WorldWideScience

Sample records for submittal requirements zfor

  1. 24 CFR 3282.354 - Submittal of false information or refusal to submit information.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Submittal of false information or... ENFORCEMENT REGULATIONS Primary Inspection Agencies § 3282.354 Submittal of false information or refusal to submit information. The submittal of false information or the refusal to submit information required...

  2. 40 CFR 73.13 - Procedures for submittals.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Procedures for submittals. 73.13 Section 73.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Allocations § 73.13 Procedures for submittals. (a...

  3. Annotation, submission and screening of repetitive elements in Repbase: RepbaseSubmitter and Censor

    Directory of Open Access Journals (Sweden)

    Hankus Lukasz

    2006-10-01

    Full Text Available Abstract Background Repbase is a reference database of eukaryotic repetitive DNA, which includes prototypic sequences of repeats and basic information described in annotations. Updating and maintenance of the database requires specialized tools, which we have created and made available for use with Repbase, and which may be useful as a template for other curated databases. Results We describe the software tools RepbaseSubmitter and Censor, which are designed to facilitate updating and screening the content of Repbase. RepbaseSubmitter is a java-based interface for formatting and annotating Repbase entries. It eliminates many common formatting errors, and automates actions such as calculation of sequence lengths and composition, thus facilitating curation of Repbase sequences. In addition, it has several features for predicting protein coding regions in sequences; searching and including Pubmed references in Repbase entries; and searching the NCBI taxonomy database for correct inclusion of species information and taxonomic position. Censor is a tool to rapidly identify repetitive elements by comparison to known repeats. It uses WU-BLAST for speed and sensitivity, and can conduct DNA-DNA, DNA-protein, or translated DNA-translated DNA searches of genomic sequence. Defragmented output includes a map of repeats present in the query sequence, with the options to report masked query sequence(s, repeat sequences found in the query, and alignments. Conclusion Censor and RepbaseSubmitter are available as both web-based services and downloadable versions. They can be found at http://www.girinst.org/repbase/submission.html (RepbaseSubmitter and http://www.girinst.org/censor/index.php (Censor.

  4. Data requirement comparison between the fixed site upgrade rule guidance compendium and the Structured Assessment Approach Licensee Submittal Document

    Energy Technology Data Exchange (ETDEWEB)

    Parziale, A.A.; Sacks, I.J.

    1980-12-01

    We compared the Structured Assessment Approach's (SAA) Licensee Submittal Document (LSD) with the Fixed Site Physical Protection Upgrade Rule Guidance Compendium Standard Format and Content (SFC) Guide using correlation matrices to see how well the data requirements of the SFC Guide coincided with those of a specific automated vulnerability assessment technique for fixed-site nuclear fuel cycle facilities, namely, SAA. We found that a limited SAA assessment is possible using the SFC Guide, but significant and critical safeguards vulnerabilities might be missed. Also, it was found that in some cases the organization and format of the SFC Guide input data and information made the preparation of data for the SAA somewhat awkward. 2 refs., 2 tabs.

  5. Instructions for submittal and control of FFTF design documents and design related documentation

    International Nuclear Information System (INIS)

    Grush, R.E.

    1976-10-01

    This document provides the system and requirements for management of FFTF technical data prepared by Westinghouse Hanford (HEDL), and design contractors, the construction contractor and lower tier equipment suppliers. Included in this document are provisions for the review, approval, release, change control, and accounting of FFTF design disclosure and base documentation. Also included are provisions for submittal of other design related documents for review and approval consistent with applicable requirements of RDT-Standard F 2-2, ''Quality Assurance Program Requirements.''

  6. 10 CFR 455.110 - Grant application submittals for technical assistance and energy conservation measures.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Grant application submittals for technical assistance and... Grant application submittals for technical assistance and energy conservation measures. (a) Each... assistance for energy conservation measures, including renewable resource measures, shall include the...

  7. 7 CFR 900.311 - Submittals or requests.

    Science.gov (United States)

    2010-01-01

    ... Conduct of Referenda To Determine Producer Approval of Milk Marketing Orders To Be Made Effective Pursuant to Agricultural Marketing Agreement Act of 1937, as Amended § 900.311 Submittals or requests... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing...

  8. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance of records for urban bus... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal...

  9. 43 CFR 2.33 - How will the Department notify you and the submitter of commercial or financial information when...

    Science.gov (United States)

    2010-10-01

    ... submitter of commercial or financial information when it makes an appeal decision concerning such... submitter of commercial or financial information when it makes an appeal decision concerning such... Department will notify the submitter within 10 workdays of receipt of the court complaint if you file a...

  10. 22 CFR 706.42 - When will OPIC notify business submitters of a pending FOIA request?

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true When will OPIC notify business submitters of a pending FOIA request? 706.42 Section 706.42 Foreign Relations OVERSEAS PRIVATE INVESTMENT CORPORATION....42 When will OPIC notify business submitters of a pending FOIA request? (a) Except as provided in...

  11. 40 CFR 130.10 - State submittals to EPA.

    Science.gov (United States)

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.10 State submittals to EPA. (a) The following must be submitted...)(1). (Approved by the Office of Management and Budget under control number 2040-0071) (3) Total maximum daily loads (TMDLs) (303(d)); and (4) Water quality management (WQM) plan and certified and...

  12. 40 CFR 86.1847-01 - Manufacturer in-use verification and in-use confirmatory testing; submittal of information and...

    Science.gov (United States)

    2010-07-01

    ... laboratory equipment calibrations and verifications as prescribed by subpart B of this part or by good... in-use confirmatory testing; submittal of information and maintenance of records. 86.1847-01 Section... confirmatory testing; submittal of information and maintenance of records. (a) The manufacturer who conducts or...

  13. 42 CFR 431.816 - Case review completion deadlines and submittal of reports.

    Science.gov (United States)

    2010-10-01

    ... completion deadlines and submittal of reports. (a) The agency must complete case reviews and submit reports..., the agency must complete case reviews and submit reports of findings to CMS in accordance with... eligibility reviews—MAO stratum. (i) The agency must complete case eligibility reviews and report the findings...

  14. 39 CFR 265.8 - Business information; procedures for predisclosure notification to submitters.

    Science.gov (United States)

    2010-07-01

    ... containing the business information. In the case of an administrative appeal, the General Counsel shall be... the time of its submission. (1) Submitters of business information shall use good-faith efforts to... 39 Postal Service 1 2010-07-01 2010-07-01 false Business information; procedures for predisclosure...

  15. 40 CFR 64.4 - Submittal requirements.

    Science.gov (United States)

    2010-07-01

    ... used to support the justification (such as generally available air pollution engineering manuals, or... permitting authority monitoring that satisfies the design requirements in § 64.3. The submission shall include the following information: (1) The indicators to be monitored to satisfy §§ 64.3(a)(1)-(2); (2...

  16. 42 CFR 431.988 - Eligibility case review completion deadlines and submittal of reports.

    Science.gov (United States)

    2010-10-01

    ... Eligibility case review completion deadlines and submittal of reports. (a)(1) States must complete and report...) States must submit a summary report of the active case eligibility and payment review findings to CMS by... 42 Public Health 4 2010-10-01 2010-10-01 false Eligibility case review completion deadlines and...

  17. 75 FR 58411 - Center for Veterinary Medicine eSubmitter Workshop; Public Workshop; Request for Comments

    Science.gov (United States)

    2010-09-24

    ...] Center for Veterinary Medicine eSubmitter Workshop; Public Workshop; Request for Comments AGENCY: Food... Drug Administration (FDA) is announcing a public workshop entitled: ``Center for Veterinary Medicine... be emailed to all registrants. Contact Person: Charles Andres, Center for Veterinary Medicine (HFV...

  18. 76 FR 60941 - Policy Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium...

    Science.gov (United States)

    2011-09-30

    ... Processing of Equivalent Feed at Licensed Uranium Recovery Facilities AGENCY: Nuclear Regulatory Commission... State-licensed uranium recovery site, either conventional, heap leach, or in situ recovery. DATES... Regarding Submittal of Amendments for Processing of Equivalent Feed at Licensed Uranium Recovery Facilities...

  19. 40 CFR 73.18 - Submittal procedures for units commencing commercial operation during the period from January 1...

    Science.gov (United States)

    2010-07-01

    ... commencing commercial operation during the period from January 1, 1993, through December 31, 1995. 73.18 Section 73.18 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Allocations § 73.18 Submittal procedures for units...

  20. Preliminary perspectives gaines from individual plant examination of external events (IPEEE) seismic and fire submittal review

    International Nuclear Information System (INIS)

    Chen, J.T.; Connell, E.; Chokshi, N.

    1997-01-01

    As a result of the U.S. Nuclear Regulatory Commission (USNRC) initiated Individual plant Examination of External Events (IPEEE) program, every operating nuclear power reactor in the United States has performed an assessment of severe accident due to external events. This paper provides a summary of the preliminary insights gained through the review of 24 IPEEE submittals

  1. 40 CFR 86.1862-04 - Maintenance of records and submittal of information relevant to compliance with fleet average NOX...

    Science.gov (United States)

    2010-07-01

    ... of information relevant to compliance with fleet average NOX standards. 86.1862-04 Section 86.1862-04...-Cycle Heavy-Duty Vehicles § 86.1862-04 Maintenance of records and submittal of information relevant to..., maintain, and retain the following information in adequately organized and indexed records for each model...

  2. 40 CFR 152.95 - Citation of all studies in the Agency's files pertinent to a specific data requirement.

    Science.gov (United States)

    2010-07-01

    ... PROCEDURES Procedures To Ensure Protection of Data Submitters' Rights § 152.95 Citation of all studies in the... requirement. The applicant who selects this cite-all option must submit to the Agency: (a) A general offer to... may be limited to apply only to data pertinent to the specific data requirement(s) for which the cite...

  3. Hanford low-level vitrification melter testing -- Master list of data submittals

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1995-01-01

    The Westinghouse Hanford Company (WHC) is conducting a two-phased effort to evaluate melter system technologies for vitrification of liquid low-level radioactive waste (LLW) streams. The evaluation effort includes demonstration testing of selected glass melter technologies and technical reports regarding the applicability of the glass melter technologies to the vitrification of Hanford LLW tank waste. The scope of this document is to identify and list vendor document submittals in technology demonstration support of the Hanford Low-Level Waste Vitrification melter testing program. The scope of this document is limited to those documents responsive to the Statement of Work, accepted and issued by the LLW Vitrification Program. The purpose of such a list is to maintain configuration control of vendor supplied data and to enable ready access to, and application of, vendor supplied data in the evaluation of melter technologies for the vitrification of Hanford low-level tank wastes

  4. 76 FR 81727 - Approval and Promulgation of Implementation Plans; Oklahoma; Federal Implementation Plan for...

    Science.gov (United States)

    2011-12-28

    ... separately assessed the costs of installation of controls for these units using well established costing... particulate matter National Ambient Air Quality Standards. This CAA requirement is intended to prevent... fails to make a required SIP submittal or we find that the state's submittal is incomplete or...

  5. 40 CFR 51.493 - State program requirements.

    Science.gov (United States)

    2010-07-01

    ..., the current ridership rates, and the availability and usage of parking facilities. (7) Information... rates. (iii) Mass balance calculations which are a function of inventory, usage, and/or disposal records... support of the SIP submittal, a statistical showing that the specified averaging time is consistent with...

  6. 77 FR 40914 - In the Matter of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory...

    Science.gov (United States)

    2012-07-11

    ... Company met in an ADR session mediated by a professional mediator, arranged through Cornell University's... counsel or representative) to digitally sign documents and access the E-Submittal server for any... requirements for accessing the E-Submittal server are detailed in the NRC's ``Guidance for Electronic...

  7. 40 CFR 152.93 - Citation of a previously submitted valid study.

    Science.gov (United States)

    2010-07-01

    ... Data Submitters' Rights § 152.93 Citation of a previously submitted valid study. An applicant may demonstrate compliance for a data requirement by citing a valid study previously submitted to the Agency. The... the original data submitter, the applicant may cite the study only in accordance with paragraphs (b...

  8. 75 FR 33358 - Duke Energy Carolinas, LLC; McGuire Nuclear Station; Confirmatory Order (Effective Immediately)

    Science.gov (United States)

    2010-06-11

    ... Energy met in an ADR session mediated by a professional mediator, which was arranged through Cornell... representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is... requirements for accessing the E-Submittal server are detailed in NRC's ``Guidance for Electronic Submission...

  9. Environmental management requirements/defensible costs project. Final report

    International Nuclear Information System (INIS)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent open-quotes Murder Board.close quotes Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters' budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management

  10. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  11. USING CFD TO ANALYZE NUCLEAR SYSTEMS BEHAVIOR: DEFINING THE VALIDATION REQUIREMENTS

    Energy Technology Data Exchange (ETDEWEB)

    Richard Schultz

    2012-09-01

    A recommended protocol to formulate numeric tool specifications and validation needs in concert with practices accepted by regulatory agencies for advanced reactors is described. The protocol is based on the plant type and perceived transient and accident envelopes that translates to boundary conditions for a process that gives the: (a) key phenomena and figures-of-merit which must be analyzed to ensure that the advanced plant can be licensed, (b) specification of the numeric tool capabilities necessary to perform the required analyses—including bounding calculational uncertainties, and (c) specification of the validation matrices and experiments--including the desired validation data. The result of applying the process enables a complete program to be defined, including costs, for creating and benchmarking transient and accident analysis methods for advanced reactors. By following a process that is in concert with regulatory agency licensing requirements from the start to finish, based on historical acceptance of past licensing submittals, the methods derived and validated have a high probability of regulatory agency acceptance.

  12. New source terms and the implications for emergency planning requirements at nuclear power plants in the United State

    International Nuclear Information System (INIS)

    Kaiser, G.D.; Cheok, M.C.

    1987-01-01

    This paper begins with a brief review of current approaches to source term driven changes to NRC emergency planning requirements and addresses significant differences between them. Approaches by IDCOR and EPRI, industry submittals to NRC and alternative risk-based evaluations have been considered. Important issues are discussed, such as the role of Protective Action Guides in determining the radius of the emergency planning zone (EPZ). The significance of current trends towards the prediction of longer warning times and longer durations of release in new source terms is assessed. These trends may help to relax the current notification time requirements. Finally, the implications of apparent support in the regulations for a threshold in warning time beyond which ad hoc protective measures are adequate is discussed

  13. Reviewing PSA-based analyses to modify technical specifications at nuclear power plants

    International Nuclear Information System (INIS)

    Samanta, P.K.; Martinez-Guridi, G.; Vesely, W.E.

    1995-12-01

    Changes to Technical Specifications (TSs) at nuclear power plants (NPPs) require review and approval by the United States Nuclear Regulatory Commission (USNRC). Currently, many requests for changes to TSs use analyses that are based on a plant's probabilistic safety assessment (PSA). This report presents an approach to reviewing such PSA-based submittals for changes to TSs. We discuss the basic objectives of reviewing a PSA-based submittal to modify NPP TSs; the methodology of reviewing a TS submittal, and the differing roles of a PSA review, a PSA Computer Code review, and a review of a TS submittal. To illustrate this approach, we discuss our review of changes to allowed outage time (AOT) and surveillance test interval (STI) in the TS for the South Texas Project Nuclear Generating Station. Based on this experience gained, a check-list of items is given for future reviewers; it can be used to verify that the submittal contains sufficient information, and also that the review has addressed the relevant issues. Finally, recommended steps in the review process and the expected findings of each step are discussed

  14. 40 CFR 71.8 - Affected State review.

    Science.gov (United States)

    2010-07-01

    ... submittal of the proposed permit to the Administrator (or as soon as possible after the submittal for minor... in § 71.2 on or before the time that the permitting authority provides this notice to the public pursuant to § 71.7 or § 71.11(d) except to the extent § 71.7(e)(1) or (2) requires the timing of the notice...

  15. Clarification of TMI action plan requirements. Technical report

    International Nuclear Information System (INIS)

    1980-11-01

    This document, NUREG-0737, is a letter from D.G. Eisenhut, Director of the Division of Licensing, NRR, to licensees of operating power reactors and applicants for operating licenses forwarding post-TMI requirements which have been approved for implementation. Following the accident at Three Mile Island Unit 2, the NRC staff developed the Action Plan, NUREG-0660, to provide a comprehensive and integrated plan to improve safety at power reactors. Specific items from NUREG-0660 have been approved by the Commission for implementation at reactors. In this NRC report, these specific items comprise a single document which includes additional information about schedules, applicability, method of implementation review, submittal dates, and clarification of technical positions. It should be noted that the total set of TMI-related actions have been collected in NUREG-0660, but only those items that the Commission has approved for implementation to date are included in this document, NUREG-0737

  16. ATTITUDES OF PEOPLE IN THE THAI CONSTRUCTION INDUSTRY SECTOR ON ISSUES RELATED TO DELAY IN THE APPROVAL OF SUBMITTALS

    Directory of Open Access Journals (Sweden)

    Visuth Chovichien

    2011-10-01

    Full Text Available This study investigated attitudes in the Thai construction industry sector towards 21 issues related to “delay in the approval of submittals” that may initiate conflicts among various parties. Knowledge gained from this study can be applied to the analyses of the completeness and appropriateness of contract conditions and to improve contract drafting. The attitudes of the majority of people in the industry towards several issues related to the time frame for the approval of submittals, compensation for cost increases and profit losses, and time frames for notifications of delayed approval and claim submission were found to be inconsistent with existing conditions in standard contracts. Various issues that are not covered in the standard contract forms, such as the time frame for providing reminders and the types of time loss and direct costs that can be claimed, were also found to have high tendencies to initiate conflicts between contracting parties. Finally, we also found that the organisational affiliation of the respondents (i.e., employer or contractor influenced their attitudes towards some, but not all, contractual issues.

  17. 1995 Toxic chemical release inventory: Emergency Planning and Community Right-to-Know Act of 1986, Section 313

    International Nuclear Information System (INIS)

    Mincey, S.L.

    1996-08-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act (EPCRA) requires the annual submittal of toxic chemical release information to the U.S. Environmental Protection Agency.Executive Order 12856, 'Federal Compliance With Right-to-Know Laws and Pollution Prevention Requirements' extends the requirements of EPCRA to all Federal agencies. The following document is the August 1996 submittal of the Hanford Site Toxic Chemical Release Inventory report. Included is a Form R for ethylene glycol, the sole chemical used in excess of the established regulatory thresholds at the Hanford Site by the U.S. Department of Energy, Richland Operations Office and its contractors during Calendar Year 1995

  18. 40 CFR 86.1844-01 - Information requirements: Application for certification and submittal of information upon request.

    Science.gov (United States)

    2010-07-01

    ... schematic diagrams and hose and wire routings which describe the fundamental operating characteristics of... describes each emission control diagnostic system required by § 86.1806-01 including: (i) A description of the functional operation characteristics of the diagnostic system; (ii) The general method of...

  19. NWTS program criteria for mined geologic disposal of nuclear waste: program objectives, functional requirements, and system performance criteria

    International Nuclear Information System (INIS)

    1981-04-01

    At the present time, final repository criteria have not been issued by the responsible agencies. This document describes general objectives, requirements, and criteria that the DOE intends to apply in the interim to the National Waste Terminal Storage (NWTS) Program. These objectives, requirements, and criteria have been developed on the basis of DOE's analysis of what is needed to achieve the National objective of safe waste disposal in an environmentally acceptable and economic manner and are expected to be consistent with anticipated regulatory standards. The qualitative statements in this document address the broad issues of public and occupational health and safety, institutional acceptability, engineering feasibility, and economic considerations. A comprehensive set of criteria, general and project specific, of which these are a part, will constitute a portion of the technical basis for preparation and submittal by the DOE of formal documents to support future license applications for nuclear waste repositories

  20. NWTS program criteria for mined geologic disposal of nuclear waste: program objectives, functional requirements, and system performance criteria

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-04-01

    At the present time, final repository criteria have not been issued by the responsible agencies. This document describes general objectives, requirements, and criteria that the DOE intends to apply in the interim to the National Waste Terminal Storage (NWTS) Program. These objectives, requirements, and criteria have been developed on the basis of DOE's analysis of what is needed to achieve the National objective of safe waste disposal in an environmentally acceptable and economic manner and are expected to be consistent with anticipated regulatory standards. The qualitative statements in this document address the broad issues of public and occupational health and safety, institutional acceptability, engineering feasibility, and economic considerations. A comprehensive set of criteria, general and project specific, of which these are a part, will constitute a portion of the technical basis for preparation and submittal by the DOE of formal documents to support future license applications for nuclear waste repositories.

  1. 40 CFR Table 9 to Subpart Jjj of... - Routine Reports Required by This Subpart

    Science.gov (United States)

    2010-07-01

    ... Approval of a Nominal Control Efficiency for Use in Emissions Averaging Initial submittal is due with the... months of making the determination. a There may be two versions of this report due at different times... There will be two versions of this report due at different times; one for equipment subject to § 63.1331...

  2. 78 FR 56708 - Announcement of Requirements and Registration for Game On!: HIV/STD Prevention Mobile Application...

    Science.gov (United States)

    2013-09-13

    ...'' -Many STDs are curable and all are treatable. There are effective medications available to help people... years old at the time of entry. If the contestant/submitter is younger than 18 at the time of entry, the..., finalists, and winners of the contest. Information is not collected for commercial marketing. Winners are...

  3. 1992 Toxic Chemical Release Inventory: Emergency Planning and Community Right-To-Know-Act of 1986 Section 313

    International Nuclear Information System (INIS)

    1993-07-01

    Section 313 of the Emergency Planning and Community Right-To-Know Act of 1986 (EPCRA) requires the annual submittal of toxic chemical release information to the US Environmental Protection Agency (EPA). The following document is the July 1993 submittal of the EPCRA Toxic Chemical Release Inventory Report (Form R). Included is a Form R for chlorine and for lead, the two chemicals used in excess of the established regulatory thresholds at the Hanford Site by the US Department of Energy, Richland Operations Office and its contractors during calendar year 1992

  4. Acceptable standard format and content for the fundamental nuclear material control (FNMC) plan required for low-enriched uranium facilities. Revision 2

    International Nuclear Information System (INIS)

    Joy, D.R.

    1995-12-01

    This report documents a standard format suggested by the NRC for use in preparing fundamental nuclear material control (FNMC) plans as required by the Low Enriched Uranium Reform Amendments (10CFR 74.31). This report also describes the necessary contents of a comprehensive plan and provides example acceptance criteria which are intended to communicate acceptable means of achieving the performance capabilities of the Reform Amendments. By using the suggested format, the licensee or applicant will minimize administrative problems associated with the submittal, review and approval of the FNMC plan. Preparation of the plan in accordance with this format Will assist the NRC in evaluating the plan and in standardizing the review and licensing process. However, conformance with this guidance is not required by the NRC. A license applicant who employs a format that provides a equal level of completeness and detail may use their own format. This document is also intended for providing guidance to licensees when making revisions to their FNMC plan

  5. 48 CFR 432.006-4 - Procedures.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS CONTRACT FINANCING 432.006-4 Procedures. (a) Immediately upon submittal of the referral described... decision making process. (c) The OIG will determine the need for and the extent of an investigation. (d...

  6. 40 CFR 51.161 - Public availability of information.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Review of New Sources and... advertisement in the area affected of the location of the source information and analysis specified in paragraph... would conflict with existing requirements for acting on requests for permission to construct or modify...

  7. 78 FR 63501 - Request To Submit a Two-Part Application-Northwest Medical Isotopes, LLC

    Science.gov (United States)

    2013-10-24

    ... new accident precursors are created by allowing an applicant to submit a construction permit... certain regulatory requirements, which, if granted, would allow the submittal of a construction permit... facility applicants subject to 10 CFR 51.20(b) \\1\\ may submit the information required for a construction...

  8. 78 FR 21379 - Agency Information Collection Activities; Proposed Collection; Comment Request; Tobacco Health...

    Science.gov (United States)

    2013-04-10

    ... report: Submitter identification: Submitter type, company name, address, country, company headquarters Dun and Bradstreet number, and company headquarters Facility Establishment Identifier number.... Confirmation statement (with identification and signature of submitter including name, company name, address...

  9. 78 FR 49527 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Science.gov (United States)

    2013-08-14

    ...: Submitter type, company name, address, country, company headquarters Dun and Bradstreet number, and company headquarters Facility Establishment Identifier number; Submitter point of contact: Contact name, title... and signature of submitter including name, company name, address, position title, email, telephone...

  10. Integration of CERCLA and RCRA requirements at the Radioactive Waste Burial Grounds, Savannah River Site, Aiken, South Carolina

    International Nuclear Information System (INIS)

    Hoffman, W.D.; Wyatt, D.E.

    1992-01-01

    The purpose of this paper to is present the comprehensive approach being taken at the Savannah River Site (SRS) to consolidate regulatory documents, characterization and assessment activities for 3 contiguous waste management facilities. These facilities cover 7.12 x 10 5 m 2 (194 acres) and include an Old Radioactive Waste Burial Ground, a Low Level Radioactive Waste Disposal Facility, and a closed Mixed Waste Management Facility. Each of these facilities include one or more operable units including solvent tanks, transuranic waste storage pads, research lysimeters and experimental confinement disposal vaults. All of these facilities have differing submittal dates for regulatory documents but similar and continuous environmental problems. The characterization and risk assessment require simultaneous efforts for all facilities to adequately define the nature and extent of past, present and future environmental impact. Current data indicates that contaminant plumes in both soil and water are comingled, interspersed and possibly exist internally within the contiguous facilities, requiring a combined investigative effort. This paper describes the combination of regulatory documents leading to this comprehensive and integrative approach for burial ground characterization at the Savannah River Site

  11. 76 FR 26305 - Agency Information Collection Activities; Proposed Collection; Comment Request; Certification To...

    Science.gov (United States)

    2011-05-06

    ... to satisfy the previously mentioned statutory requirement. The importance of obtaining these data.... Marketing Applications/Submissions In 2010, CDER and CBER received 165 new drug applications (NDA... ANDA marketing applications and submissions. It is assumed that the sponsor/applicant/submitter has...

  12. 40 CFR 350.13 - Sufficiency of assertions.

    Science.gov (United States)

    2010-07-01

    ... following: (i) Either: (A) Competitors do not know or the submitter is not aware that competitors know that... own research and development activities; or (B) Competitors are not aware or the submitter does not know whether competitors are aware that the submitter is using this chemical in this fashion. (ii) The...

  13. 75 FR 30014 - Office of Energy Efficiency and Renewable Energy; Energy Efficiency and Conservation Block Grant...

    Science.gov (United States)

    2010-05-28

    ... submittals for consistency with the requirements of Office of Management and Budget's (OMB) Cost Principles... classes (Basic Financial Assistance and Cost Principles--see the Acquisition Career Management Program... not provided from the National Environmental Policy Act (NEPA) or the Office of Management and Budget...

  14. 78 FR 48417 - Proposed Information Collection; Comment Request; Educational Partnership Program (EPP), Ernest F...

    Science.gov (United States)

    2013-08-08

    ... alumni student data collection are the Dr. Nancy Foster Scholarship Program and the Recruiting, Training.... Method of Collection Electronic applications and electronic forms are required from participants, and the primary methods of submittal are email and Internet transmission of electronic forms. Approximately 1% of...

  15. 78 FR 40966 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Science.gov (United States)

    2013-07-09

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport of Fine Particulate Matter... a State Implementation Plan (SIP) submittal from the State of New Mexico to address Clean Air Act (CAA or Act) requirements that prohibit air emissions which will contribute significantly to...

  16. 40 CFR 51.112 - Demonstration of adequacy.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.112... implements. (1) The adequacy of a control strategy shall be demonstrated by means of applicable air quality... reduction of emissions (or reductions in the growth of emissions) that will result from the implementation...

  17. 78 FR 62455 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia...

    Science.gov (United States)

    2013-10-22

    ... State submittal are available at the District of Columbia Department of the Environment, Air Quality... July 18, 2013, the District Department of the Environment (DDOE) submitted a revision to the District's... states that the relevant section 128 requirements are currently found in chapter 11A ``Government Ethics...

  18. 78 FR 28773 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Control...

    Science.gov (United States)

    2013-05-16

    ... Maryland State Implementation Plan (SIP) submitted by the Maryland Department of the Environment (MDE) on... or otherwise protected through www.regulations.gov or email. The www.regulations.gov Web site is an... which were submitted by MDE on January 10, 2013. The SIP revision submittal adopts the requirements as...

  19. 76 FR 28434 - Notice of Disclosure of Confidential Business Information Obtained Under the Comprehensive...

    Science.gov (United States)

    2011-05-17

    ... analysis; to verify completeness; and to provide technical review of submittals. The contract complies with... Applications International Corp, and its employees, is necessary in order for the company to carry out its work... information only for the purpose of carrying out the work required by the contract, (2) will refrain from...

  20. 32 CFR 1700.10 - Procedures for business information.

    Science.gov (United States)

    2010-07-01

    ... of notice. Communication to a submitter of commercial information shall either describe the exact... instant notice. (ii) When notice is given to a submitter under this section, the ODNI shall also notify...

  1. 40 CFR Appendix L to Part 51 - Example Regulations for Prevention of Air Pollution Emergency Episodes

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Example Regulations for Prevention of Air Pollution Emergency Episodes L Appendix L to Part 51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Pt. 51, App. L Appendix L to Par...

  2. 77 FR 11022 - Approval and Promulgation of Implementation Plans; State of Alaska; Regional Haze State...

    Science.gov (United States)

    2012-02-24

    ... protocol was developed. See Figure III.K.5-2 of the SIP submittal. Included Sources--Emission sources... Implementation Plan (SIP) revision, submitted by the State of Alaska on April 4, 2011, as meeting the.... Requirements for Regional Haze SIPs A. The CAA and the Regional Haze Rule B. Baseline, Natural Conditions, and...

  3. submitter Starting Manufacture of the ITER Central Solenoid

    CERN Document Server

    Libeyre, P; Dolgetta, N; Gaxiola, E; Jong, C; Lyraud, C; Mitchell, N; Journeaux, J Y; Vollmann, T; Evans, D; Sgobba, S; Langeslag, S; Reiersen, W; Martovetsky, N; Everitt, D; Hatfield, D; Rosenblad, P; Litherland, S; Freudenberg, K; Myatt, L; Smith, J; Brazelton, C; Abbott, R; Daubert, J; Rackers, K; Nentwich, T

    2016-01-01

    The central solenoid (CS) is a key component of the ITER magnet system to provide the magnetic flux swing required to drive induced plasma current up to 15 MA. The manufacture of its different subcomponents has now started, following completion of the design analyses and achievement of the qualification of the manufacturing procedures. A comprehensive set of analyses has been produced to demonstrate that the CS final design meets all requirements. This includes in particular structural analyses carried out with different finite-element models and addressing normal and fault conditions. Following the Final Design Review, held in November 2013, and the subsequent design modifications, the analyses were updated for consistency with the final design details and provide evidence that the Magnet Structural Design Criteria are fully met. Before starting any manufacturing activity of a CS component, a corresponding dedicated qualification program has been carried out. This includes manufacture of mockups using the re...

  4. Responding to Mechanical Antigravity

    Science.gov (United States)

    Millis, Marc G.; Thomas, Nicholas E.

    2006-01-01

    Based on the experiences of the NASA Breakthrough Propulsion Physics Project, suggestions are offered for constructively responding to proposals that purport breakthrough propulsion using mechanical devices. Because of the relatively large number of unsolicited submissions received (about 1 per workday) and because many of these involve similar concepts, this report is offered to help the would-be submitters make genuine progress as well as to help reviewers respond to such submissions. Devices that use oscillating masses or gyroscope falsely appear to create net thrust through differential friction or by misinterpreting torques as linear forces. To cover both the possibility of an errant claim and a genuine discovery, reviews should require that submitters meet minimal thresholds of proof before engaging in further correspondence; such as achieving sustained deflection of a level-platform pendulum in the case of mechanical thrusters.

  5. 39 CFR 965.7 - Default.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Default. 965.7 Section 965.7 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO MAIL DISPUTES § 965.7 Default. A party who fails to file the submittal required by § 965.5 may be held in default and the...

  6. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-01-01

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  7. Metabolonote: A wiki-based database for managing hierarchical metadata of metabolome analyses

    Directory of Open Access Journals (Sweden)

    Takeshi eAra

    2015-04-01

    Full Text Available Metabolomics—technology for comprehensive detection of small molecules in an organism—lags behind the other omics in terms of publication and dissemination of experimental data. Among the reasons for this are difficulty precisely recording information about complicated analytical experiments (metadata, existence of various databases with their own metadata descriptions, and low reusability of the published data, resulting in submitters (the researchers who generate the data being insufficiently motivated. To tackle these issues, we developed Metabolonote, a Semantic MediaWiki-based database designed specifically for managing metabolomic metadata. We also defined a metadata and data description format, called TogoMD, with an ID system that is required for unique access to each level of the tree-structured metadata such as study purpose, sample, analytical method, and data analysis. Separation of the management of metadata from that of data and permission to attach related information to the metadata provide advantages for submitters, readers, and database developers. The metadata are enriched with information such as links to comparable data, thereby functioning as a hub of related data resources. They also enhance not only readers' understanding and use of data, but also submitters' motivation to publish the data. The metadata are computationally shared among other systems via APIs, which facilitates the construction of novel databases by database developers. A permission system that allows publication of immature metadata and feedback from readers also helps submitters to improve their metadata. Hence, this aspect of Metabolonote, as a metadata preparation tool, is complementary to high-quality and persistent data repositories such as MetaboLights. A total of 808 metadata for analyzed data obtained from 35 biological species are published currently. Metabolonote and related tools are available free of cost at http://metabolonote.kazusa.or.jp/.

  8. 77 FR 41811 - In the Matter of Tennessee Valley Authority Watts Bar Nuclear Plant EA-12-021; Confirmatory Order...

    Science.gov (United States)

    2012-07-16

    ... ADR session mediated by a professional mediator, arranged through Cornell University's Institute on... representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is... for accessing the E-Submittal server are detailed in NRC's ``Guidance for Electronic Submission...

  9. 17 CFR 145.9 - Petition for confidential treatment of information submitted to the Commission.

    Science.gov (United States)

    2010-04-01

    ... may summarily reject the submitter's request for confidential treatment with leave to the submitter to... treatment of information submitted to the Commission. 145.9 Section 145.9 Commodity and Securities Exchanges... treatment of information submitted to the Commission. (a) Purpose. This section provides a procedure by...

  10. 78 FR 66965 - In the Matter of Exelon Generation Company, LLC; Dresden Nuclear Power Station Confirmatory Order...

    Science.gov (United States)

    2013-11-07

    ... session mediated by a professional mediator, arranged through Cornell University's Institute on Conflict... representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is... for accessing the E-Submittal server are detailed in the NRC's ``Guidance for Electronic Submission...

  11. 77 FR 6598 - In the Matter of Entergy Nuclear Operations, Inc., Palisades Nuclear Plant, 27780 Blue Star...

    Science.gov (United States)

    2012-02-08

    ... Entergy met in an ADR session mediated by a professional mediator, arranged through Cornell University's... digitally sign documents and access the E-Submittal server for any proceeding in which it is participating... the E-Submittal server are detailed in NRC's ``Guidance for Electronic Submission,'' which is [[Page...

  12. 40 CFR 82.180 - Agency review of SNAP submissions.

    Science.gov (United States)

    2010-07-01

    ... available during the review period that may influence the Agency's evaluation of a substitute, the submitter... decision. Sale or manufacture of new substitutes may commence after the initial 90-day notification period... communicate that decision or the need for additional data to the submitter. Sale or manufacture of existing...

  13. Technical-evaluation report on the proposed technical-specification changes for the inservice surveillance of safety-related hydraulic and mechanical snubbers at the Millstone Nuclear Power Station, Unit 2 (Docket No. 50-336)

    International Nuclear Information System (INIS)

    Selan, J.C.

    1983-01-01

    This report documents the technical evaluation of the proposed Technical Specification changes to Limiting Conditions for Operation, Surveillance Requirements and Bases for safety-related hydraulic and mechanical snubbers at the Millstone Nuclear Power Station, Unit 2. The evaluation is to determine whether the proposed Technical Specifications are in conformance with the model Standard Technical Specification set forth by the NRC. A check list, Appendix A of this report, compares the licensee's submittal with the NRC requirements and includes Proposed Resolution of the Deviations

  14. 12 CFR 1402.15 - Business information.

    Science.gov (United States)

    2010-01-01

    ... Information Officer shall, to the extent permitted by law, provide a business submitter with prompt written... Insurance Corporation shall, to the extent permitted by law, afford a business submitter a reasonable period... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Business information. 1402.15 Section 1402.15...

