WorldWideScience

Sample records for system project phase

  1. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  2. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  3. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  4. Interface control document for tank waste remediation system privatization phase 1 infrastructure support Project W-519

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This document describes the functional and physical interfaces between the Tank Waste Remediation System (TWRS) Privatization Phase 1 Infrastructure Project W-519 and the various other projects (i.e., Projects W-314, W-464, W-465, and W-520) supporting Phase 1 that will require the allocation of land in and about the Privatization Phase 1 Site and/or interface with the utilities extended by Project W-519. Project W-519 will identify land use allocations and upgrade/extend several utilities in the 200-East Area into the Privatization Phase 1 Site (formerly the Grout Disposal Compound) in preparation for the Privatization Contractors (PC) to construct treatment facilities. The project will upgrade/extend: Roads, Electrical Power, Raw Water (for process and fire suppression), Potable Water, and Liquid Effluent collection. The replacement of an existing Sanitary Sewage treatment system that may be displaced by Phase 1 site preparation activities may also be included

  5. Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

    Science.gov (United States)

    Moton, Tryshanda

    2016-01-01

    Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

  6. RF Phase Reference Distribution System for the TESLA Technology Based Projects

    CERN Document Server

    Czuba, K; Romaniuk, R S

    2013-01-01

    Since many decades physicists have been building particle accelerators and usually new projects became more advanced, more complicated and larger than predecessors. The importance and complexity of the phase reference distribution systems used in these accelerators have grown significantly during recent years. Amongst the most advanced of currently developed accelerators are projects based on the TESLA technology. These projects require synchronization of many RF devices with accuracy reaching femtosecond levels over kilometre distances. Design of a phase reference distribution system fulfilling such requirements is a challenging scientific task. There are many interdisciplinary problems which must be solved during the system design. Many, usually negligible issues, may became very important in such system. Furthermore, the design of a distribution system on a scale required for the TESLA technology based projects is a new challenge and there is almost no literature sufficiently covering this subject. This th...

  7. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  8. Phase II Final Project Report SBIR Project: "A High Efficiency PV to Hydrogen Energy System"

    Energy Technology Data Exchange (ETDEWEB)

    Slade, A; Turner, J; Stone, K; McConnell, R

    2008-09-02

    The innovative research conducted for this project contributed greatly to the understanding of generating low-cost hydrogen from solar energy. The project’s research identified two highly leveraging and complementary pathways. The first pathway is to dramatically increase the efficiency of converting sunlight into electricity. Improving solar electric conversion efficiency directly increases hydrogen production. This project produced a world record efficiency for silicon solar cells and contributed to another world record efficiency for a solar concentrator module using multijunction solar cells. The project’s literature review identified a second pathway in which wasted heat from the solar concentration process augments the electrolysis process generating hydrogen. One way to do this is to use a “heat mirror” that reflects the heat-producing infrared and transmits the visible spectrum to the solar cells; this also increases solar cell conversion efficiency. An economic analysis of this concept confirms that, if long-term concentrator photovoltaic (CPV) and solid-oxide electrolyzer cost goals can be achieved, hydrogen will be produced from solar energy cheaper than the cost of gasoline. The potential public benefits from this project are significant. The project has identified a potential energy source for the nation’s future electricity and transportation needs that is entirely “home grown” and carbon free. As CPV enter the nation’s utility markets, the opportunity for this approach to be successful is greatly increased. Amonix strongly recommends further exploration of this project’s findings.

  9. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  10. Local blur analysis and phase error correction method for fringe projection profilometry systems.

    Science.gov (United States)

    Rao, Li; Da, Feipeng

    2018-05-20

    We introduce a flexible error correction method for fringe projection profilometry (FPP) systems in the presence of local blur phenomenon. Local blur caused by global light transport such as camera defocus, projector defocus, and subsurface scattering will cause significant systematic errors in FPP systems. Previous methods, which adopt high-frequency patterns to separate the direct and global components, fail when the global light phenomenon occurs locally. In this paper, the influence of local blur on phase quality is thoroughly analyzed, and a concise error correction method is proposed to compensate the phase errors. For defocus phenomenon, this method can be directly applied. With the aid of spatially varying point spread functions and local frontal plane assumption, experiments show that the proposed method can effectively alleviate the system errors and improve the final reconstruction accuracy in various scenes. For a subsurface scattering scenario, if the translucent object is dominated by multiple scattering, the proposed method can also be applied to correct systematic errors once the bidirectional scattering-surface reflectance distribution function of the object material is measured.

  11. T-x projections of phase diagrams of the MeF-BeF2 systems

    International Nuclear Information System (INIS)

    Korenev, Yu.M.; Rykov, A.N.; Novoselova, A.V.

    1976-01-01

    The T-x projections of the state diagrams of the systems MeF-BeF 2 (Me=Li-Rb) have been plotted. Transformation of P-x cross sections of the system state diagrams with decreasing temperature have been considered with the aid, of the general view of T-x projections. The nature of sublimation of the compounds formed in these systems is discussed

  12. Aerospace Systems Monitor, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Proposal Title: Aerospace Systems Monitor PHASE 1 Technical Abstract: This Phase II STTR project will continue development and commercialization of the Aerospace...

  13. Caltrans WeatherShare Phase II System: An Application of Systems and Software Engineering Process to Project Development

    Science.gov (United States)

    2009-08-25

    In cooperation with the California Department of Transportation, Montana State University's Western Transportation Institute has developed the WeatherShare Phase II system by applying Systems Engineering and Software Engineering processes. The system...

  14. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project, UAS Control and Non-Payload Communication System Phase-1 Flight Test Results

    Science.gov (United States)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the prototype radio development, and results from phase 1 flight tests conducted during 2013.

  15. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Schillinger, Wolfgang; Weidemann, Rainer

    2016-01-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  16. 3D phase-shifting fringe projection system on the basis of a tailored free-form mirror.

    Science.gov (United States)

    Zwick, Susanne; Heist, Stefan; Steinkopf, Ralf; Huber, Sandra; Krause, Sylvio; Bräuer-Burchardt, Christian; Kühmstedt, Peter; Notni, Gunther

    2013-05-10

    Phase-shifting fringe projection is an effective method to perform 3D shape measurements. Conventionally, fringe projection systems utilize a digital projector that images fringes into the measurement plane. The performance of such systems is limited to the visible spectral range, as most projectors experience technical limitations in UV or IR spectral ranges. However, for certain applications these spectral ranges are of special interest. We present a wideband fringe projector that has been developed on the basis of a picture generating beamshaping mirror. This mirror generates a sinusoidal fringe pattern in the measurement plane without any additional optical elements. Phase shifting is realized without any mechanical movement by a multichip LED. As the system is based on a single mirror, it is wavelength-independent in a wide spectral range and therefore applicable in UV and IR spectral ranges. We present the design and a realized setup of this fringe projection system and the characterization of the generated intensity distribution. Experimental results of 3D shape measurements are presented.

  17. A Case Study : Application of the Systems Engineering Modeling in the early phases of a Complex Space System Project

    NARCIS (Netherlands)

    Bone, M.; Cloutier, R.L.; Gill, E.K.A.; Verma, D.

    2009-01-01

    There is increased recognition of the role of systems engineering in reducing the risk (technical, cost, and schedule) on complex space systems development and integration projects. A number of international systems engineering standards have been published in the last five years (ISO 15288, IEEE

  18. Study on quality assurance for high-level radioactive waste disposal project (2). Quality assurance system for the site characterization phase in the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Takada, Susumu

    2006-01-01

    The objective of this report is to assist related organizations in the development of quality assurance systems for a high-level radioactive waste disposal system. This report presents detail information with which related organizations can begin the development of quality assurance systems at an initial phase of repository development for a high-level radioactive waste disposal program, including data qualification, model validation, systems and facilities for quality assurance (e.g., technical data management system, sample management facility, etc.), and QA program applicability (items and activities). These descriptions are based on information in QA program for the Yucca Mountain Project (YMP), such as the U.S. Department of Energy (DOE) Quality Assurance Requirements and Description (QARD), DOE/RW-0333P, quality implementing procedures, and reports implemented by the procedures. Additionally, this report includes some brief recommendations for developing of quality assurance systems, such as establishment of quality assurance requirements, measures for establishment of QA system. (author)

  19. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    1999-01-01

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment

  20. QUEST2: Project plan for preliminary analysis/system architecture phase (PA/SA)

    International Nuclear Information System (INIS)

    Braaten, F.D.

    1995-01-01

    This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19

  1. P-T and T-x projections of phase diagram of CsF-ZrF4 system

    International Nuclear Information System (INIS)

    Karasev, N.M.; Korenev, Yu.M.; Sidorov, L.N.

    1980-01-01

    The CsF-ZrF 4 system has been investigated by the Knudsen effusion method and mass-spectral analysis of vaporization products. A molecular composition of vapour was determined. CsF, Cs 2 F 2 , ZrF 4 , Cs 2 ZrF 6 , CsZrF 5 , CsZr 2 F 9 molecules were found in the saturated vapour of the system. Heats of phase transitions and partial pressures of the molecules detected were determined depending on the melt compositions. Dissociation enthalpies of complex molecules were calculated. P-T and T-x projections of the state diagram of the CsF-ZrF 4 system were constructed

  2. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16; UIS BW Umweltinformationssystem Baden-Wuerttemberg. F+E-Vorhaben INOVUM. Innovative Umweltinformationssysteme. Phase I 2014/16

    Energy Technology Data Exchange (ETDEWEB)

    Weissenbach, Kurt [Ministerium fuer Umwelt, Klima und Energiewirtschaft Baden-Wuerttemberg, Stuttgart (Germany); Schillinger, Wolfgang [Landesanstalt fuer Umwelt, Messungen und Naturschutz Baden-Wuerttemberg (LUBW), Karlsruhe (Germany); Weidemann, Rainer (ed.) [Karlsruher Institut fuer Technologie (Germany). Inst. fuer Angewandte Informatik

    2016-07-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  3. Tank waste remediation system privatization phase I infrastructure, project W-519, Quality Assurance implementation plan

    International Nuclear Information System (INIS)

    HUSTON, J.J.

    1999-01-01

    This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001

  4. Unmanned aircraft system bridge inspection demonstration project phase II final report.

    Science.gov (United States)

    2017-06-01

    An Unmanned Aircraft System (UAS) is defined by the Federal Aviation Administration (FAA) as an aircraft operated without the possibility of direct human intervention from within the aircraft. Unmanned aircraft are familiarly referred to as drones, a...

  5. The first phase of transformation of an information system project: an essential element of success ?

    OpenAIRE

    Dorota LESZCZYŃSKA; Laurence SAGLIETTO

    2014-01-01

    If perception is a concept which is necessarily intuitive in the analysis of transformations in information systems, it is not to be taken into account at its fair value in existing theoretical models. These models are mainly interested in

  6. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    International Nuclear Information System (INIS)

    CARTER, R.P.

    1999-01-01

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective

  7. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  8. Yakima Basin Fish Passage Project, Phase 2

    International Nuclear Information System (INIS)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs

  9. Seismic Safety Margins Research Program (Phase I). Project VII. Systems analysis specification of computational approach

    International Nuclear Information System (INIS)

    Wall, I.B.; Kaul, M.K.; Post, R.I.; Tagart, S.W. Jr.; Vinson, T.J.

    1979-02-01

    An initial specification is presented of a computation approach for a probabilistic risk assessment model for use in the Seismic Safety Margin Research Program. This model encompasses the whole seismic calculational chain from seismic input through soil-structure interaction, transfer functions to the probability of component failure, integration of these failures into a system model and thereby estimate the probability of a release of radioactive material to the environment. It is intended that the primary use of this model will be in sensitivity studies to assess the potential conservatism of different modeling elements in the chain and to provide guidance on priorities for research in seismic design of nuclear power plants

  10. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  11. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

    Science.gov (United States)

    Grindle, Laurie; Hackenberg, Davis L.

    2016-01-01

    UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

  12. Qinshan Phase III (CANDU) nuclear power project quality assurance

    International Nuclear Information System (INIS)

    Wang Lingen; Du Jinxiang

    2001-01-01

    The completion and implementation of quality assurance system of Qinshan Phase III (CANDU) nuclear power project are presented. Some comments and understanding with consideration of the project characteristics are put forward

  13. Electronic construction collaboration system : phase III.

    Science.gov (United States)

    2011-12-01

    This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Br...

  14. Analysis of Reasons for fluctuation in seal oil system on generator and countermeasures in Qinshan phase III project

    International Nuclear Information System (INIS)

    Jin Xiaodong

    2012-01-01

    Reasons for hydraulic differential fluctuations seal hydrogen oil on generator in Qinshan phase III project were analyzed, provide a basis for modifying Run method is to determine the causes and effects of seal oil flow changes and in the relationship between flow changes and hydraulic differential hydrogen oil changes according to reason Results were analyzed to adjust the running test, to verify the feasibility of running adjustment programs

  15. Military Family Coping Project - Phase II

    Science.gov (United States)

    2015-05-01

    Anxiety, Life Satisfaction , Addiction, Trauma 4 The Military Family Coping Project reflects two phases. The first consisted of a series of focus...need for and guided the work of the Military Family Coping Project Phase II funded by TATRC. The Military Family Coping Project Phase II was...solidarity. For the purposes of family functioning analyses, married and unmarried soldiers were analyzed separately because marital status affects

  16. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  17. A dynamic systems engineering methodology research study. Phase 2: Evaluating methodologies, tools, and techniques for applicability to NASA's systems projects

    Science.gov (United States)

    Paul, Arthur S.; Gill, Tepper L.; Maclin, Arlene P.

    1989-01-01

    A study of NASA's Systems Management Policy (SMP) concluded that the primary methodology being used by the Mission Operations and Data Systems Directorate and its subordinate, the Networks Division, is very effective. Still some unmet needs were identified. This study involved evaluating methodologies, tools, and techniques with the potential for resolving the previously identified deficiencies. Six preselected methodologies being used by other organizations with similar development problems were studied. The study revealed a wide range of significant differences in structure. Each system had some strengths but none will satisfy all of the needs of the Networks Division. Areas for improvement of the methodology being used by the Networks Division are listed with recommendations for specific action.

  18. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  19. Mismanagement Reasons of the Projects Execution Phase

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Agele

    2017-10-01

    Full Text Available The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts., in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area. Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

  20. A distributed agent architecture for real-time knowledge-based systems: Real-time expert systems project, phase 1

    Science.gov (United States)

    Lee, S. Daniel

    1990-01-01

    We propose a distributed agent architecture (DAA) that can support a variety of paradigms based on both traditional real-time computing and artificial intelligence. DAA consists of distributed agents that are classified into two categories: reactive and cognitive. Reactive agents can be implemented directly in Ada to meet hard real-time requirements and be deployed on on-board embedded processors. A traditional real-time computing methodology under consideration is the rate monotonic theory that can guarantee schedulability based on analytical methods. AI techniques under consideration for reactive agents are approximate or anytime reasoning that can be implemented using Bayesian belief networks as in Guardian. Cognitive agents are traditional expert systems that can be implemented in ART-Ada to meet soft real-time requirements. During the initial design of cognitive agents, it is critical to consider the migration path that would allow initial deployment on ground-based workstations with eventual deployment on on-board processors. ART-Ada technology enables this migration while Lisp-based technologies make it difficult if not impossible. In addition to reactive and cognitive agents, a meta-level agent would be needed to coordinate multiple agents and to provide meta-level control.

  1. Onondaga Lake Watershed – A Geographic Information System Project Phase I – Needs assessment and spatial data framework

    Science.gov (United States)

    Freehafer, Douglas A.; Pierson, Oliver

    2004-01-01

    In the fall of 2002, the Onondaga Lake Partnership (OLP) formed a Geographic Information System (GIS) Planning Committee to begin the process of developing a comprehensive watershed geographic information system for Onondaga Lake. The goal of the Onondaga Lake Partnership geographic information system is to integrate the various types of spatial data used for scientific investigations, resource management, and planning and design of improvement projects in the Onondaga Lake Watershed. A needs-assessment survey was conducted and a spatial data framework developed to support the Onondaga Lake Partnership use of geographic information system technology. The design focused on the collection, management, and distribution of spatial data, maps, and internet mapping applications. A geographic information system library of over 100 spatial datasets and metadata links was assembled on the basis of the results of the needs assessment survey. Implementation options were presented, and the Geographic Information System Planning Committee offered recommendations for the management and distribution of spatial data belonging to Onondaga Lake Partnership members. The Onondaga Lake Partnership now has a strong foundation for building a comprehensive geographic information system for the Onondaga Lake watershed. The successful implementation of a geographic information system depends on the Onondaga Lake Partnership’s determination of: (1) the design and plan for a geographic information system, including the applications and spatial data that will be provided and to whom, (2) the level of geographic information system technology to be utilized and funded, and (3) the institutional issues of operation and maintenance of the system.

  2. PROJECT GOVERNANCE – PHASES AND LIFE CYCLE

    Directory of Open Access Journals (Sweden)

    Robbert Titus DEENEN

    2007-01-01

    Full Text Available When talking about projects, the barrier is clear: successful and failed. Some fail due to different reasons, but lack of good project and risk management played a large part. Others succeed largely because of the rigorous and disciplined application of good project practices. But both groups illustrate many points that underline and demonstrate important concepts applicable to current projects. Systematic application of good methods leads to successful outcomes in projects of all types. All projects are fundamentally dependent on people, and human beings are not very different today than we were hundreds, or even thousands, of years ago. This paper uncovers main elements in projects area such as the concepts and governance of projects, with an underline of the main characteristics and the projects phases and life cycle that erase the uncertainty that joins all the projects built at any time.

  3. Improving decision making in the early phases of configuration projects

    DEFF Research Database (Denmark)

    Mortensen, Niels Henrik; Harlou, Ulf; Haug, Anders

    2008-01-01

    During the early phases of configuration projects very important decisions are made which will heavily influence the performance of the company, benefits in different functional areas (production, sales, purchase, product development, service etc), maintenance of the configuration system...

  4. Improving decision making in the early phases of configuration projects

    DEFF Research Database (Denmark)

    Mortensen, Niels Henrik; Hvam, Lars; Harlou, Ulf

    2011-01-01

    During the early phases of configuration projects very important decisions are made which will heavily influence the performance of the company, benefits in different functional areas (production, sales, purchase, product development, service etc), maintenance of the configuration system...

  5. Savanna ecosystem project: phase I summary and phase II progress

    CSIR Research Space (South Africa)

    Huntely, BJ

    1978-07-01

    Full Text Available A summary of the results of the first phase (mid 1974 to mid 1976) of the South African Savanna Ecosystem Project being undertaken at Nylsvley in the northern Transvaal is presented. Phase I of this ten year study of the structure and functioning...

  6. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  7. Ultrasonic Communication Project, Phase 1, FY1999

    Energy Technology Data Exchange (ETDEWEB)

    Haynes, H.D.; Akerman, M.A.; Baylor, V.M.

    2000-06-01

    This Phase 1 project has been successful in identifying, exploring, and demonstrating methods for ultrasonic-based communication with an emphasis on the application of digital signal processing techniques. During the project, at the direction of the agency project monitor, particular attention was directed at sending and receiving ultrasonic data through air and through pipes that would be commonly found in buildings. Efforts were also focused on development of a method for transmitting computer files ultrasonically. New methods were identified and evaluated for ultrasonic communication. These methods are based on a technique called DFS. With DFS, individual alphanumeric characters are broken down into a sequence of bits, and each bit is used to generate a discrete ultrasonic frequency. Characters are then transmitted one-bit-at-a-time, and reconstructed by the receiver. This technique was put into practice through the development of LabVIEW{trademark}VIs. These VIs were integrated with specially developed electronic circuits to provide a system for demonstrating the transmission and reception/reconstruction of typed messages and computer files. Tests were performed to determine the envelope for ultrasound transmission through pipes (with and without water) versus through air. The practical aspects of connections, efficient electronics, impedance matching, and the effect of damping mechanisms were all investigated. These tests resulted in a considerable number of reference charts that illustrate the absorption of ultrasound through different pipe materials, both with and without water, as a function of distance. Ultrasound was found to be least attenuated by copper pipe and most attenuated by PVC pipe. Water in the pipe provides additional damping and attenuation of ultrasonic signals. Dramatic improvements are observed, however, in ultrasound signal strength if the transducers are directly coupled to the water, rather than simply attaching them to the outside of

  8. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  9. The impacts of smart cards on hospital information systems--an investigation of the first phase of the national health insurance smart card project in Taiwan.

    Science.gov (United States)

    Liu, Chien-Tsai; Yang, Pei-Tun; Yeh, Yu-Ting; Wang, Bin-Long

    2006-02-01

    To investigate the impacts of the first phase of Taiwan's Bureau of National Health Insurance (TBNHI) smart card project on existing hospital information systems. TBNHI has launched a nationwide project for replacement of its paper-based health insurance cards by smart cards (or NHI-IC cards) since November 1999. The NHI-IC cards have been used since 1 July 2003, and they have fully replaced the paper-based cards since 1 January 2004. Hospitals must support the cards in order to provide medical services for insured patients. We made a comprehensive study of the current phase of the NHI-IC card system, and conducted a questionnaire survey (from 1 October to 30 November, 2003) to investigate the impacts of NHI-IC cards on the existing hospital information systems. A questionnaire was distributed by mail to 479 hospitals, including 23 medical centers, 71 regional hospitals, and 355 district hospitals. The returned questionnaires were also collected by prepaid mail. The questionnaire return rates of the medical centers, regional hospitals and district hospitals were 39.1, 29.6 and 20.9%, respectively. In phase 1 of the project, the average number of card readers purchased per medical center, regional hospital, and district hospital were 202, 45 and 10, respectively. The average person-days for the enhancement of existing information systems of a medical center, regional hospital and district hospital were 175, 74 and 58, respectively. Three months after using the NHI-IC cards most hospitals (60.6%) experienced prolonged service time for their patients due to more interruptions caused mainly by: (1) impairment of the NHI-IC cards (31.2%), (2) failure in authentication of the SAMs (17.0%), (3) malfunction in card readers (15.3%) and (4) problems with interfaces between the card readers and hospital information systems (15.8%). The overall hospital satisfaction on the 5-point Likert scale was 2.86. Although most hospitals were OK with the project, there was about 22

  10. Seismic Safety Margins Research Program. Phase 1. Project V. Structural sub-system response: subsystem response review

    International Nuclear Information System (INIS)

    Fogelquist, J.; Kaul, M.K.; Koppe, R.; Tagart, S.W. Jr.; Thailer, H.; Uffer, R.

    1980-03-01

    This project is directed toward a portion of the Seismic Safety Margins Research Program which includes one link in the seismic methodology chain. The link addressed here is the structural subsystem dynamic response which consists of those components and systems whose behavior is often determined decoupled from the major structural response. Typically the mathematical model utilized for the major structural response will include only the mass effects of the subsystem and the main model is used to produce the support motion inputs for subsystem seismic qualification. The main questions addressed in this report have to do with the seismic response uncertainty of safety-related components or equipment whose seismic qualification is performed by (a) analysis, (b) tests, or (c) combinations of analysis and tests, and where the seismic input is assumed to have no uncertainty

  11. Configurable Project Collaboration Portal, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SplashNote Systems is proposing to develop a more effective and innovative approach to project collaboration in distributed teams. The proposed system uniquely gives...

  12. The analysis of mechanical behaviour of reactor coolant system layout scheme with 60 degree angle for the second phase project of Qinshan NPP

    International Nuclear Information System (INIS)

    Yu Ruhong

    1993-01-01

    For the reactor coolant system of the second phase project of Qinshan NPP, the layout scheme with two loops and an angle of 60 degree is adopted. In this scheme, two loops are connected to reactor pressure vessel (RPV), and the angle included between the inlet and outlet nozzles of the RPV is 60 degree in a same loop. The issues involved in the analysis of mechanical behaviour of piping system to demonstrate the validity of such a scheme are described briefly in the paper, including the modelling technique adopted in establishing mathematical model, the methods used for structural analysis of piping system, stress and fatigue analysis in piping fittings. A brief description of the calculation results are given and the feasibility and rationality are discussed

  13. Laser projection using generalized phase contrast

    DEFF Research Database (Denmark)

    Glückstad, Jesper; Palima, Darwin; Rodrigo, Peter John

    2007-01-01

    is introduced. An arbitrary phase shift filter eliminates the need for high-frequency modulation and conjugate phase encoding. This lowers device performance requirements and allows practical implementation with currently available dynamic spatial light modulators. (c) 2007 Optical Society of America.......We demonstrate experimental laser projection of a gray-level photographic image with 74% light efficiency using the generalized phase contrast (GPC) method. In contrast with a previously proposed technique [Alonzo et al., New J. Phys. 9, 132 (2007)], a new approach to image construction via GPC...

  14. Space Applications of Automation, Robotics and Machine Intelligence Systems (ARAMIS), phase 2. Volume 2: Telepresence project applications

    Science.gov (United States)

    Akin, D. L.; Minsky, M. L.; Thiel, E. D.; Kurtzman, C. R.

    1983-01-01

    The field of telepresence is defined and overviews of those capabilities that are now available, and those that will be required to support a NASA telepresence effort are provided. Investigation of NASA' plans and goals with regard to telepresence, extensive literature search for materials relating to relevant technologies, a description of these technologies and their state of the art, and projections for advances in these technologies over the next decade are included.

  15. Grid-connected integrated community energy system. Phase II, Stage 1, final report. Conceptual design, demand and fuel projections and cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-08

    The Phase I Report, Grid ICES, presented the broad alternatives and implications for development of an energy system satisfying thermal demand with the co-generation of electric power, all predicated on the use of solid fuels. Participants of the system are the University of Minnesota, operator and primary thermal user, and Northern States Power Company, primary electrical user; with St. Mary's Hospital, Fairview Hospital, and Augsburg College as Add-on Customers for the thermal service (Option I). Included for consideration are the Options of (II) solid waste disposal by the Pyrolysis Method, with heat recovery, and (III) conversion of a portion of the thermal system from steam to hot water distribution to increase co-generation capability and as a demonstration system for future expansion. This report presents the conceptual design of the energy system and each Option, with the economic implications identified so that selection of the final system can be made. Draft outline of the Environmental Assessment for the project is submitted as a separate report.

  16. Projected phase-change memory devices.

    Science.gov (United States)

    Koelmans, Wabe W; Sebastian, Abu; Jonnalagadda, Vara Prasad; Krebs, Daniel; Dellmann, Laurent; Eleftheriou, Evangelos

    2015-09-03

    Nanoscale memory devices, whose resistance depends on the history of the electric signals applied, could become critical building blocks in new computing paradigms, such as brain-inspired computing and memcomputing. However, there are key challenges to overcome, such as the high programming power required, noise and resistance drift. Here, to address these, we present the concept of a projected memory device, whose distinguishing feature is that the physical mechanism of resistance storage is decoupled from the information-retrieval process. We designed and fabricated projected memory devices based on the phase-change storage mechanism and convincingly demonstrate the concept through detailed experimentation, supported by extensive modelling and finite-element simulations. The projected memory devices exhibit remarkably low drift and excellent noise performance. We also demonstrate active control and customization of the programming characteristics of the device that reliably realize a multitude of resistance states.

  17. webinos project deliverable: Phase 1 Security Framework

    OpenAIRE

    webinos consortium

    2011-01-01

    The webinos project aims to deliver a cross-device web application runtime environment, providing a unified development platform and standardized inter-device communication and interaction. This document contains the first iteration of the technical security and privacy framework designed for the webinos project. It accompanies two other documents - D3.1 System Specification and D3.2 API Specifications - and refers to concepts developed in them. The security and privacy architecture aims to p...

  18. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  19. Phase Control in Nonlinear Systems

    Science.gov (United States)

    Zambrano, Samuel; Seoane, Jesús M.; Mariño, Inés P.; Sanjuán, Miguel A. F.; Meucci, Riccardo

    The following sections are included: * Introduction * Phase Control of Chaos * Description of the model * Numerical exploration of phase control of chaos * Experimental evidence of phase control of chaos * Phase Control of Intermittency in Dynamical Systems * Crisis-induced intermittency and its control * Experimental setup and implementation of the phase control scheme * Phase control of the laser in the pre-crisis regime * Phase control of the intermittency after the crisis * Phase control of the intermittency in the quadratic map * Phase Control of Escapes in Open Dynamical Systems * Control of open dynamical systems * Model description * Numerical simulations and heuristic arguments * Experimental implementation in an electronic circuit * Conclusions and Discussions * Acknowledgments * References

  20. Brazilian Decimetric Array (BDA) project - Phase II

    Science.gov (United States)

    Faria, C.; Stephany, S.; Sawant, H. S.; Cecatto, J. R.; Fernandes, F. C. R.

    2010-02-01

    The configuration of the second phase of the Brazilian Decimetric Array (BDA), installed at Cachoeira Paulista, Brazil (Longitude 45° 0‧ 20″ W and Latitude 22° 41‧ 19″ S), is a T-shaped array where 21 antennas are being added to existing 5 antennas of the first phase. In the third phase, in each arm of the T array, four more antennas will be added and baselines will be increased to 2.5 × 1.25 km in east-west and south directions, respectively. The antennas will be equally spaced at the distances of 250 meters from the central antenna of the T-array. Also, the frequency range will be increased to 1.2-1.7, 2.8 and 5.6 GHz. The Second phase of the BDA should be operational by the middle of 2010 and will operate in the frequency range of (1.2-1.7) GHz for solar and non solar observations. Here, we present the characteristics of the second phase of the BDA project, details of the array configuration, the u-v coverage, the synthesized beam obtained for the proposed configuration.

  1. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  2. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  3. The international INTRAVAL project. Phase 2, Summary report

    International Nuclear Information System (INIS)

    Larsson, A.; Pers, K.; Skagius, K.; Dverstorp, B.

    1997-01-01

    The international project INTRAVAL addresses the validation of models of transport of radionuclides through groundwater in the geosphere. Such models are used in the assessment of the long-term safety of radioactive waste disposal systems. The second phase of INTRAVAL, which started in 1990, was concluded at the end of 1993. The objective of Phase 2 was to increase the understanding how various geophysical, geohydrological and geochemical phenomena of importance for radionuclide transport from a repository to the biosphere could be described by mathematical models and to study the model validation process. Summarized results from Phase 2 of the INTRAVAL study are presented in this report. (K.A.)

  4. Tailoring Small IT Projects in the Project Planning Phase

    Science.gov (United States)

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  5. Bragg projection ptychography on niobium phase domains

    Science.gov (United States)

    Burdet, Nicolas; Shi, Xiaowen; Clark, Jesse N.; Huang, Xiaojing; Harder, Ross; Robinson, Ian

    2017-07-01

    Bragg projection ptychography (BPP) is a coherent x-ray diffraction imaging technique which combines the strengths of scanning microscopy with the phase contrast of x-ray ptychography. Here we apply it for high resolution imaging of the phase-shifted crystalline domains associated with epitaxial growth. The advantages of BPP are that the spatial extent of the sample is arbitrary, it is nondestructive, and it gives potentially diffraction limited spatial resolution. Here we demonstrate the application of BPP for revealing the domain structure caused by epitaxial misfit in a nanostructured metallic thin film. Experimental coherent diffraction data were collected from a niobium thin film, epitaxially grown on a sapphire substrate as the beam was scanned across the sample. The data were analyzed by BPP using a carefully selected combination of refinement procedures. The resulting image shows a close packed array of epitaxial domains, shifted with respect to each other due to misfit between the film and its substrate.

  6. FURTHER STUDIES ON UNCERTAINTY, CONFOUNDING, AND VALIDATION OF THE DOSES IN THE TECHA RIVER DOSIMETRY SYSTEM: Concluding Progress Report on the Second Phase of Project 1.1

    Energy Technology Data Exchange (ETDEWEB)

    Degteva, M. O.; Anspaugh, L. R.; Napier, Bruce A.

    2009-10-23

    This is the concluding Progress Report for Project 1.1 of the U.S./Russia Joint Coordinating Committee on Radiation Effects Research (JCCRER). An overwhelming majority of our work this period has been to complete our primary obligation of providing a new version of the Techa River Dosimetry System (TRDS), which we call TRDS-2009D; the D denotes deterministic. This system provides estimates of individual doses to members of the Extended Techa River Cohort (ETRC) and post-natal doses to members of the Techa River Offspring Cohort (TROC). The latter doses were calculated with use of the TRDS-2009D. The doses for the members of the ETRC have been made available to the American and Russian epidemiologists in September for their studies in deriving radiogenic risk factors. Doses for members of the TROC are being provided to European and Russian epidemiologists, as partial input for studies of risk in this population. Two of our original goals for the completion of this nine-year phase of Project 1.1 were not completed. These are completion of TRDS-2009MC, which was to be a Monte Carlo version of TRDS-2009 that could be used for more explicit analysis of the impact of uncertainty in doses on uncertainty in radiogenic risk factors. The second incomplete goal was to be the provision of household specific external doses (rather than village average). This task was far along, but had to be delayed due to the lead investigator’s work on consideration of a revised source term.

  7. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  8. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  9. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  10. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  11. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  12. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  13. OECD/NEA Aagesta decontamination project. Phase 1, final report

    International Nuclear Information System (INIS)

    1982-12-01

    The objective of the project is to utilize the four primary loops of the Aagesta reactor to demonstrate decontamination methods for PWR primary systems. The first phase of the project consisted of laboratory scale tests. The methods tested were developed at a) Studsvik Energiteknik AB, Sweden (a soft chemistry). b) Kraftwerk Union AG, Federal Republic of Germany, (two chemistries, one soft and one hard). c) Swiss Federal Institute of Reactor Research (two chemistries, one soft and one hard). d) Berkeley Nuclear Laboratories, United Kingdom, (a soft chemistry). The test programme consisted of decontamination tests on steam generator tubing and other active material from Aagesta and a number of operating reactors as well as material compatibility tests on standardized samples of a representative selection of modern PWR primary system materials. Six countries have participated in Phase I of the project - the four countries named above as well as the United States of America and Italy. Studsvik Energiteknik AB was appointed Project leader. The results show that all six processes in general met the acceptance criteria both regarding decontamination and corrosion. The decontamination results with the hard chemistries were rather uneven. (Author)

  14. Canadian trace emissions project management : phase 2

    International Nuclear Information System (INIS)

    Lajeunesse, J.J.G.

    1997-12-01

    A comprehensive emission study was carried out at Nova Scotia Power's Lingan generating station in which pulverized coal, bottom ash, bottom ash cooling water, fly ash and flue gas were sampled and analyzed for organic and inorganic priority substances. The sampling was done according to the recommended standard of sampling provided by the Canadian Electricity Association's 1992 report entitled 'Trace Emission Project Management : phase 1'. The objectives of this emission study were to show how priority substances are transformed and partitioned within the various process streams in a modern pulverized coal-fired utility boiler and to determine the type and emission rate of various priority substances in the flue gas. An emission data set was prepared in PISCES format, and the data was used to evaluate the effectiveness of the electrostatic precipitator for controlling the emissions of these priority substances. All but five of the elements tracked in the report had mass balances from 90 per cent to 112 per cent. The five elements for which such closure could not be achieved were zinc, mercury, selenium, chlorine and bromine.The data set produced was used to evaluate the Ontario Hydro 640 MJ/h pilot scale combustor and FACT mathematical models. 39 refs., 32 tabs., 10 figs., 2 appendices

  15. Borehole project - Final report of phase 3

    International Nuclear Information System (INIS)

    Pusch, R.; Ramqvist, G.

