    The Translation, Confinement, and Sustainment Upgrade (TCSU) experiment employs a bakeable ultra-high vacuum chamber to reduce impurities and overall recycling. In recent experiments with Ti gettering applied to the plasma tube, radiation from impurities was dramatically reduced and recycling was almost eliminated. Ion temperature and azimuthal rotation velocities data from the resulting lower density, higher temperature FRC will be presented. The data comes from Doppler-broadening and Doppler-shifted measurements of Si III, C III, and O III, the dominant impurities in the TCSU plasma. Additionally, plans and initial data will be presented on azimuthal and poloidal velocity shear. Velocity shear is thought to improve stability and transport. All data measurements are made using an Acton Research SpectraPro 500i Czerny-Turney type spectrograph.

  2. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  3. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  4. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  5. The Ural Electrochemical Integrated Plant Sustainability Program of Nuclear Material Protection, Control and Accounting System Upgrades

    International Nuclear Information System (INIS)

    Vakhonin, Alexander; Yuldashev, Rashid; Dabbs, Richard D.; Carroll, Michael F.; Garrett, Albert G.; Patrick, Scott W.; Ku, Eshter M.

    2009-01-01

    UEIP has been working on a comprehensive sustainability program that includes establishing a site sustainability working group, information gathering, planning, organizing, developing schedule and estimated costs, trhough joint UEIP-US DOE/NNSA National Laboratory sustainability contracts. Considerable efforts have been necessary in the sustainability planning, monitoring, and control of the scope of work using tools such as Microsoft Excel, Microsoft Project and SAP R/3. While information interchanges within the sustainability program provides adequate US assurances that US funds are well spent through its quarterly reporting methodology, proper information security and protection measures are taken throughout the process. Decommissioning of outdated equipment has also become part of determining sustainability requirements and processes. The site's sustainability program has facilitated the development of a transition plan toward eventual full Russian funding of sustaining nuclear security upgrades.

  6. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  7. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  8. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  9. The Sustainability of Global Chain Governance: Network Structures and Local Supplier Upgrading in Thailand

    Directory of Open Access Journals (Sweden)

    Sungchul Cho

    2016-09-01

    Full Text Available Although it has been widely accepted that insertion into global production networks may play a critical role in fostering local supplier upgrading, scholars have yet to fully incorporate heterogeneous configurations of buyer-supplier relationships within networks into empirical testing. Using a representative sample of manufacturing firms in Thailand, we propose a more nuanced empirical framework that asks which features of buyer-supplier relationships are related to which aspects of local supplier upgrading. Our findings, derived from latent class analysis, show that the ways value chains are governed can exert varying effects on different types of technological upgrading. Being a multinational corporation (MNC supplier was found to have positive effects on process and minor product upgrading, irrespective of the types of buyer-supplier networks. However, we found a more radical type of upgrading (i.e., the development of own brands to be negatively related to insertion into ‘quasi-hierarchical’ or ‘buyer-driven relationships’, whilst involvement in ‘cooperative networks’ was associated with a significantly higher tendency of product and brand upgrading. Understanding this inherent relationality provides a crucial balance to previous firm-level findings, suggesting that the sustainability of participation in global value chains depends on the relational structures in which local manufacturers are embedded.

  10. Sustainable and Practical Firmware Upgrade for Wireless Access Point Using Password-Based Authentication

    Directory of Open Access Journals (Sweden)

    Jaejin Jang

    2016-08-01

    Full Text Available Wireless access points (WAPs are devices that provide Internet connectivity to devices such as desktops, laptops, smartphones, and tablets. Hence, it is important to provide sufficient availability to devices and security for the traffic that is routed by a WAP. However, attackers can decrease the network bandwidth or obtain the traffic including private data such as search histories, login information, and device usage patterns by exploiting the vulnerabilities in firmware upgrades to install malicious firmware. To address this problem, we propose a sustainable and practical firmware upgrade for a WAP using password-based authentication. The proposed upgrade protocol ensures security by adding freshness to the firmware whenever a firmware upgrade occurs. This freshness is different for each event and each firmware; therefore, even if the freshness of one firmware is exposed, the others are secure. In addition, confidentiality, integrity, and authentication are ensured. Furthermore, the proposed protocol can be easily implemented and adapted to WAPs. Experiments are performed to evaluate the upgrade time, resource usage, and code size in wired and wireless connected environments by implementing a prototype and analyzing the security of the protocol. The results show that the proposed upgrade is secure and practical.

  11. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  12. Upgrading of lignocellulosic biorefinery to value-added chemicals: Sustainability and economics of bioethanol-derivatives

    DEFF Research Database (Denmark)

    Cheali, Peam; Posada, John A.; Gernaey, Krist

    2015-01-01

    with a sustainability assessment method is used as evaluation tool. First, an existing superstructure representing the lignocellulosic biorefinery design network is extended to include the options for catalytic conversion of bioethanol to value-added derivatives. Second, the optimization problem for process upgrade...... of operating profit for biorefineries producing bioethanol-derived chemicals (247 MM$/a and 241 MM$/a for diethyl ether and 1,3-butadiene, respectively). Second, the optimal designs for upgrading bioethanol (i.e. production of 1,3-butadiene and diethyl ether) performed also better with respect...... to sustainability compared with the petroleum-based processes. In both cases, the effects of the market price uncertainties were also analyzed by performing quantitative economic risk analysis and presented a significant risk of investment for a lignocellulosic biorefinery (12 MM$/a and 92 MM$/a for diethyl ether...

  13. Integrating sustainable biofuel and silver nanomaterial production for in situ upgrading of cellulosic biomass pyrolysis

    International Nuclear Information System (INIS)

    Xue, Junjie; Dou, Guolan; Ziade, Elbara; Goldfarb, Jillian L.

    2017-01-01

    Graphical abstract: Integrated production of biotemplated nanomaterials and upgraded biofuels (solid lines indicate current processes, dashed lines indicated proposed pathway). - Highlights: • Novel integrated process to co-produce nanomaterials and biofuels via pyrolysis. • Impregnation of biomass with silver nitrate upgrades bio-oil during pyrolysis. • Co-synthesis enhances syngas produced with more hydrogen. • Biomass template impacts bio-fuels and morphology of resulting nanomaterials. - Abstract: Replacing fossil fuels with biomass-based alternatives is a potential carbon neutral, renewable and sustainable option for meeting the world’s growing energy demand. However, pyrolytic conversions of biomass-to-biofuels suffer marginal total energy gain, and technical limitations such as bio-oils’ high viscosity and oxygen contents that result in unstable, corrosive and low-value fuels. This work demonstrates a new integrated biorefinery process for the co-production of biofuels and silver nanomaterials. By impregnating pure cellulose and corn stalk with silver nitrate, followed by pyrolysis, the gas yield (especially hydrogen) increases substantially. The condensable bio-oil components of the impregnated samples are considerably higher in furfurals (including 5-hydroxymethylfurfural). Though the overall activation energy barrier, as determined via the Distributed Activation Energy Model, does not change significantly with the silver nitrate pre-treatment, the increase in gases devolatilized, and improved 5-hydroxymethylfurfural yield, suggest a catalytic effect, potentially increasing decarboxylation reactions. After using this metal impregnation to improve pyrolysis fuel yield, following pyrolysis, the silver-char composite materials are calcined to remove the biomass template to yield silver nanomaterials. While others have demonstrated the ability to biotemplate such nanosilver on cellulosic biomass, they consider only impregnation and oxidation of the

  14. Sustainable Governance for the Opened Electric Vehicle Charging and Upgraded Facilities Market

    Directory of Open Access Journals (Sweden)

    Tian Wu

    2017-11-01

    Full Text Available Since the China State Grid opened the market for infrastructure construction of electric charging stations and allowed Tesla, Potevio, BAIC BJEV and other enterprises to provide their own charging stations and other infrastructure construction, the development of electric vehicles has been greatly affected. How to maintain a sustainable governance in the opened electric vehicle charging and upgraded facilities market is an important policy issues. This paper presents a monopolistic competition model for the differentiated products market and addresses several issues related to Cournot equilibrium to illustrate why the expected free market actually operates in a monopolistic competition market structure. The analytic solution of the model shows that whether the extent of firm entry is insufficient, excessive or optimum is determined by consumers’ time preference, level of production differentiation and features of cost structure, including fixed cost and marginal cost. The sensitivity analysis has been performed among the above factors and tracked some other factors which would determine the effect of the new policy issues. The main policy suggestion is that the government should optimize entry regulations and lay down the criterion of charging interface standards for charging stations to avoid the electric vehicle charging and upgraded facilities marketization process of a one-size-fits-all solution and form a monopolistic competition market.

  15. A sustainable approach to empower the bio-based future: upgrading of biomass via process intensification

    Data.gov (United States)

    U.S. Environmental Protection Agency — An economically viable and environmentally benign continuous flow intensified process has been developed that demonstrates its ability to upgrade biomass into...

  16. How Sustainable are Benefits from Global Production Networks? Malaysia's Upgrading Prospects in the Electronics Industry

    OpenAIRE

    Dieter Ernst

    2003-01-01

    The paper introduces an operational definition of industrial upgrading (IU and documents the emergence of complex, multi-tier "networks of networks" which provide new opportunities for IU, but which also raise threshold requirements for participating in these networks. I highlight structural weaknesses of the Malaysian electronics industry that constrain its upgrading prospects; assess current policies that try to link cluster development and global network integration; discuss adjustments in...

  17. Making Retail Supply Chains Sustainable: Upgrading Opportunities for Developing Country Suppliers under Voluntary Quality Standards

    NARCIS (Netherlands)

    J.C.A.C. van Wijk (Jeroen); M. Danse (Myrtille); R.J.M. van Tulder (Rob)

    2008-01-01

    textabstractThis paper examines the sustainability claims of private quality standards, voluntary adopted by supermarket to improve the quality of products in respect of food safety, and environmental and social sustainability. The concept of ‘sustainability’ is defined as the opportunity for

  18. Developing indigenous safeguards capabilities within the MPC ampersand A program: A transition from near-term upgrades to long-term sustainability

    International Nuclear Information System (INIS)

    Robinson, P.W.; Leutters, F.O.; Horton, R.D.; Soo Hoo, M.S.

    1997-01-01

    Approximately five years ago, the United States and countries of ampersand Former Soviet Union (FSU) started the Cooperative Threat Reduction program. The program's purpose was to accelerate reduction of the risk of nuclear proliferation, including such threats as theft, diversion, and unauthorized possession of nuclear materials. This goal would be accomplished through near-term upgrades to strengthen the nuclear material protection, control, and accounting systems within the FSU countries. In addition to this near-term goal, a long-term goal of the U.S. Department of Energy's (DOE) Material Protection, Control, and Accounting (MPC ampersand A) program is to promote a new safeguards culture and to support the establishment of a sustaining MPC ampersand A infrastructure in the FSU. This long-term goal is vital to assuring that the near-term upgrades remain effective for safeguarding nuclear material as these countries experience political and social changes. The MPC ampersand A program is managed by DOE's Russia/Newly Independent States (NIS) Nuclear Materials Security Task Force. A coordinated effort is underway to promote and to help establish a new safeguards culture and a sustaining infrastructure. Elements being implemented at both the national and site levels include system operational performance evaluations, development of MPC ampersand A training, operational procedures, national MPC ampersand A regulations, and adaptation of modern MPC ampersand A methodologies to suit the conditions in the FSU countries. This paper identifies current efforts in several countries that are undergoing transition from near-term upgrades to sustainable MPC ampersand A systems

  19. Sustainability.

    Science.gov (United States)

    Chang, Chein-Chi; DiGiovanni, Kimberly; Mei, Ying; Wei, Li

    2016-10-01

    This review on Sustainability covers selected 2015 publications on the focus of Sustainability. It is divided into the following sections : • Sustainable water and wastewater utilities • Sustainable water resources management • Stormwater and green infrastructure • Sustainability in wastewater treatment • Life cycle assessment (LCA) applications • Sustainability and energy in wastewater industry, • Sustainability and asset management.

  20. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  1. PSI: Upgrading

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade

  2. PSI: Upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-09-15

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade.

  3. Coal upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, S. [IEA Clean Coal Centre, London (United Kingdom)

    2009-10-15

    This report examines current technologies and those likely to be used to produce cleaner coal and coal products, principally for use in power generation and metallurgical applications. Consideration is also given to coal production in the leading coal producing countries, both with developed and developing industries. A range of technologies are considered. These include the coal-based liquid fuel called coal water mixture (CWM) that may compete with diesel, the production of ultra-clean coal (UCC) and coal liquefaction which competes with oil and its products. Technologies for upgrading coal are considered, especially for low rank coals (LRC), since these have the potential to fill the gap generated by the increasing demand for coal that cannot be met by higher quality coals. Potential advantages and downsides of coal upgrading are outlined. Taking into account the environmental benefits of reduced pollution achieved through cleaner coal and reduced transport costs, as well as other positive aspects such as a predictable product leading to better boiler design, the advantages appear to be significant. The drying of low rank coals improves the energy productively released during combustion and may also be used as an adjunct or as part of other coal processing procedures. Coal washing technologies vary in different countries and the implications of this are outlined. Dry separation technologies, such as dry jigging and electrostatic separation, are also described. The demonstration of new technologies is key to their further development and demonstrations of various clean coal technologies are considered. A number of approaches to briquetting and pelletising are available and their use varies from country to country. Finally, developments in upgrading low rank coals are described in the leading coal producing countries. This is an area that is developing rapidly and in which there are significant corporate and state players. 81 refs., 32 figs., 3 tabs.

  4. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  5. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  6. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    for upgrading an uncompetitive product, and combine the solutions into a single solution. We also propose a spatial join-based solution that assumes P and T are indexed by an R-tree. Given a set of products in the same R-tree node, we derive three lower bounds on their upgrading costs. These bounds are employed...

  7. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  8. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  9. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  10. To upgrade or not to upgrade

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn; Rose, Jørgen

    2017-01-01

    This paper identifies the key indicators that owners need to take into account in order to choose the most affordable extent of upgrading of a typical post-1945 building. The exterior look of the building is not to be changed. Indicators include measures, risk assessment related to the changes in...

  11. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  12. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  13. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  14. LEP is upgraded

    CERN Multimedia

    1995-01-01

    A superconducting radio-frequency cavity is installed on the Large Electron-Positron (LEP) collider. This upgrade, known as LEP-2, allowed the accelerator to reach new, higher energies and so investigate new areas of physics.

  15. Analysis Efforts Supporting NSTX Upgrades

    International Nuclear Information System (INIS)

    Zhang, H.; Titus, P.; Rogoff, P.; Zolfaghari, A.; Mangra, D.; Smith, M.

    2010-01-01

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  16. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  17. ATLAS Upgrade Programme

    CERN Document Server

    Hillier, S J; The ATLAS collaboration

    2012-01-01

    With the already outstanding LHC luminosity performance, and planned LHC upgrades in the upcoming shutdowns, it is expected that within a short time-scale, the general purpose LHC experiments will have to cope with luminosities beyond their original design. In order to maintain detector performance and sensitivity to expected and new physics processes, ATLAS has defined a continuous upgrade programme which foresees staged enhancements during the next 10 years of operation, and then more widespread changes before the transition to the highest luminosities after 2022. This talk will describe several components of the ATLAS upgrade, focusing in particular on the Inner Detector and Trigger. The Inner Detector faces two challenges in the higher luminosity environment: high particle multiplicities and increased radiation dose. These will be addressed in the short term by a new layer of Pixel detectors, and in the long term by a complete replacement. The Trigger faces an increasingly difficult task of distinguishing...

  18. Upgradation of Apsara reactor

    International Nuclear Information System (INIS)

    Mammen, S.; Mukherjee, P.; Bhatnagar, A.; Sasidharan, K.; Raina, V.K.

    2009-01-01

    Apsara is a 1 MW swimming pool type research reactor using high enriched uranium as fuel with light water as coolant and moderator. The reactor is in operation for more than five decades and has been extensively used for basic research, radioisotope production, neutron radiography, detector testing, shielding experiments etc. In view of its long service period, it is planned to carry out refurbishment of the reactor to extend its useful life. During refurbishment, it is also planned to upgrade the reactor to a 2 MW reactor to improve its utilization and to upgrade the structure, system and components in line with the current safety standards. This paper gives a brief account of the design features and safety aspects of the upgraded Apsara reactor. (author)

  19. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  20. AGS intensity upgrades

    International Nuclear Information System (INIS)

    Roser, T.

    1995-01-01

    After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10 13 protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four

  1. OMEGA upgrade staging options

    International Nuclear Information System (INIS)

    Kelly, J.H.; Shoup, M.J.; Smith, D.L.

    1989-01-01

    The authors discuss how they are designing an upgrade to its 24-beam OMEGA laser system, OMEGA is a frequency tripled, all-rod system capable of producing 2 kJ at 0.8 ns on target. Important direct-drive-target-ignition physics could be investigated with an upgraded system capable of producing a shaped pulse consisting of a long (5ns) low-intensity, foot, smoothly transitioning into a short (0.5 ns), intense, compression pulse. The total pulse energy is 30 kJ, which, from target-irradiation uniformity considerations, must be distributed over 60 beams

  2. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  3. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  4. Treat upgrade fuel fabrication

    International Nuclear Information System (INIS)

    Davidson, K.V.; Schell, D.H.

    1979-01-01

    An extrusion and thermal treatment process was developed to produce graphite fuel rods containing a dispersion of enriched UO 2 . These rods will be used in an upgraded version of the Transient Reactor Test Facility (TREAT). The improved fuel provides a higher graphite matrix density, better fuel dispersion and higher thermal capabilities than the existing fuel

  5. ATLAS Pixel Detector Upgrade

    CERN Document Server

    Flick, T; The ATLAS collaboration

    2009-01-01

    The first upgrade for higher luminosity at LHC for the ATLAS pixel detector is the insertion of a forth layer, the IBL. The talk gives an overview about what the IBL is and how it will be set up, as well as to give a status of the research and develoment work.

  6. Upgrading Undergraduate Biology Education

    Science.gov (United States)

    Musante, Susan

    2011-01-01

    On many campuses throughout the country, undergraduate biology education is in serious need of an upgrade. During the past few decades, the body of biological knowledge has grown exponentially, and as a research endeavor, the practice of biology has evolved. Education research has also made great strides, revealing many new insights into how…

  7. Upgrade of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, work will be carried out on the CERN switching centre between Monday 23 October 8.00 p.m. and Tuesday 24 October 2.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  8. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  9. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  10. CMS pixel upgrade project

    CERN Document Server

    Kaestli, Hans-Christian

    2010-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7~TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  11. CMS pixel upgrade project

    CERN Document Server

    INSPIRE-00575876

    2011-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7 TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  12. The CDF upgrade

    International Nuclear Information System (INIS)

    Newman-Holmes, C.

    1995-01-01

    The Collider Detector at Fermilab (CDF) has been used to study proton-antiproton collisions at the Fermilab Tevatron since 1985. Over the years, the detector has evolved steadily to increase its physics capability and to keep pace with improvements to the Tevatron. Fermilab is currently building a new Main Injector accelerator which will lead to even larger luminosity values. This paper describes upgrades to CDF that will allow one to exploit the higher luminosity of the Main Injector

  13. LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hennessy, Karol

    2017-02-11

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1}. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm{sup 2} pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  14. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  15. The D0 upgrade

    International Nuclear Information System (INIS)

    Tuts, P.M.

    1992-10-01

    The original D0 detector was proposed in 1983, with a focus on high P T physics using precision measurements of e's, μ's, jets, and missing E T . This detector, as of the summer of 1992, has started data taking at the Fermilab Collider. However, by 1995/6 the luminosity will reach 10 31 cm -2 sec -1 , and the minimum bunch spacing will drop to 396ns from the present 3.5μs (by the Main Injector era, luminosities will approach 10 32 cm -2 sec -1 and minimum bunch spacings may reach 132ns). These changes in the accelerator conditions force us to upgrade or replace a number of detector subsystems in order to meet these new demands. In addition, the upgrade offers us the opportunity to expand the physics horizons to include not only the all important high P T physics menu, but also the low P T physics that has become increasingly important. In this paper we describe the D0 detector upgrade

  16. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  17. The LHCb VELO upgrade

    International Nuclear Information System (INIS)

    Rodríguez Pérez, Pablo

    2013-01-01

    LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to 2×10 33 cm −2 s −1 and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to 5×10 15 1 MeV n eq /cm 2 in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55×55μm 2 pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results

  18. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  19. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  20. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  1. Operator-Oriented Product and Production Process Design for Manufacturing, Maintenance and Upgrading

    NARCIS (Netherlands)

    Rhijn, G. van; Bosch, T.

    2017-01-01

    The nature of production in the manufacturing industry is changing, and companies face large challenges. Customers expect fast delivery times, proven sustainability, flexibility, and frequent product upgrades. To stay competitive and manage rapid technological demands, a parallel, iterative and

  2. A participatory GIS approach to spatial modeling for slum upgrading ...

    African Journals Online (AJOL)

    The most prominent problem of rapid urbanism in Harare is the development of slums and Epworth is a notable example. The quality of planning and decision making in the participatory slum upgrading initiative can be sustainably improved by well managed processes of spatial and socio-economic data collection. More so ...

  3. Public-Interest Benefit Evaluation of Partial- Upgrading Technology

    Directory of Open Access Journals (Sweden)

    G. Kent Fellows

    2017-01-01

    long term, it would also provide important benefits to Alberta from a social perspective. Since partially upgraded crude can be shipped via pipeline without diluent (as bitumen requires, producing it in Alberta would free up pipeline capacity otherwise tied up by current volumes of diluted bitumen or dilbit (diluent typically represents about one-third of each barrel of dilbit. It also reduces the cost to shippers of paying tolls for diluent exported in the dilbit and recovering diluent at the U.S. pipeline terminal, where it is less valuable than if it were recovered in Alberta at the partial upgrader. The value of each barrel produced would also be higher, benefitting oil sands producers. Partial upgrading also seems to promise a lower emissions-intensity profile compared to other bitumen-processing technologies. Based on the model of a single 100,000-barrel-a-day partial upgrader, the value uplift could be $10 to $15 per bitumen barrel. Meanwhile, there could be an average annual increase to Alberta’s GDP of $505 million, and as many as 179,000 person-years of employment created (assuming a 40.5-year operating period. The increase in taxable earnings would increase provincial revenues by an average of $60 million a year, not including additional federal tax revenues. If successful, there would be many such partial upgraders with corresponding multiplication of these benefits. But there remains the critical task of proving partial upgrading technology at a higher scale than current testing. This might also depend on the province helping sustain investors through the “death-valley” between successful research and initial testing and demonstration of full commercial viability. The province has stepped into help technologies cross that “death valley” before. The promise of partial upgrading may well justify, as manager and steward of Alberta’s resources, helping bridge that valley again.

  4. The Bevalac Upgrade Project

    International Nuclear Information System (INIS)

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact

  5. Upgrade Software and Computing

    CERN Document Server

    The LHCb Collaboration, CERN

    2018-01-01

    This document reports the Research and Development activities that are carried out in the software and computing domains in view of the upgrade of the LHCb experiment. The implementation of a full software trigger implies major changes in the core software framework, in the event data model, and in the reconstruction algorithms. The increase of the data volumes for both real and simulated datasets requires a corresponding scaling of the distributed computing infrastructure. An implementation plan in both domains is presented, together with a risk assessment analysis.

  6. Upgrading Enterprise Search

    Energy Technology Data Exchange (ETDEWEB)

    McDunn, R

    2005-04-28

    This presentation will describe the process we went through this past year to upgrade our enterprise search tool from a very old version of Inktomi to the latest version of Verity Ultraseek. We started with requirements gathering and then compared requirements against several available products to determine which product to choose. After purchasing the product, we worked through several defined phases of implementation and customization, with initial rollout late January 2004. Finally, we will show you where we are today and describe future search plans.

  7. Upgrade, rebuild or replace?

    International Nuclear Information System (INIS)

    Forbes, C.A.

    1990-01-01

    Ageing reactor simulators present some tough decisions for utility managers. Although most utilities have chosen the cheaper, upgrading solution as the best compromise between costs and outage length, some US utilities have found that for them, replacement represents the best option. Simulators may be less than ten years old, but they have limited instructor systems, older low fidelity models that cannot reproduce important training scenarios, and out of date, difficult to maintain computers that do not permit much expansion of the models anyway. Perhaps worse than this is the possibility that the simulator may no longer be a faithful reproduction of the referenced plant, or have poor (or non-existent) documentation. (author)

  8. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  9. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  10. ATLAS detector upgrade prospects

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00184940; The ATLAS collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb$^{-1}$ expected for LHC running to 3000 fb $^{-1}$ by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ...

  11. LHCb VELO Upgrade

    CERN Document Server

    van Beuzekom, Martin; Ketel, Tjeerd; Gershon, Timothy; Parkes, Christopher; Reid, Matthew

    2011-01-01

    The VErtex LOcator (VELO) is a vital piece of apparatus for allowing precision measurements in hadronic physics. It provides not only superb impact parameter resolutions but also excellent momentum resolution, both important discriminating tools for precision high energy physics. This poster focuses on the R&D going into the future LHCb VELO detector. At present there are two proposed options for the upgrade; pixel chips or strip detectors. The LHCb upgrade is designed with higher luminosities and increased yields in mind. In order to get more out of the LHCb detector changes to the front end electronics will have to be made. At present, the first level hardware trigger is sets a limiting factor on the maximum efficiency for hadronic channels. As the VELO is positioned so close the proton-proton interaction region, whatever the choice of sensor, we will require efficient cooling and some proposed solutions are outlined. The LHCb TimePix telescope has had a very successful years running, with various devic...

  12. ATLAS Detector Upgrade Prospects

    International Nuclear Information System (INIS)

    Dobre, M

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb −1 expected for LHC running by the end of 2018 to 3000 fb −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV. (paper)

  13. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  14. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  15. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  16. The Fermilab ACNET upgrade

    International Nuclear Information System (INIS)

    Briegel, C.; Johnson, G.; Winterowd, L.

    1990-01-01

    The Fermilab Accelerator Controls Network (ACNET) upgrade consists of a new physical medium (IEEE 802.5 token ring), additions to the calling sequence and added processor support. ACNET is the accelerator control backbone network for all data communication. A proprietary network was replaced by an IEEE standard enabling an open network with excellent characteristics for the control system. The calling sequence was enhanced for the added capabilities of the token-ring interface such as 'gather-read' and 'scatter-write'. In addition to prior support of DEC PDP11s under RS11M and VAXs under VMS, the ACNET calling sequence was implemented in the language C for the IBM PC with MS-DOS and Motorola 680x0 with MTOS using VME bus. Additional support is in progress for Intel 80x86 with MTOS using Multibus II. (orig.)

  17. Biogas upgrading and utilization: Current status and perspectives

    DEFF Research Database (Denmark)

    Angelidaki, Irini; Treu, Laura; Tsapekos, Panagiotis

    2018-01-01

    Biogas production is an established sustainable process for simultaneous generation of renewable energy and treatment of organic wastes. The increasing interest of utilizing biogas as substitute to natural gas or its exploitation as transport fuel opened new avenues in the development of biogas...... upgrading techniques. The present work is a critical review that summarizes state-of-the-art technologies for biogas upgrading and enhancement with particular attention to the emerging biological methanation processes. The review includes comprehensive description of the main principles of various biogas...

  18. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  19. ISTTOK control system upgrade

    International Nuclear Information System (INIS)

    Carvalho, Ivo S.; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-01-01

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel ® Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators

  20. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  1. Upgrade plans for hadron calorimeter in the CMS detector

    International Nuclear Information System (INIS)

    Dugad, Shashikant R.

    2010-01-01

    The Large Hadron Collider (LHC) is expected to undergo upgrades in two phases in next decade. Luminosity at the completion of the second phase is expected to increase by an order of magnitude to 10 35 /cm 2 s. The upgrade of the CMS Hadron Calorimeter (HCAL) is being planned to sustain an increased dose of radiation and challenges arising from occupancy rate due to higher luminosity. Replacement of existing photo readout device by silicon photomultipliers is being planned for the HCAL. Detailed studies performed on this device are presented. Plans on the upgrade of the front-end electronics, DAQ, trigger, and the active elements in some part of the detector will be discussed in detail.

  2. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    Spannagel, Simon

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  3. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  4. The Atlas upgrade project

    International Nuclear Information System (INIS)

    Bollinger, L.M.

    1988-01-01

    ATLAS is a heavy-ion accelerator system consisting of a 9-MV tandem electrostatic injector coupled to a superconducting linac. A project now well advanced will upgrade the capabilities of ATLAS immensely by replacing the tandem and its negative-ion source with a positive-ion injector that consists of an electron-cyclotron resonance (ECR) ion source and a 12-MV superconducting injector linac of novel design. This project will increase the beam intensity 100 fold and will extend the projectile-mass range up to uranium. Phase 1 of the work, which is nearing completion in late 1988, will provide an injector comprising the ECR source and its 350-kV voltage platform, beam analysis and bunching systems, beam lines, and a prototype 3-MV linac. The ECR source and its voltage platform are operational, development of the new class of low-frequency interdigital superconducting resonators required for the injector linac has been completed, and assembly of the whole system is in progress. Test runs and then routine use of the Phase 1 injector systems are planned for early 1989, and the final 12-MV injector linac will be commissioned in 1990. 12 refs., 6 figs

  5. Superhilac upgrade project

    International Nuclear Information System (INIS)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10 7 to 5 x 10 7 ions/pulse, allowing accurate Lamb shift measurements to be made in U 90+ and U 91+ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown

  6. Altair performance and upgrades

    Science.gov (United States)

    Lai, Olivier; Véran, Jean-Pierre; Herriot, Glen; White, John; Ball, Jesse; Trujillo, Chad

    2014-07-01

    Altair is the facility single conjugate AO system for Gemini North. Although it has been in operation for more than 10 years (and upgraded to LGS in 2007), Altair's performance is degraded by three main issues: vibrations of the telescope and instrument support structure, spatial aliasing on centroid offsets from the M2 support structure print-through on the optical surface and static non-common path aberrations. Monte-Carlo simulations can reproduce the behavior of Altair when including these three effects and they are roughly of the same order of magnitude. Solutions or mitigations are being investigated to overcome these nefarious effects and restore Altair's performance to its nominal level. A simplex algorithm as well as a phase diversity approach are being investigated to measure and correct for static aberrations. A high accuracy phase map of the M2 print-through has been obtained and is being used to calibrate and/or filter centroids affected by aliasing. A new real time computer is under consideration, to be able to handle more advanced controllers, especially notch filters to combat vibrations. In this paper we will report on the various simulations and on-sky results of this rejuvenation of one of Gemini's workhorse instruments.

  7. Alberta propylene upgrading prospects

    International Nuclear Information System (INIS)

    2000-03-01

    A very significant byproduct recovery and purification scheme is at present being prepared by TransCanada Midstream (TCMS). Alberta Economic Development commissioned an independent study to identify propylene supply options while proceeding with the evaluation of various propylene derivatives with regard to their fit with the Alberta context. Identification of chemical companies with derivative interests was also accomplished. By 2005, it is estimated that 280 kilo-tonnes of propylene will be available on an annual basis from byproduct sources. Those sources are oil sands upgraders, ethylene plants and refineries. The ranges of impurities and supply costs vary between the different sources. An option being considered involves pipeline and rail receipt with a major central treating and distillation facility for the production of polymer grade (PG) propylene with propane and other smaller byproducts. Special consideration was given to three chemicals in this study, namely: polypropylene (PP), acrylonitrile (ACN), and acrylic acid (AA). Above average growth rates were identified for these chemicals: demand is growing at 6 to 7 per cent a year for both PP and ACN, while demand for AA grows at 8 per cent annually. Two other possibilities were identified, propylene oxide (PO) and phenol. The study led to the conclusion that low capital and operating costs and shipping costs to the Pacific Rim represent advantages to the development of propylene derivatives in the future in Alberta. 4 refs., 87 tabs., 7 figs

  8. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  9. Mining Upgrades to Reduce Pollution

    Science.gov (United States)

    Settlement with Southern Coal Corporation and 26 affiliates requires the companies to comprehensively upgrade their coal mining and processing operations to prevent polluted wastewater from threatening rivers and streams and communities across Appalachia.

  10. Silicon Tracking Upgrade at CDF

    International Nuclear Information System (INIS)

    Kruse, M.C.

    1998-04-01

    The Collider Detector at Fermilab (CDF) is scheduled to begin recording data from Run II of the Fermilab Tevatron in early 2000. The silicon tracking upgrade constitutes both the upgrade to the CDF silicon vertex detector (SVX II) and the new Intermediate Silicon Layers (ISL) located at radii just beyond the SVX II. Here we review the design and prototyping of all aspects of these detectors including mechanical design, data acquisition, and a trigger based on silicon tracking

  11. WNP-2 core model upgrade

    International Nuclear Information System (INIS)

    Golightly, C.E.; Ravindranath, T.K.; Belblidia, L.A.; O'Farrell, D.; Andersen, P.S.

    2006-01-01

    The paper describes the core model upgrade of the WNP-2 training simulator and the reasons for the upgrade. The core model as well as the interface with the rest of the simulator are briefly described . The paper also describes the procedure that will be used by WNP-2 to update the simulator core data after future core reloads. Results from the fully integrated simulator are presented. (author)

  12. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  13. Upgrading inflatable door seals

    International Nuclear Information System (INIS)

    Sykes, T.M.; Metcalfe, R.; Welch, L.A.; Josefowich, J.M.

    1997-01-01

    Inflatable door seals are used for airlocks in CANDU stations. They have been a significant source of unreliability and maintenance cost. A program is underway to improve their performance and reliability, backed by environmental qualification testing. Only commercial products and suppliers existed in 1993. For historical reasons, these 'existing products' did not use the most durable material then available. In hindsight, neither had they been adapted nor optimized to combat conditions often experienced in the plants-sagging doors, damaged sealing surfaces, and many thousands of openings and closings per year. Initial attempts to involve the two existing suppliers in efforts to upgrade these seals were unsuccessful. Another suitable supplier had therefore to be found, and a 'new,' COG-owned seal developed; this was completed in 1997. This paper summarizes its testing, along with that of the two existing products. Resistance to aging has been improved significantly. Testing has shown that an accident can be safely withstood after 10 years of service or 40,000 openings-closings, whichever comes first. AECL's Fluid Sealing Technology Unit (FSTU) has invested in the special moulds, test fixtures and other necessary tooling and documentation required to begin commercial manufacture of this new quality product. Accordingly, as with FSTU's other nuclear products such as pump seals, the long-term supply of door seals to CANDU plants is now protected from many external uncertainties-e.g., commercial products being discontinued, materials being changed, companies going out of business. Manufacturing to AECL's detailed specifications is being subcontracted to the new supplier. FSTU is performing the quality surveillance, inspection, testing, and customer service activities concomitant with direct responsibility for supply to the plants. (author)

  14. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  15. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  16. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  17. The D0 detector upgrade

    International Nuclear Information System (INIS)

    Bross, A.D.

    1995-02-01

    The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector

  18. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  19. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  20. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  1. Upgrading the BEPC control system

    International Nuclear Information System (INIS)

    Yang Liping; Wang Lizheng; Liu Shiyao

    1992-01-01

    The BEPC control system has been put into operation and operated normally since the end of 1987. Three years's experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages araised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc.. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DEC net and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance. (author)

  2. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  3. Reflections on a digital upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tadjalli, M.

    2013-07-01

    Upon receiving US NRC's approval in 2010, the first RPS/ESPS digital upgrade using TELEPERM® XS technology was successfully installed in Spring of 2011 at the first Unit of a three-unit station, followed by the 2nd Unit installation in spring of 2012. Both Units' systems have been operating flawlessly since installation. After about two years of operation, a reflection on digital upgrades and lessons learned, from a vendor perspective, provides valuable insight for the commercial nuclear power industry.

