WorldWideScience

Sample records for support team project

  1. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  2. Project team formation support for self-directed learners in social learning networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2012-01-01

    Spoelstra, H., Van Rosmalen, P., & Sloep, P. B. (2012). Project team formation support for self-directed learners in social learning networks. In P. Kommers, P. Isaias, & N. Bessis (Eds.), Proceedings of the IADIS International Conference on Web Based Communities and Social Media (ICWBC & SM 2012)

  3. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  4. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    Directory of Open Access Journals (Sweden)

    Aleksandra Rudawska

    2017-03-01

    Full Text Available Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires. The measures used for the study were developed specifcally for the study referring to the previous research in the feld. Findings: Results indicate that leaders in team projects and conditions supporting teamwork are connected with the students’ perception of teamwork effectiveness, while the fairness in team projects is connected with students’ preference of working collectively. Research implications: We conclude that in order to develop a positive attitude towards teamwork, the teamwork projects should be better supported by the instructors (especially supporting the emergence of leader(s and minimising the problem of free riders and the university should create a climate that facilitates teamworking, otherwise team projects might negatively influence students’ attitude towards collective work. Value: On the labour market the teamwork skills are one of the most important skills of employees, as the team-based organizational designs are becoming the norm in work organization. The study is contributing to the understanding of the relations between student experiences and their attitudes as well as the role played by high education in the development of these attitudes. Some previous research in Anglo-Saxon culture countries indicate that team project assignments realised by students during studies might even hinder their attitudes to teamwork and their willingness to work in teams in the future.

  5. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  6. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  7. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  8. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    OpenAIRE

    Aleksandra Rudawska

    2017-01-01

    Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university) on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires). The measures used f...

  9. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  10. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  11. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  12. CERN's IT Consultancy Team: a new IT project support service

    CERN Multimedia

    Ignacio Reguero, IT Department

    2016-01-01

    Newly created IT Consultancy Team provides advice on IT matters to communities at CERN starting new projects or reviewing computing activities of old.   The members of CERN's IT Consultancy Team. The consultants share their knowledge and experience to improve awareness of the IT landscape at CERN and to advise on system architecture and design to ensure best usage of existing IT services and solutions that favour, and are compatible with, the infrastructure already in place. They also help to formalise requirements and assess impact on security, software licenses and cost, especially where contacts among different services are needed and questions go beyond the current computing service offerings. For instance, the IT consultants may help answering questions like the ones below: We are starting with project X – how could we make its computing aspects compatible with the CERN IT infrastructure? E.g. if you need a web content management system favour Drupal instead of Wor...

  13. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  14. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  15. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  16. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  17. 33 CFR 385.17 - Project Delivery Team.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  18. Defensive behaviours in innovation teams: how project teams discuss defensiveness and its relationship with innovation resilience behaviour and project success

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vuuren, T. van

    2016-01-01

    Project team members and project leaders of innovation projects were interviewed about the possible presence of defensive behaviours within the team. While investigating defensive behaviour can be done validly by observation techniques, to talk about defensiveness within a team often leads to

  19. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  20. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  1. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  2. Team effectiveness in Non-Governmental Organizations (NGOs) projects.

    Science.gov (United States)

    Latif, Khawaja Fawad; Williams, Nigel

    2017-10-01

    The incorporation of team context into research and practice regarding team effectiveness in NGOs projects is a constant challenge. The research seeks to address the gap and identify the critical determinants of team effectiveness in projects undertaken by non-governmental organizations. Using a systematic process, the study involved both literature and focus group discussions to generate the required items. A total of 157 respondents (Team Members and Team Leaders) were part of the study that filled the questionnaires. Using exploratory factor analysis followed by confirmatory factor analysis, both convergent and discriminant validity was established. The present study found that team effectiveness in NGO social projects has a total of seven dimensions namely: Inter team coordination, community social linkage, team performance, knowledge, skills, and attitudes, leadership communication and engagement, decision making and information sharing, and team formation. There is a significant lack of research on team effectiveness in NGO projects. Where considerably large proportion of research on team effectiveness has focused on the corporate sector, the non-governmental teams have been neglected. This study clearly highlights the determinants that make up team effectiveness in NGOs. The determinants identified will help to specifically look at the effectiveness of teams in NGO projects. The study would help NGOs identify the dimensions in which they may be performing in a weaker manner and direct their energies in improving the factors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. The 4th Civil Support Team (Weapons of Mass Destruction)

    International Nuclear Information System (INIS)

    Smith, D. L.

    2007-01-01

    The 4th CST (WMD) is a 22 person joint staffed AGR (Active Guard Reserve) unit of the Georgia National Guard. The team is one of 55 CSTs that are charged with responding to a CBRNE (Chemical, Biological, Radiological, Nuclear, and High Yield Explosive) incident within the United States and its Territories. The mission statements of the CTS is to support civil authorities at a domestic CBRNE incident by identifying CBRNE agents/substances, assessing current and projected consequences, advising on response measures, and assisting with appropriate requests for state support. The team possesses the capability to deploy by sea, air, and land in response to a terrorist attack or natural disaster. The team is comprised of seven officers and fifteen non-commissioned officers who are cross trained in a variety of military disciplines. Equipment assigned to the team includes an Analytical Lab, Communications Suite, Tactical Operations Center, closed and open circuit breathing gear, portable and handheld detectors, and decon support. The CSts are activated through a state's emergency response network.(author)

  4. Peer mentored teams to support undergraduate group work in higher education

    Science.gov (United States)

    Cinderey, Lynn Elizabeth

    This research starts with a set of practical research questions to investigate a problem which occurs in some computing undergraduate modules that use group work as part of the learning and assessment strategy. In this study final year students with experience in information systems project work and trained in team processes met with small groups of first year computing students with the aim of turning the first year project group into a team. This study seeks to explore the experience of the final year students as they take on the role of peer tutor looking at the problems they perceive within the first year teams and the skills and knowledge they use to help them. The study includes the recruitment and training of final year students (n=9) and allocation to first year teams. The final year students acted as co-researchers and team leaders in L4 Information Systems project work and recorded their thoughts and observations in a diary during the first semester of 2008/9 academic year. Diary data was supplemented by interview data from a sample of final year students (n=4). The sample was selected based on the richness of the data provided in the diaries and the number of meetings held with their teams. Rich data and thick descriptions were essential for a phenomenological examination of the experience of the final year students. A number of findings emerged. A critical approach to analysis revealed ongoing conflicts occurred across cultural divides within the first year teams that final year leaders did not articulate or appear fully aware of. This had important implications for individual team members. Other findings which relate to issues of changing levels of motivation in the teams over the ten weeks, roles adopted by the leaders, ability to systematize the project or team processes and the ability to reflect on unsuccessful strategies also had implications for peer mentoring training and support. The picture that emerged from the data suggested that lack of

  5. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  6. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  7. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  8. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  9. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  10. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  11. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  12. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  13. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  14. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  15. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  16. Initial evaluation of the effects of an environmental-focused problem-solving intervention for transition-age young people with developmental disabilities: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica M; Helfrich, Christine; Levin, Melissa; Hwang, I-Ting; Samuel, Preethy S; Carrellas, Ann; Schwartz, Ariel E; Goeva, Aleksandrina; Kolaczyk, Eric D

    2018-03-12

    Project TEAM (Teens making Environment and Activity Modifications) teaches transition-age young people with developmental disabilities, including those with co-occurring intellectual or cognitive disabilities, to identify and resolve environmental barriers to participation. We examined its effects on young people's attainment of participation goals, knowledge, problem-solving, self-determination, and self-efficacy. We used a quasi-experimental, repeated measures design (initial, outcome, 6-week follow-up) with two groups: (1) Project TEAM (28 males, 19 females; mean age 17y 6mo); and (2) goal-setting comparison (21 males, 14 females; mean age 17y 6mo). A matched convenience sample was recruited in two US states. Attainment of participation goals and goal attainment scaling (GAS) T scores were compared at outcome. Differences between groups for all other outcomes were analyzed using linear mixed effects models. At outcome, Project TEAM participants demonstrated greater knowledge (estimated mean difference: 1.82; confidence interval [CI]: 0.90, 2.74) and ability to apply knowledge during participation (GAS: t[75]=4.21; CI: 5.21, 14.57) compared to goal-setting. While both groups achieved significant improvements in knowledge, problem-solving, and self-determination, increases in parent reported self-determination remained at 6-week follow-up only for Project TEAM (estimated mean difference: 4.65; CI: 1.32, 7.98). Significantly more Project TEAM participants attained their participation goals by follow-up (Project TEAM=97.6%, goal-setting=77.1%, p=0.009). Both approaches support attainment of participation goals. Although inconclusive, Project TEAM may uniquely support young people with developmental disabilities to act in a self-determined manner and apply an environmental problem-solving approach over time. Individualized goal-setting, alone or during Project TEAM (Teens making Environment and Activity Modifications) appears to support attainment of participation

  17. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  18. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  19. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  20. Intercultural team maturity model: Unity, diversity, capability. Achieving optimal performance when leading \\ud a multicultural project team

    OpenAIRE

    Prabhakar, G. P.; Walker, S.

    2005-01-01

    Our research helps to judge ‘maturity’ as an asset to projects and heightens awareness of situational leadership, using intercultural team maturity levels as a tool for optimal project leadership success.\\ud \\ud This study focuses on exactly how to analyse the team members’ ability to adapt to complex intercultural project environments, using an intercultural team maturity model.

  1. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  2. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  3. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  4. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    Science.gov (United States)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  5. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  6. Project work on wellbeing in multidisciplinary student teams : A triple testimonial on eps at artesis

    NARCIS (Netherlands)

    Rohaert, S.; Baelus, C.; Lacko, D.

    2012-01-01

    The European Project Semester (EPS) programme offers an educational framework to support students to practice problem-and project-based cross-disciplinary product innovation and research, in small multidisciplinary and international teams. To explore the potential and the restrictions of this

  7. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  8. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  9. Development of an Integrated Team Training Design and Assessment Architecture to Support Adaptability in Healthcare Teams

    Science.gov (United States)

    2017-10-01

    provision of training is not a major focus of this project, trainees were able to practice trauma management skills as well as leadership skills...SUBJECT TERMS Military healthcare team; Trauma teams; Team training; Teamwork; Adaptive performance; Leadership ; Simulation; Modeling; Bayesian belief...ABBREVIATIONS Healthcare team Trauma Trauma teams Team training Teamwork Adaptability Adaptive performance Leadership Simulation Modeling

  10. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  11. State of nutrition support teams.

    Science.gov (United States)

    DeLegge, Mark Henry; Kelly, Andrea True; Kelley, Andrea True

    2013-12-01

    The incidence of malnutrition in hospitalized patients is relatively high (up to 55%) despite breakthroughs in nutrition support therapies. These patients have increased morbidity and mortality, extended hospital stays, and care that is associated with higher costs. These patients are often poorly managed due to inadequate nutrition assessment and poor medical knowledge and practice in the field of nutrition. Nutrition support teams (NSTs) are interdisciplinary support teams with specialty training in nutrition that are often comprised of physicians, dietitians, nurses, and pharmacists. Their role includes nutrition assessment, determination of nutrition needs, recommendations for appropriate nutrition therapy, and management of nutrition support therapy. Studies have demonstrated significant improvements in patient nutrition status and improved clinical outcomes as well as reductions in costs when patients were appropriately managed by a multispecialty NST vs individual caregivers. Despite this, there has been steady decline in the number of formal NST in recent years (65% of hospitals in 1995 to 42% in 2008) as hospitals and other healthcare organizations look for ways to cut costs. Given the importance of nutrition status on clinical outcomes and overall healthcare costs, a number of institutions have introduced and sustained strong nutrition training and support programs and teams, demonstrating both clinical and economic benefit. The benefits of NST, training and implementation strategies, and tips for justifying these clinically and economically beneficial groups to healthcare organizations and governing bodies are discussed in this review.

  12. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  13. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  14. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  15. The Ability–Motivation–Opportunity Framework for Team Innovation: Efficacy Beliefs, Proactive Personalities, Supportive Supervision and Team Innovation

    Directory of Open Access Journals (Sweden)

    Jana Krapež Trošt

    2016-01-01

    Full Text Available Based on ability–motivation–opportunity theoretical framework, the study explores the interplay among team members’ proactive personalities (abilities, collective efficacy (motivation, and supportive supervision (opportunity, and their interaction in predicting team innovation. Multi-level study of 249 employees nested within 64 teams from one German and three Slovenian hi-tech companies showed that collective efficacy was positively related to team innovation. However, the effect of collective efficacy on team innovation was weaker when high levels of supportive supervision and proactivity moderated this relationship. When teams perceived lower levels of collective efficacy, team proactivity, and supportive supervision were more important for achieving higher levels of team innovation as they were when teams perceived lower levels of motivation. We discuss theoretical and practical implications

  16. Environmental control medical support team

    Science.gov (United States)

    Crump, William J.; Kilgore, Melvin V., Jr.

    1988-01-01

    The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.

  17. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  18. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  19. Designing, developing, and deploying systems to support human-robot teams in disaster response

    NARCIS (Netherlands)

    Kruijff, G.J.M.; Kruijff-Korbayová, I.; Keshavdas, S.; Larochelle, B.; Janíček, M.; Colas, F.; Liu, M.; Pomerleau, F.; Siegwart, R.; Neerincx, M.A.; Looije, R.; Smets, N.J.J.M.; Mioch, T.; Diggelen, J. van; Pirri, F.; Gianni, M.; Ferri, F.; Menna, M.; Worst, R.; Linder, T.; Tretyakov, V.; Surmann, H.; Svoboda, T.; Reinštein, M.; Zimmermann, K.; Petříček, T.; Hlaváč, V.

    2014-01-01

    This paper describes our experience in designing, developing and deploying systems for supporting human-robot teams during disaster response. It is based on R&D performed in the EU-funded project NIFTi. NIFTi aimed at building intelligent, collaborative robots that could work together with humans in

  20. Leadership and organizational tenure diversity as determinants of project team effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  1. Leadership and Organizational Tenure Diversity as Determinants of Project Team Effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  2. Problem-Based Service Learning: The Evolution of a Team Project

    Science.gov (United States)

    Connor-Greene, Patricia A.

    2002-01-01

    In this article, I describe the evolution of a problem-based service learning project in an undergraduate Abnormal Psychology course. Students worked in teams on a semester-long project to locate and evaluate information and treatment for specific psychiatric disorders. As part of the project, each team selected relevant bibliographic materials,…

  3. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  4. Network-aware support for mobile distributed teams

    NARCIS (Netherlands)

    Kleij, R. van der; Jong, A. de; Brake, G.M. te; Greefe, T.E.

    2009-01-01

    An experiment evaluated network-aware support to increase understanding of the factors that are important for successful teamwork in mobile geographically dispersed teams of first responders. Participants performed a simulated search and rescue team task and were equipped with a digitized map and

  5. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    Science.gov (United States)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a

  6. Team Research at the Biology-Mathematics Interface: Project Management Perspectives

    Science.gov (United States)

    Milton, John G.; Radunskaya, Ami E.; Lee, Arthur H.; de Pillis, Lisette G.; Bartlett, Diana F.

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics…

  7. Student-Led Project Teams: Significance of Regulation Strategies in High- and Low-Performing Teams

    Science.gov (United States)

    Ainsworth, Judith

    2016-01-01

    We studied group and individual co-regulatory and self-regulatory strategies of self-managed student project teams using data from intragroup peer evaluations and a postproject survey. We found that high team performers shared their research and knowledge with others, collaborated to advise and give constructive criticism, and demonstrated moral…

  8. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    Science.gov (United States)

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  9. Individual autonomy in work teams : the role of team autonomy, self-efficacy, and social support

    NARCIS (Netherlands)

    Mierlo, van H.; Rutte, C.G.; Vermunt, J.K.; Kompier, M.A.J.; Doorewaard, J.A.C.M.

    2006-01-01

    Task autonomy is long recognized as a means to improve functioning of individuals and teams. Taking a multilevel approach, we unravelled the constructs of team and individual autonomy and studied the interplay between team autonomy, self-efficacy, and social support in determining individual

  10. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  11. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  12. Progress report on recommendations of the Flaring Project Team

    International Nuclear Information System (INIS)

    Macken, C.

    1999-01-01

    Part of the mandate of the Clean Air Strategic Alliance (CASA) is to share decision-making responsibility for air quality management with the government of Alberta, through the ministries of Environmental Protection, Energy, and Health, and the Alberta Energy and Utilities Board (EUB). CASA's vision for air quality in Alberta is that 'the air will be odourless, tasteless, look clear, and have no measurable short- or long-term adverse effects on people, animals, or the environment'. In 1997, CASA approved the establishment of the Flaring Project Team in response to public concern about potential and observed impacts associated with flaring of solution gas. Members of that team established a framework for the management of solution gas flaring. Their long-term goal is to eliminate routine flaring of solution gas. The Project Team assessed existing information on solution gas flaring, including technologies, efficiencies, emissions and impacts. Alternative technologies were also reviewed along with biological and health effects of solution gas flaring. A list of data gaps and research needs was compiled in order to help with the development of the Team's recommendations. The Team's final report was delivered in June 1998. It was recommended that the following policy objective hierarchy be used to guide decisions related to routine solution gas flaring: (1) eliminate routine solution gas flaring, (2) reduce volumes of gas flared, and (3) improve the efficiency of flares. By way of progress the Project Team was able to report that in March, 1999, the EUB issued a draft interim directive to address upstream petroleum industry flaring. The draft Directive incorporates the recommendations from the CASA Flaring Project Team with respect to management of solution gas flaring. In December 1998, changes to the royalty structure to encourage the productive use of flare gas have been announced by the Alberta Department of Energy and Alberta Environmental protection, thus

  13. Analysis of Return on Investment in Different Types of Agile Software Development Project Teams

    Directory of Open Access Journals (Sweden)

    Goran MILANOV

    2012-01-01

    Full Text Available This exploratory study of IT project teams in Serbia investigates how the choice of agile methods in different development project teams affects the return-on-investment (ROI. In this paper different types of software project teams are analyzed in order to examine and identify the business-value of using agile methods. In various software development project teams, the ROI of agile methods is yet to be fully explored, while the ROI of traditional methods is well-understood. Since ROI is important indicator of the projects success, in this paper we examine the factors that influence the ROI both from software solution customer point of view, and different agile project teams.

  14. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  15. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    relationship. Foci for future research opportunities include using: a) online data collection methods to improve participant adherence to similarity rating instructions; b) story or narratives during pre- and posttest similarity rating data collection to create common levels of contextual perception; and c) support to ensure charters are integrated into the full project life cycle, not just a pre-project one time isolated activity. Twenty five sections, on average, of EDSGN 100 are taught each spring and fall semester. Consistent instructor expectations are set for the technical aspects of the course. However, ideas to foster team effectiveness are often left to the discretion of the individual instructor. Implementing empirically tested team effectiveness instructional activities would bring consistency to EDGSN 100 curriculum. Other instructional activities that would be of benefit to engineering educators include qualitative inquiry---asking intrateam process questions (at the mid-point of the project) and in-class reflection---dedicated time, post project, to discuss what went well/not well within the team.

  16. The Link Class Project: Collaborative virtual teams between Peru and The Netherlands

    OpenAIRE

    Mariella Olivos Rossini; Sandra Rincón; Anne-Francoise Rutkowski

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the effects of a campus based internationalization strategy supported by the use of technology. Based on previous experiences with virtual classrooms, the authors adhere to the ancient Chinese philosophe...

  17. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  18. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  19. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  20. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  1. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  2. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  3. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  4. Can teams benefit from using a mindful infrastructure when defensive behaviour threatens complex innovation projects?

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vroome, E.M.M. de

    2016-01-01

    Projects are often doomed to fail. An explorative case study which carried out team-based complex innovation projects in a research and technology organisation suggests three main results. 1] Project team leaders experienced that the complexity involved in the various aspects of team functioning,

  5. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  6. Managing Project Team in Local Government B.A. Amujiri Abstract ...

    African Journals Online (AJOL)

    Religion Dept

    government and discovered that managing project team is indispensable in local governments .... subordinate; improve employee motivation; improve communication between .... or events required in completing the project. This will help to.

  7. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    Science.gov (United States)

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  8. Completion of Launch Director Console Project and Other Support Work

    Science.gov (United States)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  9. A Computer Supported Teamwork Project for People with a Visual Impairment.

    Science.gov (United States)

    Hale, Greg

    2000-01-01

    Discussion of the use of computer supported teamwork (CSTW) in team-based organizations focuses on problems that visually impaired people have reading graphical user interface software via screen reader software. Describes a project that successfully used email for CSTW, and suggests issues needing further research. (LRW)

  10. Interview: Mr. Stephen Chee, team leader, UNFPA country support team (CST) for the South Pacific.

    Science.gov (United States)

    1993-09-01

    The UNFPA country support team (CST) for the South Pacific is the action-arm at the regional level of the new Technical Support Services arrangement introduced by the agency. Operational since April 1993, the CST currently covers the following Pacific island countries or territories: the Cook Islands, the Federated States of Micronesia, Fiji, Kiribati, Marshall Islands, Nauru, Niue, Palau, Papua New Guinea, Samoa, Solomon Islands, Tokelau, Tonga, Tuvalu, and Vanuatu. The CST office is located in Suva, Fiji, with the main goal of strengthening national capacity and building self-reliance in the countries of the region. The office in Suva is currently staffed by six highly qualified advisors with extensive experience in the population and related fields; two more advisors are expected to join the Team in early 1994. The Team is well equipped to provide countries and territories of the region with a wide range of technical support services ranging from ad hoc technical advisory services to the conceptualization and development of comprehensive population policies and programs. Services are offered in the areas of basic data collection, processing, and research in population dynamics; population policy formulation, evaluation, and implementation; family planning and maternal-child health; information, education, and communication; women in population and development; and population program management. The team also plays an advocacy role in mainstreaming population concerns into the programs and activities of international, regional, and national organizations. The team leader responds to questions about population problems experienced by the countries served, the scope of UNFPA assistance to country governments in the subregion, the importance of population information in the subregion, and how Asia-Pacific POPIN may help the team and countries served.

  11. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  12. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  13. Specialist Teams Needed to Support Youth.

    Science.gov (United States)

    Mellin, Laurel M.

    1991-01-01

    Presents seven reasons why it is important for health specialist teams to take action supporting the prevention and treatment of childhood obesity. The article offers guidelines to help parents assist their children in maintaining positive eating, exercise, and self-esteem patterns, noting sensitive intervention is preferable to imposed diets. (SM)

  14. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  15. Supporting the Creation and Publication of Reviewed and Tested Teaching Modules through the InTeGrate Project

    Science.gov (United States)

    Bruckner, M. Z.; Birnbaum, S. J.; Bralower, T. J.; Egger, A. E.; Fox, S.; Gosselin, D. C.; Iverson, E. A. R.; Manduca, C. A.; Mcconnell, D. A.; Steer, D. N.; Taber, J. J.

    2016-12-01

    InTeGrate is dedicated to providing robust curricular materials that increase Earth literacy among undergraduate students. As of August 2016, 14 modules that use an interdisciplinary approach to teach about Earth-related sustainability issues across the curriculum have been published, and 19 courses and modules are undergoing final revisions. Materials are designed for undergraduate courses and have been tested in a variety of disciplines including geoscience, engineering, humanities, ethics, and Spanish language courses. The materials were developed, tested, revised, and reviewed using a two-year, highly scaffolded process that involves meeting a series of checkpoints, and is supported by a team of experts who provide guidance and formative feedback throughout the process. A series of webinars also supported teams in the development process. Author teams comprise 3-6 faculty members from at least three different institutions. Authors work collaboratively in a templated webspace designed specifically for creating materials, and representatives from the InTeGrate leadership, assessment, and web teams support each group of authors. This support team provides guidance and feedback on content, pedagogy, and web layout as authors develop materials. Authors attend two face-to-face meetings, one at the beginning of the process and another after materials are piloted in authors' classes. These meetings serve to initially orient authors to the development process, including the rubric that will guide their work, and in making revisions following the piloting phase of the project. Authors report that the meetings also provide professional development experience wherein they learn about pedagogy from each other and team leaders. The bulk of the materials development occurs remotely, with teams meeting regularly via teleconference as they follow the project timeline. All materials undergo review against the Materials Design and Refinement Rubric to ensure they meet project

  16. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  17. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  18. The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance

    Science.gov (United States)

    2016-06-30

    AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT

  19. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  20. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, and various related task spaces, domain activities, decisionmaking activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process...

  1. The uses of an observation team with a parent support group.

    Science.gov (United States)

    O'Brien, P J

    1994-04-01

    This brief report examines the uses of an Observation Team with a Parent Support Group. In particular, attention is placed on the idea of the Observation Team acting as a Reflecting Team in the final session of the group's life. Using the Observation Team in this manner has evolved from an amalgamation of ideas from family therapy and group therapy theory.

  2. [Dream Team--a pre-graduate surgical talent development project].

    Science.gov (United States)

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  3. How Undergraduate Students Use Social Media Technologies to Support Group Project Work

    Science.gov (United States)

    McAliney, Peter J.

    2013-01-01

    Technology continues to evolve and become accessible to students in higher education. Concurrently, teamwork has become an important skill in academia and the workplace and students have adopted established technologies to support their learning in both individual and team project work. Given the emergence of social media technologies, I examined…

  4. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  5. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  6. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  7. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  8. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  9. The programme benefits of improving project team communication through a contact centre

    Directory of Open Access Journals (Sweden)

    Bond-Barnard, T. J.

    2013-08-01

    Full Text Available A South African national programme to repair government infrastructure uses a contact centre (or call centre to facilitate and manage communication. An important question is: How does the contact centre benefit the programme and its projects? This study discusses the findings of a survey that quantified the benefits of the programme when the communication between team members in the programme was improved by using a contact centre. The results show that, by using a contact centre to improve the communication between project team members, their perception of communication effectiveness, quality of project deliverables, service delivery, and customer satisfaction of the programme dramatically increases.

  10. Elicitation Support Requirements of Multi-Expertise Teams

    Science.gov (United States)

    Bitter-Rijpkema, Marlies; Martens, Rob; Jochems, Wim

    2005-01-01

    Tools to support knowledge elicitation are used more and more in situations where employees or students collaborate using the computer. Studies indicate that differences exist between experts and novices regarding their methods of work and reasoning. However, the commonly preferred approach tends to deal with team members as a single system with…

  11. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  12. Creating and supporting a mixed methods health services research team.

    Science.gov (United States)

    Bowers, Barbara; Cohen, Lauren W; Elliot, Amy E; Grabowski, David C; Fishman, Nancy W; Sharkey, Siobhan S; Zimmerman, Sheryl; Horn, Susan D; Kemper, Peter

    2013-12-01

    To use the experience from a health services research evaluation to provide guidance in team development for mixed methods research. The Research Initiative Valuing Eldercare (THRIVE) team was organized by the Robert Wood Johnson Foundation to evaluate The Green House nursing home culture change program. This article describes the development of the research team and provides insights into how funders might engage with mixed methods research teams to maximize the value of the team. Like many mixed methods collaborations, the THRIVE team consisted of researchers from diverse disciplines, embracing diverse methodologies, and operating under a framework of nonhierarchical, shared leadership that required new collaborations, engagement, and commitment in the context of finite resources. Strategies to overcome these potential obstacles and achieve success included implementation of a Coordinating Center, dedicated time for planning and collaborating across researchers and methodologies, funded support for in-person meetings, and creative optimization of resources. Challenges are inevitably present in the formation and operation of effective mixed methods research teams. However, funders and research teams can implement strategies to promote success. © Health Research and Educational Trust.

  13. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  14. An action-learning model to assist Circuit Teams to support School ...

    African Journals Online (AJOL)

    EAOSA

    2016-11-17

    Nov 17, 2016 ... development of both School Management Teams and Circuit Team members. ... achieve excellence in teaching and learning (Department of Basic Education, ... indicate that support to schools, particularly rural and historically disadvantaged schools, ... promote sustainable change and enhanced academic.

  15. A Change in Team Culture Towards an Autonomy Supportive Working Environment - A Case Study of the Finnish Women’s National Ice Hockey Team

    OpenAIRE

    Andler, Martin

    2017-01-01

    This study presents how the change in team culture has impacted the Finnish Women’s National Ice Hockey Team. The structure of the study is based on the self-determination theory, autonomy supportive coaching and change in team culture. The sub chapters’ focus on motivation, the coaches' and athletes' role within the autonomy supportive team working environment, autonomous goal setting and transformational leadership. The subchapter for cultural change is focused on the complex on-going proce...

  16. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  17. When managers and their teams disagree: a longitudinal look at the consequences of differences in perceptions of organizational support.

    Science.gov (United States)

    Bashshur, Michael R; Hernández, Ana; González-Romá, Vicente

    2011-05-01

    The authors argue that over time the difference between team members' perception of the organizational support received by the team (or team climate for organizational support) and their manager's perception of the organizational support received by the team has an effect on important outcomes and emergent states, such as team performance and team positive and negative affect above and beyond the main effects of climate perceptions themselves. With a longitudinal sample of 179 teams at Time 1 and 154 teams at Time 2, the authors tested their predictions using a combined polynomial regression and response surface analyses approach. The results supported the authors' predictions. When team managers and team members' perceptions of organizational support were high and in agreement, outcomes were maximized. When team managers and team members disagreed, team negative affect increased and team performance and team positive affect decreased. The negative effects of disagreement were most amplified when managers perceived that the team received higher levels of support than did the team itself.

  18. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  19. Exploring leadership in self-managed project teams in Malaysia

    Directory of Open Access Journals (Sweden)

    Zaleha Yazid

    2015-01-01

    Full Text Available This paper focuses on a longitudinal approach in exploring leadership in Self-Managed Project Teams (SMPT. SMPT has been known to contribute to organizations by improving productivity and increasing organizational performance. Therefore, understanding the dynamics of leadership in this type of team can be seen as one of the important factors to ensure the success of organizations. Leading a team which manages itself is a challenge as increased autonomy and control is given to the team which eliminates the existence of a leader. It is important to understand the extent of how the external leader is involved within SMPT and whether the external leader approaches highlighted in the literature are applicable in such a situation and how these approaches change during work processes. This study comprises of evidence collected through semi-structured interviews in two small and medium sized organizations in Malaysia. Weekly telephone interviews as well as face-to-face interviews were conducted which provides contextual data for the research. In this research, the evidence suggested that SMPT transform from self-managed toward leader-managed resulting from several factors, such as conflict handling strategies. Specifically, it was found that avoiding conflicts, rather than confronting, transform the team into being leader dependent.

  20. Measuring the influence of a mutual support educational intervention within a nursing team

    Directory of Open Access Journals (Sweden)

    Renée Bridges

    2014-03-01

    Conclusion: The study demonstrates that education can have an impact on perceptions and awareness of mutual support among nursing team members. The survey instrument can be used effectively to inform leadership areas for improvement and staff development in the effort to improve team coordination and mutual support.

  1. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  2. An action-learning model to assist Circuit Teams to support School ...

    African Journals Online (AJOL)

    We report on the construction of a theoretical model to assist Circuit Teams to support School Management Teams of underperforming high schools towards whole-school development in which these improvement plans play a central role. We followed an action research design, employing qualitative data generation and ...

  3. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  4. Exploring the dynamics of formal and informal networks in complex multi-team development projects

    DEFF Research Database (Denmark)

    Kratzer, J.; Gemuenden, H. G.; Lettl, Christopher

    2007-01-01

    The increasing number of complex multi-team projects and the scarcity of knowledge about how to run them successfully, create a need for systematic empirical studies. We attempt to lessen this empirical gap by examining the overlap and structure of formally ascribed design interfaces and informal...... communication networks between participating teams in two complex multi-team projects in the space industry. We study the two projects longitudinally throughout the design and integration phases of product development. There are three major findings. First, formally ascribed design interfaces and informal...... communication networks overlap only marginally. Second, the structure of informal communication remains largely stable in the transition from the design to the integration phase. The third and most intriguing finding is that the weak overlap between formally ascribed design interfaces and the informal...

  5. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  6. Reaping the benefits of task conflict in teams: the critical role of team psychological safety climate.

    Science.gov (United States)

    Bradley, Bret H; Postlethwaite, Bennett E; Klotz, Anthony C; Hamdani, Maria R; Brown, Kenneth G

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance. Using evidence from 117 project teams, the present research found that psychological safety climate moderates the relationship between task conflict and performance. Specifically, task conflict and team performance were positively associated under conditions of high psychological safety. The results support the conclusion that psychological safety facilitates the performance benefits of task conflict in teams. Theoretical implications and suggestions for future research are discussed.

  7. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  8. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  9. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Directory of Open Access Journals (Sweden)

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  10. Cognitive model supported team skill training

    NARCIS (Netherlands)

    Doesburg, W.A. van; Stroomer, S.M.

    2006-01-01

    Complex tasks require coordinated performance by multiple team members. To perform the task effectively each team member must not only master the individual task component but also needs to function in the overall team. To increase team performance, each team member will need to acquire the relevant

  11. Motivating Proteges' Personal Learning in Teams: A Multilevel Investigation of Autonomy Support and Autonomy Orientation

    Science.gov (United States)

    Liu, Dong; Fu, Ping-ping

    2011-01-01

    This study examined the roles of 3 multilevel motivational predictors in proteges' personal learning in teams: an autonomy-supportive team climate, mentors' autonomy support, and proteges' autonomy orientation. The authors followed 305 proteges in 58 teams for 12 weeks and found that all 3 predictors were positively related to the proteges'…

  12. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    Science.gov (United States)

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  13. Enteral nutritional support management in a university teaching hospital: team vs nonteam.

