WorldWideScience

Sample records for twca operable unit

  1. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  2. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  3. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  4. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  5. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  6. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  7. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  8. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  9. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  10. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  11. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  12. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  13. 200-BP-5 operable unit treatability test report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  14. 200-BP-5 operable unit treatability test report

    International Nuclear Information System (INIS)

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  15. 2014 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2016-05-01

    Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...

  16. Analysis of Serbian Military Riverine Units Capability for Participation in the United Nations Peacekeeping Operations

    Directory of Open Access Journals (Sweden)

    Slobodan Radojevic

    2017-06-01

    Full Text Available This paper analyses required personnel, training capacities and equipment for participation in the United Nations peacekeeping operations with the riverine elements. In order to meet necessary capabilities for engagement in United Nations peacekeeping operations, Serbian military riverine units have to be compatible with the issued UN requirements. Serbian Armed Forces have the potential to reach such requirements with the River Flotilla as a pivot for the participation in UN missions. Serbian Military Academy adopted and developed educational and training program in accordance with the provisions and recommendations of the IMO conventions and IMO model courses. Serbian Military Academy has opportunities for education and training military riverine units for participation in the United Nations peacekeeping operations. Moreover, Serbia has Multinational Operations Training Center and Peacekeeping Operations Center certified to provide selection, training, equipping and preparations of individuals and units to the United Nations multinational operations.

  17. UNITED STATES SPECIAL OPERATIONS FORCES IN AFRICA

    Science.gov (United States)

    2016-02-16

    hundreds of traditional African religions associated with the plethora of tribal groups as well as large populations of Muslims, primarily in the...engagement, and the complexities of the African continent, Special Operations Forces (SOF) are uniquely suited to further those interests. Additionally...protecting access to abundant strategic resources, fostering integration into the global economy, and empowering Africans and their partners to deal

  18. Operational experience in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1977-01-01

    In the UK there are 26 Magnox reactors and 4 AGRs operating on 11 licensed sites; a further 6 AGRs are under construction on 2 additional and one of the existing sites. The arrangements by which the Nuclear Installations Inspectorate, on behalf of the Health and Safety Executive, carries out its regulatory functions at operating nuclear power plants are described. The range of activities undertaken is described with special reference being made to the biennial shutdowns for approved maintenance and inspections which are required by conditions attached to the site licence. The other means by which the continuing safety of these power reactors is assured are explained and include the relationship with the licensee's own Nuclear Safety Committee, approved arrangements for modifications to plant systems or components which have importance for safety and long term reviews of safety aspects. (author)

  19. Unit costs of waste management operations

    International Nuclear Information System (INIS)

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  20. Fast reactor operation in the United States

    International Nuclear Information System (INIS)

    Smith, R.R.; Cissel, D.W.

    1978-01-01

    Of the many American facilities dedicated to fast reactor technology, six qualify as liquid-metal-cooled fast reactors. All of these satisfy the following criteria: an unmoderated neutron spectrum, highly enriched fuel material, substantial heat production, and the use of a liquid metal coolant. These include the following: EBR-I Clementine, LAMPRE, EBR-II, EFFBR, and SEFOR. Collectively, these facilities encompassed all of the more important features of liquid-metal-cooled fast reactor technology. Coolant types ranged from mercury in Clementine, to NaK in EBR-I, and sodium in the others. Fuels included enriched-uranium metallic alloys in EBR-I, EBR-II, and EFFBR; metallic plutonium in Clementine; molten plutonium alloy in LAMPRE; and a mixed UO 2 -PuO 2 ceramic in SEFOR. Heat removal techniques ranged from air-blast cooling in LAMPRE and SEFOR; steam-electrical generation in EBR-I, EBR-II, and EFFBR; to a mercury-to-water heat dump in Clementine. Operational experience with such diverse systems has contributed heavily to the U.S. Each of the six systems is described from the viewpoints of purpose, history, design, and operation. Attempts are made to limit descriptive material to the most important features and to refer the reader to a few select references if additional information is needed

  1. Analysis of operating reliability of WWER-1000 unit

    International Nuclear Information System (INIS)

    Bortlik, J.

    1985-01-01

    The nuclear power unit was divided into 33 technological units. Input data for reliability analysis were surveys of operating results obtained from the IAEA information system and certain indexes of the reliability of technological equipment determined using the Bayes formula. The missing reliability data for technological equipment were used from the basic variant. The fault tree of the WWER-1000 unit was determined for the peak event defined as the impossibility of reaching 100%, 75% and 50% of rated power. The period was observed of the nuclear power plant operation with reduced output owing to defect and the respective time needed for a repair of the equipment. The calculation of the availability of the WWER-1000 unit was made for different variant situations. Certain indexes of the operating reliability of the WWER-1000 unit which are the result of a detailed reliability analysis are tabulated for selected variants. (E.S.)

  2. An Appraisal Of The Operation And Management Of Unit Trust ...

    African Journals Online (AJOL)

    An Appraisal Of The Operation And Management Of Unit Trust Schemes In Nigeria. ... Open Access DOWNLOAD FULL TEXT ... instead of being invested in shares or in money market instruments as a result of widespread financial illiteracy.

  3. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  4. Stability Analysis for Operation of DG Units in Smart Grids

    DEFF Research Database (Denmark)

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  5. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  6. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10 -5

  7. Feasibility study report for the 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 10 5

  8. Feasibility study report for the 200-BP-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  9. Integrated Ground Operations Demonstration Units Testing Plans and Status

    Science.gov (United States)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  10. 200-UP-2 Operable Unit technical baseline report

    International Nuclear Information System (INIS)

    Deford, D.H.

    1991-02-01

    This report is prepared in support of the development of a Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the 200-UP-2 Operable Unit by EBASCO Environmental, Incorporated. It provides a technical baseline of the 200-UP-2 Operable Unit and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The 200-UP-2 Operable Unit Technical Baseline Report is based on review and evaluation of numerous Hanford Site current and historical reports, Hanford Site drawings and photographs and is supplemented with Hanford Site inspections and employee interviews. No field investigations or sampling were conducted. Each waste site in the 200-UP-2 Operable Unit is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. The 200-UP-2 Operable Unit consists of liquid-waste disposal sites in the vicinity of, and related to, U Plant operations in the 200 West Area of the Hanford Site. The ''U Plant'' refers to the 221-U Process Canyon Building, a chemical separations facility constructed during World War 2. It also includes the Uranium Oxide (UO 3 ) Plant, which was constructed at the same time and, like the 221-U Process Canyon Building, was later converted for other missions. Waste sites in the 200-UP-2 Operable Unit are associated with the U Plant Uranium Metal Recovery Program mission that occurred between 1952 and 1958 and the UO 3 Plant's ongoing uranium oxide mission and include one or more cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, waste vaults, and the lines and encasements that connect them. 11 refs., 1 tab

  11. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  12. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  13. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  14. Operational behaviour of WWER nuclear power units after Chernobyl accident

    International Nuclear Information System (INIS)

    Milivojevic, S.; Spasojevic, D.

    2000-01-01

    The indicators of effectiveness of WWER operation, in 1987-1998 were analyzed. For three groups of nuclear units (WWER, NPP Kozloduy, NPP Paks), the trends of Indicators flow were established. The comparative analysis of forced outage rate, and load factor of WWERs and nuclear units all in the world was carried out; it gives the general picture of accident influence on the states and the relations of these indicators in considered period (author)

  15. On Point: The United States Army in Operation Iraqi Freedom

    Science.gov (United States)

    2004-01-01

    to retain operational context. Moreover, times noted in the text have been adjusted from Greenwich Mean Time (“ Zulu ”) to local Kuwait time (+ 3...TF 1-64 AR unit history is composed of short narratives for each subordinate unit. Most cite times in zulu . 34. Ibid. 35. Ibid. Numbers of enemy...places in the world. Inside the city cemetery is the Tomb of Ali, son-in-law and cousin to Mohammed and founder of the Shiite sect. Coalition leaders

  16. 200-BP-5 operable unit Technical Baseline report

    International Nuclear Information System (INIS)

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  17. Implementation of Active Learning Method in Unit Operations II Subject

    OpenAIRE

    Ma'mun, Sholeh

    2018-01-01

    ABSTRACT: Active Learning Method which requires students to take an active role in the process of learning in the classroom has been applied in Department of Chemical Engineering, Faculty of Industrial Technology, Islamic University of Indonesia for Unit Operations II subject in the Even Semester of Academic Year 2015/2016. The purpose of implementation of the learning method is to assist students in achieving competencies associated with the Unit Operations II subject and to help in creating...

  18. Operational safety experience reporting in the United States

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1978-01-01

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  19. Adaptation of Professional Skills in the Unit Operations Laboratory

    Science.gov (United States)

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  20. Pressure Swing Adsorption in the Unit Operations Laboratory

    Science.gov (United States)

    Ganley, Jason

    2018-01-01

    This paper describes a student laboratory in the Unit Operations Laboratory at the Colorado School of Mines: air separation by pressure swing adsorption. The flexibility of the system enables students to study the production of enriched nitrogen or oxygen streams. Automatic data acquisition permits the study of cycle steps and performance.…

  1. Basewide Groundwater Operable Unit. Groundwater Operable Unit Remedial Investigation/Feasibility Study Report. Volume 1

    Science.gov (United States)

    1994-06-01

    units would be reused in the remedy. Contingency measures to be included in the remedy are potential metals removal prior to water end use, potential...onbase reuse of a portion of the water, and wellhead treatment on offbase supply wells. The contingency measures will only be implemented if necessary...94 LEGEND Ouatmar aluvi dposts agua Frmaion(cosoldatd aluval epoits W iead rdetilnsMhte omtin(neitccnlmeae ansoe9ndkeca F 70 Quvatei-lernayalvu e pk

  2. Thunderstorm Algorithm for Determining Unit Commitment in Power System Operation

    Directory of Open Access Journals (Sweden)

    Arif Nur Afandi

    2016-12-01

    Full Text Available Solving the unit commitment problem is an important task in power system operation for deciding a balanced power production between various types of generating units under technical constraints and environmental limitations. This paper presents a new intelligent computation method, called the Thunderstorm Algorithm (TA, for searching the optimal solution of the integrated economic and emission dispatch (IEED problem as the operational assessment for determining unit commitment. A simulation using the IEEE-62 bus system showed that TA has smooth convergence and is applicable for solving the IEED problem. The IEED’s solution is associated with the total fuel consumption and pollutant emission. The proposed TA method seems to be a viable new approach for finding the optimal solution of the IEED problem.

  3. Optimal operation of cogeneration units. State of art and perspective

    International Nuclear Information System (INIS)

    Polimeni, S.

    2001-01-01

    Optimal operation of cogeneration plants and of power plant fueling waste products is a complex challenge as they have to fulfill, beyond the contractual obligation of electric power supply, the constraints of supplying the required thermal energy to the user (for cogeneration units) or to burn completely the by-products of the industrial complex where they are integrated. Electrical power market evolution is pushing such units to a more and more volatile operation caused by uncertain selling price levels. This work intends to pinpoint the state of art in the optimization of these units outlining the important differences among the different size and cycles. The effect of the market liberalization on the automation systems and the optimization algorithms will be discussed [it

  4. Centrifugal microfluidic platforms: advanced unit operations and applications.

    Science.gov (United States)

    Strohmeier, O; Keller, M; Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N

    2015-10-07

    Centrifugal microfluidics has evolved into a mature technology. Several major diagnostic companies either have products on the market or are currently evaluating centrifugal microfluidics for product development. The fields of application are widespread and include clinical chemistry, immunodiagnostics and protein analysis, cell handling, molecular diagnostics, as well as food, water, and soil analysis. Nevertheless, new fluidic functions and applications that expand the possibilities of centrifugal microfluidics are being introduced at a high pace. In this review, we first present an up-to-date comprehensive overview of centrifugal microfluidic unit operations. Then, we introduce the term "process chain" to review how these unit operations can be combined for the automation of laboratory workflows. Such aggregation of basic functionalities enables efficient fluidic design at a higher level of integration. Furthermore, we analyze how novel, ground-breaking unit operations may foster the integration of more complex applications. Among these are the storage of pneumatic energy to realize complex switching sequences or to pump liquids radially inward, as well as the complete pre-storage and release of reagents. In this context, centrifugal microfluidics provides major advantages over other microfluidic actuation principles: the pulse-free inertial liquid propulsion provided by centrifugal microfluidics allows for closed fluidic systems that are free of any interfaces to external pumps. Processed volumes are easily scalable from nanoliters to milliliters. Volume forces can be adjusted by rotation and thus, even for very small volumes, surface forces may easily be overcome in the centrifugal gravity field which enables the efficient separation of nanoliter volumes from channels, chambers or sensor matrixes as well as the removal of any disturbing bubbles. In summary, centrifugal microfluidics takes advantage of a comprehensive set of fluidic unit operations such as

  5. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  6. Radioactive acid digestion test unit nonradioactive startup operations

    International Nuclear Information System (INIS)

    Allen, C.R.; Cowan, R.G.; Crippen, M.D.; Divine, J.R.

    1978-05-01

    The Radioactive Acid Digestion Test Unit (RADTU) will process 5 kg/hour of combustible solid waste and is designed to handle almost all solid combustible waste found in plutonium processing with plutonium contamination levels up to scrap. The RADTU is designed with special safety features to safely contain high masses of fissile materials and to safely handle unusual materials and reactive chemicals which may find their way into the waste. Nonradioactive operating experience to date has been very satisfactory. RADTU has been operated for extended runs on both a 24-hour per day basis as well as on a one shift per day basis. Some minor operating problems have been encountered as expected in a shakedown operation. In general, solutions to these have been readily found. 12 figures

  7. Advanced Transport Operating System (ATOPS) control display unit software description

    Science.gov (United States)

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  8. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    International Nuclear Information System (INIS)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-01-01

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  9. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  10. 100-KR-1 Operable Unit focused feasibility study report

    International Nuclear Information System (INIS)

    1994-11-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives and the detailed analysis of alternatives. This focused feasibility study (FFS) was conducted for the 100-KR-1 Operable Unit at the Hanford Site in southeastern Washington. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the five sites (116-K-1 crib, 116-K-2 trench, 116-KE-4 and 116-KW-3 retention basins, and process effluent pipelines) associated with the 100-KR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste site. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  11. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  12. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  13. Heat recovery unit operation of HVAC system in IMEF

    International Nuclear Information System (INIS)

    Paek, S. R.; Oh, Y. W.; Song, E. S.; Park, D. K.; Joo, Y. S.; Hong, K. P.

    2003-01-01

    HVAC system including a supply and exhaust air system in IMEF(Irradiated Materials Examination Facility) is an essential facility for preventing a leakage of radioactive materials and for a preservation of a working environment. It costs a lot to operate the HVAC system in IMEF because our ventilation type is once-through system, and an air flow is maintained from low level contamination area to high level and maintained high turns of ventilation air under certain conditions. As HRU(Heat Recovery Unit) at HVAC system based on PIEF(Post Irradiation Examination Facility) operation experiences is designed and adopted, it prevents from a heating coil freezing destruction in winter and makes much energy saving etc.. Heat pipe type HRU is adopted in IMEF, and a construction and operation result of HRU is examined

  14. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  15. The quality of operative notes at a general surgery unit.

    Science.gov (United States)

    Rogers, A; Bunting, M; Atherstone, A

    2008-09-01

    With the increasingly litigious nature of medical practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in a general surgery unit in order to improve our practice. An audit of 100 consecutive operative notes was performed, and notes were assessed using the Royal College of Surgeons guidelines. The quality of note-taking of trainees was compared with that of consultant surgeons. A series of operation note pro formas was designed in response to the findings. Of the notes, 66% were completed by trainees. The vast majority of notes had no diagram to demonstrate the surgical findings or illustrate the actions. Specialist surgeons were more likely to describe the actions accurately, but less likely to describe wound closure methods or dressings used. They were also less likely to complete adequate postoperative orders. This study identifies key areas of weakness in our operative note-keeping. Pro formas should be introduced and made available for commonly performed procedures, and diagrams should be used wherever possible.

  16. Feasibility study report for Operable Unit 4: Volume 1

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP

  17. Feasibility study report for Operable Unit 4: Volume 2

    International Nuclear Information System (INIS)

    1994-02-01

    This report documents the Feasibility Study (FS) phase of the Fernald Environmental Management Project (FEMP) Operable Unit 4 Remedial Investigation/Feasibility Study (RI/FS) Program. The FEMP, formerly known as the Feed Materials Production Center (FMPC), is a US Department of Energy (DOE) facility that operated from 1952 to 1989. The facility's primarily function was to provide high purity uranium metal products to support United States defense programs. Production operations were suspended in 1989 to focus on environmental restoration and waste management activities at the facility. The RI/FS is being conducted pursuant to the terms of a Consent Agreement between DOE and the US Environmental Protection Agency (EPA) under Sections 120 and 106(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. The Ohio Environmental Protection Agency (OEPA) is also participating in the RI/FS process at the FEMP through direct involvement in program review meetings and technical review of project documentation. The objective of the RI/FS process is to gather information to support an informed risk management decision regarding which remedy appears to be the most appropriate action for addressing the environmental concerns identified at the FEMP. This volume contains appendices A--E

  18. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  19. The role of heat pipes in intensified unit operations

    International Nuclear Information System (INIS)

    Reay, David; Harvey, Adam

    2013-01-01

    Heat pipes are heat transfer devices that rely, most commonly, on the evaporation and condensation of a working fluid contained within them, with passive pumping of the condensate back to the evaporator. They are sometimes referred to as ‘thermal superconductors’ because of their exceptionally high effective thermal conductivity (substantially higher than any metal). This, together with several other characteristics make them attractive to a range of intensified unit operations, particularly reactors. The majority of modern computers deploy heat pipes for cooling of the CPU. The application areas of heat pipes come within a number of broad groups, each of which describes a property of the heat pipe. The ones particularly relevant to chemical reactors are: i. Separation of heat source and sink. ii. Temperature flattening, or isothermalisation. iii. Temperature control. Chemical reactors, as a heat pipe application area, highlight the benefits of the heat pipe based on isothermalisation/temperature flattening device and on being a highly effective heat transfer unit. Temperature control, done passively, is also of relevance. Heat pipe technology offers a number of potential benefits to reactor performance and operation. The aim of increased yield of high purity, high added value chemicals means less waste and higher profitability. Other intensified unit operations, such as those employing sorption processes, can also profit from heat pipe technology. This paper describes several variants of heat pipe and the opportunities for their use in intensified plant, and will give some current examples. -- Highlights: ► Heat pipes – thermal superconductors – can lead to improved chemical reactor performance. ► Isothermalisation within a reactor vessel is an ideal application. ► The variable conductance heat pipe can control reaction temperatures within close limits. ► Heat pipes can be beneficial in intensified reactors

  20. Feasibility Study for Operable Unit 7-13/14

    International Nuclear Information System (INIS)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-01-01

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  1. Feasibility Study for Operable Unit 7-13/14

    Energy Technology Data Exchange (ETDEWEB)

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  2. Article separation apparatus and method for unit operations

    Science.gov (United States)

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  3. Risk-based decision analysis for groundwater operable units

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1995-01-01

    This document proposes a streamlined approach and methodology for performing risk assessment in support of interim remedial measure (IRM) decisions involving the remediation of contaminated groundwater on the Hanford Site. This methodology, referred to as ''risk-based decision analysis,'' also supports the specification of target cleanup volumes and provides a basis for design and operation of the groundwater remedies. The risk-based decision analysis can be completed within a short time frame and concisely documented. The risk-based decision analysis is more versatile than the qualitative risk assessment (QRA), because it not only supports the need for IRMs, but also provides criteria for defining the success of the IRMs and provides the risk-basis for decisions on final remedies. For these reasons, it is proposed that, for groundwater operable units, the risk-based decision analysis should replace the more elaborate, costly, and time-consuming QRA

  4. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  5. Operational aerial snow surveying in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Peck, E L; Carroll, T R; Vandemark, S C

    1980-03-01

    An airborne gamma radiation detector and data acquisition system has been designed for rapid measurement of the snow cover water equivalent over large open areas. Research and field tests conducted prior to the implementation of an operational snow measurement system in the United States are reviewed. Extensive research test flights were conducted over large river basins of the north-central plains and in the high mountain valleys of the inter-mountain West. Problems encountered during development include: (1) error in the gross gamma flux produced by atmospheric radon gas daughters; (2) spatial and temporal variability in soil moisture; and (3) errors in gamma radiation count rate introduced by aircraft and cosmic background radiation. Network design of operational flight line and ground observation data used in a river forecasting system are discussed. 22 references, 4 figures, 2 tables.

  6. 100-BC-1 Operable Unit focused feasibility study

    International Nuclear Information System (INIS)

    Day, R.E.

    1994-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act feasibility study includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study constitutes the Phase 3 portion of the feasibility study process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The focused feasibility study process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific focused feasibility study document, such as this one. The focused feasibility study process is performed by implementing a ''plug-in'' style approach; as defined in greater detail in the Process Document, which is a companion to this document. The objective of this focused feasibility study is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures for candidate waste sites associated with the 100-BC-1 Operable Unit which is located in the north-central part of the Hanford Site. The interim remedial measure candidate waste sites are determined in the Limited Field Investigation (DOE-RL 1993b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  7. Explanation of significant differences for the TNX groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1997-01-01

    This Explanation of Significant Differences (ESD) is being issued by the Department of Energy (DOE), the lead agency for the Savannah River Site (SRS), with concurrence by the Environmental Protection Agency-Region IV (EPA) and South Carolina Department of Health and Environmental Control (SCDHEC) to announce changes in the interim remediation strategy selected for the TNX Groundwater Operable Unit. The TNX Area is located adjacent to the Savannah River in the southwestern portion of SRS. The remedy selected in the Interim Record of Decision (IROD) to achieve the interim action goals was the Hybrid Groundwater Corrective Action (HGCA). The HGCA consisted of a recirculation well system and an air stripper with a series of groundwater extraction wells. The original remediation strategy needs to be modified because the recirculation well system was determined to be ineffective in this area due to geological factors and the nature of the contamination

  8. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  9. Operation of the radioactive acid digestion test unit

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1980-01-01

    The Radioactive Acid Digestion Test Unit (RADTU) has been constructed at Hanford to demonstrate the application of the Acid Digestion Process for treating combustible transuranic wastes and scrap materials. The RADTU with its original tray digestion vessel has recently completed a six-month campaign processing potentially contaminated nonglovebox wastes from a Hanford plutonium facility. During this campaign, it processed 2100 kg of largely cellulosic wastes at an average sustained processing rate of 3 kg/h as limited by the water boiloff rate from the acid feeds. The on-line operating efficiency was nearly 50% on a twelve hour/day, five day/week basis. Following this campaign, a new annular high rate digester has been installed for testing. In preliminary tests with simulated wastes, the new digester demonstrated a sustained capacity of 10 kg/h with greatly improved intimacy of contact between the digestion acid and the waste. The new design also doubles the heat transfer surface, which with reduced heat loss area, is expected to provide at least three times the water boiloff rate of the previous tray digester design. Following shakedown testing with simulated and low-level wastes, the new unit will be used to process combustible plutonium scrap and waste from Hanford plutonium facilities for the purposes of volume reduction, plutonium recovery, and stabilization of the final waste form

  10. 77 FR 62247 - Dynamic Positioning Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units...

    Science.gov (United States)

    2012-10-12

    ... Operations Guidance for Vessels Other Than Mobile Offshore Drilling Units Operating on the U.S. Outer... ``Mobile Offshore Drilling Unit Dynamic Positioning Guidance''. The notice recommended owners and operators of Mobile Offshore Drilling Units (MODUs) follow Marine Technology Society (MTS) Dynamic Positioning...

  11. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  12. 100-HR-2 Operable Unit Focused Feasibility study report

    International Nuclear Information System (INIS)

    1995-01-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Feasibility Study (FS) includes development and screening of alternatives (Phases 1 and 2) and the detailed analysis of alternatives (Phase 3). This focused feasibility study (FFS) was conducted for the 100-HR-2 Operable Unit (OU) at the Hanford Site in southeastern Washington. This FFS constitutes the Phase 3 portion of the FS process for the remedial alternatives initially developed and screened in the 100 Area Feasibility Study Phases 1 and 2 (DOE-RL 1993a). The objective of this OU-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for the seven IRM candidate sites associated with the 100-HR-2 OU. The IRM candidate waste sites identified in Table ES-1 are determined in the limited field investigation (DOE-RL 1994b). Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented. A summary for the 100-HR-2 IRM candidate waste site is as follows: none of the waste sites require additional alternative development. six of the seven waste sites directly plug into the waste site group alternatives. The site-specific detailed analysis is conducted, referencing the waste site group analysis as appropriate. A waste site detailed analysis summary is presented in Table ES-1.A comparative analysis of remedial alternatives is presented for each waste site. A summary of the comparative analysis is presented in Table ES-2

  13. Operator support system for power unit control in abnormal modes of operation

    International Nuclear Information System (INIS)

    Kurka, J.

    1993-01-01

    I and C system technology, partly Soviet and partly Czechoslovakian, used on the NPP Dukovany units represents the control technology standard of late 70-ties and it becomes the weak part of the whole system. The modernization of the system, therefore, is necessary and it is already in preparation. The specification of both the scope and the depth of upgrading/replacement is being carried out within the framework of the PHARE program. The second phase of the program aimed at the final specifications of requirements on new I and C system is in progress. The output will serve as detailed specification for bid invitation for control system supplier. Parallely, the preparation of specification for WWER-440 full-scope plant simulator for operator training is in progress as well. In the case of two units with WWER-1000 MW reactors, the completion of construction of which was even threaten for a certain period of time, essential changes have taken place in the design of both the I and C systems and the reactor core. 7 figs

  14. 40 CFR 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking...

    Science.gov (United States)

    2010-07-01

    ..., Catalytic Reforming Units, and Sulfur Recovery Units. (iii) The owner or operator shall install, operate... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and...

  15. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  16. 2016 Highlights of Ferry Operations in the United States

    Science.gov (United States)

    2017-10-01

    This publication highlights data collected by the 2016 NCFO. The Bureau of Transportation Statistics (BTS) conducted the NCFO from April through November 2016, collecting the operational characteristics of the 2015 calendar year ferry operations.

  17. Unit information system operational displays for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Anikanov, S.S.; Carrera, J.P.; Gordon, P.

    1997-01-01

    The role of high level operational displays is explained as well as the principles of the design of such displays. The tasks of WWER operating personnel are described and the support provided by operational displays is highlighted. The architecture of the displays is also dealt with. (A.K.)

  18. United States Military in Central Asia: Beyond Operation Enduring Freedom

    Science.gov (United States)

    2009-10-23

    Malinowski , advocacy director for Human Rights Watch, stated, “the United States is most effective in promoting liberty around the world when people...26 U.S. President, The National Security Strategy of the United States of America, page? 27 Thomas Malinowski , “Testimony

  19. Operative training in otolaryngology in the United Kingdom: a specialist registrar survey

    NARCIS (Netherlands)

    Georgalas, Christos; Hadjihannas, Edward; Ghufoor, Khalid; Pracy, Paul; Papesch, Michael

    2005-01-01

    OBJECTIVE: To assess the current status of operative training for otolaryngology specialist registrars in the United Kingdom. DESIGN: Web-based questionnaire survey. PARTICIPANTS: All otolaryngology specialist registrars in the United Kingdom. MAIN OUTCOME MEASURES: The overall satisfaction with

  20. How Can the United States Army Improve Human Intelligence in Peace Operations?

    National Research Council Canada - National Science Library

    Wright, David

    2003-01-01

    .... These secondary collectors, such as the Military Police, Psychological Operations, Civil Affairs and Line Units conduct liaison with international and local police forces, host-government official...

  1. USE OF ELECTRONIC CASE HISTORIES IN OPERATION OF MEDICAL UNITS

    Directory of Open Access Journals (Sweden)

    I. B. Boltenkova

    2016-01-01

    Full Text Available Introduction of electronic case histories to medical units including TB units is one of the factors allowing enhancing quality of medical care provision. Use of the electronic case histories provides conditions for information transparency improvement in a medical unit: financial, statistic and medico-technological. Information contained in the electronic case history is important and required both for internal and external use. Use of electronic case histories contributes to reduction of labor costs of workers in medical units, provides fast access of medical personnel to information, formalizes data, provides preservation, invariance and reliability of the information entered into electronic case history during the whole period of storage, regulates the access rights and confidentiality, personifies data and allows unifying health data of all Russian population into one pool.

  2. Design and operation of gas-heated thermal pumping units

    Energy Technology Data Exchange (ETDEWEB)

    Rostek, H A [Ruhrgas A.G., Essen (Germany, F.R.)

    1979-03-01

    The first gas heat pump systems have been operated since spring 1977. These are applied in living houses, school, swimming pools, and sport places and administration buildings. The heating performance of these systems is 150-3800 kW. Two of these systems, one in a swimming pool and one in a house for several families are operating, each of them for one heating period. The operational experiences with these gas heat pumps are reported on, basing on measurement results. The experience gathered from the operation of gas heat pumps systems is applied to the planning of other plants. The development of a standardized gas heat pump-series is emphasized.

  3. Operational test procedure for SY tank farm replacement exhauster unit

    International Nuclear Information System (INIS)

    McClees, J.

    1995-01-01

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  4. BN-600 power unit 15-year operating experience

    International Nuclear Information System (INIS)

    Saraev, O.M.; Oshkanov, N.N.; Vylomov, V.V.

    1996-01-01

    Comprehensive experience has been gained with the operating fast reactor BN-600 with a power out of 600 MWe. This paper includes important performance results and gives also an overview of the experience gained from BN-600 NPP commercial operation during 15 years. (author). 2 figs, 1 tab

  5. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  6. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    International Nuclear Information System (INIS)

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  7. Information Operations: Countering the Asymmetric Threat to the United States

    National Research Council Canada - National Science Library

    McKeown, Wendell

    1999-01-01

    .... The cornerstone of Joint Vision 2010 is information superiority. Every facet of future military operations will be critically linked to an aggregate cyber network that relies on critical national infrastructures to provide for information superiority...

  8. An Examination of the United States Air Service's Logistics Operations

    National Research Council Canada - National Science Library

    Hunt, Andrew

    1998-01-01

    This historical study details the U.S. Air Service's logistics operations at home and abroad in an attempt to determine the relationship between the process and more recently established logistic principles...

  9. 7 CFR 631.22 - Access to operating unit.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Miscellaneous § 631.22... unit for the purpose of ascertaining the accuracy of any representations made in a contract or leading up to a contract, and as to the performance of the terms and conditions of the contract. Access shall...

  10. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  11. Survey method for radiological surveys of 300 FF-1 Operable Unit soil and materials

    International Nuclear Information System (INIS)

    Greif, A.A.

    1997-06-01

    This technical basis document is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by the Radiological Control Technician to determine if excavated areas require continued remediation in accordance with the Record of Decision for the operable unit

  12. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  13. Increasing the flexibility of base-load generating units in operation on fossil fuel

    Energy Technology Data Exchange (ETDEWEB)

    Girshfel' d, V Ya; Khanaev, V A; Volkova, E D; Gorelov, V A; Gershenkroi, M L

    1979-01-01

    Increasing the flexibility of base-load generating units operating on fossil fuel by modifying them is a necessary measure. The highest economic effect is attained with modification of gas- and oil-fired generating units in the Western United Power Systems of the European part of the SPSS. On the basis of available experience, 150- and 200-MW units can be extensively used to regulate the power in the European part of the SPSS through putting them into reserve for the hours of the load dip at night. The change under favorable conditions of 150- and 200-MW units operating on coal to a district-heating operating mode does not reduce the possibilities for flexible operation of these units because it is possible greatly to unload the turbines while the minimum load level of the pulverized fuel fired boiler is retained through transferring a part of the heat load to the desuperheater. It is necessary to accumulate and analyze experience with operation of generating units (especially of supercritical units) with regular shutdowns and starts of groups of units and to solve the problems of modification of generating units, with differentiation with respect to types of fuel and to the united power supply system.