  15. 40 CFR 152.99 - Petitions to cancel registration.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Petitions to cancel registration. 152... Submitters' Rights § 152.99 Petitions to cancel registration. An original data submitter may petition the Agency to deny or cancel the registration of a product in accordance with this section if he has...

  16. submitter Dynamical Models of a Wire Scanner

    CERN Document Server

    Barjau, Ana; Dehning, Bernd

    2016-01-01

    The accuracy of the beam profile measurements achievable by the current wire scanners at CERN is limited by the vibrations of their mechanical parts. In particular, the vibrations of the carbon wire represent the major source of wire position uncertainty which limits the beam profile measurement accuracy. In the coming years, due to the Large Hadron Collider (LHC) luminosity upgrade, a wire traveling speed up to 20 $m s^{−1}$ and a position measurement accuracy of the order of 1 μm will be required. A new wire scanner design based on the understanding of the wire vibration origin is therefore needed. We present the models developed to understand the main causes of the wire vibrations observed in an existing wire scanner. The development and tuning of those models are based on measurements and tests performed on that CERN proton synchrotron (PS) scanner. The final model for the (wire + fork) system has six degrees-of-freedom (DOF). The wire equations contain three different excitation terms: inertia...

  17. Technical-evaluation report on the proposed technical-specification changes for the inservice surveillance of safety-related hydraulic and mechanical snubbers at the James A. Fitzpatrick Nuclear Power Plant (Docket No. 50-333)

    International Nuclear Information System (INIS)

    Selan, J.C.

    1983-01-01

    This report documents the technical evaluation of the proposed Technical Specification changes to Limiting Conditions for Operation, Surveillance Requirements and Bases for safety-related hydraulic and mechanical snubbers at the James A. FitzPatrick Nuclear Power Plant. The evaluation is to determine whether the proposed Technical Specifications are in conformance with the model Standard Technical Specification set forth by the NRC. A check list, Appendix A of this report, compares the licensee's submittal with the NRC requirements and includes Proposed Resolution of the Deviations

  18. Technical-evaluation report on the proposed technical-specification changes for the inservice surveillance of safety-related hydraulic and mechanical snubbers at the Indian Point Nuclear Power Plant, Unit 3 (Docket No. 50-286)

    International Nuclear Information System (INIS)

    Selan, J.C.

    1983-01-01

    This report documents the technical evaluation of the proposed Technical Specification changes to Limiting Conditions for Operation, Surveillance Requirements and Bases for safety-related hydraulic and mechanical snubbers at the Indian Point Nuclear Power Plant, Unit 3. The evaluation is to determine whether the proposed Technical Specifications are in conformance with the model Standard Technical Specification set forth by the NRC. A check list, Appendix A of this report, compares the licensee's submittal with the NRC requirements and includes Proposed Resolution of the Deviations

  19. submitter LEP Higgs

    CERN Document Server

    Mori, T

    2001-01-01

    As the LEP experiments verified the gauge interactions more and more rigorously, searches for the Higgs boson, which forms the very basis of the gauge theories, were taking on more and more importance in LEP physics. How this last missing particle in the Standard Model may be discovered (or totally excluded) will be the key to new physics beyond the Standard Model. Here I briefly describe how the LEP experiments together have closed in on this God particle during their 11 year running.

  20. submitter LHC experiments

    CERN Document Server

    Tanaka, Shuji

    2001-01-01

    Large Hadron Collider (LHC) is under construction at the CERN Laboratory in Switzerland. Four experiments (ATLAS, CMS, LHCb, ALICE) will try to study the new physics by LHC from 2006. Its goal to explore the fundamental nature of matter and the basic forces. The PDF file of the transparency is located on http://www-atlas.kek.jp/sub/documents/lepsymp-stanaka.pdf.

  1. submitter Accelerating high-energy physics exploration with deep learning

    CERN Document Server

    Ojika, Dave; Gordon-Ross, Ann; Carnes, Andrew; Gleyzer, Sergei

    2017-01-01

    In this work, we present our approach to using deep learning for identification of rarely produced physics particles (such as the Higgs Boson) out of a majority of uninteresting, background or noise-dominated data. A fast and efficient system to eliminate uninteresting data would result in much less data being stored, thus significantly reducing processing time and storage requirements. In this paper, we present a generalized preliminary version of our approach to motivate research interest in advancing the state-of-the-art in deep learning networks for other applications that can benefit from learning systems.

  2. Radioactive air emissions notice of construction 241-ER-311 catch tank

    International Nuclear Information System (INIS)

    HILL, J.S.

    1999-01-01

    The following description, attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions and Defense Waste Section as a notice of construction (NOC) in accordance with the Washington Administrative Code (WAC) 246-247, Radiation Protection - Air Emissions. The WAC 246-247-060, ''Applications, registration and licensing,'' states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of the information listed in Appendix A,'' Appendix A (WAC 246-247-110) lists the requirements that must be addressed. Additionally, the following description, attachments and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40, Code of Federal Regulations (CFR), Part 6 1, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 millirem/year total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI), and commencement is needed within a short time frame. Therefore, this application is also intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(a)(l), and it is requested that approval of this application will also constitute EPA acceptance of this 40 CFR 61.09(a)(l) notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2) will be provided later

  3. Radioactive air emissions notice of construction 241-SY-101 crust growth near term mitigation

    International Nuclear Information System (INIS)

    Homan, N.A.

    1999-01-01

    The following description and any attachments and references are provided to the Washington State Department of Health, Division of Radiation Protection, Air Emissions and Defense Waste Section as a notice of construction (NOC) in accordance with the Washington Administrative Code (WAC) 246-247, Radiation Protection - Air Emissions. The WAC 246-247-060, ''Applications, registration and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of the information listed in Appendix A.'' Appendix A (WAC 246-247-110), lists the requirements that must be addressed. Additionally, the following description, attachments and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 mrem/year total effective dose equivalent to the hypothetical offsite maximally exposed individual, and commencement is needed within a short time frame. Therefore, this application is also intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(a)(1), and it is requested that approval of this application will also constitute EPA acceptance of this 40 CFR 61.09(a)(1) notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2), will be provided at a later date

  4. 75 FR 68297 - Pesticides; Satisfaction of Data Requirements; Procedures To Ensure Protection of Data Submitters...

    Science.gov (United States)

    2010-11-05

    ... nontarget organisms and endangered species that include: Humans; wildlife; plants; and surface water or..., and the FIFRA Scientific Advisory Panel (SAP). The SAP and the Secretary of Agriculture waived review... total time, effort, or financial resources expended by persons to generate, maintain, retain, or...

  5. submitter Experimental temperature measurements for the energy amplifier test

    CERN Document Server

    Calero, J; Gallego, E; Gálvez, J; García Tabares, L; González, E; Jaren, J; López, C; Lorente, A; Martínez Val, J M; Oropesa, J; Rubbia, C; Rubio, J A; Saldana, F; Tamarit, J; Vieira, S

    1996-01-01

    A uranium thermometer has been designed and built in order to make local power measurements in the First Energy Amplifier Test (FEAT). Due to the experimental conditions power measurements of tens to hundreds of nW were required, implying a sensitivity in the temperature change measurements of the order of 1 mK. A uranium thermometer accurate enough to match that sensitivity has been built. The thermometer is able to determine the absolute energetic gain obtained in a tiny subcritical uranium assembly exposed to a proton beam of kinetic energies between 600 MeV and 2.75 GeV. In addition, the thermometer measurements have provided information about the spatial power distribution and the shape of the neutron spallation cascade.

  6. 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  7. 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base.

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-01-01

    The 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  8. Lawrence Livermore National Laboratory Environmental Report 2015

    International Nuclear Information System (INIS)

    Rosene, C. A.; Jones, H. E.

    2016-01-01

    The purposes of the Lawrence Livermore National Laboratory Environmental Report 2015 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites-the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, ''Environment, Safety and Health Reporting,'' and DOE Order 458.1, ''Radiation Protection of the Public and Environment.''

  9. Well Construction Details, Groundwater Elevations, and Figures for the Tijeras Arroyo Groundwater Area at Sandia National Laboratories, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Copland, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This Sandia National Laboratories / New Mexico (SNL/NM) submittal contains groundwater information that the United States Geological Survey (USGS) has requested. The USGS will use the information to assist Kirtland Air Force Base (KAFB) in its ongoing groundwater studies. The information in this submittal contains well-construction details and groundwater-elevation data for monitoring wells that SNL/NM has installed. Relevant well-construction data from other government agencies are also summarized. This submittal contains four data tables and three figures. Information in the tables has been used by SNL/NM to prepare groundwater compliance reports that have previously incorporated the three figures. The figures depict the potentiometric surface for the Perched Groundwater System, the potentiometric surface for the Regional Aquifer, and a Conceptual Site Model for the vicinity of Tijeras Arroyo in the northern portion of KAFB.

  10. Radioactive Air Emissions Notice of Construction for the Magnesium Hydroxide Precipitation Process at the Plutonium Finishing Plant (PFP)

    International Nuclear Information System (INIS)

    JANSKY, M.T.

    1999-01-01

    The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions and Defense Waste (WAC) 246-247, Radiation Protection-Air Emissions. The WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A.'' Appendix A (WAC 246-247-1 10) lists the requirements that must be addressed. Additionally, the following description, attachments and references are provided to the US Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40, Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide greater than 0.1 millirem per year total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI), and commencement is needed within a short time. Therefore, this application also is intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(a)(1), and it is requested that approval of this application also will constitute EPA acceptance of this initial startup notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2) will be provided at a later date. This NOC covers the activities associated with the Construction and operation activities involving the magnesium hydroxide precipitation process of plutonium solutions within the Plutonium Finishing Plant (PFP)

  11. Notice of construction work in tank farm waste transfer pit 244-TX double contained receiver-tank

    International Nuclear Information System (INIS)

    HILL, J.S.

    1999-01-01

    The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions and Defense Waste Section as a notice of construction (NOC) in accordance with Washington Administrative Code (WAC) 246-247, Radiation Protection - Air Emissions. WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A,'' Appendix A (WAC 246-247-1 10) lists the requirements that must be addressed. Additionally, the following description, attachments, and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 millired year total effective dose equivalent to the hypothetical offsite maximally exposed individual, and commencement is needed within a short time. Therefore, this application also is intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(a)(1), and it is requested that approval of this application also will constitute EPA acceptance of this initial startup notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2), will be provided later. The activities described in this NOC are estimated to provide a potential offsite (unabated) total effective dose equivalent (TEDE) to the hypothetical maximally exposed individual (MEI) of 2.36 E-02 millirem per year

  12. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    Valero, O.J.

    1998-01-01

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding

  13. submitter The TORCH detector R&D: Status and perspectives

    CERN Document Server

    Gys, T; Castillo García, L; Cussans, D; Föhl, K; Forty, R; Frei, C; Gao, R; Harnew, N; Piedigrossi, D; Rademacker, J; Ros García, A; van Dijk, M

    2017-01-01

    TORCH (Timing Of internally Reflected CHerenkov photons) is a time-of-flight detector for particle identification at low momentum. It has been originally proposed for the LHCb experiment upgrade. TORCH is using plates of quartz radiator in a modular design. A fraction of the Cherenkov photons produced by charged particles passing through this radiator propagate by total internal reflection, they emerge at the edges and are subsequently focused onto fast, position-sensitive single-photon detectors. The recorded position and arrival time of the photons are used to precisely reconstruct their trajectory and propagation time in the quartz. The on-going R&D; programme aims at demonstrating the TORCH basic concept through the realization of a full detector module and has been organized on the following main development lines: micro-channel plate photon detectors featuring the required granularity and lifetime, dedicated fast front-end electronics preserving the picosecond timing information provided by single p...

  14. DOE/RL Hanford Site Air Operating Permit Annual Compliance Certification Report for the Period July 2 2001 through December 31 2001 [SEC 1 and 2

    International Nuclear Information System (INIS)

    GREEN, W.E.

    2002-01-01

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. The AOP, Section 4.3.4, ''Annual Compliance Certification'', requires submittal of an annual compliance certification report no later than 12 months following the effective date of the permit. This report is to be certified for truth, accuracy, and completeness by a Responsible Official. This first annual compliance certification report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the annual compliance certification report will contain information for the period from January 1 through December 31, as required by the AOP Section 4.3, ''Submittals''. Copies of the annual compliance certification reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, Section 4.3.3, ''Annual Compliance Certification'', requires the following content for the annual compliance certification report: (1) The identification of each term or condition of the permit that is the basis of the certification; (2) The compliance status; (3) Whether compliance was continuous or intermittent; (4) The method(s) used to determine the compliance status of the source over the reporting period consistent with Washington Administrative Code (WAC) 173401 -61 5(3)(a); and (5) Such other facts as Ecology, WDOH, or BCAA might be required to determine the compliance status of the source. According to WAC 173-401-630(5), no certification is required for insignificant emission units. The specific terms and conditions for this annual compliance certification report consist of all emission point specific terms and conditions contained in the AOP Attachment 1 and Attachment 2 tables, plus Attachment 3 for asbestos and open burning

  15. Lawrence Livermore National Laboratory Environmental Report 2014

    Energy Technology Data Exchange (ETDEWEB)

    Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Buscheck, W. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Byrne, J. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Cerruti, S. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fratanduono, M. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); MacQueen, D. H. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Montemayor, W. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ottaway, H. L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Paterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Swanson, K. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Terrill, A. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, A. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wilson, K. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Woollett, J. S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-09-29

    The purposes of the Lawrence Livermore National Laboratory Environmental Report 2014 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites—the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, “Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.”

  16. Lawrence Livermore National Laboratory Environmental Report 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-22

    The purposes of the Lawrence Livermore National Laboratory Environmental Report 2015 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites—the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, “Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.”

  17. DOE responses to the State of New Mexico's comments on ''summary of the results of the evaluation of the WIPP site and preliminary design validation program'' (WIPP-DOE-161)

    International Nuclear Information System (INIS)

    1983-06-01

    During the 60-day period provided for comments on the ''Summary of the Results of the Evaluation of the WIPP Site and Preliminary Design Validation Program'' (WIPP-DOE-161), written submittals and hearing testimony from about 133 individuals, 7 citizens groups and 6 state agencies were received by the Department of Energy (DOE). Approximately 25% of the public comment submittals were positive statements supporting the WIPP, with the remaining 75% reflecting concern with one or more aspects of the project. A portion of the state's comment package (submitted by the Governor of New Mexico) contained concerns relevant to WIPP which were unrelated to site suitability. Supportive comments formed the majority of the submittals from the New Mexico Environmental Evaluation Group (EEG) which ''...is charged with the responsibility of evaluating the suitability of the site for carrying out the mission of WIPP by analyzing all the reports and other information which form the background to the DOE evaluation of the site''

  18. submitter LEP precision results

    CERN Document Server

    Kawamoto, T

    2001-01-01

    Precision measurements at LEP are reviewed, with main focus on the electroweak measurements and tests of the Standard Model. Constraints placed by the LEP measurements on possible new physics are also discussed.

  19. submitter LEP W measurements

    CERN Document Server

    Saeki, Takayuki

    2001-01-01

    of pair-production of W bosons, and LEP2 experiments started. ALEPH, DELPHI, L3, and OPAL experiments observed the pair-production of W bosons for the first time in $e^{+}e^{-}$ collisions. Since then, the four experiments had been collecting data successfully at the energies of 161 - 209 GeV, and the data acquisition of LEP experiments was finished on 2nd November 2001. The total integrated luminosities amounted to about 710 pb$^{-1}$ per each experiment and about 46 k W-pair events were produced in total. In this article, the results on W physics in LEP2 are presented, which cover the total cross section of the W boson pair-production, the W decay branching fractions, the triple gauge-boson couplings and the mass of the W boson. All the results are consistent with the Standard Model expectations within the measurement errors.

  20. submitter Searches at LEP

    CERN Document Server

    Kawagoe, Kiyotomo

    2001-01-01

    Searches for new particles and new physics were extensively performed at LEP. Although no evidence for new particle/physics was discovered, the null results set very stringent limits to theories beyond the standard model. In this paper, searches at LEP and anomalies observed in the searches are presented. Future prospect of searches at the new energy frontier machines is also discussed.

  1. InterCatch - a tool for fish stock assessment, status and methods

    DEFF Research Database (Denmark)

    Kjems-Nielsen, Henrik; Larsen, Lena Inger; Zarecki, Maria

    2006-01-01

    InterCatch is a web-based system for handling fish stock assessment data focusing on documenting characteristics of the catches. These national fish stock data are uploaded to InterCatch by national data submitters. After all data are uploaded the stock coordinators (working for the fish stock as...... assessment group) can then check and set up allocation schemes for unsampled catches. After applying the best allocation scheme to the unsampled catches, the catch data are aggregated as required and exported for analysis, e.g. XSA or ICA....

  2. Monitored retrievable storage program. Status and plans for meeting NWPA requirements

    International Nuclear Information System (INIS)

    Hall, R.J.; Fletcher, J.F.

    1983-12-01

    Accomplishments of the Monitored Retrieval Storage (MRS) Program since passage of the Nuclear Waste Policy Act of 1982 (NWPA) are as follows: (1) R and D needs report was submitted; (2) conceptual design analysis of 8 MRS concepts was performed; (3) selection of two MRS concepts (primary, alternative) are underway; (4) Parson/Westinghouse/Golder were selected as architect-engineer; (5) functional design criteria were established; (6) reports to accompany proposal were defined; and (7) evaluations of mission, cost-effectiveness, deployment time were performed. Future work, plans and schedule include completion of facility advanced conceptual design and accompanying design reports in early 1985, for submittal with proposal in June. Designs are being prepared for the primary concept, and in less detail, for the alternate. Three separate site locations will be assumed for each concept. A siting plan, to accompany the proposal, will also be completed in early 1985, as will an environmental assessment now under preparation. It is planned that the proposal be accompanied by several reports augmenting the planning base for post-proposal actions, to be activated at the time MRS deployment is authorized by Congress. 9 figures

  3. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  4. 46 CFR 170.095 - Data submittal for a vessel equipped to lift.

    Science.gov (United States)

    2010-10-01

    ... vessel is engaged in lifting and is required to comply with subpart B of part 173 of this chapter: (a) A graph of maximum hook load versus maximum crane radius. (b) A table of crane radius versus the maximum... transverse moments at which the crane is to operate. ...

  5. Remedial action and waste disposal project: 100-B/C remedial action readiness report

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-07-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the 100-B/C source sites remediation. The 100-B/C Area is located at the Hanford Site in Richland, Washington. The evaluation was conducted at the conclusion of a series of readiness activities that began in May 1996. These activities included confirming the completion of project specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, approval of subcontractor submittals, and mobilization and construction of site support systems

  6. Third Semiannual Report to the Congress by the United States Atomic Energy Commission, February 2, 1948

    Energy Technology Data Exchange (ETDEWEB)

    Lilienthal, David E.; Bacher, Robert F.; Pike, Sumner T.; Strauss, Lewis L.; Waymack, William W.

    1948-02-02

    The document includes the letter of submittal and the third semiannual report. These reports are called for pursuant to Section 17 of the Atomic Energy Act of 1946. The letter of submittal was titled ''Letter from the Chairman and Members of the United States Atomic Energy Commission transmitting pursuant to law the third semiannual report of the Atomic Energy Commission''. It was authored by David E. Lilienthal, Chairman, and Robert F. Bacher, Sumner T. Pike, Lewis L. Strauss, and William W. Waymack of the AEC.

  7. submitter Performance studies of CMS workflows using Big Data technologies

    CERN Document Server

    Ambroz, Luca; Grandi, Claudio

    At the Large Hadron Collider (LHC), more than 30 petabytes of data are produced from particle collisions every year of data taking. The data processing requires large volumes of simulated events through Monte Carlo techniques. Furthermore, physics analysis implies daily access to derived data formats by hundreds of users. The Worldwide LHC Computing Grid (WLCG) - an international collaboration involving personnel and computing centers worldwide - is successfully coping with these challenges, enabling the LHC physics program. With the continuation of LHC data taking and the approval of ambitious projects such as the High-Luminosity LHC, such challenges will reach the edge of current computing capacity and performance. One of the keys to success in the next decades - also under severe financial resource constraints - is to optimize the efficiency in exploiting the computing resources. This thesis focuses on performance studies of CMS workflows, namely centrallyscheduled production activities and unpredictable d...

  8. Radioactive Air Emission Notice of Construction for (NOC) Plutonium Finishing Plant (PFP) Project W-460 Plutonium Stabilization and Handling

    International Nuclear Information System (INIS)

    JANSKY, M.T.

    2000-01-01

    The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions and Defense Waste Section as a notice of construction (NOC) in accordance with Washington Administrative Code (WAC) 246-247, Radiation Protection-Air Emissions. The WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A,'' Appendix A (WAC 246-247-1 IO) lists the requirements that must be addressed. Additionally, the following description, attachments, and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide greater than 0.1 millirem year total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI) and commencement is needed within a short time. Therefore, this application also is intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(a)(1), and it is requested that approval of this application also constitutes EPA acceptance of this initial startup notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2), will be provided later. This NOC covers the activities associated with the construction and operation activities involving stabilization and/or repackaging of plutonium in the 2736-ZB Building. An operations support trailer will be installed in the proximity of the 2736-ZB Building. A new

  9. Registration for the Hanford Site: Sources of radioactive emissions

    International Nuclear Information System (INIS)

    Silvia, M.J.

    1993-04-01

    This Registration Application serves to renew the registration for all Hanford Site sources of radioactive air emissions routinely reported to the State of Washington Department of Health (DOH). The current registration expires on August 15, 1993. The Application is submitted pursuant to the Washington Administrative Code (WAC) Chapter 246--247, and is consistent with guidance provided by DOH for renewal. The Application subdivides the Hanford Site into six major production, processing or research areas. Those six areas are in the 100 Area, 200 East Area, 200 West Area, 300 Area, 400 Area, and 600 Area. Each major group of point sources within the six areas listed above is represented by a Source Registration for Radioactive Air Emissions form. Annual emissions. for the sources are listed in the ''Radionuclide Air Emissions Report for the Hanford Site,'' published annually. It is a requirement that the following Statement of Compliance be provided: ''The radioactive air emissions from the above sources do meet the emissions standards contained in Chapter 173-480-040 WAC, Ambient Air Quality Standards and Emissions Limits for Radionuclides. As the Statement of Compliance pertains to this submittal, the phrase ''above sources'' is to be understood as meaning the combined air emissions from all sources registered by this submittal

  10. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document

  11. 40 CFR 600.313-01 - Timetable for data and information submittal and review.

    Science.gov (United States)

    2010-07-01

    ... constraints (except for manufacturers designated under § 600.312(a)(4) who shall submit the information no... running changes (as required under § 600.314(b)), the submission must be made at least five working days before the date of implementation of the running change. (b) A manufacturer may not proceed with any...

  12. 40 CFR 600.313-86 - Timetable for data and information submittal and review.

    Science.gov (United States)

    2010-07-01

    ... constraints (except for manufacturers designated under § 600.312(a)(4) who shall submit the information no... running changes (as required under § 600.314(b)), the submission must be made at least five working days before the date of implementation of the running change. (b) A manufacturer may not proceed with any...

  13. DOE/RL Hanford Site Air Operating Permit Annual Compliance Certification Report for the Period July 2 2001 through December 31 2001 [SEC 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    GREEN, W.E.

    2002-05-22

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. The AOP, Section 4.3.4, ''Annual Compliance Certification'', requires submittal of an annual compliance certification report no later than 12 months following the effective date of the permit. This report is to be certified for truth, accuracy, and completeness by a Responsible Official. This first annual compliance certification report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the annual compliance certification report will contain information for the period from January 1 through December 31, as required by the AOP Section 4.3, ''Submittals''. Copies of the annual compliance certification reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, Section 4.3.3, ''Annual Compliance Certification'', requires the following content for the annual compliance certification report: (1) The identification of each term or condition of the permit that is the basis of the certification; (2) The compliance status; (3) Whether compliance was continuous or intermittent; (4) The method(s) used to determine the compliance status of the source over the reporting period consistent with Washington Administrative Code (WAC) 173401 -61 5(3)(a); and (5) Such other facts as Ecology, WDOH, or BCAA might be required to determine the compliance status of the source. According to WAC 173-401-630(5), no certification is required for insignificant emission units. The specific terms and conditions for this annual compliance certification report consist of all emission point specific terms and conditions contained in the AOP Attachment 1 and Attachment 2 tables, plus Attachment 3 for

  14. Closure report for N Reactor

    International Nuclear Information System (INIS)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule

  15. SEM evaluation of metallization on semiconductors. [Scanning Electron Microscope

    Science.gov (United States)

    Fresh, D. L.; Adolphsen, J. W.

    1974-01-01

    A test method for the evaluation of metallization on semiconductors is presented and discussed. The method has been prepared in MIL-STD format for submittal as a proposed addition to MIL-STD-883. It is applicable to discrete devices and to integrated circuits and specifically addresses batch-process oriented defects. Quantitative accept/reject criteria are given for contact windows, other oxide steps, and general interconnecting metallization. Figures are provided that illustrate typical types of defects. Apparatus specifications, sampling plans, and specimen preparation and examination requirements are described. Procedures for glassivated devices and for multi-metal interconnection systems are included.

  16. Closure report for N Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This report has been prepared to satisfy Section 3156(b) of Public Law 101-189 (Reports in Connection with Permanent Closures of Department of Energy Defense Nuclear Facilities), which requires submittal of a Closure Report to Congress by the Secretary of Energy upon the permanent cessation of production operations at a US Department of Energy (DOE) defense nuclear facility (Watkins 1991). This closure report provides: (1) A complete survey of the environmental problems at the facility; (2) Budget quality data indicating the cost of environmental restoration and other remediation and cleanup efforts at the facility; (3) A proposed cleanup schedule.

  17. GrabBlur--a framework to facilitate the secure exchange of whole-exome and -genome SNV data using VCF files.

    Science.gov (United States)

    Stade, Björn; Seelow, Dominik; Thomsen, Ingo; Krawczak, Michael; Franke, Andre

    2014-01-01

    Next Generation Sequencing (NGS) of whole exomes or genomes is increasingly being used in human genetic research and diagnostics. Sharing NGS data with third parties can help physicians and researchers to identify causative or predisposing mutations for a specific sample of interest more efficiently. In many cases, however, the exchange of such data may collide with data privacy regulations. GrabBlur is a newly developed tool to aggregate and share NGS-derived single nucleotide variant (SNV) data in a public database, keeping individual samples unidentifiable. In contrast to other currently existing SNV databases, GrabBlur includes phenotypic information and contact details of the submitter of a given database entry. By means of GrabBlur human geneticists can securely and easily share SNV data from resequencing projects. GrabBlur can ease the interpretation of SNV data by offering basic annotations, genotype frequencies and in particular phenotypic information - given that this information was shared - for the SNV of interest. GrabBlur facilitates the combination of phenotypic and NGS data (VCF files) via a local interface or command line operations. Data submissions may include HPO (Human Phenotype Ontology) terms, other trait descriptions, NGS technology information and the identity of the submitter. Most of this information is optional and its provision at the discretion of the submitter. Upon initial intake, GrabBlur merges and aggregates all sample-specific data. If a certain SNV is rare, the sample-specific information is replaced with the submitter identity. Generally, all data in GrabBlur are highly aggregated so that they can be shared with others while ensuring maximum privacy. Thus, it is impossible to reconstruct complete exomes or genomes from the database or to re-identify single individuals. After the individual information has been sufficiently "blurred", the data can be uploaded into a publicly accessible domain where aggregated genotypes are

  18. Design and Data Management System

    Science.gov (United States)

    Messer, Elizabeth; Messer, Brad; Carter, Judy; Singletary, Todd; Albasini, Colby; Smith, Tammy

    2007-01-01

    The Design and Data Management System (DDMS) was developed to automate the NASA Engineering Order (EO) and Engineering Change Request (ECR) processes at the Propulsion Test Facilities at Stennis Space Center for efficient and effective Configuration Management (CM). Prior to the development of DDMS, the CM system was a manual, paper-based system that required an EO or ECR submitter to walk the changes through the acceptance process to obtain necessary approval signatures. This approval process could take up to two weeks, and was subject to a variety of human errors. The process also requires that the CM office make copies and distribute them to the Configuration Control Board members for review prior to meetings. At any point, there was a potential for an error or loss of the change records, meaning the configuration of record was not accurate. The new Web-based DDMS eliminates unnecessary copies, reduces the time needed to distribute the paperwork, reduces time to gain the necessary signatures, and prevents the variety of errors inherent in the previous manual system. After implementation of the DDMS, all EOs and ECRs can be automatically checked prior to submittal to ensure that the documentation is complete and accurate. Much of the configuration information can be documented in the DDMS through pull-down forms to ensure consistent entries by the engineers and technicians in the field. The software also can electronically route the documents through the signature process to obtain the necessary approvals needed for work authorization. The workflow of the system allows for backups and timestamps that determine the correct routing and completion of all required authorizations in a more timely manner, as well as assuring the quality and accuracy of the configuration documents.

  19. submitter Performance simulation of BaBar DIRC bar boxes in TORCH

    CERN Document Server

    Föhl, K; Castillo García, L; Cussans, D; Forty, R; Frei, C; Gao, R; Gys, T; Harnew, N; Piedigrossi, D; Rademacker, J; Ros García, A; van Dijk, M

    2017-01-01

    TORCH is a large-area precision time-of-flight detector based on the DIRC principle. The DIRC bar boxes of the BaBar experiment at SLAC could possibly be reused to form a part of the TORCH detector time-of-flight wall area, proposed to provide positive particle identification of low momentum kaons in the LHCb experiment at CERN. For a potential integration of BaBar bar boxes into TORCH, new imaging readout optics are required. From the several designs of readout optics that have been considered, two are used in this paper to study the effect of BaBar bar optical imperfections on the detector reconstruction performance. The kaon-pion separation powers obtained from analysing simulated photon hit patterns show the performance reduction for a BaBar bar of non-square geometry compared to a perfectly rectangular cross section.

  20. Technical Review Report for the Model 9977 Safety Analysis Report for Packaging Addendum 1 Justification for DNDO Contents

    Energy Technology Data Exchange (ETDEWEB)

    West, M H

    2008-12-17

    The Model 9977 Package is currently certified for Content Envelope C.1, {sup 238}Pu Heat Sources, either in Radioisotope Thermoelectric Generator (RTG), or in Food-Pack Can configurations, under Certificate of Compliance (CoC) Certificate Number 9977 and Package Identification Number USA/9977/B(M)F-96 (DOE). Addendum 1, Justification for DNDO Contents,--the Submittal--supplements Revision 2 of the Safety Analysis Report for Packaging for the Model 9977 Package. The Submittal adds five new contents to the Model 9977 Package, Content Envelopes, AC.1 through AC.5. The Content Envelopes are neptunium metal, the beryllium-reflected plutonium ball (BeRP Ball), plutonium/uranium metal, plutonium/uranium metal with enhanced wt% {sup 240}Pu (to 50 wt%), and uranium metal. The last three Content Envelopes are stabilized to DOE-STD-3013. These Content Envelopes will be shipped to the Device Assembly Facility (DAF) at the Nevada Test Site (NTS), where they will reside, and, hence, to off-site locations in support of the Department of Homeland Security (DHS) Domestic Nuclear Detection Office (DNDO). The new certificate will apply to a limited number of Model 9977 Packages. At the same time, the Submittal requests an extension of the periodic maintenance requirements from one (1) year to up to five (5) years using Radio-Frequency Identification (RFID) temperature-monitoring systems to measure the ambient storage temperature in order to ensure that the temperature of the Viton{reg_sign} O-rings for the 6-inch Containment Vessel (6CV) remain less than 200 F. The RFIDs have been developed by Argonne National Laboratory. An on-going surveillance program at the K-Area Materials Storage (KAMS) facility at the Savannah River Site, and an on-going examination of Viton{reg_sign} O-rings from mock Primary Containment Vessels (PCVs) at Savannah River National Laboratory (SRNL) provide the technical justification for the extension of the periodic maintenance interval. Where extended

  1. Individual plant examination: Submittal guidance

    International Nuclear Information System (INIS)

    1989-08-01

    Based on a Policy Statement on Severe Accidents Regarding Future Designs and Existing Plants, the performance of a plant examination is requested from the licensee of each nuclear power plant. The plant examination looks for vulnerabilities to severe accidents and cost-effective safety improvements that reduce or eliminate the important vulnerabilities. This document delineates guidance for reporting the results of that plant examination. 38 refs., 2 tabs

  2. Idaho National Laboratory PCB Annual Document Log and Annual Records Report for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    no name on report

    2014-06-01

    The requirements for the reporting of polychlorinated biphenyl (PCB)-related activities are found in 40 Code of Federal Regulations (CFR) 761 Subpart J, "General Records and Reports." The PCB Annual Document Log is a detailed record of the PCB waste handling activities at the facility. The facility must prepare it each year by July 1 and maintain it at the facility for at least 3 years after the facility ceases using or storing PCBs and PCB items. While submittal of the PCB Annual Document Log to the U.S. Environmental Protection Agency (EPA) is not required by regulation, EPA has verbally requested in telephone conversations that this report be submitted to them on an annual basis. The Annual Document Log section of this report meets the requirements of 40 CFR 761.180(a)(2), as applicable, while the Annual Records section meets the requirement of 40 CFR 761.180(a)(1).

  3. submitter Observation of viscosity transition in α-pinene secondary organic aerosol

    CERN Document Server

    Järvinen, Emma; Nichman, Leonid; Kristensen, Thomas B; Fuchs, Claudia; Hoyle, Christopher R; Höppel, Niko; Corbin, Joel C; Craven, Jill; Duplissy, Jonathan; Ehrhart, Sebastian; El Haddad, Imad; Frege, Carla; Gordon, Hamish; Jokinen, Tuija; Kallinger, Peter; Kirkby, Jasper; Kiselev, Alexei; Naumann, Karl-Heinz; Petäjä, Tuukka; Pinterich, Tamara; Prevot, Andre S H; Saathoff, Harald; Schiebel, Thea; Sengupta, Kamalika; Simon, Mario; Slowik, Jay G; Tröstl, Jasmin; Virtanen, Annele; Vochezer, Paul; Vogt, Steffen; Wagner, Andrea C; Wagner, Robert; Williamson, Christina; Winkler, Paul M; Yan, Chao; Baltensperger, Urs; Donahue, Neil M; Flagan, Rick C; Gallagher, Martin; Hansel, Armin; Kulmala, Markku; Stratmann, Frank; Worsnop, Douglas R; Möhler, Ottmar; Leisner, Thomas; Schnaiter, Martin

    2016-01-01

    Under certain conditions, secondary organic aerosol (SOA) particles can exist in the atmosphere in an amorphous solid or semi-solid state. To determine their relevance to processes such as ice nucleation or chemistry occurring within particles requires knowledge of the temperature and relative humidity (RH) range for SOA to exist in these states. In the Cosmics Leaving Outdoor Droplets (CLOUD) experiment at The European Organisation for Nuclear Research (CERN), we deployed a new in situ optical method to detect the viscous state of α-pinene SOA particles and measured their transition from the amorphous highly viscous state to states of lower viscosity. The method is based on the depolarising properties of laboratory-produced non-spherical SOA particles and their transformation to non-depolarising spherical particles at relative humidities near the deliquescence point. We found that particles formed and grown in the chamber developed an asymmetric shape through coagulation. A transition to a spherical shape w...

  4. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, draft report for comment. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J. [Pacific Northwest Lab., Richland, WA (United States)] [and others

    1994-09-01

    On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s WNP-2, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, materials, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

  5. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, draft report for comment. Volume 2

    International Nuclear Information System (INIS)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.

    1994-09-01

    On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System's WNP-2, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, materials, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined

  6. submitter Radiation Protection Studies for CERN LINAC4/SPL Accelerator Complex

    CERN Document Server

    Mauro, Egidio; Silari, Marco

    2009-01-01

    CERN is presently designing a new chain of accelerators to replace the present Proton Synchrotron (PS) complex: a 160 MeV room-temperature H$^-$ linac (Linac4) to replace the present 50 MeV proton linac injector, a 3.5 GeV Superconducting Proton Linac (SPL) to replace the 1.4 GeV PS booster (PSB) and a 50 GeV synchrotron (named PS2) to replace the 26 GeV PS. Linac4 has been funded and the civil engineering work started in October 2008, whilst the SPL is in an advanced stage of design. Beyond injecting into the future 50 GeV PS, the ultimate goal of the SPL is to generate a 4 MW beam for the production of intense neutrino beams. The radiation protection design is driven by the latter requirement. This thesis summarizes the radiation protection studies conducted for Linac4. FLUKA Monte Carlo simulations, complemented by analytical estimates, were performed 1) to evaluate the propagation of neutrons through the waveguide, ventilation and cable ducts placed along the accelerator, 2) to estimate the radiological i...

