WorldWideScience

Sample records for unit operational control

  1. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  2. Advanced Transport Operating System (ATOPS) control display unit software description

    Science.gov (United States)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  3. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  4. Standard formatted data units-control authority operations

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to illustrate a Control Authority's (CA) possible operation. The document is an interpretation and expansion of the concept found in the CA Procedures Recommendation. The CA is described in terms of the functions it performs for the management and control of data descriptions (metadata). Functions pertaining to the organization of Member Agency Control Authority Offices (MACAOs) (e.g., creating and disbanding) are not discussed. The document also provides an illustrative operational view of a CA through scenarios describing interaction between those roles involved in collecting, controlling, and accessing registered metadata. The roles interacting with the CA are identified by their actions in requesting and responding to requests for metadata, and by the type of information exchanged. The scenarios and examples presented in this document are illustrative only. They represent possible interactions supported by either a manual or automated system. These scenarios identify requirements for an automated system. These requirements are expressed by identifying the information to be exchanged and the services that may be provided by a CA for that exchange.

  5. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  6. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  7. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    International Nuclear Information System (INIS)

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  8. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  9. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    International Nuclear Information System (INIS)

    Delacroix, C.

    1990-01-01

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized [fr

  10. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    Combat/operational stress control, defined as programs and policies to prevent, identify, and manage adverse combat/operational stress reactions, is the primary responsibility of military commanders...

  11. A manned maneuvering unit proximity operations planning and flight guidance display and control system

    Science.gov (United States)

    Gershzohn, Gary R.; Sirko, Robert J.; Zimmerman, K.; Jones, A. D.

    1990-01-01

    This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display

  12. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  13. Data collection on the unit control room simulator as a method of operator reliability analysis

    International Nuclear Information System (INIS)

    Holy, J.

    1998-01-01

    The report consists of the following chapters: (1) Probabilistic assessment of nuclear power plant operation safety and human factor reliability analysis; (2) Simulators and simulations as human reliability analysis tools; (3) DOE project for using the collection and analysis of data from the unit control room simulator in human factor reliability analysis at the Paks nuclear power plant; (4) General requirements for the organization of the simulator data collection project; (5) Full-scale simulator at the Nuclear Power Plants Research Institute in Trnava, Slovakia, used as a training means for operators of the Dukovany NPP; (6) Assessment of the feasibility of quantification of important human actions modelled within a PSA study by employing simulator data analysis; (7) Assessment of the feasibility of using the various exercise topics for the quantification of the PSA model; (8) Assessment of the feasibility of employing the simulator in the analysis of the individual factors affecting the operator's activity; and (9) Examples of application of statistical methods in the analysis of the human reliability factor. (P.A.)

  14. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    .... The role of military mental health professionals in combat/operational stress control is to adapt scientific tools for prevention, identification, and treatment for use by military leaders at all levels...

  15. A control approach for the operation of DG units under variations of interfacing impedance in grid-connected mode

    DEFF Research Database (Denmark)

    Hoseini, S. Kazem; Pouresmaeil, E.; Hosseinnia, S. H.

    2016-01-01

    . However, the converter-based DG interface is subjected to the unexpected uncertainties, which highly influence performance of control loop of DG unit and operation of interfaced converter. The interfacing impedance seen by interfaced VSC may considerably vary in power grid, and the stability of interfaced...... converter is highly sensitive to the impacts of this impedance changes; then, DG unit cannot inject appropriate currents. To deal with the instability problem, a control method based on fractional order active sliding mode is proposed in this paper, which is less sensitive to variations of interfacing...... impedance. A fractional sliding surface, which demonstrates the desired dynamics of system is developed and then, the controller is designed in two phases as sliding and reaching phases to keep the control loop stable. Stability issues of the control method are discussed in details and the conditions...

  16. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units

    International Nuclear Information System (INIS)

    Clausner, J.P.; Jorel, M.

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units

  17. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  18. Modeling and Control of Low Voltage Flexible Units for Enhanced Operation of Distribution Feeders

    DEFF Research Database (Denmark)

    Raboni, Pietro; Hu, Weihao; Chaudhary, Sanjay

    2013-01-01

    In some networks Distributed Generators (DGs) are phasing out conventional power plants in terms of power production but still large efforts are required for providing ancillary services. In this paper the usage of fast response units like a Micro Turbines (MT) and a stationary Electric Vehicle...... Battery (EVB) is proposed for providing primary regulation in grid connected mode and for hierarchically manage an islanded LV distribution feeder. The unit models are described and a novel EVB model directly based on manufacturer’s data is proposed and evaluated comparing its performances with Sim...

  19. The US Air Force Aerial Spray Unit: a history of large area disease vector control operations, WWII through Katrina.

    Science.gov (United States)

    Breidenbaugh, Mark; Haagsma, Karl

    2008-01-01

    The US Air Force has had a long history of aerial applications of pesticides to fulfill a variety of missions, the most important being the protection of troops through the minimization of arthropod vectors capable of disease transmission. Beginning in World War II, aerial application of pesticides by the military has effectively controlled vector and nuisance pest populations in a variety of environments. Currently, the military aerial spray capability resides in the US Air Force Reserve (USAFR), which operates and maintains C-130 airplanes capable of a variety of missions, including ultra low volume applications for vector and nuisance pests, as well as higher volume aerial applications of herbicides and oil-spill dispersants. The USAFR aerial spray assets are the only such fixed-wing aerial spray assets within the Department of Defense. In addition to troop protection, the USAFR Aerial Spray Unit has participated in a number of humanitarian/relief missions, most recently in the response to the 2005 Hurricanes Katrina and Rita, which heavily damaged the Gulf Coasts of Louisiana, Mississippi, and Texas. This article provides historical background on the Air Force Aerial Spray Unit and describes the operations in Louisiana in the aftermath of Hurricane Katrina.

  20. Procedure to evaluate and control efficiently the operations management of medical equipment in the maintenance unit of a health institution

    Directory of Open Access Journals (Sweden)

    Herrera-Galán Michael

    2018-01-01

    Full Text Available Maintenance management plays a very important role in the success of any company. As a consequence of this, in the year of 2013, a study was carried out in health facilities found in the South Eastern Region of Jamaica with the objective of evaluating the existing Maintenance Management Program for Medical Equipment. Among the results obtained, it showed that there is an inadequacy in the existing program whose principal deficiency is attributed to the operations management. As such, this work proposes a procedure for evaluating and controlling in an efficient manner the operations management within the Biomedical Department which forms part of the South East Regional Health Authority Maintenance Unit (SERHAMU, this latter is found on the premises of the Bustamante Hospital for Children (BHC, Jamaica. The method used to develop the procedure (GOMHO is based fundamentally on the design of: a codification system to identify control registers and to record failures associated with each equipment, a system of placing equipment into categories and further differentiating them based on the potential hazard such pose on the human body in the event of an operational failure. In addition, this procedure gives the SERHAMU at the BHC the opportunity to calculate the amount of human resources needed to carry out efficiently the preventative and corrective maintenance work being demanded on the department. During the implementation phase, the results demonstrated that from the control procedure designed there was an improvement in the planning and carrying out of maintenance work and a better system of monitoring the activities that are executed. Also, it was evidenced that there is a 61.53% of the amount of human resources needed to carry out the maintenance actions.

  1. Environmental Control Unit Harness Project

    Science.gov (United States)

    Oliva-Buisson, Yvette J.

    2014-01-01

    Testing four new Environmental Control Unit Harnesses for improved user comfort during SCAPE operations. Phase I, testing in a lab environment, Phase II will continue testing the best candidates in a field environment.

  2. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  3. The operating performance tests of power unit A1 in HPP 'Zvornik' in load-frequency control

    Directory of Open Access Journals (Sweden)

    Stanojčić Vladimir

    2012-01-01

    Full Text Available The turbine-governing system characteristics derived from testing hydropower unit A1 in HPP 'Zvornik' are presented. These tests give insights into the setup state and parameters of the governing system, as well as the qualitative analysis of load-frequency control response of the case study power unit within the power system of Serbia. Verification of relevant turbine-governing parameters was performed by direct application of appropriate standards and policies. The presented results can be used as a basis for the derivation of a turbine governor mathematical model and for a complete mathematical model of a hydropower unit as an element embedded in the power system.

  4. Bidirectional control of a one-dimensional robotic actuator by operant conditioning of a single unit in rat motor cortex

    Directory of Open Access Journals (Sweden)

    Pierre-Jean eArduin

    2014-07-01

    Full Text Available The design of efficient neuroprosthetic devices has become a major challenge for the long-term goal of restoring autonomy to motor-impaired patients. One approach for brain control of actuators consists in decoding the activity pattern obtained by simultaneously recording large neuronal ensembles in order to predict in real-time the subject’s intention, and move the prosthesis accordingly. An alternative way is to assign the output of one or a few neurons by operant conditioning to control the prosthesis with rules defined by the experimenter, and rely on the functional adaptation of these neurons during learning to reach the desired behavioral outcome. Here, several motor cortex neurons were recorded simultaneously in head-fixed awake rats and were conditioned, one at a time, to modulate their firing rate up and down in order to control the speed and direction of a one-dimensional actuator carrying a water bottle. The goal was to maintain the bottle in front of the rat’s mouth, allowing it to drink. After learning, all conditioned neurons modulated their firing rate, effectively controlling the bottle position so that the drinking time was increased relative to chance. The mean firing rate averaged over all bottle trajectories depended non-linearly on position, so that the mouth position operated as an attractor. Some modifications of mean firing rate were observed in the surrounding neurons, but to a lesser extent. Notably, the conditioned neuron reacted faster and led to a better control than surrounding neurons, as calculated by using the activity of those neurons to generate simulated bottle trajectories. Our study demonstrates the feasibility, even in the rodent, of using a motor cortex neuron to control a prosthesis in real-time bidirectionally. The learning process includes modifications of the activity of neighboring cortical neurons, while the conditioned neuron selectively leads the activity patterns associated with the prosthesis

  5. Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

    Energy Technology Data Exchange (ETDEWEB)

    DiSalvo, Rick [Stoller LMS Team, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States); Surovchak, Scott [U.S. Department of Energy, Office of Legacy Management, 11025 Dover St, Suite 1000, Westminster, CO 80021 (United States); Spreng, Carl [Colorado Department of Public Health and Environment, 4300 Cherry Creek Dr. S, Denver, CO 80246-1530 (United States); Moritz, Vera [U.S. Environmental Protection Agency, Region 8, 1595 Wynkoop St., Denver, CO 80202-1129 (United States)

    2013-07-01

    Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plant (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)

  6. Enhanced Master Controller Unit Tester

    Science.gov (United States)

    Benson, Patricia; Johnson, Yvette; Johnson, Brian; Williams, Philip; Burton, Geoffrey; McCoy, Anthony

    2007-01-01

    The Enhanced Master Controller Unit Tester (EMUT) software is a tool for development and testing of software for a master controller (MC) flight computer. The primary function of the EMUT software is to simulate interfaces between the MC computer and external analog and digital circuitry (including other computers) in a rack of equipment to be used in scientific experiments. The simulations span the range of nominal, off-nominal, and erroneous operational conditions, enabling the testing of MC software before all the equipment becomes available.

  7. 47 CFR 90.421 - Operation of mobile station units not under the control of the licensee.

    Science.gov (United States)

    2010-10-01

    ... medical services activities. (3) On the Interoperability Channels in the 700 MHz Public Safety Band (See... in the 700 MHz Public Safety Band or by any licensee holding a license for any other public safety... hand-held and vehicular transmitters in the 700 MHz Band. (b) Industrial/Business Pool. Mobile units...

  8. Stability Analysis for Operation of DG Units in Smart Grids

    DEFF Research Database (Denmark)

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  9. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  10. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  11. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  12. The role of the control room operator

    International Nuclear Information System (INIS)

    Williams, M.C.

    A control room operator at an Ontario Hydro nuclear power plant operates a reactor-turbine unit according to approved procedures within imposed constraints to meet the objectives of the organization. A number of operating and administrative tasks make up this role. Control room operators spend approximately six percent of their time physically operating equipment exclusive of upset conditions, and another one percent operating in upset conditions. Testing occupies five percent of an operator's time. Operators must be trained to recognize the entire spectrum of inputs available to them and use them all effectively. Any change in system or unit state is always made according to an approved procedure. Extensive training is required; operators must be taught and pracised in what to do, and must know the reasons behind their actions. They are expected to memorize emergency procedures, to know when to consult operating procedures, and to have sufficient understanding and practice to perform these procedures reliably

  13. Survey of controllability in decentralized CHP plants. Optimal operation of priority production units; Kortlaegning af decentrale kraftvarmevaerkers regulerbarhed. Optimal drift af prioriterede anlaeg - Teknologisk grundlag

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-03-15

    The present report presents results from two closely related projects, carried out in parallel, under the PSO-F and U 2002. The one project is 'Survey of controllability in de-centralized combined heat and power plants' project number PSO 4724 and is fully reported here. The other project: 'Optimal operation of priority production units, project number PSO 4712, only the part project 'Technological foundations is reported here. In project 4724 the technical conditions that matter regarding controllability of electricity production in de-centralized heat and power stations are surveyed. In this context the term controllability means how fast and to which extent the load factors of the plants can be changed. Also, is has been investigated which options are available for improving the controllability, their potentials and estimates on required investments associated. The investigation covers CHP plants having a production capacity of up to 30 MW of electricity. The main part of the de-centralized CHP plants are based on spark ignited internal combustion engines (Otto engines). Most of these engines are fuelled by natural gas and a smaller part by biogas. A minor number are gas turbines fuelled by natural gas and steam turbines in industrial applications, waste incineration plants or in combined cycle power plants. The mapping has among others consisted of a number of visits on selected different types of plants including interview with people responsible for the daily operation. From these interviews data on the actual operating strategy and technical data have been provided. In addition suppliers of engines and other equipment involved have been contacted for technical information or recommendations regarding possible changes in operation strategy. Searching the Internet has been widely used for identification of technical investigations concerning e.g. operation and maintenance of relevant equipment. Finally, substantial statistical data from

  14. Technical evaluation of the electrical, instrumentation, and control design aspects of the proposed license amendment Revision 1 for single-loop operation of Browns Ferry Nuclear Plants (Docket No. 50-259, Unit 1; Docket No. 50-260, Unit 2; Docket No. 50-296, Unit 3)

    International Nuclear Information System (INIS)

    Donich, T.R.

    1983-01-01

    This report documents the technical evaluation of the proposed changes to the plant reactor protection system by the licensee of Browns Ferry Nuclear Power Station, Units 1, 2, and 3, to account for single-loop plant operation. This evaluation is restricted to only the electrical, instrumentation and control design aspects of proposed changes to the plant technical specifications for single-loop operation beyond 24 hours. Conclusion is that the license amendment for single-loop operation has met the review criteria provided sufficient administrative controls are in effect, and any anomalous control room indicators are corrected or warning-tagged for the duration of single-loop operation

  15. Some problems raised by the operation of large nuclear turbo-generator sets. Automatic control system for steam turbo-generator units

    International Nuclear Information System (INIS)

    Cecconi, F.

    1976-01-01

    The design of an appropriate automatic system was found to be useful to improve the control of large size turbo-generator units so as to provide easy and efficient control and monitoring. The experience of the manufacturer of these turbo-generator units allowed a system well suited for this function to be designed [fr

  16. A computer controlled tele-cobalt unit

    International Nuclear Information System (INIS)

    Brace, J.A.

    1982-01-01

    A computer controlled cobalt treatment unit was commissioned for treating patients in January 1980. Initially the controlling computer was a minicomputer, but now the control of the therapy unit is by a microcomputer. The treatment files, which specify the movement and configurations necessary to deliver the prescribed dose, are produced on the minicomputer and then transferred to the microcomputer using minitape cartridges. The actual treatment unit is based on a standard cobalt unit with a few additional features e.g. the drive motors can be controlled either by the computer or manually. Since the treatment unit is used for both manual and automatic treatments, the operational procedure under computer control is made to closely follow the manual procedure for a single field treatment. The necessary safety features which protect against human, hardware and software errors as well as the advantages and disadvantages of computer controlled radiotherapy are discussed

  17. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  18. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  19. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  20. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  1. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  2. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  3. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  4. Simple Multiplexing Hand-Held Control Unit

    Science.gov (United States)

    Hannaford, Blake

    1989-01-01

    Multiplexer consists of series of resistors, each shunted by single-pole, single-throw switch. User operates switches by pressing buttons or squeezing triggers. Prototype includes three switches operated successfully in over 200 hours of system operations. Number of switches accommodated determined by signal-to-noise ratio of current source, noise induced in control unit and cable, and number of bits in output of analog-to-digital converter. Because many computer-contolled robots have extra analog-to-digital channels, such multiplexer added at little extra cost.

  5. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  6. Operation control device for nuclear power plants

    International Nuclear Information System (INIS)

    Suto, Osamu.

    1982-01-01

    Purpose: To render the controlling functions of a central control console more centralized by constituting the operation controls for a nuclear power plant with computer systems having substantially independent functions such as those of plant monitor controls, reactor monitor management and CRT display and decreasing interactions between each of the systems. Constitution: An input/output device for the input of process data for a nuclear power plant and indication data for a plant control console is connected to a plant supervisory and control computer system and a display computer system, the plant supervisory control computer system and a reactor and management computer system are connected with a CRT display control device, a printer and a CRT display input/output device, and the display computer system is connected with the CRT display control device and the CRT display unit on the central control console, whereby process input can be processed and displayed at high speed. (Yoshino, Y.)

  7. Operational Control of Internal Transport

    NARCIS (Netherlands)

    J.R. van der Meer (Robert)

    2000-01-01

    textabstractOperational Control of Internal Transport considers the control of guided vehicles in vehicle-based internal transport systems found in facilities such as warehouses, production plants, distribution centers and transshipment terminals. The author's interest of research having direct use

  8. IT Strategic and Operational Controls

    CERN Document Server

    Kyriazoglou, J

    2010-01-01

    This book provides a comprehensive guide to implementing an integrated and flexible set of IT controls in a systematic way. It can help organisations to formulate a complete culture for all areas which must be supervised and controlled; allowing them to simultaneously ensure a secure, high standard whilst striving to obtain the strategic and operational goals of the company.

  9. Automatic control unit for neutron transmission measurements

    Energy Technology Data Exchange (ETDEWEB)

    Adib, M.; Abdel-Kawy, A.; Eid, Y.; Ashry, A.; Mostafa, M.; Hamouda, I. (Atomic Energy Establishment, Inshas (Egypt). Reactor and Neutron Physics Dept.)

    1981-01-01

    An automatic transistorized unit has been designed to control the neutron transmission measurements carried out using the time-of-flight spectrometer. The function of the automatic unit is to control the measurements of the neutron counting rate distribution transmitted through a sample at a selected channel group of the time analyzer for a certain preadjusted time period. At the end of this time, the unit removes the sample out of the neutron beam, selects a second equal channel group of the time analyzer and provides the measurement of the neutron counting rate distribution for the same time period as in the case with the sample on. Such a measuring cycle can be repeated as much as the experiment requires. At the end of these cycles the stored information can be immediately obtained through the analyzer read out unit. It is found that the time of removing the sample out of the neutron beam or returning it back does not exceed 20 seconds instead of the five minutes required in case of manual operation. The most important advantages of using such an automatic unit are saving about 20 percent of the reactor operating time avoidng unnecessary radiation exposure of the experimentalists.

  10. The PAMELA storage and control unit

    Energy Technology Data Exchange (ETDEWEB)

    Casolino, M. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy)]. E-mail: Marco.Casolino@roma2.infn.it; Altamura, F. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Basili, A. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); De Pascale, M.P. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Minori, M. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Nagni, M. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Picozza, P. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Sparvoli, R. [INFN, Structure of Rome II, Physics Department, University of Rome II ' Tor Vergata' , I-00133 Rome (Italy); Adriani, O. [INFN, Structure of Florence, Physics Department, University of Florence, I-50019 Sesto Fiorentino (Italy); Papini, P. [INFN, Structure of Florence, Physics Department, University of Florence, I-50019 Sesto Fiorentino (Italy); Spillantini, P. [INFN, Structure of Florence, Physics Department, University of Florence, I-50019 Sesto Fiorentino (Italy); Castellini, G. [CNR-Istituto di Fisica Applicata ' Nello Carrara' , I-50127 Florence (Italy); Boezio, M. [INFN, Structure of Trieste, Physics Department, University of Trieste, I-34147 Trieste (Italy)

    2007-03-01

    The PAMELA Storage and Control Unit (PSCU) comprises a Central Processing Unit (CPU) and a Mass Memory (MM). The CPU of the experiment is based on a ERC-32 architecture (a SPARC v7 implementation) running a real time operating system (RTEMS). The main purpose of the CPU is to handle slow control, acquisition and store data on a 2 GB MM. Communications between PAMELA and the satellite are done via a 1553B bus. Data acquisition from the sub-detectors is performed via a 2 MB/s interface. Download from the PAMELA MM towards the satellite main storage unit is handled by a 16 MB/s bus. The maximum daily amount of data transmitted to ground is about 20 GB.

  11. The PAMELA storage and control unit

    International Nuclear Information System (INIS)

    Casolino, M.; Altamura, F.; Basili, A.; De Pascale, M.P.; Minori, M.; Nagni, M.; Picozza, P.; Sparvoli, R.; Adriani, O.; Papini, P.; Spillantini, P.; Castellini, G.; Boezio, M.

    2007-01-01

    The PAMELA Storage and Control Unit (PSCU) comprises a Central Processing Unit (CPU) and a Mass Memory (MM). The CPU of the experiment is based on a ERC-32 architecture (a SPARC v7 implementation) running a real time operating system (RTEMS). The main purpose of the CPU is to handle slow control, acquisition and store data on a 2 GB MM. Communications between PAMELA and the satellite are done via a 1553B bus. Data acquisition from the sub-detectors is performed via a 2 MB/s interface. Download from the PAMELA MM towards the satellite main storage unit is handled by a 16 MB/s bus. The maximum daily amount of data transmitted to ground is about 20 GB

  12. Control units for APS power supplies

    International Nuclear Information System (INIS)

    Despe, O.D.; Saunders, C.; McGhee, D.G.

    1993-01-01

    The Advanced Photon Source (APS) accelerator facility is made up of five major subsystems in addition to the linac: the positron accumulator ring (PAR), low energy transport (LET), booster synchrotron (SYNCH), high energy transport (HET), the storage ring (SR). Each subsystem has multiple magnet power supply combinations, some requiring multiple of operation. These magnet and power supply combinations computer controlled and monitored. The power supply control unit (PSCU) is the first layer of hardware and software above the power supply itself and is described in this paper. The description includes the basic philosophy for each of operation and how it influences the topology and of implementing control. The design of the analog reference blocks (ARBs) influenced the design of other custom functions well as the feedback controls for vibration and other dynamic corrections. The command set supported by the PSCU is discussed

  13. Hydraulic pressure control unit for control rod drive

    International Nuclear Information System (INIS)

    Watabe, Yukio.

    1990-01-01

    The pressure invention concerns a hydraulic pressure control unit for control rod drives in BWR type reactors. The space above a floating piston possessed by an accumulator and the housing of control rod drives are connected by means of a pipeline. The pipeline has a scram valve which is opened upon occurrence of reactor scram. A pump is disposed between the accumulator and the scram valve for communicating a discharge port to apply a high pressure water to the accumulator. According to the present invention, a control unit is disposed between the scram valve and the housing of the control rod drives in the hydraulic pressure control unit for maintaining the cross sectional area of the flow channel of the pipeline to a usual size when the pressure in a pressure vessel is under a rated operation pressure, while limiting the cross sectional area of the flow channel when the pressure is lower than that in the rated operation. Thus, whole insertion of the control rod substantially at a constant speed is enabled irrespective of the level of the pressure in the pressure vessel. (I.S.)

  14. Substantiation of Structure of Adaptive Control Systems for Motor Units

    Science.gov (United States)

    Ovsyannikov, S. I.

    2018-05-01

    The article describes the development of new electronic control systems, in particular motor units, for small-sized agricultural equipment. Based on the analysis of traffic control systems, the main course of development of the conceptual designs of motor units has been defined. The systems aimed to control the course motion of the motor unit in automatic mode using the adaptive systems have been developed. The article presents structural models of the conceptual motor units based on electrically controlled systems by the operation of drive motors and adaptive systems that make the motor units completely automated.

  15. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  16. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  17. Arbitrating Control of Control and Display Units

    Science.gov (United States)

    Sugden, Paul C.

    2007-01-01

    The ARINC 739 Switch is a computer program that arbitrates control of two multi-function control and display units (MCDUs) between (1) a commercial flight-management computer (FMC) and (2) NASA software used in research on transport aircraft. (MCDUs are the primary interfaces between pilots and FMCs on many commercial aircraft.) This program was recently redesigned into a software library that can be embedded in research application programs. As part of the redesign, this software was combined with software for creating custom pages of information to be displayed on a CDU. This software commands independent switching of the left (pilot s) and right (copilot s) MCDUs. For example, a custom CDU page can control the left CDU while the FMC controls the right CDU. The software uses menu keys to switch control of the CDU between the FMC or a custom CDU page. The software provides an interface that enables custom CDU pages to insert keystrokes into the FMC s CDU input interface. This feature allows the custom CDU pages to manipulate the FMC as if it were a pilot.

  18. Unit costs of waste management operations

    International Nuclear Information System (INIS)

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  19. A case-control study of surgical site infection following operative fixation of fractures of the ankle in a large U.K. trauma unit.

    Science.gov (United States)

    Korim, M T; Payne, R; Bhatia, M

    2014-05-01

    Most of the literature on surgical site infections following the surgical treatment of fractures of the ankle is based on small series of patients, focusing on diabetics or the elderly. None have described post-operative functional scores in those patients who develop an infection. We performed an age- and gender-matched case-control study to identify patient- and surgery-related risk factors for surgical site infection following open reduction and internal fixation of a fracture of the ankle. Logistic regression analysis was used to identify significant risk factors for infection and to calculate odds ratios (OR). Function was assessed using the Olerud and Molander Ankle Score. The incidence of infection was 4% (29/717) and 1.1% (8/717) were deep infections. The median ankle score was significantly lower in the infection group compared with the control group (60 vs 90, Mann-Whitney test p fractures (OR = 4, p = 0.048) were significant risk factors for infection. A low incidence of infection following open reduction and internal fixation of fractures of the ankle was observed. Both superficial and deep infections result in lower functional scores.

  20. Community-owned resource persons for malaria vector control: enabling factors and challenges in an operational programme in Dar es Salaam, United Republic of Tanzania

    Directory of Open Access Journals (Sweden)

    Fillinger Ulrike

    2011-09-01

    Full Text Available Abstract Background Community participation in vector control and health services in general is of great interest to public health practitioners in developing countries, but remains complex and poorly understood. The Urban Malaria Control Program (UMCP in Dar es Salaam, United Republic of Tanzania, implements larval control of malaria vector mosquitoes. The UMCP delegates responsibility for routine mosquito control and surveillance to community-owned resource persons (CORPs, recruited from within local communities via the elected local government. Methods A mixed method, cross-sectional survey assessed the ability of CORPs to detect mosquito breeding sites and larvae, and investigated demographic characteristics of the CORPs, their reasons for participating in the UMCP, and their work performance. Detection coverage was estimated as the proportion of wet habitats found by the investigator which had been reported by CORP. Detection sensitivity was estimated as the proportion of wet habitats found by the CORPS which the investigator found to contain Anopheles larvae that were also reported to be occupied by the CORP. Results The CORPs themselves perceived their role as professional rather than voluntary, with participation being a de facto form of employment. Habitat detection coverage was lower among CORPs that were recruited through the program administrative staff, compared to CORPs recruited by local government officials or health committees (Odds Ratio = 0.660, 95% confidence interval = [0.438, 0.995], P = 0.047. Staff living within their areas of responsibility had > 70% higher detection sensitivity for both Anopheline (P = 0.016 and Culicine (P = 0.012: positive habitats compared to those living outside those same areas. Discussion and conclusions Improved employment conditions as well as involving the local health committees in recruiting individual program staff, communication and community engagement skills are required to optimize

  1. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  2. Lithium control during normal operation

    International Nuclear Information System (INIS)

    Suryanarayan, S.; Jain, D.

    2010-01-01

    Periodic increases in lithium (Li) concentrations in the primary heat transport (PHT) system during normal operation are a generic problem at CANDU® stations. Lithiated mixed bed ion exchange resins are used at stations for pH control in the PHT system. Typically tight chemistry controls including Li concentrations are maintained in the PHT water. The reason for the Li increases during normal operation at CANDU stations such as Pickering was not fully understood. In order to address this issue a two pronged approach was employed. Firstly, PNGS-A data and information from other available sources was reviewed in an effort to identify possible factors that may contribute to the observed Li variations. Secondly, experimental studies were carried out to assess the importance of these factors in order to establish reasons for Li increases during normal operation. Based on the results of these studies, plausible mechanisms/reasons for Li increases have been identified and recommendations made for proactive control of Li concentrations in the PHT system. (author)

  3. Control system for several rotating mirror camera synchronization operation

    Science.gov (United States)

    Liu, Ningwen; Wu, Yunfeng; Tan, Xianxiang; Lai, Guoji

    1997-05-01

    This paper introduces a single chip microcomputer control system for synchronization operation of several rotating mirror high-speed cameras. The system consists of four parts: the microcomputer control unit (including the synchronization part and precise measurement part and the time delay part), the shutter control unit, the motor driving unit and the high voltage pulse generator unit. The control system has been used to control the synchronization working process of the GSI cameras (driven by a motor) and FJZ-250 rotating mirror cameras (driven by a gas driven turbine). We have obtained the films of the same objective from different directions in different speed or in same speed.

  4. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units; Organisation et methodologie appliquees au controle des essais de mise en service pour assurer la surete de fonctionnement des tranches electronucleaires

    Energy Technology Data Exchange (ETDEWEB)

    Clausner, J P; Jorel, M

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units. (author) [French] Au sein de l'Institut de Protection et de Surete Nucleaire (IPSN), le Departement d'Analyse de Surete (DAS) constitue le support technique du Service Central de Surete des Installations Nucleaires (SCSIN) qui est l'autorite de surete francaise. A ce titre, il evalue les programmes d'essais de demarrage et emet un avis sur le traitement des problemes survenus au cours des essais. Pour ce faire, le DAS assure l'analyse du programme d'essais depuis l'elaboration des documents jusqu'a la montee du reacteur a sa puissance nominale. L'evaluation du DAS commence par une analyse approfondie des programmes de principe d'essais (PPE) qui sont etablis par Electricite de France (EDF

  5. Frequency Control for Island Operation of Bornholm Power System

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Zhao, Haoran

    2014-01-01

    the primary frequency control and the DG units are used to provide the secondary frequency control. As such, the proposed control scheme can strike a balance of the frequency control speed and the energy used from the BESS for the frequency control support. The real-time model of the Bornholm power system......This paper presents a coordinated control strategy of a battery energy storage system (BESS) and distributed generation (DG) units for the island operation of the Danish island of Bornholm. The Bornholm power system is able to transit from the grid connected operation with the Nordic power system...... to the isolated island operation. In order to ensure the secure island operation, the coordinated control of the BESS and the DG has been proposed to stabilize the frequency of the system after the transition to the island operation. In the proposed coordinate control scheme, the BESS is used to provide...

  6. The role of heat pipes in intensified unit operations

    International Nuclear Information System (INIS)

    Reay, David; Harvey, Adam

    2013-01-01

    Heat pipes are heat transfer devices that rely, most commonly, on the evaporation and condensation of a working fluid contained within them, with passive pumping of the condensate back to the evaporator. They are sometimes referred to as ‘thermal superconductors’ because of their exceptionally high effective thermal conductivity (substantially higher than any metal). This, together with several other characteristics make them attractive to a range of intensified unit operations, particularly reactors. The majority of modern computers deploy heat pipes for cooling of the CPU. The application areas of heat pipes come within a number of broad groups, each of which describes a property of the heat pipe. The ones particularly relevant to chemical reactors are: i. Separation of heat source and sink. ii. Temperature flattening, or isothermalisation. iii. Temperature control. Chemical reactors, as a heat pipe application area, highlight the benefits of the heat pipe based on isothermalisation/temperature flattening device and on being a highly effective heat transfer unit. Temperature control, done passively, is also of relevance. Heat pipe technology offers a number of potential benefits to reactor performance and operation. The aim of increased yield of high purity, high added value chemicals means less waste and higher profitability. Other intensified unit operations, such as those employing sorption processes, can also profit from heat pipe technology. This paper describes several variants of heat pipe and the opportunities for their use in intensified plant, and will give some current examples. -- Highlights: ► Heat pipes – thermal superconductors – can lead to improved chemical reactor performance. ► Isothermalisation within a reactor vessel is an ideal application. ► The variable conductance heat pipe can control reaction temperatures within close limits. ► Heat pipes can be beneficial in intensified reactors

  7. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Full text: Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which has occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  8. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which have occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  9. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  10. Anticorrosion and halobios control for tidal power generating units

    International Nuclear Information System (INIS)

    Shen, J C; Ding, L X

    2012-01-01

    The anticorrosion and halobios control is the key techniquesrelated to the safety and durability of tidal power generating units. The technique of material application, antifouling coating and cathodic protection are often adopted. The technical research, application, updating and development are carried on Jiangxia Tidal Power Station, which is based on the old Unit 1-Unit 5 operated for nearly 30 years, and the new Unit 6 operated in 2007. It is found that stainless steeland the antifouling coating used in Unit 1- Unit 5 are very effective, but cathodic protection is often likely to fail because of the limitation of structure and installation. Analyses and studies for anticorrosion and halobios control techniques of tidal power generating units according to theory, experience and actual effects have been done, which can be for reference to the tidal power station designers and builders.

  11. MAS2-8 radar and digital control unit

    Science.gov (United States)

    Oberg, J. M.; Ulaby, F. T.

