WorldWideScience

Sample records for surveying cask contractors

  1. A robotic system to conduct radiation and contamination surveys on nuclear waste transport casks

    Energy Technology Data Exchange (ETDEWEB)

    Harrigan, R.W.; Sanders, T.L.

    1990-06-01

    The feasibility of performing, numerous spent fuel cask operations using fully integrated robotic systems is under evaluation. Using existing technology, operational and descriptive software and hardware in the form of robotic end effectors are being designed in conjunction with interfacing cask components. A robotic radiation and contamination survey system has been developed and used on mock-up cask hardware to evaluate the impact of such fully automated operations on cask design features and productivity. Based on experience gained from the survey system, numerous health physics operations can be reliably performed with little human intervention using a fully automated system. Such operations can also significantly reduce time requirements for cask-receiving operations. 7 refs., 51 figs., 6 tabs.

  2. 42 CFR 431.115 - Disclosure of survey information and provider or contractor evaluation.

    Science.gov (United States)

    2010-10-01

    ... information and provider or contractor evaluation. (a) Basis and purpose. This section implements— (1) Section... 42 Public Health 4 2010-10-01 2010-10-01 false Disclosure of survey information and provider or contractor evaluation. 431.115 Section 431.115 Public Health CENTERS FOR MEDICARE & MEDICAID...

  3. 48 CFR 53.301-1408 - Preaward Survey of Prospective Contractor-Accounting System.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Preaward Survey of Prospective Contractor-Accounting System. 53.301-1408 Section 53.301-1408 Federal Acquisition Regulations...-1408 Preaward Survey of Prospective Contractor—Accounting System. EC01MY91.093 EC01MY91.094...

  4. Cask fleet operations study

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  5. A cask fleet operations study

    Energy Technology Data Exchange (ETDEWEB)

    1988-03-01

    This document describes the cask fleet currently available to transport spent nuclear fuels. The report describes the proposed operational procedures for these casks and the vehicles intended to transport them. Included are techniques for loading the cask, lifting it onto the transport vehicle, preparing the invoices, and unloading the cask at the destination. The document concludes with a discussion on the maintenance and repair of the casks. (tem) 29 figs.

  6. What drives Greek consumer preferences for cask wine?

    DEFF Research Database (Denmark)

    Chrysochou, Polymeros; Corsi, A. M.; Krystallis Krontalis, Athanasios

    2012-01-01

    to structure, the Greek cask wine market was found to consist of four distinct segments that were labelled as connoisseurs, convenience seekers, experienced and risk averse. These segments showed differences in relation to their past experience and in the importance given to intrinsic (quality, taste, origin......Purpose – Cask wine (bag-in-box, soft pack) has not received considerable attention in wine marketing research, but interest among winemakers and consumers has been increasing steadily. However, little is known about what drives consumer preferences for cask wine and, furthermore, what the profile...... of the cask wine consumer is. This study aims at filling this gap. Design/methodology/approach – Based on a web-based survey, the best-worst scaling (BWS) method was applied to measure the importance of attributes that Greek consumers assign when choosing cask wine. Then, a latent class clustering analysis...

  7. Airborne geophysical surveys conducted in western Nebraska, 2010: contractor reports and data

    Science.gov (United States)

    ,

    2014-01-01

    This report contains three contractor reports and data files for an airborne electromagnetic survey flown from June 28 to July 7, 2010. The first report; “SkyTEM Survey: Nebraska, USA, Data” describes data aquisition and processing from a time-domain electromagnetic and magnetic survey performed by SkyTEM Canada, Inc. (the North American SkyTEM subsidiary), in western Nebraska, USA. Digital data for this report are given in Appendix 1. The airborne geophysical data from the SkyTEM survey subsequently were processed and inverted by Aarhus Geophysics ApS, Aarhus, Denmark, to produce resistivity depth sections along each flight line. The result of that processing is described in two reports presented in Appendix 2, “Processing and inversion of SkyTEM data from USGS Area UTM–13” and “Processing and inversion of SkyTEM data from USGS Area UTM–14.” Funding for these surveys was provided by the North Platte Natural Resources District, the South Platte Natural Resources District, and the Twin Platte Natural Resources District, in Scottsbluff, Sidney, and North Platte, Nebraska, respectively. Any additional information concerning the geophysical data may be obtained from the U.S. Geological Survey Crustal Geophysics and Geochemistry Science Center, Denver Colorado.

  8. TRANSPORTATION CASK RECEIPT AND RETURN FACILITY WORKER DOSE ASSESSMENT

    Energy Technology Data Exchange (ETDEWEB)

    V. Arakali

    2005-02-24

    The purpose of this design calculation is to estimate radiation doses received by personnel working in the Transportation Cask Receipt and Return Facility (TCRRF) of the repository including the personnel at the security gate and cask staging areas. This calculation is required to support the preclosure safety analysis (PCSA) to ensure that the predicted doses are within the regulatory limits prescribed by the U.S. Nuclear Regulatory Commission (NRC). The Cask Receipt and Return Facility receives NRC licensed transportation casks loaded with spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The TCRRF operation starts with the receipt, inspection, and survey of the casks at the security gate and the staging areas, and proceeds to the process facilities. The transportation casks arrive at the site via rail cars or trucks under the guidance of the national transportation system. This calculation was developed by the Environmental and Nuclear Engineering organization and is intended solely for the use of Design and Engineering in work regarding facility design. Environmental and Nuclear Engineering personnel should be consulted before using this calculation for purposes other than those stated herein or for use by individuals other than authorized personnel in the Environmental and Nuclear Engineering organization.

  9. Safety Assessment of a Metal Cask under Aircraft Engine Crash

    Directory of Open Access Journals (Sweden)

    Sanghoon Lee

    2016-04-01

    Full Text Available The structural integrity of a dual-purpose metal cask currently under development by the Korea Radioactive Waste Agency (KORAD was evaluated, through numerical simulations and a model test, under high-speed missile impact reflecting targeted aircraft crash conditions. The impact conditions were carefully chosen through a survey on accident cases and recommendations from literature. In the impact scenario, a missile flying horizontally hits the top side of the cask, which is freestanding on a concrete pad, with a velocity of 150 m/s. A simplified missile simulating a commercial aircraft engine was designed from an impact load–time function available in literature. In the analyses, the dynamic behavior of the metal cask and the integrity of the containment boundary were assessed. The simulation results were compared with the test results for a 1:3 scale model. Although the dynamic behavior of the cask in the model test did not match exactly with the prediction from the numerical simulation, other structural responses, such as the acceleration and strain history during the impact, showed very good agreement. Moreover, the containment function of the cask survived the missile impact as expected from the numerical simulation. Thus, the procedure and methodology adopted in the structural numerical analyses were successfully validated.

  10. Safety assessment of a metal cask under aircraft engine crash

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang Hoon [Dept. of Mechanical and Automotive Engineering, Keimyung University, Daegu (Korea, Republic of); Choi, Woo Seok; Seo, Ki Seog [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-04-15

    The structural integrity of a dual-purpose metal cask currently under development by the Korea Radioactive Waste Agency (KORAD) was evaluated, through numerical simulations and a model test, under high-speed missile impact reflecting targeted aircraft crash conditions. The impact conditions were carefully chosen through a survey on accident cases and recommendations from literature. In the impact scenario, a missile flying horizontally hits the top side of the cask, which is free standing on a concrete pad, with a velocity of 150 m/s. A simplified missile simulating a commercial aircraft engine was designed from an impact load-time function available in literature. In the analyses, the dynamic behavior of the metal cask and the integrity of the containment boundary were assessed. The simulation results were compared with the test results for a 1:3 scale model. Although the dynamic behavior of the cask in the model test did not match exactly with the prediction from the numerical simulation, other structural responses, such as the acceleration and strain history during the impact, showed very good agreement. Moreover, the containment function of the cask survived the missile impact as expected from the numerical simulation. Thus, the procedure and methodology adopted in the structural numerical analyses were successfully validated.

  11. Sodium-cooled LMFBR cask recommendations

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    In April of 1970 a design study to establish the parameters of a shipping cask for LMFBR Spent Fuel Assemblies from FFTF and the first demonstration plant was initiated. The basic criteria presented were that the cask should be limited to 75 tons, and that the cask should be compatible with the FFTF Fuel Assembly design and the first demonstration LMFBR Fuel Assembly design. Several features of the I-(182)-1 cask and their basis are described.

  12. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  13. COMPILATION OF DISPOSABLE SOLID WASTE CASK EVALUATIONS

    Energy Technology Data Exchange (ETDEWEB)

    THIELGES, J.R.; CHASTAIN, S.A.

    2007-06-21

    The Disposable Solid Waste Cask (DSWC) is a shielded cask capable of transporting, storing, and disposing of six non-fuel core components or approximately 27 cubic feet of radioactive solid waste. Five existing DSWCs are candidates for use in storing and disposing of non-fuel core components and radioactive solid waste from the Interim Examination and Maintenance Cell, ultimately shipping them to the 200 West Area disposal site for burial. A series of inspections, studies, analyses, and modifications were performed to ensure that these casks can be used to safely ship solid waste. These inspections, studies, analyses, and modifications are summarized and attached in this report. Visual inspection of the casks interiors provided information with respect to condition of the casks inner liners. Because water was allowed to enter the casks for varying lengths of time, condition of the cask liner pipe to bottom plate weld was of concern. Based on the visual inspection and a corrosion study, it was concluded that four of the five casks can be used from a corrosion standpoint. Only DSWC S/N-004 would need additional inspection and analysis to determine its usefulness. The five remaining DSWCs underwent some modification to prepare them for use. The existing cask lifting inserts were found to be corroded and deemed unusable. New lifting anchor bolts were installed to replace the existing anchors. Alternate lift lugs were fabricated for use with the new lifting anchor bolts. The cask tiedown frame was modified to facilitate adjustment of the cask tiedowns. As a result of the above mentioned inspections, studies, analysis, and modifications, four of the five existing casks can be used to store and transport waste from the Interim Examination and Maintenance Cell to the disposal site for burial. The fifth cask, DSWC S/N-004, would require further inspections before it could be used.

  14. Genetics Home Reference: CASK-related intellectual disability

    Science.gov (United States)

    ... Conditions CASK-related intellectual disability CASK-related intellectual disability Printable PDF Open All Close All Enable Javascript ... the expand/collapse boxes. Description CASK -related intellectual disability is a disorder of brain development that has ...

  15. A methodology for estimating the residual contamination contribution to the source term in a spent-fuel transport cask

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, T.L. (Sandia National Labs., Albuquerque, NM (United States)); Jordan, H. (EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant); Pasupathi, V. (Battelle, Columbus, OH (United States)); Mings, W.J. (USDOE Idaho Field Office, Idaho Falls, ID (United States)); Reardon, P.C. (GRAM, Inc., Albuquerque, NM (United States))

    1991-09-01

    This report describes the ranges of the residual contamination that may build up in spent-fuel transport casks. These contamination ranges are calculated based on data taken from published reports and from previously unpublished data supplied by cask transporters. The data involve dose rate measurements, interior smear surveys, and analyses of water flushed out of cask cavities during decontamination operations. A methodology has been developed to estimate the effect of residual contamination on spent-fuel cask containment requirements. Factors in estimating the maximum permissible leak rates include the form of the residual contamination; possible release modes; internal gas-borne depletion; and the temperature, pressure, and vibration characteristics of the cask during transport under normal and accident conditions. 12 refs., 9 figs., 4 tabs.

  16. Test Plan for Cask Identification Detector

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-29

    This document serves to outline the testing of a Used Fuel Cask Identification Detector (CID) currently being designed under the DOE-NE MPACT Campaign. A bench-scale prototype detector will be constructed and tested using surrogate neutron sources. The testing will serve to inform the design of the full detector that is to be used as a way of fingerprinting used fuel storage casks based on the neutron signature produced by the used fuel inside the cask.

  17. Radioactive fuel cask railcar humping study

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, L.T. (comp.)

    1978-01-01

    The response of two radioactive shipping casks due to railroad humping shocks was calculated using a spring-mass model. The two railcars for these casks had different coupling mechanisms and different tiedown arrangements. Humping tests had been performed on one of the railcars (ATMX-600) and the resulting shock spectra was used to adjust the spring-mass model to get matching results. One car (designed for cask shipment) was equipped with Freightmaster E-15 end of car coupler and had about /sup 1///sub 8/ in. free travel of the cask skid relative to the car. The other car (ATMX-600), equipped with Miner RF-333 draft gear, was designed for nuclear weapon shipment and adapted to nuclear waste shipment by fastening the casks to the floor. Both car frames were built by the same manufacturer and are very similar. The response of the casks was put in shock spectra format and a parametric study was performed with various cask weights. Additional studies were done on the effects of fastening the loose cask, and using the Freightmaster end of car coupler on the ATMX car. Half-sine response spectra were overlaid to include the natural frequency of the cask tiedown. The resulting shock amplitude was plotted against the cask weight for each car. The results show a constant acceleration level for all the weights on the car with hydraulic end-of-car coupler which results from constant force at that impact velocity. The cask acceleration can be reduced by fastening it to the car, rather than allowing it to move freely through some small space. This study also shows that the cask response can be optimized on railcars without hydraulic draft gear by adjusting the tiedown stiffness to keep the tiedown frequency different than car frequencies.

  18. IBS SURVEY 2010: DRIVERS, BARRIERS AND CRITICAL SUCCESS FACTORS IN ADOPTING INDUSTRIALISED BUILDING SYSTEM (IBS CONSTRUCTION BY G7 CONTRACTORS IN MALAYSIA

    Directory of Open Access Journals (Sweden)

    KAMARUL ANUAR MOHAMAD KAMAR

    2014-08-01

    Full Text Available The industrialised building system (IBS survey has become an essential tool for ensuring the IBS Roadmap (2003 to 2010 meets its goals and target. As part of the process review survey, it also records the trend achievement of Malaysia in the usage of IBS in the building construction industry. The first and second IBS surveys were published in 2003 and 2005, respectively. Afterward, the IBS Roadmap’s midterm review was conducted. The third and the most recent IBS surveys were conducted in 2008 and 2010, respectively. This paper aims to highlight a part of the IBS survey report in 2010, which has been conducted to measure the drivers, barriers and the critical success factors of G7 contractors in adopting IBS construction. G7 is a Construction Industry Development Board contractor grade that can apply tender without limit. The importance of this paper is that it guides the policy and implementation strategy of IBS by G7 contractors. The survey shows that the acceptance, adoption, and deployment of IBS in the Malaysian construction industry are still low and do not address the persisting problems, such as productivity, dependency on foreign workers and high level of construction wastage.

  19. Used Fuel Cask Identification through Neutron Profile

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-20

    Currently, most spent fuel is stored near reactors. An interim consolidated fuel storage facility would receive fuel from multiple sites and store it in casks on site for decades. For successful operation of such a facility there is need for a way to restore continuity of knowledge if lost as well as a method that will indicate state of fuel inside the cask. Used nuclear fuel is identifiable by its radiation emission, both gamma and neutron. Neutron emission from fission products, multiplication from remaining fissile material, and the unique distribution of both in each cask produce a unique neutron signature. If two signatures taken at different times do not match, either changes within the fuel content or misidentification of a cask occurred. It was found that identification of cask loadings works well through the profile of emitted neutrons in simulated real casks. Even casks with similar overall neutron emission or average counts around the circumference can be distinguished from each other by analyzing the profile. In conclusion, (1) identification of unaltered casks through neutron signature profile is viable; (2) collecting the profile provides insight to the condition and intactness of the fuel stored inside the cask; and (3) the signature profile is stable over time.

  20. Shielding Analysis of the 5320 Shipping Cask

    Energy Technology Data Exchange (ETDEWEB)

    Blanchard, A. [Westinghouse Savannah River Company, AIKEN, SC (United States); Nathan, S. [Westinghouse Safety Management Solutions, Aiken, SC (United States)

    1998-05-01

    The purpose of this work is to demonstrate that the 5320 shipping cask meets Federal regulations for maximum radiation dose rates when loaded with the intended plutonium oxide cargo. It should be emphasized that the 5320 is an existing cask, and therefore this work represents confirmatory analysis rather than design analysis.

  1. Bonner sphere neutron spectrometry at spent fuel casks

    CERN Document Server

    Rimpler, A

    2002-01-01

    For transport and interim storage of spent fuel elements from power reactors and vitrified highly active waste (HAW) from reprocessing, various types of casks are used. The radiation exposure of the personnel during transportation and storage of these casks is caused by mixed photon-neutron fields and, frequently, the neutron dose is predominant. In operational radiation protection, survey meters and even personal dosemeters with imperfect energy dependence of the dose-equivalent response are used, i.e. the fluence response of the devices does not match the fluence-to-dose equivalent conversion function. In order to achieve more accurate dosimetric information and to investigate the performance of dosemeters, spectrometric investigations of the neutron fields are necessary. Therefore, fluence spectra and dose rates were measured by means of a simple portable Bonner multisphere spectrometer (BSS). The paper describes briefly the experimental set-up and evaluation procedure. Measured spectra for different locat...

  2. Design review report FFTF interim storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Scott, P.L.

    1995-01-03

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location.

  3. Transfer cask system design activities: status and plan

    Energy Technology Data Exchange (ETDEWEB)

    Locke, D., E-mail: darren.locke@f4e.europa.eu [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Gutierrez, C. Gonzalez; Damiani, C.; Gracia, V. [Fusion for Energy Agency (F4E), Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Friconneau, J.-P.; Martins, J.-P.; Blight, J. [ITER Organisation, CS 90 046, 13067St. Paul Lez Durance Cedex (France)

    2011-10-15

    The ITER Cask and Plug Remote Handling System (CPRHS), a.k.a. Transfer Cask System, is a critical element of the ITER Remote Maintenance System (IRMS) devoted to transportation of components between the Tokamak building and Hot Cell. Due to the necessary confinement of contaminated components the CPRHS is defined as Safety Importance Class 1 (SIC-1) plus the mobile nature of the CPRHS brings with it a significant number of complex interfaces with other ITER sub-systems. With a total CPRHS fleet in excess of 20 units, including seven typologies, the management of design and procurement needs to be carefully planned and implemented to ensure compliance with ITER's requirements. Fusion for Energy (F4E) and its beneficiaries/contractors are currently working under ITER Task Agreements (ITAs) on the conceptual design of the CPRHS and, following the signing of the Procurement Arrangement (PA) in mid 2012, will take responsibility for the entire CPRHS fleet. F4E must, therefore, develop a robust strategy to meet the needs of both ITER machine assembly (for which a number of CPRHS units will be utilised) and the remote maintenance of ITER. Within this context this paper will present the status of the current CPRHS design activities, highlight some of the significant issues which will be faced during procurement and present the overall strategy which is being implemented by F4E in order to meet these challenging objectives.

  4. Dry Cask Storage Characterization Project - Phase 1: CASTOR V/21 Cask Opening and Examination

    Energy Technology Data Exchange (ETDEWEB)

    Bare, Walter Claude; Ebner, Matthias Anthony; Torgerson, Laurence Dale

    2001-08-01

    This report documents visual examination and testing conducted in 1999 and early 2000 at the Idaho National Engineering and Environmental Laboratory (INEEL) on a Gesellschaft für Nuklear Service (GNS) CASTOR V/21 pressurized water reactor (PWR) spent fuel dry storage cask. The purpose of the examination and testing is to develop a technical basis for renewal of licenses and Certificates of Compliance for dry storage systems for spent nuclear fuel and high-level waste at independent spent fuel storage installation sites. The examination and testing was conducted to assess the condition of the cask internal and external surfaces, cask contents consisting of 21 Westinghouse PWR spent fuel assemblies from Dominion’s (formerly named Virginia Power) Surry Power Station and cask concrete storage pad. The assemblies have been continuously stored in the CASTOR cask since 1985. Cask exterior surface and selected fuel assembly temperatures, and cask surface gamma and neutron dose rates were measured. Cask external/internal surfaces, fuel basket components including accessible weldments, fuel assembly exteriors, and primary lid seals were visually examined. Selected fuel rods were removed from one fuel assembly, visually examined, and then shipped to Argonne National Laboratory for nondestructive, destructive, and mechanical examination. Cask interior crud samples and helium cover gas samples were collected and analyzed. The results of the examination and testing indicate the concrete storage pad, CASTOR V/21 cask, and cask contents exhibited sound structural and seal integrity and that long-term storage has not caused detectable degradation of the spent fuel cladding or the release of gaseous fission products between 1985 and 1999.

  5. Status update of the BWR cask simulator

    Energy Technology Data Exchange (ETDEWEB)

    Lindgren, Eric R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Durbin, Samuel G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    The performance of commercial nuclear spent fuel dry storage casks are typically evaluated through detailed numerical analysis of the system's thermal performance. These modeling efforts are performed by the vendor to demonstrate the performance and regulatory compliance and are independently verified by the Nuclear Regulatory Commission (NRC). Carefully measured data sets generated from testing of full sized casks or smaller cask analogs are widely recognized as vital for validating these models. Numerous studies have been previously conducted. Recent advances in dry storage cask designs have moved the storage location from above ground to below ground and significantly increased the maximum thermal load allowed in a cask in part by increasing the canister helium pressure. Previous cask performance validation testing did not capture these parameters. The purpose of the investigation described in this report is to produce a data set that can be used to test the validity of the assumptions associated with the calculations presently used to determine steady-state cladding temperatures in modern dry casks. These modern cask designs utilize elevated helium pressure in the sealed canister or are intended for subsurface storage. The BWR cask simulator (BCS) has been designed in detail for both the above ground and below ground venting configurations. The pressure vessel representing the canister has been designed, fabricated, and pressure tested for a maximum allowable pressure (MAWP) rating of 24 bar at 400 C. An existing electrically heated but otherwise prototypic BWR Incoloy-clad test assembly is being deployed inside of a representative storage basket and cylindrical pressure vessel that represents the canister. The symmetric single assembly geometry with well-controlled boundary conditions simplifies interpretation of results. Various configurations of outer concentric ducting will be used to mimic conditions for above and below ground storage configurations

  6. Cask Processing Enclosure Specification/Operation - 12231

    Energy Technology Data Exchange (ETDEWEB)

    Gentry, Ronald [Transuranic Waste Processing Center, Lenoir City TN, 37771 (United States)

    2012-07-01

    Following an evaluation of throughput rates in the Hot Cell at the Transuranic Waste Processing Center and considering the variability in the waste with respect to actual dose rates a new approach to processing transuranic waste was necessary. Compounding the issue was the remote equipment poor reliability and high down-time. After considering all the factors, the evaluation resulted in the design and construction of a new waste processing area for handling the concrete casks that predominately contain contact handled transuranic (TRU) waste. The area is called the Cask Processing Enclosure and essentially the Cask Processing Enclosure mimics the projects current process techniques used for processing Contact Handled -TRU waste in the existing Box Breakdown Area and Glovebox. The Cask Processing Enclosure approach was developed based on a review of the RH processing throughput rates in the Hot Cell. As the process was reviewed consideration was given to the variability in the waste with respect to actual dose rates and the lack of equipment reliability and high wear in the Hot Cell. Based on that review, a new contact handled processing area for handling the concrete casks is being constructed and startup is expected shortly following WM2012. The Cask Processing Enclosure essentially mimics the projects current process techniques used for processing Contact Handled waste in the existing Box Breakdown Area and Glovebox and the design takes into consideration six years of operational experience. (authors)

  7. Multiple-Angle Muon Radiography of a Dry Storage Cask

    Energy Technology Data Exchange (ETDEWEB)

    Durham, J. Matthew [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Guardincerri, Elena [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Morris, Christopher [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Poulson, Daniel Cris [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bacon, Jeffrey Darnell [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Morley, Deborah Jean [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Plaud-Ramos, Kenie Omar [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-01-23

    A partially loaded dry storage cask was imaged using cosmic ray muons. Since the cask is large relative to the size of the muon tracking detectors, the instruments were placed at nine different positions around the cask to record data covering the entire fuel basket. We show that this technique can detect the removal of a single fuel assembly from the center of the cask.

  8. THERMAL EVALUATION OF ALTERNATE SHIPPING CASK FOR GTRI EXPERIMENTS

    Energy Technology Data Exchange (ETDEWEB)

    Donna Post Guillen

    2014-06-01

    The Global Threat Reduction Initiative (GTRI) has many experiments yet to be irradiated in support of the High Performance Research Reactor fuels development program. Most of the experiments will be irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), then later shipped to the Hot Fuel Examination Facility (HFEF) located at the Materials and Fuels Complex for post irradiation examination. To date, the General Electric (GE)-2000 cask has been used to transport GTRI experiments between these facilities. However, the availability of the GE-2000 cask to support future GTRI experiments is at risk. In addition, the internal cavity of the GE-2000 cask is too short to accommodate shipping the larger GTRI experiments. Therefore, an alternate shipping capability is being pursued. The Battelle Energy Alliance, LLC, Research Reactor (BRR) cask has been determined to be the best alternative to the GE-2000 cask. An evaluation of the thermal performance of the BRR cask is necessary before proceeding with fabrication of the newly designed cask hardware and the development of handling, shipping, and transport procedures. This paper presents the results of the thermal evaluation of the BRR cask loaded with a representative set of fueled and non-fueled experiments. When analyzed with identical payloads, experiment temperatures were found to be lower with the BRR cask than with the GE-2000 cask. From a thermal standpoint, the BRR cask was found to be a suitable alternate to the GE-2000 cask.

  9. Safety evaluation for packaging (onsite) SERF cask

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, W.S.

    1997-10-24

    This safety evaluation for packaging (SEP) documents the ability of the Special Environmental Radiometallurgy Facility (SERF) Cask to meet the requirements of WHC-CM-2-14, Hazardous Material Packaging and Shipping, for transfer of Type B quantities (up to highway route controlled quantities) of radioactive material within the 300 Area of the Hanford Site. This document shall be used to ensure that loading, tie down, transport, and unloading of the SERF Cask are performed in accordance with WHC-CM-2-14. This SEP is valid until October 1, 1999. After this date, an update or upgrade to this document is required.

  10. The Feasibility of Cask "Fingerprinting" as a Spent-Fuel, Dry-Storage Cask Safeguards Technique

    Energy Technology Data Exchange (ETDEWEB)

    Ziock, K P; Vanier, P; Forman, L; Caffrey, G; Wharton, J; Lebrun, A

    2005-07-27

    This report documents a week-long measurement campaign conducted on six, dry-storage, spent-nuclear-fuel storage casks at the Idaho National Laboratory. A gamma-ray imager, a thermal-neutron imager and a germanium spectrometer were used to collect data on the casks. The campaign was conducted to examine the feasibility of using the cask radiation signatures as unique identifiers for individual casks as part of a safeguards regime. The results clearly show different morphologies for the various cask types although the signatures are deemed insufficient to uniquely identify individual casks of the same type. Based on results with the germanium spectrometer and differences between thermal neutron images and neutron-dose meters, this result is thought to be due to the limitations of the extant imagers used, rather than of the basic concept. Results indicate that measurements with improved imagers could contain significantly more information. Follow-on measurements with new imagers either currently available as laboratory prototypes or under development are recommended.

  11. Impact Analyses and Tests of Metal Cask Considering Aircraft Engine Crash - 12308

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sanghoon; Choi, Woo-Seok; Kim, Ki-Young; Jeon, Je-Eon; Seo, Ki-Seog [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-07-01

    The structural integrity of a dual purpose metal cask currently under development by the Korea Radioactive Waste Management Cooperation (KRMC) is evaluated through analyses and tests under a high-speed missile impact considering the targeted aircraft crash conditions. The impact conditions were carefully chosen through a survey on accident cases and recommendations from the literature. The missile impact velocity was set at 150 m/s, and two impact orientations were considered. A simplified missile simulating a commercial aircraft engine is designed from an impact load history curve provided in the literature. In the analyses, the focus is on the evaluation of the containment boundary integrity of the metal cask. The analyses results are compared with the results of tests using a 1/3 scale model. The results show very good agreements, and the procedure and methodology adopted in the structural analyses are validated. While the integrity of the cask is maintained in one evaluation where the missile impacts the top side of the free standing cask, the containment boundary is breached in another case in which the missile impacts the center of the cask lid in a perpendicular orientation. A safety assessment using a numerical simulation of an aircraft engine crash into spent nuclear fuel storage systems is performed. A commercially available explicit finite element code is utilized for the dynamic simulation, and the strain rate effect is included in the modeling of the materials used in the target system and missile. The simulation results show very good agreement with the test results. It is noted that this is the first test considering an aircraft crash in Korea. (authors)

  12. Transportation cask decontamination and maintenance at the potential Yucca Mountain repository; Yucca Mountain Site characterization project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, D.J.; Miller, D.D. [Bechtel National, Inc., San Francisco, CA (United States); Hill, R.R. [Sandia National Labs., Albuquerque, NM (United States)

    1992-04-01

    This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.

  13. Analysis of Corrosion Residues Collected from the Aluminum Basket Rails of the High-Burnup Demonstration Cask.

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Charles R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-03-01

    On September, 2015, an inspection was performed on the TN-32B cask that will be used for the high-burnup demonstration project. During the survey, wooden cribbing that had been placed within the cask eleven years earlier to prevent shifting of the basket during transport was removed, revealing two areas of residue on the aluminum basket rails, where they had contacted the cribbing. The residue appeared to be a corrosion product, and concerns were raised that similar attack could exist at more difficult-to-inspect locations in the canister. Accordingly, when the canister was reopened, samples of the residue were collected for analysis. This report presents the results of that assessment, which determined that the corrosion was due to the presence of the cribbing. The corrosion was associated with fungal material, and fungal activity likely contributed to an aggressive chemical environment. Once the cask has been cleaned, there will be no risk of further corrosion.

  14. Inspection of Used Fuel Dry Storage Casks

    Energy Technology Data Exchange (ETDEWEB)

    Dennis C. Kunerth; Tim McJunkin; Mark McKay; Sasan Bakhtiari

    2012-09-01

    ABSTRACT The U.S. Nuclear Regulatory Commission (NRC) regulates the storage of used nuclear fuel, which is now and will be increasingly placed in dry storage systems. Since a final disposition pathway is not defined, the fuel is expected to be maintained in dry storage well beyond the time frame originally intended. Due to knowledge gaps regarding the viability of current dry storage systems for long term use, efforts are underway to acquire the technical knowledge and tools required to understand the issues and verify the integrity of the dry storage system components. This report summarizes the initial efforts performed by researchers at Idaho National Laboratory and Argonne National Laboratory to identify and evaluate approaches to in-situ inspection dry storage casks. This task is complicated by the design of the current storage systems that severely restrict access to the casks.

  15. MCO loading and cask loadout technical manual

    Energy Technology Data Exchange (ETDEWEB)

    PRAGA, A.N.

    1998-10-01

    A compilation of the technical basis for loading a multi-canister overpack (MCO) with spent nuclear fuel and then placing the MCO into a cask for shipment to the Cold Vacuum Drying Facility. The technical basis includes a description of the process, process technology that forms the basis for loading alternatives, process control considerations, safety considerations, equipment description, and a brief facility structure description.

  16. Safety analysis report for packaging: the ORNL loop transport cask

    Energy Technology Data Exchange (ETDEWEB)

    Evans, J.H.; Chipley, K.K.; Nelms, H.A.; Crowley, W.K.; Just, R.A.

    1977-11-01

    An evaluation of the ORNL loop transport cask demonstrating its compliance with the regulations governing the transportation of radioactive and fissile materials is presented. A previous review of the cask is updated to demonstrate compliance with current regulations, to present current procedures, and to reflect the more recent technology.

  17. Breeder Spent Fuel Handling Program multipurpose cask design basis document

    Energy Technology Data Exchange (ETDEWEB)

    Duckett, A.J.; Sorenson, K.B.

    1985-09-01

    The Breeder Spent Fuel Handling (BSFH) Program multipurpose cask Design Basis Document defines the performance requirements essential to the development of a legal weight truck cask to transport FFTF spent fuel from reactor to a reprocessing facility and the resultant High Level Waste (HLW) to a repository. 1 ref.

  18. Conceptual design of the Clinch River Breeder Reactor spent-fuel shipping cask

    Energy Technology Data Exchange (ETDEWEB)

    Pope, R B; Diggs, J M [eds.

    1982-04-01

    Details of a baseline conceptual design of a spent fuel shipping cask for the Clinch River Breeder Reactor (CRBR) are presented including an assessment of shielding, structural, thermal, fabrication and cask/plant interfacing problems. A basis for continued cask development and for new technological development is established. Alternates to the baseline design are briefly presented. Estimates of development schedules, cask utilization and cost schedules, and of personnel dose commitments during CRBR in-plant handling of the cask are also presented.

  19. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    servicemembers, DOD career employees , or political appointees. Contractors as Companies DOD contracts with many companies for all kinds of goods...benefits of using contractors include freeing up uniformed personnel to focus on duties only uniformed personnel can perform; providing expertise in...providing security escorts; and training police and military personnel. The number of private security contractor employees working for DOD in Iraq and

  20. Signatures of Extended Storage of Used Nuclear Fuel in Casks

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-28

    As the amount of used nuclear fuel continues to grow, more and more used nuclear fuel will be transferred to storage casks. A consolidated storage facility is currently in the planning stages for storing these casks, where at least 10,000 MTHM of fuel will be stored. This site will have potentially thousands of casks once it is operational. A facility this large presents new safeguards and nuclear material accounting concerns. A new signature based on the distribution of neutron sources and multiplication within casks was part of the Department of Energy Office of Nuclear Energy’s Material Protection, Account and Control Technologies (MPACT) campaign. Under this project we looked at fingerprinting each casks neutron signature. Each cask has a unique set of fuel, with a unique spread of initial enrichment, burnup, cooling time, and power history. The unique set of fuel creates a unique signature of neutron intensity based on the arrangement of the assemblies. The unique arrangement of neutron sources and multiplication produces a reliable and unique identification of the cask that has been shown to be relatively constant over long time periods. The work presented here could be used to restore from a loss of continuity of knowledge at the storage site. This presentation will show the steps used to simulate and form this signature from the start of the effort through its conclusion in September 2016.

  1. Signatures of Extended Storage of Used Nuclear Fuel in Casks

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-28

    As the amount of used nuclear fuel continues to grow, more and more used nuclear fuel will be transferred to storage casks. A consolidated storage facility is currently in the planning stages for storing these casks, where at least 10,000 MTHM of fuel will be stored. This site will have potentially thousands of casks once it is operational. A facility this large presents new safeguards and nuclear material accounting concerns. A new signature based on the distribution of neutron sources and multiplication within casks was part of the Department of Energy Office of Nuclear Energy’s Material Protection, Account and Control Technologies (MPACT) campaign. Under this project we looked at fingerprinting each cask's neutron signature. Each cask has a unique set of fuel, with a unique spread of initial enrichment, burnup, cooling time, and power history. The unique set of fuel creates a unique signature of neutron intensity based on the arrangement of the assemblies. The unique arrangement of neutron sources and multiplication produces a reliable and unique identification of the cask that has been shown to be relatively constant over long time periods. The work presented here could be used to restore from a loss of continuity of knowledge at the storage site. This presentation will show the steps used to simulate and form this signature from the start of the effort through its conclusion in September 2016.

  2. Viability of Existing INL Facilities for Dry Storage Cask Handling

    Energy Technology Data Exchange (ETDEWEB)

    Randy Bohachek; Charles Park; Bruce Wallace; Phil Winston; Steve Marschman

    2013-04-01

    This report evaluates existing capabilities at the INL to determine if a practical and cost effective method could be developed for opening and handling full-sized dry storage casks. The Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603, Irradiated Spent Fuel Storage Facility, provides the infrastructure to support handling and examining casks and their contents. Based on a reasonable set of assumptions, it is possible to receive, open, inspect, remove samples, close, and reseal large bolted-lid dry storage casks at the INL. The capability can also be used to open and inspect casks that were last examined at the TAN Hot Shop over ten years ago. The Castor V/21 and REA-2023 casks can provide additional confirmatory information regarding the extended performance of low-burnup (<45 GWD/MTU) used nuclear fuel. Once a dry storage cask is opened inside CPP-603, used fuel retrieved from the cask can be packaged in a shipping cask, and sent to a laboratory for testing. Testing at the INL’s Materials and Fuels Complex (MFC) can occur starting with shipment of samples from CPP-603 over an on-site road, avoiding the need to use public highways. This reduces cost and reduces the risk to the public. The full suite of characterization methods needed to establish the condition of the fuel exists and MFC. Many other testing capabilities also exist at MFC, but when those capabilities are not adequate, samples can be prepared and shipped to other laboratories for testing. This report discusses how the casks would be handled, what work needs to be done to ready the facilities/capabilities, and what the work will cost.

  3. Viability of Existing INL Facilities for Dry Storage Cask Handling

    Energy Technology Data Exchange (ETDEWEB)

    Bohachek, Randy; Wallace, Bruce; Winston, Phil; Marschman, Steve

    2013-04-30

    This report evaluates existing capabilities at the INL to determine if a practical and cost effective method could be developed for opening and handling full-sized dry storage casks. The Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603, Irradiated Spent Fuel Storage Facility, provides the infrastructure to support handling and examining casks and their contents. Based on a reasonable set of assumptions, it is possible to receive, open, inspect, remove samples, close, and reseal large bolted-lid dry storage casks at the INL. The capability can also be used to open and inspect casks that were last examined at the TAN Hot Shop over ten years ago. The Castor V/21 and REA-2023 casks can provide additional confirmatory information regarding the extended performance of low-burnup (<45 GWD/MTU) used nuclear fuel. Once a dry storage cask is opened inside CPP-603, used fuel retrieved from the cask can be packaged in a shipping cask, and sent to a laboratory for testing. Testing at the INL’s Materials and Fuels Complex (MFC) can occur starting with shipment of samples from CPP-603 over an on-site road, avoiding the need to use public highways. This reduces cost and reduces the risk to the public. The full suite of characterization methods needed to establish the condition of the fuel exists and MFC. Many other testing capabilities also exist at MFC, but when those capabilities are not adequate, samples can be prepared and shipped to other laboratories for testing. This report discusses how the casks would be handled, what work needs to be done to ready the facilities/capabilities, and what the work will cost.

  4. Nuclear cask testing films misleading and misused

    Energy Technology Data Exchange (ETDEWEB)

    Audin, L. (Audin (Lindsay), Ossining, NY (United States))

    1991-10-01

    In 1977 and 1978, Sandia National Laboratories, located in Albuquerque, New Mexico, and operated for the US Department of Energy (DOE), filmed a series of crash and fire tests performed on three casks designed to transport irradiated nuclear fuel assemblies. While the tests were performed to assess the applicability of scale and computer modeling techniques to actual accidents, films of them were quickly pressed into service by the DOE and nuclear utilities as proof'' to the public of the safety of the casks. In the public debate over the safety of irradiated nuclear fuel transportation, the films have served as the mainstay for the nuclear industry. Although the scripts of all the films were reviewed by USDOE officials before production, they contain numerous misleading concepts and images, and omit significant facts. The shorter versions eliminated qualifying statements contained in the longer version, and created false impressions. This paper discusses factors which cast doubt on the veracity of the films and the results of the tests.

  5. Nuclear cask testing films misleading and misused

    Energy Technology Data Exchange (ETDEWEB)

    Audin, L. [Audin (Lindsay), Ossining, NY (United States)

    1991-10-01

    In 1977 and 1978, Sandia National Laboratories, located in Albuquerque, New Mexico, and operated for the US Department of Energy (DOE), filmed a series of crash and fire tests performed on three casks designed to transport irradiated nuclear fuel assemblies. While the tests were performed to assess the applicability of scale and computer modeling techniques to actual accidents, films of them were quickly pressed into service by the DOE and nuclear utilities as ``proof`` to the public of the safety of the casks. In the public debate over the safety of irradiated nuclear fuel transportation, the films have served as the mainstay for the nuclear industry. Although the scripts of all the films were reviewed by USDOE officials before production, they contain numerous misleading concepts and images, and omit significant facts. The shorter versions eliminated qualifying statements contained in the longer version, and created false impressions. This paper discusses factors which cast doubt on the veracity of the films and the results of the tests.

  6. Nondestructive evaluation of LWR spent fuel shipping casks

    Energy Technology Data Exchange (ETDEWEB)

    Ballard, D.W.

    1978-02-01

    An analysis of nondestructve testing (NDT) methods currently being used to evaluate the integrity of Light Water Reactor (LWR) spent fuel shipping casks is presented. An assessment of anticipated NDT needs related to breeder reactor cask requirements is included. Specific R and D approaches to probable NDT problem areas such as the evaluation of austenitic stainless steel weldments are outlined. A comprehensive bibliography of current NDT methods for cask evaluation in the USA, Great Britain, Japan and West Germany was compiled for this study.

  7. Feasibility study for a transportation operations system cask maintenance facility

    Energy Technology Data Exchange (ETDEWEB)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  8. Test Plan for the Boiling Water Reactor Dry Cask Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, Samuel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lindgren, Eric R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    The thermal performance of commercial nuclear spent fuel dry storage casks are evaluated through detailed numerical analysis . These modeling efforts are completed by the vendor to demonstrate performance and regulatory compliance. The calculations are then independently verified by the Nuclear Regulatory Commission (NRC). Carefully measured data sets generated from testing of full sized casks or smaller cask analogs are widely recognized as vital for validating these models. Recent advances in dry storage cask designs have significantly increased the maximum thermal load allowed in a cask in part by increasing the efficiency of internal conduction pathways and by increasing the internal convection through greater canister helium pressure. These same vertical, canistered cask systems rely on ventilation between the canister and the overpack to convect heat away from the canister to the environment for both above and below-ground configurations. While several testing programs have been previously conducted, these earlier validation attempts did not capture the effects of elevated helium pressures or accurately portray the external convection of above-ground and below-ground canistered dry cask systems. The purpose of the investigation described in this report is to produce a data set that can be used to test the validity of the assumptions associated with the calculations presently used to determine steady-state cladding temperatures in modern vertical, canistered dry cask systems. The BWR cask simulator (BCS) has been designed in detail for both the above-ground and below-ground venting configurations. The pressure vessel representing the canister has been designed, fabricated, and pressure tested for a maximum allowable pressure (MAWP) rating of 24 bar at 400 deg C. An existing electrically heated but otherwise prototypic BWR Incoloy-clad test assembly is being deployed inside of a representative storage basket and cylindrical pressure vessel that represents the

  9. Experience with certifying borated stainless steel as a shipping cask basket material

    Energy Technology Data Exchange (ETDEWEB)

    Abbott, D.G. (EG and G Idaho, Inc., Idaho Falls, ID (USA)); Nickell, R.E. (Applied Science and Technology, Inc., Poway, CA (USA))

    1990-01-01

    The original cask designs for a cask demonstration project featured fuel baskets constructed of borated stainless steel (bss) as a structural material. The project is intended to demonstrate casks that can be used for both shipping and storing spent nuclear fuel assemblies. The baskets were intended to maintain the fuel assemblies in a subcritical array for both normal and accident conditions. The Nuclear Regulatory Commission, however, judged bss to be unacceptable as a structural material. The cask designs were subsequently modified. The knowledge gained during this cask demonstration project may be applicable to development of bss as a basket material in future cask design. 6 refs., 2 figs., 2 tabs.