  7. Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300

    International Nuclear Information System (INIS)

    MacDonnell, B.A.; Obenauf, K.S.

    1996-08-01

    The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline

  8. The IPE Database: providing information on plant design, core damage frequency and containment performance

    International Nuclear Information System (INIS)

    Lehner, J.R.; Lin, C.C.; Pratt, W.T.; Su, T.; Danziger, L.

    1996-01-01

    A database, called the IPE Database has been developed that stores data obtained from the Individual Plant Examinations (IPEs) which licensees of nuclear power plants have conducted in response to the Nuclear Regulatory Commission's (NRC) Generic Letter GL88-20. The IPE Database is a collection of linked files which store information about plant design, core damage frequency (CDF), and containment performance in a uniform, structured way. The information contained in the various files is based on data contained in the IPE submittals. The information extracted from the submittals and entered into the IPE Database can be manipulated so that queries regarding individual or groups of plants can be answered using the IPE Database

  9. Notice of Construction for Tank Waste Remediation System Vadose Zone Characterization

    International Nuclear Information System (INIS)

    HILL, J.S.

    2000-01-01

    The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions and Defense Waste Section as a notice of construction (NOC) in accordance with Washington Administrative Code (WAC) 246-247, Radiation Protection--Air Emissions. The WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A,'' Appendix A (WAC 246-247-1 10) lists the requirements that must be addressed. The original NOC was submitted in May of 1999 as DOE/TU-99-34. Additionally, the following description, attachments and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 millirem/year total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI), and commencement is needed within a short time frame. Therefore, this application is also intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(axl), and it is requested that approval of this application will also constitute EPA acceptance of this initial start-up notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2) will be provided at a later date. This NOC covers the activities associated with vadose zone characterization within the Single-Shell Tank Farms located in the 200-East and 200-West Areas of the Hanford Site. Vadose zone

  10. 40 CFR 86.091-7 - Maintenance of records; submittal of information; right of entry.

    Science.gov (United States)

    2010-07-01

    ..., fulfills each of the requirements of this paragraph (a)(1). (2) Individual records. (i) A brief history of... vehicle (or engine) during any time in the period covered by the history not described by an entry under... to diagnose engine or emission control system performance, giving the date and time of the test and...

  11. Safety Evaluation Report, pump and valve inservice testing program, Yankee Rowe Nuclear Power Station (Docket No. 50-29). Revision 1

    International Nuclear Information System (INIS)

    Ransom, C.B.; Rockhold, H.C.

    1985-10-01

    The staff reviewed the Yankee Rowe IST program submittal dated October 2, 1981 and evaluated the proposed tests for compliance with the requirements of the ASME Boiler and Pressure Vessel Code, Section XI, 1977 Edition, through the Summer of 1978 Addenda. Those items not in compliance were discussed in a working session with Yankee Atomic Electric Company personnel, USNRC representatives, and EG and G Idaho reviewers on June 22, 1982. The evaluations presented in this SER of the Yankee Rowe pump and valve inservice testing program and the associated relief requests are those of the NRC staff. These findings apply only to component testing

  12. Algeria schedules onshore licensing round

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Algeria's Sonatrach will conduct its first international onshore exploration licensing round in a move designed to triple drilling activity in the country. A second round will follow next April. Sonatrach plans to drill 200 wells during 1991-95, which will require the current level of 37/year to be almost trebled toward the end of the period. To this end foreign operators are being courted in an open exploration bidding round. Deadline for bid submittal in Nov. 30. Companies may enter singly or in groups to form partnerships with Sonatrach. Foreign licensees will be able to take a maximum 49% of production under Algerian law

  13. 40 CFR 60.2235 - In what form can I submit my reports?

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for... deviation reports electronically or in paper format, postmarked on or before the submittal due dates. ...

  14. 77 FR 58063 - Approval and Promulgation of Implementation Plans; Texas; Reasonably Available Control Technology...

    Science.gov (United States)

    2012-09-19

    ... (Appendix D of the submittal). 2. What is a VMEP commitment? Voluntary mobile source strategies complement... and Sec. Wastewater Separators, Unit Turnarounds. 115.131-139. Synthetic Organic Chemical...

  15. Sample Set (SE): SE17 [Metabolonote[Archive

    Lifescience Database Archive (English)

    Full Text Available Sakurai 1, Hideyuki Suzuki 1, Tatsuya Suzuki 2, Daisuke Shibata 1, 1: Kazusa DNA Research Institute, 2: Chiba Prefectural Agriculture Research Center Direct Submittion version 1 ...

  16. 75 FR 51752 - Proposed Information Collection; Comment Request; An Observer Program for Vessels in the Pacific...

    Science.gov (United States)

    2010-08-23

    ... have a choice of either electronic or paper forms. Methods of submittal include electronic (Web-based... status reports, 15 minutes; reports of observer illness, injury, harassment, intimidation, or violations...

  17. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  18. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N. [Pacific Northwest Lab., Richland, WA (United States)

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  19. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    International Nuclear Information System (INIS)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the '978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ''green field'' condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities

  20. 40 CFR 66.13 - Duties of source owner or operator upon receipt of a notice of noncompliance.

    Science.gov (United States)

    2010-07-01

    ... schedule, as provided in the Technical Support Document and Instruction Manual, and transmit that... petition shall be deemed waived. (b) Any submittal pursuant to this subsection shall specify the identity...

  1. BDS thin film damage competition

    Science.gov (United States)

    Stolz, Christopher J.; Thomas, Michael D.; Griffin, Andrew J.

    2008-10-01

    A laser damage competition was held at the 2008 Boulder Damage Symposium in order to determine the current status of thin film laser resistance within the private, academic, and government sectors. This damage competition allows a direct comparison of the current state-of-the-art of high laser resistance coatings since they are all tested using the same damage test setup and the same protocol. A normal incidence high reflector multilayer coating was selected at a wavelength of 1064 nm. The substrates were provided by the submitters. A double blind test assured sample and submitter anonymity so only a summary of the results are presented here. In addition to the laser resistance results, details of deposition processes, coating materials, and layer count will also be shared.

  2. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  3. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    International Nuclear Information System (INIS)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ''green field'' condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities

  4. Sample Set (SE): SE41 [Metabolonote[Archive

    Lifescience Database Archive (English)

    Full Text Available 1, Daisuke Shibata 1, 2, 1:Graduate School of Agriculture, Kyoto University, Japan, 2:Kazusa DNA Research Institute, Japan, 3:KAGOME CO., LTD., Japan Direct Submittion version 1 ...

  5. Annual Report on Waste Generation and Waste Minimization Progress, 1991--1992

    International Nuclear Information System (INIS)

    1994-02-01

    This report is DOE's first annual report on waste generation and waste minimization progress. Data presented in this report were collected from all DOE sites which met minimum threshold criteria established for this report. The fifty-seven site submittals contained herein represent data from over 100 reporting sites within 25 states. Radioactive, hazardous and sanitary waste quantities and the efforts to minimize these wastes are highlighted within the fifty-seven site submittals. In general, sites have made progress in moving beyond the planning phase of their waste minimization programs. This is evident by the overall 28 percent increase in the total amount of materials recycled from 1991 to 1992, as well as individual site initiatives. During 1991 and 1992, DOE generated a total of 279,000 cubic meters of radioactive waste and 243,000 metric tons of non-radioactive waste. These waste amounts include significant portions of process wastewater required to be reported to regulatory agencies in the state of Texas and the state of Tennessee. Specifically, the Pantex Plant in Texas treats an industrial wastewater that is considered by the Texas Water Commission to be a hazardous waste. In 1992, State regulated wastewater from the Pantex Plant represented 3,620 metric tons, 10 percent of the total hazardous waste generated by DOE. Similarly, mixed low-level wastewater from the TSCA Incinerator Facility at the Oak Ridge K-25 Site in Tennessee represented 55 percent of the total radioactive waste generated by DOE in 1992

  6. Annual Report on Waste Generation and Waste Minimization Progress, 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report is DOE`s first annual report on waste generation and waste minimization progress. Data presented in this report were collected from all DOE sites which met minimum threshold criteria established for this report. The fifty-seven site submittals contained herein represent data from over 100 reporting sites within 25 states. Radioactive, hazardous and sanitary waste quantities and the efforts to minimize these wastes are highlighted within the fifty-seven site submittals. In general, sites have made progress in moving beyond the planning phase of their waste minimization programs. This is evident by the overall 28 percent increase in the total amount of materials recycled from 1991 to 1992, as well as individual site initiatives. During 1991 and 1992, DOE generated a total of 279,000 cubic meters of radioactive waste and 243,000 metric tons of non-radioactive waste. These waste amounts include significant portions of process wastewater required to be reported to regulatory agencies in the state of Texas and the state of Tennessee. Specifically, the Pantex Plant in Texas treats an industrial wastewater that is considered by the Texas Water Commission to be a hazardous waste. In 1992, State regulated wastewater from the Pantex Plant represented 3,620 metric tons, 10 percent of the total hazardous waste generated by DOE. Similarly, mixed low-level wastewater from the TSCA Incinerator Facility at the Oak Ridge K-25 Site in Tennessee represented 55 percent of the total radioactive waste generated by DOE in 1992.

  7. Influence of Crack Morphology on Leak Before Break Margins

    International Nuclear Information System (INIS)

    Weilin Zang

    2007-11-01

    The purpose of the project is to evaluate the deterministic LBB-margins for different pipe systems in a Swedish PWR-plant and using different crack morphology parameters. Results: - The influence of crack morphology on Leak Before Break (LBB) margins is studied. The subject of the report is a number of LBB-submittals to SKI where deterministic LBB-margins are reported. These submittals typically uses a surface roughness of 0.0762 mm (300 microinch) and number of turns equal to zero and an in-house code for the leak rate evaluations. The present report has shown that these conditions give the largest LBB-margins both in terms of the quotient between the critical crack length and the leakage crack size and for the leak rate margin. - Crack morphology parameters have a strong influence on the leak rate evaluations. Using the SQUIRT code and more recent recommendations for crack morphology parameters, it is shown that in many cases the evaluated margins, using 1 gpm as the reference leak rate detection limit, are below the safety factor of 2 on crack size and 10 on leak rate, which is generally required for LBB approval. - The effect of including weld residual stresses on the LBB margins is also investigated. It is shown that for the two examples studied, weld residual stresses were important for the small diameter thin wall pipe whereas it was negligible for the large diameter thick wall pipe which had a self-balanced weld residual stress distribution

  8. 49 CFR 512.6 - How should I prepare documents when submitting a claim for confidentiality?

    Science.gov (United States)

    2010-10-01

    ... file's associated program. When alternative markings are used, such as font changes or symbols, the submitter must use one method consistently for electronic files of the same type within the same submission...

  9. 78 FR 19416 - Revisions to Patent Term Adjustment

    Science.gov (United States)

    2013-04-01

    ..., information that the submitter does not desire to make public, such as an address or phone number, should not... practice and procedure, Courts, Freedom of Information, Inventions and patents, Reporting and record...

  10. 75 FR 76050 - Notice of the Nuclear Regulatory Commission Consent to Indirect Change of Control and Issuance of...

    Science.gov (United States)

    2010-12-07

    ..., the July 20, 2010, submittal will be treated as a revision to the information regarding the corporate identity of the applicant that is contained in the respective license applications. Notice of the...

  11. Sample Set (SE): SE12 [Metabolonote[Archive

    Lifescience Database Archive (English)

    Full Text Available moto 1, Nozomu Sakurai 1, Hideyuki Suzuki 1, Tatsuya Suzuki 2, Daisuke Shibata 1, 1: Kazusa DNA Research... Institute, 2: Chiba Prefectural Agriculture Research Center Direct Submittion version 2 ...

  12. 75 FR 56423 - Approval and Promulgation of Implementation Plans; Texas; Revisions to the New Source Review (NSR...

    Science.gov (United States)

    2010-09-15

    ... disapprove the submitted six portions of the State submittals does not trigger a sanctions or Federal..., and this is not a rational basis to justify disapproving the State's rules. Response: EPA disagrees...

  13. Social Security Number Verification Service (SSNVS)

    Data.gov (United States)

    Social Security Administration — SSNVS is a service offered by SSA's Business Services Online (BSO). It is used by employers and certain third-party submitters to verify the accuracy of the names...

  14. Emergency Planning and Community Right-To-Know Act. Section 312 Tier Two report forms

    Energy Technology Data Exchange (ETDEWEB)

    Evans, R.A.; Martin, K.J.

    1997-02-01

    As required by Right-to-Know Laws and Pollution Prevention Requirements, the Y-12 Plant staff is submitting an unclassified version of the Tier-Two Forms. This report contains data for CY 1996 for all hazardous chemicals stored at the Y-12 Plant in quantities equal to or greater than 10,000 pounds and all extremely hazardous substances stored in quantities equal to or greater than 500 pounds or the threshold planning quantity, whichever is lower. Also included with this submittal is a key to the inventory, temperature, pressure, and container codes used on the report forms. This information is included to aid in the interpretation of the data presented. It is not necessary that the code information be forwarded to the referenced state and local agencies. Classified information supporting this document will be maintained on file for review by Q-cleared personnel.

  15. Reliability assurance for regulation of advanced reactors

    International Nuclear Information System (INIS)

    Fullwood, R.; Lofaro, R.; Samanta, P.

    1992-01-01

    The advanced nuclear power plants must achieve higher levels of safety than the first generation of plants. Showing that this is indeed true provides new challenges to reliability and risk assessment methods in the analysis of the designs employing passive and semi-passive protection. Reliability assurance of the advanced reactor systems is important for determining the safety of the design and for determining the plant operability. Safety is the primary concern, but operability is considered indicative of good and safe operation. this paper discusses several concerns for reliability assurance of the advanced design encompassing reliability determination, level of detail required in advanced reactor submittals, data for reliability assurance, systems interactions and common cause effects, passive component reliability, PRA-based configuration control system, and inspection, training, maintenance and test requirements. Suggested approaches are provided for addressing each of these topics

  16. Emergency Planning and Community Right-To-Know Act. Section 312 Tier Two report forms

    International Nuclear Information System (INIS)

    Evans, R.A.

    1998-02-01

    As required by Right-to-Know Laws and Pollution Prevention Requirements, the Y-12 Plant staff is submitting an unclassified version of the Tier-Two Forms. This report contains data for CY 1997 for all hazardous chemicals stored at the Y-12 Plant in quantities equal to or greater than 10,000 pounds and all extremely hazardous substances stored in quantities equal to or greater than 500 pounds or the threshold planning quantity, whichever is lower. Also included with this submittal is a key to the inventory, temperature, pressure, and container codes used on the report forms. This information is included to aid in the interpretation of the data presented. It is not necessary that the code information be forwarded to the referenced state and local agencies. Classified information supporting this document will be maintained on file for review by Q-cleared personnel

  17. Reliability assurance for regulation of advanced reactors

    International Nuclear Information System (INIS)

    Fullwood, R.; Lofaro, R.; Samanta, P.

    1991-01-01

    The advanced nuclear power plants must achieve higher levels of safety than the first generation of plants. Showing that this is indeed true provides new challenges to reliability and risk assessment methods in the analysis of the designs employing passive and semi-passive protection. Reliability assurance of the advanced reactor systems is important for determining the safety of the design and for determining the plant operability. Safety is the primary concern, but operability is considered indicative of good and safe operation. This paper discusses several concerns for reliability assurance of the advanced design encompassing reliability determination, level of detail required in advanced reactor submittals, data for reliability assurance, systems interactions and common cause effects, passive component reliability, PRA-based configuration control system, and inspection, training, maintenance and test requirements. Suggested approaches are provided for addressing each of these topics

  18. Waste Isolation Pilot Plant Safety Analysis Report

    International Nuclear Information System (INIS)

    1995-11-01

    The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions'' (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.'' This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment

  19. Waste Isolation Pilot Plant Safety Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The following provides a summary of the specific issues addressed in this FY-95 Annual Update as they relate to the CH TRU safety bases: Executive Summary; Site Characteristics; Principal Design and Safety Criteria; Facility Design and Operation; Hazards and Accident Analysis; Derivation of Technical Safety Requirements; Radiological and Hazardous Material Protection; Institutional Programs; Quality Assurance; and Decontamination and Decommissioning. The System Design Descriptions`` (SDDS) for the WIPP were reviewed and incorporated into Chapter 3, Principal Design and Safety Criteria and Chapter 4, Facility Design and Operation. This provides the most currently available final engineering design information on waste emplacement operations throughout the disposal phase up to the point of permanent closure. Also, the criteria which define the TRU waste to be accepted for disposal at the WIPP facility were summarized in Chapter 3 based on the WAC for the Waste Isolation Pilot Plant.`` This Safety Analysis Report (SAR) documents the safety analyses that develop and evaluate the adequacy of the Waste Isolation Pilot Plant Contact-Handled Transuranic Wastes (WIPP CH TRU) safety bases necessary to ensure the safety of workers, the public and the environment from the hazards posed by WIPP waste handling and emplacement operations during the disposal phase and hazards associated with the decommissioning and decontamination phase. The analyses of the hazards associated with the long-term (10,000 year) disposal of TRU and TRU mixed waste, and demonstration of compliance with the requirements of 40 CFR 191, Subpart B and 40 CFR 268.6 will be addressed in detail in the WIPP Final Certification Application scheduled for submittal in October 1996 (40 CFR 191) and the No-Migration Variance Petition (40 CFR 268.6) scheduled for submittal in June 1996. Section 5.4, Long-Term Waste Isolation Assessment summarizes the current status of the assessment.

  20. submitter Electromagnetism in a Multiconnected Universe

    CERN Document Server

    Mertens, Tom

    2016-01-01

    Our raw intuition tells us that the topology of the universe shouldn′t affect the behavior of a current-carrying wire, but when the wire wraps all the way around a multiconnected space, our intuition is wrong. While an infinitely long perfectly conducting wire in Euclidean space may carry a constant current, a simple application of the Ampère–Maxwell circuital law shows that the analogous wire in a 3-torus may not. Instead, we find that the current spontaneously oscillates, and the wire acts like an antenna, gradually radiating away its energy.

  1. FLOODPLAIN MAPPING SUBMITTAL, HUNTERDON CO., NJ

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — The Floodplain Mapping study deliverables depict and quantify the flood risks for the study area. The primary risk classifications used are the...

  2. Interoperability Across the Stewardship Spectrum in the DataONE Repository Federation

    Science.gov (United States)

    Jones, M. B.; Vieglais, D.; Wilson, B. E.

    2016-12-01

    Thousands of earth and environmental science repositories serve many researchers and communities, each with their own community and legal mandates, sustainability models, and historical infrastructure. These repositories span the stewardship spectrum from highly curated collections that employ large numbers of staff members to review and improve data, to small, minimal budget repositories that accept data caveat emptor and where all responsibility for quality lies with the submitter. Each repository fills a niche, providing services that meet the stewardship tradeoffs of one or more communities. We have reviewed these stewardship tradeoffs for several DataONE member repositories ranging from minimally (KNB) to highly curated (Arctic Data Center), as well as general purpose (Dryad) to highly discipline or project specific (NEON). The rationale behind different levels of stewardship reflect resolution of these tradeoffs. Some repositories aim to encourage extensive uptake by keeping processes simple and minimizing the amount of information collected, but this limits the long-term utility of the data and the search, discovery, and integration systems that are possible. Other repositories require extensive metadata input, review, and assessment, allowing for excellent preservation, discovery, and integration but at the cost of significant time for submitters and expense for curatorial staff. DataONE recognizes these different levels of curation, and attempts to embrace them to create a federation that is useful across the stewardship spectrum. DataONE provides a tiered model for repositories with growing utility of DataONE services at higher tiers of curation. The lowest tier supports read-only access to data and requires little more than title and contact metadata. Repositories can gradually phase in support for higher levels of metadata and services as needed. These tiered capabilities are possible through flexible support for multiple metadata standards and services

  3. 40 CFR 721.5700 - Pentanenitrile, 3-amino-.

    Science.gov (United States)

    2010-07-01

    ...), (a)(5)(xiii), (a)(5)(xiv), and (a)(5)(xv) apply following submittal by the company, and written approval by the EPA, of the results of cartridge service life testing performance in accordance with...

  4. 75 FR 773 - TSCA Section 5 Premanufacture and Significant New Use Notification Electronic Reporting...

    Science.gov (United States)

    2010-01-06

    ... Java 6 programming language, which can be downloaded free from http://www.java.com , if it is not... application programming interface to enable the submitter to interact with CDX to encrypt the submission. The...

  5. Preliminary Safety Information Document for the Standard MHTGR. Volume 1, (includes latest Amendments)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-01-01

    With NRC concurrence, the Licensing Plan for the Standard HTGR describes an application program consistent with 10CFR50, Appendix O to support a US Nuclear Regulatory Commission (NRC) review and design certification of an advanced Standard modular High Temperature Gas-Cooled Reactor (MHTGR) design. Consistent with the NRC's Advanced Reactor Policy, the Plan also outlines a series of preapplication activities which have as an objective the early issuance of an NRC Licensability Statement on the Standard MHTGR conceptual design. This Preliminary Safety Information Document (PSID) has been prepared as one of the submittals to the NRC by the US Department of Energy in support of preapplication activities on the Standard MHTGR. Other submittals to be provided include a Probabilistic Risk Assessment, a Regulatory Technology Development Plan, and an Emergency Planning Bases Report.

  6. Information Spreadsheet for Engines and Vehicles Compliance Information System (EV-CIS) User Registration

    Science.gov (United States)

    In this spreadsheet, user(s) provide their company’s manufacturer code, user contact information for EV-CIS, and user roles. This spreadsheet is used for the Company Authorizing Official (CAO), CROMERR Signer, and EV-CIS Submitters.

  7. Notice of Construction for Tank Waste Remediation System Vadose Zone Characterization

    Energy Technology Data Exchange (ETDEWEB)

    HILL, J.S.

    2000-03-08

    The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions & Defense Waste Section as a notice of construction (NOC) in accordance with Washington Administrative Code (WAC) 246-247, Radiation Protection--Air Emissions. The WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A,'' Appendix A (WAC 246-247-1 10) lists the requirements that must be addressed. The original NOC was submitted in May of 1999 as DOE/TU-99-34. Additionally, the following description, attachments and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 millirem/year total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI), and commencement is needed within a short time frame. Therefore, this application is also intended to provide notification of the anticipated date of initial startup in accordance with the requirement listed in 40 CFR 61.09(axl), and it is requested that approval of this application will also constitute EPA acceptance of this initial start-up notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2) will be provided at a later date. This NOC covers the activities associated with vadose zone characterization within the Single-Shell Tank Farms located in the

  8. Notice of Construction for Tank Waste Remediation System Vadose Zone Characterization

    Energy Technology Data Exchange (ETDEWEB)

    HILL, J.S.

    2000-04-20

    The following description and any attachments and references are provided to the Washington State Department of Health (WDOH), Division of Radiation Protection, Air Emissions and Defense Waste Section as a notice of construction (NOC) in accordance with Washington Administrative Code (WAC) 246-247, Radiation Protection-Air Emissions. The WAC 246-247-060, ''Applications, registration, and licensing'', states ''This section describes the information requirements for approval to construct, modify, and operate an emission unit. Any NOC requires the submittal of information listed in Appendix A.'' Appendix A (WAC 246-247-1 10) lists the requirements that must be addressed. The original NOC was submitted in May of 1999 as DOm-99-34. Additionally, the following description, attachments and references are provided to the U.S. Environmental Protection Agency (EPA) as an NOC, in accordance with Title 40 Code of Federal Regulations (CFR), Part 61, ''National Emission Standards for Hazardous Air Pollutants.'' The information required for submittal to the EPA is specified in 40 CFR 61.07. The potential emissions from this activity are estimated to provide less than 0.1 milliredyear total effective dose equivalent (TEDE) to the hypothetical offsite maximally exposed individual (MEI), and commencement is needed within a short time frame. Therefore, this application is also intended to provide notification of the anticipated date of initial start-up in accordance with the requirement listed in 40 CFR 61.09(a)(1), and it is requested that approval of this application will also constitute EPA acceptance of this initial start-up notification. Written notification of the actual date of initial startup, in accordance with the requirement listed in 40 CFR 61.09(a)(2) will be provided at a later date. This NOC covers the activities associated with vadose zone characterization within the Single-Shell Tank Farms located in the 200

  9. 75 FR 4402 - Strengthening the Center for Devices and Radiological Health's 510(k) Review Process; Public...

    Science.gov (United States)

    2010-01-27

    ... beginning at 7 a.m. If you need special accommodations due to a disability, please contact James Swink at...) under the 510(k) Paradigm, bundling of devices in 510(k) submissions, and reliance on 510(k) submitters...

  10. Construction quality assurance report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project

  11. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

  12. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report

    International Nuclear Information System (INIS)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System's Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a open-quotes green fieldclose quotes condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined

  13. 77 FR 4815 - Ace Info Solutions, Inc., and Information International Associates; Transfer of Data

    Science.gov (United States)

    2012-01-31

    ... Confidential Business Information (CBI) by the submitter, will be transferred to Ace Info Solutions, Inc., and... Chemical Libraries and Repository; 4. Information architecture support, consultation on site structure and..., Business and industry, Government contracts, Government property, Security measures. Dated: January 19...

  14. Radiological Effluent Technical Specifications (RETS) implementation, Kewaunee Nuclear Power Plant

    International Nuclear Information System (INIS)

    Serrano, W.; Akers, D.W.

    1985-06-01

    A review of the Radiological Effluent Technical Specifications (RETS) for the Kewaunee Nuclear Power Plant was performed. The principal review guidelines used were NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants,'' and Draft 7'' of NUREG-0472, Revision 3, ''Radiological Effluent Technical Specifications for Pressurized Water Reactors.'' Draft submittals were discussed with the Licensee by the NRC staff until all items requiring changes to the Technical Specifications were resolved. The Licensee then submitted final proposed RETS to the NRC which were evaluated and found to be in compliance with the NRC review guidelines. The proposed Offsite Dose Calculation Manual and the Radiological Environmental Monitoring Manual were reviewed and generally found to be in compliance with the NRC review guidelines

  15. Idaho National Laboratory PCB Annual Document Log and Annual Records Report for calendar year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Layton, Deborah L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-06-01

    The requirements for the reporting of polychlorinated biphenyl (PCB)-related activities are found in 40 Code of Federal Regulations (CFR) 761 Subpart J, "General Records and Reports." The PCB Annual Document Log is a detailed record of the PCB waste handling activities at the facility. The facility must prepare it each year by July 1 and maintain it at the facility for at least 3 years after the facility ceases using or storing PCBs and PCB items. While submittal of the PCB Annual Document Log to the U.S. Environmental Protection Agency (EPA) is not required by regulation, EPA has verbally requested in telephone conversations that this report be submitted to them on an annual basis. The Annual Records are not required to be submitted to EPA and are not considered to be part of the Annual Document Log, but are included to provide the complete disposition history or status of all PCB activities during the year. The Annual Document Log section of this report (Section 2.0) meets the requirements of 40 CFR 761.180(a)(2), as applicable, while the Annual Records section (Section 3.0) meets the requirement of 40 CFR 761.180(a)(1).

  16. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - main report. Final report

    International Nuclear Information System (INIS)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System's Washington Nuclear Plant Two (WNP-2), which is a boiling water reactor (BWR), located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a open-quotes green fieldclose quotes condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low- level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined

  17. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - main report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), which is a boiling water reactor (BWR), located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low- level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

  18. 75 FR 78916 - Approval and Promulgation of State Air Quality Plans for Designated Facilities and Pollutants...

    Science.gov (United States)

    2010-12-17

    ... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants, Commonwealth of Virginia; Control of Emissions From Existing Hospital/Medical/Infectious Waste Incinerator (HMIWI) Units, Negative... 19103. Copies of the State submittal are available at the Virginia Department of Environmental Quality...

  19. 50 CFR 680.41 - Transfer of QS, PQS, IFQ and IPQ.

    Science.gov (United States)

    2010-10-01

    ... and print approvals and permits online. (5) Submittal. Submit applications and other documents to NMFS... tax ID number; applicant's permanent business mailing address and any temporary business mailing address the applicant wishes to use, and the applicant's business telephone number, business facsimile...

  20. Conformance to Regulatory Guide 1.97, Perry Nuclear Power Plant, Unit Nos. 1 and 2 (Docket Nos. 50-440 and 50-441)

    International Nuclear Information System (INIS)

    Udy, A.C.

    1985-03-01

    This EG and G Idaho, Inc., report provides a review of the submittals for Regulatory Guide 1.97, Revision 2, for the Perry Nuclear Power Plant, Unit Nos. 1 and 2. Any exception to the guidelines of Regulatory Guide 1.97 are evaluated

  1. Annual Progress Report on the Development of Waste Tank Leak Monitoring and Detection and Mitigation Activities in Support of M-45-08

    International Nuclear Information System (INIS)

    DEFIGH PRICE, C.

    2000-01-01

    Milestone M-45-09E of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) [TPA 1996] requires submittal of an annual progress report on the development of waste tank leak detection, monitoring, and mitigation (LDMM) activities associated with the retrieval of waste from single-shell tanks (SSTs). This report details progress for fiscal year 2000, building on the current LDMM strategy and including discussion of technologies, applications, cost, schedule, and technical data. The report also includes discussion of demonstrations conducted and recommendations for additional testing. Tri-Party Agreement Milestones M-45-08A and M-45-08B required design and demonstration of LDMM systems for initial retrieval of SST waste. These specific milestones have recently been deleted as part of the M-45-00A change package. Future LDMM development work has been incorporated into specific technology demonstration milestones and SST waste retrieval milestones in the M-45-03 and M-45-05 milestone series

  2. Improvements in inservice testing regulatory guidance

    Energy Technology Data Exchange (ETDEWEB)

    Campbell, P.L.

    1996-12-01

    Over the last few years, the NRC has issued guidance to licensees toward improving the quality of requests for relief or alternatives to the code requirements and bring some measure of consistency to the implementation of the code requirements. Based on the majority of the recent submittals, the overall quality has improved. If all of the steps in the internal process for responding to the requests are timely, the review of an updated program can be completed in six to nine months. When a single or only a few requests are submitted, the staff is generally able to complete an evaluation in less than three months. When schedules are related to outages or exigent circumstances, the NRC responds accordingly. The improvements in schedules can be attributed to publication of staff guideline documents, licensees` efforts in preparing more complete descriptions and justification and an increase in the number of NRC technical staff reviewers assigned to IST.

  3. Draft guidelines for an environmental impact assessment small scale hydroelectric plant redevelopment

    International Nuclear Information System (INIS)

    1992-01-01

    A pulp and paper company in St. George, New Brunswick, is proposing to redevelop an existing hydroelectric plant built around 1900. The redevelopment proposal consists of decommissioning the existing powerhouse, constructing a new powerhouse containing a 12-MW Kaplan turbine, excavating a tailrace channel, and installing a new penstock. Other design considerations include improvements to gates in the main dam for improved flood control and modifications to the trash racks to prevent potential fish mortality. The provincial environment ministry has determined that an environmental impact assessment of the potential impacts of the redevelopment was required. Guidelines to be used in the assessment process are presented, including definition of the study boundaries, prediction of environmental effects, description of methods of mitigating and compensating for anticipated impacts, a commitment to monitoring and public consultation, and submittal of terms of reference in response to final assessment guidelines. Requirements for conducting the assessment study and content of the report are also listed. 1 fig

  4. Improvements in inservice testing regulatory guidance

    International Nuclear Information System (INIS)

    Campbell, P.L.

    1996-01-01

    Over the last few years, the NRC has issued guidance to licensees toward improving the quality of requests for relief or alternatives to the code requirements and bring some measure of consistency to the implementation of the code requirements. Based on the majority of the recent submittals, the overall quality has improved. If all of the steps in the internal process for responding to the requests are timely, the review of an updated program can be completed in six to nine months. When a single or only a few requests are submitted, the staff is generally able to complete an evaluation in less than three months. When schedules are related to outages or exigent circumstances, the NRC responds accordingly. The improvements in schedules can be attributed to publication of staff guideline documents, licensees' efforts in preparing more complete descriptions and justification and an increase in the number of NRC technical staff reviewers assigned to IST

  5. OrthoImagery submittal for Clinton County, Indiana

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Digital orthographic imagery datasets contain georeferenced images of the Earth?s surface, collected by a sensor in which object displacement has been removed for...

  6. OrthoImagery submittal for Gibson County, Indiana

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Digital orthographic imagery datasets contain georeferenced images of the Earth?s surface, collected by a sensor in which object displacement has been removed for...

  7. DCS Terrain Submittal for Socorro County NM

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describe the digital topographic data that were used to create...

  8. Digital Terrain Submittal for Duval County, FL

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  9. OrthoImagery submittal for Allen County, Indiana

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Digital orthographic imagery datasets contain georeferenced images of the Earth?s surface, collected by a sensor in which object displacement has been removed for...

  10. DCS Hydraulics Submittal, Bullock County, Alabama, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydraulics data includes spatial datasets and data tables necessary for documenting the hydraulic procedures for computing flood elevations for a flood insurance...

  11. DCS Hydraulics Submittal, Butler County, Alabama, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydraulics data includes spatial datasets and data tables necessary for documenting the hydraulic procedures for computing flood elevations for a flood insurance...

  12. DCS Hydraulics Submittal, Covington County, Alabama, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydraulics data includes spatial datasets and data tables necessary for documenting the hydraulic procedures for computing flood elevations for a flood insurance...

  13. DCS Hydrology Submittal, Washita County, Oklahoma, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydrology data include spatial datasets and data tables necessary for documenting the hydrologic procedures for estimating flood discharges for a flood insurance...

  14. OrthoImagery submittal for Scott County, Indiana

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Digital orthographic imagery datasets contain georeferenced images of the Earth's surface, collected by a sensor in which object displacement has been removed for...

  15. OrthoImagery submittal for Switzerland County, Indiana

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Digital orthographic imagery datasets contain georeferenced images of the Earth's surface, collected by a sensor in which object displacement has been removed for...

  16. DCS Hydraulics Submittal, Harmon County, Oklahoma, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  17. DCS Hydrology Submittal, Harmon County, Oklahoma, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydrology data include spatial datasets and data tables necessary for documenting the hydrologic procedures for estimating flood discharges for a flood insurance...

  18. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... California State Implementation Plan; South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District portion of the California State Implementation... Submittal A. What rule did the State submit? We are approving South Coast Air Quality Management District...

  19. 32 CFR 518.9 - Reading room.

    Science.gov (United States)

    2010-07-01

    ... RELATIONS THE FREEDOM OF INFORMATION ACT PROGRAM FOIA Reading Rooms § 518.9 Reading room. (a) Reading room... clearly unwarranted invasions of privacy, or competitive harm to business submitters. In appropriate cases... information concerning munitions, equipment, systems, and intelligence activities. (4) (a)(2)(D) records...

  20. 40 CFR 51.152 - Contingency plans.

    Science.gov (United States)

    2010-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency... emission control actions to be taken at each episode stage. (Examples of emission control actions are set...: (1) Prompt acquisition of forecasts of atmospheric stagnation conditions and of updates of such...

  1. 75 FR 17737 - Industrial Economics, Incorporated; Transfer of Data

    Science.gov (United States)

    2010-04-07

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2010-0194; FRL-8820-2] Industrial Economics... (CBI) by the submitter, will be transferred to Industrial Economics, Incorporated in accordance with 40 CFR 2.307(h)(3) and 2.308(i)(2). Industrial Economics, Incorporated has been awarded multiple...

  2. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  3. 76 FR 65521 - Information Collection; Geological and Geophysical Explorations of the Outer Continental Shelf...

    Science.gov (United States)

    2011-10-21

    ...,'' enter BOEM-2011-0036 then click search. Follow the instructions to submit public comments and view... Ocean Energy Management (BOEM), per Secretarial Order 3299. Regulations to carry out these... burdens that are associated with cost recovery monies collected are based on actual submittals through Pay...

  4. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  5. 78 FR 54960 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Reasonably...

    Science.gov (United States)

    2013-09-09

    ... reasonably available control technology (RACT) for oxides of nitrogen (NO X ) and volatile organic compounds... are approving updates to two existing regulations limiting emissions of volatile organic compounds... certification in Massachusetts' January 31, 2008 SIP submittal that demonstrates that the state has adopted air...

