WorldWideScience

Sample records for subcontractors hasqard requirements

  1. Hanford analytical services quality assurance requirements documents. Volume 1: Administrative Requirements

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1997-01-01

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  2. Environment, Health, and Safety - Construction Subcontractors Documents |

    Science.gov (United States)

    NREL Environment, Health, and Safety - Construction Subcontractors Documents Environment Environment, Health and Safety (EH&S) requirements are understood by construction subcontractors and with these requirements before submitting proposals and/or environment, health and safety plans for the

  3. Predicting Subcontractor Performance Using Web-Based Evolutionary Fuzzy Neural Networks

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2013-01-01

    Full Text Available Subcontractor performance directly affects project success. The use of inappropriate subcontractors may result in individual work delays, cost overruns, and quality defects throughout the project. This study develops web-based Evolutionary Fuzzy Neural Networks (EFNNs to predict subcontractor performance. EFNNs are a fusion of Genetic Algorithms (GAs, Fuzzy Logic (FL, and Neural Networks (NNs. FL is primarily used to mimic high level of decision-making processes and deal with uncertainty in the construction industry. NNs are used to identify the association between previous performance and future status when predicting subcontractor performance. GAs are optimizing parameters required in FL and NNs. EFNNs encode FL and NNs using floating numbers to shorten the length of a string. A multi-cut-point crossover operator is used to explore the parameter and retain solution legality. Finally, the applicability of the proposed EFNNs is validated using real subcontractors. The EFNNs are evolved using 22 historical patterns and tested using 12 unseen cases. Application results show that the proposed EFNNs surpass FL and NNs in predicting subcontractor performance. The proposed approach improves prediction accuracy and reduces the effort required to predict subcontractor performance, providing field operators with web-based remote access to a reliable, scientific prediction mechanism.

  4. Predicting subcontractor performance using web-based Evolutionary Fuzzy Neural Networks.

    Science.gov (United States)

    Ko, Chien-Ho

    2013-01-01

    Subcontractor performance directly affects project success. The use of inappropriate subcontractors may result in individual work delays, cost overruns, and quality defects throughout the project. This study develops web-based Evolutionary Fuzzy Neural Networks (EFNNs) to predict subcontractor performance. EFNNs are a fusion of Genetic Algorithms (GAs), Fuzzy Logic (FL), and Neural Networks (NNs). FL is primarily used to mimic high level of decision-making processes and deal with uncertainty in the construction industry. NNs are used to identify the association between previous performance and future status when predicting subcontractor performance. GAs are optimizing parameters required in FL and NNs. EFNNs encode FL and NNs using floating numbers to shorten the length of a string. A multi-cut-point crossover operator is used to explore the parameter and retain solution legality. Finally, the applicability of the proposed EFNNs is validated using real subcontractors. The EFNNs are evolved using 22 historical patterns and tested using 12 unseen cases. Application results show that the proposed EFNNs surpass FL and NNs in predicting subcontractor performance. The proposed approach improves prediction accuracy and reduces the effort required to predict subcontractor performance, providing field operators with web-based remote access to a reliable, scientific prediction mechanism.

  5. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  6. Technological Collaboration in International Subcontractor Relationships

    DEFF Research Database (Denmark)

    Andersen, Poul Houman

    1998-01-01

    The utilization of relationship-oriented practices differ among subcontractors, based on their export propensity and orientation towards innovation.......The utilization of relationship-oriented practices differ among subcontractors, based on their export propensity and orientation towards innovation....

  7. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  8. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  9. Control of subcontractors by civil works contractor for a nuclear power plant

    International Nuclear Information System (INIS)

    Jiang Xinguo

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail

  10. Control of subcontractors by civil works contractor for a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Xinguo, Jiang [Huaxing Construction Company, Yizheng, JS (China)

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail.

  11. SAFETY PERFORMANCE OF SUBCONTRACTORS IN THE PALESTINIAN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Adnan Enshassi

    2008-06-01

    Full Text Available Subcontractors perform most of the construction works and their effect on industry are apparent in different activities of construction. Therefore, subcontractors need more attention from government and contractors union. The aim of this paper is to identify, evaluate, and rank factors that influence safety performance of subcontractors in the Gaza Strip (Palestine according to their relative importance. The study concluded that reported accident rates will decrease among subcontractors and their workers if new workers are trained well in the work site and they are informed about dangerous places, and if a workable safety plan is well preplanned. The results also showed that reported accident rates increased among subcontractors when using old, unsafe equipment and due to the complexity or difficulty in the construction sites features. Owners and general contractors need to stipulate strict clauses for safety in the contract for improving safety record of subcontractors. Construction workers must receive proper job related safety and health training with a safety logbook. It is recommended that the subcontractors and workers should attend continuing safety programs on regular basis as part of their perquisite to work in construction sites.

  12. A FRAMEWORK FOR SUBCONTRACTOR INTEGRATION IN ALLIANCE CONTRACTS

    Directory of Open Access Journals (Sweden)

    Vilasini, Nimesha

    2012-04-01

    Full Text Available Project alliancing involves the active collaboration of construction project owners and non-owner participants (designer, contractors, and suppliers to deliver projects in an atmosphere of shared responsibilities and liabilities. Alliancing connotes integration but in real practice, it fails to create a true alliance environment since only part of the value chain (owner, designer, main contractor is considered for integration. Consequently subcontractors are very often left out of the key alliance. Therefore this study identifies improvement areas to current alliance practice and suggests changes that will permit critical sub-contracting processes to be integrated into a project’s main alliance. To achieve this objective the research follows a comparative study approach. Information obtained from relevant literature is used to identify current subcontractor management practices and best practices for subcontractor integration in alliances. A case study of an alliance project is used to identify improvement areas in subcontractor management practices in an alliance environment. From these findings, the study proposes a revised alliance framework that integrates subcontractors from the early stages in alliance contracts, thus enabling the realisation of benefits accruable to projects through early contractor involvement.

  13. Monitoring in service triads consisting of buyers, subcontractors and end customers

    NARCIS (Netherlands)

    Valk, van der W.; Iwaarden, van J.

    2011-01-01

    Organisations increasingly outsource service delivery to specialist subcontractors. These buyers, their subcontractors and their end customers operate in a triadic service relationship. In these triads, the buyer lacks direct control over service delivery and completely depends on the subcontractor

  14. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  15. A review of two recent occurrences at the Advanced Test Reactor involving subcontractor activities

    International Nuclear Information System (INIS)

    Dahlke, H.J.; Jensen, N.C.; Vail, J.A.

    1997-11-01

    This report documents the results of a brief, unofficial investigation into two incidents at the Idaho National Engineering and Environmental Laboratory (INEEL) Advanced Test Reactor (ATR) facility, reported on October 25 and 31, 1997. The first event was an unanticipated breach of confinement. The second involved reactor operation with an inoperable seismic scram subsystem, violating the reactor's Technical Specifications. These two incidents have been found to be unrelated. A third event that occurred on December 16, 1996, is also discussed because of its similarities to the first event listed above. Both of these incidents were unanticipated breaches of confinement, and both involved the work of construction subcontractor personnel. The cause for the subcontractor related occurrences is a work control process that fails to effectively interface with LMITCO management. ATR Construction Project managers work sufficient close with construction subcontractor personnel to understand planned day-to-day activities. They also have sufficient training and understanding of reactor operations to ensure adherence to applicable administrative requirements. However, they may not be sufficiently involved in the work authorization and control process to bridge an apparent communications gap between subcontractor employees and Facility Operations/functional support personnel for work inside the reactor facility. The cause for the inoperable seismic scram switch (resulting from a disconnected lead) is still under investigation. It does not appear to be subcontractor related

  16. The Effects of the Single Process Initiative on Aerospace Subcontractors

    National Research Council Canada - National Science Library

    Winicki, Anthony

    1998-01-01

    .... The methodology used to identify the apparent inequities faced by the subcontractors was a review of current literature and 40 telephone interviews with representatives of aerospace prime contractors and subcontractors...

  17. Subcontractors and increased risk for work-related diseases and absenteeism.

    Science.gov (United States)

    Min, Kyoung B; Park, Shin G; Song, Jae S; Yi, Kwan H; Jang, Tae W; Min, Jin Y

    2013-11-01

    Despite increasing reliance on subcontracting in many economic sectors, there is little information available on occupational health and safety issues among subcontractor employees. The purpose of this study was to investigate the effect of subcontracting on self-reported health problems and absences due to occupational accidents and sickness using a nationally representative sample from South Korea. The data used were sampled from the second wave of the Korean Working Conditions Survey [2010]. Information on 3,282 parent firm employees and 728 subcontractor employees was obtained. For the logistic regression model, the outcomes were work-related health problems and absenteeism. The independent variables were personal and occupational characteristics, job aspects, and working hazards. Subcontractor employees were significantly more likely to experience health problems than the employee at parent firms. In particular, subcontractors' risk of injuries and anxiety/depression increased twofold (odd ratios, OR=2.01, 95% confidence interval, CIs, 1.24-3.26) and threefold (OR=2.95, 95% CIs 1.52-5.73), respectively, after controlling for potential variables. In addition, subcontractor employees were three times more likely than employees at parent firms to miss work due to illness (OR=3.56; 95% CIs 2.02-6.26). Working conditions, especially those related to job aspects and workplace exposures, attenuated these risks. Subcontracting workers were found to have a higher risk of work-related diseases and a higher absenteeism rate than parent firm workers. Our study highlights the need to protect and improve the occupational health and safety of subcontractor employees. Copyright © 2013 Wiley Periodicals, Inc.