    2008-03-01

    The report describes borehole plugging techniques for use in deep boreholes extending from the ground surface, and construction and placement of plugs in holes of different lengths and orientations bored from the repository rooms. The principle employed is the one proposed in earlier phases of the project, i.e. to tightly seal those parts of boreholes where the rock has few fractures and a low hydraulic conductivity, and filling of those parts that intersect water-bearing fracture zones with physically stable material that does not need to be low-permeable. Four methods for tight plugging have been identified and tested and a technique has been found for filling boreholes that are intersected by fracture zones. The upper end of boreholes extending from the ground surface needs a 'mechanical' seal for which copper metal and concrete work well. The experience from plugging of a 550 m deep borehole at Olkiluoto (OL-KR24) has been compiled and plans worked out for sampling and testing of contacting clay and concrete in this hole and in short holes in the Aespoe URL. (orig.)

  16. Soboba Community Energy Solar Project - Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Estrada, Steven [Soboba Band of Luiseno Indians, San Jacinto, CA (United States)

    2017-12-31

    of the general membership but the positions for Vice-Chair, Tribal Secretary, Tribal Treasurer and Sergeant at Arms are decided by the elected council. The Soboba Tribal Administration encompasses several departments that serve the needs of the Tribe, the Reservation and the general public. They assist in day-to-day Tribal operations, public safety, Tribal family services, Native American assistance to needy families, cultural preservation, and Tribal environmental protection of natural resources, along with the monitoring of progress and needs of its Enterprises and the general public. The Tribe’s long term energy vision is to become self-sufficient and thereby attain greater control of its destiny, to control costs in view of rapidly rising electric utility expenses, and to maximize the use of renewable energy consistent with sustainable development practices. The project is a Renewable Energy System, specifically a ground mounted, fixed tilt, solar photovoltaic (PV) generating system with a rated capacity of 1.0MWac. The solar generated power serves the electric needs of the affected meters. It benefits every Tribal member since the cost of running the community Tribal facilities, including electric bills, comes out of the General Fund. The estimated 20 year project savings of $ 6,418,064 can be re-directed to other vital community needs, and the project will provide additional jobs for Tribal members. The project has been thoroughly researched and is ready to implement as soon as funding is approved.

  17. Sears Point Tidal Marsh Restoration Project: Phase I

    Science.gov (United States)

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  18. Pilot's Automated Weather Support System (PAWSS) concepts demonstration project. Phase 1: Pilot's weather information requirements and implications for weather data systems design

    Science.gov (United States)

    Crabill, Norman L.; Dash, Ernie R.

    1991-01-01

    The weather information requirements for pilots and the deficiencies of the current aviation weather support system in meeting these requirements are defined. As the amount of data available to pilots increases significantly in the near future, expert system technology will be needed to assist pilots in assimilating that information. Some other desirable characteristics of an automation-assisted system for weather data acquisition, dissemination, and assimilation are also described.

  19. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  20. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  1. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  2. Achievement report on contract research. Large-scale project - Results of 1st-phase research and development of MHD power generation system; Plant system no hyoka. Ogata project dai 1 ki MHD hatsuden system kenkyu kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-03-01

    Described in detail involving the results of component development, assessment, and the indication of problems are the power generation channel, superconductive magnets and a helium refrigeration and liquefaction unit, seeds collector, heat exchanger, combustor, etc. Described involving the result and effect of power generation system research and development and the indication of problems is the research on Mark V and Mark VI operation tests. Described in relation to thermal performance calculation, economic effectiveness calculation, and environmental conservation involving an MHD (magnetohydrodynamic) power plant are the combustion of heavy oil, combustion of natural gas, plant having a 1,000MW power generator as its base load, control of NOx and sulfur in MHD power generation, etc. As for planning for the next stage, the configuration of a 10MW MHD power generation plant, its equipment, construction cost, and preliminary element research, etc., are described. Furthermore, propositions are presented concerning future plans and the prospect of commercial MHD power generators, technological ripple effects due to MHD power generation research and development, and research and development in the future. (NEDO)

  3. IDC Reengineering Phase 2 & 3 Project Scope

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Prescott, Ryan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-01

    Sandia National Laboratories has prepared a cost estimate budgetary planning for the IDC Reengineering Phase 2 & 3 effort. This report provides the cost estimate and describes the methodology, assumptions, and cost model details used to create the cost estimate.

  4. Gates Precast Concrete User Project Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Love, Lonnie J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Post, Brian K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Roschli, Alex C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chesser, Phillip C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    The primary objective of the project was to demonstrate the viability of using carbon fiber reinforced ABS plastic and the Big Area Additive Manufacturing (BAAM) technology to rapidly manufacture molds for the precast concrete industry.

  5. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  6. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  7. Composite Repair System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — GTL has developed an innovative composite repair methodology known as the Composite Repair System (CRS). In this phase I effort, CRS is being developed for the...

  8. Berry phase in entangled systems

    International Nuclear Information System (INIS)

    Bertlmann, R.A.; Hasegawa, Y.; Hiesmayr, B.C.; Durstberger, C.

    2005-01-01

    Full text: The influence of the geometric phase, in particular the Berry phase, on an entangled spin-1/2 system is studied. We discuss in detail the case, where the geometric phase is generated only by one part of the Hilbert space. We are able to cancel the effects of the dynamical phase by using the 'spin-echo' method. We analyze how the Berry phase affects the Bell angles and the maximal violation of a CHSH-Bell inequality. Furthermore, we suggest an experimental realization of our setup within neutron interferometry. It is possible to create entanglement between different degrees of freedom (spin and spatial degree of freedom) for a single neutron. The influence of the geometrical phase on the entangled neutron state is tested experimentally which is work in progress. (author)

  9. Phase transition in finite systems

    International Nuclear Information System (INIS)

    Chomaz, Ph.; Duflot, V.; Duflot, V.; Gulminelli, F.

    2000-01-01

    In this paper we present a review of selected aspects of Phase transitions in finite systems applied in particular to the liquid-gas phase transition in nuclei. We show that the problem of the non existence of boundary conditions can be solved by introducing a statistical ensemble with an averaged constrained volume. In such an ensemble the microcanonical heat capacity becomes negative in the transition region. We show that the caloric curve explicitly depends on the considered transformation of the volume with the excitation energy and so does not bear direct informations on the characteristics of the phase transition. Conversely, partial energy fluctuations are demonstrated to be a direct measure of the equation of state. Since the heat capacity has a negative branch in the phase transition region, the presence of abnormally large kinetic energy fluctuations is a signal of the liquid gas phase transition. (author)

  10. Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds

    Science.gov (United States)

    Information about the SFBWQP Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquat

  11. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  12. Sears Point Tidal Marsh Restoration Project: Phase II

    Science.gov (United States)

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  13. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    Science.gov (United States)

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  14. Uncertainty in project phases: A framework for organisational change management

    DEFF Research Database (Denmark)

    Kreye, Melanie; Balangalibun, Sarah

    2015-01-01

    in the early stage of the change project but was delayed until later phases. Furthermore, the sources of uncertainty were found to be predominantly within the organisation that initiated the change project and connected to the project scope. Based on these findings, propositions for future research are defined......Uncertainty is an integral challenge when managing organisational change projects (OCPs). Current literature highlights the importance of uncertainty; however, falls short of giving insights into the nature of uncertainty and suggestions for managing it. Specifically, no insights exist on how...... uncertainty develops over the different phases of OCPs. This paper presents case-based evidence on different sources of uncertainty in OCPs and how these develop over the different project phases. The results showed some surprising findings as the majority of the uncertainty did not manifest itself...

  15. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  16. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  17. ART-Ada design project, phase 2

    Science.gov (United States)

    Lee, S. Daniel; Allen, Bradley P.

    1990-01-01

    Interest in deploying expert systems in Ada has increased. An Ada based expert system tool is described called ART-Ada, which was built to support research into the language and methodological issues of expert systems in Ada. ART-Ada allows applications of an existing expert system tool called ART-IM (Automated Reasoning Tool for Information Management) to be deployed in various Ada environments. ART-IM, a C-based expert system tool, is used to generate Ada source code which is compiled and linked with an Ada based inference engine to produce an Ada executable image. ART-Ada is being used to implement several expert systems for NASA's Space Station Freedom Program and the U.S. Air Force.

  18. SmartPark Technology Demonstration Project, Phase II: Final Report

    Science.gov (United States)

    2018-05-01

    The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...

  19. Materials Information for Science and Technology (MIST): Project overview: Phase 1 and 2 and general considerations

    Energy Technology Data Exchange (ETDEWEB)

    Grattidge, W.; Westbrook, J.; McCarthy, J.; Northrup, C. Jr.; Rumble, J. Jr.

    1986-11-01

    The National Bureau of Standards and the Department of Energy have embarked on a program to build a demonstration computerized materials data system called Materials Information for Science and Technology (MIST). This report documents the first two phases of the project. The emphasis of the first phase was on determining what information was needed and how it could impact user productivity. The second phase data from the Aerospace Metal Handbook on a set of alloys was digitized and incorporated in the system.

  20. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    Science.gov (United States)

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  1. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  2. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  3. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  4. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  5. Phase transitions in finite systems

    Energy Technology Data Exchange (ETDEWEB)

    Chomaz, Ph. [Grand Accelerateur National d' Ions Lourds (GANIL), DSM-CEA / IN2P3-CNRS, 14 - Caen (France); Gulminelli, F. [Caen Univ., 14 (France). Lab. de Physique Corpusculaire

    2002-07-01

    In this series of lectures we will first review the general theory of phase transition in the framework of information theory and briefly address some of the well known mean field solutions of three dimensional problems. The theory of phase transitions in finite systems will then be discussed, with a special emphasis to the conceptual problems linked to a thermodynamical description for small, short-lived, open systems as metal clusters and data samples coming from nuclear collisions. The concept of negative heat capacity developed in the early seventies in the context of self-gravitating systems will be reinterpreted in the general framework of convexity anomalies of thermo-statistical potentials. The connection with the distribution of the order parameter will lead us to a definition of first order phase transitions in finite systems based on topology anomalies of the event distribution in the space of observations. Finally a careful study of the thermodynamical limit will provide a bridge with the standard theory of phase transitions and show that in a wide class of physical situations the different statistical ensembles are irreducibly inequivalent. (authors)

  6. Phase transitions in finite systems

    International Nuclear Information System (INIS)

    Chomaz, Ph.; Gulminelli, F.

    2002-01-01

    In this series of lectures we will first review the general theory of phase transition in the framework of information theory and briefly address some of the well known mean field solutions of three dimensional problems. The theory of phase transitions in finite systems will then be discussed, with a special emphasis to the conceptual problems linked to a thermodynamical description for small, short-lived, open systems as metal clusters and data samples coming from nuclear collisions. The concept of negative heat capacity developed in the early seventies in the context of self-gravitating systems will be reinterpreted in the general framework of convexity anomalies of thermo-statistical potentials. The connection with the distribution of the order parameter will lead us to a definition of first order phase transitions in finite systems based on topology anomalies of the event distribution in the space of observations. Finally a careful study of the thermodynamical limit will provide a bridge with the standard theory of phase transitions and show that in a wide class of physical situations the different statistical ensembles are irreducibly inequivalent. (authors)

  7. NASA SBIR abstracts of 1991 phase 1 projects

    Science.gov (United States)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  8. NASA SBIR abstracts of 1992, phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  9. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  10. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  11. Small business innovation research. Abstracts of completed 1987 phase 1 projects

    Science.gov (United States)

    1989-01-01

    Non-proprietary summaries of Phase 1 Small Business Innovation Research (SBIR) projects supported by NASA in the 1987 program year are given. Work in the areas of aeronautical propulsion, aerodynamics, acoustics, aircraft systems, materials and structures, teleoperators and robotics, computer sciences, information systems, spacecraft systems, spacecraft power supplies, spacecraft propulsion, bioastronautics, satellite communication, and space processing are covered.

  12. TWRS phase 1 infrastructure project (W-519) characterization

    International Nuclear Information System (INIS)

    Mitchell, C.J.

    1998-01-01

    In order to treat the mixed radioactive and hazardous waste stored in 177 underground tanks, the Tank Waste Remediation System (TWRS) program is developing a 'demonstration' site for treatment and immobilization of these wastes by a private contractor. Project W-519 is providing the infrastructure support to this site by developing the designs and emplacing required pipelines, roads, electrical, etc. In support of the TWRS Phase 1 Infrastructure Project (W-519) Characterization, Numatec Hanford Corporation (NHC) contracted with Waste Management Federal Services, Inc., Northwest Operations (WMNW) to investigate a number of locations in and just outside the 200 East Area eastern fenceline boundary. These areas consisted of known or suspected waste lines or waste sites that could potentially impact the construction and emplacement of the proposed facility improvements, including waterlines and roads. These sites were all located subsurface and sugaring would be required to obtain sample material from the desired depth. The soils would then be sampled and submitted to the laboratory for analysis of radioactivity

  13. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  14. Project inspection using mobile technology - phase II : assessing the impacts of mobile technology on project inspection.

    Science.gov (United States)

    2015-01-01

    As mobile technology becomes widely available and affordable, transportation agencies can use this : technology to streamline operations involved within project inspection. This research, conducted in two : phases, identified opportunities for proces...

  15. Improving Climate Projections by Understanding How Cloud Phase affects Radiation

    Science.gov (United States)

    Cesana, Gregory; Storelvmo, Trude

    2017-01-01

    Whether a cloud is predominantly water or ice strongly influences interactions between clouds and radiation coming down from the Sun or up from the Earth. Being able to simulate cloud phase transitions accurately in climate models based on observational data sets is critical in order to improve confidence in climate projections, because this uncertainty contributes greatly to the overall uncertainty associated with cloud-climate feedbacks. Ultimately, it translates into uncertainties in Earth's sensitivity to higher CO2 levels. While a lot of effort has recently been made toward constraining cloud phase in climate models, more remains to be done to document the radiative properties of clouds according to their phase. Here we discuss the added value of a new satellite data set that advances the field by providing estimates of the cloud radiative effect as a function of cloud phase and the implications for climate projections.

  16. Three-phase Photovoltaic Systems

    DEFF Research Database (Denmark)

    Kerekes, Tamas; Sera, Dezso; Máthé, Lászlo

    2015-01-01

    , detailing the different photovoltaic inverter structures and topologies as well as discussing the different control layers within a grid-connected photovoltaic plant. Modulation schemes for various photovoltaic inverter topologies, grid synchronization, current control, active and reactive power control......Photovoltaic technology has experienced unprecedented growth in the last two decades, transforming from mainly off-grid niche generation to a major renewable energy technology, reaching approximately 180 GW of capacity worldwide at the end of 2014. Large photovoltaic power plants interfacing...... the grid through a three-phase power electronic converter are now well on the way to becoming a major player in the power system in many countries. Therefore, this article gives an overview of photovoltaic systems with a focus on three-phase applications, presenting these both from a hardware point of view...

  17. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-08-01

    The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a ''pilot'' or ''demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs

  18. Pilot Project to Optimize Superfund-financed Pump and Treat Systems: Summary Report and Lessons Learned

    Science.gov (United States)

    This report summarizes Phase II (site optimization) of the Nationwide Fund-lead Pump and Treat Optimization Project. This phase included conducting Remediation System Evaluations (RSEs) at each of the 20 sites selected in Phase I.

  19. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  20. European supercritical water cooled reactor (HPLWR Phase 2 project)

    International Nuclear Information System (INIS)

    Schulenberg, Thomas; Starflinger, Joerg; Marsault, Philippe; Bittermann, Dietmar; Maraczy, Czaba; Laurien, Eckart; Lycklama, Jan Aiso; Anglart, Henryk; Andreani, Michele; Ruzickova, Mariana; Heikinheimo, Liisa

    2010-01-01

    The High Performance Light Water Reactor (HPLWR), how the European Supercritical Water Cooled Reactor is called, is a pressure vessel type reactor operated with supercritical water at 25 MPa feedwater pressure and 500 deg C maximum core outlet temperature. It is designed and analyzed by a European consortium of 13 partners from 8 Euratom member states in the second phase of the HPLWR project. Most emphasis has been laid on a core with a thermal neutron spectrum, consisting of small, housed fuel assemblies with 40 fuel pins each and a central water box to improve the neutron moderation despite the low coolant density. Peak cladding temperatures of the fuel rods have been minimized by heating up the coolant in three steps with intermediate coolant mixing. The innovative core design with upward and downward flow through its assemblies has been studied with neutronic, thermal-hydraulic and stress analyses and has been reviewed carefully in a mid-term assessment. The containment design with its safety and residual heat removal systems is based on the latest boiling water reactor concept, but with different passive high pressure coolant injection systems to cause a forced convection through the core. The design concept of the steam cycle is indicating the envisaged efficiency increase to around 44%. Moreover, it provides the constraints to design the components of the balance of the plant. The project is accompanied by numerical studies of heat transfer of supercritical water in fuel assemblies and by material tests of candidate cladding alloys, performed by the consortium and supported by additional tests of the Joint Research Centre of the European Commission. An overview of results achieved up to now, given in this paper, is illustrating the latest scientific and technological advances. (author)

  1. Test Plan for Hydrogen Getters Project - Phase II

    International Nuclear Information System (INIS)

    Mroz, G.

    1999-01-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (''poison'') the effectiveness of the hydrogen getter. The result of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP. Phase II for the Hydrogen Getters Project will focus on four primary objectives: Conduct measurements of the relative permeability of hydrogen and chlorinated VOCs through Tedlar (and possibly other candidate packaging materials) Test alternative getter systems as alternatives to semi-permeable packaging materials. Candidates include DEB/Pd/Al2O3 and DEB/Cu-Pd/C. Develop, test, and deploy kinetic optimization model Perform drum-scale test experiments to demonstrate getter effectiveness

  2. Interest groups, the Lesotho Highlands Water Project Phase 1

    African Journals Online (AJOL)

    interest groups can bring about changes in the water policy arena. ... Lesotho Highlands Water Project Phase 1 as a case study. ... attempts to influence public policy and their representation ... ties concern the relations between state actors and non-state ..... 'bears responsibility here [LHWP], since it is the sponsor of.

  3. Small car exposure data project. Phase 1 : methodology

    Science.gov (United States)

    1985-10-01

    The Small Car Exposure Data Project represents the first phase of an effort to build a data : base of exposure variables for crash-avoidance studies. Among these are: (1) vehicle make, : model, year, body style, wheel base, weight, and horsepower; (2...

  4. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  5. Electronic construction collaboration system -- final phase.

    Science.gov (United States)

    2014-09-01

    This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as : Attolist) on the Iowa Falls Arch Bridge project and (2) develop a WPMS for projects under $10 million. : For the first maj...

  6. Phase accuracy evaluation for phase-shifting fringe projection profilometry based on uniform-phase coded image

    Science.gov (United States)

    Zhang, Chunwei; Zhao, Hong; Zhu, Qian; Zhou, Changquan; Qiao, Jiacheng; Zhang, Lu

    2018-06-01

    Phase-shifting fringe projection profilometry (PSFPP) is a three-dimensional (3D) measurement technique widely adopted in industry measurement. It recovers the 3D profile of measured objects with the aid of the fringe phase. The phase accuracy is among the dominant factors that determine the 3D measurement accuracy. Evaluation of the phase accuracy helps refine adjustable measurement parameters, contributes to evaluating the 3D measurement accuracy, and facilitates improvement of the measurement accuracy. Although PSFPP has been deeply researched, an effective, easy-to-use phase accuracy evaluation method remains to be explored. In this paper, methods based on the uniform-phase coded image (UCI) are presented to accomplish phase accuracy evaluation for PSFPP. These methods work on the principle that the phase value of a UCI can be manually set to be any value, and once the phase value of a UCI pixel is the same as that of a pixel of a corresponding sinusoidal fringe pattern, their phase accuracy values are approximate. The proposed methods provide feasible approaches to evaluating the phase accuracy for PSFPP. Furthermore, they can be used to experimentally research the property of the random and gamma phase errors in PSFPP without the aid of a mathematical model to express random phase error or a large-step phase-shifting algorithm. In this paper, some novel and interesting phenomena are experimentally uncovered with the aid of the proposed methods.

  7. Project Half Double: Current Results of Phase 1 and Phase 2, December 2017

    DEFF Research Database (Denmark)

    Svejvig, Per; Thorp Adland, Karoline; Zippora Klein, Judith Birte

    ’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved) and not as half the time...... of Project Half Double was initiated in June 2015. It is a two-phase project: phase 1 took place from June 2015 to June 2016 with seven pilot projects, and phase 2 is in progress from July 2016 to July 2018 with 10 pilot projects. The Half Double consortium: Implement Consulting Group is the project leader....... 2016, Svejvig et al. 2017). This report’s target group inludes practitioners in Danish industry and society in general. The editorial team from Aarhus University prepared the report from October 2017 to December 2017, which means that data about pilot projects from December 2017 is not included....

  8. High precision capacitive beam phase probe for KHIMA project

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Ji-Gwang, E-mail: windy206@hanmail.net [Korea Institute of Radiological and Medical Sciences, 215–4, Gongneung-dong, Nowon-t, Seoul 139–706 (Korea, Republic of); Yang, Tae-Keun [Korea Institute of Radiological and Medical Sciences, 215–4, Gongneung-dong, Nowon-t, Seoul 139–706 (Korea, Republic of); Forck, Peter [GSI Helmholtz Centre for Ion Research, Darmstadt 64291, German (Germany)

    2016-11-21

    In the medium energy beam transport (MEBT) line of KHIMA project, a high precision beam phase probe monitor is required for a precise tuning of RF phase and amplitude of Radio Frequency Quadrupole (RFQ) accelerator and IH-DTL linac. It is also used for measuring a kinetic energy of ion beam by time-of-flight (TOF) method using two phase probes. The capacitive beam phase probe has been developed. The electromagnetic design of the high precision phase probe was performed to satisfy the phase resolution of 1° (@200 MHz). It was confirmed by the test result using a wire test bench. The measured phase accuracy of the fabricated phase probe is 1.19 ps. The pre-amplifier electronics with the 0.125 ∼ 1.61 GHz broad-band was designed and fabricated for amplifying the signal strength. The results of RF frequency and beam energy measurement using a proton beam from the cyclotron in KIRAMS is presented.

  9. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  10. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  11. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  12. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  13. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  14. `95 computer system operation project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  15. '95 computer system operation project

    International Nuclear Information System (INIS)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  16. Phase-based Planning for Railway Infrastructure Projects

    DEFF Research Database (Denmark)

    Li, Rui

    2017-01-01

    is important in terms of economy and rail operations. This study presents two types of Phase-based Decision Support System (PDSS), i.e. Functional Phase-Based Planning Approach (F-PBPA) and Process-Oriented Phase-Based Planning Approach (PO-PBPA). They are used for decision support for the planning...... of the railway infrastructure maintenance activities at the strategic planning level. The objective is to achieve better economy, as well as improve cost efficiency. F-PBPA consists of ve main phases: Data Collection, Technical Optimization (TeO), Economic Optimization (EcO), Constrained Optimization (Co...... the costs. Finally, constrained optimization (CoO) includes additional constraints and it allows the railway expert to adjust input parameters, thereby to obtain alternative maintenance plans. PO-PBPA contains another systematic phase based process. With a focus on Life Cycle Cost (LCC), PO-PBPA can guide...

  17. Research project implementation of a risk-based performance monitoring system for nuclear power plants: Phase II - Type-D indicators. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Sewell, R.T. [EQE International. Inc., Evergreen, CO (United States); Khatib-Rahbar, M. [Energy Research, Inc., Rockville, MD (United States); Erikson, H. [Swedish Nuclear Power Inspectorate, Stockholm (Sweden)

    1999-02-01

    This study has established the basis for incorporating a meaningful set of Type-D performance indicators into an overall performance monitoring system based on a PSA framework. The relationships developed as part of this study enable various organizational, maintenance, and operational influences, that are manifested through key events that can be identified and reported at a plant, to be accounted for in terms of their impacts on safety. The relationships and the capability they pose are significant new and unique developments. The relationships require that plant-specific data on the key performance indicators be acquired and analyzed. This, in turn, necessitates that a regular and systematic supplementary data collection program be implemented. Hence, it is recommended here that such a data program be developed and undertaken, specifically within the context of an overall PSA-based safety monitoring system. Plant licensees should be responsible for the supplemental data collection effort; however, the data collection requirements should not pose an undue burden on the licensees. To the extent possible, the data collection program should be coordinated, and possibly integrated, with existing licensee data collection and event reporting efforts. This study was undertaken to help verify whether or not it would be feasible to proceed with a PSA-based performance monitoring program. Research performed for Part-1 investigation has resulted in the development of a systematic and structured approach for monitoring safety performance based on all types of plant events. The Type-D relationships were earlier identified as a key element of the proposed performance monitoring system, and if it would be discovered that the Type-D relationships could not be practically developed and implemented, then it would have lead to the recognition that the performance monitoring system might have little practical value. On the other hand, if the Type-D relationships could be efficiently

  18. Research project implementation of a risk-based performance monitoring system for nuclear power plants: Phase II - Type-D indicators. Final report

    International Nuclear Information System (INIS)

    Sewell, R.T.; Khatib-Rahbar, M.; Erikson, H.

    1999-02-01

    This study has established the basis for incorporating a meaningful set of Type-D performance indicators into an overall performance monitoring system based on a PSA framework. The relationships developed as part of this study enable various organizational, maintenance, and operational influences, that are manifested through key events that can be identified and reported at a plant, to be accounted for in terms of their impacts on safety. The relationships and the capability they pose are significant new and unique developments. The relationships require that plant-specific data on the key performance indicators be acquired and analyzed. This, in turn, necessitates that a regular and systematic supplementary data collection program be implemented. Hence, it is recommended here that such a data program be developed and undertaken, specifically within the context of an overall PSA-based safety monitoring system. Plant licensees should be responsible for the supplemental data collection effort; however, the data collection requirements should not pose an undue burden on the licensees. To the extent possible, the data collection program should be coordinated, and possibly integrated, with existing licensee data collection and event reporting efforts. This study was undertaken to help verify whether or not it would be feasible to proceed with a PSA-based performance monitoring program. Research performed for Part-1 investigation has resulted in the development of a systematic and structured approach for monitoring safety performance based on all types of plant events. The Type-D relationships were earlier identified as a key element of the proposed performance monitoring system, and if it would be discovered that the Type-D relationships could not be practically developed and implemented, then it would have lead to the recognition that the performance monitoring system might have little practical value. On the other hand, if the Type-D relationships could be efficiently

  19. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  20. The modification of main steam safety valves in Qinshan phase Ⅱ expansion project

    International Nuclear Information System (INIS)

    Chen Haiqiao

    2012-01-01

    The main steam safety valves of NPP steam system are second- class nuclear safety component. It used to limit the pressure of SG secondary side and main steam system via emitting steam into the environment. At present, the main steam safety valves have mechanical valves and assisted power valves. According to the experience of power plants at home and abroad, including Qinshan Phase Ⅱ unit 1/2 experience feedback, Qinshan Phase Ⅱ expansion project made modification on valve type, setting value and valve body. This paper introduce the characteristics of different safety valve types, the modification of main steam safety valves and the modification analysis on safety issues.security and impact on the other systems in Qinshan Phase Ⅱ expansion project. (author)

  1. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  2. Composite Overwrapped Pressure Vessels (COPV) Monitoring System Using Fiber, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Intelligent Fiber Optic Systems Corporation (IFOS) proposes, in this Phase 1 SBIR project, to demonstrate the feasibility of innovations based on an...

  3. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  4. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  5. Phases, phase equilibria, and phase rules in low-dimensional systems

    International Nuclear Information System (INIS)

    Frolov, T.; Mishin, Y.

    2015-01-01

    We present a unified approach to thermodynamic description of one, two, and three dimensional phases and phase transformations among them. The approach is based on a rigorous definition of a phase applicable to thermodynamic systems of any dimensionality. Within this approach, the same thermodynamic formalism can be applied for the description of phase transformations in bulk systems, interfaces, and line defects separating interface phases. For both lines and interfaces, we rigorously derive an adsorption equation, the phase coexistence equations, and other thermodynamic relations expressed in terms of generalized line and interface excess quantities. As a generalization of the Gibbs phase rule for bulk phases, we derive phase rules for lines and interfaces and predict the maximum number of phases than may coexist in systems of the respective dimensionality

  6. Code of Conduct for wind-power projects - Phases 1 and 2; Code of Conduct fuer windkraftprojekte. Phase 1 und 2 - Systemanalyse, Lessons Learned und Bewertung bestehender Instrumente

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-08-15

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  7. Assessing the influence of project management on quality during the early phases of construction projects

    Directory of Open Access Journals (Sweden)

    Ljevo Žanesa

    2018-12-01

    Full Text Available Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM processes that directly affect the quality of the delivered product (constructed building. This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives in terms of the indicators of quality of the delivered product. All par­ticipants, regardless of managerial perspective, believe that the most important indicator of the quality of prod­ucts for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046% of the basic set of vari­ables.

  8. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  9. Environmental information volume: Liquid Phase Methanol (LPMEOH trademark) project

    International Nuclear Information System (INIS)

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature

  10. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  11. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  12. Procedure Execution and Projection System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — There is a persistent pressure upon NASA crew members to achieve very high productivity during their missions. Significant challenges exist to maintaining manageable...

  13. Coordinate systems and map projections

    CERN Document Server

    Maling, DH

    1992-01-01

    A revised and expanded new edition of the definitive English work on map projections. The revisions take into account the huge advances in geometrical geodesy which have occurred since the early years of satellite geodesy. The detailed configuration of the geoid resulting from the GEOS and SEASAT altimetry measurements are now taken into consideration. Additionally, the chapter on computation of map projections is updated bearing in mind the availability of pocket calculators and microcomputers. Analytical derivation of some map projections including examples of pseudocylindrical and polyconic

  14. DECOVALEX-THMC Project. Task D. Long-Term Permeability/Porosity Changes in the EDZ and Near Field due to THM and THC Processes in Volcanic and Crystalline-Bentonite Systems. Phase 1 Report

    International Nuclear Information System (INIS)

    Birkholzer, J.; Rutqvist, J.; Sonnenthal, E.; Barr, D.

    2007-02-01

    The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. Three multi-year project stages of DECOVALEX have been completed in the past decade, mainly focusing on coupled thermal-hydrological-mechanical processes. Currently, a fourth three-year project stage of DECOVALEX is under way, referred to as DECOVALEX-THMC. THMC stands for Thermal, Hydrological, Mechanical, and Chemical processes. The new project stage aims at expanding the traditional geomechanical scope of the previous DECOVALEX project stages by incorporating geochemical processes important for repository performance. The U.S. Department of Energy (DOE) leads Task D of the new DECOVALEX phase, entitled 'Long-term Permeability/Porosity Changes in the EDZ and Near Field due to THC and THM Processes for Volcanic and Crystalline-Bentonite Systems.' In its leadership role for Task D, DOE coordinates and sets the direction for the cooperative research activities of the international research teams engaged in Task D. The research program developed for Task D of DECOVALEX-THMC involves geomechanical and geochemical research areas. THM and THC processes may lead to changes in hydrological properties that are important for performance because the flow processes in the vicinity of emplacement tunnels will be altered from their initial state. Some of these changes can be permanent (irreversible), in which case they persist after the thermal conditions have returned to ambient; i.e., they will affect the entire regulatory compliance period. Geochemical processes also affect the water and gas chemistry close to the waste packages, which are relevant for waste package corrosion, buffer stability, and radionuclide transport. Research teams participating in Task D evaluate long-term THM and THC processes in two generic geologic

  15. DECOVALEX-THMC Project. Task D. Long-Term Permeability/Porosity Changes in the EDZ and Near Field due to THM and THC Processes in Volcanic and Crystalline-Bentonite Systems. Phase 1 Report

    Energy Technology Data Exchange (ETDEWEB)

    Birkholzer, J.; Rutqvist, J.; Sonnenthal, E. [Lawrence Berkeley National Laboratory, CA (United States); Barr, D. [Office of Repository Development, DOE (United States)

    2007-02-15

    The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. Three multi-year project stages of DECOVALEX have been completed in the past decade, mainly focusing on coupled thermal-hydrological-mechanical processes. Currently, a fourth three-year project stage of DECOVALEX is under way, referred to as DECOVALEX-THMC. THMC stands for Thermal, Hydrological, Mechanical, and Chemical processes. The new project stage aims at expanding the traditional geomechanical scope of the previous DECOVALEX project stages by incorporating geochemical processes important for repository performance. The U.S. Department of Energy (DOE) leads Task D of the new DECOVALEX phase, entitled 'Long-term Permeability/Porosity Changes in the EDZ and Near Field due to THC and THM Processes for Volcanic and Crystalline-Bentonite Systems.' In its leadership role for Task D, DOE coordinates and sets the direction for the cooperative research activities of the international research teams engaged in Task D. The research program developed for Task D of DECOVALEX-THMC involves geomechanical and geochemical research areas. THM and THC processes may lead to changes in hydrological properties that are important for performance because the flow processes in the vicinity of emplacement tunnels will be altered from their initial state. Some of these changes can be permanent (irreversible), in which case they persist after the thermal conditions have returned to ambient; i.e., they will affect the entire regulatory compliance period. Geochemical processes also affect the water and gas chemistry close to the waste packages, which are relevant for waste package corrosion, buffer stability, and radionuclide transport. Research teams participating in Task D evaluate long-term THM and THC processes in two generic geologic

  16. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  17. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  18. Phase transition temperatures of Sn-Zn-Al system and their comparison with calculated phase diagrams

    Czech Academy of Sciences Publication Activity Database

    Smetana, B.; Zlá, S.; Kroupa, Aleš; Žaludová, M.; Drápala, J.; Burkovič, R.; Petlák, D.

    2012-01-01

    Roč. 110, č. 1 (2012), s. 369-378 ISSN 1388-6150 R&D Projects: GA MŠk(CZ) OC08053 Institutional support: RVO:68081723 Keywords : Sn-Zn-Al system * DTA * phase transition temperatures Subject RIV: BJ - Thermodynamics Impact factor: 1.982, year: 2012

  19. Nonlinear transport of dynamic system phase space

    International Nuclear Information System (INIS)

    Xie Xi; Xia Jiawen

    1993-01-01

    The inverse transform of any order solution of the differential equation of general nonlinear dynamic systems is derived, realizing theoretically the nonlinear transport for the phase space of nonlinear dynamic systems. The result is applicable to general nonlinear dynamic systems, with the transport of accelerator beam phase space as a typical example

  20. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  1. Maintenance Decision Support System, Phase III

    Science.gov (United States)

    2017-09-01

    The main goal of the project was to address barriers that limit NDOTs ability to implement MDSS and MMS systems. The four project tasks included: Task 1: Develop system for tracking sand and/or deicing material usage: A system that tracks where and w...

  2. Phase transition in finite systems

    International Nuclear Information System (INIS)

    Chomaz, Ph.; Duflot, V.; Duflot, V.; Gulminelli, F.