    1974-01-01

    The design of the MAS 2-8 (2 to 8 GHz microwave-active spectrometer), a ground-based sensor system, is presented. A major modification in 1974 to the MAS 2-8, that of a control subsystem to automate the data-taking operation, is the prime focus. The digital control unit automatically changes all system parameters except FM rate and records the return signal on paper tape. The overall system operation and a detailed discussion of the design and operation of the digital control unit are presented.

  12. 49 CFR 236.777 - Operator, control.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operator, control. 236.777 Section 236.777..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.777 Operator, control. An employee assigned to operate the control machine of a traffic control system. ...

  13. Unit area control in California forests

    Science.gov (United States)

    William E. Hallin

    1951-01-01

    There is a definite distinction between the basic concept of unit area control and the specific techniques or treatments used for specific units. Unit area control as a term was first used in connection with a cutting trial in the sugar pine-fir type; consequently, many foresters think the term refers merely to the technique used in sugar pine management, This is not...

  14. Survey method for radiological surveys of 300 FF-1 Operable Unit soil and materials

    International Nuclear Information System (INIS)

    Greif, A.A.

    1997-06-01

    This technical basis document is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by the Radiological Control Technician to determine if excavated areas require continued remediation in accordance with the Record of Decision for the operable unit

  15. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  16. Block diagrams of the radar interface and control unit

    Science.gov (United States)

    Collier, J. W.

    1989-01-01

    The Interface and Control Unit is the heart of the radar module, which occupies one complex channel of the High-Speed Data Acquisition System of the Goldstone Solar System Radar. Block diagrams of the interface unit are presented as an aid to understanding its operation and interconnections to the rest of the radar module.

  17. PI fussy multimodal controller of programmed gains for the operation in the wide range of a turbo gas unit; Controlador PI difuso multimodo de ganancias programadas para la operacion en rango amplio de una unidad turbogas

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Martinez, Arnulfo A.

    2004-11-15

    In this thesis work it was developed a new control algorithm which merges the characteristics of multimode control, gain scheduling control and fuzzy logic techniques, in order to obtain a control system which gives a better gas turbine speed and load control performance, as compared to the current control systems, which are based on conventional PI control algorithms. This new algorithm is intended to provide a better quality control system, which provides both better disturbance rejection response, as well as better reference tracking response. Switching logic (multimode control) and interpolation strategy (gain scheduling) implementation problems are solved applying fuzzy controllers, which retain the advantages of both strategies for non lineal processes in wide operation regions. Since the controllers implemented by the fuzzy system rules are of the same type (PI, Proportional Integral), the multimode gain scheduling fuzzy controller design was reduced to the design of a gain scheduling fuzzy PI controller (PI-GSF). In order to define the gain scheduling scheme, three well-known gain scheduling fuzzy controller design approaches were analyzed and the interpolation mechanism of each of them were compared. The incorporation of a generalized PI controller structure in the local controllers that conform the PI-GSF (see chapter 4), allowed to generate a better control action for both disturbance rejection and reference tracking. As a final product a PI-GSF controller was obtained, which constitutes a more effective control strategy and showed to be a viable solution to the outlined technological problem. With the PI-GSF controller the speed control performance of the generating unit during startup stage, as well as the load control during the generation stage were considerably improved, as compared to the performance obtained with the conventional PI. [Spanish] En este trabajo de tesis se desarrollo un nuevo algoritmo de control que conjunta las caracteristicas de

  18. UNITED STATES SPECIAL OPERATIONS FORCES IN AFRICA

    Science.gov (United States)

    2016-02-16

    hundreds of traditional African religions associated with the plethora of tribal groups as well as large populations of Muslims, primarily in the...engagement, and the complexities of the African continent, Special Operations Forces (SOF) are uniquely suited to further those interests. Additionally...protecting access to abundant strategic resources, fostering integration into the global economy, and empowering Africans and their partners to deal

  19. Operational experience in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1977-01-01

    In the UK there are 26 Magnox reactors and 4 AGRs operating on 11 licensed sites; a further 6 AGRs are under construction on 2 additional and one of the existing sites. The arrangements by which the Nuclear Installations Inspectorate, on behalf of the Health and Safety Executive, carries out its regulatory functions at operating nuclear power plants are described. The range of activities undertaken is described with special reference being made to the biennial shutdowns for approved maintenance and inspections which are required by conditions attached to the site licence. The other means by which the continuing safety of these power reactors is assured are explained and include the relationship with the licensee's own Nuclear Safety Committee, approved arrangements for modifications to plant systems or components which have importance for safety and long term reviews of safety aspects. (author)

  20. Uniting Control Lyapunov and Control Barrier Functions

    NARCIS (Netherlands)

    Romdlony, Zakiyullah; Jayawardhana, Bayu

    2014-01-01

    In this paper, we propose a nonlinear control design for solving the problem of stabilization with guaranteed safety. The design is based on the merging of a Control Lyapunov Function and a Control Barrier Function. The proposed control method allows us to combine the design of a stabilizer based on

  1. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping, surveying...

  2. CNC Turning Center Advanced Operations. Computer Numerical Control Operator/Programmer. 444-332.

    Science.gov (United States)

    Skowronski, Steven D.; Tatum, Kenneth

    This student guide provides materials for a course designed to introduce the student to the operations and functions of a two-axis computer numerical control (CNC) turning center. The course consists of seven units. Unit 1 presents course expectations and syllabus, covers safety precautions, and describes the CNC turning center components, CNC…

  3. Fast reactor operation in the United States

    International Nuclear Information System (INIS)

    Smith, R.R.; Cissel, D.W.

    1978-01-01

    Of the many American facilities dedicated to fast reactor technology, six qualify as liquid-metal-cooled fast reactors. All of these satisfy the following criteria: an unmoderated neutron spectrum, highly enriched fuel material, substantial heat production, and the use of a liquid metal coolant. These include the following: EBR-I Clementine, LAMPRE, EBR-II, EFFBR, and SEFOR. Collectively, these facilities encompassed all of the more important features of liquid-metal-cooled fast reactor technology. Coolant types ranged from mercury in Clementine, to NaK in EBR-I, and sodium in the others. Fuels included enriched-uranium metallic alloys in EBR-I, EBR-II, and EFFBR; metallic plutonium in Clementine; molten plutonium alloy in LAMPRE; and a mixed UO 2 -PuO 2 ceramic in SEFOR. Heat removal techniques ranged from air-blast cooling in LAMPRE and SEFOR; steam-electrical generation in EBR-I, EBR-II, and EFFBR; to a mercury-to-water heat dump in Clementine. Operational experience with such diverse systems has contributed heavily to the U.S. Each of the six systems is described from the viewpoints of purpose, history, design, and operation. Attempts are made to limit descriptive material to the most important features and to refer the reader to a few select references if additional information is needed

  4. EDS operator and control software

    International Nuclear Information System (INIS)

    Ott, L.L.

    1985-04-01

    The Enrichment Diagnostic System (EDS) was developed at Lawrence Livermore National Laboratory (LLNL) to acquire, display and analyze large quantities of transient data for a real-time Advanced Vapor Laser Isotope Separation (AVLIS) experiment. Major topics discussed in this paper are the EDS operator interface (SHELL) program, the data acquisition and analysis scheduling software, and the graphics software. The workstation concept used in EDS, the software used to configure a user's workstation, and the ownership and management of a diagnostic are described. An EDS diagnostic is a combination of hardware and software designed to study specific aspects of the process. Overall system performance is discussed from the standpoint of scheduling techniques, evaluation tools, optimization techniques, and program-to-program communication methods. EDS is based on a data driven design which keeps the need to modify software to a minimum. This design requires a fast and reliable data base management system. A third party data base management product, Berkeley Software System Database, written explicitly for HP1000's, is used for all EDS data bases. All graphics is done with an in-house graphics product, Device Independent Graphics Library (DIGLIB). Examples of devices supported by DIGLIB are: Versatec printer/plotters, Raster Technologies Graphic Display Controllers, and HP terminals (HP264x and HP262x). The benefits derived by using HP hardware and software as well as obstacles imposed by the HP environment are presented in relation to EDS development and implementation

  5. SELFADJUSTING AUTOMATIC CONTROL OF SOWING UNIT

    Directory of Open Access Journals (Sweden)

    A. Yu. Izmaylov

    2015-01-01

    Full Text Available The selfadjusting automatic control of sowing unit and differentiated introduction of mineral fertilizers doses according to agrochemical indicators of the soil (precision agriculture are used wider nowadays. It was defined that the main requirement to the differentiated seeding and fertilizing is an accuracy and duration of transition from one norm to another. Established that at a speed of unit of 10 km/h object moves for 0.5 s about on 1.5 m and more. Thus in this device the radio channel originated differentiated correction is updated in 10 s, and in the RTK mode - 0.5-2 s that breaks the accuracy of introduction of seeds and fertilizers. The block schematic diagram of system of automatic control of technological process of seeding and mineral fertilizing with use of navigation means of machine-tractor aggregates orientation in the field and technical means for realization of technology of precision agriculture at sowing and fertilizers application due to electronic maps of soil fertility and navigation satellite systems was worked out. It was noted that for regulation of a fertilizing dose it is necessary to complete the unit with the electric drive, and for error reduction use navigation GLONASS, GPS, Galileo receivers. To tracking of four leading navigation systems GPS/GLONASS/Galileo/Compass receiver with 32 canals developed by domestic-owned firm «KB NAVIS» was suggested. It was established that the automated device created by All-Russia Research Institute of Mechanization for Agriculture information based on NAVSTAR and GLONASS/GPS system successfully operates seeding and make possible the differentiate fertilizing.

  6. Operational control of large-sized polymer composite units of U-profile circular beam type by X-ray method

    Science.gov (United States)

    Kavalerov, B. V.; Anoshkin, A. N.; Osokin, V. M.; Tretyakov, A. A.; Potrakhov, N. N.; Bessonov, V. B.; Obodovskiy, A. V.

    2018-02-01

    The advantages of using the method of microfocus radiography in the non-destructive testing of aviation products are considered in the paper, using the example of a circular beam of a U-shaped profile made of polymer composite materials. The basic types of characteristic defects of parts arising in such a type are described both in the process of their manufacture and in the process of their exploitation, namely interlayer delaminations, pores and folds. Peculiarities of obtaining pseudo-volumetric images, which allow to increase the informativity about the structure of the object of control, as well as to identify the arising heterogeneities are given. A model of a robotic system is described that makes it possible to realize a small or multi-angle survey scheme, and, in particular, to carry out tomographic studies.

  7. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  8. An Appraisal Of The Operation And Management Of Unit Trust ...

    African Journals Online (AJOL)

    An Appraisal Of The Operation And Management Of Unit Trust Schemes In Nigeria. ... Open Access DOWNLOAD FULL TEXT ... instead of being invested in shares or in money market instruments as a result of widespread financial illiteracy.

  9. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  10. Advanced control room caters for the operator

    International Nuclear Information System (INIS)

    George, C.R.; Rygg, D.E.

    1980-01-01

    In existing control rooms the operators' efficiency is often limited by widely scattered and sometimes illogically arranged controls which tend to increase the potential for outages or equipment damage. The advanced control room described allows instant and ready access to preselected information and control by one or two operators from a seated or standing position. (author)

  11. Explanation of significant differences for the TNX groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1997-01-01

    This Explanation of Significant Differences (ESD) is being issued by the Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concurrence by the Environmental Protection Agency-Region IV (EPA) and South Carolina Department of Health and Environmental Control (SCDHEC) to announce changes in the interim remediation strategy selected for the TNX Groundwater Operable Unit. The TNX Area is located adjacent to the Savannah River in the southwestern portion of SRS. The remedy selected in the Interim Record of Decision (IROD) to achieve the interim action goals was the Hybrid Groundwater Corrective Action (HGCA). The HGCA consisted of a recirculation well system and an air stripper with a series of groundwater extraction wells. The original remediation strategy needs to be modified because the recirculation well system was determined to be ineffective in this area due to geological factors and the nature of the contamination

  12. Operation control device under radiation exposure

    International Nuclear Information System (INIS)

    Kimura, Kiichi; Murakami, Toichi.

    1994-01-01

    The device of the present invention performs smooth progress of operation by remote control for a plurality of operations in periodical inspections in controlled areas of a nuclear power plant, thereby reducing the operator's exposure dose. Namely, the device monitors the progressing state of the operation by displaying the progress of operation on a CRT of a centralized control device present in a low dose area remote from an operation field through an ITV camera disposed in the vicinity of the operation field. Further, operation sequence and operation instruction procedures previously inputted in the device are indicated to the operation field through an operation instruction outputting device (field CRT) in accordance with the progress of the operation steps. On the other hand, the operation progress can be aided by inputting information from the operation field such as start or completion of the operation steps. Further, the device of the present invention can monitor the change of operation circumstances and exposure dose of operators based on the information from a radiation dose measuring device disposed in the operation circumstance and to individual operators. (I.S.)

  13. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  14. Intelligent multi-unit disk controller

    International Nuclear Information System (INIS)

    Poirot, Lucien

    1982-01-01

    This controller has been designed as a link between a 16 bits minicomputer and two types of disks units interface: the SMD interface and an equivalent to the DRI unit interface. Four units of each type can be handled by the controller. A bit slice microprocessor controls the interface with the disks units. The maximum exchange rate is 8 megabits per second. A CRC feature has been provided for error detection. A 16 bits microprocessor implements the interface to the computer, assuring head positioning, the management of bad tracks, as well as the supervision of each transfer. A internal buffer memory allows an asynchronous dialogue with the computer. The implementation of the controller makes easy the adaptation to disks units of various types, and though it has been initially intended for a minicomputer of the MITRA type, its microprocessor based design makes it fitted to any minicomputer. (author) [fr

  15. Control and Operation of Islanded Distribution System

    DEFF Research Database (Denmark)

    Mahat, Pukar

    deviation and real power shift. When a distribution system, with all its generators operating at maximum power, is islanded, the frequency will go down if the total load is more than the total generation. An under-frequency load shedding procedure for islanded distribution systems with DG unit(s) based...... states. Short circuit power also changes when some of the generators in the distribution system are disconnected. This may result in elongation of fault clearing time and hence disconnection of equipments (including generators) in the distribution system or unnecessary operation of protective devices...... operational challenges. But, on the other hand, it has also opened up some opportunities. One opportunity/challenge is an islanded operation of a distribution system with DG unit(s). Islanding is a situation in which a distribution system becomes electrically isolated from the remainder of the power system...

  16. REACTOR CONTROL ROD OPERATING SYSTEM

    Science.gov (United States)

    Miller, G.

    1961-12-12

    A nuclear reactor control rod mechanism is designed which mechanically moves the control rods into and out of the core under normal conditions but rapidly forces the control rods into the core by catapultic action in the event of an emergency. (AEC)

  17. Computer systems for the control of teletherapy units

    International Nuclear Information System (INIS)

    Brace, J.A.

    1985-01-01

    This paper describes a computer-controlled tracking cobalt unit installed at the Royal Free Hospital. It is based on a standard TEM MS90 unit and operates at 90-cm source-axis distance with a geometric field size of 45 x 45 cm at that distance. It has been modified so that it can be used either manually or under computer control. There are nine parameters that can be controlled positionally and two that can be controlled in rate mode; these are presented in a table

  18. CARMENES instrument control system and operational scheduler

    Science.gov (United States)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target

  19. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  20. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  1. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  2. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  3. Unit Testing for Command and Control Systems

    Science.gov (United States)

    Alexander, Joshua

    2018-01-01

    Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

  4. Trainer module for security control center operations

    International Nuclear Information System (INIS)

    Bernard, E.A.

    1982-01-01

    An operator trainer module has been developed to be used with the security control center equipment to be installed as part of a safeguards physical protection system. The module is designed to provide improved training and testing capabilities for control center operators through the use of simulations for perimeter equipment operations. Operators, through the trainer module, can be challenged with a variety of realistic situations which require responsive action identical to that needed in an actual system. This permits a consistent evaluation and confirmation of operator capabilities prior to assignment as an operator and allows for periodic retesting to verify that adequate performance levels are maintained

  5. American Joint Helicopter Command: Addressing a Lack of Operational Control of Rotary Assets

    National Research Council Canada - National Science Library

    Marsowicz, Brandon

    2007-01-01

    ... to achieve unity of effort. Based on the tenets of operational command and control by Milan Vego, across all services, the United States helicopter forces fare lacking operational command and control...

  6. Control principles for blackstart and island operation of microgrid

    Energy Technology Data Exchange (ETDEWEB)

    Laaksonen, H.; Kauhaniemi, K. (University of Vaasa (Finland))

    2008-07-01

    In some unexpected situations a microgrid may become unstable after transition to islanded mode and all DG units must be disconnected from microgrid. In case of these events a restoration strategy for microgrid blackstart is needed. Also if the islanded microgrid is divided into different protection zones in case of a fault, fault management strategy with capability of very fast operation is needed to maintain stability in the healthy section of the islanded microgrid. The control of microgrid voltage and frequency during the microgrid blackstart is not possible without energy storage unit. In this paper sequence of actions for the microgrid blackstart operation as well as control principles of some DG units during blackstart are defined and simulated with two different microgrid configurations. Also one simulation case considering fault management strategy and control principles during fault in islanded microgrid is presented. Based on the simulations dimensioning principles for the needed energy storage and size of simultaneously controlled loads can be drawn. (orig.)

  7. Design of master control unit for laboratory prototype of traction converter for locomotives

    OpenAIRE

    Žák, Jan; Peroutka, Zdeněk; Ovaska, Seppo J.

    2008-01-01

    This paper deals with the prototype of a main traction converter with medium-frequency transformer for AC trolley wire-fed locomotives. The attention is paid to the new master control and diagnostic unit. The designed master control unit has been implemented in the LabVIEW environment. Our master control unit ensures an effective human interface between a user and the control hardware. In this case, the master unit makes possible both extensive control and diagnostic operations of the laborat...

  8. Co-operatives and Normative Control

    DEFF Research Database (Denmark)

    Bregn, Kirsten; Jagd, Søren

    1992-01-01

    This paper explores the conditions for applying normative control in co-operatives. For normative control to be effective two conditions are found particularly important: Individuals must be morally involved and the organization must have a system of making it possible to link common norms...... and individual action. If these conditions are not fulfilled, as may be the case in many co-operatives, normative control cannot be expected to work. The problems of normative control in co-operatives may then not be caused by the use of normative control as such, but may instead be a problem of securing...

  9. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  10. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  11. Operational behaviour of WWER nuclear power units after Chernobyl accident

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.

    2000-01-01

    The indicators of effectiveness of WWER operation, in 1987-1998 were analyzed. For three groups of nuclear units (WWER, NPP Kozloduy, NPP Paks), the trends of Indicators flow were established. The comparative analysis of forced outage rate, and load factor of WWERs and nuclear units all in the world was carried out; it gives the general picture of accident influence on the states and the relations of these indicators in considered period (author)

  12. On Point: The United States Army in Operation Iraqi Freedom

    Science.gov (United States)

    2004-01-01

    to retain operational context. Moreover, times noted in the text have been adjusted from Greenwich Mean Time (“ Zulu ”) to local Kuwait time (+ 3...TF 1-64 AR unit history is composed of short narratives for each subordinate unit. Most cite times in zulu . 34. Ibid. 35. Ibid. Numbers of enemy...places in the world. Inside the city cemetery is the Tomb of Ali, son-in-law and cousin to Mohammed and founder of the Shiite sect. Coalition leaders

  13. Automatic exchange unit for control rod drive device

    International Nuclear Information System (INIS)

    Nasu, Seiji; Sasaki, Masayoshi.

    1982-01-01

    Purpose: To enable automatic reoperation and continuation without external power interruption remedy device at the time of recovering the interrupted power soruce during automatic positioning operation. Constitution: In case of an automatic exchange unit for a control rod drive device of the control type for setting the deviation between the positioning target position and the present position of the device to zero, the position data of the drive device of the positioning target value of the device is automatically read, and an interlock of operation inhibit is applied to a control system until the data reading is completed and automatic operation start or restart conditions are sequentially confirmed. After the confirmation, the interlock is released to start the automatic operation or reoperation. Accordingly, the automatic operation can be safely restarted and continued. (Yoshihara, H.)

  14. 28 CFR 541.49 - Review of control unit placement.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Review of control unit placement. 541.49... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.49 Review of control unit placement. (a) Unit staff shall evaluate informally and daily an inmate's adjustment within the control unit...

  15. Controlling operational risk: Concepts and practices

    NARCIS (Netherlands)

    van den Tillaart, A.H.A.J.

    2003-01-01

    The subject of this thesis is controlling 'operational risk' in banks. Operational risk is defined as the risk of losses resulting from inadequate or failed internal processes, people, systems, or from external events. Within this very broad subject, we focus on the place of operational risk

  16. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  17. Implementation of Active Learning Method in Unit Operations II Subject

    OpenAIRE

    Ma'mun, Sholeh

    2018-01-01

    ABSTRACT: Active Learning Method which requires students to take an active role in the process of learning in the classroom has been applied in Department of Chemical Engineering, Faculty of Industrial Technology, Islamic University of Indonesia for Unit Operations II subject in the Even Semester of Academic Year 2015/2016. The purpose of implementation of the learning method is to assist students in achieving competencies associated with the Unit Operations II subject and to help in creating...

  18. Power generation, operation and control

    CERN Document Server

    Wood, Allen J; Sheblé, Gerald B

    2013-01-01

    Since publication of the second edition, there have been extensive changes in the algorithms, methods, and assumptions in energy management systems that analyze and control power generation. This edition is updated to acquaint electrical engineering students and professionals with current power generation systems. Algorithms and methods for solving integrated economic, network, and generating system analysis are provided. Also included are the state-of-the-art topics undergoing evolutionary change, including market simulation, multiple market analysis, multiple interchange contract analysis, c

  19. Computer control for remote wind turbine operation

    Energy Technology Data Exchange (ETDEWEB)

    Manwell, J.F.; Rogers, A.L.; Abdulwahid, U.; Driscoll, J. [Univ. of Massachusetts, Amherst, MA (United States)

    1997-12-31

    Light weight wind turbines located in harsh, remote sites require particularly capable controllers. Based on extensive operation of the original ESI-807 moved to such a location, a much more sophisticated controller than the original one has been developed. This paper describes the design, development and testing of that new controller. The complete control and monitoring system consists of sensor and control inputs, the control computer, control outputs, and additional equipment. The control code was written in Microsoft Visual Basic on a PC type computer. The control code monitors potential faults and allows the turbine to operate in one of eight states: off, start, run, freewheel, low wind shut down, normal wind shutdown, emergency shutdown, and blade parking. The controller also incorporates two {open_quotes}virtual wind turbines,{close_quotes} including a dynamic model of the machine, for code testing. The controller can handle numerous situations for which the original controller was unequipped.

  20. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  1. 40 CFR 75.34 - Units with add-on emission controls.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Units with add-on emission controls... add-on emission controls. (a) The owner or operator of an affected unit equipped with add-on SO2 and... assurance/quality control program for the unit, required by section 1 in appendix B of this part. To provide...

  2. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  3. Engineering Process Monitoring for Control Room Operation

    OpenAIRE

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close coll...

  4. General predictive control using the delta operator

    DEFF Research Database (Denmark)

    Jensen, Morten Rostgaard; Poulsen, Niels Kjølstad; Ravn, Ole

    1993-01-01

    This paper deals with two-discrete-time operators, the conventional forward shift-operator and the δ-operator. Both operators are treated in view of construction of suitable solutions to the Diophantine equation for the purpose of prediction. A general step-recursive scheme is presented. Finally...... a general predictive control (GPC) is formulated and applied adaptively to a continuous-time plant...

  5. Automatic operation device for control rods

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1984-01-01

    Purpose: To enable automatic operation of control rods based on the reactor operation planning, and particularly, to decrease the operator's load upon start up and shutdown of the reactor. Constitution: Operation plannings, demand for the automatic operation, break point setting value, power and reactor core flow rate change, demand for operation interrupt, demand for restart, demand for forecasting and the like are inputted to an input device, and an overall judging device performs a long-term forecast as far as the break point by a long-term forecasting device based on the operation plannings. The automatic reactor operation or the like is carried out based on the long-term forecasting and the short time forecasting is performed by the change in the reactor core status due to the control rod operation sequence based on the control rod pattern and the operation planning. Then, it is judged if the operation for the intended control rod is possible or not based on the result of the short time forecasting. (Aizawa, K.)

  6. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  7. Development of control system in abdominal operating ROV

    Directory of Open Access Journals (Sweden)

    ZHANG Weikang

    2017-03-01

    Full Text Available In order to satisfy all the requirements of Unmanned Underwater Vehicle(UUVrecovery tasks, a new type of abdominal operating Remote Operated Vehicle(ROV was developed. The abdominal operating ROV is different from the general ROV which works by a manipulator, as it completes the docking and recovery tasks of UUVs with its abdominal operating mechanism. In this paper, the system composition and principles of the abdominal operating ROV are presented. We then propose a framework for a control system in which the integrated industrial reinforced computer acts as a surface monitor unit, while the PC104 embedded industrial computer acts as the underwater master control unit and the other drive boards act as the driver unit. In addition, the dynamics model and a robust H-infinity controller for automatic orientation in the horizontal plane were designed and built. Single tests, system tests and underwater tests show that this control system has good real-time performance and reliability, and it can complete the recovery task of a UUV. The presented structure and algorithm could have reference significance to the control system development of mobile robots, drones, and biomimetic robot.

  8. Operating control techniques for maglev transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Kraft, K H; Schnieder, E

    1984-06-01

    The technical and operational possibilities of magnetic levitation transport systems can only be fully exploited by introducing 'intelligent' control systems which ensure automatic and trouble-free train running. The solution of exacting requirements in the fields of traction dynamics, security and control as well as information gathering transmission and processing is an important prior condition in that respect. The authors report here on the present state of research and development in operating control techniques applicable to maglev transport systems.

  9. Computer control of shielded cell operations

    International Nuclear Information System (INIS)

    Jeffords, W.R. III.

    1987-01-01

    This paper describes in detail a computer system to remotely control shielded cell operations. System hardware, software, and design criteria are discussed. We have designed a computer-controlled buret that provides a tenfold improvement over the buret currently in service. A computer also automatically controls cell analyses, calibrations, and maintenance. This system improves conditions for the operators by providing a safer, more efficient working environment and is expandable for future growth and development

  10. Adaptation of Professional Skills in the Unit Operations Laboratory

    Science.gov (United States)

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  11. Pressure Swing Adsorption in the Unit Operations Laboratory

    Science.gov (United States)

    Ganley, Jason

    2018-01-01

    This paper describes a student laboratory in the Unit Operations Laboratory at the Colorado School of Mines: air separation by pressure swing adsorption. The flexibility of the system enables students to study the production of enriched nitrogen or oxygen streams. Automatic data acquisition permits the study of cycle steps and performance.…

  12. Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 1

    Science.gov (United States)

    1994-06-01

    units would be reused in the remedy. Contingency measures to be included in the remedy are potential metals removal prior to water end use, potential...onbase reuse of a portion of the water, and wellhead treatment on offbase supply wells. The contingency measures will only be implemented if necessary...94 LEGEND Ouatmar aluvi dposts agua Frmaion(cosoldatd aluval epoits W iead rdetilnsMhte omtin(neitccnlmeae ansoe9ndkeca F 70 Quvatei-lernayalvu e pk

  13. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  14. Optimal operation of cogeneration units. State of art and perspective

    International Nuclear Information System (INIS)

    Polimeni, S.

    2001-01-01

    Optimal operation of cogeneration plants and of power plant fueling waste products is a complex challenge as they have to fulfill, beyond the contractual obligation of electric power supply, the constraints of supplying the required thermal energy to the user (for cogeneration units) or to burn completely the by-products of the industrial complex where they are integrated. Electrical power market evolution is pushing such units to a more and more volatile operation caused by uncertain selling price levels. This work intends to pinpoint the state of art in the optimization of these units outlining the important differences among the different size and cycles. The effect of the market liberalization on the automation systems and the optimization algorithms will be discussed [it

  15. Nuclear thermal rocket engine operation and control

    International Nuclear Information System (INIS)

    Gunn, S.V.; Savoie, M.T.; Hundal, R.

    1993-06-01

    The operation of a typical Rover/Nerva-derived nuclear thermal rocket (NTR) engine is characterized and the control requirements of the NTR are defined. A rationale for the selection of a candidate diverse redundant NTR engine control system is presented and the projected component operating requirements are related to the state of the art of candidate components and subsystems. The projected operational capabilities of the candidate system are delineated for the startup, full-thrust, shutdown, and decay heat removal phases of the engine operation. 9 refs

  16. Hardware interface unit for control of shuttle RMS vibrations

    Science.gov (United States)

    Lindsay, Thomas S.; Hansen, Joseph M.; Manouchehri, Davoud; Forouhar, Kamran

    1994-01-01

    Vibration of the Shuttle Remote Manipulator System (RMS) increases the time for task completion and reduces task safety for manipulator-assisted operations. If the dynamics of the manipulator and the payload can be physically isolated, performance should improve. Rockwell has developed a self contained hardware unit which interfaces between a manipulator arm and payload. The End Point Control Unit (EPCU) is built and is being tested at Rockwell and at the Langley/Marshall Coupled, Multibody Spacecraft Control Research Facility in NASA's Marshall Space Flight Center in Huntsville, Alabama.

  17. Centrifugal microfluidic platforms: advanced unit operations and applications.

    Science.gov (United States)

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-07

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  18. Intelligent tutors for control center operator training

    Energy Technology Data Exchange (ETDEWEB)

    Vale, Z.A. [Porto Univ. (Portugal). Dept. of Electrical and Computer Engineering; Fernandes, M.F.; Marques, A. [Electricity of Portugal, Sacavem (Portugal)

    1995-12-31

    Power systems are presently remotely operated and controlled from control centers that receive on-line information about the power system state. Control center operators have very high-demanding tasks what makes their training a key issue for the performance of the whole power system. Simulators are usually used by electrical utilities for this purpose but they are very expensive applications and their use requires the preparation of the training sessions by qualified training staff which is a very time consuming task. Due to this, these simulators are only used a few times a year. Intelligent Tutoring Systems (ITS) provide some new possibilities for control center operator training making easier its use without much assistance of the teaching staff. On the other hand, an expert system in use in a control center can be adapted to an ITS to train operators without much effort. 18 refs

  19. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  20. 28 CFR 541.47 - Admission to control unit.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Admission to control unit. 541.47 Section... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.47 Admission to control unit. Staff shall provide an inmate admitted to a control unit with: (a) Notice of the projected duration of...

  1. 28 CFR 541.50 - Release from a control unit.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Release from a control unit. 541.50... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.50 Release from a control unit. (a) Only the Executive Panel may release an inmate from a control unit. The following factors are...

  2. 28 CFR 541.48 - Search of control unit inmates.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Search of control unit inmates. 541.48... INMATE DISCIPLINE AND SPECIAL HOUSING UNITS Control Unit Programs § 541.48 Search of control unit inmates. (a) The Warden at an institution housing a control unit may order a digital or simple instrument...

  3. Intelligent Control and Operation of Distribution System

    DEFF Research Database (Denmark)

    Bhattarai, Bishnu Prasad

    methodology to ensure efficient control and operation of the future distribution networks. The major scientific challenge is thus to develop control models and strategies to coordinate responses from widely distributed controllable loads and local generations. Detailed models of key Smart Grid (SG) elements...... in this direction but also benefit distribution system operators in the planning and development of the distribution network. The major contributions of this work are described in the following four stages: In the first stage, an intelligent Demand Response (DR) control architecture is developed for coordinating...... the key SG actors, namely consumers, network operators, aggregators, and electricity market entities. A key intent of the architecture is to facilitate market participation of residential consumers and prosumers. A Hierarchical Control Architecture (HCA) having primary, secondary, and tertiary control...

  4. Modeling Control Situations in Power System Operations

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Singh, Sri Niwas

    2010-01-01

    for intelligent operation and control must represent system features, so that information from measurements can be related to possible system states and to control actions. These general modeling requirements are well understood, but it is, in general, difficult to translate them into a model because of the lack...... of explicit principles for model construction. This paper presents a work on using explicit means-ends model based reasoning about complex control situations which results in maintaining consistent perspectives and selecting appropriate control action for goal driven agents. An example of power system......Increased interconnection and loading of the power system along with deregulation has brought new challenges for electric power system operation, control and automation. Traditional power system models used in intelligent operation and control are highly dependent on the task purpose. Thus, a model...

  5. Enhancing Safety at Airline Operations Control Centre

    Directory of Open Access Journals (Sweden)

    Lukáš Řasa

    2015-04-01

    Full Text Available In recent years a new term of Safety Management System (SMS has been introduced into aviation legislation. This system is being adopted by airline operators. One of the groundbased actors of everyday operations is Operations Control Centre (OCC. The goal of this article has been to identify and assess risks and dangers which occur at OCC and create a template for OCC implementation into SMS.

  6. Operational Assessment of Controller Complexity, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — In today's operations, acceptable levels of controller workload are maintained by assigning sector capacities based on simple aircraft count and a capacity threshold...

  7. Engineering Process Monitoring for Control Room Operation

    CERN Document Server

    Bätz, M

    2001-01-01

    A major challenge in process operation is to reduce costs and increase system efficiency whereas the complexity of automated process engineering, control and monitoring systems increases continuously. To cope with this challenge the design, implementation and operation of process monitoring systems for control room operation have to be treated as an ensemble. This is only possible if the engineering of the monitoring information is focused on the production objective and is lead in close collaboration of control room teams, exploitation personnel and process specialists. In this paper some principles for the engineering of monitoring information for control room operation are developed at the example of the exploitation of a particle accelerator at the European Laboratory for Nuclear Research (CERN).

  8. Developing control room operator selection procedures

    International Nuclear Information System (INIS)

    Bosshardt, M.J.; Bownas, D.A.