  6. 77 FR 38191 - Approval and Promulgation of Implementation Plans; State of Mississippi; Regional Haze State...

    Science.gov (United States)

    2012-06-27

    ... SIP submittal followed the VISTAS modeling protocol and considered the contribution of total PM 10 and... revisions to the Mississippi State Implementation Plan (SIP) submitted by the State of Mississippi through.... Mississippi's SIP revisions address regional haze for the first implementation period. Specifically, these SIP...

  7. 75 FR 59686 - Proposed Information Collection; Comment Request; NOAA Space-Based Data Collection System (DCS...

    Science.gov (United States)

    2010-09-28

    ...., Washington, DC 20230 (or via the Internet at [email protected] ). FOR FURTHER INFORMATION CONTACT: Requests for... Environmental Satellite (GOES) DCS and the Polar-Orbiting Operational Environmental Satellite (POES) DCS, also... Collection Submittal include Internet, facsimile transmission and postal mailing of paper forms. III. Data...

  8. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    Energy Technology Data Exchange (ETDEWEB)

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  9. Repeatability & Workability Evaluation of SIGMOD 2009

    KAUST Repository

    Manegold, Stefan

    2010-12-15

    SIGMOD 2008 was the first database conference that offered to test submitters\\' programs against their data to verify the repeatability of the experiments published [1]. Given the positive feedback concerning the SIGMOD 2008 repeatability initiative, SIGMOD 2009 modified and expanded the initiative with a workability assessment.

  10. 78 FR 21547 - Approval and Promulgation of Air Quality Implementation Plans; Oregon: Eugene-Springfield PM10

    Science.gov (United States)

    2013-04-11

    ... winter day emissions from point sources, residential wood combustion, road dust, and motor vehicle exhaust, brake and tire wear. The emissions inventory includes an inventory of point sources of PM 10... State's submittal. Emissions estimates for road dust and motor vehicle exhaust, brake wear, and tire...

  11. 77 FR 45532 - Approval and Promulgation of Implementation Plans; Michigan; Detroit-Ann Arbor Nonattainment Area...

    Science.gov (United States)

    2012-08-01

    ... , volatile organic compounds (VOCs), sulfur dioxide (SO 2 ), and modeled NH 3 included in MDEQ's submittal... sources, non-EGU point sources, area sources, non-road mobile sources, marine-airport-rail (MAR) sources... 2002 model data for commercial marine vessels, locomotives and Clean Air Market Division, etc...

  12. Repeatability & Workability Evaluation of SIGMOD 2009

    KAUST Repository

    Manegold, Stefan; Manolescu, Ioana; Afanasiev, Loredana; Feng, Jieling; Gou, G.; Hadjieleftheriou, Marios; Harizopoulos, Stavros; Kalnis, Panos; Karanasos, Konstantinos; Laurent, Dominique; Lupu, M.; Onose, N.; Ré , C.; Sans, Virginie; Senellart, Pierre; Wu, T.; Shasha, Dennis E.

    2010-01-01

    SIGMOD 2008 was the first database conference that offered to test submitters' programs against their data to verify the repeatability of the experiments published [1]. Given the positive feedback concerning the SIGMOD 2008 repeatability initiative, SIGMOD 2009 modified and expanded the initiative with a workability assessment.

  13. 75 FR 27791 - Agency Information Collection Activities; Proposed Collection; Comment Request; Invitation to...

    Science.gov (United States)

    2010-05-18

    ... temperature Storage humidity Size Storage environment Picture of device MRI compatible Marketing Information.../FDAeSubmitter/UCM162419.pdf . Prior to uploading an SPL file, one must obtain a digital certificate. Instructions regarding obtaining a digital certificate used with FDA's ESG and uploading the SPL file for...

  14. 4 CFR 201.13 - Business information.

    Science.gov (United States)

    2010-01-01

    ... 4 Accounts 1 2010-01-01 2010-01-01 false Business information. 201.13 Section 201.13 Accounts RECOVERY ACCOUNTABILITY AND TRANSPARENCY BOARD PUBLIC INFORMATION AND REQUESTS § 201.13 Business information. (a) In general. Business information obtained by the Board from a submitter shall be disclosed...

  15. 37 CFR 102.9 - Business Information.

    Science.gov (United States)

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Business Information. 102.9... COMMERCE ADMINISTRATION DISCLOSURE OF GOVERNMENT INFORMATION Freedom of Information Act § 102.9 Business Information. (a) In general. Business information obtained by USPTO from a submitter will be disclosed under...

  16. 5 CFR 1631.15 - Information to be disclosed.

    Science.gov (United States)

    2010-01-01

    ..., the disclosure of which “would constitute a clearly unwarranted invasion of personal privacy.” (2)(i) Exemption 4. Commencing January 1, 1988, the submitter of confidential commercial information must, at the... released, constitute an unwarranted invasion of personal privacy if released should be identified and a...

  17. 75 FR 63209 - Indiana Michigan Power Company; Notice of Consideration of Issuance of Amendment to Facility...

    Science.gov (United States)

    2010-10-14

    ... representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is... after the onset of core damage. In addition, these systems were ineffective at mitigating hydrogen... the methodologies used in ascertaining the condition of the reactor core, mitigating the consequences...

  18. 40 CFR 52.2635 - Original identification of plan section.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan... implementation plan (SIP) for Sheridan, Wyoming. In addition to the original August 28 submittal, eight...

  19. 36 CFR 801.5 - State Historic Preservation Officer responsibilities.

    Science.gov (United States)

    2010-07-01

    ... Officer responsibilities. 801.5 Section 801.5 Parks, Forests, and Public Property ADVISORY COUNCIL ON... § 801.5 State Historic Preservation Officer responsibilities. (a) The State Historic Preservation... § 801.3(b); responding, within 45 days, to submittal of a determination by the applicant under section...

  20. 40 CFR 51.854 - Conformity analysis.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Conformity analysis. 51.854 Section 51... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Determining Conformity of General Federal Actions to State or Federal Implementation Plans § 51.854 Conformity analysis. Link to an...

  1. 77 FR 24742 - In the Matter of ABSG Consulting Inc. Confirmatory Order (Effective Immediately)

    Science.gov (United States)

    2012-04-25

    ... facility in Arlington, Virginia in an ADR session mediated by a professional mediator, arranged through... access the E-Submittal server for any proceeding in which it is participating; and (2) advise the... server are detailed in NRC's ``Guidance for Electronic Submission,'' which is available on the agency's...

  2. Health and Safety Management Plan for the Plutonium Stabilization and Packaging System

    International Nuclear Information System (INIS)

    1996-01-01

    This Health and Safety Management Plan (HSMP) presents safety and health policies and a project health and safety organizational structure designed to minimize potential risks of harm to personnel performing activities associated with Plutonium Stabilization and Packaging System (Pu SPS). The objectives of the Pu SPS are to design, fabricate, install, and startup of a glovebox system for the safe repackaging of plutonium oxides and metals, with a requirement of a 50-year storage period. This HSMP is intended as an initial project health and safety submittal as part of a three phase effort to address health and safety issues related to personnel working the Pu SPS project. Phase 1 includes this HSMP and sets up the basic approach to health and safety on the project and addresses health and safety issues related to the engineering and design effort. Phase 2 will include the Site Specific Construction health and Safety Plan (SSCHSP). Phase 3 will include an additional addendum to this HSMP and address health and safety issues associated with the start up and on-site test phase of the project. This initial submittal of the HSMP is intended to address those activities anticipated to be performed during phase 1 of the project. This HSMP is intended to be a living document which shall be modified as information regarding the individual tasks associated with the project becomes available. These modifications will be in the form of addenda to be submitted prior to the initiation of each phase of the project. For additional work authorized under this project this HSMP will be modified as described in section 1.4

  3. Estimating pressurized water reactor decommissioning costs: A user's manual for the PWR Cost Estimating Computer Program (CECP) software

    International Nuclear Information System (INIS)

    Bierschbach, M.C.; Mencinsky, G.J.

    1993-10-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  4. Estimating boiling water reactor decommissioning costs. A user's manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    International Nuclear Information System (INIS)

    Bierschbach, M.C.

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  5. User's manual for applicants proposing on-site burial of self-generated radioactive waste

    International Nuclear Information System (INIS)

    Tolbert, M.E.M.; Loretan, P.A.

    1987-01-01

    This document describes, for medical and research institutions as well as industrial generators of low-level radioactive waste, the NRC or state submittal requirements for authorizing the on-site burial of self-generated radioactive waste. An important part of completing the license application for operation justifying this alternative for waste disposal over other alternatives. Reasons that might be considered acceptable might include the need to dispose of large volumes of low activity waste that would otherwise take up valuable space in commercial sites; the ability to demonstrate that this method of disposal will result in reduced exposures to the public; the ability to show that the prohibitive costs of other methods of disposal would be detrimental to the progress of significant research which generates radioactive waste. 19 refs., 3 figs., 4 tabs

  6. Radiological Effluent Technical Specifications (RETS) implementation: Zion Generating Station Units 1 and 2

    International Nuclear Information System (INIS)

    Serrano, W.; Akers, D.W.; Duce, S.W.; Mandler, J.W.; Simpson, F.B.; Young, T.E.

    1985-06-01

    A review of the Radiological Effluent Technical Specifications (RETS) of the Zion Generating Station Units 1 and 2 was performed. The principal review guidelines used were NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants,'' and Draft 7 of NUREG-0472, Revision 3, ''Radiological Effluent Technical Specifications for Pressurized Water Reactors.'' Draft submittals were discussed with the Licensee by both EG and G and the NRC staff until all items requiring changes to the Technical Specifications were resolved. The Licensee then submitted final proposed RETS to the NRC which were evaluated and found to be in compliance with the NRC review guidelines. The proposed Offsite Dose Calculation Manual was reviewed and generally found to be consistent with the NRC review guidelines. 35 refs., 2 figs., 1 tab

  7. 40 CFR 35.926 - Value engineering (VE).

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Value engineering (VE). 35.926 Section... engineering (VE). (a) Value engineering proposal. All step 2 grant applications for projects having a... completion of VE analysis and submittal of VE summary reports). (b) Value engineering analysis. For projects...

  8. 77 FR 22759 - Proposed Information Collection; Comment Request; Southeast Region Bottlenose Dolphin...

    Science.gov (United States)

    2012-04-17

    ... they gained their knowledge and/or perceptions on the topic. The first survey was conducted in Panama... Participants voluntarily complete paper questionnaires and methods of submittal include on-site, mail, and facsimile transmission of paper forms. III. Data OMB Control Number: 0648-0594. Form Number: None. Type of...

  9. Topical report review status. Volume 9, No. 1

    International Nuclear Information System (INIS)

    1995-02-01

    This report provides industry with procedures for submitting topical reports, guidance on how the US Nuclear Regulatory Commission (NRC) processes and responds to topical report submittals, and an accounting, with review schedules, of all topical reports currently accepted for review by the NRC. This report is published semiannually

  10. 46 CFR 50.20-30 - Alternative materials or methods of construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Alternative materials or methods of construction. 50.20... ENGINEERING GENERAL PROVISIONS Plan Submittal and Approval § 50.20-30 Alternative materials or methods of construction. (a) When new or alternative procedures, designs, or methods of construction are submitted for...

  11. 12 CFR 1202.2 - What do the terms in this part mean?

    Science.gov (United States)

    2010-01-01

    ... form or format, including electronic, which FHFA— (1) Created or received under federal law or in... reading the regulations in this part are— Appeals Officer or FOIA Appeals Officer means a person... government by a submitter that arguably contain material exempt from release under Exemption 4 of the Freedom...

  12. 75 FR 29155 - Publicly Available Consumer Product Safety Information Database

    Science.gov (United States)

    2010-05-24

    ... consumer product incident reports involving a description of incidents related to the use of consumer... consumer product must include a word or phrase sufficient to distinguish a product identified in a report... consumer product; or understand the relationship between the submitter of a report of harm and the victim...

  13. 77 FR 47371 - Proposed Information Collection; Comment Request; Alaska Interagency Electronic Reporting System...

    Science.gov (United States)

    2012-08-08

    ... of Fish and Game (ADF&G), and the International Pacific Halibut Commission (IPHC). eLandings and sea... authorized officers. Some of the benefits of IERS include: improved data quality, automated processing of.... Method of Collection Methods of submittal include online and email. Clients with no Web access, such as...

  14. 10 CFR 13.2 - Definitions.

    Science.gov (United States)

    2010-01-01

    ... identity when filing documents and serving participants electronically through the E-Filing system, and... transmitted electronically from the E-Filing system to the submitter confirming receipt of electronic filing... presentation of the docket and a link to its files. E-Filing System means an electronic system that receives...

  15. Topical report review status: Volume 10

    International Nuclear Information System (INIS)

    1996-03-01

    This report provides industry with procedures for submitting topical reports, guidance on how the U.S. Nuclear Regulatory Commission (NRC) processes and responds to topical report submittals, and an accounting, with review schedules, of all topical reports currently accepted for review by the NRC. This report is published annually

  16. 78 FR 6035 - Approval and Promulgation of Air Quality Implementation Plans; Ohio and Indiana; Cincinnati...

    Science.gov (United States)

    2013-01-29

    ... document that growth and control strategy assumptions for non-motor vehicle sources continue to be valid... the projections need to be made. Ohio and Indiana find that growth and control strategy assumptions... original submittal for the years 2005, 2015, and 2020. As a result, the growth and control strategy...

  17. 75 FR 9956 - PSEG Nuclear LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1...

    Science.gov (United States)

    2010-03-04

    ... letter number LR-N09- 0248 and the second enclosure is an environmental impact statement. Based on a... November 3, and November 20, 2009, submittals, with the exception of the environmental impact statement... M. S. Fertel, Nuclear Energy Institute, ADAMS Accession No. ML091410309). The licensee's request for...

  18. 76 FR 11456 - Science Advisory Board Staff Office; Notification of a Public Meeting of the Chartered Science...

    Science.gov (United States)

    2011-03-02

    ... consideration prior to this meeting. Written statements should be supplied to the DFO in the following formats: one hard copy with original signature and one electronic copy via e-mail (acceptable file format... format). Submitters are asked to provide electronic versions of each document submitted with and without...

  19. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Science.gov (United States)

    2010-07-01

    ... comprehensive electronic-magnetic report and a written hard copy data summary report. (ii) The electronic report shall be on magnetic or optical media, and such submittal shall follow the reporting format of electronic data being submitted to the MDEQ. EPA may modify the reporting format delineated in this section...

  20. 78 FR 23927 - Forms and Procedures for Submitting Attest Engagements Under Various Subparts

    Science.gov (United States)

    2013-04-23

    ... attest engagement procedures described in this notice are effective starting with attest engagements due... documents and provide a secure environment for data exchange. Among the advantages offered by CDX are the... claimed as confidential business information by the submitter), but the data must be made available to EPA...

  1. 78 FR 22576 - Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards...

    Science.gov (United States)

    2013-04-16

    ... sign documents and access the E-Submittal server for any proceeding in which it is participating; and... conditions associated with reactor core power levels up to 70 percent Rated Thermal Power (2406.6 megawatts... (unless this document describes a different method for submitting comments on a specific subject): Federal...

  2. 77 FR 2466 - Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Colorado: Smoke...

    Science.gov (United States)

    2012-01-18

    ... limitations for new cement manufacturing sources. This revision was removed by the State prior to the... the reference to new cement manufacturing plants in Section VI.B.4.i. The ``Proposed Action'' section... submittal changed Section III.C.1.a. regarding manufacturing processes emission rates, to clarify that the...

  3. Conformance to Regulatory Guide 1.97, River Bend Station, Unit No. 1 (Docket No. 50-458)

    International Nuclear Information System (INIS)

    Udy, A.C.

    1985-08-01

    This EG and G, Inc., report reviews the submittals for Regulatory Guide 1.97, Revision 3, for the River Bend Station, Unit No. 1. Any exception to Regulatory Guide 1.97 is evaluated and those areas where sufficient basis for acceptability is not provided are identified. 8 refs

  4. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Science.gov (United States)

    2012-03-08

    ...-hour ozone standard, that they review the VOC content limits for wood adhesives. This category of adhesives is included in the CTG recommended VOC emission limits. Overall, Part 228: (1) Regulates the same.... EPA has evaluated New York's submittal for consistency with the Clean Air Act, EPA regulations, and...

  5. Structure, Features, and Faculty Content in ARL Member Repositories

    Science.gov (United States)

    Mercer, Holly; Koenig, Jay; McGeachin, Robert B.; Tucker, Sandra L.

    2011-01-01

    Questions about the optimal way to present repository content to authors, submitters, and end-users, prompted this study. The authors examined, through an observation and a survey, the institutional repositories of peer institutions in the ARL for good practices related to the presentation and organization of faculty-authored institutional…

  6. MELCOR 1.8.1 calculations of ISP31: The CORA-13 experiment

    International Nuclear Information System (INIS)

    Gross, R.J.; Thompson, S.L.; Martinez, G.M.

    1993-06-01

    The MELCOR code was used to simulate one of GRS's (a reactor research group in Germany) core degradation experiments conducted in the CORA out-of-pile test facility. This test, designated CORA-13, was selected as one of the International Standard Problems, Number ISP31, by the Organization for Economic Cooperation and Development. In this blind calculation, only initial and boundary conditions were provided. The experiment consisted of a small core bundle of twenty-five PWR fuel elements that was electrically heated to temperatures greater than 2,800 K. The experiment composed three phases: a 3,000 second gas preheat phase, an 1,870 second transient phase, and a 180 second water quench phase. MELCOR predictions are compared both to the experimental data and to eight other ISP31 submittals. Temperatures of various components, energy balance, zircaloy oxidation, and core blockage are examined. Up to the point where oxidation was significant, MELCOR temperatures agreed very well with the experiment -- usually to within 50 K. MELCOR predicted oxidation to occur about 100 seconds earlier and at a faster rate than experimental data. The large oxidation spike that occurred during quench was not predicted. However, the experiment produced 210 grams of hydrogen, while MELCOR predicted 184 grams, which was one of the closest integral predictions of the nine submittals. Core blockage was of the right magnitude; however, material collected on the lower grid spacer in the experiment at an axial location of 450 mm, while in MELCOR the material collected at the 50 to 150 mm location. In general, compared to the other submittals, the MELCOR calculation was superior

  7. MELCOR 1.8.1 calculations of ISP31: The CORA-13 experiment

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R.J.; Thompson, S.L.; Martinez, G.M.

    1993-06-01

    The MELCOR code was used to simulate one of GRS`s (a reactor research group in Germany) core degradation experiments conducted in the CORA out-of-pile test facility. This test, designated CORA-13, was selected as one of the International Standard Problems, Number ISP31, by the Organization for Economic Cooperation and Development. In this blind calculation, only initial and boundary conditions were provided. The experiment consisted of a small core bundle of twenty-five PWR fuel elements that was electrically heated to temperatures greater than 2,800 K. The experiment composed three phases: a 3,000 second gas preheat phase, an 1,870 second transient phase, and a 180 second water quench phase. MELCOR predictions are compared both to the experimental data and to eight other ISP31 submittals. Temperatures of various components, energy balance, zircaloy oxidation, and core blockage are examined. Up to the point where oxidation was significant, MELCOR temperatures agreed very well with the experiment -- usually to within 50 K. MELCOR predicted oxidation to occur about 100 seconds earlier and at a faster rate than experimental data. The large oxidation spike that occurred during quench was not predicted. However, the experiment produced 210 grams of hydrogen, while MELCOR predicted 184 grams, which was one of the closest integral predictions of the nine submittals. Core blockage was of the right magnitude; however, material collected on the lower grid spacer in the experiment at an axial location of 450 mm, while in MELCOR the material collected at the 50 to 150 mm location. In general, compared to the other submittals, the MELCOR calculation was superior.

  8. Assessing Requirements Quality through Requirements Coverage

    Science.gov (United States)

    Rajan, Ajitha; Heimdahl, Mats; Woodham, Kurt

    2008-01-01

    In model-based development, the development effort is centered around a formal description of the proposed software system the model. This model is derived from some high-level requirements describing the expected behavior of the software. For validation and verification purposes, this model can then be subjected to various types of analysis, for example, completeness and consistency analysis [6], model checking [3], theorem proving [1], and test-case generation [4, 7]. This development paradigm is making rapid inroads in certain industries, e.g., automotive, avionics, space applications, and medical technology. This shift towards model-based development naturally leads to changes in the verification and validation (V&V) process. The model validation problem determining that the model accurately captures the customer's high-level requirements has received little attention and the sufficiency of the validation activities has been largely determined through ad-hoc methods. Since the model serves as the central artifact, its correctness with respect to the users needs is absolutely crucial. In our investigation, we attempt to answer the following two questions with respect to validation (1) Are the requirements sufficiently defined for the system? and (2) How well does the model implement the behaviors specified by the requirements? The second question can be addressed using formal verification. Nevertheless, the size and complexity of many industrial systems make formal verification infeasible even if we have a formal model and formalized requirements. Thus, presently, there is no objective way of answering these two questions. To this end, we propose an approach based on testing that, when given a set of formal requirements, explores the relationship between requirements-based structural test-adequacy coverage and model-based structural test-adequacy coverage. The proposed technique uses requirements coverage metrics defined in [9] on formal high-level software

  9. 77 FR 20577 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Central Indiana...

    Science.gov (United States)

    2012-04-05

    ... projections need to be made. The submittal states that ``growth and control strategy assumptions for non... future. As a result, the growth and control strategy assumptions for the non-mobile sources for the years... maintenance year inventories, and (2) The state can document that growth and control strategy assumptions for...

  10. 78 FR 17102 - Setting and Adjusting Patent Fees; Correction

    Science.gov (United States)

    2013-03-20

    ... inspection, information that the submitter does not desire to make public, such as an address or phone number... a statutory invention registration'' and ``Sec. 1.296--to withdraw a request for publication of a statutory invention registration filed on or after the date the notice of intent to publish issued.'' These...

  11. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  12. 10 CFR 40.31 - Application for specific licenses.

    Science.gov (United States)

    2010-01-01

    ... response organizations expected to respond in case of an accident 60 days to comment on the licensee's... environment shall be filed at least 9 months prior to commencement of construction of the plant or facility in... case of renewal applications submitted before July 27, 1990, this submittal may follow the renewal...

  13. 77 FR 21815 - South Carolina Electric And Gas Company (Virgil C. Summer Nuclear Station Units 2 and 3); Order...

    Science.gov (United States)

    2012-04-11

    ... (or its counsel or representative) to digitally sign documents and access the E-Submittal server for... fuel pool contained the highest heat load of the six units with the full core present in the spent fuel... adequate evidence but on mere suspicion, unfounded allegations, or error. All documents filed in NRC...

  14. 75 FR 13314 - Duke Energy Carolinas, LLC; Notice of Consideration of Issuance of Amendments to Facility...

    Science.gov (United States)

    2010-03-19

    ... representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is... reactor cores with fuel containing lumped burnable and/or gadolinia integral absorbers does not involve a... acceptability of the CASMO-4/SIMULATE-3 code for performing reload design calculations for reactor cores...

  15. 75 FR 12576 - Duke Energy Carolinas, LLC; Notice of Consideration of Issuance of Amendments to Facility...

    Science.gov (United States)

    2010-03-16

    ... representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is... transients. The Core Operating Limits Report (COLR) will be developed in accordance with the approved... core safety limits will continue to be met by analyzing the reload using NRC approved methods and...

  16. 40 CFR 86.1865-12 - How to comply with the fleet average CO2 standards.

    Science.gov (United States)

    2010-07-01

    ... efficiency credits earned according to the provisions of § 86.1866-12(c); (iii) Off-cycle technology credits... change Selective Enforcement Auditing or in-use testing failures from a failure to a non-failure. The.... (l) Maintenance of records and submittal of information relevant to compliance with fleet average CO...

  17. Partially Ventilated Transom Flow Elevations-Unsteady Analysis

    Science.gov (United States)

    2016-06-30

    questions or concerns relating to this submittal. Sincerely ~o~"L Richard A. Royce, Ph.D. Director of Research James J. Henry Professor of Naval...Symposium on Naval Hydrodynamics, Rome, Italy, September 2006. O’Dea, J. , Jenkins , D., and Nagle, T. "Flow Characteristics of a Transom Stem Ship

  18. 12 CFR 1102.309 - Confidential treatment procedures.

    Science.gov (United States)

    2010-01-01

    ... to the ASC or within ten business days thereafter. Nothing in this section limits the authority of... information would be useful to competitors or would impair sales or similar statements generally will not be... shall provide the submitter with a reasonable opportunity, no longer than ten business days, to submit...

  19. 76 FR 52952 - Student Services Contract EP-11-D-000403 Yin Gu; Transfer of Data

    Science.gov (United States)

    2011-08-24

    ... will enable Student Services Contract EP-11-D-000403 Yin Gu to fulfill the obligations of the contract... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2011-0038; FRL-8884-1] Student Services Contract EP-11... Business Information (CBI) by the submitter, will be transferred to Student Services Contract EP- 11-D...

  20. 77 FR 44551 - Approval of Air Quality Implementation Plans; Arizona; Interstate Transport of Fine Particulate...

    Science.gov (United States)

    2012-07-30

    ... related to the evaluation of impacts of interstate transport of air pollutants. In this action, EPA is... the 2011 Transport Rule (also known as the ``Cross- State Air Pollution Rule'' or ``CSAPR'').\\5\\ In...\\ Within that submittal, Appendix B, ``Clean Air Act Section 110(a)(2)(D)(i)-- Interstate Transport...

  1. 28 CFR 16.8 - Business information.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Business information. 16.8 Section 16.8... Procedures for Disclosure of Records Under the Freedom of Information Act § 16.8 Business information. (a) In general. Business information obtained by the Department from a submitter will be disclosed under the FOIA...

  2. 78 FR 32250 - CDM Smith and Dynamac Corp; Transfer of Data

    Science.gov (United States)

    2013-05-29

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2013-0036; FRL-9387-5] CDM Smith and Dynamac Corp... the submitter, will be transferred to CDM Smith and its subcontractor, Dynamac Corp, in accordance with 40 CFR 2.307(h)(3) and 2.308(i)(2). CDM Smith and its subcontractor, Dynamac Corp, have been...

  3. 40 CFR 52.370 - Identification of plan.

    Science.gov (United States)

    2010-07-01

    ... submittal attachments #1 and #2, “Sulfur Dioxide” and “Transport of Sulfur Dioxide” and the section of attachment #3 “Control of Sulfur Oxides” entitled “Sample Analysis of a Btu Bubble Application”. (15) Non...) State Order No. 8073: State of Connecticut vs. City of New Haven (effective September 24, 1993) and...

  4. 77 FR 36273 - Notification of a Joint Public Meeting of the Chartered Science Advisory Board and Chartered...

    Science.gov (United States)

    2012-06-18

    ... meeting. Written statements should be supplied to the DFO in the following formats: one hard copy with original signature and one electronic copy via email (acceptable file format: Adobe Acrobat PDF, MS Word, WordPerfect, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are...

  5. 75 FR 80048 - Science Advisory Board Staff Office; Notification of an Upcoming Meeting of the Science Advisory...

    Science.gov (United States)

    2010-12-21

    ... be supplied to the DFO in the following formats: One hard copy with original signature, and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/ Windows 98/2000/XP format). Submitters are requested to provide two...

  6. 76 FR 66717 - Notification of a Public Teleconference of the Clean Air Scientific Advisory Committee Air...

    Science.gov (United States)

    2011-10-27

    ... statements should be supplied to the DFO in the following formats: one hard copy with original signature, and one electronic copy via email (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/ Windows 98/2000/XP format). Submitters are requested to...

  7. 75 FR 2542 - Science Advisory Board Staff Office Notification of a Public Meeting of the Science Advisory...

    Science.gov (United States)

    2010-01-15

    ... DFO in the following formats: one hard copy with original signature, and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are requested to provide two versions of each...

  8. 76 FR 32198 - Science Advisory Board Staff Office Notification of a Joint Public Meeting of the Chartered...

    Science.gov (United States)

    2011-06-03

    ... meeting. Written statements should be supplied to the DFO in the following formats: One hard copy with original signature and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, MS Word, WordPerfect, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are...

  9. 75 FR 9895 - Science Advisory Board Staff Office; Notification of a Public Meeting of the Science Advisory...

    Science.gov (United States)

    2010-03-04

    ... DFO in the following formats: One hard copy with original signature, and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are requested to provide two versions of each...

  10. 75 FR 37793 - Science Advisory Board Staff Office; Notification of a Public Meeting of the Science Advisory...

    Science.gov (United States)

    2010-06-30

    ... supplied to the DFO in the following formats: One hard copy with original signature, and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/ Windows 98/2000/XP format). Submitters are requested to provide two versions...

  11. Conformance to Regulatory Guide 1.97, Arkansas Nuclear One, Unit No. 1

    International Nuclear Information System (INIS)

    Stoffel, J.W.

    1985-08-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97 for Unit No. 1 of Arkansas Nuclear One and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified

  12. 77 FR 45320 - Approval and Promulgation of Implementation Plans; Mississippi; 110(a)(2)(G) Infrastructure...

    Science.gov (United States)

    2012-07-31

    ... submittal, parallel processing allows a state to submit a plan to EPA prior to actual adoption by the state... into the SIP. On July 13, 2012, the State of Mississippi, through MDEQ, submitted requests for parallel processing of draft SIP revision that the State has taken through public comment. MDEQ requested parallel...

  13. 22 CFR 303.4 - Records published in the Federal Register.

    Science.gov (United States)

    2010-04-01

    ... functions, and how the public may obtain information or forms, or make submittals or requests. The Peace... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Records published in the Federal Register. 303.4 Section 303.4 Foreign Relations PEACE CORPS PROCEDURES FOR DISCLOSURE OF INFORMATION UNDER THE FREEDOM OF...

  14. Students paperwork tracking system (SPATRASE)

    Science.gov (United States)

    Ishak, I. Y.; Othman, M. B.; Talib, Rahmat; Ilyas, M. A.

    2017-09-01

    This paper focused on a system for tracking the status of the paperwork using the Near Field Communication (NFC) technology and mobile apps. Student paperwork tracking system or known as SPATRASE was developed to ease the user to track the location status of the paperwork. The current problem faced by the user is the process of approval paperwork takes around a month or more. The process took around a month to get full approval from the department because of many procedures that need to be done. Nevertheless, the user cannot know the location status of the paperwork immediately because of the inefficient manual system. The submitter needs to call the student affairs department to get the information about the location status of the paperwork. Thus, this project was purposed as an alternative to solve the waiting time of the paperwork location status. The prototype of this system involved the hardware and software. The project consists of NFC tags, RFID Reader, and mobile apps. At each checkpoint, the RFID Reader was placed on the secretary desk. While the system involved the development of database using Google Docs that linked to the web server. After that, the submitter received the URL link and be directed to the web server and mobile apps. This system is capable of checking their location status tracking using mobile apps and Google Docs. With this system, it makes the tracking process become efficient and reliable to know the paperwork at the exact location. Thus, it is preventing the submitter to call the department all the time. Generally, this project is fully functional and we hope it can help Universiti Tun Hussein Onn Malaysia (UTHM) to overcome the problem of paperwork missing and location of the paperwork.

  15. 78 FR 52571 - Tennessee Valley Authority, Browns Ferry Nuclear Plant, Unit 1; Applications and Amendments to...

    Science.gov (United States)

    2013-08-23

    ... the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will... submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document... http://www.nrc.gov/site-help/e-submittals.html . A filing is considered complete at the time the...

  16. Conformance to Regulatory Guide 1.97, Beaver Valley Power Station, Unit No. 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    Stoffel, J.W.; Udy, A.C.

    1985-11-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97 for Unit No. 2 of the Beaver Valley Power Station and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified

  17. 31 CFR 1.6 - Business information.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Business information. 1.6 Section 1.6... Information Act § 1.6 Business information. (a) In general. Business information provided to the Department of the Treasury by a business submitter shall not be disclosed pursuant to a Freedom of Information Act...

  18. 75 FR 52940 - Science Advisory Board Staff Office; Notification of a Public Meeting of the Chartered Science...

    Science.gov (United States)

    2010-08-30

    ... should be supplied to the DFO in the following formats: One hard copy with original signature and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, MS Word, WordPerfect, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are asked to provide electronic...

  19. 75 FR 1381 - Science Advisory Board Staff Office; Notification of a Public Teleconference of the Clean Air...

    Science.gov (United States)

    2010-01-11

    ... supplied to the DFO in the following formats: one hard copy with original signature and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, MS Word, WordPerfect, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are asked to provide versions of each...

  20. 75 FR 4816 - Science Advisory Board Staff Office; Notification of Two Public Teleconferences of the Chartered...

    Science.gov (United States)

    2010-01-29

    ... statements should be supplied to the DFO in the following formats: one hard copy with original signature, and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are asked to provide...

  1. 75 FR 62386 - Science Advisory Board Staff Office; Notification of Two Public Teleconferences of the Science...

    Science.gov (United States)

    2010-10-08

    .... Written statements should be supplied to the DFO in the following formats: one hard copy with original signature, and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are asked to...

  2. 76 FR 16769 - Science Advisory Board Staff Office; Notification of a Public Meeting of the Science Advisory...

    Science.gov (United States)

    2011-03-25

    ... statements should be supplied to the DFO in the following formats: One hard copy with original signature and one electronic copy via e-mail (acceptable file format: Adobe Acrobat PDF, WordPerfect, MS Word, MS PowerPoint, or Rich Text files in IBM-PC/Windows 98/2000/XP format). Submitters are requested to provide...

  3. ORION - the OMEGA Remote Interactive On-line System

    CERN Document Server

    Russell, R D; Krieger, M

    1973-01-01

    ORION is a system which permits the manipulation of files, records and characters, remote job submittal and retrieval of output files including the direct loading of remote on-line computers. The system uses the computer hardware of the OMEGA project at CERN, and is designed to assist researchers in development and debugging of their programs.

  4. 77 FR 39425 - Approval and Promulgation of Implementation Plans; Louisiana; Regional Haze State Implementation...

    Science.gov (United States)

    2012-07-03

    ... the LA RH SIP submittal will trigger the ``two year sanction clock'' imposed by the CAA. The State... remainder of LA's RH SIP triggers a two-year FIP clock,\\7\\ but does not start a sanctions clock for... progress calculation, LTS, or RPGs, the EPA has no rational basis to determine that the Transport Rule...

  5. 31 CFR 356.21 - How are awards at the high yield or discount rate calculated?

    Science.gov (United States)

    2010-07-01

    ... discount rate calculated? 356.21 Section 356.21 Money and Finance: Treasury Regulations Relating to Money... high yield or discount rate calculated? (a) Awards to submitters. We generally prorate bids at the highest accepted yield or discount rate under § 356.20(a)(2) of this part. For example, if 80.15% is the...

  6. Agricultural Communities: The Interrelationship of Agriculture, Business, Industry, and Government in the Rural Economy. A Symposium (Washington, DC. May 19-20, 1983).

    Science.gov (United States)

    Library of Congress, Washington, DC. Congressional Research Service.

    Experts from government, academia, and interest groups met to discuss and explore the impact of changes in agriculture, industry, and government in shaping events in rural agricultural communities. Texts of 15 of the 18 papers are reproduced in the proceedings, along with the letter of submittal, overview, an agenda, and a list of presenters and…

  7. 76 FR 36329 - Approval and Promulgation of Implementation Plans; State of Idaho; Regional Haze State...

    Science.gov (United States)

    2011-06-22

    ... Tier II Operating Permit No. T2-2009-0105, that was included in the Idaho Regional Haze SIP submittal... correctly used dispersion modeling. See 76 FR 1585 and EPA's evaluation of WRAP modeling in EPA's WRAP TSD... which BART eligible sources are subject to BART. EPA's evaluation of BART modeling can be found in the...

