WorldWideScience

Sample records for test project mariah

  1. Mariah Carey《Memories ofan Imperfect Angel》专辑不完美的爱

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    在这张全新大碟中,Mariah Carey想要传达的主题是表现人们生命中各个阶段不同的爱,歌曲的灵感有些来自Marlah的经历,有些则是周围朋友们的真实写照。专辑中的每首格都紧密地围绕着爱的主题,为我们呈现了一张完整的,足以成为经典的专辑。第一主打单曲《Obessed》的MV还请来了执导《尖峰时刻》三部曲的Brett Ratnor导演.而Mariah Carey则在其中分饰2角,

  2. Prosody Analysis of Mariah Carey’s 1999 Billboard Award Speech and Its Contribution to EFL

    Directory of Open Access Journals (Sweden)

    Heri Setiawan

    2017-07-01

    Full Text Available Prosodic elements are the essential elements in human beings’ speech that can be used to know what the speakers of an utterance exactly mean when they are speaking. This research was a work of analysis on prosody of speech to know the emotion and the meaning of utterances. Descriptive qualitative type of research model was employed in this research. The object of the research was Mariah Carey’s speech when she was receiving a special award named the Billboard artist of the decade in 1999. The researcher was interested in not only knowing about Mariah Carey’s emotion and meaning when she was delivering her speech but also finding other uses of prosodic elements which were not found in the supporting previous literatures used in this research. Moreover, the possible contribution which these research findings could contribute to the EFL teaching and learning was also addressed. It is evident that prosody definitely has significant contribution in EFL teaching and learning especially in improving speaking and reading comprehension skills

  3. MEGAPIE-TEST: A European Project on Spallation Target Testing

    International Nuclear Information System (INIS)

    Knebel, Joachim U.; Klein, Jean-Christophe; Gorse, Dominique; Agostini, Pietro; Groeschel, Friedrich; Kupschus, Peter; Kirchner, Thomas; Vogt, Jean-Bernard

    2002-01-01

    Within the Euratom 5. Framework Programme (5FP) the European Commission is funding the MEGAPIE-TEST Project (Megawatt Pilot Experiment - Testing) over a period of three years, starting in September 2001. The project is combining the efforts of 8 main associations. MEGAPIE is a liquid metal spallation target of 1 MW of beam power. The main results of the MEGAPIE-TEST project will be: Development and comprehensive testing of a liquid metal spallation target both under beam-off and beam-on conditions, and the set up of a handbook on the design of a neutron spallation source in general. The operation of MEGAPIE within the accelerator complex SINQ at Paul Scherrer Institute (PSI), Switzerland, is envisaged in 2004. MEGAPIE is a first decisive step to realize a liquid metal spallation target in Europe. This report is giving an overview of the MEGAPIE-TEST Project, the overall work plan, and preliminary results from the design support and validation, which form an important basis for the project. (authors)

  4. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  5. Yeager Airport Hydrogen Vehicle Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Williams [West Virginia University Research Corporation, Morgantown, WV (United States)

    2015-10-01

    The scope of this project was changed during the course of the project. Phase I of the project was designed to have the National Alternative Fuels Training Consortium (NAFTC), together with its partners, manage the Hydrogen Vehicle Test Project at the Yeager Airport in conjunction with the Central West Virginia Regional Airport Authority (CWVRAA) in coordination with the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL). This program would allow testing and evaluation of the use of hydrogen vehicles in the state of West Virginia utilizing the hydrogen fueling station at Yeager Airport. The NAFTC and CWVRAA to raise awareness and foster a greater understanding of hydrogen fuel and hydrogen-powered vehicles through a targeted utilization and outreach and education effort. After initial implementation of the project, the project added, determine the source(s) of supply for hydrogen powered vehicles that could be used for the testing. After completion of this, testing was begun at Yeager Airport. During the course of the project, the station at Yeager Airport was closed and moved to Morgantown and the West Virginia University Research Corporation. The vehicles were then moved to Morgantown and a vehicle owned by the CWVRAA was purchased to complete the project at the new location. Because of a number of issues detailed in the report for DE-FE0002994 and in this report, this project did not get to evaluate the effectiveness of the vehicles as planned.

  6. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  7. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  8. Test Specification of A1-1 Test for OECD-ATLAS Project

    International Nuclear Information System (INIS)

    Kang, Kyoung-Ho; Moon, Sang-Ki; Lee, Seung-Wook; Choi, Ki-Yong; Song, Chul-Hwa

    2014-01-01

    In the OECD-ATLAS project, design extension conditions (DECs) such as a station blackout (SBO) and a total loss of feed water (TLOFW) will be experimentally investigated to meet the international interests in the multiple high-risk DECs raised after the Fukushima accident. The proposed test matrix for the OECD-ATLAS project is summarized in Table 1.. In this study, detailed specification of the first test named as A1-1 in the OECD-ATLAS project was described. The target scenario of the A1-1 test is a prolonged SBO with delayed supply of turbine-driven auxiliary feedwater to only SG number 2 (SG-2). A SBO is one of the most important DECs in that without any proper operator actions, a total loss of heat sink leads to core uncover, to core damage, and ultimately a core melt-down scenario under high pressure. Due to this safety importance, a SBO is considered to be a base test item of the OECD-ATLAS project. A detailed specification of the first test named as A1-1 in the OECD-ATLAS project was described. The target scenario of the A1-1 test is a prolonged SBO with delayed supply of turbine-driven auxiliary feedwater to only SG-2 in order to consider an accident mitigation measure. The pre-test analysis using MARS code was performed with an aim of setting up the detailed test procedures for A1-1 test and also gaining the physical insights for a prolonged SBO transient. In the A1-1 test, a prolonged SBO transient will be simulated with two temporal phases: Phase (I) for conservative SBO transient without supply of turbine-driven auxiliary feedwater and Phase (II) for asymmetric cooling via single trained supply of turbine-driven auxiliary feedwater

  9. Palju alusetuid lubadusi / Erik Morna

    Index Scriptorium Estoniae

    Morna, Erik, 1969-

    1999-01-01

    Heliplaatidest : Stina Nordenstam : People are strange ; Mariah Carey : 1'S ; Muusika filmist ja filmist inspireeritud muusika : Psycho ; Erinevad gershwinistid : Red Hot + Rhapsody ; Jennifer Rush : Classics

  10. Strip reduction testing of lubricants developed during ENFORM project

    DEFF Research Database (Denmark)

    Gazvoda, S.; Andreasen, Jan Lasson; Olsson, David Dam

    Strip reduction testing of lubricants developed during ENFORM project. Experiments were conducted with the strip reduction test [1] in order to classify experimental lubricants, developed during concerned project. One reference lubricant was used during testing....

  11. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  12. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  13. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  14. Psychometry and Pescatori projective test in coloproctological patients.

    Science.gov (United States)

    Caetano, Ana Célia; Oliveira, Dinis; Gomes, Zaida; Mesquita, Edgar; Rolanda, Carla

    2017-01-01

    Psychological assessment is not commonly performed nor easily accepted by coloproctological patients. Our aim was to evaluate the psychological component of coloproctological disorders using uncommon tools. The 21-Item Depression Anxiety and Stress Scale and the Pescatori projective test were applied to coloproctological outpatients of the Gastroenterology Department of our hospital as well as to healthy volunteers. Seventy patients (median age 47 years, 22 male) divided in 4 groups (functional constipation, constipated irritable bowel syndrome, benign anorectal disease and perianal Crohn's disease) and 52 healthy volunteers (age 45 years, 18 male) completed the tests. Proctological patients showed higher scores of depression (Pprojective test (P=0.012). A weak association between the projective test and the depression subscale was found (P=0.05). Proctological patients had higher scores of depression, anxiety and stress and lower scores in the Pescatori projective test compared to healthy controls.

  15. [Using projective tests in forensic psychiatry may lead to wrong conclusions. Only empirically tested tests should be used].

    Science.gov (United States)

    Trygg, L; Dåderman, A M; Wiklund, N; Meurling, A W; Lindgren, M; Lidberg, L; Levander, S

    2001-06-27

    The use of projective and psychometric psychological tests at the Department of Forensic Psychiatry in Stockholm (Huddinge), Sweden, was studied for a population of 60 men, including many patients with neuropsychological disabilities and multiple psychiatric disorders. The results showed that the use of projective tests like Rorschach, Object Relations Test, and House-Tree-Person was more frequent than the use of objective psychometric tests. Neuropsychological test batteries like the Halstead-Reitan Neuropsychological Test Battery or Luria-Nebraska Neuropsychological Battery were not used. The majority of patients were, however, assessed by intelligence scales like the WAIS-R. The questionable reliability and validity of the projective tests, and the risk of subjective interpretations, raise a problem when used in a forensic setting, since the courts' decisions about a sentence to prison or psychiatric care is based on the forensic psychiatric assessment. The use of objective psychometric neuropsychological tests and personality tests is recommended.

  16. Project W320 52-inch diameter equipment container load test: Test report

    International Nuclear Information System (INIS)

    Bellomy, J.R.

    1995-01-01

    This test report summarizes testing activities and documents the results of the load tests performed on-site and off-site to structural qualify the 52-inch equipment containers designed and fabricated under Project W-320

  17. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.; Bukhari, Duaa

    2013-01-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  18. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.

    2013-06-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  19. The SSM/PMAD automated test bed project

    Science.gov (United States)

    Lollar, Louis F.

    1991-01-01

    The Space Station Module/Power Management and Distribution (SSM/PMAD) autonomous subsystem project was initiated in 1984. The project's goal has been to design and develop an autonomous, user-supportive PMAD test bed simulating the SSF Hab/Lab module(s). An eighteen kilowatt SSM/PMAD test bed model with a high degree of automated operation has been developed. This advanced automation test bed contains three expert/knowledge based systems that interact with one another and with other more conventional software residing in up to eight distributed 386-based microcomputers to perform the necessary tasks of real-time and near real-time load scheduling, dynamic load prioritizing, and fault detection, isolation, and recovery (FDIR).

  20. Yucca Mountain project prototype testing

    International Nuclear Information System (INIS)

    Hughes, W.T.; Girdley, W.A.

    1990-01-01

    The U.S. DOE is responsible for characterizing the Yucca Mountain site in Nevada to determine its suitability for development as a geologic repository to isolate high-level nuclear waste for at least 10,000 years. This unprecedented task relies in part on measurements made with relatively new methods or applications, such as dry coring and overcoring for studies to be conducted from the land surface and in an underground facility. The Yucca Mountain Project has, since 1988, implemented a program of equipment development and methods development for a broad spectrum of hydrologic, geologic, rock mechanics, and thermomechanical tests planned for use in an Exploratory Shaft during site characterization at the Yucca Mountain site. A second major program was fielded beginning in April 1989 to develop and test methods and equipment for surface drilling to obtain core samples from depth using only air as a circulating medium. The third major area of prototype testing has been during the ongoing development of the Instrumentation/ Data Acquisition System (IDAS), designed to collect and monitor data from down-hole instrumentation in the unsaturated zone, and store and transmit the data to a central archiving computer. Future prototype work is planned for several programs including the application of vertical seismic profiling methods and flume design to characterizing the geology at Yucca Mountain. The major objectives of this prototype testing are to assure that planned Site Characterization testing can be carried out effectively at Yucca Mountain, both in the Exploratory Shaft Facility (ESF), and from the surface, and to avoid potential major failures or delays that could result from the need to re-design testing concepts or equipment. This paper will describe the scope of the Yucca Mountain Project prototype testing programs and summarize results to date. 3 figs

  1. The Yucca Mountain Project Prototype Testing Program

    International Nuclear Information System (INIS)

    1989-10-01

    The Yucca Mountain Project is conducting a Prototype Testing Program to ensure that the Exploratory Shaft Facility (ESF) tests can be completed in the time available and to develop instruments, equipment, and procedures so the ESF tests can collect reliable and representative site characterization data. This report summarizes the prototype tests and their status and location and emphasizes prototype ESF and surface tests, which are required in the early stages of the ESF site characterization tests. 14 figs

  2. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  3. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  4. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  5. RDHWT/MARIAH II Hypersonic Wind Tunnel Research Program

    Science.gov (United States)

    2008-09-01

    Summary of Baseline Design Concepts SSTO : Single Stage to Orbit TSTO: Two Stage to Orbit RBCC: Rocket-Based Combined Cycle ODWE: Oblique Detonation...for most other hypersonic air-breathing propulsion applications. Required test times for the Mach 8 Cruise and SSTO type vehicles are shown in Table 3...Air-BreathingMach Range Length, m (ft) Propulsion Mach 8 Cruise Missile 4 to 8 4.3 (14) Hydrocarbon Scramjet SSTO Space Access with RBCC 0 to 14 62.8

  6. Kuula. Kuu artist Scarlett Johansson. Kuu plaat / Mart Juur

    Index Scriptorium Estoniae

    Juur, Mart, 1964-

    2008-01-01

    Näitlejast ja lauljast Scarlett Johanssonist. Heliplaatidest: Madonna "Hard Candy", Vaiko Eplik ja Eliit "3: Kosmoseodüsseia", Pia Fraus "After Summer", HU? "Film", Enrique Iglesias "95/08 Exitos", Pendulum "In Silico", Mariah Carey "E=MC2"

  7. Project W-049H disposal facility test report

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1995-01-01

    The purpose of this Acceptance Test Report (ATR) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the equipment installed in the Disposal Facility has been installed in accordance with the design documents and function as required by the project criteria

  8. Pop / Siim Nestor

    Index Scriptorium Estoniae

    Nestor, Siim, 1974-

    2008-01-01

    Heliplaatidest: Supergrass "Diamond Hoo Ha", Man In Maardu "Solid Symphonies", Van Der Graaf Generator "Trisector", Bon Iver "For Emma, Forever Ago", The Last Shadow Puppets "The Age Of The Understatement", Brad Mehldau Trio "Live", Mariah Carey "E=MCø"

  9. Urban High School Student Engagement through CincySTEM iTEST Projects

    Science.gov (United States)

    Beckett, Gulbahar H.; Hemmings, Annette; Maltbie, Catherine; Wright, Kathy; Sherman, Melissa; Sersion, Brian

    2016-01-01

    This paper focuses on the notable heightening of underrepresented students' engagement in STEM education through project-based learning CincySTEM iTEST projects. The projects, funded by an iTEST NSF grant, were designed and facilitated by teachers at a new STEM urban public high school serving low-income African-American students. Student…

  10. Patterns of referral to Red Cross War Memorial Children's Hospital ...

    African Journals Online (AJOL)

    Memorial Children's Hospital, K1ipfontein Road, Rondebosch, 7700 RSA,. Accepted 10 Apt 1990, ... of every patient referred in the study period, or recorded the folder number of ..... Council for providing a short-term grant; Mariah Jacobs of the.

  11. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  12. Gas reactor in-pile safety test project (GRIST-2)

    International Nuclear Information System (INIS)

    Kelley, A.P. Jr.; Arbtin, E.; St Pierre, R.

    1979-01-01

    Although out-of-pile tests may be expected to confirm individual phenomena models in core disruptive accident analysis codes, only in-pile tests are capable of verifying the extremely complex integrated model effects within the appropriate time phase for these accidents. For this reason, the GRIST-2 project, the purpose of which is to design and construct an in-pile helium loop capable of transient safety testing in the TREAT facility in Idaho, forms a cornerstone of the US GCFR safety program. The project organization, experiment program, facility, helium system design, and schedule which have been selected to meet the objectives are described

  13. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  14. Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

    International Nuclear Information System (INIS)

    Berglin, B.G.

    1998-01-01

    This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ''Mixer Pump Test Specification for Project W-151'' and Statement of Work 8K520-EMN-95-004 ''Mixer Pump Performance Demonstration at MASF'' in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work

  15. Study on operation I and C DCS test method of EPR project

    International Nuclear Information System (INIS)

    Meng Ying; Lv Zhihong; Huang Xinnian; Fan Haiying; Li Zhuojia; Xiao Shushu

    2014-01-01

    Through summarization and optimization of the method for operation I and C DCS test of the European pressurized reactor project, the conclusions play a guiding role on the operation I and C DCS test of the domestic advanced nuclear power plant. The study of the method focuses on the test platform, the test process and the optimization of method of operation I and C DCS test with the practical experience. The reasonable and reliable test method for operation I and C DCS test of the European pressurized reactor project is worthy of the reference and the development in the project of the domestic advanced nuclear power plant. (authors)

  16. Queer signs: The women of the British projective test movement.

    Science.gov (United States)

    Hubbard, Katherine

    2017-07-01

    As queer history is often hidden, historians must look for "signs" that hint at queer lives and experiences. When psychologists use projective tests, the search for queer signs has historically been more literal, and this was especially true in the homophobic practices of Psychology in the mid-twentieth century. In this paper, I respond to Elizabeth Scarborough's call for more analytic history about the lesser known women in Psychology's history. By focusing on British projective research conducted by lesbian psychologist June Hopkins, I shift perspective and consider, not those who were tested (which has been historically more common), but those who did the testing, and position them as potential queer subjects. After briefly outlining why the projective test movement is ripe for such analysis and the kinds of queer signs that were identified using the Rorschach ink blot test in the mid-twentieth century, I then present June Hopkins' (1969, 1970) research on the "lesbian personality." This work forms a framework upon which I then consider the lives of Margaret Lowenfeld, Ann Kaldegg, and Effie Lillian Hutton, all of whom were involved in the British projective test movement a generation prior to Hopkins. By adopting Hopkins' research to frame their lives, I present the possibility of this ambiguous history being distinctly queer. © 2017 Wiley Periodicals, Inc.

  17. Plaadid / Valner Valme

    Index Scriptorium Estoniae

    Valme, Valner, 1970-

    2005-01-01

    Uutest heliplaatidest Kaiser Chiefs "Employment", Low "The Great destroyer", Broken Time Orchestra "Broken Time", Mariah Carey "Emancipation Of Mimi", 22 Pistepirkko "Drops & Kicks", Jimmy Eat World "Futures", Nitty "Player's Paradise", Gilad Atzmon & The Orient House Ensemble "Re-arranging the 20th Century"

  18. Marviken test-data interpretation, second project

    International Nuclear Information System (INIS)

    Collen, J.; Johansson, A.

    1978-12-01

    A brief description is given of the investigations carried out and the corclusions drawn within the MARTIN-II project, which involved the evaluation and interpretation of the data from the full scale containment response tests at the Marviken Power Station. The data from the tests, which were completed in 1976, provide information about the periodic pressure oscillations and rapid pressure spikes induced in the pressure-suppression containment during study comprise the following items: - Influence of test parameters on pressure oscillations and pressure spikes - Pressure spikes in the wetwell pool - High frequency oscillations - Comparisons between single-pipe and multi-pipe data The study was carried out by Studsvik Energiteknik AB with consulting efforts from AB ASEA-ATOM. It was financed by the Swedish Nuclear Power Inspectorate. (Auth.)

  19. A process dissociation approach to objective-projective test score interrelationships.

    Science.gov (United States)

    Bornstein, Robert F

    2002-02-01

    Even when self-report and projective measures of a given trait or motive both predict theoretically related features of behavior, scores on the 2 tests correlate modestly with each other. This article describes a process dissociation framework for personality assessment, derived from research on implicit memory and learning, which can resolve these ostensibly conflicting results. Research on interpersonal dependency is used to illustrate 3 key steps in the process dissociation approach: (a) converging behavioral predictions, (b) modest test score intercorrelations, and (c) delineation of variables that differentially affect self-report and projective test scores. Implications of the process dissociation framework for personality assessment and test development are discussed.

  20. Project B610 process control configuration acceptance test report

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators' console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing

  1. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  2. Project accent: graphite irradiated creep in a materials test reactor

    International Nuclear Information System (INIS)

    Brooking, M.

    2014-01-01

    Atkins manages a pioneering programme of irradiation experiments for EDF Energy. One of these projects is Project ACCENT, designed to obtain evidence of a beneficial physical property of the graphite, which may extend the life of the Advanced Gas-cooled Reactors (AGRs). The project team combines the in-house experience of EDF Energy with two supplier organisations (providing the material test reactors and testing facilities) and supporting consultancies (Atkins and an independent technical expert). This paper describes: - Brief summary of the Project; - Discussion of the challenges faced by the Project; and - Conclusion elaborating on the aims of the Project. These challenging experiments use bespoke technology and both un-irradiated (virgin) and irradiated AGR graphite. The results will help to better understand graphite irradiation-induced creep (or stress modified dimensional change) properties and therefore more accurately determine lifetime and safe operating envelopes of the AGRs. The first round of irradiation has been completed, with a second round about to commence. This is a key step to realising the full lifetime ambition for AGRs, demonstrating the relaxation of stresses within the graphite bricks. (authors)

  3. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  4. Sex Differences in Objective and Projective Dependency Tests: A Meta-Analytic Review.

    Science.gov (United States)

    Bornstein, Robert F.

    1995-01-01

    A meta-analysis of 97 studies published since 1950 that assessed sex differences in scores on objective and projective dependency tests indicated that women consistently obtained higher dependency scores on objective tests, and men obtained higher scores on projective tests. Findings are discussed in terms of sex role socialization. (SLD)

  5. Testing and Commissioning of Lillgrund Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Poul Erik; Larsson, Aake; Jeppsson, Joakim; Toernkvist, Mattias (ed.) (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-04-15

    This report gives an overview of the tests carried out in the Lillgrund project. The report covers factory tests, site tests and the performance tests, which can be carried out during the defects liability period. The report describes tests relevant for the wind turbine generators, the electrical system and the foundations. On the whole, the Lillgrund test results have been satisfactory. One of the more problematic issues experienced were when the foundation interface verification showed that the bolts were not meeting the height requirements. Since this shortcoming was detected relatively early in the project life, it was possible to correct the misalignment and keep the additional costs to a minimum. From a management point of view, this highlighted the importance of clear and unambiguous interface specifications and to make sure that the project has a proper interface management function. According to the Contract, Vattenfall has the right to verify a number of performance parameters during the 5-year defect liability period. The performance tests include availability, power curve, electrical system losses and acoustic noise levels. The contract specifies the test criteria, the test methods and procedures and the penalty if the tests result in undesirable levels. In some cases, there is a financial incentive for the supplier if the tests show that the wind farm is performing better than stipulated in the contract. Lillgrund has performed very well thus far and Vattenfall has determined that the contractual performance requirements are being met. Vattenfall has, therefore, not requested to carry out any of these elective Performance Tests

  6. Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-11-01

    The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hot brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.

  7. Reedsport PB150 Deployment and Ocean Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Hart, Phil [Ocean Power Technologies Inc., Pennington, NJ (United States)

    2016-06-03

    As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport (OR) was planned to consist of 10 PowerBuoys (Phase II)1, located 2.5 miles off the coast. U.S. Department of Energy (DOE) funding under a prior DOE Grant (DE-FG36-08GO88017) along with funding from PNGC Power, an Oregon-based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. The design and fabrication of the first PowerBuoy and factory testing of the power take-off subsystem were completed, and the power take-off subsystem was successfully integrated into the spar at the fabricator’s facility in Oregon. The objectives of this follow-on grant were: advance PB150B design from TRL 5/6 to TRL 7/8; deploy a single PB150 and operate autonomously for 2 years; establish O&M costs; collect environmental information; and establish manufacturing methodologies.

  8. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  9. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  10. Project Physics Tests 4, Light and Electromagnetism.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 4 are presented in this booklet. Included are 70 multiple-choice and 22 problem-and-essay questions. Concepts of light and electromagnetism are examined on charges, reflection, electrostatic forces, electric potential, speed of light, electromagnetic waves and radiations, Oersted's and Faraday's work,…

  11. Cross-Cultural Validation of TEMAS, a Minority Projective Test.

    Science.gov (United States)

    Costantino, Giuseppe; And Others

    The theoretical framework and cross-cultural validation of Tell-Me-A-Story (TEMAS), a projective test developed to measure personality development in ethnic minority children, is presented. The TEMAS test consists of 23 chromatic pictures which incorporate the following characteristics: (1) representation of antithetical concepts which the…

  12. Experimental Results of A1.2 Test for OECD-ATLAS Project

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Kyoung-Ho; Bae, Byoung-Uhn; Park, Yu-Sun; Kim, Jong-Rok; Choi, Nam-Hyun; Choi, Ki-Yong [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    In order to meet the international interests in the multiple high-risk design extension conditions (DECs) raised after the Fukushima accident, KAERI (Korea Atomic Energy Research Institute) is operating an OECD/NEA project (hereafter, OECD-ATLAS project) by utilizing a thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation). As for a prolonged SBO transient of the OECD-ATLAS project, two tests, named A1.1 and A1.2, were determined to be performed. In particular, passive safety systems are considered as the most promising alternatives to reinforce the safety and reliability of an ultimate heat removal system without any operator actions in the SBO transients. As one of the new safety improvement concepts to mitigate an SBO accident efficiently, a cooling and operational performance of the passive auxiliary feedwater system (PAFS) is investigated in the framework of the OECD-ATLAS project to produce clearer knowledge of the actual phenomena and to provide the best guidelines for accident management. As the second test of the OECD-ATLAS project, the A1.2 test was conducted to simulate a prolonged SBO with asymmetric secondary cooling through the supply of passive auxiliary feedwater only to SG-2. When the collapsed water level of steam generator reached a wide range of 25%, PAFS was actuated. PAFS played a key role in cooling down the primary system by the heat transfer and the natural circulation. With the actuation of PAFS, the fluid temperatures at the core inlet and outlet started to decrease without any excursion of the maximum heater surface temperature in the core. This integral effect test data of A1.2 test can be used to evaluate the prediction capability of existing safety analysis codes and identify any code deficiency for an SBO simulation with an operation of a passive system such as PAFS.

  13. Project Physics Tests 1, Concepts of Motion.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 1 are presented in this booklet, consisting of 70 multiple-choice and 20 problem-and-essay questions. Concepts of motion are examined with respect to velocities, acceleration, forces, vectors, Newton's laws, and circular motion. Suggestions are made for time consumption in answering some items. Besides…

  14. Project W-314 Polyurea Special Protective Coating (SPC) Test Report Chemical Compatibility and Physical Characteristics Testing

    International Nuclear Information System (INIS)

    MAUSER, R.W.

    2001-01-01

    This Engineering Test report outlines the results obtained from testing polyurea on its decon factor, tank waste compatibility, and adhesion strength when subjected to a high level of gamma radiation. This report is used in conjunction with RPP-7187 Project W-314 Pit Coatings Repair Requirements Analysis, to document the fact polyurea meets the project W-314 requirements contained in HNF-SD-W314-PDS-005 and is therefore an acceptable SPC for use in W-314 pit refurbishments

  15. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    Ove Arup and Partners

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  16. Progress of the Hanford Bulk Vitrification Project ICVTM Testing Program

    International Nuclear Information System (INIS)

    Witwer, K.S.; Woolery, D.W.; Dysland, E.J.

    2006-01-01

    In June 2004, the Bulk Vitrification Project was initiated with the intent to engineer, construct and operate a full-scale bulk vitrification pilot-plant to treat low-activity tank waste from Hanford tank 241-S-109. The project, managed by CH2M HILL Hanford Group, Inc., and performed by AMEC Earth and Environmental, Inc. (AMEC), will develop and operate a full-scale demonstration facility to exhibit the effectiveness of the bulk vitrification process under actual operating conditions. Since project initiation, testing has been undertaken using crucible-scale, 1/6 linear (engineering) scale, and full-scale vitrification equipment. Crucible-scale testing, coupled with engineering-scale testing, helps establish process limitations of selected glass formulations. Full-scale testing provides critical design verification of the In Container Vitrification (ICV) TM process both prior to and during operation of the demonstration facility. Beginning in late 2004, several full-scale tests have been performed at AMEC's test site, located adjacent to the U.S. Department of Energy's Hanford Site, in Richland, WA. Early testing involved verification of melt startup methodology, followed by subsequent full-melt testing to validate critical design parameters and demonstrate the 'Bottom-Up, Feed While Melt' process. As testing has progressed, design improvements have been identified and incorporated into each successive test. Full scale testing at AMEC's test site is currently scheduled to complete in 2006, with continued full-scale operational testing at the demonstration facility on the Hanford Site starting in 2007. Additional engineering scale testing will validate recommended glass formulations that have been provided by the Pacific Northwest National Laboratory (PNNL). This testing is expected to continue through 2006. This paper discusses the progress of the full-scale and engineering scale testing performed to date. Crucible-scale testing, a critical step in developing

  17. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW's Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  18. Execution of pilot tests for an uranium in situ leaching project

    International Nuclear Information System (INIS)

    Koch, H.J.

    1983-01-01

    Urangesellschaft is presently evaluating the technical and economic feasibility of an in situ leaching (ISL) project in Wyoming/USA. This report describes the basic technical principles for ISL-uranium projects and gives the reasons for conducting pilot tests prior to the construction of a commercial plant. It further describes the licensing requirements for an ISL-pilot plant and evaluates the results of the pilot tests. (orig.) [de

  19. Optimised Environmental Test Approaches in the GOCE Project

    Science.gov (United States)

    Ancona, V.; Giordano, P.; Casagrande, C.

    2004-08-01

    The Gravity Field and Steady-State Ocean Circulation Explorer (GOCE) is dedicated to measuring the Earth's gravity field and modelling the geoid with extremely high accuracy and spatial resolution. It is the first Earth Explorer Core mission to be developed as part of ESA's Living Planet Programme and is scheduled for launch in 2006. The program is managed by a consortium of European companies: Alenia Spazio, the prime contractor, Astrium GmbH, the platform responsible, Alcatel Space Industries and Laben, suppliers of the main payloads, respectively the Electrostatic Gravity Gradiometer (EGG) and the Satellite to Satellite Tracking Instrument (SSTI), actually a precise GPS receiver. The GOCE Assembly Integration and Verification (AIV) approach is established and implemented in order to demonstrate to the customer that the satellite design meets the applicable requirements and to qualify and accept from lower level up to system level. The driving keywords of "low cost" and "short schedule" program, call for minimizing the development effort by utilizing off-the-shelf equipment combined with a model philosophy lowering the number of models to be used. The paper will deal on the peculiarities of the optimized environmental test approach in the GOCE project. In particular it introduces the logic of the AIV approach and describe the foreseen tests at system level within the SM environmental test campaign, outlining the Quasi Static test performed in the frame of the SM sine vibration tests, and the PFM environmental test campaign pinpointing the deletion of the Sine Vibration test on PFM model. Furthermore the paper highlights how the Model and Test Effectiveness Database (MATD) can be utilized for the prediction of the new space projects like GOCE Satellite.

  20. Accelerated Test Method for Corrosion Protective Coatings Project

    Science.gov (United States)

    Falker, John; Zeitlin, Nancy; Calle, Luz

    2015-01-01

    This project seeks to develop a new accelerated corrosion test method that predicts the long-term corrosion protection performance of spaceport structure coatings as accurately and reliably as current long-term atmospheric exposure tests. This new accelerated test method will shorten the time needed to evaluate the corrosion protection performance of coatings for NASA's critical ground support structures. Lifetime prediction for spaceport structure coatings has a 5-year qualification cycle using atmospheric exposure. Current accelerated corrosion tests often provide false positives and negatives for coating performance, do not correlate to atmospheric corrosion exposure results, and do not correlate with atmospheric exposure timescales for lifetime prediction.

  1. Medication monitoring and drug testing ethics project.

    Science.gov (United States)

    Payne, Richard; Moe, Jeffrey L; Sevier, Catherine Harvey; Sevier, David; Waitzkin, Michael

    2015-01-01

    In 2012, Duke University initiated a research project, funded by an unrestricted research grant from Millennium Laboratories, a drug testing company. The project focused on assessing the frequency and nature of questionable, unethical, and illegal business practices in the clinical drug testing industry and assessing the potential for establishing a business code of ethics. Laboratory leaders, clinicians, industry attorneys, ethicists, and consultants participated in the survey, were interviewed, and attended two face-to-face meetings to discuss a way forward. The study demonstrated broad acknowledgment of variations in the legal and regulatory environment, resulting in inconsistent enforcement of industry practices. Study participants expressed agreement that overtly illegal practices sometimes exist, particularly when laboratory representatives and clinicians discuss reimbursement, extent of testing, and potential business incentives with medical practitioners. Most respondents reported directly observing probable violations involving marketing materials, contracts, or, in the case of some individuals, directly soliciting people with offers of clinical supplies and other "freebies." While many study respondents were skeptical that voluntary standards alone would eliminate questionable business practices, most viewed ethics codes and credentialing as an important first step that could potentially mitigate uneven enforcement, while improving quality of care and facilitating preferred payment options for credentialed parties. Many were willing to participate in future discussions and industry-wide initiatives to improve the environment.

  2. Photovoltaic test and demonstration project. [residential energy program

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  3. A "Projective" Test of the Golden Section Hypothesis.

    Science.gov (United States)

    Lee, Chris; Adams-Webber, Jack

    1987-01-01

    In a projective test of the golden section hypothesis, 24 high school students rated themselves and 10 comic strip characters on basis of 12 bipolar constructs. Overall proportion of cartoon figures which subjects assigned to positive poles of constructs was very close to golden section. (Author/NB)

  4. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  5. Project W-314 specific test and evaluation plan 241-AN-B valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  6. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  7. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  8. Project Physics Tests 3, The Triumph of Mechanics.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 3 are presented in this booklet. Included are 70 multiple-choice and 20 problem-and-essay questions. Concepts of mechanics are examined on energy, momentum, kinetic theory of gases, pulse analyses, "heat death," water waves, power, conservation laws, normal distribution, thermodynamic laws, and…

  9. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  10. USL/DBMS NASA/PC R and D project system testing standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  11. Project Physics Tests 2, Motion in the Heavens.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    Test items relating to Project Physics Unit 2 are presented in this booklet. Included are 70 multiple-choice and 22 problem-and-essay questions. Concepts of motion in the heavens are examined for planetary motions, heliocentric theory, forces exerted on the planets, Kepler's laws, gravitational force, Galileo's work, satellite orbits, Jupiter's…

  12. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Report January 2010-August 2015 Coal/ Biomass -to-Liquids Demonstration Testing for DLA Energy Report on Project Tests, Evaluations, and...produced commercially from coal and biomass mixtures while meeting the requirements of Section 526, which requires that GHG emissions from...gasification equipment, coals, and biomass used, and reports and analyzes the test results. Additionally, the team worked with DOE NETL to conduct

  13. Ex-vessel debris coolability test during severe accident (COTELS project)

    International Nuclear Information System (INIS)

    Ogasawara, H.

    1998-01-01

    The objectives of the COTELS project are for severe accident management, to investigate phenomena of ex-vessel fuel-coolant interactions after reactor pressure vessel (RPV) failure and to investigate molten core-concrete interaction when coolant is injected onto molten debris. The project has being cooperated with the National Nuclear Center in the Republic of Kazakstan from 1994 to 1997 under the sponsorship of the Ministry of International Trade and Industry of Japan. Total programs are composed with the following tests. (1) Test 01 was meant to observe flow mode of falling debris. (2) Test A was meant to investigate phenomena of fuel-coolant interactions when molten debris falls into a coolant pool. (3) Test B/C investigated fuel coolant interactions and molten core-concrete interaction when coolant is injected onto debris. Detail data evaluation is underway. The following results were thus for obtained: (1) It was confirmed in Test 01 series that about 60 kg of UO 2 mixture was completely melted and fallen as a continuous jet. (2) No energetic fuel-coolant interaction was observed both in Test A and B series. (3) Debris in which decay heat was simulated was cooled by water injection in Test C series

  14. New Options for Usability Testing Projects in Business Communication Courses

    Science.gov (United States)

    Jameson, Daphne A.

    2013-01-01

    The increasing availability of recording technologies makes it easier to include usability testing projects in business communication courses. Usability testing is a method of discovering whether people can navigate, read, and understand a print or electronic communication well enough to achieve a particular purpose in a reasonable time frame.…

  15. Note: An online testing method for lifetime projection of high power light-emitting diode under accelerated reliability test.

    Science.gov (United States)

    Chen, Qi; Chen, Quan; Luo, Xiaobing

    2014-09-01

    In recent years, due to the fast development of high power light-emitting diode (LED), its lifetime prediction and assessment have become a crucial issue. Although the in situ measurement has been widely used for reliability testing in laser diode community, it has not been applied commonly in LED community. In this paper, an online testing method for LED life projection under accelerated reliability test was proposed and the prototype was built. The optical parametric data were collected. The systematic error and the measuring uncertainty were calculated to be within 0.2% and within 2%, respectively. With this online testing method, experimental data can be acquired continuously and sufficient amount of data can be gathered. Thus, the projection fitting accuracy can be improved (r(2) = 0.954) and testing duration can be shortened.

  16. Official emblem of the Apollo Soyuz Test Project

    Science.gov (United States)

    1974-01-01

    This is the Official emblem of the Apollo Soyuz Test Project (ASTP) chosen by NASA and the Soviet Academy of Sciences. Of circular design, the emblem has the words Apollo in English and Soyuz in Russian around a center disc which depicts the two spacecraft docked together in Earth orbit. The Russian word 'soyuz' means 'union' in English.

  17. The Cosmetics Europe strategy for animal-free genotoxicity testing: project status up-date.

    Science.gov (United States)

    Pfuhler, S; Fautz, R; Ouedraogo, G; Latil, A; Kenny, J; Moore, C; Diembeck, W; Hewitt, N J; Reisinger, K; Barroso, J

    2014-02-01

    The Cosmetics Europe (formerly COLIPA) Genotoxicity Task Force has driven and funded three projects to help address the high rate of misleading positives in in vitro genotoxicity tests: The completed "False Positives" project optimized current mammalian cell assays and showed that the predictive capacity of the in vitro micronucleus assay was improved dramatically by selecting more relevant cells and more sensitive toxicity measures. The on-going "3D skin model" project has been developed and is now validating the use of human reconstructed skin (RS) models in combination with the micronucleus (MN) and Comet assays. These models better reflect the in use conditions of dermally applied products, such as cosmetics. Both assays have demonstrated good inter- and intra-laboratory reproducibility and are entering validation stages. The completed "Metabolism" project investigated enzyme capacities of human skin and RS models. The RS models were shown to have comparable metabolic capacity to native human skin, confirming their usefulness for testing of compounds with dermal exposure. The program has already helped to improve the initial test battery predictivity and the RS projects have provided sound support for their use as a follow-up test in the assessment of the genotoxic hazard of cosmetic ingredients in the absence of in vivo data. Copyright © 2013 Elsevier Ltd. All rights reserved.

  18. Plaadisoovitus

    Index Scriptorium Estoniae

    2005-01-01

    Uutest helisalvestistest "Bodyrockers", Jane Birkin "Randez Vouz", Björk "Yhe Music From Matthew Barney's Drawing Restraint 9", Coldplay "X & Y", Black Eyed Peas "Monkey Business", Static-X "Start a War", Oasis "Don't Believe the Truth", Röyksopp "The Understanding", Gorillaz "Demon Days", Mariah Carey "The Emancipation Of Mimi", James Blunt "Back To Bedlam", Dream Theater "Octavarium"

  19. Project W-314 performance mock-up test procedure

    International Nuclear Information System (INIS)

    CARRATT, R.T.

    1999-01-01

    The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block

  20. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  1. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  2. X-rays of inner worlds: the mid-twentieth-century American projective test movement.

    Science.gov (United States)

    Lemov, Rebecca

    2011-01-01

    This essay begins to tell the neglected history of the projective test movement in the U.S. behavioral sciences from approximately 1941 to 1968. This cross-disciplinary enterprise attempted to use projective techniques as "X-ray" machines to see into the psyches of subjects tested around the world. The aim was to gather subjective materials en masse, pursuing data on a scope, scale, and manner rarely hazarded before in any science. In particular, the targeted data included the traces of the inner life and elusive aspects of subjective experience including dreams, life stories, and myriad test results from a battery of tests. This essay explores how the movement and the experimental data bank that resulted were unlikely yet telling sites for the practice and pursuit of the Cold War human sciences. To look closely at the encounters that resulted is to show how the most out-of-the-way places and seemingly insignificant moments played a role in heady scientific ambitions and global geopolitical projects. At times, the projective test movement became a mirror of Cold War rationality itself, as tests were employed at the very limits of their possible extension. The essay argues for an off-kilter centrality in the movement itself, shedding light on the would-be unified social sciences after World War II and the "subjective turn" they took. © 2011 Wiley Periodicals, Inc.

  3. Virtual Mockup test based on computational science and engineering. Near future technology projected by JSPS-RFTFADVENTURE project

    International Nuclear Information System (INIS)

    Yoshimura, Shinobu

    2001-01-01

    The ADVENTURE project began on August, 1997, as a project in the computational science' field of JSPS-RFTFADVENTURE project, and is progressed as five year project. In this project, by using versatile parallel computer environment such as PC cluster, super parallel computer, and so on , to solve an arbitrary shape of actual dynamical equation by using 10 to 100 million freedom class mode under maintaining a general use analytical capacity agreeable with present general use computational mechanics system, further development of a large-scale parallel computational mechanics system (ADVENTURE system) capable of carrying out an optimization design on shapes, physical properties, loading conditions, and so on is performed. Here was scoped, after outlining on background of R and D on ADVENTURE system and its features, on near future virtual mockup test forecast from it. (G.K.)