    1979-01-01

    PDRI is performing a two-year study to identify the tasks performed and attributes required in electric power generating plant operating jobs, and focusing on the control room operator position. Approximately 65 investor-owned utilities are participating in the study

  9. Automatic Control of Freeboard and Turbine Operation

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter Bak; Friis-Madsen, Erik

    The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003.......The report deals with the modules for automatic control of freeboard and turbine operation on board the Wave dragon, Nissum Bredning (WD-NB) prototype, and covers what has been going on up to ultimo 2003....

  10. Operational trade-offs in reservoir control

    Science.gov (United States)

    Georgakakos, Aris P.

    1993-11-01

    Reservoir operation decisions require constant reevaluation in the face of conflicting objectives, varying hydrologic conditions, and frequent operational policy changes. Optimality is a relative concept very much dependent on the circumstances under which a decision is made. More than anything else, reservoir management authorities need the means to assess the impacts of various operational options. It is their responsibility to define what is desirable after a thorough evaluation of the existing circumstances. This article presents a model designed to generate operational trade-offs common among reservoir systems. The model avoids an all-encompassing problem formulation and distinguishes three operational modes (levels) corresponding to normal, drought, and flood operations. Each level addresses only relevant system elements and uses a static and a dynamic control module to optimize turbine performance within each planning period and temporally. The model is used for planning the operation of the Savannah River System.

  11. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  12. Control of xenon oscillations in large PWRs result of control in Mihama Unit No.3 Reactor

    International Nuclear Information System (INIS)

    Shimazu, Yoichiro; Itahara, Kuniyuki; Nishimura, Takeshi.

    1977-01-01

    Recently, constant axial offset control method for power distribution control is applied to PWRs (of Westinghouse type). In this mode of operation, Xe induced spatial oscillations which could cause the problem from the power distribution point of view hardly break out. Under special conditions such as tests, however, Xe oscillations can break out. It is required that power distribution can be controlled without any special operational actions. Several control methods for Xe oscillations have been reported through many theoretical studies and operational experiences. Among them is First Overtone Control Method. This requires quite a simple control action but can effectively control Xe oscillations. The authors have shown the effectiveness of First Overtone Control Method in Mihama Unit No. 3 Reactor. In this report the detailed procedures are described. The outline of Constant Axial Offset Control Method is described in Appendix. (auth.)

  13. Adding control to arbitrary unknown quantum operations

    Science.gov (United States)

    Zhou, Xiao-Qi; Ralph, Timothy C.; Kalasuwan, Pruet; Zhang, Mian; Peruzzo, Alberto; Lanyon, Benjamin P.; O'Brien, Jeremy L.

    2011-01-01

    Although quantum computers promise significant advantages, the complexity of quantum algorithms remains a major technological obstacle. We have developed and demonstrated an architecture-independent technique that simplifies adding control qubits to arbitrary quantum operations—a requirement in many quantum algorithms, simulations and metrology. The technique, which is independent of how the operation is done, does not require knowledge of what the operation is, and largely separates the problems of how to implement a quantum operation in the laboratory and how to add a control. Here, we demonstrate an entanglement-based version in a photonic system, realizing a range of different two-qubit gates with high fidelity. PMID:21811242

  14. Control of peripheral units by satellite computer

    International Nuclear Information System (INIS)

    Tran, K.T.

    1974-01-01

    A computer system was developed allowing the control of nuclear physics experiments, and use of the results by means of graphical and conversational assemblies. This system which is made of two computers, one IBM-370/135 and one Telemecanique Electrique T1600, controls the conventional IBM peripherals and also the special ones made in the laboratory, such as data acquisition display and graphics units. The visual display is implemented by a scanning-type television, equipped with a light-pen. These units in themselves are universal, but their specifications were established to meet the requirements of nuclear physics experiments. The input-output channels of the two computers have been connected together by an interface, designed and implemented in the Laboratory. This interface allows the exchange of control signals and data (the data are changed from bytes into word and vice-versa). The T1600 controls the peripherals mentionned above according to the commands of the IBM370. Hence the T1600 has here the part of a satellite computer which allows conversation with the main computer and also insures the control of its special peripheral units [fr

  15. Nuclear material control in the United States

    International Nuclear Information System (INIS)

    Jaeger, C.; Waddoups, I.

    1995-01-01

    The Department of Energy has defined a safeguards system to be an integrated system of physical protection, material accounting and material control subsystems designed to deter, prevent, detect, and respond to unauthorized possession, use, or sabotage of SNM. In practice, safeguards involve the development and application of techniques and procedures dealing with the establishment and continued maintenance of a system of activities. The system must also include administrative controls and surveillance to assure that the procedures and techniques of the system are effective and are being carried out. The control of nuclear material is critical to the safeguarding of nuclear materials within the United States. The U.S. Department of Energy includes as part of material control four functional performance areas. They include access controls, material surveillance, material containment and detection/assessment. This paper will address not only these areas but also the relationship between material control and other safeguards and security functions

  16. Applying interactive control to waste processing operations

    International Nuclear Information System (INIS)

    Grasz, E.L.; Merrill, R.D.; Couture, S.A.

    1992-08-01

    At present waste and residue processing includes steps that require human interaction. The risk of exposure to unknown hazardous materials and the potential for radiation contamination motivates the desire to remove operators from these processes. Technologies that facilitate this include glove box robotics, modular systems for remote and automated servicing, and interactive controls that minimize human intervention. LLNL is developing an automated system which is designed to supplant the operator for glove box tasks, thus protecting the operator from the risk of radiation exposure and minimizing operator-associated waste. Although most of the processing can be automated with minimal human interaction, there are some tasks where intelligent intervention is both desirable and necessary to adapt to Enexpected circumstances and events. These activities require that the operator interact with the process using a remote manipulator which provides or reflects a natural feel to the operator. The remote manipulation system which was developed incorporates sensor fusion and interactive control, and provides the operator with an effective means of controlling the robot in a potentially unknown environment. This paper describes recent accomplishments in technology development and integration, and outlines the future goals of Lawrence Livermore National Laboratory for achieving this integrated interactive control capability

  17. Plant status control - with an operational focus

    International Nuclear Information System (INIS)

    Lane, L.A.

    2000-01-01

    In the Nuclear industry, we have done a very good job of designing, developing, constructing, and improving our nuclear facilities. We have, however, often been inconsistent in documenting the details of our facilities, clearly addressing the rules around facility operation, and controlling and tracking the temporary, or permanent changes to our facilities. The reality is, that once we build a facility, we then must operate the facility, for it to be viable. Further we must operate it safely and efficiently for the facility to produce its product, and be acceptable to the public. Unfortunately, when we design and build these large, complicated facilities, we cannot project all the nuances of facility operation, although we can recognize this potential gap, and prepare for it. In order to allow for the complexities of the real world, we must provide the individuals who are tasked with operating our nuclear facilities, with the tools and processes to deal with 'all the nuances' of facility operation. This discussion will focus on the concepts behind a key process for ensuring that we meet our design and operating needs for our facilities, as well as recognizing and dealing with the potential gaps. The key process is 'Plant Status Control', and the discussion will have a primary focus on the needs of the end users, that being the individuals that have the immediate and current accountability for control and safety of the facility, the equipment, the staff, and ultimately the public, that being our Operations staff, and the Shift Manager. (author)

  18. Hydrocarbon control strategies for gasoline marketing operations

    Energy Technology Data Exchange (ETDEWEB)

    Norton, R.L.; Sakaida, R.R.; Yamada, M.M.

    1978-05-01

    This informational document provides basic and current descriptions of gasoline marketing operations and methods that are available to control hydrocarbon emissions from these operations. The three types of facilities that are described are terminals, bulk plants, and service stations. Operational and business trends are also discussed. The potential emissions from typical facilities, including transport trucks, are given. The operations which lead to emissions from these facilities include (1) gasoline storage, (2) gasoline loading at terminals and bulk plants, (3) gasoline delivery to bulk plants and service stations, and (4) the refueling of vehicles at service stations. Available and possible methods for controlling emissions are described with their estimated control efficiencies and costs. This report also includes a bibliography of references cited in the text, and supplementary sources of information.

  19. CV controls from design to operation

    CERN Document Server

    Blanc, D

    2002-01-01

    The cooling and Ventilation (CV) group has emphasised the need to redefine its organisational structure at the end of 98. The main objective of this operation was to ensure the CV group to be more competitive and efficient through the growing tasks of the LHC projects. The main evolution given to this reorganisation is that the new structure is more project oriented and then operates on three distinct axes: Design, Work and Operation. Process control project management requires a complete and early interaction and participation of all the actors involved. This procedure to be efficient and constructive must be considered and performed not only during the design stage but along the project planning phases and must go beyond the completion work including the process control operation activity. The paper explains the present project management for process control. It describes the present constraints and gives suggestions to a different approach to these projects to improve performances and efficiency of a contr...

  20. Hydrate Control for Gas Storage Operations

    Energy Technology Data Exchange (ETDEWEB)

    Jeffrey Savidge

    2008-10-31

    The overall objective of this project was to identify low cost hydrate control options to help mitigate and solve hydrate problems that occur in moderate and high pressure natural gas storage field operations. The study includes data on a number of flow configurations, fluids and control options that are common in natural gas storage field flow lines. The final phase of this work brings together data and experience from the hydrate flow test facility and multiple field and operator sources. It includes a compilation of basic information on operating conditions as well as candidate field separation options. Lastly the work is integrated with the work with the initial work to provide a comprehensive view of gas storage field hydrate control for field operations and storage field personnel.

  1. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant, including decommissioning. (authors)

  2. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    Full text: This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant. (authors)

  3. Control of TFTR during DT operations

    International Nuclear Information System (INIS)

    Pearson, G.G.; Alling, P.D.; Blanchard, W.; Camp, R.A.; Hawryluk, R.J.; Hosea, J.C.; Nagy, A.

    1995-01-01

    Since beginning routine D-T operations in December, 1993, there have been more than 500 DT plasmas and approximately 600,000 Ci of tritium processed through TFTR culminating in greater than 10 MW of fusion power produced in a single discharge in November, 1994. These performance levels were achieved while maintaining the highest levels of personnel and equipment safety. Prior to D-T operations, a Chain of Command structure and a TFTR Shift Supervisor (TFTRSS) position were developed for centralized control of the facility with all subsystems reporting to this position. A comprehensive surveillance system was incorporated such that the TFTR SS could easily review the operational readiness of subsystems for D-T operations. A TFTR SS Station was constructed to facilitate monitoring and control of TFTR. This station includes a camera system, FAX, a networked personal computer, a computerized tritium monitor and control system and a hardware interlock system. In the transition from D-D to D-T operations, TFTR's procedures were reviewed/revised and a number of additional procedures developed for control of activities at the facility. This paper details the equipment, administrative and organizational configurations used for controlling TFTR during D-T operations

  4. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    International Nuclear Information System (INIS)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-01-01

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  5. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  6. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  7. Operational advanced materials control and accountability system

    International Nuclear Information System (INIS)

    Malanify, J.J.; Bearse, R.C.; Christensen, E.L.

    1980-01-01

    An accountancy system based on the Dynamic Materials Accountability (DYMAC) System has been in operation at the Plutonium Processing Facility at the Los Alamos Scientific Laboratory (LASL) since January 1978. This system, now designated the Plutonium Facility/Los Alamos Safeguards System (PF/LASS), has enhanced nuclear material accountability and process control at the LASL facility. The nondestructive assay instruments and the central computer system are operating accurately and reliably. As anticipated, several uses of the system have developed in addition to safeguards, notably scrap control and quality control. The successes of this experiment strongly suggest that implementation of DYMAC-based systems should be attempted at other facilities. 20 refs

  8. Note: Wide-operating-range control for thermoelectric coolers

    Science.gov (United States)

    Peronio, P.; Labanca, I.; Ghioni, M.; Rech, I.

    2017-11-01

    A new algorithm for controlling the temperature of a thermoelectric cooler is proposed. Unlike a classic proportional-integral-derivative (PID) control, which computes the bias voltage from the temperature error, the proposed algorithm exploits the linear relation that exists between the cold side's temperature and the amount of heat that is removed per unit time. Since this control is based on an existing linear relation, it is insensitive to changes in the operating point that are instead crucial in classic PID control of a non-linear system.

  9. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  10. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  11. Digital control for turbogas units; Control digital para unidades turbogas

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Beltran, Carlos Daniel

    1997-02-01

    The present thesis deals with the rehabilitation of the control system for the gas turbines W501 of the Gomez Palacio Combined Cycle Power Station in the state of Durango, Mexico. The first part of the development deals with a re-engineering process of software applied to the digital control system of the gas turbines of the Gomez Palacio Combined Cycle Power Station. This process was developed using concepts of several branches of engineering: a) involved the knowledge of the software engineering, using formal methods for the analysis of the original system and the redesign of the new system; b) The control engineering was used in the analysis of diverse control and automation strategies employed for gas turbines control, with the objective of verifying the type of instructions and existing routines within the software. The final product of this stage is a modulated programmatic system, based on structured design that is functionally a mirror image of the original system. The system obtained conformed by five main modules which are based on a model proposed originally for control by batch: i) Man Machine Interface, ii) Regulatory Control, iii) Protections, iv) Logic sequences and v) Supervision. The second stage of development was the improvement of the speed control of the turbine. When a turbogas unit is controlled, it must be taken into account several operation stages such as the starting, the control in stable state and the shut down. The real behavior of the turbine during the starting, and mainly the great number of backward movements produced, proposed by itself the search of a new controller who more closely maintained the acceleration specifications whereupon the turbine was designed. The development of a new control algorithm began with the analysis of the process, trying to identify which are the critical stages of this one and be able to evaluate in an objective form the advantages of an algorithm upon the other. It was continued with the

  12. Control system for a nuclear power producing unit

    International Nuclear Information System (INIS)

    Durrant, O.W.

    1978-01-01

    The invention provides in a control system for a nuclear power producing unit comprising a pressurized water reactor, a once-through steam generator provided with feedwater supply means, a turbine-generator supplied with steam from the steam generator and means maintaining a flow of pressurized water through the reactor and steam generator. The combination comprising; means generating a feed forward control signal proportional to the desired power output of the power producing unit, a second means for adjusting the reactor heat release, a third means for adjusting the rate of flow of feedwater to the steam generator, the second and third means solely responsive to and operated in parallel from the feed forward control signal whereby the reactor heat release and the rate of flow of feedwater to the steam generator are each maintained in a discrete functional relationship to the feed forward control signal

  13. Heat recovery unit operation of HVAC system in IMEF

    International Nuclear Information System (INIS)

    Paek, S. R.; Oh, Y. W.; Song, E. S.; Park, D. K.; Joo, Y. S.; Hong, K. P.

    2003-01-01

    HVAC system including a supply and exhaust air system in IMEF(Irradiated Materials Examination Facility) is an essential facility for preventing a leakage of radioactive materials and for a preservation of a working environment. It costs a lot to operate the HVAC system in IMEF because our ventilation type is once-through system, and an air flow is maintained from low level contamination area to high level and maintained high turns of ventilation air under certain conditions. As HRU(Heat Recovery Unit) at HVAC system based on PIEF(Post Irradiation Examination Facility) operation experiences is designed and adopted, it prevents from a heating coil freezing destruction in winter and makes much energy saving etc.. Heat pipe type HRU is adopted in IMEF, and a construction and operation result of HRU is examined

  14. Nuclear safety risk control in the outage of CANDU unit

    International Nuclear Information System (INIS)

    Wu Mingliang; Zheng Jianhua

    2014-01-01

    Nuclear fuel remains in the core during the outage of CANDU unit, but there are still nuclear safety risks such as reactor accidental criticality, fuel element failure due to inability to properly remove residual heat. Furthermore, these risks are aggravated by the weakening plant system configuration and multiple cross operations during the outage. This paper analyzes the phases where there are potential nuclear safety risks on the basis of the typical critical path arrangement of the outage of Qinshan NPP 3 and introduces a series of CANDU-specific risk control measures taken during the past plant outages to ensure nuclear safety during the unit outage. (authors)

  15. Control unit of a nuclear reactor

    International Nuclear Information System (INIS)

    Desfontaines, Guy; Le Helloco, Michel.

    1981-01-01

    Control unit comprising multiple leak-tight vessels, in communication with the inside of the reactor vessel, extending this vessel above its cover, in the vertical direction and each one enclosing a mechanism for moving a cluster of material absorbing the neutrons in the reactor core, actuated by a motor. This control unit is of reduced height above the vessel cover and provides efficient protection of the leak tight containments and the mechanisms in the event of earthquakes, easy removal and refitting of the vessel cover, good ventilation of the power devices of the mechanisms without the use of a complex ventilation system, efficient thermal insulation of the leak-tight containments assembly, as well as easy access to the motors and mechanism located in the leak-tight containment for carrying out any maintenance and repairs that might be required [fr

  16. 21 CFR 211.22 - Responsibilities of quality control unit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Responsibilities of quality control unit. 211.22... Personnel § 211.22 Responsibilities of quality control unit. (a) There shall be a quality control unit that... have been fully investigated. The quality control unit shall be responsible for approving or rejecting...

  17. United Nations International Drug Control Programme responds

    Directory of Open Access Journals (Sweden)

    Michael Platzer

    2002-01-01

    Full Text Available [First paragraph] We would like to reply to the article written by Axel Klein entitled, "Between the Death Penalty and Decriminalization: New Directions for Drug Control in the Commonwealth Caribbean" published in NWIG 75 (3&4 2001. We have noted a number of factual inaccuracies as well as hostile comments which portray the United Nations International Drug Control Programme in a negative light. This reply is not intended to be a critique of the article, which we find unbalanced and polemical, but rather an alert to the tendentious statements about UNDCP, which we feel should be corrected.

  18. Operational experience with the CEBAF control system

    International Nuclear Information System (INIS)

    Hovater, C.; Chowdhary, M.; Karn, J.; Tiefenback, M.; Zeijts, J. van; Watson, W.

    1996-01-01

    The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics

  19. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    International Nuclear Information System (INIS)

    Brehm, D.M.

    1998-06-01

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  20. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  1. The operation of the GANIL control system

    International Nuclear Information System (INIS)

    Prome, M.; David, L.; Lecorche, E.

    1984-06-01

    When the first GANIL beams were obtained the control system was operating in an elementary way; the system behaved almost like a huge multiplexer. Now a large number of programs have been written; they allow to take benefit of the full power of the computers; they help the operators for starting, tuning and monitoring the accelerator. The paper gives a general description of these programs which are executed on the central computer: it shows how the accelerator is controlled either directly or via dedicated microprocessors. Informations are also given on the alarm system

  2. The quality of operative notes at a general surgery unit.

    Science.gov (United States)

    Rogers, A; Bunting, M; Atherstone, A

    2008-09-01

    With the increasingly litigious nature of medical practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in a general surgery unit in order to improve our practice. An audit of 100 consecutive operative notes was performed, and notes were assessed using the Royal College of Surgeons guidelines. The quality of note-taking of trainees was compared with that of consultant surgeons. A series of operation note pro formas was designed in response to the findings. Of the notes, 66% were completed by trainees. The vast majority of notes had no diagram to demonstrate the surgical findings or illustrate the actions. Specialist surgeons were more likely to describe the actions accurately, but less likely to describe wound closure methods or dressings used. They were also less likely to complete adequate postoperative orders. This study identifies key areas of weakness in our operative note-keeping. Pro formas should be introduced and made available for commonly performed procedures, and diagrams should be used wherever possible.

  3. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  4. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  5. Operation and control of ITER plasmas

    International Nuclear Information System (INIS)

    2001-01-01

    Features incorporated in the design of the International Thermonuclear Experimental Reactor (ITER) tokamak and its ancillary and plasma diagnostic systems that will facilitate operation and control of ignited and/or high-Q DT plasmas are presented. Control methods based upon straight-forward extrapolation of techniques employed in the present generation of tokamaks are found to be adequate and effective for DT plasma control with burn durations of ≥1000 s. Examples of simulations of key plasma control functions including magnetic configuration control and fusion burn (power) control are given. The prospects for the creation and control of steady-state plasmas sustained by non-inductive current drive are also discussed. (author)

  6. Operation and control of ITER plasmas

    International Nuclear Information System (INIS)

    1999-01-01

    Features incorporated in the design of the International Thermonuclear Experimental Reactor (ITER) tokamak and its ancillary and plasma diagnostic systems that will facilitate operation and control of ignited and/or high-Q DT plasmas are presented. Control methods based upon straight-forward extrapolation of techniques employed in the present generation of tokamaks are found to be adequate and effective for DT plasma control with burn durations of ≥1000 s. Examples of simulations of key plasma control functions including magnetic configuration control and fusion burn (power) control are given. The prospects for the creation and control of steady-state plasmas sustained by non-inductive current drive are also discussed. (author)

  7. Lithium-Ion Cell Charge Control Unit

    Science.gov (United States)

    Reid, Concha; Button, Robert; Manzo, Michelle; McKissock, Barbara; Miller, Thomas; Gemeiner, Russel; Bennett, William; Hand, Evan

    2006-01-01

    Life-test data of Lithium-Ion battery cells is critical in order to establish their performance capabilities for NASA missions and Exploration goals. Lithium-ion cells have the potential to replace rechargeable alkaline cells in aerospace applications, but they require a more complex charging scheme than is typically required for alkaline cells. To address these requirements in our Lithium-Ion Cell Test Verification Program, a Lithium-Ion Cell Charge Control Unit was developed by NASA Glenn Research Center (GRC). This unit gives researchers the ability to test cells together as a pack, while allowing each cell to charge individually. This allows the inherent cell-to-cell variations to be addressed on a series string of cells and results in a substantial reduction in test costs as compared to individual cell testing. The Naval Surface Warfare Center at Crane, Indiana developed a power reduction scheme that works in conjunction with the Lithium-Ion Cell Charge Control Unit. This scheme minimizes the power dissipation required by the circuitry to prolong circuit life and improve its reliability.

  8. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  9. Feasibility Study for Operable Unit 7-13/14

    International Nuclear Information System (INIS)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-01-01

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  10. Feasibility Study for Operable Unit 7-13/14

    Energy Technology Data Exchange (ETDEWEB)

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  11. Article separation apparatus and method for unit operations

    Science.gov (United States)

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  12. Stress, performance, and control room operations

    International Nuclear Information System (INIS)

    Fontaine, C.W.

    1990-01-01

    The notion of control room operator performance being detrimentally affected by stress has long been the focus of considerable conjecture. It is important to gain a better understanding of the validity of this concern for the development of effective severe-accident management approaches. This paper illustrates the undeniable negative impact of stress on a wide variety of tasks. A computer-controlled simulated work environment was designed in which both male and female operators were closely monitored during the course of the study for both stress level (using the excretion of the urine catecholamines epinephrine and norepinephrine as an index) and job performance. The experimental parameters employed by the study when coupled with the subsequent statistical analyses of the results allow one to make some rather striking comments with respect to how a given operator might respond to a situation that he or she perceives to be psychologically stressful (whether the stress be externally or internally generated). The findings of this study clearly indicated that stress does impact operator performance on tasks similar in nature to those conducted by control room operators and hence should be seriously considered in the development of severe-accident management strategies

  13. Nuclear power plant control room operator control and monitoring tasks

    International Nuclear Information System (INIS)

    Bovell, C.R.; Beck, M.G.; Carter, R.J.

    1998-01-01

    Oak Ridge National Laboratory is conducting a research project the purpose of which is to develop the technical bases for regulatory review criteria for use in evaluating the safety implications of human factors associated with the use of artificial intelligence and expert systems, and with advanced instrumentation and control (I and C) systems in nuclear power plants (NPP). This report documents the results from Task 8 of that project. The primary objectives of the task was to identify the scope and type of control and monitoring tasks now performed by control-room operators. Another purpose was to address the types of controls and safety systems needed to operate the nuclear plant. The final objective of Task 8 was to identify and categorize the type of information and displays/indicators required to monitor the performance of the control and safety systems. This report also discusses state-of-the-art controls and advanced display devices which will be available for use in control-room retrofits and in control room of future plants. The fundamental types of control and monitoring tasks currently conducted by operators can be divided into four classifications: function monitoring tasks, control manipulation tasks, fault diagnostic tasks, and administrative tasks. There are three general types of controls used in today's NPPs, switches, pushbuttons, and analog controllers. Plant I and C systems include components to achieve a number of safety-related functions: measuring critical plant parameters, controlling critical plant parameters within safety limits, and automatically actuating protective devices if safe limits are exceeded. The types of information monitored by the control-room operators consist of the following parameters: pressure, fluid flow and level, neutron flux, temperature, component status, water chemistry, electrical, and process and area radiation. The basic types of monitoring devices common to nearly all NPP control rooms include: analog meters

  14. Infection control in the intensive care unit.

    Science.gov (United States)

    Osman, Mohamed F; Askari, Reza

    2014-12-01

    It is critical for health care personnel to recognize and appreciate the detrimental impact of intensive care unit (ICU)-acquired infections. The economic, clinical, and social expenses to patients and hospitals are overwhelming. To limit the incidence of ICU-acquired infections, aggressive infection control measures must be implemented and enforced. Researchers and national committees have developed and continue to develop evidence-based guidelines to control ICU infections. A multifaceted approach, including infection prevention committees, antimicrobial stewardship programs, daily reassessments-intervention bundles, identifying and minimizing risk factors, and continuing staff education programs, is essential. Infection control in the ICU is an evolving area of critical care research. Copyright © 2014 Elsevier Inc. All rights reserved.

  15. Initial operation of NSTX with plasma control

    International Nuclear Information System (INIS)

    Gates, D.; Bell, M.; Ferron, J.; Kaye, S.; Menard, J.; Mueller, D.; Neumeyer, C.; Sabbagh, S.

    2000-01-01

    First plasma, with a maximum current of 300kA, was achieved on NSTX in February 1999. These results were obtained using preprogrammed coil currents. The first controlled plasmas on NSTX were made starting in August 1999 with the full 1MA plasma current achieved in December 1999. The controlled quantities were plasma position (R, Z) and current (Ip). Variations in the plasma shape are achieved by adding preprogrammed currents to those determined by the control parameters. The control system is fully digital, with plasma position and current control, data acquisition, and power supply control all occurring in the same four-processor real time computer. The system uses the PCS (Plasma Control Software) system designed at General Atomics. Modular control algorithms, specific to NSTX, were written and incorporated into the PCS. The application algorithms do the actual control calculations, with the PCS handling data passing. The control system, including planned upgrades, will be described, along with results of the initial controlled plasma operations. Analysis of the performance of the control system will also be presented

  16. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  17. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  18. Operational aerial snow surveying in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Peck, E L; Carroll, T R; Vandemark, S C

    1980-03-01

    An airborne gamma radiation detector and data acquisition system has been designed for rapid measurement of the snow cover water equivalent over large open areas. Research and field tests conducted prior to the implementation of an operational snow measurement system in the United States are reviewed. Extensive research test flights were conducted over large river basins of the north-central plains and in the high mountain valleys of the inter-mountain West. Problems encountered during development include: (1) error in the gross gamma flux produced by atmospheric radon gas daughters; (2) spatial and temporal variability in soil moisture; and (3) errors in gamma radiation count rate introduced by aircraft and cosmic background radiation. Network design of operational flight line and ground observation data used in a river forecasting system are discussed. 22 references, 4 figures, 2 tables.

  19. Operator approach to linear control systems

    CERN Document Server

    Cheremensky, A

    1996-01-01

    Within the framework of the optimization problem for linear control systems with quadratic performance index (LQP), the operator approach allows the construction of a systems theory including a number of particular infinite-dimensional optimization problems with hardly visible concreteness. This approach yields interesting interpretations of these problems and more effective feedback design methods. This book is unique in its emphasis on developing methods for solving a sufficiently general LQP. Although this is complex material, the theory developed here is built on transparent and relatively simple principles, and readers with less experience in the field of operator theory will find enough material to give them a good overview of the current state of LQP theory and its applications. Audience: Graduate students and researchers in the fields of mathematical systems theory, operator theory, cybernetics, and control systems.

  20. Control procedure for well drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Bourdon, J C

    1988-09-09

    A control procedure of rotary drilling operations is proposed. It uses the Drill off test. The drill-off test permits to determine the rock drill speed variation as a function of the wright applied on the top of the pipe. We can deduce from that a rock drill wear parameter. The method permits to prevent a rupture and its grave economic consequences.

  1. Quantum circuits cannot control unknown operations

    International Nuclear Information System (INIS)

    Araújo, Mateus; Feix, Adrien; Costa, Fabio; Brukner, Časlav

    2014-01-01

    One of the essential building blocks of classical computer programs is the ‘if’ clause, which executes a subroutine depending on the value of a control variable. Similarly, several quantum algorithms rely on applying a unitary operation conditioned on the state of a control system. Here we show that this control cannot be performed by a quantum circuit if the unitary is completely unknown. The task remains impossible even if we allow the control to be done modulo a global phase. However, this no-go theorem does not prevent implementing quantum control of unknown unitaries in practice, as any physical implementation of an unknown unitary provides additional information that makes the control possible. We then argue that one should extend the quantum circuit formalism to capture this possibility in a straightforward way. This is done by allowing unknown unitaries to be applied to subspaces and not only to subsystems. (paper)

  2. Actuator digital interface unit (AIU). [control units for space shuttle data system

    Science.gov (United States)

    1973-01-01

    Alternate versions of the actuator interface unit are presented. One alternate is a dual-failure immune configuration which feeds a look-and-switch dual-failure immune hydraulic system. The other alternate is a single-failure immune configuration which feeds a majority voting hydraulic system. Both systems communicate with the data bus through data terminals dedicated to each user subsystem. Both operational control data and configuration control information are processed in and out of the subsystem via the data terminal which yields the actuator interface subsystem, self-managing within its failure immunity capability.

  3. Advanced Control Test Operation (ACTO) facility

    International Nuclear Information System (INIS)

    Ball, S.J.

    1987-01-01

    The Advanced Control Test Operation (ACTO) project, sponsored by the US Department of Energy (DOE), is being developed to enable the latest modern technology, automation, and advanced control methods to be incorporated into nuclear power plants. The facility is proposed as a national multi-user center for advanced control development and testing to be completed in 1991. The facility will support a wide variety of reactor concepts, and will be used by researchers from Oak Ridge National Laboratory (ORNL), plus scientists and engineers from industry, other national laboratories, universities, and utilities. ACTO will also include telecommunication facilities for remote users

  4. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  5. Operator interface to the ORIC control system

    International Nuclear Information System (INIS)

    Ludemann, C.A.; Casstevens, B.J.

    1983-01-01

    The Oak Ridge Isochronous Cyclotron (ORIC) was built in the early 1960s with a hard-wired manual control system. Presently, it serves as a variable-energy heavy-ion cyclotron with an internal ion source, or as an energy booster for the new 25 MV tandem electrostatic accelerator of the Holifield Heavy Ion Facility. One factor which has kept the cyclotron the productive research tool it is today is the gradual transfer of its control functions to a computer-based system beginning in the 1970s. This particular placement of a computer between an accelerator and its operators afforded some unique challenges and opportunities that would not be encountered today. Historically, the transformation began at a time when computers were just beginning to gain acceptance as reliable operational tools. Veteran operators with tens of years of accelerator experience justifiably expressed skepticism that this improvement would aid them, particularly if they had to re-learn how to operate the machine. The confidence of the operators was gained when they realized that one of the primary principles of ergonomics was being upheld. The computer software and hardware was being designed to serve them and not the computer

  6. Control of water chemistry in operating reactors

    International Nuclear Information System (INIS)

    Riess, R.

    1997-01-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ''modified'' B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs

  7. Control of water chemistry in operating reactors

    Energy Technology Data Exchange (ETDEWEB)

    Riess, R [Siemens AG Unternehmensbereich KWU, Erlangen (Germany)

    1997-02-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ``modified`` B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs.

  8. Operational controlling - a tool of translating strategy into action

    Directory of Open Access Journals (Sweden)

    2011-03-01

    Full Text Available . Enterprises have a lot of problems with realization their strategic aims in the fast changing and competitive business arena from many years. Effective execution of strategic plan needs its translating into action, task results and indicators of everyday activities. The success on the market is attainable by communicating strategic and operating goals on the each level of organizational structure and their connecting with budget of units or employee motivation. The scorecards balancing in finance, customer, process and development perspectives is very useful for pointing - what do we control with? or - what do we have to achieve? But doesn't answer to question about ways of enterprise managing. Main aim of the article is proving that operational controlling system is a essential tool for translating strategy into action. The Balanced Scorecard methodology should to take into consideration system and process connection of enterprise with procurement, co-operation or distribution supply chain also.

  9. Management and Operational Control of Criticality

    Energy Technology Data Exchange (ETDEWEB)

    Daniels, J. T. [Authority Health and Safety Branch, United Kingdom Atomic Energy Authority, Risley, Lancs. (United Kingdom)

    1966-05-15

    The evidence of the six process criticality accidents that have been reported to date shows that, without exception, they have been due to the failure of operational controls. In no instance has a criticality accident in processing been due to the use of wrong data 01 inaccurate calculation. Criticality accidents are least likely to occur in the production stream and are more likely to be associated with ancillary equipment and operations. Important as correct criticality calculations are, there are many other considerations which require the exercise of judgement in establishing the operational environment. No operation involving fissile material should be permitted without a formal review resulting in a documented statement of (a) the environmental assessment, (b) the nuclear safety arguments which demonstrate safety under that environment, and (c) the operational requirements which will ensure the validity of (b) under the conditions of (a). To ensure the continued viability of the environmental assessment and the continued reliability of clearance conditions there should be close supervision by operating management, and periodic checks made by site nuclear safety staff. Additionally, there should be periodic and systematic examinations by competent persons who are not responsible to the overall management of the site. (author)

  10. 21 CFR 870.4300 - Cardiopulmonary bypass gas control unit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cardiopulmonary bypass gas control unit. 870.4300... bypass gas control unit. (a) Identification. A cardiopulmonary bypass gas control unit is a device used to control and measure the flow of gas into the oxygenator. The device is calibrated for a specific...