  18. 48 CFR 3003.502 - Subcontractor kickbacks.

    Science.gov (United States)

    2010-10-01

    .... 3003.502 Section 3003.502 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Other Improper Business Practices 3003.502 Subcontractor kickbacks. ...

  19. Optimizing the Time Performance of Subcontractors in Building Projects

    Directory of Open Access Journals (Sweden)

    Andy K.W Ng

    2010-07-01

    Full Text Available The main contractors of Hong Kong building projects tend to subcontract most of their work. However, many of the subcontractors complain that they are not being fully utilized due main contractors’ poor site coordination of temporary works and interfacing works and plant supports etc. A list of critical site coordination problems caused by main contractors that had adversely influence to the time performance of subcontractors was prepared. A questionnaire survey was conducted to collect data to generate multiple regression equations that explain how the critical site coordination problems affected the time performance of different types of subcontractor. The survey results were validated by neural network analysis. Backward elimination method was adopted to identify the ‘most critical’ site coordination problems that enable main contractors to formulate measures to enhance their site management system.

  20. 48 CFR 3.502-2 - Subcontractor kickbacks.

    Science.gov (United States)

    2010-10-01

    ... the consequences of detection; procurement procedures to minimize the opportunity for kickbacks; audit... gifts or gratuities received from subcontractors; annual employee declarations that they have violated...

  1. 25 CFR 1000.278 - Does this coverage extend to subcontractors of self-governance AFAs?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Does this coverage extend to subcontractors of self-governance AFAs? 1000.278 Section 1000.278 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS... subcontractors of self-governance AFAs? No, subcontractors or subgrantees providing services to a Pub. L. 93-638...

  2. 48 CFR 52.215-12 - Subcontractor Certified Cost or Pricing Data.

    Science.gov (United States)

    2010-10-01

    ... Cost or Pricing Data. 52.215-12 Section 52.215-12 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.215-12 Subcontractor Certified Cost or Pricing Data. As prescribed in 15.408(d), insert the following clause: Subcontractor Certified Cost or Pricing Data (OCT 2010) (a) Before awarding...

  3. Security guide for subcontractors

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.C.

    1991-01-01

    This security guide of the Department of Energy covers contractor and subcontractor access to DOE and Mound facilities. The topics of the security guide include responsibilities, physical barriers, personnel identification system, personnel and vehicular access controls, classified document control, protecting classified matter in use, storing classified matter repository combinations, violations, security education clearance terminations, security infractions, classified information nondisclosure agreement, personnel security clearances, visitor control, travel to communist-controlled or sensitive countries, shipment security, and surreptitious listening devices.

  4. The selection of construction sub-contractors using the fuzzy sets theory

    International Nuclear Information System (INIS)

    Krzemiński, Michał

    2015-01-01

    The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set of evaluation criteria, the part of the knowledge base and a description of the output variable

  5. 48 CFR 1516.303-76 - Fee on cost-sharing contracts by subcontractors.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Fee on cost-sharing... ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 1516.303-76 Fee on cost-sharing contracts by subcontractors. (a) Subcontractors under prime cost...

  6. 48 CFR 252.232-7005 - Reimbursement of subcontractor advance payments-DoD pilot mentor-protege program.

    Science.gov (United States)

    2010-10-01

    ... subcontractor advance payments-DoD pilot mentor-protege program. 252.232-7005 Section 252.232-7005 Federal... subcontractor advance payments—DoD pilot mentor-protege program. As prescribed in 232.412-70(c), use the following clause: Reimbursement of Subcontractor Advance Payments—DoD Pilot Mentor-Protege Program (SEP 2001...

  7. 48 CFR 3003.502-2 - Subcontractor kickbacks.

    Science.gov (United States)

    2010-10-01

    .... 3003.502-2 Section 3003.502-2 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Other Improper Business Practices 3003.502-2 Subcontractor kickbacks. (g) The DHS OIG...

  8. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  9. Current Practices to Decrease Subcontractor Bid Shopping in the Public Sector

    Science.gov (United States)

    1993-01-01

    rarely done because most contractors refuse to accept such a condition (6s15). Those public agencies adhering to the doctrine of promissory estoppel ...also encourage bid shopping. The doctrine of promissory estoppel dictates that a subcontractor must stand by his bid quote if it is used by the prime...Holman was not awarded the subcontract. (3) It is unfair to bind the subcontractor under promissory estoppel without binding the general contractor. (4

  10. Comparing two socially optimal work allocation rules when having a profit optimizing subcontractor with ample capacity

    DEFF Research Database (Denmark)

    Larsen, Christian

    We study a service system modelled as a single server queueing system where requests for service either can be processed at the service system or by a subcontractor. In the former case the subcontractor is incurred waiting costs but the service is free, while in the latter case the customer must...... pay for the service but there is no waiting time, hence no waiting costs. Under the premises that the subcontractor prices his services in order to maximize his profit, we study two work allocation rules, which given the príce of the subcontractor seek to allocate work such that the costs...

  11. The impact of globalisation on SME-subcontractors'supply chain strategies: a Danish case study

    DEFF Research Database (Denmark)

    Mathiasen, John Bang; Gammelgaard, Britta

    2007-01-01

    with higher demands on all parameters but again the price has become decisive and the traditional customer relations no longer automatically generate new orders. Subcontractors in their turn try to meet these new conditions using various strategies, moving production facilities and accepting new roles...... chain linkages between large and SMEs through growing base of international customers. The new conditions impact on SME-subcontractors owing to supply chain connections and this paper using Danish case studies explores these conditions. The results of the study show that the SME-subcontractors are met...

  12. 76 FR 77816 - Access to Confidential Business Information by Guident Technologies, Inc. and Subcontractor...

    Science.gov (United States)

    2011-12-14

    ... Business Information by Guident Technologies, Inc. and Subcontractor, Impact Innovations Systems, Inc..., Guident Technologies, Inc. of Herndon, VA and subcontractor, Impact Innovations Systems, Inc. of Manassas... Control Act (TSCA). Some of the information may be claimed or determined to be Confidential Business...

  13. 48 CFR 52.244-4 - Subcontractors and outside associates and consultants (Architect-engineer services).

    Science.gov (United States)

    2010-10-01

    ... associates and consultants (Architect-engineer services). 52.244-4 Section 52.244-4 Federal Acquisition... consultants (Architect-engineer services). As prescribed in 44.204(b), insert the following clause: Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) (AUG 1998) Any subcontractors...

  14. A game theory approach for competition and cooperation among project’s subcontractors with interaction activities

    Directory of Open Access Journals (Sweden)

    Ashkan Hafezalkotob

    2017-04-01

    Full Text Available Some projects are often performed by many subcontractors that cooperate with each other and some of them are conducted by outsourcing them to several firms; so subcontractors carry out activities in competition. Appropriate trade-off between time and cost and achieving more benefit and cost saving are objectives of both models. In this paper, it is investigated that how different subcontractors of a project can cooperate to achieve more advantages if possible and how sub-contractors can compete to make the results better and find the optimum cost to minimize the time for each of them. The competition here does not mean eliminating a competitor, but the aim is to challenge the contractors in order to choose the best decision. The purpose of this study is to address the challenges in time and cost management and to find more profit allocation among subcontractors and fair competition for fair allocation as well. A model based on cooperative game theory in time/cost trade-off problem of projects is suggested and then a competition model among subcontractors based on non-cooperative game theory is proposed. A case study is rep-resented to comprehensively illustrate the problem, the cooperative techniques of cooperative game theory, and the payoff matrix of non-cooperative model among subcontractors. Results of the proposed model reveal that subcontractors can obtain higher profit from cooperation if pos-sible. When they outsource the project and compete with each other, they must consider the in-teraction activities and choose the best strategies for cost saving and gain more reward from the client. Moreover, it is found that some techniques such as Shapley value, Core, Max-Min Core, or Equal Profit Method (EPM are able to fairly assign extra profit of cooperation, and using the payoff matrix, Nash equilibrium, and Nash bargaining helps to find the optimum point to mini-mize time and cost for interaction activities state.

  15. 75 FR 43162 - Tetrahedron, Inc., with Subcontractors: Syracuse Research Corporation; Tox Path, Inc; and...

    Science.gov (United States)

    2010-07-23

    ... obligations of the contract. DATES: Tetrahedron, Inc., and its subcontractors: Syracuse Research Corporation... contract to perform work for OPP, and access to this information will enable Tetrahedron, Inc., and its... Contract No. EP-W-10-013, Tetrahedron, Inc., and its subcontractors: Syracuse Research Corporation, Tox...

