WorldWideScience

Sample records for unit operational control

  1. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  2. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  3. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    International Nuclear Information System (INIS)

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  4. Advanced Transport Operating System (ATOPS) control display unit software description

    Science.gov (United States)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  5. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  6. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    International Nuclear Information System (INIS)

    Delacroix, C.

    1990-01-01

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized [fr

  7. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  8. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  9. Standard formatted data units-control authority operations

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to illustrate a Control Authority's (CA) possible operation. The document is an interpretation and expansion of the concept found in the CA Procedures Recommendation. The CA is described in terms of the functions it performs for the management and control of data descriptions (metadata). Functions pertaining to the organization of Member Agency Control Authority Offices (MACAOs) (e.g., creating and disbanding) are not discussed. The document also provides an illustrative operational view of a CA through scenarios describing interaction between those roles involved in collecting, controlling, and accessing registered metadata. The roles interacting with the CA are identified by their actions in requesting and responding to requests for metadata, and by the type of information exchanged. The scenarios and examples presented in this document are illustrative only. They represent possible interactions supported by either a manual or automated system. These scenarios identify requirements for an automated system. These requirements are expressed by identifying the information to be exchanged and the services that may be provided by a CA for that exchange.

  10. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  11. Hydraulic pressure control unit for control rod drive

    International Nuclear Information System (INIS)

    Watabe, Yukio.

    1990-01-01

    The pressure invention concerns a hydraulic pressure control unit for control rod drives in BWR type reactors. The space above a floating piston possessed by an accumulator and the housing of control rod drives are connected by means of a pipeline. The pipeline has a scram valve which is opened upon occurrence of reactor scram. A pump is disposed between the accumulator and the scram valve for communicating a discharge port to apply a high pressure water to the accumulator. According to the present invention, a control unit is disposed between the scram valve and the housing of the control rod drives in the hydraulic pressure control unit for maintaining the cross sectional area of the flow channel of the pipeline to a usual size when the pressure in a pressure vessel is under a rated operation pressure, while limiting the cross sectional area of the flow channel when the pressure is lower than that in the rated operation. Thus, whole insertion of the control rod substantially at a constant speed is enabled irrespective of the level of the pressure in the pressure vessel. (I.S.)

  12. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  13. Stability Analysis for Operation of DG Units in Smart Grids

    DEFF Research Database (Denmark)

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  14. MAS2-8 radar and digital control unit

    Science.gov (United States)

    Oberg, J. M.; Ulaby, F. T.

    1974-01-01

    The design of the MAS 2-8 (2 to 8 GHz microwave-active spectrometer), a ground-based sensor system, is presented. A major modification in 1974 to the MAS 2-8, that of a control subsystem to automate the data-taking operation, is the prime focus. The digital control unit automatically changes all system parameters except FM rate and records the return signal on paper tape. The overall system operation and a detailed discussion of the design and operation of the digital control unit are presented.

  15. A computer controlled tele-cobalt unit

    International Nuclear Information System (INIS)

    Brace, J.A.

    1982-01-01

    A computer controlled cobalt treatment unit was commissioned for treating patients in January 1980. Initially the controlling computer was a minicomputer, but now the control of the therapy unit is by a microcomputer. The treatment files, which specify the movement and configurations necessary to deliver the prescribed dose, are produced on the minicomputer and then transferred to the microcomputer using minitape cartridges. The actual treatment unit is based on a standard cobalt unit with a few additional features e.g. the drive motors can be controlled either by the computer or manually. Since the treatment unit is used for both manual and automatic treatments, the operational procedure under computer control is made to closely follow the manual procedure for a single field treatment. The necessary safety features which protect against human, hardware and software errors as well as the advantages and disadvantages of computer controlled radiotherapy are discussed

  16. Development of control system in abdominal operating ROV

    Directory of Open Access Journals (Sweden)

    ZHANG Weikang

    2017-03-01

    Full Text Available In order to satisfy all the requirements of Unmanned Underwater Vehicle(UUVrecovery tasks, a new type of abdominal operating Remote Operated Vehicle(ROV was developed. The abdominal operating ROV is different from the general ROV which works by a manipulator, as it completes the docking and recovery tasks of UUVs with its abdominal operating mechanism. In this paper, the system composition and principles of the abdominal operating ROV are presented. We then propose a framework for a control system in which the integrated industrial reinforced computer acts as a surface monitor unit, while the PC104 embedded industrial computer acts as the underwater master control unit and the other drive boards act as the driver unit. In addition, the dynamics model and a robust H-infinity controller for automatic orientation in the horizontal plane were designed and built. Single tests, system tests and underwater tests show that this control system has good real-time performance and reliability, and it can complete the recovery task of a UUV. The presented structure and algorithm could have reference significance to the control system development of mobile robots, drones, and biomimetic robot.

  17. The role of the control room operator

    International Nuclear Information System (INIS)

    Williams, M.C.

    A control room operator at an Ontario Hydro nuclear power plant operates a reactor-turbine unit according to approved procedures within imposed constraints to meet the objectives of the organization. A number of operating and administrative tasks make up this role. Control room operators spend approximately six percent of their time physically operating equipment exclusive of upset conditions, and another one percent operating in upset conditions. Testing occupies five percent of an operator's time. Operators must be trained to recognize the entire spectrum of inputs available to them and use them all effectively. Any change in system or unit state is always made according to an approved procedure. Extensive training is required; operators must be taught and pracised in what to do, and must know the reasons behind their actions. They are expected to memorize emergency procedures, to know when to consult operating procedures, and to have sufficient understanding and practice to perform these procedures reliably

  18. Environmental Control Unit Harness Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  19. Frequency Control for Island Operation of Bornholm Power System

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Zhao, Haoran

    2014-01-01

    the primary frequency control and the DG units are used to provide the secondary frequency control. As such, the proposed control scheme can strike a balance of the frequency control speed and the energy used from the BESS for the frequency control support. The real-time model of the Bornholm power system......This paper presents a coordinated control strategy of a battery energy storage system (BESS) and distributed generation (DG) units for the island operation of the Danish island of Bornholm. The Bornholm power system is able to transit from the grid connected operation with the Nordic power system...... to the isolated island operation. In order to ensure the secure island operation, the coordinated control of the BESS and the DG has been proposed to stabilize the frequency of the system after the transition to the island operation. In the proposed coordinate control scheme, the BESS is used to provide...

  20. A control approach for the operation of DG units under variations of interfacing impedance in grid-connected mode

    DEFF Research Database (Denmark)

    Hoseini, S. Kazem; Pouresmaeil, E.; Hosseinnia, S. H.

    2016-01-01

    . However, the converter-based DG interface is subjected to the unexpected uncertainties, which highly influence performance of control loop of DG unit and operation of interfaced converter. The interfacing impedance seen by interfaced VSC may considerably vary in power grid, and the stability of interfaced...... converter is highly sensitive to the impacts of this impedance changes; then, DG unit cannot inject appropriate currents. To deal with the instability problem, a control method based on fractional order active sliding mode is proposed in this paper, which is less sensitive to variations of interfacing...... impedance. A fractional sliding surface, which demonstrates the desired dynamics of system is developed and then, the controller is designed in two phases as sliding and reaching phases to keep the control loop stable. Stability issues of the control method are discussed in details and the conditions...

  1. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  2. Computer programme for operator support in primary frequency control of NPP Dukovany

    International Nuclear Information System (INIS)

    Kurka, J.; Petruzela, I.; Piroutek, Z.

    1996-01-01

    The computer programme for the control room operator support in the primary frequency control operation of the NPP Dukovany power unit is described. This operational mode has recently been implemented. Until now, the plant has been exclusively operated in the based-load mode at nominal power. The stability of the main unit parameters, unit power output and main steam header pressure, is the characteristic feature for this mode of operation of units with WWER 440 type of reactors. This does no more hold in the new mode in which these both principal parameters vary in dependency on the power network frequency changes. This fact, however, has an important impact on the activities of the control room operators. Therefore, to help them to adapt themselves easily and without unnecessary stresses to new conditions the regulatory body when licensing the new mode finally approved its implementation only if computerized operator support system would be installed in the control room. Such a computer program for the operator support has been recently developed in EGU Prague and has already been implemented into the unit information system on all four Dukovany units. (author). 3 refs, 7 figs

  3. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units

    International Nuclear Information System (INIS)

    Clausner, J.P.; Jorel, M.

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units

  4. A manned maneuvering unit proximity operations planning and flight guidance display and control system

    Science.gov (United States)

    Gershzohn, Gary R.; Sirko, Robert J.; Zimmerman, K.; Jones, A. D.

    1990-01-01

    This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display

  5. Analysis of the operator's tasks: An aid to control room design

    International Nuclear Information System (INIS)

    Blanc, P.; Guesnier, G.P.; Heilbronn, B.; Monnier, B.

    1983-01-01

    The control room designer usually has no knowledge of the tasks performed by the operator in the control room since an overall picture of the situation only becomes available once the whole facility has been constructed. In order to study and design control rooms for its future PWR units, Electricite de France (EDF) felt it was essential to analyse these tasks: the work was facilitated by the existence of 900 MW PWR units which were already in operation and which are controlled in much the same manner as future units of the same type. Accordingly, by analysing the control procedures of these 900 MW PWR units, a data base describing the control and monitoring tasks performed by operators in normal, incident and accident situations has been built up. The data-base files, which were established from a study of 130 control procedures, record all the commands given and data available in the control room (about 7000), describe the tasks connected with these commands and data, and identify the times at which they are made use of by the operator. Using this data base, the principle of operator-system communication and of data processing in the control room of the future has been established: in such a control room, most controls and data will be accessible through computer communication systems to ensure that control and monitoring systems are closely integrated under normal operating conditions as well as in incident and post-accident situations and to enable the plant to be controlled by one or two operators in a seated position. (author)

  6. Anticorrosion and halobios control for tidal power generating units

    International Nuclear Information System (INIS)

    Shen, J C; Ding, L X

    2012-01-01

    The anticorrosion and halobios control is the key techniquesrelated to the safety and durability of tidal power generating units. The technique of material application, antifouling coating and cathodic protection are often adopted. The technical research, application, updating and development are carried on Jiangxia Tidal Power Station, which is based on the old Unit 1-Unit 5 operated for nearly 30 years, and the new Unit 6 operated in 2007. It is found that stainless steeland the antifouling coating used in Unit 1- Unit 5 are very effective, but cathodic protection is often likely to fail because of the limitation of structure and installation. Analyses and studies for anticorrosion and halobios control techniques of tidal power generating units according to theory, experience and actual effects have been done, which can be for reference to the tidal power station designers and builders.

  7. 40 CFR 75.34 - Units with add-on emission controls.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Units with add-on emission controls... add-on emission controls. (a) The owner or operator of an affected unit equipped with add-on SO2 and... assurance/quality control program for the unit, required by section 1 in appendix B of this part. To provide...

  8. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Full text: Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which has occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  9. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which have occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  10. Substantiation of Structure of Adaptive Control Systems for Motor Units

    Science.gov (United States)

    Ovsyannikov, S. I.

    2018-05-01

    The article describes the development of new electronic control systems, in particular motor units, for small-sized agricultural equipment. Based on the analysis of traffic control systems, the main course of development of the conceptual designs of motor units has been defined. The systems aimed to control the course motion of the motor unit in automatic mode using the adaptive systems have been developed. The article presents structural models of the conceptual motor units based on electrically controlled systems by the operation of drive motors and adaptive systems that make the motor units completely automated.

  11. CNC Turning Center Advanced Operations. Computer Numerical Control Operator/Programmer. 444-332.

    Science.gov (United States)

    Skowronski, Steven D.; Tatum, Kenneth

    This student guide provides materials for a course designed to introduce the student to the operations and functions of a two-axis computer numerical control (CNC) turning center. The course consists of seven units. Unit 1 presents course expectations and syllabus, covers safety precautions, and describes the CNC turning center components, CNC…

  12. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  13. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  14. Control system for several rotating mirror camera synchronization operation

    Science.gov (United States)

    Liu, Ningwen; Wu, Yunfeng; Tan, Xianxiang; Lai, Guoji

    1997-05-01

    This paper introduces a single chip microcomputer control system for synchronization operation of several rotating mirror high-speed cameras. The system consists of four parts: the microcomputer control unit (including the synchronization part and precise measurement part and the time delay part), the shutter control unit, the motor driving unit and the high voltage pulse generator unit. The control system has been used to control the synchronization working process of the GSI cameras (driven by a motor) and FJZ-250 rotating mirror cameras (driven by a gas driven turbine). We have obtained the films of the same objective from different directions in different speed or in same speed.

  15. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping, surveying...

  16. Computer systems for the control of teletherapy units

    International Nuclear Information System (INIS)

    Brace, J.A.

    1985-01-01

    This paper describes a computer-controlled tracking cobalt unit installed at the Royal Free Hospital. It is based on a standard TEM MS90 unit and operates at 90-cm source-axis distance with a geometric field size of 45 x 45 cm at that distance. It has been modified so that it can be used either manually or under computer control. There are nine parameters that can be controlled positionally and two that can be controlled in rate mode; these are presented in a table

  17. The PAMELA storage and control unit

    International Nuclear Information System (INIS)

    Casolino, M.; Altamura, F.; Basili, A.; De Pascale, M.P.; Minori, M.; Nagni, M.; Picozza, P.; Sparvoli, R.; Adriani, O.; Papini, P.; Spillantini, P.; Castellini, G.; Boezio, M.

    2007-01-01

    The PAMELA Storage and Control Unit (PSCU) comprises a Central Processing Unit (CPU) and a Mass Memory (MM). The CPU of the experiment is based on a ERC-32 architecture (a SPARC v7 implementation) running a real time operating system (RTEMS). The main purpose of the CPU is to handle slow control, acquisition and store data on a 2 GB MM. Communications between PAMELA and the satellite are done via a 1553B bus. Data acquisition from the sub-detectors is performed via a 2 MB/s interface. Download from the PAMELA MM towards the satellite main storage unit is handled by a 16 MB/s bus. The maximum daily amount of data transmitted to ground is about 20 GB

  18. The PAMELA storage and control unit

    Energy Technology Data Exchange (ETDEWEB)

    Casolino, M. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy)]. E-mail: Marco.Casolino@roma2.infn.it; Altamura, F. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Basili, A. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); De Pascale, M.P. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Minori, M. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Nagni, M. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Picozza, P. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Sparvoli, R. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Adriani, O. [INFN, Structure of Florence, Physics Department, University of Florence, I-50019 Sesto Fiorentino (Italy); Papini, P. [INFN, Structure of Florence, Physics Department, University of Florence, I-50019 Sesto Fiorentino (Italy); Spillantini, P. [INFN, Structure of Florence, Physics Department, University of Florence, I-50019 Sesto Fiorentino (Italy); Castellini, G. [CNR-Istituto di Fisica Applicata ' Nello Carrara' , I-50127 Florence (Italy); Boezio, M. [INFN, Structure of Trieste, Physics Department, University of Trieste, I-34147 Trieste (Italy)

    2007-03-01

    The PAMELA Storage and Control Unit (PSCU) comprises a Central Processing Unit (CPU) and a Mass Memory (MM). The CPU of the experiment is based on a ERC-32 architecture (a SPARC v7 implementation) running a real time operating system (RTEMS). The main purpose of the CPU is to handle slow control, acquisition and store data on a 2 GB MM. Communications between PAMELA and the satellite are done via a 1553B bus. Data acquisition from the sub-detectors is performed via a 2 MB/s interface. Download from the PAMELA MM towards the satellite main storage unit is handled by a 16 MB/s bus. The maximum daily amount of data transmitted to ground is about 20 GB.

  19. Data collection on the unit control room simulator as a method of operator reliability analysis

    International Nuclear Information System (INIS)

    Holy, J.

    1998-01-01

    The report consists of the following chapters: (1) Probabilistic assessment of nuclear power plant operation safety and human factor reliability analysis; (2) Simulators and simulations as human reliability analysis tools; (3) DOE project for using the collection and analysis of data from the unit control room simulator in human factor reliability analysis at the Paks nuclear power plant; (4) General requirements for the organization of the simulator data collection project; (5) Full-scale simulator at the Nuclear Power Plants Research Institute in Trnava, Slovakia, used as a training means for operators of the Dukovany NPP; (6) Assessment of the feasibility of quantification of important human actions modelled within a PSA study by employing simulator data analysis; (7) Assessment of the feasibility of using the various exercise topics for the quantification of the PSA model; (8) Assessment of the feasibility of employing the simulator in the analysis of the individual factors affecting the operator's activity; and (9) Examples of application of statistical methods in the analysis of the human reliability factor. (P.A.)

  20. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  1. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  2. Control system design specification of advanced spent fuel management process units

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, S. H.; Kim, S. H.; Yoon, J. S

    2003-06-01

    In this study, the design specifications of instrumentation and control system for advanced spent fuel management process units are presented. The advanced spent fuel management process consists of several process units such as slitting device, dry pulverizing/mixing device, metallizer, etc. In this study, the control and operation characteristics of the advanced spent fuel management mockup process devices and the process devices developed in 2001 and 2002 are analysed. Also, a integral processing system of the unit process control signals is proposed, which the operation efficiency is improved. And a redundant PLC control system is constructed which the reliability is improved. A control scheme is proposed for the time delayed systems compensating the control performance degradation caused by time delay. The control system design specification is presented for the advanced spent fuel management process units. This design specifications can be effectively used for the detail design of the advanced spent fuel management process.

  3. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  4. Simple Multiplexing Hand-Held Control Unit

    Science.gov (United States)

    Hannaford, Blake

    1989-01-01

    Multiplexer consists of series of resistors, each shunted by single-pole, single-throw switch. User operates switches by pressing buttons or squeezing triggers. Prototype includes three switches operated successfully in over 200 hours of system operations. Number of switches accommodated determined by signal-to-noise ratio of current source, noise induced in control unit and cable, and number of bits in output of analog-to-digital converter. Because many computer-contolled robots have extra analog-to-digital channels, such multiplexer added at little extra cost.

  5. Automatic control unit for neutron transmission measurements

    Energy Technology Data Exchange (ETDEWEB)

    Adib, M.; Abdel-Kawy, A.; Eid, Y.; Ashry, A.; Mostafa, M.; Hamouda, I. (Atomic Energy Establishment, Inshas (Egypt). Reactor and Neutron Physics Dept.)

    1981-01-01

    An automatic transistorized unit has been designed to control the neutron transmission measurements carried out using the time-of-flight spectrometer. The function of the automatic unit is to control the measurements of the neutron counting rate distribution transmitted through a sample at a selected channel group of the time analyzer for a certain preadjusted time period. At the end of this time, the unit removes the sample out of the neutron beam, selects a second equal channel group of the time analyzer and provides the measurement of the neutron counting rate distribution for the same time period as in the case with the sample on. Such a measuring cycle can be repeated as much as the experiment requires. At the end of these cycles the stored information can be immediately obtained through the analyzer read out unit. It is found that the time of removing the sample out of the neutron beam or returning it back does not exceed 20 seconds instead of the five minutes required in case of manual operation. The most important advantages of using such an automatic unit are saving about 20 percent of the reactor operating time avoidng unnecessary radiation exposure of the experimentalists.

  6. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  7. Control principles for blackstart and island operation of microgrid

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, H.; Kauhaniemi, K. (University of Vaasa (Finland))

    2008-07-01

    In some unexpected situations a microgrid may become unstable after transition to islanded mode and all DG units must be disconnected from microgrid. In case of these events a restoration strategy for microgrid blackstart is needed. Also if the islanded microgrid is divided into different protection zones in case of a fault, fault management strategy with capability of very fast operation is needed to maintain stability in the healthy section of the islanded microgrid. The control of microgrid voltage and frequency during the microgrid blackstart is not possible without energy storage unit. In this paper sequence of actions for the microgrid blackstart operation as well as control principles of some DG units during blackstart are defined and simulated with two different microgrid configurations. Also one simulation case considering fault management strategy and control principles during fault in islanded microgrid is presented. Based on the simulations dimensioning principles for the needed energy storage and size of simultaneously controlled loads can be drawn. (orig.)

  8. Enhanced Master Controller Unit Tester

    Science.gov (United States)

    Benson, Patricia; Johnson, Yvette; Johnson, Brian; Williams, Philip; Burton, Geoffrey; McCoy, Anthony

    2007-01-01

    The Enhanced Master Controller Unit Tester (EMUT) software is a tool for development and testing of software for a master controller (MC) flight computer. The primary function of the EMUT software is to simulate interfaces between the MC computer and external analog and digital circuitry (including other computers) in a rack of equipment to be used in scientific experiments. The simulations span the range of nominal, off-nominal, and erroneous operational conditions, enabling the testing of MC software before all the equipment becomes available.

  9. Automatic exchange unit for control rod drive device

    International Nuclear Information System (INIS)

    Nasu, Seiji; Sasaki, Masayoshi.

    1982-01-01

    Purpose: To enable automatic reoperation and continuation without external power interruption remedy device at the time of recovering the interrupted power soruce during automatic positioning operation. Constitution: In case of an automatic exchange unit for a control rod drive device of the control type for setting the deviation between the positioning target position and the present position of the device to zero, the position data of the drive device of the positioning target value of the device is automatically read, and an interlock of operation inhibit is applied to a control system until the data reading is completed and automatic operation start or restart conditions are sequentially confirmed. After the confirmation, the interlock is released to start the automatic operation or reoperation. Accordingly, the automatic operation can be safely restarted and continued. (Yoshihara, H.)

  10. Smart house-based optimal operation of thermal unit commitment for a smart grid considering transmission constraints

    Science.gov (United States)

    Howlader, Harun Or Rashid; Matayoshi, Hidehito; Noorzad, Ahmad Samim; Muarapaz, Cirio Celestino; Senjyu, Tomonobu

    2018-05-01

    This paper presents a smart house-based power system for thermal unit commitment programme. The proposed power system consists of smart houses, renewable energy plants and conventional thermal units. The transmission constraints are considered for the proposed system. The generated power of the large capacity renewable energy plant leads to the violated transmission constraints in the thermal unit commitment programme, therefore, the transmission constraint should be considered. This paper focuses on the optimal operation of the thermal units incorporated with controllable loads such as Electrical Vehicle and Heat Pump water heater of the smart houses. The proposed method is compared with the power flow in thermal units operation without controllable loads and the optimal operation without the transmission constraints. Simulation results show the validation of the proposed method.

  11. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  12. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  13. Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

    Energy Technology Data Exchange (ETDEWEB)

    DiSalvo, Rick [Stoller LMS Team, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States); Surovchak, Scott [U.S. Department of Energy, Office of Legacy Management, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States); Spreng, Carl [Colorado Department of Public Health and Environment, 4300 Cherry Creek Dr. S, Denver, CO 80246-1530 (United States); Moritz, Vera [U.S. Environmental Protection Agency, Region 8, 1595 Wynkoop St., Denver, CO 80202-1129 (United States)

    2013-07-01

    Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plant (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)

  14. Control units for APS power supplies

    International Nuclear Information System (INIS)

    Despe, O.D.; Saunders, C.; McGhee, D.G.

    1993-01-01

    The Advanced Photon Source (APS) accelerator facility is made up of five major subsystems in addition to the linac: the positron accumulator ring (PAR), low energy transport (LET), booster synchrotron (SYNCH), high energy transport (HET), the storage ring (SR). Each subsystem has multiple magnet power supply combinations, some requiring multiple of operation. These magnet and power supply combinations computer controlled and monitored. The power supply control unit (PSCU) is the first layer of hardware and software above the power supply itself and is described in this paper. The description includes the basic philosophy for each of operation and how it influences the topology and of implementing control. The design of the analog reference blocks (ARBs) influenced the design of other custom functions well as the feedback controls for vibration and other dynamic corrections. The command set supported by the PSCU is discussed

  15. The role of heat pipes in intensified unit operations

    International Nuclear Information System (INIS)

    Reay, David; Harvey, Adam

    2013-01-01

    Heat pipes are heat transfer devices that rely, most commonly, on the evaporation and condensation of a working fluid contained within them, with passive pumping of the condensate back to the evaporator. They are sometimes referred to as ‘thermal superconductors’ because of their exceptionally high effective thermal conductivity (substantially higher than any metal). This, together with several other characteristics make them attractive to a range of intensified unit operations, particularly reactors. The majority of modern computers deploy heat pipes for cooling of the CPU. The application areas of heat pipes come within a number of broad groups, each of which describes a property of the heat pipe. The ones particularly relevant to chemical reactors are: i. Separation of heat source and sink. ii. Temperature flattening, or isothermalisation. iii. Temperature control. Chemical reactors, as a heat pipe application area, highlight the benefits of the heat pipe based on isothermalisation/temperature flattening device and on being a highly effective heat transfer unit. Temperature control, done passively, is also of relevance. Heat pipe technology offers a number of potential benefits to reactor performance and operation. The aim of increased yield of high purity, high added value chemicals means less waste and higher profitability. Other intensified unit operations, such as those employing sorption processes, can also profit from heat pipe technology. This paper describes several variants of heat pipe and the opportunities for their use in intensified plant, and will give some current examples. -- Highlights: ► Heat pipes – thermal superconductors – can lead to improved chemical reactor performance. ► Isothermalisation within a reactor vessel is an ideal application. ► The variable conductance heat pipe can control reaction temperatures within close limits. ► Heat pipes can be beneficial in intensified reactors

  16. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant, including decommissioning. (authors)

  17. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    Full text: This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant. (authors)

  18. Survey method for radiological surveys of 300 FF-1 Operable Unit soil and materials

    International Nuclear Information System (INIS)

    Greif, A.A.

    1997-06-01

    This technical basis document is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by the Radiological Control Technician to determine if excavated areas require continued remediation in accordance with the Record of Decision for the operable unit

  19. Design of master control unit for laboratory prototype of traction converter for locomotives

    OpenAIRE

    Žák, Jan; Peroutka, Zdeněk; Ovaska, Seppo J.

    2008-01-01

    This paper deals with the prototype of a main traction converter with medium-frequency transformer for AC trolley wire-fed locomotives. The attention is paid to the new master control and diagnostic unit. The designed master control unit has been implemented in the LabVIEW environment. Our master control unit ensures an effective human interface between a user and the control hardware. In this case, the master unit makes possible both extensive control and diagnostic operations of the laborat...

  20. Multivariable robust control of an air-handling unit: A comparison between pole-placement and H∞ controllers

    International Nuclear Information System (INIS)

    Moradi, Hamed; Bakhtiari-Nejad, Firooz; Saffar-Avval, Majid

    2012-01-01

    Highlights: ► Robust control of a multivariable air-handling unit (AHU). ► Controllers designed based on pole-placement and μ-synthesis. ► Robust performance in the presence of model uncertainties. ► Achievement of various tracking objectives in temperature and relative humidity. ► Comfort conditions in buildings with low energy consumption and operation cost. - Abstract: Control of air-conditioner units is essential to achieve satisfactory comfort conditions in buildings while keeping low energy consumption and operation costs. In this paper, a nonlinear multiinput and multioutput model (MIMO) of an air-handling unit (AHU) is considered. After linearization of the state equations around the operating points, an observer and a regulator are designed for the estimation of state variables and disturbance rejection, respectively. A realistic uncertain model is considered which constitutes various uncertainties associated with complex nonlinear model of AHU. In the presence of model uncertainties, a H ∞ -robust controller is designed to guarantee robust performance of the air-handling unit. In addition, a simple controller based on pole-placement approach is developed. Indoor temperature and relative humidity are controlled via manipulation of valve positions of air and cold water flow rates. Achievement of tracking objectives is investigated through various desired commands of indoor temperature and relative humidity (including a sequence of steps and ramps-steps). According to results, the H ∞ -robust controller guarantees the robust performance of the AHU in tracking of desired set-paths (while using the simple pole-placement controller leads to high oscillatory behavior of the output variables and control efforts). Moreover, using H ∞ -robust controller results in less energy consumption in comparison with the pole-placement controller.

  1. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  2. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  3. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  4. D0 HVAC System Heat Pump Controller Programming, Networking, and Operating Information

    International Nuclear Information System (INIS)

    Anderson, B.

    1999-01-01

    The purpose of this engineering note is to provide the necessary information to setup, program, and network the Electronic Systems USA Heat Pump Controller with the LON network card and Intellution Fix32 to operate properly within the HVAC system at D-Zero. The heat pump controllers are used for local temperature control of the office environments on the fifth and six floors of D-Zero. Heat pump units 1-6 are located in the ceiling of the sixth floor. Heat pump units 7-12 are found in the fifth floor ceiling. Heat pump unit 13 is in the Southeast corner of the fifth floor. Prior to installation the heat pump controller must be properly prepared to operate correctly in the HVAC system. Each heat pump unit must contain firmware (software) version 1.31 to operate properly on the network. Controllers with version 1.30 will not be able to communicate over the LON network. The manufacturer can only update the firmware version. Before installation a series of heat pump setpoints must be manually set using the Intelligent Stat. Connect the Intelligent Stat via the serial cable or wired connection.

  5. Design and Evaluation of a Fully Implantable Control Unit for Blood Pumps

    Science.gov (United States)

    Unthan, Kristin; Gräf, Felix; Laumen, Marco; Finocchiaro, Thomas; Sommer, Christoph; Lanmüller, Hermann; Steinseifer, Ulrich

    2015-01-01

    As the number of donor hearts is limited while more and more patients suffer from end stage biventricular heart failure, Total Artificial Hearts become a promising alternative to conventional treatment. While pneumatic devices sufficiently supply the patients with blood flow, the patient's quality of life is limited by the percutaneous pressure lines and the size of the external control unit. This paper describes the development of the control unit of the ReinHeart, a fully implantable Total Artificial Heart. General requirements for any implantable control unit are defined from a technical and medical point of view: necessity of a Transcutaneous Energy Transmission, autonomous operation, safety, geometry, and efficiency. Based on the requirements, a prototype is designed; it incorporates a LiFePo4 battery pack with charger, a rectifier for transcutaneous energy transmission, the motor's driver electronics, and a microcontroller which monitors and controls all functions. In validation tests, the control unit demonstrated a stable operation on TET and battery supply and a safe switching from one supply to the other. The overall mean efficiency is 14% on TET and 22% on battery supply. The control unit is suitable for chronic animal trials of the ReinHeart. PMID:26583095

  6. Technical evaluation of the electrical, instrumentation, and control design aspects of the proposed license amendment Revision 1 for single-loop operation of Browns Ferry Nuclear Plants (Docket No. 50-259, Unit 1; Docket No. 50-260, Unit 2; Docket No. 50-296, Unit 3)

    International Nuclear Information System (INIS)

    Donich, T.R.

    1983-01-01

    This report documents the technical evaluation of the proposed changes to the plant reactor protection system by the licensee of Browns Ferry Nuclear Power Station, Units 1, 2, and 3, to account for single-loop plant operation. This evaluation is restricted to only the electrical, instrumentation and control design aspects of proposed changes to the plant technical specifications for single-loop operation beyond 24 hours. Conclusion is that the license amendment for single-loop operation has met the review criteria provided sufficient administrative controls are in effect, and any anomalous control room indicators are corrected or warning-tagged for the duration of single-loop operation

  7. Block diagrams of the radar interface and control unit

    Science.gov (United States)

    Collier, J. W.

    1989-01-01

    The Interface and Control Unit is the heart of the radar module, which occupies one complex channel of the High-Speed Data Acquisition System of the Goldstone Solar System Radar. Block diagrams of the interface unit are presented as an aid to understanding its operation and interconnections to the rest of the radar module.

  8. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  9. American Joint Helicopter Command: Addressing a Lack of Operational Control of Rotary Assets

    National Research Council Canada - National Science Library

    Marsowicz, Brandon

    2007-01-01

    ... to achieve unity of effort. Based on the tenets of operational command and control by Milan Vego, across all services, the United States helicopter forces fare lacking operational command and control...

  10. Real-Time Analysis of an Active Distribution Network - Coordinated Frequency Control for Islanding Operation

    DEFF Research Database (Denmark)

    Cha, Seung-Tae

    distribution networks makes it possible to operate the distribution networks independently which is called islanding operation. However, it is a challenge to ensure secure and reliable operation of the islanded system due to a num-ber of reasons, e.g. low inertia in the islanded system, intermittency of some...... of the DERs, etc. Particularly during islanding operation, with relatively few DG units, the frequency and voltage control of the islanded system is not straightforward. DG units, specially based on renewable energy sources (RESs), i.e. wind and solar, have an inter-mittent nature and intrinsic...... system (BESS) and two secondary frequency control scenarios with BESS and DG units. During the island-ing transition, the frequency is regulated by the fast-acting primary control of the BESS. The secondary control of the main management system (MMS) detects the status of the BESS and tries to return...

  11. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  12. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  13. Multiagent-based Distributed Control for Operation Cost Minimization of Droop Controlled DC Microgrid Using Incremental Cost Consensus

    DEFF Research Database (Denmark)

    Li, Chendan; Quintero, Juan Carlos Vasquez; Guerrero, Josep M.

    2015-01-01

    In this paper, a multiagent based distributed control is proposed for DC microgrid to minimize the operation cost. The power of each distributed generator (DG) is dispatched in a distributed manner in a multiagent system by means of voltage scheduling. Every DG unit is taken as an agent......, and they share the load corresponding to the operation cost of all the units in the system with only communication with direct neighbors through incremental cost consensus. The power regulation according to the power reference generated by consensus is implemented through voltage scheduling in local primary...... controllers. Simulation verification shows that total operation cost of the DC microgrid is successfully reduced though the proposed method....

  14. Upgrading of Alum Preparation and Dosing Unit for Sharq Dijla Water Treatment Plant by Using Programmable Logic Controller System

    Directory of Open Access Journals (Sweden)

    Aumar Al-Nakeeb

    2018-02-01

    Full Text Available One of the important units in Sharq Dijla Water Treatment Plant (WTP first and second extensions are the alum solution preparation and dosing unit. The existing operation of this unit accomplished manually starting from unloading the powder alum in the preparation basin and ending by controlling the alum dosage addition through the dosing pumps to the flash mix chambers. Because of the modern trend of monitoring and control the automatic operation of WTPs due to the great benefits that could be gain from optimum equipment operation, reducing the operating costs and human errors. This study deals with how to transform the conventional operation to an automatic monitoring and controlling system depending on a Programmable Logic Controller (PLC and online sensors for alum preparation and dosing unit in Sharq Dijla WTP. PLC system will receive, analyze transmitting data, compare them with preset points then automatically orders the operational equipment (such as pumps, valves, and mixers in a way that guarantees the safe and appropriate operation of the unit. As a result of Process and Instrumentation Diagrams (PID that were prepared in this study, these units can be fully operating and manage by using Supervisory Control and Data Acquisition (SCADA system.

  15. Hardware interface unit for control of shuttle RMS vibrations

    Science.gov (United States)

    Lindsay, Thomas S.; Hansen, Joseph M.; Manouchehri, Davoud; Forouhar, Kamran

    1994-01-01

    Vibration of the Shuttle Remote Manipulator System (RMS) increases the time for task completion and reduces task safety for manipulator-assisted operations. If the dynamics of the manipulator and the payload can be physically isolated, performance should improve. Rockwell has developed a self contained hardware unit which interfaces between a manipulator arm and payload. The End Point Control Unit (EPCU) is built and is being tested at Rockwell and at the Langley/Marshall Coupled, Multibody Spacecraft Control Research Facility in NASA's Marshall Space Flight Center in Huntsville, Alabama.

  16. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  17. Off-Policy Reinforcement Learning: Optimal Operational Control for Two-Time-Scale Industrial Processes.

