WorldWideScience

Sample records for tolt river hydroelectric

  1. Andres Tolts 60 : omanäoliste vaikelude imeline maailm / Andres Tolts ; intervjueerinud Tiina Kolk ; kommenteerinud Jaan Elken

    Index Scriptorium Estoniae

    Tolts, Andres, 1949-2014

    2009-01-01

    Andres Toltsi näitused "Asjad" Hobusepea galeriis 12. oktoobrini, "Näitus" Tallinna Kunstihoones 25. oktoobrini, "Varane Tolts" Haus galeriis 13. novembrini. Pikemalt näitusest "Näitus", kuraator Harry Liivrand

  2. [Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].

    Science.gov (United States)

    Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping

    2011-05-01

    Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.

  3. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  4. Ecological impact from large constructions of hydroelectric power plants in Parana River, Brazil

    International Nuclear Information System (INIS)

    Bonetto, Argentino A.

    1992-01-01

    An analysis over environmental impacts on Parana River as a result of the hydroelectric power plants construction is presented. Hydroelectric dams, also including the planned ones, are showing during the explanation, and biologic aspects are discussed. 30 refs., 4 figs., 2 tabs

  5. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Science.gov (United States)

    2013-08-09

    ... DEPARTMENT OF ENERGY [OE Docket No. PP-387] Application for Presidential Permit; Soule River Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery...

  6. A Computed River Flow-Based Turbine Controller on a Programmable Logic Controller for Run-Off River Hydroelectric Systems

    Directory of Open Access Journals (Sweden)

    Razali Jidin

    2017-10-01

    Full Text Available The main feature of a run-off river hydroelectric system is a small size intake pond that overspills when river flow is more than turbines’ intake. As river flow fluctuates, a large proportion of the potential energy is wasted due to the spillages which can occur when turbines are operated manually. Manual operation is often adopted due to unreliability of water level-based controllers at many remote and unmanned run-off river hydropower plants. In order to overcome these issues, this paper proposes a novel method by developing a controller that derives turbine output set points from computed mass flow rate of rivers that feed the hydroelectric system. The computed flow is derived by summation of pond volume difference with numerical integration of both turbine discharge flows and spillages. This approach of estimating river flow allows the use of existing sensors rather than requiring the installation of new ones. All computations, including the numerical integration, have been realized as ladder logics on a programmable logic controller. The implemented controller manages the dynamic changes in the flow rate of the river better than the old point-level based controller, with the aid of a newly installed water level sensor. The computed mass flow rate of the river also allows the controller to straightforwardly determine the number of turbines to be in service with considerations of turbine efficiencies and auxiliary power conservation.

  7. Hydraulic potential evaluation for micro - scale hydroelectric generation at Chicamocha River Basin - micro - scale hydroelectric plants

    International Nuclear Information System (INIS)

    Pacheco P, C.M.; Parga C, G.M.

    1995-01-01

    In development of technical and scientific cooperation treaty carried out between INEA (today Ingeominas) and Catholic University of Colombia, was elaborated the program: Potential Evaluation Hydraulic for Small hydroelectric plants; whose purpose is to carry electrical energy service to smaller populations and rural zones to all municipalities of country. To begin the program was selected the corresponding area to Chicamocha River Basin, the one which corresponds to 72 Municipalities of Boyaca and Santander Departments, due to the fact that is had good information area originating from diagnostic elaborated by INDERENA with the objective of formulating the Classification Plan and the Basin Managing. This Thesis consists of: 1. To identify all micro-basins; 2. To analyze energy demand on part of kernels of population seated in the study area; 3. To evaluate energy generating capacity of water currents and 4. As of the obtained results, to propose alternative for small hydroelectric plants design (PCH) according to defined needs

  8. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  9. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  10. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  11. Physicochemical Characteristics of River Water Downstream of a Large Tropical Hydroelectric Dam

    Directory of Open Access Journals (Sweden)

    Teck-Yee Ling

    2016-01-01

    Full Text Available Water quality in the downstream river of a hydroelectric dam may be affected by the structural design and operation. To date, little is known about the water quality downstream of the largest dam in Malaysia, the Bakun hydroelectric dam. Therefore, the objective of the study was to determine the water quality downstream of the dam when the spillway was closed and when it was opened. Results of the study indicate that the dam plays a significant role in regulating the water quality downstream of it. When the spillway was closed, pH and oxygen were lower in the river where DO was below 5 mg/L. When the spillway was opened, the water quality improved in terms of oxygen content (>8.0 mg/L, total sulphide (TS, and chemical oxygen demand (COD but deteriorated in terms of five-day biochemical oxygen demand (BOD5, total ammonia nitrogen (TAN, and total phosphorus (TP. Additionally, the intensity of the impacts, particularly BOD5, COD, and TAN, shows a declining trend as distance from the dam increases. This study shows that impacts on the water quality extend to a distance of 32 km from the dam particularly turbidity and DO and opening the spillway changes the water quality significantly.

  12. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  13. 77 FR 47058 - Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft...

    Science.gov (United States)

    2012-08-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-2079-069--CA] Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft Environmental Impact Statement; Public Meetings a. Date and Time of Meetings: Tuesday, August 28, 2012, from 9:00 a.m. to 11:00 a.m. and...

  14. Hydroelectricity and territories; L'hydroelectricite et les territoires

    Energy Technology Data Exchange (ETDEWEB)

    Rocq, Sylvie [Syndicat Mixte d' Etude et d' Amenagement de la Garonne, 61, rue Pierre Cazeneuve 31200 Toulouse (France); Moor, Jean-Francois; Comeau, Aline [Agence de l' eau Adour-Garonne, 90 rue de Feretra 31078 Toulouse Cedex 4 (France); Thomas, Michael [Etablissement Public Territorial du Bassin de la Dordogne - Epidor, Le Tournepique, 24250 Castelnaud-la-Chapelle (France)

    2012-01-15

    On our river territories, the development of renewable energy and the restoration of the quality of the aquatic ecosystems both illustrate the need to reconcile the different usages of water resources while still guaranteeing proper functioning of the ecosystems. Hydroelectricity is the crux of the problem. Because of its mountainous hydrographic network and its favourable hydrology, the Adour-Garonne basin witnessed large-scale development of its hydroelectric potential throughout the 20. century. Approaching the question of hydroelectricity from the point of view of the river territories puts all the challenges facing them into their true perspective. Two distinct examples in the Adour-Garonne basin illustrate the partnership between the Water Agency and the local authorities in the Garonne and Dordogne basins: on the Garonne River, reconciling water usages with the maintenance of adequate water levels at times of drought; on the Dordogne River, reducing the impact of the hydro-peaking. (authors)

  15. Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The case study is an analysis of the legal, institutional, and financial incentives and obstacles to the development of the hydroelectric potential on the Goose River in Maine. The Goose River project concerns development by a private developer, Maine Hydro-Electric Development Corporation. The project is comprised of a five-dam system, with the first dam located at Swan Lake and the fifth dam about one mile from the sea. It will utilize the 7500 acre-feet of storage capacity of Swan Lake to run the four downstream power stations. The system is designed to generate 430 kWs of total capacity which would be sold to Central Maine Power, the local investor-owned public utility.

  16. Report on the workshop examining the potential effects of hydroelectric development on Beluga of the Nelson River Estuary, Winnipeg, Manitoba, November 6 and 7, 1990

    International Nuclear Information System (INIS)

    Lawrence, M.J.; Paterson, M.; Baker, R.F.; Schmidt, R.

    1992-01-01

    A summary is presented of discussions and conclusions at a workshop held to examine the potential effects of hydroelectric development on beluga whales of the Nelson River estuary in Manitoba. Background information is provided on the estuary, beluga whales and their use of arctic and subarctic estuaries, and hydroelectric development on the Nelson River. Potential impacts of such development on the whales are reviewed in the categories of direct effects of changes in physical-chemical conditions (temperature and discharge), indirect effects of disturbances mediated through the food chain, and effects on socioeconomic conditions that may affect beluga whales. Since the biology of beluga whales and other phenomena of interest in this study are poorly known, recommendations are made for research and monitoring activities in the Nelson River estuary. In general, the workshop participants felt that changes in the estuary due to hydroelectric development would not be large enough to affect beluga whales strongly. 34 refs., 1 fig

  17. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  18. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  19. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark

    International Nuclear Information System (INIS)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-01-01

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs

  20. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  1. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Science.gov (United States)

    2013-05-16

    ... Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of..., Lakeport Hydroelectric Associates and Lakeport Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One, LLC (transferee) filed an application for the transfer of license for the Lakeport Project...

  2. 76 FR 62802 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-10-11

    ... Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National...,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch Potomac River in..., Washington, DC 20426. Please affix ``Jennings Randolph Hydroelectric Project No. 12715-003'' to all comments...

  3. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    International Nuclear Information System (INIS)

    Jidin, Razali; Othman, Bahari

    2013-01-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  4. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    Science.gov (United States)

    Jidin, Razali; Othman, Bahari

    2013-06-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  5. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  6. Hydroelectricity at the crossroad: let us give a new momentum to the first renewable energy. White paper on hydroelectricity

    International Nuclear Information System (INIS)

    2017-01-01

    This publication first indicates some data which illustrate the role, importance and development perspectives of hydroelectricity in terms of energy production and in terms of jobs. It outlines that, due to its high adaptation capacity and flexibility, hydroelectricity is an important factor for territory development, that it has a major role in energy supply safety, in the energy mix, and in decentralised energy production. It proposes an overview of the different types of hydroelectric installations: reservoirs for a flexible production and supply safety, run of river hydro systems for a continuous and renewable energy production, pumped storage power stations for mass storage of electric energy. It proposes an overview of assets of hydroelectric energy: implementation of energy transition on the long term, development of an industrial sector of excellence, a responsible and supportive energy, compatibility between hydroelectricity, biodiversity and water usages. Proposals are then formulated to give electricity a new momentum: a new orientation of national and European policies for a better global consistency, a new orientation of economic choices and tax policy as incentives to maintenance and development of the hydroelectric sector, and a fair compensation of services provided to the electric power system

  7. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  8. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and... Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa...

  9. What share for hydroelectricity in France?

    International Nuclear Information System (INIS)

    Bongrand, Th.; Bouvier, E.; Francois, M.; Martin, J.M.; Tardieu, B.; Vogien, M.; Cruchon, Ph.; Miquel, J.; Gariel, A.; Levasseur, L.; Mallet, J.P.

    2004-01-01

    This document gathers 10 presentations (articles) given at the 2. meeting on hydroelectricity, held at Grenoble on May 2004. The papers present some examples of realizations in the domain of small-hydropower, the R and D in progress and some recent advances in hydraulic engineering, the safety and quality aspects, and the environmental impacts and sustainable development of hydroelectric power: 1 - examples of small hydropower plants in France and in progress at SOGREAH (T. Bongrand); 2 - the pico-power plants implemented on drinkable water networks (E. Bouvier); 3 - MINI-AQUA: the mini-hydro solution (M. Francois); 4 - Grenoble and the Alpine valley, pole of hydraulic and hydroelectric competences (J.M. Martin); 5 - history and R and D (B. Tardieu); 6 - advances in engineering for a forefront industry (M. Vogien); 7 - improvement of hydraulic safety (P. Cruchon); 8 - a ISO 14001 certification experience in the domain of hydroelectricity (A. Gariel); 9 - the Rhone river development, reserved flow rate and sustainable development (L. Levasseur); 10 - small hydropower: impact and integration (J.P. Mallet). (J.S.)

  10. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  11. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  12. Cross currents : hydroelectricity and the engineering of northern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Manore, J.L. [Calgary Univ., AB (Canada)

    1999-05-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations` peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario`s north and south. refs., figs.

  13. Cross currents : hydroelectricity and the engineering of northern Ontario

    International Nuclear Information System (INIS)

    Manore, J.L.

    1999-01-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations' peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario's north and south. refs., figs

  14. Environmental analysis report for the hydroelectric project on the Sheldrake River in the Courbe du Sault section in the municipality of Riviere-au-Tonnerre by the Societe d'energie riviere Sheldrake Inc

    International Nuclear Information System (INIS)

    Michaud, A.; Paul, M.; Brunet, G.

    2010-01-01

    The Societe d'energie riviere Sheldrake Inc. (SERS Inc.) is planning to exploit the hydroelectric potential of the Sheldrake River in the Quebec municipality of Riviere au Tonnere. The proposed project will involve building a hydroelectric power station with a maximum capacity of 25 MW on the Sheldrake River, in the Courbe du Sault section. The project will also comprise a dam, a water reservoir and an overflow spillway. The project meets the province's 2006-2015 energy strategy to develop small-scale hydroelectric facilities. The project was subject to an environmental assessment as required by the province of Quebec. This environmental analysis addressed the major challenges facing the hydroelectric development at the Courbe du Sault section of the River, notably the impact on fish habitat, wetlands and the local and regional economic benefits. The environmental assessment did not indicate any habitat destruction for trout or salmon in the forebay. The Quebec Ministry of Sustainable Development, Environment and Parks has deemed the project to be acceptable given that certain conditions are met, including thresholds to stabilize the water level and the construction of a downstream fish passage facility to allow for safe fish migration. 22 refs., 2 tabs., 5 figs., 3 appendices.

  15. Battle looms over hydroelectric dam relicensing

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    Environmental groups, buoyed by support from influential lawmakers, are vowing to change the Federal Energy Regulatory Commission's (FERC's) hydroelectric relicensing procedures. For too long, the groups say, the hydroelectric industry has benefitted from a cozy relationship with the FERC, which has emphasized economic over environmental considerations. The success or failure of the environmentalists agenda will likely prove critical to the hydroelectric industry. With 237 hydroelectric licenses up for renewal this year - the most ever considered by the FERC in one year - and four vacant seats at the Commission, FERC hydro policy appears poised for upheaval. The groups have proposed a multipoint program to address perceived shortcomings in the FERC's hydroelectric relicensing procedures. The program includes recommendations to: Shorten dam licenses (which currently stretch 30 to 50 years) and require the FERC to periodically reevaluate the terms of hydropower licenses; Increase Congressional oversight of the FERC to assure adherence to environmental laws, including the National Environmental Policy Act, which mandates the preparation of environmental impact statements where appropriate; Mandate facilities for upstream and downstream fish passage; Establish a mitigation fund, collectable from dam owners, for river conservation and restoration programs; Promote all alternatives to relicensing projects, including denial of project licenses; and Reassign the FERC's hydropower jurisdiction to another federal agency, such as the Environmental Protection Agency or the Department of the Interior

  16. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  17. 76 FR 70437 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... original license for the 3.7-megawatt (MW) Gathright Hydroelectric Project located on the Jackson River in...

  18. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  19. The effects of run-of-river hydroelectric power schemes on invertebrate community composition in temperate streams and rivers.

    Science.gov (United States)

    Bilotta, Gary S; Burnside, Niall G; Turley, Matthew D; Gray, Jeremy C; Orr, Harriet G

    2017-01-01

    Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the evenness of the invertebrate community. However, no statistically significant effects were detected on the four other metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future invertebrate community impact studies.

  20. 77 FR 34030 - BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-06-08

    ... Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Date Filed: March 21, 2012. d. Submitted By: BOST1 Hydroelectric LLC (BOST1). e. Name of Project: Coon Rapids Dam Hydroelectric Project. f. Location: Mississippi River in Hennepin and Anoka counties...

  1. Feasibility assessment, Lowell Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    The results are presented of a feasibility analysis for hydroelectric generating facilities on the Merrimack River at Lowell, Massachusetts. The projected facility would utilize the existing Pawtucket Dam and a portion of the existing Northern Canal. The project was examined for economic, engineering, and environmental viability, and the results are favorable. The owners intend to proceed to the next step of negotiating a firm power purchase agreement.

  2. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  3. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    Science.gov (United States)

    Bilotta, Gary S; Burnside, Niall G; Gray, Jeremy C; Orr, Harriet G

    2016-01-01

    The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (pcomposition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.

  4. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    Science.gov (United States)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  5. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electr icity, the quantum of which depends on systemic variables viz: plant efficiency, volumetric water flow through the turbine and ...

  6. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    Science.gov (United States)

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  7. Effects from Tucurui Hydroelectric Power Plant on ichthyofauna composition of experimental fisheries by gillnets in Lower Tocantins River, Para State, Brazil

    International Nuclear Information System (INIS)

    Ataliba Nogueira Leite, Regina de.

    1993-01-01

    Tucurui was the first big hydroelectric built in the Brazilian Amazonia (river Tocantins, Para). About 2400 Km 2 of Tropical Rain Forest was inundated. This work attempts to describe some effects of the Tucurui dam upon fish communities of the lower Tocantins river. Surveys of fish communities on the Tocantins were carried out by INPA, before and after the impoudment. Fishes belonging to 223 species was sampled by gillnets. After the impoudment, the average of species richness of the communities was reduced in 42% and 50%, respectively downstream and upstream the dam. In the reservoir, where rapids were flooded, species specialized in this habitats virtually disappeared during and after the filling up phase. The relative contribution of the illiophagous, that dominated the samples before the dam closure, downed, while there has been a sudden widespread of fish predators species in the reservoir. These predators dominated until the third year after the impoudment. The cluster analysis provide evidences that, between the species that take advantages of the impoundment, exist a clear succession of dominance. Until the end of sampling period all the study-area remained very instable, so is difficult to foresee the future composition or structure of the communities in the area under influence of Tucurui's Hydroelectric Dam. (author). 68 refs., 46 figs., 12 tabs

  8. Hydroelectric project at Angliers : Investigation and public hearing report

    International Nuclear Information System (INIS)

    Girard, S.; Bouchard, B.

    2003-08-01

    Public hearings were held by the Bureau d'audiences publiques sur l'environnement concerning a proposed hydroelectric development project at Angliers, Quebec. The proposed hydroelectric plant is to be located at the outlet of the Des Quinze reservoir in the Temiscamingue region (northwest of the province). The site is within the municipality of Angliers, approximately 130 kilometres south of Rouyn-Noranda. The project will exploit the hydroelectric potential of the Ottawa River through a dam at Des Quinze reservoir, which is currently the property of the federal government. During the hearings, several issues were raised, and various topics examined. The political and administrative framework was reviewed, as well as the integration of the project within the community. The impacts, environmental as well as economic, were discussed. After careful examination of all the information, the Commission concluded that the hydroelectric project at Angliers was justified and acceptable from an environmental perspective. The expected economic impact on the community was an essential aspect in determining if the project was acceptable. refs., 4 figs

  9. Evaluation Of Hydraulic Potentiality For The Generation Of Hydroelectric To Small Scale In The Basin Of The CHICAMOCHA River - Small Hydroelectric Centrals

    International Nuclear Information System (INIS)

    Pacheco P, Claudia M.; Parga C, Gloria M.

    1995-01-01

    In development of the agreement of technical and scientific cooperation established between the INEA and the Catholic University of Colombia, the program of Evaluation of Hydraulic Potentiality for Small Central was developed, whose purpose is to take the service to smaller population and villages of all the towns of the country. To begin the program the area corresponding to the basin of Chicamocha river was selected, since this region that corresponds to 72 towns of Boyaca and Santander, has good information, thanks to the diagnosis carried out by the Inderena with the purpose of formulating a Plan of Classification and Handling of the Basin. The work consisted on the identification of all the micro basins, the analysis of the demand of energy of the settled population, to evaluate the generating capacity of the flows of water and, according to the results, to propose alternatives for the design of small hydroelectric centrals (PCH) in accordance with the needs

  10. Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.

    Science.gov (United States)

    Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A

    2015-04-01

    Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.

  11. The effects of hydroelectric gates on rivers, hydro-ecological diagnostic and management aid. The Fontauliere example (Ardeche)

    International Nuclear Information System (INIS)

    Valentin, S.

    1996-01-01

    Hydropower generation induces artificial fluctuations of flow and thus of hydrodynamic parameters in rivers, downstream of hydroelectric impoundments. On the Fontauliere river (Ardeche basin, France), the ecological effects of two different hydro-peaking regimes were tested and compared to a reference upstream reach. Fish, invertebrate and epilithic communities were surveyed in these reaches. The results enables to classify the factors responsible for the observed effects. The base flow between peaks was the most important for the studied site. When it was too low, aquatic communities were de-structured in comparison with the natural reach. These results enabled to suggest a current velocity threshold to respect in order to determine acceptable base flow for this type of stream. They also enabled to guide for the impact evaluation of hydro-peaking sites. An ecological diagnosis should include the study of the structure and composition of the communities. (author). 22 refs., 2 figs., 4 tabs

  12. Urban green areas as the starting point for planning hydroelectric and urban developments: The case of the Sava River in the City of Ljubljana

    Directory of Open Access Journals (Sweden)

    Aleš Mlakar

    2008-01-01

    Full Text Available The article deals with the landscape and urbanistic layout of the Sava River space and North part of the Bežigrad stretch of Ljubljana. Focus is on methodological and content starting points for the layout preparation and development of urban green areas of the wider Sava River space, which as a connecting link and simultaneously independent spatial and functional entity represents the starting point for planning hydro-energetic and urban arrangements. The necessity of recognising and resolving real spatial planning issues, formulation of clear goals and concepts, confrontation of different spatial systems and interests, as well as the sensibility of devising alternative development scenarios are emphasised. One of the most important starting points of the proposed layout is comprehensive design of public open spaces and green areas. The urbanistic solution relies on a programmatically strong, distinct and structured Dunajska Street, which should transform into the public space of a modern urban artery, with a clear ending that simultaneously gradually adapts to the morphology akin to the surroundings and Sava River space. Because of its natural characteristics, preserved cultural landscape and good accessibility, this area has great potential for development of leisure activities. The proposed solution stems from the fact that the chain of hydro-electric plants shouldn't be seen as buildings with negative environmental effects, but also as development opportunities – the actual execution of a recreation area along the Sava River and a method for rehabilitating the degraded spaces. Comprehensive solutions along the river have been proposed as parts of the hydro-electric developments, with special attention focusing on active design of various riverbank types.

  13. Which hydroelectric potential in your region?

    International Nuclear Information System (INIS)

    2011-01-01

    Illustrated by photos, maps, figures and graphs, this Power Point presentation outlines the important remaining potential of hydroelectricity in France: 10.6 TWh. It indicates how this potential has been assessed and calculated. Even if possibilities exist everywhere (either by building new dams or by exploiting existing weirs), four regions present a higher potential for new works: Rhone-Alpes, Midi-Pyrenees, Auvergne, and Provence-Alpes-Cote d'Azur. Maps indicate the concerned rivers and locations in some regions. Such projects which could boost economic local, regional and national development must be designed while taking planning tools into account (notably the climate-air-energy regional schemes), and rules related to river preservation

  14. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark; Konsekvensutredning av kraftutbyggingsprosjekt i Grunnaai i Seljord, Telemark

    Energy Technology Data Exchange (ETDEWEB)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-12-31

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs.

  15. Report of the joint review panel : Glacier Power Ltd Dunvegan Hydroelectric Project, Fairview, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-19

    This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.

  16. Refurbishment and upgrading of Iron Gates I Hydroelectric and Navigation System on the Danube River

    International Nuclear Information System (INIS)

    Scvortov, F.; Vasiliu, A.; Rosca, N.

    1996-01-01

    This work shows the problems of the refurbishing the hydroelectric units of the Iron Gates 1 Hydroelectric and Navigation System, operating since 1970. Their long and intensive utilization leads to the necessity of their refurbishment. One is demonstrated by detailed studies that it is sensible and efficient to perform both rehabilitation of the existent hydroelectric units and their power increasing from 175 MW to 190 MW, and prior to all these, as a first step, to install an additional hydroelectric unit (G7) for each system with a capacity of 190 MW. Complex technical and energetic-economical problems appear in realizing this objective due to the necessity of analysing a great volume of data in view of taking a correct decision. (author). 7 figs

  17. Environmental study of the Wairakei Power Plant. [Effects of hydroelectric power plant on ecology of Waikato River Basin, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Axtmann, R C

    1974-12-01

    Physical, chemical, biological, ecological, and aesthetic aspects of the Wairakei Power Plant are examined, in varying detail, but with primary emphasis on the chemical and thermal effluents. When flows are average or higher in the Waikato River, the Plant's environmental effects are not overly severe. However, operating requirements for the Waikato Hydro-electric System are such that the Plant sporadically produces wastes that may affect the human and natural environment adversely. These adverse effects are not presently too serious, but suggestions are made for improving the Plant's overall environmental performance. Although the point is not discussed in detail, it is clear from the results of the study that any additional thermal plants on the Waikato could strain the river's absorptive capacities severely, unless alternative disposal techniques are used for the various effluents.

  18. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  19. A report on the fisheries resources of the lower Nelson River and the impacts of hydroelectric development, 1988 data

    International Nuclear Information System (INIS)

    Swanson, G.M.; Kansas, K.R.; Matkowski, S.M.

    1990-01-01

    Fisheries studies on the lower Nelson River (Manitoba) system have had the goals of gaining an understanding of the fisheries resources present, assessing current and potential impacts of hydroelectric developments, and investigating enhancement or mitigative options. In 1988, a resource inventory of McMillan and 12-Mile Creeks was conducted to increase understanding of brook trout stocks in the Limestone River system. Results indicate that both streams contain self-sustaining populations. Baseline data collection in the Conawapa Forebay of the Nelson River was initiated in 1988. Inventories of fish populations were conducted, focusing on lake sturgeon. Three long-term monitoring projects were continued in 1988, investigating the populations of spawning brook trout, larval brook trout, and anadromy in brook trout. Four major tributaries to the Nelson River were classified on the basis of physical and chemical characteristics in an attempt to understand brook trout distribution patterns. Ten sturgeon were captured in Angling Lake in 1988 and fitted with radio tags to assess the importance of the Angling Lake-Angling River system to Nelson River lake sturgeon. To investigate the feasibility of enhancing brook trout populations in the Nelson River system, baskets of eggs were planted in previously identified spawning areas in three creeks in 1988. The eggs developed and hatched only in CN Creek. The potential for rehabilitating the Kettle River brook trout population by transfer of fish from other rivers was also investigated in 1988. Radio-tagged fish remained in the Kettle River-Long Spruce system throughout the life of the tags and appear to have found suitable summer and winter habitat. 60 refs., 76 figs., 38 tabs

  20. New erection program of the hydroelectric power plant Beznau. Das Neubauprojekt des hydraulischen Kraftwerkes Beznau

    Energy Technology Data Exchange (ETDEWEB)

    Bretscher, B; Hauenstein, W [NOK Nordostschweizerische Kraftwerke AG, Baden (Switzerland)

    1992-02-21

    The projected hydroelectric power plant at Beznau on the Aare river will produce about 43% more electric power than the present hydroelectric power plant. The water level and the buildings in the Aare will remain unchanged, so that the enviromental impact will be relativley slight. The project is in accordance with the building permit so that no adaptations on modifications will be required. (orig.).

  1. Le corps, instrument de connaissance du monde: la connaissance des Anciens Toltèques

    Directory of Open Access Journals (Sweden)

    Mabel Franzone

    2009-10-01

    Full Text Available Cet article traite le corps comme instrument de la connaissance de l’univers. Le corps s’étend vers des contrées infinies, se prolonge, atteint d’autres règnes, cherche l’unité absolue de ce qu’on appelle l’intention. L’intention est le mot clé pour les Anciens Toltèques, réunissant sous ce mot le visible et l’invisible, la volonté de la Nature et celle de l’univers. Le corps n’est qu’un instrument et pour arriver à le parfaire devons chercher la totalité de nous-mêmes, réussir la communication de deux côtés, droit et gauche, aller à la quête d’autres expériences, inimaginables. Les conditions nécessaires sont d’avoir un corps puissant et d’emmagasiner de l’énergie. Tout l’enseignement des sorciers est fondé dans un vrai changement de conception du monde et de la perception de ce monde. L’objectif final est celui de pouvoir choisir sa propre mort ; la vraie, la seule, l’unique liberté de l’homme.

  2. Downstream passage and impact of turbine shutdowns on survival of silver American Eels at five hydroelectric dams on the Shenandoah River

    Science.gov (United States)

    Eyler, Sheila; Welsh, Stuart A.; Smith, David R.; Rockey, Mary

    2016-01-01

    Hydroelectric dams impact the downstream migrations of silver American Eels Anguilla rostrata via migratory delays and turbine mortality. A radiotelemetry study of American Eels was conducted to determine the impacts of five run-of-the-river hydroelectric dams located over a 195-km stretch of the Shenandoah River, Virginia–West Virginia, during fall 2007–summer 2010. Overall, 96 radio-tagged individuals (mean TL = 85.4 cm) migrated downstream past at least one dam during the study. Most American Eels passed dams relatively quickly; over half (57.9%) of the dam passage events occurred within 1 h of reaching a dam, and most (81.3%) occurred within 24 h of reaching the dam. Two-thirds of the dam passage events occurred via spill, and the remaining passage events were through turbines. Migratory delays at dams were shorter and American Eels were more likely to pass via spill over the dam during periods of high river discharge than during low river discharge. The extent of delay in migration did not differ between the passage routes (spill versus turbine). Twenty-eight American Eels suffered turbine-related mortality, which occurred at all five dams. Mortality rates for eels passing through turbines ranged from 15.8% to 40.7% at individual dams. Overall project-specific mortality rates (with all passage routes combined) ranged from 3.0% to 14.3%. To protect downstream-migrating American Eels, nighttime turbine shutdowns (1800–0600 hours) were implemented during September 15–December 15. Fifty percent of all downstream passage events in the study occurred during the turbine shutdown period. Implementation of the seasonal turbine shutdown period reduced cumulative mortality from 63.3% to 37.3% for American Eels passing all five dams. Modifying the turbine shutdown period to encompass more dates in the spring and linking the shutdowns to environmental conditions could provide greater protection to downstream-migrating American Eels.

  3. Bedload transport in a river confluence

    Science.gov (United States)

    Martín-Vide, J. P.; Plana-Casado, A.; Sambola, A.; Capapé, S.

    2015-12-01

    The confluence of the regulated Toltén River and its tributary the unregulated Allipén (south of Chile) has proved dynamic in the last decade. Daily bedload measurements with a Helley-Smith sampler, bed surveys, and grain-size distributions of the two rivers are obtained from a field campaign that lasts 3 months in high-flow season. The goals are to quantify total bedload and to understand the balance between tributary and main river and the bedload distribution in space and texture. The bedload transport varies 200-fold, with a maximum of 5000 t/day. The discharge varies five-fold, with a maximum of 900 m3/s. Two-thirds of the total bedload volume are transported through the deeper area of the cross section and gravel is predominant (64%). Average bedload volumes in the confluence seem unbalanced in favour of the tributary. Main river bedload transport is predominantly at below-capacity conditions, while the tributary bedload transport is at-capacity conditions. This is deemed the main reason of inaccuracy of the bedload predictors. The roles of entrainment into suspension, helical flow, partial transport, and mobile armour are discussed.

  4. Climate change and hydroelectric production

    International Nuclear Information System (INIS)

    Raban, R.R.

    1991-01-01

    Manitoba Hydro is planning for the possibility of climate change, which has the potential to adversely effect its hydroelectric generating potential. Theoretical and physical evidence for a global warming are reviewed, and it is shown that some of Manitoba Hydro's own measurements support a warming hypothesis. The most significant effect on the hydraulic generating system would be associated with diminished river flows. Winter hydraulic generation capability would be reduced if the magnitude of the change were sufficient to cause several freeze-ups and break-ups within a given season. Incidence of transmission line icing would probably increase, permafrost recession may undermine tower foundations, and conductor resistance may increase to increase energy loss. Ice crossings and winter roads would be adversely affected, and a restriction on fossil fuel consumption could limit thermal generation and increase demand for hydroelectric or nuclear energy. Manitoba Hydro is examining a number of no-cost or low-cost options to accomodate potential climate change, using probable maximum precipitation hydrologic technology, research into conductor galloping, line icing detection, and hydrological investigations

  5. 77 FR 15094 - Sawatt Hydroelectric, LLC; Notice of Application for Amendment of Exemption and Soliciting...

    Science.gov (United States)

    2012-03-14

    ... Project: Mechanicsville Hydroelectric Project. f. Location: The project is located on French River, near... and contact information at the end of comments. The Commission strongly encourages electronic filings...

  6. Hydroelectricity and ecological considerations. Falsification of the environmental reality by the opponents of hydropower

    Directory of Open Access Journals (Sweden)

    Andrzej Giziński

    2013-09-01

    Full Text Available Opponents of hydroelectricity claim falsely that hydrotechnical development of the Lower Vistula River constitutes implementation of Edward Gierek’s concept of bringing only environmental damage1. Statements on the negative environmental impact of constructing small hydroelectric power stations (SHPS are equally groundless. Permanent protests against the construction of dams and river damming, regardless of the motivations and will of protesters, increase energy dependence on Russia, and preserves the poor, post-Bierut hydrological situation2. The main fallacy made by hydropower opponents is the alternative treatment of power and environmental purposes. Environmental errors consist in continuous omission of even the most obvious positive ecological effects of constructing river dams and – what is especially reprehensible – inventing non-existent threats, e.g. lethal concentration of toxic heavy metals in deposits of the Włocławek Reservoir or the detrimental impact of warming up water in stage of falls on the fish population below the dam.

  7. Changes in the state territory, systemic changes, the development of ecological thinking and the issues of the utilisation of hydroelectric power in Hungary

    Directory of Open Access Journals (Sweden)

    HAJDÚ Zoltán

    2012-09-01

    Full Text Available Each big river, including the Danube, makes a single system from their spring to their delta or estuary. Wherever we intervene into the system, this will be necessarily affect the whole of that. Thespillover effects are especially striking in the case of the lower reaches, in the Danube River in the Delta area. The utilisation of the hydroelectric power of the Danube River has been continuously on the agenda in the Hungarian areas since the turn of the 19th and 20th centuries, as an economic, planning, development and thenpolitical and environmental issue. The plans made before the World War I featured hydroelectric plants as the carriers of technical and scientific progress. World War I and the subsequent changes of the state borders swept these plans aside. Between the two world wars, the planning of hydroelectric power stations on the Danube wascontinued within the new state borders, two Hungarian governments and prime ministers of the time were fully committed to the construction of three power plants on the Danube River. After World War II, the hydroelectric plant planned on the Hungarian-Czechoslovakian border and its construction became a basic economic and, from the 1980s, an environmental issue. Finally, only a part of the planned hydroelectric power plant system was constructed, and the issue was not finally closed by specific interpretation of the international law. The Danube Strategy of the European Union, the programmes until 2020, the increase of the role of renewable anergies, the nuclear disaster in Japan, and the interests of international navigation filled the debate with new content. Thepossibility of the construction of hydroelectric power plants on the Danube River was “accidentally” put among the official documents of the government in power since 2010. The government declared it had nothing to do with the plans, and the debate has been going on since then.

  8. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  9. Integral ordering of the River Vardar Valley

    International Nuclear Information System (INIS)

    Stavrov, Jordan

    2004-01-01

    From Skopje to Gevgelia, an annual quantity of 4,5 billions M 3 of water flows out of the territory through the Vardar River for only 60 hours. This poses two questions. The first is whether the flowing out of the water can be decelerated, i.e., whether the water can be kept for at least 60 days and the second question is how this can be realized. Construction of 12 hydroelectric power plants is envisaged along Vardar River, i.e., its section extending from Skopje to the border on Greece, which means within a length of 200 km. Two of these are classical hydroelectric power plants (HPP 'Veles' and HPP 'Gradec'), while the remaining 10 hydroelectric power plants are distributed in a cascade along the river course, with small water head of H = 8,20 - 8,50 m and are considered ecological hydroelectric power plants according to European criteria. For us, these represent a new technology of design and construction particularly considering the part referring to the equipment, while in Europe, there is assembly-line production of such equipment. Presented very briefly in the paper shall be the main technical information on these hydroelectric power plants, namely HPP Kukuricani, as a pilot project to be realized by AD ESM. (Author)

  10. Phytoplankton of the portion of the Paranapanema River to be dammed for construction of the Rosana Hydroelectric Plant, Sao Paulo State, Southern Brazil; Fitoplancton do trecho a represar do Rio Paranapanema (Usina Hidreletrica de Rosana), Estado de Sao Paulo, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Bicudo, Carlos E. de M.; Bicudo, Denise de C.; Castro, Ana Alice J. de; Picelli-Vicentim, M. Marcina [Instituto de Botanica, Sao Paulo, SP (Brazil). Secao de Ficologia

    1992-12-31

    The phytoplankton community of the 120 Km long portion of the Paranapanema River located between the Salto Grande Hydroelectric Plant reservoir and the river mouth at the Parana River is surveyed. This part of the river will be dammed for construction of the Rosana hydroelectric System in the State of Sao Paulo, southern Brazil. An inventory was completed for 4 collecting stations, and based on the study of 48 samples gathered bimonthly during the period from November 1985 to September 1986. Each collection is represented by a net concentrated and a raw total phytoplankton sample. Except for the Bacillariophyceae, study of which is still in progress, the other classes present were the following in order of their local representation: Chlorophyceae with 23 taxa, Zygnemaphyceae (= Cyanophyceae) with 9, Tribophyceace (= Xanthophyceae) with 2 each one, and Oedogoniophyceae, Euglenophyceae and Chrysophyceae with a single taxon each, to a total of 55 taxa identified. (author) 27 refs., 6 figs.

  11. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  12. The macroinvertebrates of the Cunene River from the Ruacana Falls ...

    African Journals Online (AJOL)

    The proposed construction of a second hydroelectric power-generating dam on the Cunene (Kunene) River on the Namibia-Angola border, more than 100km downstream of the Ruacana hydroelectric power plant, will have a major influence on the aquatic biota of this river. In order to assess the potential impact of this ...

  13. Aspects of the relations between the hydroelectric constructions and environment

    International Nuclear Information System (INIS)

    Michael, I.