  16. Using subcontractors: the experience of IRSN and INRS

    International Nuclear Information System (INIS)

    Jeffroy, Francois; Hery, Michel

    2014-01-01

    This article discusses the current status and assessment of risks and opportunities associated with subcontracting in nuclear installations as perceived and addressed by the IRSN (Institut de Radioprotection et de Surete Nucleaire) and the INRS (Institut National de Recherche et de Securite). A first part recalls how these issues have been addressed since the 1990's. The author notices that subcontracting is associated with different terminologies for the IRSN and the INRS. In the next part, the author discusses the debate about subcontracting. He outlines that the organisation of the client must be examined, notably with respect to safety, to the way ability and traceability of subcontractor activities are considered and addressed. He comments the relationships between the client and its subcontractors. He briefly comments how the IRSN and the INRS address differently these issues related to subcontracting

  17. Security of payment regime in construction industry: are Malaysian sub-contractors ready?

    OpenAIRE

    Supardi, Azizan; Adnan, Hamimah; Mohammad, Mohammad Fadhil

    2011-01-01

    In Malaysia, the particularly small sized sub-contractors are definitely benefited from payment provisions in the proposed Construction Industry Payment and Adjudication Act (CIPA Act), but need to enhance their knowledge in order to improve their awareness of the benefits of the Act. Accordingly, this on-going research attempts to introduce proper guidelines to the sub-contractors, in giving the knowledge, to claim for payment. Firstly, the research explored the problems and legal issues rel...

  18. The Impact of Globalisation on SME-Subcontractors' Supply Chain Strategies: A Danish Case Study

    Science.gov (United States)

    Gammelgaard, Britta; Mathiasen, John Bang

    2007-01-01

    Globalisation and competition have impacted on not only large firms but also Small and Medium sizes Enterprises (SME) and these enterprises often act as subcontractors to larger firms operating in international markets. The impact of globalisation is severe on the SME-subcontractors due to supply chain linkages between large and SMEs through…

  19. Safety culture and subcontractor network governance in a complex safety critical project

    International Nuclear Information System (INIS)

    Oedewald, Pia; Gotcheva, Nadezhda

    2015-01-01

    In safety critical industries many activities are currently carried out by subcontractor networks. Nevertheless, there are few studies where the core dimensions of resilience would have been studied in safety critical network activities. This paper claims that engineering resilience into a system is largely about steering the development of culture of the system towards better ability to anticipate, monitor, respond and learn. Thus, safety culture literature has relevance in resilience engineering field. This paper analyzes practical and theoretical challenges in applying the concept of safety culture in a complex, dynamic network of subcontractors involved in the construction of a new nuclear power plant in Finland, Olkiluoto 3. The concept of safety culture is in focus since it is widely used in nuclear industry and bridges the scientific and practical interests. This paper approaches subcontractor networks as complex systems. However, the management model of the Olkiluoto 3 project is to a large degree a traditional top-down hierarchy, which creates a mismatch between the management approach and the characteristics of the system to be managed. New insights were drawn from network governance studies. - Highlights: • We studied a relevant topical subject safety culture in nuclear new build project. • We integrated safety science challenges and network governance studies. • We produced practicable insights in managing safety of subcontractor networks

  20. A Dynamic Fuzzy Approach Based on the EDAS Method for Multi-Criteria Subcontractor Evaluation

    Directory of Open Access Journals (Sweden)

    Mehdi Keshavarz-Ghorabaee

    2018-03-01

    Full Text Available Selection of appropriate subcontractors for outsourcing is very important for the success of construction projects. This can improve the overall quality of projects and promote the qualification and reputation of the main contractors. The evaluation of subcontractors can be made by some experts or decision-makers with respect to some criteria. If this process is done in different time periods, it can be defined as a dynamic multi-criteria group decision-making (MCGDM problem. In this study, we propose a new fuzzy dynamic MCGDM approach based on the EDAS (Evaluation based on Distance from Average Solution method for subcontractor evaluation. In the procedure of the proposed approach, the sets of alternatives, criteria and decision-makers can be changed at different time periods. Also, the proposed approach gives more weight to newer decision information for aggregating the overall performance of alternatives. A numerical example is used to illustrate the proposed approach and show the application of it in subcontractor evaluation. The results demonstrate that the proposed approach is efficient and useful in real-world decision-making problems.

  1. Comparing two socially optimal work allocation rules when having a profit optimizing subcontractor with ample capacity

    DEFF Research Database (Denmark)

    Larsen, Christian

    2005-01-01

    We study a service system modelled as a single server queuing system where request for service either can be processed at the service system or by a subcontractor. In the former case the customer is incurred waiting costs but the service is free, while in the latter case the customer must pay...... for the service but there is no waiting time, hence no waiting costs. Under the premises that the subcontractor prices his services in order to maximize his profit, we study two work allocation rules, which given the price of subcontractor seek to allocate work such that the costs of the customers are minimized...

  2. Comparing two socially optimal work allocation rules when having a profit optimizing subcontractor with ample capacity

    DEFF Research Database (Denmark)

    Larsen, Christian

    2003-01-01

    We study a service system modelled as a single server queueing system where request for service either can be processed at the service system or by a subcontractor. In the former case the customer is incurred waiting costs but the service is free, while in the latter case the customer must pay...... for the service but there is no waiting time, hence no waiting costs. Under the premises that the subcontractor prices his services in order to maximize his profit, we study two work allocation rules, which given the price of the subcontractor seek to allocate work such that the costs of the customers...

  3. Ohio-Based NREL Subcontractor Wins Major Small Business Award

    Science.gov (United States)

    Ohio-Based NREL Subcontractor Wins Major Small Business Award For more information contact: e:mail alternative fuel vehicles has won a major award from the U.S. Small Business Administration (SBA). Automotive Testing Laboratories, Inc. (ATL) of East Liberty, Ohio was named the SBA's Midwest Regional Small Business

  4. Incentives for subcontractors to adopt CO2 emission reporting and reduction techniques

    International Nuclear Information System (INIS)

    Scholtens, Bert; Kleinsmann, Renske

    2011-01-01

    We investigate the incentives for subcontractors (couriers) of a transport and logistics company to report about their CO 2 emissions and to implement CO 2 reducing technologies. Furthermore, we try to find out whether these incentives differ between British and Dutch couriers. We find that several incentives play a significant role. Subcontractors in the Netherlands predominantly are extrinsically motivated to engage in CO 2 reporting and reduction techniques. This is because they are mainly driven by regulatory compliance, energy costs and implementation costs. In contrast, British subcontractors are much more intrinsically motivated to comply. They are predominantly driven by energy costs, environmental awareness, relationship building and reputation building. The contractor will have to account for these differences in making its policies work. - Research highlights: → We investigate incentives for couriers to report CO 2 emissions and to implement CO 2 reduction techniques. → We compare couriers in the Netherlands and the United Kingdom. → Several incentives are significant for the adoption of CO 2 reporting and reduction measures. → There are significant differences in the sensitivity for incentives in the Netherlands and the UK.

  5. The Intercultural Marketing Competence of Software Subcontractors: Toward a Conceptual Framework

    DEFF Research Database (Denmark)

    Skaates, Maria Anne

    2002-01-01

    As part of a research project on cooperation between Nordic software development subcontractors and their foreign customers, the dynamics of intercultural marketing competence are being examined. This paper builds a conceptual bridge by developing a definition of a software subcontracting firm......'s intercultural marketing competence on the basis of (a) socio-psychological and human resource management definitions of intercultural competence at the level of individuals and (b) definitions of organizational competence from the resource-based perspective. Furthermore a model of the dynamics...... of this competence is presented. In connection with the model, key economic aspects of the competence from the viewpoints of both the subcontractor and its customer firm - including strategic importance, heterogeneity, imperfect mobility, ex ante limits to competition, dynamic transaction costs, time compression...

  6. A Comparative Research on the Satisfaction of the Main Contractor and Subcontractor Workers: The Case of Yalova Municipality

    Directory of Open Access Journals (Sweden)

    Orhan Koçak

    2011-09-01

    Full Text Available The subcontractor practices on both in public and private sectors have been increasing because of Neo-liberal policies that have been spreading together with globalization. Subcontractors have been obtaining competitive advantages and cost reductions by employing non-unionized workers. With these practices, some discriminations and differences are seen related to workers in the organization, also some social and physiological problems are observed between workers. Thus, the expectations of the workers are differentiated and the level of motivations and job satisfactions of the workers are changed. Because, the workers, who work under subcontractors and have no membership of a trade union, are subjected to some negatives such as the lack of income and job security. Especially, with the spreading of the subcontractor applications in municipalities, municipality workers are divided into some groups such as those who are members of trade unions and those who are not, and those who work for the main contractor and subcontractor. Also, the rights of workers are differentiated in terms of social and economics. In this context, the workers’ satisfaction level of Yalova Municipality in terms of the discriminations and differentiations is going to be studied.

  7. Subcontractor procurement in construction: the interplay of price and trust

    NARCIS (Netherlands)

    Hartmann, Andreas; Caerteling, Jasper

    2010-01-01

    Purpose: The purpose of this paper is to examine the relative importance of price and trust and their interaction in subcontractor selection. By doing so, it aims to respond to the currently dominant view that trust-based procurement is the remedy to performance problems in construction. The paper

  8. 78 FR 70477 - Federal Acquisition Regulation; Accelerated Payments to Small Business Subcontractors

    Science.gov (United States)

    2013-11-25

    ..., public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance... Payments to Small Business Subcontractors, as prescribed in 32.009-2. * * * * * PART 32--CONTRACT FINANCING...