    Science.gov (United States)

    Brown, R O; Carlson, S D; Cowan, G S; Powers, D A; Luther, R W

    1987-01-01

    Current hospital cost containment pressures have prompted a critical evaluation of whether nutritional support teams render more clinically effective and efficient patient care than nonteam management. To address this question with regard to enteral feeding, 102 consecutive hospitalized patients who required enteral nutritional support (ENS) by tube feeding during a 3 1/2-month period were prospectively studied. Fifty patients were managed by a nutritional support team; the other 52 were managed by their primary physicians. Choice of enteral formula, formula modifications, frequency of laboratory tests, and amounts of energy and protein received were recorded daily. In addition, each patient was monitored for pulmonary, mechanical, gastrointestinal, and metabolic abnormalities. Team-managed (T) and nonteam-managed (NT) patients received ENS for 632 and 398 days, respectively. The average time period for ENS was significantly longer in the team-managed patients (12.6 +/- 12.1 days vs 7.7 +/- 6.2 days, p less than 0.01). Significantly more of the team patients attained 1.2 X basal energy expenditure (BEE) (37 vs 26, p less than 0.05). Total number of abnormalities in each group was similar (T = 398, NT = 390); however, the abnormalities per day were significantly lower in the team group (T = 0.63 vs NT = 0.98, p less than 0.01). Mechanical (T = 0.05 vs NT = 0.11, p less than 0.01), gastrointestinal (T = 0.99 vs NT = 0.14, p less than 0.05), and metabolic (T = 0.49 vs NT = 0.72, p less than 0.01) abnormalities per day all were significantly lower in the team-managed patients.(ABSTRACT TRUNCATED AT 250 WORDS)

  14. Nutrition support team management of enterally fed patients in a community hospital is cost-beneficial.

    Science.gov (United States)

    Hassell, J T; Games, A D; Shaffer, B; Harkins, L E

    1994-09-01

    To determine whether nutrition support team (NST) management of enterally fed patients is cost-beneficial and to compare primary outcomes of care between team and nonteam management. A quasi-experimental study was conducted over a 7-month period. A 400-bed community hospital. A convenience sample of 136 subjects who had received enteral nutrition support for at least 24 hours. Forty-two patients died; only their mortality data were used. Ninety-six patients completed the study. Outcomes, including cost, for enterally fed patients in two treatment groups--those managed by the nutrition support team and those managed by nonteam staff--were compared. Severity of illness level was determined for patients managed by the nutrition support team and those managed by nonteam staff. For each group, the following measures were adjusted to reflect a significant difference in average severity of illness and then compared: length of hospital stay, readmission rates, and mortality rates. Complication rates between the groups were also compared. The cost benefit was determined based on savings from the reduction in adjusted length of hospital stay. Parametric and nonparametric statistics were used to evaluate outcomes between the two groups. Differences were statistically significant for both severity of illness, which was at a higher level in the nutrition support team group (P group (P team-managed group, there was a 23% reduction in adjusted mortality rate, an 11.6% reduction in the adjusted length of hospital stay, and a 43% reduction in adjusted readmission rate. Cost-benefit analysis revealed that for every $1 invested in nutrition support team management, a benefit of $4.20 was realized. Financial and humanitarian benefits are associated with nutrition support team management of enterally fed hospitalized patients.

  15. Project TEAMS (Talking about Eating, Activity, and Mutual Support: a randomized controlled trial of a theory-based weight loss program for couples

    Directory of Open Access Journals (Sweden)

    Amy A. Gorin

    2017-09-01

    Full Text Available Abstract Background Obesity risk is shared between spouses, yet existing weight loss programs focus on individuals and not the marital dyad. Given the interdependence of weight in couples, weight management outcomes might be improved by targeting joint weight loss and the creation of an interpersonal milieu that supports long-term behavior change. According to Self-Determination Theory (SDT, greater autonomous self-regulation of behaviors, and subsequently better treatment outcomes, are observed in needs supportive environments in which personally meaningful choice is supported and criticism and control are minimized. Correlational analyses confirm these pathways in weight management, with needs support from one’s spouse or partner emerging as a distinct predictor of weight loss success. Research is now needed to establish causal links and to develop and test weight loss interventions designed to facilitate the needs supportive behavior of spouses. Methods Project TEAMS (Talking about Eating, Activity, and Mutual Support is a randomized controlled trial testing a couples-based intervention, grounded in SDT, designed to change the social context of weight loss by training spouses to provide needs support for each other’s eating and physical activity behavior. Sixty-four couples will be randomized to either 6 months of behavioral weight loss treatment informed by SDT (SDT-WL or to 6 months of standard behavioral weight loss treatment (BWL. Couples will attend weekly sessions for 6 months and will be assessed at 0, 3, 6, and 12 months. By bolstering needs support, SDT-WL is predicted to increase autonomous self-regulation and perceived competence and produce greater weight loss and maintenance than standard behavioral treatment. Exploratory analyses will examine the SDT process model prediction that the influence of needs support on treatment outcomes will be mediated by autonomous self-regulation and perceived competence. Discussion This

  16. Project TEAMS (Talking about Eating, Activity, and Mutual Support): a randomized controlled trial of a theory-based weight loss program for couples.

    Science.gov (United States)

    Gorin, Amy A; Powers, Theodore A; Gettens, Katelyn; Cornelius, Talea; Koestner, Richard; Mobley, Amy R; Pescatello, Linda; Medina, Tania Huedo

    2017-09-29

    Obesity risk is shared between spouses, yet existing weight loss programs focus on individuals and not the marital dyad. Given the interdependence of weight in couples, weight management outcomes might be improved by targeting joint weight loss and the creation of an interpersonal milieu that supports long-term behavior change. According to Self-Determination Theory (SDT), greater autonomous self-regulation of behaviors, and subsequently better treatment outcomes, are observed in needs supportive environments in which personally meaningful choice is supported and criticism and control are minimized. Correlational analyses confirm these pathways in weight management, with needs support from one's spouse or partner emerging as a distinct predictor of weight loss success. Research is now needed to establish causal links and to develop and test weight loss interventions designed to facilitate the needs supportive behavior of spouses. Project TEAMS (Talking about Eating, Activity, and Mutual Support) is a randomized controlled trial testing a couples-based intervention, grounded in SDT, designed to change the social context of weight loss by training spouses to provide needs support for each other's eating and physical activity behavior. Sixty-four couples will be randomized to either 6 months of behavioral weight loss treatment informed by SDT (SDT-WL) or to 6 months of standard behavioral weight loss treatment (BWL). Couples will attend weekly sessions for 6 months and will be assessed at 0, 3, 6, and 12 months. By bolstering needs support, SDT-WL is predicted to increase autonomous self-regulation and perceived competence and produce greater weight loss and maintenance than standard behavioral treatment. Exploratory analyses will examine the SDT process model prediction that the influence of needs support on treatment outcomes will be mediated by autonomous self-regulation and perceived competence. This study addresses the fundamental importance of interpersonal

  17. A Team Formation Framework for Managing Diversity in Multidisciplinary Engineering Project

    Directory of Open Access Journals (Sweden)

    Shawqi Mohammed Hossain

    2017-02-01

    Full Text Available Team formation is one of the essential elements in constructing effective teamwork of any team size that requires different skill sets. Diversity in team encourages students to challenge and compete with one another while searching for new ideas, which in turn can lead to a better team performance. In a well-functioning diverse teams, the students who performed poorly may gain benefit by observing how excellent students approach the assignments. They may also benefit by getting advice and assistance from the excellent students. Studies have shown that Malaysian university graduates lack of team skills. The purpose of this paper is to propose a framework for forming a diverse multidisciplinary team among engineering undergraduates based on selected criteria such as individual personality type, gender, and other relevant demographic information. The proposed framework can also be used to design an automated team-formation system based on the identified metrics. The purpose of the framework is to consolidate the existing team formation literature, and to develop and test interventions for maximizing individual member and team performance as a whole that makes an effective team. For this study, a multidisciplinary approach was used where first year engineering students from three different faculties, namely Faculty of Electrical Engineering (FKE, Faculty of Mechanical Engineering (FKM, and Faculty of Biosciences and Medical Engineering (FBME at Universiti Teknologi Malaysia (UTM worked on an innovation project using the Conceive, Design, Implement, and Operate (CDIO framework. Keirsey Temperament Sorter was used as an instrument to identify an individual's personality type.

  18. Virtual Teams and Knowledge Communication

    DEFF Research Database (Denmark)

    Lehtonen, Miikka; Kampf, Constance Elizabeth

    2014-01-01

    How does culture affect virtual teams and the knowledge communication processes in which they engage? As virtual spaces are increasingly used to support teams and establish collaboration in cross-cultural projects, the notion of cross-cultural communication can be understood as shifting from...... contextual perspective to a semiotic perspective. That is to say, although the team members are using the same vocabulary they might attach different meanings to and have different knowledge about them thus highlighting the importance of approaching virtual teams and collaboration from a semiotic perspective....... To look at how knowledge about virtual work is established in a multinational context, we interviewed members of a team that connects Finland and India. Results reveal five objects shared between the team members with varying knowledge about them. By making these differences in knowledge visible through...

  19. Team collaborative innovation management based on primary pipes automatic welding project

    International Nuclear Information System (INIS)

    Li Jing; Wang Dong; Zhang Ke

    2012-01-01

    The welding quality of primary pipe directly affects the safe operation of nuclear power plants. Primary pipe automatic welding, first of its kind in China, is a complex systematic project involving many facets, such as design, manufacturing, material, and on-site construction. A R and D team was formed by China Guangdong Nuclear Power Engineering Co., Ltd. (CNPEC) together with other domestic nuclear power design institutes, and manufacturing and construction enterprises. According to the characteristics of nuclear power plant construction, and adopting team collaborative innovation management mode, through project co-ordination, resources allocation and building production, education and research collaborative innovation platform, CNPEC successfully developed the primary pipe automatic welding technique which has been widely applied to the construction of nuclear power plant, creating considerable economic benefits. (authors)

  20. Are real teams healthy teams?

    NARCIS (Netherlands)

    Buljac, M.; van Woerkom, M.; van Wijngaarden, P.

    2013-01-01

    This study examines the impact of real-team--as opposed to a team in name only--characteristics (i.e., team boundaries, stability of membership, and task interdependence) on team processes (i.e., team learning and emotional support) and team effectiveness in the long-term care sector. We employed a

  1. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams.

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-04-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader's verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time.

  2. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-01-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader’s verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time. PMID:28490856

  3. Project Leader's Dual Socialization and Its Impact on Team Learning and Performance: A Diagnostic Study

    Science.gov (United States)

    Gautam, Tanvi

    2009-01-01

    One of the important challenges for leadership in project teams is the ability to manage the knowledge, communication and coordination related activities of team. In cross-team collaboration, different boundaries contribute to the situated nature of knowledge and hamper the flow of knowledge and prevent shared understanding with those on the other…

  4. Questioning in Distributed Product Development Teams: Supporting Shared Understanding

    DEFF Research Database (Denmark)

    Cash, Philip; Ahmed-Kristensen, Saeema

    2015-01-01

    globally distributed NPD activities. Poor shared understanding can ultimately result in delays and rework. One major antecedent of shared understanding development is question asking. This work uses a quasiexperimental study to test the impact of questioning support on different types of distributed teams...

  5. Technology as Teammate: Examining the Role of External Cognition in Support of Team Cognitive Processes.

    Science.gov (United States)

    Fiore, Stephen M; Wiltshire, Travis J

    2016-01-01

    In this paper we advance team theory by describing how cognition occurs across the distribution of members and the artifacts and technology that support their efforts. We draw from complementary theorizing coming out of cognitive engineering and cognitive science that views forms of cognition as external and extended and integrate this with theorizing on macrocognition in teams. Two frameworks are described that provide the groundwork for advancing theory and aid in the development of more precise measures for understanding team cognition via focus on artifacts and the technologies supporting their development and use. This includes distinctions between teamwork and taskwork and the notion of general and specific competencies from the organizational sciences along with the concepts of offloading and scaffolding from the cognitive sciences. This paper contributes to the team cognition literature along multiple lines. First, it aids theory development by synthesizing a broad set of perspectives on the varied forms of cognition emerging in complex collaborative contexts. Second, it supports research by providing diagnostic guidelines to study how artifacts are related to team cognition. Finally, it supports information systems designers by more precisely describing how to conceptualize team-supporting technology and artifacts. As such, it provides a means to more richly understand process and performance as it occurs within sociotechnical systems. Our overarching objective is to show how team cognition can both be more clearly conceptualized and more precisely measured by integrating theory from cognitive engineering and the cognitive and organizational sciences.

  6. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  7. Balancing creativity and time efficiency in multi-team R&D projects: The alignment of formal and informal networks

    DEFF Research Database (Denmark)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    and their effect on the challenge to balance project creativity and time efficiency. In order to analyse this issue data in two multi-team R&D projects in space industry are collected. There are two intriguing findings that are partly contradicting the state-of-the art knowledge. First, formally ascribed design...... with the team's creativity, whereas it negatively impacts the team's time efficiency....

  8. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  9. A Customized Workflow-Driven Instant Messaging System Support Team Communication in the Hospital.

    Science.gov (United States)

    Lee, Ying-Li; Chien, Tsai-Feng; Chen, Hsiu-Chin

    2016-01-01

    Effective communication among the healthcare team is a very important skill to support team resource management (TRM). However, we take too much effort to connect with other team members by using traditional telephone communication. In this study, we developed an instant messaging system embedded in the original hospital information system and evaluated the preliminary outcome and the usage of the system.

  10. NASA technology applications team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.

  11. A THEORETICAL MODEL OF SOCIO-PSYCHOLOGICAL SUPPORT WORK PROCESSES FOR MANAGEMENT OF PRODUCTION TEAM

    Directory of Open Access Journals (Sweden)

    Tatyana Gennadevna Pronyushkina

    2015-10-01

    Full Text Available This article discusses the management of production team, in particular the developed theoretical model of socio-psychological support work processes for management of production team. The author of the research are formulated the purpose and objectives of social-psychological work on management of the production team. Developed in the study a theoretical model aimed at determining the conditions and the identification of features of effective management of the enterprise taking into account the socio-psychological characteristics of its staff. Tasks include: definition of the main characteristics of the production team and their severity, the analysis of these characteristics and identifying opportunities for their transformation, development of recommendations for management of social-psychological work on effects on the characteristics of the collective enterprise.Practical study of the activities of a number of businesses have shown the need to improve socio-psychological support of management processes production team: introducing a social and psychological planning team and develop the practice of sociological research on the state of the team, to ensure the smoothing of relations between workers and management through periodic meetings, creations of conditions for feedback, maintaining healthy competition among team members.

  12. Building Project Management Communities: Exploring the Contribution of Patterns Supported by Web 2.0 Technologies

    Science.gov (United States)

    Burd, Elizabeth L.; Hatch, Andrew; Ashurst, Colin; Jessop, Alan

    2009-01-01

    This article describes an approach whereby patterns are used to describe management issues and solutions to be used during the project management of team-based software development. The work describes how web 2.0 technologies have been employed to support the use and development of such patterns. To evaluate the success of patterns and the…

  13. Study on the action guidelines for medical support team for nuclear and radiological emergency

    International Nuclear Information System (INIS)

    Liu Chang'an; Liu Ying; Geng Xiusheng

    2006-01-01

    Objective: To study the action guidelines for medical support team for nuclear and radiological emergency. Methods: It is based on the experience and lessons learned in the course of meeting the emergencies preparedness and response of nuclear and radiological emergencies in China and abroad with the reference of the relevant reports of International Atomic Energy Agency. Results: Essential requirements and practical recommendations for the roles, responsibilities, emergency preparedness, principles and procedures of medical assistance at the scene, as well as the radiological protection of medical support team were provided. Conclusion: The document mentioned above can be applied to direct the establishment, effective medical preparedness and response of the medical support team for nuclear and radiological emergency. (authors)

  14. The Behavior Intervention Support Team (BIST) Program: Underlying Theories

    Science.gov (United States)

    Boulden, Walter T.

    2010-01-01

    The Behavior Intervention Support Team (BIST) is a proactive school-wide behavior management plan for all students, emphasizing schools partnering with students and parents through caring relationships and high expectations. The BIST program is well-grounded in behavioral theory and combines strength-based and resiliency principles within the…

  15. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  16. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  17. Improving Care Teams' Functioning: Recommendations from Team Science.

    Science.gov (United States)

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  18. Green shoots of recovery: a realist evaluation of a team to support change in general practice.

    Science.gov (United States)

    Bartlett, Maggie; Basten, Ruth; McKinley, Robert K

    2017-02-08

    A multidisciplinary support team for general practice was established in April 2014 by a local National Health Service (NHS) England management team. This work evaluates the team's effectiveness in supporting and promoting change in its first 2 years, using realist methodology. Primary care in one area of England. Semistructured interviews were conducted with staff from 14 practices, 3 key senior NHS England personnel and 5 members of the support team. Sampling of practice staff was purposive to include representatives from relevant professional groups. The team worked with practices to identify areas for change, construct action plans and implement them. While there was no specified timescale for the team's work with practices, it was tailored to each. In realist evaluations, outcomes are contingent on mechanisms acting in contexts, and both an understanding of how an intervention leads to change in a socially constructed system and the resultant changes are outcomes. The principal positive mechanisms leading to change were the support team's expertise and its relationships with practice staff. The 'external view' provided by the team via its corroborative and normalising effects was an important mechanism for increasing morale in some practice contexts. A powerful negative mechanism was related to perceptions of 'being seen as a failing practice' which included expressions of 'shame'. Outcomes for practices as perceived by their staff were better communication, improvements in patients' access to appointments resulting from better clinical and managerial skill mix, and improvements in workload management. The support team promoted change within practices leading to signs of the 'green shoots of recovery' within the time frame of the evaluation. Such interventions need to be tailored and responsive to practices' needs. The team's expertise and relationships between team members and practice staff are central to success. Published by the BMJ Publishing Group

  19. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  20. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  1. Supported Discharge Teams for older people in hospital acute care: a randomised controlled trial.

    Science.gov (United States)

    Parsons, Matthew; Parsons, John; Rouse, Paul; Pillai, Avinesh; Mathieson, Sean; Parsons, Rochelle; Smith, Christine; Kenealy, Tim

    2018-03-01

    Supported Discharge Teams aim to help with the transition from hospital to home, whilst reducing hospital length-of-stay. Despite their obvious attraction, the evidence remains mixed, ranging from strong support for disease-specific interventions to less favourable results for generic services. To determine whether older people referred to a Supported Discharge Team have: (i) reduced length-of-stay in hospital; (ii) reduced risk of hospital readmission; and (iii) reduced healthcare costs. Randomised controlled trial with follow-up to 6 months; 103 older women and 80 men (n = 183) (mean age 79), in hospital, were randomised to receive either Supported Discharge Team or usual care. Home-based rehabilitation was delivered by trained Health Care Assistants up to four times a day, 7 days a week, under the guidance of registered nurses, allied health and geriatricians for up to 6 weeks. Participants randomised to the Supported Discharge Team spent less time in hospital during the index admission (mean 15.7 days) in comparison to usual care (mean 21.6 days) (mean difference 5.9: 95% CI 0.6, 11.3 days: P = 0.03) and spent less time in hospital in the 6 months following discharge home. Supported discharge group costs were calculated at mean NZ$10,836 (SD NZ$12,087) compared to NZ$16,943 (SD NZ$22,303) in usual care. A Supported Discharge Team can provide an effective means of discharging older people home early from hospital and can make a cost-effective contribution to managing increasing demand for hospital beds. © The Author 2017. Published by Oxford University Press on behalf of the British Geriatrics Society.All rights reserved. For permissions, please email: journals.permissions@oup.com

  2. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    OpenAIRE

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  3. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  4. Complex approach in telecommunication engineering education: develop engineering skills by a team project

    Directory of Open Access Journals (Sweden)

    Scripcariu Luminița

    2017-01-01

    Full Text Available This paper provides an overview of the educational process of telecommunication engineering students by presenting the preparation of a team project focused on information security. Our educational approach combines basic knowledge such as mathematics with specialized engineering notions and various skills. The project theme is to design, implement and test an encryption algorithm. Students are provided with online courses, specific software programs and Internet access. They have to choose an encryption algorithm, to study its details and to write the script of the encryption algorithm in MATLAB program. The algorithm is implemented in C/C++ programming language and tested. Finally, a concurrent team tries to break the algorithm by finding the decryption key. It is an interactive approach which combines various education methods including gaming concepts. The covered topics provide students professional outcomes such as knowledge and use of specific mathematical tools and software environments (C/C ++ programming languages, MATLAB, abilities to design, develop, implement and test software algorithms. The project also provides transversal outcomes such as ability to team work, skills of computer use and information technology and capability to take responsibilities. Creativity is also encouraged by extending the algorithm to other encryption key lengths than the usual ones.

  5. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  6. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  7. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  8. Understanding and Supporting Dynamic Capabilities of Design Teams in Production of Technology-Innovation

    DEFF Research Database (Denmark)

    Jensen, Ole Kjeldal

    Rapid adaptation to a changing environment is essential for the survival of incumbent companies, but the capabilities required to lead the disruption of a technological trajectory are generally challenged by the process management activities that make the company operate efficiently within its...... current environment. This study explores the practices of engineering designers that are executing disruptive innovation projects for DONG Energy, a Danish energy utilities company. The aim of the study was to understand the role of the designer in disruptive innovation and to create a tool for supporting...... multidisciplinary design teams, while creating disruptive innovations. The results from this study are presented in five research Papers that address the following themes: 1) the willingness of engineers to follow formal procedures, 2) critical knowledge domains in front-end technology decisions, 3) knowledge...

  9. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  10. An Information Technology Tool to Support Negotiating Teams

    Directory of Open Access Journals (Sweden)

    Jose Montanana

    1995-05-01

    Full Text Available This paper discusses computer-supported large-scale negotiation, in particular, negotiation with advisers. It is claimed that better communication within negotiating teams should lead to longer, more productive sessions than the current ones. To this end, an information technology environment should be provided for the negotiation. The paper introduces SHINE, a collaborative software system developed at the University of Chile. This software has many features to allow rich interactions among advisers belonging to the same team, among negotiators and also between a negotiator and his advisers. Emphasis is placed on the design features to enable and ease these interactions. The facilities include WYSIWIS windows, enhanced electronic mail to send and receive text or video messages with several urgency levels, an evaluation procedure and various ways to state comments and ideas. SHINE has been implemented as a prototype on Sun Sparc workstations.

  11. Development of the REFOCUS intervention to increase mental health team support for personal recovery.

    Science.gov (United States)

    Slade, Mike; Bird, Victoria; Le Boutillier, Clair; Farkas, Marianne; Grey, Barbara; Larsen, John; Leamy, Mary; Oades, Lindsay; Williams, Julie

    2015-12-01

    There is an emerging evidence base about best practice in supporting recovery. This is usually framed in relation to general principles, and specific pro-recovery interventions are lacking. To develop a theoretically based and empirically defensible new pro-recovery manualised intervention--called the REFOCUS intervention. Seven systematic and two narrative reviews were undertaken. Identified evidence gaps were addressed in three qualitative studies. The findings were synthesised to produce the REFOCUS intervention, manual and model. The REFOCUS intervention comprises two components: recovery-promoting relationships and working practices. Approaches to supporting relationships comprise coaching skills training for staff, developing a shared team understanding of recovery, exploring staff values, a Partnership Project with people who use the service and raising patient expectations. Working practices comprise the following: understanding values and treatment preferences; assessing strengths; and supporting goal-striving. The REFOCUS model describes the causal pathway from the REFOCUS intervention to improved recovery. The REFOCUS intervention is an empirically supported pro-recovery intervention for use in mental health services. It will be evaluated in a multisite cluster randomised controlled trial (ISRCTN02507940). © The Royal College of Psychiatrists 2015.

  12. Effectiveness of intervention with a perioperative multidisciplinary support team for radical esophagectomy.

    Science.gov (United States)

    Akiyama, Yuji; Iwaya, Takeshi; Endo, Fumitaka; Shioi, Yoshihiro; Kumagai, Motoi; Takahara, Takeshi; Otsuka, Koki; Nitta, Hiroyuki; Koeda, Keisuke; Mizuno, Masaru; Kimura, Yusuke; Suzuki, Kenji; Sasaki, Akira

    2017-12-01

    We aimed to evaluate the effectiveness of intervention by a perioperative multidisciplinary support team for radical esophagectomy for esophageal cancer. We retrospectively reviewed 85 consecutive patients with esophageal cancer who underwent radical esophagectomy via right thoracotomy or thoracoscopic surgery with gastric tube reconstruction. Twenty-one patients were enrolled in the non-intervention group (group N) from May 2011 to September 2012, 31 patients in the perioperative rehabilitation group (group R) from October 2012 to April 2014, and 33 patients in the multidisciplinary support team group (group S) from May 2014 to September 2015. Morbidity rates were 38, 45.2, and 42.4% for groups N, R, and S, respectively. Although there were no significant differences in the incidence of pneumonia among the groups, the durations of fever and C-reactive protein positivity were shorter in group S. Moreover, postoperative oral intake commenced earlier [5.9 (5-8) days] and postoperative hospital stay was shorter [19.6 (13-29) days] for group S. The intervention by a perioperative multidisciplinary support team for radical esophagectomy was effective in preventing the progression and prolongation of pneumonia as well as earlier ambulation, oral feeding, and shortening of postoperative hospitalization.

  13. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  14. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  15. Nutritional support team vs nonteam management of enteral nutritional support in a Veterans Administration Medical Center teaching hospital.

    Science.gov (United States)

    Powers, D A; Brown, R O; Cowan, G S; Luther, R W; Sutherland, D A; Drexler, P G

    1986-01-01

    One hundred one patients receiving enteral nutritional support (ENS) by tube feeding during a 5-month period were prospectively studied. Fifty patients were managed by a nutritional support team (T) and 51 patients were managed by the nonteam approach (NT). Demographics, primary diagnosis, chronic diseases, medical service, calculated basal energy expenditure (BEE), duration of ENS, and final patient disposition were recorded. Enteral formula, formula modifications, results of laboratory tests and calories delivered were obtained daily. Results of nitrogen balance studies were obtained when available and each patient was monitored for pulmonary, mechanical, gastrointestinal, and metabolic abnormalities. No significant difference was found between the team and nonteam managed groups in regard to total feeding days, mean feeding days per patient, total laboratory tests, laboratory tests per patient or laboratory tests per day. Significantly more team patients attained 1.2 times BEE (T = 47, NT = 38, p less than 0.05) for a significantly greater period of time (T = 398 days, NT = 281 days, p less than 0.05). Significantly more team patients achieved a measured positive nitrogen balance than nonteam patients (T = 42, NT = 1, p less than 0.05). Formula modifications to correct nutritional or metabolic aberrations were made in 15 (30%) team patients and five (9.8%) nonteam patients (p less than 0.05). The number of individual abnormalities (pulmonary, mechanical, gastrointestinal, and metabolic), as well as total abnormalities occurring in the team-managed group, was significantly lower than in the nonteam managed group (160 vs 695, p less than 0.05).(ABSTRACT TRUNCATED AT 250 WORDS)

  16. Impact of a comprehensive supportive care team on management of hopelessly ill patients with multiple organ failure.

    Science.gov (United States)

    Field, B E; Devich, L E; Carlson, R W

    1989-08-01

    We developed a supportive care team for hopelessly ill patients in an urban emergency/trauma hospital. The team includes a clinical nurse specialist and a faculty physician as well as a chaplain and social worker. The supportive care team provides an alternative to intensive care or conventional ward management of hopelessly ill patients and concentrates on the physical and psychosocial comfort needs of patients and their families. We describe our experience with 20 hopelessly ill patients with multiple organ failure vs a similar group treated before the development of the supportive care team. Although there was no difference in mortality (100 percent), the length of stay in the medical ICU for patients with multiple organ failure decreased by 12 days to 6 days. Additionally, there were 50 percent fewer therapeutic interventions provided by the supportive care team vs intensive care or conventional ward treatment of multiple organ failure patients. We describe the methods that the supportive care team uses in an attempt to meet the physical and psychosocial comfort needs of hopelessly ill multiple organ failure patients and their families. This multidisciplinary approach to the care of the hopelessly ill may have applications in other institutions facing the ethical, medical, and administrative challenges raised by these patients.

  17. Team Building OD Interventions and Outcomes in a Public School.

    Science.gov (United States)

    Patterson, Wade N.; DeVille, Anthony P.

    This paper describes a study of an organization development intervention with an eight-person teaching-support-administrative team in a suburban elementary school. Data for the study were gathered through observation by two participant-observers, through interviews with all eight direct participants in the team-building project, and through a…

  18. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  19. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  20. The link class project : Collaborative virtual teams between Peru and The Netherlands

    NARCIS (Netherlands)

    Olivos Rossini, L.M.; Rincon, Sandra; Rutkowski, Anne-Francoise

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the

  1. A methodology for system-of-systems design in support of the engineering team

    Science.gov (United States)

    Ridolfi, G.; Mooij, E.; Cardile, D.; Corpino, S.; Ferrari, G.

    2012-04-01

    Space missions have experienced a trend of increasing complexity in the last decades, resulting in the design of very complex systems formed by many elements and sub-elements working together to meet the requirements. In a classical approach, especially in a company environment, the two steps of design-space exploration and optimization are usually performed by experts inferring on major phenomena, making assumptions and doing some trial-and-error runs on the available mathematical models. This is done especially in the very early design phases where most of the costs are locked-in. With the objective of supporting the engineering team and the decision-makers during the design of complex systems, the authors developed a modelling framework for a particular category of complex, coupled space systems called System-of-Systems. Once modelled, the System-of-Systems is solved using a computationally cheap parametric methodology, named the mixed-hypercube approach, based on the utilization of a particular type of fractional factorial design-of-experiments, and analysis of the results via global sensitivity analysis and response surfaces. As an applicative example, a system-of-systems of a hypothetical human space exploration scenario for the support of a manned lunar base is presented. The results demonstrate that using the mixed-hypercube to sample the design space, an optimal solution is reached with a limited computational effort, providing support to the engineering team and decision makers thanks to sensitivity and robustness information. The analysis of the system-of-systems model that was implemented shows that the logistic support of a human outpost on the Moon for 15 years is still feasible with currently available launcher classes. The results presented in this paper have been obtained in cooperation with Thales Alenia Space—Italy, in the framework of a regional programme called STEPS. STEPS—Sistemi e Tecnologie per l'EsPlorazione Spaziale is a research

  2. Supporting Distributed Team Working in 3D Virtual Worlds: A Case Study in Second Life

    Science.gov (United States)

    Minocha, Shailey; Morse, David R.

    2010-01-01

    Purpose: The purpose of this paper is to report on a study into how a three-dimensional (3D) virtual world (Second Life) can facilitate socialisation and team working among students working on a team project at a distance. This models the situation in many commercial sectors where work is increasingly being conducted across time zones and between…

  3. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  4. Quality charters or quality members? A control theory perspective on team charters and team performance.

    Science.gov (United States)

    Courtright, Stephen H; McCormick, Brian W; Mistry, Sal; Wang, Jiexin

    2017-10-01

    Though prevalent in practice, team charters have only recently received scholarly attention. However, most of this work has been relatively devoid of theory, and consequently, key questions about why and under what conditions team charter quality affects team performance remain unanswered. To address these gaps, we draw on macro organizational control theory to propose that team charter quality serves as a team-level "behavior" control mechanism that builds task cohesion through a structured exercise. We then juxtapose team charter quality with an "input" team control mechanism that influences the emergence of task cohesion more organically: team conscientiousness. Given their redundant effects on task cohesion, we propose that the effects of team charter quality and team conscientiousness on team performance (through task cohesion) are substitutive such that team charter quality primarily impacts team performance for teams that are low (vs. high) on conscientiousness. We test and find support for our hypotheses in a sample of 239 undergraduate self-managing project teams. Our study contributes to the groups and teams literature in the following ways: first, relative to previous studies, we take a more theory-driven approach toward understanding team charters, and in doing so, uncover when and why team charter quality impacts team performance; second, we integrate two normally disparate perspectives on team effectiveness (team development and team selection) to offer a broader perspective on how teams are "built"; and third, we introduce team charter quality as a performance-enhancing mechanism for teams lower on conscientiousness. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  5. Librarians as Part of Cross-Disciplinary, Multi-Institutional Team Projects: Experiences from the VIVO Collaboration

    Science.gov (United States)

    Garcia-Milian, Rolando; Norton, Hannah F.; Auten, Beth; Davis, Valrie I.; Holmes, Kristi L.; Johnson, Margeaux; Tennant, Michele R.

    2013-01-01

    Cross-disciplinary, team-based collaboration is essential for addressing today’s complex research questions, and librarians are increasingly entering into such collaborations. This study identifies skills needed as librarians integrate into cross-disciplinary teams, based on the experiences of librarians involved in the development and implementation of VIVO, a research discovery and collaboration platform. Participants discussed the challenges, skills gained, and lessons learned throughout the project. Their responses were analyzed in the light of the science of team science literature, and factors affecting collaboration on the VIVO team were identified. Skills in inclusive thinking, communication, perseverance, adaptability, and leadership were found to be essential. PMID:23833333

  6. The importance of trust in virtual team knowledge mediation

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    For transnational companies, virtual project teams are a means of overcoming temporal, geographical and organizational boundaries between team members. However, because the level of knowledge communication has been shown to be influenced by trust (e.g. Staples & Webster 2008; Quigley, Tesluk, Locke......, and will examine how the corporate context, consisting of embedded cultures, corporate structures and orgamizational communities of practice (CoP) support relationships, identity, trust and knowledge communication. According to the literature review on virtual teams conducted by Martins, Gilson & Maynard (2004...

  7. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  8. Factors Affecting Process Innovation Teams’ Learning and Their Impact on the Success of the Process Innovation Projects

    Directory of Open Access Journals (Sweden)

    İbrahim H. Seyrek

    2007-06-01

    Full Text Available Based on 145 process innovation teams, we have studied factors supporting team learning and their impact on the success of the process innovation projects. As a result, we have found that team vision, recording and reviewing project related information, filing, following a structural development process and co-location of team members are factors supporting team learning and project success. Also, two dimensions of learning, information acquisition and information implementation, are positively related to the success of the process innovation projects

  9. Data Management Supporting the U.S. Extended Continental Shelf Project

    Science.gov (United States)

    Lim, E.; Henderson, J. F.; Warnken, R.; McLean, S. J.; Varner, J. D.; Mcquinn, E.; LaRocque, J.