  4. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  5. Sustained growth but non-sustainable urbanisation in Penang, Malaysia

    DEFF Research Database (Denmark)

    Wangel, Arne; Fold, Niels

    1998-01-01

    of trade unions, which lack the strength to substantially improve wages or influence the institutions of the labour market. So a frenzied labour market tries to balance the upgrading of skills and the control of wages. The paper concludes that a focus on sustainable urbanisation will renew the debate...

  6. Old PCs: Upgrade or Abandon?

    Science.gov (United States)

    Perez, Ernest

    1997-01-01

    Examines the practical realities of upgrading Intel personal computers in libraries, considering budgets and technical personnel availability. Highlights include adding RAM; putting in faster processor chips, including clock multipliers; new hard disks; CD-ROM speed; motherboards and interface cards; cost limits and economic factors; and…

  7. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron

  8. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the re-availa...

  9. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron r...

  10. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Angioni, C.; Atanasiu, C. V.; Balden, M.; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Bobkov, V.; Boom, J.; Bottino, A.; Braun, F.; Brudgam, M.; Buhler, A.; Burckhart, A.; Chankin, A.; Classen, I.G.J.; Conway, G. D.; Coster, D. P.; de Marne, P.; D' Inca, R.; Drube, R.; Dux, R.; Eich, T.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fahrbach, H. U.; Fattorini, L.; Fischer, R.; Flaws, A.; Funfgelder, H.; Fuchs, J. C.; Gal, K.; Munoz, M. G.; Geiger, B.; Adamov, M. G.; Giannone, L.; Giroud, C.; Gorler, T.; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Gunter, S.; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; Hauff, T.; Heinemann, B.; Herrmann, A.; Hicks, N.; Hobirk, J.; Hohnle, H.; Holzl, M.; Hopf, C.; Horton, L.; Huart, M.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kasemann, C. P.; Kalvin, S.; Kardaun, O.; Kaufmann, M.; Kirk, A.; Klingshirn, H. J.; Kocan, M.; Kocsis, G.; Kollotzek, H.; Konz, C.; Koslowski, R.; Krieger, K.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Leipold, F.; Leuterer, F.; Lohs, A.; N C Luhmann Jr.,; Lunt, T.; Lyssoivan, A.; Maier, H.; Maggi, C.; Mank, K.; Manso, M. E.; Maraschek, M.; Martin, P.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Muller, H. W.; Munich, M.; Murmann, H.; Neu, G.; Neu, R.; Nold, B.; Noterdaeme, J. M.; Park, H. K.; Pautasso, G.; Pereverzev, G.; Podoba, Y.; Pompon, F.; Poli, E.; Polochiy, K.; Potzel, S.; Prechtl, M.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reiter, B.; Ribeiro, T.; Riedl, R.; Rohde, V.; Roth, J.; Rott, M.; Ryter, F.; Sandmann, W.; Santos, J.; Sassenberg, K.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schramm, G.; Schrittwieser, R.; Schweinzer, J.; Scott, B.; Sempf, M.; Serra, F.; Sertoli, M.; Siccinio, M.; Sigalov, A.; Silva, A.; Sips, A.C.C.; Sommer, F.; Stabler, A.; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Szepesi, T.; Tardini, G.; Tichmann, C.; Told, D.; Treutterer, W.; Urso, L.; Varela, P.; Vincente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Vorpahl, C.; Wagner, D.; Weller, A.; Wenninger, R.; Wieland, B.; Wigger, C.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; Wursching, E.; Yadikin, D.; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the

  11. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Zohm, H.; Adamek, J.; Angioni, C.

    2009-01-01

    ASDEX Upgrade was operated with a fully W-covered wall in 2007 and 2008. Stationary H-modes at the ITER target values and improved H-modes with H up to 1.2 were run without any boronization. The boundary conditions set by the full W wall (high enough ELM frequency, high enough central heating and...

  12. Upgrading of the Budapest reactor

    International Nuclear Information System (INIS)

    Rosta, L.

    1986-10-01

    The increasing importance of neutron sources, high demand for irradiation and experimental facilities as well as improved safety requirements in the 'eighties, necessitate not only a technical modernization of the Reactor but an overall upgrade including instrumentation. Such a reconstruction was decided by the Hungarian governement in 1983

  13. Upgrading of the West Area

    CERN Multimedia

    1983-01-01

    The rejigged main hall (EHW1) in the West Area: on background, below the crane, is the brown yoke of the Omega magnet which had been resited. The upgrading was completed by the time in July when 400 GeV protons arrived. See Annual Report 1983 p. 107.

  14. LHC challenges and upgrade options

    Energy Technology Data Exchange (ETDEWEB)

    Bruning, O [CERN AB/ABP, Y03600, 1211 Geneva 23 (Switzerland)], E-mail: Oliver.Bruning@cern.ch

    2008-05-15

    The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

  15. LHC challenges and upgrade options

    International Nuclear Information System (INIS)

    Bruning, O

    2008-01-01

    The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex

  16. Five-Megajoule Homopolar Upgrade

    Science.gov (United States)

    1981-06-01

    near the bearing lands to monitor temperature rise during motoring. AISI 4140 steel sleeves were shrunk onto the beryllium copper shaft of the new...MJ HPG in this upgrade. Rotor and Shaft A 0.75-m diameter, 0.28-m thick AISI 4340 air- craft quality steel rotor is shrunk on to a 0. 14-m diameter

  17. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Aguiam, D.; Aho-Mantila, L.

    2017-01-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were design...

  18. Microbial electrochemical separation of CO2 for biogas upgrading

    DEFF Research Database (Denmark)

    Kokkoli, Argyro; Zhang, Yifeng; Angelidaki, Irini

    2018-01-01

    was obtained at 1.2 V, inlet biogas rate of 0.088 mL/h/mL reactor and NaCl concentration of 100 mM at a 5-day operation. Meanwhile, the organic matter of the domestic wastewater in the anode was almost completely removed at the end. The study demonstrated a new sustainable way to simultaneously upgrade biogas......Biogas upgrading to natural gas quality has been under focus the recent years for increasing the utilization potential of biogas. Conventional methods for CO2 removal are expensive and have environmental challenges, such as increased emissions of methane in the atmosphere with serious greenhouse...... impact. In this study, an innovative microbial electrochemical separation cell (MESC) was developed to in-situ separate and regenerate CO2 via alkali and acid regeneration. The MESC was tested under different applied voltages, inlet biogas rates and electrolyte concentrations. Pure biomethane...

  19. Upgraded wood residue fuels 1995

    International Nuclear Information System (INIS)

    Vinterbaeck, J.

    1995-01-01

    The Swedish market for upgraded residue fuels, i.e. briquettes, pellets and wood powder, has developed considerably during the nineties. The additional costs for the upgrading processes are regained and create a surplus in other parts of the system, e.g. in the form of higher combustion efficiencies, lower investment costs for burning equipment, lower operation costs and a diminished environmental impact. All these factors put together have resulted in a rapid growth of this part of the energy sector. In 1994 the production was 1.9 TWh, an increase of 37 % compared to the previous year. In the forthcoming heating season 1995/96 the production may reach 4 TWh. 57 refs, 11 figs, 6 tabs

  20. AliPDU Package Upgrade

    CERN Document Server

    "Martin, Michael

    2015-01-01

    "AliPDU Package" is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  1. AliPDU Package Upgrade

    CERN Document Server

    Martin, Michael

    2015-01-01

    AliPDU Package is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  2. The TEXT upgrade vertical interferometer

    International Nuclear Information System (INIS)

    Hallock, G.A.; Gartman, M.L.; Li, W.; Chiang, K.; Shin, S.; Castles, R.L.; Chatterjee, R.; Rahman, A.S.

    1992-01-01

    A far-infrared interferometer has been installed on TEXT upgrade to obtain electron density profiles. The primary system views the plasma vertically through a set of large (60-cm radialx7.62-cm toroidal) diagnostic ports. A 1-cm channel spacing (59 channels total) and fast electronic time response is used, to provide high resolution for radial profiles and perturbation experiments. Initial operation of the vertical system was obtained late in 1991, with six operating channels

  3. Upgrading Temelin to international standards

    International Nuclear Information System (INIS)

    Anderson, J.J.; Gisoni, G.A.; Stormer, T.D.

    1994-01-01

    The digital technology being installed to upgrade the Instrumentation and Control system at the Temelin twin VVER-1000 station in the Czech Republic will allow the plant to operate more safely because it allows key information to be organised and presented to the operators, enabling them to make better informed decisions about the status of the plant. The new system is based on proven technology previously applied at Beznau in Switzerland and Sizewell B in the UK. (author)

  4. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  5. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  6. Towards novel biogas upgrading processes

    Energy Technology Data Exchange (ETDEWEB)

    Privalova, E.

    2013-06-01

    Biogas production has considerable development possibilities not only in Finland but all over the world since it it the easiest way of creating value out of various waste fractions and represents an alternative source of renewable energy. Development of efficient biogas upgrading technology has become an important issue since it improves the quality of biogas and for example facilitating its injection into the natural gas pipelines. Moreover, such upgrading contributes to resolving the issue of increasing CO{sub 2} emissions and addresses the increasing climate change concerns. Together with traditional CO{sub 2} capturing technologies a new class of recently emerged sorbents such as ionic liquids is claimed as promising media for gas separations. In this thesis, an extensive comparison of the performance of different solvents in terms of CO{sub 2} capture has been performed. The focus of the present study was on aqueous amine solutions and their mixtures, traditional ionic liquids, 'switchable' ionic liquids and poly(ionic liquid)s in order to reveal the best option for biogas upgrading. The CO{sub 2} capturing efficiency for the most promising solvents achieved values around 50-60 L CO{sub 2}/L absorbent. These values are superior to currently widely applied water wash biogas upgrading system. Regeneration of the solvent mixtures appeared to be challenging since the loss of initial efficiency upon CO{sub 2} release was in excess of 20-40 vol %, especially in the case of aqueous amine solutions. In contrast, some of the ionic liquids displayed reversible behavior. Thus, for selected 'switchable' ionic and poly(ionic liquid)s the CO{sub 2} absorption/regeneration cycles were performed 3-4 times without any notable efficiency decrease. The viscosity issue, typical for ionic liquids upon CO{sub 2} saturation, was addressed and the information obtained was evaluated and related to the ionic interactions. The occurrence of volatile organic compounds

  7. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  8. Recent Upgrades and Extensions of the ASDEX Upgrade ECRH System

    Science.gov (United States)

    Wagner, Dietmar; Stober, Jörg; Leuterer, Fritz; Monaco, Francesco; Münich, Max; Schmid-Lorch, Dominik; Schütz, Harald; Zohm, Hartmut; Thumm, Manfred; Scherer, Theo; Meier, Andreas; Gantenbein, Gerd; Flamm, Jens; Kasparek, Walter; Höhnle, Hendrik; Lechte, Carsten; Litvak, Alexander G.; Denisov, Gregory G.; Chirkov, Alexey; Popov, Leonid G.; Nichiporenko, Vadim O.; Myasnikov, Vadim E.; Tai, Evgeny M.; Solyanova, Elena A.; Malygin, Sergey A.

    2011-03-01

    The multi-frequency Electron Cyclotron Heating (ECRH) system at the ASDEX Upgrade tokamak employs depressed collector gyrotrons, step-tunable in the range 105-140 GHz. The system is equipped with a fast steerable launcher allowing for remote steering of the ECRH RF beam during the plasma discharge. The gyrotrons and the mirrors are fully integrated in the discharge control system. The polarization can be controlled in a feed-forward mode. 3 Sniffer probes for millimeter wave stray radiation detection have been installed.

  9. LHCb Upgraded RICH 2 Engineering Design Review Report

    CERN Document Server

    Garsed, Philip John; Cardinale, Roberta; Petrolini, Alessandro; Benettoni, Massimo; Simi, Gabriele; Zago, M; Easo, Sajan; D'Ambrosio, Carmelo; Frei, Christoph; He, Jibo; Piedigrossi, Didier

    2016-01-01

    During the Long Shutdown 2 of the LHC, the LHCb experiment and, specifically, its two Ring Imaging Cherenkov (RICH) detectors will undergo a major upgrade. RICH 2 will be refurbished with new photon detectors and their associated electronics, with the capability of up to 40 MHz sustained acquisition rate. A new support and cooling system has been developed for the two photodetector arrays, retaining the vessel, gas and optical systems unchanged. This document describes their new mechanical arrangement, its engineering design, installation and alignment. A summary of the project schedule and Institute responsibilities is provided.

  10. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  11. The Upgraded D0 detector

    Energy Technology Data Exchange (ETDEWEB)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U.

    2005-07-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  12. Upgrades and their training impact

    International Nuclear Information System (INIS)

    Geise, W.B.

    1991-01-01

    In January, 1990, implementation of thermal hydraulic and core model upgrades to the Brunswick Simulator was completed. Static and dynamic NRC examination preparation, Licensed Operator Requalification training and training material development had to be completed to support an April, 1990's NRC exam date. Dramatic simulator improvements resulted in expanded performance. Unfortunately, insufficient time was available to fully retrain operators before their examinations. Because of this and other factors, the examinations resulted in 14 of 20 operators failing the dynamic simulator examination. The following paper describes the BSEP simulator impact on Licensed Training in 1990

  13. LHC Status and Upgrade Challenges

    Science.gov (United States)

    Smith, Jeffrey

    2009-11-01

    The Large Hadron Collider has had a trying start-up and a challenging operational future lays ahead. Critical to the machine's performance is controlling a beam of particles whose stored energy is equivalent to 80 kg of TNT. Unavoidable beam losses result in energy deposition throughout the machine and without adequate protection this power would result in quenching of the superconducting magnets. A brief overview of the machine layout and principles of operation will be reviewed including a summary of the September 2008 accident. The current status of the LHC, startup schedule and upgrade options to achieve the target luminosity will be presented.

  14. ECRH experiments in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Guenter, S.; Hobirk, J.; Kirov, K.; Ryter, F.; Wolf, R.; Zohm, H.; Gantenbein, G.

    2001-01-01

    In ASDEX Upgrade ECRH and ECCD with a power of up to 2 MW has been used. With counter ECCD in discharges with an internal transport barrier we achieved an electron temperature of ≅13 keV. In low density ohmic plasmas we obtained an rf driven current of ≅80% both in co- and counter directions. Neoclassical tearing modes have been completly stabilised by driving a current on the resonant q-surface. Electron heat transport has been studied in standard L- and H-mode plasmas and can be described by a dependence on a critical electron temperature gradient

  15. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  16. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  17. ALICE Upgrades: Plans and Potentials

    CERN Document Server

    Tieulent, Raphael

    2015-01-01

    The ALICE collaboration consolidated and completed the installation of current detectors during LS1 with the aim to accumulate 1 nb$^{-1}$ of Pb-Pb collisions during Run 2 corresponding to about 10 times the Run 1 integrated luminosity. In parallel, the ALICE experiment has a rich detector upgrade programme scheduled during the second LHC long shutdown (LS2, 2018-2019) in order to fully exploit the LHC Runs 3 and 4. The main objectives of this programme are: improving the tracking precision and enabling the read-out of all Pb-Pb interactions at a rate of up to 50 kHz, with the goal to record an integrated luminosity of 10 nb$^{-1}$ after LS2 in minimum-bias trigger mode. This sample would represent an increase by a factor of one hundred with respect to the minimum-bias sample expected during Run 2. The implementation of this upgrade programme, foreseen in LS2, includes: a new low-material Inner Tracking System at central rapidity with a forward rapidity extension to add vertexing capabilities to the current M...

  18. Upgrade and modernization of NBSR

    International Nuclear Information System (INIS)

    Williams, Robert E.

    1995-01-01

    The NBSR, a 20-MW research reactor operated by the National Institute of Standards and Technology, has become the leading US laboratory in neutron research. About 1000 scientists from 200 industries, government and foreign laboratories, and universities conducted experiments at the NBSR in 19931. Since 1990, when the first instruments in the Cold Neutron Research Facility (CNRF) became available, the number of research participants has doubled. A major program of modernization and facility upgrade was initiated in order to meet this growing demand, and to assure safe and reliable reactor operations for 30 additional years. A scheduled shutdown, begun in late May 1994, is nearing completion at this writing (May 1995). To upgrade the CNRF, the D 2 0 cold neutron source has been replaced with a liquid hydrogen cold source, and the remaining four neutron guides are being installed. In addition, the primary and secondary cooling systems have been modernized with the installation of plate heat exchangers, and the refueling system has been completely refurbished. Periodic maintenance is also being done. The entire D20 primary coolant inventory is about to be replaced, and new shim arms have been installed

  19. Formaldehyde OMI operational retrieval upgrades

    Science.gov (United States)

    Gonzalez Abad, G.; Chance, K.; Liu, X.

    2013-05-01

    Total column of formaldehyde (HCHO), a proxy for biogenic emissions, can be observed from satellites using the ultraviolet region of the spectrum. The operational HCHO retrievals from the Ozone Monitoring Instrument (OMI) on board the AURA satellite, part of NASA's A-train constellation of Earth Observing satellites, are described. The operational retrieval, based on a basic optical absorption spectroscopy (BOAS) algorithm, has been affected by the degradation of the instrument especially from 2008 onwards. The most significant problems are the unrealistic increasing high background concentrations of HCHO retrieved from OMI and the row anomaly. An upgrade for the original operational algorithm is therefore needed to ensure its trend quality and to account for these difficulties. The strategies implemented to deal with the instrumental degradation are presented here. Air mass factors (AMFs) in the current fitting window show significant wavelength dependence. Fitting uncertainties can potentially be improved by including shorter wavelengths as long as the AMFs wavelength dependence is taken into account. As part of these improvements a look-up table of wavelength-dependent AMFs have been calculated. Using this new table it is possible to retrieve the HCHO total column directly, weighting the HCHO cross sections with the wavelength-dependent AMFs. Additionally, the pixels affected by the row anomaly are now flagged in the level 2 data generated with the upgraded algorithm.

  20. BNFL Magnox - Upgrades and enhancements

    International Nuclear Information System (INIS)

    Udbinac, M.J.

    2006-01-01

    In the past, generic models, restrictive budgets,and general shortages of resources have limited the scope of the UK's older Magnox simulators. Nevertheless, the simulators evolved slowly over time, becoming more like their reference plants, as resources became available. Three years ago, the Training and Development Branch of Magnox Electric plc took a giant leap, investing significant resources into the modernization of their training simulators. New hardware was built, including a new simulator room. The simulator software was ported from Unix running on outdated servers to new servers running Microsoft Windows NT. Perhaps most significantly, major model enhancements were made to key plant systems to significantly increase the likeness of each simulator to its reference plant. The upgrade to NT, the addition of state-of-the-art instructor stations, and some of the model enhancements were achieved with SimPort, an all-inclusive simulation package provided by DS and S. This paper will provide a more detailed view of the Magnox modular simulators, including how they are used and how they have benefited from the enhancements and upgrades implemented during the project. (author)

  1. Heavy water upgrader of 'Fugen'

    International Nuclear Information System (INIS)

    Matsushita, Tadashi; Sasaki, Shigeo

    1980-01-01

    The nuclear power station of the advanced thermal prototype reactor ''Fugen'' has continued the smooth operation since it started the fullscale operation in March, 1979. Fugen is the first heavy water-moderated, boiling light water-cooled reactor in Japan, and its outstanding feature is the use of heavy water as the moderator. The quantity of heavy water retained in Fugen is about 140 m 3 , and the concentration is 99.8 wt.%. This heavy water had been made is USA, and was imported from F.R. of Germany where it had been used. Heavy water is an internationally regulated material, and it is very expensive and hard to purchase. Therefore in order to prevent the deterioration of heavy water and to avoid its loss as far as possible, the management of the quantity and the control of the water quality have been carried out carefully and strictly. The generation of deteriorated heavy water occurs from the exchange of ion exchange resin for poison removal and purification. The heavy water upgrader reconcentrates the deteriorated heavy water of high concentration and returns to the heavy water system, and it was installed for the purpose of reducing the purchase of supplementary heavy water. The outline of the heavy water upgrader, its construction, the performance test and the operation are described. (Kako, I.)

  2. ALICE upgrades its powerful eyes

    CERN Multimedia

    Yuri Kharlov, ALICE Collaboration

    2013-01-01

    The ALICE Photon Spectrometer (PHOS) is a high-resolution photon detector that measures the photons coming out of the extremely hot plasma created in the lead-lead collisions at the LHC. Taking advantage of the long accelerator shut-down, the ALICE teams are now repairing and upgrading the existing modules and getting ready to install the brand-new module in time for the next run. The upgraded PHOS detector will be faster and more stable with wider acceptance and improved photon identification.   PHOS crystal matrix during repair. The key feature and the main complexity of the ALICE PHOS detector is that it operates at a temperature of -25°C, which makes it the second-coldest equipment element at the LHC after the cryogenic superconducting magnets. Since 2009 when it was installed, the PHOS detector, with its cold and warm volumes, has been immersed in airtight boxes to avoid condensation in the cold volumes. The 10,752 lead tungstate crystals of the PHOS were completely insulated fr...

  3. Alberta oil sands crudes : upgrading and marketing

    International Nuclear Information System (INIS)

    Ashar, M.

    2008-01-01

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs

  4. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  5. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  6. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  7. FTU bolometer electronic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pollastrone, Fabio, E-mail: fabio.pollastrone@enea.it [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy); Neri, Carlo; Florean, Marco; Ciccone, Giovanni [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy)

    2013-10-15

    Highlights: ► Design and realization of a new bolometer electronic system. ► Many improvements over the actual commercial system. ► Architecture based on digital electronic hardware with minimal analog front end. ► Auto off-set correction, real time visualization features and small system size. ► Test results for the electronic system. -- Abstract: The FTU (Frascati Tokamak Upgrade) requires a bolometer diagnostic in order to measure the total plasma radiation. The current diagnostic architecture is based on a full analog multichannel AC bolometer system, which uses a carrier frequency amplifier with a synchronous demodulation. Taking into account the technological upgrades in the field of electronics, it was decided to realize an upgrade for the bolometric electronic system by using a hybrid analog/digital implementation. The new system developed at the ENEA Frascati laboratories has many improvements, and mainly a massive system volume reduction, a good measurement linearity and a simplified use. The new hardware system consists of two subsystems: the Bolometer Digital Control and the Bolometer Analog System. The Bolometer Digital Control can control 16 bolometer bridges through the Bolometer Analog System. The Bolometer Digital Control, based on the FPGA architecture, is connected via Ethernet with a PC; therefore, it can receive commands settings from the PC and send the stream of bolometric measurements in real time to the PC. In order to solve the cross-talk between the bridges and the cables, each of the four bridges in the bolometer head receives a different synthesized excitation frequency. Since the system is fully controlled by a PC GUI (Graphic User Interface), it is very user friendly. Moreover, some useful features have been developed, such as: auto off-set correction, bridge amplitude regulation, software gain setting, real time visualization, frequency excitation selection and noise spectrum analyzer embedded function. In this paper, the

  8. Superconducting magnet development for the LHC upgrades

    International Nuclear Information System (INIS)

    Rossi, Lucio

    2012-01-01

    LHC is now delivering proton and heavy ion collisions at the highest energy. Upgrading the LHC beyond its design performance is a long term program that started during the LHC construction, with some fundamental R and D programs. The upgrade program is based on a vigorous superconductor and magnet R and D, aimed at increasing the field in accelerator magnets from 8 T to 12 T for the luminosity upgrade, with the scope of increasing the collider luminosity by a factor 5 to 10 from 2022. The upgrade program might continue with the LHC energy upgrade, which would require magnets producing field in the range of 16-20 T. The results obtained so far and the future challenges are discussed together with the possible plan to reach the goals. (author)

  9. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  10. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  11. ATR Technical Specification Upgrade Program

    International Nuclear Information System (INIS)

    McCracken, R.T.; Durney, J.L.; Freund, G.A.

    1990-01-01

    The Advanced Test Reactor (ATR) is a 250 MW, uranium-aluminum fueled test reactor which began full power operation in 1969. The initial operation was controlled by an Operating Limits document based on the original Safety Analysis Report. Additional safety bases were later developed to support Technical Specifications which were approved and implemented in 1977. The Technical Specifications which were initially developed with content and format specified in ANSI/ANS--15.1, ''The Development of Technical Specifications for Research Reactors.'' The safety basis documentation and the Technical Specifications have been updated as required to maintain them current with the ATR facility configuration. All revisions have been made with a content, format and style consistent with the original. A major, two-phase program to upgrade the content, format and style is in progress. This paper describes the first phase of this program

  12. Five-megajoule homopolar upgrade

    International Nuclear Information System (INIS)

    Bullion, T.M.; Zowarka, R.C.; Aanstoos, T.A.; Weldon, W.F.; Rylander, H.G.; Woodson, H.H.

    1981-01-01

    The five-megajoule homopolar generator (5-MJ HPG) designed and built in 1974 by the Center for Eelctromechanics at the University of Texas at Austin (CEM-UT) was the result of an engineering feasibility study that examined alternate means of pulsed energy storage for controlled thermonuclear fusion experiments. The machine proved very reliable and useful in a variety of applications, notably pulsed resistance welding, and was modified in 1978 to improve its flexibility and ease of maintenance. CEM-UT is now completing a major upgrading of this HPG to a hydraulically motored, 10-MJ, 47-V, 1.02-MA device capable of welding large-section, high-carbon railroad rail. This report considers the design and fabrication of the new rotor, shaft, brush mechanisms, field coil, making switch, busbar system, and control system, as well as the addition of the 31-MPa (4500 psi) hydraulic motoring system. Future applications of the 10-MJ HPG are also discussed

  13. LHCb Upgrade: Scintillating Fibre Tracker

    International Nuclear Information System (INIS)

    Tobin, Mark

    2016-01-01

    The LHCb detector will be upgraded during the Long Shutdown 2 (LS2) of the LHC in order to cope with higher instantaneous luminosities and to read out the data at 40 MHz using a trigger-less read-out system. All front-end electronics will be replaced and several sub-detectors must be redesigned to cope with higher occupancy. The current tracking detectors downstream of the LHCb dipole magnet will be replaced by the Scintillating Fibre (SciFi) Tracker. The SciFi Tracker will use scintillating fibres read out by Silicon Photomultipliers (SiPMs). State-of-the-art multi-channel SiPM arrays are being developed to read out the fibres and a custom ASIC will be used to digitise the signals from the SiPMs. The evolution of the design since the Technical Design Report in 2014 and the latest R & D results are presented.

  14. Upgrading to lead firm position via international acquisition: learning from the global biomass power plant industry

    DEFF Research Database (Denmark)

    Hansen, Ulrich Elmer; Fold, Niels; Hansen, Teis

    2016-01-01

    This article examines the case of a Chinese firm that has upgraded to lead firm position in the global biomass power plant industry mainly through acquisitions of technological frontier firms in Denmark. Sustaining the lead firm position was, however, challenged by difficulties in developing...... innovative capability. Drawing on the literature on (i) firm-level technological capability and (ii) knowledge transfer in international acquisitions, we explain the reasons for insufficient innovative capability building. Based on these empirical findings, we suggest maintaining the existing upgrading...

  15. Research on Upgrade Path to Technology Innovation of Resource-based SMEs in China

    Science.gov (United States)

    Jie, Xu

    2017-08-01

    Complexity, diversity and coordination are features of technology innovation of resource-based SMEs in China. This paper studies on the key factors of macro-environment, cooperation among enterprises and enterprise interior, which influence the upgrading of technology innovation of resource-based SMEs in China. This paper constructs integrated system of technology innovation to analyse the upgrade path to technology innovation of resource-based SMEs in China, so that enterprises would improve their technology innovation and get a new way to accomplish sustainable innovated development.

  16. Sustainability Actions in Higher Education

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-13

    This brochure details common sustainability actions taken by universities to reduce their energy consumption. Some of the most common actions include energy efficiency (existing building commissioning; lighting; heating, ventilation, and air conditioning upgrades; plug loads) and renewable energy (RE) (on-site or off-site solar deployment, RE procurement). We focus on the costs and benefits of energy efficiency measures and RE through the brochure while highlighting resources where readers can find more information.

  17. Upgrading nuclear safeguards in Kazakhstan

    International Nuclear Information System (INIS)

    Hunt, Maribeth; Murakami, Kenji

    2005-01-01

    When the Soviet Union collapsed in December 1991, Kazakhstan inherited 1,410 nuclear warheads. Within three years, by 1994, Kazakhstan had formally acceded to the Nuclear Non-Proliferation Treaty (NPT) and transferred its last nuclear warhead to Russia in April 1995. Its NPT safeguards agreement with the IAEA came into force in 1994 and all facilities are under safeguards. In February 2004 Kazakhstan signed the Additional Protocol to its IAEA safeguards agreement, though this not yet in force. Kazakhstan played a key role during the Soviet era as a supplier and processor of uranium. The BN-350 fast reactor at Aktau (formerly Shevchenko), on the shore of the Caspian Sea, successfully produced up to 135 MWe of electricity and 80,000 m3/day of potable water over some 27 years until it was closed down in mid-1999. The IAEA being involved in upgrading the nuclear material accountancy and control systems of all Member States requested, Japan and Sweden to conduct independent evaluations at the Kazakhstan Atomic Energy Committee (KAEC), and specifically at the Ulba Metallurgical Plant (UMP) and identified areas that could be improved with respect to nuclear material accountancy and control. In June 2003 the Agency, with four Member States and the European Union, undertook a programme to upgrade the nuclear accountancy and control systems within Kazakhstan with special emphasis on the UMP in Ust-Kamenogorsk in northeast Kazakhstan. The current IAEA programme is focused on upgrading hardware and software systems and the training of personnel in Kazakhstan. Due to the complexity of the facility, special emphasis is on training personnel and upgrading systems at the UMP. At the UMP the focus is on reducing the uncertainty in the hold-up (material which cannot be cleaned out) in the process lines, better determining the amount of nuclear material that is released from the facility as waste or retained at the facility as waste, increasing the ability of the facility to more

  18. Paloma co-op rehabilitation case study examining the challenges to energy upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Legge, C.; Schwartz, J. [JRS Enginerring LTd., Burnaby, (Canada)

    2010-07-01

    Paloma Cooperative consists of two wood-frame multi-unit residential buildings located in the Commercial Drive area of Vancouver, British Columbia. In 2006, investigations showed that the balconies were severely deteriorated due to water ingress. The complex was deemed to have suffered from a premature building failure. A complete building envelope remediation was necessary. This paper presented the challenges of incorporating energy efficient and sustainable design upgrades during a rehabilitation project, using the Paloma Cooperative as a case study. The various design options, the technical limitations, the financial analysis, the modelling assumptions and the involvement of third party lenders were presented. Initial air-leakage rates were measured and an energy modeling was completed using RETScreen software. Three scenarios were modeled to determine what effect different energy upgrades would have on the energy savings. This paper showed that cost was the biggest challenge faced by the Paloma Cooperative energy upgrade.

  19. The Upgrade to Hybrid Incubators in China

    DEFF Research Database (Denmark)

    Hu, Yimei; Gao, Yuchen

    countries and emerging economics. Based on a single in-depth case-study of Tuspark Incubator, this study explores key factors and specific ways for the upgrade to hybrid incubators in the context of China. By using categorical analysis, three factors, i.e. incubation subdivision, intermediary platform......, and proactive approach, are found to be essential for a formerly government-sponsored TBI’s upgrading. The result of this study also provides new insights and several implications for incubator managers and policy makers in emerging economies. In addition, whether the key factors can be used in upgrade of other...... TBIs in China requires further study....

  20. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  1. LHCb PID Upgrade Technical Design Report

    CERN Document Server

    LHCb Collaboration

    2013-01-01

    The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

  2. The MAST data acquisition upgrade

    International Nuclear Information System (INIS)

    McArdle, G.J.; Shibaev, Sergei; Storrs, John; Thomas-Davies, Nigel; Stephen, Robert

    2010-01-01

    A programme has begun on MAST to replace its ageing CAMAC and VME based data acquisition systems with new modern hardware which, together with several improvements in the supporting infrastructure, will provide support for faster data acquisition rates, longer-pulse operation, faster data access and higher reliability. The main principle of the upgrade was to use commercial off-the-shelf (COTS) hardware and well-established standards wherever possible. CompactPCI or PXI was chosen as the digitiser form factor to replace CAMAC/VME, and Ethernet would be used as the means to access all devices. The modular architecture of the MAST data acquisition software framework has helped to minimise the integration effort required to phase in new subsystems and/or new technologies whilst continuing to use the old hardware in other systems. The software framework was updated to allow more versatile use of the network-attached data acquisition devices. The new data acquisition devices had multiple connector types, which created difficulties with the cable interfacing. To resolve this and provide support for easy substitution, a standard connector interface was chosen, based on the most common connector type and pin-out already in use, and several cable assemblies were produced to connect the proprietary interface of the digitiser to the standard interface block. The in-house IDA-3 data storage format is unable to accommodate the larger file sizes and is increasingly difficult to maintain, so it is to be gradually phased out. The NetCDF-4/HDF5 data standard is being adopted as its replacement, thus reducing in-house maintenance whilst providing a data format that is more accessible to the Fusion community. Several other infrastructure upgrades were necessitated by the anticipated increase in data traffic and volume including the Central Timing System, the MAST Ethernet infrastructure and servers for front-end data processing, data storage and data access management. These

  3. Upgraded RECOVER system - CASDAC system

    International Nuclear Information System (INIS)

    Yamamoto, Yoichi; Koyama, Kinji

    1992-03-01

    The CASDAC (Containment And Surveillance Data Authenticated Communication) system has been developed by JAERI for nuclear safeguards and physical protection of nuclear material. This system was designed and constructed as an upgraded RECOVER system, design concept of which was based on the original RECOVER system and also the TRANSEAVER system. Both of them were developed several years ago as a remote monitoring system for continual verification of security and safeguards status of nuclear material. The system consists of two subsystems, one of them is a Grand Command Center (GCC) subsystem and the other is a facility subsystem. Communication between the two subsystems is controlled through the international telephone line network. Therefore all communication data are encrypted to prevent access by an unauthorized person who may intend to make a falsification, or tapping. The facility subsystem has an appropriate measure that ensure data security and reliable operation under unattended mode of operator. The software of this system is designed so as to be easily used in other different types of computers. This report describes the outline of the CASDAC system and the results of its performance test. This work has been carried out in the framework of Japan Support Programme for Agency Safeguards (JASPAS) as a project, JA-1. (author)

  4. ETA-II accelerator upgrades

    International Nuclear Information System (INIS)

    Nilson, D.G.; Deadrick, F.J.; Hibbs, S.M.; Sampayan, S.E.; Petersen, D.E.

    1991-09-01

    We discuss recent improvements to the ETA-II linear induction electron accelerator. The accelerator's cells have been carefully reconditioned to raise the maximum accelerating gap voltage from approximately 100 kV to 125 kV. Insulators of Rexolite plastic in a new ''zero-gap'' arrangement replaced the alumina originals after several alternative materials were investigated. A new multi-cable current feed system will be used to eliminate pulse reflection interactions encountered in earlier experiments. Improved alignment fixtures have been installed to help minimize beam perturbation due to poorly aligned intercell magnets between 10-cell groups. A stretched wire alignment technique (SWAT) has been utilized to enhance overall magnetic alignment, and to characterize irreducible alignment errors. These changes are in conjunction with an expansion of the accelerator from a 20-cell to a 60-cell configuration. When completed, the upgraded accelerator is expected to deliver 2.5 kA of electron beam current at 7.5 MeV in bursts of up to fifty 70-ns pulses at a 5-kHz repetition rate. A 5.5-meter-long wiggler will convert the energy into 3-GW microwave pulses at 140 GHz for plasma heating experiments in the Microwave Tokamak Experiment (MTX)

  5. Human-machine interface upgrade

    International Nuclear Information System (INIS)

    Kropik, M.; Matejka, K.; Sklenka, L.; Chab, V.

