of Shearon Harris Nuclear Power Plant, Unit No. 1 (Docket No. STN 50-400). Supplement No. 3

    International Nuclear Information System (INIS)

    1986-05-01

    This report, Supplement No. 3 to the Safety Evaluation Report for the application filed by the Carolina Power and Light Company and North Carolina Eastern Municipal Power Agency (the applicants) for a license to operate the Shearon Harris Nuclear Power Plant Unit 1 (Docket No. 50-400), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report and Supplement Nos. 1 and 2

  2. Path representation of su-hat (2){sub k} states I: Operators and particles for k=1,2

    Energy Technology Data Exchange (ETDEWEB)

    Lamy-Poirier, Joel, E-mail: jlamypoirier@perimeterinstitute.c [Departement de physique, de genie physique et d' optique, Universite Laval, Quebec, G1K 7P4 (Canada); Mathieu, Pierre, E-mail: pmathieu@phy.ulaval.c [Departement de physique, de genie physique et d' optique, Universite Laval, Quebec, G1K 7P4 (Canada)

    2011-04-11

    This is the first of two articles devoted to the analysis of the path description of the states in su-hat (2){sub k} WZW models, a representation well suited for constructive derivations of the fermionic characters. In this first article, the cases k=1,2 are treated in detail, emphasizing a different description in each case (operators vs particles). For k=1, we first prove, as a side result, the equivalence of two known path representations for the finitized su-hat (2){sub 1} states by displaying an explicit bijection. An immediate offshoot is the gain of a new and simple weighting for the (Kyoto) path representation that generalizes to level k. The bijection also suggests two operator constructions for the su-hat (2){sub 1} paths, a local and a nonlocal one, both interrelated. These are formal operators that map a path to another path, so that any path can be obtained by successive applications of these operators on a simple reference (ground-state) path. The nonlocal operator description is the starting point for a direct and elementary derivation of the su-hat (2){sub 1} spinon character. The second part presents an extensive study of the su-hat (2){sub 2} paths from their particle point of view, where the particles are defined as the path building blocks. The resulting generating functions appear to provide new (at least superficially) fermionic forms of the characters. In particular, a nice relationship between the sum of the j=0,1 characters at k=2 and the two ones at k=1 is unraveled.

  3. Final environmental statement related to the operation of H.B. Robinson Nuclear Steam-Electric Plant, Unit 2: (Docket No. 50-261)

    International Nuclear Information System (INIS)

    1975-04-01

    The proposed action is the continuation of Facility Operating License DPR-23 to Carolina Power and Light Company for H.B. Robinson Unit 2. Unit 2, located adjacent to Lake Robinson in Darlington County, near Hartsville, South Carolina, employs a pressurized water reactor to produce up to 2200 megawatts thermal (MWt). A steam turbine-generator uses this heat to provide 700 megawatts electric (MWe) of net electrical power capacity. A design power level of 2300 MWt (730 MWe) has been requested and is considered in the assessments contained in this statement. The exhaust steam is cooled by a flow of water obtained from the discharged to a 2250-acre cooling lake, Lake Robinson. Land areas disturbed during construction of the plant, but not used, have been seeded to native grasses, trees, and shrubs. Construction of a cooling water discharge canal extension resulted in alteration of about 100 acres of wildlife habitat. Subsequently, the canal banks were seeded with pines and legumes. Some erosion has taken place in the pine-seeded areas. Some small fish are killed by impingement on the water intake screens. Organisms passing through the screens very likely do not survive their passage through the circulating water system. Operation of the plant will cause an increase in the temperature of Black Creek below Lake Robinson. A small impact exists due to production and, after processing, disposal or release of sanitary and chemical wastes. Unit 2 may discharge up to 500 pounds/day of chemicals (primarily sulfates). Under conditions of low flow into and out of the lake, this increases the sulfate concentration in the lake by less than 1 ppM over the normal 7.7 ppM

  4. Dose rate evaluation of workers on the operation floor in Fukushima-Daiichi Unit 3

    Science.gov (United States)

    Matsushita, Kaoru; Kurosawa, Masahiko; Shirai, Keisuke; Matsuoka, Ippei; Mukaida, Naoki

    2017-09-01

    At Fukushima Daiichi Nuclear Power Plant Unit 3, installation of a fuel handling machine is planned to support the removal of spent fuel. The dose rates at the workplace were calculated based on the source distribution measured using a collimator in order to confirm that the dose rates on the operation floor were within a manageable range. It was confirmed that the accuracy of the source distribution was C/M = 1.0-2.4. These dose rates were then used to plan the work on the operation floor.

  5. Safety Evaluation Report related to the operation of Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441). Supplement No. 9

    International Nuclear Information System (INIS)

    1986-03-01

    Supplement No. 9 to the Safety Evaluation Report (NUREG-0887) on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group or CAPCO) for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 50-441), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Lake County, Ohio, approximately 35 miles northeast of Cleveland, Ohio. This supplement reports the staff's evaluation findings pertaining to the earthquake event that occurred in the vicinity of the Perry Nuclear Power Plant site on January 31, 1986, and is limited to that evaluation. Future supplemental reports will continue reporting on the status of new or unresolved issues since Supplement No. 8 was issued in January 1986

  6. Critical evaluation of the nonradiological environmental technical specifications. Volume 2. Surry Power Plants, Units 1 and 2

    International Nuclear Information System (INIS)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-01-01

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Units 1 and 2 of the Surry Nuclear Power Plant was carried out for the Office of Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected from 1973 through 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The two primary methods used for temperature monitoring employ a fixed thermographs network and boat measurements. Review of data indicates that both the application and formulation of the hydrothermal monitoring program are inadequate to fully characterize the operation of the plant and the behavior of the thermal plume. Furthermore, there are no existing data that can be used to adequately verify or disprove the validity of the various Surry plume predictions. The ecological analysis includes validation of impacts predicted in the Final Environmental Statement using the operational monitoring data. Phytoplankton cell concentrations, chlorophyll a, and carbon-14 measurements were used to monitor changes in the primary producers. Densities of consumers (i.e., zooplankton, benthos, and fish) were sed to monitor changes in the primary producers. Models based on operating data were constructed to determine whether changes were occurring at each trophic level. Analysis of the monitoring data suggests that the thermal discharges at Surry are having a negative effect on the phytoplankton and zooplankton but are enhancing the benthic and nekton populations in the discharge area