    2013-12-01

    The U.S. Extended Continental Shelf (ECS) Project is a multi-agency collaboration led by the U.S. Department of State whose mission is to establish the full extent of the continental shelf of the United States consistent with international law. Since 2003, the U.S. has been actively collecting bathymetric, seismic, and other geophysical data and geologic samples required to delineate its outer limits in accordance with Article 76 of the UN Convention on the Law of the Sea. In 2007, the U.S. ECS Task Force designated the National Geophysical Data Center (NGDC) to serve as both the Data Management lead and the Data Archive and Integration Center for the U.S. ECS Project. NGDC, one of three National Oceanic and Atmospheric Administration (NOAA) Offices active in the ECS Project, has the primary responsibility to provide a common infrastructure and a means to integrate the data supporting, and products resulting from ECS analysis. One of the key challenges in the ECS project is the requirement to track the provenance of data and derived products. Final ECS analyses may result in hundreds of points that define a new maritime boundary that is our extended continental shelf. These points will be developed in a rigorous process of analysis encompassing potentially thousands of raw datasets and derived products. NGDC has spent the past two years planning, designing, and partially implementing the Information Management System (IMS), a highly functional, interactive software system that serves as the master database for the ECS Project. The purpose of this geospatial database is to archive, access, and manage the primary data, derivative data and products, associated metadata, information and decisions that will form the U.S. submission. The IMS enables team members to manage ECS data in a consistent way while maintaining institutional memory and the rationale behind decisions. The IMS contains two major components: First, a catalog that acts as the interface to the IMS by

  10. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  11. Enhancing Mathematical Communication for Virtual Math Teams

    Directory of Open Access Journals (Sweden)

    Gerry Stahl

    2010-06-01

    Full Text Available The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies the online math discourse that takes place during sessions of virtual math teams working on open-ended problem-solving tasks. In particular, it investigates methods of group cognition that are employed by teams in this setting. The VMT environment currently integrates social networking, synchronous text chat, a shared whiteboard for drawing, web browsers and an asynchronous wiki for exchanging findings within the larger community. A simple version of MathML is supported in the whiteboard, chat and wiki for displaying mathematical expressions. The VMT Project is currently integrating the dynamic mathematics application, GeoGebra, into its collaboration environment. This will create a multi-user version of GeoGebra, which can be used in concert with the chat, web browsers, curricular topics and wiki repository.

  12. From words to action: visibility of management in supporting interdisciplinary team working in an acute rehabilitative geriatric hospital.

    Science.gov (United States)

    Buttigieg, Sandra C; Cassar, Vincent; Scully, Judy W

    2013-01-01

    The following case study aims to explore management's, health professionals' and patients' experiences on the extent to which there is visibility of management support in achieving effective interdisciplinary team working, which is explicitly declared in the mission statement of a 60-bed acute rehabilitative geriatric hospital in Malta. A total of 21 semi-structured interviews were conducted with the above-mentioned key stakeholders. Three main distinct yet interdependent themes emerged as a result of thematic analysis: "managing a team-friendly hospital", "interdisciplinary team components", and "interdisciplinary team processes". The findings show that visibility of management support and its alignment with the process and content levels of interdisciplinary teamwork are key to integrated care for acute rehabilitative geriatric patients. The emerging phenomena may not be reproducible in a different context; although many of the emerging themes could be comfortably matched with the existing literature. The implications are geared towards raising the consciousness and conscientiousness of good practice in interdisciplinary teamwork in hospitals, as well as in emphasizing organizational and management support as crucial factors for team-based organizations. Interdisciplinary teamwork in acute rehabilitative geriatrics provides optimal quality and integrated health care delivery with the aim that the older persons are successfully discharged back to the community. The authors draw on solid theoretical frameworks--the complexity theory, team effectiveness model and the social identity theory--to support their major finding, namely the alignment of organizational and management support with intra-team factors at the process and content level.

  13. Are project managers ready for the 21th challenges? A review of problem structuring methods for decision support

    Directory of Open Access Journals (Sweden)

    José Mateo

    2017-01-01

    Full Text Available Numerous contemporary problems that project managers face today can be considered as unstructured decision problems characterized by multiple actors and perspectives, incommensurable and/or conflicting objectives, and important intangibles. This work environment demands that project managers possess not only hard skills but also soft skills with the ability to take a management perspective and, above all, develop real leadership capabilities. In this paper, a family of problem structured methods for decision support aimed at assisting project managers in tackling complex problems are presented. Problem structured methods are a family of soft operations research methods for decision support that assist groups of diverse composition to agree a problem focus and make commitments to consequential action. Project management programs are challenged to implement these methodologies in such a way that it is organized around the key competences that a project manager needs in order to be more effective, work efficiently as members of interdisciplinary teams and successfully execute even a small project.

  14. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Directory of Open Access Journals (Sweden)

    Núria Rovira-Asenjo

    Full Text Available Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering. So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4-5 members. Each team was headed by either a female or male leader, so that 45 leaders (33% women supervised 258 team members (39% women. Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders' self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration. While we did not find any gender differences in leaders' self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders.

  15. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Science.gov (United States)

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  16. Effects of interdependencies in project teams

    NARCIS (Netherlands)

    Van der Vegt, G.S.; Emans, B.J.M.; Van de Vliert, E.

    The associations between task interdependence, outcome interdependence, and the effectiveness of team members were examined. The sample consisted of 181 employees at 10 engineering companies in The Netherlands. The participants evaluated their interdependence with 1 specific team member and rated

  17. Improving motivation and engagement in core engineering courses with student teams

    Science.gov (United States)

    Trenshaw, Kathryn Faye

    Team-based projects are common in capstone engineering design courses and increasingly common in first-year engineering programs. Despite high enrollments and budget cutbacks affecting many programs, second- and third-year students can also benefit from team-based project experiences, which motivate them to succeed in engineering and prepare them for a globally competitive workforce. My dissertation research demonstrates that team design projects can be incorporated into the curricula of engineering departments, and these projects result in positive affective outcomes for students. Using ABET outcomes and Self Determination Theory (SDT) as the background for my studies, I investigated students' confidence, motivation, and sense of community after experiencing team design projects in two different engineering departments at a large public institution. In the first study, I used a sequential mixed methods approach with a primary quantitative phase followed by an explanatory qualitative phase to evaluate a chemical engineering program that integrated team design projects throughout the curriculum. The evaluation methods included a survey based on desired ABET outcomes for students and focus groups to expand on the quantitative results. Students reported increased confidence in their design, teamwork, and communication skills after completing the projects. In my second and third studies, I used qualitative interviews based on SDT to explore student motivation in an electrical and computer engineering course redesigned to support students' intrinsic motivation to learn. SDT states that intrinsic motivation to learn is supported by increasing students' sense of autonomy, competence, and relatedness in regard to their learning. Using both narrative inquiry and phenomenological methodologies, I analyzed data from interviews of students for mentions of autonomy, competence, and relatedness as well as course events that were critical in changing students' motivation

  18. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  19. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  20. Effective Team Support: From Task and Cognitive Modeling to Software Agents for Time-Critical Complex Work Environments

    Science.gov (United States)

    Remington, Roger W. (Technical Monitor); John, Bonnie E.; Sycara, Katia

    2005-01-01

    The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in completing a system for empirical data collection, cognitive modeling, and the building of software agents to support a team's tasks, and in running experiments for the collection of baseline data.

  1. Team Effectiveness and Team Development in CSCL

    Science.gov (United States)

    Fransen, Jos; Weinberger, Armin; Kirschner, Paul A.

    2013-01-01

    There is a wealth of research on computer-supported cooperative work (CSCW) that is neglected in computer-supported collaborative learning (CSCL) research. CSCW research is concerned with contextual factors, however, that may strongly influence collaborative learning processes as well, such as task characteristics, team formation, team members'…

  2. Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams

    NARCIS (Netherlands)

    Rusman, Ellen; Van Bruggen, Jan; Sloep, Peter; Valcke, Martin; Koper, Rob

    2010-01-01

    Rusman, E., Van Bruggen, J., Sloep, P. B., Valcke, M., & Koper, R. (2012). Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams. International Journal of Information Technology Project Management (IJITPM), 3(1), 15-35.

  3. Beautiful Teams Inspiring and Cautionary Tales from Veteran Team Leaders

    CERN Document Server

    Stellman, Andrew

    2009-01-01

    What's it like to work on a great software development team facing an impossible problem? How do you build an effective team? Beautiful Teams takes you behind the scenes with some of the most interesting teams in software engineering history. You'll learn from veteran team leaders' successes and failures, told through a series of engaging personal stories -- and interviews -- by leading programmers, architects, project managers, and thought leaders.

  4. Advanced Life Support Project Plan

    Science.gov (United States)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  5. Electronic health record tools' support of nurses' clinical judgment and team communication.

    Science.gov (United States)

    Kossman, Susan P; Bonney, Leigh Ann; Kim, Myoung Jin

    2013-11-01

    Nurses need to quickly process information to form clinical judgments, communicate with the healthcare team, and guide optimal patient care. Electronic health records not only offer potential for enhanced care but also introduce unintended consequences through changes in workflow, clinical judgment, and communication. We investigated nurses' use of improvised (self-made) and electronic health record-generated cognitive artifacts on clinical judgment and team communication. Tanner's Clinical Judgment Model provided a framework and basis for questions in an online survey and focus group interviews. Findings indicated that (1) nurses rated self-made work lists and medication administration records highest for both clinical judgment and communication, (2) tools aided different dimensions of clinical judgment, and (3) interdisciplinary tools enhance team communication. Implications are that electronic health record tool redesign could better support nursing work.

  6. One step ahead of technology Cern and HP - an ideal team project

    CERN Multimedia

    Garvey, Kelsey

    2009-01-01

    "In 2004, the It team at Cern recognized the comprehensiveness and future of the LHC Computing Grid Project and realized that the IT infrastructures were not sufficient enough to manage the data. Cern therefore partnered with HP ProCurve the following year to minimize the day-to-day workload and improve infrastructure for data output" (1 page)

  7. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  8. Teams as innovative systems: multilevel motivational antecedents of innovation in R&D teams.

    Science.gov (United States)

    Chen, Gilad; Farh, Jiing-Lih; Campbell-Bush, Elizabeth M; Wu, Zhiming; Wu, Xin

    2013-11-01

    Integrating theories of proactive motivation, team innovation climate, and motivation in teams, we developed and tested a multilevel model of motivators of innovative performance in teams. Analyses of multisource data from 428 members of 95 research and development (R&D) teams across 33 Chinese firms indicated that team-level support for innovation climate captured motivational mechanisms that mediated between transformational leadership and team innovative performance, whereas members' motivational states (role-breadth self-efficacy and intrinsic motivation) mediated between proactive personality and individual innovative performance. Furthermore, individual motivational states and team support for innovation climate uniquely promoted individual innovative performance, and, in turn, individual innovative performance linked team support for innovation climate to team innovative performance. (c) 2013 APA, all rights reserved.

  9. Conceptualization and Support of the Role of Teachers Serving as Team Leaders in a Professional Learning Community

    Science.gov (United States)

    Gordin, Lanelle

    2010-01-01

    This study presents the results of a phenomenological qualitative investigation into the new role of teachers serving as team leaders in a professional learning community, as well as the support team leaders need from members and principals to be effective. Collaborative teacher teams in 6 schools that have been developing as professional learning…

  10. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  11. Team cohesion and team success in sport.

    Science.gov (United States)

    Carron, Albert V; Bray, Steven R; Eys, Mark A

    2002-02-01

    The main aim of this study was to examine the relationship between task cohesiveness and team success in elite teams using composite team estimates of cohesion. A secondary aim was to determine statistically the consistency (i.e. 'groupness') present in team members' perceptions of cohesion. Elite university basketball teams (n = 18) and club soccer teams (n = 9) were assessed for cohesiveness and winning percentages. Measures were recorded towards the end of each team's competitive season. Our results indicate that cohesiveness is a shared perception, thereby providing statistical support for the use of composite team scores. Further analyses indicated a strong relationship between cohesion and success (r = 0.55-0.67). Further research using multi-level statistical techniques is recommended.

  12. Identifying the Types of Support Needed by Interprofessional Teams Providing Pediatric End-of-Life Care: A Thematic Analysis.

    Science.gov (United States)

    Riotte, Clare O; Kukora, Stephanie K; Keefer, Patricia M; Firn, Janice I

    2018-04-01

    Despite the number of interprofessional team members caring for children at the end of life, little evidence exists on how institutions can support their staff in providing care in these situations. We sought to evaluate which aspects of the hospital work environment were most helpful for multidisciplinary team members who care for patients at the end of life and identify areas for improvement to better address staff needs. Qualitative thematic analysis was completed of free-text comments from a survey distributed to interprofessional staff members involved in the care of a recently deceased pediatric patient. A total of 2701 surveys were sent; 890 completed. Free-text responses were provided by 306 interprofessional team members. Interprofessional team members involved in the care of a child who died at a 348 bed academic children's hospital in the Midwestern United States. Realist thematic analysis of free-text responses was completed in Dedoose using a deductive and inductive approach with line-by-line coding. Descriptive statistics of demographic information was completed using Excel. Thematic analysis of the 306 free-text responses identified three main support-related themes. Interprofessional team members desire to have (1) support through educational efforts such as workshops, (2) support from colleagues, and (3) support through institutional practices. Providers who participate in end-of-life work benefit from ongoing support through education, interpersonal relationships, and institutional practices. Addressing these areas from an interprofessional perspective enables staff to provide the optimal care for patients, patients' families, and themselves.

  13. Making star teams out of star players.

    Science.gov (United States)

    Mankins, Michael; Bird, Alan; Root, James

    2013-01-01

    Top talent is an invaluable asset: In highly specialized or creative work, for instance, "A" players are likely to be six times as productive as "B" players. So when your company has a crucial strategic project, why not multiply all that firepower and have a team of your best performers tackle it? Yet many companies hesitate to do this, believing that all-star teams don't work: Big egos will get in the way. The stars won't be able to work with one another. They'll drive the team Leader crazy. Mankins, Bird, and Root of Bain & Company believe it's time to set aside that thinking. They have seen all-star teams do extraordinary work. But there is a right way and a wrong way to organize them. Before you can even begin to assemble such a team, you need to have the right talent management practices, so you hire and develop the best people and know what they're capable of. You have to give the team appropriate incentives and leaders and support staffers who are stars in their own right. And projects that are ill-defined or small scale are not for all-star teams. Use them only for critical missions, and make sure their objectives are clear. Even with the right setup, things can still go wrong. The wise executive will take steps to manage egos, prune non-team-players, and prevent average coworkers from feeling completely undervalued. She will also invest a lot of time in choosing the right team Leader and will ask members for lots of feedback to monitor how that leader is doing.

  14. Tinkering self-efficacy and team interaction on freshman engineering design teams

    Science.gov (United States)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition

  15. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  16. Learning to Argue with Intermediate Macro Theory: A Semester-Long Team Writing Project

    Science.gov (United States)

    Strasser, Georg; Wolfe, Marketa Halova

    2014-01-01

    The authors describe their experience with integrating a semester-long economic analysis project into an intermediate macroeconomic theory course. Students work in teams of "economic advisors" to write a series of nested reports that analyze the current state of the economy, and propose and evaluate policies for a decision-maker. The…

  17. White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Paul T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bass, Bennett Richard [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-09-01

    ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the

  18. Incorporating Virtually Immersive Environments as a Collaborative Medium for Virtual Teaming

    Directory of Open Access Journals (Sweden)

    Charles J. Lesko, Jr.

    2012-08-01

    Full Text Available Virtually immersive environments incorporate the use of various computer modelling and simulation techniques enabling geographically dispersed virtual project teams to interact within an artificially projected three-dimensional space online. This study focused on adoption of virtually immersive technologies as a collaborative media to support virtual teaming of both graduate and undergraduate-level project management students. The data and information from this study has implications for educators using virtually immersive environments in the classroom. In this study, we specifically evaluated two key components in this paper: 1 students’ level of trust and; 2 students’ willingness to use the technology, along with their belief about the virtual environment’s ability to extend and improve knowledge sharing in their team work environment. We learned that while students did find the environment a positive add on for working collaboratively, there were students who were neither more nor less likely to use the technology for future collaborative ventures. Most of the students who were not very positive about the environment were “fence sitters” likely indicating needs related to additional training to improve communication skills. Finally, based on the full study results we have provided basic recommendations designed to support team trust building in the system along with interpersonal trust building to facilitate knowledge transfer and better strategic us of the technology.

  19. Understanding Soccer Team Supporters' Behavior and Culture in a Globalized Society from Social Learning Theory

    Science.gov (United States)

    Lee, Seungbum; Han, Keunsu

    2012-01-01

    Whereas there have been many academic studies on European soccer team supporters, relatively few studies have looked at supporters in Asia, especially regarding their supporting behavior and culture. Broadly, the purpose of this paper is to describe the behavior and culture of supporters of the Korean professional soccer league (K-League).…

  20. Teams make it work: how team work engagement mediates between social resources and performance in teams.

    Science.gov (United States)

    Torrente, Pedro; Salanova, Marisa; Llorens, Susana; Schaufeli, Wilmar B

    2012-02-01

    In this study we analyze the mediating role of team work engagement between team social resources (i.e., supportive team climate, coordination, teamwork), and team performance (i.e., in-role and extra-role performance) as predicted by the Job Demands-Resources Model. Aggregated data of 533 employees nested within 62 teams and 13 organizations were used, whereas team performance was assessed by supervisor ratings. Structural equation modeling revealed that, as expected, team work engagement plays a mediating role between social resources perceived at the team level and team performance as assessed by the supervisor.

  1. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  2. An interdisciplinary team communication framework and its application to healthcare 'e-teams' systems design.

    Science.gov (United States)

    Kuziemsky, Craig E; Borycki, Elizabeth M; Purkis, Mary Ellen; Black, Fraser; Boyle, Michael; Cloutier-Fisher, Denise; Fox, Lee Ann; MacKenzie, Patricia; Syme, Ann; Tschanz, Coby; Wainwright, Wendy; Wong, Helen

    2009-09-15

    There are few studies that examine the processes that interdisciplinary teams engage in and how we can design health information systems (HIS) to support those team processes. This was an exploratory study with two purposes: (1) To develop a framework for interdisciplinary team communication based on structures, processes and outcomes that were identified as having occurred during weekly team meetings. (2) To use the framework to guide 'e-teams' HIS design to support interdisciplinary team meeting communication. An ethnographic approach was used to collect data on two interdisciplinary teams. Qualitative content analysis was used to analyze the data according to structures, processes and outcomes. We present details for team meta-concepts of structures, processes and outcomes and the concepts and sub concepts within each meta-concept. We also provide an exploratory framework for interdisciplinary team communication and describe how the framework can guide HIS design to support 'e-teams'. The structures, processes and outcomes that describe interdisciplinary teams are complex and often occur in a non-linear fashion. Electronic data support, process facilitation and team video conferencing are three HIS tools that can enhance team function.

  3. An interdisciplinary team communication framework and its application to healthcare 'e-teams' systems design

    Directory of Open Access Journals (Sweden)

    MacKenzie Patricia

    2009-09-01

    Full Text Available Abstract Background There are few studies that examine the processes that interdisciplinary teams engage in and how we can design health information systems (HIS to support those team processes. This was an exploratory study with two purposes: (1 To develop a framework for interdisciplinary team communication based on structures, processes and outcomes that were identified as having occurred during weekly team meetings. (2 To use the framework to guide 'e-teams' HIS design to support interdisciplinary team meeting communication. Methods An ethnographic approach was used to collect data on two interdisciplinary teams. Qualitative content analysis was used to analyze the data according to structures, processes and outcomes. Results We present details for team meta-concepts of structures, processes and outcomes and the concepts and sub concepts within each meta-concept. We also provide an exploratory framework for interdisciplinary team communication and describe how the framework can guide HIS design to support 'e-teams'. Conclusion The structures, processes and outcomes that describe interdisciplinary teams are complex and often occur in a non-linear fashion. Electronic data support, process facilitation and team video conferencing are three HIS tools that can enhance team function.

  4. Interactions of the NAEG information support project with other projects

    International Nuclear Information System (INIS)

    Pfuderer, H.A.

    1976-01-01

    In the past year the Information Support Project to the Nevada Applied Ecology Group has interacted with many other research projects on the transuranics and other radionuclides. Group interactions through symposiums, workshops, and responding to search requests have proven to be mutually beneficial. The NAEG Information Support Project will draw on the information resources of the Oak Ridge National Laboratory to produce a bibliography of the radionuclides (other than the transuranics) of interest to the Nevada Test Site

  5. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  6. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  7. Team role stress : relationships with team learning and performance in project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Gevers, J.M.P.; Heijden, van der B.I.J.M.; Poell, R.F.

    2012-01-01

    Although role stress literature has almost exclusively focused on individual role incumbents, it is conceivable that shared conditions of ambiguity, conflict, and quantitative or qualitative overload may give rise to a collective experience of role stress in teams. Testing a multilevel mediation

  8. Nuclear Nonproliferation Ontology Assessment Team Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strasburg, Jana D.; Hohimer, Ryan E.

    2012-01-01

    Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

  9. The effects of team reflexivity on psychological well-being in manufacturing teams.

    Science.gov (United States)

    Chen, Jingqiu; Bamberger, Peter A; Song, Yifan; Vashdi, Dana R

    2018-04-01

    While the impact of team reflexivity (a.k.a. after-event-reviews, team debriefs) on team performance has been widely examined, we know little about its implications on other team outcomes such as member well-being. Drawing from prior team reflexivity research, we propose that reflexivity-related team processes reduce demands, and enhance control and support. Given the centrality of these factors to work-based strain, we posit that team reflexivity, by affecting these factors, may have beneficial implications on 3 core dimensions of employee burnout, namely exhaustion, cynicism, and inefficacy (reduced personal accomplishment). Using a sample of 469 unskilled manufacturing workers employed in 73 production teams in a Southern Chinese factory, we implemented a time lagged, quasi-field experiment, with half of the teams trained in and executing an end-of-shift team debriefing, and the other half assigned to a control condition and undergoing periodic postshift team-building exercises. Our findings largely supported our hypotheses, demonstrating that relative to team members assigned to the control condition, those assigned to the reflexivity condition experienced a significant improvement in all 3 burnout dimensions over time. These effects were mediated by control and support (but not demands) and amplified as a function of team longevity. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  10. Sensemaking in the formation of basic life support teams

    DEFF Research Database (Denmark)

    Hallas, Peter; Lauridsen, Johnny; Brabrand, Mikkel

    2018-01-01

    well known in organizational studies. It refers to the collaborative effort among members in a dialogue to create meaning in an ambiguous situation, often by using subtle variations in the sentences in the dialogue. Sentences with high degrees of "sensemaking" activity can be thematized as "co......-orientation", "re-presentation" and/or "subordination" (among others). We sought to establish if elements of "sensemaking" occur in the formation of in-hospital cardiac arrest teams. METHODS: Videos of ten simulations of unannounced in-hospital cardiac arrests treated by basic life support (BLS) providers. We...

  11. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  12. A Case Study in Competitive Technical and Market Intelligence Support and Lessons Learned for the uChemLab LDRD Grand Challenge Project; TOPICAL

    International Nuclear Information System (INIS)

    SOUTHWELL, EDWIN T.; GARCIA, MARIE L.; MEYERS, CHARLES E.

    2001-01-01

    The(mu)ChemLab(trademark) Laboratory Directed Research and Development (LDRD) Grand Challenge project began in October 1996 and ended in September 2000. The technical managers of the(mu)ChemLab(trademark) project and the LDRD office, with the support of a consultant, conducted a competitive technical and market demand intelligence analysis of the(mu)ChemLab(trademark). The managers used this knowledge to make project decisions and course adjustments. CTI/MDI positively impacted the project's technology development, uncovered potential technology partnerships, and supported eventual industry partner contacts. CTI/MDI analysis is now seen as due diligence and the(mu)ChemLab(trademark) project is now the model for other Sandia LDRD Grand Challenge undertakings. This document describes the CTI/MDI analysis and captures the more important ''lessons learned'' of this Grand Challenge project, as reported by the project's management team

  13. Team sport and coaching - a dynamic interplay supporting development of self-concept

    DEFF Research Database (Denmark)

    Ryom, Knud Eske; Wikman, Johan Michael; Stelter, Reinhard

    2018-01-01

    The purpose of this study was to investigate the effect and experience of a team sport and coaching intervention upon self-concept in a sample of male school students with primarily migrant background. A convergent parallel mixed method design was used to compare and relate a questionnaire study ...... and more supportive social environment, as the result of their participation. Implications of the presented results are discussed, as well as strategies for working with team sport and coaching in a school setting in deprived areas or beyond.......The purpose of this study was to investigate the effect and experience of a team sport and coaching intervention upon self-concept in a sample of male school students with primarily migrant background. A convergent parallel mixed method design was used to compare and relate a questionnaire study...... (SDQ-II & YSEQ) and an interview study in a quasi-experimental design. A two-year intervention period was conducted with students in 7th, 8th and 9th grade. The interventions were a two-stringed effort with team sport and group coaching introduced to the participants. Quantitative results showed...

  14. Integration, Configuration and Coordination: from Project to Reality, at CERN

    CERN Document Server

    Barberan Marin, Maria; Bernardini, Marzia; Birtwistle, Thomas; Chemli, Samy; Corso, Jean-Pierre; Coupard, Julie; Foraz, Katy; Grillot, Serge; Muttoni, Yvon; Perrot, Anne-Laure

    2016-01-01

    The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.

  15. Paradoxes in virtual team knowledge communication and trust building

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    This thesis proposal presents paradoxes within current trust and knowledge management literatures as a lens for understanding challenges in virtual teams working across organisational and geographic boundaries. By exposing contradictions within current virtual team research, the author proposes...... a need for a different, multi-level, multi-theoretical approach to virtual team research in order to overcome the paradoxes. A moderate constructionist research position building on Critical Realism is proposed. To situate the project within current literatures, trust, knowledge management and virtual...... team literatures are reviewed. These are used to support the paradoxes used as a lens for understanding. A research design is presented building on interviews, documentary analysis and observations analysed using Social Network Analysis and James Gee’s framework for discourse analysis. Finally...

  16. Developing Your Dream Team

    Science.gov (United States)

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  17. The Motivated Project Team

    Science.gov (United States)

    2009-12-01

    Financial incentives that match level of achievement • Regular, constructive feedback. Hierarchy of Needs ( Abraham H. Maslow ) Team members can be...Much has been written regarding motivational Defense AT&L: November-December 2009 58 theory . To further complicate mat- ters, some motivational... theories clearly contradict others, and a manager’s ability to motivate is, to no small degree, related to his or her leadership approach and inter

  18. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  19. Interprofessional education and social interaction: The use of automated external defibrillators in team-based basic life support.

    Science.gov (United States)

    Onan, Arif; Simsek, Nurettin

    2017-04-01

    Automated external defibrillators are pervasive computing devices designed for the treatment and management of acute sudden cardiac arrest. This study aims to explain users' actual use behavior in teams formed by different professions taken after a short time span of interaction with automated external defibrillator. Before the intervention, all the participants were certified with the American Heart Association Basic Life Support for healthcare providers. A statistically significant difference was revealed in mean individual automated external defibrillator technical skills between uniprofessional and interprofessional groups. The technical automated external defibrillator team scores were greater for groups with interprofessional than for those with uniprofessional education. The nontechnical automated external defibrillator skills of interprofessional and uniprofessional teams revealed differences in advantage of interprofessional teams. Students positively accept automated external defibrillators if well-defined and validated training opportunities to use them expertly are available. Uniprofessional teams were successfully supported by their members and, thereby, used automated external defibrillator effectively. Furthermore, the interprofessional approach resulted in as much effective teamwork as the uniprofessional approach.

  20. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  1. Cheap Talk: “Team Factors and Management Practices Influence on Team Trust”

    OpenAIRE

    Doris Padmini Selvaratnam; Aini Aman; Muhamad Maziz Mahyuddin Bin Kamaludin; Gary Lynn; Richard Reilly

    2016-01-01

    Team trust has been cited as a contributing factor towards team performance. This paper looks at the antecedents of team trust and to what extent they influence team trust. The antecedents of team trust are team factors like team autonomy, team stability and team member experience; and the management practices are top management involvement and management support. The results demonstrated that team factors and management practices influence team trust individually. The key find...

  2. Team-client Relationships And Extreme Programming

    Directory of Open Access Journals (Sweden)

    John Karn

    2008-01-01

    Full Text Available This paper describes a study that examined the relationship between software engineering teams who adhered to the extreme programming (XP methodology and their project clients. The study involved observing teams working on projects for clients who had commissioned a piece of software to be used in the real world. Interviews were conducted during and at the end of the project to get client opinion on how the project had progressed. Of interest to the researchers were opinions on frequency of feedback, how the team captured requirements, whether or not the iterative approach of XP proved to be helpful, and the level of contextual and software engineering knowledge the client had at the start of the project. In theory, fidelity to XP should result in enhanced communication, reduce expectation gaps, and lead to greater client satisfaction. Our results suggest that this depends heavily on the communication skills of the team and of the client, the expectations of the client, and the nature of the project.

  3. Institutional support for projects development

    International Nuclear Information System (INIS)

    Tobar, Carlos

    2000-01-01

    The paper describes the institutional support to develop projects on renewable energy, also describes the different ways to obtain financial support from the public sector and the interaction among private sector, universities and non governmental agencies in training, research and generation of energy

  4. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  5. Exploring Social Structures in Extended Team Model

    DEFF Research Database (Denmark)

    Zahedi, Mansooreh; Ali Babar, Muhammad

    2013-01-01

    Extended Team Model (ETM) as a type of offshore outsourcing is increasingly becoming popular mode of Global Software Development (GSD). There is little knowledge about the social structures in ETM and their impact on collaboration. Within a large interdisciplinary project to develop the next...... generation of GSD technologies, we are exploring the role of social structures to support collaboration. This paper reports some details of our research design and initial findings about the mechanisms to support social structures and their impact on collaboration in an ETM....

  6. Structuring Effective Student Teams.

    Science.gov (United States)

    Dickson, Ellen L.

    1997-01-01

    Experience with student teams working on policy analysis projects indicates the need for faculty supervision of teams in the process of addressing complex issues. The problem-solving approach adopted in one policy analysis course is described, including assignments and tasks, issues and sponsors, team dynamics, conflict management, and the…

  7. Engineering Technical Support Center Annual Report Fiscal ...

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  8. Communications tools in research projects to support Semi and Non Structured Information

    Directory of Open Access Journals (Sweden)

    Astrid Jaime

    2005-06-01

    Full Text Available Innovation and thus the production of knowledge becomes a factor of competitiveness. In this context quality management could be complemented by knowledge management to aim the improvement of knowledge production by research activities process. To this end, after describing knowledge and informa-tion typologies in engineering activities, a knowledge man-agement system is proposed. The goal is to support: (1 Semi-Structured Information (e.g. reports, etc. thanks to the BASIC-Lab tool functions, which are based on attributing points of view and annotations to documents and document zones, and (2 Non-Structured Information (such as mail, dialogues, etc., thanks to MICA-Graph approach which intends to support ex-change of technical messages that concerns common resolution of research problems within project teams and to capitalise relevant knowledge. For the both approaches, prototype tools have been developed and evaluated, primarily to feed back with manufacturing knowledge in the EADS industrial envi-ronment.

  9. Working toward resilience: a retrospective report of actions taken in support of a New York school crisis team following 9/11.

    Science.gov (United States)

    Johnson, Kendall; Luna, Joanne M Tortorici

    2011-01-01

    A retrospective report details external support rendered to a Lower Manhattan school crisis team following the 9/11/01 terrorist attack on the World Trade Center This analysis occasions an opportunity for consideration of working assumptions, the formative use of data to plan support actions, and the subsequent emergence of a collaborative approach to post-disaster team support in school settings. The nature of assessment and nature of subsequent service delivery illustrates a community resilience-based approach to school crisis management. Recommendations for such work are based upon mixed qualitative and quantitative data gathered from on-scene team members as part of the ongoing support effort.

  10. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  11. Improving Video Game Development: Facilitating Heterogeneous Team Collaboration through Flexible Software Processes

    Science.gov (United States)

    Musil, Juergen; Schweda, Angelika; Winkler, Dietmar; Biffl, Stefan

    Based on our observations of Austrian video game software development (VGSD) practices we identified a lack of systematic processes/method support and inefficient collaboration between various involved disciplines, i.e. engineers and artists. VGSD includes heterogeneous disciplines, e.g. creative arts, game/content design, and software. Nevertheless, improving team collaboration and process support is an ongoing challenge to enable a comprehensive view on game development projects. Lessons learned from software engineering practices can help game developers to increase game development processes within a heterogeneous environment. Based on a state of the practice survey in the Austrian games industry, this paper presents (a) first results with focus on process/method support and (b) suggests a candidate flexible process approach based on Scrum to improve VGSD and team collaboration. Results showed (a) a trend to highly flexible software processes involving various disciplines and (b) identified the suggested flexible process approach as feasible and useful for project application.

  12. Personality and community prevention teams: Dimensions of team leader and member personality predicting team functioning.

    Science.gov (United States)

    Feinberg, Mark E; Kim, Ji-Yeon; Greenberg, Mark T

    2008-11-01

    The predictors and correlates of positive functioning among community prevention teams have been examined in a number of research studies; however, the role of personality has been neglected. In this study, we examined whether team member and leader personality dimensions assessed at the time of team formation predicted local prevention team functioning 2.5-3.5 years later. Participants were 159 prevention team members in 14 communities participating in the PROSPER study of prevention program dissemination. Three aspects of personality, aggregated at the team level, were examined as predictors: Openness to Experience, Conscientiousness, and Agreeableness. A series of multivariate regression analyses were performed that accounted for the interdependency of five categories of team functioning. Results showed that average team member Openness was negatively, and Conscientiousness was positively linked to team functioning. The findings have implications for decisions about the level and nature of technical assistance support provided to community prevention teams.