    2000-01-01

    The general problem of the definition of a phase transition without employing the thermodynamical limit is addressed. Different necessary conditions are considered and illustrated with examples from different nuclear and general physics phenomenologies. (authors)

  3. Phase transition in finite systems

    Energy Technology Data Exchange (ETDEWEB)

    Chomaz, Ph.; Duflot, V. [Grand Accelerateur National d' Ions Lourds (GANIL), 14 - Caen (France); Duflot, V.; Gulminelli, F. [Laboratoire de Physique Corpusculaire, LPC-ISMRa, CNRS-IN2P3, 14 - Caen (France)

    2000-07-01

    The general problem of the definition of a phase transition without employing the thermodynamical limit is addressed. Different necessary conditions are considered and illustrated with examples from different nuclear and general physics phenomenologies. (authors)

  4. Phase equilibria in Ca–Co–O system

    Czech Academy of Sciences Publication Activity Database

    Sedmidubský, D.; Jakeš, V.; Jankovský, O.; Leitner, J.; Šofer, Z.; Hejtmánek, Jiří

    2012-01-01

    Roč. 194, OCT (2012), s. 199-205 ISSN 0022-4596 R&D Projects: GA ČR GA203/09/1036 Institutional research plan: CEZ:AV0Z10100521 Keywords : Ca–Co–O system , Misfit cobaltites, Thermodynamic data, Phase diagrams * misfit cobaltites * thermodynamic data * phase diagrams Subject RIV: BM - Solid Matter Physics ; Magnetism Impact factor: 2.040, year: 2012

  5. Modelling of Phase Equlibria in the Hf-V System\

    Czech Academy of Sciences Publication Activity Database

    Vřešťál, Jan; Pavlů, Jana; Wdowik, U. D.; Šob, Mojmír

    2017-01-01

    Roč. 53, č. 3 (2017), s. 239-247 ISSN 1450-5339 R&D Projects: GA ČR GA14-15576S; GA MŠk(CZ) LQ1601 Institutional support: RVO:68081723 Keywords : Laves phases * Hf-V system * Ab initio calculations * Phase diagram * Zero Kelvin * CALPHAD method Subject RIV: BM - Solid Matter Physics ; Magnetism OBOR OECD: Condensed matter physics (including formerly solid state physics, supercond.) Impact factor: 0.804, year: 2016

  6. Application of isotopes and radiation to increasing agricultural production - Phase 2. Indonesia. Project findings and recommendations

    International Nuclear Information System (INIS)

    1992-01-01

    This Phase 2 Project was primarily aimed at consolidating the advances made during the previous phase, formulating practical agricultural technologies which can be adopted by farmers, disseminating and applying these technologies, and enhancing the capability of the Centre for Application of Isotopes and Radiation (CAIR) to conduct agricultural research using nuclear and related techniques. Outputs generated by this project were generally in accordance with those anticipated in the Project Document. Some outputs have been transferred to the target beneficiaries (farmers) through existing systems of extension, in co-operation with the main implementing agency (BATAN). Other outputs have potential for further assessment, and may lead to practical applications in future. The rest remain as important contributions to scientific knowledge. The project has been managed to assure sustainability after project termination. A strong indication of such sustainability is evident in the on-going research and development work at CAIR and the adoption of transferred technologies by the end-users. To keep up with rapid global advancements in bio-science and technology, a new project on application of nuclear and related techniques in agricultural bio-science and technology would be needed in relation to the second long-term phase of the national development programmes. (author)

  7. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  8. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  9. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  10. USL/DBMS NASA/PC R and D project system testing standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  11. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  12. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  13. Describing phase coexistence in systems with small phases

    International Nuclear Information System (INIS)

    Lovett, R

    2007-01-01

    Clusters of atoms can be studied in molecular beams and by computer simulation; 'liquid drops' provide elementary models for atomic nuclei and for the critical nuclei of nucleation theory. These clusters are often described in thermodynamic terms, but the behaviour of small clusters near a phase boundary is qualitatively different from the behaviour at a first order phase transition in idealized thermodynamics. In the idealized case the density and entropy show mathematically sharp discontinuities when the phase boundary is crossed. In large, but finite, systems, the phase boundaries become regions of state space wherein these properties vary rapidly but continuously. In small clusters with a large surface/volume ratio, however, the positive interfacial free energy makes it unlikely, even in states on phase boundaries, that a cluster will have a heterogeneous structure. What is actually seen in these states is a structure that fluctuates in time between homogeneous structures characteristic of the two sides of the phase boundary. That is, structural fluctuations are observed. Thermodynamics only predicts average properties; statistical mechanics is required to understand these fluctuations. Failure to distinguish thermodynamic properties and characterizations of fluctuations, particularly in the context of first order phase transitions, has led to suggestions that the classical rules for thermodynamic stability are violated in small systems and that classical thermodynamics provides an inconsistent description of these systems. Much of the confusion stems from taking statistical mechanical identifications of thermodynamic properties, explicitly developed for large systems, and applying them uncritically to small systems. There are no inconsistencies if thermodynamic properties are correctly identified and the distinction between thermodynamic properties and fluctuations is made clear

  14. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  15. The CEBAF fiber optic phase reference system

    International Nuclear Information System (INIS)

    Crawford, K.; Simrock, S.; Hovater, C.; Krycuk, A.

    1995-01-01

    The specified phase stability of the CEBAF RF distribution system is 2.9 degree rms per linac. Stability is achieved through the use of a temperature and pressure regulated coaxial drive line. Purpose of the fiber optic phase reference system is to monitor the relative phase at the beginning and ending of this drive line, between linacs, injector and separator to determine drift due to ambient temperature fluctuations. The system utilizes an Ortel 1310 nm single mode laser driving Sumitumo optical fiber to distribute a reference signal at 1497 MHz. Phase of this reference signal is compared to the 1427 MHz (LO) and the 70 MHz (IF) via a 360 degree phase detector. The detected information is then routed to the CEBAF control system for display with a specified resolution of ±0.2 degree over a 20 degree phase delta

  16. Phase-Modulated Optical Communication Systems

    CERN Document Server

    Ho, Keang-Po

    2005-01-01

    Fiber-optic communication systems have revolutionized our telecommunication infrastructures – currently, almost all telephone land-line, cellular, and internet communications must travel via some form of optical fibers. In these transmission systems, neither the phase nor frequency of the optical signal carries information – only the intensity of the signal is used. To transmit more information in a single optical carrier, the phase of the optical carrier must be explored. As a result, there is renewed interest in phase-modulated optical communications, mainly in direct-detection DPSK signals for long-haul optical communication systems. When optical amplifiers are used to maintain certain signal level among the fiber link, the system is limited by amplifier noises and fiber nonlinearities. Phase-Modulated Optical Communication Systems surveys this newly popular area, covering the following topics: The transmitter and receiver for phase-modulated coherent lightwave systems Method for performance analysis o...

  17. Phase analysis of Fe-B-V system

    Czech Academy of Sciences Publication Activity Database

    Homolová, V.; Výrostková, A.; Čiripová, L.; Kroupa, Aleš

    2013-01-01

    Roč. 51, č. 2 (2013), s. 135-139 ISSN 0023-432X R&D Projects: GA ČR(CZ) GAP108/10/1908 Institutional support: RVO:68081723 Keywords : CALPHAD method * Fe-B-V system * phase diagram Subject RIV: BJ - Thermodynamics Impact factor: 0.546, year: 2013

  18. A nonlocal phase-field system with inertial term

    Czech Academy of Sciences Publication Activity Database

    Grasselli, M.; Petzeltová, Hana; Schimperna, G.

    2007-01-01

    Roč. 65, č. 3 (2007), s. 451-469 ISSN 0033-569X R&D Projects: GA AV ČR(CZ) IAA100190606 Institutional research plan: CEZ:AV0Z10190503 Keywords : nonlocal phase-field system * Lojasiewicz inequality * convergence to equilibria Subject RIV: BA - General Mathematics Impact factor: 0.463, year: 2007

  19. Passivity Based Stabilization of Non-minimum Phase Nonlinear Systems

    Czech Academy of Sciences Publication Activity Database

    Travieso-Torres, J.C.; Duarte-Mermoud, M.A.; Zagalak, Petr

    2009-01-01

    Roč. 45, č. 3 (2009), s. 417-426 ISSN 0023-5954 R&D Projects: GA ČR(CZ) GA102/07/1596 Institutional research plan: CEZ:AV0Z10750506 Keywords : nonlinear systems * stabilisation * passivity * state feedback Subject RIV: BC - Control Systems Theory Impact factor: 0.445, year: 2009 http://library.utia.cas.cz/separaty/2009/AS/zagalak-passivity based stabilization of non-minimum phase nonlinear systems.pdf

  20. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  1. RF phase distribution systems at the SLC

    International Nuclear Information System (INIS)

    Jobe, R.K.; Schwarz, H.D.

    1989-04-01

    Modern large linear accelerators require RF distribution systems with minimal phase drifts and errors. Through the use of existing RF coaxial waveguides, and additional installation of phase reference cables and monitoring equipment, stable RF distribution for the SLC has been achieved. This paper discusses the design and performance of SLAC systems, and some design considerations for future colliders. 6 refs., 4 figs

  2. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  3. Telecentric 3D profilometry based on phase-shifting fringe projection.

    Science.gov (United States)

    Li, Dong; Liu, Chunyang; Tian, Jindong

    2014-12-29

    Three dimensional shape measurement in the microscopic range becomes increasingly important with the development of micro manufacturing technology. Microscopic fringe projection techniques offer a fast, robust, and full-field measurement for field sizes from approximately 1 mm2 to several cm2. However, the depth of field is very small due to the imaging of non-telecentric microscope, which is often not sufficient to measure the complete depth of a 3D-object. And the calibration of phase-to-depth conversion is complicated which need a precision translation stage and a reference plane. In this paper, we propose a novel telecentric phase-shifting projected fringe profilometry for small and thick objects. Telecentric imaging extends the depth of field approximately to millimeter order, which is much larger than that of microscopy. To avoid the complicated phase-to-depth conversion in microscopic fringe projection, we develop a new system calibration method of camera and projector based on telecentric imaging model. Based on these, a 3D reconstruction of telecentric imaging is presented with stereovision aided by fringe phase maps. Experiments demonstrated the feasibility and high measurement accuracy of the proposed system for thick object.

  4. OC5 Project Phase II: Validation of Global Loads of the DeepCwind Floating Semisubmersible Wind Turbine

    DEFF Research Database (Denmark)

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.

    2017-01-01

    This paper summarizes the findings from Phase II of the Offshore Code Comparison, Collaboration, Continued, with Correlation project. The project is run under the International Energy Agency Wind Research Task 30, and is focused on validating the tools used for modeling offshore wind systems thro...

  5. Two-phase flow in refrigeration systems

    CERN Document Server

    Gu, Junjie; Gan, Zhongxue

    2013-01-01

    Two-Phase Flow in Refrigeration Systems presents recent developments from the authors' extensive research programs on two-phase flow in refrigeration systems. This book covers advanced mass and heat transfer and vapor compression refrigeration systems and shows how the performance of an automotive air-conditioning system is affected through results obtained experimentally and theoretically, specifically with consideration of two-phase flow and oil concentration. The book is ideal for university postgraduate students as a textbook, researchers and professors as an academic reference book, and b

  6. Cyprus natural analogue project (CNAP). Phase III final report

    International Nuclear Information System (INIS)

    Alexander, W.R.; Milodowski, A.E.; Pitty, A.F.

    2012-01-01

    The CNAP Phase III project was carried out following identification of the requirement to support ongoing laboratory and modelling efforts on the potential reaction of the bentonite buffer with cementitious leachates in the repository EBS. Although it is known that the higher pH (12.5 to 13) leachates from OPC cement will degrade bentonite, it is unclear if this will also be the case for the lower pH (10 to 11) leachates typical of low alkali cements. Ongoing laboratory and URL programmes which are currently investigating this face the obstacle of slow kinetics and the production of short-lived metastable phases, meaning obtaining unambiguous results may take decades. This is exacerbated by the limitations of the thermodynamic databases for minerals of interest to models of bentonite/low alkali cement leachate reaction. It was therefore decided to implement a focussed NA study on bentonite/low alkali cement leachate reaction to provide indications of likely long-term reaction products and reaction pathways to provide feedback on the existing short-term investigations noted above and to ascertain if any critical path R and D needs to be instigated now. The results of the analyses presented here suggest that there has been very limited alkaline groundwater reaction with the bentonite. This is generally supported by both the geomorphological evidence and the natural decay series data which imply groundwater groundwater/rock interaction in the last 10 5 a. When integrated with the novel data currently being produced in the BIGRAD project, the CNAP data tend to indicate that any long-term bentonite reaction in low alkali cement leachates is minimal. (orig.)

  7. Cyprus natural analogue project (CNAP). Phase III final report

    Energy Technology Data Exchange (ETDEWEB)

    Alexander, W R [Bedrock Geosciences, Auenstein (Switzerland); Milodowski, A E [British Geological Survey, Keyworth (United Kingdom); Pitty, A F [Pitty (EIA) Consulting, Norwich (United Kingdom)

    2012-01-15

    The CNAP Phase III project was carried out following identification of the requirement to support ongoing laboratory and modelling efforts on the potential reaction of the bentonite buffer with cementitious leachates in the repository EBS. Although it is known that the higher pH (12.5 to 13) leachates from OPC cement will degrade bentonite, it is unclear if this will also be the case for the lower pH (10 to 11) leachates typical of low alkali cements. Ongoing laboratory and URL programmes which are currently investigating this face the obstacle of slow kinetics and the production of short-lived metastable phases, meaning obtaining unambiguous results may take decades. This is exacerbated by the limitations of the thermodynamic databases for minerals of interest to models of bentonite/low alkali cement leachate reaction. It was therefore decided to implement a focussed NA study on bentonite/low alkali cement leachate reaction to provide indications of likely long-term reaction products and reaction pathways to provide feedback on the existing short-term investigations noted above and to ascertain if any critical path R and D needs to be instigated now. The results of the analyses presented here suggest that there has been very limited alkaline groundwater reaction with the bentonite. This is generally supported by both the geomorphological evidence and the natural decay series data which imply groundwater groundwater/rock interaction in the last 10{sup 5} a. When integrated with the novel data currently being produced in the BIGRAD project, the CNAP data tend to indicate that any long-term bentonite reaction in low alkali cement leachates is minimal. (orig.)

  8. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  9. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  10. Guidance for the application of an assessment methodology for innovative nuclear energy systems. INPRO manual - Physical protection. Vol. 6 of the final report of phase 1 of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO)

    International Nuclear Information System (INIS)

    2008-11-01

    The International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was initiated in the year 2000, based on a resolution of the IAEA General Conference (GC(44)/RES/21). The main objectives of INPRO are (1) to help to ensure that nuclear energy is available to contribute in fulfilling energy needs in the 21st century in a sustainable manner, (2) to bring together both technology holders and technology users to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles; and (3) to create a forum to involve all relevant stakeholders that will have an impact on, draw from, and complement the activities of existing institutions, as well as ongoing initiatives at the national and international level. This document follows the guidelines of the INPRO report M ethodology for the assessment of innovative nuclear reactors and fuel cycles, Report of Phase 1B (first part) of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) , IAEA-TECDOC-1434 (2004), together with its previous report G uidance for the evaluation for innovative nuclear reactors and fuel cycles, Report of Phase 1A of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO), IAEATECDOC-1362 (2003). This INPRO manual is comprised of an overview volume and eight additional volumes covering the areas of economics (Volume 2), infrastructure (Volume 3), waste management (Volume 4), proliferation resistance (Volume 5), physical protection (Volume 6), environment (Volume 7), safety of reactors (Volume 8), and safety of nuclear fuel cycle facilities (Volume 9). The INPRO Manual for the area of physical protection (Volume 6) provides guidance to the assessor of an INS (innovative nuclear energy system) under a physical protection regime in a country that is planning to install a nuclear power program (or maintaining or enlarging an existing one), and describes the application of the

  11. Phase behavior and phase inversion for dispersant systems

    International Nuclear Information System (INIS)

    Solheim, A.; Brandvik, P.J.

    1991-06-01

    This report describes some preliminary phase behavior studies and phase inversion temperature measurements in seawater, bunker oil and dispersant. The objectives have been to find new ways of characterizing dispersants for dispersing oil spill at sea and, perhaps, to throw new lights on the mechanism of dispersion formation (oil-in-water emulsification). The work has been focussed on the relation to phase behavior and the existence of microemulsion in equilibrium with excess oil and water phases. The dispersing process is also compared to the recommended conditions for emulsion formation. When forming an oil-in-water emulsion in an industrial process, it is recommended to choose an emulsifier which gives a phase inversion temperature (PIT) which is 20 - 60 o C higher than the actual temperature for use. The emulsification process must take place close to the PIT which is the temperature at which the emulsion change from oil-in-water emulsion to water-in-oil emulsion when the system is stirred. This condition corresponds to the temperature where the phase behavior change character. The purpose has been to find out if the composition of the dispersants corresponds to the recommendations for oil-in-water emulsification. The amount of experimental work has been limited. Two kinds of experiments have been carried out. Phase behavior studies have been done for seawater, bunker oil and four different dispersants where one had an optimal composition. The phase behavior was hard to interpret and is not recommended for standard dispersants test. The other experimental technique was PIT-measurements by conductivity measurements versus temperature. 4 figs., 1 tab., 4 refs

  12. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  13. Status of JSFR development in phase I FaCT project

    International Nuclear Information System (INIS)

    Aoto, Kazumi; Chikazawa, Yoshitaka; Kotake, Shoji; Ito, Takaya

    2011-01-01

    The Fast Reactor Cycle Technology Development (FaCT) project is pursuing commercialization of fast reactor cycle system around 2050 under cooperation of MEXT (Ministry of Education, Culture, Sports, Science and Technology), METI (Ministry of Economy, Trade and Industry), utilities, venders and JAEA (Japan Atomic Energy Agency). As results of the FaCT Phase I, the key technologies for Japan Sodium-cooled Fast Reactor (JSFR) has been evaluated. (author)

  14. Phase Noise Compensation for OFDM Systems

    Science.gov (United States)

    Leshem, Amir; Yemini, Michal

    2017-11-01

    We describe a low complexity method for time domain compensation of phase noise in OFDM systems. We extend existing methods in several respects. First we suggest using the Karhunen-Lo\\'{e}ve representation of the phase noise process to estimate the phase noise. We then derive an improved datadirected choice of basis elements for LS phase noise estimation and present its total least square counterpart problem. The proposed method helps overcome one of the major weaknesses of OFDM systems. We also generalize the time domain phase noise compensation to the multiuser MIMO context. Finally we present simulation results using both simulated and measured phased noise. We quantify the tracking performance in the presence of residual carrier offset.

  15. Portable Data Acquisition System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Armstrong researchers have developed a portable data acquisition system (PDAT) that can be easily transported and set up at remote locations to display and archive...

  16. Facilities projects performance measurement system

    International Nuclear Information System (INIS)

    Erben, J.F.

    1979-01-01

    The two DOE-owned facilities at Hanford, the Fuels and Materials Examination Facility (FMEF), and the Fusion Materials Irradiation Test Facility (FMIT), are described. The performance measurement systems used at these two facilities are next described

  17. Modified scaling function projective synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Xu Yu-Hua; Zhou Wu-Neng; Fang Jian-An

    2011-01-01

    This paper investigates a kind of modified scaling function projective synchronization of uncertain chaotic systems using an adaptive controller. The given scaling function in the new method can be an equilibrium point, a periodic orbit, or even a chaotic attractor in the phase space. Based on LaSalle's invariance set principle, the adaptive control law is derived to make the states of two chaotic systems function projective synchronized. Some numerical examples are also given to show the effectiveness of the proposed method. (general)

  18. Blue laser phase change recording system

    International Nuclear Information System (INIS)

    Hofmann, Holger; Dambach, S.Soeren; Richter, Hartmut

    2002-01-01

    The migration paths from DVD phase change recording with red laser to the next generation optical disk formats with blue laser and high NA optics are discussed with respect to optical aberration margins and disc capacities. A test system for the evaluation of phase change disks with more than 20 GB capacity is presented and first results of the recording performance are shown

  19. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  20. Project management plan double-shell tank system specification development

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1998-01-01

    The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Energy (DOE) to support removal of wastes from the Hanford Site 200 Area tanks in two phases. The schedule for these phases allows focusing on requirements for the first phase of providing feed to the privatized vitrification plants. The Tank Waste Retrieval Division near-term goal is to focus on the activities to support Phase 1. These include developing an integrated (technical, schedule, and cost) baseline and, with regard to private contractors, establishing interface agreements, constructing infrastructure systems, retrieving and delivering waste feed, and accepting immobilized waste products for interim onsite storage. This document describes the process for developing an approach to designing a system for retrieving waste from double-shell tanks. It includes a schedule and cost account for the work breakdown structure task

  1. Thioaptamer Diagnostic System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — AM Biotechnologies (AM) will develop a diagnostic system in response to SBIR Topic X10.01 Reusable Diagnostic Lab Technology that will simultaneously detect and...

  2. Thioaptamer Diagnostic System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — AM Biotechnologies (AM) in partnership with Sandia National Laboratories will develop a Thioaptamer Diagnostic System (TDS) in response to Topic X10.01 Reusable...

  3. SOUL System Maturation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Busek Co. Inc. proposes to advance the maturity of an innovative Spacecraft on Umbilical Line (SOUL) System suitable for a wide variety of applications of interest...

  4. SOUL System Maturation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Busek Co. Inc. proposes to advance the maturity of an innovative Spacecraft on Umbilical Line (SOUL) System suitable for a wide variety of applications of interest...

  5. Structural Nervous System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — GTL's SNS technology aids in the operation of new or existing structural health monitoring (SHM) systems by integrating data and power pathways into the structure....

  6. Tactile Data Entry System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Building on our successful Phase I Tactile Data Entry program, Barron Associates proposes development of a Glove-Enabled Computer Operations (GECO) system to permit...

  7. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  8. Electronic construction collaboration system -- phase II.

    Science.gov (United States)

    2010-06-01

    During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) : and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom d...

  9. Geometric phases in discrete dynamical systems

    Energy Technology Data Exchange (ETDEWEB)

    Cartwright, Julyan H.E., E-mail: julyan.cartwright@csic.es [Instituto Andaluz de Ciencias de la Tierra, CSIC–Universidad de Granada, E-18100 Armilla, Granada (Spain); Instituto Carlos I de Física Teórica y Computacional, Universidad de Granada, E-18071 Granada (Spain); Piro, Nicolas, E-mail: nicolas.piro@epfl.ch [École Polytechnique Fédérale de Lausanne (EPFL), 1015 Lausanne (Switzerland); Piro, Oreste, E-mail: piro@imedea.uib-csic.es [Departamento de Física, Universitat de les Illes Balears, E-07122 Palma de Mallorca (Spain); Tuval, Idan, E-mail: ituval@imedea.uib-csic.es [Mediterranean Institute for Advanced Studies, CSIC–Universitat de les Illes Balears, E-07190 Mallorca (Spain)

    2016-10-14

    In order to study the behaviour of discrete dynamical systems under adiabatic cyclic variations of their parameters, we consider discrete versions of adiabatically-rotated rotators. Parallelling the studies in continuous systems, we generalize the concept of geometric phase to discrete dynamics and investigate its presence in these rotators. For the rotated sine circle map, we demonstrate an analytical relationship between the geometric phase and the rotation number of the system. For the discrete version of the rotated rotator considered by Berry, the rotated standard map, we further explore this connection as well as the role of the geometric phase at the onset of chaos. Further into the chaotic regime, we show that the geometric phase is also related to the diffusive behaviour of the dynamical variables and the Lyapunov exponent. - Highlights: • We extend the concept of geometric phase to maps. • For the rotated sine circle map, we demonstrate an analytical relationship between the geometric phase and the rotation number. • For the rotated standard map, we explore the role of the geometric phase at the onset of chaos. • We show that the geometric phase is related to the diffusive behaviour of the dynamical variables and the Lyapunov exponent.

  10. Entransy in phase-change systems

    CERN Document Server

    Gu, Junjie

    2014-01-01

    Entransy in Phase-Change Systems summarizes recent developments in the area of entransy, especially on phase-change processes. This book covers new developments in the area including the great potential for energy saving for process industries, decreasing carbon dioxide emissions, reducing energy bills and improving overall efficiency of systems. This concise volume is an ideal book for engineers and scientists in energy-related industries.

  11. Phase diagram of strongly correlated Fermi systems

    International Nuclear Information System (INIS)

    Zverev, M.V.; Khodel', V.A.; Baldo, M.

    2000-01-01

    Phase transitions in uniform Fermi systems with repulsive forces between the particles caused by restructuring of quasiparticle filling n(p) are analyzed. It is found that in terms of variables, i.e. density ρ, nondimensional binding constant η, phase diagram of a strongly correlated Fermi system for rather a wide class of interactions reminds of a puff-pastry pie. Its upper part is filled with fermion condensate, the lower one - with normal Fermi-liquid. They are separated by a narrow interlayer - the Lifshits phase, characterized by the Fermi multibound surface [ru

  12. Phase unwrapping algorithm based on multi-frequency fringe projection and fringe background for fringe projection profilometry

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Gu, Feifei; Ma, Yueyang

    2015-01-01

    A phase unwrapping algorithm specially designed for the phase-shifting fringe projection profilometry (FPP) is proposed. It combines a revised dual-frequency fringe projectionalgorithm and a proposed fringe background based quality guided phase unwrapping algorithm (FB-QGPUA). Phase demodulated from the high-frequency fringe patterns is partially unwrapped by that demodulated from the low-frequency ones. Then FB-QGPUA is adopted to further unwrap the partially unwrapped phase. Influences of the phase error on the measurement are researched. Strategy to select the fringe pitch is given. Experiments demonstrate that the proposed method is very robust and efficient. (paper)

  13. Coal-fired MHD combustor development project: Phase 3D

    Science.gov (United States)

    1985-05-01

    This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase 3D) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.

  14. Gamma-ray CT from incomplete projections for two-phase pipe flow.

    Science.gov (United States)

    Xin, S; Wang, H X

    2017-02-01

    A low-energy low-dose γ-ray computed tomography (CT) system used in the gas-liquid two-phase pipe flow measurement has been studied at Tianjin University in recent years. The γ-ray CT system, having a third-generation X-ray CT scanning configuration, is comprised of one 300mCi 241 Am source and 17 CdZnTe detector units and achieves a spatial image resolution of about 7 mm. It is primarily intended to measure the two-phase pipe flow and provide improvement suggestions for industrial CT system. Recently we improve the design for image reconstruction from incomplete projection to optimize the scanning parameters and reduce the radiation dose. First, tomographic problem from incomplete projections is briefly described. Next, a system structure and a hardware circuit design are listed and explained, especially on time parameter setting of the pulse shaper. And then a detailed system analysis is provided in Section II, mainly focusing on spatial resolution, temporal resolution, system noise, and imaging algorithm. Finally, we carry on necessary static and dynamic experiments in a full scan (360°) and two sets of partial scan reconstruction tests to determine the feasibility of this γ-ray CT system for reconstructing the images from insufficient projections. And based on an A-variable algebraic reconstruction technique method, a specially designed algorithm, we evaluate the system performance and noise level of this CT system working quantitatively and qualitatively. Results of dynamic test indicate that the acceptable results can be acquired using a multi-source γ-ray CT system with the same parameters when the flow rate is less than 0.04 m/s and the imaging speed is slower than 33 frames/s.

  15. DIstributed VIRtual System (DIVIRS) Project

    Science.gov (United States)

    Schorr, Herbert; Neuman, B. Clifford; Gaines, Stockton R.; Mizell, David

    1996-01-01

    The development of Prospero moved from the University of Washington to ISI and several new versions of the software were released from ISI during the contract period. Changes in the first release from ISI included bug fixes and extensions to support the needs of specific users. Among these changes was a new option to directory queries that allows attributes to be returned for all files in a directory together with the directory listing. This change greatly improves the performance of their server and reduces the number of packets sent across their trans-pacific connection to the rest of the internet. Several new access method were added to the Prospero file method. The Prospero Data Access Protocol was designed, to support secure retrieval of data from systems running Prospero.

  16. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    Energy Technology Data Exchange (ETDEWEB)

    Gasper, John R. [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory; Wigmosta, Mark S. [PNNL; Voisin, Nathalie [PNNL; Rakowski, Cynthia [PNNL; Coleman, Andre [PNNL; Lowry, Thomas S. [SNL

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  17. Photon detection system for ProtoDUNE dual phase

    CERN Document Server

    Cuesta, C. (on behalf of DUNE collaboration)

    2017-01-01

    The Deep Underground Neutrino Experiment (DUNE) is a 40-kton underground liquid argon time-projection-chamber (LAr TPC) detector, for long-baseline neutrino oscillation studies and for neutrino astrophysics and nucleon decay searches. Photon detector systems embedded within the LAr TPC add precise timing capabilities for non-beam events. The ProtoDUNE dual phase detector will consist of a 6x6x6 m3 liquid argon time-projection chamber placed at CERN and the light readout will be formed by 8-inch cryogenic photomultipliers from Hamamatsu. The characterization of the 36 photomultipliers, the base design, and the light calibration system are described. In addition, preliminary results from a 3x1x1 m3 LAr double phase detector operating at CERN are presented.

  18. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  19. Advanced Petroleum-Based Fuels -- Diesel Emissions Control Project (APBF-DEC): Lubricants Project, Phase 2 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    2006-06-01

    This report summarizes the results of the second phase of a lubricants project, which investigated the impact of engine oil formulation on diesel vehicle emissions and the performance of a nitrogen oxide adsorber catalyst (NAC).

  20. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  1. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  2. Oscillating systems with cointegrated phase processes

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Rahbek, Anders; Ditlevsen, Susanne

    2017-01-01

    We present cointegration analysis as a method to infer the network structure of a linearly phase coupled oscillating system. By defining a class of oscillating systems with interacting phases, we derive a data generating process where we can specify the coupling structure of a network...... that resembles biological processes. In particular we study a network of Winfree oscillators, for which we present a statistical analysis of various simulated networks, where we conclude on the coupling structure: the direction of feedback in the phase processes and proportional coupling strength between...... individual components of the system. We show that we can correctly classify the network structure for such a system by cointegration analysis, for various types of coupling, including uni-/bi-directional and all-to-all coupling. Finally, we analyze a set of EEG recordings and discuss the current...

  3. Oman Drilling Project Phase I Borehole Geophysical Survey

    Science.gov (United States)

    Matter, J. M.; Pezard, P. A.; Henry, G.; Brun, L.; Célérier, B.; Lods, G.; Robert, P.; Benchikh, A. M.; Al Shukaili, M.; Al Qassabi, A.

    2017-12-01

    The Oman Drilling Project (OmanDP) drilled six holes at six sites in the Samail ophiolite in the southern Samail and Tayin massifs. 1500-m of igneous and metamorphic rocks were recovered at four sites (GT1, GT2, GT3 and BT1) using wireline diamond core drilling and drill cuttings at two sites (BA1, BA2) using air rotary drilling, respectively. OmanDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, NASA, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, and with in-kind support in Oman from Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University and the German University of Technology. A comprehensive borehole geophysical survey was conducted in all the OmanDP Phase I boreholes shortly after drilling in April 2017. Following geophysical wireline logs, using slim-hole borehole logging equipment provided and run by the Centre National De La Recherche Scientifique (CNRS) and the Université de Montpellier/ Géosciences Montpellier, and logging trucks from the Ministry of Regional Municipalities and Water Resources, were collected in most of the holes: electrical resistivity (dual laterolog resistivity, LLd and LLs), spectral gamma ray (K, U, and Th contents), magnetic susceptibility, total natural gamma ray, full waveform sonic (Vp and Vs), acoustic borehole wall imaging, optical borehole wall imaging, borehole fluid parameters (pressure, temperature, electrical conductivity, dissolved oxygen, pH, redox potential, non-polarized spontaneous electrical potential), and caliper (borehole diameter). In addition, spinner flowmeter (downhole fluid flow rate along borehole axis) and heatpulse flow meter logs (dowhole fluid flow rate along borehole axis) were collected in BA1 to characterize downhole fluid flow rates along borehole axis. Unfortuantely, only incomplete wireline logs are available for

  4. Soboba Community Energy Solar ProjectPhase 1

    Energy Technology Data Exchange (ETDEWEB)

    Castello, Michael [Soboba Band of Luiseno Indians, San Jacinto, CA (United States); DeForge, Deborah [Soboba Band of Luiseno Indians, San Jacinto, CA (United States); Estrada, Steven [Soboba Band of Luiseno Indians, San Jacinto, CA (United States)

    2017-03-29

    Arms are decided by the elected council. The Soboba Tribal Administration encompasses several departments that serve the needs of the Tribe, the Reservation and the general public. They assist in day-to-day Tribal operations, public safety, Tribal family services, Native American assistance to needy families, cultural preservation, and Tribal environmental protection of natural resources, along with the monitoring of progress and needs of its Enterprises and the general public. The Tribe’s long term energy vision is to become self-sufficient and thereby attain greater control of its destiny, to control costs in view of rapidly rising electric utility expenses, and to maximize the use of renewable energy consistent with sustainable development practices. The project is a Renewable Energy System, specifically a ground mounted, fixed tilt, solar photovoltaic (PV) generating system with a rated capacity of 1.0MWac. The solar generated power serves the electric needs of the affected meters. It benefits every Tribal member since the cost of running the community Tribal facilities, including electric bills, comes out of the General Fund. The estimated 20 year project savings of $ 6,418,064 can be re-directed to other vital community needs, and the project will provide additional jobs for Tribal members. The project has been thoroughly researched and is ready to implement as soon as funding is approved.

  5. Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-08-01

    without having a holistic monitoring system in Iraq. It was also deduced that the most important source of project failure is not allocating enough time to the planning phase. Some other recommendations and suggestions for future studies were made also.

  6. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  7. The international Stripa Project, executive summary of phase 2

    International Nuclear Information System (INIS)

    1989-12-01

    The Second Phase of the Stripa Project included the continued development of methods and techniques for repository site investigations. The crosshole investigations demonstrated that it is possible to characterize fractures in crystalline rock with a reliability and realism not obtained before. At the investigated site at Stripa, it was shown that groundwater flow is concentrated within a few major fractures. The main features were considered to be broadly planar, containing patches of high and low hydraulic conductivity. The migration experiment demonstrated that the groundwater flow could be very unevenly distributed in the rock. Together with the tritium measurements it also gave strong support to the notion that a non-negligible portion of the flow takes place in channels which have little contact with other main channels. It is indicated that a new type of solute source must be considered - fluid inclusions in the host rock. At Stripa, the age of the solutes is likely to be hundreds of millions of years older than the groundwaters. Furthermore, this source contributes the largest portion of the total porosity. Although fluid inclusions are considered to be a residual or non-flow porosity, it could become part of the flow porosity through microfracturing brought about by changing stress fields. Sealing and redirection of the groundwater flow away from man made openings in the rock was tested at Stripa and found to be feasible as shown in the various plugging and sealing experiments. The use of Na bentonite in the form of suitably shaped blocks of highly compacted powder has been found to be very practical for sealing off boreholes, shafts and tunnels in repositories. The clay forms a tight, integrated contact with the rock, so that water flow along the rock contact is hindered. The compressibility and expandability of the clay means that this tight contact is preserved even if slight rock displacements occur. (J.P.N.)