  9. Security guide for subcontractors

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.C.

    1993-06-01

    This guide is provided to aid in the achievement of security objectives in the Department of Energy (DOE) contractor/subcontractor program. The objectives of security are to protect information that, if released, would endanger the common defense and security of the nation and to safeguard plants and installations of the DOE and its contractors to prevent the interruption of research and production programs. The security objective and means of achieving the objective are described. Specific security measures discussed in this guide include physical barriers, personnel identification systems, personnel and vehicular access control, classified document control, protection of classified matter in use, storing classified matter, and repository combinations. Means of dealing with security violations and security infractions are described. Maintenance of a security education program is discussed. Also discussed are methods of handling clearance terminations, visitor control, travel to sensitive countries, and shipment security. The Technical Surveillance Countermeasures Program (TSCM), the Computer Security Program, and the Operations Security Plan (OPSEC) are examined.

  10. Suspect/Counterfeit Items Information Guide for Subcontractors/Suppliers

    Energy Technology Data Exchange (ETDEWEB)

    Tessmar, Nancy D. [Los Alamos National Laboratory; Salazar, Michael J. [Los Alamos National Laboratory

    2012-09-18

    Counterfeiting of industrial and commercial grade items is an international problem that places worker safety, program objectives, expensive equipment, and security at risk. In order to prevent the introduction of Suspect/Counterfeit Items (S/CI), this information sheet is being made available as a guide to assist in the implementation of S/CI awareness and controls, in conjunction with subcontractor's/supplier's quality assurance programs. When it comes to counterfeit goods, including industrial materials, items, and equipment, no market is immune. Some manufactures have been known to misrepresent their products and intentionally use inferior materials and processes to manufacture substandard items, whose properties can significantly cart from established standards and specifications. These substandard items termed by the Department of Energy (DOE) as S/CI, pose immediate and potential threats to the safety of DOE and contractor workers, the public, and the environment. Failure of certain systems and processes caused by an S/CI could also have national security implications at Los Alamos National Laboratory (LANL). Nuclear Safety Rules (federal Laws), DOE Orders, and other regulations set forth requirements for DOE contractors to implement effective controls to assure that items and services meet specified requirements. This includes techniques to implement and thereby minimizing the potential threat of entry of S/CI to LANL. As a qualified supplier of goods or services to the LANL, your company will be required to establish and maintain effective controls to prevent the introduction of S/CI to LANL. This will require that your company warrant that all items (including their subassemblies, components, and parts) sold to LANL are genuine (i.e. not counterfeit), new, and unused, and conform to the requirements of the LANL purchase orders/contracts unless otherwise approved in writing to the Los Alamos National Security (LANS) contract administrator

  11. 77 FR 75089 - Federal Acquisition Regulation; Accelerated Payments to Small Business Subcontractors

    Science.gov (United States)

    2012-12-19

    ... link ``Submit a Comment'' that corresponds with FAR Case 2012-031. Follow the instructions provided at... proper documentation from small business subcontractors. The clause will be inserted into all new... of commercial items. * * * * * (d) * * * (4) Insert the clause at 52.232-XX, Providing Accelerated...

  12. 75 FR 43116 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors...

    Science.gov (United States)

    2010-07-23

    ..., impact recruitment and retention of individuals with disabilities? 10. Has training of employees and/or... practices; (2) Provide reasonable accommodations to qualified job applicants and employees with disabilities... records; and (5) For those contractors and subcontractors with 50 or more employees and a contract of $50...

  13. Mass Customization as Innovation Driver of International Competitiveness in Peripheral Regional SME Subcontractors

    DEFF Research Database (Denmark)

    Taps, Stig B.; Brunø, Thomas Ditlev; Nielsen, Kjeld

    2014-01-01

    practices that can be exploited as competitive capabilities. This paper suggests that an open network structure demands a transformation of peripheral-located SME subcontractor from traditional customized producer to mass customized producer. Mass customization as an instrument for the transformation...

  14. 77 FR 7108 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Science.gov (United States)

    2012-02-10

    ... DEPARTMENT OF LABOR Office of Federal Contract Compliance Programs 41 CFR Part 60-741 RIN 1250-AA02 Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding Individuals With Disabilities AGENCY: Office of Federal Contract Compliance Programs, Labor. ACTION: Notice of...

  15. 76 FR 36482 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding...

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF LABOR Office of Federal Contract Compliance Programs 41 CFR Parts 60-250 and 60-300 RIN 1250-AA00 Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding Protected Veterans AGENCY: Office of Federal Contract Compliance Programs, Labor. ACTION: Notice...

  16. The impact of globalisation on SME-subcontractors'supply chain strategies: a Danish case study

    DEFF Research Database (Denmark)

    Mathiasen, John Bang; Gammelgaard, Britta

    2007-01-01

    with higher demands on all parameters but again the price has become decisive and the traditional customer relations no longer automatically generate new orders. Subcontractors in their turn try to meet these new conditions using various strategies, moving production facilities and accepting new roles...

  17. The Internationalization of Software Development Subcontractors: A Nordic Perspective on What We Know and What We Need to Know

    DEFF Research Database (Denmark)

    Skaates, Maria Anne

    2003-01-01

    As part of a research project, which will encompass in-depth case studies of small Nordic software development subcontractors' work for large, foreign software corporations, the dynamics of the initial phases of the subcontractors' internationalization will be examined. Because high-tech firms from...... framework for the study. It starts with a look at the Nordic perspective on this issue as well as a brief review of existing literature on service firms', software firms' and SMEs' internationalization, before going on to elucidate and justify the study's eleven research questions. Thereafter relevant...

  18. 78 FR 42804 - Whirlpool Corporation, Including On-Site Leased Workers From Aerotek/Tek Systems (Subcontractor...

    Science.gov (United States)

    2013-07-17

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-82,346] Whirlpool Corporation, Including On-Site Leased Workers From Aerotek/Tek Systems (Subcontractor of IBM Corporation) and Jones Lang... firm. The workers were engaged in production of refrigerators and trash compactors as well as...

  19. Facing the Global Economic Crisis: the Case of Swedish Heavy Vehicle Subcontractors

    OpenAIRE

    Helmersson, Andreas; Radway, Robert

    2010-01-01

    In this paper, we investigate organisational responses to an economic crisis within a group of seven subcontractors in the Swedish heavy vehicle industry. Although the participating firms had similar exposures to an abrupt and severe shift in demand, their performances during the crisis varied extensively. One year after the crisis began, some firms were still encountering financial problems threatening their survival, yet others had orchestrated a recovery that was generating healthy cash fl...

  20. Report style guide for subcontractors of the Efficiency and Renewables Research Section, Energy Division, Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Stone, T.A.; Bennett, M.N.

    1992-09-01

    This document has been paraphrased from the ORNL Document Preparation Guide (DPG). It is intended for use by Efficiency and Renewables Research Section, Energy Division, ORNL subcontractor reports so that review and editing effort can be minimized. Topics covered are typing instructions, document format, usage, abbreviations and acronyms, and standard editing marks.

  1. Life, work, health of employees of subcontractors of the nuclear industry

    International Nuclear Information System (INIS)

    Barbat, D.; Bejeau, D.; Bergaut, F.; Boulay, M.H.; Devaux, M.J.; Diem-Lam, L.; Hemery, J.M.; Meyer, A.; Rousselet, A.; Sauvagere, J.; Sud, R.; Thomas, B.; Zimmermann, A.M.; Loussert, B.; Vibert, M.L.; Wilbert, B.; Monteleon, P.Y.; Wargon, C.

    2013-12-01

    The authors present and comment the results of a survey on the constraints of working and living conditions specific to subcontractor activities in the nuclear industry, on the health status of the concerned employees, and on the associated potential difficulties to remain at work, and on professional perspectives for these employees. The authors present the method, the questionnaire content, the studied population, and the statistical treatment. Results are discussed in terms of general data, of peculiarities of work in the nuclear sector, of general work organization, of risk related to road traffic, of living conditions during a mission, of perceived health, of motives to look for another kind of job, of occupational health data. The authors report the results of a multivariate analysis on various aspects, and then propose a large discussion of survey results

  2. QA manpower requirement for nuclear power plants

    International Nuclear Information System (INIS)

    Link, M.

    1980-01-01

    To ensure the quality of the plant, QA activities are to be performed by the owner, the main contractor, the subcontractors and the Licensing Authority. The responsibilities of the QA-personnel of these organizations comprise as a minimum the control of the quality assurance systems and the proof of the quality requirements. Numbers of the required QA-personnel, designated for different tasks and recommended educational levels and professional qualifications will be given. (orig./RW)

  3. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    Science.gov (United States)

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  4. Legal Nature of the Investor’s Consent to the Conclusion of the Agreement with Sub-contractor

    OpenAIRE

    Sławomir Szejna

    2013-01-01

    Author of present article presents and comments on the divergent views of doctrine and judicature concerning the legal nature of the investor’s consent to the conclusion of the agreement for subcontracting, arose from the introduction of the provisions of Article 6471 § 2 and 3 to the Polish Civil Code with Act dated 14 February 2003 amending the Act – the Civil Code and other acts. Author refers also to the joint responsibility of the investor and the contractor towards further subcontractor...