  13. Balancing creativity and time efficiency in multi-team R&D projects : the alignment of formal and informal networks

    NARCIS (Netherlands)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    The business world is denoted by an increasing number of multi-team research and development (R&D) projects, however, managerial knowledge about how to run them successfully is scarce. The present study attempts to shed light at this kind of projects by investigating the alignment of formal and

  14. Mid-term evaluation of the Climate Change Action Fund: Technology Early Action Measures (TEAM) block

    International Nuclear Information System (INIS)

    2001-11-01

    To assist Canada in meeting its commitments under the Kyoto Protocol for the reduction of greenhouse gas emissions, the Government of Canada established the Climate Change Action Fund (CCAF) in 1998. Under the CCAF umbrella, the Technology Early Action Measures (TEAM) Block was initially allocated 60 million dollars over a three-year period for the provision of cost-shared support to speed up the development and deployment of cost-effective near market-ready greenhouse gases emission reducing technologies. The main avenues adopted by TEAM in its mandate were: supporting technology development and deployment, overcoming obstacles to technology development and deployment, and piloting technology transfer to developing countries and countries in transition. A mid-term evaluation of its performance to date was conducted. It proved to be too early for an adequate assessment of the extent to which the projects sponsored by TEAM demonstrated technical success in reducing greenhouse gases emissions, considering the time-consuming tasks required for the development and negotiation of technology projects. Most projects to date have not moved beyond the early stages benchmark. It was determined that the expected outcomes will be achieved. The innovative approach selected by TEAM, building on existing programs, appeared to be very effective. Findings and recommendations were discussed in this report

  15. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  16. When Teams Go Crazy

    DEFF Research Database (Denmark)

    Kuhrmann, Marco; Münch, Jürgen

    2016-01-01

    Software development consists to a large extend of human-based processes with continuously increasing demands regarding interdisciplinary team work. Understanding the dynamics of software teams can be seen as highly important to successful project execution. Hence, for future project managers......, knowledge about non-technical processes in teams is significant. In this paper, we present a course unit that provides an environment in which students can learn and experience the impact of group dynamics on project performance and quality. The course unit uses the Tuckman model as theoretical framework......, and borrows from controlled experiments to organize and implement its practical parts in which students then experience the effects of, e.g., time pressure, resource bottlenecks, staff turnover, loss of key personnel, and other stress factors. We provide a detailed design of the course unit to allow...

  17. Performance of Student Software Development Teams: The Influence of Personality and Identifying as Team Members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms…

  18. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    or pre-arranged at random. Therefore we investigate the importance of team formation in the entrepreneurial classroom and ask: (i) What are the underlying factors that influence outcomes of teamwork in student groups? (ii) How does team formation influence student perception of learning?, and (iii) Do...... different team formation strategies produce different teamwork and learning outcomes? Approach: We employed a multiple case study design comprising of 38 student teams to uncover potential links between team formation and student perception of learning. This research draws on data from three different....... A rigorous coding and inductive analysis process was undertaken. Pattern and relationship coding were used to reveal underlying factors, which helped to unveil important similarities and differences between student in different teams’ project progress and perception of learning. Results: When students...

  19. Job satisfaction among mental healthcare professionals: The respective contributions of professional characteristics, team attributes, team processes, and team emergent states

    Science.gov (United States)

    Fleury, Marie-Josée; Grenier, Guy; Bamvita, Jean-Marie

    2017-01-01

    Objectives: The aim of this study was to determine the respective contribution of professional characteristics, team attributes, team processes, and team emergent states on the job satisfaction of 315 mental health professionals from Quebec (Canada). Methods: Job satisfaction was measured with the Job Satisfaction Survey. Independent variables were organized into four categories according to a conceptual framework inspired from the Input-Mediator-Outcomes-Input Model. The contribution of each category of variables was assessed using hierarchical regression analysis. Results: Variations in job satisfaction were mostly explained by team processes, with minimal contribution from the other three categories. Among the six variables significantly associated with job satisfaction in the final model, four were team processes: stronger team support, less team conflict, deeper involvement in the decision-making process, and more team collaboration. Job satisfaction was also associated with nursing and, marginally, male gender (professional characteristics) as well as with a stronger affective commitment toward the team (team emergent states). Discussion and Conclusion: Results confirm the importance for health managers of offering adequate support to mental health professionals, and creating an environment favorable to collaboration and decision-sharing, and likely to reduce conflicts between team members. PMID:29276591

  20. Job satisfaction among mental healthcare professionals: The respective contributions of professional characteristics, team attributes, team processes, and team emergent states.

    Science.gov (United States)

    Fleury, Marie-Josée; Grenier, Guy; Bamvita, Jean-Marie

    2017-01-01

    The aim of this study was to determine the respective contribution of professional characteristics, team attributes, team processes, and team emergent states on the job satisfaction of 315 mental health professionals from Quebec (Canada). Job satisfaction was measured with the Job Satisfaction Survey. Independent variables were organized into four categories according to a conceptual framework inspired from the Input-Mediator-Outcomes-Input Model. The contribution of each category of variables was assessed using hierarchical regression analysis. Variations in job satisfaction were mostly explained by team processes, with minimal contribution from the other three categories. Among the six variables significantly associated with job satisfaction in the final model, four were team processes: stronger team support, less team conflict, deeper involvement in the decision-making process, and more team collaboration. Job satisfaction was also associated with nursing and, marginally, male gender (professional characteristics) as well as with a stronger affective commitment toward the team (team emergent states). Results confirm the importance for health managers of offering adequate support to mental health professionals, and creating an environment favorable to collaboration and decision-sharing, and likely to reduce conflicts between team members.

  1. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  2. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  3. The Sellafield repository project information programme

    Energy Technology Data Exchange (ETDEWEB)

    Curd, P J [United Kingdom Nirex Limited (United Kingdom)

    1993-07-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  4. The Sellafield repository project information programme

    International Nuclear Information System (INIS)

    Curd, P.J.

    1993-01-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  5. Influences of Government Championship on the Technology Innovation Process at the Project-level

    Science.gov (United States)

    Yue, Xin

    Government support is a popular instrument to foster technology innovation. It can take various forms such as financial aid, tax credits, and technological assistance. Along with the firm characteristics, strategic behavior of the project team, characteristics of the technology and the market, and the regulatory environment, government support influences firms' research and development (R&D) motivations, decision making process, and hence technology development performance. How government support influences the performance in different industries is an important policy and research question. There are many studies on the effectiveness and impacts of government support, mostly at program-level or industry-level. Government Championship is a form of government support distinct from direct financial or technological assistance. Championship includes expressing confidence in the innovation, encouraging others to support the innovation, and persisting under adversity. Championship has been studied as a critical inside factor for innovation success, particularly at project-level. Usually a champion emerged within the organization responsible for the innovation project. However, with the intention to encourage technology development, governments can also play a championship role. Government championship, besides government financial and technological assistance (hereafter "government F&T"), could be one major category of government support to facilitate high-technology innovation. However, there are few studies focusing on the effectiveness of government championship, and how it influences the innovation process. This thesis addresses this question through two studies on high-technology development projects. The first study has tested the effectiveness of government championship on the performance of 431 government sponsored technology innovation projects. Government championship and government F&T, as well as project team strategic behavior, are hypothesized to influence

  6. Pioneering the Transdisciplinary Team Science Approach: Lessons Learned from National Cancer Institute Grantees.

    Science.gov (United States)

    Vogel, Amanda L; Stipelman, Brooke A; Hall, Kara L; Nebeling, Linda; Stokols, Daniel; Spruijt-Metz, Donna

    2014-01-01

    The National Cancer Institute has been a leader in supporting transdisciplinary (TD) team science. From 2005-2010, the NCI supported Transdisciplinary Research on Energetic and Cancer I (TREC I), a center initiative fostering the TD integration of social, behavioral, and biological sciences to examine the relationships among obesity, nutrition, physical activity and cancer. In the final year of TREC I, we conducted qualitative in-depth-interviews with 31 participating investigators and trainees to learn more about their experiences with TD team science, including challenges, facilitating factors, strategies for success, and impacts. Five main challenges emerged: (1) limited published guidance for how to engage in TD team science, when TREC I was implemented; (2) conceptual and scientific challenges inherent to efforts to achieve TD integration; (3) discipline-based differences in values, terminology, methods, and work styles; (4) project management challenges involved in TD team science; and (5) traditional incentive and reward systems that do not recognize or reward TD team science. Four main facilitating factors and strategies for success emerged: (1) beneficial attitudes and beliefs about TD research and team science; (2) effective team processes; (3) brokering and bridge-building activities by individuals holding particular roles in a research center; and (4) funding initiative characteristics that support TD team science. Broad impacts of participating in TD team science in the context of TREC I included: (1) new positive attitudes about TD research and team science; (2) new boundary-crossing collaborations; (3) scientific advances related to research approaches, findings, and dissemination; (4) institutional culture change and resource creation in support of TD team science; and (5) career advancement. Funding agencies, academic institutions, and scholarly journals can help to foster TD team science through funding opportunities, institutional policies on

  7. Supporting in grief and burnout of the nursing team from pediatric units in Chilean hospitals.

    Science.gov (United States)

    Vega, Paula Vega; Rodriguez, Rina González; Galdamez, Natalie Santibáñez; Molina, Camila Ferrada; Orellana, Javiera Spicto; Villanueva, Antonia Sateler; Melo, Jose Bustos

    2017-01-01

    Objective To know the levels of Burnout Syndrome and perception of grief support in nursing teams of oncology and pediatric intensive care in public hospitals in Chile. Method A study of descriptive cross-sectional design. The Maslach Burnout Inventory and the Grief Support Health Care Scale were applied to university-level and technical nursing professionals between March and November 2015. An analysis to compare the means was performed with use of the Student's t-test, and the level of significance was set at 5%. Results The study included 153 professionals. Results show 4% of professionals have Burnout Syndrome (BS) and 89% are at risk of having it. Oncology professionals are at higher risk as they present higher levels of emotional exhaustion and lower levels of personal fulfillment. Half of professionals have a high level of perception of grief support, which is greater in the oncology team. Conclusion Professionals working in pediatric oncology units are at increased risk of Burnout Syndrome and grief support may be a mediating factor in this process.

  8. Extra-team connections for knowledge transfer between staff teams

    Science.gov (United States)

    Ramanadhan, Shoba; Wiecha, Jean L.; Emmons, Karen M.; Gortmaker, Steven L.; Viswanath, Kasisomayajula

    2009-01-01

    As organizations implement novel health promotion programs across multiple sites, they face great challenges related to knowledge management. Staff social networks may be a useful medium for transferring program-related knowledge in multi-site implementation efforts. To study this potential, we focused on the role of extra-team connections (ties between staff members based in different site teams) as potential channels for knowledge sharing. Data come from a cross-sectional study of afterschool childcare staff implementing a health promotion program at 20 urban sites of the Young Men's Christian Association of Greater Boston. We conducted a sociometric social network analysis and attempted a census of 91 program staff members. We surveyed 80 individuals, and included 73 coordinators and general staff, who lead and support implementation, respectively, in this study. A multiple linear regression model demonstrated a positive relationship between extra-team connections (β = 3.41, P knowledge transfer. We also found that intra-team connections (within-team ties between staff members) were also positively related to skill receipt. Connections between teams appear to support knowledge transfer in this network, but likely require greater active facilitation, perhaps via organizational changes. Further research on extra-team connections and knowledge transfer in low-resource, high turnover environments is needed. PMID:19528313

  9. Technical support for universal health coverage pilots in Karnataka ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Technical support for universal health coverage pilots in Karnataka and Kerala. This project will provide evidence-based support to implement universal health coverage (UHC) pilot activities in two Indian states: Kerala and Karnataka. The project team will provide technical assistance to these early adopter states to assist ...

  10. Team Scaffolds: How Minimal Team Structures Enable Role-based Coordination

    OpenAIRE

    Valentine, Melissa A

    2013-01-01

    In this dissertation, I integrate research on role-based coordination with concepts adapted from the team effectiveness literature to theorize how minimal team structures support effective coordination when people do not work together regularly. I argue that role-based coordination among relative strangers can be interpersonally challenging and propose that team scaffolds (minimal team structures that bound groups of roles rather than groups of individuals) may provide occupants with a tempor...

  11. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Pickering, Karen D.; Cox, Marlon; Towsend, Neil; Campbell, Colin; Flynn, Michael; Wheeler, Raymond

    2012-01-01

    Next Generation Life Support (NGLS) is one of several technology development projects sponsored by NASA s Game Changing Development Program. The NGLS Project is developing life support technologies (including water recovery and space suit life support technologies) needed for humans to live and work productively in space. NGLS has three project tasks: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, and Alternative Water Processor (AWP). The RCA swing bed and VOR tasks are directed at key technology needs for the Portable Life Support System (PLSS) for an Advanced Extravehicular Mobility Unit, with focus on test article development and integrated testing in an Advanced PLSS in cooperation with the Advanced Extra Vehicular Activity (EVA) Project. An RCA swing-bed provides integrated carbon dioxide removal and humidity control that can be regenerated in real time during an EVA. The VOR technology will significantly increase the number of pressure settings available to the space suit. Current space suit pressure regulators are limited to only two settings whereas the adjustability of the advanced regulator will be nearly continuous. The AWP effort, based on natural biological processes and membrane-based secondary treatment, will result in the development of a system capable of recycling wastewater from sources expected in future exploration missions, including hygiene and laundry water. This paper will provide a status of technology development activities and future plans.

  12. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  13. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  14. Autonomy support and motivational responses across training and competition in individual and team sports

    NARCIS (Netherlands)

    Pol, P.K.C. van de; Kavussanu, M.; Kompier, M.A.J.

    2015-01-01

    This study examined: (a) whether athletes’ (N = 348) perceived autonomy support (i.e., showing interest in athletes’ input and praising autonomous behavior) differs across contexts (training vs. competition) and sport types (individual vs. team sports), and (b) whether the relationships between

  15. UAVs Use for the Support of Emergency Response Teams Specific Missions

    Directory of Open Access Journals (Sweden)

    Sorin-Gabriel CONSTANTINESCU

    2013-03-01

    Full Text Available This article presents various methods of implementation for a new technology concerning the assessment and coordination of emergency situations, which is based upon the usage of Unmanned Aerial Vehicles (UAVs. The UAV platform is equipped with optical electronic sensors and other types of sensors, being an aerial surveillance device as efficient as any other classically piloted platform. While currently being in service as military operations support for various operation theaters, they can also be used for assisting emergency response teams, providing full national coverage. For these special response teams, the ability to carry out overview, surveillance or information gathering activities and locating fixed or mobile targets are key components for the successful accomplishment of their missions, which have the purpose of saving lives and properties and of limiting the damage done to the surrounding environment. More concretely, the presented scenarios are: response in emergency situations, extinguishing of large-scale fires, testing of chemically, biologically or radioactively polluted areas and assessment of natural disasters.

  16. Factors Contributing to Research Team Effectiveness: Testing a Model of Team Effectiveness in an Academic Setting

    Science.gov (United States)

    Omar, Zoharah; Ahmad, Aminah

    2014-01-01

    Following the classic systems model of inputs, processes, and outputs, this study examined the influence of three input factors, team climate, work overload, and team leadership, on research project team effectiveness as measured by publication productivity, team member satisfaction, and job frustration. This study also examined the mediating…

  17. Are they ready? Organizational readiness for change among clinical teaching teams.

    Science.gov (United States)

    Bank, Lindsay; Jippes, Mariëlle; Leppink, Jimmie; Scherpbier, Albert Jja; den Rooyen, Corry; van Luijk, Scheltus J; Scheele, Fedde

    2017-01-01

    Curriculum change and innovation are inevitable parts of progress in postgraduate medical education (PGME). Although implementing change is known to be challenging, change management principles are rarely looked at for support. Change experts contend that organizational readiness for change (ORC) is a critical precursor for the successful implementation of change initiatives. Therefore, this study explores whether assessing ORC in clinical teaching teams could help to understand how curriculum change takes place in PGME. Clinical teaching teams in hospitals in the Netherlands were requested to complete the Specialty Training's Organizational Readiness for curriculum Change, a questionnaire to measure ORC in clinical teaching teams. In addition, change-related behavior was measured by using the "behavioral support-for-change" measure. A two-way analysis of variance was performed for all response variables of interest. In total, 836 clinical teaching team members were included in this study: 288 (34.4%) trainees, 307 (36.7%) clinical staff members, and 241 (28.8%) program directors. Overall, items regarding whether the program director has the authority to lead scored higher compared with the other items. At the other end, the subscales "management support and leadership," "project resources," and "implementation plan" had the lowest scores in all groups. The study brought to light that program directors are clearly in the lead when it comes to the implementation of educational innovation. Clinical teaching teams tend to work together as a team, sharing responsibilities in the implementation process. However, the results also reinforce the need for change management support in change processes in PGME.

  18. A conceptual model to improve performance in virtual teams

    Directory of Open Access Journals (Sweden)

    Shopee Dube

    2016-09-01

    Full Text Available Background: The vast improvement in communication technologies and sophisticated project management tools, methods and techniques has allowed geographically and culturally diverse groups to operate and function in a virtual environment. To succeed in this virtual environment where time and space are becoming increasingly irrelevant, organisations must define new ways of implementing initiatives. This virtual environment phenomenon has brought about the formation of virtual project teams that allow organisations to harness the skills and knowhow of the best resources, irrespective of their location. Objectives: The aim of this article was to investigate performance criteria and develop a conceptual model which can be applied to enhance the success of virtual project teams. There are no clear guidelines of the performance criteria in managing virtual project teams. Method: A qualitative research methodology was used in this article. The purpose of content analysis was to explore the literature to understand the concept of performance in virtual project teams and to summarise the findings of the literature reviewed. Results: The research identified a set of performance criteria for the virtual project teams as follows: leadership, trust, communication, team cooperation, reliability, motivation, comfort and social interaction. These were used to conceptualise the model. Conclusion: The conceptual model can be used in a holistic way to determine the overall performance of the virtual project team, but each factor can be analysed individually to determine the impact on the overall performance. The knowledge of performance criteria for virtual project teams could aid project managers in enhancing the success of these teams and taking a different approach to better manage and coordinate them.

  19. Task team approach to safeguards and security designs

    International Nuclear Information System (INIS)

    Zack, N.R.; Wilkey, D.D.

    1991-01-01

    In 1987, a U.S. department of Energy (DOE) supported task team was organized at the request of the DOE Idaho Field Office (DOE-ID) to provide support for safeguards and security (S and S) designs of the Special Isotope Separation (SIS) facility. Prior to deferral of the project, the SIS facility was to be constructed at the Idaho National Engineering Laboratory (INEL) to produce weapons grade plutonium from DOE owned fuel grade plutonium. The task team was assembled to provide the resources necessary to assure that S and S considerations were included as an integral part of the design of the facility, and that SIS designs would take advantage of available technology in the areas of physical security, measurements, accountability, and material and personnel tracking. The task team included personnel from DOE/Office of Safeguards and Security (DOE-OSS), DOE-ID, DOE contractors, and the national laboratories providing a wide range of expertise and experience. This paper reports that the team reviewed proposed designs and provided recommendations for safeguards and security features in each stage of the design process. The value of this approach to safeguards and security designs will be discussed with respect to benefits, lessons learned, and recommendations for future applications

  20. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  1. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Science.gov (United States)

    Van Hooft, Edwin A. J.; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination. PMID:29674991

  2. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Directory of Open Access Journals (Sweden)

    Edwin A. J. Van Hooft

    2018-04-01

    Full Text Available Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  3. Uncovering Transdisciplinary Team Project Outcomes through Ripple Effect Mapping

    Science.gov (United States)

    Daniels, Catherine H.; Chalker-Scott, Linda; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary, geographically dispersed group of faculty and staff. As with many such teams, member retention requires effort, as busy individuals may not see the overall benefits of active team membership. Ripple effect mapping is a strategy that can illustrate the tangible and often…

  4. How Do Staff Perceive Schoolwide Positive Behavior Supports? Implications for Teams in Planning and Implementing Schools

    Science.gov (United States)

    Feuerborn, Laura L.; Tyre, Ashli D.

    2016-01-01

    Schoolwide Positive Behavior Support (SWPBS) offers an alternative to reactive and exclusionary school discipline practices. However, the shift to SWPBS requires substantial change in the practices of staff, and many leadership teams struggle to rally staff support for implementation. With a more thorough understanding of staff perceptions, level…

  5. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  6. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  7. CROSS: A GDSS for the Evaluation and Prioritization of Engineering Support Requests and Advanced Technology Projects at NASA

    Science.gov (United States)

    Tavana, Madjid; Lee, Seunghee

    1996-01-01

    Objective evaluation and prioritization of engineering support requests (ESRs) is a difficult task at the Kennedy Space Center (KSC) Shuttle Project Engineering Office. The difficulty arises from the complexities inherent in the evaluation process and the lack of structured information. The purpose of this project is to implement the consensus ranking organizational support system (CROSS), a multiple criteria decision support system (DSS) developed at KSC that captures the decision maker's beliefs through a series of sequential, rational, and analytical processes. CROSS utilizes the analytic hierarchy process (AHP), subjective probabilities, entropy concept, and maximize agreement heuristic (MAH) to enhance the decision maker's intuition in evaluation ESRs. Some of the preliminary goals of the project are to: (1) revisit the structure of the ground systems working team (GWST) steering committee, (2) develop a template for ESR originators to provide more comple and consistent information to the GSWT steering committee members to eliminate the need for a facilitator, (3) develop an objective and structured process for the initial screening of ESRs, (4) extensive training of the stakeholders and the GWST steering committee to eliminate the need for a facilitator, (5) automate the process as much as possible, (6) create an environment to compile project success factor data on ESRs and move towards a disciplined system that could be used to address supportability threshold issues at the KSC, and (7) investigate the possibility of an organization-wide implementation of CROSS.

  8. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  9. Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Group).

    Science.gov (United States)

    Kim, Jae Kyoung; Jeong, Ina; Lee, Ji Yeon; Kim, Jung Hyun; Han, Ah Yeon; Kim, So Yeon; Joh, Joon Sung

    2018-03-07

    The "Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Groups)" is a national program for socioeconomically vulnerable tuberculosis (TB) patients. We sought to evaluate the clinical and socioeconomic characteristics of poverty-stricken TB patients, and determined the need for relief. We examined in-patients with TB, who were supported by this project at the National Medical Center from 2014 to 2015. We retrospectively investigated the patients' socioeconomic status, clinical characteristics, and project expenditures. Fifty-eight patients were enrolled. Among 55 patients with known income status, 24 (43.6%) had no income. Most patients (80%) lived alone. A total of 48 patients (82.8%) had more than one underlying disease. More than half of the enrolled patients (30 patients, 51.7%) had smear-positive TB. Cavitary disease was found in 38 patients (65.5%). Among the 38 patients with known resistance status, 19 (50%) had drug-resistant TB. In terms of disease severity, 96.6% of the cases had moderate-to-severe disease. A total of 14 patients (26.4%) died during treatment. Nursing expenses were supported for 12 patients (20.7%), with patient transportation costs reimbursed for 35 patients (60%). In terms of treatment expenses for 31 people (53.4%), 93.5% of them were supported by uninsured benefits. Underlying disease, infectivity, drug resistance, severity, and death occurred frequently in socioeconomically vulnerable patients with TB. Many uninsured treatment costs were not supported by the current government TB programs, and the "Tuberculosis Relief Belt Supporting Project" compensated for these limitations. Copyright©2018. The Korean Academy of Tuberculosis and Respiratory Diseases.

  10. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    Science.gov (United States)

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  11. Sharing information in teams : Giving up privacy or compromising on team performance?

    NARCIS (Netherlands)

    Harbers, M.; Aydogan, R.; Jonker, C.M.; Neerincx, M.A.

    2014-01-01

    Human teamwork can be supported by agent technology by providing each human team member with an agent that monitors, supports and advices the human. The agent can, for example, monitor the human's workload, and share that information with (agents of) other team members so that work can be

  12. Real-Time Support of Pediatric Diabetes Self-Care by a Transport Team

    OpenAIRE

    Franklin, Brandi E.; Crisler, S. Crile; Shappley, Rebekah; Armour, Meri M.; McCommon, Dana T.; Ferry, Robert J.

    2013-01-01

    OBJECTIVE The study seeks to improve access for underserved patients via novel integration of Pedi-Flite (a critical care transport team) and to validate whether this safely enhances diabetes care and effectively expands the endocrine workforce. RESEARCH DESIGN AND METHODS The study retrospectively analyzed pager service use in a cohort of established diabetic patients (n = 979) after inception of Pedi-Flite support. Outcomes included incidence and severity of recurrent diabetic ketoacidosis ...

  13. Ontario pharmacists practicing in family health teams and the patient-centered medical home.

    Science.gov (United States)

    Dolovich, Lisa

    2012-04-01

    The patient-centered medical home (PCMH) approach continues to gather momentum in the United States and Canada as a broad approach to reform the delivery of the complete primary care system. The family health team (FHT) model implemented in Ontario, Canada, best mirrors the PCMH approach of the United States. The integration of pharmacists as key members of the health care team providing on-site, in-office coordinated care to FHT patients was included from the start of planning the FHT model and represents a substantial opportunity for pharmacists to realize their professional vision. Several research projects in Canada and elsewhere have contributed to providing evidence to support the integration of pharmacists into primary care practice sites. Two major research programs, the Seniors Medication Assessment Research Trial (SMART) cluster randomized controlled trial and the Integrating Family Medicine and Pharmacy to Advance Primary Care Therapeutics (IMPACT) multipronged demonstration project made substantial contributions to evidence-informed policy decisions supporting the integration of pharmacists into FHTs. These projects can provide useful information to support the integration of pharmacists into the PCMH and to encourage further research to better measure the effect of the pharmacist from the holistic patient-centered perspective.

  14. Task versus relationship conflict, team performance, and team member satisfaction: a meta-analysis.

    Science.gov (United States)

    De Dreu, Carsten K W; Weingart, Laurie R

    2003-08-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, results revealed strong and negative correlations between relationship conflict, team performance, and team member satisfaction. In contrast to what has been suggested in both academic research and introductory textbooks, however, results also revealed strong and negative (instead of the predicted positive) correlations between task conflict team performance, and team member satisfaction. As predicted, conflict had stronger negative relations with team performance in highly complex (decision making, project, mixed) than in less complex (production) tasks. Finally, task conflict was less negatively related to team performance when task conflict and relationship conflict were weakly, rather than strongly, correlated.

  15. Sounds like Team Spirit

    Science.gov (United States)

    Hoffman, Edward

    2002-01-01

    trying to improve on what they've done before. Second, success in any endeavor stems from people who know how to interpret a composition to sound beautiful when played in a different style. For Knowledge Sharing to work, it must be adapted, reinterpreted, shaped and played with at the centers. In this regard, we've been blessed with another crazy, passionate, inspired artist named Claire Smith. Claire has turned Ames Research Center in California into APPL-west. She is so good and committed to what she does that I just refer people to her whenever they have questions about implementing project management development at the field level. Finally, any great effort requires talented people working behind the scenes, the people who formulate a business approach and know how to manage the money so that the music gets heard. I have known many brilliant and creative people with a ton of ideas that never take off due to an inability to work the business. Again, the Knowledge Sharing team has been fortunate to have competent and passionate people, specifically Tony Maturo and his procurement team at Goddard Space Flight Center, to make sure the process is in place to support the effort. This kind of support is every bit as crucial as the activity itself, and the efforts and creativity that go into successful procurement and contracting is a vital ingredient of this successful team.

  16. Action-Centered Team Leadership Influences More than Performance

    DEFF Research Database (Denmark)

    Braun, Frank C.; Avital, Michel; Martz, Ben

    2012-01-01

    Purpose – Building on a social-technical approach to project management, the authors aim to examine the effect of action-centered leadership attributes on team member's learning, knowledge collaboration and job satisfaction during IT-related projects. Design/methodology/approach – Structural...... collaboration along with individual performance and job satisfaction, and ultimately project success. Research limitations/implications – The action-centered leadership practices construct, developed in this study, can be a good surrogate measure of what is required to be an effective leader in an IT project...... equation modeling was utilized to assess the work environment of team members as well as the leadership practices of their respective project team leaders. Data were collected with a survey questionnaire from 327 team members in a variety of organizations in 15 industry sectors including financial services...

  17. Improving Scientific Research Methodology in Undergraduate Medical Students: a case of team based training blended in a research project

    Institute of Scientific and Technical Information of China (English)

    W.Zhang; C.Cambier; Y.Zhang; J.M.Vandeweerd; P.Gustin

    2014-01-01

    An educational intervention targeting medical students and aiming to develop skills useful to the writing of a health science research protocol over a short period of time has been developed in the Shanghai Jiao Tong University School of Medicine. The methodology blending the principles of PBL and TBL is detailed and key issues of this implementation are discussed. Twenty-one students were enrolled in a research master degree and participated to three mandatory 180-minutes sessions. Beyond classical skills useful to solve a problem, this new intervention focused on the transformation of knowledge to create an authentic content, which is a feature of the project-based learning(PBL). The training process was designed according to team-based learning(TBL) procedure except that work sharing between groups and pooling resources and outcomes of each group allowed the construction of one final class original research project in the field of respiratory pharmacology. The combination of both learning methods allowed promoting individual and group accountability necessary to improve self-learning and the quality of the final joint project. The peer reviewing was an essential factor in creating the students’ motivation and improving of team discussion. The grades individually assigned for skills and quality of the project by an external teacher suggested that key objectives of the intervention were reached. In conclusion, the educational intervention described in this paper appears as an appropriate method to develop specific skills necessary to write and discuss a research project within a research team.Further works are necessary to measure the degree of satisfaction of students and improvement of performance.

  18. The codesign of an interdisciplinary team-based intervention regarding initiating palliative care in pediatric oncology.

    Science.gov (United States)

    Hill, Douglas L; Walter, Jennifer K; Casas, Jessica A; DiDomenico, Concetta; Szymczak, Julia E; Feudtner, Chris

    2018-04-07

    Children with advanced cancer are often not referred to palliative or hospice care before they die or are only referred close to the child's death. The goals of the current project were to learn about pediatric oncology team members' perspectives on palliative care, to collaborate with team members to modify and tailor three separate interdisciplinary team-based interventions regarding initiating palliative care, and to assess the feasibility of this collaborative approach. We used a modified version of experience-based codesign (EBCD) involving members of the pediatric palliative care team and three interdisciplinary pediatric oncology teams (Bone Marrow Transplant, Neuro-Oncology, and Solid Tumor) to review and tailor materials for three team-based interventions. Eleven pediatric oncology team members participated in four codesign sessions to discuss their experiences with initiating palliative care and to review the proposed intervention including patient case studies, techniques for managing uncertainty and negative emotions, role ambiguity, system-level barriers, and team communication and collaboration. The codesign process showed that the participants were strong supporters of palliative care, members of different teams had preferences for different materials that would be appropriate for their teams, and that while participants reported frustration with timing of palliative care, they had difficulty suggesting how to change current practices. The current project demonstrated the feasibility of collaborating with pediatric oncology clinicians to develop interventions about introducing palliative care. The procedures and results of this project will be posted online so that other institutions can use them as a model for developing similar interventions appropriate for their needs.

  19. MicroBooNE project team recognized by Department of Energy | News

    Science.gov (United States)

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  20. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  1. Change champions at the grassroots level: practice innovation using team process.

    Science.gov (United States)

    Scott, J; Rantz, M

    1994-01-01

    A nursing administrative group recognized the critical value of staff participation in the formulation of a restructuring project and guidance throughout the project. Using a team approach, a task force of three staff nurses, two assistant nurse managers, a nurse clinician, a nursing practice specialist, and a representative from nursing administration came together. They were given responsibility for researching and setting the course for restructuring change. A unit-based team including a unit secretary, a nursing attendant, licensed practical nurse (LPN), and six staff nurses was formed from volunteers from the 40-bed medicine unit to develop that unit's plan for restructuring. The unit-based team analyzed patient care needs and staff member roles. They created a new patient care technician role as well as a nurse care coordinator role. The role of the LPN was envisioned as providing technical support. Staffing mix was also determined by the unit-based team. Both the task force and the unit-based team continue to evaluate, troubleshoot, and take every opportunity to sell their vision to solidify it further as the foundation for the future of patient care services at the hospital. The process will soon move forward to a large surgical unit.

  2. Database Support for Workflow Management: The WIDE Project

    NARCIS (Netherlands)

    Grefen, P.W.P.J.; Pernici, B; Sánchez, G.; Unknown, [Unknown

    1999-01-01

    Database Support for Workflow Management: The WIDE Project presents the results of the ESPRIT WIDE project on advanced database support for workflow management. The book discusses the state of the art in combining database management and workflow management technology, especially in the areas of

  3. Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

    Science.gov (United States)

    Barta, Daniel J.; Edeen, Marybeth A.; Henninger, Donald L.

    2006-01-01

    The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30, 60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized

  4. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Vega, Leticia; Cox, Marlon R.; Aitchison, Lindsay T.; Lange, Kevin E.; Pensinger, Stuart J.; Meyer, Caitlin E.; Flynn, Michael; Jackson, W. Andrew; hide

    2014-01-01

    Next Generation Life Support (NGLS) is one of over twenty technology development projects sponsored by NASA's Game Changing Development Program. The NGLS Project develops selected life support technologies needed for humans to live and work productively in space, with focus on technologies for future use in spacecraft cabin and space suit applications. Over the last three years, NGLS had five main project elements: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, High Performance (HP) Extravehicular Activity (EVA) Glove, Alternative Water Processor (AWP) and Series-Bosch Carbon Dioxide Reduction. The RCA swing bed, VOR and HP EVA Glove tasks are directed at key technology needs for the Portable Life Support System (PLSS) and pressure garment for an Advanced Extravehicular Mobility Unit (EMU). Focus is on prototyping and integrated testing in cooperation with the Advanced Exploration Systems (AES) Advanced EVA Project. The HP EVA Glove Element, new this fiscal year, includes the generation of requirements and standards to guide development and evaluation of new glove designs. The AWP and Bosch efforts focus on regenerative technologies to further close spacecraft cabin atmosphere revitalization and water recovery loops and to meet technology maturation milestones defined in NASA's Space Technology Roadmaps. These activities are aimed at increasing affordability, reliability, and vehicle self-sufficiency while decreasing mass and mission cost, supporting a capability-driven architecture for extending human presence beyond low-Earth orbit, along a human path toward Mars. This paper provides a status of current technology development activities with a brief overview of future plans.