  7. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1997

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1997-12-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which STUK - Radiation and Nuclear Safety Authority considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. The Finnish nuclear power plant units were in power operation in the second quarter of 1997, except for the annual maintenance outages of Olkiluoto plant units and the Midsummer outage at Olkiluoto 2 due to reduced demand for electricity. There were also brief interruptions in power operation at the Olkiluoto plant units due to three reactor scrams. All plant units are undergoing long-term test operation at upgraded reactor power level which has been approved by STUK The load factor average of all plant units was 88.7 %. One event in the second quarter of 1997 was classified level 1 on the INES. The event in question was a scram at Olkiluoto 1 which was caused by erroneous opening of switches. Other events in this quarter were level 0. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  8. Auxiliary feedwater system risk-based inspection guide for the Beaver Valley, Units 1 and 2 nuclear power plants

    International Nuclear Information System (INIS)

    Lloyd, R.C.; Vehec, T.A.; Moffitt, N.E.; Gore, B.F.; Vo, T.V.; Rossbach, L.W.; Sena, P.P. III

    1993-02-01

    In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Beaver Valley Units 1 and 2 were selected as two of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at Beaver Valley Units 1 and 2

  9. Three years re-use of low burned fuel assemblies from units 1 and 2 in core loading of units 3 and 4 WWER-440 at Kozloduy NPP

    International Nuclear Information System (INIS)

    Stoyanova, I.; Antov, A.; Spasova, V.

    2006-01-01

    At the end of 2002 Units 1 and 2 of Kozloduy NPP were shutdown before the end of their designed lifetime. This left a large number of assemblies yet with a significant energy resource. In 2003, 43 assemblies from Unit 1 and 55 assemblies from Unit 2 are loaded in the cores of Units 3 and 4 respectively. In 2004, new 49 assemblies from Unit 1 and new 55 assemblies from Unit 2 are loaded in the cores of Units 3 and 4 respectively. In 2005, the next new 25 assemblies from Unit 1 and 66 assemblies from Unit 2 are loaded in the cores of Units 3 and 4 respectively. The realized core loadings of Units 3 and 4 are illustrated. The large number of low burned assemblies after the shut down of Units 1 and 2 and their utilization during 4 consecutive cycles in the cores of Units 3 and 4 both do not permit to obtain in the last 3 cycles the typical mean burn up 35-36 MWd/kg U of 3.6% discharged assemblies

  10. 78 FR 77726 - Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1

    Science.gov (United States)

    2013-12-24

    ... Three Mile Island Nuclear Station, Unit 1 AGENCY: Nuclear Regulatory Commission. ACTION: Exemption... License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station, Unit 1 (TMI-1... Facility Operating License No. DPR-50, which authorizes operation of the Three Mile Island Nuclear Station...

  11. On Point: The United States Army in Operation Iraqi Freedom

    Science.gov (United States)

    2004-01-01

    to retain operational context. Moreover, times noted in the text have been adjusted from Greenwich Mean Time (“ Zulu ”) to local Kuwait time (+ 3...TF 1-64 AR unit history is composed of short narratives for each subordinate unit. Most cite times in zulu . 34. Ibid. 35. Ibid. Numbers of enemy...places in the world. Inside the city cemetery is the Tomb of Ali, son-in-law and cousin to Mohammed and founder of the Shiite sect. Coalition leaders

  12. Operator performance on the night shift: phases 1 and 2

    International Nuclear Information System (INIS)

    Morisseau, Dolores; Beere, Barnaby; Collier, Steve

    1999-04-01

    The objective of the project on operator performance on the night shift is to determine the effects of circadian rhythms on higher order cognitive processes. The project had two preliminary phases. Subjects were operators from the Halden Boiling Water Reactor, (Phase 1: 7 male operators and shift leaders, aged 26 to 35; Phase 2: 8 male operators and shift leaders, aged 26 to 53). The majority of the operators were the same for both studies. The preliminary work established that Norwegian operators' circadian rhythms fall within universal population norms and, thus, they are suitable subjects for such experiments. During Phase 1, two self-assessment instruments, the Stanford Sleepiness Scale (SSS) and the Global Vigour and Affect Scale (GVA), were administered every hour on all three shifts at the reactor. During Phase 2, three tests from the Walter Reed Performance Assessment Battery were administered at the beginning, middle, and end of each of the three shifts at the reactor. The tests (Serial Add-Subtract, Two-Column Addition, and Logical Reasoning) were administered using a hand-held computer. Both phases were conducted during regular work shifts for one complete shift rota (six weeks). ANOVA with two repeated measures showed that self-reported sleepiness on the night shift, sleepiness with respect to hours into the shift, and the interaction between them all reached statistical significance at p<.001. Data analyses (ANOVA) from Phase 2 indicate that the main effect of SHIFTNO (morning, afternoon, evening) on response times was significant (p<.002); the interaction between SHIFTNO and TINSHIFT (hours into shift) was also significant (p<.009). None of the effects on correctness of response was significant (Phase 2). While correctness of response was not significant for routine cognitive measures, the significant, progressive slowing of response times on the night shift reinforces the concern for possible performance decrements on the night shift. Thus, it

  13. Safety-evaluation report related to the operation of Shoreham Nuclear Power Station, Unit No. 1 (Docket No. 50-322)

    International Nuclear Information System (INIS)

    1983-09-01

    Supplement 4 (SSER 4) to the Safety Evaluation Report on Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have been reviewed by the staff since the previous supplement was issued

  14. Safety evaluation report related to the operation of Shoreham Nuclear Power Station, Unit No. 1. Docket No. 50-322

    International Nuclear Information System (INIS)

    1983-02-01

    Supplement No. 3 to the Safety Evaluation Report of Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have come to light since the previous supplement was issued

  15. Safety Evaluation Report related to the operation of Shoreham Nuclear Power Station, Unit No. 1 (Docket No. 50-322)

    International Nuclear Information System (INIS)

    1989-04-01

    Supplement 10 (SSER 10) to the Safety Evaluation Report on Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have been reviewed by the staff since the previous supplement was issued

  16. Redundant filtration system of the fuel buildings,units 1 and 2 Almaraz NPP

    International Nuclear Information System (INIS)

    Lopez Tanco, J.

    2011-01-01

    The project redundant filtering fuel buildings in units 1 and 2 of Almaraz NPP, will compliance to the requirements established in the complementary technical instructions to the authorization of exploitation of Almaraz NPP, established by the CSN and will consist of the installation of a new filtration unit.