  4. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  5. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW`s Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  6. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation

  7. Apollo-Soyuz test project: Composite of MSFC final science report

    Science.gov (United States)

    1977-01-01

    Experimental procedures of nine experiments conducted during the Apollo-Soyuz Test Project mission from July 15th to July 24th, 1975 are presented. Conclusions and recommendations based on these experiments are given.

  8. State of Art Report for the OECD-NEA Loss-of-Forced Cooling (LOFC) Test Project using HTTR Reactor

    International Nuclear Information System (INIS)

    Jun, Ji Su

    2011-05-01

    The OECD/NEA Project is planned to perform the LOFC (Loss Of Forced Cooling) test using the HTTR (High Temperature engineering Test Reactor) in Japan from 31 March 2011 to 31 March 2013 in order to obtain the data for the code validation of the VHTR safety analysis. Based on the Project Agreement Document, this report gives a description of the HTTR-LOFC test, HTTR test facility, project schedule and deliverable items as the technical state art of the project, and appends the full translation of the project agreement articles on the project management

  9. A framework for testing the ability of models to project climate change and its impacts

    DEFF Research Database (Denmark)

    Refsgaard, J. C.; Madsen, H.; Andréassian, V.

    2014-01-01

    Models used for climate change impact projections are typically not tested for simulation beyond current climate conditions. Since we have no data truly reflecting future conditions, a key challenge in this respect is to rigorously test models using proxies of future conditions. This paper presents...... a validation framework and guiding principles applicable across earth science disciplines for testing the capability of models to project future climate change and its impacts. Model test schemes comprising split-sample tests, differential split-sample tests and proxy site tests are discussed in relation...... to their application for projections by use of single models, ensemble modelling and space-time-substitution and in relation to use of different data from historical time series, paleo data and controlled experiments. We recommend that differential-split sample tests should be performed with best available proxy data...

  10. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  11. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  12. Psychometry and Pescatori projective test in coloproctological patients

    OpenAIRE

    dos Santos, Ana Célia Caetano Catarino; Oliveira, Dinis; Gomes, Zaida; Mesquita, Edgar; Gonçalves, Carla Rolanda Rocha

    2017-01-01

    Background Psychological assessment is not commonly performed nor easily accepted by coloproctological patients. Our aim was to evaluate the psychological component of coloproctological disorders using uncommon tools. Methods The 21-Item Depression Anxiety and Stress Scale and the Pescatori projective test were applied to coloproctological outpatients of the Gastroenterology Department of our hospital as well as to healthy volunteers. Results Seventy patients (median age 47 years, 2...

  13. Level of Aspiration, Risk-Taking Behavior, and Projective Test Performance: A Search for Coherence

    Science.gov (United States)

    Lefcourt, Herbert M.; Steffy, Richard A.

    1970-01-01

    Correlations were obtained between level of aspiration, gambling, and projective test variables. Achievement oriented behaviors in the level of aspiration task and in the gambling task were related to each other, and both were related to the adequacy of response to sexual stimuli in projective testing. Reprints from Herbert M. Lefcourt, Department…

  14. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations

  15. Psychological characteristics of eating disorders as evidenced by the combined administration of questionnaires and two projective methods: the Tree Drawing Test (Baum Test) and the Sentence Completion Test.

    Science.gov (United States)

    Mizuta, Ichiro; Inoue, Yoichi; Fukunaga, Tomoko; Ishi, Ryohei; Ogawa, Asao; Takeda, Masatoshi

    2002-02-01

    The objective of this study is to examine psychological/psychopathological characteristics of eating disorders and their subtypes through a combined administration of questionnaires and projective tests. Three questionnaires (Eating Disorder Inventory - 2, Social Adaptation Scale, Southern California University Eating Disorder Inventory - Revised) and two projective tests (the Tree Drawing Test [TDT, Baum Test], and the Sentence Completion Test [SCT]) were administered to 126 female patients between the ages of 15 and 30 years, with eating disorders according to DSM-IV criteria at our outpatient clinic, and to 54 sex- and age-matched control subjects. The purging subtypes of eating disorders (anorexia nervosa - binge-eating/purging type [ANBP] and bulimia nervosa - purging type [BNP]) were clearly differentiated from the controls, both by the questionnaires and the projective tests. Compared with the controls, ANBP/BNP showed more problematic profiles across the three questionnaires, drew smaller and poorer trees in TDT to a more left location on the drawing paper, and gave fewer positive, and more negative responses in SCT. In contrast, few significant differences were found between anorexia nervosa- restricting type (ANR) and the controls, and between ANBP and BNP. As a trend, however, ANR was consistently located between the controls and ANBP/BNP across the whole questionnaires and projective tests.

  16. Project Protect” intervention. Testing a new approach for HIV prevention

    Directory of Open Access Journals (Sweden)

    Vasylyeva, Tetyana

    2012-07-01

    Full Text Available BACKGROUND. “Project Protect” aims to find highly infectious individuals through screening for acute/recent infection cases and prevent HIV transmission in the risk networks of these cases through contact tracing of these networks` participants, distributing community alerts about risk of acute infection among them and accurate post-test counseling.METHODS. An ongoing pilot phase of the intervention began in Kriviy Rig and Lviv, Ukraine in November, 2011. Participants are recruited through: 1 screening for cases of acute/recent infection at voluntary counseling and testing (VCT sites and in partner organizations (including AIDS-Centers which conduct VCT; 2 visits to drug use venues, chain-referral and contact tracing. Genscreen ultra HIV Ag-Ab “special-tests” are used to detect cases of acute infection. Recent infection is defined as positive test result and preceding negative result within 6 months and/or age younger than 21 years old.RESULTS. In the two cities 173 respondents were recruited to the project, 118 special tests were done. No cases of acute infection and eleven cases of recent infection were found (8 injection drug users (IDUs with preceding negative result within 6 months, 2 IDUs younger than 21 recruited by project team; one non-IDU with preceding negative result within 6 months referred from AIDS-Center. Six recent cases were recruited through screening at VCT sites, 5 others through contact tracing. Psychologists conducted 41 interviews with recent infection cases and their risk networks` members; 176 community alert flyers were distributed to members of risk networks during the interview by psychologist, at the venue by social worker and by participants themselves; 3 drug use venues were visited by project team with concomitant HIV-testing of people present at the venue. CONCLUSIONS. Network tracing seems to be feasible and to help find recently infected people. Further research is needed to tell whether this

  17. Medical microbiological analysis of Apollo-Soyuz test project crewmembers

    Science.gov (United States)

    Taylor, G. R.; Zaloguev, S. N.

    1976-01-01

    The procedures and results of the Microbial Exchange Experiment (AR-002) of the Apollo-Soyuz Test Project are described. Included in the discussion of procedural aspects are methods and materials, in-flight microbial specimen collection, and preliminary analysis of microbial specimens. Medically important microorganisms recovered from both Apollo and Soyuz crewmen are evaluated.

  18. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  19. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  20. Clinical identification of compensatory structures on projective tests: a self psychological approach.

    Science.gov (United States)

    Silverstein, M L

    2001-06-01

    In this article I discuss compensatory structure, a concept from Kohut's (1971, 1977) psychology of the self that is not as familiar as Kohut's other views about the self. Compensatory structures are attempts to repair selfobject failure, usually by strengthening idealization or twinship in the face of mirroring deficits. Compensatory structures, particularly their early indications, can be detected on projective tests for identifying adaptive resources and treatment potential. The clinical identification of compensatory structures on test findings is described using Rorschach and Thematic Apperception Test (Murray, 1943) content. Particular attention is devoted to the 2-part process of demonstrating first, an injury to the self, and second, how attempts to recover from such injuries can be detected on projective tests. Clinical examples are provided, and the differentiation between compensatory structures and defenses and sublimation is discussed.

  1. Beyond "objective" and "projective": a logical system for classifying psychological tests: comment on Meyer and Kurtz (2006).

    Science.gov (United States)

    Wagner, Edwin E

    2008-07-01

    I present a formal system that accounts for the misleading distinction between tests formerly termed objective and projective, duly noted by Meyer and Kurtz (2006). Three principles of Response Rightness, Response Latitude and Stimulus Ambiguity are shown to govern, in combination, the formal operating characteristics of tests, producing inevitable overlap between "objective" and "projective" tests and creating at least three "types" of tests historically regarded as being projective in nature. The system resolves many past issues regarding test classification and can be generalized to include all psychological tests.

  2. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  3. Fuel Retrieval Sub-Project (FRS) Stuck Fuel Station Performance Test Data Report

    International Nuclear Information System (INIS)

    THIELGES, J.R.

    2000-01-01

    This document provides the test data report for Stuck Fuel Station Performance Testing in support of the Fuel Retrieval Sub-Project. The stuck fuel station was designed to provide a means of cutting open a canister barrel to release fuel elements, etc

  4. UAS Integration in the NAS Project: Integrated Test and Evaluation (IT&E) Flight Test 3. Revision E

    Science.gov (United States)

    Marston, Michael

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  5. Summary of the Atmospheric Test Data (Film Scanning and Re-Analysis) Project at LLNL

    Energy Technology Data Exchange (ETDEWEB)

    Murray, S. D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-03-21

    The goal of the Atmospheric Test Data (ATD) Project is to preserve and make better use of scientific-quality films that were taken during the era of above ground nuclear testing. The project is being done in collaboration with Los Alamos National Laboratory, which is the custodian of the films. Our primary points of contact at LANL have been Alan Carr, Carla Breiner, and Randy Drake.

  6. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  7. Repository-relevant testing applied to the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.; Veleckis, E.

    1989-04-01

    A repository environment poses a challenge to developing a testing program because of the diverse nature of conditions that may exist at a given time during the life of the repository. A starting point is to identify whether any potential waste-water contact modes are particularly deleterious to the waste form performance, and whether any interactions between materials present in the waste package environment need to be accounted for during modeling the waste form reaction. The Unsaturated Test method in one approach that has been developed by the Yucca Mountain Project (YMP) to investigate the above issues, and a description of results that have been obtained during the testing of glass and unirradiated UO 2 are the subject of this report. 10 refs., 7 figs., 4 tabs

  8. Design of a testing strategy using non-animal based test methods: lessons learnt from the ACuteTox project.

    Science.gov (United States)

    Kopp-Schneider, Annette; Prieto, Pilar; Kinsner-Ovaskainen, Agnieszka; Stanzel, Sven

    2013-06-01

    In the framework of toxicology, a testing strategy can be viewed as a series of steps which are taken to come to a final prediction about a characteristic of a compound under study. The testing strategy is performed as a single-step procedure, usually called a test battery, using simultaneously all information collected on different endpoints, or as tiered approach in which a decision tree is followed. Design of a testing strategy involves statistical considerations, such as the development of a statistical prediction model. During the EU FP6 ACuteTox project, several prediction models were proposed on the basis of statistical classification algorithms which we illustrate here. The final choice of testing strategies was not based on statistical considerations alone. However, without thorough statistical evaluations a testing strategy cannot be identified. We present here a number of observations made from the statistical viewpoint which relate to the development of testing strategies. The points we make were derived from problems we had to deal with during the evaluation of this large research project. A central issue during the development of a prediction model is the danger of overfitting. Procedures are presented to deal with this challenge. Copyright © 2012 Elsevier Ltd. All rights reserved.

  9. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  10. Experimental Results of A1.1 Test for OECD-ATLAS Project

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Kyoung-Ho; Bae, Byoung-Uhn; Park, Yu-Sun; Kim, Jong-Rok; Choi, Nam-Hyun; Choi, Ki-Yong [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    KAERI (Korea Atomic Energy Research Institute) is operating an OECD/NEA project (hereafter, OECD-ATLAS project) by utilizing a thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation). Considering the importance of the SBO scenario and the related accident mitigation measures, a prolonged SBO scenario was selected as the first test subject worthy of investigation in the OECD-ATLAS project as summarized in Table 1. After the Fukushima accident, design extension conditions (DECs) such as an SBO and a total loss of feed water (TLOFW) attracted wide international attention in that such high-risk multiple failure accidents should be revisited from the viewpoint of the reinforcement of the 'defense in depth' concept. In particular, an SBO is one of the most important DECs because a total loss of heat sink can lead to a core melt-down scenario under high pressure without any proper operator action. As for a prolonged SBO transient of the OECD-ATLAS project, two tests, named A1.1 and A1.2, were determined to be performed. In most nuclear power plants (NPPs), a turbine-driven auxiliary feedwater system was designed to remove the decay heat during the early period of an SBO transient. From a conservative point of view, however, it is necessary to investigate the thermal-hydraulic behaviors of the NPP when a turbine-driven auxiliary feedwater supply is not available during the initial period of an SBO transient and moreover a mobile pump-driven auxiliary feedwater supply can only become realized in the later period of the scenario. In particular, asymmetric heat removal characteristic through the supply of auxiliary feedwater only to one steam generator has its own peculiar importance in terms of safety analysis code validation. With an aim of considering these safety importance, in the A1.1 test, a prolonged SBO transient was simulated with two temporal phases: Phase (I) for a conservative SBO transient

  11. [Attachment representation and a projective test with pictures of parent-child interaction].

    Science.gov (United States)

    Kubo, M

    2000-02-01

    The purpose of this study was to assess individual differences in attachment representation. They were assessed, not through direct verbal reports, but indirectly as indicated in a projective test. The test required subjects to tell their impressions of pictures, which depicted daily, routine parent-child interactions. A series of pictures were developed for story-making task, which was named PARS (Picture Attachment Related Study). Three hundred and two (302) undergraduate and vocational students were asked to see the pictures, and freely imagine the situation, think what they would feel, and create the further story. They were then to recall their own experiences with their parents, and fill out a questionnaire of how they see their relationship with others. It was found that those who made a trustful PARS story recalled their own attachment experiences in an autonomous way, and had lower distrust in their relationship with others. Thus, results of the projective test were shown to reflect individual personal attachment experiences, and the test be useful.

  12. Evaluation of the radionuclide tracer test conducted at the project Gnome Underground Nuclear Test Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, G.; Pohlmann, K.

    1996-08-01

    A radionuclide tracer test was conducted in 1963 by the U.S. Geological Survey at the Project Gnome underground nuclear test site, approximately 40 km southeast of Carlsbad, New Mexico. The tracer study was carried out under the auspices of the U.S. Atomic Energy Commission (AEC) to study the transport behavior of radionuclides in fractured rock aquifers. The Culebra Dolomite was chosen for the test because it was considered to be a reasonable analogue of the fractured carbonate aquifer at the Nevada Test Site (NTS), the principal location of U.S. underground nuclear tests. Project Gnome was one of a small number of underground nuclear tests conducted by the AEC at sites distant from the NTS. The Gnome device was detonated on December 10, 1961 in an evaporate unit at a depth of 360 m below ground surface. Recently, the U.S. Department of Energy (DOE) implemented an environmental restoration program to characterize, remediate, and close these offsite nuclear test areas. An early step in this process is performance of a preliminary risk analysis of the hazard posed by each site. The Desert Research Institute has performed preliminary hydrologic risk evaluations for the groundwater transport pathway at Gnome. That evaluation included the radioactive tracer test as a possible source because the test introduced radionuclides directly into the Culebra Dolomite, which is the only aquifer at the site. This report presents a preliminary evaluation of the radionuclide tracer test as a source for radionuclide migration in the Culebra Dolomite. The results of this study will assist in planning site characterization activities and refining estimates of the radionuclide source for comprehensive models of groundwater transport st the Gnome site

  13. Design and testing of a perimeter of increment threshold by projection

    OpenAIRE

    García Domene, María del Carmen; Luque Cobija, María José; Fez Saiz, Dolores de

    2017-01-01

    In the present study, we have designed and tested a perimeter for the detection of damage in the chromatic mechanisms using a video projector. To this purpose, we have characterized pixel to pixel a video projector, to account for the inhomogeneities in the projection. We have measured the tristimulus values of the projector primaries as a function of digital level, at 49 locations of the projection screen and, from them, we have arrived to a characterization model which reduces the color dif...

  14. Final project report: High energy rotor development, test and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  15. Profile of Students' Creative Thinking Skills on Quantitative Project-Based Protein Testing using Local Materials

    Directory of Open Access Journals (Sweden)

    D. K. Sari

    2017-04-01

    Full Text Available The purpose of this study is to obtain a profile of students’ creative thinking skills on quantitative project-based protein testing using local materials. Implementation of the research is using quasi-experimental method pre-test post-test control group design with 40 students involved in Biochemistry lab. The research instrument is pre-test and post-test using creative thinking skills in the form of description and students’ questionnaire. The analysis was performed with SPSS 22.0 program to see the significance normality, U Mann-Whitney test for nonparametric statistics, N-Gain score, and the percentage of student responses to the practicum performed. The research result shows that the pretest rate in the experimental group is 8.25 while in the control group is 6.90. After attending a project-based practicum with local materials, the experimental group obtained the mean of posttest is 37.55 while in control class is 11.18. The students’ improvement on creative thinking skills can be seen from the average of N-Gain in the experimental class with 0.32 (medium category and in the control category with 0.05 (low category. The experimental and control class have different creative thinking skills significantly different fluency, flexibility, novelty, and detail. It can be concluded that quantitative project-based protein testing using local materials can improve students’ creative thinking skills. 71% of total students feel that quantitative project-based protein testing using local materials make them more creative in doing a practicum in the laboratory.

  16. Offsite testing in support of the Salt Repository Project

    International Nuclear Information System (INIS)

    Kalia, H.N.

    1987-04-01

    This report presents a rationale and recommendation to perform an offsite testing program in support of the Salt Repository Project. The investigation to be performed primarily consists of qualifying test methods and procedures, qualifying personnel-training procedures, evaluating test instruments and selected equipment, and obtaining mining and production equipment performance-related information. The key objective of these activities is to develop capabilities to be used at the exploratory shaft facility (ESF). The ESF is to be excavated at the Deaf Smith County site to characterize the salt site for the construction of a repository used to isolate radioactive waste from the biosphere. The bulk of the offsite testing work will be performed at Avery Island Salt Mine at New Iberia, Lousiana. Additional knowledge will be obtained by exchanging technical information either as participants or as observers at the Waste Isolation Pilot Plant (WIPP) site and the Asse Mine in the Federal Republic of Germany (FRG). It is estimated that the offsite testing program will cost approximately $9.3 million over 4 fiscal years. 14 refs., 1 fig., 8 tabs

  17. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  18. Assessment of the Nevada Test Site as a Site for Distributed Resource Testing and Project Plan: March 2002

    Energy Technology Data Exchange (ETDEWEB)

    Horgan, S.; Iannucci, J.; Whitaker, C.; Cibulka, L.; Erdman, W.

    2002-05-01

    The objective of this project was to evaluate the Nevada Test Site (NTS) as a location for performing dedicated, in-depth testing of distributed resources (DR) integrated with the electric distribution system. In this large scale testing, it is desired to operate multiple DRs and loads in an actual operating environment, in a series of controlled tests to concentrate on issues of interest to the DR community. This report includes an inventory of existing facilities at NTS, an assessment of site attributes in relation to DR testing requirements, and an evaluation of the feasibility and cost of upgrades to the site that would make it a fully qualified DR testing facility.

  19. Archeology and Native American Religion at the Leon River Medicine Wheel.

    Science.gov (United States)

    1996-02-01

    varieties of plants. The eastern side of including pecan (Carya illinoinensis), slippery elm the facility (East Range) is typified by dense (Ulmus rubra...southern part of the Cross Timbers and Prairies texana), and cedar elm (Ulmus crassifolia). A Vegetation Area. Alired and Mitchell (1955) term variety of...south (West Fort americana), American elm (Ulmus americana), Hood) are generally more open, ranging from TRC MARIAH ASSOCIATES, INC. (662-21

  20. Preliminary project definition for long duration. Tests of coal fired MHD generators

    International Nuclear Information System (INIS)

    Van der Laken, R.A.

    1992-01-01

    In its final report the Faraday Working Group recommended the CEC amongst others to explore the possibility of a long duration test of a 'state-of-the-art', MHD-generator in order to remove uncertainties concerning the lifetime and availability of such a generator design. The duration of the test should be several thousands of hours, considerably more than the duration tests carried out until now. The scope of the present study is to prepare a project definition document for a long duration test of a coal fired, state-of-the-art MHD-generator

  1. Pre-service proof pressure and leak rate tests for the Qinshan CANDU project reactor buildings

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The Qinshan CANDU Project Reactor Buildings (Units 1 and 2) have been successfully tested for the Pre-Service Proof Pressure and Integrated Leak Rate Tests. The Unit 1 tests took place from May 3 to May 9, 2002 and from May 22 to May 25, 2002, and the Unit 2 tests took place from January 21 to January 27, 2003. This paper discusses the significant steps taken at minimum cost on the Qinshan CANDU Project, which has resulted in a) very good leak rate (0.21%) for Unit 1 and excellent leak rate (0.130%) for Unit 2; b) continuous monitoring of the structural behaviour during the Proof Pressure Test, thus eliminating any repeat of the structural test due to lack of data; and c) significant schedule reduction achieved for these tests in Unit 2. (author)

  2. Cost/schedule performance measurement system utilized on the Fast Flux Test Facility project

    International Nuclear Information System (INIS)

    Brown, R.K.; Frost, R.A.; Zimmerman, F.M.

    1976-01-01

    An Earned Value-Integrated Cost/Schedule Performance Measurement System has been applied to a major nonmilitary nuclear design and construction project. This system is similar to the Department of Defense Cost/Schedule Performance Measurement System. The project is the Fast Flux Test Facility (a Fuels and Materials test reactor for the Liquid Metal Fast Breeder Reactor Program) being built at the Hanford Engineering Development Laboratory, Richland, Washington, by Westinghouse Hanford Company for the U. S. Energy Research and Development Administration. Because the project was well into the construction phase when the Earned Value System was being considered, it was decided that the principles of DOD's Cost/Schedule Control System Criteria would be applied to the extent possible but no major changes in accounting practices or management systems were imposed. Implementation of this system enabled the following questions to be answered: For work performed, how do actual costs compare with the budget for that work. What is the impact of cost and schedule variances at an overall project level composed of different kinds of activities. Without the Earned Value system, these questions could be answered in a qualitative, subjective manner at best

  3. Irradiated test fuel shipment plan for the LWR MOX fuel irradiation test project

    International Nuclear Information System (INIS)

    Shappert, L.B.; Dickerson, L.S.; Ludwig, S.B.

    1998-01-01

    This document outlines the responsibilities of DOE, DOE contractors, the commercial carrier, and other organizations participating in a shipping campaign of irradiated test specimen capsules containing mixed-oxide (MOX) fuel from the Idaho National Engineering and Environmental Laboratory (INEEL) to the Oak Ridge National Laboratory (ORNL). The shipments described here will be conducted according to applicable regulations of the US Department of Transportation (DOT), US Nuclear Regulatory Commission (NRC), and all applicable DOE Orders. This Irradiated Test Fuel Shipment Plan for the LWR MOX Fuel Irradiation Test Project addresses the shipments of a small number of irradiated test specimen capsules and has been reviewed and agreed to by INEEL and ORNL (as participants in the shipment campaign). Minor refinements to data entries in this plan, such as actual shipment dates, exact quantities and characteristics of materials to be shipped, and final approved shipment routing, will be communicated between the shipper, receiver, and carrier, as needed, using faxes, e-mail, official shipping papers, or other backup documents (e.g., shipment safety evaluations). Any major changes in responsibilities or data beyond refinements of dates and quantities of material will be prepared as additional revisions to this document and will undergo a full review and approval cycle

  4. Overview of fuel testing capabilities at the OECD Halden reactor project

    Energy Technology Data Exchange (ETDEWEB)

    Wiesenack, W [Institutt for Atomenergi, Halden (Norway). OECD Halden Reaktor Projekt

    1994-12-31

    Fuel performance and reliability investigations at the OECD Haiden Reactor Project are described. They are supported by a variety of irradiation rigs, suitable irradiation techniques and a range of instrumentation. Testing capabilities and applications are mainly aimed at exploring mechanisms of fuel behaviour and high burnup. Examples of fuel performance taken from data provided by the Halden Project for the IAEA Co-ordinated Research Programme FUMEX are presented. A number of heavily instrumented rigs to suit different test objects have been developed: base irradiation rig, gas meter rig, diameter measurement rig, ramp rig, gas flow rig, instrumented fuel assembly. In core-measurements and variety of sensors as : fuel thermocouples, bellows pressure transducers, fuel stack elongation detectors, cladding diameter gauge and cladding elongation detectors have been used. Techniques which make it possible to obtain reliable data for all relevant burnups from beginning-of-life to ultra high exposure reaching 100 Mwd/kg UO{sub 2} are described. 7 figs., 3 refs.

  5. Child-Robot Interaction in the Wild : Field Testing Activities of the ALIZ-E Project

    NARCIS (Netherlands)

    Greeff, J. de; Blanson Henkemans, O.A.; Fraaije, A.; Solms, L.; Wigdor, N.; Bierman, B.

    2014-01-01

    A field study was conducted in which CRI activities developed by the ALIZ-E project were tested with the project's primary user group: children with diabetes. This field study resulted in new insights in the modalities and roles a robot aimed at CRI in a healthcare setting might utilise, while in

  6. The International intraval project. Phase 1 test cases

    International Nuclear Information System (INIS)

    1992-01-01

    This report contains a description of the test cases adopted in Phase 1 of the international cooperation project INTRAVAL. Seventeen test cases based on bench-scale experiments in laboratory, field tests and natural analogue studies, have been included in the study. The test cases are described in terms of experimental design and types of available data. In addition, some quantitative examples of available data are given as well as references to more extensive documentation of the experiments on which the test cases are based. Fithteen test cases examples are given: 1 Mass transfer through clay by diffusion and advection. 2 Uranium migration in crystalline bore cores, small scale pressure infiltration experiments. 3 Radionuclide migration in single natural fractures in granite. 4 Tracer tests in a deep basalt flow top. 5 Flow and tracer experiment in crystalline rock based on the Stripa 3-D experiment. 6 Tracer experiment in a fracture zone at the Finnsjon research area. 7 Synthetic data base, based on single fracture migration experiments in Grimsel rock laboratory. 8 Natural analogue studies at Pocos de Caldas, Minais Gerais, Brazil. Redox-front and radionuclide movement in an open pit uranium mine. 9 Natural analogue studies at the Koongarra site in the Alligator Rivers area of the Northern Territory, Australia. 10 Large block migration experiments in a block of crystalline rock. 11 Unsaturated flow and transport experiments performed at Las Cruces, New Mexico. 12 Flow and transport experiment in unsaturated fractured rock performed at the Apache Leap Tuff site, Arizona. 13 Experiments in partially saturated tuffaceous rocks performed in the G-tunnel underground facility at the Nevada Test site, USA. 14 Experimental study of brine transport in porous media. 15 Groundwater flow in the vicinity of the Gorleben Salt Dome, Federal Republic of Germany

  7. Validation of the Arabic Version of the Group Personality Projective Test among university students in Bahrain.

    Science.gov (United States)

    Al-Musawi, Nu'man M

    2003-04-01

    Using confirmatory factor analytic techniques on data generated from 200 students enrolled at the University of Bahrain, we obtained some construct validity and reliability data for the Arabic Version of the 1961 Group Personality Projective Test by Cassel and Khan. In contrast to the 5-factor model proposed for the Group Personality Projective Test, a 6-factor solution appeared justified for the Arabic Version of this test, suggesting some variance between the cultural groups in the United States and in Bahrain.

  8. Transitioning the GED[R] Mathematics Test to Computer with and without Accommodations: A Pilot Project

    Science.gov (United States)

    Patterson, Margaret Becker; Higgins, Jennifer; Bozman, Martha; Katz, Michael

    2011-01-01

    We conducted a pilot study to see how the GED Mathematics Test could be administered on computer with embedded accessibility tools. We examined test scores and test-taker experience. Nineteen GED test centers across five states and 216 randomly assigned GED Tests candidates participated in the project. GED candidates completed two GED mathematics…

  9. Project W-314 specific test and evaluation plan for SN-633 transfer line (241-AX-B to 241-AY-02A)

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation

  10. United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

    Energy Technology Data Exchange (ETDEWEB)

    Hack, Horst [Electric Power Research Institute (EPRI); Purgert, Robert Michael [Energy Industries of Ohio

    2017-12-13

    Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO2 emissions, compared to CO2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760

  11. Sound / Märt Milter

    Index Scriptorium Estoniae

    Milter, Märt

    1998-01-01

    Uutest plaatidest Mötley Crüe "Greatest Hits", Mariah Carey "# 1s", Pearl Jam "Live On Two Legs", Linda McCartney "Wide Prairie", Method Man "Tical 2000 : Judgement Day", Nada Surf "The Proximity Effect", Stina Nordenstam "People Are Strange", Portishead "Roseland NYC Live", Maggie Reilly "There and Back Again", Ǹ Sync "The Winter Album", Terminaator "Singapur", Zucchero "Bluesugar", George Michael "Ladies & Gentlemen".Best Of" ja Eric B & Rakim "Paid In Full.The Platinum Edition"

  12. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  13. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  14. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  15. Project W-151 flexible receiver radiation detector system acceptance test plan. Revision 1

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1994-01-01

    The attached document is the Acceptance Test Plan for the portion of Project W-151 dealing with acceptance of gamma-ray detectors and associated electronics manufactured at the Idaho National Engineering Laboratory (INEL). The document provides a written basis for testing the detector system, which will take place in the 305 building (300 Area)

  16. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    Kan, T.

    1998-01-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  17. Design and simulation of the rotating test rig in the INDUFLAP project

    DEFF Research Database (Denmark)

    Barlas, Thanasis K.; Aagaard Madsen, Helge; Løgstrup Andersen, Tom

    The general description and objectives of the rotating test rig at the Risø campus of DTU are presented, as used for the aeroelastic testing of a controllable rubber trailing edge flap (CRTEF) system in the INDUFLAP project. The design of all new components is presented, including the electrical...... drive, the pitch system, the boom, and the wing/flap section. The overall instrumentation of the components used for the aeroelastic testing is described. Moreover, the aeroelastic model simulating the setup is described, and predictions of steady and dynamic loading along with the aeroelastic analysis...

  18. LOT Project long term test of buffer material at the Aespoe HRL

    International Nuclear Information System (INIS)

    Karnland, O.; Olsson, S.; Dueck, A.; Birgersson, M.; Nilsson, U.; Hernan-Haakansson, T.; Pedersen, K.; Eriksson, S.; Eriksen, T.; Eriksson, S.; Rosborg, B.; Muurinen, A.; Rousset, D.; Mosser-Ruck, R.; Cathelineau, M.; Villieras, F.; Pelletier, M.; Kaufold, S.; Dohrmann, R.; Fernandez, R.; Maeder, U.; Koroleva, M.

    2010-01-01

    year test parcel (A0). The parcels A0 and A2 are finalized and the basic tests and analyzes are made. The most important general and specific results from the analyzed parcels may be summarized as: - reorganization of easily dissolved accessory minerals e.g. gypsum; - increase in cation exchange capacity in the warm parts of the A2 parcel; - changed rheological properties (reduced strain at failure) in warm sections in parcel A2; - expected diffusive transport of trace elements; - expected corrosion rate of metallic copper; - no or insignificant bacterial activity. The LOT project was initiated and is financed by SKB (Sweden). Posiva have contributed from project start by financing clay water analyses performed by VTT. As from the last analyzed A2 parcel, also ANDRA (France), BGR (Germany) and Nagra (Switzerland) have joined the project by financing parallel independent mineralogical analyses performed by laboratories in these countries, respectively. (authors)

  19. Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project

    Energy Technology Data Exchange (ETDEWEB)

    A. B. Culp

    2007-01-26

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

  20. CENRTC Project number-sign 2F3EOA, OCB A-376, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3E0A, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00041/M. This procedure separates three tests into separate sections: energization of A-376 duplex panel and circuits; SCADA tests; and A-376 local trip tests

  1. Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL

    International Nuclear Information System (INIS)

    1994-10-01

    The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project

  2. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  3. Fuel integrity project: analysis of light water reactor fuel rods test results

    International Nuclear Information System (INIS)

    Dallongeville, M.; Werle, J.; McCreesh, G.

    2004-01-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  4. Fuel integrity project: analysis of light water reactor fuel rods test results

    Energy Technology Data Exchange (ETDEWEB)

    Dallongeville, M.; Werle, J. [COGEMA Logistics (AREVA Group) (France); McCreesh, G. [BNFL Nuclear Sciences and Technology Services (United Kingdom)

    2004-07-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  5. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  6. An overview of the fuels and materials testing programme at the OECD Halden Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Wiesenack, W [Institutt for Energiteknikk, Halden (Norway). OECD Halden Reaktor Projekt

    1997-08-01

    The fuels and materials testing programme of the OECD Halden Reactor Project is aimed at investigations of fuel and cladding properties at high burnup, water chemistry effects and in-core materials ageing problems. For the execution of this programme, different types of irradiation rigs and experimental facilities providing typical power reactors conditions are available. Data are obtained from in-core sensors developed at the Halden Project; these are shortly described. An overview of the current test programme and the scope of the following years are briefly presented. (author). 5 refs, 3 figs.

  7. Summary of the First High-Altitude, Supersonic Flight Dynamics Test for the Low-Density Supersonic Decelerator Project

    Science.gov (United States)

    Clark, Ian G.; Adler, Mark; Manning, Rob

    2015-01-01

    NASA's Low-Density Supersonic Decelerator Project is developing and testing the next generation of supersonic aerodynamic decelerators for planetary entry. A key element of that development is the testing of full-scale articles in conditions relevant to their intended use, primarily the tenuous Mars atmosphere. To achieve this testing, the LDSD project developed a test architecture similar to that used by the Viking Project in the early 1970's for the qualification of their supersonic parachute. A large, helium filled scientific balloon is used to hoist a 4.7 m blunt body test vehicle to an altitude of approximately 32 kilometers. The test vehicle is released from the balloon, spun up for gyroscopic stability, and accelerated to over four times the speed of sound and an altitude of 50 kilometers using a large solid rocket motor. Once at those conditions, the vehicle is despun and the test period begins. The first flight of this architecture occurred on June 28th of 2014. Though primarily a shake out flight of the new test system, the flight was also able to achieve an early test of two of the LDSD technologies, a large 6 m diameter Supersonic Inflatable Aerodynamic Decelerator (SIAD) and a large, 30.5 m nominal diameter supersonic parachute. This paper summarizes this first flight.

  8. Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

    Science.gov (United States)

    Valkov, Steffi B.; Sternberg, Daniel; Marston, Michael

    2018-01-01

    The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries.

  9. Results of single borehole hydraulic tests in the Mizunami Underground Research Laboratory project. FY 2012 - FY 2015

    International Nuclear Information System (INIS)

    Onoe, Hironori; Takeuchi, Ryuji

    2016-11-01

    This report summarize the results of the single borehole hydraulic tests of 151 sections carried out at the -300 m Stage and the -500 m Stage of the Mizunami Underground Research Laboratory from FY 2012 to FY 2015. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical methods used are presented in this report. Furthermore, the previous results of the single borehole hydraulic tests carried out in the Regional Hydrogeological Study Project and the Mizunami Underground Research Laboratory Project before FY 2012 are also summarized in this report. (author)

  10. The Bears Family Projective Test: evaluating stories of children with emotional difficulties.

    Science.gov (United States)

    Iandolo, Giuseppe; Esposito, Gianluca; Venuti, Paola

    2012-06-01

    The aim of this study was to describe and analyze the storytelling of children with emotional difficulties. Forty children with emotional and relational difficulties (inhibited and impulsive), ages between 5.5 and 9.4 years old, were assessed by a multiaxial procedure and the bears family projective test. The bears family test is a constructive-thematic-projective method based on an anthropomorphic family of bears that children can manipulate to tell a story. The stories of 40 children without emotional difficulties (matched by IQ, socio-economic status, and gender) and 322 typically developing children, aged between four and 10 years old, were used as a reference for comparisons. Results indicated that the stories of children with emotional difficulties showed many unsolved problematic events, unclear characters, negative relationships, and negative behaviors. Unlike the stories of children without emotional difficulties, positive contents didn't prevail over negative, and there wasn't a positive compensation for negative elements.

  11. CENRTC Project number-sign 2F3EOA, OCB A-386, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC number-sign 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests

  12. Test Plan for Hydrogen Getters Project - Phase II

    International Nuclear Information System (INIS)

    Mroz, G.

    1999-01-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (''poison'') the effectiveness of the hydrogen getter. The result of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP. Phase II for the Hydrogen Getters Project will focus on four primary objectives: Conduct measurements of the relative permeability of hydrogen and chlorinated VOCs through Tedlar (and possibly other candidate packaging materials) Test alternative getter systems as alternatives to semi-permeable packaging materials. Candidates include DEB/Pd/Al2O3 and DEB/Cu-Pd/C. Develop, test, and deploy kinetic optimization model Perform drum-scale test experiments to demonstrate getter effectiveness

  13. Results of single borehole hydraulic testing in the Mizunami Underground Research Laboratory project. Phase 2

    International Nuclear Information System (INIS)

    Daimaru, Shuji; Takeuchi, Ryuji; Onoe, Hironori; Saegusa, Hiromitsu

    2012-09-01

    This report summarize the results of the single borehole hydraulic tests of 79 sections conducted as part of the Construction phase (Phase 2) in the Mizunami Underground Research Laboratory (MIU) Project. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical method used are presented in this report. (author)

  14. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Walter, W. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  15. Project of law relative to the sanitary consequences of French nuclear weapons tests

    International Nuclear Information System (INIS)

    2009-05-01

    In order to make easy the indemnifications and to include the persons having participate to nuclear weapons tests (Sahara and French Polynesia) and populations leaving in the concerned areas, the project of law relative to the repair of sanitary consequences of nuclear weapons tests proposes to create a right to integral repair of prejudices for the persons suffering of a radioinduced disease coming from these tests. The American example and the British example are given for comparison. The modalities of financing are detailed as well as the social economic and administrative impacts. (N.C.)

  16. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  17. Planning calculations of spray tests for the ERCOSAM-SAMARA project

    Energy Technology Data Exchange (ETDEWEB)

    Liang, Z. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Andreani, M. [Paul Scherrer Institut, Laboratory for Thermal-Hydraulics, Villigen (Switzerland)

    2012-07-01

    Within the framework of the ERCOSAM-SAMARA project, co-funded by the European Union and the Russian State Atomic Energy Corporation, planning and pre-test calculations are performed to examine sensitivity parameters that can affect the break-up (erosion) of a helium (substitute for hydrogen) layer by mitigation devices (i.e., cooler, spray, or Passive Autocatalytic Recombiner - PAR). This paper reports the GOTHIC analysis results for the spray tests to be performed in the PANDA facility. The effects of spray flow rate, temperature and injection height on depressurization, erosion of helium cloud and gas transport behavior are studied. This analysis is valuable because only a limited number of conditions will be examined in the planned experiments. The study provides a useful understanding of the interaction of spray with a stratified atmosphere. (author)

  18. Final Project Report on RCCS Testing with Air-based NSTF

    Energy Technology Data Exchange (ETDEWEB)

    Lisowski, Darius D. [Argonne National Lab. (ANL), Argonne, IL (United States); Gerardi, Craig D. [Argonne National Lab. (ANL), Argonne, IL (United States); Kilsdonk, Dennis J. [Argonne National Lab. (ANL), Argonne, IL (United States); Bremer, Nathan C. [Argonne National Lab. (ANL), Argonne, IL (United States); Lomperski, Stephen W. [Argonne National Lab. (ANL), Argonne, IL (United States); Hu, Rui [Argonne National Lab. (ANL), Argonne, IL (United States); Kraus, Adam R. [Argonne National Lab. (ANL), Argonne, IL (United States); Bucknor, Matthew D. [Argonne National Lab. (ANL), Argonne, IL (United States); Lv, Qiuping [Argonne National Lab. (ANL), Argonne, IL (United States); Lee, Taeseung [Argonne National Lab. (ANL), Argonne, IL (United States); Farmer, Mitchell T. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-08-01

    The following report serves as a comprehensive summary of the air-based portion of the Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne National Laboratory (Argonne). Initiated in 2005 to generate validation data for the Next Generation Nuclear Plant (NGNP), the project was centered on an experimental testing program to study the behavior and bound the performance of Reactor Cavity Cooling System (RCCS) concepts. Parallel modeling and simulation efforts also have been performed to guide the design, fabrication, and operation of NSTF, as well as to assess the suitability of analysis methods for natural convection systems. The program operates under support from the Department of Energy (DOE) Office of Advanced Reactor Technologies (ART), and maintained compliance with NQA-1 2008 with 2009a in both administrative and technical portions of program activities.