  5. Virtual Team Governance: Addressing the Governance Mechanisms and Virtual Team Performance

    Science.gov (United States)

    Zhan, Yihong; Bai, Yu; Liu, Ziheng

    As technology has improved and collaborative software has been developed, virtual teams with geographically dispersed members spread across diverse physical locations have become increasingly prominent. Virtual team is supported by advancing communication technologies, which makes virtual teams able to largely transcend time and space. Virtual teams have changed the corporate landscape, which are more complex and dynamic than traditional teams since the members of virtual teams are spread on diverse geographical locations and their roles in the virtual team are different. Therefore, how to realize good governance of virtual team and arrive at good virtual team performance is becoming critical and challenging. Good virtual team governance is essential for a high-performance virtual team. This paper explores the performance and the governance mechanism of virtual team. It establishes a model to explain the relationship between the performance and the governance mechanisms in virtual teams. This paper is focusing on managing virtual teams. It aims to find the strategies to help business organizations to improve the performance of their virtual teams and arrive at the objectives of good virtual team management.

  6. Supporting rural remote physicians to conduct a study and write a paper: experience of Clinical Research Support Team (CRST)-Jichi.

    Science.gov (United States)

    Matsubara, S; Ohkuchi, A; Kamesaki, T; Ishikawa, S; Nakamura, Y; Matsumoto, M

    2014-01-01

    Jichi Medical University (JMU) is the only medical school in Japan that is devoted solely to producing rural and remote doctors. To support research activities of its graduates, mainly young graduates under obligatory rural service, JMU established a voluntary team, Clinical Research Support Team (CRST)-Jichi. CRST-Jichi consists of current and past JMU faculty members; all of them are specialists of certain medical fields and many are also graduates of JMU who have completed rural service. A client who asks the CRST for advice on study design or editing a paper emails the CRST to ask for support in conducting a study. Then, core members of the CRST assign the job to a registered specialist of the corresponding topic, who becomes a 'responsible supporter' and continues to support the client until a paper has been published. During the 3 years from July 2010, 12 English papers have been published in international peer-review journals, two Japanese papers in domestic journals, and 13 studies are in progress. Ninety-one percent of clients were satisfied with the service, and eighty-two percent considered their papers would not have been published if they had not used the service. Sense of commitment, existence of JMU-graduated specialists, and quick response were reported by clients as major strengths of CRST-Jichi. The experience of CRST-Jichi can potentially be transferred to not only other Japanese medical schools with rural doctor production programs, which are now rapidly increasing as part of a national policy, but also rural medical education systems in other countries.

  7. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    Science.gov (United States)

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  8. Changes in information behavior in clinical teams after introduction of a clinical librarian service

    Science.gov (United States)

    Urquhart, Christine; Turner, Janet; Durbin, Jane; Ryan, Jean

    2007-01-01

    Objectives: The eighteen-month evaluation of a clinical librarian project (October 2003–March 2005) conducted in North Wales, United Kingdom (UK) assessed the benefits of clinical librarian support to clinical teams, the impact of mediated searching services, and the effectiveness of information skills training, including journal club support. Methods: The evaluation assessed changes in teams' information-seeking behavior and their willingness to delegate searching to a clinical librarian. Baseline (n = 69 responses, 73% response rate) and final questionnaire (n = 57, 77% response rate) surveys were complemented by telephone and face-to-face interviews (n = 33) among 3 sites served. Those attending information skills training sessions (n = 130) completed evaluations at the session and were surveyed 1 month after training (n = 24 questionnaire responses, n = 12 interviews). Results: Health professionals in clinical teams reported that they were more willing to undertake their own searching, but also more willing to delegate some literature searching, than at the start of the project. The extent of change depended on the team and the type of information required. Information skills training was particularly effective when organized around journal clubs. Conclusions: Collaboration with a clinical librarian increased clinician willingness to seek information. Clinical librarian services should leverage structured training opportunities such as journal clubs. PMID:17252062

  9. Safety Training and Awareness: a team at your service

    CERN Multimedia

    HSE Unit

    2014-01-01

    Ever wondered who is on the other end of the safety-training@cern.ch e-mail address? If so, you might like to know that all the activities relating to safety training and awareness (“Safety Training" for short) are managed by a team dedicated to ensuring the smooth running of CERN’s safety training courses.    Photo: Christoph Balle. This team currently consists of five people: the manager in charge of coordinating all the projects, two administrative assistants who provide logistical support and two technicians who manage the training centre. This team, which has seen its workload and the number of challenges it faces increase considerably with LS1, is responsible for organising classroom training sessions (in partnership with some 15 training bodies) and for the management of online e-learning courses in partnership with the GS-AIS Group. The members of the team don't just deal with enrolment on the courses: they also help with the development...

  10. Exploring dialectical behaviour therapy clinicians' experiences of team consultation meetings.

    Science.gov (United States)

    Walsh, Cian; Ryan, Patrick; Flynn, Daniel

    2018-01-01

    This article presents a detailed idiographic analysis of Dialectical Behaviour Therapy (DBT) clinicians' experiences of team consultation meetings. DBT is an evidence-based psychological intervention with a demonstrated efficacy in the treatment of borderline personality disorder (BPD). Team consultation meetings encompass one of the primary components involved in this treatment model; where DBT clinicians regularly meet to discuss client work and enhance further learning. The present study's aim was to assess what are DBT clinicians' experiences of the consultation meeting component and whether it is useful or not. Semi-structured interviews were completed with 11 DBT clinicians (nine females, two males) from three different consultation teams. The research project utilised an interpretative phenomenological analysis (IPA) framework. Audio-recorded interview data was analysed using this framework. Four superordinate themes emerged from the interview data, which included ten subordinate themes. The superordinate themes focused on: (1) the acquisition of DBT technical knowledge and other MDT related expertise (2) participants' emotional experiences of DBT and consultation meetings, and how this can evolve over time (3) the underlying processes that occur in the consultation team including the development of a team bond and the impact of membership changes and (4) the largely consistent and reliable nature of consultation meetings and how they help maintain clinician motivation. Team consultation meetings were found to be supportive; playing an important role in maintaining clinician motivation through the availability of team support, opportunities to reflect and learn, and assistance in regulating emotions. Challenges arose in relation to team membership changes and acclimatisation to the type of feedback utilised in team consultation. The study's implications for practise are considered.

  11. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    Directory of Open Access Journals (Sweden)

    Jiaojie Han

    Full Text Available The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  12. Understanding the Effects of Team Cognition Associated with Complex Engineering Tasks: Dynamics of Shared Mental Models, Task-SMM, and Team-SMM

    Science.gov (United States)

    Lee, Miyoung; Johnson, Tristan E.

    2008-01-01

    This study investigates how shared mental models (SMMs) change over time in teams of students in a manufacturing engineering course. A complex ill-structured project was given to each team. The objective of the team project was to analyze, test, and propose ways to improve their given manufactured product. Shared mental models were measured in…

  13. The Creation and Operation of Internal High Performance Modern Enterprises Team

    Institute of Scientific and Technical Information of China (English)

    Shengyu WANG

    2015-01-01

    The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.

  14. Transforming Virtual Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    2005-01-01

    Investigating virtual team collaboration in industry using grounded theory this paper presents the in-dept analysis of empirical work conducted in a global organization of 100.000 employees where a global virtual team with participants from Sweden, United Kingdom, Canada, and North America were...... studied. The research question investigated is how collaboration is negotiated within virtual teams? This paper presents findings concerning how collaboration is negotiated within a virtual team and elaborate the difficulties due to invisible articulation work and managing multiple communities...... in transforming the virtual team into a community. It is argued that translucence in communication structures within the virtual team and between team and management is essential for engaging in a positive transformation process of trustworthiness supporting the team becoming a community, managing the immanent...

  15. Supporting the development of shared understanding in distributed design teams

    DEFF Research Database (Denmark)

    Cash, Philip; Dekoninck, Elies A; Ahmed-Kristensen, Saeema

    2017-01-01

    Distributed teams are an increasingly common feature of engineeringdesign work. One key factor in the success of these teams isthe development of short- and longer-term shared understanding.A lack of shared understanding has been recognized as a significantchallenge, particularly in the context o...... directly comparing homogeneous and heterogeneousteams in the engineering design context. This has implicationsfor how distributed teams can be more effectively supportedin practice, as well as how shared understanding can be facilitated inengineering design.......Distributed teams are an increasingly common feature of engineeringdesign work. One key factor in the success of these teams isthe development of short- and longer-term shared understanding.A lack of shared understanding has been recognized as a significantchallenge, particularly in the context...... of globally distributed engineeringactivities. A major antecedent for shared understanding isquestion asking and feedback. Building on question-asking theorythis work uses a quasi-experimental study to test the impact of questioningsupport on homogeneous and heterogeneous teams. Theresults show significant...

  16. Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant's QA programs that are necessary for this project

  17. Ten principles of good interdisciplinary team work.

    Science.gov (United States)

    Nancarrow, Susan A; Booth, Andrew; Ariss, Steven; Smith, Tony; Enderby, Pam; Roots, Alison

    2013-05-10

    Interdisciplinary team work is increasingly prevalent, supported by policies and practices that bring care closer to the patient and challenge traditional professional boundaries. To date, there has been a great deal of emphasis on the processes of team work, and in some cases, outcomes. This study draws on two sources of knowledge to identify the attributes of a good interdisciplinary team; a published systematic review of the literature on interdisciplinary team work, and the perceptions of over 253 staff from 11 community rehabilitation and intermediate care teams in the UK. These data sources were merged using qualitative content analysis to arrive at a framework that identifies characteristics and proposes ten competencies that support effective interdisciplinary team work. Ten characteristics underpinning effective interdisciplinary team work were identified: positive leadership and management attributes; communication strategies and structures; personal rewards, training and development; appropriate resources and procedures; appropriate skill mix; supportive team climate; individual characteristics that support interdisciplinary team work; clarity of vision; quality and outcomes of care; and respecting and understanding roles. We propose competency statements that an effective interdisciplinary team functioning at a high level should demonstrate.

  18. Explaining variation in perceived team effectiveness: results from eleven quality improvement collaboratives.

    Science.gov (United States)

    Strating, Mathilde M H; Nieboer, Anna P

    2013-06-01

    Explore effectiveness of 11 collaboratives focusing on 11 different topics, as perceived by local improvement teams and to explore associations with collaborative-, organisational- and team-level factors. Evidence underlying the effectiveness of quality improvement collaboratives is inconclusive and few studies investigated determinants of implementation success. Moreover, most evaluation studies on quality improvement collaboratives are based on one specific topic or quality problem, making it hard to compare across collaboratives addressing different topics. A multiple-case cross-sectional study. Quality improvement teams in 11 quality improvement collaboratives focusing on 11 different topics. Team members received a postal questionnaire at the end of each collaborative. Of the 283 improvement teams, 151 project leaders and 362 team members returned the questionnaire. Analysis of variance revealed that teams varied widely on perceived effectiveness. Especially, members in the Prevention of Malnutrition and Prevention of Medication Errors collaboratives perceived a higher effectiveness than other groups. Multilevel regression analyses showed that educational level of professionals, innovation attributes, organisational support, innovative culture and commitment to change were all significant predictors of perceived effectiveness. In total, 27·9% of the individual-level variance, 57·6% of the team-level variance and 80% of the collaborative-level variance could be explained. The innovation's attributes, organisational support, an innovative team culture and professionals' commitment to change are instrumental to perceived effectiveness. The results support the notion that a layered approach is necessary to achieve improvements in quality of care and provides further insight in the determinants of success of quality improvement collaboratives. Understanding which factors enhance the impact of quality improvement initiatives can help professionals to achieve

  19. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    International Nuclear Information System (INIS)

    Adams, N

    2007-01-01

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  20. The Use of ICT Platforms to Promote Knowledge Exchange in Project-Based Organisations

    Directory of Open Access Journals (Sweden)

    Priyono Anjar

    2016-12-01

    Full Text Available This study aims to investigate the use of information and communication technology (ICT to support knowledge exchange in project-based organisations. The primary ICT tool investigated in this research is WhatsApp, a messaging application that has been widely used since its introduction. An ethnographic case study method was utilised to analyse qualitative data collected from interviews and focus group discussions. Three projects in an Indonesian university with a duration ranging from 8 months to 2 years were examined as object of investigations. Broadly, the findings show that ICT tools are generally useful in supporting knowledge exchange, which ultimately positively affects project performance. The project teams relied on WhatsApp for the success of the projects. Although face-to-face meetings were rare, team communication was highly intensive, supported by WhatsApp. In addition, managers are encouraged to promote knowledge exchange between team members. Through knowledge exchange, there will be knowledge development, which facilitates the invention of new techniques and methods for promoting project success. The most prominent findings are presented using direct quotations to provide first hand insight from the field. At the end of the paper, recommendations regarding what project managers should do during and after the project has been completed are presented. The recommendations are classified based on the knowledge management life cycle, representing a structured method to manage knowledge in project-based organisations.

  1. Evaluation of an Initiative for Fostering Provider-Pharmacist Team Management of Hypertension in Communities

    Directory of Open Access Journals (Sweden)

    William R. Doucette

    2014-01-01

    Full Text Available Objectives: 1 Conduct team building activities for provider-community pharmacist teams in small communities and 2 Determine the impact of the team approach on practitioner-reported consequences and 3 Identify obstacles to the team approach and ways to overcome them. Methods: Eleven provider-pharmacist teams were recruited in rural/micropolitan communities in Iowa. The teams participated in team building sessions facilitated by the project leaders, to discuss the team approach. Decisions included patient identification, practitioner roles, and communications. Most pharmacists conducted blood pressure (BP checks in the pharmacy and assessed the anti-hypertensive medications. If the BP was not at goal, the pharmacist worked with the patient and provider to make improvements. Teams followed their strategies for 3-5 months. Data were collected from pharmacy logs and on-line surveys of team members before and after the team period. Results: Using a multi-case approach, 4 cases were classified as Worked-Well, 5 as Limited-Success, and 2 as No-Team-Care. The Worked-Well teams provided an average of 26.5 BP visits per team, while the Limited-Success teams averaged 6.8 BP visits. The Worked-Well teams established and used a system to support the team approach. The Limited-Success teams either didn't fully establish their team system, or used it sparingly. The No-Team-Care cases did not provide any team care. Conclusions: Factors supporting success were: positive provider-pharmacist relations, established team system, commitment to team care, and patient willingness to participate. While this program had some success, potential improvements were identified: more follow-up after the team building session, additional patient materials, and guidance for practice changes.   Type: Case Study

  2. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    Science.gov (United States)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  3. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  4. The power of a collaborative relationship between technical assistance providers and community prevention teams: A correlational and longitudinal study.

    Science.gov (United States)

    Chilenski, Sarah M; Perkins, Daniel F; Olson, Jonathan; Hoffman, Lesa; Feinberg, Mark E; Greenberg, Mark; Welsh, Janet; Crowley, D Max; Spoth, Richard

    2016-02-01

    Historically, effectiveness of community collaborative prevention efforts has been mixed. Consequently, research has been undertaken to better understand the factors that support their effectiveness; theory and some related empirical research suggests that the provision of technical assistance is one important supporting factor. The current study examines one aspect of technical assistance that may be important in supporting coalition effectiveness, the collaborative relationship between the technical assistance provider and site lead implementer. Four and one-half years of data were collected from technical assistance providers and prevention team members from the 14 community prevention teams involved in the PROSPER project. Spearman correlation analyses with longitudinal data show that the levels of the collaborative relationship during one phase of collaborative team functioning associated with characteristics of internal team functioning in future phases. Results suggest that community collaborative prevention work should consider the collaborative nature of the technical assistance provider - prevention community team relationship when designing and conducting technical assistance activities, and it may be important to continually assess these dynamics to support high quality implementation. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. Multi-professional audit supports clinical governance in projecting and implementing a new stroke care area

    Directory of Open Access Journals (Sweden)

    Marco Masina

    2013-03-01

    Full Text Available Patients with acute stroke have better outcomes in terms of survival or regaining independence if they receive organized inpatient care in a specific setting (Stroke Unit, SU where a coordinated multidisciplinary team can ensure the best level of care. The clinical governance of an SU requires a systematic monitoring of diagnostic, clinical and therapeutic processes through a structured audit. The entire project and set up of a new SU in Bentivoglio, Italy, were based on a model that focused on multidisciplinary teamwork and clinical governance. An audit based on the Benjamin audit cycle followed every step of the set up of the new SU. Markers from national and international guidelines and from the Italian Regional Audit, together with a specific database were used. The audit showed a high level of care and a significant improvement in the majority of clinical, diagnostic and therapeutic parameters. Only a few markers (i.e. waiting times for ultrasound tomography and prescription of oral anticoagulation therapy required specific projects in order to improve the results. Our experience confirmed that a structured audit can support clinical governance of an SU by monitoring clinical processes and quality of care. Such an audit involves the whole professional team and shows the effects of any single actions. It also helps integration and co-operation among staff. Furthermore, a structured audit is a useful instrument for professional accountability for both qualitative and quantitative aspects of care.

  6. Fleet Assistance and Support Team (FAST) Lab

    Data.gov (United States)

    Federal Laboratory Consortium — The FAST team was established by PMA-264 for introduction of multistatic ASW systems into the Fleet.FAST provides Air ASW mission planning, tactics/tactical sensor...

  7. Ubiquitous computing to support co-located clinical teams: using the semiotics of physical objects in system design.

    Science.gov (United States)

    Bang, Magnus; Timpka, Toomas

    2007-06-01

    Co-located teams often use material objects to communicate messages in collaboration. Modern desktop computing systems with abstract graphical user interface (GUIs) fail to support this material dimension of inter-personal communication. The aim of this study is to investigate how tangible user interfaces can be used in computer systems to better support collaborative routines among co-located clinical teams. The semiotics of physical objects used in team collaboration was analyzed from data collected during 1 month of observations at an emergency room. The resulting set of communication patterns was used as a framework when designing an experimental system. Following the principles of augmented reality, physical objects were mapped into a physical user interface with the goal of maintaining the symbolic value of those objects. NOSTOS is an experimental ubiquitous computing environment that takes advantage of interaction devices integrated into the traditional clinical environment, including digital pens, walk-up displays, and a digital desk. The design uses familiar workplace tools to function as user interfaces to the computer in order to exploit established cognitive and collaborative routines. Paper-based tangible user interfaces and digital desks are promising technologies for co-located clinical teams. A key issue that needs to be solved before employing such solutions in practice is associated with limited feedback from the passive paper interfaces.

  8. Resilient behaviour in innovation teams for better project results

    NARCIS (Netherlands)

    Oeij, P.R.A.

    2017-01-01

    Extenden abstract. Organising in a mindful way is a central aspect to making innovation teams become more resilient and enahnce their chances of innovation success. Such organising, called mindful infrastructure, implies creating the right conditions for teams to excel. Four elements are crucial to

  9. Team Performance Improvement: Mediating Roles of Employee Job Autonomy and Quality of Team Leader-Member Relations in Supportive Organizations in the Korean Business Context

    Science.gov (United States)

    Song, Ji Hoon

    2011-01-01

    The purpose of this research was to examine the mediating roles of job autonomy and the quality of the leader-member relationship to explain the impact of organizational support on team performance. A total of 228 cases collected from Korean business organizations were used for data analysis. Hierarchical multiple regression, Type 1 SS-based…

  10. CO-OP JIGSAW TEAM PROJECTS: A COOPERATIVE TEACHING METHOD TO IMPROVE STUDENTS‘ SPEAKING SKILL (An Experimental Study in a Senior High School

    Directory of Open Access Journals (Sweden)

    Diaz Innova Citra Arum

    2017-12-01

    Full Text Available An effective speaking activity involves active students to participate and create a life communication. The ideal condition of English speaking class involves the students‘ effectiveness in participating teaching and learning process. Nevertheless, some problems are emerged and one of them is that they often get nervous to speak in front of many people when they are asked to present their work to their friends. This paper reveals an experiment study in teaching speaking in a senior high school in Lamongan, East Java. It discusses about the effectiveness of cooperative teaching method known as coop jigsaw team projects in teaching speaking. All tenth grade students were used as the population and eighty students were taken as sample being divided into experimental group taught using coop jigsaw team projects and control group taught using direct instruction. Cluster random sampling was applied as the technique to determine sample. To obtain the data of students‘ speaking score, a speaking test was conducted. The score was the average score resulted by two independent examiners. The data were analysed through descriptive and inferential analysis using two-sample t-test. The research hypothesised that coop jigsaw will result a better English speaking score rather than direct instruction method. The research finding using 95% significance level shows that coop jigsaw team projects was more effective in teaching speaking compared to direct instruction for the tenth grade students because the activities in coop jigsaw team project pushed the students to be more active and cooperative in learning speaking.

  11. Design and Parametric Sizing of Deep Space Habitats Supporting NASA'S Human Space Flight Architecture Team

    Science.gov (United States)

    Toups, Larry; Simon, Matthew; Smitherman, David; Spexarth, Gary

    2012-01-01

    NASA's Human Space Flight Architecture Team (HAT) is a multi-disciplinary, cross-agency study team that conducts strategic analysis of integrated development approaches for human and robotic space exploration architectures. During each analysis cycle, HAT iterates and refines the definition of design reference missions (DRMs), which inform the definition of a set of integrated capabilities required to explore multiple destinations. An important capability identified in this capability-driven approach is habitation, which is necessary for crewmembers to live and work effectively during long duration transits to and operations at exploration destinations beyond Low Earth Orbit (LEO). This capability is captured by an element referred to as the Deep Space Habitat (DSH), which provides all equipment and resources for the functions required to support crew safety, health, and work including: life support, food preparation, waste management, sleep quarters, and housekeeping.The purpose of this paper is to describe the design of the DSH capable of supporting crew during exploration missions. First, the paper describes the functionality required in a DSH to support the HAT defined exploration missions, the parameters affecting its design, and the assumptions used in the sizing of the habitat. Then, the process used for arriving at parametric sizing estimates to support additional HAT analyses is detailed. Finally, results from the HAT Cycle C DSH sizing are presented followed by a brief description of the remaining design trades and technological advancements necessary to enable the exploration habitation capability.

  12. Supporting co-creation with software, the idSpace platform

    NARCIS (Netherlands)

    Van Rosmalen, Peter; Boon, Jo; Bitter-Rijpkema, Marlies; Sie, Rory; Sloep, Peter

    2014-01-01

    Innovation, in general, requires teamwork among specialist of different disciplines. The idSpace project developed ideas on how teams of collaborating innovators could best be supported. These ideas were embodied in a platform that the project developed. This idSpace platform allows its users to

  13. Every team needs a coach: Training for interprofessional clinical placements.

    Science.gov (United States)

    Grymonpre, Ruby; Bowman, Susan; Rippin-Sisler, Cathy; Klaasen, Kathleen; Bapuji, Sunita B; Norrie, Ola; Metge, Colleen

    2016-09-01

    Despite growing awareness of the benefits of interprofessional education and interprofessional collaboration (IPC), understanding how teams successfully transition to IPC is limited. Student exposure to interprofessional teams fosters the learners' integration and application of classroom-based interprofessional theory to practice. A further benefit might be reinforcing the value of IPC to members of the mentoring team and strengthening their IPC. The research question for this study was: Does training in IPC and clinical team facilitation and mentorship of pre-licensure learners during interprofessional clinical placements improve the mentoring teams' collaborative working relationships compared to control teams? Statistical analyses included repeated time analysis multivariate analysis of variance (MANOVA). Teams on four clinical units participated in the project. Impact on intervention teams pre- versus post-interprofessional clinical placement was modest with only the Cost of Team score of the Attitudes Towards Healthcare Team Scale improving relative to controls (p = 0.059) although reflective evaluations by intervention team members noted many perceived benefits of interprofessional clinical placements. The significantly higher group scores for control teams (geriatric and palliative care) on three of four subscales of the Assessment of Interprofessional Team Collaboration Scale underscore our need to better understand the unique features within geriatric and palliative care settings that foster superior IPC and to recognise that the transition to IPC likely requires a more diverse intervention than the interprofessional clinical placement experience implemented in this study. More recently, it is encouraging to see the development of innovative tools that use an evidence-based, multi-dimensional approach to support teams in their transition to IPC.

  14. Initiating and utilizing shared leadership in teams: The role of leader humility, team proactive personality, and team performance capability.

    Science.gov (United States)

    Chiu, Chia-Yen Chad; Owens, Bradley P; Tesluk, Paul E

    2016-12-01

    The present study was designed to produce novel theoretical insight regarding how leader humility and team member characteristics foster the conditions that promote shared leadership and when shared leadership relates to team effectiveness. Drawing on social information processing theory and adaptive leadership theory, we propose that leader humility facilitates shared leadership by promoting leadership-claiming and leadership-granting interactions among team members. We also apply dominance complementary theory to propose that team proactive personality strengthens the impact of leader humility on shared leadership. Finally, we predict that shared leadership will be most strongly related to team performance when team members have high levels of task-related competence. Using a sample composed of 62 Taiwanese professional work teams, we find support for our proposed hypothesized model. The theoretical and practical implications of these results for team leadership, humility, team composition, and shared leadership are discussed. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  15. Climate uniformity: its influence on team communication quality, task conflict, and team performance.

    Science.gov (United States)

    González-Romá, Vicente; Hernández, Ana

    2014-11-01

    We investigated whether climate uniformity (the pattern of climate perceptions of organizational support within the team) is related to task conflict, team communication quality, and team performance. We used a sample composed of 141 bank branches and collected data at 3 time points. The results obtained showed that, after controlling for aggregate team climate, climate strength, and their interaction, a type of nonuniform climate pattern (weak dissimilarity) was directly related to task conflict and team communication quality. Teams with weak dissimilarity nonuniform patterns tended to show higher levels of task conflict and lower levels of team communication quality than teams with uniform climate patterns. The relationship between weak dissimilarity patterns and team performance was fully mediated by team communication quality. (PsycINFO Database Record (c) 2014 APA, all rights reserved).

  16. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  17. A pleasure working together? : the effects of dissimilarity in team member conscientiousness on team temporal processes and individual satisfaction

    NARCIS (Netherlands)

    Gevers, J.M.P.; Peeters, M.A.G.

    2009-01-01

    In this study of 43 student project teams, we tested a multi-level mediation model of the relationship between dissimilarity in conscientiousness, team temporal processes, and team member satisfaction. We distinguished between individual-level dissimilarity in conscientiousness (i.e., the distance

  18. NIMROD: A Customer Focused, Team Driven Approach for Fusion Code Development

    Science.gov (United States)

    Karandikar, H. M.; Schnack, D. D.

    1996-11-01

    NIMROD is a new code that will be used for the analysis of existing fusion experiments, prediction of operational limits, and design of future devices. An approach called Integrated Product Development (IPD) is being used for the development of NIMROD. It is a dramatic departure from existing practice in the fusion program. Code development is being done by a self-directed, multi-disciplinary, multi-institutional team that consists of experts in plasma theory, experiment, computational physics, and computer science. Customer representatives (ITER, US experiments) are an integral part of the team. The team is using techniques such as Quality Function Deployment (QFD), Pugh Concept Selection, Rapid Prototyping, and Risk Management, during the design phase of NIMROD. Extensive use is made of communication and internet technology to support collaborative work. Our experience with using these team techniques for such a complex software development project will be reported.

  19. Impacts of dairy diagnostic teams on herd performance.

    Science.gov (United States)

    Weinand, D; Conlin, B J

    2003-05-01

    This study evaluated impacts of educational diagnostic teams of consultants used to transfer technology to dairy farms. Herd management performance changes were measured by comparing Dairy Herd Improvement data from 38 project farms to data from herds that were geographical contemporaries. The value of focused goals for effecting change was also assessed. Interviews provided producers' perception of project outcomes and insight on organization and conduct of dairy diagnostic teams. Changes observed in project herds were small compared with controls with tendencies for increased herd size and improved milk production per cow. Focused goals had greater impacts on increasing herd size, milk per cow, first lactation peak milk, reducing age at first calving, and percentages of cows with subclinical mastitis. Time, money, facility limitations, labor, and alternative priorities were the most cited constraints to implementing changes. Satisfaction scores of producers were significantly related to the degree that team recommendations were followed. Improved attitudes, quality of life, and financial well-being were benefits listed by a majority of producers from participation in the project. If similar projects were to be offered, 83% said they would participate again, and 69% indicated they would pay at least some of the costs. Project farms served as demonstration farms for 1930 other producers in their respective locales, resulting in a multiplier effect of original advice given by consultant teams. Suggestions by farmer participants for improvements in dairy diagnostic teams included needs for at least some unbiased team members, more frequent meetings, more follow-up on recommendations, and consistency of recommendations with family goals.

  20. Biomedical engineering education through global engineering teams.

    Science.gov (United States)

    Scheffer, C; Blanckenberg, M; Garth-Davis, B; Eisenberg, M

    2012-01-01

    Most industrial projects require a team of engineers from a variety of disciplines. The team members are often culturally diverse and geographically dispersed. Many students do not acquire sufficient skills from typical university courses to function efficiently in such an environment. The Global Engineering Teams (GET) programme was designed to prepare students such a scenario in industry. This paper discusses five biomedical engineering themed projects completed by GET students. The benefits and success of the programme in educating students in the field of biomedical engineering are discussed.

  1. Staff Turnover in Assertive Community Treatment (Act) Teams: The Role of Team Climate.

    Science.gov (United States)

    Zhu, Xi; Wholey, Douglas R; Cain, Cindy; Natafgi, Nabil

    2017-03-01

    Staff turnover in Assertive Community Treatment (ACT) teams can result in interrupted services and diminished support for clients. This paper examines the effect of team climate, defined as team members' shared perceptions of their work environment, on turnover and individual outcomes that mediate the climate-turnover relationship. We focus on two climate dimensions: safety and quality climate and constructive conflict climate. Using survey data collected from 26 ACT teams, our analyses highlight the importance of safety and quality climate in reducing turnover, and job satisfaction as the main mediator linking team climate to turnover. The findings offer practical implications for team management.

  2. Tagclouds and Group Cognition: Effect of Tagging Support on Students' Reflective Learning in Team Blogs

    Science.gov (United States)

    Xie, Ying; Lin, Shu-Yuan

    2016-01-01

    We investigated the effects of supported tagging (a prompting mechanism for students to stop and think about their writing) for team blogging on undergraduate students' reflective learning and the relationship between tagclouds and group cognition. Thirty-nine students were randomly assigned to six groups and blogged for 5 weeks. Three groups were…

  3. Changing Network Support for Drinking: Network Support Project 2-Year Follow-up

    Science.gov (United States)

    Litt, Mark D.; Kadden, Ronald M.; Kabela-Cormier, Elise; Petry, Nancy M.

    2009-01-01

    The Network Support Project was designed to determine whether a treatment could lead patients to change their social network from one that supports drinking to one that supports sobriety. This study reports 2-year posttreatment outcomes. Alcohol-dependent men and women (N = 210) were randomly assigned to 1 of 3 outpatient treatment conditions:…

  4. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  5. Shared Leadership and Team Creativity: A Social Network Analysis in Engineering Design Teams

    Directory of Open Access Journals (Sweden)

    Qiong Wu

    2016-06-01

    Full Text Available This research explores the relationship between shared leadership and creativity in engineering design teams. To do this, a social network perspective was adopted using four measures to assess key elements of shared leadership networks. These are (a network density, (b centralization, (c efficiency and (d strength. Data was collected from a sample of 22 engineering design teams who adopt a shared leadership approach. Our results support previous findings that the density of a shared leadership network is positively related to team creativity. In contrast, we learned that centralization exerts a negative influence on it. Moreover, while we found that there is no evidence to support a positive correlation between efficiency and team creativity, we demonstrate an inverted U-shaped relationship between strength and team creativity in a shared leadership network. These findings are important because they add to the academic debate in the shared leadership area and provide valuable insights for managers.

  6. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teaming concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.

  7. [The implementation of Individual Placement and Support in the Netherlands].

    Science.gov (United States)

    Giesen, F; van Erp, N; van Weeghel, J; Michon, H; Kroon, H

    2007-01-01

    Individual Placement and Support is a vocational rehabilitation programme for people with severe mental illness, which was implemented during the period 2003-2005 at four locations in the Netherlands. To investigate the degree of compliance with the Individual Placement and Support programme, the factors that hindered or facilitated its implementation, and the results. The degree of compliance was assessed using the Individual Placement and Support fidelity scale. Data regarding the factors that hindered or facilitated the implementation were collected via interviews and monitoring. In addition, data were collected on patient characteristics, the support provided and the jobs found. None of the locations achieved the highest level of compliance, although two locations came close. Eighteen per cent of the 316 patients were helped to find a regular job. The most important obstacles to implementation were loss of vocational team members, project leaders' lack of time, lack of finance, and insufficient cooperation between the organisations involved. The most important facilitating factors were the skills and commitment of the vocational team member(s) and the integration of the vocational teammember(s) and the mental health team. It is not easy to implement Individual Placement and Support. However, if more attention is given to good project management, Individual Placement and Support can succeed in the Netherlands.

  8. Improving Engineering Student Team Collaborative Discussions by Moving Them Online: An Investigation of Synchronous Chat and Face-to-Face Team Conversations

    Science.gov (United States)

    Fowler, Robin Revette

    2014-01-01

    Collaborative learning, particularly in the context of team-based, project-based learning, is common in undergraduate engineering education and is associated with deeper learning and enhanced student motivation and retention. However, grouping students in teams for project-based learning sometimes has negative outcomes, which can include lowered…

  9. Task conflict and team creativity: a question of how much and when.

    Science.gov (United States)

    Farh, Jiing-Lih; Lee, Cynthia; Farh, Crystal I C

    2010-11-01

    Bridging the task conflict, team creativity, and project team development literatures, we present a contingency model in which the relationship between task conflict and team creativity depends on the level of conflict and when it occurs in the life cycle of a project team. In a study of 71 information technology project teams in the greater China region, we found that task conflict had a curvilinear effect on team creativity, such that creativity was highest at moderate levels of task conflict. Additionally, we found this relationship to be moderated by team phase, such that the curvilinear effect was strongest at an early phase. In contrast, at later phases of the team life cycle, task conflict was found to be unrelated to team creativity. (c) 2010 APA, all rights reserved.

  10. Regulatory research and support program for 1988/89 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-15

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information.