  5. 42 CFR 421.110 - Requirements for approval of an agreement.

    Science.gov (United States)

    2010-10-01

    ... SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE CONTRACTING Intermediaries § 421.110 Requirements for... regulatory authorities of the State or States in which it, or any subcontractor performing some or all of its... only providers located in a single State; (5) Has acted in good faith to achieve effective cooperation...

  6. TCLP Preparation and Analysis of K East Basin Composite Sludge Samples

    International Nuclear Information System (INIS)

    Silvers, K.L.; Wagner, J.J.; Steele, R.T.

    2000-01-01

    Sludge samples from the Hanford K East Basin were analyzed by the Toxicity Characterization Leaching Procedure (TCLP) to assist in the appropriate Resource Conservation and Recovery Act (RCIL4) designation of this material. Sludge samples were collected by Fluor Hanford, Inc. using the consolidated sludge sampling system (system that allows collection of a single sample from multiple sample locations). These samples were shipped to the Postirradiation Testing Laboratory (PTL, 327 Building) and then transferred to the Pacific Northwest National Laboratory (PNNL) Radiochemical Processing Laboratory (RPL, 325 Building) for recovery and testing. Two sludge composites were prepared, using the consolidated sludge samples, to represent K East canister sludge (sample KC Can Comp) and K East floor sludge (sample KC Floor Comp). Each composite was extracted in duplicate and analyzed in duplicate following pre-approved(a) TCLP extraction and analyses procedures. In addition, these samples and duplicates were analyzed for total RCRA metals (via acid digestion preparation). The work was conducted in accordance with the requirements of the Hanford Analytical Quality Assurance Requirements Document (HASQARD). A PNNL Quality Assurance Program compliant with J HASQARD was implemented for this effort. The results from the TCLP analyses showed that all RCRA metal concentrations were less than the TCLP limits for both the canister and floor composite samples and their respective duplicates

  7. Using Electromagnetic Algorithm for Total Costs of Sub-contractor Optimization in the Cellular Manufacturing Problem

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Shahriari

    2016-12-01

    Full Text Available In this paper, we present a non-linear binary programing for optimizing a specific cost in cellular manufacturing system in a controlled production condition. The system parameters are determined by the continuous distribution functions. The aim of the presented model is to optimize the total cost of imposed sub-contractors to the manufacturing system by determining how to allocate the machines and parts to each seller. In this system, DM could control the occupation level of each machine in the system. For solving the presented model, we used the electromagnetic meta-heuristic algorithm and Taguchi method for determining the optimal algorithm parameters.

  8. Development of subcontractor indirect cost and other direct cost at the DOE Fernald Site

    International Nuclear Information System (INIS)

    Cossman, R.L.

    1994-01-01

    The Fernald Environmental Restoration Management Corporation (FERMCO) took great strides in the development of cost estimates at Fernald. There have been many opportunities to improve on how the policies and procedures pertaining to cost estimates were to be implemented. As FERMCO took over the existing Fernald facility, the Project Controls Division began to format the estimating procedures and tools to do business at Fernald. The Estimating Department looked at the problems that pre-existed at the site. One of the key problems that FERMCO encountered was how to summarized the direct and indirect accounts of each subcontracted estimate. Direct costs were broken down by prime and sub-prime accounts. This presented a level of detail that had not been experienced at the site before; it also created many issues concerning accounts and definitions to be applied to ''all other accounts associated with a project.'' Existing subcontract indirect cost accounts were reviewed from existing historical estimates. It was found that some were very detailed and some were not. The Estimating Department was given the task of standardizing the accounts and percentages for each of the subcontractor indirect costs. Then, as the project progressed, the percentages could be revised with actual estimates, subcontract comparisons, or with level of effort (LOE) accounts, which would represent qualified people assigned a task for the completion of each project. The approach is to assign particular employees to perform a specific task within a project from start to finish, and then to reassign the individual(s) to a new project (if it was available) integrating the expertise available with the skills required by the other operable units

  9. Management of Interface between Main Contractor and Subcontractors for Successful Project Outcomes

    Directory of Open Access Journals (Sweden)

    Harry White

    2014-01-01

    Full Text Available There has been increased dependence on subcontracting within the construction industry, the operational relationship between the Main Contractor (MC and Subcontractor (SC plays a significant role in successful delivery of projects. Through the literature review this paper argues that despite SCs bring added value to construction projects, the increased reliance on SCs has strained relationships between the MC and SC. Also MCs are more concerned with risk and price reduction which undermine the relationship heavily. Current practices in the construction industry in managing SCs were evaluated through a case study and semi-structured interviews. A questionnaire survey was used to investigate the ways of facilitating the interface between the MC and SC in general. The study highlighted that prevailing adverse relationships and culture in the industry are influencing the success of construction projects. The lack of trust is a key factor affecting the relationships between MC and SCs. However, the proactive involvement of the MC with SCs in maintaining continuity of the team from procurement to construction stage and transparency in the processes were key success factors for successful completion of the project.

  10. Safety Culture: A Requirement for New Business Models — Lessons Learned from Other High Risk Industries

    International Nuclear Information System (INIS)

    Kecklund, L.

    2016-01-01

    Technical development and changes on global markets affects all high risk industries creating opportunities as well as risks related to the achievement of safety and business goals. Changes in legal and regulatory frameworks as well as in market demands create a need for major changes. Several high risk industries are facing a situation where they have to develop new business models. Within the transportation domain, e.g., aviation and railways, there is a growing concern related to how the new business models may affects safety issues. New business models in aviation and railways include extensive use of outsourcing and subcontractors to reduce costs resulting in, e.g., negative changes in working conditions, work hours, employment conditions and high turnover rates. The energy sector also faces pressures to create new business models for transition to renewable energy production to comply with new legal and regulatory requirements and to make best use of new reactor designs. In addition, large scale phase out and decommissioning of nuclear facilities have to be managed by the nuclear industry. Some negative effects of new business models have already arisen within the transportation domain, e.g., the negative effects of extensive outsourcing and subcontractor use. In the railway domain the infrastructure manager is required by European and national regulations to assure that all subcontractors are working according to the requirements in the infrastructure managers SMS (Safety Management System). More than ten levels of subcontracts can be working in a major infrastructure project making the system highly complex and thus difficult to control. In the aviation domain, tightly coupled interacting computer networks supplying airport services, as well as air traffic control, are managed and maintained by several different companies creating numerous interfaces which must be managed by the SMS. There are examples where a business model with several low

  11. Report for Batch Leach Analyses on Sediments at 100-KR-4 Operable Unit, Boreholes C7684, C7688, and C7695

    Energy Technology Data Exchange (ETDEWEB)

    Lindberg, Michael J.

    2011-03-01

    This is a data report for sediment samples received by CHPRC from the 100-KR-4 OU. Between December 17, 2010 and February 17, 2011 sediment samples were received from 100-KR-4 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

  12. 76 FR 6468 - Versar, Tetrahedron, Inc. and Info Impact; Transfer of Data

    Science.gov (United States)

    2011-02-04

    ..., to fulfill the obligations of the contract. DATES: Versar and its subcontractors, Tetrahedron, Inc... subcontractors, Tetrahedron, Inc. and Info Impact, have been awarded a contract to perform work for OPP, and.... II. Contractor Requirements Under Contract No. EP-W-11-007, Versar and its subcontractors...

  13. Hazardous Waste Remedial Actions Program requirements for quality control of analytical data

    International Nuclear Information System (INIS)

    Miller, M.S.; Zolyniak, J.W.

    1988-08-01

    The Hazardous Waste Remedial Action Program (HAZWRAP) is involved in performing field investigations and sample analysis pursuant to the NCP for the Department of Energy and other federal agencies. The purpose of this document is to specify the requirements for the control of the accuracy, precision and completeness of the samples, and data from the point of collection through analysis. The requirements include data reduction and reporting of the resulting environmentally related data. Because every instance and concern may not be addressed in this document, HAZWRAP subcontractors are encouraged to discuss any questions with the HAZWRAP Project Manager hereafter identified as the Project Manager

  14. 75 FR 22407 - Versar, Inc. and Syracuse Research Corporation; Transfer of Data

    Science.gov (United States)

    2010-04-28

    ... fulfill the obligations of the contract. DATES: Versar, Inc. and its subcontractor, Syracuse Research... subcontractor, Syracuse Research Corporation, have been awarded a contract to perform work for OPP, and access... Requirements Under Contract No. EP-W-10-004, Versar, Inc. and its subcontractor, Syracuse Research Corporation...