  8. The International intraval project. Phase 1 test cases

    International Nuclear Information System (INIS)

    1992-01-01

    This report contains a description of the test cases adopted in Phase 1 of the international cooperation project INTRAVAL. Seventeen test cases based on bench-scale experiments in laboratory, field tests and natural analogue studies, have been included in the study. The test cases are described in terms of experimental design and types of available data. In addition, some quantitative examples of available data are given as well as references to more extensive documentation of the experiments on which the test cases are based. Fithteen test cases examples are given: 1 Mass transfer through clay by diffusion and advection. 2 Uranium migration in crystalline bore cores, small scale pressure infiltration experiments. 3 Radionuclide migration in single natural fractures in granite. 4 Tracer tests in a deep basalt flow top. 5 Flow and tracer experiment in crystalline rock based on the Stripa 3-D experiment. 6 Tracer experiment in a fracture zone at the Finnsjon research area. 7 Synthetic data base, based on single fracture migration experiments in Grimsel rock laboratory. 8 Natural analogue studies at Pocos de Caldas, Minais Gerais, Brazil. Redox-front and radionuclide movement in an open pit uranium mine. 9 Natural analogue studies at the Koongarra site in the Alligator Rivers area of the Northern Territory, Australia. 10 Large block migration experiments in a block of crystalline rock. 11 Unsaturated flow and transport experiments performed at Las Cruces, New Mexico. 12 Flow and transport experiment in unsaturated fractured rock performed at the Apache Leap Tuff site, Arizona. 13 Experiments in partially saturated tuffaceous rocks performed in the G-tunnel underground facility at the Nevada Test site, USA. 14 Experimental study of brine transport in porous media. 15 Groundwater flow in the vicinity of the Gorleben Salt Dome, Federal Republic of Germany

  9. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  10. Materials information for science and technology (MIST): Project overview: Phases I and II and general considerations

    Energy Technology Data Exchange (ETDEWEB)

    Grattidge, W.; Westbrook, J.; McCarthy, J.; Northrup, C. Jr.; Rumble, J. Jr.

    1986-01-01

    This report documents the initial phases of the Materials Information for Science and Technology (MIST) project jointly supported by the Department of Energy and the National Bureau of Standards. The purpose of MIST is to demonstrate the power and utility of computer access to materials property data. The initial goals include: to exercise the concept of a computer network of materials databases and to build a demonstration of such a system suitable for use as the core of operational systems in the future. Phases I and II are described in detail herein. In addition, a discussion is given of the expected usage of the system. The primary MIST prototype project is running on an IBM 3084 under STS at the Stanford University's Information Technology Services (ITS). Users can access the Stanford system via ARPANET, TELENET, and TYMNET, as well as via commercial telephone lines. For fastest response time and use of the full screen PRISM interface, direct connection using a 2400 baud modem with the MNP error-correcting protocol over standard telephone lines gives the best results - though slower speed connections and a line-oriented interface are also available. This report gives detailed plans regarding the properties to be enterend and the materials to be entered into the system.

  11. Solar central receiver hybrid power system. Phase I study

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-11-01

    A management plan is presented for implementation during the Solar Central Receiver Hybrid Power System - Phase I study project. The project plan and the management controls that will be used to assure technically adequate, timely and cost effective performance of the work required to prepare the designated end products are described. Bechtel in-house controls and those to be used in directing the subcontractors are described. Phase I of the project consists of tradeoff studies, parametric analyses, and engineering studies leading to conceptual definition and evaluation of a commercial hybrid power system that has the potential for supplying economically competitive electric power to a utility grid in the 1985-1990 time frame. The scope also includes the preparation of a development plan for the resolution of technical uncertainties and the preparation of plans and a proposal for Phase II of the program. The technical approach will be based on a central receiver solar energy collection scheme which supplies thermal energy to a combined cycle, generating system, consisting of a gas turbine cycle combined with a steam bottoming cycle by means of a heat recovery steam generator.

  12. HPT Clearance Control: Intelligent Engine Systems-Phase 1

    Science.gov (United States)

    2005-01-01

    The following work has been completed to satisfy the Phase I Deliverables for the "HPT Clearance Control" project under NASA GRC's "Intelligent Engine Systems" program: (1) Need for the development of an advanced HPT ACC system has been very clearly laid out, (2) Several existing and potential clearance control systems have been reviewed, (3) A scorecard has been developed to document the system, performance (fuel burn, range, payload, etc.), thermal, and mechanical characteristics of the existing clearance control systems, (4) Engine size and flight cycle selection for the advanced HPT ACC system has been reviewed with "large engine"/"long range mission" combination showing the most benefit, (5) A scoring criteria has been developed to tie together performance parameters for an objective, data driven comparison of competing systems, and (6) The existing HPT ACC systems have been scored based on this scoring system.

  13. Setup and organisation of a NDA-system procurement project

    International Nuclear Information System (INIS)

    Botte, John; Gielen, Paul

    2007-01-01

    Belgoprocess is momentarily in the process of purchasing its fifth NDA-system. Measurement systems are, although based on general designs, not from the shelf items but tailor-made sophisticated and highly automated devices. It is obvious that such a project cannot be carried out by solely a NDA team, but needs a multifunctional team. This team combines NDA expertise with experts in civil works, electrical and mechanical engineering, procurement, IT, safety and legal administration. From less positive experiences in the past, Belgoprocess learned a lot and has now a systematic in place. This systematic structures the project from definition of requirements to operation, a two to three year process. This paper defines the phases of a NDA project and gives for each phase some do's and don'ts. A second subject is the writing and handling of the vast but needed and required documentation. It gives a brief overview of the over thirty documents and files needed. The described, integrated and formal approach reduces the risk of failing projects, systems not meeting the expectations or denied qualification. It puts clear agreements in place, smoothening the relationship between company, supplier and authorities. (authors)

  14. Code of Conduct for wind-power projects - Phase 3; Code of Conduct fuer windkraftprojekte. Phase 3 Machbarkeit und Strategie

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-11-15

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  15. National Geoscience Data Repository System: Phase 2 final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The American Geological Institute (AGI) has completed Phase 2 of a project to establish a National Geoscience Data Repository System (NGDRS). The project`s primary objectives are to preserve geoscience data in jeopardy of being destroyed and to make that data available to those who have a need to use it in future investigations. These data are available for donation to the public as a result of the downsizing that has occurred in the major petroleum and mining companies in the US for the past decade. In recent years, these companies have consolidated domestic operations, sold many of their domestic properties and relinquished many of their leases. The scientific data associated with those properties are no longer considered to be useful assets and are consequently in danger of being lost forever. The national repository project will make many of these data available to the geoscience community for the first time. Phase 2 encompasses the establishment of standards for indexing and cataloging of geoscience data and determination of the costs of transferring data from the private sector to public-sector data repositories. Pilot projects evaluated the feasibility of the project for transfer of different data types and creation of a Web-based metadata supercatalog and browser. Also as part of the project, a national directory of geoscience data repositories was compiled to assess what data are currently available in existing facilities. The next step, Phase 3, will focus on the initiation of transfer of geoscience data from the private sector to the public domain and development of the web-based Geotrek metadata supercatalog.

  16. Final report on the surface-based investigation phase (phase 1) at the Mizunami Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Matsuoka, Toshiyuki

    2011-03-01

    The Mizunami Underground Research Laboratory (MIU) Project is a comprehensive research project investigating the deep underground environment within crystalline rock being conducted by Japan Atomic Energy Agency at Mizunami City in Gifu Prefecture, central Japan and its role is defined in 'Framework for Nuclear Energy Policy' by Japan Atomic Energy Commission. The MIU Project has three overlapping phases: Surface-based Investigation phase (Phase I), Construction phase (Phase II), and Operation phase (Phase III), with a total duration of 20 years. The overall project goals of the MIU Project from Phase I through to Phase III are: 1) to establish techniques for investigation, analysis and assessment of the deep geological environment, and 2) to develop a range of engineering for deep underground application. During Phase I, the overall project goals were supported by Phase I goals. For the overall project goals 1), the Phase I goals were set to construct models of the geological environment from all surface-based investigation results that describe the geological environment prior to excavation and predict excavation response. For the overall project goals 2), the Phase I goals were set to formulate detailed design concepts and a construction plan for the underground facilities. This report summarizes the Phase I investigation which was completed in March 2005. The authors believe this report will make an important milestone, since this report clarifies how the Phase I goals are achieved and evaluate the future issues thereby direct the research which will be conducted during Phase II. With regard to the overall project goals 1), 'To establish techniques for investigation, analysis and assessment of the deep geological environment,' a step-wise investigation was conducted by iterating investigation, interpretation, and assessment, thereby understanding of geologic environment was progressively and effectively improved with progress of investigation. An optimal

  17. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  18. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  19. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  20. Reflecting on the challenges of building a rich interconnected metadata database to describe the experiments of phase six of the coupled climate model intercomparison project (CMIP6) for the Earth System Documentation Project (ES-DOC) and anticipating the opportunities that tooling and services based on rich metadata can provide.

    Science.gov (United States)

    Pascoe, C. L.

    2017-12-01

    The Coupled Model Intercomparison Project (CMIP) has coordinated climate model experiments involving multiple international modelling teams since 1995. This has led to a better understanding of past, present, and future climate. The 2017 sixth phase of the CMIP process (CMIP6) consists of a suite of common experiments, and 21 separate CMIP-Endorsed Model Intercomparison Projects (MIPs) making a total of 244 separate experiments. Precise descriptions of the suite of CMIP6 experiments have been captured in a Common Information Model (CIM) database by the Earth System Documentation Project (ES-DOC). The database contains descriptions of forcings, model configuration requirements, ensemble information and citation links, as well as text descriptions and information about the rationale for each experiment. The database was built from statements about the experiments found in the academic literature, the MIP submissions to the World Climate Research Programme (WCRP), WCRP summary tables and correspondence with the principle investigators for each MIP. The database was collated using spreadsheets which are archived in the ES-DOC Github repository and then rendered on the ES-DOC website. A diagramatic view of the workflow of building the database of experiment metadata for CMIP6 is shown in the attached figure.The CIM provides the formalism to collect detailed information from diverse sources in a standard way across all the CMIP6 MIPs. The ES-DOC documentation acts as a unified reference for CMIP6 information to be used both by data producers and consumers. This is especially important given the federated nature of the CMIP6 project. Because the CIM allows forcing constraints and other experiment attributes to be referred to by more than one experiment, we can streamline the process of collecting information from modelling groups about how they set up their models for each experiment. End users of the climate model archive will be able to ask questions enabled by the

  1. GPS synchronized power system phase angle measurements

    Science.gov (United States)

    Wilson, Robert E.; Sterlina, Patrick S.

    1994-09-01

    This paper discusses the use of Global Positioning System (GPS) synchronized equipment for the measurement and analysis of key power system quantities. Two GPS synchronized phasor measurement units (PMU) were installed before testing. It was indicated that PMUs recorded the dynamic response of the power system phase angles when the northern California power grid was excited by the artificial short circuits. Power system planning engineers perform detailed computer generated simulations of the dynamic response of the power system to naturally occurring short circuits. The computer simulations use models of transmission lines, transformers, circuit breakers, and other high voltage components. This work will compare computer simulations of the same event with field measurement.

  2. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  3. Software qualification for digital safety system in KNICS project

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Dong-Young; Choi, Jong-Gyun

    2012-01-01

    In order to achieve technical self-reliance in the area of nuclear instrumentation and control, the Korea Nuclear Instrumentation and Control System (KNICS) project had been running for seven years from 2001. The safety-grade Programmable Logic Controller (PLC) and the digital safety system were developed by KNICS project. All the software of the PLC and digital safety system were developed and verified following the software development life cycle Verification and Validation (V and V) procedure. The main activities of the V and V process are preparation of software planning documentations, verification of the Software Requirement Specification (SRS), Software Design Specification (SDS) and codes, and a testing of the software components, the integrated software, and the integrated system. In addition, a software safety analysis and a software configuration management are included in the activities. For the software safety analysis at the SRS and SDS phases, the software Hazard Operability (HAZOP) was performed and then the software fault tree analysis was applied. The software fault tree analysis was applied to a part of software module with some critical defects identified by the software HAZOP in SDS phase. The software configuration management was performed using the in-house tool developed in the KNICS project. (author)

  4. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  5. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  6. 76 FR 12354 - Cumberland System of Projects

    Science.gov (United States)

    2011-03-07

    ... Third Scenario--Return to Original Marketing Policy Inside TVA Preference Customers Capacity and Base.... Discussion: The marketing policy for the Cumberland System of Projects provides peaking capacity, along with 1500 hours of energy annually with each kilowatt of capacity, to customers outside the Tennessee Valley...

  7. Digital detection systems for projection radiography

    International Nuclear Information System (INIS)

    Schulz, R.F.

    2001-01-01

    This article gives a survey of digital X-ray detection systems for projection radiography. The different principles are compared and some general characteristics are derived. The basic conversion mechanisms in the absorption layers are described. The basic principles of solid state X-ray detectors and their general characteristics are elucidated as well as some similarities with detectors for computed tomography. Some important application and system aspects are considered. An outlook on further possible developments in this field is given. (orig.) [de

  8. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  9. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  10. 105-B Reactor museum feasibility assessment (Phase 2) project

    International Nuclear Information System (INIS)

    Heckel, R. P.

    2000-01-01

    This 105-B Reactor Museum feasibility assessment project report documents project activities that have been performed, including a review and assessment of previously existing information, a walk-through of the facility, an assessment of potential hazards, and selection of mitigative measures deemed to be appropriate to allow unescorted access by members of the public to a specified primary tour route

  11. Integrated Computational System for Electrochemical Device Design and Simulation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — During the Phase I project, major portions of a base, open-source, easily extensible battery modeling system have been developed with a modern, modular architecture...

  12. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  13. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  14. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  15. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  16. Individualized In-Service Teacher Education. (Project IN-STEP). Evaluation Report, Phase II.

    Science.gov (United States)

    Thurber, John C.

    Phase 2 of Project IN-STEP was conducted to revise, refine, and conduct further field testing of a new inservice teacher education model. The method developed (in Phase 1--see ED 003 905 for report) is an individualized, multi-media approach. Revision activities, based on feedback provided for Phase 1, include the remaking of six videotape…

  17. A strategic plan for the second phase (2013-2015) of the Korea biobank project.

    Science.gov (United States)

    Park, Ok; Cho, Sang Yun; Shin, So Youn; Park, Jae-Sun; Kim, Jun Woo; Han, Bok-Ghee

    2013-04-01

    The Korea Biobank Project (KBP) was led by the Ministry of Health and Welfare to establish a network between the National Biobank of Korea and biobanks run by university-affiliated general hospitals (regional biobanks). The Ministry of Health and Welfare started the project to enhance medical and health technology by collecting, managing, and providing researchers with high-quality human bioresources. The National Biobank of Korea, under the leadership of the Ministry of Health and Welfare, collects specimens through various cohorts and regional biobanks within university hospitals gather specimens from patients. The project began in 2008, and the first phase ended in 2012, which meant that there needed to be a plan for the second phase that begins in 2013. Consequently, professionals from within and outside the project were gathered to develop a plan for the second phase. Under the leadership of the planning committee, six working groups were formed to formulate a practical plan. By conducting two workshops with experts in the six working groups and the planning committee and three forums in 2011 and 2012, they have developed a strategic plan for the second phase of the KBP. This document presents a brief report of the second phase of the project based on a discussion with them. During the first phase of the project (2008-2012), a network was set up between the National Biobank of Korea and 17 biobanks at university-affiliated hospitals in an effort to unify informatics and governance among the participating biobanks. The biobanks within the network manage data on their biospecimens with a unified Biobank Information Management System. Continuous efforts are being made to develop a common standard operating procedure for resource collection, management, distribution, and personal information security, and currently, management of these data is carried out in a somewhat unified manner. In addition, the KBP has trained and educated professionals to work within the

  18. Cost effective solutions for field development. System supplier approach to projects and operations

    International Nuclear Information System (INIS)

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  19. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  20. California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Glen; Atkinson, Barbara; Rhyne, Ivin

    2009-09-09

    Wastewater treatment is an energy-intensive process and electricity demand is especially high during the utilities summer peak electricity demand periods. This makes wastewater treatment facilities prime candidates for demand response programs. However, wastewater treatment is often peripheral to food processing operations and its demand response opportunities have often been overlooked. Phase I of this wastewater demonstration project monitored wastewater energy and environmental data at Bell-Carter Foods, Inc., California's largest olive processing plant. For this monitoring activity the project team used Green Energy Management System (GEMS) automated enterprise energy management (EEM) technologies. This report presents results from data collected by GEMS from September 15, 2008 through November 30, 2008, during the olive harvest season. This project established and tested a methodology for (1) gathering baseline energy and environmental data at an industrial food-processing plant and (2) using the data to analyze energy efficiency, demand response, daily peak load management, and environmental management opportunities at the plant. The Phase I goals were to demonstrate the measurement and interrelationship of electricity demand, electricity usage, and water quality metrics and to estimate the associated CO{sub 2} emissions.

  1. The MYRRHA ADS Project in Belgium Enters the Front End Engineering Phase

    International Nuclear Information System (INIS)

    De Bruyn, D.; Ait Abderrahim, H.; Baeten, P.; Leysen, P.

    2015-01-01

    The MYRRHA project started in 1998 by SCK.CEN. MYRRHA is a MTR, based on the ADS concept, for material and fuel research, for studying the feasibility of transmutation of minor actinides and long-lived fission products arising from radioactive waste reprocessing and finally for demonstrating at a reasonable power scale the principle of the ADS. The MYRRHA design has progressed through various framework programmes of the European Commission in the context of Partitioning and Transmutation. The design has now entered into the Front End Engineering Phase (FEED) covering the period 2012- 2015. The engineering company, which will handle this phase, has been selected and the works have begun in the late 2013. In the meantime we have made some refinements in both primary systems and plant layout, including reactor building design. In this paper, we present the most recent developments of the MYRRHA design in terms of reactor building and plant layout as existing today. (authors)

  2. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  3. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  4. Final report on the maintenance asset management project : phase II.

    Science.gov (United States)

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  5. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  6. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  7. Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground

    Science.gov (United States)

    Newman, Walter S.; Fairbridge, Rhodes W.

    This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sea-level regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of “Project NOAH”.

  8. Phase transition signals of finite systems

    International Nuclear Information System (INIS)

    Duflot-Flandrois, Veronique

    2001-01-01

    Phase transitions are universal properties of interacting matter. They are well described if the considered system is infinite, by using standard thermodynamics. But in the case of small systems like atomic nuclei, this formalism cannot be applied anymore. Our aim is to propose a statistical mechanics approach in order to define the thermodynamical features of small open systems subject to non-saturating forces. We concentrate in particular on the definition and characterization for such systems of phase transitions belonging to the liquid gas universality class. Theoretical and experimental observables are defined to signal the occurrence and the order of this transition without any ambiguity. One of the most relevant and experimentally accessible observables consists in the study of kinetic energy fluctuations for a fixed value of the total deposited energy. In a first order phase transition such fluctuations become anomaly high and at the same time the size distribution appears to behave critically. All our results are obtained within numerical simulations of the lattice gas model with a nearest neighbors attractive interaction. Finally we check the influence of non-saturating forces, developing the specific example of the Coulomb interaction in the nucleus. Future improvements and perspectives at this work consist in the analysis of specific effects occurring in nuclei: isospin and quantum mechanics. (author) [fr

  9. Application of Ab Initio Electronic Structure Calculations in Construction of Phase Diagrams of Metallic Systems with Complex Phases

    Czech Academy of Sciences Publication Activity Database

    Šob, Mojmír; Kroupa, Aleš; Pavlů, Jana; Vřešťál, Jan

    2009-01-01

    Roč. 150, č. 1 (2009), s. 1-28 ISSN 1012-0394 R&D Projects: GA MŠk OC 147; GA ČR GA106/07/1078 Institutional research plan: CEZ:AV0Z20410507 Keywords : Ab initio calculations * CALPHAD method * Laves phases * sigma phase * ternary systems * super-austenitic steels Subject RIV: BM - Solid Matter Physics ; Magnetism

  10. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  11. The GEM Detector projective alignment simulation system

    International Nuclear Information System (INIS)

    Wuest, C.R.; Belser, F.C.; Holdener, F.R.; Roeben, M.D.; Paradiso, J.A.; Mitselmakher, G.; Ostapchuk, A.; Pier-Amory, J.

    1993-01-01

    Precision position knowledge (< 25 microns RMS) of the GEM Detector muon system at the Superconducting Super Collider Laboratory (SSCL) is an important physics requirement necessary to minimize sagitta error in detecting and tracking high energy muons that are deflected by the magnetic field within the GEM Detector. To validate the concept of the sagitta correction function determined by projective alignment of the muon detectors (Cathode Strip Chambers or CSCs), the basis of the proposed GEM alignment scheme, a facility, called the ''Alignment Test Stand'' (ATS), is being constructed. This system simulates the environment that the CSCs and chamber alignment systems are expected to experience in the GEM Detector, albeit without the 0.8 T magnetic field and radiation environment. The ATS experimental program will allow systematic study and characterization of the projective alignment approach, as well as general mechanical engineering of muon chamber mounting concepts, positioning systems and study of the mechanical behavior of the proposed 6 layer CSCs. The ATS will consist of a stable local coordinate system in which mock-ups of muon chambers (i.e., non-working mechanical analogs, representing the three superlayers of a selected barrel and endcap alignment tower) are implemented, together with a sufficient number of alignment monitors to overdetermine the sagitta correction function, providing a self-consistency check. This paper describes the approach to be used for the alignment of the GEM muon system, the design of the ATS, and the experiments to be conducted using the ATS

  12. Horonobe Underground Research Laboratory project. Synthesis of phase II (construction phase) investigations to a depth of 350 m

    International Nuclear Information System (INIS)

    Sato, Toshinori; Sasamoto, Hiroshi; Ishii, Eiichi; Matsuoka, Toshiyuki; Hayano, Akira; Miyakawa, Kazuya; Fujita, Tomoo; Tanai, Kenji; Nakayama, Masashi; Takeda, Masaki; Yokota, Hideharu; Aoyagi, Kazuhei; Ohno, Hirokazu; Shigeta, Naotaka; Hanamuro, Takahiro; Ito, Hiroaki

    2017-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. This report summarizes the results of the Phase II investigations carried out from April 2005 to June 2014 to a depth of 350 m. Integration of work from different disciplines into a 'geosynthesis' ensures that the Phase II goals have been successfully achieved and identifies key issues that need to be addressed in the Phase II investigations. Efforts are made to summarize as many lessons learnt from the Phase II investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. (author)

  13. Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-519. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  14. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  15. An optical ASK and FSK phase diversity transmission system

    Science.gov (United States)

    Vandenboom, H.; Vanetten, W.; Dekrom, W. H. C.; Vanbennekom, P.; Huijskens, F.; Niessen, L.; Deleijer, F.

    1992-12-01

    The results of a contribution to an electrooptical project for a 'phase diversity system', covering ASK and FSK (Amplitude and Frequency Shift Keying), are described. Specifications of subsystems, and tolerances and consequences of these tolerances for the final system performance, were derived. For the optical network of the phase diversity receiver, a manufacturing set up for three by three fused biconical taper fiber couplers was developed. In order to characterize planar optical networks, a set up was constructed to measure the phase relations at 1523 nm. The optical frequency of the local oscillator laser has to be locked on to the frequency of the received optical signal. This locking circuit is described. A complete optical three by three phase diversity transmission system was developed that can be used as a testbed for subsystems. The sensitivity of the receiver at a bit error rate of 10 to the minus 9th power is -47.2 dBm, which is 4.2 dB better than the value of the specifications.

  16. BOA: Asbestos pipe insulation removal robot system. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Schempf, H.; Bares, J.E.

    1995-02-01

    The project described in this report targets the development of a mechanized system for safe, cost-efficient and automated abatement of asbestos containing materials used as pipe insulation. Based on several key design criteria and site visits, a proof-of-concept prototype robot system, dubbed BOA, was designed and built, which automatically strips the lagging and insulation from the pipes, and encapsulates them under complete vacuum operation. The system can operate on straight runs of piping in horizontal or vertical orientations. Currently we are limited to four-inch diameter piping without obstacles as well as a somewhat laborious emplacement and removal procedure -- restrictions to be alleviated through continued development. BOA removed asbestos at a rate of 4-5 ft./h compared to 3 ft./h for manual removal of asbestos with a 3-person crew. The containment and vacuum system on BOA was able to achieve the regulatory requirement for airborne fiber emissions of 0.01 fibers/ccm/ 8-hr. shift. This program consists of two phases. The first phase was completed and a demonstration was given to a review panel, consisting of DOE headquarters and site representatives as well as commercial abatement industry representatives. Based on the technical and programmatic recommendations drafted, presented and discussed during the review meeting, a new plan for the Phase II effort of this project was developed. Phase 11 will consist of a 26-month effort, with an up-front 4-month site-, market-, cost/benefit and regulatory study before the next BOA robot (14 months) is built, and then deployed and demonstrated (3 months) at a DOE site (such as Fernald or Oak Ridge) by the beginning of FY`97.

  17. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment

  18. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  19. NEOShield-2 project: Phase effects in NEA visible spectra

    Science.gov (United States)

    Barucci, M. A.; Perna, D.; Belskaya, I.; Popescu, M.; Fornasier, S.; Doressoundiram, A.; Lantz, C.; Merlin, F.; Fulchignoni, M.

    2017-09-01

    One of the main objectives of the NEOShield-2 project, funded by European Commission (2015-2017) in the framework of the EU H2020 program, is to provide physical and compositional characterization of a large number of NEOs in the hundred-meter size range.

  20. Final report on the maintenance asset management project : phase I.

    Science.gov (United States)

    2012-07-01

    This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT res...

  1. Phase diagram of Pr-P system

    International Nuclear Information System (INIS)

    Mironov, K.E.

    1981-01-01

    An area of the Pr-P system, adjoining to the Pr ordinate, is plotted up by the DTA method. Presence of P solid solution in Pr is established. Data on thermal stability of PrP, PrP 2 , PrP 5 and PrP 7 are generalized. The diagram of phase transformations in Pr-P system is plotted up proceeding from the whole complex of the data, presented. A supposition is made on a possible formation of solid solutions between the highest polyphosphide and phosphorus [ru

  2. Simulations of phase transitions in ionic systems

    International Nuclear Information System (INIS)

    Panagiotopoulos, A Z

    2005-01-01

    A review of recent simulation work in the area of phase transitions in ionic systems is presented. The vapour-liquid transition for the restricted primitive model has been studied extensively in the past decade. The critical temperature is now known to excellent accuracy and the critical density to moderate accuracy. There is also strong simulation-based evidence that the model is in the Ising universality class. Discretized lattice versions of the model are reviewed. Other systems covered are size- and charge-asymmetric electrolytes, colloid-salt mixtures, realistic salt models and charged chains. Areas of future research needs are briefly discussed

  3. An expert system based software sizing tool, phase 2

    Science.gov (United States)

    Friedlander, David

    1990-01-01

    A software tool was developed for predicting the size of a future computer program at an early stage in its development. The system is intended to enable a user who is not expert in Software Engineering to estimate software size in lines of source code with an accuracy similar to that of an expert, based on the program's functional specifications. The project was planned as a knowledge based system with a field prototype as the goal of Phase 2 and a commercial system planned for Phase 3. The researchers used techniques from Artificial Intelligence and knowledge from human experts and existing software from NASA's COSMIC database. They devised a classification scheme for the software specifications, and a small set of generic software components that represent complexity and apply to large classes of programs. The specifications are converted to generic components by a set of rules and the generic components are input to a nonlinear sizing function which makes the final prediction. The system developed for this project predicted code sizes from the database with a bias factor of 1.06 and a fluctuation factor of 1.77, an accuracy similar to that of human experts but without their significant optimistic bias.

  4. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  5. Calibration of an arbitrarily arranged projection moiré system for 3D shape measurement

    Science.gov (United States)

    Tang, Ying; Yao, Jun; Zhou, Yihao; Sun, Chen; Yang, Peng; Miao, Hong; Chen, Jubing

    2018-05-01

    An arbitrarily arranged projection moiré system is presented for three-dimensional shape measurement. We develop a model for projection moiré system and derive a universal formula expressing the relation between height and phase variation before and after we put the object on the reference plane. With so many system parameters involved, a system calibration technique is needed. In this work, we provide a robust and accurate calibration method for an arbitrarily arranged projection moiré system. The system no longer puts restrictions on the configuration of the optical setup. Real experiments have been conducted to verify the validity of this method.

  6. Low Energy Nuclear Reaction Aircraft- 2013 ARMD Seedling Fund Phase I Project

    Science.gov (United States)

    Wells, Douglas P.; McDonald, Robert; Campbell, Robbie; Chase, Adam; Daniel, Jason; Darling, Michael; Green, Clayton; MacGregor, Collin; Sudak, Peter; Sykes, Harrison; hide

    2014-01-01

    This report serves as the final written documentation for the Aeronautic Research Mission Directorate (ARMD) Seedling Fund's Low Energy Nuclear Reaction (LENR) Aircraft Phase I project. The findings presented include propulsion system concepts, synergistic missions, and aircraft concepts. LENR is a form of nuclear energy that potentially has over 4,000 times the energy density of chemical energy sources. It is not expected to have any harmful emissions or radiation which makes it extremely appealing. There is a lot of interest in LENR, but there are no proven theories. This report does not explore the feasibility of LENR. Instead, it assumes that a working system is available. A design space exploration shows that LENR can enable long range and high speed missions. Six propulsion concepts, six missions, and four aircraft concepts are presented. This report also includes discussion of several issues and concerns that were uncovered during the study and potential research areas to infuse LENR aircraft into NASA's aeronautics research.

  7. Estuary 2100 Project, Phase 1: Resilient Watersheds for a Changing Climate

    Science.gov (United States)

    Information about the SFBWQP Estuary 2100 Project, Phase 1: Resilient Watersheds for a Changing Climate , part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  8. Program for the Stripa project phase 3, 1986-1991

    International Nuclear Information System (INIS)

    1987-05-01

    In June 1985, the Joint Technical Committee agreed to proceed with the planning required for the initiation of a Phase 3. The following general objectives of a third phase were agreed upon: To integrate various site characterization techniques and methods of analysis for the prediction and validation of ground-water flow and nuclide transport in an unexplored volume of Stripa granite and to demonstrate and verify the use of different materials and techniques for sealing ground-water flow paths in the Stripa granite. A schedule for the solicitation review of proposals was established. The general areas of investigations were defined as: Site characterization and validation; improvement of site assessment methods and concepts; sealing of fractured rock. (orig./HP)

  9. Recovery Efficiency Test Project: Phase 1, Activity report

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Wilkins, D.W.; Keltch, B.; Saradji, B.; Salamy, S.P.

    1988-04-01

    This report is the second volume of the Recovery Efficiency Test Phase I Report of Activities. Volume 1 covered selection, well planning, drilling, coring, logging and completion operations. This volume reports on well testing activities, reclamation activities on the drilling site and access roads, and the results of physical and mechanical properties tests on the oriented core material obtained from a horizontal section of the well. 3 refs., 21 figs., 10 tabs.

  10. The FAZIA project in Europe: R and D phase

    Energy Technology Data Exchange (ETDEWEB)

    Bougault, R.; Le Neindre, N.; Bougard, B.; Desrues, P.; Legouee, E.; Lopez, O.; Merrer, Y.; Pain, C.; Vient, E. [Universite de Caen, CNRS-IN2P3, LPC Caen, ENSICAEN, Caen cedex (France); Poggi, G.; Barlini, S.; Pasquali, G.; Bardelli, L.; Bini, M.; Carboni, S.; Pastore, G.; Stefanini, A.A.; Valdre, S. [Universita di Firenze, Dipartimento di Fisica, Sesto Fiorentino (Italy); Sezione di Firenze, INFN, Sesto Fiorentino (Italy); Borderie, B.; Ademard, G.; Barbey, S.; Brulin, G.; Edelbruck, P.; Hamrita, H.; Huss, C.; Lavergne, L.; Rauly, E.; Rivet, M.F.; Salomon, F.; Seredov, V.; Wanlin, E. [Universite Paris-Sud 11, Institut de Physique Nucleaire, CNRS/IN2P3, Orsay cedex (France); Casini, G.; Piantelli, S.; Olmi, A.; Tobia, G. [Sezione di Firenze, INFN, Sesto Fiorentino (Italy); Chbihi, A.; Boisjoli, M.; Bonnet, E.; Frankland, J.D.; Gruyer, D.; Marini, P.; Spitaels, C. [CEA/DSM-CNRS/IN2P3, GANIL, Caen cedex (France); Parlog, M. [Universite de Caen, CNRS-IN2P3, LPC Caen, ENSICAEN, Caen cedex (France); Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH), Bucharest Magurele (Romania); Sosin, Z.; Kajetanowicz, M.; Kozik, T.; Kulig, P.; Palka, M.; Sierpowski, D.; Twarog, T.; Wieloch, A. [Institute of Physics, Jagiellonian University, Krakow (Poland); Alba, R.; Maiolino, C.; Santonocito, D. [Laboratori Nazionali del Sud, INFN, Catania (Italy); Anastasio, A.; Boiano, A.; Cassese, C.; Cassese, F.; D' Aquino, B.; Di Meo, P.; Masone, V.; Meoli, A.; Ordine, A.; Paduano, G.; Passeggio, G.; Pontoriere, G.; Rocco, R.; Roscilli, L.; Tortone, G.; Vanzanella, A.; Vanzanella, E.; Vitiello, G. [Complesso Universitario di Monte S. Angelo, Napoli (Italy); INFN - Sezione di Napoli, Napoli (Italy); Borcea, R.; Ciolacu, L.; Cruceru, I.; Cruceru, M.; Negoita, F.; Petcu, M.; Petrascu, H. [Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH), Bucharest Magurele (Romania); Bruno, M.; Morelli, L. [INFN, Sezione di Bologna (Italy); Dipartimento di Fisica ed Astronomia, Universita di Bologna, Bologna (Italy); Cinausero, M.; Gramegna, F.; Marchi, T. [LNL Legnaro, INFN, Legnaro (Italy); De Fazio, B. [Complesso Universitario di Monte S. Angelo, Dipartimento di Fisica, Universita di Napoli ' ' Federico II' ' , Napoli (Italy); Degerlier, M. [Nevsehir Haci Bektas University, Science and Art Faculty, Physics Department, Nevsehir (Turkey); Duenas, J.A.; Martel, I. [FCCEE Universidad de Huelva, Departamento de Fisica Aplicada, Huelva (Spain); Energico, S. [Complesso Universitario di Monte S. Angelo, Istituto SPIN - CNR, Napoli (Italy); Falorsi, M.; Scarlini, E. [Universita di Firenze, Dipartimento di Fisica, Sesto Fiorentino (Italy); Galichet, E. [Universite Paris-Sud 11, Institut de Physique Nucleaire, CNRS/IN2P3, Orsay cedex (France); Conservatoire National des Arts et Metiers, Paris (France); Gasior, K.; Grzeszczuk, A.; Zipper, W. [University of Silesia, August Chellkowski Institute of Physics, Katowice (Poland); Giordano, R. [Complesso Universitario di Monte S. Angelo, Napoli (Italy); INFN - Sezione di Napoli, Napoli (Italy); Universita di Napoli ' ' Federico II' ' , Dipartimento di Informatica e Sistemistica, Napoli (Italy); Guerzoni, M.; Serra, S. [Sezione di Bologna, INFN, Bologna (Italy); Korcyl, K.; Lukasik, J.; Pawlowski, P. [Institute of Nuclear Physics PAN, Krakow (Poland); Kordyasz, A.; Piasecki, E. [University of Warsaw, Heavy Ion Laboratory, Warsaw (Poland); Rosato, E.; Spadaccini, G.; Vigilante, M. [Complesso Universitario di Monte S. Angelo, Napoli (Italy); INFN - Sezione di Napoli, Napoli (Italy); Complesso Universitario di Monte S. Angelo, Dipartimento di Fisica, Universita di Napoli ' ' Federico II' ' , Napoli (Italy); Collaboration: The FAZIA Collaboration

    2014-02-15

    The goal of the FAZIA Collaboration is the design of a new-generation 4π detector array for heavy-ion collisions with radioactive beams. This article summarizes the main results of the R and D phase, devoted to the search for significant improvements of the techniques for charge and mass identification of reaction products. This was obtained by means of a systematic study of the basic detection module, consisting of two transmission-mounted silicon detectors followed by a CsI(Tl) scintillator. Significant improvements in ΔE-E and pulse-shape techniques were obtained by controlling the doping homogeneity and the cutting angles of silicon and by putting severe constraints on thickness uniformity. Purposely designed digital electronics contributed to identification quality. The issue of possible degradation related to radiation damage of silicon was also addressed. The experimental activity was accompanied by studies on the physics governing signal evolution in silicon. The good identification quality obtained with the prototypes during the R and D phase, allowed us to investigate also some aspects of isospin physics, namely isospin transport and odd-even staggering. Now, after the conclusion of the R and D period, the FAZIA Collaboration has entered the demonstrator phase, with the aim of verifying the applicability of the devised solutions for the realization of a larger-scale experimental set-up. (orig.)