  17. Plant Outage Time Savings Provided by Subcritical Physics Testing at Vogtle Unit 2

    International Nuclear Information System (INIS)

    Cupp, Philip; Heibel, M.D.

    2006-01-01

    The most recent core reload design verification physics testing done at Southern Nuclear Company's (SNC) Vogtle Unit 2, performed prior to initial power operations in operating cycle 12, was successfully completed while the reactor was at least 1% ΔK/K subcritical. The testing program used was the first application of the Subcritical Physics Testing (SPT) program developed by the Westinghouse Electric Company LLC. The SPT program centers on the application of the Westinghouse Subcritical Rod Worth Measurement (SRWM) methodology that was developed in cooperation with the Vogtle Reactor Engineering staff. The SRWM methodology received U. S. Nuclear Regulatory Commission (NRC) approval in August of 2005. The first application of the SPT program occurred at Vogtle Unit 2 in October of 2005. The results of the core design verification measurements obtained during the SPT program demonstrated excellent agreement with prediction, demonstrating that the predicted core characteristics were in excellent agreement with the actual operating characteristics of the core. This paper presents an overview of the SPT Program used at Vogtle Unit 2 during operating cycle 12, and a discussion of the critical path outage time savings the SPT program is capable of providing. (authors)

  18. Summary revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce

    International Nuclear Information System (INIS)

    Sarvaic, I.; Miskolci, M.

    1998-01-01

    The document contents stage revaluation of energetic start-up of the unit 1 of nuclear power plant Mochovce. Test results of the stage of energetic start-up are summarized in the document, valuation of important systems and block devices as well as fulfilling the operation limits and conditions has been performed. On that base conclusions and recommendations for start-up the unit 2 and for commercial operation of the unit 1 are elaborated. The valuation has been elaborated by a scientific management for start-up nuclear power plant Mochovce of nuclear safety of nuclear power facilities. Scientific management for start-up of nuclear power plant Mochovce performed continuous valuation of individual power levels after ending of each individual level and it gave its valuation to energy power level with recommendations and conditions for further start-up process and operation. Scientific management finished its activity at the unit 1 of nuclear power plant Mochovce according to a statute of scientific management for start-up after successful completion of conclusive block run. Scientific management group was founded in February 1998 at nuclear power plant Mochovce. Its members are experts from Slovak, Czech, Russian and French organizations which are participating in power plant completion. Members are listed in a supplement No. 2

  19. Practical results of the MESA 1 line calcinator trial operation

    International Nuclear Information System (INIS)

    Napravnik, J.; Sazavsky, P.; Skaba, V.; Zahalka, F.; Vild, J.; Kulovany, J.

    1987-01-01

    Mobile calcination and cementation unit MESA 1 was designed and built by UJV Rez in cooperation with many enterprises, mainly with the Kralovopolske Strojirny Brno. This facility for direct fixation of liquid radioactive wastes was experimentally tested using model non-radioactive solutions and model and actual wastes from the Jaslovske Bohunice nuclear power plant. The calciner was run in trial operation at the Kralovopolske SAtrojirny Brno. A total of 1.3 m 3 of model solutions was processed into 180 kg of calcinate. The fixation of the calcinate in cement, the times of solidification and of hardening and the moisture content of concrete blocks were studied. The application was also tested of the calciner in drying ion exchangers from WWER-440 prior to their bituminization. Following the despatch of the cementation module to the Chernobyl nuclear power plant, the direct calcination module was tested at Dukovany together with an auxiliary module which makes possible self-contained calciner operation. Model non-radioactive solutions from the Dukovany nuclear power plant were treated containing H 3 BO 3 and NaNO 3 as main components. The usability in actual conditions of the mobile calcination and cementation unit for radioactive wastes was tested in a total of about 70 operating hours. (E.S.). 2 figs., 2 refs

  20. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1990-02-01

    Supplement 23 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and supplements 1, 2, 3, 4, 6, 12, 21, and 22 to that report were published. This supplement also includes the evaluations for licensing items resolved since Supplement 22 was issued. Supplement 5 has not been issued. Supplements 7, 8, 9, 10, and 11 were limited to the staff evaluation of allegations investigated by the NRC Technical Review Team. Supplement 13 presented the staff's evaluation of the Comanche Peak Response Team (CPRT) Program Plan, which was formulated by the applicant to resolve various construction and design issues raised by sources external to TU Electric. Supplements 14 through 19 presented the staff's evaluation of the CPSES Corrective Action Program: large- and small-bore piping and pipe supports (Supplement 14); cable trays and cable tray hangers (Supplement 15); conduit supports (Supplement 16); mechanical, civil/structural, electrical, instrumentation and controls, and systems portions of the heating, ventilation, and air conditioning (HVAC) system workscopes (Supplement 17); HVAC structural design (Supplement 18); and equipment qualification (Supplement 19). Supplement 20 presented the staff's evaluation of the Comanche Peak Response Team implementation of the CPRT Program

  1. Safety evaluation report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2. Dockets Nos. 50-416 and 50-417, Mississippi Power and Light Company; Middle South Energy, Inc., South Mississippi Electric Power Association

    International Nuclear Information System (INIS)

    1982-06-01

    Supplement 2 to the Safety Evaluation Report for Mississippi Power and Light Company, et. al, joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson, in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  2. Peer review of the Barselina Level 1 probabilistic safety assessment of the Ignalina Nuclear Power Plant, Unit 2

    International Nuclear Information System (INIS)

    McKay, S.L.; Coles, G.A.