  11. Google Home: smart speaker as environmental control unit.

    Science.gov (United States)

    Noda, Kenichiro

    2017-08-23

    Environmental Control Units (ECU) are devices or a system that allows a person to control appliances in their home or work environment. Such system can be utilized by clients with physical and/or functional disability to enhance their ability to control their environment, to promote independence and improve their quality of life. Over the last several years, there have been an emergence of several inexpensive, commercially-available, voice activated smart speakers into the market such as Google Home and Amazon Echo. These smart speakers are equipped with far field microphone that supports voice recognition, and allows for complete hand-free operation for various purposes, including for playing music, for information retrieval, and most importantly, for environmental control. Clients with disability could utilize these features to turn the unit into a simple ECU that is completely voice activated and wirelessly connected to appliances. Smart speakers, with their ease of setup, low cost and versatility, may be a more affordable and accessible alternative to the traditional ECU. Implications for Rehabilitation Environmental Control Units (ECU) enable independence for physically and functionally disabled clients, and reduce burden and frequency of demands on carers. Traditional ECU can be costly and may require clients to learn specialized skills to use. Smart speakers have the potential to be used as a new-age ECU by overcoming these barriers, and can be used by a wider range of clients.

  12. LOFT advanced control room operator diagnostic and display system (ODDS)

    International Nuclear Information System (INIS)

    Larsen, D.G.; Robb, T.C.

    1980-01-01

    The Loss-of-Fluid Test (LOFT) Reactor Facility in Idaho includes a highly instrumented nuclear reactor operated by the Department of Energy for the purpose of establishing nuclear safety requirements. The results of the development and installation into LOFT of an Operator Diagnostic and Display System (ODDS) are presented. The ODDS is a computer-based graphics display system centered around a PRIME 550 computer with several RAMTEK color graphic display units located within the control room and available to the reactor operators. Use of computer-based color graphics to aid the reactor operator is discussed. A detailed hardware description of the LOFT data system and the ODDS is presented. Methods and problems of backfitting the ODDS equipment into the LOFT plant are discussed

  13. Intelligent systems supporting the control room operators

    International Nuclear Information System (INIS)

    Berger, E.

    1997-01-01

    The operational experience obtained with the various applications of the systems discussed in this paper shows that more consequent use of the systems will make detection and management of disturbances still more efficient and faster. This holds true both for a low level of process automation and for power plants with a high level of automation. As for conventional power plants, the trend clearly is towards higher degrees of automation and consequent application of supporting systems. Thus, higher availability and rapid failure management are achieved, at low effects on normal operation. These systems are monitoring and process control systems, expert systems, and systems for optimal use of the equipment, or systems for post-incident analyses and computer-assisted on-shift protocols, or operating manuals. (orig./CB) [de

  14. [Controlling systems for operating room managers].

    Science.gov (United States)

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  15. Skill retention and control room operator competency

    International Nuclear Information System (INIS)

    Stammers, R.B.

    1981-12-01

    The problem of skill retention in relation to the competency of control room operators is addressed. Although there are a number of related reviews of the literature, this particular topic has not been examined in detail before. The findings of these reviews are summarised and their implications for the area discussed. The limited research on skill retention in connection with process control is also reviewed. Some topics from cognitive and instructional psychology are also raised. In particular overlearning is tackled and the potential value of learning strategies is assessed. In conclusion the important topic of measurement of performance is introduced and a number of potentially valuable training approaches are outlined. (author)

  16. Space Telescope Control System science user operations

    Science.gov (United States)

    Dougherty, H. J.; Rossini, R.; Simcox, D.; Bennett, N.

    1984-01-01

    The Space Telescope science users will have a flexible and efficient means of accessing the capabilities provided by the ST Pointing Control System, particularly with respect to managing the overal acquisition and pointing functions. To permit user control of these system functions - such as vehicle scanning, tracking, offset pointing, high gain antenna pointing, solar array pointing and momentum management - a set of special instructions called 'constructs' is used in conjuction with command data packets. This paper discusses the user-vehicle interface and introduces typical operational scenarios.

  17. Bisimulations for Delimited-Control Operators

    OpenAIRE

    Biernacki , Dariusz; Lenglet , Sergueï; Polesiuk , Piotr

    2017-01-01

    We propose a survey of the behavioral theory of an untyped lambda-calculus extended with the delimited-control operators shift and reset. We define a contextual equivalence for this calculus, that we then aim to characterize with coinductively defined relations, called bisimilarities. We study different styles of bisimilarities (namely applicative, normal form, and environmental), and we give several examples to illustrate their respective strengths and weaknesses. We also discuss how to exte...

  18. Control Transfer in Operating System Kernels

    Science.gov (United States)

    1994-05-13

    microkernel system that runs less code in the kernel address space. To realize the performance benefit of allocating stacks in unmapped kseg0 memory, the...review how I modified the Mach 3.0 kernel to use continuations. Because of Mach’s message-passing microkernel structure, interprocess communication was...critical control transfer paths, deeply- nested call chains are undesirable in any case because of the function call overhead. 4.1.3 Microkernel Operating

  19. 21 CFR 111.127 - What quality control operations are required for packaging and labeling operations?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... and Process Control System: Requirements for Quality Control § 111.127 What quality control operations are required for packaging and labeling operations? Quality control operations for packaging and...

  20. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  1. Operation of the radioactive acid digestion test unit

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1980-01-01

    The Radioactive Acid Digestion Test Unit (RADTU) has been constructed at Hanford to demonstrate the application of the Acid Digestion Process for treating combustible transuranic wastes and scrap materials. The RADTU with its original tray digestion vessel has recently completed a six-month campaign processing potentially contaminated nonglovebox wastes from a Hanford plutonium facility. During this campaign, it processed 2100 kg of largely cellulosic wastes at an average sustained processing rate of 3 kg/h as limited by the water boiloff rate from the acid feeds. The on-line operating efficiency was nearly 50% on a twelve hour/day, five day/week basis. Following this campaign, a new annular high rate digester has been installed for testing. In preliminary tests with simulated wastes, the new digester demonstrated a sustained capacity of 10 kg/h with greatly improved intimacy of contact between the digestion acid and the waste. The new design also doubles the heat transfer surface, which with reduced heat loss area, is expected to provide at least three times the water boiloff rate of the previous tray digester design. Following shakedown testing with simulated and low-level wastes, the new unit will be used to process combustible plutonium scrap and waste from Hanford plutonium facilities for the purposes of volume reduction, plutonium recovery, and stabilization of the final waste form

  2. Contextual control of discriminated operant behavior.

    Science.gov (United States)

    Bouton, Mark E; Todd, Travis P; León, Samuel P

    2014-01-01

    Previous research has suggested that changing the context after instrumental (operant) conditioning can weaken the strength of the operant response. That result contrasts with the results of studies of Pavlovian conditioning, in which a context switch often does not affect the response elicited by a conditioned stimulus. To begin to make the methods more similar, Experiments 1-3 tested the effects of a context switch in rats on a discriminated operant response (R; lever pressing or chain pulling) that had been reinforced only in the presence of a 30-s discriminative stimulus (S; tone or light). As in Pavlovian conditioning, responses and reinforcers became confined to presentations of the S during training. However, in Experiment 1, after training in Context A, a switch to Context B caused a decrement in responding during S. In Experiment 2, a switch to Context B likewise decreased responding in S when Context B was equally familiar, equally associated with reinforcement, or equally associated with the training of a discriminated operant (a different R reinforced in a different S). However, there was no decrement if Context B had been associated with the same response that was trained in Context A (Experiments 2 and 3). The effectiveness of S transferred across contexts, whereas the strength of the response did not. Experiment 4 found that a continuously reinforced response was also disrupted by context change when the same response manipulandum was used in both training and testing. Overall, the results suggest that the context can have a robust general role in the control of operant behavior. Mechanisms of contextual control are discussed.

  3. Self operation type reactor control device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1990-01-01

    A boiling-requefication chamber containing transporting materials having somewhat higher boiling point that the usual reactor operation temperature and liquid neutron absorbers having a boiling point sufficiently higher than that of the transporting materials is disposed near the coolant exit of a fuel assembly and connected with a tubular chamber in the reactor core with a moving pipe at the bottom. Since the transporting materials in the boiling-requefication chamber is boiled and expanded by heating, the liquid neutron absorbers are introduced passing through the moving pipe into the cylindrical chamber to control the nuclear reactions. When the temperature is lowered by the control, the transporting materials are liquefied to contract the volume and the liquid neutron absorbers in the cylindrical chamber are returned passing through the moving tube into the boiling-liquefication chamber to make the nuclear reaction vigorous. Thus, self-operation type power conditioning and power stopping are enabled not by way of control rods and not requiring external control, to prevent scram failure or misoperation. (N.H.)

  4. 14 CFR 23.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 23.1142... Powerplant Controls and Accessories § 23.1142 Auxiliary power unit controls. Means must be provided on the... power unit. [Doc. No. 26344, 58 FR 18974, Apr. 9, 1993] ...

  5. An automatic control unit for A neutron diffraction crystal spectrometer

    International Nuclear Information System (INIS)

    Adib, M.; Abbas, Y.; Mostafa, M.; Hamouda, I.

    1982-01-01

    An automatic transistorized unit has been designed and constructed to control the operation of the double axis crystal spectrometer installed in front of one of the horizontal channels of the ET-RR-1 reactor. The function of the automatic unit is to store the diffracted neutrons at a certain angle with respect to the direction of the incident neutron beam in a selected channel of a 1024-multichannel analyzer for a certain preadjusted time period. AT the end of this time period the unit rotates the spectrometer's arm to another angle, selects the next channel of the MCA and provides the measurement of the diffracted neutron for the same time period. Such a sequence is repeated automatically over all angles required for the neutron diffraction pattern of the sample under investigation. As a result, the stored information at the MCA provides the neutron diffraction pattern as a function of channel number, where each channel corresponds to a certain scattering angle. The stored distribution at MCA can be obtained through the analyzer read out unit. The designed automatic unit has the possibility of providing the neutron diffraction pattern using a 6-digit scaler and a printer

  6. Automatic control unit for A neutron diffraction crystal spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    Adib, M.; Abbas, Y.; Mostafa, M.; Hamouda, I.

    1982-01-01

    An automatic transistorized unit has been designed and constructed to control the operation of the double axis crystal spectrometer installed in front of one of the horizontal channels of the ET-RR-1 reactor. The function of the automatic unit is to store the diffracted neutrons at a certain angle with respect to the direction of the incident neutron beam in a selected channel of a 1024-multichannel analyzer for a certain preadjusted time period. AT the end of this time period the unit rotates the spectrometer's arm to another angle, selects the next channel of the MCA and provides the measurement of the diffracted neutron for the same time period. Such a sequence is repeated automatically over all angles required for the neutron diffraction pattern of the sample under investigation. As a result, the stored information at the MCA provides the neutron diffraction pattern as a function of channel number, where each channel corresponds to a certain scattering angle. The stored distribution at MCA can be obtained through the analyzer read out unit. The designed automatic unit has the possibility of providing the neutron diffraction pattern using a 6-digit scaler and a printer.

  7. Chapter 8: Plasma operation and control

    Science.gov (United States)

    ITER Physics Expert Group on Disruptions, Control, Plasma, and MHD; ITER Physics Expert Group on Energetic Particles, Heating, Current and Drive; ITER Physics Expert Group on Diagnostics; ITER Physics Basis Editors

    1999-12-01

    Wall conditioning of fusion devices involves removal of desorbable hydrogen isotopes and impurities from interior device surfaces to permit reliable plasma operation. Techniques used in present devices include baking, metal film gettering, deposition of thin films of low-Z material, pulse discharge cleaning, glow discharge cleaning, radio frequency discharge cleaning, and in situ limiter and divertor pumping. Although wall conditioning techniques have become increasingly sophisticated, a reactor scale facility will involve significant new challenges, including the development of techniques applicable in the presence of a magnetic field and of methods for efficient removal of tritium incorporated into co-deposited layers on plasma facing components and their support structures. The current status of various approaches is reviewed, and the implications for reactor scale devices are summarized. Creation and magnetic control of shaped and vertically unstable elongated plasmas have been mastered in many present tokamaks. The physics of equilibrium control for reactor scale plasmas will rely on the same principles, but will face additional challenges, exemplified by the ITER/FDR design. The absolute positioning of outermost flux surface and divertor strike points will have to be precise and reliable in view of the high heat fluxes at the separatrix. Long pulses will require minimal control actions, to reduce accumulation of AC losses in superconducting PF and TF coils. To this end, more complex feedback controllers are envisaged, and the experimental validation of the plasma equilibrium response models on which such controllers are designed is encouraging. Present simulation codes provide an adequate platform on which equilibrium response techniques can be validated. Burning plasmas require kinetic control in addition to traditional magnetic shape and position control. Kinetic control refers to measures controlling density, rotation and temperature in the plasma core as

  8. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Science.gov (United States)

    2012-10-12

    ... Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units Operating on the U.S. Outer... ``Mobile Offshore Drilling Unit Dynamic Positioning Guidance''. The notice recommended owners and operators of Mobile Offshore Drilling Units (MODUs) follow Marine Technology Society (MTS) Dynamic Positioning...

  9. Baseline groundwater model update for p-area groundwater operable unit, NBN

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States); Amidon, M. [Savannah River Site (SRS), Aiken, SC (United States)

    2015-09-01

    This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

  10. Smart house-based optimal operation of thermal unit commitment for a smart grid considering transmission constraints

    Science.gov (United States)

    Howlader, Harun Or Rashid; Matayoshi, Hidehito; Noorzad, Ahmad Samim; Muarapaz, Cirio Celestino; Senjyu, Tomonobu

    2018-05-01

    This paper presents a smart house-based power system for thermal unit commitment programme. The proposed power system consists of smart houses, renewable energy plants and conventional thermal units. The transmission constraints are considered for the proposed system. The generated power of the large capacity renewable energy plant leads to the violated transmission constraints in the thermal unit commitment programme, therefore, the transmission constraint should be considered. This paper focuses on the optimal operation of the thermal units incorporated with controllable loads such as Electrical Vehicle and Heat Pump water heater of the smart houses. The proposed method is compared with the power flow in thermal units operation without controllable loads and the optimal operation without the transmission constraints. Simulation results show the validation of the proposed method.

  11. Operating large controlled thermonuclear fusion research facilities

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Tarrh, J.M.; Post, R.S.; Thomas, P.

    1987-01-01

    The MIT Tara Tandem Mirror is a large, state of the art controlled thermonuclear fusion research facility. Over the six years of its design, implementation, and operation, every effort was made to minimize cost and maximize performance by using the best and latest hardware, software, and scientific and operational techniques. After reviewing all major DOE fusion facilities, an independent DOE review committee concluded that the Tara operation was the most automated and efficient of all DOE facilities. This paper includes a review of the key elements of the Tara design, construction, operation, management, physics milestones, and funding that led to this success. The authors emphasize a chronological description of how the system evolved from the proposal stage to a mature device with an emphasis on the basic philosophies behind the implementation process. This description can serve both as a qualitative and quantitative database for future large experiment planning. It includes actual final costs and manpower spent as well as actual run and maintenance schedules, number of data shots, major system failures, etc. The paper concludes with recommendations for the next generation of facilities

  12. Human reliability analysis of control room operators

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Isaac J.A.L.; Carvalho, Paulo Victor R.; Grecco, Claudio H.S. [Instituto de Engenharia Nuclear (IEN), Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Human reliability is the probability that a person correctly performs some system required action in a required time period and performs no extraneous action that can degrade the system Human reliability analysis (HRA) is the analysis, prediction and evaluation of work-oriented human performance using some indices as human error likelihood and probability of task accomplishment. Significant progress has been made in the HRA field during the last years, mainly in nuclear area. Some first-generation HRA methods were developed, as THERP (Technique for human error rate prediction). Now, an array of called second-generation methods are emerging as alternatives, for instance ATHEANA (A Technique for human event analysis). The ergonomics approach has as tool the ergonomic work analysis. It focus on the study of operator's activities in physical and mental form, considering at the same time the observed characteristics of operator and the elements of the work environment as they are presented to and perceived by the operators. The aim of this paper is to propose a methodology to analyze the human reliability of the operators of industrial plant control room, using a framework that includes the approach used by ATHEANA, THERP and the work ergonomics analysis. (author)

  13. Operating large controlled thermonuclear fusion research facilities

    International Nuclear Information System (INIS)

    Gaudreau, M.P.J.; Tarrh, J.M.; Post, R.S.; Thomas, P.

    1987-10-01

    The MIT Tara Tandem Mirror is a large, state of the art controlled thermonuclear fusion research facility. Over the six years of its design, implementation, and operation, every effort was made to minimize cost and maximize performance by using the best and latest hardware, software, and scientific and operational techniques. After reviewing all major DOE fusion facilities, an independent DOE review committee concluded that the Tara operation was the most automated and efficient of all DOE facilities. This paper includes a review of the key elements of the Tara design, construction, operation, management, physics milestones, and funding that led to this success. We emphasize a chronological description of how the system evolved from the proposal stage to a mature device with an emphasis on the basic philosophies behind the implementation process. This description can serve both as a qualitative and quantitative database for future large experiment planning. It includes actual final costs and manpower spent as well as actual run and maintenance schedules, number of data shots, major system failures, etc. The paper concludes with recommendations for the next generation of facilities. 13 refs., 15 figs., 3 tabs

  14. Improved control system power unit for large parachutes

    Science.gov (United States)

    Chandler, J. A.; Grubbs, T. M.

    1968-01-01

    Improved control system power unit drives the control surfaces of very large controllable parachutes. The design features subassemblies for determining control surface position and cable loading, and protection of the load sensor against the possibility of damage during manipulation.

  15. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  16. 14 CFR 91.1013 - Operational control briefing and acknowledgment.

    Science.gov (United States)

    2010-01-01

    ... Ownership Operations Operational Control § 91.1013 Operational control briefing and acknowledgment. (a) Upon...) Liability risk in the event of a flight-related occurrence that causes personal injury or property damage...

  17. Ageing Management of the reactor internals in Belgian nuclear units in view of Long Term Operation

    International Nuclear Information System (INIS)

    Gerard, R.; Bertolis, D.; Vissers, S.

    2012-01-01

    The reactor internals support the reactor core, distribute the coolant flow through the core, and guide and protect the rod control cluster assemblies and in-core instrumentation. Their integrity must be guaranteed in all operating and accident conditions. They are exposed to specific degradation mechanisms linked to the intense neutron irradiation, like Irradiation Assisted Stress Corrosion Cracking (IASCC) or potentially void swelling, in addition to more classical mechanisms like fatigue, wear and stress corrosion cracking. A rigorous follow-up of in-service degradation and an effective ageing management is therefore of crucial importance and contributes to the safe and economical operation of nuclear PWR units. (author)

  18. Operating System For Numerically Controlled Milling Machine

    Science.gov (United States)

    Ray, R. B.

    1992-01-01

    OPMILL program is operating system for Kearney and Trecker milling machine providing fast easy way to program manufacture of machine parts with IBM-compatible personal computer. Gives machinist "equation plotter" feature, which plots equations that define movements and converts equations to milling-machine-controlling program moving cutter along defined path. System includes tool-manager software handling up to 25 tools and automatically adjusts to account for each tool. Developed on IBM PS/2 computer running DOS 3.3 with 1 MB of random-access memory.

  19. Radioprotection in the operation of accelerator and plasma units

    International Nuclear Information System (INIS)

    Ewen, K.

    1984-01-01

    Relatively great problems of radioprotection can be caused by accelerator units, above all in the field of science, because all kinds of ionizing radiation and radioactive substances can be produced in all stages of aggregation. Furthermore, activities with relatively long half-lifes are induced by high particle streams with energies beyond the thresholds of many nuclear reations, to that the conditions of a control zone, even of a prohibited zone exist at many points after having switched off the accelerator. Not all of these radioprotective problems can be solved by constructive or technical measures. A sufficient skill of the persons responsible for radioprotection is very important in this connection. Efficient radioprotective measures are only possible by a close cooperation between the radiation protection officer, the competent authority, and the expert. (orig.) [de

  20. Control system design specification of advanced spent fuel management process units

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, S. H.; Kim, S. H.; Yoon, J. S

    2003-06-01

    In this study, the design specifications of instrumentation and control system for advanced spent fuel management process units are presented. The advanced spent fuel management process consists of several process units such as slitting device, dry pulverizing/mixing device, metallizer, etc. In this study, the control and operation characteristics of the advanced spent fuel management mockup process devices and the process devices developed in 2001 and 2002 are analysed. Also, a integral processing system of the unit process control signals is proposed, which the operation efficiency is improved. And a redundant PLC control system is constructed which the reliability is improved. A control scheme is proposed for the time delayed systems compensating the control performance degradation caused by time delay. The control system design specification is presented for the advanced spent fuel management process units. This design specifications can be effectively used for the detail design of the advanced spent fuel management process.

  1. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  2. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Hong, Jaesic

    2016-11-15

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  3. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Science.gov (United States)

    Aguirre, Erik

    2018-01-01

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework. PMID:29382148

  4. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Hong, Jaesic

    2016-01-01

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  5. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Directory of Open Access Journals (Sweden)

    Peio Lopez-Iturri

    2018-01-01

    Full Text Available In the context of hospital management and operation, Intensive Care Units (ICU are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  6. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context.

    Science.gov (United States)

    Lopez-Iturri, Peio; Aguirre, Erik; Trigo, Jesús Daniel; Astrain, José Javier; Azpilicueta, Leyre; Serrano, Luis; Villadangos, Jesús; Falcone, Francisco

    2018-01-29

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  7. Improved operability of the CANDU 9 control centre

    International Nuclear Information System (INIS)

    Macbeth, M. J.; Webster, A.

    1996-01-01

    The next generation CANDU nuclear power plant being designed by AECL is the 900 MWe class CANDU 9 station. It is based upon the Darlington CANDU station design which is among the world leaders in capacity factor with low Operation, Maintenance and Administration (OM and A) costs. This Control Centre design includes the proven functionality of existing CANDU control centres (including the Wolsong 2,3, and 4 control centre improvements, such as the Emergency Core Cooling panels), the characteristics identified by systematic design with human factors analysis of operations requirements and the advanced features needed to improve station operability which is made possible by the application of new technology. The CANDU 9 Control Centre provides plant staff with an improved operability capability due to the combination of proveness, systematic design with human factors engineering and enhanced operating features. Significant features which contribute to this improved operability include: · Standard NSP, BOP and F/H panels with controls and indicators integrated by a standard display/presentation philosophy. · Common plant parameter signal database for extensive monitoring, checking, display and annunciation. · Powerful annunciation system allowing alarm filtering, prioritizing and interrogation to enhance staff recognition of events, plant state and required corrective procedural actions. · The use of an overview display to present immediate and uncomplicated plant status information to facilitate operator awareness of unit status in a highly readable and recognizable format. · Extensive cross checking of similar process parameters amongst themselves, with the counterpart safety system parameters and as well as with 'signature' values obtained from known steady state conditions. · Powerful calculation capabilities, using the plant wide database, providing immediate recognizable and readable and readable output data on plant state information and plant state change

  8. Main Control Room Upgrade for Kori Unit 1 in Korea

    International Nuclear Information System (INIS)

    Ha, Jae Taeg; Choi, Moon Jae

    2014-01-01

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles

  9. Main Control Room Upgrade for Kori Unit 1 in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Taeg; Choi, Moon Jae [KEPCO, Daejeon (Korea, Republic of)

    2014-08-15

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles.

  10. Automatic generation control with thyristor controlled series compensator including superconducting magnetic energy storage units

    Directory of Open Access Journals (Sweden)

    Saroj Padhan

    2014-09-01

    Full Text Available In the present work, an attempt has been made to understand the dynamic performance of Automatic Generation Control (AGC of multi-area multi-units thermal–thermal power system with the consideration of Reheat turbine, Generation Rate Constraint (GRC and Time delay. Initially, the gains of the fuzzy PID controller are optimized using Differential Evolution (DE algorithm. The superiority of DE is demonstrated by comparing the results with Genetic Algorithm (GA. After that performance of Thyristor Controlled Series Compensator (TCSC has been investigated. Further, a TCSC is placed in the tie-line and Superconducting Magnetic Energy Storage (SMES units are considered in both areas. Finally, sensitivity analysis is performed by varying the system parameters and operating load conditions from their nominal values. It is observed that the optimum gains of the proposed controller need not be reset even if the system is subjected to wide variation in loading condition and system parameters.

  11. Computer programme for operator support in primary frequency control of NPP Dukovany

    International Nuclear Information System (INIS)

    Kurka, J.; Petruzela, I.; Piroutek, Z.

    1996-01-01

    The computer programme for the control room operator support in the primary frequency control operation of the NPP Dukovany power unit is described. This operational mode has recently been implemented. Until now, the plant has been exclusively operated in the based-load mode at nominal power. The stability of the main unit parameters, unit power output and main steam header pressure, is the characteristic feature for this mode of operation of units with WWER 440 type of reactors. This does no more hold in the new mode in which these both principal parameters vary in dependency on the power network frequency changes. This fact, however, has an important impact on the activities of the control room operators. Therefore, to help them to adapt themselves easily and without unnecessary stresses to new conditions the regulatory body when licensing the new mode finally approved its implementation only if computerized operator support system would be installed in the control room. Such a computer program for the operator support has been recently developed in EGU Prague and has already been implemented into the unit information system on all four Dukovany units. (author). 3 refs, 7 figs

  12. Configuration management and change control at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Gheorghiu, Virgil

    1998-01-01

    Effective configuration management requires that: 1. the design basis of station structures, systems, equipment and components be maintained at all times; 2. only accurate and approved technical, operational and maintenance information is available for performance of station activities; 3. correct operating manuals, flowsheets, operating sequences, operating task and training manuals are prepared and maintained currently. Design Engineering at Cernavoda NPP is primarily the responsibility of the Engineering Services Department supported if necessary by the Technical Unit. The key elements needed to achieve excellence in design engineering support for station operation, including design process and implementation of modification are investigated by answering the questions: 1. What is the station expectation for design change control?; 2. How is this provided?. Concerning design, the following aspects are stressed: Detailed Design Development; Design Verification; Design Change Implementation. The present design process is auditable and well documented. It consists of detailed design development, and design output documents such as applicable drawings, procurement specifications, installation and test requirement and the results of design and safety reviews. The design change implementation does not proceed until an Inspection Test Plan has been developed and approved as required. (author)

  13. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  14. National Ignition Facility Control and Information System Operational Tools

    International Nuclear Information System (INIS)

    Marshall, C.D.; Beeler, R.G.; Bowers, G.A.; Carey, R.W.; Fisher, J.M.; Foxworthy, C.B.; Frazier, T.M.; Mathisen, D.G.; Lagin, L.J.; Rhodes, J.J.; Shaw, M.J.

    2009-01-01

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a ∼2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

  15. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  16. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  17. Process control upgrades yield huge operational improvements

    International Nuclear Information System (INIS)

    Fitzgerald, W.V.

    2001-01-01

    Most nuclear plants in North America were designed and built in the late 60 and 70. The regulatory nature of this industry over the years has made design changes at the plant level difficult, if not impossible, to implement. As a result, many plants in this world region have been getting by on technology that is over 40 years behind the times. What this translates into is that the plants have not been able to take advantage of the huge technology gains that have been made in process control during this period. As a result, most of these plants are much less efficient and productive than they could be. One particular area of the plant that is receiving a lot of attention is the feedwater heaters. These systems were put in place to improve efficiency, but most are not operating correctly. This paper will present a case study where one progressive mid-western utility decided that enough was enough and implemented a process control audit of their heater systems. The audit clearly pointed out the existing problems with the current process control system. It resulted in a proposal for the implementation of a state of the art, digital distributed process control system for the heaters along with a complete upgrade of the level controls and field devices that will stabilize heater levels, resulting in significant efficiency gains and lower maintenance bills. Overall the payback period for this investment should be less than 6 months and the plant is now looking for more opportunities that can provide even bigger gains. (author)

  18. Main problems experienced on diesel generators of French 900 MWe operating units

    Energy Technology Data Exchange (ETDEWEB)

    Dredemis, Geoffroy; Jude, Francois [Commissariat a l' Energie Atomique, centre d' Etudes Nucleaires de Fontenay-aux-Roses, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    Each unit of all the French nuclear power plant is equipped with two diesel emergency generator sets., For the totality of standards PWRs of 900 MWe, they are identical. We present in this communication the most significative failures met with diesel engines on operating units, such as rupture of fuel injection pipes, breaking of the connecting rods, and cylinder lubrication failures. All these incidents, which affected the emergency power sources of concerned units, had generic characteristics. In view of their potential consequences, it was proceeded in each case to an immediate control of the components concerned of all PWR 900 MWe diesel engines. At the same time, studies were started as to what modifications would permit to solve rapidly each one of the problems met with. (authors)

  19. Medicaid Fraud Control Units (MFCU) Annual Spending and Performance Statistics

    Data.gov (United States)

    U.S. Department of Health & Human Services — Medicaid Fraud Control Units (MFCU or Unit) investigate and prosecute Medicaid fraud as well as patient abuse and neglect in health care facilities. OIG certifies,...

  20. Turbogas control unit using a hydraulic interface; Control de una unidad turbogas usando una interfase hidraulica

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Palacios, Ignacio Ramon; Castelo Cuevas, Luis [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)]. E-mail: irrp@iie.org.mx; lcastelo@iie.org.mx; Escarcega Navarrete, Luis [Servi-Control Monterrey S.A. de C.V., Monterrey, Nuevo Leon (Mexico)]. E-mail: lescarcega@servicontrol.com

    2010-11-15

    This paper presents the design and implementation of the control system of the Turbo Generator Unit (TGU) GE 5001, placed in Laguna Chavez power generation facility in Gomez Palacio, Dgo., Mexico. This TGU had been operating with an old control system, back to the 70's. The positioning of the control valves was carried out using a complex electro-hydraulic system. For the modernization of the control system, we use latest PLC technology and a current to pressure converter to communicate the PLC with the hydraulic control valves. The new control system helped us to obtain a best response at the start and generation phases, as well as an increase in the availability of the unit. We show the old and the new control architectures besides plot results obtained at the different operation points. [Spanish] En este articulo se presenta la implementacion y diseno del sistema de control de una Unidad Turbogas (UTG) GE-5001 de la Central Turbogas Laguna Chavez de CFE ubicada en Gomez Palacio, Durango, la cual originalmente era controlada mediante un sistema de control con tecnologia de los anos 70's. El posicionamiento de las valvulas de control se realizaba mediante un sistema electro-hidraulico complejo. Para la modernizacion del sistema de control a uno con tecnologia de punta fue necesario utilizar una interfase hidraulica por medio de un convertidor de corriente/presion (I/P) para el posicionamiento de las valvulas originales. Con la modernizacion se mejoro la respuesta del control asi como el incremento de la disponibilidad de la unidad. Se presentan la arquitectura anterior y actual de sistema de control asi como graficas de los resultados obtenidos en diferentes puntos de operacion de la UTG.

  1. 100-HR-2 Operable Unit Focused Feasibility study report

    International Nuclear Information System (INIS)

    1995-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Feasibility Study (FS) includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study (FFS) was conducted for the 100-HR-2 Operable Unit (OU) at the Hanford Site in southeastern Washington. This FFS constitutes the Phase 3 portion of the FS process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The objective of this OU-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the seven IRM candidate sites associated with the 100-HR-2 OU. The IRM candidate waste sites identified in Table ES-1 are determined in the limited field investigation (DOE-RL 1994b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented. A summary for the 100-HR-2 IRM candidate waste site is as follows: none of the waste sites require additional alternative development. six of the seven waste sites directly plug into the waste site group alternatives. The site-specific detailed analysis is conducted, referencing the waste site group analysis as appropriate. A waste site detailed analysis summary is presented in Table ES-1.A comparative analysis of remedial alternatives is presented for each waste site. A summary of the comparative analysis is presented in Table ES-2

  2. Combined operation of AC and DC distribution system with distributed generation units

    International Nuclear Information System (INIS)

    Noroozian, R.; Abedi, M.; Gharehpetian, G.

    2010-01-01

    This paper presents a DC distribution system which has been supplied by external AC systems as well as local DG units in order to demonstrate an overall solution to power quality issue. In this paper, the proposed operation method is demonstrated by simulation of power transfer between external AC systems, DG units, AC and DC loads. The power flow control in DC distribution system has been achieved by network converters and DG converters. Also, the mathematical model of the network, DG and load converters are obtained by using the average technique, which allows converter systems accurately simulated and control strategies for this converters is achieved. A suitable control strategy for network converters has been proposed that involves DC voltage droop regulator and novel instantaneous power regulation scheme. Also, a novel control technique has been proposed for DG converters. In this paper, a novel control system based on stationary and synchronously rotating reference frame has been proposed for load converters for supplying AC loads connected to the DC bus by balanced voltages. The several case studies have been studied based on proposed methods. The simulation results show that DC distribution systems including DG units can improve the power quality at the point of common coupling (PCC) in the power distribution system or industrial power system. (authors)

  3. Smart Inverter Control and Operation for Distributed Energy Resources

    Science.gov (United States)

    Tazay, Ahmad F.

    the microgrid as well as solve specific issues of connecting the microgrid to the system. A detailed procedure for controlling VSC and designing an optimal operation of the controller is also covered in the first part of the dissertation. This section provides an optimal operation for controlling motor drive and demonstrates issues when motor load exists at an autonomous microgrid. It also provides a solution for specific issues at operating a microgrid at autonomous mode as well as improving the structural design for the grid-tied microgrid. The solution for autonomous microgrid includes changing the operational state of the switching pattern of the smart inverter to solve the issue of a common mode voltage (CMV) that appears across the motor load. It also solves the issue of power supplying to large loads, such as induction motors. The last section of the low-level section involves an improvement of the performance and operation of the PV charging station for a plug-in hybrid electric vehicle (PHEV) at grid-tied mode. This section provides a novel structure and smart controller for PV charging station using three-phase hybrid boost converter topology. It also provides a form of applications of a multifunction smart inverter using PV charging station. The second part of the research is focusing on improving the performance of the microgrid by integrating several smart inverters to form a microgrid. It investigates the issue of connecting DER units with the microgrid at real applications. One of the common issues of the microgrid is the circulating current which is caused by poor reactive power sharing accuracy. When more than two DER units are connected in parallel, a microgrid is forming be generating required power for the load. When the microgrid is operated at autonomous mode, all DER units participate in generating voltage and frequency as well as share the load's power. This section provides a smart and novel controlling technique to solve the issue of unequal

  4. 46 CFR 196.85-1 - Magazine operation and control.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Magazine operation and control. 196.85-1 Section 196.85... OPERATIONS Magazine Control § 196.85-1 Magazine operation and control. (a) Keys to magazine spaces and magazine chests shall be kept in the sole control or custody of the Master or one delegated qualified...