  11. The FAZIA project in Europe: R and D phase

    International Nuclear Information System (INIS)

    Bougault, R.; Le Neindre, N.; Bougard, B.; Desrues, P.; Legouee, E.; Lopez, O.; Merrer, Y.; Pain, C.; Vient, E.; Poggi, G.; Barlini, S.; Pasquali, G.; Bardelli, L.; Bini, M.; Carboni, S.; Pastore, G.; Stefanini, A.A.; Valdre, S.; Borderie, B.; Ademard, G.; Barbey, S.; Brulin, G.; Edelbruck, P.; Hamrita, H.; Huss, C.; Lavergne, L.; Rauly, E.; Rivet, M.F.; Salomon, F.; Seredov, V.; Wanlin, E.; Casini, G.; Piantelli, S.; Olmi, A.; Tobia, G.; Chbihi, A.; Boisjoli, M.; Bonnet, E.; Frankland, J.D.; Gruyer, D.; Marini, P.; Spitaels, C.; Parlog, M.; Sosin, Z.; Kajetanowicz, M.; Kozik, T.; Kulig, P.; Palka, M.; Sierpowski, D.; Twarog, T.; Wieloch, A.; Alba, R.; Maiolino, C.; Santonocito, D.; Anastasio, A.; Boiano, A.; Cassese, C.; Cassese, F.; D'Aquino, B.; Di Meo, P.; Masone, V.; Meoli, A.; Ordine, A.; Paduano, G.; Passeggio, G.; Pontoriere, G.; Rocco, R.; Roscilli, L.; Tortone, G.; Vanzanella, A.; Vanzanella, E.; Vitiello, G.; Borcea, R.; Ciolacu, L.; Cruceru, I.; Cruceru, M.; Negoita, F.; Petcu, M.; Petrascu, H.; Bruno, M.; Morelli, L.; Cinausero, M.; Gramegna, F.; Marchi, T.; De Fazio, B.; Degerlier, M.; Duenas, J.A.; Martel, I.; Energico, S.; Falorsi, M.; Scarlini, E.; Galichet, E.; Gasior, K.; Grzeszczuk, A.; Zipper, W.; Giordano, R.; Guerzoni, M.; Serra, S.; Korcyl, K.; Lukasik, J.; Pawlowski, P.; Kordyasz, A.; Piasecki, E.; Rosato, E.; Spadaccini, G.; Vigilante, M.

    2014-01-01

    The goal of the FAZIA Collaboration is the design of a new-generation 4π detector array for heavy-ion collisions with radioactive beams. This article summarizes the main results of the R and D phase, devoted to the search for significant improvements of the techniques for charge and mass identification of reaction products. This was obtained by means of a systematic study of the basic detection module, consisting of two transmission-mounted silicon detectors followed by a CsI(Tl) scintillator. Significant improvements in ΔE-E and pulse-shape techniques were obtained by controlling the doping homogeneity and the cutting angles of silicon and by putting severe constraints on thickness uniformity. Purposely designed digital electronics contributed to identification quality. The issue of possible degradation related to radiation damage of silicon was also addressed. The experimental activity was accompanied by studies on the physics governing signal evolution in silicon. The good identification quality obtained with the prototypes during the R and D phase, allowed us to investigate also some aspects of isospin physics, namely isospin transport and odd-even staggering. Now, after the conclusion of the R and D period, the FAZIA Collaboration has entered the demonstrator phase, with the aim of verifying the applicability of the devised solutions for the realization of a larger-scale experimental set-up. (orig.)

  12. Dynamic Isotope Power System: technology verification phase, program plan, 1 October 1978

    International Nuclear Information System (INIS)

    1979-01-01

    The technology verification phase program plan of the Dynamic Isotope Power System (DIPS) project is presented. DIPS is a project to develop a 0.5 to 2.0 kW power system for spacecraft using an isotope heat source and a closed-cycle Rankine power-system with an organic working fluid. The technology verification phase's purposes are to increase the system efficiency to over 18%, to demonstrate system reliability, and to provide an estimate for flight test scheduling. Progress toward these goals is reported

  13. Phase 2 of the Nea TDB project and some lessons learned from the use of phase 1 data

    International Nuclear Information System (INIS)

    Spahiu, K.

    2002-01-01

    As the five initial reviews of the TDB Project come to their conclusion, the negotiations for an independently funded continuation of the TDB Project through two meetings of an ad hoc group were completed in late 1997. The participating organisations are ANSTO (Australia), NIRAS/ONDRAF (Belgium), RAWRA (Czech Republic), POSIVA (Finland), ANDRA and IPSN (France), FZK (Germany), JNC/PNC (Japan), ENRESA (Spain), SKB and SKI (Sweden), HSK, NAGRA and PSI (Switzerland), BNFL and NIREX (UK) and the DOE (USA). This project is referred to as the TDB Phase II Project, or simply TDB II. The following new reviews will be performed within this project: - an update of the existing U/Am/Tc/Np/Pu reviews (one review team for all elements); - the inorganic chemistry of Ni; - the inorganic chemistry of Se; - the complexation of selected simple organic ligands (ISA, EDTA, citrate and oxalate) with U, Am, Tc, Np, Pu, Ni, Se, Zr and some selected competing cations; the inorganic chemistry of Zr. These review areas have been decided on taking into account the toxicity, mobility, radioactivity and half-lives of the commonly occurring nuclides in radioactive waste, as well as the particular areas of interest of the funding organisations. To avoid the delays that have plagued Phase I, the organisation of the TDB Project has been restructured, and the funding provided has been calculated to cover all necessary expenses for the project. (author)

  14. CEC project Mirage - Second phase on migration of radionuclides in the geosphere

    International Nuclear Information System (INIS)

    Come, B.

    1989-01-01

    A second phase of the Community coordinated project Mirage (migration of radionuclides in the geosphere) was launched in 1986. The present report brings together reviews of work done in the four research areas of this phase for 1988, and therefore constitues an update of the previous report, ref. EUR 11589. This project is part of the CEC R and D programme on radioactive waste management (1985-89)

  15. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  16. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  17. Novel image reconstruction algorithm for multi-phase flow tomography system using γ ray method

    International Nuclear Information System (INIS)

    Hao Kuihong; Wang Huaxiang; Gao Mei

    2007-01-01

    After analyzing the reason of image reconstructed algorithm by using the conventional back projection (IBP) is prone to produce spurious line, and considering the characteristic of multi-phase flow tomography, a novel image reconstruction algorithm is proposed, which carries out the intersection calculation using back projection data. This algorithm can obtain a perfect system point spread function, and can eliminate spurious line better. Simulating results show that the algorithm is effective for identifying multi-phase flow pattern. (authors)

  18. Risk level project. Summary report, Norwegian Shelf, Phase 7; Risikonivaaprosjektet. Sammendragsrapport Norsk Sokkel, fase 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    The project 'developments in risk level - Norwegian shelf', also known as the risk level project, was initiated by the Norwegian Petroleum Directorate in 2000. From 2004 the project has been continued by Petroleum Safety Authority Norway. The project's main objectives are to measure the effect of the health, security and environment (HSE) work in the industry, and contribute to identify the areas critical to HSE, where efforts must be made to prevent unwanted events or accidents. A summary report with results from phase 7 in the project (ml)

  19. Supporting innovation. International Project on Innovative Nuclear Reactors and Fuel Cycles moves into first phase

    International Nuclear Information System (INIS)

    Gowin, Peter J.; Kupitz, Juergen

    2001-01-01

    energy needs and environmental impact. In order for nuclear energy to play a meaningful role in the global energy supply in the foreseeable future, innovative approaches will be required to address concerns about economic competitiveness, safety, waste and potential proliferation risks.' INPRO's objectives, as defined in the Terms of Reference, are: to help to ensure that nuclear energy is available to contribute in fulfilling, in a sustainable manner, energy needs in the 21st century; to bring together all interested Member States, both technology holders and technology users, to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles that use sound and economically competitive technology, are based - to the extent possible - on systems with inherent safety features and minimise the risk of proliferation and the impact on the environment; to create a process that involves all relevant stake holders that will have an impact on, draw from, and complement the activities of existing institutions, as well as ongoing initiatives at the national and international level. INPRO is an Agencywide project, with contributions from all relevant IAEA Departments within available resources. The Project will be implemented in two phases. Phase I was initiated in early 2001 and is planned to run to 2003. In the first phase, work will proceed in five subject areas recognized as important for the future development of nuclear energy technology, and on two parallel tracks. Upon successful completion of INPRO's first phase, taking into account advice from the Steering Committee, and with the approval of participating Member States, a second phase of INPRO may be initiated. Drawing on the results from the first phase, it would be directed at: examining in the context of available technologies the feasibility of commencing an international project; and identifying technologies which might be appropriate for

  20. Results of single borehole hydraulic testing in the Mizunami Underground Research Laboratory project. Phase 2

    International Nuclear Information System (INIS)

    Daimaru, Shuji; Takeuchi, Ryuji; Onoe, Hironori; Saegusa, Hiromitsu

    2012-09-01

    This report summarize the results of the single borehole hydraulic tests of 79 sections conducted as part of the Construction phase (Phase 2) in the Mizunami Underground Research Laboratory (MIU) Project. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical method used are presented in this report. (author)

  1. Service water system aging assessment - Phase I

    International Nuclear Information System (INIS)

    Jarrell, D.B.; Zimmerman, P.W.; Gore, M.L.

    1988-01-01

    The Service Water System (SWS) represents the final heat transfer loop between decay heat generated in the nuclear core and the safe dispersal of that heat energy in the environment. It is the objective of this investigation to demonstrate that aging phenomena can be identified and quantified such that aging degradation of system components can be detected and mitigated prior to the reduction of system availability to below an acceptable threshold. The approach used during the Phase I task was to (1) perform a literature search of government and private sector reports which relate to service water, aging related degradation, and potential methodologies for analysis; (2) assemble a data base which contains all the commercial power plants in the US, their Service Water System configuration, characteristics, and water source; (3) obtain and examine the available service water data from large generic data bases, i.e. NPRDS, LER, NPE, inspection reports, and other relevant plant reference data; (4) perform a fault tree analysis of a typical plant service water systems to examine failure propagation and understand specific input requirements of probabilistic risk analyses; (5) develop an in-depth questionnaire protocol for examining the information resource at a power plant which is not available through data base query and visit a central station power plant and solicit the required information; (6) analyze the information obtained from the in-depth plant interrogation and draw contrasts and conclusions with the data base information; (7) utilize the plant information to perform an interim assessment of service water system degradation mechanisms and focus future investigations. This paper addresses the elements of this task plan numbered 1, 3, 6, and 7. The remaining items are detailed in the phase-I report

  2. Phasing of Debuncher Stochastic Cooling Transverse Systems

    International Nuclear Information System (INIS)

    Pasquinelli, Ralph

    2000-01-01

    With the higher frequency of the cooling systems in the Debuncher, a modified method of making transfer functions has been developed for transverse systems. (Measuring of the momentum systems is unchanged.) Speed in making the measurements is critical, as the beam tends to decelerate due to vacuum lifetime. In the 4-8 GHz band, the harmonics in the Debuncher are 6,700 to 13,400 times the revolution frequency. Every Hertz change in revolution frequency is multiplied by this harmonic number and becomes a frequency measurement error, which is an appreciable percent of the momentum width of the beam. It was originally thought that a momentum cooling system would be phased first so that the beam could be kept from drifting in revolution frequency. As it turned out, the momentum cooling was so effective (even with the gain turned down) that the momentum width normalized to fo became less than one Hertz on the Schottky pickup. A beam this narrow requires very precise measurement of tune and revolution frequency. It was difficult to get repeatable results. For initial measuring of the transverse arrays, relative phase and delay is all that is required, so the measurement settings outlined below will suffice. Once all input and output arrays are phased, a more precise measurement of all pickups to all kickers can be done with more points and both upper and lower side bands, as in figure 1. Settings on the network analyzer were adjusted for maximum measurement speed. Data is not analyzed until a complete set of measurements is taken. Start and stop frequencies should be chosen to be just slightly wider than the band being measured. For transverse systems, select betatron USB for the measurement type. This will make the measurement two times faster. Select 101 for the number of points, sweep time of 5 seconds, IF bandwidth 30 Hz, averages = 1. It is important during the phasing to continually measure the revolution frequency and beam width of the beam for transverse systems

  3. Individualized Inservice Teacher Education (Project In-Step). Evaluation Report. Phase III.

    Science.gov (United States)

    Thurber, John C.

    This is a report on the third phase of Project IN-STEP, which was intended to develop a viable model for individualized, multi-media in-service teacher education programs. (Phase I and II are reported in ED 033 905, and ED 042 709). The rationale for Phase III was to see if the model could be successfully transferred to an area other than teaching…

  4. New photosensitive systems for volume phase holography

    Science.gov (United States)

    Bianco, Andrea; Colella, Letizia; Galli, Paola; Zanutta, Alessio; Bertarelli, Chiara

    2017-05-01

    Volume phase holographic elements are becoming attractive thanks to the large efficiency and good optical quality. They are based on photosensitive materials where a modulation of the refractive index is induced. In this paper, we highlight the strategies to obtain a change in the refractive index in a dielectric material, namely a change in the material density and/or in the molecular polarizability. Moreover, we show the results achieved for materials that undergo the photo-Fries reaction as function of the molecular structure and the illumination conditions. We also report the results on a system based on the diazo Meldrum's acid where volatile molecules are produced upon light exposure.

  5. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  6. The Geometric Phase in Quantum Systems

    International Nuclear Information System (INIS)

    Pascazio, S

    2003-01-01

    The discovery of the geometric phase is one of the most interesting and intriguing findings of the last few decades. It led to a deeper understanding of the concept of phase in quantum mechanics and motivated a surge of interest in fundamental quantum mechanical issues, disclosing unexpected applications in very diverse fields of physics. Although the key ideas underlying the existence of a purely geometrical phase had already been proposed in 1956 by Pancharatnam, it was Michael Berry who revived this issue 30 years later. The clarity of Berry's seminal paper, in 1984, was extraordinary. Research on the topic flourished at such a pace that it became difficult for non-experts to follow the many different theoretical ideas and experimental proposals which ensued. Diverse concepts in independent areas of mathematics, physics and chemistry were being applied, for what was (and can still be considered) a nascent arena for theory, experiments and technology. Although collections of papers by different authors appeared in the literature, sometimes with ample introductions, surprisingly, to the best of my knowledge, no specific and exhaustive book has ever been written on this subject. The Geometric Phase in Quantum Systems is the first thorough book on geometric phases and fills an important gap in the physical literature. Other books on the subject will undoubtedly follow. But it will take a fairly long time before other authors can cover that same variety of concepts in such a comprehensive manner. The book is enjoyable. The choice of topics presented is well balanced and appropriate. The appendices are well written, understandable and exhaustive - three rare qualities. I also find it praiseworthy that the authors decided to explicitly carry out most of the calculations, avoiding, as much as possible, the use of the joke 'after a straightforward calculation, one finds...' This was one of the sentences I used to dislike most during my undergraduate studies. A student is

  7. Nonlinear observer based phase synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Meng Juan; Wang Xingyuan

    2007-01-01

    This Letter analyzes the phase synchronization problem of autonomous chaotic systems. Based on the nonlinear state observer algorithm and the pole placement technique, a phase synchronization scheme is designed. The phase synchronization of a new chaotic system is achieved by using this observer controller. Numerical simulations further demonstrate the effectiveness of the proposed phase synchronization scheme

  8. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  9. New bern biomass to energy project Phase I: Feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Parson, F.; Bain, R.

    1995-10-01

    Weyerhaeuser, together with Amoco and Carolina Power & Light, performed a detailed evaluation of biomass gasification and enzymatic processing of biomass to ethanol. This evaluation assesses the potential of these technologies for commercial application to determine which technology offers the best opportunity at this time to increase economic productivity of forest resources in an environmentally sustainable manner. The work performed included preparation of site-specific plant designs that integrate with the Weyerhaeuser New Bern, North Carolina pulp mill to meet overall plant energy requirements, cost estimates, resource and product market assessments, and technology evaluations. The Weyerhaeuser team was assisted by Stone & Webster Engineering Corporation and technology vendors in developing the necessary data, designs, and cost information used in this comparative study. Based on the information developed in this study and parallel evaluations performed by Weyerhaeuser and others, biomass gasification for use in power production appears to be technically and economically viable. Options exist at the New Bern mill which would allow commercial scale demonstration of the technology in a manner that would serve the practical energy requirements of the mill. A staged project development plan has been prepared for review. The plan would provide for a low-risk and cost demonstration of a biomass gasifier as an element of a boiler modification program and then allow for timely expansion of power production by the addition of a combined cycle cogeneration plant. Although ethanol technology is at an earlier stage of development, there appears to be a set of realizable site and market conditions which could provide for an economically attractive woody-biomass-based ethanol facility. The market price of ethanol and the cost of both feedstock and enzyme have a dramatic impact on the projected profitability of such a plant.

  10. Final Report for the ADMX Phase 2a Project at the University of Washington

    International Nuclear Information System (INIS)

    Rosenberg, Leslie J.

    2015-01-01

    This is a final report of the ADMX (Axion Dark Matter eXperiment) Phase 2a program. This program is a project allowing for a sensitive axion dark-matter search at higher axion masses. The Phase 2a program also prepares the project for lower temperature anticipated in later operations. The Phase 2a program includes sensitive data-taking operations at two cavity modes, TM010 and TM020, allowing for faster data-taking operations and extending the search to higher and plausible dark-matter axion masses.

  11. Final report on the surface-based investigation (phase 1) at the Mizunami Underground Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Seno, Yasuhiro; Nakama, Shigeo; Tsuruta, Tadahiko; Amano, Kenji; Takeuchi, Ryuji; Matsuoka, Toshiyuki; Onoe, Hironori; Mizuno, Takashi; Ohyama, Takuya; Hama, Katsuhiro; Sato, Toshinori; Kuji, Masayoshi; Kuroda, Hidetaka; Semba, Takeshi; Uchida, Masahiro; Sugihara, Kozo; Sakamaki, Masanori; Iwatsuki, Teruki

    2007-03-01

    The Mizunami Underground Laboratory (MIU) Project is a comprehensive research project investigating the deep underground environment within crystalline rock being conducted by Japan Atomic Energy Agency at Mizunami City in Gifu Prefecture, central Japan and its role is defined in 'Framework for Nuclear Energy Policy' by Japan Atomic Energy Commission. The MIU Project has three overlapping phases: Surface-based Investigation phase (Phase I), Construction phase (Phase II), and Operation phase (Phase III), with a total duration of 20 years. The overall project goals of the MIU Project from Phase I through to Phase III are: 1) to establish techniques for investigation, analysis and assessment of the deep geological environment, and 2) to develop a range of engineering for deep underground application. During Phase I, the overall project goals were supported by Phase I goals. For the overall project goals 1), the Phase I goals were set to construct models of the geological environment from all surface-based investigation results that describe the geological environment prior to excavation and predict excavation response. For the overall project goals 2), the Phase I goals were set to formulate detailed design concepts and a construction plan for the underground facilities. This report summarizes the Phase I investigation which was completed in March 2005. The authors believe this report will make an important milestone, since this report clarifies how the Phase I goals are achieved and evaluate the future issues thereby direct the research which will be conducted during Phase II. With regard to the overall project goals 1), 'To establish techniques for investigation, analysis and assessment of the deep geological environment,' a step-wise investigation was conducted by iterating investigation, interpretation, and assessment, thereby understanding of geologic environment was progressively and effectively improved with progress of investigation. An optimal procedure from

  12. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  13. The Expert Project Management System (EPMS)

    Science.gov (United States)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  14. Phase and amplitude detection system for the Stanford Linear Accelerator

    International Nuclear Information System (INIS)

    Fox, J.D.; Schwarz, H.D.

    1983-01-01

    A computer controlled phase and amplitude detection system to measure and stabilize the rf power sources in the Stanford Linear Accelerator is described. This system measures the instantaneous phase and amplitude of a 1 microsecond 2856 MHz rf pulse and will be used for phase feedback control and for amplitude and phase jitter detection. This paper discusses the measurement system performance requirements for the operation of the Stanford Linear Collider, and the design and implementation of the phase and amplitude detection system. The fundamental software algorithms used in the measurement are described, as is the performance of the prototype phase and amplitude detector system

  15. Phase diagrams of Pr-C system

    International Nuclear Information System (INIS)

    Eremenko, V.N.; Velikanova, T.Ya.; Gordijchuk, O.V.

    1988-01-01

    Results of the X-ray phase, metallographic and high-temperature differential thermal analysis are used for the first time to plot a diagram of the Pr-C system state. Carbides are formed in the system: Pr 2 C 3 with the bcc-structure of the Pu 2 C 3 type and with the period a 0 = 0.85722+-0.00026 within the phase region + 2 C 3 >, a 0 0.86078+-0.00016 nm - within the region 2 C 3 >+α-PrC 2 ; dimorphous PrC 2 : α-PrC 2 with the bct-structure of the CaC 2 type and periods a 0.38517+-0.00011, c 0 = 0.64337+-0.00019 nm; β-PrC 2 with the fcc-structure, probably, of KCN type. Dicarbide melts congruently at 2320 grad. C, forming eutectics with graphite at 2254+-6 grad. C and composition of 71.5% (at.)C. It is polymorphously transformed in the phase region 2 C 3 > + 2 > at 1145+-4 grad. C, and in the region 2 >+C at 1134+-4 grad. C. Sesquicarbide melts incongruently at 1545+-4 grad. C. The eutectic reaction L ↔ + 2 C 3 > occurs at 800+-4 grad. C, the eutectic composition ∼ 15% (at.)C. The temperature of the eutectoid reaction ↔ + 2 C 3 > is 675+-6 grad C. The limiting carbon solubility in β-Pr is about 8 and in α-Pr it is about 5% (at.)

  16. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  17. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  18. Cyprus natural analogue project (CNAP). Phase II Final Report

    International Nuclear Information System (INIS)

    Alexander, W.R.; Milodowski, A.E.

    2011-02-01

    Due to the extremely slow kinetics of bentonite reaction in low alkali cement leachates, natural analogues would appear to be the only viable method of studying bentonite reaction. As a result of a review of the available literature, several sites in Cyprus were selected as particularly promising for this purpose. This report presents the results of two short field campaigns in Cyprus in November/December, 2008 and February, 2009. The main aim of these campaigns was to establish if appropriate sites existed for a natural analogue study of bentonite-low alkali cement leachate reaction. Focus is on mineralogical changes and not changes in physical properties (such as porosity and permeability) of bentonite as the industrially-processed bentonite used in a repository will be completely different in terms of its engineering and hydrogeological properties to the unprocessed natural bentonite or analogue smectite-rich materials. The first campaign was in the form of a reconnaissance study to identify sites of likely interest and the second, follow-up, campaign focussed on obtaining preliminary groundwater and solid phase (bentonites/clay-rich sediments/altered igneous rocks/soils) samples which would allow a more detailed assessment of several of the potential sites. A large amount of information was collected during these short field campaigns and subsequent laboratory analysis of the collected samples so, to keep the main report down to a digestible size, much of the supporting information has been collated in seven appendices. These include full details of all 30 sites visited during both campaigns along with sample details, information on the analytical techniques, the analytical raw data and numerous photographs of the sites. The intention is that this report will provide full supporting information for a potential Phase III and a detailed database for our colleagues at the Geological Survey Department (GSD) in Cyprus. Consequently, all the information acquired

  19. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  20. A Survey of Phase Change Memory Systems

    Institute of Scientific and Technical Information of China (English)

    夏飞; 蒋德钧; 熊劲; 孙凝晖

    2015-01-01

    As the scaling of applications increases, the demand of main memory capacity increases in order to serve large working set. It is difficult for DRAM (dynamic random access memory) based memory system to satisfy the memory capacity requirement due to its limited scalability and high energy consumption. Compared to DRAM, PCM (phase change memory) has better scalability, lower energy leakage, and non-volatility. PCM memory systems have become a hot topic of academic and industrial research. However, PCM technology has the following three drawbacks: long write latency, limited write endurance, and high write energy, which raises challenges to its adoption in practice. This paper surveys architectural research work to optimize PCM memory systems. First, this paper introduces the background of PCM. Then, it surveys research efforts on PCM memory systems in performance optimization, lifetime improving, and energy saving in detail, respectively. This paper also compares and summarizes these techniques from multiple dimensions. Finally, it concludes these optimization techniques and discusses possible research directions of PCM memory systems in future.

  1. Fuel Rod Consolidation Project: Phase 2, Final report: Volume 1

    International Nuclear Information System (INIS)

    1987-01-01

    This design report describes the NUS final design of the Prototype Spent Nuclear Fuel Rod Consolidation System. This summary presents the approach and the subsequent sections describe, in detail, the final design. Detailed data, drawings, and the design Basis Accident Report are provided in Volumes II thru V. The design as presented, represents one cell of a multicell facility for the dry consolidation of any type of PWR and BWR fuel used in the United States LWR industry that will exceed 1% of the fuel inventory at the year 2000. The system contains the automatically-controlled equipment required to consolidate 750MT (heavy metal)/year, at 75% availability. The equipment is designed as replaceable components using state-of-the-art tchnology. The control system utilizes the most advanced commercially available equipment on the market today. Two state-of-the-art advanced servo manipulators are provided for system maintenance. In general the equipment is designed utilizing fabricated and commercial components. For example, the main drive systems use commercially available roller screws. These rollers screws have 60,000 hours of operation in nuclear power plants and have been used extensively in other applications. The motors selected represent the most advanced designed servo motors on the market today for the precision control of machinery. In areas where precise positioning was not required, less expensive TRW Globe motors were selected. These are small compact motors with a long history of operations in radiation environments. The Robotic Bridge Transporters are modified versions of existing bridge cranes for remote automatic operations. Other equipment such as the welder for fuel canister closure operations is a commercially available product with an operating history applicable to this process. In general, this approach was followed throughout the design of all the equipment and will enable the system to be developed without costly development programs

  2. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    Energy Technology Data Exchange (ETDEWEB)

    Bonnal, P. [CERN; Féral, B. [CERN; Kershaw, K. [CERN; Nicquevert, B. [CERN; Baudin, M. [Ecole Normale Superieure; Lari, L. [ESS, Lund; Le Cardinal, J. [Chatenay-Malabry, Ecole Centrale

    2016-07-15

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies and development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.

  3. Road Transportable Analytical Laboratory system. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Finger, S.M.; Keith, V.F.; Spertzel, R.O.; De Avila, J.C.; O`Donnell, M.; Vann, R.L.

    1993-09-01

    This developmental effort clearly shows that a Road Transportable Analytical Laboratory System is a worthwhile and achievable goal. The RTAL is designed to fully analyze (radioanalytes, and organic and inorganic chemical analytes) 20 samples per day at the highest levels of quality assurance and quality control. It dramatically reduces the turnaround time for environmental sample analysis from 45 days (at a central commercial laboratory) to 1 day. At the same time each RTAL system will save the DOE over $12 million per year in sample analysis costs compared to the costs at a central commercial laboratory. If RTAL systems were used at the eight largest DOE facilities (at Hanford, Savannah River, Fernald, Oak Ridge, Idaho, Rocky Flats, Los Alamos, and the Nevada Test Site), the annual savings would be $96,589,000. The DOE`s internal study of sample analysis needs projects 130,000 environmental samples requiring analysis in FY 1994, clearly supporting the need for the RTAL system. The cost and time savings achievable with the RTAL system will accelerate and improve the efficiency of cleanup and remediation operations throughout the DOE complex.

  4. Small and medium power reactors: project initiation study, Phase 1

    International Nuclear Information System (INIS)

    1985-07-01

    In conformity with the Agency's promotional role in the peaceful uses of nuclear energy, IAEA has provided, over the past 20 years, assistance to Member States, particularly developing countries, in planning for the introduction of nuclear power plants in the Small and Medium range (SMPR). However these efforts did not produce any significant results in the market introduction of these reactors, due to various factors. In 1983 the Agency launched a new SMPR Project Initiation Study with the objective of surveying the available designs, examining the major factors influencing the decision-making processes in Developing Countries and thereby arriving at an estimate of the potential market. Two questionnaires were used to obtain information from possible suppliers and prospective buyers. The Nuclear Energy Agency of OECD assisted in making a study of the potential market in industrialized countries. The information gained during the study and discussed during a Technical Committee Meeting on SMPRs held in Vienna in March 1985, along with the contribution by OECD-NEA is embodied in the present report

  5. Recovery efficiency test project, Phase 2 activity report

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Salamy, S.P.; Locke, C.D.

    1989-02-01

    The Recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency of gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. This volume contains appendices for: (1) supporting material and procedures for data frac'' stimulation of zone 6 using nitrogen and nitrogen foam; (2) supporting material and procedures for stimulation no. 1 nitrogen gas frac on zone no. 1; (3) supporting material and procedures for stimulation no. 2 in zone no. 1 using liquid CO{sub 2}; (4) supporting material and procedures for frac no. 3 on zone no.1 using nitrogen foam and proppant; (5) supporting material and procedures for stimulation no. 4 in zones 2--3 and 4 using nitrogen foam and proppant; (6) supporting materials and procedures for stimulation no. 5 in zones 5 and 8; and (7) fracture diagnostics reports and supporting materials.

  6. National Biomedical Tracer Facility (NBTF). Project definition study: Phase I

    Energy Technology Data Exchange (ETDEWEB)

    Lagunas-Solar, M.C.

    1995-02-15

    This report describes a five-year plan for the construction and commissioning of a reliable and versatile NBTF facility for the production of high-quality, high-yield radioisotopes for research, biomedical, and industrial applications. The report is organized in nine sections providing, in consecutive order, responses to the nine questions posed by the U.S. Department of Energy in its solicitation for the NBTF Project Definition Study. In order to preserve direct correspondence (e.g., Sec. 3 = 3rd item), this Introduction is numbered {open_quotes}0.{close_quotes} Accelerator and facility designs are covered in Section 1 (Accelerator Design) and Section 2 (Facility Design). Preliminary estimates of capital costs are detailed in Section 3 (Design and Construction Costs). Full licensing requirements, including federal, state, and local ordinances, are discussed in Section 4 (Permits). A plan for the management of hazardous materials to be generated by NBTF is presented in Section 5 (Waste Management). An evaluation of NBTF`s economic viability and its potential market impact is detailed in Section 6(Business Plan), and is complemented by the plans in Section 7 (Operating Plan) and Section 8 (Radioisotope Plan). Finally, a plan for NBTF`s research, education, and outreach programs is presented in Section 9 (Research and Education Programs).

  7. The fault monitoring and diagnosis knowledge-based system for space power systems: AMPERES, phase 1

    Science.gov (United States)

    Lee, S. C.

    1989-01-01

    The objective is to develop a real time fault monitoring and diagnosis knowledge-based system (KBS) for space power systems which can save costly operational manpower and can achieve more reliable space power system operation. The proposed KBS was developed using the Autonomously Managed Power System (AMPS) test facility currently installed at NASA Marshall Space Flight Center (MSFC), but the basic approach taken for this project could be applicable for other space power systems. The proposed KBS is entitled Autonomously Managed Power-System Extendible Real-time Expert System (AMPERES). In Phase 1 the emphasis was put on the design of the overall KBS, the identification of the basic research required, the initial performance of the research, and the development of a prototype KBS. In Phase 2, emphasis is put on the completion of the research initiated in Phase 1, and the enhancement of the prototype KBS developed in Phase 1. This enhancement is intended to achieve a working real time KBS incorporated with the NASA space power system test facilities. Three major research areas were identified and progress was made in each area. These areas are real time data acquisition and its supporting data structure; sensor value validations; development of inference scheme for effective fault monitoring and diagnosis, and its supporting knowledge representation scheme.

  8. Image/patient registration from (partial) projection data by the Fourier phase matching method

    International Nuclear Information System (INIS)

    Weiguo Lu; You, J.

    1999-01-01

    A technique for 2D or 3D image/patient registration, PFPM (projection based Fourier phase matching method), is proposed. This technique provides image/patient registration directly from sequential tomographic projection data. The method can also deal with image files by generating 2D Radon transforms slice by slice. The registration in projection space is done by calculating a Fourier invariant (FI) descriptor for each one-dimensional projection datum, and then registering the FI descriptor by the Fourier phase matching (FPM) method. The algorithm has been tested on both synthetic and experimental data. When dealing with translated, rotated and uniformly scaled 2D image registration, the performance of the PFPM method is comparable to that of the IFPM (image based Fourier phase matching) method in robustness, efficiency, insensitivity to the offset between images, and registration time. The advantages of the former are that subpixel resolution is feasible, and it is more insensitive to image noise due to the averaging effect of the projection acquisition. Furthermore, the PFPM method offers the ability to generalize to 3D image/patient registration and to register partial projection data. By applying patient registration directly from tomographic projection data, image reconstruction is not needed in the therapy set-up verification, thus reducing computational time and artefacts. In addition, real time registration is feasible. Registration from partial projection data meets the geometry and dose requirements in many application cases and makes dynamic set-up verification possible in tomotherapy. (author)

  9. Native Fish Sanctuary Project - Sanctuary Development Phase, 2007 Annual Report

    Science.gov (United States)

    Mueller, Gordon A.