  11. Regulatory research and support program for 1988/89 - project descriptions

    International Nuclear Information System (INIS)

    1988-01-01

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information

  12. Introducing embedded indigenous psychological support teams: a suggested addition to psychological first aid in an international context.

    Science.gov (United States)

    Edwards-Stewart, Amanda; Ahmad, Zeba S; Thoburn, John W; Furman, Rich; Lambert, Ashly J; Shelly, Lauren; Gunn, Ginger

    2012-01-01

    The current article introduces Embedded Indigenous Psychological Support Teams (IPST) as a possible addition to current disaster relief efforts. This article highlights psychological first aid in an international context by drawing on mainstream disaster relief models such as The American Red Cross, Critical Incident Stress Management, and Flexible Psychological First Aid. IPST are explained as teams utilizing techniques from both CISM and FPFA with a focus on resiliency. It is currently theorized that in utilizing IPST existing disaster relief models may be more effective in mitigating negative physical or mental health consequences post-disaster.

  13. Introducing a New Concept Inventory on Climate Change to Support Undergraduate Instruction, Teacher Education, Education Research, and Project Evaluation (Invited)

    Science.gov (United States)

    Morrow, C. A.; Monsaas, J.; Katzenberger, J.; Afolabi, C. Y.

    2013-12-01

    The Concept Inventory on Climate Change (CICC) is a new research-based, multiple-choice 'test' that provides a powerful new assessment tool for undergraduate instructors, teacher educators, education researchers, and project evaluators. This presentation will describe the features and the development process of the (CICC). This includes insights about how the development team (co-authors) integrated and augmented their multi-disciplinary expertise. The CICC has been developed in the context of a popular introductory undergraduate weather and climate course at a southeastern research university (N~400-500 per semester). The CICC is not a test for a grade, but is intended to be a useful measure of how well a given teaching and learning experience has succeeded in improving understanding about climate change and related climate concepts. The science content addressed by the CICC is rooted in the national consensus document, 'Climate Literacy: The Essential Principles of Climate Science'. The CICC has been designed to support undergraduate instruction, and may be valuable in comparable contexts that teach about climate change. CICC results can help to inform decisions about the effectiveness of teaching strategies by 1) flagging conceptual issues (PRE-instruction); and 2) detecting conceptual change (POST-instruction). Specific CICC items and their answer choices are informed by the research literature on common misunderstandings about climate and climate change. Each CICC item is rated on a 3-tier scale of the cognitive sophistication the item is calling for, and there is a balance among all three tiers across the full instrument. The CICC development process has involved data-driven changes to successive versions. Data sources have included item statistics from the administration of progressively evolved versions of the CICC in the weather and climate course, group interviews with students, and expert review by climate scientists, educators, and project evaluators

  14. Pedagogical innovation in teacher teams

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2015-01-01

    This paper presents findings from a longitudinal design-based research project examining how to enable reflection and pedagogical innovation in teacher teams. The article identifies and analyses the teachers’ learning trajectories and innovative strategies when working together in the IT...... learning designs, the research aims to clarify what kind of knowledge is being developed and shared in the teacher teams, and how this contributes to the organisational learning process. The context is Global Classroom, an innovative synchronous hybrid videoconference concept, where adult students can......-pedagogical Think Tank for Teacher Teams (after this: ITP4T) (Weitze, 2014a), a competence development model, which was developed in an earlier phase of the research project. By using theoretical lenses from innovative knowledge development frameworks to examine the teachers’ utterances, interactions and new...

  15. Broadening participation in Research Experiences for Undergraduates (REU) programs: an evaluation of the team research model for undergraduate research experiences

    Science.gov (United States)

    Berthelote, A. R.; Geraghty Ward, E. M.; Dalbotten, D. M.

    2014-12-01

    The REU site on sustainable land and water resources has a goal of broadening participation in the geosciences by underrepresented groups and particularly Native American students. We are evaluating modifications to the traditional REU model in order to better support these students. First, we review a team research model for REU students, where students are placed on teams and work together in peer groups supported by a team of mentors. Second, the REU takes place in locations that have high populations of Native American students to remove barriers to participation for non-traditional students. Finally, the teams do research on issues related to local concerns with cultural focus. Traditional REU models (1 faculty to 1 student/on campus) have been shown to be effective in supporting student movement into graduate programs but often fail to attract a diverse group of candidates. In addition, they rely for success on the relationship between faculty and student, which can often be undermined by unrealistic expectations on the part of the student about the mentor relationship, and can be exacerbated by cultural misunderstanding, conflicting discourse, or students' personal or family issues. At this REU site, peer mentorship and support plays a large role. Students work together to select their research question, follow the project to completion and present the results. Students from both native and non-native backgrounds learn about the culture of the partner reservations and work on a project that is of immediate local concern. The REU also teaches students protocols for working on Native American lands that support good relations between reservation and University. Analysis of participant data gathered from surveys and interview over the course of our 3-year program indicates that the team approach is successful. Students noted that collaborating with other teams was rewarding and mentors reported positively about their roles in providing guidance for the student

  16. Working with 'hands-off' support: a qualitative study of multidisciplinary teams' experiences of home rehabilitation for older people.

    Science.gov (United States)

    Randström, Kerstin Björkman; Wengler, Yvonne; Asplund, Kenneth; Svedlund, Marianne

    2014-03-01

    There is a move towards the provision of rehabilitation for older people in their homes. It is essential to ensure that rehabilitation services promote independence of older people. The aim of the study was to explore multidisciplinary teams' experiences of home rehabilitation for older people. Five focus groups were conducted with multidisciplinary teams based in a municipality in Sweden, covering seven different professions. In total, 28 participants volunteered to participate in these interviews. Interviews were transcribed verbatim and analysed according to content analysis. Two main categories, as well as four subcategories, emerged. The first main category, having a rehabilitative approach in everyday life, consisted of the subcategories: 'giving 'hands-off' support' and 'being in a home environment'. The second main category, working across professional boundaries, consisted of the subcategories: 'coordinating resources' and 'learning from each other'. Common goals, communication skills and role understanding contributed to facilitating the teams' performances of rehabilitation. A potential benefit of home rehabilitation, because the older person is in a familiar environment, is to work a rehabilitative approach into each individual's activity in their everyday life in order to meet their specific needs. At an organisational level, there is a need for developing services to further support older people's psychosocial needs during rehabilitation. Team performance towards an individual's rehabilitation should come from an emerged whole and not only from the performance of a specific professional approach depending on the traditional role of each profession. A rehabilitative approach is based on 'hands-off' support in order to incorporate an individual's everyday activities as a part of their rehabilitation. © 2012 Blackwell Publishing Ltd.

  17. Technology Applications Team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    Highlights of the Research Triangle Institute (RTI) Applications Team activities over the past quarter are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. The authors gratefully acknowledge the contributions of many individuals to the RTI Technology Applications Team program. The time and effort contributed by managers, engineers, and scientists throughout NASA were essential to program success. Most important to the program has been a productive working relationship with the NASA Field Center Technology Utilization (TU) Offices. The RTI Team continues to strive for improved effectiveness as a resource to these offices. Industry managers, technical staff, medical researchers, and clinicians have been cooperative and open in their participation. The RTI Team looks forward to continuing expansion of its interaction with U.S. industry to facilitate the transfer of aerospace technology to the private sector.

  18. Exploring the concept of a team approach to wound care: Managing wounds as a team.

    Science.gov (United States)

    Moore, Zena; Butcher, Gillian; Corbett, Lisa Q; McGuiness, William; Snyder, Robert J; van Acker, Kristien

    2014-05-01

    Background - The growing prevalence and incidence of nonhealing acute and chronic wounds is a worrying concern. A major challenge is the lack of united services aimed at addressing the complex needs of individuals with wounds. However, the WHO argues that interprofessional collaboration in education and practice is key to providing the best patient care, enhancing clinical and health-related outcomes and strengthening the health system. It is based on this background that the team approach to wound care project was conceptualised. The project was jointly initiated and realised by the Association for the Advancement of Wound Care (AAWC-USA), the Australian Wound Management Association (AWMA) and the European Wound Management Association (EWMA). Aim - The aim of this project was to develop a universal model for the adoption of a team approach to wound care. Objective The overarching objective of this project was to provide recommendations for implementing a team approach to wound care within all clinical settings and through this to develop a model for advocating the team approach toward decision makers in national government levels. Method An integrative literature review was conducted. Using this knowledge, the authors arrived at a consensus on the most appropriate model to adopt and realise a team approach to wound care. Results - Eighty four articles met the inclusion criteria. Following data extraction, it was evident that none of the articles provided a definition for the terms multidisciplinary, interdisciplinary or transdisciplinary in the context of wound care. Given this lack of clarity within the wound care literature, the authors have here developed a Universal Model for the Team Approach to Wound Care to fill this gap in our current understanding. Conclusion - We advocate that the patient should be at the heart of all decision-making, as working with the Universal Model for the Team Approach to Wound Care begins with the needs of the patient. To

  19. Development of an Integrated Team Training Design and Assessment Architecture to Support Adaptability in Healthcare Teams

    Science.gov (United States)

    2016-10-01

    chosen for their expertise and to ensure geographical representation. COMPLETED Human Research Protection Office IRB 3 The HRPO has granted exempt... taxonomy (Figure 3) can help guide the selection of appropriate training targets and can help educators target correct task complexity, appropriate...team assessment. We extended this knowledge by investigating the team science, safety science, and human factors literature. Because our work

  20. Data Teams for School Improvement

    Science.gov (United States)

    Schildkamp, Kim; Poortman, Cindy L.; Handelzalts, Adam

    2016-01-01

    The use of data for educational decision making has never been more prevalent. However, teachers and school leaders need support in data use. Support can be provided by means of professional development in the form of "data teams". This study followed the functioning of 4 data teams over a period of 2 years, applying a qualitative case…

  1. Recent Experiences of the NASA Engineering and Safety Center (NESC) GN and C Technical Discipline Team (TDT)

    Science.gov (United States)

    Dennehy, Cornelius J.

    2010-01-01

    The NASA Engineering and Safety Center (NESC), initially formed in 2003, is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. The GN&C Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe selected recent experiences, over the period 2007 to present, of the GN&C TDT in which they directly performed or supported a wide variety of NESC assessments and consultations.

  2. Evaluating team-based inter-professional advanced life support training in intensive care-a prospective observational study.

    Science.gov (United States)

    Brewster, D J; Barrett, J A; Gherardin, E; O'Neill, J A; Sage, D; Hanlon, G

    2017-01-01

    Recent focus on national standards within Australian hospitals has prompted a focus on the training of our staff in advanced life support (ALS). Research in critical care nursing has questioned the traditional annual certification of ALS competence as the best method of delivering this training. Simulation and team-based training may provide better ALS education to intensive care unit (ICU) staff. Our new inter-professional team-based advanced life support program involved ICU staff in a large private metropolitan ICU. A prospective observational study using three standardised questionnaires and two multiple choice questionnaire assessments was conducted. Ninety-nine staff demonstrated a 17.8% (95% confidence interval 4.2-31, P =0.01) increase in overall ICU nursing attendance at training sessions. Questionnaire response rates were 93 (94%), 99 (100%) and 60 (61%) respectively; 51 (52%) staff returned all three. Criteria were assessed by scores from 0 to 10. Nurses reported improved satisfaction with the education program (9.4 to 7.1, P versus 7.9 and 8.2, P versus 7.4 and 7.8, P versus 8.1, P =0.04). The new program cost approximately an extra $16,500 in nursing salaries. We concluded that team-based, inter-professional ALS training produced statistically significant improvements in nursing attendance, satisfaction with ALS education, confidence and role understanding compared to traditional ALS training.

  3. Forming Student Online Teams for Maximum Performance

    Science.gov (United States)

    Olson, Joel D.; Ringhand, Darlene G.; Kalinski, Ray C.; Ziegler, James G.

    2015-01-01

    What is the best way to assign graduate business students to online team-based projects? Team assignments are frequently made on the basis of alphabet, time zones or previous performance. This study reviews personality as an indicator of student online team performance. The personality assessment IDE (Insights Discovery Evaluator) was administered…

  4. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  5. Developing Communities of Practice around e-Learning and Project Management

    Science.gov (United States)

    Laxton, Ruth; Applebee, Andrelyn Cheryl

    2010-01-01

    In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…

  6. Volunteer Team Management

    OpenAIRE

    Monych, Maria

    2015-01-01

    This thesis looked into volunteer team management in a project in AIESEC in Finland through the action research method. AIESEC in Finland is a non-profit non-government organization with a purpose of “peace and fulfilment of humankinds potential” through development of the youth’s future leadership. AIESEC was not a commissioning party; the project was the basis for the thesis without the supervision of the company. The thesis is based on a project that the author was in charge of, in ...

  7. Multicultural Ground Teams in Space Programs

    Science.gov (United States)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  8. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  9. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  10. DEVELOPMENT OF THE STATE SUPPORT FORMS PROJECTS IN INDUSTRIAL BUILDING

    Directory of Open Access Journals (Sweden)

    I. M. Meilanov

    2016-01-01

    Full Text Available Aim. The topicality of the research is stipulated by the objective necessity of the organizational and economic mechanism improvement of the state support projects of the industrial building. The aim of the research is the development of conceptual provisions and methodological foundations of financial projects creating conditions for economic growth of Russia based on the construction and putting into effect industrial objects.Methods. In the course of the research the system, subject-functional and structural approaches were implemented to solve the problems set widening the scope of the complex approach to assessment of the current operating mechanism of the state financial support of the projects and financial volume; to criteria stipulation of the most effective projects contest selection: to the search of the investment resources accumulation instrument into industrial building.Results. It is stipulated that state investment policy in industrial building mechanism oriented to define rational investment volumes and their branch, reproductive, technological and territorial structure; option of the building branch development priority; increase of the investment projects efficiency realization. The dynamics of the state support in the form of subsidies and budget investments into creation of the industrial building objects is analytically summarized. It is determined that the peculiarity of the modern state support projects of industrial building is transition from budget allocations distribution between branches and regions to selective and partial financing of specific investment projects on competitive basis. Some tactics of state and private partnership attracting private capital without losing strategic state control under systems and objects are defined. As an effective form of the industrial building support projects it is proposed to use a concession model form: projecting - building- financing- ownership - exploitation

  11. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  12. Burden Experienced by Family Caregivers of Patients at the End of Life: What do General Practice Teams Offer?

    Science.gov (United States)

    Krug, K; Bölter, R; Ballhausen, R A; Engeser, P; Peters-Klimm, F

    2016-09-01

    The aim of the study: was to determine how far general practice teams are prepared to relieve family caregivers of palliative patients from their caregiving burden, the support they actually offer, and where they identify needs for improvement. Method: Focus groups and interviews on the issues of identification and support of family caregivers were conducted with practice teams (general practitioners, GPs, and medical assistants, MAs) and the results qualitatively analyzed. Results: 21 participants (14 GPs, 7 MAs) from 13 practices identified burdened family caregivers, thereupon offered support and provided contact details to local consultation services. They suggested to family caregivers that they should use their social network to create room for meeting their own needs. Conclusions: Practice teams use a multitude of individualized and unsystematic approaches to support family caregivers. In further studies within the framework of this project, systematic approaches will be identified and tried out. © Georg Thieme Verlag KG Stuttgart · New York.

  13. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  14. Exploring the Role of Social Software in Global Software Development Projects

    DEFF Research Database (Denmark)

    Giuffrida, Rosalba; Dittrich, Y.

    2011-01-01

    We present a PhD project that investigates the use of Social Software (SoSo) in Global Software Development (GSD) teams. Since SoSo in unstructured and informal in its own nature, we explore how informal communication, which is challenging in GSD, is supported by SoSo in distributed teams and how...

  15. The Team to Address Bariatric Care in Canadian Children (Team ABC3): Team Grant Research Proposal.

    Science.gov (United States)

    2017-10-05

    Severe obesity (SO) in Canadian children remains poorly understood. However, based on international data, the prevalence of SO appears to be increasing and is associated with a number of psychosocial, bio-mechanical, and cardiometabolic health risks. The purpose of our national Team to Address Bariatric Care in Canadian Children (Team ABC3) is to develop and lead a series of inter-related studies to enhance the understanding and management of SO in Canadian children and adolescents (0-18 years). From 2015 to 2019, Team ABC3 will conduct a series of projects at the regional, provincial, and national levels using multiple methods and study designs to respond to key knowledge gaps by (i) generating evidence on the prevalence of SO and its impact on health services utilization in children using existing Canadian data sources from primary care settings, (ii) exploring contemporary definitions of SO that link with health outcomes, (iii) comparing and contrasting health risks across the continuum of SO, (iv) understanding potential barriers to and facilitators of treatment success in children with SO, and (v) examining innovative lifestyle and behavioral interventions designed to successfully manage SO in children and their families. Furthermore, to examine the impact of innovative interventions on the management SO, we will (vi) evaluate whether adding a health coach, who provides support via text, email, and/or phone, improves children's ability to adhere to a web-based weight management program and (vii) test the feasibility and impact of a community-based weight management program for pre-school children with SO and their parents that combines group-based parenting sessions with in-home visits. Our research aligns with national priorities in obesity research, brings together leading scientists, clinicians, and stakeholders from across Canada, and will inform health services delivery throughout the country to provide the best care possible for children with SO and

  16. Assessing the impact on intercultural competencies when engineering students solve problems in multicultural teams

    DEFF Research Database (Denmark)

    Jensen, Lars Peter; Nygaard, Bjørn; Madsen, Linda

    2011-01-01

    solving problems in teams two times a year in all of their bachelor education. In at least four of the engineering education institutes in Denmark experiments on helping mixed student teams to perform better in their project work have been carried out for some years using a classic engineering trial......’ intercultural competencies. It was decided to start a formal research project to investigate some of the existing experiments helping mixed teams to cope with project work in intercultural teams. During spring 2010 the setup for the research project was developed by a group of representatives from...... as exchange students or to take a full degree. Project organized Problem based Learning is used to a high extent at most of the engineering educations in Denmark, using large scale project work (up to 15 ECTS each semester) solved in teams (3-7 students in each team). In more and more situations the teams...

  17. Supporting project awareness on the WWW with the iScent framework

    DEFF Research Database (Denmark)

    Anderson, Kenneth Mark; Bouvin, Niels Olof

    2000-01-01

    of information evolving on an Internet scale, and to address the problems and challenges mentioned above, we present a framework to support awareness and intersubjectivity among software team members through the use of automatically collected, hypermedia-enabled event trails. The concepts, techniques, and tools...

  18. Developing leadership in rural interprofessional palliative care teams.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Handfield-Jones, Richard; Bouvette, Maryse

    2008-01-01

    This project brought together community-based practitioners and academics to develop and deliver interventions designed to enhance the leadership abilities of the designated leaders of seven rural/small town-based palliative care teams. Members of these community-based teams have already gained recognition for their teams' leadership and service delivery in their communities. All of the teams had worked closely with most members of the academic team prior to this project. The team members participated in a needs assessment exercise developed by the Sisters of Charity of Ottawa Health Service and University of Ottawa academic team. Results of the needs assessment identified leadership qualities that had contributed to their success, as well as their needs to further enhance their individual leadership qualities. The team effort, however, was the most important factor contributing to the success of their work. The interventions developed to address the identified needs had to be adapted creatively through the collaborative efforts of both the community and academic teams. The educational interventions facilitated the integration of learning at the individual and community level into the busy work schedules of primary health care providers.

  19. Gender and tenure diversity in GitHub teams

    NARCIS (Netherlands)

    Vasilescu, B.N.; Posnett, D.; Ray, B.; Brand, van den M.G.J.; Serebrenik, A.; Devanbu, P.; Filkov, V.

    2015-01-01

    Software development is usually a collaborative venture. Open Source Software (OSS) projects are no exception; indeed, by design, the OSS approach can accommodate teams that are more open, geographically distributed, and dynamic than commercial teams. This, we find, leads to OSS teams that are quite

  20. [Team Collaboration in Home Medical Care to Support Patients at the End-of-Life - Review of Service Personnel Meeting on Discharge Day].

    Science.gov (United States)

    Ogiwara, Miyoko; Irino, Hiromi; Yamaoka, Keita; Fujimaki, Yoko; Watanabe, Mutsuko; Yamamoto, Takeshi; Hirohara, Masayoshi; Kushida, Kazuki

    2018-03-01

    Due to the rising number of patients at the terminal stage or with high dependence on medical care, the cooperation of 2 teams, the hospital discharge support team and the home support team, has become very important. The recent spread of the Internet has enabled both patients and their families who have chosen home care to obtain a wide range of information about home services, as well as diseases, and form a picture of what will happen. However, there are actually many cases in which patients and families find that things are not as they imagined, and they are uneasy and unsure of what to do. Here, we report a case in which the mismatch between the patient's and family's expectations created an unsatisfactory care situation.

  1. Toward Project-based Learning and Team Formation in Open Learning Environments

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2014-01-01

    Open Learning Environments, MOOCs, as well as Social Learning Networks, embody a new approach to learning. Although both emphasise interactive participation, somewhat surprisingly, they do not readily support bond creating and motivating collaborative learning opportunities. Providing project-based

  2. Nutrition Support Team Guide to Maternal Diet for the Human-Milk-Fed Infant.

    Science.gov (United States)

    Copp, Kathleen; DeFranco, Emily A; Kleiman, Jeanne; Rogers, Lynette K; Morrow, Ardythe L; Valentine, Christina J

    2018-03-30

    Human milk feeding is encouraged for all infants; however, the mammary gland depends on maternal dietary intake of vitamins A, B1, B2, B6, B12, D, docosahexaenoic acid (DHA), choline, and iodine. Nutrition support team knowledge of maternal feeding guidelines for these nutrient sources can therefore impact infant intake. We hypothesized that these key nutrients for lactation in the mother's diet would be less than the dietary guidelines in the United States. This was a secondary analysis of nutrition data collected during a randomized, controlled trial. Dietary records were analyzed from 16 mothers (13 with singleton and 3 with multiple births) completing the study. Mean dietary intakes of selected nutrients were calculated and compared with the current dietary reference intakes. Mean maternal dietary intake for singletons was significantly (P vitamin A (58%), vitamin D (44%), and choline (58%);) DHA comprised only 5% of the current expert recommendation. Based on singleton recommendations, mothers to twins consumed an adequate intake except for DHA. Women providing breast milk for singleton preterm infants did not consume dietary reference intakes for key nutrients. Twin mothers' diets were adequate except for DHA, but these guidelines are based on singleton pregnancies and remain poorly understood for twin needs. The nutrition support team can have a unique role in maternal dietary education to impact human milk nutrient delivery to the infant. © 2018 American Society for Parenteral and Enteral Nutrition.

  3. Longitudinal observations of globally distributed design teams: The impacts on Product Development

    DEFF Research Database (Denmark)

    Taylor, Thomas Paul; Ahmed-Kristensen, Saeema

    2015-01-01

    Factors impacting the success of Product Development (PD) projects are intensified when teams are distributed globally, making it a challenging task for project management to deal with effects on time, cost and quality. It is important for project management to understand when challenges......, such as communication difficulties, a lack of common vision between team members or issues related to documentation, may occur during PD projects, enabling them to take the necessary preventative action (Edmondson and Nembhard, 2009). When investigating factors impacting the success of PD, the majority of research...... studies of globally distributed design teams in PD projects. This paper aims to contribute to the further understanding of the factors impacting the success of PD projects when teams are distributed globally. With the results from a longitudinal observational study over 8 months, the factors impacting...

  4. Supportive Supervision: Meeting to Build Interdisciplinary Teams in the Northern Central Regional Office of the CEN CINAI

    Directory of Open Access Journals (Sweden)

    Georgianella Araya-Alegría

    2015-01-01

    Full Text Available This article is the result of a participatory action research project aimed at providing a novel approach for the Northern Central Regional Office of the CEN CINAI [Education and Nutrition Centers (CEN and the Children’s Nutrition and Comprehensive Care Centers (CINAI] to build knowledge on an unfinished process: “Supportive Supervision” (supervisión capacitante.  Based on a naturalistic premise, we tried to answer a question that guided us in the group creation and transformation, switching our meetings from a vertical standpoint to a horizontal relationship providing accompaniment, support and construction, as well as analysis and reflection. The article shows the aspects that justified the development of the participative action research process under a methodological proposal that involves those of us who participated and contributed to build knowledge with our experience and from different locations within the Region.  A total of 29 professionals participated, willing to jointly meet a purpose: construct knowledge based on team work and on a process full of uncertainty that encourages us to constantly revise what has already been built and enables us to re-read and retake what has already been written and to systematize what could not be written before. In order words, to make this process a new way of developing knowledge that implies a more concrete standpoint to understand what “Supportive Supervision” is and how it is done, with the purpose of always looking for improvement within the National Directorate of CEN CINAI.

  5. How and Why Do Top Managers Support or Not Support Strategic IS Projects?

    NARCIS (Netherlands)

    Boonstra, A.; CruzCunha, MM; Varajao, J; Powell, P; Martinho, R

    2011-01-01

    There is much evidence that top management support is the single most important determinant of IS project success. This is especially the case in complex and large-scale IS projects. Surprisingly however, despite its crucial importance there is only limited knowledge of the types of behaviour

  6. Implementation of Multiple Intelligences Supported Project-Based Learning in EFL/ESL Classrooms

    Science.gov (United States)

    Bas, Gokhan

    2008-01-01

    This article deals with the implementation of Multiple Intelligences supported Project-Based learning in EFL/ESL Classrooms. In this study, after Multiple Intelligences supported Project-based learning was presented shortly, the implementation of this learning method into English classrooms. Implementation process of MI supported Project-based…

  7. Creating a culture to support patient safety. The contribution of a multidisciplinary team development programme to collaborative working.

    Science.gov (United States)

    Benson, Anne

    2010-01-01

    Effective teamwork is crucial for ensuring the provision of safe high quality care. Teams whose members collaborate through questioning, reflecting on and reviewing their work, offering each other feedback and where reporting is encouraged are more likely to promote a safe environment of care. This paper describes a multidisciplinary development programme intended to increase team effectiveness. The teams that took part developed their ability to work collaboratively together with levels of open dialogue, critical reflection and direct feedback increasing. The paper goes on to discuss aspects of the programme which were helpful in enabling these positive changes and concludes with a number of recommendations for those commissioning and facilitating team development initiatives. These include: the need for people from different disciplines and different levels within the hierarchy to spend time reviewing their work together, the need to explicitly address issues of power and authority, the usefulness taking an action orientated approach and requiring participants to work on real issues together, the importance of providing sufficient time and resource to support people to work with the challenges associated with implementing change and addressing team dynamics, The importance of skilled facilitation.

  8. Multidisciplinary safety team (MDST) factors of success.

    Science.gov (United States)

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  9. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  10. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  11. The role of justice in team member satisfaction with the leader and attachment to the team.

    Science.gov (United States)

    Phillips, J M; Douthitt, E A; Hyland, M M

    2001-04-01

    This study examined the effects of team decision accuracy, team member decision influence, leader consideration behaviors, and justice perceptions on staff members' satisfaction with the leader and attachment to the team in hierarchical decision-making teams. The authors proposed that staff members' justice perceptions would mediate the relationship between (a) team decision accuracy, (b) the amount of influence a staff member has in the team leader's decision, and (c) the leader's consideration behaviors and staff attachment to the team and satisfaction with the leader. The results of an experiment involving 128 participants in a total of 64 teams, who made recommendations to a confederate acting as the team leader, generally support the proposed model.

  12. Interprofessional team building in the palliative home care setting: Use of a conceptual framework to inform a pilot evaluation.

    Science.gov (United States)

    Shaw, James; Kearney, Colleen; Glenns, Brenda; McKay, Sandra

    2016-01-01

    Home-based palliative care is increasingly dependent on interprofessional teams to deliver collaborative care that more adequately meets the needs of clients and families. The purpose of this pilot evaluation was to qualitatively explore the views of an interprofessional group of home care providers (occupational therapists, nurses, personal support work supervisors, community care coordinators, and a team coordinator) regarding a pilot project encouraging teamwork in interprofessional palliative home care services. We used qualitative methods, informed by an interprofessional conceptual framework, to analyse participants' accounts and provide recommendations regarding strategies for interprofessional team building in palliative home health care. Findings suggest that encouraging practitioners to share past experiences and foster common goals for palliative care are important elements of team building in interprofessional palliative care. Also, establishing a team leader who emphasises sharing power among team members and addressing the need for mutual emotional support may help to maximise interprofessional teamwork in palliative home care. These findings may be used to develop and test more comprehensive efforts to promote stronger interprofessional teamwork in palliative home health care delivery.

  13. Women supporting women: Networked civic engagement to foster ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    “Women supporting Women” is an applied research project led by Fundación ... It will build a participatory governance structure and a learning community integrated ... of female community leaders, and an executive team based at Fundación.

  14. Concurrent Mission and Systems Design at NASA Glenn Research Center: The Origins of the COMPASS Team

    Science.gov (United States)

    McGuire, Melissa L.; Oleson, Steven R.; Sarver-Verhey, Timothy R.

    2012-01-01

    Established at the NASA Glenn Research Center (GRC) in 2006 to meet the need for rapid mission analysis and multi-disciplinary systems design for in-space and human missions, the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team is a multidisciplinary, concurrent engineering group whose primary purpose is to perform integrated systems analysis, but it is also capable of designing any system that involves one or more of the disciplines present in the team. The authors were involved in the development of the COMPASS team and its design process, and are continuously making refinements and enhancements. The team was unofficially started in the early 2000s as part of the distributed team known as Team JIMO (Jupiter Icy Moons Orbiter) in support of the multi-center collaborative JIMO spacecraft design during Project Prometheus. This paper documents the origins of a concurrent mission and systems design team at GRC and how it evolved into the COMPASS team, including defining the process, gathering the team and tools, building the facility, and performing studies.

  15. Trust in agile teams

    DEFF Research Database (Denmark)

    Tjørnehøj, Gitte; Fransgård, Mette; Skalkam, Signe

    2012-01-01

    actions influenced this. We see two important lessons from the analysis. First the agile practices of daily Scrum and self organizing team can empower DSD teams to manage their own development of trust and thereby alleviate the obstacles of DSD. Second if management fails to support the development...

  16. Team Work and Democratic Learning in Projectmanagement Training

    DEFF Research Database (Denmark)

    Lidon, Ivan; Rebollar, Ruben; Qvist, Palle

    of Zaragoza, which makes it possible to detect problems of teamwork functioning in groups while they develop their projects, in order to prevent possible failure once projects are completed. The Democratic Learning Questionnaire developed at Aalborg University, which studies the decision-making process within...... it possible to establish a correlation between a group's decision making process and the quality of its functioning as a team.......Project Management is a discipline of a basically professional nature. Training in Project Management must provide students with a series of professional competencies, among which teamwork stands out as one of the most important, since all projects, by definition, must be carried out by teams...

  17. Team-oriented leadership: The interactive effects of leader group prototypicality, accountability, and team identification

    NARCIS (Netherlands)

    Giessner, S.R.; van Knippenberg, D.; van Ginkel, W.; Sleebos, E.

    2013-01-01

    We examined the interactive effects of leader group prototypicality, accountability, and team identification on team-oriented behavior of leaders, thus extending the social identity perspective on leadership to the study of leader behavior. An experimental study (N = 152) supported our hypothesis

  18. Is the support that dental registrants in difficulty receive from postgraduate dental teams and other sources adequate?

    Science.gov (United States)

    Pearce, M; Agius, S J; Macfarlane, J; Taylor, N

    2017-05-26

    Objective The aim of this research was to investigate the views of dental registrants in difficulty (DRiDS) on the support they received from postgraduate dental teams (PgDT) in Health Education England (HEE) and other sources. These data were complemented by the views of those appointed from the PgDT to support them on the service they provide.Method Qualitative data were collected by recording one-to-one semi structured telephone interviews, lasting approximately 30 minutes, with registrants in difficulty and supporters purposefully sampled from across England and Wales. Recordings were transcribed and the interview data analysed for recurring discourses and themes using thematic framework analysis.Setting and subjects All regional leads for DRiDs services in PgDT across the UK were asked to invite the DRiDs they were in contact with and the supporters they had appointed to contact the research team. Attempts were made to contact all who returned consent forms and six DRiDs and 11 supporters were eventually interviewed.Results Overall the DRiDs thought that the PgDT were very helpful. They were in many cases the only source of expert support and advice, particularly with regard to developing a personal development plan and collecting evidence about their practice to present to the regulator. There was a good match between the qualities that DRiDs wanted their supporters to have and the strengths supporters felt they brought to the role. The DRiDs had mixed views about the support provided by their indemnifiers and could not identify any other organisations that provided support once conditions had been imposed. Some had the support of peers; but both DRiDs and supporters felt there was a need for further support in addition to the educational support provided by PgDT and legal support provided by the indemnifier.Conclusion The DRiDS regarded the PgDT as their primary source of support and, in general, were very satisfied with the character and competence of the

  19. Telematic Tools to Support Group Projects in Higher Education

    NARCIS (Netherlands)

    van der Veen, Johan (CTIT); Collis, Betty

    We describe ongoing evaluations and new research on the use of telematic tools to support project work in higher education. Practical experience at our University has shown that project work can be implemented using the World Wide Web for many aspects of the project activities. The possibilities

  20. Telematic tools to support group projects in higher education

    NARCIS (Netherlands)

    van der Veen, Johan (CTIT); Collis, Betty; Muldner, T.; Reeves, T.C.

    1997-01-01

    We describe ongoing evaluations and new research on the use of telematic tools to support project work in higher education. Practical experience at our University has shown that project work can be implemented using the World Wide Web for many aspects of the project activities. The possibilities

  1. A Reflection on the Work of an Educational Psychologist in Providing Supervision for a Team of Community Based Support Workers, Supporting Families with Vulnerable Adolescents at Risk of Exclusion from School

    Science.gov (United States)

    Maxwell, Tim

    2013-01-01

    The evolving role of the educational psychologist (EP) is discussed with an emphasis on the supervision provided for a team of support workers for vulnerable adolescents, working within a Local Service Team. This development is considered in the context of the Every Child Matters (DfES, 2004) agenda and the Farrell, Woods, Lewis, Rooney, Squire…

  2. Annunciation - building product team capabilities to support utility operational improvement

    International Nuclear Information System (INIS)

    Doucet, R.; Brown, R.; Trask, D.; Leger, R.; Mitchel, G.; Judd, R.; Davey, E.