    Science.gov (United States)

    Li, Jinna; Kiumarsi, Bahare; Chai, Tianyou; Lewis, Frank L; Fan, Jialu

    2017-12-01

    Industrial flow lines are composed of unit processes operating on a fast time scale and performance measurements known as operational indices measured at a slower time scale. This paper presents a model-free optimal solution to a class of two time-scale industrial processes using off-policy reinforcement learning (RL). First, the lower-layer unit process control loop with a fast sampling period and the upper-layer operational index dynamics at a slow time scale are modeled. Second, a general optimal operational control problem is formulated to optimally prescribe the set-points for the unit industrial process. Then, a zero-sum game off-policy RL algorithm is developed to find the optimal set-points by using data measured in real-time. Finally, a simulation experiment is employed for an industrial flotation process to show the effectiveness of the proposed method.

  18. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  19. The US Air Force Aerial Spray Unit: a history of large area disease vector control operations, WWII through Katrina.

    Science.gov (United States)

    Breidenbaugh, Mark; Haagsma, Karl

    2008-01-01

    The US Air Force has had a long history of aerial applications of pesticides to fulfill a variety of missions, the most important being the protection of troops through the minimization of arthropod vectors capable of disease transmission. Beginning in World War II, aerial application of pesticides by the military has effectively controlled vector and nuisance pest populations in a variety of environments. Currently, the military aerial spray capability resides in the US Air Force Reserve (USAFR), which operates and maintains C-130 airplanes capable of a variety of missions, including ultra low volume applications for vector and nuisance pests, as well as higher volume aerial applications of herbicides and oil-spill dispersants. The USAFR aerial spray assets are the only such fixed-wing aerial spray assets within the Department of Defense. In addition to troop protection, the USAFR Aerial Spray Unit has participated in a number of humanitarian/relief missions, most recently in the response to the 2005 Hurricanes Katrina and Rita, which heavily damaged the Gulf Coasts of Louisiana, Mississippi, and Texas. This article provides historical background on the Air Force Aerial Spray Unit and describes the operations in Louisiana in the aftermath of Hurricane Katrina.

  20. Note: Wide-operating-range control for thermoelectric coolers

    Science.gov (United States)

    Peronio, P.; Labanca, I.; Ghioni, M.; Rech, I.

    2017-11-01

    A new algorithm for controlling the temperature of a thermoelectric cooler is proposed. Unlike a classic proportional-integral-derivative (PID) control, which computes the bias voltage from the temperature error, the proposed algorithm exploits the linear relation that exists between the cold side's temperature and the amount of heat that is removed per unit time. Since this control is based on an existing linear relation, it is insensitive to changes in the operating point that are instead crucial in classic PID control of a non-linear system.

  1. Actuator digital interface unit (AIU). [control units for space shuttle data system

    Science.gov (United States)

    1973-01-01

    Alternate versions of the actuator interface unit are presented. One alternate is a dual-failure immune configuration which feeds a look-and-switch dual-failure immune hydraulic system. The other alternate is a single-failure immune configuration which feeds a majority voting hydraulic system. Both systems communicate with the data bus through data terminals dedicated to each user subsystem. Both operational control data and configuration control information are processed in and out of the subsystem via the data terminal which yields the actuator interface subsystem, self-managing within its failure immunity capability.

  2. Control of xenon oscillations in large PWRs result of control in Mihama Unit No.3 Reactor

    International Nuclear Information System (INIS)

    Shimazu, Yoichiro; Itahara, Kuniyuki; Nishimura, Takeshi.

    1977-01-01

    Recently, constant axial offset control method for power distribution control is applied to PWRs (of Westinghouse type). In this mode of operation, Xe induced spatial oscillations which could cause the problem from the power distribution point of view hardly break out. Under special conditions such as tests, however, Xe oscillations can break out. It is required that power distribution can be controlled without any special operational actions. Several control methods for Xe oscillations have been reported through many theoretical studies and operational experiences. Among them is First Overtone Control Method. This requires quite a simple control action but can effectively control Xe oscillations. The authors have shown the effectiveness of First Overtone Control Method in Mihama Unit No. 3 Reactor. In this report the detailed procedures are described. The outline of Constant Axial Offset Control Method is described in Appendix. (auth.)

  3. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  4. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  5. Control system for a nuclear power producing unit

    International Nuclear Information System (INIS)

    Durrant, O.W.

    1978-01-01

    The invention provides in a control system for a nuclear power producing unit comprising a pressurized water reactor, a once-through steam generator provided with feedwater supply means, a turbine-generator supplied with steam from the steam generator and means maintaining a flow of pressurized water through the reactor and steam generator. The combination comprising; means generating a feed forward control signal proportional to the desired power output of the power producing unit, a second means for adjusting the reactor heat release, a third means for adjusting the rate of flow of feedwater to the steam generator, the second and third means solely responsive to and operated in parallel from the feed forward control signal whereby the reactor heat release and the rate of flow of feedwater to the steam generator are each maintained in a discrete functional relationship to the feed forward control signal

  6. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    Combat/operational stress control, defined as programs and policies to prevent, identify, and manage adverse combat/operational stress reactions, is the primary responsibility of military commanders...

  7. Backstepping-based nonlinear adaptive control for coal-fired utility boiler-turbine units

    International Nuclear Information System (INIS)

    Fang, Fang; Wei, Le

    2011-01-01

    The control system of boiler-turbine unit plays an important role in improving efficiency and reducing emissions of power generation unit. The nonlinear, coupling and uncertainty of the unit caused by varying working conditions should be fully considered during the control system design. This paper presents an efficient control scheme based on backstepping theory for improving load adaptability of boiler-turbines in wide operation range. The design process of the scheme includes model preprocessing, control Lyapunov functions selection, interlaced computation of adaptive control laws, etc. For simplification and accuracy, differential of steam pipe inlet pressure and integral terms of target errors are adopted. Also, to enhance practicality, implementation steps of the scheme are proposed. A practical nonlinear model of a 500 MW coal-fired boiler-turbine unit is used to test the efficiency of the proposed scheme in different conditions.

  8. Smart Inverter Control and Operation for Distributed Energy Resources

    Science.gov (United States)

    Tazay, Ahmad F.

    the microgrid as well as solve specific issues of connecting the microgrid to the system. A detailed procedure for controlling VSC and designing an optimal operation of the controller is also covered in the first part of the dissertation. This section provides an optimal operation for controlling motor drive and demonstrates issues when motor load exists at an autonomous microgrid. It also provides a solution for specific issues at operating a microgrid at autonomous mode as well as improving the structural design for the grid-tied microgrid. The solution for autonomous microgrid includes changing the operational state of the switching pattern of the smart inverter to solve the issue of a common mode voltage (CMV) that appears across the motor load. It also solves the issue of power supplying to large loads, such as induction motors. The last section of the low-level section involves an improvement of the performance and operation of the PV charging station for a plug-in hybrid electric vehicle (PHEV) at grid-tied mode. This section provides a novel structure and smart controller for PV charging station using three-phase hybrid boost converter topology. It also provides a form of applications of a multifunction smart inverter using PV charging station. The second part of the research is focusing on improving the performance of the microgrid by integrating several smart inverters to form a microgrid. It investigates the issue of connecting DER units with the microgrid at real applications. One of the common issues of the microgrid is the circulating current which is caused by poor reactive power sharing accuracy. When more than two DER units are connected in parallel, a microgrid is forming be generating required power for the load. When the microgrid is operated at autonomous mode, all DER units participate in generating voltage and frequency as well as share the load's power. This section provides a smart and novel controlling technique to solve the issue of unequal

  9. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    International Nuclear Information System (INIS)

    Brehm, D.M.

    1998-06-01

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  10. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  11. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Hong, Jaesic

    2016-11-15

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  12. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Hong, Jaesic

    2016-01-01

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  13. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  14. Implementation of a digital feedwater control system at Dresden Nuclear Power Plant, Units 2 and 3: Final report

    International Nuclear Information System (INIS)

    Zapotocky, A.; Popovic, J.R.; Fournier, R.D.

    1988-12-01

    This report describes the Digital Feedwater Control System Implementation at the Dresden 2 or 3 Units of the BWR Nuclear Power Plant owned by the Commonwealth Edison Company. The digital system has been operational in Unit 3 since August 1986, and in Unit 2 since April 1987. The Bailey Control's Network 90 based digital control system replaced the obsolete GE/MAC 5000 analog control system in the reactor feedwater control loop as a ''like-for-like'' replacement. Operational experience from the Digital Feedwater Control installations has been good and the system demonstrated better performance than the old analog systems. 14 refs., 15 figs., 17 tabs

  15. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  16. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  17. Control units for the system of unified modules for multi-channel analysis (SUMMA)

    International Nuclear Information System (INIS)

    Bushnin, Yu.B.; Denisenko, A.A.; Dunajtsev, A.F.

    1975-01-01

    The control units of the ''SUMMA'' system unified modules for multichannel analysis are described; the system is used in the experimental physics installations of the Institute of High-Energy Physics for operation on-line with an electronic computer (e.c.). The units allow control of several crates of electronic equipment (up to seven) according to a program from the internal program units or from the e.c. to be assured. The organization of the control is similar to the organization of the CAMAC electronic system. Examples of communication between the system and an NR2100 electronic computer are presented

  18. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  19. Combined operation of AC and DC distribution system with distributed generation units

    International Nuclear Information System (INIS)

    Noroozian, R.; Abedi, M.; Gharehpetian, G.

    2010-01-01

    This paper presents a DC distribution system which has been supplied by external AC systems as well as local DG units in order to demonstrate an overall solution to power quality issue. In this paper, the proposed operation method is demonstrated by simulation of power transfer between external AC systems, DG units, AC and DC loads. The power flow control in DC distribution system has been achieved by network converters and DG converters. Also, the mathematical model of the network, DG and load converters are obtained by using the average technique, which allows converter systems accurately simulated and control strategies for this converters is achieved. A suitable control strategy for network converters has been proposed that involves DC voltage droop regulator and novel instantaneous power regulation scheme. Also, a novel control technique has been proposed for DG converters. In this paper, a novel control system based on stationary and synchronously rotating reference frame has been proposed for load converters for supplying AC loads connected to the DC bus by balanced voltages. The several case studies have been studied based on proposed methods. The simulation results show that DC distribution systems including DG units can improve the power quality at the point of common coupling (PCC) in the power distribution system or industrial power system. (authors)

  20. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  1. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  2. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  3. Google Home: smart speaker as environmental control unit.

    Science.gov (United States)

    Noda, Kenichiro

    2017-08-23

    Environmental Control Units (ECU) are devices or a system that allows a person to control appliances in their home or work environment. Such system can be utilized by clients with physical and/or functional disability to enhance their ability to control their environment, to promote independence and improve their quality of life. Over the last several years, there have been an emergence of several inexpensive, commercially-available, voice activated smart speakers into the market such as Google Home and Amazon Echo. These smart speakers are equipped with far field microphone that supports voice recognition, and allows for complete hand-free operation for various purposes, including for playing music, for information retrieval, and most importantly, for environmental control. Clients with disability could utilize these features to turn the unit into a simple ECU that is completely voice activated and wirelessly connected to appliances. Smart speakers, with their ease of setup, low cost and versatility, may be a more affordable and accessible alternative to the traditional ECU. Implications for Rehabilitation Environmental Control Units (ECU) enable independence for physically and functionally disabled clients, and reduce burden and frequency of demands on carers. Traditional ECU can be costly and may require clients to learn specialized skills to use. Smart speakers have the potential to be used as a new-age ECU by overcoming these barriers, and can be used by a wider range of clients.

  4. Baseline groundwater model update for p-area groundwater operable unit, NBN

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States); Amidon, M. [Savannah River Site (SRS), Aiken, SC (United States)

    2015-09-01

    This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

  5. Units 3 and 4 steam generators new water level control system

    International Nuclear Information System (INIS)

    Dragoev, D.; Genov, St.

    2001-01-01

    The Steam Generator Water Level Control System is one of the most important for the normal operation systems, related to the safety and reliability of the units. The main upgrading objective for the SG level and SGWLC System modernization is to assure an automatic maintaining of the SG level within acceptable limits (below protections and interlocks) from 0% to 100% of the power in normal operation conditions and in case of transients followed by disturbances in the SG controlled parameters - level, steam flow, feedwater flow and/or pressure/temperature. To achieve this objective, the computerized controllers of new SG water level control system follows current computer control technology and is implemented together with replacement of the feedwater control valves and the needed I and C equipment. (author)

  6. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    drums and that of unit No. 3. Overhaul and inspection of new designs components, such as reactor internal pumps (RIPs), advanced type control rod drive mechanism (FMCRD) and large-capacity and high-efficiency turbine system, were conducted as planned, verifying their integrity after the commercial operation period. Operability during annual outage through ABWR-type main control room panels, which have a very new man-machine interface with touch-screen CRTs and flat displays, was also confirmed. In this paper, the commercial operation and annual outage experience of Kashiwazaki-Kariwa Nuclear Power Station units Nos. 6 and 7 are reported. (author)

  7. Operation control device for nuclear power plants

    International Nuclear Information System (INIS)

    Suto, Osamu.

    1982-01-01

    Purpose: To render the controlling functions of a central control console more centralized by constituting the operation controls for a nuclear power plant with computer systems having substantially independent functions such as those of plant monitor controls, reactor monitor management and CRT display and decreasing interactions between each of the systems. Constitution: An input/output device for the input of process data for a nuclear power plant and indication data for a plant control console is connected to a plant supervisory and control computer system and a display computer system, the plant supervisory control computer system and a reactor and management computer system are connected with a CRT display control device, a printer and a CRT display input/output device, and the display computer system is connected with the CRT display control device and the CRT display unit on the central control console, whereby process input can be processed and displayed at high speed. (Yoshino, Y.)

  8. Intelligent multi-unit disk controller

    International Nuclear Information System (INIS)

    Poirot, Lucien

    1982-01-01

    This controller has been designed as a link between a 16 bits minicomputer and two types of disks units interface: the SMD interface and an equivalent to the DRI unit interface. Four units of each type can be handled by the controller. A bit slice microprocessor controls the interface with the disks units. The maximum exchange rate is 8 megabits per second. A CRC feature has been provided for error detection. A 16 bits microprocessor implements the interface to the computer, assuring head positioning, the management of bad tracks, as well as the supervision of each transfer. A internal buffer memory allows an asynchronous dialogue with the computer. The implementation of the controller makes easy the adaptation to disks units of various types, and though it has been initially intended for a minicomputer of the MITRA type, its microprocessor based design makes it fitted to any minicomputer. (author) [fr

  9. Main problems experienced on diesel generators of French 900 MWe operating units

    Energy Technology Data Exchange (ETDEWEB)

    Dredemis, Geoffroy; Jude, Francois [Commissariat a l' Energie Atomique, centre d' Etudes Nucleaires de Fontenay-aux-Roses, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    Each unit of all the French nuclear power plant is equipped with two diesel emergency generator sets., For the totality of standards PWRs of 900 MWe, they are identical. We present in this communication the most significative failures met with diesel engines on operating units, such as rupture of fuel injection pipes, breaking of the connecting rods, and cylinder lubrication failures. All these incidents, which affected the emergency power sources of concerned units, had generic characteristics. In view of their potential consequences, it was proceeded in each case to an immediate control of the components concerned of all PWR 900 MWe diesel engines. At the same time, studies were started as to what modifications would permit to solve rapidly each one of the problems met with. (authors)

  10. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  11. Automatic generation control with thyristor controlled series compensator including superconducting magnetic energy storage units

    Directory of Open Access Journals (Sweden)

    Saroj Padhan

    2014-09-01

    Full Text Available In the present work, an attempt has been made to understand the dynamic performance of Automatic Generation Control (AGC of multi-area multi-units thermal–thermal power system with the consideration of Reheat turbine, Generation Rate Constraint (GRC and Time delay. Initially, the gains of the fuzzy PID controller are optimized using Differential Evolution (DE algorithm. The superiority of DE is demonstrated by comparing the results with Genetic Algorithm (GA. After that performance of Thyristor Controlled Series Compensator (TCSC has been investigated. Further, a TCSC is placed in the tie-line and Superconducting Magnetic Energy Storage (SMES units are considered in both areas. Finally, sensitivity analysis is performed by varying the system parameters and operating load conditions from their nominal values. It is observed that the optimum gains of the proposed controller need not be reset even if the system is subjected to wide variation in loading condition and system parameters.

  12. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  13. Centrifugal microfluidic platforms: advanced unit operations and applications.

    Science.gov (United States)

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-07

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  14. Control and Operation of Islanded Distribution System

    DEFF Research Database (Denmark)

    Mahat, Pukar

    deviation and real power shift. When a distribution system, with all its generators operating at maximum power, is islanded, the frequency will go down if the total load is more than the total generation. An under-frequency load shedding procedure for islanded distribution systems with DG unit(s) based...... states. Short circuit power also changes when some of the generators in the distribution system are disconnected. This may result in elongation of fault clearing time and hence disconnection of equipments (including generators) in the distribution system or unnecessary operation of protective devices...... operational challenges. But, on the other hand, it has also opened up some opportunities. One opportunity/challenge is an islanded operation of a distribution system with DG unit(s). Islanding is a situation in which a distribution system becomes electrically isolated from the remainder of the power system...

  15. Development of a system for automatic control and performance evaluation of shutoff units in HANARO

    International Nuclear Information System (INIS)

    Jeong, Y. H.; Joe, Y. G.; Choi, Y. S.; Woo, J. S.

    2003-01-01

    The function of the shutoff units is to rapidly insert the shutoff rod into the reactor core for safe shutdown of reactor. This paper describes the development of a system for automatic control and performance evaluation of shutoff units. The system automatically drives the shutoff unit with a specified operation cycle and records the performance of the drive mechanism in graphs and data. Also, it records the operating parameters of the shutoff unit and test facility. The characteristic of the developed system was evaluated to compare with that being use in the HANARO reactor. The system will be used for the performance and endurance tests in the test facility. Hereafter, the system will efficiently be used for the normal operation and the periodical drop performance tests of shutoff units in HANARO

  16. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context.

    Science.gov (United States)

    Lopez-Iturri, Peio; Aguirre, Erik; Trigo, Jesús Daniel; Astrain, José Javier; Azpilicueta, Leyre; Serrano, Luis; Villadangos, Jesús; Falcone, Francisco

    2018-01-29

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  17. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  18. New control and safety rod unit for the training reactor of the Dresden Technical University

    International Nuclear Information System (INIS)

    Adam, E.; Schab, J.; Knorr, J.

    1983-01-01

    The extension of the experimental training of students at the training reactor AKR of the Dresden Technical University requires the reconstruction of the reactor with a new control and safety rod unit. The specific conditions at the AKR led to a new variant. Results of preliminary experiments, design and mode of operation of the first unit as well as hitherto gained operation experiences are presented. (author)

  19. Improved operability of the CANDU 9 control centre

    International Nuclear Information System (INIS)

    Macbeth, M. J.; Webster, A.

    1996-01-01

    The next generation CANDU nuclear power plant being designed by AECL is the 900 MWe class CANDU 9 station. It is based upon the Darlington CANDU station design which is among the world leaders in capacity factor with low Operation, Maintenance and Administration (OM and A) costs. This Control Centre design includes the proven functionality of existing CANDU control centres (including the Wolsong 2,3, and 4 control centre improvements, such as the Emergency Core Cooling panels), the characteristics identified by systematic design with human factors analysis of operations requirements and the advanced features needed to improve station operability which is made possible by the application of new technology. The CANDU 9 Control Centre provides plant staff with an improved operability capability due to the combination of proveness, systematic design with human factors engineering and enhanced operating features. Significant features which contribute to this improved operability include: · Standard NSP, BOP and F/H panels with controls and indicators integrated by a standard display/presentation philosophy. · Common plant parameter signal database for extensive monitoring, checking, display and annunciation. · Powerful annunciation system allowing alarm filtering, prioritizing and interrogation to enhance staff recognition of events, plant state and required corrective procedural actions. · The use of an overview display to present immediate and uncomplicated plant status information to facilitate operator awareness of unit status in a highly readable and recognizable format. · Extensive cross checking of similar process parameters amongst themselves, with the counterpart safety system parameters and as well as with 'signature' values obtained from known steady state conditions. · Powerful calculation capabilities, using the plant wide database, providing immediate recognizable and readable and readable output data on plant state information and plant state change

  20. Study on the power control system for NPP power unit with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Aleksandrova, N.D.; Naumov, A.V.

    1981-01-01

    Results of model investigations into basic version of the power control systems (PCS) conformably to the WWER-440 NPP power unit are stated. Transient processes in the power unit system when being two PCS versions during perturbations of different parameters: unit power, vapour pressure or position of control rods have been simulated. Investigations into the different PCS versions show that quality of operation of a traditional scheme with a turbine power controller and reactor pressure controller can be significantly improved with the introduction of a high-speed signal of pressure into the reactor controller. The PCS version with the compensation of interrelations between the turbine and reactor controllers constructed according to the same principles as the standard schemes of power units of thermal electric power plant is perspective as well [ru

  1. Units for on-line control with the ES computer in physical investigations

    International Nuclear Information System (INIS)

    Efimov, L.G.

    1983-01-01

    The peripheral part of complex of means created for organization of ES computer operation on-line with experimental devices, comprising two units is described. The first unit is employed as a part of a universal driver of the Camac branch for connection with microprogram ES computer channel controller and ensures multioperational (up to 44 record varieties) device software service. The bilateral data exchange between the device and computer can be performed by bytes as well as 16 or 24-digit words using CAMAC group modes and with maximum rate of 1.25 Mbyte/s. The second unit is meant for synchronization of the data aquisition process with the device starting system and for ensuring the device operator dialogue with the computer

  2. Process Control System of a 500-MW Unit of the Reftinskaya Local Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Grekhov, L. L.; Bilenko, V. A.; Derkach, N. N.; Galperina, A. I.; Strukov, A. P.

    2002-01-01

    The results of the installation of a process control system developed by the Interavtomatika Company (Moscow) for controlling a 500-MW pulverized coal power unit with the use of the Teleperm ME and OM650 equipment of the Siemens Company are described. The system provides a principally new level of automation and process control through monitors comparable with the operation of foreign counterparts with complete preservation of the domestic peripheral equipment. During the 4.5 years of operation of the process control system the intricate algorithms for control and data processing have proved their operational integrity

  3. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  4. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  5. Development of field simulator to test and qualify the gyrotron local control unit for ITER-India Gyrotron Test Facility

    International Nuclear Information System (INIS)

    Shah, Ronak; Mandge, Deepak; Rathod, Vipal; Parmar, Rajvi; Dilip, E. Sharan; Yadav, Amit; Sharma, Anjali; Rao, S.L.

    2017-01-01

    High power RF sources such as a Gyrotron system are operated at required output parameter by using various auxiliary power supplies, High voltage power supplies, auxiliary services and a dedicated Local Control Unit (LCU). These sub-systems must be operated in synchronous and safe way to control the gyrotron output parameters. The LCU performs remote, synchronous and safe operation of the all the gyrotron sub-systems. Broadly the LCU functions are operational control, data acquisition, protection and safety of the gyrotron system. At ITER-India gyrotron Test Facility (IIGTF) a local control unit (LCU) is being developed to operate the complete gyrotron system. This paper presents the design, development and various features of the field simulator. It also discuss LCU functionality test cases and results obtained using field simulator

  6. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  7. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  8. Investigation of the Bilibin reactor operation in the regime of automatic power and frequency control in isolated power system

    International Nuclear Information System (INIS)

    Sankovskij, G.A.; Molochkov, V.I.; Dolgov, V.V.; Soldatov, G.E.; Minashin, M.E.

    1981-01-01

    The results of experimental investigations of the power unit operation of the Bilibin nuclear power and heating plant (BNPHP) in the regime of automatic power and frequency control in an isolated power system are presented. The BNPHP comprises four similar power units. Each unit includes a steam generating setup - the channel water-graphite reactor with tubular fuel elements with natural circulation of boiling water at all the power levels as well as a turbosetup with two heat selectors and a turbogenerator. The turbine operates on dry saturated steam (with intermediate separation) which is brought from the drum-separator of the reactor natural circulation circuit. The BNPHP operates according to the controller schedule since the start-up of the first power unit. The BNPHP unit power varifies within the 50-100% range 3-4 times per day (by the number of maxima in the schedule of the power system loadings). Two design flowsheets of the unit power control and dynamic characteristics of the system for both vatiants are considered. It is concluded that both investigated automatic control systems are seviceable and deviations of the reactor parameters within the transients are not dangerous for heat release from the core. The plant is better shielded from external mainly short-term perturbations coming from the power system when the system operates in accordance with the first variant of the flowsheet [ru

  9. Development and application of automatic frequency and power control systems for large power units

    Energy Technology Data Exchange (ETDEWEB)

    V.A. Bilenko; A.D. Melamed; E.E. Mikushevich; D.Y. Nikol' skii; R.L. Rogachev; N.A. Romanov [ZAO Interavtomatika (Interautomatika AG), Moscow (Russian Federation)

    2008-07-01

    We describe the results of work carried out at ZAO Interavtomatika on the development and putting into use of a system for automatically controlling the frequency and power output of large coal-fired power units involving the retrofitting of the turbine's hydraulic automatic control system. Certificates affirming conformity to the Standard of the System Operator Centralized Dispatching Administration (SO-CDA) have been received for eight power units as an outcome of these efforts.

  10. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Science.gov (United States)

    Aguirre, Erik

    2018-01-01

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework. PMID:29382148

  11. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Directory of Open Access Journals (Sweden)

    Peio Lopez-Iturri

    2018-01-01

    Full Text Available In the context of hospital management and operation, Intensive Care Units (ICU are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  12. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  13. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  14. Procedure to evaluate and control efficiently the operations management of medical equipment in the maintenance unit of a health institution

    Directory of Open Access Journals (Sweden)

    Herrera-Galán Michael

    2018-01-01

    Full Text Available Maintenance management plays a very important role in the success of any company. As a consequence of this, in the year of 2013, a study was carried out in health facilities found in the South Eastern Region of Jamaica with the objective of evaluating the existing Maintenance Management Program for Medical Equipment. Among the results obtained, it showed that there is an inadequacy in the existing program whose principal deficiency is attributed to the operations management. As such, this work proposes a procedure for evaluating and controlling in an efficient manner the operations management within the Biomedical Department which forms part of the South East Regional Health Authority Maintenance Unit (SERHAMU, this latter is found on the premises of the Bustamante Hospital for Children (BHC, Jamaica. The method used to develop the procedure (GOMHO is based fundamentally on the design of: a codification system to identify control registers and to record failures associated with each equipment, a system of placing equipment into categories and further differentiating them based on the potential hazard such pose on the human body in the event of an operational failure. In addition, this procedure gives the SERHAMU at the BHC the opportunity to calculate the amount of human resources needed to carry out efficiently the preventative and corrective maintenance work being demanded on the department. During the implementation phase, the results demonstrated that from the control procedure designed there was an improvement in the planning and carrying out of maintenance work and a better system of monitoring the activities that are executed. Also, it was evidenced that there is a 61.53% of the amount of human resources needed to carry out the maintenance actions.

  15. Goal-directed control with cortical units that are gated by both top-down feedback and oscillatory coherence

    Science.gov (United States)

    Kerr, Robert R.; Grayden, David B.; Thomas, Doreen A.; Gilson, Matthieu; Burkitt, Anthony N.

    2014-01-01

    The brain is able to flexibly select behaviors that adapt to both its environment and its present goals. This cognitive control is understood to occur within the hierarchy of the cortex and relies strongly on the prefrontal and premotor cortices, which sit at the top of this hierarchy. Pyramidal neurons, the principal neurons in the cortex, have been observed to exhibit much stronger responses when they receive inputs at their soma/basal dendrites that are coincident with inputs at their apical dendrites. This corresponds to inputs from both lower-order regions (feedforward) and higher-order regions (feedback), respectively. In addition to this, coherence between oscillations, such as gamma oscillations, in different neuronal groups has been proposed to modulate and route communication in the brain. In this paper, we develop a simple, but novel, neural mass model in which cortical units (or ensembles) exhibit gamma oscillations when they receive coherent oscillatory inputs from both feedforward and feedback connections. By forming these units into circuits that can perform logic operations, we identify the different ways in which operations can be initiated and manipulated by top-down feedback. We demonstrate that more sophisticated and flexible top-down control is possible when the gain of units is modulated by not only top-down feedback but by coherence between the activities of the oscillating units. With these types of units, it is possible to not only add units to, or remove units from, a higher-level unit's logic operation using top-down feedback, but also to modify the type of role that a unit plays in the operation. Finally, we explore how different network properties affect top-down control and processing in large networks. Based on this, we make predictions about the likely connectivities between certain brain regions that have been experimentally observed to be involved in goal-directed behavior and top-down attention. PMID:25152715

  16. The instrument control unit of SPICA SAFARI: a macro-unit to host all the digital control functionalities of the spectrometer

    Science.gov (United States)

    Di Giorgio, Anna Maria; Biondi, David; Saggin, Bortolino; Shatalina, Irina; Viterbini, Maurizio; Giusi, Giovanni; Liu, Scige J.; Cerulli-Irelli, Paquale; Van Loon, Dennis; Cara, Christophe

    2012-09-01

    We present the preliminary design of the Instrument Control Unit (ICU) of the SpicA FAR infrared Instrument (SAFARI), an imaging Fourier Transform Spectrometer (FTS) designed to give continuous wavelength coverage in both photometric and spectroscopic modes from around 34 to 210 µm. Due to the stringent requirements in terms of mass and volume, the overall SAFARI warm electronics will be composed by only two main units: Detector Control Unit and ICU. ICU is therefore a macro-unit incorporating the four digital sub-units dedicated to the control of the overall instrument functionalities: the Cooler Control Unit, the Mechanism Control Unit, the Digital processing Unit and the Power Supply Unit. Both the mechanical solution adopted to host the four sub-units and the internal electrical architecture are presented as well as the adopted redundancy approach.

  17. Operational controlling - a tool of translating strategy into action

    Directory of Open Access Journals (Sweden)

    2011-03-01

    Full Text Available . Enterprises have a lot of problems with realization their strategic aims in the fast changing and competitive business arena from many years. Effective execution of strategic plan needs its translating into action, task results and indicators of everyday activities. The success on the market is attainable by communicating strategic and operating goals on the each level of organizational structure and their connecting with budget of units or employee motivation. The scorecards balancing in finance, customer, process and development perspectives is very useful for pointing - what do we control with? or - what do we have to achieve? But doesn't answer to question about ways of enterprise managing. Main aim of the article is proving that operational controlling system is a essential tool for translating strategy into action. The Balanced Scorecard methodology should to take into consideration system and process connection of enterprise with procurement, co-operation or distribution supply chain also.

  18. AUTOMATION OF OPERATIONAL CONTROL OF DATA FLOWS OF THE METALLURGICAL ENTERPRISE ORGANIZATIONAL STRUCTURE

    Directory of Open Access Journals (Sweden)

    A. N. Chichko

    2006-01-01

    Full Text Available New method for creation of models of operative control of enterprise is offered. The computer variant of the organizational structure, based on analysis of the charging dynamics of control units, is offered and illustrated at the example of one of organizational structures of Belorussian metallurgical works.

  19. 100 Area source operable unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    In accordance with the Hanford Past-Practice Strategy (HPPS), a focused feasibility study (FFS) is performed for those waste sites which have been identified as candidates for interim remedial measures (IRM) based on information contained in applicable work plans and limited field investigations (LFI). The FFS process for the 100 Area source operable units will be conducted in two stages. This report, hereafter referred to as the Process Document, documents the first stage of the process. In this stage, IRM alternatives are developed and analyzed on the basis of waste site groups associated with the 100 Area source operable units. The second stage, site-specific evaluation of the IRM alternatives presented in this Process Document, is documented in a series of operable unit-specific reports. The objective of the FFS (this Process Document and subsequent operable unit-specific reports) is to provide decision makers with sufficient information to allow appropriate and timely selection of IRM for sites associated with the 100 Area source operable units. Accordingly, the following information is presented: a presentation of remedial action objectives; a description of 100 Area waste site groups and associated group profiles; a description of IRM alternatives; and detailed and comparative analyses of the IRM alternatives

  20. SELFADJUSTING AUTOMATIC CONTROL OF SOWING UNIT

    Directory of Open Access Journals (Sweden)

    A. Yu. Izmaylov

    2015-01-01

    Full Text Available The selfadjusting automatic control of sowing unit and differentiated introduction of mineral fertilizers doses according to agrochemical indicators of the soil (precision agriculture are used wider nowadays. It was defined that the main requirement to the differentiated seeding and fertilizing is an accuracy and duration of transition from one norm to another. Established that at a speed of unit of 10 km/h object moves for 0.5 s about on 1.5 m and more. Thus in this device the radio channel originated differentiated correction is updated in 10 s, and in the RTK mode - 0.5-2 s that breaks the accuracy of introduction of seeds and fertilizers. The block schematic diagram of system of automatic control of technological process of seeding and mineral fertilizing with use of navigation means of machine-tractor aggregates orientation in the field and technical means for realization of technology of precision agriculture at sowing and fertilizers application due to electronic maps of soil fertility and navigation satellite systems was worked out. It was noted that for regulation of a fertilizing dose it is necessary to complete the unit with the electric drive, and for error reduction use navigation GLONASS, GPS, Galileo receivers. To tracking of four leading navigation systems GPS/GLONASS/Galileo/Compass receiver with 32 canals developed by domestic-owned firm «KB NAVIS» was suggested. It was established that the automated device created by All-Russia Research Institute of Mechanization for Agriculture information based on NAVSTAR and GLONASS/GPS system successfully operates seeding and make possible the differentiate fertilizing.

  1. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  2. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  3. Effects of a GPC-PID control strategy with hierarchical structure for a cooling coil unit

    International Nuclear Information System (INIS)

    Xu Min; Li Shaoyuan; Cai Wenjian; Lu Lu

    2006-01-01

    This paper presents a GPC-PID control strategy for a cooling-coil unit in heating, ventilation and air conditioning systems. By analysis of the cooling towers and chillers, different models in the occupied period are considered in each operating condition. Because of the complication of components, well tuned PID controllers are unsatisfied, and the results are poor over a wide range of operation conditions. To solve this problem, a GPC-PID controller with hierarchical structure is proposed based on minimizing the generalized predictive control criterion to tune conventional PID controller parameters. Simulation and experiments show that the proposed controller is able to deal with a wide range of operating conditions and to achieve better performance than conventional methods

  4. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    A wide range of manipulator systems has been developed to carry out remotely operated inspection, repair and maintenance tasks at the Magnox reactors in the United Kingdom. A key factor in the improvement of these systems in recent years has been the extensive use of computer graphics as a real-time aid to the manipulator operator. This is exemplified by the reactor pressure vessel inspection work at the Bradwell reactor which is described in detail. The graphics sub-system of the control system for the manipulator plays a unique and wide-ranging role. The 3D modelling and simulation capability of the IGRIP software has contributed to the conceptual design, detailed path planning, rehearsal support, public relations, real-time manipulator display, post inspection documentation and quality assurance. (UK)

  5. 28 CFR 541.47 - Admission to control unit.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Admission to control unit. 541.47 Section... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.47 Admission to control unit. Staff shall provide an inmate admitted to a control unit with: (a) Notice of the projected duration of...