    2007-01-01

    Notable progress was made in 2007 toward the development of native fish facilities in the Lower Colorado River Basin. More than a dozen facilities are, or soon will be, online to benefit native fish. When this study began in 2005 no self-supporting communities of either bonytail or razorback sucker existed. Razorback suckers were removed from Rock Tank in 1997 and the communities at High Levee Pond had been compromised by largemouth bass in 2004. This project reversed that trend with the establishment of the Davis Cove native fish community in 2005. Bonytail and razorback sucker successfully produced young in Davis Cove in 2006. Bonytail successfully produced young in Parker Dam Pond in 2007, representing the first successful sanctuary established solely for bonytail. This past year, Three Fingers Lake received 135 large razorback suckers, and Federal and State agencies have agreed to develop a cooperative management approach dedicating a portion of that lake toward grow-out and (or) the establishment of another sanctuary. Two ponds at River's Edge Golf Course in Needles, California, were renovated in June and soon will be stocked with bonytail. Similar activities are taking place at Mohave Community College, Cerbat Cliffs Golf Course, Cibola High Levee Pond, Office Cove, Emerald Canyon Golf Course, and Bulkhead Cove. Recruitment can be expected as fish become sexually mature at these facilities. Flood-plain facilities have the potential to support 6,000 adult razorback suckers and nearly 20,000 bonytail if native fish management is aggressively pursued. This sanctuary project has assisted agencies in developing 15 native fish communities by identifying specific resource objectives for those sites, listing and prioritizing research opportunities and needs, and strategizing on management approaches through the use of resource-management plans. Such documents have been developed for Davis Cove, Cibola High Levee Pond, Parker Dam Pond, and Three Fingers Lake. We

  10. A Systematic Modelling Framework for Phase Transfer Catalyst Systems

    DEFF Research Database (Denmark)

    Anantpinijwatna, Amata; Sales-Cruz, Mauricio; Hyung Kim, Sun

    2016-01-01

    Phase-transfer catalyst systems contain two liquid phases, with a catalyst (PTC) that transfers between the phases, driving product formation in one phase and being regenerated in the other phase. Typically the reaction involves neutral species in an organic phase and regeneration involves ions i....... The application of the framework is made to two cases in order to highlight the performance and issues of activity coefficient models for predicting design and operation and the effects when different organic solvents are employed....

  11. ASDEX-UG. ASDEX upgrade project proposal. Phase 2

    International Nuclear Information System (INIS)

    1983-05-01

    The objective of ASDEX UG is to investigate the problems relating to tokamak divertor physics and the boundary layer of hot plasmas which cannot be covered otherwise by either ASDEX or other EUROPEAN tokamaks, including JET, but whose investigation is indispensable for NET and INTOR. The configuration of ASDEX UG is changed as compared with ASDEX due to the requirement that all poloidal field coils are located outside the toroidal field magnet. This leads to a highly elongated D-shaped plasma with an ''open'' divertor, which does not allow to close the divertor chamber by such simple means as in ASDEX. In section 2, the aims of ASDEX UG are repeated briefly and the essential features and parameters of the tokamak system are summarized. The summary includes an overview of the tokamak design, the time schedule of design and construction concluding with the estimated investment cost and manpower required. In section 3 the tokamak system components are treated. The circuits and energy supply for the different electrical components are described in section 4. Auxiliary heating requirements and methods are discussed in section 5. Section 6 presents a survey over the periphery of the tokamak system including preparation of the building and radiation shielding. Section 7 outlines the physical programme. Section 8 is devoted to diagnostics. Finally, the principal concepts for control, data acquisition and handling are outlined in section 9. (orig./AH)

  12. Phase tracking system for ultra narrow bandwidth applications

    NARCIS (Netherlands)

    Hill, M.T.; Cantoni, A.

    2002-01-01

    Recent advances make it possible to mitigate a number of drawbacks of conventional phase locked loops. These advances permit the design of phase tracking systems with much improved characteristics that are sought after in modern communication system applications. A new phase tracking system is

  13. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  14. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-12-01

    BNL is developing and implementing the project ``Geographic Information System (GIS) for Long Island`` to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ``Feasibility of a Geographic Information System for Long Island.`` It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP).

  15. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    International Nuclear Information System (INIS)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-01-01

    BNL is developing and implementing the project ''Geographic Information System (GIS) for Long Island'' to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ''Feasibility of a Geographic Information System for Long Island.'' It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP)

  16. Phase 2 : evaluation of the national crash experience : comparison of CARDfile national motor vehicle accident projections with projections from other data bases

    Science.gov (United States)

    1997-01-01

    The purpose of this Phase 2 Study is to compare national motor vehicle accident projections : made from the Crash Avoidance Research Data base (CARDfile) with national motor : vehicle accident projections made from other data bases. For the most part...

  17. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  18. Phase retrieval with the reverse projection method in the presence of object's scattering

    International Nuclear Information System (INIS)

    Wang, Zhili; Gao, Kun; Wang, Dajiang

    2017-01-01

    X-ray grating interferometry can provide substantially increased contrast over traditional attenuation-based techniques in biomedical applications, and therefore novel and complementary information. Recently, special attention has been paid to quantitative phase retrieval in X-ray grating interferometry, which is mandatory to perform phase tomography, to achieve material identification, etc. An innovative approach, dubbed “Reverse Projection” (RP), has been developed for quantitative phase retrieval. The RP method abandons grating scanning completely, and is thus advantageous in terms of higher efficiency and reduced radiation damage. Therefore, it is expected that this novel method would find its potential in preclinical and clinical implementations. Strictly speaking, the reverse projection method is applicable for objects exhibiting only absorption and refraction. In this contribution, we discuss the phase retrieval with the reverse projection method for general objects with absorption, refraction and scattering simultaneously. Especially, we investigate the influence of the object's scattering on the retrieved refraction signal. Both theoretical analysis and numerical experiments are performed. The results show that the retrieved refraction signal is the product of object's refraction and scattering signals for small values. In the case of a strong scattering, the reverse projection method cannot provide reliable phase retrieval. Those presented results will guide the use of the reverse projection method for future practical applications, and help to explain some possible artifacts in the retrieved images and/or reconstructed slices. - Highlights: • Accurate phase retrieval by the reverse projection method without object's scattering. • Retrieved refraction signal contaminated by the object's scattering. • Refraction signal underestimated by the reverse projection method. • Guide the use of the reverse projection method for

  19. National Unmanned Aircraft Systems Project Office

    Science.gov (United States)

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  20. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  1. The Earth System Grid Federation (ESGF) Project

    Science.gov (United States)

    Carenton-Madiec, Nicolas; Denvil, Sébastien; Greenslade, Mark

    2015-04-01

    The Earth System Grid Federation (ESGF) Peer-to-Peer (P2P) enterprise system is a collaboration that develops, deploys and maintains software infrastructure for the management, dissemination, and analysis of model output and observational data. ESGF's primary goal is to facilitate advancements in Earth System Science. It is an interagency and international effort led by the US Department of Energy (DOE), and co-funded by National Aeronautics and Space Administration (NASA), National Oceanic and Atmospheric Administration (NOAA), National Science Foundation (NSF), Infrastructure for the European Network of Earth System Modelling (IS-ENES) and international laboratories such as the Max Planck Institute for Meteorology (MPI-M) german Climate Computing Centre (DKRZ), the Australian National University (ANU) National Computational Infrastructure (NCI), Institut Pierre-Simon Laplace (IPSL), and the British Atmospheric Data Center (BADC). Its main mission is to support current CMIP5 activities and prepare for future assesments. The ESGF architecture is based on a system of autonomous and distributed nodes, which interoperate through common acceptance of federation protocols and trust agreements. Data is stored at multiple nodes around the world, and served through local data and metadata services. Nodes exchange information about their data holdings and services, trust each other for registering users and establishing access control decisions. The net result is that a user can use a web browser, connect to any node, and seamlessly find and access data throughout the federation. This type of collaborative working organization and distributed architecture context en-lighted the need of integration and testing processes definition to ensure the quality of software releases and interoperability. This presentation will introduce the ESGF project and demonstrate the range of tools and processes that have been set up to support release management activities.

  2. Multifunctional Aerogel Thermal Protection Systems for Hypersonic Vehicles, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall objective of the Phase II project is to develop lightweight reinforced aerogel materials for use as the core structural insulation material in...

  3. Recession-Tolerant Sensors for Thermal Protection Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The Phase II project will develop a suite of diagnostic sensors using Direct Write technology to measure temperature, surface recession depth, and heat flux of an...

  4. Fiber Optic Sensor System for Cryogenic Fuel Measurement, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase I project will address the feasibility of using a fiber Bragg grating array as a means of detecting liquid and slush hydrogen in gravity and zero...

  5. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  6. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    International Nuclear Information System (INIS)

    Matson, D M; Hyers, R W; Volkmann, T; Fecht, H-J

    2011-01-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  7. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    Science.gov (United States)

    Matson, D. M.; Hyers, R. W.; Volkmann, T.; Fecht, H.-J.

    2011-12-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  8. New Project System for Undergraduate Electronic Engineering

    Science.gov (United States)

    Chiu, Dirk M.; Chiu, Shen Y.

    2005-01-01

    A new approach to projects for undergraduate electronic engineering in an Australian university has been applied successfully for over 10 years. This approach has a number of projects running over three year period. Feedback from past graduates and their managers has confirmed that these projects train the students well, giving them the ability…

  9. Fuel cell power systems for remote applications. Phase 1 final report and business plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

  10. Project SAFE. Update of the SFR-1 safety assessment. Phase 1

    International Nuclear Information System (INIS)

    Andersson, Johan; Riggare, P.; Skagius, K.

    1998-10-01

    SFR-1 is a facility for disposal of low-level radioactive operational waste from the nuclear power plants in Sweden. Low-level radioactive waste from industry, medicine, and research is also disposed in SFR-1. The facility is situated in bedrock beneath the Baltic Sea, 1 km off the coast near the Forsmark nuclear power plant. SFR-1 was built between the years 1983 and 1988. An assessment of the long-term performance of the facility was included in the vast documentation that was a part of the application for an operational license. The assessment was presented in the form of a final safety report. In the operational licence for SFR-1 it is stated that renewed safety assessments should be carried out at least each ten years. In order to meet this demand SKB has launched a special project, SAFE (Safety Assessment of Final Disposal of Operational Radioactive Waste). The aim of the project is to update the safety analysis and to prepare a safety report that will be presented to the Swedish authorities not later than year 2000. Project SAFE is divided into three phases. The first phase is a prestudy, and the results of the prestudy are given in this report. The aim of the prestudy is to identify issues where additional studies would improve the basis for the updated safety analysis as well as to suggest how these studies should be carried out. The work has been divided into six different topics, namely the inventory, the near field, the far field, the biosphere, radionuclide transport calculations and scenarios. For each topic the former safety reports and regulatory reviews are scrutinised and needs for additional work is identified. The evaluations are given in appendices covering the respective topics. The main report is a summary of the appendices with a more stringent description of the repository system and the processes that are of interest and therefore should be addressed in an updated safety assessment. However, it should be pointed out that one of the

  11. Exploration Medical System Demonstration (EMSD) Project

    Science.gov (United States)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  12. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  13. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    Science.gov (United States)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  14. Fringe order error in multifrequency fringe projection phase unwrapping: reason and correction.

    Science.gov (United States)

    Zhang, Chunwei; Zhao, Hong; Zhang, Lu

    2015-11-10

    A multifrequency fringe projection phase unwrapping algorithm (MFPPUA) is important to fringe projection profilometry, especially when a discontinuous object is measured. However, a fringe order error (FOE) may occur when MFPPUA is adopted. An FOE will result in error to the unwrapped phase. Although this kind of phase error does not spread, it brings error to the eventual 3D measurement results. Therefore, an FOE or its adverse influence should be obviated. In this paper, reasons for the occurrence of an FOE are theoretically analyzed and experimentally explored. Methods to correct the phase error caused by an FOE are proposed. Experimental results demonstrate that the proposed methods are valid in eliminating the adverse influence of an FOE.

  15. Computation of multiphase systems with phase field models

    International Nuclear Information System (INIS)

    Badalassi, V.E.; Ceniceros, H.D.; Banerjee, S.

    2003-01-01

    Phase field models offer a systematic physical approach for investigating complex multiphase systems behaviors such as near-critical interfacial phenomena, phase separation under shear, and microstructure evolution during solidification. However, because interfaces are replaced by thin transition regions (diffuse interfaces), phase field simulations require resolution of very thin layers to capture the physics of the problems studied. This demands robust numerical methods that can efficiently achieve high resolution and accuracy, especially in three dimensions. We present here an accurate and efficient numerical method to solve the coupled Cahn-Hilliard/Navier-Stokes system, known as Model H, that constitutes a phase field model for density-matched binary fluids with variable mobility and viscosity. The numerical method is a time-split scheme that combines a novel semi-implicit discretization for the convective Cahn-Hilliard equation with an innovative application of high-resolution schemes employed for direct numerical simulations of turbulence. This new semi-implicit discretization is simple but effective since it removes the stability constraint due to the nonlinearity of the Cahn-Hilliard equation at the same cost as that of an explicit scheme. It is derived from a discretization used for diffusive problems that we further enhance to efficiently solve flow problems with variable mobility and viscosity. Moreover, we solve the Navier-Stokes equations with a robust time-discretization of the projection method that guarantees better stability properties than those for Crank-Nicolson-based projection methods. For channel geometries, the method uses a spectral discretization in the streamwise and spanwise directions and a combination of spectral and high order compact finite difference discretizations in the wall normal direction. The capabilities of the method are demonstrated with several examples including phase separation with, and without, shear in two and three

  16. Systems Engineering Applications for Small Business Innovative Research (SBIR) Projects

    Science.gov (United States)

    2012-09-01

    Engineering processes within the SBIR community. Information was collected from multiple organizations throughout the SBIR community to support this research...Force by Program Executive Officers, Technolgy Directorates, Air Logistics Centers and Test Centers. SBIR projects are developed in three phases...found to be associated with SBIR projects and varied among organizations. Thus it became essential to conduct interviews to gather the information

  17. Maqarin natural analogue project: Phase IV. Reconnaissance mission report (April 28 to May 7, 1999)

    Energy Technology Data Exchange (ETDEWEB)

    Smellie, J.A.T. [ed.] [Conterra AB, Uppsala (Sweden)

    2000-08-01

    Final planning of the Technical Proposal for Phase IV of the Maqarin Natural Analogue Project was preceded by a ten day Reconnaissance Mission to the Jordan sites. The main objective of this mission was to: i) allow new organisations within the project to become familiar with the geological context of the Maqarin and Central Jordan sites and also to appreciate the prevailing technical and logistical limitations, ii) carry out limited field investigations, and iii) based on the experience from these two points, provide the opportunity to finalise the Maqarin Phase IV Technical Proposal. This report details the results of the mission.

  18. Maqarin natural analogue project: Phase IV. Reconnaissance mission report (April 28 to May 7, 1999)

    International Nuclear Information System (INIS)

    Smellie, J.A.T.

    2000-08-01

    Final planning of the Technical Proposal for Phase IV of the Maqarin Natural Analogue Project was preceded by a ten day Reconnaissance Mission to the Jordan sites. The main objective of this mission was to: i) allow new organisations within the project to become familiar with the geological context of the Maqarin and Central Jordan sites and also to appreciate the prevailing technical and logistical limitations, ii) carry out limited field investigations, and iii) based on the experience from these two points, provide the opportunity to finalise the Maqarin Phase IV Technical Proposal. This report details the results of the mission

  19. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  20. Data and analyses of phase relations in the Ce-Fe-Sb ternary system.

    Science.gov (United States)

    Zhu, Daiman; Xu, Chengliang; Li, Changrong; Guo, Cuiping; Zheng, Raowen; Du, Zhenmin; Li, Junqin

    2018-02-01

    These data and analyses support the research article "Experimental study on phase relations in the Ce-Fe-Sb ternary system" Zhu et al. (2017) [1]. The data and analyses presented here include the experimental results of XRD, SEM and EPMA for the determination of the whole liquidus projection and the isothermal section at 823 K in the Ce-Fe-Sb system. All the results enable the understanding of the constituent phases and the solidification processes of the as-cast alloys as well as the phase relations and the equilibrium regions at 823 K in the Ce-Fe-Sb ternary system over the entire composition.

  1. A phased approach to cooperative environmental management R ampersand D projects with Russian institutes

    International Nuclear Information System (INIS)

    Matalucci, R.V.; Albert, T.E.

    1994-01-01

    An important aspect of technology exchange between the US and the Former Society Union (FSU) countries is the identification and implementation of cooperative projects that are mutually beneficial. The US Department of Energy (DOE) and its national laboratories have established a four-phase approach to identify and further develop Russian technologies that could contribute to solving DOE environmental management problems. Following an initial screening and identification of potential technologies, the country-to-country interaction is formally initiated in the first phase through a small-scale pilot project study. This phase consists of an evaluation of the specific technology for DOE applications, and provides an opportunity for both US and Russian scientists and engineers to validate the use of the technology for a specific DOE requirement. The successful completion of this phase establishes the basis for continuing the technology development into the second phase, which includes laboratory testing in Russia. In the third phase, the technology is laboratory tested in the US, most likely at those DOE national laboratories having the capability and greatest interest in the particular technology area. The fourth and final phase consist of a commercialization process that establishes a partnership with a US business to finalize development of the technology and to prepare for implementation within the DOE complex. An example of this phased approach is a current high-level waste separation cooperative project between the Khlopin Radium Institute and the DOE through Sandia National Laboratories (SNL) and Science Applications International Corporation (SAIC). This effort has not only enhanced separations technology for the DOE, but has also provided an example of a working process for future cooperative projects

  2. Stability of Laves Phases in the Cr Zr System

    Czech Academy of Sciences Publication Activity Database

    Pavlů, Jana; Vřešťál, Jan; Šob, Mojmír

    2009-01-01

    Roč. 33, č. 2 (2009), s. 382-387 ISSN 0364-5916 R&D Projects: GA ČR GA106/07/1078 Institutional research plan: CEZ:AV0Z20410507 Keywords : ab initio calculations * Laves phases * phase diagrams Subject RIV: BM - Solid Matter Physics ; Magnetism Impact factor: 1.904, year: 2009

  3. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  4. Phase coexistence and line tension in ternary lipid systems

    NARCIS (Netherlands)

    Idema, T.; Leeuwen, van J.M.J.; Storm, C.

    2009-01-01

    The ternary system consisting of cholesterol, a saturated lipid, and an unsaturated one exhibits a rich phase behavior with multiple phase coexistence regimes. Remarkably, phase separation even occurs when each of the three binary systems consisting of two of these components is a uniform mixture.

  5. X-ray phase radiography and tomography with grating interferometry and the reverse projection technique

    International Nuclear Information System (INIS)

    Wang, Zhili; Gao, Kun; Ge, Xin; Wu, Zhao; Chen, Heng; Wang, Shenghao; Wu, Ziyu; Zhu, Peiping; Yuan, Qingxi; Huang, Wanxia; Zhang, Kai

    2013-01-01

    X-ray grating interferometry provides substantially increased contrast over conventional absorption-based imaging methods, and therefore new and complementary information. Compared with other phase-contrast imaging techniques, x-ray grating interferometry can overcome some of the problems that have impaired the applications of x-ray phase-contrast radiography and phase tomography. Recently, special attention has been paid to the development of quantitative phase retrieval methods, which is mandatory to perform x-ray phase tomography, to achieve material identification, to differentiate distinct tissues, etc. Typically, the phase-stepping approach has been utilized for phase retrieval in grating interferometry. This method requires a grating scanning and acquisition of multiple radiographic projections, and therefore is disadvantageous in terms of imaging speed and radiation damage. Here we present an innovative, highly sensitive approach, dubbed ‘reverse projection’ (RP), for quantitative phase retrieval. Compared with the phase-stepping approach, the present RP method abandons grating scanning completely, and thus is advantageous due to its much higher efficiency and the reduced radiation dose, without the degradation of reconstruction quality. This review presents a detailed explanation of the principle of the RP method. Both radiography and phase tomography experiments are performed to validate the RP method. We believe that this new technique will find widespread applications in biomedical imaging and in vivo studies. (paper)

  6. Development of the digital design environment ProjectWise(TM) - phase 1.

    Science.gov (United States)

    2017-04-28

    The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...

  7. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  8. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  9. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  10. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  11. Solving Conic Systems via Projection and Rescaling

    OpenAIRE

    Pena, Javier; Soheili, Negar

    2015-01-01

    We propose a simple projection and rescaling algorithm to solve the feasibility problem \\[ \\text{ find } x \\in L \\cap \\Omega, \\] where $L$ and $\\Omega$ are respectively a linear subspace and the interior of a symmetric cone in a finite-dimensional vector space $V$. This projection and rescaling algorithm is inspired by previous work on rescaled versions of the perceptron algorithm and by Chubanov's projection-based method for linear feasibility problems. As in these predecessors, each main it...

  12. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  13. Power and phase monitoring system for the lower hybrid phased array heating system on ATC machine

    International Nuclear Information System (INIS)

    Reed, B.W.

    1975-01-01

    A four waveguide phased array slow wave structure has been constructed to couple microwave energy into plasma in the ATC Tokamac at Princeton. Theory has indicated that the coupling of power into the plasma column is a strong function of the imposed fourier spectrum at the antenna aperture. To optimize heating, and to verify theoretical results, a precision amplitude and phase monitoring system has been designed and constructed. The system data output is routed to an IBM 1800 computer where the fourier spectrum in n/sub parallel/ space is computed for discrete increments of time during an RF pulse. Computer output data is used to update the adjustment of transmission line parameters in between pulses

  14. System For Characterizing Three-Phase Brushless dc Motors

    Science.gov (United States)

    Howard, David E.; Smith, Dennis A.

    1996-01-01

    System of electronic hardware and software developed to automate measurements and calculations needed to characterize electromechanical performances of three-phase brushless dc motors, associated shaft-angle sensors needed for commutation, and associated brushless tachometers. System quickly takes measurements on all three phases of motor, tachometer, and shaft-angle sensor simultaneously and processes measurements into performance data. Also useful in development and testing of motors with not only three phases but also two, four, or more phases.

  15. Projective measurements in quantum and classical optical systems

    CSIR Research Space (South Africa)

    Roux, FS

    2014-09-01

    Full Text Available equally well to both classical and quantum optical systems. A projective measurement, in the context of quantum mechanics, is understood to be the process where a projection operator operates on some input state. Often this projection operator is composed...) Projective measurements in quantum and classical optical systems Filippus S. Roux* and Yingwen Zhang CSIR National Laser Centre, P.O. Box 395, Pretoria 0001, South Africa (Received 3 July 2014; published 22 September 2014) Experimental setups for the optical...

  16. Medical information, communication, and archiving system (MICAS): Phase II integration and acceptance testing

    Science.gov (United States)

    Smith, Edward M.; Wandtke, John; Robinson, Arvin E.

    1999-07-01

    The Medical Information, Communication and Archive System (MICAS) is a multi-modality integrated image management system that is seamlessly integrated with the Radiology Information System (RIS). This project was initiated in the summer of 1995 with the first phase being installed during the first half of 1997 and the second phase installed during the summer of 1998. Phase II enhancements include a permanent archive, automated workflow including modality worklist, study caches, NT diagnostic workstations with all components adhering to Digital Imaging and Communications in Medicine (DICOM) standards. This multi-vendor phased approach to PACS implementation is designed as an enterprise-wide PACS to provide images and reports throughout our healthcare network. MICAS demonstrates that aa multi-vendor open system phased approach to PACS is feasible, cost-effective, and has significant advantages over a single vendor implementation.

  17. Phase II Vault Testing of the Argonne RFID System

    International Nuclear Information System (INIS)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-01-01

    The U.S. Department of Energy (DOE) (Environmental Management (EM), Office of Packaging and Transportation (EM-45)) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase

  18. PHASE II VAULT TESTING OF THE ARGONNE RFID SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-06-25

    The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step

  19. Fringe-period selection for a multifrequency fringe-projection phase unwrapping method

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Jiang, Kejian

    2016-01-01

    The multi-frequency fringe-projection phase unwrapping method (MFPPUM) is a typical phase unwrapping algorithm for fringe projection profilometry. It has the advantage of being capable of correctly accomplishing phase unwrapping even in the presence of surface discontinuities. If the fringe frequency ratio of the MFPPUM is too large, fringe order error (FOE) may be triggered. FOE will result in phase unwrapping error. It is preferable for the phase unwrapping to be kept correct while the fewest sets of lower frequency fringe patterns are used. To achieve this goal, in this paper a parameter called fringe order inaccuracy (FOI) is defined, dominant factors which may induce FOE are theoretically analyzed, a method to optimally select the fringe periods for the MFPPUM is proposed with the aid of FOI, and experiments are conducted to research the impact of the dominant factors in phase unwrapping and demonstrate the validity of the proposed method. Some novel phenomena are revealed by these experiments. The proposed method helps to optimally select the fringe periods and detect the phase unwrapping error for the MFPPUM. (paper)

  20. Simplified absolute phase retrieval of dual-frequency fringe patterns in fringe projection profilometry

    Science.gov (United States)

    Lu, Jin; Mo, Rong; Sun, Huibin; Chang, Zhiyong; Zhao, Xiaxia

    2016-04-01

    In fringe projection profilometry, a simplified method is proposed to recover absolute phase maps of two-frequency fringe patterns by using a unique mapping rule. The mapping rule is designed from the rounded phase values to the fringe order of each pixel. Absolute phase can be recovered by the fringe order maps. Unlike the existing techniques, where the lowest frequency of dual- or multiple-frequency fringe patterns must be single, the presented method breaks the limitation and simplifies the procedure of phase unwrapping. Additionally, due to many issues including ambient light, shadow, sharp edges, step height boundaries and surface reflectivity variations, a novel framework of automatically identifying and removing invalid phase values is also proposed. Simulations and experiments have been carried out to validate the performances of the proposed method.

  1. The IAEA International Project on Innovative Reactors and Fuel Systems

    International Nuclear Information System (INIS)

    Mourogov, V.M.

    2001-01-01

    Full text: Nuclear power is faced with a dilemma. From one side, there is no doubt (particularly in our community) that nuclear power can play an outstanding role in a sustainable energy system worldwide due to its well known potential advantages. From the other side we have near-term nuclear power projections and prospects that are not so promising. In 2000 nuclear's share was 3% of total global electricity capacity additions which is more then three times lower that nuclear's 10% share of today's currently installed global capacity. It is also unfortunate that nuclear capacity additions in developing countries, where the main increase in energy demand is expected, are relatively insignificant compared to fossil and hydro capacity additions in recent years. Most near-term projections show no drastic changes in these recent trends How can we address this dilemma? If the nuclear power sector is to increase its role, it cannot simply continue to do what it has been doing and expect that factors outside its control, such as fossil fuel prices or environmental taxes, will change to make nuclear power's prospects more favorable. To reach a different outcome than that indicated by current near- and intermediate-term trends, something must be done within the nuclear community to generate new technological solutions. The challenge is to look to the future, to identify what innovations and new directions - that build upon and make good use of existing expertise and accomplishments - are most promising for helping nuclear power capture a growing share of a growing market. There are several challenges that we have to deal to facilitate large-scale global nuclear power development. These are: achieving economic competitiveness of new NPPs in most parts of the world; successfully demonstrating effective nuclear waste management; responsiveness to public safety concerns; responsiveness to proliferation concerns. And as a result building support for nuclear power among the public

  2. Developing Systems Engineering Skills Through NASA Summer Intern Project

    Science.gov (United States)

    Bhasin, Kul; Barritt, Brian; Golden, Bert; Knoblock, Eric; Matthews, Seth; Warner, Joe

    2010-01-01

    During the Formulation phases of the NASA Project Life Cycle, communication systems engineers are responsible for designing space communication links and analyzing their performance to ensure that the proposed communication architecture is capable of satisfying high-level mission requirements. Senior engineers with extensive experience in communications systems perform these activities. However, the increasing complexity of space systems coupled with the current shortage of communications systems engineers has led to an urgent need for expedited training of new systems engineers. A pilot program, in which college-bound high school and undergraduate students studying various engineering disciplines are immersed in NASA s systems engineering practices, was conceived out of this need. This rapid summerlong training approach is feasible because of the availability of advanced software and technology tools and the students inherent ability to operate such tools. During this pilot internship program, a team of college-level and recently-hired engineers configured and utilized various software applications in the design and analysis of communication links for a plausible lunar sortie mission. The approach taken was to first design the direct-to-Earth communication links for the lunar mission elements, then to design the links between lunar surface and lunar orbital elements. Based on the data obtained from these software applications, an integrated communication system design was realized and the students gained valuable systems engineering knowledge. This paper describes this approach to rapidly training college-bound high school and undergraduate engineering students from various disciplines in NASA s systems engineering practices and tools. A summary of the potential use of NASA s emerging systems engineering internship program in broader applications is also described.

  3. The Age-ility Project (Phase 1): Structural and functional imaging and electrophysiological data repository

    NARCIS (Netherlands)

    Karayanidis, F.; Keuken, M.C.; Wong, A.; Rennie, J.L.; de Hollander, G.; Cooper, P.S.; Fulham, W.R.; Lenroot, R.; Parsons, M.; Philips, N.; Michie, P.T.; Forstmann, B.U.

    2015-01-01

    Our understanding of the complex interplay between structural and functional organisation of brain networks is being advanced by the development of novel multi-modal analyses approaches. The Age-ility Project (Phase 1) data repository offers open access to structural MRI, diffusion MRI, and

  4. 76 FR 55947 - Industrial Relations Promotion Project, Phase II in Vietnam

    Science.gov (United States)

    2011-09-09

    ... DEPARTMENT OF LABOR Office of the Secretary Industrial Relations Promotion Project, Phase II in... to perform the type of activity to be funded.. DAI, through its Industrial Relations Promotion... provided a letter in support of continued funding of DAI/IRRP based, on part, on the importance of the...

  5. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  6. Phase and amplitude control system for Stanford Linear Accelerator

    International Nuclear Information System (INIS)

    Yoo, S.J.

    1983-01-01

    The computer controlled phase and amplitude detection system measures the instantaneous phase and amplitude of a 1 micro-second 2856 MHz rf pulse at a 180 Hz rate. This will be used for phase feedback control, and also for phase and amplitude jitter measurement. The program, which was originally written by John Fox and Keith Jobe, has been modified to improve the function of the system. The software algorithms used in the measurement are described, as is the performance of the prototype phase and amplitude detector system

  7. Phase Multistability in Coupled Oscillator Systems

    DEFF Research Database (Denmark)

    Mosekilde, Erik; Postnov, D.E.; Sosnovtseva, Olga

    2003-01-01

    along the orbit of the individual oscillator. Focusing on the mechanisms underlying the appearance of phase multistability, the paper examines a variety of phase-locked patterns. In particular we demonstrate the nested structure of synchronization regions for oscillations with multicrest wave forms...

  8. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  9. The phase detection and calculation for low hybrid wave phase-feedback control system

    International Nuclear Information System (INIS)

    Liu Qiang; Liang Hao; Zhou Yongzhao; Shan Jiafang

    2008-01-01

    A method of phase detection and calculation for low hybrid wave phase-feedback control system and the implementing the algorithms on DSP cores embedded in FPGA is introduced. By taking the advantages of matlab-aided design and algorithms optimization to carry out parallel processing of multi-channel phase calculation in FPGA with rich resources, the purposed of fast phase-feedback control is achieved under the need of complicated mathematical operations. (authors)

  10. Laser display system for multi-depth screen projection scenarios.

    Science.gov (United States)

    La Torre, J Pablo; Mayes, Nathan; Riza, Nabeel A

    2017-11-10

    Proposed is a laser projection display system that uses an electronically controlled variable focus lens (ECVFL) to achieve sharp and in-focus image projection over multi-distance three-dimensional (3D) conformal screens. The system also functions as an embedded distance sensor that enables 3D mapping of the multi-level screen platform before the desired laser scanned beam focused/defocused projected spot sizes are matched to the different localized screen distances on the 3D screen. Compared to conventional laser scanning and spatial light modulator (SLM) based projection systems, the proposed design offers in-focus non-distorted projection over a multi-distance screen zone with varying depths. An experimental projection system for a screen depth variation of 65 cm is demonstrated using a 633 nm laser beam, 3 KHz scan speed galvo-scanning mirrors, and a liquid-based ECVFL. As a basic demonstration, an in-house developed MATLAB based graphic user interface is deployed to work along with the laser projection display, enabling user inputs like text strings or predefined image projection. The user can specify projection screen distance, scanned laser linewidth, projected text font size, projected image dimensions, and laser scanning rate. Projected images are shown highlighting the 3D control capabilities of the display, including the production of a non-distorted image onto two-depths versus a distorted image via dominant prior-art projection methods.

  11. JSS project phase 4: Experimental and modelling studies of HLW glass dissolution in repository environments

    International Nuclear Information System (INIS)

    1987-10-01

    A goal of the JSS project was to develop a scientific basis for understanding the effects of waste package components, groundwater chemistry, and other repository conditions on glass dissolution behaviour, and to develop and refine a model for the processes governing glass dissolution. The fourth phase of the project, which was performed by the Hahn-Meitner-Institut, Berlin, FRG, dealt specifically with model development and application. Phase 4 also adressed whether basaltic glasses could serve as natural analogues for nuclear waste glasses, thus providing a means to test the capability of the model for long-term predictions. Additional experiments were performed in order to complete the data base necessary to model interactions between the glass and bentonite and between glass and steel corrosion products. More data on temperature, S/V, and pH dependence of the glass/water reaction were also collected. In this report, the data acquired during phase 4 are presented and discussed. (orig./DG)

  12. System identification on two-phase flow stability

    International Nuclear Information System (INIS)

    Wu Shaorong; Zhang Youjie; Wang Dazhong; Bo Jinghai; Wang Fei

    1996-01-01

    The theoretical principle, experimental method and results of interrelation analysis identification for the instability of two-phase flow are described. A completely new concept of test technology and method on two-phase flow stability was developed by using he theory of information science on system stability and system identification for two-phase flow stability in thermo-physics field. Application of this method would make it possible to identify instability boundary of two-phase flow under stable operation conditions of two-phase flow system. The experiment was carried out on the thermohydraulic test system HRTL-5. Using reverse repeated pseudo-random sequences of heating power as input signal sources and flow rate as response function in the test, the two-phase flow stability and stability margin of the natural circulation system are investigated. The effectiveness and feasibility of identifying two-phase flow stability by using this system identification method were experimentally demonstrated. Basic data required for mathematics modeling of two-phase flow and analysis of two-phase flow stability were obtained, which are useful for analyzing, monitoring of the system operation condition, and forecasting of two-phase flow stability in engineering system

  13. The coupling of thermochemistry and phase diagrams for group III-V semiconductor systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, T.J.

    1998-07-21

    The project was directed at linking the thermochemical properties of III-V compound semiconductors systems with the reported phase diagrams. The solid-liquid phase equilibrium problem was formulated and three approaches to calculating the reduced standard state chemical potential were identified and values were calculated. In addition, thermochemical values for critical properties were measured using solid state electrochemical techniques. These values, along with the standard state chemical potentials and other available thermochemical and phase diagram data, were combined with a critical assessment of selected III-V systems. This work was culminated with a comprehensive assessment of all the III-V binary systems. A novel aspect of the experimental part of this project was the demonstration of the use of a liquid encapsulate to measure component activities by a solid state emf technique in liquid III-V systems that exhibit high vapor pressures at the measurement temperature.

  14. P-T-x phase diagrams of MeF-UF4(Me=Li-Cs) systems

    International Nuclear Information System (INIS)

    Korenev, Yu.M.; Rykov, A.N.; Varkov, M.V.; Novoselova, A.V.