  19. Fabrication, inspection, and test plan for the Advanced Test Reactor (ATR) Mixed-Oxide (MOX) fuel irradiation project

    International Nuclear Information System (INIS)

    Wachs, G.W.

    1997-11-01

    The Department of Energy (DOE) Fissile Materials Disposition Materials Disposition Program (FMDP) has announced that reactor irradiation of MOX fuel is one of the preferred alternatives for disposal of surplus weapons-usable plutonium (Pu). MOX fuel has been utilized domestically in test reactors and on an experimental basis in a number of Commercial Light Water Reactors (CLWRs). Most of this experience has been with Pu derived from spent low enriched uranium (LEU) fuel, known as reactor grade (RG) Pu. The MOX fuel test will be irradiated in the ATR to provide preliminary data to demonstrate that the unique properties of surplus weapons-derived or weapons-grade (WG) plutonium (Pu) do not compromise the applicability of this MOX experience base. In addition, the test will contribute experience with irradiation of gallium-containing fuel to the data base required for resolution of generic CLWR fuel design issues (ORNL/MD/LTR-76). This Fabrication, Inspection, and Test Plan (FITP) is a level 2 document as defined in the FMDP LWR MOX Fuel Irradiation Test Project Plan (ORNL/MD/LTR-78)

  20. Fast flux test facility, transition project plan

    International Nuclear Information System (INIS)

    Guttenberg, S.

    1994-01-01

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  1. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  2. OECD/NEA Sandia Fuel Project phase I: Benchmark of the ignition testing

    Energy Technology Data Exchange (ETDEWEB)

    Adorni, Martina, E-mail: martina_adorni@hotmail.it [UNIPI (Italy); Herranz, Luis E. [CIEMAT (Spain); Hollands, Thorsten [GRS (Germany); Ahn, Kwang-II [KAERI (Korea, Republic of); Bals, Christine [GRS (Germany); D' Auria, Francesco [UNIPI (Italy); Horvath, Gabor L. [NUBIKI (Hungary); Jaeckel, Bernd S. [PSI (Switzerland); Kim, Han-Chul; Lee, Jung-Jae [KINS (Korea, Republic of); Ogino, Masao [JNES (Japan); Techy, Zsolt [NUBIKI (Hungary); Velazquez-Lozad, Alexander; Zigh, Abdelghani [USNRC (United States); Rehacek, Radomir [OECD/NEA (France)

    2016-10-15

    Highlights: • A unique PWR spent fuel pool experimental project is analytically investigated. • Predictability of fuel clad ignition in case of a complete loss of coolant in SFPs is assessed. • Computer codes reasonably estimate peak cladding temperature and time of ignition. - Abstract: The OECD/NEA Sandia Fuel Project provided unique thermal-hydraulic experimental data associated with Spent Fuel Pool (SFP) complete drain down. The study conducted at Sandia National Laboratories (SNL) was successfully completed (July 2009 to February 2013). The accident conditions of interest for the SFP were simulated in a full scale prototypic fashion (electrically heated, prototypic assemblies in a prototypic SFP rack) so that the experimental results closely represent actual fuel assembly responses. A major impetus for this work was to facilitate severe accident code validation and to reduce modeling uncertainties within the codes. Phase I focused on axial heating and burn propagation in a single PWR 17 × 17 assembly (i.e. “hot neighbors” configuration). Phase II addressed axial and radial heating and zirconium fire propagation including effects of fuel rod ballooning in a 1 × 4 assembly configuration (i.e. single, hot center assembly and four, “cooler neighbors”). This paper summarizes the comparative analysis regarding the final destructive ignition test of the phase I of the project. The objective of the benchmark is to evaluate and compare the predictive capabilities of computer codes concerning the ignition testing of PWR fuel assemblies. Nine institutions from eight different countries were involved in the benchmark calculations. The time to ignition and the maximum temperature are adequately captured by the calculations. It is believed that the benchmark constitutes an enlargement of the validation range for the codes to the conditions tested, thus enhancing the code applicability to other fuel assembly designs and configurations. The comparison of

  3. Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Henkle, William R.; Ronne, Joel

    2008-06-15

    This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

  4. UAS Integration in the NAS Project: Flight Test 3 Data Analysis of JADEM-Autoresolver Detect and Avoid System

    Science.gov (United States)

    Gong, Chester; Wu, Minghong G.; Santiago, Confesor

    2016-01-01

    The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS Integration in the NAS, aims to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The UAS Integration in the NAS Project conducted a flight test activity, referred to as Flight Test 3 (FT3), involving several Detect-and-Avoid (DAA) research prototype systems between June 15, 2015 and August 12, 2015 at the Armstrong Flight Research Center (AFRC). This report documents the flight testing and analysis results for the NASA Ames-developed JADEM-Autoresolver DAA system, referred to as 'Autoresolver' herein. Four flight test days (June 17, 18, 22, and July 22) were dedicated to Autoresolver testing. The objectives of this test were as follows: 1. Validate CPA prediction accuracy and detect-and-avoid (DAA, formerly known as self-separation) alerting logic in realistic flight conditions. 2. Validate DAA trajectory model including maneuvers. 3. Evaluate TCAS/DAA interoperability. 4. Inform final Minimum Operating Performance Standards (MOPS). Flight test scenarios were designed to collect data to directly address the objectives 1-3. Objective 4, inform final MOPS, was a general objective applicable to the UAS in the NAS project as a whole, of which flight test is a subset. This report presents analysis results completed in support of the UAS in the NAS project FT3 data review conducted on October 20, 2015. Due to time constraints and, to a lesser extent, TCAS data collection issues, objective 3 was not evaluated in this analysis.

  5. The Rorschach: projective technique or psychometric test?

    Science.gov (United States)

    Aronow, E; Reznikoff, M; Moreland, K L

    1995-04-01

    Various approaches to the Rorschach Technique are described in terms of the idiographic-nomothetic axis and the perceptual-content axis. It is suggested that it is most productive to view the Rorschach as a projective tool, with perceptual scoring a secondary factor. Current efforts at objectification of the Rorschach are not seen as useful as efforts to enhance its projective qualities. Some possible ways are discussed in which the projective value of the instrument can be maximized.

  6. A demonstration project to test ecological restoration of a pinyon-juniper ecosystem

    Science.gov (United States)

    David W. Huffman; Michael T. Stoddard; Peter Z. Fule; W. Wallace Covington; H. B. Smith

    2008-01-01

    To test an approach for restoring historical stand densities and increasing plant species diversity of a pinyon-juniper ecosystem, we implemented a demonstration project at two sites (CR and GP) on the Grand Canyon-Parashant National Monument in northern Arizona. Historical records indicated that livestock grazing was intensive on the sites beginning in the late 1800s...

  7. Initial field testing definition of subsurface sealing and backfilling tests in unsaturated tuff; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, J.A. [Sandia National Labs., Albuquerque, NM (United States); Case, J.B.; Tyburski, J.R. [I. T. Corp., Albuquerque, NM (United States)

    1993-05-01

    This report contains an initial definition of the field tests proposed for the Yucca Mountain Project repository sealing program. The tests are intended to resolve various performance and emplacement concerns. Examples of concerns to be addressed include achieving selected hydrologic and structural requirements for seals, removing portions of the shaft liner, excavating keyways, emplacing cementitious and earthen seals, reducing the impact of fines on the hydraulic conductivity of fractures, efficient grouting of fracture zones, sealing of exploratory boreholes, and controlling the flow of water by using engineered designs. Ten discrete tests are proposed to address these and other concerns. These tests are divided into two groups: Seal component tests and performance confirmation tests. The seal component tests are thorough small-scale in situ tests, the intermediate-scale borehole seal tests, the fracture grouting tests, the surface backfill tests, and the grouted rock mass tests. The seal system tests are the seepage control tests, the backfill tests, the bulkhead test in the Calico Hills unit, the large-scale shaft seal and shaft fill tests, and the remote borehole sealing tests. The tests are proposed to be performed in six discrete areas, including welded and non-welded environments, primarily located outside the potential repository area. The final selection of sealing tests will depend on the nature of the geologic and hydrologic conditions encountered during the development of the Exploratory Studies Facility and detailed numerical analyses. Tests are likely to be performed both before and after License Application.

  8. {open_quotes}O{close_quotes} ring sealed process tube, Phase II, test project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.E.

    1951-04-09

    The {open_quotes}O{close_quotes} ring seal has been proposed to replace the van stone flange and the bellows thermal expansion assembly currently used on the existing Hanford piles to achieve water and gas seals, respectively. Possible advantages of the {open_quotes}O{close_quotes} ring seal are: (1) simplification of component parts and elimination of van stone corrosion; (2) simplification of maintenance; (3) lower costs of initial erection; (4) increased strength. This test supplements Test Project No. 27 (a preliminary thermal cycling test) in applying the {open_quotes}O{close_quotes} ring seal assembly to actual pile operating conditions.

  9. Operational test report - Project W-320 cathodic protection systems

    International Nuclear Information System (INIS)

    Bowman, T.J.

    1998-01-01

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems

  10. Goodness-of-Fit Tests For Elliptical and Independent Copulas through Projection Pursuit

    Directory of Open Access Journals (Sweden)

    Jacques Touboul

    2011-04-01

    Full Text Available Two goodness-of-fit tests for copulas are being investigated. The first one deals with the case of elliptical copulas and the second one deals with independent copulas. These tests result from the expansion of the projection pursuit methodology that we will introduce in the present article. This method enables us to determine on which axis system these copulas lie as well as the exact value of these very copulas in the basis formed by the axes previously determined irrespective of their value in their canonical basis. Simulations are also presented as well as an application to real datasets.

  11. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  12. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    International Nuclear Information System (INIS)

    Myers, N.K.

    1997-01-01

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  13. The US National Resources Defense Council/Soviet Academy of Sciences Nuclear Test Ban Verification Project

    International Nuclear Information System (INIS)

    Cochran, T.B.

    1989-01-01

    The first week in September 1987 was an extraordinary one for arms control verification. As part of the co-operative Test Ban Verification Project of the Natural Resources Defense Council (NRDC) and the Soviet Academy of Sciences, fourteen American scientists from the Scripps Institution of Oceanography (at the University of California- San Diego), University of Nevada-Reno and the University of Colorado went to the region of the Soviet's principal nuclear test site near Semipalatinsk. Together with their Soviet counterparts from the Institute of Physics of the Earth (IPE) in Moscow, they fired off three large chemical explosions. The purpose of these explosions was to demonstrate the sensitivity of the three seismic stations surrounding the test site, to study the efficiency with which high-frequency seismic waves propagate in the region, and to study differences between chemical explosions, nuclear explosions and earthquakes in order more firmly to establish procedures for verification of a nuclear test ban. This paper presents a review of the results of these experiments, an update on the status of the joint project, and a review of the significance of high frequency seismic data to test ban verification

  14. Manufacturing of cells and stacks for SOFC development, test and demonstration projects and SOFC hotbox design development

    Energy Technology Data Exchange (ETDEWEB)

    2008-09-15

    The purpose of this project is to support the continued SOFC development through manufacturing process optimization and manufacturing of SOFC cells and stacks. These cells and stacks will serve as a necessary base for the development activities and for the establishment of a number of test and demonstration activities. The manufacture will also help provide operating experience and reduce manufacturing cost. Another main focus of the manufacturing is to assure technical improvements and reliability. It is imperative to the eventual success of the technology that test and demonstration is carried out in the pre-market conditions that will exist for the next years in the three market segments targeted by TOFC (Distributed generation, micro CHP and APU incl. marine APU). Finally, the project also includes development activities focusing on the stack-system interface (hotbox design development) and on dealing with transients and start up and shut down times, which is of particular importance for APU and micro CHP applications. Three topics are addressed:1) Cell manufacture, including production development, capacity lift and manuf. of cells for test and demonstration; 2) Stack manufacture and test, including a test facility, stack manuf. and test of stacks in a system at HCV; 3) Hotbox design development, including design, prototype construction and testing. The progress of this project is documented. Major achievements are successful manufacture of adequate amounts of cells and stacks according to the application. Furthermore significant over-performance in design, construction and test of a methanol based hotbox prototype as well as publication of this. (au)

  15. Power ramp performance of some 15 x 15 PWR test fuel rods tested in the STUDSVIK SUPER-RAMP and SUPER-RAMP extension projects

    International Nuclear Information System (INIS)

    Djurle, S.

    2000-01-01

    This paper presents results obtained from the STUDSVIK SUPER-RAMP (SR) and SUPER-RAMP EXTENSION (SRX) projects. As parts of these projects test fuel rods of the same PWR type were base irradiated in the Obrigheim power reactor and power ramp tested in the STUDSVIK R2 reactor. Some of the rods were ramped using an inlet coolant water temperature 50 deg. C below the normal one. Fabricated data on the test fuel rods are presented as well as data on the base irradiation, interim examination, conditioning irradiation, power ramp irradiation and results of the post irradiation examination. The data on the change of diameter at ridges due to power ramping have shown that a lower clad temperature during ramping leads to smaller deformations. Most likely this may be explained as due to a smaller creep rate in the cladding at the lower temperature, resulting in a more severe stress situation. The combination of low cladding temperature, high ramp terminal level and the presence of a stress corrosion agent may have caused the failure of one of the test rods. (author)

  16. Endoscopic Follow-Up of Positive Fecal Occult Blood Testing in the Ontario FOBT Project

    Directory of Open Access Journals (Sweden)

    Lawrence Paszat

    2007-01-01

    Full Text Available BACKGROUND: The Ontario FOBT Project is a pilot study of fecal occult blood testing (FOBT for colorectal cancer screening conducted among age-eligible volunteers (50 to 75 years in 12 of 37 public health regions in Ontario.

  17. Action Memorandum for Decommissioning the Engineering Test Reactor Complex under the Idaho Cleanup Project

    International Nuclear Information System (INIS)

    A. B. Culp

    2007-01-01

    This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared and released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessel. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface

  18. Identification of suicidal ideations with the help of projective tests: a review.

    Science.gov (United States)

    Kumar, Devvarta; Nizamie, S Haque; Abhishek, Priyadarshee; Prasanna, Lavanya Tumkur

    2014-12-01

    Identification of the presence of suicidal ideations in an individual is crucial for the timely intervention. However, these ideations may remain unidentified as an individual with serious intentions of self-harm may not express them explicitly. Various projective tests can provide crucial clues to clinicians about the presence of suicidal ideations in an individual's mind. The present review is intended to update clinicians working in the field of suicide prevention about salient findings on these tests which can serve as a ready reckoner for them. We also highlight the status of research in this domain. Copyright © 2014 Elsevier B.V. All rights reserved.

  19. Database requirements for the Advanced Test Accelerator project

    International Nuclear Information System (INIS)

    Chambers, F.W.

    1984-01-01

    The database requirements for the Advanced Test Accelerator (ATA) project are outlined. ATA is a state-of-the-art electron accelerator capable of producing energetic (50 million electron volt), high current (10,000 ampere), short pulse (70 billionths of a second) beams of electrons for a wide variety of applications. Databasing is required for two applications. First, the description of the configuration of facility itself requires an extended database. Second, experimental data gathered from the facility must be organized and managed to insure its full utilization. The two applications are intimately related since the acquisition and analysis of experimental data requires knowledge of the system configuration. This report reviews the needs of the ATA program and current implementation, intentions, and desires. These database applications have several unique aspects which are of interest and will be highlighted. The features desired in an ultimate database system are outlined. 3 references, 5 figures

  20. Dredging Research, Volume 3, No. 3. DNA Technology to Impact Dredged Material Projects through Faster, More Accurate Testing Methods

    National Research Council Canada - National Science Library

    McDonald, Allison

    2000-01-01

    .... Most people associate DNA with criminal cases and paternity testing, but thanks to research projects such as the Human Genome Project, which has isolated and identified thousands of genes, many...

  1. Results of eddy current test for second round robin by Halden reactor project

    International Nuclear Information System (INIS)

    Iwai, Takashi; Souzawa, Shizuo; Miyata, Seiichi; Sakai, Haruyuki; Sakakura, Atsushi

    1986-08-01

    JMTR Hot Laboratory has executed the eddy current test of two PWR type zircaloy cladding tubes for the second round robin by Halden Reactor Project. Defects manufactured on the test specimen were revealed on a fair way to success as a function of local position, phase character and size. Influence of the fatigue crack between the two different tubes was studied through the phase angle analysis. More effort should be needed for detecting rather smaller internal defect when it was combined with external and other various type of defects. (author)

  2. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    International Nuclear Information System (INIS)

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE)

  3. Advanced Manufacturing Technologies (AMT): Additive Manufactured Hot Fire Planning and Testing in GRC Cell 32 Project

    Science.gov (United States)

    Fikes, John C.

    2014-01-01

    The objective of this project is to hot fire test an additively manufactured thrust chamber assembly TCA (injector and thrust chamber). GRC will install the additively manufactured Inconel 625 injector, two additively manufactured (SLM) water cooled Cu-Cr thrust chamber barrels and one additively manufactured (SLM) water cooled Cu-Cr thrust chamber nozzle on the test stand in Cell 32 and perform hot fire testing of the integrated TCA.

  4. Relationship of creative projects in anatomy to medical student professionalism, test performance and stress: an exploratory study.

    Science.gov (United States)

    Shapiro, Johanna; Nguyen, Vincent P; Mourra, Sarah; Boker, John R; Ross, Marianne; Thai, Trung M; Leonard, Robert J

    2009-11-03

    The anatomy course offers important opportunities to develop professionalism at an early stage in medical education. It is an academically significant course that also engenders stress in some students. Over a three-year period, 115 of 297 students completed creative projects. Thirty-four project completers and 47 non-completers consented to participate in the study. Projects were analyzed for professionalism themes using grounded theory. A subset of project completers and non-completers were interviewed to determine their views about the stress of anatomy and medical school, as well as the value of the creative projects. We also compared test performance of project completers and non-completers. Projects completed early in the course often expressed ambivalence about anatomy, whereas later projects showed more gratitude and sense of awe. Project completers tended to report greater stress than noncompleters, but stated that doing projects reduced stress and caused them to develop a richer appreciation for anatomy and medicine. Project completers performed significantly lower than non-completers on the first written exam (pre-project). Differences between groups on individual exams after both the first and second creative project were nonsignificant. For some students, creative projects may offer a useful way of reflecting on various aspects of professionalism while helping them to manage stress.

  5. Computer system requirements specification for 101-SY hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    McNeece, S.G.; Truitt, R.W.

    1994-01-01

    The system requirements specification for SY-101 hydrogen mitigation test project (HMTP) data acquisition and control system (DACS-1) documents the system requirements for the DACS-1 project. The purpose of the DACS is to provide data acquisition and control capabilities for the hydrogen mitigation testing of Tank SY-101. Mitigation testing uses a pump immersed in the waste, directed at varying angles and operated at different speeds and time durations. Tank and supporting instrumentation is brought into the DACS to monitor the status of the tank and to provide information on the effectiveness of the mitigation test. Instrumentation is also provided for closed loop control of the pump operation. DACS is also capable for being expanded to control and monitor other mitigation testing. The intended audience for the computer system requirements specification includes the SY-101 hydrogen mitigation test data acquisition and control system designers: analysts, programmers, instrument engineers, operators, maintainers. It is intended for the data users: tank farm operations, mitigation test engineers, the Test Review Group (TRG), data management support staff, data analysis, Hanford data stewards, and external reviewers

  6. Testing a Novel Geopolymer Binder as a Refractory Material for Rocket Plume Environments at SSC Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The project involved the development and testing of a new alumina-silicate based multi-purpose, cost-effective, ‘green’ cementitious binder (geopolymer)...

  7. Apollo Soyuz Test Project Weights and Mass Properties Operational Management System

    Science.gov (United States)

    Collins, M. A., Jr.; Hischke, E. R.

    1975-01-01

    The Apollo Soyuz Test Project (ASTP) Weights and Mass Properties Operational Management System was established to assure a timely and authoritative method of acquiring, controlling, generating, and disseminating an official set of vehicle weights and mass properties data. This paper provides an overview of the system and its interaction with the various aspects of vehicle and component design, mission planning, hardware and software simulations and verification, and real-time mission support activities. The effect of vehicle configuration, design maturity, and consumables updates is discussed in the context of weight control.

  8. Hot Corrosion Test Facility at the NASA Lewis Special Projects Laboratory

    Science.gov (United States)

    Robinson, Raymond C.; Cuy, Michael D.

    1994-01-01

    The Hot Corrosion Test Facility (HCTF) at the NASA Lewis Special Projects Laboratory (SPL) is a high-velocity, pressurized burner rig currently used to evaluate the environmental durability of advanced ceramic materials such as SiC and Si3N4. The HCTF uses laboratory service air which is preheated, mixed with jet fuel, and ignited to simulate the conditions of a gas turbine engine. Air, fuel, and water systems are computer-controlled to maintain test conditions which include maximum air flows of 250 kg/hr (550 lbm/hr), pressures of 100-600 kPa (1-6 atm), and gas temperatures exceeding 1500 C (2732 F). The HCTF provides a relatively inexpensive, yet sophisticated means for researchers to study the high-temperature oxidation of advanced materials, and the injection of a salt solution provides the added capability of conducting hot corrosion studies.

  9. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and

  10. Medium Voltage Microgrid Test Setup and Procedures Implemented on a Real Pilot Project

    Directory of Open Access Journals (Sweden)

    Bruno Alberto Pacheco

    2018-01-01

    Full Text Available This paper presents various concepts related to the application of a microgrid pilot project in a residential condominium at Fortaleza / CE – Brazil, such as battery energy system, renewable and distributed generation, islanding recloser and all different units using interface based on power electronics. This papers main objective is to create information about microgrid operation and the interaction between its main equipment, such as power converters, utility energy distribution system and control units responsible for algorithms and changes in microgrids operation mode. This information is important for understanding the need for a test setup construction. To perform the test procedures, a temporary setup in a controlled environment within the microgrid is proposed. During the test periods, intentional power outages are required to evaluate the operating mode switching on each unit. The test setup described in this paper aims to mitigate the tests effects on other residential units inside the condominium.

  11. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  12. Report on survey for high-performance industrial furnace introduction field test project in fiscal 1999. Activities to promote proliferation of the introduction to subject project related business entities; 1999 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. Taisho jigyosha eno fukyu sokushin katsudo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper reports the survey on high-performance industrial furnace introduction field test project in fiscal 1999. The development of a high-performance industrial furnace having been performed by NEDO since fiscal 1993 has completed the fundamental development research in fiscal 1998, and the planned achievements were verified (large energy saving, reduction of NOx emission, and down-sizing). Upon the result, the introduction field test project has started in fiscal 1998 for three years until fiscal 2000. The number of research items adopted in fiscal 1998 was 58, and those in fiscal 1999 was 51, which are progressing smoothly at the present. Reduction in CO2 emission of 50,000 tons was demonstrated as the achievement in fiscal 1998, and NOx emission realized the regulation value or lower in cities wherein each operator is executing the project. Several cases of down-sizing were also reported. In the proliferation promoting project in fiscal 1998, activities were made mainly to the subject project related business entities in relation with the development achievements and general technologies for the high-performance furnace. In fiscal 1999, communication transmission was continued by using information tools on introduction of the achievements and technologies. Attempts will be made on promoting the proliferation of the field test project in the future through a number of technology lecture meetings performed by specialists. (NEDO)

  13. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  14. Analyses of CsI aerosol deposition tests in WIND project with ART and VICTORIA codes

    International Nuclear Information System (INIS)

    Yuchi, Y.; Shibazaki, H.; Kudo, T.

    2000-01-01

    Deposition behavior of cesium iodide (CsI) was analyzed with ART and VICTORIA-92 codes for a test of the aerosol re-vaporization test series performed in WIND project at JAERI. In the test analyzed, CsI aerosol was injected into piping of test section where metaboric acid (HBO 2 ) was placed in advance on the floor area. It was confirmed in the present analysis that similar results on the CsI deposition were obtained between ART and VICTORIA when influences of chemical interactions were negligibly small. The analysis with VICTORIA agreed satisfactorily with the test results in analytical cases that cesium metaborate (CsBO 2 ) was injected into the test section instead of CsI to simulate the pre-existence of HBO 2 effect. (author)

  15. A case study of metric-based and scenario-driven black box testing for SAP projects

    NARCIS (Netherlands)

    Daneva, Maia; Abran, Alain; Ormandjieva, Olga; Abu Talib, Manar; Abran, Alain; Bundschuh, Manfred; Buren, Gunter; Dumke, Reiner R.

    2006-01-01

    Enterprise Resource Planning (ERP) projects are perceived as mission-critical initiatives in many organizations. They are parts of business transformation programs and are instrumental in improving organizational performance. In ERP implementations, testing is an activity that is crucial in order to

  16. Relationship of creative projects in anatomy to medical student professionalism, test performance and stress: an exploratory study

    Directory of Open Access Journals (Sweden)

    Thai Trung M

    2009-11-01

    Full Text Available Abstract Background The anatomy course offers important opportunities to develop professionalism at an early stage in medical education. It is an academically significant course that also engenders stress in some students. Methods Over a three-year period, 115 of 297 students completed creative projects. Thirty-four project completers and 47 non-completers consented to participate in the study. Projects were analyzed for professionalism themes using grounded theory. A subset of project completers and non-completers were interviewed to determine their views about the stress of anatomy and medical school, as well as the value of the creative projects. We also compared test performance of project completers and non-completers. Results Projects completed early in the course often expressed ambivalence about anatomy, whereas later projects showed more gratitude and sense of awe. Project completers tended to report greater stress than noncompleters, but stated that doing projects reduced stress and caused them to develop a richer appreciation for anatomy and medicine. Project completers performed significantly lower than non-completers on the first written exam (pre-project. Differences between groups on individual exams after both the first and second creative project were nonsignificant. Conclusion For some students, creative projects may offer a useful way of reflecting on various aspects of professionalism while helping them to manage stress.

  17. Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment. Research project

    International Nuclear Information System (INIS)

    Martorell, S.; Serradell, V.; Munoz, A.; Sanchez, A.

    1997-01-01

    Background, objective, scope, detailed working plan and follow-up and final product of the project ''Global optimization of maintenance and surveillance testing based on reliability and probabilistic safety assessment'' are described

  18. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  19. Mont Terri Project - Heater experiment, engineered barriers emplacement and ventilations tests. No 1 - Swiss Geological Survey, Bern, 2007

    International Nuclear Information System (INIS)

    Bossart, P.; Nussbaum, C.

    2007-01-01

    The international Mont Terri project started in January 1996. Research is carried out in the Mont Terri rock laboratory, an underground facility near the security gallery of the Mont Terri motorway tunnel (vicinity of St-Ursanne, Canton of Jura, Switzerland). The aim of the project is the geological, hydrogeological, geochemical and geotechnical characterisation of a clay formation, specifically of the Opalinus Clay. Twelve Partners from European countries and Japan participate in the project. These are ANDRA, BGR, CRIEPI, ENRESA, GRS, HSK, IRSN, JAEA, NAGRA, OBAYASHI, SCK.CEN and swisstopo. Since 2006, swisstopo acts as operator of the rock laboratory and is responsible for the implementation of the research programme decided by the partners. The three following reports are milestones in the research history of the Mont Terri project. It was the first time that an in-situ heating test with about 20 observation boreholes over a time span of several years was carried out in a clay formation. The engineered barrier emplacement experiment has been extended due to very encouraging measurement results and is still going on. The ventilation test was and is a challenge, especially in the very narrow microtunnel. All three projects were financially supported by the European Commission and the Swiss State Secretariat for Education and Research. The three important scientific and technical reports, which are presented in the following, have been provided by a number of scientists, engineers and technicians from the Partners, but also from national research organisations and private contractors. Many fruitful meetings where held, at the rock laboratory and at other facilities, not to forget the weeks and months of installation and testing work carried out by the technicians and engineers. The corresponding names and organisations are listed in detail in the reports. Special thanks are going to the co-ordinators of the three projects for their motivation of the team during

  20. Statistical Analysis of the Polarimetric Cloud Analysis and Seeding Test (POLCAST) Field Projects

    Science.gov (United States)

    Ekness, Jamie Lynn

    The North Dakota farming industry brings in more than $4.1 billion annually in cash receipts. Unfortunately, agriculture sales vary significantly from year to year, which is due in large part to weather events such as hail storms and droughts. One method to mitigate drought is to use hygroscopic seeding to increase the precipitation efficiency of clouds. The North Dakota Atmospheric Research Board (NDARB) sponsored the Polarimetric Cloud Analysis and Seeding Test (POLCAST) research project to determine the effectiveness of hygroscopic seeding in North Dakota. The POLCAST field projects obtained airborne and radar observations, while conducting randomized cloud seeding. The Thunderstorm Identification Tracking and Nowcasting (TITAN) program is used to analyze radar data (33 usable cases) in determining differences in the duration of the storm, rain rate and total rain amount between seeded and non-seeded clouds. The single ratio of seeded to non-seeded cases is 1.56 (0.28 mm/0.18 mm) or 56% increase for the average hourly rainfall during the first 60 minutes after target selection. A seeding effect is indicated with the lifetime of the storms increasing by 41 % between seeded and non-seeded clouds for the first 60 minutes past seeding decision. A double ratio statistic, a comparison of radar derived rain amount of the last 40 minutes of a case (seed/non-seed), compared to the first 20 minutes (seed/non-seed), is used to account for the natural variability of the cloud system and gives a double ratio of 1.85. The Mann-Whitney test on the double ratio of seeded to non-seeded cases (33 cases) gives a significance (p-value) of 0.063. Bootstrapping analysis of the POLCAST set indicates that 50 cases would provide statistically significant results based on the Mann-Whitney test of the double ratio. All the statistical analysis conducted on the POLCAST data set show that hygroscopic seeding in North Dakota does increase precipitation. While an additional POLCAST field

  1. Specifications, tests, and installation of wires and cables for the Diablo Canyon Nuclear Power Project

    International Nuclear Information System (INIS)

    Dan, F.J.

    1977-01-01

    The process of selecting wires and cables for the Diablo Canyon Nuclear Power Project is described. The criteria for the fire and environmental tests, the basis for the specifications, and the reasons for the final choice and acceptance are outlined. A short section is dedicated to the installation of cables in raceways with reference to separation and color coding. Also covered are the selection and testing of fire stops and the selection of seismic supports

  2. Tokamak Fusion Test Reactor Project

    International Nuclear Information System (INIS)

    1983-01-01

    Where the project's major contracts for buildings and equipment have experienced significant increases in cost, even though the contracts were for fixed prices, IG concluded that a major reason for the increases was the failure to adequately specify requirements prior to awarding the contracts. IG recommended that the Department should develop guidelines on what constitutes an adequate specification for a fixed-price contract and what controls should be placed over change orders. The Assistant Secretary for Management and Administration indicated in his comments to the draft report that an upcoming revision of the Accounting Practices and Procedures Handbook would establish controls over reallocations of construction funds to operating funds. Recommendations also propose that particular attention be given to ensuring that an agreed-upon plan and budget for completing the project is established, that a performance measurement system be implemented by the Princeton Plasma Physics Laboratory, and that improvements be made in the laboratory's Cost/Schedule Performance Report. Improvements are also needed in the quality assurance and safety programs of the Princeton Plasma Physics Laboratory. A number of recommendations from previous quality-assurance and safety reviews, performed by personnel from the Princeton Plasma Physics Laboratory and the Department of Energy, have not been implemented. Comments to the draft report also address these outstanding issues

  3. High power tests of the prototype 352 MHz beta 0.85 five cell cavity for the TRASCO project

    International Nuclear Information System (INIS)

    Chiaveri, E.; Losito, R.; Calatroni, S.

    2003-01-01

    The Five-cell beta 0.85 cavities built at CERN for the development of the TRASCO project is fully tested at the CERN SL-CT Test Bench. The cavity, built using the standard Niobium on Copper technique, was previously tested in a vertical cryostat, showing Qo and Field exceeding the design goal for the TRASCO Project (2.5x10 9 and 5.5 MV/m at 4.5 K). After the successful test we decided to check the performances of the cavity installed in a horizontal Cryostat and equipped with a LEP-II Type high power main coupler and HOM couplers. The cavity was equipped with the Helium Tank, Tuners and couplers at CERN and tested at the SL-CT facility at CERN under a collaboration agreement between INFN and CERN. The behavior of the fully equipped cavity substantially confirmed the results of the preliminary production tests in the vertical Cryostat. The quality factor at low field was substantially unchanged. No MP activity was detected confirming the soundness of the design and the quality of the surface treatment. (author)

  4. Recovery efficiency test project, Phase 2 activity report

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1989-02-01

    The Recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency of gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. This volume contains appendices for: (1) supporting material and procedures for data frac'' stimulation of zone 6 using nitrogen and nitrogen foam; (2) supporting material and procedures for stimulation no. 1 nitrogen gas frac on zone no. 1; (3) supporting material and procedures for stimulation no. 2 in zone no. 1 using liquid CO{sub 2}; (4) supporting material and procedures for frac no. 3 on zone no.1 using nitrogen foam and proppant; (5) supporting material and procedures for stimulation no. 4 in zones 2--3 and 4 using nitrogen foam and proppant; (6) supporting materials and procedures for stimulation no. 5 in zones 5 and 8; and (7) fracture diagnostics reports and supporting materials.

  5. Neighborhood electric vehicle market test development project: Sacramento electric transportation consortium Ra 93-23 program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Warf, W.R.

    1997-02-01

    The neighborhood electric vehicle (NEV) niche is the object of this market and product test project. The project availed itself of a limited production three wheel, single passenger low performance NEV designed and produced in Denmark to determine the acceptability of the design for production and use in North America. This vehicle, as well as a prototype four wheel vehicle designed and constructed through this project, are entirely reinforced plastic chassis and body. Pacific Electric Vehicles was the primary participant in the Project. Included are the evaluation of drive system components, battery charging schemes, body and chassis and glazing material suitability. The project determined and/or verified many of the realities of motor vehicle development and usage in the U.S., which remain more restrictive than elsewhere. Statistical usage data, maintenance requirements, and user experiences are reported and analyzed.

  6. Analyses of CsI aerosol deposition in aerosol behavior tests in WIND project

    International Nuclear Information System (INIS)

    Kudo, Tamotsu; Shibazaki, Hiroaki; Hidaka, Akihide

    1999-01-01

    The aerosol deposition tests have been performed in WIND project at JAERI to characterize the aerosol behavior. The aerosol deposition tests named WAV1-D and WAV2-D were analyzed by aerosol behavior analysis codes, JAERI's ART and SNL's VICTORIA. The comparison calculation was performed for the confirmation of the analytical capabilities of the both codes and improvement of the models in ART. The deposition mass calculated by ART was larger than that by VICTORIA. This discrepancy is caused by differences in model for FP vapor condensation onto the wall surface. In the WAV2-D test, in which boric acid was placed on the floor area of the test section prior to the deposition phase to simulate the PWR primary coolant, there was a discrepancy in deposition mass between analytical results in both codes and experimental results. The discrepancy may be caused by existence of boric acid which is not considered in the codes. (author)

  7. Fabrication, characterization and testing of silicon photomultipliers for the Muon Portal Project

    International Nuclear Information System (INIS)

    La Rocca, P.; Billotta, S.; Blancato, A.A.; Bonanno, D.; Bonanno, G.; Fallica, G.; Garozzo, S.; Lo Presti, D.; Marano, D.; Pugliatti, C.; Riggi, F.; Romeo, G.; Santagati, G.; Valvo, G.

    2015-01-01

    The Muon Portal is a recently started Project aiming at the construction of a large area tracking detector that exploits the muon tomography technique to inspect the contents of traveling cargo containers. The detection planes will be made of plastic scintillator strips with embedded wavelength-shifting fibres. Special designed silicon photomultipliers will read the scintillation light transported by the fibres along the strips and a dedicated electronics will combine signals from different strips to reduce the overall number of channels, without loss of information. Different silicon photomultiplier prototypes, both with the p-on-n and n-on-p technologies, have been produced by STMicroelectronics during the last years. In this paper we present the main characteristics of the silicon photomultipliers designed for the Muon Portal Project and describe the setup and the procedure implemented for the characterization of these devices, giving some statistical results obtained from the test of a first batch of silicon photomultipliers

  8. Fabrication, characterization and testing of silicon photomultipliers for the Muon Portal Project

    Energy Technology Data Exchange (ETDEWEB)

    La Rocca, P., E-mail: paola.larocca@ct.infn.it [Dipartimento di Fisica e Astronomia - Catania (Italy); INFN - Sezione di Catania (Italy); Billotta, S. [INAF - Osservatorio Astrofisico di Catania (Italy); Blancato, A.A.; Bonanno, D. [Dipartimento di Fisica e Astronomia - Catania (Italy); Bonanno, G. [INAF - Osservatorio Astrofisico di Catania (Italy); Fallica, G. [STMicroelectronics - Catania (Italy); Garozzo, S. [INAF - Osservatorio Astrofisico di Catania (Italy); Lo Presti, D. [Dipartimento di Fisica e Astronomia - Catania (Italy); INFN - Sezione di Catania (Italy); Marano, D. [INAF - Osservatorio Astrofisico di Catania (Italy); Pugliatti, C.; Riggi, F. [Dipartimento di Fisica e Astronomia - Catania (Italy); INFN - Sezione di Catania (Italy); Romeo, G. [INAF - Osservatorio Astrofisico di Catania (Italy); Santagati, G. [Dipartimento di Fisica e Astronomia - Catania (Italy); INFN - Sezione di Catania (Italy); Valvo, G. [STMicroelectronics - Catania (Italy)

    2015-07-01

    The Muon Portal is a recently started Project aiming at the construction of a large area tracking detector that exploits the muon tomography technique to inspect the contents of traveling cargo containers. The detection planes will be made of plastic scintillator strips with embedded wavelength-shifting fibres. Special designed silicon photomultipliers will read the scintillation light transported by the fibres along the strips and a dedicated electronics will combine signals from different strips to reduce the overall number of channels, without loss of information. Different silicon photomultiplier prototypes, both with the p-on-n and n-on-p technologies, have been produced by STMicroelectronics during the last years. In this paper we present the main characteristics of the silicon photomultipliers designed for the Muon Portal Project and describe the setup and the procedure implemented for the characterization of these devices, giving some statistical results obtained from the test of a first batch of silicon photomultipliers.

  9. A Test of the Validity of Projective and Quasi-Projective Measures of Interpersonal Distance.

    Science.gov (United States)

    Jones, Stanley E.; Aiello, John R.

    1979-01-01

    Discusses research supporting the conclusion that projective and quasi-projective measures of interpersonal distance do not measure the same phenomena as interactional measures. It is possible that they are more indicative of psychological rather than physical distance. (JMF)

  10. RESEARCH ON NON-DESTRUCTIVE TESTING TECHNOLOGY IN CONSERVATION REPAIR PROJECT OF ANCESTRAL TEMPLE IN MUKDEN PALACE

    Directory of Open Access Journals (Sweden)

    J. Yang

    2017-08-01

    Full Text Available Due to the use of wood and other non-permanent materials, traditional Chinese architecture is one of the most fragile constructions in various heritage objects today. With the increasing emphasis on the protection of cultural relics, the repair project of wooden structure has become more and more important. There are various kinds of destructions, which pose a hidden danger to the overall safety of the ancient buildings, caused not only by time and nature, but also by improper repairs in history or nowadays. Today, the use of digital technology is a basic requirement in the conservation of cultural heritage. Detection technology, especially non-destructive testing technology, could provide more accurate records in capturing detailed physical characteristics of structures such as geometric deformation and invisible damage, as well as prevent a man-made destruction in the process of repair project. This paper aims to interpret with a typical example, Ancestral Temple in Mukden Palace, along with a discussion of how to use the non-destructive testing technology with ground penetrating radar, stress wave, resistograph and so on, in addition to find an appropriate protection method in repair project of traditional Chinese wooden architecture.

  11. Research on Non-Destructive Testing Technology in Conservation Repair Project of Ancestral Temple in Mukden Palace

    Science.gov (United States)

    Yang, J.; Fu, M.

    2017-08-01

    Due to the use of wood and other non-permanent materials, traditional Chinese architecture is one of the most fragile constructions in various heritage objects today. With the increasing emphasis on the protection of cultural relics, the repair project of wooden structure has become more and more important. There are various kinds of destructions, which pose a hidden danger to the overall safety of the ancient buildings, caused not only by time and nature, but also by improper repairs in history or nowadays. Today, the use of digital technology is a basic requirement in the conservation of cultural heritage. Detection technology, especially non-destructive testing technology, could provide more accurate records in capturing detailed physical characteristics of structures such as geometric deformation and invisible damage, as well as prevent a man-made destruction in the process of repair project. This paper aims to interpret with a typical example, Ancestral Temple in Mukden Palace, along with a discussion of how to use the non-destructive testing technology with ground penetrating radar, stress wave, resistograph and so on, in addition to find an appropriate protection method in repair project of traditional Chinese wooden architecture.