  8. Registration of Hanford Site Class V underground injection wells

    International Nuclear Information System (INIS)

    1988-05-01

    This document was requested by the Washington State Department of Ecology. Based on the State Underground Injection Control Program, as described in the Washington Administrative Code, French drains and reverse wells are being registered as Class V wells. Information on out-of-service French drains, out-of-service reverse wells, and out-of-service cribs that are deeper than their largest surface dimension is also provided. The data for this submittal were taken from the Waste Information Database System (WIDS) and the Hanford Environmental Compliance Record (HECR) database. The current definition used in WIDS for an ''inactive facility'' is one that either no longer receives waste or plans to in the future. The facilities listed in WIDS as inactive have all been listed as ''out-of-service.'' Information concerning the deactivation method for a facility is included when such information is available. The French drains registered in this submittal are based on the information available at the present time. Additional French drains may be registered on a periodic basis as the drains are identified

  9. submitter Development of the readout for the IBL upgrade project of the ATLAS Pixel Detector

    CERN Document Server

    Krieger, Nina

    The LHC luminosity is upgraded in several phases until 2022. The resulting higher occupancy degrades the detector performance of the current Pixel Detector. To provide a good performance during the LHC luminosity upgrade, a fourth pixel layer is inserted into the existing ATLAS Pixel Detector. A new FE-I4 readout chip and a new data acquisition chain are required to cope with the higher track rate and the resulting increased bandwidth. Among others, this includes a new readout board: the IBL ROD. One component of this board is the DSP which creates commands for the FE-I4 chip and has to be upgraded as well. In this thesis, the first tests of the IBL ROD prototype are presented. A correct communication of the DSP to its external memory is verified. Moreover, the implementations for an IBL DSP code are described and tested. This includes the first configuration of the FE-I4 with an IBL ROD. In addition, a working communication with the Histogrammer SDRAM and the Input FIFO on the IBL ROD are demonstrated.

  10. submitter On Roebel Cable Geometry for Accelerator Magnet

    CERN Document Server

    Fleiter, J; Ballarino, A

    2016-01-01

    Roebel-type cables made of a ReBCO conductor are potential candidates for high-field accelerator magnets. The necessity to promote a large effective transverse section in a Roebel cable to avoid local overstress leading to degradation in electrical performance has been recently addressed. In this paper, a new geometry of meander tapes for a Roebel cable that enhances both the transverse effective section and the current margin at crossing segments is discussed. As Roebel cables are bent at the coil ends, the modulation of the bending radius of strands along the cable pitch leads to a shift of the strands with respect to each other. The shift magnitude is analytically investigated in this paper as a function of both cable features and coil geometry. Finally, the minimum transposition pitch of Roebel cables is determined on the basis of coil characteristics.

  11. submitter Towards REBCO 20T+ dipoles for accelerators

    CERN Document Server

    van Nugteren, Jeroen; Murtomäki, Jaakko; DeRijk, Gijs; Rossi, Lucio; Stenvall, Antti

    2018-01-01

    ReBCO high temperature superconducting (HTS) coated conductor tapes are a promising candidate for pushing the magnetic fields in accelerator magnets well beyond 20 T. They are capable of very high current densities in intense applied magnetic field, have a very high thermal stability, can withstand high transverse pressures and allow operation in 20–30 K helium gas flow, potentially reducing operating cost significantly. During the EuCARD2 program, significant developments have been made in terms of coil design, manufacturing, and testing. Now that EuCARD2 has come to an end, CERN and collaborators are initiating a new program to continue the development of HTS accelerator magnets. This paper presents our initial thoughts on the conceptual design of a 20 T+ accelerator magnet, using the results and technologies from EuCARD2 combined with some new ideas. The paper discusses the options available for the cross-sectional layout, the use of a hybrid configurations, including Aligned Block, the design of the coi...

  12. DCS Terrain Submittal for Thomas County, Georgia, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  13. DCS Terrain Submittal for Sumter County, Georgia, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  14. submitter Time-dependent CP violation in charm mesons

    CERN Document Server

    Inguglia, Gianluca

    CP violation is a well established phenomenon for B and K mesons, but for D0 mesons, bound states made up of a quark-antiquark pair containing a charm quark, a conclusive answer to the question whether there is CP vio- lation or not, has yet to be determined. I show here the phenomenology of time-dependent CP asymmetries in charm decays, and discuss the implica- tions of experimental tests aimed at the measurement of CP violation in the interference between mixing and decays of charm mesons, in particular when studying the decay channels D0 ! h+h (h = K; ). The decay channels considered can also be used to constrain quantities that are poorly measured or still to be investigated, such as MIX and c;eff , provided that the e ects of penguin pollution are ignored. I considered correlated production of D0 mesons at the SuperB experiment and its planned asymmetric run at the charm threshold and performed a study of simulated events, nding that a boost factor = 0:28 would not be su cient to produce competitive re- ...

  15. DCS Hydraulics Submittal, Otero County, New Mexico, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydraulics data includes spatial datasets and data tables necessary for documenting the hydraulic procedures for computing flood elevations for a flood insurance...

  16. DCS Terrain Submittal for Dougherty County, Georgia, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  17. DCS Terrain Submittal for Lamar County, Georgia, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  18. DCS Terrain Submittal for Washita County, Oklahoma, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describes the digital topographic data that was used to create...

  19. DCS Terrain Submittal for Pike County, Georgia, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  20. submitter Introduction to Collective Effects in Particle Accelerators

    CERN Document Server

    Zimmermann, Frank

    2016-01-01

    The beam intensity and the beam brightness of particle accelerators or colliders operated for high - energy physics were, and are, often severely limited by “collective effects” (e.g.[1]). By contrast, new light sources, such as linac - based free electron lasers, may even rely on collective instabilities to accomplish their mission! The term “collective effects” refers to the interaction of beam particles with each other through a variety of processes, e.g. (1) non-delayed self-fields and image fields present even for constant perfectly conducting and magnetic boundaries (direct and indirect “space - charge effects”), (2) longer - lived electro-magnetic “wake fields” due to a finite chamber resistivity or geometric variation in the beam - pipe cross section, which typically affect later parts of the beam, (3) coherent synchrotron radiation, which on a curved trajectory may even influence earlier parts of the beam, giving rise to “non-causal” wake fields, otherwise not normally encountered...

  1. DCS Hydrology Submittal, Bernalillo County, New Mexico, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydrology data include spatial datasets and data tables necessary for documenting the hydrologic procedures for estimating flood discharges for a flood insurance...

  2. DCS Terrain Submittal for Harmon County, Oklahoma, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describes the digital topographic data that was used to create...

  3. 40 CFR 52.570 - Identification of plan.

    Science.gov (United States)

    2010-07-01

    ... information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov... conditions 16 through 23 and Attachment A 11/15/94 3/18/99, 64 FR 13348 Owens-Brockway Glass Container, Inc... nonattainment area State submittal date/effective date EPA approval date 1. High Occupancy Vehicle (HOV) lane on...

  4. 75 FR 81874 - Action To Ensure Authority To Issue Permits Under the Prevention of Significant Deterioration...

    Science.gov (United States)

    2010-12-29

    ... final rulemaking for what we call the GHG PSD SIP call or, simply, the SIP call,\\2\\ as well as in what...- emitting sources. These actions include what we call the Endangerment Finding,\\4\\ the Light-Duty Vehicle... for PSD SIP submittal. Thus, Executive Order 13132 does not apply to this action. In the spirit of...

  5. Earth Observing System (EOS) Advanced Microwave Sounding Unit-A2 (EOS/AMSU-A): EOS Software Test Report

    Science.gov (United States)

    1998-01-01

    This document describes the results of the formal qualification test (FQT)/ Demonstration conducted on September 10, and 14, 1998 for the EOS AMSU-A2 instrument. The purpose of the report is to relate the results of the functional performance and interface tests of the software. This is the final submittal of the EOS/AMSU-A Software Test report.

  6. Conformance to Regulatory Guide 1.97, Joseph M. Farley Nuclear Plant, Unit Nos. 1 and 2 (Docket No. 50-348 and 50-364)

    International Nuclear Information System (INIS)

    Stoffel, J.W.

    1985-05-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97 for Unit Nos. 1 and 2 of the Joseph M. Farley Nuclear Plant and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified

  7. 10 CFR 13.26 - Filing and service of papers.

    Science.gov (United States)

    2010-01-01

    ... found in the E-Filing Guidance and on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html... electronically to the E-Filing system. In addition, optical storage media (OSM) containing the entire filing must... document (e.g., motion to quash subpoena). (6) Filing is complete when the filer performs the last act that...

  8. 77 FR 7028 - Changes To Implement Derivation Proceedings

    Science.gov (United States)

    2012-02-10

    ... submitter does not desire to make public, such as an address or phone number, should not be included in the... will not be able to obtain a patent for the invention that he did not actually invent. If a dispute... named inventor in the earlier application derived the claimed invention from an inventor named in the...

  9. ORION-the Omega Remote Interactive On-line System

    CERN Document Server

    Russell, R D; Levratt, B; Lipps, H; Sparrman, P

    1974-01-01

    ORION is a system which permits the manipulation of files, records and characters, remote job submittal and retrieval of output files including the direct loading of remote on-line computers. The system uses the computer hardware of the OMEGA project at CERN and is designed to assist researchers in development and debugging of their programs. (10 refs).

  10. Conformance to Regulatory Guide 1.97 Slurry Power Station, Unit Nos. 1 and 2 (Docket Nos. 50-280 and 50-281)

    International Nuclear Information System (INIS)

    Stoffel, J.W.

    1985-09-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97, Revision 3, for Unit Nos. 1 and 2 of the Surry Power Station and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified

  11. submitter Estimation of stepping motor current from long distances through cable-length-adaptive piecewise affine virtual sensor

    CERN Document Server

    Oliveri, Alberto; Masi, Alessandro; Storace, Marco

    2015-01-01

    In this paper a piecewise affine virtual sensor is used for the estimation of the motor-side current of hybrid stepper motors, which actuate the LHC (Large Hadron Collider) collimators at CERN. The estimation is performed starting from measurements of the current in the driver, which is connected to the motor by a long cable (up to 720 m). The measured current is therefore affected by noise and ringing phenomena. The proposed method does not require a model of the cable, since it is only based on measured data and can be used with cables of different length. A circuit architecture suitable for FPGA implementation has been designed and the effects of fixed point representation of data are analyzed.

  12. Software requirements

    CERN Document Server

    Wiegers, Karl E

    2003-01-01

    Without formal, verifiable software requirements-and an effective system for managing them-the programs that developers think they've agreed to build often will not be the same products their customers are expecting. In SOFTWARE REQUIREMENTS, Second Edition, requirements engineering authority Karl Wiegers amplifies the best practices presented in his original award-winning text?now a mainstay for anyone participating in the software development process. In this book, you'll discover effective techniques for managing the requirements engineering process all the way through the development cy

  13. Post-Closure Inspection and Monitoring Report for the Salmon, Mississippi, Site Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    This report summarizes inspection and monitoring activities performed on and near the Salmon, Mississippi, Site in calendar year 2007. The Draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report is submitted to comply with that requirement. The Tatum Salt Dome was used by the U.S. Atomic Energy Commission (AEC) for underground nuclear testing during the cold war. The land surface above the salt dome, the Salmon Site, is located in Lamar County, Mississippi, approximately 12 miles west of Purvis (Figure 1). The U.S. Department of Energy (DOE), the successor to the AEC, is responsible for long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned this responsibility effective October 2006

  14. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-10-01

    This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

  15. Nuclear security personnel for power plants. Content and review procedures for a security training and qualification program

    International Nuclear Information System (INIS)

    1978-06-01

    The applicant and licensee training and qualification plans will outline the process by which guard, watchman, armed response persons and other members of the security organization will be selected, trained, equipped and qualified. This plan should contain: (1) job descriptions for all security positions; (2) duties defined for all positions; (3) critical tasks defined for all duties; (4) skills, knowledge and abilities defined for all critical tasks; (5) performance objectives stated for all critical tasks; and (6) training and qualification plans to train and test to appropriate performance objectives. The document gives guidance on the preparation of this training and qualification plan and contains three parts: (1) an introduction to and brief explanation of job analysis and performance objectives; (2) a statement of the information that should be submitted in response to the requirements and the NRR review procedures; and (3) a sample qualification submittal

  16. On-Line Monitoring of Instrument Channel Performance: Volume 3: Applications to Nuclear Power Plant Technical Specification Instrumentation

    International Nuclear Information System (INIS)

    Davis, E.; Rasmussen, B.

    2004-01-01

    This report is a guide for a technical specification change submittal and subsequent implementation of on-line monitoring for safety-related applications. This report is the third in a three-volume set. Volume 1, ''Guidelines for Model Development and Implementation'', presents the various tasks that must be completed to prepare models for and to implement an on-line monitoring system

  17. Conformance to Generic Letter 83-28, Items 3.1.3 and 3.2.3, Beaver Valley, Unit No. 1, North Anna, Unit Nos. 1 and 2, Surry Unit Nos. 1 and 2 (Docket Nos. 50-334, 50-338, 50-339, 50-280, and 50-281)

    International Nuclear Information System (INIS)

    Haroldsen, R.

    1985-09-01

    This report provides a review of the submittals for Beaver Valley, Unit No. 1, North Anna, Unit Nos. 1 and 2, and Surry, Unit Nos. 1 and 2, for conformance to Generic Letter 83-28, Items 3.1.3 and 3.2.3. The specific plants selected were reviewed as a group because of similarity in type and applicability of review items

  18. Conformance to Regulatory Guide 1.97, Shearon Harris Nuclear Power Plant, Unit Nos. 1 and 2 (Docket Nos. 50-400 and 50-401)

    International Nuclear Information System (INIS)

    Stoffel, J.W.

    1985-09-01

    This EG and G Idaho, Inc. report reviews the submittals for Regulatory Guide 1.97, Revision 3, for Unit Nos. 1 and 2 of the Shearon Harris Nuclear Power Plant and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified. 7 refs

  19. Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A): Instrumentation interface control document

    Science.gov (United States)

    1994-01-01

    This Interface Control Document (ICD) defines the specific details of the complete accomodation information between the Earth Observing System (EOS) PM Spacecraft and the Advanced Microwave Sounding Unit (AMSU-A)Instrument. This is the first submittal of the ICN: it will be updated periodically throughout the life of the program. The next update is planned prior to Critical Design Review (CDR).

  20. Conformance to Regulatory Guide 1.97 Browns Ferry Nuclear Plant, Unit Nos. 1, 2 and 3 (Docket Nos. 50-259, 50-260, and 50-296)

    International Nuclear Information System (INIS)

    Udy, A.C.

    1985-07-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97, Revision 3, for Unit Nos. 1, 2 and 3 of the Browns Ferry Nuclear Plant and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified

  1. Microinvertebrates in CELSS Hydroponic Rhizosphere: Experimental Invasion as a Test of Community Stability and a Test of a Method to Measure Bacterivory

    Science.gov (United States)

    Sager, John; Garland, Jay; Jenkins, David G.

    1996-01-01

    This report consists of two separate draft manuscripts, each prepared for submittal to a peer-reviewed journal after Kennedy Space Center (KSC) colleague editorial review and final revision. References for the two papers have been combined in this report. The two manuscripts are: (1) Experimental invasion of aquatic rhizosphere habitat and invertebrate communities, and (2) Lysozyme analysis is neither protistan- or bacteriore-specific.

  2. Anticipating requirements changes-using futurology in requirements elicitation

    OpenAIRE

    Pimentel, João Henrique; Santos, Emanuel; Castro, Jaelson; Franch Gutiérrez, Javier

    2012-01-01

    It is well known that requirements changes in a later phase of software developments is a major source of software defects and costs. Thus, the need of techniques to control or reduce the amount of changes during software development projects. The authors advocate the use of foresight methods as a valuable input to requirements elicitation, with the potential to decrease the number of changes that would be required after deployment, by anticipating them. In this paper, the authors define a pr...

  3. submitter Commissioning of the Silicon Pixel Detector of ALICE and perspectives for beauty production at LHC

    CERN Document Server

    Bombonati, Carlo

    The activities carried out within the present work were aimed at the preparation for heavy quarks measurements, thus including the construction and commissioning of the SPD. More in detail, they can be summarised in the following: • Assembly of the silicon pixel sensors on the carbon fibre support. Given its role as a precision tracker, the assembly of the SPD requires the use of specific procedures to ensure a high degree of accuracy. • Tuning and maintenance of the cooling system of the SPD. The SPD power dissipation is of about 1.5 kW. This means that, without cooling, the temperature of the sensors would rise at about 1°C/s. The cooling system is thus of vital importance for the operation of the detector. • Development of a set of tools for the monitoring of the alignment procedures of the ITS and, in particular of the SPD. The misalignment of the detector must be accounted for in the software description of the geometry in order to optimize the spatial resolution. The matching of the geometry with...

  4. submitter Quench Protection of Very Large, 50-GJ-Class, and High-Temperature-Superconductor-Based Detector Magnets

    CERN Document Server

    Mentink, Matthias; Mulder, Tim; Van Nugteren, Jeroen; ten Kate, Herman

    2016-01-01

    An investigation is performed on the quench behavior of a conceptual 50-GJ 8-T high-temperature-superconductor-based solenoid. In this design, a 50-kA conductor-on-round-core cable-in-conduit conductor utilizing ReBCO technology is envisioned, operating at 40 K. Various properties such as resistivity, thermal conductivity, and heat capacity are very different at this temperature, which affects the quench behavior. It is found that the envisioned conductor is very stable with a minimum quench energy of about 2 kJ. However, the quench propagation velocity is typically about 20 mm/s, so that creating a wide-spread normal zone throughout the coil is very challenging. Moreover, an extraction voltage exceeding 20 kV would be required to ensure a hot-spot temperature below 100 K once a thermal runaway occurs. A novel concept dubbed “rapid quench transformation” is proposed whereby the superconducting conductor is co-wound with a normal conductor to achieve a high degree of inductive coupling. This geometry allow...

  5. submitter Digital Image Correlation of 2D X-ray Powder Diffraction Data for Lattice Strain Evaluation

    CERN Document Server

    Zhang, Hongjia; Salvati, Enrico; Daisenberger, Dominik; Lunt, Alexander J G; Fong, Kai Soon; Song, Xu; Korsunsky, Alexander M

    2018-01-01

    High energy 2D X-ray powder diffraction experiments are widely used for lattice strain measurement. The 2D to 1D conversion of diffraction patterns is a necessary step used to prepare the data for full pattern refinement, but is inefficient when only peak centre position information is required for lattice strain evaluation. The multi-step conversion process is likely to lead to increased errors associated with the ‘caking’ (radial binning) or fitting procedures. A new method is proposed here that relies on direct Digital Image Correlation analysis of 2D X-ray powder diffraction patterns (XRD-DIC, for short). As an example of using XRD-DIC, residual strain values along the central line in a Mg AZ31B alloy bar after 3-point bending are calculated by using both XRD-DIC and the conventional ‘caking’ with fitting procedures. Comparison of the results for strain values in different azimuthal angles demonstrates excellent agreement between the two methods. The principal strains and directions are calculated...

  6. Westinghouse Advances in Passive Plant Safety

    International Nuclear Information System (INIS)

    Bruschi, H. J.; Manager, General; Gerstenhaber, E.

    1993-01-01

    On June 26, 1992, Westinghouse submitted the Ap600 Standard Safety Analysis Report and comprehensive PIRA results to the U. S. NRC for review as part of the Ap600 design certification program. This major milestone was met on time on a schedule set more than 3 years before submittal and is the result of the cooperative efforts of the U. S. Department of Energy (DOE), the Electric Power Requirements Program, and the Westinghouse Ap600 design team. These efforts were initiated in 1985 to develop a 600 MW advanced light water reactor plant design based on specific technical requirements established to provide the safety, simplicity, reliability, and economics necessary for the next generation of nuclear power plants. The Ap600 design achieves the ALRR safety requirements through ample design margins, simplified safety systems based on natural driving forces, and on a human-engineered man-machine interface system. Extensive Probabilistic Risk evolution, have recently shown that even if none of the active defense-in-depth safety systems are available, the passive systems alone meet safety goals. Furthermore, many tests in an extensive test program have begun or have been completed. Early tests show that passive safety perform well and meet design expectations

  7. Development of a PSA-based Loss of Large Area Analysis Method

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Mee Jeong; Jung, Woosik [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Myungsu [Korea Hydro Nuclear Power, Central Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    As a result of these initial post 9-11 assessments in 2002, the NRC issued an interim safeguards and security compensatory measures order. In 'Interim Compensatory Measures for High Threat Environment,'. Section B.5.b (not publically available) of this order, current NPP licensees had to adopt mitigation or restore reactor core cooling, containment, and spent fuel pool (SFP) cooling capabilities to cope with a LOLA due to large fires and explosions from any cause, including beyond-design basis threat(BDBT) aircraft impacts. In 2009, the NRC issued amendments to 10CFR Part 52, and Part 73 for power reactor security requirements for operating and new reactors. New U.S. licensed commercial nuclear power plant operators are required to provide a LOLA(Loss of Large Area) analysis as per the U.S. Code of Federal Regulations, 10CFR50.54(hh)(2). Additionally 10CFR52.80(d) provides the required submittal information on how an applicant for a combined operating license(COL) for a nuclear power plant to meet these requirements. It is necessary to prepare our own guidance for a development of LOLA strategies. In this paper, we proposed a method to look for interesting combinations of rooms in certain targets getting through VAI model, and produced insights that could be used to influence LOLA strategies.

  8. Capturing Requirements for Autonomous Spacecraft with Autonomy Requirements Engineering

    Science.gov (United States)

    Vassev, Emil; Hinchey, Mike

    2014-08-01

    The Autonomy Requirements Engineering (ARE) approach has been developed by Lero - the Irish Software Engineering Research Center within the mandate of a joint project with ESA, the European Space Agency. The approach is intended to help engineers develop missions for unmanned exploration, often with limited or no human control. Such robotics space missions rely on the most recent advances in automation and robotic technologies where autonomy and autonomic computing principles drive the design and implementation of unmanned spacecraft [1]. To tackle the integration and promotion of autonomy in software-intensive systems, ARE combines generic autonomy requirements (GAR) with goal-oriented requirements engineering (GORE). Using this approach, software engineers can determine what autonomic features to develop for a particular system (e.g., a space mission) as well as what artifacts that process might generate (e.g., goals models, requirements specification, etc.). The inputs required by this approach are the mission goals and the domain-specific GAR reflecting specifics of the mission class (e.g., interplanetary missions).

  9. Tool-based requirement traceability between requirement and design artifacts

    CERN Document Server

    Turban, Bernhard

    2013-01-01

    Processes for developing safety-critical systems impose special demands on ensuring requirements traceability. Achieving valuable traceability information, however, is especially difficult concerning the transition from requirements to design. Bernhard Turban analyzes systems and software engineering theories cross-cutting the issue (embedded systems development, systems engineering, software engineering, requirements engineering and management, design theory and processes for safety-critical systems). As a solution, the author proposes a new tool approach to support designers in their thinkin

  10. Remedial action and waste disposal project -- 100-DR-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    April, J.G.; Ard, J.A.; Corpuz, F.M.; DeMers, S.K.; Donahoe, R.L.; Frank, J.M.; Hobbs, B.J.; Roeck, F.V.

    1997-02-01

    This readiness assessment report presents the results of the project readiness assessment for the 100-DR-1 source sites remediation. The assessment was conducted at the conclusion of a series of project activities that began in August 1996. These activities included confirming the completion of project-specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, and mobilization and construction of site support systems

  11. Beta-delayed proton activities: 147Dy and 149Er

    International Nuclear Information System (INIS)

    Toth, K.S.; Moltz, D.M.; Schloemer, E.C.; Cable, M.D.; Avignone, F.T. III; Ellis-Akovali, Y.A.

    1984-01-01

    The present paper discusses mainly the β-delayed proton spectra of 147 Dy and of the hitherto unknown isotope, 149 Er. However, following the submittal of the abstract for this conference we have now observed delayed protons following the decay of 145 Dy. Additionally, we have identified a 0.5-s delayed-proton emitter and tentatively assign it to the new isotope, 151 Yb

  12. ON-Line Monitoring of Instrument Channel Performance: Volume 3: Applications to Nuclear Power Plant Technical Specification Instrumentation

    Energy Technology Data Exchange (ETDEWEB)

    E Davis, B Rasmussen

    2004-12-31

    This report is a guide for a technical specification change submittal and subsequent implementation of on-line monitoring for safety-related applications. This report is the third in a three-volume set. Volume 1, ''Guidelines for Model Development and Implementation'', presents the various tasks that must be completed to prepare models for and to implement an on-line monitoring system.

  13. Authorization Basis Safety Classification of Transfer Bay Bridge Crane at the 105-K Basins

    International Nuclear Information System (INIS)

    CHAFFEE, G.A.

    2000-01-01

    This supporting document provides the bases for the safety classification for the K Basin transfer bay bridge crane and the bases for the Structures, Systems, and Components (SSC) safety classification. A table is presented that delineates the safety significant components. This safety classification is based on a review of the Authorization Basis (AB). This Authorization Basis review was performed regarding AB and design baseline issues. The primary issues are: (1) What is the AB for the safety classification of the transfer bay bridge crane? (2) What does the SSC safety classification ''Safety Significant'' or ''Safety Significant for Design Only'' mean for design requirements and quality requirements for procurement, installation and maintenance (including replacement of parts) activities for the crane during its expected life time? The AB information on the crane was identified based on review of Department of Energy--Richland Office (RL) and Spent Nuclear Fuel (SNF) Project correspondence, K Basin Safety Analysis Report (SAR) and RL Safety Evaluation Reports (SERs) of SNF Project SAR submittals. The relevant correspondence, actions and activities taken and substantive directions or conclusions of these documents are provided in Appendix A

  14. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1

    International Nuclear Information System (INIS)

    1995-01-01

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals

  15. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-31

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

  16. Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 90, Area 2 Bitcutter Containment, is identified in the ''Federal Facility Agreement and Consent Order'' of 1996. The post-closure requirements for CAU 90 are described in Section VII.B.8.b of the Nevada Test Site ''Resource Conservation and Recovery Act'' Permit for a Hazardous Waste Management Facility Number NEV HW0021, dated November 2005. Post-closure activities consist of the following: Semiannual inspections of the site using inspection checklists; Photographic documentation; Field note documentation; and Preparation and submittal of an annual Post-Closure Inspection Report. This annual report covers the period of July 2006 to June 2007 and consists of a summary of the results of the inspections, copies of the inspection checklists and field notes, maintenance and repair records (if any), photographs, and conclusions and recommendations. The inspection checklists are provided in Appendix A, a copy of the field notes is provided in Appendix B, and copies of photographs taken during the inspections are provided in Appendix C

  17. Reactor pressure vessel status report

    International Nuclear Information System (INIS)

    Strosnider, J.; Wichman, K.; Elliot, B.

    1994-12-01

    This report gives a brief description of the reactor pressure vessel (RPV), followed by a discussion of the radiation embrittlement of RPV beltline materials and the two indicators for measuring embrittlement, the end-of-license (EOL) reference temperature and the EOL upper-shelf energy. It also summarizes the GL 92-01 effort and presents, for all 37 boiling water reactor plants and 74 pressurized water reactor plants in the United States, the current status of compliance with regulatory requirements related to ensuring RPV integrity. The staff has evaluated the material data needed to predict neutron embrittlement of the reactor vessel beltline materials. These data will be stored in a computer database entitled the reactor vessel integrity database (RVID). This database will be updated annually to reflect the changes made by the licensees in future submittals and will be used by the NRC staff to assess the issues related to vessel structural integrity

  18. Environmental Requirements Management

    Energy Technology Data Exchange (ETDEWEB)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  19. submitter Electromagnetic Study of a Round Coil Superferric Magnet

    CERN Document Server

    Volpini, Giovanni; Statera, Marco

    2016-01-01

    A novel type of superferric magnets suitable to arbitrary multipole orders was proposed by I. F. Malyshev and later by V. Kashikhin. This new topology, which we refer to as round coil superferric magnets (RCSM), allows a great simplification of the superconducting part, which in the simplest case may be composed by a single round coil, which has intrinsically a rather large bending radius allowing the use of strain-sensitive superconductors. INFN is designing and building a prototype of a multipolar corrector magnet based on this geometry and using MgB2 tapes. In this paper, we investigate a number of issues pertaining to the electromagnetic characteristics of RCSM. The RCSM magnetic has inherently even harmonics, in addition to usual odd ones and a solenoidal component. Either (but not both) disappears when integrated using a one-coil or a two-coil specular design. We investigate the effect of saturation on the multipolar components and on the load line, since in RCSM, saturation plays a role that differs bo...

  20. 40 CFR 70.4 - State program submittals and transition.

    Science.gov (United States)

    2010-07-01

    ... description in narrative form of the scope, structure, coverage, and processes of the State program. (ii) A description of the organization and structure of the agency or agencies that will have responsibility for... strategies). (5) A complete description of the State's compliance tracking and enforcement program or...

  1. submitter Data-driven RBE parameterization for helium ion beams

    CERN Document Server

    Mairani, A; Dokic, I; Valle, S M; Tessonnier, T; Galm, R; Ciocca, M; Parodi, K; Ferrari, A; Jäkel, O; Haberer, T; Pedroni, P; Böhlen, T T

    2016-01-01

    Helium ion beams are expected to be available again in the near future for clinical use. A suitable formalism to obtain relative biological effectiveness (RBE) values for treatment planning (TP) studies is needed. In this work we developed a data-driven RBE parameterization based on published in vitro experimental values. The RBE parameterization has been developed within the framework of the linear-quadratic (LQ) model as a function of the helium linear energy transfer (LET), dose and the tissue specific parameter ${{(\\alpha /\\beta )}_{\\text{ph}}}$ of the LQ model for the reference radiation. Analytic expressions are provided, derived from the collected database, describing the $\\text{RB}{{\\text{E}}_{\\alpha}}={{\\alpha}_{\\text{He}}}/{{\\alpha}_{\\text{ph}}}$ and ${{\\text{R}}_{\\beta}}={{\\beta}_{\\text{He}}}/{{\\beta}_{\\text{ph}}}$ ratios as a function of LET. Calculated RBE values at 2 Gy photon dose and at 10% survival ($\\text{RB}{{\\text{E}}_{10}}$ ) are compared with the experimental ones. Pearson's correlati...

  2. National Emission Standards for Hazardous Air Pollutants submittal -- 1994

    International Nuclear Information System (INIS)

    Townsend, Y.E.; Black, S.C.

    1995-06-01

    This report focuses on air quality at the Nevada Test Site (NTS) for 1994. A general description of the effluent sources are presented. Each potential source of NTS emissions was characterized by one of the following: (1) by monitoring methods and procedures previously developed at NTS; (2) by a yearly radionuclide inventory of the source, assuming that volatile radionuclides are released to the environment; (3) by the measurement of tritiated water concentration in liquid effluents discharged to containment ponds and assuming all the effluent evaporates over the course of the year to become an air emission; or (4) by using a combination of environmental measurements and CAP88-PC to calculate emissions. Appendices A through J describe the methods used to determine the emissions from the sources. These National Emission Standards for Hazardous Air Pollutants (NESHAP) emissions are very conservative, are used to calculate the effective dose equivalent to the Maximally Exposed Individual offsite, and exceed, in some cases, those reported in DOE's Effluent Information System (EIS). The NESHAP's worst-case emissions that exceed the EIS reported emissions are noted. Offsite environmental surveillance data are used to confirm that calculated emissions are, indeed, conservative

  3. National emission standards for hazardous air pollutants submittal - 1996

    International Nuclear Information System (INIS)

    Townsend, Y.E.; Black, S.C.

    1997-06-01

    The Nevada Test Site (NTS) is operated by the US Department of Energy, Nevada Operations Office (DOE/NV) as the site for nuclear weapons testing. Monitoring and evaluation of the various activities conducted onsite indicate that the potential sources of offsite radiation exposure in 1996 were releases from the following: evaporation of tritiated water from containment ponds that receive drainage from E tunnel and from wells used for site characterization studies; onsite radioanalytical laboratories; the Area 5 RWMS facility; and diffuse sources of tritium and resuspension of plutonium. Section 1 describes these sources on the NTS. Section 2 tabulates the air emissions data for the NTS. These data are used to calculate the effective dose equivalents to offsite residents. Appendices describe the methods used to determine the emissions from the sources listed

  4. National Emission Standards for Hazardous Air Pollutants submittal - 1997

    International Nuclear Information System (INIS)

    Townsend, Y.E.; Black, S.C.

    1998-06-01

    Each potential source of Nevada Test Site (NTS) emissions was characterized by one of the following methods: (1) monitoring methods and procedures previously developed at the NTS; (2) a yearly radionuclide inventory of the source, assuming that volatile radionuclide are released to the environment; (3) the measurement of tritiated water (as HTO or T 2 O) concentration in liquid effluents discharged to containment ponds and assuming all the effluent evaporates over the course of the year to become an air emission; or (4) using a combination of environmental measurements and CAP88-PC to calculate emissions. The emissions for National Emission Standards for Hazardous Air Pollutants (NESHAPs) reporting are listed. They are very conservative and are used in Section 3 to calculate the EDE to the maximally exposed individual offsite. Offsite environmental surveillance data, where available, are used to confirm that calculated emissions are, indeed, conservative

  5. Feed tank transfer requirements

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.

    1998-01-01

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B

  6. IRIS Licensing Status

    International Nuclear Information System (INIS)

    Kling, Charles L.; Carelli, Mario D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) nuclear power plant is well into the pre-application review process with the US NRC and has accomplished its first near term goal of obtaining US NRC feedback on the long term testing program. To date, the IRIS team has submitted to the US NRC a number of documents patterned after the Evaluation Model Development and Assessment Process (EMDAP) outlined in Regulatory Guide 1,203. They have covered a detailed description of IRIS, initial safety analysis results, PIRT development for limiting transients, scaling analysis and a description of the test program. The IRIS Safety-by-Desing TM intrinsically eliminates and/or significantly reduces the consequences of traditional LWR accidents. In addition, the fewer passive safety systems are similar in principle to those of the US NRC approved AP1000 design. For these reasons, the IRIS testing program only needs to include those features unique to the IRIS design. NRC feedback was that the planned test program appeared to be complete and could generate sufficient information to support a Design Certification (DC) submittal. The US NRC has also stated that a DC application must include complete information regarding the test program. On this basis the IRIS team has initiated an aggressive program to conduct IRIS testing to support a DC submittal by the end of 2008. Subsequent US NRC review should be expeditious because of the AP1000 precedent, allowing IRIS to obtain its Final Design Approval (FDA) in 2012; thereby, maintaining its goal of deployment in the 2015-2017 time frame. The next steps in the pre-application review process will be to provide the US NRC with a road map of the anticipated IRIS licensing process, a review of current licensing requirements showing that IRIS meets or exceeds all current criteria and information to support the long term goal of redefining the Emergency Planning Zone (EPZ)

  7. Waste management research abstracts no. 16. Information on radioactive waste programmes in progress

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-11-01

    The research abstracts contained in this issue have been collected during recent months ending August 1985. The abstracts reflect research currently in progress in the field of radioactive waste management: environmental impacts, site selection, decontamination and decommissioning, environmental restoration and legal aspects of radioactive waste management. The abstracts have been printed in the language and in the form of submittal and without any changes other than minor editorial ones.

  8. Waste management research abstracts no. 13. Information on research in progress

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-05-01

    The 222 research abstracts contained in this issue have been collected during recent months ending 15 January 1982. The abstracts reflect research currently in progress in the field of radioactive waste management: environmental impacts, site selection, decontamination and decommissioning, environmental restoration and legal aspects of radioactive waste management. The abstracts have been printed in the language and in the form of submittal and without any changes other than minor editorial ones.

  9. Waste management research abstracts no. 16. Information on radioactive waste programmes in progress

    International Nuclear Information System (INIS)

    1985-11-01

    The research abstracts contained in this issue have been collected during recent months ending August 1985. The abstracts reflect research currently in progress in the field of radioactive waste management: environmental impacts, site selection, decontamination and decommissioning, environmental restoration and legal aspects of radioactive waste management. The abstracts have been printed in the language and in the form of submittal and without any changes other than minor editorial ones

  10. Waste management research abstracts no. 13. Information on research in progress

    International Nuclear Information System (INIS)

    1982-05-01

    The 222 research abstracts contained in this issue have been collected during recent months ending 15 January 1982. The abstracts reflect research currently in progress in the field of radioactive waste management: environmental impacts, site selection, decontamination and decommissioning, environmental restoration and legal aspects of radioactive waste management. The abstracts have been printed in the language and in the form of submittal and without any changes other than minor editorial ones

  11. CH2M Hill Hanford Group, Inc., Standards and Requirements Identification Document (SRID) Requirements Management System and Requirements Specification

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    2000-01-01

    The current Tank Farm Contractor (TFC) for the U. S. Department of Energy, Office of River Protection (ORP), River Protection Project (RPP), CH2M Hill Hanford Group, Inc. (CHG), will use a computer based requirements management system. The system will serve as a tool to assist in identifying, capturing, and maintaining the Standards/Requirements Identification Document (S/RID) requirements and links to implementing procedures and other documents. By managing requirements as one integrated set, CHG will be able to carry out its mission more efficiently and effectively. CHG has chosen the Dynamic Object Oriented Requirements System (DOORS(trademark)) as the preferred computer based requirements management system. Accordingly, the S/RID program will use DOORS(trademark). DOORS(trademark) will replace the Environmental Requirements Management Interface (ERMI) system as the tool for S/RID data management. The DOORS(trademark) S/RID test project currently resides on the DOORSTM test server. The S/RID project will be migrated to the DOORS(trademark) production server. After the migration the S/RID project will be considered a production project and will no longer reside on the test server

  12. submitter Direct Drive and Eddy Current Septa Magnet Designs for CERN's PSB Extraction at 2 GeV

    CERN Document Server

    Szoke, Z; Balhan, B; Baud, C; Borburgh, J; Hourican, M; Masson, T; Prost, A

    2016-01-01

    In the framework of the LIU project, new septa magnets have been designed between CERN's PS booster (PSB) extraction and PS injection. The upgraded devices are to deal with the increased beam energy from 1.4 to 2 GeV at extraction of the PSB. The direct drive recombination septa in the PSB transfer line to the PS and the eddy current PS injection septum together with a bumper at injection have been investigated using finite-element software. For the recombination magnets, an increase in magnet length is sufficient to obtain the required deflection; however, for the PS injection elements, a more novel solution is necessary to also achieve increased robustness to extend the expected lifetime of the pulsed device. The injection septum will share the same vacuum vessel with an injection bumper, and both magnets will be located adjacent to each other. The new PS injection magnet will be the first septum operated at CERN based on eddy current technology. The magnetic modeling of the devices, the comparison of the p...