    1993-01-01

    By their dimensions hydroelectric constructions constitute one of the evident examples of man's action upon nature, with favorable as well as unfavorable effects. By using past experience, such effects can be correctly establish and evaluated both by specialists from different fields and by representatives of the local population. The paper proposes several criteria for qualitative characterization of such effects. Some favorable and unfavorable effects of dams, lakes, secondary catchment and derivations are discussed. Also, having in view the water flow distribution which would allow a normal insertion of such construction in the environment, despite of some power production diminish diminishing, two proposals are made concerning possible solutions for secondary catchment and the hydroelectric power stations situated in the upper zones of the rivers. (author). 5 refs

  14. Madawaska River water management review : issues, concerns, solutions

    International Nuclear Information System (INIS)

    1999-01-01

    Public consultations were held by the Public Advisory Committee, the Ontario Ministry of Natural Resources (MNR) and Ontario Hydro (OH) Working Group and Steering Committee, in an effort to develop a water management system for the Madawaska River, that would address public interests such as public safety, maintenance of the aquatic ecosystem and hydroelectric power generation. Provision of long-term opportunities for broad public involvement in the river's management was an additional objective. The report emphasizes the importance of limiting conflicts between hydroelectric generation and recreation/tourism on the Madawaska River, which runs within the Madawaska Highlands, Algonquin Provincial Park and the Upper Ottawa Valley. The major competing uses for water management in the Madawaska River are: (1) hydroelectric generation, (2) flood control, (3) recreation and tourism, and (4) fish and aquatic ecosystems. Each of these are described in detail, with details of the responses to the issue description and recommended actions

  15. A modelling methodology for assessing the impact of climate variability and climatic change on hydroelectric generation

    International Nuclear Information System (INIS)

    Munoz, J.R.; Sailor, D.J.

    1998-01-01

    A new methodology relating basic climatic variables to hydroelectric generation was developed. The methodology can be implemented in large or small basins with any number of hydro plants. The method was applied to the Sacramento, Eel and Russian river basins in northern California where more than 100 hydroelectric plants are located. The final model predicts the availability of hydroelectric generation for the entire basin provided present and near past climate conditions, with about 90% accuracy. The results can be used for water management purposes or for analyzing the effect of climate variability on hydrogeneration availability in the basin. A wide range of results can be obtained depending on the climate change scenario used. (Author)

  16. Environmental evaluation of Turkey's transboundary rivers' hydropower systems

    International Nuclear Information System (INIS)

    Berkun, M.

    2010-01-01

    The hydroelectric power and potential environmental impacts of hydroelectric projects in 2 transboundary rivers in Turkey were assessed. The southeastern Anatolia project (GAP) is expected to encompass 27 dams and 19 hydroelectric power plants. The large-scale project will increase domestic electricity production and help to provide irrigation for large agricultural schemes. The Coruh project will consist of 27 dams and hydroelectric power plants, which are expected to have serious environmental impacts in both upstream Turkey and downstream Georgia. A slowing down of each river's velocity will cause changes in sediment transport, while the storage of water in large reservoirs will alter water quality and cause changes in local micro-climates. Irrigation methods may cause soil erosion and salinization. The construction of 2 GAP dams on the Tigris and Euphrates rivers has caused protest from Syria and Iraq. Economic development in the regions caused by the proposed hydroelectric projects is expected to have significant environmental impacts on woodland and grassland areas. The projects are expected to adversely affect threatened plant, mammal, and fish species. More detailed cumulative impact and environmental impact assessments are needed to evaluate the economic, environmental, and social problems that are likely to arise as a result of the projects. 17 refs., 3 tabs., 6 figs.

  17. Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.

    Science.gov (United States)

    Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min

    2011-11-01

    The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.

  18. Hydroelectricity and sustainable development

    International Nuclear Information System (INIS)

    Dubeau, D.

    1995-01-01

    From 1975 to 1992, hydroelectricity helped reduce greenhouse gas emissions in Quebec by 20%. For Hydro-Quebec, energy conservation and hydroelectric development are basic complementary tools for sustainable development. Recent studies show that developing only 50% of economically exploitable hydroelectric potential (30% of the gross theoretical potential) of different regions worldwide would considerably reduce greenhouse gas and SO 2 emissions. However, hydroelectric systems produce environmental and social impacts locally that require mitigative measures. To fulfill its mandate in a sustainable development context, Hydro-Quebec has adopted methods such as integrated resource planning, the assessment of externalities, multi criteria decision tools and public participations

  19. Carbon emission from global hydroelectric reservoirs revisited.

    Science.gov (United States)

    Li, Siyue; Zhang, Quanfa

    2014-12-01

    Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs.

  20. Carbon emission as a function of energy generation in hydroelectric reservoirs in Brazilian dry tropical biome

    International Nuclear Information System (INIS)

    Ometto, Jean P.; Cimbleris, André C.P.; Santos, Marco A. dos; Rosa, Luiz P.; Abe, Donato; Tundisi, José G.; Stech, José L.; Barros, Nathan; Roland, Fábio

    2013-01-01

    Most energy generation globally is fueled by coal and oil, raising concerns about greenhouse gas emissions. Hydroelectric reservoirs are anthropogenic aquatic systems that occur across a wide geographical extent, and, in addition to their importance for energy production, they have the potential to release two important greenhouse gases (GHGs), carbon dioxide and methane. We report results from an extensive study of eight hydroelectric reservoirs located in central and southeastern tropical Brazil. In the Brazilian dry tropical biome reservoirs, emissions (in tons of CO 2 Eq. per MW h) varied from 0.01 to 0.55, and decreased with reservoir age. Total emissions were higher in the reservoir lake when compared to the river downstream the dam; however, emissions per unit area, in the first kilometer of the river after the dam, were higher than that in the reservoir. The results showed, despite higher carbon emissions per energy production in the youngest reservoirs, lower emission from hydroelectric reservoirs from the studied region in relation to thermo electrical supply, fueled by coal or fossil fuel. The ratio emission of GHG per MWh produced is an important parameter in evaluating the service provided by hydroelectric reservoir and for energy planning policies. - Highlights: ► Hydroelectric reservoirs construction is growing worldwide. ► The effect of hydropower reservoir in the carbon cycle is dependent on environment characteristics. ► Carbon emissions per energy production are higher in the youngest tropical savannah reservoirs. ► Methane emissions decrease with reservoir age in tropical savannah reservoirs. ► In general, the effect of hydropower in the carbon cycle is lower than other energy sources

  1. Hydroelectric power and hydroelectric power plants. V. 1

    International Nuclear Information System (INIS)

    1991-06-01

    Following the oil crises of 1973 and 1979, there was renewed and justifiable interest in small hydroelectric plants. The maximum power of these plants rarely exceeds 10 MW, and their development will surely increase in the coming decades. Hydraulic power is a national renewable resource, unaffected by geopolitical problems, and above all, non polluting. Many countries with their own hydraulic resources in both the industrialized and the developing world have expressed needs for the development of small hydroelectric plants. Hidroenergia 91 Conference is the opportunity to take stock of knowledge gained in the vast field of small hydroelectric plants. The meeting is divided into four subjects: 1 methods for decision aid; 2 environmental impact and accompanying answers; 3 national development policy; 4 world market and international cooperation. This meeting contains 75 papers, 8 papers are in the INIS scope and 72 papers are in the ENERGY DATA BASE scope

  2. Hydroelectric construction project on the Sheldrake River at Riviere-au-Tonnerre : public inquiry report

    International Nuclear Information System (INIS)

    2009-09-01

    The Societe d'Energie Riviere Sheldrake Inc. has proposed the construction of a hydroelectric facility on the Sheldrake River at Riviere-au-Tonnerre in the regional municipality of Minganie in Quebec. The project involves the construction of a headrace canal, intake, tunnel, powerhouse, access roads, electrical transmission line, spillway, weir and a bridge over the Sheldrake River. The proposed development was subject to an environmental evaluation process and public consultation. Quebec's environmental public hearing board held a public hearing on the draft development of the project to hear the concerns and views of the public and stakeholders. The hearing focused on a number issues, such as reasons for the project, its location and socio-economic impacts. The cumulative environmental effects of the project were also examined. The primary concerns were the economic repercussions of the project and its effect on tourism and fish, including salmon. The Board determined that the project would create jobs in a region affected by unemployment and the decay of its municipalities and that it would stimulate the local and regional economy. However, the Board determined that changes to the project are required to minimize impacts on the natural environment. The project proponent must monitor instream flows to ensure that fish passage facilities meet regulations. In addition, since the proposed project crosses 3 bogs, the developer must compensate for lost wetlands. A 10-year follow-up is required to assess the recovery of these environments. The developer must also maintain the aesthetic quality of the Courbe du Sault Falls in order to maintain the eco-tourism in the region. refs., figs.

  3. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  4. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements

    International Nuclear Information System (INIS)

    Van Keeken, O.A.; Griffioen, A.B.

    2011-11-01

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [nl

  5. Fish and hydroelectricity

    International Nuclear Information System (INIS)

    Zorpette, G.

    1990-01-01

    This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions

  6. Bathymetric surveys of the Neosho River, Spring River, and Elk River, northeastern Oklahoma and southwestern Missouri, 2016–17

    Science.gov (United States)

    Hunter, Shelby L.; Ashworth, Chad E.; Smith, S. Jerrod

    2017-09-26

    In February 2017, the Grand River Dam Authority filed to relicense the Pensacola Hydroelectric Project with the Federal Energy Regulatory Commission. The predominant feature of the Pensacola Hydroelectric Project is Pensacola Dam, which impounds Grand Lake O’ the Cherokees (locally called Grand Lake) in northeastern Oklahoma. Identification of information gaps and assessment of project effects on stakeholders are central aspects of the Federal Energy Regulatory Commission relicensing process. Some upstream stakeholders have expressed concerns about the dynamics of sedimentation and flood flows in the transition zone between major rivers and Grand Lake O’ the Cherokees. To relicense the Pensacola Hydroelectric Project with the Federal Energy Regulatory Commission, the hydraulic models for these rivers require high-resolution bathymetric data along the river channels. In support of the Federal Energy Regulatory Commission relicensing process, the U.S. Geological Survey, in cooperation with the Grand River Dam Authority, performed bathymetric surveys of (1) the Neosho River from the Oklahoma border to the U.S. Highway 60 bridge at Twin Bridges State Park, (2) the Spring River from the Oklahoma border to the U.S. Highway 60 bridge at Twin Bridges State Park, and (3) the Elk River from Noel, Missouri, to the Oklahoma State Highway 10 bridge near Grove, Oklahoma. The Neosho River and Spring River bathymetric surveys were performed from October 26 to December 14, 2016; the Elk River bathymetric survey was performed from February 27 to March 21, 2017. Only areas inundated during those periods were surveyed.The bathymetric surveys covered a total distance of about 76 river miles and a total area of about 5 square miles. Greater than 1.4 million bathymetric-survey data points were used in the computation and interpolation of bathymetric-survey digital elevation models and derived contours at 1-foot (ft) intervals. The minimum bathymetric-survey elevation of the Neosho

  7. Public choice in water resource management: two case studies of the small-scale hydroelectric controversy

    Energy Technology Data Exchange (ETDEWEB)

    Soden, D.L.

    1985-01-01

    Hydroelectric issues have a long history in the Pacific Northwest, and more recently have come to focus on developing environmentally less-obtrusive means of hydroelectric generation. Small-scale hydroelectric represents perhaps the most important of these means of developing new sources of renewable resources to lessen the nation's dependence on foreign sources of energy. Each potential small-scale hydroelectric project, however, manifests a unique history which provides a highly useful opportunity to study the process of collective social choice in the area of new energy uses of water resources. Utilizing the basic concepts of public choice theory, a highly developed and increasingly widely accepted approach in the social sciences, the politicalization of small-scale hydroelectric proposals is analyzed. Through the use of secondary analysis of archival public opinion data collected from residents of the State of Idaho, and through the development of the two case studies - one on the Palouse River in Eastern Washington and the other at Elk Creek Falls in Northern Idaho, the policy relevant behavior and influence of major actors is assessed. Results provide a useful test of the utility of public-choice theory for the study of cases of natural-resources development when public involvement is high.

  8. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  9. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat

  10. Productivity and efficiency analysis of privatized hydroelectric generation with a sometimes free input

    Science.gov (United States)

    Halabi, Claudia Elizabeth

    2000-10-01

    In this paper I use a stochastic distance frontier approach to assess the performance of Chile's hydroelectric industry, which operates within a regulatory framework designed to achieve a competitive outcome. An occasionally free input, water, is the sole energy input. The econometric analysis indicates substantial technical and allocative inefficiencies as well as volatile productivity scores, due presumably to the volatility of the energy input. Some allocative inefficiencies have diminished dramatically as the time under deregulation has grown. The Lerner index suggests that firms in the industry enjoy some degree of market power, reflected by prices that exceed marginal costs. This market power is consistent with operation within a centralized dispatch center, as predicted by a strategic bidding model. I also find that run-of-river plants exhibit increasing returns to scale, while plants relying on dams show slightly diminishing returns. The shadow marginal cost for run-of-river plants is found to be close to zero. Substantial cost savings could be realized if firms in Chile's hydro-electric generation industry were to operate efficiently.

  11. Emissions from hydroelectric reservoirs and comparison of hydroelectricity, natural gas and oil

    International Nuclear Information System (INIS)

    Gagnon, L.; Chamberland, A.

    1993-01-01

    When reservoirs are created, a small fraction of the flooded organic matter decomposes into humic acids, carbon dioxide (CO 2 ), methane (CH 4 ), nitrogen, phosphorus, and other elements. The major greenhouse gases produced are CO 2 and CH 4 . For northern projects, Canadian studies on emissions from hydroelectric reservoirs have reached similar conclusions: Emissions, including methane, are less than 35 kg CO 2 equivalent per MWh. Using a typical project in northern Quebec as the basis for analysis, none of the studies dispute the considerable advantages of hydroelectricity regarding greenhouse gas emissions. Taking into account all components of energy systems, emissions of greenhouse gases from natural-gas power plants are 24 to 26 times greater than emissions from hydroelectric plants. The Freshwater Institute, in an article published in Ambio suggests that emissions from hydroelectric plants could be a significant source of greenhouse gases. This conclusion does not apply to most hydroelectric projects for two reasons: First, the Freshwater Institute's studies concerned flooded peatlands and shallow reservoirs that are not typical of most hydro projects; and second, the Institute analyzed a hydro project with a ratio of flooded area to energy production that is 6 to 10 times higher than typical projects in Canada. 7 refs, 4 tabs

  12. The influence of changes in lifestyle and mercury exposure in riverine populations of the Madeira River (Amazon Basin) near a hydroelectric project.

    Science.gov (United States)

    Hacon, Sandra S; Dórea, José G; Fonseca, Márlon de F; Oliveira, Beatriz A; Mourão, Dennys S; Ruiz, Claudia M V; Gonçalves, Rodrigo A; Mariani, Carolina F; Bastos, Wanderley R

    2014-02-26

    In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents) that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615) and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001) in less isolated communities near to the capital of Porto Velho (median 2.32 ppm) than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm). Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics.

  13. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a preliminary application document to license its proposed Sutton Hydroelectric Project No. 12693. The project would be located at the U.S. Army Corps of Engineers' (Corps...

  14. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  15. Dissolved oxygen analysis for hydropower additions on the Illinois River

    International Nuclear Information System (INIS)

    Sundquist, M.J.; Elver, S.A.

    1993-01-01

    The Illinois Waterway is comprised of a system of eight locks along the Illinois River, the Des Plaines River, and the Chicago Sanitary Ship Canal which allow commercial barge traffic between the Mississippi River and Lake Michigan at the City of Chicago. Opportunities for production of hydroelectric power is present at several of these lock and dams. This paper presents the field study and computer simulation conducted to determine the feasibility of constructing hydroelectric powerhouses on two of these lock and dams. So as not to degrade recent improvements to water quality, the Federal Energy Regulatory Commission (FERC), in issuing the construction and operating licenses for these two hydroelectric facilities, requires the hydropower additions to not reduce the dissolved oxygen (D.O.) level downstream of the hydroelectric facilities below 6 parts per million (ppm). Presently, the waterway discharge passes through taintor gates at both of these lock and dam facilities which creates aeration. The addition of hydroelectric powerhouses would divert water from these spillways through generation equipment; consequently, the spillway aeration would not occur. The purpose of the study was to determine the amount of power generation from these facilities, given the existing waterway water quality and the FERC D.O. criteria. A computer simulation generation analysis was conducted to provide a database of the waterway water quality. A four-month extensive field collection survey was conducted over the 63 kilometer (39 mile) reach of the waterway which comprises the two downstream pools of the Brandon Road and Dresden Island projects, and 3 kilometers (2 miles) upstream of the Brandon Road Project. The analysis revealed that the hydroelectric additions were economically feasible and are an example of how the benefits of hydroelectric development can be balanced with environmental concerns

  16. Environment and hydroelectricity colloquium - Synthesis

    International Nuclear Information System (INIS)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-01

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  17. Dataset of long-term monitoring of ground-dwelling ants (Hymenoptera: Formicidae) in the influence areas of a hydroelectric power plant on the Madeira River in the Amazon Basin.

    Science.gov (United States)

    Fernandes, Itanna O; de Souza, Jorge L P

    2018-01-01

    Biodiversity loss is accelerating rapidly in response to increasing human influence on the Earth's natural ecosystems. One way to overcome this problem is by focusing on places of human interest and monitoring the changes and impacts on the biodiversity. This study was conducted at six sites within the influence area of the Santo Antônio Hydroelectric Power Plant in the margins of the Madeira River in Rondônia State. The sites cover a latitudinal gradient of approximately 100 km in the Brazilian Amazon Basin. The sampling design included six sampling modules with six plots (transects) each, totaling 30 sampling plots. The transects were distributed with 0 km, 0.5 km, 1 km, 2 km, 3 km and 4 km, measured perpendicularly from the river margin towards the interior of the forest. For sampling the ground-dwelling ants, the study used the ALL (ants of the leaf litter) protocol, which is standardized globally in the inventories of ant fauna. For the purpose of impact indicators, the first two campaigns (September 2011 to November 2011) were carried out in the pre-filling period, while campaigns 3 to 10 (February 2012 to November 2014) were carried out during and after the filling of the hydroelectric reservoir. A total of 253 events with a total of 9,165 occurrences were accounted during the monitoring. The ants were distributed in 10 subfamilies, 68 genera and 324 species/morphospecies. The impact on ant biodiversity during the periods before and after filling was measured by ecological indicators and by the presence and absence of some species/morphospecies. This is the first study, as far as we know, including taxonomic and ecological treatment to monitor the impact of a hydroelectric power plant on ant fauna. Until recently, most studies conducted on hydroelectric plants, located in the Amazon Basin, were carried out after the implementation of dams in order to assess their impacts on the environment and biodiversity (Benchimol and Peres 2015, Latrubesse et al. 2017

  18. Mitigation measures for the La Grande 1 hydroelectric development

    International Nuclear Information System (INIS)

    Faucher, O.; Gagnon, R.

    1992-01-01

    Measures to mitigate environmental impacts of the La Grande 1 hydroelectric development are described. An overview is presented of the La Grande 1 project, its surrounding environment, and the principle environmental repercussions of the reservoir, hydrological changes between the dam and river mouth, construction activities and permanent and temporary structures, and presence of workers. Mitigation measures including compensation, corrective measures (deforestation, selective cutting, fish populations, wildlife populations, land rehabilitation, access roads, fisheries, and erosion control), protective measures, enhancement measures, and contract and employment opportunities for the Cree population are described. 10 refs., 2 figs

  19. Attracting finance for hydroelectric power

    International Nuclear Information System (INIS)

    Besant-Jones, John

    1996-01-01

    Hydroelectricity will continue to be important for meeting power requirements in developing countries. Much of the funding required for hydroelectric projects must come from non-government source; hydroelectric projects will therefore need to be attractive to private investors. This note explores the risks investors face, how this can be mitigated, and how the World Bank group can offer advice (as well as finance) to member countries to facilitate investment in hydro electric projects. 3 refs., 1 fig

  20. The Influence of Changes in Lifestyle and Mercury Exposure in Riverine Populations of the Madeira River (Amazon Basin near a Hydroelectric Project

    Directory of Open Access Journals (Sweden)

    Sandra S. Hacon

    2014-02-01

    Full Text Available In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615 and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001 in less isolated communities near to the capital of Porto Velho (median 2.32 ppm than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm. Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics.

  1. Monitoring marginal erosion in hydroelectric reservoirs with terrestrial mobile laser scanner

    Directory of Open Access Journals (Sweden)

    A. M. G. Tommaselli

    2014-06-01

    Full Text Available Marginal erosions in reservoirs of hydroelectric plants have caused economic and environmental problems concerning hydroelectric power generation, reduction of productive areas and devaluing land parcels. The real extension and dynamics of these erosion processes are not well known for Brazilian reservoirs. To objectively assess these problems Unesp (Univ Estadual Paulista and Duke Energy are developing a joint project which aims at the monitoring the progression of some erosive processes and understanding the causes and the dynamics of this phenomenon. Mobile LASER scanning was considered the most suitable alternative for the challenges established in the project requirements. A MDL DynaScan Mobile LASER M150 scanner was selected which uses RTK for real time positioning integrated to an IMU, enabling instantaneous generation of georeferenced point clouds. Two different reservoirs were choose for monitoring: Chavantes (storage plant and Rosana (run-of-river plant, both in the Paranapanema River, border of São Paulo and Paraná States, Brazil. The monitoring areas are scanned quarterly and analysed with base on the point cloud, meshes, contours and cross sections. Cross sections are used to visualize and compute the rate and the dynamics of erosion. Some examples and quantitative results are presented along with an analysis of the proposed technique. Some recommendations to improve the field work and latter data processing are also introduced.

  2. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  3. 76 FR 75543 - Missisquoi River Technologies; Missisquoi River Hydro LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2011-12-02

    ..., Missisquoi River Technologies informed the Commission that its exemption from licensing for the North Troy..., located at 453 East Hill Rd., Middlesex, VT 05602, is now the exemptee of the North Troy Hydroelectric...

  4. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  5. Hydroelectric power in Romania. Past - present - future

    International Nuclear Information System (INIS)

    Bogan, V.

    1996-01-01

    This paper presents an analysis of the past and present situation in hydroelectric power (achievements, rates of commissioning and so on) and the future strategies for the hydroelectric power resource development in the conditions of a free market economy. At present the contribution of hydroelectric power in the Romania's total power balance is about 16,500 GW h/year which represents nearly 28 %. The theoretical hydroelectric power potential of Romania is 75,000 GW h/year while the technical potential, which could actually be developed, is only 40,000 GW h/year. Finally, there are presented the main directions in the hydroelectric power development up to the year 2020. (author) 3 tabs

  6. Evaluate Status of Pacific Lamprey in the Clearwater River Drainage, Idaho: Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Cochnauer, Tim; Claire, Christopher

    2002-12-01

    Recent decline of Pacific lamprey Lampetra tridentata adult migrants to the Snake River drainage has focused attention on the species. Adult Pacific lamprey counted passing Ice Harbor Dam fishway averaged 18,158 during 1962-69 and 361 during 1993-2000. Human resource manipulations in the Snake River and Clearwater River drainages have altered ecosystem habitat in the last 120 years, likely impacting the productive potential of Pacific lamprey habitat. Timber harvest, stream impoundment, road construction, grazing, mining, and community development have dominated habitat alteration in the Clearwater River system and Snake River corridor. Hydroelectric projects in the Snake River corridor impact juvenile/larval Pacific lamprey outmigrants and returning adults. Juvenile and larval lamprey outmigrants potentially pass through turbines, turbine bypass/collection systems, and over spillway structures at the four lower Snake River hydroelectric dams. Clearwater River drainage hydroelectric facilities have impacted Pacific lamprey populations to an unknown degree. The Pacific Power and Light Dam on the Clearwater River in Lewiston, Idaho, restricted chinook salmon Oncorhynchus tshawytscha passage in the 1927-1940 period, altering the migration route of outmigrating Pacific lamprey juveniles/larvae and upstream adult migrants (1927-1972). Dworshak Dam, completed in 1972, eliminated Pacific lamprey spawning and rearing in the North Fork Clearwater River drainage. Construction of the Harpster hydroelectric dam on the South Fork of the Clearwater River resulted in obstructed fish passage 1949-1963. Through Bonneville Power Administration support, the Idaho Department of Fish and Game continued investigation into the status of Pacific lamprey populations in Idaho's Clearwater River drainage in 2001. Trapping, electrofishing, and spawning ground redd surveys were used to determine Pacific lamprey distribution, life history strategies, and habitat requirements in the South

  7. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  8. [Limnetic zooplankton run-off a high-head dam and their fate in a river with high current velocity (case of the Krasnoiarsk hydroelectric power station on the Yenisei river].

    Science.gov (United States)

    Dubovskaia, O P; Gladyshev, M I; Makhutova, O N

    2004-01-01

    The vertical distribution of net zooplankton in head-water of Krasnoyarsk hydroelectric power station and its horizontal distribution in the tail-water were studied during two years in winter and summer seasons. In order to distinguish living and dead individuals the special staining was used. It was revealed that on average 77% of living plankton pass through high-head dam with deep water scoop to the tailwater. While passing through dam aggregates some individuals of the reservoir plankton are traumatized and die, that results in some increase of portion of dead individuals in the tail water near dam (from 3 to 6%). Alive zooplankton passed through the dam aggregates is eliminated under the Upper Yenisei highly turbulent conditions. There is approximately 10% of it in 32 km from the dam if compare with biomass in 20-40 m layer of reservoir, the portion of dead increases to 11%. The biomass of zooplankton suspended in the water column of the tail-water sometimes increases (till > 1 g/m3) due to large Copepoda Heteroscope borealis, which inhabits near-bottom and near-shore river zones and can be found in the central part of the river during reproductive period. Limnetic zooplankton from the reservoir cannot be considered as important food for planktivores in the tail-water.

  9. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  10. Comparative water quality assessment between a young and a stabilized hydroelectric reservoir in Aliakmon River, Greece.

    Science.gov (United States)

    Samiotis, Georgios; Trikoilidou, Eleni; Tsikritzis, Lazaros; Amanatidou, Elisavet

    2018-03-20

    In this work, a comparative study on the water quality characteristics of two in-line water reservoirs (artificial lakes) in Aliakmon River (Western Macedonia, Greece) is performed. Polyfytos Reservoir and Ilarion Reservoir were created in 1975 and 2012 respectively, in order to serve the homonymous hydroelectric stations. In young artificial lakes, severe deterioration of water quality may occur; thus, the monitoring and assessment of their water quality characteristics and their statistical interpretation are of great importance. In order to evaluate any temporal or spatial variations and to characterize water quality of these two in-line water reservoirs, water quality data from measurements conducted from 2012 to 2015 were statistically processed and interpreted by using a modified National Sanitation Foundation water quality index (WQI). The water physicochemical characteristics of the two reservoirs were found to be generally within the legislation limits, with relatively small temporal and spatial variations. Although Polyfytos Reservoir showed no significant deviations of its water quality, Ilarion Reservoir exhibited deviations in total Kjeldahl nitrogen, nitrite nitrogen, total suspended solids, and turbidity due to the inundated vegetation decomposition. The conducted measurements and the use of the modified NSFWQI revealed that during the inundation period of Ilarion Reservoir, its water quality was "moderate" and that the deviations were softened through time, leading to "good" water quality during its maturation period. Three years since the creation of Ilarion Reservoir, water quality does not match that of Aliakmon River (feeding water) or that of the stabilized reservoir (Polyfytos Reservoir), whose quality is characterized as "high." The use of a WQI, such as the proposed modified NSFWQI, for evaluating water quality of each sampling site and of an entire water system proved to be a rapid and relatively accurate assessment tool.

  11. Stabilization of the dyke on the north bank of the La Grande 1 hydroelectric complex

    International Nuclear Information System (INIS)

    Massiera, M.; Tournier, J-P.

    2000-01-01

    Special design features required in constructing a 2444 m long dyke on the north bank of the La Grade River at the site of the La Grande 1 hydroelectric power project are described. The special features involved construction of a downstream bank and upstream stabilization berms to avoid the occurrence of potentially dangerous retrogressive slides. These special features were deemed essential due to the presence of sensitive marine clay, covered with deltaic sand and silt and river sand deposits. The paper highlights the geotechnical and hydrogeological conditions of the northern terrace, and describes the different construction phases of stabilizing the river bank. Control of groundwater pressures in the lower aquifer with relief wells is emphasized. 9 refs., 1 tab., 17 figs

  12. Impacts of hydroelectric dams on alluvial riparian plant communities in Eastern Brazilian Amazonian.

    Science.gov (United States)

    Ferreira, Leandro Valle; Cunha, Denise A; Chaves, Priscilla P; Matos, Darley C L; Parolin, Pia

    2013-09-01

    The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  13. Impacts of hydroelectric dams on alluvial riparian plant communities in eastern Brazilian Amazonian

    Directory of Open Access Journals (Sweden)

    LEANDRO VALLE FERREIRA

    2013-09-01

    Full Text Available The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  14. What factors drive fishery yields in the Lower Shire River, Malawi ...

    African Journals Online (AJOL)

    The Shire River drains from Lake Malawi to the Lower Zambezi River. Annual flow is dependent mainly on lake level, partially controlled by the operation of a barrage at Liwonde to regulate flows for hydroelectricity generation in the escarpment reaches of the river. Downstream of the escarpment, the floodplains of the ...

  15. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  16. Greenhouse gas emissions from hydroelectric reservoirs

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.

    1994-01-01

    In a recent paper, Rudd et al. have suggested that, per unit of electrical energy produced, greenhouse-gas emissions from some hydroelectric reservoirs in northern Canada may be comparable to emissions from fossil-fuelled power plants. The purpose of this comment is to elaborate these issues further so as to understand the potential contribution of hydroelectric reservoirs to the greenhouse effect. More than focusing on the total budget of carbon emissions (be they in the form of CH 4 or be they in the form of CO 2 ), this requires an evaluation of the accumulated greenhouse effect of gas emissions from hydroelectric reservoirs and fossil-fuelled power plants. Two issues will be considered: (a) global warming potential (GWP) for CH 4 ; and (b) how greenhouse-gas emissions from hydroelectric power plants stand against emissions from fossil-fuelled power plants with respect to global warming

  17. A contribution to the methods of determining the optimal exploitation of hydraulically related hydroelectric power plants of different owners

    International Nuclear Information System (INIS)

    Gievski, Igor

    2013-01-01

    For the purpose of solving the water-supply and energy-related problems of the city of Skopje, the need has arisen to construct the 'Skopsko Pole' hydro system. The 'Skopsko Pole' hydro system consists of the power plants 'Kozjak', 'SvetaPetka' and 'Matka'. It is envisioned to use the watercourse of the Treska River and has been envisaged as a multipurpose system, that is, as an anti-flood system, system for irrigation of agricultural land and an electricity producer. Certainly, the meeting of the aforementioned needs will depend on the hydrological potential of the Treska River, which is why an exact and detailed review of the hydrological potential of the Treska River is of vital importance. It is a complex task to determine the optimal work of the hydroelectric power plants built along the same river, even if this is about the so-called run-of-the-water hydroelectric power plants, given the different interests of the water consumers of the same watercourse. This problem will become more complicated if one or more (that is, all) hydroelectric power plants have their own accumulative pools. In this case, the question arises of how the waters of each of the accumulations should be used. During this, we need to bear in mind the fact that every release of water from each of the accumulations alters the elevation points of all the hydroelectric power plants on the same watercourse and thus affects their production and eventually the benefit of their work. With the restructuring of the electric energy systems in different countries over the past 20 years, the vertically integrated power plants have been converted into horizontally integrated ones. In many cases, it is different companies that are the electricity producers, the high-voltage electricity transmitters, and the medium- and low-voltage electricity distributors. Some of these companies are private companies, whereas others are state-owned. Such diverse ownership of the power plants, which are by default

  18. Downstream environmental impacts of dams: case study Tucurui Hydroelectric Plant, PA; Impactos ambientais a jusante de hidreletricas: o caso da usina de Tucurui, PA

    Energy Technology Data Exchange (ETDEWEB)

    Manyari, Waleska Valenca

    2007-12-15

    The hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This study seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotypes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy. (author)

  19. Hindrances to upstream migration of atlantic salmon (Salmo salar) in a northern Swedish river caused by a hydroelectric power-station

    International Nuclear Information System (INIS)

    Rivinoja, P.; Lundqvist, H.

    2001-01-01

    Many Baltic salmon rivers have lost their natural juvenile production due to human activities blocking or reducing access to their spawning grounds, e.g. damming, power generation, partial hinders, etc.. One such hindrance is a hydroelectric complex located in the lower reaches of River Umeaelven in northern Sweden. Water from the forbay created by the dam Norrfors is directed to the Stornorrfors power-station. At times, 100 per cent of the river is directed to the power-station. Water from the power-station then flows via a tunnel and outlet channel to the river. From the point of the tunnel's discharge into the river, the old river bed acts as a bypass channel directing migrating adult fish to a fish ladder located at the base of the dam. In this study, the effect that an additional turbine, that was installed at the power-station in 1986, had on fish passage run-time was examined. Changes in run-time were compared for two periods 1974-1985 and 1986-1995. In 1997, 55 wild and 25 hatchery salmon were captured in the Umeaelven estuary, radio tagged with uniquely coded tags, and tracked upstream. Both manual and automatic loggers were used to locate fish daily. The main findings show that only 26 per cent of the wild salmon and none of the hatchery salmon found the fish ladder. It is suggested that the salmon followed the main water discharge from the power-station outlet and are thus directed away from the entrance to the bypass channel leading to the fish ladder. Salmon respond by moving upstream or downstream depending on the current flow regimes. The bypass channel consists of partial hinders that may explain why it takes on average 52 days for the salmon to migrate 32 km from the estuary to the fish ladder. Adding a fourth turbine at the power-station did not appear to have changed the timing of the migration or the seasonal distribution of the migrating wild salmon through the fish ladder. There was no significant effect of the fourth turbine on the duration

  20. Anthropic contribution on pollution in hydroelectric reservoirs: the case of Sao Simao's hydroelectric power plant - GO/MG, Brazil; Contribuicao antropica na poluicao de reservatorios hidreletricos: o caso da Usina Hidreletrica de Sao Simao - GO/MG

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Gizele Araujo Borba da

    2010-02-15

    This study aimed to evaluate the contribution of anthropogenic pollution in hydroelectric reservoirs through a case study of the Sao Simao Hydropower. The literature relates the problem of eutrophication with the addition of nutrients (nitrogen and phosphorus) in excess, resulting in water pollution. Through data for both tributary rivers and the reservoir, it was found that the Sao Simao dam presents a framework for eutrophication. We made an analysis to see which tributary rivers were the main sources of nutrients released into the waters of the reservoir and a survey of possible human activities that are contributing to the intake of nutrients in these tributaries. (author)

  1. [The mosquito fauna (Diptera: Culicidae) of the environs of the Sayan-Shushenskoe hydroelectric power station].

    Science.gov (United States)

    Gornostaeva, R M

    1999-01-01

    Among females and larvae of mosquitoes collected in 1969, 1981-1984 in the area of the Sayan-Shushenskoe hydroelectric power station (140 km up the Yenisei River from the Abakan city) 5 genera and 30 species were recorded. Based on recent collections and reference data (Gornostaeva e. a., 1969; Gornostaeva, Danilov, 1986) the fauna of the region in question includes 31 species of mosquitoes (Anopheles--1, Culiseta--2, Coquillettidia--1, Aedes--22, Culex--5).

  2. The role of hydroelectric power in energy economy

    International Nuclear Information System (INIS)

    Allet, B.

    1989-01-01

    The state of development and the technical potential of hydroelectric power worldwide, in Europe and in Switzerland are briefly compared with each other. Afterwards, the most important types of hydroelectric power stations and their function in the electricity-distribution network, are put forward. The realistic possibilities of development in Switzerland, up to the year 2025, of each type of hydroelectric power station is judged with regard to the currently valid regulations. The effects of the peoples' initiative - 'towards the salvation of our waters' or for stricter regulations for the protection of water - on the chances of realisation of these possibilities of development are shown. The forseeable decrease in the production of energy by the existing hydroelectric power stations, as a result of the regulation planned for rest water, is judged. Various forecasts for the future quantity of hydroelectric power production in Switzerland are put forward. 6 figs., 7 tabs., 12 refs

  3. Potential effects of hydroelectric dam development in the Mekong River basin on the migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus elucidated by otolith microchemistry.

    Directory of Open Access Journals (Sweden)

    Michio Fukushima

    Full Text Available The migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus, two of the most economically important fish species in the Mekong River, was studied using an otolith microchemistry technique. Fish and river water samples were collected in seven regions throughout the whole basin in Thailand, Laos and Cambodia over a 4 year study period. There was coherence between the elements in the ambient water and on the surface of the otoliths, with strontium (Sr and barium (Ba showing the strongest correlation. The partition coefficients were 0.409-0.496 for Sr and 0.055 for Ba. Otolith Sr-Ba profiles indicated extensive synchronized migrations with similar natal origins among individuals within the same region. H. siamensis movement has been severely suppressed in a tributary system where a series of irrigation dams has blocked their migration. H. lobatus collected both below and above the Khone Falls in the mainstream Mekong exhibited statistically different otolith surface elemental signatures but similar core elemental signatures. This result suggests a population originating from a single natal origin but bypassing the waterfalls through a passable side channel where a major hydroelectric dam is planned. The potential effects of damming in the Mekong River are discussed.

  4. Potential effects of hydroelectric dam development in the Mekong River basin on the migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus) elucidated by otolith microchemistry.