  14. Twenty years of operation of WWER 440/230 units in Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Tomek, J.

    1998-01-01

    It is twenty years this year since the first unit WWER 440 of Slovak Nuclear Power Plant Jaslovske Bohunice was commissioned. There are four units WWER 440 in operation Jaslovske Bohunice site. First two units of older soviet PWR design V-230 (also known as V-1) and other two units of newer V-213 type (also known as V-2). The goal of this presentation is to summarize and evaluate the operation of Unit 1 and 2 for this period of time and mainly to describe what has been done and what is planned to be done to increase the nuclear safety and operational reliability of both units. The operating organization and regulatory authority assume that an internationally acceptable level of safety will be reached by accomplishing of the upgrading program.(author)

  15. AN OPERATIONAL MANAGEMENT MODEL FOR A COAL MINING PRODUCTION UNIT

    Directory of Open Access Journals (Sweden)

    R. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: The coal mining industry faces increased pressure for higher quality coal at lower cost and increased volumes. To satisfy these requirements the industry needs technically skilled first line supervisors with operational management skills. Most first line supervisors possess the necessary technical, but not the required operational management skills. Various operational management philosophies, describing world-class operational management practices exist; however, it is not possible to implement these philosophies as-is in a mining environment due to the various differences between manufacturing and mining. The solution is to provide an operational management model, adapted from these philosophies, to first line supervisors in the coal mining industry.

    AFRIKAANSE OPSOMMING: Die steenkoolmynbedryf ervaar groeiende druk van die mark vir hoër gehalte steenkool, laer koste en verhoogde volumes. Om hierdie behoefte te bevredig benodig die myn tegniesgeskoolde eerstelyntoesighouers met bedryfsbestuursvaardighede. Ongelukkig beskik die meeste toesighouers wel oor die nodige tegniese kennis, maar nie die nodige bedryfsbestuursvaardighede nie. Daar bestaan verskeie bedryfsbestuursfilosofieë wat wêreldklas bedryfsbestuurspraktyke omskryf. Dit is egter nie moontlik om die filisofieë net so in die mynbedryf te implimenteer nie a.g.v. die verskille tussen vervaardiging en mynbou. Die oplossing is om ‘n bedryfsbestuurmodel wat op hierdie filosofieë geskoei is, aan eerstelyntoesighouers in die steenkoolbedryf te verskaf.

  16. Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 successfully completed its first core cycle with unit availability of 95.2 percent. Saltwater leakage into the condenser continues to be a problem. Unit 2 achieved initial criticality November 30 and was initially paralleled to the Baltimore system on December 7. Information is presented concerning operations, specifications, maintenance, shutdowns and power reduction, and personnel exposures

  17. Operational challenges and opportunities in pastured poultry operations in the United States.

    Science.gov (United States)

    Elkhoraibi, C; Pitesky, M; Dailey, N; Niemeier, D

    2017-06-01

    As pastured poultry production has gained increased popularity in the United States in recent years, there is a growing need for research and outreach efforts aimed at this sector of poultry production. In order to get familiarized with American pastured poultry producers, we conducted an online questionnaire aimed primarily at evaluating what operational challenges are faced by producers and what educational opportunities should be initiated by researchers. Results showed that pastured poultry farms largely vary in total number of acres farmed and total number of birds kept. The vast majority of farms (96%) rotate their flocks on pasture and include livestock species (78%) in their rotation systems. Mobile coops are the preferred housing option provided by producers (88%). The most common source of mortality listed by respondents was predation (52%), followed by "other" (32%). However, predation was not selected as the most important challenge by the majority of respondents. Sixty-four percent of participants instead mentioned providing adequate feed at reasonable cost as the major challenge in raising poultry on pasture, followed again by "other" (52%) and lack of processing facilities for small numbers of birds (40%). Finally, the topics considered by respondents as the most helpful to learn more about were how to improve egg production rate and/or feed conversion ratio (67%), followed by how to improve pasture condition and optimum vegetative cover all year round (62%). Despite its small sample size, this study's results provide some valuable insights of challenges encountered and information needed on pastured poultry farms. © 2017 Poultry Science Association Inc.

  18. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electric power generated in 1975 was 1,074,401 MW(e) with the generator on line 4,680.7 hrs. Information is presented concerning operations, maintenance, radioactive effluents and waste shipments, health physics, shutdowns, and personnel exposures

  19. Startup operation of Browns Ferry's 1152-MW nuclear units

    International Nuclear Information System (INIS)

    Calhoun, J.R.; Green, H.J.; Beers, R.B.

    1975-01-01

    An overview is presented of startup operation for the Browns Ferry-1 reactor, and comparisons are made with the startup of Browns Ferry-2. Included are comments on the selection of the BWR type steam supply system, reactor fueling, problems encountered, and plant availability

  20. Brunswick Steam Electric Plant, Unit 2. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Initial criticality occurred in March and start-up testing continued for most of the year. Information is presented concerning operations, shutdowns, maintenance, design changes, personnel radiation exposures, thermal transients, safety/relief valve malfunctions, condenser tube leaks, and recirculation pump seal failures

  1. Pilgrim Nuclear Power Station, Unit 1. Annual operating report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,587,248 MWH(e) with the reactor on line 6,242.4 hr. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  2. Cognitive model of the power unit operator activity

    International Nuclear Information System (INIS)

    Chachko, S.A.

    1992-01-01

    Basic notions making it possible to study and simulate the peculiarities of man-operator activity, in particular his way of thiking, are considered. Special attention is paid to cognitive models based on concept of decisive role of knowledge (its acquisition, storage and application) in the man mental processes and activity. The models are based on three basic notions, which are the professional world image, activity strategy and spontaneous decisions

  3. Operations Research and the US (United States) Army

    Science.gov (United States)

    1983-04-07

    technology "developed more rapidly than it could be absorbed effectively into military tactics and strategy." 4 World War II is usually identified as...Corporation, was formed by the Air Force as a non-profit organization to provide technological advice. 7 By the early 1950’s the public recognized operations... enlight - ening. He recognized the important and clearly distinguishable roles played by the technical analyst and the military decision maker. The systems

  4. Cost and Operational Effectiveness Analysis of Aiternative Force Structures for Fulfillment of the United States Marine Corps Operational Support Airlift and Search and Rescue Missions

    National Research Council Canada - National Science Library

    Chase, Eric

    2000-01-01

    This thesis provides a preliminary cost and operational effectiveness analysis of alternative force structures for the United States Marine Corps operational support airlift and search and rescue missions...

  5. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  6. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping, surveying...

  7. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Energy Technology Data Exchange (ETDEWEB)

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  8. Operation of the radioactive acid-digestion test unit (RADTU)

    International Nuclear Information System (INIS)

    Blasewitz, A.G.; Allen, C.R.; Lerch, R.E.; Ely, P.C.; Richardson, G.L.

    1981-01-01

    At the Karlsruhe Nuclear Research Center, research and development work concerned with the acid digestion of combustible waste with high plutonium content is being carried out. The main objectives are the reduction of the waste volume, the recovery of the plutonium and the transformation of the process residues into a product suitable for final disposal. For this purpose an inactive demonstration plant with a throughput of 1.5 kg/h has been constructed. In the first version, the reactor of this plant was a tray reactor of the HEDL type. During test operations the sedimentation of a residue was observed on the tray. The density of this residue was higher than that of the residue suspended in the reaction acid. Experiments using tantalum oxide (D=8.4 g/cm 3 ) to simulate the plutonium oxide (D=11.5 g/cm 3 ) have verified this observation. This means that in active operation a sedimentation of plutonium oxide on the tray is to be expected. With respect to these results a new reactor was developed where the settling of the residue is avoided by appropriate design and high circulation velocity of the reaction acid. The reactor consists of a tube 50-80 mm in diameter, which is curved to form a closed loop with an arm length of about 1x1 m. Since October 1979 this ring reactor has been under inactive test operation. Its behaviour is very stable. The velocity of the reaction acid in the heater is 0.5-1 m/s. A settling of residues or tantalum oxide has not been observed. The throughput attained is comparable to that of the tray reactor but the space requirement is three times smaller, and the volume of the reaction acid four times smaller. (author)

  9. Radioprotection in the operation of accelerator and plasma units

    International Nuclear Information System (INIS)

    Ewen, K.

    1984-01-01

    Relatively great problems of radioprotection can be caused by accelerator units, above all in the field of science, because all kinds of ionizing radiation and radioactive substances can be produced in all stages of aggregation. Furthermore, activities with relatively long half-lifes are induced by high particle streams with energies beyond the thresholds of many nuclear reations, to that the conditions of a control zone, even of a prohibited zone exist at many points after having switched off the accelerator. Not all of these radioprotective problems can be solved by constructive or technical measures. A sufficient skill of the persons responsible for radioprotection is very important in this connection. Efficient radioprotective measures are only possible by a close cooperation between the radiation protection officer, the competent authority, and the expert. (orig.) [de

  10. United Kingdom: Procurement Related Nuclear Experience (Operating Experience)

    International Nuclear Information System (INIS)

    2016-01-01

    Procurement of nuclear facilities in the United Kingdom is subject to nuclear site licence conditions issued by the Government through the Office for Nuclear Regulation (ONR). Each nuclear facility in the United Kingdom must have a nuclear site licence and must comply with the 36 general conditions that are set out in the Licence Condition Handbook (October 2014). In addition, the ONR has published a technical assessment guide for the procurement of nuclear safety related items or services; a guide on intelligent customers and a guide on records management also apply to the procurement phase, and ONR interventions look across all three of these documents. Procurement governance arrangements need to be developed (including a policy, manual, procedures and template documents) and approved within the utility company. The ONR monitors the arrangements via interventions and deems the arrangements to be ‘adequate’. Some procurement contracts become lifetime records for nuclear safety related systems and need to be retained while the plant is in place. A formal record retention schedule needs to be created and managed by the procurement organization. The utility company may elect to set hold points during the various procurement stages and, importantly, obtain approval for the contract and its content from all technical stakeholders (with particular emphasis on the engineering, project management and design authority quality functions before contract award). For contracts with high nuclear safety significance, the ONR may enforce additional hold points before and/or after contract award. There is a general requirement that the utility puts in place adequate arrangements to ensure that suitably qualified and experienced personnel are employed to implement adequate management arrangements and to act as an intelligent customer. This includes being able to demonstrate that any contractor or supplier is suitable, capable and experienced, and has the necessary processes and

  11. Ground Operations Demonstration Unit for Liquid Hydrogen Initial Test Results

    Science.gov (United States)

    Notardonato, W. U.; Johnson, W. L.; Swanger, A. M.; Tomsik, T.

    2015-01-01

    NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite major technology advances in the field of cryogenics. NASA loses approximately 50% of the hydrogen purchased because of a continuous heat leak into ground and flight vessels, transient chill down of warm cryogenic equipment, liquid bleeds, and vent losses. NASA Kennedy Space Center (KSC) needs to develop energy-efficient cryogenic ground systems to minimize propellant losses, simplify operations, and reduce cost associated with hydrogen usage. The GODU LH2 project has designed, assembled, and started testing of a prototype storage and distribution system for liquid hydrogen that represents an advanced end-to-end cryogenic propellant system for a ground launch complex. The project has multiple objectives including zero loss storage and transfer, liquefaction of gaseous hydrogen, and densification of liquid hydrogen. The system is unique because it uses an integrated refrigeration and storage system (IRAS) to control the state of the fluid. This paper will present and discuss the results of the initial phase of testing of the GODU LH2 system.

  12. Standard formatted data units-control authority operations

    Science.gov (United States)

    1991-01-01

    The purpose of this document is to illustrate a Control Authority's (CA) possible operation. The document is an interpretation and expansion of the concept found in the CA Procedures Recommendation. The CA is described in terms of the functions it performs for the management and control of data descriptions (metadata). Functions pertaining to the organization of Member Agency Control Authority Offices (MACAOs) (e.g., creating and disbanding) are not discussed. The document also provides an illustrative operational view of a CA through scenarios describing interaction between those roles involved in collecting, controlling, and accessing registered metadata. The roles interacting with the CA are identified by their actions in requesting and responding to requests for metadata, and by the type of information exchanged. The scenarios and examples presented in this document are illustrative only. They represent possible interactions supported by either a manual or automated system. These scenarios identify requirements for an automated system. These requirements are expressed by identifying the information to be exchanged and the services that may be provided by a CA for that exchange.

  13. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    International Nuclear Information System (INIS)

    Choi, C.H. . E-mail : chechee@khnp.co.kr

    2005-01-01

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  14. Hospital markup and operation outcomes in the United States.

    Science.gov (United States)

    Gani, Faiz; Ejaz, Aslam; Makary, Martin A; Pawlik, Timothy M

    2016-07-01

    Although the price hospitals charge for operations has broad financial implications, hospital pricing is not subject to regulation. We sought to characterize national variation in hospital price markup for major cardiothoracic and gastrointestinal operations and to evaluate perioperative outcomes of hospitals relative to hospital price markup. All hospitals in which a patient underwent a cardiothoracic or gastrointestinal procedure were identified using the Nationwide Inpatient Sample for 2012. Markup ratios (ratio of charges to costs) for the total cost of hospitalization were compared across hospitals. Risk-adjusted morbidity, failure-to-rescue, and mortality were calculated using multivariable, hierarchical logistic regression. Among the 3,498 hospitals identified, markup ratios ranged from 0.5-12.2, with a median markup ratio of 2.8 (interquartile range 2.7-3.9). For the 888 hospitals with extreme markup (greatest markup ratio quartile: markup ratio >3.9), the median markup ratio was 4.9 (interquartile range 4.3-6.0), with 10% of these hospitals billing more than 7 times the Medicare-allowable costs (markup ratio ≥7.25). Extreme markup hospitals were more often large (46.3% vs 33.8%, P markup ratio compared with 19.3% (n = 452) and 6.8% (n = 35) of nonprofit and government hospitals, respectively. Perioperative morbidity (32.7% vs 26.4%, P markup hospitals. There is wide variation in hospital markup for cardiothoracic and gastrointestinal procedures, with approximately a quarter of hospital charges being 4 times greater than the actual cost of hospitalization. Hospitals with an extreme markup had greater perioperative morbidity. Copyright © 2016 Elsevier Inc. All rights reserved.

  15. The chemical energy unit partial oxidation reactor operation simulation modeling

    Science.gov (United States)

    Mrakin, A. N.; Selivanov, A. A.; Batrakov, P. A.; Sotnikov, D. G.

    2018-01-01

    The chemical energy unit scheme for synthesis gas, electric and heat energy production which is possible to be used both for the chemical industry on-site facilities and under field conditions is represented in the paper. The partial oxidation reactor gasification process mathematical model is described and reaction products composition and temperature determining algorithm flow diagram is shown. The developed software product verification showed good convergence of the experimental values and calculations according to the other programmes: the temperature determining relative discrepancy amounted from 4 to 5 %, while the absolute composition discrepancy ranged from 1 to 3%. The synthesis gas composition was found out practically not to depend on the supplied into the partial oxidation reactor (POR) water vapour enthalpy and compressor air pressure increase ratio. Moreover, air consumption coefficient α increase from 0.7 to 0.9 was found out to decrease synthesis gas target components (carbon and hydrogen oxides) specific yield by nearly 2 times and synthesis gas target components required ratio was revealed to be seen in the water vapour specific consumption area (from 5 to 6 kg/kg of fuel).

  16. Nurse managers' decision-making in daily unit operation in peri-operative settings: a cross-sectional descriptive study.

    Science.gov (United States)

    Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina

    2016-09-01

    To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.

  17. Female Participation in Formed Police Units: A Report on the Integration of Women in Formed Police Units of Peacekeeping Operations

    Science.gov (United States)

    2012-09-01

    of Peacekeeping Operations in accor- dance with the principles of United Nations (UN) Res- olution 1325. To address this topic the study (1) briefly...that the eligibility criteria was revised to include women who played support roles to the combatants, as cooks, por- ters, sex slaves or spies

  18. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  19. Analysis of Fukushima unit 2 accident considering the operating conditions of RCIC system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il, E-mail: sikim@kaeri.re.kr; Park, Jong Hwa; Ha, Kwang Soon; Cho, Song-Won; Song, JinHo

    2016-03-15

    Highlights: • Fukushima unit 2 accident was analyzed using MELCOR 1.8.6. • RCIC operating conditions were assumed and best case was selected. • Effect of RCIC operating condition on accident scenario was found. - Abstract: A severe accident in Fukushima occurred on March 11, 2011 and units 1, 2 and 3 were damaged severely. A tsunami following an earthquake made the supply of electricity power stop, and the safety systems, which use AC or DC power in plants could not operate properly. It is supposed that the degree of core degradation of unit 2 is less serious than in the other plants, and it was estimated that the operation of reactor core isolation cooling (RCIC) system at the initial stage of the accident minimized the core damage through decay heat removal. Although the operating conditions of the RCIC system are not known clearly, it can be important to analyze the accident scenario of unit 2. In this study, best case of the Fukushima unit 2 accident was presented considering the operating conditions of the RCIC system. The effects of operating condition on core degradation and fission product release rate to environment were also examined. In addition, importance of torus room flooding level in the accident analysis was discussed. MELCOR 1.8.6 was used in this research, and the geometries of plant and operating conditions of safety system were obtained from TEPCO through OECD/NEA BSAF Project.

  20. Explicit isospectral flows for the AKNS operator on the unit interval

    International Nuclear Information System (INIS)

    Amour, L

    2009-01-01

    We consider the AKNS operator on the unit interval. The boundary conditions are self-adjoint separated boundary conditions. For fixed boundary conditions, we make the formulae for flows induced by general tangent vector fields on isospectral sets explicit

  1. Analysis of the Vertical Takeoff and Landing Unmanned Aerial Vehicle (VTUAV) in Small Unit Urban Operations

    National Research Council Canada - National Science Library

    Cason, Roman

    2004-01-01

    ...) to replace the aging Pioneer Unmanned Aerial Vehicle (UAV) system. This thesis examines the critical elements this platform must possess to effectively support small units operating in urban environments...

  2. Start-up and commercial operation of the Laguna Verde power plants, unit 1

    International Nuclear Information System (INIS)

    Torres R, J.F.

    1991-01-01

    The main features of the unit 1 of the Laguna Verde Power Plant is presented as well as the phases of the start-up process. The process includes various steps and tests up to start the commercial operation. (author)

  3. Description of work for 100-DR-2 Operable Unit Vadose Drilling/test pits

    International Nuclear Information System (INIS)

    Naiknimbalkar, N.

    1993-01-01

    This report describes the scope of work for the boreholes/test pits of the 100-DR-2 Operable Unit. Sampling and field activities include: Soil screening; geologic sampling; soil sampling (physical property); analytical sampling and depths; and geophysical logging

  4. Pilgrim Nuclear Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 2,415,511 MWH with the generator on line 5,333.6 hrs. Information is presented concerning operations, procedure changes, tests, experiments, maintenance, unit shutdowns and power reductions, and radiation doses to personnel

  5. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    International Nuclear Information System (INIS)

    1998-03-01

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  6. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  7. Record of Decision for the Ford Building Waste Unit (643-11G) Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Fraley, S.

    2002-01-01

    This decision document presents the selected remedial for the Ford Building Waste Unit (FBWU), in Aiken, South Carolina, which was chosen in accordance with CERCLA, as amended by SARA, and, to the extent practical, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This decision is based on the Administrative Record File for this specific RCRA/CERCLA site

  8. An operating nuclear utility's experience with the ALARA design of a new nuclear unit

    International Nuclear Information System (INIS)

    Rodgers, R.C.

    1985-01-01

    This talk presents a review of how operating experience at Northeast Utilities has been factored into the design of a new nuclear unit and the development and management of the radiation protection program. Their operational experience has indicated that there are two facets to keeping radiation exposures ALARA. The first is the proper ALARA design of the unit. The other facet is the design of a comprehensive radiation protection program. The author discusses these facets in some detail

  9. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  10. H. B. Robinson Plant, Unit 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit achieved a good performance record through the year, experiencing only short duration shutdowns or power reductions. Information is presented concerning operations, maintenance, shutdowns, and occupational radiation exposures. In November there was a scheduled refueling lasting 40 days. After a start-up physics test program, the unit achieved 100 percent power on December 22, 1976

  11. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  12. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. E. Shanklin

    2007-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  13. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    International Nuclear Information System (INIS)

    D. Shanklin

    2006-01-01

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

  14. 78 FR 14361 - U.S. Steel Tubular Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United...

    Science.gov (United States)

    2013-03-05

    ... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, PA; Notice of Initiation of Investigation To Terminate Certification of Eligibility Pursuant to... Tubular Products, McKeesport Tubular Operations Division, Subsidiary of United States Steel Corporation...

  15. Operating experience with unit for sulfuric acid alkylation of isobutane by butylenes

    Energy Technology Data Exchange (ETDEWEB)

    Tagavov, I.T.; Sumanov, V.T.; Khadzhiev, S.N.

    1988-09-01

    The operation of units for the sulfuric acid alkylation of isobutanes by butylenes have been performed. The reaction was carried out in a KSG-3 horizontal sulfuric acid contractor. A butane-butylene fraction from catalytic cracking and an isobutane fraction from the central gas fractionating unit were used as a feedstock. The studies have shown that the unit will give a high-quality product under various conditions of operation. The specific consumption of sulfuric acid in processing different types of feed remains within acceptable limits.

  16. Decommissioning strategy of the operating WWER type units in the Ukraine

    International Nuclear Information System (INIS)

    Litvinsky, L.L.; Lobach, Yu.N.; Skripov, A.E.

    2002-01-01

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  17. OPERATING OF MOBILE MACHINE UNITS SYSTEM USING THE MODEL OF MULTICOMPONENT COMPLEX MOVEMENT

    Directory of Open Access Journals (Sweden)

    A. Lebedev

    2015-07-01

    Full Text Available To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  18. Operating of mobile machine units system using the model of multicomponent complex movement

    OpenAIRE

    A. Lebedev; R. Kaidalov; N. Artiomov; M. Shulyak; M. Podrigalo; D. Abramov; D. Klets

    2015-01-01

    To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite) movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  19. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  20. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  1. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Directory of Open Access Journals (Sweden)

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  2. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  3. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  4. Use of Special Operations Forces in United Nations Missions: a Method to Resolve Complexity

    Science.gov (United States)

    2015-05-21

    physical stamina and psychological stability, followed by a rigorous training program are the imperatives to create SOF soldiers.42 Mark Bowden in...recommendation is that the United Nations should establish a Special Operations planning cell within the UN Department of Peacekeeping Operations. As of...now, the cell is nonexistent. This cell should be able to facilitate the integration of SOF into the overall peace operations concept. Finally, the

  5. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  6. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    International Nuclear Information System (INIS)

    Specht, W.L.

    2000-01-01

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity

  7. An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management

    Science.gov (United States)

    2010-12-01

    An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY

  8. 100 Area source operable unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    In accordance with the Hanford Past-Practice Strategy (HPPS), a focused feasibility study (FFS) is performed for those waste sites which have been identified as candidates for interim remedial measures (IRM) based on information contained in applicable work plans and limited field investigations (LFI). The FFS process for the 100 Area source operable units will be conducted in two stages. This report, hereafter referred to as the Process Document, documents the first stage of the process. In this stage, IRM alternatives are developed and analyzed on the basis of waste site groups associated with the 100 Area source operable units. The second stage, site-specific evaluation of the IRM alternatives presented in this Process Document, is documented in a series of operable unit-specific reports. The objective of the FFS (this Process Document and subsequent operable unit-specific reports) is to provide decision makers with sufficient information to allow appropriate and timely selection of IRM for sites associated with the 100 Area source operable units. Accordingly, the following information is presented: a presentation of remedial action objectives; a description of 100 Area waste site groups and associated group profiles; a description of IRM alternatives; and detailed and comparative analyses of the IRM alternatives

  9. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  10. Multipurpose units: combining of technological operations of a soil cultivating and seeding

    Directory of Open Access Journals (Sweden)

    D. A. Petukhov

    2015-01-01

    Full Text Available The modern domestic market of technique for grain crops seeding differs variety of machines brands and types. The intensive type technologies combining technological operations of a soil cultivating and grain crops seeding in one pass are more widely used. The authors have established that one-operational units in new machine park have to be replaced multipurpose, universal and combined machines. Such approach will reduce number of machines in grain production from 20-30 to 5-6 name titles. Possibilities of multipurpose sowing units for simultaneous fertilizers application, soil cultivating and weeds destruction were analyzed. It was specified that nowadays there are several technologies types with two, four or six operations overlapping. Operational performance, technological and economical efficiency of the best multipurpose and also efficiency of technological operations overlapping at grain crops cultivating in the conditions of their real operation and at a trial establishment in the Kuban research institute of information and technical and economic studies of agro-industrial complex engineering and technical services were studied. Tit was defined that use of multipurpose sowing units and also studied efficiency of decreases operational costs by 48-71 percent, fuel consumption - by 41-76 percent and reduces labor input by 72-80 percent. Thus grain crops seeding is possible in optimal agrotime because of 4-6 technological operations overlapping in one pass.

  11. Compex system for teaching and training operators for TPP and NPP power units

    International Nuclear Information System (INIS)

    Tsiptsyura, R.D.

    1985-01-01

    Requirements, taken as a principle for constructing the system for operator teaching and training (OTT), have been formulated on the basis of investigation of operators' work at TPP and NPP power units. Functional structure and a structural block-diagram for OTT are built. As a criterion, which determines the structure of any trainers, being a part of OTT a requirement has been chosen satisfying the correspondence beetween habits developed with the help of trainers and habits of real operators' work. Results of analysis permit to confirm that refusal or under statement of the role of any stage of operator training leads to reduction of quality of his training

  12. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  13. Study of the thermal behavior of a latent heat cold storage unit operating under frosting conditions

    International Nuclear Information System (INIS)

    Simard, A.P.; Lacroix, M.

    2003-01-01

    A study is performed of the thermal behavior of a latent heat cold storage unit operating under frosting conditions. This unit is employed to maintain the temperature inside the refrigerated compartment of a truck below 265 K. The system consists of parallel plates filled with a phase change material (PCM) that absorbs heat from the flow of warm moist air. A mathematical model for the system is first presented and, next, validated with numerical and experimental data. It is then exploited to assess the effects of design parameters and operating conditions on the performance of the system. The recommended thickness and distance separating the PCM plates are found to be 50x10 -3 and 30x10 -3 m, respectively. The results indicate that the performance of the unit is enhanced by turbulent air flow in spite of the increased pressure loss and accentuated frost growth. The unit also performs well even when the surrounding relative humidity is 100%

  14. Barriers to high conversion operations in an ebullated bed unit -- Relationship between sedimentation and operability

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, D. [Criterion Catalysts Company L.P., Houston, TX (United States)

    2000-07-01

    Ebullated-Bed (EB) catalytic processes are high temperature, high pressure residue hydrocrackers, which transform sour feeds into light, sweet products. EB processes typically involve one or more trains, with one, two, or three EB reactors in series. The key to operating any EB process is to control the 'sediment' which tends to increase with increasing level of conversion. Sediment problems are generally attributed to the catalyst. While this is true in some cases, there are certain problems that occur regardless of the catalyst used, whereas in some situations sediments from the EB process can actually be controlled by the catalyst. This paper describes two typical sedimentation patterns; one in which the sediment increases, and another in which sediment decreases as the EB products move through the recovery section. The benefits of sediment control are illustrated for the latter sedimentation pattern.

  15. Estimation of the optimal operating conditions for a radiation chemical neutralization unit

    International Nuclear Information System (INIS)

    Putilov, A.V.; Kamenetskaya, S.A.; Pshezhetskii, S.Ya.; Kazakov, M.S.; Kudryavtsev, S.L.; Petrukhin, N.V.; Misharin, B.A.; Koneev, V.Z.

    1985-01-01

    An estimate is made of the effect of the hydrodynamic conditions on the efficiency of foam units for the radiation chemical neutralization of impurities, taking into account the penetrating power of accelerated electrons having various energies. Expressions are obtained for calculating the efficiency of such units with sectionized operation of the chamber and taking account of the effect of incomplete mixing of the products of radiolysis through the height of the foam layer

  16. Design and operational parameters of transportable supercritical water oxidation waste destruction unit

    International Nuclear Information System (INIS)

    McFarland, R.D.; Brewer, G.R.; Rofer, C.K.

    1991-12-01

    Supercritical water oxidation (SCWO) is the destruction of hazardous waste by oxidation in the presence of water at temperatures and pressures above its critical point. A 1 gal/h SCWO waste destruction unit (WDU) has been designed, built, and operated at Los Alamos National Laboratory. This unit is transportable and is intended to demonstrate the SCWO technology on wastes at Department of Energy sites. This report describes the design of the WDU and the preliminary testing phase leading to demonstration

  17. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    International Nuclear Information System (INIS)

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  18. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 7, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Unit 3 generated 1,968,074 MWh(e) net electric power and the generator was on line 2,802.9 hrs. Unit 4 generated 2,560,476 MWh(e) and was on line 3,944.8 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, radiological environmental monitoring, and occupational personnel radiation monitoring

  19. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    International Nuclear Information System (INIS)

    Palmer, E.R.

    1994-10-01

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  20. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    International Nuclear Information System (INIS)

    Yin, S.C.L.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios

  1. Prospects and requirements for an operational modelling unit in flood crisis situations

    Directory of Open Access Journals (Sweden)

    Anders Katharina

    2016-01-01

    Full Text Available Dike failure events pose severe flood crisis situations on areas in the hinterland of dikes. In recent decades the importance of being prepared for dike breaches has been increasingly recognized. However, the pre-assessment of inundation resulting from dike breaches is possible only based on scenarios, which might not reflect the situation of a real event. This paper presents a setup and workflow that allows to model dike breachinduced inundation operationally, i.e. when an event is imminent or occurring. A comprehensive system setup of an operational modelling unit has been developed and implemented in the frame of a federal project in Saxony-Anhalt, Germany. The modelling unit setup comprises a powerful methodology of flood modelling and elaborated operational guidelines for crisis situations. Nevertheless, it is of fundamental importance that the modelling unit is instated prior to flood events as a permanent system. Moreover the unit needs to be fully integrated in flood crisis management. If these crucial requirements are met, a modelling unit is capable of fundamentally supporting flood management with operational prognoses of adequate quality even in the limited timeframe of crisis situations.

  2. Biblis 1,300 MW unit B in operation for thirty years

    International Nuclear Information System (INIS)

    Lauer, H.

    2006-01-01

    Over the past thirty years, unit B of the Biblis nuclear power station has contributed towards safe, reliable and non-polluting electricity generation. Unit B was the first 1,300 MW unit in the world confirming the good experience accumulated in the construction and operation of plants this size. It laid the foundation for the advanced development of nuclear power plants up to the convoy line. The good availability this plant has achieved in its operating cycles proves the mature state of technology and the high level of qualification and motivation of the power plant staff and the personnel of external firms contracted to work for Biblis. Biblis B has served as a reference plant in German nuclear safety research, demonstrating that units this size can be operated safely. Unit B is also living proof of the possibility to raise nuclear power plants built in the seventies to the current state of the art by implementing the appropriate backfitting and modernization measures. Today, Biblis B is operated at a safety level clearly higher than that to be achieved for new plants internationally. This is also evident from comparison with the guiding values for the safety of new facilities as published by the International Atomic Energy Agency (IAEA). (orig.)

  3. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  4. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  5. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  6. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    International Nuclear Information System (INIS)

    Biggerstaff, R.L.

    1994-01-01

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy's (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment

  7. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  8. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    International Nuclear Information System (INIS)

    Brehm, D.M.

    1998-06-01

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  9. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  10. Phase 1 remedial investigation report for 200-BP-1 operable unit

    International Nuclear Information System (INIS)

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  11. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    International Nuclear Information System (INIS)

    Lee, Kai-Yan; Fung, Chi-Hang Fred; Chau, H F

    2013-01-01

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state. (paper)

  12. Peach Bottom Atomic Power Station, Units 2 and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Unit 2 experienced 11 forced outages, 5 power reductions, and one major refueling outage which lasted about 3 months during which time the feedwater spargers were replaced. Net electrical power generated was 5,569,633 MWH with the generator on line 5,998 hrs. Unit 3 experienced 17 forced outages, 11 power reductions and 2 major outages. The first refueling outage began 12/24/77. Net electrical power generated was 6,049,644 MWH with the unit on line 6,829 hrs. Information is presented concerning operations, personnel exposures, radioactive releases, maintenance, and irradiated fuel examination

  13. NUMATH: a nuclear-material-holdup estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.

    1981-01-01

    A computer program, NUMATH (Nuclear Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. NUMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels-including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, NUMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balance for thorium during steady-state process operation

  14. Categorization of safety related motor operated valve safety significance for Ulchin Unit 3

    International Nuclear Information System (INIS)

    Kang, D. I.; Kim, K. Y.