    1988-01-01

    Vapor composition and general pressure at three-phase equilibria in the MeF-UF 4 (Me=Li-Cs) systems are calculated using the values of independent component activities obtained earlier together with the data on fusibility diagrams. P-T and T-x projections of phase diagrams of these systems are constructed

  15. Virtual fringe projection system with nonparallel illumination based on iteration

    International Nuclear Information System (INIS)

    Zhou, Duo; Wang, Zhangying; Gao, Nan; Zhang, Zonghua; Jiang, Xiangqian

    2017-01-01

    Fringe projection profilometry has been widely applied in many fields. To set up an ideal measuring system, a virtual fringe projection technique has been studied to assist in the design of hardware configurations. However, existing virtual fringe projection systems use parallel illumination and have a fixed optical framework. This paper presents a virtual fringe projection system with nonparallel illumination. Using an iterative method to calculate intersection points between rays and reference planes or object surfaces, the proposed system can simulate projected fringe patterns and captured images. A new explicit calibration method has been presented to validate the precision of the system. Simulated results indicate that the proposed iterative method outperforms previous systems. Our virtual system can be applied to error analysis, algorithm optimization, and help operators to find ideal system parameter settings for actual measurements. (paper)

  16. Adaptive projective synchronization of different chaotic systems with nonlinearity inputs

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Pei Bing-Nan; Wang Xing-Yuan

    2012-01-01

    We investigate the projective synchronization of different chaotic systems with nonlinearity inputs. Based on the adaptive technique, sliding mode control method and pole assignment technique, a novel adaptive projective synchronization scheme is proposed to ensure the drive system and the response system with nonlinearity inputs can be rapidly synchronized up to the given scaling factor. (general)

  17. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  18. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  19. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  20. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  1. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 1 : outreach and commercialization of IRSV prototype.

    Science.gov (United States)

    2012-03-01

    The Integrated Remote Sensing and Visualization System (IRSV) was developed in Phase One of this project in order to : accommodate the needs of todays Bridge Engineers at the state and local level. Overall goals of this project are: : Better u...

  2. A phase one AR/C system design

    Science.gov (United States)

    Kachmar, Peter M.; Polutchko, Robert J.; Matusky, Martin; Chu, William; Jackson, William; Montez, Moises

    1991-01-01

    The Phase One AR&C System Design integrates an evolutionary design based on the legacy of previous mission successes, flight tested components from manned Rendezvous and Proximity Operations (RPO) space programs, and additional AR&C components validated using proven methods. The Phase One system has a modular, open architecture with the standardized interfaces proposed for Space Station Freedom system architecture.

  3. On analytical justification of phase synchronization in different chaotic systems

    International Nuclear Information System (INIS)

    Erjaee, G.H.

    2009-01-01

    In analytical or numerical synchronizations studies of coupled chaotic systems the phase synchronizations have less considered in the leading literatures. This article is an attempt to find a sufficient analytical condition for stability of phase synchronization in some coupled chaotic systems. The method of nonlinear feedback function and the scheme of matrix measure have been used to justify this analytical stability, and tested numerically for the existence of the phase synchronization in some coupled chaotic systems.

  4. Horonobe Underground Research Laboratory project. Synthesis of phase I investigation 2001-2005. Volume 'geoscientific research'

    International Nuclear Information System (INIS)

    Ota, Kunio; Abe, Hironobu; Kunimaru, Takanori

    2011-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe in Hokkaido, northern Japan. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. The present report summarises the results of the Phase I geoscientific research carried out from March 2001 to March 2005. Integration of the results from different disciplines ensures that the Phase I goals have been successfully achieved and identifies key issues that need to be addressed in Phases II and III. More importantly, efforts are made to summarise as many lessons learnt from the Phase I investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. Based on experiences of selecting the URL area and site in Horonobe Town, important factors that should be taken into consideration in such selection processes and their rationale are demonstrated. In the course of stepwise surface-based investigations, a number of achievements have been made, which can eventually provide examples of integrated methodologies for characterising the sedimentary formations. The relevant surface-based investigation techniques have thus been further developed. The Horonobe URL has been designed based on geoscientific information accumulated during the surface-based investigations and the plans for safe construction and operation of the URL have been defined in a feasible manner. In addition, a variety of environmental measures taken during Phase I have proved to be

  5. The Qinshan phase III project-a successful model of sino-canadian cooperation

    International Nuclear Information System (INIS)

    Pang, S.H.H.; Alikhan, S.; Gu Jun

    2005-01-01

    The Qinshan Phase III (CANDU) Project, the largest-scale cooperative project between China and Canada, was completed in 2003 well in advance of the schedule and 10% under budget. The Third Qinshan (Phase III) Nuclear Power Plant (TQNPP) was built in record times: Unit 1 achieved commercial operation on December 31, 2002 and Unit 2 on July 20, 2003, 43 days and 115 days ahead of schedule respectively. Improvements in design and construction methods allowed Unit 1 to be constructed in 51.5 months from First Concrete to Criticality - a record in China for nuclear power plants. The key factors are project management and project management tools, quality assurance, construction methods, electronic documentation with configuration control that provides up-to-date on-line information, CADDS design linked with material management and control. New design and construction techniques were introduced by combining conventional AECL practices with working experiences in China. The most advanced tools and techniques for achieving optimum construction quality, schedule and cost were used. Successful application of advanced project management methods and tools has benefited TQNPC in its subsequent plant operation, and the Chinese contractors in advancing their capabilities in future nuclear projects in China as well as enhancing their opportunities internationally. Excellent co-operation and teamwork within the integrated TQNPC/AECL Commissioning Team with well documented QA program, process and procedures also contributed to the remarkable success of the Project. AECL's initial assessment, based on lessons learned, showed that the project schedule could readily be reduced to 66 months and the capital costs reduced by 25% for a replication project. AECL is building on this experience and successful results of TQNPP in its Advanced CANDU Reactor TM (ACR TM ) ** design. (authors)

  6. Advanced Ground Systems Maintenance Enterprise Architecture Project

    Science.gov (United States)

    Perotti, Jose M. (Compiler)

    2015-01-01

    The project implements an architecture for delivery of integrated health management capabilities for the 21st Century launch complex. The delivered capabilities include anomaly detection, fault isolation, prognostics and physics based diagnostics.

  7. Prediction of phase equilibria in the In–Sb–Pb system

    Directory of Open Access Journals (Sweden)

    DUSKO MINIC

    2008-03-01

    Full Text Available Binary thermodynamic data, successfully used for phase diagram calculations of the binary systems In–Sb, Pb–Sb and In–Pb, were used for the prediction of the phase equilibria in the ternary In–Sb–Pb system. The predicted equilibrium phase diagram of the vertical Pb–InSb section was compared with the results of differential thermal analysis DTA and optical microscopy. The calculated phase diagram of the isothermal section at 300 °C was compared with the experimentally (SEM, EDX determined composition of phases in the chosen alloys after annealing. Very good agreement between the binary-based thermodynamic prediction and the experimental data was found in all cases. The calculated liquidus projection of the ternary In–Sb–Pb system is also presented.

  8. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  9. Fiber Optic Temperature Sensors for Thermal Protection Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In Phase 1, Intelligent Fiber Optic Systems Corporation (IFOS), in collaboration with North Carolina State University, successfully demonstrated a Fiber Bragg...

  10. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project (Translated document)

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Onoe, Hironori; Sato, Toshinori; Yasue, Kenichi; Asamori, Koichi; Niwa, Masakazu; Osawa, Hideaki; Nagae, Isako; Natsuyama, Ryoko; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Takeda, Masaki; Aoyagi, Kazuhei; Nakayama, Masashi; Miyakawa, Kazuya; Ito, Hiroaki; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2016-08-01

    We have synthesized the research results from the Mizunami/Horonobe Underground Research Laboratories (URLs) and geo-stability projects in the second mid-term research phase. This report can be used as a technical basis for the Nuclear Waste Management Organization of Japan/Regulator at each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High-quality construction techniques and field investigation methods have been developed and implemented, which will be directly applicable to the National Disposal Program (together with general assessments of hazardous natural events and processes). Acquisition of technical knowledge on decisions of partial backfilling and final closure from actual field experiments in the Mizunami/Horonobe URLs will be crucial as the main theme for the next phases. (author)

  11. Synthesized research report in the second mid-term research phase. Mizunami Underground Research Laboratory project, Horonobe Underground Research Laboratory project and geo-stability project

    International Nuclear Information System (INIS)

    Hama, Katsuhiro; Sasao, Eiji; Iwatsuki, Teruki; Saegusa, Hiromitsu; Sato, Toshinori; Umeda, Koji; Yasue, Kenichi; Asamori, Koichi; Osawa, Hideaki; Koide, Kaoru; Nagae, Isako; Natsuyama, Ryoko; Mizuno, Takashi; Fujita, Tomoo; Sasamoto, Hiroshi; Matsuoka, Toshiyuki; Yokota, Hideharu; Ishii, Eiichi; Aoyagi, Kazuhei; Nakayama, Masashi; Ito, Hiroaki; Tsusaka, Kimikazu; Ohyama, Takuya; Senba, Takeshi; Amano, Kenji

    2015-08-01

    We have synthesised the research results from Mizunami/Horonobe URLs and geo-stability projects in the second mid-term research phase. It could be used as technical bases for NUMO/Regulator in each decision point from siting to beginning of disposal (Principal Investigation to Detailed Investigation Phase). High quality construction techniques and field investigation methods have been developed and implemented and these will be directly applicable to the National Disposal Program (along with general assessments of hazardous natural events and processes). It will be crucial to acquire technical knowledge on decisions of partial backfilling and final closure by actual field experiments in Mizunami/Horonobe URLs as main themes for the next phases. (author)

  12. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  13. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    International Nuclear Information System (INIS)

    SPENCER, S.G.

    1999-01-01

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates

  14. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  15. Phase I Project: Fiber Optic Distributed Acoustic Sensing for Periodic Hydraulic Tests

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Matthew

    2017-12-31

    The extraction of heat from hot rock requires circulation of fluid through fracture networks. Because the geometry and connectivity of these fractures determines the efficiency of fluid circulation, many tools are used to characterize fractures before and after development of the reservoir. Under this project, a new tool was developed that allows hydraulic connectivity between geothermal boreholes to be identified. Nanostrain in rock fractures is measured using fiber optic distributed acoustic sensing (DAS). This strain is measured in one borehole in response to periodic pressure pulses induced in another borehole. The strain in the fractures represents hydraulic connectivity between wells. DAS is typically used at frequencies of Hz to kHz, but strain at mHz frequencies were measured for this project. The tool was demonstrated in the laboratory and in the field. In the laboratory, strain in fiber optic cables was measured in response to compression due to oscillating fluid pressure. DAS recorded strains as small as 10 picometer/m in response to 1 cm of water level change. At a fractured crystalline rock field site, strain was measured in boreholes. Fiber-optic cable was mechanically coupled borehole walls using pressured flexible liners. In one borehole 30 m from the oscillating pumping source, pressure and strain were measured simultaneously. The DAS system measured fracture displacement at frequencies of less than 1 mHz (18 min periods) and amplitudes of less than 1 nm, in response to fluid pressure changes of less 20 Pa (2 mm of water). The attenuation and phase shift of the monitored strain signal is indicative of the permeability and storage (compliance) of the fracture network that connects the two wells. The strain response as a function of oscillation frequency is characteristic of the hydraulic structure of the formation. This is the first application of DAS to the measurement of low frequency strain in boreholes. It has enormous potential for monitoring

  16. Social Analysis Systems (SAS2) - Phase III

    International Development Research Centre (IDRC) Digital Library (Canada)

    Scaling Up the International Impact of Action Research : Social Analysis ... up the international impact of action research : SAS phase 3; final technical report ... 000 Canadians abroad to work at the local level on various development issues.

  17. Automated NDE Flaw Mapping System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's Aircraft Aging and Durability Project (AADP) aims to ensure the safety of both commercial and military aviation aircraft. Non-destructive evaluation (NDE)...

  18. Development project for a residual life evaluation system in LWR NPPs

    International Nuclear Information System (INIS)

    Hervia, F.; Francia, L.

    1995-01-01

    Economic and safety factors have stimulated the interest of Spanish NPPs towards the optimisation of NPP Residual Life Management, and consequently the need to have access to tools to support such management. This requirement has been the subject of a project, the main objectives of which are the identification of the most significant ageing factors in NPPs and their corresponding parameters, and the development of an associated integrated monitoring system. Work on the project was started by UNESA in September 1992 and is partly financed from PIE funds. This paper gives a general description of the objectives and activities of Phase 1, the Definition of the Core Project, which is nearing completion, and Phase 2, the Application of the Integrated System in a Pilot Plant. Phase 1 has confirmed the technical feasibility of the system and its suitability as a tool for the continuous evaluation of the plant condition. Furthermore, it has raised issues of great interest to NPPs. The results and conclusions of Phase 1 are currently being used to define the most suitable scope for the development and implementation of the system in the pilot plant (Phase 2), so that all the main functions of the system are tested without incurring unnecessary costs

  19. Web Based Distributed Coastal Image Analysis System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This project develops Web based distributed image analysis system processing the Moderate Resolution Imaging Spectroradiometer (MODIS) data to provide decision...

  20. Liquidus Projection and Thermodynamic Modeling of a Sn-Ag-Zn System

    Science.gov (United States)

    Chen, Sinn-wen; Chiu, Wan-ting; Gierlotka, Wojciech; Chang, Jui-shen; Wang, Chao-hong

    2017-12-01

    Sn-Ag-Zn alloys are promising Pb-free solders. In this study, the Sn-Ag-Zn liquidus projection was determined, and the Sn-Ag-Zn thermodynamic modeling was developed. Various Sn-Ag-Zn alloys were prepared. Their as-cast microstructures and primary solidification phases were examined. The invariant reaction temperatures of the ternary Sn-Ag-Zn system were determined. The liquidus projection of the Sn-Ag-Zn ternary system was constructed. It was found that the Sn-Ag-Zn ternary system has eight primary solidification phases: ɛ2-AgZn3, γ-Ag5Zn8, β-AgZn, ζ-Ag4Sn, (Ag), ɛ1-Ag3Sn, β-(Sn) and (Zn) phases. There are eight ternary invariant reactions, and the liquid + (Ag) = β-AgZn + ζ-Ag4Sn reaction is of the highest temperature at 935.5 K. Thermodynamic modeling of the ternary Sn-Ag-Zn system was also carried out in this study based on the thermodynamic models of the three constituent binary systems and the experimentally determined liquidus projection. The liquidus projection and the isothermal sections are calculated. The calculated and experimentally determined liquidus projections are in good agreement.

  1. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  2. Phase-space networks of geometrically frustrated systems.

    Science.gov (United States)

    Han, Yilong

    2009-11-01

    We illustrate a network approach to the phase-space study by using two geometrical frustration models: antiferromagnet on triangular lattice and square ice. Their highly degenerated ground states are mapped as discrete networks such that the quantitative network analysis can be applied to phase-space studies. The resulting phase spaces share some comon features and establish a class of complex networks with unique Gaussian spectral densities. Although phase-space networks are heterogeneously connected, the systems are still ergodic due to the random Poisson processes. This network approach can be generalized to phase spaces of some other complex systems.

  3. Integrated thermal treatment system sudy: Phase 2, Results

    Energy Technology Data Exchange (ETDEWEB)

    Feizollahi, F.; Quapp, W.J.

    1995-08-01

    This report presents the second phase of a study on thermal treatment technologies. The study consists of a systematic assessment of nineteen thermal treatment alternatives for the contact-handled mixed low-level waste (MLLW) currently stored in the US Department of Energy complex. The treatment alternatives consist of widely varying technologies for safely destroying the hazardous organic components, reducing the volume, and preparing for final disposal of the MLLW. The alternatives considered in Phase 2 were innovative thermal treatments with nine types of primary processing units. Other variations in the study examined the effect of combustion gas, air pollution control system design, and stabilization technology for the treatment residues. The Phase 1 study, the results of which have been published as an interim report, examined ten initial thermal treatment alternatives. The Phase 2 systems were evaluated in essentially the same manner as the Phase 2 systems. The assumptions and methods were the same as for the Phase 1 study. The quantities, and physical and chemical compositions, of the input waste used in he Phase 2 systems differ from those in the Phase 1 systems, which were based on a preliminary waste input database developed at the onset of the Integrated Thermal Treatment System study. The inventory database used in the Phase 2 study incorporates the latest US Department of Energy information. All systems, both primary treatment systems and subsystem inputs, have now been evaluated using the same waste input (2,927 lb/hr).

  4. Integrated thermal treatment system sudy: Phase 2, Results

    International Nuclear Information System (INIS)

    Feizollahi, F.; Quapp, W.J.

    1995-08-01

    This report presents the second phase of a study on thermal treatment technologies. The study consists of a systematic assessment of nineteen thermal treatment alternatives for the contact-handled mixed low-level waste (MLLW) currently stored in the US Department of Energy complex. The treatment alternatives consist of widely varying technologies for safely destroying the hazardous organic components, reducing the volume, and preparing for final disposal of the MLLW. The alternatives considered in Phase 2 were innovative thermal treatments with nine types of primary processing units. Other variations in the study examined the effect of combustion gas, air pollution control system design, and stabilization technology for the treatment residues. The Phase 1 study, the results of which have been published as an interim report, examined ten initial thermal treatment alternatives. The Phase 2 systems were evaluated in essentially the same manner as the Phase 2 systems. The assumptions and methods were the same as for the Phase 1 study. The quantities, and physical and chemical compositions, of the input waste used in he Phase 2 systems differ from those in the Phase 1 systems, which were based on a preliminary waste input database developed at the onset of the Integrated Thermal Treatment System study. The inventory database used in the Phase 2 study incorporates the latest US Department of Energy information. All systems, both primary treatment systems and subsystem inputs, have now been evaluated using the same waste input (2,927 lb/hr)

  5. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  6. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  7. Technical realization of the VISA-2 Project, contract: 2.01/ I phase, Volume No. I

    International Nuclear Information System (INIS)

    1963-12-01

    Cooperation between the Institutes in Vinca and Saclay has started by carrying out the task 'Technical realization of the VISA-2 project' which should enable: obtaining new experimental spaces in the RA reactor with high fast neutron flux for sample irradiation; obtaining experience in reactor continual operation for few months at nominal power of 6.5 MW and increase of RA reactor utilization; solving the problem of activated channels and samples transport, problems of working in hot cells; obtaining irradiated samples for examining radiation effects first in Saclay and later in Vinca. The project is divided in three phases. Phase one covers the reconstruction of the RA reactor fuel channels according to the VISA-2 project demands. The second phase includes the activities related to measuring devices for measuring the temperatures at the incoming and outgoing heavy water in 5 VISA-2 channels, as well as temperature of the samples (55 thermocouples) and testing the channels and capsules after their insertion in the reactor. The third phase includes activities are related to problems of transport of radioactive channels and VISA-2 capsules, problems of cutting as well as packing and transporting of irradiated samples from Vinca to Saclay. This volume includes all the relevant documents for completing the task including contracts, needed preliminary calculations as well as safety analysis [sr

  8. Rooftop PV system. Final technical progress report, Phase II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    Under this four-year PV:BONUS Program, ECD and United Solar are developing and demonstrating two new lightweight flexible building integrated Photovoltaic (BIPV) modules specifically designed as exact replacements for conventional asphalt shingles and standing seam metal roofing. These modules can be economically and aesthetically integrated into new residential and commercial buildings, and address the even larger roofing replacement market. The modules are designed to be installed by roofing contractors without special training which minimizes the installation and balance of system costs. The modules will be fabricated from high-efficiency, multiple-junction a-Si alloy solar cells developed by ECD and United Solar. Under the Phase I Program, which ended in March 1994, we developed two different concept designs for rooftop PV modules: (1) the United Solar overlapping (asphalt shingle replacement) shingle-type modules and (2) the ECD metal roof-type modules. We also developed a plan for fabricating, testing and demonstrating these modules. Candidate demonstration sites for our rooftop PV modules were identified and preliminary engineering designs for these demonstrations were developed; a marketing study plan was also developed. The major objectives of the Phase II Program, which started in June 1994 was (1) to develop, test, and qualify these new rooftop modules; (2) to develop mechanical and electrical engineering specifications for the demonstration projects; and (3) to develop a marketing/commercialization plan.

  9. STTR Phase 1 Final Technical Report for Project Entitled "Developing a Mobile Torrefaction Machine"

    Energy Technology Data Exchange (ETDEWEB)

    James, Joseph J. [President, ATP

    2014-03-11

    The goal of this project, sponsored by Agri-Tech Producers, LLC (ATP), the small business grantee, was to determine if the torrefaction technology, developed by North Carolina State University (NCSU), which ATP has licensed, could be feasibly deployed in a mobile unit. The study adds to the area investigated, by having ATP’s STTR Phase I team give thoughtful consideration to how to use NCSU’s technology in a mobile unit. The findings by ATP’s team were that NCSU’s technology would best perform in units 30’ by 80’ (See Spec Sheet for the Torre-Tech 5.0 Unit in the Appendix) and the technical effectiveness and economic feasibility investigation suggested that such units were not easily, efficiently or safely utilized in a forest or farm setting. (Note rendering of possible mobile system in the Appendix) Therefore, the findings by ATP’s team were that NCSU’s technology could not feasibly be deployed as a mobile unit.

  10. Self-reliance and innovation of Qinshan phase II NPP project

    International Nuclear Information System (INIS)

    Ye Qizhen; Yang Lanhe

    2007-01-01

    This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II, in-between it contains new reactor core design, as well as related experimental and calculation analysis, especially for new reactor design produced fluid-induced vibration model test, theoretical analysis and testing in-built reactor; aiming at two-loop NSSS a series improvement made for safety systems and related safety analysis to enhance their reliability and redundancy; according to specialty of two-loop NSSS an optimization made for NPP parameters and design of related equipments, for the purpose to make the output of NPP maximal; design of main reactor building and T-G building also improved according to characteristics of two-loop NSSS and site conditions. CRDM and refueling machine are researched and manufactured on base of self-reliance, their performance are better than design requirements, large portion of key equipments are localized through different way. In construction first time realized the integrated erection of containment dome. During the commissioning non-nuclear steam driving of T-G set, as well as 500 kV high voltage rising using emergent diesel generator, etc. are carried out.In period of operation still continuous innovation and improvement are made, so that to keep the good record of operation. (authors)

  11. An applicable 5.8 GHz wireless power transmission system with rough beamforming to Project Loon

    Directory of Open Access Journals (Sweden)

    Chang-Jun Ahn

    2016-06-01

    Full Text Available In recent, Google proposed the Project Loon being developed with the mission of providing internet access to rural and remote areas using high-altitude balloons. In this paper, we describe an applicable prototype of 5.8 GHz wireless power transmission system with rough beamforming method to Project Loon. From the measurement results, transmit beamforming phased array antenna can transmit power more efficiently compared to a horn antenna and array antenna without beamforming with increasing the transmission distance. For the transmission distance of 1000 mm, transmit beamforming phased array antenna can obtain higher received power about 1.46 times compared to array antenna without transmit beamforming.

  12. Assessment of thermodynamic properties and phase diagram in the Ag–In–Pd system

    Czech Academy of Sciences Publication Activity Database

    Zemanová, A.; Semenova, O.; Kroupa, Aleš; Vřešťál, J.; Chandrasekaran, K.; Richter, K. W.; Ipser, H.

    2007-01-01

    Roč. 15, č. 1 (2007), s. 77-84 ISSN 0966-9795 R&D Projects: GA MŠk(CZ) OC 532.001 Institutional research plan: CEZ:AV0Z20410507 Keywords : phase diagrams * ternary alloy systems * prediction Subject RIV: BJ - Thermodynamics Impact factor: 2.219, year: 2007

  13. The system Ta-V-Si: Crystal structure and phase equilibria

    Czech Academy of Sciences Publication Activity Database

    Khan, A.U.; Brož, P.; Niu, H.Y.; Buršík, Jiří; Grytsiv, A.; Chen, X.-Q.; Giester, G.; Rogl, P.

    2012-01-01

    Roč. 187, - (2012), s. 114-123 ISSN 0022-4596 R&D Projects: GA MŠk(CZ) ED1.1.00/02.0068 Institutional research plan: CEZ:AV0Z20410507 Keywords : ternary alloy system * microstructure * phase diagram Subject RIV: BM - Solid Matter Physics ; Magnetism Impact factor: 2.040, year: 2012

  14. Robustification and Optimization in Repetitive Control For Minimum Phase and Non-Minimum Phase Systems

    Science.gov (United States)

    Prasitmeeboon, Pitcha

    Repetitive control (RC) is a control method that specifically aims to converge to zero tracking error of a control systems that execute a periodic command or have periodic disturbances of known period. It uses the error of one period back to adjust the command in the present period. In theory, RC can completely eliminate periodic disturbance effects. RC has applications in many fields such as high-precision manufacturing in robotics, computer disk drives, and active vibration isolation in spacecraft. The first topic treated in this dissertation develops several simple RC design methods that are somewhat analogous to PID controller design in classical control. From the early days of digital control, emulation methods were developed based on a Forward Rule, a Backward Rule, Tustin's Formula, a modification using prewarping, and a pole-zero mapping method. These allowed one to convert a candidate controller design to discrete time in a simple way. We investigate to what extent they can be used to simplify RC design. A particular design is developed from modification of the pole-zero mapping rules, which is simple and sheds light on the robustness of repetitive control designs. RC convergence requires less than 90 degree model phase error at all frequencies up to Nyquist. A zero-phase cutoff filter is normally used to robustify to high frequency model error when this limit is exceeded. The result is stabilization at the expense of failure to cancel errors above the cutoff. The second topic investigates a series of methods to use data to make real time updates of the frequency response model, allowing one to increase or eliminate the frequency cutoff. These include the use of a moving window employing a recursive discrete Fourier transform (DFT), and use of a real time projection algorithm from adaptive control for each frequency. The results can be used directly to make repetitive control corrections that cancel each error frequency, or they can be used to update a

  15. Sustainability certification systems as guidelines for early-phase urban design processes

    OpenAIRE

    Jensen, Lotte Bjerregaard; Bjerre, Lærke; Mansfelt, Lise

    2016-01-01

    The German Sustainable Building Council (Deutsche Gesellschaft für Nachhaltiges Bauen or DGNB) has one of the most comprehensive sustainability certification systems for urban districts (UD). Their explicit aim is that the system should impact the very earliest design decisions. The Technical University of Denmark has tested the DGNB-UD system in two experimental design projects for similar locations to find out how it can be used in the early-phase design process. This paper describes these ...

  16. Modeling of diffusional phase transformation in multi-component systems with stoichiometric phases

    Czech Academy of Sciences Publication Activity Database

    Svoboda, Jiří; Fischer, F. D.; Abart, R.

    2010-01-01

    Roč. 58, č. 8 (2010), s. 2905-2911 ISSN 1359-6454 R&D Projects: GA MŠk(CZ) OC10029 Institutional research plan: CEZ:AV0Z20410507 Keywords : Interdiffusion * Intermetallics * Phase transformation kinetics Subject RIV: BJ - Thermodynamics Impact factor: 3.781, year: 2010

  17. Single phase inverter for a three phase power generation and distribution system

    Science.gov (United States)

    Lindena, S. J.

    1976-01-01

    A breadboard design of a single-phase inverter with sinusoidal output voltage for a three-phase power generation and distribution system was developed. The three-phase system consists of three single-phase inverters, whose output voltages are connected in a delta configuration. Upon failure of one inverter the two remaining inverters will continue to deliver three-phase power. Parallel redundancy as offered by two three-phase inverters is substituted by one three-phase inverter assembly with high savings in volume, weight, components count and complexity, and a considerable increase in reliability. The following requirements must be met: (1) Each single-phase, current-fed inverter must be capable of being synchronized to a three-phase reference system such that its output voltage remains phaselocked to its respective reference voltage. (2) Each single-phase, current-fed inverter must be capable of accepting leading and lagging power factors over a range from -0.7 through 1 to +0.7.

  18. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    International Nuclear Information System (INIS)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan

  19. Project BASIC: Building Art Systems into Curriculum.

    Science.gov (United States)

    Benson, Cal; Doane, Mitzi

    1982-01-01

    Describes Duluth, Minnesota's interdisciplinary program, Project BASIC, which incorporates five major art forms into the elementary curriculum. Schools employ artists-in-residence and in-service training to expand teacher use of arts in the classroom. Results of a research study to measure gains in self-concept and creativity are included. (AM)

  20. MIDAS, prototype Multivariate Interactive Digital Analysis System, Phase 1. Volume 2: Diagnostic system

    Science.gov (United States)

    Kriegler, F. J.; Christenson, D.; Gordon, M.; Kistler, R.; Lampert, S.; Marshall, R.; Mclaughlin, R.

    1974-01-01

    The MIDAS System is a third-generation, fast, multispectral recognition system able to keep pace with the large quantity and high rates of data acquisition from present and projected sensors. A principal objective of the MIDAS Program is to provide a system well interfaced with the human operator and thus to obtain large overall reductions in turn-around time and significant gains in throughout. The hardware and software generated in Phase I of the over-all program are described. The system contains a mini-computer to control the various high-speed processing elements in the data path and a classifier which implements an all-digital prototype multivariate-Gaussian maximum likelihood decision algorithm operating 2 x 105 pixels/sec. Sufficient hardware was developed to perform signature extraction from computer-compatible tapes, compute classifier coefficients, control the classifier operation, and diagnose operation. Diagnostic programs used to test MIDAS' operations are presented.

  1. Feedback system of the RF phase in KEK-ATF linac

    Energy Technology Data Exchange (ETDEWEB)

    Okugi, T.; Hayano, H.; Kuriki, M.; Naito, T. [Accelerator Laboratory, High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)

    2000-07-01

    KEK-ATF linac is built in the Assembly Hall for TRISTAN project in 1991. The thermal condition of the hall is not good enough for a stable linac operation, because the temperature of the klystron gallery is drifted by 1degC within one day. RF phase is also drifted by 3-5deg of the S-band frequency in day and night. In order to control the RF phase, we installed RF phase detectors, which have S/H circuit in order to use for pulsed RF. By using the phase detector, an RF phase feedback system was tested. It was found that a stable klystron operation could be performed within the phase drift of {+-}0.5deg in a day. (author)

  2. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  3. Sources of project financing in health care systems.

    Science.gov (United States)

    Smith, D G; Wheeler, J R; Rivenson, H L; Reiter, K L

    2000-01-01

    Through discussions with chief financial officers of leading health care systems, insights are offered on preferences for project financing and development efforts. Data from these same systems provide at least anecdotal evidence in support of pecking-order theory.

  4. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  5. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  6. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  7. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  8. MOIDSS?- Mobile Online Intelligent Decision Support System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — GRID has had a successfully completed Phase I 'Mobile Online Intelligent Decision Support System' (MOIDSS). The system developed into a total solution that supports...

  9. Space-Ready Advanced Imaging System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II effort Toyon will increase the state-of-the-art for video/image systems. This will include digital image compression algorithms as well as system...

  10. Distributed Rocket Engine Testing Health Monitoring System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Leveraging the Phase I achievements of the Distributed Rocket Engine Testing Health Monitoring System (DiRETHMS) including its software toolsets and system building...

  11. Mars Ascent Vehicle Reaction Control System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — During this Phase I NASA program, Valley Tech Systems (VTS) will develop an innovative solid Reaction Control System (RCS) architecture concept design that can...

  12. Development of Phase Lock Loop System for Synchronisation of a ...

    African Journals Online (AJOL)

    Akorede

    KEYWORDS: Phase locked loop (PLL), grid synchronisation, simulations, PI regulator, hybrid system. .... system. AC. - D. C co nv erter. DC-DC converter. DC. - AC co nverter. Load ... The box named Discrete Transfer Fcn is the PI-regulator.

  13. Planning and reporting of Russian transmutation research projects within ISTC. Phase 2

    International Nuclear Information System (INIS)

    Conde, H.

    1998-11-01

    The present report about phase 2 of the SKI project on Planning and Reporting of Russian Transmutation Research Projects within ISTC is an update of the information given in the SKI report no 97:15 (Feb 1997) about phase 1 of the same project. The background information is partly repeated in the present report to avoid that the reader has to go back to the report of Phase 1 for information about the basis for the project. USA, EU, Japan, Republic of Korea and Norway are at present supporting the International Scientific and Technical Center (ISTC) in Moscow. The Centre gives funds to research projects of civilian interest to former nuclear weapon laboratories to counteract the risk of nuclear weapon proliferation by the emigration of former USSR technical and scientific experts to 'border countries' which are aiming towards the development of nuclear weapons. Before Sweden and Finland entered the EU, both countries gave national support to ISTC, in the case of Sweden 4 MUSD. Some of the projects which were funded by the Swedish national support to ISTC are still in progress. Nuclear technical concepts (i.e. Accelerator Transmutation of Nuclear Waste, ATW) have been proposed to incinerate and transmute long-lived radioactive nuclear waste to relax the time needed to store the waste in a geological repository. The named Russian experts are knowledgeable and well equipped of doing research in the different technical fields of relevance for the transmutation concepts. Thus, a number of ISTC projects have been initiated, and further ones have been proposed, to investigate different technical aspects of ATW with a result that a fair number of former weapon specialists have converted from military to peaceful civilian research. A similar centre STCU (The Scientific and Technical Centre of the Ukraine) has been set up in Kiev. Sweden has been active in promoting this Centre, which is supported by USA, Japan, Canada and recently also by EU. The present report describes the

  14. Planning and reporting of Russian transmutation research projects within ISTC. Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Conde, H. [Uppsala Univ. (Sweden). Dept. of Neutron Research; Gudowski, W. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Reactor and Neutron Physics; Liljenzin, J.O. [Chalmers Univ. of Technology, Goeteborg (Sweden). Dept. of Nuclear Chemistry; Mileikovsky, C. [Pully (Switzerland)

    1998-11-01

    The present report about phase 2 of the SKI project on Planning and Reporting of Russian Transmutation Research Projects within ISTC is an update of the information given in the SKI report no 97:15 (Feb 1997) about phase 1 of the same project. The background information is partly repeated in the present report to avoid that the reader has to go back to the report of Phase 1 for information about the basis for the project. USA, EU, Japan, Republic of Korea and Norway are at present supporting the International Scientific and Technical Center (ISTC) in Moscow. The Centre gives funds to research projects of civilian interest to former nuclear weapon laboratories to counteract the risk of nuclear weapon proliferation by the emigration of former USSR technical and scientific experts to `border countries` which are aiming towards the development of nuclear weapons. Before Sweden and Finland entered the EU, both countries gave national support to ISTC, in the case of Sweden 4 MUSD. Some of the projects which were funded by the Swedish national support to ISTC are still in progress. Nuclear technical concepts (i.e. Accelerator Transmutation of Nuclear Waste, ATW) have been proposed to incinerate and transmute long-lived radioactive nuclear waste to relax the time needed to store the waste in a geological repository. The named Russian experts are knowledgeable and well equipped of doing research in the different technical fields of relevance for the transmutation concepts. Thus, a number of ISTC projects have been initiated, and further ones have been proposed, to investigate different technical aspects of ATW with a result that a fair number of former weapon specialists have converted from military to peaceful civilian research. A similar centre STCU (The Scientific and Technical Centre of the Ukraine) has been set up in Kiev. Sweden has been active in promoting this Centre, which is supported by USA, Japan, Canada and recently also by EU. The present report describes the

  15. Advanced EVA Suit Camera System Development Project

    Science.gov (United States)

    Mock, Kyla

    2016-01-01

    The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was

  16. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  17. Implementing an EU system of accounting for ecosystems and their services. Initial proposals for the implementation of ecosystem services accounts (Report under phase 2 of the knowledge innovation project on an integrated system of natural capital and ecosystem services accounting in the EU)

    OpenAIRE

    LA NOTTE ALESSANDRA; VALLECILLO RODRIGUEZ SARA; POLCE CHIARA; ZULIAN GRAZIA; MAES JOACHIM

    2017-01-01

    The Knowledge Innovation Project on an Integrated system of Natural Capital and ecosystem services Accounting (KIP INCA) aims to work in line with the UN System of Environmental-Economic Accounting- Experimental Ecosystem Accounts (SEEA EEA) and also to propose how the approaches to accounting can be further developed based on experience in the EU. The Technical Recommendations of SEEA EEA make proposals on how to develop accounting tables of ecosystem extent, asset, condition and service sup...