  12. The CGEM-IT of the BESIII experiment: project update and test results in magnetic field

    Science.gov (United States)

    Mezzadri, G.

    2016-08-01

    The BESIII experiment is a multi-purpose detector operating on the electron- positron collider BEPCII in Beijing. Since 2008, the world's largest sample of J/ψ, ψ’ were collected. Due to increasing luminosity, the inner drift chamber is showing signs of aging. In 2014, an upgrade was proposed by the Italian collaboration based on the Cylindrical Gas Electron Multipliers (CGEM) technology, developed within the KLOE-II experiment, but with several new features and innovations. In this contribution, an overview of the project will be presented. Preliminary results of a beam test will be shown, with particular focus on the detector performance in magnetic field, with different configurations of electric field. A new readout mode, the µTPC readout, will also be described. The project has been recognized as a Significant Research Project within the Executive Programme for Scientific and Technological Cooperation between Italy and P.R.C for the years 2013-2015, and more recently has been selected as one of the project funded by the European Commission within the call H2020- MSCA-RISE-2014.

  13. Three dimensional numeric quench simulation of Super-FRS dipole test coil for FAIR project

    International Nuclear Information System (INIS)

    Wu Wei; Ma Lizhen; He Yuan; Yuan Ping

    2013-01-01

    The prototype of superferric dipoles for Super-FRS of Facility for Antiprotons and Ion Research (FAIR) project was designed, fabricated, and tested in China. To investigate the performance of the superconducting coil, a so-called test coil was fabricated and tested in advance. A 3D model based on ANSYS and OPERA 3D was developed in parallel, not only to check if the design matches the numerical simulation, but also to study more details of quench phenomena. The model simplifies the epoxy impregnated coil into an anisotropic continuum medium. The simulation combines ANSYS solver routines for nonlinear transient thermal analysis, the OPERA 3D for magnetic field evaluation and the ANSYS script language for calculations of Joule heat and differential equations of the protection circuits. The time changes of temperature, voltage and current decay, and quench propagation during quench process were analyzed and illustrated. Finally, the test results of the test coil were demonstrated and compared with the results of simulation. (authors)

  14. Transferability of Data Related to the Underground Test Area Project, Nevada Test Site, Nye County, Nevada: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Stoller-Navarro Joint Venture

    2004-06-24

    This document is the collaborative effort of the members of an ad hoc subcommittee of the Underground Test Area (UGTA) Technical Working Group (TWG). The UGTA Project relies on data from a variety of sources; therefore, a process is needed to identify relevant factors for determining whether material-property data collected from other areas can be used to support groundwater flow, radionuclide transport, and other models within a Corrective Action Unit (CAU), and for documenting the data transfer decision and process. This document describes the overall data transfer process. Separate Parameter Descriptions will be prepared that provide information for selected specific parameters as determined by the U.S. Department of Energy (DOE) UGTA Project Manager. This document and its accompanying appendices do not provide the specific criteria to be used for transfer of data for specific uses. Rather, the criteria will be established by separate parameter-specific and model-specific Data Transfer Protocols. The CAU Data Documentation Packages and data analysis reports will apply the protocols and provide or reference a document with the data transfer evaluations and decisions.

  15. Low-gravity homogenization and solidification of aluminum antimonide. [Apollo-Soyuz test project

    Science.gov (United States)

    Ang, C.-Y.; Lacy, L. L.

    1976-01-01

    The III-V semiconducting compound AlSb shows promise as a highly efficient solar cell material, but it has not been commercially exploited because of difficulties in compound synthesis. Liquid state homogenization and solidification of AlSb were carried out in the Apollo-Soyuz Test Project Experiment MA-044 in the hope that compositional homogeneity would be improved by negating the large density difference between the two constituents. Post-flight analysis and comparative characterization of the space-processed and ground-processed samples indicate that there are major homogeneity improvements in the low-gravity solidified material.

  16. Preliminary draft: environmental impact statement for Hot Engineering Test Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Boyle, J.W.; Baxter, B.J.; Carpenter, J.A.

    1978-08-01

    The project considered is the Hot Engineering Test Project (HETP), which is to be located in largely existing facilities at Oak Ridge National Laboratory (ORNL). The project is a part of the National High Temperature Gas-Cooled Reactor Fuel Recycle Program, which seeks to demonstrate the technological feasibility of the recycle processes. The HETP will attempt to confirm the operability of the processes (proven feasible in cold or nonradioactive, benchtop experimentation) under the more realistic radioactive condition. As such, the operation will involve the reprocessing and refabrication of spent HTGR fuel rods obtained from the Fort St. Vrain reactor. The reference fuel is highly enriched uranium. No significant radiological impacts are expected from routine operation of the facility to any biota or ecosystem. Concentrations of one or more radionuclides in Whiteoak Lake will increase as a result of the combination of HETP wastes with other ORNL wastes. Nonradiological effects from construction activities and routine operation should be insignificant on land and water use and on terrestrial and aquatic ecosystems. No significant socioeconomic impacts should occur from either construction or operation of the facility. Some conservative accident scenarios depict significant releases of radioactivity. Effects should be localized and would not be severe for all but the most unlikely of such incidents. No significant long-term commitment of resources is expected to be required for the project. Nor are any large quantities of scarce or critical resources likely to be irreversibly or irretrievably committed to the project. Principal alternatives considered were: relocation of the project site, postponement of the project schedule, project cancellation, and chemical process variations

  17. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  18. Project GRETE: evaluation of non destructive testing techniques for monitoring of material degradation

    International Nuclear Information System (INIS)

    Coste, J.F.

    2001-01-01

    The material aging of major critical components of nuclear installations due to in-service conditions may lead to a degradation of their mechanical characteristics. The early detection of material changes and their monitoring using innovative non destructive testing techniques would allow to plan actions in order to prevent the apparition of macroscopic damage (e.g. cracks). One major difficulty in using these particular techniques is to correlate the changes in the measured NDT signals to the microstructural changes in the material due to aging. This problem may be solved through careful microstructural examinations of the material damage. The objective of the project GRETE is to illustrate the potential use of NDT techniques for the monitoring of material degradation through two examples: neutron irradiation of reactor pressure vessel steel and thermal fatigue of piping. The purpose of this paper is to present the project and its programme of work. (author)

  19. Vacuum system for the test accumulation ring for the NUMATRON project (TARN)

    International Nuclear Information System (INIS)

    Mizobuchi, Akira

    1979-01-01

    The vacuum system for the test accumulation ring for the NUMATRON project (TARN) being constructed in the Institute for Nuclear Study, University of Tokyo, for the purpose of accumulating fundamental data on high energy, heavy ion acceleration is presented. The main specifications of TARN are as follows: repetition rate 1 Hz, average radius 5.06 m, the radius of curvature 1.333 m, circumference 31.795 m, the length of a unit cell 3.974 m, the length of a long straight section 1.8 m, the number of unit cells 8, superperiodicity 8, and the structure of a unit cell FODO. The vacuum level of TARN lower than 1 x 10 -10 Torr is necessary. The preliminary test apparatuses, number one and two, for obtaining the basic data on superhigh vacuum were constructed. The characteristics of a molecular vacuum pump and the high temperature baking effect were tested with the number one test apparatus. The glow discharge cleaning effect of the model vacuum chamber for deflecting magnets was tested, utilizing the number two test apparatus. The pressure curve in course of time during pump down, the residual gas components, the residual gas spectrum in vacuum state and the change of residual gas components before and after the glow discharge cleaning are shown as these testing results. The vacuum gauges, which are used for TARN for measuring both the total pressure and the partial pressure of gas, are explained. The vacuum system, the vacuum chamber, the vacuum pumps, the expected exhausting speed and the partial functional test results for the vacuum system are introduced. (Nakai, Y.)

  20. 60-MW test using the 30-MW klystrons for the KEKB project

    Science.gov (United States)

    Fukuda, S.; Michizono, S.; Nakao, K.; Saito, Y.; Anami, S.

    1995-07-01

    The B-Factory is a future plan, requiring an energy upgrade of the KEK linac from 2.5 GeV to 8.0 GeV (KEKB Project). This paper describes the recent development of an S-band high-power pulse klystron to be used as the PF-linac rf-source of the B-Factory. This tube is a modified version of the existing 30-MW tube, which produces 51 MW at a 310 kV beam voltage by optimizing the focusing magnetic field. In order to increase the reliability, the cathode diameter, the gun housing, and the insulation ceramic-seal were enlarged. This tube was redesigned so as to have the same characteristics as the test results of 30-MW tubes at a higher applied voltage without changing the rf interaction region. Four prototype tubes have been manufactured; final test results showed that these new tubes produce an output power of more than 50 MW at 310 kV with an efficiency of 46%. Recently this tube has produced more than 60 MW at a 350 kV beam voltage for a demonstration test. A comparison between the FCI-code prediction and the test results is also given in this paper.

  1. Development/Testing of a Monitoring System Assisting MCI Patients: The European Project INLIFE.

    Science.gov (United States)

    Kaimakamis, Evangelos; Karavidopoulou, Vaia; Kilintzis, Vassilios; Stefanopoulos, Leandros; Papageorgiou, Valentini

    2017-01-01

    INLIFE is a project cofounded from the European Union aiming in prolonging independent living of elderly people with cognitive impairment based on open, seamless ICT services supporting communication, daily activities, providing health services and professional care to the elderly. The main innovation stems from ICT solutions offering 19 different services adapted on specific characteristics elderly people with mild cognitive impairment, early and later stages of Dementia, cognitive impairment and co-morbid condition, as well as their formal and informal caregivers. All services have different focus areas and are incorporated into a unified system based on cloud architecture implemented in patients of 6 European countries, including Greece. More than 1200 patients, caregivers and healthcare providers participate in the pilot testing of the project. Primary parameter for assessing the effectiveness of the interventions is their impact on the quality of life of the elderly patients and their caregivers, contributing to prolonging independent living of the affected. A special digital platform has been developed in the Greek pilot site aiming to adapt and monitor all the implemented applications. This includes a medical decision support system that receives biosignals from patients and interaction interfaces in which all participants are involved. Recruitment and patients' participation has already started in the pilot site of Thessaloniki for the services that are to be tested in Greece.

  2. The HAW-Project. Test disposal of highly radioactive radiation sources in the Asse salt mine. Final report

    International Nuclear Information System (INIS)

    Rothfuchs, T.; Cuevas, C. de las; Donker, H.; Feddersen, H.K.; Garcia-Celma, A.; Gies, H.; Goreychi, M.; Graefe, V.; Heijdra, J.; Hente, B.; Jockwer, N.; LeMeur, R.; Moenig, J.; Mueller, K.; Prij, J.; Regulla, D.; Smailos, E.; Staupendahl, G.; Till, E.; Zankl, M.

    1995-01-01

    In order to improve the final concept for the disposal of high-level radioactive waste (HAW) in boreholes drilled into salt formation plans were developed a couple of years ago for a full scale testing of the complete technical system of an underground repository. To satisfy the test objectives, thirty highly radioactive radiation sources were planned to be emplaced in six boreholes located in two test galleries at the 800-m-level in the Asse salt mine. A duration of testing of approximately five years was envisaged. Because of licensing uncertainties the German Federal Government decided on December 3rd, 1992 to stop all activities for the preparation of the test disposal immediately. In the course of the preparation of the test disposal, however, a system, necessary for handling of the radiation sources was developed and installed in the Asse salt mine and two non-radioactive reference tests with electrical heaters were started in November 1988. These tests served for the investigation of thermal effects in comparison to the planned radioactive tests. An accompanying scientific investigation programme performed in situ and in the laboratory comprises the estimation and observation of the thermal, radiation-induced, and mechanical interaction between the rock salt and the electrical heaters and the radiation sources, respectively. The laboratory investigations are carried out at Braunschweig (FRG), Petten (NL), Saclay (F) and Barcelona (E). As a consequence of the premature termination of the project the working programme was revised. The new programme agreed to by the project partners included a controlled shutdown of the heater tests in 1993 and a continuation of the laboratory activities until the end of 1994. (orig.)

  3. The Sagebrush Steppe Treatment Evaluation Project (SageSTEP): a test of state-and-transition theory

    Science.gov (United States)

    James D. McIver; Mark Brunson; Steve C. Bunting; Jeanne Chambers; Nora Devoe; Paul Doescher; James Grace; Dale Johnson; Steve Knick; Richard Miller; Mike Pellant; Fred Pierson; David Pyke; Kim Rollins; Bruce Roundy; Eugene Schupp; Robin Tausch; David Turner

    2010-01-01

    The Sagebrush Steppe Treatment Evaluation Project (SageSTEP) is a comprehensive, integrated, long-term study that evaluates the ecological effects of fire and fire surrogate treatments designed to reduce fuel and to restore sagebrush (Artemisia spp.) communities of the Great Basin and surrounding areas. SageSTEP has several features that make it ideal for testing...

  4. Impact of HPV testing, HPV vaccine development, and changing screening frequency on national Pap test volume: projections from the National Health Interview Survey (NHIS).

    Science.gov (United States)

    Eltoum, Isam A; Roberson, Janie

    2007-02-25

    The frequently cited number of 50 million annual Papanicolaou cervical screening (Pap) tests performed in the US was based on the National Health Interview Survey (NHIS) of the 1980s. Since then, monumental changes have occurred. More change will soon follow when primary human papilloma virus (HPV) testing and/or HPV vaccine delivery are fully accepted and implemented. The objectives of this study were 1) to estimate the total annual Pap tests performed in the US based on recent NHIS surveys, and 2) to estimate the potential change in the total annual Pap volume produced by changing demographics, reduced screening frequency, HPV testing, and the HPV vaccine. In the NHIS 2000 and NHIS 2005, women were asked to report the frequency of their Pap tests for the 6 years prior to the interview and to report whether they had abnormal findings. The authors analyzed the survey respondents answers to these questions by using SAS Survey Procedures (SAS Institute, NC). The results were stratified by age, and the total national volume was then extrapolated from a similarly stratified 2000 US census. The projected increase of total Pap tests for the next 25 years was determined by using the projected census data. Potential reductions of Pap tests performed secondarily to HPV testing of women >30 years old and of HPV vaccination were also determined. Based on NHIS 2000 and NHIS 2005, 66 million (95% CI, 65-68) and 65 million (95% CI, 64-67) Pap tests were performed in the US, respectively. Had HPV testing been performed in women older than 30 years who had both negative HPV and negative 3-year Pap tests, then 30% (95% CI, 29-32%) of Pap tests would not have been performed. If both HPV testing and vaccination are performed, the total number of Pap tests performed annually is predicted to be reduced by 43% (95% CI, 35-38%). Therefore, despite an expected increase in the population of women eligible for Pap tests, the total number will likely decrease substantially in the future

  5. Spanish normative studies in young adults (NEURONORMA young adults project): norms for verbal fluency tests.

    Science.gov (United States)

    Casals-Coll, M; Sánchez-Benavides, G; Quintana, M; Manero, R M; Rognoni, T; Calvo, L; Palomo, R; Aranciva, F; Tamayo, F; Peña-Casanova, J

    2013-01-01

    Lexical fluency tests are frequently used in clinical practice to assess language and executive function. As part of the Spanish normative studies project in young adults (NEURONORMA young adults project), we provide age- and education-adjusted normative data for 3 semantic fluency tasks (animals, fruits and vegetables, and kitchen tools), three formal lexical fluency tasks (words beginning with P, M and R), three excluded-letter fluency tasks (words excluding A, E and S) and a verb fluency task. The sample consisted of 179 participants who are cognitively normal and range in age from 18 to 49 years. Tables are provided to convert raw scores to scaled scores. Age- and education-adjusted scores are provided by applying linear regression techniques. The results show that education impacted most of the verbal fluency test scores, with no effects related to age and only minimal effects related to sex. The norms obtained will be extremely useful in the clinical evaluation of young Spanish adults. Copyright © 2011 Sociedad Española de Neurología. Published by Elsevier Espana. All rights reserved.

  6. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  7. Environmental Assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  8. Isotope detectors and radiation detectors for test reliability techniqui. A preliminary project

    International Nuclear Information System (INIS)

    Christell, R.

    1977-03-01

    A survey is done of small and simple components for use as detectors for ionizing radiation, as well as different methods and components producing images of radiation fields based on position sensitive detectors. The investigation has resulted in a system for detection of stones in wood. In a second project isotope excited x ray fluorescence has been used for analysis of material resulting from wear of mechanical components. A facility for analysis has been built and test analysis has been performed. Methods for continous wear control with possibility to forecast breakdowns have been investigated. (K.K.)

  9. Overview of the system alone and system/CFD coupled calculations of the PHENIX Natural Circulation Test within the THINS project

    Energy Technology Data Exchange (ETDEWEB)

    Pialla, David, E-mail: david.pialla@cea.fr [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Tenchine, Denis [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Li, Simon [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 91191 Gif-sur-Yvette Cedex (France); Gauthe, Paul; Vasile, Alfredo [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DER/SESI, 13108 Saint Paul Lez Durance Cedex (France); Baviere, Roland; Tauveron, Nicolas; Perdu, Fabien [Commissariat à l’Energie Atomique et aux Energies Alternatives (CEA), DEN/DM2S/STMF, 17 rue des martyrs, 38054 Grenoble Cedex 9 (France); Maas, Ludovic; Cocheme, François [Institut de Radioprotection et de Sûreté Nucléaire (IRSN), PSN/SEMIA/BAST, B.P. 17, 92262 Fontenay-aux-Roses Cedex (France); Huber, Klaus; Cheng, Xu [Karlsruhe Institute of Technology (KIT), Institute of Fusion and Reactor Technology (IFRT), Kaiserstraße 12, Building 07.08, 76131 Karlsruhe (Germany)

    2015-08-15

    Highlights: • The PHENIX natural convection test performed during the end of life tests program. • The calculation with system codes and theirs limits. • The calculation with coupling CFD and system code, which allows better prediction. • The tasks of code validation have been done in the frame of the THINS project. - Abstract: The PHENIX sodium cooled fast reactor started operation in 1973 and was shut down in 2009. Before decommissioning, an ultimate test program was designed and performed to provide valuable data for the development of future sodium cooled fast reactors, as the so-called Astrid prototype in France. Among these ultimate tests, a thermal-hydraulic Natural Convection Test (NCT) was set-up in June 2009. Starting from a reduced power state of 120 MWt, the NCT consists of a loss of the heat sink combined with a reactor scram and a primary pumps trip leading to stabilized natural circulation in the primary sodium system. The thermal-hydraulics innovative system project (THINS project), sponsored by the European Community in the frame of the 7th FP has selected this transient for validation of both stand-alone system code simulations and coupled simulations using system and CFD codes. Participants from three organizations (CEA, IRSN and KIT) have addressed this transient using different system codes (CATHARE, DYN2B and ATHLET) and CFD codes (TRIO-U and OPEN FOAM). The present paper depicts the different modeling approaches, methodologies and compares the numerical results with the available experimental data. Finally, the main lessons learned from the work performed within the THINS project on the PHENIX NCT with respect to code development and validation are summarized.

  10. The Florida Ranchlands Environmental Services Project: Field Testing a Pay-for-Environmental-Services Program

    OpenAIRE

    Lynch, S.; Shabman, L.

    2007-01-01

    The Florida Ranchlands Environmental Services Project (FRESP) was recently launched, which will field test a program to complement the existing restoration programs such as the Lake Okeechobee Protection Plan (LOPP), which uses public funding to build treatment wetlands, drill aquifer storage, and capture rainwater (to delay its arrival downstream). FRESP will pay cattle ranchers to provide environmental services that will benefit the lake. PES-1 (Payments for Environmental Services Associ...

  11. Pilot project - demonstration of capabilities and benefits of bridge load rating through physical testing : tech transfer summary.

    Science.gov (United States)

    2013-08-01

    This project demonstrated the capabilities for load testing bridges in Iowa, developed and presented a webinar to local and state engineers, and produced a spreadsheet and benefit evaluation matrix that others can use to preliminarily assess where br...

  12. Apollo-Soyuz test project. Volume 1: Astronomy, earth atmosphere and gravity field, life sciences, and materials processing

    Science.gov (United States)

    1977-01-01

    The joint U.S.-USSR experiments and the U.S. conducted unilateral experiments performed during the Apollo Soyuz Test Project are described. Scientific concepts and experiment design and operation are discussed along with scientific results of postflight analysis.

  13. The Test Blanket Modules project in Europe: From the strategy to the technical plan over next ten years

    International Nuclear Information System (INIS)

    Poitevin, Y.; Zmitko, M.; Orco, G. dell; Laesser, R.; Diegele, E.; Sundstroem, J.; Boccaccini, L.; Salavy, J.-F.

    2006-01-01

    The testing of Breeding Blanket concepts in ITER is recognized as an essential milestone in the development of a future reactor ensuring tritium self-sufficiency, extraction of high grade heat and electricity production. Europe is currently developing two reference breeding blankets for DEMO reactor specifications that will be tested in ITER: the Helium-Cooled Lithium-Lead (HCLL) blanket which uses the eutectic Pb-15. 7 Li as both breeder and neutron multiplier, and the Helium-Cooled Pebble-Bed (HCPB) blanket which features lithiated ceramic pebbles (Li 4 SiO 4 or Li 2 TiO 3 ) as breeder and beryllium pebbles as neutron multiplier. Both blankets are using the pressurized He technology for heat extraction (8 MPa, inlet/outlet temperature 300/500 o C) and a 9% CrWVTa Reduced Activation Ferritic Martensitic (RAFM) steel as structural material, the EUROFER. Referring to the so called '' fast-track '' EU scenario, those concepts are intended to be tested in ITER, getting the maximum of information required for launching the DEMO blanket design and construction after the first 10 years of ITER operation. For that, the EU has adopted a blanket testing strategy based on the development of Test Blanket Modules (TBMs) that are expected to use DEMO relevant technologies and are designed for each ITER plasma phase to optimize the feedback and to avoid any impact on ITER availability. Following the decision on ITER construction, the EU has reviewed and detailed the fundamental elements for an implementation of the future EU TBMs Project aimed at delivering TBMs Systems to ITER under suitable schedule and acceptance standards. For that the following items have been analyzed in detail and are reported in the present paper: · Impact of the ITER environment (design, standards, schedule, operational scheme) on the TBM systems design and development plan · Project technical plan with focus on the next ten years up to the installation of the first TBMs in ITER · Project risk

  14. Design of 8-ft-Diameter Barrel Test Article Attachment Rings for Shell Buckling Knockdown Factor Project

    Science.gov (United States)

    Lovejoy, Andrew E.; Hilburger, Mark W.

    2010-01-01

    The Shell Buckling Knockdown Factor (SBKF) project includes the testing of sub-scale cylinders to validate new shell buckling knockdown factors for use in the design of the Ares-I and Ares-V launch vehicles. Test article cylinders represent various barrel segments of the Ares-I and Ares-V vehicles, and also include checkout test articles. Testing will be conducted at Marshall Space Flight Center (MSFC) for test articles having an eight-foot diameter outer mold line (OML) and having lengths that range from three to ten feet long. Both ends of the test articles will be connected to the test apparatus using attachment rings. Three multiple-piece and one single-piece design for the attachment rings were developed and analyzed. The single-piece design was chosen and will be fabricated from either steel or aluminum (Al) depending on the required safety factors (SF) for test hardware. This report summarizes the design and analysis of these attachment ring concepts.

  15. In Vitro Screening of Environmental Chemicals for Targeted Testing Prioritization: The ToxCast Project

    OpenAIRE

    Judson, Richard S.; Houck, Keith A.; Kavlock, Robert J.; Knudsen, Thomas B.; Martin, Matthew T.; Mortensen, Holly M.; Reif, David M.; Rotroff, Daniel M.; Shah, Imran; Richard, Ann M.; Dix, David J.

    2009-01-01

    Background Chemical toxicity testing is being transformed by advances in biology and computer modeling, concerns over animal use, and the thousands of environmental chemicals lacking toxicity data. The U.S. Environmental Protection Agency?s ToxCast program aims to address these concerns by screening and prioritizing chemicals for potential human toxicity using in vitro assays and in silico approaches. Objectives This project aims to evaluate the use of in vitro assays for understanding the ty...

  16. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  17. Electrical/instrumentation acceptance test report for Project C-018H, 242-A Evaporator/PUREX Plant condensate treatment facility

    International Nuclear Information System (INIS)

    Compau, R.A. Jr.

    1995-01-01

    This project is part of the 200 Area Effluent Treatment Facility. The acceptance test procedure describes test methods for leak detection units, pump flow switches, pump level control valves, room air temperature monitor, leachate pump status contacts, basin pump status contacts, catch basin leak detector, leachate level monitors, and basin level monitors. These are all components of the C-018H Collection System

  18. Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

    Science.gov (United States)

    Barta, Daniel J.; Edeen, Marybeth A.; Henninger, Donald L.

    2006-01-01

    The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30, 60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized

  19. Test and characterization of multigap resistive plate chambers for the EEE project

    CERN Document Server

    Bossini, E

    2016-01-01

    The Extreme Energy Events project is based on the deployment of cosmic-ray telescopes in Italian high schools with the active contribution of students and teachers. Each telescope is made by three Multigap Resistive Plate Chambers readout by strips. With around 50 telescopes already built and others under construction, specific systems to test and characterize the chambers are needed. In this article I will present a flexible and software-configurable solution to perform chamber efficiency studies with a set of scintillators and hardware to automatically scan detector strips to identify electrical issues. Both systems can provide accurate information but at the same time they can be easily operated by students.

  20. Application of NEPA to nuclear weapons production, storage, and testing Weinberger v. Catholic Action of Hawaii/Peace Education Project

    International Nuclear Information System (INIS)

    Sauber, A.J.

    1984-01-01

    The National Environmental Policy Act (NEPA) requirement of environmental impact statements for the testing of military equipment, specifically nuclear weapons, conflicts with national security objectives. The author examines NEPA and the Freedom of Information Act (FOIA) in terms of the environmental effects of weapons testing and the relevant case law. The Supreme Court's decision in Catholic Action of Hawaii/Peace Education Project sought to resolve the conflict by distinguishing between a project which is contemplated and one which is proposed. The classification scheme embodied in the FOIA exemption for national security may cause unwarranted frustration of NEPA's goals. The author outlines a new classification system and review mechanism that could curb military abuse in this area

  1. Projects on filter testing in Sweden

    International Nuclear Information System (INIS)

    Normann, B.; Wiktorsson, C.

    1985-01-01

    The Swedish nuclear power program comprises twelve light water reactors. Nine are boiling water reactors of ASEA-ATOM design and three are pressurized water reactors of Westinghouse design. Of these, ten are in operation and two are under construction and planned to go into operation during late 1984 and early 1985, respectively. Frequent tests on the penetration of particles through HEPA filters, regular tests on the adsorption of methyl iodide in the stand-by carbon filter units by laboratory testing are discussed. The proposed new regulations are based on many years of experience of filter system operation and of tests in-situ and in the laboratory. Moisture and water are factors that affect the functioning of filters. In addition, high loading of dust can give rise to increased penetration through HEPA filters, however pinholes could have less influence on the total penetration. Laboratory tests show that DOP particles retain 30-40% in 90 mm carbon filters (8-12 mesh). However no effect on the ability of carbon to adsorb methyl iodide after DOP contamination in combined carbon/HEPA filters has been observed. Leakage from ventilation ducts can cause radioactive contamination problems during filter testing with radioiodine. In-situ testing of control-room filters has been performed using inactive methyl iodide. A type of carbon bed not previously used in Sweden has been introduced. Testing of this filter type is discussed

  2. Framework for Testing the Effectiveness of Bat and Eagle Impact-Reduction Strategies at Wind Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin [National Renewable Energy Lab. (NREL), Golden, CO (United States); DeGeorge, Elise [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-04-13

    The objectives of this framework are to facilitate the study design and execution to test the effectiveness of bat and eagle impact-reduction strategies at wind energy sites. Through scientific field research, the wind industry and its partners can help determine if certain strategies are ready for operational deployment or require further development. This framework should be considered a living document to be improved upon as fatality-reduction technologies advance from the initial concepts to proven readiness (through project- and technology-specific testing) and as scientific field methods improve.

  3. IMAGE Project: Results of Laboratory Tests on Tracers for Supercritical Conditions.

    Science.gov (United States)

    Brandvoll, Øyvind; Opsahl Viig, Sissel; Nardini, Isabella; Muller, Jiri

    2016-04-01

    The use of tracers is a well-established technique for monitoring dynamic behaviour of water and gas through a reservoir. In geothermal reservoirs special challenges are encountered due to high temperatures and pressures. In this work, tracer candidates for monitoring water at supercritical conditions (temperature > 374°C, pressure ca 218 bar), are tested in laboratory experiments. Testing of tracers at supercritical water conditions requires experimental set-ups which tolerate harsh conditions with respect to high temperature and pressure. In addition stringent HES (health, environment and safety) factors have to be taken into consideration when designing and performing the experiments. The setup constructed in this project consists of a pressure vessel, high pressure pump, instrumentation for pressure and temperature control and instrumentation required for accurate sampling of tracers. In order to achieve accurate results, a special focus has been paid to the development of the tracer sampling technique. Perfluorinated cyclic hydrocarbons (PFCs) have been selected as tracer candidates. This group of compounds is today commonly used as gas tracers in oil reservoirs. According to the literature they are stable at temperatures up to 400°C. To start with, five PFCs have been tested for thermal stability in static experiments at 375°C and 108 bar in the experimental setup described above. The tracer candidates will be further tested for several months at the relevant conditions. Preliminary results indicate that some of the PFC compounds show stability after three months. However, in order to arrive at conclusive results, the experiments have to be repeated over a longer period and paying special attention to more accurate sampling procedures.

  4. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  5. Lessons learned in the deployment of a HIV counseling and testing management information system on a new project.

    Science.gov (United States)

    Makinde, Olusesan A; Ezomike, Chioma F; Lehmann, Harold P; Ibanga, Iko J

    2011-11-28

    To share our experience on how we used simple but detailed processes and deployed a management information system on a new HIV counseling and testing (HCT) project in Nigeria. The procedures used in this study were adopted for their strength in identifying areas of continuous improvement as the project was implemented. We used an iterative brainstorming technique among 30 participants (volunteer counselors and project management staff) as well as iterative quality audits to identify several limitations to the success of the project and to propose solutions. We then implemented the solutions and reevaluated for performance. Findings from the evaluations were then reintroduced into the brainstorming and planning sessions. Several limitations were identified with the most prominent being the poor documentation of records at the site and the lack of a document transfer trail for audit purposes. Communication, cohesion and team focus are necessary to achieve success on any new project. Institutionalizing routine HIV behavioral surveillance using data collected at HCT will help in streamlining interventions that will be evidence-based. 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins

  6. Validation of Material Models For Automotive Carbon Fiber Composite Structures Via Physical And Crash Testing (VMM Composites Project)

    Energy Technology Data Exchange (ETDEWEB)

    Coppola, Anthony [General Motors Company, Flint, MI (United States); Faruque, Omar [Ford Motor Company, Dearborn, MI (United States); Truskin, James F [FCA US LLC, Auburn Hills, MI (United States); Board, Derek [Ford Motor Company, Dearborn, MI (United States); Jones, Martin [Ford Motor Company, Dearborn, MI (United States); Tao, Jian [FCA US LLC, Auburn Hills, MI (United States); Chen, Yijung [Ford Motor Company, Dearborn, MI (United States); Mehta, Manish [M-Tech International LLC, Dubai (United Arab Emirates)

    2017-09-27

    As automotive fuel economy requirements increase, the push for reducing overall vehicle weight will likely include the consideration of materials that have not previously been part of mainstream vehicle design and manufacturing, including carbon fiber composites. Vehicle manufacturers currently rely on computer-aided engineering (CAE) methods as part of the design and development process, so going forward, the ability to accurately and predictably model carbon fiber composites will be necessary. If composites are to be used for structural components, this need applies to both, crash and quasi-static modeling. This final report covers the results of a five-year, $6.89M, 50% cost-shared research project between Department of Energy (DOE) and the US Advanced Materials Partnership (USAMP) under Cooperative Agreement DE-EE-0005661 known as “Validation of Material Models for Automotive Carbon Fiber Composite Structures Via Physical and Crash Testing (VMM).” The objective of the VMM Composites Project was to validate and assess the ability of physics-based material models to predict crash performance of automotive primary load-carrying carbon fiber composite structures. Simulation material models that were evaluated included micro-mechanics based meso-scale models developed by the University of Michigan (UM) and micro-plane models by Northwestern University (NWU) under previous collaborations with the DOE and Automotive Composites Consortium/USAMP, as well as five commercial crash codes: LS-DYNA, RADIOSS, VPS/PAM-CRASH, Abaqus, and GENOA-MCQ. CAE predictions obtained from seven organizations were compared with experimental results from quasi-static testing and dynamic crash testing of a thermoset carbon fiber composite front-bumper and crush-can (FBCC) system gathered under multiple loading conditions. This FBCC design was developed to demonstrate progressive crush, virtual simulation, tooling, fabrication, assembly, non-destructive evaluation and crash testing

  7. Project size and common pool size: An empirical test using Danish municipal mergers

    DEFF Research Database (Denmark)

    Hansen, Sune Welling

    The paper examines the proposition that project size tends to increase with common pool size from the law of 1 over n (Weingast et al, 1981). This remains under-investigated and a recent study conducted by Primo & Snyder (2008) argues, and empirically substantiates, a reverse law of 1 over n...... across two research designs, two outcome variables, two subsamples, and several model specifications The implications of the findings, combined with the limited potential for empirically testing Primo & Snyder’s alternative model, suggest a re-appreciation of the law of 1 over n as it was originally...

  8. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  9. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2009-01-01

    The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals.......The Web Portal Usability (WPU) project is working on usability engineering methods, which are important in the development of Web portals. These methods are tested with companies that design modern Web portals....

  10. Providing Home-Based HIV Testing and Counseling for Transgender Youth (Project Moxie): Protocol for a Pilot Randomized Controlled Trial.

    Science.gov (United States)

    Stephenson, Rob; Metheny, Nicholas; Sharma, Akshay; Sullivan, Stephen; Riley, Erin

    2017-11-28

    Transgender and gender nonconforming people experience some of the highest human immunodeficiency virus (HIV) rates in the United States, and experience many structural and behavioral barriers that may limit their engagement in HIV testing, prevention, and care. Evidence suggests that transgender and gender nonconforming youth (TY) are especially vulnerable to acquiring HIV, yet there is little research on TY and few services are targeted towards HIV testing, prevention, and care for this population. Telehealth presents an opportunity to mitigate some structural barriers that TY experience in accessing HIV testing, allowing TY to engage in HIV testing and counseling in a safe and nonjudgmental space of their choosing. Project Moxie is an HIV prevention intervention that pairs the use of HIV self-testing with remote video-based counseling and support from a trained, gender-affirming counselor. This study aims to offer a more positive HIV testing and counseling experience, with the goal of improving HIV testing frequency. Project Moxie involves a pilot randomized controlled trial (RCT) of 200 TY aged 15-24 years, who are randomized on a 1:1 basis to control or intervention arms. The aim is to examine whether the addition of counseling provided via telehealth, coupled with home-based HIV testing, can create gains in routine HIV testing among TY over a six-month follow-up period. This study implements a prospective pilot RCT of 200 TY recruited online. Participants in the control arm will receive one HIV self-testing kit and will be asked to report their results via the study's website. Participants in the experimental arm will receive one HIV self-testing kit and will test with a remotely-located counselor during a prescheduled video-counseling session. Participants are assessed at baseline, and at three and six months posttesting. Project Moxie was launched in June 2017 and recruitment is ongoing. As of August 21, 2017, the study had enrolled 130 eligible

  11. Dredging and projecting the depths of personality: the thematic apperception test and the narratives of the unconscious.

    Science.gov (United States)

    Miller, Jason

    2015-03-01

    The Thematic Apperception Test (TAT) was a projective psychological test created by Harvard psychologist Henry A. Murray and his lover Christina Morgan in the 1930s. The test entered the nascent intelligence service of the United States (the OSS) during the Second World War due to its celebrated reputation for revealing the deepest aspects of an individual's unconscious. It subsequently spread as a scientifically objective research tool capable not only of dredging the unconscious depths, but also of determining the best candidate for a management position, the psychological complexes of human nature, and the unique characteristics of a culture. Two suppositions underlie the utility of the test. One is the power of narrative. The test entails a calculated abuse of the subjects tested, based on their inability to interpret their own narrative. The form of the test requires that a subject fail to decipher the coded, unconscious meaning their narrative reveals. Murray believed the interpretation of a subject's narrative and the projection contained therein depended exclusively on the psychologist. This view of interpretation stems from the seemingly more reasonable belief of nineteenth-century Romantic thinkers that a literary text serves as a proxy for an author's deepest self. The TAT also supposes that there is something beyond consciousness closely resembling a psychoanalytic unconscious, which also has clear precedents in nineteenth-century German thought. Murray's views on literary interpretation, his view of psychology as well as the continuing prevalence of the TAT, signals a nineteenth-century concept of self that insists "on relations of depth and surface, inner and outer life" (Galison 2007, 277). It is clear the hermeneutic practice of Freud's psychoanalysis, amplified in Jung, drew on literary conceptions of the unconscious wider than those of nineteenth-century psychology.

  12. Cold test plan for the Old Hydrofracture Facility tank contents removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-11-01

    This Old Hydrofracture Facility (OHF) Tanks Contents Removal Project Cold Test Plan describes the activities to be conducted during the cold test of the OHF sluicing and pumping system at the Tank Technology Cold Test Facility (TTCTF). The TTCTF is located at the Robotics and Process Systems Complex at the Oak Ridge National Laboratory (ORNL). The cold test will demonstrate performance of the pumping and sluicing system, fine-tune operating instructions, and train the personnel in the actual work to be performed. After completion of the cold test a Technical Memorandum will be prepared documenting completion of the cold test, and the equipment will be relocated to the OHF site

  13. Studsvik`s fuel R and D projects

    Energy Technology Data Exchange (ETDEWEB)

    Grounes, M [Studsvik Nuclearr AB, Nykoping (Sweden)

    1997-08-01

    The report reviews some recently performed, ongoing and planned fuel R and D projects, executed by Studsvik Nuclear AB, a subsidiary of Studsvik AB. Data from these projects are used as experimental support for fuel modelling at high burnup. Much of Studsvik Nuclear`s R and D work has been concentrated on fuel testing, which can be made in the R2 test reactor with high precision under realistic water reactor conditions. This type of work started in the early 1960s. The fuel testing projects executed at Studsvik have been organized under three different types of sponsorship: International (multilateral) fuel projects: jointly sponsored internationally on a world-wide basis, with project information remaining restricted to the project participants throughout the project`s duration and for some pre-determined time after project completion; Bilateral fuel projects: sponsored by one single organization, or a few co-operating organizations, with project information remaining restricted to the sponsor, sometimes published later; in-house R and D work: sponsored by Studsvik Nuclear. The fuel testing activities can be divided into a number of well-defined steps as follows: Base irradiation, performed in a power reactor, or in Studsvik`s R2 test reactor; power ramping and/or other in-pile measurements, performed in Studsvik`s R2 test reactor. Non-destructive testing between different phases of an experiment, performed in Studsvik`s R2 reactor pool, or in Studsvik`s Hot Cell Laboratory; destructive post-irradiation examinations, performed in Studsvik`s Hot Cell Laboratory, or in the sponsor`s hot cell laboratory. 47 refs, 2 tabs.

  14. Problems studied within the state research project New Methods of Nondestructive Materials Testing Using Ionizing Radiation

    International Nuclear Information System (INIS)

    Mysak, F.; Strba, J.

    1979-01-01

    A state research project is described divided into ten subprojects, viz.: New trends of ionizing radiation detection using television technology in nondestructive testing; the application of accelerators for thick-walled product testing; the atlas of butt welds of medium thicknesses; the application of radioanalytical methods in testing the wear of gearboxes and other components of instrument parts; multielemental analyses of combustion engine wear using radionuclides; the application of radioisotope methods in research into wear of antifriction bearings of trucks and railway cars; the application of radionuclides in assessing corrosion resistance of steels and corrosion protection systems; the application of radionuclide methods in improving the quality of high-grade steel production; the selection and testing of radionuclide instruments for building production control, intermediate and acceptance checks; and radioisotope methods for building machine and equipment control. (M.S.)

  15. Mobile Tech and the Librarian: The iTest iPad Project.

    Science.gov (United States)

    Hamasu, Claire; Bramble, John

    A 2012 project provided forty-eight health sciences librarians from primarily hospital and academic health sciences libraries with an Apple iPad2 along with training and support on its use. Project objectives were to determine how participants would adopt the iPad into their daily operations and what form of leadership role they would play while participating in the project. By project's end eighty-nine percent indicated they would continue using the iPad primarily as a productivity tool and to provide point of need services. Project data indicated that librarians assumed a leadership role promoting the use of mobile technology and the applications available.