  5. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    drums and that of unit No. 3. Overhaul and inspection of new designs components, such as reactor internal pumps (RIPs), advanced type control rod drive mechanism (FMCRD) and large-capacity and high-efficiency turbine system, were conducted as planned, verifying their integrity after the commercial operation period. Operability during annual outage through ABWR-type main control room panels, which have a very new man-machine interface with touch-screen CRTs and flat displays, was also confirmed. In this paper, the commercial operation and annual outage experience of Kashiwazaki-Kariwa Nuclear Power Station units Nos. 6 and 7 are reported. (author)

  6. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    A wide range of manipulator systems has been developed to carry out remotely operated inspection, repair and maintenance tasks at the Magnox reactors in the United Kingdom. A key factor in the improvement of these systems in recent years has been the extensive use of computer graphics as a real-time aid to the manipulator operator. This is exemplified by the reactor pressure vessel inspection work at the Bradwell reactor which is described in detail. The graphics sub-system of the control system for the manipulator plays a unique and wide-ranging role. The 3D modelling and simulation capability of the IGRIP software has contributed to the conceptual design, detailed path planning, rehearsal support, public relations, real-time manipulator display, post inspection documentation and quality assurance. (UK)

  7. Process Control System of a 500-MW Unit of the Reftinskaya Local Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Grekhov, L. L.; Bilenko, V. A.; Derkach, N. N.; Galperina, A. I.; Strukov, A. P.

    2002-01-01

    The results of the installation of a process control system developed by the Interavtomatika Company (Moscow) for controlling a 500-MW pulverized coal power unit with the use of the Teleperm ME and OM650 equipment of the Siemens Company are described. The system provides a principally new level of automation and process control through monitors comparable with the operation of foreign counterparts with complete preservation of the domestic peripheral equipment. During the 4.5 years of operation of the process control system the intricate algorithms for control and data processing have proved their operational integrity

  8. 14 CFR 25.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 25.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Powerplant Controls and Accessories § 25.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  9. 14 CFR 29.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 29.1142... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Powerplant Controls and Accessories § 29.1142 Auxiliary power unit controls. Means must be provided on the flight deck for starting...

  10. Barriers to high conversion operations in an ebullated bed unit -- Relationship between sedimentation and operability

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, D. [Criterion Catalysts Company L.P., Houston, TX (United States)

    2000-07-01

    Ebullated-Bed (EB) catalytic processes are high temperature, high pressure residue hydrocrackers, which transform sour feeds into light, sweet products. EB processes typically involve one or more trains, with one, two, or three EB reactors in series. The key to operating any EB process is to control the 'sediment' which tends to increase with increasing level of conversion. Sediment problems are generally attributed to the catalyst. While this is true in some cases, there are certain problems that occur regardless of the catalyst used, whereas in some situations sediments from the EB process can actually be controlled by the catalyst. This paper describes two typical sedimentation patterns; one in which the sediment increases, and another in which sediment decreases as the EB products move through the recovery section. The benefits of sediment control are illustrated for the latter sedimentation pattern.

  11. Multiagent-based Distributed Control for Operation Cost Minimization of Droop Controlled DC Microgrid Using Incremental Cost Consensus

    DEFF Research Database (Denmark)

    Li, Chendan; Quintero, Juan Carlos Vasquez; Guerrero, Josep M.

    2015-01-01

    In this paper, a multiagent based distributed control is proposed for DC microgrid to minimize the operation cost. The power of each distributed generator (DG) is dispatched in a distributed manner in a multiagent system by means of voltage scheduling. Every DG unit is taken as an agent......, and they share the load corresponding to the operation cost of all the units in the system with only communication with direct neighbors through incremental cost consensus. The power regulation according to the power reference generated by consensus is implemented through voltage scheduling in local primary...... controllers. Simulation verification shows that total operation cost of the DC microgrid is successfully reduced though the proposed method....

  12. 40 CFR 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking...

    Science.gov (United States)

    2010-07-01

    ..., Catalytic Reforming Units, and Sulfur Recovery Units. (iii) The owner or operator shall install, operate... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and...

  13. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  14. 2016 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2017-10-01

    This publication highlights data collected by the 2016 NCFO. The Bureau of Transportation Statistics (BTS) conducted the NCFO from April through November 2016, collecting the operational characteristics of the 2015 calendar year ferry operations.

  15. New control and safety rod unit for the training reactor of the Dresden Technical University

    International Nuclear Information System (INIS)

    Adam, E.; Schab, J.; Knorr, J.

    1983-01-01

    The extension of the experimental training of students at the training reactor AKR of the Dresden Technical University requires the reconstruction of the reactor with a new control and safety rod unit. The specific conditions at the AKR led to a new variant. Results of preliminary experiments, design and mode of operation of the first unit as well as hitherto gained operation experiences are presented. (author)

  16. Operation of Beaver Valley Power Station, Unit 2, Docket No. 50-412, Beaver County, Pennsylvania

    International Nuclear Information System (INIS)

    1985-09-01

    The final environmental impact statement (EPA No. 850438F) assesses the effects of operating a pressurized water reactor in Pennsylvania on the south bank of the Ohio River, which would serve as the final heat sink for the cooling system. Operation of Unit 2 would add 836 MW of capacity and increase system reliability. The plant would employ 465 at an $18 million payroll. Facilities for the plant would take up 56 acres of agricultural land. The operation result in both water and noise pollution. There is only a small probability of impacts due to potential radiation exposure. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Regulations require the impact statement

  17. Real-Time Analysis of an Active Distribution Network - Coordinated Frequency Control for Islanding Operation

    DEFF Research Database (Denmark)

    Cha, Seung-Tae

    distribution networks makes it possible to operate the distribution networks independently which is called islanding operation. However, it is a challenge to ensure secure and reliable operation of the islanded system due to a num-ber of reasons, e.g. low inertia in the islanded system, intermittency of some...... of the DERs, etc. Particularly during islanding operation, with relatively few DG units, the frequency and voltage control of the islanded system is not straightforward. DG units, specially based on renewable energy sources (RESs), i.e. wind and solar, have an inter-mittent nature and intrinsic...... system (BESS) and two secondary frequency control scenarios with BESS and DG units. During the island-ing transition, the frequency is regulated by the fast-acting primary control of the BESS. The secondary control of the main management system (MMS) detects the status of the BESS and tries to return...

  18. Unit information system operational displays for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Anikanov, S.S.; Carrera, J.P.; Gordon, P.

    1997-01-01

    The role of high level operational displays is explained as well as the principles of the design of such displays. The tasks of WWER operating personnel are described and the support provided by operational displays is highlighted. The architecture of the displays is also dealt with. (A.K.)

  19. United States Military in Central Asia: Beyond Operation Enduring Freedom

    Science.gov (United States)

    2009-10-23

    Malinowski , advocacy director for Human Rights Watch, stated, “the United States is most effective in promoting liberty around the world when people...26 U.S. President, The National Security Strategy of the United States of America, page? 27 Thomas Malinowski , “Testimony

  20. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  1. Operative training in otolaryngology in the United Kingdom: a specialist registrar survey

    NARCIS (Netherlands)

    Georgalas, Christos; Hadjihannas, Edward; Ghufoor, Khalid; Pracy, Paul; Papesch, Michael

    2005-01-01

    OBJECTIVE: To assess the current status of operative training for otolaryngology specialist registrars in the United Kingdom. DESIGN: Web-based questionnaire survey. PARTICIPANTS: All otolaryngology specialist registrars in the United Kingdom. MAIN OUTCOME MEASURES: The overall satisfaction with

  2. Design description of a microprocessor based Engine Monitoring and Control unit (EMAC) for small turboshaft

    Science.gov (United States)

    Baez, A. N.

    1985-01-01

    Research programs have demonstrated that digital electronic controls are more suitable for advanced aircraft/rotorcraft turbine engine systems than hydromechanical controls. Commercially available microprocessors are believed to have the speed and computational capability required for implementing advanced digital control algorithms. Thus, it is desirable to demonstrate that off-the-shelf microprocessors are indeed capable of performing real time control of advanced gas turbine engines. The engine monitoring and control (EMAC) unit was designed and fabricated specifically to meet the requirements of an advanced gas turbine engine control system. The EMAC unit is fully operational in the Army/NASA small turboshaft engine digital research program.

  3. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  4. Development of the automatic control rod operation system for JOYO. Verification of automatic control rod operation guide system

    International Nuclear Information System (INIS)

    Terakado, Tsuguo; Suzuki, Shinya; Kawai, Masashi; Aoki, Hiroshi; Ohkubo, Toshiyuki

    1999-10-01

    The automatic control rod operation system was developed to control the JOYO reactor power automatically in all operation modes(critical approach, cooling system heat up, power ascent, power descent), development began in 1989. Prior to applying the system, verification tests of the automatic control rod operation guide system was conducted during 32nd duty cycles of JOYO' from Dec. 1997 to Feb. 1998. The automatic control rod operation guide system consists of the control rod operation guide function and the plant operation guide function. The control rod operation guide function provides information on control rod movement and position, while the plant operation guide function provide guidance for plant operations corresponding to reactor power changes(power ascent or power descent). Control rod insertion or withdrawing are predicted by fuzzy algorithms. (J.P.N.)

  5. Distributed Autonomous Control of Multiple Spacecraft During Close Proximity Operations

    National Research Council Canada - National Science Library

    McCamish, Shawn B

    2007-01-01

    This research contributes to multiple spacecraft control by developing an autonomous distributed control algorithm for close proximity operations of multiple spacecraft systems, including rendezvous...

  6. Recommended radiological controls for tritium operations

    International Nuclear Information System (INIS)

    Mansfield, G.

    1992-01-01

    This informal report presents recommendations for an adequate radiological protection program for tritium operations. Topics include hazards analysis, facility design, personnel protection equipment, training, operational procedures, radiation monitoring, to include surface and airborne tritium contamination, and program management

  7. Control room human engineering influences on operator performance

    International Nuclear Information System (INIS)

    Finlayson, F.C.

    1977-01-01

    Three general groups of factors influence operator performance in fulfilling their responsibilities in the control room: (1) control room and control system design, informational data displays (operator inputs) as well as control board design (for operator output); (2) operator characteristics, including those skills, mental, physical, and emotional qualities which are functions of operator selection, training, and motivation; (3) job performance guides, the prescribed operating procedures for normal and emergency operations. This paper presents some of the major results of an evaluation of the effect of human engineering on operator performance in the control room. Primary attention is given to discussion of control room and control system design influence on the operator. Brief observations on the influences of operator characteristics and job performance guides (operating procedures) on performance in the control room are also given. Under the objectives of the study, special emphasis was placed on the evaluation of the control room-operator relationships for severe emergency conditions in the power plant. Consequently, this presentation is restricted largely to material related to emergency conditions in the control room, though it is recognized that human engineering of control systems is of equal (or greater) importance for many other aspects of plant operation

  8. How Can the United States Army Improve Human Intelligence in Peace Operations?

    National Research Council Canada - National Science Library

    Wright, David

    2003-01-01

    .... These secondary collectors, such as the Military Police, Psychological Operations, Civil Affairs and Line Units conduct liaison with international and local police forces, host-government official...

  9. Operation and control software for APNEA

    Energy Technology Data Exchange (ETDEWEB)

    McClelland, J.H.; Storm, B.H. Jr.; Ahearn, J. [Lockheed-Martin Specialty Components, Largo, FL (United States)] [and others

    1997-11-01

    The human interface software for the Lockheed Martin Specialty Components (LMSC) Active/Passive Neutron Examination & Analysis System (APENA) provides a user friendly operating environment for the movement and analysis of waste drums. It is written in Microsoft Visual C++ on a Windows NT platform. Object oriented and multitasking techniques are used extensively to maximize the capability of the system. A waste drum is placed on a loading platform with a fork lift and then automatically moved into the APNEA chamber in preparation for analysis. A series of measurements is performed, controlled by menu commands to hardware components attached as peripheral devices, in order to create data files for analysis. The analysis routines use the files to identify the pertinent radioactive characteristics of the drum, including the type, location, and quantity of fissionable material. At the completion of the measurement process, the drum is automatically unloaded and the data are archived in preparation for storage as part of the drum`s data signature. 3 figs.

  10. Operation and control software for APNEA

    International Nuclear Information System (INIS)

    McClelland, J.H.; Storm, B.H. Jr.; Ahearn, J.

    1997-01-01

    The human interface software for the Lockheed Martin Specialty Components (LMSC) Active/Passive Neutron Examination ampersand Analysis System (APENA) provides a user friendly operating environment for the movement and analysis of waste drums. It is written in Microsoft Visual C++ on a Windows NT platform. Object oriented and multitasking techniques are used extensively to maximize the capability of the system. A waste drum is placed on a loading platform with a fork lift and then automatically moved into the APNEA chamber in preparation for analysis. A series of measurements is performed, controlled by menu commands to hardware components attached as peripheral devices, in order to create data files for analysis. The analysis routines use the files to identify the pertinent radioactive characteristics of the drum, including the type, location, and quantity of fissionable material. At the completion of the measurement process, the drum is automatically unloaded and the data are archived in preparation for storage as part of the drum's data signature. 3 figs

  11. An operating environment for control systems on transputer networks

    NARCIS (Netherlands)

    Tillema, H.G.; Schoute, Albert L.; Wijbrans, K.C.J.; Wijbrans, K.C.J.

    1991-01-01

    The article describes an operating environment for control systems. The environment contains the basic layers of a distributed operating system. The design of this operating environment is based on the requirements demanded by controllers which can be found in complex control systems. Due to the

  12. USE OF ELECTRONIC CASE HISTORIES IN OPERATION OF MEDICAL UNITS

    Directory of Open Access Journals (Sweden)

    I. B. Boltenkova

    2016-01-01

    Full Text Available Introduction of electronic case histories to medical units including TB units is one of the factors allowing enhancing quality of medical care provision. Use of the electronic case histories provides conditions for information transparency improvement in a medical unit: financial, statistic and medico-technological. Information contained in the electronic case history is important and required both for internal and external use. Use of electronic case histories contributes to reduction of labor costs of workers in medical units, provides fast access of medical personnel to information, formalizes data, provides preservation, invariance and reliability of the information entered into electronic case history during the whole period of storage, regulates the access rights and confidentiality, personifies data and allows unifying health data of all Russian population into one pool.

  13. Design and operation of gas-heated thermal pumping units

    Energy Technology Data Exchange (ETDEWEB)

    Rostek, H A [Ruhrgas A.G., Essen (Germany, F.R.)

    1979-03-01

    The first gas heat pump systems have been operated since spring 1977. These are applied in living houses, school, swimming pools, and sport places and administration buildings. The heating performance of these systems is 150-3800 kW. Two of these systems, one in a swimming pool and one in a house for several families are operating, each of them for one heating period. The operational experiences with these gas heat pumps are reported on, basing on measurement results. The experience gathered from the operation of gas heat pumps systems is applied to the planning of other plants. The development of a standardized gas heat pump-series is emphasized.

  14. Quality and productivity drive innovation and improvement at United Technologies Aerospace Operations, Inc.

    Science.gov (United States)

    Jamar, L. G.

    1986-01-01

    Quality and innovation are the hallmarks of the national space program. In programs that preceded the Shuttle Program the emphasis was on meeting the risks and technical challenges of space with safety, quality, reliability, and success. At United Technologies Aerospace Operations, Inc. (UTAO), the battle has developed along four primary fronts. These fronts include programs to motivate and reward people, development and construction of optimized processes and facilities, implementation of specifically tailored management systems, and the application of appropriate measurement and control systems. Each of these initiatives is described. However, to put this quality and productivity program in perspective, UTAO and its role in the Shuttle Program are described first.

  15. Industrial hygiene and control technology assessment of ion implantation operations

    International Nuclear Information System (INIS)

    Ungers, L.J.; Jones, J.H.

    1986-01-01

    Ion implantation is a process used to create the functional units (pn junctions) of integrated circuits, photovoltaic (solar) cells and other semiconductor devices. During the process, ions of an impurity or a dopant material are created, accelerated and imbedded in wafers of silicon. Workers responsible for implantation equipment are believed to be at risk from exposure to both chemical (dopant compounds) and physical (ionizing radiation) agents. In an effort to characterize the chemical exposures, monitoring for chemical hazards was conducted near eleven ion implanters at three integrated circuit facilities, while ionizing radiation was monitored near four of these units at two of the facilities. The workplace monitoring suggests that ion implantation operators routinely are exposed to low-level concentrations of dopants. Although the exact nature of dopant compounds released to the work environment was not determined, area and personal samples taken during normal operating activities found concentrations of arsenic, boron and phosphorous below OSHA Permissible Exposure Limits (PELs) for related compounds; area samples collected during implanter maintenance activities suggest that a potential exists for more serious exposures. The results of badge dosimetry monitoring for ionizing radiation indicate that serious exposures are unlikely to occur while engineering controls remain intact. All emissions were detected at levels unlikely to result in exposures above the OSHA standard for the whole body (1.25 rems per calendar quarter). The success of existing controls in preventing worker exposures is discussed. Particular emphasis is given to the differential exposures likely to be experienced by operators and maintenance personnel.(ABSTRACT TRUNCATED AT 250 WORDS)

  16. Development and application of automatic frequency and power control systems for large power units

    Energy Technology Data Exchange (ETDEWEB)

    V.A. Bilenko; A.D. Melamed; E.E. Mikushevich; D.Y. Nikol' skii; R.L. Rogachev; N.A. Romanov [ZAO Interavtomatika (Interautomatika AG), Moscow (Russian Federation)

    2008-07-01

    We describe the results of work carried out at ZAO Interavtomatika on the development and putting into use of a system for automatically controlling the frequency and power output of large coal-fired power units involving the retrofitting of the turbine's hydraulic automatic control system. Certificates affirming conformity to the Standard of the System Operator Centralized Dispatching Administration (SO-CDA) have been received for eight power units as an outcome of these efforts.

  17. Application of fuzzy logic operation and control to BWRs

    International Nuclear Information System (INIS)

    Junichi Tanji; Mitsuo Kinoshita; Takaharu Fukuzaki; Yasuhiro Kobayashi

    1993-01-01

    Fuzzy logic control schemes employing linguistic decision rules for flexible operator control strategies have undergone application tests in dynamic systems. The advantages claimed for fuzzy logic control are its abilities: (a) to facilitate direct use of skillful operator know-how for automatic operation and control of the systems and (b) to provide robust multivariable control for complex plants. The authors have also studied applications of fuzzy logic control to automatic startup operations and load-following control in boiling water reactors, pursuing these same advantages

  18. Control units for the system of unified modules for multi-channel analysis (SUMMA)

    International Nuclear Information System (INIS)

    Bushnin, Yu.B.; Denisenko, A.A.; Dunajtsev, A.F.

    1975-01-01

    The control units of the ''SUMMA'' system unified modules for multichannel analysis are described; the system is used in the experimental physics installations of the Institute of High-Energy Physics for operation on-line with an electronic computer (e.c.). The units allow control of several crates of electronic equipment (up to seven) according to a program from the internal program units or from the e.c. to be assured. The organization of the control is similar to the organization of the CAMAC electronic system. Examples of communication between the system and an NR2100 electronic computer are presented

  19. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  20. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  1. Analysis of the operator's tasks: An aid to control room design

    International Nuclear Information System (INIS)

    Blanc, P.; Guesnier, G.P.; Heilbronn, B.; Monnier, B.

    1983-01-01

    The control room designer usually has no knowledge of the tasks performed by the operator in the control room since an overall picture of the situation only becomes available once the whole facility has been constructed. In order to study and design control rooms for its future PWR units, Electricite de France (EDF) felt it was essential to analyse these tasks: the work was facilitated by the existence of 900 MW PWR units which were already in operation and which are controlled in much the same manner as future units of the same type. Accordingly, by analysing the control procedures of these 900 MW PWR units, a data base describing the control and monitoring tasks performed by operators in normal, incident and accident situations has been built up. The data-base files, which were established from a study of 130 control procedures, record all the commands given and data available in the control room (about 7000), describe the tasks connected with these commands and data, and identify the times at which they are made use of by the operator. Using this data base, the principle of operator-system communication and of data processing in the control room of the future has been established: in such a control room, most controls and data will be accessible through computer communication systems to ensure that control and monitoring systems are closely integrated under normal operating conditions as well as in incident and post-accident situations and to enable the plant to be controlled by one or two operators in a seated position. (author)

  2. Flow-Control Unit For Nitrogen And Hydrogen Gases

    Science.gov (United States)

    Chang, B. J.; Novak, D. W.

    1990-01-01

    Gas-flow-control unit installed and removed as one piece replaces system that included nine separately serviced components. Unit controls and monitors flows of nitrogen and hydrogen gases. Designed for connection via fluid-interface manifold plate, reducing number of mechanical fluid-interface connections from 18 to 1. Unit provides increasing reliability, safety, and ease of maintenance, and for reducing weight, volume, and power consumption.

  3. Study on the power control system for NPP power unit with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Aleksandrova, N.D.; Naumov, A.V.

    1981-01-01

    Results of model investigations into basic version of the power control systems (PCS) conformably to the WWER-440 NPP power unit are stated. Transient processes in the power unit system when being two PCS versions during perturbations of different parameters: unit power, vapour pressure or position of control rods have been simulated. Investigations into the different PCS versions show that quality of operation of a traditional scheme with a turbine power controller and reactor pressure controller can be significantly improved with the introduction of a high-speed signal of pressure into the reactor controller. The PCS version with the compensation of interrelations between the turbine and reactor controllers constructed according to the same principles as the standard schemes of power units of thermal electric power plant is perspective as well [ru

  4. Development of a system for automatic control and performance evaluation of shutoff units in HANARO

    International Nuclear Information System (INIS)

    Jeong, Y. H.; Joe, Y. G.; Choi, Y. S.; Woo, J. S.

    2003-01-01

    The function of the shutoff units is to rapidly insert the shutoff rod into the reactor core for safe shutdown of reactor. This paper describes the development of a system for automatic control and performance evaluation of shutoff units. The system automatically drives the shutoff unit with a specified operation cycle and records the performance of the drive mechanism in graphs and data. Also, it records the operating parameters of the shutoff unit and test facility. The characteristic of the developed system was evaluated to compare with that being use in the HANARO reactor. The system will be used for the performance and endurance tests in the test facility. Hereafter, the system will efficiently be used for the normal operation and the periodical drop performance tests of shutoff units in HANARO

  5. Implementation of a digital feedwater control system at Dresden Nuclear Power Plant, Units 2 and 3: Final report

    International Nuclear Information System (INIS)

    Zapotocky, A.; Popovic, J.R.; Fournier, R.D.

    1988-12-01

    This report describes the Digital Feedwater Control System Implementation at the Dresden 2 or 3 Units of the BWR Nuclear Power Plant owned by the Commonwealth Edison Company. The digital system has been operational in Unit 3 since August 1986, and in Unit 2 since April 1987. The Bailey Control's Network 90 based digital control system replaced the obsolete GE/MAC 5000 analog control system in the reactor feedwater control loop as a ''like-for-like'' replacement. Operational experience from the Digital Feedwater Control installations has been good and the system demonstrated better performance than the old analog systems. 14 refs., 15 figs., 17 tabs

  6. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  7. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  8. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  9. Information Operations: Countering the Asymmetric Threat to the United States

    National Research Council Canada - National Science Library

    McKeown, Wendell

    1999-01-01

    .... The cornerstone of Joint Vision 2010 is information superiority. Every facet of future military operations will be critically linked to an aggregate cyber network that relies on critical national infrastructures to provide for information superiority...

  10. An Examination of the United States Air Service's Logistics Operations

    National Research Council Canada - National Science Library

    Hunt, Andrew

    1998-01-01

    This historical study details the U.S. Air Service's logistics operations at home and abroad in an attempt to determine the relationship between the process and more recently established logistic principles...

  11. Distributed model based control of multi unit evaporation systems

    International Nuclear Information System (INIS)

    Yudi Samyudia

    2006-01-01

    In this paper, we present a new approach to the analysis and design of distributed control systems for multi-unit plants. The approach is established after treating the effect of recycled dynamics as a gap metric uncertainty from which a distributed controller can be designed sequentially for each unit to tackle the uncertainty. We then use a single effect multi-unit evaporation system to illustrate how the proposed method is used to analyze different control strategies and to systematically achieve a better closed-loop performance using a distributed model-based controller

  12. 7 CFR 631.22 - Access to operating unit.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous § 631.22... unit for the purpose of ascertaining the accuracy of any representations made in a contract or leading up to a contract, and as to the performance of the terms and conditions of the contract. Access shall...

  13. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  14. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  15. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  16. Joint Forward Operating Base Elements of Command and Control

    National Research Council Canada - National Science Library

    Summers, William

    2002-01-01

    ... and its associated leadership, command of air assets at a joint forward operating base lacks guidance. Today, the United States prosecutes an air war over Afghanistan from bases in Uzbekistan, Pakistan, and Afghanistan...

  17. 47 CFR 90.473 - Operation of internal transmitter control systems through licensed fixed control points.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operation of internal transmitter control... Transmitter Control Internal Transmitter Control Systems § 90.473 Operation of internal transmitter control systems through licensed fixed control points. An internal transmitter control system may be operated...

  18. Universal power transistor base drive control unit

    Science.gov (United States)

    Gale, Allan R.; Gritter, David J.

    1988-01-01

    A saturation condition regulator system for a power transistor which achieves the regulation objectives of a Baker clamp but without dumping excess base drive current into the transistor output circuit. The base drive current of the transistor is sensed and used through an active feedback circuit to produce an error signal which modulates the base drive current through a linearly operating FET. The collector base voltage of the power transistor is independently monitored to develop a second error signal which is also used to regulate base drive current. The current-sensitive circuit operates as a limiter. In addition, a fail-safe timing circuit is disclosed which automatically resets to a turn OFF condition in the event the transistor does not turn ON within a predetermined time after the input signal transition.

  19. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  20. AN OPERATIONAL MANAGEMENT MODEL FOR A COAL MINING PRODUCTION UNIT

    Directory of Open Access Journals (Sweden)

    R. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: The coal mining industry faces increased pressure for higher quality coal at lower cost and increased volumes. To satisfy these requirements the industry needs technically skilled first line supervisors with operational management skills. Most first line supervisors possess the necessary technical, but not the required operational management skills. Various operational management philosophies, describing world-class operational management practices exist; however, it is not possible to implement these philosophies as-is in a mining environment due to the various differences between manufacturing and mining. The solution is to provide an operational management model, adapted from these philosophies, to first line supervisors in the coal mining industry.

    AFRIKAANSE OPSOMMING: Die steenkoolmynbedryf ervaar groeiende druk van die mark vir hoër gehalte steenkool, laer koste en verhoogde volumes. Om hierdie behoefte te bevredig benodig die myn tegniesgeskoolde eerstelyntoesighouers met bedryfsbestuursvaardighede. Ongelukkig beskik die meeste toesighouers wel oor die nodige tegniese kennis, maar nie die nodige bedryfsbestuursvaardighede nie. Daar bestaan verskeie bedryfsbestuursfilosofieë wat wêreldklas bedryfsbestuurspraktyke omskryf. Dit is egter nie moontlik om die filisofieë net so in die mynbedryf te implimenteer nie a.g.v. die verskille tussen vervaardiging en mynbou. Die oplossing is om ‘n bedryfsbestuurmodel wat op hierdie filosofieë geskoei is, aan eerstelyntoesighouers in die steenkoolbedryf te verskaf.

  1. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  2. Backstepping-based nonlinear adaptive control for coal-fired utility boiler-turbine units

    International Nuclear Information System (INIS)

    Fang, Fang; Wei, Le

    2011-01-01

    The control system of boiler-turbine unit plays an important role in improving efficiency and reducing emissions of power generation unit. The nonlinear, coupling and uncertainty of the unit caused by varying working conditions should be fully considered during the control system design. This paper presents an efficient control scheme based on backstepping theory for improving load adaptability of boiler-turbines in wide operation range. The design process of the scheme includes model preprocessing, control Lyapunov functions selection, interlaced computation of adaptive control laws, etc. For simplification and accuracy, differential of steam pipe inlet pressure and integral terms of target errors are adopted. Also, to enhance practicality, implementation steps of the scheme are proposed. A practical nonlinear model of a 500 MW coal-fired boiler-turbine unit is used to test the efficiency of the proposed scheme in different conditions.

  3. Inventory Control of Spare Parts for Operating Nuclear Power plants

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jong-Hyuck; Jang, Se-Jin; Hwang, Eui-Youp; Yoo, Sung-Soo; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    2006-07-01

    Inventory control of spare parts plays an increasingly important role in operation management. The trade-off is clear: on one hand a large number of spare parts ties up a large amount of capital, while on the other hand too little inventory may result in extremely costly emergency actions. This is why during the last few decades inventory of spare parts control has been the topics of many publications. Recently management systems such as manufacturing resources planning (MRP) and enterprise resource planning (ERP) have been added. However, most of these contributions have similar theoretical background. This means the concepts and techniques are mainly based on mathematical assumptions and modeling inventory of spare parts situations Nuclear utilities in Korea have several problems to manage the optimum level of spare parts though they used MRP System. Because most of items have long lead time and they are imported from United States, Canada, France and so on. In this paper, we will examine the available inventory optimization models which are applicable to nuclear power plant and then select optimum model and assumptions to make inventory of spare parts strategies. Then we develop the computer program to select and determine optimum level of spare parts which should be automatically controlled by KHNP ERP system. The main contribution of this paper is an inventory of spare parts control model development, which can be applied to nuclear power plants in Korea.

  4. Inventory Control of Spare Parts for Operating Nuclear Power plants

    International Nuclear Information System (INIS)

    Park, Jong-Hyuck; Jang, Se-Jin; Hwang, Eui-Youp; Yoo, Sung-Soo; Yoo, Keun-Bae; Lee, Sang-Guk; Hong, Sung-Yull

    2006-01-01

    Inventory control of spare parts plays an increasingly important role in operation management. The trade-off is clear: on one hand a large number of spare parts ties up a large amount of capital, while on the other hand too little inventory may result in extremely costly emergency actions. This is why during the last few decades inventory of spare parts control has been the topics of many publications. Recently management systems such as manufacturing resources planning (MRP) and enterprise resource planning (ERP) have been added. However, most of these contributions have similar theoretical background. This means the concepts and techniques are mainly based on mathematical assumptions and modeling inventory of spare parts situations Nuclear utilities in Korea have several problems to manage the optimum level of spare parts though they used MRP System. Because most of items have long lead time and they are imported from United States, Canada, France and so on. In this paper, we will examine the available inventory optimization models which are applicable to nuclear power plant and then select optimum model and assumptions to make inventory of spare parts strategies. Then we develop the computer program to select and determine optimum level of spare parts which should be automatically controlled by KHNP ERP system. The main contribution of this paper is an inventory of spare parts control model development, which can be applied to nuclear power plants in Korea

  5. Personal customizing exercise with a wearable measurement and control unit.

    Science.gov (United States)

    Wang, Zhihui; Kiryu, Tohru; Tamura, Naoki

    2005-06-28

    Recently, wearable technology has been used in various health-related fields to develop advanced monitoring solutions. However, the monitoring function alone cannot meet all the requirements of customizing machine-based exercise on an individual basis by relying on biosignal-based controls. We propose a new wearable unit design equipped with measurement and control functions to support the customization process. The wearable unit can measure the heart rate and electromyogram signals during exercise performance and output workload control commands to the exercise machines. The workload is continuously tracked with exercise programs set according to personally customized workload patterns and estimation results from the measured biosignals by a fuzzy control method. Exercise programs are adapted by relying on a computer workstation, which communicates with the wearable unit via wireless connections. A prototype of the wearable unit was tested together with an Internet-based cycle ergometer system to demonstrate that it is possible to customize exercise on an individual basis. We tested the wearable unit in nine people to assess its suitability to control cycle ergometer exercise. The results confirmed that the unit could successfully control the ergometer workload and continuously support gradual changes in physical activities. The design of wearable units equipped with measurement and control functions is an important step towards establishing a convenient and continuously supported wellness environment.

  6. Personal customizing exercise with a wearable measurement and control unit

    Directory of Open Access Journals (Sweden)

    Tamura Naoki

    2005-06-01

    Full Text Available Abstract Background Recently, wearable technology has been used in various health-related fields to develop advanced monitoring solutions. However, the monitoring function alone cannot meet all the requirements of customizing machine-based exercise on an individual basis by relying on biosignal-based controls. We propose a new wearable unit design equipped with measurement and control functions to support the customization process. Methods The wearable unit can measure the heart rate and electromyogram signals during exercise performance and output workload control commands to the exercise machines. The workload is continuously tracked with exercise programs set according to personally customized workload patterns and estimation results from the measured biosignals by a fuzzy control method. Exercise programs are adapted by relying on a computer workstation, which communicates with the wearable unit via wireless connections. A prototype of the wearable unit was tested together with an Internet-based cycle ergometer system to demonstrate that it is possible to customize exercise on an individual basis. Results We tested the wearable unit in nine people to assess its suitability to control cycle ergometer exercise. The results confirmed that the unit could successfully control the ergometer workload and continuously support gradual changes in physical activities. Conclusion The design of wearable units equipped with measurement and control functions is an important step towards establishing a convenient and continuously supported wellness environment.