  15. Structural Design Requirements and Factors of Safety for Spaceflight Hardware: For Human Spaceflight. Revision A

    Science.gov (United States)

    Bernstein, Karen S.; Kujala, Rod; Fogt, Vince; Romine, Paul

    2011-01-01

    This document establishes the structural requirements for human-rated spaceflight hardware including launch vehicles, spacecraft and payloads. These requirements are applicable to Government Furnished Equipment activities as well as all related contractor, subcontractor and commercial efforts. These requirements are not imposed on systems other than human-rated spacecraft, such as ground test articles, but may be tailored for use in specific cases where it is prudent to do so such as for personnel safety or when assets are at risk. The requirements in this document are focused on design rather than verification. Implementation of the requirements is expected to be described in a Structural Verification Plan (SVP), which should describe the verification of each structural item for the applicable requirements. The SVP may also document unique verifications that meet or exceed these requirements with NASA Technical Authority approval.

  16. Construction safety program for the National Ignition Facility Appendix A: Safety Requirements

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    These rules apply to all LLNL employees, non-LLNL employees (including contract labor, supplemental labor, vendors, personnel matrixed/assigned from other National Laboratories, participating guests, visitors and students) and construction contractors/subcontractors. The General Safety and Health rules shall be used by management to promote accident prevention through indoctrination, safety and health training and on-the-job application. As a condition for contracts award, all contractors and subcontractors and their employees must certify on Form S ampersand H A-1 that they have read and understand, or have been briefed and understand, the National Ignition Facility OCIP Project General Safety Rules

  17. Construction safety program for the National Ignition Facility Appendix A: Safety Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-01-14

    These rules apply to all LLNL employees, non-LLNL employees (including contract labor, supplemental labor, vendors, personnel matrixed/assigned from other National Laboratories, participating guests, visitors and students) and construction contractors/subcontractors. The General Safety and Health rules shall be used by management to promote accident prevention through indoctrination, safety and health training and on-the-job application. As a condition for contracts award, all contractors and subcontractors and their employees must certify on Form S & H A-1 that they have read and understand, or have been briefed and understand, the National Ignition Facility OCIP Project General Safety Rules.

  18. Section 4: Requirements Intertwining

    Science.gov (United States)

    Loucopoulos, Pericles

    Business analysts are being asked to develop increasingly complex and varied business systems that need to cater to the changing and dynamic market conditions of the new economy. This is particularly acute in today’s turbulent business environment where powerful forces such as deregulation, globalisation, mergers, advances in information and telecommunications technologies, and increasing education of people provide opportunities for organising work in ways that have never before been possible. Enterprises attempt to create wealth either by getting better at improving their products and services or by harnessing creativity and human-centred management to create innovative solutions. In these business settings, requirements become critical in bridging system solutions to organisational and societal problems. They intertwine organisational, social, cognitive, and implementation considerations and they can provide unique insights to change in systems and their business context. Such design situations often involve multiple stakeholders from different participating organisations, subcontractors, divisions, etc., who may have a diversity of expertise, come from different organisational cultures and often have competing goals. The success or failure of many projects depends, to a large extent, on understanding the contextual setting of requirements and their interaction amongst a diverse population of stakeholders.

  19. Industrial gamma radiography on a building site with a portable device. Recommendations to operators - gammagraphy sheet ED 4243; Recommendations to intervening companies (subcontractors) -gammagraphy sheet ED 4244; Recommendations to user companies - gammagraphy sheet ED 4245

    International Nuclear Information System (INIS)

    Vaisseau, Bernard; Bourdon, Patrick; Laurent, Pierre; Servent, Jean-Pierre; Biau, Alain

    2006-12-01

    Based on best practices, three sheets indicate sets of recommendations regarding the use of an industrial gamma radiography portable device on a building site either by operators, intervening companies (or subcontractors), or user companies. As far as operators are concerned, recommendations concern preparation and transport, arrival on the building site, examination performance, end of examination, occurrence of an incident other than radiological, and occurrence of a radiological incident. As far as subcontractors are concerned, recommendations concern the actors of the intervening company, the permanent storage site of portable devices, the film development laboratory, portable devices and their accessories, other equipment used for examination, vehicles, operators, intervention preparation, the return on experience, and the immediate processing of anomalies. As far as user companies are concerned, recommendations concern actors of the user company, the definition of the operation, the previous inspection of premises and the definition of a prevention plan, the storage of equipment containing depleted uranium, loading and unloading operations, the coordination of exposure doses, the immediate processing of anomalies, and the return on experience. Moreover, the three sheets indicate the associated legal texts

  20. Integration plan required by performance agreement SM 7.2.1

    International Nuclear Information System (INIS)

    Diediker, L.P.

    1997-01-01

    Fluor Daniel Hanford, Inc. and its major subcontractors are in agreement that environmental monitoring performed under the Project Hanford Management Contract is to be done in accordance with a single, integrated program. The purpose of this Integration Plan for Environmental Monitoring is to document the policies, systems, and processes being put in place to meet one key objective: manage and integrate a technically competent, multi-media ambient environmental monitoring program, in an efficient, cost effective manner. Fluor Daniel Hanford, Inc. and its major subcontractors also commit to conducting business in a manner consistent with the International Standards Organization 14000 Environmental Management System concepts. Because the integration of sitewide groundwater monitoring activities is managed by the Environmental Restoration Contractor, groundwater monitoring it is outside the scope of this document. Therefore, for the purpose of this Integration Plan for Environmental Monitoring, the Integrated Environmental Monitoring Program is defined as applicable to all environmental media except groundwater. This document provides recommendations on future activities to better integrate the overall environmental monitoring program, with emphasis on the near-field program. In addition, included is the Fluor Daniel Hanford, Inc. team review of the environmental monitoring activities on the Hanford Site, with concurrence of Pacific Northwest National Laboratory and Bechtel Hanford, Inc. (The narrative provided later in the Discussion Section describes the review and consideration given to each topic.) This document was developed to meet the requirements of the Project Hanford Management Contract performance agreement (SM7.2) and the tenets of the U.S. Department of Energy's Effluent and Environmental Monitoring Planning Process. This Plan is prepared for the U.S. Department of Energy, Richland Operations Office, Environmental Assurance, Permits, and Policy Division

  1. The Impossible Confinement of Nuclear Work. The Professional and Family Experience of Subcontractors Exposed to Radioactivity in France Nuclear Power Industry

    International Nuclear Information System (INIS)

    Ghis Malfilatre, Marie

    2016-01-01

    Drawing on an ethnographical approach paying close attention to biographical careers, this article focuses on the relationship subcontractors and their partners have with a professional activity defined by considerable geographical mobility and structural exposition to radioactivity. This work, seized as an opportunity by young men and couples, demands a challenging organization of the life 'on the side' which is tolerated for a while, but which is also unable to put an end to male professional fatigue and can even turn out to deteriorate family life. While workers and their partners are busy holding together to face the constraints of long time separation, the risks of work, long ignored, eventually bring trouble and anxiety into family life. This situation affects relatives whose support appears to be decisive, in the mobilization dynamics for the defense of health as well as in the industrial disease experience

  2. Training requirements and responsibilities for the Buried Waste Integrated Demonstration at the Radioactive Waste Management Complex

    International Nuclear Information System (INIS)

    Vega, H.G.; French, S.B.; Rick, D.L.

    1992-09-01

    The Buried Waste Integrated Demonstration (BWID) is scheduled to conduct intrusive (hydropunch screening tests, bore hole installation, soil sampling, etc.) and nonintrusive (geophysical surveys) studies at the Radioactive Waste Management Complex (RWMC). These studies and activities will be limited to specific locations at the RWMC. The duration of these activities will vary, but most tasks are not expected to exceed 90 days. The BWID personnel requested that the Waste Management Operational Support Group establish the training requirements and training responsibilities for BWID personnel and BWID subcontractor personnel. This document specifies these training requirements and responsibilities. While the responsibilities of BWID and the RWMC are, in general, defined in the interface agreement, the training elements are based on regulatory requirements, DOE orders, DOE-ID guidance, state law, and the nature of the work to be performed

  3. Respirators: Air Purifying, Self-Study, Course 40723

    Energy Technology Data Exchange (ETDEWEB)

    Chochoms, Michael [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-12-21

    Respirators: Air Purifying Self-Study (COURSE 40723) is designed for Los Alamos National Laboratory (LANL) workers, support services subcontractors, and other LANL subcontractors who work under the LANL Respiratory Protection Program (RPP). This course also meets the air-purifying respirators (APRs) retraining requirement.

  4. 78 FR 19467 - Information Collection Requirement; Defense Federal Acquisition Regulation Supplement (DFARS...

    Science.gov (United States)

    2013-04-01

    ... subcontractors and suppliers; and (3) foster the establishment of long-term business relationships between... technology. The Office of Management and Budget (OMB) has approved this information collection for use...

  5. 29 CFR 1926.16 - Rules of construction.

    Science.gov (United States)

    2010-07-01

    ... relieving the subcontractors from the actual, but not any legal, responsibility (or, as the case may be, relieving the other subcontractors from this responsibility). In no case shall the prime contractor be relieved of overall responsibility for compliance with the requirements of this part for all work to be...