    1995-01-01

    The Barselina Project is a Swedish-funded, cooperative effort among Lithuania, Russia and Sweden to transfer Western probabilistic safety assessment (PSA) methodology to the designers/operators of Ignalina Nuclear Power Plant (INPP). The overall goal is to use the PSA as a tool for assessing plant operational safety. The INPP is a two-unit, Former Soviet Union-designed nuclear facility located in Lithuania. The results of this PSA will ultimately be used to identify plant-specific improvements in system design and the conduct of facility operations, allowing improved operational safety. Pacific Northwest Laboratory (PNL) was asked to perform an independent expert peer review of the Barselina PSA. This report documents the findings of this review. This review, financed with nuclear safety assistance funds through the US Agency for International Development (USAID) and the US Department of Energy (DOE), satisfies Task II of the PNL peer review of the Barselina project. The objective is to provide an independent, in-proce ss examination of the Barselina Level 1 PSA of Ignalina Nuclear Power Plant, Unit 2. The review consisted of an investigation of the project documentation, interviews, and extensive discussions with the PSA staff during critical stages of the project. PNL assessed the readability, completeness, consistency, validity, and applicability of the PSA. The major aspects explored were its purpose, major assumptions, analysis/modeling, results, and interpretation. It was not within the scope of this review to perform plant walkdowns or to review material other than the PSA documentation

  3. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report No. 3

    International Nuclear Information System (INIS)

    1977-01-01

    After a month-by-month summary of operations and maintenance activities, data are presented concerning modifications, procedure changes, and man-rem radiation doses. Appendices include information on the main generator outage, leak rate testing, refueling outage, recirculation pump modifications, and instrument drift

  4. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  5. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  6. Economic evaluation of Kori and Wolsong Unit 1 plant life extension

    International Nuclear Information System (INIS)

    Song, T. H.; Jeong, I. S.

    2002-01-01

    24 years have been passed since Kori Unit 1 began its commercial operation, and 19 years have been passed since Wolsong Unit 1 began its commercial operation. As the end point of design life become closer, plant life extension and periodic safety assessment is paid more and more attention to by the utility company. In this paper, the methodologies and results of plant lifetime management economic evaluations of both units have been presented in comparison with Korean standard nuclear power plant 10, 20 and 30 year life extension cases respectively. In addition to that, sensitivity analysis and break even point analysis results are presented with the variables of capacity factor, operation and maintenance cost, and discount rate

  7. Cernavoda unit2 recirculated cooling water system transient analysis

    International Nuclear Information System (INIS)

    Nita, I. P.; Pancef, R.

    2015-01-01

    The paper is an approach to calculate the response of Cernavoda NPP Unit 2 RCW System to transient regimes during normal and abnormal regimes. Then one started to analyse the system response to reactor trip on class III and IV of power, LOCA on class IV of power, LOCA on class III power, LOIA on class IV of power, and LOIA on class III power. Moreover, one analysed the system transient due to requirement of changeover of a RCW operating pump, planned and unplanned changeover. This is the first transient approach to this system that took in consideration all building of the system, obtaining a very large system model, with over 900 pipe, 4 pumps, 50 consumers, 21 control valves. The changeover procedure was required to be analysed in order to change the nominal operating mode for Unit 2, from current 2 pumps in operation to 3 pump operations during summer operating mode. (authors)

  8. Safety evaluation report related to the operation of Shearon Harris Nuclear Power Plant, Unit No. 1 (Docket No. STN 50-400). Supplement No. 1

    International Nuclear Information System (INIS)

    1984-06-01

    This report, Supplement No. 1 to the Safety Evaluation Report for the application filed by the Carolina Power and Light Company and North Carolina Eastern Municipal Power Agency (the applicant) for license to operate the Shearon Harris Nuclear Power Plant Unit 1 (Docket No. 50-400), has been prepared by the Office of Nuclear Reactor Regulation of the U.S. Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  9. Centrifugal microfluidic platforms: advanced unit operations and applications.

    Science.gov (United States)

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-07

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  10. 40 CFR Appendix A to Part 76 - Phase I Affected Coal-Fired Utility Units With Group 1 or Cell Burner Boilers

    Science.gov (United States)

    2010-07-01

    ... Units With Group 1 or Cell Burner Boilers A Appendix A to Part 76 Protection of Environment... 1 or Cell Burner Boilers Table 1—Phase I Tangentially Fired Units State Plant Unit Operator ALABAMA... Vertically fired boiler. 2 Arch-fired boiler. Table 3—Phase I Cell Burner Technology Units State Plant Unit...

  11. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    After a summary of reactor operating experiences, data are presented concerning amendments to the operating licenses and technical specifications, changes, modifications, tests, experiments, and maintenance of safety-related equipment

  12. Technical evolution and operation of French CO2 cooled reactors (UNGG)

    International Nuclear Information System (INIS)

    Berthion, Y.

    1986-10-01

    The technical evolution of the five French CO 2 cooled reactors (UNGG) from 1981 to 1986 needs to be outlined. These technical evolutions concerned the fuel element of Bugey 1 which is now slightly enriched, as well as the load reduction operation required by the grid. In addition work in underway to increase the safety at the two St Laurent units, or to repair the hot steel upper-structures of Chinon-3 unit

  13. Tube structural integrity evaluation of Palo Verde Unit 1 steam generators for axial upper-bundle cracking

    International Nuclear Information System (INIS)

    Woodman, B.W.; Begley, J.A.; Brown, S.D.; Sweeney, K.; Radspinner, M.; Melton, M.

    1995-01-01

    The analysis of the issue of upper bundle axial ODSCC as it apples to steam generator tube structural integrity in Unit 1 at the Palo Verde Nuclear generating Station is presented in this study. Based on past inspection results for Units 2 and 3 at Palo Verde, the detection of secondary side stress corrosion cracks in the upper bundle region of Unit 1 may occur at some future date. The following discussion provides a description and analysis of the probability of axial ODSCC in Unit 1 leading to the exceedance of Regulatory Guide 1.121 structural limits. The probabilities of structural limit exceedance are estimated as function of run time using a conservative approach. The chosen approach models the historical development of cracks, crack growth, detection of cracks and subsequent removal from service and the initiation and growth of new cracks during a given cycle of operation. Past performance of all Palo Verde Units as well as the historical performance of other steam generators was considered in the development of cracking statistics for application to Unit 1. Data in the literature and Unit 2 pulled tube examination results were used to construct probability of detection curves for the detection of axial IGSCC/IGA using an MRPC (multi-frequency rotating panake coil) eddy current probe. Crack growth rates were estimated from Unit 2 eddy current inspection data combined with pulled tube examination results and data in the literature. A Monte-Carlo probabilistic model is developed to provide an overall assessment of the risk of Regulatory Guide exceedance during plant operation

  14. Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 1

    Science.gov (United States)

    1994-06-01

    units would be reused in the remedy. Contingency measures to be included in the remedy are potential metals removal prior to water end use, potential...onbase reuse of a portion of the water, and wellhead treatment on offbase supply wells. The contingency measures will only be implemented if necessary...94 LEGEND Ouatmar aluvi dposts agua Frmaion(cosoldatd aluval epoits W iead rdetilnsMhte omtin(neitccnlmeae ansoe9ndkeca F 70 Quvatei-lernayalvu e pk

  15. 76 FR 24538 - Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station...