  7. AUTOMATION OF OPERATIONAL CONTROL OF DATA FLOWS OF THE METALLURGICAL ENTERPRISE ORGANIZATIONAL STRUCTURE

    Directory of Open Access Journals (Sweden)

    A. N. Chichko

    2006-01-01

    Full Text Available New method for creation of models of operative control of enterprise is offered. The computer variant of the organizational structure, based on analysis of the charging dynamics of control units, is offered and illustrated at the example of one of organizational structures of Belorussian metallurgical works.

  8. Administrative arrangement between the United States Nuclear Regulatory Commission and the Atomic Energy Control Board of Canada for co-operation and the exchange of information in nuclear regulatory matters

    International Nuclear Information System (INIS)

    1989-06-01

    This Administrative Arrangement covers co-operation and exchange of technical information relating to the regulation of the health, safety, security, safeguards and environmental protection aspects of nuclear facilities and materials as well as of radioactive substances and waste. The Arrangement was concluded for five years and is renewable [fr

  9. Operational challenges and opportunities in pastured poultry operations in the United States.

    Science.gov (United States)

    Elkhoraibi, C; Pitesky, M; Dailey, N; Niemeier, D

    2017-06-01

    As pastured poultry production has gained increased popularity in the United States in recent years, there is a growing need for research and outreach efforts aimed at this sector of poultry production. In order to get familiarized with American pastured poultry producers, we conducted an online questionnaire aimed primarily at evaluating what operational challenges are faced by producers and what educational opportunities should be initiated by researchers. Results showed that pastured poultry farms largely vary in total number of acres farmed and total number of birds kept. The vast majority of farms (96%) rotate their flocks on pasture and include livestock species (78%) in their rotation systems. Mobile coops are the preferred housing option provided by producers (88%). The most common source of mortality listed by respondents was predation (52%), followed by "other" (32%). However, predation was not selected as the most important challenge by the majority of respondents. Sixty-four percent of participants instead mentioned providing adequate feed at reasonable cost as the major challenge in raising poultry on pasture, followed again by "other" (52%) and lack of processing facilities for small numbers of birds (40%). Finally, the topics considered by respondents as the most helpful to learn more about were how to improve egg production rate and/or feed conversion ratio (67%), followed by how to improve pasture condition and optimum vegetative cover all year round (62%). Despite its small sample size, this study's results provide some valuable insights of challenges encountered and information needed on pastured poultry farms. © 2017 Poultry Science Association Inc.

  10. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electric power generated in 1975 was 1,074,401 MW(e) with the generator on line 4,680.7 hrs. Information is presented concerning operations, maintenance, radioactive effluents and waste shipments, health physics, shutdowns, and personnel exposures

  11. Startup operation of Browns Ferry's 1152-MW nuclear units

    International Nuclear Information System (INIS)

    Calhoun, J.R.; Green, H.J.; Beers, R.B.

    1975-01-01

    An overview is presented of startup operation for the Browns Ferry-1 reactor, and comparisons are made with the startup of Browns Ferry-2. Included are comments on the selection of the BWR type steam supply system, reactor fueling, problems encountered, and plant availability

  12. Brunswick Steam Electric Plant, Unit 2. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Initial criticality occurred in March and start-up testing continued for most of the year. Information is presented concerning operations, shutdowns, maintenance, design changes, personnel radiation exposures, thermal transients, safety/relief valve malfunctions, condenser tube leaks, and recirculation pump seal failures

  13. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  14. Off-Policy Reinforcement Learning: Optimal Operational Control for Two-Time-Scale Industrial Processes.

    Science.gov (United States)

    Li, Jinna; Kiumarsi, Bahare; Chai, Tianyou; Lewis, Frank L; Fan, Jialu

    2017-12-01

    Industrial flow lines are composed of unit processes operating on a fast time scale and performance measurements known as operational indices measured at a slower time scale. This paper presents a model-free optimal solution to a class of two time-scale industrial processes using off-policy reinforcement learning (RL). First, the lower-layer unit process control loop with a fast sampling period and the upper-layer operational index dynamics at a slow time scale are modeled. Second, a general optimal operational control problem is formulated to optimally prescribe the set-points for the unit industrial process. Then, a zero-sum game off-policy RL algorithm is developed to find the optimal set-points by using data measured in real-time. Finally, a simulation experiment is employed for an industrial flotation process to show the effectiveness of the proposed method.

  15. Standard formatted data units-control authority procedures

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to establish a set of minimum and optional requirements for the implementation of Control Authority (CA) organizations within and among the Agencies participating in the Consultative Committee for Space Data Systems (CCSDS). By satisfying these requirements, the resultant cooperating set of CA organizations will produce a global CA service supporting information transfer with digital data under the Standard Formatted Data Unit (SFDU) concept. This service is primarily accomplished through the registration, permanent archiving, and dissemination of metadata in the form of Metadata Objects (MDO) that assist in the interpretation of data objects received in SFDU form. This Recommendation addresses the responsibilities, services, and interface protocols for a hierarchy of CA organizations. The top level, consisting of the CCSDS Secretariat and its operational agent, is unique and primarily provides a global coordination function. The lower levels are Agency CA organizations that have primary responsibility for the registration, archiving, and dissemination of MDOs. As experience is gained and technology evolves, the CA Procedures will be extended to include enhanced services and their supporting protocols. In particular, it is anticipated that eventually CA organizations will be linked via networks on a global basis, and will provide requestors with online automated access to CA services. While this Recommendation does not preclude such operations, it also does not recommend the specific protocols to be used to ensure global compatibility of these services. These recommendations will be generated as experience is gained.

  16. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of performance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays) and the human operator. In the remote control engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  17. Elements of an advanced integrated operator control station

    International Nuclear Information System (INIS)

    Clarke, M.M.; Kreifeldt, J.G.

    1984-01-01

    One of the critical determinants of peformance for any remotely operated maintenance system is the compatibility achieved between elements of the man/machine interface (e.g., master manipulator controller, controls, displays, etc.) and the human operator. In the Remote Control Engineering task of the Consolidated Fuel Reprocessing Program, considerable attention has been devoted to optimizing the man/machine interface of the operator control station. This system must be considered an integral element of the overall maintenance work system which includes transporters, manipulators, remote viewing, and other parts. The control station must reflect the integration of the operator team, control/display panels, manipulator master controllers, and remote viewing monitors. Human factors principles and experimentation have been used in the development of an advanced integrated operator control station designed for the advance servomanipulator. Key features of this next-generation design are summarized in this presentation. 7 references, 4 figures

  18. Contamination control plan for prelaunch operations

    Science.gov (United States)

    Austin, J. D.

    1983-01-01

    A unified, systematic plan is presented for contamination control for space flight systems. Allowable contaminant quantities, or contamination budgets, are determined based on system performance margins and system-level allowable degradations. These contamination budgets are compared to contamination rates in ground environments to establish the controls required in each ground environment. The use of feedback from contamination monitoring and some contamination control procedures are discussed.

  19. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    International Nuclear Information System (INIS)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea

    2014-01-01

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators

  20. Operational Strategy of CBPs for load balancing of Operators in Advanced Main Control Room

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seunghwan; Kim, Yochan; Jung, Wondea [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    With the using of a computer-based control room in an APR1400 (Advanced Pressurized Reactor-1400), the operators' behaviors in the main control room had changed. However, though the working environment of operators has been changed a great deal, digitalized interfaces can also change the cognitive tasks or activities of operators. First, a shift supervisor (SS) can confirm/check the conduction of the procedures and the execution of actions of board operators (BOs) while confirming directly the operation variables without relying on the BOs. Second, all operators added to their work the use of a new CBP and Soft Controls, increasing their procedural workload. New operational control strategies of CBPs are necessary for load balancing of operator's task load in APR1400. In this paper, we compared the workloads of operators in an APR1400 who work with two different usages of the CBP. They are SS oriented usage and SS-BO collaborative usage. In this research, we evaluated the workloads of operators in an advanced main control room by the COCOA method. Two types of CBP usages were defined and the effects of these usages on the workloads were investigated. The obtained results showed that the workloads between operators in a control room can be balanced according to the CBP usages by assigning control authority to the operators.

  1. Cognitive model of the power unit operator activity

    International Nuclear Information System (INIS)

    Chachko, S.A.

    1992-01-01

    Basic notions making it possible to study and simulate the peculiarities of man-operator activity, in particular his way of thiking, are considered. Special attention is paid to cognitive models based on concept of decisive role of knowledge (its acquisition, storage and application) in the man mental processes and activity. The models are based on three basic notions, which are the professional world image, activity strategy and spontaneous decisions

  2. Operations Research and the US (United States) Army

    Science.gov (United States)

    1983-04-07

    technology "developed more rapidly than it could be absorbed effectively into military tactics and strategy." 4 World War II is usually identified as...Corporation, was formed by the Air Force as a non-profit organization to provide technological advice. 7 By the early 1950’s the public recognized operations... enlight - ening. He recognized the important and clearly distinguishable roles played by the technical analyst and the military decision maker. The systems

  3. The Effect of Operations Control on Reliability

    NARCIS (Netherlands)

    Van Oort, N.; Van Nes, R.

    2010-01-01

    Zoetermeer in The Netherlands. During peak hours the frequency on some trajectories is about 24 vehicles an hour. Dealing with these high frequencies and offering travelers a high quality product, according to waiting times as well as the probability of getting a seat, the operator designed a three

  4. Enhanced Engine Control for Emergency Operation

    Science.gov (United States)

    Litt, Jonathan S.

    2012-01-01

    C-MAPSS40k engine simulation has been developed and is available to the public. The authenticity of the engine performance and controller enabled the development of realistic enhanced control modes through controller modification alone. Use of enhanced control modes improved stability and control of an impaired aircraft. - Fast Response is useful for manual manipulation of the throttles - Use of Fast Response improved stability as part of a yaw rate feedback system. - Use of Overthrust shortened takeoff distance, but was generally useful in flight, too. Initial lack of pilot familiarity resulted in discomfort, especially with yaw rate feedback, but that was the only drawback, overall the pilot found the enhanced modes very helpful.

  5. Cost and Operational Effectiveness Analysis of Aiternative Force Structures for Fulfillment of the United States Marine Corps Operational Support Airlift and Search and Rescue Missions

    National Research Council Canada - National Science Library

    Chase, Eric

    2000-01-01

    This thesis provides a preliminary cost and operational effectiveness analysis of alternative force structures for the United States Marine Corps operational support airlift and search and rescue missions...

  6. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  7. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  8. Belt conveyor dynamics in transient operation for speed control

    OpenAIRE

    He, D.; Pang, Y.; Lodewijks, G.

    2016-01-01

    Belt conveyors play an important role in continuous dry bulk material transport, especially at the mining industry. Speed control is expected to reduce the energy consumption of belt conveyors. Transient operation is the operation of increasing or decreasing conveyor speed for speed control. According to literature review, current research rarely takes the conveyor dynamics in transient operation into account. However, in belt conveyor speed control, the conveyor dynamic behaviors are signifi...

  9. Overview of the Habitat Demonstration Unit Power System Integration and Operation at Desert RATS 2010

    Science.gov (United States)

    Colozza, Anthony J.; George, Pat; Gambrell, Ronnie; Chapman, Chris

    2013-01-01

    A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.

  10. Development of control system in abdominal operating ROV

    OpenAIRE

    ZHANG Weikang; WANG Guanxue; XU Guohua; LIU Chang; SHEN Xiong

    2017-01-01

    In order to satisfy all the requirements of Unmanned Underwater Vehicle(UUV)recovery tasks, a new type of abdominal operating Remote Operated Vehicle(ROV) was developed. The abdominal operating ROV is different from the general ROV which works by a manipulator, as it completes the docking and recovery tasks of UUVs with its abdominal operating mechanism. In this paper, the system composition and principles of the abdominal operating ROV are presented. We then propose a framework for a control...

  11. Implementation of an operator model with error mechanisms for nuclear power plant control room operation

    International Nuclear Information System (INIS)

    Suh, Sang Moon; Cheon, Se Woo; Lee, Yong Hee; Lee, Jung Woon; Park, Young Taek

    1996-01-01

    SACOM(Simulation Analyser with Cognitive Operator Model) is being developed at Korea Atomic Energy Research Institute to simulate human operator's cognitive characteristics during the emergency situations of nuclear power plans. An operator model with error mechanisms has been developed and combined into SACOM to simulate human operator's cognitive information process based on the Rasmussen's decision ladder model. The operational logic for five different cognitive activities (Agents), operator's attentional control (Controller), short-term memory (Blackboard), and long-term memory (Knowledge Base) have been developed and implemented on blackboard architecture. A trial simulation with a scenario for emergency operation has been performed to verify the operational logic. It was found that the operator model with error mechanisms is suitable for the simulation of operator's cognitive behavior in emergency situation

  12. Visual operations control in administrative environments

    Energy Technology Data Exchange (ETDEWEB)

    Carson, M.L.; Levine, L.O.

    1995-03-01

    When asked what comes to mind when they think of ``controlling work`` in the office, people may respond with ``overbearing boss,`` ``no autonomy,`` or ``Theory X management.`` The idea of controlling work in white collar or administrative environments can have a negative connotation. However, office life is often chaotic and miserable precisely because the work processes are out of control, and managers must spend their time looking over people`s shoulders and fighting fires. While management styles and structures vary, the need for control of work processes does not. Workers in many environments are being reorganized into self-managed work teams. These teams are expected to manage their own work through increased autonomy and empowerment. However, even empowered work teams must manage their work processes because of process variation. The amount of incoming jobs vary with both expected (seasonal) and unexpected demand. The mixture of job types vary over time, changing the need for certain skills or knowledge. And illness and turnover affect the availability of workers with needed skills and knowledge. Clearly, there is still a need to control work, whether the authority for controlling work is vested in one person or many. Visual control concepts provide simple, inexpensive, and flexible mechanisms for managing processes in work teams and continuous improvement administrative environments.

  13. Operation of the radioactive acid-digestion test unit (RADTU)

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1981-01-01

    At the Karlsruhe Nuclear Research Center, research and development work concerned with the acid digestion of combustible waste with high plutonium content is being carried out. The main objectives are the reduction of the waste volume, the recovery of the plutonium and the transformation of the process residues into a product suitable for final disposal. For this purpose an inactive demonstration plant with a throughput of 1.5 kg/h has been constructed. In the first version, the reactor of this plant was a tray reactor of the HEDL type. During test operations the sedimentation of a residue was observed on the tray. The density of this residue was higher than that of the residue suspended in the reaction acid. Experiments using tantalum oxide (D=8.4 g/cm 3 ) to simulate the plutonium oxide (D=11.5 g/cm 3 ) have verified this observation. This means that in active operation a sedimentation of plutonium oxide on the tray is to be expected. With respect to these results a new reactor was developed where the settling of the residue is avoided by appropriate design and high circulation velocity of the reaction acid. The reactor consists of a tube 50-80 mm in diameter, which is curved to form a closed loop with an arm length of about 1x1 m. Since October 1979 this ring reactor has been under inactive test operation. Its behaviour is very stable. The velocity of the reaction acid in the heater is 0.5-1 m/s. A settling of residues or tantalum oxide has not been observed. The throughput attained is comparable to that of the tray reactor but the space requirement is three times smaller, and the volume of the reaction acid four times smaller. (author)

  14. Operators manual for a computer controlled impedance measurement system

    Science.gov (United States)

    Gordon, J.

    1987-02-01

    Operating instructions of a computer controlled impedance measurement system based in Hewlett Packard instrumentation are given. Hardware details, program listings, flowcharts and a practical application are included.

  15. United Kingdom: Procurement Related Nuclear Experience (Operating Experience)

    International Nuclear Information System (INIS)

    2016-01-01

    Procurement of nuclear facilities in the United Kingdom is subject to nuclear site licence conditions issued by the Government through the Office for Nuclear Regulation (ONR). Each nuclear facility in the United Kingdom must have a nuclear site licence and must comply with the 36 general conditions that are set out in the Licence Condition Handbook (October 2014). In addition, the ONR has published a technical assessment guide for the procurement of nuclear safety related items or services; a guide on intelligent customers and a guide on records management also apply to the procurement phase, and ONR interventions look across all three of these documents. Procurement governance arrangements need to be developed (including a policy, manual, procedures and template documents) and approved within the utility company. The ONR monitors the arrangements via interventions and deems the arrangements to be ‘adequate’. Some procurement contracts become lifetime records for nuclear safety related systems and need to be retained while the plant is in place. A formal record retention schedule needs to be created and managed by the procurement organization. The utility company may elect to set hold points during the various procurement stages and, importantly, obtain approval for the contract and its content from all technical stakeholders (with particular emphasis on the engineering, project management and design authority quality functions before contract award). For contracts with high nuclear safety significance, the ONR may enforce additional hold points before and/or after contract award. There is a general requirement that the utility puts in place adequate arrangements to ensure that suitably qualified and experienced personnel are employed to implement adequate management arrangements and to act as an intelligent customer. This includes being able to demonstrate that any contractor or supplier is suitable, capable and experienced, and has the necessary processes and

  16. [Controlling and operation management in hospitals].

    Science.gov (United States)

    Vagts, Dierk A

    2010-03-01

    The economical pressure on the health system and especially on hospitals is growing rapidly. Hence, economical knowledge for people in medical executive positions becomes imperative. In advanced and forward-looking hospitals controlling is gaining more and more weight, because it takes over a coordinative responsibility. Ideally controlling is navigating the teamwork of managers (CEOs) and medical executives by weighing medical necessities and economical framework. Controlling is contributing to evaluate an optimal efficiency of a hospital in a highly competitive surrounding by providing medical and economical data on a regular basis. A close, open-minded and trusting cooperation between all people, who are involved, is imperative. Hence, controlling in the proper meaning of the word can not flourish in dominant and hierarchic hospital structures. Georg Thieme Verlag Stuttgart * New York.

  17. Command and Control for Joint Air Operations

    Science.gov (United States)

    2010-01-12

    systems, to include collaborative air planning tools such as the theater battle management core system ( TBMCS ). Operational level air planning occurs in...sight communications and data exchange equipment in order to respond to joint force requirements. For example, the TBMCS is often used. The use of ATO...generation and dissemination software portions of TBMCS has been standardized. This ATO feature allows the JAOC to be interoperable with other

  18. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  19. Design of Air Traffic Control Operation System

    Directory of Open Access Journals (Sweden)

    Gabriela STROE

    2017-09-01

    Full Text Available This paper presents a numerical simulation for a different aircraft, based on the specific aircraft data that can be incorporated in the model and the equations of motions which can be consequently solved. The aircraft flight design involves various technical steps and requires the use of sophisticated software having modeling and simulation capabilities. Within the flight simulation model, the aerodynamic model can be regarded as the most complex and most important. With appropriate aerodynamic modeling the aerodynamic forces and moments acting on the aircraft's center of gravity can be numerically solved with accuracy. These forces and moments are further used to solve the equations of motion. The development of control and computing technology makes it possible for advanced flight control strategy. The advanced control techniques tend to make the control design and their implementation much more complicated with more control loops or channels; in this line, the autopilot of modern aircrafts includes a variety of automatic control systems that aid and support the flight navigation, flight management, and perform the enhancing and/or augmenting of the stability characteristics of the airplane. Therefore in this context it is very important to choose the dynamic that will satisfy the performance and robustness specifications.

  20. Analysis of the Capabilities Supporting Humanitarian Assistance and Disaster Relief Operations of the Indonesian Navy (TNI AL) and the United States Marine Corps Marine Expeditionary Unit (USMC MEU)

    Science.gov (United States)

    2015-12-01

    Operating Procedure SPMAGTF Special Purpose Marine Air Ground Task Force SSB Single Side Band STP Shock Trauma Platoon TACRON Tactical Air Control...Platoon ( STP ) that is capable of conducting emergency treatment and triage. The remaining corpsmen are dispersed throughout the individual sub-units of...Jane’s navigating the emerging markets , Indonesia. Retrieved from Jane’s Information Group https://janes.ihs.com.libproxy.nps.edu/CustomPages/Janes

  1. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  2. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  3. Assessment of the operating conditions of coordinated Q-V controller within secondary voltage control system

    Directory of Open Access Journals (Sweden)

    Arnautović Dušan

    2014-01-01

    Full Text Available The paper, discusses the possibility to use coordinated Q-V controller (CQVC to perform secondary voltage control at the power plant level. The CQVC performs the coordination of the synchronous generators' (SG reactive power outputs in order to maintain the same total reactive power delivered by the steam power plant (SPP, while at the same time maintaining a constant voltage with programmed reactive droop characteristic at the SPP HV busbar. This busbar is the natural pilot node for secondary voltage control at HV level as the node with maximum power production and maximum power consumption. In addition to voltage control, the CQVC maintains the uniform allocation of reactive power reserves at all SGs in the power plant. This is accomplished by setting the reactive power of each SG at given operating point in accordance to the available reactive power of the same SG at that point. Different limitations imposed by unit's and plant equipment are superimposed on original SG operating chart (provided by the manufacturer in order to establish realistic limits of SG operation at given operating point. The CQVC facilitates: i practical implementation of secondary voltage control in power system, as it is capable of ensuring delivery of reactive power as requested by regional/voltage control while maintaining voltage at system pilot node, ii the full deployment of available reactive power of SGs which in turn contributes to system stability, iii assessment of the reactive power impact/contribution of each generator in providing voltage control as ancillary service. Furthermore, it is also possible to use CQVC to pricing reactive power production cost at each SG involved and to design reactive power bidding structure for transmission network devices by using recorded data. Practical exploitation experience acquired during CQVC continuous operation for over two years enabled implementation of the optimal setting of reference voltage and droop on daily

  4. Hierarchical control of motor units in voluntary contractions.

    Science.gov (United States)

    De Luca, Carlo J; Contessa, Paola

    2012-01-01

    For the past five decades there has been wide acceptance of a relationship between the firing rate of motor units and the afterhyperpolarization of motoneurons. It has been promulgated that the higher-threshold, larger-soma, motoneurons fire faster than the lower-threshold, smaller-soma, motor units. This relationship was based on studies on anesthetized cats with electrically stimulated motoneurons. We questioned its applicability to motor unit control during voluntary contractions in humans. We found that during linearly force-increasing contractions, firing rates increased as exponential functions. At any time and force level, including at recruitment, the firing rate values were inversely related to the recruitment threshold of the motor unit. The time constants of the exponential functions were directly related to the recruitment threshold. From the Henneman size principle it follows that the characteristics of the firing rates are also related to the size of the soma. The "firing rate spectrum" presents a beautifully simple control scheme in which, at any given time or force, the firing rate value of earlier-recruited motor units is greater than that of later-recruited motor units. This hierarchical control scheme describes a mechanism that provides an effective economy of force generation for the earlier-recruited lower force-twitch motor units, and reduces the fatigue of later-recruited higher force-twitch motor units-both characteristics being well suited for generating and sustaining force during the fight-or-flight response.

  5. Supervisory Control and Diagnostics System Distributed Operating System

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1979-01-01

    This paper contains a description of the Supervisory Control and Diagnostics System (SCDS) Distributed Operating System. The SCDS consists of nine 32-bit minicomputers with shared memory. The system's main purpose is to control a large Mirror Fusion Test Facility

  6. Upgrading of Alum Preparation and Dosing Unit for Sharq Dijla Water Treatment Plant by Using Programmable Logic Controller System

    Directory of Open Access Journals (Sweden)

    Aumar Al-Nakeeb

    2018-02-01

    Full Text Available One of the important units in Sharq Dijla Water Treatment Plant (WTP first and second extensions are the alum solution preparation and dosing unit. The existing operation of this unit accomplished manually starting from unloading the powder alum in the preparation basin and ending by controlling the alum dosage addition through the dosing pumps to the flash mix chambers. Because of the modern trend of monitoring and control the automatic operation of WTPs due to the great benefits that could be gain from optimum equipment operation, reducing the operating costs and human errors. This study deals with how to transform the conventional operation to an automatic monitoring and controlling system depending on a Programmable Logic Controller (PLC and online sensors for alum preparation and dosing unit in Sharq Dijla WTP. PLC system will receive, analyze transmitting data, compare them with preset points then automatically orders the operational equipment (such as pumps, valves, and mixers in a way that guarantees the safe and appropriate operation of the unit. As a result of Process and Instrumentation Diagrams (PID that were prepared in this study, these units can be fully operating and manage by using Supervisory Control and Data Acquisition (SCADA system.

  7. Hospital markup and operation outcomes in the United States.

    Science.gov (United States)

    Gani, Faiz; Ejaz, Aslam; Makary, Martin A; Pawlik, Timothy M

    2016-07-01

    Although the price hospitals charge for operations has broad financial implications, hospital pricing is not subject to regulation. We sought to characterize national variation in hospital price markup for major cardiothoracic and gastrointestinal operations and to evaluate perioperative outcomes of hospitals relative to hospital price markup. All hospitals in which a patient underwent a cardiothoracic or gastrointestinal procedure were identified using the Nationwide Inpatient Sample for 2012. Markup ratios (ratio of charges to costs) for the total cost of hospitalization were compared across hospitals. Risk-adjusted morbidity, failure-to-rescue, and mortality were calculated using multivariable, hierarchical logistic regression. Among the 3,498 hospitals identified, markup ratios ranged from 0.5-12.2, with a median markup ratio of 2.8 (interquartile range 2.7-3.9). For the 888 hospitals with extreme markup (greatest markup ratio quartile: markup ratio >3.9), the median markup ratio was 4.9 (interquartile range 4.3-6.0), with 10% of these hospitals billing more than 7 times the Medicare-allowable costs (markup ratio ≥7.25). Extreme markup hospitals were more often large (46.3% vs 33.8%, P markup ratio compared with 19.3% (n = 452) and 6.8% (n = 35) of nonprofit and government hospitals, respectively. Perioperative morbidity (32.7% vs 26.4%, P markup hospitals. There is wide variation in hospital markup for cardiothoracic and gastrointestinal procedures, with approximately a quarter of hospital charges being 4 times greater than the actual cost of hospitalization. Hospitals with an extreme markup had greater perioperative morbidity. Copyright © 2016 Elsevier Inc. All rights reserved.

  8. Operation control equipment for BWR type reactor

    International Nuclear Information System (INIS)

    Izumi, Masayuki; Takeda, Renzo.

    1981-01-01

    Purpose: To improve the temperature balance in a feedwater heater by obtaining the objective value of a feedwater enthalpy upon calculation of respective measured values and controlling the opening or closing of an extraction valve so that the objective value may coincide with the measured value, thereby averaging the axial power distribution. Constitution: A plurality of stages of extraction lines are connected to a turbine, and extraction valves are respectively provided at the lines. By calculating the measured values of ractor pressure, reactor core flow rate, vapor flow rate and reactor core inlet enthalpy determined to predetermined value using heat balance the objective feedwater enthalpy is obtained, is fed as an extraction valve opening or closing signal from a control equipment, the extraction stages of the turbine extraction are altered in accordance with this signal, and the feedwater enthalpy is controlled. (Sekiya, K.)

  9. Hand held control unit for controlling a display screen-oriented computer game, and a display screen-oriented computer game having one or more such control units

    NARCIS (Netherlands)

    2001-01-01

    A hand-held control unit is used to control a display screen-oriented computer game. The unit comprises a housing with a front side, a set of control members lying generally flush with the front side for through actuating thereof controlling actions of in-game display items, and an output for

  10. The chemical energy unit partial oxidation reactor operation simulation modeling

    Science.gov (United States)

    Mrakin, A. N.; Selivanov, A. A.; Batrakov, P. A.; Sotnikov, D. G.

    2018-01-01

    The chemical energy unit scheme for synthesis gas, electric and heat energy production which is possible to be used both for the chemical industry on-site facilities and under field conditions is represented in the paper. The partial oxidation reactor gasification process mathematical model is described and reaction products composition and temperature determining algorithm flow diagram is shown. The developed software product verification showed good convergence of the experimental values and calculations according to the other programmes: the temperature determining relative discrepancy amounted from 4 to 5 %, while the absolute composition discrepancy ranged from 1 to 3%. The synthesis gas composition was found out practically not to depend on the supplied into the partial oxidation reactor (POR) water vapour enthalpy and compressor air pressure increase ratio. Moreover, air consumption coefficient α increase from 0.7 to 0.9 was found out to decrease synthesis gas target components (carbon and hydrogen oxides) specific yield by nearly 2 times and synthesis gas target components required ratio was revealed to be seen in the water vapour specific consumption area (from 5 to 6 kg/kg of fuel).

  11. Method for evaluating operator inputs to digital controllers

    International Nuclear Information System (INIS)

    Venhuizen, J.R.

    1983-01-01

    Most industrial processes employ operator-interactive control systems. The performance of these control systems is influenced by the choice of control station (device through which operator enters control commands). While the importance of proper control-station selection is widely accepted, standard and simple selection methods are not available for the control station using color-graphics terminals. This paper describes a unique facility for evaluating the effectiveness of various control stations. In the facility, a process is simulated on a hybrid computer, color-graphics display terminals provide information to the operator, and different control stations accept input commands to control the simulation. Tests are being conducted to evaluate a keyboard, a graphics tablet, and a CRT touch panel for use as control stations on a nuclear power plant. Preliminary results indicate that our facility can be used to determine those situations where each type of station is advantageous

  12. Expert operator preferences in remote manipulator control systems

    International Nuclear Information System (INIS)

    Sundstrom, E.; Draper, J.V.; Fausz, A.; Woods, H.

    1995-06-01

    This report describes a survey of expert remote manipulator operators designed to identify features of control systems related to operator efficiency and comfort. It provides information for designing the control center for the Single-Shell Tank Waste Retrieval Manipulator System (TWRMS) Test Bed, described in a separate report. Research questions concerned preferred modes of control, optimum work sessions, sources of operator fatigue, importance of control system design features, and desired changes in control rooms. Participants comprised four expert remote manipulator operators at Oak Ridge National Laboratory, who individually have from 9 to 20 years of experience using teleoperators. The operators had all used rate and position control, and all preferred bilateral (force-reflecting) position control. They reported spending an average of 2.75 h in control of a teleoperator system during a typical shift. All were accustomed to working in a crew of two and alternating control and support roles in 2-h rotations in an 8-h shift. Operators reported that fatigue in using remote manipulator systems came mainly from watching TV monitors and making repetitive motions. Three of four experienced symptoms, including headaches and sore eyes, wrists, and back. Of 17 features of control rooms rated on importance, highest ratings went to comfort and support provided by the operator chair, location of controls, location of video monitors, video image clarity, types of controls, and control modes. When asked what they wanted to change, operators said work stations designed for comfort; simpler, lighter hand-controls; separate controls for each camera; better placement of remote camera; color monitors; and control room layouts that support crew interaction. Results of this small survey reinforced the importance of ergonomic factors in remote manipulation

  13. Nurse managers' decision-making in daily unit operation in peri-operative settings: a cross-sectional descriptive study.

    Science.gov (United States)

    Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina

    2016-09-01

    To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.

  14. Multivariable robust control of an air-handling unit: A comparison between pole-placement and H∞ controllers

    International Nuclear Information System (INIS)

    Moradi, Hamed; Bakhtiari-Nejad, Firooz; Saffar-Avval, Majid

    2012-01-01

    Highlights: ► Robust control of a multivariable air-handling unit (AHU). ► Controllers designed based on pole-placement and μ-synthesis. ► Robust performance in the presence of model uncertainties. ► Achievement of various tracking objectives in temperature and relative humidity. ► Comfort conditions in buildings with low energy consumption and operation cost. - Abstract: Control of air-conditioner units is essential to achieve satisfactory comfort conditions in buildings while keeping low energy consumption and operation costs. In this paper, a nonlinear multiinput and multioutput model (MIMO) of an air-handling unit (AHU) is considered. After linearization of the state equations around the operating points, an observer and a regulator are designed for the estimation of state variables and disturbance rejection, respectively. A realistic uncertain model is considered which constitutes various uncertainties associated with complex nonlinear model of AHU. In the presence of model uncertainties, a H ∞ -robust controller is designed to guarantee robust performance of the air-handling unit. In addition, a simple controller based on pole-placement approach is developed. Indoor temperature and relative humidity are controlled via manipulation of valve positions of air and cold water flow rates. Achievement of tracking objectives is investigated through various desired commands of indoor temperature and relative humidity (including a sequence of steps and ramps-steps). According to results, the H ∞ -robust controller guarantees the robust performance of the AHU in tracking of desired set-paths (while using the simple pole-placement controller leads to high oscillatory behavior of the output variables and control efforts). Moreover, using H ∞ -robust controller results in less energy consumption in comparison with the pole-placement controller.