    2002-01-01

    The article describes a new human-machine interface that was installed at the VR-1 training reactor. The human-machine interface upgrade was completed in the summer 2001. The interface was designed with respect to functional, ergonomic and aesthetic requirements. The interface is based on a personal computer equipped with two displays. One display enables alphanumeric communication between the reactor operator and the nuclear reactor I and C. The second display is a graphical one. It presents the status of the reactor, principal parameters (as power, period), control rods positions, course of the reactor power. Furthermore, it is possible to set parameters, to show the active core configuration, to perform reactivity calculations, etc. The software for the new human-machine interface was produced with the InTouch developing tool of the Wonder-Ware Company. It is possible to switch the language of the interface between Czech and English because of many foreign students and visitors to the reactor. Microcomputer based communication units with proper software were developed to connect the new human-machine interface with the present reactor I and C. The new human-machine interface at the VR-1 training reactor improves the comfort and safety of the reactor utilisation, facilitates experiments and training, and provides better support for foreign visitors. (orig.)

  6. Disruption studies on ASDEX upgrade

    International Nuclear Information System (INIS)

    Pautasso, G.; Egorov, S.; Finken, K.H.

    2003-01-01

    Disruptions generate large thermal and mechanical stresses on the tokamak components and are occasionally responsible for damages to the machine. For a future reactor disruptions have a significant impact on the design since all loading conditions must be analyzed in accordance with stricter design criteria (due to safety or difficult maintenance). Therefore the uncertainties affecting the predicted stresses must be reduced as much as possible with a more comprehensive set of measurements and analyses in this generation of experimental machines, and avoidance/predictive methods must be developed further. Disruption studies on ASDEX Upgrade are focused on these subjects, namely on: (1) understanding the physical mechanisms leading to this phenomenon in order to learn to avoid it or to predict its occurrence and to mitigate its effects; (2) analyzing the effects of disruptions on the machine to determine the functional dependence of the thermal and mechanical loads upon the discharge parameters. This allows, firstly, to dimension or reinforce the machine components to withstand these loads and, secondly, to extrapolate them to tokamaks still in the design phase; (3) learning to mitigate the consequence of disruptions, i.e. thermal loads, mechanical forces and runaways with injection of impurity pellets or gas. This paper is focused on most recent results concerning points, i.e. on the analysis of the degree of asymmetry of the forces and on the use of impurity puff for mitigation

  7. Regime identification in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Giannone, L; Sips, A C C; Kardaun, O; Spreitler, F; Suttrop, W

    2004-01-01

    The ability to recognize the transition from the L-mode to the H-mode or from the H-mode to the improved H-mode reliably from a conveniently small number of measurements in real time is of increasing importance for machine control. Discriminant analysis has been applied to regime identification of plasma discharges in the ASDEX Upgrade tokamak. An observation consists of a set of plasma parameters averaged over a time slice in a discharge. The data set consists of all observations over different discharges and time slices. Discriminant analysis yields coefficients allowing the classification of a new observation. The results of a frequentist and a formal Bayesian approach to discriminant analysis are compared. With five plasma variables, a failure rate of 1.3% for predicting the L-mode and the H-mode confinement regime was achieved. With five plasma variables, a failure rate of 5.3% for predicting the H-mode and the improved H-mode confinement regime was achieved. The coefficients derived by discriminant analysis have been applied subsequently to discharges to illustrate the operation of regime identification in a real time control system

  8. Disruption studies in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Pautasso, G.

    2002-01-01

    Disruption generate large thermal and mechanical stresses on the tokamak components. For a future reactor disruptions have a significant impact on the design since all loading conditions must be analyzed in accordance with stricter design criteria (due to safety or difficult maintenance). Therefore the uncertainties affecting the predicted stresses must be reduced as much as possible with a more comprehensive set of measurements and analyses in this generation of experimental machines, and avoidance/ predictive methods must be developed further. The study of disruptions on ASDEX Upgrade is focused on these subjects, namely on: (1) understanding the physical mechanisms leading to this phenomenon and learning to avoid it or to predict its occurrence (with neural networks, for example) and to mitigate its effects; (2) analyzing the effects of disruptions on the machine to determine the functional dependence of the thermal and mechanical loads upon the discharge parameters. This allows to dimension or reinforce the machine components to withstand these loads and to extrapolate them to tokamaks still in the design phase; (3) learning to mitigate the consequence of disruptions. (author)

  9. Upgrading of PWR plant simulators

    International Nuclear Information System (INIS)

    Wada, Tomonori; Sasaki, Kazunori; Nakaishi, Hirokazu.

    1989-01-01

    For the education and training of operators in electric power plants, simulators have been employed, and it is well known that their effect is great. There are operation training simulators which simulate the dynamic characteristics of plants and all the machinery and equipment that operators handle, and train the procedure of restoration at the time of abnormality in plants, education simulators which can analyze the dynamic characteristics of plants efficiently in a short time, and offer information by visualizing phenomena with three-dimensional display and others so as to be easily understandable, and forecast simulators which do the analysis forecasting plant behavior at the time of abnormality in plants, and investigate the necessity of the guide for operation procedure and the countermeasures at the time of emergency. In this explanation, the upgrading of operation training simulators which have been put already in training is discussed. The constitution of simulator system and the instructor function, the outline of PWR plant simulation models comprising thermal flow model, pump model, leak model and so on, the techniques of increasing simulator speed, and the example of analysis using the NUPAC code are reported. (K.I.)

  10. Grassland Sustainability

    Science.gov (United States)

    Deborah U. Potter; Paulette L. Ford

    2004-01-01

    In this chapter we discuss grassland sustainability in the Southwest, grassland management for sustainability, national and local criteria and indicators of sustainable grassland ecosystems, and monitoring for sustainability at various scales. Ecological sustainability is defined as: [T]he maintenance or restoration of the composition, structure, and processes of...

  11. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  12. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  13. Safety upgrades of NPPs in Slovakia

    International Nuclear Information System (INIS)

    Ziakova, M.

    2013-01-01

    In this presentation Mrs. Marta Ziakova (Chairperson od Nuclear Regulatory Authority of the Slovak Republic) deals with the safety upgrades of nuclear power plants and radioactive wastes technologies in the Slovak Republic. Safety improvement activities are reviewed.

  14. Upgrading Lebanese Economic Analytical Capacity | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Lebanon needs to upgrade its analytical capacity within key economic policy ... in contemporary approaches to current policy issues such as privatization, fiscal policy, ... IDRC “unpacks women's empowerment” at McGill University Conference.

  15. Backbone upgrades and DEC equipment replacement

    Science.gov (United States)

    Vancamp, Warren

    1991-01-01

    The NASA Science Internet (NSI) dual protocol backbone is outlined. It includes DECnet link upgrades to match TCP/IP link performance. It also includes the integration of backbone resources and central management. The phase 1 transition process is outlined.

  16. System and process for upgrading hydrocarbons

    Science.gov (United States)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  17. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  18. Initial performance of upgraded Tevatron cryogenic systems

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab began operating a re-designed satellite refrigerator systems in November 1993. Upgrades were installed to operate the Tevatron at a magnet temperature of 3.5 K, approximately 1K lower than the original design. Refrigerator upgrades included new valve boxes, larger reciprocating expanders, the installation of cold vapor compressors, new sub-atmospheric instrumentation and an entirely new distributed controls system. Cryogenic system reliability data for Colliding Physics Run 1B is presented emphasizing a failure analysis for each aspect of the upgrade. Comparison to data for Colliding Physics Run 1A (previous to upgrade) is presented to show the impact of a major system overhaul. New operational problems and their solutions are presented in detail

  19. Upgrading of solid biofuels and feedstock quality

    Energy Technology Data Exchange (ETDEWEB)

    Burvall, Jan [Swedish Univ. of Agricultural Sciences, Umeaa (Sweden). Dept. of Agricultural Research for Northern Sweden

    1998-06-01

    This paper treats upgrading of biomass to pellets, briquettes and powder and the quality needed of the initial feedstock. The main raw materials are wood and reed canary grass (Phalaris arundinacea L.) 5 refs, 6 figs, 2 tabs

  20. Biogas Upgrading and Waste-to-Energy | Bioenergy | NREL

    Science.gov (United States)

    Biogas Upgrading and Waste-to-Energy Biogas Upgrading and Waste-to-Energy NREL's waste-to-energy research and development required for upgrading biogas to fuels and high-value co-products. Featured (2014) Biogas Potential in the United States, NREL Fact Sheet (2013) View all NREL biogas upgrading and

  1. Get a winning Oracle upgrade session using the quarterback approach

    Science.gov (United States)

    Anderson, G.

    2002-01-01

    Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

  2. Advantages of viscodampers for NPPs upgrading

    International Nuclear Information System (INIS)

    Reinsch, K.H.; Schwahn, K.J.; Podrouzek, J.

    1993-01-01

    Viscodampers GERB are the ideal components for seismic upgrading of flexible pipework systems of the existing operating NPPs, of WWER-440 type, namely in primary reactor part. There are cheap, maintenance-free, simple and their installation minimizes the support forces to the structures. The quoted attests are enclosed in this paper. The references for application on Bohunice NPP upgrading are positive, and they are used in Mochovce and Temelin NPP as well

  3. MAPS development for the ALICE ITS upgrade

    OpenAIRE

    Yang, P; Aglieri, G; Cavicchioli, C; Chalmet, P L; Chanlek, N; Collu, A; Gao, C; Hillemanns, H; Junique, A; Kofarago, M; Keil, M; Kugathasan, T; Kim, D; Kim, J; Lattuca, A

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging senso...

  4. High Flux Isotope Reactor power upgrade status

    International Nuclear Information System (INIS)

    Rothrock, R.B.; Hale, R.E.; Cheverton, R.D.

    1997-01-01

    A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions

  5. Upgrades of the ATLAS trigger system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2018-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  6. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  7. Hydrogen alternatives for a regional upgrader

    International Nuclear Information System (INIS)

    Bailey, R.T.; Padamsey, R.

    1991-01-01

    For a proposed regional upgrader in Alberta, hydrogen will be needed to upgrade the bitumen and heavy oil to be processed by that facility. The upgrader will rely on high conversion hydrocracking which consumes 3.4 wt % hydrogen to produce a 106% volume yield of high quality synthetic crude. The costs of producing hydrogen via steam reforming of methane, partial oxidation of coal or upgrading residues, and electrolysis are compared, showing that steam reforming is the cheapest. However, an even cheaper source of hydrogen is available in the Edmonton and Fort Saskatchewan area as byproducts from petrochemical plants. An economic analysis is presented of a proposed scheme to capture, purify, compress, and transfer hydrogen from one or two such plants to a nearby regional upgrader. The two plants could supply a total of 126.6 million ft 3 /d of hydrogen at a total installed capital cost of about half of that of a steam reforming plant of equivalent size. When operating costs are added (including the cost of replacing the hydrogen, currently used as fuel at the two plants, with natural gas), the total cost of hydrogen is substantially less than the costs for a hydrogen plant within the upgrader. 3 refs., 5 figs., 4 tabs

  8. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  9. IPNS upgrade: A feasibility study

    International Nuclear Information System (INIS)

    1995-04-01

    Many of Argonne National Laboratory's (ANL's) scientific staff members were very active in R ampersand D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R ampersand D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL's Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately

  10. The Advanced Light Source Upgrade

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2003-01-01

    The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented

  11. Design upgrading on Ignitor Machine

    International Nuclear Information System (INIS)

    Cucchiaro, A.; Coletti, A.; Bianchi, A.

    2006-01-01

    Ignitor is a high field compact machine conceived to achieve ignition in D-T plasma. The upgraded design of the Plasma Chamber (PC) and of the First Wall (FW) system consider the updated scenarios for IGNITOR vertical plasma disruption (VDE). The electromagnetic (EM) loads arising from halo currents and net horizontal force with the proper toroidal distribution have been envisaged. The dynamic elastic-plastic structural analysis of the PC has brought to a tayloring of the wall thickness such to reduce the displacements within the clearance with toroidal coil. A detailed 3D finite elements model has been developed in order to evaluate the electromagnetic loads on FW. The thermal loads arisen from plasma heat loads (peak value 1.8 MW/m 2 ) have been also considered. In any case the maximum calculated stresses are within the allowable limits. The relevant 3D virtual mockup software simulates the inside of the PC including the entire boom with end-effector. This allowed for the analysis of the boom kinematics to cover all positions with the various end-effectors to assess the Remote Handling task operations. The structural analysis of the IGNITOR machine Load Assembly has been performed taking into account the friction coefficients between the significant components. The non linear analysis takes into account for both the in-plane and the out-of-plane loads. The vertical plasma disruption conditions (VDE) result in bigger out-of-plane loads than the normal operating conditions. Keys of proper dimensions between the 30 o extension C-Clamps modules was adopted to assure structural stability. As far as the interlaminar shear stresses on toroidal field coils are concerned, the related safety factors are decreased respect to the normal operating conditions, but remaining around 2. (author)

  12. IPNS upgrade: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  13. The ASDEX Upgrade Parameter Server

    Energy Technology Data Exchange (ETDEWEB)

    Neu, Gregor, E-mail: gregor.neu@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Gräter, Alex [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany); Lüddecke, Klaus [Unlimited Computer Systems, Seeshaupter Str. 15, 82393 Iffeldorf (Germany); Rapson, Christopher J.; Raupp, Gerhard; Treutterer, Wolfgang; Zasche, Dietrich; Zehetbauer, Thomas [Max-Planck-Institut für Plasmaphysik, Boltzmannstr. 2, 85748 Garching (Germany)

    2015-10-15

    Highlights: • We describe our main tool in the plasma control configuration process. • Parameter access and computation are configurable with XML files. • Simple implementation of in situ tests by rerouting requests to test data. • Pulse specific overriding of parameters. - Abstract: Concepts for the configuration of plant systems and plasma control of modern devices such as ITER and W7-X are based on global data structures, or “pulse schedules” or “experiment programs”, which specify all physics characteristics (waveforms for controlled actuators and plasma quantities) and all technical characteristics of the plant systems (diagnostics and actuators operation settings) for a planned pulse. At ASDEX Upgrade we use different approach. We observed that the physics characteristics driving the discharge control system (DCS) are frequently modified on a pulse-to-pulse basis. Plant system operation, however, relies on technical standard settings, or “basic configurations” to provide guaranteed resources or services, which evolve according to longer term session or campaign operation schedules. This is why AUG manages technical configuration items separately from physics items. Consistent computation of the DCS configuration requires access to all this physics and technical data, which include the discharge programme (DP), settings of actuator systems and real-time diagnostics, the current system state and a database of static parameters. A Parameter Server provides a unified view on all these parameter sets and acts as the central point of access. We describe the functionality and architecture of the Parameter Server and its embedding into the control environment.

  14. Green technologies for the environmental upgrading of infrastructures

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2013-05-01

    Full Text Available Over the last few decades, the globalization phenomenon has determined the exponential development - from an economic, cultural and political standpoint - of traffic flows, the number of means and infrastructures involved in communication and exchange. At the same time, these represent one of the most complicated environmental issues of contemporary times, but perhaps also one of the most outstanding opportunities for setting up processes aimed at upgrading the territory and its constructions, towards environmental regeneration and social reorganization. These, in turn, would produce and spread (as in some already established examples of infrastructure upgrading innovative and more sustainable forms of urban lifestyles. The present contribution aims at illustrating the former, beginning with research and experiments involving the development of eco-friendly meta-design models for the correct employment of “green technologies” in: meta-project research for small mobility facilities; expansion and redevelopment works for the Stazione Termini; experiments in design for some energy-efficient underground metro stops in Rome.

  15. The Phase II Upgrade of the ATLAS Calorimeter

    CERN Document Server

    Tartarelli, Giuseppe Francesco; The ATLAS collaboration

    2017-01-01

    This presentation will show the status of the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC). For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 1034 cm−2 s−1 and the average pile-up up to 200 interactions per bunch crossing. The Liquid Argon (LAr) calorimeter electronics will need to be replaced to cope with these challenging conditions: the expected radiation doses will indeed exceed the qualification range of the current readout system, and the upgraded trigger system will require much longer data storage in the electronics (up to 60 us), that the current system cannot sustain. The status of the R&D of the low-power ASICs (pre-amplifier, shaper, ADC, serializer and transmitters) and of the readout electronics design will be discussed. Moreover, a High Granularity Timing Detector (HGTD) is proposed to be added in front of the LAr calorimeters in the end-cap region (2.4 <|eta|< 4.2) for pile-up mitigation a...

  16. Microbial electrochemical separation of CO2 for biogas upgrading.

    Science.gov (United States)

    Kokkoli, Argyro; Zhang, Yifeng; Angelidaki, Irini

    2018-01-01

    Biogas upgrading to natural gas quality has been under focus the recent years for increasing the utilization potential of biogas. Conventional methods for CO 2 removal are expensive and have environmental challenges, such as increased emissions of methane in the atmosphere with serious greenhouse impact. In this study, an innovative microbial electrochemical separation cell (MESC) was developed to in-situ separate and regenerate CO 2 via alkali and acid regeneration. The MESC was tested under different applied voltages, inlet biogas rates and electrolyte concentrations. Pure biomethane was obtained at 1.2V, inlet biogas rate of 0.088mL/h/mL reactor and NaCl concentration of 100mM at a 5-day operation. Meanwhile, the organic matter of the domestic wastewater in the anode was almost completely removed at the end. The study demonstrated a new sustainable way to simultaneously upgrade biogas and treat wastewater which can be used as proof of concept for further investigation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Sustainable Food & Sustainable Economics

    OpenAIRE

    Alvarez, Mavis Dora

    2012-01-01

    Cuba today is immersed in a very intense process of perfecting its agricultural production structures with the goal of making them more efficient and sustainable in their economic administration and in their social and environmental management. Agricultural cooperatives in Cuba have the responsibility of producing on 73% of the country's farmland. Their contributions are decisive to developing agricultural production and to ensuring more and better food for the population, in addition to redu...

  18. Directional liquefaction of biomass for phenolic compounds and in situ hydrodeoxygenation upgrading of phenolics using bifunctional catalysts

    Science.gov (United States)

    Junfeng Feng; Chung-yun Hse; Kui Wang; Zhongzhi Yang; Jianchun Jiang; Junming Xu

    2017-01-01

    Phenolic compounds derived from biomass are important feedstocks for the sustainable production of hydrocarbon biofuels. Hydrodeoxygenation is an effective process to remove oxygen-containing functionalities in phenolic compounds. This paper reported a simple method for producing hydrocarbons by liquefying biomass and upgrading liquefied products. Three phenolic...

  19. Overview of ASDEX Upgrade results

    Science.gov (United States)

    A. Kallenbachthe ASDEX Upgrade Team; the EUROfusion MST1 Team

    2017-10-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were designed for a reduction of tungsten release during ICRF operation. As predicted, a factor two reduction on the ICRF-induced W plasma content could be achieved by the reduction of the sheath voltage at the antenna limiters via the compensation of the image currents of the central and side straps in the antenna frame. There are two main operational scenario lines in AUG. Experiments with low collisionality, which comprise current drive, ELM mitigation/suppression and fast ion physics, are mainly done with freshly boronized walls to reduce the tungsten influx at these high edge temperature conditions. Full ELM suppression and non-inductive operation up to a plasma current of {{I}\\text{p}}=0.8 MA could be obtained at low plasma density. Plasma exhaust is studied under conditions of high neutral divertor pressure and separatrix electron density, where a fresh boronization is not required. Substantial progress could be achieved for the understanding of the confinement degradation by strong D puffing and the improvement with nitrogen or carbon seeding. Inward/outward shifts of the electron density profile relative to the temperature profile effect the edge stability via the pressure profile changes and lead to improved/decreased pedestal performance. Seeding and D gas puffing are found to effect the core fueling via changes in a region of high density on the high field side (HFSHD). The integration of all above mentioned operational scenarios will be feasible and naturally obtained in a large device where the edge is more opaque for neutrals and higher plasma temperatures provide a lower collisionality. The combination of exhaust control with pellet fueling has been successfully

  20. OPERATIONAL EXPERIENCE: UPGRADED MPC AND A SYSTEMS FOR THE RADIOCHEMICAL PLANT OF THE SIBERIAN CHEMICAL COMBINE

    International Nuclear Information System (INIS)

    RODRIGUEZ, C.; GOLOSKOKOV, I.; FISHBONE, L.; GOODEY, K.; LOOMIS, M.; CRAIN, B. JR.; LARSEN, R.

    2003-01-01

    The success of reducing the risk of nuclear proliferation through physical protection and material control/accounting systems depends upon the development of an effective design that includes consideration of the objectives of the systems and the resources available to implement the design. Included among the objectives of the design are facility characterization, definition of threat, and identification of targets. When considering resources, the designer must consider funds available, rapid low-cost elements, technology elements, human resources, and the availability of resources to sustain operation of the end system. The Siberian Chemical Combine (SCC) is a multi-function nuclear facility located in the Tomsk region of Siberia, Russia. Beginning in 1996, SCC joined with the United States Department of Energy (US/DOE) Material Protection, Control, and Accounting (MPC and A) Program to develop and implement MPC and A upgrades for the Radiochemical, Chemical Metallurgical, Conversion, Uranium Enrichment, and Reactor Plants of the SCC. At the Radiochemical Plant the MPC and A design and implementation process has been largely completed for the Plutonium Storage Facility and related areas of the Radiochemical Plant. Design and implementation of upgrades for the Radiochemical Plant include rapid physical protection upgrades such as bricking up of doors and windows, and installation of security-hardened doors. Rapid material control and accounting upgrades include installation of modern balances and bar code equipment. Comprehensive MPC and A upgrades include the installation of access controls to sensitive areas of the Plant, alarm communication and display (AC and D) systems to detect and annunciate alarm conditions, closed circuit (CCTV) systems to assess alarm conditions, central and secondary alarm station upgrades that enable security forces to assess and respond to alarm conditions, material control and accounting upgrades that include upgraded physical

  1. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  2. Upgrading Probability via Fractions of Events

    Directory of Open Access Journals (Sweden)

    Frič Roman

    2016-08-01

    Full Text Available The influence of “Grundbegriffe” by A. N. Kolmogorov (published in 1933 on education in the area of probability and its impact on research in stochastics cannot be overestimated. We would like to point out three aspects of the classical probability theory “calling for” an upgrade: (i classical random events are black-and-white (Boolean; (ii classical random variables do not model quantum phenomena; (iii basic maps (probability measures and observables { dual maps to random variables have very different “mathematical nature”. Accordingly, we propose an upgraded probability theory based on Łukasiewicz operations (multivalued logic on events, elementary category theory, and covering the classical probability theory as a special case. The upgrade can be compared to replacing calculations with integers by calculations with rational (and real numbers. Namely, to avoid the three objections, we embed the classical (Boolean random events (represented by the f0; 1g-valued indicator functions of sets into upgraded random events (represented by measurable {0; 1}-valued functions, the minimal domain of probability containing “fractions” of classical random events, and we upgrade the notions of probability measure and random variable.

  3. Developments towards the LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Cid Vidal, Xabier, E-mail: xabier.cid.vidal@cern.ch

    2016-09-21

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019–2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb{sup −1}. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign. - Highlights: • The VELO is the detector surrounding the LHCb collision point. • After its upgrade, the VELO will be capable of reading out at a rate of 40 MHz. • The detector will be composed of Si pixel sensors, read out by the VeloPix ASIC. • The irradiated prototype sensors for the VELO upgrade are currently being tested.

  4. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the luminosity will have increased 5-fold compared to the design luminosity (1034 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional luminosity increase by a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to u...

  5. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  6. Safety upgrades to the NRU research reactor

    International Nuclear Information System (INIS)

    DeAbreu, B.; Mark, J.M.; Mutterback, E.J.

    1998-01-01

    The NRU (National Research Universal) Reactor is a 135 MW thermal research facility located at Chalk River Laboratories, and is owned and operated by Atomic Energy of Canada Limited. One of the largest and most versatile research reactors in the world, it serves as the R and D workhorse for Canada's CANDU business while at the same time filling the role as one of the world's major producers of medical radioisotopes. AECL plans to extend operation of the NRU reactor to approximately the year 2005 when a new replacement, the Irradiation Research Facility (IRF) will be available. To achieve this, AECL has undertaken a program of safety reassessment and upgrades to enhance the level of safety consistent with modem requirements. An engineering assessment/inspection of critical systems, equipment and components was completed and seven major safety upgrades are being designed and installed. These upgrades will significantly reduce the reactor's vulnerability to common mode failures and external hazards, with particular emphasis on seismic protection. The scheduled completion date for the project is 1999 December at a cost approximately twice the annual operating cost. All work on the NRU upgrade project is planned and integrated into the regular operating cycles of the reactor; no major outages are anticipated. This paper describes the safety upgrades and discusses the technical and managerial challenges involved in extending the operating life of the NRU reactor. (author)

  7. Sustainable Campus Dining: How Campuses Are Targeting Sustainability and Engagement through Dining Services Initiatives

    Science.gov (United States)

    Berg, Celeste

    2013-01-01

    Sustainable food and dining is a popular topic on college and university campuses. Popular areas of focus include equipment upgrades in the kitchen, installation of campus or community gardens, and streamlining existing campus recycling operations, such as by converting campus vehicles to run on used vegetable oil from the dining hall. Research…

  8. Microbial biocatalyst developments to upgrade fossil fuels.

    Science.gov (United States)

    Kilbane, John J

    2006-06-01

    Steady increases in the average sulfur content of petroleum and stricter environmental regulations concerning the sulfur content have promoted studies of bioprocessing to upgrade fossil fuels. Bioprocesses can potentially provide a solution to the need for improved and expanded fuel upgrading worldwide, because bioprocesses for fuel upgrading do not require hydrogen and produce far less carbon dioxide than thermochemical processes. Recent advances have demonstrated that biodesulfurization is capable of removing sulfur from hydrotreated diesel to yield a product with an ultra-low sulfur concentration that meets current environmental regulations. However, the technology has not yet progressed beyond laboratory-scale testing, as more efficient biocatalysts are needed. Genetic studies to obtain improved biocatalysts for the selective removal of sulfur and nitrogen from petroleum provide the focus of current research efforts.

  9. Status of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.; Rutherford, B.

    1992-01-01

    Certain components of the ATLAS control system are two generations behind today's technology. It has been decided to upgrade the control system. in part, by replacing Digital Equipment Corporation (DEC) PDP-11 computers with present-day VAX technology. Two primary goals have been defined for the upgraded control system. The first of these goals is to keep additional ''in-house'' written software to a minimum, while providing the portability necessary to ensure the continued use of existing software. In an attempt to achieve this goal, commercially-available software has been utilized to provide a foundation for the final control-system configuration. The second goal is to develop the new control system, while not interfering with accelerator operations. This paper describes some of the motivation for upgrading the ATLAS control system, the basic features of the new control system, and the present status of the system's development

  10. LHC Interaction Region Upgrade Phase I

    CERN Document Server

    Ostojic, R

    2009-01-01

    The LHC is starting operation with beam in 2008. The primary goal of CERN and the LHC community is to ensure that the collider is operated efficiently, maximizing its physics reach, and to achieve the nominal performance in the shortest term. Since several years the community has been discussing the directions for upgrading the experiments, in particular ATLAS and CMS, the LHC machine and the CERN proton injector complex. A well substantiated and coherent scenario for the first phase of the upgrade, which is foreseen in 2013, is now approved by CERN Council. In this paper, we present the goals and the proposed conceptual solution for the Phase-I upgrade of the LHC interaction regions. This phase relies on the mature Nb-Ti superconducting magnet technology, with the target of increasing the luminosity by a factor of 2-3 with respect to the nominal luminosity of 1034 cm-2s-1, while maximising the use of the existing infrastructure.

  11. Energy upgrading measures improve also indoor climate

    DEFF Research Database (Denmark)

    Foldbjerg, Peter; Knudsen, Henrik Nellemose

    2014-01-01

    A new survey shows that the economy is what motivates Danish owners of single-family houses the most to start energy upgrading, and that improved indoor climate is also an important factor. After the upgrading, homeowners experience both improved economy and indoor climate. In a strategy...... to increase the number of homeowners who venture into a major energy upgrading of their house, the demonstrated positive side effects, more than energy savings, should be included in the communication to motivate homeowners. The barriers should be reduced by “taking the homeowners by the hand” and helping...... them to choose relevant energy-saving solutions as well as clarifying the financial consequences and opportunities....

  12. Thes - Website for Thermal Shields Upgrade Management

    CERN Document Server

    Micula, Adina

    2013-01-01

    There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.

  13. Tackling Chinese Upgrading through Experimentalism and Pragmatism

    DEFF Research Database (Denmark)

    Kirkegaard, Julia Kirch

    2017-01-01

    This paper examines the development of China’s wind turbine industry, shedding light on the Chinese mode of disruptive industrial upgrading through policy pragmatism and fragmented, experimental governance. Based on a historical analysis of China’s wind turbine industry, the paper highlights three...... distinct phases, which are all marked by their own inbuilt and potentially self-disruptive impasses and associated crises. In turn, these impasses have forced the Chinese government into radical and flexible interventions, which have spurred on Chinese companies to creatively find new ways to develop...... and upgrade. The paper illustrates the transformation of Sino–foreign relations by China’s non-linear upgrading approach, particularly during the Chinese wind power industry’s quality crisis, and its development model. It also discusses the implications this examination of China’s approach has...

  14. Use of ultrasound in petroleum residue upgradation

    Energy Technology Data Exchange (ETDEWEB)

    Sawarkar, A.N.; Pandit, A.B.; Samant, S.D.; Joshi, J.B. [Mumbai Univ., Mumbai (India). Inst. of Chemical Technology

    2009-06-15

    The importance of bottom-of-the barrel upgrading has increased in the current petroleum refining scenario because of the progressively heavier nature of crude oil. Heavy residues contain large concentrations of metals such as vanadium and nickel which foul catalysts and reduce the potential effect of residue fluidized catalytic cracking. This study showed that the cavitational energy induced by ultrasound be be successfully used to upgrade hydrocarbon mixtures. Conventional processes for the upgrading of residual feedstocks, such as thermal cracking and catalytic cracking, were carried out in the temperature range of 400-520 degrees C. Experiments were performed on 2 vacuum residues, Arabian mix vacuum residue (AMVR) and Bombay high vacuum residue (BHVR) and 1 Haldia asphalt (HA). These were subjected to acoustic cavitation for different reaction times from 15 to 120 minutes at ambient temperature and pressure. Two acoustic cavitation devices were compared, namely the ultrasonic bath and ultrasonic horn. In particular, this study compared the ability of these 2 devices to upgrade the petroleum residues to lighter, more value-added products. Different surfactants were used to examine the effect of ultrasound on upgrading the residue when emulsified in water. In order to better understand the reaction mechanism, a kinetic model was developed based on the constituents of the residue. The ultrasonic horn was found to be more effective in bringing about the upgrading than ultrasonic bath. The study also showed that the acoustic cavitation of the aqueous emulsified hydrocarbon mixture could reduce the asphaltenes content to a greater extent than the acoustic cavitation of non-emulsified hydrocarbon mixture. 20 refs., 11 tabs., 17 figs.

  15. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  16. Instrumentation and control doctrine for VVER upgrading

    International Nuclear Information System (INIS)

    Pernette, R.; Cucciniello, J.; Trebot, R.

    1997-01-01

    The main results are reported of analyses carried out on the WWER-400 and WWER-1000 series, and the reasons are summed up underlying the decision to establish a policy of WWER instrumentation and control upgrading. It is shown that such a policy forms a key stage in any upgrading project and contributes to the improvement of reactor safety at several levels: it helps to optimize the integration of safety requirements; it makes it easier to achieve a high level of automation and a better man-machine interaction; it should raise the culture of reactor safety. Four annexes demonstrate the factual fundamentals and structure of such a policy. (A.K.)

  17. Take control of upgrading to Snow Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Installing a major new version of Mac OS X should be exciting and fun, but without proper guidance you may find it nerve-wracking or even risk losing valuable files. Fortunately, many thousands of people have upgraded Mac OS X calmly and successfully with Joe Kissell's previous best-selling Take Control of Upgrading... titles. Joe's friendly, expert steps-developed over innumerable test installations-help you to avoid trouble, understand what's going on when you install Snow Leopard, and easily recover from problem

  18. Do we really need a collimator upgrade?

    International Nuclear Information System (INIS)

    Redaelli, S.

    2012-01-01

    Several improvements are foreseen for the LHC collimation system during the LS1 and beyond. The changes are matched to the required performance reach during the HL-LHC era. The scenarios for system upgrades are determined based on the present operational experience with the operation at 3.5 TeV, well about the beam stored energy regime of 100 MJ. The present upgrade strategy, and the uncertainties on the performance extrapolation to 7 TeV are presented. The collimation activities in LS1 are outlined and the possible works for LS2 and LS3 are presented. (author)

  19. The LANSCE RICE control system upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Oothoudt, Michael; Schaller, S. (Stuart); Bjorklund, E. A. (Eric A.); Burns, M. J. (Mary J.); Carr, G. (Gary); Carr, G. (Gary); Faucett, John Allen,; Hayden, D. J. (David J.); Lusk, M. D. (Matthew D.); Merl, R. B. (Robert B.); Potter, J. M. (Jerry M.); Reynolds, J. A. (Jerome A.); Romero, D. B. (Dolores B.); Shelley, F. E. (Fred E.)

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  20. The LANSCE RICE control system upgrade

    International Nuclear Information System (INIS)

    Oothoudt, Michael; Schaller, S.; Bjorklund, E.A.; Burns, M.J.; Carr, G.; Faucett, John Allen; Hayden, D.J.; Lusk, M.D.; Merl, R.B.; Potter, J.M.; Reynolds, J.A.; Romero, D.B.; Shelley, F.E.

    2003-01-01

    The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the non-timed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.

  1. CMS Calorimeter Trigger Phase I upgrade

    International Nuclear Information System (INIS)

    Klabbers, P; Gorski, T; Bachtis, M; Dasu, S; Fobes, R; Grothe, M; Ross, I; Smith, W H; Compton, K; Farmahini-Farahani, A; Gregerson, A; Seemuth, D; Schulte, M

    2012-01-01

    We present a design for the Phase-1 upgrade of the Compact Muon Solenoid (CMS) calorimeter trigger system composed of FPGAs and Multi-GBit/sec links that adhere to the μTCA crate Telecom standard. The upgrade calorimeter trigger will implement algorithms that create collections of isolated and non-isolated electromagnetic objects, isolated and non-isolated tau objects and jet objects. The algorithms are organized in several steps with progressive data reduction. These include a particle cluster finder that reconstructs overlapping clusters of 2x2 calorimeter towers and applies electron identification, a cluster overlap filter, particle isolation determination, jet reconstruction, particle separation and sorting.

  2. Sustainable Geophysical Observatory Networks

    Science.gov (United States)

    Willemann, R. J.; Lerner-Lam, A.; Aster, R.; Beck, S.; Ekstrom, G.; Nyblade, A.; Sandvol, E.