  10. Experience with certifying borated stainless steel as a shipping cask basket material

    Energy Technology Data Exchange (ETDEWEB)

    Abbott, D.G. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Nickell, R.E. [Applied Science and Technology, Poway, CA (United States)

    1990-10-01

    This paper discusses the original cask designs for a cask demonstration project that has featured fuel baskets constructed of borated stainless steel (bss) as a structural material. The project is intended to demonstrate casks that can be used for both shipping and storing spent nuclear fuel assemblies. The baskets were intended to maintain the fuel assemblies in a subcritical array for both normal and accident conditions. The Nuclear Regulatory Commission, judged bss to be unacceptable as a structural material. The cask designs were subsequently modified. The knowledge gained during this cask demonstration project may be applicable to development of bss as a basket material in future cask design.

  11. Research on localization and alignment technology for transfer cask

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jingchuan, E-mail: jchwang@sjtu.edu.cn [Department of Automation, Shanghai Jiao Tong University, Shanghai (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China, Shanghai (China); Yang, Ming; Chen, Weidong [Department of Automation, Shanghai Jiao Tong University, Shanghai (China); Key Laboratory of System Control and Information Processing, Ministry of Education of China, Shanghai (China)

    2015-10-15

    Highlights: • A method for the alignment between TB and HCB based on localizability is proposed. • A localization method based on the localizability estimation is proposed to realize the cask's localization accurately and ensures the transfer cask's accurate docking in the front of the window of Tokmak Building. • The experimental results show that the proposed algorithm works well in the indoor simulation environment. This system will be test in EAST of China. - Abstract: According to the long length characteristics of transfer cask compared to the environment space between Tokmak Building (TB) and HCB (Hot Cell Building), this paper proposes an autonomous localization and alignment method for the internal components transportation and replacement. A localization method based on the localizability estimation is used to realize the cask's localization and navigation accurately. Once the cask arrives at the front of the TB window, the position and attitude measurement system is used to detect the relative alignment error between the seal door of pallet and the window of TB real-time. The alignment between seal door and TB window could be realized based on this offset. The simulation experiment based on the real model is designed according to the real TB situation. The experiment results show that the proposed localization and alignment method can be used for transfer cask.

  12. Geometric feasibility of flexible cask transportation system for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Lima, P.; Ribeiro, M.I.; Aparicio, P. [Instituto Superior Tecnico-Instituto de Sistemas e Robotica, Lisboa (Portugal)

    1998-07-01

    One of the remote operations that has to be carried out in the International Thermonuclear Experimental Reactor (ITER) is the transportation of sealed casks between the various ports of the Tokamak Building (TB) and the Hot Cell Building (HCB). The casks may contain different in-vessel components (e.g. blanket modules, divertors) and are designed for a maximum load of about 80 ton. To improve the safety and flexibility of ITER Remote Handling (RH) transport vehicles, the cask is not motorized by itself, but instead, a motorized platform carrying the cask was proposed. This paper addresses the geometric feasibility of the flexible cask transportation system, taking into account the vehicle kinematics. The feasibility issues studied include planning smooth paths to increase safety, the discussion of building constraints by the evaluation of the vehicle spanned areas when following a planned path, and the analysis of the clearance required to remove the platform from underneath the cask at different possible failure locations. Simulation results are presented for the recommended trajectory, the spanned area and the rescue manoeuvres at critical locations along the path. (authors)

  13. Contingency contractor optimization.

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Durfee, Justin David.; Jones, Dean A.; Martin, Nathaniel; Detry, Richard Joseph; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-10-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  14. Contingency contractor optimization.

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Detry, Richard Joseph; Durfee, Justin David.; Jones, Dean A.; Martin, Nathaniel; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-06-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  15. SHIELDING ANALYSIS OF DUAL PURPOSE CASKS FOR SPENT NUCLEAR FUEL UNDER NORMAL STORAGE CONDITIONS

    Directory of Open Access Journals (Sweden)

    JAE-HUN KO

    2014-08-01

    The design of the cask is based on the safety requirements for normal storage conditions under 10 CFR Part 72. A radiation shielding analysis of the metal storage cask optimized for loading 21 design basis fuels was performed for two cases; one for a single cask and the other for a 2×10 cask array. For the single cask, dose rates at the external surface of the metal cask, 1m and 2m away from the cask surface, were evaluated. For the 2×10 cask array, dose rates at the center point of the array and at the center of the casks’ height were evaluated. The results of the shielding analysis for the single cask show that dose rates were considerably higher at the lower side (from the bottom of the cask to the bottom of the neutron shielding of the cask, at over 2mSv/hr at the external surface of the cask. However, this is not considered to be a significant issue since additional shielding will be installed at the storage facility. The shielding analysis results for the 2×10 cask array showed exponential decrease with distance off the sources. The controlled area boundary was calculated to be approximately 280m from the array, with a dose rate of 25mrem/yr. Actual dose rates within the controlled area boundary will be lower than 25mrem/yr, due to the decay of radioactivity of spent fuel in storage.

  16. 77 FR 9591 - List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8

    Science.gov (United States)

    2012-02-17

    ... COMMISSION 10 CFR Part 72 RIN 3150-AJ05 List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8... the Holtec International HI-STORM 100 dry cask storage system listing within the ``List of Approved... other aspects of the HI-STORM 100 dry storage cask system. Because the NRC considers this...

  17. 77 FR 64834 - Computational Fluid Dynamics Best Practice Guidelines for Dry Cask Applications

    Science.gov (United States)

    2012-10-23

    ...The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comments on draft NUREG-2152, ``Computational Fluid Dynamics Best Practice Guidelines for Dry Cask Applications.'' The draft NUREG-2152 report provides best practice guidelines for undertaking simulations used to evaluate the thermal response of dry casks. Dry cask applications include transfer, transport, and......

  18. 76 FR 33121 - List of Approved Spent Fuel Storage Casks: HI-STORM Flood/Wind Addition

    Science.gov (United States)

    2011-06-08

    ... 3150-AI90 List of Approved Spent Fuel Storage Casks: HI-STORM Flood/Wind Addition AGENCY: Nuclear... the NRC's spent fuel storage regulations to add the Holtec HI-STORM Flood/Wind cask system to the... Holtec HI- STORM Flood/Wind cask system to the ``List of Approved Spent Fuel Storage Casks''...

  19. Vestibule and Cask Preparation Mechanical Handling Calculation

    Energy Technology Data Exchange (ETDEWEB)

    N. Ambre

    2004-05-26

    The scope of this document is to develop the size, operational envelopes, and major requirements of the equipment to be used in the vestibule, cask preparation area, and the crane maintenance area of the Fuel Handling Facility. This calculation is intended to support the License Application (LA) submittal of December 2004, in accordance with the directive given by DOE correspondence received on the 27th of January 2004 entitled: ''Authorization for Bechtel SAIC Company L.L.C. to Include a Bare Fuel Handling Facility and Increased Aging Capacity in the License Application, Contract Number DE-AC28-01R W12101'' (Ref. 167124). This correspondence was appended by further correspondence received on the 19th of February 2004 entitled: ''Technical Direction to Bechtel SAIC Company L.L. C. for Surface Facility Improvements, Contract Number DE-AC28-01R W12101; TDL No. 04-024'' (Ref. 16875 1). These documents give the authorization for a Fuel Handling Facility to be included in the baseline. The limitations of this preliminary calculation lie within the assumptions of section 5 , as this calculation is part of an evolutionary design process.

  20. Contract Report for Usage Inspection of KN-12 Transport Cask

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. C.; Seo, K. S.; Bang, K. S.; Cho, I. J.; Kim, D. H.; Min, D. K

    2007-03-15

    The usage inspection of the KN-12 spent nuclear fuel transport package was performed to receive the license for reuse. According to the Korea Atomic Energy Act, all type B transport package should receive and pass the usage inspection every five years. The KN-12 transport cask was designed to transport twelve spent PWR fuel assemblies under wet and dry conditions. The cask was developed and licensed in 2002 in accordance with the Korea and the IAEA's safe transport regulations. The areas of usage inspection include: visual inspection, nondestructive weld inspection, load test, maximum operating pressure test, leakage test, shielding test, thermal test, external surface contamination test. In the results of the usage inspection, the damage or defect could not found out and the performance of the cask was maintained according to the requirements of the regulation. Therefore, the usage inspection was successfully performed to acquire the license for the reuse.

  1. Standard review plan for dry cask storage systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The Standard Review Plan (SRP) For Dry Cask Storage Systems provides guidance to the Nuclear Regulatory Commission staff in the Spent Fuel Project Office for performing safety reviews of dry cask storage systems. The SRP is intended to ensure the quality and uniformity of the staff reviews, present a basis for the review scope, and clarification of the regulatory requirements. Part 72, Subpart B generally specifies the information needed in a license application for the independent storage of spent nuclear fuel and high level radioactive waste. Regulatory Guide 3.61 {open_quotes}Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask{close_quotes} contains an outline of the specific information required by the staff. The SRP is divided into 14 sections which reflect the standard application format. Regulatory requirements, staff positions, industry codes and standards, acceptance criteria, and other information are discussed.

  2. Benchmarking Data for the Proposed Signature of Used Fuel Casks

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-23

    A set of benchmarking measurements to test facets of the proposed extended storage signature was conducted on May 17, 2016. The measurements were designed to test the overall concept of how the proposed signature can be used to identify a used fuel cask based only on the distribution of neutron sources within the cask. To simulate the distribution, 4 Cf-252 sources were chosen and arranged on a 3x3 grid in 3 different patterns and raw neutron totals counts were taken at 6 locations around the grid. This is a very simplified test of the typical geometry studied previously in simulation with simulated used nuclear fuel.

  3. Safety analysis report for medical radioisotope transport cask

    Energy Technology Data Exchange (ETDEWEB)

    Seo, K. S.; Ku, J. H.; Lee, J. C. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-10-01

    KAERI has been producing radioisotopes for medical and industrial use and supplying them to radioisotope-using hospitals and industries. RI transport cask of A type package has been developed to transport medical radioisotopes from the HANARO to the hospitals. The safety analyses were performed under normal transport conditions in accordance with standards of transport regulations. As a results, it should be verified that the cask maintains the shielding and structural integrities under prescribed condition by the regulations. 8 refs., 20 figs., 7 tabs. (Author)

  4. Thermoelectric Powered Wireless Sensors for Dry-Cask Storage

    Science.gov (United States)

    Carstens, Thomas Alan

    This study focuses on the development of self-powered wireless sensors. These sensors can be used to measure key parameters in extreme environments; e.g., temperature monitoring for spent nuclear fuel during dry-cask storage. This study has developed a design methodology for these self-powered monitoring systems. The main elements that constitute this work consist of selecting and testing a power source for the wireless sensor, determination of the attenuation of the wireless signal, and testing the wireless sensor circuitry in an extreme environment. OrigenArp determined the decay heat and gamma/neutron source strength of the spent fuel throughout the service life of the dry-cask. A first principles analysis modeled the temperatures inside the dry-cask. A finite-element heat transfer code calculated the temperature distribution of the thermoelectric and heat sink. The temperature distributions determine the power produced by the thermoelectric. It was experimentally verified that a thermoelectric generator (HZ-14) with a DC/DC converter (Linear Technology LTC3108EDE) can power a transceiver (EmbedRF) at condition which represent prototypical conditions throughout and beyond the service life of the dry-cask. The wireless sensor is required to broadcast with enough power to overcome the attenuation from the dry-cask. It will be important to minimize the attenuation of the signal in order to broadcast with a small transmission power. To investigate the signal transmission through the dry-cask, CST Microwave Studio was used to determine the scattering parameter S2,1 for a horizontal dry-cask. Important parameters that can influence the transmission of the signal are antenna orientation, antenna placement, and transmission frequency. The thermoelectric generator, DC/DC converter, and transceiver were exposed to 60Co gamma radiation (exposure rate170.3 Rad/min) at the University of Wisconsin Medical Radiation Research Center. The effects of gamma radiation on the

  5. ACCIDENTAL DROP OF A CARBON STEEL/LEAD SHIPPING CASK AT LOW TEMPERATURES

    Energy Technology Data Exchange (ETDEWEB)

    B. D. Hawkes; K. R. Durstine

    2007-07-01

    A shielded cask is used to transport radioactive materials between facilities. The cask was fabricated with an outer and inner shell of hot rolled low carbon steel. Lead was poured in the annular space between the shells to provide radiation shielding. Carbon steel is known to be susceptible to lowtemperature brittle fracture under impact loading. This paper will present the analysis results representing postulated transportation accidents during on-site transfers of the cask. The accident scenarios were based on a series of cask drops onto a rigid surface from a height of 6 ft assuming brittle failure of the cask shell at subzero temperatures. Finite element models of the cask and its contents were solved and post processed using ABAQUS software. Each model was examined for failure to contain radioactive materials and/or significant loss of radiation shielding. Results of these analyses show that the body of the cask exhibits considerable ruggedness and will remain largely intact after the impact. There will be deformation of the main cask body with localized brittle failure of the cask outer shell and components and but no complete penetration of the cask shielding. The cask payload outer waste can will experience some permanent plastic deformation in each drop, but will not be deformed to the point where it will rupture, thus maintaining confinement of the can contents.

  6. Cosmic ray muon computed tomography of spent nuclear fuel in dry storage casks

    CERN Document Server

    Poulson, D; Guardincerri, E; Morris, C L; Bacon, J D; Plaud-Ramos, K; Morley, D; Hecht, A

    2016-01-01

    Radiography with cosmic ray muon scattering has proven to be a successful method of imaging nuclear material through heavy shielding. Of particular interest is monitoring dry storage casks for diversion of plutonium contained in spent reactor fuel. Using muon tracking detectors that surround a cylindrical cask, cosmic ray muon scattering can be simultaneously measured from all azimuthal angles, giving complete tomographic coverage of the cask interior. This paper describes the first application of filtered back projection algorithms, typically used in medical imaging, to cosmic ray muon imaging. The specific application to monitoring spent nuclear fuel in dry storage casks is investigated via GEANT4 simulations. With a cylindrical muon tracking detector surrounding a typical spent fuel cask, the cask contents can be confirmed with high confidence in less than two days exposure. Similar results can be obtained by moving a smaller detector to view the cask from multiple angles.

  7. Army Overdependency on Contractors

    Science.gov (United States)

    2005-02-20

    Army Overdependency on Contrators EWS 2005 Subject Area Topical Issues Contemporary Issues Paper Submitted by Captain HL Morris...aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services , Directorate for Information... service would not be interrupted if the contractor failed to perform. The guidelines also mandated that the Army had to be capable of providing

  8. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  9. A design report for DFDF radioactive waste storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Lee, H. H.; Kim, J. H.; Park, J. J.; Yang, M. S.; Lee, J. C.; Seo, K. S

    2004-01-01

    The fabrication of DUPIC fuel powder, pellet and fuel rod has been conducted since the early 2000 at DFDF hot cell, together with their fabrication characterization experiment. The equipment that were used in the experiment, if necessary, have to be disassembled to be transported to the storage facility according to the appropriate management procedures. Therefore, specially designed dedicated storage cask is needed for the waste of large volume such as contaminated equipment and disassembled parts from the equipment. The storage cask, 'A' type transportation cask, has a cylindrical shape and consists of body and lid. It also has a dual cell structure. The cells are made of stainless steel and the lead is molded into the space between cells as a gamma radiation protector. The storage cask is 1,145mm high and weighs 3.5 ton. Its inner and outer diameter are 1,080mm and 1,210mm, respectively. It is designed to maintain at 0.3kg/cm{sup 2} to prevent possible leakage during the storage.

  10. THERMAL MODELING ANALYSIS OF SRS 70 TON CASK

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.; Jordan, J.; Hensel, S.

    2011-03-08

    The primary objective of this work was to perform the thermal calculations to evaluate the Material Test Reactor (MTR) fuel assembly temperatures inside the SRS 70-Ton Cask loaded with various bundle powers. MTR fuel consists of HFBR, MURR, MIT, and NIST. The MURR fuel was used to develop a bounding case since it is the fuel with the highest heat load. The results will be provided for technical input for the SRS 70 Ton Cask Onsite Safety Assessment. The calculation results show that for the SRS 70 ton dry cask with 2750 watts total heat source with a maximum bundle heat of 670 watts and 9 bundles of MURR bounding fuel, the highest fuel assembly temperatures are below about 263 C. Maximum top surface temperature of the plastic cover is about 112 C, much lower than its melting temperature 260 C. For 12 bundles of MURR bounding fuel with 2750 watts total heat and a maximum fuel bundle of 482 watts, the highest fuel assembly temperatures are bounded by the 9 bundle case. The component temperatures of the cask were calculated by a three-dimensional computational fluid dynamics approach. The modeling calculations were performed by considering daily-averaged solar heat flux.

  11. Seismic Performance of Dry Casks Storage for Long- Term Exposure

    Energy Technology Data Exchange (ETDEWEB)

    Ibarra, Luis [Univ. of Utah, Salt Lake City, UT (United States); Sanders, David [Univ. of Nevada, Reno, NV (United States); Yang, Haori [Oregon State Univ., Corvallis, OR (United States); Pantelides, Chris [Univ. of Utah, Salt Lake City, UT (United States)

    2016-12-30

    The main goal of this study is to evaluate the long-term seismic performance of freestanding and anchored Dry Storage Casks (DSCs) using experimental tests on a shaking table, as well as comprehensive numerical evaluations that include the cask-pad-soil system. The study focuses on the dynamic performance of vertical DSCs, which can be designed as free-standing structures resting on a reinforced concrete foundation pad, or casks anchored to a foundation pad. The spent nuclear fuel (SNF) at nuclear power plants (NPPs) is initially stored in fuel-storage pools to control the fuel temperature. After several years, the fuel assemblies are transferred to DSCs at sites contiguous to the plant, known as Interim Spent Fuel Storage Installations (ISFSIs). The regulations for these storage systems (10 CFR 72) ensure adequate passive heat removal and radiation shielding during normal operations, off-normal events, and accident scenarios. The integrity of the DSCs is important, even if the overpack does not breach, because eventually the spent fuel-rods need to be shipped either to a reprocessing plant or a repository. DSCs have been considered as a temporary storage solution, and usually are licensed for 20 years, although they can be relicensed for operating periods of up to 60 years. In recent years, DSCs have been reevaluated as a potential mid-term solution, in which the operating period may be extended for up to 300 years. At the same time, recent seismic events have underlined the significant risks DSCs are exposed. The consideration of DCSs for storing spent fuel for hundreds of years has created new challenges. In the case of seismic hazard, longer-term operating periods not only lead to larger horizontal accelerations, but also increase the relative effect of vertical accelerations that usually are disregarded for smaller seismic events. These larger seismic demands could lead to casks sliding and tipping over, impacting the concrete pad or adjacent casks. The casks

  12. Accidental Drop of a Carbon Steel/Lead Shipping Cask (HFEF 14) at Low Temperatures

    Energy Technology Data Exchange (ETDEWEB)

    Brian D. Hawkes; Michael E. Nitzel

    2007-08-01

    A shielded cask is used to transport radioactive materials between facilities at the Idaho National Laboratory. The cask was fabricated with an outer and inner shell of A36 carbon steel with lead poured in the annular space between the shells to provide radiation shielding. Carbon steel is known to be susceptible to low-temperature brittle fracture under impact loading. This paper will present the analysis results representing postulated transportation accidents during on-site transfers of the cask at subzero temperatures. The accident scenarios were based on a series of cask drops onto a rigid surface from a height of 1.83m (6 ft.) Finite element models of the cask and its contents were solved and post processed using the ABAQUS software. Each model was examined for failure to contain radioactive materials and/or significant loss of radiation shielding. Results of these analyses show that the body of the cask exhibits considerable ruggedness and will remain largely intact after the impact. There will be deformation of the main cask body with localized brittle failure of the cask outer shell and door structure. The cask payload outer waste can remains in the cask but will experience some permanent plastic deformation in each drop. It will not be deformed to the point where it will rupture, thus maintaining confinement of the can contents.

  13. Design of casks: incorporating operational feedback from maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Bimet, F.; Hartenstein, M. [COGEMA Logistics, Saint Quentin (France)

    2004-07-01

    Casks are designed to conform to regulations and to client specifications. Essential areas such as easy operation, low costs of maintenance, low operation and maintenance doses, limited waste, are not explicitly covered. Notwithstanding, COGEMA LOGISTICS uses all feedback available, so that casks are designed to be easy, safe and economical to operate and maintain. Maintenance is an activity where you do spot items that old-time designers could have made better, and things that users should not have done. Thanks to quality assurance, there are a number of data available, waiting to be collected and exploited; they have to be identified, located, retrieved, and analysed. Using information such as wear, damage, use of spare parts, access problems helps to make casks ever better. It leads to more efficient concepts, and to upgrades on existing designs; it also allows to integrate environmental considerations, inter alia in the choice of materials and in maintenance methods. It is necessary for the designer to interact with the users, the cask owners, the maintenance providers, in order to gather all relevant information and events. This is made easier when all these actors are ''under one roof'', or have very close ties. This paper presents COGEMA LOGISTICS methods for collecting and analysing all these experiences waiting to be used. It explains our process for analysing data, preparing yearly reports that are made available to our designers. It describes how each new design is subject to a maintainability study, using this feedback, so that the cask safety is always assured, that radiological doses are kept to a minimum, and that operating and maintenance costs will remain as low as possible.

  14. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  15. Design analysis report for the TN-WHC cask and transportation system

    Energy Technology Data Exchange (ETDEWEB)

    Brisbin, S.A., Fluor Daniel Hanford

    1997-02-13

    This document presents the evaluation of the Spent Nuclear Fuel Cask and Transportation System. The system design was developed by Transnuclear, Inc. and its team members NAC International, Nelson Manufacturing, Precision Components Corporation, and Numatec, Inc. The cask is designated the TN-WHC cask. This report describes the design features and presents preliminary analyses performed to size critical dimensions of the system while meeting the requirements of the performance specification.

  16. Survivability Tests on a Nuclear Waste Cask in Simulated Railroad Accident Fires.

    Science.gov (United States)

    1983-06-01

    Test Number 1 42 11. The Wind Direction as a Function of Time During the HNPF Cask Thermal Test Number 1...43 12. The Wind Speed as a Function of Time During the HNPF Cask Thermal Test Number 1 .......................................... 44 13. The Ambient...60 27. A View of the HNPF Cask Taken During Torch Thermal Test Number 2 62 28. The Wind Direction as a

  17. Conceptual design of fuel transfer cask for Reactor TRIGA PUSPATI (RTP)

    Science.gov (United States)

    Muhamad, Shalina Sheik; Hamzah, Mohd Arif Arif B.

    2014-02-01

    Spent fuel transfer cask is used to transfer a spent fuel from the reactor tank to the spent fuel storage or for spent fuel inspection. Typically, the cask made from steel cylinders that are either welded or bolted closed. The cylinder is enclosed with additional steel, concrete, or other material to provide radiation shielding and containment of the spent fuel. This paper will discuss the Conceptual Design of fuel transfer cask for Reactor TRIGA Puspati (RTP).

  18. Phenotypic and molecular insights into CASK-related disorders in males

    OpenAIRE

    Moog, U.; T Bierhals; Brand, K.; Bautsch, J.; Biskup, S.; Brune, T.; J. Denecke; Die-Smulders, C E M de; Evers, C.; Hempel, M.; Henneke, M; Yntema, H.G.; Menten, B.; Pietz, J.; Pfundt, R.P.

    2015-01-01

    Background Heterozygous loss-of-function mutations in the X-linked CASK gene cause progressive microcephaly with pontine and cerebellar hypoplasia (MICPCH) and severe intellectual disability (ID) in females. Different CASK mutations have also been reported in males. The associated phenotypes range from nonsyndromic ID to Ohtahara syndrome with cerebellar hypoplasia. However, the phenotypic spectrum in males has not been systematically evaluated to date. Methods We identified a CASK alteration...

  19. STABILITY EVALUATION OF METAL CASK ATTACHED TO A TRANSFER PALLET DURING LONG-PERIOD SEISMIC MOTIONS

    Science.gov (United States)

    Kawaguchi, Shohei; Shirai, Koji; Kanazawa, Kenji

    Rocking behavior of unfixed body is affected by center of mass, material coefficient of restitution and so on. 2/5 scale metal cask model considering these parameter was used for seismic test to evaluate stability of grounding metal cask attached to a transfer pallet under the influence of long-period earthquake motion. The newest knowledge from seismic test indicates seismic motion with high velocity over 100 kine not always cause the raise of response velocity of metal cask because of energy consumption by cask sliding and impact deformation of concrete. And new estimation method (called "Window energy spectrum method") of earthquake response spectrum gives suitable evaluation of response energy.

  20. Safety analysis report for packaging: the ORNL in-pile capsule shipping cask

    Energy Technology Data Exchange (ETDEWEB)

    Evans, J.H.; Chipley, K.K.; Haynie, C.B.; Crowley, W.K.; Just, R.A.

    1977-11-01

    The ORNL in-pile capsule shipping cask is used to transport irradiated experimental capsules and spent fuel elements. The cask was analytically evaluated to determine its compliance with the applicable regulations governing containers in which radioactive materials are transported. Computational procedures were used to determine the structural integrity and thermal behavior of the cask relative to the general standards for normal conditions of transport and the standards for the hypothetical accident conditions. The results of the evaluation show that the cask is in compliance with the applicable regulations.

  1. Breeder Spent Fuel Handling (BSFH) cask study for FY83. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Diggs, J M

    1985-01-01

    This report documents a study conducted to investigate the applicability of existing LWR casks to shipment of long-cooled LMFBR fuel from the Clinch River Breeder Reactor Plant (CRBRP) to the Breeder Reprocessing Engineering Test (BRET) Facility. This study considered a base case of physical constraints of plants and casks, handling capabilities of plants, through-put requirements, shielding requirements due to transportation regulation, and heat transfer capabilities of the cask designs. Each cask design was measured relative to the base case. 15 references, 4 figures, 6 tables.

  2. Safety evaluation for packaging (onsite) disposable solid waste cask

    Energy Technology Data Exchange (ETDEWEB)

    Flanagan, B.D., Westinghouse Hanford

    1996-12-20

    This safety evaluation for packaging (SEP) evaluates and documents the ability of the Disposable Solid Waste Cask (DSWC) to meet the packaging requirements of HNF-CM-2-14, Hazardous Material Packaging and Shipping, for the onsite transfer of special form, highway route controlled quantity, Type B fissile radioactive material. This SEP evaluates five shipments of DSWCs used for the transport and storage of Fast Flux Test Facility unirradiated fuel to the Plutonium Finishing Plant Protected Area.

  3. Performance of bolted closure joint elastomers under cask aging conditions

    Energy Technology Data Exchange (ETDEWEB)

    Verst, C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Sindelar, R. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Skidmore, E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Daugherty, W. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-07-23

    The bolted closure joint of a bare spent fuel cask is susceptible to age-related degradation and potential loss of confinement function under long-term storage conditions. Elastomeric seals, a component of the joint typically used to facilitate leak testing of the primary seal that includes the metallic seal and bolting, is susceptible to degradation over time by several mechanisms, principally via thermo-oxidation, stress-relaxation, and radiolytic degradation under time and temperature condition. Irradiation and thermal exposure testing and evaluation of an ethylene-propylene diene monomer (EPDM) elastomeric seal material similar to that used in the CASTOR® V/21 cask for a matrix of temperature and radiation exposure conditions relevant to the cask extended storage conditions, and development of semiempirical predictive models for loss of sealing force is in progress. A special insert was developed to allow Compressive Stress Relaxation (CSR) measurements before and after the irradiation and/or thermal exposure without unloading the elastomer. A condition of the loss of sealing force for the onset of leakage was suggested. The experimentation and modeling being performed could enable acquisition of extensive coupled aging data as well as an estimation of the timeframe when loss of sealing function under aging (temperature/radiation) conditions may occur.

  4. Characteristics and fabrication of cermet spent nuclear fuel casks: ceramic particles embedded in steel

    Energy Technology Data Exchange (ETDEWEB)

    Forsberg, C.W.; Swaney, P.M.; Tiegs, T.N. [Oak Ridge National Lab., Oak Ridge, TN (United States)

    2004-07-01

    Cermets are being investigated as an advanced material of construction for casks that can be used for storage, transport, or disposal of spent nuclear fuel (SNF). Cermets, which consist of ceramic particles embedded in steel, are a method to incorporate brittle ceramics with highly desirable properties into a strong ductile metal matrix with a high thermal conductivity, thus combining the best properties of both materials. Traditional applications of cermets include tank armor, vault armor, drill bits, and nuclear test-reactor fuel. Cermets with different ceramics (DUO{sub 2}, Al{sub 2}O{sub 3}, Gd{sub 2}O{sub 3}, etc.) are being investigated for the manufacture of SNF casks. Cermet casks offer four potential benefits: greater capacity (more SNF assemblies) for the same gross weight cask, greater capacity (more SNF assemblies) for the same external dimensions, improved resistance to assault, and superior repository performance. These benefits are achieved by varying the composition, volume fraction, and particulate size of the ceramic particles in the cermet with position in the cask body. Addition of depleted uranium dioxide (DUO{sub 2}) to the cermet increases shielding density, improves shielding effectiveness, and increases cask capacity for a given cask weight or size. Addition of low-density aluminium oxide (Al{sub 2}O{sub 3}) to the outer top and bottom sections of the cermet cask, where the radiation levels are lower, can lower cask weight without compromising shielding. The use of Al2O3 and other oxides, in appropriate locations, can increase resistance to assault. Repository performance may be improved by compositional control of the cask body to (1) create a local geochemical environment that slows the long-term degradation of the SNF and (2) enables the use of DUO{sub 2} for longterm criticality control. While the benefits of using cermets follow directly from their known properties, the primary challenge is to develop low-cost methods to fabricate

  5. Basic Considerations for Dry Storage of Spent Nuclear Fuels and Revisited CFD Thermal Analysis on the Concrete Cask

    Energy Technology Data Exchange (ETDEWEB)

    Noh, Jae Soo [ACT Co. Ltd., Daejeon (Korea, Republic of); Park, Younwon; Song, Sub Lee [BEES Inc., Daejeon (Korea, Republic of); Kim, Hyeun Min [KAIST, Daejeon (Korea, Republic of)

    2016-10-15

    The integrity of storage facility and also of the spent nuclear fuel itself is considered very important. Storage casks can be located in a designated area on a site or in a designated storage building. A number of different designs for dry storage have been developed and used in different countries. Dry storage system was classified into two categories by IAEA. One is container including cask and silo, the other one is vault. However, there is various way of categorization for dry storage system. Dry silo and cask are usually classified separately, so the dry storage system can be classified into three different types. Furthermore, dry cask storage can be categorized into two types based on the type of the materials, concrete cask and metal cask. In this paper, the design characteristics of dry storage cask are introduced and computational fluid dynamics (CFD) based thermal analysis for concrete cask is revisited. Basic principles for dry storage cask design were described. Based on that, thermal analysis of concrete dry cask was introduced from the study of H. M. Kim et al. From the CFD calculation, the temperature of concrete wall was maintained under the safety criteria. From this fundamental analysis, further investigations are expected. For example, thermal analysis on the metal cask, thermal analysis on horizontally laid spent nuclear fuel assemblies for transportation concerns, and investigations on better performance of natural air circulation in dry cask can be promising candidates.

  6. Key aspects in managing safety when working with multiple contractors: A case study.

    Science.gov (United States)

    Drupsteen, Linda; Rasmussen, Hanna B; Ustailieva, Erika; van Kampen, Jakko

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues are explored through a brief survey and a workshop in the maintenance department of a logistics company. The results indicate that culture and behavior are recognized differently by clients and by contractors. The contractors and client had different perceptions of involvement of contractors by the client. The contractors complained on lack of involvement, which was not fully recognized by the client. The case study used a practical approach to show differences in perception of safety within a project. The study illustrates the need for more applied studies and interventions on contractor safety.

  7. Phenotypic and molecular insights into CASK-related disorders in males

    NARCIS (Netherlands)

    Moog, U.; Bierhals, T.; Brand, K.; Bautsch, J.; Biskup, S.; Brune, T.; Denecke, J.; Die-Smulders, C.E.M. de; Evers, C.; Hempel, M.; Henneke, M.; Yntema, H.G.; Menten, B.; Pietz, J.; Pfundt, R.P.; Schmidtke, J.; Steinemann, D.; Stumpel, C.T.; Maldergem, L. Van; Kutsche, K.

    2015-01-01

    BACKGROUND: Heterozygous loss-of-function mutations in the X-linked CASK gene cause progressive microcephaly with pontine and cerebellar hypoplasia (MICPCH) and severe intellectual disability (ID) in females. Different CASK mutations have also been reported in males. The associated phenotypes range

  8. 77 FR 24585 - List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8

    Science.gov (United States)

    2012-04-25

    ... 3150-AJ05 List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8 AGENCY: Nuclear... amends the NRC's spent fuel storage regulations by revising the Holtec International HI-STORM 100 System... International HI-STORM 100 System listing within the ``List of Approved Spent Fuel Storage Casks'' to...

  9. 78 FR 8050 - Spent Fuel Cask Certificate of Compliance Format and Content

    Science.gov (United States)

    2013-02-05

    ... designers, major architect/engineering firms, and other organizations and entities involved in the nuclear... NRC-certified dry storage cask designs.'' III. The Petition In its petition (ADAMS Accession No... encompass the evaluation of the site-specific parameters versus the cask design bases information''...

  10. Phenotypic and molecular insights into CASK-related disorders in males

    NARCIS (Netherlands)

    Moog, U.; Bierhals, T.; Brand, K.; Bautsch, J.; Biskup, S.; Brune, T.; Denecke, J.; Die-Smulders, C.E.M. de; Evers, C.; Hempel, M.; Henneke, M.; Yntema, H.G.; Menten, B.; Pietz, J.; Pfundt, R.P.; Schmidtke, J.; Steinemann, D.; Stumpel, C.T.; Maldergem, L. Van; Kutsche, K.

    2015-01-01

    BACKGROUND: Heterozygous loss-of-function mutations in the X-linked CASK gene cause progressive microcephaly with pontine and cerebellar hypoplasia (MICPCH) and severe intellectual disability (ID) in females. Different CASK mutations have also been reported in males. The associated phenotypes range

  11. Regulation of dopamine release by CASK-β modulates locomotor initiation in Drosophila melanogaster

    Directory of Open Access Journals (Sweden)

    Justin eSlawson

    2014-11-01

    Full Text Available CASK is an evolutionarily conserved scaffolding protein that has roles in many cell types. In Drosophila, loss of the entire CASK gene or just the CASK-β transcript causes a complex set of adult locomotor defects. In this study, we show that the motor initiation component of this phenotype is due to loss of CASK-β in dopaminergic neurons and can be specifically rescued by expression of CASK-β within this subset of neurons. Functional imaging demonstrates that mutation of CASK-β disrupts coupling of neuronal activity to vesicle fusion. Consistent with this, locomotor initiation can be rescued by artificially driving activity in dopaminergic neurons. The molecular mechanism underlying this role of CASK-β in dopaminergic neurons involves interaction with Hsc70-4, a molecular chaperone previously shown to regulate calcium-dependent vesicle fusion. These data suggest that there is a novel CASK-β-dependent regulatory complex in dopaminergic neurons that serves to link activity and neurotransmitter release.

  12. Results for the Aboveground Configuration of the Boiling Water Reactor Dry Cask Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, Samuel G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lindgren, Eric R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-09-30

    The thermal performance of commercial nuclear spent fuel dry storage casks is evaluated through detailed numerical analysis. These modeling efforts are completed by the vendor to demonstrate performance and regulatory compliance. The calculations are then independently verified by the Nuclear Regulatory Commission (NRC). Carefully measured data sets generated from testing of full-sized casks or smaller cask analogs are widely recognized as vital for validating these models. Recent advances in dry storage cask designs have significantly increased the maximum thermal load allowed in a cask, in part by increasing the efficiency of internal conduction pathways, and also by increasing the internal convection through greater canister helium pressure. These same canistered cask systems rely on ventilation between the canister and the overpack to convect heat away from the canister to the environment for both above- and below-ground configurations. While several testing programs have been previously conducted, these earlier validation attempts did not capture the effects of elevated helium pressures or accurately portray the external convection of above-ground and below-ground canistered dry cask systems. The purpose of the current investigation was to produce data sets that can be used to test the validity of the assumptions associated with the calculations used to determine steady-state cladding temperatures in modern dry casks that utilize elevated helium pressure in the sealed canister in an above-ground configuration.

  13. Research on Shielding of High-capacity Cobalt Source Transport Cask%大容量钴源运输容器屏蔽研究

    Institute of Scientific and Technical Information of China (English)

    薛娜; 王炳衡; 毛亚蔚

    2015-01-01

    大容量钴源运输容器为运输工业用钴源而设计的专用设备。由于内容物放射性活度水平很高、衰变热很大,仅有少数国家具有设计能力,在国内的研制尚属首次。在对钴源运输容器的屏蔽设计研制过程中,突破之前的屏蔽设计技术束缚,采用MCAM程序与MCNP程序模拟计算钴源运输容器外的剂量率水平,并在设计过程中及时发现容器存在的设计缺陷,从而进行了设计改进,保证了容器满足国家标准要求的各项设计措施。目前这些设计措施已通过相关的试验验证。结果表明:针对大容量60 Co运输容器的关键技术制定的设计措施合理有效,充分保证了容器在经受国家标准中规定的正常运输条件和运输中事故条件下各项试验后容器屏蔽性能的完整性,确保钴源运输的安全。%High‐capacity cobalt source transport casks are used to transport 60 Co indus‐trial irradiators .The radioactive contents have special features of high‐activity and high residual heat ,so only a few countries have design capacity .This is the first design pro‐ject for the self‐reliant design of high‐capacity cobalt source transport casks .This paper was devoted to key technology in shielding design of these casks .The MCAM code and MCNP code were used for the calculation of the dose rate level outside the cask and the design improvement was applied in the cask to meet the requirements in national stand‐ard .A series of test proved the casks have ability to transport high‐activity sealed sources safely .Calculation results in design are in well concordance with survey results . It demonstrates the rationality and reliability of the methods used in this shielding design .The patent for the design of high‐capacity cobalt source transport casks was obtained .Through the design for cobalt source transport casks ,a good foundation is laid for the self‐reliant design of spent fuel

  14. Reuse inspection refort of the spent fuel cask

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. W.; Seo, K. S.; Ku, J. H.; Lee, J. C.; Bang, K. S.; Min, D. K. [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-04-01

    This is the contract result report performed by KAERI under the contract with KPS for the reuse inspection of the KSC-4 No. 2 cask to receive the license for the reuse of next 5 years. According to the revision of the atomic regulations, all type B package should receive and pass the reuse inspection for every 5 years. This report contains the summary of the reuse inspection project, the details of the inspection methods and evaluation criteria, the documents which submitted to the KINS and the license approved by the KINS. 1 tabs. (Author)

  15. Safety analysis report for packaging (onsite) multicanister overpack cask

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, W.S.

    1997-07-14

    This safety analysis report for packaging (SARP) documents the safety of shipments of irradiated fuel elements in the MUlticanister Overpack (MCO) and MCO Cask for a highway route controlled quantity, Type B fissile package. This SARP evaluates the package during transfers of (1) water-filled MCOs from the K Basins to the Cold Vacuum Drying Facility (CVDF) and (2) sealed and cold vacuum dried MCOs from the CVDF in the 100 K Area to the Canister Storage Building in the 200 East Area.

  16. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  17. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  18. Implications of the Baltimore Rail Tunnel Fire for Full-Scale Testing of Shipping Casks

    Energy Technology Data Exchange (ETDEWEB)

    Halstead, R. J.; Dilger, F.

    2003-02-25

    The U.S. Nuclear Regulatory Commission (NRC) does not currently require full-scale physical testing of shipping casks as part of its certification process. Stakeholders have long urged NRC to require full-scale testing as part of certification. NRC is currently preparing a full-scale casktesting proposal as part of the Package Performance Study (PPS) that grew out of the NRC reexamination of the Modal Study. The State of Nevada and Clark County remain committed to the position that demonstration testing would not be an acceptable substitute for a combination of full-scale testing, scale-model tests, and computer simulation of each new cask design prior to certification. Based on previous analyses of cask testing issues, and on preliminary findings regarding the July 2001 Baltimore rail tunnel fire, the authors recommend that NRC prioritize extra-regulatory thermal testing of a large rail cask and the GA-4 truck cask under the PPS. The specific fire conditions and other aspects of the full-scale extra-regulatory tests recommended for the PPS are yet to be determined. NRC, in consultation with stakeholders, must consider past real-world accidents and computer simulations to establish temperature failure thresholds for cask containment and fuel cladding. The cost of extra-regulatory thermal testing is yet to be determined. The minimum cost for regulatory thermal testing of a legal-weight truck cask would likely be $3.3-3.8 million.

  19. Neuron-specific protein interactions of Drosophila CASK-b are revealed by mass spectrometry

    Directory of Open Access Journals (Sweden)

    Konark eMukherjee

    2014-06-01

    Full Text Available Modular scaffolding proteins are designed to have multiple interactors. CASK, a member of the membrane-associated guanylate kinase (MAGUK superfamily, has been shown to have roles in many tissues, including neurons and epithelia. It is likely that the set of proteins it interacts with is different in each of these diverse tissues. In this study we asked if within the Drosophila central nervous system, there were neuron-specific sets of CASK-interacting proteins. A YFP-tagged CASK transgene was expressed in genetically defined subsets of neurons in the Drosophila brain known to be important for CASK function, and proteins present in an anti-GFP immunoprecipitation were identified by mass spectrometry. Each subset of neurons had a distinct set of interacting proteins, suggesting that CASK participates in multiple protein networks and that these networks may be different in different neuronal circuits. One common set of proteins was associated with mitochondria, and we show here that endogenous CASK co-purifies with mitochondria. We also determined CASK posttranslational modifications for one cell type, supporting the idea that this technique can be used to assess cell- and circuit-specific protein modifications as well as protein interaction networks.

  20. Documentation for initial testing and inspections of Beneficial Uses Shipping System (BUSS) Cask

    Energy Technology Data Exchange (ETDEWEB)

    Lundeen, J.E.

    1994-08-25

    The purpose of this report is to compile data generated during the initial tests and inspections of the Beneficial Uses Shipping System (BUSS) Cask. In addition, this report will verify that the testing criteria identified in section 8.1 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met. The BUSS Cask Model R-1 is a type B shipping container used for shipment of radioactive cesium-137 and strontium-90 capsules to Waste Encapsulation and Storage Facility (WESF). The BUSS Cask body and lid are each one-piece forgings fabricated from ASTM A473, Type 304 stainless steel. The primary purpose of the BUSS Cask is to provide shielding and confinement as well as impact, puncture, and thermal protection for the capsules under both normal and accident conditions. Chapter 8 of the BUSS Cask SARP requires several acceptance tests and inspections, each intended to evaluate the performance of different components of the BUSS Cask system, to be performed before its first use. The results of the tests and inspections required are included in this document.

  1. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System... contractor (Spain). As prescribed in 229.402-70(d), use the following clause: Status of Contractor as a Director Contractor (Spain) (JUN 1997) (a) “Direct Contractor,” as used in this clause, means an...