  13. submitter Search for singly produced vector-like down-type quarks in single-lepton final states with ATLAS

    CERN Document Server

    Rehnisch, Laura

    A search for vector-like and excited down-type (Q = 1/3) quarks with the ATLAS detector is presented in this thesis. The existence of these quarks is predicted by various models beyond the Standard Model, motivated by some limitations of that theory. Quarks from two specific models are searched for in single production mode, as this is predicted to yield higher cross-sections than pair production in the investigated mass range. The search focuses on decays of the heavy quarks to a W boson and a top quark, the latter of which subsequently decays almost exclusively into another W boson and a bottom quark. Requiring one of the two W bosons to decay leptonically leads to final states containing exactly one lepton (electron or muon in this case), several jets, one of which can be identified as originating from a bottom quark, and some amount of missing energy in the transverse plane stemming from the neutrino of the leptonic W decay. The reconstructed mass of the heavy quark is used to discriminate between signal ...

  14. Feed tank transfer requirements

    Energy Technology Data Exchange (ETDEWEB)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  15. Feed tank transfer requirements

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.

    1998-01-01

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented

  16. Individual plant examination program: Perspectives on reactor safety and plant performance. Part 6, appendices A, B, and C

    International Nuclear Information System (INIS)

    1997-12-01

    This report provides perspectives gained by reviewing 75 Individual Plant Examination (IPE) submittals pertaining to 108 nuclear power plant units. IPEs are probabilistic analyses that estimate the core damage frequency (CDF) and containment performance for accidents initiated by internal events (including internal flooding, but excluding internal fire). The U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research, reviewed the WE submittals with the objective of gaining perspectives in three major areas: (1) improvements made to individual plants as a result of their IPEs and the collective results of the IPE program, (2) plant-specific design and operational features and modeling assumptions that significantly affect the estimates of CDF and containment performance, and (3) strengths and weaknesses of the models and methods used in the IPEs. These perspectives are gained by assessing the core damage and containment performance results, including overall CDF, accident sequences, dominant contributions to component failure and human error, and containment failure modes. In particular, these results are assessed in relation to the design and operational characteristics of the various reactor and containment types, and by comparing the IPEs to probabilistic risk assessment characteristics. Methods, data, boundary conditions, and assumptions used in the IPEs are considered in understanding the differences and similarities observed among the various types of plants

  17. Transportation System Requirements Document

    International Nuclear Information System (INIS)

    1993-09-01

    This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification

  18. Replacing reserve requirements

    OpenAIRE

    Edward J. Stevens

    1993-01-01

    An examination of the fading significance of the Federal Reserve System's reserve requirements and the recent flowering of required clearing balances, a rapidly growing feature of Reserve Bank operations.

  19. TRANSPORTATION SYSTEM REQUIREMENTS DOCUMENT

    International Nuclear Information System (INIS)

    2004-01-01

    This document establishes the Transportation system requirements for the U.S. Department of Energy's (DOE's) Civilian Radioactive Waste Management System (CRWMS). These requirements are derived from the Civilian Radioactive Waste Management System Requirements Document (CRD). The Transportation System Requirements Document (TSRD) was developed in accordance with LP-3.1Q-OCRWM, Preparation, Review, and Approval of Office of National Transportation Level-2 Baseline Requirements. As illustrated in Figure 1, the TSRD forms a part of the DOE Office of Civilian Radioactive Waste Management (OCRWM) Technical Baseline

  20. Chování účastníků finančního trhu v anomálních situacích

    OpenAIRE

    Hajduček, Tomáš

    2015-01-01

    Thesis deal with recognition rationality behavior participant's money - market in anomalous situations, then in situations at rise capital bubbles in the marketplace plus their disruption. For needs of this work is bubble identified like situation, in which price is deflected by expressive way from its fundamentalism. With the help of analysises buy/sell direction - order on choice markets is surveyed, whether submitters hints act conformable with capital theory (which claims, that the inves-...

  1. Demographic and regional economic modeling using stochastic allocation in the City of Johannesburg

    CSIR Research Space (South Africa)

    Lamprecht, TJ

    2005-11-01

    Full Text Available submittal. Venter, Lamprecht, Badenhorst 10 o Dedensification occurring as a result of government actions to alleviate overpopulation problems in certain areas (a not uncommon issue in developing countries) is captured by specifying a residential... a common understanding of problems and of “the way the world works”. ILLUSTRATIVE APPLICATION: CITY OF JOHANNESBURG The allocation model’s application to the City of Johannesburg provides an illustration of its capabilities. Base year (2001...

  2. Topical report review status

    International Nuclear Information System (INIS)

    1997-08-01

    This report provides industry with procedures for submitting topical reports, guidance on how the U.S. Nuclear Regulatory Commission (NRC) processes and responds to topical report submittals, and an accounting, with review schedules, of all topical reports currently accepted for review schedules, of all topical reports currently accepted for review by the NRC. This report will be published annually. Each sponsoring organization with one or more topical reports accepted for review copies

  3. U. S. Companies leapfrog foreign HDTV technology. [High definition television (HDTV)

    Energy Technology Data Exchange (ETDEWEB)

    Greenberger, L.S.

    1991-02-01

    This article discusses high definition television (HDTV) development and the current leading of the technology by US firms as an unforeseen event. The use of data compression and digital transmission technology is the basis of the recent advance by US firms. The design is briefly discussed and the other manufacturers methods for HDTV are reviewed. The possible response of the FCC to recent submittal revisions to incorporate the new technology is discussed.

  4. Fourth Semiannual Report to the Congress by the United States Atomic Energy Commission, July 1948

    Energy Technology Data Exchange (ETDEWEB)

    Lilienthal, David E.; Bacher, Robert F.; Pike, Sumner T.; Strauss, Lewis L.; Waymack, William W.

    1948-07-01

    The document includes the letter of submittal and the Fourth semiannual report. These reports are called for pursuant to Section 17 of the Atomic Energy Act of 1946. This fourth report incorporates some changes to the report. In order to make these reports of maximum value to Members of Congress, the Commission has prepared this mid-year report as a specialized document giving a comprehensive account of several major phases of the atomic energy program.

  5. Closure requirements

    International Nuclear Information System (INIS)

    Hutchinson, I.P.G.; Ellison, R.D.

    1992-01-01

    Closure of a waste management unit can be either permanent or temporary. Permanent closure may be due to: economic factors which make it uneconomical to mine the remaining minerals; depletion of mineral resources; physical site constraints that preclude further mining and beneficiation; environmental, regulatory or other requirements that make it uneconomical to continue to develop the resources. Temporary closure can occur for a period of several months to several years, and may be caused by factors such as: periods of high rainfall or snowfall which prevent mining and waste disposal; economic circumstances which temporarily make it uneconomical to mine the target mineral; labor problems requiring a cessation of operations for a period of time; construction activities that are required to upgrade project components such as the process facilities and waste management units; and mine or process plant failures that require extensive repairs. Permanent closure of a mine waste management unit involves the provision of durable surface containment features to protect the waters of the State in the long-term. Temporary closure may involve activities that range from ongoing maintenance of the existing facilities to the installation of several permanent closure features in order to reduce ongoing maintenance. This paper deals with the permanent closure features

  6. Hanford analytical services quality assurance requirements documents. Volume 1: Administrative Requirements

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1997-01-01

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  7. Conversion of dependability deterministic requirements into probabilistic requirements

    International Nuclear Information System (INIS)

    Bourgade, E.; Le, P.

    1993-02-01

    This report concerns the on-going survey conducted jointly by the DAM/CCE and NRE/SR branches on the inclusion of dependability requirements in control and instrumentation projects. Its purpose is to enable a customer (the prime contractor) to convert into probabilistic terms dependability deterministic requirements expressed in the form ''a maximum permissible number of failures, of maximum duration d in a period t''. The customer shall select a confidence level for each previously defined undesirable event, by assigning a maximum probability of occurrence. Using the formulae we propose for two repair policies - constant rate or constant time - these probabilized requirements can then be transformed into equivalent failure rates. It is shown that the same formula can be used for both policies, providing certain realistic assumptions are confirmed, and that for a constant time repair policy, the correct result can always be obtained. The equivalent failure rates thus determined can be included in the specifications supplied to the contractors, who will then be able to proceed to their previsional justification. (author), 8 refs., 3 annexes

  8. Requirements in engineering projects

    CERN Document Server

    Fernandes, João M

    2016-01-01

    This book focuses on various topics related to engineering and management of requirements, in particular elicitation, negotiation, prioritisation, and documentation (whether with natural languages or with graphical models). The book provides methods and techniques that help to characterise, in a systematic manner, the requirements of the intended engineering system.  It was written with the goal of being adopted as the main text for courses on requirements engineering, or as a strong reference to the topics of requirements in courses with a broader scope. It can also be used in vocational courses, for professionals interested in the software and information systems domain.   Readers who have finished this book will be able to: - establish and plan a requirements engineering process within the development of complex engineering systems; - define and identify the types of relevant requirements in engineering projects; - choose and apply the most appropriate techniques to elicit the requirements of a giv...

  9. An Engineering Method of Civil Jet Requirements Validation Based on Requirements Project Principle

    Science.gov (United States)

    Wang, Yue; Gao, Dan; Mao, Xuming

    2018-03-01

    A method of requirements validation is developed and defined to meet the needs of civil jet requirements validation in product development. Based on requirements project principle, this method will not affect the conventional design elements, and can effectively connect the requirements with design. It realizes the modern civil jet development concept, which is “requirement is the origin, design is the basis”. So far, the method has been successfully applied in civil jet aircraft development in China. Taking takeoff field length as an example, the validation process and the validation method of the requirements are detailed introduced in the study, with the hope of providing the experiences to other civil jet product design.

  10. From requirements to Java in a snap model-driven requirements engineering in practice

    CERN Document Server

    Smialek, Michal

    2015-01-01

    This book provides a coherent methodology for Model-Driven Requirements Engineering which stresses the systematic treatment of requirements within the realm of modelling and model transformations. The underlying basic assumption is that detailed requirements models are used as first-class artefacts playing a direct role in constructing software. To this end, the book presents the Requirements Specification Language (RSL) that allows precision and formality, which eventually permits automation of the process of turning requirements into a working system by applying model transformations and co

  11. Getting Grip on Security Requirements Elicitation by Structuring and Reusing Security Requirements Sources

    Directory of Open Access Journals (Sweden)

    Christian Schmitt

    2015-07-01

    Full Text Available This paper presents a model for structuring and reusing security requirements sources. The model serves as blueprint for the development of an organization-specific repository, which provides relevant security requirements sources, such as security information and knowledge sources and relevant compliance obligations, in a structured and reusable form. The resulting repository is intended to be used by development teams during the elicitation and analysis of security requirements with the goal to understand the security problem space, incorporate all relevant requirements sources, and to avoid unnecessary effort for identifying, understanding, and correlating applicable security requirements sources on a project-wise basis. We start with an overview and categorization of important security requirements sources, followed by the description of the generic model. To demonstrate the applicability and benefits of the model, the instantiation approach and details of the resulting repository of security requirements sources are presented.

  12. Subsurface Contamination Focus Area technical requirements. Volume 1: Requirements summary

    International Nuclear Information System (INIS)

    Nickelson, D.; Nonte, J.; Richardson, J.

    1996-10-01

    This document summarizes functions and requirements for remediation of source term and plume sites identified by the Subsurface Contamination Focus Area. Included are detailed requirements and supporting information for source term and plume containment, stabilization, retrieval, and selective retrieval remedial activities. This information will be useful both to the decision-makers within the Subsurface Contamination Focus Area (SCFA) and to the technology providers who are developing and demonstrating technologies and systems. Requirements are often expressed as graphs or charts, which reflect the site-specific nature of the functions that must be performed. Many of the tradeoff studies associated with cost savings are identified in the text

  13. Waste management system requirements document

    International Nuclear Information System (INIS)

    1991-02-01

    This volume defines the top level requirements for the Mined Geologic Disposal System (MGDS). It is designed to be used in conjunction with Volume 1 of the WMSR, General System Requirements. It provides a functional description expanding the requirements allocated to the MGDS in Volume 1 and elaborates on each requirement by providing associated performance criteria as appropriate. Volumes 1 and 4 of the WMSR provide a minimum set of requirements that must be satisfied by the final MGDS design. This document sets forth specific requirements that must be fulfilled. It is not the intent or purpose of this top level document to describe how each requirement is to be satisfied in the final MGDS design. Each subsequent level of the technical document hierarchy must provide further guidance and definition as to how each of these requirements is to be implemented in the design. It is expected that each subsequent level of requirements will be significantly more detailed. Section 2 of this volume provides a functional description of the MGDS. Each function is addressed in terms of requirements, and performance criteria. Section 3 provides a list of controlling documents. Each document cited in a requirement of Chapter 2 is included in this list and is incorporated into this document as a requirement on the final system. The WMSR addresses only federal requirements (i.e., laws, regulations and DOE orders). State and local requirements are not addressed. However, it will be specifically noted at the potentially affected WMSR requirements that there could be additional or more stringent regulations imposed by a state or local requirements or administering agency over the cited federal requirements

  14. Research and development associated with licensing of MHTGR [Modular High Temperature Gas-Cooled Reactor

    International Nuclear Information System (INIS)

    Jones, H.

    1990-01-01

    The Modular High Temperature Gas-Cooled Reactor (MHTGR) currently under development by the US Department of Energy (US-DOE) for commercial applications has top-level goals of producing safe, economical power for the US utility industry. The utility industry has been represented in formulating design and licensing requirements through both a ''Utility User Requirements Document'' and by participating in the DOE system engineering process known as the ''Integrated Approach.'' The result of this collaboration has been to set stringent goals for both the safety and operational reliability of the MHTGR. To achieve these goals, the designer must have access to a more comprehensive data base of properties in several fields of technology than is currently available. A technology development program has been planned to provide this data to the designer in time to support both his design activities and the submittal of formal licensing application documents. The US-DOE has chosen the Oak Ridge National Laboratory (ORNL) to take the lead in planning and executing these technology programs. When completed these will augment the designer's current data base and provide the necessary depth to meet the stringent goals which have been set for the MHTGR. It is worth noting that the goals of safety and operational reliability are complementary, and the data required from the technology development program will be similar. Therefore, the program to support the licensing of the MHTGR is not separate from that required for design, but is a subset of that which meets all the requirements that result from implementing the US-DOE's integrated approach. 38 figs

  15. User Requirements for Wireless

    DEFF Research Database (Denmark)

    in the elicitation process. Cases and user requirement elements discussed in the book include: User requirements elicitation processes for children, construction workers, and farmers User requirements for personalized services of a broadcast company Variations in user involvement Practical elements of user...

  16. Lawrence Livermore National Laboratory Environmental Report 2016

    Energy Technology Data Exchange (ETDEWEB)

    Rosene, Crystal [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-21

    The purposes of the Environmental Report 2016 are to record LLNL’s compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring. Specifically, the report discusses LLNL’s EMS; describes significant accomplishments in pollution prevention; presents the results of air, water, vegetation, and foodstuff monitoring; reports radiological doses from LLNL operations; summarizes LLNL’s activities involving special status wildlife, plants, and habitats; and describes the progress LLNL has made in remediating groundwater contamination. Environmental monitoring at LLNL, including analysis of samples and data, is conducted according to documented standard operating procedures. Duplicate samples are collected and analytical results are reviewed and compared to internal acceptance standards. This report is prepared for DOE by LLNL’s Environmental Functional Area (EFA). Submittal of the report satisfies requirements under DOE Order 231.1B, “Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.” The report is distributed in electronic form and is available to the public at https://saer.llnl.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning with 1994 are also on the website.

  17. Future Home Network Requirements

    DEFF Research Database (Denmark)

    Charbonnier, Benoit; Wessing, Henrik; Lannoo, Bart

    This paper presents the requirements for future Home Area Networks (HAN). Firstly, we discuss the applications and services as well as their requirements. Then, usage scenarios are devised to establish a first specification for the HAN. The main requirements are an increased bandwidth (towards 1...

  18. W-026, acceptance test report gamma energy assay (GEA) system A(submittal {number_sign}39.8) C3

    Energy Technology Data Exchange (ETDEWEB)

    Watson, T. L.

    1997-01-28

    This test procedure is designed to test all of the functions of the GEA system at the WRAP facility at Hanford, Washington. The procedure is designed to be executed in the sequence given, starting with: * verification of components and labeling * verification or entry of all of the setup parameters * performing the calibrations (energy, efficiency, transmission, and reference peak) * performing the measurements in local mode * performing the measurements in remote mode * confirming the message formats * utility operations (LN2 fill, archiving, password maintenance) The system is designed to be operated in a remote mode in which all commands are received over a network, and the results are returned over the same network. A manual mode is provided for the setup and calibration operations, and for maintenance functions. The system is designed to start up in remote mode. The user can go to local mode when at the keyboard by selecting Exit on the screen shown during remote mode. A user logon screen, requiring 2 username and password, limits access to local mode.

  19. Requirements model generation to support requirements elicitation: The Secure Tropos experience

    NARCIS (Netherlands)

    Kiyavitskaya, N.; Zannone, N.

    2008-01-01

    In recent years several efforts have been devoted by researchers in the Requirements Engineering community to the development of methodologies for supporting designers during requirements elicitation, modeling, and analysis. However, these methodologies often lack tool support to facilitate their

  20. System requirements and design description for the environmental requirements management interface (ERMI)

    International Nuclear Information System (INIS)

    Biebesheimer, E.

    1997-01-01

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC

  1. 12 CFR 564.3 - Appraisals required; transactions requiring a State certified or licensed appraiser.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Appraisals required; transactions requiring a State certified or licensed appraiser. 564.3 Section 564.3 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY APPRAISALS § 564.3 Appraisals required; transactions requiring a State...

  2. Severe accident progression perspectives based on IPE results

    International Nuclear Information System (INIS)

    Lehner, J.R.; Lin, C.C.; Pratt, W.T.; Drouin, M.

    1996-01-01

    Accident progression perspectives were gathered from the level 2 PRA analyses (the analysis of the accident after core damage has occurred involving the containment performance and the radionuclide release from the containment) described in the IPE submittals. Insights related to the containment failure modes, the releases associated with those failure modes, and the factors responsible for the types of containment failures and release sizes reported were obtained. Complete results are discussed in NUREG-1560 and summarized here

  3. Technical evaluation of the proposed design modifications and technical specification changes on grid voltage degradation (Part A) for the Pilgrim Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    White, R.L.

    1980-01-01

    This report documents the technical evaluation of the proposed design modifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the Pilgrim Nuclear Power Station. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation compares the submittals made by the licensee with the NRC staff positions and the review criteria and presents the reviewer's conclusion on the acceptability of the proposed system

  4. PIT Coating Requirements Analysis

    International Nuclear Information System (INIS)

    MINTEER, D.J.

    2000-01-01

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products

  5. PIT Coating Requirements Analysis

    Energy Technology Data Exchange (ETDEWEB)

    MINTEER, D.J.

    2000-10-20

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

  6. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  7. Submittal of SWMU Assessment Report for Building 9960 Surface Discharge

    Energy Technology Data Exchange (ETDEWEB)

    Dotson, Patrick Wells [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-01

    Sandia National Laboratories is a multi-purpose engineering and science laboratory owned by the U.S. Department of Energy (DOE)/National Nuclear Security Administration and managed and operated by Sandia Corporation (Sandia), a wholly-owned subsidiary of Lockheed Martin Corporation. This Solid Waste Management Unit (SWMU) Assessment Report (SAR) for the Sandia National Laboratories, New Mexico (SNL/NM), Coyote Test Field, Building 9960 Surface Discharge, has been prepared in accordance with Section V of the Compliance Order on Consent (the Consent Order) between the New Mexico Environment Department (NMED), DOE, and Sandia (NMED April 2004). The DOE and Sandia formally notified the NMED of this newly identified or suspected SWMU or Area of Concern (AOC) by letter dated December 9, 2014. This SAR is being submitted in accordance with the NMED Hazardous Waste Bureau (HWB) letter dated February 16, 2015 letter (Kieling February 2015). This SAR presents the available information for the Building 9960 Surface Discharge, including location, designation of type and function, a general description, the operational dates, waste characteristics, and a summary of existing analytical wastewater and soil data

  8. submitter Prospects of Sterile Neutrino Search with the FCC-ee

    CERN Document Server

    Bay Nielsen, Sissel

    A proposed future circular e + e − collider, the FCC-ee, is suggested to search for sterile neutrinos. The Neutrino Minimal Standard Model, νMSM, is a model of sterile neutrinos, that accommodates explanations for several phenomena of physics beyond the Standard Model. This thesis presents an overview of the theoretical motivation for νMSM, an outline of the experimental conditions at the FCC-ee, and a review of previous accelerator bounds for sterile neutrinos. Two studies of sterile neutrinos with masses at the electroweak scale are introduced, an analysis of long lived sterile neutrinos, and an analysis of short lived sterile neutrinos. Both analyses include background studies and sensitivity estimates for the FCC-ee detector. The study of long lived sterile neutrinos is based on a search for detectable displaced vertices with 1012 Z decays, obtaining a search reach on the mixing angle |θ| 2 as small as 10−11. The study of short lived sterile neutrinos is a Monte Carlo study with a cut-based analysi...

  9. submitter Some Critical Collective Effects for the FCC-ee Collider

    CERN Document Server

    Belli, Eleonora; Migliorati, Mauro; Persichelli, Serena; Rumolo, Giovanni; Spataro, Bruno; Zobov, Mikhail

    2017-01-01

    In the framework of the Future Circular Collider (FCC) design studies at CERN [1], the high luminosity electron-positron collider FCC-ee is considered as a possible first step towards FCC-hh, a 100 TeV hadron collider in the same tunnel of about 100 km. Table 1 summarizes the main beam parameters at four different center-of-mass energies from 45.6 GeV (Z pole) to 175 GeV (top pair threshold). One of the major issues for such a kind of machine is represented by collective effects due to electromagnetic fields generated by the interaction of the beam with the vacuum chamber, which could produce instabilities, thus limiting the machine operation and performance. An impedance model is needed to study these instabilities, to predict their effects on the beam dynamics and to find a possible solution for their mitigation. Another critical aspect for the future lepton collider is represented by the electron cloud which will be discussed in the last section of this contribution, together with possible strategies to su...

  10. Accelerator Production of Tritium Programmatic Environmental Impact Statement Input Submittal

    International Nuclear Information System (INIS)

    Miller, L.A.; Greene, G.A.; Boyack, B.E.

    1996-02-01

    The Programmatic Environmental Impact Statement for Tritium Supply and Recycling considers several methods for the production of tritium. One of these methods is the Accelerator Production of Tritium. This report summarizes the design characteristics of APT including the accelerator, target/blanket, tritium extraction facility, and the balance of plant. Two spallation targets are considered: (1) a tungsten neutron-source target and (2) a lead neutron-source target. In the tungsten target concept, the neutrons are captured by the circulating He-3, thus producing tritium; in the lead target concept, the tritium is produced by neutron capture by Li-6 in a surrounding lithium-aluminum blanket. This report also provides information to support the PEIS including construction and operational resource needs, waste generation, and potential routine and accidental releases of radioactive material. The focus of the report is on the impacts of a facility that will produce 3/8th of the baseline goal of tritium. However, some information is provided on the impacts of APT facilities that would produce smaller quantities

  11. submitter Projects for ultra-high-energy circular colliders at CERN

    CERN Document Server

    Bogomyagkov, A V; Levichev, E B; Piminov, P A; Sinyatkin, S V; Shatilov, D N; Benedict, M; Oide, K; Zimmermann, F

    2016-01-01

    Within the Future Circular Collider (FCC) design study launched at CERN in 2014, it is envisaged to construct hadron (FCC-hh) and lepton (FCC-ee) ultra-high-energy machines aimed to replace the LHC upon the conclusion of its research program. The Budker Institute of Nuclear Physics is actively involved in the development of the FCC-ee electron–positron collider. The Crab Waist (CR) scheme of the collision region that has been proposed by INP and will be implemented at FCC-ee is expected to provide high luminosity over a broad energy range. The status and development of the FCC project are described, and its parameters and limitations are discussed for the lepton collider in particular.

  12. DCS Hydrology Submittal, Santa Fe County, NM and Incorporated Areas

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydrology data include spatial datasets and data tables necessary for documenting the hydrologic procedures for estimating flood discharges for a flood insurance...

  13. DCS Terrain Submittal for Santa Fe County, New Mexico, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix M: Data Capture Standards, describes the digital topographic data that was used to create...

  14. submitter Thermal, Hydraulic, and Electromagnetic Modeling of Superconducting Magnet Systems

    CERN Document Server

    Bottura, L

    2016-01-01

    Modeling techniques and tailored computational tools are becoming increasingly relevant to the design and analysis of large-scale superconducting magnet systems. Efficient and reliable tools are useful to provide an optimal forecast of the envelope of operating conditions and margins, which are difficult to test even when a prototype is available. This knowledge can be used to considerably reduce the design margins of the system, and thus the overall cost, or increase reliability during operation. An integrated analysis of a superconducting magnet system is, however, a complex matter, governed by very diverse physics. This paper reviews the wide spectrum of phenomena and provides an estimate of the time scales of thermal, hydraulic, and electromagnetic mechanisms affecting the performance of superconducting magnet systems. The analysis is useful to provide guidelines on how to divide the complex problem into building blocks that can be integrated in a design and analysis framework for a consistent multiphysic...

  15. submitter Muon trigger efficiency of the ATLAS Detector at LHC

    CERN Document Server

    Gallus, Petr

    The diploma thesis is devoted to the study of the muon trigger efficiency performance in the ATLAS experiment at the LHC collider. It contains measurements of efficiency of muon triggers of Level 1 and Level 2. Level 1 (LVL1) trigger efficiency of L1 MU20 and L1 2MU20 triggers is measured using Monte-Carlo simulated events. For Level 2 the efficiency of MuFast trigger is analysed in relation to the LVL1 decision. In both examples it is shown that the trigger efficiency depends on the detector geometry and transversal momentum pT of muons. Key words: ATLAS, LHC, trigger

  16. submitter Technical Note: Using DEG-CPCs at upper tropospheric temperatures

    CERN Document Server

    Wimmer, D; Nieminen, T; Duplissy, J; Ehrhart, S; Almeida, J; Rondo, L; Franchin, A; Kreissl, F; Bianchi, F; Manninen, H E; Kulmala, M; Curtius, J; Petäjä, T

    2015-01-01

    Over the last few years, several condensation particle counters (CPCs) capable of measuring in the sub-3 nm size range have been developed. Here we study the performance of CPCs based on diethylene glycol (DEG) at different temperatures during Cosmics Leaving OUtdoor Droplets (CLOUD) measurements at CERN. The data shown here are the first set of verification measurements for sub-3 nm CPCs under upper tropospheric temperatures using atmospherically relevant aerosol particles. To put the results in perspective we calibrated the DEG-CPC at room temperature, resulting in a cut-off diameter of 1.4 nm. All diameters refer to mobility equivalent diameters in this paper. At upper tropospheric temperatures ranging from 246.15 K to 207.15 K, we found cut-off sizes relative to a particle size magnifier in the range of 2.5 to 2.8 nm. Due to low number concentration after size classification, the cut-off diameters have a high uncertainty (±0.3 nm) associated with them. Operating two laminar flow DEG-CPCs with different c...

  17. 40 CFR 94.509 - Maintenance of records; submittal of information.

    Science.gov (United States)

    2010-07-01

    ... all testing. Records may be retained as hard copy (i.e., on paper) or reduced to microfilm, floppy... procedure; provided, that in every case, all the information contained in the hard copy is retained. (c) The... production line testing using an EPA information format. ...

  18. submitter Test strategies for industrial testers for converter controls equipment

    CERN Document Server

    Oleniuk, P; Kasampalis, V; Nisbet, D; Todd, B; Uznański, S

    2017-01-01

    Power converters and their controls electronics are key elements for the operation of the CERN accelerator complex, having a direct impact on its availability. To prevent early-life failures and provide means to verify electronics, a set of industrial testers is used throughout the converters controls electronics' life cycle. The roles of the testers are to validate mass production during the manufacturing phase and to provide means to diagnose and repair failed modules that are brought back from operation. In the converter controls electronics section of the power converters group in the technology department of CERN (TE/EPC/CCE), two main test platforms have been adopted: a PXI platform for mixed analogue-digital functional tests and a JTAG Boundary-Scan platform for digital interconnection and functional tests. Depending on the functionality of the device under test, the appropriate test platforms are chosen. This paper is a follow-up to results presented at the TWEPP 2015 conference, adding the boundary s...

  19. submitter Experimental investigation of ion–ion recombination under atmospheric conditions

    CERN Document Server

    Franchin, A; Leppä, J; Nieminen, T; Gagné, S; Schobesberger, S; Wimmer, D; Duplissy, J; Riccobono, F; Dunne, E M; Rondo, L; Downard, A; Bianchi, F; Kupc, A; Tsagkogeorgas, G; Lehtipalo, K; Manninen, H E; Almeida, J; Amorim, A; Wagner, P E; Hansel, A; Kirkby, J; Kürten, A; Donahue, N M; Makhmutov, V; Mathot, S; Metzger, A; Petäjä, T; Schnitzhofer, R; Sipilä, M; Stozhkov, Y; Tomé, A; Kerminen, V -M; Carslaw, K; Curtius, J; Baltensperger, U; Kulmala, M

    2015-01-01

    We present the results of laboratory measurements of the ion–ion recombination coefficient at different temperatures, relative humidities and concentrations of ozone and sulfur dioxide. The experiments were carried out using the Cosmics Leaving OUtdoor Droplets (CLOUD) chamber at CERN, the walls of which are made of conductive material, making it possible to measure small ions. We produced ions in the chamber using a 3.5 GeV $c^{−1}$ beam of positively charged pions $(π^+)$ generated by the CERN Proton Synchrotron (PS). When the PS was switched off, galactic cosmic rays were the only ionization source in the chamber. The range of the ion production rate varied from 2 to 100 $cm^{−3} s^{−1}$, covering the typical range of ionization throughout the troposphere. The temperature ranged from −55 to 20 °C, the relative humidity (RH) from 0 to 70 %, the SO2 concentration from 0 to 40 ppb, and the ozone concentration from 200 to 700 ppb. The best agreement of the retrieved ion–ion recombination coeffici...

  20. submitter Measurement of LYSO Intrinsic Light Yield Using Electron Excitation

    CERN Document Server

    Martinez Turtos, Rosana; Pizzichemi, Marco; Ghezzi, Alessio; Pauwels, Kristof; Auffray, Etiennette; Lecoq, Paul; Paganoni, Marco

    2016-01-01

    The determination of the intrinsic light yield $(LY_{int})$ of scintillating crystals, i.e. number of optical photons created per amount of energy deposited, constitutes a key factor in order to characterize and optimize their energy and time resolution. However, until now measurements of this quantity are affected by large uncertainties and often rely on corrections for bulk absorption and surface/edge state. The novel idea presented in this contribution is based on the confinement of the scintillation emission in the central upper part of a 10 mm cubic crystal using a 1.5 MeV electron beam with diameter of 1 mm. A black non-reflective pinhole aligned with the excitation point is used to fix the light extraction solid angle (narrower than total reflection angle), which then sets a light cone travel path through the crystal. The final number of photoelectrons detected using a Hamamatsu R2059 photomultiplier tube (PMT) was corrected for the extraction solid angle, the Fresnel reflection coefficient and quantum...

  1. Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2008-01-01

    Corrective Action Unit (CAU) 90, Area 2 Bitcutter Containment, is identified in the Federal Facility Agreement and Consent Order of 1996, as amended February 2008. The post-closure requirements for CAU 90 are described in Section VII.B.8.b of the Nevada Test Site Resource Conservation and Recovery Act Permit for a Hazardous Waste Management Facility Number NEV HW0021, dated November 2005. Post-closure activities consist of the following: (1) Semiannual inspections of the site using inspection checklists; (2) Photographic documentation; (3) Field note documentation; and (4) Preparation and submittal of an annual Post-Closure Inspection Report. This annual report covers the period of July 2007 to June 2008 and consists of a summary of the results of the inspections, copies of the inspection checklists and field notes, maintenance and repair records (if any), photographs, and conclusions and recommendations. The inspection checklists are provided in Appendix A, a copy of the field notes is provided in Appendix B, and copies of photographs taken during the inspections are provided in Appendix C

  2. The Reactor Analysis Support Package (RASP): Volume 10, Guidelines for developing a reload licensing capability:Final report

    International Nuclear Information System (INIS)

    Diamond, D.J.

    1988-08-01

    The EPRI Reactor Analysis Support Package (RASP) consists of computer codes and documentation for calculating core performance and plant transients. This report was written to help a utility to use these tools properly for reload design and safety evaluations. The emphasis is on the steps that the utility can take to develop a methodology that is approved by the Nuclear Regulatory Commission for reload licensing submittals. The report treats both the planning and the implementation of this type of calculational capability. With regard to planning, there is discussion defining objectives, resource requirements, organization and scheduling. In order to help the engineering staff implement the plan there is discussion of the development of a methodology for event analysis, qualification of the methods, and the writing of design control procedures and topical reports. The experience of utilities, and especially of GPU Nuclear Corporation (GPUN), in developing a reload licensing capability is cited throughout the report and extracts from GPUN design control procedures are included in the appendices. 16 refs., 23 figs., 9 tabs

  3. Science to compliance: The WIPP success story

    International Nuclear Information System (INIS)

    Howarth, S.M.; Chu, M.S.; Shephard, L.E.

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed to provide in-depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. The success of the program, however, is defined by the regulator in the context of compliance with performance criteria, rather than by the in-depth technical understanding typical of most scientific programs. The WIPP project was successful in making a transformation from science to compliance by refocusing and redirecting programmatic efforts toward the singular goal of meeting regulatory compliance requirements while accelerating the submittal of the Compliance Certification Application (CCA) by two months from the April 1994 Disposal Decision Plan (DDP) date of December 1996, and by reducing projected characterization costs by more than 40%. This experience is unparalleled within the radioactive waste management community and has contributed to numerous lessons learned from which the entire community can benefit

  4. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    BOOM, R.J.

    1999-01-01

    Section I: Background Return on Investment (ROI) Proposal Preparation Guide-- Over $1.9M is available to fund fiscal year (FY) 2000 waste minimization projects on the Hanford Site. This money was allocated by the US. Department of Energy Headquarters (DOE-HQ). The U.S. Department of Energy, Richland Operations (RL) and the U.S. Department of Energy, Office of River Protection (ORP) are currently seeking pollution prevention proposals from across the Hanford Site that provide a high return-on-investment (ROI) by reducing waste and associated management costs. Purpose of ROI Training The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to RL for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding. This guide accompanies the one-hour training workshop on how to prepare and submit an ROI proposal

  5. Licensing Support Network: An Electronic Discovery System

    International Nuclear Information System (INIS)

    Gil, A. V.; Jensen, D.; McKinnon, B.