  6. The operating performance tests of power unit A1 in HPP 'Zvornik' in load-frequency control

    Directory of Open Access Journals (Sweden)

    Stanojčić Vladimir

    2012-01-01

    Full Text Available The turbine-governing system characteristics derived from testing hydropower unit A1 in HPP 'Zvornik' are presented. These tests give insights into the setup state and parameters of the governing system, as well as the qualitative analysis of load-frequency control response of the case study power unit within the power system of Serbia. Verification of relevant turbine-governing parameters was performed by direct application of appropriate standards and policies. The presented results can be used as a basis for the derivation of a turbine governor mathematical model and for a complete mathematical model of a hydropower unit as an element embedded in the power system.

  7. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    .... The role of military mental health professionals in combat/operational stress control is to adapt scientific tools for prevention, identification, and treatment for use by military leaders at all levels...

  8. Local control unit for ITER-India gyrotron test facility (IIGTF)

    Energy Technology Data Exchange (ETDEWEB)

    Rathod, Vipal, E-mail: vipal.rathod@iter-india.org; Shah, Ronak; Mandge, Deepak; Parmar, Rajvi; Rao, S.L.

    2016-11-15

    Highlights: • A dedicated full scale ITER prototype Local Control Unit for ITER-India Gyrotron test facility. • National Instruments® make PXIe system for real time control & data acquisition and Siemens® PLC for sequence control function. • Hardwired FPGA based fast protection interlock system. • High speed analog fiber optical transmission link using V/F and F/V technique. • Software framework based on LabVIEW™ platform and ITER CODAC Core System. - Abstract: Electron Cyclotron system on ITER, is one of the important RF ancillary systems based on high power Gyrotron RF sources, that is used for plasma heating and current drive applications. To operate a Gyrotron source, various auxiliary systems and services such as Super Conducting Magnet set, High Voltage Power Supplies, Auxiliary Power Supplies, Waveguide components, Cooling water system and a Local Control Unit (LCU) are required. The LCU plays a very crucial role for the safe and reliable operation of Gyrotron system. A dedicated full scale ITER prototype LCU is being developed for testing and commissioning of an ITER like Test Gyrotron at ITER-India Gyrotron Test facility (IIGTF). The main functions of LCU include Sequence Control, Local Interlock Protection and Real Time Data Acquisition. PLC based slow controller is used for implementing the Sequence Control & Slow Interlock functions. Critical Protection Interlocks are required to have a response time of <10 μs and are implemented using custom built hardware and PXIe based fast controller. Also PXIe system is used for implementing Real Time Data Acquisition function that is required to have slow and fast acquisition with online visualization and off line analysis facility. A Signal Conditioning Unit (SCU) is used to interface and faithfully transmit the field signals to the remote control systems. Necessary controller hardware is procured and several pre-prototype developments have been taken up to establish the critical subsystems such as

  9. Local control unit for ITER-India gyrotron test facility (IIGTF)

    International Nuclear Information System (INIS)

    Rathod, Vipal; Shah, Ronak; Mandge, Deepak; Parmar, Rajvi; Rao, S.L.

    2016-01-01

    Highlights: • A dedicated full scale ITER prototype Local Control Unit for ITER-India Gyrotron test facility. • National Instruments® make PXIe system for real time control & data acquisition and Siemens® PLC for sequence control function. • Hardwired FPGA based fast protection interlock system. • High speed analog fiber optical transmission link using V/F and F/V technique. • Software framework based on LabVIEW™ platform and ITER CODAC Core System. - Abstract: Electron Cyclotron system on ITER, is one of the important RF ancillary systems based on high power Gyrotron RF sources, that is used for plasma heating and current drive applications. To operate a Gyrotron source, various auxiliary systems and services such as Super Conducting Magnet set, High Voltage Power Supplies, Auxiliary Power Supplies, Waveguide components, Cooling water system and a Local Control Unit (LCU) are required. The LCU plays a very crucial role for the safe and reliable operation of Gyrotron system. A dedicated full scale ITER prototype LCU is being developed for testing and commissioning of an ITER like Test Gyrotron at ITER-India Gyrotron Test facility (IIGTF). The main functions of LCU include Sequence Control, Local Interlock Protection and Real Time Data Acquisition. PLC based slow controller is used for implementing the Sequence Control & Slow Interlock functions. Critical Protection Interlocks are required to have a response time of <10 μs and are implemented using custom built hardware and PXIe based fast controller. Also PXIe system is used for implementing Real Time Data Acquisition function that is required to have slow and fast acquisition with online visualization and off line analysis facility. A Signal Conditioning Unit (SCU) is used to interface and faithfully transmit the field signals to the remote control systems. Necessary controller hardware is procured and several pre-prototype developments have been taken up to establish the critical subsystems such as

  10. Secure, Autonomous, Intelligent Controller for Integrating Distributed Emergency Response Satellite Operations

    Science.gov (United States)

    Ivancic, William D.; Paulsen, Phillip E.; Miller, Eric M.; Sage, Steen P.

    2013-01-01

    This report describes a Secure, Autonomous, and Intelligent Controller for Integrating Distributed Emergency Response Satellite Operations. It includes a description of current improvements to existing Virtual Mission Operations Center technology being used by US Department of Defense and originally developed under NASA funding. The report also highlights a technology demonstration performed in partnership with the United States Geological Service for Earth Resources Observation and Science using DigitalGlobe(Registered TradeMark) satellites to obtain space-based sensor data.

  11. Operation of general purpose stepping motor controllers at the National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Stubblefield, F.W.

    1987-01-01

    A prototype and four copies of a general purpose subsystem for mechanical positioning of detectors, samples, and beam line optical elements which constitute experiments at the National Synchrotron Light Source facility of Brookhaven National Laboratory have been constructed and placed into operation. Construction of a sixth subsystem is nearing completion. The subsystems effect mechanical positioning by controlling a set of stepping motors and their associated position encoders. The units are general purpose in the sense that they receive commands over a standard 9600 baud asynchronous serial line compatible with the RS-232-C electrical signal standard, generate TTL-compatible streams of stepping pulses which can be used with a wide variety of stepping motors, and read back position values from a number of different types and models of position encoder. The basic structure of the motor controller subsystem is briefly reviewed. Short descriptions of the positioning apparatus actuated at each of the test and experiment stations employing a motor control unit are given. Additions and enhancements to the sub-system made in response to problems indicated by actual operation of the four installed units are described in more detail

  12. Operation of general purpose stepping motor controllers at the National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Stubblefield, F.W.

    1986-10-01

    A prototype and four copies of a general purpose subsystem for mechanical positioning of detectors, samples, and beam line optical elements which constitute experiments at the National Synchrotron Light Source facility of Brookhaven National Laboratory have been constructed and placed into operation. Construction of a sixth subsystem is nearing completion. The subsystems effect mechanical positioning by controlling a set of stepping motors and their associated position encoders. The units are general purpose in the sense that they receive commands over a standard 9600 baud asynchronous serial line compatible with the RS-232-C electrical signal standard, generate TTL-compatible streams of stepping pulses which can be used with a wide variety of stepping motors, and read back position values from a number of different types and models of position encoder. The basic structure of the motor controller subsystem will be briefly reviewed. Short descriptions of the positioning apparatus actuated at each of the test and experiment stations employing a motor control unit are given. Additions and enhancements to the subsystem made in response to problems indicated by actual operation of the four installed units are described in more detail

  13. Energy Savings and Economics of Advanced Control Strategies for Packaged Air-Conditioning Units with Gas Heat

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Weimin; Katipamula, Srinivas; Huang, Yunzhi; Brambley, Michael R.

    2011-12-31

    Pacific Northwest National Laboratory (PNNL) with funding from the U.S. Department of Energy's Building Technologies Program (BTP) evaluated a number of control strategies that can be implemented in a controller, to improve the operational efficiency of the packaged air conditioning units. The two primary objectives of this research project are: (1) determine the magnitude of energy savings achievable by retrofitting existing packaged air conditioning units with advanced control strategies not ordinarily used for packaged units and (2) estimating what the installed cost of a replacement control with the desired features should be in various regions of the U.S. This document reports results of the study.

  14. Performance investigation on a multi-unit heat pump for simultaneous temperature and humidity control

    International Nuclear Information System (INIS)

    Fan, Hongming; Shao, Shuangquan; Tian, Changqing

    2014-01-01

    Highlights: • A multi-unit heat pump is proposed for simultaneous temperature and humidity control. • Condensation heat is non, partly or fully recovered for temperature regulation. • Highly integrated heat pump for residential cooling, dehumidification and heating. • High energy saving potential for all-year-round operation in wet and warm regions. - Abstract: A multi-unit heat pump is presented for simultaneous humidity and temperature control to improve the energy efficiency and the thermal comfort. Two parallel connected condensers are employed in the system, locating at the back of the indoor evaporator and the outdoor unit, respectively. The heat pump can operate in four modes, including heating, cooling and dehumidification without and/or with partial or total condensing heat recovery. The experimental investigation shows that the temperature control capacity is from 3.5 kW for cooling to 3.8 kW for heating with the cooling and heating efficiency higher than 3.5 kW kW −1 , and the dehumidification rate is about 2.0 kg h −1 with the efficiency about 2.0 kg h −1 kW −1 . The supply air temperature and humidity can be simultaneously regulated with high accuracy and high efficiency by adjusting the indoor and/or outdoor air volumes. It provides an integrated and effective solution for simultaneous indoor air temperature and humidity control for all-year-round operation in residential buildings

  15. Phase 1 remedial investigation report for 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  16. Turbogas control unit using a hydraulic interface; Control de una unidad turbogas usando una interfase hidraulica

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Palacios, Ignacio Ramon; Castelo Cuevas, Luis [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)]. E-mail: irrp@iie.org.mx; lcastelo@iie.org.mx; Escarcega Navarrete, Luis [Servi-Control Monterrey S.A. de C.V., Monterrey, Nuevo Leon (Mexico)]. E-mail: lescarcega@servicontrol.com

    2010-11-15

    This paper presents the design and implementation of the control system of the Turbo Generator Unit (TGU) GE 5001, placed in Laguna Chavez power generation facility in Gomez Palacio, Dgo., Mexico. This TGU had been operating with an old control system, back to the 70's. The positioning of the control valves was carried out using a complex electro-hydraulic system. For the modernization of the control system, we use latest PLC technology and a current to pressure converter to communicate the PLC with the hydraulic control valves. The new control system helped us to obtain a best response at the start and generation phases, as well as an increase in the availability of the unit. We show the old and the new control architectures besides plot results obtained at the different operation points. [Spanish] En este articulo se presenta la implementacion y diseno del sistema de control de una Unidad Turbogas (UTG) GE-5001 de la Central Turbogas Laguna Chavez de CFE ubicada en Gomez Palacio, Durango, la cual originalmente era controlada mediante un sistema de control con tecnologia de los anos 70's. El posicionamiento de las valvulas de control se realizaba mediante un sistema electro-hidraulico complejo. Para la modernizacion del sistema de control a uno con tecnologia de punta fue necesario utilizar una interfase hidraulica por medio de un convertidor de corriente/presion (I/P) para el posicionamiento de las valvulas originales. Con la modernizacion se mejoro la respuesta del control asi como el incremento de la disponibilidad de la unidad. Se presentan la arquitectura anterior y actual de sistema de control asi como graficas de los resultados obtenidos en diferentes puntos de operacion de la UTG.

  17. LOFT advanced control room operator diagnostic and display system (ODDS)

    International Nuclear Information System (INIS)

    Larsen, D.G.; Robb, T.C.

    1980-01-01

    The Loss-of-Fluid Test (LOFT) Reactor Facility in Idaho includes a highly instrumented nuclear reactor operated by the Department of Energy for the purpose of establishing nuclear safety requirements. The results of the development and installation into LOFT of an Operator Diagnostic and Display System (ODDS) are presented. The ODDS is a computer-based graphics display system centered around a PRIME 550 computer with several RAMTEK color graphic display units located within the control room and available to the reactor operators. Use of computer-based color graphics to aid the reactor operator is discussed. A detailed hardware description of the LOFT data system and the ODDS is presented. Methods and problems of backfitting the ODDS equipment into the LOFT plant are discussed

  18. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  19. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  20. Design description of a microprocessor based Engine Monitoring and Control unit (EMAC) for small turboshaft

    Science.gov (United States)

    Baez, A. N.

    1985-01-01

    Research programs have demonstrated that digital electronic controls are more suitable for advanced aircraft/rotorcraft turbine engine systems than hydromechanical controls. Commercially available microprocessors are believed to have the speed and computational capability required for implementing advanced digital control algorithms. Thus, it is desirable to demonstrate that off-the-shelf microprocessors are indeed capable of performing real time control of advanced gas turbine engines. The engine monitoring and control (EMAC) unit was designed and fabricated specifically to meet the requirements of an advanced gas turbine engine control system. The EMAC unit is fully operational in the Army/NASA small turboshaft engine digital research program.

  1. Unit area control in California forests

    Science.gov (United States)

    William E. Hallin

    1951-01-01

    There is a definite distinction between the basic concept of unit area control and the specific techniques or treatments used for specific units. Unit area control as a term was first used in connection with a cutting trial in the sugar pine-fir type; consequently, many foresters think the term refers merely to the technique used in sugar pine management, This is not...

  2. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  3. Operational Performance Risk Assessment in Support of A Supervisory Control System

    Energy Technology Data Exchange (ETDEWEB)

    Denning, Richard S. [Self Employed; Muhlheim, Michael David [ORNL; Cetiner, Sacit M. [ORNL; Guler Yigitoglu, Askin [ORNL

    2017-06-01

    Supervisory control system (SCS) is developed for multi-unit advanced small modular reactors to minimize human interventions in both normal and abnormal operations. In SCS, control action decisions made based on probabilistic risk assessment approach via Event Trees/Fault Trees. Although traditional PRA tools are implemented, their scope is extended to normal operations and application is reversed; success of non-safety related system instead failure of safety systems this extended PRA approach called as operational performance risk assessment (OPRA). OPRA helps to identify success paths, combination of control actions for transients and to quantify these success paths to provide possible actions without activating plant protection system. In this paper, a case study of the OPRA in supervisory control system is demonstrated within the context of the ALMR PRISM design, specifically power conversion system. The scenario investigated involved a condition that the feed water control valve is observed to be drifting to the closed position. Alternative plant configurations were identified via OPRA that would allow the plant to continue to operate at full or reduced power. Dynamic analyses were performed with a thermal-hydraulic model of the ALMR PRISM system using Modelica to evaluate remained safety margins. Successful recovery paths for the selected scenario are identified and quantified via SCS.

  4. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  5. The determination of effective injury controls for metal-cutting lathe operators.

    Science.gov (United States)

    Etherton, J R; Trump, T R; Jensen, R C

    1981-01-01

    Operators of metal-working lathes are one of the largest manufacturing machine worker populations in the United States. Machines (other than vehicular) account for over 10% of occupational injuries each year. An estimated 3,400 operators of metal-working lathes suffer lost-time injuries annually in the United States. Some of these are fatal. Therefore an investigation was undertaken to determine methods for reducing injuries to lathe operators. Three methods were used: (i) review of injury reports, (ii) human factors analysis, and (iii) fault-tree procedures. The investigation followed the man-machine systems approach of looking for injury-producing dysfunctions between the lathe and the lathe operator. The major sources of injury were found to be chips and workholding devices. Secondary tasks were found to be more hazardous than is generally recognized. The use of three methods for approaching the problem was found to be useful in that injury controls were identified which are likely to be adopted because of their potential for improving safety without adversely affecting productivity.

  6. Development of the automatic control rod operation system for JOYO. Verification of automatic control rod operation guide system

    International Nuclear Information System (INIS)

    Terakado, Tsuguo; Suzuki, Shinya; Kawai, Masashi; Aoki, Hiroshi; Ohkubo, Toshiyuki

    1999-10-01

    The automatic control rod operation system was developed to control the JOYO reactor power automatically in all operation modes(critical approach, cooling system heat up, power ascent, power descent), development began in 1989. Prior to applying the system, verification tests of the automatic control rod operation guide system was conducted during 32nd duty cycles of JOYO' from Dec. 1997 to Feb. 1998. The automatic control rod operation guide system consists of the control rod operation guide function and the plant operation guide function. The control rod operation guide function provides information on control rod movement and position, while the plant operation guide function provide guidance for plant operations corresponding to reactor power changes(power ascent or power descent). Control rod insertion or withdrawing are predicted by fuzzy algorithms. (J.P.N.)

  7. Goal-directed control with cortical units that are gated by both top-down feedback and oscillatory coherence

    Directory of Open Access Journals (Sweden)

    Robert R. Kerr

    2014-08-01

    Full Text Available The brain is able to flexibly select behaviors that adapt to both its environment and its present goals. This cognitive control is understood to occur within the hierarchy of the cortex and relies strongly on the prefrontal and premotor cortices, which sit at the top of this hierarchy. Pyramidal neurons, the principal neurons in the cortex, have been observed to exhibit much stronger responses when they receive inputs at their soma/basal dendrites that are coincident with inputs at their apical dendrites. This corresponds to inputs from both lower-order regions (feedforward and higher-order regions (feedback, respectively. In addition to this, coherence between oscillations, such as gamma oscillations, in different neuronal groups has been proposed to modulate and route communication in the brain. In this paper, we develop a simple, but novel, neural mass model in which cortical units (or ensembles exhibit gamma oscillations when they receive coherent oscillatory inputs from both feedforward and feedback connections. By forming these units into circuits that can perform logic operations, we identify the different ways in which operations can be initiated and manipulated by top-down feedback. We demonstrate that more sophisticated and flexible top-down control is possible when the gain of units is modulated by not only top-down feedback but by coherence between the activities of the oscillating units. With these types of units, it is possible to not only add units to, or remove units from, a higher-level unit's logic operation using top-down feedback, but also to modify the type of role that a unit plays in the operation. Finally, we explore how different network properties affect top-down control and processing in large networks. Based on this, we make predictions about the likely connectivities between certain brain regions that have been experimentally observed to be involved in goal-directed behavior and top-down attention.

  8. Study on the main control room design for Hamaoka Unit No.5

    International Nuclear Information System (INIS)

    Tsuruta, Tadakazu; Sakamoto, Minoru; Maruyama, Tohru; Saito, Tadashi

    2000-01-01

    The main control room of nuclear power station is important to operate the power station and to promote public acceptance of nuclear power station. To enhance them, there is an idea of high ceiling control room with a gallery room located in backside middle upper floor. The control room is expected to enhance habitability and to offer visitors the fine view of the control room. In this study, psychological and physiological influence of such a high ceiling control room design on operators was investigated first. And then some human engineering requirements for desirable main control room were identified. A control room (ceiling height: about 5 meters) adequate to the requirements was designed, and finally the validity of the design was verified by means of full mockup model room tests. The results of this study are applied to the main control room design of Hamaoka Nuclear Power Station Unit No.5 (Chubu Electric Power Co., Inc.) (author)

  9. 49 CFR 236.777 - Operator, control.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operator, control. 236.777 Section 236.777..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.777 Operator, control. An employee assigned to operate the control machine of a traffic control system. ...

  10. 28 CFR 541.49 - Review of control unit placement.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Review of control unit placement. 541.49... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.49 Review of control unit placement. (a) Unit staff shall evaluate informally and daily an inmate's adjustment within the control unit...

  11. Safety measures for the main control board replacement project at Ikata units 1 and 2

    International Nuclear Information System (INIS)

    Hashimoto, Nozomu; Tada, Kenji

    2013-01-01

    When Units 1 and 2 of the Ikata Power Station underwent replacement of their main control boards, control cabinets, and associated equipment, it was necessary to remove all the control boards, cabinets, and cables from the control building including from the main control room. This meant the loss of operation and monitoring functions in the main control room and functions of control cabinets. To maintain the operation and monitoring functions required under plant shutdown conditions, temporary operation and monitoring equipment (i.e., temporary main control board) was installed in the temporary main control room. The advance preparations included a trial switching from the permanent to the temporary main control board to identify and address potential problems in advance. When the replacement work was underway, a work schedule sheet posted in the temporary and the permanent control rooms was used to prevent human errors caused by operators’ recognition errors. Monitoring and control signals were switched from the old boards to the temporary boards and from the temporary boards to the new boards at appropriate timings to ensure plant safety during the replacement operation. (author)

  12. Implementation of Active Learning Method in Unit Operations II Subject

    OpenAIRE

    Ma'mun, Sholeh

    2018-01-01

    ABSTRACT: Active Learning Method which requires students to take an active role in the process of learning in the classroom has been applied in Department of Chemical Engineering, Faculty of Industrial Technology, Islamic University of Indonesia for Unit Operations II subject in the Even Semester of Academic Year 2015/2016. The purpose of implementation of the learning method is to assist students in achieving competencies associated with the Unit Operations II subject and to help in creating...

  13. Nuclear safety risk control in the outage of CANDU unit

    International Nuclear Information System (INIS)

    Wu Mingliang; Zheng Jianhua

    2014-01-01

    Nuclear fuel remains in the core during the outage of CANDU unit, but there are still nuclear safety risks such as reactor accidental criticality, fuel element failure due to inability to properly remove residual heat. Furthermore, these risks are aggravated by the weakening plant system configuration and multiple cross operations during the outage. This paper analyzes the phases where there are potential nuclear safety risks on the basis of the typical critical path arrangement of the outage of Qinshan NPP 3 and introduces a series of CANDU-specific risk control measures taken during the past plant outages to ensure nuclear safety during the unit outage. (authors)

  14. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  15. Some problems raised by the operation of large nuclear turbo-generator sets. Automatic control system for steam turbo-generator units

    International Nuclear Information System (INIS)

    Cecconi, F.

    1976-01-01

    The design of an appropriate automatic system was found to be useful to improve the control of large size turbo-generator units so as to provide easy and efficient control and monitoring. The experience of the manufacturer of these turbo-generator units allowed a system well suited for this function to be designed [fr

  16. Co-operatives and Normative Control

    DEFF Research Database (Denmark)

    Bregn, Kirsten; Jagd, Søren

    1992-01-01

    This paper explores the conditions for applying normative control in co-operatives. For normative control to be effective two conditions are found particularly important: Individuals must be morally involved and the organization must have a system of making it possible to link common norms...... and individual action. If these conditions are not fulfilled, as may be the case in many co-operatives, normative control cannot be expected to work. The problems of normative control in co-operatives may then not be caused by the use of normative control as such, but may instead be a problem of securing...

  17. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  18. Nurse managers' decision-making in daily unit operation in peri-operative settings: a cross-sectional descriptive study.

    Science.gov (United States)

    Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina

    2016-09-01

    To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.

  19. Automatic control unit for A neutron diffraction crystal spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    Adib, M.; Abbas, Y.; Mostafa, M.; Hamouda, I.

    1982-01-01

    An automatic transistorized unit has been designed and constructed to control the operation of the double axis crystal spectrometer installed in front of one of the horizontal channels of the ET-RR-1 reactor. The function of the automatic unit is to store the diffracted neutrons at a certain angle with respect to the direction of the incident neutron beam in a selected channel of a 1024-multichannel analyzer for a certain preadjusted time period. AT the end of this time period the unit rotates the spectrometer's arm to another angle, selects the next channel of the MCA and provides the measurement of the diffracted neutron for the same time period. Such a sequence is repeated automatically over all angles required for the neutron diffraction pattern of the sample under investigation. As a result, the stored information at the MCA provides the neutron diffraction pattern as a function of channel number, where each channel corresponds to a certain scattering angle. The stored distribution at MCA can be obtained through the analyzer read out unit. The designed automatic unit has the possibility of providing the neutron diffraction pattern using a 6-digit scaler and a printer.

  20. 28 CFR 541.50 - Release from a control unit.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Release from a control unit. 541.50... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.50 Release from a control unit. (a) Only the Executive Panel may release an inmate from a control unit. The following factors are...

  1. 28 CFR 541.48 - Search of control unit inmates.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Search of control unit inmates. 541.48... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.48 Search of control unit inmates. (a) The Warden at an institution housing a control unit may order a digital or simple instrument...

  2. A dynamic model used for controller design of a coal fired once-through boiler-turbine unit

    International Nuclear Information System (INIS)

    Liu, Ji-Zhen; Yan, Shu; Zeng, De-Liang; Hu, Yong; Lv, You

    2015-01-01

    Supercritical OTB (once-through boiler) units with high steam temperature and pressure have been widely used in modern power plants due to their high cycle efficiency and less emissions. To ensure the effective operation of such power generation systems, it is necessary to build a model for the design of the overall control system. There are already detailed models of once-through boilers; however, their complexity prevents them from being applied in the controller design. This study describes a lumped parameter dynamic model that has a relatively low complexity while faithfully capturing the essential overall plant dynamics. The model structure was derived by fundamental physical laws utilizing reasonable simplifications and data analysis to avoid the phase transition position problem. Parameter identification for the model structure was completed using operational data from a 1000 MW ultra-supercritical OTB. The model was determined to be reasonable by comparison tests between computed data and measured data for both steady and dynamic states. The simplified model is verified to have appropriate fidelity in control system design to achieve effective and economic operation of the unit. - Highlights: • A simplified dynamic model of once-through boiler-turbine unit is given. • The essential dynamics of active power and throttle pressure is presented. • The change of phase transition position is avoided in modeling process. • The model has appropriate complexity and fidelity for controller design.

  3. Prospects and requirements for an operational modelling unit in flood crisis situations

    Directory of Open Access Journals (Sweden)

    Anders Katharina

    2016-01-01

    Full Text Available Dike failure events pose severe flood crisis situations on areas in the hinterland of dikes. In recent decades the importance of being prepared for dike breaches has been increasingly recognized. However, the pre-assessment of inundation resulting from dike breaches is possible only based on scenarios, which might not reflect the situation of a real event. This paper presents a setup and workflow that allows to model dike breachinduced inundation operationally, i.e. when an event is imminent or occurring. A comprehensive system setup of an operational modelling unit has been developed and implemented in the frame of a federal project in Saxony-Anhalt, Germany. The modelling unit setup comprises a powerful methodology of flood modelling and elaborated operational guidelines for crisis situations. Nevertheless, it is of fundamental importance that the modelling unit is instated prior to flood events as a permanent system. Moreover the unit needs to be fully integrated in flood crisis management. If these crucial requirements are met, a modelling unit is capable of fundamentally supporting flood management with operational prognoses of adequate quality even in the limited timeframe of crisis situations.

  4. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Science.gov (United States)

    2012-10-12

    ... Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units Operating on the U.S. Outer... ``Mobile Offshore Drilling Unit Dynamic Positioning Guidance''. The notice recommended owners and operators of Mobile Offshore Drilling Units (MODUs) follow Marine Technology Society (MTS) Dynamic Positioning...

  5. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  6. Optimal operation of cogeneration units. State of art and perspective

    International Nuclear Information System (INIS)

    Polimeni, S.

    2001-01-01

    Optimal operation of cogeneration plants and of power plant fueling waste products is a complex challenge as they have to fulfill, beyond the contractual obligation of electric power supply, the constraints of supplying the required thermal energy to the user (for cogeneration units) or to burn completely the by-products of the industrial complex where they are integrated. Electrical power market evolution is pushing such units to a more and more volatile operation caused by uncertain selling price levels. This work intends to pinpoint the state of art in the optimization of these units outlining the important differences among the different size and cycles. The effect of the market liberalization on the automation systems and the optimization algorithms will be discussed [it

  7. Mass and number size distributions of emitted particulates at five important operation units in a hazardous industrial waste incineration plant.

    Science.gov (United States)

    Lin, Chi-Chi; Huang, Hsiao-Lin; Hsiao, Wen-Yuan

    2016-01-01

    Past studies indicated particulates generated by waste incineration contain various hazardous compounds. The aerosol characteristics are very important for particulate hazard control and workers' protection. This study explores the detailed characteristics of emitted particulates from each important operation unit in a rotary kiln-based hazardous industrial waste incineration plant. A dust size analyzer (Grimm 1.109) and a scanning mobility particle sizer (SMPS) were used to measure the aerosol mass concentration, mass size distribution, and number size distribution at five operation units (S1-S5) during periods of normal operation, furnace shutdown, and annual maintenance. The place with the highest measured PM10 concentration was located at the area of fly ash discharge from air pollution control equipment (S5) during the period of normal operation. Fine particles (PM2.5) constituted the majority of the emitted particles from the incineration plant. The mass size distributions (elucidated) made it clear that the size of aerosols caused by the increased particulate mass, resulting from work activities, were mostly greater than 1.5 μm. Whereas the number size distributions showed that the major diameters of particulates that caused the increase of particulate number concentrations, from work activities, were distributed in the sub micrometer range. The process of discharging fly ash from air pollution control equipment can significantly increase the emission of nanoparticles. The mass concentrations and size distributions of emitted particulates were different at each operation unit. This information is valuable for managers to take appropriate strategy to reduce the particulate emission and associated worker exposure.

  8. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  9. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    International Nuclear Information System (INIS)

    Lee, Kai-Yan; Fung, Chi-Hang Fred; Chau, H F

    2013-01-01

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state. (paper)

  10. Limited field investigation report for the 100-KR-4 Operable Unit

    International Nuclear Information System (INIS)

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated

  11. Limited field investigation report for the 100-DR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km 2 (0.59 mi 2 ) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  12. Control area readiness audit report of the Independent Electricity Market Operator (IMO)

    International Nuclear Information System (INIS)

    Gladish, L.A.; Campoli, G.; Le, Q.; Farrokhpay, S.; Kirby, B.; Penwell, C.; Weaver, S.; Vicini, D.; Wells, M.

    2004-01-01

    The Independent Electricity Market Operator (IMO) is a control area authority that is responsible for the safe and reliable operation of its portion of the bulk electric system in cooperation with neighbouring control areas. This audit by the North American Electric Reliability Council (NERC) reviewed the readiness of Ontario's IMO to meets its responsibilities as a control area operator. NERC recommended specific actions to correct the deficiencies that resulted in the blackout in southeastern Ontario and northeastern United States on August 14, 2003. Initiatives to strengthen compliance with existing standards were also suggested along with longer-term technical initiatives to prevent or mitigate the impacts of cascading blackouts in the future. The audit process included: a self-assessment questionnaire to the control area being audited; a questionnaire to neighbouring control areas; a questionnaire to the reliability coordinator and an on-site audit by a selected audit team. The following issues were reviewed: criteria and compliance, authority, responsibilities in the planning time frame, real time monitoring, system restoration, delegation of reliability coordinator functions, outage coordination, transmission and generation relaying, energy emergency plan, operating policy, line clearances, and nuclear power plant requirements. It was concluded that the IMO has the necessary plans, procedures, processes, tools and trained personnel to respond to emergency events. The audit did not find any major operational problems, but offered a few recommendations for improvement. tabs

  13. Automatic operation device for control rods

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1984-01-01

    Purpose: To enable automatic operation of control rods based on the reactor operation planning, and particularly, to decrease the operator's load upon start up and shutdown of the reactor. Constitution: Operation plannings, demand for the automatic operation, break point setting value, power and reactor core flow rate change, demand for operation interrupt, demand for restart, demand for forecasting and the like are inputted to an input device, and an overall judging device performs a long-term forecast as far as the break point by a long-term forecasting device based on the operation plannings. The automatic reactor operation or the like is carried out based on the long-term forecasting and the short time forecasting is performed by the change in the reactor core status due to the control rod operation sequence based on the control rod pattern and the operation planning. Then, it is judged if the operation for the intended control rod is possible or not based on the result of the short time forecasting. (Aizawa, K.)

  14. 14 CFR 23.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 23.1142... Powerplant Controls and Accessories § 23.1142 Auxiliary power unit controls. Means must be provided on the... power unit. [Doc. No. 26344, 58 FR 18974, Apr. 9, 1993] ...

  15. 21 CFR 211.22 - Responsibilities of quality control unit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Responsibilities of quality control unit. 211.22... Personnel § 211.22 Responsibilities of quality control unit. (a) There shall be a quality control unit that... have been fully investigated. The quality control unit shall be responsible for approving or rejecting...

  16. Operation of Beaver Valley Power Station, Unit 2, Docket No. 50-412, Beaver County, Pennsylvania

    International Nuclear Information System (INIS)

    1985-09-01

    The final environmental impact statement (EPA No. 850438F) assesses the effects of operating a pressurized water reactor in Pennsylvania on the south bank of the Ohio River, which would serve as the final heat sink for the cooling system. Operation of Unit 2 would add 836 MW of capacity and increase system reliability. The plant would employ 465 at an $18 million payroll. Facilities for the plant would take up 56 acres of agricultural land. The operation result in both water and noise pollution. There is only a small probability of impacts due to potential radiation exposure. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Regulations require the impact statement

  17. Mental workload measurement in operator control room using NASA-TLX

    Science.gov (United States)

    Sugarindra, M.; Suryoputro, M. R.; Permana, A. I.

    2017-12-01

    The workload, encountered a combination of physical workload and mental workload, is a consequence of the activities for workers. Central control room is one department in the oil processing company, employees tasked with monitoring the processing unit for 24 hours nonstop with a combination of 3 shifts in 8 hours. NASA-TLX (NASA Task Load Index) is one of the subjective mental workload measurement using six factors, namely the Mental demand (MD), Physical demand (PD), Temporal demand (TD), Performance (OP), Effort (EF), frustration levels (FR). Measurement of a subjective mental workload most widely used because it has a high degree of validity. Based on the calculation of the mental workload, there at 5 units (DTU, NPU, HTU, DIST and OPS) at the control chamber (94; 83.33; 94.67; 81, 33 and 94.67 respectively) that categorize as very high mental workload. The high level of mental workload on the operator in the Central Control Room is a requirement to have high accuracy, alertness and can make decisions quickly

  18. Statistical process control: separating signal from noise in emergency department operations.

    Science.gov (United States)

    Pimentel, Laura; Barrueto, Fermin

    2015-05-01

    Statistical process control (SPC) is a visually appealing and statistically rigorous methodology very suitable to the analysis of emergency department (ED) operations. We demonstrate that the control chart is the primary tool of SPC; it is constructed by plotting data measuring the key quality indicators of operational processes in rationally ordered subgroups such as units of time. Control limits are calculated using formulas reflecting the variation in the data points from one another and from the mean. SPC allows managers to determine whether operational processes are controlled and predictable. We review why the moving range chart is most appropriate for use in the complex ED milieu, how to apply SPC to ED operations, and how to determine when performance improvement is needed. SPC is an excellent tool for operational analysis and quality improvement for these reasons: 1) control charts make large data sets intuitively coherent by integrating statistical and visual descriptions; 2) SPC provides analysis of process stability and capability rather than simple comparison with a benchmark; 3) SPC allows distinction between special cause variation (signal), indicating an unstable process requiring action, and common cause variation (noise), reflecting a stable process; and 4) SPC keeps the focus of quality improvement on process rather than individual performance. Because data have no meaning apart from their context, and every process generates information that can be used to improve it, we contend that SPC should be seriously considered for driving quality improvement in emergency medicine. Copyright © 2015 Elsevier Inc. All rights reserved.

  19. Operating experience with unit for sulfuric acid alkylation of isobutane by butylenes

    Energy Technology Data Exchange (ETDEWEB)

    Tagavov, I.T.; Sumanov, V.T.; Khadzhiev, S.N.

    1988-09-01

    The operation of units for the sulfuric acid alkylation of isobutanes by butylenes have been performed. The reaction was carried out in a KSG-3 horizontal sulfuric acid contractor. A butane-butylene fraction from catalytic cracking and an isobutane fraction from the central gas fractionating unit were used as a feedstock. The studies have shown that the unit will give a high-quality product under various conditions of operation. The specific consumption of sulfuric acid in processing different types of feed remains within acceptable limits.

  20. The analysis in real time, during the pre-commissioning period, of the overall plant control system of the CANDU NPP unit

    International Nuclear Information System (INIS)

    Tapu, C.; Irimia, M.