  16. Mobile Tech and the Librarian: The iTest iPad Project

    Science.gov (United States)

    Hamasu, Claire; Bramble, John

    2015-01-01

    A 2012 project provided forty-eight health sciences librarians from primarily hospital and academic health sciences libraries with an Apple iPad2 along with training and support on its use. Project objectives were to determine how participants would adopt the iPad into their daily operations and what form of leadership role they would play while participating in the project. By project's end eighty-nine percent indicated they would continue using the iPad primarily as a productivity tool and to provide point of need services. Project data indicated that librarians assumed a leadership role promoting the use of mobile technology and the applications available. PMID:26997921

  17. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  18. Acid Pit Stabilization Project (Volume 1 - Cold Testing) and (Volume 2 - Hot Testing)

    International Nuclear Information System (INIS)

    Loomis, G. G.; Zdinak, A. P.; Ewanic, M. A.; Jessmore, J. J.

    1998-01-01

    During the summer and fall of Fiscal Year 1997, a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Treatability Study was performed at the Idaho National Engineering and Environmental Laboratory. The study involved subsurface stabilization of a mixed waste contaminated soil site called the Acid Pit. This study represents the culmination of a successful technology development effort that spanned Fiscal Years 1994-1996. Research and development of the in situ grout stabilization technique was conducted. Hardware and implementation techniques are currently documented in a patent pending with the United States Patent and Trademark Office. The stabilization technique involved using jet grouting of an innovative grouting material to form a monolith out of the contamination zone. The monolith simultaneously provides a barrier to further contaminant migration and closes voids in the soil structure against further subsidence. This is accomplished by chemical incorporation of contaminants into less soluble species and achieving a general reduction in hydraulic conductivity within the monolith. The grout used for this study was TECT-HG, a relatively dense iron oxide-based cementitious grout. The treatability study involved cold testing followed by in situ stabilization of the Acid Pit. Volume 1 of this report discusses cold testing, performed as part of a ''Management Readiness Assessment'' in preparation for going hot. Volume 2 discusses the results of the hot Acid Pit Stabilization phase of this project. Drilling equipment was specifically rigged to reduce the spread of contamination, and all grouting was performed under a concrete block containing void space to absorb any grout returns. Data evaluation included examination of implementability of the grouting process and an evaluation of the contaminant spread during grouting. Following curing of the stabilized pit, cores were obtained and evaluated for toxicity characteristic leach ing

  19. Development of a non-engine fuel injector deposit test for alternative fuels (ENIAK-project)

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, Hajo; Pohland vom Schloss, Heide [OWI - Oel Waerme Institut GmbH, Herzogenrath (Germany)

    2013-06-01

    Deposit formation in and on the injectors of diesel engines may lead to injector malfunction, resulting in a loss in power, rough engine operation and poor emission levels. Poor Biodiesel quality, contamination with copper and zinc as well as undesired reactions between (several) additives and biodiesel components are known causes for nozzle fouling. Therefore, good housekeeping when using biodiesel is required, and all additives have to pass a no-harm test concerning injector fouling. The standard fouling tests are two engine tests: The XUD9-test (CEC F-23-01) and the DW-10-test (CEC DF 98-08). The XUD9 is a cost efficient, fast and proven testing method. It uses, however, an obsolete indirect injection diesel engine and cannot reproduce internal diesel injector deposits (IDID). The newer DW10 test is complex, costly and designed for high stress. This reduces the engine life and leads to a fuel consumption of approximately 1,000 1 per test, both contributing to the high costs of the test. The ENIAK-Project is funded by the FNR (''Fachagentur Nachwachsende Rohstoffe'', Agency for Renewable Resources) and conducted in cooperation with AGQM, ASG and ERC. Its main goal is the development, assembly, commissioning, and evaluation of a non-engine fuel injector test. It uses a complete common rail system. The injection takes place in a self-designed reactor instead of an engine, and the fuel is not combusted, but re-condensed and pumped in a circle, leading to a low amount of fuel required. If the test method proves to be as reliable as expected, it can be used as an alternative test method for injector fouling with low requirements regarding infrastructure on the testing site and sample volume. (orig.)

  20. Engineering testing and technology projects FY 1996 Site Support Program Plan, WBS 6.3.3 and 6.3.8. Revision 1

    International Nuclear Information System (INIS)

    Brown, L.C.

    1995-10-01

    The engineering laboratory services for development, assembly, testing, and evaluation to support the resolution of WHC, Hanford, and DOE complex wide engineering issues for 1996 are presented. Primary customers are: TWRS, spent nuclear fuels, transition projects, liquid effluent program, and other Hanford contractors and programs. Products and services provided include: fabrication and assembly facilities for prototype and test equipment, development testing, proof of principle testing, instrumentation testing, nondestructive examination application development and testing, prototype equipment design and assembly, chemical engineering unit operations testing, engineering test system disposal, and safety issue resolution

  1. Project NEO Specific Impulse Testing Solutions

    Science.gov (United States)

    Baffa, Bill

    2018-01-01

    The Neo test stand is currently configured to fire a horizontally mounted rocket motor with up to 6500 lbf thrust. Currently, the Neo test stand can measure flow of liquid propellant and oxidizer, pressures residing in the closed system up to the combustion chamber. The current configuration does not have the ability to provide all data needed to compute specific impulse. This presents three methods to outfit the NEO test fixture with instrumentation allowing for calculation of specific impulse.

  2. Project management of the build of the shore test facility for the prototype of PWR II

    International Nuclear Information System (INIS)

    Clarkson, D.T.

    1987-01-01

    The PWR II is a new design of nuclear steam raising plant for the Royal Navy's submarines. It features improved engineering for safety, increased power, increased shock resistance, reduced noise transmission to sea and reduced manning requirement. It is to be tested in a new prototype testing facility, the Shore Test Facility, which is a section of submarine hull containing a prototype of the nuclear steam raising plant and its support system. It is installed at the Vulcan Naval Reactor Test establishment at Dounreay in Scotland. The function of the establishment is to test new designs of core and reactor plant, validate the mathematical models used in their design, develop improved methods of operation and maintenance of the plant and test new items of equipment. The Shore Test Facility was built in large sections at Barrow-in-Furness and transported to Scotland. The project management for the construction of the Shore Test Facility is explained. It involves personnel from the Royal Navy, and a large number of people working for the contractors involved in the buildings, transportation, operation and maintenance of the Facility. (U.K.)

  3. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  4. Structural analysis of closure cap barriers: A pre-test study for the Bentonite Mat Demonstration Project

    International Nuclear Information System (INIS)

    Gong, Chung; Pelfrey, J.R.

    1993-01-01

    The Bentonite Mat Demonstration Project (BMDP) is a field demonstration study to determine the construction/installation requirements, permeability, and subsidence performance characteristics of a composite barrier. The composite barrier will consist of on-site sandy-clay blanketed by a bentonite mat and a flexible High Density Polyethylene (HDPE) liner (also called flexible membrane liner). Construction of one control test pad and three bentonite test pads are planned. The control test pad will be used to establish baseline data. Underneath the composite clay cap is a four feet thick loose sand layer in which cavities will be created by evacuation of sand. The present work provides a mathematical model for the BMDP. The mathematical model will be used to simulate the mechanical and structural responses of the composite clay cap during the testing processes. Based upon engineering experience and technical references, a set of nominal soil parameters have been selected

  5. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    Science.gov (United States)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  6. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work in a distr......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  7. Predictions of tracer transport in interwell tracer tests at the C-Hole complex. Yucca Mountain site characterization project report milestone 4077

    International Nuclear Information System (INIS)

    Reimus, P.W.

    1996-09-01

    This report presents predictions of tracer transport in interwell tracer tests that are to be conducted at the C-Hole complex at the Nevada Test Site on behalf of the Yucca Mountain Site Characterization Project. The predictions are used to make specific recommendations about the manner in which the tracer test should be conducted to best satisfy the needs of the Project. The objective of he tracer tests is to study flow and species transport under saturated conditions in the fractured tuffs near Yucca Mountain, Nevada, the site of a potential high-level nuclear waste repository. The potential repository will be located in the unsaturated zone within Yucca Mountain. The saturated zone beneath and around the mountain represents the final barrier to transport to the accessible environment that radionuclides will encounter if they breach the engineered barriers within the repository and the barriers to flow and transport provided by the unsaturated zone. Background information on the C-Holes is provided in Section 1.1, and the planned tracer testing program is discussed in Section 1.2

  8. Project W-314 specific test and evaluation plan for SN-635 transfer line (241-AY-01A to 241-AY-02A) and SN-633 transfer line tie in

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the installation of the SN-635 transfer line for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-635 transfer line and the tie in of SN-633 to the AY-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  9. Overview of hydrothermal testing of waste-package barrier materials at the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1982-01-01

    The current Waste Package Department (WPD) hydrothermal testing program for the Basalt Waste Isolation Project (BWIP) has followed a systematic approach for the testing of waste-barrier-basalt interactions based on sequential penetration of barriers by intruding groundwaters. Present test activities in the WPD program have focused on determining radionuclide solubility limits (or steady-state conditions) of simulated waste forms and the long-term stability of waste package barriers under site-specific hydrothermal conditions. The resulting data on solution compositions and solid alteration products have been used to evaluate waste form degradation under conditions specific to a nuclear waste repository located in basalt (NWRB). Isothermal, time-invariant compositional data on sampled solutions have been coupled with realistic hydrologic flow data for near-field and far-field modeling for the calculation of meaningful radionuclide release rates. Radionuclides that are not strongly sorbed or precipitated from solution and that, therefore, may require special attention to ensure their isolation within the waste package have been identified. Taken together, these hydrothermal test data have been used to establish design requirements for waste packages located in basalt

  10. Project W-151 checkout-testing report

    Energy Technology Data Exchange (ETDEWEB)

    Nordquist, E.M.

    1997-01-31

    This document contains the completed checkout testing plan along with the exception log documenting exceptions which occurred during the test and their closure. This document also contains several minor open exceptions which will be closed upon installation of the radiation-sensitive equipment.

  11. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  12. A critical review of the life sciences project management at Ames Research Center for the Spacelab Mission development test 3

    Science.gov (United States)

    Helmreich, R. L.; Wilhelm, J. M.; Tanner, T. A.; Sieber, J. E.; Burgenbauch, S. F.

    1979-01-01

    A management study was initiated by ARC (Ames Research Center) to specify Spacelab Mission Development Test 3 activities and problems. This report documents the problems encountered and provides conclusions and recommendations to project management for current and future ARC life sciences projects. An executive summary of the conclusions and recommendations is provided. The report also addresses broader issues relevant to the conduct of future scientific missions under the constraints imposed by the space environment.

  13. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  14. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  15. Exploring experience of family relations by patients with anorexia nervosa and bulimia nervosa using a projective family test.

    Science.gov (United States)

    Fäldt Ciccolo, Erica B

    2008-08-01

    Elements of family dynamics have been shown to be related to onset, course, as well as prognosis of anorexia nervosa and bulimia nervosa. The goal was to explore the experience of family relations in a group of patients with eating disorders using a projective family test. The Patient group (anorexia=21, bulimia=16), as well as a healthy Control group, were given a projective family test, the Eating Disorder Inventory-2, as well as Karolinska Scales of Personality. The Patient group expressed more discord within the family picture than the Control group, such as cold and loveless relationships and not feeling validated. The group of patients reporting the most family discord did not show more eating disorder pathology or general psychopathology. They did, however, have higher scores on the Eating Disorder Inventory-2 subscale Maturity Fears, as well as higher values on the Karolinska Scales of Personality subscale Socialization. These results are interpreted within the background of methodological challenges in this area of research.

  16. Plutonium immobilization project development and testing quality assurance program description - February 1999

    International Nuclear Information System (INIS)

    MacLean, L. M.; Ziemba, J.

    1999-01-01

    Lawrence Livermore National Laboratory Immobilization Development and Testing organization (LLNL ID and T) is a Participant in the Plutonium Immobilization Project (PIP). The LLNL D and T has lead responsibilities for form characterization and qualification, ceramic form development, process/equipment development with plutonium, and process systems testing and validation for both conversion and immobilization. This work must be performed in accordance with the graded approach of a Quality Assurance (QA) Program. A QA Program has been developed at LLNL to meet the requirements of the DOE/MD Quality Assurance Requirements. The LLNL QA Program consists of a Quality Assurance Program Description (QAPD) and Quality Implementing Procedures. These documents interface and are a subset of the overall PIP QA Program Documents. The PIP QA Program is described in the PIP ID and T QA Plan, PIP QAPD, and QA Procedures. Other Participant Organizations also must document and describe their PIP compliant QA Programs in a QAPD and implementing procedures. The purpose of this LLNL QAPD is to describe the organization, management processes, QA Controls for Grading, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the adequacy of work

  17. Draft environmental assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-06-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  18. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  19. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    by the practical testing environment. As a result of the changes, a reasonable assumption would be to question the consequences caused by the variations in method procedures. Here, the aim is to highlight the proven or hypothetic consequences of variations of Projective Mapping. Presented variations will include...... instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent......Projective Mapping (Risvik et.al., 1994) and its Napping (Pagès, 2003) variations have become increasingly popular in the sensory field for rapid collection of spontaneous product perceptions. It has been applied in variations which sometimes are caused by the purpose of the analysis and sometimes...

  20. Report on the engineering test of the LBL 30 second neutral beam source for the MFTF-B project

    International Nuclear Information System (INIS)

    Vella, M.C.; Pincosy, P.A.; Hauck, C.A.; Pyle, R.V.

    1984-08-01

    Positive ion based neutral beam development in the US has centered on the long pulse, Advanced Positive Ion Source (APIS). APIS eventually focused on development of 30 second sources for MFTF-B. The Engineering Test was part of competitive testing of the LBL and ORNL long pulse sources carried out for the MFTF-B Project. The test consisted of 500 beam shots with 80 kV, 30 second deuterium, and was carried out on the Neutral Beam Engineering Test Facility (NBETF). This report summarizes the results of LBL testing, in which the LBL APIS demonstrated that it would meet the requirements for MFTF-B 30 second sources. In part as a result of this test, the LBL design was found to be suitable as the baseline for a Common Long Pulse Source design for MFTF-B, TFTR, and Doublet Upgrade

  1. The Effects of Teacher and Teacher-librarian High-end Collaboration on Inquiry-based Project Reports and School Monthly Test Scores of Fifth-grade Students

    Directory of Open Access Journals (Sweden)

    Hai-Hon Chen

    2015-07-01

    Full Text Available The purpose of this study was twofold. The first purpose was to establish the high level collaboration of integrated instruction model between social studies teacher and teacher-librarian. The second purpose was to investigate the effects of high-end collaboration on the individual and groups’ inquiry-based project reports, as well as monthly test scores of fifth-grade students. A quasi-experimental method was adopted, two classes of elementary school fifth graders in Tainan Municipal city, Taiwan were used as samples. Students were randomly assigned to experimental conditions by class. Twenty eight students of the experimental group were taught by the collaboration of social studies teacher and teacher-librarian; while 27 students of the controlled group were taught separately by teacher in didactic teaching method. Inquiry-Based Project Record, Inquiry-Based Project Rubrics, and school monthly test scores were used as instruments for collecting data. A t-test and correlation were used to analyze the data. The results indicate that: (1 High-end collaboration model between social studies teacher and teacher-librarian was established and implemented well in the classroom. (2There was a significant difference between the experimental group and the controlled group in individual and groups’ inquiry-based project reports. Students that were taught by the collaborative teachers got both higher inquiry-based project reports’ scores than those that were taught separately by the teachers. Experimental group’s students got higher school monthly test scores than controlled groups. Suggestions for teachers’ high-end collaboration and future researcher are provided in this paper.

  2. Measuring the quality of clinical audit projects.

    Science.gov (United States)

    Millard, A D

    2000-11-01

    The aim of the study was to develop and pilot a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments assessing the quality of clinical audit projects to form a Likert scale. Audit facilitators based in Scottish health boards and trusts piloted the scale. The participants were known to have over 2 years of experience of supporting clinical audit. The response at first test was 11 of 14 and at the second test 27 of 46. Audit facilitators tested the draft scale by expressing their strength of agreement or disagreement with each statement for three reports. Validity and reliability were assessed by test - re-test, item - total, and total - global indicator correlation. Of the 20 statements, 15 had satisfactory correlation with scale totals. Scale totals had good correlation with global indicators. Test re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  3. Fast breeder project (PSB)

    International Nuclear Information System (INIS)

    1976-07-01

    Activities performed during the 1st quarter of 1976 at or on behalf of the Gesellschaft fuer Kernforschung mbH, Karlsruhe, within the framework of the Fast Breeder Project are given a survey. The following project subdivisions are dealt with: Fuel rod development; materials testing and developments; corrosion studies and coolant analyses; physical experiments; reactor theory; safety of fast breeders; instrumentation and signal processing for core monitoring; effects on the environment; sodium technology tests; thermodynamic and fluid flow tests in gas. (HR) [de

  4. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  5. Flap testing on the rotating test rig in the INDUFLAP project

    DEFF Research Database (Denmark)

    Barlas, Athanasios; Aagaard Madsen, Helge; Enevoldsen, Karen

    Tests of a prototype Controllable Rubber Trailing Edge Flap (CRTEF) are performed on the rotating test rig at the Risø campus of DTU. The general description and objectives are presented, along with an overview of sensors on the setup and the test cases. The post-processing of data is discussed...

  6. IPRT polarized radiative transfer model intercomparison project - Three-dimensional test cases (phase B)

    Science.gov (United States)

    Emde, Claudia; Barlakas, Vasileios; Cornet, Céline; Evans, Frank; Wang, Zhen; Labonotte, Laurent C.; Macke, Andreas; Mayer, Bernhard; Wendisch, Manfred

    2018-04-01

    Initially unpolarized solar radiation becomes polarized by scattering in the Earth's atmosphere. In particular molecular scattering (Rayleigh scattering) polarizes electromagnetic radiation, but also scattering of radiation at aerosols, cloud droplets (Mie scattering) and ice crystals polarizes. Each atmospheric constituent produces a characteristic polarization signal, thus spectro-polarimetric measurements are frequently employed for remote sensing of aerosol and cloud properties. Retrieval algorithms require efficient radiative transfer models. Usually, these apply the plane-parallel approximation (PPA), assuming that the atmosphere consists of horizontally homogeneous layers. This allows to solve the vector radiative transfer equation (VRTE) efficiently. For remote sensing applications, the radiance is considered constant over the instantaneous field-of-view of the instrument and each sensor element is treated independently in plane-parallel approximation, neglecting horizontal radiation transport between adjacent pixels (Independent Pixel Approximation, IPA). In order to estimate the errors due to the IPA approximation, three-dimensional (3D) vector radiative transfer models are required. So far, only a few such models exist. Therefore, the International Polarized Radiative Transfer (IPRT) working group of the International Radiation Commission (IRC) has initiated a model intercomparison project in order to provide benchmark results for polarized radiative transfer. The group has already performed an intercomparison for one-dimensional (1D) multi-layer test cases [phase A, 1]. This paper presents the continuation of the intercomparison project (phase B) for 2D and 3D test cases: a step cloud, a cubic cloud, and a more realistic scenario including a 3D cloud field generated by a Large Eddy Simulation (LES) model and typical background aerosols. The commonly established benchmark results for 3D polarized radiative transfer are available at the IPRT website (http

  7. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  8. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  9. Projective Test Use among School Psychologists: A Survey and Critique

    Science.gov (United States)

    Hojnoski, Robin L.; Morrison, Rhonda; Brown, Melissa; Matthews, William J.

    2006-01-01

    The use of projective techniques by school psychologists has been a point of interest and debate, with a number of survey studies documenting usage. The purpose of this study is to update the status of projective use among school psychologists, with a specific focus on their use in the social emotional assessment of children in schools. In…

  10. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  11. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  12. Digface characterization test plan (remote testing)

    International Nuclear Information System (INIS)

    Croft, K.; Hyde, R.; Allen, S.

    1993-08-01

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements

  13. Testing Object-Oriented Software

    DEFF Research Database (Denmark)

    Caspersen, Michael Edelgaard; Madsen, Ole Lehrmann; Skov, Stefan H.

    The report is a result of an activity within the project Centre for Object Technology (COT), case 2. In case 2 a number of pilot projects have been carried out to test the feasibility of using object technology within embedded software. Some of the pilot projects have resulted in proto-types that......The report is a result of an activity within the project Centre for Object Technology (COT), case 2. In case 2 a number of pilot projects have been carried out to test the feasibility of using object technology within embedded software. Some of the pilot projects have resulted in proto......-types that are currently being developed into production versions. To assure a high quality in the product it was decided to carry out an activ-ity regarding issues in testing OO software. The purpose of this report is to discuss the issues of testing object-oriented software. It is often claimed that testing of OO...... software is radically different form testing traditional software developed using imperative/procedural programming. Other authors claim that there is no difference. In this report we will attempt to give an answer to these questions (or at least initiate a discussion)....

  14. ZigBee test framework

    NARCIS (Netherlands)

    Bui Tat Minh, B.

    2015-01-01

    This project aims to build up a common ZigBee test framework. The common test framework can be used by teams developing devices using ZigBee. The objective is to reuse of the test infrastructure, test xtures as well as to simplify the exchange of test engineers between teams. In this project, we

  15. Analysis of heat and mass transfer in sub-seabed disposal of nuclear waste

    International Nuclear Information System (INIS)

    Hickox, C.E.; Gartling, D.K.; McVey, D.F.; Russo, A.J.; Nuttall, H.E.

    1980-01-01

    A mathematical basis is developed for the prediction of thermal and radionuclide transport in marine sediments. The theory is applied to the study of radioactive waste disposal by emplacement, in specially designed containers, well below the sediment/water interface. Numerical results are obtained for a specified model problem through use of two computer programs designed primarily for the analysis of waste disposal problems. One program (MARIAH) provides descriptions of the temperature and velocity fields induced by the presence of a container of thermally active nuclear waste. A second program (IONMIG), which utilizes the results of the thermal analysis, is used to provide predictions for the migration of four representative radionuclides: 239 Pu, 137 Cs, 129 I, and 99 Tc

  16. Wind power integration in island-based smart grid projects : A comparative study between Jeju Smart Grid Test-bed and Smart Grid Gotland

    OpenAIRE

    Piehl, Hampus

    2014-01-01

    Smart grids seem to be the solution to use energy from renewable and intermittent energy sources in an efficient manner. There are many research projects around the world and two of them are Jeju Smart Grid Test-bed and Smart Grid Gotland. They have in common that they are both island-based projects and connected to the Powergrid on the mainland by HVDC-link. The purpose of this thesis is to compare the two projects and find out what challenges and strategies they have related to wind power i...

  17. Climate Analogues for agricultural impact projection and adaptation – a reliability test

    Directory of Open Access Journals (Sweden)

    Swen P.M. Bos

    2015-10-01

    Full Text Available The climate analogue approach is often considered a valuable tool for climate change impact projection and adaptation planning, especially for complex systems that cannot be modelled reliably. Important examples are smallholder farming systems using agroforestry or other mixed-cropping approaches. For the projected climate at a particular site of interest, the analogue approach identifies locations where the current climate is similar to these projected conditions. By comparing baseline-analogue site pairs, information on climate impacts and opportunities for adaptation can be obtained. However, the climate analogue approach is only meaningful, if climate is a dominant driver of differences between baseline and analogue site pairs. For a smallholder farming setting on Mt. Elgon in Kenya, we tested this requirement by comparing yield potentials of maize and coffee (obtained from the IIASA Global Agro-ecological Zones dataset among 50 close analogue sites for different future climate scenarios and models, and by comparing local ecological knowledge and farm characteristics for one baseline-analogue pair.Yield potentials among the 50 closest analogue locations varied strongly within all climate scenarios, hinting at factors other than climate as major drivers of what the analogue approach might interpret as climate effects. However, on average future climatic conditions seemed more favourable to maize and coffee cultivation than current conditions. The detailed site comparison revealed substantial differences between farms in important characteristics, such as farm size and presence of cash crops, casting doubt on the usefulness of the comparison for climate change analysis. Climatic constraints were similar between sites, so that no apparent lessons for adaptation could be derived. Pests and diseases were also similar, indicating that climate change may not lead to strong changes in biotic constraints at the baseline site in the near future. From

  18. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site

  19. Gallium-cladding compatibility testing plan. Phases 1 and 2: Test plan for gallium corrosion tests. Revision 2

    International Nuclear Information System (INIS)

    Wilson, D.F.; Morris, R.N.

    1998-05-01

    This test plan is a Level-2 document as defined in the Fissile Materials Disposition Program Light-Water-Reactor Mixed-Oxide Fuel Irradiation Test Project Plan. The plan summarizes and updates the projected Phases 1 and 2 Gallium-Cladding compatibility corrosion testing and the following post-test examination. This work will characterize the reactions and changes, if any, in mechanical properties that occur between Zircaloy clad and gallium or gallium oxide in the temperature range 30--700 C

  20. Conceptual Design Report: Nevada Test Site Mixed Waste Disposal Facility Project

    International Nuclear Information System (INIS)

    2009-01-01

    Environmental cleanup of contaminated nuclear weapons manufacturing and test sites generates radioactive waste that must be disposed. Site cleanup activities throughout the U.S. Department of Energy (DOE) complex are projected to continue through 2050. Some of this waste is mixed waste (MW), containing both hazardous and radioactive components. In addition, there is a need for MW disposal from other mission activities. The Waste Management Programmatic Environmental Impact Statement Record of Decision designates the Nevada Test Site (NTS) as a regional MW disposal site. The NTS has a facility that is permitted to dispose of onsite- and offsite-generated MW until November 30, 2010. There is not a DOE waste management facility that is currently permitted to dispose of offsite-generated MW after 2010, jeopardizing the DOE environmental cleanup mission and other MW-generating mission-related activities. A mission needs document (CD-0) has been prepared for a newly permitted MW disposal facility at the NTS that would provide the needed capability to support DOE's environmental cleanup mission and other MW-generating mission-related activities. This report presents a conceptual engineering design for a MW facility that is fully compliant with Resource Conservation and Recovery Act (RCRA) and DOE O 435.1, 'Radioactive Waste Management'. The facility, which will be located within the Area 5 Radioactive Waste Management Site (RWMS) at the NTS, will provide an approximately 20,000-cubic yard waste disposal capacity. The facility will be licensed by the Nevada Division of Environmental Protection (NDEP)

  1. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    International Nuclear Information System (INIS)

    Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

    2007-01-01

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E and E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN)

  2. OECD MCCI project long-term 2-D molten core concrete interaction test design report, Rev. 0. September 30, 2002

    International Nuclear Information System (INIS)

    Farmer, M.T.; Kilsdonk, D.J.; Lomperski, S.; Aeschliman, R.W.; Basu, S.

    2011-01-01

    The Melt Attack and Coolability Experiments (MACE) program at Argonne National Laboratory addressed the issue of the ability of water to cool and thermally stabilize a molten core-concrete interaction when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. As a follow-on program to MACE, The Melt Coolability and Concrete Interaction Experiments (MCCI) project is conducting reactor material experiments and associated analysis to achieve the following two technical objectives: (1) resolve the ex-vessel debris coolability issue through a program that focuses on providing both confirmatory evidence and test data for the coolability mechanisms identified in MACE integral effects tests, and (2) address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. Achievement of these two objectives will demonstrate the efficacy of severe accident management guidelines for existing plants, and provide the technical basis for better containment designs for future plants. In terms of the first program objective, the Small-Scale Water Ingression and Crust Strength (SSWICS) test series has been initiated to provide fundamental information on the ability of water to ingress into cracks and fissures that form in the debris during quench, thereby augmenting the otherwise conduction-limited heat transfer process. A test plan for Melt Eruption Separate Effects Tests (MESET) has also been developed to provide information on the extent of crust growth and melt eruptions as a function of gas sparging rate under well-controlled experiment conditions. In terms of the second program objective, the project Management Board (MB) has approved startup activities required to carry out

  3. Design, Fabrication and Testing of Medium-Beta 650 MHz SRF Cavity Prototypes for Project-X

    International Nuclear Information System (INIS)

    Marhauser, F.; Clemens, W.A.; Henry, J.; Kneisel, P.; Martin, R.; Rimmer, R.A.; Slack, G.; Turlington, L.; Williams, R.S.

    2011-01-01

    A new type of superconducting radio frequency (SRF) cavity shape with a shallow equator dome to reduce electron impact energies for suppressing multipacting barriers has been proposed. The shape is in consideration for the first time in the framework of Project-X to design a potential multi-cell cavity candidate for the medium-beta section of the SRF proton CW linac operating at 650 MHz. Rationales covering the design of the multi-cell cavity, the manufacture, post-processing and high power testing of two single-cell prototypes are presented.

  4. Prediction of Pseudo relative velocity response spectra at Yucca Mountain for underground nuclear explosions conducted in the Pahute Mesa testing area at the Nevada testing site; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, J.S.

    1991-12-01

    The Yucca Mountain Site Characterization Project (YMP), managed by the Office of Geologic Disposal of the Office of Civilian Radioactive Waste Management of the US Department of Energy, is examining the feasibility of siting a repository for commercial, high-level nuclear wastes at Yucca Mountain on and adjacent to the Nevada Test Site (NTS). This work, intended to extend our understanding of the ground motion at Yucca Mountain resulting from testing of nuclear weapons on the NTS, was funded by the Yucca Mountain project and the Military Applications Weapons Test Program. This report summarizes one aspect of the weapons test seismic investigations conducted in FY88. Pseudo relative velocity response spectra (PSRV) have been calculated for a large body of surface ground motions generated by underground nuclear explosions. These spectra have been analyzed and fit using multiple linear regression techniques to develop a credible prediction technique for surface PSRVs. In addition, a technique for estimating downhole PSRVs at specific stations is included. A data summary, data analysis, prediction development, prediction evaluation, software summary and FORTRAN listing of the prediction technique are included in this report.

  5. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Newsom, H.C.

    1999-01-01

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted

  6. An analysis of reliability for photovoltaic systems on the field test project for photovoltaic in Japan

    Energy Technology Data Exchange (ETDEWEB)

    Oozeki, Takashi; Yamada, Takao; Kato, Kazuhiko [National Institute of Advanced Industrial Science and Technology (AIST), Research center for photovoltaic (RCPV), Tsukuba (Japan); Yamamoto, Taiji [New Energy and Industrial Technology Development Organization, MUZA Kawasaki Central Tower, Kanagawa (Japan)

    2008-07-01

    To develop a Photovoltaic (PV) module and cell efficiency are not only important, but also improving PV system performances is the significant technology. The long term reliability is one of the most important in PV systems' performances. In Japan, NEDO (New Energy and Industrial Technology Development Organization) has organized ''Field test (FT) project in Japan'' from FY 1992 up to now. The user of PV systems in the project cooperates for collecting monitoring data and reports the information of maintenance and some failures of PV systems for four years. In this paper, the failures and maintenance information are reported by using MTBF, MTTR, and so on. Moreover, the power conditioner is suspended by some protection or other reason - it is not failure, and the power conditioner can be restarted-which are obtained by PV system user's reports. (orig.)

  7. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  8. Automation of Test Cases for Web Applications : Automation of CRM Test Cases

    OpenAIRE

    Seyoum, Alazar

    2012-01-01

    The main theme of this project was to design a test automation framework for automating web related test cases. Automating test cases designed for testing a web interface provide a means of improving a software development process by shortening the testing phase in the software development life cycle. In this project an existing AutoTester framework and iMacros test automation tools were used. CRM Test Agent was developed to integrate AutoTester to iMacros and to enable the AutoTester,...

  9. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  10. 17th Symposium of NEDO projects. Introducing/spreading project subcommittee; Donyu fukyu jigyo bunkakai. Dai 17kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The results of the following themes are presented in this subcommittee; (1) outline of the new energy introduction promotion department, (2) the project results, and (3) introduction of the examples. For the theme (1), NEDO is supporting the projects for introducing and promoting new energy systems, feasibility studies for introduction of these systems, and field test (FT) projects to accumulate the experiences, e.g., collecting the data by operating these systems under actual loads, development and technology demonstration projects for introduction of new energy systems, and advisory projects for supporting introduction of new energy systems. For the theme (2), those results reported include the results and examples of the FT projects for power generation by photovoltaic cells and wind power generation, results of the FT project for power generation by fuel cells and creation of the FT projects for pioneer high-efficiency energy systems, current status of the environment-friendly energy community projects (heat supply systems), results and examples of the environment- friendly energy community projects (power generation projects), demonstration tests for establishing the distributed power supply systems of the next generation, tests for establishing techniques for, e.g., load-leveling in power generation by photovoltaic cells for residential purposes, results of the project for technology of utilizing unutilized energy, survey on the techniques for power generation by wastes, and advisory projects for supporting introduction of new energy. (NEDO)

  11. In situ testing to determination field-saturated hydraulic conductivity of UMTRA Project disposal cell covers, liners, and foundation areas

    International Nuclear Information System (INIS)

    1994-02-01

    This special study was conducted to prepare a guidance document for selecting in situ hydraulic conductivity (K) tests, comparing in situ testing methods, and evaluating the results of such tests. This report may be used as a practical decision-making tool by the Uranium Mill Tailings Remedial Action (UMTRA) Project staff to determine which testing method will most efficiently achieve the field-saturated K results needed for long-term planning. A detailed section on near-surface test methods discusses each method which may be applicable to characterization of UMTRA disposal cell covers, liners and foundation materials. These potentially applicable test methods include the sealed double-ring infiltrometer (SDRI), the air-entry permeameter (AEP), the guelph permeameter, the two-stage borehole technique (TSB), the pressure infiltrometer, and the disk permeameter. Analytical solutions for these methods are provided, and limitations of these solutions are discussed, and a description of testing equipment design and installation are provided

  12. NASA TEERM Hexavalent Chrome Alternatives Projects

    Science.gov (United States)

    Kessel, Kurt; Rothgeb, Matt

    2011-01-01

    This slide presentation reviews the NASA project to select an alternative to hexavalent chrome in the aerospace industry. Included is a recent historic testing and research that the Agency has performed on (1) the external tank, (2) the shuttle orbiter, (3) the Shuttle Rocket Booster, and (4) the Space Shuttle Main Engine. Other related Technology Evaluation for Environmental Risk Mitigation (TEERM) projects are reviewed. The Phase I process of the project performed testing of alternatives the results are shown in a chart for different coating systems. International collaboration was also reviewed. Phase II involves further testing of pretreatment and primers for 6 and 12 months of exposure to conditions at Launch Pad and the beach. Further test were performed to characterize the life cycle corrosion of the space vehicles. A new task is described as a joint project with the Department of Defense to identify a Hex Chrome Free Coatings for Electronics.

  13. Managing Challenges in a Multi Contractor Project

    Science.gov (United States)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  14. Augmenting SCA project management and automation framework

    Science.gov (United States)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  15. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  16. GUI test automation for Qt application

    OpenAIRE

    Wang, Lei

    2015-01-01

    GUI test automation is a popular and interesting subject in the testing industry. Many companies plan to start test automation projects in order to implement efficient, less expensive software testing. However, there are challenges for the testing team who lack experience performing GUI tests automation. Many GUI test automation projects have ended in failure due to mistakes made during the early stages of the project. The major work of this thesis is to find a solution to the challenges of e...

  17. Coaxial-gun design and testing for the PLX- α Project

    Science.gov (United States)

    Witherspoon, F. Douglas; Brockington, Samuel; Case, Andrew; Cruz, Edward; Luna, Marco; Langendorf, Samuel

    2016-10-01

    We describe the Alpha coaxial gun designed for a 60-gun scaling study of spherically imploding plasma liners as a standoff driver for plasma-jet-driven magneto-inertial fusion (PJMIF). The guns operate over a range of parameters: 0.5-5.0 mg of Ar, Ne, N2, Kr, and Xe; 20-60 km/s; 2 × 1016 cm-3 muzzle density; and up to 7.5 kJ stored energy per gun. Each coaxial gun incorporates a fast dense gas injection and triggering system, a compact low-weight pfn with integral sparkgap switching, and a contoured gap designed to suppress the blow-by instability. The latest design iteration incorporates a faster more robust gas valve, an improved electrode contour, a custom 600- μF, 5-kV pfn, and six inline sparkgap switches operated in parallel. The switch and pfn are mounted directly to the back of the gun and are designed to reduce inductance, cost, and complexity, maximize efficiency and system reliability, and ensure symmetric current flow. We provide a brief overview of the design choices, the projected performance over the parameter ranges mentioned above, and experimental results from testing of the PLX- α coaxial gun. This work supported by the ARPA-E ALPHA Program.

  18. Test Design Project: Studies in Test Adequacy. Annual Report.

    Science.gov (United States)

    Wilcox, Rand R.

    These studies in test adequacy focus on two problems: procedures for estimating reliability, and techniques for identifying ineffective distractors. Fourteen papers are presented on recent advances in measuring achievement (a response to Molenaar); "an extension of the Dirichlet-multinomial model that allows true score and guessing to be…

  19. OECD Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    This is the nineteenth annual Report on the OECD Halden Reactor Project, describing activities at the Project during 1978, the last year of the 1976-1978 Halden Agreement. Work continued in two main fields: test fuel irradiation and fuel research, and computer-based process supervision and control. Project research on water reactor fuel focusses on various aspects of fuel behavior under normal, and off-normal transient conditions. In 1978, participating organisations continued to submit test fuel for irradiation in the Halden boiling heavy-water reactor, in instrumented test assemblies designed and manufactured by the Project. Work included analysis of the impact of fuel design and reactor operating conditions on fuel cladding behavior. Fuel performance modelling included characterization of thermal and mechanical behavior at high burn-up, of fuel failure modes, and improvement of data qualification procedures to reduce and quantify error bands on in-reactor measurements. Instrument development yielded new or improved designs for measuring rod temperature, internal pressure, axial neutron flux shape determination, and for detecting cladding defects. Work on computer-based methods of reactor supervision and control included continued development of a system for predictive core surveillance, and of special mathematical methods for core power distribution control

  20. West Valley Demonstration Project vitrification process equipment Functional and Checkout Testing of Systems (FACTS)

    International Nuclear Information System (INIS)

    Carl, D.E.; Paul, J.; Foran, J.M.; Brooks, R.

    1990-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project was designed to convert stored radioactive waste into a stable glass for disposal in a federal repository. The Functional and Checkout Testing of Systems (FACTS) program was conducted from 1984 to 1989. During this time new equipment and processes were developed, installed, and implemented. Thirty-seven FACTS tests were conducted, and approximately 150,000 kg of glass were made by using nonradioactive materials to simulate the radioactive waste. By contrast, the planned radioactive operation is expected to produce approximately 500,000 kg of glass. The FACTS program demonstrated the effectiveness of equipment and procedures in the vitrification system, and the ability of the VF to produce quality glass on schedule. FACTS testing also provided data to validate the WVNS waste glass qualification method and verify that the product glass would meet federal repository acceptance requirements. The system was built and performed to standards which would have enabled it to be used in radioactive service. As a result, much of the VF tested, such as the civil construction, feed mixing and holding vessels, and the off-gas scrubber, will be converted for radioactive operation. The melter was still in good condition after being at temperature for fifty-eight of the sixty months of FACTS. However, the melter exceeded its recommended design life and will be replaced with a similar melter. Components that were not designed for remote operation and maintenance will be replaced with remote-use items. The FACTS testing was accomplished with no significant worker injury or environmental releases. During the last FACTS run, the VF processes approximated the remote-handling system that will be used in radioactive operations. Following this run the VF was disassembled for conversion to a radioactive process. Functional and checkout testing of new components will be performed prior to radioactive operation

  1. Distributed Wind Competitiveness Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    2018-02-27

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.ufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.

  2. TESTING TREE-CLASSIFIER VARIANTS AND ALTERNATE MODELING METHODOLOGIES IN THE EAST GREAT BASIN MAPPING UNIT OF THE SOUTHWEST REGIONAL GAP ANALYSIS PROJECT (SW REGAP)

    Science.gov (United States)

    We tested two methods for dataset generation and model construction, and three tree-classifier variants to identify the most parsimonious and thematically accurate mapping methodology for the SW ReGAP project. Competing methodologies were tested in the East Great Basin mapping un...

  3. Méthodes projectives et dangerosité

    OpenAIRE

    Mormont, Christian

    1988-01-01

    Discusses the utility and the advantages and limitations of the use of projective methods for predicting dangerous behavior. Specific tests applicable to the prediction of dangerous behavior are examined, including Rosenzweig's Picture Frustration Test, the Thematic Apperception Test (TAT), and the Rorschach Test. La prédiction de la dangerosité au moyen des épreuves projectives pose certains problèmes spécifiques inhérents au type de matériel recueilli et à ses rapports avec le comporteme...