  2. Contamination transfers during fuel transport cask loading. A concrete situation

    Energy Technology Data Exchange (ETDEWEB)

    Fournel, B.; Turchet, J.P.; Faure, S.; Allinei, P.G. [DEN/DED Centre d' Etudes de Cadarache, 13 - Saint Paul lez Durance (France); Briquet, L. [EDF GENV, 93 - Saint Denis (France); Baubet, D. [SGS Qualitest Industrie, 30 - Pont Saint Esprit (France)

    2002-07-01

    In 1998, a number of contamination cases detected during fuel shipments have been pointed out by the french nuclear safety authority. Wagon and casks external surfaces were partly contaminated upon arrival in Valognes railway terminal. Since then, measures taken by nuclear power plants operators in France and abroad solved the problem. In Germany, a report analyzing the situation in depth has been published in which correctives actions have been listed. In France, EDF launched a large cleanliness program (projet proprete radiologique) in order to better understand contamination transfers mechanisms during power plants exploitation and to list remediation actions to avoid further problems. In this context, CEA Department for Wastes Studies at Cadarache (CEA/DEN/DED) was in charge of a study about contamination transfers during fuel elements loading operations. It was decided to lead experiments for a concrete case. The loading of a transport cask at Tricastin-PWR-1 was followed in november 2000 and different analysis comprising water analysis and smear tests analysis were carried out and are detailed in this paper. Results are discussed and qualitatively compared to those obtained in Philippsburg-BWR, Germany for a similar set of tests. (authors)

  3. Material specification and quality control program for ductile iron spent fuel casks

    Energy Technology Data Exchange (ETDEWEB)

    Rehmer, B.; Frenz, H.; Weidlich, S.; Kuehn, H.D.

    1995-12-31

    In the process of testing spent fuel casks, BAM is gaining a lot of relevant data regarding the quality level of Ductile Cast Iron (DCI). This paper discusses the basic parameters governing the material behavior of ferritic and ferritic-pearlitic DCI and reviews the development of cask quality over the last years. The effect of microstructure and sample size on the fracture toughness of DCI is discussed. The results of a test program show the prominent effect of pearlite content and graphite nodule structure in the mechanical and fracture toughness characteristics of DCI. This observation is important for quality assurance programs for shipping and storage casks of radioactive materials.

  4. CASKET: a computer code system for thermal and structural analyses of radioactive material transport and/or storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Ikushima, Takeshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-05-01

    A computer code system CASKET (CASK thermal and structural analyses and Evaluation code system) for the thermal and structural analyses which are indispensable for radioactive material transport and/or storage cask designs has been developed. The CASKET is a simplified computer code system to perform parametric analyses on sensitivity evaluations in designing a cask and conducting its safety analysis. Main features of the CASKET are as follow: (1) it is capable to perform impact analysis of casks with shock absorbers, (2) it is capable to perform impact analysis of casks with fins. (3) puncture analysis of casks is capable, (4) rocking analysis of casks during seismic load is capable, (5) material property data library are provided for impact analysis of casks, (6) material property data library are provided for thermal analysis of casks, (7) fin energy absorption data library are provided for impact analysis of casks with fins are and (8) not only main frame computers (OS MSP) but also work stations (OS UNIX) and personal computers (OS Windows 3.1) are available. In the paper, brief illustrations of calculation methods are presented. Some calculation results are compared with experimental ones to confirm the computer programs are useful for thermal and structural analyses. (author)

  5. CASKET: a computer code system for thermal and structural analyses of radioactive material transport and/or storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Ikushima, Takeshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-05-01

    A computer code system CASKET (CASK thermal and structural analyses and Evaluation code system) for the thermal and structural analyses which are indispensable for radioactive material transport and/or storage cask designs has been developed. The CASKET is a simplified computer code system to perform parametric analyses on sensitivity evaluations in designing a cask and conducting its safety analysis. Main features of the CASKET are as follow: (1) it is capable to perform impact analysis of casks with shock absorbers, (2) it is capable to perform impact analysis of casks with fins. (3) puncture analysis of casks is capable, (4) rocking analysis of casks during seismic load is capable, (5) material property data library are provided for impact analysis of casks, (6) material property data library are provided for thermal analysis of casks, (7) fin energy absorption data library are provided for impact analysis of casks with fins are and (8) not only main frame computers (OS MSP) but also work stations (OS UNIX) and personal computers (OS Windows 3.1) are available. In the paper, brief illustrations of calculation methods are presented. Some calculation results are compared with experimental ones to confirm the computer programs are useful for thermal and structural analyses. (author)

  6. Evaluation of FSV-1 cask for the transport of LWR irradiated fuel assemblies

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The Model FSV-1 spent fuel shipping cask was designed by General Atomic Company (GA) to service the Fort St. Vrain (FSV) nuclear generating station, a High Temperature Gas Reactor (HTGR) owned and operated by Public Service Company of Colorado (PSC). This report presents an evaluation of the suitability of the FSV-1 cask for the transport of irradiated Light Water Reactor (LWR) fuel assemblies from both Pressurized Water Reactors (PWR) and Boiling Water Reactors (BWR). The FSV-1 cask evaluation parameters covered a wide spectrum of LWR fuel assemblies, based on burnup in Megawatt Days/Metric Ton of Heavy Metal (MWD/MTHM) and years of decay since irradiation. The criteria for suitability included allowable radiation dose rates, cask surface and interior temperatures and the Gross Vehicle Weight (GVW) of the complete shipping system.

  7. Tandem SAM Domain Structure of Human Caskin1: A Presynaptic, Self-Assembling Scaffold for CASK

    Energy Technology Data Exchange (ETDEWEB)

    Stafford, Ryan L.; Hinde, Elizabeth; Knight, Mary Jane; Pennella, Mario A.; Ear, Jason; Digman, Michelle A.; Gratton, Enrico; Bowie, James U. (UCI); (UCLA)

    2012-02-07

    The synaptic scaffolding proteins CASK and Caskin1 are part of the fibrous mesh of proteins that organize the active zones of neural synapses. CASK binds to a region of Caskin1 called the CASK interaction domain (CID). Adjacent to the CID, Caskin1 contains two tandem sterile a motif (SAM) domains. Many SAM domains form polymers so they are good candidates for forming the fibrous structures seen in the active zone. We show here that the SAM domains of Caskin1 form a new type of SAM helical polymer. The Caskin1 polymer interface exhibits a remarkable segregation of charged residues, resulting in a high sensitivity to ionic strength in vitro. The Caskin1 polymers can be decorated with CASK proteins, illustrating how these proteins may work together to organize the cytomatrix in active zones.

  8. A method for determining the spent-fuel contribution to transport cask containment requirements

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, T.L.; Seager, K.D. [Sandia National Labs., Albuquerque, NM (United States); Rashid, Y.R.; Barrett, P.R. [ANATECH Research Corp., La Jolla, CA (United States); Malinauskas, A.P. [Oak Ridge National Lab., TN (United States); Einziger, R.E. [Pacific Northwest Lab., Richland, WA (United States); Jordan, H. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Duffey, T.A.; Sutherland, S.H. [APTEK, Inc., Colorado Springs, CO (United States); Reardon, P.C. [GRAM, Inc., Albuquerque, NM (United States)

    1992-11-01

    This report examines containment requirements for spent-fuel transport containers that are transported under normal and hypothetical accident conditions. A methodology is described that estimates the probability of rod failure and the quantity of radioactive material released from breached rods. This methodology characterizes the dynamic environment of the cask and its contents and deterministically models the peak stresses that are induced in spent-fuel cladding by the mechanical and thermal dynamic environments. The peak stresses are evaluated in relation to probabilistic failure criteria for generated or preexisting ductile tearing and material fractures at cracks partially through the wall in fuel rods. Activity concentrations in the cask cavity are predicted from estimates of the fraction of gases, volatiles, and fuel fines that are released when the rod cladding is breached. Containment requirements based on the source term are calculated in terms of maximum permissible volumetric leak rates from the cask. Calculations are included for representative cask designs.

  9. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization....... It underlines that governance is increasingly taking place through a set of (quasi-) markets, it is marked by entrepreneurial values, and a hands off approach to governance. We then discuss the way this overall change is reflected in and reinforced by the role of private security contractors in Darfur. Drawing...... at these processes is necessary to understand the role of private security contractors in Darfur. But more than this, practices in Darfur entrench neo-liberal governmentality in security more generally. The managerial and `de-politicizing' approach to security in Darfur displaces alternative views not only...

  10. Evaluation of computer programs used for structural analyses of impact response of spent fuel shipping casks

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, B A; Gwinn, K W

    1984-05-01

    This report presents the results of a study of impact analyses of a generic spent-fuel cask. The study compares the use and results of three different finite element computer codes. Seven different cask-like model analyses are considered. The models encompass both linear and nonlinear geometric and material behavior. On the basis of the analyses results, this report recommends what parameters are useful in the comparison of different structural finite element computer programs. 5 references, 36 figures, 11 tables.

  11. NRC approves spent-fuel cask for general use: Who needs Yucca Mountain?

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, J.

    1993-07-01

    The Nuclear Regulatory Commission (NRC) on April 7, 1993, added Pacific Sierra Nuclear Associates`s (PSNA`s) VSC-24 spent-fuel container to its list of approved storage casks. Unlike previously approved designs, however, the cask was made available for use by utilities without site-specific approval. The VSC-24 (ventilated storage cask) is a 130-ton, 16-foot high vertical storage container composed of a ventilated concrete cask (VCC) housing a steel multi-assembly sealed basket (MSB). A third component, a transfer cask (MTC), shields, supports, and protects the MSB during fuel loading and VCC loading operations. The VCC is a cylindrical reinforced-concrete cask 29 inches thick, with a 1.75-inch-thick A 36 steel liner. The cask contains eight vents-four on the top and four on the bottom-to provide for MSB (and fuel rod) cooling. Its concrete shell provides protection against shearing and penetration by tornado projectiles, protects the MSB in the event of a drop or tipover, and is designed to withstand internal temperatures of 350 degrees Farenheit. The VCC is closed with a bolted-down cover of 0.75-inch-thick A 36 steel. The MSB, which provides the primary boundary for 24 spent fuel rods, is a cylindrical steel shell with a thick shield plug and steel cover plates welded at each end. The shell and covers are constructed from SA 516 Grade 70 pressure vessel steel. Fuel is housed in a basket fabricated from SA 516 Grade 70 sheet steel. Penetrations in the MSB`s structural and shield lids allow for vacuum drying and backfilling with helium after fuel loading. Although its manufacturer claims a design life of 50 years, the NRC has licensed the VSC-24 cask for 20 years.

  12. Criticality Safety Analysis Of As-loaded Spent Nuclear Fuel Casks

    Energy Technology Data Exchange (ETDEWEB)

    Banerjee, Kaushik [ORNL; Scaglione, John M [ORNL

    2015-01-01

    The final safety analysis report (FSAR) or the safety analysis report (SAR) for a particular spent nuclear fuel (SNF) cask system documents models and calculations used to demonstrate that a system meets the regulatory requirements under all normal, off-normal, and accident conditions of spent fuel storage, and normal and accident conditions of transportation. FSAR/SAR calculations and approved content specifications are intended to be bounding in nature to certify cask systems for a variety of fuel characteristics with simplified SNF loading requirements. Therefore, in general, loaded cask systems possess excess and uncredited criticality margins (i.e., the difference between the licensing basis and the as-loaded calculations). This uncredited margin could be quantified by employing more detailed cask-specific evaluations that credit the actual as-loaded cask inventory, and taking into account full (actinide and fission product) burnup credit. This uncredited criticality margin could be potentially used to offset (1) uncertainties in the safety basis that needs to account for the effects of system aging during extended dry storage prior to transportation, and (2) increases in SNF system reactivity over a repository performance period (e.g., 10,000 years or more) as the system undergoes degradation and internal geometry changes. This paper summarizes an assessment of cask-specific, as-loaded criticality margins for SNF stored at eight reactor sites (215 loaded casks were analyzed) under fully flooded conditions to assess the margins available during transportation after extended storage. It is observed that the calculated keff margin varies from 0.05 to almost 0.3 Δkeff for the eight selected reactor sites, demonstrating that significant uncredited safety margins are present. In addition, this paper evaluates the sufficiency of this excess margin in applications involving direct disposal of currently loaded SNF casks.

  13. Criticality Safety Analysis Of As-loaded Spent Nuclear Fuel Casks

    Energy Technology Data Exchange (ETDEWEB)

    Banerjee, Kaushik [ORNL; Scaglione, John M [ORNL

    2015-01-01

    The final safety analysis report (FSAR) or the safety analysis report (SAR) for a particular spent nuclear fuel (SNF) cask system documents models and calculations used to demonstrate that a system meets the regulatory requirements under all normal, off-normal, and accident conditions of spent fuel storage, and normal and accident conditions of transportation. FSAR/SAR calculations and approved content specifications are intended to be bounding in nature to certify cask systems for a variety of fuel characteristics with simplified SNF loading requirements. Therefore, in general, loaded cask systems possess excess and uncredited criticality margins (i.e., the difference between the licensing basis and the as-loaded calculations). This uncredited margin could be quantified by employing more detailed cask-specific evaluations that credit the actual as-loaded cask inventory, and taking into account full (actinide and fission product) burnup credit. This uncredited criticality margin could be potentially used to offset (1) uncertainties in the safety basis that needs to account for the effects of system aging during extended dry storage prior to transportation, and (2) increases in SNF system reactivity over a repository performance period (e.g., 10,000 years or more) as the system undergoes degradation and internal geometry changes. This paper summarizes an assessment of cask-specific, as-loaded criticality margins for SNF stored at eight reactor sites (215 loaded casks were analyzed) under fully flooded conditions to assess the margins available during transportation after extended storage. It is observed that the calculated keff margin varies from 0.05 to almost 0.3 Δkeff for the eight selected reactor sites, demonstrating that significant uncredited safety margins are present. In addition, this paper evaluates the sufficiency of this excess margin in applications involving direct disposal of currently loaded SNF casks.

  14. Operations manual for the Beneficial Uses Shipping System cask. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Bronowski, D.R.; Yoshimura, H.R.

    1993-04-01

    This document is the Operations Manual for the Beneficial Uses Shipping System (BUSS) cask. These operating instructions address requirements; for loading, shipping, and unloading, supplementing general operational information found in the BUSS Safety Analysis Report for Packaging (SARP), SAND 83-0698. Use of the BUSS cask is authorized by Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) for the shipment of special form cesium chloride or strontium flouride capsules.

  15. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  16. Estimation of terrorist attack resistibility of dual-purpose cask TP-117 with DU (depleted uranium) gamma shield

    Energy Technology Data Exchange (ETDEWEB)

    Alekseev, O.G.; Matveev, V.Z.; Morenko, A.I.; Il' kaev, R.I.; Shapovalov, V.I. [Russian Federal Nuclear Center - All-Russian Research Inst. of Experimental Physics, Sarov (Russian Federation)

    2004-07-01

    Report is devoted to numerical research of dual-purpose unified cask (used for SFA transportation and storage) resistance to terrorist attacks. High resistance of dual-purpose unified cask has been achieved due to the unique design-technological solutions and implementation of depleted uranium in cask construction. In suggested variant of construction depleted uranium fulfils functions of shielding and constructional material. It is used both in metallic and cermet form (basing on steel and depleted uranium dioxide). Implementation of depleted uranium in cask construction allows maximal load in existing overall dimensions of the cask. At the same time: 1) all safety requirements (IAEA) are met, 2) dual-purpose cask with SFA has high resistance to terrorist attacks.

  17. SCANS (Shipping Cask ANalysis System) a microcomputer-based analysis system for shipping cask design review: User`s manual to Version 3a. Volume 1, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Mok, G.C.; Thomas, G.R.; Gerhard, M.A.; Trummer, D.J.; Johnson, G.L. [Lawrence Livermore National Lab., CA (United States)

    1998-03-01

    SCANS (Shipping Cask ANalysis System) is a microcomputer-based system of computer programs and databases developed at the Lawrence Livermore National Laboratory (LLNL) for evaluating safety analysis reports on spent fuel shipping casks. SCANS is an easy-to-use system that calculates the global response to impact loads, pressure loads and thermal conditions, providing reviewers with an independent check on analyses submitted by licensees. SCANS is based on microcomputers compatible with the IBM-PC family of computers. The system is composed of a series of menus, input programs, cask analysis programs, and output display programs. All data is entered through fill-in-the-blank input screens that contain descriptive data requests. Analysis options are based on regulatory cases described in the Code of Federal Regulations 10 CFR 71 and Regulatory Guides published by the US Nuclear Regulatory Commission in 1977 and 1978.

  18. COBRA-SFS modifications and cask model optimization

    Energy Technology Data Exchange (ETDEWEB)

    Rector, D.R.; Michener, T.E.

    1989-01-01

    Spent-fuel storage systems are complex systems and developing a computational model for one can be a difficult task. The COBRA-SFS computer code provides many capabilities for modeling the details of these systems, but these capabilities can also allow users to specify a more complex model than necessary. This report provides important guidance to users that dramatically reduces the size of the model while maintaining the accuracy of the calculation. A series of model optimization studies was performed, based on the TN-24P spent-fuel storage cask, to determine the optimal model geometry. Expanded modeling capabilities of the code are also described. These include adding fluid shear stress terms and a detailed plenum model. The mathematical models for each code modification are described, along with the associated verification results. 22 refs., 107 figs., 7 tabs.

  19. The application of fracture mechanics to the safety assessment of transport casks for radioactive materials

    Energy Technology Data Exchange (ETDEWEB)

    Zencker, U.; Mueller, K.; Droste, B.; Roedel, R.; Voelzke, H. [Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin (Germany)

    2004-07-01

    BAM is the German responsible authority for the mechanical and thermal design safety assessment of packages for the transport of radioactive materials. The assessment has to cover the brittle fracture safety proof of package components made of potentially brittle materials. This paper gives a survey of the regulatory and technical requirements for such an assessment according to BAM's new ''Guidelines for the Application of Ductile Cast Iron for Transport and Storage Casks for Radioactive Materials''. Based on these guidelines higher stresses than before can become permissible, but it is necessary to put more effort into the safety assessment procedure. The fundamentals of such a proof with the help of the methods of fracture mechanics are presented. The recommended procedure takes into account the guidelines of the IAEA Advisory Material which are based on the prevention of crack initiation. Examples of BAM's research and safety assessment practices are given. Recommendations for further developments towards package designs with higher acceptable stress levels will be concluded.

  20. Challenges and opportunities facing contractors in Ghana

    OpenAIRE

    Laryea, Samuel Amartei

    2010-01-01

    The main aim of this study was to ascertain and discuss the current challenges and opportunities facing construction contractors in Ghana. This involved a review of the economic, legal and political environments in which contractors in Ghana operate; a review of published studies on construction in developing countries generally and Ghana specifically; and in-depth interviews and discussions with seven building and civil engineering contractors in Ghana in 2009 and 2010. Six road contractors ...

  1. 45 CFR 5b.12 - Contractors.

    Science.gov (United States)

    2010-10-01

    ... must contain a provision requiring the contractor to comply with the Act and this part. (b) All... beyond that date. (c) A contractor and any employee of such contractor shall be considered employees of... employee standards of conduct listed in appendix A of this part where the contract contains a...

  2. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an...

  3. 49 CFR 199.115 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by...

  4. Structural analysis of a metal spent-fuel storage cask in an aircraft crash for risk assessment

    Energy Technology Data Exchange (ETDEWEB)

    Almomani, Belal, E-mail: balmomani@kaist.ac.kr [Department of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, 291 Daehak-ro, Yuseong-gu, Daejeon 305-701 (Korea, Republic of); Lee, Sanghoon, E-mail: shlee1222@kmu.ac.kr [Department of Mechanical and Automotive Engineering, Keimyung University, Dalgubeol-daero 1095, Dalseo-gu, Daegu (Korea, Republic of); Kang, Hyun Gook, E-mail: hyungook@kaist.ac.kr [Department of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, 291 Daehak-ro, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2016-11-15

    Highlights: • Several engine-applied loads with different locations of impact on the storage cask body were implemented. • Cask structural responses due to the influence of engine impact loadings were analyzed. • Leakage path areas from lid closure openings were numerically calculated. • Release fractions that depend on the generated seal opening areas and fuel damage ratios were estimated. - Abstract: Evaluations of the impact resistance of a dry storage cask under mechanical impact loadings resulting from a large commercial aircraft crash have become an important issue for designers and evaluators, in order to promote interim dry storage activities and to evaluate design safety margins. This study presents a method to evaluate the structural integrity of a generic metal cask subjected to various mechanical loading conditions, which represent aircraft engine impacts, on different locations of the cask body. Thirty representative impact conditions are analyzed to provide a comprehensive evaluation of cask damage response. The applied engine impact load–time functions were carefully re-derived by utilizing CRIEPI’s proposed curve through Riera’s approach for six impact velocities, and applied to five locations on a freestanding cask: lateral impacts on the lower half, center of gravity, and upper half of the cask body, corner impact on the lid closure, and vertical impact on the center of the lid closure. A nonlinear dynamic finite element analysis is performed to evaluate the dynamic response of the cask lid closure system and to calculate the lid gaps. The release fractions from the cask to the environment for each impact condition are preliminarily estimated by referring to a proposed methodology from literature. It is believed that this paper presents a systematic process to connect the mechanical analysis of a cask response at the moment of aircraft engine impact with its radiological consequence analysis.

  5. Contractor Prequalification Based on Neural Networks

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jin-long; YANG Lan-rong

    2002-01-01

    Contractor Prequalification involves the screening of contractors by a project owner, according to a given set of criteria, in order to determine their competence to perform the work if awarded the construction contract. This paper introduces the capabilities of neural networks in solving problems related to contractor prequalification. The neural network systems for contractor prequalification has an input vector of 8 components and an output vector of 1 component. The output vector represents whether a contractor is qualified or not qualified to submit a bid on a project.

  6. IT Barometer survey, Denmark

    DEFF Research Database (Denmark)

    Howard, Rob

    1998-01-01

    Survey results from Danish architects, engineers, contractors and property managers in the construction industry concerning their use of computers, communications, problems and needs.......Survey results from Danish architects, engineers, contractors and property managers in the construction industry concerning their use of computers, communications, problems and needs....

  7. Private Security Contractors in Darfur

    OpenAIRE

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization of security alters security practices (including those involving states) than in thinking about their impact on an idealised public monopoly on the use of force. To make its point, the article begins b...

  8. Activation analysis of dual-purpose metal cask after the end of design lifetime for decommission

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Man; Ku, Ji Young; Dho Ho Seog; Cho, Chun Hyung [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of); Ko, Jae Hun [Korea Nuclear Engineering and Service Co., Daejeon (Korea, Republic of)

    2016-12-15

    The Korea Radioactive Waste Agency (KORAD) has developed a dual-purpose metal cask for the dry storage of spent nuclear fuel that has been generated by domestic light-water reactors. The metal cask was designed in compliance with international and domestic technology standards, and safety was the most important consideration in developing the design. It was designed to maintain its integrity for 50 years in terms of major safety factors. The metal cask ensures the minimization of waste generated by maintenance activities during the storage period as well as the safe management of the waste. An activation evaluation of the main body, which includes internal and external components of metal casks whose design lifetime has expired, provides quantitative data on their radioactive inventory. The radioactive inventory of the main body and the components of the metal cask were calculated by applying the MCNP5·ORIGEN-2 evaluation system and by considering each component's chemical composition, neutron flux distribution, and reaction rate, as well as the duration of neutron irradiation during the storage period. The evaluation results revealed that 10 years after the end of the cask's design life, {sup 60}Co had greater radioactivity than other nuclides among the metal materials. In the case of the neutron shield, nuclides that emit high-energy gamma rays such as {sup 28}Al and {sup 24}Na had greater radioactivity immediately after the design lifetime. However, their radioactivity level became negligible after six months due to their short half-life. The surface exposure dose rates of the canister and the main body of the metal cask from which the spent nuclear fuel had been removed with expiration of the design lifetime were determined to be at very low levels, and the radiation exposure doses to which radiation workers were subjected during the decommissioning process appeared to be at insignificant levels. The evaluations of this study strongly suggest that

  9. Cooling Performance Evaluation of the Hybrid Heat Pipe for Spent Nuclear Fuel Dry Storage Cask

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Yeong Shin; Bang, In Cheol [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    To evaluate the concept of the cooling device, 2-step CFD analysis was conducted for the cooling performance of hybrid heat pipe, which consists of single fuel assembly model and full scope dry cask model. As a passive cooling device of the metal cask for dry storage of spent nuclear fuel, hybrid heat pipe was applied to DPC developed in Korea. Hybrid heat pipe is the heat pipe containing neutron absorber can be used as a passive cooling in nuclear application with both decay heat removal and control the reactivity. In this study, 2-step CFD analysis was performed to find to evaluate the heat pipe-based passive cooling system for the application to the dry cask. Only spent fuel pool cannot satisfy the demands for high burnup fuel and large amount of spent fuel. Therefore, it is necessary to prepare supplement of the storage facilities. As one of the candidate of another type of storage, dry storage method have been preferred due to its good expansibility of storage capacity and easy long-term management. Dry storage uses the gas or air as coolant with passive cooling and neutron shielding materials was used instead of water in wet storage system. It is relatively safe and emits little radioactive waste for the storage. As short term actions for the limited storage capacity of spent fuel pool, it is considered to use dry interim/long term storage method to increase the capacity of spent nuclear fuel storage facilities. For 10-year cooled down spent fuel in the pool storage, fuel rod temperature inside metal cask is expected over 250 .deg. C in simulation. Although it satisfied the criteria that cladding temperature of the spent fuel should keep under 400 .deg. C during storage period, high temperature inside cask can accelerate the thermal degradation of the structural materials consisting metal cask and fuel assembly as well as limitation of the storage capacity of metal cask. In this paper, heat pipe-based cooling device for the dry storage cask was suggested for

  10. Conceptual Design Report Cask Loadout Sys and Cask Drop Redesign for the Immersion Pail Support Structure and Operator Interface Platform at 105 K West

    Energy Technology Data Exchange (ETDEWEB)

    LANGEVIN, A.S.

    1999-07-12

    This conceptual design report documents the redesign of the IPSS and the OIP in the 105 KW Basin south loadout pit due to a postulated cask drop accident, as part of Project A.5/A.6, Canister Transfer Facility Modifications. Project A.5/A.6 involves facility modifications needed to transfer fuel from the basin into the cask-MCO. The function of the IPSS is to suspend, guide, and position the immersion pail. The immersion pail protects the cask-MCO from contamination by basin water and acts as a lifting device for the cask-MCO. The OIP provides operator access to the south loadout pit. Previous analyses studied the effects of a cask-MCO drop on the south loadout pit concrete structure and on the IPSS. The most recent analysis considered the resulting loads at the pit slab/wall joint (Kanjilal, 1999). This area had not been modeled previously, and the analysis results indicate that the demand capacity exceeds the allowable at the slab/wall joint. The energy induced on the south loadout pit must be limited such that the safety class function of the basin is maintained. The solution presented in this CDR redesigns the IPSS and the OIP to include impact-absorbing features that will reduce the induced energy. The impact absorbing features of the new design include: Impact-absorbing material at the IPSS base and at the upper portion of the IPSS legs. A sleeve which provides a hydraulic means of absorbing energy. Designing the OIP to act as an impact absorber. The existing IPSS structure in 105 KW will be removed. This conceptual design considers only loads resulting from drops directly over the IPSS and south loadout pit area. Drops in other areas of the basin are not considered, and will be covered as part of a future revision to this CDR.

  11. A Structural Analytic Evaluation of a Connote Pad In a Spent Fuel Dry Storage Cask

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Hak; Seo, Ki Seog; Lee, Ju Chan [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Lee, Yeon Do; Cho, Chun Hyung; Lee, Dae Ki [Nuclear Environment Technology Institute, Daejeon (Korea, Republic of)

    2006-06-15

    A spent fuel storage cask is required to prove the safety of a canister under a hypothetical accidental drop condition. A hypothetical accidental drop condition means that a canister is assumed to be a lee drop on to a pad of the storage cask during loading it into a storage cask. A pad of the storage cask absorbs shock to maintain the structural integrities of a canister under a hypothetical accidental drop condition. In this paper a finite element analysis for various pad structures was carried out to improve the structural integrity of a canister under a hypothetical accidental drop condition. A pad of a storage cask was designed a steel structure with concrete. The 1/4 height of a pad was modified with a structure composed of a steel and a polyurethane foam as a impact limiter. The effect of a shape of a steel structure was studied. The effects of the thickness of a steel structure and the density of a polyurethane foam was also studied.

  12. Structural evaluation and analysis under normal conditions for spent fuel concrete storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Taechul; Baeg, Changyeal; Yoon, Sitae [Korea Radioactive waste Management Agency, Daejeon (Korea, Republic of); Jung, Insoo [Korea Nuclear Engineering and Service Co., Daejeon (Korea, Republic of)

    2014-05-15

    The purpose of this paper is the verification of stabilities of the structural elements that influence the safety of a concrete storage cask. The evaluation results were reviewed with respect to every design criterion, in terms of whether the results satisfy the criteria, provided by 10CFR 72 and NUREG-1536. The basic information on the design is partially explained in 2. Description of spent fuel storage system and the maintainability and assumptions included in the analysis were confirmed through detailed explanations of the acceptable standards, analysis model, and analysis method. ABAQUS 6.10, a widely used finite element analysis program, was used in the structural analysis. The storage cask shall maintain the sub-criticality, shielding, structural integrity, thermal capability and confinement in accordance with the requirements specified in US 10 CFR 72. The safety of storage cask is analyzed and it has been confirmed to meet the requirements of US 10 CFR 72. This paper summarizes the structural stability evaluation results of a concrete storage cask with respect to the design criteria. The evaluation results of this paper show that the maximum stress was below the allowable stress under every condition, and the concrete storage cask satisfied the design criteria.

  13. Documentation for fiscal year 1995 annual BUSS cask SARP testing and inspections

    Energy Technology Data Exchange (ETDEWEB)

    Saueressig, P.T.

    1994-11-08

    The purpose of this report is to compile the data generated during the Fiscal Year (FY) 1995 annual tests and inspections performed on the Beneficial Uses Shipping System (BUSS) cask. The BUSS Cask Model R-1 is a type B shipping container used for shipment of radioactive cesium-137 and strontium-90 capsules to Waste Encapsulation and Storage Facility (WESF). The primary purpose of the BUSS Cask is to provide shielding and confinement as well as impact, puncture, and thermal protection for the capsules under both normal and accident conditions. Section 8.2 ``Maintenance and Periodic Inspection Program`` of the BUSS Cask SARP requires that the following tests and inspections be performed on an annual basis: hydrostatic pressure test; helium leak test; dye penetrant test on the trunnions and life lugs; torque test on all permanent bolts; and impact limiter inspection and weight test. In addition to compiling the generated data, this report will verify that the testing criteria identified in section 8.2 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met.

  14. Safety analysis report vitrified high level waste type B shipping cask

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Safety Analysis Report describes the design, analyses, and principle features of the Vitrified High Level Waste (VHLW) Cask. In preparing this report a detailed evaluation of the design has been performed to ensure that all safety, licensing, and operational goals for the cask and its associated Department of Energy program can be met. The functions of this report are: (1) to fully document that all functional and regulatory requirements of 10CFR71 can be met by the package; and (2) to document the design and analyses of the cask for review by the Nuclear Regulatory Commission. The VHLW Cask is the reusable shipping package designed by GNSI under Department of Energy contract DE-AC04-89AL53-689 for transportation of Vitrified High Level Waste, and to meet the requirements for certification under 10CFR71 for a Type B(U) package. The VHLW cask has been designed as packaging for transport of canisters of Vitrified High Level Waste solidified at Department of Energy facilities.

  15. Study of minimum-weight highway transporters for spent nuclear fuel casks: Technical report

    Energy Technology Data Exchange (ETDEWEB)

    Hoess, J.A.; Drago, V.J.

    1989-05-01

    There are federal and state limits on the maximum tractor-trailer- payload combination and individual axle loads permissible on US highways. These can generally be considered as two sets, i.e., legal-weight and overweight limits. The number of individual shipments required will decrease as the capacity of the spent nuclear fuel cask increases. Thus, there is an incentive for identifying readily available minimum-weight tractors and trailers capable of safely and reliably transporting as large a cask as possible without exceeding the legal gross combination weight (GCW) of 80,000 lb or selected overweight GCW limit of 110,000 lb. This study identifies options for commercially available heavy-duty on-highway tractors and trailers for transporting proposed future loaded spent nuclear fuel casks. Loaded cask weights of 56,000 and 80,000 lb were selected as reference design points for the legal-weight and overweight transporters, respectively. The technical data on tractor and trailer characteristics obtained indicate that it is possible to develop a tractor-trailer combination, tailored for spent nuclear fuel transportation service, utilizing existing technology and commercially available components, capable of safely and reliably transporting 56,000 and 80,000-lb spent nuclear fuel casks without exceeding GCWs of 80,000 and 10,000 lb, respectively. 4 figs., 14 tabs.

  16. Evaluation of Impact Resistance of Concrete Overpack of Storage Cask

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sanghoon; Kim, Ki-Young; Jeon, Je-Eon; Seo, Ki-Seog [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The concrete overpack of the cask provides radiation shielding as well as physical protection for inner canister against external mechanical shock. When the overpack undergoes a severe missile impact which might be caused by tornado or aircraft crash, it should sustain minimal level of structural integrity so that the radiation shielding and the retrievability of canister are maintained. Empirical formulas have been developed for the evaluation of concrete damage but those formulas can be used only for local damage evaluation and not for global damage evaluation. In this research, a series of numerical simulations and tests have been performed to evaluate the damage of two types of concrete overpack segment models under high speed missile impact. It is shown that appropriate modeling of material failure is crucial in this kind of analyses and finding the correct failure parameters may not be straightforward. When comparing the simulation results with the test results, it is shown that neither setting, case 1 and 2 provides results with consistent agreement with test results. That is, case 1 setting is more close to reality in Type 1 model analysis, but for Type 2, case 2 setting provides more close results to the reality. In both the case, not enough deformation is predicted by simulation compared to the tests. Weak failure and eroding criteria give larger penetration depth with insufficient overall damage due to energy loss with element erosion.

  17. Structural design of concrete storage pads for spent-fuel casks

    Energy Technology Data Exchange (ETDEWEB)

    Rashid, Y.R.; Nickell, R.E.; James, R.J. (ANATECH Research Corp., San Diego, CA (United States))

    1993-04-01

    The loading experienced by spent fuel dry storage casks and storage pads due to potential drop or tip-over accidents is evaluated using state-of-the-art concrete structural analysis methodology. The purpose of this analysis is to provide simple design charts and formulas so that design adequacy of storage pads and dry storage casks can be demonstrated. The analysis covers a wide range of slab-design parameters, e.g., reinforcement ratio, slab thickness, concrete compressive strength, and sub-base soil compaction, as well as variations in drop orientation and drop height. The results are presented in the form of curves, giving the force on the cask as a function of storage pad hardness for various drop heights. In addition, force-displacement curves, deformed shapes, crack patterns, stresses and strains are given for various slab-design conditions and drop events. The utility of the results in design are illustrated through examples.

  18. Development of Aircraft Impact Scenario on a Concrete Cask in Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    Momani, Belal Al; Yoo, Min; Kang, Hyun Gook [KAIST, Daejeon (Korea, Republic of)

    2015-05-15

    This paper provides a method for determining the failure criteria in global and local damage responses for the concrete cask under extreme mechanical impact condition. IAEA safety guide No. SSG-15 mentions the hypothetical initiating events of SNF storage. Among the external initiating events, the aircraft strike on a storage cask is considered one of the dominant contributions to the risk during storage phase. Although the probability of aircraft crash on ISF is extremely small, it is important to develop the accident scenario caused by an intentional malicious acts launched towards the storage facility in terms to improve inherent security. Thus, the probabilistic approach to develop aircraft impact scenarios on a storage cask is needed.

  19. Shielding calculation and criticality safety analysis of spent fuel transportation cask in research reactors.

    Science.gov (United States)

    Mohammadi, A; Hassanzadeh, M; Gharib, M

    2016-02-01

    In this study, shielding calculation and criticality safety analysis were carried out for general material testing reactor (MTR) research reactors interim storage and relevant transportation cask. During these processes, three major terms were considered: source term, shielding, and criticality calculations. The Monte Carlo transport code MCNP5 was used for shielding calculation and criticality safety analysis and ORIGEN2.1 code for source term calculation. According to the results obtained, a cylindrical cask with body, top, and bottom thicknesses of 18, 13, and 13 cm, respectively, was accepted as the dual-purpose cask. Furthermore, it is shown that the total dose rates are below the normal transport criteria that meet the standards specified.

  20. Impact of Reactor Operating Parameters on Cask Reactivity in BWR Burnup Credit

    Energy Technology Data Exchange (ETDEWEB)

    Ilas, Germina [ORNL; Betzler, Benjamin R [ORNL; Ade, Brian J [ORNL

    2017-01-01

    This paper discusses the effect of reactor operating parameters used in fuel depletion calculations on spent fuel cask reactivity, with relevance for boiling-water reactor (BWR) burnup credit (BUC) applications. Assessments that used generic BWR fuel assembly and spent fuel cask configurations are presented. The considered operating parameters, which were independently varied in the depletion simulations for the assembly, included fuel temperature, bypass water density, specific power, and operating history. Different operating history scenarios were considered for the assembly depletion to determine the effect of relative power distribution during the irradiation cycles, as well as the downtime between cycles. Depletion, decay, and criticality simulations were performed using computer codes and associated nuclear data within the SCALE code system. Results quantifying the dependence of cask reactivity on the assembly depletion parameters are presented herein.

  1. Labor contractors: a conceptual overview.

    Science.gov (United States)

    Martin, P M

    1996-01-01

    "The purpose of this paper is to provide an overview of labor brokering or contracting that helps to explain why employers turn to foreign workers to fill certain vacant jobs, and how the presence of foreign workers brought to a country by labor contractors can affect the size and duration of migration flows. The major conclusion is that East Asian policies that aim to avoid the settlement of unskilled foreign workers also make labor brokering a prominent feature of labor migration and migrant labor markets in the region."

  2. Safety Analysis of Dual Purpose Metal Cask Subjected to Impulsive Loads due to Aircraft Engine Crash

    Science.gov (United States)

    Shirai, Koji; Namba, Kosuke; Saegusa, Toshiari

    In Japan, the first Interim Storage Facility of spent nuclear fuel away from reactor site is being planned to start its commercial operation around 2010, in use of dual-purpose metal cask in the northern part of Main Japan Island. Business License Examination for safety design approval has started since March, 2007. To demonstrate the more scientific and rational performance of safety regulation activities on each phase for the first license procedure, CREPEI has executed demonstration tests with full scale casks, such as drop tests onto real targets without impact limiters(1) and seismic tests subjected to strong earthquake motions(2). Moreover, it is important to develop the knowledge for the inherent security of metal casks under extreme mechanical-impact conditions, especially for increasing interest since the terrorist attacks from 11th September 2001(3)-(6). This paper presents dynamic mechanical behavior of the metal cask lid closure system caused by direct aircraft engine crash and describes calculated results (especially, leak tightness based on relative dynamic displacements between metallic seals). Firstly, the local penetration damage of the interim storage facility building by a big passenger aircraft engine crash (diameter 2.7m, length 4.3m, weight 4.4ton, impact velocity 90m/s) has been examined. The reduced velocity is calculated by the local damage formula for concrete structure with its thickness of 70cm. The load vs. time function for this reduced velocity (60m/s) is estimated by the impact analysis using Finite Element code LS-DYNA with the full scale engine model onto a hypothetically rigid target. Secondly, as the most critical scenarios for the metal cask, two impact scenarios (horizontal impact hitting the cask and vertical impact onto the lid metallic seal system) are chosen. To consider the geometry of all bolts for two lids, the gasket reaction forces and the inner pressure of the cask cavity, the detailed three dimensional FEM models are

  3. Ageing of a neutron shielding used in transport/storage casks

    Energy Technology Data Exchange (ETDEWEB)

    Nizeyiman, Fidele; Alami, Aatif; Issard, Herve; Bellenger, Veronique [TN International, 1 rue des herons, Montigny le Bretonneux, 78054 Saint Quentin en Yvelines (France); Laboratoire PIMM, Arts and Metiers ParisTech, 151 Bd de l' Hopital, 75013 Paris (France)

    2012-07-11

    In radioactive materials transport/storage casks, a mineral-filled vinylester composite is used for neutron shielding which relies on its hydrogen and boron atoms content. During cask service life, this composite is mainly subjected to three types of ageing: hydrothermal ageing, thermal oxidation and neutron irradiation. The aim of this study is to investigate the effect of hydrothermal ageing on the properties and chemical composition of this polymer composite. At high temperature (120 Degree-Sign C and 140 Degree-Sign C), the main consequence is the strong decrease of mechanical properties induced by the filler/matrix debonding.

  4. TMI-2 (Three-Mile Island-Unit 2) rail cask and railcar maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Tyacke, M.J.; Ayers, A.L., Jr.; Ball, L.J.; Anselmo, A.A.

    1988-02-01

    This paper describes the NuPac 125-B cask system (i.e., cask and railcar), and the maintenance and inspection requirements for that system. The paper discusses the operations being done to satisfy those requirements and how, in some cases, it has been efficient for the operations to be more rigorous than the requirements. Finally, this paper discusses the experiences gained from those operations and how specific hardware and procedural enhancements have resulted in a reliable and continuous shipping campaign. 2 refs., 2 figs.

  5. Seismic and cask drop excitation evaluation of the tower shielding reactor

    Energy Technology Data Exchange (ETDEWEB)

    Harris, S.P.; Stover, R.L.; Johnson, J.J.; Sumodobila, B.N. (EQE, Inc., San Francisco, CA (USA); Oak Ridge National Lab., TN (USA); EQE, Inc., San Francisco, CA (USA))

    1989-01-01

    During the current shutdown of the Tower Shielding Reactor II (TSR-II), analyses were performed to determine the effect of nearby cask drops on the structural and mechanical integrity of the reactor. This evaluation was then extended to include the effects of earthquakes. Several analytic models were developed to simulate the effects of earthquake and cask drop excitation. A coupled soil-structure model was developed. As a result of the analyses, several hardware modifications and enhancements were implemented to ensure reactor integrity during future operations. 6 figs.

  6. A structural analysis on the KN-12 spent nuclear fuel transport casks

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dew Hey [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of); Lee, Young Shin; Ryu, Chung Hyun; Kim, Hyun Su; Lee, Jae Hyung; Na, Jae Yun [Chungnam National Univ., Taejon (Korea, Republic of)

    2001-08-15

    In this study, safety of the spent nuclear fuel cask KN-12 which is developed in 2000 is evaluated for hypothetical accidents conditions such as free drop, puncture, fire accident and water immersion. Finite element code ABAQUS/Explicit is used to compare with safety analysis report of the GNB in which analysis is performed with LS-DYNA3D for hypothetical accident conditions. Through this study, the safety of KN-12 is evaluated by comprehensive structural analysis. The capability and technological advancement of Korean community on the analysis and structural assessment of the cask will be improved. Also people's anxiety about radioactive dangers will be eliminated.