    Science.gov (United States)

    Fukushima, Michio; Jutagate, Tuantong; Grudpan, Chaiwut; Phomikong, Pisit; Nohara, Seiichi

    2014-01-01

    The migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus), two of the most economically important fish species in the Mekong River, was studied using an otolith microchemistry technique. Fish and river water samples were collected in seven regions throughout the whole basin in Thailand, Laos and Cambodia over a 4 year study period. There was coherence between the elements in the ambient water and on the surface of the otoliths, with strontium (Sr) and barium (Ba) showing the strongest correlation. The partition coefficients were 0.409-0.496 for Sr and 0.055 for Ba. Otolith Sr-Ba profiles indicated extensive synchronized migrations with similar natal origins among individuals within the same region. H. siamensis movement has been severely suppressed in a tributary system where a series of irrigation dams has blocked their migration. H. lobatus collected both below and above the Khone Falls in the mainstream Mekong exhibited statistically different otolith surface elemental signatures but similar core elemental signatures. This result suggests a population originating from a single natal origin but bypassing the waterfalls through a passable side channel where a major hydroelectric dam is planned. The potential effects of damming in the Mekong River are discussed.

  5. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  6. Anthropic contribution on pollution in hydroelectric reservoirs: the case of Sao Simao's hydroelectric power plant - GO/MG, Brazil; Contribuicao antropica na poluicao de reservatorios hidreletricos: o caso da Usina Hidreletrica de Sao Simao - GO/MG

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Gizele Araujo Borba da

    2010-02-15

    This study aimed to evaluate the contribution of anthropogenic pollution in hydroelectric reservoirs through a case study of the Sao Simao Hydropower. The literature relates the problem of eutrophication with the addition of nutrients (nitrogen and phosphorus) in excess, resulting in water pollution. Through data for both tributary rivers and the reservoir, it was found that the Sao Simao dam presents a framework for eutrophication. We made an analysis to see which tributary rivers were the main sources of nutrients released into the waters of the reservoir and a survey of possible human activities that are contributing to the intake of nutrients in these tributaries. (author)

  7. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  8. Exploitation of hydropower potentials. EnBW operates run-of-river power plants in Baden-Wuerttemberg; Wasserkraft-Potenziale ausschoepfen. EnBW betreibt in Baden-Wuerttemberg Laufwasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Frey, Martin

    2013-06-01

    For about 100 years power is generated from hydroelectric power on the river Neckar (Federal Republic of Germany). A total hydropower capacity of about 100 megawatts already is installed at the Neckar river. In the Federal State Baden-Wuerttemberg there is certainly the potential for the construction and modernization of hydroelectric power plants. Under this aspect, the contribution under consideration reports on the reconstruction of the run-of-river power plant Schwabenheim nearby Heidelberg (Federal Republic of Germany).

  9. A summary of water chemistry changes following hydroelectric development in northern Manitoba, Canada

    International Nuclear Information System (INIS)

    Williamson, D.A.; Ralley, W.E.

    1993-01-01

    A detailed summary is provided from five major water quality studies undertaken in northern Manitoba to assess the effects of hydroelectric projects on water quality. Physical changes occurring with the area affected by both the Churchill River diversion and Lake Winnipeg regulation have led to water quality changes in many cases. Phosphorus appeared to increase at some sites while decreasing at others, reflecting a new balance between erosion of new P sources and later uptake or deposition. Color declined at all sites except at Red Head Rapids. Turbidity increased in Southern Indian Lake and in the Burntwood River at Thompson in response to the Churchill diversion, but turbidity has historically exceeded drinking water quality objectives. It is unclear whether the observed changes in water chemistry may have the potential to directly impact aquatic life and wildlife. A major limitation of the water quality data set is the lack of pre-development data for many of the trace elements analyzed. Relative to an upstream reference site, concentrations of Cu, Pb, and Zn were slightly higher at some sites affected by hydroelectric development, but it is not known whether this condition existed prior to development. Exceedances of water quality objectives for some trace elements occurred intermittently at some sites but it is not possible to determine whether these exceedances occurred infrequently historically as a result of natural variability. 34 refs., 1 fig., 13 tabs

  10. 77 FR 73636 - Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Science.gov (United States)

    2012-12-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14345-001] Rock River Beach.... c. Date filed: November 23, 2012. d. Applicant: Rock River Beach, Inc. e. Name of Project: Rock River Beach Hydroelectric Project. f. Location: On the Rock River, in the Town of Onota, Alger County...

  11. 77 FR 2966 - Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14345-000] Rock River Beach.... c. Filing Date: January 5, 2012. d. Applicant: Rock River Beach, Inc. e. Name of Project: Rock River Beach Hydroelectric Project. f. Location: On the Rock River, in the Township of Onota, Alger County...

  12. Impacts of the Garafiri hydroelectric dam on the Konkoure estuary

    International Nuclear Information System (INIS)

    Samoura, K.; Waaub, J.P.

    2008-01-01

    This article described the environmental impacts caused by the exploitation of one or several dams in tropical coastal basins. In particular, it proposed a methodological approach for analyzing the vulnerability of ecosystems to modifications caused by the exploitation of the Garafiri hydroelectric dam in Guinea. With an installed power capacity of 75 MW, this dam has been operational since 1999 and has supplied electricity to coastal and mid Guinea since 2000. Since then, the ecosystem of the Konkoure River has undergone important changes. This study focused primarily on impacts during the dry season. Data was collected at different hydroelectric stations along the Konkoure Basin to estimate changes in water flow in the estuary. The study showed several changes, including noticeable impacts on the soil salt content. In addition, changes in vegetation were attributed to changes in soil content. The study revealed that rice production has increased 65 per cent since 2000, while salt exploitation has been completely discontinued. It was concluded that the hydraulic management of the dam can have a significant impact on the region's ecosystem which can in turn influence ecological and social economic functions. It was concluded that the vulnerability of the ecosystem can be worsened in the context of climate change. 25 refs., 9 figs

  13. [Fishery resource protection by artificial propagation in hydroelectric development: Lixianjiang River drainage in Yunnan as an example].

    Science.gov (United States)

    Yang, Yong-Hong; Yang, Jun-Xing; Pan, Xiao-Fu; Zhou, Wei; Yang, Mei-Lin

    2011-04-01

    Hydroelectric developments can result in a number of negative environmental consequences. Conservation aquaculture is a branch of science derived from conservation and population recovery studies on endangered fishes. Here we discuss the impacts on fishes caused by hydropower projects in Lixianjiang, and evaluate effects and problems on the propagation of Parazacco spilurus, Hemibagrus pluriradiatus, Neolissochilus benasi and Semilabeo obscurus. A successful propagation project includes foraging ecology in fields, pond cultivation, juvenile fish raising, prevention and curing on fish disease, genetic management, artificial releasing and population monitoring. Artificial propagation is the practicable act on genetic intercommunication, preventing population deterioration for fishes in upper and lower reaches of the dam. For long-term planning, fish stocks are not suitable for many kind of fishes, but can prevent fishes from going extinct in the wild. Basic data collection on fish ecology, parent fish hunting, prevention on fish disease are the most important factors on artificial propagation. Strengthening the genetic management of stock population for keeping a higher genetic diversity can increase the success of stock enhancement. The works on Lixianjiang provide a new model for river fish protection. To make sure the complicated project works well, project plans, commission contracts, base line monitoring and techniques on artificial reproduction must be considered early. Last, fishery conservation should be considered alongside location development.

  14. The hydroelectric power market in the world

    International Nuclear Information System (INIS)

    Junius, A.

    2004-10-01

    This work makes a synthesis of the hydroelectric power market, of its present day capacity in the world, and of its perspectives of development in the future. The first part treats of the hydroelectric facilities and of the market of hydroelectric power plants. It presents the technology used and the different types of plants, the evolution of their geographical setting and the future potentialities of development. The second part deals with the competitiveness of this industry with respect to: the energy policy stakes, the profitability, the energy independence of countries, the regulation of power networks and the environmental impacts. (J.S.)

  15. Hydroelectric modelling of the Paraiba do Sul and Jequitinhonha rivers sub-basins by using the VALORAGUA computer program; Modelagem hidreletrica das sub bacias dos rios Paraiba do Sul e Jequitinhonha utilizando o programa VALORAGUA

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, Vinicius Verna Magalhaes; Aronne, Ivan Dionysio [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN), Belo Horizonte, MG (Brazil)]. E-mails: vvmf@urano.cdtn.br; aroneid@urano.cdtn.br; Martinez, Carlos Barreira; Versiani, Bruno Rabelo [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Escola de Engenharia. Dept. de Engenharia Hidraulica e Recursos Hidricos]. E-mail: martinez@cce.ufmg.br; versiani@ehr.ufmg.br

    2002-07-01

    This work presents a modelling of 50 hydroelectric power plants in the East Atlantica hydro graphic basin, operating, under construction or as basic projects. The simulations are performed by using the VALORAGUA computer code, developed by the EDP - Eletricidade de Portugal. The studies concentrate mostly on the sub basins of the Jequitinhonha and Paraiba do Sul rivers. The study includes the thermal power plants existent on the same geographical region. Some obtained results such as capacity factors and energy generation values are analysed. Some considerations are made on questions referring to the Brazilian energetic problems.

  16. Spatial variation of sediment mineralization supports differential CO2 emissions from a tropical hydroelectric reservoir.

    Science.gov (United States)

    Cardoso, Simone J; Vidal, Luciana O; Mendonça, Raquel F; Tranvik, Lars J; Sobek, Sebastian; Fábio, Roland

    2013-01-01

    Substantial amounts of organic matter (OM) from terrestrial ecosystems are buried as sediments in inland waters. It is still unclear to what extent this OM constitutes a sink of carbon, and how much of it is returned to the atmosphere upon mineralization to carbon dioxide (CO2). The construction of reservoirs affects the carbon cycle by increasing OM sedimentation at the regional scale. In this study we determine the OM mineralization in the sediment of three zones (river, transition, and dam) of a tropical hydroelectric reservoir in Brazil as well as identify the composition of the carbon pool available for mineralization. We measured sediment organic carbon mineralization rates and related them to the composition of the OM, bacterial abundance and pCO2 of the surface water of the reservoir. Terrestrial OM was an important substrate for the mineralization. In the river and transition zones most of the OM was allochthonous (56 and 48%, respectively) while the dam zone had the lowest allochthonous contribution (7%). The highest mineralization rates were found in the transition zone (154.80 ± 33.50 mg C m(-) (2) d(-) (1)) and the lowest in the dam (51.60 ± 26.80 mg C m(-) (2) d(-) (1)). Moreover, mineralization rates were significantly related to bacterial abundance (r (2) = 0.50, p hydroelectric reservoirs.

  17. Evaluation methodology for flood damage reduction by preliminary water release from hydroelectric dams

    Science.gov (United States)

    Ando, T.; Kawasaki, A.; Koike, T.

    2017-12-01

    IPCC AR5 (2014) reported that rainfall in the middle latitudes of the Northern Hemisphere has been increasing since 1901, and it is claimed that warmer climate will increase the risk of floods. In contrast, world water demand is forecasted to exceed a sustainable supply by 40 percent by 2030. In order to avoid this expectable water shortage, securing new water resources has become an utmost challenge. However, flood risk prevention and the secure of water resources are contradictory. To solve this problem, we can use existing hydroelectric dams not only as energy resources but also for flood control. However, in case of Japan, hydroelectric dams take no responsibility for it, and benefits have not been discussed accrued by controlling flood by hydroelectric dams, namely by using preliminary water release from them. Therefore, our paper proposes methodology for assessing those benefits. This methodology has three stages as shown in Fig. 1. First, RRI model is used to model flood events, taking account of the probability of rainfall. Second, flood damage is calculated using assets in inundation areas multiplied by the inundation depths generated by that RRI model. Third, the losses stemming from preliminary water release are calculated, and adding them to flood damage, overall losses are calculated. We can evaluate the benefits by changing the volume of preliminary release. As a result, shown in Fig. 2, the use of hydroelectric dams to control flooding creates 20 billion Yen benefits, in the probability of three-day-ahead rainfall prediction of the assumed maximum rainfall in Oi River, in the Shizuoka Pref. of Japan. As the third priority in the Sendai Framework for Disaster Risk Reduction 2015-2030, `investing in disaster risk reduction for resilience - public and private investment in disaster risk prevention and reduction through structural and non-structural measures' was adopted. The accuracy of rainfall prediction is the key factor in maximizing the benefits

  18. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  19. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  20. Downstream impacts of a Central Amazonian hydroelectric dam on tree growth and mortality in floodplain forests

    Science.gov (United States)

    Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.

    2017-12-01

    The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration

  1. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  2. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  3. Power market liberalisation: an opportunity for the hydroelectricity?

    International Nuclear Information System (INIS)

    Loth, P.

    2001-01-01

    This article discusses the future of hydroelectricity in the light of the ongoing liberalisation of the European power market. Compared to fossil electricity, hydroelectricity is a renewable energy source, has a limited impact on the environment, is able to meet strong variations of power demand, but is a little bit more costly. Hydroelectric companies expect the introduction of a quality label for their product as well as the increasing awareness of consumers for environmental aspects to become strong incentives for them to subscribe on green energy despite its higher cost. The cost difference will also be partly reduced by the introduction of a pollution tax on fossil energy sources. Figures on hydroelectricity capacity production, currently and in the near future, in the countries surrounding the Alps are presented. As an example, the business strategy of a Swiss electricity utility is shortly described

  4. The greatest hydroelectric power plant in the world. Itaipu Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Andonov - Chento, Ilija

    2004-01-01

    Details to demonstrate the size and engineering achievements of one of the world's greatest hydroelectric power plant are given. Principal technical features of construction and operation of the Itaipu Dam are tabulated and discussed

  5. Evaluation of our hydroelectric resources

    International Nuclear Information System (INIS)

    Unsal, Istemi; Onoz, Bihrat

    2006-01-01

    Because of the geo energetic position of our country, its geo strategic importance becomes even greater due to the fact that one of the basic problems of our century is to meet the energy demand. In this study one of the most significant energy resources of our country, hydroelectric energy production resource has been made of subject and a general evaluation has been performed considering our country's conditions. In meeting countries general energy demands diversity of production sources and resources where they are supplied from shows great importance. Our country is quite rich from the aspect of hydroelectric potential which is the most significant among the renewable energy resources. That is why our hydroelectric potential (HEP) has been investigated by considering Feasibility, Operation Specifications, Economy, External Dependence issues in electrical energy planning.. In our country, it is frequently being emphasized that 35% of our HEP has been evaluated though which HEP is of subject, is not explained. While HEP is defined at 4 levels namely as Gross (GHEP), Technical (THEP), Economic (EHEP) and Evaluated HEPs. Our country is placed in 2nd place in Europe from the aspect of GHEP whereas it is placed as one of the last from the aspect of evaluated HEP. Capacity usage for hydroelectric plants has been foreseen as 40.5% (3548 hours/year) by the 2005-2020 planning prepared by ETKB (Ministry of Energy and Natural Resources). On the other hand, capacity usage has been found as 40.3% for the analysis for realized cases using DSI (State Water Works) 2006 data, which is only 0.5% below the foreseen value.What mainly lowers the realized average is the hard pressure applied to hydraulic plants during the period 1995-1999. The situation which arises as a result of this operation policy is wrongly interpreted by DPT (State Planning Organization) and consequently hydroelectric plants are defined as unreliable. However, since sufficient storage plants which will

  6. EPRI releases strategic plan for hydroelectric R and D

    International Nuclear Information System (INIS)

    Fickett, A.P.

    1993-01-01

    The Electric Power Research Institute has published a report identifying important research needs and issues in the hydroelectric industry. The report is based on results from a survey of representatives of the 1992 North American hydroelectric community. EPRI conducted the survey to expand upon recommendations of the North American Hydroelectric R ampersand D Forum and to develop EPRI's agenda. The report, an EPRI Strategy for Hydropower Research and Development: Rethinking our Water Resource Management Strategies, outlines an agenda for improving the use of water resources and expanding hydroelectric production at existing dams. It also proposes a new, expanded EPRI strategy within the context of the future energy needs of the US and the North American hydro research agenda

  7. Private affairs [Canon del Pato hydroelectric project

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The privatisation of the electric power industry in Peru has caused growth in its hydroelectric generation capacity. Increased interest in hydroelectric power, based on economic considerations, had led to decision on upgrading the two main hydropower plants which will provide almost 100 MW of extra capacity over a three year period, and provide competitively priced electric power. (UK)

  8. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  9. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  10. 78 FR 6319 - Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7019-068] Eastern... an order amending license Article 401 for Eastern Hydroelectric Corporation's (Eastern Hydroelectric....\\1\\ On January 11, 2013, Eastern Hydroelectric filed a request for rehearing of Commission staff's...

  11. Proceedings of the 14. workshop of the Committee on River Ice Processes and the Environment : hydraulics of ice covered rivers

    International Nuclear Information System (INIS)

    Morse, B.; Bergeron, N.; Gauthier, Y.

    2007-01-01

    Ice processes play a significant role in the hydrologic regime of Canadian rivers. The Committee on River Ice Processes and the Environment (CRIPE) identifies high-priority topics for research and development and promotes research programs at Canadian colleges and universities. This workshop reviewed the hydraulic aspects of river ice phenomena in an effort to clarify the effects of ice cover on river flow characteristics. Other issues of concern were also discussed, notably ice formation, ice jams, winter operation of hydroelectric power plants, environmental aspects of river ice, and climate change. The workshop featured 12 poster sessions and 40 presentations, of which 5 have been catalogued separately for inclusion in this database. refs., tabs., figs

  12. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  13. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  14. The Test of Logical Thinking as a predictor of first-year pharmacy students' performance in required first-year courses.

    Science.gov (United States)

    Etzler, Frank M; Madden, Michael

    2014-08-15

    To investigate the correlation of scores on the Test of Logical Thinking (TOLT) with first-year pharmacy students' performance in selected courses. The TOLT was administered to 130 first-year pharmacy students. The examination was administered during the first quarter in a single session. The TOLT scores correlated with grades earned in Pharmaceutical Calculations, Physical Pharmacy, and Basic Pharmacokinetics courses. Performance on the TOLT has been correlated to performance in courses that required the ability to use quantitative reasoning to complete required tasks. In the future, it may be possible to recommend remediation, retention, and/or admission based in part on the results from the TOLT.

  15. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  16. The impact of climate change on hydro-electricity generation

    International Nuclear Information System (INIS)

    Musy, A.; Music, B.; Roy, R.

    2008-01-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs

  17. Spatial variation of sediment mineralization supports differential CO2 emissions from a tropical hydroelectric reservoir

    Directory of Open Access Journals (Sweden)

    Simone Jaqueline Cardoso

    2013-04-01

    Full Text Available Substantial amounts of organic matter (OM from terrestrial ecosystems are buried as sediments in inland waters. It is still unclear to what extent this OM constitutes a sink of carbon, and how much of it is returned to the atmosphere upon mineralization to carbon dioxide (CO2. The construction of reservoirs affects the carbon cycle by increasing OM sedimentation at the regional scale. In this study we determine the OM mineralization in the sediment of three zones (river, transition and dam of a tropical hydroelectric reservoir in Brazil as well as identify the composition of the carbon pool available for mineralization. We measured sediment OC mineralization rates and related them to the composition of the OM, bacterial abundance and pCO2 of the surface water of the reservoir. Terrestrial OM was an important substrate for the mineralization. In the river and transition zones most of the OM was allochthonous (56 % and 48 %, respectively while the dam zone had the lowest allochthonous contribution (7 %. The highest mineralization rates were found in the transition zone (154.80 ± 33.50 mg C m-2 d-1 and the lowest in the dam (51.60 ± 26.80 mg C m-2 d-1. Moreover, mineralization rates were significantly related to bacterial abundance (r2 = 0.50, p < 0.001 and pCO2 in the surface water of the reservoir (r2 = 0.73, p < 0.001. The results indicate that allochthonous OM has different contributions to sediment mineralization in the three zones of the reservoir. Further, the sediment mineralization, mediated by heterotrophic bacteria metabolism, significantly contributes to CO2 supersaturation in the water column, resulting in higher pCO2 in the river and transition zones in comparison with the dam zone, affecting greenhouse gas emission estimations from hydroelectric reservoirs.

  18. Advanced, Environmentally Friendly Hydroelectric Turbines for the Restoration of Fish and Water Quality

    International Nuclear Information System (INIS)

    Brookshier, P.A.; Cada, G.F.; Flynn, J.V.; Rinehart, B.N.; Sale, M.J.; Sommers, G.L.

    1999-01-01

    Hydroelectric power contributes about 10 percent of the electrical energy generated in the United States, and nearly 20 percent of the worlds electrical energy. The contribution of hydroelectric generation has declined in recent years, often as a consequence of environmental concerns centering around (1) restriction of upstream and downstream fish passage by the dam, and (2) alteration of water quality and river flows by the impoundment. The Advanced Hydropower Turbine System (AHTS) Program of the U.S. Department of Energy is developing turbine technology which would help to maximize global hydropower resources while minimizing adverse environmental effects. Major technical goals for the Program are (1) the reduction of mortality among turbine-passed fish to 2 percent or less, compared to current levels ranging up to 30 percent or greater; and (2) development of aerating turbines that would ensure that water discharged from reservoirs has a dissolved oxygen concentration of at least 6 mg/L. These advanced, environmentally friendly turbines would be suitable both for new hydropower installations and for retrofitting at existing dams. Several new turbine designs that have been he AHTS program are described

  19. Baseline greenhouse gas emissions for the lower Churchill hydroelectric generation project in Labrador

    International Nuclear Information System (INIS)

    LeDrew, L.; Bastien, J.; Tremblay, A.

    2007-01-01

    Newfoundland and Labrador Hydro has proposed to develop the hydroelectric potential of the lower Churchill River by constructing generating facilities at Gull Island and Muskrat Falls. This paper presented the results of a study that was conducted to collect baseline data on greenhouse gas (GHG) fluxes/emissions of carbon dioxide (CO 2 ), methane (CH 4 ) and nitrous oxide (N 2 O) from the lower Churchill River, Smallwood reservoir, and natural lakes in the upper and lower Churchill regions. The purpose of the study was to compare GHG fluxes between the lower Churchill River, Smallwood reservoir and those of the nearby natural lakes and to compare GHG fluxes between the Smallwood reservoir and those of boreal reservoirs in northern Quebec. The paper provided a description of the site and the methodology for GHG flux measurement. The results and discussion focused on physical-chemical variables and GHG fluxes. The study results were to be used in the environmental assessment of the project. It was concluded that the lower Churchill River has higher CO 2 fluxes and lower CH 4 fluxes than the Smallwood reservoir and higher CO 2 fluxes than natural lakes in the region. There was no significant difference in N 2 O fluxes between the sampled waterbodies. Both CO 2 and CH 4 fluxes from the lower Churchill River were comparable to other Canadian reservoirs. 12 refs., 2 tabs., 6 figs

  20. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  1. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-06-21

    ... Hydroelectric Company, LLC; Notice Soliciting Scoping Comments June 15, 2010 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  2. Stable isotope characteristics of precipitation of Pamba River basin ...

    Indian Academy of Sciences (India)

    highly essential input function for isotope hydro- ... Wind speed in the Pamba River basin varies from 8.5 to. 13.6 km/hr (NWDA 2008). ... ets of low values in the hill stations of the Ghats ... reservoir for the hydroelectric power production in.

  3. The further environmental development of Polyphyto Hydroelectric Project reservoir in Kozani prefecture and its contribution to the life quality improvement

    Science.gov (United States)

    Saounatsou, Chara; Georgi, Julia

    2014-08-01

    The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.

  4. Accumulated effects on landscape pattern by hydroelectric cascade exploitation in the Yellow River basin from 1977 to 2006

    NARCIS (Netherlands)

    Ouyang, W.; Skidmore, A.K.; Hao, F.H.; Toxopeus, A.G.; Abkar, A.

    2009-01-01

    The accumulated impacts of hydroelectric cascade exploitation (HCE) on the landscape are greater than the simple sum of the impacts from a single dam. The spatial–temporal landscape characteristics resulting from the accumulated impacts of HCE from 1977 to 2006 in Longliu Watershed, a part of the

  5. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  6. Water quality in Italy: Po River and its tributaries

    International Nuclear Information System (INIS)

    Crosa, G.; Marchetti, R.

    1993-01-01

    For Italy's Po River hydrological basin, artificial reservoirs have a great importance; water reserve is about 1600 million cubic meters for the hydroelectric reservoirs and about 76 million cubic meters for irrigation. The principal factors determining the water quality of the Po River and its tributaries are examined. Organic micropollutants, metals and the microbial load are the principal parameters altering the quality of the waters; dilution is the prevailing factor reducing this contamination

  7. Analysis of environmental issues related to small-scale hydroelectric development. III. Water level fluctuation

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-10-01

    Potential environmental impacts in reservoirs and downstream river reaches below dams that may be caused by the water level fluctuation resulting from development and operation of small scale (under 25MW) hydroelectric projects are identified. The impacts discussed will be of potential concern at only those small-scale hydroelectric projects that are operated in a store and release (peaking) mode. Potential impacts on physical and chemical characteristics in reservoirs resulting from water level fluctuation include resuspension and redistribution of bank and bed sediment; leaching of soluble organic matter from sediment in the littoral zone; and changes in water quality resulting from changes in sediment and nutrient trap efficiency. Potential impacts on reservoir biota as a result of water level fluctuation include habitat destruction and the resulting partial or total loss of aquatic species; changes in habitat quality, which result in reduced standing crop and production of aquatic biota; and possible shifts in species diversity. The potential physical effects of water level fluctuation on downstream systems below dams are streambed and bank erosion and water quality problems related to resuspension and redistribution of these materials. Potential biological impacts of water level fluctuation on downstream systems below dams result from changes in current velocity, habitat reduction, and alteration in food supply. These alterations, either singly or in combination, can adversely affect aquatic populations below dams. The nature and potential significance of adverse impacts resulting from water level fluctuation are discussed. Recommendations for site-specific evaluation of water level fluctuation at small-scale hydroelectric projects are presented.

  8. Influence of small hydropower plants on brown trout (Salmo trutta L. population in Mislinja River

    Directory of Open Access Journals (Sweden)

    Blaž Cokan

    2013-12-01

    Full Text Available The brown trout (Salmo trutta L. in the Mislinja River has been endangered for years because of small hydroelectric power plants. To find out how they are affecting the population of the brown trout in the Mislinja River, we conducted a sampling of the brown trout, using a generating set. We measured the length and weight of all caught specimens and analysed the obtained data. The results are presented in this paper, e.g., biomass, estimations of abundance, average weight, average length and number of captured brown trout. We discovered that the population of the brown trout has decreased in all the sections where water has been taken away for small hydroelectric power plants.

  9. The Innavik hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, S.; McNeil, E.; Gacek, J. [RSW Inc., Montreal, PQ (Canada); Atagotaaluk, E. [Pituvik Landholding Corp., Nunavik, PQ (Canada); Henderson, C. [Lumos Energy, Ottawa, ON (Canada)

    2009-07-01

    The village of Inukjuak in northern Quebec is not connected to the main electrical grid. This remote village is one of 14 Inuit communities in the Nunavik administrative region where electricity is generated by diesel thermal power plants under the direction of Hydro-Quebec Distribution's Isolated Grid subdivision. The heating of water and buildings is supplied by heavy fuel-oil. A compensation program for the price of fuel-oil is applied in the community. This presentation discussed the need for developing renewable energy sources in order to respond to the energy demands of isolated grids. The community of Inukjuak plans on developing the water resources of the Inukjuak River in order to produce hydroelectricity and reduce the use of diesel fuel. Several possible development sites were identified. The project will contribute to a reduction in energy costs while reducing greenhouse gas emissions. Revenues generated from the power plant will help the village in their economic development by enabling the completion of various community projects. The sustainable development approach taken for the project was discussed and the project's main technical, environmental and social issues were identified. The project is expected to reduce the production of an estimated 8 tons of carbon dioxide emissions by 2011 and nearly 15 tons after 10 years of operation.

  10. Reflections on hydroelectric dams in the Amazon: water, energy and development

    Directory of Open Access Journals (Sweden)

    Bertha Koiffmann Becker

    2012-12-01

    Full Text Available The essay discusses the deployment of hydroelectric dams in the Amazon having as a starting point the relations between water and hydropower consumption at different scales of analyses. So, if all parts of the world are affected by global processes, they are not in the same way. The global scale is dominated by the apocalyptic discourse of increasing water scarcity and global warming, requiring the reduction of emissions of greenhouse gases through the use of renewable energy and new technologies. On a Brazilian national scale, the problems are, rather, how to manage the abundance of water with social and territorial justice, and how to stop the loss of 20% of the electricity produced. Finally, it is at the regional scale - in the Amazon - that major problems arise: i the biggest paradox between the abundance of water and social inaccessibility to this resource; ii most of the dams planned for the country will be built there, with the risk of negative impacts already known; iii the obligation of building sluices at all the proposed dams, suggested by the industrial sector in name of the rivers navigation, will serve, in fact, to export commodities produced in the Brazilian central region. An ethical question is, therefore, posed to society and to Brazilian government: are really needed so many hydroelectric dams in the Amazon?

  11. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  12. Adaptation potential to climate change of the Peribonka River (Quebec, Canada) water resources system

    International Nuclear Information System (INIS)

    Minville, M.; Krau, S.; Brissette, F.; Leconte, R.

    2008-01-01

    This study investigated the influence of climatic change on the Peribonka water resources system. The impacts of climatic change on hydroelectric power reservoir operations in the region were assessed using a set of operating rules optimized for future hydrological regimes. Thirty climate change projections from 5 climate models, 2 greenhouse gas (GHG) scenarios, and 3 temporal horizons were used in the study. Climatic change projections were then downscaled using the Delta approach and coupled to a stochastic weather generator developed to account for natural variabilities in local climates. A lumped hydrological model was used to simulate future hydrological regimes. A stochastic dynamic programming technique was then used to optimize reservoir operating rules for various time series of future river flows. The operating rules were then used in conjunction with a river system simulation tool in order to determine reservoir and hydroelectric production scenarios under different climatic change regimes. Results of the study showed significant increases in hydroelectricity production for most of the climate change projections. However, nonproductive spillage was also increased. Reservoir reliability was also reduced. tabs., figs

  13. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities -- 1995. Annual report 1995

    International Nuclear Information System (INIS)

    Martinson, R.D.; Graves, R.J.; Langeslay, M.J.; Killins, S.D.

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams

  14. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    challenging problem of optimizing a sequence of two hydro dams sharing the same river system. The complexity of this problem is magnified and we just scratch its surface here. The thesis concludes with suggestions for future work in this fertile area. Keywords: dynamic programming, hydroelectric facility, optimization, optimal control, switching cost, turbine efficiency.

  15. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  16. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  17. More dams planned for Nitassinan Rivers : Innu Nation backgrounder on the proposed Churchill River hydro projects

    International Nuclear Information System (INIS)

    1999-01-01

    The Labrador Innu have expressed their concerns regarding the proposed development of a huge hydroelectric project for the Nitassinan Rivers. The Innu people were not consulted regarding the negotiations which will take place between Newfoundland and Quebec. The biggest concern of the Innu people is the cumulative environmental and social effects of the proposed development and how it will contribute to opening up their territory to further development. For example, access roads, transmission corridors and large-scale clear-cut forestry operations would all impact on their traditional way of life. This paper also described the impacts that the Innu have already experienced as a result of hydroelectric development on the Nitassinan Rivers during the 1970s, when the government of Newfoundland gave the rights to develop and exploit water resources, forests and minerals to a private company. At that time, large areas of hunting and trapping territories were flooded, belongings were lost and burial sites were flooded. The flooding also resulted in increased levels of methyl mercury in fish in the reservoirs as well as downstream. The losses suffered by the Innu people have yet to be addressed by the governments

  18. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  19. Active tectonics and Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (NW Himalaya, India)

    Science.gov (United States)

    Draganits, Erich; Grasemann, Bernhard; Gier, Susanne; Hofmann, Christa-Charlotte; Janda, Christoph; Bookhagen, Bodo; Preh, Alexander

    2015-04-01

    The Baspa River is one of the most important tributaries to the Sutlej River in the NW Himalaya (India). Its catchment is 1116 km2 in size, ranges from c. 6400 m asl to 1770 m asl and contains India's largest private hydroelectric facility, the 300 MW Baspa II. Geologically, the hydroelectric installation is located in the Higher Himalayan Crystalline, just above the active Karcham Normal Fault, which is reactivating the Early Miocene Main Central Thrust, one of the principal Himalayan faults. The area is seismically active and mass-movements are common. Around 8200 yrs BP the Baspa was dammed by a rock-avalanche dam, leading to the formation of the originally c. 260 m deep palaeo-lake Sangla palaeo-lake. Detailed sedimentological investigations and radiocarbon dating indicate that the palaeo-lake was completely filled with sediments until c. 5100 yrs BP. This makes the Sangla palaeo-lake to a very rare example of a mass-movement dam with very long duration and its lacustrine sediments represent a valuable archive for geological processes and environmental proxies within the Baspa catchment during the c. 3100 years of its existence - which are the aim of our study. At least 5 levels of soft-sediment deformation have been recorded in the exposed part of the lacustrine sediments of Sangla palaeo-lake, including brecciated laminae, overturned laminae, folds, faults and deformation bands, separated by undeformed deposits. They are interpreted as seismites, indicating at least 5 earthquakes within 2500 years strong enough to cause liquefaction. The 300 MW Baspa II hydro-electric power plant has been built exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. This data show that the Mid-Holocene erosion rates of the

  20. THE DYNAMIC OF USING THE RIVERS ENERGY FROM REPUBLIC OF MOLDOVA TERRITORY

    Directory of Open Access Journals (Sweden)

    DIANA BRAGA

    2011-03-01

    Full Text Available The dynamic of using the rivers energy from Republic of Moldova territory. One of the least explored and tapped energy sources in Moldova are the inland rivers. Considering the critical condition of the country regarding energy sources, it would be highly necessary to study the feasibility of hydraulic energy reserves. Although Moldova has no major rivers with a large flow of water, the network of small tributaries of its two large rivers, Dniester and Prut, could be used to a certain extent for partial power supply to villages situated along inland watercourses.The first scientific developments concerning the hydropower potential of the rivers in Bessarabia belong to professor D. Pavel. Around 1933 he was suggesting a series of hydro-technical facilities on Prut and Dniester rivers and their tributaries. Subsequently, in the ‘40s of the 20th century the first power plants were built on small rivers. After World War II some small hydropower plants, built during the interwar period, had been restored and some other put into operation. These include the plant at Dubăsari with a capacity of 48 MW that started operating in 1954 on Dniester River, and the hydroelectric complex at Costeşti -Stânca with a capacity of 16 MW, in 1978 on the River Prut. Nevertheless, the leverage of hydroelectric resources is not significant, only 23 being used nowadays, which is 7% of the hydropower potential - a rather modest number compared to other states.

  1. Hydroelectric production from Brazil's São Francisco River could cease due to climate change and inter-annual variability.

    Science.gov (United States)

    de Jong, Pieter; Tanajura, Clemente Augusto Souza; Sánchez, Antonio Santos; Dargaville, Roger; Kiperstok, Asher; Torres, Ednildo Andrade

    2018-09-01

    By the end of this century higher temperatures and significantly reduced rainfall are projected for the Brazilian North and Northeast (NE) regions due to Global Warming. This study examines the impact of these long-term rainfall changes on the Brazilian Northeast's hydroelectric production. Various studies that use different IPCC models are examined in order to determine the average rainfall reduction by the year 2100 in comparison to baseline data from the end of the 20th century. It was found that average annual rainfall in the NE region could decrease by approximately 25-50% depending on the emissions scenario. Analysis of historical rainfall data in the São Francisco basin during the last 57years already shows a decline of more than 25% from the 1961-90 long-term average. Moreover, average annual rainfall in the basin has been below its long-term average every year bar one since 1992. If this declining trend continues, rainfall reduction in the basin could be even more severe than the most pessimistic model projections. That is, the marked drop in average rainfall projected for 2100, based on the IPCC high emissions scenario, could actually eventuate before 2050. Due to the elasticity factor between rainfall and streamflow and because of increased amounts of irrigation in the São Francisco basin, the reduction in the NE's average hydroelectric production in the coming decades could be double the predicted decline in rainfall. Conversely, it is estimated that wind power potential in the Brazilian NE will increase substantially by 2100. Therefore both wind and solar power will need to be significantly exploited in order for the NE region to sustainably replace lost hydroelectric production. Copyright © 2018 Elsevier B.V. All rights reserved.

  2. Hydropower in Hawaii: Developing the Wailuku River project

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    When the 10-MW Wailuku River Hydroelectric Project begins operating this summer, the island of Hawaii will reduce its dependence on oil. The project is illustrative of what must be done to add to the electricity supply and, at the same time, to protect the environment. The Wailuku project is the first hydro plant to be developed in Hawaii in more than 50 years and is the largest hydro facility ever built in the state. The project is being developed by Wailuku River Hydroelectric Power Co., a wholly owned subsidiary of Synergics, Inc. Hawaii Electric Light Company Inc. (HELCO) will buy the electricity generated at the project for 30 years on an as-delivered basis at its avoided cost rate, now approximately 6.71 cents per kilowatt-hour, the floor rate in the contract. The Wailuku endeavor receives rave reviews form the mayor of Hilo, the president of the utility, and local residents. The project demanded a high degree of sensitivity to environmental issues and the uniqueness of the Hawaiian culture and island setting, according to Wayne Rogers, president of Wailuku River Hydro. From the conception of this project, we have worked closely with state and local interests and have been committed to following Hawaii's plans for land use and environmentally responsible energy development

  3. Pasvik River Watercourse, Barents Region: Pollution Impacts and Ecological Responses. Investigations in 1993

    Energy Technology Data Exchange (ETDEWEB)

    Traaen, T; Moiseenko, T; Sandimirov, S and others

    1994-12-31

    The Pasvik River is one of the largest rivers in the Northern Fennoscandia and constitutes the border between Norway and Russia, with catchment area in Finland, Norway and Russia. Besides being strongly regulated for hydroelectric power production, the river is polluted by the smelter in Nikel and other industrial activities and by domestic sewage from the settlements on both sides of the border. This document discusses the pollution of the river and the ecological responses. The two main areas of concern are heavy metals and eutrophication. Very high content of heavy metals in water, lake sediments, macrophytes and fish was found in Kuetsyarvi. Extensive toxic effects were documented on the fish population in the lake. The toxic effects are less than expected from the concentration of heavy metals, which is due to high calcium content, organic matter and eutrophication. Eutrophication is due to the domestic sewage from settlements within the water catchment. Kuetsyarvi has eutrophic status, the lower parts of the Pasvik River have oligo-mesotrophic status according to phosphorus concentrations, and the composition of the planktonic and benthic communities. Because of increased and stabilized water level from hydroelectric power regulations, increased abundance of macrophytes and zoobenthos in shallow areas also have occurred. 77 refs., 32 figs., 28 tabs.