    2002-03-01

    We performed a categorization of safety related Motor Operated Valve (MOV) safety significance for Ulchin Unit 3. The safety evaluation of MOV of domestic nuclear power plants affects the generic data used for the quantification of MOV common cause failure ( CCF) events in Ulchin Units 3 PSA. Therefore, in this study, we re-estimated the MGL(Multiple Greek Letter) parameter used for the evaluation of MOV CCF probabilities in Ulchin Units 3 Probabilistic Safety Assessment (PSA) and performed a classification of the MOV safety significance. The re-estimation results of the MGL parameter show that its value is decreased by 30% compared with the current value in Ulchin Unit 3 PSA. The categorization results of MOV safety significance using the changed value of MGL parameter shows that the number of HSSCs(High Safety Significant Components) is decreased by 54.5% compared with those using the current value of it in Ulchin Units 3 PSA

  15. Denver Radium Site -- Operable Unit I closeout report for the US Environmental Protection Agency

    International Nuclear Information System (INIS)

    1992-08-01

    The Denver Radium Site consists of properties in the Denver, Colorado, area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 gaps or operable units to facilitate remedial action of the Site. Operable Unit I is an 8-acre block bounded by Quivas Street to the east, Shoshone Street to the west, West 12th Avenue to the south, and West 13th Avenue to the north. The primary focus of interest concerning investigations of radiological contamination was a radium, vanadium, and uranium processing facility at 1201 Quivas Street owned by the Pittsburgh Radium Company (PRC) from 1925 until 1926. The Radium Ores Company, which was associated with PRC, operated the facility until 1927. A Remedial investigation (RI) of Operable Unit I was prepared by Jacobs Engineering Group and CH 2 M Hill on behalf of EPA in April 1986. The draft Feasibility Study (FS), prepared by Jacobs Engineering Group and CH 2 M Hill, was issued in July 1987 (the final FS is the Community Relations Responsiveness Summary with an errata to the draft, issued September 1987). The RI focused on radium uranium processing residues discarded in the early 1900s. These residues contained uranium, radium, and thorium. EPA s Community Relations Plan involved the community in the decision-making process relating to the remedy to be implemented at Operable Unit X, and promoted communications among interested parties throughout the course of the project. The remedial action alternative preferred by EPA for Operable Unit I was Off-Site Permanent Disposal. Because a permanent disposal facility was not available at the time the Record of Decision was issued in September 1987, EPA selected the On-Site Temporary Containment (capping) with the Off-Site Permanent Disposal alternative

  16. 40 CFR 60.2989 - Does this subpart directly affect incineration unit owners and operators in my State?

    Science.gov (United States)

    2010-07-01

    ... incineration unit owners and operators in my State? 60.2989 Section 60.2989 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... incineration unit owners and operators in my State? (a) No, this subpart does not directly affect incineration...

  17. 40 CFR 62.15145 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...

  18. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  19. Hydrologic resources management program and underground test area operable unit fy 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  20. Use of the LITEE Lorn Manufacturing Case Study in a Senior Chemical Engineering Unit Operations Laboratory

    Science.gov (United States)

    Abraham, Nithin Susan; Abulencia, James Patrick

    2011-01-01

    This study focuses on the effectiveness of incorporating the Laboratory for Innovative Technology and Engineering Education (LITEE) Lorn Manufacturing case into a senior level chemical engineering unit operations course at Manhattan College. The purpose of using the case study is to demonstrate the relevance of ethics to chemical engineering…

  1. Ambiguity in Units and the Referents: Two Cases in Rational Number Operations

    Science.gov (United States)

    Rathouz, Margaret

    2010-01-01

    I explore the impact of ambiguous referral to the unit on understanding of decimal and fraction operations during episodes in two different mathematics courses for pre-service teachers (PSTs). In one classroom, the instructor introduces a rectangular area diagram to help the PSTs visualize decimal multiplication. A transcript from this classroom…

  2. Qualitative risk assessment for the 100-NR-2 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This qualitative risk assessment provides information about the 100- NR-2 Groundwater Operable Unit of the Hanford reservation. Topics discussed in this report are: data evaluation; human health risk assessment overview; ecological evaluations; summary of uncertainty; results of both the ecological and human health evaluations; toxicity assessment; risk characterization; and a summary of contaminants of potential concern

  3. Limited field investigation report for the 100-KR-4 Operable Unit

    International Nuclear Information System (INIS)

    1994-07-01

    This limited field investigation (LFI) was conducted to optimize the use of interim remedial measures (IRM) for expediting clean up while maintaining a technically sound and cost-effective program. The 100-KR-4 Operable Unit is one of four operable units associated with the 100 K Area. Operable units KR-1, KR-2 and KR-3 address contaminant sources while 100-KR-4 addresses contamination present in the underlying groundwater. The IRM decision process for groundwater operable units is based on three aspects: (1) Is the concentration greater than Hanford background? (2) Does the concentration present a medium or high human-health risk? (3) Does the concentration exceed an ecologically based applicable, relevant and appropriate requirements (ARAR) or present an environmental hazard quotient > I? The primary methods of investigation used during this LFI were the installation of monitoring wells and sampling of groundwater. The samples collected from the groundwater and soils were submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the location and degree of contamination. All soil samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all first round and a minimum of 10% of subsequent round data were validated

  4. Donald C. Cook Nuclear Power Plant, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The unit was paralleled to the grid 83.1 percent of the time and 7,073,200 MWH gross was generated. There were six scheduled outages and 14 forced outages/load reductions. Information is presented concerning operations, shutdowns, power reductions, inservice maintenance, personnel radiation exposures, fuel history, and facility changes

  5. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  6. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    Science.gov (United States)

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  7. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  8. Limited field investigation report for the 100-DR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km 2 (0.59 mi 2 ) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  9. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  10. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  11. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  12. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River

  13. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Energy Technology Data Exchange (ETDEWEB)

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  14. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    International Nuclear Information System (INIS)

    Mellor, S.P.; Matthee, F.W.

    2002-01-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  15. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    International Nuclear Information System (INIS)

    Halada, P.; Cillik, I.; Stojka, T.; Kuzma, M.; Prochaska, J.; Vrtik, L.

    2004-01-01

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  16. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  17. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  18. Limited field investigation report for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-09-01

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses

  19. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment (QRA). The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, bum pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy [DOE], the US Environmental Protection Agency [EPA], and Washington Department of Ecology [Ecology]) during the preparation of the 100-HR-2 Operable Unit work plan (DOE/RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure (IRM) as per the Hanford Past-Practice Strategy (HPPS) (DOE/RL 1991) and negotiations with DOE, EPA, and Ecology. An IRM is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The investigative phase was conducted in accordance with the RCRA Facility Investigation/Corrective Measures Study Work Plan for the 100-HR-2 Operable Unit (DOE/RL 1993f). The QRA was performed in accordance with the Hanford Site Baseline Risk Assessment Methodology (DOE/RL 1993b) and the recommendations incorporate the strategies of the HPPS. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and (4) provide a human health and ecological QRA associated with solid waste burial grounds

  20. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  1. Soil washing physical separations test procedure - 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Belden, R.D.

    1993-01-01

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  2. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  3. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  4. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  5. Emergency operating instruction improvements at San Onofre Nuclear Generating Station Units 2 and 3

    International Nuclear Information System (INIS)

    Trillo, M.W.; Smith, B.H.

    1989-01-01

    In late 1987, San Onofre nuclear generating station (SONGS) began an extensive upgrade of the units 2 and 3 emergency operating instructions (EOIs). The original intent of this program was to incorporate revised generic guidance and to correct problems that were identified by operators. While this program was in progress, the US Nuclear Regulatory Commission (NRC) conducted a series of audits of emergency operating procedure (EOP) development and maintenance programs as 16 commercial nuclear facilities in the United States. These audits included four stations with Combustion Engineering-designed nuclear steam supply systems. (One of these audits included a review of preupgrade SONGS units 2 and 3 EOIs.) Significant industrywide comments resulted from these audits. The NRC has stated its intent to continue the review and audit of EOIs and the associated maintenance programs at all US commercial nuclear facilities. The units 2 and 3 EOI upgrade program developed procedural improvements and procedural program maintenance improvements that address many of the existing audit comments that have been received by the industry. Other resulting improvements may be useful in minimizing NRC comments in future such audits. Specific improvements are discussed. The upgrade program resulted in benefits that were not originally anticipated. The results of this program can be of significant use by other utilities in addressing the industrywide concerns that have been raised in recent NRC audits of EOP development and maintenance programs

  6. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  7. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  8. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  9. Retrofitting and operation solid radwaste system Dresden Station, Units 2 and 3

    International Nuclear Information System (INIS)

    Testa, J.; Homer, J.C.

    1982-01-01

    Units 2 and 3 at Dresden Station are twin 794 MW (net) BWR units that became operational in 1970 and 1971. The waste streams are typical of BWR stations, namely, bead resin and filter sludge (powdered resins and diatomaceous earth), evaporator concentrate containing approximately 25% dissolved solids and dry active waste. The original solid radwaste system utilized cement for solidification in open top 55 gallon drums. Remote handling was provided by means of a monorail with moving platforms supporting the drums. A relatively light-weight compactor was used to compact DAW into 55 gallon drums. Difficulties were experienced with this system

  10. Qualitative risk assessment for the 100-FR-1 source operable unit

    International Nuclear Information System (INIS)

    Corporation, I.T.

    1994-08-01

    This report provides the Qualitative risk assessment (QRA) for the waste sites associated with the 100-FR-1 Operable Unit. The QRA is an evaluation of risk for a predefined set of human and ecological exposure scenarios. It is not intended to replace or be a substitute for a baseline risk assessment. The QRA is streamlined to consider only two human health scenarios (frequent-and occasional-use) with four exposure pathways (soil ingestion, fugitive dust inhalation, inhalation of volatile organics, and external radiation exposure) and a limited ecological evaluation. The use of these scenarios and pathways was agreed to by the 100 Area Tri-Party unit managers

  11. Indian Point Station, Unit 1 and 2. Semiannual operating report No. 24, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 1 was 519,130 MWH with the reactor critical for 2,400.39 hours and the generator on line for 2,316.14 hours. Unit 2 generated 2,427,828 MWH electrical power, was critical for 3,590.31 hours and the generator was on line for 3,485.41 hours. Operations and maintenance are summarized. Information is presented concerning radioactive effluent releases, occupational personnel radiation protection, primary coolant chemistry, changes, tests, and experiments. Environmental radioactivity is discussed. (U.S.)

  12. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  13. Automated processing of whole blood units: operational value and in vitro quality of final blood components.

    Science.gov (United States)

    Jurado, Marisa; Algora, Manuel; Garcia-Sanchez, Félix; Vico, Santiago; Rodriguez, Eva; Perez, Sonia; Barbolla, Luz

    2012-01-01

    The Community Transfusion Centre in Madrid currently processes whole blood using a conventional procedure (Compomat, Fresenius) followed by automated processing of buffy coats with the OrbiSac system (CaridianBCT). The Atreus 3C system (CaridianBCT) automates the production of red blood cells, plasma and an interim platelet unit from a whole blood unit. Interim platelet unit are pooled to produce a transfusable platelet unit. In this study the Atreus 3C system was evaluated and compared to the routine method with regards to product quality and operational value. Over a 5-week period 810 whole blood units were processed using the Atreus 3C system. The attributes of the automated process were compared to those of the routine method by assessing productivity, space, equipment and staffing requirements. The data obtained were evaluated in order to estimate the impact of implementing the Atreus 3C system in the routine setting of the blood centre. Yield and in vitro quality of the final blood components processed with the two systems were evaluated and compared. The Atreus 3C system enabled higher throughput while requiring less space and employee time by decreasing the amount of equipment and processing time per unit of whole blood processed. Whole blood units processed on the Atreus 3C system gave a higher platelet yield, a similar amount of red blood cells and a smaller volume of plasma. These results support the conclusion that the Atreus 3C system produces blood components meeting quality requirements while providing a high operational efficiency. Implementation of the Atreus 3C system could result in a large organisational improvement.

  14. An analysis of post-traumatic stress symptoms in United States Air Force drone operators.

    Science.gov (United States)

    Chappelle, Wayne; Goodman, Tanya; Reardon, Laura; Thompson, William

    2014-06-01

    Remotely piloted aircraft (RPA), commonly referred to as "drones," have emerged over the past decade as an innovative warfighting tool. Given there is a paucity of empirical research assessing drone operators, the purpose of this study was to assess for the prevalence of PTSD symptoms among this cohort. Of the 1084 United States Air Force (USAF) drone operators that participated, a total of 4.3% endorsed a pattern of symptoms of moderate to extreme level of severity meeting criteria outlined in the Diagnostic and Statistical Manual of Mental Disorders-4th edition. The incidence of PTSD among USAF drone operators in this study was lower than rates of PTSD (10-18%) among military personnel returning from deployment but higher than incidence rates (less than 1%) of USAF drone operators reported in electronic medical records. Although low PTSD rates may be promising, limitations to this study are discussed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  16. Dose rate evaluation of workers on the operation floor in Fukushima-Daiichi Unit 3

    Science.gov (United States)

    Matsushita, Kaoru; Kurosawa, Masahiko; Shirai, Keisuke; Matsuoka, Ippei; Mukaida, Naoki

    2017-09-01

    At Fukushima Daiichi Nuclear Power Plant Unit 3, installation of a fuel handling machine is planned to support the removal of spent fuel. The dose rates at the workplace were calculated based on the source distribution measured using a collimator in order to confirm that the dose rates on the operation floor were within a manageable range. It was confirmed that the accuracy of the source distribution was C/M = 1.0-2.4. These dose rates were then used to plan the work on the operation floor.

  17. Ageing Management of the reactor internals in Belgian nuclear units in view of Long Term Operation

    International Nuclear Information System (INIS)

    Gerard, R.; Bertolis, D.; Vissers, S.

    2012-01-01

    The reactor internals support the reactor core, distribute the coolant flow through the core, and guide and protect the rod control cluster assemblies and in-core instrumentation. Their integrity must be guaranteed in all operating and accident conditions. They are exposed to specific degradation mechanisms linked to the intense neutron irradiation, like Irradiation Assisted Stress Corrosion Cracking (IASCC) or potentially void swelling, in addition to more classical mechanisms like fatigue, wear and stress corrosion cracking. A rigorous follow-up of in-service degradation and an effective ageing management is therefore of crucial importance and contributes to the safe and economical operation of nuclear PWR units. (author)

  18. Development of in-situ product removal strategies in biocatalysis applying scaled-down unit operations

    DEFF Research Database (Denmark)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf Hoffmeyer

    2017-01-01

    different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit...... operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi...

  19. Coordinating bifurcated remediation of soil and groundwater at sites containing multiple operable units

    International Nuclear Information System (INIS)

    Laney, D.F.

    1996-01-01

    On larger and/or more complex sites, remediation of soil and groundwater is sometimes bifurcated. This presents some unique advantages with respect to expedited cleanup of one medium, however, it requires skillful planning and significant forethought to ensure that initial remediation efforts do not preclude some long-term options, and/or unduly influence the subsequent selection of a technology for the other operable units and/or media. this paper examines how the decision to bifurcate should be approached, the various methods of bifurcation, the advantages and disadvantages of bifurcation, and the best methods to build flexibility into the design of initial remediation systems so as to allow for consideration of a fuller range of options for remediation of other operable units and/or media at a later time. Pollutants of concern include: metals; petroleum hydrocarbons; and chlorinated solvents

  20. Steam generator tube integrity requirements and operating experience in the United States

    International Nuclear Information System (INIS)

    Karwoski, K.J.

    2009-01-01

    Steam generator tube integrity is important to the safe operation of pressurized-water reactors. For ensuring tube integrity, the U.S. Nuclear Regulatory Commission uses a regulatory framework that is largely performance based. This performance-based framework is supplemented with some prescriptive requirements. The framework recognizes that there are three combinations of tube materials and heat treatments currently used in the United States and that the operating experience depends, in part, on the type of material used. This paper summarizes the regulatory framework for ensuring steam generator tube integrity, it highlights the current status of steam generators, and it highlights some of the steam generator issues and challenges that exist in the United States. (author)

  1. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  2. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hong Key; Nho, Seung Hwan; Song, Myung Ho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-05-15

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  3. Computer Drawing Method for Operating Characteristic Curve of PV Power Plant Array Unit

    Science.gov (United States)

    Tan, Jianbin

    2018-02-01

    According to the engineering design of large-scale grid-connected photovoltaic power stations and the research and development of many simulation and analysis systems, it is necessary to draw a good computer graphics of the operating characteristic curves of photovoltaic array elements and to propose a good segmentation non-linear interpolation algorithm. In the calculation method, Component performance parameters as the main design basis, the computer can get 5 PV module performances. At the same time, combined with the PV array series and parallel connection, the computer drawing of the performance curve of the PV array unit can be realized. At the same time, the specific data onto the module of PV development software can be calculated, and the good operation of PV array unit can be improved on practical application.

  4. Main problems experienced on diesel generators of French 900 MWe operating units

    Energy Technology Data Exchange (ETDEWEB)

    Dredemis, Geoffroy; Jude, Francois [Commissariat a l' Energie Atomique, centre d' Etudes Nucleaires de Fontenay-aux-Roses, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    Each unit of all the French nuclear power plant is equipped with two diesel emergency generator sets., For the totality of standards PWRs of 900 MWe, they are identical. We present in this communication the most significative failures met with diesel engines on operating units, such as rupture of fuel injection pipes, breaking of the connecting rods, and cylinder lubrication failures. All these incidents, which affected the emergency power sources of concerned units, had generic characteristics. In view of their potential consequences, it was proceeded in each case to an immediate control of the components concerned of all PWR 900 MWe diesel engines. At the same time, studies were started as to what modifications would permit to solve rapidly each one of the problems met with. (authors)

  5. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    International Nuclear Information System (INIS)

    Torres Ramirez, J.F.

    1991-01-01

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  6. 200-ZP-1 operable unit borehole summary report for FY 1995 and FY 1996

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-10-01

    This document details the well construction, sampling, analyses, and geologic character of the Ringold Formation fluvial unit E gravels as encountered in 16 boreholes in the 200-ZP-1 Operable Unit. These boreholes were drilled by Water Development Hanford Corporation during fiscal years 1995 and 1996. Two of the sixteen boreholes were abandoned; the remaining 14 boreholes were completed as functioning production and compliance wells. The borehole logs and well summary sheets included as Appendices A and B of this document, respectively, depict and describe the vadose zone stratigraphic units encountered during the course of drilling. Appendix C contains the results of sieve analyses conducted on samples obtained via resonant sonic coring and standard split-spoon methods. The sieve analyses were the driver behind the majority of the well designs. Also, for completeness, Appendices D and E contain the well design calculations and the well development process

  7. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    International Nuclear Information System (INIS)

    Cushing, C.E.

    1993-04-01

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60 Co, 90 Sr, and 137 Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  8. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  9. INEL Operable Unit 7-13 containment and stabilization configuration option

    International Nuclear Information System (INIS)

    Raivo, B.D.; Richardson, J.G.; Nickelson, D.F.

    1993-05-01

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory's Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option

  10. Baseline groundwater model update for p-area groundwater operable unit, NBN

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States); Amidon, M. [Savannah River Site (SRS), Aiken, SC (United States)

    2015-09-01

    This report documents the development of a numerical groundwater flow and transport model of the hydrogeologic system of the P-Area Reactor Groundwater Operable Unit at the Savannah River Site (SRS) (Figure 1-1). The P-Area model provides a tool to aid in understanding the hydrologic and geochemical processes that control the development and migration of the current tritium, tetrachloroethene (PCE), and trichloroethene (TCE) plumes in this region.

  11. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  12. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    International Nuclear Information System (INIS)

    Delacroix, C.

    1990-01-01

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized [fr

  13. Limited field investigation report for the 100-HR-2 Operable Unit

    International Nuclear Information System (INIS)

    1995-07-01

    This report summarizes the data collection and analysis activities conducted during the 100-HR-2 Operable Unit investigative phase and the associated qualitative risk assessment. The 100-HR-2 Operable Unit contains solid waste burial grounds, an ash pit, burn pits, electrical facilities, septic systems, and support facilities. All known and suspected areas of contamination were classified as solid waste burial grounds or low-priority waste sites based on the collective knowledge of the operable unit managers (representatives from the US Department of Energy, the US Environmental Protection Agency, and Washington State Department of Ecology during the preparation of the 100-HR-2 Operable Unit Work Plan (DOE-RL 1993f). Solid waste burial grounds were judged to pose sufficient risk(s), through one or more pathways, to require evaluation for an interim remedial measure as per the Hanford Past-Practice Strategy (DOE-RL 1991) and negotiations with the Department of Energy, US Environmental Protection Agency, and Washington State Department of Ecology. An interim remedial measure is intended to achieve remedies that are likely to lead to a final record of decision. Low-priority sites are those judged not to pose significant risk to require the streamlined evaluation. There were six low-priority waste sites and seven solid waste burial grounds identified. The purpose of this report is to: (1) provide a summary of site investigative activities; (2) refine the conceptual exposure model (as needed); (3) identify chemical- and location-specific corrective action requirements; and 4) provide a human health and ecological QRA associated with solid waste burial grounds

  14. Site-specific waste management instruction for the 100-KR-4 Operable Unit drilling

    International Nuclear Information System (INIS)

    Hadley, J.T.

    1996-07-01

    This site-specific waste management instruction provides guidance for the management of waste generated as a result of groundwater well installations in the 100-KR-4 Operable Unit (OU). The well installations are necessary to implement the Remedial Action (RA) option (pump-and-treat using ion exchange) to prevent discharge of hexavalent chromium at levels above those considered protective of aquatic life in the Columbia River and riverbed sediments

  15. Site-specific waste management instruction for the 100-KR-4 Operable Unit drilling. Revision 1

    International Nuclear Information System (INIS)

    Hadley, J.T.

    1996-08-01

    This site-specific waste management instruction provides guidance for the management of waste generated as a result of groundwater well installations in the 100-KR-4 Operable Unit (OU). The well installations are necessary to implement the Remedial Action (RA) option (pump-and-treat using ion exchange) to prevent discharge of hexavalent chromium at levels above those considered protective of aquatic life in the Columbia River and riverbed sediments

  16. Data validation report for the 100-HR-3 Operable Unit, fifth round groundwater samples

    International Nuclear Information System (INIS)

    Vukelich, S.E.

    1994-01-01

    The data from the chemical analysis of 68 samples from the 100-HR-3 Operable Unit Third Quarter 1993 Groundwater Sampling Investigation and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at the site. Sample analysis included inorganics and general chemical parameters. Fifty three samples were validated for radiochemical parameters

  17. Data validation report for the 100-KR-4 operable unit first quarter, 1994

    International Nuclear Information System (INIS)

    Krug, A.D.

    1994-01-01

    Samples were obtained from the 100-KR-4 Operable Unit first Quarter 1994 Groundwater Sampling event. The data from the chemical analysis of fifty-eight samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported samples results were of sufficient quality to support decisions regarding remedial actions performed at this site. Information fro the sampling event and the information validation processes are presented in this document

  18. Data validation report for the 100-D Ponds Operable Unit: 100-D ponds sampling

    International Nuclear Information System (INIS)

    Stankovich, M.T.

    1994-01-01

    Westinghouse-Hanford has requested that 100 percent of the Sample Delivery Groups be validated for the 100-D Ponds Operable Unit Sampling Investigation. Therefore the data from the chemical analysis of all 30 samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site

  19. Data validation summary report for the 100-BC-5 Operable Unit Round 8 Groundwater Sampling

    International Nuclear Information System (INIS)

    Kearney, A.T.

    1996-03-01

    The information provided in this validation summary report includes data from the chemical analyses of samples from the 100-BC-5 Operable Unit Round 8 Groundwater Sampling Investigation. All of the data from this sampling event and their related quality assurance samples were reviewed and validated to verify that the reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. Sample analyses included metals, general chemistry and radiochemistry

  20. Contaminant Attenuation and Transport Characterization of 200-DV-1 Operable Unit Sediment Samples

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moran, James J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M.V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lawter, Amanda R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Resch, Charles T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gartman, Brandy N. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhong, Lirong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nims, Megan K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Saunders, Danielle L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, Benjamin D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Horner, Jacob A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leavy, Ian I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baum, Steven R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Christiansen, Beren B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Clayton, Ray E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McElroy, Erin M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Appriou, Delphine [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tyrrell, Kimberly J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Striluk, Miranda L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-15

    A laboratory study was conducted to quantify contaminant attenuation processes and associated contaminant transport parameters that are needed to evaluate transport of contaminants through the vadose zone to the groundwater. The laboratory study information, in conjunction with transport analyses, can be used as input to evaluate the feasibility of Monitored Natural Attenuation and other remedies for the 200-DV-1 Operable Unit at the Hanford Site.

  1. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    Science.gov (United States)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  2. Final record of decision for remedial actions at Operable Unit 4

    International Nuclear Information System (INIS)

    1994-12-01

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. This remedial action was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable 40 Code of Federal Regulations (CFR) Part 300, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). For Operable Unit 4 at the FEMP, DOE has chosen to complete an integrated CERCLA/NEPA process. This decision was based on the longstanding interest on the part of local stakeholders to prepare an Environmental Impact Statement (EIS) on the restoration activities at the FEMP and on the recognition that the draft document was issued and public comments received. Therefore, this single document is intended to serve as DOE's Record of Decision (ROD) for Operable Unit 4 under both CERCLA and NEPA; however, it is not the intent of the DOE to make a statement on the legal applicability of NEPA to CERCLA actions

  3. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    Science.gov (United States)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  4. 100-HR-1 Operable Unit focused feasibility study report. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    The standard Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Feasibility Study (FS) includes development and screening of alternatives (phases 1 and 2) and the detailed analysis of alternatives (phase 3). This focused feasibility study (FFS) constitutes the phase 3 portion of the FS process. The FFS process is conducted in two stages, a Process Document (DOE-RL 1994a) and an operable unit-specific FFS document, such as this one. The FFS process is performed by implementing a ''plug-in'' style approach as defined in great detail in the Process Document. The objective of this operable unit-specific FFS is to provide decision makers with sufficient information to allow appropriate and timely selection of interim remedial measures (IRM) for sites associated with the 100-HR-1 Operable Unit. The IRM candidate waste sites are determined in the limited field investigation. Site profiles are developed for each of these waste sites. The site profiles are used in the application of the plug-in approach. The waste site either plugs into the analysis of the alternatives for the group, or deviations from the developed group alternatives are described and documented

  5. Water level measurements for modeling hydraulic properties in the 300-FF-5 and 100 Aggregate Area Operable units

    International Nuclear Information System (INIS)

    Campbell, M.D.; McMahon, W.J.; Simpson, K.R.

    1993-04-01

    Pressure transducers connected to dataloggers were used to measure ground water and Columbia River water elevations simultaneously and hourly at 35 locations in the 300-FF-5 Operable Unit and 16 locations in the 100 Aggregate Area Operable Unit on the Hanford Site. Water temperatures were also measured at 12 of these locations. This report details the findings of these studies

  6. 40 CFR 60.1200 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...

  7. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Woongryol, E-mail: wrlee@nfri.re.kr; Lee, Taegu; Hong, Jaesic

    2016-11-15

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  8. PREMATH: a Precious-Material Holdup Estimator for unit operations and chemical processes

    International Nuclear Information System (INIS)

    Krichinsky, A.M.; Bruns, D.D.

    1982-01-01

    A computer program, PREMATH (Precious Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. PREMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels - including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, PREMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balances for thorium (a less valuable material than uranium) during steady-state process operation

  9. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Science.gov (United States)

    Aguirre, Erik

    2018-01-01

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework. PMID:29382148

  10. Development of a processor embedded timing unit for the synchronized operation in KSTAR

    International Nuclear Information System (INIS)

    Lee, Woongryol; Lee, Taegu; Hong, Jaesic

    2016-01-01

    Highlights: • Timing board for the synchronized tokamak operation. • Processor embedded distributed control system. • Single clock source and multiple trigger signal for the plasma diagnostics. • Delay compensation among the distributed timing boards. - Abstract: The Local Timing Unit (LTU) in KSTAR provides a single clock source and multiple trigger signals with flexible configuration. Over the past seven years, the LTU had a mechanical redesign and several firmware updates for the purpose of provision of a robust operation and precision timing signal. Now we have developed a third version of a local timing unit which has a standalone operation capability. The LTU is built in a cabinet mountable 1U PIZZA box and provides twelve signal output ports, a packet mirroring interface, and an LCD interface panel. The core functions of the LTU are implemented in a Field Programmable Gate Array (FPGA) which has an internal hardcore processor. The internal processor allows the use of Linux Operating System (OS) and the Experimental Physics and Industrial Control System (EPICS). All user level application functions are controllable through the EPICS, however the time critical internal functions are performed by the FPGA logic blocks same as the previous version. The new LTU provides pluggable output module so that we can easily extend the signal output port. The easy installation and effective replacement reduce the efforts of maintenance. This paper describes design, development, and commissioning results of the new KSTAR LTU.

  11. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context

    Directory of Open Access Journals (Sweden)

    Peio Lopez-Iturri

    2018-01-01

    Full Text Available In the context of hospital management and operation, Intensive Care Units (ICU are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  12. Implementation and Operational Analysis of an Interactive Intensive Care Unit within a Smart Health Context.

    Science.gov (United States)

    Lopez-Iturri, Peio; Aguirre, Erik; Trigo, Jesús Daniel; Astrain, José Javier; Azpilicueta, Leyre; Serrano, Luis; Villadangos, Jesús; Falcone, Francisco

    2018-01-29

    In the context of hospital management and operation, Intensive Care Units (ICU) are one of the most challenging in terms of time responsiveness and criticality, in which adequate resource management and signal processing play a key role in overall system performance. In this work, a context aware Intensive Care Unit is implemented and analyzed to provide scalable signal acquisition capabilities, as well as to provide tracking and access control. Wireless channel analysis is performed by means of hybrid optimized 3D Ray Launching deterministic simulation to assess potential interference impact as well as to provide required coverage/capacity thresholds for employed transceivers. Wireless system operation within the ICU scenario, considering conventional transceiver operation, is feasible in terms of quality of service for the complete scenario. Extensive measurements of overall interference levels have also been carried out, enabling subsequent adequate coverage/capacity estimations, for a set of Zigbee based nodes. Real system operation has been tested, with ad-hoc designed Zigbee wireless motes, employing lightweight communication protocols to minimize energy and bandwidth usage. An ICU information gathering application and software architecture for Visitor Access Control has been implemented, providing monitoring of the Boxes external doors and the identification of visitors via a RFID system. The results enable a solution to provide ICU access control and tracking capabilities previously not exploited, providing a step forward in the implementation of a Smart Health framework.

  13. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  14. On an Integral-Type Operator Acting between Bloch-Type Spaces on the Unit Ball

    Directory of Open Access Journals (Sweden)

    Stevo Stević

    2010-01-01

    Full Text Available Let 𝔹 denote the open unit ball of ℂn. For a holomorphic self-map φ of 𝔹 and a holomorphic function g in 𝔹 with g(0=0, we define the following integral-type operator: Iφgf(z=∫01ℜf(φ(tzg(tz(dt/t, z∈𝔹. Here ℜf denotes the radial derivative of a holomorphic function f in 𝔹. We study the boundedness and compactness of the operator between Bloch-type spaces ℬω and ℬμ, where ω is a normal weight function and μ is a weight function. Also we consider the operator between the little Bloch-type spaces ℬω,0 and ℬμ,0.

  15. Operation of Beaver Valley Power Station, Unit 2, Docket No. 50-412, Beaver County, Pennsylvania

    International Nuclear Information System (INIS)

    1985-09-01

    The final environmental impact statement (EPA No. 850438F) assesses the effects of operating a pressurized water reactor in Pennsylvania on the south bank of the Ohio River, which would serve as the final heat sink for the cooling system. Operation of Unit 2 would add 836 MW of capacity and increase system reliability. The plant would employ 465 at an $18 million payroll. Facilities for the plant would take up 56 acres of agricultural land. The operation result in both water and noise pollution. There is only a small probability of impacts due to potential radiation exposure. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Regulations require the impact statement

  16. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  17. Regulating manure application discharges from concentrated animal feeding operations in the United States

    International Nuclear Information System (INIS)

    Centner, Terence J.; Feitshans, Theodore A.

    2006-01-01

    In the United States, reducing pollution from agriculture has received attention due to data suggesting that this is the leading source of impairment of many waterbodies. The federal government revised its regulations governing concentrated animal feeding operations (CAFOs) to enhance governmental oversight over sources of pollution. For the application of manure resulting in pollutant discharges, CAFOs need to implement nutrient management plans. A federal court affirmed the ability of the US federal government to oversee the application of manure from CAFOs that have discharges. Simultaneously, owners and operators of CAFOs who have implemented an appropriate nutrient management plan may forgo securing a permit if their discharges qualify under the agricultural stormwater discharge exemption. - New rules applying to the application of manure by large concentrated animal feeding operations should reduce water contamination

  18. The Evolving Contingency Contracting Market: Private Sector Self regulation and United States Government Monitoring of Procurement of Stability Operations Services

    Science.gov (United States)

    2016-01-01

    statements of work would be useful in ensuring ethical govern- ment procurement practices. Conclusions The United States conducts diplomatic, defense...THE EVOLVING CONTINGENCY CONTRACTING MARKET: PRIVATE SECTOR SELF-REGULATION AND UNITED STATES GOVERNMENT MONITORING OF PROCUREMENT OF STABILITY...MARKET: PRIVATE SECTOR SELF-REGULATION AND UNITED STATES GOVERNMENT MONITORING OF PROCUREMENT OF STABILITY OPERATIONS SERVICES Whitney Grespin January

  19. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC)

    OpenAIRE

    Mohammad Javad Abdollahi; Majid Moazzami

    2015-01-01

    In this paper security constraints unit commitment (SCUC) in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested...

  20. Development of in situ product removal strategies in biocatalysis applying scaled-down unit operations.

    Science.gov (United States)

    Heintz, Søren; Börner, Tim; Ringborg, Rolf H; Rehn, Gustav; Grey, Carl; Nordblad, Mathias; Krühne, Ulrich; Gernaey, Krist V; Adlercreutz, Patrick; Woodley, John M

    2017-03-01

    An experimental platform based on scaled-down unit operations combined in a plug-and-play manner enables easy and highly flexible testing of advanced biocatalytic process options such as in situ product removal (ISPR) process strategies. In such a platform, it is possible to compartmentalize different process steps while operating it as a combined system, giving the possibility to test and characterize the performance of novel process concepts and biocatalysts with minimal influence of inhibitory products. Here the capabilities of performing process development by applying scaled-down unit operations are highlighted through a case study investigating the asymmetric synthesis of 1-methyl-3-phenylpropylamine (MPPA) using ω-transaminase, an enzyme in the sub-family of amino transferases (ATAs). An on-line HPLC system was applied to avoid manual sample handling and to semi-automatically characterize ω-transaminases in a scaled-down packed-bed reactor (PBR) module, showing MPPA as a strong inhibitor. To overcome the inhibition, a two-step liquid-liquid extraction (LLE) ISPR concept was tested using scaled-down unit operations combined in a plug-and-play manner. Through the tested ISPR concept, it was possible to continuously feed the main substrate benzylacetone (BA) and extract the main product MPPA throughout the reaction, thereby overcoming the challenges of low substrate solubility and product inhibition. The tested ISPR concept achieved a product concentration of 26.5 g MPPA  · L -1 , a purity up to 70% g MPPA  · g tot -1 and a recovery in the range of 80% mol · mol -1 of MPPA in 20 h, with the possibility to increase the concentration, purity, and recovery further. Biotechnol. Bioeng. 2017;114: 600-609. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  1. The nuclear industry's transition to risk-informed regulation and operation in the United States

    International Nuclear Information System (INIS)

    Kadak, Andrew C.; Matsuo, Toshihiro

    2007-01-01

    This paper summarizes a study of the transition of the United States nuclear industry from a prescriptive regulatory structure to a more risk informed approach to operations and regulations. The transition occurred over a 20 yr period in which gradual changes were made in the fundamental regulations and to the approach to nuclear safety and operations. While the number of actual regulatory changes were few, they are continuing. The utilities that embraced risk informed operations made dramatic changes in the way they approached operations and outage management. Those utilities that used risk in operations showed dramatic improvement in safety based on Institute of Nuclear Power Operations (INPO) performance indicators. It was also shown that the use of risk did not negatively affect safety performance of the plants compared to standard prescriptive approaches. This was despite having greater flexibility in compliance to regulatory standards and the use of the newly instituted risk-informed reactor oversight process. Key factors affecting the successful transition to a more risk-informed approach to regulations and operations are: strong top management support and leadership both at the regulator and the utility; education and training in risk principles and probabilistic risk Assessment tools for engineers, operators and maintenance staff; a slow and steady introduction of risk initiatives in areas that can show value to both the regulator and the industry; a transparent regulatory foundation built around a safety goal policy and the development of a strong safety culture at the utility to allow for more independence in safety compliance and risk management. The experience of the United States shows positive results in both safety and economics. The INPO and NRC metrics presented show that the use of risk information in operations and regulation is marginally better with no degradation in safety when plants that have embraced risk-informed approaches are compared

  2. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    International Nuclear Information System (INIS)

    1975-01-01

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  3. Unit operations used to treat process and/or waste streams at nuclear power plants

    International Nuclear Information System (INIS)

    Godbee, H.W.; Kibbey, A.H.

    1980-01-01

    Estimates are given of the annual amounts of each generic type of LLW [i.e., Government and commerical (fuel cycle and non-fuel cycle)] that is generated at LWR plants. Many different chemical engineering unit operations used to treat process and/or waste streams at LWR plants include adsorption, evaporation, calcination, centrifugation, compaction, crystallization, drying, filtration, incineration, reverse osmosis, and solidification of waste residues. The treatment of these various streams and the secondary wet solid wastes thus generated is described. The various treatment options for concentrates or solid wet wastes, and for dry wastes are discussed. Among the dry waste treatment methods are compaction, baling, and incineration, as well as chopping, cutting and shredding. Organic materials [liquids (e.g., oils or solvents) and/or solids], could be incinerated in most cases. The filter sludges, spent resins, and concentrated liquids (e.g., evaporator concentrates) are usually solidified in cement, or urea-formaldehyde or unsaturated polyester resins prior to burial. Incinerator ashes can also be incorporated in these binding agents. Asphalt has not yet been used. This paper presents a brief survey of operational experience at LWRs with various unit operations, including a short discussion of problems and some observations on recent trends

  4. Fessenheim 2: ASN's green light for continuing operation - Beginning of the works for unit 1

    International Nuclear Information System (INIS)

    Anon.

    2013-01-01

    Every 10 years a nuclear power plant operator has to make a re-assessment of the nuclear safety standard of his plant. This re-assessment is made of 2 parts: first the review of the safety conformity and secondly a thorough re-examination of the safety that takes into account today's safety standards and feedback experience from similar plants. This detailed assessment of the safety aims at checking that the consequences of the different aging phenomena are well mastered for the next 10 years at least. At the end of this re-assessment, the ASN (French Nuclear Safety Authorities) decide or not the continuation of plant activity or can prescribe safety improvements. In the case of the unit 2 of the Fessenheim plant that has just finished its third decennial safety re-assessment, the ASN has prescribed the same improvements as for the unit 1, that is to say the reinforcement of the resistance to corium of the foundation raft and an improvement on the emergency cooling system. The works on the unit 1 have begun despite contestation from anti-nuclear associations that question the cost of the safety upgrading (20 to 30 millions euros) while the unit is expected to be decommissioned by end 2016. (A.C.)

  5. Scale-up of a mixer-settler extractor using a unit operations approach

    International Nuclear Information System (INIS)

    Lindholm, D.C.; Bautista, R.G.

    1976-01-01

    The results of scale-up studies on a continuous, multistage horizontal mixer-settler extractor are presented. The chemical and mechanical system involves the separation of lanthanum from a mixture of rare earth chlorides using di(2-ethylhexyl) phosphoric acid as the solvent and dilute HCl as a scrub solution in a bench scale extractor. Each stage has a hold-up of 2.6 l. A single stage unit is utilized for scale-up studies. Results are obtained on four sizes of geometrically similar units, the largest being six times the volume of the original bench size. A unit operations technique is chosen so that mixing and settling can be examined independently. Variables examined include type of continuous phase, flow rate of inlet streams, and power input to the mixer. Inlet flow-rate ratios are kept constant for all tests. Two potential methods of unbaffled pump-mixer scale-up are explored; the maintenance of constant impeller tip speed and constant power input. For the settler, the previously successful method of basing design on constant flow-rate per unit cross-sectional area is used

  6. Multiobjective Optimization of a Counterrotating Type Pump-Turbine Unit Operated at Turbine Mode

    Directory of Open Access Journals (Sweden)

    Jin-Hyuk Kim

    2014-05-01

    Full Text Available A multiobjective optimization for improving the turbine output and efficiency of a counterrotating type pump-turbine unit operated at turbine mode was carried out in this work. The blade geometry of both the runners was optimized using a hybrid multiobjective evolutionary algorithm coupled with a surrogate model. Three-dimensional Reynolds-averaged Navier-Stokes equations with the shear stress transport turbulence model were discretized by finite volume approximations and solved on hexahedral grids to analyze the flow in the pump-turbine unit. As major hydrodynamic performance parameters, the turbine output and efficiency were selected as objective functions with two design variables related to the hub profiles of both the runner blades. These objectives were numerically assessed at twelve design points selected by Latin hypercube sampling in the design space. Response surface approximation models for the objectives were constructed based on the objective function values at the design points. A fast nondominated sorting genetic algorithm for the local search coupled with the response surface approximation models was applied to determine the global Pareto-optimal solutions. The trade-off between the two objectives was determined and described with respect to the Pareto-optimal solutions. The results of this work showed that the turbine outputs and efficiencies of optimized pump-turbine units were simultaneously improved in comparison to the reference unit.

  7. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  8. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

    Science.gov (United States)

    Madura, John T.; Bauman, William H.; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2010-01-01

    The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards

  9. Rate of generation of tritium during the operation of Tsuruga Power Station Unit No. 2

    International Nuclear Information System (INIS)

    Funamoto, Hisao; Yoshinari, Masaharu; Fukuda, Masayuki; Makino, Shinichi; Watari, Tuneo

    1994-01-01

    Total amount of 3 H activity in primary coolant due to the operation of Tsuruga Power Station Unit No. 2 was estimated. The 3 H inventory was measured for samples from the spent fuel pool, primary coolant and miscellaneous tanks. From the result of the measurement and the data of environmental release of 3 H, the rate of generation of 3 H in the reactor was found to be 25 TBq/GWa. Since Tsuruga Power Station Unit No. 2 is a PWR type reactor, we presume that most of the 3 H in primary coolant is formed by 10 B(n, 2α) 3 H reaction. It is necessary to release about 23 TBq/GWa of 3 H to maintain the station inventory at the present level. (author)

  10. Cooling unit for a superconducting power cable. Two years successful operation

    Energy Technology Data Exchange (ETDEWEB)

    Herzog, Friedhelm [Messer Group GmbH, Krefeld (Germany); Kutz, Thomas [Messer Industriegase GmbH, Bad Soden (Germany); Stemmle, Mark [Nexans Deutschland GmbH, Hannover (Germany); Kugel, Torsten [Westnetz GmbH, Essen (Germany)

    2016-07-01

    High temperature super conductors (HTS) can efficiently be cooled with liquid nitrogen down to a temperature of 64 K (-209 C). Lower temperatures are not practical, because nitrogen becomes solid at 63 K (-210 C). To achieve this temperature level the coolant has to be vaporized below atmospheric pressure. Messer has developed a cooling unit with an adequate vacuum subcooler, a liquid nitrogen circulation system, and a storage vessel for cooling an HTS power cable. The cooling unit was delivered in 2013 for the German AmpaCity project of RWE Deutschland AG, Nexans and Karlsruhe Institute of Technology. Within this project RWE and Nexans installed the worldwide longest superconducting power cable in the city of Essen, Germany. The cable is in operation since March 10th, 2014.

  11. Selection of Forklift Unit for Warehouse Operation by Applying Multi-Criteria Analysis

    Directory of Open Access Journals (Sweden)

    Predrag Atanasković

    2013-07-01

    Full Text Available This paper presents research related to the choice of the criteria that can be used to perform an optimal selection of the forklift unit for warehouse operation. The analysis has been done with the aim of exploring the requirements and defining relevant criteria that are important when investment decision is made for forklift procurement, and based on the conducted research by applying multi-criteria analysis, to determine the appropriate parameters and their relative weights that form the input data and database for selection of the optimal handling unit. This paper presents an example of choosing the optimal forklift based on the selected criteria for the purpose of making the relevant investment decision.

  12. Application of total care time and payment per unit time model for physician reimbursement for common general surgery operations.

    Science.gov (United States)

    Chatterjee, Abhishek; Holubar, Stefan D; Figy, Sean; Chen, Lilian; Montagne, Shirley A; Rosen, Joseph M; Desimone, Joseph P

    2012-06-01

    The relative value unit system relies on subjective measures of physician input in the care of patients. A payment per unit time model incorporates surgeon reimbursement to the total care time spent in the operating room, postoperative in-house, and clinic time to define payment per unit time. We aimed to compare common general surgery operations by using the total care time and payment per unit time method in order to demonstrate a more objective measurement for physician reimbursement. Average total physician payment per case was obtained for 5 outpatient operations and 4 inpatient operations in general surgery. Total care time was defined as the sum of operative time, 30 minutes per hospital day, and 30 minutes per office visit for each operation. Payment per unit time was calculated by dividing the physician reimbursement per case by the total care time. Total care time, physician payment per case, and payment per unit time for each type of operation demonstrated that an average payment per time spent for inpatient operations was $455.73 and slightly more at $467.51 for outpatient operations. Partial colectomy with primary anastomosis had the longest total care time (8.98 hours) and the least payment per unit time ($188.52). Laparoscopic gastric bypass had the highest payment per time ($707.30). The total care time and payment per unit time method can be used as an adjunct to compare reimbursement among different operations on an institutional level as well as on a national level. Although many operations have similar payment trends based on time spent by the surgeon, payment differences using this methodology are seen and may be in need of further review. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  13. Limited field investigation report for the 100-NR-1 Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-NR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land-use scenarios. This report is unique in that it is based on Hanford-specific agreements discussed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992), the Hanford Site Risk Assessment Methodology (DOE-RL 1994a), the Remedial Investigation Feasibility Study Work Plan for the 100-NR-1 Operable Unit (DOE-RL 1992a), and the Hanford Past-Practice Strategy (HPPS) (DOE-RL 1991), and must be viewed in this context. The HPPS emphasizes initiating and completing waste site cleanup through interim actions. The strategy includes paths for interim decision-making and a final remedy-selection process for the operable unit. A LFI report is required, in accordance with the HPPS, when waste sites are to be considered for IRM and existing data are insufficient to formulate a conceptual model or perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify potential contaminant- and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose a risk to human health or the environment that warrants action through IRM

  14. Quality and productivity drive innovation and improvement at United Technologies Aerospace Operations, Inc.

    Science.gov (United States)

    Jamar, L. G.

    1986-01-01

    Quality and innovation are the hallmarks of the national space program. In programs that preceded the Shuttle Program the emphasis was on meeting the risks and technical challenges of space with safety, quality, reliability, and success. At United Technologies Aerospace Operations, Inc. (UTAO), the battle has developed along four primary fronts. These fronts include programs to motivate and reward people, development and construction of optimized processes and facilities, implementation of specifically tailored management systems, and the application of appropriate measurement and control systems. Each of these initiatives is described. However, to put this quality and productivity program in perspective, UTAO and its role in the Shuttle Program are described first.

  15. Status of remedial investigation activities in the Hanford Site 300 Area groundwater operable unit

    International Nuclear Information System (INIS)

    Hulstrom, L.C.; Innis, B.E.; Frank, M.A.

    1993-09-01

    The Phase 1 remedial investigation (RI) and Phase 1 and 2 feasibility studies (FS) for the 300-FF-5 groundwater operable unit underlying the 300 Area on the Hanford Site have been completed. Analysis and evaluation of soil, sediment, and surface water, and biotic sampling data, groundwater chemistry, and radiological data gathered over the past 3 years has been completed. Risk assessment calculations have been performed. Use of the data gathered, coupled with information from an automated water level data collection system, has enabled engineers to track three plumes that represent the most significant contamination of the groundwater

  16. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  17. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  18. Edwin I. Hatch Nuclear Plant, Unit 1. Semiannual operating report, September 12--December 31, 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Hatch-1 achieved initial criticality on September 12, 1974, and initial synchronization on November 11, 1974. The unit is a BWR of 813 MW(e) and has generated 50,775.6 MWH since September 12 with the generator on line 865.62 hours. Net plant efficiency was 20.88 percent with plant availability of 28.32 percent. Information is presented concerning operations, changes, tests, safety related maintenance, primary coolant chemistry, occupational personnel radiation doses, and radioactive effluent releases. (U.S.)

  19. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  20. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  1. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  2. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    Combat/operational stress control, defined as programs and policies to prevent, identify, and manage adverse combat/operational stress reactions, is the primary responsibility of military commanders...

  3. Overview of the Habitat Demonstration Unit Power System Integration and Operation at Desert RATS 2010

    Science.gov (United States)

    Colozza, Anthony J.; George, Pat; Gambrell, Ronnie; Chapman, Chris

    2013-01-01

    A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.

  4. Solving optimum operation of single pump unit problem with ant colony optimization (ACO) algorithm

    International Nuclear Information System (INIS)

    Yuan, Y; Liu, C

    2012-01-01

    For pumping stations, the effective scheduling of daily pump operations from solutions to the optimum design operation problem is one of the greatest potential areas for energy cost-savings, there are some difficulties in solving this problem with traditional optimization methods due to the multimodality of the solution region. In this case, an ACO model for optimum operation of pumping unit is proposed and the solution method by ants searching is presented by rationally setting the object function and constrained conditions. A weighted directed graph was constructed and feasible solutions may be found by iteratively searching of artificial ants, and then the optimal solution can be obtained by applying the rule of state transition and the pheromone updating. An example calculation was conducted and the minimum cost was found as 4.9979. The result of ant colony algorithm was compared with the result from dynamic programming or evolutionary solving method in commercial software under the same discrete condition. The result of ACO is better and the computing time is shorter which indicates that ACO algorithm can provide a high application value to the field of optimal operation of pumping stations and related fields.

  5. Operation time extension for power units of the first generation NPP and the liability for potential damage

    International Nuclear Information System (INIS)

    Kovalevich, O.M.

    2000-01-01

    The problem on the operation time extension for the six operating NPP first generation power units is discussed. However it is not advisable to improve the safety of these power units up to the acceptable level, therefore there arises the contradiction between the operation time extension of these power units and potential damage for the population. The possibility of having the increased civilian-legal responsibility for potential harm and losses in case of an accident is proposed to be considered as a compensating measure. The measures for realization of this civilian-legal responsibility are described [ru

  6. Ergonomic relationship during work in nursing staff of intensive care unit with operating room

    Directory of Open Access Journals (Sweden)

    Yousef Mahmoudifar

    2017-01-01

    Full Text Available Background and Objectives: High prevalence of work-related musculoskeletal disorders, especially in jobs such as nursing which covers tasks like patients' repositioning, has attracted great attentions from occupational healthcare experts to necessitate the knowledge of ergonomic science. Therefore, this study was performed aiming at ergonomic relationship during work in nursing staff of Intensive Care Unit (ICU with operating room. Materials and Methods: In this descriptive-analytical study (cohort, fifty personnel of ICU staff and fifty of operating room staff were selected through a census method and were assessed using tools such as Nordic questionnaire and Rapid Entire Body Assessment (REBA standards in terms of body posture ergonomics. The obtained data were analyzed by SPSS software and Chi-Square test after collection. Results: The most complaints were from the operating room group (68% and ICU staff (60% for the lumbar musculoskeletal system. There was a significant relationship between the total REBA scores of body, legs, neck, arm, force status, load fitting with hands and static or dynamic activities in the operating room and ICU staff groups (P < 0.05. In operating room and ICU groups, most subjects obtained score 11–15 and very high-risk level. Conclusion: Nurses working at operating room and ICU ward are subjected to high-risk levels and occupational injuries which is dramatically resulted from inappropriate body posture or particular conditions of their works. As a result, taking corrective actions along with planning and identifying ways will help prohibiting the prevalence of disorders in the future.

  7. Screening of Potential Remediation Methods for the 200-ZP-1 Operable Unit at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Nimmons, Michael J.; Johnson, Christian D.; Dresel, P EVAN.; Murray, Christopher J.

    2006-08-07

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-ZP-1 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final. The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers). COC with similar properties were grouped for the screening evaluation. The screening evaluation was conducted in two primary steps. The initial screening step evaluated potential remediation methods based on whether they can be effectively applied within the environmental setting of the 200-ZP-1 Operable Unit for the specified contaminants. In the second step, potential remediation methods were screened using scoping calculations to estimate the scale of infrastructure, overall quantities of reagents, and conceptual approach for applying the method for each defined grouping of COC. Based on these estimates, each method was screened with respect to effectiveness, implementability, and relative cost categories of the CERCLA feasibility study screening process defined in EPA guidance.

  8. 76 FR 77528 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2011-12-13

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  9. 76 FR 79678 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2011-12-22

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  10. 77 FR 123 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2012-01-03

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling party: Waste Management Recycling & Disposal Services of California, Inc., dba Bradley Landfill & Recycling Center. The settlement requires the settling party to pay a total of $185,734 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling party pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  11. Explicit isospectral flows associated to the AKNS operator on the unit interval. II

    Science.gov (United States)

    Amour, Laurent

    2012-10-01

    Explicit flows associated to any tangent vector fields on any isospectral manifold for the AKNS operator acting in L2 × L2 on the unit interval are written down. The manifolds are of infinite dimension (and infinite codimension). The flows are called isospectral and also are Hamiltonian flows. It is proven that they may be explicitly expressed in terms of regularized determinants of infinite matrix-valued functions with entries depending only on the spectral data at the starting point of the flow. The tangent vector fields are decomposed as ∑ξkTk where ξ ∈ ℓ2 and the Tk ∈ L2 × L2 form a particular basis of the tangent vector spaces of the infinite dimensional manifold. The paper here is a continuation of Amour ["Explicit isospectral flows for the AKNS operator on the unit interval," Inverse Probl. 25, 095008 (2009)], 10.1088/0266-5611/25/9/095008 where, except for a finite number, all the components of the sequence ξ are zero in order to obtain an explicit expression for the isospectral flows. The regularized determinants induce counter-terms allowing for the consideration of finite quantities when the sequences ξ run all over ℓ2.

  12. Phase I and II feasibility study report for the 300-FF-5 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018.

  13. Report on geological surveys in the 300-FF-1 operable unit

    International Nuclear Information System (INIS)

    Sandness, G.A.

    1991-03-01

    This report describes a set of geophysical surveys performed by the Pacific Northwest Laboratory at selected locations within the 300-FF-1 Operable Unit at Hanford. Field work and preliminary data processing activities were initiated in September 1989. These actions were terminated by the Westinghouse Hanford Company before completion in December 1989. Work was reinitiated in October 1990, to complete the processing of the data that had already been collected and to report the results. Because the field work was only partially completed, the task objectives, as presented in the Statement of Work, could not be fully met. This report is, therefore, a progress report covering the work performed through December 11, 1989. This task involved (1) ground-penetrating radar surveys of the 618-4 and 618-5 Burial Grounds, and (2) ground-penetrating radar and electromagnetic induction surveys along the assumed routes of the abandoned process sewers and radioactive liquid waste sewers in the 300-FF-1 Operable Unit. The surveys in the burial grounds were intended to identify burial trenches and pits, to determine the depth of fill, and to locate waste materials, including any that might be outside the perimeter fences. The surveys along the sewer routes were intended, first, to confirm the locations of the sewers as shown on existing maps or to otherwise accurately determine their locations, and second, to attempt to identify locations of possible leaks. 3 refs., 3 figs., 2 tabs

  14. Phase I and II feasibility study report for the 300-FF-5 operable unit

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018

  15. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  16. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  17. ENHANCING THE OPERATIONAL EFFICIENCY OF DIRECT CURRENT DRIVE BASED ON USE OF SUPERCONDENSER POWER STORAGE UNITS

    Directory of Open Access Journals (Sweden)

    А. M. Mukha

    2017-10-01

    Full Text Available Purpose.The scientific work is intended to analyse the expansion of the load range and the implementation of regeneration braking (RB of the direct current drive by using the supercondenser power storage units. Methodology.To solve the problem, we use the methods of the electric drive theory, impulse electronics and the method of calculation of transient electromagnetic processes in linear electric circuits in the presence of super-condensers therein. Findings.The stiffness of the mechanical and electromechanical characteristics of a series motor is significantly increased, which makes it possible to use a DC drive under load, much smaller than 15…20% of the nominal one. Numerical calculations of the operation process of the supercondenser power storage unit were fulfilled with a sharp decrease in the load of a traction electric motor of a direct current electric locomotive. The possibility of RB of the direct current drive with the series motor is substantiated. The equations of the process of charging and discharging of super-condenser storage unit in RB mode are solved. The authors examined the effect of capacitance on the nature of maintaining the excitation current of an electric motor in the mode of small loads.Originality.The paper developed theoretical approaches for the transformation of soft (mechanical and electromechanical characteristics into hard ones of DC series motors. For the first time a new, combined method of the series motor RB is proposed and substantiated. Further development obtained the methods for evaluating the storage unit parameters, taking into account the criteria for reliable parallel operation of super-condensers with an electric motor field. Practical value.The proposed and substantiated transformation of soft characteristics into stiff ones allows us to use general-purpose electric drives with series motors and at low loads, and in traction electric drives - to reduce the intensity of electric stockwheel

  18. The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.R.; Heo, T.Y.; Cho, B.H. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of); Kang, T.G.; Kim, H.M.; Kim, Y.S.; Oh, S.M.; Kang, Y.S. [Korea Electric Power Data Network Co., Seoul (Korea, Republic of)

    1997-12-31

    Due to aging of the imported seismic monitoring system of Uljin of t 1 and 2 units it is difficult for this system to provide enough functions needed for the security of seismic safety and the evaluation of the earthquake data from the seismic instrumentation. For this reason, it is necessary to replace the seismic monitoring system of Uljin 1 and 2 units with a new system which has the localized and upgraded hardware and corresponding software. In the part of standardization of existing seismic monitoring system, furthermore, it is necessary to develop the seismic wave analysis system which incorporate newly developed software and can real-timely analyze the seismic wave. This report is the finial product of research project ``The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2`` which have been performed from June 1996 to June 1997 by KEPRI and KDN. Main accomplishments - Review of regulatory criteria for seismic monitoring system -Analysis and upgrade of hardware system -Analysis and upgrade of software system - Development of seismic wave analysis system. (author). 17 refs., 49 figs., 6 tabs.

  19. Combined operation of AC and DC distribution system with distributed generation units

    International Nuclear Information System (INIS)

    Noroozian, R.; Abedi, M.; Gharehpetian, G.

    2010-01-01

    This paper presents a DC distribution system which has been supplied by external AC systems as well as local DG units in order to demonstrate an overall solution to power quality issue. In this paper, the proposed operation method is demonstrated by simulation of power transfer between external AC systems, DG units, AC and DC loads. The power flow control in DC distribution system has been achieved by network converters and DG converters. Also, the mathematical model of the network, DG and load converters are obtained by using the average technique, which allows converter systems accurately simulated and control strategies for this converters is achieved. A suitable control strategy for network converters has been proposed that involves DC voltage droop regulator and novel instantaneous power regulation scheme. Also, a novel control technique has been proposed for DG converters. In this paper, a novel control system based on stationary and synchronously rotating reference frame has been proposed for load converters for supplying AC loads connected to the DC bus by balanced voltages. The several case studies have been studied based on proposed methods. The simulation results show that DC distribution systems including DG units can improve the power quality at the point of common coupling (PCC) in the power distribution system or industrial power system. (authors)

  20. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  1. Smart house-based optimal operation of thermal unit commitment for a smart grid considering transmission constraints

    Science.gov (United States)

    Howlader, Harun Or Rashid; Matayoshi, Hidehito; Noorzad, Ahmad Samim; Muarapaz, Cirio Celestino; Senjyu, Tomonobu

    2018-05-01

    This paper presents a smart house-based power system for thermal unit commitment programme. The proposed power system consists of smart houses, renewable energy plants and conventional thermal units. The transmission constraints are considered for the proposed system. The generated power of the large capacity renewable energy plant leads to the violated transmission constraints in the thermal unit commitment programme, therefore, the transmission constraint should be considered. This paper focuses on the optimal operation of the thermal units incorporated with controllable loads such as Electrical Vehicle and Heat Pump water heater of the smart houses. The proposed method is compared with the power flow in thermal units operation without controllable loads and the optimal operation without the transmission constraints. Simulation results show the validation of the proposed method.

  2. Data collection on the unit control room simulator as a method of operator reliability analysis

    International Nuclear Information System (INIS)

    Holy, J.

    1998-01-01

    The report consists of the following chapters: (1) Probabilistic assessment of nuclear power plant operation safety and human factor reliability analysis; (2) Simulators and simulations as human reliability analysis tools; (3) DOE project for using the collection and analysis of data from the unit control room simulator in human factor reliability analysis at the Paks nuclear power plant; (4) General requirements for the organization of the simulator data collection project; (5) Full-scale simulator at the Nuclear Power Plants Research Institute in Trnava, Slovakia, used as a training means for operators of the Dukovany NPP; (6) Assessment of the feasibility of quantification of important human actions modelled within a PSA study by employing simulator data analysis; (7) Assessment of the feasibility of using the various exercise topics for the quantification of the PSA model; (8) Assessment of the feasibility of employing the simulator in the analysis of the individual factors affecting the operator's activity; and (9) Examples of application of statistical methods in the analysis of the human reliability factor. (P.A.)

  3. Continuous operation of NPP Kori Unit 1 - Fireproof paint for cables

    International Nuclear Information System (INIS)

    Wendt, Dipl-Ing. Ruediger; Kim, Duill; Sik, Cho Hong

    2008-01-01

    Fireproof cable coating materials have been used in European NPP, especially in Germany, Russia, Ukraine, Czech Republic, Lithuania, Switzerland. Wide experiences were made during operation while applying these systems. In NPP Kori, Unit 1, a fire proof cable coating project was realised for the first time in a NPP of KHNP. The scope of services of the cable trays to coat amounts to 15,587m 2 . In different fire compartments and rooms the cables should be coated partially respectively completely with the fire proof cable coating system. The extent of cable surfaces to coat was stipulated by KHNP on the basis of an analysis made by KHNP. The project was tendered on the basis of a technical specification of KHNP. The specification is mainly predicted on Korean and US standards. The most important criteria for the fire proof cable coating is resumed as follows: The fireproof cable coating has to assure the fire protection of the cables for a period defined and for operational conditions defined in such a manner that the general conditions for the operation of the cable installation will not be affected

  4. Geophysical Investigation of the 618-10 and 618-11 Burial Grounds, 300-FF-2 Operable Unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Bolin, D.J.; Mitchell, T.H.

    1997-09-01

    This document summarizes the results of geophysical investigations conducted at two radioactive solid waste burial grounds, 618-10 and 618-11. The burial grounds are located approximately 4.5 miles and 7 miles north of the 300 Area, respectively. These sites are within the 300-FF-2 Operable Unit, where geophysical techniques are being used to characterize the distribution of solid waste in the subsurface as part of the Limited Field Investigations for this operable unit

  5. Operation experience of the advanced fuel assemblies at Unit 1 of Volgodonsk NPP within four fuel cycles

    International Nuclear Information System (INIS)

    Vasilchenko, I.; Kobelev, S.; Kushmanov, S.

    2006-01-01

    The first commissioning of Volgodonsk NPP Unit 1 with standard reactor WWER-1000 (project V-320) was in 2001. The reactor core, starting from the first fuel charge, was arranged completely with Advanced Fuel Assemblies (AFAs). In this way, it is possible to obtain the experience in startup and operation of the core, completely arranged with AFAs, and also to get a possibility of performing the comprehensive check for justification of newly commissioned units and justification of design solutions accepted in the design of reactor core for Taiwan NPP, Bushehr NPP and Kudankulam NPP. The first fuel charge of the Volgodonsk NPP Unit 1 is a reference and unified for Tiawan NPP (V-428), Bushehr NPP (V-446), Kudankulam NPP(V-412) with small differences caused by design features of RP V-320. The first core charge of Unit 1 of Volgodonsk NPP was arranged of 163 AFAs, comprising 61 CPS ARs and 42 BAR bundles. The subsequent fuel charges were arranged of AFAs with gadolinium oxide integrated into fuel instead of BAR. By 2005 the results of operation of the core at Unit 1 of Volgodonsk NPP during four fuel cycles showed that AFA is sufficiently reliable and serviceable. The activity of the primary coolant of the Volgodonsk NPP is at stable low level. During the whole time of the core operation of the Volgodonsk NPP Unit 1 no leaky AFAs were revealed. The modifications of the internals, made during pre-operational work, are reasonable and effective to provide for fuel mechanical stability in the course of operation. The modifications, made in AFA structure during operation of the Volgodonsk NPP Unit 1, are aimed at improving the service and operational reliability of its components. Correctness of the solutions taken is confirmed by AFAs operation experience both at the Volgodonsk NPP, and at other operating Russian NPPs

  6. 40 CFR 60.1690 - What are the operating practice requirements for my municipal waste combustion unit?

    Science.gov (United States)

    2010-07-01

    ... requirements for my municipal waste combustion unit? 60.1690 Section 60.1690 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule-Good Combustion Practices: Operating Requirements § 60.1690 What...

  7. A Formula for the Units to Satisfy an Operation's Desired Rate of Return in CVP Analysis--A Conceptual Approach

    Science.gov (United States)

    Anderson, Johann A.; Leese, Wallace R.

    2016-01-01

    A common formula presented in many managerial- and cost-accounting textbooks makes possible the determination of the quantity of units which must be produced and sold to generate a desired dollar-amount of operating income. This article addresses the question "What formula can be used to determine the quantity of units needed to yield a…

  8. Emissions from oil and gas operations in the United States and their air quality implications.

    Science.gov (United States)

    Allen, David T

    2016-06-01

    The energy supply infrastructure in the United States has been changing dramatically over the past decade. Increased production of oil and natural gas, particularly from shale resources using horizontal drilling and hydraulic fracturing, made the United States the world's largest producer of oil and natural gas in 2014. This review examines air quality impacts, specifically, changes in greenhouse gas, criteria air pollutant, and air toxics emissions from oil and gas production activities that are a result of these changes in energy supplies and use. National emission inventories indicate that volatile organic compound (VOC) and nitrogen oxide (NOx) emissions from oil and gas supply chains in the United States have been increasing significantly, whereas emission inventories for greenhouse gases have seen slight declines over the past decade. These emission inventories are based on counts of equipment and operational activities (activity factors), multiplied by average emission factors, and therefore are subject to uncertainties in these factors. Although uncertainties associated with activity data and missing emission source types can be significant, multiple recent measurement studies indicate that the greatest uncertainties are associated with emission factors. In many source categories, small groups of devices or sites, referred to as super-emitters, contribute a large fraction of emissions. When super-emitters are accounted for, multiple measurement approaches, at multiple scales, produce similar results for estimated emissions. Challenges moving forward include identifying super-emitters and reducing their emission magnitudes. Work done to date suggests that both equipment malfunction and operational practices can be important. Finally, although most of this review focuses on emissions from energy supply infrastructures, the regional air quality implications of some coupled energy production and use scenarios are examined. These case studies suggest that both

  9. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  10. A manned maneuvering unit proximity operations planning and flight guidance display and control system

    Science.gov (United States)

    Gershzohn, Gary R.; Sirko, Robert J.; Zimmerman, K.; Jones, A. D.

    1990-01-01

    This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display

  11. Maintaining reduced noise levels in a resource-constrained neonatal intensive care unit by operant conditioning.

    Science.gov (United States)

    Ramesh, A; Denzil, S B; Linda, R; Josephine, P K; Nagapoornima, M; Suman Rao, P N; Swarna Rekha, A

    2013-03-01

    To evaluate the efficacy of operant conditioning in sustaining reduced noise levels in the neonatal intensive care unit (NICU). Quasi-experimental study on quality of care. Level III NICU of a teaching hospital in south India. 26 staff employed in the NICU. (7 Doctors, 13 Nursing staff and 6 Nursing assistants). Operant conditioning of staff activity for 6 months. This method involves positive and negative reinforcement to condition the staff to modify noise generating activities. Comparing noise levels in decibel: A weighted [dB (A)] before conditioning with levels at 18 and 24 months after conditioning. Decibel: A weighted accounts for noise that is audible to human ears. Operant conditioning for 6 months sustains the reduced noise levels to within 62 dB in ventilator room 95% CI: 60.4 - 62.2 and isolation room (95% CI: 55.8 - 61.5). In the preterm room, noise can be maintained within 52 dB (95% CI: 50.8 - 52.6). This effect is statistically significant in all the rooms at 18 months (P = 0.001). At 24 months post conditioning there is a significant rebound of noise levels by 8.6, 6.7 and 9.9 dB in the ventilator, isolation and preterm room, respectively (P =0.001). Operant conditioning for 6 months was effective in sustaining reduced noise levels. At 18 months post conditioning, the noise levels were maintained within 62 dB (A), 60 dB (A) and 52 dB (A) in the ventilator, isolation and pre-term room, respectively. Conditioning needs to be repeated at 12 months in the ventilator room and at 18 months in the other rooms.

  12. Operator Training and TEMS Support: A Survey of Unit Leaders in Northern and Central California.

    Science.gov (United States)

    Young, Jason B; Galante, Joseph M; Sena, Matthew J

    2013-01-01

    Members of Special Weapons and Tactics (SWAT) teams routinely work in high-risk tactical situations. Awareness of the benefit of Tactical Emergency Medical Support (TEMS) is increasing but not uniformly emphasized. To characterize the current regional state of tactical medicine and identify potential barriers to more widespread implementation. A multiple-choice survey was administered to SWAT team leaders of 22 regional agencies in northern and central California. Questions focused on individual officer self-aid and buddy care training, the use and content of individual first aid kits (IFAKs), and the operational inclusion of a dedicated TEMS provider. Respondents included city police (54%), local county sheriff (36%), state law enforcement (5%), and federal law enforcement (5%). RESULTS showed that 100% of respondents thought it was ?Very Important? for SWAT officers to understand the basics of self-aid and buddy care and to carry an IFAK, while only 71% of respondents indicated that team members actually carried an IFAK. In addition, 67% indicated that tourniquets were part of the IFAK, and 91% of surveyed team leaders thought it was ?Very Important? for teams to have a trained medic available onsite at callouts or high-risk warrant searches. Also, 59% of teams used an organic TEMS element. The majority of SWAT team leaders recognize the benefit of basic Operator medical training and the importance of a TEMS program. Despite near 100% endorsement by unit-level leadership, a significant proportion of teams are lacking one of the key components including Operator IFAKs and/or tourniquets. Tactical team leaders, administrators, and providers should continue to promote adequate Operator training and equipment as well as formal TEMS support. 2013.

  13. United States Army Reserve in Operation Desert Storm. Enemy Prisoner of War Operations: The 800th Military Police Brigade

    Science.gov (United States)

    1992-06-12

    to be somewhat lower than these, but this gives an idea of the allocation of MPs among the various organizations and components. 8 Trained atun Ready...48 Trained atun Ready Twice the Citizen Figure 24. Assignment of MP Units to Customs Inspection Duties (15 April 1991) UNIT LOCATION Task Force

  14. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  15. Final test results for the ground operations demonstration unit for liquid hydrogen

    Science.gov (United States)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  16. Clinical microbiology in the intensive care unit: Strategic and operational characteristics

    Directory of Open Access Journals (Sweden)

    Bhattacharya S

    2010-01-01

    Full Text Available Infection is a major cause of morbidity and mortality among patients admitted in intensive care units (ICUs. The application of the principles and the practice of Clinical Microbiology for ICU patients can significantly improve clinical outcome. The present article is aimed at summarising the strategic and operational characteristics of this unique field where medical microbiology attempts to venture into the domain of direct clinical care of critically ill patients. The close and strategic partnership between clinical microbiologists and intensive care specialists, which is essential for this model of patient care have been emphasized. The article includes discussions on a variety of common clinical-microbiological problems faced in the ICUs such as ventilator-associated pneumonia, blood stream infections, skin and soft tissue infection, UTI, infection control, besides antibiotic management.

  17. Eielson Air Force Base operable unit 2 and other areas record of decision

    International Nuclear Information System (INIS)

    Lewis, R.E.; Smith, R.M.

    1994-10-01

    This decision document presents the selected remedial actions and no action decisions for Operable Unit 2 (OU2) at Eielson Air Force Base (AFB), Alaska, chosen in accordance with state and federal regulations. This document also presents the decision that no further action is required for 21 other source areas at Eielson AFB. This decision is based on the administrative record file for this site. OU2 addresses sites contaminated by leaks and spills of fuels. Soils contaminated with petroleum products occur at or near the source of contamination. Contaminated subsurface soil and groundwater occur in plumes on the top of a shallow groundwater table that fluctuates seasonally. These sites pose a risk to human health and the environment because of ingestion, inhalation, and dermal contact with contaminated groundwater. The purpose of this response is to prevent current or future exposure to the contaminated groundwater, to reduce further contaminant migration into the groundwater, and to remediate groundwater

  18. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  19. 300-FF-1 operable unit remedial investigation phase II report: Physical separation of soils treatability study

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report describes the approach and results of physical separations treatability tests conducted at the Hanford Site in the North Process Pond of the 300-FF-1 Operable Unit. Physical separation of soils was identified as a remediation alternative due to the potential to significantly reduce the amount of contaminated soils prior to disposal. Tests were conducted using a system developed at Hanford consisting of modified EPA equipment integrated with screens, hoppers, conveyors, tanks, and pumps from the Hanford Site. The treatability tests discussed in this report consisted of four parts, in which an estimated 84 tons of soil was processed: (1) a pre-test run to set up the system and adjust system parameters for soils to be processed; (2) a baseline run to establish the performance of the system - Test No. 1; (3) a final run in which the system was modified as a result of findings from the baseline run - Test No. 2; and (4) water treatment.

  20. Evaluation of the operational efficiency of pacifying police units in the state of Rio de Janeiro

    Directory of Open Access Journals (Sweden)

    Igor Rosa Dias de Jesus

    2014-05-01

    Full Text Available The Pacification Police Unit (UPP is a new model for public security and policing, aimed at ensuring local security and, above all, reduce, or even, extinguish violent crime linked to drug trafficking, and approach people and police. The purpose of this article is measuring the operational efficiency of all UPPs installed in the state of Rio de Janeiro by the beginning of 2011 by Data Envelopment Analysis (DEA. For this, it was used the CCR model – input-oriented – developed by Charnes, Cooper and Rhodes, which allows an objective assessment of the overall efficiency, identifying the sources of inefficiencies and the needed targets to achieve the efficiency in each UPP. The results converge to a reduction of the amount of policemen in all communities out of the efficiency frontier.

  1. Risk-based decision analysis for the 200-BP-5 groundwater operable unit. Revision 2

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1996-02-01

    This document presents data from a risk analysis that was performed on three groundwater contaminant plumes within the 200-BP-5 Operable Unit. Hypothetical exposure scenarios were assessed based on current and future plume conditions. For current conditions, a hypothetical industrial groundwater scenarios were assumed. The industrial ingestion scenario, which is derived from HSRAM, was not used for drinking water and should not be implied by this risk analysis that the DOE is advocating use of this groundwater for direct human ingestion. Risk was calculated at each monitoring well using the observed radionuclide concentrations in groundwater from that well. The calculated values represent total radiological incremental lifetime cancer risk. Computer models were used to show the analytical flow and transport of contaminants of concern

  2. Geophysical investigation of the 116-H-1 liquid waste disposal trench, 100-HR-1 operable unit

    International Nuclear Information System (INIS)

    Bergstrom, K.A.; Mitchell, T.H.

    1996-04-01

    A geophysical investigation and data integration were conducted for the 116-H-1 Liquid Waste Disposal Trench, which is located in the 100-HR-1 Operable Unit. The 116-H-1 Liquid Waste Disposal Trench is also known as the 107-H Liquid Waste Disposal Trench, the 107-H Rupture Effluent Trench, and the 107-H Trench (Deford and Einan 1995). The trench was primarily used to hold effluent from the 107-H Retention Basin that had become radioactive from contact with ruptured fuel elements. The effluent may include debris from the ruptured fuel elements (Koop 1964). The 116-H-1 Liquid Waste Disposal Trench was also used to hold water and sludge from the 107-H Retention Basin during the basin's deactivation in 1965

  3. Data validation report for the 100-HR-3 Operable Unit first quarter 1994 groundwater sampling data

    Energy Technology Data Exchange (ETDEWEB)

    Biggerstaff, R.L.

    1994-06-24

    Westinghouse-Hanford has requested that a minimum of 20% of the total number of Sample Delivery Groups be validated for the 100-HR-3 Operable Unit First Quarter 1994 Groundwater Sampling Investigation. Therefore, the data from the chemical analysis of twenty-four samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. The samples were analyzed by Thermo-Analytic Laboratories (TMA) and Roy F. Weston Laboratories (WESTON) using US Environmental Protection Agency (EPA) CLP protocols. Sample analyses included: inorganics; and general chemical parameters. Forty-two samples were validated for radiochemical parameters by TMA and Teledyne.

  4. 300-FF-1 operable unit remedial investigation phase II report: Physical separation of soils treatability study

    International Nuclear Information System (INIS)

    1994-04-01

    This report describes the approach and results of physical separations treatability tests conducted at the Hanford Site in the North Process Pond of the 300-FF-1 Operable Unit. Physical separation of soils was identified as a remediation alternative due to the potential to significantly reduce the amount of contaminated soils prior to disposal. Tests were conducted using a system developed at Hanford consisting of modified EPA equipment integrated with screens, hoppers, conveyors, tanks, and pumps from the Hanford Site. The treatability tests discussed in this report consisted of four parts, in which an estimated 84 tons of soil was processed: (1) a pre-test run to set up the system and adjust system parameters for soils to be processed; (2) a baseline run to establish the performance of the system - Test No. 1; (3) a final run in which the system was modified as a result of findings from the baseline run - Test No. 2; and (4) water treatment

  5. Data validation report for the 100-HR-3 Operable Unit first quarter 1994 groundwater sampling data

    International Nuclear Information System (INIS)

    Biggerstaff, R.L.

    1994-01-01

    Westinghouse-Hanford has requested that a minimum of 20% of the total number of Sample Delivery Groups be validated for the 100-HR-3 Operable Unit First Quarter 1994 Groundwater Sampling Investigation. Therefore, the data from the chemical analysis of twenty-four samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. The samples were analyzed by Thermo-Analytic Laboratories (TMA) and Roy F. Weston Laboratories (WESTON) using US Environmental Protection Agency (EPA) CLP protocols. Sample analyses included: inorganics; and general chemical parameters. Forty-two samples were validated for radiochemical parameters by TMA and Teledyne

  6. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  7. Technical challenges in the qualitative ecological risk assessments performed on the Hanford Site operable units

    International Nuclear Information System (INIS)

    Probasco, K.M.

    1994-01-01

    Qualitative Risk Assessments (QRAS) have been selected as the method for providing the risk-driver indications for interim, remedial, and cleanup actions for the Hanford Site operable units' ecological risk assessments. This expedited response action path has been developed for the Hanford Site to facilitate time-critical decisions and generate immediate emergency cleanup actions. Tight budgets and aggressive time schedules are a major factor in the development of the QRA process. The QRA is a quick way to find immediate threats and a good precursor to a full risk assessment. However, numerous technical challenges have been identified with the QRA approach. The QRA approach differs from a baseline risk assessment in several ways. The main differences involve the use of data that have previously been gathered from the site, and the development of a ''bias-for-action'' document that would reveal qualitative risks from the contaminants identified at the operable units. Technical challenges concerning the ecological portion of these QRAs have raised questions about using the ORA for decision-making and may have weakened the validity of its use in the established procedural framework. Challenges involving such issues as the extrapolation of the contaminant data, data validation and screening techniques, receptor selections, and the final risk characterization outcome threaten the feasibility of the QRA as a decision-making tool. This discussion provides insight into resolving technical challenges and may be a ''lessons-learned'' device for those interested in the QRA approach. Ultimately, these challenges are proving to be learning tools for scientists, regulators, and ecologists and are identifying the data gaps and research direction for future ecological baseline risk assessments

  8. Annual Summary Report, February to December 1998, for the 100-HR-3 and 100-KR-4 Pump-and-Treat Operations and Operable Units

    International Nuclear Information System (INIS)

    Boutin, R. J.

    1999-01-01

    This annual summary report discusses the interim remedial actions at the 100-HR-3 and 100-KR-4 Operable Units (OUs) for February 1,1998, through December 31, 1998. This is the second annual summary report that has been submitted for these OUs; the first report was released in April 1998 (DOE-RL 1998). Ongoing annual summaries and performance evaluations of each of the pump-and-treat systems are required by the Remedial Design Report and Remedial Action Work Plan for the 100-HR-3 and 100-KR-4 Groundwater Operable Units' Interim Action (RDR/RAWP) (DOE-RL 1996)

  9. Simulation of operational processes in hospital emergency units as lean healthcare tool

    Directory of Open Access Journals (Sweden)

    Andreia Macedo Gomes

    2017-07-01

    Full Text Available Recently, the Lean philosophy is gaining importance due to a competitive environment, which increases the need to reduce costs. Lean practices and tools have been applied to manufacturing, services, supply chain, startups and, the next frontier is healthcare. Most lean techniques can be easily adapted to health organizations. Therefore, this paper intends to summarize Lean practices and tools that are already being applied in health organizations. Among the numerous techniques and lean tools used, this research highlights the Simulation. Therefore, in order to understand the use of Simulation as a Lean Healthcare tool, this research aims to analyze, through the simulation technique, the operational dynamics of the service process of a fictitious hospital emergency unit. Initially a systematic review of the literature on the practices and tools of Lean Healthcare was carried out, in order to identify the main techniques practiced. The research highlighted Simulation as the sixth most cited tool in the literature. Subsequently, a simulation of a service model of an emergency unit was performed through the Arena software. As a main result, it can be highlighted that the attendants of the built model presented a degree of idleness, thus, they are able to atend a greater demand. As a last conclusion, it was verified that the emergency room is the process with longer service time and greater overload.

  10. Emergy Evaluation of Dwelling Operation in Five Housing Units of Montreal Island, Canada

    Directory of Open Access Journals (Sweden)

    Ricardo Enrique Vega-Azamar

    2017-04-01

    Full Text Available Sustainability of cities and the environmental implications of high resource utilization by the domestic sector are growing concerns related to urban regions. Well-informed urban planning decision-making is an essential tool to help in the task and, for that, an important point to consider is the influence of parameters like residential density and housing typology on the intensity of resource utilization. Emergy synthesis, a life-cycle energy analysis methodological approach that considers the interaction of natural and human-made flows, was used to evaluate the environmental support for dwelling operational stage in five typical present-day housing units on the island of Montreal. As expected, resource utilization, measured as total emergy used, was positively correlated to housing unit size both with respect to number of occupants and dwelling size. Results suggest that variables affecting notably the intensity of resource utilization are per household income and per dweller habitable space and, while a higher income increased per capita emergy in all cases, increasing space availability per resident did not result in a decrease of empower density after 50 m2/person. Future work should consider lower and higher densities and analyses at the scale of blocks, neighborhoods and urban planning zones.

  11. Model for Sucker-Rod Pumping Unit Operating Modes Analysis Based on SimMechanics Library

    Science.gov (United States)

    Zyuzev, A. M.; Bubnov, M. V.

    2018-01-01

    The article provides basic information about the process of a sucker-rod pumping unit (SRPU) model developing by means of SimMechanics library in the MATLAB Simulink environment. The model is designed for the development of a pump productivity optimal management algorithms, sensorless diagnostics of the plunger pump and pumpjack, acquisition of the dynamometer card and determination of a dynamic fluid level in the well, normalization of the faulty unit operation before troubleshooting is performed by staff as well as equilibrium ratio determining by energy indicators and outputting of manual balancing recommendations to achieve optimal power consumption efficiency. Particular attention is given to the application of various blocks from SimMechanics library to take into account the pumpjack construction principal characteristic and to obtain an adequate model. The article explains in depth the developed tools features for collecting and analysis of simulated mechanism data. The conclusions were drawn about practical implementation possibility of the SRPU modelling results and areas for further development of investigation.

  12. Enhancing the ecological and operational characteristics of water treatment units at TPPs based on baromembrane technologies

    Science.gov (United States)

    Chichirova, N. D.; Chichirov, A. A.; Filimonova, A. A.; Saitov, S. R.

    2017-12-01

    The innovative baromembrane technologies for water demineralization were introduced at Russian TPPs more than 25 years ago. While being used in the power engineering industry of Russia, these technologies demonstrated certain advantages over the traditional ion-exchange and thermal technologies of makeup water treatment for steam boilers. Water treatment units based on the baromembrane technology are compact, easy to operate, and highly automated. The experience gained from the use of these units shows that their reliability depends directly on preliminary water treatment. The popular water pretreatment technology with coagulation by aluminum oxychloride proved to be inefficient during the seasonal changes of source water quality that occurs at some stations. The use of aluminum coagulant at pH 8 and higher does not ensure the stable and qualitative pretreatment regime: soluble aluminum forms slip on membranes of the ultrafiltration unit, thereby causing pollution and intoxication as well as leading to structural damages or worsening of mechanical properties of the membranes. The problem of increased pH and seasonal changes of the source water quality can be solved by substitution of the traditional coagulant into a new one. To find the most successful coagulant for water pretreatment, experiments have been performed on both qualitative and quantitative analysis of the content of natural organic matters in the Volga water and their structure. We have developed a software program and measured the concentrations of soluble aluminum and iron salts at different pH values of the source water. The analysis of the obtained results has indicated that iron sulfate at pH 6.0-10.2, in contrast to aluminum oxychloride, is not characterized by increased solubility. Thus, the basic process diagrams of water pretreatment based on baromembrane technologies with pretreatment through coagulation by iron salts and wastewater amount reducing from 60-40 to 5-2% have been introduced for

  13. Limited field investigation report for the 100-HR-1 Operable Unit

    International Nuclear Information System (INIS)

    1994-08-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-HR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA) (WHC 1993a), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. A LFI Report is required, in accordance with the HPPS, when waste sites are to be considered for IRMs. The LFI is an integral part of the remedial investigation/feasibility study (RI/FS) or Resource Conservation and Recovery Act (RCRA) facility investigation/corrective measures study (RFI/CMS) and process and functions as a focused RI or RFI for selection of IRMs. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRMs, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify contaminant- and location-specific applicable or relevant and appropriate requirements (ARA), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose an unacceptable risk that warrants action through IRMs. The 100-HR-1 unit encompasses approximately 100 acres adjacent to the Columbia River shoreline. It contains waste units associated with the original plant facilities constructed to support the H Reactor. The area also contains evaporation basins which received liquid process wastes and nonroutine deposits of chemical wastes from the 300 Area, where fuel elements for the N Reactor were produced

  14. 40 CFR Table 30 to Subpart Uuu of... - Operating Limits for HAP Emissions From Sulfur Recovery Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for HAP Emissions From Sulfur Recovery Units 30 Table 30 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL..., Table 30 Table 30 to Subpart UUU of Part 63—Operating Limits for HAP Emissions From Sulfur Recovery...

  15. 40 CFR Table 9 to Subpart Uuu of... - Operating Limits for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 9 Table 9 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 9 Table 9 to Subpart UUU of Part 63—Operating Limits for Organic HAP Emissions From...

  16. 40 CFR Table 16 to Subpart Uuu of... - Operating Limits for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 16 Table 16 to Subpart UUU of Part 63 Protection of Environment..., Subpt. UUU, Table 16 Table 16 to Subpart UUU of Part 63—Operating Limits for Organic HAP Emissions From...

  17. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  18. Impact of selection of cord blood units from the United States and swiss registries on the cost of banking operations.

    Science.gov (United States)

    Bart, Thomas; Boo, Michael; Balabanova, Snejana; Fischer, Yvonne; Nicoloso, Grazia; Foeken, Lydia; Oudshoorn, Machteld; Passweg, Jakob; Tichelli, Andre; Kindler, Vincent; Kurtzberg, Joanne; Price, Thomas; Regan, Donna; Shpall, Elizabeth J; Schwabe, Rudolf

    2013-02-01

    Over the last 2 decades, cord blood (CB) has become an important source of blood stem cells. Clinical experience has shown that CB is a viable source for blood stem cells in the field of unrelated hematopoietic blood stem cell transplantation. Studies of CB units (CBUs) stored and ordered from the US (National Marrow Donor Program (NMDP) and Swiss (Swiss Blood Stem Cells (SBSQ)) CB registries were conducted to assess whether these CBUs met the needs of transplantation patients, as evidenced by units being selected for transplantation. These data were compared to international banking and selection data (Bone Marrow Donors Worldwide (BMDW), World Marrow Donor Association (WMDA)). Further analysis was conducted on whether current CB banking practices were economically viable given the units being selected from the registries for transplant. It should be mentioned that our analysis focused on usage, deliberately omitting any information about clinical outcomes of CB transplantation. A disproportionate number of units with high total nucleated cell (TNC) counts are selected, compared to the distribution of units by TNC available. Therefore, the decision to use a low threshold for banking purposes cannot be supported by economic analysis and may limit the economic viability of future public CB banking. We suggest significantly raising the TNC level used to determine a bankable unit. A level of 125 × 10(7) TNCs, maybe even 150 × 10(7) TNCs, might be a viable banking threshold. This would improve the return on inventory investments while meeting transplantation needs based on current selection criteria.

  19. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.; Gorton, Alicia M.; Bisping, Lynn E.; Brandenberger, Jill M.; Pino, Christian; Martinez, Dominique M.; Rana, Komal; Wellman, Dawn M.

    2014-11-20

    Prior to the acquisition of land by the U.S. Department of War in February 1943 and the creation of the Hanford Site, the land along the Columbia River was home to over 1000 people. Farming and orchard operations by both homesteaders and commercial organizations were prevalent. Orchard activities and the associated application of lead arsenate pesticide ceased in 1943, when residents were moved from the Hanford Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead arsenate pesticide persist in some locations on the Hanford Site. In 2012, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology established the 100-OL-1 Operable Unit (OU) through the Hanford Federal Facility Agreement and Consent Order, known as the Tri-Party Agreement. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located south of the Columbia River and east of the present-day Vernita Bridge, and extend southeast to the former Hanford townsite. The discontinuous orchard lands within 100-OL-1 OU are approximately 20 km2 (5000 ac). A pilot study was conducted to support the approval of the remedial investigation/feasibility study work plan to evaluate the 100-OL-1 OU. This pilot study evaluated the use of a field portable X-ray fluorescence (XRF) analyzer for evaluating lead and arsenic concentrations on the soil surface as an indicator of lead arsenate pesticide residues in the OU. The objectives of the pilot study included evaluating a field portable XRF analyzer as the analytical method for decision making, estimating the nature and extent of lead and arsenic in surface soils in four decision units, evaluating the results for the purpose of optimizing the sampling approach implemented in the remedial investigation, and collecting information to improve the cost estimate and planning the cultural resources review for sampling activities in the remedial investigation. Based on

  20. Two-Dimensional Simulation of Mass Transfer in Unitized Regenerative Fuel Cells under Operation Mode Switching

    Directory of Open Access Journals (Sweden)

    Lulu Wang

    2016-01-01

    Full Text Available A two-dimensional, single-phase, isothermal, multicomponent, transient model is built to investigate the transport phenomena in unitized regenerative fuel cells (URFCs under the condition of switching from the fuel cell (FC mode to the water electrolysis (WE mode. The model is coupled with an electrochemical reaction. The proton exchange membrane (PEM is selected as the solid electrolyte of the URFC. The work is motivated by the need to elucidate the complex mass transfer and electrochemical process under operation mode switching in order to improve the performance of PEM URFC. A set of governing equations, including conservation of mass, momentum, species, and charge, are considered. These equations are solved by the finite element method. The simulation results indicate the distributions of hydrogen, oxygen, water mass fraction, and electrolyte potential response to the transient phenomena via saltation under operation mode switching. The hydrogen mass fraction gradients are smaller than the oxygen mass fraction gradients. The average mass fractions of the reactants (oxygen and hydrogen and product (water exhibit evident differences between each layer in the steady state of the FC mode. By contrast, the average mass fractions of the reactant (water and products (oxygen and hydrogen exhibit only slight differences between each layer in the steady state of the WE mode. Under either the FC mode or the WE mode, the duration of the transient state is only approximately 0.2 s.

  1. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

  2. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    International Nuclear Information System (INIS)

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR

  3. Operable Unit 1 remedial investigation report, Eielson Air Force Base, Alaska

    International Nuclear Information System (INIS)

    Gilmore, T.J.; Fruland, R.M.; Liikala, T.L.

    1994-06-01

    This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT

  4. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  5. Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Spane, Frank A.

    2010-09-08

    CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

  6. Monticello Mill Tailings Site, Operable Unit lll, Annual Groundwater Report, May 2015 Through April 2016

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Jason [USDOE Office of Legacy Management (LM), Washington, DC (United States); Smith, Fred [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-10-01

    This report provides the annual analysis of water quality restoration progress, cumulative through April 2016, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site, Operable Unit I (OU I), and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. This effectively removed the primary source of groundwater contamination; however, contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern (COC). LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of

  7. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  8. Chapter 3. Coordination and collaboration with interface units. Recommendations and standard operating procedures for intensive care unit and hospital preparations for an influenza epidemic or mass disaster

    NARCIS (Netherlands)

    Joynt, Gavin M.; Loo, Shi; Taylor, Bruce L.; Margalit, Gila; Christian, Michael D.; Sandrock, Christian; Danis, Marion; Leoniv, Yuval; Sprung, Charles L.; Camargo, Ruben; Ceraso, Daniel; Azoulay, Elie; Duguet, Alexandre; Guery, Benoit; Reinhart, Konrad; Adini, Bruria; Barlavie, Yaron; Benin-Goren, Odeda; Cohen, Robert; Klein, Motti; Rubinovitch, Bina; Sonnenblick, Moshe; Steinberg, Avraham; Weissman, Charles; Wolff, Donna; Kesecioglu, Jozef; de Jong, Menno; Moreno, Rui; An, Youzhong; Du, Bin; Joyng, Gavin M.; Colvin, John; Richards, Guy; Artigas, Antonio; Pugin, Jerome; Amundson, Dennis; Devereaux, Asha; Beigel, John; Farmer, Chris; Hick, John L.; Maki, Dennis; Masur, Henry; Rubinson, Lewis; Talmor, Daniel; Truog, Robert; Zimmerman, Janice; Brett, Steve; Montgomery, Hugh; Rhodes, Andrew; Sanderson, Frances

    2010-01-01

    To provide recommendations and standard operating procedures (SOPs) for intensive care unit (ICU) and hospital preparations for an influenza pandemic or mass disaster with a specific focus on enhancing coordination and collaboration between the ICU and other key stakeholders. Based on a literature

  9. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    Energy Technology Data Exchange (ETDEWEB)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986

  10. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  11. Day-Ahead Coordination of Vehicle-to-Grid Operation and Wind Power in Security Constraints Unit Commitment (SCUC

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Abdollahi

    2015-08-01

    Full Text Available In this paper security constraints unit commitment (SCUC in the presence of wind power resources and electrical vehicles to grid is presented. SCUC operation prepare an optimal time table for generation unit commitment in order to maximize security, minimize operation cost and satisfy the constraints of networks and units in a period of time, as one of the most important research interest in power systems. Today, the relationship between power network and energy storage systems is interested for many researchers and network operators. Using Electrical Vehicles (PEVs and wind power for energy production is one of the newest proposed methods for replacing fossil fuels.One of the effective strategies for analyzing of the effects of Vehicle 2 Grid (V2G and wind power in optimal operation of generation is running of SCUC for power systems that are equipped with V2G and wind power resources. In this paper, game theory method is employed for deterministic solution of day-ahead unit commitment with considering security constraints in the simultaneous presence of V2G and wind power units. This problem for two scenarios of grid-controlled mode and consumer-controlled mode in three different days with light, medium and heavy load profiles is analyzed. Simulation results show the effectiveness of the presence of V2G and wind power for decreasing of generation cost and improving operation indices of power systems.

  12. Developing a Comprehensive Model of Intensive Care Unit Processes: Concept of Operations.

    Science.gov (United States)

    Romig, Mark; Tropello, Steven P; Dwyer, Cindy; Wyskiel, Rhonda M; Ravitz, Alan; Benson, John; Gropper, Michael A; Pronovost, Peter J; Sapirstein, Adam

    2015-04-23

    This study aimed to use a systems engineering approach to improve performance and stakeholder engagement in the intensive care unit to reduce several different patient harms. We developed a conceptual framework or concept of operations (ConOps) to analyze different types of harm that included 4 steps as follows: risk assessment, appropriate therapies, monitoring and feedback, as well as patient and family communications. This framework used a transdisciplinary approach to inventory the tasks and work flows required to eliminate 7 common types of harm experienced by patients in the intensive care unit. The inventory gathered both implicit and explicit information about how the system works or should work and converted the information into a detailed specification that clinicians could understand and use. Using the ConOps document, we created highly detailed work flow models to reduce harm and offer an example of its application to deep venous thrombosis. In the deep venous thrombosis model, we identified tasks that were synergistic across different types of harm. We will use a system of systems approach to integrate the variety of subsystems and coordinate processes across multiple types of harm to reduce the duplication of tasks. Through this process, we expect to improve efficiency and demonstrate synergistic interactions that ultimately can be applied across the spectrum of potential patient harms and patient locations. Engineering health care to be highly reliable will first require an understanding of the processes and work flows that comprise patient care. The ConOps strategy provided a framework for building complex systems to reduce patient harm.

  13. Operational Stress Control and Readiness (OSCAR): The United States Marine Corps Initiative to Deliver Mental Health Services to Operating Forces

    National Research Council Canada - National Science Library

    Nash, William P

    2006-01-01

    .... The role of military mental health professionals in combat/operational stress control is to adapt scientific tools for prevention, identification, and treatment for use by military leaders at all levels...

  14. Operating room fire prevention: creating an electrosurgical unit fire safety device.

    Science.gov (United States)

    Culp, William C; Kimbrough, Bradly A; Luna, Sarah; Maguddayao, Aris J

    2014-08-01

    To reduce the incidence of surgical fires. Operating room fires represent a potentially life-threatening hazard and are triggered by the electrosurgical unit (ESU) pencil. Carbon dioxide is a fire suppressant and is a routinely used medical gas. We hypothesize that a shroud of protective carbon dioxide covering the tip of the ESU pencil displaces oxygen, thereby preventing fire ignition. Using 3-dimensional modeling techniques, a polymer sleeve was created and attached to an ESU pencil. This sleeve was connected to a carbon dioxide source and directed the gas through multiple precisely angled ports, generating a cone of fire-suppressive carbon dioxide surrounding the active pencil tip. This device was evaluated in a flammability test chamber containing 21%, 50%, and 100% oxygen with sustained ESU activation. The sleeve was tested with and without carbon dioxide (control) until a fuel was ignited or 30 seconds elapsed. Time to ignition was measured by high-speed videography. Fires were ignited with each control trial (15/15 trials). The control group median ± SD ignition time in 21% oxygen was 3.0 ± 2.4 seconds, in 50% oxygen was 0.1 ± 1.8 seconds, and in 100% oxygen was 0.03 ± 0.1 seconds. No fire was observed when the fire safety device was used in all concentrations of oxygen (0/15 trials; P fire ignition was 76% to 100%. A sleeve creating a cone of protective carbon dioxide gas enshrouding the sparks from an ESU pencil effectively prevents fire in a high-flammability model. Clinical application of this device may reduce the incidence of operating room fires.

  15. Remedial investigation/feasibility study report for lower Watts Bar Reservoir Operable Unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the Lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch River. This area has received hazardous substances released over a period of 50 years from the U.S. Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received containments, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. Water-soluble contaminants released to ORR surface waters are rapidly diluted upon entering the Clinch River and then quickly transported downstream to the Tennessee River where further dilution occurs. Almost the entire quantity of these diluted contaminants rapidly flows through LWBR. In contrast, particle-associated contaminants tend to accumulate in the lower Clinch River and in LWBR in areas of sediment deposition. Those particle-associated contaminants that were released in peak quantities during the early years of ORR operations (e.g., mercury and 137 Cs) are buried under as much as 80 cm of cleaner sediment in LWBR. Certain contaminants, most notably polychlorinated biphenyls (PCBs), have accumulated in LWBR biota. The contamination of aquatic biota with PCBs is best documented for certain fish species and extends to reservoirs upstream of the ORR, indicating a contamination problem that is regional in scope and not specific to the ORR

  16. GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD, SITE WASHINGTON, USA - 11507

    International Nuclear Information System (INIS)

    Smoot, J.L.; Biebesheimer, F.H.; Eluskie, J.A.; Spiliotopoulos, A.; Tonkin, M.J.; Simpkin, T.

    2011-01-01

    The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km 2 (2.7 mi 2 ) with concentrations greater than 20 (micro)g/L. Concentrations range from 60,000 (micro)g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 (micro)g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 (micro)g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

  17. 8 December 1953 - 8 December 1963. Atomic co-operation in the United Nations

    International Nuclear Information System (INIS)

    1964-01-01

    Full text: Ten years ago, on 8 December 1953, President Eisenhower proposed to the General Assembly of the United Nations measures to build 'a new avenue to peace'. This was the beginning of the idea that international understanding can be fostered through peaceful atomic co-operation in an international organization. Re-reading the President's statement ten years later, one is impressed by the continued urgency of his message. What he said in fact was that the nations of the world were living in the shadow of an overwhelming atomic threat and that steps were necessary, even though modest and untried, to break the impasse between the East and the West in the very field which caused the most profound concern - atomic energy. The International Atomic Energy Agency became an institutional reality in 1957, when the first General Conference met with 56 members. It now has 83 members, and a further five nations will become members as soon as statutory formalities are completed. The activity on the part of the Agency during these six years has gradually expanded, although it has fallen short of earlier hopes in certain areas. Time and patience, however, have been required and 1963 foreshadows further progress. Ten years after the proposal of the idea, scientists and statesmen can look back and be gratified that a contribution has been made to international understanding. Scientists and statesmen can look ahead, hopefully, to a future of increasing activity in this special agency to develop co-operation and agreement in the field of atomic energy. (author)

  18. Remedial design work plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    The Remedial Design Work Plan (RDWP) for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee, has been prepared. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative, as stated in the Record of Decision (ROD) was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Thereafter, a public hearing was held to review the proposed plan. Comments were incorporated. The revised selected remedy, per the ROD is to excavate and dispose of floodplain soils contaminated above the remediation goal of 400 parts per million mercury. The approved ROD with this goal will be the basis for remedial design (RD). The RD work plan (RDWP) is composed of six chapters. An introductory chapter describes the purpose and scope of the RDWP, the selected remedy as identified by the ROD; the roles and responsibilities of the RD team members, and the site background information, including site history, contaminants of concern, and site characteristics. Chapter 2 contains the design objectives, RD approach, regulatory considerations during RD, and the design criteria with assumptions. Chapter 3 presents the RD planning process to prepare this RDWP, as well as secondary RD support plans. Chapter 4 describes the scope of the RD activities in more detail and identifies what will be included in the design package. Chapter 5 presents the schedule for performance of the RD activities, identifying key RD milestones. Specific documents used in the preparation of this document are referenced in Chapter 6

  19. Browns Ferry Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Units 1 and 2 were down for the first half of the year caused by the fire of March 1975. Net electrical power generated by Unit 1 this year was 1,301,183 MWH with the generator on line 2,175.25 hrs. Unit 2 generated 1,567,170 MWH with the generator on line 2,548.73 hrs. Unit 3 began full power operation on November 20th and generated 1,416,891 MWH with the generator on line 2,058.20 hrs. Information is presented concerning operations, fuel performance, surveillance testing, containment leak testing, changes, power generation, shutdown and forced reductions, coolant chemistry, occupational radiation exposures, and maintenance

  20. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    CERN Document Server

    Ferlin, G; Claudet, S; Pezzetti, M

    2015-01-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  1. 5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system

    Science.gov (United States)

    Ferlin, G.; Tavian, L.; Claudet, S.; Pezzetti, M.

    2015-12-01

    Since 2009, the Large Hadron Collider (LHC) is in operation at CERN. The LHC superconducting magnets distributed over eight sectors of 3.3-km long are cooled at 1.9 K in pressurized superfluid helium. The nominal operating temperature of 1.9 K is produced by eight 1.8-K refrigeration units based on centrifugal cold compressors (3 or 4 stages depending to the vendor) combined with warm volumetric screw compressors with sub-atmospheric suction. After about 5 years of continuous operation, we will present the results concerning the availability for the final user of these refrigeration units and the impact of the design choice on the recovery time after a system trip. We will also present the individual results for each rotating machinery in terms of failure origin and of Mean Time between Failure (MTBF), as well as the consolidations and upgrades applied to these refrigeration units.

  2. 200-UP-1 Operable Unit borehole summary report for FY 1995

    International Nuclear Information System (INIS)

    Darrach, M.E.

    1996-07-01

    This report details the well construction, sampling, analyses, and geologic character of the Ringold Formation as it was encountered in five wells drilled in the 200-UP-1 Operable Unit during fiscal year (FY) 1995. The 200-UP-1 Interim Remedial Measure Drilling Description of Work was prepared to support the FY 95 field work and presented the specific field activities and procedural requirements to be implemented. The geology of the vadose zone is not described in the text of this report. Vadose zone geology in the immediate area is characterized in sufficient detail in existing documents. However, the borehole logs and well summary sheets provided in the appendices depict the vadose zone stratigraphy and well construction details. Sieve analyses conducted on sediments from the saturated zone were used to design the well completions; these analyses are included. Where applicable, inferences are made concerning the geologic character of the saturated interval. In addition, a synopsis of the preliminary well development process is outlined. Other related information is included with this report as supplemental data

  3. Stability of operational taxonomic units: an important but neglected property for analyzing microbial diversity.

    Science.gov (United States)

    He, Yan; Caporaso, J Gregory; Jiang, Xiao-Tao; Sheng, Hua-Fang; Huse, Susan M; Rideout, Jai Ram; Edgar, Robert C; Kopylova, Evguenia; Walters, William A; Knight, Rob; Zhou, Hong-Wei

    2015-01-01

    The operational taxonomic unit (OTU) is widely used in microbial ecology. Reproducibility in microbial ecology research depends on the reliability of OTU-based 16S ribosomal subunit RNA (rRNA) analyses. Here, we report that many hierarchical and greedy clustering methods produce unstable OTUs, with membership that depends on the number of sequences clustered. If OTUs are regenerated with additional sequences or samples, sequences originally assigned to a given OTU can be split into different OTUs. Alternatively, sequences assigned to different OTUs can be merged into a single OTU. This OTU instability affects alpha-diversity analyses such as rarefaction curves, beta-diversity analyses such as distance-based ordination (for example, Principal Coordinate Analysis (PCoA)), and the identification of differentially represented OTUs. Our results show that the proportion of unstable OTUs varies for different clustering methods. We found that the closed-reference method is the only one that produces completely stable OTUs, with the caveat that sequences that do not match a pre-existing reference sequence collection are discarded. As a compromise to the factors listed above, we propose using an open-reference method to enhance OTU stability. This type of method clusters sequences against a database and includes unmatched sequences by clustering them via a relatively stable de novo clustering method. OTU stability is an important consideration when analyzing microbial diversity and is a feature that should be taken into account during the development of novel OTU clustering methods.

  4. Health risks associated with ingesting venison from a uranium enrichment facility with multiple operable units

    International Nuclear Information System (INIS)

    Duncan, J.; Welsh, C.

    1995-01-01

    Ingestion of game, including venison, may be a significant exposure pathway in human health risk assessments at hazardous waste sites. The difficulty associated with modeling contaminant tissue concentrations in a wide-ranging herbivorous mammal is compounded when the home range of the mammal extends over multiple operable units (OUs) of varying size and media contaminant concentration. Using biotransfer factors extracted from the literature and species-specific parameter information (e.g., home range size, diet, forage and water ingestion rates) the authors estimate contaminant concentrations in venison based on soil and surface water contaminant concentrations and determine the contribution of individual OUs to modeled venison tissue concentrations. Estimated tissue concentrations are calculated through the use of site foraging factors (SFFS) that adjust exposure contributions from individual OUs to account for the size of the OU in relation to the animals home range. The authors then use the venison tissue concentrations to estimate human health risk associated with ingesting venison under both a current and future exposure scenario

  5. Qualitative research within trials: developing a standard operating procedure for a clinical trials unit

    Science.gov (United States)

    2013-01-01

    Background Qualitative research methods are increasingly used within clinical trials to address broader research questions than can be addressed by quantitative methods alone. These methods enable health professionals, service users, and other stakeholders to contribute their views and experiences to evaluation of healthcare treatments, interventions, or policies, and influence the design of trials. Qualitative data often contribute information that is better able to reform policy or influence design. Methods Health services researchers, including trialists, clinicians, and qualitative researchers, worked collaboratively to develop a comprehensive portfolio of standard operating procedures (SOPs) for the West Wales Organisation for Rigorous Trials in Health (WWORTH), a clinical trials unit (CTU) at Swansea University, which has recently achieved registration with the UK Clinical Research Collaboration (UKCRC). Although the UKCRC requires a total of 25 SOPs from registered CTUs, WWORTH chose to add an additional qualitative-methods SOP (QM-SOP). Results The qualitative methods SOP (QM-SOP) defines good practice in designing and implementing qualitative components of trials, while allowing flexibility of approach and method. Its basic principles are that: qualitative researchers should be contributors from the start of trials with qualitative potential; the qualitative component should have clear aims; and the main study publication should report on the qualitative component. Conclusions We recommend that CTUs consider developing a QM-SOP to enhance the conduct of quantitative trials by adding qualitative data and analysis. We judge that this improves the value of quantitative trials, and contributes to the future development of multi-method trials. PMID:23433341

  6. PROGRAM EVALUATION INVOLVEMENT INDONESIAN NATIONAL ARMED FORCES (TNI ON MISSION UNITED NATIONS PEACEKEEPING OPERATIONS (UNPKO

    Directory of Open Access Journals (Sweden)

    I Gede Sumertha KY

    2017-07-01

    Full Text Available This research is constructed in order to study and to evaluate involvement TNI on mission United Nations Peacekeeping Operations (UNPKO in Lebanon program FY 2014-2015 due to achieve vision 4000 Peacekeepers. The CIPP model is using on apply the qualitative method for the research with consist of four evaluation components: (1 context; (2 input; (3 process; (4 product. The mechanism collecting data were collected through interviews, observations, questionnaires and documentation study. There are three levels of evaluation for judgment each aspect: low, moderate, and high. The summarized results and figured into case-order effect matrix was figure out of the categorization.The results of this research indicate that TNI involvement in mission UNPKO Lebanon, aspire to increase the number of peacekeepers up to 4.000 personnel in the category “high”, but still have some minor additional improvement especially on coordination among stakeholders. This is because the Results of Context Evaluation has a category of "high" with a scale of assessment "many" (75.3%; the Results of Input Evaluation has a category of "high" with a scale of assessment "moderate" (60.6%; the Results of Process Evaluation has a category of "high" with a scale of assessment "moderate" (65.3% and the Results of Product Evaluation has a category of "high" with a scale of assessment "moderate" (63.3% .

  7. Niche differentiation in nitrogen metabolism among methanotrophs within an operational taxonomic unit.

    Science.gov (United States)

    Hoefman, Sven; van der Ha, David; Boon, Nico; Vandamme, Peter; De Vos, Paul; Heylen, Kim

    2014-04-04

    The currently accepted thesis on nitrogenous fertilizer additions on methane oxidation activity assumes niche partitioning among methanotrophic species, with activity responses to changes in nitrogen content being dependent on the in situ methanotrophic community structure Unfortunately, widely applied tools for microbial community assessment only have a limited phylogenetic resolution mostly restricted to genus level diversity, and not to species level as often mistakenly assumed. As a consequence, intragenus or intraspecies metabolic versatility in nitrogen metabolism was never evaluated nor considered among methanotrophic bacteria as a source of differential responses of methane oxidation to nitrogen amendments. We demonstrated that fourteen genotypically different Methylomonas strains, thus distinct below the level at which most techniques assign operational taxonomic units (OTU), show a versatile physiology in their nitrogen metabolism. Differential responses, even among strains with identical 16S rRNA or pmoA gene sequences, were observed for production of nitrite and nitrous oxide from nitrate or ammonium, nitrogen fixation and tolerance to high levels of ammonium, nitrate, and hydroxylamine. Overall, reduction of nitrate to nitrite, nitrogen fixation, higher tolerance to ammonium than nitrate and tolerance and assimilation of nitrite were general features. Differential responses among closely related methanotrophic strains to overcome inhibition and toxicity from high nitrogen loads and assimilation of various nitrogen sources yield competitive fitness advantages to individual methane-oxidizing bacteria. Our observations proved that community structure at the deepest phylogenetic resolution potentially influences in situ functioning.

  8. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2

    International Nuclear Information System (INIS)

    1995-09-01

    This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985). Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992). Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993). Supplement No. 13 (April 1994), Supplement No. 14 (December 1994), and Supplement No. 15 (June 1995) issued by the Office of Nuclear Reactor Regulation of the U.S. Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos, 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER

  9. Limited field investigation report for the 100-NR-1 operable unit. Draft A

    International Nuclear Information System (INIS)

    1994-08-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-NR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land-use scenarios. An LFI report is required when waste sites are to be considered for IRM and existing data are insufficient to formulate a conceptual model or perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify potential contaminant and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose a risk to human health or the environment that warrants action through IRM. Seven sites were intrusively investigated: 1322-N, 116-N-2, 119-N, 120-N-2, 120-N-1, South Settling Pond, and the 166-N Tank Farm (UN-100-N-17) unplanned release at the 166-N Tank Farm. Vadose zone sediments from these sites were sampled and analyzed. Radiological contamination is the primary concern as confirmed through this study

  10. Limited field investigation report for the 100-FR-1 Operable Unit

    International Nuclear Information System (INIS)

    1995-09-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-FR-1 Source Operable Unit LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. An LFI is required when existing data are insufficient to formulate a conceptual model and perform a QRA. The purpose of the report is to identify those sites that are recommended to remain as candidates for IRM, provide a preliminary summary of site characterization studies, refine the conceptual model as needed, identify contaminant- and location-specific applicable or relevant and appropriate requirements (ARAR), and provide a qualitative assessment of the risks associated with the sites. This assessment includes consideration of whether contaminant concentrations pose an unacceptable risk that warrants action through IRM. The final decision to conduct an IRM will rely on many factors including risk, ARAR, future land use, point of compliance, time of compliance, a bias-for-action, and the threat to human health and the environment

  11. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    Energy Technology Data Exchange (ETDEWEB)

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  12. First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit

    CERN Document Server

    Antoine, A; Magnin, N; Juteau, P; Voumard, N

    2011-01-01

    Two LHC Beam Dumping Systems (LBDS) remove the counter-rotating beams safely from the collider during setting up of the accelerator, at the end of a physics run and in case of emergencies. Dump requests can come from 3 different sources: the machine protection system in emergency cases, the machine timing system for scheduled dumps or the LBDS itself in case of internal failures. These dump requests are synchronized with the 3 μs beam abort gap in a fail-safe redundant Trigger Synchronization Unit (TSU) based on a Digital Phase Locked Loop (DPLL), locked onto the LHC beam revolution frequency with a maximum phase error of 40 ns. The synchronized trigger pulses coming out of the TSU are then distributed to the high voltage generators of the beam dump kickers through a redundant fault-tolerant trigger distribution system. This paper describes the operational experience gained with the TSU since its commissioning with beam in 2009, and highlights the improvements, which have been implemented f...

  13. Technological developments in real-time operational hydrologic forecasting in the United States

    Science.gov (United States)

    Hudlow, Michael D.

    1988-09-01

    The hydrologic forecasting service of the United States spans applications and scales ranging from those associated with the issuance of flood and flash warnings to those pertaining to seasonal water supply forecasts. New technological developments (underway in or planned by the National Weather Service (NWS) in support of the Hydrologic Program) are carried out as combined efforts by NWS headquarters and field personnel in cooperation with other organizations. These developments fall into two categories: hardware and software systems technology, and hydrometeorological analysis and prediction technology. Research, development, and operational implementation in progress in both of these areas are discussed. Cornerstones of an overall NWS modernization effort include implementation of state-of-the-art data acquisition systems (including the Next Generation Weather Radar) and communications and computer processing systems. The NWS Hydrologic Service will capitalize on these systems and will incorporate results from specific hydrologic projects including collection and processing of multivariate data sets, conceptual hydrologic modeling systems, integrated hydrologic modeling systems with meteorological interfaces and automatic updating of model states, and extended streamflow prediction techniques. The salient aspects of ongoing work in these areas are highlighted in this paper, providing some perspective on the future U.S. hydrologic forecasting service and its transitional period into the 1990s.

  14. Data validation report for the 100-FR-3 Operable Unit, third round groundwater samples

    International Nuclear Information System (INIS)

    Ayres, J.M.

    1994-01-01

    Westinghouse-Hanford has requested that a minimum of 20% of the total number of Sample Delivery Groups be validated for the 100-FR-3 operable Unit Third Round Groundwater sampling investigation. Therefore, the data from the chemical analysis of 51 samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported sample results were of sufficient quality to support decisions regarding remedial actions performed at this site. The report is broken down into sections for each chemical analysis and radiochemical analysis type. Each section addresses the data package completeness, holding time adherence, instrument calibration and tuning acceptability, blank results, accuracy, precision, system performance, as well as the compound identification and quantitation. In addition, each section has an overall assessment and summary for the data packages reviewed for the particular chemical/radiochemical analyses. Detailed backup information is provided to the reader by SDG No. and sample number. For each data package, a matrix of chemical analyses per sample number is presented, as well as data qualification summaries

  15. Identification of Promising Remediation Technologies for Iodine in the UP-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Strickland, Christopher E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lee, Brady D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Qafoku, Nikolla [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Szecsody, James E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Vermeul, Vincent R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-09-01

    Iodine-129 (129I) generated at the U.S. Department of Energy (DOE) Hanford Site during plutonium production was released to the subsurface, resulting in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1 operable unit (OU). Because 129I is an uncommon contaminant, relevant remediation experience and scientific literature are limited, though work is under way to better understand the fate and transport of 129I in the environment and the effectiveness of potential remediation technologies. The recent UP-1 Evaluation Plan for Iodine and report on the Conceptual Model of Iodine Behavior in the Subsurface at the Hanford Site provide information on the history of contamination in the 200-UP-1 OU, relevant controlling processes (biological and geochemical), risk, the conceptual site model, and potential remedial options, which provided a foundation for this study. In this study, available information was compiled and used to categorize potential remediation technologies, culminating in a recommendation of promising technologies for further evaluation. Approaches to improve the technical information about promising technologies are also recommended in this study so that a subsequent evaluation of potential remediation alternatives can assess these technologies.

  16. Schizoaffective Disorder in an acute psychiatric unit: Profile of users and agreement with Operational Criteria (OPCRIT

    Directory of Open Access Journals (Sweden)

    Ryola Singh

    2016-05-01

    Full Text Available Background: Schizoaffective Disorder is a controversial and poorly understood diagnosis. Experts disagree on whether it is a discrete disorder; whether it is on a spectrum between Bipolar Disorder and Schizophrenia or whether it even exists. Lack of individual research attention given to this disorder, changing diagnostic criteria and hence poor diagnostic stability have all contributed to the dearth of knowledge surrounding Schizoaffective Disorder. Objectives: To describe the profile of mental health care users (MHCUs diagnosed with Schizoaffective Disorder and determine the degree of agreement between the clinicians’ diagnosis and Operational Criteria (OPCRIT. Method: All MHCUs at Helen Joseph Hospital psychiatric unit with Schizoaffective Disorder between 01 January 2004 and 31 December 2010 were included. The demographic, clinical and treatment profiles as well as data required for OPCRIT were extracted from hospital records and discharge summaries. Results: Most MHCUs with Schizoaffective Disorder were female (68.89%, with a mean age of illness onset of 25 years (SD ± 7.11, had a family history of mood disorders (76.92% and displayed impaired functioning. Majority (80% were treated with at least one antipsychotic and one mood stabiliser. No agreement was found between the clinicians’ diagnosis and OPCRIT. Conclusion: While the profile of MHCUs with Schizoaffective Disorder in this study is similar to other studies, the lack of agreement between the clinicians’ and OPCRIT diagnoses calls for further research using larger population samples and a dimensional approach to diagnoses in order to improve understanding and management of Schizoaffective Disorder.

  17. Final Environmental Statement related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-09-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with Beaver Valley Power Station Unit 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs, and concludes that the action called for is the issuance of an operating license for Beaver Valley Unit 2

  18. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  19. Micro-cogeneration units based on Stirling engine for heating and their real operation

    Science.gov (United States)

    Čierny, Jaroslav; Patsch, Marek

    2014-08-01

    This article was deal with micro-cogeneration units based on Stirling engine. We watched problematic of real working Stirling engine. The article also contain hookup of unit constructed at University of Zilina.

  20. Surry Power Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electric power generated by Unit 1 was 2,315,124 MWH(e) and Unit 2 generated 2,062,954 MWH(e) with Unit 1 generator on line for 3,157.8 hrs and Unit 2 on line for 2,881.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  1. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  2. Symptoms of Psychological Distress and Post-Traumatic Stress Disorder in United States Air Force Drone Operators

    Science.gov (United States)

    2014-08-01

    Disorder in United States Air Force “ Drone ” Operators 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S...referred to as “ drones .” Participants were assessed for self-reported sources of occupational stress, levels of clinical distress using the Outcome...providers are discussed. 15. SUBJECT TERMS Stress, drone operator, PTSD, USAF 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT

  3. Analysis of the Capabilities Supporting Humanitarian Assistance and Disaster Relief Operations of the Indonesian Navy (TNI AL) and the United States Marine Corps Marine Expeditionary Unit (USMC MEU)

    Science.gov (United States)

    2015-12-01

    Operating Procedure SPMAGTF Special Purpose Marine Air Ground Task Force SSB Single Side Band STP Shock Trauma Platoon TACRON Tactical Air Control...Platoon ( STP ) that is capable of conducting emergency treatment and triage. The remaining corpsmen are dispersed throughout the individual sub-units of...Jane’s navigating the emerging markets , Indonesia. Retrieved from Jane’s Information Group https://janes.ihs.com.libproxy.nps.edu/CustomPages/Janes

  4. Phase 1 and 2 feasibility study report for the 300-FF-1 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The 300-FF-1 Operable Unit (OU) feasibility study (FS) presented in this document completes the FS process only through the first two study phases: Phase I, Remedial Alternatives Development, and Phase II, Remedial Alternatives Screening in accordance with CERCIA guidance for performing Remedial Investigations and Feasibility Studies (RI/FS) (EPA 1988a). This Phase I/II study provides a generalized view of workable remedial technologies as applied to the site contamination problems as a whole. Phase III, Detailed Analysis of Alternatives, will be performed at a later date to further evaluate screened alternatives based on the nine criteria in the CERCLA RI/FS guidance. The purpose of this Phase I/II FS is to develop and screen a range of alternatives for remediation of contamination present in the vadose zone of the 300-FF-1 OU. The scope of work for this Phase I/II FS includes five primary tasks: 1. Review existing documents and their associated data from relevant investigations and studies; 2. Establish remedial action objectives (RAO) and general response actions (GRA); 3. Identify applicable or relevant and appropriate requirements (ARARS) pertinent to all general response actions (including waste disposal); 4. Develop remedial alternatives (Phase I) applicable to the 300-FF-1 OU including identification and screening of technologies and process options, and assembly of remedial alternatives from representative technology types; 5. Screen alternatives (Phase II) developed in Phase I for implementability, effectiveness, and cost to identify those alternatives which warrant advancement to the detailed analysis phase (Phase III) of the FS.

  5. 78 FR 37584 - U.S. Steel Tubular Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United...

    Science.gov (United States)

    2013-06-21

    ... make the following certification: All workers of U.S. Steel Tubular Products, McKeesport Tubular... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, Pennsylvania; Notice of Amended Certification Pursuant to Section 221 of the Trade Act of 1974...

  6. Teaching Mass Transfer and Filtration Using Crossflow Reverse Osmosis and Nanofiltration: An Experiment for the Undergraduate Unit Operations Lab

    Science.gov (United States)

    Anastasio, Daniel; McCutcheon, Jeffrey

    2012-01-01

    A crossflow reverse osmosis (RO) system was built for a senior-level chemical engineering unit operations laboratory course. Intended to teach students mass transfer fundamentals related to membrane separations, students tested several commercial desalination membranes, measuring water flux and salt rejections at various pressures, flow rates, and…

  7. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Science.gov (United States)

    2011-01-04

    ... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance... Web site http://www.regulations.gov . Because your comments will not be edited to remove any... will not edit their comments to remove any identifying or contact information, and therefore, they...

  8. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Science.gov (United States)

    2011-05-24

    ... Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice of Consideration of Issuance..., http://www.regulations.gov . Because your comments will not be edited to remove any identifying or... received from other persons for submission to the NRC inform those persons that the NRC will not edit their...

  9. 46 CFR 153.903 - Operating a United States ship in special areas: Categories A, B, and C.

    Science.gov (United States)

    2010-10-01

    ... NLS residue in a special area unless— (a) The ship's Certificate of Inspection is endorsed in... 46 Shipping 5 2010-10-01 2010-10-01 false Operating a United States ship in special areas... (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS...

  10. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  11. Safety evaluation report related to the operation of Shoreham Nuclear Power Station, Unit No. 1. Docket No. 50-322

    International Nuclear Information System (INIS)

    1983-02-01

    Supplement No. 3 to the Safety Evaluation Report of Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have come to light since the previous supplement was issued

  12. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  13. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  14. 40 CFR 73.18 - Submittal procedures for units commencing commercial operation during the period from January 1...

    Science.gov (United States)

    2010-07-01

    ... commencing commercial operation during the period from January 1, 1993, through December 31, 1995. 73.18 Section 73.18 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Allocations § 73.18 Submittal procedures for units...

  15. Unit operation in food manufacturing and processing. Shokuhin seizo/kako ni okeru tan'i sosa

    Energy Technology Data Exchange (ETDEWEB)

    Matsuno, R. (Kyoto Univ., Kyoto (Japan). Faculty of Aguriculture)

    1993-09-05

    Processed foods must be produced in mass, cheap and safe and should be suitable for the delicate taste of human being. Food tastes are effected by an outlook on human attitude, and the surrounding environment. And these factors are reflected to unit operation in food manufacturing and processing and it is clarified that there are many technical difficulties. The characteristics of unit operation for food manufacturing and processing are that the food materials are a multicomponent system, moreover, a very small amount of aroma components, taste components, vitamin, physiologically activation materials and so on are more important than the main components, and also inapplicable of the model centering to the most quantitative component. The purpose of unit operation in food manufacturing and processing is to produce the properties of matter matching to human sense, and therefore there are many problems left unsolved. The development of analytical technology also has an influence on manufacturing and processing technology. Consequently, food manufacturing and processing technology must be based on general science. It is necessary to develop unit operation with an understanding of mutual effect between food and human body.

  16. Proposed Plan for Interim Remedial Actions at the 100-NR-1 Source Sites Operable Unit and the 100-NR-2 Groundwater Operable Unit

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1998-02-01

    This Proposed Plan summary includes brief descriptions of the key issues for the 100-N Area contaminated soil and groundwater. This summary is intended as a simplified introduction to readers who might not be familiar with the contaminated site cleanup process or Hanford Site issues. The detailed Proposed Plan is attached to this summary. Some of the buildings and surrounding soils in the 100 Area of the Hanford Site were contaminated during operation of the nuclear reactors. The contamination poses a potential threat to public health and/or the environment. The potential threat to the public is exposure to people on or near the site to radiation and chemicals. The potential threat to the environment is contamination in the soil that has migrated to the groundwater and could eventually harm the Columbia River. Because of these potential threats, the Federal Government decided that the 100 Area was a high priority for cleanup and placed it on the National Priorities List

  17. Study of accelerated unit unloading mode initiated by turbine feed pump trip with TVSA fuel assemblies operation in WWER-1000

    International Nuclear Information System (INIS)

    Borysenko, V.I.; Kadenko, I.N.; Samoilenko, D.V.

    2012-01-01

    This paper provides the study results of accelerated unit unloading mode (AUU) initiated at WWER-1000 unit operated at 100 % power and its expediency in the event of single Turbo Feed Pump (TFP) failure. Modeling was performed using an advanced calculation code RELAP/SCDAPSIM/Mod3.4 and relevant model for KhNPP Unit No. 2. As the study shows, SCRAM cannot be prevented in case of failure of 3 main circulation pumps due to steam generators (SG) level drop. Based on the results obtained, it is reasonably justified to allow SCRAM signal instead of AUU activation in case of single TFP failure at power level more than 90 % of N n om. This will provide more sparing temperature modes for fuel assemblies and equipment, as well as prevent additional thermal cycling loads and violation of safe operation limits as SG water levels

  18. Global Strategy Implementation at the Business Unit Level: Operational Capabilities and Administrative Mechanisms

    OpenAIRE

    Kendall Roth; David M Schweiger; Allen J Morrison

    1991-01-01

    The study examines the impact of internationally strategy on organizational design and the influence of the organizational design on effectiveness at the business unit level. The empirical findings are based on survey responses from eighty-two business units competing in global industries. The findings are supportive of the contingency notion which suggests that business unit effectiveness is a function of the fit between the international strategy and the organizational design.© 1991 JIBS. J...

  19. The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

    Science.gov (United States)

    Fatig, Curtis; Ochs, William; Johns, Alan; Seaton, Bonita; Adams, Cynthia; Wasiak, Francis; Jones, Ronald; Jackson, Wallace

    2012-01-01

    The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

  20. Changing priorities of codes and standards: An A/E's perspective for operating units and new generation

    International Nuclear Information System (INIS)

    Meyers, B.L.; Jackson, R.W.; Morowski, B.D.

    1994-01-01

    As the nuclear power industry has shifted emphasis from the construction of new plants to the reliability and maintenance of operating units, the industry's commitment to safety has been well guarded and maintained. Many other important indicators of nuclear industry performance are also positive. Unfortunately, by some projections, as many as 25 operating nuclear units could prematurely shutdown because of increasing O ampersand M and total operating costs. The immediate impact of higher generating costs on the nuclear industry is evident. However, when viewed over the longer-term, high generating costs will also affect license renewals, progress in the development of advanced light water reactor designs and prospects for a return to the building of new plants. Today's challenge is to leverage the expertise and contribution of the nuclear industry partner organizations to steadily improve the work processes and methods necessary to reduce operating costs, to achieve higher levels in the performance of operating units, and to maintain high standards of technical excellence and safety. From the experience and perspective of an A/E and partner in the nuclear industry, this paper will discuss the changing priorities of codes and standards as they relate to opportunities for the communication of lessons learned and improving the responsiveness to industry needs

  1. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January--December 1977

    International Nuclear Information System (INIS)

    1978-01-01

    After a summary of reactor operating experiences, data are presented concerning amendments to the operating licenses and technical specifications, changes, modifications, tests, experiments, and maintenance of safety-related equipment

  2. The application of burnup credit for spent fuel operations in the United Kingdom

    International Nuclear Information System (INIS)

    Bowden, R.

    1998-01-01

    This paper begins by outlining the structure of the nuclear industry in the United Kingdom. It then sets out the methodology of burnup credit, and provides a brief discussion of the validation and robustness of the calculational route. This leads to a description of both the current and intended applications of burnup credit in the United Kingdom. (author)

  3. Quad-Cities Station, Units 1 and 2. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated by Unit 1 was 3,393,062 MWH with the generator on line 5,703.0 hrs. Unit 2 generated 4,304,684 MWH with the generator on line 7,145.3 hrs. Information is presented concerning modifications, maintenance, power generation, shutdowns, occupational radiation exposures, and organization

  4. Record of Decision for Tank Farm Soil and INTEC Groundwater, Operable Unit 3-14

    Energy Technology Data Exchange (ETDEWEB)

    L. S. Cahn

    2007-05-16

    This decision document presents the selected remedy for Operable Unit (OU) 3-14 tank farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center (INTEC), which is located on the Idaho National Laboratory (INL) Site. The tank farm was initially evaluated in the OU 3-13 Record of Decision (ROD), and it was determined that additional information was needed to make a final decision. Additional information has been obtained on the nature and extent of contamination in the tank farm and on the impact to groundwater. The selected remedy was chosen in accordance with the Comprehensive Environmental Response, Liability and Compensation Act of 1980 (CERCLA) (42 USC 9601 et seq.), as amended by the Superfund Amendments and Reauthorization Act of 1986 (Public Law 99-499) and the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR 300). The selected remedy is intended to be the final action for tank farm soil and groundwater at INTEC. The response action selected in this ROD is necessary to protect the public health, welfare, or the environment from actual or threatened releases of hazardous substances into the environment. Such a release or threat of release may present an imminent and substantial endangerment to public health, welfare, or the environment. The remedial actions selected in this ROD are designed to reduce the potential threats to human health and the environment to acceptable levels. In addition, DOE-ID, EPA, and DEQ (the Agencies) have determined that no action is necessary under CERCLA to protect public health, welfare, or the environment at 16 sites located outside the tank farm boundary. The purposes of the selected remedy are to (1) contain contaminated soil as the radionuclides decay in place, (2) isolate current and future workers and biological receptors from contact with contaminated soil, and (3) restore the portion of Snake River Plain Aquifer contaminated by INTEC releases to Idaho Ground Water Quality

  5. BIOTIC INTEGRITY OF STREAMS IN THE SAVANNAH RIVER SITE INTEGRATOR OPERABLE UNITS, 1996 TO 2003

    Energy Technology Data Exchange (ETDEWEB)

    Paller, M; Susan Dyer, S

    2004-11-08

    The Savannah River Site (SRS) has been divided into six Integrator Operable Units (IOUs) that correspond to the watersheds of the five major streams on the SRS (Upper Three Runs, Fourmile Branch, Pen Branch, Steel Creek, and Lower Three Runs) and the portions of the Savannah River and Savannah River Swamp associated with the SRS. The streams are the primary integrators within each IOU because they potentially receive, through surface or subsurface drainage, soluble contaminants from all waste sites within their watersheds. If these contaminants reach biologically significant levels, they would be expected to effect the numbers, types, and health of stream organisms. In this study, biological sampling was conducted within each IOU as a measure of the cumulative ecological effects of the waste sites within the IOUs. The use of information from biological sampling to assess environmental quality is often termed bioassessment. The IOU bioassessment program included 38 sites in SRS streams and nine sites in the Savannah River. Sampling was conducted in 1996 to 1998, 2000, and 2003. Four bioassessment methods were used to evaluate ecological conditions in the IOU streams: the Index of Biotic Integrity, the Fish Health Assessment Index, measurement of fish tissue contaminant levels, and two benthic macroinvertebrate indices. The Index of Biotic Integrity (IBI) is an EPA supported method based on comparison of ecologically important and sensitive fish assemblage variables between potentially disturbed and reference (i.e., undisturbed) sites. It is designed to assess the ability of a stream to support a self-sustaining biological community and ecological processes typical of undisturbed, natural conditions. Since many types of contaminants can bioaccumulate, fish tissue contaminant data were used to determine the types of chemicals fish were exposed to and their relative magnitudes among IOUs. The Fish Health Assessment Index (HAI) is an EPA supported method for assessing

  6. Nursing Leaders' Satisfaction with Information Systems in the Day-to-Day Operations Management in Hospital Units.

    Science.gov (United States)

    Peltonen, Laura-Maria; Junttila, Kristiina; Salanterä, Sanna

    2018-01-01

    Information usage in the day-to-day operations management of hospital units is complex due to numerous information systems in use. The aim of this study was to describe and compare nurse leaders' satisfaction with information systems used in the day-to-day operations management in hospital units. The design was a cross-sectional survey with five questions rated from one (disagree) to five (fully agree). The response rate was 65 % (n = 453). Respondents reported fair satisfaction with how information systems support decision-making (median 4, IQR 3-4) and improve ease of access to information (median 4, IQR 3-4). However, respondents were less satisfied with how systems improve speed of access to information (median 3, IQR 3-4). Nor did respondents think that systems were developed for them (median 3, IQR 2-4). Respondents further reported needing numerous systems daily to support decision-making (median 4, IQR 3-5). A clear need for one system, which would gather important information for display was stated (median 5, IQR 4-5). Work experience, gender and time when overseeing the unit were associated with some aspects related to satisfaction. In conclusion, information system improvements are needed to better support the day-to-day operations management in hospital units.

  7. Corrective economic dispatch and operational cycles for probabilistic unit commitment with demand response and high wind power

    International Nuclear Information System (INIS)

    Azizipanah-Abarghooee, Rasoul; Golestaneh, Faranak; Gooi, Hoay Beng; Lin, Jeremy; Bavafa, Farhad; Terzija, Vladimir

    2016-01-01

    Highlights: • Suggesting a new UC mixing a probabilistic security and incentive demand response. • Investigating the effects of uncertainty on UC using chance-constraint programming. • Proposing an efficient spinning reserve satisfaction based on a new ED correction. • Presenting a new operational cycles way to convert binary variable to discrete one. - Abstract: We propose a probabilistic unit commitment problem with incentive-based demand response and high level of wind power. Our novel formulation provides an optimal allocation of up/down spinning reserve. A more efficient unit commitment algorithm based on operational cycles is developed. A multi-period elastic residual demand economic model based on the self- and cross-price elasticities and customers’ benefit function is used. In the proposed scheme, the probability of residual demand falling within the up/down spinning reserve imposed by n − 1 security criterion is considered as a stochastic constraint. A chance-constrained method, with a new iterative economic dispatch correction, wind power curtailment, and commitment of cheaper units, is applied to guarantee that the probability of loss of load is lower than a pre-defined risk level. The developed architecture builds upon an improved Jaya algorithm to generate feasible, robust and optimal solutions corresponding to the operational cost. The proposed framework is applied to a small test system with 10 units and also to the IEEE 118-bus system to illustrate its advantages in efficient scheduling of generation in the power systems.

  8. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units

    International Nuclear Information System (INIS)

    Clausner, J.P.; Jorel, M.

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units

  9. Data compilation task report for the source investigation of the 300-FF-1 operable unit phase 1 remedial investigation

    International Nuclear Information System (INIS)

    Young, J.S.; Fruland, R.M.; Fruchter, J.S.

    1990-02-01

    This report provides additional information on facility and waste characteristics for the 300-FF-1 operable unit. The additional information gathered and reported includes meetings and on-site visits with current and past personnel having knowledge of operations in the operable unit, a more precise determination of the location of the Process Sewer lines and Retired Radioactive Liquid Waste Sewer, a better understanding of the phosphoric acid spill at the 340 Complex, and a search for engineering plans and environmental reports related to the operable unit. As a result of this data-gathering effort, recommendations for further investigation include characterization of the 307 Trenches to determine the origin of an underlying uranium plume in the groundwater, more extensive sampling of near-surface and dike sediments in the North and South Process Ponds to better define the extent of horizontal contamination, and detection of possible leaks in the abandoned Radioactive Waste Sewer by either electromagnetic induction or remote television camera inspection techniques. 16 refs., 4 figs., 5 tabs

  10. Does the Future Engineer Force Transition Engineer Units between Offensive and Stability Operations in Ways That Achieve Responsiveness, Versatility, Agility, Effectiveness, and Efficiency?

    National Research Council Canada - National Science Library

    London, David T

    2005-01-01

    .... The main question is as follows: Does the FEF transition engineer units between offensive and stability operations in ways that achieve responsiveness, versatility, agility, effectiveness, and efficiency...

  11. United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition

    International Nuclear Information System (INIS)

    1998-03-01

    The Environment, Safety and Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada

  12. United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The Environment, Safety & Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada.

  13. China and the United Nations Convention on the Law of the Sea: Operational Challenges

    National Research Council Canada - National Science Library

    Vincent, Steven D

    2005-01-01

    ...), and has made maritime claims citing historic waters. China asserts that these actions are consistent with the provisions of the United Nations Convention On The Law Of the Sea (UNCLOS) Treaty...

  14. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 6, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electrical power generated by Unit 3 was 2,676,523 MWH(e) with the plant on line 4,148.8 hrs. Unit 4 generated 1,429,108 MWH(e) and was on line 2,232.0 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental radiation monitoring. (FS)

  15. No Correlation Between Work-Hours and Operative Volumes--A Comparison Between United States and Danish Operative Volumes Achieved During Surgical Residency.

    Science.gov (United States)

    Kjærgaard, Jane; Sillesen, Martin; Beier-Holgersen, Randi

    2016-01-01

    Since 2003, United States residents have been limited to an 80-hour workweek. This has prompted concerns of reduced educational quality, especially inadequate operating exposure. In contrast, the Danish surgical specialty-training program mandates a cap on working hours of 37 per week. We hypothesize that there is no direct correlation between work-hours and operative volume achieved during surgical residency. To test the hypothesis, we compare Danish and US operative volumes achieved during surgical residency training. Retrospective comparative study. The data from the US population was extracted from the Accreditation Council for Graduate Medical Education database for General Surgery residents from 2012 to 2013. For Danish residents, a questionnaire with case categories matching the Accreditation Council for Graduate Medical Education categories were sent to all Danish surgeons graduating the national surgical residency program in 2012 or 2013, 54 in total. In all, 30 graduated residents (55%) responded to the Danish survey. We found no significant differences in mean total major procedures (1002.4 vs 976.9, p = 0.28) performed during residency training, but comparing average major procedures per year, the US residents achieve significantly more (132.3 vs 195.4, p work-hours and operative volumes achievable. Factors other than work-hours seem to effect on operative volumes achieved during training. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  16. Prevalence of Giardia duodenalis assemblages in weaned cattle on cow-calf operations in the United States.

    Science.gov (United States)

    Santin, Monica; Dargatz, David; Fayer, Ronald

    2012-02-10

    To determine the prevalence of Giardia duodenalis in weaned beef calves on cow-calf operations in the United States, fecal specimens were collected from 819 calves (6-18 months of age) from 49 operations. After cleaning and concentration procedures to maximize recovery of cysts from feces, DNA was extracted from each of the 819 specimens. The presence of G. duodenalis was determined by nested PCR of a fragment of the SSU rRNA gene. All positive PCR products were subjected to sequence analysis. The overall sample level prevalence of Giardia was 33.5% with prevalence ranging from 0 to 100% among operations. The highest within herd prevalence of infected beef calves was found in one cow-calf operation from the South region (100%), followed by a cow-calf operation from the West region (90%), and three cow-calf operations from the Midwest region (87.5, 85, and 85%). Giardia was not detected in samples from 7 operations including 5 cow-calf operations from the South region, and 1 cow-calf operation each from the Midwest and West regions. Molecular analysis of the Giardia-positive samples identified assemblage E (or E-like) in 31.7% of all samples (260/819) and assemblage A in 1.2% (10/819). A mixed infection with assemblages A and E was observed in four calves from an operation in Midwest region. The potentially zoonotic assemblage A was detected in specimens from four operations in Midwest region. These findings indicate that most G. duodenalis found in weaned beef calves was assemblage E which represents no known zoonotic threat. However, the presence of assemblage A in a small number of animals poses a potential risk of infection to humans. Published by Elsevier B.V.

  17. Trend analysis of nuclear reactor automatic trip events subjected to operator's human error at United States nuclear power plants

    International Nuclear Information System (INIS)

    Takagawa, Kenichi

    2009-01-01

    Trends in nuclear reactor automatic trip events due to human errors during plant operating mode have been analyzed by extracting 20 events which took place in the United States during the period of seven years from 2002 to 2008, cited in the LERs (Licensee Event Reports) submitted to the US Nuclear Regulatory Commission (NRC). It was shown that the yearly number of events was relatively large before 2005, and thereafter the number decreased. A period of stable operation, in which the yearly number was kept very small, continued for about three years, and then the yearly number turned to increase again. Before 2005, automatic trip events occurred more frequently during periodic inspections or start-up/shut-down operations. The recent trends, however, indicate that trip events became more frequent due to human errors during daily operations. Human errors were mostly caused by the self-conceit and carelessness of operators through the whole period. The before mentioned trends in the yearly number of events might be explained as follows. The decrease in the automatic trip events is attributed to sharing trouble information, leading as a consequence to improvement of the manual and training for the operations which have a higher potential risk of automatic trip. Then, while the period of stable operation continued, some operators came to pay less attention to preventing human errors and not interest in the training, leading to automatic trip events in reality due to miss-operation. From these analyses on trouble experiences in the US, we learnt the followings to prevent the occurrence similar troubles in Japan: Operators should be thoroughly skilled in basic actions to prevent human errors as persons concerned. And it should be further emphasized that they should elaborate by imaging actual plant operations even though the simulator training gives them successful experiences. (author)

  18. The Quality of Operative Notes at a General Surgery Unit | Rogers ...

    African Journals Online (AJOL)

    practice, accurate documentation is critical. This is particularly true for operative procedures, and medical councils have identified this and published guidelines to aid surgeons. However, these remain a frequently cited weakness in their defence in medico-legal cases. This study assessed the accuracy of operative notes in ...

  19. Toeplitz and Hankel operators and Dixmier trances on the unit ball of C-n

    Czech Academy of Sciences Publication Activity Database

    Engliš, Miroslav; Guo, K.; Zhang, G.

    2009-01-01

    Roč. 137, č. 11 (2009), s. 3669-3678 ISSN 0002-9939 R&D Projects: GA ČR(CZ) GA201/06/0128 Institutional research plan: CEZ:AV0Z10190503 Keywords : Schatten- von Neumann classes * Macaev classes * trace * Dixmier trace * Toeplitz operators * Hankel operators Subject RIV: BA - General Mathematics Impact factor: 0.640, year: 2009

  20. The Secret Air War Over France USAAF Special Operations Units in the French Campaign of 1944

    Science.gov (United States)

    1992-05-01

    Branch, or SI, and its Special Operations Branch, known as SO. The Secret Intelligence Branch was responsible for collecting foreign intelligence...infiltrating its own intelligence agents into France. The Secret Intelligence Branch staff in London (SI/London) began planning for joint operations

  1. Final environmental statement related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-12-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of Millstone Nuclear Power Station, Unit 3, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be small. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of an operating license for Millstone Nuclear Power Station, Unit 3. 101 references, 33 figures, 30 tables

  2. Treatment/Disposal Plan for Drummed Waste from the 300-FF-1 Operable Unit, 618-4 Burial Ground

    International Nuclear Information System (INIS)

    Lerch, J.A.

    1999-01-01

    The objective of this plan is to support selection of a safe, environmentally responsible, and cost-effective treatment and disposal method for drums containing depleted uranium metal chips submerged in oil that have been and will be excavated from the 618-4 Burial Ground. Remediation of the 300-FF-1 Operable Unit, 618-4 Burial Ground was initiated in fiscal year (FY) 1998 as an excavation and removal operation. Routine processes were established to excavate and ship contaminated soil and debris to the Environmental Restoration Disposal Facility (ERDF) for disposal

  3. Design and operational considerations of United States commercial nea-surface low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Birk, Sandra M.

    1997-01-01

    Low-level radioactive waste disposal standards and techniques in the United States have evolved significantly since the early 1960's. Six commercial LLW disposal facilities(Barnwell, Richland, Ward Valley, Sierra Blanca, Wake County and Boyd County) operated and proposed between 1962 and 1997. This report summarizes each site's design and operational considerations for near-surface disposal of low-level radioactive waste. These new standards and mitigating efforts at closed facilities (Sheffield, Maxey Flats, Beatty and West Valley) have helped to ensure that the public has been safely protected from LLW. 15 refs

  4. Safety evaluation report related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-07-01

    The Safety Evaluation Report for the application filed by Northeast Nuclear Energy Company, as applicant and agent for the owners, for a license to operate the Millstone Nuclear Power Station Unit 3 (Docket No. 50-423), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in the town of Waterford, New London County, Connecticut, on the north shore of Long Island Sound. Subject to favorable resolution of the items discussed in this report, the NRC staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  5. Safety Evaluation Report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-10-01

    This Safety Evaluation Report on the application filed by Duquesne Light Company, as applicant and agent for the owners, for a license to operate the Beaver Valley Power Station Unit 2 (Docket No. 50-412) has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in Shippingport Borough, Beaver County, Pennsylvania, on the south bank of the Ohio River. Subject to the favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  6. The Agency's technical co-operation programme with the United Arab Emirates 1984-1994 country programme summaries

    International Nuclear Information System (INIS)

    1994-01-01

    This report contains a review of the Agency's technical co-operation activities in the United Arab Emirates carried out during 1984-1994. In terms of coverage and analytical depth, country programmes summaries stand somewhere midway between in-depth country programme evaluations and individual project evaluations. They attempt to provide a comprehensive, descriptive picture of the Agency's co-operation with a Member State in a manner that will be particularly useful for programming decisions. The attempt is very much to describe - largely through statistical data - not to provide independent analysis and evaluation

  7. Inverse spectral results for Schroedinger operators on the unit interval with partial information given on the potentials

    International Nuclear Information System (INIS)

    Amour, L.; Raoux, T.; Faupin, J.

    2009-01-01

    We pursue the analysis of the Schroedinger operator on the unit interval in inverse spectral theory initiated in the work of Amour and Raoux [''Inverse spectral results for Schroedinger operators on the unit interval with potentials in Lp spaces,'' Inverse Probl. 23, 2367 (2007)]. While the potentials in the work of Amour and Raoux belong to L 1 with their difference in L p (1≤p k,1 spaces having their difference in W k,p , where 1≤p≤+∞, k(set-membership sign)(0,1,2). It is proved that two potentials in W k,1 ([0,1]) being equal on [a,1] are also equal on [0,1] if their difference belongs to W k,p ([0,a]) and if the number of their common eigenvalues is sufficiently high. Naturally, this number decreases as the parameter a decreases and as the parameters k and p increase

  8. Inverse spectral results for Schrödinger operators on the unit interval with partial information given on the potentials

    Science.gov (United States)

    Amour, L.; Faupin, J.; Raoux, T.

    2009-03-01

    We pursue the analysis of the Schrödinger operator on the unit interval in inverse spectral theory initiated in the work of Amour and Raoux ["Inverse spectral results for Schrödinger operators on the unit interval with potentials in Lp spaces," Inverse Probl. 23, 2367 (2007)]. While the potentials in the work of Amour and Raoux belong to L1 with their difference in Lp (1≤p<∞), we consider here potentials in Wk,1 spaces having their difference in Wk,p, where 1≤p≤+∞, k ɛ{0,1,2}. It is proved that two potentials in Wk,1([0,1]) being equal on [a,1] are also equal on [0,1] if their difference belongs to Wk,p([0,a]) and if the number of their common eigenvalues is sufficiently high. Naturally, this number decreases as the parameter a decreases and as the parameters k and p increase.

  9. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1992-09-01

    This document supplement 25 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2 (NUREG-0797), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, and 24 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several Unit 1 licensing items resolved since Supplement 24 was issued

  10. Safety Evaluation Report related to the operation of Comanche Peak Steam Electric Station, Unit 2 (Docket No. 50-446)

    International Nuclear Information System (INIS)

    1993-02-01

    Supplement 26 to the Safety Evaluation Report related to the operation of the Comanche Peak Steam Electric Station (CPSES), Unit 2, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC). The facility is located in Somervell County, Texas, approximately 40 miles southwest of Fort Worth, Texas. This supplement reports the status of certain issues that had not been resolved when the Safety Evaluation Report and Supplements 1, 2, 3, 4, 6, 12, 21, 22, 23, 24, and 25 to that report were published. This supplement deals primarily with Unit 2 issues; however, it also references evaluations for several licensing issues that relate to Unit 1, which have been resolved since Supplement 25 was issued

  11. Potential effects of forestry operations and associated best management practices on riparian wildlife species in the southeastern United States

    Science.gov (United States)

    Brooke M. Warrington; W. Michael Aust; Scott M. Barrett; W. Mark Ford; M. Chad Bolding; Andy Dolloff

    2016-01-01

    The US Fish and Wildlife Service is considering the addition of 374 riparian and aquatic species in the southeastern United States to the federal Threated and Endangered Species List. This recommendation is a result of a 2011 petition, which recognized forest operations as having negative effects on 51 percent of the listed species, citing research conducted in the...

  12. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1987-03-01

    This report, Supplement No. 4 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the applicant) for a license to operate the Beaver Valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved when the Safety Evaluation Report and its Supplements 1, 2, and 3 were published

  13. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9

  14. Safety evaluation report related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1986-05-01

    This report, Supplement No. 1 to the Safety Evaluation Report for the application filed by the Duquesne Light Company et al. (the applicant) for a license to operate the Beaver valley Power Station, Unit 2 (Docket No. 50-412), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time the Safety Evaluation Report was published

  15. Baseline risk assessment for the quarry residuals operable unit of the Weldon Spring Site, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. Cleanup of the site consists of several integrated components. The quarry residuals operable unit (QROU), consisting of the Weldon Spring quarry and its surrounding area, is one of four operable units being evaluated. In accordance with requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE is conducting a remedial investigation/feasibility study (RI/FS) to determine the proper response to address various contaminated media that constitute the QROU. Specifically, the operable unit consists of the following areas and media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and the bulk waste; groundwater underlying the quarry and surrounding area; and other media located in the surrounding vicinity of the quarry, including surface water and sediment at Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek. An initial evaluation of conditions at the quarry area identified remaining data requirements needed to support the conceptual site exposure and hydrogeological models. These data requirements are discussed in the RI/FS work plan issued in January 1994. Soil contamination located at a property adjacent to the quarry, referred to as Vicinity Property 9 (VP9), was originally part of the scope of the QROU, as discussed in the work plan. However, a decision was subsequently made to remediate this vicinity property as part of cleanup activities for the chemical plant operable unit, as provided for in the Record of Decision (ROD). Remediation of VP9 was completed in early 1996. Hence, this baseline risk assessment (BRA) does not address VP9.

  16. Draft environmental statement related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-07-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of Millstone Nuclear Power Station, Unit 3, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  17. Introducing SONS, a Tool for Operational Taxonomic Unit-Based Comparisons of Microbial Community Memberships and Structures

    OpenAIRE

    Schloss, Patrick D.; Handelsman, Jo

    2006-01-01

    The recent advent of tools enabling statistical inferences to be drawn from comparisons of microbial communities has enabled the focus of microbial ecology to move from characterizing biodiversity to describing the distribution of that biodiversity. Although statistical tools have been developed to compare community structures across a phylogenetic tree, we lack tools to compare the memberships and structures of two communities at a particular operational taxonomic unit (OTU) definition. Furt...

  18. Safety Evaluation Report related to the operation of Shoreham Nuclear Power Station, Unit No. 1 (Docket No. 50-322)

    International Nuclear Information System (INIS)

    1989-04-01

    Supplement 10 (SSER 10) to the Safety Evaluation Report on Long Island Lighting Company's application for a license to operate the Shoreham Nuclear Power Station, Unit 1, located in Suffolk County, New York, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement addresses several items that have been reviewed by the staff since the previous supplement was issued

  19. Operating power plant experience with condensate polishing units in morpholine/ammonia-OH cycle

    International Nuclear Information System (INIS)

    Kumbhar, A.G.; Padmakumari, T.V.; Narasimhan, S.V.; Mathur, P.K.

    1995-01-01

    Impurity removal efficiency of condensate polisher plant (CPP) in ammonium cycle is poor. Cost considerations demand CPP operation in amine-OH cycle. With certain precautions such as higher regeneration levels, good regenerent quality, minimized cross contamination, continuous monitoring of influent and effluent and provision for 100% standby bed, it is possible to operate CPP beyond H-OH cycle while keeping the effluent impurities within the specified limits. This paper presents problem associated with the Madras Atomic Power Station (MAPS) CPP operation in morpholine-OH form and Korba Super Thermal Power Station (KSTPS) CPP in ammonia-OH form and suggested remedial measures. (author). 3 refs., 1 fig

  20. Surface radiation survey and soil sampling of the 300-FF-1 operable unit, Hanford Site, southeastern Washington: A case study

    International Nuclear Information System (INIS)

    Teel, S.S.; Olsen, K.B.

    1990-10-01

    The methods used for conducting a radiological characterization of the soil surface for the Phase I Remedial Investigation of a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site is presented via a case study. The study site is an operable unit (300-FF-1) located in and adjacent to the 300 Area of the US Department of Energy's Hanford Site in southeastern Washington State. The operable unit contains liquid and solid waste disposal facilities associated with nuclear fuels fabrication. Continuous surface radiation surveying and soil sampling of selected locations were conducted. Contamination was found in several locations within the operable unit including areas near the liquid and solid waste disposal facilities. Instruments used during surveying included portable beta/gamma (P-11) detectors, and the Ultrasonic Ranging and Data System using an NaI (Tl) detector. Laboratory analyses results indicate that above-background radiation levels were primarily due to the presence of uranium. Both types of field instruments used in the study were effective in detecting surface contamination from radionuclides; however, each had specific advantages. Guidelines are presented for the optimum use of these instruments when performing a radiological characterization of the soil surface. 4 refs., 3 figs., 3 tabs

  1. Influence of unit operations on the levels of polyacetylenes in minimally processed carrots and parsnips: An industrial trial.

    Science.gov (United States)

    Koidis, Anastasios; Rawson, Ashish; Tuohy, Maria; Brunton, Nigel

    2012-06-01

    Carrots and parsnips are often consumed as minimally processed ready-to-eat convenient foods and contain in minor quantities, bioactive aliphatic C17-polyacetylenes (falcarinol, falcarindiol, falcarindiol-3-acetate). Their retention during minimal processing in an industrial trial was evaluated. Carrot and parsnips were prepared in four different forms (disc cutting, baton cutting, cubing and shredding) and samples were taken in every point of their processing line. The unit operations were: peeling, cutting and washing with chlorinated water and also retention during 7days storage was evaluated. The results showed that the initial unit operations (mainly peeling) influence the polyacetylene retention. This was attributed to the high polyacetylene content of their peels. In most cases, when washing was performed after cutting, less retention was observed possibly due to leakage during tissue damage occurred in the cutting step. The relatively high retention during storage indicates high plant matrix stability. Comparing the behaviour of polyacetylenes in the two vegetables during storage, the results showed that they were slightly more retained in parsnips than in carrots. Unit operations and especially abrasive peeling might need further optimisation to make them gentler and minimise bioactive losses. Copyright © 2011 Elsevier Ltd. All rights reserved.

  2. Modeling and Control of Low Voltage Flexible Units for Enhanced Operation of Distribution Feeders

    DEFF Research Database (Denmark)

    Raboni, Pietro; Hu, Weihao; Chaudhary, Sanjay

    2013-01-01

    In some networks Distributed Generators (DGs) are phasing out conventional power plants in terms of power production but still large efforts are required for providing ancillary services. In this paper the usage of fast response units like a Micro Turbines (MT) and a stationary Electric Vehicle...... Battery (EVB) is proposed for providing primary regulation in grid connected mode and for hierarchically manage an islanded LV distribution feeder. The unit models are described and a novel EVB model directly based on manufacturer’s data is proposed and evaluated comparing its performances with Sim...

  3. Mass and number size distributions of emitted particulates at five important operation units in a hazardous industrial waste incineration plant.

    Science.gov (United States)

    Lin, Chi-Chi; Huang, Hsiao-Lin; Hsiao, Wen-Yuan

    2016-01-01

    Past studies indicated particulates generated by waste incineration contain various hazardous compounds. The aerosol characteristics are very important for particulate hazard control and workers' protection. This study explores the detailed characteristics of emitted particulates from each important operation unit in a rotary kiln-based hazardous industrial waste incineration plant. A dust size analyzer (Grimm 1.109) and a scanning mobility particle sizer (SMPS) were used to measure the aerosol mass concentration, mass size distribution, and number size distribution at five operation units (S1-S5) during periods of normal operation, furnace shutdown, and annual maintenance. The place with the highest measured PM10 concentration was located at the area of fly ash discharge from air pollution control equipment (S5) during the period of normal operation. Fine particles (PM2.5) constituted the majority of the emitted particles from the incineration plant. The mass size distributions (elucidated) made it clear that the size of aerosols caused by the increased particulate mass, resulting from work activities, were mostly greater than 1.5 μm. Whereas the number size distributions showed that the major diameters of particulates that caused the increase of particulate number concentrations, from work activities, were distributed in the sub micrometer range. The process of discharging fly ash from air pollution control equipment can significantly increase the emission of nanoparticles. The mass concentrations and size distributions of emitted particulates were different at each operation unit. This information is valuable for managers to take appropriate strategy to reduce the particulate emission and associated worker exposure.

  4. Humboldt Bay Power Plant, Unit 3. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 196,742 MWH with the reactor on line 4078 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, and reportable occurrences

  5. Three Mile Island Nuclear Station, Unit 1. Semiannual operating report No. 4, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Information is presented concerning operations, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, solid radioactive waste, primary coolant chemistry, personel radiation, and refueling. Histograms of thermal power vs. time are included

  6. Cognitive Requirements for Small Unit Leaders in Military Operations in Urban Terrain

    National Research Council Canada - National Science Library

    Phillips, Jennifer

    1998-01-01

    .... A cognitive task analysis, based on in depth interviews with subject matter experts (n=7), was conducted to expose the cognitive aspects of expertise existing within one important MOUT task, building clearing operations...

  7. Shutdown and low-power operation at commercial nuclear power plants in the United States

    International Nuclear Information System (INIS)

    1993-09-01

    The report contains the results of the NRC Staff's evaluation of shutdown and low-power operations at US commercial nuclear power plants. The report describes studies conducted by the staff in the following areas: Operating experience related to shutdown and low-power operations, probabilistic risk assessment of shutdown and low-power conditions and utility programs for planning and conducting activities during periods the plant is shut down. The report also documents evaluations of a number of technical issues regarding shutdown and low-power operations performed by the staff, including the principal findings and conclusions. Potential new regulatory requirements are discussed, as well as potential changes in NRC programs. A draft report was issued for comment in February 1992. This report is the final version and includes the responses to the comments along with the staff regulatory analysis of potential new requirements

  8. 78 FR 53482 - Entergy Operations, Inc., River Bend Station, Unit 1; Exemption

    Science.gov (United States)

    2013-08-29

    ... effect on the quality of the human environment (78 FR 50454; August 19, 2013). This exemption is... Regulatory Commission. Michele G. Evans, Director, Division of Operating Reactor Licensing, Office of Nuclear...

  9. Superfund Record of Decision (EPA Region 6): United Nuclear Corporation, Mckinley County, New Mexico, ground-water operable unit (first remedial action) September 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The United Nuclear Corporation (UNC) site is located approximately 17 miles northeast of Gallup, New Mexico in McKinley County. The site operated as a State-licensed uranium mill facility from June 1977 to May 1982. It includes an ore-processing mill (about 25 acres) and an unlined tailings pond area (about 100 acres). In July 1979, approximately 23 million gallons of tailings and pond water were released to a nearby river as a result of a dam breach in the tailings pond area. The site damage was repaired; however, attention was focused on ground-water contamination resulting from tailings seepage. Nevertheless, the offsite migration of radionuclides and chemical constituents from uranium milling byproduct materials into the ground water, as well as to surface water and air, are still principal threats at the site. The remedial action will address onsite ground water contamination. Source control and onsite surface reclamation will be implemented under the direction of the Nuclear Regulatory Commission and integrated with this ground water operable unit. The primary contaminants of concern affecting the ground water are metals including arsenic, and radioactive substances including radium-226/228 and gross alpha. The selected remedial action for the site is included

  10. Toeplitz and Hankel operators and Dixmier trances on the unit ball of C-n

    Czech Academy of Sciences Publication Activity Database

    Engliš, Miroslav; Guo, K.; Zhang, G.

    2009-01-01

    Roč. 137, č. 11 (2009), s. 3669-3678 ISSN 0002-9939 R&D Projects: GA ČR(CZ) GA201/06/0128 Institutional research plan: CEZ:AV0Z10190503 Keywords : Schatten-von Neumann classes * Macaev classes * trace * Dixmier trace * Toeplitz operators * Hankel operators Subject RIV: BA - General Mathematics Impact factor: 0.640, year: 2009

  11. Main indicators used in french PWR units for safety, operation and maintenance

    International Nuclear Information System (INIS)

    Guio, J.M. de

    1990-01-01

    The development of analyses aimed at improving nuclear plant operations through an optimum use of experience feedback naturally leads to the implementation of trend indicators in the fields of safety, operation and maintenance. This process, part of the more general framework of promoting safety culture, facilitates collective thinking on these matters at the local site level, and, at the national level, allows a clearer definition of the main lines of strategy and helps coordinate the resulting actions

  12. 76 FR 66051 - Availability of the Fiscal Year 2010 United States Special Operations Command (USSOCOM) Inventory...

    Science.gov (United States)

    2011-10-25

    ... DEPARTMENT OF DEFENSE Office of the Secretary Availability of the Fiscal Year 2010 United States... Authorization Act for Fiscal Year 2008 (NDAA 08) Section 807, the Director of Procurement USSOCOM and the Office of the Director, Defense Procurement and Acquisition Policy, Office of Strategic Sourcing (DPAP/SS...

  13. 40 CFR Table 21 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 21 Table 21 to Subpart UUU of Part 63... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Reforming Units As stated in § 63...

  14. 40 CFR Table 7 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units 7 Table 7 to Subpart UUU of Part 63... With Operating Limits for Metal HAP Emissions From Catalytic Cracking Units As stated in § 63.1564(c)(1...

  15. 40 CFR Table 14 to Subpart Uuu of... - Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Continuous Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 14 Table 14 to Subpart UUU of Part 63... Compliance With Operating Limits for Organic HAP Emissions From Catalytic Cracking Units As stated in § 63...

  16. Superfund record of decision (EPA Region 3), Westinghouse Elevator Company Plant, Operable Unit 2, Cumberland Township, Adams County, Gettysburg, PA, March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This Record of Decision (ROD) presents the selected remedial action for Operable Unit 2 (Soils) at the Westinghouse Elevator Company Plant Site in Adams County, Pennsylvania. The selected remedy for the soils at the Westinghouse Elevator Plant is No Additional Action for this Operable Unit. The other alternatives evaluated would produce little or no environmental benefit at substantial cost.

  17. Field measurement of the piping system vibration of Ko-Ri unit 4 during the load-following operation

    International Nuclear Information System (INIS)

    Chung, Tae-Young; Hong, Sung-Yull; Kim, Bum-Nyun.

    1989-01-01

    During the load-following operation of nuclear power plants, flow rate, temperature, and pressure in the piping system can be varied by changing the electric power output level, and these variations can cause different vibration phenomena in the piping system. The piping system vibration is important because it is directly related to the dynamic stress of the piping system and can affect the life of the piping system through structural fatigue. An assessment of vibration levels for the classes II and III piping systems of the Ko-Ri Unit 4950-MW nuclear power plant was performed according to the given pattern of the load-following operation to study its feasibility from the viewpoint of piping system vibration. The classes II and III piping system vibration of the Ko-Ri Unit 4 may not cause any potential problem under the given pattern of the load-following operation; however, it is recommended that long-term operation in the 85 to 95% power range be avoided as much as possible

  18. Computer aided design of operational units for tritium recovery from Li17Pb83 blanket of a DEMO fusion reactor

    International Nuclear Information System (INIS)

    Malara, C.; Viola, A.

    1995-01-01

    The problem of tritium recovery from Li 17 Pb 83 blanket of a DEMO fusion reactor is analyzed with the objective of limiting tritium permeation into the cooling water to acceptable levels. To this aim, a mathematical model describing the tritium behavior in blanket/recovery unit circuit has been formulated. By solving the model equations, tritium permeation rate into the cooling water and tritium inventory in the blanket are evaluated as a function of dimensionless parameters describing the combined effects of overall resistance for tritium transfer from Li 17 Pb 83 alloy to cooling water, circulating rate of the molten alloy in blanket/recovery unit circuit and extraction efficiency of tritium recovery unit. The extraction efficiency is, in turn, evaluated as a function of the operating conditions of recovery unit. The design of tritium recovery unit is then optimized on the basis of the above parametric analysis and the results are herein reported and discussed for a tritium permeation limit of 10 g/day into the cooling water. 14 refs., 9 figs., 2 tabs

  19. Interim safety evaluation report related to operation of Enrico Fermi Atomic Power Plant, Unit 2, Detroit Edison Company

    International Nuclear Information System (INIS)

    1977-09-01

    This interim report summarizes the scope and results of the radiological safety review performed to date by the NRC staff with respect to the operating license phase for the Enrico Fermi Atomic Power Plant, Unit 2. The major effort was the review of the facility design and proposed operating procedures described in applicant's Final Safety Analysis Report. In the course of the review, several meetings were held with representatives of the applicant to discuss plant design, construction and proposed operation. Additional information was requested, which the applicant provided through Amendment 7 to the Final Safety Analysis Report. A chronology of the principal actions relating to the review of the application is attached as Appendix A to the report. The Final Safety Analysis Report and amendments thereto are available for public inspection at the Nuclear Regulatory Commission Public Document Room, 1717 H Street, N. W., Washington, D.C. and at Monroe County Library System, 3700 South Custer Road, Monroe, Michigan 48161

  20. Final environmental statement related to the operation of Clinton Power Station, Unit No. 1. Docket No. 50-461

    International Nuclear Information System (INIS)

    1982-05-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Clinton Power Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and ridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to Lake Clinton and Salt Creek are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The hydrothermal analyses indicate that under certain meteorological conditions (1-in-50-year drought), the plant would have to be operated at reduced power levels in order to meet the thermal standards established by the Illinois Pollution Control Board Order PCB 81-82. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilties should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. Contentions associated with environmental issues accepted during the operating-license hearing are related to assessment of effects of low-level radiation. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of Clinton

  1. A stochastic assessment of cavity flooding strategy involving operator action for Yonggwang 3 and 4 units

    International Nuclear Information System (INIS)

    Kim, J.; Yu, D.; Ha, J.

    1997-01-01

    The author presents a new approach to the evaluation of an accident management strategy when an operator action is involved. This approach classifies the failure in implementing a given strategy into 4 possible states, and provides their corresponding quantification methods: 1) the failure of a diagnosis and decision-making by operators, 2) the failure of taking an action following a correct diagnosis, 3) the failure of a system operation following an adequate action, and 4) the failure due to a delayed action. The proposed methods were applied to assess a cavity flooding strategy that uses containment spray system (CSS), and the result shows that the methods are more appropriate in evaluating accident management strategies when human actions are involved

  2. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  3. Oxy-fired boiler unit and method of operating the same

    Science.gov (United States)

    Lou, Xinsheng; Zhang, Jundong; Joshi, Abhinaya; McCombe, James A.; Levasseur, Armand A.

    2016-12-06

    An oxy-combustion boiler unit is disclosed which includes a furnace for combusting fuel and for emitting flue gas resulting from combustion. The furnace has first, second and third combustion zones, and an air separation unit for separating oxygen gas from air and providing a first portion of the separated oxygen to a first oxidant flow, a second portion to a second oxidant flow, and a third portion of the separated oxygen gas to the first, second, and third zones of the furnace. A controller can cause the separated oxygen gas to be distributed so that the first and second oxygen flows have a desired oxygen content, and so that the first, second, and third zones of the furnace receive a desired amount of oxygen based on a combustion zone stoichiometry control.

  4. Safety Evaluation Report related to the operation of LaSalle County Station, Units 1 and 2. Docket Nos. 50-373 and 50-374

    International Nuclear Information System (INIS)

    1984-03-01

    This supplement to the Safety Evaluation Report of Commonwealth Edison Company's application for a license to operate its La Salle County Station, Unit 2, located in Brookfield Township, La Salle County, Illinois, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement is to update evaluations on Unit 2 issues identified in the previous Safety Evaluation Report and Supplements that need resolution prior to issuance of the full power operating license for Unit 2

  5. Studying the dynamical characteristics of pumps in NPP unit auxiliary water system under operational conditions

    International Nuclear Information System (INIS)

    Belyaev, S.G.; Puzanov, A.I.; Belikov, V.P.; Dizik, B.S.

    1990-01-01

    Hydrodynamic loads appearing in the flow-through part of pump aggregates of the system of auxiliary water supply in NPP with variations in the operation modes are investigated. It is shown that during operation of centrifugal pumps the position of the mode on the pump characteristic plot must be controlled. When the mode point exceeds the limits of the working zone it results in a considerable increase of dynamic loads: pressure pulsation and vibration. As the flow rate increase the decrease in dynamic loads is recorded at low frequencies of about 2-4 Hz

  6. Prediction of operating parameters range for ammonia removal unit in coke making by-products

    Science.gov (United States)

    Tiwari, Hari Prakash; Kumar, Rajesh; Bhattacharjee, Arunabh; Lingam, Ravi Kumar; Roy, Abhijit; Tiwary, Shambhu

    2018-02-01

    Coke oven gas treatment plants are well equipped with distributed control systems (DCS) and therefore recording the vast amount of operational data efficiently. Analyzing the stored information manually from historians is practically impossible. In this study, data mining technique was examined for lowering the ammonia concentration in clean coke oven gas. Results confirm that concentration of ammonia in clean coke oven gas depends on the average PCDC temperature; gas scrubber temperatures stripped liquor flow, stripped liquor concentration and stripped liquor temperature. The optimum operating ranges of the above dependent parameters using data mining technique for lowering the concentration of ammonia is described in this paper.

  7. Scalable Mobile Ad Hoc Network (MANET) to Enhance Situational Awareness in Distributed Small Unit Operations

    Science.gov (United States)

    2015-06-01

    computing the algorithm is written in Python, a simple terminal programming language. At the top of that script was the integration to ROS and the rest of...etError    (1) where the refresh frequency is represented by Network in units of Hz and the angular speed of the Marine’s sweep rate...starts with: Java , C++, Python, and more. There are literally thousands if not hundreds of thousands, of projects, platforms, sensors, actuators

  8. Safety evaluation report related to the operation of Limerick Generating Station, Units 1 and 2 (Docket Nos. 50-352 and 50-353)

    International Nuclear Information System (INIS)

    1989-06-01

    In August 1983 the staff of the Nuclear Regulatory Commission issued its Safety Evaluation Report (NUREG-0991) regarding the application of the Philadelphia Electric Company (the licensee) for licenses to operate the Limerick Generating Station, Units 1 and 2, located on site in Montgomery and Chester Counties, Pennsylvania. Supplement 1 to NUREG-0991 was issued in December 1983. Supplements 2 and 3 were issued in October 1984. License NPF-27 for the low-power operation of Limerick Unit 1 was issued on October 26, 1984. Supplement 4 was issued in May, 1985, Supplement 5 was issued in July 1985, and Supplement 6 was issued in August 1985. These supplements addressed further issues that required resolution before Unit 1 proceeded beyond the 5-percent power level. The full-power operating license for Limerick Unit 1 (NPF-39) was issued August 8, 1985, and the unit has completed two cycles of operation. Supplement 7 was issued April 1989 to address some of the few significant design differences between Units 1 and 2, the resolution of issues that remained open when the Unit 1 full-power license was issued and an assessment of some of the issues that required resolution before issuance of an operating license for Unit 2. This supplement addresses the remaining issues that required resolution before issuance of and operating license for Unit 2

  9. Kewaunee Nuclear Power Plant, Unit 1. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 3,383,265.0 MWh with the generator on line for 6,926.8 hrs. Information is presented concerning operations, power generation, changes in technical specifications, modifications, steam generator tube inspection, containment leak rate tests, in-service inspection, maintenance, environmental technical specifications, and the radiological monitoring program

  10. Operator-system interaction language for a nuclear power unit. 4. Keyboards and menu

    International Nuclear Information System (INIS)

    Chachko, A.G.

    1996-01-01

    The article is devoted to the functional-linguistic analysis of keyboards, placed on the NPPs control panels. The front panels of keyboards are considered and the problems on information management and role distribution between the man and machine and the keyboard conveniences for operators are discussed

  11. H. B. Robinson Plant, Unit 2. Semiannual operating report No. 11, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,119,115 MW(e) with the generator on line 3,308 hrs. Information is presented concerning operation, power generation, shutdowns, corrective maintenance, occupational radiation exposure, release of radioactive materials, tests, inspections, refueling, and steam generator outage

  12. Technical Diagnostics of Ventilation Units for Energy Efficiency and Safety of Operation

    Directory of Open Access Journals (Sweden)

    Kuzin Evgeny

    2017-01-01

    Full Text Available The article considers the questions of application of technical diagnostics fan installations methods for providing safe operation, the system of the technical maintenance improvement and repair. Due to the feet that one of the most important aspects in fan operation in mining is energy efficiency and energy saving, the lack of the data in the control of the level in vibration of stationary sensors is shown. The necessity of taking into account the geometric parameters of the intake channel has been shown, and also the necessity of creation of the reference masks for the assessment of technical condition and energy efficiency when operating fan installations in mining. The results of technical diagnostics of the main fans using the methods of vibration diagnostics are provided. Aspects of vibration at characteristic points are shown. The necessity for further accumulation of data characterizing vibration for adjustment of the reference masks and more accurate detection of defects and deviations from the energy-efficient mode of operation of the fan installations is given.

  13. San Onofre Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Gross electrical energy generated was 2,610,000 MWH with the generator on line 6,162.9 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, steam generator tube inspections, primary coolant chemistry, containment penetration leak tests, and radiological environmental monitoring

  14. Kewaunee Nuclear Power Plant, Unit 1. Semiannual operating report, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 1,700,492 MWh(e) with the reactor on line 3,797.02 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, radiochemistry, health physics, release of radioactive materials, reportable occurrences, design changes, reactor engineering, environmental technical specifications, and bio testing

  15. 40 CFR 63.1104 - Process vents from continuous unit operations: applicability assessment procedures and methods.

    Science.gov (United States)

    2010-07-01

    ...) Necessitating that the owner or operator make product in excess of demand. (e) TOC or Organic HAP concentration....306×10 −2 a Use according to procedures outlined in this section. MJ/scm = Mega Joules per standard cubic meter. scm/min = Standard cubic meters per minute. (2) Nonhalogenated process vents. The owner or...

  16. Beaver Valley Power Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    Net electrical energy generated was 441,530 MWH with the generator on line 1714.9 hours. Information is presented concerning operations, maintenance, changes, licensee event reports, power generation, shutdowns and forced power reductions, personnel radiation exposures, and unique reporting requirements

  17. Millstone Nuclear Power Station, Unit 1. Annual operating report: 1 January--31 December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 3,752,445 MWh with the generator on line 6,682 hrs. Information is presented concerning operations; shutdowns and power reductions; refueling; maintenance; failed fuel elements; power generation; occupational personnel radiation exposure; and changes in technical specifications, plant design, and key supervisory personnel

  18. SEP operating history of the Dresden Nuclear Power Station Unit 2

    International Nuclear Information System (INIS)

    Mays, G.T.; Harrington, K.H.

    1983-01-01

    206 forced shutdowns and power reductions were reviewed, along with 631 reportable events and other miscellaneous documentation concerning the operation of Dresden-2, in order to indicate those areas of plant operation that compromised plant safety. The most serious plant challenge to plant safety occurred on June 5, 1970; while undergoing power testing at 75% power, a spurious signal in the reactor pressure control system caused a turbine trip followed by a reactor scram. Subsequent erratic water level and pressure control in the reactor vessel, compounded by a stuck indicator pen on a water level monitor-recorder and inability of the isolation condenser to function, led to discharge of steam and water through safety valves into the reactor drywell. No significant contamination was discharged. There was no pressure damage or the reactor vessel of the drywell containment walls. Six areas of operation that should be of continued concern are diesel generator failures, control rod and rod drive malfunctions, radioactive waste management/health physics program problems, operator errors, turbine control valve and EHC problems, and HPCI failures. All six event types have continued to recur

  19. 77 FR 31402 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2...

    Science.gov (United States)

    2012-05-25

    ... SGTR accident. At normal operating pressures, leakage from primary water stress corrosion cracking... change during the 30-day comment period such that failure to act in a timely way would result, for... the requestor may challenge an NRC staff determination granting access to SUNSI whose release would...

  20. Nine Mile Point Nuclear Station, Unit 1. Annual report of operation: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 4,112,827 MWH with the reactor on line 7,727.67 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, and fuel performance

  1. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report No. 3

    International Nuclear Information System (INIS)

    1977-01-01

    After a month-by-month summary of operations and maintenance activities, data are presented concerning modifications, procedure changes, and man-rem radiation doses. Appendices include information on the main generator outage, leak rate testing, refueling outage, recirculation pump modifications, and instrument drift

  2. Duane Arnold Energy Center, Unit 1. Annual operating report: January--December 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved March 23, 1974 and commercial generation of power began February 1, 1975. A narrative summary describes plant operations. Information is presented concerning outages and forced power reductions, radioactivity releases and radiation exposures, failed fuel inspections, changes in plant design and procedures, and special tests performed

  3. Oyster Creek Nuclear Power Plant, Unit 1. Annual operating report No. 1: January--December 1976

    International Nuclear Information System (INIS)

    Net electrical power generated was 3,860,347 MWH with the reactor on line 6,967.3 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, reportable occurrences, fuel performance, and leak rate testing

  4. Technical Diagnostics of Ventilation Units for Energy Efficiency and Safety of Operation

    Science.gov (United States)

    Kuzin, Evgeny; Shahmanov, Vitality; Dubinkin, Dmitriy

    2017-11-01

    The article considers the questions of application of technical diagnostics fan installations methods for providing safe operation, the system of the technical maintenance improvement and repair. Due to the feet that one of the most important aspects in fan operation in mining is energy efficiency and energy saving, the lack of the data in the control of the level in vibration of stationary sensors is shown. The necessity of taking into account the geometric parameters of the intake channel has been shown, and also the necessity of creation of the reference masks for the assessment of technical condition and energy efficiency when operating fan installations in mining. The results of technical diagnostics of the main fans using the methods of vibration diagnostics are provided. Aspects of vibration at characteristic points are shown. The necessity for further accumulation of data characterizing vibration for adjustment of the reference masks and more accurate detection of defects and deviations from the energy-efficient mode of operation of the fan installations is given.

  5. Three Mile Island Nuclear Station, Unit 1. 1976 annual operating report

    International Nuclear Information System (INIS)

    1977-01-01

    Net electrical power generated was 4,335,625 MWh with the reactor on line 5,747.5 hrs. Information is presented concerning operations; specification, procedures, and FSAR changes; corrective maintenance; irradiated fuel examinations; radioactive effluent releases; personnel radiation exposures; shutdowns; and forced power reductions

  6. Pilgrim Nuclear Power Station, Unit 1. Fifth semiannual operating and maintenance report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    During this period the reactor was critical for 3,550.3 hrs and the net electrical power generated was 1,973,033 MWH. Information is presented concerning operations, maintenance, radioactive effluents, environmental monitoring, and radioactive materials released to unrestricted areas. (U.S.)

  7. Arkansas Nuclear One, Unit 1. Semiannual operating report, July--December 1975

    International Nuclear Information System (INIS)

    1976-01-01

    Net electrical power generated was 2,857,559 MWh(e) with the reactor on line 3,751.6 hrs. Information is presented concerning operations, power generation, shutdowns, corrective maintenance, occupational radiation exposure, release of radioactive materials, design changes, fuel performance, and results of leak rate tests

  8. Characterisation of radioactive waste at Cernavoda NPP Unit 1 during normal operation

    International Nuclear Information System (INIS)

    Iordache, M.; Bujoreanu, L.; Popescu, I. V.

    2008-01-01

    During the operation of a nuclear plant significant quantities of radioactive waste results that have a very large diversity. At Cernavoda NPP the important waste categories are non-radioactive wastes and radioactive wastes, which are manipulated completely different from which other. For a CANDU type reactor, the production of radioactive wastes is due to contamination with the following types of radioactive substances: - fission products resulting from nuclear fuel burning; - activated products of materials which form part of the technological systems; - activated products of process fluids. Radioactive wastes can be in solid, liquid or gas form. At Cernavoda NPP the solid wastes represent about 70% of the waste volume which is produced during plant operation and as a consequence of maintenance and decontamination activities. The most important types of solid wastes that are obtained and then handled, processed (if required) and temporarily stored are: solid low level radioactive wastes (classified as compact and non-compact), solid medium radioactive wastes, spent resins, used filters and filter cartridges. The liquid radioactive waste class includes organic liquids (used oil, scintillator liquids and used solvents) and aqueous wastes resulting from process system operating, decontamination and maintenance operations. Radioactive gas wastes occur subsequent to the fission process inside the fuel elements as well as due to the process fluids neutron activation in the reactor systems. As result of the plant operation, iodine, noble gases, tritium and radioactive particles occur and are passed to the ventilation stack in a controlled manner so that an exceeding of the maximum permissible concentrations of radioactive material to the environment should not occur. (authors)

  9. Potential contribution of currently operating nuclear-fueled electric-generating units to reducing US oil consumption

    International Nuclear Information System (INIS)

    Koppe, R.H.; Olson, E.A.J.; Van Howe, K.R.

    1980-01-01

    This study examines the prospect for performance improvement in the 62 light water reactors in operation in the US as of the end of last year and which are deemed to have current commercial design features. These units represent a total net capacity of 49,481 MW(e). In the last two years (1978 to 1979), total capacity factor losses for these units was 36.5%. This study finds that in the short-term, capacity factor improvement of about 16% could be achieved, for example, in response to a short-term energy crisis. In the long-term a gain of perhaps 18% could be achieved. Such gains would represent a decrease in equivalent oil consumption of approximately 350,000 barrels a day. In addition, this study evaluated potential increases in the operating power level of these units, and concluded that a short term power level increase of about 2500 MW(e) could be achieved, in addition to a long term increase of about 1700 MW(e). This total short term power level increase would be equivalent to 138,000 barrels of oil per day

  10. Implementation of Networking-by-Touch to Small Unit, Network-Enabled Operations

    Science.gov (United States)

    2010-09-01

    consumer electronics and wearable devices etc., which are further exploit later in the chapter. 4 . Touch The body’s sense of touch is a potentially...consoles including Sony’s Playstation 2, Nintendo’s GameCube and Wii, and Microsoft’s X-Box and X-box 360. 56 6. Tactile Displays Embedded in Consumer ...2010 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4 . TITLE AND SUBTITLE Implementation of Networking-by-Touch to Small Unit, Network-Enabled

  11. Non-governmental organizational health operations in humanitarian crises: the case for technical support units.

    Science.gov (United States)

    Greenough, P Gregg; Nazerali, Rahim; Fink, Sheri; VanRooyen, Michael J

    2007-01-01

    As the humanitarian health response industry grows, there is a need for technical health expertise that can build an evidence base around outcome measures and raise the quality and accountability of the health relief response. We propose the formation of technical support units (TSUs), entities of health expertise institutionalized within humanitarian non-governmental organizations (NGOs), which will bridge the gap between the demand for evidence-based, humanitarian programming and the field capacity to accomplish it. With the input of major humanitarian NGOs and donors, this paper discusses the attributes and capacities ofTSUs; and the mechanisms for creating and enhancing TSUs within the NGO management structure.

  12. Does the United States’ Strategic Mobility Program Support the Needs of Operational Commanders

    Science.gov (United States)

    2010-10-01

    from horrific droughts and a “famine of Biblical proportions.” 18 In late 1992, over one-half million Somalis met their death as victims of the...United States cargo fleet was the fast sealift ship. The maximum draft of those ships, with a maximum weight load, was just under thirty-seven feet of...water. The fast sealift ship is the predecessor to the large-medium-speed roll-on roll-off vessel. The maximum available square footage of the fast

  13. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  14. Final environmental statement related to the operation of Callaway Plant, Unit No. 1 (Docket No. 50-483)

    International Nuclear Information System (INIS)

    1982-01-01

    The final environmental statement contains the second assessment of the environmental impact associated with operation of Callaway Plant Unit 1, pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Par 51, as amended, of the NRC's regulations. This statement examines: the purpose and need for the Callaway project, alternatives to the project, the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. No water-use impacts are expected from cooling-tower markup withdrawn from, or blowdown discharged into, the Missouri River. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts from cooling-tower drift and other emissions and dust will also be small. Impacts to historic and prehistoric sites will be negligible with the development and implementation of the applicant's cultural-resources management plan. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of the Callaway Plant. 18 figs., 16 tabs

  15. Operation of Browns Ferry, Units 1 and 2 following the March 22, 1975 fire. Safety evaluation report

    International Nuclear Information System (INIS)

    1976-03-01

    The Safety Evaluation Report issued February 23, 1976, presents the NRC evaluation regarding the acceptability of the restoration and modifications at the Browns Ferry Plant Units 1 and 2, following the March 22, 1975 fire, to establish that the facility may be operated in the restored and modified condition without endangering the health and safety of the public. The modifications involved enhancing separation of redundant safeguards equipment by some rerouting of cable and by the application of a fire-retardant coating to the cable; enhancing fire extinguishing capability by the addition of fixed spray and sprinkler systems and expanded smoke and heat detection systems; and enhancing the overall fire protection program by changes in procedures, training, and organization. The NRC staff indicated some items that remained to be resolved prior to operation and concluded that subject to their satisfactory resolution the restoration of Browns Ferry Nuclear Plants Units 1 and 2 including the modifications is acceptable and that there is reasonable assurance that the health and safety of the public will not be endangered by operation of the facility as restored and modified

  16. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  17. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  18. Emergency diesel generating sets for the 900 MW PWR units operation and maintenance policy

    International Nuclear Information System (INIS)

    Guillon, A.; Lallier, M.

    1986-01-01

    In order to improve the reliability of the emergency diesel generating EDF has taken steps to ensure that: - sets are only started up when they are really needed, in order to reduce the thermal cycles and the mechanical stresses associated with start-up. - the maintenance policy is adapted to the conditions of use, by including the notion of a start-up being equivalent to a predetermined number of hours of operation. (authors)

  19. A review of start-up operations on the first units of the 1300 MWe generation

    International Nuclear Information System (INIS)

    Meclot, B.; Lemagny Boc Lonlaygue, C.; Lavogiez, M.

    1986-01-01

    This paper describes and offers comments on the different phases of start-up on power stations of the P4 series. Then, one reviews incidents which occurred in the course of these start-up phases and, having highlighted the lessons to be learnt from the commissioning of these power stations, goes on to make a comparative study of 1300 and 900 MWe availability in the initial year of operation [fr

  20. Fort Calhoun Station, Unit 1. Annual operation report: January-December 1977 (including environmental report)

    International Nuclear Information System (INIS)

    1978-02-01

    Net electrical energy generated in 1977 was 2,922,683.7 MWH with the generator on line 6,959.8 hours. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, occupational personnel radiation exposures, and primary coolant chemistry. Data on radioactive effluent releases, meteorology, environmental monitoring, and potential radiation doses to individuals for July 7, 1977 to December 31, 1977 are also included