  7. Calcium/calmodulin-dependent serine protein kinase (CASK), a protein implicated in mental retardation and autism-spectrum disorders, interacts with T-Brain-1 (TBR1) to control extinction of associative memory in male mice

    Science.gov (United States)

    Huang, Tzyy-Nan; Hsueh, Yi-Ping

    2017-01-01

    Background Human genetic studies have indicated that mutations in calcium/calmodulin-dependent serine protein kinase (CASK) result in X-linked mental retardation and autism-spectrum disorders. We aimed to establish a mouse model to study how Cask regulates mental ability. Methods Because Cask encodes a multidomain scaffold protein, a possible strategy to dissect how CASK regulates mental ability and cognition is to disrupt specific protein–protein interactions of CASK in vivo and then investigate the impact of individual specific protein interactions. Previous in vitro analyses indicated that a rat CASK T724A mutation reduces the interaction between CASK and T-brain-1 (TBR1) in transfected COS cells. Because TBR1 is critical for glutamate receptor, ionotropic, N-methyl-d-aspartate receptor subunit 2B (Grin2b) expression and is a causative gene for autism and intellectual disability, we then generated CASK T740A (corresponding to rat CASK T724A) mutant mice using a gene-targeting approach. Immunoblotting, coimmunoprecipitation, histological methods and behavioural assays (including home cage, open field, auditory and contextual fear conditioning and conditioned taste aversion) were applied to investigate expression of CASK and its related proteins, the protein–protein interactions of CASK, and anatomic and behavioural features of CASK T740A mice. Results The CASK T740A mutation attenuated the interaction between CASK and TBR1 in the brain. However, CASK T740A mice were generally healthy, without obvious defects in brain morphology. The most dramatic defect among the mutant mice was in extinction of associative memory, though acquisition was normal. Limitations The functions of other CASK protein interactions cannot be addressed using CASK T740A mice. Conclusion Disruption of the CASK and TBR1 interaction impairs extinction, suggesting the involvement of CASK in cognitive flexibility. PMID:28234597

  8. 49 CFR 199.245 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are... Administrator, any DOT agency with regulatory authority over the operator or covered employee, and, if...

  9. 48 CFR 4.102 - Contractor's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4... ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an... be signed by that individual, and the signature shall be followed by the individual's typed,...

  10. Government Contractors - Do We Really Need Them?

    Science.gov (United States)

    2011-03-09

    pictures of drunken scantily clad US Embassy security contractors dancing around a fire while urinating.53 The photos also depicted the men engaged...html (accessed January 31, 2011). 57 Ibid. 58 Gary Schaub Jr. and Volker Franke, ―Contractors as Military Professionals?‖, Parameters 39, no.4

  11. 10 CFR 72.236 - Specific requirements for spent fuel storage cask approval and fabrication.

    Science.gov (United States)

    2010-01-01

    ... REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR... storage cask must be designed to provide adequate heat removal capacity without active cooling systems. (g... ascertain that there are no cracks, pinholes, uncontrolled voids, or other defects that could...

  12. Study on the key technologies of the Transfer Equipment Cask for Tokamak Equator Port Plug

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Buyun, E-mail: ayun@iim.ac.cn [Department of Automation, University of Science and Technology of China, Hefei, Anhui 230027 (China); Robot Sensors and Human-Machine Interaction Laboratory, Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Gao, Lifu [Department of Automation, University of Science and Technology of China, Hefei, Anhui 230027 (China); Robot Sensors and Human-Machine Interaction Laboratory, Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Cao, Huibin; Sun, Jian [Robot Sensors and Human-Machine Interaction Laboratory, Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China); Sun, Yuxiang; Song, Quanjun; Ma, Chengxue; Chang, Li; Shuang, Feng [Department of Automation, University of Science and Technology of China, Hefei, Anhui 230027 (China); Robot Sensors and Human-Machine Interaction Laboratory, Institute of Intelligent Machines, Chinese Academy of Sciences, Hefei, Anhui 230031 (China)

    2014-12-15

    Highlights: • Design on Intelligent Air Transfer System (IATS) for Transfer Equipment Cask (TECA). • A rhombic-like parallel robot for docking with minimum misalignment. • Design on electro-hydraulic servo system of the TECA for Tokamak Equator Port Plug (TEPP) manipulation. • A control architecture with several algorithms and information acquired from sensors could be used by the TECA for Remote Handling (RH). - Abstract: The Transfer Equipment Cask (TECA) is a key solution for Remote Handling (RH) in Tokamak Equator Port Plug (TEPP) operations. From the perspectives of both engineering and technical designs of effective experiments on the TEPP, key technologies on these topics covering the TECA are required. According to conditions in ITER (International Thermonuclear Experimental Reactor) and features of the TEPP, this paper introduces the design of an Intelligent Air Transfer System (IATS) with an adaptive attitude and high precision positioning that transports a cask system of more than 30 tons from the Tokamak Building (TB) to the Hot Cell Building (HCB). Additionally, different actuators are discussed, and the hydraulic power drive is eventually selected and designed. A rhombic-like parallel robot is capable of being used for docking with minimum misalignment. Practical mechanisms of the cask system are presented for hostile environments. A control architecture with several algorithms and information acquired from sensors could be used by the TECA. These designs yield realistic and extended applications for the RH of ITER.

  13. 77 FR 9515 - List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8

    Science.gov (United States)

    2012-02-17

    ... RIN 3150-AJ05 List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8 AGENCY: Nuclear... Commission) is amending its spent fuel storage regulations by revising the Holtec International HI-STORM 100... and safety will be adequately protected. This direct final rule revises the HI-STORM 100 listing in...

  14. A Stylistic Analysis on Edgar Allan Poe's The Cask of Amontillado

    Institute of Scientific and Technical Information of China (English)

    杨赛菲

    2016-01-01

    The Cask of Amontillado is one of Poe's best-known horror short stories. Based on Stylistics, this paper attempts to analyze this story from the aspects of themes, characterization, point of view, syntactic and lexical features, to reveal Poe's excellent skills and the artistic charm.

  15. ITER Transfer Cask System: Status of design, issues and future developments

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez, C. Gonzalez, E-mail: carmen.gonzalez@f4e.europa.e [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Damiani, C.; Irving, M. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Friconneau, J.-P.; Tesini, A. [ITER Organization (IO), CS 90 046, 13067 St Paul Lez Durance Cedex (France); Ribeiro, I.; Vale, A. [Instituto Superior Tecnico (IST), ISR and IPFN, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2010-12-15

    The Remote Handling tasks scheduled during the ITER maintenance shutdown require transportation of in-vessel components from the Vacuum Vessel ports, at all levels of the Tokamak building, to the docking stations in the Hot Cell building. This transfer of radioactive, contaminated components represents a task of unprecedented complexity for a nuclear device like ITER. A Transfer Cask System (TCS) has been adopted as a reference solution. The TCS is a mobile, leak-tight unit, which can be divided into: (1) the cask itself, i.e., the container for the components to be transferred, able to avoid spread of contamination outside its envelope, equipped with in-cask handling devices; (2) the interface pallet that assists the docking operations of the cask and, underneath; (3) an Air Transfer System (ATS), i.e., a mobile platform floating on air-cushions with drive and steering wheels powered by electric motors and batteries on-board. The system will be remotely controlled, moving along previously defined paths. This paper focuses on the present status of the ATS design, the issues to be faced and the future developments foreseen.

  16. Structural dimensioning of dual purpose cask prototype; Dimensionamento estrutural de prototipo de casco de duplo proposito

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Luiz Leite da; Mourao, Rogerio Pimenta; Lopes, Claudio Cunha [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN), Belo Horizonte, MG (Brazil)]. E-mail: silvall@cdtn.br; mouraor@cdtn.br; ccl@cdtn.br

    2005-07-01

    The structural dimensioning of a Type B(U) dual purpose cask prototype is part of the scope of work of the Brazilian institute CDTN in the IAEA regional project involving Latin American countries which operate research reactors (Argentina, Brazil, Chile, Mexico and Peru). In order to meet the dimensional and operational characteristics of the reactor facilities in these countries, a maximum weight of 10.000 kgf and a maximum dimension of 1 m in at least one direction were set for the cask. With these design restrictions, the cask's payload is either 21 MTR or 78 TRIGA fuel elements. The cask's most important components are main body, primary and secondary lids, basket and impact limiters. The main body has a sandwich-like wall with internal and external layers made of AISI 304 stainless steel with lead in-between. The lead provides biological shielding. The primary lid is similarly layered, but in the axial direction. It is provided with a double system of metallic rings and has ports for pressurization, sampling and containment verification. The secondary lid has the main function of protecting the primary lid against mechanical impacts. The basket structure is basically a tube array reinforced by bottom plate, feet and spacers. Square tubes are used for MTR elements and circular tubes for TRIGA elements. Finally, the impact limiters are structures made of an external stainless steel thin covering and a filling made of the wood composite OSB - Oriented Strand Board. The prototype is provided with bottom and top impact limiters, which are attached to each other by means of four threaded rods. The limiters are not rigidly attached to the cask body. A half scale cask model was designed to be submitted to a testing program. As its volume scales down to 1:8, the model weight is 1,250 kgf. This paper presents the methodology for the preliminary structural dimensioning of the critical parameters of the cask prototype. Both normal conditions of operation and

  17. Thermal modeling of a vertical dry storage cask for used nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Li, Jie, E-mail: jieli@anl.gov; Liu, Yung Y., E-mail: yyliu@anl.gov

    2016-05-15

    Graphical abstract: - Highlights: • Thermal performance of a 3-D vertical dry cask under various conditions has been numerically studied by using ANSYS/FLUENT code. • The simulation was validated by comparing the results against data obtained from the temperature measurements of a commercial cask. • The results indicated that the basket with higher thermal conductivity dissipates decay heat out of the cask more efficiently than that with a lower thermal conductivity (aluminum composite vs. stainless steel). A heavier cooling gas is also helpful to enhance heat transfer via enhanced natural convection (N{sub 2} vs. He). • Coolant release from the fuel canister results in temperature change of the canister external surfaces. The simulation shows that such a change is large enough and detectable, which can provide a mechanism for leak detection by continuously monitoring this temperature change at the top center of the canister surface. • Partial blockage of the cask air inlets affects the temperature profiles marginally for both the fuel canister and those components inside. In contrast, fully blocked air inlets will lead to remarkable increases of the component temperatures. - Abstract: Thermal modeling of temperature profiles of dry casks has been identified as a high-priority item in a U.S. Department of Energy gap analysis. In this work, a three-dimensional model of a vertical dry cask has been constructed for computer simulation by using the ANSYS/FLUENT code. The vertical storage cask contains a welded canister for 32 Pressurized Water Reactor (PWR) used-fuel assemblies with a total decay heat load of 34 kW. To simplify thermal calculations, an effective thermal conductivity model for a 17 × 17 PWR used (or spent)-fuel assembly was developed and used in the simulation of thermal performance. The effects of canister fill gas (helium or nitrogen), internal pressure (1–6 atm), and basket material (stainless steel or aluminum alloy) were studied to

  18. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ... SPACE ADMINISTRATION Information Collection; NASA Contractor Financial Management Reports AGENCY... . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management Reporting System is the basic.... Data Title: NASA Contractor Financial Management Reports. OMB Number: 2700-0003. Type of Review...

  19. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system....

  20. Metal cask RT-5000 for the dry storage and transportation of spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Vorobyov, A.I.; Kazeev, V.G.; Krayev, V.S.; Shcherbina, A.N.; Churikov, Y.I. [All-Russian Research Inst. of Technical Physics, Snezhinsk (Russian Federation)

    2003-05-01

    Presentation of new-type cask, developed at RFNC-VNIITF, is in the article. The prototype model of the shipping cask was subjected to tests imitating normal shipment conditions (free fall, pressing, and impact) and to tests imitating emergency situation during shipment (a drop from the 9-m height onto a pin is replaced by acceleration of the shipping cask at a guide rail of the rocket-catapult installation (RCI), a 1-m drop onto a pin, heat tests a 30-minutes fire at the temperature of for 8500 C, submergence to the depth of 15 and 200 meters). After each test the hermeticity preservation is examined. Parallel with the real testing, a mathematical simulation of physical processes induced by the corresponding tests was conducted at the RFNC-VNIITF. The required parameters obtained from the tests are used to calibrate the calculation methods. As a result it has been possible to obtain a good agreement between the results of calculations and experiments; this will allow the mathematic simulation to be used wider. The advantage of the RT-5000 metal cask in comparison with metal-concrete analogs are as follows: SFA are placed into the RT-5000 entirely without cutting into two bunches of fuel elements; the expensive hot doom is not required for automatic cutting the SFA and for loading the bunches of fuel elements into intermediate cases; the possibility remains to transport the RT-5000 without reloading SFA after 50-year storage, although this is a problem for the metal-concrete casks.

  1. PRELIMINARY REPORT: EFFECTS OF IRRADIATION AND THERMAL EXPOSURE ON ELASTOMERIC SEALS FOR CASK TRANSPORTATION AND STORAGE

    Energy Technology Data Exchange (ETDEWEB)

    Verst, C.; Skidmore, E.; Daugherty, W.

    2014-05-30

    A testing and analysis approach to predict the sealing behavior of elastomeric seal materials in dry storage casks and evaluate their ability to maintain a seal under thermal and radiation exposure conditions of extended storage and beyond was developed, and initial tests have been conducted. The initial tests evaluate the aging response of EPDM elastomer O-ring seals. The thermal and radiation exposure conditions of the CASTOR® V/21 casks were selected for testing as this cask design is of interest due to its widespread use, and close proximity of the seals to the fuel compared to other cask designs leading to a relatively high temperature and dose under storage conditions. A novel test fixture was developed to enable compression stress relaxation measurements for the seal material at the thermal and radiation exposure conditions. A loss of compression stress of 90% is suggested as the threshold at which sealing ability of an elastomeric seal would be lost. Previous studies have shown this value to be conservative to actual leakage failure for most aging conditions. These initial results indicate that the seal would be expected to retain sealing ability throughout extended storage at the cask design conditions, though longer exposure times are needed to validate this assumption. The high constant dose rate used in the testing is not prototypic of the decreasingly low dose rate that would occur under extended storage. The primary degradation mechanism of oxidation of polymeric compounds is highly dependent on temperature and time of exposure, and with radiation expected to exacerbate the oxidation.

  2. Behavior of spent fuel and cask components after extended periods of dry storage

    Energy Technology Data Exchange (ETDEWEB)

    Kenneally, R. [U.S. Nuclear Regulatory Commission, Rockville, MD (United States); Kessler, J. [Electric Power Research Inst., Palo Alto, CA (United States)

    2001-07-01

    The U.S. Nuclear Regulatory Commission (NRC) promulgated 10 CFR Part 72, Title 10, for the independent storage of spent nuclear fuel and high-level radioactive waste outside reactor spent fuel pools. Part 72 currently limits the license term for an independent spent fuel storage installation to 20 years from the date of issuance. Licenses may be renewed by the Commission at or before the expiration of the license term. Applications for renewal of a license should be filed at least two years prior to the expiration of the existing license. In preparation for possible license renewal, the NRC Office of Nuclear Material and Safeguards, Spent Fuel Project Office, is developing the technical basis for renewals of licenses and Certificates of Compliance for dry storage systems for spent nuclear fuel and high-level radioactive waste at independent spent fuel storage installation sites. An analysis of past performance of selected components of these systems is required as part of that technical basis. In the years 1980 through the early 1990, the Department of Energy (DOE) procured four prototype dry storage casks for testing at the Idaho National Engineering and Environmental Laboratory (INEEL): Castor-V/21, MC-10, TN-24P, and VSC-17. The primary purpose of the testing was to benchmark thermal and radiological codes and to determine the thermal and radiological characteristics of the casks. A series of examinations in 1999 and early 2000 to investigate the integrity of the Castor V/21 cask were undertaken. There is no evidence of significant degradation of the Castor V/21 cask systems important to safety from the time of initial loading of the cask in 1985 up to the time of testing in 1999. (author)

  3. Second Annual Maintenance, Inspection, and Test Report for PAS-1 Cask Certification for Shipping Payload B

    Energy Technology Data Exchange (ETDEWEB)

    KELLY, D.J.

    2000-10-09

    The Nuclear Packaging, Inc. (NuPac), PAS-1 cask is required to undergo annual maintenance and inspections to retain certification in accordance with U.S. Department of Energy (DOE) Certificate of Compliance USA/9184B(U) (Appendix A). The packaging configuration being tested and maintained is the NuPac PAS-1 cask for Payload B. The intent of the maintenance and inspections is to ensure the packaging remains in unimpaired physical condition. Two casks, serial numbers 2162-026 and 2162-027, were maintained, inspected, and tested at the 306E Development, Fabrication, and Test Laboratory, located at the Hanford Site's 300 Area. Waste Management Federal Services, Inc. (WMFS), a subsidiary of GTS Duratek, was in charge of the maintenance and testing. Cogema Engineering Corporation (Cogema) directed the operations in the test facility. The maintenance, testing, and inspections were conducted successfully with both PAS-1 casks. The work conducted on the overpacks included weighing, gasket replacement, and plastic pipe plug and foam inspections. The work conducted on the secondary containment vessel (SCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, and a helium leak test. The work conducted on the primary containment vessel (PCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, dimensional inspection of the vessel bottom, a helium leak test, and dye penetrant inspection of the welds. The vermiculite material used in the cask rack assembly was replaced.

  4. Thermo-mechanical finite element analyses of bolted cask lid structures

    Energy Technology Data Exchange (ETDEWEB)

    Wieser, G.; Qiao Linan; Eberle, A.; Voelzke, H. [Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin (Germany)

    2004-07-01

    The analysis of complex bolted cask lid structures under mechanical or thermal accident conditions is important for the evaluation of cask integrity and leak-tightness in package design assessment according to the Transport Regulations or in aircraft crash scenarios. In this context BAM is developing methods based on Finite Elements to calculate the effects of mechanical impacts onto the bolted lid structures as well as effects caused by severe fire scenarios. I n case of fire it might be not enough to perform only a thermal heat transfer analysis. The complex cask design in connection with a severe hypothetical time-temperature-curve representing an accident fire scenario will create a strong transient heating up of the cask body and its lid system. This causes relative displacements between the seals and its counterparts that can be analyzed by a so-called thermo-mechanical calculation. Although it is currently not possible to correlate leakage rates with results from deformation analyses directly an appropriate Finite Element model of the considered type of metallic lid seal has been developed. For the present it is possible to estimate the behaviour of the seal based on the calculated relative displacements at its seating and the behaviour of the lid bolts under the impact load or the temperature field respectively. Except of the lid bolts the geometry of the cask and the mechanical loading is axial-symmetric which simplifies the analysis considerably and a two-dimensional Finite Element model with substitute lid bolts may be used. The substitute bolts are modelled as one-dimensional truss or beam elements. An advanced two-dimensional bolt submodel represents the bolts with plane stress continuum elements. This paper discusses the influence of different bolt modelling on the relative displacements at the seating of the seals. Besides this, the influence of bolt modelling, thermal properties and detail in geometry of the two-dimensional Finite Element models on

  5. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  6. Releasable activity and maximum permissible leakage rate within a transport cask of Tehran Research Reactor fuel samples

    Directory of Open Access Journals (Sweden)

    Rezaeian Mahdi

    2015-01-01

    Full Text Available Containment of a transport cask during both normal and accident conditions is important to the health and safety of the public and of the operators. Based on IAEA regulations, releasable activity and maximum permissible volumetric leakage rate within the cask containing fuel samples of Tehran Research Reactor enclosed in an irradiated capsule are calculated. The contributions to the total activity from the four sources of gas, volatile, fines, and corrosion products are treated separately. These calculations are necessary to identify an appropriate leak test that must be performed on the cask and the results can be utilized as the source term for dose evaluation in the safety assessment of the cask.

  7. Safety assessment technology on the free drop impact and puncture analysis of the cask for radioactive material transport

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dew Hey [Korea Institute of Nuclear Safety, Taejon (Korea, Republic of); Lee, Young Shin; Ryu, Chung Hyun; Kim, Hyun Su; Lee, Ho Chul; Hong, Song Jin; Choi, Young Jin; Lee, Jae Hyung; Na, Jae Yun [Chungnam National Univ., Taejon (Korea, Republic of)

    2001-03-15

    In this study, the regulatory condition and analysis condition is analyzed for the free drop and puncture impact analysis to develop the safety assessment technology. Impact analysis is performed with finite element method which is one of the many analysis methods of the shipping cask. LS-DYNA3D and ABAQUS is suitable for the free drop and the puncture impact analysis of the shipping cask. For the analysis model, the KSC-4 that is the shipping cask to transport spent nuclear fuel is investigated. The results of both LS-DYNA3D and ABAQUS is completely corresponded. And The integrity of the shipping cask is verified. Using this study, the reliable safety assessment technology is supplied to the staff. The efficient and reliable regulatory tasks is performed using the standard safety assessment technology.

  8. Feasibility Study For Use Of Commercial Cask Vendor Dry Transfer Systems To Unload Used Fuel Assemblies In L-Area

    Energy Technology Data Exchange (ETDEWEB)

    Krementz, Dan; Rose, David; Dunsmuir, Mike

    2014-02-06

    The purpose of this study is to determine whether a commercial dry transfer system (DTS) could be used for loading or unloading used nuclear fuel (UNF) in L-Basin and to determine if a DTS pool adapter could be made for L-Basin Transfer Pit #2 that could accommodate a variety of DTS casks and fuel baskets or canisters up to 24” diameter.[1, 2] This study outlines the technical feasibility of accommodating different vendor dry transfer systems in the L-Basin Transfer Bay with a general work scope. It identifies equipment needing development, facility modifications, and describes the needed analyses and calculations. After reviewing the L-Basin Transfer Bay area layout and information on the only DTS system currently in use for the Nuclear Assurance Corporation Legal Weight Truck cask (NAC LWT), the authors conclude that use of a dry transfer cask is feasible. AREVA was contacted and acknowledged that they currently do not have a design for a dry transfer cask for their new Transnuclear Long Cask (TN-LC) cask. Nonetheless, this study accounted for a potential future DTS from AREVA to handle fuel baskets up to 18” in diameter. Due to the layout of the Transfer Bay, it was determined that a DTS cask pool adapter designed specifically for spanning Pit #2 and placed just north of the 70 Ton Cask lid lifting superstructure would be needed. The proposed pool adapter could be used to transition a fuel basket up to 24” in diameter and ~11 feet long from a dry transfer cask to the basin. The 18” and 24” applications of the pool adapter are pending vendor development of dry transfer casks that accommodate these diameters. Once a fuel basket has been lowered into Pit #2 through a pool adapter, a basket cart could be used to move the basket out from under the pool adapter for access by the 5 Ton Crane. The cost to install a dry transfer cask handling system in L-Area capable of handling multiple vendor provided transport and dry transfer casks and baskets with

  9. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  10. List of Contractors to Support Anthrax Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

  11. Contractor and government - Teamwork and commitment

    Science.gov (United States)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  12. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different from...

  13. CPECC Listed in World's Top International Contractors

    Institute of Scientific and Technical Information of China (English)

    Han Xiaoju; Wang Zhen; Liu Fuxin

    2006-01-01

    @@ With great efforts for many years, China Petroleum Engineering & Construction (Group) Corporation (CPECC) has become an international contractor, mainly engaged in contracting international projects. It has accumulatively fulfilled a contract value of US$2.363billion in Sudan, Pakistan, Kazakhstan, Algeria, Venezuela and Syria and other countries and regions worldwide and has been repeatedly listed amongst the World's Top 225 International Contractors so far.

  14. 48 CFR 1845.607-170 - Contractor's approved scrap procedure.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's approved scrap... Contractor Inventory 1845.607-170 Contractor's approved scrap procedure. (a) When a contractor has an approved scrap procedure, certain property may be routinely disposed of in accordance with that...

  15. Safety evaluation for packaging (onsite) plutonium recycle test reactor graphite cask

    Energy Technology Data Exchange (ETDEWEB)

    Romano, T.

    1997-09-29

    This safety evaluation for packaging (SEP) provides the evaluation necessary to demonstrate that the Plutonium Recycle Test Reactor (PRTR) Graphite Cask meets the requirements of WHC-CM-2-14, Hazardous Material Packaging and Shipping, for transfer of Type B, fissile, non-highway route controlled quantities of radioactive material within the 300 Area of the Hanford Site. The scope of this SEP includes risk, shieldling, criticality, and.tiedown analyses to demonstrate that onsite transportation safety requirements are satisfied. This SEP also establishes operational and maintenance guidelines to ensure that transport of the PRTR Graphite Cask is performed safely in accordance with WHC-CM-2-14. This SEP is valid until October 1, 1999. After this date, an update or upgrade to this document is required.

  16. Nonlinear Ultrasonic Diagnosis and Prognosis of ASR Damage in Dry Cask Storage

    Energy Technology Data Exchange (ETDEWEB)

    Qu, Jianmin [Northwestern Univ., Evanston, IL (United States); Bazant, Zdenek [Northwestern Univ., Evanston, IL (United States); Jacobs, Laurence [Georgia Inst. of Technology, Atlanta, GA (United States); Guimaraes, Maria [Electrical Power Research Institute, Palo Alto, CA (United States)

    2015-11-30

    Alkali-silica reaction (ASR) is a deleterious chemical process that may occur in cement-based materials such as mortars and concretes, where the hydroxyl ions in the highly alkaline pore solution attack the siloxane groups in the siliceous minerals in the aggregates. The reaction produces a cross-linked alkali-silica gel. The ASR gel swells in the presence of water. Expansion of the gel results in cracking when the swelling-induced stress exceeds the fracture toughness of the concrete. As the ASR continues, cracks may grow and eventually coalesce, which results in reduced service life and a decrease safety of concrete structures. Since concrete is widely used as a critical structural component in dry cask storage of used nuclear fuels, ASR damage poses a significant threat to the sustainability of long term dry cask storage systems. Therefore, techniques for effectively detecting, managing and mitigating ASR damage are needed. Currently, there are no nondestructive methods to accurately detect ASR damage in existing concrete structures. The only current way of accurately assessing ASR damage is to drill a core from an existing structure, and conduct microscopy on this drilled cylindrical core. Clearly, such a practice is not applicable to dry cask storage systems. To meet these needs, this research is aimed at developing (1) a suite of nonlinear ultrasonic quantitative nondestructive evaluation (QNDE) techniques to characterize ASR damage, and (2) a physics-based model for ASR damage evolution using the QNDE data. Outcomes of this research will provide a nondestructive diagnostic tool to evaluate the extent of the ASR damage, and a prognostic tool to estimate the future reliability and safety of the concrete structures in dry cask storage systems

  17. Localization of cask and plug remote handling system in ITER using multiple video cameras

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, João, E-mail: jftferreira@ipfn.ist.utl.pt [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Vale, Alberto [Instituto de Plasmas e Fusão Nuclear - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ribeiro, Isabel [Laboratório de Robótica e Sistemas em Engenharia e Ciência - Laboratório Associado, Instituto Superior Técnico, Universidade Técnica de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2013-10-15

    Highlights: ► Localization of cask and plug remote handling system with video cameras and markers. ► Video cameras already installed on the building for remote operators. ► Fiducial markers glued or painted on cask and plug remote handling system. ► Augmented reality contents on the video streaming as an aid for remote operators. ► Integration with other localization systems for enhanced robustness and precision. -- Abstract: The cask and plug remote handling system (CPRHS) provides the means for the remote transfer of in-vessel components and remote handling equipment between the Hot Cell building and the Tokamak building in ITER. Different CPRHS typologies will be autonomously guided following predefined trajectories. Therefore, the localization of any CPRHS in operation must be continuously known in real time to provide the feedback for the control system and also for the human supervision. This paper proposes a localization system that uses the video streaming captured by the multiple cameras already installed in the ITER scenario to estimate with precision the position and the orientation of any CPRHS. In addition, an augmented reality system can be implemented using the same video streaming and the libraries for the localization system. The proposed localization system was tested in a mock-up scenario with a scale 1:25 of the divertor level of Tokamak building.

  18. Thermal analysis of a storage cask for 24 spent PWR fuel assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J.C.; Bang, K.S.; Seo, K.S.; Kim, H.D. [Korea Atomic Energy Research Inst., Daejeon (Korea); Choi, B.I.; Lee, H.Y.; Song, M.J. [Korea Hydro and Nuclear Power Co., Ltd., Daejeon (Korea)

    2004-07-01

    The purpose of this paper is to perform a thermal analysis of a spent fuel storage cask in order to predict the maximum concrete and fuel cladding temperatures. Thermal analyses have been carried out for a storage cask under normal and off-normal conditions. The environmental temperature is assumed to be 27 {open_square} under the normal condition. The off-normal condition has an environmental temperature of 40 {open_square}. An additional off-normal condition is considered as a partial blockage of the air inlet ducts. Four of the eight inlet ducts are assumed to be completely blocked. The storage cask is designed to store 24 PWR spent fuel assemblies with a burn-up of 55,000 MWD/MTU and a cooling time of 7 years. The decay heat load from the 24 PWR assemblies is 25.2 kW. Thermal analyses of ventilation system have been carried out for the determination of the optimum duct size and shape. The finite volume computational fluid dynamics code FLUENT was used for the thermal analysis. In the results of the analysis, the maximum temperatures of the fuel rod and concrete overpack were lower than the allowable values under the normal condition and off-normal conditions.

  19. Advantages of dry hardened cask storage over wet storage for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, Luiz Sergio, E-mail: romanato@ctmsp.mar.mil.b [Centro Tecnologico da Marinha em Sao Paulo (CTMSP), Sao Paulo, SP (Brazil). Dept. da Qualidade

    2011-07-01

    Pools are generally used to store and maintain spent nuclear fuel assemblies for cooling, after removed from reactors. After three to five years stored in the pools, spent fuel can be reprocessed or sent to a final disposition in a geological repository and handled as radioactive waste or sent to another site waiting for future solution. Spent fuel can be stored in dry or wet installations, depending on the method adopted by the nuclear plant. If this storage were exclusively wet, at the installation decommissioning in the future, another solution for storage will need to be found. Today, after a preliminary cooling, the spent fuel assemblies can be removed from the pool and sent to dry hardened storage installations. This kind of storage does not need complex radiation monitoring and it is safer than wet storage. Brazil has two nuclear reactors in operation, a third reactor is under construction and they use wet spent fuel storage . Dry hardened casks use metal or both metal and concrete for radiation shielding and they are safe, especially during an earthquake. An earthquake struck Japan on March 11, 2011 damaging Fukushima Daiichi nuclear power plant. The occurrence of earthquakes in Brazil is very small but dry casks can resist to other events, including terrorist acts, better than pools. This paper shows the advantages of dry hardened cask storage in comparison with the wet storage (water pools) for spent nuclear fuel. (author)

  20. Quivers For Special Fuel Rods-Disposal Of Special Fuel Rods In CASTOR V Casks

    Energy Technology Data Exchange (ETDEWEB)

    Bannani, Amin; Cebula, Wojciech; Buchmuller, Olga; Huggenberg, Roland [GNS, Essen (Germany); Helmut Kuhl [WTI, Julich (Germany)

    2015-05-15

    While GNS casks of the CASTOR family are a suitable means to transfer fuel assemblies (FA) from the NPP to an interim dry storage site, Germanys phase-out of nuclear energy has triggered the demand for an additional solution to dispose of special fuel rods (SFR), normally remaining in the fuel pond until the final shutdown of the NPP. SFR are fuel rods that had to be removed from fuel assemblies mainly due to their special condition, e. g. damages in the cladding of the fuel rods which may have occurred during reactor operations. SFR are usually stored in the spent fuel pond after they are removed from the FA. The quiver for special fuel rods features a robust yet simple design, with a high mechanical stability, a reliable leak-tightness and large safety margins for future requirements on safety analysis. The quiver for special fuel rods can be easily adapted to a large variety of different damaged fuel rods and tailored to the specific need of the customer. The quiver for special fuel rods is adaptable e.g. in length and diameter for use in other types of transport and storage casks and is applicable in other countries as well. The overall concept presented here is a first of its kind solution for the disposal of SFRs via Castor V-casks. This provides an important precondition in achieving the status 'free from nuclear fuel' of the shut down German NPPs.

  1. Probabilistic Risk Assessment of Cask Drop Accident during On-site Spent Nuclear Fuel Transportation

    Energy Technology Data Exchange (ETDEWEB)

    Ham, Jae Hyun; Christian, Robby; Momani, Belal Al; Kang, Hyun Gook [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are two ways to transfer the SNF from a site to other site, one is land transportation and the other is maritime transportation. Maritime transportation might be used because this way uses more safe route which is far from populated area. The whole transportation process can be divided in two parts: transferring the SNF between SNP and wharf in-Nuclear Power Plant (NPP) site by truck, and transferring the SNF from the wharf to the other wharf by ship. In this research, on-site SNF transportation between SNP and wharf was considered. Two kinds of single accident can occur during this type of SNF transportation, impact and fire, caused by internal events and external events. In this research, PRA of cask drop accident during onsite SNF transportation was done, risk to a person (mSv/person) from a case with specific conditions was calculated. In every 11 FEM simulation drop cases, FDR is 1 even the fuel assemblies are located inside of the cask. It is a quite larger value for all cases than the results with similar drop condition from the reports which covers the PRA on cask storage system. Because different from previous reports, subsequent impact was considered. Like in figure 8, accelerations which are used to calculate the FDR has extremely higher values in subsequent impact than the first impact for all SNF assemblies.

  2. Alternative Splicing of a Novel Inducible Exon Diversifies the CASK Guanylate Kinase Domain

    Directory of Open Access Journals (Sweden)

    Jill A. Dembowski

    2012-01-01

    Full Text Available Alternative pre-mRNA splicing has a major impact on cellular functions and development with the potential to fine-tune cellular localization, posttranslational modification, interaction properties, and expression levels of cognate proteins. The plasticity of regulation sets the stage for cells to adjust the relative levels of spliced mRNA isoforms in response to stress or stimulation. As part of an exon profiling analysis of mouse cortical neurons stimulated with high KCl to induce membrane depolarization, we detected a previously unrecognized exon (E24a of the CASK gene, which encodes for a conserved peptide insertion in the guanylate kinase interaction domain. Comparative sequence analysis shows that E24a appeared selectively in mammalian CASK genes as part of a >3,000 base pair intron insertion. We demonstrate that a combination of a naturally defective 5 splice site and negative regulation by several splicing factors, including SC35 (SRSF2 and ASF/SF2 (SRSF1, drives E24a skipping in most cell types. However, this negative regulation is countered with an observed increase in E24a inclusion after neuronal stimulation and NMDA receptor signaling. Taken together, E24a is typically a skipped exon, which awakens during neuronal stimulation with the potential to diversify the protein interaction properties of the CASK polypeptide.

  3. Alternate approaches to verifying the structural adequacy of the Defense High Level Waste Shipping Cask

    Energy Technology Data Exchange (ETDEWEB)

    Zimmer, A.; Koploy, M.

    1991-12-01

    In the early 1980s, the US Department of Energy/Defense Programs (DOE/DP) initiated a project to develop a safe and efficient transportation system for defense high level waste (DHLW). A long-standing objective of the DHLW transportation project is to develop a truck cask that represents the leading edge of cask technology as well as one that fully complies with all applicable DOE, Nuclear Regulatory Commission (NRC), and Department of Transportation (DOT) regulations. General Atomics (GA) designed the DHLW Truck Shipping Cask using state-of-the-art analytical techniques verified by model testing performed by Sandia National Laboratories (SNL). The analytical techniques include two approaches, inelastic analysis and elastic analysis. This topical report presents the results of the two analytical approaches and the model testing results. The purpose of this work is to show that there are two viable analytical alternatives to verify the structural adequacy of a Type B package and to obtain an NRC license. It addition, this data will help to support the future acceptance by the NRC of inelastic analysis as a tool in packaging design and licensing.

  4. A comparison of spent fuel shipping cask response to 10 CFR 71 normal conditions and realistic hot day extremes

    Energy Technology Data Exchange (ETDEWEB)

    Manson, S.J.; Gianoulakis, S.E. [Sandia National Labs., Albuquerque, NM (United States). Transportation Systems Development Dept.

    1994-04-01

    An examination of the effect of a realistic (though conservative) hot day environment on the thermal transient behavior of spent fuel shipping casks is made. These results are compared to those that develop under the prescribed normal thermal condition of 10 CFR 71. Of specific concern are the characteristics of propagating thermal waves, which are set up by diurnal variations of temperature and insolation in the outdoor environment. In order to arrive at a realistic approximation of these variations on a conservative hot day, actual temperature and insolation measurements have been obtained from the National Climatic Data Center (NCDC) for representatively hot and high heat flux days. Thus, the use of authentic meteorological data ensures the realistic approach sought. Further supporting the desired realism of the modeling effort is the use of realistic cask configurations in which multiple laminations of structural, shielding, and other materials are expected to attenuate the propagating thermal waves. The completed analysis revealed that the majority of wall temperatures, for a wide variety of spent fuel shipping cask configurations, fall well below those predicted by enforcement of the regulatory environmental conditions of 10 CFR 71. It was found that maximum temperatures at the cask surface occasionally lie above temperatures predicted under the prescribed regulatory conditions. However, the temperature differences are small enough that the normal conservative assumptions that are made in the course of typical cask evaluations should correct for any potential violations. The analysis demonstrates that diurnal temperature variations that penetrate the cask wall all have maxima substantially less than the corresponding regulatory solutions. Therefore it is certain that vital cask components and the spent fuel itself will not exceed the temperatures calculated by use of the conditions of 10 CFR 71.

  5. Dynamic Response Analysis of Storage Cask Lid Structure Subjected to Lateral Impact Load of Aircraft Engine Crash

    Energy Technology Data Exchange (ETDEWEB)

    Almomania, Belal; Kang, Hyun Gook [KAIST, Daejeon (Korea, Republic of); Lee, Sanghoon [Keimyung Univ., Daegu (Korea, Republic of)

    2015-10-15

    Several numerical methods and tests have been carried out to measure the capability of storage cask to withstand extreme impact loads. Testing methods are often constrained by cost, and difficulty in preparation for several impact conditions with different applied loads, and areas of impact. Instead, analytic method is an acceptable process that can easily apply different impact conditions for the evaluation of cask integrity. The aircraft engine impact is considered as one of the most critical impact accidents on the storage cask that significantly affects onto the lid closure system and may cause a considerable release of radioactive materials. This paper presents a method for evaluating the dynamic responses of one upper metal cask lid closure without impact limiters subjected to lateral impact of an aircraft engine with respect to variation of the impact velocity. An assessment method to predict damage response due to the lateral engine impact onto metal storage cask has been studied by using computer code LS-DYNA. The dynamic behavior of the lid movements was successfully calculated by utilizing a simplified finite element cask model, which showed a good agreement with the previous research. The simulation analyses results showed that no significant plastic deformation for bolts, lid, and the cask body. In this study, the lid opening and sliding displacements are considered as the major factors in initiating the leakage path. This analysis may be useful for evaluating the instantaneous leakage rates in a connection with the sliding and opening displacements between the lid and the flange to ensure that the radiological consequences caused by an aircraft engine crash accident during the storage phase are within the permissible level.

  6. Discussion of Available Methods to Support Reviews of Spent Fuel Storage Installation Cask Drop Evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Witte, M.

    2000-03-28

    Applicants seeking a Certificate of Compliance for an Independent Spent Fuel Storage Installation (ISFSI) cask must evaluate the consequences of a handling accident resulting in a drop or tip-over of the cask onto a concrete storage pad. As a result, analytical modeling approaches that might be used to evaluate the impact of cylindrical containers onto concrete pads are needed. One such approach, described and benchmarked in NUREG/CR-6608,{sup 1} consists of a dynamic finite element analysis using a concrete material model available in DYNA3D{sup 2} and in LS-DYNA,{sup 3} together with a method for post-processing the analysis results to calculate the deceleration of a solid steel billet when subjected to a drop or tip-over onto a concrete storage pad. The analysis approach described in NUREG/CR-6608 gives a good correlation of analysis and test results. The material model used for the concrete in the analyses in NUREG/CR-6608 is, however, somewhat troublesome to use, requiring a number of material constants which are difficult to obtain. Because of this a simpler approach, which adequately evaluates the impact of cylindrical containers onto concrete pads, is sought. Since finite element modeling of metals, and in particular carbon and stainless steel, is routinely and accurately accomplished with a number of finite element codes, the current task involves a literature search for and a discussion of available concrete models used in finite element codes. The goal is to find a balance between a concrete material model with a limited number of required material parameters which are readily obtainable, and a more complex model which is capable of accurately representing the complex behavior of the concrete storage pad under impact conditions. The purpose of this effort is to find the simplest possible way to analytically represent the storage cask deceleration during a cask tip-over or a cask drop onto a concrete storage pad. This report is divided into three sections

  7. Behaviour of neutron moderator materials at high temperatures in CASTOR {sup registered} -casks: qualification and assessment

    Energy Technology Data Exchange (ETDEWEB)

    Krietsch, T.; Wolff, D. [Federal Inst. for Materials Research and Testing (BAM), Berlin (Germany); Knopp, U. [Gesellschaft fuer Nuklear-Behaelter mbH (GNB), Essen (Germany); Brocke, H.D. [TUeV Rheinland Group, Berlin (Germany)

    2004-07-01

    The Federal Institute for Materials Research and Testing (BAM) is the responsible German authority for the assessment of mechanical and thermal designs of transport and storage casks for radioactive materials. BAM checks up the proofs of the applicants in their safety reports and assesses the conformity to the Regulations for the Safe Transport of Radioactive Material. One applicant is the Gesellschaft fuer Nuklear-Behaelter mbH (GNB) with a new generation of transport and storage casks of CASTOR {sup registered} -design. GNB typically uses ultra high molecular weight Polyethylene (UHMW-PE) for the moderation of free neutrons. Rods made of UHMW-PE are positioned in axial bore holes in the wall of the cask and plates of UHMW-PE are in free spaces between primary and secondary lid and between the bottom of the cask and an outer plate (Figure 1). Because of the heat generated by the radioactive inventory and because of a strained spring at the bottom of every bore hole, UHMW-PE is subjected to permanent thermal and mechanical loads as well as loads from gamma and neutron radiation. UHMW-PE has been used under routine- and normal conditions of transport for maximum temperatures up to 130 C. For new generations of CASTOR registered -design maximum temperatures will be increased up to 160 C. That means a permanent use of UHMW-PE at temperatures within and above the melting region of the crystallites. In this paper, some results of special investigations for the proofs of usability of UHMW-PE at temperatures up to 160 C under real conditions of transport and storage in CASTOR registered -casks are given. For that, investigations on temperature dependent expansion behaviour under laboratory conditions as well as in large scale experiments, especially in the case of multiple heating and cooling, were done. Besides, geometrical creep strength for long-term loading by temperatures and pressures with regard to the chemical and physical stability properties of UHMW-PE above the

  8. CASK interacts with PMCA4b and JAM-A on the mouse sperm flagellum to regulate Ca2+ homeostasis and motility.

    Science.gov (United States)

    Aravindan, Rolands G; Fomin, Victor P; Naik, Ulhas P; Modelski, Mark J; Naik, Meghna U; Galileo, Deni S; Duncan, Randall L; Martin-Deleon, Patricia A

    2012-08-01

    Deletion of the highly conserved gene for the major Ca(2+) efflux pump, Plasma membrane calcium/calmodulin-dependent ATPase 4b (Pmca4b), in the mouse leads to loss of progressive and hyperactivated sperm motility and infertility. Here we first demonstrate that compared to wild-type (WT), Junctional adhesion molecule-A (Jam-A) null sperm, previously shown to have motility defects and an abnormal mitochondrial phenotype reminiscent of that seen in Pmca4b nulls, exhibit reduced (P JAM-A on the proximal principal piece, acts as a common interacting partner of both. Importantly, CASK binds alternatively and non-synergistically with each of these molecules via its single PDZ (PDS-95/Dlg/ZO-1) domain to either inhibit or promote efflux. In the absence of CASK-JAM-A interaction in Jam-A null sperm, CASK-PMCA4b interaction is increased, resulting in inhibition of PMCA4b's enzymatic activity, consequent Ca(2+) accumulation, and a ∼6-fold over-expression of constitutively ATP-utilizing CASK, compared to WT. Thus, CASK negatively regulates PMCA4b by directly binding to it and JAM-A positively regulates it indirectly through CASK. The decreased motility is likely due to the collateral net deficit in ATP observed in nulls. Our data indicate that Ca(2+) homeostasis in sperm is maintained by the relative ratios of CASK-PMCA4b and CASK-JAM-A interactions.