    Science.gov (United States)

    2011-05-02

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-413 and 50-414; NRC-2011-0100; Docket Nos. 50-369 and 50-370; Docket Nos. 50-269, 50-270, and 50-287] Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; Oconee Nuclear Station, Units 1, 2, and 3...

  16. Safety Evaluation Report related to the operation of Nine Mile Point Nuclear Station, Unit No. 2 (Docket No. 50-410)

    International Nuclear Information System (INIS)

    1985-02-01

    The Safety Evaluation Report for the application filed by the Niagara Mohawk Power Corporation, as applicant and co-owner, for a license to operate the Nine Mile Point Nuclear Station, Unit 2 (Docket No. 50-410), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near Oswego, New York. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  17. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  18. Global Thermal Power Plants Database: Unit-Based CO2, SO2, NOX and PM2.5 Emissions in 2010

    Science.gov (United States)

    Tong, D.; Qiang, Z.; Davis, S. J.

    2016-12-01

    There are more than 30,000 thermal power plants now operating worldwide, reflecting a tremendously diverse infrastructure that includes units burning oil, natural gas, coal and biomass and ranging in capacity from 1GW. Although the electricity generated by this infrastructure is vital to economic activities across the world, it also produces more CO2 and air pollution emissions than any other industry sector. Here we present a new database of global thermal power-generating units and their emissions as of 2010, GPED (Global Power Emissions Database), including the detailed unit information of installed capacity, operation year, geographic location, fuel type and control measures for more than 70000 units. In this study, we have compiled, combined, and harmonized the available underlying data related to thermal power-generating units (e.g. eGRID of USA, CPED of China and published Indian power plants database), and then analyzed the generating capacity, capacity factor, fuel type, age, location, and installed pollution-control technology in order to determine those units with disproportionately high levels of emissions. In total, this work is of great importance for improving spatial distribution of global thermal power plants emissions and exploring their environmental impacts at global scale.

  19. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Jo, J.; Lin, C.C.; Neymotin, L. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6.

  20. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    International Nuclear Information System (INIS)

    Jo, J.; Lin, C.C.; Neymotin, L.

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6

  1. Matrix elements of a hyperbolic vector operator under SO(2,1)

    International Nuclear Information System (INIS)

    Zettili, N.; Boukahil, A.

    2003-01-01

    We deal here with the use of Wigner–Eckart type arguments to calculate the matrix elements of a hyperbolic vector operator V-vector by expressing them in terms of reduced matrix elements. In particular, we focus on calculating the matrix elements of this vector operator within the basis of the hyperbolic angular momentum T-vector whose components T-vector 1 , T-vector 2 , T-vector 3 satisfy an SO(2,1) Lie algebra. We show that the commutation rules between the components of V-vector and T-vector can be inferred from the algebra of ordinary angular momentum. We then show that, by analogy to the Wigner–Eckart theorem, we can calculate the matrix elements of V-vector within a representation where T-vector 2 and T-vector 3 are jointly diagonal. (author)

  2. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  3. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  4. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: 1 January--31 December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    The three reactors operated at near full power generating 17,622,500 MWH gross electrical power. There were 153 major power reductions including 50 scrams mostly caused by equipment failures. Data are presented concerning operations, modifications, occupational exposures, effluent activity, and waste disposal

  5. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  6. Denver Radium Site -- Operable Unit I closeout report for the US Environmental Protection Agency

    International Nuclear Information System (INIS)

    1992-08-01

    The Denver Radium Site consists of properties in the Denver, Colorado, area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 gaps or operable units to facilitate remedial action of the Site. Operable Unit I is an 8-acre block bounded by Quivas Street to the east, Shoshone Street to the west, West 12th Avenue to the south, and West 13th Avenue to the north. The primary focus of interest concerning investigations of radiological contamination was a radium, vanadium, and uranium processing facility at 1201 Quivas Street owned by the Pittsburgh Radium Company (PRC) from 1925 until 1926. The Radium Ores Company, which was associated with PRC, operated the facility until 1927. A Remedial investigation (RI) of Operable Unit I was prepared by Jacobs Engineering Group and CH 2 M Hill on behalf of EPA in April 1986. The draft Feasibility Study (FS), prepared by Jacobs Engineering Group and CH 2 M Hill, was issued in July 1987 (the final FS is the Community Relations Responsiveness Summary with an errata to the draft, issued September 1987). The RI focused on radium uranium processing residues discarded in the early 1900s. These residues contained uranium, radium, and thorium. EPA s Community Relations Plan involved the community in the decision-making process relating to the remedy to be implemented at Operable Unit X, and promoted communications among interested parties throughout the course of the project. The remedial action alternative preferred by EPA for Operable Unit I was Off-Site Permanent Disposal. Because a permanent disposal facility was not available at the time the Record of Decision was issued in September 1987, EPA selected the On-Site Temporary Containment (capping) with the Off-Site Permanent Disposal alternative

  7. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    International Nuclear Information System (INIS)

    Kmetyk, L.N.; Brown, T.D.

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP ampersand S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP ampersand S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP ampersand S configuration are given

  8. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Supporting MELCOR calculations, Volume 6, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Kmetyk, L.N.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States)

    1995-03-01

    To gain a better understanding of the risk significance of low power and shutdown modes of operation, the Office of Nuclear Regulatory Research at the NRC established programs to investigate the likelihood and severity of postulated accidents that could occur during low power and shutdown (LP&S) modes of operation at commercial nuclear power plants. To investigate the likelihood of severe core damage accidents during off power conditions, probabilistic risk assessments (PRAs) were performed for two nuclear plants: Unit 1 of the Grand Gulf Nuclear Station, which is a BWR-6 Mark III boiling water reactor (BWR), and Unit 1 of the Surry Power Station, which is a three-loop, subatmospheric, pressurized water reactor (PWR). The analysis of the BWR was conducted at Sandia National Laboratories while the analysis of the PWR was performed at Brookhaven National Laboratory. This multi-volume report presents and discusses the results of the BWR analysis. The subject of this part presents the deterministic code calculations, performed with the MELCOR code, that were used to support the development and quantification of the PRA models. The background for the work documented in this report is summarized, including how deterministic codes are used in PRAS, why the MELCOR code is used, what the capabilities and features of MELCOR are, and how the code has been used by others in the past. Brief descriptions of the Grand Gulf plant and its configuration during LP&S operation and of the MELCOR input model developed for the Grand Gulf plant in its LP&S configuration are given.