  4. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  5. Methane emission and oxygen consumption in the hydroelectric dam of Petit Saut in French Guyana

    International Nuclear Information System (INIS)

    Galy-Lacaux, C.; Jambert, C.; Delmas, R.; Dumestre, J.F.; Labroue, L.; Cerdan, P.; Richard, S.

    1996-01-01

    Methane emissions from the hydroelectric dam of Petit-Saut, in French Guyana, were measured over a 20-months period. Since the beginning of the reservoir filling (January 1994), 300 km 2 of tropical forest have been submerged. Biological CH 4 oxidation, in the surface water of the lake and in the river downstream of the dam, lead to an intense 0 2 consumption. Emissions of CH 4 by diffusion into the atmosphere or by degassing of the water released into the river as well as the stock of dissolved gas in the lake, and their temporal dynamics, were studied. Maximum emissions of 700 t (CH 4 ) per day were attained in February 1994, corresponding to maximum dissolved CH 4 concentrations of 14 mg l -1 in the water column. Total emissions since January 1994, were calculated from the whole data set. (authors). 7 refs., 2 figs., 1 tab

  6. Hydroelectricity: an asset for a successful energy transition in France

    International Nuclear Information System (INIS)

    Galland, J.C.; Vincent, E.

    2013-01-01

    France's national debate on energy transition has served as a reminder that hydroelectric power plays a significant role in French electricity production. With installed power totalling 25400 MW at end 2012 (the second largest in Europe), France's hydroelectric plants produced 63.8 TWh last year (the third largest in Europe), almost 12% of total output. It is France's second largest means of producing electricity and it represents more than 80% of production of renewable energy. A source of energy developed a long time ago, thus benefiting from technological maturity, hydroelectricity can be produced in large quantity at the heart of France's regions, while also rendering indispensable service for the equilibrium of the French electricity system by compensating the intermittency of other renewable energy sources. The production costs of hydroelectric power are the lowest among all power generation technologies. (authors)

  7. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  8. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    the west region of Cameroon. KEYWORDS: Problems, micro hydroelectric, funds, craftsmen, Cameroon. INTRODUCTION. Energy from Water streaming down the mountains has been exploited since antiquity to replace muscular effort (Bessac, 2000). The perfection of devices used results today in hydroelectric turbines,.

  9. Environment and hydroelectricity colloquium - Synthesis; Colloque Environnement et Hydro-electricite - Synthese

    Energy Technology Data Exchange (ETDEWEB)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-15

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  10. Long-term changes to flood conditions due to varying management strategies, Rock River, WI

    Science.gov (United States)

    Fredrick, K. C.

    2015-12-01

    The Rock River is a 300-mile tributary of the Mississippi River in southern Wisconsin. Its source is a protected migratory bird habitat called the Horicon National Wildlife Refuge. Below the refuge, the Rock River flows through mostly rural, agricultural areas, with wide floodplain of mixed land use. Between the dam at Horicon and a hydroelectric dam in Watertown, WI, lie the townships of Lebanon, Ashippun, and Ixonia. These rural townships boast productive agricultural lands of mostly corn, soybeans, and alfalfa. Large portions of their land are within the floodplain, underlain by vast expanses of outwash sands and gravels, glaciolacustrine deposits, and tills. Throughout the region, spring floods are common from snowmelt and spring rain. These annual floods may be exacerbated by frozen ground and slow infiltration, making it an accepted part of life for residents. Over the last 8 years, and possibly as many as 20, this segment of the Rock River has seen an increase in flooding both in periodicity and retention of flood waters. Due to the delicate habitat of the wildlife refuge and the commissioned hydroelectric installation at the upper dam in Watertown, the residents and local governments of the Lebanon/Ashippun/Ixonia segment of the river have mostly been left to their own devices to monitor and manage flood events. Lebanon Township has been recording water levels for several years. Recent events at the hydroelectric plant seem to indicate that it may be playing a more important role in the flooding. High water events and flood retention do not correlate well with precipitation for the region. It appears that releases at the dam, or periods of water retention, are driving the long flooding periods upstream. Negative impacts to the region from the flooding include property damage, loss of arable land, and environmental effects.

  11. 75 FR 4058 - CRD Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Science.gov (United States)

    2010-01-26

    ... Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: CRD Hydroelectric, LLC. e. Name of Project: Red Rock Hydroelectric Project. f. Location: On the...

  12. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests November 12, 2010. Take notice that the following hydroelectric application has been... Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on...

  13. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  14. Environmental consequences of hydroelectric development: the role of facility size and type

    International Nuclear Information System (INIS)

    Gleick, P.H.

    1992-01-01

    The development of hydroelectric power throughout the world is receiving renewed attention as the economic, political, and environmental costs of conventional energy production rise. There is currently a perception that hydroelectricity has environmental and economic advantages over electricity produced by conventional energy technologies, but there is a paucity of information about the environmental impacts of hydroelectric facilities as a function of size and type. We characterize the environmental impacts of hydroelectric developments and quantify these impacts as a function of the size and type of project. Several unexpected conclusions arise from our analysis. For most hydroelectric facilities, size, as measured by installed capacity, is not necessarily a good indicator or the severity of environmental costs. For impacts such as land flooded and evaporative water lost, smaller facilities cause greater environmental disruptions per unit of energy produced than do larger facilities. (Author)

  15. 76 FR 46793 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-08-03

    ... Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment In accordance with the... for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the Pound..., NE., Room 1-A, Washington, DC 20426. Please affix ``Flannagan Hydroelectric Project No. 12740-003...

  16. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  17. Impact on the aquatic environment of hydro-peaking in hydroelectric plants

    International Nuclear Information System (INIS)

    Sabaton, C.; Lauters, F.; Valentin, S.

    1996-01-01

    There are a number of types of hydroelectric installations on French rivers. Some of these intermittently turbine water stored in dammed reservoirs, in order to use available reserves at the most opportune moment for power generation. These plants, run under 'hydro-peaking' management procedures, cause variations in discharge in river sections downstream of the restitution, on a daily or weekly scale. To answer questions concerning the impact of such variations in discharge on the aquatic environment, EDF launched a research program aimed at describing and better understanding the physical and biological phenomena related to hydro-peaking and assessing the possible impact of this type of plant management on French streams. Seven sites subjects to hydro-peaking were studied on rivers with mean flow rates lower than 20 m 3 /s (which corresponds to over 65 % of EDF hydro-peaking sites). Four themes in particular were examined: hydraulic characterization of hydro-peaking, modifications in thermal regime and water quality, response of benthic invertebrates and response of fish populations to hydro-peaking. For fish as well as for invertebrates, the role of the base discharge - in the absence of peaking flow - and that of the morphology of the river bed (and, in particular, the presence of shelter for fish) during periods of strong discharge were clearly highlighted. Impact assessment requires a precise diagnosis of the state of biocenoses. To carry out such a diagnosis, one must reason in terms of species, life phase (particularly the most sensitive phases) and population structure as well as the type of stream and the faunizone involved. A risk assessment is possible by means of simultaneous study of the morphology of the river bed and the response of the signal generated by hydro-peaking in terms of hydrology and physical characteristics downstream of the restitution. (authors)

  18. Concession renewal of Kembs' hydroelectric head on the Rhine river

    International Nuclear Information System (INIS)

    Baron, P.; Defoug, H.; Petit, D.

    2000-07-01

    In order to evaluate the different impacts of the concession renewal of Kembs' water head on the Rhine river, all aspects have been considered and are reported in this document: international aspects, influence of the dam on navigation and floods, hydrology of Alsace plain, ecological, energetic and economical aspects, leisure and safety aspects. Several questions have to be put forward which concern the transfrontier relations, the water rights, the problem of derivations, of Rhine river maintenance, the turbine and water depth warranty problems, the flow rate and the restoration of the Rhine island. All these questions must be tackled by the impact study. The implementation of a local procedure follow up made of a permanent technical working group and of a management committee is recommended. (J.S.)

  19. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  20. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  1. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Science.gov (United States)

    Finer, Matt; Jenkins, Clinton N

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  2. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Directory of Open Access Journals (Sweden)

    Matt Finer

    Full Text Available Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1 There is a critical need for further strategic regional and basin scale evaluation of dams. 2 There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3 Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  3. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  4. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  5. West Kootenay Power Ltd. : Application to sell its hydroelectric generation assets : Decision

    International Nuclear Information System (INIS)

    Ostergaard, P.; Bradley, P.G.; Clemenhagen, B.L.

    2001-01-01

    An investor-owned electric utility providing wholesale and retail service in the West Kootenay and South Okanagan regions of British Columbia, West Kootenay Power Ltd. (WKP) sought the approval from the British Columbia Utilities Commission to sell the four hydroelectric power plants and related facilities to Kootenay River Power Corporation (KRP), and for the purchase by WKP of the output of these plants under a 60-year power purchase agreement. The four hydroelectric plants have a combined rated capacity of approximately 214 MW. Most of the energy and capacity needs of WKP are met via power purchase contracts and agreements, as winter peak loads approach 700 MW. As a result of share purchases, KRP would be 50 per cent owned by each of a provincial Crown Corporation, Columbia Power Corporation (CPC) and a wholly-owned subsidiary of the Columbia Basin Trust (CBT), CBT Energy Inc., if the transactions are allowed to proceed. Three principal agreements are of interest: the Asset Transfer Agreement (ATA), the Share Purchase Agreement (SPA), and the Power Purchase Agreement (PPA). During the review process, two main issues warranted special consideration: the treatment of the proceeds of the sale of assets, and the statutory parameters used by the Commission for the adjudication of the Application. The Application was submitted March 22, 2001, and the public hearing process began May 29, 2001. This Application is unique, in that it contains three agreements that would each require a separate review, but WKP requested that the agreements be considered in their aggregate. The Commission complied, and decided to deny the Application. Unless the terms of the sale are restructured, the transfer of assets to Kootenay River Power Corporation will not be approved by the Commission. Within one month of the date of this decision, WKP is to notify the Commission of its intentions, since it had signified that it would not proceed with the sale unless WKP shareholder receives 100

  6. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Science.gov (United States)

    2012-07-17

    ...-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a... licenses for the proposed Uniontown Hydroelectric Project and Newburgh Hydroelectric Project. The...

  7. 75 FR 38800 - Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis...

    Science.gov (United States)

    2010-07-06

    ... Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis and Soliciting... following hydroelectric application has been filed with the Commission and is available for public... 13, 2009. d. Applicant: Jordan Hydroelectric Limited Partnership. e. Name of Project: Flannagan...

  8. Testing of an acoustic smolt deflection system, Blantyre hydroelectric power scheme

    International Nuclear Information System (INIS)

    1996-01-01

    The aim of this study was to test the effectiveness of an underwater acoustic barrier as a means of preventing the entry of salmon (Salmo salar) and sea trout (Salmo trutta) smolts and other fish into the water intake of a hydro-electric power (HEP) station. A secondary objective was to measure the injury rate of fish passed through the turbine, so that the risk to any fish that penetrated the acoustic barrier could also be determined. The test site, which was a 575kW Kaplan plant located at Blantyre on the R. Clyde, Lanarkshire, was selected as being representative of run-of-river sites currently being developed under the Government's NFFO (Non-Fossil Fuel Obligation) and SRO (Scottish Renewables Order) schemes. A further objective was to disseminate information arising from the project to the scientific and HEP community. (author)

  9. The Use of Advanced Hydroelectric Turbines to Improve Water Quality and Fish Populations

    International Nuclear Information System (INIS)

    Brookshier, P.A.; Cada, G.F.; Flynn, J.V.; Rinehart, B.N.; Sale, M.J.; Sommers, G.L.

    1999-01-01

    Hydroelectric power contributes about 10 percent of the electrical energy generated in the United States, and nearly 20 percent of the worlds electrical energy. It is a renewable energy source that can contribute significantly to reduction of greenhouse gases by offsetting conventional carbon-based electricity generation. However, rather than growing in importance, hydroelectric generation has actually declined in recent years, often as a consequence of environmental concerns centering around (1) restriction of upstream and downstream fish passage by the dam, and (2) alteration of water quality and river flows by the impoundment. The Advanced Hydropower Turbine System (AHTS) Program of the U.S. Department of Energy is developing turbine technology which would help to maximize global hydropower resources while minimizing adverse environmental effects. Major technical goals for the Program are (1) the reduction of mortality among turbine-passed fish to 2 percent or less, compared to current levels ranging up to 30 percent or greater; and (2) development of aerating turbines that would ensure that water discharged from reservoirs has a dissolved oxygen concentration of at least 6 mg/L. These advanced, environmentally friendly turbines would be suitable both for new hydropower installations and for retrofitting at existing dams. Several new turbine designs that have been developed in the initial phases of the AHTS program are described

  10. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions May 26, 2010. Take notice that the following hydroelectric application and applicant-prepared..., 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  11. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  12. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  13. 75 FR 63450 - Wilkesboro Hydroelectric Company; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-10-15

    ... Hydroelectric Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  14. Hydroelectric power is green, although controversial

    International Nuclear Information System (INIS)

    Schulp, A.

    2003-01-01

    Hydroelectric power is worldwide the most important source of renewable energy. Still, it has some controversial aspects, which are briefly discussed in this article, focusing on Belgium and the Netherlands [nl

  15. THE HYDROENERGETIC POTENTIAL OF THE PRUT RIVER –MOLDOVA REPUBLIC

    Directory of Open Access Journals (Sweden)

    P. PLEŞCA

    2016-03-01

    Full Text Available On the basis of studying of water funds, of the regimes and characteristics of flow of the Prut, of those internal larger and smaller ones, taking into consideration what basins exist and the ones with perspective can demonstrate the hydroenergetical potential values of Republic of Moldova for the current time and on long-time period. The basic variant of the scheme of arrangement on the Prut on the basis of the requirements of today’s impact with the environment, the ecologic flows, hydroenergetical equipments chosen for the parameters of sufficient operation, and the hidrotehnical unit must have an appearance of a complex utilization. The assurances of the flows and head of the hydro-electric plants with operation in cascade on rivers is caused by the strength of the given data and the hydrologic calculations after interstate normatives applied now. Suggested scheme foresees to build dozens of hydro-electric plants with small head on the Prut from which an unit functions as the minimum on the ecologic flow. The potential of the basins of existing accumulation on little rivers must be capitalized first because it requires only the power equipment. Prof. D. Pavel proposed some schemes with the arrangement of MCHE on the rivers Prut, Răut, Bîc.

  16. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  17. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-13

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. Scooteney Wasteway Hydroelectric Project, to be located on the P.E...

  18. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-01-05

    ... Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of... Utility District No. 1 of Okanogan County. e. Name of Project: Enloe Hydroelectric Project. f. Location...

  19. Sedimentary Records of Hyperpycnal Flows and the Influence of River Damming on Sediment Dynamics of Estuaries: Examples from the Nelson, Churchill, Moisie and Sainte-Marguerite Rivers (Canada)

    Science.gov (United States)

    St-Onge, G.; Duboc, Q.; Boyer-Villemaire, U.; Lajeunesse, P.; Bernatchez, P.

    2015-12-01

    Sediment cores were sampled in the estuary of the Nelson and Churchill Rivers in western Hudson Bay, as well as in the estuary of the Moisie and Sainte-Marguerite Rivers in Gulf of St. Lawrence in order to evaluate the impact of hydroelectric dams on the sedimentary regime of these estuaries. The gravity cores at the mouth of the Nelson River recorded several cm-thick rapidly deposited layers with a reverse to normal grading sequence, indicating the occurrence of hyperpycnal flows generated by major floods during the last few centuries. These hyperpycnal flows were probably caused by ice-jam formation, which can increase both the flow and the sediment concentration following the breaching of such natural dams. Following the construction of hydroelectric dams since the 1960s, the regulation of river discharge prevented the formation of hyperpycnal flows, and hence the deposition of hyperpycnites in the upper part of the cores. In the core sampled in the estuary of the Churchill River, only one hyperpycnite was recorded. This lower frequency may be due to the enclosed estuary of the Churchill River, its weaker discharge and the more distal location of the coring site.In the Gulf of St. Lawrence, grain size measurements allowed the identification of a major flood around AD 1844±4 years in box cores from both the Sainte-Marguerite and Moisie Rivers, whereas a drastic decrease in variations in the median grain size occurred around AD ~1900 in the estuary of the Sainte-Marguerite River, highlighting the offshore impact of the SM1 dam construction in the early 1900s. Furthermore, sedimentological variations in the box cores from both estuaries have been investigated by wavelet analysis and the sharp disappearance of high frequencies around AD 1900 in the estuary of the dammed river (Sainte-Marguerite River), but not in the estuary of the natural river (Moisie River), also provides evidence of the influence of dams on the sedimentary regime of estuaries.

  20. Canadian Environmental Assessment Act - comprehensive study report: new Grand-Mere hydroelectric facility proposed by Hydro-Quebec

    International Nuclear Information System (INIS)

    1999-06-01

    A description is given of the hydroelectric construction project as well as the environment surrounding it, the outcome of consultations with interest parties in the public, the overall environmental impacts and cumulative impacts with associated problems that may occur in carrying out the project, attempts at project and environmental mitigation, measuring the importance of the cumulative and environmental effects, conditions for project acceptance, and the overall acceptance of the project or its rejection. The older hydroelectric project was constructed in the post-1910 period and being out of date is experiencing operational problems. There are four problem areas that are important including a need for major repairs to the turbine-generators, lack of flexibility and low electrical capacity that affect the working of the sending-end substation, a state of deterioration affecting operation of the spillways concrete structure, and a bottleneck problem on the Saint-Maurice river caused by the low flow design of the Grand-Mere power station in comparison with that of the Saint-Maurice station. Considering economical, social and environmental factors, of the three options of abandoning the site, upgrading the existing site or constructing a new one, the third option is the preferred one, a conclusion based on considering the out of date state of Grand-Mere facilities and the bottleneck flow condition created on the Saint-Maurice river by the older station. Given the proposed efforts at mitigation, and the follow-up operations stated by the third option advocate, the Department of Fisheries and Oceans is of the opinion that the proposed plans will not affect the environment in an adverse manner. 7 refs

  1. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  2. 75 FR 6371 - Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2010-02-09

    ... Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests February 2, 2010. Take notice that the following hydroelectric application has been filed... License b. Project No.: P-12740-003 c. Date filed: July 13, 2009 d. Applicant: Jordan Hydroelectric...

  3. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  4. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  5. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-10

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. 46A Wasteway Hydroelectric Project, to be located on the P.E. 46A...

  6. Assessment of spermatogenesis and plasma sex steroids in a seasonal breeding teleost: a comparative study in an area of influence of a tributary, downstream from a hydroelectric power dam, Brazil.

    Science.gov (United States)

    Domingos, Fabricio F T; Thomé, Ralph G; Arantes, Fabio P; Castro, Antonio Carlos S; Sato, Yoshimi; Bazzoli, Nilo; Rizzo, Elizete

    2012-12-01

    River damming and building of hydroelectric power plants interrupt the reproductive migration routes and change the major physicochemical parameters of water quality, with drastic consequences for populations of migratory fishes. The goal of this study was to evaluate proliferation and cell death during spermatogenesis and serum profiles of sex steroids in Prochilodus argenteus, from the São Francisco River, downstream from the Três Marias Dam. A total of 257 adult males were caught quarterly during a reproductive cycle in two sites: the first 34 km of the river after the dam (site 1) and the second 34-54 km after the dam (site 2), after the confluence with a tributary, the Abaeté River. Seasonal changes in the testicular activity associated with morphometric analyses of germ cells as well as proliferation and testicular apoptosis support a more active spermatogenesis in fish from site 2, where higher levels of sex steroids and gonadosomatic index (GSI) were also found. In site 1, fish presented low serum levels of testosterone, 17β-estradiol and 17α-hydroxyprogesterone and a low GSI during gonadal maturation. Spermatogonial proliferation (PCNA) and apoptosis (TUNEL) were more elevated in fish from site 1, but spermatocytes were mainly labelled in fish from site 2. Overall, these data demonstrate changes in testicular activity and plasma sex steroids in a neotropical teleost fish living downstream from a hydroelectric dam, supplying new data on fish reproduction in regulated rivers. Moreover, morphometric analyses associated with sex steroids profiles provide reliable tools to assess fish spermatogenesis under environmental stress conditions.

  7. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  8. Central hydroelectric of Santa Ana

    International Nuclear Information System (INIS)

    Pardo A, German

    2000-01-01

    The paper is related to the construction of an alternating tunnel of conduction to take advantage of the available hydraulic load among the Wiesner Plant and Santa Ana's tanks and of Suba, works required to build a hydroelectric power station with a generation capacity of approximately of 12 MW

  9. Holocene versus modern catchment erosion rates at 300 MW Baspa II hydroelectric power plant (India, NW Himalaya)

    Science.gov (United States)

    Draganits, Erich; Gier, Susanne; Hofmann, Christa-Ch.; Janda, Christoph; Bookhagen, Bodo; Grasemann, Bernhard

    2014-08-01

    300 MW Baspa II is India's largest private hydroelectric facility, located at the Baspa River which is an important left-hand tributary to the Sutlej River in the NW Himalaya (India). In this valley the Sangla palaeo-lake has been dammed around 8200 yr BP behind a rock-avalanche dam and Baspa II is located exactly on top of this palaeo-lake. This special location represents a very rare possibility to evaluate the short-term, river load and hydrological parameters measured during the planning and operational stages of Baspa II with the long-term parameters gained from the palaeo-lake sediments from the catchment. Sedimentological and geomorphological investigations of the lacustrine sediments have been used to reconstruct environmental changes during >2500 years of its existence. The Mid-Holocene erosion rates of the Baspa catchment estimated from the volume and duration of deposition of the exposed lake sediments are at 0.7-1.0 mm yr-1, almost identical with the modern erosion rates calculated from river gauge data from Baspa II. Several charcoal layers and charcoal pieces from the uppermost palaeo-lake levels around 5000 cal yr BP might be related to woodland clearance and they possibly represent one of the oldest evidences for human presence in the Baspa Valley during Neolithic time.

  10. Mitigation and recovery of methane emissions from tropical hydroelectric dams

    Energy Technology Data Exchange (ETDEWEB)

    Bambace, L.A.W.; Ramos, F.M.; Lima, I.B.T.; Rosa, R.R. [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos (Brazil)

    2007-06-15

    Tropical hydroelectric reservoirs generally constitute an appreciable source of methane to the atmosphere. This paper proposes simple mitigation and recovery procedures to substantially reduce atmospheric methane emissions from hydroelectric reservoirs. We aim at transforming existing methane stocks of tropical reservoirs into a clean, renewable energy source. The recovered gas methane may be pumped to large consuming centers, stocked locally and burned in gas turbines to generate electricity during high demand periods, or even purified for transport applications. Our simulations show that the use of biogenic methane may increase considerably the energy supply in countries like Brazil. As a result, it would be possible to reduce the need of additional hydroelectric dams, protecting important pristine biomes, and avoiding the resettlement of villages and indigenous reserves. (author)

  11. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  12. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  13. Spatial-temporal dynamics and sources of total Hg in a hydroelectric reservoir in the Western Amazon, Brazil.

    Science.gov (United States)

    Pestana, I A; Bastos, W R; Almeida, M G; de Carvalho, D P; Rezende, C E; Souza, C M M

    2016-05-01

    Damming rivers to construct hydroelectric reservoirs results in a series of impacts on the biogeochemical Hg cycle. For example, modifying the hydrodynamics of a natural watercourse can result in the suspension and transport of Hg deposits in the water column, which represents an exposure risk for biota. The objective of this study was to evaluate the influences of seasonality on the dispersion of total Hg in the Hydroelectric Power Plant (HPP)-Samuel Reservoir (Porto Velho/Brazil). Sampling campaigns were performed during the three following hydrological periods characteristic of the region: low (Oct/2011), ebbing (May/2012), and high (Feb/2013) water. Sediment profiles, suspended particulate matter (SPM), and aquatic macrophytes (Eicchornia crassipes and Oryza spp.) were collected, and their Hg concentrations and isotopic and elemental C and N signatures were determined. The drainage basin significantly influenced the SPM compositions during all the periods, with a small autochthonous influence from the reservoir during the low water. The highest SPM Hg concentrations inside the reservoir were observed during the high water period, suggesting that the hydrodynamics of this environment favor the suspension of fine SPM, which has a higher Hg adsorption capacity. The Hg concentrations in the sediment profiles were ten times lower than those in the SPM, indicating that large particles with low Hg concentrations were deposited to form the bottom sediment. Hg concentrations were higher in aquatic macrophyte roots than in their leaves and appeared to contribute to the formation of SPM during the low water period. In this environment, Hg transport mainly occurs in SPM from the Jamari River drainage basin, which is the primary source of Hg in this environment.

  14. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  15. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  16. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  17. Capturing the Green River -- Multispectral airborne videography to evaluate the environmental impacts of hydropower operations

    International Nuclear Information System (INIS)

    Snider, M.A.; Hayse, J.W.; Hlohowskyj, I.; LaGory, K.E.

    1996-01-01

    The 500-mile long Green River is the largest tributary of the Colorado River. From its origin in the Wind River Range mountains of western Wyoming to its confluence with the Colorado River in southeastern Utah, the Green River is vital to the arid region through which it flows. Large portions of the area remain near-wilderness with the river providing a source of recreation in the form of fishing and rafting, irrigation for farming and ranching, and hydroelectric power. In the late 1950's and early 1960's hydroelectric facilities were built on the river. One of these, Flaming Gorge Dam, is located just south of the Utah-Wyoming border near the town of Dutch John, Utah. Hydropower operations result in hourly and daily fluctuations in the releases of water from the dam that alter the natural stream flow below the dam and affect natural resources in and along the river corridor. In the present study, the authors were interested in evaluating the potential impacts of hydropower operations at Flaming Gorge Dam on the downstream natural resources. Considering the size of the area affected by the daily pattern of water release at the dam as well as the difficult terrain and limited accessibility of many reaches of the river, evaluating these impacts using standard field study methods was virtually impossible. Instead an approach was developed that used multispectral aerial videography to determine changes in the affected parameters at different flows, hydrologic modeling to predict flow conditions for various hydropower operating scenarios, and ecological information on the biological resources of concern to assign impacts

  18. Comparative Research on River Basin Management in the Sagami River Basin (Japan and the Muda River Basin (Malaysia

    Directory of Open Access Journals (Sweden)

    Lay Mei Sim

    2018-05-01

    Full Text Available In the world, river basins often interwoven into two or more states or prefectures and because of that, disputes over water are common. Nevertheless, not all shared river basins are associated with water conflicts. Rivers in Japan and Malaysia play a significant role in regional economic development. They also play a significant role as water sources for industrial, domestic, agricultural, aquaculture, hydroelectric power generation, and the environment. The research aim is to determine the similarities and differences between the Sagami and Muda River Basins in order to have a better understanding of the governance needed for effectively implementing the lessons drawn from the Sagami River Basin for improving the management of the Muda River Basin in Malaysia. This research adopts qualitative and quantitative approaches. Semi-structured interviews were held with the key stakeholders from both basins and show that Japan has endeavored to present policy efforts to accommodate the innovative approaches in the management of their water resources, including the establishment of a river basin council. In Malaysia, there is little or no stakeholder involvement in the Muda River Basin, and the water resource management is not holistic and is not integrated as it should be. Besides that, there is little or no Integrated Resources Water Management, a pre-requisite for sustainable water resources. The results from this comparative study concluded that full support and participation from public stakeholders (meaning the non-government and non-private sector stakeholders is vital for achieving sustainable water use in the Muda River Basin. Integrated Water Resources Management (IWRM approaches such as the introduction of payments for ecosystems services and the development of river basin organization in the Muda River Basin should take place in the spirit of political willingness.

  19. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-08-09

    ... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... Project, FERC No. 9403. All correspondence should be forwarded to Rivermill Hydroelectric, Inc., c/o Essex...

  20. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  1. Hydroelectric power and privatisation

    International Nuclear Information System (INIS)

    Frankovic, B.

    2000-01-01

    The paper considers privatisation aspects of both the existing hydroelectric power plants presently owned by the Croatian state and those to be built in the future. The paper highlights the water power utilisation as just one of the possible purposes of water and land resources development, which are the most important segment of the physical development of the Croatian territory, and the fact that water and land are public wealth. (author)

  2. Effects of Artificial Flooding for Hydroelectric Development on the Population of Mansonia humeralis (Diptera: Culicidae) in the Paraná River, São Paulo, Brazil.

    Science.gov (United States)

    de Paula, Marcia Bicudo; Gomes, Almério de Castro; Natal, Delsio; Duarte, Ana Maria Ribeiro de Castro; Mucci, Luís Filipe

    2012-01-01

    The closure of two phases of the dam at the Porto Primavera Hydroelectric Plant on the Paraná River flooded a flawed system located in the Municipality of Presidente Epitácio, São Paulo state, favoring the proliferation of aquatic weeds. This study aimed to observe the population of Mansonia humeralis in the area, monitoring the richness, diversity, and dominance of this species both before and during different phases of reservoir flooding as well as evaluate its possible consequences concerning human and animal contact. Adult mosquitoes were collected monthly in the following periods: at the original level, after the first flood, and after the maximum level had been reached between 1997 and 2002. Collection methods used were an aspirator, a Shannon trap, and the Human Attractive Technique. A total of 30,723 mosquitoes were collected, Ma. humeralis accounting for 3.1% in the preflood phase, 59.6% in the intermediate, and 53.8% at maximum level. This species is relevant to public health, since the prospect of continued contact between Ma. humeralis and the human population enhances the dam's importance in the production of nuisance mosquitoes, possibly facilitating the transmission of arboviruses. Local authorities should continue to monitor culicid activity through sustainable entomological surveillance.

  3. Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power

    International Nuclear Information System (INIS)

    Caetano de Souza, Antonio Carlos

    2008-01-01

    The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by dams established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible. (author)

  4. The environment and the hydroelectric in Amazonia

    International Nuclear Information System (INIS)

    La Rovere, E.L.

    1992-01-01

    Some aspects about social and environmental impacts due to the hydroelectric power plants constructed in Amazonia region are presented, including considerations of energy planning and management with international example. (C.G.C.)

  5. Climate change impacts on high-elevation hydroelectricity in California

    Science.gov (United States)

    Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.

    2014-03-01

    While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.

  6. Obstacles to hydroelectric power. VDI conference on chances of hydroelectric power - conservation and environmental protection in conflict

    International Nuclear Information System (INIS)

    Sauer, H.D.

    1994-01-01

    Hydroelectric power is one of the most efficient energy sources and presents no CO 2 pollution problem, but there are obstacles as was shown at a VDI conference. Regional landscape conservation interests are in conflict with global environmental protection considerations. (orig.) [de

  7. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC...), proposing to study the feasibility of the Ceresco Hydroelectric Project (Ceresco Project or project) to be...

  8. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  9. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  10. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  11. 75 FR 37790 - Mahoning Creek Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental...

    Science.gov (United States)

    2010-06-30

    ... Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental Assessment for the Proposed Mahoning Creek Hydroelectric Project June 23, 2010. On March 23, 2010, Commission staff issued an Environmental Assessment (EA) for the proposed Mahoning Creek Hydroelectric Project. On April 22, 2010, the U.S...

  12. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  13. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  14. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-04-27

    ... Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests April 20, 2010. Take notice that the following hydroelectric application has been filed with the.... Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...

  15. Snake River Sockeye salmon habitat and limnological research. Annual report 1995

    International Nuclear Information System (INIS)

    Teuscher, D.; Taki, D.

    1996-05-01

    This report contains studies which are part of the Bonneville Power Administration's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Attention is focused on population monitoring studies in the Sawtooth Valley Lakes. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database

  16. Modelling the effects of climate change on streamflow in a sub-basin of the lower Churchill River

    International Nuclear Information System (INIS)

    Pryse-Phillips, Amy; Snelgrove, Ken

    2010-01-01

    Climate change is likely to affect extreme flows as well as average flows. This is an important consideration for hydroelectric power producers. This paper presented the development of an approach to assess the impact of climate changes on seasonal and average annual river flows. The main goal was to investigate how climate change will affect the hydroelectric potential of the Lower Churchill Project using different combinations of emissions scenarios, climate model output and downscaling techniques. The setup and calibration of the numerical hydrological model, WATFLOOD, were performed as preliminary work for the Pinus River basin selected as study basin. Downscaled climate data from the North America change assessment program for both current and future climate periods were analysed. The calibrated model was used to simulate the current and future period streamflow scenarios. The results showed a 13 percent increase in mean annual flows concentrated in the winter and spring seasons.

  17. Modelling the effects of climate change on streamflow in a sub-basin of the lower Churchill River

    Energy Technology Data Exchange (ETDEWEB)

    Pryse-Phillips, Amy [Hatch Ltd., St John' s, (Canada); Snelgrove, Ken [Memorial University of Newfoundland, St John' s, (Canada)

    2010-07-01

    Climate change is likely to affect extreme flows as well as average flows. This is an important consideration for hydroelectric power producers. This paper presented the development of an approach to assess the impact of climate changes on seasonal and average annual river flows. The main goal was to investigate how climate change will affect the hydroelectric potential of the Lower Churchill Project using different combinations of emissions scenarios, climate model output and downscaling techniques. The setup and calibration of the numerical hydrological model, WATFLOOD, were performed as preliminary work for the Pinus River basin selected as study basin. Downscaled climate data from the North America change assessment program for both current and future climate periods were analysed. The calibrated model was used to simulate the current and future period streamflow scenarios. The results showed a 13 percent increase in mean annual flows concentrated in the winter and spring seasons.

  18. Will initiatives to promote hydroelectricity consumption be effective? Evidence from univariate and panel LM unit root tests with structural breaks

    International Nuclear Information System (INIS)

    Lean, Hooi Hooi; Smyth, Russell

    2014-01-01

    This paper examines whether initiatives to promote hydroelectricity consumption are likely to be effective by applying univariate and panel Lagrange Multiplier (LM) unit root tests to hydroelectricity consumption in 55 countries over the period 1965–2011. We find that for the panel, as well as about four-fifths of individual countries, that hydroelectricity consumption is stationary. This result implies that shocks to hydroelectricity consumption in most countries will only result in temporary deviations from the long-run growth path. An important consequence of this finding is that initiatives designed to have permanent positive effects on hydroelectricity consumption, such as large-scale dam construction, are unlikely to be effective in increasing the share of hydroelectricity, relative to consumption of fossil fuels. - Highlights: • Applies unit root tests to hydroelectricity consumption. • Hydroelectricity consumption is stationary. • Shocks to hydroelectricity consumption result in temporary deviations from the long-run growth path

  19. Risks in the operation of hydroelectric power plants and nuclear power in Brazil

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1986-01-01

    A comparison between the utilization of electrical energy generated by hydroelectric power plant and nuclear power plant is made. The risks from nuclear installations and the environmental effects of hydroelectric power plants and nuclear power plants are presented. (E.G.) [pt

  20. Costa Rica: Hydroelectric utility Energía Global finances upstream reforestation

    OpenAIRE

    Energía Global (Global Energy S.A.); The National Forest Office; National Fund for Forest Financing (FONAFIFO)

    2006-01-01

    Metadata only record The goal of Energía Global is to increase both the stream flow and decrease sedimentation in the hydroelectric reservoirs. They are attempting to do this by reforestation projects as well as forest conservation. The sources of revenue for this project are from the private hydroelectric company and the government through taxes on fossil fuels. PES-1 (Payments for Environmental Services Associate Award)

  1. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  2. Fish screens at hydroelectric diversions

    International Nuclear Information System (INIS)

    Ott, R.F.

    1994-01-01

    Preventing downstream migrating fish from entering the turbines at hydroelectric projects is a standard mitigation goal of state and federal fishery management agencies. The object is to minimize the adverse impacts to the fish associated with the exclusion and passage through the bypass water conveyance facilities. In the western United States, most of the fishery management agencies have fish screen design criteria that focus on the approach and transportational velocities, maximum opening dimensions of the screen material, and the cleaning standards. Recently, more attention has been given to fish behavioral traits such as attraction and sustained and darting swimming speed, which has resulted in more attention to the position of the screens to the flow and the length of time the downstream migrants are exposed to the screens. Criteria for length of time of exposure, size and position of bypass, flow and velocities in the bypass entrances, discharge requirements back into the receiving water, and exposure to predation have created unique challenges to the fish screen designer. This paper discusses some of the more recent types of fixed fish screens that are being installed at hydroelectric plants that meet these challenges

  3. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-01-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12576-004] CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment December 23, 2010. In accordance... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No...

  4. Flow management for hydropower extirpates aquatic insects, undermining river food webs

    Science.gov (United States)

    Kennedy, Theodore A.; Muehlbauer, Jeffrey D.; Yackulic, Charles B.; Lytle, D.A.; Miller, S.A.; Dibble, Kimberly L.; Kortenhoeven, Eric W.; Metcalfe, Anya; Baxter, Colden V.