  6. Construction Tender Subcontract Selection using Case-based Reasoning

    Directory of Open Access Journals (Sweden)

    Due Luu

    2012-11-01

    Full Text Available Obtaining competitive quotations from suitably qualified subcontractors at tender tim n significantly increase the chance of w1nmng a construction project. Amidst an increasingly growing trend to subcontracting in Australia, selecting appropriate subcontractors for a construction project can be a daunting task requiring the analysis of complex and dynamic criteria such as past performance, suitable experience, track record of competitive pricing, financial stability and so on. Subcontractor selection is plagued with uncertainty and vagueness and these conditions are difficul_t o represent in generalised sets of rules. DeciSIOns pertaining to the selection of subcontr:act?s tender time are usually based on the mtu1t1onand past experience of construction estimators. Case-based reasoning (CBR may be an appropriate method of addressing the chal_lenges of selecting subcontractors because CBR 1s able to harness the experiential knowledge of practitioners. This paper reviews the practicality and suitability of a CBR approach for subcontractor tender selection through the development of a prototype CBR procurement advisory system. In this system, subcontractor selection cases are represented by a set of attributes elicited from experienced construction estimators. The results indicate that CBR can enhance the appropriateness of the selection of subcontractors for construction projects.

  7. Enforcement handbook: Enforcement of DOE nuclear safety requirements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This Handbook provides detailed guidance and procedures to implement the General Statement of DOE Enforcement Policy (Enforcement Policy or Policy). A copy of this Enforcement Policy is included for ready reference in Appendix D. The guidance provided in this Handbook is qualified, however, by the admonishment to exercise discretion in determining the proper disposition of each potential enforcement action. As discussed in subsequent chapters, the Enforcement and Investigation Staff will apply a number of factors in assessing each potential enforcement situation. Enforcement sanctions are imposed in accordance with the Enforcement Policy for the purpose of promoting public and worker health and safety in the performance of activities at DOE facilities by DOE contractors (and their subcontractors and suppliers) who are indemnified under the Price-Anderson Amendments Act. These indemnified contractors, and their suppliers and subcontractors, will be referred to in this Handbook collectively as DOE contractors. It should be remembered that the purpose of the Department`s enforcement policy is to improve nuclear safety for the workers and the public, and this goal should be the prime consideration in exercising enforcement discretion.

  8. Enforcement handbook: Enforcement of DOE nuclear safety requirements

    International Nuclear Information System (INIS)

    1995-06-01

    This Handbook provides detailed guidance and procedures to implement the General Statement of DOE Enforcement Policy (Enforcement Policy or Policy). A copy of this Enforcement Policy is included for ready reference in Appendix D. The guidance provided in this Handbook is qualified, however, by the admonishment to exercise discretion in determining the proper disposition of each potential enforcement action. As discussed in subsequent chapters, the Enforcement and Investigation Staff will apply a number of factors in assessing each potential enforcement situation. Enforcement sanctions are imposed in accordance with the Enforcement Policy for the purpose of promoting public and worker health and safety in the performance of activities at DOE facilities by DOE contractors (and their subcontractors and suppliers) who are indemnified under the Price-Anderson Amendments Act. These indemnified contractors, and their suppliers and subcontractors, will be referred to in this Handbook collectively as DOE contractors. It should be remembered that the purpose of the Department's enforcement policy is to improve nuclear safety for the workers and the public, and this goal should be the prime consideration in exercising enforcement discretion

  9. Requirements for quality control of analytical data

    International Nuclear Information System (INIS)

    Westmoreland, R.D.; Bartling, M.H.

    1990-07-01

    The National Contingency Plan (NCP) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) provides procedures for the identification, evaluation, and remediation of past hazardous waste disposal sites. The Hazardous Materials Response section of the NCP consists of several phases: Preliminary Assessment, Site Inspection, Remedial Investigation, Feasibility Study, Remedial Design, and Remedial Action. During any of these phases, analysis of soil, water, and waste samples may be performed. The Hazardous Waste Remedial Actions Program (HAZWRAP) is involved in performing field investigations and sample analyses pursuant to the NCP for the US Department of Energy and other federal agencies. The purpose of this document is to specify the requirements of Martin Marietta Energy Systems, Inc., for the control of accuracy, precision, and completeness of samples and data from the point of collection through analysis. Requirements include data reduction and reporting of resulting environmentally related data. Because every instance and concern may not be addressed in this document, HAZWRAP subcontractors are encouraged to discuss any questions with the Analytical Quality Control Specialist (AQCS) and the HAZWRAP Project Manager. This revision supercedes all other versions of this document

  10. مسؤولية المقاول والمقاول الفرعي

    Directory of Open Access Journals (Sweden)

    خوله كاظم محمد المعموري

    2017-03-01

    Full Text Available The principal obligation which is caused by contract and actually the responsibility of the contractor contract is to get the job done, who has vowed to do, Valmquaol binding to complete the work in accordance with the conditions and specifications agreed upon, as well as in accordance with the conditions Tstjobha workmanship origins and traditions, have the contractor subcontract for the purpose of completing the work with promised subcontractors if the nature of the work contract subject permit and if the subject of the work requires the implementation of the use of a contractor last and work is done by the contractor despite the use of the completion of the work to another contractor, each of these is a contractor in the work of the borders, and be committed Special security in this border is not enough to say the existence of a sub-contractor to conclude a contract Contractor original contractor fled Aa him but must sub-contract and that the contract is linked to the original so that the sub-contractor involved in the implementation of the original contract in whole or in part. The contract original and subsequent contract Resume shop assume, unity, and that the sub-contractor or sub should be doing on-site intervenes whereby in the implementation of the original contract, which embodies the unity of action as the subcontracting is only a branch of the original contract, as to the extent of ensuring sub-contractor for construction defects, the commitment of the contractor ends subcontractors security once he receives the Contractor original work enables him to study it and figuring out what its defects if hidden defects emerged then be sub-contractor liable only during the period that requires the contract or custom .ually it does not be a sub-contractor directly responsible to the employer, but remains responsible towards the original contractor.

  11. 48 CFR 52.222-27 - Affirmative Action Compliance Requirements for Construction.

    Science.gov (United States)

    2010-10-01

    ... performance by other Contractors or subcontractors toward a goal in an approved plan does not excuse any... which the Contractor has a collective bargaining agreement, to refer minorities or women shall excuse... the following: (1) Ensure a working environment free of harassment, intimidation, and coercion at all...

  12. 48 CFR 1352.271-72 - Additional Item Requirements (AIR)-growth work

    Science.gov (United States)

    2010-10-01

    ... direct material purchases and subcontractor handling. The estimated quantity of labor hours and handling... performance period. All growth work shall be paid at the prices stated in the Schedule. (b) The contractor... Government's intention to award any growth work identified during the repair to the contractor, if a fair and...

  13. 48 CFR 1852.204-76 - Security requirements for unclassified information technolocgy resources.

    Science.gov (United States)

    2010-10-01

    ... subcontractors must obtain physical or electronic (i.e., authentication level 2 and above as defined in National Institute of Standards and Technology (NIST) Special Publication (SP) 800-63, Electronic Authentication... shall be updated on a yearly basis. (iii) The FIPS 199 assessment shall identify all information types...

  14. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  15. The expert inspecting plants which require supervision - is he invested with special rights

    International Nuclear Information System (INIS)

    Weber, H.P.; Seitz, F.

    1980-01-01

    The authors investigate as to whether the TUeV (technical control authorities) or individual experts are sub-contractors as defined by Sect. 24 (3) of the Industrial Code as they control plants requiring supervision. If they were, consequences for liability and the right opposing party in court would result from this fact. The question has to be settled as to whether the expert was given competencies under Public Law, be it coercive power, the authority to issue acts of administration or the authority to exercise other competencies under Public Law outside the law of public regulating authority. The authors come to the conclusion that the TUeV experts' activities amount to pure statements of facts, having a supportive effect for the supervisory authorities. The term sub-contracting is out of the question; moreover, there is no legal basis for it. (HSCH) [de

  16. 78 FR 42391 - Small Business Subcontracting

    Science.gov (United States)

    2013-07-16

    ... that are not required municipal services such as those required under local franchise agreements. SBA... (c)(3)(iii) are unduly broad, suggesting that it is the subcontractor's perception of future work...

  17. 10 CFR 850 Implementation of Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S

    2012-01-05

    10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Worker Safety and Health Program and, thus, implementation documents and responsibilities are integrated in various documents and organizational structures. Program development and management of the CBDPP is delegated to the Environment, Safety and Health (ES&H) Directorate, Worker Safety and Health Functional Area. As per 10 CFR 850, Lawrence Livermore National Security, LLC (LLNS) periodically submits a CBDPP to the National Nuclear Security Administration/Livermore Site Office (NNSA/LSO). The requirements of this plan are communicated to LLNS workers through ES&H Manual Document 14.4, 'Working Safely with Beryllium.' 10 CFR 850 is implemented by the LLNL CBDPP, which integrates the safety and health standards required by the regulation, components of the LLNL Integrated Safety Management System (ISMS), and incorporates other components of the LLNL ES&H Program. As described in the regulation, and to fully comply with the regulation, specific portions of existing programs and additional requirements are identified in the CBDPP. The CBDPP is implemented by documents that interface with the workers, principally through ES&H Manual Document 14.4. This document contains information on how the management practices prescribed by the LLNL ISMS are implemented, how beryllium hazards that are associated with LLNL work activities are controlled, and who is responsible for implementing the controls. Adherence to the requirements and processes described in the ES&H Manual ensures

  18. 23 CFR Appendix A to Subpart A of... - Special Provisions

    Science.gov (United States)

    2010-04-01

    ... take the following actions: (1) Notices and posters setting forth the contractor's equal employment... subcontractors or subcontractors with meaningful minority group and female representation among their employees... minority group subcontractors or subcontractors with meaningful minority and female representation among...