  9. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electric power generated in 1975 was 1,074,401 MW(e) with the generator on line 4,680.7 hrs. Information is presented concerning operations, maintenance, radioactive effluents and waste shipments, health physics, shutdowns, and personnel exposures

  10. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendices F-H, Volume 2, Part 4

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis

  11. Safety Evaluation Report related to the full-term operating license for Dresden Nuclear Power Station, Unit 2 ( Docket No. 50-237)

    International Nuclear Information System (INIS)

    1990-10-01

    The Safety Evaluation Report for the full-term operating license application filed by Commonwealth Edison Company for the Dresden Nuclear Power Station, Unit 2, has been prepared by the Office of Nuclear Regulation of the US Nuclear Regulatory Commission. The facility is located in Grundy County, Illinois. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can continue to be operated without endangering the health and safety of the public. 72 refs

  12. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-12-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... authorizes operation of the H.B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among...

  13. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  14. Sampling and analysis plan for remediation of Operable Unit 100-IU-3 waste site 600-104. Revision 1

    International Nuclear Information System (INIS)

    1997-08-01

    This sampling and analysis plan presents the rationale and strategy for the sampling and analysis activities to support remediation of 100-IU-3 Operable Unit waste site 600-104. The purpose of the proposed sampling and analysis activities is to demonstrate that time-critical remediation of the waste site for soil containing 2,4-Dichlorophenoxyacetic acid salts and esters (2,4-D) and dioxin/furan isomers at concentrations that exceed cleanup levels has been effective. This shall be accomplished by sampling various locations of the waste site before and after remediation, analyzing the samples, and comparing the results to action levels set by the Washington State Department of Ecology

  15. Bis{bis[1-methoxy-2-(2-methoxyethoxyethane-κ3O,O′,O′′]sodium} 1,1,2,2-tetraphenylethane-1,2-diide

    Directory of Open Access Journals (Sweden)

    Mikhail E. Minyaev

    2014-07-01

    Full Text Available Crystals of the title salt, [Na(C6H14O32]2(C26H20, were grown from a tetrahydrofuran/diglyme/Et2O solvent mixture [diglyme is 1-methoxy-2-(2-methoxyethoxyethane]. The cations and dianion are separated in the crystal structure, unlike in the other three structurally characterized dialkali metal tetraphenylethylene salts. The asymmetric unit contains one [Na(diglyme2]+ cation and one half of the [Ph2CCPh2]2− dianion. The latter lies on a twofold rotation axis. C—C bond-length redistribution displays that excessive electron density of the dianion is predominantly located at the C atoms of a former double bond and at all eight ortho positions. The studied crystal was a twin, with the ratio of two major components being 0.2143 (9:0.7857 (9. The twin operation is a twofold rotation around the a axis.

  16. Seismic upgrading of WWER 440-230 structures, units 1/2, Kozloduy NPP

    International Nuclear Information System (INIS)

    Stafanov, D.; Kostov, M.; Boncheva, H.; Varbanov, G.

    1995-01-01

    The purpose of this paper is to present final results from a big amount of computational work in connection with the investigations of the possibilities for upgrading of WWER 440-230 structures, units 1/2, Kozloduy NPP. (author)

  17. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  18. Qubits and quantum Hamiltonian computing performances for operating a digital Boolean 1/2-adder

    Science.gov (United States)

    Dridi, Ghassen; Faizy Namarvar, Omid; Joachim, Christian

    2018-04-01

    Quantum Boolean (1 + 1) digits 1/2-adders are designed with 3 qubits for the quantum computing (Qubits) and 4 quantum states for the quantum Hamiltonian computing (QHC) approaches. Detailed analytical solutions are provided to analyse the time operation of those different 1/2-adder gates. QHC is more robust to noise than Qubits and requires about the same amount of energy for running its 1/2-adder logical operations. QHC is faster in time than Qubits but its logical output measurement takes longer.

  19. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1990-04-01

    Supplement 24 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, and 23 to that report were published. This supplement also includes the evaluations for licensing items resolved since Supplement 23 was issued. Supplement 5 has not been issued. Supplements 7, 8, 9, 10, and 11 were limited to the staff evaluation of allegations investigated by the NRC Technical Review Team. Supplement 13 represented the staff's evaluation of the Comanche Peak Response Team (CPRT) Program Plan, which was formulated by the applicant to resolve various construction and design issues raised by sources external to TU Electric. Supplements 14 through 19 presented the staff's evaluation of the CPSES Corrective Action Program: large- and small-bore piping and pipe supports (Supplement 14); cable trays and cable tray hangers (Supplement 15); conduit supports (Supplement 16); mechanical, civil/structural, electrical, instrumentation and controls, and systems portions of the heating, ventilation, and air conditioning (HVAC) system workscopes (Supplement 17); HVAC structural design (Supplement 18); and equipment qualification (Supplement 19). Supplement 20 presented the staff's evaluation of the CPRT implementation of its Program Plan and the issue-specific action plans, as well as the CPRT's investigations to determine the adequacy of various types of programs and hardware at CPSES

  20. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: Docket Nos. 50-445 and 50-446

    International Nuclear Information System (INIS)

    1988-07-01

    Supplement 15 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the applicant's Corrective Action Program (CAP) related to the design of cable trays and cable tray hangers. The scope and methodologies for the CAP workscope as summarized in Revision O to the cable tray and cable tray hanger project status report and as detailed in related documents referenced in this evaluation were developed to resolve various design issues raised by the Atomic Safety and Licensing Board (ASLB) the intervenor, Citizens Association for Sound Energy (CASE); the Comanche Peak Response Team (CPRT); CYGNA Energy Services (CYGNA); and the NRC staff. The NRC staff concludes that the CAP workscope for cable trays and cable tray hangers provides a comprehensive program for resolving the associated technical concerns identified by the ASLB, CASE, CPRT, CYGNA, and the NRC staff and its implementation ensures that the design of cable trays and cable tray hangers at CPSES satisfies the applicable requirements of 10 CFR Part 50

  1. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2 (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1988-03-01