    2016-01-01

    Dams impound the majority of rivers and provide important societal benefits, especially daily water releases that enable on-peak hydroelectricity generation. Such “hydropeaking” is common worldwide, but its downstream impacts remain unclear. We evaluated the response of aquatic insects, a cornerstone of river food webs, to hydropeaking using a life history–hydrodynamic model. Our model predicts that aquatic-insect abundance will depend on a basic life-history trait—adult egg-laying behavior—such that open-water layers will be unaffected by hydropeaking, whereas ecologically important and widespread river-edge layers, such as mayflies, will be extirpated. These predictions are supported by a more-than-2500-sample, citizen-science data set of aquatic insects from the Colorado River in the Grand Canyon and by a survey of insect diversity and hydropeaking intensity across dammed rivers of the Western United States. Our study reveals a hydropeaking-related life history bottleneck that precludes viable populations of many aquatic insects from inhabiting regulated rivers.

  5. Report on the renewal of the hydro-electric concessions

    International Nuclear Information System (INIS)

    2006-11-01

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  6. Incorporating Daily Flood Control Objectives Into a Monthly Stochastic Dynamic Programing Model for a Hydroelectric Complex

    Science.gov (United States)

    Druce, Donald J.

    1990-01-01

    A monthly stochastic dynamic programing model was recently developed and implemented at British Columbia (B.C.) Hydro to provide decision support for short-term energy exports and, if necessary, for flood control on the Peace River in northern British Columbia. The model establishes the marginal cost of supplying energy from the B.C. Hydro system, as well as a monthly operating policy for the G.M. Shrum and Peace Canyon hydroelectric plants and the Williston Lake storage reservoir. A simulation model capable of following the operating policy then determines the probability of refilling Williston Lake and possible spill rates and volumes. Reservoir inflows are input to both models in daily and monthly formats. The results indicate that flood control can be accommodated without sacrificing significant export revenue.

  7. Incorporating daily flood control objectives into a monthly stochastic dynamic programming model for a hydroelectric complex

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D.J. (British Columbia Hydro and Power Authority, Vancouver, British Columbia (Canada))

    1990-01-01

    A monthly stochastic dynamic programing model was recently developed and implemented at British Columbia (B.C.) Hydro to provide decision support for short-term energy exports and, if necessary, for flood control on the Peace River in northern British Columbia. The model established the marginal cost of supplying energy from the B.C. Hydro system, as well as a monthly operating policy for the G.M. Shrum and Peace Canyon hydroelectric plants and the Williston Lake storage reservoir. A simulation model capable of following the operating policy then determines the probability of refilling Williston Lake and possible spill rates and volumes. Reservoir inflows are input to both models in daily and monthly formats. The results indicate that flood control can be accommodated without sacrificing significant export revenue.

  8. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  9. Ticks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.

    Science.gov (United States)

    Labruna, Marcelo B; de Paula, Cátia D; Lima, Thiago F; Sana, Dênis A

    2002-12-01

    From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages) collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  10. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  11. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson... Reclamation, will consider proposals for non-Federal development of hydroelectric power at Granby Dam Outlet of the C-BT, Colorado. Reclamation is considering such hydroelectric power development under a lease...

  12. 76 FR 14651 - BOST4 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2011-03-17

    ... Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the... No.: P-12757-003. c. Date filed: February 24, 2011. d. Applicant: BOST4 Hydroelectric Company, LLC...

  13. 77 FR 785 - BOST5 Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-06

    ... Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12758-003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC...

  14. 76 FR 21885 - BOST5 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2011-04-19

    ... Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the... No.: P-12758-003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC...

  15. 77 FR 786 - BOST4 Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-06

    ... Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12757-003. c. Date filed: February 24, 2011. d. Applicant: BOST4 Hydroelectric Company, LLC...

  16. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  17. Snake River Sockeye Salmon Habitat and Limnological Research; 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Teuscher, David; Taki, Doug [Shoshone-Bannock Tribes, Fort Hall, ID

    1996-05-01

    This report contains studies which are part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Attention is focused on population monitoring studies in the Sawtooth Valley Lakes. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  18. Model documentation report: Short-Term Hydroelectric Generation Model

    International Nuclear Information System (INIS)

    1993-08-01

    The purpose of this report is to define the objectives of the Short- Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the Energy Information Administration's (AYE) legal obligation to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). The STHGM performs a short-term (18 to 27- month) forecast of hydroelectric generation in the United States using an autoregressive integrated moving average (UREMIA) time series model with precipitation as an explanatory variable. The model results are used as input for the short-term Energy Outlook

  19. Production capacity of equipment for medium and large hydroelectric power plant in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang Shenyang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents an overview on the production capacity of equipment for medium and large hydroelectric power plant in China. The document approaches general aspects, production capability and testing facilities related to Francis, Kaplan, tubular and impulse hydroelectric generating sets, and the introduction of main manufacturers as well.

  20. 76 FR 14653 - BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2011-03-17

    ... Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12756-003. c. Date filed: July 26, 2010. d. Applicant: BOST3 Hydroelectric Company, LLC (BOST3...

  1. 75 FR 66077 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Supplemental Environmental...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12555-004-PA] Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Supplemental Environmental Assessment... Energy Projects has reviewed the application for an original license for the Mahoning Creek Hydroelectric...

  2. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  3. Numerical modelling of admixture transport in a turbulent flow at river confluence

    International Nuclear Information System (INIS)

    Lyubimova, T; Parshakova, Ya; Konovalov, V; Shumilova, N; Lepikhin, A; Tiunov, A

    2013-01-01

    The paper is concerned with the development of the hydrodynamic model of the Chusovskoy water intake located in the confluence zone of two rivers with essentially different hydrochemical regimes and in the backwater zone of the Kamskaya hydroelectric power station. The proposed model is used for numerical simulation in the framework of two-and three-dimensional approaches for the annual average, minimal and maximal values of the water flow rates in two rivers. The data for water mineralization in the water intake zone have been obtained. The recommendations for optimization of the water intake structure have been formulated.

  4. Fish resource data from the Snare River, Northwest Territories

    International Nuclear Information System (INIS)

    Jessop, E.F.; Chang-Kue, K.T.J.; MacDonald, G.

    1994-01-01

    An extensive fish sampling and tagging program was conducted on the Snare River, Northwest Territories, in order to collect baseline data on the fish populations in sections of the river altered by hydroelectric projects. Fish populations were sampled from May to July 1977 in five sections of the river that were influenced by development of hydropower at three dams currently on line; 530 tagged fish were also released. The biweekly catch composition in experimental gill nets for each study area and the catch per gill net mesh size are presented for walleye (Stizostedion vitreum), lake trout (Salvelinus namaycush), lake whitefish (Coregonus clupeaformis), lake cisco (Coregonus artedi), northern pike (Esox lucius), white sucker (Catostomus commersoni), and longnose sucker (Catostomus catostomus). Age-specific data on length, weight, age, sex, and maturity are also included. 7 refs., 12 figs., 42 tabs

  5. Influence of environmental variables on diffusive greenhouse gas fluxes at hydroelectric reservoirs in Brazil.

    Science.gov (United States)

    Rogério, J P; Santos, M A; Santos, E O

    2013-11-01

    For almost two decades, studies have been under way in Brazil, showing how hydroelectric reservoirs produce biogenic gases, mainly methane (CH4) and carbon dioxide (CO2), through the organic decomposition of flooded biomass. This somewhat complex phenomenon is due to a set of variables with differing levels of interdependence that directly or indirectly affect greenhouse gas (GHG) emissions. The purpose of this paper is to determine, through a statistical data analysis, the relation between CO2, CH4 diffusive fluxes and environmental variables at the Furnas, Itumbiara and Serra da Mesa hydroelectric reservoirs, located in the Cerrado biome on Brazil's high central plateau. The choice of this region was prompted by its importance in the national context, covering an area of some two million square kilometers, encompassing two major river basins (Paraná and Tocantins-Araguaia), with the largest installed power generation capacity in Brazil, together accounting for around 23% of Brazilian territory. This study shows that CH4 presented a moderate negative correlation between CO2 and depth. Additionally, a moderate positive correlation was noted for pH, water temperature and wind. The CO2 presented a moderate negative correlation for pH, wind speed, water temperature and air temperature. Additionally, a moderate positive correlation was noted for CO2 and water temperature. The complexity of the emission phenomenon is unlikely to occur through a simultaneous understanding of all the factors, due to difficulties in accessing and analyzing all the variables that have real, direct effects on GHG production and emission.

  6. Influence of environmental variables on diffusive greenhouse gas fluxes at hydroelectric reservoirs in Brazil

    Directory of Open Access Journals (Sweden)

    JP. Rogério

    Full Text Available For almost two decades, studies have been under way in Brazil, showing how hydroelectric reservoirs produce biogenic gases, mainly methane (CH4 and carbon dioxide (CO2, through the organic decomposition of flooded biomass. This somewhat complex phenomenon is due to a set of variables with differing levels of interdependence that directly or indirectly affect greenhouse gas (GHG emissions. The purpose of this paper is to determine, through a statistical data analysis, the relation between CO2, CH4 diffusive fluxes and environmental variables at the Furnas, Itumbiara and Serra da Mesa hydroelectric reservoirs, located in the Cerrado biome on Brazil's high central plateau. The choice of this region was prompted by its importance in the national context, covering an area of some two million square kilometers, encompassing two major river basins (Paraná and Tocantins-Araguaia, with the largest installed power generation capacity in Brazil, together accounting for around 23% of Brazilian territory. This study shows that CH4 presented a moderate negative correlation between CO2 and depth. Additionally, a moderate positive correlation was noted for pH, water temperature and wind. The CO2 presented a moderate negative correlation for pH, wind speed, water temperature and air temperature. Additionally, a moderate positive correlation was noted for CO2 and water temperature. The complexity of the emission phenomenon is unlikely to occur through a simultaneous understanding of all the factors, due to difficulties in accessing and analyzing all the variables that have real, direct effects on GHG production and emission.

  7. Nitrogen loading and nitrous oxide emissions from a river with multiple hydroelectric reservoirs.

    Science.gov (United States)

    Chen, Jinsong; Cao, Wenzhi; Cao, Di; Huang, Zheng; Liang, Ying

    2015-05-01

    River networks receive a large fraction of the anthropogenic nitrogen applied to river catchments. The different impacts of the stream nitrogen (N) loading on nitrous oxide (N2O) emissions from various of aquatic ecosystems are still unknown. In this study, direct measurements of water-air interface N2O exchange in different water bodies were conducted. Results showed that the water-air interface N2O exchange from tributaries, hydropower station reservoirs, a main stream, and its estuary were 10.14 ± 13.51, 15.64 ± 10.72, 27.59 ± 20.99, and 15.98 ± 12.26 µg N2O-N m(-2) h(-1), respectively, indicating the strong impacts of human activities on N2O emission rates. The water NO2 (-)-N values predicted the dissolved N2O concentrations better than did the NO3 (-)-N and NH4 (+)-N values, indicating strong denitrification and nitrification processes. The dissolved inorganic N explained 36 % of the variations in the N2O emissions for the whole river network.

  8. Effectiveness of water release as mitigation for hydroelectric impacts to fish

    International Nuclear Information System (INIS)

    Lewis, A.F.; Mitchell, A.C.

    1995-01-01

    Utility companies release water to mitigate the effects of hydroelectric projects on fish habitats. Utility companies, government agencies, and research communities in Canada, the US, Europe, New Zealand, and Australia were surveyed as part of a Canadian Electrical Association study to evaluate the effectiveness of water release as a mitigation. Respondents identified only 28 projects in which water was released specifically to protect fish habitats. Fewer than half of these projects (12) were judged as being effective. Six case histories with preimpact assessment and postimpact monitoring were reviewed. In four cases fish habitat or fish populations or both were maintained; in two cases they were not. The effectiveness of water release differed among rivers and fish species, and was greatest when designed to meet the habitat requirements of each life-history stage. A review of the literature did not support the theory that a particular fraction of the mean annual flow provides the bet fish habitat. Although smaller changes in the flow regime had smaller effects, increasing minimum flows above those historically observed did not necessarily increase fish production

  9. Pingston hydroelectric project - stage 2 project report : volume 1 of 2

    International Nuclear Information System (INIS)

    1999-01-01

    The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices

  10. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  11. improvement of hydroelectric power generation using pumped

    African Journals Online (AJOL)

    HOD

    1, 4 DEPARTMENT OF SYSTEMS ENGINEERING, UNIVERSITY OF LAGOS, AKOKA, YABA, ... pumped storage system for generating hydroelectric power all year round. ... Power supply situation in Nigeria has no doubt ..... (objective functions), criteria for evaluation of control .... adsen H “Para eter esti ation in distributed.

  12. Finland, Sweden and Austria doubled the share of hydroelectric power in EU

    International Nuclear Information System (INIS)

    Kangas, H.

    1996-01-01

    New EU countries Finland, Sweden and Austria increased the amount of hydroelectric power produced in EU in 1995 by more than 50 % compared to the year 1994. Especially Sweden and Austria are very dependent on hydroelectric power; the share of hydroelectric power is in Austria more than 70 % and even in Sweden it was nearly 50 %. The share of hydroelectric power in 1995 the EU region was 14 % of the total power demand. Due to the new EU countries the share of hydroelectric power of the total electric power demand, which would have decreased, increased by over 3 %. The increase of the electric power demand in Finland was lowest in the EU region, about 1.0 %, while it was in Greece 5.0 % and in Spain about 4.6 %. The share of nuclear power in the EU region was about 35 % in 1995. The most nuclear power dependent country in the EU was France there the share of nuclear power of the total electric power demand was 89 %. Both Finland and Sweden increased the production of back-pressure power generation in 1995. The share of back-pressure power generation in EU in 1995 was about 50 TWh which corresponds to some 1.5 % of the total electric power demand. About 50 % of the total electric power generation in EU was produced by condensing power generation. This production increased by 10 % compared to 1994. The netimport of electric power of EU increased by 80 % in Finland and Sweden, which are large importers of electric power outside the EU region

  13. 76 FR 71967 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12740-003-VA] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... application for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the...

  14. 75 FR 15705 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2010-03-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12555-004-PA] Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment March 23, 2010. In... reviewed the application for an original license for the Mahoning Creek Hydroelectric Project, to be...

  15. 77 FR 26537 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2012-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment In accordance with the... the proposed 14,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch...

  16. Diversity and genetic distance in populations of Steindachnerina in the upper Paraná river floodplain of Brazil.

    Science.gov (United States)

    Oliveira, A V; Prioli, A J; Prioli, S M A P; Pavanelli, C S; Júlio, H F; Panarari, R S

    2002-08-01

    Whereas four species of the genus Steindachnerina occur in the Paraná river basin, S. insculpta was the only endemic species of the region under analysis, which is the third lower section of the upper Paraná river. Among other factors, this species has been characterised by the absence of spots in the basal region of the dorsal fin. However, various specimens with this characteristic appeared in the region after the construction of the Itaipu Hydroelectric Plant in 1982. An analysis of the genetic variability of Steindachnerina populations with or without spots is provided. Specimens were collected in different sites of the floodplain of the upper Paraná river and samples were compared by random amplified polymorphic DNA (RAPD) technique and morphological analyses. Ninety-eight amplified loci with nine random primers were analysed in 19 specimens of each phenotype. Data for genetic distance showed great divergences between the two phenotypes and indicate two different species. Spotted specimens may be identified as S. brevipinna, found in the region downstream Sete Quedas Falls. The species must have overcome the geographical barrier during the building of the Itaipu hydroelectric dam that submerged the waterfalls and which became an obstacle between the upper and middle Paraná river some 150 km downstream. Since phenotypes do not share dominant alleles, absence of gene flow has been suggested.

  17. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  18. Effects of river ice on bank morphology and riparian vegetation along Peace River, Clayhurst to Fort Vermilion

    International Nuclear Information System (INIS)

    Uunila, L.S.

    1997-01-01

    The effects of river ice and related flooding on the bank morphology and riparian vegetation along 655 km of the Peace River from Clayhurst, British Columbia to Fort Vermilion, Alberta were studied. The river has been regulated for hydroelectric power generation since 1968 and has experienced changes in the hydrologic and ice regimes. The rate of channel adjustments under the new hydrologic regime vary longitudinally, and depend greatly on the succession of riparian vegetation. This study was conducted to determine how much of the variation in both channel adjustment and rate of riparian succession is a result of allogenic effects of ice jams. The direct physical effects of ice and the indirect effects of ice jam flooding on the channel margin were investigated. Long term ice jam severity was found to generally peak well downstream of the principal observation point. The morphology of the channel at the severe ice jam locations fit the classical ice jam criteria of confined tight meanders with several mid-channel islands and shoals. Vegetation damage was the most visible impact to the riparian environment along the Peace River. 27 refs., 1 tab., 8 figs

  19. Survival Estimates for the Passage of Juvenile Chinook Salmon through Snake River Dams and Reservoirs, 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Iwamoto, Robert N.; Sandford, Benjamin P.; McIntyre, Kenneth W.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers.

  20. Survival estimates for the passage of juvenile chinook salmon through Snake River dams and reservoirs. Annual report 1993

    International Nuclear Information System (INIS)

    Iwamoto, R.N.; Muir, W.D.; Sandford, B.P.; McIntyre, K.W.; Frost, D.A.; Williams, J.G.; Smith, S.G.; Skalski, J.R.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers

  1. Amplification of Marzagao small scale hydroelectric power plant; Ampliacao da PCH de Marzagao

    Energy Technology Data Exchange (ETDEWEB)

    Zeller, A.R.; Porto, D.S.; Pinto, F.S. [Leme Engenharia, MG (Brazil); Melo, A.U.; Almeida, A.M.; Pereira, D.R. [Fertiligas Industria e Comercio Ltda., MG (Brazil)

    1991-12-31

    This work presents the modernization and power augmentation of Marzagao small scale hydroelectric power plant. In order that the costs of the project be compatible to the total of investments in the project, it was necessary the adoption of methodologies and time scales different from those used for large and medium scale hydroelectric power plants 5 figs.

  2. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  3. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  4. Ticks (Acari: Ixodidae on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil

    Directory of Open Access Journals (Sweden)

    Marcelo B Labruna

    2002-12-01

    Full Text Available From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paraná river, between the states of São Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species, Boophilus (1 and Anocentor (1. A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  5. Caxingo - a promising model for integrating the hydroelectric work camps to the site communities

    International Nuclear Information System (INIS)

    Luna, A.M.; Falcao, A.A.

    1989-01-01

    The social and economical impacts caused by the hydroelectric work camps in the sites where the hydroelectric will be constructed are studied, analysing the great supply of works when the hydroelectric is been constructed face to the reduction one when the works are concluded; the neglect by the State in providing medical and educational assistances to the neighbour populations; the appearance of a commerce in the neighbour areas; the employer stableness in the camp after the pension and the lack by the neighbour cities of a social and economical substructure to offer to the population, that come with the hydroelectric construction. A new solution for these problems is presented in the Xingo camp, where the camp will be as a district of city near to the work, with community services provide by the State and the needful substructure to its construction and the equipment provide by the concessionaire. (C.G.C.). 1 fig

  6. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements; Vispassage waterkrachtcentrale Linne. Didson metingen

    Energy Technology Data Exchange (ETDEWEB)

    Van Keeken, O.A.; Griffioen, A.B. [Institute for Marine Resources and Ecosystem Studies IMARES, Wageningen UR, IJmuiden (Netherlands)

    2011-11-15

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [Dutch] Bij de waterkrachtcentrale in de Maas bij Linne is een visafweer- en geleidingssysteem aangelegd. In deze studie werd op twee avonden verdeeld over de maanden augustus en september 2011 gekeken in hoeverre vissen het visgeleidingssysteem benaderden en gebruikten. Voor het vaststellen van het zwemgedrag van de vissen is gebruik gemaakt van de DIDSON, een hoge resolutie sonar waarmee bewegende beelden kunnen worden gemaakt van vis in troebel water om het gedrag te bestuderen.

  7. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  8. Geochemistry of the Upper Parana River floodplain. Study of the Garcas Pond and Patos Pond

    International Nuclear Information System (INIS)

    Marcelo Bevilacqua Remor; Silvio Cesar Sampaio; Marcio Antonio Vilas Boas; Ralpho Rinaldo dos Reis

    2015-01-01

    The aim of this study was to investigate the temporal evolution of the supply of chemical elements to the Upper Parana River floodplain and identify trends in the geochemistry of its drainage basin. The primary factor that regulates the supply of chemical elements of the Upper Parana River floodplain is the flood pulse, which can be magnified by the El Nino-Southern Oscillation. Garcas Pond is affected by agriculture, urbanization, discharge of industrial effluents and hydroelectric power production activities. Patos Pond is affected by sugarcane burning, gold mining, agriculture and urbanization. (author)

  9. Sensitivity of the hydrologic cycle in Tana river basin to climate change

    International Nuclear Information System (INIS)

    Mutua, F.M.

    1998-01-01

    The Tana River basin in Kenya has four distinct climates along it's gradient from cool humid in mount Kenya region through arid and semi arid in the lower plains to semi humid coastal climate. From the highlands of mount Kenya to the plateau on the lowlands, the river traverses some sections which have high potential for hydro-electric power generation. The government has constructed water reovirus to collect water for electricity generation. The influence of the reovirus have also caused climate modification. The aim of the study was to investigate the sensitivity of the river flows in the Tana river to climate change. The study indicates that, as long as temperature increment of up to 2 degrees centigrade are accompanied by positive changes (greater than 10%) in rainfall over the basin, then the hydrologic cycle adjust itself accordingly to give a positive response (increased runoff) in terms of the river at the outlet

  10. Indian areas threatened by hydroelectric projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Aspelin, P L; Santos, S.C. dos

    1981-10-01

    In Brazil, as elsewhere, high priority is being given to developing domestic energy sources due to the spectacular increase in the cost of imported petroleum in recent years. This paper discusses the present situation of the thirty-two to thirty-four various Indian areas presently known to be threatened by seven major hydro-electric projects and one flood-control project, either planned or underway, in or directly involving Brazil. A total of at least 100,000 hectares of Indian land (or nearly one hectare for each remaining Brazilian Indian) will be flooded or otherwise expropriated by these projects. Past efforts by the Brazilian National Indian Foundation (FUNAI) to protect the Indians from the pressure of ''national development'' have not been sufficient. Research, planning, publicity, and political pressure are necessary to ensure that their efforts regarding these hydroelectric projects are more successful.

  11. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  12. Quality of water in the White River and Lake Tapps, Pierce County, Washington, May-December 2010

    Science.gov (United States)

    Embrey, S.S.; Wagner, R.J.; Huffman, R.L.; Vanderpool-Kimura, A. M.; Foreman, J.R.

    2012-01-01

    The White River and Lake Tapps are part of a hydropower system completed in 1911–12. The system begins with a diversion dam on the White River that routes a portion of White River water into the southeastern end of Lake Tapps, which functioned as a storage reservoir for power generation. The stored water passed through the hydroelectric facilities at the northwestern end of the lake and returned to the White River through the powerhouse tailrace. Power generation ceased in January 2004, which altered the hydrology of the system by reducing volumes of water diverted out of the river, stored, and released through the powerhouse. This study conducted from May to December 2010 created a set of baseline data collected under a new flow regime for selected reaches of the White River, the White River Canal (Inflow), Lake Tapps Diversion (Tailrace) at the powerhouse, and Lake Tapps.

  13. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    International Nuclear Information System (INIS)

    Barros, Carlos P.; Peypoch, Nicolas

    2007-01-01

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency

  14. Inventory studies of hydroelectric power plants: the methodological differences for small and large power plants; Estudos de inventario de usinas hidreletricas: as diferencas metodologicas para pequenas e grandes centrais

    Energy Technology Data Exchange (ETDEWEB)

    Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia; Martinez, Carlos Barreira [Faculdade de Engenharia Civil de Itajuba, MG (Brazil)

    1992-12-31

    The hydroelectric potential handbook produced by ELETROBRAS provides procedures to guides the hydro power studies of river sites. In this paper, a critical analysis of these procedures is carried out, for both large and small hydro power plants, pin pointing the plant`s planning/design interface there, several proposals are put forward in the order to adapt these procedures to small hydro plants, optimizing their planning and design for the several situation, found in Brazilian reality. (author) 5 refs.

  15. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  16. Water quality study of Sunter River in Jakarta, Indonesia

    Science.gov (United States)

    Martinus, Y.; Astono, W.; Hendrawan, D.

    2018-01-01

    Sunter River flows in the city of Jakarta with the designation of river water for agricultural purposes, and can be utilized for urban business and hydroelectric power industry. This study aims to determine the Sunter River water quality based on physical and chemical parameters. Water sampling was conducted 2 times which done in April and May with 5 sampling stations for measuring. The samples was analayzed in the laboratory according SNI methods for parameters BOD, COD, PO4 3-, NO3, Oil & Grease and Detergents. The quality status of Sunter River is determined by the Pollutant Index method. The results show that the water quality of Sunter River is influenced by organic parameter as dominant pollutant with COD concentration ranging from 48 mg/l - 182.4 mg/l and BOD concentration ranging from 14.69 mg/L - 98.91 mg/L. The Pollution Index calculation results show that the water quality status of Sunter River is moderate polluted with IP 6.47. The source of pollutants generally comes from the urban drainage channels, tributaries, and slaughtering industry. The results of this study expected to be use by the government to improve the water quality of Sunter River for better environment.

  17. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  18. Report on the development perspectives of the hydroelectric production in France

    International Nuclear Information System (INIS)

    2006-03-01

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  19. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  20. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003 Montana] Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  1. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...

  2. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental Assessment In accordance with... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  3. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Science.gov (United States)

    2011-04-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation of Teleconference On March 15... Mountain Pumped Storage Hydroelectric Project. This meeting has been cancelled. We will reschedule this...

  4. Effect of natural and man-made factors on mineral composition of Ardon river water

    International Nuclear Information System (INIS)

    Tyutikov, S.F.; Ermakov, V.V.; Degtyarev, A.P.; Krechetova, E.V.; Petrunina, N.S.

    2008-01-01

    The data on change of landscapes and biota (plants, algae, amphibious) are submitted as a result of natural catastrophes (mud-stream) and man-made factors (construction of a gas main and hydroelectric power station). It is shown, that the specified factors in some cases change not only structure of landscapes and a chemical compound of natural and industrial waters, but also a character of invasion of organisms. The certain influence of size of suspended matter of Ardon river waters on their general mineralization was discovered. Contents of heavy metals in waters of Ardon river is not critical and is in acceptable hygienic parameters.

  5. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  6. Hydroelectric dams in Amazon as source of GHG

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.; Santos, M.A.

    1996-01-01

    A recent paper by Fearnside points out that hydroelectric development in Amazonia is a significant source of greenhouse gases (GHG) emissions. This conclusion is in contrast to the common belief that hydroelectric dams are better than fossil fuel use in electric power generation, from the view point of GHG emissions. The authors have considered both CH 4 and CO 2 emissions taking into account the instantaneous radiative forcing due to a unit increase in the concentration of gases, the decay times of gases in the atmosphere and the emissions patterns of emissions vary depending on biomass density and type of the forest area flooded, as well as on depth of flooding. As the Fearnside paper is more concerned with CO 2 emissions from the above water biomass, the authors' focus will be restricted to the formulae for calculating the cumulative effect of CO 2

  7. Mercury Contamination in an Indicator Fish Species from Andean Amazonian Rivers Affected by Petroleum Extraction.

    Science.gov (United States)

    Webb, Jena; Coomes, Oliver T; Mainville, Nicolas; Mergler, Donna

    2015-09-01

    Elevated mercury (Hg) concentrations in fish from Amazonia have been associated with gold-mining, hydroelectric dams and deforestation but few studies consider the role of petroleum extraction. Hg levels were determined in fish samples collected in three river basins in Ecuador and Peru with contrasting petroleum exploitation and land-use characteristics. The non-migratory, piscivorous species, Hoplias malabaricus, was used as a bioindicator. The rate of Hg increase with body weight for this species was significantly higher on the Corrientes River, near the site of a recent oil spill, than on the other two rivers. In the absence of substantial deforestation and other anthropogenic sources in the Corrientes River basin, this finding suggests that oil contamination in Andean Amazonia may have a significant impact on Hg levels in fish.

  8. Instream flow needs below peaking hydroelectric projects

    International Nuclear Information System (INIS)

    Milhous, R.T.

    1991-01-01

    This paper reports on a method developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly change streamflow over a short period of time; consequently, any instream flow methodology must consider the dual flows associated with peaking projects. The dual flows are the lowest flow and the maximum generation flow of a peaking cycle. The methodology is based on elements of the Physical Habitat Simulation System of the U.S. Fish and Wildlife Service and uses habitat, rather than fish numbers or biomas, as at basic response variable. All aquatic animals are subject to the rapid changes in streamflow which cause rapid swings in habitat quality. Some aquatic organisms are relatively fixed in location in the stream while others can move when flows change. The habitat available from a project operated in peaking mode is considered to be the minimum habitat occurring during a cycle of habitat change. The methodology takes in to consideration that some aquatic animals can move and others cannot move during a peaking cycle

  9. A CUSUM analysis of discharge patterns by a hydroelectric dam and discussion of potential effects on the upstream migration of American eel elvers

    International Nuclear Information System (INIS)

    Jessop, B.M.; Harvie, C.J.

    2003-01-01

    American eel elvers are among the diadromous fishes native to the Saint John River in New Brunswick that have been affected by the construction of hydroelectric dams. Before 1980, large numbers of elvers were observed entering the fishway of the Mactaquac Dam in May and June for upstream migration, but their presence abruptly ceased after 1980. A study was conducted to determine why they disappeared at the Mactaquac Dam. A cumulative sum (CUSUM) analysis was performed to determine the variability in magnitude, duration, timing, frequency, and rate of change in the daily and seasonal average level of water discharge associated with the installation of the last two of six turbines in late 1979 and early 1980. It is believed that the rapid, short-term fluctuations in water discharge which is characteristic of peaking hydroelectric dam operations, could seriously affect life cycle transitions of diadromous fishes. Upstream and downstream migration of the elvers may be affected along with their abundance, diversity and productivity. Young fish in particular are at higher risk of mortality during high flows, depending on the species. 40 refs., 3 tabs., 10 figs

  10. What are the stakes of the hydroelectric power? Supplement: report on the renewable energies

    International Nuclear Information System (INIS)

    2003-01-01

    The document presents the regulation and the stakes concerning the hydroelectricity development in France: contribution to the greenhouse effect fight, the environment preservation, possible uses. It proposes then, a grid of a socio-economical evaluation of the projects. In this framework, the impacts of the little hydroelectric power and the possible corrective measures are described. (A.L.B.)

  11. Ecologisation of the agricultural Danubian Region on the concrete territory in the part between Danube river-bed and derivation canal

    International Nuclear Information System (INIS)

    Davidova, T.

    1997-01-01

    The construction of the hydroelectric power constructions Gabcikovo changed the landscape near the Danube river. After the construction of the supply and falling-off canals with the hydroelectric power plant the artificial island with three seats were formed. This territory has high ecologic quality with good developed organisation of the bio-centers, bio-corridors and interaction elements with the specifically oriented agriculture. In this territory the development of the socio-economic activities were substantially limited regard to the protection of the water sources, protection of the forests, protected territories of the nature and communication accessibility. Therefore, the centre of the gravity of the territory development must be oriented in the ecology

  12. Documentation of input datasets for the soil-water balance groundwater recharge model of the Upper Colorado River Basin

    Science.gov (United States)

    Tillman, Fred D.

    2015-01-01

    The Colorado River and its tributaries supply water to more than 35 million people in the United States and 3 million people in Mexico, irrigating more than 4.5 million acres of farmland, and generating about 12 billion kilowatt hours of hydroelectric power annually. The Upper Colorado River Basin, encompassing more than 110,000 square miles (mi2), contains the headwaters of the Colorado River (also known as the River) and is an important source of snowmelt runoff to the River. Groundwater discharge also is an important source of water in the River and its tributaries, with estimates ranging from 21 to 58 percent of streamflow in the upper basin. Planning for the sustainable management of the Colorado River in future climates requires an understanding of the Upper Colorado River Basin groundwater system. This report documents input datasets for a Soil-Water Balance groundwater recharge model that was developed for the Upper Colorado River Basin.

  13. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  14. Impact of PETIT-SAUT hydroelectric dam on aquatic life (French Guyana)

    International Nuclear Information System (INIS)

    Sissakian, C.

    1992-01-01

    The construction of the hydroelectric scheme of PETIT-SAUT in French Guyana creates a reservoir which covers 310 km 2 of tropical rain forest. This hydroelectric scheme has an influence on the various aspects of the environment. One of the most important aspects is the modification of the water quality and of the aquatic life due to the degradation of organic matter. Some studies of the biology of these area fishes are initiated. At the same time, Electricite de France studies some constructive arrangements and reservoir managements to assure, the most rapidly possible, a return to an aquatic normal life. 6 refs

  15. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  16. Integrating Disciplines, Sectors, and Societies to Improve the Definition and Implementation of Environmental Flows for Dammed Amazonian Rivers

    Science.gov (United States)

    Kaplan, D. A.; Livino, A.; Arias, M. E.; Crouch, T. D.; Anderson, E.; Marques, E.; Dutka-Gianelli, J.

    2017-12-01

    The Amazon River watershed is the world's largest river basin and provides US$30 billion/yr in ecosystem services to local populations, national societies, and humanity at large. The Amazon is also a relatively untapped source of hydroelectricity for Latin America, and construction of >30 large hydroelectric dams and >170 small dams is currently underway. Hydropower development will have a cascade of physical, ecological, and social effects at local to global scales. While Brazil has well-defined environmental impact assessment and mitigation programs, these efforts often fail to integrate data and knowledge across disciplines, sectors, and societies throughout the dam planning process. Resulting failures of science, policy, and management have had widespread environmental, economic, and social consequences, highlighting the need for an improved theoretical and practical framework for understanding the impacts of Amazon dams and guiding improved management that respects the needs and knowledge of diverse set of stakeholders. We present a conceptual framework that links four central goals: 1) connecting research in different disciplines (interdisciplinarity); 2) incorporating new knowledge into decision making (adaptive management); 3) including perspectives and participation of non-academic participants in knowledge generation (transdisciplinarity); and 4) extending the idea of environmental flows ("how much water does a river need?") to better consider human uses and users through the concept of fluvial anthropology ("how much water does a society need?"). We use this framework to identify opportunities for improved integration strategies within the (Brazilian) hydroelectric power plant planning and implementation "lifecycle." We applied this approach to the contentious Belo Monte dam, where compliance with regulatory requirements, including monitoring for environmental flows, exemplifies the opportunity for applying adaptive management, but also highlights an

  17. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    Since the 1930's, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M ampersand I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M ampersand I studies; Irrigation/M ampersand I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M ampersand I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement

  18. Simulating daily water temperatures of the Klamath River under dam removal and climate change scenarios

    Science.gov (United States)

    Perry, Russell W.; Risley, John C.; Brewer, Scott J.; Jones, Edward C.; Rondorf, Dennis W.

    2011-01-01

    A one-dimensional daily averaged water temperature model was used to simulate Klamath River temperatures for two management alternatives under historical climate conditions and six future climate scenarios. The analysis was conducted for the Secretarial Determination on removal of four hydroelectric dams on the Klamath River. In 2012, the Secretary of the Interior will determine if dam removal and implementation of the Klamath Basin Restoration Agreement (KBRA) (Klamath Basin Restoration Agreement, 2010) will advance restoration of salmonid fisheries and is in the public interest. If the Secretary decides dam removal is appropriate, then the four dams are scheduled for removal in 2020.

  19. Hydroelectricity - An Answer To Energy Needs

    Energy Technology Data Exchange (ETDEWEB)

    Francois-Xausa, Maryse; Havard, David; Czerwinski, Francois; Teller, Olivier

    2010-09-15

    The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

  20. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  1. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 199-205] South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project On May 26 and...) and the South Carolina Public Service Authority (SCPSA), licensee for the Santee-Cooper Hydroelectric...

  2. assessment of slope stability around gilgel gibe-ii hydroelectric

    African Journals Online (AJOL)

    preferred customer

    1 Gilgel-Gibe II Hydroelectric Project, Fofa Town, Ethiopia ... Key words/phrases: Factor of safety, plane failure, slope design, slope .... condition of potential unstable slopes along the road between Fofa town and Gilgel-Gibe Hydro- power II.

  3. Proceedings of the 15. CRIPE workshop on the hydraulics of ice covered rivers

    Energy Technology Data Exchange (ETDEWEB)

    Hicks, F. [Alberta Univ., Edmonton, AB (Canada). Dept. of Civil and Environmental Engineering] (comp.)

    2009-07-01

    This workshop focused on the hydraulic aspects of river ice phenomena and the effects of ice cover on flow characteristics. Ice processes play a large role in the hydrologic regime of Canadian rivers and are related to the life cycle of aquatic, terrestrial, and avian species. The most serious impacts of river ice occur during ice-jam flooding, affecting the winter operation of hydroelectric power plants and sometimes resulting in the loss of property and human life. The conference addressed these concerns as well as environmental aspects of river ice, and climatic change. The Committee on River Ice Processes and the Environment (CRIPE) identifies high-priority topics for research and development and promotes research programs at Canadian colleges and universities. In addition to a poster session, the workshop included sessions on ice measurement; freeze-up and frazil; ice processes and the environment; ice hydraulics; ice and river regulation; ice jams and breakup forecasting; ice and infrastructure; and remote sensing. The workshop featured 35 presentations, of which 3 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  4. Proceedings of the 15. CRIPE workshop on the hydraulics of ice covered rivers

    International Nuclear Information System (INIS)

    Hicks, F.