  9. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    Science.gov (United States)

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2016-09-06

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior.

  10. Interaction of cosmic ray muons with spent nuclear fuel dry casks and determination of lower detection limit

    Science.gov (United States)

    Chatzidakis, S.; Choi, C. K.; Tsoukalas, L. H.

    2016-08-01

    The potential non-proliferation monitoring of spent nuclear fuel sealed in dry casks interacting continuously with the naturally generated cosmic ray muons is investigated. Treatments on the muon RMS scattering angle by Moliere, Rossi-Greisen, Highland and, Lynch-Dahl were analyzed and compared with simplified Monte Carlo simulations. The Lynch-Dahl expression has the lowest error and appears to be appropriate when performing conceptual calculations for high-Z, thick targets such as dry casks. The GEANT4 Monte Carlo code was used to simulate dry casks with various fuel loadings and scattering variance estimates for each case were obtained. The scattering variance estimation was shown to be unbiased and using Chebyshev's inequality, it was found that 106 muons will provide estimates of the scattering variances that are within 1% of the true value at a 99% confidence level. These estimates were used as reference values to calculate scattering distributions and evaluate the asymptotic behavior for small variations on fuel loading. It is shown that the scattering distributions between a fully loaded dry cask and one with a fuel assembly missing initially overlap significantly but their distance eventually increases with increasing number of muons. One missing fuel assembly can be distinguished from a fully loaded cask with a small overlapping between the distributions which is the case of 100,000 muons. This indicates that the removal of a standard fuel assembly can be identified using muons providing that enough muons are collected. A Bayesian algorithm was developed to classify dry casks and provide a decision rule that minimizes the risk of making an incorrect decision. The algorithm performance was evaluated and the lower detection limit was determined.

  11. Identification and glycerol-induced correction of misfolding mutations in the X-linked mental retardation gene CASK.

    Directory of Open Access Journals (Sweden)

    Leslie E W LaConte

    Full Text Available The overwhelming amount of available genomic sequence variation information demands a streamlined approach to examine known pathogenic mutations of any given protein. Here we seek to outline a strategy to easily classify pathogenic missense mutations that cause protein misfolding and are thus good candidates for chaperone-based therapeutic strategies, using previously identified mutations in the gene CASK. We applied a battery of bioinformatics algorithms designed to predict potential impact on protein structure to five pathogenic missense mutations in the protein CASK that have been shown to underlie pathologies ranging from X-linked mental retardation to autism spectrum disorder. A successful classification of the mutations as damaging was not consistently achieved despite the known pathogenicity. In addition to the bioinformatics analyses, we performed molecular modeling and phylogenetic comparisons. Finally, we developed a simple high-throughput imaging assay to measure the misfolding propensity of the CASK mutants in situ. Our data suggests that a phylogenetic analysis may be a robust method for predicting structurally damaging mutations in CASK. Mutations in two evolutionarily invariant residues (Y728C and W919R exhibited a strong propensity to misfold and form visible aggregates in the cytosolic milieu. The remaining mutations (R28L, Y268H, and P396S showed no evidence of aggregation and maintained their interactions with known CASK binding partners liprin-α3 Mint-1, and Veli, indicating an intact structure. Intriguingly, the protein aggregation caused by the Y728C and W919R mutations was reversed by treating the cells with a chemical chaperone (glycerol, providing a possible therapeutic strategy for treating structural mutations in CASK in the future.

  12. Safety aspects of long-term dry interim storage of type-B spent fuel and HLW transport casks

    Energy Technology Data Exchange (ETDEWEB)

    Wolff, D.; Probst, U.; Voelzke, H.; Droste, B.; Roedel, R. [Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin (Germany)

    2004-07-01

    Based on the German decision to minimise transports of spent fuel casks between nuclear power plants, reprocessing plants and central storage facilities several on-site storage facilities have been licensed till the end of 2003. Because of the large amount of type-B transport casks which are going to be used for long-term interim storage the question of time limited type-B license maintenance during the storage period of up to 40 years has been discussed under different aspects. This paper describes present technical aspects of the discussion. A main aspect of transport cask qualification for interim storage is the long-term behaviour of the metallic seal lid system. Concerning this results from current experimental long-term tests with metallic ''Helicoflex''-seals in which pool water is enclosed are presented. The test series has been performed by the Federal Institute for Materials Research and Testing (BAM) on behalf of the Federal Office for Radiation Protection (BfS) since 2001. Finally, the paper presents a German concept for an authorities' and technical experts' exchange of experience, know-how and state of the art referring to cask dispatch in nuclear facilities. BAM has taken over a central role in this so-called ''co-ordinating institution for cask dispatching information'' (''KOBAF'') which contains an online data base and a technical working group meeting twice a year. The goal is to keep comparable technical standards for all nuclear sites and storage facilities which are going to load and dispatch casks of the same or similar types under the responsibility of different German state governments for the next decades.

  13. A novel interaction between FRMD7 and CASK: evidence for a causal role in idiopathic infantile nystagmus.

    Science.gov (United States)

    Watkins, Rachel J; Patil, Rajashree; Goult, Benjamin T; Thomas, Mervyn G; Gottlob, Irene; Shackleton, Sue

    2013-05-15

    Idiopathic infantile nystagmus (IIN) is a genetically heterogeneous disorder of eye movement that can be caused by mutations in the FRMD7 gene that encodes a FERM domain protein. FRMD7 is expressed in the brain and knock-down studies suggest it plays a role in neurite extension through modulation of the actin cytoskeleton, yet little is known about its precise molecular function and the effects of IIN mutations. Here, we studied four IIN-associated missense mutants and found them to have diverse effects on FRMD7 expression and cytoplasmic localization. The C271Y mutant accumulates in the nucleus, possibly due to disruption of a nuclear export sequence located downstream of the FERM-adjacent domain. While overexpression of wild-type FRMD7 promotes neurite outgrowth, mutants reduce this effect to differing degrees and the nuclear localizing C271Y mutant acts in a dominant-negative manner to inhibit neurite formation. To gain insight into FRMD7 molecular function, we used an IP-MS approach and identified the multi-domain plasma membrane scaffolding protein, CASK, as a FRMD7 interactor. Importantly, CASK promotes FRMD7 co-localization at the plasma membrane, where it enhances CASK-induced neurite length, whereas IIN-associated FRMD7 mutations impair all of these features. Mutations in CASK cause X-linked mental retardation. Patients with C-terminal CASK mutations also present with nystagmus and, strikingly, we show that these mutations specifically disrupt interaction with FRMD7. Together, our data strongly support a model whereby CASK recruits FRMD7 to the plasma membrane to promote neurite outgrowth during development of the oculomotor neural network and that defects in this interaction result in nystagmus.

  14. 18 CFR 3b.4 - Government contractors.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Government contractors. 3b.4 Section 3b.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES COLLECTION, MAINTENANCE, USE, AND DISSEMINATION OF RECORDS OF...

  15. 78 FR 11164 - Policy on Contractor Profits

    Science.gov (United States)

    2013-02-15

    ... Defense Acquisition Regulations System Policy on Contractor Profits AGENCY: Defense Acquisition..., at 703- 693-1145. Please cite NDAA FY 2013 Profit Policy Public Meeting. SUPPLEMENTARY INFORMATION: DoD is interested in opening a dialogue with experts and interested parties in Government and...

  16. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory....

  17. 48 CFR 2132.170 - Recurring premium payments to Contractors.

    Science.gov (United States)

    2010-10-01

    ..., a reconciliation of premiums, benefits, and other costs will be performed as a limited cost... Contractor's bank for payment. (c) Nothing in this chapter will affect the ability of the Contractor to...

  18. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  19. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available practices and thereby grow and prosper. Furthermore, the authors argue that improvement, adequate resourcing and the implementation of models and programmes that embrace effective contractor development can greatly enhance the management capabilities...

  20. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  1. Criticality Analysis of Assembly Misload in a PWR Burnup Credit Cask

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, J. C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2008-01-31

    The Interim Staff Guidance on bumup credit (ISG-8) for spent fuel in storage and transportation casks, issued by the Nuclear Regulatory Commission's Spent Fuel Project Office, recommends a bumup measurement for each assembly to confirm the reactor record and compliance with the assembly bumup value used for loading acceptance. This recommendation is intended to prevent unauthorized loading (misloading) of assemblies due to inaccuracies in reactor burnup records and/or improper assembly identification, thereby ensuring that the appropriate subcritical margin is maintained. This report presents a computational criticality safety analysis of the consequences of misloading fuel assemblies in a highcapacity cask that relies on burnup credit for criticality safety. The purpose of this report is to provide a quantitative understanding of the effects of fuel misloading events on safety margins. A wide variety of fuel-misloading configurations are investigated and results are provided for informational purposes. This report does not address the likelihood of occurrence for any of the misload configurations considered. For representative, qualified bumup-enrichment combinations, with and without fission products included, misloading two assemblies that are underburned by 75% results in an increase in keff of 0.025-0.045, while misloading four assemblies that are underburned by 50% also results in an increase in keff of 0.025-0.045. For the cask and conditions considered, a reduction in bumup of 20% in all assemblies results in an increase in kff of less than 0.035. Misloading a single fresh assembly with 3, 4, or 5 wt% 235U enrichment results in an increase in keffof--0.02, 0.04, or 0.06, respectively. The report concludes with a summary of these and other important findings, as well as a discussion of relevant issues that should be considered when assessing the appropriate role of burnup measurements.

  2. Recommendations on Fuel Parameters for Standard Technical Specifications for Spent Fuel Storage Casks

    Energy Technology Data Exchange (ETDEWEB)

    Bowman, S.M.

    2001-03-08

    The U.S. Nuclear Regulatory Commission (NRC) is currently reviewing the technical specifications for spent fuel storage casks in an effort to develop standard technical specifications (STS) that define the allowable spent nuclear fuel (SNF) contents. One of the objectives of the review is to minimize the level of detail in the STS that define the acceptable fuel types. To support this initiative, this study has been performed to identify potential fuel specification parameters needed for criticality safety and radiation shielding analysis and rank their importance relative to a potential compromise of the margin of safety.

  3. 48 CFR 245.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory....

  4. Development and validation of a strategic repositioning model for defense and aerospace contractors

    Science.gov (United States)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  5. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Science.gov (United States)

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  6. Literature Survey of Copper Corrosion Modelling under Deep Geological Disposal Environment

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heui-Joo; Kook, Dong-Hak; Lee, Min-Soo; Choi, Heui-Joo

    2008-03-15

    As a one of the solution for the spent nuclear fuel problem, deep repository research have been under way in KAERI. To raise the resistance against repository cask corrosion, copper canister was adopted for the outer material of the cask. Duration of the repository with million year order makes the copper corrosion research under the repository environment very important and the corrosion modelling which could trace the real world precisely and predict the corrosion behavior very well is subsequently necessary. With in progress of plan to manufacture unique copper cask corresponding to our country repository system, survey for the preceding research papers in recent research direction and kernel points is expected to significant. This paper arranged the representative literatures for the important corrosion mechanism which are recently published.

  7. IMPACT ANALYSES AND TESTS OF CONCRETE OVERPACKS OF SPENT NUCLEAR FUEL STORAGE CASKS

    Directory of Open Access Journals (Sweden)

    SANGHOON LEE

    2014-02-01

    Full Text Available A concrete cask is an option for spent nuclear fuel interim storage. A concrete cask usually consists of a metallic canister which confines the spent nuclear fuel assemblies and a concrete overpack. When the overpack undergoes a missile impact, which might be caused by a tornado or an aircraft crash, it should sustain an acceptable level of structural integrity so that its radiation shielding capability and the retrievability of the canister are maintained. A missile impact against a concrete overpack produces two damage modes, local damage and global damage. In conventional approaches [1], those two damage modes are decoupled and evaluated separately. The local damage of concrete is usually evaluated by empirical formulas, while the global damage is evaluated by finite element analysis. However, this decoupled approach may lead to a very conservative estimation of both damages. In this research, finite element analysis with material failure models and element erosion is applied to the evaluation of local and global damage of concrete overpacks under high speed missile impacts. Two types of concrete overpacks with different configurations are considered. The numerical simulation results are compared with test results, and it is shown that the finite element analysis predicts both local and global damage qualitatively well, but the quantitative accuracy of the results are highly dependent on the fine-tuning of material and failure parameters.

  8. IMPACLIB: a material property data library for impact analysis of radioactive material transport casks

    Energy Technology Data Exchange (ETDEWEB)

    Ikushima, Takeshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1997-12-01

    The paper describes the structural data library and graphical program for impact and stress analyses of radioactive material transport casks. Four kinds of material data, structure steels, stainless steels, leads and woods are compiled. These materials are main structural elements of casks. Structural data such as, coefficient of thermal expansion, modulus of longitudinal elasticity, modulus of transverse elasticity, Poisson`s ratio and stress-strain relationship have been tabulated. Main features of IMPACLIB are as follows: (1) data have been tabulated against temperature or strain rate, (2) thirteen kinds of polynominal fitting for stress-strain curve are available, (3) it is capable of graphical representations for structural data and (4) the IMPACLIB is able to be used on not only main frame computers but also work stations (OS UNIX) and personal computers (OS Windows 3.1). In the paper, brief illustration of data library is presented in the first section. The second section presents descriptions of structural data. The third section provides a user`s guide for computer program and input data for the IMPACLIB. (author)

  9. Preliminary design report: Babcock and Wilcox BR-100 100-ton rail/barge spent fuel shipping cask

    Energy Technology Data Exchange (ETDEWEB)

    None

    1990-02-01

    The purpose of this document is to provide information on burnup credit as applied to the preliminary design of the BR-100 shipping cask. There is a brief description of the preliminary basket design and the features used to maintain a critically safe system. Following the basket description is a discussion of various criticality analyses used to evaluate burnup credit. The results from these analyses are then reviewed in the perspective of fuel burnups expected to be shipped to either the final repository or a Monitored Retrievable Storage (MRS) facility. The hurdles to employing burnup credit in the certification of any cask are then outlines and reviewed. the last section gives conclusions reached as to burnup credit for the BR-100 cask, based on our analyses and experience. All information in this study refers to the cask configured to transport PWR fuel. Boiling Water Reactor (BWR) fuel satisfies the criticality requirements so that burnup credit is not needed. All calculations generated in the preparation of this report were based upon the preliminary design which will be optimized during the final design. 8 refs., 19 figs., 16 tabs.

  10. 78 FR 67348 - Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research...

    Science.gov (United States)

    2013-11-12

    ...: U.S. Department of Energy, C/O Melissa Bates, 1955 Freemont Ave., MS 1235, Idaho Falls, ID 83415..., 1955 Fremont Ave., Attn: Melissa Bates, Idaho Falls, ID, between 8 a.m. and 3:30 p.m. MT, Monday.... Melissa Bates, Contracting Officers Representative, High Burnup Dry Storage Cask Research and...

  11. Experience with the transport and storage casks CASTOR (registered) MTR 2 for spent nuclear fuel assemblies from research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Jack, Allen; Rettenbacher, Katharina; Skrzyppek, Juergen [GNS Gesellschaft fuer Nuklear-Service mbH, Essen (Germany)

    2011-07-01

    The CASTOR (registered) MTR 2 cask was designed and manufactured by the company GNS during the 1990's for the transport and interim storage of spent nuclear fuel assemblies from various types of research reactors. Casks of this type have been used at the VKTA Research Centre in Rossendorf near Dresden, Germany as well as at the European Commission's Joint Research Centre at Petten and at the HOR reactor at Delft in the Netherlands. A total of 24 units have been used for the functions of transport and storage with various spent fuel types (VVER, HFR-HEU, and HOR-HEU) for more than ten years now. This type of packaging for radioactive material is a member of the CASTOR (registered) family of spent nuclear fuel casks used worldwide. Over 1000 units are loaded and in storage in Europe, Asia, Africa and North America. This paper presents the experience from the use of the casks for transport and storage in the past, as well as the prospects for the future. (author)

  12. Safety evaluation for packaging for the transport of K Basin sludge samples in the PAS-1 cask

    Energy Technology Data Exchange (ETDEWEB)

    SMITH, R.J.

    1998-11-17

    This safety evaluation for packaging authorizes the shipment of up to two 4-L sludge samples to and from the 325 Lab or 222-S Lab for characterization. The safety of this shipment is based on the current U.S. Department of Energy Certification of Compliance (CoC) for the PAS-1 cask, USA/9184/B(U) (DOE).

  13. Needs of Non Energy-Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  14. Needs of Non-Energy Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liakus, C. [Building Media and the Building America Retrofit Alliance (BARA), Wilmington, DE (United States)

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  15. Government - Prime Contractor - Subcontractor Relationships: An Analysis.

    Science.gov (United States)

    1979-12-01

    regarding DOD contract language , methods of - W ,i contracting and types of fixed and flexible contract instru- ments. In addition, it is further...clauses when passing them along to sub- contractors due to nebulous language , meaning, or misinter- pretation since the terms and conditions would be...Department of Defense, DOD Directive 5000.1, "Major Systems Acqusition ," 18 January 1977. 12. Federal Contracts Reporter, "Subcontracts: DOD Sees Need for

  16. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  17. A feasibility study for using agile contractors to promote mass housing contractors

    Directory of Open Access Journals (Sweden)

    Faraz Pouyandeh

    2015-06-01

    Full Text Available During the past few years, there have been growing changes on managing different projects using the idea of agile manufacturing by moving from the idea of plan to planning. This paper presents an empirical investigation to study whether it is possible to apply the idea of agile in mass construction projects in Iran. The study designs a questionnaire in Likert scale and distributes it among 35 well-known contractors in the field of construction projects. The questionnaire consists of 8 questions, which is considered in terms of four perspectives including culture, projects, tools and processes and employee. Using some statistical test, the study has determined that it would be possible to apply the idea of agile contractors to promote mass housing contractors.

  18. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  19. The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia

    Directory of Open Access Journals (Sweden)

    Salihudin Hassim

    2009-01-01

    Full Text Available The use of IBS (Industrialised Building System has attracted a lot of countries like Singapore, Sweden, Germany, Japan and the United Kingdom. This system can replace the conventional building system which is labour oriented. However, since the first project of IBS in year 1964 till today, IBS in Malaysia is not well accepted by the construction parties because of failure to adequately deal with risks in the IBS projects. To address this matter, this study had identified the risks faced by contractor in IBS construction projects. The risk identification techniques used were brainstorming, analysis of journal and conference papers and discussion with practitioners and data were collected by a questionnaire survey on contractors. It was found that there are twelve major risks in construction using IBS which are; acts of God, change in work and defective design, changes in government regulation, contractor competence, delayed payment and resolving contractual issues, financial failure-any party, labour and equipment productivity, labour, equipment and material availability, quality of work, safety, site access/right of way and suppliers/manufacturers poor performance. Therefore, it is hoped that the finding of this research could assist Malaysian contractors in making risk management planning besides improving decisions making to achieve project.

  20. Shielding calculations with SCALE/MAVRIC and comparison with measurements for the TN85 cask with vitrified high level radioactive waste

    Science.gov (United States)

    Thiele, Holger; Börst, Frank-Michael

    2017-09-01

    A series of dose rate/spectra measurements in the German interim storage facility Gorleben was carried out at a TN85 cask in April 2009. This type of cask is used for the transport and interim storage of vitrified high level radioactive waste (HAW) from reprocessing. The aim of this work is to assess the shielding component MAVRIC of the SCALE code system with these measurements for the use in the German Bundesamt für Kerntechnische Entsorgungssicherheit (BfE).

  1. Inspection and Gamma-Ray Dose Rate Measurements of the Annulus of the VSC-17 Concrete Spent Nuclear Fuel Storage Cask

    Energy Technology Data Exchange (ETDEWEB)

    P. L. Winston

    2007-09-01

    The air cooling annulus of the Ventilated Storage Cask (VSC)-17 spent fuel storage cask was inspected using a Toshiba 7 mm (1/4”) CCD video camera. The dose rates observed in the annular space were measured to provide a reference for the activity to which the camera(s) being tested were being exposed. No gross degradation, pitting, or general corrosion was observed.

  2. Effect of a dual-purpose cask payload increment of spent fuel assemblies from VVER 1000 Bushehr Nuclear Power Plant on basket criticality.

    Science.gov (United States)

    Rezaeian, M; Kamali, J

    2017-01-01

    Dual-purpose casks can be utilized for dry interim storage and transportation of the highly radioactive spent fuel assemblies (SFAs) of Bushehr Nuclear Power Plant (NPP). Criticality safety analysis was carried out using the MCNP code for the cask containing 12, 18, or 19 SFAs. The basket materials of borated stainless steel and Boral (Al-B4C) were investigated, and the minimum required receptacle pitch of the basket was determined. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. SURVEY

    DEFF Research Database (Denmark)

    SURVEY er en udbredt metode og benyttes inden for bl.a. samfundsvidenskab, humaniora, psykologi og sundhedsforskning. Også uden for forskningsverdenen er der mange organisationer som f.eks. konsulentfirmaer og offentlige institutioner samt marketingsafdelinger i private virksomheder, der arbejder...... med surveys. Denne bog gennemgår alle surveyarbejdets faser og giver en praktisk indføring i: • design af undersøgelsen og udvælgelse af stikprøver, • formulering af spørgeskemaer samt indsamling og kodning af data, • metoder til at analysere resultaterne...

  4. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  5. Full-scale prototyping of the Hitachi dual-purpose metal cask and verification of its heat transfer characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Kumagai, N.; Ishida, N.; Ootsuka, M.; Kamoshida, M.; Hiranuma, T.; Doumori, S.; Hoshikawa, T.; Shimizu, M.; Kashiwakura, J.; Hayashi, M. [Hitachi, Ltd., Hitachi (Japan)

    2004-07-01

    Hitachi has been developing dual-purpose metal casks for transport and storage of spent nuclear fuels. The Hitachi cask, HDP69B can store 69 BWR fuel assemblies. The cask features are as follows. 1) The fuel basket is assembled mainly with plates of borated stainless steel. The plates are not welded, but cross-inserted into each other like the dividers in an egg carton. Since the borated stainless steel has relatively low heat conductivity, aluminum alloy plates are inserted along with some stainless steel plates to enhance heat removal ability. 2) Cured resin blocks are fitted into the inner shell of the cask for neutron shielding of the cask body. The resin blocks are surrounded by an aluminum casing which transfers heat of stored fuel from the inner shell to the outer shell of the cask. The block type shield structure eliminates the need for welding the heat transfer fins to the inner and outer shells. The weldless structures of the HDP69B lead to its enhanced manufacturability, but they complicate the heat transfer characteristics because there are gaps between such components as the aluminum casing and inner/outer shells. We carried out full-scale prototyping of the HDP69B and ran a heat transfer test using the prototype. The purposes of the heat transfer test were to check the heat removal ability of the HDP69B and to verify the safety analysis model for heat removal. Results of the heat transfer test and optimized analysis model for heat transfer characteristics of the HDP69B are the focus of this paper. The heat transfer test is summarized as follows. Sixty nine heaters simulating the shape and heat power of spent fuel assemblies were inserted into the fuel basket. After replacing the inner atmosphere with 0.1 MPa of helium, the heat transfer test was started. About 7 days were required to equilibrate the temperature distribution. The temperature at the center of the basket was 194 C. The results confirmed the HDP69B had sufficient heat removal ability. The

  6. The contractor`s role in low-level waste disposal facility application review and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Serie, P.J.; Dressen, A.L. [Environmental Issues Management, Inc., Seattle, WA (United States)

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department in a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.

  7. LOAD-CHECK, program supported optimization of the fuel element disposal in cask CASTOR {sup registered} V casks; LOAD-CHECK, programmunterstuetzte Optimierung der Brennelemententsorgung in CASTOR {sup registered} V-Behaeltern

    Energy Technology Data Exchange (ETDEWEB)

    Amian, D.; Braun, A. [WTI Wissenschaftlich-Technische Ingenieurberatung GmbH, Juelich (Germany); Graf, R.; Hoffmann, V. [GNS Gesellschaft fuer Nuklear-Service mbH, Essen (Germany)

    2010-05-15

    LOAD-CHECK is an interactive program module for the systematic and strategic spent fuel disposal planning. Using physical fuel element data the loading scenarios for the routine operation and the post-closure operation phase can be simulated for free selectable time periods. The basis for the loading license application are the available spent fuel casks according to the regulations of the interim storage facility. LOAD-CHECK allows the optimization of the loading campaigns with respect to the time schedule and the number of casks including the planning of optimized disposal of special spent fuel (MOX fuel elements or high-burnup fuel elements). Possibilities for a reduced post-closure operating phase of nuclear power plants might be the consequence.

  8. TECHNICAL AND ECONOMICAL ANALYSIS OF LOGGING CONTRACTORS

    Directory of Open Access Journals (Sweden)

    Abilio Donizetti de Morais Filho

    2009-09-01

    Full Text Available The objective of this study was to describe the financial conditions of forestry contractors, concerning life quality aspects, condition of work and equipments, operational costs, and economic credit to invest in new technologies. Five companies had been analyzed, with an annual income between US$ 400,000.00 and US$ 1,720,000.00, with an average of US$ 950,000.00. The number of employees varied between 33 and 181, and the companies were classified in terms of size as: one small, two average, and two big. The main difficulties to invest in new machines were high financial taxes, more than 12% an year, and a lack of long term contracts to guarantee the payment capability. It was observed that the contractors did not consider the capital remuneration and a correct depreciation of machines, resulting in an average machine life higher than 10 years. The final conclusions were that the costs were above the paid values for the services, when computed the depreciation and capital remuneration, with negative results in the financial analyzes of three companies. Finally, the mechanization process increased the workers life quality, however, the annual income was around US$ 2,112.00 per worker, approximately 39% lower than the average Brazilian population.

  9. Experimental assessment on the thermal effects of the neutron shielding and heat-transfer fin of dual purpose casks on open pool fire

    Energy Technology Data Exchange (ETDEWEB)

    Bang, Kyoung-Sik, E-mail: nksbang@kaeri.re.kr; Yu, Seung-Hwan; Lee, Ju-Chan; Seo, Ki-Seog; Choi, Woo-Seok

    2016-08-01

    Highlights: • An open pool fire test was performed to estimate not only the combustion effect of the neutron shielding but also the effect of the heat transfer fin of the dual purpose cask. • The heat transfer to the inside of the dual purpose cask was reduced, when the neutron shielding burns. • The surface temperatures are lower in the present of the heat transfer fins. • If inflammable material is used as the components of the cask, evaluating thermal integrity using the thermal test would be desirable. - Abstract: Dual purpose casks are used for storage and transport of spent nuclear fuel assemblies. They must therefore satisfy the requirements prescribed in the Korea Nuclear Safety Security Commission Act 2014-50, the IAEA Safety Standard Series No. SSR-6, and US 10 CFR Part 71. These regulatory guidelines classify the dual purpose cask as a Type B package and state that a Type B package must be able to withstand a temperature of 800 °C for a period of 30 min. NS-4-FR is used as neutron shielding of the dual purpose cask. Heat transfer fins are embedded to enhance heat transfer from the cask body to the outer-shell because the thermal conductivity of NS-4-FR is not good. However, accurately simulating not only the combustion effect of the neutron shielding but also the effect of the heat transfer fin in the thermal analysis is not easy. Therefore, an open pool fire test was conducted using a one-sixth slice of a real cask to estimate these effects at a temperature of 800 °C for a period of 30 min. The temperature at the central portion of the neutron shielding was lower when the neutron shielding in contact with the outer cask burned because the neutron shielding absorbed the surrounding latent heat as the neutron shielding burned. Therefore, the heat transfer to the inside of the dual purpose cask was reduced. The surface temperature was lower when a heat transfer fin was installed because the high heat generated by the flame was transferred to the

  10. Factors Affecting the Performance of Small Indigenous Contractors in Papau New Guinea

    Directory of Open Access Journals (Sweden)

    Daniel Wasi

    2001-09-01

    Full Text Available Contractors’ performance, amongst other things, has been associated with the high costof public housing in Papua New Guinea. Given that small indigenous contractorsundertake construction of all public housing, this paper investigates the performance ofsmall indigenous contractors.Eight likely factors that affect small indigenous contractors' performance are identifiedfrom the literature. An empirical study is then described aimed at determining how80Page (iv The Australian Journal of Construction Economics and Buildingthese factors affect project cost, time and quality. This comprised a survey conducted inPort Moresby by personally administered questionnaires to a sample of smallindigenous contractors to assess the level of factors associated with the problem of lackof performance. Additionally, the view of each firm concerning the effect of each factoron performance was also obtained. The results show that, with the exception of culture,all the factors are perceived to have an effect of construction performance. It is alsoshown that the incidence of these factors, within the firms surveyed, are quite low. Ofparticular concern is the level of cash flow.

  11. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002... compliance with safety standards performance categories if deemed appropriate for the evaluation or...

  12. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR...

  13. 14 CFR 1274.402 - Contractor acquired property.

    Science.gov (United States)

    2010-01-01

    ... AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923(c), title to property acquired with government funds vests in the government. Under a cost shared... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property....

  14. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising....

  15. 48 CFR 42.402 - Visits to contractors' facilities.

    Science.gov (United States)

    2010-10-01

    ... visit will result in reviewing, auditing, or obtaining any information from the contractor relating to... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Visits to contractors' facilities. 42.402 Section 42.402 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  16. 48 CFR 919.7006 - Incentives for DOE contractor participation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Incentives for DOE contractor participation. 919.7006 Section 919.7006 Federal Acquisition Regulations System DEPARTMENT OF....7006 Incentives for DOE contractor participation. (a) Under cost-plus-award fee contracts, approved...

  17. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance Evaluation. 8.406-7 Section 8.406-7 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  18. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must...

  19. 18 CFR 1308.11 - Contractor's request for relief.

    Science.gov (United States)

    2010-04-01

    ... for relief. 1308.11 Section 1308.11 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY CONTRACT DISPUTES Contracting Officers § 1308.11 Contractor's request for relief. Any request for relief which a Contractor believes is due under a contract shall be submitted to the Contracting Officer...

  20. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    competencies, business, legal and HR competencies are also present. Both engineer-dominated and mixed management boards are heading companies which show growth in turnover. This runs counter to a widespread sector perception that management boards in the construction industry are mainly composed of engineers......Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... organisations and associated processes of competency development in senior management. This paper asks the question: How well is top level management prepared to manage and lead these large companies? The paper adopts a multidisciplinary theoretical approach combining international business, strategic...

  1. Contractor and Government: Teamwork and Commitment

    Science.gov (United States)

    Griffin, Gerald D.

    1984-01-01

    The assigned topic, "Contractor and Government: Teamwork and Commitment," is a subject about vitally interested. The successes of the U.S. space program were built on such teamwork and commitment. It seems only a short time ago that man's role in space was an unknown quantity. In rapid succession, however, the flights of Shepard, Glenn, and Armstrong demonstrated man's capability to live and travel in space. Consequently, we no longer live with the same awe of space. The success of these joint industry-NASA efforts in achieving our Nation's space goals testifies to the validity of our team's past commitment, management expertise, communications techniques, and teamwork over a period of 25 years. Today, however, We are at the beginning of a new era in space.

  2. ENCORE: An extended contractor renormalization algorithm.

    Science.gov (United States)

    Albuquerque, A Fabricio; Katzgraber, Helmut G; Troyer, Matthias

    2009-04-01

    Contractor renormalization (CORE) is a real-space renormalization-group method to derive effective Hamiltionians for microscopic models. The original CORE method is based on a real-space decomposition of the lattice into small blocks and the effective degrees of freedom on the lattice are tensor products of those on the small blocks. We present an extension of the CORE method that overcomes this restriction. Our generalization allows the application of CORE to derive arbitrary effective models whose Hilbert space is not just a tensor product of local degrees of freedom. The method is especially well suited to search for microscopic models to emulate low-energy exotic models and can guide the design of quantum devices.

  3. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    managers from 18 companies has been carried out, providing insight into the basic education and mixing of competences in the top-level boards. More specifically, the areas of operations strategy and IT have been reviewed. The results show that even if the board is mainly composed of engineering......Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... competencies, business, legal and HR competencies are also present. Both engineer-dominated and mixed management boards are heading companies which show growth in turnover. This runs counter to a widespread sector perception that management boards in the construction industry are mainly composed of engineers...

  4. Guideline for the preparation of a contractor safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Stinnett, L

    1982-04-01

    This document is only a guideline for contractors to use in formalizing a safety program or preparing a safety plan. It contains a format of a suggested safety plan as well as pertinent safety elements which should be considered for inclusion. However, consideration of only those items listed may not be sufficient. Each contractor should include in the safety plan particular reference to those elements peculiar to the inherent hazards of the contractor's specific type of construction services, whether the hazard is shown in the list of safety elements or not. Each safety plan should be reviewed annually by the contractor's management. Reissue of the safety plan is mandatory if safety requirements have changed, or if the contractor's address or management (approval signature) has changed.

  5. 77 FR 70780 - Federal Acquisition Regulation; Submission for OMB Review; Contractors Performing Private...

    Science.gov (United States)

    2012-11-27

    ... Regulation; Submission for OMB Review; Contractors Performing Private Security Functions Outside the United... 9000-0184, Contractors Performing Private Security Functions Outside the United States''. Follow the... ``Information Collection 9000-0184, Contractors Performing Private Security Functions Outside the United...

  6. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2012-08-27

    ... Regulation; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense... previously approved information collection requirement concerning contractors' purchasing systems reviews...: Submit comments identified by Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews...

  7. 78 FR 17673 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2013-03-22

    ... previously approved information collection requirement concerning contractors' purchasing systems reviews. A... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods... submit comments only and cite Information Collection 9000-0132, Contractors' Purchasing Systems Reviews...

  8. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ... Regulation; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of...

  9. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ... Regulation; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure... requirement concerning contractor business ethics compliance program and disclosure requirements. Public... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure...

  10. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ... Regulation; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any...

  11. Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa; Durfee, Justin David; Frazier, Christopher Rawls; Jones, Katherine A; Gearhart, Jared Lee

    2016-05-01

    This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

  12. Defense Contractor Recovery of Cleanup Costs at Contractor Owned and Operated Facilitie

    Science.gov (United States)

    1993-09-30

    of Government Contractors for Environmental Damage, 21 Publi Contrags Law Journal 1992, Summer 1992. 1-3 It is the intent of this paper to outline the...from the production of rayon cord used for airplane and jeep tires. The government contracted with FMC for production, but did not own any of the raw...government liable as an "arranger" for groundwater contamination resulting from World War II contracts for the production of high tenacity rayon cord.9

  13. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  14. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... give some leeway in relation to coordination. The derived findings of sub-contractor coordination behavior and key drivers of informal coordination may be tested in a cross-industrial, cross-national quantitative study. This research paper contributes to a gap on informal coordination within projects....

  15. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    Science.gov (United States)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  16. Analysis of dose consequences arising from the release of spent nuclear fuel from dry storage casks.

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, Samuel G.; Morrow, Charles.

    2013-01-01

    The resulting dose consequences from releases of spent nuclear fuel (SNF) residing in a dry storage casks are examined parametrically. The dose consequences are characterized by developing dose versus distance curves using simplified bounding assumptions. The dispersion calculations are performed using the MELCOR Accident Consequence Code System (MACCS2) code. Constant weather and generic system parameters were chosen to ensure that the results in this report are comparable with each other and to determine the relative impact on dose of each variable. Actual analyses of site releases would need to accommodate local weather and geographic data. These calculations assume a range of fuel burnups, release fractions (RFs), three exposure scenarios (2 hrs and evacuate, 2 hrs and shelter, and 24 hrs exposure), two meteorological conditions (D-4 and F-2), and three release heights (ground level 1 meter (m), 10 m, and 100 m). This information was developed to support a policy paper being developed by U.S. Nuclear Regulatory Commission (NRC) staff on an independent spent fuel storage installation (ISFSI) and monitored retrievable storage installation (MRS) security rulemaking.

  17. Spent fuel criticality and compositions evaluation for long-term disposal in a generic cask

    Energy Technology Data Exchange (ETDEWEB)

    Velasquez, C.E.; Sousa, R.V.; Fortini, A.; Pereira, C., E-mail: claubia@nuclear.ufmg.br; Costa, A.L.; Silva, C.A.M. da; Veloso, M.A.F.; Oliveira, A.H. de; Carvalho, F.R. de

    2014-08-15

    The Nuclear Energy Agency (NEA) Expert Group on Burn-up Credit Criticality Safety published a Benchmark with results obtained from simulations with some nuclear codes for a PWR-UO{sub 2} nuclear fuel disposed of in a cask. The same situations were simulated at the Departamento de Engenharia Nuclear/Universidade Federal de Minas Gerais (DEN/UFMG) with the SCALE 6.0 (KENOVI/ORIGENS), MCNPX 2.6.0/CINDER and Monteburns (MCNP5/ORIGEN2.1). Combinations of codes and nuclear data are slightly different from those used by the organizations who participate of the Benchmark. For k{sub eff} time evolution, the results are very similar to the values obtained by the benchmark participants. For decay time evolution, the results obtained for several nuclides presented the expected behavior. Nevertheless, differences in the composition increase during the time specially using the Monteburns code. These differences may be attributed to the libraries and methodology for choosing libraries to decay calculation and the number of days to a year considered to calculations.

  18. Large deformation inelastic analysis of impact for shipping casks. [DYNA3D Code

    Energy Technology Data Exchange (ETDEWEB)

    Charman, C.M.; Grenier, R.M. (General Atomic Co., San Diego, CA (USA)); Nickell, R.E. (Applied Science and Technology, Poway, CA (USA))

    1982-09-01

    This paper describes the use of two- and three-dimensional nonlinear finite element computer programs to design a radioative material transportation cask to withstand a drop of 30 feet onto an unyielding surface. Because of recent advancement in the area of non-linear finite element code development, the use of such codes for an iterative design process is becoming practicable. The paper begins with a section dealing with a two-dimensional side drop analysis and is followed by a discussion of the general capabilities of DYNA3D and a brief discussion of the implementation of the code on a computational mainframe unlike any for which the developer had intended. Then, a section on three-dimensional models of center-of-gravity over a corner impact follows, which introduces design features such as bolted closures, internal impact limiter, seals and shear rings. Figs. showing the deformed model grids are included. Stress and strain results are given in the subsequent section. Finally, we interpret these results in terms of possible rules being developed by the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code committees.

  19. Acoustic emission detection with fiber optical sensors for dry cask storage health monitoring

    Science.gov (United States)

    Lin, Bin; Bao, Jingjing; Yu, Lingyu; Giurgiutiu, Victor

    2016-04-01

    The increasing number, size, and complexity of nuclear facilities deployed worldwide are increasing the need to maintain readiness and develop innovative sensing materials to monitor important to safety structures (ITS). In the past two decades, an extensive sensor technology development has been used for structural health monitoring (SHM). Technologies for the diagnosis and prognosis of a nuclear system, such as dry cask storage system (DCSS), can improve verification of the health of the structure that can eventually reduce the likelihood of inadvertently failure of a component. Fiber optical sensors have emerged as one of the major SHM technologies developed particularly for temperature and strain measurements. This paper presents the development of optical equipment that is suitable for ultrasonic guided wave detection for active SHM in the MHz range. An experimental study of using fiber Bragg grating (FBG) as acoustic emission (AE) sensors was performed on steel blocks. FBG have the advantage of being durable, lightweight, and easily embeddable into composite structures as well as being immune to electromagnetic interference and optically multiplexed. The temperature effect on the FBG sensors was also studied. A multi-channel FBG system was developed and compared with piezoelectric based AE system. The paper ends with conclusions and suggestions for further work.

  20. THERMLIB: a material property data library for thermal analysis of radioactive material transport casks

    Energy Technology Data Exchange (ETDEWEB)

    Ikushima, Takeshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-03-01

    The paper describes an heat conduction data library and graphical program for analysis of radioactive material transport casks. More than 1000 of material data are compiled in the data library which was produced by Lawrence Livermore Laboratory. Thermal data such as, density, thermal conductivity, specific heat, phase-change or solid-state, transition temperature and latent heat have been tabulated. Using this data library, a data library processing program THERMLIB for thermal analysis has been developed. Main features of THERMLIB are as follows: (1) data have been tabulated against temperature, (2) more than 1000 material data are available, (3) it is capable of graphical representations for thermal data and (4) not only main frame computer but also work stations (OS UNIX) and personal computer (OS Windows) are available for use of THERMLIB. In the paper, brief illustration of data library is presented in the first section. The second section presents descriptions of structural data. The third section provides an user`s guide for computer program and input data for THERMLIB. (author)

  1. Estimates of durability of TMI-2 core debris canisters and cask liners

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, A.B. Jr.; Lund, A.L.; Pednekar, S.P.

    1994-04-01

    Core debris from the Three Mile Island-2 (TMI-2) reactor is currently stored in stainless steel canisters. The need to maintain the integrity of the TMI-2 core debris containers through the period of extended storage and possibly into disposal prompted this assessment. In the assessment, corrosion-induced degradation was estimated for two materials: type 304L stainless steel (SS) canisters that contain the core debris, and type 1020 carbon steel (CS) liners in the concrete casks planned for containing the canisters from 2000 AD until the TMI-2 core debris is placed in a repository. Three environments were considered: air-saturated water (with 2 ppM Cl{sup {minus}}) at 20{degree}C, and air at 20{degree}C with two relative humidities (RHs), 10 and 40%. Corrosion mechanisms assessed included general corrosion (failure criterion: 50% loss of wall thickness) and localized attack (failure criterion: through-wall pinhole penetration). Estimation of carbon steel corrosion after 50 y also was requested.

  2. Contractor renormalization group and the Haldane conjecture

    Energy Technology Data Exchange (ETDEWEB)

    Weinstein, Marvin

    2001-05-01

    The contractor renormalization group formalism (CORE) is a real-space renormalization group method which is the Hamiltonian analogue of the Wilson exact renormalization group equations. In an earlier paper [Phys. Rev. D 61, 034505 (2000)] I showed that the CORE method could be used to map a theory of free quarks and quarks interacting with gluons into a generalized frustrated Heisenberg antiferromagnet (HAF) and proposed using CORE methods to study these theories. Since generalizations of HAF's exhibit all sorts of subtle behavior which, from a continuum point of view, are related to topological properties of the theory, it is important to know that CORE can be used to extract this physics. In this paper I show that despite the folklore which asserts that all real-space renormalization group schemes are necessarily inaccurate, simple CORE computations can give highly accurate results even if one only keeps a small number of states per block and a few terms in the cluster expansion. In addition I argue that even very simple CORE computations give a much better qualitative understanding of the physics than naive renormalization group methods. In particular I show that the simplest CORE computation yields a first-principles understanding of how the famous Haldane conjecture works for the case of the spin-1/2 and spin-1 HAF.