  4. OECD: Halden reactor project

    International Nuclear Information System (INIS)

    1979-01-01

    The work at the Project has continued in the two main fields: test fuel irradiation and fuel research, and computer based process supervision and control. Organizations participating in the Project continue to have their fuel irradiated in the Halden Reactor in instrumented test assemblies designed and manufactured by the Project. The Project's fuel studies continue to focus on specific subjects such as fuel pellet/cladding interaction and heat transfer, fission product release and fuel behavior under loss of coolant conditions. The work on process control and supervision continues in the highly relevant fields of core control and operator-process communication. A system for predictive core control is being developed while special mathematical methods for core power distribution control are being studied. Operator-process communication studies comprise use of computer simulation on colour display as important ingredients, while the work on developing a system for interactive plant disturbance analysis continues

  5. Test report : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2015-05-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  6. Ecotoxicity testing and environmental risk assessment of iron nanomaterials for sub-surface remediation – Recommendations from the FP7 project NanoRem

    DEFF Research Database (Denmark)

    Hjorth, Rune; Coutris, Claire; Nguyen, Nhung

    2017-01-01

    engineered Fe nanomaterials, specifically, Nano-Goethite, Trap-Ox Fe-zeolites, Carbo-Iron® and FerMEG12, developed within the European FP7 project NanoRem for sub-surface remediation towards a test battery consisting of eight ecotoxicity tests on bacteria (V. fisheri, E. coli), algae (P. subcapitata...... milled nZVI (FerMEG12), showed no toxicity in the test battery when tested in concentrations up to 100 mg/L, which is the cutoff for hazard labeling in chemicals regulation in Europe. However it should be noted that Fe nanomaterials proved challenging to test adequately due to their turbidity...

  7. The Predictive Validity of Projective Measures.

    Science.gov (United States)

    Suinn, Richard M.; Oskamp, Stuart

    Written for use by clinical practitioners as well as psychological researchers, this book surveys recent literature (1950-1965) on projective test validity by reviewing and critically evaluating studies which shed light on what may reliably be predicted from projective test results. Two major instruments are covered: the Rorschach and the Thematic…

  8. Sequential Probability Ratio Testing with Power Projective Base Method Improves Decision-Making for BCI

    Science.gov (United States)

    Liu, Rong

    2017-01-01

    Obtaining a fast and reliable decision is an important issue in brain-computer interfaces (BCI), particularly in practical real-time applications such as wheelchair or neuroprosthetic control. In this study, the EEG signals were firstly analyzed with a power projective base method. Then we were applied a decision-making model, the sequential probability ratio testing (SPRT), for single-trial classification of motor imagery movement events. The unique strength of this proposed classification method lies in its accumulative process, which increases the discriminative power as more and more evidence is observed over time. The properties of the method were illustrated on thirteen subjects' recordings from three datasets. Results showed that our proposed power projective method outperformed two benchmark methods for every subject. Moreover, with sequential classifier, the accuracies across subjects were significantly higher than that with nonsequential ones. The average maximum accuracy of the SPRT method was 84.1%, as compared with 82.3% accuracy for the sequential Bayesian (SB) method. The proposed SPRT method provides an explicit relationship between stopping time, thresholds, and error, which is important for balancing the time-accuracy trade-off. These results suggest SPRT would be useful in speeding up decision-making while trading off errors in BCI. PMID:29348781

  9. The HAW project. Test storage of high-level radiation sources in the Asse salt mine. Documentation and assessment of the storage system

    International Nuclear Information System (INIS)

    Mueller, K.; Rothfuchs, T.

    1994-01-01

    The HAW project aimed primarily at studying the interaction between high-level radioactive waste moulds and rock salt as the respository medium. Another priority was the prototype development and testing of a technical system for the emplacement of high-level radioactive moulds in deep storage boreholes. To simulate real high-level radioactive wastes, special high-level radiation sources (Cs-137, Sr-90) were produced in the United States of America under a German-American cooperation contract, for carrying out the tests at the Asse salt mine. The components of the storage system are described, their position and task within the entire handling procedure explained. Questions of radiation protection and accident protection, of functioning and operating reliability, of quality assurance and examination of documents, materials, of manufacture and functioning, and of documentation are dealt with in detail. With a view to the planning of storage techniques for a mine respository, the experience of development and operation is recorded, and recommendation of further developments are given. Problems which arose during work on the HAW project were partly due to test-specific reasons and will not or not in this form occur in a mine respository. It was planned to start the test emplacement in 1987, and it could have been executed in 1993 after appropriate preparation and approval of the storage system by the mining authority and the Hanover TUEV in 1991. In December 1992, however, the Federal Government decided to give up to the project due to the uncertain licensing situation, and to immediately stop all preparatory work. (orig./HP) [de

  10. Thermal load testing of erosion-monitoring beryllium marker tile for the ITER-Like Wall Project at JET

    International Nuclear Information System (INIS)

    Hirai, T.; Linke, J.; Rubel, M.; Coad, J.P.; Likonen, J.; Lungu, C.P.; Matthews, G.F.; Philipps, V.; Wessel, E.

    2008-01-01

    ITER-Like Wall Project has been launched at JET in order to perform a fully integrated test of plasma-facing materials. During the next major shutdown a full metal wall will be installed: tungsten in the divertor and beryllium in the main chamber. Beryllium erosion is one of key issues to be addressed. Special marker tiles have been designed for this purpose. Test coupons of such markers have been manufactured and examined. The performance test under high power deposition was carried in the electron beam facility JUDITH. The results of material characterization before and after high heat flux loads are presented. The samples survived, without macroscopic damage, power loads of up to 4.5 MW/m 2 for 10 s (surface temperature ∼650 deg. C) and 50 cyclic loads at 3.5 MW/m 2 lasting 10 s each (surface temperature ∼600 deg. C)

  11. Project W.A.T.E.R.

    Science.gov (United States)

    EnviroTeach, 1992

    1992-01-01

    Introduces networking projects for studying rivers and water quality. Describes two projects in South Africa (Project W.A.T.E.R and SWAP) associated with the international network, Global Rivers Environmental Education Network. Discusses water test kits and educational material developed through Project W.A.T.E.R. (Water Awareness through…

  12. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  13. TMACS Test Procedure TP002: Trending

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions

  14. Blind test results - measure of incessant progress in personnel monitoring services at Kudankulam Nuclear Power Project

    International Nuclear Information System (INIS)

    Jashi, K.B.; Ashok Kumar, A.; Pandaram, P.

    2018-01-01

    Personnel Monitoring Services (PMS) at Thermoluminescent Dosimeter (TLD) laboratory, Kudankulam Nuclear Power Project (KKNPP) involve monitoring of about 1500 radiation workers of KKNPP for external radiation exposure on monthly basis. Quality assurance in PMS provides an overall estimate of accuracy which depends not only upon the dosimeter quality and reader performance but also on data interpretation, applicable software and the system. Therefore it measures the effectiveness of quality control mechanism. Blind test is an effective tool to check the performance of the processor without their knowledge during routine processing of the service cards

  15. Beginning analog electronics through projects

    CERN Document Server

    Singmin, Andrew

    2001-01-01

    Analog electronics is the simplest way to start a fun, informative, learning program. Beginning Analog Electronics Through Projects, Second Edition was written with the needs of beginning hobbyists and students in mind. This revision of Andrew Singmin's popular Beginning Electronics Through Projects provides practical exercises, building techniques, and ideas for useful electronics projects. Additionally, it features new material on analog and digital electronics, and new projects for troubleshooting test equipment.Published in the tradition of Beginning Electronics Through Projects an

  16. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI

  17. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  18. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  19. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    Science.gov (United States)

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  20. Scaled Vitrification System III (SVS III) Process Development and Laboratory Tests at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Jain, V.; Barnes, S.M.; Bindi, B.G.; Palmer, R.A.

    2000-01-01

    At the West Valley Demonstration Project (WVDP),the Vitrification Facility (VF)is designed to convert the high-level radioactive waste (HLW)stored on the site to a stable glass for disposal at a Department of Energy (DOE)-specified federal repository. The Scaled Vitrification System III (SVS-III)verification tests were conducted between February 1995 and August 1995 as a supplemental means to support the vitrification process flowsheet, but at only one seventh the scale.During these tests,the process flowsheet was refined and optimized. The SVS-III test series was conducted with a focus on confirming the applicability of the Redox Forecasting Model, which was based on the Index of Feed Oxidation (IFO)developed during the Functional and Checkout Testing of Systems (FACTS)and SVS-I tests. Additional goals were to investigate the prototypical feed preparation cycle and test the new target glass composition. Included in this report are the basis and current designs of the major components of the Scale Vitrification System and the results of the SVS-III tests.The major subsystems described are the feed preparation and delivery, melter, and off-gas treatment systems. In addition,the correlation between the melter's operation and its various parameters;which included feed rate,cold cap coverage,oxygen reduction (redox)state of the glass,melter power,plenum temperature,and airlift analysis;were developed

  1. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    Science.gov (United States)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  2. FINAL PROJECT REPORT - EVALUATION AND TESTING OF HTGR REACTOR BUILDING RESPONSE TO DEPRESSURIZATION ACCIDENTS

    Energy Technology Data Exchange (ETDEWEB)

    ALLIANCE LIMITED, NGNP INDUSTRY

    2017-07-25

    This report provides a description of the project, summarizes each phase of the project, and ends with project conclusions. In addition, the report contains a descriptive index of the technical reports generated during the course of the project.

  3. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3

  4. The Esmeralda project

    International Nuclear Information System (INIS)

    Sophy, Y.

    1979-01-01

    This paper discusses the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The design objectives and major features of the project are presented. The need for sodium fire testing on such a scale, results from problems of similitude arising from the extrapolation of previous results to fires liable to occur in large fast neutron reactors such as Super-Phenix. (author)

  5. Test Procedure - pumping system for caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1994-01-01

    This test procedure provides the requirements for sub-system testing and integrated operational testing of the submersible mixer pump and caustic addition equipment by WHC and Kaiser personnel at the Rotating Equipment Shop run-in pit (Bldg. 272E)

  6. Budget-aware random testing with T3: benchmarking at the SBST2016 testing tool contest

    NARCIS (Netherlands)

    Prasetya, S.W.B.

    2016-01-01

    Random testing has the advantage that it is usually fast. An interesting use case is to use it for bulk smoke testing, e.g. to smoke test a whole project. However, on a large project, even with random testing it may still take hours to complete. To optimize this, we have adapted an automated random

  7. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  8. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria

  9. Using Workflow Modeling to Identify Areas to Improve Genetic Test Processes in the University of Maryland Translational Pharmacogenomics Project.

    Science.gov (United States)

    Cutting, Elizabeth M; Overby, Casey L; Banchero, Meghan; Pollin, Toni; Kelemen, Mark; Shuldiner, Alan R; Beitelshees, Amber L

    Delivering genetic test results to clinicians is a complex process. It involves many actors and multiple steps, requiring all of these to work together in order to create an optimal course of treatment for the patient. We used information gained from focus groups in order to illustrate the current process of delivering genetic test results to clinicians. We propose a business process model and notation (BPMN) representation of this process for a Translational Pharmacogenomics Project being implemented at the University of Maryland Medical Center, so that personalized medicine program implementers can identify areas to improve genetic testing processes. We found that the current process could be improved to reduce input errors, better inform and notify clinicians about the implications of certain genetic tests, and make results more easily understood. We demonstrate our use of BPMN to improve this important clinical process for CYP2C19 genetic testing in patients undergoing invasive treatment of coronary heart disease.

  10. Long term test of buffer material at the Aespoe HRL, LOT project. Final report on the A0 test parcel

    International Nuclear Information System (INIS)

    Karnland, Ola; Olsson, Siv; Sanden, Torbjoern; Faelth, Billy; Jansson, Mats; Eriksen, Trygve E.; Svaerdstroem, Kjell; Rosborg, Bo; Muurinen, Arto

    2011-02-01

    In the Swedish repository concept for nuclear waste (KBS-3 concept), the spent nuclear fuel will be stored in copper canisters surrounded by compacted bentonite. The decaying power of the fuel will increase the temperature in the repository which, in combination with the uptake of ground-water, could be expected to produce minor mineralogical changes in the bentonite. The ongoing LOT test series at the Aespoe Hard Rock Laboratory are focused on identifying and quantifying any mineralogical alterations in the bentonite exposed to typical repository-like conditions. Further, buffer-related processes concerning copper corrosion, cation transport, and bacterial survival/activity are studied. In total, the LOT project includes seven test parcels, which contain a central Cu-tube surrounded by cylindrical bentonite blocks to a total diameter of 30 cm as well as temperature, total pressure, water pressure and humidity sensors. In each test parcel, an electrical heater placed inside the copper tube is used to simulate the heat generation from the decaying spent fuel. Three test parcels (S1 to S3) have been exposed to standard KBS-3 conditions (maximum temperature below 100 deg C) and three parcels (A1 to A3) to adverse conditions (maximum temperature below ∼140 deg C). Both the standard and the adverse test series include short term tests (1 to 2 years), medium term tests (> 5 years) and long term tests (> 10 years). The present report concerns an additional short term test, thereby the designation A0, which was exposed to adverse conditions for approximately 1.5 years. Cu-coupons, 134 Cs and 57 Co tracers and specific chemical agents were placed in the bentonite at defined positions. After field exposure, the entire test parcel was released from the rock by overlapping percussion drilling and wire sawing. The parcel was lifted and divided at the test site and the bentonite material was sampled for specified analyses. The main aspects of the various tests and analyses may

  11. Long term test of buffer material at the Aespoe HRL, LOT project. Final report on the A0 test parcel

    Energy Technology Data Exchange (ETDEWEB)

    Karnland, Ola; Olsson, Siv; Sanden, Torbjoern; Faelth, Billy (Clay Technology AB, Lund (Sweden)); Jansson, Mats; Eriksen, Trygve E.; Svaerdstroem, Kjell (KTH Royal Inst. of Technology, Stockholm (Sweden)); Rosborg, Bo (Studsvik AB, Nykoeping (Sweden); Rosborg Consulting, Nykoeping (Sweden)); Muurinen, Arto (VTT, Espoo (Finland))

    2011-02-15

    In the Swedish repository concept for nuclear waste (KBS-3 concept), the spent nuclear fuel will be stored in copper canisters surrounded by compacted bentonite. The decaying power of the fuel will increase the temperature in the repository which, in combination with the uptake of ground-water, could be expected to produce minor mineralogical changes in the bentonite. The ongoing LOT test series at the Aespoe Hard Rock Laboratory are focused on identifying and quantifying any mineralogical alterations in the bentonite exposed to typical repository-like conditions. Further, buffer-related processes concerning copper corrosion, cation transport, and bacterial survival/activity are studied. In total, the LOT project includes seven test parcels, which contain a central Cu-tube surrounded by cylindrical bentonite blocks to a total diameter of 30 cm as well as temperature, total pressure, water pressure and humidity sensors. In each test parcel, an electrical heater placed inside the copper tube is used to simulate the heat generation from the decaying spent fuel. Three test parcels (S1 to S3) have been exposed to standard KBS-3 conditions (maximum temperature below 100 deg C) and three parcels (A1 to A3) to adverse conditions (maximum temperature below approx140 deg C). Both the standard and the adverse test series include short term tests (1 to 2 years), medium term tests (> 5 years) and long term tests (> 10 years). The present report concerns an additional short term test, thereby the designation A0, which was exposed to adverse conditions for approximately 1.5 years. Cu-coupons, 134Cs and 57Co tracers and specific chemical agents were placed in the bentonite at defined positions. After field exposure, the entire test parcel was released from the rock by overlapping percussion drilling and wire sawing. The parcel was lifted and divided at the test site and the bentonite material was sampled for specified analyses. The main aspects of the various tests and analyses

  12. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  13. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  14. An Analysis of Rocket Propulsion Testing Costs

    Science.gov (United States)

    Ramirez-Pagan, Carmen P.; Rahman, Shamim A.

    2009-01-01

    The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to

  15. [''R"--project for statistical computing

    DEFF Research Database (Denmark)

    Dessau, R.B.; Pipper, Christian Bressen

    2008-01-01

    An introduction to the R project for statistical computing (www.R-project.org) is presented. The main topics are: 1. To make the professional community aware of "R" as a potent and free software for graphical and statistical analysis of medical data; 2. Simple well-known statistical tests are fai...... are fairly easy to perform in R, but more complex modelling requires programming skills; 3. R is seen as a tool for teaching statistics and implementing complex modelling of medical data among medical professionals Udgivelsesdato: 2008/1/28......An introduction to the R project for statistical computing (www.R-project.org) is presented. The main topics are: 1. To make the professional community aware of "R" as a potent and free software for graphical and statistical analysis of medical data; 2. Simple well-known statistical tests...

  16. Nevada Test Site Area 25, Radiological Survey and Cleanup Project, 1974-1983 (a revised final report). Revision 1

    International Nuclear Information System (INIS)

    Miller, M.G.

    1984-12-01

    This report describes the radiological survey, decontamination and decommissioning (D and D) of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for beta plus gamma and alpha radioactive contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 9 references, 23 figures

  17. The Revolutionary Vertical Lift Technology (RVLT) Project

    Science.gov (United States)

    Yamauchi, Gloria K.

    2018-01-01

    The Revolutionary Vertical Lift Technology (RVLT) Project is one of six projects in the Advanced Air Vehicles Program (AAVP) of the NASA Aeronautics Research Mission Directorate. The overarching goal of the RVLT Project is to develop and validate tools, technologies, and concepts to overcome key barriers for vertical lift vehicles. The project vision is to enable the next generation of vertical lift vehicles with aggressive goals for efficiency, noise, and emissions, to expand current capabilities and develop new commercial markets. The RVLT Project invests in technologies that support conventional, non-conventional, and emerging vertical-lift aircraft in the very light to heavy vehicle classes. Research areas include acoustic, aeromechanics, drive systems, engines, icing, hybrid-electric systems, impact dynamics, experimental techniques, computational methods, and conceptual design. The project research is executed at NASA Ames, Glenn, and Langley Research Centers; the research extensively leverages partnerships with the US Army, the Federal Aviation Administration, industry, and academia. The primary facilities used by the project for testing of vertical-lift technologies include the 14- by 22-Ft Wind Tunnel, Icing Research Tunnel, National Full-Scale Aerodynamics Complex, 7- by 10-Ft Wind Tunnel, Rotor Test Cell, Landing and Impact Research facility, Compressor Test Facility, Drive System Test Facilities, Transonic Turbine Blade Cascade Facility, Vertical Motion Simulator, Mobile Acoustic Facility, Exterior Effects Synthesis and Simulation Lab, and the NASA Advanced Supercomputing Complex. To learn more about the RVLT Project, please stop by booth #1004 or visit their website at https://www.nasa.gov/aeroresearch/programs/aavp/rvlt.

  18. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 3 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 3/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 40 achievement reports on joint research of a solar energy power generation field test project. The major contents of the achievement reports relate to the solar energy power generation field test project (summarized as manufacture and installation of solar energy power generation systems, summary of solar energy power generation facilities, status of installation of solar cells, peripheral devices, and daily schedule of the construction). The reports describe achievements of the joint research (names and achievements of the joint research, study presentation, lectures, literatures, status of patents, similar research in and cooperation with other research institutions), generalization of the research, and future problems. Locations of the joint research carried out are hospitals, township hospitals, a science hall for youths, study and educational cities, primary schools, middle schools, high schools, universities, senior health centers, a life cooperative association, retails shops, factories, office buildings, joint governmental office buildings, Shinkansen stations, prefectural industrial testing centers, health and welfare centers, FM broadcasting studios, a town operated hall of technologies, prefectural office buildings and training centers. (NEDO)

  19. Fermilab ACP multi-microprocessor project

    International Nuclear Information System (INIS)

    Gaines, I.; Areti, H.; Biel, J.; Bracker, S.; Case, G.; Fischler, M.; Husby, D.; Nash, T.

    1984-08-01

    We report on the status of the Fermilab Advanced Computer Program's project to provide more cost-effective computing engines for the high energy physics community. The project will exploit the cheap, but powerful, commercial microprocessors now available by constructing modular multi-microprocessor systems. A working test bed system as well as plans for the next stages of the project are described

  20. The fracture zone project - final report

    International Nuclear Information System (INIS)

    Andersson, Peter

    1993-09-01

    This report summarizes the work and the experiences gained during the fracture zone project at the Finnsjoen study site. The project is probably the biggest effort, so far, to characterize a major fracture zone in crystalline bedrock. The project was running between 1984-1990 involving a large number of geological, geohydrological, geochemical, and geomechanical investigation. The methods used for identification and characterization are reviewed and discussed in terms of applicability and possible improvements for future investigations. The discussion is exemplified with results from the investigation within the project. Flow and transport properties of the zone determined from hydraulic tests and tracer tests are discussed. A large number of numerical modelling efforts performed within the fracture zone project, the INTRAVAL project, and the SKB91-study are summarized and reviewed. Finally, occurrence of similar zones and the relevance of major low angle fracture zones in connection to the siting of an underground repository is addressed

  1. Groundwater flow simulations in support of the Local Scale Hydrogeological Description developed within the Laxemar Methodology Test Project

    International Nuclear Information System (INIS)

    Follin, Sven; Svensson, Urban

    2002-05-01

    The deduced Site Descriptive Model of the Laxemar area has been parameterised from a hydraulic point of view and subsequently put into practice in terms of a numerical flow model. The intention of the subproject has been to explore the adaptation of a numerical flow model to site-specific surface and borehole data, and to identify potential needs for development and improvement in the planned modelling methodology and tools. The experiences made during this process and the outcome of the simulations have been presented to the methodology test project group in course of the project. The discussion and conclusions made in this particular report concern two issues mainly, (i) the use of numerical simulations as a means of gaining creditability, e.g. discrimination between alternative geological models, and (ii) calibration and conditioning of probabilistic (Monte Carlo) realisations

  2. Special Project Examination in Integrated Science - Ordinary Level.

    Science.gov (United States)

    Wimpenny, David

    A science achievement test for the General Certificate of Education (GCE, England) was developed for students enrolled in the curriculum of the Schools Council Integrated Science Project. This document contains discussions of the testing program and a copy of the 1973 test. After an overview of the curriculum project and issues related to…

  3. Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    International Nuclear Information System (INIS)

    PITNER, A.L.

    2000-01-01

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria

  4. Adoption of projected mortality table for the Slovenian market using the Poisson log-bilinear model to test the minimum standard for valuing life annuities

    Directory of Open Access Journals (Sweden)

    Darko Medved

    2015-01-01

    Full Text Available With the introduction of Solvency II a consistent market approach to the valuation of insurance assets and liabilities is required. For the best estimate of life annuity provisions one should estimate the longevity risk of the insured population in Slovenia. In this paper the current minimum standard in Slovenia for calculating pension annuities is tested using the Lee-Carter model. In particular, the mortality of the Slovenian population is projected using the best fit from the stochastic mortality projections method. The projected mortality statistics are then corrected with the selection effect and compared with the current minimum standard.

  5. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  6. Aeroheating Testing and Predictions for Project Orion CEV at Turbulent Conditions

    Science.gov (United States)

    Hollis, Brian R.; Berger, Karen T.; Horvath, Thomas J.; Coblish, Joseph J.; Norris, Joseph D.; Lillard, Randolph P.; Kirk, Benjamin S.

    2009-01-01

    An investigation of the aeroheating environment of the Project Orion Crew Exploration Vehicle was performed in the Arnold Engineering Development Center Hypervelocity Wind Tunnel No. 9 Mach 8 and Mach 10 nozzles and in the NASA Langley Research Center 20 - Inch Mach 6 Air Tunnel. Heating data were obtained using a thermocouple-instrumented approx.0.035-scale model (0.1778-m/7-inch diameter) of the flight vehicle. Runs were performed in the Tunnel 9 Mach 10 nozzle at free stream unit Reynolds numbers of 1x10(exp 6)/ft to 20x10(exp 6)/ft, in the Tunnel 9 Mach 8 nozzle at free stream unit Reynolds numbers of 8 x 10(exp 6)/ft to 48x10(exp 6)/ft, and in the 20-Inch Mach 6 Air Tunnel at free stream unit Reynolds numbers of 1x10(exp 6)/ft to 7x10(exp 6)/ft. In both facilities, enthalpy levels were low and the test gas (N2 in Tunnel 9 and air in the 20-Inch Mach 6) behaved as a perfect-gas. These test conditions produced laminar, transitional and turbulent data in the Tunnel 9 Mach 10 nozzle, transitional and turbulent data in the Tunnel 9 Mach 8 nozzle, and laminar and transitional data in the 20- Inch Mach 6 Air Tunnel. Laminar and turbulent predictions were generated for all wind tunnel test conditions and comparisons were performed with the experimental data to help define the accuracy of computational method. In general, it was found that both laminar data and predictions, and turbulent data and predictions, agreed to within less than the estimated 12% experimental uncertainty estimate. Laminar heating distributions from all three data sets were shown to correlate well and demonstrated Reynolds numbers independence when expressed in terms of the Stanton number based on adiabatic wall-recovery enthalpy. Transition onset locations on the leeside centerline were determined from the data and correlated in terms of boundary-layer parameters. Finally turbulent heating augmentation ratios were determined for several body-point locations and correlated in terms of the

  7. Recovery efficiency test project, Phase 2 activity report. Volume 2, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1989-02-01

    The Recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency of gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. This volume contains appendices for: (1) supporting material and procedures for ``data frac`` stimulation of zone 6 using nitrogen and nitrogen foam; (2) supporting material and procedures for stimulation no. 1 nitrogen gas frac on zone no. 1; (3) supporting material and procedures for stimulation no. 2 in zone no. 1 using liquid CO{sub 2}; (4) supporting material and procedures for frac no. 3 on zone no.1 using nitrogen foam and proppant; (5) supporting material and procedures for stimulation no. 4 in zones 2--3 and 4 using nitrogen foam and proppant; (6) supporting materials and procedures for stimulation no. 5 in zones 5 and 8; and (7) fracture diagnostics reports and supporting materials.

  8. Integrated Test and Evaluation Flight Test 3 Flight Test Plan

    Science.gov (United States)

    Marston, Michael Lawrence

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and

  9. Simplified pilot module development and testing within the ATLAS PanDA Pilot 2.0 Project

    CERN Document Server

    Drizhuk, Daniil; The ATLAS collaboration; Nilsson, Paul

    2016-01-01

    The Production and Distributed Analysis (PanDA) system has been developed to meet ATLAS production and analysis requirements for a data-driven workload management system capable of operating at the LHC data processing scale. The PanDA pilot is one of the major components in the PanDA system. It runs on a worker node and takes care of setting up the environment, fetching and pushing data to storage, getting jobs from the PanDA server and executing them. The original PanDA Pilot was designed over 10 years ago and has since then grown organically. Large parts of the original pilot code base are now getting old and are difficult to maintain. Incremental changes and refactoring have been pushed to the limit, and the time is now right for a fresh start, informed by a decade of experience, with the PanDA Pilot 2.0 Project. To create a testing environment for module development and automated unit and functional testing for next generation pilot tasks, a simple pilot version was developed. It resembles the basic workf...

  10. Differences on the projective hand test among chronic pain patients reporting three different pain experiences.

    Science.gov (United States)

    Panek, Paul E; Skowronski, John J; Wagner, Edwin E

    2002-10-01

    This study examined personality differences among individuals experiencing 3 different types of pain. The projective Hand Test was administered to 90 individuals who were seeking treatment at a pain clinic in an urban area of the southeast United States. These people were seeking treatment for either arthritis (n = 31), fibromyalgia (n = 29), or migraine headaches (n = 30). A 2 (gender) x 3 (pain group) x Age Group multivariate analysis of variance was conducted using the quantitative Hand Test scoring variables as dependent measures. Results indicated that individuals who were seeking treatment for migraine headaches had a higher production rate of responses involving exhibitionistic displays (EXH) than individuals in the other 2 groups. Individuals who were seeking treatment for fibromyalgia had a higher production rate of responses indicating fear and phobic concerns (FEAR) than individuals in the other 2 groups. Individuals who were seeking treatment for arthritis had a higher production rate of Active (ACT) responses than individuals in the other 2 groups. Possible causes and consequences of these effects are discussed.

  11. Comparison of test protocols for standard room/corner tests

    Science.gov (United States)

    R. H. White; M. A. Dietenberger; H. Tran; O. Grexa; L. Richardson; K. Sumathipala; M. Janssens

    1998-01-01

    As part of international efforts to evaluate alternative reaction-to-fire tests, several series of room/comer tests have been conducted. This paper reviews the overall results of related projects in which different test protocols for standard room/corner tests were used. Differences in the test protocols involved two options for the ignition burner scenario and whether...

  12. 7 CFR 1955.132 - Pilot projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  13. TMACS Test Procedure TP007: System administration

    International Nuclear Information System (INIS)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions

  14. Concentrating Solar Power Projects - Dish/Engine Projects | Concentrating

    Science.gov (United States)

    Solar Power | NREL Dish/Engine Projects Photo of several flat, octagonal panels arranged together to form a dish-shaped structure. The receiver is supported above the panels by an arm-like of the panels. These dish/Stirling units are being tested at Sandia National Laboratories in

  15. Open Compute Project at CERN

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    The Open Compute Project, OCP ( http://www.opencompute.org/), was launched by Facebook in 2011 with the objective of building efficient computing infrastructures at lowest possible cost. The technologies are released as open hardware design, with the goal to develop servers and data centers following the model traditionally associated with open source software projects. We have been following the OCP project for some time and decided to buy two OCP twin servers in 2013 to get some hands-on experience. The servers have been tested and compared with our standard hardware regularly acquired through large tenders. In this presentation we will give some relevant results from this testing and also discuss some of the more important differences that can matter for a larger deployment at CERN. Finally it will outline the details for a possible project for a larger deployment of OCP hardware for production use at CERN.

  16. Scaling the quality of clinical audit projects: a pilot study.

    Science.gov (United States)

    Millard, A D

    1999-06-01

    To pilot the development of a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments, assessing the quality of clinical audit projects, to form a Likert scale. The audit facilitators were based in Scottish health boards and trusts. The participants were audit facilitators known to have over 2 years experience of supporting clinical audit. The response at first test was 11 out of 14 and at the second test it was 27 out of 46. The draft scale was tested by 27 audit facilitators who expressed their strength of agreement or disagreement with each statement for three reports. Validity was assessed by test-re-test, item-total, and total-global indicator correlations. Of the 20 statements, 15 had satisfactory correlations with scale totals. Scale totals had good correlations with global indicators. Test-re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  17. Supporting the Creation and Publication of Reviewed and Tested Teaching Modules through the InTeGrate Project

    Science.gov (United States)

    Bruckner, M. Z.; Birnbaum, S. J.; Bralower, T. J.; Egger, A. E.; Fox, S.; Gosselin, D. C.; Iverson, E. A. R.; Manduca, C. A.; Mcconnell, D. A.; Steer, D. N.; Taber, J. J.

    2016-12-01

    InTeGrate is dedicated to providing robust curricular materials that increase Earth literacy among undergraduate students. As of August 2016, 14 modules that use an interdisciplinary approach to teach about Earth-related sustainability issues across the curriculum have been published, and 19 courses and modules are undergoing final revisions. Materials are designed for undergraduate courses and have been tested in a variety of disciplines including geoscience, engineering, humanities, ethics, and Spanish language courses. The materials were developed, tested, revised, and reviewed using a two-year, highly scaffolded process that involves meeting a series of checkpoints, and is supported by a team of experts who provide guidance and formative feedback throughout the process. A series of webinars also supported teams in the development process. Author teams comprise 3-6 faculty members from at least three different institutions. Authors work collaboratively in a templated webspace designed specifically for creating materials, and representatives from the InTeGrate leadership, assessment, and web teams support each group of authors. This support team provides guidance and feedback on content, pedagogy, and web layout as authors develop materials. Authors attend two face-to-face meetings, one at the beginning of the process and another after materials are piloted in authors' classes. These meetings serve to initially orient authors to the development process, including the rubric that will guide their work, and in making revisions following the piloting phase of the project. Authors report that the meetings also provide professional development experience wherein they learn about pedagogy from each other and team leaders. The bulk of the materials development occurs remotely, with teams meeting regularly via teleconference as they follow the project timeline. All materials undergo review against the Materials Design and Refinement Rubric to ensure they meet project

  18. NedWind 25 Blade Testing at NREL for the European Standards Measurement and Testing Program

    Energy Technology Data Exchange (ETDEWEB)

    Larwood, S.; Musial, W.; Freebury, G.; Beattie, A.G.

    2001-04-19

    In the mid-90s the European community initiated the Standards, Measurements, and Testing (SMT) program to harmonize testing and measurement procedures in several industries. Within the program, a project was carried out called the European Wind Turbine Testing Procedure Development. The second part of that project, called Blade Test Methods and Techniques, included the United States and was devised to help blade-testing laboratories harmonize their testing methods. This report provides the results of those tests conducted by the National Renewable Energy Laboratory.

  19. TMACS Test Procedure TP009: Acromag Driver

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code)

  20. Alignment Methods Developed for the Validation of the Thermal and Mechanical Behaviour of the Two Beam Test Modules for the CLIC Project

    CERN Document Server

    Mainaud Durand, Helene; Sosin, Mateusz; Rude, Vivien

    2014-01-01

    CLIC project will consist of more than 20 000 two meters long modules. A test setup made of three modules is being built at CERN to validate the assembly and integration of all components and technical systems and to validate the short range strategy of pre-alignment. The test setup has been installed in a room equipped with a sophisticated system of ventilation able to reproduce the environmental conditions of the CLIC tunnel. Some of the components have been equipped with electrical heaters to simulate the power dissipation, combined with a water cooling system integrated in the RF components. Using these installations, to have a better understanding of the thermal and mechanical behaviour of a module under different operation modes, machine cycles have been simulated; the misalignment of the components and their supports has been observed. This paper describes the measurements methods developed for such a project and the results obtained.

  1. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  2. Thermal Protection Test Bed Pathfinder Development Project

    Science.gov (United States)

    Snapp, Cooper

    2015-01-01

    In order to increase thermal protection capabilities for future reentry vehicles, a method to obtain relevant test data is required. Although arc jet testing can be used to obtain some data on materials, the best method to obtain these data is to actually expose them to an atmospheric reentry. The overprediction of the Orion EFT-1 flight data is an example of how the ground test to flight traceability is not fully understood. The RED-Data small reentry capsule developed by Terminal Velocity Aerospace is critical to understanding this traceability. In order to begin to utilize this technology, ES3 needs to be ready to build and integrate heat shields onto the RED-Data vehicle. Using a heritage Shuttle tile material for the heat shield will both allow valuable insight into the environment that the RED-Data vehicle can provide and give ES3 the knowledge and capability to build and integrate future heat shields for this vehicle.

  3. Measurements and radiation tests on scintillating fibres for the LHCb SciFi project

    CERN Document Server

    Joram, Christian; Shatalov, Pavel

    2014-01-01

    This note describes a number of measurements and a radiation test performed on the baseline fibre of the LHCb SciFi upgrade project. These include measurements of the optical attenuation length - globally and wavelength resolved -, measurements of the photoelectric yield, and finally the assessment of the impact of proton irradiation on these quantities. The fibres were irradiated at the CERN PS with 24 GeV/c protons up to a fluence of 7•10$^{13}$ p/cm$^2$ equivalent to an ionizing dose of about 22 kGy. Measurements on the fibres, in particular in view of possible recovery effects, are still ongoing and the report is expected to be updated in the coming months. This report is meant as backup document for the LHCb internal SciFi review in February 2013. It had to be produced in a short available time. Missing information will be added and style as well as formatting will be improved in the forthcoming version.

  4. Q-Sync Motors in Commercial Refrigeration. Preliminary Test Results and Projected Benefits

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, Brian A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Becker, Bryan R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    This report provides background information on various fractional-horsepower electric motor technologies, summarizes initial data from a DOE-sponsored Q-Sync motor demonstration project, and extrapolates that data to project the potential economic and environmental benefits resulting from upgrading the current installed base of 9–12 W evaporator fan motors to Q-Sync motors.

  5. Recovery Efficiency Test Project: Phase 1, Activity report

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Wilkins, D.W.; Keltch, B.; Saradji, B.; Salamy, S.P.

    1988-04-01

    This report is the second volume of the Recovery Efficiency Test Phase I Report of Activities. Volume 1 covered selection, well planning, drilling, coring, logging and completion operations. This volume reports on well testing activities, reclamation activities on the drilling site and access roads, and the results of physical and mechanical properties tests on the oriented core material obtained from a horizontal section of the well. 3 refs., 21 figs., 10 tabs.

  6. Uncertainty Analyses for Back Projection Methods

    Science.gov (United States)

    Zeng, H.; Wei, S.; Wu, W.

    2017-12-01

    So far few comprehensive error analyses for back projection methods have been conducted, although it is evident that high frequency seismic waves can be easily affected by earthquake depth, focal mechanisms and the Earth's 3D structures. Here we perform 1D and 3D synthetic tests for two back projection methods, MUltiple SIgnal Classification (MUSIC) (Meng et al., 2011) and Compressive Sensing (CS) (Yao et al., 2011). We generate synthetics for both point sources and finite rupture sources with different depths, focal mechanisms, as well as 1D and 3D structures in the source region. The 3D synthetics are generated through a hybrid scheme of Direct Solution Method and Spectral Element Method. Then we back project the synthetic data using MUSIC and CS. The synthetic tests show that the depth phases can be back projected as artificial sources both in space and time. For instance, for a source depth of 10km, back projection gives a strong signal 8km away from the true source. Such bias increases with depth, e.g., the error of horizontal location could be larger than 20km for a depth of 40km. If the array is located around the nodal direction of direct P-waves the teleseismic P-waves are dominated by the depth phases. Therefore, back projections are actually imaging the reflection points of depth phases more than the rupture front. Besides depth phases, the strong and long lasted coda waves due to 3D effects near trench can lead to additional complexities tested here. The strength contrast of different frequency contents in the rupture models also produces some variations to the back projection results. In the synthetic tests, MUSIC and CS derive consistent results. While MUSIC is more computationally efficient, CS works better for sparse arrays. In summary, our analyses indicate that the impact of various factors mentioned above should be taken into consideration when interpreting back projection images, before we can use them to infer the earthquake rupture physics.

  7. Fabrication and installment of the hard-wired I and C works for the neutral beam injection test stand of the K-STAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun

    2004-12-01

    Instrumentation and Control(I and C) of the neutral beam injection test stand (NBI-TS) for the K-STAR national fusion research project has been underway since the start of the project to answer the diverse requests arising from the various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. Another one to be mentioned is the interlock circuitry. One of the interlock circuits are related to the coolant flow failure. The other is the interlock circuit related to the vacuum failure. All of the above mentioned circuitry now constitutes integral parts for the proper operation of the NBI system; details of those hard-wired I and C work are described in this report

  8. Integrated Test and Evaluation (ITE) Flight Test Series 4

    Science.gov (United States)

    Marston, Michael

    2016-01-01

    The integrated Flight Test 4 (FT4) will gather data for the UAS researchers Sense and Avoid systems (referred to as Detect and Avoid in the RTCA SC 228 ToR) algorithms and pilot displays for candidate UAS systems in a relevant environment. The technical goals of FT4 are to: 1) perform end-to-end traffic encounter test of pilot guidance generated by DAA algorithms; 2) collect data to inform the initial Minimum Operational Performance Standards (MOPS) for Detect and Avoid systems. FT4 objectives and test infrastructure builds from previous UAS project simulations and flight tests. NASA Ames (ARC), NASA Armstrong (AFRC), and NASA Langley (LaRC) Research Centers will share responsibility for conducting the tests, each providing a test lab and critical functionality. UAS-NAS project support and participation on the 2014 flight test of ACAS Xu and DAA Self Separation (SS) significantly contributed to building up infrastructure and procedures for FT3 as well. The DAA Scripted flight test (FT4) will be conducted out of NASA Armstrong over an eight-week period beginning in April 2016.

  9. Important projects are being implemented jointly

    International Nuclear Information System (INIS)

    Medeliene, D.

    1998-01-01

    Full text: Sweden is continuing its support to Lithuania in the field of nuclear safety. The major current projects include the testing of gap between graphite and pressure tube measuring device, the pressure tube investigation of material properties, content of hydrogen, microstructure, etc., ALS Structure verification using non-destructive testing, Conceptual study on Leak Before Break, Management seminars for VATESI, Multimedia System for the Ignalina NPP's Information Center and Waste management projects. Some of the projects are partially financed by Ignalina NPP. Sweden and Norway provide financing for the extremely important and expensive project - Physical protection: perimeter around the plant. Two new EC projects, Continuation of support to VATESI: licensing, inservice and decommissioning, and Phare TSO project to help building up TSO competence in Lithuania are no less important. In the beginning of September a functional exercise was organised with the Ignalina NPP emergency preparedness Information unit. This exercise was the second one of the two to prepare the personnel for the problems they have to solve in communication with public and media in the case of an accident at the Ignalina NPP

  10. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    these objectives should be like. Requirements and effects of the application of project management The goal of the project management methodology is to assist the manager in all of these elements, but also to provide a uniform way of evaluating his performance as an objective comparison of indicators in all projects that are implemented in the system. Project management methodology Efficient business operations and fulfilling the requests of users, or buyers if business is done for the third parties, require modern planning and management of projects using computers and appropriate software. Given that the project management with the help of network models requires frequent and rapid processing of large amount of data, it is obvious that the application of computers in this area is of utmost importance. System of reporting on project implementation To achieve effective monitoring, control and implementation of control actions, it is necessary to organize an effective reporting system that will provide timely and realistic information about the real state of the project, in terms of job performing time, the resources spent and the costs of project implementation. Concept of risk management In any project there are many different risk events by type, the probability of appearance, manner and size of the impact of the project. The process of testing the nature of risk events in the project as well as their potential impact on the outcome of the project and their interdependence are realized through the risk analysis. Conclusion Methodologies of project management surged from these differences, when it became apparent that a unified approach to the problem of project managing does not meet the unique project requirements. Taking into account that in the future projects will become more complex and that the methodology of project management will be required to deal with such projects, a proper selection of methodology within the organization is extremely important.