    2009-01-01

    This workshop focused on the hydraulic aspects of river ice phenomena and the effects of ice cover on flow characteristics. Ice processes play a large role in the hydrologic regime of Canadian rivers and are related to the life cycle of aquatic, terrestrial, and avian species. The most serious impacts of river ice occur during ice-jam flooding, affecting the winter operation of hydroelectric power plants and sometimes resulting in the loss of property and human life. The conference addressed these concerns as well as environmental aspects of river ice, and climatic change. The Committee on River Ice Processes and the Environment (CRIPE) identifies high-priority topics for research and development and promotes research programs at Canadian colleges and universities. In addition to a poster session, the workshop included sessions on ice measurement; freeze-up and frazil; ice processes and the environment; ice hydraulics; ice and river regulation; ice jams and breakup forecasting; ice and infrastructure; and remote sensing. The workshop featured 35 presentations, of which 3 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  5. Wind as a feasible alternative source for improving the deficiency of hydroelectricity in Tanzania

    International Nuclear Information System (INIS)

    Kainkwa, R. M.

    2006-01-01

    Hydroelectricity is the main source of electricity in Tanzania since about 86% of the electricity generated is from this source. During the dry season there is normally a storage of water in the dams and as such the electricity generated is below the demand. In 2004 a natural gas power plant was inaugurated to alleviate this shortage of electricity. When generating electricity from natural gas, exotic gases are emitted which pollute our environment. This source of energy also cannot regenerate itself within the human life scale. Wind is a renewable source that can be used to supplement the shortage of hydroelectricity in Tanzania. Wind speed data collected from a location with high wind energy potential shows that electricity can be generated from the wind to alleviate this shortage of hydroelectricity. Wind and rainfall data demonstrate further that the windy season, which is from July to November coincide with the dry season in which the use of wind energy in electric generation can help to fill the gap of the hydroelectricity that prevails during that season. The use of wind instead of natural gas will reduce the environmental pollution that results from extracting energy from the fossil fuel source.(Author)

  6. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Hydroelectric Project. e. All local, state, and federal agencies, tribes, and interested parties, are hereby...

  7. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies, tribes, and...

  8. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Science.gov (United States)

    2010-11-29

    ... Floodplain Statement of Findings for the Cushman Hydroelectric Project, Mason County, Washington... Project in Mason County, Washington. These components include a new 3.6 megawatt (MW) powerhouse on the... components of the Cushman Hydroelectric Project in Mason County, Washington. These components include a new 3...

  9. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Science.gov (United States)

    2010-08-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower... Hydropower, Inc. and Eldred L Field Hydroelectric Facility Trust. e. Name of Project: Lowell Hydroelectric... Affairs Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681...

  10. Present status and perspectives for hydroelectric power in world

    International Nuclear Information System (INIS)

    Malquori, E.

    1991-01-01

    In the note a review of the present status and perspectives of hydroelectric power in the world is introduced. The present status regards, in chronological order, the last decade, as to say the works carried out in the 80ies whereas the perspectives regard the next twenty years as to say until 2010. The mentioned electric power potentiality refers to pure generation plants of great, middle and small size and to what could be achieved by already existing plants after changes and/or replacements and improvement of the machinery. Beside the figures regarding powers, great generation and pumping plants whose contribution has been and will be remarkable have been properly mentioned. The Italian contribution - civil works design, construction, and machinery supply - in the last hydroelectric development is briefly mentioned with particular reference to the developing countries

  11. Turning to account the implicit side effects of hydroelectric projects implying reservoirs

    International Nuclear Information System (INIS)

    Ionescu, S.

    1996-01-01

    Operation of the hydroelectric projects including relatively important water reservoirs provides implicitly side effects favorable to water management (increase of minimum provided flows, flood routing, etc) and to related fields (additional facilities for water supply, extension of the public utility networks as: road, telecommunication, electric lines, favoring the tourism and recreative activities). The paper suggests methodologies for economic and financial assessment of these effects, the turning to account of which, may increase the efficiency of the hydroelectric development and may stimulate the interest for new investments in the field.(author). 3 figs., 5 refs

  12. Cumulative impacts of hydroelectric development on the fresh water balance in Hudson Bay

    International Nuclear Information System (INIS)

    Anctil, F.; Couture, R.

    1994-01-01

    A study is presented of the impacts of hydroelectric development on the surface water layer of Hudson Bay, including James Bay and the Foxe Basin. These impacts are directly related to the modifications in the fresh water balance of Hudson Bay and originate from the management of hydroelectric complexes. The fresh water balance is determined by identifying, at different scales, the modifications caused by each complex. The main inputs are the freezing and thawing of the ice cover, runoff water, and mass exchange at the air-water interface. Three spatial scales were used to obtain the resolution required to document the cumulative effects of fresh water balance modifications on the water surface layer, one each for Hudson Bay, Hudson Strait, and the Labrador Sea. Finally, the addition of the proposed Great Whale hydroelectric complex is examined from the available information and forecasts. 18 refs,. 6 figs., 1 tab

  13. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  14. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  15. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  16. The evolving policy regime for pumped storage hydroelectricity in China: A key support for low-carbon energy

    International Nuclear Information System (INIS)

    Zhang, Sufang; Andrews-Speed, Philip; Perera, Pradeep

    2015-01-01

    Highlights: • Highlights the role of pumped storage hydroelectricity in renewable energy integration. • Examines the development of pumped storage hydroelectricity in China. • Reviews the regulatory policies on pumped storage hydroelectricity in China. • Analyzes the operation and pricing regime for pumped storage hydroelectricity in China. • Makes policy recommendations for promoting pumped storage hydroelectricity in China. - Abstract: As part of its energy transition strategy, China has set ambitious targets for increasing the contribution of renewable energy and, in particular, of wind power. However, the Chinese power sector has not undergone the necessary reforms to facilitate the integration and absorption of a larger share of variable renewable energy. This is evident from the difficulties in absorbing wind power from already commissioned wind farms and the resultant curtailment of wind power. Pumped storage hydroelectricity (PSH) is a flexible power source that can facilitate higher penetration levels of wind power as well as complement China’s growing nuclear power capacity. However, regulatory policy constraints have restricted the effective utilization of existing PSH capacity and discouraged investment in new PSH capacity. This paper examines these constraints and assesses the likely impact of new policies designed to address them. Finally, policy recommendations and concluding remarks are provided. This paper contributes to the literature on renewable energy integration from a new perspective. The lessons from China are relevant to other countries going through the energy transition

  17. 78 FR 69663 - Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-11-20

    ... Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption 1. By letter filed October 15, 2013, Jonathan Chase informed the Commission that the exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December 2, 2011,\\1\\ has been transferred to Troy Mills...

  18. Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.J.; Green, L.L.

    1979-04-01

    The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

  19. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  20. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  1. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  2. Sub-Saharan hydroelectric power development potential

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1991-01-01

    Though evidencing a power demand which is amongst the lowest in the world, the sub-Saharan regions of Africa are blessed with an enormous hydroelectric power resource potential, which, if suitably developed and tapped, may become a source of economic electric energy for Europe. With the aid of numerous statistical supply and demand data, this paper surveys the marketing potential of this energy source in Africa. The analysis of future development prospects is carried out with reference to the local socio-economic framework

  3. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  4. Impacts of hydropower operation on water supply from lower Colorado River in Texas

    International Nuclear Information System (INIS)

    Martin, Q.W.

    1993-01-01

    The Lower Colorado River Authority (LCRA) of Texas is both a water and energy supplier to a large area of Central Texas. LCRA generates approximately 10 percent of its power from hydroelectric power plants on the six dams in the Highland Lakes system of reservoirs. To improve power production, LCRA has investigated alternative operating procedures to increase the winter scheduling of hydroelectric power generation in the upper reservoirs of the Highland Lakes system without adversely impacting available water supplies. A methodology using both optimization and simulation techniques was developed to evaluate the ability of the hydroelectric facilities to meet weather-related winter peaking requirements. A linear programming procedure determined the hourly power generation schedule, over a 24 hour period, that maximized the total amount of power generated over the six hours of peak power demand. The full installed capacity was found to be available during the peak hours without violating system operating constraints including water storage limits at the individual lakes. Based on statistical simulation of daily winter inflows and releases using a LOTUS 1-2-3 spreadsheet, it was found that the full generating capacity could be supplied to meet the weather-related peak winter power demand with no significant impact on water availability

  5. Three run-of-river power plants

    International Nuclear Information System (INIS)

    1992-01-01

    Three 'run-of-river' hydroelectric power plants in the Montreal area in the province of Quebec were described visually and in sound. A run-of-river generating station is one that has no reservoir behind the generating facilities. Instead of a reservoir, the generating station draws its power from the strong flow of the whole river as it passes through the turbines. The first generating station described was the Beauharnois power plant completed in 1963 which became the most powerful generating station in Canada at that time. Today, it ranks fourth after the La Grande complex. In winter, it supplies electricity primarily to the Quebec power system, but between April and November, 90 per cent of its power is destined for export. The Carillon power station on the Ottawa River, the second to be discussed in this videotape presentation, was completed in 1964 with a total generating capacity of 654 MW. Today, it is the tenth largest of its kind in Quebec. The Rivieres des Prairies generating station, the third and last one described was completed in 1930; today it has a generating capacity of 45 MW. Some of the efforts made by Hydro-Quebec to protect and enhance the natural environment were shown in action, including regular removal and recycling of debris at the gateways to the generating stations, construction of fish spawning ladders, and the control of zebra mussels

  6. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  7. Science partnership between U.S. Geological Survey and the Lower Elwha Klallam Tribe—Understanding the Elwha River Dam Removal Project

    Science.gov (United States)

    Duda, Jeffrey J.; Beirne, Matt M.; Warrick, Jonathan A.; Magirl, Christopher S.

    2018-04-16

    After nearly a century of producing power, two large hydroelectric dams on the Elwha River in Washington State were removed during 2011 to 2014 to restore the river ecosystem and recover imperiled salmon populations. Roughly two-thirds of the 21 million cubic meters of sediment—enough to fill nearly 2 million dump trucks—contained behind the dams was released downstream, which restored natural processes and initiated important changes to the river, estuarine, and marine ecosystems. A multidisciplinary team of scientists from the Lower Elwha Klallam Tribe, academia, non-governmental organizations, Federal and state agencies, and the U.S. Geological Survey collected key data before, during, and after dam removal to understand the outcomes of this historic project on the Elwha River ecosystem.

  8. Non-volant mammals in a protected area on the Central Andes of Colombia: new records for the Caldas department and the Chinchiná River basin

    OpenAIRE

    Ramírez-Mejía, Andrés; Sánchez, Francisco

    2015-01-01

    The Chinchiná River basin is located on the western slope of the Colombian Central Andes. This basin provides ecosystem services such as water provision for >500,000 people, but has suffered considerable ecosystem degradation, and the information on its biodiversity is limited. We inventoried the non-volant mammals in the Caldas' Central Hydroelectric (CHEC) Reserve in the Chinchiná River basin, in the Caldas department. We detected 18 species of mammals, present the first record of Puma ya...

  9. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13824-000, 13826-000] FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary Permit... Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17, LLC, Project No. 13824-000. Dated: February 22...

  10. The Dokka delta - consequences of water power development in the River Dokka

    International Nuclear Information System (INIS)

    Halvorsen, Gunnar; Sloreid, Svein-Erik; Walseng, Bjoern

    1997-11-01

    The report concerns an investigation done in Norway on environmental consequences of hydroelectric power development in the Dokka river. This development has reduced the water flow through the Dokka delta to about 50% of its natural level. The biological effect of the reduction has been studied in the period from 1987 to 1990, comprising two years before and two years after the reduction. Sedimentation, water chemistry, planktonic and littoral crustaceans and bottom fauna have been studied. 223 refs., 58 figs., 9 tabs

  11. Hydroelectric resources. Inventory of the hydroelectric resources of the Atlantic Coast

    International Nuclear Information System (INIS)

    Arrieta, R.M.; Insignares R, G.

    1987-01-01

    Basically this report gives a clear vision of the possibilities of energy development in the Colombian Atlantic Coast, projects that contemplate a wide range as soon as it refers that is to say to generation ranges, they have been identified at level macro in the Sierra Nevada region and the Peasant with a profitable hydroelectric potential of 631 MW; in the Sinu region, 3 projects were identified with a profitable potential of 1186 MW and in the Magdalena region, was also identified 3 projects whose profitable potential is of 475 MW. At level micro, the carried out studies defined in the same previous regions a series of projects that they necessarily reach the megawatt. The report contains a description of each one of the identified projects and its current situation. It also presents a review of the makers of turbines that exist at the moment in the country

  12. Gonad organochlorine concentrations and plasma steroid levels in white sturgeon (Acipenser transmontanus) from the Columbia River, USA

    Science.gov (United States)

    Foster, E.P.; Fitzpatrick, M.S.; Feist, G.W.; Schreck, C.B.; Yates, J.

    2001-01-01

    Sturgeon are an important fishery resource world-wide, providing food and income through commercial, sport, and tribal fisheries. However, sturgeon populations are imperiled in many areas due to overharvest, habitat loss, and pollution. White Sturgeon (Acipenser transmontanus) are found along the west coast of North America from San Francisco Bay, USA to British Columbia, Canada. The Columbia River, located in the Pacific Northwest USA, supports active commercial, sport, and tribal white sturgeon fisheries. The white sturgeon fishery in the Columbia River estuary is one of the most productive sturgeon fisheries in the World. Despite the success of the Columbia River estuary white sturgeon fishery, the populations within the impounded sections (i.e. behind the hydroelectric dams) of the Columbia River experience poor reproductive success (Beamesderfer et al. 1995). This poor reproductive success has been attributed to hydroelectric development, but water pollution could also be a significant factor. The bottom dwelling life history and late maturing reproductive strategy for this species may make it particularly sensitive to the adverse effects of bioaccumulative pollutants.The Columbia River receives effluent from bleached-kraft pulp mills, aluminum smelters, municipal sewage treatment plants and runoff from agricultural. industrial, and urban areas. Bioaccumulative contaminants that have the potential for endocrine disruption have been detected in fish and sediments from the Columbia River (Foster et al. 1999). An integrated system of hormones control reproduction in vertebrates. Plasma steroids direct developmental events essential for reproduction. Disruption of endocrine control by contaminants has been linked to reproductive anomalies and failure in a number of vertebrate species (Guillette et al. 1996; Jobling et al. 1996). Because of this, it is important to understand if organochlorine compounds are accumulating in Columbia River white sturgeon and having

  13. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  14. Effects of streamflows on stream-channel morphology in the eastern Niobrara National Scenic River, Nebraska, 1988–2010

    Science.gov (United States)

    Schaepe, Nathaniel J.; Alexander, Jason S.; Folz-Donahue, Kiernan

    2016-03-09

    The Niobrara River is an important and valuable economic and ecological resource in northern Nebraska that supports ecotourism, recreational boating, wildlife, fisheries, agriculture, and hydroelectric power. Because of its uniquely rich resources, a 122-kilometer reach of the Niobrara River was designated as a National Scenic River in 1991, which has been jointly managed by the U.S. Fish and Wildlife Service and National Park Service. To assess how the remarkable qualities of the National Scenic River may change if consumptive uses of water are increased above current levels, the U.S. Geological Survey, in cooperation with the National Park Service, initiated an investigation of how stream-channel morphology might be affected by potential decreases in summer streamflows. The study included a 65-kilometer segment in the wide, braided eastern stretch of the Niobrara National Scenic River that provides important nesting habitat for migratory bird species of concern to the Nation.

  15. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  16. Groundwater-Surface Water Interactions and Downstream Transport of Water, Heat, and Solutes in a Hydropeaked River

    Science.gov (United States)

    Ferencz, S. B.; Cardenas, M. B.; Neilson, B. T.; Watson, J.

    2017-12-01

    A majority of the world's largest river systems are regulated by dams. In addition to being used for water resources management and flood prevention, many large dams are also used for hydroelectric power generation. In the United States, dams account for 7% of domestic electricity, and hydropower accounts for 16% of worldwide electricity production. To help meet electricity demand during peak usage times, hydropower utilities often increase their releases of water during high demand periods. This practice, termed hydropeaking, can cause large transient flow regimes downstream of hydroelectric dams. These transient flow increases can result in order of magnitude daily fluctuations in discharge, and the released water can have different thermal and chemical properties than ambient river water. As hydropeaking releases travel downstream, the temporary rise in stage and increase in discharge can enhance surface water-groundwater (SW-GW) exchange between the river and its alluvial aquifer. This dam-induced SW-GW exchange, combined with hydrodynamic attenuation and heat exchange processes, result in complex responses downstream. The dam-regulated Lower Colorado River downstream of Austin, TX was used as a natural laboratory to observe SW-GW interactions and downstream transport of water, heat, and solutes under hydropeaking conditions. To characterize SW-GW interactions, well transects were installed in the banks of the river to observe exchanges between the river and alluvial aquifer. The well transects were installed at three different distances from the dam (15km, 35km, and 80km). At each well transect conductivity, temperature, and pressure sensors were deployed in the monitoring wells and in the channel. Additional conductivity and temperature sensors were deployed along the study reach to provide a more detailed record of heat and solute transport during hydropeaking releases. The field data spans over two months of daily dam releases that were punctuated by two

  17. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  18. Fish entrainment and mortality at the French Landing Hydroelectric Powerhouse

    International Nuclear Information System (INIS)

    Sundquist, M.J.

    1991-01-01

    This paper is a case study which explains the fish mortality study performed and results obtained at an existing hydroelectric powerhouse in Michigan. Undertaken in 1989 and 1990, this study provides data for determining effects of turbine passage on area fish

  19. Natural infection by Paramphistomoidea Stiles and Goldberger, 1910 trematodes in wild Marsh Deer (Blastocerus dichotomus Illiger, 1815) from Sérgio Mottas's hydroelectric power station flooding area.

    Science.gov (United States)

    do Nascimento, Cristiano G; do Nascimento, Adjair A; Mapeli, Elaine B; Tebaldi, José H; Duarte, José M B; Hoppe, Estevam G Lux

    2006-01-01

    Studies on helminthfauna of marsh deer Blastocerus dichotomus Illiger, 1815 are rare, although helminthic diseases are an important cause of mortality in these animals. Fifteen male and female adult marsh deer from Sergio Motta's hydroelectric power station flooding area at Paraná River which died during the capture and quarantine procedures, between 1998 and 1999, were necropsied. Three trematodes species, Paramphistomum cervi, Balanorchis anastrofus and Zygocotyle lunatum, all belonging to superfamily Paramphistomoidea, were identified. The obtained trematodes were identified, counted and their respectives descriptors of infection were determined. All necropsied animals were infected by helminths. Paramphistomum cervi was the most prevalent species, while Zygocotyle lunatum was found in only one animal.

  20. The hydrogen economy urgently needs environmentally sustainable hydroelectricity

    International Nuclear Information System (INIS)

    Goodland, R.

    1995-01-01

    Only two sources of energy were said to have the capacity to bridge the transition to fully sustainable and renewable energy, namely natural gas and hydro. The argument was made that because of this advantage, both forms will have to be promoted fast, since the transition to sustainable energy is urgent. In so far as natural gas supplies are concerned, it was estimated that they will last for perhaps the next 50 years, whereas hydroelectric potential is practically unlimited. Developing nations could vastly accelerate their development, reduce poverty and approach sustainability by exporting hydro to industrial countries. Similarly, industrial nations switching from fossil fuels to hydrogen could move up the environmental ranking, and significantly help alleviating global pollution and climate risks. Environmental ranking of new energy sources, world reservoirs of hydroelectric power, environmental and social ranking of hydro sites, the environmental impacts of hydro projects, and the concept of environmental sustainability in hydro reservoirs, were summarized. Greater acceptance of the need for sustainable development by the hydro industry was urged, along with more care in selecting hydro development sites with sustainability as a prime objective. 23 refs., 6 figs

  1. Feeding ecology of Leporinus taeniofasciatus (Characiformes: Anostomidae before and after installation of a hydroelectric plant in the upper rio Tocantins, Brazil

    Directory of Open Access Journals (Sweden)

    Miriam P. Albrecht

    Full Text Available The feeding ecology of Leporinus taeniofasciatus in the upper rio Tocantins was characterized before (river phase and after (reservoir phase its impoundment by the Serra da Mesa Hydroelectric Dam. The importance of each food item was given by the Alimentary Index (IAi, which combines the frequency of occurrence and volumetric methods. A significant difference in the diet of L. taeniofasciatus between seasons in the river phase, detected by a multivariate analysis of variance, was not kept when the reservoir was formed. Its feeding activity, verified through the percentage of stomachs with different degrees of fullness, was not affected by the impoundment. Leporinus taeniofasciatus was able to incorporate terrestrial food items to its diet when they became abundantly available at the beginning of reservoir formation. Despite this plasticity, secondary factors such as predation and competition might have affected its adaptation in the new, more homogeneous environment. Its diet was not significantly different in the lotic sites between the distinct phases, suggesting that the remaining upstream lotic environments still provide favorable conditions for this species, reinforcing the need to preserve those habitats, as L. taeniofasciatus, which is apparently endemic to the Tocantins basin, may be threatened.

  2. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  3. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930)

    OpenAIRE

    Mortati, Débora Marques de Almeida Nogueira; Argollo Ferrão, André Munhoz de

    2011-01-01

    The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The el...

  4. Proceedings of a workshop on dealing with uncertainties in the hydroelectric energy business. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-01-01

    This workshop was attended by experts in Canadian and international hydroelectric utilities to exchange information on current practices and opportunities for improvement or future cooperation. The discussions focused on reducing the uncertainties associated with hydroelectric power production. Although significant improvements have been made in the efficiency, reliability and safety of hydroelectric power production, the sector is still challenged by the uncertainty of water supply which depends greatly on weather conditions. Energy markets pose another challenge to power producers in terms of energy supply, energy demand and energy prices. The workshop focused on 3 themes: (1) weather and hydrologic uncertainty, (2) market uncertainty, and (3) decision making models using uncertainty principles surrounding water resource planning and operation. The workshop featured 22 presentations of which 11 have been indexed separately for inclusion in this database. refs., tabs., figs

  5. The problem related to the development of the Senegal river after the construction of the Diama and Manantali dams

    International Nuclear Information System (INIS)

    Evora, N.D.; Ribeiro, J.; Rousselle, J.

    1996-01-01

    Two dams are operated on the Senegal river to prevent salt water from going upstream, to regularize the river flow and to make possible permanent navigation on the river, and to undertake irrigation and hydroelectric energy production projects. A few years after the filling of the last dam, the environmental and health consequences proved not to be as beneficial as expected. Problems emerged in four areas: (1) irrigated agriculture was not as popular as forecast, (2) tenure problems became widespread, (3) health problems related to various kinds of bilharziosis were noticed, and (4) environmental problems related to the lower salinity of the water, and water pollution due to the use of fertilizers occurred. Ecological changes along the river were also significant. Water management proposals and other corrective measures that should be taken to preserve the river as a source of life-sustaining water, and to avoid social and economic disaster for the riparian countries of Mauritania, Mali and Senegal, were described. 14 refs., 1 fig

  6. Expanding the functional significance of automated control systems for the production process at hydroelectric plants

    International Nuclear Information System (INIS)

    Vasil'ev, Yu.S.; Kononova, M.Yu.

    1993-01-01

    Automated control systems for the production process (ACS PP) have been successfully implemented in a number of hydroelectric plants in the Russian Federation. The circle of problems that can be solved using ACS PP can be conditionally divided into two classes: on-line/technological control, and production-technological control. This article describes successes and future directions for the solution of these two classes of problems. From the discussion, it is concluded (1) that the data base for existing ACS PP at hydroelectric plants can be successfully employed as points for monitoring the conservation of an environment of local significance; (2) that is is expedient to discuss the problem with organizations, including local control groups interested in the development of territorial-basin systems for ecological monitoring; and (3) that the initiative in creating local territorial-basin support points for monitoring should emanate from guidelines for hydroelectric plants with ACS PP. 3 refs., 2 figs

  7. Measurents of natural radioactivity in an underground hydroelectric power plant

    International Nuclear Information System (INIS)

    Malvicini, Andrea; Esposito, PierLuigi; Depiesse, Danielle

    2008-01-01

    In underground working places, especially when ventilation is not properly regulated, large amounts of natural radioactivity can be found. This can give rise to potential exposures of non-negligible magnitude. Direct measurements of gamma radiation and radon were carried out during excavation works for the construction of an hydroelectric plant in the north of Italy. After the construction of the plant, in order to reduce radon concentrations and to improve ventilation effectiveness, the main entry gate was motorized and automated. Then, in order to find the optimal speed for the fans located in the galleries and in the power plant, radon and airflow velocity were measured. Correlation data between airflow and radon concentrations were found. An automatic regulation system has been set up using air velocity detectors and slightly modifying the software for the control and regulation of the power plant. Measurements must be made in order to identify radon sources and evaluate quantitative contributions as a function of ventilation. Underground hydroelectric plants are provided with entry galleries as well as secondary galleries from which radon coming out from the soil and the walls can exhale in quantities that depend on the contents of 226 Ra in the rocks and in the building materials. Other radon sources are the water coming out from the walls of the galleries and the water in the deep well located at the bottom of the power plant. Geological studies and mathematical models are useful means for the analysis of the relative contributions of the main sources as well as for the prediction of the effects deriving from modifications of the hydroelectric plant ventilation system or resulting from other important structural changes. (author)

  8. Canadian Environmental Assessment Act : A comprehensive study report on the Peribonka hydroelectric power project

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents the results of an environmental assessment of Hydro-Quebec's proposed project to build a new facility on the Peribonka River. The facility includes a run-of-river generating station with an installed capacity of 385 MW. The Quebec Region of the Department of Fisheries and Oceans Canada has conducted an environmental assessment of the project's effects. A summary of the project and the environment in which it will be carried out was presented along with the results of public consultations conducted by Hydro-Quebec. A summary of the main environmental effects was included along with cumulative effects and the effects caused by accidents or malfunctions that may occur. In addition, the terms and conditions of mitigation measures and follow-up programs were described and the significance of any environmental impacts were assessed. The project includes the construction of a 80 metre high dam, two dikes and one spillway upstream of the mouth of the Manouane River. The level of the reservoir would remain at close to its maximum level of 244.2 metres to optimize hydroelectric production. The power house would be integrated into the Hydro-Quebec transmission network. The main impacts of the project would result from the construction of the reservoir, the encroachment caused by associated facilities and the changes in hydrological conditions. This report outlined the current use of lands and resources for traditional purposes by Aboriginals. It also discussed the effects of natural events such as flooding, waves and climate that may cause damage to the facilities. It was determined that the project is not likely to cause significant effects on the renewable resources of the forest and the fisheries. The Department of Fisheries and Oceans, after having taking into account proposed mitigation measures, has rendered a preliminary conclusion which states that the project is not likely to have significant negative environmental effects. 29 refs., 7 tabs., 2

  9. Tree-ring reconstruction of streamflow in the Snare River Basin, Northwest Territories, Canada

    Science.gov (United States)

    Martin, J. P.; Pisaric, M. F.

    2017-12-01

    Drought is a component of many ecosystems in North America causing environmental and socioeconomical impacts. In the ongoing context of climatic and environmental changes, drought-related issues are becoming problematic in northern Canada, which have not been associated with drought-like conditions in the past. Dryer than average conditions threatens the energy security of northern canadian communities, since this region relies on the production of hydroelectricity as an energy source. In the North Slave Region of Northwest Territory (NWT), water levels and streamflows were significantly lower in 2014/2015. The Government of the NWT had to spend nearly $50 million to purchase diesel fuel to generate enough electricity to supplement the reduced power generation of the Snare River hydroelectric system, hence the need to better understand the multi-decadal variability in streamflow. The aims of this presentation are i) to present jack pine and white spruce tree-ring chronologies of Southern NWT; ii) to reconstruct past streamflow of the Snare River Basin; iii) to evaluate the frequency and magnitude of extreme drought conditions, and iv) to identify which large-scale atmospheric or oceanic patterns are teleconnected to regional hydraulic conditions. Preliminary results show that the growth of jack pine and white spruce populations is better correlated with precipitation and temperature, respectively, than hydraulic conditions. Nonetheless, we present a robust streamflow reconstruction of the Snare River that is well correlated with the summer North Atlantic Oscillation (NAO) index, albeit the strength of the correlation is non-stationary. Spectral analysis corroborate the synchronicity between negative NAO conditions and drought conditions. From an operational standpoint, considering that the general occurrence of positive/negative NAO can be predicted, it the hope of the authors that these results can facilitate energetic planning in the Northwest Territories through

  10. Assessing the impacts of water abstractions on river ecosystem services: an eco-hydraulic modelling approach

    Energy Technology Data Exchange (ETDEWEB)

    Carolli, Mauro, E-mail: mauro.carolli@unitn.it; Geneletti, Davide, E-mail: davide.geneletti@unitn.it; Zolezzi, Guido, E-mail: guido.zolezzi@unitn.it

    2017-03-15

    The provision of important river ecosystem services (ES) is dependent on the flow regime. This requires methods to assess the impacts on ES caused by interventions on rivers that affect flow regime, such as water abstractions. This study proposes a method to i) quantify the provision of a set of river ES, ii) simulate the effects of water abstraction alternatives that differ in location and abstracted flow, and iii) assess the impact of water abstraction alternatives on the selected ES. The method is based on river modelling science, and integrates spatially distributed hydrological, hydraulic and habitat models at different spatial and temporal scales. The method is applied to the hydropeaked upper Noce River (Northern Italy), which is regulated by hydropower operations. We selected locally relevant river ES: habitat suitability for the adult marble trout, white-water rafting suitability, hydroelectricity production from run-of-river (RoR) plants. Our results quantify the seasonality of river ES response variables and their intrinsic non-linearity, which explains why the same abstracted flow can produce different effects on trout habitat and rafting suitability depending on the morphology of the abstracted reach. An economic valuation of the examined river ES suggests that incomes from RoR hydropower plants are of comparable magnitude to touristic revenue losses related to the decrease in rafting suitability.

  11. Assessing the impacts of water abstractions on river ecosystem services: an eco-hydraulic modelling approach

    International Nuclear Information System (INIS)

    Carolli, Mauro; Geneletti, Davide; Zolezzi, Guido

    2017-01-01

    The provision of important river ecosystem services (ES) is dependent on the flow regime. This requires methods to assess the impacts on ES caused by interventions on rivers that affect flow regime, such as water abstractions. This study proposes a method to i) quantify the provision of a set of river ES, ii) simulate the effects of water abstraction alternatives that differ in location and abstracted flow, and iii) assess the impact of water abstraction alternatives on the selected ES. The method is based on river modelling science, and integrates spatially distributed hydrological, hydraulic and habitat models at different spatial and temporal scales. The method is applied to the hydropeaked upper Noce River (Northern Italy), which is regulated by hydropower operations. We selected locally relevant river ES: habitat suitability for the adult marble trout, white-water rafting suitability, hydroelectricity production from run-of-river (RoR) plants. Our results quantify the seasonality of river ES response variables and their intrinsic non-linearity, which explains why the same abstracted flow can produce different effects on trout habitat and rafting suitability depending on the morphology of the abstracted reach. An economic valuation of the examined river ES suggests that incomes from RoR hydropower plants are of comparable magnitude to touristic revenue losses related to the decrease in rafting suitability.

  12. Numerical Simulation of Missouri River Bed Evolution Downstream of Gavins Point Dam

    Science.gov (United States)

    Sulaiman, Z. A.; Blum, M. D.; Lephart, G.; Viparelli, E.

    2016-12-01

    The Missouri River originates in the Rocky Mountains in western Montana and joins the Mississippi River near Saint Louis, Missouri. In the 1900s dam construction and river engineering works, such as river alignment, narrowing and bank protections were performed in the Missouri River basin to control the flood flows, ensure navigation and use the water for agricultural, industrial and municipal needs, for the production of hydroelectric power generation and for recreation. These projects altered the flow and the sediment transport regimes in the river and the exchange of sediment between the river and the adjoining floodplain. Here we focus on the long term effect of dam construction and channel narrowing on the 1200 km long reach of the Missouri River between Gavins Point Dam, Nebraska and South Dakota, and the confluence with the Mississippi River. Field observations show that two downstream migrating waves of channel bed degradation formed in this reach in response to the changes in flow regime, sediment load and channel geometry. We implemented a one dimensional morphodynamic model for large, low slope sand bed rivers, we validated the model at field scale by comparing the numerical results with the available field data and we use the model to 1) predict the magnitude and the migration rate of the waves of degradation at engineering time scales ( 150 years into the future), 2) quantify the changes in the sand load delivered to the Mississippi River, where field observations at Thebes, i.e. downstream of Saint Louis, suggest a decline in the mean annual sand load in the past 50 years, and 3) identify the role of the main tributaries - Little Sioux River, Platte River and Kansas River - on the wave migration speed and the annual sand load in the Missouri River main channel.

  13. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  14. Small hydroelectricity at the low point?

    International Nuclear Information System (INIS)

    Mary, Olivier

    2015-01-01

    Small hydroelectricity displays an interesting potential in France (about 1.000 MW), but, as outlined in this article and despite technological advances, this sector is not growing significantly, notably for regulatory reasons: there is no consensus on the impact of these constructions on the environment. The article also outlines that development costs are always higher. These environmental and economic issues result in a transformation of the sector: old and ageing plants owned by individuals are sold to other actors, forms of deregulation are appearing to support the development. In parallel, the article notices that installations depend on their geographical context, and that it is also possible to produce electricity in plains

  15. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  16. Efficiency analysis of hydroelectric generating plants: A case study for Portugal

    International Nuclear Information System (INIS)

    Barros, Carlos Pestana

    2008-01-01

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of 'best practices'. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  17. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  18. Changing stream of power. Hydropower and local residents along the Kemi River; Valtavirta muutoksessa. Vesivoima ja paikalliset asukkaat Kemijoella

    Energy Technology Data Exchange (ETDEWEB)

    Autti, O.

    2013-11-01

    The construction of human-controlled watercourses to meet the need for hydroelectric power has substantially changed freshwater ecosystems, as well as the cultural dynamics of local communities along the Kemi River. At the moment there are 21 hydropower plants in the Kemi River basin, and further building is still topical. The construction of hydropower plants gave benefits but it also caused damages to the people living along the Kemi River. It was a deathblow to salmon migration. The alteration of the river has radically changed the water environment, the landscape and the usage of the river environment. The processed conflicts and paid compensations are always connected to economic losses, but the river has also many other aspects and meanings from the viewpoint of a riverman. The planning and building of hydroelectric plants took place at the same time with other significant events in northern Finland. The rise of the forestry industry, the Second World War, post-war reconstruction and structural changes in society framed the electrification of northern rivers. The transformation from an agrarian society to a service and information society happened unusually fast in Finland. It involved every aspect of local people's lives, as the physical environment, local culture, social relations, means of income and the surrounding society changed in a short period of time. In my research I examine the changes caused by the electrification of the Kemi River in their temporal and spatial context. The focus is on the perspectives of local people and their personal relationships with the environment, but on the other hand also on the power relations within various actor groups. From my interview data I have identified four different adaptation strategies: compliant builders, those in denial, resigned bystanders and opposing resisters. These strategies may be found overlapping in the stories of the interviewees. Local residents have had an opportunity to realign

  19. MODERNISATION OF WATER BARRAGE IN SKÓRKA VILLAGE ON THE GŁOMIA RIVER

    Directory of Open Access Journals (Sweden)

    Paweł Zawadzki

    2015-10-01

    Full Text Available In 2012 the construction of a weir, a bridge and a fish pass on the river Głomia in the Skórka village was completed. The new weir allowed to continue operating hydroelectric power station (12 kW. The construction of fish ladders allowed the migration. The analysis of water flows by the barrage indicates the need for modernization of hydroelectric power. The problem on the barrage is also to provide sufficient current attractant in order to identify a suitable way for migratory fish. The analysis of the technical solutions proposed the construction of a second fish pass. The paper presents a detail analysis of the modernization of the barrage yet, taking into account all the elements constituting the upper and lower positions of the structure. Reconstruction of hydrotechnical objects, technical condition of which requires modernization should take into account the performance characteristics of all elements of the barrage to avoid the need to improve the operation of the elements already modernized. The repair work should be different scenarios that may occur during the lifetime of barrage.

  20. Hydroelectric power development and the ice regime of inland waters: A northern community perspective

    International Nuclear Information System (INIS)

    Gerard, R.

    1989-03-01

    Inland waters play a vital role in the life of the many small northern communities which depend in large measure on the provisions of the natural environment for their sustenance. These communities are therefore particularly vulnerable to changes in the ice regime of these waters, especially changes that are irregular. However, the north is also the site of much of Canada's hydroelectric power development and potential, developments that have a major influence on the ice regime of effected waters. As a contribution to the background information required for the necessary discussions and negotiations associated with such developments, the various aspects of the natural ice regime, the possible effects of hydroelectric development and operation on this regime, and its consequences, are briefly reviewed. The emphasis has been placed on changes that will likely be of most significance to northern communities in the bedrock-controlled country of the western Canadian Shield. The major direct, and in some circumstances life-threatening, impact of changes to the ice regime is on trafficability of the iceways that play such a vital role in the life of the communities. Hence particular emphasis has been placed on this aspect and on the formation of the slush and thin ice conditions that are the bane of over-ice travel and that are subject to unexpected changes by hydroelectric development and operation. To place these changes and their effects in some perspective, the nature of a hydroelectric development is also briefly described and an effort made to indicate the large costs incurred if these developments are restrained in their operation to avoid or mitigate some of the effects on the ice regime. 31 refs., 57 figs., 1 tab

  1. constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    KEYWORDS: Constraints; craftsmen; funds; highlands; hydroelectric. INTRODUCTION ... MATERIAL AND METHODS. 1.1 Physical ... (Bamougoum; Bapi; Batotcha) are due to the use ... water very often escapes from the air vent because of its .... The funds raised will remedy ... Graw-Hill Book Company New York,. USA.

  2. Impacts of the operation of existing hydroelectric developments on fishery resources in British Columbia

    International Nuclear Information System (INIS)

    Hirst, S.M.