  15. Control structures design for fossil power station units; Diseno de estructuras de control para unidades termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Palomares Gonzalez, Daniel; Ricano Castillo, Juan Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1990-12-31

    In this paper are designed an analyzed the control ties of a 300MW fossil unit at different operation levels. The design and analysis were developed on an operation range of 50% to 100% load. The main control ties were studied among which are the feedwater flow, the superheating zone temperatures and the generated output. The technique used for the design is the decomposition in singular values (DSV) of the plant transference matrix. This is a recent technique that permits finding the most important interactions among output-input variables, over a significative frequencies range for the transference matrix of the plant. For this purpose utilizes the control properties of the transference matrix, such as: control effort, output-input interaction and ruggedness with respect to uncertainties. The control structures obtained were tested in a digital model of a fossil plant unit. A comparison study of both structures (original and modified) showed enhancement in the performance of the power plant with modified structure. [Espanol] En este trabajo se disenan y analizan los lazos de control de una unidad termoelectrica de 300 MW, a diferentes niveles de operacion. El diseno y analisis se desarrollo sobre un rango de operacion de 50 a 100 por ciento de carga. Se estudiaron los principales lazos de control entre los que se encuentran el flujo de agua de alimentacion, las temperaturas de la zona de sobrecalentamiento y la potencia generada. La tecnica utilizada para el diseno es la descomposicion en valores singulares (DVS) de la matriz de transferencia de la planta. Esta es una tecnica reciente que permite encontrar las interacciones mas importantes entre variables entrada-salida, sobre un rango de frecuencias significativas para la matriz de transferencia de la planta. Utiliza para ello las propiedades de control de la matriz de transferencia, como son: esfuerzo de control, interaccion entrada-salida y robustez con respecto a incertidumbres. Las estructuras de control

  16. Control structures design for fossil power station units; Diseno de estructuras de control para unidades termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Palomares Gonzalez, Daniel; Ricano Castillo, Juan Manuel [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1989-12-31

    In this paper are designed an analyzed the control ties of a 300MW fossil unit at different operation levels. The design and analysis were developed on an operation range of 50% to 100% load. The main control ties were studied among which are the feedwater flow, the superheating zone temperatures and the generated output. The technique used for the design is the decomposition in singular values (DSV) of the plant transference matrix. This is a recent technique that permits finding the most important interactions among output-input variables, over a significative frequencies range for the transference matrix of the plant. For this purpose utilizes the control properties of the transference matrix, such as: control effort, output-input interaction and ruggedness with respect to uncertainties. The control structures obtained were tested in a digital model of a fossil plant unit. A comparison study of both structures (original and modified) showed enhancement in the performance of the power plant with modified structure. [Espanol] En este trabajo se disenan y analizan los lazos de control de una unidad termoelectrica de 300 MW, a diferentes niveles de operacion. El diseno y analisis se desarrollo sobre un rango de operacion de 50 a 100 por ciento de carga. Se estudiaron los principales lazos de control entre los que se encuentran el flujo de agua de alimentacion, las temperaturas de la zona de sobrecalentamiento y la potencia generada. La tecnica utilizada para el diseno es la descomposicion en valores singulares (DVS) de la matriz de transferencia de la planta. Esta es una tecnica reciente que permite encontrar las interacciones mas importantes entre variables entrada-salida, sobre un rango de frecuencias significativas para la matriz de transferencia de la planta. Utiliza para ello las propiedades de control de la matriz de transferencia, como son: esfuerzo de control, interaccion entrada-salida y robustez con respecto a incertidumbres. Las estructuras de control

  17. Orderly recruitment of motor units under optical control in vivo.

    Science.gov (United States)

    Llewellyn, Michael E; Thompson, Kimberly R; Deisseroth, Karl; Delp, Scott L

    2010-10-01

    A drawback of electrical stimulation for muscle control is that large, fatigable motor units are preferentially recruited before smaller motor units by the lowest-intensity electrical cuff stimulation. This phenomenon limits therapeutic applications because it is precisely the opposite of the normal physiological (orderly) recruitment pattern; therefore, a mechanism to achieve orderly recruitment has been a long-sought goal in physiology, medicine and engineering. Here we demonstrate a technology for reliable orderly recruitment in vivo. We find that under optical control with microbial opsins, recruitment of motor units proceeds in the physiological recruitment sequence, as indicated by multiple independent measures of motor unit recruitment including conduction latency, contraction and relaxation times, stimulation threshold and fatigue. As a result, we observed enhanced performance and reduced fatigue in vivo. These findings point to an unanticipated new modality of neural control with broad implications for nervous system and neuromuscular physiology, disease research and therapeutic innovation.

  18. Female Participation in Formed Police Units: A Report on the Integration of Women in Formed Police Units of Peacekeeping Operations

    Science.gov (United States)

    2012-09-01

    of Peacekeeping Operations in accor- dance with the principles of United Nations (UN) Res- olution 1325. To address this topic the study (1) briefly...that the eligibility criteria was revised to include women who played support roles to the combatants, as cooks, por- ters, sex slaves or spies

  19. Quick setup of test unit for accelerator control system

    International Nuclear Information System (INIS)

    Fu, W.; D'Ottavio, T.; Gassner, D.; Nemesure, S.; Morris, J.

    2011-01-01

    Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

  20. Fluid logic control circuit operates nutator actuator motor

    Science.gov (United States)

    1966-01-01

    Fluid logic control circuit operates a pneumatic nutator actuator motor. It has no moving parts and consists of connected fluid interaction devices. The operation of this circuit demonstrates the ability of fluid interaction devices to operate in a complex combination of series and parallel logic sequence.

  1. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  2. Design and Evaluation of a Fully Implantable Control Unit for Blood Pumps

    Science.gov (United States)

    Unthan, Kristin; Gräf, Felix; Laumen, Marco; Finocchiaro, Thomas; Sommer, Christoph; Lanmüller, Hermann; Steinseifer, Ulrich

    2015-01-01

    As the number of donor hearts is limited while more and more patients suffer from end stage biventricular heart failure, Total Artificial Hearts become a promising alternative to conventional treatment. While pneumatic devices sufficiently supply the patients with blood flow, the patient's quality of life is limited by the percutaneous pressure lines and the size of the external control unit. This paper describes the development of the control unit of the ReinHeart, a fully implantable Total Artificial Heart. General requirements for any implantable control unit are defined from a technical and medical point of view: necessity of a Transcutaneous Energy Transmission, autonomous operation, safety, geometry, and efficiency. Based on the requirements, a prototype is designed; it incorporates a LiFePo4 battery pack with charger, a rectifier for transcutaneous energy transmission, the motor's driver electronics, and a microcontroller which monitors and controls all functions. In validation tests, the control unit demonstrated a stable operation on TET and battery supply and a safe switching from one supply to the other. The overall mean efficiency is 14% on TET and 22% on battery supply. The control unit is suitable for chronic animal trials of the ReinHeart. PMID:26583095

  3. Operation and Control of Enzymatic Biodiesel Production

    DEFF Research Database (Denmark)

    Price, Jason Anthony; Huusom, Jakob Kjøbsted; Nordblad, Mathias

    This work explores the control of biodiesel production via an enzymatic catalyst. The process involves the transesterification of oils/fats with an alcohol (usually methanol or ethanol), using enzymatic catalysts to generate mono-alkyl esters (the basis of biodiesel) and glycerol as by......-product. Current literature indicates that enzymatic processing of oils and fats to produce biodiesel is technically feasible and developments in immobilization technology indicate that enzyme catalysts can become cost effective compared to chemical processing. However, with very few exceptions, enzyme technology...... is not currently used in commercial-scale biodiesel production. This is mainly due to non-optimized process designs, which do not use the full potential of the catalysts in a cost-efficient way. Furthermore is it unclear what process variables need to be monitored and controlled to ensure optimal economics...

  4. Induction thermoelastic actuator with controllable operation regime

    Czech Academy of Sciences Publication Activity Database

    Doležel, Ivo; Kotlan, V.; Krónerová, E.; Ulrych, B.

    2010-01-01

    Roč. 29, č. 4 (2010), s. 1004-1014 ISSN 0332-1649 R&D Projects: GA ČR GA102/09/1305 Institutional research plan: CEZ:AV0Z20570509 Keywords : control of position * thermoelastic actuator * electromagnetic field Subject RIV: JA - Electronics ; Optoelectronics, Electrical Engineering Impact factor: 0.386, year: 2010 www.emeraldinsight.com/compel.htm

  5. Control valve friction operational experience at Darlington NGD

    International Nuclear Information System (INIS)

    Speer, B.

    1995-01-01

    Proper installation of valve packing is an important part of ensuring that control valves operate as intended. Darlington NGD has developed a Valve Packing Program. This program combined with valve diagnostics has enabled the station to ensure that the operability of control valves is maintained after repacking. This paper outlines the process that is used for this. (author)

  6. Belt conveyor dynamics in transient operation for speed control

    NARCIS (Netherlands)

    He, D.; Pang, Y.; Lodewijks, G.

    2016-01-01

    Belt conveyors play an important role in continuous dry bulk material transport, especially at the mining industry. Speed control is expected to reduce the energy consumption of belt conveyors. Transient operation is the operation of increasing or decreasing conveyor speed for speed control.

  7. SSS-A attitude control prelaunch analysis and operations plan

    Science.gov (United States)

    Werking, R. D.; Beck, J.; Gardner, D.; Moyer, P.; Plett, M.

    1971-01-01

    A description of the attitude control support being supplied by the Mission and Data Operations Directorate is presented. Descriptions of the computer programs being used to support the mission for attitude determination, prediction, control, and definitive attitude processing are included. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

  8. Effects of a GPC-PID control strategy with hierarchical structure for a cooling coil unit

    International Nuclear Information System (INIS)

    Xu Min; Li Shaoyuan; Cai Wenjian; Lu Lu

    2006-01-01

    This paper presents a GPC-PID control strategy for a cooling-coil unit in heating, ventilation and air conditioning systems. By analysis of the cooling towers and chillers, different models in the occupied period are considered in each operating condition. Because of the complication of components, well tuned PID controllers are unsatisfied, and the results are poor over a wide range of operation conditions. To solve this problem, a GPC-PID controller with hierarchical structure is proposed based on minimizing the generalized predictive control criterion to tune conventional PID controller parameters. Simulation and experiments show that the proposed controller is able to deal with a wide range of operating conditions and to achieve better performance than conventional methods

  9. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  10. Explicit isospectral flows for the AKNS operator on the unit interval

    International Nuclear Information System (INIS)

    Amour, L

    2009-01-01

    We consider the AKNS operator on the unit interval. The boundary conditions are self-adjoint separated boundary conditions. For fixed boundary conditions, we make the formulae for flows induced by general tangent vector fields on isospectral sets explicit

  11. Analysis of the Vertical Takeoff and Landing Unmanned Aerial Vehicle (VTUAV) in Small Unit Urban Operations

    National Research Council Canada - National Science Library

    Cason, Roman

    2004-01-01

    ...) to replace the aging Pioneer Unmanned Aerial Vehicle (UAV) system. This thesis examines the critical elements this platform must possess to effectively support small units operating in urban environments...

  12. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  13. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  14. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  15. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  16. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  17. CNC Turning Center Operations and Prove Out. Computer Numerical Control Operator/Programmer. 444-334.

    Science.gov (United States)

    Skowronski, Steven D.

    This student guide provides materials for a course designed to instruct the student in the recommended procedures used when setting up tooling and verifying part programs for a two-axis computer numerical control (CNC) turning center. The course consists of seven units. Unit 1 discusses course content and reviews and demonstrates set-up procedures…

  18. Record of Decision for the Ford Building Waste Unit (643-11G) Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Fraley, S.

    2002-01-01

    This decision document presents the selected remedial for the Ford Building Waste Unit (FBWU), in Aiken, South Carolina, which was chosen in accordance with CERCLA, as amended by SARA, and, to the extent practical, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This decision is based on the Administrative Record File for this specific RCRA/CERCLA site

  19. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  20. Final test results for the ground operations demonstration unit for liquid hydrogen

    Science.gov (United States)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  1. Clinical microbiology in the intensive care unit: Strategic and operational characteristics

    Directory of Open Access Journals (Sweden)

    Bhattacharya S

    2010-01-01

    Full Text Available Infection is a major cause of morbidity and mortality among patients admitted in intensive care units (ICUs. The application of the principles and the practice of Clinical Microbiology for ICU patients can significantly improve clinical outcome. The present article is aimed at summarising the strategic and operational characteristics of this unique field where medical microbiology attempts to venture into the domain of direct clinical care of critically ill patients. The close and strategic partnership between clinical microbiologists and intensive care specialists, which is essential for this model of patient care have been emphasized. The article includes discussions on a variety of common clinical-microbiological problems faced in the ICUs such as ventilator-associated pneumonia, blood stream infections, skin and soft tissue infection, UTI, infection control, besides antibiotic management.

  2. Power supply control units for APS ring magnets

    International Nuclear Information System (INIS)

    Despe, O.D.

    1990-01-01

    The APS storage ring (1104 meters) is divided into 40 sectors. Each sector has 38 magnet coils in five magnet bases. Every alternate sector has an additional quadrupole magnet for skew correction. AR the main dipole magnets, two in each sector are connected in series and fed from one power supply unit. A base is controlled by one power supply control unit (PSCU). Each PSCU is connected to the host computer via a local area network (LAN). This note discusses the hardware configuration of the typical power supply control system used by the APS magnets and the software commands supported by the PSCU

  3. Design of BLDCM emulator for transmission control units

    Science.gov (United States)

    Liu, Chang; He, Yongyi; Zhang, Bodong

    2018-04-01

    According to the testing requirements of the transmission control unit, a brushless DC motor emulating system is designed based on motor simulation and power hardware-in-the-loop. The discrete motor model is established and a real-time numerical method is designed to solve the motor states. The motor emulator directly interacts with power stage of the transmission control unit using a power-efficient circuit topology and is compatible with sensor-less control. Experiments on a laboratory prototype help to verify that the system can emulate the real motor currents and voltages whenever the motor is starting up or suddenly loaded.

  4. Study on the main control room design for Hamaoka Unit No.5

    International Nuclear Information System (INIS)

    Tsuruta, Tadakazu; Sakamoto, Minoru; Maruyama, Tohru; Saito, Tadashi

    2000-01-01

    The main control room of nuclear power station is important to operate the power station and to promote public acceptance of nuclear power station. To enhance them, there is an idea of high ceiling control room with a gallery room located in backside middle upper floor. The control room is expected to enhance habitability and to offer visitors the fine view of the control room. In this study, psychological and physiological influence of such a high ceiling control room design on operators was investigated first. And then some human engineering requirements for desirable main control room were identified. A control room (ceiling height: about 5 meters) adequate to the requirements was designed, and finally the validity of the design was verified by means of full mockup model room tests. The results of this study are applied to the main control room design of Hamaoka Nuclear Power Station Unit No.5 (Chubu Electric Power Co., Inc.) (author)

  5. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  6. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  7. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  8. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  9. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  10. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    International Nuclear Information System (INIS)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements

  11. Projection Operator: A Step Towards Certification of Adaptive Controllers

    Science.gov (United States)

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  12. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  13. The Movement Control Battalions Role in Airfield Operations

    Science.gov (United States)

    2016-05-17

    November–December 2015 Army Sustainment44 The 53rd Transportation Bat-talion ( Movement Control) (MCB) arrived in Liberia in support of the...over Internet Pro- tocol. The MCT did not have these capabilities. During the deployment, the 53rd MCB consisted of the headquarters The Movement ...Control Battalion’s Role in Airfield Operations The 53rd Transportation Battalion ( Movement Control) assumed responsibility for airfield operations

  14. 21 CFR 111.117 - What quality control operations are required for equipment, instruments, and controls?

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for equipment, instruments, and controls? 111.117 Section 111.117 Food and Drugs FOOD AND DRUG ADMINISTRATION... and Process Control System: Requirements for Quality Control § 111.117 What quality control operations...

  15. Modeling and Control for Islanding Operation of Active Distribution Systems

    DEFF Research Database (Denmark)

    Cha, Seung-Tae; Wu, Qiuwei; Saleem, Arshad

    2011-01-01

    to stabilize the frequency. Different agents are defined to represent different resources in the distribution systems. A test platform with a real time digital simulator (RTDS), an OPen Connectivity (OPC) protocol server and the multi-agent based intelligent controller is established to test the proposed multi......Along with the increasing penetration of distributed generation (DG) in distribution systems, there are more resources for system operators to improve the operation and control of the whole system and enhance the reliability of electricity supply to customers. The distribution systems with DG...... are able to operate in is-landing operation mode intentionally or unintentionally. In order to smooth the transition from grid connected operation to islanding operation for distribution systems with DG, a multi-agent based controller is proposed to utilize different re-sources in the distribution systems...

  16. Thermal Performance of ATLAS Laser Thermal Control System Demonstration Unit

    Science.gov (United States)

    Ku, Jentung; Robinson, Franklin; Patel, Deepak; Ottenstein, Laura

    2013-01-01

    The second Ice, Cloud, and Land Elevation Satellite mission currently planned by National Aeronautics and Space Administration will measure global ice topography and canopy height using the Advanced Topographic Laser Altimeter System {ATLAS). The ATLAS comprises two lasers; but only one will be used at a time. Each laser will generate between 125 watts and 250 watts of heat, and each laser has its own optimal operating temperature that must be maintained within plus or minus 1 degree Centigrade accuracy by the Laser Thermal Control System (LTCS) consisting of a constant conductance heat pipe (CCHP), a loop heat pipe (LHP) and a radiator. The heat generated by the laser is acquired by the CCHP and transferred to the LHP, which delivers the heat to the radiator for ultimate rejection. The radiator can be exposed to temperatures between minus 71 degrees Centigrade and minus 93 degrees Centigrade. The two lasers can have different operating temperatures varying between plus 15 degrees Centigrade and plus 30 degrees Centigrade, and their operating temperatures are not known while the LTCS is being designed and built. Major challenges of the LTCS include: 1) A single thermal control system must maintain the ATLAS at 15 degrees Centigrade with 250 watts heat load and minus 71 degrees Centigrade radiator sink temperature, and maintain the ATLAS at plus 30 degrees Centigrade with 125 watts heat load and minus 93 degrees Centigrade radiator sink temperature. Furthermore, the LTCS must be qualification tested to maintain the ATLAS between plus 10 degrees Centigrade and plus 35 degrees Centigrade. 2) The LTCS must be shut down to ensure that the ATLAS can be maintained above its lowest desirable temperature of minus 2 degrees Centigrade during the survival mode. No software control algorithm for LTCS can be activated during survival and only thermostats can be used. 3) The radiator must be kept above minus 65 degrees Centigrade to prevent ammonia from freezing using no more

  17. What makes a control system usable? An operational viewpoint

    International Nuclear Information System (INIS)

    Clay, M.

    1990-01-01

    This report discusses the generally accepted successes and shortcomings of the various computer and hardware-based control systems at the Los Alamos Meson Physics Facility (LAMPF) from an operator's standpoint. LAMPF currently utilizes three separate control rooms that, although critically co-dependent, use distinct operating methods. The first, the Injector Control Room, which is responsible for the operation of the three ion sources, the 750 keV transport lines and the 201.25 MHz portion of the linac, uses a predominantly hardware-based control system. The second, the LANSCE Control Room, which is responsible for the operation of the Los Alamos Neutron Scattering Center, uses a graphical touch-panel interface with single-application screens as its control system. The third, the LAMPF Central Control Room, which is responsible for the overall operation of LAMPF, primarily uses a text-oriented keyboard interface with multiple applications per screen. Though each system provides generally reliable human interfacing to the enormously complex and diverse machine known as LAMPF, the operational requirements of speed, usability, and reliability are increasingly necessitating the use of a standard control system that incorporates the positive aspects of all three control systems. (orig.)

  18. 78 FR 14361 - U.S. Steel Tubular Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United...

    Science.gov (United States)

    2013-03-05

    ... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, PA; Notice of Initiation of Investigation To Terminate Certification of Eligibility Pursuant to... Tubular Products, McKeesport Tubular Operations Division, Subsidiary of United States Steel Corporation...

  19. Empirical investigation of workloads of operators in advanced control rooms

    International Nuclear Information System (INIS)

    Kim, Yochan; Jung, Wondea; Kim, Seunghwan

    2014-01-01

    This paper compares the workloads of operators in a computer-based control room of an advanced power reactor (APR 1400) nuclear power plant to investigate the effects from the changes in the interfaces in the control room. The cognitive-communicative-operative activity framework was employed to evaluate the workloads of the operator's roles during emergency operations. The related data were obtained by analyzing the tasks written in the procedures and observing the speech and behaviors of the reserved operators in a full-scope dynamic simulator for an APR 1400. The data were analyzed using an F-test and a Duncan test. It was found that the workloads of the shift supervisors (SSs) were larger than other operators and the operative activities of the SSs increased owing to the computer-based procedure. From these findings, methods to reduce the workloads of the SSs that arise from the computer-based procedure are discussed. (author)

  20. Operating experience with unit for sulfuric acid alkylation of isobutane by butylenes

    Energy Technology Data Exchange (ETDEWEB)

    Tagavov, I.T.; Sumanov, V.T.; Khadzhiev, S.N.

    1988-09-01

    The operation of units for the sulfuric acid alkylation of isobutanes by butylenes have been performed. The reaction was carried out in a KSG-3 horizontal sulfuric acid contractor. A butane-butylene fraction from catalytic cracking and an isobutane fraction from the central gas fractionating unit were used as a feedstock. The studies have shown that the unit will give a high-quality product under various conditions of operation. The specific consumption of sulfuric acid in processing different types of feed remains within acceptable limits.

  1. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  2. Safety measures for the main control board replacement project at Ikata units 1 and 2

    International Nuclear Information System (INIS)

    Hashimoto, Nozomu; Tada, Kenji

    2013-01-01

    When Units 1 and 2 of the Ikata Power Station underwent replacement of their main control boards, control cabinets, and associated equipment, it was necessary to remove all the control boards, cabinets, and cables from the control building including from the main control room. This meant the loss of operation and monitoring functions in the main control room and functions of control cabinets. To maintain the operation and monitoring functions required under plant shutdown conditions, temporary operation and monitoring equipment (i.e., temporary main control board) was installed in the temporary main control room. The advance preparations included a trial switching from the permanent to the temporary main control board to identify and address potential problems in advance. When the replacement work was underway, a work schedule sheet posted in the temporary and the permanent control rooms was used to prevent human errors caused by operators’ recognition errors. Monitoring and control signals were switched from the old boards to the temporary boards and from the temporary boards to the new boards at appropriate timings to ensure plant safety during the replacement operation. (author)

  3. OPERATING OF MOBILE MACHINE UNITS SYSTEM USING THE MODEL OF MULTICOMPONENT COMPLEX MOVEMENT

    Directory of Open Access Journals (Sweden)

    A. Lebedev

    2015-07-01

    Full Text Available To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  4. Operating of mobile machine units system using the model of multicomponent complex movement

    OpenAIRE

    A. Lebedev; R. Kaidalov; N. Artiomov; M. Shulyak; M. Podrigalo; D. Abramov; D. Klets

    2015-01-01

    To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite) movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  5. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  6. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  7. Secure, Autonomous, Intelligent Controller for Integrating Distributed Emergency Response Satellite Operations

    Science.gov (United States)

    Ivancic, William D.; Paulsen, Phillip E.; Miller, Eric M.; Sage, Steen P.

    2013-01-01

    This report describes a Secure, Autonomous, and Intelligent Controller for Integrating Distributed Emergency Response Satellite Operations. It includes a description of current improvements to existing Virtual Mission Operations Center technology being used by US Department of Defense and originally developed under NASA funding. The report also highlights a technology demonstration performed in partnership with the United States Geological Service for Earth Resources Observation and Science using DigitalGlobe(Registered TradeMark) satellites to obtain space-based sensor data.

  8. User Control Interface for W7-X Plasma Operation

    International Nuclear Information System (INIS)

    Spring, A.; Laqua, H.; Schacht, J.

    2006-01-01

    The WENDELSTEIN 7-X fusion experiment will be a highly complex device operated by a likewise complex control system. The fundamental configuration of the W7-X control system follows two major design principles: It reflects the strict hierarchy of the machine set-up with a set of subordinated components, which in turn can be run autonomously during commissioning and testing. Secondly, it links the basic machine operation (mainly given by the infrastructure status and the components readiness) and the physics program execution (i.e. plasma operation) on each hierarchy level and on different time scales. The complexity of the control system implies great demands on appropriate user interfaces: specialized tools for specific control tasks allowing a dedicated view on the subject to be controlled, hiding complexity wherever possible and reasonable, providing similar operation methods on each hierarchy level and both manual interaction possibilities and a high degree of intelligent automation. The contribution will describe the operation interface for experiment control including the necessary links to the machine operation. The users of ' Xcontrol ' will be both the W7-X session leaders during plasma discharge experiments and the components' or diagnostics' operators during autonomous mode or even laboratory experiments. The main ' Xcontrol ' features, such as program composition and validation, manual and automatic control instruments, resource survey, and process monitoring, will be presented. The implementation principles and the underlying communication will be discussed. (author)

  9. Optimal control of operation efficiency of belt conveyor systems

    International Nuclear Information System (INIS)

    Zhang, Shirong; Xia, Xiaohua

    2010-01-01

    The improvement of the energy efficiency of belt conveyor systems can be achieved at equipment or operation levels. Switching control and variable speed control are proposed in literature to improve energy efficiency of belt conveyors. The current implementations mostly focus on lower level control loops or an individual belt conveyor without operational considerations at the system level. In this paper, an optimal switching control and a variable speed drive (VSD) based optimal control are proposed to improve the energy efficiency of belt conveyor systems at the operational level, where time-of-use (TOU) tariff, ramp rate of belt speed and other system constraints are considered. A coal conveying system in a coal-fired power plant is taken as a case study, where great saving of energy cost is achieved by the two optimal control strategies. Moreover, considerable energy saving resulting from VSD based optimal control is also proved by the case study.

  10. Optimal control of operation efficiency of belt conveyor systems

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Shirong [Department of Automation, Wuhan University, Wuhan 430072 (China); Xia, Xiaohua [Department of Electrical, Electronic and Computer Engineering, University of Pretoria, Pretoria 0002 (South Africa)

    2010-06-15

    The improvement of the energy efficiency of belt conveyor systems can be achieved at equipment or operation levels. Switching control and variable speed control are proposed in literature to improve energy efficiency of belt conveyors. The current implementations mostly focus on lower level control loops or an individual belt conveyor without operational considerations at the system level. In this paper, an optimal switching control and a variable speed drive (VSD) based optimal control are proposed to improve the energy efficiency of belt conveyor systems at the operational level, where time-of-use (TOU) tariff, ramp rate of belt speed and other system constraints are considered. A coal conveying system in a coal-fired power plant is taken as a case study, where great saving of energy cost is achieved by the two optimal control strategies. Moreover, considerable energy saving resulting from VSD based optimal control is also proved by the case study. (author)

  11. Attitude Control Optimization for ROCSAT-2 Operation

    Science.gov (United States)

    Chern, Jeng-Shing; Wu, A.-M.

    one revolution. The purpose of this paper is to present the attitude control design optimization such that the maximum solar energy is ingested while minimum maneuvering energy is dissipated. The strategy includes the maneuvering sequence design, the minimization of angular path, the sizing of three magnetic torquers, and the trade-off of the size, number and orientations arrangement of momentum wheels.

  12. Decomposing Objectives and Functions in Power System Operation and Control

    DEFF Research Database (Denmark)

    Heussen, Kai; Lind, Morten

    2009-01-01

    mix of challenges posed by renewable energy sources, demand response technologies and smartgrid concepts, affecting all areas of power system operation. Both, new control modes and changes in market design are required. This paper presents a mean-ends perspective to the analysis of the control......The introduction of many new energy solutions requires the adaptation of classical operation paradigms in power systems. In the standard paradigm, a power system is some equivalent of a synchronous generators, a power line and an uncontrollable load. This paradigm has been challenged by a diverse...... structures and operation paradigms in present power systems. In a top-down approach, traditional frequency- and area-control mechanisms are formalized. It is demonstrated that future power system operation paradigms with different generation control modes and controllable demand can be modeled in a coherent...

  13. INTEGRATED ROBOT-HUMAN CONTROL IN MINING OPERATIONS

    Energy Technology Data Exchange (ETDEWEB)

    George Danko

    2005-04-01

    This report contains a detailed description of the work conducted in the first year of the project on Integrated Robot-Human Control in Mining Operations at University of Nevada, Reno. This project combines human operator control with robotic control concepts to create a hybrid control architecture, in which the strengths of each control method are combined to increase machine efficiency and reduce operator fatigue. The kinematics reconfiguration type differential control of the excavator implemented with a variety of ''software machine kinematics'' is the key feature of the project. This software re-configured excavator is more desirable to execute a given digging task. The human operator retains the master control of the main motion parameters, while the computer coordinates the repetitive movement patterns of the machine links. These repetitive movements may be selected from a pre-defined family of trajectories with different transformations. The operator can make adjustments to this pattern in real time, as needed, to accommodate rapidly-changing environmental conditions. A Bobcat{reg_sign} 435 excavator was retrofitted with electro-hydraulic control valve elements. The modular electronic control was tested and the basic valve characteristics were measured for each valve at the Robotics Laboratory at UNR. Position sensors were added to the individual joint control actuators, and the sensors were calibrated. An electronic central control system consisting of a portable computer, converters and electronic driver components was interfaced to the electro-hydraulic valves and position sensors. The machine is operational with or without the computer control system depending on whether the computer interface is on or off. In preparation for emulated mining tasks tests, typical, repetitive tool trajectories during surface mining operations were recorded at the Newmont Mining Corporation's ''Lone Tree'' mine in Nevada.

  14. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Directory of Open Access Journals (Sweden)

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  15. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  16. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  17. Use of Special Operations Forces in United Nations Missions: a Method to Resolve Complexity

    Science.gov (United States)

    2015-05-21

    physical stamina and psychological stability, followed by a rigorous training program are the imperatives to create SOF soldiers.42 Mark Bowden in...recommendation is that the United Nations should establish a Special Operations planning cell within the UN Department of Peacekeeping Operations. As of...now, the cell is nonexistent. This cell should be able to facilitate the integration of SOF into the overall peace operations concept. Finally, the

  18. 6th July 2010 - United Kingdom Science and Technology Facilities Council W. Whitehorn signing the guest book with Head of International relations F. Pauss, visiting the Computing Centre with Information Technology Department Head Deputy D. Foster, the LHC superconducting magnet test hall with Technology Department P. Strubin,the Centre Control Centre with Operation Group Leader M. Lamont and the CLIC/CTF3 facility with Project Leader J.-P. Delahaye.

    CERN Multimedia

    Teams : M. Brice, JC Gadmer

    2010-01-01

    6th July 2010 - United Kingdom Science and Technology Facilities Council W. Whitehorn signing the guest book with Head of International relations F. Pauss, visiting the Computing Centre with Information Technology Department Head Deputy D. Foster, the LHC superconducting magnet test hall with Technology Department P. Strubin,the Centre Control Centre with Operation Group Leader M. Lamont and the CLIC/CTF3 facility with Project Leader J.-P. Delahaye.

  19. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  20. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    International Nuclear Information System (INIS)

    Specht, W.L.

    2000-01-01

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity

  1. Quality Control and Dosimetry in Mammographic Units in Greece

    Energy Technology Data Exchange (ETDEWEB)

    Flioni-Vysa, A; Xenofos, S; Stamatelatos, E; Georgolopoulou, P [Department of Medical Physics, Saint Savvas Hospital, 171 Alexandras Avenue, Athens 115 22, (Greece)

    1994-12-31

    Quality control measurements have been carried out on 29 mammographic units. It was found that a large percentage of users obtained Optical Densities outside the recommended values. Resolution under routine conditions was below the limit of 14 lp/mm in about 50% of the units. The skin entrance dose was in a few cases in excess of 10 micro Gray, but the mean value was well below this upper limit. Analysis of the results obtained has indicated that proper calibration of kilo voltage panel indications and automatic exposure control systems is of outmost importance and should be performed regularly. (authors). 11 refs, 2 figs 3 tabs.

  2. An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management

    Science.gov (United States)

    2010-12-01

    An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY

  3. D0 HVAC System Heat Pump Controller Programming, Networking, and Operating Information

    International Nuclear Information System (INIS)

    Anderson, B.

    1999-01-01

    The purpose of this engineering note is to provide the necessary information to setup, program, and network the Electronic Systems USA Heat Pump Controller with the LON network card and Intellution Fix32 to operate properly within the HVAC system at D-Zero. The heat pump controllers are used for local temperature control of the office environments on the fifth and six floors of D-Zero. Heat pump units 1-6 are located in the ceiling of the sixth floor. Heat pump units 7-12 are found in the fifth floor ceiling. Heat pump unit 13 is in the Southeast corner of the fifth floor. Prior to installation the heat pump controller must be properly prepared to operate correctly in the HVAC system. Each heat pump unit must contain firmware (software) version 1.31 to operate properly on the network. Controllers with version 1.30 will not be able to communicate over the LON network. The manufacturer can only update the firmware version. Before installation a series of heat pump setpoints must be manually set using the Intelligent Stat. Connect the Intelligent Stat via the serial cable or wired connection.

  4. Operating room fire prevention: creating an electrosurgical unit fire safety device.

    Science.gov (United States)

    Culp, William C; Kimbrough, Bradly A; Luna, Sarah; Maguddayao, Aris J

    2014-08-01

    To reduce the incidence of surgical fires. Operating room fires represent a potentially life-threatening hazard and are triggered by the electrosurgical unit (ESU) pencil. Carbon dioxide is a fire suppressant and is a routinely used medical gas. We hypothesize that a shroud of protective carbon dioxide covering the tip of the ESU pencil displaces oxygen, thereby preventing fire ignition. Using 3-dimensional modeling techniques, a polymer sleeve was created and attached to an ESU pencil. This sleeve was connected to a carbon dioxide source and directed the gas through multiple precisely angled ports, generating a cone of fire-suppressive carbon dioxide surrounding the active pencil tip. This device was evaluated in a flammability test chamber containing 21%, 50%, and 100% oxygen with sustained ESU activation. The sleeve was tested with and without carbon dioxide (control) until a fuel was ignited or 30 seconds elapsed. Time to ignition was measured by high-speed videography. Fires were ignited with each control trial (15/15 trials). The control group median ± SD ignition time in 21% oxygen was 3.0 ± 2.4 seconds, in 50% oxygen was 0.1 ± 1.8 seconds, and in 100% oxygen was 0.03 ± 0.1 seconds. No fire was observed when the fire safety device was used in all concentrations of oxygen (0/15 trials; P fire ignition was 76% to 100%. A sleeve creating a cone of protective carbon dioxide gas enshrouding the sparks from an ESU pencil effectively prevents fire in a high-flammability model. Clinical application of this device may reduce the incidence of operating room fires.

  5. Operation control device for a nuclear reactor fuel exchanger

    International Nuclear Information System (INIS)

    Aida, Takashi.