  3. Evaluation of Effect of Fuel Assembly Loading Patterns on Thermal and Shielding Performance of a Spent Fuel Storage/Transportation Cask

    Energy Technology Data Exchange (ETDEWEB)

    Cuta, Judith M.; Jenquin, Urban P.; McKinnon, Mikal A.

    2001-11-20

    The licensing of spent fuel storage casks is generally based on conservative analyses that assume a storage system being uniformly loaded with design basis fuel. The design basis fuel typically assumes a maximum assembly enrichment, maximum burn up, and minimum cooling time. These conditions set the maximum decay heat loads and radioactive source terms for the design. Recognizing that reactor spent fuel pools hold spent fuel with an array of initial enrichments, burners, and cooling times, this study was performed to evaluate the effect of load pattern on peak cladding temperature and cask surface dose rate. Based on the analysis, the authors concluded that load patterns could be used to reduce peak cladding temperatures in a cask without adversely impacting the surface dose rates.

  4. Study of casks shielded with heavy metal to transport highly radioactive substances; Estudo de embalados com blindagem em metal pesado para transporte de substancias altamente radioativas

    Energy Technology Data Exchange (ETDEWEB)

    Lucchesi, R.F.; Hara, D.H.S.; Martinez, L.G.; Mucsi, C.S.; Rossi, J.L., E-mail: rflguimaraes@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2014-07-01

    Nowadays, Brazil relies on casks produced abroad for transportation in its territory of substances that are sources of high radioactivity, especially the Mo-99. The product of the radioactive decay of the Mo-99 is the Tc-99m, which is used in nuclear medicine for administration to humans in the form of injectable radioactive drugs for the image diagnosis of numerous pathologies. This paper aims to study the existing casks in order to propose materials for the construction of the core part as shielding against gamma radiation. To this purpose, the existing literature on the subject was studied, as well as evaluation of existing and available casks. The study was focused on the core of which is made of heavy metals, especially depleted uranium for shielding the emitted radiation. (author)

  5. Calculative activation analysis of the transport rack for CASTOR {sup registered} casks; Berechnung der Aktivierung eines Transportgestells fuer CASTOR {sup registered} -Behaelter

    Energy Technology Data Exchange (ETDEWEB)

    Tittelbach, S. [Wissenschaftlich-Technische Ingenieurberatung GmbH (WTI), Juelich (Germany); Biedermann, R. [GNS Gesellschaft fuer Nuklear-Service mbH, Essen (Germany); Schmidt-Wohlfarth, Y.; Louia, A. [EnBW Kernkraft GmbH, Philippsburg (Germany)

    2011-07-01

    The transport rack for the internal transport of loaded CASTOR {sup registered} casks before the storage in the intermediate storage facility at the site of the NPP Philippsburg is exposed to neutron irradiation from the cask inventory. Using the Monte Carlo code MCNP the activation rates of the transport rack materials are calculated for typical storage times of the casks in the rack. The long-term activation was also calculated for the continuous use of the transport rack over 10 years. Further topics were the dose rate in the near surrounding of the transport rack after long-term activation and finally the disposability of rack components according to the legal regulations. The maximum contact dose rate was calculated to be below 1 micro Sv/h after 10 years of application. The transport rack can be disposed with large safety margins to the radiation protection limits.

  6. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Science.gov (United States)

    2010-10-01

    ... Federal Contractor employee travelers by AMTRAK, hotels, motels, or car rental companies, when use of such... employees. (d) Hotels/motels. Many lodging providers extend their discount rates for Federal employees...

  7. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  8. Highway vehicle systems contractors coordination meeting. Seventeenth summary report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Separate abstracts was prepared for each of the 62 papers presented at the Contractors' Coordination meeting on highway vehicle systems. One paper had previously appeared in DOE's data base.

  9. Specification for HEPA filters used by DOE contractors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This standard establishes specification and testing requirements for High Efficiency Particulate Air (HEPA) filters procured to provide personnel and environmental protection when installed in DOE nuclear facilities. The standard specifies minimum requirements to be included in contractor specifications.

  10. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... unallowable costs for reimbursement, and therefore it adds no value. Response 29: The Department agrees that..., litigation against contractors often directly affects the reputation of the Department and, directly or...

  11. CAPSIZE: A personal computer program and cross-section library for determining the shielding requirements, size, and capacity of shipping casks subject to various proposed objectives

    Energy Technology Data Exchange (ETDEWEB)

    Bucholz, J.A.

    1987-05-01

    A new interactive program called CAPSIZE has been written for the IBM-PC to rapidly determine the likely impact that proposed design objectives might have on the size and capacity of spent fuel shipping casks designed to meet those objectives. Given the burnup of the spent fuel, its cooling time, the thickness of the internal basket walls, the desired external dose rate, and the nominal weight limit of the loaded cask, the CAPSIZE program will determine the maximum number of PWR fuel assemblies that may be shipped in a lead-, steel-, or uranium-shielded cask meeting those objectives. The necessary neutron and gamma shield thicknesses are determined by the program in such a way as to meet the specified external dose rate while simultaneously minimizing the overall weight of the loaded cask. The one-group cross-section library used in the CAPSIZE program has been distilled from the intermediate results of several hundred 1-D multigroaup discrete ordinates calculations for different types of casks. Neutron and gamma source terms, as well as the decay heat terms, are based on ORIGEN-S analyses of PWR fuel assemblies having exposures of 10, 20, 30, 40, 50, and 60 gigawatt days per metric tonne of initial heavy metal (GWD/MTIHM). In each case, values have been tabulated at 17 different decay times between 120 days and 25 years. Other features of the CAPSIZE program include a steady-state heat transfer calculation which will minimize the size and weight of external cooling fins, if and when such fins are required. Comparisons with previously reported results show that the CAPSIZE program can generally estimate the necessary neutron and gamma shield thicknesses to within 0.16 in. and 0.08 in., respectively. The corresponding cask weights have generally been found to be within 1000 lbs of previously reported results. 13 refs., 20 figs., 54 tabs.

  12. Shielding Research of Cobalt Adjuster Rod Transport Cask%钴调节棒转运容器屏蔽研究

    Institute of Scientific and Technical Information of China (English)

    王炳衡; 薛娜; 毛亚蔚

    2013-01-01

    Dose rates at the surface of adjuster rod transport cask were calculated with MCNP code and MCAM code.The calculation results were compared with national standard to estimate shielding design of the cask.To meet the requirement of the standard,original design of the cask was updated through the calculation of these codes.To reduce the radiation level,temporary shielding for the gap (between shielding door and main cask) was applied and 5 cm shielding layer of depleted uranium was applied to the side shield instead of 5 cm lead layer.According to the results,new shielding design of transport cask can meet the national standard.The measuring results show that the design of the cask is reasonable and reliable.%采用MCAM程序与MCNP程序模拟计算钴调节棒转运容器的表面剂量率,并以此来判断容器的屏蔽设计是否满足标准要求.通过程序系统估算,在容器初始设计模型的基础上将5 cm铅层替换为5cm贫铀防护层,并提出了在容器下部屏蔽门缝隙处增加临时屏蔽装置以降低该处的辐射水平.经过优化设计后,钴调节棒转运容器能够满足国家相应的屏蔽标准要求.现场操作时的实测结果也进一步验证了容器屏蔽设计的合理性和可靠性.

  13. Human Resources Staffing Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    BOSLEY, J.W.

    2000-04-22

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline.

  14. Analysis, scale modeling, and full-scale test of a railcar and spent-nuclear-fuel shipping cask in a high-velocity impact against a rigid barrier

    Energy Technology Data Exchange (ETDEWEB)

    Huerta, M.

    1981-06-01

    This report describes the mathematical analysis, the physical scale modeling, and a full-scale crash test of a railcar spent-nuclear-fuel shipping system. The mathematical analysis utilized a lumped-parameter model to predict the structural response of the railcar and the shipping cask. The physical scale modeling analysis consisted of two crash tests that used 1/8-scale models to assess railcar and shipping cask damage. The full-scale crash test, conducted with retired railcar equipment, was carefully monitored with onboard instrumentation and high-speed photography. Results of the mathematical and scale modeling analyses are compared with the full-scale test. 29 figures.

  15. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor shall submit NASA Contractor Financial Management Reports on NASA Forms 533 in accordance with the...

  16. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ... Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of Defense (DoD... contractors have implemented the mandatory contractor business ethics program requirements. DATES: Effective... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  17. 37 CFR 401.9 - Retention of rights by contractor employee inventor.

    Science.gov (United States)

    2010-07-01

    ... contractor employee inventor. 401.9 Section 401.9 Patents, Trademarks, and Copyrights ASSISTANT SECRETARY FOR... by contractor employee inventor. Agencies which allow an employee/inventor of the contractor to... nonprofit organization contractor, as authorized by 35 U.S.C. 202(d), will impose upon the inventor at...

  18. 42 CFR 405.874 - Appeals of CMS or a CMS contractor.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Appeals of CMS or a CMS contractor. 405.874 Section... Part B Program § 405.874 Appeals of CMS or a CMS contractor. A CMS contractor's (that is, a carrier... supplier enrollment application. If CMS or a CMS contractor denies a provider's or supplier's...

  19. Creation of a Geant4 Muon Tomography Package for Imaging of Nuclear Fuel in Dry Cask Storage

    Energy Technology Data Exchange (ETDEWEB)

    Tsoukalas, Lefteri H. [Purdue Univ., West Lafayette, IN (United States)

    2016-03-01

    This is the final report of the NEUP project “Creation of a Geant4 Muon Tomography Package for Imaging of Nuclear Fuel in Dry Cask Storage”, DE-NE0000695. The project started on December 1, 2013 and this report covers the period December 1, 2013 through November 30, 2015. The project was successfully completed and this report provides an overview of the main achievements, results and findings throughout the duration of the project. Additional details can be found in the main body of this report and on the individual Quarterly Reports and associated Deliverables of the project, uploaded in PICS-NE.

  20. Human machine interface to manually drive rhombic like vehicles such as transport casks in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, Pedro; Vale, Alberto [Instituto de Plasmas e Fusao Nuclear, Instituto Superior Tecnico, Universidade de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal); Ventura, Rodrigo [Institute for Systems and Robotics, Instituto Superior Tecnico, Universidade de Lisboa, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2015-07-01

    The Cask and Plug Remote Handling System (CPRHS) and the respective Cask Transfer System (CTS) are designed to transport activated components between the reactor and the hot cell buildings of ITER during maintenance operations. In nominal operation, the CPRHS/CTS shall operate autonomously under human supervision. However, in some unexpected situations, the automatic mode must be overridden and the vehicle must be remotely guided by a human operator due to the harsh conditions of the environment. The CPRHS/CTS is a rhombic-like vehicle with two independent steerable and drivable wheels along its longitudinal axis, giving it omni-directional capabilities. During manual guidance, the human operator has to deal with four degrees of freedom, namely the orientations and speeds of two wheels. This work proposes a Human Machine Interface (HMI) to manage the degrees of freedom and to remotely guide the CPRHS/CTS in ITER taking the most advantages of rhombic like capabilities. Previous work was done to drive each wheel independently, i.e., control the orientation and speed of each wheel independently. The results have shown that the proposed solution is inefficient. The attention of the human operator becomes focused in a single wheel. In addition, the proposed solution cannot assure that the commands accomplish the physical constrains of the vehicle, resulting in slippage or even in clashes. This work proposes a solution that consists in the control of the vehicle looking at the position of its center of mass and its heading in the world frame. The solution is implemented using a rotational disk to control the vehicle heading and a common analogue joystick to control the vector speed of the center of the mass of the vehicle. The number of degrees of freedom reduces to three, i.e., two angles (vehicle heading and the orientation of the vector speed) and a scalar (the magnitude of the speed vector). This is possible using a kinematic model based on the vehicle Instantaneous

  1. Developing a structural health monitoring system for nuclear dry cask storage canister

    Science.gov (United States)

    Sun, Xiaoyi; Lin, Bin; Bao, Jingjing; Giurgiutiu, Victor; Knight, Travis; Lam, Poh-Sang; Yu, Lingyu

    2015-03-01

    Interim storage of spent nuclear fuel from reactor sites has gained additional importance and urgency for resolving waste-management-related technical issues. In total, there are over 1482 dry cask storage system (DCSS) in use at US plants, storing 57,807 fuel assemblies. Nondestructive material condition monitoring is in urgent need and must be integrated into the fuel cycle to quantify the "state of health", and more importantly, to guarantee the safe operation of radioactive waste storage systems (RWSS) during their extended usage period. A state-of-the-art nuclear structural health monitoring (N-SHM) system based on in-situ sensing technologies that monitor material degradation and aging for nuclear spent fuel DCSS and similar structures is being developed. The N-SHM technology uses permanently installed low-profile piezoelectric wafer sensors to perform long-term health monitoring by strategically using a combined impedance (EMIS), acoustic emission (AE), and guided ultrasonic wave (GUW) approach, called "multimode sensing", which is conducted by the same network of installed sensors activated in a variety of ways. The system will detect AE events resulting from crack (case for study in this project) and evaluate the damage evolution; when significant AE is detected, the sensor network will switch to the GUW mode to perform damage localization, and quantification as well as probe "hot spots" that are prone to damage for material degradation evaluation using EMIS approach. The N-SHM is expected to eventually provide a systematic methodology for assessing and monitoring nuclear waste storage systems without incurring human radiation exposure.

  2. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  3. Impact of modeling Choices on Inventory and In-Cask Criticality Calculations for Forsmark 3 BWR Spent Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Martinez-Gonzalez, Jesus S. [Univ. Politecnica de Madrid (Spain); Ade, Brian J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bowman, Stephen M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gauld, Ian C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ilas, Germina [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Marshall, William BJ J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-01-01

    Simulation of boiling water reactor (BWR) fuel depletion poses a challenge for nuclide inventory validation and nuclear criticality safety analyses. This challenge is due to the complex operating conditions and assembly design heterogeneities that characterize these nuclear systems. Fuel depletion simulations and in-cask criticality calculations are affected by (1) completeness of design information, (2) variability of operating conditions needed for modeling purposes, and (3) possible modeling choices. These effects must be identified, quantified, and ranked according to their significance. This paper presents an investigation of BWR fuel depletion using a complete set of actual design specifications and detailed operational data available for five operating cycles of the Swedish BWR Forsmark 3 reactor. The data includes detailed axial profiles of power, burnup, and void fraction in a very fine temporal mesh for a GE14 (10×10) fuel assembly. The specifications of this case can be used to assess the impacts of different modeling choices on inventory prediction and in-cask criticality, specifically regarding the key parameters that drive inventory and reactivity throughout fuel burnup. This study focused on the effects of the fidelity with which power history and void fraction distributions are modeled. The corresponding sensitivity of the reactivity in storage configurations is assessed, and the impacts of modeling choices on decay heat and inventory are addressed.

  4. Effects of T-type Channel on Natural Convection Flows in Airflow-Path of Concrete Storage Cask

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Gyeong Uk; Kim, Hyoung Jin; Cho, Chun Hyung [KORAD, Daejeon (Korea, Republic of)

    2016-05-15

    The natural convection flows occurring in airflow-path are not simple due to complex flow-path configurations such as horizontal ducts, bent tube and annular flow-path. In addition, 16 T type channels acting as the shroud are attached vertically and 16 channel supporting the canister are attached horizontally on the inner surface of over-pack. The existence and nonexistence of T type channels have influences on the flow fields in airflow- path. The concrete storage cask has to satisfy the requirements to secure the thermal integrity under the normal, off-normal, and accident conditions. The present work is aiming at investigating the effects of T type channels on the flows in airflow-path under the normal conditions using the FLUENT 16.1 code. In order to focus on the flows in airflow-path, fuel regions in the canister are regarded as a single cylinder with heat sources and other components are fully modeled. This study investigated the flow fields in airflow-path of concrete storage cask, numerically. It was found that excepting for the fuel regions, maximum temperatures on other components were evaluated below allowable values. The location of maximum velocities depended on support channels, T type channels and flow area. The flows through air inlets developed along annular flow- path with forming the hot plumes. According to the existence and nonexistence of T type channel, the plume behavior showed the different flow patterns.

  5. Liprin-α2 promotes the presynaptic recruitment and turnover of RIM1/CASK to facilitate synaptic transmission.

    Science.gov (United States)

    Spangler, Samantha A; Schmitz, Sabine K; Kevenaar, Josta T; de Graaff, Esther; de Wit, Heidi; Demmers, Jeroen; Toonen, Ruud F; Hoogenraad, Casper C

    2013-06-10

    The presynaptic active zone mediates synaptic vesicle exocytosis, and modulation of its molecular composition is important for many types of synaptic plasticity. Here, we identify synaptic scaffold protein liprin-α2 as a key organizer in this process. We show that liprin-α2 levels were regulated by synaptic activity and the ubiquitin-proteasome system. Furthermore, liprin-α2 organized presynaptic ultrastructure and controlled synaptic output by regulating synaptic vesicle pool size. The presence of liprin-α2 at presynaptic sites did not depend on other active zone scaffolding proteins but was critical for recruitment of several components of the release machinery, including RIM1 and CASK. Fluorescence recovery after photobleaching showed that depletion of liprin-α2 resulted in reduced turnover of RIM1 and CASK at presynaptic terminals, suggesting that liprin-α2 promotes dynamic scaffolding for molecular complexes that facilitate synaptic vesicle release. Therefore, liprin-α2 plays an important role in maintaining active zone dynamics to modulate synaptic efficacy in response to changes in network activity.

  6. Evaluation of impact limiter performance during end-on and slapdown drop tests of a one-third scale model storage/transport cask system

    Energy Technology Data Exchange (ETDEWEB)

    Yoshimura, H.R.; Bronowski, D.R.; Uncapher, W.L.; Attaway, S.W.; Bateman, V.I.; Carne, T.G.; Gregory, D.L. (Sandia National Labs., Albuquerque, NM (USA)); Huerta, M. (Southwest Engineering Associates, El Paso, TX (USA))

    1990-12-01

    This report describes drop testing of a one-third scale model shipping cask system. Two casks were designed and fabricated by Transnuclear, Inc., to ship spent fuel from the former Nuclear Fuel Services West Valley reprocessing facility in New York to the Idaho National Engineering Laboratory for a long-term spent fuel dry storage demonstration project. As part of the NRC's regulatory certification process, one-third scale model tests were performed to obtain experimental data on impact limiter performance during impact testing. The objectives of the testing program were to (1) obtain deceleration and displacement information for the cask and impact limiter system, (2) obtain dynamic force-displacement data for the impact limiters, (3) verify the integrity of the impact limiter retention system, and (4) examine the crush behavior of the limiters. Two 30-ft (9-m) drop tests were conducted on a mass model of the cask body and scaled balsa and redwood-filled impact limiters. This report describes the results of both tests in terms of measured decelerations, posttest deformation measurements, and the general structural response of the system. 3 refs., 32 figs.

  7. A criticality analysis of the GBC-32 dry storage cask with Hanbit nuclear power plant unit 3 fuel assemblies from the viewpoint of burnup credit

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Hyung Ju; Kim, Do Yeon; Park, Kwang Heon; Hong, Ser Gi [Dept. of Nuclear Engineering, Kyung Hee University, Seoul (Korea, Republic of)

    2016-06-15

    Nuclear criticality safety analyses (NCSAs) considering burnup credit were performed for the GBC-32 cask. The used nuclear fuel assemblies (UNFAs) discharged from Hanbit Nuclear Power Plant Unit 3 Cycle 6 were loaded into the cask. Their axial burnup distributions and average discharge burnups were evaluated using the DeCART and Multi-purpose Analyzer for Static and Transient Effects of Reactors (MASTER) codes, and NCSAs were performed using SCALE 6.1/STandardized Analysis of Reactivity for Burnup Credit using SCALE (STARBUCS) and Monte Carlo N-Particle transport code, version 6 (MCNP 6). The axial burnup distributions were determined for 20 UNFAs with various initial enrichments and burnups, which were applied to the criticality analysis for the cask system. The UNFAs for 20- and 30-year cooling times were assumed to be stored in the cask. The criticality analyses indicated that keff values for UNFAs with nonuniform axial burnup distributions were larger than those with a uniform distribution, that is, the end effects were positive but much smaller than those with the reference distribution. The axial burnup distributions for 20 UNFAs had shapes that were more symmetrical with a less steep gradient in the upper region than the reference ones of the United States Department of Energy. These differences in the axial burnup distributions resulted in a significant reduction in end effects compared with the reference.

  8. Selection of disposal contractor by multi criteria decision making methods

    Directory of Open Access Journals (Sweden)

    Cenker Korkmazer

    2016-08-01

    Full Text Available Hazardous waste is substance that threaten people and environment in case of improper storage, disposal and transport due to its concentration, physical and chemical properties. Companies producing hazardous waste as a result of several activities mostly do not have any own disposal facilities. In addition, they do not pay attention enough to determine the right contractor as a disposal facility. On the other hand, there are various qualitative and quantitative criteria affecting the selection of the contractor and conflicting with each other. The aim of the performed study is to assist one of these companies producing hazardous waste in the selection of the best contractor that eliminates hazardous waste economic and harmless way. In the study, contractor weights in percentage is calculated by using Analytic Network Process (ANP as one of the multi-criteria decision making (MCDM methods and widely used in the literature which considers both qualitative and quantitative criteria. In the next step, by the help of the mathematical model, contractors that will be given which type of hazardous waste are identified. This integrated approach can be used as a guide for similar firms.

  9. Spectrum of pontocerebellar hypoplasia in 13 girls and boys with CASK mutations: confirmation of a recognizable phenotype and first description of a male mosaic patient

    Directory of Open Access Journals (Sweden)

    Burglen Lydie

    2012-03-01

    Full Text Available Abstract Background Pontocerebellar hypoplasia (PCH is a heterogeneous group of diseases characterized by lack of development and/or early neurodegeneration of cerebellum and brainstem. According to clinical features, seven subtypes of PCH have been described, PCH type 2 related to TSEN54 mutations being the most frequent. PCH is most often autosomal recessive though de novo anomalies in the X-linked gene CASK have recently been identified in patients, mostly females, presenting with intellectual disability, microcephaly and PCH (MICPCH. Methods Fourteen patients (12 females and two males; aged 16 months-14 years presenting with PCH at neuroimaging and with clinical characteristics unsuggestive of PCH1 or PCH2 were included. The CASK gene screening was performed using Array-CGH and sequencing. Clinical and neuroradiological features were collected. Results We observed a high frequency of patients with a CASK mutation (13/14. Ten patients (8 girls and 2 boys had intragenic mutations and three female patients had a Xp11.4 submicroscopic deletion including the CASK gene. All were de novo mutations. Phenotype was variable in severity but highly similar among the 11 girls and was characterized by psychomotor retardation, severe intellectual disability, progressive microcephaly, dystonia, mild dysmorphism, and scoliosis. Other signs were frequently associated, such as growth retardation, ophthalmologic anomalies (glaucoma, megalocornea and optic atrophy, deafness and epilepsy. As expected in an X-linked disease manifesting mainly in females, the boy hemizygous for a splice mutation had a very severe phenotype with nearly no development and refractory epilepsy. We described a mild phenotype in a boy with a mosaic truncating mutation. We found some degree of correlation between severity of the vermis hypoplasia and clinical phenotype. Conclusion This study describes a new series of PCH female patients with CASK inactivating mutations and confirms that

  10. Final Report - Independent Confirmatory Survey Summary and Results for the Hematite Decommissioning Project

    Energy Technology Data Exchange (ETDEWEB)

    E.N. Bailey

    2009-03-18

    The objectives of the confirmatory surveys were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee’s procedures and survey results.

  11. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  12. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  13. Credit Assessment of Contractors: A Rough Set Method

    Institute of Scientific and Technical Information of China (English)

    LIU Gaojun; ZHU Yan

    2006-01-01

    A rough set method is presented in this paper to assess the credit of contractors. Unlike traditional methods, the rough set method deduces credit-classifying rules from actual data to predict new cases. The method uses a contractors' database with a genetic algorithm and an exhaustive reduction implemented using ROSETTA software that integrates rough set method. The classification accuracy of the rough set model is not as good as that of a decision tree, logistic regression, and neural network models, but the rough set model more accurately predicts contractors with bad credit. The results show that the rough set model is especially useful for detecting corporations with bad credit in the currently disordered Chinese construction market.

  14. Financing Small Scale Contractors through Mobilization Advance Payments for Improved Performance: The Case of the Tamale Metropolis

    Directory of Open Access Journals (Sweden)

    Debrah Kwame Donkor

    2014-11-01

    Full Text Available The construction industry plays an important role in any economy, and its activities are vital to the achievement of the socio-economic development goals of a nation. In Ghana, the construction and housing industry plays an immeasurable role in the national developmental agenda. What however, appears to be debatable is whether the industry wields the much expected driving force required to pronounce its vital contribution towards accelerated national growth in terms of infrastructural development. This paper assesses the extent to which Mobilization Advance Payment (MAP contribute to the output of small scale contractors in the Tamale metropolis. Thirty (30 construction firms, fifteen (15 consultancy firms and fifteen (15 financial institutions were surveyed, and Chi-Squared (X2 test at α=0.05was run on responses using SPSS. The study revealed that 49% of key stakeholders in the construction industry in the Tamale metropolis see mobilization advance payment from clients as the most accessible and affordable form of construction financing. This was closely followed by Banks/Saving & Loans (regulated financial institution with 43%, and 8% for non-regulated financial institutions. A significantly high number of consultants (60% agreed that mobilization advance payment is the most accessible and affordable form of construction financing. The Chi-Squared (X2 Test on MAP and contractors performance also revealed an X2 statistic of ≈0.711 for a degrees of freedom of 4 which means that MAP arrangements for contractors contribute significantly to their output. Regrettable though, the misappropriation or misuse of such funds by some contractors has resulted in difficulties in accessing mobilization advance payments even by genuine contractors in dire need of working capital. Abandoned projects, delay in project delivery, cost overruns and employment of unqualified personnel among others result from the unavailability of this accessible and affordable

  15. REVIEW OF FAST FLUX TEST FACILITY (FFTF) FUEL EXPERIMENTS FOR STORAGE IN INTERIM STORAGE CASKS (ISC)

    Energy Technology Data Exchange (ETDEWEB)

    CHASTAIN, S.A.

    2005-10-24

    Appendix H, Section H.3.3.10.11 of the Final Safety Analysis Report (FSAR), provides the limits to be observed for fueled components authorized for storage in the Fast Flux Test Facility (FFTF) spent fuel storage system. Currently, the authorization basis allows standard driver fuel assemblies (DFA), as described in the FSAR Chapter 17, Section 17.5.3.1, to be stored provided decay power per assembly is {le} 250 watts, post-irradiation time is four years minimum, average assembly burn-up is 150,000 MWD/MTHM maximum and the pre-irradiation enrichment is 29.3% maximum (per H.3.3.10.11). In addition, driver evaluation (DE), core characterizer assemblies (CCA), and run-to-cladding-breach (RTCB) assemblies are included based on their similarities to a standard DFA. Ident-69 pin containers with fuel pins from these DFAs can also be stored. Section H.3.3.10.11 states that fuel types outside the specification criteria above will be addressed on a case-by-case basis. There are many different types of fuel and blanket experiments that were irradiated in the FFTF which now require offload to the spent fuel storage system. Two reviews were completed for a portion of these special type fuel components to determine if placement into the Core Component Container (CCC)/Interim Storage Cask (ISC) would require any special considerations or changes to the authorization basis. Project mission priorities coupled with availability of resources and analysts prevented these evaluations from being completed as a single effort. Areas of review have included radiological accident release consequences, radiological shielding adequacy, criticality safety, thermal limits, confinement, and stress. The results of these reviews are available in WHC-SD-FF-RPT-005, Rev. 0 and 1, ''Review of FFTF Fuel Experiments for Storage at ISA'', (Reference I), which subsequently allowed a large portion of these components to be included in the authorization basis (Table H.3.3-21). The

  16. Private security and military contractors: A troubling oversight

    DEFF Research Database (Denmark)

    Swed, Ori; Crosbie, Thomas Alexander

    2017-01-01

    Though private military and security companies (PMSCs) have been addressed extensively in the literature, little research has been done on the contractors themselves, leaving us in the dark as to who these individuals are. In this article, we focus on the critical case of the United States armed...... and concomitant evolution of the security sector, while noting a new trend that points to the need for moving from the macrosocial to the microsocial level of inquiry. Second, we indicate the challenges contractors pose to the sociological paradigm of military professionalism: These suggest a need to move from...

  17. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...

  18. Final proceedings of the second solar heating and cooling commercial demonstration program contractors' review. Volume 1. Summary and analysis

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    The Second Solar Heating and Cooling Commercial Demonstration Program Contractors' Review was attended by over 300 representatives from demonstration projects, the Department of Energy (DOE), other Federal agencies, and Government contractors. This volume presents a thorough study of the 140 project papers printed in the three-volume proceedings. A comprehensive table describing the 140 sites is included. This table presents a description of the sites not only in terms of equipment and performance, but also those regarding their problems, successes, and other experiences. The panel discussions on demonstration projects, the National Solar Data Program and the Commercial Demonstration Program are summarized and analyzed. The results of a special survey of Commercial Demonstration Program contractors are presented. Finally, the results of a polling of Review participants on the effectiveness of the meeting are detailed. (WHK)

  19. Radiological characterization of container materials after interim storage using the example of CASTOR {sup registered} casks; Radiologische Charakterisierung von Behaelterwerkstoffen nach der Zwischenlagerung am Beispiel von CASTOR {sup registered} -Behaeltern

    Energy Technology Data Exchange (ETDEWEB)

    Rother, W. [WTI Wissenschaftlich-Technische Ingenieurberatung GmbH, Juelich (Germany); Graf, R.; Winterhagen, D. [GNS Gesellschaft fuer Nuklear-Service mbH, Essen (Germany)

    2012-11-01

    During interim storage the spent fuel casks or the casks for high-level waste (HAW) coquilles are exposed to neutron irradiation from their inventory that induces activation of the pannier the container body and its components. The presented contribution is an exemplary calculation of mean radial and axial reaction rates for components of HAW coquille or PWR fuel element loaded casks of the type CASTOR {sup registered} HAW28M and CASTOR {sup registered} V/19. The results of the Monte Carlo calculations include statistical uncertainties dependent on several parameters. Using the typical assumption that the casks will be unloaded after 40 years of interim storage the specific activities of significant reaction products are radiological assessed for further 60 years. An unrestricted release according paragraph 29 StrlSchV is discussed.

  20. 48 CFR 436.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... Construction 436.201 Evaluation of contractor performance. Preparation of performance evaluation reports. In addition to the requirements of FAR 36.201, performance evaluation reports shall be prepared for indefinite... of services to be ordered exceeds $500,000.00. For these contracts, performance evaluation...

  1. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements for preparing past performance evaluations for construction contracts. ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of...

  2. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ...) 48 CFR 36.201. Access to reports is through the CPS or the government-wide system, Past Performance... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND...

  3. 48 CFR 236.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTS Special Aspects of Contracting for Construction 236.201 Evaluation of contractor performance. (a) Preparation of performance evaluation reports. Use DD Form 2626, Performance Evaluation (Construction... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Evaluation of...

  4. A Contractor’s Introduction to the Federal Acquisition System

    Science.gov (United States)

    2005-08-12

    18 6. Labor law s...certain types of contract work. Also, there are labor laws and policies that contractors must adhere to when working for the Government. The type of...for bodily injury and $20,000 per occurrence for property damage. 20 6. Labor laws It is vital for the Government to maintain sound relations with

  5. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  6. 49 CFR 633.17 - PMO contractor eligibility.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false PMO contractor eligibility. 633.17 Section 633.17..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17 PMO... connection with a major capital project, with the following exceptions: (1) An entity may not provide PMO...

  7. Impact of the Expanding Role of Contractors: Vital in War

    Science.gov (United States)

    2011-03-24

    5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Colonel Ronda G. Urey Department of Military...CONTRACTORS: VITAL IN WAR by Lieutenant Colonel Theodore M. Lennon United States Army Colonel Ronda G. Urey Project

  8. 28 CFR 548.14 - Community involvement (volunteers, contractors).

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Community involvement (volunteers... Community involvement (volunteers, contractors). (a) The institution's chaplain may contract with representatives of faith groups in the community to provide specific religious services which the chaplain...

  9. 48 CFR 819.7105 - Incentives for prime contractor participation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Incentives for prime... Incentives for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(e), VA is authorized to provide appropriate incentives to encourage subcontracting opportunities for small...

  10. DOE Human Genome Program contractor-grantee workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  11. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Science.gov (United States)

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...

  12. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  13. Preaward Evaluation and Responsibility Determination of Foreign Contractors.

    Science.gov (United States)

    1988-12-01

    3 Contractor Country Contract Number Bundesamt Fuer Wehrtechnik FRG DAJA3786C0326 Bundesamt Fuer Wehrtechnik FRG F6154686D0022 Construcciones ...Aeronauticas SA Spain F0960385C0006 Construcciones Aeronauticas SA Spain F4260086C6464 Daimler Benz AG FRG DAJA3778GOO11 Eaton Corp. FRG F0960382D0663

  14. 48 CFR 3052.204-71 - Contractor employee access.

    Science.gov (United States)

    2010-10-01

    ... Government facilities or access to sensitive information or IT resources are required to have a favorably... the subcontractor may have access to Government facilities, sensitive information, or resources. (End... for mutual convenience while the contractor performs business for the DHS Component. It is not a...

  15. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... prohibition does not preclude the award of a “turnkey” subcontract so long as the subcontractor assumes all... versus lease determinations. Contractors shall determine whether required equipment and property should be purchased or leased, and establish appropriate thresholds for application of lease versus purchase...

  16. Ensuring Operational Access: Leveraging Engineering Contractors in the Pacific

    Science.gov (United States)

    2015-05-21

    improvement or construction of advanced bases, air points of debarkation, sea points of debarkation, highways, railroads , bridges, tunnels and...as the primary contractor responsible for construction on Wake, Midway Island, and an underground fuel storage facility on Oahu, Hawaii. Morrison...order of precedence: airfields, roads, railroads , ports, and logistics bases.126 MACV required additional bases with air and sea points of

  17. Maintaining Readiness in a World of Declining Contractor Support

    Science.gov (United States)

    2013-04-16

    September 2003. Business Week. Lexis -Nexis. (21 March 2006). Blizzard, Stephen M. “Increasing Reliance on Contractors on the Battlefield: How Do...Pafford. “Hazardous Duty Companies Face Risks in Providing Overseas Support in the War on Terror.” Legal Times. 1 April 2002. Lexis -Nexis. [17 March

  18. 48 CFR 1553.209-70 - EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance.

    Science.gov (United States)

    2010-10-01

    ..., Contracting Officer's Evaluation of Contractor Performance. 1553.209-70 Section 1553.209-70 Federal... 1553.209-70 EPA Form 1900-26, Contracting Officer's Evaluation of Contractor Performance. As prescribed... evaluation of Contractor performance....

  19. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    Science.gov (United States)

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  20. 48 CFR 45.606-2 - Contractor without an approved scrap procedure.

    Science.gov (United States)

    2010-10-01

    ... approved scrap procedure. 45.606-2 Section 45.606-2 Federal Acquisition Regulations System FEDERAL... Contractor without an approved scrap procedure. The contractor shall submit an inventory disposal schedule for all scrap....

  1. 76 FR 52133 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Science.gov (United States)

    2011-08-19

    ... Acquisition Regulation Supplement; Contractors Performing Private Security Functions (DFARS Case 2011-D023..., equipping, and conduct of personnel performing private security functions. DATES: Effective Date: August 19.... 110-181, enacted October 28, 2008), section 862, entitled ``Contractors Performing Private...

  2. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Science.gov (United States)

    2013-11-27

    ...; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information... Operators to Report Contractor Management Information System (MIS) Data; and New Method for Operators to... ``user name'' and ``password'' for the Drug and Alcohol Management Information System (DAMIS)...

  3. Report on audit of Department of Energy contractor occupational injury and illness reporting practices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-07

    The Department and its contractors are responsible for ensuring that a safe and healthy work environment is provided to Department and contractor employees at its operating facilities. Contractors are responsible for establishing a comprehensive occupational safety and health program, which includes reporting of significant work-related employee injuries. The Department is responsible for monitoring the implementation of the contractor`s programs. Two performance indicators used by the Department to measure a contractor`s safety performance are the number and severity of work-related employee injuries and of lost workdays rates. The objective of the audit was to determine whether Department of Energy contractors accurately reported occupational injuries and illnesses in accordance with Departmental requirements.

  4. A methodology to quantify the release of spent nuclear fuel from dry casks during security-related scenarios.

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, Samuel G.; Luna, Robert Earl

    2013-11-01

    Assessing the risk to the public and the environment from a release of radioactive material produced by accidental or purposeful forces/environments is an important aspect of the regulatory process in many facets of the nuclear industry. In particular, the transport and storage of radioactive materials is of particular concern to the public, especially with regard to potential sabotage acts that might be undertaken by terror groups to cause injuries, panic, and/or economic consequences to a nation. For many such postulated attacks, no breach in the robust cask or storage module containment is expected to occur. However, there exists evidence that some hypothetical attack modes can penetrate and cause a release of radioactive material. This report is intended as an unclassified overview of the methodology for release estimation as well as a guide to useful resource data from unclassified sources and relevant analysis methods for the estimation process.

  5. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  6. Actinide-only and full burn-up credit in criticality assessment of RBMK-1500 spent nuclear fuel storage cask using axial burn-up profile

    Energy Technology Data Exchange (ETDEWEB)

    Barkauskas, V., E-mail: vytenis.barkauskas@ftmc.lt; Plukiene, R., E-mail: rita.plukiene@ftmc.lt; Plukis, A., E-mail: arturas.plukis@ftmc.lt

    2016-10-15

    Highlights: • RBMK-1500 fuel burn-up impact on k{sub eff} in the SNF cask was calculated using SCALE 6.1. • Positive end effect was noticed at certain burn-up for the RBMK-1500 spent nuclear fuel. • The non-uniform uranium depletion is responsible for the end effect in RBMK-1500 SNF. • k{sub eff} in the SNF cask does not exceed a value of 0.95 which is set in the safety requirements. - Abstract: Safe long-term storage of spent nuclear fuel (SNF) is one of the main issues in the field of nuclear safety. Burn-up credit application in criticality analysis of SNF reduces conservatism of usually used fresh fuel assumption and implies a positive economic impact for the SNF storage. Criticality calculations of spent nuclear fuel in the CONSTOR® RBMK-1500/M2 cask were performed using pre-generated ORIGEN-ARP spent nuclear fuel composition libraries, and the results of the RBMK-1500 burn-up credit impact on the effective neutron multiplication factor (k{sub eff}) have been obtained and are presented in the paper. SCALE 6.1 code package with the STARBUCKS burn-up credit evaluation tool was used for modeling. Pre-generated ARP (Automatic Rapid Processing) crosssection libraries based on ENDF/B-VII cross section library were used for fast burn-up inventory modeling. Different conditions in the SNF cask were modeled: 2.0% and 2.8% initial enrichment fuel of various burn-up and water density inside cavities of the SNF cask. The fuel composition for the criticality analysis was chosen taking into account main actinides and most important fission products used in burn-up calculations. A significant positive end effect is noticed from 15 GWd/tU burn-up for 2.8% enrichment fuel and from 9 GWd/tU for 2.0% enrichment fuel applying the actinide-only approach. The obtained results may be applied in further evaluations of the RBMK type reactor SNF storage as well as help to optimize the SNF storage volume inside the CONSTOR® RBMK-1500/M2 cask without compromising criticality

  7. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) (a) The Contractor...

  8. 75 FR 6669 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2010-02-10

    ... contractors' purchasing systems reviews. A request for public comments was published in the Federal Register....cundiff@gsa.gov . SUPPLEMENTARY INFORMATION: A. Purpose The objective of a contractor purchasing system... Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews AGENCIES: Department of...

  9. 48 CFR 2945.104 - Review and correction of contractors' property control systems.

    Science.gov (United States)

    2010-10-01

    ... contractors' property control systems. 2945.104 Section 2945.104 Federal Acquisition Regulations System... contractors' property control systems. When the Government's property administrator determines that review and approval of the contractor's property control system rests with DOL, the Government's property...

  10. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... be given an unfair competitive advantage based on the performance of the contract? (2) NRC's ultimate... an unfair competitive advantage for the offeror or contractor. (v) Where the offeror or contractor... its work for the NRC or might result in an unfair competitive advantage for the offeror or contractor...

  11. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984)...

  12. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-06-11

    ...; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense Acquisition Regulations System... and relocate the requirements for conducting a Contractor Insurance/Pension Review from Procedures... requirements for Contractor Insurance/Pension Review (CIPR) from DFARS 242.7302 to Procedures, Guidance, and...

  13. 42 CFR 405.1010 - When CMS or its contractors may participate in an ALJ hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may participate in an... Hearings § 405.1010 When CMS or its contractors may participate in an ALJ hearing. (a) An ALJ may request, but may not require, CMS and/or one or more of its contractors to participate in any...

  14. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by...

  15. 2006 Fundamental Research Underlying Solid-State Lighting: Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kini, Arvind [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kelley, Dick [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-02-01

    This volume highlights the scientific content of the 2006 Fundamental Research Underlying Solid-State Lighting Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) in the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). This meeting is the second in a series of research theme-based Contractors Meetings and will focus on BES/DMS&E-funded research that underpins solid-state lighting technology. The meeting will feature research that cuts across several DMS&E core research program areas. The major programmatic emphasis is on developing a fundamental scientific base, in terms of new concepts and new materials that could be used or mimicked in designing novel materials, processes or devices.

  16. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key......Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... Construction is viewed as a management concept and the journey into the construction company witness not only that top management is very little involved, but also that the concept is negotiated and promoted by a number of actors and coalitions competing for attention and resources with a number of other...

  17. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...... actors/brokers and coalitions. Lean Construction is shaped in the process of emergence in the organisation, where also explicit corporate strategies and other initiatives of the organization interact with the concept and the actors and coalitions surrounding it. It is analysed how Lean Construction...

  18. Between Fit and Misfit – Small Contractors Using Mobile Technology

    DEFF Research Database (Denmark)

    Koch, Christian; Tambo, Torben; Buser, Martine

    2010-01-01

    This paper analyzes the use of information systems with mobile computing elements in small contractors. Statistical material on ICT-developments in construction reveals a quite scattered and patterned picture of coexistence of generic and dedicated systems and considerable lagging behind other...... sectors. A literature review understands mobility in three parts, micro, local and remote mobility underpinning a theoretical fit between construction processes and mobile technology. The construction information systems with a mobile element encompasses a communication technology and the mobile element...... spanning between various location and mobilities on site, the site management office, one or more headquarters of construction firms and the mobile space of in between these multiple locations. The qualitative empirical study cover three constellations of small general and craft contractors, their mobile...