    1991-01-01

    The main features of 46 hydroelectric dams and diversions in British Columbia are reviewed, and available information on the inland sport fish resources within and below the impoundments are summarized. The projects are collectively responsible for ca 95% of the electrical power used in the province. The characteristics detailed include water license and operational constraints, electrical generation, enhancement facilities, operational regime, physical and chemical environment, downstream system, sportfish populations, and recreational fishery. All the hydroelectric impoundments reviewed, with the possible exceptions of some small headponds, support sport fish populations. Recreational angling quality is considered good for about one quarter of impoundments for which information is available. Low population density is the dominant reason for poor angling quality. Drawdowns exceeding 10 m annually and/or low water retention times are significant impediments to sport fish stock densities. Recommended measures to improve sport fishery resources in and below hydroelectric impoundments include evaluation of the efficiency of ongoing compensation programs, improvement to impact assessment procedures to ensure adequate documentation of pre- and post-impoundment conditions, and enhancement of several systems through stock or nutritional supplementation. 161 refs., 95 figs., 9 tabs

  3. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  4. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  5. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P; Croci, S; Ernst, J -R

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  6. Effects of flooding of the River Paraná on the temporal activity of Anopheles (Nyssorhynchus) darlingi Root (Diptera: Culicidae), at the border state of Mato Grosso do Sul and São Paulo, Brazil

    OpenAIRE

    Gomes,Almério de Castro; Paula,Marcia Bicudo de; Natal,Delsio; Gotlieb,Sabina Léa Davidson; Mucci,Luis Filipe

    2010-01-01

    INTRODUCTION: Study of the temporal activity of malaria vectors during the implantation of a hydroelectric power station on the River Paraná, intended to generate electrical energy. The river separates the States of São Paulo and Mato Grosso do Sul, in Brazil. The objective was to verify whether alterations occurred in the wealth and diversity indices of Anopheles, following two successive floods, extended to the temporal activity and nycthemeral rhythm followed over a five year period. METHO...

  7. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930

    Directory of Open Access Journals (Sweden)

    Débora Marques de Almeida Nogueira Mortati

    2011-06-01

    Full Text Available The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The electricity generation in Brazil follows the paths of the railroad; and it was drawing newborders between rural and urban, rural and industry. The cities aspect was changing as the “improvements” were availability, many powered by electricity. The nascent industries were also occupying the space between the railroad and energy; what created new districts and centralities. Thispaper analyzes the processes that hydroelectric energy sets off in São Paulo state; and focuses on itsconsequences.

  8. Hydroelectric power: Energy vector for progress and development; Wasserkraft: Energievektor fuer Fortschritt und Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Meclot, B; Dupuy, M; Weis, H; Linari, A; Baril, M; Barlow, M; Cambi, M; Cullen, R; Genier, M; Germeau, J P; Madureira, C; Mellquist, P; Perea, A; Rost, M; Savey, P; Schiller, G; Talhull, A

    1997-11-01

    Hydroelectric power in the UNIPEDE member states has a share of about 18 percent, i.e. slightly less than the world average of 19 percent. Hydroelectric power has good future prospects: It is a renewable energy source and well suited for storage. (orig) [Deutsch] Wasserkraft ist eine Energie, die im Rahmen der von den Mitgliedslaendern der UNIPEDE genutzten Energieerzeugungsarten eine hohe Bedeutung hat. Sie repraesentiert durchschnittlich 18% der erzeugten elektrischen Energie, leicht unterhalb des weltweiten Durchschnitts (19%). Die Merkmale der Wasserkraft verdienen Aufmerksamkeit: Es handelt sich um eine erneuerbare Energie, die in grossen Mengen gespeichert werden kann und in der Energiewirtschaft eine grosse Rolle spielt. (orig.)

  9. Environmental investigations preceding the hydroelectric project Johan Dahl Land Narssaq, 1982. Miljoe-undersoegelser for vandkraftprojekt Johan Dahl Land Narssaq, 1982

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    This report presents the results of an environmental study carried out in the Qingua/Tunugliarfik Fiord area north of Narssarssuaq in July-October, 1982. The field work in the area included hydrographic investigations in the Tunugliarfik Fiord, fishery investigations in the Qingua river and a survey of the area likely to be affected by a hydro-electric plant. Information on commercial and sport fishing, hunting, sheep-farming, tourism, and conservation interests was also collected. The hydrographic investigations have shown that the inner part of Tunugliarfik is dominated by the estuarine circulation in the upper layer clearly influenced by the Qoroq Fiord. The lower 5 km of the river contain a large population of arctic char. The size of the migrating stock, i.e. excluding young and residual fish, is estimated at 10.000 - 20.000 fish. A series of waterfalls in the end of the Qingua valley constrains migrating fish to the lower river area. Beyond the falls two separate populations of stream-resident arctic char are found. Another non-migrant population is found in the Nordbo/Storesoe area. The arctic char fishery is locally of great importance. The fishery, which is carried out by use of gill net, is particularly extensive in the inner part of the Tunugliarfik Fiord. The Qiangua valley is also a popular site for anglers coming to the area by a daily boat from the hotel in Narssarssuaq. Besides char, great quantities of Greenland cod and Greenland halibut are caught in the fiord. The major part of the catch is consumed locally.

  10. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  11. Impacts of nuclear and hydroelectric great projects: economical, technological, environmental and social aspects

    International Nuclear Information System (INIS)

    Rosa, L.P.; Sigaud, L.; Mielnik, O.

    1988-01-01

    Some studies about the Great Impacts of Energy Sources, mainly nuclear power plant and hydroelectric power plant, in Brazil are presented. The technological, economical, social and environmental aspects are described [pt

  12. Robust Optimisation for Hydroelectric System Operation under Uncertainty

    OpenAIRE

    Apostolopoulou, D.; De Greve, Z.; McCulloch, M.

    2018-01-01

    In this paper, we propose an optimal dispatch scheme for a cascade hydroelectric power system that maximises the head levels of each dam, and minimises the spillage effects taking into account uncertainty in the net load variations, i.e., the difference between the load and the renewable resources, and inflows to the cascade. By maximising the head levels of each dam the volume of water stored, which is a metric of system resiliency, is maximised. In this regard, the operation of the cascade ...

  13. 76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment

    Science.gov (United States)

    2011-03-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 447897), the Office of...

  14. Constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to study the constraints of Micro Hydroelectric Power Plants (MHPPs) installed in the West Region of Cameroon. The study was carried out between January 2005 and December 2008 and is related to water conveyance structures, production facilities; transportation and distribution ...

  15. 76 FR 45249 - Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting

    Science.gov (United States)

    2011-07-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting On August 5, 2011, Office of Energy Projects staff may participate in a public meeting hosted by the U.S. Army Corps of Engineers, Baltimore District (Corps) for the...

  16. The Paradox of Restoring Native River Landscapes and Restoring Native Ecosystems in the Colorado River System

    Science.gov (United States)

    Schmidt, J. C.

    2014-12-01

    Throughout the Colorado River basin (CRb), scientists and river managers collaborate to improve native ecosystems. Native ecosystems have deteriorated due to construction of dams and diversions that alter natural flow, sediment supply, and temperature regimes, trans-basin diversions that extract large amounts of water from some segments of the channel network, and invasion of non-native animals and plants. These scientist/manager collaborations occur in large, multi-stakeholder, adaptive management programs that include the Lower Colorado River Multi-Species Conservation Program, the Glen Canyon Dam Adaptive Management Program, and the Upper Colorado River Endangered Species Recovery Program. Although a fundamental premise of native species recovery is that restoration of predam flow regimes inevitably leads to native species recovery, such is not the case in many parts of the CRb. For example, populations of the endangered humpback chub (Gila cypha) are largest in the sediment deficit, thermally altered conditions of the Colorado River downstream from Glen Canyon Dam, but these species occur in much smaller numbers in the upper CRb even though the flow regime, sediment supply, and sediment mass balance are less perturbed. Similar contrasts in the physical and biological response of restoration of predam flow regimes occurs in floodplains dominated by nonnative tamarisk (Tamarix spp.) where reestablishment of floods has the potential to exacerbate vertical accretion processes that disconnect the floodplain from the modern flow regime. A significant challenge in restoring segments of the CRb is to describe this paradox of physical and biological response to reestablishment of pre-dam flow regimes, and to clearly identify objectives of environmentally oriented river management. In many cases, understanding the nature of the perturbation to sediment mass balance caused by dams and diversions and understanding the constraints imposed by societal commitments to provide

  17. Trading river services: optimizing dam decisions at the basin scale to improve socio-ecological resilience

    Science.gov (United States)

    Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.

    2017-12-01

    Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our

  18. Roles of Inspecting Engineers during the Early Building Stages of the Necaxa Hydroelectric Complex

    Directory of Open Access Journals (Sweden)

    Elio Agustín Martínez Miranda

    2006-07-01

    Full Text Available Published literature on the history of electricity in Mexico spans a wide range of subjects and provides information on economic, social, political, technical and even environmental issues. This paper explores a scarcely studied vein, regarding science and education. It refers particularly to the Mexican engineers who, acting as Inspecting Engineers, participated in one of the largest hydroelectric systems of Mexico and Latin America, the Necaxa Hydroelectric Complex, and tries to answer questions such  as: what was their role?; where and what did they study?; were there any electrical engineers?; did they take any course in electricity or hydraulics?; did they apply this knowledge?; did they form part of a scientific community?; did they teach?

  19. Assessing and optimising flood control options along the Arachthos river floodplain (Epirus, Greece)

    Science.gov (United States)

    Drosou, Athina; Dimitriadis, Panayiotis; Lykou, Archontia; Kossieris, Panagiotis; Tsoukalas, Ioannis; Efstratiadis, Andreas; Mamassis, Nikos

    2015-04-01

    We present a multi-criteria simulation-optimization framework for the optimal design and setting of flood protection structures along river banks. The methodology is tested in the lower course of the Arachthos River (Epirus, Greece), downstream of the hydroelectric dam of Pournari. The entire study area is very sensitive, particularly because the river crosses the urban area of Arta, which is located just after the dam. Moreover, extended agricultural areas that are crucial for the local economy are prone to floods. In the proposed methodology we investigate two conflicting criteria, i.e. the minimization of flood hazards (due to damages to urban infrastructures, crops, etc.) and the minimization of construction costs of the essential hydraulic structures (e.g. dikes). For the hydraulic simulation we examine two flood routing models, named 1D HEC-RAS and quasi-2D LISFLOOD, whereas the optimization is carried out through the Surrogate-Enhanced Evolutionary Annealing-Simplex (SE-EAS) algorithm that couples the strengths of surrogate modeling with the effectiveness and efficiency of the EAS method.

  20. To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

    Directory of Open Access Journals (Sweden)

    V. Kh. Nasibov

    2006-01-01

    Full Text Available The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

  1. Ecological aspects of the sandfly fauna (Diptera, Psychodidae in an American cutaneous leishmaniasis endemic area under the influence of hydroelectric plants in Paranapanema river, State of Paraná, Brazil

    Directory of Open Access Journals (Sweden)

    Mariza Fordellone Rosa Cruz

    2012-08-01

    Full Text Available INTRODUCTION: An epidemiological study was undertaken to identify determinant factors in the occurrence of American cutaneous leishmaniasis in areas under the influence of hydroelectric plants in Paranapanema river, State of Paraná, Brazil. The ecological aspects of the phlebotomine fauna were investigated. METHODS: Sandflies were sampled with automatic light traps from February 2004 to June 2006 at 25 sites in the urban and rural areas of Itambaracá, and in Porto Almeida and São Joaquim do Pontal. RESULTS: A total of 3,187 sandflies of 15 species were captured. Nyssomyia neivai predominated (34.4%, followed by Pintomyia pessoai (32.6%, Migonemyia migonei (11.6%, Nyssomyia whitmani (8.8%, and Pintomyia fischeri (2.7%, all implicated in the transmission of Leishmania. Males predominated for Ny. neivai, and females for the other vector species, with significant statistical differences (p < 0.001. Nyssomyia neivai, Pi. pessoai, Ny. whitmani, Brumptomyia brumpti, Mg. migonei, and Pi. fischeri presented the highest values for the Standardized Species Abundance Index (SSAI. The highest frequencies and diversities were found in the preserved forest in Porto Almeida, followed by forests with degradation in São Joaquim do Pontal and Vila Rural. CONCLUSIONS: Sandflies were captured in all localities, with the five vectors predominating. Ny. neivai had its highest frequencies in nearby peridomestic environments and Pi. pessoai in areas of preserved forests. The highest SSAI values of Ny. neivai and Pi. pessoai reflect their wider dispersion and higher frequencies compared with other species, which seems to indicate that these two species may be transmitting leishmaniasis in the area.

  2. The renewal of hydroelectric concessions, an opportunity for France and its territories

    International Nuclear Information System (INIS)

    Thibault, Benjamin

    2017-01-01

    After having recalled that the legal framework for hydroelectric concessions is based on a law adopted in 1919, the author outlines that the opening to competition has in fact emerged at the beginning of the 2000's under the influence of the European Commission. The author indicates and comments various measures implemented regarding the destiny of concessions reaching their expiration date. In this respect, the recent law related to energy transition and for a green growth created an actual possibility of an opening to competition of these concessions. The author comments the content of this law, and its conditions of application. After having outlined that these evolutions have finally built up a complete framework, the author outlines how this opening to competition for hydroelectric concessions can be an opportunity, for example for the development of a modern governance at the local level, and for a better implementation of energy transition

  3. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  4. Gravel-bed river floodplains are the ecological nexus of glaciated mountain landscapes

    Science.gov (United States)

    Hauer, F. Richard; Locke, Harvey; Dreitz, Victoria; Hebblewhite, Mark; Lowe, Winsor; Muhlfeld, Clint C.; Nelson, Cara; Proctor, Michael F.; Rood, Stewart B.

    2016-01-01

    Gravel-bed river floodplains in mountain landscapes disproportionately concentrate diverse habitats, nutrient cycling, productivity of biota, and species interactions. Although stream ecologists know that river channel and floodplain habitats used by aquatic organisms are maintained by hydrologic regimes that mobilize gravel-bed sediments, terrestrial ecologists have largely been unaware of the importance of floodplain structures and processes to the life requirements of a wide variety of species. We provide insight into gravel-bed rivers as the ecological nexus of glaciated mountain landscapes. We show why gravel-bed river floodplains are the primary arena where interactions take place among aquatic, avian, and terrestrial species from microbes to grizzly bears and provide essential connectivity as corridors for movement for both aquatic and terrestrial species. Paradoxically, gravel-bed river floodplains are also disproportionately unprotected where human developments are concentrated. Structural modifications to floodplains such as roads, railways, and housing and hydrologicaltering hydroelectric or water storage dams have severe impacts to floodplain habitat diversity and productivity, restrict local and regional connectivity, and reduce the resilience of both aquatic and terrestrial species, including adaptation to climate change. To be effective, conservation efforts in glaciated mountain landscapes intended to benefit the widest variety of organisms need a paradigm shift that has gravel-bed rivers and their floodplains as the central focus and that prioritizes the maintenance or restoration of the intact structure and processes of these critically important systems throughout their length and breadth.

  5. Distribution of Major and Trace Elements in a Tropical Hydroelectric Reservoir in Sarawak, Malaysia.

    Science.gov (United States)

    Sim, Siong Fong; Ling, Teck Yee; Nyanti, Lee; Ean Lee, Terri Zhuan; Mohd Irwan Lu, Nurul Aida Lu; Bakeh, Tomy

    2014-01-01

    This paper reports the metals content in water, sediment, macroalgae, aquatic plant, and fish of Batang Ai Hydroelectric Reservoir in Sarawak, Malaysia. The samples were acid digested and subjected to atomic absorption spectrometry analysis for Na, K, Mn, Cr, Ni, Zn, Mg, Fe, Sn, Al, Ca, As, Se, and Hg. The total Hg content was analysed on the mercury analyser. Results showed that metals in water, sediment, macroalgae, aquatic plant, and fish are distinguishable, with sediment and biota samples more susceptible to metal accumulation. The distributions of heavy metals in water specifically Se, Sn, and As could have associated with the input of fish feed, boating, and construction activities. The accumulation of heavy metals in sediment, macroalgae, and aquatic plant on the other hand might be largely influenced by the redox conditions in the aquatic environment. According to the contamination factor and the geoaccumulation index, sediment in Batang Ai Reservoir possesses low risk of contamination. The average metal contents in sediment and river water are consistently lower than the literature values reported and well below the limit of various guidelines. For fishes, trace element Hg was detected; however, the concentration was below the permissible level suggested by the Food and Agriculture Organization.

  6. EDM - A model for optimising the short-term power operation of a complex hydroelectric network

    International Nuclear Information System (INIS)

    Tremblay, M.; Guillaud, C.

    1996-01-01

    In order to optimize the short-term power operation of a complex hydroelectric network, a new model called EDM was added to PROSPER, a water management analysis system developed by SNC-Lavalin. PROSPER is now divided into three parts: an optimization model (DDDP), a simulation model (ESOLIN), and an economic dispatch model (EDM) for the short-term operation. The operation of the KSEB hydroelectric system (located in southern India) with PROSPER was described. The long-term analysis with monthly time steps is assisted by the DDDP, and the daily analysis with hourly or half-hourly time steps is performed with the EDM model. 3 figs

  7. Pike Esox Lucius Distribution and Feeding Comparisons in Natural and Historically Channelized River Sections

    Directory of Open Access Journals (Sweden)

    Ivanovs Kaspars

    2016-12-01

    Full Text Available During the last century a large portion of small and medium-sized rivers in Latvia were channelized, hydroelectric power stations were also built, which led to changes in the hydrodynamic conditions, geomorphological structure, as well as a change in the fish fauna. Fish are an integral part of any community in natural or man-made bodies of water. They actively participate in maintaining the system, balancing/equilibrium, energy, substance transformation and biomass production. They are able to influence other organisms in the ecosystem in which they live. The aim of the paper “Pike distribution and feeding comparisons in natural and historically channelized river sections” is to find out what pike feed on in different environments in Latvian rivers, such as natural and straightened river sections, as well as what main factors determine the composition of their food. Several points were assessed during the course of the study: the impact of environmental conditions on the feeding habits and the distribution of pike; the general feeding habits of predators in Latvian rivers; the feeding differences of predators in natural and straightened river sections; and lastly, rhithral and pothamal habitats were compared. The study was based on data from 2014 and 2015 on fish fauna monitoring. During the study, 347 pike were collected from 136 plots using electrofishing method.

  8. Pike Esox Lucius Distribution and Feeding Comparisons in Natural and Historically Channelized River Sections

    Science.gov (United States)

    Ivanovs, Kaspars

    2016-12-01

    During the last century a large portion of small and medium-sized rivers in Latvia were channelized, hydroelectric power stations were also built, which led to changes in the hydrodynamic conditions, geomorphological structure, as well as a change in the fish fauna. Fish are an integral part of any community in natural or man-made bodies of water. They actively participate in maintaining the system, balancing/equilibrium, energy, substance transformation and biomass production. They are able to influence other organisms in the ecosystem in which they live. The aim of the paper "Pike distribution and feeding comparisons in natural and historically channelized river sections" is to find out what pike feed on in different environments in Latvian rivers, such as natural and straightened river sections, as well as what main factors determine the composition of their food. Several points were assessed during the course of the study: the impact of environmental conditions on the feeding habits and the distribution of pike; the general feeding habits of predators in Latvian rivers; the feeding differences of predators in natural and straightened river sections; and lastly, rhithral and pothamal habitats were compared. The study was based on data from 2014 and 2015 on fish fauna monitoring. During the study, 347 pike were collected from 136 plots using electrofishing method.

  9. THE UTILIZATION OF THE WATER RESOURCES OF NISTRU RIVER WITHIN THE REPUBLIC OF MOLDOVA

    Directory of Open Access Journals (Sweden)

    V. MOCREAC

    2016-03-01

    Full Text Available On the basis of the studies regarding the water funds, the regimes and characteristics of the flow of river Nistru, those internal larger and smaller ones, taking into consideration what basins exist and the ones with perspective can demonstrate the hydroenergetic potential values of the Republic of Moldova currently and for an extended period of time.The basic variant of the scheme of arrangement on Nistru r. on the basis of the requirements of today’s impact on the environment, the ecological flows, hydroenergetic equipments chosen for the parameters of sufficient operation, and the hydrotechnical unit must have an appearance of a complex utilization. The assurances of the flows and head of the hydro-electric plants with operation in cascade on rivers is caused by the strength of given data and the hydrologic calculations after interstate normatives applied now.

  10. Benefits of fish passage and protection measures at hydroelectric projects

    International Nuclear Information System (INIS)

    Cada, G.F.; Jones, D.W.

    1993-01-01

    The US Department of Energy's Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations

  11. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  12. Report on the renewal of the hydro-electric concessions; Rapport sur le renouvellement des concessions hydroelectriques

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  13. Dynamics of Total Microcystin LR Concentration in Three Subtropical Hydroelectric Generation Reservoirs in Uruguay, South America.

    Science.gov (United States)

    González-Piana, Mauricio; Fabián, Daniel; Piccardo, Andrea; Chalar, Guillermo

    2017-10-01

    This study analyzed the temporal dynamics of total microcystin LR concentrations between the years of 2012 and 2015 in the Bonete, Baygorria and Palmar hydroelectric generation reservoirs in the central region of the Negro River, Uruguay. The three reservoirs showed differents total microcystin LR concentration, with no significant differences among them. Over 20 sampling dates, the three reservoirs exhibited total microcystin LR concentrations on eight occasions that corresponded to a slight to moderate human health risk according to WHO guideline values for recreational waters. By determining the concentration of microcystin LR in cyanobacterial biomass, we identified cyanobacterial populations that occurred over time with varying degrees of toxin production (maximal 85.4 µg/mm 3 ). The microcystin LR concentration in Bonete was positively correlated with temperature (r = 0.587) and cyanobacterial biomass (r = 0.736), in Baygorria with cyanobacterial biomass (r = 0.521), and in Palmar with temperature (r = 0.500) and negatively correlated with ammonia (r = -0.492). Action is needed to reduce the presence of toxic cyanobacteria in these systems. A decrease in the use of agrochemicals and management changes in the reservoir basins could be successful long-term measures.

  14. Small-scale hydroelectric power plant of Passo do Inferno automation system; Sistema de automatizacao da PCH Passo do Inferno

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Luiz C. Lisboa; Moralles, Reni; Quadros, Carlos A.D.; Martiny, Raul; Moehlecke, Juarez E.; Costa, Nelson D. da; Cesar, Rogerio L.; Santos, Sergio S.; Basei, Eleu Natal [Companhia Estadual de Energia Eletrica do Estado do Rio Grande do Sul, Porto Alegre, RS (Brazil)

    1993-12-31

    This work introduces the automation system brought into the 1,7 MVA small-scale hydroelectric power plant of Passo do Inferno, state of Rio Grande do Sul, Brazil. The following systems are presented: supervision, security and generation control, as well as the program and the controller. In this work, it is focused the generation control system, as a new outfitted system in small-scale hydroelectric power plants 3 figs.

  15. Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Bulan, L.C.

    2011-01-01

    Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204 m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It then delves into six sets of barriers in the technical, economic, political, legal and regulatory, social, and environmental realms. We find that Bakun illustrates how centralized energy megaprojects, while ostensibly championed for reasons of economies of scale and the ability to bring about transformational change in the shortest period of time, often fail to address broader development goals such as fighting energy poverty and improving the livelihoods of the local communities they are supposed to serve. - Highlights: → Bakun Dam is concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. → The project faces technical, economic, political, legal and regulatory, social, and environmental barriers. → We conclude the project will fail to fight energy poverty or improve the livelihoods of local populations.

  16. Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.sg [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore); Bulan, L.C. [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore)

    2011-09-15

    Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204 m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It then delves into six sets of barriers in the technical, economic, political, legal and regulatory, social, and environmental realms. We find that Bakun illustrates how centralized energy megaprojects, while ostensibly championed for reasons of economies of scale and the ability to bring about transformational change in the shortest period of time, often fail to address broader development goals such as fighting energy poverty and improving the livelihoods of the local communities they are supposed to serve. - Highlights: > Bakun Dam is concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. > The project faces technical, economic, political, legal and regulatory, social, and environmental barriers. > We conclude the project will fail to fight energy poverty or improve the livelihoods of local populations.

  17. 76 FR 76709 - Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-12-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12642-003 North Carolina] Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's...

  18. Viewpoint – Brazil’s Madeira River Dams: A Setback for Environmental Policy in Amazonian Development

    Directory of Open Access Journals (Sweden)

    Philip Martin Fearnside

    2014-02-01

    Full Text Available Decisions on hydroelectric dam construction will be critical in shaping the future of Amazonia, where planned dams would convert most tributaries into chains of reservoirs. The Santo Antônio and Jirau dams, now nearing completion on the Madeira River, have created dangerous precedents in a trend towards weakening environmental protection in Brazil. Political appointees have overruled the technical staff of the Brazilian Institute for the Environment and Renewable Natural Resources (IBAMA, which is responsible for evaluating the environmental impact study (EIA and for licensing dams. Installation licences were granted without satisfying many of the 'conditions' that had been established as prerequisites. This feature and several others of the licensing process for the Madeira River dams have now been repeated in licensing the controversial Belo Monte Dam on the Xingu River. Brazil plans to build 30 large dams in its Amazon region in a decade, and others are to be financed and built by Brazil in Peru, Bolivia, Ecuador and Guyana. These plans affect virtually all water resources in an area larger than Western Europe. The Madeira River dams indicate the need to reform the decision-making process in Brazil.

  19. Parasitism by Monogenoidea in Piaractus mesopotamicus (Characiformes, Characidae cultivated in Paraná River (Brazil

    Directory of Open Access Journals (Sweden)

    M. S. L. Leão

    2017-05-01

    Full Text Available Abstract This study investigated the occurrence, prevalence, mean abundance and mean intensity of monogenoidean parasites in Piaractus mesopotamicus farmed in cages in the reservoir of the Itaipu Hydroelectric Power Station, Paraná River, Brazil. The parasite distribution pattern and the correlation of prevalence and abundance with the total length of hosts were also investigated. Four monogenoidean species were collected: Anacanthorus penilabiatus, A. toledoensis, Mymarothecium ianwhitingtoni and M. viatorum. All the parasites collected in P. mesopotamicus showed the typical aggregated distribution pattern, and the abundance and the prevalence did not shown any correlation with the total length of hosts.

  20. Effects of hyporheic exchange flows on egg pocket water temperature in Snake River fall Chinook salmon spawning areas

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, T. P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geist, D. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Arntzen, E. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Abernethy, C. S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2004-09-01

    The development of the Snake River hydroelectric system has affected fall Chinook salmon smolts by shifting their migration timing to a period (mid- to late-summer) when downstream reservoir conditions are unfavorable for survival. Subsequent to the Snake River Chinook salmon fall-run Evolutionary Significant Unit being listed as Threatened under the Endangered Species Act, recovery planning has included changes in hydrosystem operations (e.g., summer flow augmentation) to improve water temperature and flow conditions during the juvenile Chinook salmon summer migration period. In light of the limited water supplies from the Dworshak reservoir for summer flow augmentation, and the associated uncertainties regarding benefits to migrating fall Chinook salmon smolts, additional approaches for improved smolt survival need to be evaluated. This report describes research conducted by the Pacific Northwest National Laboratory (PNNL) that evaluated relationships among river discharge, hyporheic zone characteristics, and egg pocket water temperature in Snake River fall Chinook salmon spawning areas. This was a pilot-scale study to evaluate these relationships under existing operations of Hells Canyon Dam (i.e., without any prescribed manipulations of river discharge) during the 2002–2003 water year.

  1. 77 FR 59389 - Hawks Nest Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-09-27

    .... Name of Project: Hawks Nest Hydroelectric Project (P-2512-069) and Glen Ferris Hydroelectric Project (P... of Gauley Bridge, and Glen Ferris Hydroelectric Project is on the Kanawha River in the vicinity of the Town of Glen Ferris, both within Fayette County, West Virginia. The projects do not affect federal...

  2. The non-fisheries biological resources of the Hanford reach of the Columbia River

    International Nuclear Information System (INIS)

    Rickard, W.H.; Hanson, W.C.; Fitzner, R.E.

    1982-01-01

    The Hanford Reach is the only undammed segment of the Columbia River in the United States upstream from Bonneville Dam. The non-agricultural and non-recreational land-use policies imposed by the Department of Energy have permitted the Hanford Site to function as a refugium for wildlife for 35 years. The protection offered by the Hanford Site has been especially important for the Bald Eagle (Haliaeetus leurocephalus), mule deer (Odocileus hemionus), coyote (Canis latrans), and resident Great Basin Canada Goose (Branta canadensis moffitti). Island habitats are especially important for nesting geese and for mule deer fawning. Coyotes are important predators upon nesting geese and mule deer fawns. Salmon carcasses are an important winter food for Bald Eagles. Riparian plant communities along the Columbia River have been changing in response to changing water level fluctuations largely regulated by power generation schedules at upstream hydroelectric dams. There are no studies presently established to record the response of Columbia River shoreline plant communities to these kinds of fluctuating water levels. The existing information is summarized on birds and mammals closely allied with the Hanford Reach of the Columbia River. High trophic level wild animals are discussed as indicators of chemical contamination of food chains

  3. South Fork Snake River/Palisades Wildlife Mitigation Project: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    BPA proposes to fund the implementation of the South Fork Snake River Programmatic Management Plan to compensate for losses of wildlife and wildlife habitat due to hydroelectric development at Palisades Dam. The Idaho Department of Fish and Game drafted the plan, which was completed in May 1993. This plan recommends land and conservation easement acquisition and wildlife habitat enhancement measures. These measures would be implemented on selected lands along the South Fork of the Snake River between Palisades Dam and the confluence with the Henry`s Fork, and on portions of the Henry`s Fork located in Bonneville, Madison, and Jefferson Counties, Idaho. BPA has prepared an Environmental Assessment evaluating the proposed project. The EA also incorporates by reference the analyses in the South Fork Snake River Activity/Operations Plan and EA prepared jointly in 1991 by the Bureau of Land Management and the Forest Service. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  4. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  5. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... associated with the Dallas Creek Project; and the anticipated return on investment. If there are additional... entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing... and interested entities to discuss Western's potential marketing of hydropower. FOR FURTHER...

  6. Columbia River System Operation Review final environmental impact statement. Appendix G: Land use and development

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. The SOR began in early 1990, prior to the filing of petitions for endangered status for several salmon species under the Endangered Species Act. The comprehensive review of Columbia River operations encompassed by the SOR was prompted by the need for Federal decisions to (1) develop a coordinated system operating strategy (SOS) for managing the multiple uses of the system into the 21st century; (2) provide interested parties with a continuing and increased long-term role in system planning (Columbia River Regional Forum); (3) renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA), a contractual arrangement among the region's major hydroelectric-generating utilities and affected Federal agencies to provide for coordinated power generation on the Columbia River system; and (4) renew or develop new Canadian Entitlement Allocation Agreements. The review provides the environmental analysis required by the National Environmental Policy Act (NEPA). This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR

  7. Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant 'Djerdap 1' backwater.

    Science.gov (United States)

    Pajic, P; Andjelic, L; Urosevic, U; Polomcic, D

    2014-01-01

    Construction of the hydroelectric power plant (HPP) 'Djerdap 1' formed a backwater effect on the Danube and its tributaries, which had an inevitable influence on groundwater level, causing it to rise and thus creating additional threats to all melioration areas on more than 300 km of the Danube riversides, as well as on the riversides of its tributaries: the Sava (100 km) and the Tisa (60 km). In this paper, the HPP 'Djerdap 1' backwater effect on some characteristic melioration areas (34 in all) has been analyzed. In most of these areas intensive agricultural activity has always been present. An assessment of agricultural production damage was carried out by complex hydrodynamic calculations (60 calculation profiles) for different backwater regimes, with the aim to precisely quantify the HPP 'Djerdap 1' backwater effect on groundwater piezometric levels. Combining them with complex agroeconomic analyses, the aim is to quantify agricultural production damage and to consider the perspective of melioration area users. This method, which combines two different, but compatible, aspects of the melioration area threat assessment (hydrodynamic and agroeconomic), may present a quality base for further agricultural production threat assessment on all melioration areas on the Danube riversides, with the final aim to consider the economic effects and the importance of its further protection.

  8. River ice implications related to water power production in Norway

    Energy Technology Data Exchange (ETDEWEB)

    Asvall, R.P. [Norwegian Water Resources and Energy Directorate, Oslo (Norway). Hydrology Dept.

    2009-07-01

    Nearly 99 per cent of the electricity produced in Norway is based on water power. While the period of large power development is over, the current focus lies in developing small hydroelectric power plants. A new market based energy law was implemented in Norway in 1991 to achieve more efficient use of electricity production by means of market forces. Since water regulation influences ice conditions in lakes and rivers, this paper focused on the implications of changes in ice conditions. In Norway, the expected changes in ice conditions are taken into account when issuing permits for water regulations and schemes for water discharge because some waterways are used as winter roads. Follow-up includes both close and long term observations and measurements. The impact of variable price on power was also discussed, with particular reference to ice conditions in cases where water discharge occurs on rivers. This paper summarized selected ice problems and how they have been handled. The paper also included a summary of anticipated climatic changes relevant to ice conditions.

  9. Mattagami River Lake sturgeon entrainment : Little Long generating station facilities

    International Nuclear Information System (INIS)

    Seyler, J.; Evers, J.; McKinley, S.; Evans, R.R.; Prevost, G.; Carson, R.; Phoenix, D.

    1996-01-01

    This project and publication is the result of a collaborative effort by other Large River Ecosystem Unit of Northeast Science (NEST), Ontario Hydro in Kapuskasing, and the New Post First Nation in Cochrane, Ontario, designed to investigate potential solutions to minimize or eliminate the problem of trapped lake sturgeon in the Adam Creek Diversion. The Adam Creek Dam is used to divert excess water from the Mattagami River hydroelectric complex which consists of the Little Long, Smoky Falls, Harmon and Kipling generating stations. The lake sturgeon entrainment problem in the area was discovered in 1990. Potential solutions to the problem include the redirection of flows to mainstream, the placement of a rope barrier, electrical deterrents, physical/electrical guidance systems, sound deterrents, gate modifications, and the continued relocation of fish. The advantages and disadvantages of each of these potential solutions are discussed. Results of the analysis indicated that perceptual and physical barriers have the greatest potential to minimize lake sturgeon entrainment in Adam Creek. 25 refs., 2 tabs., 3 figs., 6 appendices

  10. River ice implications related to water power production in Norway

    International Nuclear Information System (INIS)

    Asvall, R.P.

    2009-01-01

    Nearly 99 per cent of the electricity produced in Norway is based on water power. While the period of large power development is over, the current focus lies in developing small hydroelectric power plants. A new market based energy law was implemented in Norway in 1991 to achieve more efficient use of electricity production by means of market forces. Since water regulation influences ice conditions in lakes and rivers, this paper focused on the implications of changes in ice conditions. In Norway, the expected changes in ice conditions are taken into account when issuing permits for water regulations and schemes for water discharge because some waterways are used as winter roads. Follow-up includes both close and long term observations and measurements. The impact of variable price on power was also discussed, with particular reference to ice conditions in cases where water discharge occurs on rivers. This paper summarized selected ice problems and how they have been handled. The paper also included a summary of anticipated climatic changes relevant to ice conditions.

  11. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    Science.gov (United States)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  12. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  13. Urban Panorama Tourism Planning A View From River Tour Course In Post-Three Gorges Era

    Directory of Open Access Journals (Sweden)

    Wei Jia Tian

    2012-12-01

    Full Text Available The upstream cities of Yangtze River have been witnessing significant transforming since the beginning of the construction of the Three Gorges hydroelectric dam project. Chongqing Port Authority had its opportunity to alternate the river tourism strategy from being the upstream terminal of the golden route into creating a particular cruise course towards perceiving the panorama of continuous elevation of mountainous city, at the same time, promoting the renovation of the urban design so as to revival the typical mountain-river vista. This paper bases on the panoramic research of Chongqing peninsula; discusses the characteristic aspects of the three-dimension sightseeing of the mountainous city on the cruise route, which widely exists in the Three Gorges region as well. And this method is different from the two dimensional approach of skyline analysis which is more suitable for the topographic area. The achieved work can offer the tourism-related sectors a sustainable assistance to deal with “tourbanism” topics in the urban regeneration process in the Three Gorges regions.

  14. Rivers of Energy: The Hydropower Potential. Worldwatch Paper No. 44.

    Science.gov (United States)

    Deudney, Daniel

    Described are the history, current status and future potential of hydroelectric power in the world. Issues discussed include the environmental and social impacts of dam construction, and the use of small-scale hydroelectric installations in developing nations. Also considered are hydroelectric development of the world's remote regions, the need to…

  15. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  16. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant

    Directory of Open Access Journals (Sweden)

    Amevi Acakpovi

    2016-12-01

    Conclusion: The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  17. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  18. Science evaluation of the environmental impact statement for the lower Churchill hydroelectric generation project to identify deficiencies with respect to fish and fish habitat

    International Nuclear Information System (INIS)

    Clarke, K.

    2009-01-01

    This report evaluated an environmental impact statement (EIS) submitted by a company proposing to develop a hydroelectric generation project in the lower Churchill River in Labrador. Construction of the facilities will alter the aquatic environment of the river as well as the receiving environment of lakes. The alterations are expected to have an impact on fish and fish habitats. The study evaluated the methods used to describe and predict impacts in the aquatic environment and examined models used for predictions in order to assess uncertainty levels. Results of the evaluation demonstrated that additional efforts are needed to document local knowledge of fish use and fish habitat, and that the magnitude of expected changes to fish habitat must be considered relative to the loss of fish habitat. The study also highlighted areas within the EIS that will require further clarification. A number of the studies used in the EIS had small sample sizes that increased the uncertainty of predictions made using the data. Uncertainties related to potential changes in flushing rates and morphological features was also needed. The impact of direct fish mortality from turbine operations was not addressed in a population context, and further information is needed to evaluate potential project-related effects on a species-by-species basis. 3 refs., 4 tabs.