    Supplement 14 to the Safety Evaluation Report related to the operation of the Comanche Peak Stam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somerville County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of the applicants' Corrective Action Program (CAP0 related to large ans small bore piping and pipe supports. The scope and methodologies for CAP workshop as summarized in revision O to the large and small bore piping project status reports and as detailed in related documents referenced in this evaluation were developed to resolve various design issues raised by the Atomic Safety and Licensing Board (ASLB);the intervenor, Citizens Association for Sound Energy (CASE);the Camanche Peak Response Team (CPRT);SYGNA Energy Services (CYGNA);and the NRC staff. The NRC staff concludes that the CAP workscopes for large and small bore piping provide a comprehensive program for resolving the associated technical concerns identified by the ASLB, CASE, CPRT, CYGNA, and the NRC staff and their implementation ensures that the design of large and small bore piping and pipe supports at CPSES satisfies the applicable requirements of 10 CFR 50

  2. Safety evaluation report related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: Docket No. 50-445 and 50-446

    International Nuclear Information System (INIS)

    1988-11-01

    Supplement 20 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Units 1 and 2 (NUREG-0797), has been prepared by the Office of Special Projects of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement presents the staff's evaluation of CPRT implementation of the Comanche Peak Response Team (CPRT) Program Plan and the issue-specific action plans (ISAPs), as well as the CPRT's investigations to determine the adequacy of various types of programs and hardware at CPSES. The results and conclusions of the CPRT activities are documented in a results report for each ISAP, a Collective Evaluation Report (CER), and a Collective Significance Report (CSR). This supplement also presents the staff's safety evaluation of TU Electric's root cause assessment of past CPSES design deficiencies and weaknesses. The NRC staff concludes that the CPRT has adequately implemented its investigative activities related to the design, construction, construction quality assurance/quality control, and testing at CPSES. The NRC staff further concludes that the CPRT evaluation of the results of its investigation is thorough and complete and its recommendations for corrective actions are sufficient to resolve identified deficiencies

  3. Configuration management and change control at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Gheorghiu, Virgil

    1998-01-01

    Effective configuration management requires that: 1. the design basis of station structures, systems, equipment and components be maintained at all times; 2. only accurate and approved technical, operational and maintenance information is available for performance of station activities; 3. correct operating manuals, flowsheets, operating sequences, operating task and training manuals are prepared and maintained currently. Design Engineering at Cernavoda NPP is primarily the responsibility of the Engineering Services Department supported if necessary by the Technical Unit. The key elements needed to achieve excellence in design engineering support for station operation, including design process and implementation of modification are investigated by answering the questions: 1. What is the station expectation for design change control?; 2. How is this provided?. Concerning design, the following aspects are stressed: Detailed Design Development; Design Verification; Design Change Implementation. The present design process is auditable and well documented. It consists of detailed design development, and design output documents such as applicable drawings, procurement specifications, installation and test requirement and the results of design and safety reviews. The design change implementation does not proceed until an Inspection Test Plan has been developed and approved as required. (author)

  4. ATLAS operations in the GridKa T1/T2 Cloud

    International Nuclear Information System (INIS)

    Duckeck, G; Serfon, C; Walker, R; Harenberg, T; Kalinin, S; Schultes, J; Kawamura, G; Leffhalm, K; Meyer, J; Nderitu, S; Olszewski, A; Petzold, A; Sundermann, J E

    2011-01-01

    The ATLAS GridKa cloud consists of the GridKa Tier1 centre and 12 Tier2 sites from five countries associated to it. Over the last years a well defined and tested operation model evolved. Several core cloud services need to be operated and closely monitored: distributed data management, involving data replication, deletion and consistency checks; support for ATLAS production activities, which includes Monte Carlo simulation, reprocessing and pilot factory operation; continuous checks of data availability and performance for user analysis; software installation and database setup. Of crucial importance is good communication between sites, operations team and ATLAS as well as efficient cloud level monitoring tools. The paper gives an overview of the operations model and ATLAS services within the cloud.

  5. Validation of Ulchin Units 1, 2 CONTEMPT Model Prior to the Production of EQ Envelope Curve

    International Nuclear Information System (INIS)

    Hwang, Su Hyun; Kim, Min Ki; Hong, Soon Joon; Lee, Byung Chul; Suh, Jeong Kwan; Lee, Jae Yong; Song, Dong Soo

    2010-01-01

    The Ulchin Units 1, 2 will be refurbished with RSG (Replacement of Steam Generator) and PU (Power Uprate). The current EQ (Environmental Qualification) envelope curve should be modified according to RSG and PU. The containment P/T (Pressure/Temperature) analysis in Ulchin Units 1, 2 FSAR was done using EDF computer program PAREO6. PAREO6 uses the same assumptions as the US NRC CONTEMPT program, and the results given by both programs are in good agreement. It is utilized to determine pressure and temperature variations in a PWR containment subsequent to a reactor coolant or secondary system pipe break. But PAREO6 cannot be available to the production of EQ envelope curve, so CONTEMPT code should be used instead of PAREO6. It is essential to validate the CONTEMPT OSG (Original Steam Generator) model prior to the production of EQ envelope curve considering RSG and PU. This study has been performed to validate the CONTEMPT model of Ulchin Units 1, 2 by comparing the CONTEMPT results with the PAERO6 results in Ulchin Units 1, 2 FSAR

  6. Validation of Ulchin Units 1, 2 CONTEMPT Model Prior to the Production of EQ Envelope Curve

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Su Hyun; Kim, Min Ki; Hong, Soon Joon; Lee, Byung Chul [FNC Technology Co., SNU, Seoul (Korea, Republic of); Suh, Jeong Kwan; Lee, Jae Yong; Song, Dong Soo [KEPCO Research Institute, Daejeon (Korea, Republic of)

    2010-10-15

    The Ulchin Units 1, 2 will be refurbished with RSG (Replacement of Steam Generator) and PU (Power Uprate). The current EQ (Environmental Qualification) envelope curve should be modified according to RSG and PU. The containment P/T (Pressure/Temperature) analysis in Ulchin Units 1, 2 FSAR was done using EDF computer program PAREO6. PAREO6 uses the same assumptions as the US NRC CONTEMPT program, and the results given by both programs are in good agreement. It is utilized to determine pressure and temperature variations in a PWR containment subsequent to a reactor coolant or secondary system pipe break. But PAREO6 cannot be available to the production of EQ envelope curve, so CONTEMPT code should be used instead of PAREO6. It is essential to validate the CONTEMPT OSG (Original Steam Generator) model prior to the production of EQ envelope curve considering RSG and PU. This study has been performed to validate the CONTEMPT model of Ulchin Units 1, 2 by comparing the CONTEMPT results with the PAERO6 results in Ulchin Units 1, 2 FSAR