    1994-01-01

    The physical processes in the CANDU NPP are controlled by a computer system which, based on the associated package of programmes, performs both the monitoring function at the level of the operational area, and the digital regulation function of the technological systems within the NPP. For an optimal operation of the NPP, in dynamic as well as in stationary regime, the correlation of the direct digital control of the technological systems is very important for the NPP's overall digital control system. Taking into account the fact that during the pre-commissioning period of a CANDU unit it is necessary to test in dynamic regime the performance of the overall digital control function of the NPP, a system of verification and testing in real time was developed, by connecting a micro simulator of the physical process in the NPP to the actual computer system of the unit. The paper presents the methods and techniques used, as well as the results of the tests for various operational modes, which highlight the functioning of the digital control system of the CANDU NPP unit. (Author)

  1. Unit Testing for Command and Control Systems

    Science.gov (United States)

    Alexander, Joshua

    2018-01-01

    Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

  2. Operating experience of the automatic technological control system at the Kolsk NPP

    International Nuclear Information System (INIS)

    Volkov, A.P.; Ignatenko, E.I.; Kolomtsev, Yu.V.; Mel'nikov, E.F.; Trofimov, B.A.

    1981-01-01

    Briefly reviewed is operating experience of the automatic control systems of the kolsk NPP (KNPP) power units, where measuring technique of the neutron flux ''Iney'', ARM-4 power regulator, automatic turbine start-up system ATS are used. The main shortcomings of the technological process automatic control system (ACS) and ways of their removal are considered. It is noted that the KNPP ACS performs only limited start-up functions of the basic equipment and reactor power control as well as partially protection functions at instant loading drops and switch-off of the main circulating pump [ru

  3. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  4. Limited field investigation report for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-09-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses

  5. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment (QRA). The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, bum pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy [DOE], the US Environmental Protection Agency [EPA], and Washington Department of Ecology [Ecology]) during the preparation of the 100-HR-2 Operable Unit work plan (DOE/RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure (IRM) as per the Hanford Past-Practice Strategy (HPPS) (DOE/RL 1991) and negotiations with DOE, EPA, and Ecology. An IRM is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The investigative phase was conducted in accordance with the RCRA Facility Investigation/Corrective Measures Study Work Plan for the 100-HR-2 Operable Unit (DOE/RL 1993f). The QRA was performed in accordance with the Hanford Site Baseline Risk Assessment Methodology (DOE/RL 1993b) and the recommendations incorporate the strategies of the HPPS. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and (4) provide a human health and ecological QRA associated with solid waste burial grounds

  6. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  7. Operation control device under radiation exposure

    International Nuclear Information System (INIS)

    Kimura, Kiichi; Murakami, Toichi.

    1994-01-01

    The device of the present invention performs smooth progress of operation by remote control for a plurality of operations in periodical inspections in controlled areas of a nuclear power plant, thereby reducing the operator's exposure dose. Namely, the device monitors the progressing state of the operation by displaying the progress of operation on a CRT of a centralized control device present in a low dose area remote from an operation field through an ITV camera disposed in the vicinity of the operation field. Further, operation sequence and operation instruction procedures previously inputted in the device are indicated to the operation field through an operation instruction outputting device (field CRT) in accordance with the progress of the operation steps. On the other hand, the operation progress can be aided by inputting information from the operation field such as start or completion of the operation steps. Further, the device of the present invention can monitor the change of operation circumstances and exposure dose of operators based on the information from a radiation dose measuring device disposed in the operation circumstance and to individual operators. (I.S.)

  8. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  9. Overall intelligent hybrid control system for a fossil-fuel power unit

    Energy Technology Data Exchange (ETDEWEB)

    Garduno-Ramirez, Raul

    2000-08-01

    This research present a methodology to design a generalized overall unit control system for a fossil fuel power unit (FFPU), and develops a minimum prototype to demonstrate its feasibility. Toward the above goal, the associated research project was undertaken as a technology innovation process with its two ends identified as follows. First, it is recognized that the coordinated control strategies constitute the uppermost control level in current FFPUs, and so, are responsible for driving the boiler-turbine-generator set as a single entity. Second, a FFPU is envisioned as a complex process, subject to multiple changing operating conditions, that should perform as an intelligent system, for which an advanced integral control concept is needed. Therefore, as an outcome of the innovation process, a generalized unit control concept that extends the capabilities of current coordinated control schemes is proposed. This concept is presented as the Intelligent Coordinated Control System (ICCS) paradigm, which establishes an open reference framework for the development of overall unit control schemes. The ICCS's system goals are identified using power plant process engineering concepts, and intelligent control systems engineering concepts are used to identify main tasks and to achieve system functional decomposition. A software engineering agency concept is used to identify and group agents according to their knowledge and purpose interactions. The resultant ICCS structure is an open set of functionally grouped agent clusters in a two-level hierarchical system. The upper level, mainly characterized for knowledge-driven processes, performs the supervisory functions needed to provide self governing operation characteristics, while the lower level, mainly characterized for data-driven processes, performs the fast reactive behavior functions necessary for hybrid real-time control and protection. Developed through several stages, the ICCS-MP finally implements a two

  10. Industrial hygiene and control technology assessment of ion implantation operations

    International Nuclear Information System (INIS)

    Ungers, L.J.; Jones, J.H.

    1986-01-01

    Ion implantation is a process used to create the functional units (pn junctions) of integrated circuits, photovoltaic (solar) cells and other semiconductor devices. During the process, ions of an impurity or a dopant material are created, accelerated and imbedded in wafers of silicon. Workers responsible for implantation equipment are believed to be at risk from exposure to both chemical (dopant compounds) and physical (ionizing radiation) agents. In an effort to characterize the chemical exposures, monitoring for chemical hazards was conducted near eleven ion implanters at three integrated circuit facilities, while ionizing radiation was monitored near four of these units at two of the facilities. The workplace monitoring suggests that ion implantation operators routinely are exposed to low-level concentrations of dopants. Although the exact nature of dopant compounds released to the work environment was not determined, area and personal samples taken during normal operating activities found concentrations of arsenic, boron and phosphorous below OSHA Permissible Exposure Limits (PELs) for related compounds; area samples collected during implanter maintenance activities suggest that a potential exists for more serious exposures. The results of badge dosimetry monitoring for ionizing radiation indicate that serious exposures are unlikely to occur while engineering controls remain intact. All emissions were detected at levels unlikely to result in exposures above the OSHA standard for the whole body (1.25 rems per calendar quarter). The success of existing controls in preventing worker exposures is discussed. Particular emphasis is given to the differential exposures likely to be experienced by operators and maintenance personnel.(ABSTRACT TRUNCATED AT 250 WORDS)

  11. Multiagent based Distributed Control for Operation Cost Minimization of Droop Controlled AC Microgrid Using Incremental Cost Consensus

    DEFF Research Database (Denmark)

    Li, Chendan; Firoozabadi, Mehdi Savaghebi; Quintero, Juan Carlos Vasquez

    2015-01-01

    sharing based on the power rating. With various types of distributed generator (DG) units in the system, factors that closely related to the operation cost, such as fuel cost and efficiencies of the generator should be taken into account in order to improve the efficiency of the whole system....... In this paper, a multiagent based distributed method is proposed to minimize operation cost of the AC microgrid. Each DG is acting as an agent which regulates the power individually using proposed frequency scheduling method. Optimal power command is obtained through carefully designed consensus algorithm...... with only light communication between neighboring agents. Case studies verified that the proposed control strategy can effectively reduce the operation cost....

  12. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Directory of Open Access Journals (Sweden)

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  13. Multipurpose units: combining of technological operations of a soil cultivating and seeding

    Directory of Open Access Journals (Sweden)

    D. A. Petukhov

    2015-01-01

    Full Text Available The modern domestic market of technique for grain crops seeding differs variety of machines brands and types. The intensive type technologies combining technological operations of a soil cultivating and grain crops seeding in one pass are more widely used. The authors have established that one-operational units in new machine park have to be replaced multipurpose, universal and combined machines. Such approach will reduce number of machines in grain production from 20-30 to 5-6 name titles. Possibilities of multipurpose sowing units for simultaneous fertilizers application, soil cultivating and weeds destruction were analyzed. It was specified that nowadays there are several technologies types with two, four or six operations overlapping. Operational performance, technological and economical efficiency of the best multipurpose and also efficiency of technological operations overlapping at grain crops cultivating in the conditions of their real operation and at a trial establishment in the Kuban research institute of information and technical and economic studies of agro-industrial complex engineering and technical services were studied. Tit was defined that use of multipurpose sowing units and also studied efficiency of decreases operational costs by 48-71 percent, fuel consumption - by 41-76 percent and reduces labor input by 72-80 percent. Thus grain crops seeding is possible in optimal agrotime because of 4-6 technological operations overlapping in one pass.

  14. Simulators for NPP operators

    International Nuclear Information System (INIS)

    Yuzhakov, A.Yu.

    2010-01-01

    The author reports on the application of full-scale simulators for training and maintaining proficiency of unit control room operators that is an essential element of Russian NPPs personnel education system. The existing simulators for the unit control room operating personnel are listed. The integrated approach to developing and maintaining the training hardware is described. The integrated approach is being implemented on the basis of observance of the existing requirements to training hardware, improvement of regulations, control from a single centre responsible for the provision of support to the activities, inclusion into the plans of simulators for development of skills for operating control over equipment and systems, as well as control from local boards [ru

  15. An automatic control unit for A neutron diffraction crystal spectrometer

    International Nuclear Information System (INIS)

    Adib, M.; Abbas, Y.; Mostafa, M.; Hamouda, I.

    1982-01-01

    An automatic transistorized unit has been designed and constructed to control the operation of the double axis crystal spectrometer installed in front of one of the horizontal channels of the ET-RR-1 reactor. The function of the automatic unit is to store the diffracted neutrons at a certain angle with respect to the direction of the incident neutron beam in a selected channel of a 1024-multichannel analyzer for a certain preadjusted time period. AT the end of this time period the unit rotates the spectrometer's arm to another angle, selects the next channel of the MCA and provides the measurement of the diffracted neutron for the same time period. Such a sequence is repeated automatically over all angles required for the neutron diffraction pattern of the sample under investigation. As a result, the stored information at the MCA provides the neutron diffraction pattern as a function of channel number, where each channel corresponds to a certain scattering angle. The stored distribution at MCA can be obtained through the analyzer read out unit. The designed automatic unit has the possibility of providing the neutron diffraction pattern using a 6-digit scaler and a printer

  16. Numerical Analysis of Loss of Residual Heal Removal System (RHRS) during Mid-Loop Operation for Hanul NPP Units 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sook Kwan; Park, Seong Gyu; Han, Sang Koo [ACT Co., Daejeon (Korea, Republic of)

    2016-10-15

    As a part of supporting LPSD (Low Power and Shutdown) PSA (Probabilistic Safety Assessment) of Hanul NPP units 1 and 2, numerical analysis for a loss of RHRS (Residual Heat Removal system) during midloop operation was performed using RELAP5/MOD3.3 code. The one of main purpose of thermal hydraulic analysis for PSA work is to estimate times allowable for operation actions in each accident. A loss of RHRS during mid-loop operation may cause more significant results than during RCS full condition due to reduced RCS inventory. In order to perform this kind of analysis, it is particularly important to establish a steady state of mid-loop operational initial condition. Mid-loop operation corresponds to POS(Plant Operational State) 5 and 11 in the category of LPSD PSA at Hanul NPP units 1 and 2. RELAP5/MOD3.3 code was used to predict behaviors of RCS and fuels for the case of loss of RHRS during mid-loop operation at Hanul NPP units 1 and 2. The initial state of mid-loop operational condition was established by proper control of charging and letdown flow. Considering existing similar analysis results for this kind of accident, it can be concluded that RELAP5 code well predicts reasonably the behavior of RCS for loss of RHRS during mid-loop operation in Hanul NPP units 1 and 2. Thus the method developed in the analysis can be applied reasonably to support LPSD PSA.

  17. Control room human engineering influences on operator performance

    International Nuclear Information System (INIS)

    Finlayson, F.C.

    1977-01-01

    Three general groups of factors influence operator performance in fulfilling their responsibilities in the control room: (1) control room and control system design, informational data displays (operator inputs) as well as control board design (for operator output); (2) operator characteristics, including those skills, mental, physical, and emotional qualities which are functions of operator selection, training, and motivation; (3) job performance guides, the prescribed operating procedures for normal and emergency operations. This paper presents some of the major results of an evaluation of the effect of human engineering on operator performance in the control room. Primary attention is given to discussion of control room and control system design influence on the operator. Brief observations on the influences of operator characteristics and job performance guides (operating procedures) on performance in the control room are also given. Under the objectives of the study, special emphasis was placed on the evaluation of the control room-operator relationships for severe emergency conditions in the power plant. Consequently, this presentation is restricted largely to material related to emergency conditions in the control room, though it is recognized that human engineering of control systems is of equal (or greater) importance for many other aspects of plant operation

  18. National Ignition Facility Control and Information System Operational Tools

    International Nuclear Information System (INIS)

    Marshall, C.D.; Beeler, R.G.; Bowers, G.A.; Carey, R.W.; Fisher, J.M.; Foxworthy, C.B.; Frazier, T.M.; Mathisen, D.G.; Lagin, L.J.; Rhodes, J.J.; Shaw, M.J.

    2009-01-01

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a ∼2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

  19. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  20. 21 CFR 870.4300 - Cardiopulmonary bypass gas control unit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cardiopulmonary bypass gas control unit. 870.4300... bypass gas control unit. (a) Identification. A cardiopulmonary bypass gas control unit is a device used to control and measure the flow of gas into the oxygenator. The device is calibrated for a specific...

  1. Pressure Swing Adsorption in the Unit Operations Laboratory

    Science.gov (United States)

    Ganley, Jason

    2018-01-01

    This paper describes a student laboratory in the Unit Operations Laboratory at the Colorado School of Mines: air separation by pressure swing adsorption. The flexibility of the system enables students to study the production of enriched nitrogen or oxygen streams. Automatic data acquisition permits the study of cycle steps and performance.…

  2. The Vertebrate Brain, Evidence of Its Modular Organization and Operating System: Insights into the Brain's Basic Units of Structure, Function, and Operation and How They Influence Neuronal Signaling and Behavior

    Science.gov (United States)

    Baslow, Morris H.

    2011-01-01

    The human brain is a complex organ made up of neurons and several other cell types, and whose role is processing information for use in eliciting behaviors. However, the composition of its repeating cellular units for both structure and function are unresolved. Based on recent descriptions of the brain's physiological “operating system”, a function of the tri-cellular metabolism of N-acetylaspartate (NAA) and N-acetylaspartylglutamate (NAAG) for supply of energy, and on the nature of “neuronal words and languages” for intercellular communication, insights into the brain's modular structural and functional units have been gained. In this article, it is proposed that the basic structural unit in brain is defined by its physiological operating system, and that it consists of a single neuron, and one or more astrocytes, oligodendrocytes, and vascular system endothelial cells. It is also proposed that the basic functional unit in the brain is defined by how neurons communicate, and consists of two neurons and their interconnecting dendritic–synaptic–dendritic field. Since a functional unit is composed of two neurons, it requires two structural units to form a functional unit. Thus, the brain can be envisioned as being made up of the three-dimensional stacking and intertwining of myriad structural units which results not only in its gross structure, but also in producing a uniform distribution of binary functional units. Since the physiological NAA–NAAG operating system for supply of energy is repeated in every structural unit, it is positioned to control global brain function. PMID:21720525

  3. The Vertebrate Brain, Evidence of Its Modular Organization and Operating System: Insights into the Brain's Basic Units of Structure, Function, and Operation and How They Influence Neuronal Signaling and Behavior.

    Science.gov (United States)

    Baslow, Morris H

    2011-01-01

    The human brain is a complex organ made up of neurons and several other cell types, and whose role is processing information for use in eliciting behaviors. However, the composition of its repeating cellular units for both structure and function are unresolved. Based on recent descriptions of the brain's physiological "operating system", a function of the tri-cellular metabolism of N-acetylaspartate (NAA) and N-acetylaspartylglutamate (NAAG) for supply of energy, and on the nature of "neuronal words and languages" for intercellular communication, insights into the brain's modular structural and functional units have been gained. In this article, it is proposed that the basic structural unit in brain is defined by its physiological operating system, and that it consists of a single neuron, and one or more astrocytes, oligodendrocytes, and vascular system endothelial cells. It is also proposed that the basic functional unit in the brain is defined by how neurons communicate, and consists of two neurons and their interconnecting dendritic-synaptic-dendritic field. Since a functional unit is composed of two neurons, it requires two structural units to form a functional unit. Thus, the brain can be envisioned as being made up of the three-dimensional stacking and intertwining of myriad structural units which results not only in its gross structure, but also in producing a uniform distribution of binary functional units. Since the physiological NAA-NAAG operating system for supply of energy is repeated in every structural unit, it is positioned to control global brain function.

  4. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  5. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  6. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  7. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  8. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  9. Advanced, Integrated Control for Building Operations to Achieve 40% Energy Saving

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Yan; Song, Zhen; Loftness, Vivian; Ji, Kun; Zheng, Sam; Lasternas, Bertrand; Marion, Flore; Yuebin, Yu

    2012-10-15

    We developed and demonstrated a software based integrated advanced building control platform called Smart Energy Box (SEB), which can coordinate building subsystem controls, integrate variety of energy optimization algorithms and provide proactive and collaborative energy management and control for building operations using weather and occupancy information. The integrated control system is a low cost solution and also features: Scalable component based architecture allows to build a solution for different building control system configurations with needed components; Open Architecture with a central data repository for data exchange among runtime components; Extendible to accommodate variety of communication protocols. Optimal building control for central loads, distributed loads and onsite energy resource; uses web server as a loosely coupled way to engage both building operators and building occupants in collaboration for energy conservation. Based on the open platform of SEB, we have investigated and evaluated a variety of operation and energy saving control strategies on Carnegie Mellon University Intelligent Work place which is equipped with alternative cooling/heating/ventilation/lighting methods, including radiant mullions, radiant cooling/heating ceiling panels, cool waves, dedicated ventilation unit, motorized window and blinds, and external louvers. Based on the validation results of these control strategies, they were integrated in SEB in a collaborative and dynamic way. This advanced control system was programmed and computer tested with a model of the Intelligent Workplace's northern section (IWn). The advanced control program was then installed in the IWn control system; the performance was measured and compared with that of the state of the art control system to verify the overall energy savings great than 40%. In addition advanced human machine interfaces (HMI's) were developed to communicate both with building

  10. Main Control Room Upgrade for Kori Unit 1 in Korea

    International Nuclear Information System (INIS)

    Ha, Jae Taeg; Choi, Moon Jae

    2014-01-01

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles

  11. Main Control Room Upgrade for Kori Unit 1 in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Taeg; Choi, Moon Jae [KEPCO, Daejeon (Korea, Republic of)

    2014-08-15

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles.

  12. Control of TFTR during DT operations

    International Nuclear Information System (INIS)

    Pearson, G.G.; Alling, P.D.; Blanchard, W.; Camp, R.A.; Hawryluk, R.J.; Hosea, J.C.; Nagy, A.

    1995-01-01

    Since beginning routine D-T operations in December, 1993, there have been more than 500 DT plasmas and approximately 600,000 Ci of tritium processed through TFTR culminating in greater than 10 MW of fusion power produced in a single discharge in November, 1994. These performance levels were achieved while maintaining the highest levels of personnel and equipment safety. Prior to D-T operations, a Chain of Command structure and a TFTR Shift Supervisor (TFTRSS) position were developed for centralized control of the facility with all subsystems reporting to this position. A comprehensive surveillance system was incorporated such that the TFTR SS could easily review the operational readiness of subsystems for D-T operations. A TFTR SS Station was constructed to facilitate monitoring and control of TFTR. This station includes a camera system, FAX, a networked personal computer, a computerized tritium monitor and control system and a hardware interlock system. In the transition from D-D to D-T operations, TFTR's procedures were reviewed/revised and a number of additional procedures developed for control of activities at the facility. This paper details the equipment, administrative and organizational configurations used for controlling TFTR during D-T operations

  13. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  14. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  15. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  16. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  17. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  18. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  19. Hand held control unit for controlling a display screen-oriented computer game, and a display screen-oriented computer game having one or more such control units

    NARCIS (Netherlands)

    2001-01-01

    A hand-held control unit is used to control a display screen-oriented computer game. The unit comprises a housing with a front side, a set of control members lying generally flush with the front side for through actuating thereof controlling actions of in-game display items, and an output for

  20. Optimising the operation of hybrid coolers by means of efficient control equipment; Optimierung der Betriebsweise von Hybridkuehlern durch effiziente Steuerungstechnik

    Energy Technology Data Exchange (ETDEWEB)

    Odrich, T.; Koenig, H. [Jaeggi/Guentner (Schweiz) AG, Trimbach (Switzerland)

    2007-07-01

    Due to its functional principle and design, the hybrid dry cooler holds a high potential for saving water and energy. Purely convective heat discharge during dry operation in the case of a high annual rate of utilisation, evaporative cooling during the wetting cycle at peak load times or high ambient temperatures and infinitely adjustable fan speed in both operating modes permit a very substantial recooling performance at low operating costs and with little space requirement. However, the efficiency of hybrid dry coolers depends to a large degree on how intelligently the cooling functions are controlled and on the control strategy. The present article demonstrates that the control strategy contributes decisively to minimising water and energy consumption and costs. Besides describing the actual functions of a hybrid cooler control system it presents a control strategy for automatic lowering of the setpoint and hence optimisation of the refrigeration process. It discusses the option of operating multiple hybrid coolers by means of a hydraulic network and presents an optimised control concept for this purpose which is based on a master control unit. In conclusion the study shows that hybrid coolers need their own optimised control unit if maximum savings in energy and water are to be achieved.

  1. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  2. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River

  3. Development of an interface for an ultrareliable fault-tolerant control system and an electronic servo-control unit

    Science.gov (United States)

    Shaver, Charles; Williamson, Michael

    1986-01-01

    The NASA Ames Research Center sponsors a research program for the investigation of Intelligent Flight Control Actuation systems. The use of artificial intelligence techniques in conjunction with algorithmic techniques for autonomous, decentralized fault management of flight-control actuation systems is explored under this program. The design, development, and operation of the interface for laboratory investigation of this program is documented. The interface, architecturally based on the Intel 8751 microcontroller, is an interrupt-driven system designed to receive a digital message from an ultrareliable fault-tolerant control system (UFTCS). The interface links the UFTCS to an electronic servo-control unit, which controls a set of hydraulic actuators. It was necessary to build a UFTCS emulator (also based on the Intel 8751) to provide signal sources for testing the equipment.

  4. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  5. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  6. Assessment of the operating conditions of coordinated Q-V controller within secondary voltage control system

    Directory of Open Access Journals (Sweden)

    Arnautović Dušan

    2014-01-01

    Full Text Available The paper, discusses the possibility to use coordinated Q-V controller (CQVC to perform secondary voltage control at the power plant level. The CQVC performs the coordination of the synchronous generators' (SG reactive power outputs in order to maintain the same total reactive power delivered by the steam power plant (SPP, while at the same time maintaining a constant voltage with programmed reactive droop characteristic at the SPP HV busbar. This busbar is the natural pilot node for secondary voltage control at HV level as the node with maximum power production and maximum power consumption. In addition to voltage control, the CQVC maintains the uniform allocation of reactive power reserves at all SGs in the power plant. This is accomplished by setting the reactive power of each SG at given operating point in accordance to the available reactive power of the same SG at that point. Different limitations imposed by unit's and plant equipment are superimposed on original SG operating chart (provided by the manufacturer in order to establish realistic limits of SG operation at given operating point. The CQVC facilitates: i practical implementation of secondary voltage control in power system, as it is capable of ensuring delivery of reactive power as requested by regional/voltage control while maintaining voltage at system pilot node, ii the full deployment of available reactive power of SGs which in turn contributes to system stability, iii assessment of the reactive power impact/contribution of each generator in providing voltage control as ancillary service. Furthermore, it is also possible to use CQVC to pricing reactive power production cost at each SG involved and to design reactive power bidding structure for transmission network devices by using recorded data. Practical exploitation experience acquired during CQVC continuous operation for over two years enabled implementation of the optimal setting of reference voltage and droop on daily

  7. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1995-07-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment. The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, burn pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy, the US Environmental Protection Agency, and Washington State Department of Ecology during the preparation of the 100-HR-2 Operable Unit Work Plan (DOE-RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure as per the Hanford Past-Practice Strategy (DOE-RL 1991) and negotiations with the Department of Energy, US Environmental Protection Agency, and Washington State Department of Ecology. An interim remedial measure is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and 4) provide a human health and ecological QRA associated with solid waste burial grounds

  8. 14 CFR 25.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 25.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Powerplant Controls and Accessories § 25.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  9. 14 CFR 29.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 29.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Powerplant Controls and Accessories § 29.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  10. Real time test bed development for power system operation, control and cyber security

    Science.gov (United States)

    Reddi, Ram Mohan

    The operation and control of the power system in an efficient way is important in order to keep the system secure, reliable and economical. With advancements in smart grid, several new algorithms have been developed for improved operation and control. These algorithms need to be extensively tested and validated in real time before applying to the real electric power grid. This work focuses on the development of a real time test bed for testing and validating power system control algorithms, hardware devices and cyber security vulnerability. The test bed developed utilizes several hardware components including relays, phasor measurement units, phasor data concentrator, programmable logic controllers and several software tools. Current work also integrates historian for power system monitoring and data archiving. Finally, two different power system test cases are simulated to demonstrate the applications of developed test bed. The developed test bed can also be used for power system education.

  11. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  12. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  13. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    International Nuclear Information System (INIS)

    Biggerstaff, R.L.

    1994-01-01

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy's (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment

  14. Control structures design for fossil power station units; Diseno de estructuras de control para unidades termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Palomares Gonzalez, Daniel; Ricano Castillo, Juan Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1990-12-31

    In this paper are designed an analyzed the control ties of a 300MW fossil unit at different operation levels. The design and analysis were developed on an operation range of 50% to 100% load. The main control ties were studied among which are the feedwater flow, the superheating zone temperatures and the generated output. The technique used for the design is the decomposition in singular values (DSV) of the plant transference matrix. This is a recent technique that permits finding the most important interactions among output-input variables, over a significative frequencies range for the transference matrix of the plant. For this purpose utilizes the control properties of the transference matrix, such as: control effort, output-input interaction and ruggedness with respect to uncertainties. The control structures obtained were tested in a digital model of a fossil plant unit. A comparison study of both structures (original and modified) showed enhancement in the performance of the power plant with modified structure. [Espanol] En este trabajo se disenan y analizan los lazos de control de una unidad termoelectrica de 300 MW, a diferentes niveles de operacion. El diseno y analisis se desarrollo sobre un rango de operacion de 50 a 100 por ciento de carga. Se estudiaron los principales lazos de control entre los que se encuentran el flujo de agua de alimentacion, las temperaturas de la zona de sobrecalentamiento y la potencia generada. La tecnica utilizada para el diseno es la descomposicion en valores singulares (DVS) de la matriz de transferencia de la planta. Esta es una tecnica reciente que permite encontrar las interacciones mas importantes entre variables entrada-salida, sobre un rango de frecuencias significativas para la matriz de transferencia de la planta. Utiliza para ello las propiedades de control de la matriz de transferencia, como son: esfuerzo de control, interaccion entrada-salida y robustez con respecto a incertidumbres. Las estructuras de control

  15. Control structures design for fossil power station units; Diseno de estructuras de control para unidades termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Palomares Gonzalez, Daniel; Ricano Castillo, Juan Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1989-12-31

    In this paper are designed an analyzed the control ties of a 300MW fossil unit at different operation levels. The design and analysis were developed on an operation range of 50% to 100% load. The main control ties were studied among which are the feedwater flow, the superheating zone temperatures and the generated output. The technique used for the design is the decomposition in singular values (DSV) of the plant transference matrix. This is a recent technique that permits finding the most important interactions among output-input variables, over a significative frequencies range for the transference matrix of the plant. For this purpose utilizes the control properties of the transference matrix, such as: control effort, output-input interaction and ruggedness with respect to uncertainties. The control structures obtained were tested in a digital model of a fossil plant unit. A comparison study of both structures (original and modified) showed enhancement in the performance of the power plant with modified structure. [Espanol] En este trabajo se disenan y analizan los lazos de control de una unidad termoelectrica de 300 MW, a diferentes niveles de operacion. El diseno y analisis se desarrollo sobre un rango de operacion de 50 a 100 por ciento de carga. Se estudiaron los principales lazos de control entre los que se encuentran el flujo de agua de alimentacion, las temperaturas de la zona de sobrecalentamiento y la potencia generada. La tecnica utilizada para el diseno es la descomposicion en valores singulares (DVS) de la matriz de transferencia de la planta. Esta es una tecnica reciente que permite encontrar las interacciones mas importantes entre variables entrada-salida, sobre un rango de frecuencias significativas para la matriz de transferencia de la planta. Utiliza para ello las propiedades de control de la matriz de transferencia, como son: esfuerzo de control, interaccion entrada-salida y robustez con respecto a incertidumbres. Las estructuras de control

  16. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  17. Method for automatic control rod operation using rule-based control

    International Nuclear Information System (INIS)

    Kinoshita, Mitsuo; Yamada, Naoyuki; Kiguchi, Takashi

    1988-01-01

    An automatic control rod operation method using rule-based control is proposed. Its features are as follows: (1) a production system to recognize plant events, determine control actions and realize fast inference (fast selection of a suitable production rule), (2) use of the fuzzy control technique to determine quantitative control variables. The method's performance was evaluated by simulation tests on automatic control rod operation at a BWR plant start-up. The results were as follows; (1) The performance which is related to stabilization of controlled variables and time required for reactor start-up, was superior to that of other methods such as PID control and program control methods, (2) the process time to select and interpret the suitable production rule, which was the same as required for event recognition or determination of control action, was short (below 1 s) enough for real time control. The results showed that the method is effective for automatic control rod operation. (author)

  18. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  19. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  20. Pivoting output unit control systems activated by jacks. [for controlling aircraft flaps

    Science.gov (United States)

    Belliere, P.

    1978-01-01

    An invention to be used for controlling aircraft flaps is described. It is applicable to control systems with two coaxial output units which pivot simultaneously with respect to two fixed units and which are activated by two opposed, straight coaxial jacks.

  1. Operative training in otolaryngology in the United Kingdom: a specialist registrar survey

    NARCIS (Netherlands)

    Georgalas, Christos; Hadjihannas, Edward; Ghufoor, Khalid; Pracy, Paul; Papesch, Michael

    2005-01-01

    OBJECTIVE: To assess the current status of operative training for otolaryngology specialist registrars in the United Kingdom. DESIGN: Web-based questionnaire survey. PARTICIPANTS: All otolaryngology specialist registrars in the United Kingdom. MAIN OUTCOME MEASURES: The overall satisfaction with

  2. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  3. Analysis characteristics determination of electrohydraulic control system operation to reduce the operation time of a powered roof support

    Science.gov (United States)

    Szurgacz, Dawid

    2018-01-01

    The article discusses basic functions of a powered roof support in a longwall unit. The support function is to provide safety by protecting mine workings against uncontrolled falling of rocks. The subject of the research includes the measures to shorten the time of roof support shifting. The roof support is adapted to transfer, in hazard conditions of rock mass tremors, dynamic loads caused by mining exploitation. The article presents preliminary research results on the time reduction of the unit advance to increase the extraction process and thus reduce operating costs. Conducted stand tests showed the ability to increase the flow for 3/2-way valve cartridges. The level of fluid flowing through the cartridges is adequate to control individual actuators.

  4. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  5. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  6. Configuration management and change control at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Gheorghiu, Virgil

    1998-01-01

    Effective configuration management requires that: 1. the design basis of station structures, systems, equipment and components be maintained at all times; 2. only accurate and approved technical, operational and maintenance information is available for performance of station activities; 3. correct operating manuals, flowsheets, operating sequences, operating task and training manuals are prepared and maintained currently. Design Engineering at Cernavoda NPP is primarily the responsibility of the Engineering Services Department supported if necessary by the Technical Unit. The key elements needed to achieve excellence in design engineering support for station operation, including design process and implementation of modification are investigated by answering the questions: 1. What is the station expectation for design change control?; 2. How is this provided?. Concerning design, the following aspects are stressed: Detailed Design Development; Design Verification; Design Change Implementation. The present design process is auditable and well documented. It consists of detailed design development, and design output documents such as applicable drawings, procurement specifications, installation and test requirement and the results of design and safety reviews. The design change implementation does not proceed until an Inspection Test Plan has been developed and approved as required. (author)

  7. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  8. 40 CFR 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking...

    Science.gov (United States)

    2010-07-01

    ..., Catalytic Reforming Units, and Sulfur Recovery Units. (iii) The owner or operator shall install, operate... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and...

  9. Multi-variable neural-fuzzy control applied to the control of speed, power and temperature of turbo-gas units; Control neurodifuso multivariable aplicado al control de velocidad, potencia y temperatura de unidades turbogas

    Energy Technology Data Exchange (ETDEWEB)

    Segura O, Victor O; De Lara J, Salvador C [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Alvarado M, Victor M [Centro Nacional de Investigacion y Desarrollo Tecnologico (Cenidet), Cuernavaca, Morelos (Mexico)

    2005-07-01

    Gas turbines (GT) are high risk systems that operate at high velocities, temperatures and pressures. These conditions establish very strict requirements for the control system, reason why it is required a high automation level to obtain a safe and profitable operation. The control system of the turbo-gas units (TGU) is based on conventional control algorithms of type PI. This control scheme is destined for regulation and rejection of disturbance tasks, and not to follow reference points. All the controllers act on a single valve control, which represents a strong interaction between them. An alternative to treat this interaction and to improve the performance of the turbo-gas unit is the use of intelligent control techniques, adopting a pre-feedback scheme. The feedback control and the pre-feedback one are combined so that the first one assures the regulation around the operation points (for example, the synchronism velocity) and the second, provides the pursuit of the demanded trajectories established by the system. [Spanish] Las turbinas de gas (TG) son sistemas de alto riesgo que operan a altas velocidades, temperaturas y presiones. Estas condiciones establecen requerimientos muy estrictos para el sistema de control, por lo que se requiere en alto nivel de automatizacion para lograr una operacion segura y rentable. El sistema de control de las unidades turbogas (UTG) esta basado en algoritmos de control convencionales del tipo PI. Este esquema de control es destinado para tareas de regulacion y rechazo a perturbaciones, y no para seguimiento de puntos de referencia. Todos los controladores actuan sobre una sola valvula de control, lo que representa una fuerte interaccion entre los mismos. Una alternativa para tratar esta interaccion y mejorar el desempeno de la unidad turbogas es el empleo de tecnicas de control inteligente, adoptando un esquema retro-prealimentado. El control retroalimentado y el prealimentado se combinan para que el primero asegure la

  10. Method for controlling a nuclear fueled electric power generating unit and interfacing the same with a load dispatching system

    International Nuclear Information System (INIS)

    Mueller, N.P.; Meyer, C.E.

    1984-01-01

    A pressurized water reactor (PWR) nuclear fueled, electric power generating unit is controlled through the use of on-line calculations of the rapid, step and ramp, power change capabilities of the unit made from measured values of power level, axial offset, coolant temperature and rod position taking into account operator generated, safety and control, and balance of plant limits. The power change capabilities so generated may be fed to an automatic dispatch system which provides closed loop control of a power grid system. (author)

  11. Conceptual design of the X-IFU Instrument Control Unit on board the ESA Athena mission

    Science.gov (United States)

    Corcione, L.; Ligori, S.; Capobianco, V.; Bonino, D.; Valenziano, L.; Guizzo, G. P.