    2003-01-01

    The purpose of this paper is to describe an AECL initiative to enhance the capabilities to assist utilities with undertaking annunciation improvement. This initiative was undertaken to complement a recent annunciation product upgrade, and in anticipation of developing commercial opportunities to assist Canadian and foreign utilities with control room annunciation improvement. Utilities are relying more and more on external engineering product and service providers to meet their plant support needs as they reduce in-house staffing to lower ongoing support costs. This evolving commercial environment places new demands on product and service providers, and provides new opportunities for increasing the proportion of product and service provider participation in plant improvement projects. This paper outlines recent AECL experience in the annunciation product area. The paper discusses the rationale for product support capability improvement, discusses the approaches undertaken, describes lessons learned, and outlines a proposed utility support model for assisting with future annunciation improvements. (author)

  3. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  4. Some Results from Rehabilitation Team Training.

    Science.gov (United States)

    Settles, Robert B.; Crisler, Jack R.

    Provision of training for an interdisciplinary rehabilitation team in a center serving mental patients was investigated. An autonomous service delivery rehabilitation team was formed and provided training in cooperative function. Findings indicate that the experimental team became a particularly cohesive functional unit, and that their support of…

  5. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  6. Rural interdisciplinary mental health team building via satellite: a demonstration project.

    Science.gov (United States)

    Cornish, Peter A; Church, Elizabeth; Callanan, Terrence; Bethune, Cheri; Robbins, Carl; Miller, Robert

    2003-01-01

    This paper reports on the results of a demonstration project that examined the role of telehealth/telemedicine (hereafter referred to as telehealth) in providing interdisciplinary mental health training and support to health professionals in a rural region of Atlantic Canada. Special emphasis was placed on addressing the question of how training might affect interdisciplinary collaboration among the rural health professionals. Five urban mental health professionals from three disciplines provided training and support via video-satellite and internet, print and video resources to 34 rural health and community professionals. In order to assess the rural community's needs and the impact of the interventions, questionnaires were administered and on-site interviews were conducted before and after the project. Throughout the project, field notes were recorded and satisfaction ratings were obtained. Satisfaction with the video-satellite presentations was high and stable, with the exception of one session when signal quality was very poor. Rural participants were most satisfied with opportunities for interaction and least satisfied with the variable quality of the video transmission signal. High staff turnover among rural professionals resulted in insufficient power to permit statistical analysis. Positive reports of the project impact included expanded knowledge and heightened sensitivity to mental health issues, increased cross-disciplinary connections, and greater cohesion among professionals. The results suggest that, with some refinements, telehealth technology can be used to facilitate mental health training and promote interdisciplinary collaboration among professionals in a rural setting.

  7. Supporting and improving community health services-a prospective evaluation of ECHO technology in community palliative care nursing teams.

    Science.gov (United States)

    White, Clare; McIlfatrick, Sonja; Dunwoody, Lynn; Watson, Max

    2015-12-01

    Project ECHO (Extension for Community Healthcare Outcomes) uses teleconferencing technology to support and train healthcare providers (HCPs) remotely, and has improved care across the USA. A 6-month pilot was trialled in a community palliative care nursing setting to determine if ECHO would be effective in the UK in providing education and support to community hospice nurses (CHN). The pilot involved weekly 2 hour sessions of teaching and case-based discussions facilitated by hospice staff linking with nine teams of CHN using video conferencing technology. A mixed-methods prospective longitudinal cohort study was used to evaluate the pilot. Each CHN provided demographic data, and completed a written knowledge assessment and a self-efficacy tool before and after the pilot. Two focus groups were also performed after the pilot. 28 CHNs completed the evaluation. Mean knowledge score improved significantly from 71.3% to 82.7% (p=0.0005) as did overall self-efficacy scores following the ECHO pilot. Pre-ECHO (p=0.036) and Retro-Pretest ECHO (p=0.0005) self-efficacy were significantly lower than post-ECHO. There was no significant difference between Pretest and Retro-Pretest ECHO self-efficacy (p=0.063). 96% recorded gains in learning, and 90% felt that ECHO had improved the care they provided for patients. 83% would recommend ECHO to other HCPs. 70% stated the technology used in ECHO had given them access to education that would have been hard to access due to geography. This study supports the use of Project ECHO for CHNs in the UK by demonstrating how a 6-month pilot improved knowledge and self-efficacy. As a low-cost high-impact model, ECHO provides an affordable solution to addressing growing need. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  8. Forget (a while) the World Cup... support the CERN football team

    CERN Multimedia

    2006-01-01

    Teammates celebrate their victory and bring home the trophy. During this year's World Cup, it seems unlikely that there could exist a team that everyone would unanimously cheer for...at least, at CERN. Yet, the CERN FC team made up of various nationalities (Austrian, Belgian, English, French, Italian, Norwegian, Portuguese, Spanish, Swedish, Swiss,) won this year's Association Genevoise de Football Corporatif (AGFC) Championship, a championship for companies in Geneva. In 2002 the CERN Football team was re-formed and entered in the AGFC after a number of years in the wilderness. The team quickly progressed from Division D as a result of three successive promotions and competed in League A (the top flight) for the first time in 2005. CERN FC history was made two weeks ago. Having qualified for the end-of-season playoffs by finishing second in its regular season group, on Thursday 15 June the team qualified for the AGFC Division A Championship final by beating the Geneva Police 2-0 in the semi-final at Stade M...

  9. FJET Database Project: Extract, Transform, and Load

    Science.gov (United States)

    Samms, Kevin O.

    2015-01-01

    The Data Mining & Knowledge Management team at Kennedy Space Center is providing data management services to the Frangible Joint Empirical Test (FJET) project at Langley Research Center (LARC). FJET is a project under the NASA Engineering and Safety Center (NESC). The purpose of FJET is to conduct an assessment of mild detonating fuse (MDF) frangible joints (FJs) for human spacecraft separation tasks in support of the NASA Commercial Crew Program. The Data Mining & Knowledge Management team has been tasked with creating and managing a database for the efficient storage and retrieval of FJET test data. This paper details the Extract, Transform, and Load (ETL) process as it is related to gathering FJET test data into a Microsoft SQL relational database, and making that data available to the data users. Lessons learned, procedures implemented, and programming code samples are discussed to help detail the learning experienced as the Data Mining & Knowledge Management team adapted to changing requirements and new technology while maintaining flexibility of design in various aspects of the data management project.

  10. Collocation Impact on Team Effectiveness

    Directory of Open Access Journals (Sweden)

    M Eccles

    2010-11-01

    Full Text Available The collocation of software development teams is common, specially in agile software development environments. However little is known about the impact of collocation on the team’s effectiveness. This paper explores the impact of collocating agile software development teams on a number of team effectiveness factors. The study focused on South African software development teams and gathered data through the use of questionnaires and interviews. The key finding was that collocation has a positive impact on a number of team effectiveness factors which can be categorised under team composition, team support, team management and structure and team communication. Some of the negative impact collocation had on team effectiveness relate to the fact that team members perceived that less emphasis was placed on roles, that morale of the group was influenced by individuals, and that collocation was invasive, reduced level of privacy and increased frequency of interruptions. Overall through it is proposed that companies should consider collocating their agile software development teams, as collocation might leverage overall team effectiveness.

  11. Managing Communication among Geographically Distributed Teams: A Brazilian Case

    Science.gov (United States)

    Almeida, Ana Carina M.; de Farias Junior, Ivaldir H.; de S. Carneiro, Pedro Jorge

    The growing demand for qualified professionals is making software companies opt for distributed software development (DSD). At the project conception, communication and synchronization of information are critical factors for success. However problems such as time-zone difference between teams, culture, language and different development processes among sites could difficult the communication among teams. In this way, the main goal of this paper is to describe the solution adopted by a Brazilian team to improve communication in a multisite project environment. The purposed solution was based on the best practices described in the literature, and the communication plan was created based on the infrastructure needed by the project. The outcome of this work is to minimize the impact of communication issues in multisite projects, increasing productivity, good understanding and avoiding rework on code and document writing.

  12. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  13. Promoting teamwork and surgical optimization: combining TeamSTEPPS with a specialty team protocol.

    Science.gov (United States)

    Tibbs, Sheila Marie; Moss, Jacqueline

    2014-11-01

    This quality improvement project was a 300-day descriptive preintervention and postintervention comparison consisting of a convenience sample of 18 gynecology surgical team members. We administered the Team Strategies & Tools to Enhance Performance and Patient Safety (TeamSTEPPS®) Teamwork Perception Questionnaire to measure the perception of teamwork. In addition, we collected data regarding rates of compliance (ie, huddle, time out) and measurable surgical procedure times. Results showed a statistically significant increase in the number of team members present for each procedure, 2.34 μ before compared with 2.61 μ after (P = .038), and in the final time-out (FTO) compliance as a result of a clarification of the definition of FTO, 1.05 μ before compared with 1.18 μ after (P = .004). Additionally, there was improvement in staff members' perception of teamwork. The implementation of team training, protocols, and algorithms can enhance surgical optimization, communication, and work relationships. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  14. What constitutes meaningful engagement for patients and families as partners on research teams?

    Science.gov (United States)

    Black, Agnes; Strain, Kimberly; Wallsworth, Christine; Charlton, Sara-Grey; Chang, Wilma; McNamee, Kate; Hamilton, Clayon

    2018-01-01

    Objective There is growing emphasis on health care organizations to ensure that lay people are meaningfully engaged as partners on research teams. Our aim was to explore the perspectives of patients, family members and informal caregivers who have been involved on health care research teams in Canada and elicit their recommendations for meaningful engagement. Methods We conducted a qualitative study guided by thematic analysis of transcripts of focus groups and interviews of 19 experienced patient research partners in Canada. Results We identified four main themes: research environment, expectations, support and value, which highlight participants' combined perspectives on important factors to ensure their engagement in research is meaningful. Conclusions Our findings add to the evolving evidence base on the perspectives of lay people involved in health care research and their recommendations for research leaders on meaningful engagement. Our study suggests that research leaders should provide a welcoming research environment, outline appropriate expectations for patient research partners on research teams, support patient research partners' engagement in projects and recognize the value patient research partners bring to health research.

  15. Facilitating Transition to Team Based Design Education

    DEFF Research Database (Denmark)

    Tollestrup, Christian

    2014-01-01

    profession, but at the same time it becomes very difficult to identify where and how the design is created since form-giving now becomes a group effort. So as a way to ease the transition from highly framed and facilitated high school learning context to university self-driven learning context a small...... given to two set of students; one set that received the survival kit in 2011 and 2012 and one set that did not. The questionnaire inquires the students’ attitude towards 4 aspects: 1.General level of preparedness for team and problem based project work 2.Level of information of expectations from...... supervisors and programme 3.Reflection of the role in a team, problem based project work 4.The level of information of special expectations from the Industrial Design program towards team and problem based project work. Results indicates that Class receiving the “Survival Kit” improved in the calibration...

  16. We will be champions: Leaders' confidence in 'us' inspires team members' team confidence and performance.

    Science.gov (United States)

    Fransen, K; Steffens, N K; Haslam, S A; Vanbeselaere, N; Vande Broek, G; Boen, F

    2016-12-01

    The present research examines the impact of leaders' confidence in their team on the team confidence and performance of their teammates. In an experiment involving newly assembled soccer teams, we manipulated the team confidence expressed by the team leader (high vs neutral vs low) and assessed team members' responses and performance as they unfolded during a competition (i.e., in a first baseline session and a second test session). Our findings pointed to team confidence contagion such that when the leader had expressed high (rather than neutral or low) team confidence, team members perceived their team to be more efficacious and were more confident in the team's ability to win. Moreover, leaders' team confidence affected individual and team performance such that teams led by a highly confident leader performed better than those led by a less confident leader. Finally, the results supported a hypothesized mediational model in showing that the effect of leaders' confidence on team members' team confidence and performance was mediated by the leader's perceived identity leadership and members' team identification. In conclusion, the findings of this experiment suggest that leaders' team confidence can enhance members' team confidence and performance by fostering members' identification with the team. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  17. Digital coach supporting the creation of a project plan (A.K.A. pid or plan of approach)

    NARCIS (Netherlands)

    Steven Nijhuis

    2012-01-01

    full text via link. A lot of curricula in higher education depend on Project Based Learning. This provides students with a setting which (slightly) resembles their future way of working: in teams, in projects. The rojects have increasingly a real problem-owner, so students are highly motivated to

  18. Cyrogenic Life Support Technology Development Project

    Science.gov (United States)

    Bush, David R.

    2015-01-01

    KSC has used cryogenic life support (liquid air based) technology successfully for many years to support spaceflight operations. This technology has many benefits unique to cryogenics when compared to traditional compressed gas systems: passive cooling, lighter, longer duration, and lower operating pressure. However, there are also several limiting factors that have prevented the technology from being commercialized. The National Institute of Occupational Safety and Health, Office of Mine Safety and Health Research (NIOSH-OMSHR) has partnered with NASA to develop a complete liquid air based life support solution for emergency mine escape and rescue. The project will develop and demonstrate various prototype devices and incorporate new technological innovations that have to date prevented commercialization.

  19. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [Department of Energy, Office of River Protection, Richland, Washington (United States); Kacich, Richard M. [Bechtel National, Inc., Richland, WA (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Richland, WA (United States)

    2012-12-20

    wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

  20. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2012-01-01

    wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration snd Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESHandQA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan

  1. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2013-01-01

    wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant R Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

  2. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [U.S. Department of Energy, Office of River Protection, Post Office Box 550, Richland, Washington 99352 (United States); Kacich, Richard M. [Bechtel National, Inc., 2435 Stevens Center Place, Richland, Washington 99354 (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Post Office Box 850, Richland, Washington 99352 (United States)

    2013-07-01

    for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

  3. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  4. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  5. A Team Formation and Project-based Learning Support Service for Social Learning Networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Van de Vrie, Evert; Obreza, Matija; Sloep, Peter

    2014-01-01

    The Internet affords new approaches to learning. Geographically dispersed self-directed learners can learn in computer-supported communities, forming social learning networks. However, self-directed learners can suffer from a lack of continuous motivation. And surprisingly, social learning networks

  6. Engineering, Analysis and Technology FY 1995 Site Support Program Plan

    International Nuclear Information System (INIS)

    Suyama, R.M.

    1994-09-01

    The vision of the Engineering, Analysis and Technology organization is to be recognized as the cost-effective supplier of specialized, integrated, multi-disciplined engineering teams to support Hanford missions. The mission of the Engineering, Analysis and Technology organization is to provide centralized engineering services. These services are focused on supplying technical design, analytical engineering and related support services that support Hanford's environmental restoration mission. These services include engineering analysis, design and development of systems and engineered equipment, supplying multi-disciplined engineering teams to all Hanford programs and project organizations, engineering document release, and site-wide leadership in the development and implementation of engineering standards, engineering practices, and configuration management processes

  7. How do top managers support strategic information system projects and why do they sometimes withhold this support?

    NARCIS (Netherlands)

    Boonstra, A.

    Top management support is an important determinant of information system project success. This is especially the case in complex and large-scale IS projects. Surprisingly, however, there is only limited reliable knowledge about the types of behavior that underlie top management support. Further,

  8. Intercultural Competence – Key Competence of Multicultural Teams

    Directory of Open Access Journals (Sweden)

    Diana Bebenova - Nikolova

    2014-08-01

    Full Text Available The article deals with intercultural competence of multicultural teams elaborating European projects. Firstly, it discusses basic theoretical aspects of the related concepts: culture and intercultural competence, then presents its impact on multicultural team effectiveness and models for improving it. The article finds ground on studies of intercultural competence as a set of strategic, personal, social and professional competences. The paper uses the project cycle management theory and proves that in multi-ethnic surroundings, the project membersř communication skills might not be sufficient to generate mutual understanding. Provisionally, the study performed a standardized Internet survey on self-assessment of intercultural competence among 50 experts on European projects. Another applied approach is field observation (attendance and note-taking of the 5- day training "To become diplomats between cultures", based on Bennettřs theoretical model for "Development of Intercultural Sensitivity". A training model for improving intercultural competence of multicultural team members. Possible approach for improvement of project management of crossborder or trans-border funding programs. Building intercultural competence in European project management is important, timely and necessity-driven, especially under the framework of the Danube Region Strategy.

  9. Effects of Individual Success on Globally Distributed Team Performance

    OpenAIRE

    Yılmaz, Onur

    2013-01-01

    Necessity of different competencies with high level of knowledge makes it inevitable that software development is a team work. With the today's technology, teams can communicate both synchronously and asynchronously using different online collaboration tools throughout the world. Researches indicate that there are many factors that affect the team success and in this paper, effect of individual success on globally distributed team performance will be analyzed. Student team projects undertaken...

  10. Red Teaming of Advanced Information Assurance Concepts

    International Nuclear Information System (INIS)

    DUGGAN, RUTH A.; WOOD, BRADLEY

    1999-01-01

    Red Teaming is an advanced form of assessment that can be used to identify weaknesses in a variety of cyber systems. it is especially beneficial when the target system is still in development when designers can readily affect improvements. This paper discusses the red team analysis process and the author's experiences applying this process to five selected Information Technology Office (ITO) projects. Some detail of the overall methodology, summary results from the five projects, and lessons learned are contained within this paper

  11. Maui Smart Grid Demonstration Project Managing Distribution System Resources for Improved Service Quality and Reliability, Transmission Congestion Relief, and Grid Support Functions

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-30

    The Maui Smart Grid Project (MSGP) is under the leadership of the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii at Manoa. The project team includes Maui Electric Company, Ltd. (MECO), Hawaiian Electric Company, Inc. (HECO), Sentech (a division of SRA International, Inc.), Silver Spring Networks (SSN), Alstom Grid, Maui Economic Development Board (MEDB), University of Hawaii-Maui College (UHMC), and the County of Maui. MSGP was supported by the U.S. Department of Energy (DOE) under Cooperative Agreement Number DE-FC26-08NT02871, with approximately 50% co-funding supplied by MECO. The project was designed to develop and demonstrate an integrated monitoring, communications, database, applications, and decision support solution that aggregates renewable energy (RE), other distributed generation (DG), energy storage, and demand response technologies in a distribution system to achieve both distribution and transmission-level benefits. The application of these new technologies and procedures will increase MECO’s visibility into system conditions, with the expected benefits of enabling more renewable energy resources to be integrated into the grid, improving service quality, increasing overall reliability of the power system, and ultimately reducing costs to both MECO and its customers.

  12. Renewable Energy Project Development Assistance (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-07-01

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  13. An improvement project within urological care.

    Science.gov (United States)

    Khatami, Annelie; Rosengren, Kristina

    2015-01-01

    The purpose of this paper is to describe staff experiences in an on-going improvement project regarding patients with ureteral stones. A qualitative descriptive study based on eight group interviews and 48 narratives, was performed. Data were analysed using qualitative content analysis. Trustworthiness was ensured by using a well-documented improvement process method during six months. The results formed three categories: an absent comprehensive view; complexity; and vulnerability within the organisation. A holistic perspective regarding urological care at the micro-, meso- and macro-levels is needed to improve planning and caring processes. This study includes one team (six members, different health professionals) within the same urology department. Results show that staff need information, such as guidelines and support throughout the improvement work to deliver high-quality care. Moreover, there is a need for evidence-based guidelines at national level to support improvement work. Healthcare staff need to pay attention to all team member needs to improve urological care. Organisational and managerial aspect are needed to support clear and common goals regarding healthcare improvement work. Urological improvement projects, generally, are lacking, which is why this study is important to improve nephrolithiasis patient care.

  14. The Undergraduate ALFALFA Team: Outcomes for Over 250 Undergraduate Participants

    Science.gov (United States)

    Troischt, Parker; Koopmann, Rebecca A.; Haynes, Martha P.; ALFALFA Team

    2016-01-01

    The NSF-sponsored Undergraduate ALFALFA (Arecibo Legacy Fast ALFA) Team (UAT) is a consortium of 19 institutions founded to promote undergraduate research and faculty development within the extragalactic ALFALFA HI blind survey project and follow-up programs. In this talk we present outcomes for the more than 250 undergraduate students who have who have participated in the program during the 8 years of funding. 40% of these students have been women and members of underrepresented groups. To date 148 undergraduate students have attended annual workshops at Arecibo Observatory, interacting with faculty, graduate students, their peers, and Arecibo staff in lectures, group activities, tours, and observing runs. Team faculty have supervised 159 summer research projects and 120 academic year (e.g., senior thesis) projects. 68 students have traveled to Arecibo Observatory for observing runs and 55 have presented their results at national meetings such as the AAS. Through participation in the UAT, students are made aware of career paths they may not have previously considered. More than 90% of alumni are attending graduate school and/or pursuing a career in STEM. 42% of those pursuing graduate degrees in Physics or Astronomy are women. This work has been supported by NSF grants AST-0724918/0902211, AST-075267/0903394, AST-0725380, and AST-1211005

  15. Teaming. The Key to World Class Manufacturing.

    Science.gov (United States)

    Wright, John R.

    1999-01-01

    Lean manufacturing, a streamlined system of flow and job shop techniques, relies on self-directed work teams. Technology educators can prepare students for work in this environment by using problem-solving teams in the classroom to work on design briefs and other group projects. (SK)

  16. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  17. Payment Mechanisms for Integrated Teams in Construction

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available The overwhelming consensus for process andteam integration has emerged as an enabler tomanage construction projects. Theperformance of integrated teams is highlyaffected by the adopted payment mechanism.However, the payment mechanisms availablefor a project may need the team tocompromise in order to agree on a fairmechanism for as many members as possible.This paper introduces a methodology tosimulate the profiles of alternative paymentmechanisms. The methodology aims to helpproject teams define the most appropriatemechanism for each member. The proposedmethodology is therefore novel and superior toexisting cash flow models where the focus hasbeen limited to main contractors only. Topromote its use as a performance enablingmechanism, the methodology utilizes “theproject process map”, “the stakeholders &supply chain”, “the pricing method” and “thepayment mechanism”. This will act as an aid todesign or “fine-tune” payment mechanisms toindividual projects characteristics consideringpayment for off-site materials andcomponents, which always concerns projectfabricators and supply chain.

  18. Creating Shared Understanding in Product development Teams

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller; Tollestrup, Christian

    , they also have to figure out what their users and stakeholders find important. In other words, the team has to frame their project around real user needs, problems or opportunities – and figure out what people really want, and at the same time come to an agreement about this framing within the team......It is the first meeting in a new promising project. Everyone around the table is enthusiastic about the project and excited to get going. There is a good atmos¬phere and the discussion travels back and forth. Everyone tries to present their point of view, which results in a broad discussion on very...... if they have reached an agreement and everyone nods their approval. Everyone leaves the meeting, confident that they know what to do. A few weeks after, it is time for the second meeting. The team spirit is still high and there is a nice buzz in the meeting room, before the meeting starts. The introduction...

  19. European financial support and succesful road PPP Projects

    Energy Technology Data Exchange (ETDEWEB)

    Garrido Maza, G.

    2016-07-01

    The EU has been promoting the use of PPPs in order to accelerate the development of the Trans-European Transport Network (TEN-T) for ensuring economic, social and territorial cohesion and increasing accessibility throughout the Union. To encourage the use of PPPs, the European Commission has put several financing mechanisms at the disposal of the Member States, including a series of innovative financial instruments developed along with the European Investment Bank. The Bank has in turn played a major role in the promotion and financing of PPPs across the EU. The paper undertakes a review of the main financial instruments developed by the EU that are available to PPPs so as to determinate to what extent the European financial support has been channelled to road projects under that scheme in Spain. On the basis of the results obtained, a multiple regression model has been developed to analyse whether the PPP projects which enjoyed the financial support of the European Union tend to be significantly more successful from an economic point of view. The paper concludes that there is a positive correlation between receiving European financial support and the success of the PPP road projects. (Author)

  20. Experiences of multidisciplinary development team members during user-centered design of telecare products and services: a qualitative study.

    Science.gov (United States)

    Vermeulen, Joan; Verwey, Renée; Hochstenbach, Laura M J; van der Weegen, Sanne; Man, Yan Ping; de Witte, Luc P

    2014-05-19

    User-centered design (UCD) methodologies can help take the needs and requirements of potential end-users into account during the development of innovative telecare products and services. Understanding how members of multidisciplinary development teams experience the UCD process might help to gain insight into factors that members with different backgrounds consider critical during the development of telecare products and services. The primary objective of this study was to explore how members of multidisciplinary development teams experienced the UCD process of telecare products and services. The secondary objective was to identify differences and similarities in the barriers and facilitators they experienced. Twenty-five members of multidisciplinary development teams of four Research and Development (R&D) projects participated in this study. The R&D projects aimed to develop telecare products and services that can support self-management in elderly people or patients with chronic conditions. Seven participants were representatives of end-users (elderly persons or patients with chronic conditions), three were professional end-users (geriatrician and nurses), five were engineers, four were managers (of R&D companies or engineering teams), and six were researchers. All participants were interviewed by a researcher who was not part of their own development team. The following topics were discussed during the interviews: (1) aim of the project, (2) role of the participant, (3) experiences during the development process, (4) points of improvement, and (5) what the project meant to the participant. Experiences of participants related to the following themes: (1) creating a development team, (2) expectations regarding responsibilities and roles, (3) translating user requirements into technical requirements, (4) technical challenges, (5) evaluation of developed products and services, and (6) valorization. Multidisciplinary team members from different backgrounds often

  1. Essential Skills for Project Stakeholders Identification: Sustainability Perspective

    Directory of Open Access Journals (Sweden)

    Md. Mashiur Rahman

    2017-09-01

    Full Text Available In every life cycle of the project there are numerous people or organizations involved either directly or indirectly. While these type of people and organizations involved are called stakeholders and these may include the project team, client or customer, community, environment, suppliers, government. Stakeholders contribute and share their experiences, knowledge, and insights to support the project throughout its life cycle and therefore it is crucial to capture their input. However, before initiation of the project, stakeholders need to be identified. Following the fact that there are strategies and processes for stakeholder identification, it is not clear what skills are needed to employ those strategies for stakeholder identification. These skills are exceedingly important to have because in today's corporate world, the project team must be flexible in every aspect of their job and be able to complement their skills for the success of stakeholder identification. Using literature review, this paper seeks to describe the skills of project leader needed to identify the project team and the external stakeholders. Inductive approach was followed in this study and data was collected qualitatively using secondary sources. There are two essential skills i.e. relationship building skills and communication skills for internal stakeholders and four major skills i.e. communication skills, people skills, intellectual skills and conceptual skills for external stakeholders are identified for the identification of project stakeholders through literature review considering the sustainability issues in the project management.

  2. The big five personality traits and individual satisfaction with the team

    NARCIS (Netherlands)

    Peeters, Miranda A.G.; Rutte, Christel G.; van Tuijl, Harrie F.J.M.; Reymen, Isabelle

    2006-01-01

    Relationships between team composition in terms of team members' Big Five personality traits and individual satisfaction with the team after project completion were researched. Questionnaires were filled out by 310 undergraduate students (N= 68 teams) working on an engineering design assignment.

  3. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-01

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  4. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  5. An examination of organizational and team commitment in a self-directed team environment.

    Science.gov (United States)

    Bishop, James W; Scott, K Dow

    2000-06-01

    A model hypothesizing differential relationships among predictor variables and individual commitment to the organization and work team was tested. Data from 485 members of sewing teams supported the existence of differential relationships between predictors and organizational and team commitment. In particular, intersender conflict and satisfaction with coworkers were more strongly related to team commitment than to organizational commitment. Resource-related conflict and satisfaction with supervision were more strongly related to organizational commitment than to team commitment. Perceived task interdependence was strongly related to both commitment foci. Contrary to prediction, the relationships between perceived task interdependence and the 2 commitment foci were not significantly different. Relationships with antecedent variables help explain how differential levels of commitment to the 2 foci may be formed. Indirect effects of exogenous variables are reported.

  6. Organisation, regulations, preparation and logistics of parenteral nutrition in hospitals and homes; the role of the nutrition support team – Guidelines on Parenteral Nutrition, Chapter 8

    Directory of Open Access Journals (Sweden)

    Kester, L.

    2009-11-01

    Full Text Available PN (parenteral nutrition should be standardised to ensure quality and to reduce complications, and it should be carried out in consultation with a specialised nutrition support team whenever possible. Interdisciplinary nutrition support teams should be established in all hospitals because effectiveness and efficiency in the implementation of PN are increased. The tasks of the team include improvements of quality of care as well as enhancing the benefit to cost ratio. Therapeutic decisions must be taken by attending physicians, who should collaborate with the nutrition support team. “All-in-One” bags are generally preferred for PN in hospitals and may be industrially manufactured, industrially manufactured with the necessity to add micronutrients, or be prepared “on-demand” within or outside the hospital according to a standardised or individual composition and under consideration of sterile and aseptic conditions. A standardised procedure should be established for introduction and advancement of enteral or oral nutrition. Home PN may be indicated if the expected duration of when PN exceeds 4 weeks. Home PN is a well established method for providing long-term PN, which should be indicated by the attending physician and be reviewed by the nutrition support team. The care of home PN patients should be standardised whenever possible. The indication for home PN should be regularly reviewed during the course of PN.

  7. Supporting the development of shared understanding in distributed design teams

    OpenAIRE

    Cash, Philip; Dekoninck, Elies; Ahmed-Kristensen, Saeema

    2017-01-01

    Distributed teams are an increasingly common feature of engineering design work. One key factor in the success of these teams is the development of short- and longer-term shared understanding. A lack of shared understanding has been recognized as a significant challenge, particularly in the context of globally distributed engineering activities. A major antecedent for shared understanding is question asking and feedback. Building on question-asking theory this work uses a quasi-experimental s...

  8. Nice Teams Finish Last The Secret to Unleashing Your Team's Maximum Potential

    CERN Document Server

    Miller, Brian Cole

    2010-01-01

    Don't rock the boat. Don't make waves. Don't offend anyone. There's a palpable feeling that clouds many team meetings and keeps them from being productive: over-politeness. And while the conflict that naturally exists in most organizations hasn't gone away, it manifests itself in passive-aggression, mediocrity, and a molasses-like inability to get anything done. Nice Teams Finish Last provides the antidote to this all-too-common tendency, giving managers, team leaders and members, and facilitators the practical support they need to battle "the nice trap" and start getting results! The book hel

  9. NASA Advanced Exploration Systems: Advancements in Life Support Systems

    Science.gov (United States)

    Shull, Sarah A.; Schneider, Walter F.

    2016-01-01

    The NASA Advanced Exploration Systems (AES) Life Support Systems (LSS) project strives to develop reliable, energy-efficient, and low-mass spacecraft systems to provide environmental control and life support systems (ECLSS) critical to enabling long duration human missions beyond low Earth orbit (LEO). Highly reliable, closed-loop life support systems are among the capabilities required for the longer duration human space exploration missions assessed by NASA’s Habitability Architecture Team.

  10. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  11. Team health, an assessment approach to engage first year students in cross-cultural and cross-discipline teams towards more effective team-working

    Directory of Open Access Journals (Sweden)

    Kathy Egea

    Full Text Available Specialists who work in a globalised environment, need to work in teams, if they are to be continuously effective. The challenge for IT educators is to design and implement inter-cultural teamwork practices into their curriculum. Investigating this challenge, this case study describes Team Health, an assessment approach designed to skill students to be more effective in team working in cross-cultural and cross-discipline teams. The educational context is teamwork practice within a first year introductory web design course. Framed by Saunders\\'s virtual team lifecycle model (relationship building and team processes and Hofstede\\'s cultural dimensions (communication and working cross-culturally, the assessment approach utilises reflective and iterative strategies to support team working. At three points in the semester, students complete a survey on these four concepts, identify team strengths and weaknesses from the results of the surveys and work towards addressing one team weakness. The final assessment activity requires students to reflect on team working for the semester. Key attributes for effective team working are identified from the three surveys and the final reflective summaries. This paper compares course outcomes such as team cohesion and student grades to the previous course offering and shows that with the introduction of Team Health, the more complex student cohorts under this study achieve equally well. It is concluded that the guided reflective practices underpinning Team Health can prepare students for first year approaches to teamwork, and thereby provide starting points for working in future global teams where members are both culturally diverse and from different discipline areas.

  12. Real-Time Support of Pediatric Diabetes Self-Care by a Transport Team

    Science.gov (United States)

    Franklin, Brandi E.; Crisler, S. Crile; Shappley, Rebekah; Armour, Meri M.; McCommon, Dana T.; Ferry, Robert J.

    2014-01-01

    OBJECTIVE The study seeks to improve access for underserved patients via novel integration of Pedi-Flite (a critical care transport team) and to validate whether this safely enhances diabetes care and effectively expands the endocrine workforce. RESEARCH DESIGN AND METHODS The study retrospectively analyzed pager service use in a cohort of established diabetic patients (n = 979) after inception of Pedi-Flite support. Outcomes included incidence and severity of recurrent diabetic ketoacidosis (DKA) and cost savings generated from reduced referrals to the emergency department (ED) and on-call endocrinologist. We generated descriptive statistics to characterize the study population and ED visits for DKA and constructed logistic regression models to examine associations of pager use and likelihood of ED visitation and nonelective inpatient admission from an ED for DKA. RESULTS Pager users comprised 30% of the patient population. They were younger but had more established diabetes than nonusers. While pager users were 2.75 times more likely than nonusers to visit the ED for DKA (P management models supported by allied health personnel. PMID:23959568

  13. Real-time support of pediatric diabetes self-care by a transport team.

    Science.gov (United States)

    Franklin, Brandi E; Crisler, S Crile; Shappley, Rebekah; Armour, Meri M; McCommon, Dana T; Ferry, Robert J

    2014-01-01

    OBJECTIVE The study seeks to improve access for underserved patients via novel integration of Pedi-Flite (a critical care transport team) and to validate whether this safely enhances diabetes care and effectively expands the endocrine workforce. RESEARCH DESIGN AND METHODS The study retrospectively analyzed pager service use in a cohort of established diabetic patients (n = 979) after inception of Pedi-Flite support. Outcomes included incidence and severity of recurrent diabetic ketoacidosis (DKA) and cost savings generated from reduced referrals to the emergency department (ED) and on-call endocrinologist. We generated descriptive statistics to characterize the study population and ED visits for DKA and constructed logistic regression models to examine associations of pager use and likelihood of ED visitation and nonelective inpatient admission from an ED for DKA. RESULTS Pager users comprised 30% of the patient population. They were younger but had more established diabetes than nonusers. While pager users were 2.75 times more likely than nonusers to visit the ED for DKA (P management models supported by allied health personnel.