    2007-05-01

    Geophysical networks are defined not only by their technical specifications, but also by the characteristics and needs of the communities that use them. Growing populations supported by more elaborate urban infrastructure with its fine-grained socio-economic interdependencies and relying on global and regional connections for sustainability make new demands for natural hazard risk management. Taking advantage of advances in the underlying science to provide society with accurate risk assessments often requires higher fidelity measurements, entirely new types of observations, and an evolutionary sense of data products and information management. Engineering a high-tech system to address stakeholder needs is difficult, and designing for unpredictable developments requires an emphasis on adaptation. Thus, it is essential to promote formation of organizations or communities that can support evolution of a technological system, imagine new uses, and develop the societal relationships that sustain operations and provide capital for improvement. The owners must have a deep understanding of why the system works in particular ways and how to manage data products for the benefits of stakeholders. To be effective, community promotion must be sustained over a longer period of time than required to build a network and should be aimed at integrating the community into worldwide partnerships. Practices that can promote community formation if they are sustained include repeated training and scientific exchange workshops, extended visits by experts and staff at all levels to and from countries where networks are installed, mechanisms that make timely upgrades realistically possible, and routine exchange and wide dissemination of data in all directions. The combination of international research and educational collaborations, supported by open data exchange, with regionalized and specific assessments of local stakeholder needs and concerns, provides a sustainable model for

  3. Colorado River Sewer System Joint Venture to Upgrade Wastewater System

    Science.gov (United States)

    SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap

  4. Safety upgrading of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. It consist of next chapters: (1) Introductory speeches; (2) Nuclear power plant WWER 440; (3) Safety improvement; (4) Bohunice Nuclear power plants subsidiary; (5) Siemens; (6) REKON; (7) VUJE Trnava, Inc. - Engineering, Design and Research Organisation; (8) Album

  5. The Kyoto University tandem upgrading project

    International Nuclear Information System (INIS)

    Nakamura, Masanobu; Shimoura, Susumu; Takimoto, Kiyohiko; Sakaguchi, Harutaka; Kobayashi, Shinsaku

    1988-01-01

    A brief description on the Kyoto University tandem upgrading project. The project consists of replacing the old 5 MV tandem Van de Graaff by an 8UDH pelletron. The old pressure vessel and beam lines are used again without significant modification. The project is planned to be completed at the end of 1989. (orig.)

  6. Upgrade tracking with the UT Hits

    CERN Document Server

    Gandini, P; Wang, J

    2014-01-01

    The performance of the LHCb tracking system for the upgrade on long tracks is evaluated in terms of efficiency and ghost rate reduction for several different sets of requirements. We find that the efficiency is quite high and that the ghost rate reduction is substantial. We also describe the current algorithm for adding UT hits to the tracks.

  7. Social Upgrading in Developing Country Industrial Clusters

    DEFF Research Database (Denmark)

    Pyke, Frank; Lund-Thomsen, Peter

    2016-01-01

    In this article, we examine the role of social upgrading in developing country industrial clusters. We argue that while economic growth and productivity enhancement matter, social conditions within clusters are influenced by state monetary, fiscal, and labour policies and regulations, as well...

  8. Design of the PISCES-Upgrade facility

    International Nuclear Information System (INIS)

    Waganer, L.M.; Doerner, R.

    1994-01-01

    The PISCES-Upgrade facility is currently in the design and fabrication phases for the University of California. McDonnell Douglas is under contract to develop this experimental facility in order to enhance the capability for investigation of fusion materials erosion-redeposition and edge plasma behaviors. The advance in facility capability requires innovative design approaches and application of sophisticated analysis techniques

  9. Upgrades to the ISIS moderator configuration

    International Nuclear Information System (INIS)

    Taylor, A.D.

    1989-01-01

    The current ISIS moderator configuration, was designed in 1980 to provide a flexible set of beams for a hypothetical instrument suite. The use of fluid moderators at three different temperatures offering six faces to the instruments, has proved to be effective. In this paper we discuss an upgrade of these moderators in the light of the current and projected instrument configuration. (author)

  10. VUJE tasks and activities during gradual upgrading

    International Nuclear Information System (INIS)

    Ferenc, M.

    2001-01-01

    The paper describes the organization and management of the Gradual Upgrading of the Bohunice V1 NPP and the principle tasks and scope of activities provided by VUJE Trnava, Inc. It also describes the system of supplies and the system of quality assurance both in the consortium and in subcontractors. (author)

  11. Design features impacting mobile phone upgrading frequency

    NARCIS (Netherlands)

    Saaksjarvi, M.C.; Hellen, K.; Tuunanen, T.

    2014-01-01

    This study examines the impact of design on customer upgrading frequency, and differentiates between functional and aesthetic aspects of design. For the empirical study, we conducted an intercept survey in Beijing and Shanghai with Chinese consumers (n=170) in a retail mall setting. The survey’s

  12. The Phase-2 ATLAS ITk Pixel Upgrade

    CERN Document Server

    Rossi, Leonardo Paolo; The ATLAS collaboration

    2018-01-01

    The upgrade of the ATLAS experiment for the operation at the High Luminosity Large Hadron Collider requires a new and more performant inner tracker, the ITk. The innermost part of this tracker will be built using silicon pixel detectors. This paper describes the ITk pixel project, which, after few years of design and test e ort, is now defined in detail.

  13. Overview of the Calorimeter Readout Upgrades

    CERN Document Server

    Straessner, Arno; The ATLAS collaboration

    2018-01-01

    The ATLAS and CMS calorimeter electronics will be upgraded for the HL-LHC data taking phase to cope with higher event pile-up and to allow improved trigger strategies. This presentations gives an overview of the ongoing developments for the CMS barrel calorimeters and the ATLAS LAr and Tile calorimeters.

  14. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  15. Fermilab Linac Upgrade Conceptual Design: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1989-07-01

    The goal of the Tevatron Collider Upgrade program is to improve the Collider luminosity and the fixed-target intensity. The Linac portion of this project will increase the energy of the existing 200- MeV linac to 400 MeV in order to reduce beam emittance degradation in the Booster.

  16. Guidelines for upgrading of low volume roads

    CSIR Research Space (South Africa)

    Division of Roads

    1993-03-01

    Full Text Available The purpose of this manual is to provide guidelines on the upgrading of gravel low volume roads to roads and maintenance personnel of road authorities of all sizes. Low volume is, for the purpose of this document, defined to be less than 500...

  17. The CDF SVX II detector upgrade

    International Nuclear Information System (INIS)

    Skarha, J.E.

    1993-10-01

    The proposed CDF SVX II detector upgrade for secondary vertex detection during the Fermilab Tevatron Run II collider run is described. The general design and important features of this silicon vertex detector are presented. The CDF physics goals which are addressed by this detector are also given

  18. LHCb Vertex Locator Upgrade Work Report

    CERN Document Server

    Estrada, Michael

    2017-01-01

    As the LHCb prepares for the planned upgrade of its vertex locator, there is a great need for supporting work such as the design and testing of apparatus that will ensure the smooth implementation of new hardware and infrastructure. My work this summer consisted largely of tasks to support this process.

  19. ISOLDE Off-line Gas Leak Upgrade

    CERN Document Server

    Nielsen, Kristoffer Bested

    2017-01-01

    This study investigates gas injection system of the ISOLDE Off-line separator. A quadrupole mass spectrometer is used to analysis the composition of the gas. Based on these measurements a contamination of the injected gas is found and a system upgrade is purposed. Furthermore a calibration of the leak rate of the leak valve is made.

  20. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Lingemann, Joschka; Sakulin, Hannes; Jeitler, Manfred; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run 2 of the Large Hadron Collider pose new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run 1, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new microTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (GMT) which combines information from the muon trigger sub-systems and assigns the isolation variable. The upgraded GMT will be implemented using a Master Processor 7 card, built by Imperial College, that features a large Xilinx Virtex 7 FPGA. Up to 72 optical links at...

  1. Upgrading of TARN-II vacuum system

    International Nuclear Information System (INIS)

    Chida, K.; Arakaki, Y.; Yoshizawa, M.; Tomizawa, M.; Tanabe, T.; Katayama, I.

    1994-01-01

    Ion pumps and titanium getter pumps have been increased nearly twice in the TARN-II. The pumping speed per unit length is now improved up to 2/3 times that of TARN-I. An average vacuum pressure of 10 -11 Torr order has been achieved at beam time. Performance of the system after the upgrading is reported. (author)

  2. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  3. Operation status and upgrading of HIRFL

    International Nuclear Information System (INIS)

    Tang, J.Y.; Wang, Y.F.; Wei, B.W.

    2001-01-01

    The operation status and the undergoing upgrading at HIRFL machine are presented. The accelerated ion species with the machine have been expanding, including metallic ions and higher energy with the new ECR ion source. The upgrading of HIRFL as the pre-accelerator of CSR storage ring has been processing steadily. The new 14.5 GHz ECR ion source has been put in operation in early 1999. A full-superconducting ECR ion source of 18 GHz is under design. The manufacture of the new vacuum chamber for SFC is just finished and the installation is to be started. The construction of the new B1 buncher is nearly to be finished, and the off-line test and the installation will be started soon. Another two identical bunchers will be ordered after the test. The beam distribution system is under upgrading to make all experiment stations separate from the others and the time-sharing mode possible, and a new cancer-therapy station is also under construction. The other upgrading items include the yoke enlarging of SFC, beam diagnostics, computer control and beam distribution system

  4. T-Farm complex alarm upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J.B.

    1995-01-01

    The alarm and controls associated with the T, TX, and TY farms are located in the 242-T control room. The design data for replacement and upgrades of the alarm panels is in this document. This task was canceled previous to the 90% design review point.

  5. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Oreglia, M; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The main upgrade will occur for the High Luminosity LHC phase (phase 2) which is scheduled around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to use will be decided after extensive test beam studies. High speed optical links are used to read out all digitized data to the counting room. For the off-detector electronics a new back-end architecture is being developed, including the initial trigger processing and pipeline memories. A demonstrator prototype read-out for a slice of the ...

  6. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5x compared to the design luminosity (10^34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade is expected to happen around 2023. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 ...

  7. Upgrade of the CERN telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, maintenance work will be carried out on the CERN switching centre between 8.00 p.m. and 10.00 p.m. on Monday 9 October. Telephone services may be disrupted and possibly even interrupted during this time. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  8. Filtration engineering study to upgrade the ETF

    International Nuclear Information System (INIS)

    McDonald, F.N.N.

    1995-01-01

    Filtration technologies are evaluated which have potential to augment or upgrade the 200 Area Effluent Treatment Facility. The study was written in anticipation of treating future waste waters that have high fouling potentials. The Three ultrafilters judged to be capable of treating future waste waters are: hollow fiber, tubular, and centrifugal

  9. Safety upgrade at the Leningrad NPP

    International Nuclear Information System (INIS)

    Eperin, A.P.

    1996-01-01

    The LNPP was developed according to the standards of early 70's but, at the same time, during the whole period of operation, the Plant equipment, technological, automatic and control and protection systems were upgraded with regard to changing safety and reliability requirements. Main steps taken during the backfitting stage to improve the reliability and safety of LNPP equipment and systems are discussed

  10. CMS: Present status, limitations, and upgrade plans

    International Nuclear Information System (INIS)

    Cheung, H.W.K.

    2011-01-01

    An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R and D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

  11. Instrument hardware and software upgrades at IPNS

    International Nuclear Information System (INIS)

    Worlton, Thomas; Hammonds, John; Mikkelson, D.; Mikkelson, Ruth; Porter, Rodney; Tao, Julian; Chatterjee, Alok

    2006-01-01

    IPNS is in the process of upgrading their time-of-flight neutron scattering instruments with improved hardware and software. The hardware upgrades include replacing old VAX Qbus and Multibus-based data acquisition systems with new systems based on VXI and VME. Hardware upgrades also include expanded detector banks and new detector electronics. Old VAX Fortran-based data acquisition and analysis software is being replaced with new software as part of the ISAW project. ISAW is written in Java for ease of development and portability, and is now used routinely for data visualization, reduction, and analysis on all upgraded instruments. ISAW provides the ability to process and visualize the data from thousands of detector pixels, each having thousands of time channels. These operations can be done interactively through a familiar graphical user interface or automatically through simple scripts. Scripts and operators provided by end users are automatically included in the ISAW menu structure, along with those distributed with ISAW, when the application is started

  12. Bevalac injector final stage RF amplifier upgrades

    International Nuclear Information System (INIS)

    Howard, D.; Calvert, J.; Dwinell, R.; Lax, J.; Lindner, A.; Richter, R.; Ridgeway, W.

    1991-01-01

    With the assistance of the DOE In-house Energy Management Program, the Bevalac injector final stage RF amplifier systems have been successfully upgraded to reduce energy consumption and operating costs. This recently completed project removed the energy-inefficient plate voltage modulator circuits that were used in conjunction with the final stage RF amplifiers. Construction, design, and operating parameters are described in detail

  13. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  14. Possible neutral beam requirements for TFTR upgrades

    International Nuclear Information System (INIS)

    Prichard, B.A. Jr.; Little, R.; Post, D.E.; Schmidt, J.A.

    1977-01-01

    A discussion is provided of possible neutral beam requirements and constraints for a TFTR upgrade. The time scale is the early 80s and beams of 250 keV D 0 , probably using 65 ampere negative ion sources, existing power supplies and vacuum enclosures would be required

  15. Upgrade of GUI for linac control

    International Nuclear Information System (INIS)

    Oonuma, Tadahiro; Shibasaki, Yoshinobu

    1993-01-01

    We are now upgrading GUI(Graphical User Interface) of the control system at Tohoku Linac. This system uses Personal Computer (DECpc466D2LP-66MHz) and Visual Basic which makes coding GUI easy and simple. The first results of this system are presented. (author)

  16. Sustainable Marketing

    NARCIS (Netherlands)

    Dam, van Y.K.

    2017-01-01

    In this article, three different conceptions of sustainable marketing are discussed and compared. These different conceptions are referred to as social, green, and critical sustainable marketing. Social sustainable marketing follows the logic of demand-driven marketing management and places the

  17. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2011-08-01

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  18. Slum upgrading in developing countries: lessons from Ghana and ...

    African Journals Online (AJOL)

    The paper identifies common elements in the upgrading programmes in the literature. It assesses two slum upgrading projects from Ghana and Kenya to determine how the elements were factored into the projects' implementation. The article concludes that stakeholders involved in slum upgrading in Africa should consider ...

  19. Events as spaces for upgrading : Automotive events in Shanghai

    NARCIS (Netherlands)

    E. van Tuijl (Erwin); K. Dittrich (Koen)

    2015-01-01

    textabstractThis study contributes to the literature dealing with upgrading of the Chinese automotive industry by analysing the role of events in the upgrading process. By combining literature on temporary clusters with that of knowledge sourcing and upgrading, we investigate how firms use events

  20. Is your upgrade worth it? process mining can tell

    NARCIS (Netherlands)

    Genuchten, van M.J.I.M.; Mans, R.S.; Reijers, H.A.; Wismeijer, D.

    2014-01-01

    Software vendors typically release updates and upgrades of their software once or twice a year. Users are then faced with the question of whether the upgrade is worth the price and the trouble. The software industry doesn't provide much evidence that it's worthwhile to upgrade to new releases. The

  1. Is your upgrade worth it? Process mining can tell

    NARCIS (Netherlands)

    Genuchten, M.J.I.M.; Mans, R.S.; Reijers, H.A.; Wismeijer, D.

    2014-01-01

    Software vendors typically release updates and upgrades of their software once or twice a year. Users are then faced with the question of whether the upgrade is worth the price and the trouble. The software industry doesn't provide much evidence that it's worthwhile to upgrade to new releases. The

  2. Nuclear materials control and accountability criteria for upgrades measures

    Energy Technology Data Exchange (ETDEWEB)

    Erkkila, B.H.; Hatcher, C.R.

    1998-11-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

  3. Nuclear materials control and accountability criteria for upgrades measures

    International Nuclear Information System (INIS)

    Erkkila, B.H.; Hatcher, C.R.

    1998-01-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force

  4. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  5. Completion of the brightness upgrade of the ALS

    International Nuclear Information System (INIS)

    Steier, C; Madur, A; Bailey, B; Berg, K; Biocca, A; Black, A; Casey, P; Colomb, D; Gunion, B; Li, N; Marks, S; Nishimura, H; Pappas, C; Petermann, K; Portmann, G; Prestemon, S; Rawlins, A; Robin, D; Rossi, S; Scarvie, T

    2014-01-01

    The Advanced Light Source (ALS) at Berkeley Lab remains one of the brightest sources for soft x-rays worldwide. A multiyear upgrade of the ALS is underway, which includes new and replacement x-ray beamlines, a replacement of many of the original insertion devices and many upgrades to the accelerator. The accelerator upgrade that affects the ALS performance most directly is the ALS brightness upgrade [1], which reduces the horizontal emittance from 6.3 to 2.0 nm (2.5 nm effective). Magnets for this upgrade were installed in late 2012 and early 2013 followed by user operation with the reduced emittance.

  6. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sherry, T D; Kohlhorst, D P; Little, S K

    2011-12-01

    impacts to resources, including energy/fuel, water, waste, pesticides, and pollution generation; (8) Incorporate sustainable design principles into the design and construction of facility upgrades, new facilities, and infrastructure; and (9) Comply with federal and state regulations, executive orders, and DOE requirements. Y-12 is working to communicate its sustainment vision through procedural, engineering, operational, and management practices. The site will make informed decisions based on the application of the five Guiding Principles for HPSBs to the maximum extent possible.

  7. Hydrocarbon upgrading demonstration program (HUDP): an investment in the future of the oil sands

    Energy Technology Data Exchange (ETDEWEB)

    Du Plessis, Duke; Isaacs, Eddy [AI-EES (Canada); Hill, Rich; McPhee, Anne; Keesom, Bill; Arnold, Ed [Jacobs Consultancy (Canada)

    2011-07-01

    Alberta Innovates Energy and Environment Solutions (AIEES), the technology arm of the Alberta Government in terms of energy and the environment, has initiated the hydrocarbon upgrading demonstration program (HUDP). Since lighter products have a better market value, this program aims to develop technologies for upgrading heavy oil into light, transportable fuel. The program also aims to improve SAGD efficiency while reducing greenhouse gas emissions. To do so, the gaps between typical and ideal operations were identified and quantified, life cycle analyses were performed, current studies were reviewed and future issues and opportunities were assessed. With the HUDP program, AIEES is supporting the industry through investment and technology support to develop innovative technologies which will improve margins and the sustainability of oil sands operations.

  8. Preventing microbial growth on pall-rings when upgrading biogas using absorption with water wash

    Energy Technology Data Exchange (ETDEWEB)

    Haakansson, Anna

    2006-07-15

    For produced biogas to be usable as vehicle fuel it has to be upgraded to a higher energy content. This is accomplished by elevation of the methane concentration through removal of carbon dioxide. Absorption with water wash is the most common upgrading method used in Sweden today. The upgrading technique is based on the fact that carbon dioxide is more soluble in water than methane. Upgrading plants that utilises this method have problems with microbial growth in the system. This growth eventually leads to a stop in operation due to the gradually drop in upgrading capacity. The aim of this thesis were to evaluate the possibility to through some kind of water treatment maintain an acceptable level of growth or altogether prevent it in order to maintain an acceptable process capacity and thereby avoid the need to clean. Through collection of literature the implementation possibilities were evaluated with regard to efficiency, economic sustainability and if there would be a release of any harmful substances. In order to prevent the microbial growth in the columns the treatment should either focus on removing microorganisms or limit the accessible nutrients. For the single pass system it is concluded that the treatment should reduce the biofilm formation and be employed in an intermittent way. Among the evaluated treatments focusing on the reduction of microorganisms the addition of peracetic acid seems to be the most promising one. For the regenerating system the treatment method could focus on either one. As for the single pass system peracetic acid could be added to reduce the amount of microorganism. To reduce the amount of organic matter an advanced oxidation process could be deployed with the advantage that it also could remove the microorganisms.

  9. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  10. Sustainable Disruptions

    DEFF Research Database (Denmark)

    Friis, Silje Alberthe Kamille; Kjær, Lykke Bloch

    2016-01-01

    Since 2012 the Sustainable Disruptions (SD) project at the Laboratory for Sustainability at Design School Kolding (DK) has developed and tested a set of design thinking tools, specifically targeting the barriers to economically, socially, and environmentally sustainable business development....... The tools have been applied in practice in collaboration with 11 small and medium sized companies (SMEs). The study investigates these approaches to further understand how design thinking can contribute to sustainable transition in a business context. The study and the findings are relevant to organizations...... invested in the issue of sustainable business development, in particular the leaders and employees of SMEs, but also to design education seeking new ways to consciously handle and teach the complexity inherent in sustainable transformation. Findings indicate that the SD design thinking approach contributes...

  11. NPP Krsko Severe Accident Management Guidelines Upgrade

    International Nuclear Information System (INIS)

    Mihalina, Mario; Spalj, Srdjan; Glaser, Bruno; Jalovec, Robi; Jankovic, Gordan

    2014-01-01

    Nuclear Power Plant Krsko (NEK) has decided to take steps for upgrade of safety measures to prevent severe accidents, and to improve the means to successfully mitigate their consequences. The content of the program for the NEK Safety Upgrade is consistent with the nuclear industry response to Fukushima accident, which revealed many new insights into severe accidents. Therefore, new strategies and usage of new systems and components should be integrated into current NEK Severe Accident Management Guidelines (SAMG's). SAMG's are developed to arrest the progression of a core damage accident and to limit the extent of resulting releases of fission products. NEK new SAMG's revision major changes are made due to: replacement of Electrical Recombiners by Passive Autocatalytic Recombiners (PARs) and the installation of Passive Containment Filtered Vent System (PCFV); to handle a fuel damage situation in Spent Fuel Pool (SFP) and to assess risk of core damage situation during shutdown operation. (authors)

  12. LS1: electrical engineering upgrades and consolidation

    International Nuclear Information System (INIS)

    Duval, F.

    2012-01-01

    3 different types of activities are planned by the Engineering Department Electrical Engineering (EN-EL) Group for the first long shut down (LS1). First, the consolidation of EN-EL's ageing infrastructure elements. It is part of a 15- year programme aiming at increasing the reliability and availability of the power distribution network. Secondly, the maintenance of the accelerators infrastructure. In addition to the usual periodic operations and those delayed until LS1, the group will address more demanding activities like the replacement campaigns for irradiated cables and non-radiation resistant fibres as well as the removal of unused cables in particularly overcrowded areas. Thirdly, a vast amount of user copper and optical fibre cabling requests: EN-EL estimates that only 50% of LS1 requests are currently known. The main activities will be EN-EL's contributions to the R2E project, BE-BI upgrade projects, and the RF upgrade project in SPS BA3

  13. An Upgrade for the Advanced Light Source

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benedict; Hussain, Zahid; Kirz, Janos; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2004-01-01

    One of the first third-generation synchrotron light sources, the ALS, has been operating for almost a decade at Berkeley Lab, where experimenters have been exploiting its high brightness for forefront science. However, accelerator and insertion-device technology have significantly changed since the ALS was designed. As a result, the performance of the ALS is in danger of being eclipsed by that of newer, more advanced sources. The ALS upgrade that we are planning includes full-energy, top-off injection with higher storage-ring current and the replacement of five first-generation insertion devices with nine state-of-the art insertion devices and four new application-specific beamlines now being identified in a strategic planning process. The upgrade will help keep the ALS at the forefront of soft x-ray synchrotron light sources for the next two decades

  14. NSLS Control Monitor and its upgrade

    International Nuclear Information System (INIS)

    Ramamoorthy, S.; Smith, J.D.

    1993-01-01

    The NSLS Control Monitor is a real-time operating system designed for the microprocessor subsystems that control the machine hardware in the NSLS facility. Its major functions are to control the hardware in response to the commands from the host computers, monitor hardware status and report errors to the alarm handler. The software originally developed for the Multibus micros has been upgraded to run on the VME-based systems. The upgraded monitor provides ethernet communication with the new system and serial link with the old system. The dual link is the key feature for a smooth and nondisruptive transition at all levels of the control system. This paper describes the functions of the various modules of the monitor and future plans

  15. Cryomodule development for the CEBAF upgrade

    International Nuclear Information System (INIS)

    J. R. Delayen; L. R. Doolittle; E. Feldl; J. Hogan; J. Mammosser; V. Nguyen; H. L. Phillips; J. Preble; W. J. Scheider; D. X. Wang; M. Wiseman

    1999-01-01

    Long term plans for CEBAF at Jefferson Lab call for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule capable of providing more than three times the voltage of the original CEBAF cryomodule specification within the same length is under development. Development activities have been focused on critical areas thought to have maximum impact on the overall design. These have included the cavity structure, rf power coupling, cavity suspension, alignment, cavity tuning, and beamline interface. It has been found that all design and development areas are tightly coupled and can not be developed independently. Substantial progress has been made toward an integrated design for the Jefferson Lab Upgraded Cryomodule

  16. The ALICE Central Trigger Processor (CTP) upgrade

    International Nuclear Information System (INIS)

    Krivda, M.; Alexandre, D.; Barnby, L.S.; Evans, D.; Jones, P.G.; Jusko, A.; Lietava, R.; Baillie, O. Villalobos; Pospíšil, J.

    2016-01-01

    The ALICE Central Trigger Processor (CTP) at the CERN LHC has been upgraded for LHC Run 2, to improve the Transition Radiation Detector (TRD) data-taking efficiency and to improve the physics performance of ALICE. There is a new additional CTP interaction record sent using a new second Detector Data Link (DDL), a 2 GB DDR3 memory and an extension of functionality for classes. The CTP switch has been incorporated directly onto the new LM0 board. A design proposal for an ALICE CTP upgrade for LHC Run 3 is also presented. Part of the development is a low latency high bandwidth interface whose purpose is to minimize an overall trigger latency

  17. LHCb: Upgrade of the LHCb calorimeter electronics

    CERN Multimedia

    Mauricio Ferre, J

    2013-01-01

    The LHCb collaboration foresees a major upgrade of the detector for the high luminosity run that should take place after 2018. Apart from the increase of the instantaneous luminosity at the interaction point of the experiment, one of the major ingredients of this upgrade is a full readout at 40MHz of the sub-detectors and the acquisition of the data by a large farm of PC. The trigger will be done by this farm and should increase the overall trigger efficiency with respect to the current detector, especially in hadronic B meson decays. A general overview of the modifications foreseen to the calorimeter system and the integration of the electromagnetic and hadronic calorimeters in this new scheme will be described.

  18. Primary Vertex Reconstruction for Upgrade at LHCb

    CERN Document Server

    Wanczyk, Joanna

    2016-01-01

    The aim of the LHCb experiment is the study of beauty and charm hadron decays with the main focus on CP violating phenomena and searches for physics beyond the Standard Model through rare decays. At the present, the second data taking period is ongoing, which is called Run II. After 2018 during the long shutdown, the replacement of signicant parts of the LHCb detector is planned. One of main changes is upgrade of the present software and hardware trigger to a more rapid full software trigger. Primary Vertex (PV) is a basis for the further tracking and it is sensitive to the LHC running conditions, which are going to change for the Upgrade. In particular, the center-of-mass collision energy should reach the maximum value of 14 TeV. As a result the quality of the reconstruction has to be studied and the reconstruction algorithms have to be optimized.

  19. Biorefining compounds and organocatalytic upgrading methods

    Science.gov (United States)

    Chen, Eugene Y.; Liu, Dajiang

    2016-10-18

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl)furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  20. Upgrade of ATLAS ITk Pixel Detector

    CERN Document Server

    Huegging, Fabian; The ATLAS collaboration

    2017-01-01

    The high luminosity upgrade of the LHC (HL-LHC) in 2026 will provide new challenges to the ATLAS tracker. The current inner detector will be replaced with an entirely-silicon inner tracker (ITk) which will consist of a five barrel layer Pixel detector surrounded by a four barrel layer Strip detector. The expected high radiation levels are requiring the development of upgraded silicon sensors as well as new a front-end chip. The dense tracking environment will require finer granularity detectors and low mass global and local support structures. The data rates will require new technologies for high bandwidth data transmission and handling. The current status of the ITk ATLAS Pixel detector developments as well as different layout options will be reviewed.

  1. Particle combinations in the LHCb Upgrade trigger

    CERN Document Server

    Zhao, Fanyi

    2017-01-01

    The LHCb experiment will be upgraded during long shutdown II (2018-2020) to process inelastic proton-proton collisions at 30MHz in a software application and run at a higher instantaneous luminosity of $2\\times 10^{33}cm^{−2}s^{−1}$. Each of these collisions will contain substantially more proton-proton interactions and charged particles. It is important to identify the decay vertices of heavy-flavour hadrons produced by the primary proton-proton interaction in an efficient, CPU-performant manner. In this project, I will learn about the LHCb trigger and experimental programme and investigate alternative models for reconstructing these vertices, which may scale more efficiently to the upgraded trigger conditions than the current model.

  2. Upgrading the Atlas Tile Calorimeter Electronics

    CERN Document Server

    Popeneciu, G; The ATLAS collaboration

    2014-01-01

    Tile Calorimeter is the central hadronic calorimeter of the ATLAS experiment at LHC. Around 2024, after the upgrade of the LHC the peak luminosity will increase by a factor of 5 compared to the design value, thus requiring an upgrade of the Tile Calorimeter readout electronics. Except the photomultipliers tubes (PMTs), most of the on- and off-detector electronics will be replaced, with the aim of digitizing all PMT pulses at the front-end level and sending them with 10 Gb/s optical links to the back-end electronics. One demonstrator prototype module is planned to be inserted in Tile Calorimeter in 2015 that will include hybrid electronic components able to probe the new design.

  3. Upgrades for TwinSol facility

    Energy Technology Data Exchange (ETDEWEB)

    O’Malley, P.D.; Bardayan, D.W.; Kolata, J.J.; Hall, M.R.; Hall, O.; Allen, J. [Physics Department, University of Notre Dame, Notre Dame, IN 46556 (United States); Becchetti, F.D. [Physics Department, U. Michigan, Ann Arbor MI 48109 (United States)

    2016-06-01

    TwinSol, a pair of coupled, superconducting solenoids, was one of the first devices capable of producing beams of radioactive nuclei at energies near the Coulomb barrier. A primary beam from University of Notre Dame (UND) tandem accelerator is used to bombard a primary target producing a secondary beam in flight. TwinSol is used to gather, separate, and focus the recoils. Since it was commissioned at the UND in 1997, at least 58 publications have reported data from its use and there have been hundreds of collaborators from many different countries that use this device. Currently, plans are in place at the UND to provide several upgrades to TwinSol, including a multi-cell gas production target and the possible addition of a third solenoid. Upgrades currently in progress will be discussed along with future plans.

  4. Upgrading of bitumen using supercritical water

    Energy Technology Data Exchange (ETDEWEB)

    Kayukawa, T. [JGC Corp., Ibaraki (Japan)

    2009-07-01

    This presentation outlined the technical and economic aspects of thermal cracking by supercritical water. Supercritical water (SCW) is a commonly used method for upgrading heavy oil to produce pipeline-transportable oil from high-viscous bitumen. The process uses water and does not require hydrogen nor catalysts. Pre-heated bitumen and water enter a vertical reactor with flows of counter current at the supercritical point of water. The upgraded synthetic crude oil (SCO) and pitch are obtained from the top of the reactor when the bitumen is thermally cracked. Bench-scale studies have shown that Canadian oil sands bitumen can be converted to 80 volume per cent of SCO and 20 volume per cent of pitch. The SCO has satisfied Canadian pipeline specifications in terms of API gravity and kinetic viscosity. The kinetic viscosity of the pitch has also satisfied boiler fuel specifications. tabs., figs.

  5. Upgradation of automatic liquid scintillation counting system

    International Nuclear Information System (INIS)

    Bhattacharya, Sadhana; Behere, Anita; Sonalkar, S.Y.; Vaidya, P.P.

    2001-01-01

    This paper describes the upgradation of Microprocessor based Automatic Liquid Scintillation Counting systems (MLSC). This system was developed in 1980's and subsequently many systems were manufactured and supplied to Environment Survey labs at various Nuclear Power Plants. Recently this system has been upgraded to a more sophisticated one by using PC add-on hardware and developing Windows based software. The software implements more intuitive graphical user interface and also enhances the features making it comparable with commercially available systems. It implements data processing using full spectrum analysis as against channel ratio method adopted earlier, improving the accuracy of the results. Also it facilitates qualitative as well as quantitative analysis of the β-spectrum. It is possible to analyze a sample containing an unknown β-source. (author)

  6. ATA upgrade to 150 MeV

    International Nuclear Information System (INIS)

    Birx, D.L.; Hawkins, S.A.; Poor, S.E.; Reginato, L.L.; Smith, M.W.

    1985-01-01

    The increased interests in upgrading the ATA accelerator has warranted a preliminary look at applying the magnetic drivers to achieve both higher energy and higher average power. The goal of this upgrade is to satisfy the FEL requirements and to keep the capability of producing a higher current beam for CPB experiments at reduced energy. ATA Note 247 showed that a possible solution to obtain higher energy was simply to add additional cells, run them at higher voltage and accept a 30 ns pulse width with about 5% energy variation. Considering the recent history of the cells and the doubling of the voltage stress that would be required at the insulator, it seemed prudent to review the overall system reliability and try a different approach

  7. Constitutional determinants of nuclear power plant upgrading

    International Nuclear Information System (INIS)

    Mann, Thomas

    2013-01-01

    Around half a year ago the European stress test for nuclear power plants, a precautionary measure initiated by the European Council in March 2011 in response to the Fukushima disaster, revealed that while German nuclear power plants show a high degree of robustness compared with those in other European countries, they nevertheless required upgrading in one or the other respect (earthquake warning systems, protection against crashing civil passenger airplanes). The present article investigates whether this upgrading requirement can justify an injunction to carry out structural retrofitting measures or whether obligations to this end can be excluded on grounds of reasonability in view of the recent decision taken by the German parliament to phase out nuclear energy.

  8. Positron Beam Characteristics at NEPOMUC Upgrade

    Science.gov (United States)

    Hugenschmidt, C.; Ceeh, H.; Gigl, T.; Lippert, F.; Piochacz, C.; Reiner, M.; Schreckenbach, K.; Vohburger, S.; Weber, J.; Zimnik, S.

    2014-04-01

    In 2012, the new neutron induced positron source NEPOMUC upgrade was put into operation at FRMII. Major changes have been made to the source which consists of a neutron-γ-converter out of Cd and a Pt foil structure for electron positron pair production and positron moderation. The new design leads to an improvement of both intensity and brightness of the mono-energetic positron beam. In addition, the application of highly enriched 113Cd as neutron-γ-converter extends the lifetime of the positron source to 25 years. A new switching and remoderation device has been installed in order to allow toggling from the high-intensity primary beam to a brightness enhanced remoderated positron beam. At present, an intensity of more than 109 moderated positrons per second is achieved at NEPOMUC upgrade. The main characteristics are presented which comprise positron yield and beam profile of both the primary and the remoderated positron beam.

  9. Biorefining compounds and organocatalytic upgrading methods

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Eugene Y.; Liu, Dajiang

    2017-11-28

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl) furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  10. Computational sustainability

    CERN Document Server

    Kersting, Kristian; Morik, Katharina

    2016-01-01

    The book at hand gives an overview of the state of the art research in Computational Sustainability as well as case studies of different application scenarios. This covers topics such as renewable energy supply, energy storage and e-mobility, efficiency in data centers and networks, sustainable food and water supply, sustainable health, industrial production and quality, etc. The book describes computational methods and possible application scenarios.

  11. SLC Energy Upgrade Program at SLAC

    International Nuclear Information System (INIS)

    Loew, G.A.; Allen, M.A.; Cassel, R.L.; Dean, N.R.; Konrad, G.T.; Koontz, R.F.; Lebacqz, J.V.

    1985-03-01

    The SLAC Linear Collider (SLC) must reach a nominal center-of-mass energy of 100 GeV to fulfill its high energy physics goals. This paper describes the energy upgrade program that is being implemented on the SLAC linear accelerator to meet these goals. It includes a discussion of the design requirements and available technical options, the rationale for the adopted solution, and the technical problems involved in the engineering and production of klystrons and modulators

  12. SLC energy upgrade program at SLAC

    International Nuclear Information System (INIS)

    Loew, G.A.; Allen, M.A.; Cassel, R.L.; Dean, N.R.; Konrad, G.T.; Koontz, R.F.; Lebacqz, J.V.

    1985-01-01

    The SLAC Linear Collider (SLC) must reach a nominal center-of-mass energy of 100 GeV to fulfill its high energy physics goals. This paper describes the energy upgrade program that is being implemented on the SLAC linear accelerator to meet these goals. It includes a discussion of the design requirements and available technical options, the rationale for the adopted solution, and the technical problems involved in the engineering and production of klystrons and modulators

  13. The SLC energy upgrade program at SLAC

    International Nuclear Information System (INIS)

    Loew, G.A.; Allen, M.A.; Cassel, R.L.; Dean, N.R.; Konrad, G.T.; Koontz, R.F.; Lebaaqz, J.V.