    2016-07-01

    Athena is one of L-class missions selected in the ESA Cosmic Vision 2015-2025 program for the science theme of the Hot and Energetic Universe. The Athena model payload includes the X-ray Integral Field Unit (X-IFU), an advanced actively shielded X-ray microcalorimeter spectrometer for high spectral resolution imaging, utilizing cooled Transition Edge Sensors. This paper describes the preliminary architecture of Instrument Control Unit (ICU), which is aimed at operating all XIFU's subsystems, as well as at implementing the main functional interfaces of the instrument with the S/C control unit. The ICU functions include the TC/TM management with S/C, science data formatting and transmission to S/C Mass Memory, housekeeping data handling, time distribution for synchronous operations and the management of the X-IFU components (i.e. CryoCoolers, Filter Wheel, Detector Readout Electronics Event Processor, Power Distribution Unit). ICU functions baseline implementation for the phase-A study foresees the usage of standard and Space-qualified components from the heritage of past and current space missions (e.g. Gaia, Euclid), which currently encompasses Leon2/Leon3 based CPU board and standard Space-qualified interfaces for the exchange commands and data between ICU and X-IFU subsystems. Alternative architecture, arranged around a powerful PowerPC-based CPU, is also briefly presented, with the aim of endowing the system with enhanced hardware resources and processing power capability, for the handling of control and science data processing tasks not defined yet at this stage of the mission study.

  12. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  13. Adaptation of Professional Skills in the Unit Operations Laboratory

    Science.gov (United States)

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  14. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  15. 100-HR-1 Operable Unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives (phases 1 and 2) and the detailed analysis of alternatives (phase 3). This focused feasibility study (FFS) constitutes the phase 3 portion of the FS process. The FFS process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific FFS document, such as this one. The FFS process is performed by implementing a ''plug-in'' style approach as defined in great detail in the Process Document. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for sites associated with the 100-HR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  16. Flow-Control Unit For Nitrogen And Hydrogen Gases

    Science.gov (United States)

    Chang, B. J.; Novak, D. W.

    1990-01-01

    Gas-flow-control unit installed and removed as one piece replaces system that included nine separately serviced components. Unit controls and monitors flows of nitrogen and hydrogen gases. Designed for connection via fluid-interface manifold plate, reducing number of mechanical fluid-interface connections from 18 to 1. Unit provides increasing reliability, safety, and ease of maintenance, and for reducing weight, volume, and power consumption.

  17. Operational behaviour of WWER nuclear power units after Chernobyl accident

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.

    2000-01-01

    The indicators of effectiveness of WWER operation, in 1987-1998 were analyzed. For three groups of nuclear units (WWER, NPP Kozloduy, NPP Paks), the trends of Indicators flow were established. The comparative analysis of forced outage rate, and load factor of WWERs and nuclear units all in the world was carried out; it gives the general picture of accident influence on the states and the relations of these indicators in considered period (author)

  18. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  19. Converted vehicle for battery electric drive. Aspects on the design of the software-driven vehicle control unit

    Energy Technology Data Exchange (ETDEWEB)

    Giessler, Martin; Paul, Jens; Gauterin, Frank [Karlsruher Institut fuer Technologie (KIT), Karlsruhe (Germany). Inst. fuer Fahrzeugsystemtechnik (FAST); Fritz, Alexander; Sander, Oliver; Mueller-Glaser, Klaus D. [Karlsruher Institut fuer Technologie (KIT), Karlsruhe (Germany). Inst. fuer Technik der Informationsverarbeitung (ITIV)

    2012-11-01

    At the Karlsruher Institute of Technology (KIT) a vehicle was converted for full battery electric drive within a cooperation of several faculties under the direction of the chair of vehicle technology. Within this paper the developed software to control the main functions of the vehicle will be presented and potentials to increase the energy efficiency will be discussed. The software based vehicle control unit is the central control unit to realize drivers command with respect to the system parameters, which are important for safety, dynamics, range and comfort of the vehicle. The structure of the software architecture, the interaction with the main electric vehicle specific control units and components and the main implemented functions will be described within this paper. The converted vehicle consists mainly of one electric motor with water cooled power electronics that drives the front axle, 21 battery modules controlled and managed by the battery management system, one on board charging device and an universal control unit. Not only strategies for power recovery while braking, but also strategies for driving and operation can help increase the energy efficiency. Select measures to recover and safe energy are also shown. (orig.)

  20. Simulator protection, control and supervision systems: a tool for empowerment of operation and maintenance; Simulador de sistemas de protecao, controle e supervisao: uma ferramenta para capacitacao da operacao e manutencao

    Energy Technology Data Exchange (ETDEWEB)

    Moutinho, J.A.P. [Centrais Eletricas do Norte do Brasil S.A. (ELETRONORTE), Belem, PA (Brazil). Regional de Transmissao do Para. Div. de Engenharia de Automacao, Protecao e Medicao], E-mail: beck@eln.gov.br

    2009-07-01

    The use of digital technology in protection, control and supervision equipment has resulted in the electricity sector companies, new behavior in electrical management systems given his versatility in the implementation of protection system as well as cost reduction in traffic information of power equipment to the man-machine interfaces (MMI) to the system operator. With the capabilities of digital technology it is possible provide simulated systems to allow the training of operations teams of the system, providing resources for development for engineers and maintenance technicians, and above all offer platform for analysis of events in the electrical system. This paper presents the development of a simulator protective relays, control and supervision applied to ELETRONORTE substations. The simulator of protective relays, control and supervision consists of information reproduction in the operator's MMI of the electrical system originated in the units of protection, control and supervision. This information is developed from a software that has the same communication protocol with the original units.

  1. INTEGRATED ROBOT-HUMAN CONTROL IN MINING OPERATIONS

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2005-04-01

    This report contains a detailed description of the work conducted in the first year of the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of ''software machine kinematics'' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A Bobcat{reg_sign} 435 excavator was retrofitted with electro-hydraulic control valve elements. The modular electronic control was tested and the basic valve characteristics were measured for each valve at the Robotics Laboratory at UNR. Position sensors were added to the individual joint control actuators, and the sensors were calibrated. An electronic central control system consisting of a portable computer, converters and electronic driver components was interfaced to the electro-hydraulic valves and position sensors. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's ''Lone Tree'' mine in Nevada.

  2. Hydrate Control for Gas Storage Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey Savidge

    2008-10-31

    The overall objective of this project was to identify low cost hydrate control options to help mitigate and solve hydrate problems that occur in moderate and high pressure natural gas storage field operations. The study includes data on a number of flow configurations, fluids and control options that are common in natural gas storage field flow lines. The final phase of this work brings together data and experience from the hydrate flow test facility and multiple field and operator sources. It includes a compilation of basic information on operating conditions as well as candidate field separation options. Lastly the work is integrated with the work with the initial work to provide a comprehensive view of gas storage field hydrate control for field operations and storage field personnel.

  3. Ageing Management of the reactor internals in Belgian nuclear units in view of Long Term Operation

    International Nuclear Information System (INIS)

    Gerard, R.; Bertolis, D.; Vissers, S.

    2012-01-01

    The reactor internals support the reactor core, distribute the coolant flow through the core, and guide and protect the rod control cluster assemblies and in-core instrumentation. Their integrity must be guaranteed in all operating and accident conditions. They are exposed to specific degradation mechanisms linked to the intense neutron irradiation, like Irradiation Assisted Stress Corrosion Cracking (IASCC) or potentially void swelling, in addition to more classical mechanisms like fatigue, wear and stress corrosion cracking. A rigorous follow-up of in-service degradation and an effective ageing management is therefore of crucial importance and contributes to the safe and economical operation of nuclear PWR units. (author)

  4. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...

  5. Peak thrust operation of linear induction machines from parameter identification

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z.; Eastham, T.R.; Dawson, G.E. [Queen`s Univ., Kingston, Ontario (Canada). Dept. of Electrical and Computer Engineering

    1995-12-31

    Various control strategies are being used to achieve high performance operation of linear drives. To maintain minimum volume and weight of the power supply unit on board the transportation vehicle, peak thrust per unit current operation is a desirable objective. True peak thrust per unit current through slip control is difficult to achieve because the parameters of linear induction machines vary during normal operation. This paper first develops a peak thrust per unit current control law based on the per-phase equivalent circuit for linear induction machines. The algorithm for identification of the variable parameters in induction machines is then presented. Application to an operational linear induction machine (LIM) demonstrates the utility of this algorithm. The control strategy is then simulated, based on an operational transit LIM, to show the capability of achieving true peak thrust operation for linear induction machines.

  6. Quick setup of test unit for accelerator control system

    International Nuclear Information System (INIS)

    Fu, W.; D'Ottavio, T.; Gassner, D.; Nemesure, S.; Morris, J.

    2011-01-01

    Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

  7. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  8. Decentralized control of units in smart grids for the support of renewable energy supply

    Energy Technology Data Exchange (ETDEWEB)

    Sonnenschein, Michael, E-mail: Michael.Sonnenschein@Uni-Oldenburg.DE [University of Oldenburg, Department of Computing Science, D-26111 Oldenburg (Germany); Lünsdorf, Ontje, E-mail: Ontje.Luensdorf@OFFIS.DE [OFFIS Institute for Information Technology, Escherweg 2, D-26121 Oldenburg (Germany); Bremer, Jörg, E-mail: Joerg.Bremer@Uni-Oldenburg.DE [University of Oldenburg, Department of Computing Science, D-26111 Oldenburg (Germany); Tröschel, Martin, E-mail: Martin.Troeschel@OFFIS.DE [OFFIS Institute for Information Technology, Escherweg 2, D-26121 Oldenburg (Germany)

    2015-04-15

    Due to the significant environmental impact of power production from fossil fuels and nuclear fission, future energy systems will increasingly rely on distributed and renewable energy sources (RES). The electrical feed-in from photovoltaic (PV) systems and wind energy converters (WEC) varies greatly both over short and long time periods (from minutes to seasons), and (not only) by this effect the supply of electrical power from RES and the demand for electrical power are not per se matching. In addition, with a growing share of generation capacity especially in distribution grids, the top-down paradigm of electricity distribution is gradually replaced by a bottom-up power supply. This altogether leads to new problems regarding the safe and reliable operation of power grids. In order to address these challenges, the notion of Smart Grids has been introduced. The inherent flexibilities, i.e. the set of feasible power schedules, of distributed power units have to be controlled in order to support demand–supply matching as well as stable grid operation. Controllable power units are e.g. combined heat and power plants, power storage systems such as batteries, and flexible power consumers such as heat pumps. By controlling the flexibilities of these units we are particularly able to optimize the local utilization of RES feed-in in a given power grid by integrating both supply and demand management measures with special respect to the electrical infrastructure. In this context, decentralized systems, autonomous agents and the concept of self-organizing systems will become key elements of the ICT based control of power units. In this contribution, we first show how a decentralized load management system for battery charging/discharging of electrical vehicles (EVs) can increase the locally used share of supply from PV systems in a low voltage grid. For a reliable demand side management of large sets of appliances, dynamic clustering of these appliances into uniformly

  9. Decentralized control of units in smart grids for the support of renewable energy supply

    International Nuclear Information System (INIS)

    Sonnenschein, Michael; Lünsdorf, Ontje; Bremer, Jörg; Tröschel, Martin

    2015-01-01

    Due to the significant environmental impact of power production from fossil fuels and nuclear fission, future energy systems will increasingly rely on distributed and renewable energy sources (RES). The electrical feed-in from photovoltaic (PV) systems and wind energy converters (WEC) varies greatly both over short and long time periods (from minutes to seasons), and (not only) by this effect the supply of electrical power from RES and the demand for electrical power are not per se matching. In addition, with a growing share of generation capacity especially in distribution grids, the top-down paradigm of electricity distribution is gradually replaced by a bottom-up power supply. This altogether leads to new problems regarding the safe and reliable operation of power grids. In order to address these challenges, the notion of Smart Grids has been introduced. The inherent flexibilities, i.e. the set of feasible power schedules, of distributed power units have to be controlled in order to support demand–supply matching as well as stable grid operation. Controllable power units are e.g. combined heat and power plants, power storage systems such as batteries, and flexible power consumers such as heat pumps. By controlling the flexibilities of these units we are particularly able to optimize the local utilization of RES feed-in in a given power grid by integrating both supply and demand management measures with special respect to the electrical infrastructure. In this context, decentralized systems, autonomous agents and the concept of self-organizing systems will become key elements of the ICT based control of power units. In this contribution, we first show how a decentralized load management system for battery charging/discharging of electrical vehicles (EVs) can increase the locally used share of supply from PV systems in a low voltage grid. For a reliable demand side management of large sets of appliances, dynamic clustering of these appliances into uniformly

  10. 21 CFR 111.127 - What quality control operations are required for packaging and labeling operations?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... and Process Control System: Requirements for Quality Control § 111.127 What quality control operations are required for packaging and labeling operations? Quality control operations for packaging and...

  11. Test plan for the field evaluation and demonstration of the Contamination Control Unit

    International Nuclear Information System (INIS)

    Winberg, M.R.; Thompson, D.N.

    1993-06-01

    This report describes test details of a full demonstration of the Contamination Control Unit (CCU). The CCU is a mobile trailer capable of employing the use of soil fixatives, dust suppression agents, misting, and vacuum systems. These systems can perform a large number of contamination control functions to support the Office of Waste Technology Development (OTD) Buried Waste Integrated Demonstration (BWID) projects, transuranic (TRU) waste retrieval operations, and emergency response for hazardous and radioactive materials incidents. The demonstration will include both performance testing at the North Holmes Laboratory Facility (NHLF) and field testing in conjunction with the Remote Excavation System Demonstration at the Cold Test Pit. The NHLF will test operational parameters using water only, and the field demonstration at the Cold Test Pit involves full scale operation of vacuum, fixant, misting, and dust suppression systems. Test objectives, detailed experimental procedures, and data quality objectives necessary to perform the field demonstration are included in this test plan

  12. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    International Nuclear Information System (INIS)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea

    2014-01-01

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators

  13. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators.

  14. An Appraisal Of The Operation And Management Of Unit Trust ...

    African Journals Online (AJOL)

    An Appraisal Of The Operation And Management Of Unit Trust Schemes In Nigeria. ... Open Access DOWNLOAD FULL TEXT ... instead of being invested in shares or in money market instruments as a result of widespread financial illiteracy.

  15. An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management

    Science.gov (United States)

    2010-12-01

    An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY

  16. Optimal replacement and inspection periods of safety and control boards in Wolsung nuclear power plant unit 1

    International Nuclear Information System (INIS)

    Mok, Jin Il

    1993-02-01

    In nuclear power plants, the safety and control systems are important for operating and maintaining safety of nuclear power plants. Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Since the start of first commercial operation of Kori nuclear power plant (NPP) unit 1, the trips caused by instrument and control systems account for 28% of total trips of NPPs in Korea. Even a single trip of a nuclear power plant causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this work we investigated the optimal replacement periods of the digital control computer's (DCC) and the programmable digital comparator's (PDC) electronic circuit boards of Wolsung nuclear power plant Unit 1. We first derived mathematical models which calculate optimal replacement periods for electronic circuit boards of digital control computer (DCC) and for those of the programmable digital comparator (PDC) in Wolsung NPP unit 1. And we analytically obtained the optimal replacement periods of electronic circuit boards by using these models. We compared these periods with the replacement periods currently used at Wolsung NPP Unit. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained for the electronic circuit boards of DCC and those used in the field shown small difference : the optimal replacement periods analytically obtained for the electronic circuit boards of PDC are shorter than those used in the field in general. The engineered safeguards of Wolsung nuclear power plant unit 1 contains redundant systems of 2-out-of-3 logic which are not operating under normal conditions but they are called

  17. Clinical microbiology in the intensive care unit: Strategic and operational characteristics

    Directory of Open Access Journals (Sweden)

    Bhattacharya S

    2010-01-01

    Full Text Available Infection is a major cause of morbidity and mortality among patients admitted in intensive care units (ICUs. The application of the principles and the practice of Clinical Microbiology for ICU patients can significantly improve clinical outcome. The present article is aimed at summarising the strategic and operational characteristics of this unique field where medical microbiology attempts to venture into the domain of direct clinical care of critically ill patients. The close and strategic partnership between clinical microbiologists and intensive care specialists, which is essential for this model of patient care have been emphasized. The article includes discussions on a variety of common clinical-microbiological problems faced in the ICUs such as ventilator-associated pneumonia, blood stream infections, skin and soft tissue infection, UTI, infection control, besides antibiotic management.

  18. Explanation of significant differences for the TNX groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1997-01-01

    This Explanation of Significant Differences (ESD) is being issued by the Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concurrence by the Environmental Protection Agency-Region IV (EPA) and South Carolina Department of Health and Environmental Control (SCDHEC) to announce changes in the interim remediation strategy selected for the TNX Groundwater Operable Unit. The TNX Area is located adjacent to the Savannah River in the southwestern portion of SRS. The remedy selected in the Interim Record of Decision (IROD) to achieve the interim action goals was the Hybrid Groundwater Corrective Action (HGCA). The HGCA consisted of a recirculation well system and an air stripper with a series of groundwater extraction wells. The original remediation strategy needs to be modified because the recirculation well system was determined to be ineffective in this area due to geological factors and the nature of the contamination

  19. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  20. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  1. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  2. Design of a Mathematical Unit in FPGA for the Implementation of the Control of a Magnetic Levitation System

    Directory of Open Access Journals (Sweden)

    Juan José Raygoza-Panduro

    2008-01-01

    Full Text Available This paper presents the design and implementation of an automatically generated mathematical unit, from a program developed in Java that describes the VHDL circuit, ready to be synthesized with the Xilinx ISE tool. The core contains diverse complex operations such as mathematical functions including sine and cosine, among others. The proposed unit is used to synthesize a sliding mode controller for a magnetic levitation system. This kind of systems is used in industrial applications requiring high level of mathematical calculations in small time periods. The core is designed to calculate trigonometric and arithmetic operations in such a way that each function is performed in a clock cycle. In this paper, the results of the mathematical core are shown in terms of implementation, utilization, and application to control a magnetic levitation system.

  3. Final environmental statement related to operation of Indian Point Nuclear Generating Plant, Unit No. 3: (Docket No. 50-286): Volume 1

    International Nuclear Information System (INIS)

    1975-02-01

    The proposed action is the issuance of a license to consolidated Edison Company of New York, Inc., for the operation of the Indian Point Nuclear Generating Plant, Unit No. 3, located in the State of New York, Westchester County, Village of Buchanan, 24 miles north of the New York City boundary line. Although the present action is the issuance of an operating license for Unit No. 3, this Statement considers the environmental impacts from simultaneous operation of all three Units. A Final Environmental Statement has been issued for Unit No. 2. Furthermore, in view of the proximity to the Indian Point site of existing and presently proposed power plants on the Hudson River, the cumulative environmental benefits and impacts of the plants within a 30-mile reach of the river have been assessed. The proposed action is interreleated to other actions taken by other Federal agencies such as the Environmental Protection Agency, in regard to granting or denying application for discharge permits under the National Pollutant Discharge Elimination System (NPDES) instituted through the Federal Water Pollution Control Act Amendments of 1972, and the Federal Power Commission, in licensing of other facilities on the Hudson River. 128 figs., 210 tabs

  4. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  5. Engineering Process Monitoring for Control Room Operation

    CERN Document Server

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close collaboration of control room teams, exploitation personnel and process specialists. In this paper some principles for the engineering of monitoring information for control room operation are developed at the example of the exploitation of a particle accelerator at the European Laboratory for Nuclear Research (CERN).

  6. Expert operator preferences in remote manipulator control systems

    International Nuclear Information System (INIS)

    Sundstrom, E.; Draper, J.V.; Fausz, A.; Woods, H.

    1995-06-01

    This report describes a survey of expert remote manipulator operators designed to identify features of control systems related to operator efficiency and comfort. It provides information for designing the control center for the Single-Shell Tank Waste Retrieval Manipulator System (TWRMS) Test Bed, described in a separate report. Research questions concerned preferred modes of control, optimum work sessions, sources of operator fatigue, importance of control system design features, and desired changes in control rooms. Participants comprised four expert remote manipulator operators at Oak Ridge National Laboratory, who individually have from 9 to 20 years of experience using teleoperators. The operators had all used rate and position control, and all preferred bilateral (force-reflecting) position control. They reported spending an average of 2.75 h in control of a teleoperator system during a typical shift. All were accustomed to working in a crew of two and alternating control and support roles in 2-h rotations in an 8-h shift. Operators reported that fatigue in using remote manipulator systems came mainly from watching TV monitors and making repetitive motions. Three of four experienced symptoms, including headaches and sore eyes, wrists, and back. Of 17 features of control rooms rated on importance, highest ratings went to comfort and support provided by the operator chair, location of controls, location of video monitors, video image clarity, types of controls, and control modes. When asked what they wanted to change, operators said work stations designed for comfort; simpler, lighter hand-controls; separate controls for each camera; better placement of remote camera; color monitors; and control room layouts that support crew interaction. Results of this small survey reinforced the importance of ergonomic factors in remote manipulation

  7. Quality and productivity drive innovation and improvement at United Technologies Aerospace Operations, Inc.

    Science.gov (United States)

    Jamar, L. G.

    1986-01-01

    Quality and innovation are the hallmarks of the national space program. In programs that preceded the Shuttle Program the emphasis was on meeting the risks and technical challenges of space with safety, quality, reliability, and success. At United Technologies Aerospace Operations, Inc. (UTAO), the battle has developed along four primary fronts. These fronts include programs to motivate and reward people, development and construction of optimized processes and facilities, implementation of specifically tailored management systems, and the application of appropriate measurement and control systems. Each of these initiatives is described. However, to put this quality and productivity program in perspective, UTAO and its role in the Shuttle Program are described first.

  8. On Point: The United States Army in Operation Iraqi Freedom

    Science.gov (United States)

    2004-01-01

    to retain operational context. Moreover, times noted in the text have been adjusted from Greenwich Mean Time (“ Zulu ”) to local Kuwait time (+ 3...TF 1-64 AR unit history is composed of short narratives for each subordinate unit. Most cite times in zulu . 34. Ibid. 35. Ibid. Numbers of enemy...places in the world. Inside the city cemetery is the Tomb of Ali, son-in-law and cousin to Mohammed and founder of the Shiite sect. Coalition leaders

  9. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  10. Distributed model based control of multi unit evaporation systems

    International Nuclear Information System (INIS)

    Yudi Samyudia

    2006-01-01

    In this paper, we present a new approach to the analysis and design of distributed control systems for multi-unit plants. The approach is established after treating the effect of recycled dynamics as a gap metric uncertainty from which a distributed controller can be designed sequentially for each unit to tackle the uncertainty. We then use a single effect multi-unit evaporation system to illustrate how the proposed method is used to analyze different control strategies and to systematically achieve a better closed-loop performance using a distributed model-based controller

  11. Computer control of shielded cell operations

    International Nuclear Information System (INIS)

    Jeffords, W.R. III.

    1987-01-01

    This paper describes in detail a computer system to remotely control shielded cell operations. System hardware, software, and design criteria are discussed. We have designed a computer-controlled buret that provides a tenfold improvement over the buret currently in service. A computer also automatically controls cell analyses, calibrations, and maintenance. This system improves conditions for the operators by providing a safer, more efficient working environment and is expandable for future growth and development

  12. Operating room fire prevention: creating an electrosurgical unit fire safety device.

    Science.gov (United States)

    Culp, William C; Kimbrough, Bradly A; Luna, Sarah; Maguddayao, Aris J

    2014-08-01

    To reduce the incidence of surgical fires. Operating room fires represent a potentially life-threatening hazard and are triggered by the electrosurgical unit (ESU) pencil. Carbon dioxide is a fire suppressant and is a routinely used medical gas. We hypothesize that a shroud of protective carbon dioxide covering the tip of the ESU pencil displaces oxygen, thereby preventing fire ignition. Using 3-dimensional modeling techniques, a polymer sleeve was created and attached to an ESU pencil. This sleeve was connected to a carbon dioxide source and directed the gas through multiple precisely angled ports, generating a cone of fire-suppressive carbon dioxide surrounding the active pencil tip. This device was evaluated in a flammability test chamber containing 21%, 50%, and 100% oxygen with sustained ESU activation. The sleeve was tested with and without carbon dioxide (control) until a fuel was ignited or 30 seconds elapsed. Time to ignition was measured by high-speed videography. Fires were ignited with each control trial (15/15 trials). The control group median ± SD ignition time in 21% oxygen was 3.0 ± 2.4 seconds, in 50% oxygen was 0.1 ± 1.8 seconds, and in 100% oxygen was 0.03 ± 0.1 seconds. No fire was observed when the fire safety device was used in all concentrations of oxygen (0/15 trials; P fire ignition was 76% to 100%. A sleeve creating a cone of protective carbon dioxide gas enshrouding the sparks from an ESU pencil effectively prevents fire in a high-flammability model. Clinical application of this device may reduce the incidence of operating room fires.

  13. Lithium control during normal operation

    International Nuclear Information System (INIS)

    Suryanarayan, S.; Jain, D.

    2010-01-01

    Periodic increases in lithium (Li) concentrations in the primary heat transport (PHT) system during normal operation are a generic problem at CANDU® stations. Lithiated mixed bed ion exchange resins are used at stations for pH control in the PHT system. Typically tight chemistry controls including Li concentrations are maintained in the PHT water. The reason for the Li increases during normal operation at CANDU stations such as Pickering was not fully understood. In order to address this issue a two pronged approach was employed. Firstly, PNGS-A data and information from other available sources was reviewed in an effort to identify possible factors that may contribute to the observed Li variations. Secondly, experimental studies were carried out to assess the importance of these factors in order to establish reasons for Li increases during normal operation. Based on the results of these studies, plausible mechanisms/reasons for Li increases have been identified and recommendations made for proactive control of Li concentrations in the PHT system. (author)

  14. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of peformance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays, etc.) and the human operator. In the Remote Control Engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  15. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of performance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays) and the human operator. In the remote control engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  16. Advanced control room caters for the operator

    International Nuclear Information System (INIS)

    George, C.R.; Rygg, D.E.

    1980-01-01

    In existing control rooms the operators' efficiency is often limited by widely scattered and sometimes illogically arranged controls which tend to increase the potential for outages or equipment damage. The advanced control room described allows instant and ready access to preselected information and control by one or two operators from a seated or standing position. (author)

  17. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  18. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  19. New digital control system for the operation of the Colombian research reactor IAN-R1

    International Nuclear Information System (INIS)

    Celis del A, L.; Rivero, T.; Bucio, F.; Ramirez, R.; Segovia, A.; Palacios, J.

    2015-09-01

    En 2011, Mexico won the Colombian international tender for the renewal of instrumentation and control of the IAN-R1 Reactor, to Argentina and the United States. This paper presents the design criteria and the development made for the new digital control system installed in the Colombian nuclear reactor IAN-R1, which is based on a redundant and diverse architecture, which provides increased availability, reliability and safety in the reactor operation. This control system and associated instrumentation met all national export requirements, with the safety requirements established by the IAEA as well as the requirements demanded by the Colombian Regulatory Body in nuclear matter. On August 20, 2012, the Colombian IAN-R1 reactor reached its first criticality controlled with the new system developed at Instituto Nacional de Investigaciones Nucleares (ININ). On September 14, 2012, the new control system of the Colombian IAN-R1 reactor was officially handed over to the Colombian authorities, this being the first time that Mexico exported nuclear technology through the ININ. Currently the reactor is operating successfully with the new control system, and has an operating license for 5 years. (Author)

  20. Control of peripheral units by satellite computer

    International Nuclear Information System (INIS)

    Tran, K.T.

    1974-01-01

    A computer system was developed allowing the control of nuclear physics experiments, and use of the results by means of graphical and conversational assemblies. This system which is made of two computers, one IBM-370/135 and one Telemecanique Electrique T1600, controls the conventional IBM peripherals and also the special ones made in the laboratory, such as data acquisition display and graphics units. The visual display is implemented by a scanning-type television, equipped with a light-pen. These units in themselves are universal, but their specifications were established to meet the requirements of nuclear physics experiments. The input-output channels of the two computers have been connected together by an interface, designed and implemented in the Laboratory. This interface allows the exchange of control signals and data (the data are changed from bytes into word and vice-versa). The T1600 controls the peripherals mentionned above according to the commands of the IBM370. Hence the T1600 has here the part of a satellite computer which allows conversation with the main computer and also insures the control of its special peripheral units [fr

  1. Peri-operative glycaemic control regimens for preventing surgical site infections in adults.

    Science.gov (United States)

    Kao, Lillian S; Meeks, Derek; Moyer, Virginia A; Lally, Kevin P

    2009-07-08

    RCTs met the pre-specified inclusion criteria for this review. No trials evaluated strict glycaemic control in the immediate pre-operative period or outside the intensive care unit. Due to heterogeneity in patient populations, peri-operative period, glycaemic target, route of insulin administration, and definitions of outcome measures, combination of the results of the five included trials into a meta-analysis was not appropriate. The methodological quality of the trials was variable. In terms of outcomes, only one trial demonstrated a significant reduction in SSIs with strict glycaemic control, but the quality of this trial was difficult to assess as a result of poor reporting; furthermore the baseline rate of SSIs was high (30%). The other trials were either underpowered to detect a difference in SSIs, due to a low baseline rate (less than or equal to 5%), or did not report SSIs as a single outcome but as part of a composite. Of the three trials reporting hypoglycaemia (which was not consistently defined) all had a higher rate in the strict glycaemic control group but none attributed significant morbidity to the hypoglycaemia. Adequacy of glucose control between groups was measured differently among studies. Studies could not be compared due to differences in target ranges, and were susceptible to measurement bias due to differences in frequency of measurement and lack of blinding by the providers following the glycaemic protocols. Infection-related mortality was not reported in any of the trials, and no trials demonstrated a significant difference in all-cause mortality. Length of hospital stay was significantly reduced in the strict glycaemic control groups in only one trial. There is insufficient evidence to support strict glycaemic control versus conventional management (maintenance of glucose operative period or outside the setting of an intensive care unit. The trials were limited by small sample size, inconsistencies in the definitions of the outcome measures

  2. REDUNDANT ELECTRIC MOTOR DRIVE CONTROL UNIT DESIGN USING AUTOMATA-BASED APPROACH

    Directory of Open Access Journals (Sweden)

    Yuri Yu. Yankin

    2014-11-01

    Full Text Available Implementation of redundant unit for motor drive control based on programmable logic devices is discussed. Continuous redundancy method is used. As compared to segregated standby redundancy and whole system standby redundancy, such method provides preservation of all unit functions in case of redundancy and gives the possibility for continuous monitoring of major and redundant elements. Example of that unit is given. Electric motor drive control channel block diagram contains two control units – the major and redundant; it also contains four power supply units. Control units programming was carried out using automata-based approach. Electric motor drive control channel model was developed; it provides complex simulation of control state-machine and power converter. Through visibility and hierarchy of finite state machines debug time was shortened as compared to traditional programming. Control state-machine description using hardware description language is required for its synthesis with FPGA-devices vendor design software. This description was generated automatically by MATLAB software package. To verify results two prototype control units, two prototype power supply units, and device mock-up were developed and manufactured. Units were installed in the device mock-up. Prototype units were created in accordance with requirements claimed to deliverable hardware. Control channel simulation and tests results in the perfect state and during imitation of major element fault are presented. Automata-based approach made it possible to observe and debug control state-machine transitions during simulation of transient processes, occurring at imitation of faults. Results of this work can be used in development of fault tolerant electric motor drive control channels.

  3. Control system modernization of a turbo-gas unit of CFE in the Comarca Lagunera; Modernizacion del sistema de control de una unidad turbogas de la CFE en la Comarca Lagunera

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez P, Marino; De Lara J, Salvador; Hernandez Muniz, Alfredo [Industria SIGRAMA, Cuernavaca, Morelos (Mexico); Garcia Cabello, Raymundo [Comision Federal de Electricidad (Mexico)

    2004-07-01

    At the present time, the turbo-gas units (TGU) make an important contribution in the development and growth of the national power sector, since this type of units pertaining to the Comision Federal de Electricidad (CFE) contributes with the 6.23% of the national production, that is to say, 2600 MW approx. The turbo-gas units are aero-derivative gas turbines used for power generation, pumping and compression. Generally, they are used to support urgent requests in the demand of electricity or, for the permanent supply of electrical energy in isolated zones. In addition, they are used to quickly get into and get out of operation, which requires high availability, trustworthiness and flexibility. In this sense, and with the intention of improving the operation of the TGUs, the Gerencia de Control e Instrumentation (GCI) (Management of Control and Instrumentation) of the Instituto de Investigaciones Electricas (IIE), has developed a control technology for this type of units, able to replace the original control systems of units with even 30 years of continuous operation or to be installed in new units. [Spanish] En la actualidad, las unidades de turbogas (UTG) tienen una importante contribucion en el desarrollo y crecimiento del sector energetico nacional, pues este tipo de unidades pertenecientes a la Comision Federal de Electricidad (CFE) aportan el 6.23% de la produccion nacional, es decir, 2600 MW aproximadamente. Las unidades turbogas son turbinas de gas aeroderivativas empleadas para la generacion electrica, bombeo y compresion. Por lo general, son utilizadas para apoyar solicitudes urgentes en la demanda de electricidad o bien, para el suministro permanente de energia electrica en zonas aisladas. Ademas, se usan para entrar y salir rapidamente en operacion, lo que requiere alta disponibilidad, confiabilidad y flexibilidad. En este sentido, y con la intencion de mejorar las UTG, la Gerencia de Control e Instrumentacion (GCI) del Instituto de Investigaciones

  4. PREMATH: a Precious-Material Holdup Estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.; Bruns, D.D.

    1982-01-01

    A computer program, PREMATH (Precious Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. PREMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels - including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, PREMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balances for thorium (a less valuable material than uranium) during steady-state process operation

  5. NUMATH: a nuclear-material-holdup estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.

    1981-01-01

    A computer program, NUMATH (Nuclear Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. NUMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels-including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, NUMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balance for thorium during steady-state process operation

  6. Survey of controllability in decentralized CHP plants. Optimal operation of priority production units; Kortlaegning af decentrale kraftvarmevaerkers regulerbarhed. Optimal drift af prioriterede anlaeg - Teknologisk grundlag

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-03-15

    The present report presents results from two closely related projects, carried out in parallel, under the PSO-F and U 2002. The one project is 'Survey of controllability in de-centralized combined heat and power plants' project number PSO 4724 and is fully reported here. The other project: 'Optimal operation of priority production units, project number PSO 4712, only the part project 'Technological foundations is reported here. In project 4724 the technical conditions that matter regarding controllability of electricity production in de-centralized heat and power stations are surveyed. In this context the term controllability means how fast and to which extent the load factors of the plants can be changed. Also, is has been investigated which options are available for improving the controllability, their potentials and estimates on required investments associated. The investigation covers CHP plants having a production capacity of up to 30 MW of electricity. The main part of the de-centralized CHP plants are based on spark ignited internal combustion engines (Otto engines). Most of these engines are fuelled by natural gas and a smaller part by biogas. A minor number are gas turbines fuelled by natural gas and steam turbines in industrial applications, waste incineration plants or in combined cycle power plants. The mapping has among others consisted of a number of visits on selected different types of plants including interview with people responsible for the daily operation. From these interviews data on the actual operating strategy and technical data have been provided. In addition suppliers of engines and other equipment involved have been contacted for technical information or recommendations regarding possible changes in operation strategy. Searching the Internet has been widely used for identification of technical investigations concerning e.g. operation and maintenance of relevant equipment. Finally, substantial statistical data from

  7. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  8. Intelligent tutors for control center operator training

    Energy Technology Data Exchange (ETDEWEB)

    Vale, Z.A. [Porto Univ. (Portugal). Dept. of Electrical and Computer Engineering; Fernandes, M.F.; Marques, A. [Electricity of Portugal, Sacavem (Portugal)

    1995-12-31

    Power systems are presently remotely operated and controlled from control centers that receive on-line information about the power system state. Control center operators have very high-demanding tasks what makes their training a key issue for the performance of the whole power system. Simulators are usually used by electrical utilities for this purpose but they are very expensive applications and their use requires the preparation of the training sessions by qualified training staff which is a very time consuming task. Due to this, these simulators are only used a few times a year. Intelligent Tutoring Systems (ITS) provide some new possibilities for control center operator training making easier its use without much assistance of the teaching staff. On the other hand, an expert system in use in a control center can be adapted to an ITS to train operators without much effort. 18 refs

  9. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  10. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  11. Operation and control of a hybrid microgrid containing unbalanced and nonlinear loads

    Energy Technology Data Exchange (ETDEWEB)

    Shahnia, Farhad; Majumder, Ritwik; Ghosh, Arindam; Ledwich, Gerard; Zare, Firuz [School of Engineering, Queensland University of Technology, 2 George Street, Brisbane, Queensland 4001 (Australia)

    2010-08-15

    This paper shows how the power quality can be improved in a microgrid that is supplying a nonlinear and unbalanced load. The microgrid contains a hybrid combination of inertial and converter interfaced distributed generation units where a decentralized power sharing algorithm is used to control its power management. One of the distributed generators in the microgrid is used as a power quality compensator for the unbalanced and harmonic load. The current reference generation for power quality improvement takes into account the active and reactive power to be supplied by the micro-source which is connected to the compensator. Depending on the power requirement of the nonlinear load, the proposed control scheme can change modes of operation without any external communication interfaces. The compensator can operate in two modes depending on the entire power demand of the unbalanced nonlinear load. The proposed control scheme can even compensate system unbalance caused by the single-phase micro-sources and load changes. The efficacy of the proposed power quality improvement control and method in such a microgrid is validated through extensive simulation studies using PSCAD/EMTDC software with detailed dynamic models of the micro-sources and power electronic converters. (author)

  12. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986

  13. Heat recovery unit operation of HVAC system in IMEF

    International Nuclear Information System (INIS)

    Paek, S. R.; Oh, Y. W.; Song, E. S.; Park, D. K.; Joo, Y. S.; Hong, K. P.