  11. Collaborative Simulation and Testing of the Superconducting Dipole Prototype Magnet for the FAIR Project

    International Nuclear Information System (INIS)

    Zhu Yinfeng; Zhu Zhe; Wu Weiyue; Xu Houchang

    2012-01-01

    The superconducting dipole prototype magnet of the collector ring for the Facility for Antiproton and Ion Research (FAIR) is an international cooperation project. The collaborative simulation and testing of the developed prototype magnet is presented in this paper. To evaluate the mechanical strength of the coil case during quench, a 3-dimensional (3D) electromagnetic (EM) model was developed based on the solid97 magnetic vector element in the ANSYS commercial software, which includes the air region, coil and yoke. EM analysis was carried out with a peak operating current at 278 A. Then, the solid97 element was transferred into the solid185 element, the coupled analysis was switched from electromagnetic to structural, and the finite element model for the coil case and glass-fiber reinforced composite (G10) spacers was established by the ANSYS Parametric Design Language based on the 3D model from the CATIA V5 software. However, to simulate the friction characteristics inside the coil case, the conta173 surface-to-surface contact element was established. The results for the coil case and G10 spacers show that they are safe and have sufficient strength, on the basis of testing in discharge and quench scenarios. (fusion engineering)

  12. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  13. Massive hydraulic fracturing gas stimulation project

    International Nuclear Information System (INIS)

    Appledorn, C.R.; Mann, R.L.

    1977-01-01

    The Rio Blanco Massive Hydraulic Fracturing Project was fielded in 1974 as a joint Industry/ERDA demonstration to test the relative formations that were stimulated by the Rio Blanco Nuclear fracturing experiment. The project is a companion effort to and a continuation of the preceding nuclear stimulation project, which took place in May 1973. 8 figures

  14. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  15. In vitro screening of environmental chemicals for targeted testing prioritization: the ToxCast project.

    Science.gov (United States)

    Judson, Richard S; Houck, Keith A; Kavlock, Robert J; Knudsen, Thomas B; Martin, Matthew T; Mortensen, Holly M; Reif, David M; Rotroff, Daniel M; Shah, Imran; Richard, Ann M; Dix, David J

    2010-04-01

    Chemical toxicity testing is being transformed by advances in biology and computer modeling, concerns over animal use, and the thousands of environmental chemicals lacking toxicity data. The U.S. Environmental Protection Agency's ToxCast program aims to address these concerns by screening and prioritizing chemicals for potential human toxicity using in vitro assays and in silico approaches. This project aims to evaluate the use of in vitro assays for understanding the types of molecular and pathway perturbations caused by environmental chemicals and to build initial prioritization models of in vivo toxicity. We tested 309 mostly pesticide active chemicals in 467 assays across nine technologies, including high-throughput cell-free assays and cell-based assays, in multiple human primary cells and cell lines plus rat primary hepatocytes. Both individual and composite scores for effects on genes and pathways were analyzed. Chemicals displayed a broad spectrum of activity at the molecular and pathway levels. We saw many expected interactions, including endocrine and xenobiotic metabolism enzyme activity. Chemicals ranged in promiscuity across pathways, from no activity to affecting dozens of pathways. We found a statistically significant inverse association between the number of pathways perturbed by a chemical at low in vitro concentrations and the lowest in vivo dose at which a chemical causes toxicity. We also found associations between a small set of in vitro assays and rodent liver lesion formation. This approach promises to provide meaningful data on the thousands of untested environmental chemicals and to guide targeted testing of environmental contaminants.

  16. Virtual Machine in Automation Projects

    OpenAIRE

    Xing, Xiaoyuan

    2010-01-01

    Virtual machine, as an engineering tool, has recently been introduced into automation projects in Tetra Pak Processing System AB. The goal of this paper is to examine how to better utilize virtual machine for the automation projects. This paper designs different project scenarios using virtual machine. It analyzes installability, performance and stability of virtual machine from the test results. Technical solutions concerning virtual machine are discussed such as the conversion with physical...

  17. A pilot Tuning Project-based national study on recently graduated medical students? self-assessment of competences - the TEST study

    OpenAIRE

    Grilo Diogo, Pedro; Barbosa, Joselina; Am?lia Ferreira, Maria

    2015-01-01

    Background The Tuning Project is an initiative funded by the European Commission that developed core competences for primary medical degrees in Europe. Students' grouped self-assessments are used for program evaluation and improvement of curricula. The TEST study aimed to assess how do Portuguese medical graduates self-assess their acquisition of core competences and experiences of contact with patients in core settings according to the Tuning framework. Methods Translation of the Tuning's co...

  18. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 2 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 2/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 26 achievement reports on joint research of a solar energy power generation field test project. The major contents of the achievement reports relate to the solar energy power generation field test project (summarized as manufacture and installation of solar energy power generation systems, summary of solar energy power generation facilities, peripheral devices, and daily schedule of the construction). The reports describe achievements of the joint research (names and achievements of the joint research, study presentation, lectures, literatures, status of patents, similar research in and cooperation with other research institutions), generalization of the research, and future problems. Locations of the joint research carried out are libraries, kindergartens, health and welfare centers, children's culture centers, general traffic centers, primary and middle schools, river water purifying facilities, credit banks, manufactories, retail shops at car parking areas, office buildings, hospitals, joint prefectural office buildings, municipal health centers, and prefectural general power generation control stations. (NEDO)

  19. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  20. The ALPHA project: A progress report

    International Nuclear Information System (INIS)

    Yadigaroglu, G.

    1995-01-01

    A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of passive Advanced Light Water Reactors. In its present phase, the project is directed to the investigation of the Simplified Boiling Water Reactor (SBWR) Passive Containment Cooling system. The project includes separate-effects tests of containment phenomena (the LINX program). The effects of aerosols that may result from hypothetical severe accidents are also considered (the AIDA program). The construction and commissioning of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA is complete and the first series of tests are underway. Scaling studies have guided their design. Several small-scale experiments and studies have already produced valuable results

  1. Final report on the proficiency test on the determination of total arsenic concentration in water TC Project BGD/08/018

    International Nuclear Information System (INIS)

    Shakhashiro, A.; Trinkl, A.; Rossbach, M.; Benesch, T.; Campbell, M.; Sansone, U.; Will, K.; Schorn, R.; Toervenyi, A.

    2005-02-01

    A proficiency test on the determination of arsenic in drinking water was organised within the frame of the TC project BGD/8/018 to evaluate the analytical performance of laboratories in Bangladesh. This report summarises the performance evaluation of the participating laboratories. Analytical data evaluation showed that 61% of data obtained a 'Passed' final score for both the accuracy and precision criteria applied to this exercise. (author)

  2. Q-Thruster Breadboard Campaign Project

    Science.gov (United States)

    White, Harold

    2014-01-01

    Dr. Harold "Sonny" White has developed the physics theory basis for utilizing the quantum vacuum to produce thrust. The engineering implementation of the theory is known as Q-thrusters. During FY13, three test campaigns were conducted that conclusively demonstrated tangible evidence of Q-thruster physics with measurable thrust bringing the TRL up from TRL 2 to early TRL 3. This project will continue with the development of the technology to a breadboard level by leveraging the most recent NASA/industry test hardware. This project will replace the manual tuning process used in the 2013 test campaign with an automated Radio Frequency (RF) Phase Lock Loop system (precursor to flight-like implementation), and will redesign the signal ports to minimize RF leakage (improves efficiency). This project will build on the 2013 test campaign using the above improvements on the test implementation to get ready for subsequent Independent Verification and Validation testing at Glenn Research Center (GRC) and Jet Propulsion Laboratory (JPL) in FY 2015. Q-thruster technology has a much higher thrust to power than current forms of electric propulsion (7x Hall thrusters), and can significantly reduce the total power required for either Solar Electric Propulsion (SEP) or Nuclear Electric Propulsion (NEP). Also, due to the high thrust and high specific impulse, Q-thruster technology will greatly relax the specific mass requirements for in-space nuclear reactor systems. Q-thrusters can reduce transit times for a power-constrained architecture.

  3. Galileo battery testing and the impact of test automation

    Science.gov (United States)

    Pertuch, W. T.; Dils, C. T.

    1985-01-01

    Test complexity, changes of test specifications, and the demand for tight control of tests led to the development of automated testing used for Galileo and other projects. The use of standardized interfacing, i.e., IEEE-488, with desktop computers and test instruments, resulted in greater reliability, repeatability, and accuracy of both control and data reporting. Increased flexibility of test programming has reduced costs by permitting a wide spectrum of test requirements at one station rather than many stations.

  4. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network of Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasizes the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting the NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper

  5. The final focus test beam project

    International Nuclear Information System (INIS)

    Burke, D.

    1991-05-01

    An overview is given of the Final Focus Test Beam (FFTB) that is being constructed as a prototype final focus system for a future electron-positron linear collider. This beam line will use as input the 50 GeV electron beam from the SLC linac, and is designed to reduce the transverse dimensions of the beam spot at the focal point to 1 μm. 5 refs., 2 figs., 1 tab

  6. Post-test investigations of the FPT 0 test of the Phebus FP project

    International Nuclear Information System (INIS)

    Goetzmann, O.

    1995-01-01

    An account is given of the first test of the Phebus fission product experimental series FPT. This test, performed in Dec. 1993, was terminated when the temperature in the thermal insulation shroud attained the maximum value permitted by the safety authorities. (orig.)

  7. Vitrification facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project's vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project's background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing

  8. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    International Nuclear Information System (INIS)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository

  9. Summary of ground motion prediction results for Nevada Test Site underground nuclear explosions related to the Yucca Mountain project

    Energy Technology Data Exchange (ETDEWEB)

    Walck, M.C.

    1996-10-01

    This report summarizes available data on ground motions from underground nuclear explosions recorded on and near the Nevada Test Site, with emphasis on the ground motions recorded at stations on Yucca Mountain, the site of a potential high-level radioactive waste repository. Sandia National Laboratories, through the Weapons Test Seismic Investigations project, collected and analyzed ground motion data from NTS explosions over a 14-year period, from 1977 through 1990. By combining these data with available data from earlier, larger explosions, prediction equations for several ground motion parameters have been developed for the Test Site area for underground nuclear explosion sources. Also presented are available analyses of the relationship between surface and downhole motions and spectra and relevant crustal velocity structure information for Yucca Mountain derived from the explosion data. The data and associated analyses demonstrate that ground motions at Yucca Mountain from nuclear tests have been at levels lower than would be expected from moderate to large earthquakes in the region; thus nuclear explosions, while located relatively close, would not control seismic design criteria for the potential repository.

  10. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2008-01-01

    in the course of the project, when there is neither time nor financial possibilities for solving the problems. The objective of the WPU project is to develop new methods for usability engineering in the development of web portals and to test these methods in companies that develop modern web portals. The result......The Web Portal Usability (WPU) project focuses on usability in the development of modern web portals. Web portals are a key part of software development. They are created to provide a group of users with access to a collection of internet services. State-of-the-art methods for usability engineering...... is a catalogue of methods that support usability engineering in web portal development, combined with guidelines for use, training programmes and documented experience from deployment and use of the methods. The WPU project is a collaborative effort between researchers from Aalborg University, Department...

  11. Development of methodology for alternative testing strategies for the assessment of the toxicological profile of nanoparticles used in medical diagnostics. NanoTEST - EC FP7 project

    International Nuclear Information System (INIS)

    Dusinska, Maria; Fjellsbo, Lise Maria; Heimstad, Eldbjorg; Harju, Mikael; Bartonova, Alena; Tran, Lang; Juillerat-Jeanneret, Lucienne; Halamoda, Blanka; Marano, Francelyne; Boland, Sonja; Saunders, Margaret; Cartwright, Laura; Carreira, Sara; Thawley, Susan; Whelan, Maurice; Klein, Christoph; Housiadas, Christos; Volkovova, Katarina; Tulinska, Jana; Beno, Milan

    2009-01-01

    Nanoparticles (NPs) have unique, potentially beneficial properties, but their possible impact on human health is still not known. The area of nanomedicine brings humans into direct contact with NPs and it is essential for both public confidence and the nanotech companies that appropriate risk assessments are undertaken in relation to health and safety. There is a pressing need to understand how engineered NPs can interact with the human body following exposure. The FP7 project NanoTEST (www.nanotest-fp7.eu) addresses these requirements in relation to the toxicological profile of NPs used in medical diagnostics.

  12. Test Plan: WIPP bin-scale CH TRU waste tests

    International Nuclear Information System (INIS)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs

  13. The HADES demonstration and pilot project

    International Nuclear Information System (INIS)

    Bruyn, D.de; Meynendonckx, P.; Neerdael, B.; Noynaert, L.; Voet, M.; Volckaert, G.; Bonne, A.

    1988-01-01

    This report deals with the activities of SCK/CEN and its subcontractors performed during the years 1986-87 in the framework of the HADES demonstration and pilot project, which is carried out in the geological Boom clay formation underlying the nuclear research establishment at Mol. This demonstration and pilot project is sponsored by the Commission of the European Communities under contract number Fl1W-004 B (B) in the framework of Part B of the CEC programme on radioactive waste management and disposal. The actions undertaken and reported here deal essentially with design and engineering activities in preparation for the construction of a test drift and of a mine-by-test directly related to this construction test and of a combined irradiation/heating test to be performed later on in this test drift. A time schedule for the various tests planned to be made in the test drift has also been worked out taking into account time and spatial dependencies

  14. Presentation of the Gaseifamaz Project and tests results in the gasification system of the 20 Kw imported from the Indian Institute of Science - IISC; Apresentacao do projeto Gaseifamaz e dos testes no sistema de gaseificacao de 20 Kw importado do Indian Institute of Science - IISC

    Energy Technology Data Exchange (ETDEWEB)

    Coelho, Suani T.; Velazquez, Silvia M.S.G.; Martins, Osvaldo S.; Santos, Sandra M.A. [Centro Nacional de Referencia em Biomassa (CENBIO), Sao Paulo, SP (Brazil); Ushima, Ademar H. [Instituto de Pesquisas Tecnologicas (IPT), Sao Paulo, SP (Brazil)

    2004-07-01

    The project 'Comparison Among Existing Technologies of Biomass Gasification', accord FINEP/CT-ENERG 23.01.0695.00, is a partnership between CENBIO - The Brazilian Reference Centre on Biomass, BUN - Biomass Users Network of Brazil, IPT - Technology Research Institute and UA - Amazon University. The main aim of the project is to test the Indian biomass gasification technology, imported from the Indian Institute of Science - IISc; in order to provide electric energy in a sustainable way to isolated communities in the North Region, offering an alternative to replace fossil fuel. The project aims, as well, to capacitate people for maintenance and operation of this technology, thus utilizing the knowledge gained to improve the national equipment according to tests that were under taken at IPT - Technology Research Institute. The project intends to evaluate the operation conditions of the gasification system: gas cleaning, electric energy generation and to transfer the technology to Brazil, not only collaborating whit the institutions that already worked in this area, but also allowing the formation of human resources in the Brazilian North region. Besides, once developed an adequate operation and maintenance system at IPT we will be able to use it in another isolated community. This paper objective is to present the GASEIFAMAZ project and the tests results in the gasification system. (author)

  15. The Heartfile Lodhran CVD prevention project--end of project evaluation.

    Science.gov (United States)

    Nishtar, Sania; Badar, Asma; Kamal, Mohammad Umer; Iqbal, Azhar; Bajwa, Rashid; Shah, Tauqeer; Larik, Zahid; Karim, Fazle; Mehmood, Mahmood ul Hassan; Jehangir, Haroon; Azam, Syed Iqbal; Mirza, Yasir Abbas; Khan, Shahzad Ali; Qayyum, Aamra; Aqeel, Fauzia; Bakir, Abdul; Rahim, Ejaz

    2007-01-01

    Mainstream preventive interventions often fail to reach poor populations with a high risk of cardiovascular diseases (CVDs) in Pakistan. A community-based CVD primary prevention project aimed at developing approaches to reduce risk factors in such populations was established by Heartfile in collaboration with the National Rural Support Program in the district of Lodhran. The project implemented a range of activities integrated with existing social and health service mechanisms during a three year intervention period 2000/01-03/04. These were targeted in 4 key settings: community health education, mass media interventions, training of health professionals and health education through Lady Health Workers. The project received support from the Department for International Development, U.K. At the community level, a pre-test-post-test quasi-experimental design was used for examining project outcomes related to the community component of the intervention. Pre and post-intervention (training) evaluations were conducted involving all health care providers in randomly selected workshops in order to determine baseline levels of knowledge and the impact of training on knowledge level. In order to assess practices of physician and non-physician health care providers patient interviews, with control comparisons were conducted at each health care facility. Significant positive changes were observed in knowledge levels at a community level in the district of intervention compared with baseline knowledge levels particularly in relation to a heart healthy diet, beneficial level of physical activity, the causes of high blood pressure and heart attack and the effects of high blood pressure and active and passive smoking on health. Significant changes in behaviors at a practice level were not shown in the district of intervention. However the project played a critical role in spurring national action for the prevention and control of non-communicable diseases and introducing

  16. Halden Reactor Project activities, achievements and international collaboration

    International Nuclear Information System (INIS)

    Wiesenack, W.

    2003-01-01

    This paper concentrates on the Halden Project research programme related to fuel testing. An overview of ongoing tests on WWER fuel performance is also included. The ongoing and planned experiments containing WWER-related fuels and materials - Irradiation of Standard and Modified WWER Fuel (IFA-503) and Corrosion Testing of Different Cladding Alloys (IFA-638) - are presented. The future experiments involving WWER fuel and cladding types foreseen in of the Halden Reactor Project programme are given

  17. Hydrothermal Testing of K Basin Sludge and N Reactor Fuel at Sludge Treatment Project Operating Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Thornton, Brenda M.

    2007-03-30

    The Sludge Treatment Project (STP), managed for the U. S. DOE by Fluor Hanford (FH), was created to design and operate a process to eliminate uranium metal from K Basin sludge prior to packaging for Waste Isolation Pilot Plant (WIPP). The STP process uses high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. Under nominal process conditions, the sludge will be heated in pressurized water at 185°C for as long as 72 hours to assure the complete reaction (corrosion) of up to 0.25-inch diameter uranium metal pieces. Under contract to FH, the Pacific Northwest National Laboratory (PNNL) conducted bench-scale testing of the STP hydrothermal process in November and December 2006. Five tests (~50 ml each) were conducted in sealed, un-agitated reaction vessels under the hydrothermal conditions (e.g., 7 to 72 h at 185°C) of the STP corrosion process using radioactive sludge samples collected from the K East Basin and particles/coupons of N Reactor fuel also taken from the K Basins. The tests were designed to evaluate and understand the chemical changes that may be occurring and the effects that any changes would have on sludge rheological properties. The tests were not designed to evaluate engineering aspects of the process. The hydrothermal treatment affected the chemical and physical properties of the sludge. In each test, significant uranium compound phase changes were identified, resulting from dehydration and chemical reduction reactions. Physical properties of the sludge were significantly altered from their initial, as-settled sludge values, including, shear strength, settled density, weight percent water, and gas retention.

  18. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  19. [Spanish normative studies in a young adult population (NEURONORMA young adults Project): norms for the verbal span, visuospatial span, Letter-Number Sequencing, Trail Making Test and Symbol Digit Modalities Test].

    Science.gov (United States)

    Tamayo, F; Casals-Coll, M; Sánchez-Benavides, G; Quintana, M; Manero, R M; Rognoni, T; Calvo, L; Palomo, R; Aranciva, F; Peña-Casanova, J

    2012-01-01

    Verbal and visuospatial span, Letter-Number Sequencing, Trail Making Test, and Symbol Digit Modalities Test are frequently used in clinical practice to assess attention, executive functions and memory. In the present study, as part of the Spanish normative studies of NEURONORMA young adults Project, normative data adjusted by age and education are provided for digits, Corsi Block-Tapping Task, Letter-Number Sequencing, Trail Making Test, and Symbol Digit Modalities Test. The sample consisted of 179 participants from 18 to 49 years old, who were cognitively normal. Tables to convert raw scores to scaled scores are provided. Age and education adjusted scores are provided by applying linear regressions. Education affected scores in most of the attention tests; age was found to be related to the visuospatial span and to speed of visuomotor tracking, and there was no relationship as regards sex. The data obtained will be useful in the clinical evaluation of young Spanish adults. Copyright © 2011 Sociedad Española de Neurología. Published by Elsevier Espana. All rights reserved.

  20. Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Nigg, David W. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2013-09-01

    Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance, and to some extent, experiment management, are inconsistent with the state of modern nuclear engineering practice, and are difficult, if not impossible, to verify and validate (V&V) according to modern standards. Furthermore, the legacy staff knowledge required for effective application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In late 2009, the Idaho National Laboratory (INL) initiated a focused effort, the ATR Core Modeling Update Project, to address this situation through the introduction of modern high-fidelity computational software and protocols. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF).

  1. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  2. Faith's problem on R-projectivity is undecidable

    OpenAIRE

    Trlifaj, Jan

    2017-01-01

    In \\cite{F}, Faith asked for what rings $R$ does the Dual Baer Criterion hold in Mod-$R$, that is, when does $R$-projectivity imply projectivity for all right $R$-modules? Such rings $R$ were called right testing. Sandomierski proved that if $R$ is right perfect, then $R$ is right testing. Puninski et al.\\ \\cite{AIPY} have recently shown for a number of non-right perfect rings that they are not right testing, and noticed that \\cite{T2} proved consistency with ZFC of the statement {\\lq}each ri...

  3. Testing power-law cross-correlations: Rescaled covariance test

    Czech Academy of Sciences Publication Activity Database

    Krištoufek, Ladislav

    2013-01-01

    Roč. 86, č. 10 (2013), 418-1-418-15 ISSN 1434-6028 R&D Projects: GA ČR GA402/09/0965 Institutional support: RVO:67985556 Keywords : power-law cross-correlations * testing * long-term memory Subject RIV: AH - Economics Impact factor: 1.463, year: 2013 http://library.utia.cas.cz/separaty/2013/E/kristoufek-testing power-law cross-correlations rescaled covariance test.pdf

  4. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network for Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasises the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper. (author). 2 refs, 6 figs

  5. Electrolysis activities at FCH Test Center

    DEFF Research Database (Denmark)

    Ravn Nielsen, Eva; Nygaard, Frederik Berg

    FCH Test Center for fuel cell and hydrogen technologies was established in 2010 at Risø DTU in Denmark. Today, the test center is part of DTU Energy Conversion. The center gives industry access to advanced testing and demonstration of components and systems. A number of national projects and EU...... projects regarding water electrolysis involve FCH Test Center as a partner. This presentation gives an overview of the activities....

  6. A recent Cleanroom success story: The Redwing project

    Science.gov (United States)

    Hausler, Philip A.

    1992-12-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  7. System design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.; Pounds, T.S.; Smith, S.O.

    1994-01-01

    This document describes the hardware subsystems of the data acquisition and control system (DACS) used in mitigation tests conducted on waste tank SY-101 at the Hanford Nuclear Reservation. The system was designed and implemented by Los Alamos National Laboratory (LANL) and supplied to Westinghouse Hanford Company (WHC). The mitigation testing uses a pump immersed in the waste tank, directed at certain angles and operated at different speeds and time durations. The SY-101 tank has experienced recurrent periodic gas releases of hydrogen, nitrous oxide, ammonia, and (recently discovered) methane. The hydrogen gas represents a danger, as some of the releases are in amounts above the lower flammability limit (LFL). These large gas releases must be mitigated. Several instruments have been added to the tank to monitor the gas compositions, the tank level, the tank temperature, and other parameters. A mixer pump has been developed to stir the tank waste to cause the gases to be released at a slow rate. It is the function of the DACS to monitor those instruments and to control the mixer pump in a safe manner. During FY93 and FY94 the mixer pump was installed with associated testing operations support equipment and a mitigation test project plan was implemented. These activities successfully demonstrated the mixer pump's ability to mitigate the SY-101 tank hydrogen gas hazard

  8. Manufacturing Methods and Technology Project Summary Reports

    Science.gov (United States)

    1984-12-01

    Powder ME-16 Type Recoil Mechanism Testing Machine (Powder Gymnasticator ) Projects 677, 78 7814 - Synthetic Quenchants for ME-18 Heat Treating Weapon...were deemed most urgent. These two were the prime candidates for the GEPTTA. Figure I is an artist depiction of the General Purpose Transportability...REPORT (RCS DRCMT-302) MMT Project 677 7753 titled "Noise Suppressor for Powder Type Recoil Mecha- nism Testing Machine (Powder Gymnasticator )" was

  9. NASA-DoD Lead-Free Electronics Project

    Science.gov (United States)

    Kessel, Kurt

    2010-01-01

    This slide presentation reviews the current state of the lead-free electronics project. It characterizes the test articles, which were built with lead-free solder and lead-free component finishes. The tests performed and reported on are: thermal cycling, combine environments testing, mechanical shock testing, vibration testing and drop testing.

  10. An Application Example Analysis of Quality Assurance Program for STELLA(Sodium Integral Effect Test Loop for Safety Simulation and Assessment) Project

    International Nuclear Information System (INIS)

    Jung, Minhwan; Gam, Dayoung; Eoh, Jae-Hyuk; Jeong, Ji-Young

    2015-01-01

    KAERI has been conducting various basic R and D activities in the field of nuclear technology. In addition, KAERI is now participating in the Generation IV International Forum (GIF), preparing for the development of key technologies for Generation IV nuclear energy system, including Sodium cooled Fast Reactor (SFR) development. All of the key technologies for SFR development need an appropriate level of QA activities to achieve the GIF safety and performance objectives. Therefore, QA activities have been conducted as an essential part of the national SFR project. As a result, QAM (Quality Assurance Manual) and QAP (Quality Assurance Procedures) have been developed for the SFR project, which are based on ASME NQA-1, KEPIC QAP and the GIF Quality Management System Guidelines. In this work, the introduction background and application examples of the QA program for the STELLA project were investigated. Application of the QA for the STELLA project has great significance because the QA has been mainly applied for the nuclear power plant area in operation, which helps ensure the reliability of the test data and completeness of the research performance. Nevertheless, developing more appropriate QA procedures remains a major task because some parts of them are not applicable to the Na-experiment

  11. An Application Example Analysis of Quality Assurance Program for STELLA(Sodium Integral Effect Test Loop for Safety Simulation and Assessment) Project

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Minhwan; Gam, Dayoung; Eoh, Jae-Hyuk; Jeong, Ji-Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    KAERI has been conducting various basic R and D activities in the field of nuclear technology. In addition, KAERI is now participating in the Generation IV International Forum (GIF), preparing for the development of key technologies for Generation IV nuclear energy system, including Sodium cooled Fast Reactor (SFR) development. All of the key technologies for SFR development need an appropriate level of QA activities to achieve the GIF safety and performance objectives. Therefore, QA activities have been conducted as an essential part of the national SFR project. As a result, QAM (Quality Assurance Manual) and QAP (Quality Assurance Procedures) have been developed for the SFR project, which are based on ASME NQA-1, KEPIC QAP and the GIF Quality Management System Guidelines. In this work, the introduction background and application examples of the QA program for the STELLA project were investigated. Application of the QA for the STELLA project has great significance because the QA has been mainly applied for the nuclear power plant area in operation, which helps ensure the reliability of the test data and completeness of the research performance. Nevertheless, developing more appropriate QA procedures remains a major task because some parts of them are not applicable to the Na-experiment.

  12. Duration Test Report for the SWIFT Wind Turbine

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza, I.; Hur, J.

    2013-01-01

    This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Duration testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

  13. Auditory tests for characterizing individual hearing deficits: The BEAR test battery

    DEFF Research Database (Denmark)

    Sanchez Lopez, Raul; Fereczkowski, Michal; Bianchi, Federica

    deficits can be complex. Therefore, one aim of the BEAR project is to design a hearing test battery for classification of listeners into a small number of auditory profiles. If successful, this BEAR test battery may be refined and reduced to form the basis for improved profile-based hearing-aid fitting......BACKGROUND The Better hEAring Rehabilitation (BEAR) project seeks to develop and assess new clinically feasible strategies for individualized hearing-loss diagnosis and hearing-aid fitting. The aim is to improve current clinical practice, where the fitting process relies on the pure-tone audiogram...... protocols. METHOD Based on the reanalysis of existing auditory profiling data and on criteria of their feasibility, time efficiency, and evidence from the literature, eleven potential tests for inclusion in a clinical test battery were selected. The proposed tests were divided into six categories...

  14. Stakeholder approach for evaluating organizational change projects.

    Science.gov (United States)

    Peltokorpi, Antti; Alho, Antti; Kujala, Jaakko; Aitamurto, Johanna; Parvinen, Petri

    2008-01-01

    This paper aims to create a model for evaluating organizational change initiatives from a stakeholder resistance viewpoint. The paper presents a model to evaluate change projects and their expected benefits. Factors affecting the challenge to implement change were defined based on stakeholder theory literature. The authors test the model's practical validity for screening change initiatives to improve operating room productivity. Change initiatives can be evaluated using six factors: the effect of the planned intervention on stakeholders' actions and position; stakeholders' capability to influence the project's implementation; motivation to participate; capability to change; change complexity; and management capability. The presented model's generalizability should be explored by filtering presented factors through a larger number of historical cases operating in different healthcare contexts. The link between stakeholders, the change challenge and the outcomes of change projects needs to be empirically tested. The proposed model can be used to prioritize change projects, manage stakeholder resistance and establish a better organizational and professional competence for managing healthcare organization change projects. New insights into existing stakeholder-related understanding of change project successes are provided.

  15. Making Things Happen Mastering Project Management

    CERN Document Server

    Berkun, Scott

    2008-01-01

    In the updated edition of this critically acclaimed and bestselling book, Microsoft insider Scott Berkun offers a collection of essays on field-tested philosophies and strategies for defining, leading, and managing projects. Based on his nine years of experience as a program manager for Microsoft's biggest projects, Berkun explains to technical and non-technical readers alike what it takes to get through a large software or web development project.

  16. Integrated Performance Testing for Nonproliferation Support Project

    Energy Technology Data Exchange (ETDEWEB)

    Johns, Russell; Bultz, Garl Alan; Byers, Kenneth R.; Yaegle, William

    2013-08-20

    The objective of this workshop is to provide participants with training in testing techniques and methodologies for assessment of the performance of: Physical Protection system elements; Material Control and Accounting (MC&A) system elements.

  17. The Mammographic Head Demonstrator Developed in the Framework of the “IMI” Project:. First Imaging Tests Results

    Science.gov (United States)

    Bisogni, Maria Giuseppina

    2006-04-01

    In this paper we report on the performances and the first imaging test results of a digital mammographic demonstrator based on GaAs pixel detectors. The heart of this prototype is the X-ray detection unit, which is a GaAs pixel sensor read-out by the PCC/MEDIPIXI circuit. Since the active area of the sensor is 1 cm2, 18 detectors have been organized in two staggered rows of nine chips each. To cover the typical mammographic format (18 × 24 cm2) a linear scanning is performed by means of a stepper motor. The system is integrated in mammographic equipment comprehending the X-ray tube, the bias and data acquisition systems and the PC-based control system. The prototype has been developed in the framework of the integrated Mammographic Imaging (IMI) project, an industrial research activity aiming to develop innovative instrumentation for morphologic and functional imaging. The project has been supported by the Italian Ministry of Education, University and Research (MIUR) and by five Italian High Tech companies in collaboration with the universities of Ferrara, Roma “La Sapienza”, Pisa and the INFN.

  18. BWR 9 X 9 Fuel Assembly Thermal-Hydraulic Tests (2): Hydraulic Vibration Test

    International Nuclear Information System (INIS)

    Yoshiaki Tsukuda; Katsuichiro Kamimura; Toshiitsu Hattori; Akira Tanabe; Noboru Saito; Masahiko Warashina; Yuji Nishino

    2002-01-01

    Nuclear Power Engineering Corporation (NUPEC) conducted thermal-hydraulic projects for verification of thermal-hydraulic design reliability for BWR high-burnup 8 x 8 and 9 x 9 fuel assemblies, entrusted by the Ministry of Economy, Trade and Industry (METI). As a part of the NUPEC thermal-hydraulic projects, hydraulic vibration tests using full-scale test assemblies simulating 9 x 9 fuel assemblies were carried out to evaluate BWR fuel integrity. The test data were applied to development of a new correlation for the estimation of fuel rod vibration amplitude. (authors)

  19. Pre-Test CFD for the Design and Execution of the Enhanced Injection and Mixing Project at NASA Langley Research Center

    Science.gov (United States)

    Drozda, Tomasz G.; Axdahl, Erik L.; Cabell, Karen F.

    2014-01-01

    With the increasing costs of physics experiments and simultaneous increase in availability and maturity of computational tools it is not surprising that computational fluid dynamics (CFD) is playing an increasingly important role, not only in post-test investigations, but also in the early stages of experimental planning. This paper describes a CFD-based effort executed in close collaboration between computational fluid dynamicists and experimentalists to develop a virtual experiment during the early planning stages of the Enhanced Injection and Mixing project at NASA Langley Research Center. This projects aims to investigate supersonic combustion ramjet (scramjet) fuel injection and mixing physics, improve the understanding of underlying physical processes, and develop enhancement strategies and functional relationships relevant to flight Mach numbers greater than 8. The purpose of the virtual experiment was to provide flow field data to aid in the design of the experimental apparatus and the in-stream rake probes, to verify the nonintrusive measurements based on NO-PLIF, and to perform pre-test analysis of quantities obtainable from the experiment and CFD. The approach also allowed for the joint team to develop common data processing and analysis tools, and to test research ideas. The virtual experiment consisted of a series of Reynolds-averaged simulations (RAS). These simulations included the facility nozzle, the experimental apparatus with a baseline strut injector, and the test cabin. Pure helium and helium-air mixtures were used to determine the efficacy of different inert gases to model hydrogen injection. The results of the simulations were analyzed by computing mixing efficiency, total pressure recovery, and stream thrust potential. As the experimental effort progresses, the simulation results will be compared with the experimental data to calibrate the modeling constants present in the CFD and validate simulation fidelity. CFD will also be used to

  20. FY 1997 Report on New Sunshine Project. International co-operative projects (Australia-Japan solar energy technology cooperation, etc); 1997 nendo kokusai kyoryoku jigyo. Nichigonado taiyo energy gijutsu kyoryoku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Described herein are the progresses, memorandum concluded for the new project, NEDO/MUERI project activities, among others, for, e.g., Australia-Japan solar energy technology co-operative project. The photovoltaic cell outdoor exposure test project has been progressing as expected in Australia since FY 1996. The test data have been collected for one year and analyzed successively. The second information exchange workshop is scheduled in June 1998 in Sydney for the thin-film, polycrystalline photovoltaic cell manufacturing technologies. The new type photovoltaic cell long-term exposure test project has been started in FY 1997 as the new project in Oman. The weather conditions of the test site are very severe, very high both in temperature and humidity. The new type photovoltaic cell modules, centered by the amorphous silicon, will be exposure-tested in the severe atmospheres, to verify long-term reliability of the photovoltaic cells. A total of 5 types of the modules are to be exposure-tested; 3 types of 6 amorphous silicon cells, one type of 2 CdS/CdTe cells, and one type of 2 thin-film polycrystalline cells. (NEDO)

  1. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 1 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 1/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 101 achievement reports on joint research of solar energy power generation field test project. The contents of the achievement reports are the results and generalization of the joint research with respect to the solar energy power generation field test project. As regards the locations of executing the joint research, the locations by areas and applications are stated. By areas, the joint research was carried out on gymnasiums, parks, recreation centers in the standard areas, universities, sports facilities, public halls, agricultural associations, aged persons' homes, primary, middle and high schools, prefectural office buildings and industrial technology centers in cold districts; prefectural office buildings, agricultural associations, universities, museums, industrial technology centers in good insolation districts; museums, primary, middle and high schools, parks in strong wind and salt polluted districts; and universities and police stations in snowy districts. By applications, the joint research was performed on life cooperative halls, factories, nursery schools, hospitals, clinics, local newspaper companies, indoor warm-water swimming pools, and mushroom fields. (NEDO)

  2. Achievement reports on joint research of solar energy power generation field test project in fiscal 1997. Part 1 of 3; 1997 nendo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho 1/3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    This report is a collection of 101 achievement reports on joint research of solar energy power generation field test project. The contents of the achievement reports are the results and generalization of the joint research with respect to the solar energy power generation field test project. As regards the locations of executing the joint research, the locations by areas and applications are stated. By areas, the joint research was carried out on gymnasiums, parks, recreation centers in the standard areas, universities, sports facilities, public halls, agricultural associations, aged persons' homes, primary, middle and high schools, prefectural office buildings and industrial technology centers in cold districts; prefectural office buildings, agricultural associations, universities, museums, industrial technology centers in good insolation districts; museums, primary, middle and high schools, parks in strong wind and salt polluted districts; and universities and police stations in snowy districts. By applications, the joint research was performed on life cooperative halls, factories, nursery schools, hospitals, clinics, local newspaper companies, indoor warm-water swimming pools, and mushroom fields. (NEDO)

  3. Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-08-01

    The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.

  4. The NCI Digital Divide Pilot Projects: implications for cancer education.

    Science.gov (United States)

    Kreps, Gary L; Gustafson, David; Salovey, Peter; Perocchia, Rosemarie Slevin; Wilbright, Wayne; Bright, Mary Anne; Muha, Cathy

    2007-01-01

    The National Cancer Institute (NCI) supported four innovative demonstration research projects, "The Digital Divide Pilot Projects," to test new strategies for disseminating health information via computer to vulnerable consumers. These projects involved active research collaborations between the NCI's Cancer Information Service (CIS) and regional cancer control researchers to field test new approaches for enhancing cancer communication in vulnerable communities. The projects were able to use computers to successfully disseminate relevant cancer information to vulnerable populations. These demonstration research projects suggested effective new strategies for using communication technologies to educate underserved populations about cancer prevention, control, and care.

  5. UAS-NAS Flight Test Series 3: Test Environment Report

    Science.gov (United States)

    Hoang, Ty; Murphy, Jim; Otto, Neil

    2016-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration in the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability (SSI), Human Systems Integration (HSI), and Communications (Comm), and Certification to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Detect and Avoid (DAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project is conducting a series of human-in-the-loop (HITL) and flight test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity, and

  6. ITDG stoves project - the story so far

    Energy Technology Data Exchange (ETDEWEB)

    Joseph, S

    1981-12-01

    The ITDG stoves project was initiated in 1978 and funded by ODA in 1979 to assist overseas organizations in the design, testing and development of wood-burning stoves, as a contribution to the deforestation problem. Collaboration has been established with three organizations in Indonesia, Sri Lanka and India who have the resources to undertake testing, design and dissemination of stoves. The strategy and performance of the stove project to date is evaluated.