    1984-01-01

    Purpose: To provide a operation control device for a nuclear reactor fuel exchanger with reduced size and weight capable of optionally meeting the complicated and versatile mode of the operation scope. Constitution: The operation range of a fuel exchanger is finely divided so as to attain the state capable of discriminating between operation-allowable range and operation-inhibitive range, which are stored in a memory circuit. Upon operating the fuel exchanger, the position is detected and a divided range data corresponding to the present position is taken out from the memory circuit so as to determine whether the fuel exchanger is to be run or stopped. Use of reduced size and compact IC circuits (calculation circuit, memory circuit, data latch circuit) and input/output interface circuits or the likes contributes to the size reduction of the exchanger control system to enlarge the floor maintenance space. (Moriyama, K.)

  6. Pivoting output unit control systems activated by jacks. [for controlling aircraft flaps

    Science.gov (United States)

    Belliere, P.

    1978-01-01

    An invention to be used for controlling aircraft flaps is described. It is applicable to control systems with two coaxial output units which pivot simultaneously with respect to two fixed units and which are activated by two opposed, straight coaxial jacks.

  7. Economics of tobacco control research initiative: Operating costs for ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Economics of tobacco control research initiative: Operating costs for capacity building ... (but misinformed) beliefs about the economic benefits of the tobacco industry ... Nutrition, health policy, and ethics in the age of public-private partnerships.

  8. Control and operation cost optimization of the HISS cryogenic system

    International Nuclear Information System (INIS)

    Porter, J.; Anderson, D.; Bieser, F.

    1984-01-01

    This chapter describes a control strategy for the Heavy Ion Spectrometer System (HISS), which relies upon superconducting coils of cryostable design to provide a particle bending field of 3 tesla. The control strategy has allowed full time unattended operation and significant operating cost reductions. Microprocessor control of flash boiling style LIN circuits has been successful. It is determined that the overall operating cost of most cryogenic systems using closed loop helium systems can be minimized by properly balancing the total heat load between the helium and nitrogen circuits to take advantage of the non-linearity which exists in the power input to 4K refrigeration characteristic. Variable throughput compressors have the advantage of turndown capability at steady state. It is concluded that a hybrid system using digital and analog input for control, data display and alarms enables full time unattended operation

  9. Data mining of air traffic control operational errors

    Science.gov (United States)

    2006-01-01

    In this paper we present the results of : applying data mining techniques to identify patterns and : anomalies in air traffic control operational errors (OEs). : Reducing the OE rate is of high importance and remains a : challenge in the aviation saf...

  10. Neutron field control cybernetics model of RBMK reactor operator

    International Nuclear Information System (INIS)

    Polyakov, V.V.; Postnikov, V.V.; Sviridenkov, A.N.

    1992-01-01

    Results on parameter optimization for cybernetics model of RBMK reactor operator by power release control function are presented. Convolutions of various criteria applied previously in algorithms of the program 'Adviser to reactor operator' formed the basis of the model. 7 refs.; 4 figs

  11. The VEPP-2000 Collider Control System: Operational Experience

    CERN Document Server

    Senchenko, A I; Lysenko, A P; Rogovsky, Yu A; Shatunov, P Yu

    2017-01-01

    The VEPP-2000 collider was commissioned and operated successfully in 2010-2013. During the operation the facility underwent continuous updates and experience in maintenance was acquired. Strong cooperation between the staff of the accelerator complex and the developers of the control system proved effective for implementing the necessary changes in a short time.

  12. 100 Area source operable unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    In accordance with the Hanford Past-Practice Strategy (HPPS), a focused feasibility study (FFS) is performed for those waste sites which have been identified as candidates for interim remedial measures (IRM) based on information contained in applicable work plans and limited field investigations (LFI). The FFS process for the 100 Area source operable units will be conducted in two stages. This report, hereafter referred to as the Process Document, documents the first stage of the process. In this stage, IRM alternatives are developed and analyzed on the basis of waste site groups associated with the 100 Area source operable units. The second stage, site-specific evaluation of the IRM alternatives presented in this Process Document, is documented in a series of operable unit-specific reports. The objective of the FFS (this Process Document and subsequent operable unit-specific reports) is to provide decision makers with sufficient information to allow appropriate and timely selection of IRM for sites associated with the 100 Area source operable units. Accordingly, the following information is presented: a presentation of remedial action objectives; a description of 100 Area waste site groups and associated group profiles; a description of IRM alternatives; and detailed and comparative analyses of the IRM alternatives

  13. Units 3 and 4 steam generators new water level control system

    International Nuclear Information System (INIS)

    Dragoev, D.; Genov, St.

    2001-01-01

    The Steam Generator Water Level Control System is one of the most important for the normal operation systems, related to the safety and reliability of the units. The main upgrading objective for the SG level and SGWLC System modernization is to assure an automatic maintaining of the SG level within acceptable limits (below protections and interlocks) from 0% to 100% of the power in normal operation conditions and in case of transients followed by disturbances in the SG controlled parameters - level, steam flow, feedwater flow and/or pressure/temperature. To achieve this objective, the computerized controllers of new SG water level control system follows current computer control technology and is implemented together with replacement of the feedwater control valves and the needed I and C equipment. (author)

  14. Evaluation of new control rooms by operator performance analysis

    International Nuclear Information System (INIS)

    Mori, M; Tomizawa, T.; Tai, I.; Monta, K.; Yoshimura, S.; Hattori, Y.

    1987-01-01

    An advanced supervisory and control system called PODIA TM (Plant Operation by Displayed Information and Automation) was developed by Toshiba. Since this system utilizes computer driven CRTs as a main device for information transfer to operators, thorough system integration tests were performed at the factory and evaluations were made of operators' assessment from the initial experience of the system. The PODIA system is currently installed at two BWR power plants. Based on the experiences from the development of PODIA, a more advanced man-machine interface, Advanced-PODIA (A-PODIA), is developed. A-PODIA enhances the capabilities of PODIA in automation, diagnosis, operational guidance and information display. A-PODIA has been validated by carrying out systematic experiments with a full-scope simulator developed for the validation. The results of the experiments have been analyzed by the method of operator performance analysis and applied to further improvement of the A-PODIA system. As a feedback from actual operational experience, operator performance data in simulator training is an important source of information to evaluate human factors of a control room. To facilitate analysis of operator performance, a performance evaluation system has been developed by applying AI techniques. The knowledge contained in the performance evaluation system was elicited from operator training experts and represented as rules. The rules were implemented by employing an object-oriented paradigm to facilitate knowledge management. In conclusion, it is stated that the feedback from new control room operation can be obtained at an early stage by validation tests and also continuously by comprehensive evaluation (with the help of automated tools) of operator performance in simulator training. The results of operator performance analysis can be utilized for improvement of system design as well as operator training. (author)

  15. Quench monitoring and control system and method of operating same

    Science.gov (United States)

    Ryan, David Thomas; Laskaris, Evangelos Trifon; Huang, Xianrui

    2006-05-30

    A rotating machine comprising a superconductive coil and a temperature sensor operable to provide a signal representative of superconductive coil temperature. The rotating machine may comprise a control system communicatively coupled to the temperature sensor. The control system may be operable to reduce electric current in the superconductive coil when a signal representative of a defined superconducting coil temperature is received from the temperature sensor.

  16. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  17. Multipurpose units: combining of technological operations of a soil cultivating and seeding

    Directory of Open Access Journals (Sweden)

    D. A. Petukhov

    2015-01-01

    Full Text Available The modern domestic market of technique for grain crops seeding differs variety of machines brands and types. The intensive type technologies combining technological operations of a soil cultivating and grain crops seeding in one pass are more widely used. The authors have established that one-operational units in new machine park have to be replaced multipurpose, universal and combined machines. Such approach will reduce number of machines in grain production from 20-30 to 5-6 name titles. Possibilities of multipurpose sowing units for simultaneous fertilizers application, soil cultivating and weeds destruction were analyzed. It was specified that nowadays there are several technologies types with two, four or six operations overlapping. Operational performance, technological and economical efficiency of the best multipurpose and also efficiency of technological operations overlapping at grain crops cultivating in the conditions of their real operation and at a trial establishment in the Kuban research institute of information and technical and economic studies of agro-industrial complex engineering and technical services were studied. Tit was defined that use of multipurpose sowing units and also studied efficiency of decreases operational costs by 48-71 percent, fuel consumption - by 41-76 percent and reduces labor input by 72-80 percent. Thus grain crops seeding is possible in optimal agrotime because of 4-6 technological operations overlapping in one pass.

  18. Development of Protection and Control Unit for Distribution Substation

    Science.gov (United States)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  19. 76 FR 14637 - State Medicaid Fraud Control Units; Data Mining

    Science.gov (United States)

    2011-03-17

    ...] State Medicaid Fraud Control Units; Data Mining AGENCY: Office of Inspector General (OIG), HHS. ACTION... and analyzing State Medicaid claims data, known as data mining. To support and modernize MFCU efforts... (FFP) in the costs of defined data mining activities under specified conditions. In addition, we...

  20. Purpose and benefit of control system training for operators

    International Nuclear Information System (INIS)

    Zimoch, E.; Luedeke, A.

    2012-01-01

    The complexity of accelerators is ever increasing and today it is typical that a large number of feedback loops are implemented, based on sophisticated models which describe the underlying physics. Despite this increased complexity the machine operators must still effectively monitor and supervise the desired behavior of the accelerator. This is not alone sufficient; additionally, the correct operation of the control system must also be verified. This is not always easy since the structure, design, and performance of the control system is usually not visualized and is often hidden to the operator. To better deal with this situation operators need some knowledge of the control system in order to react properly in the case of problems. In fact operators need mental models of the control system to recognize fault states and react appropriate to errors and misbehavior of both, the accelerator and the control system itself. Mental models gained only on infrequent experience can be imprecise or plain wrong in worst case. Control system training can provide a foundation to build better mental models and therefore help to enhance operator responses and machine availability. For a refinement of the mental model repeated experience is needed. This can be provided by training sessions at the real accelerator

  1. Charge-Control Unit for Testing Lithium-Ion Cells

    Science.gov (United States)

    Reid, Concha M.; Mazo, Michelle A.; Button, Robert M.

    2008-01-01

    A charge-control unit was developed as part of a program to validate Li-ion cells packaged together in batteries for aerospace use. The lithium-ion cell charge-control unit will be useful to anyone who performs testing of battery cells for aerospace and non-aerospace uses and to anyone who manufacturers battery test equipment. This technology reduces the quantity of costly power supplies and independent channels that are needed for test programs in which multiple cells are tested. Battery test equipment manufacturers can integrate the technology into their battery test equipment as a method to manage charging of multiple cells in series. The unit manages a complex scheme that is required for charging Li-ion cells electrically connected in series. The unit makes it possible to evaluate cells together as a pack using a single primary test channel, while also making it possible to charge each cell individually. Hence, inherent cell-to-cell variations in a series string of cells can be addressed, and yet the cost of testing is reduced substantially below the cost of testing each cell as a separate entity. The unit consists of electronic circuits and thermal-management devices housed in a common package. It also includes isolated annunciators to signal when the cells are being actively bypassed. These annunciators can be used by external charge managers or can be connected in series to signal that all cells have reached maximum charge. The charge-control circuitry for each cell amounts to regulator circuitry and is powered by that cell, eliminating the need for an external power source or controller. A 110-VAC source of electricity is required to power the thermal-management portion of the unit. A small direct-current source can be used to supply power for an annunciator signal, if desired.

  2. Quality control of radiopharmaceutical dose calibrators in nuclear medicine unit

    International Nuclear Information System (INIS)

    Oliveira, C.F.M.; Lucindo Junior, C.R.; Lopes Filho, F.J.

    2015-01-01

    As part of the program to ensure quality in nuclear medicine unit, in addition to diagnostic procedures, are evaluated activity meters, which is intended to measure the aliquot of radiation of radionuclides and / or radiopharmaceuticals that are administered to patients undergoing diagnostic investigation and / or therapeutic treatment. The good operating condition of dose calibrators is essential to ensure efficiency, safety and reliability of the measurements, once the lack of accuracy in the responses of these equipments can cause significant errors in the activity administered to the patient and may result in poor quality images resulting in the repetition of examis and interference in the successful treatment of the patient. This study aims to, considering the need for constant evaluation of the functioning of the activity meters and the fact that this issue be part the responsibilities of the professional of radiology, perform quality control testing of these instruments in relation to the most recent norm of National Commission of nuclear Energy (CNEN-NN 3:05) in Brazil, that is also in according to the international standards and reference values established during acceptance testing of these instruments in a nuclear medicine service. For this, was made a review of specific literature and the use of barium, cobalt and cesium to the tests in a nuclear medicine service of the state of Pernambuco in Brazil. The obtained results of the specific tests utilized to verify the correct working of the dose calibrators show coherency with the resolutions of the CNEN-NN 3:05 and are also in agreement with the international standards to that the measurement of activities be made with accurate results and thereby contribute to the proper functioning of nuclear medicine service. (authors)

  3. Microgravity induced changes in the control of motor units

    Science.gov (United States)

    de Luca, C.; Roy, S.

    The goal of this project is to understand the effects of microgravity on the control of muscles. It is motivated by the notion that in order to adequately address microgravity-induced deterioration in the force generating capacity of muscles, one needs to understand the changes in the control aspects in addition to histochemical and morphological changes. The investigations into muscle control need to include the regulation of the firing activity of motor units that make up a muscle and the coordination of different muscles responsible for the control of a joint. In order to understand the effects of microgravity on these two aspects of muscle control, we will test astronauts before and after spaceflight. The investigations of the control of motor units will involve intramuscular EMG techniques developed in our laboratory. We will use a quadrifilar electrode to detect simultaneously three differential channels of EMG activity. These data will be decomposed accurately using a sophisticated set of algorithms constructed with artificial intelligence knowledge- based techniques. Particular attention will be paid to the firing rate and recruitment behavior of motor units and we will study the degree of cross-correlation of the firing rates. This approach will enable us to study the firing behavior of several (approx. 10) concurrently active motor units. This analysis will enable us to detect modifications in the control of motor units. We will perform these investigations in a hand muscle, which continues being used in prehensile tasks in space, and a leg muscle whose antigravity role is not needed in space. The comparison of the effects of weightlessness on these muscles will determine if continued use of muscles in space deters the possible deleterious effects of microgravity on the control of motor units, in addition to slowing down atrophy. We are particularly interested in comparing the results of this study to similar data already obtained from elderly subjects

  4. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  5. Compex system for teaching and training operators for TPP and NPP power units

    International Nuclear Information System (INIS)

    Tsiptsyura, R.D.

    1985-01-01

    Requirements, taken as a principle for constructing the system for operator teaching and training (OTT), have been formulated on the basis of investigation of operators' work at TPP and NPP power units. Functional structure and a structural block-diagram for OTT are built. As a criterion, which determines the structure of any trainers, being a part of OTT a requirement has been chosen satisfying the correspondence beetween habits developed with the help of trainers and habits of real operators' work. Results of analysis permit to confirm that refusal or under statement of the role of any stage of operator training leads to reduction of quality of his training

  6. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  7. The DCU: the detector control unit for SPICA-SAFARI

    Science.gov (United States)

    Clénet, Antoine; Ravera, Laurent; Bertrand, Bernard; den Hartog, Roland H.; Jackson, Brian D.; van Leeuven, Bert-Joost; van Loon, Dennis; Parot, Yann; Pointecouteau, Etienne; Sournac, Anthony

    2014-08-01

    IRAP is developing the warm electronic, so called Detector Control Unit" (DCU), in charge of the readout of the SPICA-SAFARI's TES type detectors. The architecture of the electronics used to readout the 3 500 sensors of the 3 focal plane arrays is based on the frequency domain multiplexing technique (FDM). In each of the 24 detection channels the data of up to 160 pixels are multiplexed in frequency domain between 1 and 3:3 MHz. The DCU provides the AC signals to voltage-bias the detectors; it demodulates the detectors data which are readout in the cold by a SQUID; and it computes a feedback signal for the SQUID to linearize the detection chain in order to optimize its dynamic range. The feedback is computed with a specific technique, so called baseband feedback (BBFB) which ensures that the loop is stable even with long propagation and processing delays (i.e. several µs) and with fast signals (i.e. frequency carriers at 3:3 MHz). This digital signal processing is complex and has to be done at the same time for the 3 500 pixels. It thus requires an optimisation of the power consumption. We took the advantage of the relatively reduced science signal bandwidth (i.e. 20 - 40 Hz) to decouple the signal sampling frequency (10 MHz) and the data processing rate. Thanks to this method we managed to reduce the total number of operations per second and thus the power consumption of the digital processing circuit by a factor of 10. Moreover we used time multiplexing techniques to share the resources of the circuit (e.g. a single BBFB module processes 32 pixels). The current version of the firmware is under validation in a Xilinx Virtex 5 FPGA, the final version will be developed in a space qualified digital ASIC. Beyond the firmware architecture the optimization of the instrument concerns the characterization routines and the definition of the optimal parameters. Indeed the operation of the detection and readout chains requires to properly define more than 17 500 parameters

  8. Mitigating the Long term Operating Extreme Load through Active Control

    DEFF Research Database (Denmark)

    Koukoura, Christina; Natarajan, Anand

    2014-01-01

    blade azimuth location are shown to affect the extreme blade load magnitude during operation in normal turbulence wind input. The simultaneously controlled operation of generator torque variation and pitch variation at low blade pitch angles is detected to be responsible for very high loads acting...... on the blades. Through gain scheduling of the controller (modifications of the proportional Kp and the integral Ki gains) the extreme loads are mitigated, ensuring minimum instantaneous variations in the power production for operation above rated wind speed. The response of the blade load is examined...

  9. Study of the thermal behavior of a latent heat cold storage unit operating under frosting conditions

    International Nuclear Information System (INIS)

    Simard, A.P.; Lacroix, M.

    2003-01-01

    A study is performed of the thermal behavior of a latent heat cold storage unit operating under frosting conditions. This unit is employed to maintain the temperature inside the refrigerated compartment of a truck below 265 K. The system consists of parallel plates filled with a phase change material (PCM) that absorbs heat from the flow of warm moist air. A mathematical model for the system is first presented and, next, validated with numerical and experimental data. It is then exploited to assess the effects of design parameters and operating conditions on the performance of the system. The recommended thickness and distance separating the PCM plates are found to be 50x10 -3 and 30x10 -3 m, respectively. The results indicate that the performance of the unit is enhanced by turbulent air flow in spite of the increased pressure loss and accentuated frost growth. The unit also performs well even when the surrounding relative humidity is 100%

  10. Energy Savings and Economics of Advanced Control Strategies for Packaged Air-Conditioning Units with Gas Heat

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Weimin; Katipamula, Srinivas; Huang, Yunzhi; Brambley, Michael R.

    2011-12-31

    Pacific Northwest National Laboratory (PNNL) with funding from the U.S. Department of Energy's Building Technologies Program (BTP) evaluated a number of control strategies that can be implemented in a controller, to improve the operational efficiency of the packaged air conditioning units. The two primary objectives of this research project are: (1) determine the magnitude of energy savings achievable by retrofitting existing packaged air conditioning units with advanced control strategies not ordinarily used for packaged units and (2) estimating what the installed cost of a replacement control with the desired features should be in various regions of the U.S. This document reports results of the study.

  11. Post-operative pain control after tonsillectomy: dexametasone vs tramadol.

    Science.gov (United States)

    Topal, Kubra; Aktan, Bulent; Sakat, Muhammed Sedat; Kilic, Korhan; Gozeler, Mustafa Sitki

    2017-06-01

    Tramadol was found to be more effective than dexamethasone in post-operative pain control, with long-lasting relief of pain. This study aimed to compare the effects of pre-operative local injections of tramadol and dexamethasone on post-operative pain, nausea and vomiting in patients who underwent tonsillectomy. Sixty patients between 3-13 years of age who were planned for tonsillectomy were included in the study. Patients were divided into three groups. Group 1 was the control group. Patients in Group 2 received 0.3 mg/kg Dexamethasone and Group 3 received 0.1 mg/kg Tramadol injection to the peritonsillary space just before the operation. Patients were evaluated for nausea, vomiting, and pain. When the control and the dexamethasone groups were compared; there were statistically significant differences in pain scores at post-operative 15 and 30 min, whereas there was no statistically significant difference in pain scores at other hours. When the control and tramadol groups were compared, there was a statistically significant difference in pain scores at all intervals. When tramadol and dexamethasone groups were compared, there was no statistically significant difference in pain scores at post-operative 15 and 30 min, 1 and 2 h, whereas there was a statistically significant difference in pain scores at post-operative 6 and 24 h.

  12. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  13. Control Theory Perspective of Effects-Based Thinking and Operations: Modelling "Operations" as a Feedback Control System

    National Research Council Canada - National Science Library

    Farrell, Philip S

    2007-01-01

    This paper explores operations that involve effects-based thinking (EBT) using Control Theory techniques in order to highlight the concept's fundamental characteristics in a simple and straightforward manner...

  14. Research on Integrated Control of Microgrid Operation Mode

    Science.gov (United States)

    Cheng, ZhiPing; Gao, JinFeng; Li, HangYu

    2018-03-01

    The mode switching control of microgrid is the focus of its system control. According to the characteristics of different control, an integrated control system is put forward according to the detecting voltage and frequency deviation after switching of microgrid operating mode. This control system employs master-slave and peer-to-peer control. Wind turbine and photovoltaic(PV) adopt P/Q control, so the maximum power output can be achieved. The energy storage will work under the droop control if the system is grid-connected. When the system is off-grid, whether to employ droop control or P/f control is determined by system status. The simulation has been done and the system performance can meet the requirement.

  15. Estimation of the optimal operating conditions for a radiation chemical neutralization unit

    International Nuclear Information System (INIS)

    Putilov, A.V.; Kamenetskaya, S.A.; Pshezhetskii, S.Ya.; Kazakov, M.S.; Kudryavtsev, S.L.; Petrukhin, N.V.; Misharin, B.A.; Koneev, V.Z.

    1985-01-01

    An estimate is made of the effect of the hydrodynamic conditions on the efficiency of foam units for the radiation chemical neutralization of impurities, taking into account the penetrating power of accelerated electrons having various energies. Expressions are obtained for calculating the efficiency of such units with sectionized operation of the chamber and taking account of the effect of incomplete mixing of the products of radiolysis through the height of the foam layer

  16. Design and operational parameters of transportable supercritical water oxidation waste destruction unit

    International Nuclear Information System (INIS)

    McFarland, R.D.; Brewer, G.R.; Rofer, C.K.

    1991-12-01

    Supercritical water oxidation (SCWO) is the destruction of hazardous waste by oxidation in the presence of water at temperatures and pressures above its critical point. A 1 gal/h SCWO waste destruction unit (WDU) has been designed, built, and operated at Los Alamos National Laboratory. This unit is transportable and is intended to demonstrate the SCWO technology on wastes at Department of Energy sites. This report describes the design of the WDU and the preliminary testing phase leading to demonstration

  17. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 7, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Unit 3 generated 1,968,074 MWh(e) net electric power and the generator was on line 2,802.9 hrs. Unit 4 generated 2,560,476 MWh(e) and was on line 3,944.8 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, radiological environmental monitoring, and occupational personnel radiation monitoring

  18. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  19. Mass and number size distributions of emitted particulates at five important operation units in a hazardous industrial waste incineration plant.

    Science.gov (United States)

    Lin, Chi-Chi; Huang, Hsiao-Lin; Hsiao, Wen-Yuan

    2016-01-01

    Past studies indicated particulates generated by waste incineration contain various hazardous compounds. The aerosol characteristics are very important for particulate hazard control and workers' protection. This study explores the detailed characteristics of emitted particulates from each important operation unit in a rotary kiln-based hazardous industrial waste incineration plant. A dust size analyzer (Grimm 1.109) and a scanning mobility particle sizer (SMPS) were used to measure the aerosol mass concentration, mass size distribution, and number size distribution at five operation units (S1-S5) during periods of normal operation, furnace shutdown, and annual maintenance. The place with the highest measured PM10 concentration was located at the area of fly ash discharge from air pollution control equipment (S5) during the period of normal operation. Fine particles (PM2.5) constituted the majority of the emitted particles from the incineration plant. The mass size distributions (elucidated) made it clear that the size of aerosols caused by the increased particulate mass, resulting from work activities, were mostly greater than 1.5 μm. Whereas the number size distributions showed that the major diameters of particulates that caused the increase of particulate number concentrations, from work activities, were distributed in the sub micrometer range. The process of discharging fly ash from air pollution control equipment can significantly increase the emission of nanoparticles. The mass concentrations and size distributions of emitted particulates were different at each operation unit. This information is valuable for managers to take appropriate strategy to reduce the particulate emission and associated worker exposure.

  20. Operation safety of control systems. Principles and methods

    International Nuclear Information System (INIS)

    Aubry, J.F.; Chatelet, E.

    2008-01-01

    This article presents the main operation safety methods that can be implemented to design safe control systems taking into account the behaviour of the different components with each other (binary 'operation/failure' behaviours, non-consistent behaviours and 'hidden' failures, dynamical behaviours and temporal aspects etc). To take into account these different behaviours, advanced qualitative and quantitative methods have to be used which are described in this article: 1 - qualitative methods of analysis: functional analysis, preliminary risk analysis, failure mode and failure effects analyses; 2 - quantitative study of systems operation safety: binary representation models, state space-based methods, event space-based methods; 3 - application to the design of control systems: safe specifications of a control system, qualitative analysis of operation safety, quantitative analysis, example of application; 4 - conclusion. (J.S.)

  1. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  2. Device for controlling the hydraulic lifter of drilling unit

    Energy Technology Data Exchange (ETDEWEB)

    Kraskov, P N

    1981-04-10

    A device is suggested for controlling the hydraulic lifter of a drilling unit. It contains a throttling valve with cylinder for servocontrol, mechanism for assigning the program for lowering velocity connected to the power cylinder, and oil tank. In order to improve the reliable concentration of the drilling unit by guaranteeing possible alternation for halting descent when the string falls on a projection in the well, the device is equipped with a normally open two-position hydraulically controlled distributor with spring return connected to the working surface of the power cylinder and valve connected to it with logical function of ILI for hydraulic control of the normally opened two-position distributor. The latter connects the working cavity of the servocontrol cylinder with the oil tank.

  3. Green operations of belt conveyors by means of speed control

    NARCIS (Netherlands)

    He, D.; Pang, Y.; Lodewijks, G.

    2017-01-01

    Belt conveyors can be partially loaded due to the variation of bulk material flow loaded onto the conveyor. Speed control attempts to reduce the belt conveyor energy consumption and to enable the green operations of belt conveyors. Current research of speed control rarely takes the conveyor dynamics

  4. On the unboundedness of control operators for bilinear systems ...

    African Journals Online (AJOL)

    The aim of this work is to study the classes of unbounded linear control operators which ensure the existence and uniqueness of the mild and strong solutions of certain bilinear control systems. By an abstract approach, similar to that adopted by Weiss [18], we obtain a connection between these classes and those ...

  5. Analysis of Access Control Policies in Operating Systems

    Science.gov (United States)

    Chen, Hong

    2009-01-01

    Operating systems rely heavily on access control mechanisms to achieve security goals and defend against remote and local attacks. The complexities of modern access control mechanisms and the scale of policy configurations are often overwhelming to system administrators and software developers. Therefore, mis-configurations are common, and the…

  6. Multilayer control for inverters in parallel operation without signal interconnection

    DEFF Research Database (Denmark)

    Hua, Ming; Hu, Haibing; Xing, Yan

    2011-01-01

    A multilayer control is proposed for inverters with wireless parallel operation in this paper. The control is embedded in every inverter respectively and consists of three layers. The first layer is based on an improved droop method, which shares the active and reactive power in each module...

  7. Multilayer Control for Inverters in Parallel Operation without Intercommunications

    DEFF Research Database (Denmark)

    Hua, Ming; Hu, Haibing; Xing, Yan

    2012-01-01

    In this paper, a multilayer control is proposed for inverters able to operate in parallel without intercommunications. The first control layer is an improved droop method that introduces power proportional terms into the conventional droop scheme, letting both active and reactive power to be shared...

  8. Post operative pain control in inguinal hernia repair: comparison of ...

    African Journals Online (AJOL)

    Background: Post-operative pain control is a key factor in surgery. It greatly increases patient satisfaction, and influences the hospital stay period. Local wound infiltration has often been used to control postoperative pain following hernia surgery, with the use of the conventional local anesthetics like Lidocaine or ...

  9. Novel operation and control modes for series-resonant converters

    NARCIS (Netherlands)

    Haan, de S.W.H.; Huisman, H.

    1985-01-01

    A series-resonant converter (SRC) able to generate an output voltage either lower or higher than the source voltage is described. Moreover, a novel control scheme is presented which renders two degrees of freedom for control and which guarantees symmetrical steady-state waveforms in all operation

  10. IMP-J attitude control prelaunch analysis and operations plan

    Science.gov (United States)

    Hooper, H. L.; Mckendrew, J. B.; Repass, G. D.

    1973-01-01

    A description of the attitude control support being supplied for the Explorer 50 mission is given. Included in the document are descriptions of the computer programs being used to support attitude determination, prediction, and control for the mission and descriptions of the operating procedures that will be used to accomplish mission objectives.

  11. Prospects and requirements for an operational modelling unit in flood crisis situations

    Directory of Open Access Journals (Sweden)

    Anders Katharina

    2016-01-01

    Full Text Available Dike failure events pose severe flood crisis situations on areas in the hinterland of dikes. In recent decades the importance of being prepared for dike breaches has been increasingly recognized. However, the pre-assessment of inundation resulting from dike breaches is possible only based on scenarios, which might not reflect the situation of a real event. This paper presents a setup and workflow that allows to model dike breachinduced inundation operationally, i.e. when an event is imminent or occurring. A comprehensive system setup of an operational modelling unit has been developed and implemented in the frame of a federal project in Saxony-Anhalt, Germany. The modelling unit setup comprises a powerful methodology of flood modelling and elaborated operational guidelines for crisis situations. Nevertheless, it is of fundamental importance that the modelling unit is instated prior to flood events as a permanent system. Moreover the unit needs to be fully integrated in flood crisis management. If these crucial requirements are met, a modelling unit is capable of fundamentally supporting flood management with operational prognoses of adequate quality even in the limited timeframe of crisis situations.

  12. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  13. Units for on-line control with the ES computer in physical investigations

    International Nuclear Information System (INIS)

    Efimov, L.G.

    1983-01-01

    The peripheral part of complex of means created for organization of ES computer operation on-line with experimental devices, comprising two units is described. The first unit is employed as a part of a universal driver of the Camac branch for connection with microprogram ES computer channel controller and ensures multioperational (up to 44 record varieties) device software service. The bilateral data exchange between the device and computer can be performed by bytes as well as 16 or 24-digit words using CAMAC group modes and with maximum rate of 1.25 Mbyte/s. The second unit is meant for synchronization of the data aquisition process with the device starting system and for ensuring the device operator dialogue with the computer

  14. Development of field simulator to test and qualify the gyrotron local control unit for ITER-India Gyrotron Test Facility

    International Nuclear Information System (INIS)

    Shah, Ronak; Mandge, Deepak; Rathod, Vipal; Parmar, Rajvi; Dilip, E. Sharan; Yadav, Amit; Sharma, Anjali; Rao, S.L.

    2017-01-01

    High power RF sources such as a Gyrotron system are operated at required output parameter by using various auxiliary power supplies, High voltage power supplies, auxiliary services and a dedicated Local Control Unit (LCU). These sub-systems must be operated in synchronous and safe way to control the gyrotron output parameters. The LCU performs remote, synchronous and safe operation of the all the gyrotron sub-systems. Broadly the LCU functions are operational control, data acquisition, protection and safety of the gyrotron system. At ITER-India gyrotron Test Facility (IIGTF) a local control unit (LCU) is being developed to operate the complete gyrotron system. This paper presents the design, development and various features of the field simulator. It also discuss LCU functionality test cases and results obtained using field simulator

  15. Quality control of diagnostic x-ray units

    International Nuclear Information System (INIS)

    Marinkovic, O.; Milacic, S.; Jovicic, D.; Tanaskovic, I.

    2001-01-01

    The quality control program for diagnostic x-ray units has started at the Institute of Occupational and Radiological Health during 1990. It includes, among other measurements, reproducibility of dose, high voltage and exposure time. Dose reproducibility was less than 5% for 70% of tested x-ray units. The exposure time and high voltage reproducibility were less than 5% in 60% cases. The cassettes with amplifying foils made from components of rare earth are used in 10% of all x-ray departments. It is very important to work as much as it is possible to modernize general infrastructure as the radiological protection of patients would be better. (author)

  16. Nuclear material control and accounting safeguards in the United States

    International Nuclear Information System (INIS)

    Woltermann, H.A.; Rudy, C.R.; Rakel, D.A.; DeVer, E.A.

    1982-01-01

    Material control and accounting (MC and A) of special nuclear material (SNM) must supplement physical security to protect SNM from unlawful use such as terrorist activities. This article reviews MC and A safeguards of SNM in the United States. The following topics are covered: a brief perspective and history of MC and A safeguards, current MC and A practices, measurement methods for SNM, historical MC and A performance, a description of near-real-time MC and A systems, and conclusions on the status of MC and A in the United States

  17. Lithium-Ion Cell Charge-Control Unit Developed

    Science.gov (United States)

    Reid, Concha M.; Manzo, Michelle A.; Buton, Robert M.; Gemeiner, Russel

    2005-01-01

    A lithium-ion (Li-ion) cell charge-control unit was developed as part of a Li-ion cell verification program. This unit manages the complex charging scheme that is required when Li-ion cells are charged in series. It enables researchers to test cells together as a pack, while allowing each cell to charge individually. This allows the inherent cell-to-cell variations to be addressed on a series string of cells and reduces test costs substantially in comparison to individual cell testing.

  18. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  19. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  20. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit