WorldWideScience

Sample records for trans-proteomic pipeline supports

  1. Processing Shotgun Proteomics Data on the Amazon Cloud with the Trans-Proteomic Pipeline*

    Science.gov (United States)

    Slagel, Joseph; Mendoza, Luis; Shteynberg, David; Deutsch, Eric W.; Moritz, Robert L.

    2015-01-01

    Cloud computing, where scalable, on-demand compute cycles and storage are available as a service, has the potential to accelerate mass spectrometry-based proteomics research by providing simple, expandable, and affordable large-scale computing to all laboratories regardless of location or information technology expertise. We present new cloud computing functionality for the Trans-Proteomic Pipeline, a free and open-source suite of tools for the processing and analysis of tandem mass spectrometry datasets. Enabled with Amazon Web Services cloud computing, the Trans-Proteomic Pipeline now accesses large scale computing resources, limited only by the available Amazon Web Services infrastructure, for all users. The Trans-Proteomic Pipeline runs in an environment fully hosted on Amazon Web Services, where all software and data reside on cloud resources to tackle large search studies. In addition, it can also be run on a local computer with computationally intensive tasks launched onto the Amazon Elastic Compute Cloud service to greatly decrease analysis times. We describe the new Trans-Proteomic Pipeline cloud service components, compare the relative performance and costs of various Elastic Compute Cloud service instance types, and present on-line tutorials that enable users to learn how to deploy cloud computing technology rapidly with the Trans-Proteomic Pipeline. We provide tools for estimating the necessary computing resources and costs given the scale of a job and demonstrate the use of cloud enabled Trans-Proteomic Pipeline by performing over 1100 tandem mass spectrometry files through four proteomic search engines in 9 h and at a very low cost. PMID:25418363

  2. Processing shotgun proteomics data on the Amazon cloud with the trans-proteomic pipeline.

    Science.gov (United States)

    Slagel, Joseph; Mendoza, Luis; Shteynberg, David; Deutsch, Eric W; Moritz, Robert L

    2015-02-01

    Cloud computing, where scalable, on-demand compute cycles and storage are available as a service, has the potential to accelerate mass spectrometry-based proteomics research by providing simple, expandable, and affordable large-scale computing to all laboratories regardless of location or information technology expertise. We present new cloud computing functionality for the Trans-Proteomic Pipeline, a free and open-source suite of tools for the processing and analysis of tandem mass spectrometry datasets. Enabled with Amazon Web Services cloud computing, the Trans-Proteomic Pipeline now accesses large scale computing resources, limited only by the available Amazon Web Services infrastructure, for all users. The Trans-Proteomic Pipeline runs in an environment fully hosted on Amazon Web Services, where all software and data reside on cloud resources to tackle large search studies. In addition, it can also be run on a local computer with computationally intensive tasks launched onto the Amazon Elastic Compute Cloud service to greatly decrease analysis times. We describe the new Trans-Proteomic Pipeline cloud service components, compare the relative performance and costs of various Elastic Compute Cloud service instance types, and present on-line tutorials that enable users to learn how to deploy cloud computing technology rapidly with the Trans-Proteomic Pipeline. We provide tools for estimating the necessary computing resources and costs given the scale of a job and demonstrate the use of cloud enabled Trans-Proteomic Pipeline by performing over 1100 tandem mass spectrometry files through four proteomic search engines in 9 h and at a very low cost. © 2015 by The American Society for Biochemistry and Molecular Biology, Inc.

  3. Security Support in Continuous Deployment Pipeline

    DEFF Research Database (Denmark)

    Ullah, Faheem; Raft, Adam Johannes; Shahin, Mojtaba

    2017-01-01

    Continuous Deployment (CD) has emerged as a new practice in the software industry to continuously and automatically deploy software changes into production. Continuous Deployment Pipeline (CDP) supports CD practice by transferring the changes from the repository to production. Since most of the C...... penetration tools. Our findings indicate that the applied tactics improve the security of the major components (i.e., repository, continuous integration server, main server) of a CDP by controlling access to the components and establishing secure connections.......Continuous Deployment (CD) has emerged as a new practice in the software industry to continuously and automatically deploy software changes into production. Continuous Deployment Pipeline (CDP) supports CD practice by transferring the changes from the repository to production. Since most of the CDP...

  4. Mindset Matters: Supporting Student Persistence Through The Developmental Mathematics Pipeline

    OpenAIRE

    Kiser, Tracey Nicole

    2016-01-01

    Abstract of the DissertationMindset Matters: Supporting Student Persistence Through The Developmental Mathematics PipelinebyTracey Nicole KiserDoctor of Education in Teaching and LearningUniversity of California, San Diego, 2016Christopher P. Halter, ChairDevelopmental mathematics is one of the most challenging leaks in the mathematics K-20 pipeline. Few students enter two-year colleges prepared to successfully engage in college-level mathematics classes. Many of students who place into devel...

  5. ANALYSIS OF LARGE LC-MS/MS DATASETS USING AMAZON WEB SERVICES AND THE TRANS-PROTEOMIC PIPELINE

    DEFF Research Database (Denmark)

    Slagel, Joseph; Deutsch, Eric; Mendoza, Luis

    in a timely manner. Compounding the problem is TPP’s iProphet which can significantly improve the confidence of identifications by combining the output of multiple search engines but then requires orders more searches to be performed. We show that cloud computing products like Amazon Web Services (AWS......) provides a viable solution to meet this need. Methods Amazon Web Services provides an especially flexible platform for enabling cloud computing applications by providing virtualized servers that are capable of executing custom virtual machine images, have almost unlimited and secure file storage...... on Amazon Web Services using the TPP command line tool amztpp. The first was a Canine dataset consisting of 982 runs from an LTQ Orbitrap organized in 35 groups. The second set is a Bovine dataset consisting of 1210 iTRAQ and non-iTRAQ runs from both a QSTAR XL and QSTAR Elite. Both datasets are processed...

  6. Chaos characteristics and least squares support vector machines based online pipeline small leakages detection

    International Nuclear Information System (INIS)

    Liu, Jinhai; Su, Hanguang; Ma, Yanjuan; Wang, Gang; Wang, Yuan; Zhang, Kun

    2016-01-01

    Small leakages are severe threats to the long distance pipeline transportation. An online small leakage detection method based on chaos characteristics and Least Squares Support Vector Machines (LS-SVMs) is proposed in this paper. For the first time, the relationship between the chaos characteristics of pipeline inner pressures and the small leakages is investigated and applied in the pipeline detection method. Firstly, chaos in the pipeline inner pressure is found. Relevant chaos characteristics are estimated by the nonlinear time series analysis package (TISEAN). Then LS-SVM with a hybrid kernel is built and named as hybrid kernel LS-SVM (HKLS-SVM). It is applied to analyze the chaos characteristics and distinguish the negative pressure waves (NPWs) caused by small leaks. A new leak location method is also expounded. Finally, data of the chaotic Logistic-Map system is used in the simulation. A comparison between HKLS-SVM and other methods, in terms of the identification accuracy and computing efficiency, is made. The simulation result shows that HKLS-SVM gets the best performance and is effective in error analysis of chaotic systems. When real pipeline data is used in the test, the ultimate identification accuracy of HKLS-SVM reaches 97.38% and the position accuracy is 99.28%, indicating that the method proposed in this paper has good performance in detecting and locating small pipeline leaks.

  7. A direct method of natural frequency analysis on pipeline conveying fluid with both ends supported

    International Nuclear Information System (INIS)

    Huang Yimin; Ge Seng; Wu Wei; Jie He

    2012-01-01

    Highlights: ► A direct method which derived from Ferrari's method was used to solve quartic equations. ► Frequency equations of pipeline conveying fluid with both ends supported was studied. ► Each order natural frequencies can be obtained by using the direct method. ► The first five critical flow velocities were obtained by using numerical method. - Abstract: The natural frequency equations of fluid–structure interaction in pipeline conveying fluid with both ends supported is investigated by a direct method, and the direct method is derived from Ferrari's method which is used to solve quartic equations. The dynamic equation of pipeline conveying fluid with two variables is obtained by Hamilton's variation principle based on Euler–Bernoulli Beam theory. By using the separation of variables method and the derived method from Ferrari's method, the natural frequency equations and the critical flow velocity equations of pipeline conveying fluid with both ends supported are obtained in mathematical decoupling. Each order natural frequencies and critical flow velocities can be obtained by using numerical method. The first five order dimensionless critical flow velocities are obtained, and the results indicate that clamped–simply supported is less stable than clamped–clamped supported and more stable than simply–simply supported. All the conclusions can be applied to nuclear installations and other engineering fields of improving the vibration.

  8. Business Leadership: Supporting Youth Development and the Talent Pipeline

    Science.gov (United States)

    Rosenblum, Elyse

    2007-01-01

    The Forum for Youth Investment has partnered with Corporate Voices for Working Families to support a Youth Transitions Task Force charged with identifying and promoting the corporate and public policies necessary to ensure that young people ages 14-21 have the opportunities to develop the skills and knowledge needed to be successful in work and in…

  9. A Cross-Layer Duty Cycle MAC Protocol Supporting a Pipeline Feature for Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Young-Chon Kim

    2011-05-01

    Full Text Available Although the conventional duty cycle MAC protocols for Wireless Sensor Networks (WSNs such as RMAC perform well in terms of saving energy and reducing end-to-end delivery latency, they were designed independently and require an extra routing protocol in the network layer to provide path information for the MAC layer. In this paper, we propose a new cross-layer duty cycle MAC protocol with data forwarding supporting a pipeline feature (P-MAC for WSNs. P-MAC first divides the whole network into many grades around the sink. Each node identifies its grade according to its logical hop distance to the sink and simultaneously establishes a sleep/wakeup schedule using the grade information. Those nodes in the same grade keep the same schedule, which is staggered with the schedule of the nodes in the adjacent grade. Then a variation of the RTS/CTS handshake mechanism is used to forward data continuously in a pipeline fashion from the higher grade to the lower grade nodes and finally to the sink. No extra routing overhead is needed, thus increasing the network scalability while maintaining the superiority of duty-cycling. The simulation results in OPNET show that P-MAC has better performance than S-MAC and RMAC in terms of packet delivery latency and energy efficiency.

  10. Strength and durability tests of pipeline supports for the areas of above-ground routing under the influence of operational loads

    Directory of Open Access Journals (Sweden)

    Surikov Vitaliy Ivanovich

    2014-03-01

    Full Text Available The present article deals with integrated research works and tests of pipeline supports for the areas of above-ground routing of the pipeline system “Zapolyarye - Pur-pe” which is laid in the eternally frozen grounds. In order to ensure the above-ground routing method for the oil pipeline “Zapolyarye - Pur-pe” and in view of the lack of construction experience in case of above-ground routing of oil pipelines, the leading research institute of JSC “Transneft” - LLC “NII TNN” over the period of August, 2011 - September, 2012 performed a research and development work on the subject “Development and production of pipeline supports and pile foundation test specimens for the areas of above-ground routing of the pipeline system “Zapolyarye - Pur-pe”. In the course of the works, the test specimens of fixed support, linear-sliding and free-sliding pipeline supports DN1000 and DN800 were produced and examined. For ensuring the stable structural reliability of the supports constructions and operational integrity of the pipelines the complex research works and tests were performed: 1. Cyclic tests of structural elements of the fixed support on the test bed of JSC “Diascan” by means of internal pressure and bending moment with the application of specially prepared equipment for defining the pipeline supports strength and durability. 2. Tests of the fixed support under the influence of limit operating loads and by means of internal pressure for confirming the support’s integrity. On the test bed there were simulated all the maximum loads on the support (vertical, longitudinal, side loadings, bending moment including subsidence of the neighboring sliding support and, simultaneously, internal pressure of the carried medium. 3. Cyclic tests of endurance and stability of the displacements of sliding supports under the influence of limit operating loads for confirming their operation capacity. Relocation of the pipeline on the sliding

  11. The relevance of thermal hydraulics pipeline simulation as a regulatory support tool

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Patricia Mannarino; Santos, Almir Beserra dos [Agencia Nacional do Petroleo, Gas Natural e Biocombustiveis (ANP), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The capacity definition of a pipeline, along with its allocation, is very relevant to assure market transparency, nondiscriminatory access, security of supply, and also to give consistent signs for expansion needs. Nevertheless, the capacity definition is a controversial issue, and may widely vary depending on the technical and commercial assumptions made. To calculate a pipeline's nominal capacity, there are a variety of simulation tools, which include steady state, transient and on-line computer programs. It is desirable that the simulation tool is robust enough to predict the pipeline's capacity under different conditions. There are many variables that impact the flow through a pipeline, like gas characteristics, pipe and environmental variables. Designing a thermal model is a time-consuming task that requests understanding the level of detail need, in order to achieve success in its application. This article discusses the capacity definition, its role and calculation guidelines, describes ANP's experience with capacity calculation and further challenges according to the new regulation, and debates the role of thermal hydraulic simulation as a regulatory tool. (author)

  12. Pipeline engineering

    CERN Document Server

    Liu, Henry

    2003-01-01

    PART I: PIPE FLOWSINTRODUCTIONDefinition and Scope Brief History of PipelinesExisting Major PipelinesImportance of PipelinesFreight (Solids) Transport by PipelinesTypes of PipelinesComponents of PipelinesAdvantages of PipelinesReferencesSINGLE-PHASE INCOMPRESSIBLE NEWTONIAN FLUIDIntroductionFlow RegimesLocal Mean Velocity and Its Distribution (Velocity Profile)Flow Equations for One-Dimensional AnalysisHydraulic and Energy Grade LinesCavitation in Pipeline SystemsPipe in Series and ParallelInterconnected ReservoirsPipe NetworkUnsteady Flow in PipeSINGLE-PHASE COMPRESSIBLE FLOW IN PIPEFlow Ana

  13. Growing and Supporting the Student and Early Career Pipeline in Earth and Space Sciences - A Spotlight on New AGU Initiatives

    Science.gov (United States)

    Hankin, E. R.; Williams, B. M.; Asher, P. M.; Furukawa, H.; Holm Adamec, B.; Lee, M.; Cooper, P.

    2015-12-01

    The American Geophysical Union (AGU) is home to more than 60,000 scientists from 139 countries. Included in this membership are approximately 20,000 (34%) student and early career members. Many well-established programs within AGU provide a dynamic forum for Earth and Space scientists to advance research, collaborate across disciplines, and communicate the importance and impact of science to society regardless of career stage—programs such as AGU publications, scientific meetings and conferences, honors and recognition, and other educational and scientific forums. Additionally, many AGU program initiatives focusing specifically on supporting student and early career scientists and the global talent pool pipeline ones are actively underway. These include both new and long-standing programs. This presentation will describe (1) the overall demographics and needs in Earth and Space sciences, and (2) AGU's coordinated series of programs designed to help attract, retain and support student and early career scientists—with an emphasis on new programmatic activities and initiatives targeting improved diversity. Included in this presentation are a description of the AGU BrightSTaRS Program, the AGU Berkner Program for international students, a newly established AGU Student & Early Career Conference, the AGU Virtual Poster Showcase initiative, the AGU Meeting Mentor program, and GeoLEAD—an umbrella program being jointly built by a coalition of societies to help address Earth and space sciences talent pool needs.

  14. Perspective: adopting an asset bundles model to support and advance minority students' careers in academic medicine and the scientific pipeline.

    Science.gov (United States)

    Johnson, Japera; Bozeman, Barry

    2012-11-01

    The authors contend that increasing diversity in academic medicine, science, technology, engineering, and mathematics requires the adoption of a systematic approach to retain minority high school and college students as they navigate the scientific pipeline. Such an approach should focus on the interrelated and multilayered challenges that these students face. The authors fuse an alternative conceptualization of the scientific and technical human capital theoretical framework and the theory of social identity contingencies to offer a conceptual model for targeting the critical areas in which minority students may need additional support to continue toward careers in science. Their proposed asset bundles model is grounded in the central premise that making greater progress in recruiting and retaining minorities likely requires institutions to respond simultaneously to various social cues that signal devaluation of certain identities (e.g., gender, race, socioeconomic status). The authors define "asset bundles" as the specific sets of abilities and resources individuals develop that help them succeed in educational and professional tasks, including but not limited to science and research. The model consists of five asset bundles, each of which is supported in the research literature as a factor relevant to educational achievement and, the authors contend, may lead to improved and sustained diversity: educational endowments, science socialization, network development, family expectations, and material resources. Using this framework, they suggest possible ways of thinking about the task of achieving diversity as well as guideposts for next steps. Finally, they discuss the feasibility of implementing such an approach.

  15. Supporting the minority physician pipeline: providing global health experiences to undergraduate students in the United States-Mexico border region.

    Science.gov (United States)

    Burgos, Jose L; Yee, Daniel; Csordas, Thomas; Vargas-Ojeda, Adriana C; Segovia, Luis A; Strathdee, Steffanie A; Olivares-Nevarez, Jose A; Ojeda, Victoria D

    2015-01-01

    The sizeable US Latino population calls for increasing the pipeline of minority and bilingual physicians who can provide culturally competent care. Currently, only 5.5% of US providers are Hispanic/Latino, compared with 16% of the US population (i.e., >50.5 million persons). By 2060, it is predicted that about one-third of all US residents will be of Latino ethnicity. This article describes the Health Frontiers in Tijuana Undergraduate Internship Program (HFiT-UIP), a new quarterly undergraduate internship program based at a US-Mexico binational student-run free clinic and sponsored by the University of California, San Diego School of Medicine and the Universidad Autónoma de Baja California in Tijuana, Mexico. The HFiT-UIP provides learning opportunities for students and underrepresented minorities interested in medical careers, specifically Latino health. The HFiT-UIP might serve as a model for other educational partnerships across the US-Mexico border region and may help minority and other undergraduates seeking academic and community-based enrichment experiences. The HFiT-UIP can also support students' desires to learn about Latino, border, and global health within resource-limited settings.

  16. Supporting the minority physician pipeline: providing global health experiences to undergraduate students in the United States–Mexico border region

    Directory of Open Access Journals (Sweden)

    Jose L. Burgos

    2015-06-01

    Full Text Available Background: The sizeable US Latino population calls for increasing the pipeline of minority and bilingual physicians who can provide culturally competent care. Currently, only 5.5% of US providers are Hispanic/Latino, compared with 16% of the US population (i.e., >50.5 million persons. By 2060, it is predicted that about one-third of all US residents will be of Latino ethnicity. Activities and outcomes: This article describes the Health Frontiers in Tijuana Undergraduate Internship Program (HFiT-UIP, a new quarterly undergraduate internship program based at a US–Mexico binational student-run free clinic and sponsored by the University of California, San Diego School of Medicine and the Universidad Autónoma de Baja California in Tijuana, Mexico. The HFiT-UIP provides learning opportunities for students and underrepresented minorities interested in medical careers, specifically Latino health. Discussion: The HFiT-UIP might serve as a model for other educational partnerships across the US–Mexico border region and may help minority and other undergraduates seeking academic and community-based enrichment experiences. The HFiT-UIP can also support students’ desires to learn about Latino, border, and global health within resource-limited settings.

  17. Supporting the minority physician pipeline: providing global health experiences to undergraduate students in the United States–Mexico border region

    Science.gov (United States)

    Burgos, Jose L.; Yee, Daniel; Csordas, Thomas; Vargas-Ojeda, Adriana C.; Segovia, Luis A.; Strathdee, Steffanie A.; Olivares-Nevarez, Jose A.; Ojeda, Victoria D.

    2015-01-01

    Background The sizeable US Latino population calls for increasing the pipeline of minority and bilingual physicians who can provide culturally competent care. Currently, only 5.5% of US providers are Hispanic/Latino, compared with 16% of the US population (i.e., >50.5 million persons). By 2060, it is predicted that about one-third of all US residents will be of Latino ethnicity. Activities and outcomes This article describes the Health Frontiers in Tijuana Undergraduate Internship Program (HFiT-UIP), a new quarterly undergraduate internship program based at a US–Mexico binational student-run free clinic and sponsored by the University of California, San Diego School of Medicine and the Universidad Autónoma de Baja California in Tijuana, Mexico. The HFiT-UIP provides learning opportunities for students and underrepresented minorities interested in medical careers, specifically Latino health. Discussion The HFiT-UIP might serve as a model for other educational partnerships across the US–Mexico border region and may help minority and other undergraduates seeking academic and community-based enrichment experiences. The HFiT-UIP can also support students’ desires to learn about Latino, border, and global health within resource-limited settings. PMID:26088189

  18. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2012-01-01

    Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst.......Artiklen analyserer grundlaget for Leadership Pipeline modellen med henblik på en vurdering af substansen bag modellen, og perspektiverne for generalisering af modellen til en dansk organisatorisk kontekst....

  19. Chechnya: the pipeline front

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-11-01

    This article examines the impact of the Russian campaign against Chechnya on projects for oil and gas pipelines from the new Caspian republics, which are seeking financial support. Topics discussed include the pipeline transport of oil from Azerbaijan through Chechnya to the Black Sea, the use of oil money to finance the war, the push for non-Russian export routes, the financing of pipelines, the impact of the war on the supply of Russian and Turkmenistan gas to Turkey, the proposed construction of the Trans Caspian pipeline, the weakening of trust between Russia and its neighbours, and the potential for trans Caucasus republics to look to western backers due to the instability of the North Caucasus. (UK)

  20. Leadership Pipeline

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård

    2013-01-01

    I artiklen undersøges det empiriske grundlag for Leader- ship Pipeline. Først beskrives Leadership Pipeline modellen om le- delsesbaner og skilleveje i opadgående transitioner mellem orga- nisatoriske ledelsesniveauer (Freedman, 1998; Charan, Drotter and Noel, 2001). Dernæst sættes fokus på det...... forholdet mellem kontinuitet- og diskontinuitet i ledel- seskompetencer på tværs af organisatoriske niveauer præsenteres og diskuteres. Afslutningsvis diskuteres begrænsningerne i en kompetencebaseret tilgang til Leadership Pipeline, og det foreslås, at succesfuld ledelse i ligeså høj grad afhænger af...

  1. California Natural Gas Pipelines: A Brief Guide

    Energy Technology Data Exchange (ETDEWEB)

    Neuscamman, Stephanie [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Price, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Pezzola, Genny [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Glascoe, Lee [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-01-22

    The purpose of this document is to familiarize the reader with the general configuration and operation of the natural gas pipelines in California and to discuss potential LLNL contributions that would support the Partnership for the 21st Century collaboration. First, pipeline infrastructure will be reviewed. Then, recent pipeline events will be examined. Selected current pipeline industry research will be summarized. Finally, industry acronyms are listed for reference.

  2. CPL: Common Pipeline Library

    Science.gov (United States)

    ESO CPL Development Team

    2014-02-01

    The Common Pipeline Library (CPL) is a set of ISO-C libraries that provide a comprehensive, efficient and robust software toolkit to create automated astronomical data reduction pipelines. Though initially developed as a standardized way to build VLT instrument pipelines, the CPL may be more generally applied to any similar application. The code also provides a variety of general purpose image- and signal-processing functions, making it an excellent framework for the creation of more generic data handling packages. The CPL handles low-level data types (images, tables, matrices, strings, property lists, etc.) and medium-level data access methods (a simple data abstraction layer for FITS files). It also provides table organization and manipulation, keyword/value handling and management, and support for dynamic loading of recipe modules using programs such as EsoRex (ascl:1504.003).

  3. Supporting the STEM Pipeline: Linking Applied STEM Course-Taking in High School to Declaring a STEM Major in College

    Science.gov (United States)

    Gottfried, Michael A.; Bozick, Robert

    2016-01-01

    Recently, through the support from the Obama administration, the traditional STEM curricula (science, technology, engineering, and mathematics) in high schools are being updated with integrated, applied STEM courses (e.g., technology and engineering) in order to enhance the "real world" applicability of scientific fields and ultimately…

  4. Removable pipeline plug

    International Nuclear Information System (INIS)

    Vassalotti, M.; Anastasi, F.

    1984-01-01

    A removable plugging device for a pipeline, and particularly for pressure testing a steam pipeline in a boiling water reactor, wherein an inflatable annular sealing member seals off the pipeline and characterized by radially movable shoes for holding the plug in place, each shoe being pivotally mounted for self-adjusting engagement with even an out-of-round pipeline interior

  5. Underground pipeline corrosion

    CERN Document Server

    Orazem, Mark

    2014-01-01

    Underground pipelines transporting liquid petroleum products and natural gas are critical components of civil infrastructure, making corrosion prevention an essential part of asset-protection strategy. Underground Pipeline Corrosion provides a basic understanding of the problems associated with corrosion detection and mitigation, and of the state of the art in corrosion prevention. The topics covered in part one include: basic principles for corrosion in underground pipelines, AC-induced corrosion of underground pipelines, significance of corrosion in onshore oil and gas pipelines, n

  6. 49 CFR 192.755 - Protecting cast-iron pipelines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Protecting cast-iron pipelines. 192.755 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance § 192.755 Protecting cast-iron pipelines. When an operator has knowledge that the support for a segment of a buried cast-iron...

  7. North America pipeline map

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    This map presents details of pipelines currently in place throughout North America. Fifty-nine natural gas pipelines are presented, as well as 16 oil pipelines. The map also identifies six proposed natural gas pipelines. Major cities, roads and highways are included as well as state and provincial boundaries. The National Petroleum Reserve is identified, as well as the Arctic National Wildlife Refuge. The following companies placed advertisements on the map with details of the services they provide relating to pipeline management and construction: Ferus Gas Industries Trust; Proline; SulfaTreat Direct Oxidation; and TransGas. 1 map

  8. Pipeline integrity: ILI baseline data for QRA

    Energy Technology Data Exchange (ETDEWEB)

    Porter, Todd R. [Tuboscope Pipeline Services, Houston, TX (United States)]. E-mail: tporter@varco.com; Silva, Jose Augusto Pereira da [Pipeway Engenharia, Rio de Janeiro, RJ (Brazil)]. E-mail: guto@pipeway.com; Marr, James [MARR and Associates, Calgary, AB (Canada)]. E-mail: jmarr@marr-associates.com

    2003-07-01

    The initial phase of a pipeline integrity management program (IMP) is conducting a baseline assessment of the pipeline system and segments as part of Quantitative Risk Assessment (QRA). This gives the operator's integrity team the opportunity to identify critical areas and deficiencies in the protection, maintenance, and mitigation strategies. As a part of data gathering and integration of a wide variety of sources, in-line inspection (ILI) data is a key element. In order to move forward in the integrity program development and execution, the baseline geometry of the pipeline must be determined with accuracy and confidence. From this, all subsequent analysis and conclusions will be derived. Tuboscope Pipeline Services (TPS), in conjunction with Pipeway Engenharia of Brazil, operate ILI inertial navigation system (INS) and Caliper geometry tools, to address this integrity requirement. This INS and Caliper ILI tool data provides pipeline trajectory at centimeter level resolution and sub-metre 3D position accuracy along with internal geometry - ovality, dents, misalignment, and wrinkle/buckle characterization. Global strain can be derived from precise INS curvature measurements and departure from the initial pipeline state. Accurate pipeline elevation profile data is essential in the identification of sag/over bend sections for fluid dynamic and hydrostatic calculations. This data, along with pipeline construction, operations, direct assessment and maintenance data is integrated in LinaViewPRO{sup TM}, a pipeline data management system for decision support functions, and subsequent QRA operations. This technology provides the baseline for an informed, accurate and confident integrity management program. This paper/presentation will detail these aspects of an effective IMP, and experience will be presented, showing the benefits for liquid and gas pipeline systems. (author)

  9. Customer service drives pipelines' reorganization

    International Nuclear Information System (INIS)

    Share, J.

    1997-01-01

    The concept behind formation of Enron Transportation and Storage tells plenty about this new gas industry. When executives at the Enron Gas Pipeline Group considered plans last year to streamline operations by merging the support functions of Transwestern Pipeline and their other wholly owned pipeline company, Northern Natural Gas, seamless customer service was foremost on their agenda. Instead of worrying about whether employees would favor one pipeline over the other, perhaps to the detriment of customers, they simply created a new organization that everyone would swear the same allegiance to. The 17,000-mile, 4.1 Bcf/d Northern system serves the upper Midwest market and two major expansion projects were completed there last year. Transwestern is a 2,700-mile system with an eastward capacity of 1 Bcf/d and westward of 1.5 Bcf/, that traditionally served California markets. It also ties into Texas intrastate markets and, thanks to expansion of the San Juan lateral, to southern Rocky Mountain supplies. Although Enron Corp. continues to position itself as a full-service energy company, the Gas Pipeline Group continues to fuel much of corporate's net income, which was $584 million last year. With ET and S comprising a significant portion of GPG's income, it was vital that the merger of Northern's 950 employees with Transwestern's 250 indeed be a seamless one. It was not easy either psychologically or geographically with main offices in Omaha, NE and Houston as well as operations centers in Minneapolis, MN; Amarillo, TX; W. Des Moines, IA; and Albuquerque, NM. But the results have been gratifying, according to William R. Cordes, President of ET and S and Nancy L. Gardner, Executive Vice President of Strategic Initiatives

  10. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  11. Military Petroleum Pipeline Systems

    Science.gov (United States)

    1978-06-01

    Army has standardized for this purpose. A tactical pipeline system, may be temporary or semilpermanenit and isemnplaced rapidly to maintain the Ipip ...with operating pressure. IPip is the1 highest cost Item In a pipeline system, normally representing more than half the total jinvest- ment in materiel

  12. Slurry pipeline hydrostatic testing

    Energy Technology Data Exchange (ETDEWEB)

    Betinol, Roy G.; Navarro Rojas, Luis Alejandro [BRASS Chile S.A., Santiago (Chile)

    2009-07-01

    The transportation of concentrates and tailings through long distance pipeline has been proven in recent years to be the most economic, environmentally friendly and secure means of transporting of mine products. This success has led to an increase in the demand for long distance pipeline throughout the mining industry. In year 2007 alone, a total of over 500 km of pipeline has been installed in South America alone and over 800 km are in the planning stages. As more pipelines are being installed, the need to ensure its operating integrity is ever increasing. Hydrostatic testing of long distance pipeline is one of the most economical and expeditious way to proving the operational integrity of the pipe. The intent of this paper is to show the sound reasoning behind construction hydro testing and the economic benefit it presents. It will show how hydro test pressures are determined based on ASME B31.11 criteria. (author)

  13. Slurry pipeline design approach

    Energy Technology Data Exchange (ETDEWEB)

    Betinol, Roy; Navarro R, Luis [Brass Chile S.A., Santiago (Chile)

    2009-12-19

    Compared to other engineering technologies, the design of a commercial long distance Slurry Pipeline design is a relatively new engineering concept which gained more recognition in the mid 1960 's. Slurry pipeline was first introduced to reduce cost in transporting coal to power generating units. Since then this technology has caught-up worldwide to transport other minerals such as limestone, copper, zinc and iron. In South America, the use of pipeline is commonly practiced in the transport of Copper (Chile, Peru and Argentina), Iron (Chile and Brazil), Zinc (Peru) and Bauxite (Brazil). As more mining operations expand and new mine facilities are opened, the design of the long distance slurry pipeline will continuously present a commercially viable option. The intent of this paper is to present the design process and discuss any new techniques and approach used today to ensure a better, safer and economical slurry pipeline. (author)

  14. Pollution from pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    During the 1980s, over 3,900 spills from land-based pipelines released nearly 20 million gallons of oil into U.S. waters-almost twice as much as was released by the March 1989 Exxon Valdez oil spill. Although the Department of Transportation is responsible for preventing water pollution from petroleum pipelines, GAO found that it has not established a program to prevent such pollution. DOT has instead delegated this responsibility to the Coast Guard, which has a program to stop water pollution from ships, but not from pipelines. This paper reports that, in the absence of any federal program to prevent water pollution from pipelines, both the Coast Guard and the Environmental Protection Agency have taken steps to plan for and respond to oil spills, including those from pipelines, as required by the Clean Water Act. The Coast Guard cannot, however, adequately plan for or ensure a timely response to pipeline spills because it generally is unaware of specific locations and operators of pipelines

  15. Addressing the workforce pipeline challenge

    Energy Technology Data Exchange (ETDEWEB)

    Leonard Bond; Kevin Kostelnik; Richard Holman

    2006-11-01

    A secure and affordable energy supply is essential for achieving U.S. national security, in continuing U.S. prosperity and in laying the foundations to enable future economic growth. To meet this goal the next generation energy workforce in the U.S., in particular those needed to support instrumentation, controls and advanced operations and maintenance, is a critical element. The workforce is aging and a new workforce pipeline, to support both current generation and new build has yet to be established. The paper reviews the challenges and some actions being taken to address this need.

  16. 77 FR 19799 - Pipeline Safety: Pipeline Damage Prevention Programs

    Science.gov (United States)

    2012-04-02

    ... rates translate to increased public and worker safety and decreased repair and outage costs for pipeline... April 2, 2012 Part III Department of Transportation Pipeline and Hazardous Materials Safety Administration 49 CFR Parts 196 and 198 Pipeline Safety: Pipeline Damage Prevention Programs; Proposed Rule #0;#0...

  17. High temperature pipeline design

    Energy Technology Data Exchange (ETDEWEB)

    Greenslade, J.G. [Colt Engineering, Calgary, AB (Canada). Pipelines Dept.; Nixon, J.F. [Nixon Geotech Ltd., Calgary, AB (Canada); Dyck, D.W. [Stress Tech Engineering Inc., Calgary, AB (Canada)

    2004-07-01

    It is impractical to transport bitumen and heavy oil by pipelines at ambient temperature unless diluents are added to reduce the viscosity. A diluted bitumen pipeline is commonly referred to as a dilbit pipeline. The diluent routinely used is natural gas condensate. Since natural gas condensate is limited in supply, it must be recovered and reused at high cost. This paper presented an alternative to the use of diluent to reduce the viscosity of heavy oil or bitumen. The following two basic design issues for a hot bitumen (hotbit) pipeline were presented: (1) modelling the restart problem, and, (2) establishing the maximum practical operating temperature. The transient behaviour during restart of a high temperature pipeline carrying viscous fluids was modelled using the concept of flow capacity. Although the design conditions were hypothetical, they could be encountered in the Athabasca oilsands. It was shown that environmental disturbances occur when the fluid is cooled during shut down because the ground temperature near the pipeline rises. This can change growing conditions, even near deeply buried insulated pipelines. Axial thermal loads also constrain the design and operation of a buried pipeline as higher operating temperatures are considered. As such, strain based design provides the opportunity to design for higher operating temperature than allowable stress based design methods. Expansion loops can partially relieve the thermal stress at a given temperature. As the design temperature increase, there is a point at which above grade pipelines become attractive options, although the materials and welding procedures must be suitable for low temperature service. 3 refs., 1 tab., 10 figs.

  18. Pipeline for Contraceptive Development

    Science.gov (United States)

    Blithe, Diana L.

    2016-01-01

    The high rates of unplanned pregnancy reflect unmet need for effective contraceptive methods for women, especially for individuals with health risks such as obesity, diabetes, hypertension, and other conditions that may contraindicate use of an estrogen-containing product. Improvements in safety, user convenience, acceptability and availability of products remain important goals of the contraceptive development program. Another important goal is to minimize the impact of the products on the environment. Development of new methods for male contraception has the potential to address many of these issues with regard to safety for women who have contraindications to effective contraceptive methods but want to protect against pregnancy. It also will address a huge unmet need for men who want to control their fertility. Products under development for men would not introduce eco-toxic hormones in the waste water. Investment in contraceptive research to identify new products for women has been limited in the pharmaceutical industry relative to investment in drug development for other indications. Pharmaceutical R&D for male contraception was active in the 1990’s but was abandoned over a decade ago. The Eunice Kennedy Shriver National Institute of Child Health and Human Development (NICHD) has supported a contraceptive development program since 1969. Through a variety of programs including research grants and contracts, NICHD has developed a pipeline of new targets/products for male and female contraception. A number of lead candidates are under evaluation in the NICHD Contraceptive Clinical Trials Network (CCTN) (1–3). PMID:27523300

  19. Natural Gas Liquid Pipelines

    Data.gov (United States)

    Department of Homeland Security — Natural gas interstate and intrastate pipelines in the United States. Based on a variety of sources with varying scales and levels of accuracy and therefore accuracy...

  20. Common Data Analysis Pipeline | Office of Cancer Clinical Proteomics Research

    Science.gov (United States)

    CPTAC supports analyses of the mass spectrometry raw data (mapping of spectra to peptide sequences and protein identification) for the public using a Common Data Analysis Pipeline (CDAP). The data types available on the public portal are described below. A general overview of this pipeline can be downloaded here. Mass Spectrometry Data Formats RAW (Vendor) Format

  1. 77 FR 26822 - Pipeline Safety: Verification of Records

    Science.gov (United States)

    2012-05-07

    ... history of the segment, particularly known corrosion and the actual operating ] pressure. The third method... determine whether they are adequate to support operating parameters and conditions on their pipeline systems... pipeline facilities to verify their records relating to operating specifications for maximum allowable...

  2. 77 FR 19414 - Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline Safety...

    Science.gov (United States)

    2012-03-30

    ... PHMSA-2012-0021] Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline... public, and the environment. The deliverable from this study will embody the supporting information... Safety Administration (PHMSA), DOT. ACTION: Notice of Public Comment. SUMMARY: The Department of...

  3. Protecting a pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Gray, D.H (Univ. of Michigan, Ann Arbor, MI (United States)); Garcia-Lopez, M. (Ingenieria y Geotecnia Ltda., Santafe de Bogota (Colombia))

    1994-12-01

    This article describes some of the difficulties in constructing an oil pipeline in Colombia across a forested mountain range that has erosion-prone slopes. Engineers are finding ways to protect the pipeline against slope failures and severe erosion problems while contending with threats of guerrilla attacks. Torrential rainfall, precipitous slopes, unstable soils, unfavorable geology and difficult access make construction of an oil pipeline in Colombia a formidable undertaking. Add the threat of guerrilla attacks, and the project takes on a new dimension. In the country's central uplands, a 76 cm pipeline traverses some of the most daunting and formidable terrain in the world. The right-of-way crosses rugged mountains with vertical elevations ranging from 300 m to 2,000 mm above sea level over a distance of some 30 km. The pipeline snakes up and down steep forested inclines in some spots and crosses streams and faults in others, carrying the country's major export--petroleum--from the Cusiana oil field, located in Colombia's lowland interior, to the coast.

  4. 76 FR 29333 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Science.gov (United States)

    2011-05-20

    ... pipeline rehabilitation, replacement and repair initiatives along with all forum-related comments. PHMSA... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY...

  5. Northern pipelines : backgrounder

    International Nuclear Information System (INIS)

    2002-04-01

    Most analysts agree that demand for natural gas in North America will continue to grow. Favourable market conditions created by rising demand and declining production have sparked renewed interest in northern natural gas development. The 2002 Annual Energy Outlook forecasted U.S. consumption to increase at an annual average rate of 2 per cent from 22.8 trillion cubic feet to 33.8 TCF by 2020, mostly due to rapid growth in demand for electric power generation. Natural gas prices are also expected to increase at an annual average rate of 1.6 per cent, reaching $3.26 per thousand cubic feet in 2020. There are currently 3 proposals for pipelines to move northern gas to US markets. They include a stand-alone Mackenzie Delta Project, the Alaska Highway Pipeline Project, and an offshore route that would combine Alaskan and Canadian gas in a pipeline across the floor of the Beaufort Sea. Current market conditions and demand suggest that the projects are not mutually exclusive, but complimentary. The factors that differentiate northern pipeline proposals are reserves, preparedness for market, costs, engineering, and environmental differences. Canada has affirmed its role to provide the regulatory and fiscal certainty needed by industry to make investment decisions. The Government of the Yukon does not believe that the Alaska Highway Project will shut in Mackenzie Delta gas, but will instead pave the way for development of a new northern natural gas industry. The Alaska Highway Pipeline Project will bring significant benefits for the Yukon, the Northwest Territories and the rest of Canada. Unresolved land claims are one of the challenges that has to be addressed for both Yukon and the Northwest Territories, as the proposed Alaska Highway Pipeline will travel through traditional territories of several Yukon first Nations. 1 tab., 4 figs

  6. Adapting the BIMA Image Pipeline for Miriad Using Python

    Science.gov (United States)

    Mehringer, D. M.; Plante, R.

    2004-07-01

    Through our experience using AIPS++ in the BIMA Image Pipeline, we found that a sophisticated scripting environment is crucial for supporting an automated pipeline. Miriad V4, now in development, introduces support for calling Miriad programs from a Python environment (referred to as Pyramid). We are creating processing recipes using Miriad through Python that can be used with the BIMA Image Pipeline. As part of this work, we are prototyping tools that could be integrated into Pyramid. These include two Python classes, UVDataset and Image for examining the contents of Miriad datasets. These simple tools have allowed us to recast our Pipeline using Miriad in only a couple of months. Python recipes are used for such things as determining line-free channels for continuum subtraction and determining if data will benefit from self-calibration. We are currently using the Pipeline to do massive processing of hundreds of tracks of archival data using NCSA's Teraflop IA-32 Linux cluster.

  7. Women Engineering Faculty: Expanding the Pipeline

    Science.gov (United States)

    Greni, Nadene Deiterman

    2006-01-01

    The purpose for this case study was to explore the features of undergraduate engineering departmental and college support that influenced the persistence of women students. Women engineering faculty members were among the participants at three Land Grant universities in the Midwest. The data revealed the theme, Expanding the Pipeline, and…

  8. The Dark Energy Survey Image Processing Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Morganson, E.; et al.

    2018-01-09

    The Dark Energy Survey (DES) is a five-year optical imaging campaign with the goal of understanding the origin of cosmic acceleration. DES performs a 5000 square degree survey of the southern sky in five optical bands (g,r,i,z,Y) to a depth of ~24th magnitude. Contemporaneously, DES performs a deep, time-domain survey in four optical bands (g,r,i,z) over 27 square degrees. DES exposures are processed nightly with an evolving data reduction pipeline and evaluated for image quality to determine if they need to be retaken. Difference imaging and transient source detection are also performed in the time domain component nightly. On a bi-annual basis, DES exposures are reprocessed with a refined pipeline and coadded to maximize imaging depth. Here we describe the DES image processing pipeline in support of DES science, as a reference for users of archival DES data, and as a guide for future astronomical surveys.

  9. Diagnosing in building main pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Telegin, L.G.; Gorelov, A.S.; Kurepin, B.N.; Orekhov, V.I.; Vasil' yev, G.G.; Yakovlev, Ye. I.

    1984-01-01

    General principles are examined for technical diagnosis in building main pipelines. A technique is presented for diagnosis during construction, as well as diagnosis of the technical state of the pipeline-construction machines and mechanisms. The survey materials could be used to set up construction of main pipelines.

  10. APV6 Pipeline Emulations

    CERN Document Server

    Millmore, Martin

    1997-01-01

    The data volume from the CMS inner tracker is large enough that data cannot be read out for every bunch crossing, so data are stored in the front end readout chips until a first level trigger signal is received, after which the interesting data are read out. This will reduce the data rate from 40 MHz to 100 kHz. For the silicon microstrips, the data are read out using the APV6 chip which holds the data in an analogue pipeline for up to 3.2 us. Up to 6 events may be stored in the pipeline at any one time, and data are read out asynchronously. In any system where data arrives with a random distribution in time, a finite sized memory can become full, causing data to be lost. Because of the complex nature of the APV6 pipeline logic, a true estimate of the proportion of data which will be lost can only be achieved by running a computer emulation of the pipeline logic, with a poisson distribu tion of trigger signals. The emulation has also been modified to study the effect of other possible logic designs.

  11. Improving Graduate Education to Support a Branching Career Pipeline: Recommendations Based on a Survey of Doctoral Students in the Basic Biomedical Sciences

    Science.gov (United States)

    Fuhrmann, C. N.; Halme, D. G.; O'Sullivan, P. S.; Lindstaedt, B.

    2011-01-01

    Today's doctoral programs continue to prepare students for a traditional academic career path despite the inadequate supply of research-focused faculty positions. We advocate for a broader doctoral curriculum that prepares trainees for a wide range of science-related career paths. In support of this argument, we describe data from our survey of…

  12. A computational genomics pipeline for prokaryotic sequencing projects.

    Science.gov (United States)

    Kislyuk, Andrey O; Katz, Lee S; Agrawal, Sonia; Hagen, Matthew S; Conley, Andrew B; Jayaraman, Pushkala; Nelakuditi, Viswateja; Humphrey, Jay C; Sammons, Scott A; Govil, Dhwani; Mair, Raydel D; Tatti, Kathleen M; Tondella, Maria L; Harcourt, Brian H; Mayer, Leonard W; Jordan, I King

    2010-08-01

    New sequencing technologies have accelerated research on prokaryotic genomes and have made genome sequencing operations outside major genome sequencing centers routine. However, no off-the-shelf solution exists for the combined assembly, gene prediction, genome annotation and data presentation necessary to interpret sequencing data. The resulting requirement to invest significant resources into custom informatics support for genome sequencing projects remains a major impediment to the accessibility of high-throughput sequence data. We present a self-contained, automated high-throughput open source genome sequencing and computational genomics pipeline suitable for prokaryotic sequencing projects. The pipeline has been used at the Georgia Institute of Technology and the Centers for Disease Control and Prevention for the analysis of Neisseria meningitidis and Bordetella bronchiseptica genomes. The pipeline is capable of enhanced or manually assisted reference-based assembly using multiple assemblers and modes; gene predictor combining; and functional annotation of genes and gene products. Because every component of the pipeline is executed on a local machine with no need to access resources over the Internet, the pipeline is suitable for projects of a sensitive nature. Annotation of virulence-related features makes the pipeline particularly useful for projects working with pathogenic prokaryotes. The pipeline is licensed under the open-source GNU General Public License and available at the Georgia Tech Neisseria Base (http://nbase.biology.gatech.edu/). The pipeline is implemented with a combination of Perl, Bourne Shell and MySQL and is compatible with Linux and other Unix systems.

  13. Instrumented Pipeline Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Piro; Michael Ream

    2010-07-31

    This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

  14. Pipeline network and environment

    International Nuclear Information System (INIS)

    Oliveira Nascimento, I.; Wagner, J.; Silveira, T.

    2012-01-01

    The Rio de Janeiro is one of 27 units of Brazil. It is located in the eastern portion of the Southeast and occupies an area of 43 696.054 km², being effectively the 3rd smallest state in Brazil. This state in recent years has suffered from erosion problems caused by the deployment of the network pipeline. The deployment pipeline is part of the activities related to the oil industry has caused a more intense conflict between the environment and economic activities, modifying the soil structure and distribution of surface and subsurface flows. This study aimed to analyze the erosion caused by the removal of soil for the deployment of pipeline transportation, with the consequences of the emergence of numerous gullies, landslides and silting of rivers. For the development of this study were performed bibliographic research, field work, mapping and digital preparation of the initial diagnosis of active processes and what the consequent environmental impacts. For these reasons, we conclude that the problems could be avoided or mitigated if there was a prior geological risk management. (author)

  15. United States petroleum pipelines: An empirical analysis of pipeline sizing

    Science.gov (United States)

    Coburn, L. L.

    1980-12-01

    The undersizing theory hypothesizes that integrated oil companies have a strong economic incentive to size the petroleum pipelines they own and ship over in a way that means that some of the demand must utilize higher cost alternatives. The DOJ theory posits that excess or monopoly profits are earned due to the natural monopoly characteristics of petroleum pipelines and the existence of market power in some pipelines at either the upstream or downstream market. The theory holds that independent petroleum pipelines owned by companies not otherwise affiliated with the petroleum industry (independent pipelines) do not have these incentives and all the efficiencies of pipeline transportation are passed to the ultimate consumer. Integrated oil companies on the other hand, keep these cost efficiencies for themselves in the form of excess profits.

  16. iUTAH Summer Research Institutes: Supporting the STEM Pipeline Through Engagement of High School, Undergraduate and Graduate Students, Secondary Teachers, and University Faculty in Authentic, Joint Research Experiences

    Science.gov (United States)

    Stark, L. A.; Malone, M.

    2015-12-01

    Multiple types of programs are needed to support the STEM workforce pipeline from pre-college through graduate school and beyond. Short-term, intensive programs provide opportunities to participate in authentic scientific research for students who may not be sure of their interest in science and for teachers who may be unable to devote an entire summer to a research experience. The iUTAH (innovative Urban Transitions and Aridregion Hydro-Systainability) Summer Research Institute utilizes an innovative approach for a 5-day program that engages high school and undergraduate students as well as middle and high school teachers in conducting research projects led by graduate students and faculty members. Each Institute involves 3-4 half to full-day research projects. Participants collect (usually in the field) and analyze data for use in on-going research or that is related to a current research project. The participants work in groups with the graduate students to create a poster about each research project. They present their posters on the last day of the Institute at the state-wide meeting of all researchers and involved in this EPSCoR-funded program. In addition to introducing participants to research, one of the Institute's goals is to provide opportunities for meaningful near-peer interactions with students along the STEM pipeline from high school to undergraduate to graduate school. On the end-of-Institute evaluations, almost all students have reported that their discussions with other participants and with graduate students and faculty were a "Highly effective" or "Effective" part of the Institute. In response to a question about how the Institute will impact their course choices or their plans to pursue a career in science, many high school and undergraduate students have noted that they plan to take more science courses. Each year several undergraduates who were previously unsure about a career in science have indicated that they now intend to pursue a

  17. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  18. Pipeline integrity : control by coatings

    Energy Technology Data Exchange (ETDEWEB)

    Khanna, A.S. [Indian Inst. of Technology, Bombay (India)

    2008-07-01

    This presentation provided background information on the history of cross-country pipelines in India. It discussed the major use of gas. The key users were described as being the power and fertilizer industries, followed by vehicles using compressed natural gas to replace liquid fuels and thereby reduce pollution. The presentation also addressed the integrity of pipelines in terms of high production, safety, and monitoring. Integrity issues of pipelines were discussed with reference to basic design, control of corrosion, and periodic health monitoring. Other topics that were outlined included integrity by corrosion control; integrity by health monitoring; coatings requirements; classification of UCC pipeline coatings; and how the pipeline integrity approach can help to achieve coatings which give design life without any failure. Surface cleanliness, coating conditions, and the relationship between temperature of Epoxy coating and the time of adhesive coating were also discussed. Last, the presentation provided the results of an audit of the HBJ pipeline conducted from 1999 to 2000. tabs., figs.

  19. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  20. 49 CFR 195.210 - Pipeline location.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline location. 195.210 Section 195.210 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.210 Pipeline location. (a) Pipeline right-of-way must be selected to avoid, as...

  1. Slurry pipeline technology: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Jay P. [Pipeline Systems Incorporated (PSI), Belo Horizonte, MG (Brazil); Lima, Rafael; Pinto, Daniel; Vidal, Alisson [Ausenco do Brasil Engenharia Ltda., Nova Lima, MG (Brazil). PSI Div.

    2009-12-19

    Slurry pipelines represent an economical and environmentally friendly transportation means for many solid materials. This paper provides an over-view of the technology, its evolution and current Brazilian activity. Mineral resources are increasingly moving farther away from ports, processing plants and end use points, and slurry pipelines are an important mode of solids transport. Application guidelines are discussed. State-of-the-Art technical solutions such as pipeline system simulation, pipe materials, pumps, valves, automation, telecommunications, and construction techniques that have made the technology successful are presented. A discussion of where long distant slurry pipelines fit in a picture that also includes thickened and paste materials pipe lining is included. (author)

  2. INTERNAL REPAIR OF PIPELINES

    Energy Technology Data Exchange (ETDEWEB)

    Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

    2005-07-20

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without

  3. Pipeline dynamics subject to restraints with clearance

    International Nuclear Information System (INIS)

    Loula, A.F.D.; Guerreiro, J.N.C.

    1980-12-01

    The principle of virtual works at its incremental form, is utilized for the formulation of flat pipeline vibration problems, of elastic-plastic behavior, submitted to restraints with clearance (also with elastic-plastic behavior) and with viscous damping. The possibility of uniform movement of the support, that simulates the seismic action is also considered. The finite element method and an integration time algorithm, are utilized for the problem resolution. Some examples ilustrate the application of the development program. (Author) [pt

  4. Advances in riser and pipeline technologies

    Energy Technology Data Exchange (ETDEWEB)

    Kan, Wan C.; Mortazavi, Mehrdad; Weir, Michael S. [ExxonMobil Development Company, Dallas, TX (United States)

    2009-12-19

    As oil and gas production continues to move into new frontier areas, novel applications of the existing riser and pipeline technologies need to be developed to meet the often more stringent requirements encountered in these environments. The challenges include ultra deep water, harsh environments, aggressive fluid conditions, and local content objectives, etc. They will require industry to constantly extend, expand, and enhance the broad range of solution options. Also, the existing design criteria in industry may need to be revised or new criteria may need to be developed to satisfy these needs. Exxon Mobil (Em) employs, and works with others in industry to promote robust design and operating practices. This approach requires in-depth understanding, sound engineering principles, advanced analysis, uncertainty management, and supportive qualification test data. It enables confident selection, extrapolation, and innovation of technologies to address new riser system and pipeline challenges. Focus on fundamental is imperative to ensure integrity of the selected systems during fabrication, installation, and operation phases. Recent and past project experience in deep water Gulf of Mexico and West Africa provides many successful examples of this approach. This paper reviews several examples of the key riser system and pipeline technology enhancements recently achieved by EM to provide confidence in addressing technical and project application challenges. Riser system technology enhancements addressed in this paper include steel catenary riser (SCR) application on turret-moored FPSO with severe motions, pipe-in-pipe (PIP) hybrid production riser to effectively manage gas lift and flow assurance requirements, irregular wave analysis methodology for flexible risers and umbilicals to reduce conservatism, and qualification of riser and pipeline VIV prediction and mitigation methods. Pipeline technology enhancements detailed in this paper include lateral buckling prediction

  5. Data processing pipeline for Herschel HIFI

    Science.gov (United States)

    Shipman, R. F.; Beaulieu, S. F.; Teyssier, D.; Morris, P.; Rengel, M.; McCoey, C.; Edwards, K.; Kester, D.; Lorenzani, A.; Coeur-Joly, O.; Melchior, M.; Xie, J.; Sanchez, E.; Zaal, P.; Avruch, I.; Borys, C.; Braine, J.; Comito, C.; Delforge, B.; Herpin, F.; Hoac, A.; Kwon, W.; Lord, S. D.; Marston, A.; Mueller, M.; Olberg, M.; Ossenkopf, V.; Puga, E.; Akyilmaz-Yabaci, M.

    2017-12-01

    Context. The HIFI instrument on the Herschel Space Observatory performed over 9100 astronomical observations, almost 900 of which were calibration observations in the course of the nearly four-year Herschel mission. The data from each observation had to be converted from raw telemetry into calibrated products and were included in the Herschel Science Archive. Aims: The HIFI pipeline was designed to provide robust conversion from raw telemetry into calibrated data throughout all phases of the HIFI missions. Pre-launch laboratory testing was supported as were routine mission operations. Methods: A modular software design allowed components to be easily added, removed, amended and/or extended as the understanding of the HIFI data developed during and after mission operations. Results: The HIFI pipeline processed data from all HIFI observing modes within the Herschel automated processing environment as well as within an interactive environment. The same software can be used by the general astronomical community to reprocess any standard HIFI observation. The pipeline also recorded the consistency of processing results and provided automated quality reports. Many pipeline modules were in use since the HIFI pre-launch instrument level testing. Conclusions: Processing in steps facilitated data analysis to discover and address instrument artefacts and uncertainties. The availability of the same pipeline components from pre-launch throughout the mission made for well-understood, tested, and stable processing. A smooth transition from one phase to the next significantly enhanced processing reliability and robustness. Herschel was an ESA space observatory with science instruments provided by European-led Principal Investigator consortia and with important participation from NASA.

  6. Using industry ROV videos to assess fish associations with subsea pipelines

    Science.gov (United States)

    McLean, D. L.; Partridge, J. C.; Bond, T.; Birt, M. J.; Bornt, K. R.; Langlois, T. J.

    2017-06-01

    Remote Operated Vehicles are routinely used to undertake inspection and maintenance activities of underwater pipelines in north-west Australia. In doing so, many terabytes of geo-referenced underwater video are collected at depths, and on a scale usually unobtainable for ecological research. We assessed fish diversity and abundance from existing ROV videos collected along 2-3 km sections of two pipelines in north-west Australia, one at 60-80 m water depth and the other at 120-130 m. A total of 5962 individual fish from 92 species and 42 families were observed. Both pipelines were characterised by a high abundance of commercially important fishes including: snappers (Lutjanidae) and groupers (Epinephelidae). The presence of thousands of unidentifiable larval fish, in addition to juveniles, sub-adults and adults suggests that the pipelines may be enhancing, rather than simply attracting, fish stocks. The prevalence and high complexity of sponges on the shallower pipeline and of deepwater corals on the deeper pipeline had a strong positive correlation with the fish abundance. These habitats likely offer a significant food source and refuge for fish, but also for invertebrates upon which fish feed. A greater diversity on the shallower pipeline, and a higher abundance of fishes on both pipelines, were associated with unsupported pipeline sections (spans) and many species appeared to be utilising pipeline spans as refuges. This study is a first look at the potential value of subsea pipelines for fishes on the north-west shelf. While the results suggest that these sections of pipeline appear to offer significant habitat that supports diverse and important commercially fished species, further work, including off-pipeline surveys on the natural seafloor, are required to determine conclusively the ecological value of pipelines and thereby inform discussions regarding the ecological implications of pipeline decommissioning.

  7. Learning the image processing pipeline.

    Science.gov (United States)

    Jiang, Haomiao; Tian, Qiyuan; Farrell, Joyce; Wandell, Brian

    2017-06-08

    Many creative ideas are being proposed for image sensor designs, and these may be useful in applications ranging from consumer photography to computer vision. To understand and evaluate each new design, we must create a corresponding image processing pipeline that transforms the sensor data into a form that is appropriate for the application. The need to design and optimize these pipelines is time-consuming and costly. We explain a method that combines machine learning and image systems simulation that automates the pipeline design. The approach is based on a new way of thinking of the image processing pipeline as a large collection of local linear filters. We illustrate how the method has been used to design pipelines for novel sensor architectures in consumer photography applications.

  8. Long-distance fiber optic sensing solutions for pipeline leakage, intrusion, and ground movement detection

    Science.gov (United States)

    Nikles, Marc

    2009-05-01

    An increasing number of pipelines are constructed in remote regions affected by harsh environmental conditions where pipeline routes often cross mountain areas which are characterized by unstable grounds and where soil texture changes between winter and summer increase the probability of hazards. Third party intentional interference or accidental intrusions are a major cause of pipeline failures leading to large leaks or even explosions. Due to the long distances to be monitored and the linear nature of pipelines, distributed fiber optic sensing techniques offer significant advantages and the capability to detect and localize pipeline disturbance with great precision. Furthermore pipeline owner/operators lay fiber optic cable parallel to transmission pipelines for telecommunication purposes and at minimum additional cost monitoring capabilities can be added to the communication system. The Brillouin-based Omnisens DITEST monitoring system has been used in several long distance pipeline projects. The technique is capable of measuring strain and temperature over 100's kilometers with meter spatial resolution. Dedicated fiber optic cables have been developed for continuous strain and temperature monitoring and their deployment along the pipeline has enabled permanent and continuous pipeline ground movement, intrusion and leak detection. This paper presents a description of the fiber optic Brillouin-based DITEST sensing technique, its measurement performance and limits, while addressing future perspectives for pipeline monitoring. The description is supported by case studies and illustrated by field data.

  9. Challenges in the development of market-based pipeline investments

    International Nuclear Information System (INIS)

    Von Bassenheim, G.; Mohitpour, M.; Klaudt, D.; Jenkins, A.

    2000-01-01

    The challenges, risks and uncertainties that the natural gas industry faces in developing market-based pipeline projects were discussed. Market-based pipeline investments are fundamentally different from user-driven projects. Market-based projected involve finding enough energy users and linking them with a pipeline infrastructure to viable supplies of natural gas. Each unique project is developed individually and requires a strong corporate vision and support before it can be successfully implemented. The three phases of a pipeline investment include the business development phase, the project development phase, and the implementation/operations phase. Market-based companies will need a clear vision for long-term goals and the desire to succeed. The company will have to prepare a detailed strategy and policies that clearly define geographic areas of operations, risk tolerance, availability of capital and expected project performance. 3 refs., 3 tabs., 2 figs

  10. INTERNAL REPAIR OF PIPELINES

    Energy Technology Data Exchange (ETDEWEB)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-12-31

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without

  11. Shipping Information Pipeline

    DEFF Research Database (Denmark)

    Jensen, Thomas; Vatrapu, Ravi

    2015-01-01

    systems researchers engaged in the design and development of a prototype for an innovative IT-artifact called Shipping Information Pipeline which is a kind of “an internet” for shipping information. The instrumental aim is to enable information seamlessly to cross the organizational boundaries......This paper presents a design science approach to solving persistent problems in the international shipping eco system by creating the missing common information infrastructures. Specifically, this paper reports on an ongoing dialogue between stakeholders in the shipping industry and information...... and national borders within international shipping which is a rather complex domain. The intellectual objective is to generate and evaluate the efficacy and effectiveness of design principles for inter-organizational information infrastructures in the international shipping domain that can have positive...

  12. INTERNAL REPAIR OF PIPELINES

    Energy Technology Data Exchange (ETDEWEB)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

    2004-04-12

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created

  13. INTERNAL REPAIR OF PIPELINES

    Energy Technology Data Exchange (ETDEWEB)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-08-17

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners

  14. Transformation pipelines for PROJ.4

    Science.gov (United States)

    Knudsen, Thomas; Evers, Kristian

    2017-04-01

    Convert the geographic coordinates to 3D cartesian geocentric coordinates Apply a Helmert transformation from ED50 to ETRS89 Convert back from cartesian to geographic coordinates Finally project the geographic coordinates to UTM zone 32 planar coordinates. The homology between these steps and a Unix shell style pipeline is evident. With this as its main architectural inspiration, the primary feature of our implementation is a pipeline driver, that takes as its user supplied arguments, a series of elementary operations, which it strings together in order to implement the full transformation needed. Also, we have added a number of elementary geodetic operations, including Helmert transformations, general high order polynomial shifts (2D Horner's scheme) and the abridged Molodensky transformation. In anticipation of upcoming support for full time-varying transformations, we also introduce a 4D spatiotemporal data type, and a programming interface (API) for handling this. With these improvements in place, we assert that PROJ.4 is now well on its way from being a mostly-map-projection library, to becoming an almost-generic-geodetic-transformation library.

  15. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Science.gov (United States)

    2010-03-19

    ... SUPPLEMENTARY INFORMATION for additional information. Privacy Act Statement: Anyone may search the electronic... patterns of similar findings. Poor construction quality has led to short and long term pipeline integrity...

  16. Natural gas pipeline technology overview.

    Energy Technology Data Exchange (ETDEWEB)

    Folga, S. M.; Decision and Information Sciences

    2007-11-01

    The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by

  17. Effort problem of chemical pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Okrajni, J.; Ciesla, M.; Mutwil, K. [Silesian Technical University, Katowice (Poland)

    1998-12-31

    The problem of the technical state assessment of the chemical pipelines working under mechanical and thermal loading has been shown in the paper. The pipelines effort after the long time operating period has been analysed. Material geometrical and loading conditions of the crack initiation and crack growth process in the chosen object has been discussed. Areas of the maximal effort have been determined. The material structure charges after the long time operating period have been described. Mechanisms of the crack initiation and crack growth in the pipeline elements have been analysed and mutual relations between the chemical and mechanical influences have been shown. (orig.) 16 refs.

  18. Subsea pipeline operational risk management

    Energy Technology Data Exchange (ETDEWEB)

    Bell, R.L.; Lanan, G.A.

    1996-12-31

    Resources used for inspection, maintenance, and repair of a subsea pipeline must be allocated efficiently in order to operate it in the most cost effective manner. Operational risk management aids in resource allocation through the use of risk assessments and cost/benefit analyses. It identifies those areas where attention must be focused in order to reduce risk. When they are identified, a company`s resources (i.e., personnel, equipment, money, and time) can then be used for inspection, maintenance, and/or repair of the pipeline. The results are cost effective risk reduction and pipeline operation with minimum expenditure.

  19. 49 CFR 195.422 - Pipeline repairs.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline repairs. 195.422 Section 195.422... PIPELINE Operation and Maintenance § 195.422 Pipeline repairs. (a) Each operator shall, in repairing its pipeline systems, insure that the repairs are made in a safe manner and are made so as to prevent damage to...

  20. Fishing intensity around the BBL pipeline

    NARCIS (Netherlands)

    Hintzen, Niels

    2016-01-01

    Wageningen Marine Research was requested by ACRB B.V. to investigate the fishing activities around the BBL pipeline. This gas pipeline crosses the southern North Sea from Balgzand (near Den Helder) in the Netherlands to Bacton in the UK (230km). This pipeline is abbreviated as the BBL pipeline. Part

  1. Crowded country: Gentry pipeline faces infrastructure web

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2003-12-01

    In order to support the growing potential production of leases, some Alberta oil and natural gas companies are obliged to pile their infrastructure on top of each other. To illustrate the overcrowding and the problems encountered by some of the companies, a case history describing the trials and tribulations of Gentry Resources, a Calgary-based junior company, is provided. The case history recalls that during the construction of a 11.2 km four-inch pipeline in the Princess/Tide Lake region to tie in their Princess Nisku gas well, the company had to cross 60 different existing pipelines and roads, including an abandoned rail bed. The greatest challenge in building the pipeline was getting the approval of each of many companies active in the region, not to mention the regulatory approvals which also included both environmental and historical assessments. Because of the combination of water and high carbon dioxide content of the gas, Gentry also had to install a dehydration plant to take water out of the gas train to avoid corrosion. Current production is about 2,000 boe/d; future growth in production is likely to be constrained because growth in gas production will strain the existing infrastructure, and space for adding more infrastructure is not available.

  2. Logistics aspects of petroleum pipeline operations

    Directory of Open Access Journals (Sweden)

    W. J. Pienaar

    2010-11-01

    Full Text Available The paper identifies, assesses and describes the logistics aspects of the commercial operation of petroleum pipelines. The nature of petroleum-product supply chains, in which pipelines play a role, is outlined and the types of petroleum pipeline systems are described. An outline is presented of the nature of the logistics activities of petroleum pipeline operations. The reasons for the cost efficiency of petroleum pipeline operations are given. The relative modal service effectiveness of petroleum pipeline transport, based on the most pertinent service performance measures, is offered. The segments in the petroleum-products supply chain where pipelines can play an efficient and effective role are identified.

  3. Pipeline integrity handbook risk management and evaluation

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Based on over 40 years of experience in the field, Ramesh Singh goes beyond corrosion control, providing techniques for addressing present and future integrity issues. Pipeline Integrity Handbook provides pipeline engineers with the tools to evaluate and inspect pipelines, safeguard the life cycle of their pipeline asset and ensure that they are optimizing delivery and capability. Presented in easy-to-use, step-by-step order, Pipeline Integrity Handbook is a quick reference for day-to-day use in identifying key pipeline degradation mechanisms and threats to pipeline integrity. The book begins

  4. Pipelines programming paradigms: Prefab plumbing

    International Nuclear Information System (INIS)

    Boeheim, C.

    1991-08-01

    Mastery of CMS Pipelines is a process of learning increasingly sophisticated tools and techniques that can be applied to your problem. This paper presents a compilation of techniques that can be used as a reference for solving similar problems

  5. Deliverability on the interstate natural gas pipeline system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Deliverability on the Interstate Natural Gas Pipeline System examines the capability of the national pipeline grid to transport natural gas to various US markets. The report quantifies the capacity levels and utilization rates of major interstate pipeline companies in 1996 and the changes since 1990, as well as changes in markets and end-use consumption patterns. It also discusses the effects of proposed capacity expansions on capacity levels. The report consists of five chapters, several appendices, and a glossary. Chapter 1 discusses some of the operational and regulatory features of the US interstate pipeline system and how they affect overall system design, system utilization, and capacity expansions. Chapter 2 looks at how the exploration, development, and production of natural gas within North America is linked to the national pipeline grid. Chapter 3 examines the capability of the interstate natural gas pipeline network to link production areas to market areas, on the basis of capacity and usage levels along 10 corridors. The chapter also examines capacity expansions that have occurred since 1990 along each corridor and the potential impact of proposed new capacity. Chapter 4 discusses the last step in the transportation chain, that is, deliverability to the ultimate end user. Flow patterns into and out of each market region are discussed, as well as the movement of natural gas between States in each region. Chapter 5 examines how shippers reserve interstate pipeline capacity in the current transportation marketplace and how pipeline companies are handling the secondary market for short-term unused capacity. Four appendices provide supporting data and additional detail on the methodology used to estimate capacity. 32 figs., 15 tabs.

  6. Politics, proximity and the pipeline: Mapping public attitudes toward Keystone XL

    International Nuclear Information System (INIS)

    Gravelle, Timothy B.; Lachapelle, Erick

    2015-01-01

    The politics of oil pipelines have become increasingly salient in American politics in recent years. In particular, debates about economic benefits, energy security and environmental impact have been provoked by the proposed Keystone XL pipeline expansion intended to take bitumen from northern Alberta in Canada to refineries on the Gulf Coast in Texas. Drawing on data from recent surveys conducted by the Pew Research Center, this article asks a series of questions. What levels of support for (and opposition to) the pipeline exist among the American public? What are the roles of political factors (such as party identification and ideology), economic attitudes, environmental attitudes and proximity to the proposed pipeline route in shaping attitudes toward the pipeline? And how do political factors and proximity to the pipeline interact? We find that partisanship and ideology drive attitudes toward the Keystone XL pipeline, and that the effect of ideology is attenuated by proximity to the proposed route. The policy implications of these findings for energy infrastructure siting controversies are discussed. -- Highlights: •Americans are divided on the Keystone XL energy pipeline. •Attitudes toward Keystone XL are driven by political party identification and ideology. •Attitudes toward the pipeline are also shaped by attitudes toward the economy and global warming. •The effect of proximity on attitudes toward Keystone XL is non-linear. •Spatial proximity to the pipeline attenuates the effect of ideology

  7. Drug Development Pipeline

    Science.gov (United States)

    ... accredit more than 120 care centers and 53 affiliate programs nationwide. The high quality of specialized care ... today. Annual Fund Become a Corporate Supporter Cause Marketing Make a Charitable Gift Our Corporate Supporters Workplace ...

  8. Corporate social responsibility along pipelines: communities and corporations working together

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Edison D.R.; Lopes, Luciano E.; Danciguer, Lucilene; Macarini, Samuel; Souza, Maira de [Grupo de Aplicacao Interdisciplinar a Aprendizagem (GAIA), Campinas, SP (Brazil)

    2009-07-01

    improving communities' life quality. 7. Follow-up, supporting communities leaders during dissemination of information about pipelines, project fund-raising and implementation. 8. Creation and followup of companies' networks to support some of the projects elaborated by the communities. 9. Impact evaluation, measuring the results accomplished by the whole project after its realization. The overall process is monitored with management and quality tools such as PDCA and processes and results indicators. The elaboration of projects by communities' members, organizing their needs and requests, facilitates management decisions regarding private social investment. During the follow-up, GAIA supports the communities' fund-raising from several organizations, as well as creates networks of potential local supporters. Those initiatives tend to dilute the requests from communities to companies. Thus, companies foment communities' autonomy and citizenship, creating a situation in which both, companies and communities, are benefited. (author)

  9. Thinking on Sichuan-Chongqing gas pipeline transportation system reform under market-oriented conditions

    Science.gov (United States)

    Duan, Yanzhi

    2017-01-01

    The gas pipeline networks in Sichuan and Chongqing (Sichuan-Chongqing) region have formed a fully-fledged gas pipeline transportation system in China, which supports and promotes the rapid development of gas market in Sichuan-Chongqing region. In the circumstances of further developed market-oriented economy, it is necessary to carry out further the pipeline system reform in the areas of investment/financing system, operation system and pricing system to lay a solid foundation for improving future gas production and marketing capability and adapting itself to the national gas system reform, and to achieve the objectives of multiparty participated pipeline construction, improved pipeline transportation efficiency and fair and rational pipeline transportation prices. In this article, main thinking on reform in the three areas and major deployment are addressed, and corresponding measures on developing shared pipeline economy, providing financial support to pipeline construction, setting up independent regulatory agency to enhance the industrial supervision for gas pipeline transportation, and promoting the construction of regional gas trade market are recommended.

  10. Sustainable management of leakage from wastewater pipelines.

    Science.gov (United States)

    DeSilva, D; Burn, S; Tjandraatmadja, G; Moglia, M; Davis, P; Wolf, L; Held, I; Vollertsen, J; Williams, W; Hafskjold, L

    2005-01-01

    Wastewater pipeline leakage is an emerging concern in Europe, especially with regards to the potential effect of leaking effluent on groundwater contamination and the effects infiltration has on the management of sewer reticulation systems. This paper describes efforts by Australia, in association with several European partners, towards the development of decision support tools to prioritize proactive rehabilitation of wastewater pipe networks to account for leakage. In the fundamental models for the decision support system, leakage is viewed as a function of pipeline system deterioration. The models rely on soil type identification across the service area to determine the aggressiveness of the pipe environment and for division of the area into zones based on pipe properties and operational conditions. By understanding the interaction between pipe materials, operating conditions, and the pipe environment in the mechanisms leading to pipe deterioration, the models allow the prediction of leakage rates in different zones across a network. The decision support system utilizes these models to predict the condition of pipes in individual zones, and to optimize the utilization of rehabilitation resources by targeting the areas with the highest leakage rates.

  11. Toward cognitive pipelines of medical assistance algorithms.

    Science.gov (United States)

    Philipp, Patrick; Maleshkova, Maria; Katic, Darko; Weber, Christian; Götz, Michael; Rettinger, Achim; Speidel, Stefanie; Kämpgen, Benedikt; Nolden, Marco; Wekerle, Anna-Laura; Dillmann, Rüdiger; Kenngott, Hannes; Müller, Beat; Studer, Rudi

    2016-09-01

    Assistance algorithms for medical tasks have great potential to support physicians with their daily work. However, medicine is also one of the most demanding domains for computer-based support systems, since medical assistance tasks are complex and the practical experience of the physician is crucial. Recent developments in the area of cognitive computing appear to be well suited to tackle medicine as an application domain. We propose a system based on the idea of cognitive computing and consisting of auto-configurable medical assistance algorithms and their self-adapting combination. The system enables automatic execution of new algorithms, given they are made available as Medical Cognitive Apps and are registered in a central semantic repository. Learning components can be added to the system to optimize the results in the cases when numerous Medical Cognitive Apps are available for the same task. Our prototypical implementation is applied to the areas of surgical phase recognition based on sensor data and image progressing for tumor progression mappings. Our results suggest that such assistance algorithms can be automatically configured in execution pipelines, candidate results can be automatically scored and combined, and the system can learn from experience. Furthermore, our evaluation shows that the Medical Cognitive Apps are providing the correct results as they did for local execution and run in a reasonable amount of time. The proposed solution is applicable to a variety of medical use cases and effectively supports the automated and self-adaptive configuration of cognitive pipelines based on medical interpretation algorithms.

  12. Environmental audit guidelines for pipelines

    International Nuclear Information System (INIS)

    1991-01-01

    Environmental auditing is a form of management control which provides an objective basis by which a company can measure the degree of compliance with environmental regulations. Other benefits of this type of auditing include improved environmental management, furthering communication on environmental issues of concern within the company, and provision of documentation on environmental diligence. A series of environmental audit guidelines for pipelines is presented in the form of lists of questions to be asked during an environmental audit followed by recommended actions in response to those questions. The questions are organized into seven main categories: environmental management and planning; operating procedures; spill prevention; management of wastes and hazardous materials; environmental monitoring; construction of pipelines; and pipeline abandonment, decommissioning and site reclamation

  13. Emergency preparedness of OSBRA Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Milton P.; Torres, Carlos A.R.; Almeida, Francisco J.C. [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper presents the experience of PETROBRAS Transporte S. A. - TRANSPETRO in the preparation for emergencies in the OSBRA pipeline, showing specific aspects and solutions developed. The company has a standardized approach for the emergency management, based on risk analysis studies, risk management plan and contingency plans. To cover almost 1,000 km of pipeline, the Company avails of Emergency Response Centers and Environmental Defense Center, located at strategic points. In order to achieve preparation, fire fighting training and oil leakage elimination training are provided. Additionally, simulation exercises are performed, following a schedule worked out according to specific criteria and guidelines. As a conclusion, a picture is presented of the evolution of the preparation for emergencies in the OSBRA System which bears the enormous responsibility of transporting flammable products for almost 1,000 km of pipeline, crossing 40 municipalities, 3 states and the Federal District. (author)

  14. Crude Oil Corrosion Fatigue of L485MB Pipeline Steel

    Czech Academy of Sciences Publication Activity Database

    Gajdoš, Lubomír; Šperl, Martin; Bystrianský, J.

    2015-01-01

    Roč. 137, č. 5 (2015), 051401 ISSN 0094-9930 R&D Projects: GA TA ČR(CZ) TE02000162 Institutional support: RVO:68378297 Keywords : corrosion fatigue * crude oil * pipeline steel * S–N curve * separated water Subject RIV: JI - Composite Materials Impact factor: 0.476, year: 2015 http://pressurevesseltech.asmedigitalcollection.asme.org/article.aspx?articleID=2107675

  15. On the numerical stability analysis of pipelined Krylov subspace methods

    Czech Academy of Sciences Publication Activity Database

    Carson, E.T.; Rozložník, Miroslav; Strakoš, Z.; Tichý, P.; Tůma, M.

    submitted 2017 (2018) R&D Projects: GA ČR GA13-06684S Grant - others:GA MŠk(CZ) LL1202 Institutional support: RVO:67985807 Keywords : Krylov subspace methods * the conjugate gradient method * numerical stability * inexact computations * delay of convergence * maximal attainable accuracy * pipelined Krylov subspace methods * exascale computations

  16. Modal testing of hydraulic pipeline systems

    Science.gov (United States)

    Mikota, Gudrun; Manhartsgruber, Bernhard; Kogler, Helmut; Hammerle, Franz

    2017-11-01

    Dynamic models of fluid power systems require accurate descriptions of hydraulic pipeline systems. For laminar flow in a rigid pipeline, modal approximations of transcendental transfer functions lead to a multi-degrees-of-freedom description. This suggests the application of experimental modal analysis to investigate fluid dynamics in hydraulic pipeline systems. The concept of modal testing is adapted accordingly and demonstrated for a straight pipeline, the same pipeline with a single side branch, and a pipeline system with three side branches. Frequency response functions are determined by injecting a defined flow rate excitation and measuring pressure responses along the pipelines. The underlying theory is confirmed by comparisons between calculated transcendental, measured, and estimated rational frequency response functions. Natural frequencies, damping ratios, and pressure mode shapes are identified. Although the experiments are made for low flow rates and stiff pipeline walls, they indicate the way to perform modal testing in practical applications of fluid power.

  17. Natural disasters and the gas pipeline system.

    Science.gov (United States)

    1996-11-01

    Episodic descriptions are provided of the effects of the Loma Prieta earthquake (1989) on the gas pipeline systems of Pacific Gas & Electric Company and the Cit of Palo Alto and of the Northridge earthquake (1994) on Southern California Gas' pipeline...

  18. What, me worry? Pipeline certification at the FERC

    International Nuclear Information System (INIS)

    Schneider, J.D.

    1997-01-01

    Some of the new major pipeline projects that will bring Canadian gas into Chicago and the United States northeastern market were described. The seven projects discussed were: Independence Pipeline Company, Columbia's Millennium Project, Alliance Pipeline, Viking Voyageur, Pan Energy's Spectrum, Tennessee's Eastern Express, and National Fuel Expansion. The need for all this new capacity was questioned. The US FERC Commissioners are willing to let the market decide the need for this capacity. It was noted that the serious regulatory issues pipelines will face lie in the radically different rate treatment for pipelines, depending on the support the market shows for their respective projects. Various past decisions of the Federal Energy Regulatory Commission (FERC) were reviewed to illustrate the direction of the Commission's thinking in terms of regulatory approval, and to examine the question of whether FERC's approval policy makes good sense. The author's view is that the 'at risk' conditions of approval, coupled with incremental rate treatment by the Commission does, in fact, provide protection for consumers

  19. Development Of A Centrifugal Hydrogen Pipeline Gas Compressor

    Energy Technology Data Exchange (ETDEWEB)

    Di Bella, Francis A. [Concepts NREC, White River Junction, VY (United States)

    2015-04-16

    Concepts NREC (CN) has completed a Department of Energy (DOE) sponsored project to analyze, design, and fabricate a pipeline capacity hydrogen compressor. The pipeline compressor is a critical component in the DOE strategy to provide sufficient quantities of hydrogen to support the expected shift in transportation fuels from liquid and natural gas to hydrogen. The hydrogen would be generated by renewable energy (solar, wind, and perhaps even tidal or ocean), and would be electrolyzed from water. The hydrogen would then be transported to the population centers in the U.S., where fuel-cell vehicles are expected to become popular and necessary to relieve dependency on fossil fuels. The specifications for the required pipeline hydrogen compressor indicates a need for a small package that is efficient, less costly, and more reliable than what is available in the form of a multi-cylinder, reciprocating (positive displacement) compressor for compressing hydrogen in the gas industry.

  20. Integrity Evaluation of Oil and Gas Pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Jae Boong [Sungkyunkwan University, Suwon (Korea, Republic of)

    2001-02-15

    The length of oil and gas pipelines is increased much according to economic reasons and practicality, the construction of pipeline in Asia and Europe is going on global region in recently. This oil and gas pipelines is managed integrity to it's explosion property or environmental pollution riskiness. This paper is dealt with major defects type, using on integrity evaluation methods in developed countries, showing basic data to workout a countermeasure integrity evaluation of domestic pipelines.

  1. 76 FR 73570 - Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts 191, 192, 195 and 198 [Docket No. PHMSA-2010-0026] RIN 2137-AE59 Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations AGENCY: Pipeline and Hazardous Materials Safety Administration...

  2. 76 FR 303 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Science.gov (United States)

    2011-01-04

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 195 [Docket ID PHMSA-2010-0229] RIN 2137-AE66 Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of...

  3. 75 FR 4134 - Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines

    Science.gov (United States)

    2010-01-26

    .... PHMSA-2009-0421] Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines AGENCY: Pipeline and... INFORMATION: Background Pipeline leak detection is one of the many layers of protection in PHMSA's approach to... of these interconnected layers of protections, including advances in leak detection systems. These...

  4. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Science.gov (United States)

    2010-02-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-RSPA-2004-19854; Amdt. 192-113] RIN 2137-AE15 Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and Hazardous Materials Safety...

  5. Fishing activity near offshore pipelines, 2017

    NARCIS (Netherlands)

    Machiels, Marcel

    2018-01-01

    On the North Sea bottom lie numerous pipelines to link oil- or gas offshore drilling units, - platforms and processing stations on land. Although pipeline tubes are coated and covered with protective layers, the pipelines risk being damaged through man-made hazards like anchor dropping and fishing

  6. Lay Pipeline Abandonment Head during Some

    African Journals Online (AJOL)

    2016-12-01

    Dec 1, 2016 ... Fracture mechanics approach is used on API 5L X52 of wall thickness of 0.5 inches pipeline structure. The pipeline was failed in a ... barge and the hydrodynamic loading on the pipeline itself. The Response Amplitude Operator is simply a measure of the Heave, Surge and Pitch of the barge relative to wave ...

  7. Using Tracer Technology to Characterize Contaminated Pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Maresca, Joseph, W., Jr., Ph.D.; Bratton, Wesley, L., Ph.D., P.E.; Dickerson, Wilhelmina; Hales, Rochelle

    2005-12-30

    The Pipeline Characterization Using Tracers (PCUT) technique uses conservative and partitioning, reactive or other interactive tracers to remotely determine the amount of contaminant within a run of piping or ductwork. The PCUT system was motivated by a method that has been successfully used to characterize subsurface soil contaminants and is similar in operation to that of a gas chromatography column. By injecting a ?slug? of both conservative and partitioning tracers at one end (or section) of the piping and measuring the time history of the concentration of the tracers at the other end (or another section) of the pipe, the presence, location, and amount of contaminant within the pipe or duct can be determined. The tracers are transported along the pipe or duct by a gas flow field, typically air or nitrogen, which has a velocity that is slow enough so that the partitioning tracer has time to interact with the contaminant before the tracer slug completely passes over the contaminate region. PCUT not only identifies the presence of contamination, it also can locate the contamination along the pipeline and quantify the amount of residual. PCUT can be used in support of deactivation and decommissioning (D&D) of piping and ducts that may have been contaminated with hazardous chemicals such as chlorinated solvents, petroleum products, radioactive materials, or heavy metals, such as mercury.

  8. Oil pipeline valve automation for spill reduction

    Energy Technology Data Exchange (ETDEWEB)

    Mohitpour, Mo; Trefanenko, Bill [Enbridge Technology Inc, Calgary (Canada); Tolmasquim, Sueli Tiomno; Kossatz, Helmut [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Liquid pipeline codes generally stipulate placement of block valves along liquid transmission pipelines such as on each side of major river crossings where environmental hazards could cause or are foreseen to potentially cause serious consequences. Codes, however, do not stipulate any requirement for block valve spacing for low vapour pressure petroleum transportation, nor for remote pipeline valve operations to reduce spills. A review of pipeline codes for valve requirement and spill limitation in high consequence areas is thus presented along with a criteria for an acceptable spill volume that could be caused by pipeline leak/full rupture. A technique for deciding economically and technically effective pipeline block valve automation for remote operation to reduce oil spilled and control of hazards is also provided. In this review, industry practice is highlighted and application of the criteria for maximum permissible oil spill and the technique for deciding valve automation thus developed, as applied to ORSUB pipeline is presented. ORSUB is one of the three initially selected pipelines that have been studied. These pipelines represent about 14% of the total length of petroleum transmission lines operated by PETROBRAS Transporte S.A. (TRANSPETRO) in Brazil. Based on the implementation of valve motorization on these three pipeline, motorization of block valves for remote operation on the remaining pipelines is intended, depending on the success of these implementations, on historical records of failure and appropriate ranking. (author)

  9. A closed solution for the collapse load of pressurized pipelines in free spans

    Energy Technology Data Exchange (ETDEWEB)

    Bezerra, Luciano M. [Brasilia Univ., DF (Brazil). Dept. de Engenharia Civil; Murray, David W.; Xuejun Song [University of Alberta (Canada). Civil Engineering Dept.

    2005-07-01

    Submarine pipelines for oil exploitation, generally, are under internal pressure and compressive thermal loading. Due to rough see-bottom terrains, these pipelines may be supported only intermittently and span freely. The collapse of such pipelines may produce oil leakage to the environment. A common engineering practice for the determination of the collapse load of such pipelines is the use of finite element modeling. This paper presents an analytical method for the determination of the collapse load of pressurized pipelines extended over free spans. The formulation also takes into account the internal pressure and initial imperfection, generally present in these pipelines. Collapse load is determined from a deduced transcendental equation. Results of the presented formulation are compared with sophisticated finite element analyses. While sophisticated finite element analysis requires hours of computer processing, the present formulation takes practically no time to assess a good approximation for the collapse load of pressurized free span pipelines under compression. The present paper is not intended to substitute the more precise finite element analyses but to provide an easier, faster, and practical way to determine a first approximation of the collapse load of pressurized free span pipelines. (author)

  10. Nova Gas's pipeline to Asia

    International Nuclear Information System (INIS)

    Lea, N.

    1996-01-01

    The involvement of the Calgary-based company NOVA Gas International (NGI) in Malaysia's peninsular gas utilization (PGU) project, was described. Phase I and II of the project involved linking onshore gas processing plants with a natural gas transmission system. Phase III of the PGU project was a gas transmission pipeline that began midway up the west coast of peninsular Malaysia to the Malaysia-Thailand border. The complex 549 km pipeline included route selection, survey and soil investigation, archaeological study, environmental impact assessment, land acquisition, meter-station construction, telecommunication systems and office buildings. NGI was the prime contractor on the project through a joint venture with OGP Technical Services, jointly owned by NGI and Petronas, the Thai state oil company. Much of NGI's success was attributed to excellent interpersonal skills, particularly NGI's ability to build confidence and credibility with its Thai partners

  11. Determination of Erosion/Corrosion Rates in Hanford Tank Farms Radioactive Waste Transfer System Pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Washenfelder, D. J.; Girardot, C. L.; Wilson, E. R.; Page, J. A.; Engeman, J. K.; Gunter, J. R.; Johnson, J. M.; Baide, D. G.; Cooke, G. A.; Larson, J. D.; Castleberry, J. L.; Boomer, K. D.

    2015-11-05

    The twenty-eight double-shell underground radioactive waste storage tanks at the U. S. Department of Energy’s Hanford Site near Richland, WA are interconnected by the Waste Transfer System network of buried steel encased pipelines and pipe jumpers in below-grade pits. The pipeline material is stainless steel or carbon steel in 51 mm to 152 mm (2 in. to 6 in.) sizes. The pipelines carry slurries ranging up to 20 volume percent solids and supernatants with less than one volume percent solids at velocities necessary to prevent settling. The pipelines, installed between 1976 and 2011, were originally intended to last until the 2028 completion of the double-shell tank storage mission. The mission has been subsequently extended. In 2010 the Tank Operating Contractor began a systematic evaluation of the Waste Transfer System pipeline conditions applying guidelines from API 579-1/ASME FFS-1 (2007), Fitness-For-Service. Between 2010 and 2014 Fitness-for-Service examinations of the Waste Transfer System pipeline materials, sizes, and components were completed. In parallel, waste throughput histories were prepared allowing side-by-side pipeline wall thinning rate comparisons between carbon and stainless steel, slurries and supernatants and throughput volumes. The work showed that for transfer volumes up to 6.1E+05 m3 (161 million gallons), the highest throughput of any pipeline segment examined, there has been no detectable wall thinning in either stainless or carbon steel pipeline material regardless of waste fluid characteristics or throughput. The paper describes the field and laboratory evaluation methods used for the Fitness-for-Service examinations, the results of the examinations, and the data reduction methodologies used to support Hanford Waste Transfer System pipeline wall thinning conclusions.

  12. Determination of Erosion/Corrosion Rates in Hanford Tank Farms Radioactive Waste Transfer System Pipelines

    International Nuclear Information System (INIS)

    Washenfelder, D. J.; Girardot, C. L.; Wilson, E. R.; Page, J. A.; Engeman, J. K.; Gunter, J. R.; Johnson, J. M.; Baide, D. G.; Cooke, G. A.; Larson, J. D.; Castleberry, J. L.; Boomer, K. D.

    2015-01-01

    The twenty-eight double-shell underground radioactive waste storage tanks at the U. S. Department of Energy's Hanford Site near Richland, WA are interconnected by the Waste Transfer System network of buried steel encased pipelines and pipe jumpers in below-grade pits. The pipeline material is stainless steel or carbon steel in 51 mm to 152 mm (2 in. to 6 in.) sizes. The pipelines carry slurries ranging up to 20 volume percent solids and supernatants with less than one volume percent solids at velocities necessary to prevent settling. The pipelines, installed between 1976 and 2011, were originally intended to last until the 2028 completion of the double-shell tank storage mission. The mission has been subsequently extended. In 2010 the Tank Operating Contractor began a systematic evaluation of the Waste Transfer System pipeline conditions applying guidelines from API 579-1/ASME FFS-1 (2007), Fitness-For-Service. Between 2010 and 2014 Fitness-for-Service examinations of the Waste Transfer System pipeline materials, sizes, and components were completed. In parallel, waste throughput histories were prepared allowing side-by-side pipeline wall thinning rate comparisons between carbon and stainless steel, slurries and supernatants and throughput volumes. The work showed that for transfer volumes up to 6.1E+05 m 3 (161 million gallons), the highest throughput of any pipeline segment examined, there has been no detectable wall thinning in either stainless or carbon steel pipeline material regardless of waste fluid characteristics or throughput. The paper describes the field and laboratory evaluation methods used for the Fitness-for-Service examinations, the results of the examinations, and the data reduction methodologies used to support Hanford Waste Transfer System pipeline wall thinning conclusions.

  13. Pipelines : how do proposed increases in crude production impact the Canadian pipeline picture?

    International Nuclear Information System (INIS)

    Henderson, B.

    2005-01-01

    New markets and pipeline capacity are needed to support Western Canadian oil sands production. A corporate overview of Terasen, a Canadian company with an asset base of over $4 billion was provided in this presentation, as well as details of oil sands supply and infrastructure. A chart of Western Canadian crude supply was presented, along with a map of key current and future markets. It was noted that traditional gas production is expected to decline by 4 per cent per year. Heavy crudes are expected to decline by 3 per cent per year, with imports expected to increase by 460,000 bpd by 2015. However, the Canadian market will face competition from South America. Details of the Far East market were reviewed. Strong West Coast demand has resulted in capacity apportionment for most of 2003 and 2004. Various express opportunities were examined. Corridor expansion was discussed in relation to the Bison project and the Heartland terminal in Edmonton. Choices for marine exports and TMX expansion were also reviewed. TMX representative tolls were listed. Specific project challenges include building and operating pipelines through rugged, environmentally sensitive terrain; stakeholder relations; and a need for shipper commitments. It was noted that there is strong support to continue development, with commercial discussions proceeding. An open season is planned for 2005, with new capacity expected to be in service by late 2006. Terasen's project plans include building strong customer relations; stakeholder engagement; and efficient construction strategies. tabs., figs

  14. Development of high productivity pipeline girth welding

    International Nuclear Information System (INIS)

    Yapp, David; Liratzis, Theocharis

    2010-01-01

    The trend for increased oil and gas consumption implies a growth of long-distance pipeline installations. Welding is a critical factor in the installation of pipelines, both onshore and offshore, and the rate at which the pipeline can be laid is generally determined by the speed of welding. This has resulted in substantial developments in pipeline welding techniques. Arc welding is still the dominant process used in practice, and forge welding processes have had limited successful application to date, in spite of large investments in process development. Power beam processes have also been investigated in detail and the latest laser systems now show promise for practical application. In recent years the use of high strength steels has substantially reduced the cost of pipeline installation, with X70 and X80 being commonly used. This use of high strength pipeline produced by thermomechanical processing has also been researched. They must all meet three requirments, high productivity, satisfactory weld properties, and weld quality

  15. Saudi Aramco experience towards establishing Pipelines Integrity Management System (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    Al-Ahmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  16. Saudi Aramco experience towards establishing Pipelines Integrity Management Systems (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    AlAhmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-12-19

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  17. Transforming microbial genotyping: a robotic pipeline for genotyping bacterial strains.

    Directory of Open Access Journals (Sweden)

    Brian O'Farrell

    Full Text Available Microbial genotyping increasingly deals with large numbers of samples, and data are commonly evaluated by unstructured approaches, such as spread-sheets. The efficiency, reliability and throughput of genotyping would benefit from the automation of manual manipulations within the context of sophisticated data storage. We developed a medium- throughput genotyping pipeline for MultiLocus Sequence Typing (MLST of bacterial pathogens. This pipeline was implemented through a combination of four automated liquid handling systems, a Laboratory Information Management System (LIMS consisting of a variety of dedicated commercial operating systems and programs, including a Sample Management System, plus numerous Python scripts. All tubes and microwell racks were bar-coded and their locations and status were recorded in the LIMS. We also created a hierarchical set of items that could be used to represent bacterial species, their products and experiments. The LIMS allowed reliable, semi-automated, traceable bacterial genotyping from initial single colony isolation and sub-cultivation through DNA extraction and normalization to PCRs, sequencing and MLST sequence trace evaluation. We also describe robotic sequencing to facilitate cherrypicking of sequence dropouts. This pipeline is user-friendly, with a throughput of 96 strains within 10 working days at a total cost of 200,000 items were processed by two to three people. Our sophisticated automated pipeline can be implemented by a small microbiology group without extensive external support, and provides a general framework for semi-automated bacterial genotyping of large numbers of samples at low cost.

  18. Evaluation of stress in the shore approach of submarine pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Del Vecchio, Cesar J.M.; Morikawa, Sergio R.K.; Moraes Neto, Accacio; Perrut, Valber A. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Llerena, Roberth W.A. [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), RJ (Brazil)

    2009-07-01

    Submarine pipelines that approach the shore in open sea sand beaches are affected by the constant variations in beach profile. Stresses due to the changes in pipe support conditions may be cause for concern in ageing pipelines if the shore approach profile varies considerably. This paper describes the evaluation of stresses in two pipelines installed in such a region. Initially stresses were measured by the hole-drilling strain gage method, in five sections at 120 deg intervals. Sections that are just above the sea level and completely immersed in the upper tide have been selected. Stresses were then monitored in the same sections for one year with Fiber Bragg Grating (FBG) extensometers. After one year, stresses were again measured by hole-drilling in selected positions. It was demonstrated that optical extensometers are a viable alternative to monitor slowly varying stresses over long periods of time in aggressive environments. It was also shown that stresses in the two pipelines are within acceptable limits. (author)

  19. The application of the finite element method for the low-cycle fatigue calculation of the elementsof the pipelines’ fixed support construction for the areas of above-ground routing of the oil pipeline «Zapolyarye — NPS „Pur-Pe“»

    Directory of Open Access Journals (Sweden)

    Surikov Vitaliy Ivanovich

    2014-02-01

    Full Text Available The present article studies the order of performing low-cycle fatigue strength calculation of the elements of the full-scale specimen construction of the fixed support DN 1000 of the above-ground oil pipeline “Zapolyarye — Purpe” during rig-testing. The calculation is performed with the aim of optimizing the quantity of testing and, accordingly, cost cutting for expensive experiments. The order of performing the calculation consists of two stages. At the first stage the calculation is performed by the finite element method of the full-scale specimen construction’s stressed-deformed state in the calculation complex ANSYS. Thearticle describes the main creation stages of the finite element calculation model for the full-scale specimen in ANSYS. The calculation model is developed in accordance with a three-dimensional model of the full-scale specimen, adapted for rig-testing by cyclic loads. The article provides the description of the full-scale specimen construction of the support and loading modes in rig-testing. Cyclic loads are accepted as calculation ones, which influence the support for the 50 years of the oil pipeline operation and simulate the composite impact in the process of the loads’ operation connected to the changes in the pumping pressure, operational bending moment. They also simulate preloading in the case of sagging of the neighboring free support. For the determination of the unobservable for the diagnostic devices defects impact on the reliability of the fixed support and welding joints of the fixed support with the oil pipeline by analogy with the full-scale specimen, artificial defects were embedded in the calculation model. The defects were performed in the form of cuts of the definite form, located in a special way in the spool and welding joints. At the second stage of calculation for low-cycle fatigue strength, the evaluation of the cyclic strength of the full-scale specimen construction’s elements of the

  20. Lessons Learned from Developing and Operating the Kepler Science Pipeline and Building the TESS Science Pipeline

    Science.gov (United States)

    Jenkins, Jon M.

    2017-01-01

    The experience acquired through development, implementation and operation of the KeplerK2 science pipelines can provide lessons learned for the development of science pipelines for other missions such as NASA's Transiting Exoplanet Survey Satellite, and ESA's PLATO mission.

  1. Chile's pipelines - who's out in the cold?

    International Nuclear Information System (INIS)

    Bellhouse, G.

    1998-01-01

    There is a battle on in Northern Chile to supply the region with gas and electricity. Two pipelines and a transmission line are being built, but there is insufficient demand to merit the construction of all of these projects. It is widely believed that the first pipeline to be finished will be the overall winner, but the situation is not that simple. A more sensible conclusion could be the merger of the two pipeline projects, rationalising supply of gas to the region. (Author)

  2. Pipeline dreams face up to reality

    International Nuclear Information System (INIS)

    Ryan, Orla

    1999-01-01

    This article gives details of two gas pipelines which are expected to be built in Turkey to meet the estimated demand for gas. The Bluestream joint ENI/Gasprom project pipeline will convey Russian gas across the Black Sea to Turkey, and the PSG joint Bechtel/General Electric venture will bring gas from Turkmenistan to Turkey across the Caspian Sea. Construction of the pipelines and financing aspects are discussed. (uk)

  3. Acoustic system for communication in pipelines

    Science.gov (United States)

    Martin, II, Louis Peter; Cooper, John F [Oakland, CA

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  4. Fluid mixing with a pipeline tee

    Energy Technology Data Exchange (ETDEWEB)

    Sroka, L.M.; Forney, L.J. (Georgia Inst. of Tech., Atlanta, GA (USA)); Forney, L.J. (Georgia Inst. of Tech., Atlanta, GA (USA))

    1988-01-01

    The pipeline mixing of two fluid streams by turbulent jet injection normal to the pipeline has been studied theoretically and experimentally. A simple scaling law for the second moment of the tracer concentration within the pipeline is proposed for the first fifteen pipe diameters downstream from the injection point. The similarity solution is derived by assuming that the tracer diffuses in a weak compound jet moving parallel to the pipeline axis. The theoretical results are correlated with all of the available experimental measurements. The results indicate that the second moment of the tracer concentration decreases with increasing jet momentum and distance from the injection point.

  5. Transmission pipeline calculations and simulations manual

    CERN Document Server

    Menon, E Shashi

    2014-01-01

    Transmission Pipeline Calculations and Simulations Manual is a valuable time- and money-saving tool to quickly pinpoint the essential formulae, equations, and calculations needed for transmission pipeline routing and construction decisions. The manual's three-part treatment starts with gas and petroleum data tables, followed by self-contained chapters concerning applications. Case studies at the end of each chapter provide practical experience for problem solving. Topics in this book include pressure and temperature profile of natural gas pipelines, how to size pipelines for specified f

  6. Tubular lining material for pipelines having bends

    Energy Technology Data Exchange (ETDEWEB)

    Moringa, A.; Sakaguchi, Y.; Hyodo, M.; Yagi, I.

    1987-03-24

    A tubular lining material for pipelines having bends or curved portions comprises a tubular textile jacket made of warps and wefts woven in a tubular form overlaid with a coating of a flexible synthetic resin. It is applicable onto the inner surface of a pipeline having bends or curved portions in such manner that the tubular lining material with a binder onto the inner surface thereof is inserted into the pipeline and allowed to advance within the pipeline, with or without the aid of a leading rope-like elongated element, while turning the tubular lining material inside out under fluid pressure. In this manner the tubular lining material is applied onto the inner surface of the pipeline with the binder being interposed between the pipeline and the tubular lining material. The lining material is characterized in that a part of all of the warps are comprised of an elastic yarn around which, over the full length thereof, a synthetic fiber yarn or yarns have been left-and/or right-handedly coiled. This tubular lining material is particularly suitable for lining a pipeline having an inner diameter of 25-200 mm and a plurality of bends, such as gas service pipelines or house pipelines, without occurrence of wrinkles in the lining material in a bend.

  7. Thermal expansion absorbing structure for pipeline

    International Nuclear Information System (INIS)

    Nagata, Takashi; Yamashita, Takuya.

    1995-01-01

    A thermal expansion absorbing structure for a pipeline is disposed to the end of pipelines to form a U-shaped cross section connecting a semi-circular torus shell and a short double-walled cylindrical tube. The U-shaped longitudinal cross-section is deformed in accordance with the shrinking deformation of the pipeline and absorbs thermal expansion. Namely, since the central lines of the outer and inner tubes of the double-walled cylindrical tube deform so as to incline, when the pipeline is deformed by thermal expansion, thermal expansion can be absorbed by a simple configuration thereby enabling to contribute to ensure the safety. Then, the entire length of the pipeline can greatly be shortened by applying it to the pipeline disposed in a high temperature state compared with a method of laying around a pipeline using only elbows, which has been conducted so far. Especially, when it is applied to a pipeline for an FBR-type reactor, the cost for the construction of a facility of a primary systems can greater be reduced. In addition, it can be applied to a pipeline for usual chemical plants and any other structures requiring absorption of deformation. (N.H.)

  8. East, West German gas pipeline grids linked

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ruhrgas AG, Essen, has started up the first large diameter gas pipeline linking the gas grids of former East and West Germany. Ruhrgas last month placed in service a 40 in., 70 km line at Vitzeroda, near Eisenach, linking a new Ruhrgas pipeline in Hesse state with a 330 km gas pipeline built last year in Thuringia and Saxony states by Erdgasversorgungs GmbH (EVG), Leipzig. The new link enables pipeline operator EVG to receive 70 bcf/year of western European gas via Ruhrgas, complementing the 35 bcf/year of gas coming from the Commonwealth of Independent States via Verbundnetz Gas AG (VNG), Leipzig

  9. A quick guide to pipeline engineering

    CERN Document Server

    Alkazraji, D

    2008-01-01

    Pipeline engineering requires an understanding of a wide range of topics. Operators must take into account numerous pipeline codes and standards, calculation approaches, and reference materials in order to make accurate and informed decisions.A Quick Guide to Pipeline Engineering provides concise, easy-to-use, and accessible information on onshore and offshore pipeline engineering. Topics covered include: design; construction; testing; operation and maintenance; and decommissioning.Basic principles are discussed and clear guidance on regulations is provided, in a way that will

  10. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    Science.gov (United States)

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2017-11-23

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly, and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions, and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog, and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu. Supplementary data are available at Bioinformatics online. © The Author (2017). Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  11. FEASIBILITY STUDY OF PRESSURE PULSING PIPELINE UNPLUGGING TECHNOLOGIES FOR HANFORD

    Energy Technology Data Exchange (ETDEWEB)

    Servin, M. A. [Washington River Protection Solutions, LLC, Richland, WA (United States); Garfield, J. S. [AEM Consulting, LLC (United States); Golcar, G. R. [AEM Consulting, LLC (United States)

    2012-12-20

    The ability to unplug key waste transfer routes is generally essential for successful tank farms operations. All transfer lines run the risk of plugging but the cross site transfer line poses increased risk due to its longer length. The loss of a transfer route needed to support the waste feed delivery mission impacts the cost and schedule of the Hanford clean up mission. This report addresses the engineering feasibility for two pressure pulse technologies, which are similar in concept, for pipeline unplugging.

  12. Feasibility Study Of Pressure Pulsing Pipeline Unplugging Technologies For Hanford

    International Nuclear Information System (INIS)

    Servin, M. A.; Garfield, J. S.; Golcar, G. R.

    2012-01-01

    The ability to unplug key waste transfer routes is generally essential for successful tank farms operations. All transfer lines run the risk of plugging but the cross site transfer line poses increased risk due to its longer length. The loss of a transfer route needed to support the waste feed delivery mission impacts the cost and schedule of the Hanford clean up mission. This report addresses the engineering feasibility for two pressure pulse technologies, which are similar in concept, for pipeline unplugging

  13. 77 FR 16052 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way; Submitted for Office of...

    Science.gov (United States)

    2012-03-19

    ... Modification (ROW)-- $3,865. Section 250.1008(e)--Pipeline Repair Notification--$360. Section 250.1015(a... Bureau of Safety and Environmental Enforcement Information Collection Activities: Pipelines and Pipeline... regulations under Subpart J, ``Pipelines and Pipeline Rights-of-Way.'' This notice also provides the public a...

  14. 78 FR 53190 - Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on...

    Science.gov (United States)

    2013-08-28

    ... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal AGENCY: Pipeline... to Operators of Natural Gas and Hazardous Liquid Pipelines of a Recall on Leak Repair Clamps Due to...

  15. The Chandra Source Catalog 2.0: Data Processing Pipelines

    Science.gov (United States)

    Miller, Joseph; Allen, Christopher E.; Budynkiewicz, Jamie A.; Gibbs, Danny G., II; Paxson, Charles; Chen, Judy C.; Anderson, Craig S.; Burke, Douglas; Civano, Francesca Maria; D'Abrusco, Raffaele; Doe, Stephen M.; Evans, Ian N.; Evans, Janet D.; Fabbiano, Giuseppina; Glotfelty, Kenny J.; Graessle, Dale E.; Grier, John D.; Hain, Roger; Hall, Diane M.; Harbo, Peter N.; Houck, John C.; Lauer, Jennifer L.; Laurino, Omar; Lee, Nicholas P.; Martínez-Galarza, Juan Rafael; McCollough, Michael L.; McDowell, Jonathan C.; McLaughlin, Warren; Morgan, Douglas L.; Mossman, Amy E.; Nguyen, Dan T.; Nichols, Joy S.; Nowak, Michael A.; Plummer, David A.; Primini, Francis Anthony; Rots, Arnold H.; Siemiginowska, Aneta; Sundheim, Beth A.; Tibbetts, Michael; Van Stone, David W.; Zografou, Panagoula

    2018-01-01

    With the construction of the Second Chandra Source Catalog (CSC2.0), came new requirements and new techniques to create a software system that can process 10,000 observations and identify nearly 320,000 point and compact X-ray sources. A new series of processing pipelines have been developed to allow for deeper more complete exploration of the Chanda observations. In CSC1.0 there were 4 general pipelines, whereas in CSC2.0 there are 20 data processing pipelines that have been organized into 3 distinct phases of operation - detection, master matching and source property characterization.With CSC2.0, observations within one arcminute of each other are stacked before searching for sources. The detection phase of processing combines the data, adjusts for shifts in fine astrometry, detects sources, and assesses the likelihood that sources are real. During the master source phase, detections across stacks of observations are analyzed for coverage of the same source to produce a master source. Finally, in the source property phase, each source is characterized with aperture photometry, spectrometry, variability and other properties at theobservation, stack and master levels over several energy bands.We present how these pipelines were constructed and the challenges we faced in how we processed data ranging from virtually no counts to millions of counts, how pipelines were tuned to work optimally on a computational cluster, and how we ensure the data produced was correct through various quality assurance steps.This work has been supported by NASA under contract NAS 8-03060 to the Smithsonian Astrophysical Observatory for operation of the Chandra X-ray Center.

  16. Report on Boeing pipeline leak detection system

    International Nuclear Information System (INIS)

    Aichele, W.T.

    1978-08-01

    Testing was performed on both simulated (test) and existing (water) pipelines to evaluate the Boeing leak detection technique. This technique uses a transformer mounted around the pipe to induce a voltage level onto the pipeline. The induced ground potential is measured from a distant ground probe, inserted into the surrounding soil, with respect to the excited pipeline. The induced voltage level will depend on the soil characteristics, the distance from the excited pipeline, and the probe types. If liquid should leak from the excited pipeline, the escaping liquid will modify the induced potential of the soil surrounding the excited pipeline. This will change the response of the quiescent soil characteristics and cause the voltage level on the detecting probes in the area of the leak to increase. This voltage increase will indicate a soil anomaly. However, the liquid does not have to reach the detection probe to reveal an anomalous soil condition. Several different detection probes were used and evaluated for sensitivity and response time. Although not evaluated during this test, results indicate that a wire laid parallel to the pipe axis may be the best probe configuration. A general sensitivity figure for any of the probes cannot be made from these tests; however, the technique used will reliably detect a pipeline leak of ten gallons. An additional test was performed using the Boeing pipeline leak detection technique to locate the position and depth of an underground pipeline. This test showed that the location and depth of an excited pipeline could be determined from above the ground where other methods for pipeline location had previously failed

  17. STRESS AND STRAIN STATE OF REPAIRING SECTION OF PIPELINE

    Directory of Open Access Journals (Sweden)

    V. V. Nikolaev

    2015-01-01

    Full Text Available Reliability of continuous operation of pipelines is an actual problem. For this reason should be developed an effective warning system of the main pipelines‘  failures and accidents not only in design and operation but also in selected repair. Changing of linear, unloaded by bending position leads to the change of stress and strain state of pipelines. And besides this, the stress and strain state should be determined and controlled in the process of carrying out the repair works. The article presents mathematical model of pipeline’s section straining in viscoelastic setting taking into account soils creep and high-speed stress state of pipeline with the purpose of stresses evaluation and load-supporting capacity of repairing section of pipeline, depending on time.  Stress and strain state analysis of pipeline includes longitudinal and circular stresses calculation  with  account of axis-asymmetrical straining and  was  fulfilled  on  the base of momentless theory of shells. To prove the consistency of data there were compared the calcu- lation results and the solution results by analytical methods for different cases (long pipeline’s section strain only under influence of cross-axis action; long pipeline’s section strain under in- fluence of longitudinal stress; long pipeline’s section strain; which is on the elastic foundation, under influence of cross-axis action. Comparison results shows that the calculation error is not more than 3 %.Analysis of stress-strain state change of pipeline’s section was carried out with development  of  this  model,  which  indicates  the  enlargement  of  span  deflection  in  comparison with problem’s solution in elastic approach. It is also proved, that for consistent assessment of pipeline maintenance conditions, it is necessary to consider the areolas of rheological processes of soils. On the base of complex analysis of pipelines there were determined stresses and time

  18. Pipeline programs in the health professions, part 1: preserving diversity and reducing health disparities.

    Science.gov (United States)

    Smith, Sonya G; Nsiah-Kumi, Phyllis A; Jones, Pamela R; Pamies, Rubens J

    2009-09-01

    Racial and ethnic minorities are underrepresented in the health professions. Affirmative action and educational pipeline programs play a vital role in increasing the diversity of health professions, addressing educational opportunity gaps, and reducing health disparities. Part 1 of this 2-part series discusses the need for educational pipeline programs to assist underrepresented minorities (URMs) in entering the health professions and the importance of these programs in developing a cadre of diverse providers to reduce health care inequality. Part 1 presents an overview of diversity in the medical and health care workforce, educational enrichment programs, key components of successful pipeline programs, and notable pipeline examples for underrepresented students at the University of Nebraska Medical Center. Recommendations for improving and developing pipeline programs are also included. Part 2 reviews affirmative action case law and legislation along with recommendations for maintaining and reviewing diversity pipeline programs in light of recent anti-affirmative action challenges. Pipeline programs are an important strategy for addressing the shortage of URMs in the health professions. Anti-affirmative action initiatives threaten the existence of these student preparation programs and the ability of our nation to produce physicians of color and other health care providers who are more likely to serve in underrepresented communities and work to reduce related health disparities. Programs at universities and academic medical centers must develop innovative partnerships with underserved communities, adopt strategies that demonstrate a strong commitment to increasing racial and ethnic minorities in the health professions, and develop viable funding mechanisms to support diversity enrichment programs.

  19. Electrical fingerprint of pipeline defects

    International Nuclear Information System (INIS)

    Mica, Isabella; Polignano, Maria Luisa; Marco, Cinzia De

    2004-01-01

    Pipeline defects are dislocations that connect the source region of the transistor with the drain region. They were widely reported to occur in CMOS, BiCMOS devices and recently in SOI technologies. They can reduce device yield either by affecting the devices functionality or by increasing the current consumption under stand-by conditions. In this work the electrical fingerprint of these dislocations is studied, its purpose is to enable us to identify these defects as the ones responsible for device failure. It is shown that the pipeline defects are responsible for a leakage current from source to drain in the transistors. This leakage has a resistive characteristic and it is lightly modulated by the body bias. It is not sensitive to temperature; vice versa the off-current of a good transistor exhibits the well-known exponential dependence on 1/T. The emission spectrum of these defects was studied and compared with the spectrum of a good transistor. The paper aims to show that the spectrum of a defective transistor is quite peculiar; it shows well defined peaks, whereas the spectrum of a good transistor under saturation conditions is characterized by a broad spectral light emission distribution. Finally the deep-level transient spectroscopy (DLTS) is tried on defective diodes

  20. System reliability of corroding pipelines

    International Nuclear Information System (INIS)

    Zhou Wenxing

    2010-01-01

    A methodology is presented in this paper to evaluate the time-dependent system reliability of a pipeline segment that contains multiple active corrosion defects and is subjected to stochastic internal pressure loading. The pipeline segment is modeled as a series system with three distinctive failure modes due to corrosion, namely small leak, large leak and rupture. The internal pressure is characterized as a simple discrete stochastic process that consists of a sequence of independent and identically distributed random variables each acting over a period of one year. The magnitude of a given sequence follows the annual maximum pressure distribution. The methodology is illustrated through a hypothetical example. Furthermore, the impact of the spatial variability of the pressure loading and pipe resistances associated with different defects on the system reliability is investigated. The analysis results suggest that the spatial variability of pipe properties has a negligible impact on the system reliability. On the other hand, the spatial variability of the internal pressure, initial defect sizes and defect growth rates can have a significant impact on the system reliability.

  1. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Science.gov (United States)

    2012-10-11

    .... PHMSA-2012-0201] Pipeline Safety: Communication During Emergency Situations AGENCY: Pipeline and... this Advisory Bulletin to reiterate the importance of immediate dialogue between pipeline facility...: Communication During Emergency Situations Advisory: To further enhance the Department's safety efforts, PHMSA is...

  2. Oil and Natural Gas Pipelines, North America, 2010, Platts

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Oil and Natural Gas Pipeline geospatial data layer contains gathering, interstate, and intrastate natural gas pipelines, crude and product oil pipelines, and...

  3. Increase of ecological safety of the pipeline

    International Nuclear Information System (INIS)

    Dr Movsumov, Sh.N.; Prof Aliyev, F.G.

    2005-01-01

    Full text : For increase of ecological safety of the pipeline, necessary decrease of damage (risk) rendered by the pipeline on surrounding natural environment which depends: on the frequency of damage of the pipeline; on the volume poured oil; on the factor of sensitivity of an environment where flood of oil was. Frequency of damage of the pipeline depends on physico-chemical properties of a material of the pipeline, from its technical characteristics (thickness of a wall, length of a pipe, working pressure), on the seismic area of the district where the pipeline passed and also on the way of lining of the pipeline (underground or overground). The volume poured oil depends on diameter of the received damage, from stability of the pipeline mechanical and other external actions, from an ambient temperature, from capacity of the pipeline, from distance between the latches established in the pipeline, and also from time, necessary for their full closing. The factor of sensitivity of environment depends on geological structure and landscapes of district (mountain, the river, settlements) where passed the pipeline. At designing the pipeline, in report is shown questions of increase of ecological safety of the pipeline are considered at his construction and exploitation. For improvement of ecological safety of the pipeline is necessary to hold the following actions: Ecological education of the public, living near along a line of the oil pipeline; carrying out ecological monitoring; working of the public plan of response to oil spills; For ecological education of the public is necessary: carrying out informing of the public for all (technical, ecological, social and economic and legal) questions connected to an oil pipeline, and also on methods of protection of the rights at participation in acceptance of ecological significant decisions; Creation of public groups for realization of activity on observance of the legislation and to prevention of risks; Exposure of hot

  4. Analysis of buried pipelines at Kozloduy

    International Nuclear Information System (INIS)

    Asfura, A.

    1999-01-01

    This paper describes the analysis of the buried pipelines at Kozloduy NPP. It involves the description of the studied pipelines, their properties, a detailed description of the methodology applied, and the evaluation of the soil strain field as well as the graphical representation of the results obtained

  5. The LOFAR Known Pulsar Data Pipeline

    NARCIS (Netherlands)

    Alexov, A.; Hessels, J.W.T.; Mol, J.D.; Stappers, B.; van Leeuwen, J.

    2010-01-01

    Abstract: Transient radio phenomena and pulsars are one of six LOFAR Key Science Projects (KSPs). As part of the Transients KSP, the Pulsar Working Group (PWG) has been developing the LOFAR Pulsar Data Pipelines to both study known pulsars as well as search for new ones. The pipelines are being

  6. Testing the School-to-Prison Pipeline

    Science.gov (United States)

    Owens, Emily G.

    2017-01-01

    The School-to-Prison Pipeline is a social phenomenon where students become formally involved with the criminal justice system as a result of school policies that use law enforcement, rather than discipline, to address behavioral problems. A potentially important part of the School-to-Prison Pipeline is the use of sworn School Resource Officers…

  7. The MIRI Medium Resolution Spectrometer calibration pipeline

    NARCIS (Netherlands)

    Labiano, A.; Azzollini, R.; Bailey, J.; Beard, S.; Dicken, D.; García-Marín, M.; Geers, V.; Glasse, A.; Glauser, A.; Gordon, K.; Justtanont, K.; Klaassen, P.; Lahuis, F.; Law, D.; Morrison, J.; Müller, M.; Rieke, G.; Vandenbussche, B.; Wright, G.

    2016-01-01

    The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer (MRS) is the only mid-IR Integral Field Spectrometer on board James Webb Space Telescope. The complexity of the MRS requires a very specialized pipeline, with some specific steps not present in other pipelines of JWST instruments,

  8. Oil pipeline energy consumption and efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Hooker, J.N.

    1981-01-01

    This report describes an investigation of energy consumption and efficiency of oil pipelines in the US in 1978. It is based on a simulation of the actual movement of oil on a very detailed representation of the pipeline network, and it uses engineering equations to calculate the energy that pipeline pumps must have exerted on the oil to move it in this manner. The efficiencies of pumps and drivers are estimated so as to arrive at the amount of energy consumed at pumping stations. The throughput in each pipeline segment is estimated by distributing each pipeline company's reported oil movements over its segments in proportions predicted by regression equations that show typical throughput and throughput capacity as functions of pipe diameter. The form of the equations is justified by a generalized cost-engineering study of pipelining, and their parameters are estimated using new techniques developed for the purpose. A simplified model of flow scheduling is chosen on the basis of actual energy use data obtained from a few companies. The study yields energy consumption and intensiveness estimates for crude oil trunk lines, crude oil gathering lines and oil products lines, for the nation as well as by state and by pipe diameter. It characterizes the efficiency of typical pipelines of various diameters operating at capacity. Ancillary results include estimates of oil movements by state and by diameter and approximate pipeline capacity utilization nationwide.

  9. The School-to-Prison Pipeline

    Science.gov (United States)

    Elias, Marilyn

    2013-01-01

    Policies that encourage police presence at schools, harsh tactics including physical restraint, and automatic punishments that result in suspensions and out-of-class time are huge contributors to the school-to-prison pipeline, but the problem is more complex than that. The school-to-prison pipeline starts (or is best avoided) in the classroom.…

  10. Protection of pipelines affected by surface subsidence

    International Nuclear Information System (INIS)

    Luo, Y.; Peng, S.S.; Chen, H.J.

    1998-01-01

    Surface subsidence resulting from underground coal mining can cause problems for buried pipelines. A technique for assessing the level of stress on a subsidence-affected pipeline is introduced. The main contributors to the stress are identified, and mitigation techniques for reducing the stress are proposed. The proposed mitigation techniques were then successfully tested. 13 refs., 8 figs., 2 tabs

  11. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_vectors_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the lines of the pipeline in the GOM. All pipelines existing in the databases...

  12. Offshore Pipeline Locations in the Gulf of Mexico, Geographic NAD27, MMS (2007) [pipelines_points_mms_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Offshore Minerals Management Pipeline Locations for the Gulf of Mexico (GOM). Contains the points of the pipeline in the GOM. All pipelines existing in the databases...

  13. The Hyper Suprime-Cam software pipeline

    Science.gov (United States)

    Bosch, James; Armstrong, Robert; Bickerton, Steven; Furusawa, Hisanori; Ikeda, Hiroyuki; Koike, Michitaro; Lupton, Robert; Mineo, Sogo; Price, Paul; Takata, Tadafumi; Tanaka, Masayuki; Yasuda, Naoki; AlSayyad, Yusra; Becker, Andrew C.; Coulton, William; Coupon, Jean; Garmilla, Jose; Huang, Song; Krughoff, K. Simon; Lang, Dustin; Leauthaud, Alexie; Lim, Kian-Tat; Lust, Nate B.; MacArthur, Lauren A.; Mandelbaum, Rachel; Miyatake, Hironao; Miyazaki, Satoshi; Murata, Ryoma; More, Surhud; Okura, Yuki; Owen, Russell; Swinbank, John D.; Strauss, Michael A.; Yamada, Yoshihiko; Yamanoi, Hitomi

    2018-01-01

    In this paper, we describe the optical imaging data processing pipeline developed for the Subaru Telescope's Hyper Suprime-Cam (HSC) instrument. The HSC Pipeline builds on the prototype pipeline being developed by the Large Synoptic Survey Telescope's Data Management system, adding customizations for HSC, large-scale processing capabilities, and novel algorithms that have since been reincorporated into the LSST codebase. While designed primarily to reduce HSC Subaru Strategic Program (SSP) data, it is also the recommended pipeline for reducing general-observer HSC data. The HSC pipeline includes high-level processing steps that generate coadded images and science-ready catalogs as well as low-level detrending and image characterizations.

  14. optimization for trenchless reconstruction of pipelines

    Directory of Open Access Journals (Sweden)

    Zhmakov Gennadiy Nikolaevich

    2015-01-01

    Full Text Available Today the technologies of trenchless reconstruction of pipelines are becoming and more widely used in Russia and abroad. One of the most perspective is methods is shock-free destruction of the old pipeline being replaced with the help of hydraulic installations with working mechanism representing a cutting unit with knife disks and a conic expander. A construction of a working mechanism, which allows making trenchless reconstruction of pipelines of different diameters, is optimized and patented and its developmental prototype is manufactured. The dependence of pipeline cutting force from knifes obtusion of the working mechanisms. The cutting force of old steel pipelines with obtuse knife increases proportional to the value of its obtusion. Two stands for endurance tests of the knifes in laboratory environment are offered and patented.

  15. Efficiency improvements in pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.; Horton, J. F.

    1977-09-09

    This report identifies potential energy-conservative pipeline innovations that are most energy- and cost-effective and formulates recommendations for the R, D, and D programs needed to exploit those opportunities. From a candidate field of over twenty classes of efficiency improvements, eight systems are recommended for pursuit. Most of these possess two highly important attributes: large potential energy savings and broad applicability outside the pipeline industry. The R, D, and D program for each improvement and the recommended immediate next step are described. The eight technologies recommended for R, D, and D are gas-fired combined cycle compressor station; internally cooled internal combustion engine; methanol-coal slurry pipeline; methanol-coal slurry-fired and coal-fired engines; indirect-fired coal-burning combined-cycle pump station; fuel-cell pump station; drag-reducing additives in liquid pipelines; and internal coatings in pipelines.

  16. Millennium Pipeline Presentation : a new northeast passage

    International Nuclear Information System (INIS)

    Wolnik, J.

    1997-01-01

    Routes of the proposed Millennium Pipeline project were presented. The pipeline is to originate at the Empress gas field in Alberta and link up to eastern markets in the United States. One of the key advantages of the pipeline is that it will have the lowest proposed rates from Empress to Chicago and through links via affiliates to New York and other eastern markets. It will include 380 miles of new 36-inch pipeline and have a capacity of 650 million cubic feet per day. In many instances it will follow existing rights-of-way. The pipeline is expected to be in service for the 1999 winter heating season. The project sponsors are Columbia Gas Transmission, CMS Energy, MCN Energy, and Westcoast Energy. 6 figs

  17. Use of GRASS for routing gas pipeline rights-of-way

    International Nuclear Information System (INIS)

    Sydelko, P.J.

    1992-01-01

    This study, sponsored by the Gas Research Institute (GRI), was conducted to illustrate how a GIS (Geographic Information System) can be used to assess alternative routes for new gas pipeline rights-of-way (ROWs). The results show that a least-cost analysis using GRASS (Geographic Resources Analysis and Support System) is a good method for siting new gas pipeline ROWs on the basis of environmental and engineering constraints to pipeline construction and maintenance. The cost and time needed to use this least-cost approach compare favorably with the current methods used by gas pipeline company planners and engineers. The types of criteria used, as well as the costs or weights given to the criteria, can be changed easily. This provides the flexibility to assess several alternatives quickly and easily

  18. iProphet: multi-level integrative analysis of shotgun proteomic data improves peptide and protein identification rates and error estimates.

    Science.gov (United States)

    Shteynberg, David; Deutsch, Eric W; Lam, Henry; Eng, Jimmy K; Sun, Zhi; Tasman, Natalie; Mendoza, Luis; Moritz, Robert L; Aebersold, Ruedi; Nesvizhskii, Alexey I

    2011-12-01

    The combination of tandem mass spectrometry and sequence database searching is the method of choice for the identification of peptides and the mapping of proteomes. Over the last several years, the volume of data generated in proteomic studies has increased dramatically, which challenges the computational approaches previously developed for these data. Furthermore, a multitude of search engines have been developed that identify different, overlapping subsets of the sample peptides from a particular set of tandem mass spectrometry spectra. We present iProphet, the new addition to the widely used open-source suite of proteomic data analysis tools Trans-Proteomics Pipeline. Applied in tandem with PeptideProphet, it provides more accurate representation of the multilevel nature of shotgun proteomic data. iProphet combines the evidence from multiple identifications of the same peptide sequences across different spectra, experiments, precursor ion charge states, and modified states. It also allows accurate and effective integration of the results from multiple database search engines applied to the same data. The use of iProphet in the Trans-Proteomics Pipeline increases the number of correctly identified peptides at a constant false discovery rate as compared with both PeptideProphet and another state-of-the-art tool Percolator. As the main outcome, iProphet permits the calculation of accurate posterior probabilities and false discovery rate estimates at the level of sequence identical peptide identifications, which in turn leads to more accurate probability estimates at the protein level. Fully integrated with the Trans-Proteomics Pipeline, it supports all commonly used MS instruments, search engines, and computer platforms. The performance of iProphet is demonstrated on two publicly available data sets: data from a human whole cell lysate proteome profiling experiment representative of typical proteomic data sets, and from a set of Streptococcus pyogenes experiments

  19. DOOp: DAOSPEC Output Optimizer pipeline

    Science.gov (United States)

    Cantat-Gaudin, Tristan; Donati, Paolo; Pancino, Elena; Bragaglia, Angela; Vallenari, Antonella; Friel, Eileen D.; Sordo, Rosanna; Jacobson, Heather R.; Magrini, Laura

    2017-09-01

    The DAOSPEC Output Optimizer pipeline (DOOp) runs efficient and convenient equivalent widths measurements in batches of hundreds of spectra. It uses a series of BASH scripts to work as a wrapper for the FORTRAN code DAOSPEC (ascl:1011.002) and uses IRAF (ascl:9911.002) to automatically fix some of the parameters that are usually set by hand when using DAOSPEC. This allows batch-processing of quantities of spectra that would be impossible to deal with by hand. DOOp was originally built for the large quantity of UVES and GIRAFFE spectra produced by the Gaia-ESO Survey, but just like DAOSPEC, it can be used on any high resolution and high signal-to-noise ratio spectrum binned on a linear wavelength scale.

  20. The Very Large Array Data Processing Pipeline

    Science.gov (United States)

    Kent, Brian R.; Masters, Joseph S.; Chandler, Claire J.; Davis, Lindsey E.; Kern, Jeffrey S.; Ott, Juergen; Schinzel, Frank K.; Medlin, Drew; Muders, Dirk; Williams, Stewart; Geers, Vincent C.; Momjian, Emmanuel; Butler, Bryan J.; Nakazato, Takeshi; Sugimoto, Kanako

    2018-01-01

    We present the VLA Pipeline, software that is part of the larger pipeline processing framework used for the Karl G. Jansky Very Large Array (VLA), and Atacama Large Millimeter/sub-millimeter Array (ALMA) for both interferometric and single dish observations.Through a collection of base code jointly used by the VLA and ALMA, the pipeline builds a hierarchy of classes to execute individual atomic pipeline tasks within the Common Astronomy Software Applications (CASA) package. Each pipeline task contains heuristics designed by the team to actively decide the best processing path and execution parameters for calibration and imaging. The pipeline code is developed and written in Python and uses a "context" structure for tracking the heuristic decisions and processing results. The pipeline "weblog" acts as the user interface in verifying the quality assurance of each calibration and imaging stage. The majority of VLA scheduling blocks above 1 GHz are now processed with the standard continuum recipe of the pipeline and offer a calibrated measurement set as a basic data product to observatory users. In addition, the pipeline is used for processing data from the VLA Sky Survey (VLASS), a seven year community-driven endeavor started in September 2017 to survey the entire sky down to a declination of -40 degrees at S-band (2-4 GHz). This 5500 hour next-generation large radio survey will explore the time and spectral domains, relying on pipeline processing to generate calibrated measurement sets, polarimetry, and imaging data products that are available to the astronomical community with no proprietary period. Here we present an overview of the pipeline design philosophy, heuristics, and calibration and imaging results produced by the pipeline. Future development will include the testing of spectral line recipes, low signal-to-noise heuristics, and serving as a testing platform for science ready data products.The pipeline is developed as part of the CASA software package by an

  1. Current pipelines for neglected diseases.

    Science.gov (United States)

    di Procolo, Paolo; Jommi, Claudio

    2014-09-01

    This paper scrutinises pipelines for Neglected Diseases (NDs), through freely accessible and at-least-weekly updated trials databases. It updates to 2012 data provided by recent publications, and integrates these analyses with information on location of trials coordinators and patients recruitment status. Additionally, it provides (i) disease-specific information to better understand the rational of investments in NDs, (ii) yearly data, to understand the investment trends. The search identified 650 clinical studies. Leishmaniasis, Arbovirus infection, and Dengue are the top three diseases by number of clinical studies. Disease diffusion risk seems to be the most important driver of the clinical trials target choice, whereas the role played by disease prevalence and unmet need is controversial. Number of trials is stable between 2005 and 2010, with an increase in the last two years. Patient recruitment was completed for most studies (57.6%), and Phases II and III account for 35% and 28% of trials, respectively. The primary purpose of clinical investigations is prevention (49.3%), especially for infectious diseases with mosquitoes and sand flies as the vector, and treatment (43.2%), which is the primary target for parasitic diseases Research centres and public organisations are the most important clinical studies sponsors (58.9%), followed by the pharmaceutical industry (24.1%), foundations and non-governmental organisations (9.3%). Many coordinator centres are located in less affluent countries (43.7%), whereas OECD countries and BRICS account for 34.7% and 17.5% of trials, respectively. Information was partially missing for some parameters. Notwithstanding, and despite its descriptive nature, this research has enhanced the evidence of the literature on pipelines for NDs. Future contributions may further investigate whether trials metrics are consistent with the characteristics of the interested countries and the explicative variables of trials location, target

  2. Pipe locator for imaging underground pipelines (abstract)

    Science.gov (United States)

    Miyamoto, Y.; Wasa, Y.; Mori, K.; Kondo, Y.

    1988-11-01

    Recently, it becomes more important to locate the complex piping patterns such as tee, bend, riser, and the others with high accuracy for maintenance and protection of city gas pipelines. Hence, we have developed a new pipe locator system for imaging the complex underground pipelines using magnetic remote sensing techniques. The main framework of this development is the application of the pattern recognition of the magnetic field distribution to the location of buried pipelines in urban areas. The first step for imaging the complex pipelines is to measure the three-dimensional magnetic field distribution with high accuracy which is generated by the passage of the alternating signal current through buried pipeline. For this purpose a portable trolley unit which is capable of scanning the ground to collect data, the 10 three-axes coil sensors with a sensitivity of 1 μG which are aligned in the unit, and a filter system using a FFT signal processor which eliminates urban magnetic noise as high as 10 mG in some cases, were developed. The second step is to process the magnetic field distribution data, to extract the feature of the underground pipeline using the contour diagram and the three-dimensional drawing of the magnetic field, and to identify the complex piping patterns. Further, we recognized that a nonlinear least-square method algorithm for calculation of the pipeline's position was useful to improve the location accuracy.

  3. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Jeniffer, Barringer; William, Lukens; Patricia, Wild

    2002-01-01

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  4. ARTIP: Automated Radio Telescope Image Processing Pipeline

    Science.gov (United States)

    Sharma, Ravi; Gyanchandani, Dolly; Kulkarni, Sarang; Gupta, Neeraj; Pathak, Vineet; Pande, Arti; Joshi, Unmesh

    2018-02-01

    The Automated Radio Telescope Image Processing Pipeline (ARTIP) automates the entire process of flagging, calibrating, and imaging for radio-interferometric data. ARTIP starts with raw data, i.e. a measurement set and goes through multiple stages, such as flux calibration, bandpass calibration, phase calibration, and imaging to generate continuum and spectral line images. Each stage can also be run independently. The pipeline provides continuous feedback to the user through various messages, charts and logs. It is written using standard python libraries and the CASA package. The pipeline can deal with datasets with multiple spectral windows and also multiple target sources which may have arbitrary combinations of flux/bandpass/phase calibrators.

  5. Prospects for coal slurry pipelines in California

    Science.gov (United States)

    Lynch, J. F.

    1978-01-01

    The coal slurry pipeline segment of the transport industry is emerging in the United States. If accepted it will play a vital role in meeting America's urgent energy requirements without public subsidy, tax relief, or federal grants. It is proven technology, ideally suited for transport of an abundant energy resource over thousands of miles to energy short industrial centers and at more than competitive costs. Briefly discussed are the following: (1) history of pipelines; (2) California market potential; (3) slurry technology; (4) environmental benefits; (5) market competition; and (6) a proposed pipeline.

  6. Optimal hub location in pipeline networks

    Energy Technology Data Exchange (ETDEWEB)

    Dott, D.R.; Wirasinghe, S.C.; Chakma, A. [Univ. of Calgary, Alberta (Canada)

    1996-12-31

    This paper discusses optimization strategies and techniques for the location of natural gas marketing hubs in the North American gas pipeline network. A hub is a facility at which inbound and outbound network links meet and freight is redirected towards their destinations. Common examples of hubs used in the gas pipeline industry include gas plants, interconnects and market centers. Characteristics of the gas pipeline industry which are relevant to the optimization of transportation costs using hubs are presented. Allocation techniques for solving location-allocation problems are discussed. An outline of the research in process by the authors in the field of optimal gas hub location concludes the paper.

  7. Knowledge Pipeline: A Task Oriented Way to Implement Knowledge Management

    International Nuclear Information System (INIS)

    Pan Jiajie

    2014-01-01

    Concept of knowledge pipeline: There are many pipelines named by tasks or business processes in an organization. Knowledge contributors put knowledge to its corresponding pipelines. A maintenance team could keep the knowledge in pipelines clear and valid. Users could get knowledge just like opening a faucet in terms of their tasks or business processes

  8. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  9. Pipeline repair technology damage and repair assessment of pipelines with high residual stresses

    OpenAIRE

    Høie, Øyvind

    2015-01-01

    Master's thesis in Offshore technology : subsea technology Today in the offshore industry, there are an increasing number of pipelines that require both maintenance and repair. A wide specter of research in pipeline repair technology is available. Damage to a pipeline could be a quite complex event to analyze, due to the many different combinations of internal pipe stresses and damage types. Standards, such as DNV and ASTM have experimental based assessment methods for evaluating many of t...

  10. Pipeline integrity management: integration of geotechnical and mechanical assessment to control potential risks due to external forces

    Energy Technology Data Exchange (ETDEWEB)

    Malpartida Moya, John E.; Sota, Giancarlo Massucco de la; Seri, Walter [Compania Operadora de Gas del Amazonas, Lima (Peru)

    2009-07-01

    Every pipeline integrity management system evaluates and controls various threats. On pipelines which have particular characteristics as it is the case of the Andean pipelines and pipelines crossing jungles, one of the main threats are the external forces. Even, this threat causes a greater number of failures than other threats like corrosion or the third part damage. Facing this situation, the pipeline integrity management system of TgP has achieved an important development in the use and suitable handling of the information provided by diverse techniques of pipeline mechanical inspection and geotechnical inspection of the right-of-way (ROW). This document presents our methodology, which interrelate information of the in-line inspection, information of geotechnical inspections of the ROW, instrumentation (Strain Gages), topographic monitoring, among others. All this information is supported in a Geographic Information System (GIS) which allows us to integrate the information. By means of the pipeline integrity management system we control potential risks due to external forces, we have been able to act before events become critical, with no occurrence of failures. This system allows us simultaneously to optimize efforts and preserve the mechanical integrity of our pipelines, not producing neither personal nor environmental nor economical affectation. (author)

  11. Environmental analysis for pipeline gas demonstration plants

    Energy Technology Data Exchange (ETDEWEB)

    Stinton, L.H.

    1978-09-01

    The Department of Energy (DOE) has implemented programs for encouraging the development and commercialization of coal-related technologies, which include coal gasification demonstration-scale activities. In support of commercialization activities the Environmental Analysis for Pipeline Gas Demonstration Plants has been prepared as a reference document to be used in evaluating potential environmental and socioeconomic effects from construction and operation of site- and process-specific projects. Effluents and associated impacts are identified for six coal gasification processes at three contrasting settings. In general, impacts from construction of a high-Btu gas demonstration plant are similar to those caused by the construction of any chemical plant of similar size. The operation of a high-Btu gas demonstration plant, however, has several unique aspects that differentiate it from other chemical plants. Offsite development (surface mining) and disposal of large quantities of waste solids constitute important sources of potential impact. In addition, air emissions require monitoring for trace metals, polycyclic aromatic hydrocarbons, phenols, and other emissions. Potential biological impacts from long-term exposure to these emissions are unknown, and additional research and data analysis may be necessary to determine such effects. Possible effects of pollutants on vegetation and human populations are discussed. The occurrence of chemical contaminants in liquid effluents and the bioaccumulation of these contaminants in aquatic organisms may lead to adverse ecological impact. Socioeconomic impacts are similar to those from a chemical plant of equivalent size and are summarized and contrasted for the three surrogate sites.

  12. Impact of Pipeline Construction on Air Environment

    Science.gov (United States)

    Tomareva, I. A.; Kozlovtseva, E. Yu; Perfilov, V. A.

    2017-11-01

    The research of the environmental imbalance causes in the construction of pipelines is provided in the article. On the basis of the generalized data, a block diagram of a comprehensive model for reduction of the negative impact on the environment from the pipeline construction is made. It allowed us to identify the parameters of the subgoals describing the characteristics of measures to ensure the environmental balance as well as the parameters related to risk factors. The analysis of hazards made it possible to determine their sources, the probability of occurrence of a negative effect and to create a tree of causes of atmospheric pollution due to the pipeline construction. The research pays a special attention to the impact from the particulate matter of inorganic and abrasive dust on the air while pipeline construction.

  13. Citizenship program in near communities of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Mascarenhas, Carina R.; Vilas Boas, Ianne P. [TELSAN Engenharia, Belo Horizonte, MG (Brazil); Bourscheid, Pitagoras [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2009-12-19

    During the construction of a pipeline, the IENE - Engineering Unit of PETROBRAS, responsible for the construction and erection of pipelines and related plants in northeastern Brazil, crossed more than 7 states and 250 counties, had implemented a social responsibility program, in special a citizenship program. This action was the result of community studies located near of the pipelines AID - Direct Influence Area (438 yards right and left of the pipeline) and through the evidence that those locations were poor and have no personal documents and citizen position in society. This paper intents to share the experience of IENE about its citizen program that worked in three big lines: community mobilization; citizenship qualification; and citizenship board. This last one, turns possible to people obtains theirs personal documents and exercise the plenitude of citizenship. (author)

  14. Regular pipeline maintenance of gas pipeline using technical operational diagnostics methods

    Energy Technology Data Exchange (ETDEWEB)

    Volentic, J. [Gas Transportation Department, Slovensky plynarensky priemysel, Slovak Gas Industry, Bratislava (Slovakia)

    1997-12-31

    Slovensky plynarensky priemysel (SPP) has operated 17 487 km of gas pipelines in 1995. The length of the long-line pipelines reached 5 191 km, distribution network was 12 296 km. The international transit system of long-line gas pipelines ranged 1 939 km of pipelines of various dimensions. The described scale of transport and distribution system represents a multibillion investments stored in the ground, which are exposed to the environmental influences and to pipeline operational stresses. In spite of all technical and maintenance arrangements, which have to be performed upon operating gas pipelines, the gradual ageing takes place anyway, expressed in degradation process both in steel tube, as well as in the anti-corrosion coating. Within a certain time horizon, a consistent and regular application of methods and means of in-service technical diagnostics and rehabilitation of existing pipeline systems make it possible to save substantial investment funds, postponing the need in funds for a complex or partial reconstruction or a new construction of a specific gas section. The purpose of this presentation is to report on the implementation of the programme of in-service technical diagnostics of gas pipelines within the framework of regular maintenance of SPP s.p. Bratislava high pressure gas pipelines. (orig.) 6 refs.

  15. A Novel Method to Enhance Pipeline Trajectory Determination Using Pipeline Junctions

    Directory of Open Access Journals (Sweden)

    Hussein Sahli

    2016-04-01

    Full Text Available Pipeline inspection gauges (pigs have been used for many years to perform various maintenance operations in oil and gas pipelines. Different pipeline parameters can be inspected during the pig journey. Although pigs use many sensors to detect the required pipeline parameters, matching these data with the corresponding pipeline location is considered a very important parameter. High-end, tactical-grade inertial measurement units (IMUs are used in pigging applications to locate the detected problems of pipeline using other sensors, and to reconstruct the trajectories of the pig. These IMUs are accurate; however, their high cost and large sizes limit their use in small diameter pipelines (8″ or less. This paper describes a new methodology for the use of MEMS-based IMUs using an extended Kalman filter (EKF and the pipeline junctions to increase the position parameters’ accuracy and to reduce the total RMS errors even during the unavailability of above ground markers (AGMs. The results of this new proposed method using a micro-electro-mechanical systems (MEMS-based IMU revealed that the position RMS errors were reduced by approximately 85% compared to the standard EKF solution. Therefore, this approach will enable the mapping of small diameter pipelines, which was not possible before.

  16. Pipelines in Louisiana, Geographic NAD83, USGS (1999) [pipelines_la_usgs_1999

    Data.gov (United States)

    Louisiana Geographic Information Center — This dataset contains vector line map information of various pipelines throughout the State of Louisiana. The vector data contain selected base categories of...

  17. Slaying Hydra: A Python-Based Reduction Pipeline for the Hydra Multi-Object Spectrograph

    Science.gov (United States)

    Seifert, Richard; Mann, Andrew

    2018-01-01

    We present a Python-based data reduction pipeline for the Hydra Multi-Object Spectrograph on the WIYN 3.5 m telescope, an instrument which enables simultaneous spectroscopy of up to 93 targets. The reduction steps carried out include flat-fielding, dynamic fiber tracing, wavelength calibration, optimal fiber extraction, and sky subtraction. The pipeline also supports the use of sky lines to correct for zero-point offsets between fibers. To account for the moving parts on the instrument and telescope, fiber positions and wavelength solutions are derived in real-time for each dataset. The end result is a one-dimensional spectrum for each target fiber. Quick and fully automated, the pipeline enables on-the-fly reduction while observing, and has been known to outperform the IRAF pipeline by more accurately reproducing known RVs. While Hydra has many configurations in both high- and low-resolution, the pipeline was developed and tested with only one high-resolution mode. In the future we plan to expand the pipeline to work in most commonly used modes.

  18. Simulations of severe slugging during depressurization of an oil/gas pipeline

    Directory of Open Access Journals (Sweden)

    M. Nordsveen

    1997-01-01

    Full Text Available Dynamic simulators for pipelines with multiphase flow have proved to be important computational tools for both design and operational support of oil and gas production systems. One important aim of such simulators is to predict the arrival time and magnitude of outlet liquid transients after production changes made by an operator of a pipeline. A multiphase flow simulator (OLGA-94.1 with a two-fluid model has been applied to simulate depressurization of a pipeline during a shutdown procedure. During depressurization liquid slugs may form and propagate towards the outlet. The importance of the numerical method for predictions of such transients is demonstrated by using an Eulerian, finite difference, implicit, upwind scheme both with and without a front tracking scheme. First the initial conditions for the depressurization is established from a shut-down simulation where the production at the inlet is closed down, and the liquid comes to rest at low points along the pipeline. A realistic depressurization is simulated by opening a choke at the outlet of the pressurized pipeline. The numerical scheme without front tracking (standard scheme gives outlet gas and liquid flow rates which are smeared out in time due to numerical diffusion. Simulations with the front tracking scheme give intermittent gas-liquid flow arriving as sharp fronts at the outlet. The total remaining fluid in the pipeline after the depressurization is larger when using the standard scheme.

  19. Effects of EPI distortion correction pipelines on the connectome in Parkinson's Disease

    Science.gov (United States)

    Galvis, Justin; Mezher, Adam F.; Ragothaman, Anjanibhargavi; Villalon-Reina, Julio E.; Fletcher, P. Thomas; Thompson, Paul M.; Prasad, Gautam

    2016-03-01

    Echo-planar imaging (EPI) is commonly used for diffusion-weighted imaging (DWI) but is susceptible to nonlinear geometric distortions arising from inhomogeneities in the static magnetic field. These inhomogeneities can be measured and corrected using a fieldmap image acquired during the scanning process. In studies where the fieldmap image is not collected, these distortions can be corrected, to some extent, by nonlinearly registering the diffusion image to a corresponding anatomical image, either a T1- or T2-weighted image. Here we compared two EPI distortion correction pipelines, both based on nonlinear registration, which were optimized for the particular weighting of the structural image registration target. The first pipeline used a 3D nonlinear registration to a T1-weighted target, while the second pipeline used a 1D nonlinear registration to a T2-weighted target. We assessed each pipeline in its ability to characterize high-level measures of brain connectivity in Parkinson's disease (PD) in 189 individuals (58 healthy controls, 131 people with PD) from the Parkinson's Progression Markers Initiative (PPMI) dataset. We computed a structural connectome (connectivity map) for each participant using regions of interest from a cortical parcellation combined with DWI-based whole-brain tractography. We evaluated test-retest reliability of the connectome for each EPI distortion correction pipeline using a second diffusion scan acquired directly after the participants' first. Finally, we used support vector machine (SVM) classification to assess how accurately each pipeline classified PD versus healthy controls using each participants' structural connectome.

  20. A midas plugin to enable construction of reproducible web-based image processing pipelines.

    Science.gov (United States)

    Grauer, Michael; Reynolds, Patrick; Hoogstoel, Marion; Budin, Francois; Styner, Martin A; Oguz, Ipek

    2013-01-01

    Image processing is an important quantitative technique for neuroscience researchers, but difficult for those who lack experience in the field. In this paper we present a web-based platform that allows an expert to create a brain image processing pipeline, enabling execution of that pipeline even by those biomedical researchers with limited image processing knowledge. These tools are implemented as a plugin for Midas, an open-source toolkit for creating web based scientific data storage and processing platforms. Using this plugin, an image processing expert can construct a pipeline, create a web-based User Interface, manage jobs, and visualize intermediate results. Pipelines are executed on a grid computing platform using BatchMake and HTCondor. This represents a new capability for biomedical researchers and offers an innovative platform for scientific collaboration. Current tools work well, but can be inaccessible for those lacking image processing expertise. Using this plugin, researchers in collaboration with image processing experts can create workflows with reasonable default settings and streamlined user interfaces, and data can be processed easily from a lab environment without the need for a powerful desktop computer. This platform allows simplified troubleshooting, centralized maintenance, and easy data sharing with collaborators. These capabilities enable reproducible science by sharing datasets and processing pipelines between collaborators. In this paper, we present a description of this innovative Midas plugin, along with results obtained from building and executing several ITK based image processing workflows for diffusion weighted MRI (DW MRI) of rodent brain images, as well as recommendations for building automated image processing pipelines. Although the particular image processing pipelines developed were focused on rodent brain MRI, the presented plugin can be used to support any executable or script-based pipeline.

  1. Offshore pipeline influence on middle east religion

    Directory of Open Access Journals (Sweden)

    Delistoian Dmitri

    2017-12-01

    Full Text Available The Middle East is responsible for nearly 30% of world oil production. Oil export is possible just using oil tankers and pipelines. Most developed pipeline network it has Syria. At the same time Syria is a gateway to Europe oil market. Bearing in mind oil price decline, fight on oil markets becomes more pronounced. The consequences of this struggle are creating increasing religious tensions between Shiites and Sunnis. Syria becomes a global battlefield for the influence on Arabian oil.

  2. On-the-fly pipeline parallelism

    OpenAIRE

    Lee, I-Ting Angelina; Leiserson, Charles E.; Sukha, Jim; Zhang, Zhunping; Schardl, Tao Benjamin

    2013-01-01

    Pipeline parallelism organizes a parallel program as a linear sequence of s stages. Each stage processes elements of a data stream, passing each processed data element to the next stage, and then taking on a new element before the subsequent stages have necessarily completed their processing. Pipeline parallelism is used especially in streaming applications that perform video, audio, and digital signal processing. Three out of 13 benchmarks in PARSEC, a popular software benchmark suite design...

  3. 76 FR 75894 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way; Submitted for Office of...

    Science.gov (United States)

    2011-12-05

    ... repair report 3 1008(f) Submit report of pipeline failure analysis...... 30 1008(g) Submit plan of.... Sec. 250.1000(b)--Pipeline Application Modification (ROW)--$3,865. Sec. 250.1008(e)--Pipeline Repair... Bureau of Safety and Environmental Enforcement (BSEE) Information Collection Activities: Pipelines and...

  4. Frost heave and pipeline upheaval buckling

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, A. C. [University Engineering Department, Cambridge (United Kingdom); Williams, P. J. [Carleton Univ., Geotechnical Science Laboratories, Ottawa, ON (Canada)

    2003-10-01

    The interaction between frost heave and upheaval buckling and the potential effect of these two phenomena on the safety of Arctic pipelines is discussed. When soils freeze, ice forms within the pores between the particles. If the surface is free to move, it heaves, because of the expansion that accompanies freezing. Upheaval buckling occurs in longitudinally constrained buried pipelines which can lead to large upward movements of a pipeline. The driving force for upheaval is the longitudinal compressive force induced by operation of the pipeline. While uniform vertical movement does not affect functionality, movements that induce curvature can overstress a pipeline to a dangerous extent. This paper examines the adverse interaction between the longitudinal variability of frost heave and the propensity of heave-induced overbends, and the conditions under which they might lead to upheaval. Results obtained suggest that discontinuities in frost heave can be sufficient to destabilize a high-pressure pipeline and induce upheaval, even when the original 'as-laid' profile is perfectly straight and level. The heave is most likely to occur in winter, with the upheaval following in the summer when the operating temperature is higher and the uplift resistance is reduced. 27 refs., 2 figs.

  5. Outlook '98 - Gas and oil pipelines

    International Nuclear Information System (INIS)

    Curtis, B.

    1998-01-01

    Due to rising North American demand, especially by the United States, by the end of 1997 there were plans to build 15 new pipelines over the next three years, at an estimated cost of $17 billion. Canada''s proximity to the United States, combined with huge Canadian reserves, and the fact that Canada already supplies some 15 per cent of U.S. requirements, makes Canada the obvious choice for filling future demand. This explains why most, if not all, current pipeline expansion projects are targeting markets in the U.S. Market forces will determine which of the projects will actually go forward. From the point of view of the Canadian Energy Pipeline Association pipeline regulatory reform, pipeline safety, integrity and climate change will be the Association''s key concerns during 1998. To that end, the Association is cooperating with the National Energy Board in a multi-million dollar study of stress corrosion cracking. The Association has also developed a Manual of Recommended Practices for the use of member companies to assist them to tailor stress corrosion cracking practices to their own operations. Meeting Canada''s commitment at the Kyoto Conference for greenhouse gas emissions of six per cent below 1990 levels by the year 2008 to 2012 (in effect a 25 per cent reduction from the level anticipated in the year 2000), a very difficult task according to industry experts, is also among the high priority items on the pipeline industry''s agenda for 1998

  6. Detecting method and device for pipeline

    International Nuclear Information System (INIS)

    Hirano, Akihiko; Hirano, Atsuya; Otaka, Masahiro; Kanno, Satoshi; Amano, Kazuo; Miyazaki, Katsumasa; Hattori, Shigeo; Yamamoto, Michiyoshi

    1998-01-01

    The present invention provides a method of and a device for diagnosing integrity of pipelines having the surfaces being in a corrosive atmosphere in a nuclear power plant. Namely, through holes are perforated to the pipeline. The predetermined area in the inside of the pipeline is scanned by laser light through the through holes. A luminance distribution of the laser light reflected at the inner circumference of the pipeline is photographed by a CCD camera. The images of the distribution of the luminance is processed to pick out a failed state. The image of the failed state is measured to determine the dimension of the failure. Alternatively, an inspection module having a function of irradiating laser light and detecting the lasers is inserted from a portion which can be removed upon conducting detection among the inside of the pipeline system to a position of the object to be detected. A predetermined area is scanned by laser light. The luminance distribution of the laser light reflected in the pipeline is photographed by the CCD camera. The images of the luminance distribution are processed to pick out the failed state, and the image of the failed state is measured to determine the dimension of the failure. (I.S.)

  7. Astronomical pipeline processing using fuzzy logic

    Science.gov (United States)

    Shamir, Lior

    In the past few years, pipelines providing astronomical data have been becoming increasingly important. The wide use of robotic telescopes has provided significant discoveries, and sky survey projects such as SDSS and the future LSST are now considered among the premier projects in the field astronomy. The huge amount of data produced by these pipelines raises the need for automatic processing. Astronomical pipelines introduce several well-defined problems such as astronomical image compression, cosmic-ray hit rejection, transient detection, meteor triangulation and association of point sources with their corresponding known stellar objects. We developed and applied soft computing algorithms that provide new or improved solutions to these growing problems in the field of pipeline processing of astronomical data. One new approach that we use is fuzzy logic-based algorithms, which enables the automatic analysis of the astronomical pipelines and allows mining the data for not-yet-known astronomical discoveries such as optical transients and variable stars. The developed algorithms have been tested with excellent results on the NightSkyLive sky survey, which provides a pipeline of 150 astronomical pictures per hour, and covers almost the entire global night sky.

  8. Federation in genomics pipelines: techniques and challenges.

    Science.gov (United States)

    Chaterji, Somali; Koo, Jinkyu; Li, Ninghui; Meyer, Folker; Grama, Ananth; Bagchi, Saurabh

    2017-08-29

    Federation is a popular concept in building distributed cyberinfrastructures, whereby computational resources are provided by multiple organizations through a unified portal, decreasing the complexity of moving data back and forth among multiple organizations. Federation has been used in bioinformatics only to a limited extent, namely, federation of datastores, e.g. SBGrid Consortium for structural biology and Gene Expression Omnibus (GEO) for functional genomics. Here, we posit that it is important to federate both computational resources (CPU, GPU, FPGA, etc.) and datastores to support popular bioinformatics portals, with fast-increasing data volumes and increasing processing requirements. A prime example, and one that we discuss here, is in genomics and metagenomics. It is critical that the processing of the data be done without having to transport the data across large network distances. We exemplify our design and development through our experience with metagenomics-RAST (MG-RAST), the most popular metagenomics analysis pipeline. Currently, it is hosted completely at Argonne National Laboratory. However, through a recently started collaborative National Institutes of Health project, we are taking steps toward federating this infrastructure. Being a widely used resource, we have to move toward federation without disrupting 50 K annual users. In this article, we describe the computational tools that will be useful for federating a bioinformatics infrastructure and the open research challenges that we see in federating such infrastructures. It is hoped that our manuscript can serve to spur greater federation of bioinformatics infrastructures by showing the steps involved, and thus, allow them to scale to support larger user bases. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  9. Redefining the Data Pipeline Using GPUs

    Science.gov (United States)

    Warner, C.; Eikenberry, S. S.; Gonzalez, A. H.; Packham, C.

    2013-10-01

    There are two major challenges facing the next generation of data processing pipelines: 1) handling an ever increasing volume of data as array sizes continue to increase and 2) the desire to process data in near real-time to maximize observing efficiency by providing rapid feedback on data quality. Combining the power of modern graphics processing units (GPUs), relational database management systems (RDBMSs), and extensible markup language (XML) to re-imagine traditional data pipelines will allow us to meet these challenges. Modern GPUs contain hundreds of processing cores, each of which can process hundreds of threads concurrently. Technologies such as Nvidia's Compute Unified Device Architecture (CUDA) platform and the PyCUDA (http://mathema.tician.de/software/pycuda) module for Python allow us to write parallel algorithms and easily link GPU-optimized code into existing data pipeline frameworks. This approach has produced speed gains of over a factor of 100 compared to CPU implementations for individual algorithms and overall pipeline speed gains of a factor of 10-25 compared to traditionally built data pipelines for both imaging and spectroscopy (Warner et al., 2011). However, there are still many bottlenecks inherent in the design of traditional data pipelines. For instance, file input/output of intermediate steps is now a significant portion of the overall processing time. In addition, most traditional pipelines are not designed to be able to process data on-the-fly in real time. We present a model for a next-generation data pipeline that has the flexibility to process data in near real-time at the observatory as well as to automatically process huge archives of past data by using a simple XML configuration file. XML is ideal for describing both the dataset and the processes that will be applied to the data. Meta-data for the datasets would be stored using an RDBMS (such as mysql or PostgreSQL) which could be easily and rapidly queried and file I/O would be

  10. Overview of interstate hydrogen pipeline systems.

    Energy Technology Data Exchange (ETDEWEB)

    Gillette, J .L.; Kolpa, R. L

    2008-02-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  11. Overview of interstate hydrogen pipeline systems

    International Nuclear Information System (INIS)

    Gillette, J.L.; Kolpa, R.L.

    2008-01-01

    The use of hydrogen in the energy sector of the United States is projected to increase significantly in the future. Current uses are predominantly in the petroleum refining sector, with hydrogen also being used in the manufacture of chemicals and other specialized products. Growth in hydrogen consumption is likely to appear in the refining sector, where greater quantities of hydrogen will be required as the quality of the raw crude decreases, and in the mining and processing of tar sands and other energy resources that are not currently used at a significant level. Furthermore, the use of hydrogen as a transportation fuel has been proposed both by automobile manufacturers and the federal government. Assuming that the use of hydrogen will significantly increase in the future, there would be a corresponding need to transport this material. A variety of production technologies are available for making hydrogen, and there are equally varied raw materials. Potential raw materials include natural gas, coal, nuclear fuel, and renewables such as solar, wind, or wave energy. As these raw materials are not uniformly distributed throughout the United States, it would be necessary to transport either the raw materials or the hydrogen long distances to the appropriate markets. While hydrogen may be transported in a number of possible forms, pipelines currently appear to be the most economical means of moving it in large quantities over great distances. One means of controlling hydrogen pipeline costs is to use common rights-of-way (ROWs) whenever feasible. For that reason, information on hydrogen pipelines is the focus of this document. Many of the features of hydrogen pipelines are similar to those of natural gas pipelines. Furthermore, as hydrogen pipeline networks expand, many of the same construction and operating features of natural gas networks would be replicated. As a result, the description of hydrogen pipelines will be very similar to that of natural gas pipelines

  12. 76 FR 44985 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2011-07-27

    ... of underwater pipe should include the use of visual inspection by divers or instrumented detection... operators of gas and hazardous liquid pipelines to communicate the potential for damage to pipeline... facilities to determine and take appropriate action concerning changes in class location, failures, leakage...

  13. 77 FR 32631 - Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-13-000] Lion Oil... of the Commission's Rules of Practice and Procedure, 18 CFR 385.202 (2011), Lion Oil Trading & Transportation, Inc., Magnolia Pipeline Company, and El Dorado Pipeline Company, collectively, Lion Companies...

  14. The Dangers of Pipeline Thinking: How the School-to-Prison Pipeline Metaphor Squeezes out Complexity

    Science.gov (United States)

    McGrew, Ken

    2016-01-01

    In this essay Ken McGrew critically examines the "school-to-prison pipeline" metaphor and associated literature. The origins and influence of the metaphor are compared with the origins and influence of the competing "prison industrial complex" concept. Specific weaknesses in the "pipeline literature" are examined.…

  15. Marine Environmental Protection and Transboundary Pipeline Projects: A Case Study of the Nord Stream Pipeline

    NARCIS (Netherlands)

    Lott, Alexander

    2011-01-01

    The Nord Stream transboundary submarine pipeline, significant for its impact on the EU energy policy, has been a heav- ily debated issue in the Baltic Sea region during the past decade. This is partly due to the concerns over the effects that the pipeline might have on the Baltic Sea as a

  16. Skaha Lake crossing, innovations in pipeline installation

    International Nuclear Information System (INIS)

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-01-01

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ''Surface Tow and Buoy Release Method'' (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994

  17. Pipeline risk assessment and control: Nigerian National Petroleum Pipeline network experience

    Energy Technology Data Exchange (ETDEWEB)

    Adubi, F.A.; Egho, P.I. [Pipelines and Products Marketing Company Ltd., Nigerian National Petroleum Corporation, Lagos (Nigeria)

    1992-12-31

    Third party encroachment and corrosion were identified as major causes of pipeline failure in Nigeria. The multi-faceted approach developed by the Nigerian National Petroleum Pipeline Corporation for effective assessment and control of risks to pipelines was described. In essence, information provided from each activity is used to complement information from other activities. This approach led to a better understanding of pipeline status and reduced risk of failures. Aerial surveillance was intensified in order to detect illegal activities, halt them, and remedy any damage. Efforts were also made to intensify corrosion monitoring and pipeline integrity surveys to avoid premature failures. Cathodic protection equipment was found to be only partially effective. due to vandalism and uncontrolled bush burning. 10 figs., 1 ref.

  18. Building Effective Pipelines to Increase Diversity in the Geosciences

    Science.gov (United States)

    Snow, E.; Robinson, C. R.; Neal-Mujahid, R.

    2017-12-01

    The U.S. Geological Survey (USGS) recognizes and understands the importance of a diverse workforce in advancing our science. Valuing Differences is one of the guiding principles of the USGS, and is the critical basis of the collaboration among the Youth and Education in Science (YES) program in the USGS Office of Science, Quality, and Integrity (OSQI), the Office of Diversity and Equal Opportunity (ODEO), and USGS science centers to build pipeline programs targeting diverse young scientists. Pipeline programs are robust, sustained relationships between two entities that provide a pathway from one to the other, in this case, from minority serving institutions to the USGS. The USGS has benefited from pipeline programs for many years. Our longest running program, with University of Puerto Rico Mayaguez (UPR), is a targeted outreach and internship program that has been managed by USGS scientists in Florida since the mid-1980's Originally begun as the Minority Participation in the Earth Sciences (MPES ) Program, it has evolved over the years, and in its several forms has brought dozens of interns to the USGS. Based in part on that success, in 2006 USGS scientists in Woods Hole MA worked with their Florida counterparts to build a pipeline program with City College of New York (CCNY). In this program, USGS scientists visit CCNY monthly, giving a symposium and meeting with students and faculty. The talks are so successful that the college created a course around them. In 2017, the CCNY and UPR programs brought 12 students to the USGS for summer internships. The CCNY model has been so successful that USGS is exploring creating similar pipeline programs. The YES office is coordinating with ODEO and USGS science centers to identify partner universities and build relationships that will lead to robust partnership where USGS scientists will visit regularly to engage with faculty and students and recruit students for USGS internships. The ideal partner universities will have a

  19. Pipeline four-dimension management is the trend of pipeline integrity management in the future

    Energy Technology Data Exchange (ETDEWEB)

    Shaohua, Dong; Feifan; Zhongchen, Han [China National Petroleum Corporation (CNPC), Beijing (China)

    2009-07-01

    Pipeline integrity management is essential for today's operators to operate their pipelines safety and cost effectively. The latest developments of pipeline integrity management around the world are involved with change of regulation, industry standard and innovation of technology. And who know the trend of PIM in the future, which can be answered in the paper. As a result, the concept of P4DM was set up firstly in the world. The paper analyzed the pipeline HSE management, pipeline integrity management (PIM) and asset integrity management (AIM), the problem of management was produced, and also the Pipeline 4-dimension Management (P4DM) theory was brought forward. According to P4DM, from the hierarchy of P4DM, the management elements, fields, space and time was analyzed. The main content is P4DM integrate the space geography location and time, control and manage the pipeline system in whole process, anywhere and anytime. It includes the pipeline integrity, pipeline operation and emergency, which is integrated by IT system. It come true that the idea, solution, technology, organization, manager alternately intelligently control the process of management. What the paper talks about included the definition of pipeline 4D management, the research develop of P4DM, the theory of P4DM, the relationship between P4DM and PIM, the technology basis of P4DM, how to perform the P4DM and conclusion. The P4DM was produced, which provide the development direction of PIM in the future, and also provide the new ideas for PetroChina in the field of technology and management. (author)

  20. Underwater pipeline impact localization using piezoceramic transducers

    Science.gov (United States)

    Zhu, Junxiao; Ho, Siu Chun Michael; Patil, Devendra; Wang, Ning; Hirsch, Rachel; Song, Gangbing

    2017-10-01

    Reports indicated that impact events accounted for 47% of offshore pipeline failures, which calls for impact detection and localization for subsea pipelines. In this paper, an innovative method for rapid localization of impacts on underwater pipelines utilizing a novel determination technique for both arrival-time and group velocity (ATGV) of ultrasonic guided waves with lead zirconate titanate (PZT) transducers is described. PZT transducers mounted on the outer surface of a model pipeline were utilized to measure ultrasonic guided waves generated by impact events. Based on the signals from PZT sensors, the ATGV technique integrates wavelet decomposition, Hilbert transform and statistical analysis to pinpoint the arrival-time of the designated ultrasonic guided waves with a specific group velocity. Experimental results have verified the effectiveness and the localization accuracy for eight impact points along a model underwater pipeline. All estimations errors were small and were comparable with the wavelength of the designated ultrasonic guided waves. Furthermore, the method is robust against the low frequency structural vibration introduced by other external forces.

  1. JGI Plant Genomics Gene Annotation Pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Shu, Shengqiang; Rokhsar, Dan; Goodstein, David; Hayes, David; Mitros, Therese

    2014-07-14

    Plant genomes vary in size and are highly complex with a high amount of repeats, genome duplication and tandem duplication. Gene encodes a wealth of information useful in studying organism and it is critical to have high quality and stable gene annotation. Thanks to advancement of sequencing technology, many plant species genomes have been sequenced and transcriptomes are also sequenced. To use these vastly large amounts of sequence data to make gene annotation or re-annotation in a timely fashion, an automatic pipeline is needed. JGI plant genomics gene annotation pipeline, called integrated gene call (IGC), is our effort toward this aim with aid of a RNA-seq transcriptome assembly pipeline. It utilizes several gene predictors based on homolog peptides and transcript ORFs. See Methods for detail. Here we present genome annotation of JGI flagship green plants produced by this pipeline plus Arabidopsis and rice except for chlamy which is done by a third party. The genome annotations of these species and others are used in our gene family build pipeline and accessible via JGI Phytozome portal whose URL and front page snapshot are shown below.

  2. Diagnostics and reliability of pipeline systems

    CERN Document Server

    Timashev, Sviatoslav

    2016-01-01

    The book contains solutions to fundamental problems which arise due to the logic of development of specific branches of science, which are related to pipeline safety, but mainly are subordinate to the needs of pipeline transportation.          The book deploys important but not yet solved aspects of reliability and safety assurance of pipeline systems, which are vital aspects not only for the oil and gas industry and, in general, fuel and energy industries , but also to virtually all contemporary industries and technologies. The volume will be useful to specialists and experts in the field of diagnostics/ inspection, monitoring, reliability and safety of critical infrastructures. First and foremost, it will be useful to the decision making persons —operators of different types of pipelines, pipeline diagnostics/inspection vendors, and designers of in-line –inspection (ILI) tools, industrial and ecological safety specialists, as well as to researchers and graduate students.

  3. Bauxite slurry pipeline: start up operation

    Energy Technology Data Exchange (ETDEWEB)

    Othon, Otilio; Babosa, Eder; Edvan, Francisco; Brittes, Geraldo; Melo, Gerson; Janir, Joao; Favacho, Orlando; Leao, Marcos; Farias, Obadias [Vale, Rio de Janeiro, RJ (Brazil); Goncalves, Nilton [Anglo Ferrous Brazil S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The mine of Miltonia is located in Paragominas-PA, in the north of Brazil. Bauxite slurry pipeline starts at the Mine of Miltonia and finishes in the draining installation of Alunorte refinery at the port of Barcarena-PA, located approximately 244km away from the mine. The pipeline runs over seven cities and passes below four great rivers stream beds. The system was designed for an underground 24 inches OD steel pipe to carry 9.9 million dry metric tonnes per annum (dMTAs) of 50.5% solid concentration bauxite slurry, using only one pumping station. The system is composed by four storage tanks and six piston diaphragm pumps, supplying a flow of 1680 m3/h. There is a cathodic protection system along the pipeline extension to prevent external corrosion and five pressure monitoring stations to control hydraulic conditions, there is also a fiber optic cable interconnection between pump station and terminal station. Pipeline Systems Incorporated (PSI) was the designer and followed the commissioning program of the start up operations. This paper will describe the beginning of the pipeline operations, technical aspects of the project, the operational experiences acquired in these two years, the faced problems and also the future planning. (author)

  4. Bad Actors Criticality Assessment for Pipeline system

    Science.gov (United States)

    Nasir, Meseret; Chong, Kit wee; Osman, Sabtuni; Siaw Khur, Wee

    2015-04-01

    Failure of a pipeline system could bring huge economic loss. In order to mitigate such catastrophic loss, it is required to evaluate and rank the impact of each bad actor of the pipeline system. In this study, bad actors are known as the root causes or any potential factor leading to the system downtime. Fault Tree Analysis (FTA) is used to analyze the probability of occurrence for each bad actor. Bimbaum's Importance and criticality measure (BICM) is also employed to rank the impact of each bad actor on the pipeline system failure. The results demonstrate that internal corrosion; external corrosion and construction damage are critical and highly contribute to the pipeline system failure with 48.0%, 12.4% and 6.0% respectively. Thus, a minor improvement in internal corrosion; external corrosion and construction damage would bring significant changes in the pipeline system performance and reliability. These results could also be useful to develop efficient maintenance strategy by identifying the critical bad actors.

  5. Corrosion induced failure analysis of subsea pipelines

    International Nuclear Information System (INIS)

    Yang, Yongsheng; Khan, Faisal; Thodi, Premkumar; Abbassi, Rouzbeh

    2017-01-01

    Pipeline corrosion is one of the main causes of subsea pipeline failure. It is necessary to monitor and analyze pipeline condition to effectively predict likely failure. This paper presents an approach to analyze the observed abnormal events to assess the condition of subsea pipelines. First, it focuses on establishing a systematic corrosion failure model by Bow-Tie (BT) analysis, and subsequently the BT model is mapped into a Bayesian Network (BN) model. The BN model facilitates the modelling of interdependency of identified corrosion causes, as well as the updating of failure probabilities depending on the arrival of new information. Furthermore, an Object-Oriented Bayesian Network (OOBN) has been developed to better structure the network and to provide an efficient updating algorithm. Based on this OOBN model, probability updating and probability adaptation are performed at regular intervals to estimate the failure probabilities due to corrosion and potential consequences. This results in an interval-based condition assessment of subsea pipeline subjected to corrosion. The estimated failure probabilities would help prioritize action to prevent and control failures. Practical application of the developed model is demonstrated using a case study. - Highlights: • A Bow-Tie (BT) based corrosion failure model linking causation with the potential losses. • A novel Object-Oriented Bayesian Network (OOBN) based corrosion failure risk model. • Probability of failure updating and adaptation with respect to time using OOBN model. • Application of the proposed model to develop and test strategies to minimize failure risk.

  6. Monitoring device for the reactor pipelines

    International Nuclear Information System (INIS)

    Fukumoto, Akira.

    1983-01-01

    Purpose: To enable rapid and accurate operator's monitoring for the state of pipelines in a BWR type reactor. Constitution: Specific symbols are attached respectively to a fluid supply source constituting the pipelines of a nuclear reactor facility, a plurality of fluid passing points and equipments to be supplied with the fluid, and a symmetrical matrix comprising these symbols in rows and columns is constituted. Then, a matrix is prepared based on detection signals for the states of the liquid supply source, equipments to be supplied with fluid and pipeline equipments by rendering the matrix elements between the signals expressing the state capable of passing the fluid as 1 and the matrix elements between the signals expressing the state incapable of passing the fluid as 0 . The matrix thus prepared in a signal procession circuit and a matrix in a memory circuit previously storing the matrix expressing the normal state of the pipelines are compared to judge the state of the pipelines in a short time and with no misjudging. (Moriyama, K.)

  7. Hazard identification studies applied to oil pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Savio, Augusto; Alpert, Melina L. [TECNA S.A., Buenos Aires (Argentina)], e-mail: asavio@tecna.com, e-mail: malpert@tecna.com

    2008-07-01

    In order to assess risks inherent to an Oil Pipeline, it is imperative to analyze what happens 'outside the process'. HAZID (HAZard IDentification) studies are mainly carried out for this purpose. HAZID is a formal study which identifies hazards and risks associated to an operation or facility and enable its acceptability assessment. It is a brainstorming exercise guided by a typical 'Checklist', divided into four Sections: External, Facilities and Health Hazards and Issues pertaining to Project Execution, which are further subdivided into Hazard Categories. For each Category, there are 'Guide-words' and 'Prompts'. Even if an Oil Pipeline Risk Assessment can be performed by means of the above referred 'Checklist', carrying out the actual process can become lengthy and annoying due to the lack of specificity. This work aims at presenting the most suitable 'Checklist' for the identification of Oil Pipeline Risk Assessment, although it could be used for Gas Pipeline Risk Assessment too. Prepared ad hoc, this list, is based on the spill causes established by CONCAWE (CONservation of Clean Air Water in Europe). Performing Oil Pipeline Risk Assessment by means of specially formulated Checklist enables the Study Team to easily identify risks, shortens execution time and provides both accuracy and specificity. (author)

  8. Validation of pig operations through pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Tolmasquim, Sueli Tiomno [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil); Nieckele, Angela O. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica

    2005-07-01

    In the oil industry, pigging operations in pipelines have been largely applied for different purposes: pipe cleaning, inspection, liquid removal and product separation, among others. An efficient and safe pigging operation requires that a number of operational parameters, such as maximum and minimum pressures in the pipeline and pig velocity, to be well evaluated during the planning stage and maintained within stipulated limits while the operation is accomplished. With the objective of providing an efficient tool to assist in the control and design of pig operations through pipelines, a numerical code was developed, based on a finite difference scheme, which allows the simulation of two fluid transient flow, like liquid-liquid, gas-gas or liquid-gas products in the pipeline. Modules to automatically control process variables were included to employ different strategies to reach an efficient operation. Different test cases were investigated, to corroborate the robustness of the methodology. To validate the methodology, the results obtained with the code were compared with a real liquid displacement operation of a section of the OSPAR oil pipeline, belonging to PETROBRAS, with 30'' diameter and 60 km length, presenting good agreement. (author)

  9. 49 CFR 195.208 - Welding of supports and braces.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Welding of supports and braces. 195.208 Section 195.208 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... HAZARDOUS LIQUIDS BY PIPELINE Construction § 195.208 Welding of supports and braces. Supports or braces may...

  10. Stress analysis and mitigation measures for floating pipeline

    Science.gov (United States)

    Wenpeng, Guo; Yuqing, Liu; Chao, Li

    2017-03-01

    Pipeline-floating is a kind of accident with contingency and uncertainty associated to natural gas pipeline occurring during rainy season, which is significantly harmful to the safety of pipeline. Treatment measures against pipeline floating accident are summarized in this paper on the basis of practical project cases. Stress states of pipeline upon floating are analyzed by means of Finite Element Calculation method. The effectiveness of prevention ways and subsequent mitigation measures upon pipeline-floating are verified for giving guidance to the mitigation of such accidents.

  11. INVESTIGATION OF PIPELINES INTEGRITY ASSOCIATED WITH PUMP MODULES VIBRATION FOR PUMPING STATION 9 OF ALYESKA PIPELINE SERVICE COMPANY

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jy-An John [ORNL

    2009-09-01

    Since the operation of PS09 SR module in 2007, it has been observed that there is vibration in various parts of the structures, on various segments of piping, and on appurtenance items. At DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) request, ORNL Subject Matter Experts support PHMSA in its review and analysis of the observed vibration phenomenon. The review and analysis consider possible effects of pipeline design features, vibration characteristics, machinery configuration, and operating practices on the structural capacity and leak tight integrity of the pipeline. Emphasis is placed on protection of welded joints and machinery against failure from cyclic loading. A series of vibration measurements were carried out by the author during the site visit to PS09, the power of the operating pump during the data collection is at about 2970KW, which is less than that of APSC's vibration data collected at 3900KW. Thus, a first order proportional factor of 4900/2970 was used to project the measured velocity data to that of APSC's measurement of the velocity data. It is also noted here that the average or the peak-hold value of the measured velocity data was used in the author's reported data, and only the maximum peak-hold data was used in APSC's reported data. Therefore, in some cases APSC's data is higher than the author's projective estimates that using the average data. In general the projected velocity data are consistent with APSC's measurements; the examples of comparison at various locations are illustrated in the Table 1. This exercise validates and confirms the report vibration data stated in APSC's summary report. After the reinforcement project for PS09 Station, a significant reduction of vibration intensity was observed for the associated pipelines at the SR Modules. EDI Co. provided a detailed vibration intensity investigation for the newly reinforced Pump Module structures and the associated

  12. Hubble Legacy Archive (HLA) Pipeline Progression

    Science.gov (United States)

    Anderson, Rachel E.; Casertano, S.; Lindsay, K.

    2013-01-01

    The HLA maintains a strong commitment to continuing improvement of our Hubble Space Telescope data processing pipelines with the goal of generating better science-ready data products. The HLA image processing pipeline is transitioning from the use of MultiDrizzle to AstroDrizzle for image registration and combination. It is expected that this change will allow for the creation of higher quality science products with improved astrometric solutions. Headerlets, a newly developed tool for AstroDrizzle, will be utilized and made available to simplify access to multiple astrometric solutions for a given data set. The capabilities of AstroDrizzle will allow for functionally simplified data processing, standardizing and streamlining the data reduction process and making it easier for users to reproduce our results. We are beginning with the HLA WFC3 data processing pipeline, and then plan to extend its application to other HST instrument data.

  13. Digitally assisted pipeline ADCs theory and implementation

    CERN Document Server

    Murmann, Boris

    2007-01-01

    List of Figures. List of Tables. Acknowledgements. Preface. 1: Introduction. 1. Motivation. 2. Overview. 3. Chapter Organization. 2: Performance Trends. 1. Introduction. 2. Digital Performance Trends. 3. ADC Performance Trends. 3: Scaling Analysis. 1. Introduction. 2. Basic Device Scaling from a Digital Perspective. 3. Technology Metrics for Analog Circuits. 4. Scaling Impact on Matching-Limited Circuits. 5. Scaling Impact on Noise-Limited Circuits. 4: Improving Analog Circuit Efficiency. 1. Introduction. 2. Analog Circuit Challenges. 3. The Cost of Feedback. 4. Two-Stage Feedback Amplifier vs. Open-Loop Gain Stage. 5. Discussion. 5: Open-Loop Pipelined ADCs. 1. A Brief Review of Pipelined ADCs. 2. Conventional Stage Implementation. 3. Open-Loop Pipeline Stages. 4. Alternative Transconductor Implementations. 6: Digital Nonlinearity Correction. 1. Overview. 2. Error Model and Digital Correction. 3. Alternative Error Models. 7: Statistics-Based Parameter Estimation. 1. Introduction. 2. Modulation Approach. 3. R...

  14. V-GAP: Viral genome assembly pipeline

    KAUST Repository

    Nakamura, Yoji

    2015-10-22

    Next-generation sequencing technologies have allowed the rapid determination of the complete genomes of many organisms. Although shotgun sequences from large genome organisms are still difficult to reconstruct perfect contigs each of which represents a full chromosome, those from small genomes have been assembled successfully into a very small number of contigs. In this study, we show that shotgun reads from phage genomes can be reconstructed into a single contig by controlling the number of read sequences used in de novo assembly. We have developed a pipeline to assemble small viral genomes with good reliability using a resampling method from shotgun data. This pipeline, named V-GAP (Viral Genome Assembly Pipeline), will contribute to the rapid genome typing of viruses, which are highly divergent, and thus will meet the increasing need for viral genome comparisons in metagenomic studies.

  15. Commissioning of long subsea pipelines - environmental aspects

    International Nuclear Information System (INIS)

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  16. BALBES: a molecular-replacement pipeline

    International Nuclear Information System (INIS)

    Long, Fei; Vagin, Alexei A.; Young, Paul; Murshudov, Garib N.

    2008-01-01

    The fully automated pipeline, BALBES, integrates a redesigned hierarchical database of protein structures with their domains and multimeric organization, and solves molecular-replacement problems using only input X-ray and sequence data. The number of macromolecular structures solved and deposited in the Protein Data Bank (PDB) is higher than 40 000. Using this information in macromolecular crystallography (MX) should in principle increase the efficiency of MX structure solution. This paper describes a molecular-replacement pipeline, BALBES, that makes extensive use of this repository. It uses a reorganized database taken from the PDB with multimeric as well as domain organization. A system manager written in Python controls the workflow of the process. Testing the current version of the pipeline using entries from the PDB has shown that this approach has huge potential and that around 75% of structures can be solved automatically without user intervention

  17. Pipeline maintenance, evaluation and inspection in water crossing: OSBRA case in Paranaiba River; Inspecao, avaliacao e manutencao de oleoduto em travessia: caso OSBRA (Oleoduto Sao Paulo-Brasilia) no Rio Paranaiba

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Newton Camelo de; Spagnolo, Rodrigo Alves; Vieira Paulo de Tarso [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Attempting to pipeline integrity proceeding of PETROBRAS, the OSBRA (Sao Paulo-Brasilia Pipeline) Management promoted field inspections by divers at Paranaiba River water crossing, located at your right-of-way pipeline. These services were composed by topography, visual inspections and local screened of the pipeline, determining the equipment layout at that water crossing. At Paranaiba River, the pipeline is seated above the river bed. The results indicated high spans in the pipeline structure. Considering this configuration, were made water speed and vibration measurements near the equipment. The activities were executed in order to assist the structural analysis of the pipeline. These studies had concluded to a temporary solution, which consisted in reducing loads and building additional supports. (author)

  18. Preventing erosion at pipeline crossings of watercourses

    International Nuclear Information System (INIS)

    Sawatsky, L.; Arnold, G.

    1997-01-01

    Watercourses are naturally vulnerable to erosion but the risk is particularly acute after sub-soil and armour materials have been disturbed by trenching and backfilling during construction. Various types of erosion (river scour, river bed, river channel bed and river bank ) and the progressive removal of pipeline cover resulting from erosion were discussed. Methods of estimating the risk of progressive erosion, river avulsions and beaver dam scour, and methods of mitigating erosion at pipeline crossings such as deep burial, proper siting, conventional armouring, and a combination of bank toe protection, and upper bank vegetation cover, were described

  19. Dynamics stresses in pipelines and components

    International Nuclear Information System (INIS)

    Prates, C.L.M.; Stukart, R.N.L.; Halbritter, A.L.

    1982-01-01

    The procedure to generate the dynamic stresses caused by external events, necessary for the structural calculation of pipelines and components in nuclear power plants is presented. A special attention is given to the stress caused by the action of earthquakes and exterior explosions. In the dynamic analysis of pipeline and components is usually to show the stresses procedured by these events under the response spectra form. The methodology to obtain these response spectra is shown and discussed. Some pratical examples of spectra from nuclear power plant building are still shown. (E.G.) [pt

  20. BALBES: a molecular-replacement pipeline.

    Science.gov (United States)

    Long, Fei; Vagin, Alexei A; Young, Paul; Murshudov, Garib N

    2008-01-01

    The number of macromolecular structures solved and deposited in the Protein Data Bank (PDB) is higher than 40 000. Using this information in macromolecular crystallography (MX) should in principle increase the efficiency of MX structure solution. This paper describes a molecular-replacement pipeline, BALBES, that makes extensive use of this repository. It uses a reorganized database taken from the PDB with multimeric as well as domain organization. A system manager written in Python controls the workflow of the process. Testing the current version of the pipeline using entries from the PDB has shown that this approach has huge potential and that around 75% of structures can be solved automatically without user intervention.

  1. Community and School Practices to Reduce Delinquent Behavior: Intervening on the School-to-Prison Pipeline

    Science.gov (United States)

    Shippen, Margaret E.; Patterson, DaShaunda; Green, Kemeche L.; Smitherman, Tracy

    2012-01-01

    Youth at risk for school failure need community and school supports to reduce the likelihood of developing delinquent behavior. This article provides an overview of community and school approaches aimed at intervening on the school-to-prison pipeline. Community and school efforts are emerging that take into account empirical evidence demonstrating…

  2. Logistics at the Amazon forest: the challenge of Urucu-Manaus pipeline construction

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Ricardo Magalhaes; Araujo, Jorge Marques de; Barbosa, Gilberto Rodrigues; Campos, Marcos Zeferino Teixeira [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The predominant difficulties and logistics complexities at the Amazon Region, required of the technical body responsible for the construction of the Undertaking Urucu-Manaus Pipeline, technological knowledge and a profound background of the regional particularities, qualities that were determinants for the execution of this significant work. The logistics solutions, supported on an accurate and adequate planning for people, equipment and material mobilization for several front services, were planned considering the constant climatic variables, river flood and dry periods and with the monitoring daily routines of the communities located around the pipeline construction influence area. (author)

  3. INTEGRATED LOGISTIC SUPPORT FOR ON-SHORE PIPELINE CONSTRUCTION

    OpenAIRE

    ERICA SOARES FONTES

    2008-01-01

    Este trabalho desenvolveu-se no ambiente das obras de dutos terrestres. Por meio de pesquisa bibliográfica, procurou-se adequar as práticas logísticas usadas em operações militares (logística expedicionária) às atividades de construção e montagem de dutos, em função de não existir, atualmente, um processo de planejamento integrado para as atividades logísticas em obras dessa natureza. Inicialmente, serão apresentados atividades, equipamentos, materiais e mão-de-obra utilizada na construção e...

  4. Experiences with Compiler Support for Processors with Exposed Pipelines

    DEFF Research Database (Denmark)

    Jensen, Nicklas Bo; Schleuniger, Pascal; Hindborg, Andreas Erik

    2015-01-01

    Field programmable gate arrays, FPGAs, have become an attractive implementation technology for a broad range of computing systems. We recently proposed a processor architecture, Tinuso, which achieves high performance by moving complexity from hardware to the compiler tool chain. This means...

  5. 49 CFR 195.248 - Cover over buried pipeline.

    Science.gov (United States)

    2010-10-01

    ... HAZARDOUS LIQUIDS BY PIPELINE Construction § 195.248 Cover over buried pipeline. (a) Unless specifically... millimeters) from high water mark to high water mark 48 (1219) 18 (457) Drainage ditches at public roads and...

  6. 77 FR 20807 - Northwest Pipeline GP; Notice of Application

    Science.gov (United States)

    2012-04-06

    ... diameter pipelines away from an adjacent surface coal mine west of Kemmerer, Wyoming. Northwest also... directed to Pam Barnes, Manager Certificates and Tariffs, Northwest Pipeline GP, 295 Chipeta Way, Salt Lake...

  7. HDPE (High Density Polyethylene) pipeline and riser design in Guanabara Bay: challenges and solutions

    Energy Technology Data Exchange (ETDEWEB)

    Bomfimsilva, Carlos; Jorge, Joao Paulo Carrijo; Schmid, Dominique; Gomes, Rodrigo Klim [INTECSEA, Sao Paulo, SP (Brazil); Lima, Alexander Piraja [GDK, Salvador, BA (Brazil)

    2009-12-19

    Worldwide shipments of plastic pipes are forecasted to increase 5.2% per year since 2008, being commonly used for water supply and sewage disposal. The HDPE (High Density Polyethylene) pipes have been applied recently to deliver potable water and fire fighting water for the main pier of the LNG system in Guanabara Bay, Rio de Janeiro. The system contains three sizes of pipe outside diameter, 110 mm and 160 mm for water supply, and 500 mm for the fire fighting system. The main design challenges of the pipeline system included providing on-bottom stability, a suitable installation procedure and a proper riser design. The on-bottom stability calculations, which are quite different from the conventional steel pipelines, were developed by designing concrete blocks to be assembled on the pipeline in a required spacing to assure long term stability, knowing that plastic pipes are buoyant even in flooded conditions. The installation procedure was developed considering the lay down methodology based on surface towing technique. The riser was designed to be installed together with additional steel support structure to allow the entire underwater system to have the same plastic pipe specification up to the surface. This paper presents the main challenges that were faced during the design of the HDPE pipelines for the LNG system in Guanabara Bay, addressing the solutions and recommendations adopted for the plastic underwater pipeline system.

  8. Extending the Fermi-LAT data processing pipeline to the grid

    Energy Technology Data Exchange (ETDEWEB)

    Zimmer, S. [Stockholm Univ., Stockholm (Sweden); The Oskar Klein Centre for Cosmoparticle Physics, Stockholm (Sweden); Arrabito, L. [Univ. Montpellier 2, Montpellier (France); Glanzman, T. [SLAC National Accelerator Lab., Menlo Park, CA (United States); Johnson, T. [SLAC National Accelerator Lab., Menlo Park, CA (United States); Lavalley, C. [Univ. Montpellier 2, Montpellier (France); Tsaregorodtsev, A. [Centre de Physique des Particules de Marseille, Marseille (France)

    2015-05-12

    The Data Handling Pipeline ("Pipeline") has been developed for the Fermi Gamma-Ray Space Telescope (Fermi) Large Area Telescope (LAT) which launched in June 2008. Since then it has been in use to completely automate the production of data quality monitoring quantities, reconstruction and routine analysis of all data received from the satellite and to deliver science products to the collaboration and the Fermi Science Support Center. Aside from the reconstruction of raw data from the satellite (Level 1), data reprocessing and various event-level analyses are also reasonably heavy loads on the pipeline and computing resources. These other loads, unlike Level 1, can run continuously for weeks or months at a time. Additionally, it receives heavy use in performing production Monte Carlo tasks.

  9. Repair methods for damaged pipeline beyond diving depth

    OpenAIRE

    Mohammadi, Keramat

    2011-01-01

    Master's thesis in Offshore Technology Mechanical damage of a subsea pipeline is found as one of the most severe concern in management of pipeline integrity. The need to reach and bring the hydrocarbons from the fields located in deep and ultra-deep waters, imposes the need to improve the technologies and techniques in order to repair any unacceptable damage in pipeline. The main objective of this work is to investigate various methods for repairing a subsea pipeline that has been damaged ...

  10. ORAC-DR: A generic data reduction pipeline infrastructure

    Science.gov (United States)

    Jenness, Tim; Economou, Frossie

    2015-03-01

    ORAC-DR is a general purpose data reduction pipeline system designed to be instrument and observatory agnostic. The pipeline works with instruments as varied as infrared integral field units, imaging arrays and spectrographs, and sub-millimeter heterodyne arrays and continuum cameras. This paper describes the architecture of the pipeline system and the implementation of the core infrastructure. We finish by discussing the lessons learned since the initial deployment of the pipeline system in the late 1990s.

  11. Multi-Criteria Decision Making Models for Water Pipelines

    OpenAIRE

    El Chanati, Hisham; El-Abbasy, Mohammed S.; Mosleh, Fadi; Senouci, Ahmed; Abouhamad, Mona; Gkountis, Iason; Zayed, Tarek; Al-Derham, Hassan

    2016-01-01

    The deterioration of water pipelines leads to impaired water quality, increased breakage rate, and reduced hydraulic capacity. The planning of maintenance programs for water pipelines is essential to minimize health and safety concerns and ensure an adequate supply of water in a safe, cost-effective, reliable, and sustainable manner. It is essential to assess the performance of water pipelines to assist municipalities in planning inspection and rehabilitation programs for their pipelines. Sev...

  12. 18 CFR 2.57 - Temporary certificates-pipeline companies.

    Science.gov (United States)

    2010-04-01

    ...-pipeline companies. 2.57 Section 2.57 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Policy and Interpretations Under the Natural Gas Act § 2.57 Temporary certificates—pipeline companies... the proposed construction is of major proportions. Pipeline companies are accordingly urged to conduct...

  13. Sensor and transmitter system for communication in pipelines

    Science.gov (United States)

    Cooper, John F.; Burnham, Alan K.

    2013-01-29

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  14. PIPELINE CORROSION CONTROL IN OIL AND GAS INDUSTRY: A ...

    African Journals Online (AJOL)

    Corrosion in pipelines is one of the major challenges faced by oil and gas industries all over the world. This has made corrosion control or management a major factor to consider before setting up any industry that will transport products via pipelines. In this study the types of corrosion found on system 2A pipeline were; ...

  15. 49 CFR 192.627 - Tapping pipelines under pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Tapping pipelines under pressure. 192.627 Section 192.627 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... under pressure. Each tap made on a pipeline under pressure must be performed by a crew qualified to make...

  16. The research of qualitative indicators of gas pipelines during the ...

    African Journals Online (AJOL)

    The operation of gas pipelines is a complex of technical measures, aimed at preservation of the main stock of gas pipeline transportation facilities. The purpose of these measures is to maintain and to restore the initial operational capabilities of gas pipelines, in general and in particular areas. The line section of gas ...

  17. Optical fiber sensing technology in the pipeline industry

    Energy Technology Data Exchange (ETDEWEB)

    Braga, A.M.B.; Llerena, R.W.A. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Engenharia Mecanica]. E-mail: abraga@mec.puc-rio.br; roberan@mec.puc-rio.br; Valente, L.C.G.; Regazzi, R.D. [Gavea Sensors, Rio de Janeiro, RJ (Brazil)]. E-mail: guedes@gaveasensors.com; regazzi@gaveasensors.com

    2003-07-01

    This paper is concerned with applications of optical fiber sensors to pipeline monitoring. The basic principles of optical fiber sensors are briefly reviewed, with particular attention to fiber Bragg grating technology. Different potential applications in the pipeline industry are discussed, and an example of a pipeline strain monitoring system based on optical fiber Bragg grating sensors is presented. (author)

  18. Legal and instututional framework for promoting oil pipeline security ...

    African Journals Online (AJOL)

    ... of the security agencies saddled with the overall responsibility for managing as well as safeguarding the pipelines to ensure their productivity; and overhauling the entire security apparatus put in place to protect oil pipelines in Nigeria by having a sustainable and strategic approach to dealing with oil pipeline insecurity.

  19. Development of a Free-Swimming Acoustic Tool for Liquid Pipeline Leak Detection Including Evaluation for Natural Gas Pipeline Applications

    Science.gov (United States)

    2010-08-01

    Significant financial and environmental consequences often result from line leakage of oil product pipelines. Product can escape into the surrounding soil as even the smallest leak can lead to rupture of the pipeline. From a health perspective, water...

  20. Evaluation of ultraliner PVC alloy pipeliner.

    Science.gov (United States)

    2013-12-01

    In an effort to evaluate promising pipe lining techniques, the Agency installed two Ultraliner : PVC Alloy Pipeliners in the town of Barton, Vermont in May of 2003; one in an 18 : - : inch (450 : mm nominal) reinforced concrete pipe (RCP) and one in ...

  1. The Effect of Landslide on Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Valkovič Vojtech

    2016-11-01

    Full Text Available The present paper deals with the calculation of stresses on the pipeline system embedded on a flexible substrate which is burdened by a landslide. As well as taking into account the probability of the influences acting on the pipe as wall thickness, and others.

  2. pipelines cathodic protection design methodologies for impressed

    African Journals Online (AJOL)

    HOD

    2 DEPARTMENT OF MECHANICAL ENGINEERING, DELTA STATE UNIVERSITY, OLEH CAMPUS, DELTA STATE, NIGERIA. E-mail addresses: .... with equation (11): pipeline leng t. Next is calculation of interval of pipe joint to determine interval of anode bracelet that will be placed. The interval of pipe joint is given as: ...

  3. Internal Corrosion Detection in Liquids Pipelines

    Science.gov (United States)

    2012-01-01

    PHMSA project DTRS56-05-T-0005 "Development of ICDA for Liquid Petroleum Pipelines" led to the development of a Direct Assessment (DA) protocol to prioritize locations of possible internal corrosion. The underlying basis LP-ICDA is simple; corrosion ...

  4. Annual compensation for pipelines in Alberta

    International Nuclear Information System (INIS)

    2008-11-01

    The Surface Rights Board (SRB) in Alberta held a hearing in November 2007 to address three issues involving a pipeline for Enbridge Pipelines (Athabasca) Inc. as well as several land owner issues in Townships 66-68 and Ranges 17-19, all west of the 4th Meridian. The issues the SRB examined were the appropriate amount (i.e. magnitude) of compensation payable under right of entry orders under consideration; the appropriate structure of the compensation award; and to whom the compensation was payable. This document presented a review by the Farmer's Advocate Office (FAO) of the published decision of the SRB. The verbatim decision and rationale used by the SRB to award annual compensation for loss and/or ongoing nuisance and inconvenience was presented. The document could be useful to landowners as they determine their negotiation strategy when faced with considering future pipeline access agreements. The document included a discussion of the context for the decision and a case review. Specific topics that were covered included the rationale for the decision; long term effects of pipeline arguments and SRB commentary; the award and determination; and what still needs to be done. It was concluded that the SRB requires evidence in order to answer several questions regarding the magnitude of any losses, and to what degree, if any, had the nuisance, inconvenience, and loss of rights already been anticipated and factored into the operator's final offer

  5. Vibrations in pipelines of nuclear power plants

    International Nuclear Information System (INIS)

    Leal, M.R.L.V.; Bevilacqua, L.

    1984-01-01

    It is presented the main causes of vibrations in nuclear power plants pipelines to allow the identification of critical areas and correct the errors during the specification design. The methods of vibration analysis to give subsidies in the determination of the corrective providences when the problem appears during the commissioning or the generation energy, are also presented. (M.C.K.) [pt

  6. Underwater Adhesives Retrofit Pipelines with Advanced Sensors

    Science.gov (United States)

    2015-01-01

    Houston-based Astro Technology Inc. used a partnership with Johnson Space Center to pioneer an advanced fiber-optic monitoring system for offshore oil pipelines. The company's underwater adhesives allow it to retrofit older deepwater systems in order to measure pressure, temperature, strain, and flow properties, giving energy companies crucial data in real time and significantly decreasing the risk of a catastrophe.

  7. Pipeline or Personal Preference: Women in Engineering

    Science.gov (United States)

    Schreuders, P. D.; Mannon, S. E.; Rutherford, B.

    2009-01-01

    Although the number of women in the engineering field has increased since the 1960s, those increases have largely stagnated over the last few years. This paper re-examines the pipeline for bringing women into engineering and, based on survey data, examines the attitudes, motivations, and interests of 969 male and female engineering students.…

  8. An integrative bioinformatics pipeline for the genomewide ...

    Indian Academy of Sciences (India)

    An integrative bioinformatics pipeline for the genomewide identification of novel porcine microRNA genes. Wei Fang, Na Zhou, Dengyun Li, Zhigang Chen, Pengfei Jiang and Deli Zhang. J. Genet. 92,587 593. Figure 1. Primary sequence of the predicted SSc-mir-2053 precursor and locations of some terms in the secondary ...

  9. Pipeline for Tracking Neural Progenitor Cells

    DEFF Research Database (Denmark)

    Vestergaard, Jacob Schack; Dahl, Anders Lindbjerg; Holm, Peter

    2012-01-01

    a key role in constructing these lineages. We present here a tracking pipeline based on learning a dictionary of discriminative image patches for segmentation and a graph formulation of the cell matching problem incorporating topology changes and acknowledging the fact that segmentation errors do occur...

  10. System Reliability Assessment of Offshore Pipelines

    NARCIS (Netherlands)

    Mustaffa, Z.

    2011-01-01

    The title of this thesis, System Reliability Assessment of Offshore Pipelines, portrays the application of probabilistic methods in assessing the reliability of these structures. The main intention of this thesis is to identify, apply and judge the suitability of the probabilistic methods in

  11. Runtime Modifications of Spark Data Processing Pipelines

    NARCIS (Netherlands)

    Lazovik, E.; Medema, M.; Albers, T.; Langius, E.A.F.; Lazovik, A.

    2017-01-01

    Distributed data processing systems are the standard means for large-scale data analysis in the Big Data field. These systems are based on processing pipelines where the processing is done via a composition of multiple elements or steps. In current distributed data processing systems, the code and

  12. Pipelines cathodic protection design methodologies for impressed ...

    African Journals Online (AJOL)

    Several inadequate designs of cathodically polarized offshore and onshore pipelines have been reported in Nigeria owing to design complexity and application of the cathodic protection system. The present study focused on critical and detailed approach in impressed current and sacrificial anode design calculation ...

  13. An integrative bioinformatics pipeline for the genomewide ...

    Indian Academy of Sciences (India)

    2013-12-06

    Dec 6, 2013 ... The majority of miRNAs in pig (Sus scrofa), an impor- tant domestic animal, remain unknown. From this perspec- tive, we attempted the genomewide identification of novel porcine miRNAs. Here, we propose a novel integrative bioinformatics pipeline to identify conservative and non- conservative novel ...

  14. Pipeline : Hebrew data from ETCBC to Github

    NARCIS (Netherlands)

    Roorda, Dirk

    2017-01-01

    This pipeline delivers, among other good things, a file bhsa_xx.mql.bz2 which contains all ETCBC data and research additions to it. The form is MQL, compressed, and the size is less than 30 MB. Where ever you have Emdros installed, you can query this data. If you take this file from the continuous

  15. pipelines cathodic protection design methodologies for impressed ...

    African Journals Online (AJOL)

    HOD

    Several inadequate designs of cathodically polarized offshore and onshore pipelines have been reported in Nigeria owing to design complexity and application of the cathodic protection system. The present study focused on critical and detailed approach in impressed current and sacrificial anode design calculation ...

  16. Modeling and monitoring of pipelines and networks advanced tools for automatic monitoring and supervision of pipelines

    CERN Document Server

    Torres, Lizeth

    2017-01-01

    This book focuses on the analysis and design of advanced techniques for on-line automatic computational monitoring of pipelines and pipe networks. It discusses how to improve the systems’ security considering mathematical models of the flow, historical flow rate and pressure data, with the main goal of reducing the number of sensors installed along a pipeline. The techniques presented in the book have been implemented in digital systems to enhance the abilities of the pipeline network’s operators in recognizing anomalies. A real leak scenario in a Mexican water pipeline is used to illustrate the benefits of these techniques in locating the position of a leak. Intended for an interdisciplinary audience, the book addresses researchers and professionals in the areas of mechanical, civil and control engineering. It covers topics on fluid mechanics, instrumentation, automatic control, signal processing, computing, construction and diagnostic technologies.

  17. INNOVATIVE ELECTROMAGNETIC SENSORS FOR PIPELINE CRAWLERS

    Energy Technology Data Exchange (ETDEWEB)

    J. Bruce Nestleroth

    2004-11-05

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they encounter. Recent development efforts include a new generation of powered inspection platforms that crawl slowly inside a pipeline and are able to maneuver past the physical barriers that can limit inspection. At Battelle, innovative electromagnetic sensors are being designed and tested for these new pipeline crawlers. The various sensor types can be used to assess a wide range of pipeline anomalies including corrosion, mechanical damage, and cracks. The Applied Energy Systems Group at Battelle is concluding the first year of work on a projected three-year development effort. In this first year, two innovative electromagnetic inspection technologies were designed and tested. Both were based on moving high-strength permanent magnets to generate inspection energy. One system involved translating permanent magnets towards the pipe. A pulse of electric current would be induced in the pipe to oppose the magnetization according to Lenz's Law. The decay of this pulse would indicate the presence of defects in the pipe wall. This inspection method is similar to pulsed eddy current inspection methods, with the fundamental difference being the manner in which the current is generated. Details of this development effort were reported in the first semiannual report on this project. This second semiannual report focuses on the development of a second inspection methodology, based on rotating permanent magnets. During this period, a rotating permanent magnet exciter was designed and built. The exciter unit produces strong eddy currents in the pipe wall. The tests have shown that at distances of a pipe diameter or more, the currents flow circumferentially, and that these circumferential

  18. INNOVATIVE ELECTROMAGNETIC SENSORS FOR PIPELINE CRAWLERS

    Energy Technology Data Exchange (ETDEWEB)

    J. Bruce Nestleroth

    2005-11-30

    Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they encounter. Recent development efforts include a new generation of powered inspection platforms that crawl slowly inside a pipeline and are able to maneuver past the physical barriers that can limit inspection. At Battelle, innovative electromagnetic sensors are being designed and tested for these new pipeline crawlers. The various sensor types can be used to assess a wide range of pipeline anomalies including corrosion, mechanical damage, and cracks. Battelle has completed the second year of work on a projected three-year development effort. In the first year, two innovative electromagnetic inspection technologies were designed and tested. Both were based on moving high-strength permanent magnets to generate inspection energy. One system involved translating permanent magnets towards the pipe. A pulse of electric current would be induced in the pipe to oppose the magnetization according to Lenz's Law. The decay of this pulse would indicate the presence of defects in the pipe wall. This inspection method is similar to pulsed eddy current inspection methods, with the fundamental difference being the manner in which the current is generated. Details of this development effort were reported in the first semiannual report on this project. The second inspection methodology is based on rotating permanent magnets. The rotating exciter unit produces strong eddy currents in the pipe wall. At distances of a pipe diameter or more from the rotating exciter, the currents flow circumferentially. These circumferential currents are deflected by pipeline defects such as corrosion and axially aligned cracks. Simple sensors are used to detect the change in current densities in the pipe wall

  19. Methodology for environmental audit of execution in gas-pipelines and pipelines

    International Nuclear Information System (INIS)

    Hurtado Palomino, Maria Patricia; Vargas Bejarano, Carlos Hernando

    1999-01-01

    In first instance the constructive aspects and the environmental impact related with the gas-pipes and pipelines construction are presented; then a methodology to make the environmental audit of execution in gas-pipes and pipelines, is showed. They contemplate four stages basically: planning, pre-auditory, execution and analysis, and post-auditory with their respective activities. Also, it is given to know, generalities of the practical case, to evaluate the applicability of the proposed methodology

  20. The Bakou-Ceyhan pipeline: paradoxes and coherence of the USA strategy of pipelines

    International Nuclear Information System (INIS)

    Jafalian, A.

    2004-01-01

    In 2002, the construction of the Bakou-Ceyhan pipeline, from the Caspian Sea to the Mediterranean Sea, is begun, in spite of the the controversies of industrialists against politicians and experts. The diplomatic USA activity in favor this pipeline largely contributes to the problems solution. The author presents the USA policy and strategy in the region, the economic constraints and the negotiations. (A.L.B.)

  1. Energy cost reduction in oil pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Limeira, Fabio Machado; Correa, Joao Luiz Lavoura; Costa, Luciano Macedo Josino da; Silva, Jose Luiz da; Henriques, Fausto Metzger Pessanha [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    One of the key questions of modern society consists on the rational use of the planet's natural resources and energy. Due to the lack of energy, many companies are forced to reduce their workload, especially during peak hours, because residential demand reaches its top and there is not enough energy to fulfill the needs of all users, which affects major industries. Therefore, using energy more wisely has become a strategic issue for any company, due to the limited supply and also for the excessive cost it represents. With the objective of saving energy and reducing costs for oil pipelines, it has been identified that the increase in energy consumption is primordially related to pumping stations and also by the way many facilities are operated, that is, differently from what was originally designed. Realizing this opportunity, in order to optimize the process, this article intends to examine the possibility of gains evaluating alternatives regarding changes in the pump scheme configuration and non-use of pump stations at peak hours. Initially, an oil pipeline with potential to reduce energy costs was chosen being followed by a history analysis, in order to confirm if there was sufficient room to change the operation mode. After confirming the pipeline choice, the system is briefly described and the literature is reviewed, explaining how the energy cost is calculated and also the main characteristics of a pumping system in series and in parallel. In that sequence, technically feasible alternatives are studied in order to operate and also to negotiate the energy demand contract. Finally, costs are calculated to identify the most economical alternative, that is, for a scenario with no increase in the actual transported volume of the pipeline and for another scenario that considers an increase of about 20%. The conclusion of this study indicates that the chosen pipeline can achieve a reduction on energy costs of up to 25% without the need for investments in new

  2. Alliance Pipeline: opening doors for gas

    International Nuclear Information System (INIS)

    Edgeworth, A.

    2000-01-01

    An update on the status of the Alliance Pipeline, a regulated, high-pressure, rich-gas pipeline from northeastern British Columbia and northwest Alberta to the Chicago Hub, is provided. The mainline length of the pipeline is 2988 kms, with laterals of 698 kms. There are 14 mainline compressor stations; the maximum operating pressure is 1740 psi. The initial firm delivery contract capacity is 1.325 Bcfd; the line has 15-year shipping commitments of 1.3 Bcfd. As of Sept 26, 2000, all 36-inch and 42-inch pipe has been installed; only a 45 kms section of 4-inch to 24-inch lateral line remains to be installed. There are five receiving points in British Columbia and 32 in Alberta. U.S. demand for natural gas has grown 17.5 per cent during the past decade; further growth in demand of 20 per cent to 27 per cent is expected during the next decade. Canada's share of supplying North American demand has grown from 16 per cent to 25 per cent during the 1990s, and since Canada will have excess pipeline capacity of 1.5 to 2.0 Bcfd in the short-term, consequently, depending on market demand, Alliance Pipeline can provide a low-cost expansion option to further increase in Western Canada's share of the growing U.S. markets. The natural gas potential of Western Canada is considered to be substantial; development of this potential is dependent on low cost transportation and market/price signals

  3. Neutron backscattered application in investigation for Pipeline Intelligent Gauge (PIG) tracking in RAYMINTEX matrix pipeline

    International Nuclear Information System (INIS)

    Mohd Fakarudin Badul Rahman; Ismail Mustapha; Nor Paiza Mohd Hasan; Pairu Ibrahim; Airwan Affandi Mahmood; Mior Ahmad Khusaini Adnan; Najib Mohammed Zakey

    2012-01-01

    The Radiation Vulcanized Natural Rubber Latex (RVNRL) process plants such RAYMINTEX, pipelines are used extensively to transfer a latex product from storage vessel and being irradiated to produce a high quality of latex. A hydraulically activated Pipeline Intelligent Gauge (PIG) was held back against the latex flow. Consequently, the stuck PIG in pipeline was subjected to interrupt plant operation. The investigation was carried out using the neutron backscattered technique scanner to track the stuck PIG in pipeline of RVNRL plant. The 50 mCi Americium Beryllium (AmBe 241 ) fast neutron emitter source in the range 0.5-11 MeV has been used and thermal neutrons in the 30 eV- 0.5 MeV was detected using Helium-3 (He 3 ) detector. It is observed that there is unambiguous relationship between vapour and RVNRL consequence of diverse hydrogen concentration in pipeline. Thus, neutron backscattered technique was capable to determine the location of stuck PIG in a RVNRL pipeline. (author)

  4. Managing the market risk in pipeline capacity positions

    International Nuclear Information System (INIS)

    Simard, T.S.

    1998-01-01

    Managing the risk involved in adding new pipeline capacity was explored in this presentation. Topics discussed included: (1) pipeline capacity positions as basis swaps, (2) physical capacity versus basis transactions, (3) managing the market price risk in a capacity position, and (4) sharing of pipeline market risk. Pipeline owners were advised to recognize that pipeline capacity carries significant market price risk, that basis markets can sometimes be more volatile than outright markets, and to treat physical capacity market risk the same way as one would treat a financial basis position. 2 figs

  5. Accelerating resistance, inadequate antibacterial drug pipelines and international responses.

    Science.gov (United States)

    Theuretzbacher, Ursula

    2012-04-01

    The pandemic of multidrug-resistant (MDR) pathogens and their continuing spread is beyond dispute. In contrast to the past, today's antibacterial research and development (R&D) pipelines are nearly dry, failing to provide the flow of novel antibiotics required to match the clinical challenges of the multidrug resistance (MDR) crisis. Concerned over the rapidly worsening potential global healthcare crisis caused by MDR bacteria and the lack of robust drug pipelines, several multinational campaigns have issued policy recommendations and have initiated broad discussion with a goal of stimulating the development of novel antibacterial drugs and technologies. These activities have resulted in intensified co-operation between the USA and the EU. The recently announced extensive 'Action plan against the rising threats from antimicrobial resistance' substantially ramps up action within the EU. In recognising the potential crisis caused by MDR and the limited treatment options, the European Commission decided on an unprecedented approach to drive the search for novel antibiotics by integrating the pharmaceutical industry, the research capacities of universities and small companies supported by public funding along with pricing/reimbursement and regulatory bodies. The European Commission has shown leadership and put action plans in place. Only the future will tell whether these initiatives will help curb the impact of the MDR pandemic. Copyright © 2012 Elsevier B.V. and the International Society of Chemotherapy. All rights reserved.

  6. Pipeline corrosion assessment using embedded Fiber Bragg grating sensors

    Science.gov (United States)

    Liang, Xiao; Huang, Ying; Galedari, Sahar Abuali; Azarmi, Fardad

    2015-04-01

    Corrosion is a leading cause of failure in metallic transmission pipelines. It significantly impacts the reliability and safety of metallic pipelines. An accurate assessment of corrosion status of the pipelines would contribute to timely pipeline maintenance and repair and extend the service life of the associated pipelines. To assess pipeline corrosion, various technologies have been investigated and the pipe-to-soil voltage potential measurement was commonly applied. However, remote and real-time corrosion assessment approaches are in urgent needs but yet achieved. Fiber optic sensors, especially, fiber Bragg gating (FBG) sensors, with unique advantages of real-time sensing, compactness, immune to EMI and moisture, capability of quasi-distributed sensing, and long life cycle, will be a perfect candidate for longterm pipeline corrosion assessment. In this study, FBG sensors are embedded inside pipeline external coating for corrosion monitoring of on-shore buried metallic transmission pipelines. Detail sensing principle, sensor calibration and embedment are introduced in this paper together with experimental corrosion evaluation testing ongoing. Upon validation, the developed sensing system could serve the purpose of corrosion monitoring to the numerous metallic pipelines across nation and would possibly reduce the pipeline corrosion induced tragedies.

  7. Living and working near pipelines : Landowner guide 2002

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    The transportation of natural gas, oil and other commodities is effected by pipelines throughout most of the country. Safety in the vicinity of a pipeline is very important because damage to a pipeline could result in adverse conditions to public safety and/or the environment. Before digging, written approval must be obtained from the pipeline company. If a landowner is having difficulty negotiating an agreement with the pipeline company, they should call the National Energy Board. It is illegal to construct or excavate without authorization, and approval or denial of a request must be granted within 10 business days by the pipeline company. Three days are allowed to the pipeline company to locate its pipeline. A section dealing with pipeline right-of-way is included, as well as the safety zone and the restricted area. A 10-step checklist of safety tips assists the landowner in taking the appropriate measures in the vicinity of a pipeline. A brief overview of the responsibilities of the National Energy Board is provided, followed by a list of the main pipelines regulated by the National Energy Board. 2 figs

  8. Developing eThread Pipeline Using SAGA-Pilot Abstraction for Large-Scale Structural Bioinformatics

    Directory of Open Access Journals (Sweden)

    Anjani Ragothaman

    2014-01-01

    Full Text Available While most of computational annotation approaches are sequence-based, threading methods are becoming increasingly attractive because of predicted structural information that could uncover the underlying function. However, threading tools are generally compute-intensive and the number of protein sequences from even small genomes such as prokaryotes is large typically containing many thousands, prohibiting their application as a genome-wide structural systems biology tool. To leverage its utility, we have developed a pipeline for eThread—a meta-threading protein structure modeling tool, that can use computational resources efficiently and effectively. We employ a pilot-based approach that supports seamless data and task-level parallelism and manages large variation in workload and computational requirements. Our scalable pipeline is deployed on Amazon EC2 and can efficiently select resources based upon task requirements. We present runtime analysis to characterize computational complexity of eThread and EC2 infrastructure. Based on results, we suggest a pathway to an optimized solution with respect to metrics such as time-to-solution or cost-to-solution. Our eThread pipeline can scale to support a large number of sequences and is expected to be a viable solution for genome-scale structural bioinformatics and structure-based annotation, particularly, amenable for small genomes such as prokaryotes. The developed pipeline is easily extensible to other types of distributed cyberinfrastructure.

  9. Developing eThread pipeline using SAGA-pilot abstraction for large-scale structural bioinformatics.

    Science.gov (United States)

    Ragothaman, Anjani; Boddu, Sairam Chowdary; Kim, Nayong; Feinstein, Wei; Brylinski, Michal; Jha, Shantenu; Kim, Joohyun

    2014-01-01

    While most of computational annotation approaches are sequence-based, threading methods are becoming increasingly attractive because of predicted structural information that could uncover the underlying function. However, threading tools are generally compute-intensive and the number of protein sequences from even small genomes such as prokaryotes is large typically containing many thousands, prohibiting their application as a genome-wide structural systems biology tool. To leverage its utility, we have developed a pipeline for eThread--a meta-threading protein structure modeling tool, that can use computational resources efficiently and effectively. We employ a pilot-based approach that supports seamless data and task-level parallelism and manages large variation in workload and computational requirements. Our scalable pipeline is deployed on Amazon EC2 and can efficiently select resources based upon task requirements. We present runtime analysis to characterize computational complexity of eThread and EC2 infrastructure. Based on results, we suggest a pathway to an optimized solution with respect to metrics such as time-to-solution or cost-to-solution. Our eThread pipeline can scale to support a large number of sequences and is expected to be a viable solution for genome-scale structural bioinformatics and structure-based annotation, particularly, amenable for small genomes such as prokaryotes. The developed pipeline is easily extensible to other types of distributed cyberinfrastructure.

  10. Pipeline operators training and certification using thermohydraulic simulators

    Energy Technology Data Exchange (ETDEWEB)

    Barreto, Claudio V.; Plasencia C, Jose [Pontificia Universidade Catolica (PUC-Rio), Rio de Janeiro, RJ (Brazil). Nucleo de Simulacao Termohidraulica de Dutos (SIMDUT); Montalvao, Filipe; Costa, Luciano [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The continuous pipeline operators training and certification of the TRANSPETRO's Pipeline National Operations Control Center (CNCO) is an essential task aiming the efficiency and safety of the oil and derivatives transport operations through the Brazilian pipeline network. For this objective, a hydraulic simulator is considered an excellent tool that allows the creation of different operational scenarios for training the pipeline hydraulic behavior as well as for testing the operator's responses to normal and abnormal real time operational conditions. The hydraulic simulator is developed based on a pipeline simulation software that supplies the hydraulic responses normally acquired from the pipeline remote units in the field. The pipeline simulation software has a communication interface system that sends and receives data to the SCADA supervisory system database. Using the SCADA graphical interface to create and to customize human machine interfaces (HMI) from which the operator/instructor has total control of the pipeline/system and instrumentation by sending commands. Therefore, it is possible to have realistic training outside of the real production systems, while acquiring experience during training hours with the operation of a real pipeline. A pilot Project was initiated at TRANSPETRO - CNCO targeting to evaluate the hydraulic simulators advantages in pipeline operators training and certification programs. The first part of the project was the development of three simulators for different pipelines. The excellent results permitted the project expansion for a total of twenty different pipelines, being implemented in training programs for pipelines presently operated by CNCO as well as for the new ones that are being migrated. The main objective of this paper is to present an overview of the implementation process and the development of a training environment through a pipe simulation environment using commercial software. This paper also presents

  11. Pipelines to power South East Asia

    International Nuclear Information System (INIS)

    Scholes, W.

    1994-01-01

    European, North American and Australian pipeline companies are busy building pipelines to transport natural gas to power stations throughout South East Asia. Many countries, such as Thailand, Malaysia, Singapore and Indonesia, have economies expanding at more than eight percent a year. Cambodia and Laos are awaiting energy development. Myanmar will not only benefit from the global economic expansion but from the flourishing economies of nearby Thailand and Malaysia which are now investing in neighbouring countries, while their national petroleum companies are starting to operate worldwide. It is the ever expanding rush of industrialisation, urbanisation and the move to raise living standards throughout the region that is accelerating the need for more power stations, both gas and coal-fired, throughout South East Asia. (author)

  12. Development of an automatic pipeline scanning system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae H.; Lee, Jae C.; Moon, Soon S.; Eom, Heung S.; Choi, Yu R

    1999-11-01

    Pressure pipe inspection in nuclear power plants is one of the mandatory regulation items. Comparing to manual ultrasonic inspection, automatic inspection has the benefits of more accurate and reliable inspection results and reduction of radiation disposal. final object of this project is to develop an automatic pipeline inspection system of pressure pipe welds in nuclear power plants. We developed a pipeline scanning robot with four magnetic wheels and 2-axis manipulator for controlling ultrasonic transducers, and developed the robot control computer which controls the robot to navigate along inspection path exactly. We expect our system can contribute to reduction of inspection time, performance enhancement, and effective management of inspection results. The system developed by this project can be practically used for inspection works after field tests. (author)

  13. Sensor network architectures for monitoring underwater pipelines.

    Science.gov (United States)

    Mohamed, Nader; Jawhar, Imad; Al-Jaroodi, Jameela; Zhang, Liren

    2011-01-01

    This paper develops and compares different sensor network architecture designs that can be used for monitoring underwater pipeline infrastructures. These architectures are underwater wired sensor networks, underwater acoustic wireless sensor networks, RF (radio frequency) wireless sensor networks, integrated wired/acoustic wireless sensor networks, and integrated wired/RF wireless sensor networks. The paper also discusses the reliability challenges and enhancement approaches for these network architectures. The reliability evaluation, characteristics, advantages, and disadvantages among these architectures are discussed and compared. Three reliability factors are used for the discussion and comparison: the network connectivity, the continuity of power supply for the network, and the physical network security. In addition, the paper also develops and evaluates a hierarchical sensor network framework for underwater pipeline monitoring.

  14. Automatic pipeline operation using Petri Nets

    Energy Technology Data Exchange (ETDEWEB)

    Moreira, Guilherme O. [PETROBRAS TRANSPORTE S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    A pipeline operation requires several actions, attention and time from the control room operator in each of its operating phases. This article proposition is to use automation as something more than a remote control, drastically reducing the number of repetitive and routine actions needed from the operator to start and stop the system, granting more time for system supervision, decision making during critical conditions and avoiding errors caused due to the need of several actions being executed in a short period of time. To achieve these objectives the pipeline operation will be modeled as a Petri Net consisting of states, event and actions. A methodology for converting this Petri Net into a Ladder controller code will also be proposed. (author)

  15. Pipelines explosion, violates Humanitarian International Right

    International Nuclear Information System (INIS)

    Carta Petrolera

    1997-01-01

    Recently and for first time, an organism of the orbit of the human rights put the finger in the wound of the problem that represents for Colombia the pipelines explosion and the social and environmental impact that those actions in this case the Defense of the People office, the institution that published a document related this denounces, in the one that sustains that the country it cannot continue of back with a serious and evident reality as the related with the explosions of pipelines. We are the only country of the world where happen these facts and enormous losses are not only causing to the Colombian economy, but rather our environmental wealth is affecting, the document, denounced the ignorance of the humanitarian international right on the part of those who apply to that class of attacks

  16. Key Design Properties for Shipping Information Pipeline

    DEFF Research Database (Denmark)

    Jensen, Thomas; Tan, Yao-Hua

    2015-01-01

    on paper, e-mail, phone and text message, and far too costly. This paper explores the design properties for a shared information infrastructure to exchange information between all parties in the supply chain, commercial parties as well as authorities, which is called a Shipping Information Pipeline...... Infrastructures. The paper argues why the previous attempts are inadequate to address the issues in the domain of international supply chains. Instead, a different set of key design properties are proposed for the Shipping Information Pipeline. The solution has been developed in collaboration with a network......This paper reports on the use of key design properties for development of a new approach towards a solution for sharing shipping information in the supply chain for international trade. Information exchange in international supply chain is extremely inefficient, rather uncoordinated, based largely...

  17. Homology Groups of a Pipeline Petri Net

    Directory of Open Access Journals (Sweden)

    A. A. Husainov

    2013-01-01

    Full Text Available Petri net is said to be elementary if every place can contain no more than one token. In this paper, it is studied topological properties of the elementary Petri net for a pipeline consisting of n functional devices. If the work of the functional devices is considered continuous, we can come to some topological space of “intermediate” states. In the paper, it is calculated the homology groups of this topological space. By induction on n, using the Addition Sequence for homology groups of semicubical sets, it is proved that in dimension 0 and 1 the integer homology groups of these nets are equal to the group of integers, and in the remaining dimensions are zero. Directed homology groups are studied. A connection of these groups with deadlocks and newsletters is found. This helps to prove that all directed homology groups of the pipeline elementary Petri nets are zeroth.

  18. Leadership pipeline i den offentlige sektor

    DEFF Research Database (Denmark)

    Dahl, Kristian Aagaard; Molly-Søholm, Thorkil

    en rejse ind i hjertet af offentlig ledelse med fokus på lederniveauerne: topchef, funktionel chef, leder af ledere og leder af medarbejdere. Med afsæt i righoldige eksempler og fortællinger fra virkeligheden introduceres læseren for ledelsesteorien den Offentlige Leadership Pipeline, som giver...... enkelte lederniveauer og udvikle ledertalenter. Teorien byder på et detaljeret ledelsesgrundlag, hvorudfra den offentlige organisation kan bygge en professionel værdikæde for ledelse ved at forme lederprofiler, -rekruttering, -uddannelse, -evaluering m.m. Leadership Pipeline i den offentlige sektor er...... baseret på et treårigt dansk praksisorienteret forskningsprojekt med deltagelse af 15 offentlige organisationer, som repræsenterer kommunerne, regionerne og staten. Projektet har videreudviklet en af de sidste 10 års mest indflydelsesrige ledelseteorier i de største private organisationer, Leadership...

  19. Pipelines, utilities plan over 150 scada systems

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that North American pipelines and utilities will spend more than $170 million on new or upgraded supervisory control and data acquisition (scada) systems during the 30-month period that commenced Sept. 1. Another $12.5 million will be spent on peripherals and consulting. Among the 699 various projects to be implemented during the period, companies will install 151 scada systems, add 154 remote-terminal units (RTUs) to existing scada units, and install 196 communications systems. Scada systems are computerized hardware and software systems that perform a set of monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  20. Pipeline corridors through wetlands - impacts on plant communities: Deep Creek and Brandy Branch crossings, Nassau County, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E.

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of surveys conducted July 14-18, 1992, at the Deep Creek and the Brandy Branch crossings of a pipeline installed during May 1991 in Nassau County, Florida. Both floodplains supported bottomland hardwood forests. The pipeline at the Deep Creek crossing was installed by means of horizontal directional drilling after the ROW had been clear-cut, while the pipeline at the Brandy Branch crossing was installed by means of conventional open trenching. Neither site was seeded or fertilized. At the time of sampling, a dense vegetative community, made up primarily of native perennial herbaceous species, occupied the ROW within the Deep Creek floodplain. The Brandy Branch ROW was vegetated by a less dense stand of primarily native perennial herbaceous plants. Plant diversity was also lower at the Brandy Branch crossing than at the Deep Creek crossing. The results suggest that some of the differences in plant communities are related to the more hydric conditions at the Brandy Branch floodplain.

  1. Desain Layout 1-Stage ADC Pipeline 80Msps dengan Mentor Graphics 0,35µm untuk Aplikasi Kamera Kecepatan Tinggi

    Directory of Open Access Journals (Sweden)

    Hamzah Afandi

    2012-10-01

    Full Text Available Design layout 1-stage pipeline is part of the 8-stage pipeline 80 Msps ADC. Layout 1-stage pipeline consists of 3 units : op-amp, switch capacitor, precision comparator with latch. Pipeline ADC works gradually and requires synchronization of digital output 8 stage by using a unit delay circuit (D-FF. Pipeline ADC requires pulse rate (clockgenerator to support its work. Units OP-AMP transconductance CMOS components designed with the correct specification ADC applications with capacitive loads, with a large input impedance and minimize noise. The precision comparator has Vos(offset voltage approximately equal to 0V. The capacitor switch designs use NMOS switch as a switch for the sampling and multiplying. In the sampling phase and multiplying processes, the ADC requires a clock pulse with a non-intersect mode (lapping. The width of non-overlapping period was adjusted to the time of constance in the sampling process and multiplying. The total number of each pulse period equal to 12.5 ns or equal to the frequency of 80MHz. In the 1-stage layout an additional correction capacitor was required to correct residual voltage. The total area of the layout 1-stage pipeline ADC is 1-bit 200 μm x 98μm.

  2. Cogeneration: A marketing opportunity for pipelines

    International Nuclear Information System (INIS)

    Ulrich, J.S.

    1992-01-01

    This chapter describes the marketing of dual-purpose power plants by pipeline companies as a long term marketing strategy for natural gas. The author uses case studies to help evaluate a company's attitude toward development of a market for cogeneration facilities. The chapter focuses on strategies for developing markets in the industrial sector and identifying customer groups that are likely to respond in like manner to a marketing strategy

  3. Performance of MSGC with analog pipeline readout

    Energy Technology Data Exchange (ETDEWEB)

    Gomez, F. [Universidad de Santiago de Compostela (Spain); Adeva, B. [Universidad de Santiago de Compostela (Spain); Gracia, G. [Universidad de Santiago de Compostela (Spain); Lopez, M.A. [Universidad de Santiago de Compostela (Spain); Nunez, T. [Universidad de Santiago de Compostela (Spain); Pazos, A. [Universidad de Santiago de Compostela (Spain); Plo, M. [Universidad de Santiago de Compostela (Spain); Rodriguez, A. [Universidad de Santiago de Compostela (Spain); Santamarina, C. [Universidad de Santiago de Compostela (Spain); Vazquez, P. [Universidad de Santiago de Compostela (Spain)

    1997-01-01

    We analyse some of the performance characteristics of a chromium MSGC operated with Ar-DME 50%-50% in a test beam at CERN. Excellent signal-to-noise ratio and efficiency has been achieved with this gas mixture using cathode analog pipeline readout. We also determine optimal parameters for the sampling algorithm in order to work in a random trigger experiment (fixed target). (orig.).

  4. Performance of MSGC with analog pipeline readout

    International Nuclear Information System (INIS)

    Gomez, F.; Adeva, B.; Gracia, G.; Lopez, M.A.; Nunez, T.; Pazos, A.; Plo, M.; Rodriguez, A.; Santamarina, C.; Vazquez, P.

    1997-01-01

    We analyse some of the performance characteristics of a chromium MSGC operated with Ar-DME 50%-50% in a test beam at CERN. Excellent signal-to-noise ratio and efficiency has been achieved with this gas mixture using cathode analog pipeline readout. We also determine optimal parameters for the sampling algorithm in order to work in a random trigger experiment (fixed target). (orig.)

  5. BALBES: a molecular-replacement pipeline

    OpenAIRE

    Long, Fei; Vagin, Alexei A.; Young, Paul; Murshudov, Garib N.

    2007-01-01

    The number of macromolecular structures solved and deposited in the Protein Data Bank (PDB) is higher than 40?000. Using this information in macromolecular crystallo?graphy (MX) should in principle increase the efficiency of MX structure solution. This paper describes a molecular-replacement pipeline, BALBES, that makes extensive use of this repository. It uses a reorganized database taken from the PDB with multimeric as well as domain organization. A system manager written in Python controls...

  6. Optimizing the TESS Planet Finding Pipeline

    Science.gov (United States)

    Chitamitara, Aerbwong; Smith, Jeffrey C.; Tenenbaum, Peter; TESS Science Processing Operations Center

    2017-10-01

    The Transiting Exoplanet Survey Satellite (TESS) is a new NASA planet finding all-sky survey that will observe stars within 200 light years and 10-100 times brighter than that of the highly successful Kepler mission. TESS is expected to detect ~1000 planets smaller than Neptune and dozens of Earth size planets. As in the Kepler mission, the Science Processing Operations Center (SPOC) processing pipeline at NASA Ames Research center is tasked with calibrating the raw pixel data, generating systematic error corrected light curves and then detecting and validating transit signals. The Transiting Planet Search (TPS) component of the pipeline must be modified and tuned for the new data characteristics in TESS. For example, due to each sector being viewed for as little as 28 days, the pipeline will be identifying transiting planets based on a minimum of two transit signals rather than three, as in the Kepler mission. This may result in a significantly higher false positive rate. The study presented here is to measure the detection efficiency of the TESS pipeline using simulated data. Transiting planets identified by TPS are compared to transiting planets from the simulated transit model using the measured epochs, periods, transit durations and the expected detection statistic of injected transit signals (expected MES). From the comparisons, the recovery and false positive rates of TPS is measured. Measurements of recovery in TPS are then used to adjust TPS configuration parameters to maximize the planet recovery rate and minimize false detections. The improvements in recovery rate between initial TPS conditions and after various adjustments will be presented and discussed.

  7. Estimation of efficiency of hydrotransport pipelines polyurethane coating application in comparison with steel pipelines

    Science.gov (United States)

    Aleksandrov, V. I.; Vasilyeva, M. A.; Pomeranets, I. B.

    2017-10-01

    The paper presents analytical calculations of specific pressure loss in hydraulic transport of the Kachkanarsky GOK iron ore processing tailing slurry. The calculations are based on the results of the experimental studies on specific pressure loss dependence upon hydraulic roughness of pipelines internal surface lined with polyurethane coating. The experiments proved that hydraulic roughness of polyurethane coating is by the factor of four smaller than that of steel pipelines, resulting in a decrease of hydraulic resistance coefficients entered into calculating formula of specific pressure loss - the Darcy-Weisbach formula. Relative and equivalent roughness coefficients are calculated for pipelines with polyurethane coating and without it. Comparative calculations show that hydrotransport pipelines polyurethane coating application is conductive to a specific energy consumption decrease in hydraulic transport of the Kachkanarsky GOC iron ore processing tailings slurry by the factor of 1.5. The experiments were performed on a laboratory hydraulic test rig with a view to estimate the character and rate of physical roughness change in pipe samples with polyurethane coating. The experiments showed that during the following 484 hours of operation, roughness changed in all pipe samples inappreciably. As a result of processing of the experimental data by the mathematical statistics methods, an empirical formula was obtained for the calculation of operating roughness of polyurethane coating surface, depending on the pipeline operating duration with iron ore processing tailings slurry.

  8. Maintenance optimization for subsea oil pipelines

    International Nuclear Information System (INIS)

    Castanier, Bruno; Rausand, Marvin

    2006-01-01

    In this paper, the classical PF interval model, proposed for reliability centered maintenance, is used to optimize the preventive replacement policy of a subsea oil pipeline. The pipeline is subject to failure modes that may lead to oil release and pollution of the sea. The proposed replacement policy is based on regular condition measurements of the quality of an internal pipeline coating (lining). Holes in the coating will expose the pipe material (steel) to a corrosive environment. It is, therefore, important to identify holes in the coating and take action before the corrosion penetrates the pipe wall. The model proposed in the paper can be used to determine the inspection interval that minimizes the average maintenance cost per time unit. The model formulation is outlined and illustrative examples are solved. The mathematical evaluation of the replacement policy requires numerous assumptions. These assumptions have to be tailored to the specific application. The assumptions and the data provided are included for illustrative purposes to exemplify potential results that may be obtained by using the replacement policy

  9. Instruction issue logic in pipelined supercomputers

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, S.; Smith, J.E.

    1984-11-01

    Basic principles and design tradeoffs for control of pipelined processors are first discussed. We concentrate on register-register architectures like the CRAY-1 where pipeline control logic is localized to one or two pipeline stages and is referred to as ''instruction issue logic.'' Design tradeoffs are explored by giving designs for a variety of instruction issue methods that represent a range of complexity and sophistication. These vary from the CRAY-1 issue logic to a version of Tomasulo's algorithm, first used in the IBM 360/91 floating point unit. Also studied are Thornton's ''scoreboard'' algorithm used on the CDC 6600 and an algorithm we have devised. To provide a standard for comparison, all the issue methods are used to implement the CRAY-1 scalar architecture. Then, using a simulation model and the Lawrence Livermore Loops compiled with the CRAY Fortran compiler, performance results for the various issue methods are given and discussed.

  10. US DOE Pipeline Unplugging Requirements Development

    International Nuclear Information System (INIS)

    Rivera, J.; McDaniel, D.

    2009-01-01

    Department of Energy (DOE) sites around the country have an ongoing effort to transport and process several tons of radioactive waste in the form of slurry (liquids and solids) from storage tanks to processing facilities. The system of pipes used for the transportation of this waste needs technology for maintenance and for the prevention (and correction) of pipeline plugging. The unplugging technologies that have been tested and evaluated at Florida International University include ones from NuVision Engineering, AIMM and AquaMiser. NuVision's technology acts as an ocean wave does on beach erosion. It can operate on a long pipeline that has drained down below a blockage. AIMM Technology's Hydrokinetic TM process uses a sonic resonance with a cleaning water stream. This sonic resonance travels through the water stream and transfers vibration to both the pipe and the blockage. The AquaMiser line of water blasting equipment combines 15,000- to 40,000-psi water injection technology to unplug pipelines. Some sites cannot allow this level of pressure in their pipes. After reviewing the results of every test, including the benefits, advantages and disadvantages of each technology, requirements were developed for pressure, personnel training, environmental concerns, safety, and compatibility with current systems, operability, reliability, maintainability and cost. (authors)

  11. Pipeline leak detection using volatile tracers

    International Nuclear Information System (INIS)

    Thompson, G.M.; Golding, R.D.

    1993-01-01

    A method of leak detection for underground storage tanks and pipelines adds volatile tracers to the products in the tanks and analyzes the surrounding shallow soil gases for tracer vapors. This method has several advantages: the success of the test is not limited by the size and structural design of the vessels, tanks can be tested at any fill level without taking the tank out of service, the location of a leak along a pipeline is clearly marked by the location of the tracer, and liquid leaks as small as 0.2 liters per hour (lph) can be detected. A limitation is: the backfill material must have some degree of air permeability in the zone above the water table. Several field tests document the success achieved using this method. A tracer leak detection system was installed at Homestead AFB after several other testing methods failed to locate a leak at a valve pit location along approximately 4 kilometers of fuel transfer piping. The leak was detected to the side of the valve pit at a depth of approximately 2.5 meters below the ground surface. Another installation of Edwards AFB involved the collection of 415 soil gas samples along approximately 3,050 meters of 15.25-centimeter fiberglass pipeline. Fourteen separate leaks were detected

  12. KENYA’S OIL PIPELINE AND TERRORISM

    Directory of Open Access Journals (Sweden)

    E.O.S.ODHIAMBO

    2014-04-01

    Full Text Available The threat of Al-Shabaab and Al-Qaeda terrorist attacks on the critical infrastructure (oil pipeline in Kenya has brought to the attention the strategic issue of the energy sector security, highlighting the potential vulnerabilities of this sector. Critical Infrastructure Protection (CIP should be a key component of the national security especially after the Kenya Defence Forces’ (KDF incursion into Somalia. The merger of Al-Shabaab and Al-Qaeda terrorist groups and the accelerated grenades attack against Kenya in retaliation has become the centre of the debate on terrorism and internal security of the Kenya. The energy resources are strategic assets from the security, political and economic point of view. Kenya as an oil transit country is considered of primary strategic importance at international level. International terrorism has always looked with interest at the oil resource in order to meet its political and economic targets. We argue that Kenya’s oil pipelines are vulnerable to Al-Shabaab and Al-Qaeda terrorist attack. In summary, the article looks at the concept of terrorism within the framework of critical infrastructure protection, the dangers of attacks on oil pipelines, Kenya’s government preparedness and recommendations.

  13. Comb to Pipeline: Fast Software Encryption Revisited

    DEFF Research Database (Denmark)

    Bogdanov, Andrey; Lauridsen, Martin Mehl; Tischhauser, Elmar Wolfgang

    2015-01-01

    AES-NI, or Advanced Encryption Standard New Instructions, is an extension of the x86 architecture proposed by Intel in 2008. With a pipelined implementation utilizing AES-NI, parallelizable modes such as AES-CTR become extremely efficient. However, out of the four non-trivial NIST-recommended enc......AES-NI, or Advanced Encryption Standard New Instructions, is an extension of the x86 architecture proposed by Intel in 2008. With a pipelined implementation utilizing AES-NI, parallelizable modes such as AES-CTR become extremely efficient. However, out of the four non-trivial NIST...... look-ahead strategy, featuring a low overhead – with which sequential modes profit from the AES-NI pipeline in real-world settings by filling it with multiple, independent messages. We apply the comb scheduler to implementations on Haswell, Intel’s latest microarchitecture, for a wide range of modes...... significantly speeds up CLOC/SILC, JAMBU, and POET, with the mostly sequential nonce-misuse resistant design of POET, performing at 2.14 cpb, becoming faster than the well-parallelizable COPA. Finally, this paper provides the first optimized AES-NI implementations for the novel AE modes OTR, CLOC/SILC, COBRA...

  14. Investigation on potential SCC in gas transmission pipeline in China

    Energy Technology Data Exchange (ETDEWEB)

    Jian, S. [Petroleum Univ., Beijing (China); Zupei, Y.; Yunxin, M. [China Petroleum Pipeline Corp., Beijing (China). Science and Technology Center

    2004-07-01

    Stress corrosion cracking (SCC) is a common phenomenon that occurs on the outer surfaces of buried pipelines. This paper investigated aspects of SCC on 3 transmission pipelines on the West-East Gas Pipeline Project in China. The study was comprised of 3 different investigations: (1) an investigation of SCC cases on constructed pipelines; (2) an evaluation of SCC sensitivity of pipeline steels in typical soil environments; and (3) an analysis of soil environments and operation conditions of western pipelines. The study included a review of pipeline corrosion investigations, as well as an examination of pipeline failure cases. Investigative digs were conducted at 21 sites to test soil chemistries. Slow strain rate stress were conducted to evaluate SCC sensitivity of steel pipelines used in China. Potentiodynamic polarization tests were conducted to characterize the electrochemical behaviour of the X70 line pipe steel in different soil environments. Results of the study showed that the environmental conditions in many locations in China contributed to SCC in pipelines. SCC was observed on the surface of X70 steel pipe specimens in both marsh and saline environments. Seasonal temperature changes also contributed additional stress on pipelines. The movement of soil bodies in mountainous areas also contributed to stress and coating damage. It was concluded that proper cathodic protection can alleviate concentrations of local solutions under disbanded coatings. Overprotection of SCC will accelerate the growth of cracks and the degradation of coatings. Samples gathered from the solutions found under the disbanded coatings of pipelines will be used to form part of a reference database for predicting SCC in oil and gas pipelines in the future. 2 refs., 4 tabs., 5 figs.

  15. MAGERI: Computational pipeline for molecular-barcoded targeted resequencing.

    Directory of Open Access Journals (Sweden)

    Mikhail Shugay

    2017-05-01

    Full Text Available Unique molecular identifiers (UMIs show outstanding performance in targeted high-throughput resequencing, being the most promising approach for the accurate identification of rare variants in complex DNA samples. This approach has application in multiple areas, including cancer diagnostics, thus demanding dedicated software and algorithms. Here we introduce MAGERI, a computational pipeline that efficiently handles all caveats of UMI-based analysis to obtain high-fidelity mutation profiles and call ultra-rare variants. Using an extensive set of benchmark datasets including gold-standard biological samples with known variant frequencies, cell-free DNA from tumor patient blood samples and publicly available UMI-encoded datasets we demonstrate that our method is both robust and efficient in calling rare variants. The versatility of our software is supported by accurate results obtained for both tumor DNA and viral RNA samples in datasets prepared using three different UMI-based protocols.

  16. Marine Environmental Protection and Transboundary Pipeline Projects: A Case Study of the Nord Stream Pipeline

    Directory of Open Access Journals (Sweden)

    Alexander Lott

    2011-06-01

    Full Text Available The Nord Stream transboundary submarine pipeline, significant for its impact on the EU energy policy, has been a heav- ily debated issue in the Baltic Sea region during the past decade. This is partly due to the concerns over the effects that the pipeline might have on the Baltic Sea as a particularly sensitive large marine ecosystem.  This manuscript focuses on the issue from the viewpoint of the UNCLOS legal framework and its related treaties. It thus illustrates some of the more polemical topics arising in modern law of the sea and environmental law, eg limitations on the freedom to lay submarine pipelines, the scope and boundaries of marine scientific research, the obligation to consider alter- natives in the course of an EIA. In broader terms, this manuscript presents an explanatory study of matters mostly related to sustainable development, the precautionary principle and the ecosystem approach.

  17. Environmental impact assessment in the pipeline industry. Experiences with the UK north western ethylene pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Ryde, A.

    1997-12-31

    The north western ethylene pipeline is the final link between Shell`s oil and gas fields in the North Sea and its petrochemical complexes in Cheshire. The natural gas from which ethylene is obtained comes from the Brent and central fields in the North Sea. Environmental impacts are discussed in this paper covering topics as follow: Regulatory and legal aspects; environmental assessment during planning and design; environmental control during construction; environmental management during operation; environmental controls at sensitive sites on the north western ethylene pipeline: some examples. 11 refs., 2 figs.

  18. Environmental impact assessment in the pipeline industry. Experiences with the UK north western ethylene pipeline

    International Nuclear Information System (INIS)

    Ryder, A.

    1997-01-01

    The north western ethylene pipeline is the final link between Shell's oil and gas fields in the North Sea and its petrochemical complexes in Cheshire. The natural gas from which ethylene is obtained comes from the Brent and central fields in the North Sea. Environmental impacts are discussed in this paper covering topics as follow: Regulatory and legal aspects; environmental assessment during planning and design; environmental control during construction; environmental management during operation; environmental controls at sensitive sites on the north western ethylene pipeline: some examples. 11 refs., 2 figs

  19. Virtual Pipeline System Testbed to Optimize the U.S. Natural Gas Transmission Pipeline System

    Energy Technology Data Exchange (ETDEWEB)

    Kirby S. Chapman; Prakash Krishniswami; Virg Wallentine; Mohammed Abbaspour; Revathi Ranganathan; Ravi Addanki; Jeet Sengupta; Liubo Chen

    2005-06-01

    The goal of this project is to develop a Virtual Pipeline System Testbed (VPST) for natural gas transmission. This study uses a fully implicit finite difference method to analyze transient, nonisothermal compressible gas flow through a gas pipeline system. The inertia term of the momentum equation is included in the analysis. The testbed simulate compressor stations, the pipe that connects these compressor stations, the supply sources, and the end-user demand markets. The compressor station is described by identifying the make, model, and number of engines, gas turbines, and compressors. System operators and engineers can analyze the impact of system changes on the dynamic deliverability of gas and on the environment.

  20. The Independence Pipeline project : ANR's supply link - Independence Pipeline, Transco's market link

    International Nuclear Information System (INIS)

    Persells, T.

    1998-01-01

    An overview of the Independence Pipeline project was presented. The project offers access from Chicago to the U.S. Midwest market, as well as to Ontario via MichCon, Consumers Power, Great Lakes and Panhandle. The project has three components: ANR's Supply Link, the Independence Pipeline and Transco's MarketLink. The three components are budgeted at $ 1.332 billion dollars and projected for completion between Nov 1999 and Nov 2000. Each component (services, access advantages, market links, rates, storage services, etc ) are described separately. figs

  1. Influence of remanent magnetization on pitting corrosion in pipeline steel

    Energy Technology Data Exchange (ETDEWEB)

    Espina-Hernandez, J. H. [ESIME Zacatenco, SEPI Electronica Instituto Politecnico Nacional Mexico, D. F. (Mexico); Caleyo, F.; Hallen, J. M. [DIM-ESIQIE, Instituto Politecnico Nacional Mexico D. F. (Mexico); Lopez-Montenegro, A.; Perez-Baruch, E. [Pemex Exploracion y Produccion, Region Sur Villahermosa, Tabasco (Mexico)

    2010-07-01

    Statistical studies performed in Mexico indicate that leakage due to external pitting corrosion is the most likely cause of failure of buried pipelines. When pipelines are inspected with the magnetic flux leakage (MFL) technology, which is routinely used, the magnetization level of every part of the pipeline changes as the MFL tool travels through it. Remanent magnetization stays in the pipeline wall after inspection, at levels that may differ from a point to the next. This paper studies the influence of the magnetic field on pitting corrosion. Experiments were carried out on grade 52 steel under a level of remanent magnetization and other laboratory conditions that imitated the conditions of a pipeline after an MLF inspection. Non-magnetized control samples and magnetized samples were subjected to pitting by immersion in a solution containing chlorine and sulfide ions for seven days, and then inspected with optical microscopy. Results show that the magnetic field in the pipeline wall significantly increases pitting corrosion.

  2. Influence of Anchoring on Burial Depth of Submarine Pipelines.

    Science.gov (United States)

    Zhuang, Yuan; Li, Yang; Su, Wei

    2016-01-01

    Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed.

  3. Managing changes of location classes of gas pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Cunha, Sergio B.; Sousa, Antonio Geraldo de [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Most of the gas pipeline design codes utilize a class location system, where the design safety factor and the hydrostatic test factor are determined according to the population density in the vicinities of the pipeline route. Consequently, if an operator is requested or desires to maintain an existing gas pipeline in compliance with its design code, it will reduce the operational pressure or replace pipe sections to increase the wall thickness whenever a change in location class takes place. This article introduces an alternative methodology to deal with changes in location classes of gas pipelines. Initially, selected codes that utilize location class systems are reviewed. Afterwards, a model for the area affected by an ignition following a natural gas pipeline leak is described. Finally, a methodology to determine the MAOP and third part damage mitigation measures for gas transport pipelines that underwent changes in location class is presented. (author)

  4. Leadership Pipeline på rejse i den offentlige sektor

    DEFF Research Database (Denmark)

    Nielsen, Jeppe; Dahl, Kristian Aagaard

    2015-01-01

    udbredelse af Leadership Pipeline modellen. Forskningslitteraturen om Leadership Pipeline er imidlertid beskeden. Med teoretisk ammunition fra ”idé på rejse” perspektivet og et multi-level case studie i den danske offentlige sektor belyser artiklen udbredelse og implementering af Leadership Pipeline. Ved...... at anvende skiftende teoretiske begreber og henholdsvis zoome-ind (organisationsniveau) og zoome-ud (feltniveau) viser artiklen, hvordan en række gensidigt forbundne teoretiserings- og translationsaktiviteter sikrede Leadership Pipeline legitimitet og fremskyndede dens udbredelse samtidig med, at forskellige...... praksisvarianter af Leadership Pipeline udkrystalliserede sig i offentlige organisationer med hver deres kendetegn og problemdefinitioner. Med afsæt i denne empiri argumenterer vi for, at implementering af Leadership Pipeline udspillede sig i overlappende teoretiserings- og translationsaktiviteter, der forstærkede...

  5. Multi-attribute risk assessment for risk ranking of natural gas pipelines

    International Nuclear Information System (INIS)

    Brito, A.J.; Almeida, A.T. de

    2009-01-01

    The paper presents a decision model for risk assessment and for risk ranking of sections of natural gas pipelines based on multi-attribute utility theory. Pipeline hazard scenarios are surveyed and the reasons for a risk assessment model based on a multi-attribute approach are presented. Three dimensions of impact and the need to translate decision-makers' preferences into risk management decisions are highlighted. The model approaches these factors by using a multi-attribute utility function, in order to produce multi-dimensional risk measurements. By using decision analysis concepts, this model quantitatively incorporates the decision-maker's preferences and behavior regarding risk within clear and consistent risk measurements. In order to support the prioritizing of critical sections of pipeline in natural gas companies, this multi-attribute model also allows sections of pipeline to be ranked into a risk hierarchy. A numerical application based on a real case study was undertaken so that the effectiveness of the decision model could be verified

  6. Multi-criteria aid for group decision making on gas pipeline risk analysis; Apoio multicriterio a decisao em grupo na analise de risco em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Yuri G.; Cavalcante, Cristiano A.V.; Brito, Anderson J. de M.; Almeida, Adiel T. de [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil)

    2008-07-01

    Risks are, by nature, subjective, and therefore, complex. They present multidimensional aspects and involve various stakeholders. The pipelines transmission and distribution of natural gas (NG) involve various scenarios of risks, resulting from the distinct environments where the supply chain of NG is inserted. This paper proposes a multi criteria model for group decision support, based on the GDSS PROMETHEE approach, for risk assessment in pipelines sections. The proposed model aims to establish a ranking between the sections of a pipeline network, in order to provide insights to the definition of risk mitigation actions. (author)

  7. MrBUMP: an automated pipeline for molecular replacement

    OpenAIRE

    Keegan, Ronan M.; Winn, Martyn D.

    2007-01-01

    A novel automation pipeline for macromolecular structure solution by molecular replacement is described. There is a special emphasis on the discovery and preparation of a large number of search models, all of which can be passed to the core molecular-replacement programs. For routine molecular-replacement problems, the pipeline automates what a crystallographer might do and its value is simply one of convenience. For more difficult cases, the pipeline aims to discover the particular template ...

  8. Pipeline developments 1998 and beyond : more choices, more difficult decisions

    International Nuclear Information System (INIS)

    VanderSchee, K.

    1998-01-01

    Some of the basic economic principles that drive gas prices and gas flows across North America, and the pressures these have placed on the pipeline sector, are reviewed. Of pressing importance to the natural gas industry in Western Canada is the prospect that in the near future industrial gas users in eastern Canada will have a wider array of pipeline choices available to them than ever before. This will mean that the users will face more offerings from more pipeline providers, forcing pipeline owners to make more difficult decisions regarding new pipeline capacity. Variables such as price, terms and conditions will become increasingly negotiable. Market power concerns also remain an important issue. As a result, there is increasing call for market-based financial regulation of pipelines. 'Market gaming' a condition where a firm manipulates the market to its own market advantage is also receiving considerable attention. The latter is of particular concern in the United States. Against this background, the nature of competition (or the lack of it) in natural gas transport, the influence of short-term service revenues for pipelines, pipeline commitments through subsidiaries, and concerns over short term pipeline valuations skewing investment decisions, are issues that will continue to invite much attention. Regarding market outlook, it was noted that significantly increased export capacity from Alberta could raise the costs of Alberta supplies to eastern Canadian end-users relative to other supply/transport options which may now be viable economic alternatives. figs

  9. Computer models of pipeline systems based on electro hydraulic analogy

    Science.gov (United States)

    Kolesnikov, S. V.; Kudinov, V. A.; Trubitsyn, K. V.; Tkachev, V. K.; Stefanyuk, E. V.

    2017-10-01

    This paper describes the results of the development of mathematical and computer models of complex multi-loop branched pipeline networks for various purposes (water-oil-gas pipelines, heating networks, etc.) based on the electro hydraulic analogy of current spread in conductors and fluids in pipelines described by the same equations. Kirchhoff’s laws used in the calculation of electrical networks are applied in the calculations for pipeline systems. To maximize the approximation of the computer model to the real network concerning its resistance to the process of transferring the medium, the method of automatic identification of the model is applied.

  10. Airbag for the closing of pipelines on explosions and leakages

    DEFF Research Database (Denmark)

    Eisenreich, N.; Neutz, J.; Seiler, F.

    2007-01-01

    This paper is a result of international effort aimed at the construction of a device for quick closing of pipelines in the case of explosion propagation and/or chemical leakage. Such a problem exists in industries where flammable substances are transported by pipelines. The basic solution principle...... was the idea to use airbags similar to those utilized in cars. Two pipeline applications were taken into consideration: a low-pressure module able to suppress explosion propagation and a high-pressure module to stop leakages from, e.g. natural gas pipeline capable to be used for duct diameters up to 0.6 m...

  11. Induced voltages in metallic pipelines near power transmission lines

    International Nuclear Information System (INIS)

    Grcev, Leonid; Jankov, Voislav; Filiposki, Velimir

    2002-01-01

    With the continuous development of the electric power system and the pipeline networks used to convey oil or natural gas, cases of close proximity of high voltage structures and metallic pipelines become more and more frequent. Accordingly there is a growing concern about possible hazards resulting from voltages induced in the metallic pipelines by magnetic coupling with nearby power transmission lines. This paper presents a methodology for computation of the induced voltages in buried isolated metallic pipelines. A practical example of computation is also presented. (Author)

  12. Pipeline leak detection method and control device therefor

    International Nuclear Information System (INIS)

    Bell, D.A.

    1983-01-01

    Leaks may be located in a pipeline by introducing into the pipeline an assembly that includes a pipe-sealing packer unit, a control unit, and a radioactive source shielded from the control unit. The control unit includes a gamma ray detector that controls the sealing and unsealing of the pipe by the packer in response to the detection of radiation exceeding a preset threshold - a detection event. The assembly is pushed through the pipeline by a relatively low fluid pressure behind it. The progress of the assembly through the pipeline may be monitored externally by a gamma ray detector

  13. Quantitative risk analysis in two pipelines operated by TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, Claudio B. [PETROBRAS Transporte S/A (TRANSPETRO), Rio de Janeiro, RJ (Brazil); Pinho, Edson [Universidade Federal Rural do Rio de Janeiro (UFRRJ), Seropedica, RJ (Brazil); Bittencourt, Euclides [Centro Universitario FIB, Salvador , BA (Brazil)

    2009-07-01

    Transportation risk analysis techniques were used to study two pipelines operated by TRANSPETRO. The Pipeline A is for the simultaneous transportation of diesel, gasoline and LPG and comprises three parts, all of them crossing rural areas. The Pipeline B is for oil transportation and one of its ends is located in an area of a high density population. Both pipelines had their risk studied using the PHAST RISK{sup R} software and the individual risk measures, the only considered measures for license purposes for this type of studies, presented level far below the maximum tolerable levels considered. (author)

  14. The pipelined readout for the ZEUS calorimeter

    International Nuclear Information System (INIS)

    Hervas, L.

    1991-01-01

    The electron-proton storage ring complex HERA under construction at DESY in Hamburg is the first machine of a new generation of colliders. Since physics to be studied at HERA (covered in chapter 2) base on the precise measurement of kinematic variables over a very large range of energies, a foremost emphasis is set in calorimetry. After long studies and an ambitious test program, the ZEUS collaboration has built a high resolution depleted uranium-scintillator calorimeter with photomultiplier readout, the state of the art in detectors of this type. In chapter 3 the principles of calorimetry are reviewed and the construction of the ZEUS calorimeter is described. Mainly due to the large dynamic range and the short bunch crossing times a novel concept for the readout in an analog pipelined fashion had to be designed. This concept is explained in chapter 4. The solid state implementation of the pipeline required two integrated circuits which were developed specially for the ZEUS calorimeter in collaboration with an electronics research institute and produced by industry. The design and construction of these devices and the detailed testing which has been performed for properties critical in the readout is covered in chapters 5 and 6. The whole pipelined readout is a complicated setup with many steps and collaborating systems. Its implementation and the information to operate it are covered in chapter 7. Finally the concepts presented and the applications discussed have been installed and tested on a test beam calibration experiment. There, the modules of the calorimeter have been calibrated. Chapter 8 presents results from these measurements which show excellent performance of the electronics as well as optimal properties of the calorimeter modules. (orig./HSI)

  15. Materials Solutions for Hydrogen Delivery in Pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Ningileri, Shridas T.; Boggess, Todd A; Stalheim, Douglas

    2013-01-02

    The main objective of the study is as follows: Identify steel compositions/microstructures suitable for construction of new pipeline infrastructure and evaluate the potential use of the existing steel pipeline infrastructure in high pressure gaseous hydrogen applications. The microstructures of four pipeline steels were characterized and tensile testing was conducted in gaseous hydrogen and helium at pressures of 5.5 MPa (800 psi), 11 MPa (1600 psi) and 20.7 MPa (3000 psi). Based on reduction of area, two of the four steels that performed the best across the pressure range were selected for evaluation of fracture and fatigue performance in gaseous hydrogen at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi). The basic format for this phase of the study is as follows: Microstructural characterization of volume fraction of phases in each alloy; Tensile testing of all four alloys in He and H{sub 2} at 5.5 MPa (800 psi), 11 MPa (1600 psi), and 20.7 MPa (3000 psi). RA performance was used to choose the two best performers for further mechanical property evaluation; Fracture testing (ASTM E1820) of two best tensile test performers in H{sub 2} at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi); Fatigue testing (ASTM E647) of two best tensile test performers in H2 at 5.5 MPa (800 psi) and 20.7 MPa (3000 psi) with frequency =1.0 Hz and R-ratio=0.5 and 0.1.

  16. Pipeline bottoming cycle study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle working fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.

  17. Epoxy Pipelining Composition and Method of Manufacture.

    Science.gov (United States)

    1994-12-14

    decanoic acid (capric acid , 5 CH3(CH 2),CO2H), dodecanoic acid ( lauric acid , CH3(CH 2)10C0 2H), tetradecanoic acid 6 (myristic acid , CH 3(CH 2)12C0 2H...hydrochloric acid , hydrogen sulfide, sulfuric acid , and other corrosive 21 products of bacterial activity. Excessively high flow rates also erode the metal...direct impact test). There is a need for a pipelining network polymer which resists attack 14 from fuels, chemicals, acids , bases, sewage and other

  18. The First Steps into a "Leaky Pipeline"

    DEFF Research Database (Denmark)

    Emerek, Ruth; Larsen, Britt Østergaard

    2011-01-01

    Research shows that the higher the level of academic positions at universities the lower the percentage of women among employees also applies at Danish universities. This may be due to a historical backlog or merely to a 'Leaky pipeline', as earlier studies have revealed that an increasing...... proportion of women among university graduates has not resulted in an increasing proportion of women among university academics. This study based on data from Aalborg University documents by the use of longitudinal analyses that the ‘pipeline’ leaks women at the very first steps of the career ladder....

  19. Leadership Pipeline i den offentlige sektor

    DEFF Research Database (Denmark)

    Molly-Søholm, Thorkil; Dahl, Kristian Aagaard

    2013-01-01

    Teorien Leadership Pipeline er de seneste ca. ti år vundet kraftigt frem som en deskriptiv ramme for ledelse og som et styrende paradigme for store internationale koncerners ledelsesinfrastruktur (Kaiser, 2011). Teorien beskriver bl.a. hvilke færdigheder, prioriteter og arbejdsværdier, der skal til...... Leadership pipelineteoriens Gennem en række kvalitative fokusgruppeinterviews med 100 ledere fra forskellige lederniveauer blev der arbejdet med disse spørgsmål. Analysen af dataene indikerer, at teorien skal suppleres af otte kompetencefelter. Afslutningsvist diskuteres begrænsninger i forskningsdesignet...

  20. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Science.gov (United States)

    2013-07-12

    ... underwater pipe should include the use of visual inspection by divers or instrumented detection. Information... owners and operators of gas and hazardous liquid pipelines to communicate the potential for damage to... class location, failures, leakage history, corrosion, substantial changes in cathodic protection...

  1. 77 FR 45417 - Pipeline Safety: Inspection and Protection of Pipeline Facilities After Railway Accidents

    Science.gov (United States)

    2012-07-31

    ... flammable liquid. Thirteen of the derailed tank cars were breached or lost product and caught fire. At the... severely dented the pipeline. The impact caused a severe flattening of the pipe casing with sharp angular... to the 16-inch casing pipe likely caused similar damage to the 12-inch carrier pipe. The NTSB...

  2. 75 FR 72778 - Pipeline Safety: Technical Pipeline Safety Advisory Committee Meeting

    Science.gov (United States)

    2010-11-26

    ... pipeline safety regulations to the remaining unregulated rural onshore hazardous liquid low-stress... comment, if submitted on behalf of an association, business, labor union, etc.). Therefore, you may want..., business, labor union, etc.). DOT's complete Privacy Act Statement was published in the Federal Register on...

  3. A graph-based approach for designing extensible pipelines.

    Science.gov (United States)

    Rodrigues, Maíra R; Magalhães, Wagner C S; Machado, Moara; Tarazona-Santos, Eduardo

    2012-07-12

    In bioinformatics, it is important to build extensible and low-maintenance systems that are able to deal with the new tools and data formats that are constantly being developed. The traditional and simplest implementation of pipelines involves hardcoding the execution steps into programs or scripts. This approach can lead to problems when a pipeline is expanding because the incorporation of new tools is often error prone and time consuming. Current approaches to pipeline development such as workflow management systems focus on analysis tasks that are systematically repeated without significant changes in their course of execution, such as genome annotation. However, more dynamism on the pipeline composition is necessary when each execution requires a different combination of steps. We propose a graph-based approach to implement extensible and low-maintenance pipelines that is suitable for pipeline applications with multiple functionalities that require different combinations of steps in each execution. Here pipelines are composed automatically by compiling a specialised set of tools on demand, depending on the functionality required, instead of specifying every sequence of tools in advance. We represent the connectivity of pipeline components with a directed graph in which components are the graph edges, their inputs and outputs are the graph nodes, and the paths through the graph are pipelines. To that end, we developed special data structures and a pipeline system algorithm. We demonstrate the applicability of our approach by implementing a format conversion pipeline for the fields of population genetics and genetic epidemiology, but our approach is also helpful in other fields where the use of multiple software is necessary to perform comprehensive analyses, such as gene expression and proteomics analyses. The project code, documentation and the Java executables are available under an open source license at http://code.google.com/p/dynamic-pipeline. The system

  4. A graph-based approach for designing extensible pipelines

    Directory of Open Access Journals (Sweden)

    Rodrigues Maíra R

    2012-07-01

    Full Text Available Abstract Background In bioinformatics, it is important to build extensible and low-maintenance systems that are able to deal with the new tools and data formats that are constantly being developed. The traditional and simplest implementation of pipelines involves hardcoding the execution steps into programs or scripts. This approach can lead to problems when a pipeline is expanding because the incorporation of new tools is often error prone and time consuming. Current approaches to pipeline development such as workflow management systems focus on analysis tasks that are systematically repeated without significant changes in their course of execution, such as genome annotation. However, more dynamism on the pipeline composition is necessary when each execution requires a different combination of steps. Results We propose a graph-based approach to implement extensible and low-maintenance pipelines that is suitable for pipeline applications with multiple functionalities that require different combinations of steps in each execution. Here pipelines are composed automatically by compiling a specialised set of tools on demand, depending on the functionality required, instead of specifying every sequence of tools in advance. We represent the connectivity of pipeline components with a directed graph in which components are the graph edges, their inputs and outputs are the graph nodes, and the paths through the graph are pipelines. To that end, we developed special data structures and a pipeline system algorithm. We demonstrate the applicability of our approach by implementing a format conversion pipeline for the fields of population genetics and genetic epidemiology, but our approach is also helpful in other fields where the use of multiple software is necessary to perform comprehensive analyses, such as gene expression and proteomics analyses. The project code, documentation and the Java executables are available under an open source license at http://code.google.com/p/dynamic-pipeline

  5. Energy geopolitics and Iran-Pakistan-India gas pipeline

    International Nuclear Information System (INIS)

    Verma, Shiv Kumar

    2007-01-01

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this pipeline for India

  6. The pipeline service obligation under changing LDC purchasing practices

    International Nuclear Information System (INIS)

    Neff, S.J.

    1990-01-01

    Historically, interstate natural gas pipelines served as aggregators and transporters of gas supplies from the producing fields to the city-gate. In turn, local distribution companies (LDCs) bought gas from pipelines at the city-gate under long-term sales contracts and resold the gas to retail customers. Once a pipeline/LDC sales relationship was established through a regulated certificate process, the LDC was assured of gas supply up to the level of its contract demand (CD) at just and reasonable rates until abandonment of the pipeline's sales service obligation was granted by the Federal Energy Regulatory Commission (FERC). During the years of regulated wellhead pricing and limited gas deliverability, pipelines signed long-term take-or-pay contracts with producers to induce them to develop and commit new gas supplies. Those supply cost obligations were reflected in tariff minimum bill provisions. For years, this pipeline/LDC arrangement was mutually beneficial and provided assured firm service. With the load diversity on large interstate pipeline systems and the make-up provisions under take-or-pay clauses, these gas purchase contracts provided supply reliability without negative economic consequence to the pipelines. Then, with the issuance of FERC Order Nos. 380, 436, and 500, LDCs' obligations to purchase gas from pipeline suppliers according to the terms of those long term sales agreements were irrevocably altered. The impacts of those long term sales agreements were irrevocably altered. The impacts of those orders the elimination of minimum bills and the advent of open access transportation caused a serious erosion of the mutual obligations between pipelines and their LDC customers. The result has been a significant loss of pipeline sales markets as LDC customers have chosen alternative supplied, often at the urging of state public utility commissions (PUCs) to lower short-term costs

  7. The gas century: worldwide LNG developments may deal death blow to Alaskan pipeline dream

    International Nuclear Information System (INIS)

    Lorenz, A.

    2004-01-01

    The growing interest in liquefied natural gas (LNG), which casts doubt on the viability of the Alaska gas pipeline, and the potential impacts on Canadian gas exports to the United States are discussed. There is currently a proposal before Congress for an Alaskan LNG project, and consensus appears to be building among American energy experts and law-makers that building a multitude of LNG facilities would be more flexible and cheaper than building the proposed Alaska pipeline. As further proof of the growing popularity of LNG, U.S. industry lobbyists are said to be rapidly gaining congressional support for the idea of building eight to ten billion cubic feet per day of LNG capacity along the U. S. coast. Either development, -- LNG facilities or the Alaska pipeline -- have the potential to seriously impact Canadian natural gas exports. If the Alaska pipeline is built, the addition of five billion cubic feet per day of new gas on the market would cause gas prices to fall; if the U.S. decides to subsidize its gas industry, Canadian gas would be put at a serious disadvantage. Conversely, if the Alaskan LNG proposal were to succeed, the potential demise of the Alaska pipeline would mean the loss of about 12,000 jobs that would be created during the Canadian construction phase of the pipeline, as well as the loss of tariffs. Industry experts predict that by 2005 LNG terminals will dot the periphery of the U. S. coast line; to prepare for these eventualities, Canadian companies, such as Irving Oil, TransCanada Pipelines and EnCana are taking note, and are scrambling not to be left out of the game. As proof of the seriousness of their concern, Irving Oil is adding a Can$500 million LNG facility to its Canaport terminal on the Scotian shelf; TCPL is working to supply an LNG terminal offshore Massachusetts, and EnCana is refurbishing a Louisiana salt cavern to prepare for storage of gas delivered to the Gulf Coast

  8. Pipeline FFT Architectures Optimized for FPGAs

    Directory of Open Access Journals (Sweden)

    Bin Zhou

    2009-01-01

    Full Text Available This paper presents optimized implementations of two different pipeline FFT processors on Xilinx Spartan-3 and Virtex-4 FPGAs. Different optimization techniques and rounding schemes were explored. The implementation results achieved better performance with lower resource usage than prior art. The 16-bit 1024-point FFT with the R22SDF architecture had a maximum clock frequency of 95.2 MHz and used 2802 slices on the Spartan-3, a throughput per area ratio of 0.034 Msamples/s/slice. The R4SDC architecture ran at 123.8 MHz and used 4409 slices on the Spartan-3, a throughput per area ratio of 0.028 Msamples/s/slice. On Virtex-4, the 16-bit 1024-point R22SDF architecture ran at 235.6 MHz and used 2256 slice, giving a 0.104 Msamples/s/slice ratio; the 16-bit 1024-point R4SDC architecture ran at 219.2 MHz and used 3064 slices, giving a 0.072 Msamples/s/slice ratio. The R22SDF was more efficient than the R4SDC in terms of throughput per area due to a simpler controller and an easier balanced rounding scheme. This paper also shows that balanced stage rounding is an appropriate rounding scheme for pipeline FFT processors.

  9. Economic model of pipeline transportation systems

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.

    1977-07-29

    The objective of the work reported here was to develop a model which could be used to assess the economic effects of energy-conservative technological innovations upon the pipeline industry. The model is a dynamic simulator which accepts inputs of two classes: the physical description (design parameters, fluid properties, and financial structures) of the system to be studied, and the postulated market (throughput and price) projection. The model consists of time-independent submodels: the fluidics model which simulates the physical behavior of the system, and the financial model which operates upon the output of the fluidics model to calculate the economics outputs. Any of a number of existing fluidics models can be used in addition to that developed as a part of this study. The financial model, known as the Systems, Science and Software (S/sup 3/) Financial Projection Model, contains user options whereby pipeline-peculiar characteristics can be removed and/or modified, so that the model can be applied to virtually any kind of business enterprise. The several dozen outputs are of two classes: the energetics and the economics. The energetics outputs of primary interest are the energy intensity, also called unit energy consumption, and the total energy consumed. The primary economics outputs are the long-run average cost, profit, cash flow, and return on investment.

  10. Pipelining Architecture of Indexing Using Agglomerative Clustering

    Science.gov (United States)

    Goyal, Deepika; Goyal, Deepti; Gupta, Parul

    2010-11-01

    The World Wide Web is an interlinked collection of billions of documents. Ironically the huge size of this collection has become an obstacle for information retrieval. To access the information from Internet, search engine is used. Search engine retrieve the pages from indexer. This paper introduce a novel pipelining technique for structuring the core index-building system that substantially reduces the index construction time and also clustering algorithm that aims at partitioning the set of documents into ordered clusters so that the documents within the same cluster are similar and are being assigned the closer document identifiers. After assigning to the clusters it creates the hierarchy of index so that searching is efficient. It will make the super cluster then mega cluster by itself. The pipeline architecture will create the index in such a way that it will be efficient in space and time saving manner. It will direct the search from higher level to lower level of index or higher level of clusters to lower level of cluster so that the user gets the possible match result in time saving manner. As one cluster is making by taking only two clusters so it search is limited to two clusters for lower level of index and so on. So it is efficient in time saving manner.

  11. Archaeological Excavations on the BTC Pipeline, Azerbaijan

    Directory of Open Access Journals (Sweden)

    Paul Michael Taylor

    2011-06-01

    Full Text Available The archaeology and history of the Republic of Azerbaijan is not widely known in comparison with that of its neighbours. A recent summary of work in the Caucasus (Smith and Rubinson 2003 contained no specific references to results from Azerbaijan, although the studies were directly comparable and overlapped in period and geography. The reasons for this are many, perhaps the most influential is the presentation of material from Azerbaijan being confused with southern Azerbaijan in Iran in the wider academic audience and the use of the Cyrillic alphabet for reports written in the Azeri language over the past century. The Baku-Tbilisi-Ceyhan (BTC and South Caucasus Pipelines (SCP were constructed through Azerbaijan, Georgia and Turkey during the period 2003-5. BTC was built first from the Caspian Coast to the Georgian border during 2003 and 2004, while the SCP pipeline was built from the Georgian border towards the Caspian and parallel to the BTC in 2005. To investigate and mitigate the effects of this construction, a four year archaeological fieldwork programme (2001-2005 was carried out, followed by a further six-year post-excavation programme that ended in early 2011. This article draws on this extensive archaeological project that combines both the broad corpus of material known in Azerbaijan and new techniques introduced in the Republic for the first time and used on a range of sites that are of both national and international significance.

  12. 75 FR 5536 - Pipeline Safety: Control Room Management/Human Factors, Correction

    Science.gov (United States)

    2010-02-03

    ...: Control Room Management/Human Factors, Correction AGENCY: Pipeline and Hazardous Materials Safety... 63310) entitled ``Pipeline Safety: Control Room Management/Human Factors.'' This final rule contained... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...

  13. 76 FR 22944 - Pipeline Safety: Notice of Public Webinars on Implementation of Distribution Integrity Management...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2011-0084] Pipeline Safety: Notice of Public Webinars on Implementation of Distribution Integrity Management Programs AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION...

  14. Analysis of soil fungal communities by amplicon pyrosequencing: current approaches to data analysis and the introduction of the pipeline SEED

    Czech Academy of Sciences Publication Activity Database

    Větrovský, Tomáš; Baldrian, Petr

    2013-01-01

    Roč. 49, č. 8 (2013), s. 1027-1037 ISSN 0178-2762 R&D Projects: GA MŠk LD12050; GA MŠk LD12048; GA ČR GAP504/12/0709 Institutional support: RVO:61388971 Keywords : Fungal community * Internal transcribed spacer * Pyrosequencing pipeline Subject RIV: EE - Microbiology, Virology Impact factor: 3.396, year: 2013

  15. Pipeline river crossing studies; Estudos de travessias de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Leal, Marcos de Castro; Stasiak, Luciano; Silva, Alessandra de Barros e [ESTEIO Engenharia e Aerolevantamentos S.A., Curitiba, PR (Brazil)

    2005-07-01

    This work has for objective to guide the execution of study of pipelines crossings under courses of water, channels, flooded areas and reservoirs. The study seeks the minimal risks to the pipelines, be them anthropics, geotechnics, hydraulics or environmental, as in the implantation phase as of operation. It also seeks to determine which is the best constructive method for the crossing in question. (author)

  16. Examination of faults active motion on buried pipelines | Parish ...

    African Journals Online (AJOL)

    During an earthquake, a buried pipeline may experience a severe loading as the result of the ground relatively large displacement along the pipe. Large ground movements may occur by faulting, liquefaction, lateral spreading, landslides and slope failures. Since the pipelines are widely spread, and in some areas ...

  17. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... the Federal pipeline safety laws, PHMSA is publishing this notice of special permit request we have... seeking relief from compliance with certain plastic pipe design requirements in the Federal pipeline...

  18. 78 FR 23972 - Pipeline Safety: Information Collection Activities

    Science.gov (United States)

    2013-04-23

    ... on an information collection under Office of Management and Budget (OMB) Control No. 2137-0047...: 1-202-493-2251. Mail: Docket Management Facility; U.S. Department of Transportation (DOT), 1200 New... API 1130 ``Computational Pipeline Monitoring for Liquid Pipelines'' (API 1130). API 1130 section 4.2...

  19. 78 FR 26357 - Cranberry Pipeline Corporation; Notice of Filing

    Science.gov (United States)

    2013-05-06

    ...] Cranberry Pipeline Corporation; Notice of Filing Take notice that on April 25, 2013, Cranberry Pipeline Corporation (Cranberry) submitted tariff records to reflect revisions to its transportation and storage rates, as well as fuel and lost-and- unaccounted-for percentages that Cranberry proposed in its Petition for...

  20. 76 FR 34974 - Cranberry Pipeline Corporation; Notice of Filing

    Science.gov (United States)

    2011-06-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11-113-000] Cranberry Pipeline Corporation; Notice of Filing Take notice that on June 6, 2011, Cranberry Pipeline Corporation (Cranberry) filed to request a case-specific waiver of section 284.126(b)(1)(iv) of the Commission's...

  1. QUANTITATIVE RISK MAPPING OF URBAN GAS PIPELINE NETWORKS USING GIS

    Directory of Open Access Journals (Sweden)

    P. Azari

    2017-09-01

    Full Text Available Natural gas is considered an important source of energy in the world. By increasing growth of urbanization, urban gas pipelines which transmit natural gas from transmission pipelines to consumers, will become a dense network. The increase in the density of urban pipelines will influence probability of occurring bad accidents in urban areas. These accidents have a catastrophic effect on people and their property. Within the next few years, risk mapping will become an important component in urban planning and management of large cities in order to decrease the probability of accident and to control them. Therefore, it is important to assess risk values and determine their location on urban map using an appropriate method. In the history of risk analysis of urban natural gas pipeline networks, the pipelines has always been considered one by one and their density in urban area has not been considered. The aim of this study is to determine the effect of several pipelines on the risk value of a specific grid point. This paper outlines a quantitative risk assessment method for analysing the risk of urban natural gas pipeline networks. It consists of two main parts: failure rate calculation where the EGIG historical data are used and fatal length calculation that involves calculation of gas release and fatality rate of consequences. We consider jet fire, fireball and explosion for investigating the consequences of gas pipeline failure. The outcome of this method is an individual risk and is shown as a risk map.

  2. legal and institutional framework for promoting oil pipeline security

    African Journals Online (AJOL)

    RAYAN_

    ABSTRACT. Oil pipelines are no ordinary assets, and their security is of utmost importance especially in a country like Nigeria where oil pipelines are the major means of transporting crude oil. Nigeria relies on this means of transportation, which has been the victim of various physical attacks over the years by vandals.

  3. The "Learning Disabilities to Juvenile Detention" Pipeline: A Case Study

    Science.gov (United States)

    Mallett, Christopher A.

    2014-01-01

    Adolescents becoming formally involved with a juvenile court because of school-related behavior and discipline problems is a phenomenon known as the school-to-prison pipeline. Adolescents with learning disabilities are disproportionately represented within this pipeline. A study was conducted to review the outcomes for a population of youthful…

  4. 18 CFR 284.13 - Reporting requirements for interstate pipelines.

    Science.gov (United States)

    2010-04-01

    .... (5) The requirements for the electronic index can be obtained from the Federal Energy Regulatory... with the pipeline. (c) Index of customers. (1) On the first business day of each calendar quarter, an interstate pipeline must file with the Commission an index of all its firm transportation and storage...

  5. 76 FR 4103 - ETC Tiger Pipeline, LLC; Notice of Filing

    Science.gov (United States)

    2011-01-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AC11-25-000] ETC Tiger Pipeline, LLC; Notice of Filing January 13, 2011. Take notice that on December 30, 2010, ETC Tiger Pipeline, LLC submitted a request for a waiver of the reporting requirement to file the FERC Form 2 for 2010...

  6. 75 FR 38799 - ETC Tiger Pipeline, LLC; Notice of Application

    Science.gov (United States)

    2010-07-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-459-000] ETC Tiger Pipeline, LLC; Notice of Application June 25, 2010. Take notice that on June 15, 2010, ETC Tiger Pipeline, LLC (ETC Tiger), 711 Louisiana Street, Suite 900, Houston, Texas 77002, filed an application in Docket...

  7. 77 FR 34457 - Pipeline Safety: Mechanical Fitting Failure Reports

    Science.gov (United States)

    2012-06-11

    ... failures in the body of the mechanical fitting, failures in the joints between the fitting and the pipe... from the use of a fitting and may include failures in the body of mechanical fitting, failures in the.... PHMSA-2012-0079] Pipeline Safety: Mechanical Fitting Failure Reports AGENCY: Pipeline and Hazardous...

  8. Quantitative Risk Mapping of Urban Gas Pipeline Networks Using GIS

    Science.gov (United States)

    Azari, P.; Karimi, M.

    2017-09-01

    Natural gas is considered an important source of energy in the world. By increasing growth of urbanization, urban gas pipelines which transmit natural gas from transmission pipelines to consumers, will become a dense network. The increase in the density of urban pipelines will influence probability of occurring bad accidents in urban areas. These accidents have a catastrophic effect on people and their property. Within the next few years, risk mapping will become an important component in urban planning and management of large cities in order to decrease the probability of accident and to control them. Therefore, it is important to assess risk values and determine their location on urban map using an appropriate method. In the history of risk analysis of urban natural gas pipeline networks, the pipelines has always been considered one by one and their density in urban area has not been considered. The aim of this study is to determine the effect of several pipelines on the risk value of a specific grid point. This paper outlines a quantitative risk assessment method for analysing the risk of urban natural gas pipeline networks. It consists of two main parts: failure rate calculation where the EGIG historical data are used and fatal length calculation that involves calculation of gas release and fatality rate of consequences. We consider jet fire, fireball and explosion for investigating the consequences of gas pipeline failure. The outcome of this method is an individual risk and is shown as a risk map.

  9. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Science.gov (United States)

    2013-08-01

    ..., include a self-addressed stamped postcard. Internet users may submit comments at http://www.regulations... early method of differentiating risk along gas pipelines. The class location concept pre-dates Federal... prevalent along the pipeline (Class 4). Design factors, which are used in the formula to determine the...

  10. 76 FR 51017 - ANR Pipeline Company; Notice of Application

    Science.gov (United States)

    2011-08-17

    ... service through approximately 7.5 miles of 20-inch pipeline from the producer platform located in High... Commission and open to public inspection. The filing may also be viewed on the Web at http://www.ferc.gov... directed to Rene Staeb, Manager, Project Determinations & Regulatory Administration, ANR Pipeline Company...

  11. 76 FR 34971 - ANR Pipeline Company; Notice of Application

    Science.gov (United States)

    2011-06-15

    ... pipeline from South Pelto Block 13 to a manifold platform in Ship Shoal Block 70, and appurtenances... Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov... directed to Rene Staeb, Manager, Project Determinations & Regulatory Administration, ANR Pipeline Company...

  12. Gender Equality in the Academy: The Pipeline Problem

    Science.gov (United States)

    Monroe, Kristen Renwick; Chiu, William F.

    2010-01-01

    As part of the ongoing work by the Committee on the Status of Women in the Profession (CSWP), we offer an empirical analysis of the pipeline problem in academia. The image of a pipeline is a commonly advanced explanation for persistent discrimination that suggests that gender inequality will decline once there are sufficient numbers of qualified…

  13. Surface wave propagation effects on buried segmented pipelines

    Directory of Open Access Journals (Sweden)

    Peixin Shi

    2015-08-01

    Full Text Available This paper deals with surface wave propagation (WP effects on buried segmented pipelines. Both simplified analytical model and finite element (FE model are developed for estimating the axial joint pullout movement of jointed concrete cylinder pipelines (JCCPs of which the joints have a brittle tensile failure mode under the surface WP effects. The models account for the effects of peak ground velocity (PGV, WP velocity, predominant period of seismic excitation, shear transfer between soil and pipelines, axial stiffness of pipelines, joint characteristics, and cracking strain of concrete mortar. FE simulation of the JCCP interaction with surface waves recorded during the 1985 Michoacan earthquake results in joint pullout movement, which is consistent with the field observations. The models are expanded to estimate the joint axial pullout movement of cast iron (CI pipelines of which the joints have a ductile tensile failure mode. Simplified analytical equation and FE model are developed for estimating the joint pullout movement of CI pipelines. The joint pullout movement of the CI pipelines is mainly affected by the variability of the joint tensile capacity and accumulates at local weak joints in the pipeline.

  14. Evaluating the movement of active faults on buried pipelines | Parish ...

    African Journals Online (AJOL)

    During the earthquake, a buried pipeline may be experienced extreme loading that is the result of the relatively large displacement of the Earth along the pipe. Large movements of ground could occur by faulting, liquefaction, lateral spreading, landslides, and slope failures. Since the pipelines are widely spread, and in ...

  15. 76 FR 46786 - Millennium Pipeline Company, LLC; Notice of Application

    Science.gov (United States)

    2011-08-03

    ... Energy Regulatory Commission Millennium Pipeline Company, LLC; Notice of Application Take notice that on July 14, 2011, Millennium Pipeline Company, LLC (Millennium), One Blue Hill Plaza, Seventh Floor, P.O.... These facilities will enable Millennium to increase firm deliveries to its interconnection with...

  16. Application of pre-stressed technology in the crossing construction of the China–Myanmar Gas Pipeline

    Directory of Open Access Journals (Sweden)

    Xuejun Wang

    2015-01-01

    Full Text Available Concrete structure is commonly used in the anchorages of a large cable-suspended pipeline crossing construction. With the increase of span and load, the stress on the concrete anchorages may rise rapidly. In case of traditional anchoring structure fixed by anchor rods, concrete cracking will occur, thereby reducing the anchorage life. To solve this problem, the pre-stressed structure was designed to effectively improve the efficiency of anchoring and reduce engineering cost. In the crossing construction of China–Myanmar Gas Pipeline, the pre-stressed technology was used to establish an effective pre-stressed anchoring system, which integrates the pre-stressed structures (e.g. tunnel anchorages in the anchors and the optimization measures (e.g. positioning mode, anchorage structure, concrete placement, pre-stressed, and medium injection, in line with the crossing structure and load features of this project. The system can delay the occurrence of concrete cracking and enhance the stress durability of the structure and anchoring efficiency. This technology has been successfully applied in the crossing construction of China–Myanmar Gas Pipeline, with good economic and social benefits, indicating that this technology is a new effective solution to the optimization of suspended pipeline anchorage structures, providing technical support for the development of pipeline crossing structure.

  17. Leak detection in pipelines through spectral analysis of pressure signals

    Directory of Open Access Journals (Sweden)

    Souza A.L.

    2000-01-01

    Full Text Available The development and test of a technique for leak detection in pipelines is presented. The technique is based on the spectral analysis of pressure signals measured in pipeline sections where the formation of stationary waves is favoured, allowing leakage detection during the start/stop of pumps. Experimental tests were performed in a 1250 m long pipeline for various operational conditions of the pipeline (liquid flow rate and leakage configuration. Pressure transients were obtained by four transducers connected to a PC computer. The obtained results show that the spectral analysis of pressure transients, together with the knowledge of reflection points provide a simple and efficient way of identifying leaks during the start/stop of pumps in pipelines.

  18. The leak detection and location system design of petroleum pipeline

    International Nuclear Information System (INIS)

    Liu Lixia

    2011-01-01

    In order to improve the sensibility and location precision of petroleum pipeline leak with traditional negative pressure wave detection, a multi-point distributed detection and location monitoring system composed of detection nodes along pipeline, monitoring sub-stations and pressure monitoring center was designed using C/S structure. The detection node gets the pressure signal in pipeline, and sends it to monitoring center through CPRS network that achieves online monitoring for the whole pipeline in real time. The received data was analyzed and processed with multi-point distributed negative pressure wave detection and correlation analysis method. The system can rapidly detect the leak point in pipeline timely and locate accurately to avoid enormous economic loss and environment pollutions accidents. (author)

  19. A study on an autonomous pipeline maintenance robot, 8

    International Nuclear Information System (INIS)

    Fukuda, Toshio; Hosokai, Hidemi; Niitsu, Shunichi; Kaneshige, Masanori; Iwasaki, Shinnosuke.

    1990-01-01

    This paper deals with the path planning and sensing planning expert system with learning functions for the pipeline inspection and maintenance robot, Mark IV. The robot can carry out inspection tasks to autonomously detect malfunctions in a plant pipeline system. Furthermore, the robot becomes more intelligent by adding the following functions: (1) the robot, Mark IV, is capable of inspecting surfaces of storage tanks as well as pipeline outer surfaces; (2) in path planning, the robot has a learning function using information generated in the past such as a moving path, task level and control commands of the robot; (3) in inspecting a pipeline system with plant equipment such as valves, franges, T- and L-joints, the robot is capable of inspecting continuous surfaces in pipeline. Thus, together with the improved path planning expert system (PPES) and the sensing planning expert system (SPES), the Mark IV robot becomes intelligent enough to automatically carry out given inspection tasks. (author)

  20. Efficiency improvements in pipeline transportation systems. Technical report, Task 3

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.; Horton, J. H.

    1977-01-01

    This report identifies those potential energy-conservative pipeline innovations that are most energy- and cost-effective, and formulates recommendations for the R, D, and D programs needed to exploit those opportunities. From a candidate field of over twenty classes of efficiency improvements, eight systems are recommended for pursuit. Most of these possess two highly important attributes: large potential energy savings and broad applicability outside the pipeline industry. The R, D, and D program for each improvement and the recommended immediate next step are described. The eight programs recommended for pursuit are: gas-fired combined-cycle compressor station; internally cooled internal combustion engine; methanol-coal slurry pipeline; methanol-coal slurry-fired and coal-fired engines; indirect-fired coal-burning combined-cycle pump station; fuel-cycle pump station; internal coatings in pipelines; and drag-reducing additives in liquid pipelines.

  1. A risk assessment model for pipelines exposed to geohazards

    Energy Technology Data Exchange (ETDEWEB)

    Esford, F; Porter, M.; Savigny, K.W. [BGC Engineering Inc., Vancouver, BC (Canada); Muhlbauer, W.K. [WKM Consultancy, Swindon (United Kingdom); Dunlop, C. [Transredes (Bolivia)

    2004-07-01

    The challenges facing Trans porte de Hidrocarburos Sociedad Anonima (Transredes) in maintaining and protecting its aging pipeline infrastructure were discussed. Transredes currently operates 2,744 km of liquids pipelines and 2,920 km of gas pipelines in Bolivia, across terrain that is subject to earthquakes, floods and landslides. The 4 to 36 inch inch diameter pipelines are 40 to 50 years old. A quantitative risk assessment procedure was developed to rank the threats to the pipelines and identify locations facing the highest level of risk. The purpose was to prioritize capital and maintenance activities based on risk management principles. The pilot study customized the risk assessment procedures to address the OSSA-1 pipeline's elevated exposure to geohazards. It was shown that the probability of geohazard-related pipeline failure is very site specific and can vary over several orders of magnitude. Twelve sites received high annual probability of failure estimates due to geohazards. These were among the highest ratings along the pipeline due to any hazard type. Although other hazard types also showed high probability of failure scores, many were related to information gaps or uncertainties in the condition of the pipeline. The following 3 initiatives have been identified for the initial OSSA-1 risk mitigation plan: geohazard mitigation; pipe strength uncertainty resolution; and, general uncertainty reduction. Transredes is using the information from this risk assessment to set capital and maintenance budgets and to develop programs to improve the operational safety of the OSSA-1 pipeline. 14 refs., 1 tab., 7 figs.

  2. 76 FR 54531 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes

    Science.gov (United States)

    2011-09-01

    ... Hurricanes AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice... the passage of Hurricanes. ADDRESSES: This document can be viewed on the Office of Pipeline Safety... can result from the passage of hurricanes. That includes the potential for damage to offshore...

  3. 78 FR 42889 - Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems

    Science.gov (United States)

    2013-07-18

    ... Requirements for Utility LP-Gas and LPG Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety... Bulletin to remind owners and operators of liquefied petroleum gas (LPG) and utility liquefied petroleum... natural gas distribution system must meet the requirements of Part 192 and ANSI/NFPA 58 and 59 (2004) (192...

  4. Vegetation assessment in a pipeline influence area: the case study of PETROBRAS ammonia pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Basbaum, Marcos A.; Porciano, Patricia P.; Bonafini, Fabio L. [SEEBLA - Servicos de Engenharia Emilio Baumgart Ltda., Rio de Janeiro, RJ (Brazil)], e-mail: mbasbaum.seebla@petrobras.com.br, e-mail: patriciapp.seebla@petrobras.com.br, e-mail: bonafini.seebla@petrobras.com.br; Guimaraes, Ricardo Z.P.; Torggler, Bianca F.; Fernandes, Renato; Vieira, Elisa D.R. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)], e-mail: rzaluar@petrobras.com.br, e-mail: torggler@petrobras.com.br, e-mail: renatofer@petrobras.com.br, e-mail: elisav@petrobras.com.br

    2009-12-19

    This ammonia pipeline is about 30 km long and links the Fertilizer Plant (FAFEN-BA) to the Urea Marine Terminal (TMU) at the Port of Aratu in Candeias (Bahia State, Brazil). In this study, we characterize the remnants of vegetation and quantify the Permanent Preservation Areas. Furthermore, we propose areas and techniques for their recovery and / or management. The methodology was based on the Rapid Ecological Assessment, which combines selection of areas through remote sensing image analysis, with rapid field campaigns in the selected points. This methodology, successfully applied in PETROBRAS refineries, is first applied in a pipeline influence area. During these campaigns, the main aspects of vegetation, such as phyto physiognomy and ecological succession stages, were registered in field data sheets prepared for this purpose. The most representative remnants of vegetation that could be quantified were Atlantic Forest fragments, as well as those in the Permanent Preservation Areas. (author)

  5. Risk assessment for pipelines with active defects based on artificial intelligence methods

    International Nuclear Information System (INIS)

    Anghel, Calin I.

    2009-01-01

    The paper provides another insight into the pipeline risk assessment for in-service pressure piping containing defects. Beside of the traditional analytical approximation methods or sampling-based methods safety index and failure probability of pressure piping containing defects will be obtained based on a novel type of support vector machine developed in a minimax manner. The safety index or failure probability is carried out based on a binary classification approach. The procedure named classification reliability procedure, involving a link between artificial intelligence and reliability methods was developed as a user-friendly computer program in MATLAB language. To reveal the capacity of the proposed procedure two comparative numerical examples replicating a previous related work and predicting the failure probabilities of pressured pipeline with defects were presented.

  6. Risk assessment for pipelines with active defects based on artificial intelligence methods

    Energy Technology Data Exchange (ETDEWEB)

    Anghel, Calin I. [Department of Chemical Engineering, Faculty of Chemistry and Chemical Engineering, University ' Babes-Bolyai' , Cluj-Napoca (Romania)], E-mail: canghel@chem.ubbcluj.ro

    2009-07-15

    The paper provides another insight into the pipeline risk assessment for in-service pressure piping containing defects. Beside of the traditional analytical approximation methods or sampling-based methods safety index and failure probability of pressure piping containing defects will be obtained based on a novel type of support vector machine developed in a minimax manner. The safety index or failure probability is carried out based on a binary classification approach. The procedure named classification reliability procedure, involving a link between artificial intelligence and reliability methods was developed as a user-friendly computer program in MATLAB language. To reveal the capacity of the proposed procedure two comparative numerical examples replicating a previous related work and predicting the failure probabilities of pressured pipeline with defects were presented.

  7. esATAC: An Easy-to-use Systematic pipeline for ATAC-seq data analysis.

    Science.gov (United States)

    Wei, Zheng; Zhang, Wei; Fang, Huan; Li, Yanda; Wang, Xiaowo

    2018-03-07

    ATAC-seq is rapidly emerging as one of the major experimental approaches to probe chromatin accessibility genome-wide. Here, we present "esATAC", a highly integrated easy-to-use R/Bioconductor package, for systematic ATAC-seq data analysis. It covers essential steps for full analyzing procedure, including raw data processing, quality control and downstream statistical analysis such as peak calling, enrichment analysis and transcription factor footprinting. esATAC supports one command line execution for preset pipelines, and provides flexible interfaces for building customized pipelines. esATAC package is open source under the GPL-3.0 license. It is implemented in R and C ++. Source code and binaries for Linux, MAC OS X and Windows are available through Bioconductor https://www.bioconductor.org/packages/release/bioc/html/esATAC.html). xwwang@tsinghua.edu.cn. Supplementary data are available at Bioinformatics online.

  8. A Pipelined IP Address Lookup Module for 100 Gbps Line Rates and beyond

    Science.gov (United States)

    Teuchert, Domenic; Hauger, Simon

    New Internet services and technologies call for higher packet switching capacities in the core network. Thus, a performance bottleneck arises at the backbone routers, as forwarding of Internet Protocol (IP) packets requires to search the most specific entry in a forwarding table that contains up to several hundred thousand address prefixes. The Tree Bitmap algorithm provides a well-balanced solution in respect of storage needs as well as of search and update complexity. In this paper, we present a pipelined lookup module based on this algorithm, which allows for an easy adaption to diverse protocol and hardware constraints. We determined the pipelining degree required to achieve the throughput for a 100 Gbps router line card by analyzing a representative sub-unit for various configured sizes. The module supports IPv4 and IPv6 configurations providing this throughput, as we determined the performance of our design to achieve a processing rate of 178 million packets per second.

  9. Statistical analysis on the signals monitoring multiphase flow patterns in pipeline-riser system

    Science.gov (United States)

    Ye, Jing; Guo, Liejin

    2013-07-01

    The signals monitoring petroleum transmission pipeline in offshore oil industry usually contain abundant information about the multiphase flow on flow assurance which includes the avoidance of most undesirable flow pattern. Therefore, extracting reliable features form these signals to analyze is an alternative way to examine the potential risks to oil platform. This paper is focused on characterizing multiphase flow patterns in pipeline-riser system that is often appeared in offshore oil industry and finding an objective criterion to describe the transition of flow patterns. Statistical analysis on pressure signal at the riser top is proposed, instead of normal prediction method based on inlet and outlet flow conditions which could not be easily determined during most situations. Besides, machine learning method (least square supported vector machine) is also performed to classify automatically the different flow patterns. The experiment results from a small-scale loop show that the proposed method is effective for analyzing the multiphase flow pattern.

  10. Increasing honest responding on cognitive distortions in child molesters: the bogus pipeline revisited.

    Science.gov (United States)

    Gannon, Theresa A; Keown, Kirsten; Polaschek, Devon L L

    2007-03-01

    Questionnaires are relied upon by forensic psychologists, clinicians, researchers, and social services to assess child molesters' (CMs') offense-supportive beliefs (or cognitive distortions). In this study, we used an experimental procedure to evaluate whether extrafamilial CMs underreported their questionnaire-assessed beliefs. At time one, 41 CMs were questionnaire-assessed under standard conditions (i.e., they were free to impression manage). At time two, CMs were questionnaire-assessed again; 18 were randomly attached to a convincing fake lie detector (a bogus pipeline), the others were free to impression manage. The results showed that bogus pipeline CMs significantly increased cognitive distortion endorsements compared to their own previous endorsements, and their control counterparts' endorsements. The findings are the first experimental evidence showing that CMs consciously depress their scores on transparent questionnaires.

  11. Mortise terrorism on the main pipelines

    Science.gov (United States)

    Komarov, V. A.; Nigrey, N. N.; Bronnikov, D. A.; Nigrey, A. A.

    2018-01-01

    The research aim of the work is to analyze the effectiveness of the methods of physical protection of main pipelines proposed in the article from the "mortise terrorism" A mathematical model has been developed that made it possible to predict the dynamics of "mortise terrorism" in the short term. An analysis of the effectiveness of physical protection methods proposed in the article to prevent unauthorized impacts on the objects under investigation is given. A variant of a video analytics system has been developed that allows detecting violators with recognition of the types of work they perform at a distance of 150 meters in conditions of complex natural backgrounds and precipitation. Probability of detection is 0.959.

  12. ANALYSIS ON TECHNOLOGICAL PROCESSES CLEANING OIL PIPELINES

    Directory of Open Access Journals (Sweden)

    Mariana PǍTRAŞCU

    2015-05-01

    Full Text Available In this paper the researches are presented concerning the technological processes of oil pipelines.We know several technologies and materials used for cleaning the sludge deposits, iron and manganese oxides, dross, stone, etc.de on the inner walls of drinking water pipes or industries.For the oil industry, methods of removal of waste materials and waste pipes and liquid and gas transport networks are operations known long, tedious and expensive. The main methods and associated problems can be summarized as follows: 1 Blowing with compressed air.2 manual or mechanical brushing, sanding with water or dry.3 Wash with water jet of high pressure, solvent or chemical solution to remove the stone and hard deposits.4 The combined methods of cleaning machines that use water jets, cutters, chains, rotary heads cutters, etc.

  13. NPP pipeline devices improvement by unconventional means

    International Nuclear Information System (INIS)

    Ionajtis, R.R.

    1998-01-01

    The main nontraditional approaches to NPP pipeline devices improvement including complex use of the set of principles and engineering criteria assuring reliability increase, introduction of stepwise throttling, application of alloys with shape memory, creation of principally new valves available for repair with removable (small-sized) drives are considered. It is shown that the problems of valves for NPP may be successfully solved by application of alloys and devices with shape memory which provide high applied forced and deformations, and as a results of which the compactness and complex functionality will be considerably (by the factor of 8-10) improved, i.e. realization of control, transmission, amplifying and actuation functions in a single device is possible. That is of great importance when designing passive safety means

  14. Safety of the medical gas pipeline system

    Directory of Open Access Journals (Sweden)

    Sushmita Sarangi

    2018-01-01

    Full Text Available Medical gases are nowadays being used for a number of diverse clinical applications and its piped delivery is a landmark achievement in the field of patient care. Patient safety is of paramount importance in the design, installation, commissioning, and operation of medical gas pipeline systems (MGPS. The system has to be operational round the clock, with practically zero downtime and its failure can be fatal if not restored at the earliest. There is a lack of awareness among the clinicians regarding the medico-legal aspect involved with the MGPS. It is a highly technical field; hence, an in-depth knowledge is a must to ensure safety with the system.

  15. Modelling asphaltene deposition in turbulent pipeline flows

    Energy Technology Data Exchange (ETDEWEB)

    Eskin, D.; Ratulowski, J.; Akbarzadeh, K.; Pan, S. [Schlumberg DBR Technology Center (Canada)

    2011-06-15

    Asphaltene deposition is one of the important problems of oil production that requires accurate predictive modeling. A model of asphaltene deposition in a turbulent pipe flow is introduced in this paper. A Couette device is employed to perform experiments. There are two major modules in this model. (1) A model of particle size distribution evolution along a pipe - the concept of 'critical particle size' is introduced. Only particles smaller than the critical particle size may deposit. (2) A model of particle transport to the wall. The major mechanism of particle transport to the wall is the Brownian motion. The model developed contains three major tuning parameters that are determined experimentally using a Couette device: particle-particle collision efficiency, particle-wall sticking efficiency, and particle critical size. Performance of the deposition model for a pipeline with the coefficients obtained using a laboratory Couette device is also illustrated in this paper.

  16. REdiii: a pipeline for automated structure solution.

    Science.gov (United States)

    Bohn, Markus Frederik; Schiffer, Celia A

    2015-05-01

    High-throughput crystallographic approaches require integrated software solutions to minimize the need for manual effort. REdiii is a system that allows fully automated crystallographic structure solution by integrating existing crystallographic software into an adaptive and partly autonomous workflow engine. The program can be initiated after collecting the first frame of diffraction data and is able to perform processing, molecular-replacement phasing, chain tracing, ligand fitting and refinement without further user intervention. Preset values for each software component allow efficient progress with high-quality data and known parameters. The adaptive workflow engine can determine whether some parameters require modifications and choose alternative software strategies in case the preconfigured solution is inadequate. This integrated pipeline is targeted at providing a comprehensive and efficient approach to screening for ligand-bound co-crystal structures while minimizing repetitiveness and allowing a high-throughput scientific discovery process.

  17. Achieving Efficiency in Gas Pipeline Connection: Evidence from Ghana

    Directory of Open Access Journals (Sweden)

    Anthony Kudjo Gborgenu

    2016-06-01

    Full Text Available The demand for the use of natural gas is on the increase as an energy source. Natural gas transportation requires a continuous pipeline network from the source of gas across long distance to the various destinations. The main objective involves extending gas pipelines from Takoradi to all the regional capital towns in Ghana to meet the growing demands of its citizenry in order to provide economy and efficiency with regards to cost and environmental sustainability by developing a straight forward method of locating pipeline facilities and designing pipeline networks. The problem is formulated as a network of distances and the solution is presented based on Prim’s Algorithm for minimum connections. Data on distances are obtained from the Ghana Highways Authority. The total distance covered by the pipe line network if the existing road networks were used from Takoradi to all the regional capitals towns in Ghana is 5,094km. After Prim’s Algorithm was used, the total distance covered decreased to 1,590km which is about 68.8% reduction in the distance covered with regards to cost and the environmental damage caused by construction of pipelines (soil, forest, rivers, wetlands, noise from compressor stations during pipeline discharge and risk of pipeline leakage.

  18. Experience with two pipeline river crossings in Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Yaremko, Eugene [Northwest Hydraulic Consultants (NHC), Edmonton (Canada); D' Agnillo, Pablo; Diaz, Jose A. [Minera Alumbrera XTRADA Copper S.A., Buenos Aires (Argentina); Bravo, Claudio

    2009-12-19

    The Alumbrera copper-gold mine located in the Province of Catamarca, northwest region of Argentina, commenced operation in October, 1997. Mine development included a 316 km long, 175 mm diameter slurry pipeline that conveys copper concentrate to a dewatering facility near the city of Tucuman, Province of Tucuman. It became apparent during the first few years of operation that, given the many potential risks of pipeline exposure associated with stream crossings, Minera Alumbrera would have to undertake an aggressive, formal program of risk management of crossings and risk mitigation. In this paper, the experience associated with two crossings is addressed: Rio Villavil; and, Rio Gastona. The original pipeline route through the 10 km length of pipeline connecting Pump Station (PS) 2 to PS 3 was directed along the bottom of the Rio Villavil valley, with most of it located within the flood way of the stream. The exposure of the pipeline at some locations and high risk of further pipeline exposures led to initiation of risk mitigation planning. Remediation work was completed by 2008. Rio Gastona, during the summer of 2001, experienced rapid shifting of the left bank at the crossing resulting in an undermined and unsupported length of pipeline. The subsequent risk mitigation method adopted in 2001 involved the planning and construction of groyne fields along both banks. (author)

  19. Also deputies will say something to new pipeline of Slovnaft

    International Nuclear Information System (INIS)

    Marcan, P.

    2005-01-01

    The oil transit company, Transpetrol, expects the new Bratislava-Schwechat pipeline connecting the OMV refinery to the Druzba pipeline to increase the use of the pipeline and improve company revenues by 20%. The Austrian project partner, OMV, looks to the project to decrease transportation costs for Russian oil. One sixth of the 60 km pipeline will be built in Slovakia, but there is a problem - the Slovak Ministry of Environment and the City of Bratislava have not approved the route proposed by Transpetrol. In their opinion, the propose route would endanger the protected area, Zitny ostrov, that provides drinking water to the capital. Slovnaft also plans a new pipeline to replace the old obsolete one used to transport its products to the mineral oils transhipment centre at Bratislava docks. One of the alternatives proposed by Slovnaft is the construction of a pipeline and transhipment centre on Zitny ostrov. Unlike the Transpetrol project, this has already received approval from the Ministry of Environment. Before construction work on the pipeline to Schwechat can start. OMV will have resolve issues related to the supply of oil from Russia. According to the original plans, Yukos, which owns a 49% stake in Transpetrol, was to supply the oil. But due to tax problems in Russia, Yukos lost its main drilling division, Juganskneftgaz

  20. Condition Monitoring Of Operating Pipelines With Operational Modal Analysis Application

    Directory of Open Access Journals (Sweden)

    Mironov Aleksey

    2015-12-01

    Full Text Available In the petroleum, natural gas and petrochemical industries, great attention is being paid to safety, reliability and maintainability of equipment. There are a number of technologies to monitor, control, and maintain gas, oil, water, and sewer pipelines. The paper focuses on operational modal analysis (OMA application for condition monitoring of operating pipelines. Special focus is on the topicality of OMA for definition of the dynamic features of the pipeline (frequencies and mode shapes in operation. The research was conducted using two operating laboratory models imitated a part of the operating pipeline. The results of finite-element modeling, identification of pipe natural modes and its modification under the influence of virtual failure are discussed. The work considers the results of experimental research of dynamic behavior of the operating pipe models using one of OMA techniques and comparing dynamic properties with the modeled data. The study results demonstrate sensitivity of modal shape parameters to modification of operating pipeline technical state. Two strategies of pipeline repair – with continuously condition-based monitoring with proposed technology and without such monitoring, was discussed. Markov chain reliability models for each strategy were analyzed and reliability improvement factor for proposed technology of monitoring in compare with traditional one was evaluated. It is resumed about ability of operating pipeline condition monitoring by measuring dynamic deformations of the operating pipe and OMA techniques application for dynamic properties extraction.

  1. Pipeline oil fire detection with MODIS active fire products

    Science.gov (United States)

    Ogungbuyi, M. G.; Martinez, P.; Eckardt, F. D.

    2017-12-01

    We investigate 85 129 MODIS satellite active fire events from 2007 to 2015 in the Niger Delta of Nigeria. The region is the oil base for Nigerian economy and the hub of oil exploration where oil facilities (i.e. flowlines, flow stations, trunklines, oil wells and oil fields) are domiciled, and from where crude oil and refined products are transported to different Nigerian locations through a network of pipeline systems. Pipeline and other oil facilities are consistently susceptible to oil leaks due to operational or maintenance error, and by acts of deliberate sabotage of the pipeline equipment which often result in explosions and fire outbreaks. We used ground oil spill reports obtained from the National Oil Spill Detection and Response Agency (NOSDRA) database (see www.oilspillmonitor.ng) to validate MODIS satellite data. NOSDRA database shows an estimate of 10 000 spill events from 2007 - 2015. The spill events were filtered to include largest spills by volume and events occurring only in the Niger Delta (i.e. 386 spills). By projecting both MODIS fire and spill as `input vector' layers with `Points' geometry, and the Nigerian pipeline networks as `from vector' layers with `LineString' geometry in a geographical information system, we extracted the nearest MODIS events (i.e. 2192) closed to the pipelines by 1000m distance in spatial vector analysis. The extraction process that defined the nearest distance to the pipelines is based on the global practices of the Right of Way (ROW) in pipeline management that earmarked 30m strip of land to the pipeline. The KML files of the extracted fires in a Google map validated their source origin to be from oil facilities. Land cover mapping confirmed fire anomalies. The aim of the study is to propose a near-real-time monitoring of spill events along pipeline routes using 250 m spatial resolution of MODIS active fire detection sensor when such spills are accompanied by fire events in the study location.

  2. Accident Prevention and Diagnostics of Underground Pipeline Systems

    Science.gov (United States)

    Trokhimchuk, M.; Bakhracheva, Y.

    2017-11-01

    Up to forty thousand accidents occur annually with underground pipelines due to corrosion. The comparison of the methods for assessing the quality of anti-corrosion coating is provided. It is proposed to use the device to be tied-in to existing pipeline which has a higher functionality in comparison with other types of the devices due to the possibility of tie-in to the pipelines with different diameters. The existing technologies and applied materials allow us to organize industrial production of the proposed device.

  3. Slurry pipelines: economic and political issues. A review

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W. F.

    1977-11-30

    In the controversy surrounding the proposal to grant Federal eminent domain to coal-slurry pipelines, the fundamental issue is whether, on balance, such a grant is in the national interest. The principal subissues (peripheral issues) of economics, water supply and disposal, energy consumption and conservation, employment, safety, and environmental impact are analyzed. It is found that, as compared with unit trains, which are the only immediate alternative for movement of large quantities of Western coal, the pipelines are not against the national interest, except in the case of employment. It is concluded that, on balance, the pipelines are in the national interest and should be granted the power of Federal eminent domain.

  4. Threads Pipelining on the CellBE Systems

    Directory of Open Access Journals (Sweden)

    TANASE, C. A.

    2013-08-01

    Full Text Available This article aims to describe a model to accelerate the execution of a parallel algorithm implemented on a Cell B.E. processor. The algorithm implements a technique of finding a moving target in a maze with dynamic architecture, using another technique of pipelining the data transfers between the PPU and SPU threads. We have shown that by using the pipelining technique, we can achieve an improvement of the computing time (around 40%. It can be also seen that the pipelining technique with one SPU is about as good as the parallel technique with four SPUs.

  5. Development of humidity leak detection system for pipelines of WWER

    International Nuclear Information System (INIS)

    Gonor, V.K.; Morozov, S.A.; Polionov, V.P.; Portyanoj, A.G.; Shvetsov, D.M.; Konoplev, N.I.; Molyavkin, A.N.

    2007-01-01

    With allowance made for the basic requirements for the NPP pipeline leak detection system and for the accumulated experience one analyzed the basic engineering approaches to design a humidity leak detection system for the WWER primary pipelines. Paper presents the results of the feasibility study of the diagnostic algorithm service ability and the leak detection humidity system characteristics. Making use of the Kupol-M code and of the thermal bench simulating the Kalinin NPP 3-rd power unit dull basalt heat insulation pipeline leak the system is shown to meet the basic requirements stipulated in the present-day leak-before-break concept [ru

  6. Dynamically constrained pipeline for tracking neural progenitor cells

    DEFF Research Database (Denmark)

    Vestergaard, Jacob Schack; Dahl, Anders; Holm, Peter

    2013-01-01

    tracking methods are fundamental building blocks of setting up multi purpose pipelines. Segmentation by discriminative dictionary learning and a graph formulated tracking method constraining the allowed topology changes are combined here to accommodate for highly irregular cell shapes and movement patterns...... pipeline by tracking pig neural progenitor cells through a time lapse experiment consisting of 825 images collected over 69 hours. Each step of the tracking pipeline is validated separately by comparison with manual annotations. The number of tracked cells increase from approximately 350 to 650 during...

  7. Assessment of methods in girth welds of steel pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Nagy, G.; Lukacs, J.; Toeroek, I. [Dept. of Mechanical Engineering, Univ. of Miskolc Miskolc-Egyetemvaros (Hungary)

    2005-07-01

    This paper presents two basic methods for the assessment of failed girth welds of steel hydrocarbon transporting pipelines. One of them is based on the principles of linear elastic fracture mechanics (LEFM) and stress intensity factor conception for planar material discontinuities, and the other can be used for the complex assessment of all kinds of occurring defects. The results of the presented methods are compared to the results of burst test of pipeline sections containing a failed girth weld and cut from a Hungarian gas pipeline. (orig.)

  8. TESS Data Processing and Quick-look Pipeline

    Science.gov (United States)

    Fausnaugh, Michael; Huang, Xu; Glidden, Ana; Guerrero, Natalia; TESS Science Office

    2018-01-01

    We describe the data analysis procedures and pipelines for the Transiting Exoplanet Survey Satellite (TESS). We briefly review the processing pipeline developed and implemented by the Science Processing Operations Center (SPOC) at NASA Ames, including pixel/full-frame image calibration, photometric analysis, pre-search data conditioning, transiting planet search, and data validation. We also describe data-quality diagnostic analyses and photometric performance assessment tests. Finally, we detail a "quick-look pipeline" (QLP) that has been developed by the MIT branch of the TESS Science Office (TSO) to provide a fast and adaptable routine to search for planet candidates in the 30 minute full-frame images.

  9. Proof of pipeline strength based on measurements of inspection pigs; Festigkeitsnachweis von Pipelines aufgrund der Messergebnisse von Pruefmolchen

    Energy Technology Data Exchange (ETDEWEB)

    De la Camp, H.J.; Feser, G.; Hofmann, A.; Wolf, B.; Schmidt, H. [TUeV Sueddeutschland Bau und Betrieb GmbH, Muenchen (Germany); Herforth, H.E.; Juengling, K.H.; Schmidt, W. [TUeV Anlagentechnik GmbH, Berlin-Schoeneberg (Germany). Unternehmensgruppe TUeV Rheinland/Berlin-Brandenburg

    2002-01-01

    The report is aimed at collecting and documenting the state of the art and the extensive know how of experts and pipeline operators with regard to judging the structural integrity of pipelines. In order to assess the actual mechanical strength of pipelines based on measurement results obtained by inspection pigs, guidance is given for future processing, which eventually can be used as a basis for an industry standard. A literature study of the commercially available types of inspection pigs describes and synoptically lists the respective pros and cons. In essence the report comprises besides check lists of operating data for the pipeline and the pig runs mainly the evaluation of defects and respective calculating procedures. Included are recommendations regarding maintenance planning, verification of defects as well as repetition of pig runs. (orig.) [German] Ziel des Berichtes ist die Erfassung und Dokumentation zum derzeitigen Stand der Technik und des vorhandenen umfangreichen Know-how von Sachverstaendigen und Pipelinebetreibern auf dem Gebiet der sicherheitstechnischen Beurteilung von Pipelines. Fuer den Festigkeitsnachweis von Pipelines aufgrund der Messergebnisse von Pruefmolchen wurde ein Leitfaden als Basis fuer die zukuenftige Vorgehensweise erstellt, der eventuell die Grundlage eines normativen Regelwerkes bilden kann. In einer Literaturstudie wurden die auf dem Markt befindlichen Pruefmolchtypen zusammenfassend beschrieben und ihre Vor- und Nachteile tabellarisch gegenuebergestellt und bewertet. Neben der Erstellung von Checklisten fuer notwendige Daten zum Betrieb der Pipeline und der Molchlaeufe bildet die Fehlerbewertung mit entsprechenden Berechnungsverfahren den Hauptteil dieses Berichtes. Hinweise zur Instandhaltungsplanung (Fehlerverifikation und Molchlaufwiederholung) werden gegeben. (orig.)

  10. Pipeline integrity management using Monte Carlo simulation; A aplicacao do metodo de Monte Carlo no gerenciamento da integridade de dutos

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, Claudio; Costa, Artur; Bittencourt, Euclides [TRANSPETRO - PETROBRAS Transporte, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Due to the growing relevance of safety and environmental protection policies in PETROBRAS and its subsidiaries, as well as official regulatory agencies and population requirements, integrity management of oil and gas pipelines became a priority activity in TRANSPETRO, involving several sectors of the company's Support Management Department. Inspection activities using intelligent PIGs, field correlations and replacement of pipeline segments are known as high cost operations and request complex logistics. Thus, it is imperative the adoption of management tools that optimize the available resources. This study presents Monte Carlo simulation method as an additional tool for evaluation and management of pipeline structural integrity. The method consists in foreseeing future physical conditions of most significant defects found in intelligent PIG In Line Inspections based on a probabilistic approach. Through Monte Carlo simulation, probability functions of failure for each defect are produced, helping managers to decide which repairs should be executed in order to reach the desired or accepted risk level. The case that illustrates this study refers to the reconditioning of ORSOL 14'' (35,56 mm) pipeline. This pipeline was constructed to transfer petroleum from Urucu's production fields to Solimoes port, in Coari, city in Brazilian Amazon Region. The result of this analysis indicated critical points for repair, in addition to the results obtained by the conventional evaluation (deterministic ASME B-31G method). Due to the difficulties to mobilize staff and execute necessary repairs in remote areas like Amazon forest, the probabilistic tool was extremely useful, improving pipeline integrity level and avoiding future additional costs. (author)

  11. The pipeline system for Octave and Matlab (PSOM): a lightweight scripting framework and execution engine for scientific workflows.

    Science.gov (United States)

    Bellec, Pierre; Lavoie-Courchesne, Sébastien; Dickinson, Phil; Lerch, Jason P; Zijdenbos, Alex P; Evans, Alan C

    2012-01-01

    The analysis of neuroimaging databases typically involves a large number of inter-connected steps called a pipeline. The pipeline system for Octave and Matlab (PSOM) is a flexible framework for the implementation of pipelines in the form of Octave or Matlab scripts. PSOM does not introduce new language constructs to specify the steps and structure of the workflow. All steps of analysis are instead described by a regular Matlab data structure, documenting their associated command and options, as well as their input, output, and cleaned-up files. The PSOM execution engine provides a number of automated services: (1) it executes jobs in parallel on a local computing facility as long as the dependencies between jobs allow for it and sufficient resources are available; (2) it generates a comprehensive record of the pipeline stages and the history of execution, which is detailed enough to fully reproduce the analysis; (3) if an analysis is started multiple times, it executes only the parts of the pipeline that need to be reprocessed. PSOM is distributed under an open-source MIT license and can be used without restriction for academic or commercial projects. The package has no external dependencies besides Matlab or Octave, is straightforward to install and supports of variety of operating systems (Linux, Windows, Mac). We ran several benchmark experiments on a public database including 200 subjects, using a pipeline for the preprocessing of functional magnetic resonance images (fMRI). The benchmark results showed that PSOM is a powerful solution for the analysis of large databases using local or distributed computing resources.

  12. The pipeline system for Octave and Matlab (PSOM: a lightweight scripting framework and execution engine for scientific workflows

    Directory of Open Access Journals (Sweden)

    Pierre eBellec

    2012-04-01

    Full Text Available The analysis of neuroimaging databases typically involves a large number of inter-connected steps called a pipeline. The pipeline system for Octave and Matlab (PSOM is a flexible framework for the implementation of pipelines in the form of Octave or Matlab scripts. PSOM does not introduce new language constructs to specify the steps and structure of the workflow. All steps of analysis are instead described by a regular Matlab data structure, documenting their associated command and options, as well as their input, output and cleaned-up files. The PSOM execution engine provides a number of automated services: (1 it executes jobs in parallel on a local computing facility as long as the dependencies between jobs allow for it and sufficient resources are available; (2 it generates a comprehensive record of the pipeline stages and the history of execution, which is detailed enough to fully reproduce the analysis; (3 if an analysis is started multiple times, it executes only the parts of the pipeline that need to be reprocessed. PSOM is distributed under an opensource MIT license and can be used without restriction for academic or commercial projects. The package has no external dependencies besides Matlab or Octave, is straightforward to install and supports of variety of operating systems (Linux, Windows, Mac. We ran several benchmark experiments on a public database including 200 subjects, using a pipeline for the preprocessing of functional magnetic resonance images. The benchmark results showed that PSOM is a powerful solution for the analysis of large databases using local or distributed computing resources.

  13. A Bridge to the Stars: A Model High School-to-College Pipeline to Improve Diversity in STEM

    Science.gov (United States)

    McIntosh, Daniel H.; Jennings, Derrick H.

    2017-01-01

    Increasing participation by historically underrepresented Americans in the STEM workforce remains a national priority. Existing strategies have failed to increase diversity especially in the physical sciences despite federal mandates. To meet this urgent challenge, it is imperative to immediately identify and support the expansion of effective high school-to-college STEM pipelines. A Bridge to the Stars (ABttS) is a creative and tested pipeline designed to steadily increase the numbers of disadvantaged 15-21 year-olds pursuing and completing 4-year STEM degrees. This unique program offers extended engagement in astronomy, arguably the most accessible window to science, through a 3-tier STEM immersion program of innovative learning (in a freshman science course), authentic research training (in a freshman science lab), and supportive near-peer mentoring at U.Missouri-Kansas City, an urban research university. Each tier of the ABttS pipeline by itself has the potential to broaden student aspirations for careers as technological innovators or STEM educators. Students who elect to transition through multiple tiers will substantially reinforce their successes with STEM activities, and significantly bolster their self-esteem necessary to personally manifest STEM aspirations. We will summarize the impact of this program after 5 years, and share our latest improvements. The long-term mission of ABttS is to see urban educational institutions across the U.S. adopt similar pipelines in all STEM disciplines built on the ABttS model.

  14. 30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.

    Science.gov (United States)

    2010-07-01

    ... and Pipeline Rights-of-Way § 250.1003 Installation, testing, and repair requirements for DOI pipelines... than 1 year. (2) Prior to returning a pipeline to service after a repair, the pipeline shall be... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Installation, testing, and repair requirements...

  15. 77 FR 21763 - Explorer Pipeline Company; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2012-04-11

    ... pipeline extension project (Diluent Extension Project). The Diluent Extension Project involves the construction of a new pipeline segment from Peotone, Illinois to Manhattan, Illinois, where Explorer's pipeline system will interconnect with Enbridge's Southern Lights pipeline. This extension project will offer a...

  16. 30 CFR 250.1004 - Safety equipment requirements for DOI pipelines.

    Science.gov (United States)

    2010-07-01

    ... subsea tie-in shall be equipped with only a block valve. (7) Gas-lift or water-injection pipelines on... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of... a flow safety valve (FSV). (ii) For sulphur operations, incoming pipelines delivering gas to the...

  17. Technological alternative on environmental management for pipeline installation in the Amazon

    Energy Technology Data Exchange (ETDEWEB)

    Frade, Amadeu Farage; Teixeira, Ivan Jose [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Riquena, Renata Maria; Freitas, Wanderleia Isabel P. de [CONCREMAT, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Usually pipelines construction are located in isolated places which are difficult to access. Due this characteristic the logistical support services are not available as easily as it is in large centers. Even so these enterprises may not release these services mainly due to high demand from stakeholders and the commitment to quality that these pipelines are submitted. This work presents some alternatives in environmental management implemented during an installation of pipelines in the Amazon forest with emphasis on the quality of water bodies and correct effluents destination. Located in western Amazonia in a region with several restrictions like: logistics, low supply of skilled labor and high environmental requirements. The project aligned competence and creativity since from its planning until its delivery to overcome difficulties and meet the demands of stakeholders. Usual techniques to assist legal requirements such as effluent treatment and environmental monitoring had to be adapted to the Amazon reality, always seeking for balance between technical and alignment economic and respect for social and environmental aspects. Using the methodology of 'wetland' (system of alternative treatment of effluents, based on the use of regional plants - macrophytes), the reuse of sludge from sewage treatment station, floating sewage treatment system, was crucial to meet the challenge to deploy this product to work in Amazonia. The aim of this work is to disseminate the techniques used and help other enterprises with the same challenges. (author)

  18. Dynamics of a Pipeline under the Action of Internal Shock Pressure

    Science.gov (United States)

    Il'gamov, M. A.

    2017-11-01

    The static and dynamic bending of a pipeline in the vertical plane under the action of its own weight is considered with regard to the interaction of the internal pressure with the curvature of the axial line and the axisymmetric deformation. The pressure consists of a constant and timevarying parts and is assumed to be uniformly distributed over the entire span between the supports. The pipeline reaction to the stepwise increase in the pressure is analyzed in the case where it is possible to determine the exact solution of the problem. The initial stage of bending determined by the smallness of elastic forces as compared to the inertial forces is introduced into the consideration. At this stage, the solution is sought in the form of power series and the law of pressure variation can be arbitrary. This solution provides initial conditions for determining the further process. The duration of the inertial stage is compared with the times of sharp changes of the pressure and the shock waves in fluids. The structure parameters are determined in the case where the shock pressure is accepted only by the inertial forces in the pipeline.

  19. Residual strength evaluation of corroded pipelines with long defects based upon limit load analysis

    Energy Technology Data Exchange (ETDEWEB)

    Chiodo, Mario S.G.; Ruggieri, Claudio [Universidade de Sao Paulo (USP), SP (Brazil). Dept. de Arquitetura Naval e Engenharia Oceanica

    2009-07-01

    Accurate evaluation of the residual strength for corroded pipes remains essential in fitness for service analyses, including repair decisions and life-extension programs, of onshore and offshore oil and gas transportation. As the pipeline infrastructure ages, material loss due to corrosion represents one of the main degradation factors of steel pipes which leads to strength reduction and potential catastrophic failures. Current high resolution methods can precisely measure the geometry of corrosion defects. Despite the improvement of those techniques, they are insufficient to ensure high levels of reliability in the burst pressure assessment because the recognized semi-empirical nature of conventional procedures. This work studies the applicability of a stress based criterion based upon plastic instability to predict the burst pressure of pipelines with axial corrosion defects. Verification studies based on experimental burst tests of large diameter pipes made of API X65 and X100 steels with different defect length showed the effectiveness of the proposed criterion based on {sigma}{sup ref} ={eta}{sigma}{sub u} in failure predictions, even though the {eta} factor exhibits a potential strong dependence of the defect geometry and material properties. In general, the results presented here provide an effective support to the ability of the proposed stress based criterion in the integrity assessment of corroded pipelines. (author)

  20. Alarm management in gas pipeline plant: a case study

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Juliano; Lima, Marcelo; Leitao, Gustavo; Guedes, Luiz Affonso [Universidade Federal do Rio Grande do Norte (UFRN), Natal, RN (Brazil); Branco, Nicolau; Coelho, Robson; Elias, Gustavo Passos; Nunes, Marcelo [Transportadora Brasileira Gasoduto Bolivia-Brasil (TBG), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    In order to improve the requirements of industrial processes, many decision support systems have been introduced in recent years. In this context, the alarm management systems have great relevance. On the other hand, the informatics revolution allowed a great increase of information concerning the operation of the industrial processes. Currently, process operators handle an excessive number of about 1.500 alarms per day. Thus, this overdose of information implies in the discredit of alarms. Then, in order to improve the operation activities of industrial processes, it is mandatory to incorporate procedures to evaluate and rationalize alarms. Since the EMMUA191 Standard is the reference guide to alarm management, but it does not specify how to execute an alarm management procedure, in this paper, a systematic procedure to evaluate alarms configurations in industrial processes is proposed. This procedure is in line with EMMUA191 and is composed by the following steps: to use statistics analyses to identify problematic alarms, such as occurrence, intermittency, correlation, and flooding calculation; to indicate problematic alarm group; and to propose a set of actions to be implemented. To validate our proposal, we present a case study in a gas pipeline plant using the BR-AlarmExpert software. (author)

  1. Barriers in the Physics Pipeline from K-12 to Tenure

    Science.gov (United States)

    Kilburn, Micha

    2016-09-01

    The lack of diversity in physics is a known problem, and yet efforts to change our demographics have only had minor effects during the last decade. I will explain some of the hidden barriers that dissuade underrepresented minorities in becoming physicists using a framework borrowed from sociology, Maslow's hierarchy of needs. I will draw from current research at the undergraduate to faculty levels over a variety of STEM fields that are also addressing a lack of diversity. I will also provide analysis from the Joint Institute for Nuclear Astrophysics Center for the Evolution of Elements (JINA-CEE) outreach programs to understand the likelihood of current K-12 students in becoming physicists. Specifically, I will present results from the pre-surveys from our Art 2 Science Camps (ages 8-14) about their attitudes towards science as well as results from analysis of teacher recommendations for our high school summer program. I will conclude with a positive outlook describing the pipeline created by JINA-CEE to retain students from middle school through college. This work was supported in part by the National Science Foundation under Grant No. PHY-1430152 (JINA Center for the Evolution of the Elements).

  2. Outfall Pipeline Lines, Tutuila AS, 2009, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — The outfalls extend from coastal points, originating from canneries and sewage treatment plants.Tafuna Outfall: This polyethylene pipeline installed in 1996, is...

  3. The Kepler Science Data Processing Pipeline Source Code Road Map

    Science.gov (United States)

    Wohler, Bill; Jenkins, Jon M.; Twicken, Joseph D.; Bryson, Stephen T.; Clarke, Bruce Donald; Middour, Christopher K.; Quintana, Elisa Victoria; Sanderfer, Jesse Thomas; Uddin, Akm Kamal; Sabale, Anima; hide

    2016-01-01

    We give an overview of the operational concepts and architecture of the Kepler Science Processing Pipeline. Designed, developed, operated, and maintained by the Kepler Science Operations Center (SOC) at NASA Ames Research Center, the Science Processing Pipeline is a central element of the Kepler Ground Data System. The SOC consists of an office at Ames Research Center, software development and operations departments, and a data center which hosts the computers required to perform data analysis. The SOC's charter is to analyze stellar photometric data from the Kepler spacecraft and report results to the Kepler Science Office for further analysis. We describe how this is accomplished via the Kepler Science Processing Pipeline, including, the software algorithms. We present the high-performance, parallel computing software modules of the pipeline that perform transit photometry, pixel-level calibration, systematic error correction, attitude determination, stellar target management, and instrument characterization.

  4. Weld Design, Testing, and Assessment Procedures for High Strength Pipelines

    Science.gov (United States)

    2011-12-20

    Long-distance high-strength pipelines are increasingly being constructed for the efficient transportation of energy products. While the high-strength linepipe steels and high productivity welding processes are being applied, the procedures employed f...

  5. Smart pipeline network : pipe and repair sensor system.

    Science.gov (United States)

    2013-07-26

    Leak detection within the national pipeline network has long been recognized as a much-needed : capability to reduce the loss of high value product, improve public safety, and to reduce the : emissions of environmentally damaging substances. : In rec...

  6. Onset of scour below pipelines and self-burial

    DEFF Research Database (Denmark)

    Sumer, B. Mutlu; Truelsen, Christoffer; Sichmann, T.

    2001-01-01

    This paper summarizes the results of an experimental study on the onset of scour below and self-burial of pipelines in currents/waves. Pressure was measured on the surface of a slightly buried pipe at two points, one at the upstream side and the other at the downstream side of the pipe, both...... in the sand bed. The latter enabled the pressure gradient (which drives a seepage flow underneath the pipe) to be calculated. The results indicated that the excessive seepage flow and the resulting piping are the major factor to cause the onset of scour below the pipeline. The onset of scour occurred always...... locally (but not along the length of the pipeline as a two-dimensional process). The critical condition corresponding to the onset of scour was determined both in the case of currents and in the case of waves. Once the scour breaks out, it will propagate along the length of the pipeline, scour holes being...

  7. Selection bias in the reported performances of AD classification pipelines

    Directory of Open Access Journals (Sweden)

    Alex F. Mendelson

    2017-01-01

    Full Text Available The last decade has seen a great proliferation of supervised learning pipelines for individual diagnosis and prognosis in Alzheimer's disease. As more pipelines are developed and evaluated in the search for greater performance, only those results that are relatively impressive will be selected for publication. We present an empirical study to evaluate the potential for optimistic bias in classification performance results as a result of this selection. This is achieved using a novel, resampling-based experiment design that effectively simulates the optimisation of pipeline specifications by individuals or collectives of researchers using cross validation with limited data. Our findings indicate that bias can plausibly account for an appreciable fraction (often greater than half of the apparent performance improvement associated with the pipeline optimisation, particularly in small samples. We discuss the consistency of our findings with patterns observed in the literature and consider strategies for bias reduction and mitigation.

  8. Leadership Pipeline – en neo-weberiansk revitalisering af bureaukratiet?

    DEFF Research Database (Denmark)

    Dahl, Kristian Aagaard; Nielsen, Jeppe

    2015-01-01

    Selvom Leadership Pipeline har vundet indpas i mange private og offentlige organisationer, er den akademiske litteratur om ledelsesmodellen indtil videre forbavsende beskeden. I denne artikel søger vi at indkredse svar på, hvorvidt Leadership Pipeline udgør et (gammeldags) bureaukratisk perspektiv...... på ledelse. Vores dokumentanalyse viser, at Leadership Pipeline modellen bygger på weberianske og neo-weberianske principper om klare over-/underordnelsesforhold og faste referencestrukturer. Samtidig viser en nøjere granskning, at modellen også inkluderer andre ledelsesdyder med betoning af...... meningsskabelse, innovation, helhedsorientering og ledelse på tværs. Det leder os til at foreslå, at Leadership Pipeline modellen i dens udtryksform udviser ambidekstrale træk, hvor weberianske og neo- weberianske principper søges koblet med tilsyneladende modsatrettede, postmoderne ledelsesforståelser. Vi...

  9. Digital Imaging of Pipeline Mechanical Damage and Residual Stress

    Science.gov (United States)

    2010-02-19

    The purpose of this program was to enhance characterization of mechanical damage in pipelines through application of digital eddy current imaging. Lift-off maps can be used to develop quantitative representations of mechanical damage and magnetic per...

  10. Pipeline, utilities to spend $127 million on scada systems

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Spending for new or upgraded supervisory control and data acquisition (scada) systems and for additional remote-terminal units (RTUs) by North American pipelines and utilities will exceed $165 million through February 1996. New and updated scada systems will total 122 at a cost of more than $127 million; 143 RTU add-on projects will cost more than $38 million. Pipelines and combined utilities/pipelines will spend $89.5 million for 58 scada-system projects and $30.2 million for RTU add-on projects. Scada systems are computerized hardware and software systems that perform monitoring and control functions. In gas utilities, these systems perform functions normally associated with gas transmission and distribution as well as production-plant process control. In gas and oil pipelines, the systems perform these functions as well as such specialized functions as batch tracking, leak detection, and gas load flow

  11. 76 FR 5494 - Pipeline Safety: Mechanical Fitting Failure Reporting Requirements

    Science.gov (United States)

    2011-02-01

    ...: Mechanical Fitting Failure Reporting Requirements AGENCY: Pipeline and Hazardous Materials Safety... fittings involved in the compression coupling failure information collection; changes the term ``compression coupling'' to ``mechanical fitting,'' aligns a threat category with the annual report; and...

  12. Sustainability of social-environmental programs along pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Doebereiner, Christian [Shell Southern Cone Gas and Power (Brazil); Herrera, Brigitte [Transredes S.A. (Bolivia)

    2005-07-01

    The sustainability of Social and Environmental programs along pipelines, have shown to be a major challenge. Gas pipelines in Bolivia and Brazil operate in a diversity of environments and communities with different cultures, values and expectations. However, the pipeline network can also provide opportunities for contributing to regional development and working with local populations on topics of mutual interest. Many of these are quite strategic because they arise from topics of mutual interest for both the company and neighboring populations, and because they provide opportunities for achieving results of mutual benefit. These opportunities could include helping to make gas available to local communities, contributions to urban planning, hiring local services and other initiatives. Sustainable and integrated Social and Environmental programs are therefore key to a successful pipeline operation. These opportunities are often missed or under valued. Some successful examples are presented from Transredes S.A., Bolivia. (author)

  13. Pipeline corridors through wetlands - impacts on plant communities: Cassadaga Creek Tributary Crossing, Gerry Township, Chautauqua County, New York. Topical report, August 1992--November 1993

    Energy Technology Data Exchange (ETDEWEB)

    Shem, L.M.; Van Dyke, G.D.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted over the period of August 3-4, 1992, at the Cassadaga wetlands crossing in Gerry Township, Chautauqua County, New York. The pipeline at this site was installed during February and March 1981. After completion of pipeline installation, the ROW was fertilized, mulched, and seeded with annual ryegrass. Two adjacent sites were surveyed in this study: a forested wetland and an emergent wetlands Eleven years after pipeline installation, the ROW at both sites supported diverse vegetative communities. Although devoid of large woody species, the ROW within the forested wetland had a dense vegetative cover. The ROW within the emergent wetland had a slightly less dense and more diverse vegetative community compared with that in the adjacent natural areas (NAs). The ROW within the emergent wetland also had a large number of introduced species that were not present in the adjacent NAs. The ROW, with its emergent marsh plant community, provided habitat diversity within the forested wetlands Because the ROW contained species not found within the adjacent NAs, overall species diversity was increased.

  14. Research on Connection and Function Reliability of the Oil&Gas Pipeline System

    Directory of Open Access Journals (Sweden)

    Xu Bo

    2017-01-01

    Full Text Available Pipeline transportation is the optimal way for energy delivery in terms of safety, efficiency and environmental protection. Because of the complexity of pipeline external system including geological hazards, social and cultural influence, it is a great challenge to operate the pipeline safely and reliable. Therefore, the pipeline reliability becomes an important issue. Based on the classical reliability theory, the analysis of pipeline system is carried out, then the reliability model of the pipeline system is built, and the calculation is addressed thereafter. Further the connection and function reliability model is applied to a practical active pipeline system, with the use of the proposed methodology of the pipeline system; the connection reliability and function reliability are obtained. This paper firstly presented to considerate the connection and function reliability separately and obtain significant contribution to establish the mathematical reliability model of pipeline system, hence provide fundamental groundwork for the pipeline reliability research in the future.

  15. The restorationof the dilapidated pipelines using compressed plastic pipes

    Directory of Open Access Journals (Sweden)

    Orlov Vladimir Aleksandrovich

    2014-02-01

    Full Text Available The article provides the information on a promising technology for trenchless repair named Swagelining, which supposes pulling into the old pipeline the new polymer with its preliminary thermo-mechanical compression and further straightening. The coauthors present the results of the calculations determining the thickness of the polyethylene pipes after compression and straightening in the old pipeline depending on the initial diameter in case of different ratio of the diameter to the wall thickness (SDR and the dynamics of the changes in hydraulic performance after repair work on the pipeline using the method Swagelining. The concept of the energy saving potential is formed in addition to a no-dig repair for pressure piping systems, water supply, and its magnitude. On the basis of the research results, the authors formulate the principles of the energy efficiency potential after the implementation of the trenchless technology of drawing the old pipeline with new polymer pipes with their preliminary thermo-mechanical compression and subsequent area enlargement. The technology Swagelining is described and the authors develop a mathematical model that illustrates the behavior of the pipeline in the process of shrink operations. Such parameters are analyzed as changing the diameter of the pipeline at thermo-mechanical compression, the hydraulic parameters of the new (polymer and old (steel pipelines, energy savings on one-meter length of the pipeline. The calculated values of the electric power economy on the whole length of the pipeline repair section with a corresponding flow of transported waters.The characteristics and capabilities of the technology of trenchless renovation Swagelining allows achieving simultaneously the effect of resource saving (eliminationof the defects and, as a consequence, of water leakage and energy saving (reduction in the water transportation cost.A numerical example of the old steel pipeline renovation shows the

  16. Energy geopolitics and Iran-Pakistan-India gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Shiv Kumar [Political Geography Division, Center for International Politics, Organization and Disarmament, School of International Studies, Jawaharlal Nehru University, New Delhi 110067 (India)]. E-mail: vermajnu@gmail.com

    2007-06-15

    With the growing energy demands in India and its neighboring countries, Iran-Pakistan-India (IPI) gas pipeline assumes special significance. Energy-deficient countries such as India, China, and Pakistan are vying to acquire gas fields in different parts of the world. This has led to two conspicuous developments: first, they are competing against each other and secondly, a situation is emerging where they might have to confront the US and the western countries in the near future in their attempt to control energy bases. The proposed IPI pipeline is an attempt to acquire such base. However, Pakistan is playing its own game to maximize its leverages. Pakistan, which refuses to establish even normal trading ties with India, craves to earn hundreds of millions of dollars in transit fees and other annual royalties from a gas pipeline which runs from Iran's South Pars fields to Barmer in western India. Pakistan promises to subsidize its gas imports from Iran and thus also become a major forex earner. It is willing to give pipeline related 'international guarantees' notwithstanding its record of covert actions in breach of international law (such as the export of terrorism) and its reluctance to reciprocally provide India what World Trade Organization (WTO) rules obligate it to do-Most Favored Nation (MFN) status. India is looking at the possibility of using some set of norms for securing gas supply through pipeline as the European Union has already initiated a discussion on the issue. The key point that is relevant to India's plan to build a pipeline to source gas from Iran relates to national treatment for pipeline. Under the principle of national treatment which also figures in relation to foreign direct investment (FDI), the country through which a pipeline transits should provide some level of security to the transiting pipeline as it would have provided to its domestic pipelines. This paper will endeavor to analyze, first, the significance of this

  17. Tunnels: different construction methods and its use for pipelines installation

    Energy Technology Data Exchange (ETDEWEB)

    Mattos, Tales; Soares, Ana Cecilia; Assis, Slow de; Bolsonaro, Ralfo; Sanandres, Simon [Petroleo do Brasil S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    In a continental dimensions country like Brazil, the pipeline modal faces the challenge of opening ROW's in the most different kind of soils with the most different geomorphology. To safely fulfill the pipeline construction demand, the ROW opening uses all techniques in earthworks and route definition and, where is necessary, no digging techniques like horizontal directional drilling, micro tunneling and also full size tunnels design for pipelines installation in high topography terrains to avoid geotechnical risks. PETROBRAS has already used the tunnel technique to cross higher terrains with great construction difficult, and mainly to make it pipeline maintenance and operation easier. For the GASBOL Project, in Aparados da Serra region and in GASYRG, in Bolivia, two tunnels were opened with approximately 700 meters and 2,000 meters each one. The GASBOL Project had the particularity of being a gallery with only one excavation face, finishing under the hill and from this point was drilled a vertical shaft was drilled until the top to install the pipeline section, while in GASYRG Project the tunnel had two excavation faces. Currently, two projects are under development with tunnels, one of then is the Caraguatatuba-Taubate gas pipeline (GASTAU), with a 5 km tunnel, with the same concepts of the GASBOL tunnel, with a gallery to be opened with the use of a TBM (Tunneling Boring Machine), and a shaft to the surface, and the gas pipeline Cabiunas-Reduc III (GASDUC III) project is under construction with a 3.7 km tunnel, like the GASYRG tunnel with two faces. This paper presents the main excavation tunneling methods, conventional and mechanized, presenting the most relevant characteristics from both and, in particular, the use of tunnels for pipelines installation. (author)

  18. Wireless Sensor Networks for Long Distance Pipeline Monitoring

    OpenAIRE

    Augustine C. Azubogu; Victor E. Idigo; Schola U. Nnebe; Obinna S. Oguejiofor; Simon E.

    2013-01-01

    The main goal of this seminal paper is to introduce the application of Wireless Sensor Networks (WSN) in long distance infrastructure monitoring (in particular in pipeline infrastructure monitoring) – one of the on-going research projects by the Wireless Communication Research Group at the department of Electronic and Computer Engineering, Nnamdi Azikiwe University, Awka. The current sensor network architectures for monitoring long distance pipeline infrastructures are pr...

  19. Pipeline negotiations as a challenging setting for organised cultural encounters

    DEFF Research Database (Denmark)

    Guerrieri, Valeria

    Within the context of resource extraction, cultural encounters have been historically performed in the way of more or less antagonistic social interactions, ranging from outright domination to more empowerment-oriented relations. Throughout the last decades, the building of pipelines in particula...... of cultural diversities and divergent perspectives on energy development and indigenous issues; b) a unique social space that has contributed to trigger phenomenon of identity transformation and new ways of structuring relations among the several pipeline stakeholders....

  20. Optimal Energy Consumption Analysis of Natural Gas Pipeline

    OpenAIRE

    Liu, Enbin; Li, Changjun; Yang, Yi

    2014-01-01

    There are many compressor stations along long-distance natural gas pipelines. Natural gas can be transported using different boot programs and import pressures, combined with temperature control parameters. Moreover, different transport methods have correspondingly different energy consumptions. At present, the operating parameters of many pipelines are determined empirically by dispatchers, resulting in high energy consumption. This practice does not abide by energy reduction policies. There...

  1. Optimal processor assignment for pipeline computations

    Science.gov (United States)

    Nicol, David M.; Simha, Rahul; Choudhury, Alok N.; Narahari, Bhagirath

    1991-01-01

    The availability of large scale multitasked parallel architectures introduces the following processor assignment problem for pipelined computations. Given a set of tasks and their precedence constraints, along with their experimentally determined individual responses times for different processor sizes, find an assignment of processor to tasks. Two objectives are of interest: minimal response given a throughput requirement, and maximal throughput given a response time requirement. These assignment problems differ considerably from the classical mapping problem in which several tasks share a processor; instead, it is assumed that a large number of processors are to be assigned to a relatively small number of tasks. Efficient assignment algorithms were developed for different classes of task structures. For a p processor system and a series parallel precedence graph with n constituent tasks, an O(np2) algorithm is provided that finds the optimal assignment for the response time optimization problem; it was found that the assignment optimizing the constrained throughput in O(np2log p) time. Special cases of linear, independent, and tree graphs are also considered.

  2. Natural gas pipelines: emerging market challenges

    International Nuclear Information System (INIS)

    Smart, A.; Balfe, P

    2001-01-01

    The Australian gas industry has come a long way in recent years. Most of the formerly government owned gas transmission, distribution and retail businesses have been privatised; major utility companies have been fundamentally restructured; the convergence of energy markets has seen many companies stepping outside the boundaries of their traditional businesses; and national competition policy has led to profound changes in the regulatory landscape. Yet despite the magnitude of these changes, it is clear that the journey of competitive reform has a long way to go. The Australian Gas Association's Industry Development Strategy identifies the potential for gas to increase its share of Australia's primary energy market, from around 18 percent at present to 22 percent by 2005, and 28 percent by 2015. Our analysis, using ACIL's Eastern Australian Gas Model, clearly shows that in the absence of major new sources of gas, these challenging targets will not be met and, indeed, there will be an increasing supply shortfall. However, with the emergence of new competitive supply sources such as Papua New Guinea and the Timor Sea, our modelling suggests that most of this demand can be satisfied at prices which will maintain gas' competitiveness in energy markets. Such developments provide both opportunities and challenges for the industry. In particular, they will profoundly affect the owners and operators of transmission pipeline systems. (Authors)

  3. The VLITE Post-Processing Pipeline

    Science.gov (United States)

    Richards, Emily E.; Clarke, Tracy; Peters, Wendy; Polisensky, Emil; Kassim, Namir E.

    2018-01-01

    A post-processing pipeline to adaptively extract and catalog point sources is being developed to enhance the scientific value and accessibility of data products generated by the VLA Low-band Ionosphere and Transient Experiment (VLITE; ) on the Karl G. Jansky Very Large Array (VLA). In contrast to other radio sky surveys, the commensal observing mode of VLITE results in varying depths, sensitivities, and spatial resolutions across the sky based on the configuration of the VLA, location on the sky, and time on source specified by the primary observer for their independent science objectives. Therefore, previously developed tools and methods for generating source catalogs and survey statistics are not always appropriate for VLITE's diverse and growing set of data. A raw catalog of point sources extracted from every VLITE image will be created from source fit parameters stored in a queryable database. Point sources will be measured using the Python Blob Detector and Source Finder software (PyBDSF; Mohan & Rafferty 2015). Sources in the raw catalog will be associated with previous VLITE detections in a resolution- and sensitivity-dependent manner, and cross-matched to other radio sky surveys to aid in the detection of transient and variable sources. Final data products will include separate, tiered point source catalogs grouped by sensitivity limit and spatial resolution.

  4. Delivering Data Reduction Pipelines to Science Users

    Science.gov (United States)

    Freudling, Wolfram

    2015-12-01

    Producing science data products that can be used to extract science is the ultimate objective of astronomical observation. The complexity of modern instruments require highly specialized algorithms for data organization and data reduction. Data visualization and user interaction, both to fine tune individual algorithms and to modify the data flow itself, are essential for the production of science grade products that fully exploits the potential of the raw data. ESO has a long history of providing specialized algorithms called recipes for each of its instruments. ESOREFLEX is an environment to deliver complete data reduction workflows that include these recipes to the users. These workflows encapsulate the best practise data reduction for the data from a particular instrument, and at the same can easily be modified by the user. ESOREFLEX includes systems for automatic data organization and visualization, interaction with recipes, and the exploration of the provenance tree of intermediate and final data products. ESOREFLEX allows ESO to deliver recipes that are used in its unsupervised operational pipelines to [...

  5. IN-SITU TEST OF PRESSURE PIPELINE VIBRATION BASED ON DATA ACQUISITION AND SIGNAL PROCESSING

    OpenAIRE

    Hou, Huimin; Xu, Cundong; Liu, Hui; Wang, Rongrong; Jie, Junkun; Ding, Lianying

    2015-01-01

    Pipeline vibration of high frequency and large amplitude is an important factor that impacts the safe operation of pumping station and the efficiency of the pumps. Through conducting the vibration in-situ test of pipeline system in the pumping station, we can objectively analyze the mechanism of pipeline vibration and evaluate the stability of pipeline operation. By using DASP (data acquisition & signal processing) in the in-situ test on the 2# pipeline of the third pumping station in the gen...

  6. Seismic response of buried pipelines: a state-of-the-art review

    International Nuclear Information System (INIS)

    Datta, T.K.

    1999-01-01

    A state-of-the-art review of the seismic response of buried pipelines is presented. The review includes modeling of soil-pipe system and seismic excitation, methods of response analysis of buried pipelines, seismic behavior of buried pipelines under different parametric variations, seismic stresses at the bends and intersections of network of pipelines. pipe damage in earthquakes and seismic risk analysis of buried pipelines. Based on the review, the future scope of work on the subject is outlined. (orig.)

  7. Cost benefit analysis for failure of sewer pipelines

    Directory of Open Access Journals (Sweden)

    Elmasry Mohamed

    2017-01-01

    Full Text Available Sewer pipelines failure in sewage networks can have adverse potential impacts on socio-economic aspects in any community. Due to the fact that it’s difficult to capture the relationship between the physical and economical aspects as a result of critical sewer pipelines failure, economic concepts are used to evaluate the economic loss as a result of these failures. In this paper an analysis for the costs resulting from sewer pipelines failure and the benefits achieved from avoiding failures are presented. The costs included in the cost benefit analysis are the direct costs used to reinstate failed pipelines and the indirect costs, borne by the society and economy. In the benefits analysis, only the tangible and measurable benefits limited to the health sector and preventing diseases are addressed in this paper. It is expected that the proposed approach could help in estimating the economic losses due to sewer pipelines failure especially for the intangible factors that are difficult to measure. In addition it could help decision makers in taking necessary measures to preserve critical assets that could have adverse potential impacts on valuable natural resources such as surface and groundwater and soil surrounding failed pipelines.

  8. Hollow-core fiber sensing technique for pipeline leak detection

    Science.gov (United States)

    Challener, W. A.; Kasten, Matthias A.; Karp, Jason; Choudhury, Niloy

    2018-02-01

    Recently there has been increased interest on the part of federal and state regulators to detect and quantify emissions of methane, an important greenhouse gas, from various parts of the oil and gas infrastructure including well pads and pipelines. Pressure and/or flow anomalies are typically used to detect leaks along natural gas pipelines, but are generally very insensitive and subject to false alarms. We have developed a system to detect and localize methane leaks along gas pipelines that is an order of magnitude more sensitive by combining tunable diode laser spectroscopy (TDLAS) with conventional sensor tube technology. This technique can potentially localize leaks along pipelines up to 100 km lengths with an accuracy of +/-50 m or less. A sensor tube buried along the pipeline with a gas-permeable membrane collects leaking gas during a soak period. The leak plume within the tube is then carried to the nearest sensor node along the tube in a purge cycle. The time-to-detection is used to determine leak location. Multiple sensor nodes are situated along the pipeline to minimize the time to detection, and each node is composed of a short segment of hollow core fiber (HCF) into which leaking gas is transported quickly through a small pressure differential. The HCF sensing node is spliced to standard telecom solid core fiber which transports the laser light for spectroscopy to a remote interrogator. The interrogator is multiplexed across the sensor nodes to minimize equipment cost and complexity.

  9. Pipelined multiprocessor system-on-chip for multimedia

    CERN Document Server

    Javaid, Haris

    2014-01-01

    This book describes analytical models and estimation methods to enhance performance estimation of pipelined multiprocessor systems-on-chip (MPSoCs).  A framework is introduced for both design-time and run-time optimizations. For design space exploration, several algorithms are presented to minimize the area footprint of a pipelined MPSoC under a latency or a throughput constraint.  A novel adaptive pipelined MPSoC architecture is described, where idle processors are transitioned into low-power states at run-time to reduce energy consumption. Multi-mode pipelined MPSoCs are introduced, where multiple pipelined MPSoCs optimized separately are merged into a single pipelined MPSoC, enabling further reduction of the area footprint by sharing the processors and communication buffers. Readers will benefit from the authors’ combined use of analytical models, estimation methods and exploration algorithms and will be enabled to explore billions of design points in a few minutes.   ·         Describes the ...

  10. Pipeline coating inspection in Mexico applying surface electromagnetic technology

    Energy Technology Data Exchange (ETDEWEB)

    Delgado, O.; Mousatov, A.; Nakamura, E.; Villarreal, J.M. [Instituto Mexicano del Petroleo (IMP), Mexico City (Mexico); Shevnin, V. [Moscow State University (Russian Federation); Cano, B. [Petroleos Mexicanos (PEMEX), Mexico City (Mexico)

    2009-07-01

    The main problems in the pipeline systems in Mexico include: extremely aggressive soil characterized by a high clay content and low resistivity, interconnection between several pipes, including electrical contacts of active pipelines with out of service pipes, and short distances between pipes in comparison with their depths which reduce the resolution of coating inspection. The results presented in this work show the efficiency of the Surface Electromagnetic Pipeline Inspection (SEMPI) technology to determine the technical condition of pipelines in situations before mentioned. The SEMPI technology includes two stages: regional and detailed measurements. The regional stage consists of magnetic field measurements along the pipeline using large distances (10 - 100 m) between observation points to delimit zones with damaged coating. For quantitative assessing the leakage and coating resistances along pipeline, additional measurements of voltage and soil resistivity measurements are performed. The second stage includes detailed measurements of the electric field on the pipe intervals with anomalous technical conditions identified in the regional stage. Based on the distribution of the coating electric resistance and the subsoil resistivity values, the delimitation of the zones with different grade of coating quality and soil aggressiveness are performed. (author)

  11. Inspection of the Sloka Branch pipeline. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    By agreement between Latvijas gaze and DONG (the Danish State Gas Company) the Sloka branch on the main gas pipeline Riga-Liepaja was selected for inspection. This pipeline is 30.5 km long and was constructed in 1966/67. The objective of the project has been, based on detailed inspection of relative short lengths of pipe, to determine the integrity of the pipeline and to give advice concerning the continued use as a high pressure transmission pipeline. A further objective has been to provide Latvijas gaze with a package of modern cathodic protection measuring instruments and the necessary know-how for using the instruments. The objectives have been met as follows: Based on a document review together with measurements and observations in the field and in the laboratory, the condition of approximately 10 km of pipeline has been evaluated; Recommendations are given in this report with the aim of extending the life of the pipeline; A cathodic protection instrument package was delivered and a two week training course was arranged in Latvia for Latvijas gaze`s staff covering the use of the instruments. (EG)

  12. Simulation of high consequence areas for gas pipelines

    Directory of Open Access Journals (Sweden)

    Orlando Díaz-Parra

    2018-01-01

    Full Text Available The gas pipeline is used for the transport of natural gas at a great distance. Risks derived from the handling of a combustible material transported under high pressure, by pipelines that pass close to where people live, makes it necessary to adopt prevention, mitigation and control measures to reduce the effect in case of ignition of a gas leak. This work shows the development of a new mathematical model to determine areas of high consequence and their application, using widely available and easy to use software, such as Google Earth and Excel, to determine and visualize the area up to which the level of radiation can affect the integrity of people and buildings. The model takes into account the pressure drop into the gas pipeline from the compression station, the gas leakage rate and possible forms of gas ignition. This development is an alternative to the use of specialized software and highly trained personnel. The simulation is applied to a traced of the Miraflores-Tunja gas pipeline, using a macro developed in Excel to determine the impact area and compare it with the coordinates of the vulnerable areas. The zones where these areas intersect are constituted in high consequence areas and are identified along with the sections of the pipeline that affect them, to provide the operator with a risk analysis tool for the determination and visualization of the gas pipeline and its environment.

  13. A machine learning pipeline for quantitative phenotype prediction from genotype data

    Directory of Open Access Journals (Sweden)

    Jurman Giuseppe

    2010-10-01

    Full Text Available Abstract Background Quantitative phenotypes emerge everywhere in systems biology and biomedicine due to a direct interest for quantitative traits, or to high individual variability that makes hard or impossible to classify samples into distinct categories, often the case with complex common diseases. Machine learning approaches to genotype-phenotype mapping may significantly improve Genome-Wide Association Studies (GWAS results by explicitly focusing on predictivity and optimal feature selection in a multivariate setting. It is however essential that stringent and well documented Data Analysis Protocols (DAP are used to control sources of variability and ensure reproducibility of results. We present a genome-to-phenotype pipeline of machine learning modules for quantitative phenotype prediction. The pipeline can be applied for the direct use of whole-genome information in functional studies. As a realistic example, the problem of fitting complex phenotypic traits in heterogeneous stock mice from single nucleotide polymorphims (SNPs is here considered. Methods The core element in the pipeline is the L1L2 regularization method based on the naïve elastic net. The method gives at the same time a regression model and a dimensionality reduction procedure suitable for correlated features. Model and SNP markers are selected through a DAP originally developed in the MAQC-II collaborative initiative of the U.S. FDA for the identification of clinical biomarkers from microarray data. The L1L2 approach is compared with standard Support Vector Regression (SVR and with Recursive Jump Monte Carlo Markov Chain (MCMC. Algebraic indicators of stability of partial lists are used for model selection; the final panel of markers is obtained by a procedure at the chromosome scale, termed ’saturation’, to recover SNPs in Linkage Disequilibrium with those selected. Results With respect to both MCMC and SVR, comparable accuracies are obtained by the L1L2 pipeline

  14. Comparisons of sediment losses from a newly constructed cross-country natural gas pipeline and an existing in-road pipeline

    Science.gov (United States)

    Pamela J. Edwards; Bridget M. Harrison; Daniel J. Holz; Karl W.J. Williard; Jon E. Schoonover

    2014-01-01

    Sediment loads were measured for about one year from natural gas pipelines in two studies in north central West Virginia. One study involved a 1-year-old pipeline buried within the bed of a 25-year-old skid road, and the other involved a newly constructed cross-country pipeline. Both pipelines were the same diameter and were installed using similar trenching and...

  15. Environmental assessment on karstic formations for implantation of a terrestrial pipeline: case study of the Cacimbas-Catu gas pipeline; Avaliacao ambiental para implantacao de dutos terretres em terrenos carsticos: estudo de caso Gasoduto Cacimbas-Catu

    Energy Technology Data Exchange (ETDEWEB)

    Hurtado, Shanty Navarro; Oliveira, Wilson Jose de; Braun, Oscar [PETROBRAS, Rio de Janeiro, RJ (Brazil)] (and others)

    2008-07-01

    This work concerns in the development of a study on mapping and detection of structures and geological and geotechnical features associated with karstic relief and its implications in terms of ground stability to support the pipeline as well as from the point of view of cavities / caves conservation, potentially impacted by this activity. The limited mobility of track, carried by the existing restrictions, make the route of the Cacimbas-Catu pipeline pass through the cities of Itapebi (BA), Belomonte (BA), Mascote (BA) e Camaca (BA), where the local geology is characterized by rocks of Rio Pardo Group, dating from the Superior proterozoic (lower sequence predominantly carbonatic and upper sequence predominantly terrigenous). The study included a survey of secondary data, a field survey confirming karstic features, a 2D and subsequently 3D tomography survey, and a drilling survey to direct research at points of geo-electrical anomalies. The work did not identify underground cavities on the Cacimbas-Catu pipeline route. Even taking the studies presented geo-electric anomalies the direct investigation did not confirm the presence of voids in sub-surface, which enables the implementation of pipelines in this place, however the presence of electric anomalies with high resistivity indicate geotechnical areas where special care should be taken in relation to the stability of the ground. (author)

  16. Using Geographic Information System - GIS - for pipeline management: case of Urucu-Coari LPG pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Furquim, Maysa P.O. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    This technical paper seeks to demonstrate the stages run during the GIS - Geographic Information System accomplishment as for the follow-up of a pipeline work. The GLPDUTO (LPG Pipeline) Urucu-Coari work shall be the focus of this paper. The main challenges in the compilation of data generated in the work site will be presented, as well the importance for the definition of which data should be relevant, so that the construction company and PETROBRAS could follow up its evolution. The GIS development has been performed since January 2007 and should be finished by the first semester of 2009. The following stages for GIS definition for the work management will be presented: brief history of the project - project conception, purpose, structure implemented and accomplishment expectations; survey data in loco - raw data obtained directly during the carrying out of the work and generated in the project and implantation stage; treated data - data resulting from raw data, but already treated as for the GIS environment; routines developed - specific tools created for the consolidation of the data to be manipulated on GIS in an optimized and functional way; result presented - GIS in its final conception, developed and input with the routines and data regarding the project. (author)

  17. Computational study of wax deposition in pipeline

    Science.gov (United States)

    Duan, Jimiao; Gong, Jing; Liu, Huishu

    2013-07-01

    Wax deposition in subsea pipelines is one of the flow assurance problems for oil and gas production. In contrast to many studies about single phase wax deposition, gas-oil wax deposition studies are very limited. The wax deposition mechanism and model prediction are restricted by many factors such as hydrodynamic and thermal when multiphase flow is involved. Wax deposition modeling becomes complicated under multiphase flowing conditions. wax deposition is depended by the flow pattern. The stratified flow is one of the most common flow patterns in the actual subsea gas-oil flowing conditions. In this work, numerical methods are used to study wax deposition in oil-gas stratified flow through a pipe. Based on the flow analysis about stratified flow, the non-isothermal heat and mass transfer is calculated. The temperature profile of the oil and the concentration profile of wax in oil are obtained. The change of the oil-gas interface i.e. the liquid holdup throughout the pipe must be taken into the heat and mass balance. The valid wax deposition surface must be taken into the wax deposition modeling by establishing function of the liquid holdup and the wetted area by oil. The molecular diffusion is as the deposition mechanism. The increase of the wax fraction in the deposit as a function of time depends on the mass flux from the oil deposit interface into the gel and the growth of the deposit thickness depends on the difference between the mass flux from the bulk oil to the oil deposit interface and the mass flux from the interface into the deposit. In addition, the growth of the wax deposit as a function of time along with the effect oil flow rate, gas flow rate and the inlet temperature are discussed. The presence of gas significantly reduces the severity of wax deposition by altering the heat and mass transfer characteristics.

  18. Improvement of Regulatory Requirements for Ensuring the Quality of Underground Gas Pipelines in Conditions of Corrosion Fatigue

    Directory of Open Access Journals (Sweden)

    Larysa Yuzevych

    2017-09-01

    Full Text Available The article develops recommendations for improvement of normative documents concerning the quality of underground metal pipelines (gas pipelines under conditions of fatigue and the impact of an aggressive environment, taking into account cathodic (electrochemical protection. It is established that the basis of information provision of normative documents is the method which includes the following main criteria: the value of the minimum current density of cathode protection; minimum security potential; maximum protective potential, minimal displacement of protective potential; strength criteria of pipe material; criteria of strength of phase layer between the metal and the coating; the strength of the metal in the defect of the insulation coating. It has been found out that the system "metal pipe - insulating dielectric coating" is characterized by such basic procedures as: identification of hazards; various variants of load asymmetry; evaluation of the boundary and optimal values of potentials and currents for the system of cathodic protection of the pipeline. The prospect of further research in this area is determination of the complex indicator of quality and reliability of the linear part of underground main gas pipelines on the basis of research results (submitted information support.

  19. Management of health in the construction and assembly of land pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Richa, Newton M.M.; Ruella, Nildemar C. [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The objectives of this study are: describe the main aspects of a health management experience in a work of construction and assembly of land pipeline, highlighting the positive impacts on safety and productivity; demonstrate that the general objective of the health function is to provide technical support to companies, information and services for leaders, managers, supervisors, workers and families in the management of multiple interfaces of health, especially the health-work interface; and demonstrate that the appropriate management of health may contribute significantly to the overall management of undertakings. (author)

  20. A color image processing pipeline for digital microscope

    Science.gov (United States)

    Liu, Yan; Liu, Peng; Zhuang, Zhefeng; Chen, Enguo; Yu, Feihong

    2012-10-01

    Digital microscope has found wide application in the field of biology, medicine et al. A digital microscope differs from traditional optical microscope in that there is no need to observe the sample through an eyepiece directly, because the optical image is projected directly on the CCD/CMOS camera. However, because of the imaging difference between human eye and sensor, color image processing pipeline is needed for the digital microscope electronic eyepiece to get obtain fine image. The color image pipeline for digital microscope, including the procedures that convert the RAW image data captured by sensor into real color image, is of great concern to the quality of microscopic image. The color pipeline for digital microscope is different from digital still cameras and video cameras because of the specific requirements of microscopic image, which should have the characters of high dynamic range, keeping the same color with the objects observed and a variety of image post-processing. In this paper, a new color image processing pipeline is proposed to satisfy the requirements of digital microscope image. The algorithm of each step in the color image processing pipeline is designed and optimized with the purpose of getting high quality image and accommodating diverse user preferences. With the proposed pipeline implemented on the digital microscope platform, the output color images meet the various analysis requirements of images in the medicine and biology fields very well. The major steps of color imaging pipeline proposed include: black level adjustment, defect pixels removing, noise reduction, linearization, white balance, RGB color correction, tone scale correction and gamma correction.

  1. Update on the SDSS-III MARVELS data pipeline development

    Science.gov (United States)

    Li, Rui; Ge, J.; Thomas, N. B.; Petersen, E.; Wang, J.; Ma, B.; Sithajan, S.; Shi, J.; Ouyang, Y.; Chen, Y.

    2014-01-01

    MARVELS (Multi-object APO Radial Velocity Exoplanet Large-area Survey), as one of the four surveys in the SDSS-III program, has monitored over 3,300 stars during 2008-2012, with each being visited an average of 26 times over a 2-year window. Although the early data pipeline was able to detect over 20 brown dwarf candidates and several hundreds of binaries, no giant planet candidates have been reliably identified due to its large systematic errors. Learning from past data pipeline lessons, we re-designed the entire pipeline to handle various types of systematic effects caused by the instrument (such as trace, slant, distortion, drifts and dispersion) and observation condition changes (such as illumination profile and continuum). We also introduced several advanced methods to precisely extract the RV signals. To date, we have achieved a long term RMS RV measurement error of 14 m/s for HIP-14810 (one of our reference stars) after removal of the known planet signal based on previous HIRES RV measurement. This new 1-D data pipeline has been used to robustly identify four giant planet candidates within the small fraction of the survey data that has been processed (Thomas et al. this meeting). The team is currently working hard to optimize the pipeline, especially the 2-D interference-fringe RV extraction, where early results show a 1.5 times improvement over the 1-D data pipeline. We are quickly approaching the survey baseline performance requirement of 10-35 m/s RMS for 8-12 solar type stars. With this fine-tuned pipeline and the soon to be processed plates of data, we expect to discover many more giant planet candidates and make a large statistical impact to the exoplanet study.

  2. Pressure Prediction of Coal Slurry Transportation Pipeline Based on Particle Swarm Optimization Kernel Function Extreme Learning Machine

    Directory of Open Access Journals (Sweden)

    Xue-cun Yang

    2015-01-01

    Full Text Available For coal slurry pipeline blockage prediction problem, through the analysis of actual scene, it is determined that the pressure prediction from each measuring point is the premise of pipeline blockage prediction. Kernel function of support vector machine is introduced into extreme learning machine, the parameters are optimized by particle swarm algorithm, and blockage prediction method based on particle swarm optimization kernel function extreme learning machine (PSOKELM is put forward. The actual test data from HuangLing coal gangue power plant are used for simulation experiments and compared with support vector machine prediction model optimized by particle swarm algorithm (PSOSVM and kernel function extreme learning machine prediction model (KELM. The results prove that mean square error (MSE for the prediction model based on PSOKELM is 0.0038 and the correlation coefficient is 0.9955, which is superior to prediction model based on PSOSVM in speed and accuracy and superior to KELM prediction model in accuracy.

  3. What role can the rural pipeline play in the recruitment and retention of rural allied health professionals?

    Science.gov (United States)

    Durey, Angela; Haigh, Margaret; Katzenellenbogen, Judith M

    2015-01-01

    People living in rural areas have poorer health than their urban counterparts with higher morbidity and mortality rates and lower life expectancy. Challenges attracting health professionals to work in rural locations in Australia and elsewhere have been well- documented. In response, the idea of a rural pipeline emerged in the medical literature as a career pathway for doctors, conceptualised as a career continuum starting at school and ending in a committed, appropriately trained and supported rural doctor. This article draws on the literature to consider how the concept of a rural pipeline can be used to enhance recruitment and retention of allied health professionals (AHPs) in Australia. The complexity of the issue is taken into account, acknowledging the diverse professional, organisational and social needs within and between AHPs and their different career pathways. With this in mind, the rural pipeline is adapted and extended to focus on AHPs who enter at any stage of their career to work in rural areas. Barriers to recruitment and retention require multifaceted strategies to encourage and support AHPs at various stages along the pipeline to enter, and remain in, rural practice. Findings from the literature identify discrete themes within and between AHPs about factors influencing their rural recruitment and retention choices and include career stage at entry to rural practice, age, gender, social context, professional support, organisational environment and public-private practice mix in service delivery. These findings underscored the development of an extended rural pipeline adapted to specifically target AHPs. This flexible framework of entry to rural practice can be applied at any stage of their career and includes suggestions of strategies to support retention. Evidence from studies of rural AHPs suggests a flexible approach to recruitment and retention is needed that takes into account the complexity of the issue. The extended rural pipeline adapted to

  4. Alaska-Canada Pipeline Project : getting it done

    Energy Technology Data Exchange (ETDEWEB)

    Brintnell, R. [Enbridge Pipelines Inc., Calgary, AB (Canada)

    2005-07-01

    Enbridge's unique qualifications for the proposed Alaska-Canada pipeline that will extend from Prudhoe Bay, Alaska to Fort Saskatchewan, Alberta was discussed. Enbridge is Canada's largest local distribution company (LDC), handling approximately 14 bcf of natural gas per day through pipeline, processing and marketing. It also operates the world's longest liquids pipeline, delivering more than 2 million barrels per day. The company also has 20 years of operational experience in perma frost regions. The key challenges facing the construction of the proposed new high pressure liquids rich pipeline were discussed with reference to market outlook; cost reduction; U.S. fiscal and regulatory issues; Alaska fiscal contract; and, Canadian regulatory efficiency. A successful project will mean a $15 billion capital expenditure in Canada, $16 billion in government revenues, 12,000 construction work years, and tens of thousands of new jobs. It will also improve Alberta's position as the key energy hub and will increase the utilization of the existing infrastructure. Canadian consumers will benefit from access to a new supply basin and a more secure source of clean-burning natural gas at a cost competitive price. In order to get the project completed, the following requirements must be met: regulatory regimes must be clear and predictable; land access must be ensured in a timely manner; access to skilled human resources, material and equipment must also be ensured to facilitate timely and efficient project implementation; and, the safe and environmentally sound operation of the pipelines must also be ensured. This paper highlighted Canadian regulatory options in terms of the National Energy Board Act, Canadian Environmental Assessment Act, the Yukon Environmental and Socio-Economic Assessment Act, and the Northern Pipeline Act. Enbridge's proposed straddle plant at Fort Saskatchewan was discussed along with inter-connecting pipeline options. Enbridge

  5. REMOTE DETECTION OF INTERNAL PIPELINE CORROSION USING FLUIDIZED SENSORS

    Energy Technology Data Exchange (ETDEWEB)

    Narasi Sridhar; Garth Tormoen; Ashok Sabata

    2005-10-31

    Pipelines present a unique challenge to monitoring because of the great geographical distances they cover, their burial depth, their age, and the need to keep the product flowing without much interruption. Most other engineering structures that require monitoring do not pose such combined challenges. In this regard, a pipeline system can be considered analogous to the blood vessels in the human body. The human body has an extensive ''pipeline'' through which blood and other fluids are transported. The brain can generally sense damage to the system at any location and alert the body to provide temporary repair, unless the damage is severe. This is accomplished through a vast network of fixed and floating sensors combined with a vast and extremely complex communication/decision making system. The project described in this report mimics the distributed sensor system of our body, albeit in a much more rudimentary fashion. Internal corrosion is an important factor in pipeline integrity management. At present, the methods to assess internal corrosion in pipelines all have certain limitations. In-line inspection tools are costly and cannot be used in all pipelines. Because there is a significant time interval between inspections, any impact due to upsets in pipeline operations can be missed. Internal Corrosion Direct Assessment (ICDA) is a procedure that can be used to identify locations of possible internal corrosion. However, the uncertainties in the procedure require excavation and location of damage using more detailed inspection tools. Non-intrusive monitoring techniques can be used to monitor internal corrosion, but these tools also require pipeline excavation and are limited in the spatial extent of corrosion they can examine. Therefore, a floating sensor system that can deposit at locations of water accumulation and communicate the corrosion information to an external location is needed. To accomplish this, the project is divided into four main

  6. Bicycle: a bioinformatics pipeline to analyze bisulfite sequencing data.

    Science.gov (United States)

    Graña, Osvaldo; López-Fernández, Hugo; Fdez-Riverola, Florentino; González Pisano, David; Glez-Peña, Daniel

    2018-04-15

    High-throughput sequencing of bisulfite-converted DNA is a technique used to measure DNA methylation levels. Although a considerable number of computational pipelines have been developed to analyze such data, none of them tackles all the peculiarities of the analysis together, revealing limitations that can force the user to manually perform additional steps needed for a complete processing of the data. This article presents bicycle, an integrated, flexible analysis pipeline for bisulfite sequencing data. Bicycle analyzes whole genome bisulfite sequencing data, targeted bisulfite sequencing data and hydroxymethylation data. To show how bicycle overtakes other available pipelines, we compared them on a defined number of features that are summarized in a table. We also tested bicycle with both simulated and real datasets, to show its level of performance, and compared it to different state-of-the-art methylation analysis pipelines. Bicycle is publicly available under GNU LGPL v3.0 license at http://www.sing-group.org/bicycle. Users can also download a customized Ubuntu LiveCD including bicycle and other bisulfite sequencing data pipelines compared here. In addition, a docker image with bicycle and its dependencies, which allows a straightforward use of bicycle in any platform (e.g. Linux, OS X or Windows), is also available. ograna@cnio.es or dgpena@uvigo.es. Supplementary data are available at Bioinformatics online.

  7. Grasping at Straws: Comments on the Alberta Pipeline Safety Review

    Directory of Open Access Journals (Sweden)

    Jennifer Winter

    2013-09-01

    Full Text Available The release last month of the Alberta Pipeline Safety Review was meant to be a symbol of the province’s renewed commitment to environmental responsibility as it aims for new export markets. The report’s authors, Group 10 Engineering, submitted 17 recommendations covering public safety and pipeline incidents, pipeline integrity management and pipeline safety near bodies of water — and many of them run the gamut from the obvious to the unhelpful to the contradictory. That the energy regulator ought to be staffed to do its job should go without saying; in fact, staffing levels were never identified as an issue. The recommendation that record retention and transfer requirements be defined for mergers and acquisitions, sales and takeovers is moot. There is no reason a purchasing party would not want all relevant documents, and no real way to enforce transparency if the seller opts to withhold information. Harmonizing regulations between provinces could reduce companies’ cost of doing business, but could also prove challenging if different jurisdictions use performance-based regulations — which is what the Review recommended Alberta consider. This very brief paper pries apart the Review’s flaws and recommends that the province go back to the drawing board. Safety is a serious issue; a genuine statistical review linking pipeline characteristics to failures and risk-mitigation activities would be a better alternative by far.

  8. USING COMPUTER MODELS FOR DESIGN OF COMPLEX PIPELINE SYSTEMS

    Directory of Open Access Journals (Sweden)

    S. V. Kolesnikov

    2014-01-01

    Full Text Available The main rules of computer models construction were developed, which intended for pipeline networks design and they were considered as single whole hydraulic systems. The construction of new sections is possible after their design in order to provide operation in given regime. In heat networks operation we see the following problems: irregular change in pressure between direct and return pipelines, increased pressure in return pipeline, misalignment of network and others. Their causes may be: undersize thickness of pipelines, reduction in diameter caused by scales in internal surfaces of pipes, closure of gate valves in sections of networks with big speeds of heat coolant, “parasitic” circulations and others. Efficient mean for determining the main reasons of these problems, they may be in any heat pipeline, and also for new heating pipe networks design we consider computer models, which allow to simulate (practically in the whole volume hydraulic and temperature regimes of their work.  The purpose of work – using computer models for implementation of project of new heat removal pipe from Tolyatti central thermal station in order to heat the Central Region of Tolyatti, feeding from heat power station of the Volga car factory .With the help of developed computer model the location of equipment and their main characteristics were determined, they take into account joint work of two sources of heat (central thermal station of Tolyatti and the Volga car factory. 

  9. FUZZY INFERENCE BASED LEAK ESTIMATION IN WATER PIPELINES SYSTEM

    Directory of Open Access Journals (Sweden)

    N. Lavanya

    2015-01-01

    Full Text Available Pipeline networks are the most widely used mode for transporting fluids and gases around the world. Leakage in this pipeline causes harmful effects when the flowing fluid/gas is hazardous. Hence the detection of leak becomes essential to avoid/minimize such undesirable effects. This paper presents the leak detection by spectral analysis methods in a laboratory pipeline system. Transient in the pressure signal in the pipeline is created by opening and closing the exit valve. These pressure variations are captured and power spectrum is obtained by using Fast Fourier Transform (FFT method and Filter Diagonalization Method (FDM. The leaks at various positions are simulated and located using these methods and the results are compared. In order to determine the quantity of leak a 2 × 1 fuzzy inference system is created using the upstream and downstream pressure as input and the leak size as the output. Thus a complete leak detection, localization and quantification are done by using only the pressure variations in the pipeline.

  10. Analytical solution and numerical study on water hammer in a pipeline closed with an elastically attached valve

    Science.gov (United States)

    Henclik, Sławomir

    2018-03-01

    The influence of dynamic fluid-structure interaction (FSI) onto the course of water hammer (WH) can be significant in non-rigid pipeline systems. The essence of this effect is the dynamic transfer of liquid energy to the pipeline structure and back, which is important for elastic structures and can be negligible for rigid ones. In the paper a special model of such behavior is analyzed. A straight pipeline with a steady flow, fixed to the floor with several rigid supports is assumed. The transient is generated by a quickly closed valve installed at the end of the pipeline. FSI effects are assumed to be present mainly at the valve which is fixed with a spring dash-pot attachment. Analysis of WH runs, especially transient pressure changes, for various stiffness and damping parameters of the spring dash-pot valve attachment is presented in the paper. The solutions are found analytically and numerically. Numerical results have been computed with the use of an own computer program developed on the basis of the four equation model of WH-FSI and the specific boundary conditions formulated at the valve. Analytical solutions have been found with the separation of variables method for slightly simplified assumptions. Damping at the dash-pot is taken into account within the numerical study. The influence of valve attachment parameters onto the WH courses was discovered and it was found the transient amplitudes can be reduced. Such a system, elastically attached shut-off valve in a pipeline or other, equivalent design can be a real solution applicable in practice.

  11. Corrosion and coating defects on buried pipelines under CP: Excavations data collection and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Karcher, Sebastien; Campaignolle, Xavier; Masson, Bernard; Meyer, Michel [Gaz de France Research and Development Division, 361 avenue du President Wilson, BP33 93211 Saint Denis La Plaine (France)

    2004-07-01

    the surrounding ground and environment at the time of excavation, as well as a documentation of the metal damage, if any. Data analysis as well as statistics can then be applied to process these data. For instance, standard data treatment methods allow the compilation, on sub sets of pipelines with identical coating type, of the distribution of the number of coating defects and/or corrosion with respect to the pipeline age. It can also be attempted to relate those distributions with ground type or other relevant parameters, and to compare these distributions with regards to the coating type. Eventually, the studies may, for example, reveal any correlation between the type/size of coating defects (disbandment, lack of coating, etc.), and the presence (or lack) of a corrosion fault, and help to analyze the significance of such correlation. Later on, more sophisticated statistics, together with input from fundamental knowledge and expert judgment, may help to pin out the risk factors leading to corrosion. This paper will focus on the benefits of properly capitalizing field data collection and analyzing field data to better understand root causes of degradation of the (coating + CP) system protective efficiency. Ultimately, it is intended to show how such activities may support integrity and safety management of the whole transmission pipeline network. (authors)

  12. An milp formulation for the scheduling of multiproduct pipeline systems

    Directory of Open Access Journals (Sweden)

    Rejowski Jr. R.

    2002-01-01

    Full Text Available Pipelines provide an economic mode of fluid transportation for petroleum systems, specially when large amounts of these products have to be pumped for large distances. The system discussed in this paper is composed of a petroleum refinery, a multiproduct pipeline connected to several depots and the corresponding consumer markets that receive large amounts of gasoline, diesel, LPG and aviation fuel. An MILP optimization model that is based on a convex-hull formulation is proposed for the scheduling system. The model must satisfy all the operational constraints, such as mass balances, distribution constraints and product demands. Results generated include the inventory levels at all locations, the distribution of products between the depots and the best ordering of products in the pipeline.

  13. RF sensor for multiphase flow measurement through an oil pipeline

    Science.gov (United States)

    Wylie, S. R.; Shaw, A.; Al-Shamma'a, A. I.

    2006-08-01

    We have developed, in conjunction with Solartron ISA, an electromagnetic cavity resonator based sensor for multiphase flow measurement through an oil pipeline. This sensor is non-intrusive and transmits low power (10 mW) radio frequencies (RF) in the range of 100-350 MHz and detects the pipeline contents using resonant peaks captured instantaneously. The multiple resonances from each captured RF spectrum are analysed to determine the phase fractions in the pipeline. An industrial version of the sensor for a 102 mm (4 inch) diameter pipe has been constructed and results from this sensor are compared to those given by simulations performed using the electromagnetic high frequency structure simulator software package HFSS. This paper was presented at the 13th International Conference on Sensors and held in Chatham, Kent, on 6-7 September 2005.

  14. MIC in long oil pipelines: diagnosis, treatment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Jenneman, Gary; Harris, Jennifer; Webb, Robert [ConocoPhillips (Canada)

    2011-07-01

    The paper presents the diagnosis, treatment and monitoring of microbial influenced corrosion (MIC) in long oil pipelines. The presence of inorganic solids, bacteria, gases and organic acids in produced water in the oil pipelines causes MIC, which is hard to detect or test and it does not produce any unique type of corrosion. Chemical analysis of water from pig runs is presented in a tabular form and a graphical analysis of pig sludge solids is shown. From the biometabolite analysis, 23 putative hydrocarbon biometabolites were identified and biometabolites for the anaerobic biodegradation of aromatic HC were also detected. Operational considerations include the history of MIC in upstream pipelines, water slugging, and presence of suspended solids, among others. From microbiological, chemical, metallurgical and operational evidence it was suggested that MIC is a likely mechanism. The mitigation program is described and suggestions for successful mitigation measures include removal of oxygen sources, scale inhibitor injection, and increasing CO2 inhibitor concentration.

  15. Microbiologically influenced corrosion in petroleum product pipelines--a review.

    Science.gov (United States)

    Muthukumar, N; Rajasekar, A; Ponmariappan, S; Mohanan, S; Maruthamuthu, S; Muralidharan, S; Subramanian, P; Palaniswamy, N; Raghavan, M

    2003-09-01

    Microbiologically influenced corrosion is responsible for most of the internal corrosion problems in oil transportation pipelines and storage tanks. One problematic area in treating gas lines is the occurrence of the stratification of water in the line. Under these conditions, corrosion inhibitors do not come into contact properly and oil and inhibitors undergo degradation. The role of bacteria on oil degradation, the consequences of oil degradation in fuel systems and its influence on corrosion have been explained in detail. Besides, factors influencing on degradation of oil and corrosion inhibitors have also been discussed. Mechanism of microbiologically influenced corrosion in oil pipeline has been explained. Many of the misapplication of biocides/inhibitors occur mainly because the characteristics of biocides/inhibitors are not considered before use in pipeline industry. List of biocides and monitoring programme have been collected from literature and presented.

  16. Detection of underground pipeline based on Golay waveform design

    Science.gov (United States)

    Dai, Jingjing; Xu, Dazhuan

    2017-08-01

    The detection of underground pipeline is an important problem in the development of the city, but the research about it is not mature at present. In this paper, based on the principle of waveform design in wireless communication, we design an acoustic signal detection system to detect the location of underground pipelines. According to the principle of acoustic localization, we chose DSP-F28335 as the development board, and use DA and AD module as the master control chip. The DA module uses complementary Golay sequence as emission signal. The AD module acquisiting data synchronously, so that the echo signals which containing position information of the target is recovered through the signal processing. The test result shows that the method in this paper can not only calculate the sound velocity of the soil, but also can locate the location of underground pipelines accurately.

  17. Caspian Pipeline Consortium, Bellwether of Russia's Investment climate?

    International Nuclear Information System (INIS)

    Dellecker, A.

    2008-01-01

    The Caspian Pipeline Consortium (CPC), a shipper-owned oil pipeline carrying Caspian oil to Russia's Black Sea port of Novorossyisk, remains to this day the only oil export pipeline on Russian territory that is not under the control of the state company Transneft. Completed in 2001, the CPC was, from the start, the product of a fragile balance of power between states eager to maintain control of hydrocarbon flows and private companies able to finance the necessary infrastructure. Despite its economic success, the future of the CPC currently hinges on a share-holding dispute pitting Russia against private shareholders. This essay places the CPC dossier in the broader context of Russia's investment climate and argues that the dispute's dynamic is an important bellwether of the Russian energy policy. (author)

  18. Pipeline monitoring with interferometry in non-arid regions

    Energy Technology Data Exchange (ETDEWEB)

    McCardle, Adrian; Rabus, Bernhard; Ghuman, Parwant [MacDonald Dettwiler, Richmond, BC (Canada); Freymueller, Jeff T. [University of Alaska, Fairbanks (United States)

    2005-07-01

    Interferometry has become a proven technique for accurately measuring ground movements caused by subsidence, landslides, earthquakes and volcanoes. Using space borne sensors such as the ERS, ENVISAT and RADARSAT satellites, ground deformation can be monitored on a millimeter level. Traditionally interferometry has been limited to arid areas however new technology has allowed for successful monitoring in vegetated regions and areas of changing land-cover. Analysis of ground movement of the Trans-Alaskan pipeline demonstrates how these techniques can offer pipeline engineers a new tool for observing potential dangers to pipeline integrity. Results from Interferometric Point Target Analysis were compared with GPS measurements and speckle tracking interferometry was demonstrated to measure a major earthquake. (author)

  19. Method of cleaning pipeline in control rod drive

    International Nuclear Information System (INIS)

    Baba, Mikiya.

    1993-01-01

    A step of filtering cleaning water by a provisional filter unit and a step of returning filtered cleaning water to a provisional tank are disposed. That is, purified water is stored in the provisional tank and it is sucked by a driving pump under pressure by way of a suction filter into the pipelines in a control rod drive system to clean them. Purified water after the cleaning is filtered by the provisional filter unit and returned to the provisional tank by way of provisional pipelines to form a closed loop. A great amount of purified water to be used is no more necessary by thus changing the water passing cleaning method to the recycling cleaning method, which moderate influences on other steps using purified water and ensure a cleaning step for pipelines in a CRD system, in addition, save the steps for plant construction greatly. (N.H.)

  20. Environmental hazards for pipelines in coastal regions/shore approaches

    International Nuclear Information System (INIS)

    Jinsi, B.K.

    1995-01-01

    Often oil/gas and other hydrocarbons discovered and produced offshore are transported to onshore facilities via submarine pipelines. The route of such pipelines traverses through coastal/shore approach regions. For a rational/economic design, safe installation and subsequent operation it is of utmost importance to review, evaluate and finalize various environmental hazard such as winds, waves, currents, seabed topography, seabed and sub-bottom soils, seabed erosion and soil accretion. This paper addresses the above described environmental hazards, their assessment and techniques to prepare design parameters which must be used for stability analysis, installation methods, long term operation and maintenance for the shore approaches. Additionally, various proven pipeline installation and stabilization techniques for the shore approach region are detailed. As case histories, three approaches installed in the Dutch North Sea are described

  1. MrBUMP: an automated pipeline for molecular replacement.

    Science.gov (United States)

    Keegan, Ronan M; Winn, Martyn D

    2008-01-01

    A novel automation pipeline for macromolecular structure solution by molecular replacement is described. There is a special emphasis on the discovery and preparation of a large number of search models, all of which can be passed to the core molecular-replacement programs. For routine molecular-replacement problems, the pipeline automates what a crystallographer might do and its value is simply one of convenience. For more difficult cases, the pipeline aims to discover the particular template structure and model edits required to produce a viable search model and may succeed in finding an efficacious combination that would be missed otherwise. An overview of MrBUMP is given and some recent additions to its functionality are highlighted.

  2. Reasons for decision in the matter of Trans Mountain Pipeline Inc. (formerly Terasen Pipelines (Trans Mountain) Inc.) : tariffs

    International Nuclear Information System (INIS)

    2007-01-01

    In 2006 and 2007 Terasen Pipelines (Trans Mountain) Inc. (now Trans Mountain Pipeline Inc.) submitted a series of applications to the National Energy Board for revisions to the Trans Mountain Tariffs. They were filed in response to apportionment concerns on the Trans Mountain pipeline. Four of the applications involved pronounced and contentious changes to the capacity allocation procedures on the pipeline system. For ease of reference, the Board amalgamated its 4 decisions on these applications into a single document. A map of the Trans Mountain pipeline system as a whole was presented along with a detailed map indicating the delivery locations served by the system in the lower mainland of British Columbia and the state of Washington. The issues considered by the Board in each of these decisions included capacity allocation for Westridge Dock; capacity allocations to export destinations; common carriage requirements; and the need for creating a new barge subcategory. Relevant sections of the National Energy Board Act referred to in the decisions were highlighted. This document also listed the Trans Mountain Tariffs that have introduced notable revisions to the capacity allocation procedures on the system since September 2003. 16 refs., 2 figs., 3 appendices

  3. Residual stresses evaluation in a gas-pipeline crossing

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Maria Cindra [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil); Almeida, Manoel Messias [COMPAGAS, Curitiba, PR (Brazil); Rebello, Joao Marcos Alcoforado [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil); Souza Filho, Byron Goncalves de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The X-rays diffraction technique is a well established and effectiveness method in the determination of the residual and applied stresses in fine grained crystalline materials. It allows to characterize and to quantify the magnitude and direction of the existing surface stresses in the studied point of the material. The objective of this work is the evaluation of the surface stresses in a 10 in diameter Natural Gas Distribution Pipeline manufactured from API 5 L Gr B steel of COMPAGAS company, in a crossing with a Natural Gas Transportation Pipeline, in Araucaria-PR. This kind of evaluation is important to establish weather you have to perform a repositioning of one of the pipeline or not. The measurements had been made in two transversal sections of the pipe, the one upstream (170 mm of the external wall of the pipeline) and another one downstream (840 mm of the external wall of the pipeline). Each transversal section measurements where carried out in 3 points: 9 hours, 12 hours and 3 hours. In each measured point of the pipe surface, the longitudinal and transversal stresses had been measured. The magnitude of the surface residual stresses in the pipe varied of +180 MPa at the -210 MPa. The residual stress state on the surface of the points 12 hours region is characterized by tensile stresses and by compressive stresses in the points of 3 and 9 hours region. The surface residual stresses in gas-pipeline have been measured using X-ray diffraction method, by double exposure technique, using a portable apparatus, with Cr-K-alpha radiation. (author)

  4. Saint John lateral pipeline project: comprehensive study report

    International Nuclear Information System (INIS)

    1999-02-01

    A descripion is given of the results of an environmental impact assessment of the construction of a natural gas pipeline that will bring gas from Maritimes and Northeast Pipeline Management Ltd.'s (M and NP) main transmission pipeline to clients in Lake Utopia and Saint John, NB. It will be 110 km long, and the Saint John lateral will join the mainline approximately 2 km south of Big Kedron Lake, NB. Various institutional, industrial, commercial and residential clients will be able to access the pipeline in the future, and it is intended to be capable of future expansion for markets along its route and for markets that become economically feasible in the future. A matrix was developed that relates environmental resources to Environmental Components of Concern (ECCs), and to the rationale for exclusion/inclusion of the ECC as a Valued Environmental Component (VECs). The positive benefits of the pipeline to clients in the Saint John area include: reduced dependence on foreign oil, fuel switching and price competition, lower air emission pollution, increased energy efficiency, and a source of energy that is secure and reliable. VECs were selected based on: concerns of various stakeholders including the public, community groups, scientific parties, Aboriginal groups, government officials and agencies, relevant regulations; relevant literature; and past evaluation experiences, including future developments of the proposed study area. Further selection of the VECs required an examination of the issues picked out via scoping to determine the ways in which the overall project could affect the ECCs, and included construction, operation, decommissioning/abandonment, malfunctions and accidents of the pipeline. The phases of the project as they impacted residually and cumulatively on the VECs were evaluated, and impacts on Valued Socio-Economic Components (VSCs) were assessed also. The mitigation efforts taken will minimize the potential effects of the project on VECs and VSCs

  5. Design, Construction and Demonstration of a Robotic Platform for the Inspection of Unpiggable Pipelines under Live Conditions (#146)

    Science.gov (United States)

    2011-05-01

    The 2002 Office of Pipeline Safety (OPS) regulations requiring the inspection of all transmission pipelines, including those that are now deemed "unpiggable", triggered the search for technologies that would make the inspection of unpiggable pipeline...

  6. 49 CFR 192.937 - What is a continual process of evaluation and assessment to maintain a pipeline's integrity?

    Science.gov (United States)

    2010-10-01

    ... Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE... completing the baseline integrity assessment of a covered segment, an operator must continue to assess the...

  7. Upgrading Algeria-Italy trans-Mediterranean natural gas pipeline

    International Nuclear Information System (INIS)

    Stella, G.

    1992-01-01

    The first trans-Mediterranean pipeline system, which went into service in 1983, had to be doubled in capacity in order to meet increased European demand for Algerian natural gas. After a brief review of the contractual, planning and construction history of the first pipeline, this paper discusses the strategies taken which led to the decision to double the line's capacity. Descriptions are then given of the different construction phases realized in Tunisia, the Sicilian Channel and Italian mainland. Focus is on construction schedules, problems and solutions. The report comes complete with details of project financing, organizing, materials supply programs, innovative technology applications, design philosophy and construction techniques

  8. Simulation of Wave-Plus-Current Scour beneath Submarine Pipelines

    DEFF Research Database (Denmark)

    Eltard-Larsen, Bjarke; Fuhrman, David R.; Sumer, B. Mutlu

    2016-01-01

    A fully coupled hydrodynamic and morphologic numerical model was utilized for the simulation of wave-plus-current scour beneath submarine pipelines. The model was based on incompressible Reynolds-averaged Navier–Stokes equations, coupled with k-ω turbulence closure, with additional bed and suspen......A fully coupled hydrodynamic and morphologic numerical model was utilized for the simulation of wave-plus-current scour beneath submarine pipelines. The model was based on incompressible Reynolds-averaged Navier–Stokes equations, coupled with k-ω turbulence closure, with additional bed...

  9. Pipeline risk management manual ideas, techniques, and resources

    CERN Document Server

    Muhlbauer, W Kent

    2004-01-01

    Here's the ideal tool if you're looking for a flexible, straightforward analysis system for your everyday design and operations decisions. This new third edition includes sections on stations, geographical information systems, ""absolute"" versus ""relative"" risks, and the latest regulatory developments. From design to day-to-day operations and maintenance, this unique volume covers every facet of pipeline risk management, arguably the most important, definitely the most hotly debated, aspect of pipelining today.Now expanded and updated, this widely accepted standard reference guide

  10. The Photometry Pipeline of the Watcher Robotic Telescope

    Directory of Open Access Journals (Sweden)

    A. Ferrero

    2010-01-01

    Full Text Available The Watcher robotic telescope was developed primarily to perform rapid optical follow-up observations of Gamma-Ray Bursts (GRBs. Secondary scientific goals include blazar monitoring and variable star studies. An automated photometry pipeline to rapidly analyse data from Watcher has been implemented. Details of the procedures to get image zero-point, source instrumental measurement, and limiting magnitude are presented. Sources of uncertainty are assessed and the performance of the pipeline is tested by comparison with a number of catalogue sources.

  11. US gas pipelines respond to FERC Order 636

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that U.S. pipelines are continuing to examine the react to the Federal Energy Regulatory Commission's Order 636. Among the latest responses: Bill Vititoe, president and chief executive officer of ANR Pipeline Co., a subsidiary of Coastal Corp., Houston, the his company's recently proposed comprehensive service restructuring and rate settlement basically is consistent with Order 636. Paul M. Anderson, executive vice-president of Panhandle Eastern Corp., Houston, the Order 63 likely will increase reliance on long term gas sales contracts and shrink or eliminate spot market sales

  12. Silicon compiler design of combinational and pipeline adder integrated circuits

    Science.gov (United States)

    Froede, A. O., III

    1985-06-01

    The architecture and structures used by the MacPitts silicon compiler to design integrated circuits are described, and the capabilities and limitations of the compiler are discussed. The performance of several combinational and pipeline adders designed by MacPitts and a hand-crafted pipeline adder are compared. Several different MacPitts design errors are documented. Tutorial material is presented to aid in using the MacPitts interpreter and to illustrate timing analysis of MacPitts-designed circuits using the program Crystal.

  13. Method for Stereo Mapping Based on Objectarx and Pipeline Technology

    Science.gov (United States)

    Liu, F.; Chen, T.; Lin, Z.; Yang, Y.

    2012-07-01

    Stereo mapping is an important way to acquire 4D production. Based on the development of the stereo mapping and the characteristics of ObjectARX and pipeline technology, a new stereo mapping scheme which can realize the interaction between the AutoCAD and digital photogrammetry system is offered by ObjectARX and pipeline technology. An experiment is made in order to make sure the feasibility with the example of the software MAP-AT (Modern Aerial Photogrammetry Automatic Triangulation), the experimental results show that this scheme is feasible and it has very important meaning for the realization of the acquisition and edit integration.

  14. METHOD FOR STEREO MAPPING BASED ON OBJECTARX AND PIPELINE TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    F. Liu

    2012-07-01

    Full Text Available Stereo mapping is an important way to acquire 4D production. Based on the development of the stereo mapping and the characteristics of ObjectARX and pipeline technology, a new stereo mapping scheme which can realize the interaction between the AutoCAD and digital photogrammetry system is offered by ObjectARX and pipeline technology. An experiment is made in order to make sure the feasibility with the example of the software MAP-AT (Modern Aerial Photogrammetry Automatic Triangulation, the experimental results show that this scheme is feasible and it has very important meaning for the realization of the acquisition and edit integration.

  15. Stepping Stones to Research: Providing Pipelines from Middle School through PhD

    Science.gov (United States)

    Noel-Storr, Jacob; Baum, S. A.; RIT Insight Lab SSR Team; Carlson CenterImaging Science Faculty, Chester F.

    2014-01-01

    We present a decade's worth of strategies designed to promote and provide "Stepping Stones to Research" to provide a realistic pipeline of educational opportunities, with multiple gateways and exit points, for students moving towards STEM careers along the "STEM pipeline". We also illustrate how the Stepping Stones are designed to incidentally co-inside with related external opportunities through which we can also guide and support our mentees on their paths. We present programs such as middle school family science programs, high school research opportunities, high school internships, undergraduate research pathways, research experiences for undergraduates, and other opportunities. We will highlight the presentations being made at this very meeting -- from the first presentation of a high school student, to a dissertation presentation of a PhD graduate -- that have benefited from this stepping stone principle. We also reflect on the essential nature of building a "researcher-trust", even as a young student, of advocates and mentors who can support the continuation of a scientific career.

  16. Processing Earth Observing images with Ames Stereo Pipeline

    Science.gov (United States)

    Beyer, R. A.; Moratto, Z. M.; Alexandrov, O.; Fong, T.; Shean, D. E.; Smith, B. E.

    2013-12-01

    ICESat with its GLAS instrument provided valuable elevation measurements of glaciers. The loss of this spacecraft caused a demand for alternative elevation sources. In response to that, we have improved our Ames Stereo Pipeline (ASP) software (version 2.1+) to ingest satellite imagery from Earth satellite sources in addition to its support of planetary missions. This enables the open source community a free method to generate digital elevation models (DEM) from Digital Globe stereo imagery and alternatively other cameras using RPC camera models. Here we present details of the software. ASP is a collection of utilities written in C++ and Python that implement stereogrammetry. It contains utilities to manipulate DEMs, project imagery, create KML image quad-trees, and perform simplistic 3D rendering. However its primary application is the creation of DEMs. This is achieved by matching every pixel between the images of a stereo observation via a hierarchical coarse-to-fine template matching method. Matched pixels between images represent a single feature that is triangulated using each image's camera model. The collection of triangulated features represents a point cloud that is then grid resampled to create a DEM. In order for ASP to match pixels/features between images, it requires a search range defined in pixel units. Total processing time is proportional to the area of the first image being matched multiplied by the area of the search range. An incorrect search range for ASP causes repeated false positive matches at each level of the image pyramid and causes excessive processing times with no valid DEM output. Therefore our system contains automatic methods for deducing what the correct search range should be. In addition, we provide options for reducing the overall search range by applying affine epipolar rectification, homography transform, or by map projecting against a prior existing low resolution DEM. Depending on the size of the images, parallax, and image

  17. Extending the Fermi-LAT Data Processing Pipeline to the Grid

    Science.gov (United States)

    Zimmer, S.; Arrabito, L.; Glanzman, T.; Johnson, T.; Lavalley, C.; Tsaregorodtsev, A.

    2012-12-01

    The Data Handling Pipeline (“Pipeline”) has been developed for the Fermi Gamma-Ray Space Telescope (Fermi) Large Area Telescope (LAT) which launched in June 2008. Since then it has been in use to completely automate the production of data quality monitoring quantities, reconstruction and routine analysis of all data received from the satellite and to deliver science products to the collaboration and the Fermi Science Support Center. Aside from the reconstruction of raw data from the satellite (Level 1), data reprocessing and various event-level analyses are also reasonably heavy loads on the pipeline and computing resources. These other loads, unlike Level 1, can run continuously for weeks or months at a time. In addition it receives heavy use in performing production Monte Carlo tasks. In daily use it receives a new data download every 3 hours and launches about 2000 jobs to process each download, typically completing the processing of the data before the next download arrives. The need for manual intervention has been reduced to less than 0.01% of submitted jobs. The Pipeline software is written almost entirely in Java and comprises several modules. The software comprises web-services that allow online monitoring and provides charts summarizing work flow aspects and performance information. The server supports communication with several batch systems such as LSF and BQS and recently also Sun Grid Engine and Condor. This is accomplished through dedicated job control services that for Fermi are running at SLAC and the other computing site involved in this large scale framework, the Lyon computing center of IN2P3. While being different in the logic of a task, we evaluate a separate interface to the Dirac system in order to communicate with EGI sites to utilize Grid resources, using dedicated Grid optimized systems rather than developing our own. More recently the Pipeline and its associated data catalog have been generalized for use by other experiments, and are

  18. Video Mosaicking for Inspection of Gas Pipelines

    Science.gov (United States)

    Magruder, Darby; Chien, Chiun-Hong

    2005-01-01

    A vision system that includes a specially designed video camera and an image-data-processing computer is under development as a prototype of robotic systems for visual inspection of the interior surfaces of pipes and especially of gas pipelines. The system is capable of providing both forward views and mosaicked radial views that can be displayed in real time or after inspection. To avoid the complexities associated with moving parts and to provide simultaneous forward and radial views, the video camera is equipped with a wide-angle (>165 ) fish-eye lens aimed along the axis of a pipe to be inspected. Nine white-light-emitting diodes (LEDs) placed just outside the field of view of the lens (see Figure 1) provide ample diffuse illumination for a high-contrast image of the interior pipe wall. The video camera contains a 2/3-in. (1.7-cm) charge-coupled-device (CCD) photodetector array and functions according to the National Television Standards Committee (NTSC) standard. The video output of the camera is sent to an off-the-shelf video capture board (frame grabber) by use of a peripheral component interconnect (PCI) interface in the computer, which is of the 400-MHz, Pentium II (or equivalent) class. Prior video-mosaicking techniques are applicable to narrow-field-of-view (low-distortion) images of evenly illuminated, relatively flat surfaces viewed along approximately perpendicular lines by cameras that do not rotate and that move approximately parallel to the viewed surfaces. One such technique for real-time creation of mosaic images of the ocean floor involves the use of visual correspondences based on area correlation, during both the acquisition of separate images of adjacent areas and the consolidation (equivalently, integration) of the separate images into a mosaic image, in order to insure that there are no gaps in the mosaic image. The data-processing technique used for mosaicking in the present system also involves area correlation, but with several notable

  19. 75 FR 38802 - DCP Raptor Pipeline, LLC; Notice of Baseline Filing

    Science.gov (United States)

    2010-07-06

    ...] DCP Raptor Pipeline, LLC; Notice of Baseline Filing June 28, 2010. Take notice that on June 22, 2010, DCP Raptor Pipeline, LLC submitted a baseline filing of its Statement of Operating Conditions for...

  20. Hybrid Laser/GMAW of High Strength Steel Gas Transmission Pipelines

    Science.gov (United States)

    2008-07-01

    Pipelines will be an integral part of our energy distribution systems for the foreseeable future. Operators are currently considering the installation of tens of billions of dollars of pipeline infrastructure. In a number of cases, the cost of export...

  1. New In-Field Composite Repair Techniques for Transmission or Distribution Pipelines

    Science.gov (United States)

    2009-05-18

    In-field repair of a damaged pipeline must be performed safely, efficiently, rapidly and reliably. Reinforcement of damaged pipelines is typically accomplished by welding a repair patch and then recoating the repaired area. The welded full-encircleme...

  2. Research on the Numerical Simulation of Sleeper in the Pipeline Global Buckling Controlling Practice

    Directory of Open Access Journals (Sweden)

    Liu Wen-Bin

    2017-01-01

    Full Text Available This paper analyzed the lateral buckling of pipelines located in Western Africa with ABAQUS software. The application of sleepers in practice is explored to guide the pipeline buckling controlling design.

  3. Automated Laser Ultrasonic Testing (ALUT) of Hybrid Arc Welds for Pipeline Construction, #272

    Science.gov (United States)

    2009-12-22

    One challenge in developing new gas reserves is the high cost of pipeline construction. Welding costs are a major component of overall construction costs. Industry continues to seek advanced pipeline welding technologies to improve productivity and s...

  4. 49 CFR 195.1 - Which pipelines are covered by this part?

    Science.gov (United States)

    2010-10-01

    ..., rail, or vessel terminal facilities, if the pipeline is less than one mile long (measured outside...; (7) A pipeline segment upstream (generally seaward) of the last valve on the last production facility...

  5. Environmental impact of oil transportation by tankers, pipelines, railway

    International Nuclear Information System (INIS)

    Tsitskishvili, M.S.; Chelidze, M.A.; Kaviladze, I.; Chkhartishvili, A.G.; Tsitskishvili, L.B.; Ninua, T.L.; Kordzaxia, G.I.; Gavasheli, L.; Petriashvili, E.T.; Alania, M.L.; Gigolashvili, Sh.Z.; Kordzakhia, M.O.; Chankotadze, P.

    2005-01-01

    Full text : Considering all types of risks (technical, operational, natural hazards (e.g. geo-hazards) and third party intrusion), the underground pipelines constructed in accordance with the international standards are the most safe and reliable system for oil transportation. Statistical data provided by CONCAWE and US Department of Transportation confirms that the pipeline related spills are rare and mainly related to the old pipelines. Georgia's experience yet confirms the general sound guess that the situation in our countries is not the same as in western Europe or USA and accordingly the CONCAWE statistical data can not be applied mechanically. Two spills (although small and manageable), during the recent 4 years and some discovered illegal hot-taps on the Baku-Supsa pipeline indicate that the issue of third party intrusion risks is much higher in the region and well organized security system is required to protect the pipeline from intentional damage. Of course the pipeline system can not function isolated and it is integrated with the other systems of oil transportation, mainly with off-shore terminals and tankers. The most significant of the recorded pollution damages are related to the tanker collisions (like Prestige and Exxon Valdez cases). The basic fact, which we would like to stress, is that the environmental risks related to the tanker collisions are much higher for such confined or semi-confined systems as Black and Caspian seas. The overloading of the Black Sea transportation capacity and especially its limiting narrow point - the Bosporus will inevitably lead in future to the implementation of the restrictive measures limiting transportation of oil by tankers in the Black Sea. Therefore, the role of the BTC pipeline as major transportation system will increase significantly. We consider that responsibility of the scientific society is to facilitate this process as soon as the BTC pipeline is functional. The railway transportation of oil is quite

  6. Recommendations for main line block valves installation in gas pipelines; Recomendacoes para instalacao de valvulas de bloqueio de linha tronco em gasodutos

    Energy Technology Data Exchange (ETDEWEB)

    Frisoli, Caetano [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil); Oliveira, Valeriano Duque de [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Cases of gas pipelines block valves and its pneumatic actuators presenting problems during the final pipeline commissioning and pre-operation phases, like internal leaks, leaking to the atmosphere, pneumatic circuit defects caused by water and debris, are nearly common. The majority can be avoided if a series of measuring are to be planned and implemented, as well as if an adequate planning of commissioning operations and line gasification, valves and actuators, are to be applied. This paper shows the practical experience in the construction and commissioning of valves and its actuators in the Bolivia-Brazil gas pipeline, which, in the first construction phase had a series of problems. After the diagnosis a set of procedures was implemented in the secondary construction phase, resulting in insignificant problems detected. All measures and procedures taken in the planning process, as well as additional aspects related to the main line valve design, its by-passes and supports, are demonstrated. (author)

  7. Oil transport scheduling in a pipeline with a characteristic operation; Otimizacao das operacoes de transporte de derivados em um poliduto com multiplas sangrias

    Energy Technology Data Exchange (ETDEWEB)

    Kira, Guilherme; Magatao, Leandro; Arruda, Lucia Valeria Ramos; Silva, Marcos Henrique da [Universidade Tecnologica Federal do Parana (UTFPR), Curitiba, PR (Brazil); Lara, Lucas El Ghoz [Petroleo Brasileiro S.A (PETROBRAS), Rio de Janeiro, RJ (Brazil); Ribas, Paulo Cesar [Petroleo Brasileiro S.A (CENPES/PETROBRAS), Rio de Janeiro, RJ (Brazil). Centro de Pesquisa e Desenvolvimento

    2012-07-01

    This work presents an optimization structure to support the operational decision making of scheduling activities in a multi product pipeline with multiple deliveries. This pipeline connects, in sequence, 6 operational areas: one is the main refinery, and the 5 remaining are distribution centers, each one with specific capacity of storage. Basically, the refinery pumps derivatives, such as diesel and gasoline, in a unidirectional flow to distribution centers, in a way to supply their demands. The solution kernel is underlined in a hybrid structure, using heuristics and Mixed Integer Linear Programming (MILP) modeling, executed iteratively. Details of storage curves and flow rate of pipelines are obtained in the proposed approach, expanding the results of Kira et al. (2010). Additionally, the proposed approach is able to deal with discrete demands along the scheduling horizon. Thus, this hybrid structure makes possible to obtain operational scheduling solutions at a low CPU times (few minutes), using real data scenarios, whose horizon length has at least 30 days. (author)

  8. Successful Geoscience Pipeline Activities for High School and College Students

    Science.gov (United States)

    Furman, T.; Fail, C. F.; Adewumi, M.; Bralower, T.; Guertin, L.

    2004-12-01

    The proportion of African-American students in the College of Earth and Mineral Sciences (EMS) at Penn State is 3.3 percent, only slightly lower than the overall University Park campus proportion of 4 percent. Retention rates within EMS are excellent; a recent survey found that EMS ranks highest in student satisfaction overall at the University Park campus. Our goal to increase diversity in EMS disciplines requires us to attract new students to Penn State rather than recruiting from other areas within the institution. We have implemented three programs that appear successful in this regard, and are thus likely to form a viable pipeline from high school through graduate school. These programs operate at a college-wide level and are co-sponsored by AESEDA (Alliance for Earth Science, Engineering and Development in Africa). SEEMS (Summer Experience in EMS) is a partnership with Upward Bound Math and Science, adding 30 hours of directed research to their existing enrichment program. Students identified in 9th grade spend 6 weeks each summer in residence at PSU, where they receive classroom instruction in core academic areas in addition to a group research project led by faculty and graduate students. SEEMS students are likely PSU recruits: all are accepted to college, 85 percent plan to attend college within PA, and all have strong family support for education as well as for careers in EMS. Pre- and post-experience surveys indicate strong positive changes in perception of EMS careers, particularly with regard to levels of intellectual challenge and starting salary. We maintain personal contact with these students and encourage them to attend PSU when they graduate. SROP (Summer Research Opportunity Program) is administered by the Committee on Institutional Cooperation, the academic arm of the Big 10, and provides residential research internships for students from HBCU and MSI campuses. EMS participates in SROP by funding research interns and providing strong individual

  9. Vale do Aco pipeline: pipeline natural gas implementation in ArcelorMittal Monlevade steel work; Gasoduto Vale do Aco: implantacao do gas natural via gasoduto na ArcelorMittal Monlevade

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Eduardo Sergio da Silva; Arantes, Luiz Flavio Mourao; Ribeiro, Vicente Aleixo Pinheiro [ArcelorMittal Monlevade, Joao Monlevade, MG (Brazil)

    2011-12-21

    Since September 2010, ArcelorMittal Monlevade has gained flexibility and an important opportunity to reduce the cost of its energy mix due to the arrival of the Natural Gas (NG) via Steel Valley Pipeline. The proposal of the project included the substitution of the Liquefied Petroleum Gas (LPG), Fuel Oil and Compressed Natural Gas for natural gas via pipeline. To support the investment decision, in addition to domestic economic and technical aspects, the macro economic environment concerning the NG was also taken into account. This paper shows the analysis for adjustment of internal equipment, the structure of the contract, the conceptual project of the gas distribution built inside the main events, the gains achieved, the alternatives for the acquisition of NG and operational flexibility of ArcelorMittal Monlevade in case of interruption of supply of natural gas. (author)

  10. From leaky pipeline to irrigation system: minority education through the lens of community-based participatory research.

    Science.gov (United States)

    James, Rosalina; Starks, Helene; Segrest, Valerie Ann; Burke, Wylie

    2012-01-01

    Higher education has long made efforts to increase underrepresented minority participation in biomedical research and health fields. However, relatively few minority trainees complete advanced degrees or proceed to independent research careers, a loss referred to as the "leaky pipeline." Minority trainees may take alternate pathways to climbing the academic ladder, exiting to pursue multiple disciplinary or community-serving roles. The authors propose a model for understanding minority departures from the education pipeline as a basis for supporting careers that align with community goals for health. Concepts of the traditional pipeline training model are compared with a model that aligns with community-based participatory research (CBPR) principles and practices. The article describes an irrigation model that incorporates informal learning from academic and community knowledge bases to prepare trainees for CBPR and interdisciplinary research. Students serve as agents that foster individual, institutional, and social change needed to address health problems while attending to root causes of disparities. Viewing minority students as agents for community engagement allows institutions to reassess the role training can play in diversifying participation in higher education and research. An irrigation model supports development of an infrastructure that optimizes success at all post-secondary levels, and enhances CBPR capacity wherever trainees live, work, and learn. Linking formal education to informal learning in context of CBPR experiences can also reduce community mistrust of research while nurturing productive research partnerships with communities to address health disparities.

  11. Development of a robotic system of nonstripping pipeline repair by reinforced polymeric compositions

    Science.gov (United States)

    Rybalkin, LA

    2018-03-01

    The article considers the possibility of creating a robotic system for pipeline repair. The pipeline repair is performed due to inner layer formation by special polyurethane compositions reinforced by short glass fiber strands. This approach provides the opportunity to repair pipelines without excavation works and pipe replacement.

  12. 49 CFR 195.557 - Which pipelines must have coating for external corrosion control?

    Science.gov (United States)

    2010-10-01

    ... corrosion control? 195.557 Section 195.557 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.557 Which pipelines must have coating for external corrosion control? Except bottoms of aboveground breakout tanks, each...

  13. 77 FR 48112 - Pipeline Safety: Administrative Procedures; Updates and Technical Corrections

    Science.gov (United States)

    2012-08-13

    ... Process Maximum administrative civil penalties. Section 2 of the Pipeline Safety Act of 2011 increased the... 190, 192, 193, 195, and 199 [Docket No. PHMSA-2012-0102] RIN 2137-AE29 Pipeline Safety: Administrative... the administrative civil penalty maximums for violation of the pipeline safety regulations to conform...

  14. 18 CFR 357.3 - FERC Form No. 73, Oil Pipeline Data for Depreciation Analysis.

    Science.gov (United States)

    2010-04-01

    ... Pipeline Data for Depreciation Analysis. 357.3 Section 357.3 Conservation of Power and Water Resources... No. 73, Oil Pipeline Data for Depreciation Analysis. (a) Who must file. Any oil pipeline company requesting new or changed depreciation rates pursuant to part 347 of this title if the proposed depreciation...

  15. Blending Hydrogen into Natural Gas Pipeline Networks: A Review of Key Issues

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W.; Antonia, O.; Penev, M.

    2013-03-01

    The United States has 11 distinct natural gas pipeline corridors: five originate in the Southwest, four deliver natural gas from Canada, and two extend from the Rocky Mountain region. This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipelines.

  16. Blending Hydrogen into Natural Gas Pipeline Networks. A Review of Key Issues

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Antonia, O. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-03-01

    This study assesses the potential to deliver hydrogen through the existing natural gas pipeline network as a hydrogen and natural gas mixture to defray the cost of building dedicated hydrogen pipelines. Blending hydrogen into the existing natural gas pipeline network has also been proposed as a means of increasing the output of renewable energy systems such as large wind farms.

  17. An analysis of perceptions and awareness of risk associated with energy pipelines in South Africa

    Directory of Open Access Journals (Sweden)

    Tatenda Mbara

    2011-11-01

    Full Text Available Worldwide, there has been a rapid growth in the use of pipelines to transport energy products. Due to the strategic nature of energy products that are transported by pipelines, the importance of risk awareness, assessment and management cannot be over-emphasised. With the risk of pipeline disruptions increasing globally, energy pipeline organisations are compelled to incorporate measures that should help to identify and address areas that can lead to energy pipeline disruptions. The incorporation of such measures for any organisation is premised on an understanding and appreciation of the risks involved. Given the strategic importance of energy pipelines, the main purpose of this paper is to establish whether the South African energy pipeline sector and the public at large appreciate the risks associated with energy pipelines. Thus, the paper seeks to ascertain awareness of the risks associated with the energy pipeline's physical environment, not only from the energy pipeline operators, but also from communities who are exposed to such risks. Data for the study was collected from energy pipeline operators and from a selected residential area in Johannesburg using both structured and unstructured questionnaires. The findings show that the corporate energy sector in South Africa is aware of risks associated with energy pipeline supply chains while the general public's awareness is very low.

  18. 30 CFR 250.1016 - Granting pipeline rights-of-way.

    Science.gov (United States)

    2010-07-01

    ... application and other required information are found to be in compliance with applicable laws and regulations... AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of-Way § 250.1016 Granting pipeline rights-of-way. (a) In considering an application for a right-of-way, the...

  19. 75 FR 34959 - Five-Year Review of Oil Pipeline Pricing Index

    Science.gov (United States)

    2010-06-21

    ...] Five-Year Review of Oil Pipeline Pricing Index June 15, 2010. AGENCY: Federal Energy Regulatory... comments on its five-year review of the oil pipeline pricing index established in Revisions to Oil Pipeline..., 1991-1996] ] 30,985 (1993). Specifically, the Commission proposes to use the Producer Price Index for...

  20. Minority Students of Color and the Psychology Graduate Pipeline: Disquieting and Encouraging Trends, 1989-2003

    Science.gov (United States)

    Maton, Kenneth I.; Kohout, Jessica L.; Wicherski, Marlene; Leary, George E.; Vinokurov, Andrey

    2006-01-01

    Trends since 1989 in the minority graduate pipeline in psychology are examined, with special focus on trends in recent years. Encouraging trends generally outweigh troubling ones at lower levels of the pipeline. However, in recent years disquieting trends dominate at the higher pipeline levels. Promising trends include a rise in the percentage (to…