  7. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, Tennessee Valley Authority. Supplement number 20

    International Nuclear Information System (INIS)

    1996-02-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), Supplement No. 15 (June 1995), Supplement No. 16 (September 1995), Supplement No. 17 (October 1995), Supplement No. 18 (October 1995), and Supplement No. 19 (November 1995) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the issues identified in the SER

  8. Safety evaluation report related to the operation of Clinton Power Station, Unit No. 1 (Docket No. 50-461)

    International Nuclear Information System (INIS)

    1987-03-01

    Supplement No. 8 to the Safety Evaluation Report on the application filed by Illinois Power Company, Soyland Power Cooperative, Inc., and Western Illinois Power Cooperative, Inc., as applicants and owners, for a license to operate the Clinton Power Station, Unit No. 1, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Harp Township, DeWitt County, Illinois. This supplement reports the status of items that have been resolved by the staff since Supplement No. 7 was issued

  9. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    International Nuclear Information System (INIS)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L.; Forester, J.; Johnson, J.

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively

  10. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

  11. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the

  12. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  13. Development of Neutronics Model for ShinKori Unit 1 Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Hong, JinHyuk; Lee, MyeongSoo; Lee, SeungHo; Suh, JungKwan; Hwang, DoHyun [KEPRI, Daejeon (Korea, Republic of)

    2008-05-15

    ShinKori-Unit 1 and 2 is being built in the Kori site which will be operated at 2815 MWt of thermal core power. The purpose of this paper is to report on the performance of the developed neutronics model of ShinKori Unit 1 and 2. Also this report includes the convenient tool (XS2R5) for processing the large quantity of information received from the DIT/ROCS model and generating cross-sections. The neutronics model is based on the NESTLE code inserted to RELAP5/MOD3 thermal-hydraulics analysis code which was funded as FY-93 LDRD Project 7201 and is running on the commercial simulator environment tool (the 3KeyMaster{sup TM} of the WSC). As some examples for the verification of the developed neutronics model, some figures are provided. The output of the developed neutronics model is in accord with the Preliminary Safety Analysis Report (PSAR) of the reference plant.

  14. Interim safety evaluation report related to operation of Enrico Fermi Atomic Power Plant, Unit 2, Detroit Edison Company

    International Nuclear Information System (INIS)

    1977-09-01

    This interim report summarizes the scope and results of the radiological safety review performed to date by the NRC staff with respect to the operating license phase for the Enrico Fermi Atomic Power Plant, Unit 2. The major effort was the review of the facility design and proposed operating procedures described in applicant's Final Safety Analysis Report. In the course of the review, several meetings were held with representatives of the applicant to discuss plant design, construction and proposed operation. Additional information was requested, which the applicant provided through Amendment 7 to the Final Safety Analysis Report. A chronology of the principal actions relating to the review of the application is attached as Appendix A to the report. The Final Safety Analysis Report and amendments thereto are available for public inspection at the Nuclear Regulatory Commission Public Document Room, 1717 H Street, N. W., Washington, D.C. and at Monroe County Library System, 3700 South Custer Road, Monroe, Michigan 48161

  15. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Analysis of core damage frequency from internal events for plant operational state 5 during a refueling outage. Internal events appendices K to M

    International Nuclear Information System (INIS)

    Forester, J.; Yakle, J.; Walsh, B.; Darby, J.; Whitehead, D.; Staple, B.; Brown, T.

    1994-07-01

    This report provides supporting documentation for various tasks associated with the performance of the probabilistic risk assessment for Plant Operational State 5 (approximately Cold Shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143. The report contains the following appendices: K - HEP Locator Files; L - Supporting Information for the Plant Damage State Analysis; M - Summary of Results from the Coarse Screening Analysis - Phase 1A

  16. A 1.5 GFLOPS Reciprocal Unit for Computer Graphics

    DEFF Research Database (Denmark)

    Nannarelli, Alberto; Rasmussen, Morten Sleth; Stuart, Matthias Bo

    2006-01-01

    The reciprocal operation 1/d is a frequent operation performed in graphics processors (GPUs). In this work, we present the design of a radix-16 reciprocal unit based on the algorithm combining the traditional digit-by-digit algorithm and the approximation of the reciprocal by one Newton-Raphson i...

  17. 100 Area source operable unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    In accordance with the Hanford Past-Practice Strategy (HPPS), a focused feasibility study (FFS) is performed for those waste sites which have been identified as candidates for interim remedial measures (IRM) based on information contained in applicable work plans and limited field investigations (LFI). The FFS process for the 100 Area source operable units will be conducted in two stages. This report, hereafter referred to as the Process Document, documents the first stage of the process. In this stage, IRM alternatives are developed and analyzed on the basis of waste site groups associated with the 100 Area source operable units. The second stage, site-specific evaluation of the IRM alternatives presented in this Process Document, is documented in a series of operable unit-specific reports. The objective of the FFS (this Process Document and subsequent operable unit-specific reports) is to provide decision makers with sufficient information to allow appropriate and timely selection of IRM for sites associated with the 100 Area source operable units. Accordingly, the following information is presented: a presentation of remedial action objectives; a description of 100 Area waste site groups and associated group profiles; a description of IRM alternatives; and detailed and comparative analyses of the IRM alternatives

  18. Inverse spectral results for Schrödinger operators on the unit interval with partial information given on the potentials

    Science.gov (United States)

    Amour, L.; Faupin, J.; Raoux, T.

    2009-03-01

    We pursue the analysis of the Schrödinger operator on the unit interval in inverse spectral theory initiated in the work of Amour and Raoux ["Inverse spectral results for Schrödinger operators on the unit interval with potentials in Lp spaces," Inverse Probl. 23, 2367 (2007)]. While the potentials in the work of Amour and Raoux belong to L1 with their difference in Lp (1≤p<∞), we consider here potentials in Wk,1 spaces having their difference in Wk,p, where 1≤p≤+∞, k ɛ{0,1,2}. It is proved that two potentials in Wk,1([0,1]) being equal on [a,1] are also equal on [0,1] if their difference belongs to Wk,p([0,a]) and if the number of their common eigenvalues is sufficiently high. Naturally, this number decreases as the parameter a decreases and as the parameters k and p increase.

  19. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  20. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)