    2003-01-01

    HVAC system including a supply and exhaust air system in IMEF(Irradiated Materials Examination Facility) is an essential facility for preventing a leakage of radioactive materials and for a preservation of a working environment. It costs a lot to operate the HVAC system in IMEF because our ventilation type is once-through system, and an air flow is maintained from low level contamination area to high level and maintained high turns of ventilation air under certain conditions. As HRU(Heat Recovery Unit) at HVAC system based on PIEF(Post Irradiation Examination Facility) operation experiences is designed and adopted, it prevents from a heating coil freezing destruction in winter and makes much energy saving etc.. Heat pipe type HRU is adopted in IMEF, and a construction and operation result of HRU is examined

  14. District heating systems' control for cost effective and environmentally compatible operation

    International Nuclear Information System (INIS)

    Balati, J.

    1999-01-01

    District heating systems are being developed in accordance with the growing of large European cities. These systems are formed by enlarging networks of heat distribution from heat sources to heat consumers and, simultaneously, by gradually connecting newly built heat sources. District heating control consists in optimum control of the output of heat sources and in control of heat distribution and consumption. The aim of the paper is to inform about the works in the field of creating a mathematical-physical model of extensive hot water and steam supply circle network and heat sources for the purpose of creating unconventional control algorithms for the complex control of the technological sequence ''heat production distribution- consumption''. For the optimum control algorithms the artificial intelligence methods are also utilised. The aim of the complex access to the solution of new control algorithms will be to decrease the cost of the consumed heat unit and increase environmental protection. The function of the Extensive Heating System District Heating System (DHS) is to ensure permanently the economically justified requirements of heat supply for all consumers with minimum cost per heat supply unit and with enhanced level of environmental protection. The requirements of heat consumers have to be in harmony with the requirements of the maximum possible economy of the whole DHS when adhering to the required qualitative parameters of supplied energy. Therefore, it offers the application of optimised control methods as artificial intelligence methods for the control of the operational circle of DHS heat networks. It is obvious that a higher level of DHS control is required from the technological, economic and ecological point of view. (author)

  15. Denver Radium Site -- Operable Unit I closeout report for the US Environmental Protection Agency

    International Nuclear Information System (INIS)

    1992-08-01

    The Denver Radium Site consists of properties in the Denver, Colorado, area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 gaps or operable units to facilitate remedial action of the Site. Operable Unit I is an 8-acre block bounded by Quivas Street to the east, Shoshone Street to the west, West 12th Avenue to the south, and West 13th Avenue to the north. The primary focus of interest concerning investigations of radiological contamination was a radium, vanadium, and uranium processing facility at 1201 Quivas Street owned by the Pittsburgh Radium Company (PRC) from 1925 until 1926. The Radium Ores Company, which was associated with PRC, operated the facility until 1927. A Remedial investigation (RI) of Operable Unit I was prepared by Jacobs Engineering Group and CH 2 M Hill on behalf of EPA in April 1986. The draft Feasibility Study (FS), prepared by Jacobs Engineering Group and CH 2 M Hill, was issued in July 1987 (the final FS is the Community Relations Responsiveness Summary with an errata to the draft, issued September 1987). The RI focused on radium uranium processing residues discarded in the early 1900s. These residues contained uranium, radium, and thorium. EPA s Community Relations Plan involved the community in the decision-making process relating to the remedy to be implemented at Operable Unit X, and promoted communications among interested parties throughout the course of the project. The remedial action alternative preferred by EPA for Operable Unit I was Off-Site Permanent Disposal. Because a permanent disposal facility was not available at the time the Record of Decision was issued in September 1987, EPA selected the On-Site Temporary Containment (capping) with the Off-Site Permanent Disposal alternative

  16. 40 CFR 60.2989 - Does this subpart directly affect incineration unit owners and operators in my State?

    Science.gov (United States)

    2010-07-01

    ... incineration unit owners and operators in my State? 60.2989 Section 60.2989 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... incineration unit owners and operators in my State? (a) No, this subpart does not directly affect incineration...

  17. Integrated Robot-Human Control in Mining Operations

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2007-09-30

    This report contains a detailed description of the work conducted for the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of 'software machine kinematics' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A working prototype has been developed using a Bobcat 435 excavator. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's 'Lone Tree' mine in Nevada. Analysis of these working trajectories has been completed. The motion patterns, when transformed into a family of curves, may serve as the basis for software-controlled machine kinematics transformation in the new human-robot control system. A Cartesian control example has been developed and tested both in simulation and on the experimental excavator. Open-loop control is robustly stable and free of short-term dynamic problems, but it allows for drifting away from the desired motion kinematics of the

  18. 78 FR 14361 - U.S. Steel Tubular Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United...

    Science.gov (United States)

    2013-03-05

    ... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, PA; Notice of Initiation of Investigation To Terminate Certification of Eligibility Pursuant to... Tubular Products, McKeesport Tubular Operations Division, Subsidiary of United States Steel Corporation...

  19. Operational Control of Internal Transport

    NARCIS (Netherlands)

    J.R. van der Meer (Robert)

    2000-01-01

    textabstractOperational Control of Internal Transport considers the control of guided vehicles in vehicle-based internal transport systems found in facilities such as warehouses, production plants, distribution centers and transshipment terminals. The author's interest of research having direct use

  20. Multi-Unit Aspects of the Pickering Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Morison, W. G. [Atomic Energy of Canada Ltd, Sheridan Park, ON (Canada)

    1968-04-15

    The Pickering nuclear generating station is located on the north shore of Lake Ontario, about 20 miles east of the city of Toronto, Canada. The station has been planned and laid out on an eight-unit station, four units of which have now been authorized for construction. Each of these four units consists of a single heavy-water moderated and cooled CANDU-type reactor and auxiliaries coupled to a single tandem compound turbine generator with a net output of approximately 500 MW(e). The units are identical and are scheduled to come into operation at intervals of one year from 1970 to 1973. The station has been planned with central facilities for: administration maintenance laboratories, stores, change rooms, decontamination and waste management services. A common control centre, cooling water intake and discharge system, and spent fuel storage bay for four units has been arranged. A feature of the multi-unit station is a common containment system. Cost savings in building a number of identical units on the same site result from a single exclusion area, shared engineering costs, equipment purchase contracts for four identical components, and efficient use of construction plant. Operating cost savings are anticipated in the use of a common operating and maintenance staff and spare parts inventory. The plant has been arranged to minimize problems of operating, commissioning and constructing units at the same time on the same site. The layout and construction sequence have been arranged so that the first unit can be commissioned and operated with little or no interference from the construction forces working on succeeding units. During the construction phase barriers will be erected in the common control centre between operating control equipment and that being installed. Operations and construction personnel will enter the plant by separate routes and work in areas separated by physical barriers. (author)

  1. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  2. Overview of the Habitat Demonstration Unit Power System Integration and Operation at Desert RATS 2010

    Science.gov (United States)

    Colozza, Anthony J.; George, Pat; Gambrell, Ronnie; Chapman, Chris

    2013-01-01

    A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.

  3. Hierarchical control of motor units in voluntary contractions.

    Science.gov (United States)

    De Luca, Carlo J; Contessa, Paola

    2012-01-01

    For the past five decades there has been wide acceptance of a relationship between the firing rate of motor units and the afterhyperpolarization of motoneurons. It has been promulgated that the higher-threshold, larger-soma, motoneurons fire faster than the lower-threshold, smaller-soma, motor units. This relationship was based on studies on anesthetized cats with electrically stimulated motoneurons. We questioned its applicability to motor unit control during voluntary contractions in humans. We found that during linearly force-increasing contractions, firing rates increased as exponential functions. At any time and force level, including at recruitment, the firing rate values were inversely related to the recruitment threshold of the motor unit. The time constants of the exponential functions were directly related to the recruitment threshold. From the Henneman size principle it follows that the characteristics of the firing rates are also related to the size of the soma. The "firing rate spectrum" presents a beautifully simple control scheme in which, at any given time or force, the firing rate value of earlier-recruited motor units is greater than that of later-recruited motor units. This hierarchical control scheme describes a mechanism that provides an effective economy of force generation for the earlier-recruited lower force-twitch motor units, and reduces the fatigue of later-recruited higher force-twitch motor units-both characteristics being well suited for generating and sustaining force during the fight-or-flight response.

  4. Analysis of the Capabilities Supporting Humanitarian Assistance and Disaster Relief Operations of the Indonesian Navy (TNI AL) and the United States Marine Corps Marine Expeditionary Unit (USMC MEU)

    Science.gov (United States)

    2015-12-01

    Operating Procedure SPMAGTF Special Purpose Marine Air Ground Task Force SSB Single Side Band STP Shock Trauma Platoon TACRON Tactical Air Control...Platoon ( STP ) that is capable of conducting emergency treatment and triage. The remaining corpsmen are dispersed throughout the individual sub-units of...Jane’s navigating the emerging markets , Indonesia. Retrieved from Jane’s Information Group https://janes.ihs.com.libproxy.nps.edu/CustomPages/Janes

  5. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    International Nuclear Information System (INIS)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-01-01

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  6. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  7. CV controls from design to operation

    CERN Document Server

    Blanc, D

    2002-01-01

    The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational structure at the end of 98. The main objective of this operation was to ensure the CV group to be more competitive and efficient through the growing tasks of the LHC projects. The main evolution given to this reorganisation is that the new structure is more project oriented and then operates on three distinct axes: Design, Work and Operation. Process control project management requires a complete and early interaction and participation of all the actors involved. This procedure to be efficient and constructive must be considered and performed not only during the design stage but along the project planning phases and must go beyond the completion work including the process control operation activity. The paper explains the present project management for process control. It describes the present constraints and gives suggestions to a different approach to these projects to improve performances and efficiency of a contr...

  8. Personal customizing exercise with a wearable measurement and control unit.

    Science.gov (United States)

    Wang, Zhihui; Kiryu, Tohru; Tamura, Naoki

    2005-06-28

    Recently, wearable technology has been used in various health-related fields to develop advanced monitoring solutions. However, the monitoring function alone cannot meet all the requirements of customizing machine-based exercise on an individual basis by relying on biosignal-based controls. We propose a new wearable unit design equipped with measurement and control functions to support the customization process. The wearable unit can measure the heart rate and electromyogram signals during exercise performance and output workload control commands to the exercise machines. The workload is continuously tracked with exercise programs set according to personally customized workload patterns and estimation results from the measured biosignals by a fuzzy control method. Exercise programs are adapted by relying on a computer workstation, which communicates with the wearable unit via wireless connections. A prototype of the wearable unit was tested together with an Internet-based cycle ergometer system to demonstrate that it is possible to customize exercise on an individual basis. We tested the wearable unit in nine people to assess its suitability to control cycle ergometer exercise. The results confirmed that the unit could successfully control the ergometer workload and continuously support gradual changes in physical activities. The design of wearable units equipped with measurement and control functions is an important step towards establishing a convenient and continuously supported wellness environment.

  9. Personal customizing exercise with a wearable measurement and control unit

    Directory of Open Access Journals (Sweden)

    Tamura Naoki

    2005-06-01

    Full Text Available Abstract Background Recently, wearable technology has been used in various health-related fields to develop advanced monitoring solutions. However, the monitoring function alone cannot meet all the requirements of customizing machine-based exercise on an individual basis by relying on biosignal-based controls. We propose a new wearable unit design equipped with measurement and control functions to support the customization process. Methods The wearable unit can measure the heart rate and electromyogram signals during exercise performance and output workload control commands to the exercise machines. The workload is continuously tracked with exercise programs set according to personally customized workload patterns and estimation results from the measured biosignals by a fuzzy control method. Exercise programs are adapted by relying on a computer workstation, which communicates with the wearable unit via wireless connections. A prototype of the wearable unit was tested together with an Internet-based cycle ergometer system to demonstrate that it is possible to customize exercise on an individual basis. Results We tested the wearable unit in nine people to assess its suitability to control cycle ergometer exercise. The results confirmed that the unit could successfully control the ergometer workload and continuously support gradual changes in physical activities. Conclusion The design of wearable units equipped with measurement and control functions is an important step towards establishing a convenient and continuously supported wellness environment.

  10. An Actuator Control Unit for Safety-Critical Mechatronic Applications with Embedded Energy Storage Backup

    Directory of Open Access Journals (Sweden)

    Sergio Saponara

    2016-03-01

    Full Text Available This paper presents an actuator control unit (ACU with a 450-J embedded energy storage backup to face safety critical mechatronic applications. The idea is to ensure full operation of electric actuators, even in the case of battery failure, by using supercapacitors as a local energy tank. Thanks to integrated switching converter circuitry, the supercapacitors provide the required voltage and current levels for the required time to guarantee actuator operation until the system enters into safety mode. Experimental results are presented for a target application related to the control of servomotors for a robotized prosthetic arm. Mechatronic devices for rehabilitation or assisted living of injured and/or elderly people are available today. In most cases, they are battery powered with lithium-based cells, providing high energy density and low weight, but at the expense of a reduced robustness compared to lead-acid- or nickel-based battery cells. The ACU of this work ensures full operation of the wearable robotized arm, controlled through acceleration and electromyography (EMG sensor signals, even in the case of battery failure, thanks to the embedded energy backup unit. To prove the configurability and scalability of the proposed solution, experimental results related to the electric actuation of the car door latch and of a robotized gearbox in vehicles are also shown. The reliability of the energy backup device has been assessed in a wide temperature range, from −40 to 130 °C, and in a durability test campaign of more than 10,000 cycles. Achieved results prove the suitability of the proposed approach for ACUs requiring a burst of power of hundreds of watts for only a few seconds in safety-critical applications. Alternatively, the aging and temperature characterizations of energy backup units is limited to supercapacitors of thousands of farads for high power applications (e.g., electric/hybrid propulsion and with a temperature range limited to

  11. Intelligent Control and Operation of Distribution System

    DEFF Research Database (Denmark)

    Bhattarai, Bishnu Prasad

    methodology to ensure efficient control and operation of the future distribution networks. The major scientific challenge is thus to develop control models and strategies to coordinate responses from widely distributed controllable loads and local generations. Detailed models of key Smart Grid (SG) elements...... in this direction but also benefit distribution system operators in the planning and development of the distribution network. The major contributions of this work are described in the following four stages: In the first stage, an intelligent Demand Response (DR) control architecture is developed for coordinating...... the key SG actors, namely consumers, network operators, aggregators, and electricity market entities. A key intent of the architecture is to facilitate market participation of residential consumers and prosumers. A Hierarchical Control Architecture (HCA) having primary, secondary, and tertiary control...

  12. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system......Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...

  13. Limitation for performance of jobs in power unit control room of nuclear power plant

    International Nuclear Information System (INIS)

    Janas, D.

    1988-01-01

    The procedure is described for an analysis of the somatic and mental health condition of operating personnel in the unit control room of a nuclear power plant. It was divided into three stages, viz.: (1) determination of adverse and favorable effects of work; (2) the recording of social, psychological, physiological and biochemical changes in the personnel; (3) determination of possibilities of controlling the limit for performance of a job. The analysis showed that the problem is complex and should permanently remain in the centre of attention. (J.B.). 3 refs

  14. Intelligence system for reactor operator informational support

    International Nuclear Information System (INIS)

    Prangishvili, I.V.; Pashchenko, F.F.; Saprykin, E.M.

    1989-01-01

    Problems related to creation and introduction at NPP of highly efficient and reliable systems for monitoring and control of working processes and intelligence-endowed systems of operator informational support (ISOIS) are considered. The main units included in ISOIS are considered. The main units included in ISOIS are described. The unit of current state monitoring provides information for the operator, which is necessary under concrete conditions for the process monitoring and control, so as to avoid emergencies and affers a program of actions in a dialogue mode for the operator. The identification unit is designed for the obtaining of assessed values of process parameters (neutron fields, temperatures, pressures) and basic equipment (reactivity coefficients, fuel rod weights, time of delay). The prediction unit evaluates the behaviour of process parameters and process state in various situations. 9 refs

  15. Turbine and its turbine control system of full scope simulator for Qinshan 300 MW Nuclear Power Unit

    International Nuclear Information System (INIS)

    Zhang Dongwei; Zhu Jinping

    1996-01-01

    The simulation for Qinshan 300 MW Nuclear Power Unit turbine and turbine control system is briefly introduced. The simulation system includes lube oil system, jacking oil pump system, turning gear system, turbine supervisor system and turbine control system. It not only correctly simulates the process of turbine normal start up, operation, and shut down, but also the response of turbine under the malfunction conditions

  16. Trainer module for security control center operations

    International Nuclear Information System (INIS)

    Bernard, E.A.

    1982-01-01

    An operator trainer module has been developed to be used with the security control center equipment to be installed as part of a safeguards physical protection system. The module is designed to provide improved training and testing capabilities for control center operators through the use of simulations for perimeter equipment operations. Operators, through the trainer module, can be challenged with a variety of realistic situations which require responsive action identical to that needed in an actual system. This permits a consistent evaluation and confirmation of operator capabilities prior to assignment as an operator and allows for periodic retesting to verify that adequate performance levels are maintained

  17. Applying interactive control to waste processing operations

    International Nuclear Information System (INIS)

    Grasz, E.L.; Merrill, R.D.; Couture, S.A.

    1992-08-01

    At present waste and residue processing includes steps that require human interaction. The risk of exposure to unknown hazardous materials and the potential for radiation contamination motivates the desire to remove operators from these processes. Technologies that facilitate this include glove box robotics, modular systems for remote and automated servicing, and interactive controls that minimize human intervention. LLNL is developing an automated system which is designed to supplant the operator for glove box tasks, thus protecting the operator from the risk of radiation exposure and minimizing operator-associated waste. Although most of the processing can be automated with minimal human interaction, there are some tasks where intelligent intervention is both desirable and necessary to adapt to Enexpected circumstances and events. These activities require that the operator interact with the process using a remote manipulator which provides or reflects a natural feel to the operator. The remote manipulation system which was developed incorporates sensor fusion and interactive control, and provides the operator with an effective means of controlling the robot in a potentially unknown environment. This paper describes recent accomplishments in technology development and integration, and outlines the future goals of Lawrence Livermore National Laboratory for achieving this integrated interactive control capability

  18. Model predictive control for a thermostatic controlled system

    DEFF Research Database (Denmark)

    Shafiei, Seyed Ehsan; Rasmussen, Henrik; Stoustrup, Jakob

    2013-01-01

    This paper proposes a model predictive control scheme to provide temperature set-points to thermostatic controlled cooling units in refrigeration systems. The control problem is formulated as a convex programming problem to minimize the overall operating cost of the system. The foodstuff temperat......This paper proposes a model predictive control scheme to provide temperature set-points to thermostatic controlled cooling units in refrigeration systems. The control problem is formulated as a convex programming problem to minimize the overall operating cost of the system. The foodstuff...

  19. Application of fuzzy logic operation and control to BWRs

    International Nuclear Information System (INIS)

    Junichi Tanji; Mitsuo Kinoshita; Takaharu Fukuzaki; Yasuhiro Kobayashi

    1993-01-01

    Fuzzy logic control schemes employing linguistic decision rules for flexible operator control strategies have undergone application tests in dynamic systems. The advantages claimed for fuzzy logic control are its abilities: (a) to facilitate direct use of skillful operator know-how for automatic operation and control of the systems and (b) to provide robust multivariable control for complex plants. The authors have also studied applications of fuzzy logic control to automatic startup operations and load-following control in boiling water reactors, pursuing these same advantages

  20. Controlling operational risk: Concepts and practices

    NARCIS (Netherlands)

    van den Tillaart, A.H.A.J.

    2003-01-01

    The subject of this thesis is controlling 'operational risk' in banks. Operational risk is defined as the risk of losses resulting from inadequate or failed internal processes, people, systems, or from external events. Within this very broad subject, we focus on the place of operational risk

  1. Influence of in-plant air pollution control measures on power plant and system operation

    International Nuclear Information System (INIS)

    Kurten, H.

    1990-01-01

    The burning of fossil fuels causes the emission of air pollutants which have harmful environmental impact. Consequently many nations have in the last few years established regulations for air pollution control and have initiated the development and deployment of air pollution control systems in power plants. The paper describes the methods used for reducing particulate, SO 2 and NO x emissions, their application as backfit systems and in new plants, the power plant capacity equipped with such systems in the Federal Republic of Germany and abroad and the additional investment and operating costs incurred. It is to be anticipated that advanced power plant designs will produce lower pollutant emissions and less waste at enhanced efficiency levels. A comparison with power generation in nuclear power plants completes the first part of the paper. This paper covers the impact of the above-mentioned air pollution control measures on unit commitment in daily operation

  2. 40 CFR 60.1200 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...

  3. Means for controlling operation of power sources associated with an axial tomographic system

    International Nuclear Information System (INIS)

    1976-01-01

    An axial tomographic system is described having scanner means normally in an off-condition where all associated power sources are electrically isolated from the units driven thereby. It also includes means for activating the scanner means to establish an on-condition, control means including means to measure one or more system parameters when the scanner means is in an on-condition and to determine if the measured parameters are within predetermined limits, and means for maintaining the on-condition only if the control means is properly operational and all measured system parameters are within the predetermined limits

  4. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  5. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  6. Nuclear power plant control room operator control and monitoring tasks

    International Nuclear Information System (INIS)

    Bovell, C.R.; Beck, M.G.; Carter, R.J.

    1998-01-01

    Oak Ridge National Laboratory is conducting a research project the purpose of which is to develop the technical bases for regulatory review criteria for use in evaluating the safety implications of human factors associated with the use of artificial intelligence and expert systems, and with advanced instrumentation and control (I and C) systems in nuclear power plants (NPP). This report documents the results from Task 8 of that project. The primary objectives of the task was to identify the scope and type of control and monitoring tasks now performed by control-room operators. Another purpose was to address the types of controls and safety systems needed to operate the nuclear plant. The final objective of Task 8 was to identify and categorize the type of information and displays/indicators required to monitor the performance of the control and safety systems. This report also discusses state-of-the-art controls and advanced display devices which will be available for use in control-room retrofits and in control room of future plants. The fundamental types of control and monitoring tasks currently conducted by operators can be divided into four classifications: function monitoring tasks, control manipulation tasks, fault diagnostic tasks, and administrative tasks. There are three general types of controls used in today's NPPs, switches, pushbuttons, and analog controllers. Plant I and C systems include components to achieve a number of safety-related functions: measuring critical plant parameters, controlling critical plant parameters within safety limits, and automatically actuating protective devices if safe limits are exceeded. The types of information monitored by the control-room operators consist of the following parameters: pressure, fluid flow and level, neutron flux, temperature, component status, water chemistry, electrical, and process and area radiation. The basic types of monitoring devices common to nearly all NPP control rooms include: analog meters

  7. Stress, performance, and control room operations

    International Nuclear Information System (INIS)

    Fontaine, C.W.

    1990-01-01

    The notion of control room operator performance being detrimentally affected by stress has long been the focus of considerable conjecture. It is important to gain a better understanding of the validity of this concern for the development of effective severe-accident management approaches. This paper illustrates the undeniable negative impact of stress on a wide variety of tasks. A computer-controlled simulated work environment was designed in which both male and female operators were closely monitored during the course of the study for both stress level (using the excretion of the urine catecholamines epinephrine and norepinephrine as an index) and job performance. The experimental parameters employed by the study when coupled with the subsequent statistical analyses of the results allow one to make some rather striking comments with respect to how a given operator might respond to a situation that he or she perceives to be psychologically stressful (whether the stress be externally or internally generated). The findings of this study clearly indicated that stress does impact operator performance on tasks similar in nature to those conducted by control room operators and hence should be seriously considered in the development of severe-accident management strategies

  8. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  9. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  10. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  11. Nuclear thermal rocket engine operation and control

    International Nuclear Information System (INIS)

    Gunn, S.V.; Savoie, M.T.; Hundal, R.

    1993-06-01

    The operation of a typical Rover/Nerva-derived nuclear thermal rocket (NTR) engine is characterized and the control requirements of the NTR are defined. A rationale for the selection of a candidate diverse redundant NTR engine control system is presented and the projected component operating requirements are related to the state of the art of candidate components and subsystems. The projected operational capabilities of the candidate system are delineated for the startup, full-thrust, shutdown, and decay heat removal phases of the engine operation. 9 refs

  12. Chemistry control at Bruce NGS 'B' from constructed to commercial operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    1987-01-01

    Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met

  13. Automated Air Traffic Control Operations with Weather and Time-Constraints: A First Look at (Simulated) Far-Term Control Room Operations

    Science.gov (United States)

    Prevot, Thomas; Homola, Jeffrey R.; Martin, Lynne H.; Mercer, Joey S.; Cabrall, Christopher C.

    2011-01-01

    In this paper we discuss results from a recent high fidelity simulation of air traffic control operations with automated separation assurance in the presence of weather and time-constraints. We report findings from a human-in-the-loop study conducted in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. During four afternoons in early 2010, fifteen active and recently retired air traffic controllers and supervisors controlled high levels of traffic in a highly automated environment during three-hour long scenarios, For each scenario, twelve air traffic controllers operated eight sector positions in two air traffic control areas and were supervised by three front line managers, Controllers worked one-hour shifts, were relieved by other controllers, took a 3D-minute break, and worked another one-hour shift. On average, twice today's traffic density was simulated with more than 2200 aircraft per traffic scenario. The scenarios were designed to create peaks and valleys in traffic density, growing and decaying convective weather areas, and expose controllers to heavy and light metering conditions. This design enabled an initial look at a broad spectrum of workload, challenge, boredom, and fatigue in an otherwise uncharted territory of future operations. In this paper we report human/system integration aspects, safety and efficiency results as well as airspace throughput, workload, and operational acceptability. We conclude that, with further refinements. air traffic control operations with ground-based automated separation assurance can be an effective and acceptable means to routinely provide very high traffic throughput in the en route airspace.

  14. Primary water chemistry control at units of Paks Nuclear Power Plant

    International Nuclear Information System (INIS)

    Schunk, J.; Patek, G.; Pinter, T.; Tilky, P.; Doma, A.; Osz, J.

    2010-01-01

    The primary water chemistry of the four identical units of Paks Nuclear Power Plant has been developed based on Western-type PWR units, taking into consideration some Soviet-Russian modifications. The political changes in 90s have also influenced the water chemistry specifications and directions. At PWR units the transition operational modes have been developed while in case of VVER units - in lack of central uniform regulation - this question has become the competence and responsibility of each individual plant. This problem has resulted in separate water chemistry developments with a considerable time delay. The needs for life-time extensions all over the World have made the development of start-up and shut-down chemistry procedures extremely important, since they considerably influence the long term and safe operation of plants. The uniformly structured limit value system, the principles applied for the system development, and the logic schemes for actions to be taken are discussed in the paper, both for normal operation and transition modes. (author)

  15. Primary Water Chemistry Control at Units of Paks Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Schunk, J.; Pinter, G. Patek T.; Tilky, P.; Doma, A. [Paks Nuclear Power Plant Co. Ltd., Paks (Hungary); Osz, J. [Budapest University of Technology and Economics, Budapest (Hungary)

    2013-03-15

    The primary water chemistry of the four identical units of Paks Nuclear Power Plant has been developed based on Western type PWR units, taking into consideration some Russian modifications. The political changes in the 1990s have also influenced the water chemistry specifications and directions. At PWR units the transition operational modes have been developed while in case of WWER units - in lack of central uniform regulation - this question has become the competence and responsibility of each individual plant. This problem has resulted in separate water chemistry developments with a considerable time delay. The need for lifetime extensions worldwide has made the development of startup and shutdown chemistry procedures extremely important, since they considerably influence the long term and safe operation of plants. The uniformly structured limit value system, the principles applied for the system development, and the logic schemes for actions to be taken are discussed in the paper, both for normal operation and transition modes. (author)

  16. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  17. Advanced Motor Control Test Facility for NASA GRC Flywheel Energy Storage System Technology Development Unit

    Science.gov (United States)

    Kenny, Barbara H.; Kascak, Peter E.; Hofmann, Heath; Mackin, Michael; Santiago, Walter; Jansen, Ralph

    2001-01-01

    This paper describes the flywheel test facility developed at the NASA Glenn Research Center with particular emphasis on the motor drive components and control. A four-pole permanent magnet synchronous machine, suspended on magnetic bearings, is controlled with a field orientation algorithm. A discussion of the estimation of the rotor position and speed from a "once around signal" is given. The elimination of small dc currents by using a concurrent stationary frame current regulator is discussed and demonstrated. Initial experimental results are presented showing the successful operation and control of the unit at speeds up to 20,000 rpm.

  18. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  19. How Can the United States Army Improve Human Intelligence in Peace Operations?

    National Research Council Canada - National Science Library

    Wright, David

    2003-01-01

    .... These secondary collectors, such as the Military Police, Psychological Operations, Civil Affairs and Line Units conduct liaison with international and local police forces, host-government official...

  20. Superfund Record of Decision (EPA Region 6): United Nuclear Corporation, Mckinley County, New Mexico, ground-water operable unit (first remedial action) September 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The United Nuclear Corporation (UNC) site is located approximately 17 miles northeast of Gallup, New Mexico in McKinley County. The site operated as a State-licensed uranium mill facility from June 1977 to May 1982. It includes an ore-processing mill (about 25 acres) and an unlined tailings pond area (about 100 acres). In July 1979, approximately 23 million gallons of tailings and pond water were released to a nearby river as a result of a dam breach in the tailings pond area. The site damage was repaired; however, attention was focused on ground-water contamination resulting from tailings seepage. Nevertheless, the offsite migration of radionuclides and chemical constituents from uranium milling byproduct materials into the ground water, as well as to surface water and air, are still principal threats at the site. The remedial action will address onsite ground water contamination. Source control and onsite surface reclamation will be implemented under the direction of the Nuclear Regulatory Commission and integrated with this ground water operable unit. The primary contaminants of concern affecting the ground water are metals including arsenic, and radioactive substances including radium-226/228 and gross alpha. The selected remedial action for the site is included

  1. Steam generator tube integrity requirements and operating experience in the United States

    International Nuclear Information System (INIS)

    Karwoski, K.J.

    2009-01-01

    Steam generator tube integrity is important to the safe operation of pressurized-water reactors. For ensuring tube integrity, the U.S. Nuclear Regulatory Commission uses a regulatory framework that is largely performance based. This performance-based framework is supplemented with some prescriptive requirements. The framework recognizes that there are three combinations of tube materials and heat treatments currently used in the United States and that the operating experience depends, in part, on the type of material used. This paper summarizes the regulatory framework for ensuring steam generator tube integrity, it highlights the current status of steam generators, and it highlights some of the steam generator issues and challenges that exist in the United States. (author)

  2. Data-driven modeling and predictive control for boiler-turbine unit using fuzzy clustering and subspace methods.

    Science.gov (United States)

    Wu, Xiao; Shen, Jiong; Li, Yiguo; Lee, Kwang Y

    2014-05-01

    This paper develops a novel data-driven fuzzy modeling strategy and predictive controller for boiler-turbine unit using fuzzy clustering and subspace identification (SID) methods. To deal with the nonlinear behavior of boiler-turbine unit, fuzzy clustering is used to provide an appropriate division of the operation region and develop the structure of the fuzzy model. Then by combining the input data with the corresponding fuzzy membership functions, the SID method is extended to extract the local state-space model parameters. Owing to the advantages of the both methods, the resulting fuzzy model can represent the boiler-turbine unit very closely, and a fuzzy model predictive controller is designed based on this model. As an alternative approach, a direct data-driven fuzzy predictive control is also developed following the same clustering and subspace methods, where intermediate subspace matrices developed during the identification procedure are utilized directly as the predictor. Simulation results show the advantages and effectiveness of the proposed approach. Copyright © 2014 ISA. Published by Elsevier Ltd. All rights reserved.

  3. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  4. Application of total care time and payment per unit time model for physician reimbursement for common general surgery operations.