  19. Summary of the technical review of the safety analysis reports for packaging (SARP) for the transnuclear transport/storage casks: TN-BRP and TN-REG

    Energy Technology Data Exchange (ETDEWEB)

    1986-07-01

    The Safety Analysis Reports for Packaging for two spent fuel shipping casks were technically reviewed by the Oak Ridge National Laboratory. The casks were designed by Transnuclear, Inc., for shipment of 85 Big Rock Point boiling water reactor fuel elements and 40 R.E. Ginna pressurized water reactor fuel elements from West Valley, New York, to Idaho Falls, Idaho. The intent of the review was to ensure compliance of the casks with the requirements the applicable Federal Regulations contained in 10 CFR Pt. 71 and allow issuance of Department of Energy Certificates of Compliance for transport by the Department of Energy Idaho Operations Office. The review was performed by a team of Oak Ridge National Laboratory staff assembled for their expertise in criticality analysis, shielding, metallurgy, nondestructive testing, thermal analysis, structural analysis, and containment. This report describes the review processes, the findings in each technical area, and the overall conclusion that a Certificate of Compliance could be issued for the proposed single shipment under the specified conditions and constraints.

  20. CORROSION OF ALUMINUM CLAD SPENT NUCLEAR FUEL IN THE 70 TON CASK DURING TRANSFER FROM L AREA TO H-CANYON

    Energy Technology Data Exchange (ETDEWEB)

    Mickalonis, J.

    2014-06-01

    Aluminum-clad spent nuclear fuel will be transported for processing in the 70-ton nuclear fuel element cask from L Basin to H-canyon. During transport these fuels would be expected to experience high temperature aqueous corrosion from the residual L Basin water that will be present in the cask. Cladding corrosion losses during transport were calculated for material test reactor (MTR) and high flux isotope reactors (HFIR) fuels using literature and site information on aqueous corrosion at a range of time/temperature conditions. Calculations of the cladding corrosion loss were based on Arrhenius relationships developed for aluminum alloys typical of cladding material with the primary assumption that an adherent passive film does not form to retard the initial corrosion rate. For MTR fuels a cladding thickness loss of 33 % was found after 1 year in the cask with a maximum temperature of 260 {degrees}C. HFIR fuels showed a thickness loss of only 6% after 1 year at a maximum temperature of 180 {degrees}C. These losses are not expected to impact the overall confinement function of the aluminum cladding.

  1. Corrosion of aluminum clad spent nuclear fuel in the 70 ton cask during transfer from L area to H-canyon

    Energy Technology Data Exchange (ETDEWEB)

    Mickalonis, J. I. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-08-01

    Aluminum-clad spent nuclear fuel will be transported for processing in the 70-ton nuclear fuel element cask from L Basin to H-canyon. During transport these fuels would be expected to experience high temperature aqueous corrosion from the residual L Basin water that will be present in the cask. Cladding corrosion losses during transport were calculated for material test reactor (MTR) and high flux isotope reactors (HFIR) fuels using literature and site information on aqueous corrosion at a range of time/temperature conditions. Calculations of the cladding corrosion loss were based on Arrhenius relationships developed for aluminum alloys typical of cladding material with the primary assumption that an adherent passive film does not form to retard the initial corrosion rate. For MTR fuels a cladding thickness loss of 33% was found after 1 year in the cask with a maximum temperature of 263 °C. HFIR fuels showed a thickness loss of only 6% after 1 year at a maximum temperature of 180 °C. These losses are not expected to impact the overall confinement function of the aluminum cladding.

  2. Corrosion of aluminum clad spent nuclear fuel in the 70 ton cask during transfer from L area to H-canyon

    Energy Technology Data Exchange (ETDEWEB)

    Mickalonis, J. I. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-08-31

    Aluminum-clad spent nuclear fuel will be transported for processing in the 70-ton nuclear fuel element cask from L Basin to H-canyon. During transport these fuels would be expected to experience high temperature aqueous corrosion from the residual L Basin water that will be present in the cask. Cladding corrosion losses during transport were calculated for material test reactor (MTR) and high flux isotope reactors (HFIR) fuels using literature and site information on aqueous corrosion at a range of time/temperature conditions. Calculations of the cladding corrosion loss were based on Arrhenius relationships developed for aluminum alloys typical of cladding material with the primary assumption that an adherent passive film does not form to retard the initial corrosion rate. For MTR fuels a cladding thickness loss of 33 % was found after 1 year in the cask with a maximum temperature of 263 °C. HFIR fuels showed a thickness loss of only 6% after 1 year at a maximum temperature of 180 °C. These losses are not expected to impact the overall confinement function of the aluminum cladding.

  3. Forest machine contractors in Swedish industrial forestry: Significance and conditions during 1986-1993. Doctoral thesis

    Energy Technology Data Exchange (ETDEWEB)

    Liden, E.

    1995-07-01

    The aim of this review was to come to a general understanding of the phenomenon of contracting in forestry as an occupation and a life-style. This has been accomplished by studies on machine ownership, working conditions, and attrition from forestry, using quantitative methods in combination with qualitative ones, during the period 1986 to 1993. The studies pertained to industrial forestry in Sweden. In 1992/93 70% of all machines used in industrial forestry in Sweden were owned by contractors. Together these machines harvested 59% of the total quantity during the 1992/93 harvesting season. Three categories of contractors were recognized; the single contractor, the partner contractor, and the contractor with employees. It was concluded that being a contractor is more a life-style than an occupation. Very often the whole family is involved in the business. The contractors` willingness to work hard and to do a good job is an asset for forestry.

  4. Controls Over the Contractor Common Access Card Life Cycle

    Science.gov (United States)

    2008-10-10

    Identification System SES Senior Executive Service SPOC Service Point of Contact TASM Trusted Agent Security Manager USD (AT&L) Under...the final report by October 31, 2008. 53 Finding D. Oversight of Common Access Card Sponsors DoD CVS Service Points of Contact ( SPOCs ...authorization to approve contractor CACs. Organization of CAC Application Sites Each Service agency has an SPOC who is responsible for coordinating with

  5. 48 CFR 252.204-7010 - Requirement for Contractor to Notify DoD if the Contractor's Activities are Subject to Reporting...

    Science.gov (United States)

    2010-10-01

    ...— (i) Notify the Contractor that DoD officials intend to conduct an assessment of vulnerabilities to..., conduct the assessment in a manner that does not impede or delay operations at the Contractor's facility... assessment of vulnerabilities to IAEA inspections or visits. (d) Following a security assessment of the...

  6. Perceptions of Contractors and Consultants Toward Application of Greenship Rating Tools on Apartment Buildings in Surabaya

    Directory of Open Access Journals (Sweden)

    Herry Pintardi Chandra

    2014-04-01

    Full Text Available During the last ten years, the growth of apartment buildings in Surabaya has encountered the bitter experience of global warming, resource depletion, energy scarcity, and other environmental impacts. We cannot avoid them, but we can minimize the negative impacts of global warming. The green building concept is one of the methods to minimize the environmental impact. It takes into account principles of sustainable development in planning, construction, operation, and maintenance. Greenship Rating Tools is used to evaluate and calculate green achievements, prior to green building certification. The aim of this research is to represent the perceptions of contractors and consultants toward application of Greenship Rating Tools on apartment buildings in Surabaya. Based on the data obtained from a questionnaires survey carried out to 41 respondents, the mean value ranking method is used to evaluate the main factors of Greenship. These factors are Appropriate Site Development, Energy Efficiency and Conservation, Water Conservation, Material Resource and Cycle, Indoor Health and Comfort, and Building Environmental Management. In general, the results of this research show that there are a number of differences between perceptions of contractors and consultants toward application of Greenship Rating Tools on apartment buildings in Surabaya. According to the contractors’ perception, Visual Comfort is a factor that would easily to be applied, whilst consultants’ is Landscape. On the other hand, there are factors that would difficult to be applied. Based on contractors’ perceptiom is Climate Change, while consultants’ perception is Renewal Energy. In summary, Greenship Rating Tools can be applied on contractors’ and consultants’ perceptions, whilst there are some variables which can not be applied.

  7. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  8. Hand in Glove? Small Building Contractors, Mobile Technology and Innovation

    DEFF Research Database (Denmark)

    Buser, Martine; Koch, Christian; Tambo, Torben

    2010-01-01

    for construction are developing as well. A recent review shows a small portfolio of systems using mobile computing to support specifically the construction project processes. The aim of this paper is to evaluate the use of mobile computing at small construction contractors. The paper presents a quantitative...... evaluative study of both SME use of ICT related to construction sites and experiences with the implementation and use of three ICT systems based on the use of Personalized Digital Assistants (PDA's) supporting various work processes such as hours spent registration, planning and in-process quality assurance...

  9. US Military Logistics Management, Privatization, and Contractors on the Battlefield. What Does This All Mean?

    Science.gov (United States)

    2002-01-01

    MILITARY LOGISTICS MANAGEMENT, PRIVATIZATION, AND CONTRACTORS ON THE BATTLEFIELD. WHAT DOES THIS ALL MEAN? BY LIEUTENANT COLONEL DAVE McKENNA United States...PA 17013-5050 L020 USAWC STRATEGY RESEARCH PROJECT US MILITARY LOGISTICS MANAGEMENT, PRIVATIZATION, AND CONTRACTORS ON THE BATTLEFIELD. WHAT DOES THIS...ABSTRACT AUTHOR: LTC Dave McKenna TITLE: US Military Logistics Management, Privatization, and Contractors on the Battlefield. What Does This All Mean

  10. SCALE/MAVRIC calculation of dose rates measured for a gamma radiation source in a thick-walled transport and storage cask of ductile cast iron with lead inserts

    Science.gov (United States)

    Baumgarten, Werner; Thiele, Holger; Ruprecht, Benjamin; Phlippen, Peter-W.; Schlömer, Luc

    2017-09-01

    Dose rate calculations are important for judging the shielding performance of transport casks for radioactive material. Therefore it is important to have reliable calculation tools. We report on measured and calculated dose rates near a thick-walled transport and storage cask of ductile cast iron with lead inserts and a Co-60 source inside. In a series of experiments the thickness of the inserts was varied, and measured dose rates near the cask were compared with SCALE/MAVRIC 6.1.3 and SCALE/MAVRIC 6.2 calculation results. Deviations from the measurements were found to be higher for increased lead thicknesses. Furthermore, it is shown how the shielding material density, air scattering and accounting for the floor influence the quality of the calculation.

  11. 48 CFR 2110.7002 - Contractor investment of FEGLI Program funds.

    Science.gov (United States)

    2010-10-01

    ... PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION ACQUISITION... constraints of safety and liquidity of investments, the Contractor must seek to maximize investment income...

  12. 29 CFR 500.71 - Utilization of only registered farm labor contractors.

    Science.gov (United States)

    2010-07-01

    ... OF LABOR REGULATIONS MIGRANT AND SEASONAL AGRICULTURAL WORKER PROTECTION Worker Protections General... utilizing the services of a farm labor contractor to supply migrant or seasonal agricultural workers...

  13. Implementation and implication of total quality management on client- contractor relationship in residential projects

    Science.gov (United States)

    Murali, Swetha; Ponmalar, V.

    2017-07-01

    To make innovation and continuous improvement as a norm, some traditional practices must become unlearnt. Change for growth and competitiveness are required for sustainability for any profitable business such as the construction industry. The leading companies are willing to implement Total Quality Management (TQM) principles, to realise potential advantages and improve growth and efficiency. Ironically, researches recollected quality as the most significant provider for competitive advantage in industrial leadership. The two objectives of this paper are 1) Identify TQM effectiveness in residential projects and 2) Identify the client satisfaction/dissatisfaction areas using Analytical Hierarchy Process (AHP) and suggest effective mitigate measures. Using statistical survey techniques like set of questionnaire survey, it is observed that total quality management was applied in some leading successful organization to an extent. The main attributes for quality achievement can be defined as teamwork and better communication with single agreed goal between client and contractor. Onsite safety is a paramount attribute in the identifying quality within the residential projects. It was noticed that the process based quality methods such as onsite safe working condition; safe management system and modern engineering process safety controls etc. as interlinked functions. Training and effective communication with all stakeholders on quality management principles is essential for effective quality work. Late Only through effective TQM principles companies can avoid some contract litigations with an increased client satisfaction Index.

  14. Study and full-scale test of a high-velocity grade-crossing simulated accident of a locomotive and a nuclear-spent-fuel shipping cask

    Energy Technology Data Exchange (ETDEWEB)

    Huerta, M.; Yoshimura, H.R.

    1983-02-01

    This report described structural analyses of a high-speed impact between a locomotive and a tractor-trailer system carrying a nuclear-spent-fuel shipping cask. The analyses included both mathematical and physical scale-modeling of the system. The report then describes the full-scale test conducted as part of the program. The system response is described in detail, and a comparison is made between the analyses and the actual hardware response as observed in the full-scale test. 34 figures.

  15. Determination of uncertainties in the calculation of dose rates at transport and storage casks; Unsicherheiten bei der Berechnung von Dosisleistungen an Transport- und Lagerbehaeltern

    Energy Technology Data Exchange (ETDEWEB)

    Schloemer, Luc Laurent Alexander

    2014-12-17

    The compliance with the dose rate limits for transport and storage casks (TLB) for spent nuclear fuel from pressurised water reactors can be proved by calculation. This includes the determination of the radioactive sources and the shielding-capability of the cask. In this thesis the entire computational chain, which extends from the determination of the source terms to the final Monte-Carlo-transport-calculation is analysed and the arising uncertainties are quantified not only by benchmarks but also by variational calculi. The background of these analyses is that the comparison with measured dose rates at different TLBs shows an overestimation by the values calculated. Regarding the studies performed, the overestimation can be mainly explained by the detector characteristics for the measurement of the neutron dose rate and additionally in case of the gamma dose rates by the energy group structure, which the calculation is based on. It turns out that the consideration of the uncertainties occurring along the computational chain can lead to even greater overestimation. Concerning the dose rate calculation at cask loadings with spent uranium fuel assemblies an uncertainty of (({sup +21}{sub -28}) ±2) % (rel.) for the total gamma dose rate and of ({sup +28±23}{sub -55±4}) % (rel.) for the total neutron dose rate are estimated. For mixed-loadings with spent uranium and MOX fuel assemblies an uncertainty of ({sup +24±3}{sub -27±2}) % (rel.) for the total gamma dose rate and of ({sup +28±23}{sub -55±4}) % (rel.) for the total neutron dose rate are quantified. The results show that the computational chain has not to be modified, because the calculations performed lead to conservative dose rate predictions, even if high uncertainties at neutron dose rate measurements arise. Thus at first the uncertainties of the neutron dose rate measurement have to be decreased to enable a reduction of the overestimation of the calculated dose rate afterwards. In the present thesis

  16. Validation Experiments for Spent- Fuel Dry-Cask In-Basket Convection

    Energy Technology Data Exchange (ETDEWEB)

    Smith, barton [Utah State Univ., Logan, UT (United States)

    2016-08-16

    This work consisted of the following major efforts; 1. Literature survey on validation of external natural convection; 2. Design the experiment; 3. Build the experiment; 4. Run the experiment; 5. Collect results; 6. Disseminate results; and 7. Perform a CFD validation study using the results. We note that while all tasks are complete, some deviations from the original plan were made. Specifically, geometrical changes in the parameter space were skipped in favor of flow condition changes, which were found to be much more practical to implement. Changing the geometry required new as-built measurements, which proved extremely costly and impractical given the time and funds available

  17. Validation Experiments for Spent-Fuel Dry-Cask In-Basket Convection

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Barton L. [Utah State Univ., Logan, UT (United States). Dept. of Mechanical and Aerospace Engineering

    2016-08-16

    This work consisted of the following major efforts; 1. Literature survey on validation of external natural convection; 2. Design the experiment; 3. Build the experiment; 4. Run the experiment; 5. Collect results; 6. Disseminate results; and 7. Perform a CFD validation study using the results. We note that while all tasks are complete, some deviations from the original plan were made. Specifically, geometrical changes in the parameter space were skipped in favor of flow condition changes, which were found to be much more practical to implement. Changing the geometry required new as-built measurements, which proved extremely costly and impractical given the time and funds available

  18. 48 CFR 52.203-13 - Contractor Code of Business Ethics and Conduct.

    Science.gov (United States)

    2010-10-01

    ... Business Ethics and Conduct. 52.203-13 Section 52.203-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.203-13 Contractor Code of Business Ethics and Conduct. As prescribed in 3.1004(a), insert the following clause: Contractor Code of Business Ethics and Conduct (APR 2010) (a) Definitions...

  19. 48 CFR 45.606-1 - Contractor with an approved scrap procedure.

    Science.gov (United States)

    2010-10-01

    ... approved scrap procedure. 45.606-1 Section 45.606-1 Federal Acquisition Regulations System FEDERAL... Contractor with an approved scrap procedure. (a) The contractor may dispose of scrap resulting from production or testing under this contract without Government approval. However, if the scrap...

  20. Key aspects in managing safety when working with multiple contractors: A case study

    NARCIS (Netherlands)

    Drupsteen, L.; Rasmussen, H.B.; Ustailieva, E.; Kampen, J. van

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues

  1. 37 CFR 401.10 - Government assignment to contractor of rights in invention of government employee.

    Science.gov (United States)

    2010-07-01

    ... contractor of rights in invention of government employee. 401.10 Section 401.10 Patents, Trademarks, and Copyrights ASSISTANT SECRETARY FOR TECHNOLOGY POLICY, DEPARTMENT OF COMMERCE RIGHTS TO INVENTIONS MADE BY... AGREEMENTS § 401.10 Government assignment to contractor of rights in invention of government employee. In any...

  2. 77 FR 50449 - Revision of Department of Homeland Security Acquisition Regulation; Contractor Billing and...

    Science.gov (United States)

    2012-08-21

    ... from the Fair Labor Standards Act (FLSA). Contractors with a T&M/LH contract would be required to... hour workweek) by a contractor employee who is exempt from the Fair Labor Standards Act (FLSA... exempt from the Fair Labor Standards Act (FLSA) under the contract or order, including overtime. The...

  3. 5 CFR 792.212 - What is the definition of a child care contractor?

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false What is the definition of a child care contractor? 792.212 Section 792.212 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL... Legislation and to Whom Does It Apply? § 792.212 What is the definition of a child care contractor? Section...

  4. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's privileged financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System... 1845.7101-5 Contractor's privileged financial and business information. If a transfer of...

  5. 48 CFR 252.227-7038 - Patent Rights-Ownership by the Contractor (Large Business).

    Science.gov (United States)

    2010-10-01

    ... paragraph (c) of this clause and the agency requests title within 60 days after learning of the Contractor's..., the subject invention throughout the world. (e) Contractor action to protect the Government's interest...) Serial number and title. (iii) A copy of any patent application (including an English-language version if...

  6. 48 CFR 52.223-18 - Contractor Policy to Ban Text Messaging While Driving.

    Science.gov (United States)

    2010-10-01

    ... Text Messaging While Driving. 52.223-18 Section 52.223-18 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.223-18 Contractor Policy to Ban Text Messaging While Driving. As prescribed in 23.1105, insert the following clause: CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE...

  7. 31 CFR 1.30 - Application to system of records maintained by Government contractors.

    Science.gov (United States)

    2010-07-01

    ... by Government contractors. When a component contracts for the operation of a system of records, to... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Application to system of records maintained by Government contractors. 1.30 Section 1.30 Money and Finance: Treasury Office of the...

  8. Ensuring Operational Readiness: Private Military Contractor Support for the United States Air Force

    Science.gov (United States)

    2017-03-15

    Ensuring Operational Readiness: Private Military Contractor Support for the United States Air Force A Monograph by Maj Stephen P. Joca United...States Air Force School of Advanced Military Studies United States Army Command and General Staff College Fort Leavenworth, Kansas 2017 Approved...Operational Readiness: Private Military Contractor Support for the United States Air Force Approved by: __________________________________, Monograph

  9. 10 CFR 1004.3 - Public reading facilities and policy on contractor records.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Public reading facilities and policy on contractor records... Public reading facilities and policy on contractor records. (a) The DOE Headquarters will maintain, in the public reading facilities, the materials which are required by 5 U.S.C. 552(a)(2) to be...

  10. 48 CFR 52.237-6 - Incremental Payment by Contractor to Government.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Incremental Payment by... Provisions and Clauses 52.237-6 Incremental Payment by Contractor to Government. As prescribed in 37.304(c... to the contractor for increments of property, only upon receipt of those payments: Incremental...

  11. Construction Management and Local Contractors--A Good Team for the Owner.

    Science.gov (United States)

    Kluenker, Charles

    1987-01-01

    Using local contractors for construction work benefits the community by keeping money in the area and reducing the cost of imported management and labor. To accomplish this, the construction management firm must have the commitment to working with the local contractors throughout the entire design, bidding, and construction period. (MLF)

  12. 7 CFR 1788.11 - Minimum insurance requirements for contractors, engineers, and architects.

    Science.gov (United States)

    2010-01-01

    ..., engineers, and architects. 1788.11 Section 1788.11 Agriculture Regulations of the Department of Agriculture... REQUIREMENTS FOR ELECTRIC AND TELECOMMUNICATIONS BORROWERS Insurance for Contractors, Engineers, and Architects, Electric Borrowers § 1788.11 Minimum insurance requirements for contractors, engineers, and architects....

  13. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense Acquisition.../Pension Review from Procedures, Guidance, and Information (PGI) to the Defense Federal Acquisition... requirements for Contractor Insurance/ Pension Review to DFARS 242.7302 from PGI 242.7302. DoD published a...

  14. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Science.gov (United States)

    2010-12-30

    ... respondents stated that they have concerns over what happens when a contractor claims to have lost an identity... Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY: Department...) were in place and worked as intended. A ``CAC'' is the DoD term for a Personal Identity...

  15. 48 CFR 1313.302-3 - Obtaining contractor acceptance and modifying purchase orders.

    Science.gov (United States)

    2010-10-01

    ... acceptance and modifying purchase orders. 1313.302-3 Section 1313.302-3 Federal Acquisition Regulations... Simplified Acquisitions Methods 1313.302-3 Obtaining contractor acceptance and modifying purchase orders. A contractor's written acceptance of a purchase order modification is required, unless the contracting...

  16. 48 CFR 13.302-3 - Obtaining contractor acceptance and modifying purchase orders.

    Science.gov (United States)

    2010-10-01

    ... acceptance and modifying purchase orders. 13.302-3 Section 13.302-3 Federal Acquisition Regulations System... Simplified Acquisition Methods 13.302-3 Obtaining contractor acceptance and modifying purchase orders. (a... order by the contractor. (b) Each purchase order modification shall identify the order it modifies...

  17. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Science.gov (United States)

    2013-01-22

    ... establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD-92330-A to convey actual construction costs in a standardized format... use: Contractors use the form HUD-2328 to establish a schedule of values of construction items...

  18. a factorial study of contrac ial study of contractor sel ial study of ...

    African Journals Online (AJOL)

    eobe

    Keywords: contractors, factor loading, varimax rota. 1. ... Our findings showed that the key selection selection uration of work ... Overall, this study has been successful in providin. Overall, this ... suitable contractor for a construction project is a ... across variables) and ..... Multi- Criteria Analysis of Dwelling Life Cycle. Statyba.

  19. 48 CFR 945.102-70 - Reporting of contractor-held property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Reporting of contractor-held property. 945.102-70 Section 945.102-70 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 945.102-70 Reporting of contractor-held...

  20. 48 CFR 852.236-72 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ..., mechanics, and foremen/forewomen on the contractor's payroll and under his/her direct supervision shall be... equipment installed by such labor may be included. The work by the contractor's executive, supervisory and... Construction Contracts clause of the contract, a statement designating the branch or branches of contract...

  1. 29 CFR 779.233 - Independent contractors performing work “for” an enterprise.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Independent contractors performing work âforâ an enterprise... Apply; Enterprise Coverage Leased Departments, Franchise and Other Business Arrangements § 779.233 Independent contractors performing work “for” an enterprise. (a) The definition in section 3(r) specifically...

  2. Key aspects in managing safety when working with multiple contractors: A case study

    NARCIS (Netherlands)

    Drupsteen, L.; Rasmussen, H.B.; Ustailieva, E.; Kampen, J. van

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues a

  3. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2011-03-02

    ... outside of the Government; (D) That a breach of that contract by the covered Government support contractor... support contractor to execute a non- disclosure agreement having certain restrictions and remedies... to execute a non-disclosure agreement having certain restrictions and remedies. The DFARS scheme...

  4. 49 CFR 26.13 - What assurances must recipients and contractors make?

    Science.gov (United States)

    2010-10-01

    ... Remedies Act of 1986 (31 U.S.C. 3801 et seq.). (b) Each contract you sign with a contractor (and each... contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate....

  5. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Multimedia

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. Others activities will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will not change and will be opera...

  6. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Multimedia

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. The remaining activities (including cleaning) will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will ...

  7. Between Fit and Misfit – Small Contractors Using Mobile Technology

    DEFF Research Database (Denmark)

    Koch, Christian; Tambo, Torben; Buser, Martine

    2010-01-01

    sectors. A literature review understands mobility in three parts, micro, local and remote mobility underpinning a theoretical fit between construction processes and mobile technology. The construction information systems with a mobile element encompasses a communication technology and the mobile element...... technology use and their IT-suppliers. The cases demonstrate a fit with the dedicated mobile technology, spanning all the types of mobility. The work rhythm and placement of the mobile technology with the craftsmen‟s work procedures seems to be a proper fit. Moreover, designing a system to the craftsmen......This paper analyzes the use of information systems with mobile computing elements in small contractors. Statistical material on ICT-developments in construction reveals a quite scattered and patterned picture of coexistence of generic and dedicated systems and considerable lagging behind other...

  8. NASA scientific and technical program: User survey

    Science.gov (United States)

    Hunter, Judy F.; Shockley, Cynthia W.

    1993-01-01

    Results are presented of an intensive user requirements survey conducted by NASA's Scientific and Technical Information (STI) Program with the goal of improving the foundation for the user outreach program. The survey was carried out by interviewing 550 NASA scientists, engineers, and contractors and by analyzing 650 individual responses to a mailed out questionnaire. To analyze the user demographic data, a data base was built and used, and will be applied to ongoing analysis by the NASA STI Program.

  9. NASA Scientific and Technical Program - User survey

    Science.gov (United States)

    Hunter, Judy F.; Shockley, Cynthia W.

    1993-01-01

    Results are presented of an intensive user requirements survey conducted by NASA's Scientific and Technical Information (STI) Program with the goal of improving the foundation for the user outreach program. The survey was carried out by interviewing 550 NASA scientists, engineers, and contractors and by analyzing 650 individual responses to a mailed out questionnaire. To analyze the user demographic data, a data base was built and used, and will be applied to ongoing analysis by the NASA STI Program.

  10. 9 CFR 201.94 - Information as to business; furnishing of by packers, swine contractors, live poultry dealers...

    Science.gov (United States)

    2010-01-01

    ... of by packers, swine contractors, live poultry dealers, stockyard owners, market agencies, and... poultry dealers, stockyard owners, market agencies, and dealers. Each packer, swine contractor, live poultry dealer, stockyard owner, market agency, and dealer, upon proper request, shall give to...

  11. Study of the temperature distribution on welded thin plates of duplex steel to be used for the external clad of a cask for transportation of radiopharmaceuticals products

    Energy Technology Data Exchange (ETDEWEB)

    Betini, Evandro G.; Ceoni, Francisco C.; Mucsi, Cristiano S.; Politano, Rodolfo; Rossi, Jesualdo L., E-mail: egbetini@ipen.br, E-mail: fceoni@hotmail.com, E-mail: csmucsi@ipen.br, E-mail: politano@ipen.br, E-mail: jelrossi@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil); Orlando, Marcos T.D., E-mail: mtdorlando@gmail.com [Universidade Federal do Espirito Santo (CCE/DFIS/UFES), Vitoria, ES (Brazil). Centro de Ciencias Exatas. Departamento de Fisica

    2015-07-01

    The clad material for a proprietary transport device for radiopharmaceutical products is the main focus of the present work. The production of {sup 99}Mo-{sup 99m}Tc transport cask requires a receptacle or cask where the UNS S32304 duplex steel sheet has shown that it meets high demands as the required mechanical strength and the spread of impact or shock waves mitigation. This work reports the experimental efforts in recording the thermal distribution on autogenous thin plates of UNS S32304 steel during welding. The UNS S32304 duplex steel is the most probable candidate for the external clad of the containment package for the transport of radioactive substances so it is highly relevant the understanding of all its physical parameters and its behavior under the thermal cycle imposed by a welding process. For the welding of the UNS S32304 autogenous plates the GTAW (gas tungsten arc welding) process was used with a pure argon arc protection atmosphere in order to simulate a butt joint weld on a thin duplex steel plate without filler metal. The thermal cycles were recorded by means of K-type thermocouples embedded by electrical spot welding near the weld region and connected to a multi-channel data acquisition system. The obtained results validate the reliability of the experimental apparatus for the future complete analysis of the welding experiment and further comparison to numerical analysis. (author)

  12. Critical Factors Inhibiting Performance of Small- and Medium-Scale Contractors in Sub-Saharan Region: A Case for Malawi

    Directory of Open Access Journals (Sweden)

    Paul John Kulemeka

    2015-01-01

    Full Text Available The construction industry is dominated by small- and medium-scale contractors (SMCs who face an emerging trend of unique challenges in the implementation of projects. The study was aimed at examining inhibiting factors that influence performance of SMCs in terms of “quality of work,” “tender estimation,” “tender preparation,” and “timely completion of construction projects” in Malawi. A survey questionnaire was administered to 370 players in the construction industry which included public sector clients, contractors, consultants, and construction resource trainers in order to elicit data from 118 variables that were identified through a careful literature review. The inhibiting factors were generally dominated by economic issues, which was an emerging trend to what has been previously reported in the sub-Saharan region. The first highest ranked inhibiting factors were high lending interest regimes offered by financial institutions; stringent conditions to access capital; fluctuation of currency; stringent requirements for obtaining bonds; and high taxes. The research lays the foundation for further understanding of inhibitors on performance of SMCs in an evolving world which is being impacted by global factors and punctuated by sudden changes.

  13. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  14. 42 CFR 405.1012 - When CMS or its contractors may be a party to a hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may be a party to a... Hearings § 405.1012 When CMS or its contractors may be a party to a hearing. (a) CMS and/or one or more of... unrepresented beneficiary. (b) CMS and/or the contractor(s) advises the ALJ, appellant, and all other...

  15. 48 CFR 603.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 603.104-4... contractor bid or proposal information and source selection information. (a) The following classes of persons may be authorized to receive contractor bid or proposal information or source selection information...

  16. 48 CFR 1403.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 1403.104-4... marking of contractor bid or proposal information and source selection information. (a) The following classes of persons may be authorized access to contractor bid or proposal information and source...

  17. 48 CFR 1303.104-4 - Disclosure, protection and marking of contractor bid or proposal information and source selection...

    Science.gov (United States)

    2010-10-01

    ... marking of contractor bid or proposal information and source selection information. 1303.104-4 Section... contractor bid or proposal information and source selection information. Contractor bid or proposal information and source selection information must be protected from unauthorized disclosure in accordance...

  18. Management of Interface between Main Contractor and Subcontractors for Successful Project Outcomes

    Directory of Open Access Journals (Sweden)

    Harry White

    2014-01-01

    Full Text Available There has been increased dependence on subcontracting within the construction industry, the operational relationship between the Main Contractor (MC and Subcontractor (SC plays a significant role in successful delivery of projects. Through the literature review this paper argues that despite SCs bring added value to construction projects, the increased reliance on SCs has strained relationships between the MC and SC. Also MCs are more concerned with risk and price reduction which undermine the relationship heavily. Current practices in the construction industry in managing SCs were evaluated through a case study and semi-structured interviews. A questionnaire survey was used to investigate the ways of facilitating the interface between the MC and SC in general. The study highlighted that prevailing adverse relationships and culture in the industry are influencing the success of construction projects. The lack of trust is a key factor affecting the relationships between MC and SCs. However, the proactive involvement of the MC with SCs in maintaining continuity of the team from procurement to construction stage and transparency in the processes were key success factors for successful completion of the project.

  19. ASSESSING THE IMPACT OF TOTAL QUALITY MANAGEMENT PRACTICES AND QUALITY CULTURE WITH COMPETITIVENESS OF SAUDI CONTRACTORS

    Directory of Open Access Journals (Sweden)

    Faihan Alotaibi

    2013-01-01

    Full Text Available Total quality management practices in construction industries can be described as the processes or that aligns the business performance strategy to the business processes in the hopes of achieving customer satisfaction and product and services quality. Quality culture conditions are strongly linked with project outcomes and hence, initiatives undertaken should be incorporated to the organizational cultural changes. The aim of the study is to determine the impact of total quality management practices, quality culture and their relationship with the competitiveness of Saudi Arabia contractors. A quantitative research design was adopted to collect data and test hypotheses. A cross-sectional survey method was used to conduct this study. The findings of the study will contribute to both theory and practice. Through the present study, the researcher expects the findings to indicate that total quality management practices meaningfully contributed and related to competitiveness and developing cooperative relationship with customers; practices that are related to the achievement of continuous improvement and in turn, continuous improvement affects quality outcomes.

  20. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  1. "CONFIRMATORY SURVEY RESULTS FOR THE ABB COMBUSTION ENGINEERING SITE WINDSOR, CONNECTICUT DCN 5158-SR-02-2

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, WADE C

    2013-03-25

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.

  2. Health and Safety Guide for Home Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Stratton, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Walker, Iain S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-02-15

    This report is intended to provide home performance contractor trainers with a resource to keep both their workers and home residents safe and healthy. This document is an attempt to describe what we currently believe is safe, what we believe is unsafe, and what we’re unsure about. It is intended to identify health and safety issues and provide historical context and current understanding of both risks and mitigation strategies. In addition, it provides links to more in-depth resources for each issue. When we tighten the thermal envelope of a house to improve comfort and reduce energy use, we have to be sure that we are not compromising the indoor air quality of the home. This means identifying and mitigating or eliminating pollution sources before and after you make changes to the home. These sources can include materials and finishes in the home, exhaust gasses from combustion appliances, soil gasses such as radon, and moisture from a bathroom, kitchen, or unvented clothes dryer. Our first responsibility is to do no harm — this applies both to our clients and to our employees. Currently, there are many new products that are widely used but whose health effects are not well understood. Our in ability to have perfect information means the directive to do no harm can be difficult to obey. Each home is a little bit different, and in the face of a situation you’ve never encountered, it’s important to have a solid grasp of the fundamental concepts of building science when the hard and fast rules don’t apply . The home performance industry is gaining momentum, and has the potential to expand greatly as energy costs continue to rise. It is imperative that we remain vigilant about protecting the health and safety of our workers and our customers. It only takes a few news stories about a family that got sick after their home was tightened by a home performance contractor to scare off potential customers and taint the reputation of the entire industry. Good

  3. Managing aging effects on dry cask storage systems for extended long-term storage and transportation of used fuel - rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    Chopra, O.K.; Diercks, D.; Fabian, R.; Ma, D.; Shah, V.; Tam, S.W.; Liu, Y. (Decision and Information Sciences); ( EVS); ( NE)

    2012-07-06

    The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that

  4. Managing aging effects on dry cask storage systems for extended long-term storage and transportation of used fuel - rev. 0

    Energy Technology Data Exchange (ETDEWEB)

    Chopra, O.K.; Diercks, D.; Fabian, R.; Ma, D.; Shah, V.; Tam, S.W.; Liu, Y. (Decision and Information Sciences); ( EVS); ( NE)

    2012-07-06

    The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that

  5. Cruise ship's doctors - company employees or independent contractors?

    Science.gov (United States)

    Dahl, Eilif

    2016-01-01

    Traditionally, cruise companies have stated that they are in the transport business but not in the business of providing medical services to passengers. They have claimed not to be able to supervise or control the ship's medical personnel and cruise ship's doctors have therefore mostly been signed on as independent contractors, not employees. A United States court decision from 1988, Barbetta versus S/S Bermuda Star, supported this view and ruled that a ship's owner cannot be held vicariously liable for the negligence of the ship's doctor directed at the ship's passengers. Some years ago a cruise passenger fell and hit his head while boarding a trolley ashore. Hours later he was seen aboard by the ship's doctor, who sent him to a local hospital. He died 1 week later, and his daughter filed a complaint alleging the cruise company was vicariously liable for the purported negligence of the ship's doctor and nurse, under actual or apparent agency theories. A United States district court initially dismissed the case, but in November 2014 the United States Court of Appeals for the Eleventh Circuit disagreed and reversed. From then on independently contracted ship's doctors may be considered de facto employees of the cruise line. The author discusses the employment status of physicians working on cruise ships and reviews arguments for and against the Appellate Court's decision.

  6. Nuclear criticality safety training: guidelines for DOE contractors

    Energy Technology Data Exchange (ETDEWEB)

    Crowell, M.R.

    1983-09-01

    The DOE Order 5480.1A, Chapter V, Safety of Nuclear Facilities, establishes safety procedures and requirements for DOE nuclear facilities. This guide has been developed as an aid to implementing the Chapter V requirements pertaining to nuclear criticality safety training. The guide outlines relevant conceptual knowledge and demonstrated good practices in job performance. It addresses training program operations requirements in the areas of employee evaluations, employee training records, training program evaluations, and training program records. It also suggests appropriate feedback mechanisms for criticality safety training program improvement. The emphasis is on academic rather than hands-on training. This allows a decoupling of these guidelines from specific facilities. It would be unrealistic to dictate a universal program of training because of the wide variation of operations, levels of experience, and work environments among DOE contractors and facilities. Hence, these guidelines do not address the actual implementation of a nuclear criticality safety training program, but rather they outline the general characteristics that should be included.

  7. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Science.gov (United States)

    2013-08-07

    ... Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations AGENCY: Department... comments on past performance evaluations and making past performance evaluations available to source... Decisions'', require revisions to the acquisition regulations on past performance evaluations so...

  8. Innovation Strategy in Slovak Forest Contractor Firms—A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Martina Štěrbová

    2016-05-01

    Full Text Available The aim of the study is to determine the innovation strategy of contractor firms in the Slovak forestry service sector in the area of further innovation activities development. The strategy identification was based on the analysis of the strengths, weaknesses, opportunities and threats in this sector. The results indicate that weaknesses of contractor firms exceed their strengths and, considering the degree and importance of their impact, opportunities exceed identified threats. Based on these findings revealing the relations in the area of innovation activities of forestry service contractors, the “Strategy of Partnership” was suggested as the most suitable type of strategy. It can be concluded that such a form of grouping cooperation brings many benefits to contractors in the form of information availability, guidance, training, and management of conflicts, risks and uncertainty, which are associated with the innovation process.

  9. Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies.

  10. 77 FR 7108 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Science.gov (United States)

    2012-02-10

    ... of Federal Contract Compliance Programs 41 CFR Part 60-741 RIN 1250-AA02 Affirmative Action and...) proposes revising the regulations implementing the nondiscrimination and affirmative action regulations of... rule entitled, ``Affirmative Action and Nondiscrimination Obligations of Contractors and...

  11. Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives

    Directory of Open Access Journals (Sweden)

    Alan Griffith

    2012-11-01

    Full Text Available Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

  12. 76 FR 23357 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Science.gov (United States)

    2011-04-26

    ... the contractor to state and thereby affirm in solicitations and advertisements that it is an equal... discussed in Sec. 60-250.2, above. Section 60-250.24 Drugs and alcohol We propose a correction to...

  13. A new forecast presentation tool for offshore contractors

    Science.gov (United States)

    Jørgensen, M.

    2009-09-01

    Contractors working off shore are often very sensitive to both sea and weather conditions, and it's essential that they have easy access to reliable information on coming conditions to enable planning of when to start or shut down offshore operations to avoid loss of life and materials. Danish Meteorological Institute, DMI, recently, in cooperation with business partners in the field, developed a new application to accommodate that need. The "Marine Forecast Service” is a browser based forecast presentation tool. It provides an interface for the user to enable easy and quick access to all relevant meteorological and oceanographic forecasts and observations for a given area of interest. Each customer gains access to the application via a standard login/password procedure. Once logged in, the user can inspect animated forecast maps of parameters like wind, gust, wave height, swell and current among others. Supplementing the general maps, the user can choose to look at forecast graphs for each of the locations where the user is running operations. These forecast graphs can also be overlaid with the user's own in situ observations, if such exist. Furthermore, the data from the graphs can be exported as data files that the customer can use in his own applications as he desires. As part of the application, a forecaster's view on the current and near future weather situation is presented to the user as well, adding further value to the information presented through maps and graphs. Among other features of the product, animated radar and satellite images could be mentioned. And finally the application provides the possibility of a "second opinion” through traditional weather charts from another recognized provider of weather forecasts. The presentation will provide more detailed insights into the contents of the applications as well as some of the experiences with the product.

  14. GY-20和GY-40型大容量钴-60运输容器关键技术研究%Key Technology Studies of GY-20 and GY-40 High-Capacity Cobalt-60 Transport Casks

    Institute of Scientific and Technical Information of China (English)

    刘慧芳; 张鑫

    2012-01-01

    GY -20和GY- 40型大容量钴-60运输容器是为运输工业用钴-60成品源和钴-60棒束而设计的专用设备.由于内容物放射性活度水平高、衰变热大,仅有加拿大、英国、俄罗斯等少数国家具有设计能力.本文综合考虑容器结构、热工、力学、屏蔽等方面的要求,对容器设计和制造过程中的关键技术以及解决方案进行了分析研究.试验验证结果表明,容器的结构设计、包铅边界设计准则的确定和制造过程的质量控制措施合理、有效,能保证容器在各种工况下的屏蔽完整性,容器具有安全运输大容量钴-60源项的能力,其设计满足相关标准和规范要求,可为其他B型货包的设计提供参考.%GY-20 and GY-40 high-capacity cobalt-60 transport,casks are used to transport cobalt-60 industrial irradiators and cobalt-60 bundles. The radioactive contents have special features of high-activity and high residual heat, so only a few countries such as Canada, England and Russia have design capacity. The key technologies and corresponding solutions were studied for the design and manufacture of the cask taking into account the structural, thermal, mechanics and shield requests. A series of tests prove that the cask structure design, design criteria for lead coating structure and quality control measurements are reasonable and effective, and the cask shield integrity can be ensured for all conditions. The casks have ability to transport high-activity sealed sources safely, and the design of cask satisfies the requirement of design code and standard. It can provide reference for other B type package.

  15. Bias estimates used in lieu of validation of fission products and minor actinides in MCNP Keff calculations for PWR burnup credit casks

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Don [ORNL; Marshall, William BJ J [ORNL; Wagner, John C [ORNL; Bowen, Douglas G [ORNL

    2015-09-01

    The U.S. Nuclear Regulatory Commission (NRC) Division of Spent Fuel Storage and Transportation recently issued Interim Staff Guidance (ISG) 8, Revision 3. This ISG provides guidance for burnup credit (BUC) analyses supporting transport and storage of PWR pressurized water reactor (PWR) fuel in casks. Revision 3 includes guidance for addressing validation of criticality (keff) calculations crediting the presence of a limited set of fission products and minor actinides (FP&MA). Based on previous work documented in NUREG/CR-7109, recommendation 4 of ISG-8, Rev. 3, includes a recommendation to use 1.5 or 3% of the FP&MA worth to conservatively cover the bias due to the specified FP&MAs. This bias is supplementary to the bias and bias uncertainty resulting from validation of keff calculations for the major actinides in SNF and does not address extension to actinides and fission products beyond those identified herein. The work described in this report involves comparison of FP&MA worths calculated using SCALE and MCNP with ENDF/B-V, -VI, and -VII based nuclear data and supports use of the 1.5% FP&MA worth bias when either SCALE or MCNP codes are used for criticality calculations, provided the other conditions of the recommendation 4 are met. The method used in this report may also be applied to demonstrate the applicability of the 1.5% FP&MA worth bias to other codes using ENDF/B V, VI or VII based nuclear data. The method involves use of the applicant s computational method to generate FP&MA worths for a reference SNF cask model using specified spent fuel compositions. The applicant s FP&MA worths are then compared to reference values provided in this report. The applicants FP&MA worths should not exceed the reference results by more than 1.5% of the reference FP&MA worths.