  14. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  15. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  16. Parental experiences with a paediatric palliative care team: A qualitative study.

    Science.gov (United States)

    Verberne, Lisa M; Schouten-van Meeteren, Antoinette Yn; Bosman, Diederik K; Colenbrander, Derk A; Jagt, Charissa T; Grootenhuis, Martha A; van Delden, Johannes Jm; Kars, Marijke C

    2017-12-01

    Parents of children with a life-limiting disease have to rely on themselves at home while adequate paediatric palliative care is lacking. In several countries, paediatric palliative care teams are introduced to ensure continuity and quality of care and to support the child and the family. Yet, little is known about how parents experience such multidisciplinary teams. To obtain insight into the support provided by a new paediatric palliative care team from the parents' perspective. An interpretative qualitative interview study using thematic analysis was performed. A total of 47 single or repeated interviews were undertaken with 42 parents of 24 children supported by a multidisciplinary paediatric palliative care team located at a university children's hospital. The children suffered from malignant or non-malignant diseases. In advance, parents had limited expectations of the paediatric palliative care team. Some had difficulty accepting the need for palliative care for their child. Once parents experienced what the team achieved for their child and family, they valued the team's involvement. Valuable elements were as follows: (1) process-related aspects such as continuity, coordination of care, and providing one reliable point of contact; (2) practical support; and (3) the team members' sensitive and reliable attitude. As a point of improvement, parents suggested more concrete clarification upfront of the content of the team's support. Parents feel supported by the paediatric palliative care team. The three elements valued by parents probably form the structure that underlies quality of paediatric palliative care. New teams should cover these three valuable elements.

  17. It Is Not Only Mentoring: The Combined Influences of Individual-Level and Team-Level Support on Job Performance

    Science.gov (United States)

    van Emmerik, I. J. Hetty

    2008-01-01

    Purpose: The paper aims to follow social exchange theory and group social capital theory, to predict positive relationships between (informal) mentoring and various support resources for two types of performance (i.e. perceptions of individual and team performance). Design/methodology/approach: The associations of individual-level mentoring and…

  18. Factors associated with continuance commitment to FAA matrix teams.

    Science.gov (United States)

    1993-11-01

    Several organizations within the FAA employ matrix teams to achieve cross-functional coordination. Matrix team members typically represent different organizational functions required for project accomplishment (e.g., research and development, enginee...

  19. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  20. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  1. Team Meetings within Clinical Domains - Exploring the Use of Routines and Technical Support for Communication

    Science.gov (United States)

    Groth, Kristina; Lantz, Ann; Sallnäs, Eva-Lotta; Frykholm, Oscar; Green, Anders

    Today, it is common that a team of clinicians, from different disciplines, instead of one single doctor, care for a patient. This is especially true when it concerns more complicated diseases in highly specialised health care. Going from one doctor to a team of doctors raises new dimensions/problems/issues when deciding about the diagnosis and how to treat the patient. Instead of one person deciding, based on the information given from others, a group of people need to agree on a decision. How do the participants during such decision meetings argue for their experience and skill? What kind of technologies are available and how do they support the communication in the meeting? Måseide (2006), for example, focuses on how different forms of evidence influence and regulate the judgements and decisions of medical practitioners during such meetings. Groth et al. (2008), for example, focuses on the technology used during such meetings, with a focus on audio, video, and images.

  2. Do Different Training Conditions Facilitate Team Implementation?

    DEFF Research Database (Denmark)

    Nielsen, Karina; Randall, Raymond; Christensen, Karl B.

    2017-01-01

    A mixed methods approach was applied to examine the effects of a naturally occurring teamwork intervention supported with training. The first objective was to integrate qualitative process evaluation and quantitative effect evaluation to examine how and why the training influence intervention...... outcomes. The intervention (N = 328) was supplemented with four training conditions (no training, team member training, team leader training, and a combination of training types). The second objective was to examine whether different training conditions support team member training in isolation......, but not in combination, led to positive outcomes. The integrated analysis of qualitative and quantitative data indicated that a number of contextual factors interacted with training experiences and outcomes to influence the success of team intervention....

  3. Organizational leadership for building effective health care teams.

    Science.gov (United States)

    Taplin, Stephen H; Foster, Mary K; Shortell, Stephen M

    2013-01-01

    The movement toward accountable care organizations and patient-centered medical homes will increase with implementation of the Affordable Care Act (ACA). The ACA will therefore give further impetus to the growing importance of teams in health care. Teams typically involve 2 or more people embedded in a larger social system who differentiate their roles, share common goals, interact with each other, and perform tasks affecting others. Multiple team types fit within this definition, and they all need support from leadership to succeed. Teams have been invoked as a necessary tool to address the needs of patients with multiple chronic conditions and to address medical workforce shortages. Invoking teams, however, is much easier than making them function effectively, so we need to consider the implications of the growing emphasis on teams. Although the ACA will spur team development, organizational leadership must use what we know now to train, support, and incentivize team function. Meanwhile, we must also advance research regarding teams in health care to give those leaders more evidence to guide their work.

  4. A multidisciplinary approach to team nursing within a low secure service: the team leader role.

    Science.gov (United States)

    Nagi, Claire; Davies, Jason; Williams, Marie; Roberts, Catherine; Lewis, Roger

    2012-01-01

    This article critically examines the clinical utility of redesigning a nursing practice model within the Intensive Support and Intervention Service, a new low secure mental health facility in the United Kingdom. Specifically, the "team nursing" approach to care delivery has been adapted to consist of multidisciplinary team leaders as opposed to nursing team leaders. The authors describe the role, properties, and functions of the multidisciplinary team leader approach. The authors provide examples of the benefits and challenges posed to date and the ways in which potential barriers have been overcome. Nursing care leadership can be provided by multidisciplinary staff. An adapted model of team nursing can be implemented in a low secure setting. © 2011 Wiley Periodicals, Inc.

  5. Research project on “A Study in Urban Air Pollution Improvement in Asia”

    OpenAIRE

    2017-01-01

    This final report of the joint research project “A study in urban air pollution improvement in Asia” is submitted by the Asian Institute of Technology (AIT) on behalf of the project team following the contract between AIT and the Japan International Cooperation Agency (JICA) for the project period of March 2015 - December 2017. Technical support is provided by the Asia Center for Air Pollution Research (ACAP) Japan and the operational support is provided by the Pollution Control Department (P...

  6. Focused and Corrective Feedback Versus Structured and Supported Debriefing in a Simulation-Based Cardiac Arrest Team Training: A Pilot Randomized Controlled Study.

    Science.gov (United States)

    Kim, Ji-Hoon; Kim, Young-Min; Park, Seong Heui; Ju, Eun A; Choi, Se Min; Hong, Tai Yong

    2017-06-01

    The aim of the study was to compare the educational impact of two postsimulation debriefing methods-focused and corrective feedback (FCF) versus Structured and Supported Debriefing (SSD)-on team dynamics in simulation-based cardiac arrest team training. This was a pilot randomized controlled study conducted at a simulation center. Fourth-year medical students were randomly assigned to the FCF or SSD group, with each team composed of six students and a confederate. Each team participated in two simulations and the assigned debriefing (FCF or SSD) sessions and then underwent a test simulation. Two trained raters blindly assessed all of the recorded simulations using checklists. The primary outcome was the improvement in team dynamics scores between baseline and test simulation. The secondary outcomes were improvements before and after training in team clinical performance scores, self-assessed comprehension of and confidence in cardiac arrest management and team dynamics, as well as evaluations of the postsimulation debriefing intervention. In total, 95 students participated [FCF (8 teams, n = 47) and SSD (8 teams, n = 48)]. The SSD team dynamics score during the test simulation was higher than at baseline [baseline: 74.5 (65.9-80.9), test: 85.0 (71.9-87.6), P = 0.035]. However, there were no differences in the improvement in the team dynamics or team clinical performance scores between the two groups (P = 0.328, respectively). There was no significant difference in improvement in team dynamics scores during the test simulation compared with baseline between the SSD and FCF groups in a simulation-based cardiac arrest team training in fourth-year Korean medical students.

  7. Managing Global Virtual Teams across Classrooms, Students and Faculty

    Science.gov (United States)

    Shea, Timothy P.; Sherer, Pamela D.; Quilling, Rosemary D.; Blewett, Craig N.

    2011-01-01

    Virtual teams are becoming commonplace in business today so our business school students should have experience in effectively working in virtual teams. Based on a month-long virtual team project conducted by the authors between classes in South Africa and the United States, this paper discusses the opportunities and challenges of using global…

  8. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  9. Primary care team working in Ireland: a qualitative exploration of team members' experiences in a new primary care service.

    Science.gov (United States)

    Kennedy, Norelee; Armstrong, Claire; Woodward, Oonagh; Cullen, Walter

    2015-07-01

    Team working is an integral aspect of primary care, but barriers to effective team working can limit the effectiveness of a primary care team (PCT). The establishment of new PCTs in Ireland provides an excellent opportunity to explore team working in action. The aim of this qualitative study was to explore the experiences of team members working in a PCT. Team members (n = 19) from two PCTs were interviewed from May to June 2010 using a semi-structured interview guide. All interviews were audio-recorded and transcribed. Data were analysed using NVivo (version 8). Thematic analysis was used to explore the data. We identified five main themes that described the experiences of the team members. The themes were support for primary care, managing change, communication, evolution of roles and benefits of team working. Team members were generally supportive of primary care and had experienced benefits to their practice and to the care of their patients from participation in the team. Regular team meetings enabled communication and discussion of complex cases. Despite the significant scope for role conflict due to the varied employment arrangements of the team members, neither role nor interpersonal conflict was evident in the teams studied. In addition, despite the unusual team structure in Irish PCTs - where there is no formally appointed team leader or manager - general issues around team working and its benefits and challenges were very similar to those found in other international studies. This suggests, in contrast to some studies, that some aspects of the leadership role may not be as important in successful PCT functioning as previously thought. Nonetheless, team leadership was identified as an important issue in the further development of the teams. © 2014 John Wiley & Sons Ltd.

  10. The role of social capital on trust development and dynamics: Implications for cooperation, monitoring and team performance

    NARCIS (Netherlands)

    Costa, A.C.; Bijlsma-Frankema, K.M.; de Jong, B.A.

    2009-01-01

    This study examined the development and dynamics of trust in project teams and explored the relation with cooperation, monitoring and team performance. Two types of teams were distinguished at the start of the projects: low prior social-capital teams (teams composed of members that have no previous

  11. Patients as team members: opportunities, challenges and paradoxes of including patients in multi-professional healthcare teams.

    Science.gov (United States)

    Martin, Graham P; Finn, Rachael

    2011-11-01

    Current healthcare policy emphasises the need for more collaborative, team-based approaches to providing care, and for a greater voice for service users in the management and delivery of care. Increasingly, policy encourages 'partnerships' between users and professionals so that users, too, effectively become team members. In examining this phenomenon, this paper draws on insights from the organisational-sociological literature on team work, which highlights the challenges of bringing together diverse professional groups, but which has not, to date, been applied in contexts where users, too, are included in teams. Using data from a qualitative study of five pilot cancer-genetics projects, in which service users were included in teams responsible for managing and developing new services, it highlights the difficulties involved in making teams of such heterogeneous members-and the paradoxes that arise when this task is achieved. It reveals how the tension between integration and specialisation of team members, highlighted in the literature on teams in general, is especially acute for service users, the distinctiveness of whose contribution is more fragile, and open to blurring. © 2011 The Authors. Sociology of Health & Illness © 2011 Foundation for the Sociology of Health & Illness/Blackwell Publishing Ltd.

  12. Rethink space: (Re)designing a workspace using human-centered design to support flexibility, collaboration, and engagement among clinical and translational research support services.

    Science.gov (United States)

    Doshi, Aalap; Clay, Christina

    2017-06-01

    Space matters. We read space like we read people's faces. Space is an instrument of collaboration and innovation. At the University of Michigan's Institute for Clinical and Health Research (MICHR), a team was created to creatively and economically enhance our operating space into a flexible workspace that supports privacy, innovation, creativity, and most important, a culture of collaboration. The team used a human-centered design process to creatively engage the staff at large into analyzing our existing space, identifying latent needs, proposing solutions, generating feedback, and economically building the rethought process. The redesigned workspace embraces the differences among MICHR's teams while encouraging collaboration and teamwork and keeping costs at a minimum. It has resulted in a flexible space that includes co-located teams, spaces dedicated to different work goals, an open area for collaboration, quiet zones for focused work, and better wayfinding. Through our Rethink Space project, we hope to have demonstrated that, by initiating the project internally and by engaging the users of the space themselves in an empathetic, visual, and human-centered way, a space redesign can be undertaken economically while also leading to improved levels of employee and team satisfaction.

  13. A socio-psychological perspective on team ambidexterity: The contingency role of supportive leadership behaviors

    NARCIS (Netherlands)

    Jansen, J.J.P.; Kostopoulos, K.C.; Mihalache, R.O.; Papalexandris, A

    2016-01-01

    In addressing the notion of team ambidexterity, we propose that socio-psychological factors (i.e., team cohesion and team efficacy) may help team members to resolve paradoxical challenges and to combine exploratory and exploitative learning efforts. In addition, we theorize that senior executives

  14. The European Union's four-man team of experts attending a demonstration of the DataGrid Project at CERN in early February.

    CERN Multimedia

    2003-01-01

    The DataGrid Project is reviewed by a team of European experts on a yearly basis. At the beginning of February it passed the second of these reviews with flying colours, the four experts issuing enthusiastic statements on the latest progress made, which was quite considerable in 2002.

  15. Data management for interdisciplinary field experiments: OTTER project support

    Science.gov (United States)

    Angelici, Gary; Popovici, Lidia; Skiles, J. W.

    1993-01-01

    The ability of investigators of an interdisciplinary science project to properly manage the data that are collected during the experiment is critical to the effective conduct of science. When the project becomes large, possibly including several scenes of large-format remotely sensed imagery shared by many investigators requiring several services, the data management effort can involve extensive staff and computerized data inventories. The OTTER (Oregon Transect Ecosystem Research) project was supported by the PLDS (Pilot Land Data System) with several data management services, such as data inventory, certification, and publication. After a brief description of these services, experiences in providing them are compared with earlier data management efforts and some conclusions regarding data management in support of interdisciplinary science are discussed. In addition to providing these services, a major goal of this data management capability was to adopt characteristics of a pro-active attitude, such as flexibility and responsiveness, believed to be crucial for the effective conduct of active, interdisciplinary science. These are also itemized and compared with previous data management support activities. Identifying and improving these services and characteristics can lead to the design and implementation of optimal data management support capabilities, which can result in higher quality science and data products from future interdisciplinary field experiments.

  16. Mechanisms of support of “green” projects financing: experience of countries

    Directory of Open Access Journals (Sweden)

    Ivan D. Rakov

    2017-06-01

    Full Text Available Objective to assess the effectiveness of the mechanisms supporting ldquogreenrdquo projectsrsquo funding in developed countries and in Russia. Methods comparative analysis regression analysis. Results the article substantiates the necessity of mainstreaming the environmental protection issues under modern conditions of the world economy development. It is emphasized that despite the advantages of the development of ldquogreenrdquo economy for society as a whole the market highlights a variety of hindering factors. In this context it is increasingly important to study the experience of countries in implementing projects on ldquogreenrdquo economy formation. We analyze the experience of Great Britain in creating special institutions to support ldquogreenrdquo investment raising funds mainly through the use of credit and warranty programs. The UK also demonstrates the experience of applying environmental taxes and a wide range of environmental financial products. Analysis of the experience of South Korea showed the country39s strategy for ldquogreenrdquo growth and the functioning of a framework law providing financial support to ldquogreenrdquo companies and private investment in this area. The experience of Canada province of Ontario shows that in the field of ldquogreenrdquo economy such support mechanisms are applied as ldquogreenrdquo bonds preferential tariff programs etc. Germany also demonstrates progress in addressing environmental problems by imposing requirements for the population in this area as well as the creation of preferential programs of financing ldquogreenrdquo projects. The analysis showed that in contrast to the studied countries in Russia there is no comprehensive mechanism of state support for environmental projects. The existing mechanisms are associated with the implementation of state programs in the sphere of hightech industries. Basing on regression analysis we estimated the influence of state support measures for

  17. Characteristics of team briefings in gynecological surgery.

    Science.gov (United States)

    Forsyth, Katherine L; Hildebrand, Emily A; Hallbeck, M Susan; Branaghan, Russell J; Blocker, Renaldo C

    2018-02-24

    Preoperative briefings have been proven beneficial for improving team performance in the operating room. However, there has been minimal research regarding team briefings in specific surgical domains. As part of a larger project to develop a briefing structure for gynecological surgery, the study aimed to better understand the current state of pre-operative team briefings in one department of an academic hospital. Twenty-four team briefings were observed and video recorded. Communication was analyzed and social network metrics were created based on the team member verbal interactions. Introductions occurred in only 25% of the briefings. Network analysis revealed that average team briefings exhibited a hierarchical structure of communication, with the surgeon speaking the most frequently. The average network for resident-led briefings displayed a non-hierarchical structure with all team members communicating with the resident. Briefings conducted without a standardized protocol can produce variable communication between the role leading and the team members present. Copyright © 2018 Elsevier Ltd. All rights reserved.

  18. Intra project team disagreement, conflict communications, and team performance in cross-functional new product teams: A decision-making quality perspective

    Directory of Open Access Journals (Sweden)

    Tsun Jin Chang

    2014-02-01

    Full Text Available This paper develops and examines a model of the antecedents and consequences of decision-making comprehensiveness during the new product development process. This model firstly suggests a concave relationship between intrateam task disagreement and decision-making comprehensiveness. It also conjectures that conflict communications influence the effectiveness of decision-making comprehensiveness on new product teams’ performance. An empirical test of the proposed framework involves a survey of 220 cross-functional new product teams. The findings show that an inverse U-shaped relationship exists between intrateam task disagreement and decision-making comprehensiveness. It also indicates that collaborative communication has a negative effect on innovativeness, whereas contentious communication adversely affects constraint adherence. However, decision-making comprehensiveness partially moderates the relationships between conflict communications and team performance. Some managerial and research implications of the findings were also discussed in this study.

  19. Supporting teachers’ collaboration in design teams to develop Technological Pedagogical Content Knowledge: the case of science teachers in Tanzania

    NARCIS (Netherlands)

    Kafyulilo, Ayoub; Fisser, Petra; Voogt, Joke; McBride, R.; Searson, M.

    2013-01-01

    This study assessed the effect of support on the teachers’ collaboration in design teams and development of Technological Pedagogical Content Knowledge (TPACK). The study was carried out in two secondary schools in Tanzania: Chang’ombe and Jitegemee secondary schools. From each school 10 teachers

  20. Student Support Teams: Helping Students Succeed in General Education Classrooms or Working To Place Students in Special Education?

    Science.gov (United States)

    Logan, Kent R.; Hansen, Carol D.; Nieminen, Paul K.; Wright, E. Heath

    2001-01-01

    A study involving 24 elementary teachers found they were not using Student Support Teams (SST) as designed. Teachers believed the primary purpose of SST was to test and place students into special education, referred students with whom they had not been successful, and believed there was a covert evaluation process. (Contains references.)…

  1. Enhancing Mathematical Communication for Virtual Math Teams

    Science.gov (United States)

    Stahl, Gerry; Çakir, Murat Perit; Weimar, Stephen; Weusijana, Baba Kofi; Ou, Jimmy Xiantong

    2010-01-01

    The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT) service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies…

  2. Team-oriented leadership: the interactive effects of leader group prototypicality, accountability, and team identification.

    Science.gov (United States)

    Giessner, Steffen R; van Knippenberg, Daan; van Ginkel, Wendy; Sleebos, Ed

    2013-07-01

    We examined the interactive effects of leader group prototypicality, accountability, and team identification on team-oriented behavior of leaders, thus extending the social identity perspective on leadership to the study of leader behavior. An experimental study (N = 152) supported our hypothesis that leader accountability relates more strongly to team-oriented behavior for group nonprototypical leaders than for group prototypical leaders. A multisource field study with leaders (N = 64) and their followers (N = 209) indicated that this interactive effect is more pronounced for leaders who identify more strongly with their team. We discuss how these findings further develop the social identity analysis of leadership. PsycINFO Database Record (c) 2013 APA, all rights reserved.

  3. Foundations for a Team Oriented Curriculum

    Science.gov (United States)

    Neal, Brandi; Martz, Ben

    2016-01-01

    The business world today values collaboration and team work skills such as those found in the area of project management, business process reengineering, quality circles, etc. In response, the use of group projects permeates many curricula today with varying consequences and levels of success. Technology claims to enhance collaboration in…

  4. Assessment of a Statewide Palliative Care Team Training Course: COMFORT Communication for Palliative Care Teams.

    Science.gov (United States)

    Wittenberg, Elaine; Ferrell, Betty; Goldsmith, Joy; Ragan, Sandra L; Paice, Judith

    2016-07-01

    Despite increased attention to communication skill training in palliative care, few interprofessional training programs are available and little is known about the impact of such training. This study evaluated a communication curriculum offered to interprofessional palliative care teams and examined the longitudinal impact of training. Interprofessional, hospital-based palliative care team members were competitively selected to participate in a two-day training using the COMFORT(TM SM) (Communication, Orientation and options, Mindful communication, Family, Openings, Relating, Team) Communication for Palliative Care Teams curriculum. Course evaluation and goal assessment were tracked at six and nine months postcourse. Interprofessional palliative care team members (n = 58) representing 29 teams attended the course and completed course goals. Participants included 28 nurses, 16 social workers, 8 physicians, 5 chaplains, and one psychologist. Precourse surveys assessed participants' perceptions of institution-wide communication performance across the continuum of care and resources supporting optimum communication. Postcourse evaluations and goal progress monitoring were used to assess training effectiveness. Participants reported moderate communication effectiveness in their institutions, with the weakest areas being during bereavement and survivorship care. Mean response to course evaluation across all participants was greater than 4 (scale of 1 = low to 5 = high). Participants taught an additional 962 providers and initiated institution-wide training for clinical staff, new hires, and volunteers. Team member training improved communication processes and increased attention to communication with family caregivers. Barriers to goal implementation included a lack of institutional support as evidenced in clinical caseloads and an absence of leadership and funding. The COMFORT(TM SM) communication curriculum is effective palliative care communication

  5. Leader–Member Skill Distance, Team Cooperation, and Team Performance

    DEFF Research Database (Denmark)

    Tian, Longwei; Li, Yuan; Li, Peter Ping

    2015-01-01

    –member skill distance on team performance. We find the empirical support for our views with a mixed-methods design: a qualitative study interviewing informants in different cultures to clarify the psychological mechanisms, and also a quantitative study analyzing the data from US’s National Basketball...

  6. Operational research within a Global Fund supported tuberculosis project in India: why, how and its contribution towards change in policy and practice

    Science.gov (United States)

    Sagili, Karuna D; Satyanarayana, Srinath; Chadha, Sarabjit S; Wilson, Nevin C; Kumar, Ajay M V; Oeltmann, John E; Chadha, Vineet K; Nagaraja, Sharath Burugina; Ghosh, Smita; Q Lo, Terrence; Volkmann, Tyson; Willis, Matthew; Shringarpure, Kalpita; Reddy, Ravichandra Chinnappa; Kumar, Prahlad; Nair, Sreenivas A; Rao, Raghuram; Yassin, Mohammed; Mwangala, Perry; Zachariah, Rony; Tonsing, Jamhoih; Harries, Anthony D; Khaparde, Sunil

    2018-01-01

    ABSTRACT Background: The Global Fund encourages operational research (OR) in all its grants; however very few reports describe this aspect. In India, Project Axshya was supported by a Global Fund grant to improve the reach and visibility of the government Tuberculosis (TB) services among marginalised and vulnerable communities. OR was incorporated to build research capacity of professionals working with the national TB programme and to generate evidence to inform policies and practices. Objectives: To describe how Project Axshya facilitated building OR capacity within the country, helped in addressing several TB control priority research questions, documented project activities and their outcomes, and influenced policy and practice. Methods: From September 2010 to September 2016, three key OR-related activities were implemented. First, practical output-oriented modular training courses were conducted (n = 3) to build research capacity of personnel involved in the TB programme, co-facilitated by The Union, in collaboration with the national TB programme, WHO country office and CDC, Atlanta. Second, two large-scale Knowledge, Attitude and Practice (KAP) surveys were conducted at baseline and mid-project to assess the changes pertaining to TB knowledge, attitudes and practices among the general population, TB patients and health care providers over the project period. Third, studies were conducted to describe the project’s core activities and outcomes. Results: In the training courses, 44 participant teams were supported to develop research protocols on topics of national priority, resulting in 28 peer-reviewed scientific publications. The KAP surveys and description of project activities resulted in 14 peer-reviewed publications. Of the published papers at least 12 have influenced change in policy or practice. Conclusions: OR within a Global Fund supported TB project has resulted in building OR capacity, facilitating research in areas of national priority and

  7. The Workings of a Multicultural Research Team

    Science.gov (United States)

    Friedemann, Marie-Luise; Pagan-Coss, Harald; Mayorga, Carlos

    2013-01-01

    Purpose Transcultural nurse researchers are exposed to the challenges of developing and maintaining a multiethnic team. With the example of a multicultural research study of family caregivers conducted in the Miami-Dade area, the authors guide the readers through steps of developing a culturally competent and effective team. Design Pointing out challenges and successes, the authors illustrate team processes and successful strategies relative to recruitment of qualified members, training and team maintenance, and evaluation of team effectiveness. Method With relevant concepts from the literature applied to practical examples, the authors demonstrate how cultural team competence grows in a supportive work environment. PMID:18390824

  8. Are High Achievers Successful in Collaborative Learning? An Explorative Study of College Students' Learning Approaches in Team Project-Based Learning

    Science.gov (United States)

    Lee, Hye-Jung; Kim, Hyekyung; Byun, Hyunjung

    2017-01-01

    This study analyses how high-achieving students approach team project-based learning (TPBL) and aims to identify the implications and challenges of TPBL practice in higher education. After interviewing 32 high-achieving students and surveying 1022 additional students at a South Korean university, we found that four factors were particularly…

  9. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  10. Turbine and Structural Seals Team Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — Seals Team Facilities conceive, develop, and test advanced turbine seal concepts to increase efficiency and durability of turbine engines. Current projects include...

  11. 'TeamUP': An approach to developing teamwork skills in undergraduate midwifery students.

    Science.gov (United States)

    Hastie, Carolyn Ruth

    2018-03-01

    to develop an effective model to enable educators to teach, develop and assess the development of midwifery students' teamwork skills DESIGN: an action research project involving participant interviews and academic feedback. a regional university PARTICIPANTS: midwifery students (n = 21) and new graduate midwives (n = 20) INTERVENTIONS: a whole of course program using a rubric, with five teamwork domains and behavioural descriptors, to provide a framework for teaching and assessment. Students self and peer assess. Lectures, tutorials and eight different groupwork assignments of increasing difficulty, spread over the three years of the undergraduate degree are incorporated into the TeamUP model. the assignments provide students with the opportunity to practice and develop their teamwork skills in a safe, supported environment. the social, emotional and practical behaviours required for effective teamwork can be taught and developed in undergraduate health students. students require a clear overview of the TeamUP model at the beginning of the degree. They need to be informed of the skills and behaviours that the TeamUP model is designed to help develop and why they are important. The success of the model depends upon the educator's commitment to supporting students to learn teamwork skills. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.

  12. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  13. A recent Cleanroom success story: The Redwing project

    Science.gov (United States)

    Hausler, Philip A.

    1992-12-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  14. Early Assessment of VIIRS On-Orbit Calibration and Support Activities

    Science.gov (United States)

    Xiong, Xiaoxiong; Chiang, Kwofu; McIntire, Jeffrey; Oudrari, Hassan; Wu, Aisheng; Schwaller, Mathew; Butler, James

    2012-01-01

    The Suomi National Polar-orbiting Partnership (S-NPP) satellite, formally the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP), provides a bridge between current and future low-Earth orbiting weather and environmental observation satellite systems. The NASA s NPP VIIRS Characterization Support Team (VCST) is designed to assess the long term geometric and radiometric performance of the Visible Infrared Imaging Radiometer Suite (VIIRS) instrument onboard the S-NPP spacecraft and to support NPP Science Team Principal Investigators (PI) for their independent evaluation of VIIRS Environmental Data Records (EDRs). This paper provides an overview of Suomi NPP VIIRS on-orbit calibration activities and examples of sensor initial on-orbit performance. It focuses on the radiometric calibration support activities and capabilities provided by the NASA VCST.

  15. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  16. TEAM ATTITUDE EVALUATION: AN EVALUATION IN HOSPITAL COMMITTEES.

    Science.gov (United States)

    Hekmat, Somayeh Noori; Dehnavieh, Reza; Rahimisadegh, Rohaneh; Kohpeima, Vahid; Jahromi, Jahromi Kohpeima

    2015-12-01

    Patients' health and safety is not only a function of complex treatments and advanced therapeutic technologies but also a function of a degree based on which health care professionals fulfill their duties effectively as a team. The aim of this study was to determine the attitude of hospital committee members about teamwork in Kerman hospitals. This study was conducted in 2014 on 171 members of clinical teams and committees of four educational hospitals in Kerman University of Medical Sciences. To collect data, the standard "team attitude evaluation" questionnaire was used. This questionnaire consisted of five domains which evaluated the team attitude in areas related to the team structure, leadership, situation monitoring, mutual support, and communication in the form of a 5-point Likert type scale. To analyze data, descriptive statistical tests, T-test, ANOVA, and linear regression were used. The average score of team attitude for hospital committee members was 3.9 out of 5. The findings showed that leadership had the highest score among the subscales of team work attitude, while mutual support had the lowest score. We could also observe that responsibility was an important factor in participants' team work attitude (β = -0.184, p = 0.024). Comparing data in different subgroups revealed that employment, marital status, and responsibility were the variables affecting the participants' attitudes in the team structure domain. Marital status played a role in leadership; responsibility had a role in situation monitoring; and work experience played a role in domains of communication and mutual support. Hospital committee members had a positive attitude towards teamwork. Training hospital staff and paying particular attention to key elements of effectiveness in a health care team can have a pivotal role in promoting the team culture.

  17. Team Organization Method Using Salary Auction Game for Sustainable Motivation

    Directory of Open Access Journals (Sweden)

    Sangkyun Kim

    2015-10-01

    Full Text Available In performing team-based projects in engineering class, students usually face many problems, such as free-riding, lack of responsibility, boredom, and insufficient initiative. This papers proposes a new method for performing team-based projects in engineering class—specifically, a gamified method for team organization using a salary auction game. On the description of the design and use of a salary auction game in engineering class, a case study conducted using a survey method is reported to validate the practical value of the proposed auction game. The salary auction game proposed in this paper demonstrates that a gamified team organization method in engineering class could be used as an effective tool to enhance motivation and to improve learning outcomes of engineering students.

  18. [Communication in the Family Health Program: the health agent as an integrating link between the team and the community].

    Science.gov (United States)

    Cardoso, Andréia dos Santos; Nascimento, Marilene Cabral do

    2010-06-01

    This study is part of the project Evaluation of the Family Health Strategy in Rio de Janeiro, developed at Estácio de Sá University with support of the National Advice of Scientific and Technological Development (CNPq). The study aimed to identify and analyze the perception of the health communitarian agents (HCA) about their main interlocutors, the impact of these interlocutors and the predominant communication forms in their work process. It is a descriptive study, with a qualitative approach, based on theoretical-methodological categories of the popular education and the symbolic market communication model. The data was collected in four teams of the Family Health Program. The results show the communication maps elaborated with the HCA which identifies the group of technical support, the technician team, the HCA themselves and the old inhabitants of the community as their main interlocutors. The communication with the other professionals of the team is acknowledged in a predominantly verticalized way with authoritarianism traces. The results highlight the importance of extending the dialogue and negotiation in the established communication within the team and with the community.

  19. The return map: tracking product teams.

    Science.gov (United States)

    House, C H; Price, R L

    1991-01-01

    With a new product, time is now more valuable than money. The costs of conceiving and designing a product are less important to its ultimate success than timeliness to market. One of the most important ways to speed up product development is through interfunctional teamwork. The "Return Map," developed at Hewlett-Packard, provides a way for people from different functions to triangulate on the product development process as a whole. It graphically represents the contributions of all team members to the moment when a project breaks even. It forces the team to estimate and re-estimate the time it will take to perform critical tasks, so that products can get out fast. It subjects the team to the only discipline that works, namely, self-discipline. The map is, in effect, a graph representing time and money, where the time line is divided into three phases: investigation, development, and manufacturing and sales. Meanwhile, costs are plotted against time--as are revenues when they are realized after manufacturing release. Within these points of reference, four novel metrics emerge: Break-Even-Time, Time-to-Market, Break-Even-After-Release, and the Return Factor. All metrics are estimated at the beginning of a project to determine its feasibility, then they are tracked carefully while the project evolves to determine its success. Missed forecasts are inevitable, but managers who punish employees for missing their marks will only encourage them to estimate conservatively, thus building slack into a system meant to eliminate slack. Estimates are a team responsibility, and deviations provide valuable information that spurs continuous investigation and improvement.

  20. Team Learning in Teacher Teams: Team Entitativity as a Bridge between Teams-in-Theory and Teams-in-Practice

    Science.gov (United States)

    Vangrieken, Katrien; Dochy, Filip; Raes, Elisabeth

    2016-01-01

    This study aimed to investigate team learning in the context of teacher teams in higher vocational education. As teacher teams often do not meet all criteria included in theoretical team definitions, the construct "team entitativity" was introduced. Defined as the degree to which a group of individuals possesses the quality of being a…