    1985-01-01

    The SLAC Linear Collider (SLC) must reach a nominal center-of-mass energy of 100 GeV to fulfill its high energy physics goals. This paper describes the energy upgrade program that is being implemented on the SLAC linear accelerator to meet these goals. It includes a discussion of the design requirements and available technical options, the rationale for the adopted solution, and the technical problems involved in the engineering and production of klystrons and modulators

  14. Upgrade of the ALICE Inner Tracking System

    OpenAIRE

    Reidt, Felix; Collaboration, for the ALICE

    2014-01-01

    During the Long Shutdown 2 of the LHC in 2018/2019, the ALICE experiment plans the installation of a novel Inner Tracking System. It will replace the current six layer detector system with a seven layer detector using Monolithic Active Pixel Sensors. The upgraded Inner Tracking System will have significantly improved tracking and vertexing capabilities, as well as readout rate to cope with the expected increased Pb-Pb luminosity of the LHC. The choice of Monolithic Active Pixel Sensors has be...

  15. CORRECTION SYSTEMS UPGRADE FOR THE SNS RING

    International Nuclear Information System (INIS)

    PAPAPHILIPPOU, Y.; GARDNER, C.J.; LEE, Y.Y.; WEI, J.

    2001-01-01

    In view of the changes in the design of the SNS ring from the original FODO lattice [l] to the 220m hybrid lattice [2] and finally 1.3GeV compatible 248m ring [3], complementary studies have been undertaken, in order to upgrade its correction packages. We review the evolution of the correction systems and present the accelerator physics studies for the adopted schemes and powering plan

  16. The upgrade of the LHCb trigger system

    CERN Document Server

    INSPIRE-00259834; Fitzpatrick, C.; Gligorov, V.; Raven, G.

    2014-10-20

    The LHCb experiment will operate at a luminosity of $2\\times10^{33}$ cm$^{-2}$s$^{-1}$ during LHC Run 3. At this rate the present readout and hardware Level-0 trigger become a limitation, especially for fully hadronic final states. In order to maintain a high signal efficiency the upgraded LHCb detector will deploy two novel concepts: a triggerless readout and a full software trigger.

  17. The FELIX experimental program and future upgrades

    International Nuclear Information System (INIS)

    Turner, L.R.; Praeg, W.F.; Lari, R.J.; Wehrle, R.B.

    1981-01-01

    As part of the DOE First Wall/Blanket/Shield (FW/B/S) Engineering Test Program, Argonne National Laboratory FELIX (Fusion ELectromagnetic Induction EXperiment to study electromagnetic effects. T.he earliest test will select and verify appropriate eddy current simulation computer program (codes), followed by component concept tests, component model tests, and finally tests with prototypes. This paper describes the experimental and computer code plans and future upgrades for the FELIX facility

  18. Upgrade of the ATLAS Tile Calorimeter Electronics

    International Nuclear Information System (INIS)

    Carrió, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase-II) where the peak luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expected to happen around 2024. The TileCal upgrade aims at replacing the majority of the on- and off- detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, configuration and detector control. For the off-detector electronics a pre-processor (sROD) is being developed, which takes care of the initial trigger processing while temporarily storing the main data flow in pipeline and derandomizer memories. One demonstrator prototype module with the new calorimeter module electronics, but still compatible with the present system, is planned to be inserted in ATLAS this year

  19. Upgrade trigger & reconstruction strategy: 2017 milestone

    CERN Document Server

    Albrecht, Johannes; Campora Perez, Daniel Hugo; Cattaneo, Marco; Marco, Clemencic; Couturier, Ben; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Hill, Donal; Jones, Christopher Rob; Lemaitre, Florian; Lupton, Olli; Matev, Rosen; Pearce, Alex; Polci, Francesco; Promberger, Laura; Ponce, Sebastien; Quagliani, Renato; Raven, Gerhard; Sciascia, Barbara; Schiller, Manuel Tobias; Stahl, Sascha; Szymanski, Maciej Pawel; Chefdeville, Maximilien

    2018-01-01

    The LHCb collaboration is currently preparing an update of the experiment to take data in Run 3 of the LHC. The dominant feature of this upgrade is a trigger-less readout of the full detector followed by a full software trigger. To make optimal use of the collected data, the events are reconstructed at the inelastic collision rate of 30 MHz. This document presents the baseline trigger and reconstruction strategy as of the end of 2017.

  20. INPP safety upgrade programme. Accomplishments and progress

    International Nuclear Information System (INIS)

    Vaisnys, P.

    1996-01-01

    The safety upgrade programme consists of the following parts: Post Chernobyl immediate modifications undertaken to remove obvious deficiencies discovered in the course of analysis of the main causes of Chernobyl accident; Modifications to remove gaps in safety provision discovered as a result of safety assessment investigations; Modifications to remove evident discrepancies in respect to internationally accepted standard. As it follows from above the deep safety investigations were undertaken to put their findings into concrete improvement programme

  1. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  2. Sustainable Universities

    DEFF Research Database (Denmark)

    Grindsted, Thomas Skou

    2011-01-01

    Declarations on Sustainability in Higher Education (SHE) can be viewed as a piece of international regulation. Over the past 30 years research at universities has produced convincing data to warn about deterioration of the environment, resource scarcity and the need for sustainability. This in turn....... Declarations tend to have impact on three trends. Firstly, there is emerging international consensus on the university’s role and function in relation to sustainable development; secondly, the emergence of national legislation, and thirdly, an emerging international competition to be leader in sustainable...

  3. The APS control system network upgrade

    International Nuclear Information System (INIS)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-01-01

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network

  4. Core exit thermocouple upgrade at Zion station

    International Nuclear Information System (INIS)

    Ulinski, T.M.; Ferg, D.A.

    1989-01-01

    Following the Three Mile Island accident, the ability of the core exit thermocouple (CET) system to monitor reactor core conditions and core cooling status became a requirement of the U.S. Nuclear Regulatory Commission (NRC). Since the thermocouple system at Zion station was not originally required for postaccident monitoring, Commonwealth Edison Company (CECo) committed to upgrading the CET system and to installing a subcooling margin monitoring (SMM) system. The significance of this commitment was that CECo proposed to accomplish the upgrade effort using internal resources and by developing the required in-house expertise instead of procuring integrated packages from several nuclear steam supply system vendors. The result was that CECo was able to demonstrate a number of new capabilities and unique design features with a significant cost savings. These included a qualified connector with an integral thermocouple cold-reference junction temperature compensation; the design, assembly, testing, and installation of a seismically qualified class 1E microprocessor; a commercial-grade dedication/upgrade process for safety-related hardware; a human factors review capability, and a verification and validation program for safety-related software. A discussion of these new capabilities and details of the design features is presented in this paper

  5. Upgrading primary heat transport pump seals

    International Nuclear Information System (INIS)

    Graham, T.; Metcalfe, R.; Rhodes, D.; McInnes, D.

    1995-01-01

    Changes in the operating environment at the Bruce-A Nuclear Generating Station created the need for an upgraded Primary Heat Transport Pump (PHTP) seal. In particular, the requirement for low pressure running during more frequent start-ups exposed a weakness of the CAN2 seal and reduced its reliability. The primary concern at Bruce-A was the rotation of the CAN2 No. 2 stators in their holders. The introduction of low pressure running exacerbated this problem, giving rapid wear of the stator back face, overheating, and thermocracking. In addition, the resulting increase in friction between the stator and its holder increased stationary-side hysteresis and thereby changed the seal characteristic to the point where interseal pressure oscillations became prevalent. The resultant increased hysteresis also led to hard rubbing of the seal faces during temperature transients. An upgraded seal was required for improved reliability to avoid forced outages and to reduce maintenance costs. This paper describes this upgraded 'replacement seal' and its performance history. In spite of the 'teething' problems detailed in this paper, there have been no forced outages due to the replacement seal, and in the words of a seal maintenance worker at Bruce-A, 'it allows me to go home and sleep at night instead of worrying about seal failures.' (author)

  6. LHCb; DAQ Architecture for the LHCb Upgrade

    CERN Multimedia

    Neufeld, N

    2013-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2x 10$^{33}$ cm$^{-2}$ . s$^{-1}$. The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of HCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and (relative) cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ ...

  7. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  8. Proposal to upgrade the MIPP experiment

    Energy Technology Data Exchange (ETDEWEB)

    Isenhower, D.; Sadler, M.; Towell, R.; Watson, S. [Abilene Christian Univ., TX (United States); Peterson, R. J. [Univ. of Colorado, Boulder, CO (United States); Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gutbrod, H.; Peters, K. [GSI-Darmstadt (Germany); Feldman, G. [Harvard Univ., Cambridge, MA (United States); Torun, Y. [Illinois Inst. of Technology, Chicago, IL (United States); Messier, M. D.; Paley, J. [Indiana Univ., Bloomington, IN (United States)

    2006-09-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

  9. The deuterium inventory in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Mayer, M.; Rohde, V.; Ramos, G; Vainonen-Ahlgren, E.; Likonen, J.; Herrmann, A.; Neu, R.

    2007-01-01

    The deuterium inventory in ASDEX Upgrade was determined by quantitative ion beam analysis techniques and SIMS for different discharge campaigns between the years 2002 and 2005. ASDEX Upgrade was a carbon dominated machine during this phase. Full poloidal sections of the lower and upper divertor tile surfaces, limiter tiles, gaps between divertor tiles, gaps between inner heat shield tiles and samples from remote areas below the roof baffle and in pump ducts were analysed, thus offering an exhaustive survey of all relevant areas in ASDEX Upgrade. Deuterium is mainly trapped on plasma-exposed surfaces of inner divertor tiles, where about 70% of the retained deuterium inventory is found. About 20% of the inventory is retained at or below the divertor roof baffle, and about 10% is observed in other areas, such as the outer divertor and in gaps between tiles. The long term deuterium retention is 3-4% of the total deuterium input. The obtained results are compared with gas balance measurements, and conclusions about tritium retention in ITER are made

  10. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Jeitler, Manfred; Rabady, Dinyar; Sakulin, Hannes; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run-II of the Large Hadron Collider poses new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run-I, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new μTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (μGMT) which sorts and removes duplicates from boundaries of the muon trigger sub-systems. Furthermore, it determines how isolated the muon candidates are based on calorimetric energy deposits. The μGMT will be implemented using a processing board that features a larg...

  11. DAQ Architecture for the LHCb Upgrade

    International Nuclear Information System (INIS)

    Liu, Guoming; Neufeld, Niko

    2014-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2 × 10 33 cm −2 s −1 . The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of LHCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of ∼ 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and relative cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ system.

  12. Actuator management for ECRH at ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rapson, Christopher J., E-mail: chris.rapson@ipp.mpg.de; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-10-15

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  13. Actuator management for ECRH at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Rapson, Christopher J.; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-01-01

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  14. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Souza, J; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5-fold compared to the design luminosity (10exp34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2023. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. The smallest independent on-detector electronics module has been reduced from 45 channels to 6, greatly reducing the consequences of a failure in the on-detector electronics. The size of t...

  15. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Reed, Robert; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the main hadronic calorimeter covering the central region of the ATLAS experiment at LHC. TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC operation (Phase 2 around 2023) where the peak luminosity will increase 5x compared to the design luminosity (10^{34} cm^{-2}s^{-1}) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims to replace the majority of the on- and off-detector electronics so that all calorimeter signals can be digitized and directly sent to the off-detector electronics in the counting room. This will reduce pile-up problems and allow more complex trigger algorithms. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to t...

  16. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase 2) where the peak luminosity will increase 5$\\times$ compared to the design luminosity ($10^{34} cm^{-2}s^{-1}$) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, c...

  17. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (P hase - II ) where the pea k luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expe cted to happen around 202 4 . The TileCal upgrade aims at replacing the majority of the on - and off - detector electronics to the extent that all calorimeter signals will be digitized and sent to the off - detector electronics in the counting room. To achieve th e required reliability, redundancy has been introduced at different levels. Three different options are presently being investiga...

  18. Upgrade of the Proton West secondary beamline

    International Nuclear Information System (INIS)

    Spiegel, L.

    1989-01-01

    As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p + /π + or p - /π - , were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs

  19. NSTX-U Control System Upgrades

    International Nuclear Information System (INIS)

    Erickson, K.G.; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-01-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control

  20. Control system for Fermilab's low temperature upgrade

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab recently upgraded the Tevatron Cryogenic Systems to allow for lower temperature operation. This Lower Temperature Upgrade grew out of a desire to increase the Colliding Beam Physics energy from 900 GeV to 1000 GeV. A key element in achieving this goal is the new cryogenic control system designed at Fermilab and installed in 24 satellite refrigerators and 8 compressor buildings. The cryogenic improvements and addition hardware like cold compressors exceeded the capability of the original distributed controls package. The new distributed controls package uses a Multibus II platform and Intel's 80386 microprocessor. Token Ring is used as the link to the systems 6 primary crate locations with Arcnet used as the connection to the systems numerous I/O crates. I/0 capabilities are double the capabilities of the original system. Software has also been upgraded with the introduction of more flexible control loop strategies and Finite State Machines used for automatic sequential control, like quench recovery or cold compressor pump down

  1. NSTX-U Control System Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, K.G., E-mail: kerickso@pppl.gov; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-06-15

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  2. Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

    Energy Technology Data Exchange (ETDEWEB)

    Le Blanc, Katya [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rice, Brandon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ulrich, Thomas [Idaho National Lab. (INL), Idaho Falls, ID (United States); Boring, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.

  3. Proceedings of the 5. NCUT upgrading and refining conference 2009 : bitumen, synthetic crude oil and heavy oil

    International Nuclear Information System (INIS)

    2009-01-01

    This conference examined various upgrading technologies related to bitumen production. It provided a forum to review new developments to exploit oil sands bitumen and extra heavy crudes in terms of production, upgrading and environmental issues facing the industry. This 2009 conference focused on the many existing and emerging technical solutions that will help consolidate the position of the vast reserves in Western Canada as a sustainable source of crudes for North America and other selected markets. Some of the technical challenges that have an effect on upgrading include poor quality bitumen and heavy oils; bitumen and diluent blending; pipeline issues; desalting; fouling and corrosion; high costs; dependence on natural gas for energy; poor middle distillates; and greenhouse gas emissions. The sessions of the conference were entitled: heavy oil and bitumen upgrading technologies; secondary upgrading and refining technologies; bitumen transportation; and bitumen and heavy oil processability. The conference featured a total of 50 presentations and posters, of which 43 have been catalogued separately for inclusion in this database. tabs., figs

  4. Sustainable Transition

    DEFF Research Database (Denmark)

    Hansen, Ole Erik; Søndergård, Bent

    2014-01-01

    of agendas/vision, technologies, actors and institutions in the emergent design of an urban mobility system based on an electric car sharing system. Why. Designing for sustainability is a fundamental challenge for future design practices; designers have to obtain an ability to contribute to sustainable...

  5. Sustainable transformation

    DEFF Research Database (Denmark)

    Andersen, Nicolai Bo

    This paper is about sustainable transformation with a particular focus on listed buildings. It is based on the notion that sustainability is not just a question of energy conditions, but also about the building being robust. Robust architecture means that the building can be maintained and rebuil...

  6. Sustainability Labeling

    NARCIS (Netherlands)

    Dam, van Y.K.

    2017-01-01

    Sustainability labeling originated from a need to protect the identity of alternative systems of food production and to increase market transparency. From the 1980s onwards sustainability labeling has changed into a policy instrument replacing direct government regulation of the food market, and a

  7. Afterschool Sustainability

    Directory of Open Access Journals (Sweden)

    Hilary D. Joyce

    2014-12-01

    Full Text Available Youth participation in quality extended learning opportunities (ELOs results in positive academic, physical, mental health, and social/emotional outcomes. Funding is essential to implementing and sustaining quality ELOs; however multiple funding barriers and challenges exist. Understanding the types of funds available for ELOs and the factors that influence sustainability is critical. Through surveys and telephone interviews of ELO providers, this descriptive study identified and examined ELO funding streams, the ways ELO providers use these funding streams, and the barriers and challenges to sustainability. ELO programs often relied on one major funding stream coupled with nutrition supports as well as in-kind resources. Barriers to sustainability included year-to-year funding, transportation costs, reducing community partnerships, and difficulty in diversifying funds. Recommendations to enhance ELO sustainability are offered, particularly in relation to overcoming the challenges to diversification of funding resources and establishing mutually supportive partnerships and collaboration.

  8. Operational modeling of a sustainable gas supply chain

    NARCIS (Netherlands)

    Bekkering, Jan; Broekhuis, A. A.; van Gemert, Wim

    2010-01-01

    Biogas production from codigestion of cattle manure and biomass can have a significant contribution to a sustainable gas supply when this gas is upgraded to specifications prescribed for injection into the national gas grid and injected into this grid. In this study, we analyzed such a gas supply

  9. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade was performed during the Extended Year End Technical Stop of 2016 and 2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  10. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade is being performed during the Extended Year End Technical Stop of 2016 â?? 2017. In the framework of the upgrade, the PMT boxes are being reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics is also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to eliminate the background to have an effect on the trigger. Following this major upgrade, the Hadron Forward Calorimeters will be commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  11. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    Science.gov (United States)

    Bilki, B.; Onel, Y.

    2018-03-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I Upgrade was performed during the Extended Year End Technical Stop of 2016-2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  12. Energy upgrades as financial or strategic investment? Energy Star property owners and managers improving building energy performance

    International Nuclear Information System (INIS)

    Gliedt, Travis; Hoicka, Christina E.

    2015-01-01

    Highlights: • Energy Star property owners/managers view energy as strategic or financial investments. • Energy performance improvements and motivations differ by property type. • Energy projects are most often funded by internal cash reserves. • Motivations and funding sources differ by type of energy project. • Environmental sustainability is an important criterion in many energy projects. - Abstract: Due to its significant carbon footprint and cost-effectiveness for upgrades, the commercial property sector is important for climate change mitigation. Although barriers to energy system changes, such as funding, financing and information, are well recognized, Energy Star property owners and managers are successfully overcoming these barriers and instigating energy efficiency upgrades, renewable energy installations, and behavior and management programs. To examine the decision-making process that leads to energy performance improvements, a national survey of property owners and management organizations of buildings that earned an Energy Star score of 75 or higher was conducted. The extent to which energy upgrades were considered strategic investments motivated by environmental sustainability or corporate social responsibility, or financial investments motivated by payback period or return-on-investment criteria, was contingent upon the property type and type of energy project. Environmental sustainability was found to be an important motivation for energy projects in office spaces in general, but in the case of smaller office spaces was often combined with motivations for corporate social responsibility. Energy projects on education properties were motivated by financial investment. Building envelope and mechanical efficiency upgrades were considered financial investments, while renewable energy, green roofs, and water conservation technologies were considered environmental sustainability initiatives

  13. Catalytic Hydrothermal Conversion of Wet Biomass Feedstocks and Upgrading – Process Design and Optimization

    DEFF Research Database (Denmark)

    Hoffmann, Jessica; Toor, Saqib; Rosendahl, Lasse

    Liquid biofuels will play a major role for a more sustainable energy system of the future. The CatLiq® process is a 2nd generation biomass conversion process that is based on hydrothermal liquefaction. Hydrothermal liquefaction offers a very efficient and feedstock flexible way of converting...... biomass to bio-oil. Bio-oils from hydrothermal liquefaction are characterised by their high feedstock flexibility. Upgrading of complete bio-oils derived from hydrothermal conversion has not yet been extensively studied. Purpose of this work is to reduce the oxygen content of the bio-oil to improve...

  14. Experiences when employing different alternatives for envelope upgrading

    Directory of Open Access Journals (Sweden)

    Peru Elguezabal Esnarrizaga

    2015-06-01

    Full Text Available The challenges of achieving the 2020 goals in terms of energy savings and improving efficiency are guiding numerous research initiatives looking for more insulated envelopes, dealing with thermal performance of insulation materials and envelope systems. Nevertheless, the envelope integrates within the building and this improvement on the insulation performance has to be properly adopted, taking into account the interrelation of main elements composing the overall system (facade, frame, slabs, openings, partitions etc., as well as side effects originated not only for new erected buildings, but specifically in renovation and retrofitting works. This paper describes real experiences when considering various options for upgrading the facade through the increase of the insulation capacity, starting from external overcladding prefabricated panels and ventilated facades, advancing to more sustainable low carbon systems and ending with even more highly insulated solutions employing aerogels. Lessons from these cases, where energy and hygrothermal assessments have being carried out, demonstrate the influence of the design and construction phases and the relevance of disregarded effects such as minor thermal bridges, uncontrolled craftsmanship on site, and moisture transfer for the different technologies considered. Finally, possible alternatives are provided to overcome some of the detected difficulties, such as combination with non-metallic structural components and building membranes, and being prepared for future challenges and new developments when these isolative elements are combined with other technologies, as for example, renewable energy harvesting devices.  

  15. Sustainable Cities

    DEFF Research Database (Denmark)

    Georg, Susse; Garza de Linde, Gabriela Lucía

    Judging from the number of communities and cities striving or claiming to be sustainable and how often eco-development is invoked as the means for urban regeneration, it appears that sustainable and eco-development have become “the leading paradigm within urban development” (Whitehead 2003....../assessment tool. The context for our study is urban regeneration in one Danish city, which had been suffering from industrial decline and which is currently investing in establishing a “sustainable city”. Based on this case study we explore how the insights and inspiration evoked in working with the tool...

  16. Kansas State University accelerator laboratory upgrade

    International Nuclear Information System (INIS)

    Richard, P.

    1989-01-01

    The J.R. Macdonald Laboratory is undergoing a major upgrade of its facilities and capabilities. The laboratory is dedicated to the study of ion-atom collisions using highly charged ions from accelerators and/or ion sources. The mainstay of the laboratory over the last two decades has been a 6 MV tandem accelerator. It has been used to produce one- to a few-MeV/u highly charged ions for studying high energy atomic collisions, and to produce recoil ions from ocllisions with projectile ions for studying low energy atomic collisions. In order to enhance the capabilities of studying atomic collisions in these two energy regimes, we are constructing a superconducting LINAC booster to the tandem, and a stand-alone CRYEBIS source. The project, which is funded by the US Department of Energy, began in May 1985 with a May 1989 completion schedule. The upgrade includes a building addition, funded by the State of Kansas, to house the new facilities. The LINAC consists of a time-superbunching module, followed by three large cryostat modules each containing four superconducting resonators, and followed by an energy-rebunching module. The resonators are the split-ring superconducting Nb type designed and constructed at Argonne National Laboratory, and are presently being tested at KSU. The CRYEBIS source, which consists of a 1 m long 5 T superconducting solenoid with a high degree of straightness, is in the final stages of assembly. We have in operation a new computer network for data acquisition and analysis. A progress report on the status of the upgrade is presented. (orig.)

  17. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  18. Upgraded operator training by using advanced simulators

    International Nuclear Information System (INIS)

    Iwashita, Akira; Toeda, Susumu; Fujita, Eimitsu; Moriguchi, Iwao; Wada, Kouji

    1991-01-01

    BWR Operator Training Center Corporation (BTC) has been conducting the operator training for all BWR utilities in Japan using fullscope simulators. Corresponding to increasing quantitative demands and higher qualitative needs of operator training, BTC put advanced simulators in operation (BTC-2 simulator in 1983 and BTC-3 simulator in 1989). This paper describes the methods and the effects of upgraded training contents by using these advanced simulators. These training methods are applied to the 'Advanced Operator Training course,' the 'Operator Retraining Course' and also the 'Family (crew) Training Course.' (author)

  19. Safety upgrading at PAKS Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bajsz, J.; Elter, J.

    2000-01-01

    The operation of Paks NPP has reached its half time. Until this time the plant fulfilled expectations raised before its construction: the four units have produced safely and reliably more than 200 TWh electricity. The production of the plant has been at the stable level since its construction and has provided 43-38 % of electricity consumed in Hungary. The annual production is around 14 TWh, which means a load factor higher than 85 %. Safety upgrading activities [1] at Paks had started in the late eighties, when the commissioning work of units 3 and 4 were carried out. That time the main emphases were put to lessons learned of the TMI and Chernobyl accidents. The international reviews hosted by our plant widened our review's scope. To systematize our approach a complete safety review, the AGNES (Advanced General Safety and New Evaluation of Safety) project was started in 1991. The goal of the project was to evaluate to what extent Paks NPP satisfied the current international safety expectations and to help in determining the priorities for safety enhancement and upgrading measures. The project completed in 1994 ranked our safety upgrading measures by safety significance, which became a basis for technical design work and financial scheduling. The other important outcome of the AGNES project was the introduction the Periodical Safety Review regime by our nuclear authority. These periodical reviews held after 10 years of operation offer the possibility - and obligation for the licensee - to perform a comprehensive assessment of the safety of the plant, to evaluate the integral effects of changes of circumstances happened during the review period. The goal of these reviews is to deal with cumulative effects of NPP ageing, modifications, operating experience and technical developments aimed at ensuring a high level of safety throughout plant service life. The execution of our safety-upgrading program is well advancing. For the whole program from 1996 to 2002 250

  20. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  1. Upgrading of hydropyrolysis coal tar by hydroprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Haglund, R.; Otterstedt, J.E.; Sterte, J. (Chalmers Univ. of Tech., Goeteborg (Sweden). 1. Dept. of Engineering Chemistry)

    1991-05-01

    Upgrading of a hydropyrolysis coal tar by hydroprocessing was investigated using different process conditions. The response of the hydropyrolysis tar to hydroprocessing was compared to those of a conventional coal tar and two heavy oil fractions. At comparable conditions, the removal of heteroatoms from the hydropyrolysis tar was more effective than from the conventional tar and, in particular, than from the oil fractions. Using conditions typical for hydroprocessing of heavy oil fractions, the contents of N, O as well as S in the hydropyrolysis tar were reduced by more than 90%. Hydroprocessing also resulted in a considerable increase in the gasoline fraction of the tar. (orig.).

  2. Trigger tracking for the LHCb upgrade

    CERN Multimedia

    Dungs, K

    2014-01-01

    This poster presents a trigger system for the upgraded LHCb detector, scheduled to begin operation in 2020. The proposed trigger system is implemented entirely in software. We show that track reconstruction of a similar quality to that available in the offline algorithms can be performed on the full inelastic pp-collision rate. A track finding efficiency of 98.8% relative to offline can be achieved for good trigger tracks. The CPU time required for this reconstruction is less than 60% of the available budget.

  3. Recent ECRH results in ASDEX upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Dux, R.; Gantenbein, G.

    2003-01-01

    This paper provides an overview on recent experimental results obtained in ASDEX Upgrade using electron cyclotron heating and current drive. The following topics are covered: determination of the power deposition profile, modulated power deposition, studies of the electron heat transport via power balance and heat wave analysis and a comparison with turbulent transport theory, generation of an internal transport barrier for the electron heat flux, impact of electron cyclotron resonance heating (ECRH) on particle and impurity transport, and studies related to neoclassical tearing modes and to sawteeth. (author)

  4. Fermilab linac upgrade. Module conditioning results

    International Nuclear Information System (INIS)

    Kroc, T.; Moretti, A.; Popovic, M.

    1992-01-01

    The 805 MHz side-coupled cavity modules for the Fermilab 400 MeV linac upgrade have been conditioned to accept full power. The sparking rate in the cavities and in the side cells has been reduced to acceptable levels. It required approximately 40 x 10 6 pulses for each module to achieve an adequately low sparking rate. This contribution outlines the commissioning procedure, presents the sparking rate improvements and the radiation level improvements through the commissioning process and discusses the near-on-line commissioning plans for this accelerator. (Author) ref., 4 figs

  5. Fermilab Linac Upgrade: Module conditioning results

    International Nuclear Information System (INIS)

    Kroc, T.; Moretti, A.; Popovic, M.

    1992-12-01

    The 805 MHz Side-coupled cavity modules for the Fermilab 400 MeV linac upgrade have been conditioned to accept full power. The sparking rate in the cavities and in the side-cells has been reduced to acceptable levels. It required approximately 40 x 10 6 pulses for each module to achieve an adequately low sparking rate. This contribution outlines the commissioning procedure, presents the sparking rate improvements and the radiation level improvements through the commissioning process and disc the near-online commissioning plans for this accelerator

  6. Upgrading of boron ores and colemanite flotation

    International Nuclear Information System (INIS)

    Yarar, B.; Mager, J.

    1979-01-01

    Processes applied for the processing and upgrading of sodium and calcium borates in Turkey are described. Details of froth flotation study where a low grade colemanite ore containing calcite and clays as a gangue minerals are given. It has been found that, at the natural pH of a colemanite-containing pulp (pH=9,2) it is possible to float colemanite selectively using dodecyl benzene sulphonate or its combinations with a non-polar reagent or naphthenic acids. (author)

  7. Upgradable Software Product Customization by Code Query

    DEFF Research Database (Denmark)

    Vaucouleur, Sebastien

    The professional press on enterprise systems warns its readers: Costly., A return on investment killer. , Be prepared!. What can create some much af- iction and turmoil in an otherwise very successful industry? Come and meet the dreadful upgrade problem. Enterprise systems are prime examples...... of a subset of software systems that we call software products: software that needs special support for customization. Through customization, external companies can modify part of the original product to better t the needs of a niche market. Upon the release of a new version of the original software product...

  8. Upgrade of the CMS Event Builder

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    The Data Acquisition (DAQ) system of the Compact Muon Solenoid (CMS) experiment at CERN assembles events at a rate of 100 kHz, transporting event data at an aggregate throughput of 100 GB/s. By the time the LHC restarts after the 2013/14 shut-down, the current compute nodes and networking infrastructure will have reached the end of their lifetime. We are presenting design studies for an upgrade of the CMS event builder based on advanced networking technologies such as 10 Gb/s Ethernet. We report on tests and performance measurements with small-scale test setups.

  9. Alaska Seismic Network Upgrade and Expansion

    Science.gov (United States)

    Sandru, J. M.; Hansen, R. A.; Estes, S. A.; Fowler, M.

    2009-12-01

    AEIC (Alaska Earthquake Information Center) has begun the task of upgrading the older regional seismic monitoring sites that have been in place for a number of years. Many of the original sites (some dating to the 1960's) are still single component analog technology. This was a very reasonable and ultra low power reliable system for its day. However with the advanced needs of today's research community, AEIC has begun upgrading to Broadband and Strong Motion Seismometers, 24 bit digitizers and high-speed two-way communications, while still trying to maintain the utmost reliability and maintaining low power consumption. Many sites have been upgraded or will be upgraded from single component to triaxial broad bands and triaxial accerometers. This provided much greater dynamic range over the older antiquated technology. The challenge is compounded by rapidly changing digital technology. Digitizersand data communications based on analog phone lines utilizing 9600 baud modems and RS232 are becoming increasingly difficult to maintain and increasingly expensive compared to current methods that use Ethernet, TCP/IP and UDP connections. Gaining a reliable Internet connection can be as easy as calling up an ISP and having a DSL connection installed or may require installing our own satellite uplink, where other options don't exist. LANs are accomplished with a variety of communications devices such as spread spectrum 900 MHz radios or VHF radios for long troublesome shots. WANs are accomplished with a much wider variety of equipment. Traditional analog phone lines are being used in some instances, however 56K lines are much more desirable. Cellular data links have become a convenient option in semiurban environments where digital cellular coverage is available. Alaska is slightly behind the curve on cellular technology due to its low population density and vast unpopulated areas but has emerged into this new technology in the last few years. Partnerships with organizations

  10. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  11. MHD equilibrium identification on ASDEX-Upgrade

    International Nuclear Information System (INIS)

    McCarthy, P.J.; Schneider, W.; Lakner, K.; Zehrfeld, H.P.; Buechl, K.; Gernhardt, J.; Gruber, O.; Kallenbach, A.; Lieder, G.; Wunderlich, R.

    1992-01-01

    A central activity accompanying the ASDEX-Upgrade experiment is the analysis of MHD equilibria. There are two different numerical methods available, both using magnetic measurements which reflect equilibrium states of the plasma. The first method proceeds via a function parameterization (FP) technique, which uses in-vessel magnetic measurements to calculate up to 66 equilibrium parameters. The second method applies an interpretative equilibrium code (DIVA) for a best fit to a different set of magnetic measurements. Cross-checks with the measured particle influxes from the inner heat shield and the divertor region and with visible camera images of the scrape-off layer are made. (author) 3 refs., 3 figs

  12. Wideband feeds for the upgraded GMRT

    International Nuclear Information System (INIS)

    Bandari, Hanumanth Rao; Sankarasubramanian, G; Kumar, A Praveen

    2013-01-01

    This paper describes the existing feeds in use at the GMRT Observatory and details the ongoing development of next generation wideband feeds for the upgraded GMRT. The existing feeds include: feed with folded thick dipoles (for 150 MHz), dipole-disc feed (for 325 MHz), dual-band coaxial feed (for 233 MHZ and 610 MHz), and corrugated horn feed (for 1400–1450 MHz). The new broadband feeds covered in this paper are: cone-dipole feeds for 250–500 and 500–1000 MHz, wideband horn feed for 550–900 MHz, and dual ring feed for 130–260 MHz. Design techniques and performance results for these are described.

  13. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  14. Silicon Sensors for the Upgrades of the CMS Pixel Detector

    CERN Document Server

    Centis Vignali, Matteo; Schleper, Peter

    2015-01-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accel- erator and its injection chain. Two major upgrades will take place in the next years. The rst upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2 10 34 cm-2 s-1 A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5 10 34 cm-2 s1. As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The rst upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout elec- tronics that allow ecient data taking up to a luminosity of 2 10 34 cm-2s-1,twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at dierent institutes. Ham...

  15. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  16. Sustainable Transportation

    DEFF Research Database (Denmark)

    Hall, Ralph P.; Gudmundsson, Henrik; Marsden, Greg

    2014-01-01

    The transportation system is the backbone of economic and social progress and the means by which humans access goods and services and connect with one another. Yet, as the scale of transportation activities has grown worldwide, so too have the negative environmental, social, and economic impacts...... that relate to the construction and maintenance of transportation infrastructure and the operation or use of the different transportation modes. The concept of sustainable transportation emerged in response to these concerns as part of the broader notion of sustainable development. Given the transportation...... sector’s significant contribution to global challenges such as climate change, it is often said that sustainable development cannot be achieved without sustainable transportation....

  17. Agriculture: Sustainability

    Science.gov (United States)

    Sustainability creates and maintains the conditions under which humans and nature can exist in productive harmony, that permit fulfilling the food, feed, and fiber needs of our country and the social, economic and other requirements.

  18. Sustainable consumption

    DEFF Research Database (Denmark)

    Prothero, Andrea; Dobscha, Susan; Freund, Jim

    2011-01-01

    This essay explores sustainable consumption and considers possible roles for marketing and consumer researchers and public policy makers in addressing the many sustainability challenges that pervade our planet. Future research approaches to this interdisciplinary topic need to be comprehensive...... and systematic and will benefit from a variety of different perspectives. There are a number of opportunities for future research, and three areas are explored in detail. First, the essay considers the inconsistency between the attitudes and behaviors of consumers with respect to sustainability; next, the agenda...... is broadened to explore the role of individual citizens in society; and finally, a macro institutional approach to fostering sustainability is explored. Each of these areas is examined in detail and possible research avenues and public policy initiatives are considered within each of these separate...

  19. Sustainable Futures

    Science.gov (United States)

    Sustainable Futures is a voluntary program that encourages industry to use predictive models to screen new chemicals early in the development process and offers incentives to companies subject to TSCA section 5.

  20. Sustainability reporting

    NARCIS (Netherlands)

    Kolk, A.

    2005-01-01

    This article gives an overview of developments in sustainability (also sometimes labelled corporate social responsibility) reporting. The article will first briefly indicate how accountability on social and environmental issues started, already in the 1970s when social reports were published.