    Science.gov (United States)

    Chatterjee, Abhishek; Holubar, Stefan D; Figy, Sean; Chen, Lilian; Montagne, Shirley A; Rosen, Joseph M; Desimone, Joseph P

    2012-06-01

    The relative value unit system relies on subjective measures of physician input in the care of patients. A payment per unit time model incorporates surgeon reimbursement to the total care time spent in the operating room, postoperative in-house, and clinic time to define payment per unit time. We aimed to compare common general surgery operations by using the total care time and payment per unit time method in order to demonstrate a more objective measurement for physician reimbursement. Average total physician payment per case was obtained for 5 outpatient operations and 4 inpatient operations in general surgery. Total care time was defined as the sum of operative time, 30 minutes per hospital day, and 30 minutes per office visit for each operation. Payment per unit time was calculated by dividing the physician reimbursement per case by the total care time. Total care time, physician payment per case, and payment per unit time for each type of operation demonstrated that an average payment per time spent for inpatient operations was $455.73 and slightly more at $467.51 for outpatient operations. Partial colectomy with primary anastomosis had the longest total care time (8.98 hours) and the least payment per unit time ($188.52). Laparoscopic gastric bypass had the highest payment per time ($707.30). The total care time and payment per unit time method can be used as an adjunct to compare reimbursement among different operations on an institutional level as well as on a national level. Although many operations have similar payment trends based on time spent by the surgeon, payment differences using this methodology are seen and may be in need of further review. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  5. Explicit isospectral flows for the AKNS operator on the unit interval

    International Nuclear Information System (INIS)

    Amour, L

    2009-01-01

    We consider the AKNS operator on the unit interval. The boundary conditions are self-adjoint separated boundary conditions. For fixed boundary conditions, we make the formulae for flows induced by general tangent vector fields on isospectral sets explicit

  6. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  7. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  8. Operational aerial snow surveying in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Peck, E L; Carroll, T R; Vandemark, S C

    1980-03-01

    An airborne gamma radiation detector and data acquisition system has been designed for rapid measurement of the snow cover water equivalent over large open areas. Research and field tests conducted prior to the implementation of an operational snow measurement system in the United States are reviewed. Extensive research test flights were conducted over large river basins of the north-central plains and in the high mountain valleys of the inter-mountain West. Problems encountered during development include: (1) error in the gross gamma flux produced by atmospheric radon gas daughters; (2) spatial and temporal variability in soil moisture; and (3) errors in gamma radiation count rate introduced by aircraft and cosmic background radiation. Network design of operational flight line and ground observation data used in a river forecasting system are discussed. 22 references, 4 figures, 2 tables.

  9. Improved control system power unit for large parachutes

    Science.gov (United States)

    Chandler, J. A.; Grubbs, T. M.

    1968-01-01

    Improved control system power unit drives the control surfaces of very large controllable parachutes. The design features subassemblies for determining control surface position and cable loading, and protection of the load sensor against the possibility of damage during manipulation.

  10. Lithium-Ion Cell Charge Control Unit

    Science.gov (United States)

    Reid, Concha; Button, Robert; Manzo, Michelle; McKissock, Barbara; Miller, Thomas; Gemeiner, Russel; Bennett, William; Hand, Evan

    2006-01-01

    Life-test data of Lithium-Ion battery cells is critical in order to establish their performance capabilities for NASA missions and Exploration goals. Lithium-ion cells have the potential to replace rechargeable alkaline cells in aerospace applications, but they require a more complex charging scheme than is typically required for alkaline cells. To address these requirements in our Lithium-Ion Cell Test Verification Program, a Lithium-Ion Cell Charge Control Unit was developed by NASA Glenn Research Center (GRC). This unit gives researchers the ability to test cells together as a pack, while allowing each cell to charge individually. This allows the inherent cell-to-cell variations to be addressed on a series string of cells and results in a substantial reduction in test costs as compared to individual cell testing. The Naval Surface Warfare Center at Crane, Indiana developed a power reduction scheme that works in conjunction with the Lithium-Ion Cell Charge Control Unit. This scheme minimizes the power dissipation required by the circuitry to prolong circuit life and improve its reliability.

  11. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    International Nuclear Information System (INIS)

    Mellor, S.P.; Matthee, F.W.

    2002-01-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  12. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Energy Technology Data Exchange (ETDEWEB)

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  13. Ergonomic design for operator flexibility

    International Nuclear Information System (INIS)

    Pope, R.H.

    1980-01-01

    The Three Mile Island accident highlighted the importance of ergonomic design of control rooms. Emphasis has been on a reappraisal of the reactor/operator interface, but in the United Kingdom the CEGB maintains that safe efficient operation needs a centralised information system optimised for all control room staff. (author)

  14. Engineering Process Monitoring for Control Room Operation

    OpenAIRE

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close coll...

  15. Controlled Operation of the Islanded Portion of the International Council on Large Electric Systems (CIGRE) Low Voltage Distribution Network

    DEFF Research Database (Denmark)

    Mustafa, Ghullam; Bak, Claus Leth; Ali, Ehsan

    2017-01-01

    In islanding, a portion of the power network, comprised of the loads and distributed generation (DG) units, is isolated from the rest of the power grid and forms a micro grid (MG). In this condition, it becomes essential for the islanded MG to operate in a stable and controlled manner by providing...... ancillary services. When the MG is cut off from the main grid, the islanding must be detected by the DG units. In this condition it is essential that one of the controllers should be switched to the voltage-frequency (VF) control mode. In islanding, the network loses it slack reference and this reference...

  16. Hydrocarbon control strategies for gasoline marketing operations

    Energy Technology Data Exchange (ETDEWEB)

    Norton, R.L.; Sakaida, R.R.; Yamada, M.M.

    1978-05-01

    This informational document provides basic and current descriptions of gasoline marketing operations and methods that are available to control hydrocarbon emissions from these operations. The three types of facilities that are described are terminals, bulk plants, and service stations. Operational and business trends are also discussed. The potential emissions from typical facilities, including transport trucks, are given. The operations which lead to emissions from these facilities include (1) gasoline storage, (2) gasoline loading at terminals and bulk plants, (3) gasoline delivery to bulk plants and service stations, and (4) the refueling of vehicles at service stations. Available and possible methods for controlling emissions are described with their estimated control efficiencies and costs. This report also includes a bibliography of references cited in the text, and supplementary sources of information.

  17. Arbitrating Control of Control and Display Units

    Science.gov (United States)

    Sugden, Paul C.

    2007-01-01

    The ARINC 739 Switch is a computer program that arbitrates control of two multi-function control and display units (MCDUs) between (1) a commercial flight-management computer (FMC) and (2) NASA software used in research on transport aircraft. (MCDUs are the primary interfaces between pilots and FMCs on many commercial aircraft.) This program was recently redesigned into a software library that can be embedded in research application programs. As part of the redesign, this software was combined with software for creating custom pages of information to be displayed on a CDU. This software commands independent switching of the left (pilot s) and right (copilot s) MCDUs. For example, a custom CDU page can control the left CDU while the FMC controls the right CDU. The software uses menu keys to switch control of the CDU between the FMC or a custom CDU page. The software provides an interface that enables custom CDU pages to insert keystrokes into the FMC s CDU input interface. This feature allows the custom CDU pages to manipulate the FMC as if it were a pilot.

  18. 46 CFR 161.002-10 - Automatic fire detecting system control unit.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Automatic fire detecting system control unit. 161.002-10...-10 Automatic fire detecting system control unit. (a) General. The fire detecting system control unit... and the battery to be charged. (h) Automatic fire detecting system, battery charging and control—(1...

  19. Chapter 9. Educational process. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Richards, Guy A.; Sprung, Charles L.; Christian, Michael D.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Leoniv, Yuval; Margalit, Gila; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; Kesecioglu, Jozef; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joynt, Gavin M.; Colvin, John; Loo, Shi; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Danis, Marion; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Sandrock, Christian; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Rhodes, Andrew; Sanderson, Frances; Taylor, Bruce

    2010-01-01

    To provide recommendations and standard operating procedures (SOPs) for intensive care unit (ICU) and hospital preparations for an influenza pandemic or mass disaster with focus on education of all stakeholders, specifically the emergency executive control groups, ICU staff and staff co-opted to

  20. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  1. A Control Approach and Supplementary Controllers for a Stand-Alone System with Predominance of Wind Generation

    Directory of Open Access Journals (Sweden)

    Tiago Lukasievicz

    2018-02-01

    Full Text Available This paper proposes a control approach and supplementary controllers for the operation of a hybrid stand-alone system composed of a wind generation unit and a conventional generation unit based on synchronous generator (CGU. The proposed controllers allow the islanded or isolated operation of small power systems with predominance of wind generation. As an advantage and a paradigm shift, the DC-link voltage of the wind unit is controlled by means of a conventional synchronous generator connected to the AC grid of the system. Two supplementary controllers, added to a diesel generator (DIG and to a DC dump load (DL, are proposed to control the DC-link voltage. The wind generation unit operates in V-f control mode and the DIG operates in PQ control mode, which allows the stand-alone system to operate either in wind-diesel (WD mode or in wind-only (WO mode. The strong influence of the wind turbine speed variations in the DC-link voltage is mitigated by a low-pass filter added to the speed control loop of the wind turbine. The proposed control approach does not require the use battery bank and ultra-capacitor to control the DC-link voltage in wind generation units based on fully rated converter.

  2. Study of connected system of automatic control of load and operation efficiency of a steam boiler with extremal controller on a simulation model

    Science.gov (United States)

    Sabanin, V. R.; Starostin, A. A.; Repin, A. I.; Popov, A. I.

    2017-02-01

    The problems of operation effectiveness increase of steam boilers are considered. To maintain the optimum fuel combustion modes, it is proposed to use an extremal controller (EC) determining the value of airflow rate, at which the boiler generating the desired amount of heat will consume a minimum amount of fuel. EC sets the determined value of airflow rate to airflow rate controller (ARC). The test results of numerical simulation dynamic nonlinear model of steam boiler with the connected system of automatic control of load and combustion efficiency using EC are presented. The model is created in the Simulink modeling package of MATLAB software and can be used to optimize the combustion modes. Based on the modeling results, the conclusion was drawn about the possibility in principle of simultaneously boiler load control and optimizing by EC the combustion modes when changing the fuel combustion heat and the boiler characteristics and its operating mode. It is shown that it is possible to automatically control the operation efficiency of steam boilers when using EC without applying the standard flue gas analyzers. The article considers the numerical simulation dynamic model of steam boiler with the schemes of control of fuel consumption and airflow rate, the steam pressure and EC; the purpose of using EC in the scheme with linear controllers and the requirements to the quality of its operation; the results of operation of boiler control schemes without EC with estimation of influence of roughness of thermal mode maps on the nature of static and dynamic connection of the control units of fuel consumption and airflow rate; the phase trajectories and the diagrams of transient processes occurring in the control scheme with EC with stepped changing the fuel quality and boiler characteristics; analysis of modeling results and prospects for using EC in the control schemes of boilers.

  3. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control... Transmitter Control Internal Transmitter Control Systems § 90.473 Operation of internal transmitter control systems through licensed fixed control points. An internal transmitter control system may be operated...

  4. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  5. 46 CFR 196.85-1 - Magazine operation and control.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Magazine operation and control. 196.85-1 Section 196.85... OPERATIONS Magazine Control § 196.85-1 Magazine operation and control. (a) Keys to magazine spaces and magazine chests shall be kept in the sole control or custody of the Master or one delegated qualified...

  6. Human error mode identification for NPP main control room operations using soft controls

    International Nuclear Information System (INIS)

    Lee, Seung Jun; Kim, Jaewhan; Jang, Seung-Cheol

    2011-01-01

    The operation environment of main control rooms (MCRs) in modern nuclear power plants (NPPs) has considerably changed over the years. Advanced MCRs, which have been designed by adapting digital and computer technologies, have simpler interfaces using large display panels, computerized displays, soft controls, computerized procedure systems, and so on. The actions for the NPP operations are performed using soft controls in advanced MCRs. Soft controls have different features from conventional controls. Operators need to navigate the screens to find indicators and controls and manipulate controls using a mouse, touch screens, and so on. Due to these different interfaces, different human errors should be considered in the human reliability analysis (HRA) for advanced MCRs. In this work, human errors that could occur during operation executions using soft controls were analyzed. This work classified the human errors in soft controls into six types, and the reasons that affect the occurrence of the human errors were also analyzed. (author)

  7. 42 CFR 455.21 - Cooperation with State Medicaid fraud control units.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Cooperation with State Medicaid fraud control units... Detection and Investigation Program § 455.21 Cooperation with State Medicaid fraud control units. In a State with a Medicaid fraud control unit established and certified under subpart C of this part, (a) The...

  8. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  9. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  10. A programmable electronic Microplex Driver Unit for readout of silicon strip detectors

    International Nuclear Information System (INIS)

    Bairstow, R.

    1990-08-01

    The unit provides the necessary signals to drive arrays of Microplex devices used to readout silicon strip Vertex detectors as used in DELPHI and OPAL at CERN. The unit has a CAMAC interface allowing operation of the unit by computer in a Remote-control mode. The computer can control all the essential parameters of the drive signals, together with the operational characteristics of the system. Alternatively, the unit can be used in a stand-alone Local-control mode. In this case the front panel controls and displays enable the user to set up the unit. (author)

  11. Coordinated Control Scheme of Battery Energy Storage System (BESS) and Distributed Generations (DGs) for Electric Distribution Grid Operation

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Zhao, Haoran; Wu, Qiuwei

    2012-01-01

    into the islanding operation mode, while the centralized joint load frequency control (CJLFC) utilizing DGs handles the secondary frequency regulation. The BESS with the associated controllers has been modelled in Real-time digital simulator (RTDS) in order to identify the improvement of the frequency and voltage......This paper describes a coordinated control scheme of battery energy storage system (BESS) and distributed generations (DGs) for electric distribution grid operation. The BESS is designed to stabilize frequency and voltages as a primary control after the electric distribution system enters...... response. The modified IEEE 9-bus system, which is comprised of several DG units, wind power plant and the BESS, has been employed to illustrate the performance of the proposed coordinated flexible control scheme using RTDS in order to verify its practical efficacy....

  12. An operating environment for control systems on transputer networks

    NARCIS (Netherlands)

    Tillema, H.G.; Schoute, Albert L.; Wijbrans, K.C.J.; Wijbrans, K.C.J.

    1991-01-01

    The article describes an operating environment for control systems. The environment contains the basic layers of a distributed operating system. The design of this operating environment is based on the requirements demanded by controllers which can be found in complex control systems. Due to the

  13. 21 CFR 111.110 - What quality control operations are required for laboratory operations associated with the...

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for laboratory operations associated with the production and process control system? 111.110 Section 111.110 Food... § 111.110 What quality control operations are required for laboratory operations associated with the...

  14. What makes a control system usable? An operational viewpoint

    International Nuclear Information System (INIS)

    Clay, M.

    1990-01-01

    This report discusses the generally accepted successes and shortcomings of the various computer and hardware-based control systems at the Los Alamos Meson Physics Facility (LAMPF) from an operator's standpoint. LAMPF currently utilizes three separate control rooms that, although critically co-dependent, use distinct operating methods. The first, the Injector Control Room, which is responsible for the operation of the three ion sources, the 750 keV transport lines and the 201.25 MHz portion of the linac, uses a predominantly hardware-based control system. The second, the LANSCE Control Room, which is responsible for the operation of the Los Alamos Neutron Scattering Center, uses a graphical touch-panel interface with single-application screens as its control system. The third, the LAMPF Central Control Room, which is responsible for the overall operation of LAMPF, primarily uses a text-oriented keyboard interface with multiple applications per screen. Though each system provides generally reliable human interfacing to the enormously complex and diverse machine known as LAMPF, the operational requirements of speed, usability, and reliability are increasingly necessitating the use of a standard control system that incorporates the positive aspects of all three control systems. (orig.)

  15. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  16. Developing control room operator selection procedures

    International Nuclear Information System (INIS)

    Bosshardt, M.J.; Bownas, D.A.

    1979-01-01

    PDRI is performing a two-year study to identify the tasks performed and attributes required in electric power generating plant operating jobs, and focusing on the control room operator position. Approximately 65 investor-owned utilities are participating in the study

  17. Power supply control units for APS ring magnets

    International Nuclear Information System (INIS)

    Despe, O.D.

    1990-01-01

    The APS storage ring (1104 meters) is divided into 40 sectors. Each sector has 38 magnet coils in five magnet bases. Every alternate sector has an additional quadrupole magnet for skew correction. AR the main dipole magnets, two in each sector are connected in series and fed from one power supply unit. A base is controlled by one power supply control unit (PSCU). Each PSCU is connected to the host computer via a local area network (LAN). This note discusses the hardware configuration of the typical power supply control system used by the APS magnets and the software commands supported by the PSCU

  18. Design of BLDCM emulator for transmission control units

    Science.gov (United States)

    Liu, Chang; He, Yongyi; Zhang, Bodong

    2018-04-01

    According to the testing requirements of the transmission control unit, a brushless DC motor emulating system is designed based on motor simulation and power hardware-in-the-loop. The discrete motor model is established and a real-time numerical method is designed to solve the motor states. The motor emulator directly interacts with power stage of the transmission control unit using a power-efficient circuit topology and is compatible with sensor-less control. Experiments on a laboratory prototype help to verify that the system can emulate the real motor currents and voltages whenever the motor is starting up or suddenly loaded.

  19. Method for evaluating operator inputs to digital controllers

    International Nuclear Information System (INIS)

    Venhuizen, J.R.

    1983-01-01

    Most industrial processes employ operator-interactive control systems. The performance of these control systems is influenced by the choice of control station (device through which operator enters control commands). While the importance of proper control-station selection is widely accepted, standard and simple selection methods are not available for the control station using color-graphics terminals. This paper describes a unique facility for evaluating the effectiveness of various control stations. In the facility, a process is simulated on a hybrid computer, color-graphics display terminals provide information to the operator, and different control stations accept input commands to control the simulation. Tests are being conducted to evaluate a keyboard, a graphics tablet, and a CRT touch panel for use as control stations on a nuclear power plant. Preliminary results indicate that our facility can be used to determine those situations where each type of station is advantageous

  20. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  1. An advanced control system for the optimal operation and management of medium size power systems with a large penetration from renewable power sources

    Energy Technology Data Exchange (ETDEWEB)

    Nogaret, E.; Stavrakakis, G.; Kariniotakis, G. [Ecole de Mines de Paris, Centre d`Energetique, Sophia-Antipolis (France)] [and others

    1997-10-01

    An advanced control system for the optimal operation and management of autonomous wind-diesel systems is presented. This system minimises the production costs through an on-line optimal scheduling of the power units, which takes into account the technical constraints of the diesel units, as well as short-term forecasts of the load and renewable resources. The power system security is maximised through on-line security assessment modules, which enable the power system to withstand sudden changes in the production of the renewable sources. The control system was evaluated using data from the island of Lemnos, where it has been installed and operated since January 1995. (Author)

  2. DRIRU I/SKIRU - The application of the DTG to spacecraft attitude control. [Dynamically-Tuned Gyro for Inertial Reference Unit systems

    Science.gov (United States)

    Swanson, C. O.

    1982-01-01

    The dynamically tuned gyro (DTG) was developed to replace the floated, rate integrating gyro used for space attitude control, as the DTG fulfills cost, performance, and reliability requirements not satisfied by its predecessor. The use of this gyro in the Dry Gyro Inertial Reference Unit I (DRIRU I) marked the first application of a DTG in a spacecraft attitude reference unit. Design and performance characteristics of DTG application in the Singer-Kearfott Inertial Reference Unit (SKIRU) are outlined, for example its minimal weight (7 lb), and operational reliability. The DTG has accomplished 156,000 failure-free hours, and a chart, logging test performance, indicates that this and other requirements were more than sufficiently satisfied. The unit has an unparalleled life span, with several units still operating after 70,000 to 130,000 hours, and a random drift which always remains under 0.0005 deg/h. Potential for improvements, such as drift performance, are considered.

  3. Charge-Control Unit for Testing Lithium-Ion Cells

    Science.gov (United States)

    Reid, Concha M.; Mazo, Michelle A.; Button, Robert M.

    2008-01-01

    A charge-control unit was developed as part of a program to validate Li-ion cells packaged together in batteries for aerospace use. The lithium-ion cell charge-control unit will be useful to anyone who performs testing of battery cells for aerospace and non-aerospace uses and to anyone who manufacturers battery test equipment. This technology reduces the quantity of costly power supplies and independent channels that are needed for test programs in which multiple cells are tested. Battery test equipment manufacturers can integrate the technology into their battery test equipment as a method to manage charging of multiple cells in series. The unit manages a complex scheme that is required for charging Li-ion cells electrically connected in series. The unit makes it possible to evaluate cells together as a pack using a single primary test channel, while also making it possible to charge each cell individually. Hence, inherent cell-to-cell variations in a series string of cells can be addressed, and yet the cost of testing is reduced substantially below the cost of testing each cell as a separate entity. The unit consists of electronic circuits and thermal-management devices housed in a common package. It also includes isolated annunciators to signal when the cells are being actively bypassed. These annunciators can be used by external charge managers or can be connected in series to signal that all cells have reached maximum charge. The charge-control circuitry for each cell amounts to regulator circuitry and is powered by that cell, eliminating the need for an external power source or controller. A 110-VAC source of electricity is required to power the thermal-management portion of the unit. A small direct-current source can be used to supply power for an annunciator signal, if desired.

  4. Thermal-Hydraulic Analysis Tasks for ANAV NPPs in Support of Plant Operation and Control

    Directory of Open Access Journals (Sweden)

    L. Batet

    2007-11-01

    Full Text Available Thermal-hydraulic analysis tasks aimed at supporting plant operation and control of nuclear power plants are an important issue for the Asociación Nuclear Ascó-Vandellòs (ANAV. ANAV is the consortium that runs the Ascó power plants (2 units and the Vandellòs-II power plant. The reactors are Westinghouse-design, 3-loop PWRs with an approximate electrical power of 1000 MW. The Technical University of Catalonia (UPC thermal-hydraulic analysis team has jointly worked together with ANAV engineers at different levels in the analysis and improvement of these reactors. This article is an illustration of the usefulness of computational analysis for operational support. The contents presented were operational between 1985 and 2001 and subsequently changed slightly following various organizational adjustments. The paper has two different parts. In the first part, it describes the specific aspects of thermal-hydraulic analysis tasks related to operation and control and, in the second part, it briefly presents the results of three examples of analyses that were performed. All the presented examples are related to actual situations in which the scenarios were studied by analysts using thermal-hydraulic codes and prepared nodalizations. The paper also includes a qualitative evaluation of the benefits obtained by ANAV through thermal-hydraulic analyses aimed at supporting operation and plant control.

  5. Modernization project of the rod control system and in-core instrumentation system for 34 units of the 900 MW French EDF fleet

    International Nuclear Information System (INIS)

    Tavolara, Ivan; Desgeorge, Romain; Verburgh, Pierre

    2014-01-01

    Rolls-Royce and Cegelec, in partnership, carry out a unique and considerable modernisation project of two Instrumentation and Control (I and C) systems for the entire 900 MWe fleet of Electricite De France (EDF). Both rod control (RCS) and reactor in-core measurement (RIC) systems are to be modernised in the frame of the third ten-year renovation of all 34 reactor units over 9 power plants. The RCS contributes to the control of nuclear power by actuating control rod drive mechanisms that allow insertion or withdrawal of control rods. The RCS has also monitoring functions such as controlling the actual rods' position as well as the functional consistency between commands and actual positions. The RIC system measures in-core neutron flux, providing useful information to the control room as well as to the reactor unit computer for further processing. The renovated systems shall replace the existing ageing analog technology by modern digital technology based on PLC (Programmable Logic Controllers) and FPGA (Field-Programmable Gate Array) in the case of power subassemblies of RCS. Both systems rely for certain functions on a common network linking the RCS and RIC networks, improving operations and maintenance thanks to a powerful Man Machine Interface at the different locations of the systems with an extensive suite of tools and diagnostic menus. The project whose design phase started in July 2006 is now in its deployment phase after the successful site implementation of both systems at the first of kind units of Tricastin and Fessenheim power plants, respectively in August 2009 and February 2010. With 20 units in operation in 2014, the deployment shall continue with the other 14 until 2020. Rolls-Royce has a broad range of civil nuclear expertise, including work related to licensing and safety reviews, engineering design, supply chain management, manufacturing, installation and commissioning of the nuclear island systems and equipment, as well as operational

  6. IT Strategic and Operational Controls

    CERN Document Server

    Kyriazoglou, J

    2010-01-01

    This book provides a comprehensive guide to implementing an integrated and flexible set of IT controls in a systematic way. It can help organisations to formulate a complete culture for all areas which must be supervised and controlled; allowing them to simultaneously ensure a secure, high standard whilst striving to obtain the strategic and operational goals of the company.

  7. Operating control techniques for maglev transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Kraft, K H; Schnieder, E

    1984-06-01

    The technical and operational possibilities of magnetic levitation transport systems can only be fully exploited by introducing 'intelligent' control systems which ensure automatic and trouble-free train running. The solution of exacting requirements in the fields of traction dynamics, security and control as well as information gathering transmission and processing is an important prior condition in that respect. The authors report here on the present state of research and development in operating control techniques applicable to maglev transport systems.

  8. 14 CFR 91.1013 - Operational control briefing and acknowledgment.

    Science.gov (United States)

    2010-01-01

    ... Ownership Operations Operational Control § 91.1013 Operational control briefing and acknowledgment. (a) Upon...) Liability risk in the event of a flight-related occurrence that causes personal injury or property damage...

  9. Operation time extension for power units of the first generation NPP and the liability for potential damage

    International Nuclear Information System (INIS)

    Kovalevich, O.M.

    2000-01-01

    The problem on the operation time extension for the six operating NPP first generation power units is discussed. However it is not advisable to improve the safety of these power units up to the acceptable level, therefore there arises the contradiction between the operation time extension of these power units and potential damage for the population. The possibility of having the increased civilian-legal responsibility for potential harm and losses in case of an accident is proposed to be considered as a compensating measure. The measures for realization of this civilian-legal responsibility are described [ru

  10. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  11. Operating of mobile machine units system using the model of multicomponent complex movement

    OpenAIRE

    A. Lebedev; R. Kaidalov; N. Artiomov; M. Shulyak; M. Podrigalo; D. Abramov; D. Klets

    2015-01-01

    To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite) movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  12. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  13. Estimation of the optimal operating conditions for a radiation chemical neutralization unit

    International Nuclear Information System (INIS)

    Putilov, A.V.; Kamenetskaya, S.A.; Pshezhetskii, S.Ya.; Kazakov, M.S.; Kudryavtsev, S.L.; Petrukhin, N.V.; Misharin, B.A.; Koneev, V.Z.

    1985-01-01

    An estimate is made of the effect of the hydrodynamic conditions on the efficiency of foam units for the radiation chemical neutralization of impurities, taking into account the penetrating power of accelerated electrons having various energies. Expressions are obtained for calculating the efficiency of such units with sectionized operation of the chamber and taking account of the effect of incomplete mixing of the products of radiolysis through the height of the foam layer

  14. Control unit of a nuclear reactor

    International Nuclear Information System (INIS)

    Desfontaines, Guy; Le Helloco, Michel.

    1981-01-01

    Control unit comprising multiple leak-tight vessels, in communication with the inside of the reactor vessel, extending this vessel above its cover, in the vertical direction and each one enclosing a mechanism for moving a cluster of material absorbing the neutrons in the reactor core, actuated by a motor. This control unit is of reduced height above the vessel cover and provides efficient protection of the leak tight containments and the mechanisms in the event of earthquakes, easy removal and refitting of the vessel cover, good ventilation of the power devices of the mechanisms without the use of a complex ventilation system, efficient thermal insulation of the leak-tight containments assembly, as well as easy access to the motors and mechanism located in the leak-tight containment for carrying out any maintenance and repairs that might be required [fr

  15. The possibilities of municipal operations to control greenhouse gas emissions of road traffic

    Energy Technology Data Exchange (ETDEWEB)

    Saeily, S.

    2004-07-01

    Kyoto protocol obligates industrialized countries to decrease their greenhouse gas emissions averagely by 5,2 percent from the 1990 level before 2008-2012. Finland is committed to stabilize its greenhouse gas emissions to the level of year 1990 before 2008-2012. Carbon monoxide, hydrocarbon, nitric oxide, sulphur dioxide, particles and carbon dioxide are regarded as hazardous emissions of road traffic. These gases are generated by impure burning which is generally expected. From these gases carbon dioxide is considered to be the actual greenhouse gas. Nitric oxide, vaporizing hydrocarbons, sulphur dioxide and carbon monoxide are considered to be indirect greenhouse gases. 20 percent of Finland's carbon dioxide emissions comes from road traffic. Actions aimed to decrease greenhouse gas emissions can be executed at various levels. The smaller the size of an actor is, the more specific the possible actions are. The actions of public administration are based on controlling economy, traffic systems and maintenance of order. The actions of private companies and communities are based on economical profitability. Decisions of individual persons are still the most significant factor in decreasing green house gases generated by passenger traffic. In this study an operations model was developed for municipalities to reduce their greenhouse gas emissions. As a case city of the study was the city of Tampere. Tampere is the third largest city in Finland and has over 15,000 employees. A more specific set of measures was introduced to three different operational units, the University Hospital of Tampere, the primary school of Tammela and the amusement park Saerkaenniemi. For each unit suitable measures were searched by studying the unit's traffic-related significance to help to decrease the unit's greenhouse gas emissions. The traffic generated by municipal operations is mainly related to commuting, work-related, customer and maintenance traffic. Measures which are

  16. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  17. Standard formatted data units-control authority procedures

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to establish a set of minimum and optional requirements for the implementation of Control Authority (CA) organizations within and among the Agencies participating in the Consultative Committee for Space Data Systems (CCSDS). By satisfying these requirements, the resultant cooperating set of CA organizations will produce a global CA service supporting information transfer with digital data under the Standard Formatted Data Unit (SFDU) concept. This service is primarily accomplished through the registration, permanent archiving, and dissemination of metadata in the form of Metadata Objects (MDO) that assist in the interpretation of data objects received in SFDU form. This Recommendation addresses the responsibilities, services, and interface protocols for a hierarchy of CA organizations. The top level, consisting of the CCSDS Secretariat and its operational agent, is unique and primarily provides a global coordination function. The lower levels are Agency CA organizations that have primary responsibility for the registration, archiving, and dissemination of MDOs. As experience is gained and technology evolves, the CA Procedures will be extended to include enhanced services and their supporting protocols. In particular, it is anticipated that eventually CA organizations will be linked via networks on a global basis, and will provide requestors with online automated access to CA services. While this Recommendation does not preclude such operations, it also does not recommend the specific protocols to be used to ensure global compatibility of these services. These recommendations will be generated as experience is gained.

  18. Computer control for remote wind turbine operation

    Energy Technology Data Exchange (ETDEWEB)

    Manwell, J.F.; Rogers, A.L.; Abdulwahid, U.; Driscoll, J. [Univ. of Massachusetts, Amherst, MA (United States)

    1997-12-31

    Light weight wind turbines located in harsh, remote sites require particularly capable controllers. Based on extensive operation of the original ESI-807 moved to such a location, a much more sophisticated controller than the original one has been developed. This paper describes the design, development and testing of that new controller. The complete control and monitoring system consists of sensor and control inputs, the control computer, control outputs, and additional equipment. The control code was written in Microsoft Visual Basic on a PC type computer. The control code monitors potential faults and allows the turbine to operate in one of eight states: off, start, run, freewheel, low wind shut down, normal wind shutdown, emergency shutdown, and blade parking. The controller also incorporates two {open_quotes}virtual wind turbines,{close_quotes} including a dynamic model of the machine, for code testing. The controller can handle numerous situations for which the original controller was unequipped.

  19. OPERATING OF MOBILE MACHINE UNITS SYSTEM USING THE MODEL OF MULTICOMPONENT COMPLEX MOVEMENT

    Directory of Open Access Journals (Sweden)

    A. Lebedev

    2015-07-01

    Full Text Available To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  20. Operational experience with the CEBAF control system

    International Nuclear Information System (INIS)

    Hovater, C.; Chowdhary, M.; Karn, J.; Tiefenback, M.; Zeijts, J. van; Watson, W.

    1996-01-01

    The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics

  1. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  2. Design and implementation of co-operative control strategy for hybrid AC/DC microgrids

    Science.gov (United States)

    Mahmud, Rasel

    This thesis is mainly divided in two major sections: 1) Modeling and control of AC microgrid, DC microgrid, Hybrid AC/DC microgrid using distributed co-operative control, and 2) Development of a four bus laboratory prototype of an AC microgrid system. At first, a distributed cooperative control (DCC) for a DC microgrid considering the state-of-charge (SoC) of the batteries in a typical plug-in-electric-vehicle (PEV) is developed. In DC microgrids, this methodology is developed to assist the load sharing amongst the distributed generation units (DGs), according to their ratings with improved voltage regulation. Subsequently, a DCC based control algorithm for AC microgrid is also investigated to improve the performance of AC microgrid in terms of power sharing among the DGs, voltage regulation and frequency deviation. The results validate the advantages of the proposed methodology as compared to traditional droop control of AC microgrid. The DCC-based control methodology for AC microgrid and DC microgrid are further expanded to develop a DCC-based power management algorithm for hybrid AC/DC microgrid. The developed algorithm for hybrid microgrid controls the power flow through the interfacing converter (IC) between the AC and DC microgrids. This will facilitate the power sharing between the DGs according to their power ratings. Moreover, it enables the fixed scheduled power delivery at different operating conditions, while maintaining good voltage regulation and improved frequency profile. The second section provides a detailed explanation and step-by-step design and development of an AC/DC microgrid testbed. Controllers for the three-phase inverters are designed and tested on different generation units along with their corresponding inductor-capacitor-inductor (LCL) filters to eliminate the switching frequency harmonics. Electric power distribution line models are developed to form the microgrid network topology. Voltage and current sensors are placed in the proper

  3. Feasibility Study for Operable Unit 7-13/14

    International Nuclear Information System (INIS)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-01-01

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  4. Feasibility Study for Operable Unit 7-13/14

    Energy Technology Data Exchange (ETDEWEB)

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  5. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60 Co, 90 Sr, and 137 Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  6. Evaluation of awareness concerning fire prevention and control methods among personnel of operating room in a hospital

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available Introduction: There are risk of fire accidents in Operating rooms during surgery. Experts estimate annually around 100 fire accidents occur in the operating rooms of United States’s hospitals. 10 to 20 of these accidents lead to severe injuries and about 1 to 2 lead to death. Despite such accidents rarely happen, but they can lead to serious injury or death of patients. .Material and Method: This Cross-sectional questionnaire based survey was conducted among several hospitals belonged to Shiraz University of Medical Sciences. In this study, all personnel of operating rooms were investigated. Questionnaire were used to collect information and the chi-square test was applied to examine the relationship between the Knowledge of operating room personels on fire prevention and control methods, jobs and work experience. For statistical analysis SPSS14 were used. .Result: In this study from 220 participants, about 19.72% had full awareness, 19.62% had partial knowledge, 19.37% had low awareness and 40.97% had no knowledge on fire prevention methods, concerning fire control methods. However, 76% of the participate had full awareness and 24% had no knowledge. Test result Statistically showed that the relationship between the awareness of operating room personnel to fire control methods and work experience were significant (P-value <0.05. But, the relationship between the knowledge of operating room to fire control methods and the type of jobs were not significant. Also no significant relationship were found between the level of awareness in operating room personnel to fire prevention methods, work experience and job title. .Conclusion: The results indicated that the operating room staff awareness of fire prevention and control methods are low. The results also showed that awareness of fires prevention are lower than the awareness of fire control among the studied personel. Regarding to the potential risk of fire in the operating room, it is suggested

  7. Unit operation in food manufacturing and processing. Shokuhin seizo/kako ni okeru tan'i sosa

    Energy Technology Data Exchange (ETDEWEB)

    Matsuno, R. (Kyoto Univ., Kyoto (Japan). Faculty of Aguriculture)

    1993-09-05

    Processed foods must be produced in mass, cheap and safe and should be suitable for the delicate taste of human being. Food tastes are effected by an outlook on human attitude, and the surrounding environment. And these factors are reflected to unit operation in food manufacturing and processing and it is clarified that there are many technical difficulties. The characteristics of unit operation for food manufacturing and processing are that the food materials are a multicomponent system, moreover, a very small amount of aroma components, taste components, vitamin, physiologically activation materials and so on are more important than the main components, and also inapplicable of the model centering to the most quantitative component. The purpose of unit operation in food manufacturing and processing is to produce the properties of matter matching to human sense, and therefore there are many problems left unsolved. The development of analytical technology also has an influence on manufacturing and processing technology. Consequently, food manufacturing and processing technology must be based on general science. It is necessary to develop unit operation with an understanding of mutual effect between food and human body.