    2002-01-01

    The necessary authorization for the U. S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) to submit a License Application (LA) is contingent upon the policy process defined in the Nuclear Waste Policy Act, as amended (NWPA), with some steps yet to occur. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for submittal of an application and to facilitate the U. S. Nuclear Regulatory Commission (NRC) review of this application, if the Yucca Mountain site is recommended and approved for repository development. One of these steps the DOE has taken involves working with the NRC's Advisory Review Panel to develop Licensing Support Network (LSN) requirements and guidelines. The NRC has made a prototype of the LSN web page available at www.LSNNET.gov. The OCRWM part of the LSN currently has an indefinite life cycle and may need to remain in existence until the repository is closed, which could be as long as 325 years

  6. Functional requirements of road lighting.

    NARCIS (Netherlands)

    Schreuder, D.A.

    1975-01-01

    The functional, technical and visual requirements for public lighting are discussed. The improvement of the presentation of information to the road user is the main functional requirement. The visual requirements can be deduced from the functional requirement of enabling drivers to follow the

  7. Savannah River Site offsite hazardous waste shipment data validation report. Revision 1

    International Nuclear Information System (INIS)

    Casey, C.; Kudera, D.E.; Page, L.A.; Rohe, M.J.

    1995-05-01

    The objective of this data validation is to verify that waste shipments reported in response to the US Department of Energy Headquarters data request are properly categorized according to DOE-HQ definitions. This report documents all findings and actions resulting from the independent review of the Savannah River Site data submittal, and provides a summary of the SRS data submittal and data validation strategy. The overall hazardous waste management and offsite release process from 1987--1991 is documented, along with an identification and description of the hazardous waste generation facilities. SRS did not ship any hazardous waste offsite before 1987. Sampling and analysis and surface surveying procedures and techniques used in determining offsite releasability of the shipments are also described in this report. SRS reported 150 manifested waste shipments from 1984 to 1991 that included 4,755 drums or lab packs and 13 tankers. Of these waste items, this report categorizes 4,251 as clean (including 12 tankers), 326 as likely clean, 138 as likely radioactive, and 55 as radioactive (including one tanker). Although outside the original scope of this report, 14 manifests from 1992 and 1993 are included, covering 393 drums or lab packs and seven tankers. From the 1992--1993 shipments, 58 drums or lab packs are categorized as radioactive and 16 drums are categorized as likely radioactive. The remainder are categorized as clean

  8. Tools and Databases of the KOMICS Web Portal for Preprocessing, Mining, and Dissemination of Metabolomics Data

    Directory of Open Access Journals (Sweden)

    Nozomu Sakurai

    2014-01-01

    Full Text Available A metabolome—the collection of comprehensive quantitative data on metabolites in an organism—has been increasingly utilized for applications such as data-intensive systems biology, disease diagnostics, biomarker discovery, and assessment of food quality. A considerable number of tools and databases have been developed to date for the analysis of data generated by various combinations of chromatography and mass spectrometry. We report here a web portal named KOMICS (The Kazusa Metabolomics Portal, where the tools and databases that we developed are available for free to academic users. KOMICS includes the tools and databases for preprocessing, mining, visualization, and publication of metabolomics data. Improvements in the annotation of unknown metabolites and dissemination of comprehensive metabolomic data are the primary aims behind the development of this portal. For this purpose, PowerGet and FragmentAlign include a manual curation function for the results of metabolite feature alignments. A metadata-specific wiki-based database, Metabolonote, functions as a hub of web resources related to the submitters' work. This feature is expected to increase citation of the submitters' work, thereby promoting data publication. As an example of the practical use of KOMICS, a workflow for a study on Jatropha curcas is presented. The tools and databases available at KOMICS should contribute to enhanced production, interpretation, and utilization of metabolomic Big Data.

  9. Savannah River Site offsite hazardous waste shipment data validation report. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Casey, C.; Kudera, D.E.; Page, L.A.; Rohe, M.J.

    1995-05-01

    The objective of this data validation is to verify that waste shipments reported in response to the US Department of Energy Headquarters data request are properly categorized according to DOE-HQ definitions. This report documents all findings and actions resulting from the independent review of the Savannah River Site data submittal, and provides a summary of the SRS data submittal and data validation strategy. The overall hazardous waste management and offsite release process from 1987--1991 is documented, along with an identification and description of the hazardous waste generation facilities. SRS did not ship any hazardous waste offsite before 1987. Sampling and analysis and surface surveying procedures and techniques used in determining offsite releasability of the shipments are also described in this report. SRS reported 150 manifested waste shipments from 1984 to 1991 that included 4,755 drums or lab packs and 13 tankers. Of these waste items, this report categorizes 4,251 as clean (including 12 tankers), 326 as likely clean, 138 as likely radioactive, and 55 as radioactive (including one tanker). Although outside the original scope of this report, 14 manifests from 1992 and 1993 are included, covering 393 drums or lab packs and seven tankers. From the 1992--1993 shipments, 58 drums or lab packs are categorized as radioactive and 16 drums are categorized as likely radioactive. The remainder are categorized as clean.

  10. Tools and databases of the KOMICS web portal for preprocessing, mining, and dissemination of metabolomics data.

    Science.gov (United States)

    Sakurai, Nozomu; Ara, Takeshi; Enomoto, Mitsuo; Motegi, Takeshi; Morishita, Yoshihiko; Kurabayashi, Atsushi; Iijima, Yoko; Ogata, Yoshiyuki; Nakajima, Daisuke; Suzuki, Hideyuki; Shibata, Daisuke

    2014-01-01

    A metabolome--the collection of comprehensive quantitative data on metabolites in an organism--has been increasingly utilized for applications such as data-intensive systems biology, disease diagnostics, biomarker discovery, and assessment of food quality. A considerable number of tools and databases have been developed to date for the analysis of data generated by various combinations of chromatography and mass spectrometry. We report here a web portal named KOMICS (The Kazusa Metabolomics Portal), where the tools and databases that we developed are available for free to academic users. KOMICS includes the tools and databases for preprocessing, mining, visualization, and publication of metabolomics data. Improvements in the annotation of unknown metabolites and dissemination of comprehensive metabolomic data are the primary aims behind the development of this portal. For this purpose, PowerGet and FragmentAlign include a manual curation function for the results of metabolite feature alignments. A metadata-specific wiki-based database, Metabolonote, functions as a hub of web resources related to the submitters' work. This feature is expected to increase citation of the submitters' work, thereby promoting data publication. As an example of the practical use of KOMICS, a workflow for a study on Jatropha curcas is presented. The tools and databases available at KOMICS should contribute to enhanced production, interpretation, and utilization of metabolomic Big Data.

  11. Public perceptions of wind energy developments: Case studies from New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Graham, Jessica B. [Department of Physics, University of Otago, PO Box 56, Dunedin (New Zealand); Stephenson, Janet R. [Department of Geography, University of Otago, PO Box 56, Dunedin (New Zealand)], E-mail: janet.stephenson@otago.ac.nz; Smith, Inga J. [Department of Physics, University of Otago, PO Box 56, Dunedin (New Zealand)

    2009-09-15

    Although the public generally hold positive attitudes towards wind energy, proposals for the construction of new wind farms are often met with strong resistance. In New Zealand, where the government has recently introduced ambitious policy targets for renewable energy generation, negative perceptions of wind farms are increasingly evident and have the potential to prevent the achievement of these targets. This research sets out to examine what influences social resistance to wind farms in New Zealand. Drawing from public submissions on three wind farm proposals, a framework developed by Devine-Wright [Devine-Wright, P., 2005a. Beyond NIMBYism: towards an integrated Framework for Understanding Public Perceptions of Wind Energy. Wind Energy 8, 125-139.] was used as the basis for identification of factors affecting public perceptions of wind farms. The research found firstly that there was no apparent relationship between the proximity of submitters to a proposed wind farm and their likelihood of having a negative perception of the proposal. A wide range of factors written in submissions appeared to have affected the submitter's decision to support or oppose the wind farm proposal. Some of these were consistent with Devine-Wright's findings, but ten further factors were added to the framework to adequately cover the aspects raised in submissions. The findings have implications for the achievement of New Zealand's energy policy aspirations.

  12. Public perceptions of wind energy developments. Case studies from New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Graham, Jessica B.; Smith, Inga J. [Department of Physics, University of Otago, PO Box 56, Dunedin (New Zealand); Stephenson, Janet R. [Department of Geography, University of Otago, PO Box 56, Dunedin (New Zealand)

    2009-09-15

    Although the public generally hold positive attitudes towards wind energy, proposals for the construction of new wind farms are often met with strong resistance. In New Zealand, where the government has recently introduced ambitious policy targets for renewable energy generation, negative perceptions of wind farms are increasingly evident and have the potential to prevent the achievement of these targets. This research sets out to examine what influences social resistance to wind farms in New Zealand. Drawing from public submissions on three wind farm proposals, a framework developed by Devine-Wright [Devine-Wright, P., 2005a. Beyond NIMBYism: towards an integrated Framework for Understanding Public Perceptions of Wind Energy. Wind Energy 8, 125-139.] was used as the basis for identification of factors affecting public perceptions of wind farms. The research found firstly that there was no apparent relationship between the proximity of submitters to a proposed wind farm and their likelihood of having a negative perception of the proposal. A wide range of factors written in submissions appeared to have affected the submitter's decision to support or oppose the wind farm proposal. Some of these were consistent with Devine-Wright's findings, but ten further factors were added to the framework to adequately cover the aspects raised in submissions. The findings have implications for the achievement of New Zealand's energy policy aspirations. (author)

  13. Utility requirements for fusion

    International Nuclear Information System (INIS)

    Vondrasek, R.J.

    1982-02-01

    This report describes work done and results obtained during performance of Task 1 of a study of Utility Requirements and Criteria for Fusion Options. The work consisted of developing a list of utility requirements for fusion optics containing definition of the requirements and showing their relative importance to the utility industry. The project team members developed a preliminary list which was refined by discussions and literature searches. The refined list was recast as a questionnaire which was sent to a substantial portion of the utility industry in this country. Forty-three questionnaire recipients responded including thirty-two utilities. A workshop was held to develop a revised requirements list using the survey responses as a major input. The list prepared by the workshop was further refined by a panel consisting of vice presidents of the three project team firms. The results of the study indicate that in addition to considering the cost of energy for a power plant, utilities consider twenty-three other requirements. Four of the requirements were judged to be vital to plant acceptability: Plant Capital Cost, Financial Liability, Plant Safety and Licensability

  14. Engineering Requirements for crowds

    Directory of Open Access Journals (Sweden)

    Rogeiro Silva

    2015-12-01

    Full Text Available In the software project the interested parts are highly distributed and form numerous and heterogeneous groups, online or face, constituting what could be called crowds. The development of social applications and cloud computing and mobile has generated a marked increase in environments based requirements in crowds. Technical Requirements Engineering (RE traditional face these scalability issues, and require the co-presence of interested and engineers in joint meetings that can not be made in common physical environments. While different approaches have been introduced to partially automate RE in these contexts, still is required a multi-method approach to semi-automate all activities related to work with crowds. In this paper is propose an approach that integrates existing elicitation techniques and requirements analysis and is complemented by introducing new concepts. The information is collected through direct interaction and social collaboration, and through data mining techniques.

  15. Neutrosophy for software requirement prioritization

    Directory of Open Access Journals (Sweden)

    Ronald Barriga Dias

    2017-09-01

    Full Text Available Software engineers are involved in complex decisions that require multiples viewpoints. A specific case is the requirement prioritization process. This process is used to decide which software requirement to develop in certain release from a group of candidate requirements. Criteria involved in this process can involve indeterminacy. In this paper a software requirement prioritization model is develop based SVN numbers. Finally, an illustrative example is presented in order to show the proposed model.

  16. submitter Physical Properties of a High-Strength Austenitic Stainless Steel for the Precompression Structure of the ITER Central Solenoid

    CERN Document Server

    Sgobba, Stefano; Arauzo, Ana; Roussel, Pascal; Libeyre, Paul

    2016-01-01

    The ITER central solenoid (CS) consists of six independent coils kept together by a precompression support structure that must react vertical tensile loads and provide sufficient preload to maintain coil-to-coil contact when the solenoid is energized. The CS precompression system includes tie plates, lower and upper key blocks, load distribution and isolation plates and other attachment, support and insulating hardware. The tie plates operating at 4 K are manufactured starting from forgings in a high-strength austenitic stainless steel (FXM-19) with a stringent specification. Moreover, forged components for the lower and upper key blocks have to be provided in the same FXM-19 grade with comparably strict requirements. FXM-19 is a high-nitrogen austenitic stainless steel, featuring high strength and toughness, ready weldability, and forgeability. It features as well higher integral thermal contraction down to 4 K compared with the very high Mn steel grade selected for the CS coil jackets, hence providing an ad...

  17. McRunjob: A High Energy Physics Workflow Planner for Grid Production Processing

    OpenAIRE

    Graham, G E; Evans, D; Bertram, I

    2003-01-01

    McRunjob is a powerful grid workflow manager used to manage the generation of large numbers of production processing jobs in High Energy Physics. In use at both the DZero and CMS experiments, McRunjob has been used to manage large Monte Carlo production processing since 1999 and is being extended to uses in regular production processing for analysis and reconstruction. Described at CHEP 2001, McRunjob converts core metadata into jobs submittable in a variety of environments. The powerful core...

  18. Proposed design modifications and technical specification changes on grid voltage degradation for the Point Beach Nuclear Plant, Units 1 and 2 (Docket Nos. 50-266 and 50-301). Technical evaluation report

    International Nuclear Information System (INIS)

    White, R.L.

    1981-01-01

    This report documents the technical evaluation of the proposed design mofifications and Technical Specification changes for protection of Class 1E equipment from grid voltage degradation for the Point Beach Nuclear Plant, Units 1 and 2. The review criteria are based on several IEEE standards and the Code of Federal Regulations. The evaluation compares the submittals made by the licensee with the NRC staff positions and the review criteria and presents the reviewer's conclusion on the acceptability of the proposed system

  19. Postmarket Requirements and Commitments

    Data.gov (United States)

    U.S. Department of Health & Human Services — Provides information to the public on postmarket requirements and commitments. The phrase postmarket requirements and commitments refers to studies and clinical...

  20. 40 CFR 63.2343 - What are my requirements for emission sources not requiring control?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my requirements for emission sources not requiring control? 63.2343 Section 63.2343 Protection of Environment ENVIRONMENTAL PROTECTION... (Non-Gasoline) What This Subpart Covers § 63.2343 What are my requirements for emission sources not...

  1. Requirements for existing buildings

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    This report collects energy performance requirements for existing buildings in European member states by June 2012.......This report collects energy performance requirements for existing buildings in European member states by June 2012....

  2. Safety Requirements and Modern Technical Requirements in Human Information Systems in Amman Hotels

    OpenAIRE

    Farouq Ahmad Alazzam; Sattam Rakan Allahawiah; Mohammad Nayef Alsarayreh; Kafa Hmoud Abdallah al Nawaiseh

    2015-01-01

    This study aimed to demonstrate the availability of Safety requirements and modern technical requirements in human information systems in Amman hotels. an the most important results of this study is the availability of security and safety requirements in human information systems In Amman hotels and The adequacy of the information that it provided .and show that all departments are not connected by appropriate and effective communication networks in adequate form . Also sophisticated operatin...

  3. Autonomous Real Time Requirements Tracing

    Science.gov (United States)

    Plattsmier, George; Stetson, Howard

    2014-01-01

    One of the more challenging aspects of software development is the ability to verify and validate the functional software requirements dictated by the Software Requirements Specification (SRS) and the Software Detail Design (SDD). Insuring the software has achieved the intended requirements is the responsibility of the Software Quality team and the Software Test team. The utilization of Timeliner-TLX(sup TM) Auto- Procedures for relocating ground operations positions to ISS automated on-board operations has begun the transition that would be required for manned deep space missions with minimal crew requirements. This transition also moves the auto-procedures from the procedure realm into the flight software arena and as such the operational requirements and testing will be more structured and rigorous. The autoprocedures would be required to meet NASA software standards as specified in the Software Safety Standard (NASASTD- 8719), the Software Engineering Requirements (NPR 7150), the Software Assurance Standard (NASA-STD-8739) and also the Human Rating Requirements (NPR-8705). The Autonomous Fluid Transfer System (AFTS) test-bed utilizes the Timeliner-TLX(sup TM) Language for development of autonomous command and control software. The Timeliner-TLX(sup TM) system has the unique feature of providing the current line of the statement in execution during real-time execution of the software. The feature of execution line number internal reporting unlocks the capability of monitoring the execution autonomously by use of a companion Timeliner-TLX(sup TM) sequence as the line number reporting is embedded inside the Timeliner-TLX(sup TM) execution engine. This negates I/O processing of this type data as the line number status of executing sequences is built-in as a function reference. This paper will outline the design and capabilities of the AFTS Autonomous Requirements Tracker, which traces and logs SRS requirements as they are being met during real-time execution of the

  4. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man month study was undertaken to identify utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980s. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980s. The issues are not meant to reflect a negative view of fusion, but are items that must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980s were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  5. Creativity in Requirement Identification

    DEFF Research Database (Denmark)

    Sørensen, Lene Tolstrup; Olesen, Henning

    Traditional requirements engineering focuses mainly on analysis and elicitation. However, current trends in new system, device and software are towards involving all stakeholders in the early stages of the engineering process to define the user requirements. Creativity is here seen as a major...... keystone in this process in order to open up stakeholder's mind to new technologies, which do not yet exist. This paper dis-cusses the application of creativity in the requirements process and illustrate through cases from the MAGNET and MAGNET Beyond projects....

  6. Capital Requirements and Banks' Leniency

    DEFF Research Database (Denmark)

    Dietrich, J. Kimball; Wihlborg, Clas

    2003-01-01

    We investigate the effect of changes in capital regulation on the strictness(leniency) of loan terms using a simple model of bank capital requirements andasset quality examinations. Banks offer different levels of `leniency' in the senseof willingness to offer automatic extensions of loans...... rates. As capital requirements increase thedifference between initial capital levels and between interest rates of strict andlenient banks decrease. Thus, higher capital requirements in recessions tend toreduce the interest rate premium paid for leniency. If a recession is interpreted asan increase...... in the required return, the interest rate premium paid for leniency isincreased in recession at a given level of required capital....

  7. Capturing security requirements for software systems.

    Science.gov (United States)

    El-Hadary, Hassan; El-Kassas, Sherif

    2014-07-01

    Security is often an afterthought during software development. Realizing security early, especially in the requirement phase, is important so that security problems can be tackled early enough before going further in the process and avoid rework. A more effective approach for security requirement engineering is needed to provide a more systematic way for eliciting adequate security requirements. This paper proposes a methodology for security requirement elicitation based on problem frames. The methodology aims at early integration of security with software development. The main goal of the methodology is to assist developers elicit adequate security requirements in a more systematic way during the requirement engineering process. A security catalog, based on the problem frames, is constructed in order to help identifying security requirements with the aid of previous security knowledge. Abuse frames are used to model threats while security problem frames are used to model security requirements. We have made use of evaluation criteria to evaluate the resulting security requirements concentrating on conflicts identification among requirements. We have shown that more complete security requirements can be elicited by such methodology in addition to the assistance offered to developers to elicit security requirements in a more systematic way.

  8. Capturing security requirements for software systems

    Directory of Open Access Journals (Sweden)

    Hassan El-Hadary

    2014-07-01

    Full Text Available Security is often an afterthought during software development. Realizing security early, especially in the requirement phase, is important so that security problems can be tackled early enough before going further in the process and avoid rework. A more effective approach for security requirement engineering is needed to provide a more systematic way for eliciting adequate security requirements. This paper proposes a methodology for security requirement elicitation based on problem frames. The methodology aims at early integration of security with software development. The main goal of the methodology is to assist developers elicit adequate security requirements in a more systematic way during the requirement engineering process. A security catalog, based on the problem frames, is constructed in order to help identifying security requirements with the aid of previous security knowledge. Abuse frames are used to model threats while security problem frames are used to model security requirements. We have made use of evaluation criteria to evaluate the resulting security requirements concentrating on conflicts identification among requirements. We have shown that more complete security requirements can be elicited by such methodology in addition to the assistance offered to developers to elicit security requirements in a more systematic way.

  9. Capturing security requirements for software systems

    Science.gov (United States)

    El-Hadary, Hassan; El-Kassas, Sherif

    2014-01-01

    Security is often an afterthought during software development. Realizing security early, especially in the requirement phase, is important so that security problems can be tackled early enough before going further in the process and avoid rework. A more effective approach for security requirement engineering is needed to provide a more systematic way for eliciting adequate security requirements. This paper proposes a methodology for security requirement elicitation based on problem frames. The methodology aims at early integration of security with software development. The main goal of the methodology is to assist developers elicit adequate security requirements in a more systematic way during the requirement engineering process. A security catalog, based on the problem frames, is constructed in order to help identifying security requirements with the aid of previous security knowledge. Abuse frames are used to model threats while security problem frames are used to model security requirements. We have made use of evaluation criteria to evaluate the resulting security requirements concentrating on conflicts identification among requirements. We have shown that more complete security requirements can be elicited by such methodology in addition to the assistance offered to developers to elicit security requirements in a more systematic way. PMID:25685514

  10. Rapid quality assurance with requirements smells

    OpenAIRE

    Femmer, Henning; Méndez Fernández, Daniel; Wagner, Stefan; Eder, Sebastian

    2016-01-01

    Context: Bad requirements quality can cause expensive consequences during the software development lifecycle, especially if iterations are long and feedback comes late. Objectives: We aim at a light-weight static requirements analysis approach that allows for rapid checks immediately when requirements are written down. Method: We transfer the concept of code smells to Requirements Engineering as Requirements Smells. To evaluate the benefits and limitations, we define Requirements Smells, real...

  11. National Ignition Facility site requirements

    International Nuclear Information System (INIS)

    1996-07-01

    The Site Requirements (SR) provide bases for identification of candidate host sites for the National Ignition Facility (NIF) and for the generation of data regarding potential actual locations for the facilities. The SR supplements the NIF Functional Requirements (FR) with information needed for preparation of responses to queries for input to HQ DOE site evaluation. The queries are to include both documents and explicit requirements for the potential host site responses. The Sr includes information extracted from the NIF FR (for convenience), data based on design approaches, and needs for physical and organization infrastructure for a fully operational NIF. The FR and SR describe requirements that may require new construction or may be met by use or modification of existing facilities. The SR do not establish requirements for NIF design or construction project planning. The SR document does not constitute an element of the NIF technical baseline

  12. Writing testable software requirements

    Energy Technology Data Exchange (ETDEWEB)

    Knirk, D. [Sandia National Labs., Albuquerque, NM (United States)

    1997-11-01

    This tutorial identifies common problems in analyzing requirements in the problem and constructing a written specification of what the software is to do. It deals with two main problem areas: identifying and describing problem requirements, and analyzing and describing behavior specifications.

  13. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man-month study, jointly funded by EPRI and McDonnell Douglas Astronautics Company-EAST, was undertaken to identify the utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980's. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980's. The issues are not meant to reflect a negative view of fusion, but are items which must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980's were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  14. Physician Requirements-1990. For Cardiology.

    Science.gov (United States)

    Tracy, Octavious; Birchette-Pierce, Cheryl

    Professional requirements for physicians specializing in cardiology were estimated to assist policymakers in developing guidelines for graduate medical education. The determination of physician requirements was based on an adjusted needs rather than a demand or utilization model. For each illness, manpower requirements were modified by the…

  15. Requirements Elicitation Problems: A Literature Analysis

    Directory of Open Access Journals (Sweden)

    Bill Davey

    2015-06-01

    Full Text Available Requirements elicitation is the process through which analysts determine the software requirements of stakeholders. Requirements elicitation is seldom well done, and an inaccurate or incomplete understanding of user requirements has led to the downfall of many software projects. This paper proposes a classification of problem types that occur in requirements elicitation. The classification has been derived from a literature analysis. Papers reporting on techniques for improving requirements elicitation practice were examined for the problem the technique was designed to address. In each classification the most recent or prominent techniques for ameliorating the problems are presented. The classification allows the requirements engineer to be sensitive to problems as they arise and the educator to structure delivery of requirements elicitation training.

  16. Volpe Aircraft Noise Certification DGPS Validation/Audit General Information, Data Submittal Guidelines, and Process Details; Letter Report V324-FB48B3-LR5

    Science.gov (United States)

    2018-01-09

    As required by Federal Aviation Administration Order 8110.4C, Type Certification Process, the Volpe Center Acoustics Facility (Volpe), in support of the Federal Aviation Administration Office of Environment and Energy (AEE), has completed valid...

  17. Estimating ISABELLE shielding requirements

    International Nuclear Information System (INIS)

    Stevens, A.J.; Thorndike, A.M.

    1976-01-01

    Estimates were made of the shielding thicknesses required at various points around the ISABELLE ring. Both hadron and muon requirements are considered. Radiation levels at the outside of the shield and at the BNL site boundary are kept at or below 1000 mrem per year and 5 mrem/year respectively. Muon requirements are based on the Wang formula for pion spectra, and the hadron requirements on the hadron cascade program CYLKAZ of Ranft. A muon shield thickness of 77 meters of sand is indicated outside the ring in one area, and hadron shields equivalent to from 2.7 to 5.6 meters in thickness of sand above the ring. The suggested safety allowance would increase these values to 86 meters and 4.0 to 7.2 meters respectively. There are many uncertainties in such estimates, but these last figures are considered to be rather conservative

  18. Technical evaluation report on the proposed amendment to the technical specifications on the reactor protection system and the engineered safety features actuation system for Ft. Calhoun, Unit No. 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1982-01-01

    This report documents the technical evaluation of the application to amend the Technical Specifications for the Ft. Calhoun Unit No. 1 Nuclear Generating Plant. The review criteria are based on the Technical Specifications of St. Lucie and Calvert Cliffs, IEEE Standards, Combustion Engineering Standard Technical Specifications, and the Code of Federal Regulations. The evaluation compares the submittal made by the licensee with the NRC staff position and the review criteria and presents the reviewer's conclusion on the acceptability of the application to amend the Technical Specifications

  19. Core damage frequency (reactor design) perspectives based on IPE results

    International Nuclear Information System (INIS)

    Camp, A.L.; Dingman, S.E.; Forester, J.A.

    1996-01-01

    This paper provides perspectives gained from reviewing 75 Individual Plant Examination (IPE) submittals covering 108 nuclear power plant units. Variability both within and among reactor types is examined to provide perspectives regarding plant-specific design and operational features, and C, modeling assumptions that play a significant role in the estimates of core damage frequencies in the IPEs. Human actions found to be important in boiling water reactors (BWRs) and in pressurized water reactors (PWRs) are presented and the events most frequently found important are discussed

  20. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-03-01

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  1. Navy Construction Contract Regulations versus the Board of Contract Appeals.

    Science.gov (United States)

    1987-12-01

    This is unfortunate because the amount of useful knowledge in the cases is vast, but the access to it is time- comsuming . The selection of the cases is...AlE) was out of town. This figure cannot be used blindly. Other factors such as Government behavior , contractor behavior , or nature of the submittal...job. To complicate matters, t "h C (-,n t r a c:i n:; I:Dict.r may not be aware of th_ contractor’ h.me _.f... overhead behavior . The alternative Is

  2. Range Flight Safety Requirements

    Science.gov (United States)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  3. Top-tier requirements for KNGR

    International Nuclear Information System (INIS)

    Sung-Jae, Ch.; Kwangho, L.; Dong Wook, J.

    1996-01-01

    In 1992, Korea Electric Power Corporation (KEPCO) has launched the next generation reactor project to develop the standard design of an advanced pressurized water reactor by 2000. This advanced reactor aims to have the sufficient capability to be a safe, environmentally sound and economical energy source for 2000's in Korea. In conjunction with the project development, the program phase I is studied and it is in the Korean Next Generation Reactor (KNGR) first phase project that the requirements of this specification called ''Top-tier'' have been established. These functional requirements are of the first importance for the design, construction and operation of a nuclear power plant. These requirements are divided into safety requirements, serious accidents control, design base requirements, definition of the system characteristics, performance, construction feasibility, economical objectives, site parameters and design processes. The ''Top-tier'' requirements are concentrated on the improvement of the safety and reliability. Safety is one of the first priorities. In particular, the requirements for the design of the next reactors generation must include the capacity to control serious accidents because when an accident occurs, the protection degree is crucial. The KNGR requirements include the existing nuclear power plants competitiveness as well as those of the coal thermal plants. Moreover, when safety is reinforced, the economic competitiveness can be assured. At the present time, a subsequent specification for the KNGR considering the bases of the domestic technology and experimenting the running. (O.M.)

  4. World enrichment requirements to 2005

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The primary enrichment suppliers-Eurodif, Techsnabexport, Urenco, and the US DOE - are positioning themselves to take advantage of the post - 1995 market. Overall, unfilled requirements represent about 40 percent of world requirements in the year 2000. The USA will be the primary market, as US utilities' unfilled enrichment requirements account for over 60 percent of the world's total unfilled requirements. The enrichment market is moving toward more global competition, as each supplier tries to maintain its current regional market base and then to capture additional market share in other regions

  5. The NLC Software Requirements Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Shoaee, Hamid

    2002-08-20

    We describe the software requirements and development methodology developed for the NLC control system. Given the longevity of that project, and the likely geographical distribution of the collaborating engineers, the planned requirements management process is somewhat more formal than the norm in high energy physics projects. The short term goals of the requirements process are to accurately estimate costs, to decompose the problem, and to determine likely technologies. The long term goal is to enable a smooth transition from high level functional requirements to specific subsystem and component requirements for individual programmers, and to support distributed development. The methodology covers both ends of that life cycle. It covers both the analytical and documentary tools for software engineering, and project management support. This paper introduces the methodology, which is fully described in [1].

  6. Requirements for Ion Sources

    International Nuclear Information System (INIS)

    Scrivens, R

    2013-01-01

    Ion sources produce beams for a large variety of different physical experiments, industrial processes and medical applications. In order to characterize the beam delivered by them, a list of requirements is necessary. In this chapter the list of principal requirements is specified and definitions for them are given. (author)

  7. Entrepreneurial learning requires action

    DEFF Research Database (Denmark)

    Brink, Tove; Madsen, Svend Ole

    2014-01-01

    that is enhanced by essential large-scale industry players and other SME managers are required to create action and value in learning. An open-mindedness to new learning approaches by SME managers and an open-mindedness to multi- and cross-disciplinary collaboration with SME managers by facilitators is required....

  8. Specifying semantic information on functional requirements

    OpenAIRE

    YAO, WUPING

    2012-01-01

    Requirements engineering is a challenging process in software development projects. Requirements, in general, are documented in natural language. They often have issues related to ambiguity, completeness and consistency. How to improve the quality of requirements documentation remains a classic research topic. This research aims at improving the way of editing and documenting functional requirements. We propose a meta-model to specify the semantic information of functional requirements, and d...

  9. Regulatory guidance document

    International Nuclear Information System (INIS)

    1994-05-01

    The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM's evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7

  10. Requirements management at Westinghouse Electric Company

    International Nuclear Information System (INIS)

    Gustavsson, Henrik

    2014-01-01

    Field studies and surveys made in various industry branches support the Westinghouse opinion that qualitative systems engineering and requirements management have a high value in the development of complex systems and products. Two key issues causing overspending and schedule delays in projects are underestimation of complexity and misunderstandings between the different sub-project teams. These issues often arise when a project jumps too early into detail design. Good requirements management practice before detail design helps the project teams avoid such issues. Westinghouse therefore puts great effort into requirements management. The requirements management methodology at Westinghouse rests primarily on four key cornerstones: 1 - Iterative team work when developing requirements specifications, 2 - Id number tags on requirements, 3 - Robust change routine, and 4 - Requirements Traceability Matrix. (authors)

  11. submitter BREIT code: Analytical solution of the balance rate equations for charge-state evolutions of heavy-ion beams in matter

    CERN Document Server

    Winckler, N; Shevelko, V P; Al-Turany, M; Kollegger, T; Stöhlker, Th

    2017-01-01

    A detailed description of a recently developed BREIT computer code (Balance Rate Equations of Ion Transportation) for calculating charge-state fractions of ion beams passing through matter is presented. The code is based on the analytical solutions of the differential balance equations for the charge-state fractions as a function of the target thickness and can be used for calculating the ion evolutions in gaseous, solid and plasma targets. The BREIT code is available on-line and requires the charge-changing cross sections and initial conditions in the input file. The eigenvalue decomposition method, applied to obtain the analytical solutions of the rate equations, is described in the paper. Calculations of non-equilibrium and equilibrium charge-state fractions, performed by the BREIT code, are compared with experimental data and results of other codes for ion beams in gaseous and solid targets. Ability and limitations of the BREIT code are discussed in detail.

  12. Role of Interdisciplinary Cooperation in Process of Documentation of Cultural Heritage

    Directory of Open Access Journals (Sweden)

    Jindřich Hodač

    2011-12-01

    Full Text Available This paper is focused on presentation of results of long-term interdisciplinary cooperation in a process of documentation of Cultural Heritage. There are two sides joined in this cooperation. The first side is a ,,submitter” - in our case it means architect-historian (Mr. Rykl. The second side is a ,,contractor” - in our case it means surveyorphotogrammetrist (Mr. Hodač and his students. We are cooperating mostly on projects of metrical documentation of Culture Heritage buildings and sites. Our cooperation is realizing mainly in bachelor„s/master’s projects. Other opportunity for our collaboration is our course [1]. We are offering this course to students of two faculties/specializations (surveyors + architects. Beside the wide range of real results (2D drawings, 3D models, photomaps etc. we also collected quite a lot of experience with process of collaboration itself. Cooperation and communication of submitter and contactor are playing key roles for successful project. It is possible to generally expect that submitter will give the ,,task” and contractor will try to find proper technology to solve it. The process of communication should be permanent because new circumstances and findings are arising all the time. It is very important for all together to find common language across specializations to understand each other. Surveyors are ,,slightly pressed” to get more knowledge about historical building constructions. Architects-historians should get basic awareness about various recent technologies for metrical documentation and its ,,pros and cons”.

  13. IPE Data Base: Plant design, core damage frequency and containment performance information

    International Nuclear Information System (INIS)

    Lehner, J.; Lin, C.C.; Pratt, W.T.; Su, T.; Danziger, L.

    1995-01-01

    This data base stores data obtained from the Individual Plant Examinations (IPEs) which licensees of nuclear power plants have conducted in response to NRC's Generic Letter GL88-20. The IPE Data Base is a collection of linked files which store information about plant design, core damage frequency, and containment performance in a uniform, structured way. The information contined in the various files is based on data contained in the IPE submittals. The information extracted from the submittals and entered into the IPE Data Base can be maniulated so that queries regarding individual or groups of plants can be answered using the IPE Data Base. The IPE Data Base supports detailed inquiries into the characteristics of individual plants or classes of plants. Progress has been made on the IPE Data Base and it is largely complete. Recent focus has been the development of a user friendly version which is menu driven and allows the user to ask queries of varying complexity easily, without the need to become familiar with particular data base formats or conventions such as those of DBase IV or Microsoft Access. The user can obtain the information he desired by quickly moving through a series of on-screen menus and ''clicking'' on appropriate choices. In this way even a first time user can benefit from the large amount of information stored in the IPE Data Base without the need of a learning period

  14. Due diligence responsibilities of the professional geologist

    International Nuclear Information System (INIS)

    Hobbs, G.W.

    1991-01-01

    Whether in the role of independent consultant or company employee, a geologist has certain professional obligations in the evaluation of an oil and gas submittal from a third party. 'Due diligence' is the term used to describe the analysis of an investment opportunity. Due diligence involves a multidisciplinary examination of both the technical and business aspects of a submittal. In addition to the obvious geological considerations, prospect evaluations should include relevant details about the specific technical documentation reviewed, information sources, and how the data were verified. Full disclosure of ownership, technical risks, and negative aspects of the prospect should be included along with the positive elements. After the geological analysis is completed, the economic merits of the prospect should be analyzed, incorporating all lease burdens and terms of participation into the calculations. Estimated exploration, development, and operating costs, together with projected annual production, cash flow, and reserves must be examined as to their reasonableness. Finally, the due diligence review should include a thorough check on the reputation, financial condition, technical and managerial expertise, and prior track record of the operator. Bank, trade, legal, and prior partner references should be contacted. The successful professional geologist in today's competitive world must have multidisciplinary skills. A solid background in geology and geophysics, a basic understanding of the principles of petroleum engineering and economics, and the wits of a private eye are needed for good due diligence work

  15. Submissions to the Australian and New Zealand Review of Food Labelling Law and Policy support traffic light nutrition labelling.