  1. Sustainable transformation

    DEFF Research Database (Denmark)

    Andersen, Nicolai Bo

    This paper is about sustainable transformation with a particular focus on listed buildings. It is based on the notion that sustainability is not just a question of energy conditions, but also about the building being robust. Robust architecture means that the building can be maintained and rebuilt......, that it can be adapted to changing functional needs, and that it has an architectural and cultural value. A specific proposal for a transformation that enhances the architectural qualities and building heritage values of an existing building forms the empirical material, which is discussed using different...... theoretical lenses. It is proposed that three parameters concerning the ꞌtransformabilityꞌ of the building can contribute to a more nuanced understanding of sustainable transformation: technical aspects, programmatic requirements and narrative value. It is proposed that the concept of ꞌsustainable...

  2. Sustainable Consumption

    DEFF Research Database (Denmark)

    Røpke, Inge

    2015-01-01

    The intention of this chapter is to explore the role of consumption and consumers in relation to sustainability transition processes and wider systemic transformations. In contrast to the individualistic focus in much research on sustainable consumption, the embeddedness of consumption activities...... in wider social, economic and technological frameworks is emphasised. In particular, the chapter is inspired by practice theory and transition theory. First, various trends in consumption are outlined to highlight some of the challenges for sustainability transitions. Then, it is discussed how consumption...... patterns are shaped over time and what should be considered in sustainability strategies. While discussions on consumption often take their point of departure in the perspective of the individual and then zoom to the wider context, the present approach is the opposite. The outline starts with the basic...

  3. Stabilizing Sustainability

    DEFF Research Database (Denmark)

    Reitan Andersen, Kirsti

    The publication of the Brundtland Report in 1987 put the topic of sustainable development on the political and corporate agenda. Defining sustainable development as “a development that meets the needs of the future without compromising the ability of future generations to meet their own needs......” (WCED, 1987, p. 43), the Report also put a positive spin on the issue of sustainability by upholding capitalist beliefs in the possibility of infinite growth in a world of finite resources. While growth has delivered benefits, however, it has done so unequally and unsustainably. This thesis focuses...... on the textile and fashion industry, one of the world’s most polluting industries and an industry to some degree notorious for leading the ‘race to the bottom’ in global labour standards. Despite being faced with increasing demands to practise sustainability, most textile and fashion companies continue to fail...

  4. Microbial Electrolytic Capture, Separation and Regeneration of CO2 for Biogas Upgrading.

    Science.gov (United States)

    Jin, Xiangdan; Zhang, Yifeng; Li, Xiaohu; Zhao, Nannan; Angelidaki, Irini

    2017-08-15

    Biogas upgrading to natural gas quality is essential for the efficient use of biogas in various applications. Carbon dioxide (CO 2 ) which constitutes a major part of the biogas is generally removed by physicochemical methods. However, most of the methods are expensive and often present environmental challenges. In this study, an innovative microbial electrolytic system was developed to capture, separate and regenerate CO 2 for biogas upgrading without external supply of chemicals, and potentially to treat wastewater. The new system was operated at varied biogas flow rates and external applied voltages. CO 2 was effectively separated from the raw biogas and the CH 4 content in the outlet reached as high as 97.0 ± 0.2% at the external voltage of 1.2 V and gas flow rate of 19.6 mL/h. Regeneration of CO 2 was also achieved in the regeneration chamber with low pH (1.34 ± 0.04). The relatively low electric energy consumption (≤0.15 kWh/m 3 biogas) along with the H 2 production which can contribute to the energy input makes the overall energy need of the system low, and thereby makes the technology promising. This work provides the first attempt for development of a sustainable biogas upgrading technology and potentially expands the application of microbial electrochemical technologies.

  5. A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade

    CERN Document Server

    Liu, T; The ATLAS collaboration

    2011-01-01

    The current front-end electronics of the ATLAS Liquid Argon calorimeters need to be upgraded to sustain the higher radiation levels and data rates expected at the upgraded LHC machine (HL-LHC), which will have 5 times more luminosity than the LHC in its ultimate configuration. This upgrade calls for an optical link system of 100 Gbps per front-end board (FEB). A high speed, low power, radiation tolerant serializer is the critical component in this system. In this paper, we present the design and test results of a single channel 16:1 serializer and the design of a double-channel 16:1 serializer. Both designs are based on a commercial 0.25 μm silicon-on-sapphire CMOS technology. The single channel serializer consists of a serializing unit, a PLL clock generator and a line driver implemented in current mode logic (CML). The serializing unit multiplexes 16 bit parallel LVDS data into 1-bit width serial CMOS data. The serializing unit is composed of a cascade of 2:1 multiplexing circuits based on static D-flip-fl...

  6. Seeking Sustainability

    OpenAIRE

    Clive L. Spash

    2014-01-01

    What does sustainability research do to help the environment? One might well wonder when observing the annual conference season with various academics and professors in sustainability science, ecological economics or environmental ethics driving to the airport to fly off to international meetings to discuss how bad things are getting, what should been done about it, and how time is running out for action. In fact, singling out a few academic groups is highly unfair because the link between pr...

  7. Local Sustainability

    International Nuclear Information System (INIS)

    Carrizosa Umana, Julio

    1998-01-01

    The current polemic about the possibilities of sustainable development has led to a renovated interest for the topic of the sustainability of the communities and the local sustainability. In front of the global sustainability whose conditions have been exposed by systemic ecologists and for macro economists, the sustainability of specific places arises in the planet whose conditions are object of study of the ecology of landscapes, of the ecological economy, of the cultural anthropology, of the environmental sociology and naturally, of the integral environmentalism. In this discussion the Colombian case charges unusual interest to be one of the few countries of Latin America, where a very dense net of municipalities exists, each one with its urban helmet and with a position and some functions defined by the political constitution of the nation. This net of municipalities and of urban helmets it also constitutes net of alternative to the current macro-cephalic situation. As well as Bogota grew, in a hundred years, of less than a hundred thousand inhabitants to six million inhabitants, each one of these municipalities contains a potential of growth that depends on the characteristics of its ecological, social, economic and politic sustainability

  8. Sustainable markets for sustainable energy

    Energy Technology Data Exchange (ETDEWEB)

    Millan, J.; Smyser, C.

    1997-12-01

    The author discusses how the Inter-American Development Bank (IDB) is involved in sustainable energy development. It presently has 50 loans and grants for non conventional renewable energy projects and ten grants for efficiency programs for $600 and $17 million respectively, representing 100 MW of power. The IDB is concerned with how to create a sustainable market for sustainable energy projects. The IDB is trying to work with government, private sector, NGOs, trading allies, credit sources, and regulators to find proper roles for such projects. He discusses how the IDB is working to expand its vision and objectives in renewable energy projects in Central and South America.

  9. The CEBAF RF Separator System Upgrade

    International Nuclear Information System (INIS)

    Hovater, J.; Mark Augustine; Al Guerra; Richard Nelson; Robert Terrell; Mark Wissmann

    2004-01-01

    The CEBAF accelerator uses RF deflecting cavities operating at the third sub-harmonic (499 MHz) of the accelerating frequency (1497 MHz) to ''kick'' the electron beam to the experimental halls. The cavities operate in a TEM dipole mode incorporating mode enhancing rods to increase the cavity's transverse shunt impedance [1]. As the accelerators energy has increased from 4 GeV to 6 GeV the RF system, specifically the 1 kW solid-state amplifiers, have become problematic, operating in saturation because of the increased beam energy demands. Two years ago we began a study to look into replacement for the RF amplifiers and decided to use a commercial broadcast Inductive Output Tube (IOT) capable of 30 kW. The new RF system uses one IOT amplifier on multiple cavities as opposed to one amplifier per cavity as was originally used. In addition, the new RF system supports a proposed 12 GeV energy upgrade to CEBAF. We are currently halfway through the upgrade with three IOTs in operation and the remaining one nearly installed. This paper reports on the new RF system and the IOT performance

  10. Upgrading elastomer seals for nuclear service

    Energy Technology Data Exchange (ETDEWEB)

    Wittich, K C; Wensel, R; LaRose, R; Kuran, S

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs.

  11. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; LaRose, R.; Kuran, S.

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs

  12. Selected issues for the LHC luminosity upgrade

    International Nuclear Information System (INIS)

    Laface, E.

    2008-12-01

    The Large Hadron Collider started its operations on September 10. 2008. In a realistic forecast it is supposed to demonstrate (or confute) the existence of the Higgs boson for the year 2014. After this date the physics of rare events will be explored more in details and an upgrade of the luminosity can make an important difference in the program of experiments at CERN. This thesis proposes several ideas to increase the luminosity of ATLAS and CMS experiments and the acceptance of TOTEM experiment. The main object of study is the Interaction Region, that consists in the set of magnets in charge to provide the final beam focalization for the collisions. The Interaction Region is studied with the methods of beam optics and beam dynamics to design new layouts for the upgrade. These layouts are also explored from the point of view of integrability in the existing experiments developing the analysis of energy deposition and misalignment tolerances. This study was performed with the use of analytical methods for the general considerations and numerical methods for the parameters optimization. (author)

  13. The enhanced ASDEX Upgrade pellet centrifuge launcher

    Energy Technology Data Exchange (ETDEWEB)

    Plöckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-10-15

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  14. The enhanced ASDEX Upgrade pellet centrifuge launcher

    International Nuclear Information System (INIS)

    Plöckl, B.; Lang, P. T.

    2013-01-01

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios

  15. VVER 1000-NPP Temelin safety upgrading

    International Nuclear Information System (INIS)

    Fleischhans, J.; Ubra, O.

    1995-01-01

    A modernisation program upgrading Temelin plant to meet internationally adopted standard has been implemented during plant design and construction phases. The initial Czech-Russian design (primary system was of Russian design, secondary system was of Czech design) has been extensively modified and adapted to present western safety criteria and operational requirements. The goals are to achieve a high level of safety, reliability, availability and load-following ability. The load-following ability and response to grid frequency changes are very important for the Czech Republic, since the nuclear capacity represents a high proportion of the overall electrical system there. On the basis of IAEA OSART missions and Halliburton NUS audit results and in compliance with recommendations of The State Office for Nuclear Safety, Czech Power Company and Czech scientists and researchers a modernisation program project for Temelin has been carried out. It includes three main groups of VVER1000 MW unit innovations: - Modernization and upgrading of the safety and control systems. - Fuel replacement and modification of the reactor core. - Innovation of some components of the primary and secondary systems. The tenders for instrumentation and control system, nuclear fuel, diagnostic system and radiation monitoring system were issued to the world-well known suppliers. The US company Westinghouse Electric >Corporation (WEC) was selected to submit contract for the delivery of instrumentation and control system primary side diagnostic system and for the delivery of nuclear fuel. The contract was signed in 1993

  16. The Fast Interaction Trigger Upgrade for ALICE

    CERN Document Server

    Garcia-Solis, Edmundo

    2016-01-01

    The ALICE Collaboration is preparing a major detector upgrade for the second LHC long shutdown (2019–20). The LHC heavy-ion luminosity and collision rate from 2021 onwards will considerably exceed the design parameters of the present ALICE forward trigger detectors. Furthermore, the introduction of a new Muon Forward Tracker (MFT) will significantly reduce the space available for the upgraded trigger detectors. To comply with these conditions a Fast Interaction Trigger (FIT) has been designed. FIT will be the primary forward trigger, luminosity, and collision time measurement detector. The FIT will be capable of triggering at an interaction rate of 50 kHz, with a time resolution better than 30 ps, with 99% efficiency. It will also determine multiplicity, centrality, and reaction plane. FIT will consist of two arrays of Cherenkov radiators with MCP-PMT sensors and of a single, large-size scintillator ring. The arrays will be placed on both sides of the interaction point (IP). Because of the presence of the h...

  17. Upgrading of regulatory activities in Belarus

    International Nuclear Information System (INIS)

    Rozdyalovskaya, L.F.; Shabanov, V.V.

    1998-01-01

    Upgrading of the National regulatory regime in the Republic of Belarus started in fact in 1992 after the Interregional Nuclear and Radiation Safety Inspectorate had been established in the Gostekhnadzor of Belarus. In this connection, the Gostekhnadzor was transformed into the Gospromatomnadzor - the State Committee for Supervision of Industrial and Nuclear Safety. In 1993, by special decrees issued by the Council of Ministers the Gospromatomnadzor was designated a National Competent Body responsible for nuclear materials. Now the Committee is part of the Ministry for Emergencies. In the Committee, the issues of nuclear and radiation safety are dealt with by 6 departments among which the Department for Nuclear and Radiation Safety Regulation and the Interregional Nuclear and Radiation Safety inspectorate play major role. The created regulatory structure makes it possible to fully perform the control of situation at nuclear- and radiation-hazardous facilities and take adequate measures aimed at strengthening their safety. The priority directions of regulatory work by the Promatomnadzor include development and revision of regulations governing radiation and nuclear safety and upgrading of the training procedure to enhance the radiation safety and technical knowledge of the Promatomnadzor staff. (author)

  18. Readout of the upgraded ALICE-ITS

    Science.gov (United States)

    Szczepankiewicz, A.; ALICE Collaboration

    2016-07-01

    The ALICE experiment will undergo a major upgrade during the second long shutdown of the CERN LHC. As part of this program, the present Inner Tracking System (ITS), which employs different layers of hybrid pixels, silicon drift and strip detectors, will be replaced by a completely new tracker composed of seven layers of monolithic active pixel sensors. The upgraded ITS will have more than twelve billion pixels in total, producing 300 Gbit/s of data when tracking 50 kHz Pb-Pb events. Two families of pixel chips realized with the TowerJazz CMOS imaging process have been developed as candidate sensors: the ALPIDE, which uses a proprietary readout and sparsification mechanism and the MISTRAL-O, based on a proven rolling shutter architecture. Both chips can operate in continuous mode, with the ALPIDE also supporting triggered operations. As the communication IP blocks are shared among the two chip families, it has been possible to develop a common Readout Electronics. All the sensor components (analog stages, state machines, buffers, FIFOs, etc.) have been modelled in a system level simulation, which has been extensively used to optimize both the sensor and the whole readout chain design in an iterative process. This contribution covers the progress of the R&D efforts and the overall expected performance of the ALICE-ITS readout system.

  19. Readout of the upgraded ALICE-ITS

    International Nuclear Information System (INIS)

    Szczepankiewicz, A.

    2016-01-01

    The ALICE experiment will undergo a major upgrade during the second long shutdown of the CERN LHC. As part of this program, the present Inner Tracking System (ITS), which employs different layers of hybrid pixels, silicon drift and strip detectors, will be replaced by a completely new tracker composed of seven layers of monolithic active pixel sensors. The upgraded ITS will have more than twelve billion pixels in total, producing 300 Gbit/s of data when tracking 50 kHz Pb–Pb events. Two families of pixel chips realized with the TowerJazz CMOS imaging process have been developed as candidate sensors: the ALPIDE, which uses a proprietary readout and sparsification mechanism and the MISTRAL-O, based on a proven rolling shutter architecture. Both chips can operate in continuous mode, with the ALPIDE also supporting triggered operations. As the communication IP blocks are shared among the two chip families, it has been possible to develop a common Readout Electronics. All the sensor components (analog stages, state machines, buffers, FIFOs, etc.) have been modelled in a system level simulation, which has been extensively used to optimize both the sensor and the whole readout chain design in an iterative process. This contribution covers the progress of the R&D efforts and the overall expected performance of the ALICE-ITS readout system.

  20. MAPS development for the ALICE ITS upgrade

    Science.gov (United States)

    Yang, P.; Aglieri, G.; Cavicchioli, C.; Chalmet, P. L.; Chanlek, N.; Collu, A.; Gao, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Kim, D.; Kim, J.; Lattuca, A.; Marin Tobon, C. A.; Marras, D.; Mager, M.; Martinengo, P.; Mazza, G.; Mugnier, H.; Musa, L.; Puggioni, C.; Rousset, J.; Reidt, F.; Riedler, P.; Snoeys, W.; Siddhanta, S.; Usai, G.; van Hoorne, J. W.; Yi, J.

    2015-03-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips.

  1. Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    INSPIRE-00246160

    2015-05-20

    {During the Long Shutdown 2 (LS2) of the LHC in 2018/2019, the ALICE experiment plans the installation of a novel Inner Tracking System (ITS). The upgraded detector will fully replace the current ITS having six layers by seven layers of Monolithic Active Pixel Sensors (MAPS). The upgraded ITS will have significantly improved tracking and vertexing capabilities, as well as readout rate to cope with the expected increased Pb-Pb luminosity in LHC. The choice of MAPS has been driven by the specific requirements of ALICE as a heavy ion experiment dealing with rare probes at low $p_\\mathrm{T}$. This leads to stringent requirements on the material budget of 0.3$\\%~X/X_{0}$ per layer for the three innermost layers. Furthermore, the detector will see large hit densities of $\\sim 19~\\mathrm{cm}^{-2}/\\mathrm{event}$ on average for minimum-bias events in the inner most layer and has to stand moderate radiation loads of 700 kRad TID and $1\\times 10^{13}$ 1 MeV n$_\\mathrm{eq}/\\mathrm{cm}^{2}$ NIEL at maximum. The MAPS dete...

  2. Readout of the upgraded ALICE-ITS

    Energy Technology Data Exchange (ETDEWEB)

    Szczepankiewicz, A., E-mail: Adam.Szczepankiewicz@cern.ch [CERN, Geneva (Switzerland); Institute of Computer Science, Warsaw University of Technology, Warsaw (Poland)

    2016-07-11

    The ALICE experiment will undergo a major upgrade during the second long shutdown of the CERN LHC. As part of this program, the present Inner Tracking System (ITS), which employs different layers of hybrid pixels, silicon drift and strip detectors, will be replaced by a completely new tracker composed of seven layers of monolithic active pixel sensors. The upgraded ITS will have more than twelve billion pixels in total, producing 300 Gbit/s of data when tracking 50 kHz Pb–Pb events. Two families of pixel chips realized with the TowerJazz CMOS imaging process have been developed as candidate sensors: the ALPIDE, which uses a proprietary readout and sparsification mechanism and the MISTRAL-O, based on a proven rolling shutter architecture. Both chips can operate in continuous mode, with the ALPIDE also supporting triggered operations. As the communication IP blocks are shared among the two chip families, it has been possible to develop a common Readout Electronics. All the sensor components (analog stages, state machines, buffers, FIFOs, etc.) have been modelled in a system level simulation, which has been extensively used to optimize both the sensor and the whole readout chain design in an iterative process. This contribution covers the progress of the R&D efforts and the overall expected performance of the ALICE-ITS readout system.

  3. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; Larose, R.; Kuran, S.

    1998-01-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussion with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author)

  4. Development of upgraded brown coal process

    Energy Technology Data Exchange (ETDEWEB)

    Komatsu, N.; Sugita, S.; Deguchi, T.; Shigehisa, T.; Makino, E. [Kobe Steel Ltd., Hyogo (Japan). Coal and Energy Project Department

    2004-07-01

    Half of the world's coal resources are so-called low rank coal (LRC) such as lignite, subbituminous coal. Utilization of such coal is limited due to low heat value and high propensity of spontaneous combustion. Since some of LRCs have advantages as clean coal, i.e. low ash and low sulfur content, LRC can be the excellent feedstock for power generation and metallurgy depending on the upgrading technology. The UBC (upgraded brown coal) process introduced here converts LRC to solid fuel with high heat value and less propensity of self-heating. Various world coals, such as Australian, Indonesian and USA LRC, were tested using the Autoclave and Bench Scale Unit, and the process application to LRC of wide range is proven. The R & D activities of the UBC process are introduced including a demonstration project with a 5 ton/day test plant in progress in Indonesia, expecting near future commercialisation in order to utilize abundant LRC of clean properties. 8 refs., 12 figs., 3 tabs.

  5. Physical design of JT-60 Super Upgrade

    International Nuclear Information System (INIS)

    Nagashima, K.; Kikuchi, M.; Kurita, G.; Ozeki, T.; Aoyagi, T.; Ushigusa, K.; Neyatani, Y.; Kubo, T.; Mori, K.; Nakagawa, S.; Kuriyama, M.; Nagami, M.

    1997-01-01

    The JT-60 Super Upgrade (JT-60SU) is an upgraded tokamak device of JT-60U for developing the steady-state reactor and advanced tokamak operation in the International Thermonuclear Experimental Reactor. The device is planned to utilize the JT-60 facilities fully and to minimize the needed modification. The major radius is 4.8 m and the maximum plasma current is 10 MA. Neutral beam injection with 750 keV beam energy is the primary heating method. The machine is capable of steady-state operation with high density up to 8.8 x 10 19 m -3 at 5 MA plasma current. The high operating density, over the Greenwald et al. limit, is critically important in order to achieve high bootstrap current fraction. Ballooning mode and low n ideal magnetohydrodynamic (MHD) mode including the bootstrap current were analyzed for steady-state operation. The current profile must be optimized to obtain a normalized beta up to 3. The plasma configuration with high triangularity was adopted in order to get good MHD stability and high energy confinement. A compact divertor was designed in order to get the large plasma space. (orig.)

  6. Vermont Yankee simulator BOP model upgrade

    International Nuclear Information System (INIS)

    Alejandro, R.; Udbinac, M.J.

    2006-01-01

    The Vermont Yankee simulator has undergone significant changes in the 20 years since the original order was placed. After the move from the original Unix to MS Windows environment, and upgrade to the latest version of SimPort, now called MASTER, the platform was set for an overhaul and replacement of major plant system models. Over a period of a few months, the VY simulator team, in partnership with WSC engineers, replaced outdated legacy models of the main steam, condenser, condensate, circulating water, feedwater and feedwater heaters, and main turbine and auxiliaries. The timing was ideal, as the plant was undergoing a power up-rate, so the opportunity was taken to replace the legacy models with industry-leading, true on-line object oriented graphical models. Due to the efficiency of design and ease of use of the MASTER tools, VY staff performed the majority of the modeling work themselves with great success, with only occasional assistance from WSC, in a relatively short time-period, despite having to maintain all of their 'regular' simulator maintenance responsibilities. This paper will provide a more detailed view of the VY simulator, including how it is used and how it has benefited from the enhancements and upgrades implemented during the project. (author)

  7. Upgrading the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Popeneciu, G; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at LHC. Around 2023, after the upgrade of the LHC (High Luminosity LHC, phase 2) the peak luminosity will increase by a factor of 5 compared to the design value (1034 cm-2 s-1), thus requiring an upgrade of the TileCal readout electronics. Except the 9852 photomultipliers (PMTs), most of the on- and off-detector electronics will be replaced, with the aim of digitizing all PMT pulses at 40 MHz at the front-end level and sending them with 10 Gbps optical links to the back-end electronics. Moreover, to increase reliability, redundancy will be introduced at different levels. Three different options are currently being investigated for the front-end electronics and extensive test beam studies are planned to select the best option. One demonstrator prototype module is also planned to be inserted in TileCal in 2014 that will include hybrid electronic components able to probe the new design, but still compatible with the presen...

  8. UPGRADE OF THE CENTRAL WEB SERVERS

    CERN Multimedia

    WEB Services

    2000-01-01

    During the weekend of the 25-26 March, the infrastructure of the CERN central web servers will undergo a major upgrade.As a result, the web services hosted by the central servers (that is, the services the address of which starts with www.cern.ch) will be unavailable Friday 24th, from 17:30 to 18:30, and may suffer from short interruptions until 20:00. This includes access to the CERN top-level page as well as the services referenced by this page (such as access to the scientific program and events information, or training, recruitment, housing services).After the upgrade, the change will be transparent to the users. Expert readers may however notice that when they connect to a web page starting with www.cern.ch this address is slightly changed when the page is actually displayed on their screen (e.g. www.cern.ch/Press will be changed to Press.web.cern.ch/Press). They should not worry: this behaviour, necessary for technical reasons, is normal.web.services@cern.chTel 74989

  9. MAPS development for the ALICE ITS upgrade

    International Nuclear Information System (INIS)

    Yang, P.; Gao, C.; Huang, G.; Aglieri, G.; Cavicchioli, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Tobon, C.A. Marin; Mager, M.; Martinengo, P.; Chalmet, P.L.; Chanlek, N.; Collu, A.; Marras, D.; Kim, D.; Kim, J.; Lattuca, A.

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm 2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips

  10. The upgrade of the HAWC observatory

    Energy Technology Data Exchange (ETDEWEB)

    Schoorlemmer, Harm [Max-Plank-Institut fuer Kernphysik, Heidelberg (Germany); Collaboration: HAWC-Collaboration

    2016-07-01

    The High Altitude Water Cherenkov (HAWC) high-energy gamma-ray observatory has recently been completed near the Sierra Negra volcano in central Mexico. HAWC consists of 300 Water Cherenkov Detectors, each containing 200 tons of purified water, that cover a total surface area of 20,000 m{sup 2}. HAWC observes gamma rays in the 0.1-100 TeV range and has a sensitivity to TeV-scale gamma-ray sources an order of magnitude better than previous air-shower arrays. The HAWC trigger for the highest energy gamma rays reaches an effective area of 10{sup 5} m{sup 2} but many of them are poorly reconstructed because the shower core falls outside the array. An upgrade that increases the present fraction of well reconstructed showers above 10 TeV by a factor of 3-4 can be done with a sparse outrigger array of small water Cherenkov detectors that pinpoint the core position and by that improve the angular resolution of the reconstructed showers. Such an outrigger array would be of the order of 300 small water Cherenkov detectors of 2.5 m{sup 3} placed over an area four times larger than HAWC. The Max Planck Institute fuer Kernphysik in Heidelberg just joined the collaboration and will provide the FADC electronics for the readout of the outrigger tanks. Detailed simulations are being performed to optimize the performance of the upgrade.

  11. Silicon sensor technologies for ATLAS IBL upgrade

    CERN Document Server

    Grenier, P; The ATLAS collaboration

    2011-01-01

    New pixel sensors are currently under development for ATLAS Upgrades. The first upgrade stage will consist in the construction of a new pixel layer that will be installed in the detector during the 2013 LHC shutdown. The new layer (Insertable-B-Layer, IBL) will be inserted between the inner most layer of the current pixel detector and the beam pipe at a radius of 3.2cm. The expected high radiation levels require the use of radiation hard technology for both the front-end chip and the sensor. Two different pixel sensor technologies are envisaged for the IBL. The sensor choice will occur in July 2011. One option is developed by the ATLAS Planar Pixel Sensor (PPS) Collaboration and is based on classical n-in-n planar silicon sensors which have been used for the ATLAS Pixel detector. For the IBL, two changes were required: The thickness was reduced from 250 um to 200 um to improve the radiation hardness. In addition, so-called "slim edges" were designed to reduce the inactive edge of the sensors from 1100 um to o...

  12. APS Storage Ring Monopulse RF BPM Upgrade

    Science.gov (United States)

    Lill, R.; Pietryla, A.; Norum, E.; Lenkszus, F.

    2004-11-01

    The Advanced Photon Source (APS) is a third-generation synchrotron light source in its ninth year of operation. The storage ring monopulse radio frequency (rf) beam position monitor (BPM) was designed to measure single-turn and multi-turn beam positions for operations and machine physics studies. Many of the components used in the original design are obsolete and costly to replace. In this paper we present a proposal to upgrade the monopulse rf BPMs in which the existing system hardware is repartitioned and the aging data acquisition system is replaced. By replacing only the data acquisition system, we will demonstrate a cost-effective approach to improved beam stability, reliability, and enhanced postmortem capabilities. An eight-channel ADC/digitizer VXI board with sampling rate of up to 105 MHz (per channel) and 14-bit resolution coupled with a field-programmable gate array and embedded central processing will provide the flexibility to revitalize this system for another decade of operation. We will discuss the upgrade system specifications, design, and prototype test results.

  13. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  14. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  15. Shielding for the upgraded duke free electron laser laboratory

    International Nuclear Information System (INIS)

    Vylet, V.

    2005-01-01

    The Duke FEL Laboratory is undergoing a series of upgrades staggered over time that will greatly increase the capabilities of the machines and by the same token the importance of radiation safety issues. In this paper, we present the scope of the planned upgrades and provide several specific examples of shielding calculations. We also present our effort to correlate calculations with experimental measurements. (authors)

  16. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    International Nuclear Information System (INIS)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-01-01

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures

  17. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  18. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R.; Biddy, M.; Jones, S.

    2013-03-01

    This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

  19. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  20. Rapid urbanisation and slum upgrading : what can land surveyors do?

    NARCIS (Netherlands)

    van der Molen, P.

    2015-01-01

    This paper aims at understanding the domain of rapid urbanisation and slum upgrading. Therefore it collects facts in order to clarify the status quo. The paper highlights relevant aspects, such as development of new forms of spatial planning, modern slum upgrading methods, provision of security to

  1. Cuba: Juragua NPP. Upgrades. Modifications and improvements. Annex 5A

    International Nuclear Information System (INIS)

    Gonzales Aguilera, H.

    1999-01-01

    This annex deals with upgrades - modifications and improvements. Planning for resumption of work at Juragua NPP is under way, and a strategic plan of upgrades and modifications has been prepared. The proposed improvements were categorized, reviewed by the regulatory body and generally approved. This annex outlines the format of the plan. (author)

  2. The CDF II eXtremely fast tracker upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abulencia, A.; Azzurri, P.; Cochran, E.; Dittmann, J.; Donati, S.; Efron, J.; Erbacher, R.; Errede, D.; Fedorko, I.; Flanagan, G.; Forrest, R.; /Illinois U., Urbana

    2006-09-01

    The CDF II Extremely Fast Tracker is the trigger track processor which reconstructs charged particle tracks in the transverse plane of the CDF II central outer tracking chamber. The system is now being upgraded to perform a three dimensional track reconstruction. A review of the upgrade is presented here.

  3. Towards Optimum Material Choices for HL-LHC Collimator Upgrade

    CERN Document Server

    Quaranta, E.; Biancacci, N.; Bruce, R.; Carra, F.; Métral, E.; Redaelli, S.; Rossi, A.; Salvant, B.

    2016-01-01

    properties that address different limitations of the present collimation system, solutions have been found to fulfil various upgrade challenges. This paper describes the proposed staged approach to deploy new materials in the upgraded HL-LHC collimation system. Beam tests at the CERN HiRadMat facility were also performed to benchmark simulation methods and constitutive material models.

  4. Upgrade of the ALICE muon trigger electronics

    International Nuclear Information System (INIS)

    Dupieux, P; Joly, B; Jouve, F; Manen, S; Vandaële, R

    2014-01-01

    The ALICE muon trigger is a large scale detector based on single gap bakelite RPCs. An upgrade of the electronics is needed in order to withstand the increase of luminosity after the LHC Long Shutdown-2 in 2018-2019. The detector will be read out at the minimum bias rate of 100 kHz in Pb–Pb collisions (including a safety factor of 2), two orders of magnitude above the present design. For the most exposed RPCs and in the present conditions of operation, the total integrated charge could be as high as 100 mC/cm 2 with rates up to 100 Hz/cm 2 , which is above the present limit for safe operation. In order to overcome these limitations, upgrade projects of the Front-End (FE) and Readout Electronics are scheduled. The readout upgrade at high rate with low dead time requires changing most of the present electronics. It involves a new design for the 234 Local cards receiving the LVDS signals from the FE electronics and the 16 Regional concentrator cards. The readout chain is completed by a single Common Readout Unit developed for most ALICE sub-detectors. The new architecture of the muon trigger readout will be briefly presented. The present FE electronics, designed for the streamer mode, must be replaced to prevent ageing of the RPCs in the future operating conditions. The new FE called FEERIC (for Front-End Electronics Rapid Integrated Circuit) will have to perform amplification of the analog input signals. This will allow for RPC operation in a low-gain avalanche mode, with a much smaller charge deposit (factor 3-5) in the detector as compared to the present conditions. The purpose is to discriminate RPC signals with a charge threshold around 100 fC, in both polarities, and with a time jitter below 1 ns. We will describe the FE card and FEERIC ASIC features and first prototype performance, report on test results obtained on a cosmic test bench and discuss ongoing developments

  5. Roundtabling Sustainability

    DEFF Research Database (Denmark)

    Ponte, Stefano

    2014-01-01

    councils’ and ‘sustainability roundtables’ and have been designed around a set of institutional features seeking to establish legitimacy, fend off possible criticism, and ‘sell’ certifications to potential users. The concept of ‘roundtabling’ emphasizes the fitting a variety of commodity...... and procedures to meet ‘good practice’ in standard setting and management. This is opening space for competing initiatives that are less democratic, quicker, and more aligned with industry interests to establish substantial presence in the market for sustainability certifications. These tend to more easily...

  6. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  7. Experiences in controlling the upgrading of TRIGA 2000 Bandung reactor

    International Nuclear Information System (INIS)

    Huda, K.; Wibowo, Y.W.; Suprawhardana, M.S.

    2001-01-01

    TRIGA 2000 Bandung Reactor was established in 1961 for research, education and isotope production purposes. The reactor reached its first criticality in October 1964 and operated at nominal power of 250 kW until 1971. In 1971 the reactor was upgraded to the power level of 1000 kW. In order to raise the capacity of isotope production, the reactor has been upgraded again to the power level of 2000 kW. During the modification of the reactor, the Center for Research and Development of Nuclear Techniques (CRDNT) was management of the reactor as it faced many problems, either technical or non-technical ones. This caused the upgrading activities to take a long time. At this time, the reactor upgrading has almost finished, and the nuclear commissioning is going on. Several aspects and problems associated with the upgrading process have been reviewed and the results are discussed in the present paper. (author)

  8. Analysis of Energy Industry Upgrading in Northeast China

    Science.gov (United States)

    Liu, Xiao-jing; Ji, Yu-liang; Guan, Bai-feng; Jing, Xin

    2018-02-01

    Promoting regional economic growth and realizing the transformation of the mode of economic growth are in industrial upgrading essence The product is a carrier that represents a series of links of production, management and marketing behind the enterprise, and is a comprehensive reflection of the knowledge and ability of a country or region. Based on the industrial spatial structure, this paper visualizes the industrial space in Northeast China from 2005 to 2015, analyzes the comparative advantages of the energy industry in Northeast China, and examines the status quo of the upgrade of the energy industry according to the industrial upgrading status. Based on the industrial spatial structure, Industry intensity in the industrial space, put forward the future direction of the energy industry upgrade and upgrade path.

  9. Fitting partially upgraded oils into pipelines and refinery markets

    International Nuclear Information System (INIS)

    Flaherty, G.

    2000-01-01

    The logistics of transporting partially upgraded crudes in feeder and trunk pipeline systems is discussed. Logistic alternatives are evaluated against economic drivers for partial upgrading, and the impact of crude transportation logistics on the quality of crude that reaches refinery gates is assessed. The potential advantages of partial upgrading in the field are reviewed (including reduction of diluent required to meet pipeline density and viscosity specifications, cost and availability of diluent, limitations in diluent transportation infrastructure, increased chemical stability, increased attractiveness to refineries, shortage of refinery coking capacity, higher market value). The pros and cons of various upgrading processes, and the implications of each for producers and refiners are explained. The advantages of moving to large common streams, as opposed to the concept of 'boutique' crudes, are stressed as the surest way for producers to realize the maximum value of partially upgraded crudes

  10. Experiences From Developing and Upgrading a Web-Based Surveillance System for Malaria Elimination in Cambodia.

    Science.gov (United States)

    Fu, Clementine; Lopes, Sérgio; Mellor, Steve; Aryal, Siddhi; Sovannaroth, Siv; Roca-Feltrer, Arantxa

    2017-06-14

    Strengthening the surveillance component is key toward achieving country-wide malaria elimination in Cambodia. A Web-based upgraded malaria information system (MIS) was deemed to essentially act as the central component for surveillance strengthening. New functionality (eg, data visualization) and operational (eg, data quality) attributes of the system received particular attention. However, building from the lessons learned in previous systems' developments, other aspects unique to Cambodia were considered to be equally important; for instance, feasibility issues, particularly at the field level (eg, user acceptability at various health levels), and sustainability needs (eg, long-term system flexibility). The Cambodian process of identifying the essential changes and critical attributes for this new information system can provide a model for other countries at various stages of the disease control and elimination continuum. Sharing these experiences not only facilitates the establishment of "best practices" but also accelerates global and regional malaria elimination efforts. In this article, Cambodia's experience in developing and upgrading its MIS to remain responsive to country-specific needs demonstrates the necessity for considering functionality, operationalization, feasibility, and sustainability of an information system in the context of malaria elimination. ©Clementine Fu, Sérgio Lopes, Steve Mellor, Siddhi Aryal, Siv Sovannaroth, Arantxa Roca-Feltrer. Originally published in JMIR Public Health and Surveillance (http://publichealth.jmir.org), 14.06.2017.