  16. Conceptual design of a high-integrity impact limiter for use in shipment of dual-purpose spent-fuel casks

    Energy Technology Data Exchange (ETDEWEB)

    Nickell, R.E. (Applied Science and Technology, Inc., Poway, CA (United States)); Haelsig, R.T.; Hansen, L.J. (Hansen Haelsig Associates, Bellevue, Washington (USA))

    1991-09-01

    A conceptual design for a high-integrity impact limiting system to protect dry metallic spent fuel storage casks during rail transport is proposed. The system is intended to limit the deceleration of the cask during severe rail accidents through three layers of energy-absorbing polyurethane foam material. The crush strengths of the foam is chosen such that the lowest crush strength foam forms the most exterior layer, with the crush strengths increasingly progressively in the two inner layers. The design basis for the external layer of foam is the hypothetical 30-foot free drop impact event prescribed in 10 CFR 71, with a peak steady deceleration limit of about 75 g. The two interior layers absorb up to five times the impact energy of the 30-foot free drop while limiting the decelerations to first 125 g and then to 175 g. The former is felt to be a nominal fuel rod failure threshold, while the latter is at or near the failure level for bolted closure assemblies. These deceleration targets, if met, provide a means for substantially reducing the risk of radioactive material transport. The conceptual design incorporates features for maintaining the integrity of the impact limiter attachment system during severe accidents and enhancing heat dissipation through the impact limiter for short-cooled fuel, through the use of radial aluminum fins. An alternative impact-limiting material -- aluminum honeycomb -- is included in the economic assessment. Both the polyurethane foam and aluminum honeycomb designs appear to meet a cost target of $1.0M, with the polyurethane foam limiter cost estimated at somewhat less than $400K and the aluminum honeycomb cost at somewhat less than $700K. 28 refs., 17 figs., 5 tabs.

  17. Characterization of emergency preparedness at DOE contractor facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gillings, J.C.; Murphy, B.L.; Corbit, C.D.; MacLellan, J.A.; Essig, T.H.; Higby, D.P.; Hooker, C.D.; Laughlin, G.J.; Stoetzel, G.A.; Swinth, K.L.

    1984-07-01

    A study of emergency preparedness capabilities at DOE facilities was initiated following the incident at the Three Mile Island (TMI) Nuclear Power Station. It was designed to parallel but expand on a study on emergency preparedness instrumentation that was conducted in 1970 by Pacific Northwest Laboratory. The 1970 survey findings led to the publication of four reports on performance criteria for radiological emergency instrumentation. Three of these reports - BNWL-1635 (Selby et al. 1972), BNWL-1742 (Anderson et al. 1974) and BNWL-1857 (Andersen et al. 1976) - addressed the criteria for emergency instrumentation at reactors, mixed oxide fuel fabrication plants, and fuel reprocessing plants, respectively. The fourth report, BNWL-1991 (Bramson et al. 1976), addressed evaluation testing and calibration methodology for these instruments. This report is presented in three parts. Part One is a review of the BNWL documents to determine whether they are applicable to state-of-the-art instrument capabilities. The Appendix to Part One provides a comparison between the instrument performance criteria established in BNWL-1991 to applicable American National Standards Institute (ANSI) standards for portable survey and contamination meters, installed radiation and area monitors, effluent monitors, calibration techniques, criticality detection systems, alarm systems, and direct reading dosimeters. Part Two compares the 1970 survey results with the 1980 survey results to identify trends in emergency preparedness. Part Three is a discussion of the results of the 1980 emergency preparedness survey and the supporting data for each of the 15 modules. 8 references. (ACR)

  18. Investigation of the behaviour of impact limiting devices of transport casks for radioactive materials in the package approval and risk analysis; Untersuchung des Verhaltens stossdaempfender Bauteile von Transportbehaeltern fuer radioaktive Stoffe in Bauartpruefung und Risikoanalyse

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, Martin

    2009-08-20

    Transport casks for radioactive materials with a Type-B package certificate have to ensure that even under severe accident scenarios the radioactive content remains safely enclosed, in an undercritical arrangement and that ionising radiation is sufficiently shielded. The impact limiter absorbs in an accident scenario the major part of the impact energy and reduces the maximum force applied on the cask body. Therefore the simulation of the behaviour of impact limiting devices of transport casks for nuclear material is of great interest for the design assessment in the package approval as well as for risk analysis in the field of transport of radioactive materials. The behaviour of the impact limiter is influenced by a number of parameters like impact limiter construction, material properties and loading conditions. Uncertainties exist for the application of simplified numerical tools for calculations of impact limiting devices. Uncertainities exist when applying simplified numerical tools. A model describing the compression of wood in axial direction of wood under large deformations for simulation with complex numerical procedures like dynamic Finite Element Methods has not been developed yet. Therefore this thesis concentrates on deriving a physical model for the behaviour of wood and analysing the applicability of different modeling techniques. A model describing the compression of wood in axial direction under large deformations was developed on the basis of an analysis of impact limiter of prototypes of casks for radioactive materials after a 9-m-drop-test and impact tests with wooden specimens. The model describes the softening, which wood under large deformation exhibits, as a function of the lateral strain constraint. The larger the lateral strain restriction, the more energy wood can absorb. The energy absorption capacity of impact limiter depends therefore on the ability of the outer steel sheet structure to prevent wood from evading from the main

  19. Results of the Navy Quality of Life Survey

    Science.gov (United States)

    2005-05-01

    university student contractors were directed to complete the Web version and report any difficulties that they encountered. They completed the survey on fast...Aviation Squadron/Detachment Aircraft Carrier Cruiser Destroyer types (includes frigates) Minecraft Submarine Tender/Repair ship Reserve Unit Service...COMMENTS Fom: SOC0104 OCTOBER 2001 Distribution AIR UNIVERSITY LIBRARY AIRFORCE RESEARCH LABORATORY (CODE 13) ARMY MANAGEMENT STAFF COLLEGE

  20. Defense Logistics Agency Aviation Can Improve its Processes to Obtain Restitution From Contractors That Provide Defective Spare Parts

    Science.gov (United States)

    2016-02-23

    identify inventory items in the DoD supply system. 8 The $12.3 million represents the projected value of the defective parts that were not replaced or...the contractor incorrectly manufactured all 100 parts and the contractor agreed to replace them if returned. To properly account for all 100... value for each part. Finding DODIG-2016-052 │ 11 Process to Return Defective Parts to Contractors for Replacement Was Not Effective DLA Aviation

  1. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, Alan [Chockie Group International, Inc., Seattle, WA (United States)

    2005-09-15

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  2. Second technical contractors' conference on peat

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    This conference reported the status of the US Department of Energy Peat Program. The program includes peat resource surveys of eleven states, peat gasification process and equipment studies, dewatering studies, and environmental and socioeconomic factors in the development of peat technology. Separate abstracts were prepared for selected papers. (CKK)

  3. Fourth technical contractors' conference on peat

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This conference reported the status of the US Department of Energy Peat Program. The papers presented dealt with peat dewatering, international peat programs, environmental and socio-economic factors, peat gasification, peat harvesting, and the state peat surveys for 14 states. Separate abstracts were prepared for the individual papers. (CKK)

  4. A methodology for performance specifications and guarantees to reconcile owner/contractor criteria

    Energy Technology Data Exchange (ETDEWEB)

    Ahner, D.J.; Priestley, R.R. [Power Technologies, Inc., Schenectady, NY (United States)

    1996-05-01

    The performance objectives of a plant owner and the turnkey contractor may not generally be compatible or represent the same levels of acceptable risk for a given application. The owner is concerned that the plant has a high performance level that contributes to a high probability of meeting acceptable financial return goals. The contractor is concerned with demonstrating a plant performance that meets the guarantees with an acceptable level of risk. The economic incentives and competitive environment introduce influences which can negatively impact performance margins and increase the owners and contractor`s risk levels to secure a positive evaluation In advantage. Ibis paper discusses these owner/contractor objectives and develops a methodology to identify regions of compatibility and conflict to the performance specification. The objectives and risk thresholds are quantified in terms of risk or probability of meeting specific performance goals for each party. The effects and influence of key parameters such as guarantee margins, performance variability and test quality is illustrated by application examples.

  5. BUSINESS STRATEGY OF LARGE CONTRACTORS IN ADOPTING INDUSTRIALISED BUILDING SYSTEM (IBS: THE MALAYSIAN CASE

    Directory of Open Access Journals (Sweden)

    FRANKY AMBON

    2012-12-01

    Full Text Available Industrialised Building System (IBS is the term coined by the government and industry in Malaysia to represent the construction industry and the application of prefabrication method in building construction. The purpose of this exploratory research paper is to highlight business strategy being pursued by large Malaysian contractors in adopting IBS. The paper uses case study as research method. The analysis is based primarily on cross-case analysis and pattern matching technique. The paper observes contractors which involved in IBS are part of larger holding companies in a corporate set-up include design and manufacturing subsidiaries. The companies positioned themselves as one-stop total solution provider for IBS and offer a wider range of services from design, production, and installation to clients. To become competitive and able to create total solution, contractors need to establish cluster and consortium of integrated project team by creating a partnership when and where it is needed. A vendor development programme modelled along the lines of the development of automotive industry should also be established. Future empirical studies should extensively examine these areas, especially the development of business model for contractors. The availability of this model could help to accelerate the uptake of IBS among contractors.

  6. Management of government personal property in the hands of contractors. Handbook for contracting officers and staff

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    This manual is divided into three parts. Part One applies to the management of Government personal property within the Department of Energy in general terms. Part Two describes the specifics of the application of personal property management techniques to On-Site Contractors. Part three applies to Off-Site Contractors. Part One introduces the field of property management. It discusses: the legal basis and requirements established by Federal Statutes and the parallel authorities and responsibilities; the related evolution of the Department of Energy; the regulation system within the Federal Government and its implementation by the Department for personal property management. The life cycle of equipment is presented and how control over personal property is maintained through an accountability system. Classifications of property and contract clauses are discussed. The relationships of contracting officers and property administrators with contractors are presented in each of the discussions as appropriate. Part One consists of only one chapter and is applicable to the management of property utilized by all types of contractors. It provides the foundation to explore in some detail the actions and interactions that occur between the Department's procurement and property personnel and those of the contractor. This exploration in depth is made in Parts Two and Three.

  7. The experiences of security industry contractors working in Iraq: an interpretative phenomenological analysis.

    Science.gov (United States)

    Messenger, Katy; Farquharson, Lorna; Stallworthy, Pippa; Cawkill, Paul; Greenberg, Neil

    2012-07-01

    To explore the occupational experiences of private security contractors working in a war zone and how it impacts on their mental health. Semistructured interviews were conducted with seven contractors employed by a large UK-based private security company. Interpretative phenomenological analysis was used to analyze the interview transcripts. Participants also completed the 12-item General Health Questionnaire and the Posttraumatic Stress Disorder Checklist. Four overarching themes emerged: the appeal of the job; vulnerability; keep going; and seeking help for stress in the workplace. No clinically significant levels of distress were reported. Contractors are frequently exposed to stressors known to increase risk of psychiatric difficulty in military personnel. A number of potential protective factors were identified. Only a minority of participants were open to seeking help for mental health difficulties.

  8. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  9. Decree no. 2001-1199 of the 10 december 2001 publishing the resolution MSC. 88 (71) notifying adoption of the international compilation of safety rules for the spent nuclear fuels, plutonium and high level radioactive wastes transport in casks on ships (compilation INF) (annexes), adopted at London the 27 may 1999; Decret no. 2001-1199 du 10 decembre 2001 portant publication de la resolution MSC.88 (71) portant adoption du recueil international de regles de securite pour le transport de combustible nucleaire irradie, de plutonium et de dechets hautement radioactifs en colis a bord de navires (recueil INF) (ensemble une annexe), adoptee a Londres le 27 mai 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This legislative text concerns the safety rules of spent nuclear fuels, plutonium and high level radioactive wastes transport, in casks on ships. Rules, fire prevention, temperature control of casks, electric supply, radioprotection, management and emergency plans are detailed. (A.L.B.)

  10. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Science.gov (United States)

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition... EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4(a), EPA Form 1900-27 shall be used by the Project Officer to record his/her evaluation of...

  11. 48 CFR 3.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 3.104-4... marking of contractor bid or proposal information and source selection information. (a) Except as... information or source selection information to any person other than a person authorized, in accordance...

  12. 48 CFR 2903.104-5 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 2903.104-5... contractor bid or proposal information and source selection information. (a) Government employees serving in the following positions are authorized access to proprietary or source selection information, but...

  13. 48 CFR 203.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 203.104-4....104-4 Disclosure, protection, and marking of contractor bid or proposal information and source selection information. (d)(3) For purposes of FAR 3.104-4(d)(3) only, DoD follows the...

  14. 48 CFR 1503.104-5 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ... marking of contractor bid or proposal information and source selection information. 1503.104-5 Section... marking of contractor bid or proposal information and source selection information. (a)(1) The Chief of.... 2. I agree to use any proposal information only for evaluation purposes. I agree not to copy...

  15. 40 CFR 35.4240 - What provisions must my group's TAG contractor comply with if it subcontracts?

    Science.gov (United States)

    2010-07-01

    ...) Section 35.4235 pertaining to contract provisions; and (h) Cost principles in 48 CFR part 31, the Federal... contractor comply with if it subcontracts? 35.4240 Section 35.4240 Protection of Environment ENVIRONMENTAL... with if it subcontracts? A TAG contractor must comply with the following provisions when...

  16. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    Science.gov (United States)

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  17. Financial Health Indicators: An Analysis Of Financial Statement Information To Determine The Financial Health Of DOD Contractors

    Science.gov (United States)

    2016-12-01

    the financial health of prospective contractors. In fact, according to the Federal Acquisition Regulation (FAR), the very first general requirement ...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT FINANCIAL HEALTH INDICATORS: AN ANALYSIS OF FINANCIAL...STATEMENT INFORMATION TO DETERMINE THE FINANCIAL HEALTH OF DOD CONTRACTORS December 2016 By: Timothy J. Grant Tony L. Ingram Darnell D

  18. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Science.gov (United States)

    2010-10-01

    ... modification of the license, DOE shall furnish the Contractor a written notice of its intention to revoke or.... The Government has certain rights in the invention.” (6) Avoidance of royalty charges. If the... subcontracts. The Contractor agrees to include the substance of this clause in subcontracts at any tier that...

  19. Final Report-Confirmatory Survey Results for the ABB Combustion Engineering Site, Windsor, Connecticut; Revision 1 (DCN 5158-SR-02-1) (Docket No. 030-03754; RFTA No. 12-003)

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, WADE C

    2013-01-28

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.

  20. Contractor Support on the Battlefield -- Increased Reliance Requires Commander’s Attention

    Science.gov (United States)

    2006-05-16

    252.222-7002 requires contractors to comply with local labor laws and regulations on issues such as working hours, collective bargaining agreements...Enforces Labor Law in Iraq”, Los Angeles Times, 26 April 2006, <http://ebird.afis/mil/ebfiles/e20060426431301.html>, [27 April 2006]. 31 McCullough

  1. 76 FR 52659 - Access by EPA Contractors to Confidential Business Information (CBI) Related to the Greenhouse...

    Science.gov (United States)

    2011-08-23

    ... AGENCY Access by EPA Contractors to Confidential Business Information (CBI) Related to the Greenhouse Gas... be submitted to EPA under the Greenhouse Gas Reporting Program that may be designated or claimed as... FURTHER INFORMATION CONTACT: Carole Cook, Climate Change Division, Office of Atmospheric Programs...

  2. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Business Ethics, and should not be limited to exclude FFRDCs. Comments: Several respondents addressed the... established structures required for implementation of the Contractor Code of Business Ethics for... ethics rules that apply to Government employees. Response: The Councils recognize that most of the ethics...

  3. Department of Defense Contractor and Troop Levels in Iraq and Afghanistan: 2007-2016

    Science.gov (United States)

    2016-08-15

    Specialist Moshe Schwartz Specialist in Defense Acquisition Lawrence Kapp Specialist in Military Manpower Policy August 15, 2016 Congressional Research...Background, Analysis, and Issues for Congress, by Moshe Schwartz . The Role of Contractors in Military Operations Throughout its history, DOD has...Background and Analysis, by Moshe Schwartz and Joyprada Swain. 4 See Department of Defense

  4. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Science.gov (United States)

    2012-06-15

    ... Predeployment and Operational Tracker (SPOT) System,'' effective through March 31, 2013. No impact is... functions means the following activities engaged in by a contractor: (i) Guarding of personnel, facilities...) Any other activity for which personnel are required to carry weapons in the performance of...

  5. 48 CFR 627.203 - Patent indemnification of Government by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Patent indemnification of Government by contractor. 627.203 Section 627.203 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents 627.203 Patent indemnification...

  6. Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Arguello, Bryan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

  7. 48 CFR 22.1008-2 - Section 4(c) successorship with incumbent contractor collective bargaining agreement.

    Science.gov (United States)

    2010-10-01

    ... contracting agency receives notice of the terms of the collective bargaining agreement less than 10 days..., requires the incumbent prime contractor to furnish the contracting officer a copy of each collective bargaining agreement.) (2) If the contracting officer has timely received the collective bargaining agreement...

  8. 75 FR 60264 - Federal Acquisition Regulation; Encouraging Contractor Policies To Ban Text Messaging While Driving

    Science.gov (United States)

    2010-09-29

    ... outreach programs to inform employees about the safety risks associated with texting while driving. The... the safety risks associated with texting while driving. (d) Subcontracts. The Contractor shall insert... Driving AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and...

  9. Radiation exposures for DOE contractor employees-1988. Twenty-first annual report

    Energy Technology Data Exchange (ETDEWEB)

    Merwin, S. E. [Pacific Northwest Lab., Richland, WA (United States); Millet, W. H. [Pacific Northwest Lab., Richland, WA (United States); Idaho National Engineering Lab., Idaho Falls, ID (United States); Traub, R. J. [Pacific Northwest Lab., Richland, WA (United States)

    1990-12-01

    This report is one of a series of annual reports provided by the U.S. Department of Energy (DOE) summarizing occupational radiation exposures received by DOE and DOE contractor employees. These reports provide an overview of radiation exposures received each year and identify trends in exposures being experienced over the years.

  10. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Science.gov (United States)

    2010-10-01

    ... Services, or delivered under Schedule II, Inbound Services— (1) If notified within one year after delivery..., the liability is for the full cost of satisfactory repair or for the current replacement value of the...) The Contractor's liability shall be for the full cost of satisfactory repair, or for the...

  11. 75 FR 43116 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors...

    Science.gov (United States)

    2010-07-23

    ... of Federal Contract Compliance Programs 41 CFR Part 60-741 RIN 1250-AA02 Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors; Evaluation of Affirmative Action Provisions Under... public to provide input on how OFCCP can strengthen the affirmative action requirements of...

  12. 7 CFR 1955.127 - Selection and use of contractors to dispose of inventory property.

    Science.gov (United States)

    2010-01-01

    ... inventory property. 1955.127 Section 1955.127 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM... Disposal of Inventory Property Use of Contractors to Dispose of Inventory Property § 1955.127 Selection and...

  13. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Science.gov (United States)

    2010-10-01

    ... copies of the patent application file, by the Government, when a Federal Government employee is a... subparagraph (c)(1). NASA prefers that the contractor use either the electronic or paper version of NASA Form.... Both the electronic and paper versions of NASA Form 1679 may be accessed at the electronic New...

  14. Memo of Readiness to Proceed with Phase 1 Privatization for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    HONEYMAN, J.O.

    2000-04-24

    This Readiness to Proceed Memorandum provides the CH2M HILL Hanford Group, Inc. formal certification of readiness to proceed with provision of the waste feed and infrastructure to handle the products from the privatization contractor's waste processing plant. Summary information is included from the integrated scope-cost-schedule baseline, the analyses of the baseline, management systems, and systems reviews.

  15. Tort Suits Against Federal Contractors: An Overview of the Legal Issues

    Science.gov (United States)

    2011-04-07

    to Tort Lawsuits against Military Contractors, 34 BROOKLYN J. INT’L L. 395, 419 (2009). A narrow reading is arguably in keeping with the Supreme...indemnification under this clause.”). 165 See, e.g., E.I. Du Pont De Nemours & Co., Inc. v. United States, 365 F.3d 1367 (Fed. Cir. 2004) (finding that the

  16. Perceptions of success in performance-based procurement: Differences between clients and contractors

    NARCIS (Netherlands)

    Duren, van J.M.A.; Dorée, André G.; Voordijk, Hans

    2015-01-01

    Purpose – The purpose of this study is to analyse, from the perspective of agency theory, differences between client and contractor in their perceptions of changes in uncertainty and in inclination to opportunistic behaviour while using a performance-based procurement procedure. In agency theory, d

  17. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    Energy Technology Data Exchange (ETDEWEB)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.

  18. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    Science.gov (United States)

    2008-09-29

    Cambridge University Press, 2005; Simon Chesterman and Chia Lehnardt. From Mercenaries to Market: The Rise and Regulation of Private Military Companies...to ESS Support Services Worldwide “which in turn was providing dining services and construction for other contractors such as KBR and Fluor

  19. 48 CFR 245.604 - Restrictions on purchase or retention of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ..., purchase, or retention at less than cost. (3) Demilitarization. The contractor shall demilitarize... accordance with Defense Demilitarization Manual, DoD 4160.21-M-1. In unusual cases the plant clearance officer may authorize the purchaser to perform the demilitarization; however, the purchaser shall not...

  20. 48 CFR 1837.203-70 - Providing contractors access to sensitive information.

    Science.gov (United States)

    2010-10-01

    ... require access to sensitive information in the Government's possession, which may be entitled to... access to sensitive information. 1837.203-70 Section 1837.203-70 Federal Acquisition Regulations System... Advisory and Assistance Services 1837.203-70 Providing contractors access to sensitive information....

  1. Radiation Exposures for DOE and DOE Contractor Employees - 1989. Twenty-second annual report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M. H. [Pacific Northwest Lab., Richland, WA (United States); Eschbach, P. A. [Pacific Northwest Lab., Richland, WA (United States); Harty, R. [Pacific Northwest Lab., Richland, WA (United States); Millet, W. H. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Scholes, V. A. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1992-12-01

    This report is one of a series of annual reports provided by the U.S. Department of Energy (DOE) summarizing occupational radiation exposures received by DOE and DOE contractor employees. These reports provide an overview of radiation exposures received each year and identify trends in exposures being experienced over the years.

  2. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Science.gov (United States)

    2010-05-24

    ...: 9000-AL60 Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of..., company name (if any), and ``FAR Case 2009-027'' on your attached document. Fax: 202-501-4067. Mail... over contractor CACs. A CAC is the DoD term for a Personal Identity Verification (PIV) card. A PIV...

  3. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ... management system vehicles. A notice was published in the Federal Register at 78 FR 23935, on April 23, 2013... Register on March 5, 2010 (75 FR 10267). No public comments were received in prior years that have... Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles...

  4. Reforming the American Military Officer Personnel System: Addendum: Thoughts on Contractors

    Science.gov (United States)

    2016-05-24

    ceilings. • Implement the provisions of A-76 that restrict outsourcing to functions that are not “inherently governmental.” Absent from the above list is...appropriate roles of contractors and government employees, and ensure that it can recruit , train, develop, and retain a skilled and qualified workforce. There

  5. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... and contract clauses, was revised to include the prescription for a new clause at 52.204-YY, Central... Contractor Registration, or the provision at 52.212-1, Instructions to Offerors--Commercial Items. (c... that use a Governmentwide commercial purchase card as both the purchasing and payment mechanism,...

  6. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    MERCADO, L.C.

    2000-04-22

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

  7. HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

    Energy Technology Data Exchange (ETDEWEB)

    CANNELL GR

    2009-11-19

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  8. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... AGENCY Clean Water Act; Contractor Access to Confidential Business Information AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The Environmental Protection Agency's (EPA) Office of Water... standards under the Clean Water Act (CWA). Interested persons may submit comments on this intended...

  9. 32 CFR 728.79 - Employees of Federal contractors and subcontractors.

    Science.gov (United States)

    2010-07-01

    ... PERSONNEL MEDICAL AND DENTAL CARE FOR ELIGIBLE PERSONS AT NAVY MEDICAL DEPARTMENT FACILITIES Other Persons... contractor, engineering, and technical service personnel designated as U.S. Navy Technicians. (2) Civilian... paragraph (a) (1) and (2) of this section may be provided emergency care in naval MTFs for illnesses...

  10. 41 CFR 101-25.103-3 - Trading stamps or bonus goods received from contractors.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Trading stamps or bonus... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103-3 Trading stamps or bonus goods received from contractors. When contracts contain a price reduction clause, any method (such as trading stamps or...

  11. 78 FR 44158 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2013-07-23

    ... indentured child labor: Product Country Cattle South Sudan. Dried Fish Bangladesh. Fish Ghana. Garments... Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to Executive Order 13126... (``Prohibition of Acquisition of Products Produced by Forced or Indentured Child Labor''), in accordance with the...

  12. Proceedings of the natural gas RD&D contractors review meeting, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D.

    1995-04-01

    This report contains papers which were presented at the natural gas contractors review meeting held on April 4-6, 1995. Topics were concerned with resource and reserves, low permeability reservoir characterization, natural fracture detection, drilling, completion, and stimulation, and natural gas upgrading. Individual papers were processed separately for the United States Department of Energy databases.

  13. 48 CFR 245.603-71 - Disposal of contractor inventory for NATO cooperative projects.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Disposal of contractor inventory for NATO cooperative projects. 245.603-71 Section 245.603-71 Federal Acquisition Regulations... inventory for NATO cooperative projects. (a) North Atlantic Treaty Organization (NATO) cooperative...

  14. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2013-01-29

    ... 9000-AM13 Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor... excise tax on certain Federal procurement payments to foreign persons. The rule disallows the cost associated with the 2 percent excise tax on certain foreign procurements. DATES: Effective Date: February 28...

  15. 78 FR 65244 - Defense Federal Acquisition Regulation Supplement: Contractor Personnel Supporting U.S. Armed...

    Science.gov (United States)

    2013-10-31

    ... it with the changes in applicability, terminology, and other revisions made by Department of Defense..., including OCS program management, contract support integration, and integration of defense contractor..., terminology aid in determining which groups qualify for different types of Government support and are based...

  16. Current information technology needs of small to medium sized apparel manufacturers and contractors

    Energy Technology Data Exchange (ETDEWEB)

    Wipple, C.; Vosti, E.

    1997-11-01

    This report documents recent efforts of the American Textile Partnership (AMTEX) Demand Activated Manufacturing Architecture (DAMA) Project to address needs that are characterized of small to medium sized apparel manufactures and contractors. Background on the AMTEX/DAMA project and objectives for this specific efforts are discussed.

  17. Capital Budgeting Evaluation Practices of Building Contractors in Hong Kong

    Directory of Open Access Journals (Sweden)

    K.C Lam

    2012-11-01

    Full Text Available This paper reports the results of an investigation into capital budgeting evaluation practicesin the construction industry of Hong Kong. The aim of this study was to identify thepopularity and extent of usage of various techniques for capital budget evaluation, investmentappraisal, risk analysis, and management science. The current study was comparedwith a similar survey conducted in 1994 to establish the changes in the capital budgetingevaluation practices of contracting firms over time. The results indicate that there was ageneral increase in the popularity and extent of usage in certain capital budget evaluationtechniques such as “best/worst estimate” and “formal financial evaluation”. In addition,the evaluation techniques examined were fitted into a discriminant function analysis (DFA,and a model has been developed which allows contracting firms to be classified accordingto their predominant characteristics in capital budget evaluation.

  18. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  19. An Analysis of Cost Management Strategies Employed By Building Contractors on Projects in Zimbabwe

    Directory of Open Access Journals (Sweden)

    Benviolent Chigara

    2013-11-01

    Full Text Available The construction industry is a major consumer of capital resources by virtue of the magnitude, complexity and nature of the works it executes. Yet improving cost performance still remains a chronic challenge facing the construction industry worldwide. Apart from advances made by contractors to devise mechanisms to manage project cost, studies across the world reveal that construction projects are hardly completed within budget. The Zimbabwean construction industry has not been spared either. However, this background is considered unhealthy for an industry whose capital consumption is heavy and concomitant cost overruns spell disastrous financial consequences on the investor. This study explored cost management strategies employed by contractors on building projects and also investigated the challenges that contractors encounter in managing project cost. Exploratory research design was employed making use of both questionnaires and interviews to collect data from selected contractors registered under category A, B and C of the Construction Industry Federation of Zimbabwe (CIFOZ. The study observed that in the majority of cases, contractors’ efforts to manage projects costs are centred on management of project resources. Additionally, monthly cost reports, variance management, project budgets and cash flow forecasting are among the other strategies. However,  in spite of the growing trend to automate cost control systems, there is evidence to suggest that the traditional paper based systems of storing and managing information is widely used in the industry. Contrary to having cost management systems in place, contractors admit experiencing cost overruns on their projects. These cost overruns are attributable to organizational related challenges, shortage of skilled personnel, and unavailability of some building materials on the local market, variations and deficiency in cost control systems

  20. THE PERCEPTIONS OF DEVELOPERS, CONSULTANTS AND CONTRACTORS ON THE RELATIVE IMPORTANCE OF PARTNERING IN MALAYSIAN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    ABDELNASR OMRAN,

    2011-04-01

    Full Text Available Partnering is a cooperative approach to project management that recognizes the importance of all members of the project team, established harmonious working relationships among them, and resolves issues in a timely manner, minimizing impact on project execution. This paper was assessed the perceptions of developers, consultants and contractors on the relative importance of partnering in Malaysian construction industry. This was done by first identifying the problem and objectives of the research through a thorough literature reviewbased on reliable sources, followed by a comprehensive quantitative data collection through questionnaire surveys. The data was then processed using descriptive analysis to tie up with the objectives, followed by formulating of conclusions. The research revealed that, majority of the respondents agreed that, partnering project is a cost effective and it produces a good quality. In addition, the respondents have also agreed that sharing resources, team development, conducting regular meetings and also assessment of all the partners’ performance are important in setting up a partnering relationship.

  1. John F. Kennedy Space Center, Safety, Reliability, Maintainability and Quality Assurance, Survey and Audit Program

    Science.gov (United States)

    1994-01-01

    This document is the product of the KSC Survey and Audit Working Group composed of civil service and contractor Safety, Reliability, and Quality Assurance (SR&QA) personnel. The program described herein provides standardized terminology, uniformity of survey and audit operations, and emphasizes process assessments rather than a program based solely on compliance. The program establishes minimum training requirements, adopts an auditor certification methodology, and includes survey and audit metrics for the audited organizations as well as the auditing organization.

  2. Loading 076 assemblies in two IV-04 transport casks for transport to the U.S. Savannah River Site (SC); Trasferimento di 72 elementi irraggiati MTR dalla piscina dell`impianto EUREX a due contenitori IU-04 per il trasporto al Savannah River Site-Department of Energy (USA)

    Energy Technology Data Exchange (ETDEWEB)

    Gili, Michele [ENEA, Centro Ricerche Saluggia, Vercelli (Italy). Dipt. Energia

    1997-09-01

    The National Agency for New Technologies and the Environments has signed with the US Department of Energy a contract for the transfer of 150 irradiated MTR fuel assemblies stored in the EUREX plant pool at The National Agency for New Technologies and the Environments Research Centre of Saluggia. The first scheduled transport has been made in february 1997 and has involved the successful loading of 76 assemblies in two IU-04 (Pegase) transport casks. The loaded casks have been shipped to the U.S. Savannah River Site (SC).

  3. Building America Best Practices Series. Volume 17 - Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Adams, K. T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hefty, M. G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gilbride, T. L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Love, Pat M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-05-01

    This guide will help contractors and homeowners identify ways to make their homes more comfortable, more energy efficient, and healthier to live in. It also identifies the steps to take, with the help of a qualified home performance contractor, to increase their home’s insulation, ensure healthy levels of ventilation, and prevent moisture problems. Contractors can use this document to explain the value of these insulation measures to their customers. The references in this document provide further explanation of insulation techniques and technologies.

  4. Environmental Survey preliminary report, Stanford Linear Accelerator Center, Stanford, California

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-01

    This report presents the preliminary findings from the first phase of the Survey of the US Department of Energy (DOE) Stanford Linear Accelerator Center (SLAC) at Stanford, California, conducted February 29 through March 4, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the SLAC. The Survey covers all environmental media and all areas of environmental regulation and is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations at the SLAC, and interviews with site personnel. The Survey team is developing a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the SLAC facility. The Interim Report will reflect the final determinations of the SLAC Survey. 95 refs., 25 figs., 25 tabs.

  5. Environmental Survey preliminary report, Feed Materials Production Center, Fernald, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    This report presents the preliminary findings from the first phase of the environmental survey of the United States Department of Energy (DOE) Feed Materials Production Center (FMPC), conducted June 16 through 27, 1986. The survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the survey is to identify environmental problems and areas of environmental risk associated with the FMPC. The survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the survey involves the review of existing site environmental data, observations of the operations carried on at FMPC, and interviews with site personnel. The survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its onsite activities. The Sampling and Analysis Plan will be executed by a DOE national laboratory or a support contractor. When completed, the results will be incorporated into the FMPC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the FMPC survey. 41 refs., 20 figs., 25 tabs.

  6. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  7. Risk management research of general contractor of EPC mode%总承包商在EPC总承包模式下的风险管理初探

    Institute of Scientific and Technical Information of China (English)

    陈静纯

    2014-01-01

    Engineering project risk management is the most key factor of the success of the project management. Based on the general contractor, combining about the engineering example and the special natural of EPC mode, the paper discusses the identification and the evaluation of engineering risk management applying the answer of the expert and the scoring of the examine .Lastly, some advise is given to control and survey the risk.%工程项目管理风险是项目管理成败的关键因素。本文从项目总承包商的角度,结合具体工程实例和EPC总承包模式特点,采用专家调查法、调查打分法开展项目管理风险识别与评价,提出风险控制和监测的建议。

  8. Locational Factors and Foreign Market-entry Considerations for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    A.R Abdul_Aziz

    2012-11-01

    Full Text Available Past studies on contractor internationalisation adopt a unimodelapproach. Taking up the call of a few scholars, a study isconducted, this time by integrating several extant models of fi rminternationalisation. Malaysian international contractors are usedto test this approach. Due to space limitation, this paper is focusedonly on locational factors. It begins by justifying the inclusion oflocational factors in a multi-model approach. Then it posits thatlocational disadvantage is a more intellectually appealing conceptthan locational advantages. Empirically, it shows that the surveyedcontractors evaluate a wide range of factors before making thego/no go decision to enter foreign markets. It also shows thatpsychic distance was not their major concern. Finally, the locationaldisadvantages create a market space for international contractorswith the tenacity to overcome them, which the sampled populationpossessed.

  9. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors

    Energy Technology Data Exchange (ETDEWEB)

    Pemberton, S.

    1997-03-01

    One of the tools used in a successful pollution prevention program is a pollution prevention opportunity assessment (PPOA). PPOAs can be used to identify the nature and amounts of waste and energy usage from processes and projects within a site`s operations, identify the opportunities that exist for pollution prevention and energy conservation, and then evaluate those opportunities for feasible implementation. The purpose of this project is to share the Kansas City Plant`s (KCP`s) PPOA methodology and experience with other DOE personnel and DOE contractors. This consisted of three major activities in FY96: (1) completing the PPOA training module specific to Environmental Restoration activities; (2) providing PPOA training and technical assistance to interested DOE personnel and DOE contractors, and (3) implementing and maintaining the DOE-wide PPOA database. This report documents the FY96 efforts, lessons learned, and future plans for all of the PPOA-related activities.

  10. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report

    Energy Technology Data Exchange (ETDEWEB)

    Pemberton, S.

    1996-02-01

    The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project`s objectives in FY95 were to validate DOE`s PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex.

  11. The selection of construction sub-contractors using the fuzzy sets theory

    Energy Technology Data Exchange (ETDEWEB)

    Krzemiński, Michał [Warsaw University of Technology, Faculty of Civil Engineering, Institute of Building Engineering, The Division of Production Engineering and Construction Management, Al. Armii Ludowej 16, 00-637 Warsaw (Poland)

    2015-03-10

    The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set of evaluation criteria, the part of the knowledge base and a description of the output variable.

  12. Strategic Change in a Construction Contractor's Purchasing Organisation and Supplier Relations

    DEFF Research Database (Denmark)

    Koch, Christian; Tambo, Torben

    2010-01-01

    and mixing of competences from engineering and purchasing. Even if the case represents some institutional mimicking of general trends within supply chain management and purchasing, it also exhibit strong adaption to construction project regimes and less ICT and e-business use than would be expected. Adopting......The paper adopts a combined supply chain management and purchasing theory approach to changes in a contractor's purchasing organization and suppliers relations. This is seen to be a complex prolonged change process emerging over long time. The method is qualitative and longitudinal combining ex...... ante studies with ex post elements. As the time frame is ten years a necessary combination of studies with different aims has been done. The case of a major contractor's efforts within supply chain and purchasing exhibits a number of change elements in interaction; new business concepts, processes...

  13. Radiation Exposures for DOE and DOE Contractor Employees - 1990. Twenty-third annual report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M. H. [Pacific Northwest Lab., Richland, WA (United States); Hui, T. E. [Pacific Northwest Lab., Richland, WA (United States); Millet, W. H. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Scholes, V. A. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1993-11-01

    All U.S. Department of Energy and DOE contractors are required by DOE Order 5484.1, Chapter IV, to submit occupational radiation exposure records to a central depository. For 1990, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the total effective dose equivalent, external penetrating whole-body dose equivalent, internal dose equivalent, the shallow dose equivalent, neutron dose equivalent, and extremity dose equivalent. Data regarding the exposed individuals included the individual's age, sex, and occupation category. This report is a summary of data reported by DOE and DOE contractors for the calendar year 1990.

  14. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors

    Energy Technology Data Exchange (ETDEWEB)

    Pemberton, S.

    1995-01-01

    One of the tools used in a successful pollution prevention program is a pollution prevention opportunity assessment (PPOA). The purpose of this project was to share the Kansas City Plant`s (KCP`s) PPOA expertise with other Department of Energy (DOE) personnel and DOE contractors. This consisted of five major activities in FY94: (1) Validating DOE`s PPOA Graded Approach methodology; (2) Providing DOE-funded PPOA training and technical assistance to interested DOE personnel and DOE contractors; (3) Developing a promotional campaign; (4) Conducting a feasibility study to develop a DOE-wide PPOA information exchange mechanism; and (5) Organizing and coordinating information sharing among related DOE EM-334 pollution prevention projects. This report documents the FY94 efforts, lessons learned, and future plans for all of the PPOA-related activities.

  15. The impact of customer-contractor interactions on spacecraft innovation: Insights from communication satellite history

    Science.gov (United States)

    Szajnfarber, Zoe; Stringfellow, Margaret V.; Weigel, Annalisa L.

    2010-11-01

    This paper captures a first detailed attempt to quantitatively analyze the innovation history of the space sector. Building on a communication satellite innovation metric and a spacecraft innovation framework developed as part of an ongoing project, this paper presents a preliminary model of global communication satellite innovation. In addition to innovation being a function of the rate of performance normalized by price, innovation was found to be strongly influenced by characteristics of the customer-contractor contractual relationship. Specifically, Department of Defense contracts tend to result in a lower level of innovation on average as compared to other customers. Also, particular customer-contractor pairs perform differently and exhibit a second order relationship in time.

  16. Defense Contracts: DOD’s Requests for Information from Contractors to Assess Prices

    Science.gov (United States)

    2015-08-01

    reasonableness of prices including reviewing prices paid previously for the same item, market research, or, under certain conditions, an analysis of cost ...unless an exception applies.4 Exceptions to submitting certified cost or pricing data include contracts • based on adequate price competition...Rate Proposal, information from the technical evaluator, and market research.10 • The Navy requested contractor cost data and pricing information for a

  17. Contractor Past Performance Information: An Analysis of Assessment Narratives and Objective Ratings

    Science.gov (United States)

    2015-05-01

    Contractor Past Performance Information: An Analysis of Assessment Narratives and Objective Ratings Rene G. Rendon Uday Apte Michael Dixon...Assessment Narratives and Objective Ratings 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e...associated objective scores • CPARS deficiencies provide less-than-optimal information to the acquisition team that relies on these reports for source

  18. Enabling Operational Reach and Endurance: The Use of Contractors During World War II

    Science.gov (United States)

    2016-05-26

    REPORT NUMBER(SI 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for Public Release; Distribution is Unlimited 13. SUPPLEMENTARY NOTES 14...ABSTRACT The Army’ s force reduction over recent years causes concern due to the continuation of commitments in a complex global environment. The current...Army Operating Concept does not address the use or incorporation of contractors to augment force structure in the event of a militarized response

  19. Is Late or Non-Payment a Significant Problem to Malaysian Contractors?

    Directory of Open Access Journals (Sweden)

    M.E. Che Munaaim

    2007-12-01

    Full Text Available Some developed countries have drawn lip construction-specific statutory security of payment acts/legislations typically known as Construction Contracts Act to eliminate poor payment practices and to assist continuous uninterrupted construction works. Malaysia too cannot pretend not to have these problems. This paper presents findings of a study conducted amongst Malaysian contractors with the aims to determine the seriousness of late and non- payment problems; to identify the main causes and effects of late and non-payment; and to identify ways to sustain the payment flows in the Malaysian construction industry. The study focused on contractual payments from the paymaster (government or private to the contractors. The main factors for late and nonpayment in the construction industry identified from the study include: delay in certification, paymaster's poor financial management, local culture/attitude, pay master's failure to implement good governance in business, underpayment of certified amounts by the pay master and the use of 'pay when paid' clauses in contracts. The research findings show that late and non-payment can create cash flow problems, stress and financial hardship on the contractors. Amongst the most appropriate solutions to overcome the problem of late and non-payment faced by local contractors include: a right to regular periodic payment, a right to a defined time frame (or payment and a right to a speedy dispute resolution mechanism. Promptness of submitting, processing, issuing interim payment certificates and honouring the certificates are extremely important issues in relation to progress payment claims. Perhaps, an increased sense of professionalism in construction industry could overcome some of the problems related to late and non- payment issues.

  20. Radiation exposures for DOE and DOE contractor employees - 1991. Twenty-fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.H.; Hui, T.E. [Pacific Northwest Lab., Richland, WA (United States); Millet, W.H.; Scholes, V.A. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1994-11-01

    This is the 24th annual radiation exposure report published by US DOE and its predecessor agencies. This report summarizes the radiation exposures received by both employees and visitors at DOE and COE contractor facilities during 1991. Trends in radiations exposures are evaluated. The significance of the doses is addressed by comparing them to the DOE limits and by correlating the doses to health risks based on risk estimates from expert groups.