  19. [Malaria and hematological aspects among residents to be impacted by reservoirs for the Santo Antônio and Jirau Hydroelectric Power Stations, Rondônia State, Brazil].

    Science.gov (United States)

    Katsuragawa, Tony Hiroshi; Cunha, Roberto Penna de Almeida; de Souza, Daniele Cristina Apoluceno; Gil, Luiz Herman Soares; Cruz, Rafael Bastos; Silva, Alexandre de Almeida E; Tada, Mauro Shugiro; da Silva, Luiz Hildebrando Pereira

    2009-07-01

    In Rondônia State, Brazil, two new hydroelectric plants, Santo Antônio and Jirau, are scheduled for construction on the Madeira River, upriver from the State capital, Porto Velho. The current study analyzes malaria prevalence before the construction and provides information on the possible impacts of malaria burden related to the influx of thousands of persons attracted by direct and indirect employment opportunities. According to the findings, malaria is present throughout the region, with varying prevalence rates. The existence of potential asymptomatic malaria carriers among the local population may be epidemiologically relevant and should be considered in the malaria control programs organized by public authorities and companies responsible for building the power plants, aimed at early diagnosis and treatment, vector control, water supply, and infrastructure in the urban areas.

  20. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  1. Survival of migrating salmon smolts in large rivers with and without dams.

    Directory of Open Access Journals (Sweden)

    David W Welch

    2008-10-01

    Full Text Available The mortality of salmon smolts during their migration out of freshwater and into the ocean has been difficult to measure. In the Columbia River, which has an extensive network of hydroelectric dams, the decline in abundance of adult salmon returning from the ocean since the late 1970s has been ascribed in large measure to the presence of the dams, although the completion of the hydropower system occurred at the same time as large-scale shifts in ocean climate, as measured by climate indices such as the Pacific Decadal Oscillation. We measured the survival of salmon smolts during their migration to sea using elements of the large-scale acoustic telemetry system, the Pacific Ocean Shelf Tracking (POST array. Survival measurements using acoustic tags were comparable to those obtained independently using the Passive Integrated Transponder (PIT tag system, which is operational at Columbia and Snake River dams. Because the technology underlying the POST array works in both freshwater and the ocean, it is therefore possible to extend the measurement of survival to large rivers lacking dams, such as the Fraser, and to also extend the measurement of survival to the lower Columbia River and estuary, where there are no dams. Of particular note, survival during the downstream migration of at least some endangered Columbia and Snake River Chinook and steelhead stocks appears to be as high or higher than that of the same species migrating out of the Fraser River in Canada, which lacks dams. Equally surprising, smolt survival during migration through the hydrosystem, when scaled by either the time or distance migrated, is higher than in the lower Columbia River and estuary where dams are absent. Our results raise important questions regarding the factors that are preventing the recovery of salmon stocks in the Columbia and the future health of stocks in the Fraser River.

  2. Summary of thirty years of environmental knowledge acquired by Hydro-Quebec in large hydroelectric projects in northern regions; Synthese de trente annees de connaissances environnementales acquises par Hydro-Quebec reliees aux grands amenagements hydroelectriques en milieu nordique

    Energy Technology Data Exchange (ETDEWEB)

    Demers, C. [Hydro-Quebec, Montreal, PQ (Canada)

    2003-12-01

    Power generation in Canada is a provincial responsibility. Since Quebec does not possess petroleum, natural gas or coal deposits, the Quebec government decided, in the 1970s, to develop hydroelectric resources in the northern regions of the province. This paper presents a brief historical overview of the hydroelectric development of the La Grande River project, also referred to as the James Bay project. Located approximately 1000 kilometres north of Montreal, the La Grande project lies in a humid continental climate with an average winter temperature of - 23 Celsius and an average summer temperature of 14 Celsius. The construction of the dam was not preceded by an environmental impact assessment, but environmental data was collected for the first time before construction began. It was an opportunity for all environmental sciences to develop inventory methodologies and analysis techniques specific to northern regions applicable to hydroelectric development. This project also required the signing of the James Bay and Northern Quebec Agreement by the governments of Canada and Quebec, Hydro-Quebec, and the Crees and Inuit of Quebec. The Agreement covers an area of 1 million square kilometres. As a result, Hydro-Quebec has become, over the past 30 years, a leader in environmental assessments and studies in the province. In northern Quebec, a hydroelectric reservoir constitutes an ecosystem whose biological productivity is comparable to a natural lake or ecosystem of equal area. During the first 5 years after flooding, reservoirs possess water quality slightly below that of a natural lake, but still favorable to biological development. The flooding of areas and the subsequent organic degradation promote mercury methylation and its accumulation in the food chain. The emissions of greenhouse gases by northern reservoirs are minimal compared to tropical reservoirs. The fauna in northern Quebec suffered habitat loss, but none became endangered. No Aboriginal community

  3. The adventure of hydroelectricity must continue

    International Nuclear Information System (INIS)

    Gravel, C.

    1997-01-01

    An interview with Andre Caille, president and CEO of Hydro-Quebec was presented. The interview focussed on the hydroelectric potential of Hydro-Quebec and open access to the American wholesale market. Hydro-Quebec has the capability to produce 160 to 170 terawatt hours of energy per year which is enough to meet all of Quebec''s needs and to export 12 to 15 per cent. According to M. Caille, research in the field of superconductivity would significantly benefit Hydro-Quebec, since the utility is responsible for 107,000 kilometers of transmission lines. If transmission line losses along those lines could be reduced, power stations could be built even farther from markets. With respect to pricing, Hydro-Quebec continues to sell electricity at regulated prices in Quebec, however, export prices to the U.S. are market driven

  4. Transboundary water resources management and livelihoods: interactions in the Senegal river

    Science.gov (United States)

    Bruckmann, Laurent; Beltrando, Gérard

    2016-04-01

    In Sub-Saharan Africa, 90 % of wetlands provide ecosystem services to societies, especially for agriculture and fishing. However, tropical rivers are increasingly regulated to provide hydroelectricity and irrigated agriculture. Modifications of flows create new hydrological conditions that affect floodplains ecology and peoples' livelihoods. In the Senegal river valley, large dams were built during the 1980's to secure water resources after a decade of water scarcity in the 1970's: Manantali in the upper basin with a reservoir of 12km3 and Diama close to estuary to avoid saltwater intrusion during dry season. Senegal river water resources are known under the supervision of Senegal River Basin Development Organization (OMVS), which defines water allocation between different goals (electricity, irrigation, traditional activities). This study, based on the concept of socio-hydrology, analyses socio-ecological changes following thirty years of dam management. The work enlightens adaptation mechanisms of livelihoods from people living along the river floodplain and feedback on water ressources. The study uses a mixed method approach, combining hydrological analyses, literature review and data collection from surveys on stakeholders and key informants level in the middle Senegal valley. Our results suggest that in all the Senegal river valley, socio-ecological changes are driven by new hydrological conditions. If dam management benefit for peoples with electrification and development of an irrigated agriculture, it has also emphasized the floodplain degradation. Flooded area has decline and are more irregular, causing an erosion of floodplain supporting services (traditional activities as fishing, grazing and flood-recession agriculture). These conditions reduce peoples' livelihood possibilities and irrigation is the only regular activity. As a feedback, irrigated agriculture increases withdrawals in the river and, recently, in aquifers posing a new uncertainty on water

  5. The Dokka delta - consequences of water power development in the River Dokka; Dokka-deltaet - ferskvannsbiologiske konsekvenser av kraftutbyggingen i Dokka-vassdraget

    Energy Technology Data Exchange (ETDEWEB)

    Halvorsen, Gunnar; Sloreid, Svein-Erik; Walseng, Bjoern

    1997-11-01

    The report concerns an investigation done in Norway on environmental consequences of hydroelectric power development in the Dokka river. This development has reduced the water flow through the Dokka delta to about 50% of its natural level. The biological effect of the reduction has been studied in the period from 1987 to 1990, comprising two years before and two years after the reduction. Sedimentation, water chemistry, planktonic and littoral crustaceans and bottom fauna have been studied. 223 refs., 58 figs., 9 tabs.

  6. Feasibility study of upgrading Byllesby and Buck power plants on the New River in the Commonwealth of Virginia

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    The feasibility of upgrading alternatives of the 66-year-old Byllesby and Buck hydroelectric developments located on the New River in Virginia was investigated. Evaluation of technical, economic and environmental factors led to the conclusion that modernization of the plants could result in an annual generation increase of 20.2 GWh at a cost of $6.1 million and with a benefit-cost ratio of 2.32. The recommended retrofitting includes replacing existing runners with new, more efficiently designed runners, modifying draft tube and wicker gate, and rewinding the generators. (LCL)

  7. Short-term cascaded hydroelectric system scheduling based on chaotic particle swarm optimization using improved logistic map

    Science.gov (United States)

    He, Yaoyao; Yang, Shanlin; Xu, Qifa

    2013-07-01

    In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.

  8. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  9. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  10. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Directory of Open Access Journals (Sweden)

    Maíra Benchimol

    Full Text Available Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  11. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Science.gov (United States)

    Benchimol, Maíra; Peres, Carlos A

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  12. Increased Levels of Harvest and Habitat Law Enforcement and Public Awareness for Anadromous Salmonids and Resident Fish in the Columbia River Basin -- Demonstration Period, 1992--1994, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    NeSmith, Frank (Idaho Department of Fish and Game, Boise, ID); Long, Mack (Montana Department of Fish, Wildlife and Paks, Kalispell, MT); Matthews, Dayne (Washington Department of Fish and Wildlife, Olympia, WA)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin.

  13. Increased levels of harvest and habitat law enforcement and public awareness for anadromous salmonids and resident fish in the Columbia River Basin - Demonstration period, 1992-1994. Final report

    International Nuclear Information System (INIS)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin

  14. Reservoir stratification affects methylmercury levels in river water, plankton, and fish downstream from Balbina hydroelectric dam, Amazonas, Brazil.

    Science.gov (United States)

    Kasper, Daniele; Forsberg, Bruce R; Amaral, João H F; Leitão, Rafael P; Py-Daniel, Sarah S; Bastos, Wanderley R; Malm, Olaf

    2014-01-21

    The river downstream from a dam can be more contaminated by mercury than the reservoir itself. However, it is not clear how far the contamination occurs downstream. We investigated the seasonal variation of methylmercury levels in the Balbina reservoir and how they correlated with the levels encountered downstream from the dam. Water, plankton, and fishes were collected upstream and at sites between 0.5 and 250 km downstream from the dam during four expeditions in 2011 and 2012. Variations in thermal stratification of the reservoir influenced the methylmercury levels in the reservoir and in the river downstream. Uniform depth distributions of methylmercury and oxygen encountered in the poorly stratified reservoir during the rainy season collections coincided with uniformly low methylmercury levels along the river downstream from the dam. During dry season collections, the reservoir was strongly stratified, and anoxic hypolimnion water with high methylmercury levels was exported downstream. Methylmercury levels declined gradually to 200 km downstream. In general, the methylmercury levels in plankton and fishes downstream from the dam were higher than those upstream. Higher methylmercury levels observed 200-250 km downstream from the dam during flooding season campaigns may reflect the greater inflow from tributaries and flooding of natural wetlands that occurred at this time.

  15. Mercury accumulation in bats near hydroelectric reservoirs in Peninsular Malaysia.

    Science.gov (United States)

    Syaripuddin, Khairunnisa; Kumar, Anjali; Sing, Kong-Wah; Halim, Muhammad-Rasul Abdullah; Nursyereen, Muhammad-Nasir; Wilson, John-James

    2014-09-01

    In large man-made reservoirs such as those resulting from hydroelectric dam construction, bacteria transform the relatively harmless inorganic mercury naturally present in soil and the submerged plant matter into toxic methylmercury. Methylmercury then enters food webs and can accumulate in organisms at higher trophic levels. Bats feeding on insects emerging from aquatic systems can show accumulation of mercury consumed through their insect prey. In this study, we investigated whether the concentration of mercury in the fur of insectivorous bat species was significantly higher than that in the fur of frugivorous bat species, sampled near hydroelectric reservoirs in Peninsular Malaysia. Bats were sampled at Temenggor Lake and Kenyir Lake and fur samples from the most abundant genera of the two feeding guilds-insectivorous (Hipposideros and Rhinolophus) and frugivorous (Cynopterus and Megaerops) were collected for mercury analysis. We found significantly higher concentrations of total mercury in the fur of insectivorous bats. Mercury concentrations also differed significantly between insectivorous bats sampled at the two sites, with bats from Kenyir Lake, the younger reservoir, showing higher mercury concentrations, and between the insectivorous genera, with Hipposideros bats showing higher mercury concentrations. Ten bats (H. cf. larvatus) sampled at Kenyir Lake had mercury concentrations approaching or exceeding 10 mg/kg, which is the threshold at which detrimental effects occur in humans, bats and mice.

  16. Hydrological, morphometrical, and biological characteristics of the connecting rivers of the International Great Lakes: a review

    Science.gov (United States)

    Edwards, Clayton J.; Hudson, Patrick L.; Duffy, Walter G.; Nepszy, Stephen J.; McNabb, Clarence D.; Haas, Robert C.; Liston, Charles R.; Manny, Bruce; Busch, Wolf-Dieter N.; Dodge, D.P.

    1989-01-01

    The connecting channels of the Great Lakes are large rivers (1, 200-9, 900 m3 • s-1) with limited tributary drainage systems and relatively stable hydrology (about 2:1 ration of maximum to minimum flow). The rivers, from headwaters to outlet, are the St. Marys, St. Clair, Detroit, Niagara, and St. Lawrence. They share several characteristics with certain other large rivers: the fish stocks that historically congregated for spawning or feeding have been overfished, extensive channel modification have been made, and they have been used as a repository for domestic and industrial wastes and for hydroelectric energy generation. Levels of phosphorus, chlorophyll a, and particulate organic matter increase 3- to 5-fold from the St. Marys River to the St. Lawrence River. Biological communities dependent on nutrients in the water column, such as phytoplankton, periphyton, and zooplankton similarly increase progressively downstream through the system. The standing crop of emergent macrophytes is similar in all of the rivers, reflecting the relatively large nutrient pools in the sediments and atmosphere. Consequently, emergent macrophytes are an important source of organic matter (67% of total primary production) in the nutrient poor waters of the St. Marys River, whereas phytoplankton production dominates (76%) in the enriched St. Lawrence River. Submersed and emergent macrophytes and the associated periphyton are major producers of organic matter in the connecting channels. Another major source of organic matter (measured as ash free dry weight, AFDW) in the Detroit River is sewage, introduced at a rate of 26, 000 t per year. The production of benthos ranges from a low 5.4 g AFDW•m-2 in the Detroit River to a high of 15.5 g AFDW•m-2 in the St. Marys River. The rivers lack the organic transport from riparian sources upstream but receive large amounts of high quality phytoplankton and zooplankton from the Great Lakes.

  17. Water-quality and algal conditions in the North Umpqua River basin, Oregon, 1992-95, and indications for resource management

    Science.gov (United States)

    Anderson, Chauncey W.; Carpenter, Kurt D.

    1998-01-01

    This report describes the results of a synoptic water-quality and algal investigation during July 1995 at 36 stream sites in a 1,350 square-mile area of the North Umpqua River Basin, Oregon. The study area includes a headwaters hydroelectric project area, a Wild and Scenic reach in the main stem immediately downstream, and the watersheds of several major tributaries. Additional data from previous investigations are reviewed, and impacts on water quality in the Wild and Scenic reach from resource management, including forestry and reservoir operations, are inferred where sufficient data exist.

  18. Herpetofauna, Espora Hydroelectric Power Plant, state of Goiás, Brazil.

    Directory of Open Access Journals (Sweden)

    Vaz-Silva, W.

    2007-01-01

    Full Text Available We provide a checklist of the herpetofaunal assemblage from Espora Hydroelectric Power Plant region(UHE Espora, southwestern of the state of Goiás, Brazil. Representatives of 32 amphibian and 71 reptile species wereobtained during faunal monitoring and faunal rescue programs carried out in the study area. The obtained species listand distribution records are here discussed in an attempt to improve the still limited knowledge on Cerradoherpetofaunal assemblages.

  19. Actual state and perspectives of the small hydroelectric plants in Colombia

    International Nuclear Information System (INIS)

    Torres Q, E.; Castillo C, J.J.

    1995-01-01

    In this article, the actual state of the small-scale hydroelectric power plants (PCHs, abbreviations in Spanish) in Colombia in aspects as: Statistic of the water in Colombia, a brief historical review and the characteristics of the PCHs in Colombia, is present. The development PCHs, the executing projects and the actions that has been develop by the INEA (Institute of Nuclear Sciences and the Alternative Energies) is described

  20. Revolutionising landscapes: Hydroelectricity and the heavy industrialisation of society and environment in the Comte de Beauharnois, 1927--1948

    Science.gov (United States)

    Pelletier, Louis-Raphael

    This dissertation analyses the rapid industrialisation of the rural Comte de Beauharnois and the adjacent stretch of the Fleuve Saint-Laurent owing to the construction, between 1929 and 1948, of a gigantic canal for hydroelectricity production and navigation by an electricity corporation called the Beauharnois Light Heat and Power (BLH&P). Using principally the archives of the BLH&P---especially its complaints files and its rich photographic record---this thesis argues that this process exemplifies the finance capitalist reorganisation of the society and ecosystems of the Canadian province of Quebec from the 19th century to the Great Depression. In keeping with recent work in environmental history, the transformation of rural landscapes and a river for heavy industry is described as an important dimension of a revolution in modes of production. More specifically, I argue that, in the case under study, the finance-capitalist reorganisation of Quebec revolved around two central and explicit projects, one social and the other environmental: the grouping of most individuals in an industrial working class without control over the means of production and the reorganisation of rural landscapes into reservoirs of modern energy and industrial natural resources.

  1. Downstream effects of hydropower production on aquatic macroinvertebrate assemblages in two rivers in Costa Rica.

    Science.gov (United States)

    Chaves-Ulloa, Ramsa; Umaña-Villalobos, Gerardo; Springer, Monika

    2014-04-01

    Despite the fact that little is known about the consequences of hydropower production in tropical areas, many large dams (> 15 m high) are currently under construction or consideration in the tropics. We researched the effects of large hydroelectric dams on aquatic macroinvertebrate assemblages in two Costa Rican rivers. We measured physicochemical characteristics and sampled aquatic macroinvertebrates from March 2003 to March 2004 in two dammed rivers, Peñas Blancas and San Lorenzo, as well as in the undammed Chachagua River. Sites above and below the dam had differences in their physicochemical variables, with wide variation and extreme values in variables measured below the dam in the San Lorenzo River. Sites below the dams had reduced water discharges, velocities, and depths when compared with sites above the dams, as well as higher temperatures and conductivity. Sites above dams were dominated by collector-gatherer-scrapers and habitat groups dominated by swimmer-clingers, while sites below dams had a more even representation of groups. In contrast, a comparison between two sites at different elevation in the undammed river maintained a similar assemblage composition. Tributaries might facilitate macroinvertebrate recovery above the turbine house, but the assemblage below the turbine house resembled the one below the dam. A massive sediment release event from the dam decreased the abundance per sample and macroinvertebrate taxa below the dam in the Peñas Blancas River. Our study illustrates the effects of hydropower production on neotropical rivers, highlighting the importance of using multiple measures of macroinvertebrate assemblage structure for assessing this type of environmental impact.

  2. Hydroelectricity, an opportunity to grab?

    International Nuclear Information System (INIS)

    Yergeau, M.

    1997-01-01

    The deregulation within the electricity sector and the government''s project approval process were discussed. Deregulation was meant to simplify trade while providing consumers with a fair price, quality service and end-product quality. Proposals for large hydroelectric projects, however, must still be authorized by the government. The environmental assessment process for projects involving energy transmission infrastructures is long and complicated. All of Hydro-Quebec''s recent large projects were challenged in court. While energy market players need environmentally credible generating schemes, there appears to be nothing on the horizon to suggest that the approval process is going to be made easier soon. Indeed, there is every reason to believe that recent gains in environmental and social protection will not be sold off to ease the burden on utility companies to prove their case before construction. The choice is between speed and quality in matters of authorization, and while every effort should be made to combine the two, when it comes down to a choice, there should be no question as to what must be preserved. 2 figs

  3. What tools do we have to study the morphological effects of hydroelectric plants in developing countries? The Chilean case

    Science.gov (United States)

    Alcayaga, Hernan; Caamaño, Diego; Palma, Sebastian; Contreras, Karla

    2017-04-01

    Countries growing rates are directly related to energy production. Therefore, developed and developing nations are focused on hydropower and dam construction; on the contrary dam removal practices are significantly different among nations, demonstrating the former group a lesser interest on removing structures. Chiles hydropower generation corresponds to 50% of the current grid, having a potential capacity to double the current situation. Thus: ¿What tools can we apply to assess the potential impacts on our rivers? The goal of this project is to study two different reaches located in two separates streams in Central Chile. The Aconcagua River represents a mountain stream (i.e. steep, narrow, and confined) subject to the operation of a hydroelectric system composed by five diversion hydropower plants built during the 90`s. The Rapel River reach corresponds to the last 10km upstream to the outlet; it is a mild and wide stream that includes the gravel-sand transition. The Rapel dam operates about 25km upstream this second reach that is characterized by an 112m wall built in 1968. The Aconcagua hydropower system was characterized within a GIS environment and a morphological response conceptual model applied. The model uses two indexes to evaluate changes in i) channel forming discharge and ii) sediment supply. The provided response shows the trends and magnitudes of the changes, based in eighth possible directions for ten morphological responsible variables. The Rapel river system was evaluated differently and sampling of sediments characteristics (D50 and armour index), discharge index for both before and after the dam operation, Morphological Quality Index (IQM) and an analysis of aerial photography time series were performed. Results showed that the hydrology indicator impacts for the Aconcagua system were more severe than the impacts on sediments transport (typically the case for diversion type hydropower). A fine armour layer was found within the Rapel river site

  4. Evaluation of environmental impacts caused by hydroelectric power plants in native forest areas and mitigation measures

    International Nuclear Information System (INIS)

    Ramalho, Cyro Pinheiro

    1992-01-01

    The following work has the intention of demonstrating the importance of native forest to the human life, not only through its inherent qualities as something to preserve, but also as a source of great resources, and in particular hydroelectric resource that, by today's necessities are bounded to be explored. The negative effects caused by the implementation of a hydroelectric plant are shown together with the necessity of adoption of measures that would soften the environment impact of it. For the adoption of those measures, many forest studies were proposed in the search for its complete characterization. Each of these studies are duly defined and presented in their general and specific goals. The most adequate methodology is finally recommended. (author). 14 refs

  5. Genetic variability of wild populations of Leporinus elongatus in the São Domingos River - MS Brazil: a preliminary view on the construction of the hydroelectric plant

    Directory of Open Access Journals (Sweden)

    Ricardo Pereira Ribeiro

    2016-09-01

    Full Text Available Most of the electricity used in Brazil comes from hydroelectric plants, mainly due to the great availability of its water resources. However, the construction of these plants denotes serious problems related to migration of native fish and the genetic conservation of stocks. Current study evaluates two wild population of Leporinus elongatus (piapara located downstream (Population A - PopA and upstream (Population B - PopB of the Cachoeira Branca before the construction of the São Domingos hydroelectric plant (HPP in the Mato Grosso do Sul State, Brazil. Thirty samples from caudal fins were collected and analyzed for each population. Eighty-nine fragments, including 72 polymorphic ones (80.9%, were analyzed. Low fragments (less than 0.100 in both populations (PopA = 2 and PopB = 3 were identified. Nine fixed fragments (frequency 1.000 (PopA = 3 and PopB = 6, and four exclusive fragments (PopA = 3 and PopB = 1 were also reported. The genetic variability within populations, calculated by Shannon Index and by percentage of polymorphic fragments, indicated high rates of intrapopulation variability (PopA = 0.309 and 61.80% and PopB = 0.392 and 71.90%, respectively. Genetic distance and identity rates (0.089 and 0.915, respectively were different between populations, whilst AMOVA showed that most variations lie within the populations and not between them. Fst and Nm rates showed moderate genetic differentiation with low numbers of migrants. Results reveal populations with high intra-population genetic variability and genetic differentiation, with low gene flow. The passage ladders of São Domingos HPP should control fish transposition to preserve genetic variability.

  6. THE IMPACT OF THE ANTHROPIC FACTORS ON DISRUPTING AND DESTABILIZING THE ECOLOGICAL BALANCE OF THE VÂLSAN RIVER

    Directory of Open Access Journals (Sweden)

    Alina-Mihaela Vlăduţu

    2013-12-01

    Full Text Available The Vâlsan river is the only ecosystem in Romania and in the world where Romanichthys valsanicola, a Tertiary era relict, lives; this fish has a strictly limited habitat range and is on the Red List of U.I.C.N – under resolution D-46 of the E.C., as a “critically endangered species”. At present, the river Vâlsan is subjected to a cumulative effect of the disrupting factors upstream, as a result of the hydroelectrical structures and of human activity. It also suffers a number of negative effects relating to the quantity and the quality of its water, which require taking urgent steps in order to be diminished. The present paper presents the comparative situation of the invertebrate and piscicultural fauna prior to, and after, the beginning of the functioning of the Vâlsan hydrotechnical structure.

  7. Fish vs. power: Remaking salmon, science and society on the Fraser River, 1900--1960

    Science.gov (United States)

    Evenden, Matthew Dominic

    Overlapping resource demands made the Fraser River a contested site of development politics in twentieth century British Columbia. Since the turn of the century, power interests surveyed the river's flow, sited dams and promoted development schemes. Fisheries interests, on the other hand, sought to maintain the river as salmon spawning habitat. They questioned the necessity of dams, supported fisheries research and rehabilitation and organized anti-development coalitions. Before the mid-1950s a number of dam projects proceeded on Fraser tributaries and major landslides at Hells Gate modeled the dangers of main stem development. Because of the concerted political lobbying of fisheries groups, the skeptical appraisal of fisheries scientists to development proposals and the legal and political authority of the federal Department of Fisheries and the International Pacific Salmon Fisheries Commission, major dam projects were defeated on the Fraser in the late 1950s. Delayed development on the Fraser helped to spur hydroelectric projects on other rivers in the province; the fish-power problem on the Fraser altered the province's spatial economy of power. Once development began on the Columbia and Peace Rivers, the Fraser was protected by implication. The study combines approaches from environmental history, the history of science and political economy to demonstrate the intersections and interactions between nature, knowledge and society. Research was conducted at eleven archives in Canada and the United States in the papers of organizations, corporations, government departments, politicians, scientists and individuals.

  8. Imperatriz [MA] and Porto Nacional [TO]: two cities, a river and many stories

    Directory of Open Access Journals (Sweden)

    Leandro Mendes Rocha

    2015-06-01

    Full Text Available This study aims to show, in the environmental history perspective, aspects related to the nature of the Tocantins River,the socioeconomic relations, cultural values and the riverside population’s lifestyle in the 20th and 21st centuries. This analysis is made through the study of two cities: Imperatriz (MA and Porto Nacional (TO. Its aim is to notice the spatial, environmental and socioeconomic transformations experienced by these cities. Furthermore, we intend to analyze, in a comparative way, the impacts related to the construction of the Belém-Brasília highway, the North-South and Carajás railways, the hydroelectric dams and the Araguaia-Tocantins waterway.

  9. Hydrogen-based industry from remote excess hydroelectricity

    International Nuclear Information System (INIS)

    Ouellette, N.; Rogner, H.-H.; Scott, D.S.

    1997-01-01

    This paper examines synergies, opportunities and barriers associated with hydrogen and excess hydro-electricity in remote areas. The work is based on a case study that examined the techno-economic feasibility of a new hydrogen-based industry using surplus/off-peak generating capacity of the Taltson Dam and Generating Station in the Northwest Territories, Canada. After evaluating the amount and cost of hydrogen that could be produced from the excess capacity, the study investigates three hydrogen utilization scenarios: (1) merchant liquid or compressed hydrogen, (2) hydrogen as a chemical feedstock for the production of hydrogen peroxide, (3) methanol production from biomass, oxygen and hydrogen. Hydrogen peroxide production is the most promising and attractive strategy in the Fort Smith context. The study also illustrates patterns that recur in isolated sites throughout the world. (Author)

  10. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  11. Hydroelectric rent and precipitation variability: the case of Norway

    International Nuclear Information System (INIS)

    Amundsen, E.S.; Tjoetta, Sigve

    1993-01-01

    Norway is about to reorganize its electricity production sector from a predominantly administered one to one which is based on market prices and principles of efficiency. The objective of this paper is to model the energy sector and to measure the size of hydro rent before and after the reorganization. We construct a regionally diversified and integrated equilibrium model of production, transmission and distribution of hydroelectricity. Particular attention is paid to the role of precipitation variability for the size and regional variation of hydro rent. We consider alternative routes for assessing the size of hydro rent in a long-run perspective. (author)

  12. Local Economic Development and Hydropower Along the Brahmaputra River Basin in Northeast India

    Science.gov (United States)

    Mock, A.

    2014-12-01

    Large dams have long been controversial. They offer benefits, such as reduced greenhouse gas emissions, energy security, and local development, yet produce negative social and ecological impact, such as wildlife habitat destruction, human displacement, and the disruption of downstream fishing or agricultural industries. In the past decade, the Indian government has signed Memoranda of Understanding with hydroelectric power companies for the building of over 130 large dams on the Brahmaputra River in the state of Arunachal Pradesh in Northeast India. These dams can generate 43% of India's assessed hydropower potential to sustain India's growing economy. In addition, the Indian government claims that these dams will bring local development with needed jobs. However, local Arunachali people have protested and temporarily halted hydropower projects because of the impact of dams on their existing livelihoods. Using the North Eastern Electric Power Corporation's (NEEPCO) Ranganadi Hydroelectric Project as a case study, our project examined whether dams in Northeast India provide jobs for local people, and whether distance from the dam or work colony to a worker's hometown affects the type of job the worker received. Survey data from residents at NEEPCO's work colony in Doimukh, Arunachal Pradesh, was analyzed using SPSS (n = 18). Our research found that 100% of workers at the dam originally resided in Northeast India, with 33% from Arunachal Pradesh, and 67% from the nearby states of Assam, and Tripura. Further, our analysis revealed no statistically significant relationship between the distance to a worker's hometown and job type (p = .609). Where workers come from did not affect the type of job they received. More research using a larger sample size and additional hydroelectric project case studies is needed to further explore the relationship between worker home location and their job types.

  13. Seasonal variation in plasma nonesterified fatty acids of Lake Sturgeon (Acipenser fulvescens) in the vicinity of hydroelectric facilities

    International Nuclear Information System (INIS)

    McKinley, R.S.; Power, G.; Singer, T.D.; Ballantyne, J.S.

    1993-01-01

    To establish the effects of hydroelectric generation on the health of lake sturgeon (Acipenser fulvescens), seasonal variations in plasma nonesterified fatty acids (NEFAs) upstream and downstream from hydroelectric stations were measured over a 2-y period. Plasma NEFA profiles were also compared up- and downstream of the stations for differences in utilization of individual NEFA species as substrates for lipid oxidation. Significantly higher levels of total plasma NEFA were found in lake sturgeon upstream (2355 ± 395.9 nmole/ml) compared with those downstream (798 ± 133.5 nmole/ml) of the generating stations during the spring. The NEFA profiles for several key fatty acid species differed significantly among seasons up- and downstream of the facilities. In particular, during spring and summer, the levels of oleic acid (18:1n9) were highest upstream of the stations and levels of a polyunsaturated fatty acid, docosahexaenoic acid (22:6n3), were higher below rather than above the stations. The differences in plasma NEFA concentration may be attributed to altered nutritional status due to the varying flow regime located downstream of the hydroelectric stations. 33 refs., 4 figs., 1 tab

  14. The renewal of hydroelectric concessions in competitive call

    International Nuclear Information System (INIS)

    2013-01-01

    This document discusses various issues associated with the planned competitive call on the French hydraulic power plants. The principles of this competitive call for hydroelectric concessions are first addressed: administrative regime of concessions, competitive call process, criteria of selection of the concession holder, case of 'concession of valleys', potential competitors. It outlines and discusses the difficulties of this competitive call: France is the single country to implement this procedure; it concerns a national asset; it questions the guarantee of a future use of equipment at best for the energy benefits of French consumers; the competitive call is a nice idea indeed but extremely complex. A note discusses the profitability aspects of Plants for Transfer of Energy by Pumping

  15. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Science.gov (United States)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make

  16. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Directory of Open Access Journals (Sweden)

    Che Munaaim M.A.

    2018-01-01

    Full Text Available A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP. This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW and fall beyond of the range of a micro hydro power (5kW - 100kW since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing

  17. Influence of environmental parameters on the concentration of subsurface dissolved methane in two hydroelectric power plants in Brazil

    Science.gov (United States)

    Silva, M. G.; Marani, L.; Alvala, P. C.

    2013-12-01

    Methane (CH4) is a trace gas in the atmosphere of great importance for atmospheric chemistry as one of the main greenhouse gases. There are different sources with the largest individual production associated with the degradation of organic matter submerged in flooded areas. The amount of dissolved methane that reaches the surface depends on the production in the sediments and consumption in the water column. Both processes are associated with microbial activity and consequently dependent on the physico-chemical environmental conditions. The construction of hydroelectric dams cause flooding of areas near the river that can change the characteristics of the environment and cause changes in subsurface methane concentration. In this work, we studied two hydroelectric plants located in Brazil: Batalha (17°20'39.52"S, 47°29'34.29"W), under construction when the samples were take, and Itaipu (25°24'45.00"S, 54°35'39.00"W) which has been floated over 30 years ago. The water samples to determine dissolved methane were collected approximately 5 cm near the surface. In each collection point was measured depth, water temperature, pH and redox potential. The range of dissolved methane between the two dams was similar: 0.07-10.33 μg/l (Batalha) and 0.15-10.93 μg/l (Itaipu). However, the Batalha's average (4.04 × 3.43 μg/l; median = 3.66 μg/l) was higher than that observed in Itaipu (2.15 × 1.59 μg/l; median = 2.53 μg/l). The influence of environmental parameters on the concentration of dissolved methane was evaluated by multivariate statistical techniques (Principal Component Analysis - PCA). All of the parameters had some correlation with dissolved methane, however, the greatest contribution in Batalha was associated with pH while in Itaipu was the depth. The pH variation of the various points studied in Batalha may be associated with periods of drought and flooding of the river and hence the incorporation of organic matter in the environment. The organisms

  18. Determining Columbia and Snake River Project Tailrace and Forebay Zones of Hydraulic Influence using MASS2 Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01

    Although fisheries biology studies are frequently performed at US Army Corps of Engineers (USACE) projects along the Columbia and Snake Rivers, there is currently no consistent definition of the ``forebay'' and ``tailrace'' regions for these studies. At this time, each study may use somewhat arbitrary lines (e.g., the Boat Restriction Zone) to define the upstream and downstream limits of the study, which may be significantly different at each project. Fisheries researchers are interested in establishing a consistent definition of project forebay and tailrace regions for the hydroelectric projects on the lower Columbia and Snake rivers. The Hydraulic Extent of a project was defined by USACE (Brad Eppard, USACE-CENWP) as follows: The river reach directly upstream (forebay) and downstream (tailrace) of a project that is influenced by the normal range of dam operations. Outside this reach, for a particular river discharge, changes in dam operations cannot be detected by hydraulic measurement. The purpose of this study was to, in consultation with USACE and regional representatives, develop and apply a consistent set of criteria for determining the hydraulic extent of each of the projects in the lower Columbia and Snake rivers. A 2D depth-averaged river model, MASS2, was applied to the Snake and Columbia Rivers. New computational meshes were developed most reaches and the underlying bathymetric data updated to the most current survey data. The computational meshes resolved each spillway bay and turbine unit at each project and extended from project to project. MASS2 was run for a range of total river flows and each flow for a range of project operations at each project. The modeled flow was analyzed to determine the range of velocity magnitude differences and the range of flow direction differences at each location in the computational mesh for each total river flow. Maps of the differences in flow direction and velocity magnitude were created. USACE

  19. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  20. Rapid green synthesis of ZnO nanoparticles using a hydroelectric cell without an electrolyte

    Science.gov (United States)

    Shah, Jyoti; Kumar Kotnala, Ravinder

    2017-09-01

    In this study, zinc oxide (ZnO) nanoparticles were synthesized using a novel environmentally friendly hydroelectric cell without an electrolyte or external current source. The hydroelectric cell comprised a nanoporous Li substituted magnesium ferrite pellet in contact with two electrodes, with zinc as the anode and silver as an inert cathode. The surface unsaturated cations and oxygen vacancies in the nanoporous ferrite dissociated water molecules into hydronium and hydroxide ions when the hydroelectric cell was dipped into deionized water. Hydroxide ions migrated toward the zinc electrode to form zinc hydroxide and the hydronium ions were evolved as H2 gas at the silver electrode. The zinc hydroxide collected as anode mud was converted into ZnO nanoparticles by heating at 250 °C. Structural analysis using Raman spectroscopy indicated the good crystallinity of the ZnO nanoparticles according to the presence of a high intensity E2-(high) mode. The nanoparticle size distribution was 5-20 nm according to high resolution transmission electron microscopy. An indirect band gap of 2.75 eV was determined based on the Tauc plot, which indicated the existence of an interstitial cation level in ZnO. Near band edge and blue emissions were detected in photoluminescence spectral studies. The blue emissions obtained from the ZnO nanoparticles could potentially have applications in blue lasers and LEDs. The ZnO nanoparticles synthesized using this method had a high dielectric constant value of 5 at a frequency of 1 MHz, which could be useful for fabricating nano-oscillators. This facile, clean, and cost-effective method obtained a significant yield of 0.017 g for ZnO nanoparticles without applying an external current source.