  18. High frequency system project implementation plan

    International Nuclear Information System (INIS)

    Moon, L.L.

    1976-01-01

    The High Frequency System is a new mobile, digital diagnostic recording system for use at the Nevada Test Site. Many different kinds of event data will be digitized in real-time by this system, and these data will be recorded and stored for later read-out and transmission to NADCEN. The hardware and software requirements of the High Frequency System are examined, and the parameters of the system are proposed

  19. Radiation safety study for conventional facility and siting pre project phase of International Linear Collider

    International Nuclear Information System (INIS)

    Sanami, Toshiya; Ban, Syuichi; Sasaki, Shin-ichi

    2015-01-01

    The International Linear Collider (ILC) is a proposed high-energy collider consisting of two linear accelerators, two dumping rings, electron and positron sources, and a single colliding hall with two detectors. The total length and CMS energy of the ILC will be 31 km and 500 GeV, respectively (and 50 km and 1 TeV after future upgrade). The design of the ILC has entered the pre-project phase, which includes site-dependent design. Radiation safety design for the ILC is on-going as a part of conventional facility and siting activities of the pre-project phase. The thickness of a central wall of normal concrete is designed to be 3.5 m under a pessimistic assumption of beam loss. The beam loss scenario is under discussion. Experience and knowledge relating to shielding design and radiation control operational work at other laboratories are required. (authors)

  20. I. Final Report for DOE SBIR Phase I Project DE-SC0013795 Final Report for DOE SBIR Phase I Project DE-SC0013795 Microtron-based Compact, Portable Gamma-Ray Source

    Energy Technology Data Exchange (ETDEWEB)

    Abrams, Robert J. [Muons Inc., Batavia, IL (United States)

    2017-01-09

    Microtron-based Compact, Portable Gamma-Ray Source. The objective of Phase I of this project was to produce a conceptual design of a prototype compact microtron electron accelerator, which could be designed, built, and demonstrated in Phase II of the project. The conceptual design study included an analysis of the parameters of the microtron and its components, and the expected performance of the prototype microtron as a source of x-rays and/or RF neutrons in the MeV energy range. The major components of the microtron are the magnet, the accelerating system, the power system, the vacuum system, the control system, the beam extraction system and the targets to produce x-rays (and/or neutrons). Our objectives for the design of the prototype were for it to be compact, cost-effective, capable of producing high intensity x-ray (an/or neutron) fluxes. In addition, the prototype was to be easily assembled and disassembled so that components could be easily replaced. The main parameters for the prototype are the following: the range of electron kinetic energies, the output power, the RF frequency band (X-band, C-band, or S-Band), the type of injection (Type I or Type II), the magnet type, i.e. permanent magnet, electromagnet, or a hybrid combination of permanent and electromagnet. The results of the Phase I study and analysis for a prototype microtron are the following: The electron energy range can be varied from below 6 MeV to 9 MeV, the optimal frequency range is S-Band (2-4 GHz) RF frequency, Type II injection (described below), and the magnet type is the hybrid version. The prototype version will be capable of producing gamma ray doses of ~1800 R/min-m and neutron fluxes of up to ~6 x 1010 n/s with appropriate targets. The results of the Phase I study and analysis are provided below. The proposed Phase II plan was to demonstrate the prototype at low beam power. In the subsequent Phase III, high power tests would be performed, and the design of commercial

  1. Self-correction of projector nonlinearity in phase-shifting fringe projection profilometry.

    Science.gov (United States)

    Lü, Fuxing; Xing, Shuo; Guo, Hongwei

    2017-09-01

    In phase-shifting fringe projection profilometry, the luminance nonlinearity of the used projector has been recognized as one of the most crucial factors decreasing the measurement accuracy. To solve this problem, this paper presents a self-correcting technique that allows us to suppress the effect of the projector nonlinearity in the absence of any calibration data regarding the projector intensities or regarding the phase errors. In its first step, the standard phase-shifting algorithm is used to recover the phases, as well as the background intensities and the modulations. Using these results enables normalizing the fringe patterns, for ridding them of the effects of the background and modulations. Second, we smooth the calculated phase map by use of a low-pass filter in order to remove the ripple-like phase errors induced by the projector nonlinearity. Third, we determine a polynomial representing the projector nonlinearity by fitting the curve of the normalized fringe intensities against the cosine values of the smoothed phases. Finally, we correct the phase errors using the curve just obtained. Doing these steps in an iterative way eventually results in a phase map and, further, a 3D shape with their artifacts induced by the projector nonlinearity suppressed significantly. Experimental results demonstrate that this technique offers some advantages over others. It does not require a prior calibration of the projector, thus being suitable for dealing with a time-variant nonlinearity; its pointwise operation protects the edges and details of the measurement results from being blurred; and it works well with very few fringe patterns and is efficient in image capturing.

  2. Enthalpy of phase transition and prediction of phase Equilibria in systems of glycols and glycol ethers

    OpenAIRE

    Esina, Zoya; Miroshnikov, Aleksandr; Korchuganova, Margarita

    2014-01-01

    The PCEAS model was used to study the liquid-solid and liquid-vapor phase transitions at constant pressure in systems containing glycols and glycol ethers. This method is based on minimizing the excess Gibbs energy over the solvation parameter, which takes into account the processes of association of molecules in various phases. To compute the diagrams, the data on enthalpy and phase transition temperatures of pure components are required, while the information about the interactions in the b...

  3. Advanced conceptual design report. Phase II. Liquid effluent treatment and disposal Project W-252

    International Nuclear Information System (INIS)

    1995-01-01

    This Advanced Conceptual Design Report (ACDR) provides a documented review and analysis of the Conceptual Design Report (CDR), WHC-SD-W252-CDR-001, June 30, 1993. The ACDR provides further design evaluation of the major design approaches and uncertainties identified in the original CDR. The ACDR will provide a firmer basis for the both the design approach and the associated planning for the performance of the Definitive Design phase of the project

  4. The third phase of the OECD/NEA TDB project: TDB III

    International Nuclear Information System (INIS)

    Mompean, F.J.; Illemassene, M.; Perrone, J.

    2005-01-01

    In 2003 with a foreseen duration of four years. The main objective of this new phase is to extend the existing critically reviewed database for elements of relevance in radioactive waste management, paying attention to the needs of the various national programmes. Following the decision by the Project Management Board (integrated by representatives of 16 organisations with responsibilities in radioactive waste management in 12 OECD member countries) the elements contemplated in this new phase are Th, Sn and Fe, with a higher priority being allocated to inorganic species and compounds. In addition to the corresponding review teams for these elements, an additional expert team has been constituted to prepare guidelines for the evaluation of thermodynamic data for solid solutions. As was the case in TDB Phase II, the basic project review methodology remains unaltered in TDB III. The Figure illustrates the relationship between the various TDB bodies, with an International Organisation, the OECD NEA, acting as Project Coordinator and linking the independent scientific teams and the project governing bodies. This organizational paradigm has proven successful with the recent completion of the five Phase II Reviews (Update, Ni, Se, Zr and Organic Ligands). The review and expert team activities were started in 2004 (except for Fe, being started in 2005) following an initiation stage. This preliminary stage was designed in order to tailor the team compositions to the existing literature for each element. The first reviews stemming from TDB III are scheduled to appear in published form in 2007. The successful completion of these objectives will add three further reports to the current series of nine volumes (dealing with the chemical thermodynamics of U, Np, Pu, Am, Tc, Ni, Se, Zr and compounds and complexes of these elements with oxalate, citrate, EDTA and isa). (authors)

  5. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  6. The pioneer projects: Economical exploration of the solar system

    Science.gov (United States)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  7. Guidance for the application of an assessment methodology for innovative nuclear energy systems. INPRO manual - Proliferation resistance. Vol. 5 of the final report of phase 1 of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO)

    International Nuclear Information System (INIS)

    2008-11-01

    The International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was initiated in the year 2000, based on a resolution of the IAEA General Conference (GC(44)/RES/21). The main objectives of INPRO are (1) to help to ensure that nuclear energy is available to contribute in fulfilling energy needs in the 21st century in a sustainable manner, (2) to bring together both technology holders and technology users to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles; and (3) to create a forum to involve all relevant stakeholders that will have an impact on, draw from, and complement the activities of existing institutions, as well as ongoing initiatives at the national and international level. The INPRO manual is comprised of an overview volume (No. 1), and eight additional volumes covering the areas of economics (Volume 2), infrastructure (Volume 3), waste management (Volume 4), proliferation resistance (laid out in this report) (Volume 5), physical protection (Volume 6), environment (Volume 7), safety of nuclear reactors (Volume 8), and safety of nuclear fuel cycle facilities (Volume 9). This volume of the INPRO manual is based on the results of an INPRO study on proliferation resistance of the DUPIC fuel cycle performed by the Republic of Korea during 2005 and 2006, recommendations from IAEA consultancy meetings, and on a special service agreement with G. Pshakin (Russian Federation). The INPRO Manual starts with an introduction in Chapter 1. In Chapter 2, the necessary information is described to perform an INPRO assessment in the area of proliferation resistance. Explanatory notes on the INPRO basic principles (BP) and user requirements (UR) in the area of proliferation resistance, are reproduced in Chapter 3 to provide context for the assessor; additionally, background of each criterion (CR) and a corresponding procedure is described how to perform an INPRO assessment. The

  8. Guidance for the application of an assessment methodology for Innovative Nuclear Energy Systems. INPRO manual - Economics. Vol. 2 of the final report of phase 1 of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO)

    International Nuclear Information System (INIS)

    2008-11-01

    The International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was initiated in the year 2000, based on a resolution of the IAEA General Conference (GC(44)/RES/21). The main objectives of INPRO are (1) to help to ensure that nuclear energy is available to contribute in fulfilling energy needs in the 21st century in a sustainable manner, (2) to bring together both technology holders and technology users to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles; and (3) to create a forum to involve all relevant stakeholders that will have an impact on, draw from, and complement the activities of existing institutions, as well as ongoing initiatives at the national and international level. This publication elaborates on the guidance given in the INPRO report 'Methodology for the assessment of innovative nuclear reactors and fuel cycles', IAEA-TECDOC-1434 (2004), and the previous INPRO report 'Guidance for the evaluation for innovative nuclear reactors and fuel cycles', IAEA-TECDOC-1362 (2003) in the area of economics. The information presented in Volume 1 of the INPRO manual should be considered to be an integral part of this volume and the user should be familiar with that information. The goal of the INPRO Manual for the area of economics (Volume 2) is to provide guidance for performing an INPRO assessment, as described in Volume 1 of the INPRO manual, in the area of economics. The manual is not intended to provide guidance on how to design an INS to meet the INPRO requirements in the area of economics: rather, the focus is on the assessment method and the evaluation of the INPRO criteria in the area of economics. The INPRO assessor, i.e. the individual or group of individuals carrying out the assessment, is assumed to be knowledgeable in the area of economics and financial analysis. The INPRO assessment will either confirm that the INPRO economic criteria are fulfilled

  9. Guidance for the application of an assessment methodology for innovative nuclear energy systems. INPRO manual - Environment. Vol. 7 of the final report of phase 1 of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO)

    International Nuclear Information System (INIS)

    2008-11-01

    The International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was initiated in the year 2000, based on a resolution of the IAEA General Conference (GC(44)/RES/21). The main objectives of INPRO are (1) to help to ensure that nuclear energy is available to contribute in fulfilling energy needs in the 21st century in a sustainable manner, (2) to bring together both technology holders and technology users to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles; and (3) to create a forum to involve all relevant stakeholders that will have an impact on, draw from, and complement the activities of existing institutions, as well as ongoing initiatives at the national and international level. The INPRO manual is comprised of an overview volume (No. 1), and eight additional volumes covering the areas of economics (Volume 2), infrastructure (Volume 3), waste management (Volume 4), proliferation resistance (Volume 5), physical protection (Volume 6), environment (laid out in this volume) (Volume 7), safety of nuclear reactors (Volume 8), and safety of nuclear fuel cycle facilities (Volume 9). This volume should provide guidance to the assessor of an INS that is planned (or maintained or enlarged), describing how to apply the INPRO methodology in the area of environment. It follows the guidelines of the INPRO report 'Methodology for the assessment of innovative nuclear reactors and fuel cycles', together with its previous report 'Guidance for the evaluation for innovative nuclear reactors and fuel cycles'. The INPRO Manual starts with an introduction in Chapter 1. In Chapter 2 an overview is presented what kind of information must be available to an INPRO assessor to perform his environmental assessment. In Chapter 3 the background of the INPRO environmental basic principle BP1, the corresponding user requirements (UR) and criteria (CR) consisting of indicators (IN) and acceptance

  10. Guidance for the application of an assessment methodology for innovative nuclear energy systems. INPRO manual - Waste management. Vol. 4 of the final report of phase 1 of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO)

    International Nuclear Information System (INIS)

    2008-11-01

    The International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was initiated in the year 2000, based on a resolution of the IAEA General Conference (GC(44)/RES/21). The main objectives of INPRO are (1) to help to ensure that nuclear energy is available to contribute in fulfilling energy needs in the 21st century in a sustainable manner, (2) to bring together both technology holders and technology users to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles; and (3) to create a forum to involve all relevant stakeholders that will have an impact on, draw from, and complement the activities of existing institutions, as well as ongoing initiatives at the national and international level. The INPRO manual is comprised of an overview volume (No. 1), and eight additional volumes covering the areas of economics (Volume 2), infrastructure (Volume 3), waste management (Volume 4), proliferation resistance (laid out in this report) (Volume 5), physical protection (Volume 6), environment (Volume 7), safety of nuclear reactors (Volume 8), and safety of nuclear fuel cycle facilities (Volume 9). This volume of the INPRO manual is based on the results of an INPRO study on proliferation resistance of the DUPIC fuel cycle performed by the Republic of Korea during 2005 and 2006, recommendations from IAEA consultancy meetings, and on a special service agreement with G. Pshakin (Russian Federation). The INPRO Manual starts with an introduction in Chapter 1. In Chapter 2, the necessary information is described to perform an INPRO assessment in the area of proliferation resistance. Explanatory notes on the INPRO basic principles (BP) and user requirements (UR) in the area of proliferation resistance, are reproduced in Chapter 3 to provide context for the assessor; additionally, background of each criterion (CR) and a corresponding procedure is described how to perform an INPRO assessment. The

  11. Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

  12. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    Science.gov (United States)

    Lawrence N. Hudson; Joseph Wunderle M.; And Others

    2016-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to...

  13. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    NARCIS (Netherlands)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of

  14. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    DEFF Research Database (Denmark)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity ...

  15. Projective synchronization of chaotic systems with bidirectional ...

    Indian Academy of Sciences (India)

    2Department of Applied Mathematics, University of Calcutta, 92, A.P.C. Road,. Kolkata 700 009, India. ∗ ... versal phenomenon in a variety of natural and engineering systems [4]. Over the past two decades ..... Now, following the rule for the construction of master–slave system, we obtain the master system as. ˙x1 = x2 + ...

  16. FALSIRE Phase II. CSNI project for Fracture Analyses of Large-Scale International Reference Experiments (Phase II). Comparison report

    International Nuclear Information System (INIS)

    Sievers, J.; Schulz, H.; Bass, R.; Pugh, C.; Keeney, J.

    1996-11-01

    A summary of Phase II of the Project for Fracture Analysis of Large-Scale International Reference Experiments (FALSIRE) is presented. A FALSIRE II Workshop focused on analyses of reference fracture experiments. More than 30 participants representing 22 organizations from 12 countries took part in the workshop. Final results for 45 analyses of the reference experiments were received from the participating analysts. For each experiment, analysis results provided estimates of variables that include temperature, crack-mouth-opening displacement, stress, strain, and applied K and J values. The data were sent electronically to the Organizing Committee, who assembled the results into a comparative data base using a special-purpose computer program. A comparative assessment and discussion of the analysis results are presented in the report. Generally, structural responses of the test specimens were predicted with tolerable scatter bands. (orig./DG)

  17. 360-degrees profilometry using strip-light projection coupled to Fourier phase-demodulation.

    Science.gov (United States)

    Servin, Manuel; Padilla, Moises; Garnica, Guillermo

    2016-01-11

    360 degrees (360°) digitalization of three dimensional (3D) solids using a projected light-strip is a well-established technique in academic and commercial profilometers. These profilometers project a light-strip over the digitizing solid while the solid is rotated a full revolution or 360-degrees. Then, a computer program typically extracts the centroid of this light-strip, and by triangulation one obtains the shape of the solid. Here instead of using intensity-based light-strip centroid estimation, we propose to use Fourier phase-demodulation for 360° solid digitalization. The advantage of Fourier demodulation over strip-centroid estimation is that the accuracy of phase-demodulation linearly-increases with the fringe density, while in strip-light the centroid-estimation errors are independent. Here we proposed first to construct a carrier-frequency fringe-pattern by closely adding the individual light-strip images recorded while the solid is being rotated. Next, this high-density fringe-pattern is phase-demodulated using the standard Fourier technique. To test the feasibility of this Fourier demodulation approach, we have digitized two solids with increasing topographic complexity: a Rubik's cube and a plastic model of a human-skull. According to our results, phase demodulation based on the Fourier technique is less noisy than triangulation based on centroid light-strip estimation. Moreover, Fourier demodulation also provides the amplitude of the analytic signal which is a valuable information for the visualization of surface details.

  18. Draft Air Pathway Report: Phase 1 of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1990-07-20

    This report summarizes the air pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project, conducted by Battelle staff at the Pacific Northwest Laboratory under the direction of an independent Technical Steering Panel. The HEDR Project is estimating historical radiation doses that could have been received by populations near the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the air-pathway dose reconstruction sought to determine whether dose estimates could be calculated for populations in the 10 counties nearest the Hanford Site from atmospheric releases of iodine-131 from the site from 1944--1947. Phase 1 demonstrated the following: HEDR-calculated source-term estimates of iodine-131 releases to the atmosphere were within 20% of previously published estimates; calculated vegetation concentrations of iodine-131 agree well with previously published measurements; the highest of the Phase 1 preliminary dose estimates to the thyroid are consistent with independent, previously published estimates of doses to maximally exposed individuals; and relatively crude, previously published measurements of thyroid burdens for Hanford workers are in the range of average burdens that the HEDR model estimated for similar reference individuals'' for the period 1944--1947. 4 refs., 10 figs., 9 tabs.

  19. The SKI-project External events - Phase 2. Estimation of fire frequencies per plant and per building

    International Nuclear Information System (INIS)

    Poern, K.

    1996-08-01

    The Swedish-Finnish handbook for initiating event frequencies, I-Book, does not contain any fire frequencies. This matter of fact is not defensible considering the substantial risk contribution caused by fires. In the PSAs performed hitherto the initiating fire frequencies have been determined from case to case. Because data are usually very scarce in these areas it is very important to develop unique definitions, to systematically utilize both international and national experiences and to establish an appropriate statistical estimation method. It is also important to present the accumulated experience such that it can be used for different purposes, not only within PSA but also in the concrete fire preventive work. During phase 1 of the project External Events an inventory was made of existing methods for probabilistic fire analysis in general. During phase 2 of the project it was decided to initialize the work on a complementary handbook, called X-Book, in order to encompass the frequencies of system external events, i.e. initiating events that are caused by events occurring outside the system boundaries. In Version 1 of the X-Book the attention is mainly focussed on the estimation of initiating fire frequencies, per plant and per building. This estimation is basically founded on reports that the power companies have collected for this specific purpose. This report describes the statistical model and method that have been used in the estimation process. The methodological results achieved may, possibly after some modification, be applicable also to other types of system external events

  20. Optimum gain and phase for stochastic cooling systems

    International Nuclear Information System (INIS)

    Meer, S. van der.

    1984-01-01

    A detailed analysis of optimum gain and phase adjustment in stochastic cooling systems reveals that the result is strongly influenced by the beam feedback effect and that for optimum performance the system phase should change appreciably across each Schottky band. It is shown that the performance is not greatly diminished if a constant phase is adopted instead. On the other hand, the effect of mixing between pick-up and kicker (which produces a phase change similar to the optimum one) is shown to be less perturbing than is usually assumed, provided that the absolute value of the gain is not too far from the optimum value. (orig.)

  1. Youth's social network structures and peer influences: study protocol MyMovez project - Phase I.

    Science.gov (United States)

    Bevelander, Kirsten E; Smit, Crystal R; van Woudenberg, Thabo J; Buijs, Laura; Burk, William J; Buijzen, Moniek

    2018-04-16

    Youth are an important target group for social network interventions, because they are particularly susceptible to the adaptation of healthy and unhealthy habits and behaviors of others. They are surrounded by 'social influence agents' (i.e., role models such as family, friends and peers) that co-determine their dietary intake and physical activity. However, there is a lack of systematic and comprehensive research on the implementation of a social network approach in health campaigns. The MyMovez research project aims to fill this gap by developing a method for effective social network campaign implementation. This protocol paper describes the design and methods of Phase I of the MyMovez project, aiming to unravel youth's social network structures in combination with individual, psychosocial, and environmental factors related to energy intake and expenditure. In addition, the Wearable Lab is developed to enable an attractive and state-of-the-art way of collecting data and online campaign implementation via social networks. Phase I of the MyMovez project consists of a large-scale cross-sequential cohort study (N = 953; 8-12 and 12-15 y/o). In five waves during a 3-year period (2016-2018), data are collected about youth's social network exposure, media consumption, socialization experiences, psychological determinants of behavior, physical environment, dietary intake (snacking and drinking behavior) and physical activity using the Wearable Lab. The Wearable Lab exists of a smartphone-based research application (app) connected to an activity tracking bracelet, that is developed throughout the duration of the project. It generates peer- and self-reported (e.g., sociometric data and surveys) and experience sampling data, social network beacon data, real-time physical activity data (i.e., steps and cycling), location information, photos and chat conversation data from the app's social media platform Social Buzz. The MyMovez project - Phase I is an innovative cross

  2. State partnership in environmental health and safety phase of Plowshare projects

    Energy Technology Data Exchange (ETDEWEB)

    Kinsman, S [California State Department of Public Health, Berkeley, CA (United States)

    1969-07-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  3. Sakhalin 2, phase 2 project : meeting the Arctic challenge in a sub-Arctic environment

    International Nuclear Information System (INIS)

    Reece, A.; Gerges, A.; Efthymiou, M.; Winkler, M.

    2008-01-01

    Sakhalin Energy's objective is to commercially develop, operate and market the hydrocarbon resources and associated infrastructure governed by the Sakhalin 2 licenses for the sustainable benefit of shareholders, the Russian Federation, the Sakhalin Oblast and the wider community. This presentation discussed Sakhalin Energy's holdings including its investment company and hydrocarbon projects in eastern Russia. The Sakhalin area is a remote island that lacks infrastructure, has a low population density, with a rich onshore and offshore wildlife. It is a seismically active area, with seasonal operating windows, drifting pack ice from December to June, waves up to 18 metre maximum height, and frequent fog in spring and summer. The temperature also varies from 28 degrees Celsius to -40 degrees Celsius. The presentation also addressed the rerouting of offshore pipelines to ensure the least possible disturbance to western gray whale migration. Several photographs and illustrations of the phase 1 project were presented. Open water conditions were also illustrated. The phase 2 project was then outlined. This included illustrations of the platform, plant and export terminal, and onshore processing facility. Other photographs that were shown in the presentation included the offshore pipeline installation; a view of the shore approach to the pipeline installation; oil spill response; and escape, evacuation, and response. The design challenges and design philosophy of the project were also identified. The presentation concluded with a discussion of ice loading and platform response. figs

  4. Sakhalin 2, phase 2 project : meeting the Arctic challenge in a sub-Arctic environment

    Energy Technology Data Exchange (ETDEWEB)

    Reece, A.; Gerges, A.; Efthymiou, M.; Winkler, M. [Sakhalin Energy, Moscow (Russian Federation)

    2008-09-15

    Sakhalin Energy's objective is to commercially develop, operate and market the hydrocarbon resources and associated infrastructure governed by the Sakhalin 2 licenses for the sustainable benefit of shareholders, the Russian Federation, the Sakhalin Oblast and the wider community. This presentation discussed Sakhalin Energy's holdings including its investment company and hydrocarbon projects in eastern Russia. The Sakhalin area is a remote island that lacks infrastructure, has a low population density, with a rich onshore and offshore wildlife. It is a seismically active area, with seasonal operating windows, drifting pack ice from December to June, waves up to 18 metre maximum height, and frequent fog in spring and summer. The temperature also varies from 28 degrees Celsius to -40 degrees Celsius. The presentation also addressed the rerouting of offshore pipelines to ensure the least possible disturbance to western gray whale migration. Several photographs and illustrations of the phase 1 project were presented. Open water conditions were also illustrated. The phase 2 project was then outlined. This included illustrations of the platform, plant and export terminal, and onshore processing facility. Other photographs that were shown in the presentation included the offshore pipeline installation; a view of the shore approach to the pipeline installation; oil spill response; and escape, evacuation, and response. The design challenges and design philosophy of the project were also identified. The presentation concluded with a discussion of ice loading and platform response. figs.

  5. State partnership in environmental health and safety phase of Plowshare projects

    International Nuclear Information System (INIS)

    Kinsman, S.

    1969-01-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  6. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  7. Guidance for the application of an assessment methodology for innovative nuclear energy systems. INPRO manual - Infrastructure. Vol. 3 of the final report of phase 1 of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO)

    International Nuclear Information System (INIS)

    2008-11-01

    The International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was initiated in the year 2000, based on a resolution of the IAEA General Conference (GC(44)/RES/21). The main objectives of INPRO are (1) to help to ensure that nuclear energy is available to contribute in fulfilling energy needs in the 21st century in a sustainable manner, (2) to bring together both technology holders and technology users to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles; and (3) to create a forum to involve all relevant stakeholders that will have an impact on, draw from, and complement the activities of existing institutions, as well as ongoing initiatives at the national and international level. The INPRO manual is comprised of an overview volume and eight additional volumes covering the areas of economics (Volume 2), infrastructure (Volume 3, outlined here), waste management (Volume 4), proliferation resistance (Volume 5), physical protection (Volume 6), environment (Volume 7), safety of reactors (Volume 8), and safety of nuclear fuel cycle facilities (Volume 9). Within INPRO, the term infrastructure can be defined as the collection of capabilities of institutions involved in a nuclear power program in a given country that are necessary for the successful deployment (or enlargement) and operation of an INS, including legal and institutional, industrial and economic, and socio-political features. Within INPRO, the definition of an INS includes activities and facilities (i.e. components) at both the front end of the fuel cycle (e.g., mining, enrichment, fuel fabrication) and the back end (e.g., reprocessing, storage, and repository) (Section 4.2.1 of Volume 1 of the INPRO manual. Consequently, within INPRO, such facilities are not considered to be a part of the INPRO area of infrastructure, albeit that they influence the size of the necessary infrastructure required in a given

  8. Reconfigurable/Reprogrammable Communications Systems, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's latest effort in developing a common platform for space communication and navigation systems is the Space Telecommunications Radio System (STRS) standard. It...

  9. Space Radiation Intelligence System (SPRINTS), Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — NextGen Federal Systems proposes an innovative SPace Radiation INTelligence System (SPRINTS) which provides an interactive and web-delivered capability that...

  10. X-ray phase analysis in leucite systems

    Czech Academy of Sciences Publication Activity Database

    Maixner, J.; Kloužková, A.; Mrázová, M.; Kohoutková, Martina

    2007-01-01

    Roč. 26, č. 2 (2007), s. 531-536 ISSN 0044-2968 R&D Projects: GA MPO 2A-1TP1/063 Institutional research plan: CEZ:AV0Z40320502 Keywords : cubic leucite * phase transformation * X-ray powder diffraction Subject RIV: CA - Inorganic Chemistry Impact factor: 1.338, year: 2007

  11. An algorithm for reliability analysis of phased-mission systems

    International Nuclear Information System (INIS)

    Ma, Y.; Trivedi, K.S.

    1999-01-01

    The purpose of this paper is to describe an efficient Boolean algebraic algorithm that provides exact solution to the unreliability of a multi-phase mission system where the configurations are described through fault trees. The algorithm extends and improves the Boolean method originally proposed by Somani and Trivedi. By using the Boolean algebraic method, we provide an efficient modeling approach which avoids the state space explosion and the mapping problems that are encountered by the Markov chain approach. To calculate the exact solution of the phased-mission system with deterministic phase durations, we introduce the sum of disjoint phase products (SDPP) formula, which is a phased-extension of the sum of disjoint products (SDP) formula. Computationally, the algorithm is quite efficient because it calls an SDP generation algorithm in the early stage of the SDPP computation. In this way, the phase products generated in the early stage of the SDPP formula are guaranteed to be disjoint. Consequently, the number of the intermediate phase products is greatly reduced. In this paper, we also consider the transient analysis of the phased-mission system. Special care is needed to account for the possible latent failures at the mission phase change times. If there are more stringent success criteria just after a mission phase change time, an unreliability jump would occur at that time. Finally, the algorithm has been implemented in the software package SHARPE. With SHARPE, the complexities of the phased-mission system is made transparent to the potential users. The user can conveniently specify a phased-mission model at a high level (through fault trees) and analyze the system quantitatively

  12. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  13. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  14. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  15. Imaging phase holdup distribution of three phase flow systems using dual source gamma ray tomography

    International Nuclear Information System (INIS)

    Varma, Rajneesh; Al-Dahhan, Muthanna; O'Sullivan, Joseph

    2008-01-01

    Full text: Multiphase reaction and process systems are used in abundance in the chemical and biochemical industry. Tomography has been successfully employed to visualize the hydrodynamics of multiphase systems. Most of the tomography methods (gamma ray, x-ray and electrical capacitance and resistance) have been successfully implemented for two phase dynamic systems. However, a significant number of chemical and biochemical systems consists of dynamic three phases. Research effort directed towards the development of tomography techniques to image such dynamic system has met with partial successes for specific systems with applicability to limited operating conditions. A dual source tomography scanner has been developed that uses the 661 keV and 1332 keV photo peaks from the 137 Cs and 60 Co for imaging three phase systems. A new approach has been developed and applied that uses the polyenergetic Alternating Minimization (A-M) algorithm, developed by O'Sullivan and Benac (2007), for imaging the holdup distribution in three phases' dynamic systems. The new approach avoids the traditional post image processing approach used to determine the holdup distribution where the attenuation images of the mixed flow obtained from gamma ray photons of two different energies are used to determine the holdup of three phases. In this approach the holdup images are directly reconstructed from the gamma ray transmission data. The dual source gamma ray tomography scanner and the algorithm were validated using a three phase phantom. Based in the validation, three phase holdup studies we carried out in slurry bubble column containing gas liquid and solid phases in a dynamic state using the dual energy gamma ray tomography. The key results of the holdup distribution studies in the slurry bubble column along with the validation of the dual source gamma ray tomography system would be presented and discussed

  16. Using the phase-space imager to analyze partially coherent imaging systems: bright-field, phase contrast, differential interference contrast, differential phase contrast, and spiral phase contrast

    Science.gov (United States)

    Mehta, Shalin B.; Sheppard, Colin J. R.

    2010-05-01

    Various methods that use large illumination aperture (i.e. partially coherent illumination) have been developed for making transparent (i.e. phase) specimens visible. These methods were developed to provide qualitative contrast rather than quantitative measurement-coherent illumination has been relied upon for quantitative phase analysis. Partially coherent illumination has some important advantages over coherent illumination and can be used for measurement of the specimen's phase distribution. However, quantitative analysis and image computation in partially coherent systems have not been explored fully due to the lack of a general, physically insightful and computationally efficient model of image formation. We have developed a phase-space model that satisfies these requirements. In this paper, we employ this model (called the phase-space imager) to elucidate five different partially coherent systems mentioned in the title. We compute images of an optical fiber under these systems and verify some of them with experimental images. These results and simulated images of a general phase profile are used to compare the contrast and the resolution of the imaging systems. We show that, for quantitative phase imaging of a thin specimen with matched illumination, differential phase contrast offers linear transfer of specimen information to the image. We also show that the edge enhancement properties of spiral phase contrast are compromised significantly as the coherence of illumination is reduced. The results demonstrate that the phase-space imager model provides a useful framework for analysis, calibration, and design of partially coherent imaging methods.

  17. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  18. Dynamics of Shape Memory Alloy Systems, Phase 2

    Science.gov (United States)

    2015-12-22

    Nonlinear Dynamics and Chaos in Systems with Discontinuous Support Using a Switch Model”, DINAME 2005 - XI International Conference on Dynamic Problems in...AFRL-AFOSR-CL-TR-2016-0003 Dynamics of Shape Memory Alloy Systems , Phase 2 Marcelo Savi FUNDACAO COORDENACAO DE PROJETOS PESQUISAS E EEUDOS TECNOL...release. 2 AFOSR FINAL REPORT Grant Title: Nonlinear Dynamics of Shape Memory Alloy Systems , Phase 2 Grant #: FA9550-11-1-0284 Reporting Period

  19. Quantum trajectory approach to the geometric phase: open bipartite systems

    International Nuclear Information System (INIS)

    Yi, X X; Liu, D P; Wang, W

    2005-01-01

    Through the quantum trajectory approach, we calculate the geometric phase acquired by a bipartite system subjected to decoherence. The subsystems that compose the bipartite system interact with each other and then are entangled in the evolution. The geometric phase due to the quantum jump for both the bipartite system and its subsystems is calculated and analysed. As an example, we present two coupled spin-1/2 particles to detail the calculations

  20. AC system stabilization via phase shift transformer with thyristor commutation

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Jose Carlos de; Guimaraes, Geraldo Caixeta; Moraes, Adelio Jose [Uberlandia Univ., MG (Brazil); Abreu, Jose Policarpo G. de [Escola Federal de Engenharia de Itajuba, MG (Brazil); Oliveira, Edimar Jose de [Juiz de Fora Univ., MG (Brazil)

    1994-12-31

    This article aims to present initially the constructive and operative forms of a phase-shift autotransformer which provides both magnitude and phase angle change through thyristor commutation, including a technic to reduce the number of thyristors. Following, it is proposed a control system to make such equipment an efficient AC system stabilizing tool. It is presented some simulation results to show the operation of this transformer in an electrical system. (author) 3 refs., 11 figs., 3 tabs.