    Science.gov (United States)

    White, John; Signal, Louise

    2012-10-01

    Food labels to support healthier choices are an important potential intervention for improving population health by reducing obesity and diet-related disease. This study examines the use of research evidence about traffic light nutrition labelling in submissions to the Review of Food Labelling Law and Policy conducted in Australia and New Zealand. Content analysis of final submissions to the Review and a literature review of documents reporting research evidence about traffic light labelling. Sixty-two submitters to the Review were categorised as 'supporters' of traffic light labelling and 29 as 'opponents'. Supporters focused on studies showing traffic light labels were better than other systems at helping consumers identify healthier food options. Opponents cited evidence that traffic light labels were no better than other systems in this respect and noted a lack of evidence that they led to changes in food consumption. A literature review demonstrated that, as a group, submitters had drawn attention to most of the relevant research evidence on traffic light labelling. Both supporters and opponents were, however, selective in their use of evidence. The weight of evidence suggested that traffic light labelling has strengths in helping consumers to identify healthier food options. Further research would be valuable in informing the development of an interpretive front-of-pack labelling system. The findings have significant implications for the development of front-of-pack nutrition labelling currently being considered in Australia and New Zealand. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  16. Design requirement on HYPER blanket fuel assembly

    International Nuclear Information System (INIS)

    Hwang, Woan; Lee, B. O.; Nam, C.; Ryu, W. S.; Lee, B. S.; Park, W. S.

    2000-07-01

    This document describes design requirements which are needed for designing the blanket assembly of the HYPER as design guidance. The blanket assembly of the HYPER consists of blanket fuel rods, mounting rail, spacer, upper nozzle with handling socket, bottom nozzle with mounting rail and skeleton structure. The blanket fuel rod consists of top end plug, bottom end plug with key way, blanket fuel slug, and cladding. In the assembly, the rods are in a triangular pitch array. This report contains functional requirements, performance and operational requirements, interfacing systems requirements, core restraint and interface requirements, design limits and strength requirements, system configuration and essential feature requirements, seismic requirements, structural requirements, environmental requirements, reliability and safety requirements, standard and codes, QA programs, and other requirements for the blanket fuel assembly of the HYPER

  17. 40 CFR 141.70 - General requirements.

    Science.gov (United States)

    2010-07-01

    ...) NATIONAL PRIMARY DRINKING WATER REGULATIONS Filtration and Disinfection § 141.70 General requirements. (a... regulations establish criteria under which filtration is required as a treatment technique for public water... filtration requirements in § 141.73 and the disinfection requirements in § 141.72(b). (c) Each public water...

  18. 20 CFR 655.152 - Advertising requirements.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Advertising requirements. 655.152 Section 655... Employment in the United States (H-2A Workers) Post-Acceptance Requirements § 655.152 Advertising requirements. All advertising conducted to satisfy the required recruitment activities under § 655.151 must...

  19. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all SST and DST waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm ESD implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations/Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  20. Data Crosscutting Requirements Review

    Energy Technology Data Exchange (ETDEWEB)

    Kleese van Dam, Kerstin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Shoshani, Arie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Plata, Charity [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-04-01

    In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

  1. 46 CFR 11.707 - Examination requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Examination requirements. 11.707 Section 11.707 Shipping... OFFICER ENDORSEMENTS Professional Requirements for Pilots § 11.707 Examination requirements. (a) An... required to pass the examination described in subpart I of this part. (b) An applicant for an extension of...

  2. 21 CFR 1304.11 - Inventory requirements.

    Science.gov (United States)

    2010-04-01

    ... the inventory of the registered location to which they are subject to control or to which the person... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Inventory requirements. 1304.11 Section 1304.11... REGISTRANTS Inventory Requirements § 1304.11 Inventory requirements. (a) General requirements. Each inventory...

  3. Non-functional Avionics Requirements

    Science.gov (United States)

    Paulitsch, Michael; Ruess, Harald; Sorea, Maria

    Embedded systems in aerospace become more and more integrated in order to reduce weight, volume/size, and power of hardware for more fuel-effi ciency. Such integration tendencies change architectural approaches of system ar chi tec tures, which subsequently change non-functional requirements for plat forms. This paper provides some insight into state-of-the-practice of non-func tional requirements for developing ultra-critical embedded systems in the aero space industry, including recent changes and trends. In particular, formal requi re ment capture and formal analysis of non-functional requirements of avionic systems - including hard-real time, fault-tolerance, reliability, and per for mance - are exemplified by means of recent developments in SAL and HiLiTE.

  4. General review of quality assurance system requirements. The utility or customer requirement

    International Nuclear Information System (INIS)

    Fowler, J.L.

    1976-01-01

    What are the customer's Quality Assurance requirements and how does he convey these to his contractor, or apply them to himself. Many documents have been prepared mostly by countries with high technology availability and it is significant to note that many of the documents, particularly those of the United States of America, were prepared for nuclear safety related plant, but the logic of these documents equally applied to heavy engineering projects that are cost effective, and this is the current thinking and practice within the CEGB (Central Electricity Generating Board). Some documents have legislative backing, others rely on contractual disciplines, but they all appear to repeat the same basic requirements, so why does one continue to write more documents. The basic problem is that customers have to satisfy differing national legislative, economic and commercial requirements and, like all discerning customers, wish to reserve the right to satisfy their own needs, which are very often highly specialized. The CEGB are aware of this problem and are actively co-operating with most of the national and international authorities who are leading in this field, with a view to obtaining compatibility of requirements, but now there still remains the problem of satisfying national custom and practice. (author)

  5. Advanced Scientific Computing Research Network Requirements: ASCR Network Requirements Review Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Bacon, Charles [Argonne National Lab. (ANL), Argonne, IL (United States); Bell, Greg [ESnet, Berkeley, CA (United States); Canon, Shane [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dart, Eli [ESnet, Berkeley, CA (United States); Dattoria, Vince [Dept. of Energy (DOE), Washington DC (United States). Office of Science. Advanced Scientific Computing Research (ASCR); Goodwin, Dave [Dept. of Energy (DOE), Washington DC (United States). Office of Science. Advanced Scientific Computing Research (ASCR); Lee, Jason [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hicks, Susan [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holohan, Ed [Argonne National Lab. (ANL), Argonne, IL (United States); Klasky, Scott [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lauzon, Carolyn [Dept. of Energy (DOE), Washington DC (United States). Office of Science. Advanced Scientific Computing Research (ASCR); Rogers, Jim [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shipman, Galen [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Skinner, David [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Tierney, Brian [ESnet, Berkeley, CA (United States)

    2013-03-08

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 25 years. In October 2012, ESnet and the Office of Advanced Scientific Computing Research (ASCR) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the ASCR program office. The requirements identified at the review are summarized in the Findings section, and are described in more detail in the body of the report.

  6. submitter 16 T Nb$_{3}$Sn Racetrack Model Coil Test Result

    CERN Document Server

    Perez, J C; Bajko, M; Bottura, L; Bordini, B; Chiuchiolo, A; De Rijk, G; Ferracin, P; Feuvrier, J; Grosclaude, P; Juchno, M; Rochepault, E; Rysti, J; Sarasola, X

    2016-01-01

    In the framework of the European project EuCARD, the High Field Magnet project, led by a CERN-CEA collaboration, implied the development of a large aperture Nb$_{3}$Sn dipole magnet called FRESCA2. The magnet uses four double-pancake block-type coils, each about 1.5 m long. In order to characterize strand and cable properties, as well as to qualify the coil fabrication process, CERN started in 2012 the design and fabrication of the Racetrack Model Coil (RMC) magnet, a short model magnet using the same cable as FRESCA2 magnet with only two flat double-pancake coils about 0.8 m long. In 2013, two superconducting coils have been fabricated, making use of two different types of superconductor. In 2014 and 2015, the coils were tested both in a single and in a double-coil configuration in a support structure based on an external aluminum shell pre-loaded with water-pressurized bladders. In this paper, we describe the design of the RMC magnet and its coils, provide the main parameters of the superconductor, and repo...

  7. submitter Methodologies for the Statistical Analysis of Memory Response to Radiation

    CERN Document Server

    Bosser, Alexandre L; Tsiligiannis, Georgios; Frost, Christopher D; Zadeh, Ali; Jaatinen, Jukka; Javanainen, Arto; Puchner, Helmut; Saigne, Frederic; Virtanen, Ari; Wrobel, Frederic; Dilillo, Luigi

    2016-01-01

    Methodologies are proposed for in-depth statistical analysis of Single Event Upset data. The motivation for using these methodologies is to obtain precise information on the intrinsic defects and weaknesses of the tested devices, and to gain insight on their failure mechanisms, at no additional cost. The case study is a 65 nm SRAM irradiated with neutrons, protons and heavy ions. This publication is an extended version of a previous study [1].

  8. submitter Manufacture and Test of ITER 10-kA HTSCL Prototypes

    CERN Document Server

    Zhou, Tingzhi; Liu, Chenglian; Lu, Kun; Ran, Qingxiang; Song, Yuntao; Niu, Erwu; Bauer, Pierre; Devred, Arnaud; Lee, Seungje; Taylor, Thomas; Yang, Yifeng

    2016-01-01

    To carry current for the ITER correction coils, the 10-kA high-temperature superconducting current leads studied here are designed. Current leads provide the transition from 4.5-K low temperature to room temperature. This paper summarizes the major design features of the prototypes, which is followed by a discussion of the manufacturing and testing. The test results approved their excellent performance on low joint resistance and long loss-of-flow accident time. The overheating time, mass flow, and heat loads to 5-K ends also reached the expectation.

  9. submitter Simulation-Based Performance Analysis of the ALICE Mass Storage System

    CERN Document Server

    Vickovic, L; Celar, S

    2016-01-01

    CERN – the European Organization for Nuclear Research today, in the era of big data, is one of the biggest data generators in the world. Especially interesting is transient data storage system in the ALICE experiment. With the goal to optimize its performance this paper discusses a dynamic, discrete event simulation model of disk based Storage Area Network (SAN) and its usage for the performance analyses. Storage system model is based on modular, bottom up approach and the differences between measured and simulated values vary between 1.5 % and 4 % depending on the simulated component. Once finished, simulation model was used for detailed performance analyses. Among other findings it showed that system performances can be seriously affected if the array stripe size is larger than the size of cache on individual disks in the array, which so far has been completely ignored in the literature.

  10. submitter Flavour-changing neutral currents making and breaking the standard model

    CERN Document Server

    Archilli, F; Owen, P; Petridis, K A

    2017-01-01

    The standard model of particle physics is our best description yet of fundamental particles and their interactions, but it is known to be incomplete. As yet undiscovered particles and interactions might exist. One of the most powerful ways to search for new particles is by studying processes known as flavour-changing neutral current decays, whereby a quark changes its flavour without altering its electric charge. One example of such a transition is the decay of a beauty quark into a strange quark. Here we review some intriguing anomalies in these decays, which have revealed potential cracks in the standard model—hinting at the existence of new phenomena.

  11. submitter Studies of CMS data access patterns with machine learning techniques

    CERN Document Server

    De Luca, Silvia

    This thesis presents a study of the Grid data access patterns in distributed analysis in the CMS experiment at the LHC accelerator. This study ranges from the deep analysis of the historical patterns of access to the most relevant data types in CMS, to the exploitation of a supervised Machine Learning classification system to set-up a machinery able to eventually predict future data access patterns - i.e. the so-called dataset “popularity” of the CMS datasets on the Grid - with focus on specific data types. All the CMS workflows run on the Worldwide LHC Computing Grid (WCG) computing centers (Tiers), and in particular the distributed analysis systems sustains hundreds of users and applications submitted every day. These applications (or “jobs”) access different data types hosted on disk storage systems at a large set of WLCG Tiers. The detailed study of how this data is accessed, in terms of data types, hosting Tiers, and different time periods, allows to gain precious insight on storage occupancy ove...

  12. submitter Energy Resolution Of Si/Fe And Si/Pb Electromagnetic Calorimeters

    CERN Document Server

    Bosetti, M; Pensotti, S.; Penzo, A.; Rancoita, P.G.; Rattaggi, M.; Redaelli, M.; Salvato, G.; Terzi, G.

    1993-01-01

    The energy resolution of electromagnetic sampling calorimeters using silicon mosaics as active medium, has been measured for Pb and Fe absorbers at incoming electron energies E of 2, 4, and 6 GeV. The energy resolution, found for the Si/Pb sented by a(E)/E = pling frequency. The energy resolution can be rewritten as a function of the dead area energy losses (D): a(E)/E = (KO + all))% ,/- with KO = (17.6 f 0.3)%, (24.1&0.8)%, for Si/Pb, Si/Fe, respectively; a1 = 1.2f0.3 for both absorbers.

  13. 40 CFR 86.1712-99 - Maintenance of records; submittal of information.

    Science.gov (United States)

    2010-07-01

    ... number; (vi) NMOG standard to which the vehicle or truck is certified; and (vii) Information on the point... trucks subject to the provisions in this section is a violation of section 203(a)(1) of the Clean Air Act... effective until approval has been given by the Office of Management and Budget. ...

  14. submitter Triggering of a pressurized spark gap by a laser beam

    CERN Document Server

    Deutsch, F

    1968-01-01

    A delay line was discharged into a terminating resistor by a spark gap of coaxial design. The spark gap was triggered by a focused laser beam, introduced along the axis; a Q-switched ruby laser giving pulses of 20 ns duration and up to 50 MW power was used. The range of operation of the gap, formative time of the breakdown and jitter were investigated for different gases at pressures above atmospheric, gap widths of 4-10 mm and voltages of up to 120 kv. Mixtures of argon and nitrogen were found to have certain advantages, such as a low threshold for ionization by the laser beam, sufficient dielectric strength, low values of the formative-time jitter and chemical inertness. Formative times of down to about 1 ns and jitters below 1 ns were found. The laser power can be relatively low (0centerdot5-5 MW). An explanation for the breakdown mechanism is proposed.

  15. submitter Probing electric and magnetic fields with a Moiré deflectometer

    CERN Document Server

    Lansonneur, P; Demetrio, A; Müller, S R; Nedelec, P; Oberthaler, M K

    2017-01-01

    A new contact-free approach for measuring simultaneously electric and magnetic field is reported, which considers the use of a low energy ion source, a set of three transmission gratings and a position sensitive detector. Recently tested with antiprotons (Aghion et al., 2014) [1] at the CERN Antiproton Decelerator facility, this paper extends the proof of principle of a moiré deflectometer (Oberthaler et al., 1996) [2] for distinguishing electric from magnetic fields and opens the route to precision measurements when one is not limited by the ion source intensity. The apparatus presented, whose resolution is mainly limited by the shot noise is able to measure fields as low as 9 mVm−1 Hz−1/2 for electric component and 100 μG Hz−1/2 for the magnetic component. Scaled to 100 nm pitch for the gratings, accessible with current state-of-the-art technology [3], the moiré fieldmeter would be able to measure fields as low as 22 μVm−1 Hz−1/2 and 0.2 μG Hz−1/2.

  16. submitter Dissemination of data measured at the CERN n_TOF facility

    CERN Document Server

    Dupont, E; Cabellos, O; Aberle, O; Aerts, G; Altstadt, S; Alvarez, H; Alvarez-Velarde, F; Andriamonje, S; Andrzejewski, J; Audouin, L; Bacak, M; Badurek, G; Balibrea, J; Barbagallo, M; Barros, S; Baumann, P; Bécares, V; Bečvář, F; Beinrucker, C; Belloni, F; Berthier, B; Berthoumieux, E; Billowes, J; Boccone, V; Bosnar, D; Brown, A; Brugger, M; Caamaño, M; Calviani, M; Calviño, F; Cano-Ott, D; Capote, R; Cardella, R; Carrapiço, C; Casanovas, A; Castelluccio, D M; Cennini, P; Cerutti, F; Chen, Y H; Chiaveri, E; Chin, M; Colonna, N; Cortés, G; Cortés-Giraldo, M A; Cosentino, L; Couture, A; Cox, J; Damone, L A; David, S; Deo, K; Diakaki, M; Dillmann, I; Domingo-Pardo, C; Dressler, R; Dridi, W; Duran, I; Eleftheriadis, C; Embid-Segura, M; Fernández-Domínguez, B; Ferrant, L; Ferrari, A; Ferreira, P; Finocchiaro, P; Fraval, K; Frost, R J W; Fujii, K; Furman, W; Ganesan, S; Garcia, A R; Gawlik, A; Gheorghe, I; Gilardoni, S; Giubrone, G; Glodariu, T; Göbel, K; Gomez-Hornillos, M B; Goncalves, I F; Gonzalez-Romero, E; Goverdovski, A; Gramegna, F; Griesmayer, E; Guerrero, C; Gunsing, F; Gurusamy, P; Haight, R; Harada, H; Heftrich, T; Heil, M; Heinitz, S; Hernández-Prieto, A; Heyse, J; Igashira, M; Isaev, S; Jenkins, D G; Jericha, E; Kadi, Y; Kaeppeler, F; Kalamara, A; Karadimos, D; Karamanis, D; Katabuchi, T; Kavrigin, P; Kerveno, M; Ketlerov, V; Khryachkov, V; Kimura, A; Kivel, N; Kokkoris, M; Konovalov, V; Krtička, M; Kroll, J; Kurtulgil, D; Lampoudis, C; Langer, C; Leal-Cidoncha, E; Lederer, C; Leeb, H; Le Naour, C; Lerendegui-Marco, J; Leong, L S; Licata, M; Lo Meo, S; Lonsdale, S J; Losito, R; Lozano, M; Macina, D; Manousos, A; Marganiec, J; Martinez, T; Marrone, S; Masi, A; Massimi, C; Mastinu, P; Mastromarco, M; Matteucci, F; Maugeri, E A; Mazzone, A; Mendoza, E; Mengoni, A; Milazzo, P M; Mingrone, F; Mirea, M; Mondelaers, W; Montesano, S; Moreau, C; Mosconi, M; Musumarra, A; Negret, A; Nolte, R; O'Brien, S; Oprea, A; Palomo-Pinto, F R; Pancin, J; Paradela, C; Patronis, N; Pavlik, A; Pavlopoulos, P; Perkowski, J; Perrot, L; Pigni, M T; Plag, R; Plompen, A; Plukis, L; Poch, A; Porras, I; Praena, J; Pretel, C; Quesada, J M; Radeck, D; Rajeev, K; Rauscher, T; Reifarth, R; Riego, A; Robles, M; Roman, F; Rout, P C; Rudolf, G; Rubbia, C; Rullhusen, P; Ryan, J A; Sabaté-Gilarte, M; Salgado, J; Santos, C; Sarchiapone, L; Sarmento, R; Saxena, A; Schillebeeckx, P; Schmidt, S; Schumann, D; Sedyshev, P; Smith, A G; Sosnin, N V; Stamatopoulos, A; Stephan, C; Suryanarayana, S V; Tagliente, G; Tain, J L; Tarifeño-Saldivia, A; Tarrío, D; Tassan-Got, L; Tavora, L; Terlizzi, R; Tsinganis, A; Valenta, S; Vannini, G; Variale, V; Vaz, P; Ventura, A; Versaci, R; Vermeulen, M J; Villamarin, D; Vicente, M C; Vlachoudis, V; Vlastou, R; Voss, F; Wallner, A; Walter, S; Ware, T; Warren, S; Weigand, M; Weiß, C; Wolf, C; Wiesher, M; Wisshak, K; Woods, P J; Wright, T; Žugec, P

    2017-01-01

    The n_TOF neutron time-of-flight facility at CERN is used for high quality nuclear data measurements from thermal energy up to hundreds of MeV. In line with the CERN open data policy, the n_TOF Collaboration takes actions to preserve its unique data, facilitate access to them in standardised format, and allow their re-use by a wide community in the fields of nuclear physics, nuclear astrophysics and various nuclear technologies. The present contribution briefly describes the n_TOF outcomes, as well as the status of dissemination and preservation of n_TOF final data in the international EXFOR library.

  17. Design requirements for the new reactor

    International Nuclear Information System (INIS)

    Koski, S.

    2005-01-01

    This presentation deals with the safety related design requirements specified for the new nuclear power plant to be built in Finland (FINS). The legislation, codes and standards, on which the design requirements are based, can be arranged into a hierarchical pyramid as follows: The safety related design criteria are based on the three uppermost hierarchical levels: Finnish legislation (e.g. decisions of the State Council) Basic Regulations (75-INSAG-3, USNRC General Design Criteria) Process oriented nuclear documents (YVL- guides or corresponding US/German rules). The European Utility Requirements (EUR) document was used as the starting point for the writing of the design requirements document. The structure and headlines of EUR could be kept, but in many cases the contents had to be deleted and rewritten to correspond to the requirement level of the above codes and standards. This was the case, for example, with the requirements concerning safety classification or application of failure criteria. In the presentation, the most important safety related design criteria are reviewed, with an emphasis on those requirements which exceed the requirement level applied on the existing plant units. Some hints are also given on the main differences between Finnish and international safety requirements. (orig.)

  18. Capital Requirements and Credit Rationing

    OpenAIRE

    Itai Agur

    2010-01-01

    This paper analyzes the trade-off between financial stability and credit rationing that arises when increasing capital requirements. It extends the Stiglitz-Weiss model of credit rationing to allow for bank default. Bank capital structure then matters for lending incentives. With default and rationing endogenous, optimal capital requirements can be analyzed. Introducing bank financiers, the paper also shows that uninsured funding raises the sensitivity of rationing to capital requirements. In...

  19. National Land Imaging Requirements (NLIR) Pilot Project summary report: summary of moderate resolution imaging user requirements

    Science.gov (United States)

    Vadnais, Carolyn; Stensaas, Gregory

    2014-01-01

    Under the National Land Imaging Requirements (NLIR) Project, the U.S. Geological Survey (USGS) is developing a functional capability to obtain, characterize, manage, maintain and prioritize all Earth observing (EO) land remote sensing user requirements. The goal is a better understanding of community needs that can be supported with land remote sensing resources, and a means to match needs with appropriate solutions in an effective and efficient way. The NLIR Project is composed of two components. The first component is focused on the development of the Earth Observation Requirements Evaluation System (EORES) to capture, store and analyze user requirements, whereas, the second component is the mechanism and processes to elicit and document the user requirements that will populate the EORES. To develop the second component, the requirements elicitation methodology was exercised and refined through a pilot project conducted from June to September 2013. The pilot project focused specifically on applications and user requirements for moderate resolution imagery (5–120 meter resolution) as the test case for requirements development. The purpose of this summary report is to provide a high-level overview of the requirements elicitation process that was exercised through the pilot project and an early analysis of the moderate resolution imaging user requirements acquired to date to support ongoing USGS sustainable land imaging study needs. The pilot project engaged a limited set of Federal Government users from the operational and research communities and therefore the information captured represents only a subset of all land imaging user requirements. However, based on a comparison of results, trends, and analysis, the pilot captured a strong baseline of typical applications areas and user needs for moderate resolution imagery. Because these results are preliminary and represent only a sample of users and application areas, the information from this report should only

  20. Individual plant examination program aspirations and achievements

    International Nuclear Information System (INIS)

    Flack, J.H.

    1994-01-01

    An Individual Plant Examination (IPE) is a systematic examination of a nuclear power plant for vulnerabilities, or risk significant contributors. By mid 1994, all licensees of commercial nuclear power plants will have performed an IPE on their units. To date, the NRC staff has received sixty-three (80%) of the seventy-eight expected IPE submittals. Twelve IPE reviews are now complete, with twenty-two in various stages of review. This paper provides a preliminary overview and comparison of licensees IPEs to Commission objectives. Insights and findings stemming from the review program are also presented

  1. Assessment of Tidal Energy Removal Impacts on Physical Systems: Development of MHK Module and Analysis of Effects on Hydrodynamics

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Zhaoqing; Wang, Taiping

    2011-09-01

    In this report we describe (1) the development, test, and validation of the marine hydrokinetic energy scheme in a three-dimensional coastal ocean model (FVCOM); and (2) the sensitivity analysis of effects of marine hydrokinetic energy configurations on power extraction and volume flux in a coastal bay. Submittal of this report completes the work on Task 2.1.2, Effects of Physical Systems, Subtask 2.1.2.1, Hydrodynamics and Subtask 2.1.2.3, Screening Analysis, for fiscal year 2011 of the Environmental Effects of Marine and Hydrokinetic Energy project.

  2. Review of the Palisades pressure vessel accumulated fluence estimate and of the least squares methodology employed

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, P.J.

    1998-05-01

    This report provides a review of the Palisades submittal to the Nuclear Regulatory Commission requesting endorsement of their accumulated neutron fluence estimates based on a least squares adjustment methodology. This review highlights some minor issues in the applied methodology and provides some recommendations for future work. The overall conclusion is that the Palisades fluence estimation methodology provides a reasonable approach to a {open_quotes}best estimate{close_quotes} of the accumulated pressure vessel neutron fluence and is consistent with the state-of-the-art analysis as detailed in community consensus ASTM standards.

  3. Review of the Palisades pressure vessel accumulated fluence estimate and of the least squares methodology employed

    International Nuclear Information System (INIS)

    Griffin, P.J.

    1998-05-01

    This report provides a review of the Palisades submittal to the Nuclear Regulatory Commission requesting endorsement of their accumulated neutron fluence estimates based on a least squares adjustment methodology. This review highlights some minor issues in the applied methodology and provides some recommendations for future work. The overall conclusion is that the Palisades fluence estimation methodology provides a reasonable approach to a open-quotes best estimateclose quotes of the accumulated pressure vessel neutron fluence and is consistent with the state-of-the-art analysis as detailed in community consensus ASTM standards

  4. On creation of multilevel system of ecological monitoring and forecasting of status and stability of the environmental objects of the 'Baikanur' Space Site, and areas of falling of separated parts of rocket-carriers

    International Nuclear Information System (INIS)

    Sujmenbaev, B.T.; Ermoldina, G.T.; Kurbanova, R.A.; Ermoldina, Eh.T.

    2005-01-01

    In the article the ecological monitoring system of 'Baikanur' space station and areas of falling of separated parts of rocket-carriers providing carrying out of supervision of several levels is offered: a space segment (reception of the space information from satellites NOAA, TERRA, the Meteor-3M), aviation (aerial photograph from airborne and helicopters) and ground, submitters by stationary points of observation, (ecological control mobile laboratories). Monitoring system creation will allow to create uniform information space with the view of acceptance of administrative decisions and the control of ecological making space-rocket activity. (author)

  5. Assessment of Energy Removal Impacts on Physical Systems: Hydrodynamic Model Domain Expansion and Refinement, and Online Dissemination of Model Results

    International Nuclear Information System (INIS)

    Yang, Zhaoqing; Khangaonkar, Tarang; Wang, Taiping

    2010-01-01

    In this report we describe the (1) the expansion of the PNNL hydrodynamic model domain to include the continental shelf along the coasts of Washington, Oregon, and Vancouver Island; and (2) the approach and progress in developing the online/Internet disseminations of model results and outreach efforts in support of the Puget Sound Operational Forecast System (PS-OPF). Submittal of this report completes the work on Task 2.1.2, Effects of Physical Systems, Subtask 2.1.2.1, Hydrodynamics, for fiscal year 2010 of the Environmental Effects of Marine and Hydrokinetic Energy project.

  6. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  7. Requirements Analysis in the Value Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Conner, Alison Marie

    2001-05-01

    The Value Methodology (VM) study brings together a multidisciplinary team of people who own the problem and have the expertise to identify and solve it. With the varied backgrounds and experiences the team brings to the study, come different perspectives on the problem and the requirements of the project. A requirements analysis step can be added to the Information and Function Analysis Phases of a VM study to validate whether the functions being performed are required, either regulatory or customer prescribed. This paper will provide insight to the level of rigor applied to a requirements analysis step and give some examples of tools and techniques utilized to ease the management of the requirements and functions those requirements support for highly complex problems.

  8. UTM TCL2 Software Requirements

    Science.gov (United States)

    Smith, Irene S.; Rios, Joseph L.; McGuirk, Patrick O.; Mulfinger, Daniel G.; Venkatesan, Priya; Smith, David R.; Baskaran, Vijayakumar; Wang, Leo

    2017-01-01

    The Unmanned Aircraft Systems (UAS) Traffic Management (UTM) Technical Capability Level (TCL) 2 software implements the UTM TCL 2 software requirements described herein. These software requirements are linked to the higher level UTM TCL 2 System Requirements. Each successive TCL implements additional UTM functionality, enabling additional use cases. TCL 2 demonstrated how to enable expanded multiple operations by implementing automation for beyond visual line-of-sight, tracking operations, and operations flying over sparsely populated areas.

  9. Information requirements for enterprise systems

    OpenAIRE

    Sommerville, Ian; Lock, Russell; Storer, Tim

    2012-01-01

    In this paper, we discuss an approach to system requirements engineering, which is based on using models of the responsibilities assigned to agents in a multi-agency system of systems. The responsibility models serve as a basis for identifying the stakeholders that should be considered in establishing the requirements and provide a basis for a structured approach, described here, for information requirements elicitation. We illustrate this approach using a case study drawn from civil emergenc...

  10. Dosimeter characteristics and service performance requirements

    International Nuclear Information System (INIS)

    Ambrosi, P.; Bartlett, D.T.

    1999-01-01

    The requirements for personal dosimeters and dosimetry services given by ICRP 26, ICRP 35, ICRP 60 and ICRP 75 are summarised and compared with the requirements given in relevant international standards. Most standards could be made more relevant to actual workplace conditions. In some standards, the required tests of energy and angular dependence of the response are not sufficient, or requirements on overall uncertainty are lacking. (author)

  11. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  12. Requirements for Space Settlement Design

    Science.gov (United States)

    Gale, Anita E.; Edwards, Richard P.

    2004-02-01

    When large space settlements are finally built, inevitably the customers who pay for them will start the process by specifying requirements with a Request for Proposal (RFP). Although we are decades away from seeing the first of these documents, some of their contents can be anticipated now, and provide insight into the variety of elements that must be researched and developed before space settlements can happen. Space Settlement Design Competitions for High School students present design challenges in the form of RFPs, which predict basic requirements for space settlement attributes in the future, including structural features, infrastructure, living conveniences, computers, business areas, and safety. These requirements are generically summarized, and unique requirements are noted for specific space settlement locations and applications.

  13. Waste Acceptance System Requirements document (WASRD)

    International Nuclear Information System (INIS)

    1993-01-01

    This Waste Acceptance System Requirements document (WA-SRD) describes the functions to be performed and the technical requirements for a Waste Acceptance System for accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) into the Civilian Radioactive Waste Management System (CRWMS). This revision of the WA-SRD addresses the requirements for the acceptance of HLW. This revision has been developed as a top priority document to permit DOE's Office of Environmental Restoration and Waste Management (EM) to commence waste qualification runs at the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) in a timely manner. Additionally, this revision of the WA-SRD includes the requirements from the Physical System Requirements -- Accept Waste document for the acceptance of SNF. A subsequent revision will fully address requirements relative to the acceptance of SNF

  14. Mined Geologic Disposal System Requirements Document

    International Nuclear Information System (INIS)

    1993-01-01

    This Mined Geologic Disposal System Requirements document (MGDS-RD) describes the functions to be performed by, and the requirements for, a Mined Geologic Disposal System (MGDS) for the permanent disposal of spent nuclear fuel (SNF) and commercial and defense high level radioactive waste (HLW) in support of the Civilian Radioactive Waste Management System (CRWMS). The development and control of the MGDS-RD is quality-affecting work and is subject to the Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance Requirements Document (QARD). As part of the technical requirements baseline, it is also subject to Baseline Management Plan controls. The MGDS-RD and the other program-level requirements documents have been prepared and managed in accordance with the Technical Document Preparation Plan (TDPP) for the Preparation of System Requirements Documents

  15. Requirements Modeling with the Aspect-oriented User Requirements Notation (AoURN): A Case Study

    Science.gov (United States)

    Mussbacher, Gunter; Amyot, Daniel; Araújo, João; Moreira, Ana

    The User Requirements Notation (URN) is a recent ITU-T standard that supports requirements engineering activities. The Aspect-oriented URN (AoURN) adds aspect-oriented concepts to URN, creating a unified framework that allows for scenario-based, goal-oriented, and aspect-oriented modeling. AoURN is applied to the car crash crisis management system (CCCMS), modeling its functional and non-functional requirements (NFRs). AoURN generally models all use cases, NFRs, and stakeholders as individual concerns and provides general guidelines for concern identification. AoURN handles interactions between concerns, capturing their dependencies and conflicts as well as the resolutions. We present a qualitative comparison of aspect-oriented techniques for scenario-based and goal-oriented requirements engineering. An evaluation carried out based on the metrics adapted from literature and a task-based evaluation suggest that AoURN models are more scalable than URN models and exhibit better modularity, reusability, and maintainability.

  16. 7 CFR 4284.18 - Audit requirements.

    Science.gov (United States)

    2010-01-01

    ... Grant Programs § 4284.18 Audit requirements. Grantees must comply with the audit requirements of 7 CFR part 3052. The audit requirements apply to the years in which grant funds are received and years in...

  17. Puberty menorrhagia Requiring Inpatient Admission

    Directory of Open Access Journals (Sweden)

    AH Khosla

    2010-06-01

    Full Text Available INTRODUCTION: Puberty menorrhagia is a significant health problem in adolescent age group and severe cases may require admission and blood transfusion. Aim of this study was to evaluate the causes, associated complications and management of puberty menorrhagia. METHODS: Hospital records of all patients of puberty menorrhagia requiring admission were analyzed for etiology, duration since menarche, duration of bleeding, investigation profile and management. RESULTS: There were 18 patients of puberty menorrhagia requiring hospital admission. Etiology was anovulatory bleeding in 11 patients, bleeding disorders in five which included idiopathic thrombocytopenia purpura in three and one each with Von-Willebrand disease and leukemia. Two patients had hypothyroidism as the cause. Fourteen patients presented with severe anaemia and required blood transfusion. All except one responded to oral hormonal therapy. CONCLUSIONS: Puberty menorrhagia can be associated with severe complications and requiring blood transfusion. Although most common cause is anovulation but bleeding disorder, other medical condition and other organic causes must be ruled out in any patient of Puberty menorrhagia. KEYWORDS: anovulation, bleeding disorder, puberty, menorrhagia, anaemia.

  18. The JPL functional requirements tool

    Science.gov (United States)

    Giffin, Geoff; Skinner, Judith; Stoller, Richard

    1987-01-01

    Planetary spacecraft are complex vehicles which are built according to many thousands of requirements. Problems encountered in documenting and maintaining these requirements led to the current attempt to reduce or eliminate these problems by a computer automated data base Functional Requirements Tool. The tool developed at JPL and in use on several JPL Projects is described. The organization and functionality of the Tool, together with an explanation of the data base inputs, their relationships, and use are presented. Methods of interfacing with external documents, representation of tables and figures, and methods of approval and change processing are discussed. The options available for disseminating information from the Tool are identified. The implementation of the Requirements Tool is outlined, and the operation is summarized. The conclusions drawn from this work is that the Requirements Tool represents a useful addition to the System Engineer's Tool kit, it is not currently available elsewhere, and a clear development path exists to expand the capabilities of the Tool to serve larger and more complex projects.

  19. NP Science Network Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Dart, Eli [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); Rotman, Lauren [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); Tierney, Brian [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  20. Next Generation Microbiology Requirements

    Science.gov (United States)

    Ott, C. M.; Oubre, C. M.; Elliott, T. F.; Castro, V. A.; Pierson, D. L.

    2012-01-01

    As humans continue to explore deep into space, microorganisms will travel with them. The primary means to mitigate the risk of infectious disease are a combination of prudent spacecraft design and rigorous operational controls. The effectiveness of these methods are evaluated by microbiological monitoring of spacecraft, food, water, and the crew that is performed preflight, in-flight, and post-flight. Current NASA requirements associated with microbiological monitoring are based on culture-based methodology where microorganisms are grown on a semi-solid growth medium and enumerated. Subsequent identification of the organisms requires specialized labor and large equipment, which historically has been performed on Earth. Requirements that rely strictly on culture-based units limit the use of non-culture based monitoring technology. Specifically, the culture-based "measurement criteria" are Colony Forming Units (CFU, representing the growth of one microorganism at a single location on the agar medium) per a given volume, area, or sample size. As the CFU unit by definition is culture-based, these requirements limit alternative technologies for spaceflight applications. As spaceflight missions such as those to Mars extend further into space, culture-based technology will become difficult to implement due to the (a) limited shelf life of the culture media, (b) mass/volume necessary to carry these consumables, and (c) problems associated with the production of biohazardous material in the habitable volume of the spacecraft. In addition, an extensive amount of new knowledge has been obtained during the Space Shuttle, NASA-Mir, and International Space Station Programs, which gave direction for new or modified microbial control requirements for vehicle design and mission operations. The goal of this task is to develop and recommend a new set of requirements for vehicle design and mission operations, including microbiological monitoring, based upon "lessons learned" and new