  11. Thermal ions dilution and ITG suppression in ASDEX Upgrade ion ITBs

    International Nuclear Information System (INIS)

    Tardini, G.; Hobirk, J.; Igochine, V.G.; Maggi, C.F.; Martin, P.; McCune, D.; Peeters, A.G.; Sips, A.C.C.; Staebler, A.; Stober, J.

    2007-01-01

    Internal transport barriers (ITBs) in the ion channel in the tokamak ASDEX Upgrade allow for high energy confinement but collapse after only several energy confinement times. In this paper we show that in most cases the ITB phase is terminated clearly before the first ELM burst, thereby ruling out the ELMs as the main trigger of the ITB collapse. For the first time, the ITB formation and sustainment are found to be associated with a mechanism of transport suppression based on thermal ions dilution by the injected fast ions. Interestingly, such ITBs do not require reversed magnetic shear. The linear growth rate of the ion temperature gradient driven mode is computed as a function of the fast ion fraction with gyrokinetic stability analysis. Monte Carlo simulations predict the fast ion population to be above the gyrokinetic critical fraction in a region consistent with the experimental ITB width. The density threshold documented for the onset of ASDEX Upgrade ion ITBs is explained. The role of T i /T e and of the plasma sheared rotation for ITB sustainment are analysed. The stabilization mechanism presented here is consistent with the observed ITB lifetime of the order of the beam slowing down time. A possible runaway mechanism leading to ITB collapse is described. Finally, the relevance of this particular ITB scheme for ITER is discussed

  12. Upgrading the TFTR Transrex Power Supplies

    International Nuclear Information System (INIS)

    Lawson, J.E.; Marsala, R; Ramakrishnan, S.; Zhao, X.; Sichta, P.

    2009-01-01

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the 'Hardwired Control System' will be replaces with a Programmable Logic Controller (PLC)

  13. Upgrade of the Nuclotron power supply

    International Nuclear Information System (INIS)

    Karpinskij, V.N.; Kondrat'ev, N.G.; Osipenkov, A.L.

    2010-01-01

    One of topics of the Nuclotron development is the modification of its power supply scheme and upgrade of the energy evacuation system aimed to provide long and safe operation of the Nuclotron at the dipole magnetic field up to 2 T. It is necessary for the Nuclotron operation as a part of injection chain of the heavy ion collider under design at JINR as well as for fulfillment of its current scientific program. In the report the structure and peculiarity of the existing power supply system are described. The existing system is based on separated supply of dipole magnets and quadrupole lenses. General goals of the power supply modification are described, structural and principal schemes of the power supply, control system and the schemes of the energy evacuation key are presented

  14. US utility I ampersand C upgrade initiative

    International Nuclear Information System (INIS)

    Wilkinson, D.

    1993-01-01

    This paper describes an initiative which is being pursued to address the problems associated with the increasing obsolescence of instrumentation and control (I ampersand C) systems in nuclear power plants. Such efforts will improve safety, availability, and reliability of plant operation. The program presented is a joint plan between EPRI, utilities, and vendors, to bring about the development of technology to meet these needs, to encourage the private sector to develop such technology, and to prove to utilities the value and utility in applying such technology to upgrade their facilities. Part of this plan is demonstration programs where plant-wide sensor and I ampersand C improvements can be implemented, in a documented manner, to provide R ampersand D information on their performance, functionality, and reliability. The intent is to reduce the costs and shorten the learning curve associated with the utilization of modern I ampersand C equipment

  15. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  16. D OE upgrade muon electronics design

    International Nuclear Information System (INIS)

    Baldin, B.; Green, D.; Haggerty, H.; Hansen, S.

    1994-11-01

    The planned luminosity for the upgrade is ten times higher than at present (L ∼ 10 32 cm -2 s -1 ) and involves a time between collisions as small as 132 ns. To operate in this environment, completely new electronics is required for the 17,500 proportional drift tubes of the system. These electronics include a deadtimeless readout, a digital TDC with about 1 ns binning for the wire signals, fast charge integrators and pipelined ADCs for digitizing the pad electrode signals, a new wire signal triggering scheme and its associated trigger logic, and high level DSP processing. Some test results of measurements performed on prototype channels and a comparison with the existing electronics are presented

  17. The upgraded LTP-V at SLS

    Energy Technology Data Exchange (ETDEWEB)

    Flechsig, U., E-mail: uwe.flechsig@psi.ch [Paul Scherrer Institut, Swiss Light Source, 5232 Villigen-PSI (Switzerland); Jaggi, A.; Krempaský, J.; Spielmann, S.; Thominet, V. [Paul Scherrer Institut, Swiss Light Source, 5232 Villigen-PSI (Switzerland)

    2013-05-11

    Since 2005 the Swiss Light Source (SLS) has been operating a Long Trace Profiler (LTP)-V from Ocean Optics in its metrology laboratory to measure the synchrotron optics for SLS. In 2012 we finished a significant upgrade to improve the accuracy, reliability and measurement efficiency in particular for the calibration of adaptive optics. Folding mirrors with figure errors <λ/100 and an additional linear encoder have been installed, the 1d CCD detector with 2048 pixels has been replaced by a 16 mega-pixel CCD camera with gigabit ethernet interface GigE, the monolithic software has been replaced by a modular, full- EPICS compatible system based on a new LTP plugin for the areaDetector software for image processing. The plugin allows slope determination in real time i.e. per frame.

  18. Big advance towards the LHC upgrade

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    The LHC is currently the world’s most powerful accelerator. With its technical achievements it has already set world records. However, big science looks very far ahead in time and is already preparing already for the LHC’s magnet upgrade, which should involve a 10-fold increase of the collision rates toward the end of the next decade. The new magnet technology involves the use of an advanced superconducting material that has just started to show its potential.   The first Long Quadrupole Shell (LQS01) model during assembly at Fermilab. The first important step in the qualification of the new technology for use in the LHC was achieved at the beginning of December when the US LHC Accelerator Research Program (LARP) – a consortium of Brookhaven National Laboratory, Fermilab, Lawrence Berkeley National Laboratory and the SLAC National Accelerator Laboratory founded by US Department Of Energy (DOE) in 2003 – successfully tested the first long focussing magnet th...

  19. Superconducting Cavity Development for the CEBAF Upgrade

    International Nuclear Information System (INIS)

    I.E. Campisi; J.R. Delayen; L.R. Doolittle; P.Kneisel; J. Mammosser; L. Phillips

    1999-01-01

    Long-term plans for CEBAF at Jefferson Lab call for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule, capable of providing more than twice the operating voltage of the existing CEBAF modules within the same length, is being developed. In particular, this requires the development of superconducting cavities capable of consistently operating at gradients above 12 MV/m and Q approximately 10 10 . We have engaged in a complete review of all the processes and procedures involved in the fabrication and assembly of cavities, and are modifying our chemical processing, cleaning, and assembly facilities. While we have retained the cell shape of existing CEBAF cavities, the new superconducting structure will be substantially different in several respects, such as the higher-order-modes damping and the fundamental power coupling systems. Design features and experimental results will be presented

  20. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.

    2006-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(reg s ign) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  1. PEP-II Transverse Feedback Electronics Upgrade

    CERN Document Server

    Weber, Jonah; Chin, Michael; Doolittle, Lawrence

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx® ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  2. Frequency tuning of the CEBAF upgrade cavities

    International Nuclear Information System (INIS)

    J.R. Delayen; L. Doolittle; E. Feldl; V. Nguyen; W. Sachleben

    1999-01-01

    Long-term plans for CEBAF at Jefferson Lab calls for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule capable of providing more than twice the voltage of the existing ones is under development. One requirement is to operate the superconducting cavities, which are 40% longer than existing ones, at 2.5 times the original design gradient with the same amount of rf power. This puts stringent requirements on the accuracy of the frequency tuner: range of 400 kHz and resolution of 1 Hz. A new tuner design to meet these requirements is under development. This system avoids problem areas of previous designs by holding to the principles of not placing moving parts in the vacuum and/or low temperature space, and of having all drive components readily accessible for maintenance and replacement without cryomodule warm-up

  3. QPS Upgrade and Re-commissioning

    CERN Document Server

    Denz, R

    2009-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting devices QPS will be submitted to a substantial upgrade. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets. The presentation will describe the design and implementation of the new protection layers and report on recent tests with prototype devices. It will address as well the planned steps for commissioning of the new system, possible limitations and the additional tools and procedures required to make use of its full capability. Finally the recent progress with respect to procurement, production, test and installation will be presented.

  4. Upgrading the Fast Calorimeter Simulation in ATLAS

    CERN Document Server

    Schaarschmidt, Jana; The ATLAS collaboration

    2017-01-01

    The tremendous need for simulated samples now and even more so in the future, encourage the development of fast simulation techniques. The Fast Calorimeter Simulation is a faster though less accurate alternative to the full calorimeter simulation with Geant4. It is based on parametrizing the longitudunal and lateral energy deposits of single particles in the ATLAS calorimeter. Principal component analysis and machine learning techniques are used to improve the performance and decrease the memory need compared to the current version of the ATLAS Fast Calorimeter Simulation. The parametrizations are expanded to cover very high energies and very forward detector regions, to increase the applicability of the tool. A prototype of this upgraded Fast Calorimeter Simulation has been developed and first validations with single particles show substantial improvements over the previous version.

  5. The halo current in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Pautasso, G.; Giannone, L.; Gruber, O.; Herrmann, A.; Maraschek, M.; Schuhbeck, K.H.

    2011-01-01

    Due to the complexity of the phenomena involved, a self-consistent physical model for the prediction of the halo current is not available. Therefore the ITER specifications of the spatial distribution and evolution of the halo current rely on empirical assumptions. This paper presents the results of an extensive analysis of the halo current measured in ASDEX Upgrade with particular emphasis on the evolution of the halo region, on the magnitude and time history of the halo current, and on the structure and duration of its toroidal and poloidal asymmetries. The effective length of the poloidal path of the halo current in the vessel is found to be rather insensitive to plasma parameters. Large values of the toroidally averaged halo current are observed in both vertical displacement events and centred disruptions but last a small fraction of the current quench; they coincide typically with a large but short-lived MHD event.

  6. The halo current in ASDEX Upgrade

    Science.gov (United States)

    Pautasso, G.; Giannone, L.; Gruber, O.; Herrmann, A.; Maraschek, M.; Schuhbeck, K. H.; ASDEX Upgrade Team

    2011-04-01

    Due to the complexity of the phenomena involved, a self-consistent physical model for the prediction of the halo current is not available. Therefore the ITER specifications of the spatial distribution and evolution of the halo current rely on empirical assumptions. This paper presents the results of an extensive analysis of the halo current measured in ASDEX Upgrade with particular emphasis on the evolution of the halo region, on the magnitude and time history of the halo current, and on the structure and duration of its toroidal and poloidal asymmetries. The effective length of the poloidal path of the halo current in the vessel is found to be rather insensitive to plasma parameters. Large values of the toroidally averaged halo current are observed in both vertical displacement events and centred disruptions but last a small fraction of the current quench; they coincide typically with a large but short-lived MHD event.

  7. Plans and status of the LHCb upgrade

    CERN Document Server

    Szumlak, Tomasz

    2017-01-01

    LHCb (Large Hadron Collider beauty) is a high precision experiment dedicated to searching for New Physics beyond the Standard Model in the heavy flavour sector. Since LHCb is optimised to perf orm indirect studies and is sensitive to mass scales potentially larger than the LHC energy it is playing a key role in broad searches for New Physics phenomena. This expectation is supported by many intriguing anomalies, especially related to rare decays and lepton flavour universality, observed and reported by LHCb. Thus, it is essential for LHCb to enter the high luminosity phase and continue data taking beyond LHC Long Shutdown 2 (LS2). The LHCb experimental setup will undergo a major upgrade that is be ing planned for the LHC Run 3. Here we will discuss selected aspects of this project.

  8. Insertion Device Upgrade Plans at the NSLS

    CERN Document Server

    Tanabe, Toshiya; Harder, David; Lehecka, Michael; Rakowsky, George; Skaritka, John

    2005-01-01

    This paper describes plans to upgrade insertion devices at the National Synchrotron Light Source (NSLS), Brookhaven National Laboratory, U.S.A. The aging wiggler (W80) at X25 is being replaced by a 1 m long in-vacuum mini-gap undulator (MGU-18) optimized for a dedicated macromolecular crystallography program. A new, 1/3 m long, in-vacuum undulator (MGU-13.5), will be installed between a pair of RF cavities at X9, and will serve a new beamline dedicated for small angle x-ray scattering (SAXS). Both MGU’s will have provision for cryocooling the NdFeB hybrid arrays to 150K to raise the field and K-value and to obtain better spectral coverage. Design issues of the devices and other considerations, especially magnetic measurement methods in low temperature will be discussed.

  9. A solid tungsten divertor for ASDEX Upgrade

    International Nuclear Information System (INIS)

    Herrmann, A; Greuner, H; Jaksic, N; Böswirth, B; Maier, H; Neu, R; Vorbrugg, S

    2011-01-01

    The conceptual design of a solid tungsten divertor for ASDEX Upgrade (AUG) is presented. The Div-III design is compatible with the existing divertor structure. It re-establishes the energy and heat receiving capability of a graphite divertor and overcomes the limitations of tungsten coatings. In addition, a solid tungsten divertor allows us to investigate erosion and bulk deuterium retention as well as test castellation and target tilting. The design criteria as well as calculations of forces due to halo and eddy currents are presented. The thermal properties of the proposed sandwich structure are calculated with finite element method models. After extensive testing of a target tile in the high heat flux test facility GLADIS, two solid tungsten tiles were installed in AUG for in-situ testing.

  10. Upgrade of the LHCb ECAL monitoring system

    CERN Document Server

    Guz, Yu

    2015-01-01

    The LHCb ECAL is a shashlik calorimeter of 6016 cells, covering 7.68 x 6.24 m$^2$ area. To monitor the readout chain of each ECAL cell, the LHCb ECAL is equipped with a LED based monitoring system. During the LHC Run I (2009-2012) it was found that the precision of the monitoring suffers from the radiation degradation of transparency of polystyrene clear fibers used to transport the LED light to the ECAL photomultipliers. In order to improve the performance of the monitoring system, and especially in view of significant increase of LHCb working luminosity foreseen after 2018, the present plastic fibers have been replaced by radiation hard quartzfi bers. The performance of the old LHCb ECAL monitoring system during LHC Run I and the design of the upgraded system are discussed here.

  11. Online track processor for the CDF upgrade

    International Nuclear Information System (INIS)

    Thomson, E. J.

    2002-01-01

    A trigger track processor, called the eXtremely Fast Tracker (XFT), has been designed for the CDF upgrade. This processor identifies high transverse momentum (> 1.5 GeV/c) charged particles in the new central outer tracking chamber for CDF II. The XFT design is highly parallel to handle the input rate of 183 Gbits/s and output rate of 44 Gbits/s. The processor is pipelined and reports the result for a new event every 132 ns. The processor uses three stages: hit classification, segment finding, and segment linking. The pattern recognition algorithms for the three stages are implemented in programmable logic devices (PLDs) which allow in-situ modification of the algorithm at any time. The PLDs reside on three different types of modules. The complete system has been installed and commissioned at CDF II. An overview of the track processor and performance in CDF Run II are presented

  12. The UA1 upgrade calorimeter trigger processor

    International Nuclear Information System (INIS)

    Bains, M.; Charleton, D.; Ellis, N.; Garvey, J.; Gregory, J.; Jimack, M.P.; Jovanovic, P.; Kenyon, I.R.; Baird, S.A.; Campbell, D.; Cawthraw, M.; Coughlan, J.; Flynn, P.; Galagedera, S.; Grayer, G.; Halsall, R.; Shah, T.P.; Stephens, R.; Biddulph, P.; Eisenhandler, E.; Fensome, I.F.; Landon, M.; Robinson, D.; Oliver, J.; Sumorok, K.

    1990-01-01

    The increased luminosity of the improved CERN Collider and the more subtle signals of second-generation collider physics demand increasingly sophisticated triggering. We have built a new first-level trigger processor designed to use the excellent granularity of the UA1 upgrade calorimeter. This device is entirely digital and handles events in 1.5 μs, thus introducing no dead time. Its most novel feature is fast two-dimensional electromagnetic cluster-finding with the possibility of demanding an isolated shower of limited penetration. The processor allows multiple combinations of triggers on electromagnetic showers, hadronic jets and energy sums, including a total-energy veto of multiple interactions and a full vector sum of missing transverse energy. This hard-wired processor is about five times more powerful than its predecessor, and makes extensive use of pipelining techniques. It was used extensively in the 1988 and 1989 runs of the CERN Collider. (orig.)

  13. Siemens tasks and activities during gradual upgrading

    International Nuclear Information System (INIS)

    Kuehne, B.

    2001-01-01

    The gradual upgrading of NPP V1 Bohunice constitutes the most extensive reconstruction project to be performed in an operational WWER plant to date. It constitutes a milestone in Siemens co-operation on projects for WWERs to date and is an encouraging example for the successful combination of western and eastern safety cultures. During the runtime of this project Siemens learnt very much about the 'complete function' as well as the details of this WWER plant type. In contrast the Slovakian partners really gained a much better understanding for the western approach to ensure safety, for the most modern safety technology, in particular for instrumentation and control, and last but not least or advanced project management. (author)

  14. Environmental Upgrading in Global Value Chains

    DEFF Research Database (Denmark)

    Poulsen, René Taudal; Ponte, Stefano; Sornn-Friese, Henrik

    2018-01-01

    Ports are crucial hubs in the functioning of the global economy, and maritime transport is a major emitter of air pollutants. Ports have considerable potential for promoting environmental upgrading in maritime transport and along global value chains more generally, but so far have been only...... partially successful in doing so. We examine results, limitations and future potential of voluntary initiatives that have been carried out by selected European and North American port authorities, which are considered frontrunners in environmental management. Drawing from the insights of global value chain...... their organizational and physical boundaries: by lowering tool implementation complexity through stronger collaboration within global value chains; and by enhancing emission visibility through alliances with cargo-owners and regulators....

  15. The UA1 upgrade calorimeter trigger processor

    International Nuclear Information System (INIS)

    Bains, N.; Baird, S.A.; Biddulph, P.

    1990-01-01

    The increased luminosity of the improved CERN Collider and the more subtle signals of second-generation collider physics demand increasingly sophisticated triggering. We have built a new first-level trigger processor designed to use the excellent granularity of the UA1 upgrade calorimeter. This device is entirely digital and handles events in 1.5 μs, thus introducing no deadtime. Its most novel feature is fast two-dimensional electromagnetic cluster-finding with the possibility of demanding an isolated shower of limited penetration. The processor allows multiple combinations of triggers on electromagnetic showers, hadronic jets and energy sums, including a total-energy veto of multiple interactions and a full vector sum of missing transverse energy. This hard-wired processor is about five times more powerful than its predecessor, and makes extensive use of pipelining techniques. It was used extensively in the 1988 and 1989 runs of the CERN Collider. (author)

  16. Review of current and proposed reactor upgrades

    International Nuclear Information System (INIS)

    Moon, R.M.

    1985-01-01

    In an effort to foresee the future health of neutron scattering, a survey of plans to upgrade reactors and associated experimental facilities was undertaken. The results indicate that we are now entering a period characterized by a substantial reinvestment in reactor sources and expansion in the number of neutron scattering instruments. For the group of institutions participating in this survey there will be a total investment in improved sources and experimental facilities of $500 M to $1,000 M over the next decade. This investment will result in a 30 to 40% increase in the total power of research reactors and an increase of 30 to 50% in the number of neutron scattering instruments. It is therefore reasonable to anticipate an approximate doubling in the number of reactor neutrons incident on samples in the mid 90s compared to the present

  17. Silicon strip detectors for the ATLAS upgrade

    CERN Document Server

    Gonzalez Sevilla, S; The ATLAS collaboration

    2011-01-01

    The Large Hadron Collider at CERN will extend its current physics program by increasing the peak luminosity by one order of magnitude. For ATLAS, one of the two general-purpose experiments of the LHC, an upgrade scenario will imply the complete replacement of its internal tracker due to the harsh conditions in terms of particle rates and radiation doses. New radiation-hard prototype n-in-p silicon sensors have been produced for the short-strip region of the future ATLAS tracker. The sensors have been irradiated up to the fluences expected in the high-luminous LHC collider. This paper summarizes recent results on the performance of the irradiated n-in-p detectors.

  18. Integrated Instrumentation and Control Upgrade Plan

    International Nuclear Information System (INIS)

    Wilkinson, D.; Sun, B.; Wray, L.; Smith, J.

    1992-02-01

    This document presents the first industry-wide integrated research and development plan to support upgrading instrumentation and control (I ampersand C) systems in nuclear power plants in the United States. The plan encompasses both solving obsolescence problems and introducing modern I ampersand C technology into the industry. Accomplishing this plan will provide the technological base to modernize existing plants, as well as bridge the gap to meet Advanced Light Water Reactor (ALWR) requirements for modern I ampersand C systems. This plan defines Research and Development tasks to meet the identified needs for the following technical elements: Instrumentation, Control and Protection, Man-Machine Support Systems, Maintenance, Communications, Verification and Validation, and Specifications and Standards

  19. Upgrading the ATLAS Tile Calorimeter Electronics

    Directory of Open Access Journals (Sweden)

    Carrió Fernando

    2013-11-01

    Full Text Available This work summarizes the status of the on-detector and off-detector electronics developments for the Phase 2 Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2022. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in the middle of 2014 during the first Long Shutdown. For the on-detector readout, three different front-end boards (FEB alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The Main Board will provide communication and control to the FEBs and the Daughter Board will transmit the digitized data to the off-detector electronics in the counting room, where the super Read-Out Driver (sROD will perform processing tasks on them and will be the interface to the trigger levels 0, 1 and 2.

  20. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2014-01-01

    This presentation summarizes the status of the on-detector and off-detector electronics developments for the Phase II Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2024. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in middle 2014 during the Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The MainBoard will provide communication and control to the FEBs and the DaughterBoard will transmit the digitized data to the off-detector electronics in the counting room, where the sROD will perform processing tasks on them.

  1. Upgrading the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2013-01-01

    This work summarizes the status of the on-detector and off-detector electronics developments for the Phase II Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2022. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in middle 2014 during the Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The MainBoard will provide communication and control to the FEBs and the DaughterBoard will transmit the digitized data to the off-detector electronics in the counting room, where the sROD will perform processing tasks on them.

  2. CDF End Plug calorimeter Upgrade Project

    International Nuclear Information System (INIS)

    Apollinari, G.; de Barbaro, P.; Mishina, M.

    1994-01-01

    We report on the status of the CDF End Plug Upgrade Project. In this project, the CDF calorimeters in the end plug and the forward regions will be replaced by a single scintillator based calorimeter. After an extensive R ampersand D effort on the tile/fiber calorimetry, we have now advanced to a construction phase. We review the results of the R ampersand D leading to the final design of the calorimeters and the development of tooling devised for this project. The quality control program of the production of the electromagnetic and hadronic calorimeters is described. A shower maximum detector for the measurement of the shower centroid and the shower profile of electrons, γ and π 0 has been designed. Its performance requirements, R ampersand D results and mechanical design are discussed

  3. Physics design of the upgraded TREAT reactor

    International Nuclear Information System (INIS)

    Bhattacharyya, S.K.; Lell, R.M.; Liaw, J.R.; Ulrich, A.J.; Wade, D.C.; Yang, S.T.

    1980-01-01

    With the deferral of the Safety Test Facility (STF), the TREAT Upgrade (TU) reactor has assumed a lead role in the US LMFBR safety test program for the foreseeable future. The functional requirements on TU require a significant enhancement of the capability of the current TREAT reactor. A design of the TU reactor has been developed that modifies the central 11 x 11 fuel assembly array of the TREAT reactor such as to provide the increased source of hard spectrum neutrons necessary to meet the functional requirements. A safety consequence of the increased demands on TU is that the self limiting operation capability of TREAT has proved unattainable, and reliance on a safety grade Plant Protection System is necessary to ensure that no clad damage occurs under postulated low-probability reactivity accidents. With that constraint, the physics design of TU provides a means of meeting the functional requirements with a high degree of confidence

  4. Injector upgrade for the S-DALINAC

    Energy Technology Data Exchange (ETDEWEB)

    Kuerzeder, Thorsten; Brunken, Marco; Conrad, Jens; Eichhorn, Ralf; Graef, Hans-Dieter; Richter, Achim; Sievers, Sven [Institut fuer Kernphysik, TU Darmstadt (Germany); Ackermann, Wolfgang; Mueller, Wolfgang F.O.; Steiner, Bastian; Weiland, Thomas [Institut fuer Theorie Elektromagnetischer Felder, TU Darmstadt (Germany); Fuerst, Joel [Argonne National Laboratory, Argonne (United States)

    2009-07-01

    The injector section of the S-DALINAC currently delivers beams of up to 10 MeV w ith a current of up to 60{mu}A. The upgrade aims to increase both parameters to 14 MeV and 150{mu}A in order to allow more demanding experiments. Therefor e, a modified cryostat module equipped with two new cavities is required. Due to an increase in rf power to 2 kW the old coaxial rf input couplers, being design ed for a maximum power of 500 W, have to be replaced by new waveguide couplers. We review the design principles and report on the fabrication of the cavities an d the whole module.

  5. Sustained growth but non-sustainable urbanisation in Penang, Malaysia.

    Science.gov (United States)

    Fold, N; Wangel, A

    1998-05-01

    Penang, Malaysia, has been a city characterized by urban growth and rapid industrialization for the past 25 years. Foreign capital, especially from the transnational electronics industry, has spurred the process of urban growth in the city. While the state government is clearly trying to copy and adapt some form of a Singapore model of development and growth in Penang, the quantitative and qualitative demands for labor exceed the available supply from the country's northern states. Local and national labor policies are decided without the involvement of trade unions, which lack the strength to substantially improve wages or influence the institutions of the labor market. Therefore, an energized labor market attempts to balance the upgrading of skills and the control of wages. Focus upon sustainable urbanization will renew the debate on urban, export-oriented industrialization in southeast Asia.

  6. Major upgrades of the high frequency B-dot probe diagnostic suite on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Ochoukov Roman

    2017-01-01

    Full Text Available The high frequency B-dot (HFB probe diagnostic on the ASDEX Upgrade tokamak has undergone a considerable upgrade during the 2016 opening of the torus. The probe coverage is now greatly expanded toroidally, as well as radially with the addition of probes on the high field side and the removable manipulator head. A new 2-channel fast digitizer now allows to examine and record radio frequency (RF wave emissions emanating from the plasma in the ion cyclotron range of frequencies (ICRF. Possible studies that can be achieved now include: a study of core ICRF power absorption efficiency; a study of ion cyclotron emissions from the plasma generated by energetic ions; and study of ICRF wave/plasma turbulence interactions in the scrape-off layer region.

  7. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  8. Upgrading nuclear material protection, control and accounting in Russia

    International Nuclear Information System (INIS)

    Caravelli, Jack; Behan, Chris; Fishbone, Les

    2001-01-01

    focus on implementation of the upgrades at the Russian nuclear sites, and on certain national or infrastructure areas: Regulatory Development; Training; Physical Inventory Taking and Material Balance; Computerized Material Accounting and Control; Bar Coding; Nondestructive Assay Measurements; Bulk (Weight and Volume) Measurements; Tamper-Indicating Devices; Nuclear Material Pedestrian Portal Monitors; Access Control; Building Hardening; Federal Information System. III. Results - To date, after more than six years of work, significant progress has been achieved in a variety of ways. For example: Security improvements are underway on some 750 metric tons of highly enriched uranium and plutonium at many sites under the supervision of Minatom, Gosatomnadzor, the Russian Navy, and other Russian entities. Among these are an ingenious concrete-block delay system for plutonium storage at the Mayak Production Association and an inventory strategy at the Institute of Physics and Power Engineering that, by fostering the consolidation of items, reduces the time required to inventory them. About 850 kg of HEU have been converted to low-enriched uranium in a project that is now active at two processing sites; More than 1000 Russian MPC and A staff have undergone training at the Russian Methodological and Training Center; and Hardening of more than 90 transport vehicles has enhanced transport security. We will illustrate this progress in the paper by describing the MPC and A upgrade work at specific Russian sites. IV. Discussion - During its existence, the MPC and A Program has confronted several problems. They include issues surrounding taxation, exports, travel, assurances, and business practice. Most have been overcome, but sometimes only after long and sustained effort. Positive results have been achieved because of the mutual desire of the United States and Russia to address the need for enhanced nuclear material protection, control and accounting at Russian nuclear sites. Yet

  9. Active carbon catalyst for heavy oil upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Fukuyama, Hidetsugu; Terai, Satoshi [Technology Research Center, Toyo Engineering Corporation, 1818 Azafujimi, Togo, Mobara-shi, Chiba 297-00017 (Japan); Uchida, Masayuki [Business Planning and Exploring Department, Overseas Business Development and Marketing Division, Toyo Engineering Corporation, 2-8-1 Akanehama, Narashino-shi, Chiba 275-0024 (Japan); Cano, Jose L.; Ancheyta, Jorge [Maya Crude Treatment Project, Instituto Mexicano del Petroleo, Eje Central Lazaro Cardenas No. 152, Col. San Bartolo Atepehuacan, Mexico D.F. 07730 (Mexico)

    2004-11-24

    The active carbon (AC) catalyst was studied by hydrocracking of Middle Eastern vacuum residue (VR) for heavy oil upgrading. It was observed that the active carbon has the affinity to heavy hydrocarbon compounds and adsorption selectivity to asphaltenes, and exhibits better ability to restrict the coke formation during the hydrocracking reaction of VR. The mesopore of active carbon was thought to play an important role for effective conversion of heavy hydrocarbon compounds into lighter fractions restricting carbon formation. The performance of the AC catalyst was examined by continuous hydrocracking by CSTR for the removal of such impurities as sulfur and heavy metals (nickel and vanadium), which are mostly concentrated in the asphaltenes. The AC catalyst was confirmed to be very effective for the removal of heavy metals from Middle Eastern VR, Maya/Istmo VR and Maya VR. The extruded AC catalysts were produced by industrial manufacturing method. The application test of the extruded AC catalyst for ebullating-bed reactor as one of the commercially applicable reactors was carried out at the ebullating-bed pilot plant for 500h. The ebullition of the extruded AC catalyst was successfully traced and confirmed by existing {gamma}-ray density meter. The extruded AC catalyst showed stable performance with less sediment formation at an equivalent conversion by conventional alumina catalyst at commercial ebullating-bed unit. The degradation of the AC catalyst at the aging test was observed to be less than that of the conventional alumina catalyst. Thus, the AC catalyst was confirmed to be effective and suitable for upgrading of heavy oil, especially such heavy oils as Maya, which contains much heavy metals.

  10. Upgraded HFIR Fuel Element Welding System

    International Nuclear Information System (INIS)

    Sease, John D.

    2010-01-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  11. Upgrading safety systems of industrial irradiation facilities

    International Nuclear Information System (INIS)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L.; Thomé, Z.D.

    2017-01-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  12. The DIII-D cryogenic system upgrade

    International Nuclear Information System (INIS)

    Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

    1993-10-01

    The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 ell/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed

  13. A Neutral Beam Injector Upgrade for NSTX

    International Nuclear Information System (INIS)

    Stevenson, T.; McCormack, B.; Loesser, G.D.; Kalish, M.; Ramakrishnan, S.; Grisham, L.; Edwards, J.; Cropper, M.; Rossi, G.; Halle, A. von; Williams, M.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current

  14. Upgrading activities for the HFR Petten

    International Nuclear Information System (INIS)

    Ahlf, J.

    1990-01-01

    The HFR in Petten, the Netherlands, is a water cooled and moderated research reactor. It has been in continuous and successful operation for more than 25 years. The reactor is utilized as a multi-purpose research reactor with a predominance of materials testing for fission and fusion energy. It has been continuous policy to keep the installation up to date by implementing technical developments and by refurbishing or replacing all components and equipment which approach the end of their useful life. In addition the facilities and the ancillary experimental equipment are continuously adapted and kept versatile in view of changing requirements from the experimental programmes. Performance upgrading comprised increasing the power in two steps to 30 MW and now 45 MW, accompanied by improving the core loading pattern in order to provide an increasing number of high flux irradiation positions. These improvements were rendered possible because of achievements in fuel element design and manufacture. In the mid 70's it became apparent that embrittlement of the reactor vessel material would become a licensing problem. A decision was taken to replace the old vessel by a new one which then could take into account recent experience with respect to experimental requirements. After the vessel replacement a programme was started to replace other ageing components. The primary heat exchangers and the pool heat exchanger have been replaced recently; replacement of the beryllium reflector is nearly finished. All the nuclear instrumentation channels have been replaced. Repair or refurbishment of peripheral equipment such as the outlet line for secondary cooling, the guaranteed power supply for the reactor and the fire prevention system is under preparation. Because all upgrading actions were carefully planned well in advance of actual component failures, unanticipated outages could be avoided

  15. Upgrading safety systems of industrial irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L., E-mail: rogeriog@cnen.gov.br, E-mail: jlopes@cnen.gov.br, E-mail: evaldo@cnen.gov.br, E-mail: mara@cnen.gov.br [Comissão Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil). Diretoria de Radioproteção e Segurança Nuclear; Thomé, Z.D., E-mail: zielithome@gmail.com [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil). Seção de Engenharia Nuclear

    2017-07-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  16. The DIII-D cryogenic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

    1993-10-01

    The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 {ell}/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed.

  17. A large divertor manipulator for ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Herrmann, Albrecht, E-mail: albrecht.herrmann@ipp.mpg.de; Jaksic, Nikola; Leitenstern, Peter; Greuner, Henri; Krieger, Karl; Marné, Pascal de; Oberkofler, Martin; Rohde, Volker; Schall, Gerd

    2015-10-15

    Highlights: • A large divertor manipulator for ASDEX Upgrade is developed and tested. • It allows replacing a relevant part of the divertor by dedicated targets and probes. • Modified solid standard targets. • Electrical and mechanical probes for dedicated investigations. • Test of actively cooled component. - Abstract: In 2013 a new bulk tungsten divertor, Div-III, was installed in ASDEX Upgrade (AUG). During the concept and design phase of Div-III the option of adaptable divertor instrumentation and divertor modification as contribution for divertor investigations in preparation of ITER was given a high priority. To gain flexibility for the test of divertor modifications without affecting the operational space of AUG, the large divertor manipulator, DIM-II, was designed and installed. DIM-II allows to retract 2 out of 128 outer divertor target tiles including the water cooled support structure into a target exchange box and to replace these targets without breaking the vacuum of the AUG vessel. DIM-II is based on a carriage-rail system with a driving rod pushing a front-end with the target module into the divertor position for plasma operation. Three types of front-ends are foreseen for physics investigations: (i) modified standard targets clamped to the standard cooling structure, (ii) dedicated front-ends making use of the whole available volume of about 230 × 160 × 80 mm{sup 3} and (iii) actively cooled/heated targets for cooling water temperatures up to 230 °C. This paper presents the DIM-II design including the FEM calculations for the modified divertor support structure and the front-end options, as well as the test procedure and operation mode.