  8. Operator approach to linear control systems

    CERN Document Server

    Cheremensky, A

    1996-01-01

    Within the framework of the optimization problem for linear control systems with quadratic performance index (LQP), the operator approach allows the construction of a systems theory including a number of particular infinite-dimensional optimization problems with hardly visible concreteness. This approach yields interesting interpretations of these problems and more effective feedback design methods. This book is unique in its emphasis on developing methods for solving a sufficiently general LQP. Although this is complex material, the theory developed here is built on transparent and relatively simple principles, and readers with less experience in the field of operator theory will find enough material to give them a good overview of the current state of LQP theory and its applications. Audience: Graduate students and researchers in the fields of mathematical systems theory, operator theory, cybernetics, and control systems.

  9. Automatic Power Control for Daily Load-following Operation using Model Predictive Control Method

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Keuk Jong; Kim, Han Gon [KH, Daejeon (Korea, Republic of)

    2009-10-15

    Under the circumstances that nuclear power occupies more than 50%, nuclear power plants are required to be operated on load-following operation in order to make the effective management of electric grid system and enhanced responsiveness to rapid changes in power demand. Conventional reactors such as the OPR1000 and APR1400 have a regulating system that controls the average temperature of the reactor core relation to the reference temperature. This conventional method has the advantages of proven technology and ease of implementation. However, this method is unsuitable for controlling the axial power shape, particularly the load following operation. Accordingly, this paper reports on the development of a model predictive control method which is able to control the reactor power and the axial shape index. The purpose of this study is to analyze the behavior of nuclear reactor power and the axial power shape by using a model predictive control method when the power is increased and decreased for a daily load following operation. The study confirms that deviations in the axial shape index (ASI) are within the operating limit.

  10. General predictive control using the delta operator

    DEFF Research Database (Denmark)

    Jensen, Morten Rostgaard; Poulsen, Niels Kjølstad; Ravn, Ole

    1993-01-01

    This paper deals with two-discrete-time operators, the conventional forward shift-operator and the δ-operator. Both operators are treated in view of construction of suitable solutions to the Diophantine equation for the purpose of prediction. A general step-recursive scheme is presented. Finally...... a general predictive control (GPC) is formulated and applied adaptively to a continuous-time plant...

  11. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC)

    OpenAIRE

    Mohammad Javad Abdollahi; Majid Moazzami

    2015-01-01

    In this paper security constraints unit commitment (SCUC) in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested...

  12. Marcoule pilot work-room: process automatic operation

    International Nuclear Information System (INIS)

    Mus, G.; Linger, C.

    1987-01-01

    Commissioned in the early 1960s, the Marcoule Pilot Plant has undergone a series of sweeping transformations. The Research and Development resources concerning irradiated fuel processing have been expanded and modified. Its reprocessing capacity has also been raised from 2 to 5 t/year. Simultaneously, the installation control system was completely remodelled. The control consoles, which were previously positioned locally near the different units, have been grouped together in a centralized control room. To do this, the measurement and operating circuits were replaced by new data acquisition and processing systems requiring the use of numerical algorithms. The management and control of certain units, including mechanical fuel preparation, sampling, and sample transport to the laboratories, have been entrusted to programmable automata. Certain unit operations, such as concentration by evaporation, are set up with complete automation. These new arrangements will expand the resources for analysing the operation of the Pilot Plant, while offering a more overall view of the operations. They have been made possible by a major effort in the development of sensors, and represent the indispensable prerequisite for the installation of expert systems [fr

  13. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  14. Adaptive control system having hedge unit and related apparatus and methods

    Science.gov (United States)

    Johnson, Eric Norman (Inventor); Calise, Anthony J. (Inventor)

    2007-01-01

    The invention includes an adaptive control system used to control a plant. The adaptive control system includes a hedge unit that receives at least one control signal and a plant state signal. The hedge unit generates a hedge signal based on the control signal, the plant state signal, and a hedge model including a first model having one or more characteristics to which the adaptive control system is not to adapt, and a second model not having the characteristic(s) to which the adaptive control system is not to adapt. The hedge signal is used in the adaptive control system to remove the effect of the characteristic from a signal supplied to an adaptation law unit of the adaptive control system so that the adaptive control system does not adapt to the characteristic in controlling the plant.

  15. Plant status control - with an operational focus

    International Nuclear Information System (INIS)

    Lane, L.A.

    2000-01-01

    In the Nuclear industry, we have done a very good job of designing, developing, constructing, and improving our nuclear facilities. We have, however, often been inconsistent in documenting the details of our facilities, clearly addressing the rules around facility operation, and controlling and tracking the temporary, or permanent changes to our facilities. The reality is, that once we build a facility, we then must operate the facility, for it to be viable. Further we must operate it safely and efficiently for the facility to produce its product, and be acceptable to the public. Unfortunately, when we design and build these large, complicated facilities, we cannot project all the nuances of facility operation, although we can recognize this potential gap, and prepare for it. In order to allow for the complexities of the real world, we must provide the individuals who are tasked with operating our nuclear facilities, with the tools and processes to deal with 'all the nuances' of facility operation. This discussion will focus on the concepts behind a key process for ensuring that we meet our design and operating needs for our facilities, as well as recognizing and dealing with the potential gaps. The key process is 'Plant Status Control', and the discussion will have a primary focus on the needs of the end users, that being the individuals that have the immediate and current accountability for control and safety of the facility, the equipment, the staff, and ultimately the public, that being our Operations staff, and the Shift Manager. (author)

  16. Detailed design and first tests of the application software for the instrument control unit of Euclid-NISP

    Science.gov (United States)

    Ligori, S.; Corcione, L.; Capobianco, V.; Bonino, D.; Sirri, G.; Fornari, F.; Giacomini, F.; Patrizii, L.; Valenziano, L.; Travaglini, R.; Colodro, C.; Bortoletto, F.; Bonoli, C.; Chiarusi, T.; Margiotta, A.; Mauri, N.; Pasqualini, L.; Spurio, M.; Tenti, M.; Dal Corso, F.; Dusini, S.; Laudisio, F.; Sirignano, C.; Stanco, L.; Ventura, S.; Auricchio, N.; Balestra, A.; Franceschi, E.; Morgante, G.; Trifoglio, M.; Medinaceli, E.; Guizzo, G. P.; Debei, S.; Stephen, J. B.

    2016-07-01

    In this paper we describe the detailed design of the application software (ASW) of the instrument control unit (ICU) of NISP, the Near-Infrared Spectro-Photometer of the Euclid mission. This software is based on a real-time operating system (RTEMS) and will interface with all the subunits of NISP, as well as the command and data management unit (CDMU) of the spacecraft for telecommand and housekeeping management. We briefly review the main requirements driving the design and the architecture of the software that is approaching the Critical Design Review level. The interaction with the data processing unit (DPU), which is the intelligent subunit controlling the detector system, is described in detail, as well as the concept for the implementation of the failure detection, isolation and recovery (FDIR) algorithms. The first version of the software is under development on a Breadboard model produced by AIRBUS/CRISA. We describe the results of the tests and the main performances and budgets.

  17. INEL Operable Unit 7-13 containment and stabilization configuration option

    International Nuclear Information System (INIS)

    Raivo, B.D.; Richardson, J.G.; Nickelson, D.F.

    1993-05-01

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory's Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option

  18. Microgravity induced changes in the control of motor units

    Science.gov (United States)

    de Luca, C.; Roy, S.

    The goal of this project is to understand the effects of microgravity on the control of muscles. It is motivated by the notion that in order to adequately address microgravity-induced deterioration in the force generating capacity of muscles, one needs to understand the changes in the control aspects in addition to histochemical and morphological changes. The investigations into muscle control need to include the regulation of the firing activity of motor units that make up a muscle and the coordination of different muscles responsible for the control of a joint. In order to understand the effects of microgravity on these two aspects of muscle control, we will test astronauts before and after spaceflight. The investigations of the control of motor units will involve intramuscular EMG techniques developed in our laboratory. We will use a quadrifilar electrode to detect simultaneously three differential channels of EMG activity. These data will be decomposed accurately using a sophisticated set of algorithms constructed with artificial intelligence knowledge- based techniques. Particular attention will be paid to the firing rate and recruitment behavior of motor units and we will study the degree of cross-correlation of the firing rates. This approach will enable us to study the firing behavior of several (approx. 10) concurrently active motor units. This analysis will enable us to detect modifications in the control of motor units. We will perform these investigations in a hand muscle, which continues being used in prehensile tasks in space, and a leg muscle whose antigravity role is not needed in space. The comparison of the effects of weightlessness on these muscles will determine if continued use of muscles in space deters the possible deleterious effects of microgravity on the control of motor units, in addition to slowing down atrophy. We are particularly interested in comparing the results of this study to similar data already obtained from elderly subjects

  19. Enhanced methods for operating refueling station tube-trailers to reduce refueling cost

    Science.gov (United States)

    Elgowainy, Amgad; Reddi, Krishna

    2017-08-22

    A method and apparatus are provided for operating a refueling station including source tube-trailers and at least one compressor to reduce refueling cost. The refueling station includes a gaseous fuel supply source including a plurality of tanks on a tube trailer coupled to a first control unit, and high pressure buffer storage having predefined capacity coupled to a second control unit and the first tanks by a pressure control valve and the first control unit, and at least one compressor. The refueling station is operated at different modes depending on a state of the refueling station at the beginning of each operational mode. The refueling system is assessed at the end of each operational mode to identify the state of the system and select a next mode of operation. The operational modes include consolidating hydrogen, or any gaseous fuel, within the tubes mounted on the trailer.

  20. The concept of information support system for operational personnel of operating NPPs

    International Nuclear Information System (INIS)

    Dunaev, V.G.; Golovanov, V.V.

    1993-01-01

    The paper has been prepared on the materials of the concept developed by the order of ''Rosenergoatom'' concern. In the present paper the main definitions, the principal objectives and functions of the operator support system (OSS) are stated, a brief analysis of operation features of some existing operator information systems is presented, the main trends of development of operator information support system are given, the way and the sequence for implementation of the systems for operating NPPs are reviewed. In this proposed concept in the first place are considered the information support systems for the operators of the power unit main control rooms, however, the presented principles may be applied while designing information support systems for operators of other control rooms of NPP. 4 refs

  1. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  2. Two aspects of the technical and ergonomical evaluation of the advanced control-room of the new French PWR units

    International Nuclear Information System (INIS)

    Montmayeul, R.; Lestien, A.; Dien, Y.; Bozec, J.

    1987-01-01

    In 1981 EDF decided to design a computerized control-room to improve operations. The first unit will be put on the grid in 1991. In order to get a rapid feed-back of operating experience from the design of the new control-room, a full scope simulator has been built for validation by operating teams in 1987-1988. An evaluation plan has been designed. The evaluation goal is to show operation feasibility under any condition and evaluate ergonomy of the control-room. Various aspects have been defined for evaluation: workstation ergonomy, man-machine dialogue and workstation management, work distribution within an operating team, visual and medical aspects, work place and physical environment of the control-room. For each aspect hypothesis have been set up and will be validated. Validation is based on record of operators'actions, observations of behaviour during simulations and interviews. Several series of simulations under normal, incidental and accidental situations are planned. One of the most specific aspects of the new control-room is the computerized man-machine dialogue which needs workstation management actions to get information and actuate controls. Hypothesis concerning this aspect of the validation have been set up from design documentation, before any observation of work was possible, and was based on knowledge of potential problems of this kind of interface in process-control. The validation method is comparative between various simulations, between operators, between a computerized control-room and a classical one. Another aspect concerns the tasks allocation between shifts members and work organization in the control-room. For this part of the evaluation, hypothesis and experimental protocoles were made on the basis of a detailed analysis of work conditions in the present control-rooms. These two aspects of the control-room evaluation are presented. (author)

  3. Reactor control system. PWR

    International Nuclear Information System (INIS)

    2009-01-01

    At present, 23 units of PWR type reactors have been operated in Japan since the start of Mihama Unit 1 operation in 1970 and various improvements have been made to upgrade operability of power stations as well as reliability and safety of power plants. As the share of nuclear power increases, further improvements of operating performance such as load following capability will be requested for power stations with more reliable and safer operation. This article outlined the reactor control system of PWR type reactors and described the control performance of power plants realized with those systems. The PWR control system is characterized that the turbine power is automatic or manually controlled with request of the electric power system and then the nuclear power is followingly controlled with the change of core reactivity. The system mainly consists of reactor automatic control system (control rod control system), pressurizer pressure control system, pressurizer water level control system, steam generator water level control system and turbine bypass control system. (T. Tanaka)

  4. Automatic Control of Freeboard and Turbine Operation

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter Bak; Friis-Madsen, Erik

    The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003.......The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003....

  5. SOSPO-SP: Secure Operation of Sustainable Power Systems Simulation Platform for Real-Time System State Evaluation and Control

    DEFF Research Database (Denmark)

    Morais, Hugo; Vancraeyveld, Pieter; Pedersen, Allan Henning Birger

    2014-01-01

    Measurement Units (PMUs) provides more information and enables wide-area monitoring with accurate timing. One of the challenges in the near future is converting the high quantity and quality of information provided by PMUs into useful knowledge about operational state of a global system. The use of real-time...... simulation in closed-loop is essential to develop and validate new real-time applications of wide-area PMU data. This paper presents a simulation platform developed within the research project Secure Operation of Sustainable Power Systems (SOSPO). The SOSPO simulation platform (SOSPO-SP) functions...... in a closed-loop, integrating new real-time assessment methods to provide useful information to operators in power system control centers and to develop new control methodologies that handle emergency situations and avoid power system blackouts....

  6. Design and operational parameters of transportable supercritical water oxidation waste destruction unit

    International Nuclear Information System (INIS)

    McFarland, R.D.; Brewer, G.R.; Rofer, C.K.

    1991-12-01

    Supercritical water oxidation (SCWO) is the destruction of hazardous waste by oxidation in the presence of water at temperatures and pressures above its critical point. A 1 gal/h SCWO waste destruction unit (WDU) has been designed, built, and operated at Los Alamos National Laboratory. This unit is transportable and is intended to demonstrate the SCWO technology on wastes at Department of Energy sites. This report describes the design of the WDU and the preliminary testing phase leading to demonstration

  7. The quality of operative notes at a general surgery unit.

    Science.gov (United States)

    Rogers, A; Bunting, M; Atherstone, A

    2008-09-01

    With the increasingly litigious nature of medical practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in a general surgery unit in order to improve our practice. An audit of 100 consecutive operative notes was performed, and notes were assessed using the Royal College of Surgeons guidelines. The quality of note-taking of trainees was compared with that of consultant surgeons. A series of operation note pro formas was designed in response to the findings. Of the notes, 66% were completed by trainees. The vast majority of notes had no diagram to demonstrate the surgical findings or illustrate the actions. Specialist surgeons were more likely to describe the actions accurately, but less likely to describe wound closure methods or dressings used. They were also less likely to complete adequate postoperative orders. This study identifies key areas of weakness in our operative note-keeping. Pro formas should be introduced and made available for commonly performed procedures, and diagrams should be used wherever possible.

  8. Implementation of an operator model with error mechanisms for nuclear power plant control room operation

    International Nuclear Information System (INIS)

    Suh, Sang Moon; Cheon, Se Woo; Lee, Yong Hee; Lee, Jung Woon; Park, Young Taek

    1996-01-01

    SACOM(Simulation Analyser with Cognitive Operator Model) is being developed at Korea Atomic Energy Research Institute to simulate human operator's cognitive characteristics during the emergency situations of nuclear power plans. An operator model with error mechanisms has been developed and combined into SACOM to simulate human operator's cognitive information process based on the Rasmussen's decision ladder model. The operational logic for five different cognitive activities (Agents), operator's attentional control (Controller), short-term memory (Blackboard), and long-term memory (Knowledge Base) have been developed and implemented on blackboard architecture. A trial simulation with a scenario for emergency operation has been performed to verify the operational logic. It was found that the operator model with error mechanisms is suitable for the simulation of operator's cognitive behavior in emergency situation

  9. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    Science.gov (United States)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  10. User Control Interface for W7-X Plasma Operation

    International Nuclear Information System (INIS)

    Spring, A.; Laqua, H.; Schacht, J.

    2006-01-01

    The WENDELSTEIN 7-X fusion experiment will be a highly complex device operated by a likewise complex control system. The fundamental configuration of the W7-X control system follows two major design principles: It reflects the strict hierarchy of the machine set-up with a set of subordinated components, which in turn can be run autonomously during commissioning and testing. Secondly, it links the basic machine operation (mainly given by the infrastructure status and the components readiness) and the physics program execution (i.e. plasma operation) on each hierarchy level and on different time scales. The complexity of the control system implies great demands on appropriate user interfaces: specialized tools for specific control tasks allowing a dedicated view on the subject to be controlled, hiding complexity wherever possible and reasonable, providing similar operation methods on each hierarchy level and both manual interaction possibilities and a high degree of intelligent automation. The contribution will describe the operation interface for experiment control including the necessary links to the machine operation. The users of ' Xcontrol ' will be both the W7-X session leaders during plasma discharge experiments and the components' or diagnostics' operators during autonomous mode or even laboratory experiments. The main ' Xcontrol ' features, such as program composition and validation, manual and automatic control instruments, resource survey, and process monitoring, will be presented. The implementation principles and the underlying communication will be discussed. (author)

  11. The Movement Control Battalions Role in Airfield Operations

    Science.gov (United States)

    2016-05-17

    November–December 2015 Army Sustainment44 The 53rd Transportation Bat-talion ( Movement Control) (MCB) arrived in Liberia in support of the...over Internet Pro- tocol. The MCT did not have these capabilities. During the deployment, the 53rd MCB consisted of the headquarters The Movement ...Control Battalion’s Role in Airfield Operations The 53rd Transportation Battalion ( Movement Control) assumed responsibility for airfield operations

  12. Emergency operating instruction improvements at San Onofre Nuclear Generating Station Units 2 and 3

    International Nuclear Information System (INIS)

    Trillo, M.W.; Smith, B.H.

    1989-01-01

    In late 1987, San Onofre nuclear generating station (SONGS) began an extensive upgrade of the units 2 and 3 emergency operating instructions (EOIs). The original intent of this program was to incorporate revised generic guidance and to correct problems that were identified by operators. While this program was in progress, the US Nuclear Regulatory Commission (NRC) conducted a series of audits of emergency operating procedure (EOP) development and maintenance programs as 16 commercial nuclear facilities in the United States. These audits included four stations with Combustion Engineering-designed nuclear steam supply systems. (One of these audits included a review of preupgrade SONGS units 2 and 3 EOIs.) Significant industrywide comments resulted from these audits. The NRC has stated its intent to continue the review and audit of EOIs and the associated maintenance programs at all US commercial nuclear facilities. The units 2 and 3 EOI upgrade program developed procedural improvements and procedural program maintenance improvements that address many of the existing audit comments that have been received by the industry. Other resulting improvements may be useful in minimizing NRC comments in future such audits. Specific improvements are discussed. The upgrade program resulted in benefits that were not originally anticipated. The results of this program can be of significant use by other utilities in addressing the industrywide concerns that have been raised in recent NRC audits of EOP development and maintenance programs

  13. Projection Operator: A Step Towards Certification of Adaptive Controllers

    Science.gov (United States)

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  14. Belt conveyor dynamics in transient operation for speed control

    OpenAIRE

    He, D.; Pang, Y.; Lodewijks, G.

    2016-01-01

    Belt conveyors play an important role in continuous dry bulk material transport, especially at the mining industry. Speed control is expected to reduce the energy consumption of belt conveyors. Transient operation is the operation of increasing or decreasing conveyor speed for speed control. According to literature review, current research rarely takes the conveyor dynamics in transient operation into account. However, in belt conveyor speed control, the conveyor dynamic behaviors are signifi...

  15. Testing of an End-Point Control Unit Designed to Enable Precision Control of Manipulator-Coupled Spacecraft

    Science.gov (United States)

    Montgomery, Raymond C.; Ghosh, Dave; Tobbe, Patrick A.; Weathers, John M.; Manouchehri, Davoud; Lindsay, Thomas S.

    1994-01-01

    This paper presents an end-point control concept designed to enable precision telerobotic control of manipulator-coupled spacecraft. The concept employs a hardware unit (end-point control unit EPCU) that is positioned between the end-effector of the Space Shuttle Remote Manipulator System and the payload. Features of the unit are active compliance (control of the displacement between the end-effector and the payload), to allow precision control of payload motions, and inertial load relief, to prevent the transmission of loads between the end-effector and the payload. This paper presents the concept and studies the active compliance feature using a simulation and hardware. Results of the simulation show the effectiveness of the EPCU in smoothing the motion of the payload. Results are presented from initial, limited tests of a laboratory hardware unit on a robotic arm testbed at the l Space Flight Center. Tracking performance of the arm in a constant speed automated retraction and extension maneuver of a heavy payload with and without the unit active is compared for the design speed and higher speeds. Simultaneous load reduction and tracking performance are demonstrated using the EPCU.

  16. Experience on operational safety improvement of control and operation support systems

    International Nuclear Information System (INIS)

    Itoh, N.; Nakagawa, T.; Mano, K.

    1988-01-01

    Japanese nuclear industry started in 1956 and about 30 years have passed since that time. Through these years, we have made a lot of efforts and developments in the field of Control and Instrumentation (C and I) system. The above 30 years and following years can be divided into four major periods. The first one is the period of research, the second of domestic production, the third of improvement, and the fourth of advancement. Improvements of C and I system, which we have made in those periods have made a great contribution to enhancement of reliability, availability and operability of nuclear power plants. Fig. 1 shows TEPCO's nuclear power plant (BWR) construction experience and technical trend of C and I system in Japan. This paper is to introduce the efforts and operational experience on control and operation support systems

  17. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  18. Towards more consistent and effective food control: learning from the views of food business operators.

    Science.gov (United States)

    Kettunen, Karoliina; Lundén, Janne; Läikkö-Roto, Tiina; Nevas, Mari

    2017-06-01

    We surveyed the opinions of Finnish food business operators (FBOs) about the uniformity of local official food control and its importance for dairy, fishery and meat plants. A total of 136 FBOs responded to the questionnaire. Most FBOs considered official food control to be important for food safety and were generally satisfied with its quality. However, they often did not perceive official food control as being uniform, and 23% even considered it arbitrary. Small-sized FBOs were particularly critical of the relevance of control actions. The better the FBOs assessed their cooperation with the inspector, the higher they assessed the quality, uniformity and benefits of official food control. The cooperative approach in control practices should be emphasized to support the positive views of FBOs about official food control, thus promoting food safety. Cross-audits among local food control units are recommended to improve the FBOs' experience of uniformity of food control.

  19. Operation safety of control systems. Principles and methods

    International Nuclear Information System (INIS)

    Aubry, J.F.; Chatelet, E.

    2008-01-01

    This article presents the main operation safety methods that can be implemented to design safe control systems taking into account the behaviour of the different components with each other (binary 'operation/failure' behaviours, non-consistent behaviours and 'hidden' failures, dynamical behaviours and temporal aspects etc). To take into account these different behaviours, advanced qualitative and quantitative methods have to be used which are described in this article: 1 - qualitative methods of analysis: functional analysis, preliminary risk analysis, failure mode and failure effects analyses; 2 - quantitative study of systems operation safety: binary representation models, state space-based methods, event space-based methods; 3 - application to the design of control systems: safe specifications of a control system, qualitative analysis of operation safety, quantitative analysis, example of application; 4 - conclusion. (J.S.)

  20. Adding control to arbitrary unknown quantum operations

    Science.gov (United States)

    Zhou, Xiao-Qi; Ralph, Timothy C.; Kalasuwan, Pruet; Zhang, Mian; Peruzzo, Alberto; Lanyon, Benjamin P.; O'Brien, Jeremy L.

    2011-01-01

    Although quantum computers promise significant advantages, the complexity of quantum algorithms remains a major technological obstacle. We have developed and demonstrated an architecture-independent technique that simplifies adding control qubits to arbitrary quantum operations—a requirement in many quantum algorithms, simulations and metrology. The technique, which is independent of how the operation is done, does not require knowledge of what the operation is, and largely separates the problems of how to implement a quantum operation in the laboratory and how to add a control. Here, we demonstrate an entanglement-based version in a photonic system, realizing a range of different two-qubit gates with high fidelity. PMID:21811242

  1. Article separation apparatus and method for unit operations

    Science.gov (United States)

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  2. Purpose and benefit of control system training for operators

    International Nuclear Information System (INIS)

    Zimoch, E.; Luedeke, A.

    2012-01-01

    The complexity of accelerators is ever increasing and today it is typical that a large number of feedback loops are implemented, based on sophisticated models which describe the underlying physics. Despite this increased complexity the machine operators must still effectively monitor and supervise the desired behavior of the accelerator. This is not alone sufficient; additionally, the correct operation of the control system must also be verified. This is not always easy since the structure, design, and performance of the control system is usually not visualized and is often hidden to the operator. To better deal with this situation operators need some knowledge of the control system in order to react properly in the case of problems. In fact operators need mental models of the control system to recognize fault states and react appropriate to errors and misbehavior of both, the accelerator and the control system itself. Mental models gained only on infrequent experience can be imprecise or plain wrong in worst case. Control system training can provide a foundation to build better mental models and therefore help to enhance operator responses and machine availability. For a refinement of the mental model repeated experience is needed. This can be provided by training sessions at the real accelerator

  3. Bidirectional control of a one-dimensional robotic actuator by operant conditioning of a single unit in rat motor cortex

    Directory of Open Access Journals (Sweden)

    Pierre-Jean eArduin

    2014-07-01

    Full Text Available The design of efficient neuroprosthetic devices has become a major challenge for the long-term goal of restoring autonomy to motor-impaired patients. One approach for brain control of actuators consists in decoding the activity pattern obtained by simultaneously recording large neuronal ensembles in order to predict in real-time the subject’s intention, and move the prosthesis accordingly. An alternative way is to assign the output of one or a few neurons by operant conditioning to control the prosthesis with rules defined by the experimenter, and rely on the functional adaptation of these neurons during learning to reach the desired behavioral outcome. Here, several motor cortex neurons were recorded simultaneously in head-fixed awake rats and were conditioned, one at a time, to modulate their firing rate up and down in order to control the speed and direction of a one-dimensional actuator carrying a water bottle. The goal was to maintain the bottle in front of the rat’s mouth, allowing it to drink. After learning, all conditioned neurons modulated their firing rate, effectively controlling the bottle position so that the drinking time was increased relative to chance. The mean firing rate averaged over all bottle trajectories depended non-linearly on position, so that the mouth position operated as an attractor. Some modifications of mean firing rate were observed in the surrounding neurons, but to a lesser extent. Notably, the conditioned neuron reacted faster and led to a better control than surrounding neurons, as calculated by using the activity of those neurons to generate simulated bottle trajectories. Our study demonstrates the feasibility, even in the rodent, of using a motor cortex neuron to control a prosthesis in real-time bidirectionally. The learning process includes modifications of the activity of neighboring cortical neurons, while the conditioned neuron selectively leads the activity patterns associated with the prosthesis

  4. Development of Protection and Control Unit for Distribution Substation

    Science.gov (United States)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  5. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  6. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  7. Joint Forward Operating Base Elements of Command and Control

    National Research Council Canada - National Science Library

    Summers, William

    2002-01-01

    ... and its associated leadership, command of air assets at a joint forward operating base lacks guidance. Today, the United States prosecutes an air war over Afghanistan from bases in Uzbekistan, Pakistan, and Afghanistan...

  8. Oxy-fired boiler unit and method of operating the same

    Science.gov (United States)

    Lou, Xinsheng; Zhang, Jundong; Joshi, Abhinaya; McCombe, James A.; Levasseur, Armand A.

    2016-12-06

    An oxy-combustion boiler unit is disclosed which includes a furnace for combusting fuel and for emitting flue gas resulting from combustion. The furnace has first, second and third combustion zones, and an air separation unit for separating oxygen gas from air and providing a first portion of the separated oxygen to a first oxidant flow, a second portion to a second oxidant flow, and a third portion of the separated oxygen gas to the first, second, and third zones of the furnace. A controller can cause the separated oxygen gas to be distributed so that the first and second oxygen flows have a desired oxygen content, and so that the first, second, and third zones of the furnace receive a desired amount of oxygen based on a combustion zone stoichiometry control.

  9. Limited field investigation report for the 100-NR-1 Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-NR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land-use scenarios. This report is unique in that it is based on Hanford-specific agreements discussed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992), the Hanford Site Risk Assessment Methodology (DOE-RL 1994a), the Remedial Investigation Feasibility Study Work Plan for the 100-NR-1 Operable Unit (DOE-RL 1992a), and the Hanford Past-Practice Strategy (HPPS) (DOE-RL 1991), and must be viewed in this context. The HPPS emphasizes initiating and completing waste site cleanup through interim actions. The strategy includes paths for interim decision-making and a final remedy-selection process for the operable unit. A LFI report is required, in accordance with the HPPS, when waste sites are to be considered for IRM and existing data are insufficient to formulate a conceptual model or perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify potential contaminant- and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose a risk to human health or the environment that warrants action through IRM

  10. SEP operating history of the Dresden Nuclear Power Station Unit 2

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1983-01-01

    206 forced shutdowns and power reductions were reviewed, along with 631 reportable events and other miscellaneous documentation concerning the operation of Dresden-2, in order to indicate those areas of plant operation that compromised plant safety. The most serious plant challenge to plant safety occurred on June 5, 1970; while undergoing power testing at 75% power, a spurious signal in the reactor pressure control system caused a turbine trip followed by a reactor scram. Subsequent erratic water level and pressure control in the reactor vessel, compounded by a stuck indicator pen on a water level monitor-recorder and inability of the isolation condenser to function, led to discharge of steam and water through safety valves into the reactor drywell. No significant contamination was discharged. There was no pressure damage or the reactor vessel of the drywell containment walls. Six areas of operation that should be of continued concern are diesel generator failures, control rod and rod drive malfunctions, radioactive waste management/health physics program problems, operator errors, turbine control valve and EHC problems, and HPCI failures. All six event types have continued to recur

  11. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    Science.gov (United States)

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  12. Control rod driving mechanism of reactor, control device and operation method therefor

    International Nuclear Information System (INIS)

    Ariyoshi, Masahiko; Matsumoto, Fujio; Matsumoto, Koji; Kinugasa, Kunihiko; Nara, Yoshihiko; Otama, Kiyomaro; Mikami, Takao

    1998-01-01

    The present invention provides a device for and a method of directly driving control rods of an FBR type reactor linearly by a cylinder type linear motor while having a driving shaft as an electric conductor. Namely, a linear induction motor drives a driving shaft connected with a control rod and vertically moving the control rod by electromagnetic force as an electric conductor. The position of the control rod is detected by a position detector. The driving shaft is hung by a wire by way of an electromagnet which is attachably/detachably held. With such a constitution, the driving shaft connected with the control rod can be vertically moved linearly, stopped or kept. Since they can be driven smoothly at a wide range speed, the responsibility and reliability of the reactor operation can be improved. In addition, since responsibility of the control rod operation is high, scram can be conducted by the linear motor. Since the driving mechanism can be simplified, maintenance and inspection operation can be mitigated. (I.S.)

  13. Control Theory Perspective of Effects-Based Thinking and Operations: Modelling "Operations" as a Feedback Control System

    National Research Council Canada - National Science Library

    Farrell, Philip S

    2007-01-01

    This paper explores operations that involve effects-based thinking (EBT) using Control Theory techniques in order to highlight the concept's fundamental characteristics in a simple and straightforward manner...

  14. SMES application for frequency control during islanded microgrid operation

    International Nuclear Information System (INIS)

    Kim, A-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail

  15. SMES application for frequency control during islanded microgrid operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, A-Rong, E-mail: haven21c@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Gyeong-Hun; Heo, Serim; Park, Minwon [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Yu, In-Keun, E-mail: yuik@changwon.ac.kr [Changwon National University, Sarim-dong, Changwon 641-773 (Korea, Republic of); Kim, Hak-Man [University of Incheon, Songdo-dong, Incheon 406-772 (Korea, Republic of)

    2013-01-15

    Highlights: ► The operating characteristics of SMES for the frequency control of an islanded microgrid were investigated. ► The SMES contributes well for frequency control in the islanded operation. ► A dual and a single magnet type of SMES have been compared to demonstrate the performances. -- Abstract: This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  16. Use of Special Operations Forces in United Nations Missions: a Method to Resolve Complexity

    Science.gov (United States)

    2015-05-21

    physical stamina and psychological stability, followed by a rigorous training program are the imperatives to create SOF soldiers.42 Mark Bowden in...recommendation is that the United Nations should establish a Special Operations planning cell within the UN Department of Peacekeeping Operations. As of...now, the cell is nonexistent. This cell should be able to facilitate the integration of SOF into the overall peace operations concept. Finally, the

  17. The Detector Control Unit An ASIC for the monitoring of the CMS silicon tracker

    CERN Document Server

    Magazzù, G; Moreira, P

    2004-01-01

    The Detector Control Unit (DCU) is an ASIC developed as the central building block of a monitoring system for the CMS Tracker. Leakage currents in the Silicon detectors, power supply voltages of the readout electronics and local temperatures will be monitored in order to guarantee safe operating conditions during the 10-years lifetime in the LHC environment. All these measurements can be performed by an A/D converter preceded by an analog multiplexer and properly interfaced to the central control system. The requirements in terms of radiation tolerance, low-power dissipation and integration with the rest of the system led to the design of a custom integrated circuit. Its structure and characteristics are described in this paper. (6 refs).

  18. The conference hybrid control room

    International Nuclear Information System (INIS)

    Gieci, A.; Caucik, J.; Macko, J.

    2008-01-01

    An original concept of a hybrid control room was developed for the Mochovce-3 and Mochovce-4 reactor units which are under construction. The basic idea underlying the concept is that the control room should be a main working place for the operators (reactor operator and turbine operator) and for the shift supervisor, designed as a comprehensive unit desk shaped so that all members of the control room crew are in a face-to-face contact constantly. The main desk consists of three clearly identified areas serving the operators and the unit supervisor as their main working places. A soft control system is installed at the main working places. A separate safety-related working place, designed as a panel with classical instrumentations at the conference hybrid control room, is provided in case of abnormal conditions or emergency situation. Principles of ergonomics and cognitive engineering were taken into account when designing the new conference hybrid control room for the Mochovce-3 and -4 reactor units. The sizes, propositions, shapes and disposition of the equipment at the control room have been created and verified by using virtual reality tools. (orig.)

  19. Final test results for the ground operations demonstration unit for liquid hydrogen

    Science.gov (United States)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  20. Qualitative risk assessment for the 100-FR-1 source operable unit

    International Nuclear Information System (INIS)

    Corporation, I.T.

    1994-08-01

    This report provides the Qualitative risk assessment (QRA) for the waste sites associated with the 100-FR-1 Operable Unit. The QRA is an evaluation of risk for a predefined set of human and ecological exposure scenarios. It is not intended to replace or be a substitute for a baseline risk assessment. The QRA is streamlined to consider only two human health scenarios (frequent-and occasional-use) with four exposure pathways (soil ingestion, fugitive dust inhalation, inhalation of volatile organics, and external radiation exposure) and a limited ecological evaluation. The use of these scenarios and pathways was agreed to by the 100 Area Tri-Party unit managers