  7. The role of PIXE in the AIRUSE projecttesting and development of air quality mitigation measures in Southern Europe”

    Energy Technology Data Exchange (ETDEWEB)

    Lucarelli, F., E-mail: lucarelli@fi.infn.it [Department of Physics and Astronomy – University of Florence (Italy); National Institute of Nuclear Physics (INFN) – Florence, Via G. Sansone 1, 50019 Sesto Fiorentino (Italy); Chiari, M. [National Institute of Nuclear Physics (INFN) – Florence, Via G. Sansone 1, 50019 Sesto Fiorentino (Italy); Calzolai, G. [Department of Physics and Astronomy – University of Florence (Italy); Giannoni, M.; Nava, S. [National Institute of Nuclear Physics (INFN) – Florence, Via G. Sansone 1, 50019 Sesto Fiorentino (Italy); Udisti, R.; Severi, M. [Department of Chemistry – University of Florence, Via della Lastruccia 3, 50019 Sesto Fiorentino (Italy); Querol, X.; Amato, F. [Institute of Environmental Assessment and Water Research (IDAEA-CSIC), 08034 Barcelona (Spain); Alves, C. [Centre for Environmental and Marine Studies (CESAM), Department of Environment, University of Aveiro, 3810-193 Aveiro (Portugal); Eleftheriadis, K. [Environmental Radioactivity Laboratory, N.C.S.R. Demokritos Univ., 15341 Ag. Paraskevi, Attiki (Greece)

    2015-11-15

    The European AIRUSE LIFE+ project aims at testing existing and future mitigation measures and developing new strategies for the improvement of air quality in Southern European countries. The project involves public and private institutions of Spain, UK, Portugal, Italy and Greece. PM10 and PM2.5 daily samplings have been scheduled for one year (from January 2013) in four urban sites, Barcelona (Spain), Porto (Portugal), Athens (Greece), and Florence (Italy). The daily data set gives an overall representative picture of the PM composition in these urban sites. The project includes also samplings with hourly resolution for limited periods. Hourly samples give an easier identification of the different aerosol sources due to the capability of tracking rapid changes as the ones occurring in many particulate emissions as well as in atmospheric transport and dilution processes. The role of PIXE technique within the project has been described in this paper. The comparison of data obtained by different techniques (e.g. PIXE, IC and ICP) assured a quality assurance control on the huge quantity of data obtained in the project. PIXE data together with those obtained by other analytical techniques have been used to reconstruct the average aerosol chemical composition and in Positive Matrix Factorization (PMF) analysis to determine the aerosol sources and their impact on PM10 and PM2.5 mass. In particular the high sensitivity of PIXE for all the crustal elements (including Si which is not easily detected by ICP) allows the direct determination of the Saharan dust contribution. Finally, the 1-h resolution data, which can be obtained only by PIXE, confirmed and reinforced the identification of the aerosol sources obtained by the daily concentrations.

  8. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  9. TMACS Test Procedure TP008: SACS Interface. Revision 5

    International Nuclear Information System (INIS)

    Washburn, S.J.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions

  10. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Guenter (RISA Sicherheitsanalysen GmbH (DE)); Jaenkaelae, Kalle (Fortum Nuclear Services Oy (FI)); Johanson, Gunnar; Lindberg, Sandra (ES Konsult, Stockholm (SE)); Knochenhauer, Michael (Relcon Scandpower AB, Stockholm (SE)); Schubert, Bernd (Vattenfall Europe (DE)); Vaurio, Jussi (Prometh Solutions (FI)); Wohlstein, Ralf (E.ON Kernkraft, Maschinentechnik (DE))

    2007-10-15

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  11. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    International Nuclear Information System (INIS)

    Becker, Guenter; Jaenkaelae, Kalle; Johanson, Gunnar; Lindberg, Sandra; Knochenhauer, Michael; Sc hubert, Bernd; Vaurio, Jussi; Wohlstei n, Ralf

    2007-10-01

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  12. Thermal Testing Measurements Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Wagner

    2002-09-26

    The purpose of the Thermal Testing Measurements Report (Scientific Analysis Report) is to document, in one report, the comprehensive set of measurements taken within the Yucca Mountain Project Thermal Testing Program since its inception in 1996. Currently, the testing performed and measurements collected are either scattered in many level 3 and level 4 milestone reports or, in the case of the ongoing Drift Scale Test, mostly documented in eight informal progress reports. Documentation in existing reports is uneven in level of detail and quality. Furthermore, while all the data collected within the Yucca Mountain Site Characterization Project (YMP) Thermal Testing Program have been submitted periodically to the Technical Data Management System (TDMS), the data structure--several incremental submittals, and documentation formats--are such that the data are often not user-friendly except to those who acquired and processed the data. The documentation in this report is intended to make data collected within the YMP Thermal Testing Program readily usable to end users, such as those representing the Performance Assessment Project, Repository Design Project, and Engineered Systems Sub-Project. Since either detailed level 3 and level 4 reports exist or the measurements are straightforward, only brief discussions are provided for each data set. These brief discussions for different data sets are intended to impart a clear sense of applicability of data, so that they will be used properly within the context of measurement uncertainty. This approach also keeps this report to a manageable size, an important consideration because the report encompasses nearly all measurements for three long-term thermal tests. As appropriate, thermal testing data currently residing in the TDMS have been reorganized and reformatted from cumbersome, user-unfriendly Input-Data Tracking Numbers (DTNs) into a new set of Output-DTNs. These Output-DTNs provide a readily usable data structure

  13. The Colibri Project

    DEFF Research Database (Denmark)

    Lopez, Jose Manuel Guterrez Lopez; Frick, Jan; Kirikova, Marite

    2015-01-01

    Colibri (Collaboration and Innovation for Better, Personalized and IT-Supported Teaching) is a three year project co-funded by the Erasmus + Strategic Partnership, starting in 2014. The project is being carried out by seven academic, two industrial, and one governmental organisation partners from...... eight different countries [1]. The main objective of the project is enhancing the quality and relevance of the learning offer in education by developing and systematically testing new and innovative approaches, and by supporting the dissemination and spreading of best practices. This is in the focus...... course on Future Internet Opportunities is part of the Living Lab, followed by 28 students and given by more than 10 different teachers. Both the teachers and the students represent different fields within computer science, electrical engineering, telecommunications, business informatics, management...

  14. Proving Test on the Reliability for Reactor Containment Vessel

    International Nuclear Information System (INIS)

    Takumi, K.; Nonaka, A.

    1988-01-01

    NUPEC (Nuclear Power Engineering Test Center) has started an eight-year project of Proving Test on the Reliability for Reactor Containment Vessel since June 1987. The objective of this project is to confirm the integrity of containment vessels under severe accident conditions. This paper shows the outline of this project. The test Items are (1) Hydrogen mixing and distribution test, (2) Hydrogen burning test, (3) Iodine trapping characteristics test, and (4) Structural behavior test. Based on the test results, computer codes are verified and as the results of analysis and evaluation by the computer codes, containment integrity is to be confirmed

  15. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    Directory of Open Access Journals (Sweden)

    Ida Ayu Ari Brahmantariguna

    2016-07-01

    Full Text Available Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed  in three stages:first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables  and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.

  16. Project assembling and commissioning of a rewetting test facility

    International Nuclear Information System (INIS)

    Rezende, H.C.

    1985-08-01

    A test facility (ITR - Instalacao de Testes de Remolhamento) has been erected at the Thermal-hydraulics Laboratory of CDTN, dedicated to the investigation of the basic phenomena that can occur during the reflood phase of a Loss of Coolant Accident (LOCA) in a Pressurized Water Reactor (PWR), utilizing tubular and annular test sections. The present work consists in a presentation of the facility design and a report of its commissioning. The mechanical aspects of the facility, its power supply system and its instrumentation are described. The results of the instruments calibration and two operational tests are presented and a comparison is done with calculations perfomed usign a computer code. (Author) [pt

  17. TRIBOLOGICAL TESTING IN SHEET METAL FORMING

    DEFF Research Database (Denmark)

    Vega Tarantino, Salvador

    alternative lubricants in order to substitute the old and harmful chlorinated paraffin oils. The present project is a small part included in that bigger project called Enlub, in which the newly developed lubricants have been tested by tribological simulative methods. The bending under tension test (BUT...

  18. Test Automation Process Improvement A case study of BroadSoft

    OpenAIRE

    Gummadi, Jalendar

    2016-01-01

    This master thesis research is about improvement of test automation process at BroadSoft Finland as a case study. Test automation project recently started at BroadSoft but the project is not properly integrated in to existing process. Project is about converting manual test cases to automation test cases. The aim of this thesis is about studying existing BroadSoft test process and studying different test automation frameworks. In this thesis different test automation process are studied ...

  19. Hot ductility testing and weld simulation tests

    International Nuclear Information System (INIS)

    Weber, G.; Schick, M.

    1999-01-01

    The objective of the project was to enhance the insight into the causes of intergranular cracks detected in austenitic circumferential welds at BWR pipes. The susceptibility of a variety of austenitic pipe materials to hot cracking during welding and in-service intergranular crack corrosion was examined. The assumption was cracking in the root area of the HAZ of a multiple-layer weld. Hot-ductility tests and weld simulation tests specifically designed for the project were performed with the austenitic LWR pipe materials 1.4553 (X6 CrNiNb 18 10 S), 1.4550 (X10 CrNiNb 18 9), 1.4533 (X6 CrNiTi 18 9, two weld pools), and a non-stabilized TP 304 (X5 CrNi 18 10). (orig./CB) [de

  20. Fire test database

    International Nuclear Information System (INIS)

    Lee, J.A.

    1989-01-01

    This paper describes a project recently completed for EPRI by Impell. The purpose of the project was to develop a reference database of fire tests performed on non-typical fire rated assemblies. The database is designed for use by utility fire protection engineers to locate test reports for power plant fire rated assemblies. As utilities prepare to respond to Information Notice 88-04, the database will identify utilities, vendors or manufacturers who have specific fire test data. The database contains fire test report summaries for 729 tested configurations. For each summary, a contact is identified from whom a copy of the complete fire test report can be obtained. Five types of configurations are included: doors, dampers, seals, wraps and walls. The database is computerized. One version for IBM; one for Mac. Each database is accessed through user-friendly software which allows adding, deleting, browsing, etc. through the database. There are five major database files. One each for the five types of tested configurations. The contents of each provides significant information regarding the test method and the physical attributes of the tested configuration. 3 figs

  1. Highly Automated Agile Testing Process: An Industrial Case Study

    Directory of Open Access Journals (Sweden)

    Jarosław Berłowski

    2016-09-01

    Full Text Available This paper presents a description of an agile testing process in a medium size software project that is developed using Scrum. The research methods used is the case study were as follows: surveys, quantifiable project data sources and qualitative project members opinions were used for data collection. Challenges related to the testing process regarding a complex project environment and unscheduled releases were identified. Based on the obtained results, we concluded that the described approach addresses well the aforementioned issues. Therefore, recommendations were made with regard to the employed principles of agility, specifically: continuous integration, responding to change, test automation and test driven development. Furthermore, an efficient testing environment that combines a number of test frameworks (e.g. JUnit, Selenium, Jersey Test with custom-developed simulators is presented.

  2. 'Outside the box thinking': An overview of an environmental qualification test from a test lab perspective

    International Nuclear Information System (INIS)

    Mitton, T.

    2004-01-01

    Most people in the nuclear Environmental Qualification (EQ) business know that the basis for qualification ultimately lies with an equipment's successful operation during and after exposure to a simulated harsh environment. As opposed to focusing specifically on the test results of an Environmental Qualification test program, this paper/presentation will offer a more detailed look at the mechanical, electrical and thermodynamic requirements as well as the project difficulties and solutions of one such project - particularly an extensive, large-scale, non-typical project. (author)

  3. Oxide fuel fabrication technology development of the FaCT project (1). Overall review of fuel technology development of the FaCT project

    International Nuclear Information System (INIS)

    Abe, Tomoyuki; Namekawa, Takashi; Tanaka, Kenya

    2011-01-01

    The FaCT project is in progress in Japan for the commercialization of fast reactor cycle system. The development goal of the fuel in the FaCT project is a low-decontaminated TRU homo-recycling in a closed cycle and extension in average discharge burn-up to 150 GWd/t. Research and development on innovative technologies concerning the short process, remote maintenance and cooling system of automatic fuel production equipments, long life cladding material and control of oxygen potential have been conducted in phase I of the FaCT project. As the result of various test including 600 g batch MOX tests, it is concluded that the short process is available to fuel pellet fabrication of the FaCT project. Although cold mock-up tests on test model of some typical process equipments suggest possibilities of remote maintenance of automatic fuel fabrication equipment, it is concluded that it still needs further efforts to judge the operability of the completely remote fabrication for low-decontaminated TRU fuel. A cold mock-up test on fuel pin assembling equipment show that influence of decay heat of MA can be managed by cooling system. Irradiation tests in BOR-60 indicate that 9Cr-ODS possess the satisfactory in-reactor performance as the long life cladding material if homogeneity of alloy element is adequately controlled. Modification of cladding tube fabrication process to ensure homogeneity and further development of measures to control oxygen potential inside the fuel pin are necessary to reach the burn-up target of the FaCT project. (author)

  4. Stress Tests and Vulnerability Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Wallner, A. [Austrian Institute of Ecology, Vienna (Austria); Lorenz, P. [ed.; Becker, O. [eds.; Weber, U. [Austrian Institute of Ecology, Vienna (Austria)

    2012-07-01

    After the accident in Fukushima, nuclear safety as topic in anti-nuclear work has gained importance within the Joint Project countries. Therefore, nuclear safety and in particular the activities of the European stress tests were chosen to be the main focus of the Joint Project 2011/2012 as well as the common theme of the national projects. This brochure describes: A) Vulnerability Assessment A critical review of the EU Nuclear Stress Tests in Bulgaria, Hungary, Romania and Ukraine is presented in chapter 1. The review details the main weaknesses identified within the stress tests. Important shortcomings not mentioned in the stress tests reports are also discussed. These evaluations do not claim to be exhaustive, but the findings contribute to a more comprehensive understanding of safety and risk of nuclear power plants in Europe. B) Transparency of the stress tests In chapter 2 the experience of the Joint Project NGOs concerning transparency of the stress tests is presented. The information is not meant to be an evaluation of the transparency of the stress tests in general – such an evaluation is not possible within the scope of this brochure. The evaluation aims to show activities concerning stress tests and how they were conceived by the JP NGOs. Some recommendations for improvement are given. C) Safety focus Within the main topic “nuclear safety” of the Joint Project 2011/2012 the NGOs of each JP country selected a special safety relevant topic, which is/was of particular interest in their country: Bulgaria: The short story of Belene NPP – The victory – Key points of the campaign against the nuclear power plant Romania: Risks of the CANDU reactor design Czech Republic: Results of the conference “Power Plant Load Testing: Safety Inspection or Propaganda?“ Slovakia: Safety deficits of the NPP Mochovce These safety relevant issues are discussed in separate sections within the brochure at hand. (author)

  5. Stress Tests and Vulnerability Assessment

    International Nuclear Information System (INIS)

    Wallner, A.; Lorenz, P.

    2012-01-01

    After the accident in Fukushima, nuclear safety as topic in anti-nuclear work has gained importance within the Joint Project countries. Therefore, nuclear safety and in particular the activities of the European stress tests were chosen to be the main focus of the Joint Project 2011/2012 as well as the common theme of the national projects. This brochure describes: A) Vulnerability Assessment A critical review of the EU Nuclear Stress Tests in Bulgaria, Hungary, Romania and Ukraine is presented in chapter 1. The review details the main weaknesses identified within the stress tests. Important shortcomings not mentioned in the stress tests reports are also discussed. These evaluations do not claim to be exhaustive, but the findings contribute to a more comprehensive understanding of safety and risk of nuclear power plants in Europe. B) Transparency of the stress tests In chapter 2 the experience of the Joint Project NGOs concerning transparency of the stress tests is presented. The information is not meant to be an evaluation of the transparency of the stress tests in general – such an evaluation is not possible within the scope of this brochure. The evaluation aims to show activities concerning stress tests and how they were conceived by the JP NGOs. Some recommendations for improvement are given. C) Safety focus Within the main topic “nuclear safety” of the Joint Project 2011/2012 the NGOs of each JP country selected a special safety relevant topic, which is/was of particular interest in their country: Bulgaria: The short story of Belene NPP – The victory – Key points of the campaign against the nuclear power plant Romania: Risks of the CANDU reactor design Czech Republic: Results of the conference “Power Plant Load Testing: Safety Inspection or Propaganda?“ Slovakia: Safety deficits of the NPP Mochovce These safety relevant issues are discussed in separate sections within the brochure at hand. (author)

  6. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) : Demonstration Project for the Dallas region. Coordinated corridor operations and management is : predicated on being able to share transportation informa...

  7. Mars Science Laboratory Flight Software Boot Robustness Testing Project Report

    Science.gov (United States)

    Roth, Brian

    2011-01-01

    On the surface of Mars, the Mars Science Laboratory will boot up its flight computers every morning, having charged the batteries through the night. This boot process is complicated, critical, and affected by numerous hardware states that can be difficult to test. The hardware test beds do not facilitate testing a long duration of back-to-back unmanned automated tests, and although the software simulation has provided the necessary functionality and fidelity for this boot testing, there has not been support for the full flexibility necessary for this task. Therefore to perform this testing a framework has been build around the software simulation that supports running automated tests loading a variety of starting configurations for software and hardware states. This implementation has been tested against the nominal cases to validate the methodology, and support for configuring off-nominal cases is ongoing. The implication of this testing is that the introduction of input configurations that have yet proved difficult to test may reveal boot scenarios worth higher fidelity investigation, and in other cases increase confidence in the robustness of the flight software boot process.

  8. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  9. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to

  10. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    International Nuclear Information System (INIS)

    Walker, Randy M.; Gross, Ian G.; Smith, Cyrus M.; Hill, David E.

    2011-01-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  11. OECD/NEA Aagesta decontamination project. Phase 1, final report

    International Nuclear Information System (INIS)

    1982-12-01

    The objective of the project is to utilize the four primary loops of the Aagesta reactor to demonstrate decontamination methods for PWR primary systems. The first phase of the project consisted of laboratory scale tests. The methods tested were developed at a) Studsvik Energiteknik AB, Sweden (a soft chemistry). b) Kraftwerk Union AG, Federal Republic of Germany, (two chemistries, one soft and one hard). c) Swiss Federal Institute of Reactor Research (two chemistries, one soft and one hard). d) Berkeley Nuclear Laboratories, United Kingdom, (a soft chemistry). The test programme consisted of decontamination tests on steam generator tubing and other active material from Aagesta and a number of operating reactors as well as material compatibility tests on standardized samples of a representative selection of modern PWR primary system materials. Six countries have participated in Phase I of the project - the four countries named above as well as the United States of America and Italy. Studsvik Energiteknik AB was appointed Project leader. The results show that all six processes in general met the acceptance criteria both regarding decontamination and corrosion. The decontamination results with the hard chemistries were rather uneven. (Author)

  12. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  13. Project "Hypertension Alert."

    Science.gov (United States)

    Sailors, Emma Lou

    1983-01-01

    "Hypertension Alert," a 1979-80 blood pressure screening-awareness project of the Yonkers, New York Public Schools, is described. Data is analyzed in tables for ethnic composition, and range of blood pressure readings for the high school, junior high school, and elementary school students tested. (Author/JMK)

  14. Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

    Science.gov (United States)

    Sauerwein, Timothy A.; Gostomski, Tom

    2007-01-01

    The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all

  15. [A case of musicogenic epilepsy induced by listening to an American pop music].

    Science.gov (United States)

    Nakano, M; Takase, Y; Tatsumi, C

    1998-12-01

    This is the second report of musicogenic epilepsy in Japan. A 23-year-old woman was admitted to our hospital due to the musicogenic epilepsy. She had four generalized tonic clonic seizures at 18 and 19 years old. Since 19, she had had complex partial seizures lasting for about 20 seconds which was easily evoked by listening to an American pops particularly "Dreamlover" song by Mariah Carey. Brian MRI and interictal 99mTc HMPAO-SPECT showed no abnormalities. In the ictal EEG recording, three minutes after listening to the song, seizure activities were recorded from the right temporal region with 11Hz rhythmic epileptiform activities over the right temporal region and subsequent delta activities over the right hemisphere. The song that induced the seizure had a specific meaning that might evoke her emotion as had been pointed out in the previous reports.

  16. K Basin Sludge Conditioning Process Testing Project. Results from Test 4, ''Acid Digestion of Mixed-Bed Ion Exchange Resin''

    International Nuclear Information System (INIS)

    Pool, K.H.; Delegard, C.H.; Schmidt, A.J.; Thornton, B.M.; Silvers, K.L.

    1998-06-01

    Approximately 73 m 3 of heterogeneous solid material, ''sludge,'' (upper bound estimate, Packer 1997) have accumulated at the bottom of the K Basins in the 100 K Area of the Hanford Site. This sludge is a mixture of spent fuel element corrosion products, ion exchange materials (organic and inorganic), graphite-based gasket materials, iron and aluminum metal corrosion products, sand, and debris (Makenas et al. 1996, 1997). In addition, small amounts of polychlorinated biphenyls (PCBs) have been found. Ultimately, it is planned to transfer the K Basins sludge to the Hanford double shell tanks (DSTs). The Hanford Spent Nuclear Fuel (HSNF) project has conducted a number of evaluations to examine technology and processing alternatives to pretreat K Basin sludge to meet storage and disposal requirements. From these evaluations, chemical pretreatment has been selected to address criticality issues, reactivity, and the destruction or removal of PCBs before the K Basin sludge can be transferred to the DSTs. Chemical pretreatment, referred to as the K Basin sludge conditioning process, includes nitric acid dissolution of the sludge (with removal of acid insoluble solids), neutrons absorber addition, neutralization, and reprecipitation. Laboratory testing is being conducted by the Pacific Northwest National Laboratory (PNNL) to provide data necessary to develop the sludge conditioning process

  17. Embedment Effect test on soil-structure interaction

    International Nuclear Information System (INIS)

    Nasuda, Toshiaki; Akino, Kinji; Izumi, Masanori.

    1991-01-01

    A project consisting of laboratory test and field test has been conducted to clarify the embedment effect on soil-structure interaction. The objective of this project is to obtain the data for improving and preparing seismic analysis codes regarding the behavior of embedded reactor buildings during earthquakes. This project was planned to study the effect of soil-structure interaction using small size soil-structure models as well as the large scale models. The project was started in April, 1986, and is scheduled to end in March, 1994. The laboratory test models and field test models, and the measurement with accelerometers and others are described. As the interim results, the natural frequency and damping factor increased, and the amplitude decreased by the embedment of the test models. Some earthquakes were recorded in a soft rock site. The epicenters of the earthquakes occurred in 1989 are shown. The field tests were carried out in three sites. Two sites were used for the dynamic test with four test models having 8 m x 8 m plane size and 10 m height. One site was used for the static test with one concrete block as a specimen. Two models represent BWR type reactor buildings, and two models represent PWR type buildings. (K.I.)

  18. Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    Rahmat Aryaeinejad; Douglas S. Crawford; Mark D. DeHart; George W. Griffith; D. Scott Lucas; Joseph W. Nielsen; David W. Nigg; James R. Parry; Jorge Navarro

    2010-09-01

    Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance and, to some extent, experiment management are obsolete, inconsistent with the state of modern nuclear engineering practice, and are becoming increasingly difficult to properly verify and validate (V&V). Furthermore, the legacy staff knowledge required for application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In 2009 the Idaho National Laboratory (INL) initiated a focused effort to address this situation through the introduction of modern high-fidelity computational software and protocols, with appropriate V&V, within the next 3-4 years via the ATR Core Modeling and Simulation and V&V Update (or “Core Modeling Update”) Project. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF).

  19. Forest energy project in Central Finland; Keski-Suomen metsaeenergia -projekti

    Energy Technology Data Exchange (ETDEWEB)

    Ahokas, M [Association of Central Finland, Jyvaeskylae (Finland); Kuitto, P J [VTT Energy, Jyvaeskylae (Finland)

    1997-12-31

    The Forest Energy Project of Central Finland is one of the topleading regional demonstration project in Finland for testing and studying of the complete energy wood delivery chains and energy wood utilization. It is a large development and technology transfer venture concentrated primarily on practical needs. Total delivery chains are formed of the best machine and method alternatives, and they are also demonstrated. The project offers hence a wide test field for regional and national techno/economical wood fuel development. The target of this provincial project is to collect and demonstrate the most promising energy wood procurement technologies and methods for utilization of energy producers, forest industry and small and medium sized industries co-operating with forest owners, contractors and forest organizations. An essential target of the project is to direct the know-how, concentrated in the project, to development of the energy field. The project is directed to international information delivery, to concrete widening of cooperation, on transfer of testing and training activities and utilization experiences in the field of wood energy. The Forest Energy Project of Central Finland is a demonstration project supervised by the Regional Council of Central Finland. The project is a part of the national Bioenergy Research Programme. A large number of provincial partners interested in wood fuels, e.g. energy wood suppliers, energy producers, communes, forest industry, forestry boards, forestry associations, wood delivery contractors, and equipment producers, take part in the project

  20. Forest energy project in Central Finland; Keski-Suomen metsaeenergia -projekti

    Energy Technology Data Exchange (ETDEWEB)

    Ahokas, M. [Association of Central Finland, Jyvaeskylae (Finland); Kuitto, P.J. [VTT Energy, Jyvaeskylae (Finland)

    1996-12-31

    The Forest Energy Project of Central Finland is one of the topleading regional demonstration project in Finland for testing and studying of the complete energy wood delivery chains and energy wood utilization. It is a large development and technology transfer venture concentrated primarily on practical needs. Total delivery chains are formed of the best machine and method alternatives, and they are also demonstrated. The project offers hence a wide test field for regional and national techno/economical wood fuel development. The target of this provincial project is to collect and demonstrate the most promising energy wood procurement technologies and methods for utilization of energy producers, forest industry and small and medium sized industries co-operating with forest owners, contractors and forest organizations. An essential target of the project is to direct the know-how, concentrated in the project, to development of the energy field. The project is directed to international information delivery, to concrete widening of cooperation, on transfer of testing and training activities and utilization experiences in the field of wood energy. The Forest Energy Project of Central Finland is a demonstration project supervised by the Regional Council of Central Finland. The project is a part of the national Bioenergy Research Programme. A large number of provincial partners interested in wood fuels, e.g. energy wood suppliers, energy producers, communes, forest industry, forestry boards, forestry associations, wood delivery contractors, and equipment producers, take part in the project

  1. OECD MCCI project 2-D Core Concrete Interaction (CCI) tests : CCI-3 test data report-thermalhydraulic results. Rev. 0 October 15, 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, M. T.; Lomperski, S.; Kilsdonk, D. J.; Aeschlimann, R. W.; Basu, S. (Nuclear Engineering Division); (NRC)

    2011-05-23

    The Melt Attack and Coolability Experiments (MACE) program addressed the issue of the ability of water to cool and thermally stabilize a molten core-concrete interaction when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. As a follow-on program to MACE, The Melt Coolability and Concrete Interaction Experiments (MCCI) project is conducting reactor material experiments and associated analysis to achieve the following objectives: (1) resolve the ex-vessel debris coolability issue through a program that focuses on providing both confirmatory evidence and test data for the coolability mechanisms identified in MACE integral effects tests, and (2) address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. Achievement of these two program objectives will demonstrate the efficacy of severe accident management guidelines for existing plants, and provide the technical basis for better containment designs for future plants. In terms of satisfying these objectives, the Management Board (MB) approved the conduct of a third long-term 2-D Core-Concrete Interaction (CCI) experiment designed to provide information in several areas, including: (i) lateral vs. axial power split during dry core-concrete interaction, (ii) integral debris coolability data following late phase flooding, and (iii) data regarding the nature and extent of the cooling transient following breach of the crust formed at the melt-water interface. This data report provides thermal hydraulic test results from the CCI-3 experiment, which was conducted on September 22, 2005. Test specifications for CCI-3 are provided in Table 1-1. This experiment investigated the interaction of a fully oxidized 375

  2. The PredictAD project

    DEFF Research Database (Denmark)

    Antila, Kari; Lötjönen, Jyrki; Thurfjell, Lennart

    2013-01-01

    Alzheimer's disease (AD) is the most common cause of dementia affecting 36 million people worldwide. As the demographic transition in the developed countries progresses towards older population, the worsening ratio of workers per retirees and the growing number of patients with age-related illnes...... candidates and implement the framework in software. The results are currently used in several research projects, licensed to commercial use and being tested for clinical use in several trials....... objective of the PredictAD project was to find and integrate efficient biomarkers from heterogeneous patient data to make early diagnosis and to monitor the progress of AD in a more efficient, reliable and objective manner. The project focused on discovering biomarkers from biomolecular data...

  3. Why Citizen Science Without Usability Testing Will Underperform

    Science.gov (United States)

    Romano, C.; Gay, P.; Owens, R.; Burlea, G.

    2017-12-01

    Citizen science projects must undergo usability testing and optimization if they are to meet their stated goals. This presentation will include video of usability tests conducted upon citizen science websites. Usability testing is essential to the success of online interaction, however, citizen science projects have just begun to include this critical activity. Interaction standards in citizen science lag behind those of commercial interests, and published research on this topic is limited. Since online citizen science is by definition, an exchange of information, a clear understanding of how users experience an online project is essential to informed decision-making. Usability testing provides that insight. Usability testing collects data via direct observation of a person while she interacts with a digital product, such as a citizen science website. The test participant verbalizes her thoughts while using the website or application; the moderator follows the participant and captures quantitative measurement of the participant's confidence of success as she advances through the citizen science project. Over 15 years of usability testing, we have observed that users who do not report a consistent sense of progress are likely to abandon a website after as few as three unrewarding interactions. Since citizen science is also a voluntary activity, ensuring seamless interaction for users is mandatory. Usability studies conducted on citizen science websites demonstrate that project teams frequently underestimate a user's need for context and ease of use. Without usability testing, risks to online citizen science projects include high bounce rate (users leave the website without taking any action), abandonment (of the website, tutorials, registration), misunderstanding instructions (causing disorientation and erroneous conclusions), and ultimately, underperforming projects.

  4. Continuous Improvement in Battery Testing at the NASA/JSC Energy System Test Area

    Science.gov (United States)

    Boyd, William; Cook, Joseph

    2003-01-01

    The Energy Systems Test Area (ESTA) at the Lyndon B. Johnson Space Center in Houston, Texas conducts development and qualification tests to fulfill Energy System Division responsibilities relevant to ASA programs and projects. EST A has historically called upon a variety of fluid, mechanical, electrical, environmental, and data system capabilities spread amongst five full-service facilities to test human and human supported spacecraft in the areas of propulsion systems, fluid systems, pyrotechnics, power generation, and power distribution and control systems. Improvements at ESTA are being made in full earnest of offering NASA project offices an option to choose a thorough test regime that is balanced with cost and schedule constraints. In order to continue testing of enabling power-related technologies utilized by the Energy System Division, an especially proactive effort has been made to increase the cost effectiveness and schedule responsiveness for battery testing. This paper describes the continuous improvement in battery testing at the Energy Systems Test Area being made through consolidation, streamlining, and standardization.

  5. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2017-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and

  6. MFTF-B PACE tests and final cost report

    International Nuclear Information System (INIS)

    Krause, K.H.; Kozman, T.A.; Smith, J.L.; Horan, R.J.

    1986-10-01

    The Mirror Fusion Test Facility (MFTF-B) construction project was successfully completed in February 1986, with the conclusion of the Plant and Capital Equipment (PACE) Tests. This series of tests, starting in September 1985 and running through February 1986, demonstrated the overall machine capabilities and special facilities accomplishments for the Mirror Fusion Test Facility Project

  7. Nuclear Waste Facing the Test of Time: The Case of the French Deep Geological Repository Project.

    Science.gov (United States)

    Poirot-Delpech, Sophie; Raineau, Laurence

    2016-12-01

    The purpose of this article is to consider the socio-anthropological issues raised by the deep geological repository project for high-level, long-lived nuclear waste. It is based on fieldwork at a candidate site for a deep storage project in eastern France, where an underground laboratory has been studying the feasibility of the project since 1999. A project of this nature, based on the possibility of very long containment (hundreds of thousands of years, if not longer), involves a singular form of time. By linking project performance to geology's very long timescale, the project attempts "jump" in time, focusing on a far distant future, without understanding it in terms of generations. But these future generations remain measurements of time on the surface, where the issue of remembering or forgetting the repository comes to the fore. The nuclear waste geological storage project raises questions that neither politicians nor scientists, nor civil society, have ever confronted before. This project attempts to address a problem that exists on a very long timescale, which involves our responsibility toward generations in the far future.

  8. Case Report: HIV test misdiagnosis

    African Journals Online (AJOL)

    Case Study: HIV test misdiagnosis 124. Case Report: HIV ... A positive rapid HIV test does not require ... 3 College of Medicine - Johns Hopkins Research Project, Blantyre,. Malawi ... test results: a pilot study of three community testing sites.

  9. Ceramic Technology Project database: September 1993 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, B.L.P.

    1994-01-01

    Data presented in this report represent an intense effort to improve processing methods, testing methods, and general mechanical properties of candidate ceramics for use in advanced heat engines. Materials discussed include GN-10, GS-44, GTE PY6, NT-154, NT-164, sintered-reaction-bonded silicon nitrides, silicon nitride combined with rare-earth oxides, NT-230, Hexoloy SX-G1, Dow Corning`s {beta}-Si{sub 3}N{sub 4}, and a few whisker-reinforced ceramic composites. Information in this report was taken from the project`s semiannual and bimonthly progress reports and from final reports summarizing the results of individual studies. Test results are presented in tabular form and in graphs. All data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies but not to draw conclusions from those data.

  10. TMACS Test Procedure TP010: Integration summary. Revision 5

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The TMACS Soft Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes

  11. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  12. DSN Aperture Enhancement Project Office

    Science.gov (United States)

    Marina, Miguel

    2012-01-01

    All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

  13. 15 MW HArdware-in-the-loop Grid Simulation Project

    Energy Technology Data Exchange (ETDEWEB)

    Rigas, Nikolaos [Clemson Univ., SC (United States); Fox, John Curtiss [Clemson Univ., SC (United States); Collins, Randy [Clemson Univ., SC (United States); Tuten, James [Clemson Univ., SC (United States); Salem, Thomas [Clemson Univ., SC (United States); McKinney, Mark [Clemson Univ., SC (United States); Hadidi, Ramtin [Clemson Univ., SC (United States); Gislason, Benjamin [Clemson Univ., SC (United States); Boessneck, Eric [Clemson Univ., SC (United States); Leonard, Jesse [Clemson Univ., SC (United States)

    2014-10-31

    The 15MW Hardware-in-the-loop (HIL) Grid Simulator project was to (1) design, (2) construct and (3) commission a state-of-the-art grid integration testing facility for testing of multi-megawatt devices through a ‘shared facility’ model open to all innovators to promote the rapid introduction of new technology in the energy market to lower the cost of energy delivered. The 15 MW HIL Grid Simulator project now serves as the cornerstone of the Duke Energy Electric Grid Research, Innovation and Development (eGRID) Center. This project leveraged the 24 kV utility interconnection and electrical infrastructure of the US DOE EERE funded WTDTF project at the Clemson University Restoration Institute in North Charleston, SC. Additionally, the project has spurred interest from other technology sectors, including large PV inverter and energy storage testing and several leading edge research proposals dealing with smart grid technologies, grid modernization and grid cyber security. The key components of the project are the power amplifier units capable of providing up to 20MW of defined power to the research grid. The project has also developed a one of a kind solution to performing fault ride-through testing by combining a reactive divider network and a large power converter into a hybrid method. This unique hybrid method of performing fault ride-through analysis will allow for the research team at the eGRID Center to investigate the complex differences between the alternative methods of performing fault ride-through evaluations and will ultimately further the science behind this testing. With the final goal of being able to perform HIL experiments and demonstration projects, the eGRID team undertook a significant challenge with respect to developing a control system that is capable of communicating with several different pieces of equipment with different communication protocols in real-time. The eGRID team developed a custom fiber optical network that is based upon FPGA

  14. DECOVALEX III PROJECT. Thermal-Mechanical Modeling of the Yucca Mountain Project Drift Scale Test. Task 2B/2C Final Report

    International Nuclear Information System (INIS)

    Datta, Robin N.

    2005-02-01

    , ENRESA and NRC teams. All teams discretized the DST test area into two-dimensional vertical cross sections through the center of the heated drift and derived material properties suitable for their respective modeling approaches using the site testing data from Yucca Mountain project reports. The generally good agreement between simulated and measured temperature, displacements, and changes in air permeability shows that the numerical models and underlying conceptual models are adequate for simulating coupled THM processes at the DST. From the analyses and discussions presented, the following specific conclusions were drawn: i) A continuum model approach is adequate for simulating relevant coupled THM processes at the DST; ii) TM-induced rock deformations are generally well simulated using an elastic model, although some individual displacements appear to be captured using an elasto-plastic model; iii) The highest potential for inelastic deformation in the form of fracture shear slip occurs near the drift wall and in a zone of thermal stress decrease located more than 15 m above the heated drift and iv) Despite potential shear slip along fractures, fracture closure/opening caused by change in normal stress across fractures is the dominant mechanism for TM-induced changes in intrinsic fracture permeability, whereas fracture shear dilation appears to be less significant at the DST. This conclusion indicates that TM-induced changes in permeability at the DST, which are within one order of magnitude, tend to be reversible

  15. 10 MW Supercritical CO2 Turbine Test

    Energy Technology Data Exchange (ETDEWEB)

    Turchi, Craig

    2014-01-29

    The Supercritical CO2 Turbine Test project was to demonstrate the inherent efficiencies of a supercritical carbon dioxide (s-CO2) power turbine and associated turbomachinery under conditions and at a scale relevant to commercial concentrating solar power (CSP) projects, thereby accelerating the commercial deployment of this new power generation technology. The project involved eight partnering organizations: NREL, Sandia National Laboratories, Echogen Power Systems, Abengoa Solar, University of Wisconsin at Madison, Electric Power Research Institute, Barber-Nichols, and the CSP Program of the U.S. Department of Energy. The multi-year project planned to design, fabricate, and validate an s-CO2 power turbine of nominally 10 MWe that is capable of operation at up to 700°C and operates in a dry-cooled test loop. The project plan consisted of three phases: (1) system design and modeling, (2) fabrication, and (3) testing. The major accomplishments of Phase 1 included: Design of a multistage, axial-flow, s-CO2 power turbine; Design modifications to an existing turbocompressor to provide s-CO2 flow for the test system; Updated equipment and installation costs for the turbomachinery and associated support infrastructure; Development of simulation tools for the test loop itself and for more efficient cycle designs that are of greater commercial interest; Simulation of s-CO2 power cycle integration into molten-nitrate-salt CSP systems indicating a cost benefit of up to 8% in levelized cost of energy; Identification of recuperator cost as a key economic parameter; Corrosion data for multiple alloys at temperatures up to 650ºC in high-pressure CO2 and recommendations for materials-of-construction; and Revised test plan and preliminary operating conditions based on the ongoing tests of related equipment. Phase 1 established that the cost of the facility needed to test the power turbine at its full power and temperature would exceed the planned funding for Phases 2 and 3. Late

  16. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  17. Advanced Turbine Technology Applications Project (ATTAP)

    Science.gov (United States)

    1994-01-01

    Reports technical effort by AlliedSignal Engines in sixth year of DOE/NASA funded project. Topics include: gas turbine engine design modifications of production APU to incorporate ceramic components; fabrication and processing of silicon nitride blades and nozzles; component and engine testing; and refinement and development of critical ceramics technologies, including: hot corrosion testing and environmental life predictive model; advanced NDE methods for internal flaws in ceramic components; and improved carbon pulverization modeling during impact. ATTAP project is oriented toward developing high-risk technology of ceramic structural component design and fabrication to carry forward to commercial production by 'bridging the gap' between structural ceramics in the laboratory and near-term commercial heat engine application. Current ATTAP project goal is to support accelerated commercialization of advanced, high-temperature engines for hybrid vehicles and other applications. Project objectives are to provide essential and substantial early field experience demonstrating ceramic component reliability and durability in modified, available, gas turbine engine applications; and to scale-up and improve manufacturing processes of ceramic turbine engine components and demonstrate application of these processes in the production environment.

  18. TMACS test procedure TP003: Graphics. Revision 5

    International Nuclear Information System (INIS)

    Scanlan, P.K.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  19. TMACS test procedure TP003: Graphics. Revision 6

    International Nuclear Information System (INIS)

    Scanlan, P.K.; Washburn, S.

    1994-01-01

    The TMACS Software Project Test Procedures translate the project's acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays

  20. Fidelity of test development process within a national science grant

    Science.gov (United States)

    Brumfield, Teresa E.

    In 2002, a math-science partnership (MSP) program was initiated by a national science grant. The purpose of the MSP program was to promote the development, implementation, and sustainability of promising partnerships among institutions of higher education, K-12 schools and school systems, as well as other important stakeholders. One of the funded projects included a teacher-scientist collaborative that instituted a professional development system to prepare teachers to use inquiry-based instructional modules. The MSP program mandated evaluations of its funded projects. One of the teacher-scientist collaborative project's outcomes specifically focused on teacher and student science content and process skills. In order to provide annual evidence of progress and to measure the impact of the project's efforts, and because no appropriate science tests were available to measure improvements in content knowledge of participating teachers and their students, the project contracted for the development of science tests. This dissertation focused on the process of test development within an evaluation and examined planned (i.e., expected) and actual (i.e., observed) test development, specifically concentrating on the factors that affected the actual test development process. Planned test development was defined as the process of creating tests according to the well-established test development procedures recommended by the AERA/APA/NCME 1999 Standards for Educational and Psychological Testing. Actual test development was defined as the process of creating tests as it actually took place. Because case study provides an in-depth, longitudinal examination of an event (i.e., case) in a naturalistic setting, it was selected as the appropriate methodology to examine the difference between planned and actual test development. The case (or unit of analysis) was the test development task, a task that was bounded by the context in which it occurred---and over which this researcher had