  18. Sustainable resilience in property maintenance: encountering changing weather conditions

    DEFF Research Database (Denmark)

    Cox, Rimante Andrasiunaite; Nielsen, Susanne Balslev

    2014-01-01

    Purpose: The purpose of the study is to develop a methodological approach for project management to integrate sustainability and resilience planning in property maintenance as an incremental strategy for upgrading existing properties to meet new standards for sustainable and climate resilient...... buildings. Background: Current maintenance practice is focused on the technical standard of buildings, with little consideration of sustainability and resilience. There is a need to develop tools for incorporating sustainable resilience into maintenance planning. Approach: The study is primarily theoretical......, developing the concept of sustainable resilience for changing weather conditions Results: The paper suggests a decision support methodology that quantifies sustainable resilience for the analytical stages of property maintenance planning. Practical Implications: The methodology is generic and expected users...

  19. Upgrades and Real Time Ntm Control Application of the Ece Radiometer on Asdex Upgrade

    Science.gov (United States)

    Hicks, N. K.; Suttrop, W.; Behler, K.; Giannone, L.; Manini, A.; Maraschek, M.; Raupp, G.; Reich, M.; Sips, A. C. C.; Stober, J.; Treutterer, W.; ASDEX Upgrade Team; Cirant, S.

    2009-04-01

    The 60-channel electron cyclotron emission (ECE) radiometer diagnostic on the ASDEX Upgrade tokamak is presently being upgraded to include a 1 MHz sampling rate data acquisition system. This expanded capability allows electron temperature measurements up to 500 kHz (anti-aliasing filter cut-off) with spatial resolution ~1 cm, and will thus provide measurement of plasma phenomena on the MHD timescale, such as neoclassical tearing modes (NTMs). The upgraded and existing systems may be run in parallel for comparison, and some of the first plasma measurements using the two systems together are presented. A particular planned application of the upgraded radiometer is integration into a real-time NTM stabilization loop using targeted deposition of electron cyclotron resonance heating (ECRH). For this loop, it is necessary to determine the locations of the NTM and ECRH deposition using ECE measurements. As the magnetic island of the NTM repeatedly rotates through the ECE line of sight, electron temperature fluctuations at the NTM frequency are observed. The magnetic perturbation caused by the NTM is independently measured using Mirnov coils, and a correlation profile between these magnetic measurements and the ECE data is constructed. The phase difference between ECE oscillations on opposite sides of the island manifests as a zero-crossing of the correlation profile, which determines the NTM location in ECE channel space. To determine the location of ECRH power deposition, the power from a given gyrotron may be modulated at a particular frequency. Correlation analysis of this modulated signal and the ECE data identifies a particular ECE channel associated with the deposition of that gyrotron. Real time equilibrium reconstruction allows the ECE channels to be translated into flux surface and spatial coordinates for use in the feedback loop.

  20. Sustainable finance

    NARCIS (Netherlands)

    Boersma-de Jong, Margreet F.

    2012-01-01

    Presentation for Springschool of Strategy, University of Groningen, 10 October 2012. The role of CSR is to stimulate ethical behaviour, and as a result, mutual trust in society. Advantage of CSR for the company and the evolution of CSR. From CSR to Sustainable Finance: how does CSR influence

  1. Sustainable Procurement

    DEFF Research Database (Denmark)

    Telles, Pedro; Ølykke, Grith Skovgaard

    2017-01-01

    and within it how sustainable requirements have increased the level of compliance required, particularly regulatory compliance. Compliance was already present in previous EU public procurement frameworks, but its extent on Directive 2014/24/EU leads the authors to consider the current legal framework...

  2. Exergy sustainability.

    Energy Technology Data Exchange (ETDEWEB)

    Robinett, Rush D. III (.; ); Wilson, David Gerald; Reed, Alfred W.

    2006-05-01

    Exergy is the elixir of life. Exergy is that portion of energy available to do work. Elixir is defined as a substance held capable of prolonging life indefinitely, which implies sustainability of life. In terms of mathematics and engineering, exergy sustainability is defined as the continuous compensation of irreversible entropy production in an open system with an impedance and capacity-matched persistent exergy source. Irreversible and nonequilibrium thermodynamic concepts are combined with self-organizing systems theories as well as nonlinear control and stability analyses to explain this definition. In particular, this paper provides a missing link in the analysis of self-organizing systems: a tie between irreversible thermodynamics and Hamiltonian systems. As a result of this work, the concept of ''on the edge of chaos'' is formulated as a set of necessary and sufficient conditions for stability and performance of sustainable systems. This interplay between exergy rate and irreversible entropy production rate can be described as Yin and Yang control: the dialectic synthesis of opposing power flows. In addition, exergy is shown to be a fundamental driver and necessary input for sustainable systems, since exergy input in the form of power is a single point of failure for self-organizing, adaptable systems.

  3. Sustainable Buildings

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Elle, Morten

    The scientific community agrees that: all countries must drastically and rapidly reduce their CO2 emissions and that energy efficient houses play a decisive role in this. The general attitude at the workshop on Sustainable Buildings was that we face large and serious climate change problems...

  4. Sustainable Entrepreneurship

    DEFF Research Database (Denmark)

    Schaltegger, Stefan; Beckmann, Markus; Hockerts, Kai

    2018-01-01

    . We also explore the transformation path of the case company, which starts with simple use and then moves to the feedback to core business pattern. By drawing on insights from lead user theory in innovation management and sustainable entrepreneurship, we ground the new concept in extant literature...

  5. Sustainable machining

    CERN Document Server

    2017-01-01

    This book provides an overview on current sustainable machining. Its chapters cover the concept in economic, social and environmental dimensions. It provides the reader with proper ways to handle several pollutants produced during the machining process. The book is useful on both undergraduate and postgraduate levels and it is of interest to all those working with manufacturing and machining technology.

  6. Sustainable processing

    DEFF Research Database (Denmark)

    Kristensen, Niels Heine

    2004-01-01

    Kristensen_NH and_Beck A: Sustainable processing. In Otto Schmid, Alexander Beck and Ursula Kretzschmar (Editors) (2004): Underlying Principles in Organic and "Low-Input Food" Processing - Literature Survey. Research Institute of Organic Agriculture FiBL, CH-5070 Frick, Switzerland. ISBN 3-906081-58-3...

  7. Architecture Sustainability

    NARCIS (Netherlands)

    Avgeriou, Paris; Stal, Michael; Hilliard, Rich

    2013-01-01

    Software architecture is the foundation of software system development, encompassing a system's architects' and stakeholders' strategic decisions. A special issue of IEEE Software is intended to raise awareness of architecture sustainability issues and increase interest and work in the area. The

  8. Sustainable development

    International Nuclear Information System (INIS)

    Boiteux, M.

    2004-01-01

    Marcel Boiteux evokes the results of the work on the sustainable development by the Academie des Sciences Morales et Politiques. This is a vast political programme with the goal of allowing all humanity to live well in growing unity while protecting the environment and favouring economic growth. (author)

  9. Sustainable Development

    African Journals Online (AJOL)

    Tsegai Berhane Ghebretekle

    Ethiopia is selected as a case study in light of its pace in economic growth ... Interrogating the Economy-First Paradigm in 'Sustainable Development' … 65 .... agreement, since such effective global cooperation on climate change ultimately ..... and foster innovation; reduce inequality within and among countries; make cities.

  10. Sustainable Soesterkwartier

    NARCIS (Netherlands)

    Abrahams, H.; Goosen, H.; Jong, de F.; Sickmann, J.; Prins, D.

    2010-01-01

    The municipality of Amersfoort wants to construct an endurable and sustainable eco-town in the Soesterkwartier neighbourhood, by taking future climate change into account. The impact of climate change at the location of the proposed eco-town was studied by a literature review.

  11. Sustainable Sizing.

    Science.gov (United States)

    Robinette, Kathleen M; Veitch, Daisy

    2016-08-01

    To provide a review of sustainable sizing practices that reduce waste, increase sales, and simultaneously produce safer, better fitting, accommodating products. Sustainable sizing involves a set of methods good for both the environment (sustainable environment) and business (sustainable business). Sustainable sizing methods reduce (1) materials used, (2) the number of sizes or adjustments, and (3) the amount of product unsold or marked down for sale. This reduces waste and cost. The methods can also increase sales by fitting more people in the target market and produce happier, loyal customers with better fitting products. This is a mini-review of methods that result in more sustainable sizing practices. It also reviews and contrasts current statistical and modeling practices that lead to poor fit and sizing. Fit-mapping and the use of cases are two excellent methods suited for creating sustainable sizing, when real people (vs. virtual people) are used. These methods are described and reviewed. Evidence presented supports the view that virtual fitting with simulated people and products is not yet effective. Fit-mapping and cases with real people and actual products result in good design and products that are fit for person, fit for purpose, with good accommodation and comfortable, optimized sizing. While virtual models have been shown to be ineffective for predicting or representing fit, there is an opportunity to improve them by adding fit-mapping data to the models. This will require saving fit data, product data, anthropometry, and demographics in a standardized manner. For this success to extend to the wider design community, the development of a standardized method of data collection for fit-mapping with a globally shared fit-map database is needed. It will enable the world community to build knowledge of fit and accommodation and generate effective virtual fitting for the future. A standardized method of data collection that tests products' fit methodically

  12. Commercialization of sustainable energy technologies

    International Nuclear Information System (INIS)

    Balachandra, P.; Kristle Nathan, Hippu Salk; Reddy, B. Sudhakara

    2010-01-01

    Commercialization efforts to diffuse sustainable energy technologies (SETs) have so far remained as the biggest challenge in the field of renewable energy and energy efficiency. Limited success of diffusion through government driven pathways urges the need for market based approaches. This paper reviews the existing state of commercialization of SETs in the backdrop of the basic theory of technology diffusion. The different SETs in India are positioned in the technology diffusion map to reflect their slow state of commercialization. The dynamics of SET market is analysed to identify the issues, barriers and stakeholders in the process of SET commercialization. By upgrading the 'potential adopters' to 'techno-entrepreneurs', the study presents the mechanisms for adopting a private sector driven 'business model' approach for successful diffusion of SETs. This is expected to integrate the processes of market transformation and entrepreneurship development with innovative regulatory, marketing, financing, incentive and delivery mechanisms leading to SET commercialization. (author)

  13. Criteria for prioritization of sites and determining upgrades

    International Nuclear Information System (INIS)

    Ek, David

    2001-01-01

    Full text: Several factors influence the decision to provide physical protection assistance. These factors include the relative attractiveness of the material with respect to nuclear proliferation, the state of the current physical protection system, and the financial resources available to the member state to support the physical protection system. However, identifying, collecting, and evaluating this information from which to make decisions is not a straightforward task. It requires that a relationship and forum be established through which physical protection system information can be shared. Once there is agreement on the need to share PPS information, a more formal evaluation of the effectiveness of the existing system can be performed. The evaluation should be conducted using performance-based criteria as well as INFCIRC/225/Rev. 4 recommendations. The evaluation should take into consideration the material to be protected, the state's design basis threat, and the ability of the existing security system to detect, assess, delay, and respond to an attack by adversaries. A limited review of the internal threat to material should also be performed to ensure appropriate measures are in place to protect material. Analysis tools for this evaluation would include limited computer models, tabletop timeline assessments, and subject matter expert review of specific elements of the protection system. Once the effectiveness of an security system is understood, recommendations for specific upgrades can be discussed with the member state to determine the most viable improvements to the system considering issues such as operational needs, cost, potential reduction in risk to material, and sustainability of the system in future years. To date, the primary mechanism in place for establishing a relationship and forum of information exchange has been the IAEA IPPAS program and other US Bilateral agreements with respect to US origin material. The experience gained through these

  14. Upgrade of the Annular Core Pulse Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Reuscher, J A [Sandia Laboratories, Albuquerque, NM (United States)

    1976-07-01

    The Annular Core Pulse Reactor (ACPR) is a TRIGA type reactor which has been in operation at Sandia Laboratories since 1967. The reactor is utilized in a wide variety of experimental programs which include radiation effects, neutron radiography, activation analysis, and fast reactor safety. During the past two years, the ACPR has become an important experimental facility for the United States Fast Reactor Safety Research Program and questions of interest to the safety of the LMFBR are being addressed. In order to enhance the capabilities of the ACPR for reactor safety experiments, a project to improve the performance of the reactor was initiated. It is anticipated that the pulse fluence can be increased by a factor of 2.0 to 2.5 by utilizing a two-region core concept with high heat capacity fuel elements around the central irradiation cavity. In addition, the steady-state power of the reactor will be increased by about a factor of two. Preliminary studies have identified several potential approaches to the ACPR performance improvement. The most promising approach appears to be the two-region core concept. The inner region, surrounding the irradiation cavity, would consist of a high-heat capacity fuel capable of absorbing the fission energy associated with a large nuclear pulse. The number of fissions occurring near the cavity would be greatly increased which, in turn, would significantly increase the fluence in the cavity. The outer region would consist of a U-ZrH fuel to provide an overall negative temperature coefficient for the two region core. Two candidate high heat capacity fuels [(BeO-UO{sub 2} and UC-ZrC) - graphite] are under consideration. Since this reactor upgrade represents a modification to an existing facility, it can be achieved in a relatively short time. It is anticipated that most of the existing reactor structure can be used for the upgrade. The present core occupies about one-half of the location in the grid plate. The high-heat capacity fuel

  15. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  16. Upgrade of Instrumentation for Purdue Reactor PUR-1

    International Nuclear Information System (INIS)

    Revankar, S.T.; Merritt, E.; Bean, R.

    2000-01-01

    The major objective of this program was to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective two projects on instrument upgrade were implemented. The first one was to convert the vacuum tube control and safety amplifiers (CSA) to solid state electronics, and the other was to upgrade the electrical and electronic shielding. This report is the annual report and gives the efforts and progress achieved on these two projects from July 1999 to June 2000

  17. Seismic assessment and upgrading of Paks nuclear power plant

    International Nuclear Information System (INIS)

    Tamas, K.

    2001-01-01

    A comprehensive programme for seismic assessment and upgrading is currently in progress at Hungary's Paks NPP. The re-evaluation of the site seismic hazard had been already completed. The technology of safe shut down and heat removal is established and the systems and structures relevant for seismic safety are identified. A seismic instrumentation is installed. The pre-earthquake preparedness and post-earthquake actions are elaborated. The methods for seismic capacity assessment are selected. The seismic capacity evaluation and the design of upgrading measures are currently in progress. The easy to perform upgrading covering the most urgent measures had been already performed. (author)

  18. Final Report: ATLAS Phase-2 Tracker Upgrade Layout Task Force

    CERN Document Server

    Clark, A; The ATLAS collaboration; Hessey, N; Mättig, P; Styles, N; Wells, P; Burdin, S; Cornelissen, T; Todorov, T; Vankov, P; Watson, I; Wenig, S

    2012-01-01

    he mandate of the Upgrade Layout Task Force was to develop a benchmark layout proposal for the ATLAS Phase-2 Upgrade Letter of Intent (LOI), due in late 2012. The work described in this note has evolved from simulation and design studies made using an earlier "UTOPIA" upgrade tracker layout, and experience gained from the current ATLAS Inner Detector during the first years of data taking. The layout described in this document, called the LoI-layout, will be used as a benchmark layout for the LoI and will be used for simulation and engineering studies described in the LoI.

  19. Industrial Clusters and Social Upgrading in Developing Countries

    DEFF Research Database (Denmark)

    Pyke, Frank; Lund-Thomsen, Peter

    In this article, we explore the relationship between industrial clusters and social upgrading in developing countries. Our article focuses on the hitherto little-considered influence of the economic and regulatory environment on the social upgrading of a cluster and on its governance system....... In doing so, we develop an analytical framework that seeks to explain how the enabling environment and different actors in cluster governance can either facilitate and/or hinder the process of social upgrading in cluster settings in developing countries. Finally, the conclusion outlines our main findings...

  20. Integrated oil production and upgrading using molten alkali metal

    Science.gov (United States)

    Gordon, John Howard

    2016-10-04

    A method that combines the oil retorting process (or other process needed to obtain/extract heavy oil or bitumen) with the process for upgrading these materials using sodium or other alkali metals. Specifically, the shale gas or other gases that are obtained from the retorting/extraction process may be introduced into the upgrading reactor and used to upgrade the oil feedstock. Also, the solid materials obtained from the reactor may be used as a fuel source, thereby providing the heat necessary for the retorting/extraction process. Other forms of integration are also disclosed.

  1. Phase 1 upgrade of the CMS forward hadronic calorimeter

    CERN Document Server

    Noonan, Daniel Christopher

    2017-01-01

    The CMS experiment at the Large Hadron Collider at CERN is upgrading the photo- detection and readout system of the forward hadronic calorimeter. The phase 1 upgrade of the CMS forward calorimeter requires the replacement of the current photomultiplier tubes, as well as the installation of a new front-end readout system. The new photomultiplier tubes contain a thinner window as well as multi-anode readout. The front-end electronics will use the QIE10 ASIC which combines signal digitization with timing information. The major components of the upgrade as well as the current status are described in this paper.

  2. Tracking detectors for the sLHC, the LHC upgrade

    CERN Document Server

    Sadrozinski, Hartmut F W

    2005-01-01

    The plans for an upgrade of the Large Hadron Collider (LHC) to the Super-LHC (sLHC) are reviewed with special consideration of the environment for the inner tracking system. A straw-man detector upgrade for ATLAS is presented, which is motivated by the varying radiation levels as a function of radius, and choices for detector geometries and technologies are proposed, based on the environmental constraints. A few promising technologies for detectors are discussed, both for sensors and for the associated front-end electronics. On-going research in silicon detectors and in ASIC technologies will be crucial for the success of the upgrade.

  3. Lawrence Berkeley Laboratory upgrading approaches to existing facilities

    International Nuclear Information System (INIS)

    Engle, H.M. Jr.

    1985-01-01

    The Lawrence Berkeley Laboratory Plant Engineering Department instituted a seismic risk investigation and seismic upgrade program in 1970. This paper covers the upgrade of two buildings with dissimilar framing systems; Building No. 10, a World War II vintage heavy timber frame building, and Building No. 80, a steel frame structure constructed in 1954. The seismic upgrade task for both structures required that the buildings be kept in service during rehabilitation with a minimum of disruption to occupants. Rehabilitations were phased over two and three year periods with construction management and supervision performed by LBL Plant Engineering staff

  4. LHCb: A new Readout Control system for the LHCb Upgrade

    CERN Multimedia

    Alessio, F

    2012-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire readout architecture will be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the architecture, functionalities and the first hardware implementation of a new Readout Control system for the LHCb upgrade. The system is based on FPGAs and bi-directional links for the control of the entire readout architecture. First results on the validation of the system are also given.

  5. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    Science.gov (United States)

    Gordon, John Howard

    2014-09-09

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

  6. CHESS upgrade 1995: Improved radiation shielding

    International Nuclear Information System (INIS)

    Finkelstein, K.

    1996-01-01

    The Cornell Electron Storage Ring (CESR) stores electrons and positrons at 5.3 GeV for the production and study of B mesons, and, in addition, it supplies synchrotron radiation for CHESS. The machine has been upgraded for 300 mA operation. It is planned that each beam will be injected in about 5 minutes and that particle beam lifetimes will be several hours. In a cooperative effort, staff members at CHESS and LNS have studied sources in CESR that produce radiation in the user areas. The group has been responsible for the development and realization of new tunnel shielding walls that provide a level of radiation protection from 20 to approx-gt 100 times what was previously available. Our experience has indicated that a major contribution to the environmental radiation is not from photons, but results from neutrons that are generated by particle beam loss in the ring. Neutrons are stopped by inelastic scattering and absorption in thick materials such as heavy concrete. The design for the upgraded walls, the development of a mix for our heavy concrete, and all the concrete casting was done by CHESS and LNS personnel. The concrete incorporates a new material for this application, one that has yielded a significant cost saving in the production of over 200 tons of new wall sections. The material is an artificially enriched iron oxide pellet manufactured in vast quantities from hematite ore for the steel-making industry. Its material and chemical properties (iron and impurity content, strength, size and uniformity) make it an excellent substitute for high grade Brazilian ore, which is commonly used as heavy aggregate in radiation shielding. Its cost is about a third that of the natural ore. The concrete has excellent workability, a 28 day compressive strength exceeding 6000 psi and a density of 220 lbs/cu.ft (3.5 gr/cc). The density is limited by an interesting property of the pellets that is motivated by efficiency in the steel-making application. (Abstract Truncated)

  7. Upgrade Opportunities for Buildings in City Centres

    Directory of Open Access Journals (Sweden)

    Silva M.

    2012-10-01

    Full Text Available This proposal focus on the potential of the existing buildings upgrade process in achieving the 20-20-20 goals, as these are the biggest energy consumers, the most significant built area and the better placed buildings within our cities. These buildings frequently lack basic maintenance and need intervention, but include within themselves a vast amount of incorporated energy and centuries of construction knowledge. Beyond the advantages that may result from re-attracting people back into the city centre, upgrading these existing buildings can also have positive bounce-back effect on the reduction of the energy needs related to transportation, as demonstrated in studies that alert to the impact of the building sprawl in the total energy use. As “buildings account for 40 % of total energy consumption in the Union”, the better performance of this sector has a significant role, remembering that “these requirements shall take account of general indoor climate conditions, in order to avoid possible negative effects such as inadequate ventilation, as well as local conditions and the designated function and the age of the building” [1]. The importance of “upgrading” the existing buildings resides on the fact that new buildings represent only approximately 1 or 2% of the total usable area, an estimate that is bound to decrease due to the current construction crisis. While the recent buildings tend to be more efficient, the numerous existing buildings are important stakeholders due to their massive consumptions and incorporated energy. The ongoing Annex 56 on “Energy & Greenhouse Gas Optimized Building Renovation” assumes that “Current standards do not respond effectively to the numerous constraints imposed by existing buildings and in many cases, the requirements result in very expensive measures and complex procedures, seldom accepted by occupants, owners or developers. It is then urgent for the new standards to respond to these

  8. Upgrade of Daya Bay full scope simulator

    International Nuclear Information System (INIS)

    2006-01-01

    Daya Bay full scope simulator was manufactured by French THOMSON Company in earlier 1990s. It was put into operation in August 1992, one year before the plant's unit-1 was commissioned. During nearly 10 years, the Daya Bay simulator was used to train the control room operators. As many as 220 operators obtained their operator licenses or senior operators licenses. The Daya Bay simulator made a great contribution to the plant's operation. 2) Owing to the limitation of simulation technology and computer capacity in that age, Daya Bay simulator had its deficiencies from the beginning, making maintenance difficult, gradually bringing more and more impact on operator training. - Bad performance: The main computer was the Gould CONCEPT 32/67. Its calculation speed is quite low and memory very limited. Even in the normal operation mode, the average CPU load was up to 80%. The simulation fidelity and scope were not sufficient, which could not meet the deep level of training demand. Many special plant scenarios were not simulated; therefore it was not possible to undertake the verification exercises for the corresponding plant operations. - Poor maintainability: - In hardware aspect, due to that Gould CONCEPT 32/67 is with multi-board architecture. Thousands of tiny connection pins between boards and chasses was the weak link, after many times board plug in-out repair the connection became worse and worse. In addition, the spare parts are difficult to order. Computer crashes happened very often. Each time, the failures each took a few hours, even a few days to fix. - In software aspect, simulation modules suspension, OUT OF TIME error and software breakdown were often occurring. To restart the system took over half an hour each time, which seriously interrupted normal training. - In software maintenance aspect, most modules are manually coded and the development tools are difficult to use. Less than 10% of modifications related to the plant upgrade could be implemented on

  9. ATLAS Muon DCS Upgrades and Optimizations

    CERN Document Server

    Bakalis, Christos; The ATLAS collaboration

    2017-01-01

    The Muon subsystem is comprised of four detector types: Resistive Plate Chambers (RPC) and Thin Gap Chambers (TGC) for trigger purposes, and Cathode Strip Chambers (CSC) and Muon Drift Tubes (MDT) for muon track reconstruction. The MDTs cover a large area at the outer part of the detector. In total, there are over a 1’000 MDT chambers, which are made of about 350’000 tubes. The luminosity upgrade of the HL-LHC is expected to pose a serious challenge to the MDTs. The expected increase of particle flux will set new, higher standards regarding the operation and control of the chambers. A step towards optimizing the ATLAS Muon Detector Control System (DCS) was to develop several DCS tools, namely a High Luminosity vs Trip Limit panel with its accompanying scripts and managers. The ultimate goal of this tool is to protect the MDT chambers from the rising particle flux and its associated increase in chamber current. In addition to optimizing the ATLAS Muon DCS, several tasks to accommodate the newly installed B...

  10. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  11. Pellet injection into ASDEX upgrade plasmas

    International Nuclear Information System (INIS)

    Lang, P.T.; Zohm, H.; Buechl, K.; Fuchs, J.C.; Gehre, O.; Gruber, O.; Lang, R.S.; Mertens, V.; Neuhauser, J.; Salzmann, H.

    1996-04-01

    This work comprises results obtained using the new centrifuge injection system for the two first years of pellet injection experiments at Asdex Upgrade until the end of the 1995 experimental campaign. The main aim of the pellet injection investigation is to develop scenarios allowing for a more flexible plasma density control means of injection of cryogenic solid hydrogen pellets. Efforts have been made to develop scenarios allowing more flexible plasma density control by injecting cryogenic solid hydrogen pellets. While the injection of pellets during ohmic discharges was found to be most efficient and also improves the plasma performance, increasing the auxiliary heating power causes a detoriation of the pellet fuelling efficiency. A further strong reduction of the pellet fuelling efficiency by an additional process was observed for the more reactor-relevant conditions of shallow particle deposition during H-mode phases. With injection during type I ELMy H-mode phases, each pellet was found to trigger the release of an ELM and therefore cause particle losses mainly from the edge region. In the type I ELMy H-mode, only sufficient pellet penetration allowed noticeable, persistent particle deposition in the plasma by the pellets. Applying adequate pellet injection conditions and favourable scenarios using combined pellet/gas puff refuelling, significant density ramp-up to densities exceeding the empirical Greenwald limit by up to a factor of two was achieved even for strongly heated H-mode plasmas. (orig.)

  12. The LHCb VELO Status and Upgrade Developments

    CERN Document Server

    Bates, A G

    2006-01-01

    The LHCb VErtex LOcator (VELO) is a silicon based vertexing sub-detector which has active silicon positioned only 8~mm from the LHC beams and will operate in an extreme (up to 1.3~x~10$^{14}$~1~MeV neutron equivalents~/~cm$^2$~/~year) and non-uniform radiation environment. The complex design of the VELO silicon sensors exploits oxygenated silicon and n$^+$-on-n technology. Research has been carried out into new materials which could significantly extend the lifetime of silicon detectors at the LHC, these would have particular application in a VELO upgrade. Promising new results on the first test beam of a large, high resistivity Czochralski silicon detector with 50 $\\mu$m pitch and 40~MHz electronics will be presented. The performance was studied before and after irradiation with high energy protons. A signal to noise of over 20~:~1 was obtained from the detector and after a fluence of 4.3~x~10$^{14}$~1~MeV~n$_{eq}$ significant charge collection efficiencies were measured at relatively modest voltages. Studie...

  13. LHCb : Tracking system of the LHCb upgrade

    CERN Multimedia

    Szumlak, Tomasz

    2015-01-01

    The upgrade of the LHCb experiment will run at an instantaneous luminosity of 2x10^33 cm^-2 s^-1 with a fully software based trigger, allowing to read out the detector at a rate of 40MHz. For this purpose, the full tracking system will be newly developed: the vertex locator (VELO) will be replaced by a pixel-based detector, withstanding the high radiation dose and providing an excellent track reconstruction with an efficiency of above 99% for all charged particles of interest. Upstream of the magnet, a silicon mico-strip detector with a high granularity and an improved acceptance coverage, called the Upstream Tracker (UT), will replace the current silicon strip tracker, and provide a rough momentum estimate. The tracking system downstream of the magnet will be replaced by the Scintillating Fibre tracker (SciFi), which will consist of 12 layers using 2.5m long scintillating fibres read out by silicon photo-multipliers, providing a spatial resolution better than 100 micron and resulting in a total momentum reso...

  14. ACPR upgrade fuel motion detection system

    International Nuclear Information System (INIS)

    Kelly, J.G.; Stalker, K.T.

    1976-01-01

    Coded aperture imaging techniques are being applied to the problem of fuel motion detection in core disruptive safety experiments in the LMFBR. The upgraded Sandia Annular Core Pulse Reactor will be used for fuel motion studies, and a system is now being developed to image fuel motion through a slot in the core in l- and 7-pin experiments. The γ-rays emitted by the fuel will be modulated by a coded aperture and will form a pseudohologram on a scintillator. This shadowgram will be lens coupled first to an optical image intensifier, and then to a rotating prism framing camera. The goal is to obtain quality images of fuel with approximately 1 mm spatial resolution at about 10 4 frames/sec. Some of the feasibility milestones which have been reached thus far are the following: (1) A fuel pin shaped 252 Cf fission gamma ray source has been imaged through 1.27 cm of steel (simulating reactor containment). (2) A 252 Cf source has been imaged through 1.27 cm of steel with x-ray image intensifier amplification. (3) Collimation and shielding tests indicate that at ACPR it should be possible to obtain adequate signal to noise at the detector when the fuel is observed through a slot in the core

  15. ATLAS Transition Region Upgrade at Phase-1

    CERN Document Server

    Song, H; The ATLAS collaboration

    2014-01-01

    This report presents the L1 Muon trigger transition region (1.0<|ƞ|<1.3) upgrade of ATLAS Detector at phase-1. The high fake trigger rate in the Endcap region 1.0<|ƞ|<2.4 would become a serious problem for the ATLAS L1 Muon trigger system at high luminosity. For the region 1.3<|ƞ|<2.4, covered by the Small Wheel, ATLAS is enhancing the present muon trigger by adding local fake rejection and track angle measurement capabilities. To reduce the rate in the remaining ƞ interval it has been proposed a similar enhancement by adding at the edge of the inner barrel a structure of 3-layers RPCs of a new generation. These RPCs will be based on a thinner gas gap and electrodes with respect to the ATLAS standards, a new high performance Front End, integrating fast TDC capabilities, and a new low profile and light mechanical structure allowing the installation in the tiny space available.This design effectively suppresses fake triggers by making the coincidence with both end-cap and interaction point...

  16. Upgrade Of The ESRF Fluorescent Screen Monitors

    CERN Document Server

    Scheidt, K

    2003-01-01

    The ESRF injector system contains 23 Fluorescent Screen monitors: 4 in the TL-1 transferline (200 MeV), 8 in the Booster, and 11 in the TL-2 transferline (6 GeV). They are based on Chromium doped Alumina screens that are pneumatically inserted at 45o angle in the beam path with an optical system, at 90o angle, collecting and focusing the emitted light onto a low-cost CCD camera with standard 75Ω video output. Serving mainly alignment purposes in the past 10 years, the present upgrade aims at a 200 μm fwhm resolution for beam-size and profile measurements. The particularity of the Alumina screen not in vacuum but in atmosphere will be explained. Details of the mechanics, the optic system and a cost-efficient way of light flux adjustment will be given. The analysis of the factors determining the ultimate spatial resolution will show that it is dominated by the screen characteristics. Results obtained with different screen material will be presented.

  17. Divertor radiation in the ASDEX upgrade tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Sehmer, Till; Bernert, Matthias; Koll, Juergen; Meister, Hans; Wischmeier, Marco; Fantz, Ursel [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstrasse 2, 85748 Garching (Germany); Reimold, Felix [Forschungszentrum Juelich GmbH, Institut fuer Energie- und Klimaforschung - Plasmaphysik, 52425 Juelich (Germany); Collaboration: The ASDEX Upgrade Team

    2016-07-01

    To reduce in ITER the expected power flux density onto the divertor target, the plasma-wall interaction in the divertor needs to be strongly reduced. The fundamental path to achieve this is using radiation from seeded impurities, whereas the localization of this radiation (e.g. inside/outside confined region), which could have an impact onto the power balance, is a key challenge. The absolute radiated power distribution can be measured by foil bolometers. To study at the ASDEX Upgrade tungsten divertor the localization and quantification of radiation, the respective line of sight density of the bolometers has been improved by two additional cameras. The divertor radiation enhanced by nitrogen (N{sub 2}) seeding has been investigated, using variations of (1) the external heating power or (2) the N{sub 2} seeding rate. While in both cases the inner divertor stays fully detached, measurements indicate that the region of dominant radiation moves from the inner divertor through the X-Point into the confined region. In the outer divertor however, the measurements indicate either an immediate upwards shift or a continuous movement of the radiation away from the target, depending on experimental conditions.

  18. Three novel software tools for ASDEX Upgrade

    International Nuclear Information System (INIS)

    Martinov, S.; Löbhard, T.; Lunt, T.; Behler, K.; Drube, R.; Eixenberger, H.; Herrmann, A.; Lohs, A.; Lüddecke, K.; Merkel, R.; Neu, G.; ASDEX Upgrade Team; MPCDF Garching

    2016-01-01

    Highlights: • Key features of innovative software tools for data visualization and inspection are presented to the nuclear fusion research community. • 3D animation of experiment geometry together with diagnostic data and images allow better understanding of measurements and influence of machine construction details behind them. • Multi-video viewer with fusion relevant image manipulation abilities and event database features allows faster and better decision making from video streams coming from various plasma and machine diagnostics. • Platform independant Web technologies enable the inspection of diagnostic raw signals with virtually any kind of display device. - Abstract: Visualization of measurements together with experimental settings is a general subject in experiments analysis. The complex engineering design, 3D geometry, and manifold of diagnostics in larger fusion research experiments justify the development of special analysis and visualization programs. Novel ASDEX Upgrade (AUG) software tools bring together virtual navigation through 3D device models and advanced play-back and interpretation of video streams from plasma discharges. A third little tool allows the web-based platform independent observation of real-time diagnostic signals. While all three tools stem from spontaneous development ideas and are not considered mission critical for the operation of a fusion device, they with time and growing completeness shaped up as valuable helpers to visualize acquired data in fusion research. A short overview on the goals, the features, and the design as well as the operation of these tools is given in this paper.

  19. Upgrading model for the Volleyball teachers

    Directory of Open Access Journals (Sweden)

    Tania Rosa García Hernández

    2017-07-01

    Full Text Available The nowadays society in this XXI century influenced by the progressive development of technologies of information and communication and the knowledge management demands a creative man, transformer of the context in which he takes place, an individual who accepts the challenges of the modern society and that at the same time takes the best of this development. Meeting this goal, the higher education holds the mission of preparing in a continuous and permanent way to the professionals according to the activity they carry out, updating the knowledge in the science they work on. The sport professionals are not the exception in this endeavor due to the formative role they play in the society, it is also caused by the dynamics and the current competitions, the steady changes of the sport rules and the gradual improvement of the athlete’s performance, the venues equipment and the competition itself worldwide. This work is aimed at proposing an upgrading course for the Volleyball professionals in the sport formation school (EIDE Ormani Arenado Llonchimplemented through a strategy based on the difficulties taken from the application of the scientific methods which facilitate a viable, flexible and feasible outcome and with a high social meaning, as it contributes to rise the professional profile of the individuals involved in the study.

  20. Upgrade of CERN OP Webtools IRRAD Page

    CERN Document Server

    Vik, Magnus Bjerke

    2017-01-01

    CERN Beams Department maintains a website with various tools for the Operations Group, with one of them being specific for the Proton Irradiation Facility (IRRAD). The IRRAD team use the tool to follow up and optimize the operation of the facility. The original version of the tool was difficult to maintain and adding new features to the page was challenging. Thus this summer student project is aimed to upgrade the web page by rewriting the web page with maintainability and flexibility in mind. The new application uses a server--client architecture with a REST API on the back end which is used by the front end to request data for visualization. PHP is used on the back end to implement the API's and Swagger is used to document them. Vue, Semantic UI, Webpack, Node and ECMAScript 5 is used on the fronted to visualize and administrate the data. The result is a new IRRAD operations web application with extended functionality, improved structure and an improved user interface. It includes a new Status Panel page th...