  19. 48 CFR 931.205-47 - Costs related to legal and other proceedings.

    Science.gov (United States)

    2010-10-01

    ... ENERGY GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial... for a covered contractor or subcontractor, funds advanced by the Department may not be used to finance...

  20. The remedial investigation/feasibility study process at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1993-01-01

    Martin Marietta Energy Systems, Inc. (Energy Systems), manages and operates the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee, under a cost-plus-award-fee contract administered by the Department of Energy's (DOE) Oak Ridge Field office (Field Office). Energy Systems' environmental restoration program is responsible for eliminating or reducing to prescribed safe levels the risks to the environment or to human health and safety posed by inactive and surplus sites and facilities that have been contaminated with radioactive, hazardous, or mixed wastes. Energy Systems subcontracted to perform the remedial investigation and feasibility study (RI/FS) at ORNL. The objective of our audit was to determine if the RI/FS at ORNL had been implemented in a manner that ensured accomplishment of the goals and objectives of the DOE Environmental Restoration Program. The audit disclosed that the subcontractor did not fully meet its contractual requirements. Specifically, environmental data produced by the subcontractor is of questionable value for meeting its contractual requirement to provide data supporting permanent remedial action. This condition occurred because neither the subcontractor nor Energy Systems adequately implemented all essential management controls, and neither Energy Systems nor DOE provided adequate contract administration. As a result, DOE has received little value for its RI/FS expenditures. We have recommended that DOE determine the allowability of an estimated $45 million of subcontractor RI/FS cost at ORNL, plus the cost of Energy Systems administering the subcontract. Furthermore, DOE will continue to pay unnecessary costs and experience cost growth and project delays until effective project management controls are implemented

  1. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  2. 75 FR 82581 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-48; Small Entity Compliance Guide

    Science.gov (United States)

    2010-12-30

    ..., Payrolls and Basic Records to delete the requirement for submission of full social security numbers and... requires contractors and subcontractors to maintain the full social security number and current address of... complete social security numbers and home addresses for individual workers are personal information to the...

  3. 48 CFR 47.505 - Construction contracts.

    Science.gov (United States)

    2010-10-01

    ... as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers... requirements shall not apply to military assistance, foreign aid, or similar projects under the auspices of the... gross tonnage for the project. ...

  4. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  5. PNNL Hoisting and Rigging Manual

    Energy Technology Data Exchange (ETDEWEB)

    Haynie, Todd O.; Fullmer, Michael W.

    2008-12-29

    This manual describes the safe and cost effective operation, inspection, maintenance, and repair requirements for cranes, hoists, fork trucks, slings, rigging hardware, and hoisting equipment. It is intended to be a user's guide to requirements, codes, laws, regulations, standards, and practices that apply to Pacific Northwest National Laboratory (PNNL) and its subcontractors.

  6. Los Alamos National Laboratory Facilities, Security and Safeguards Division, Safeguards and Security Program Office, Protective Force Oversight Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of this document is to identify and describe the duties and responsibilities of Facility Security and Safeguards (FSS) Safeguards and Security (SS) organizations (groups/offices) with oversight functions over the Protection Force (PF) subcontractor. Responsible organizations will continue their present PF oversight functions under the Cost Plus Award Fee (CPAF) assessment, but now will be required to also coordinate, integrate, and interface with other FSS S and S organizations and with the PF subcontractor to measure performance, assess Department of Energy (DOE) compliance, reduce costs, and minimize duplication of effort. The role of the PF subcontractor is to provide the Laboratory with effective and efficient protective force services. PF services include providing protection for the special nuclear material, government property and classified or sensitive information developed and/or consigned to the Laboratory, as well as protection for personnel who work or participate in laboratory activities. FSS S and S oversight of both performance and compliance standards/metrics is essential for these PF objectives to be met

  7. Waste management for Shippingport Station Decommissioning Project: Extended summary

    International Nuclear Information System (INIS)

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station (SSDP) is demonstrating that the techniques and methodologies of waste management, which are currently employed by the nuclear industry, provide adequate management and control of waste activities for the decommissioning of a large scale nuclear plant. The SSDP has some unique aspects in that as part of the objective to promote technology transfer, multiple subcontractors are being utilized in the project. The interfaces resulting from multiple subcontractors require additional controls. Effective control has been accomplished by the use of a process control and inventory system, coupled with personnel training in waste management activities. This report summarizes the waste management plan and provides a status of waste management activities for SSDP

  8. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  9. An Approach for the Analysis of Regulatory Analytes in High Level Radioactive Waste Stored at Hanford, Richland, Washington

    International Nuclear Information System (INIS)

    Wiemers, K.D.; Miller, M.; Lerchen, M.E.

    1999-01-01

    Radiation levels, salt concentration, and the oxidizing nature of the waste dictates modifications to the SW-846 methods. Modified methods will be used to meet target EQLs and QC currently in SW-846. Method modifications will be validated per SW-846 and HASQARD and will be documented consistent with WAC 173-303-910. The affect of modifications to holding times and storage conditions will be evaluated using techniques developed by Maskarinec and Bayne (1996). After validating the methods and performing the holding time study on a minimum of two Phase 1 candidate feed source tank wastes, DOE and Ecology will assess: whether different methods are needed, whether holding time/storage conditions should be altered, whether the high priority analyte list should be refined, and which additional tank waste needs to be characterized

  10. 78 FR 16500 - Rolling Bay, LLC and Indus; Transfer of Data

    Science.gov (United States)

    2013-03-15

    ... contract to perform work for OPP, and access to this information will enable Rolling Bay, LLC and its subcontractor, Indus, to fulfill the obligations of the contract. DATES: Rolling Bay, LLC and its subcontractor... Under Contract No. GS-35F-0072Y, Rolling Bay, LLC and its subcontractor, Indus, will: Capture data that...

  11. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  12. Legal analysis of contract models in a common Nordic electricity retail market

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerneby, Henrik; Alvik, Ivar

    2012-07-01

    The main objective of this study is to consider the legal advantages and disadvantages with different contract models given NordREG's choice of a supplier centric model with mandatory combined billing in a future Nordic end-user market for electricity.At the outset, there are today three relevant categories of agreements in place between customers, suppliers and DSOs in the Nordic electricity retail markets: the electricity supply agreements between customers and suppliers, the grid use agreements between customers and DSOs, and the grid connection agreements usually entered into between customers and DSOs. We have assumed that issues governed by the grid connection agreements will still be entered into by DSOs under a supplier centric model. Two general contract models have on this basis been considered as possible approaches to regulation of electricity supply and grid use terms under a future supplier centric model. The subcontractor model is considered in more detail in chapter 7 of this report. Under this model, the customer enters into a contract with the supplier governing both electricity supply and grid use. The supplier then enters into a separate contract with the DSO for grid use, making the DSO a subcontractor for this service. The Danish wholesale model which will be implemented from 1 October 2014 represents one example of a subcontractor model.The main advantage of the subcontractor model is that it will entitle the customer to envisage the electricity supply, including grid services, as a single service delivered by the supplier. On the other hand, the sub-contractor model will extend the responsibilities of suppliers towards customers. We discuss the advantages and disadvantages of this model further in section 7.2. The power of attorney model is considered in more detail in chapter 8 of this report. Under this model, the customer and the DSO will still formally be contract parties to the grid use agreement, but the supplier will act with a

  13. 75 FR 82565 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-48; Introduction

    Science.gov (United States)

    2010-12-30

    ... delete the requirement for submission of full social security numbers and home addresses of individual... subcontractors to maintain the full social security number and current address of each covered worker, and.... The rule recognizes the Department of Labor's finding that complete social security numbers and home...

  14. Subcontracting Railway Maintenance

    DEFF Research Database (Denmark)

    Thommesen, Jacob

    2010-01-01

    railway infrastructure manager (InfraMan), whichis subcontracting maintenance tasks to other companies. InfraMan has implemented various central elements in managing their subcontractors. The latter are required to present a safety plan as part of their bid, they must be approved if they are to be awarded...

  15. 41 CFR 60-300.1 - Purpose, applicability and construction.

    Science.gov (United States)

    2010-07-01

    ... U.S.C. 4212, or VEVRAA), which requires Government contractors and subcontractors to take... under VEVRAA. (b) Applicability. This part applies to any Government contract or subcontract of $100,000... parallel provisions of this part. (2) Relationship to other laws. This part does not invalidate or limit...

  16. 41 CFR 60-741.1 - Purpose, applicability, and construction.

    Science.gov (United States)

    2010-07-01

    ...), which requires Government contractors and subcontractors to take affirmative action to employ and... Government contracts and subcontracts in excess of $10,000 for the purchase, sale or use of personal property... guidance in interpreting the parallel provisions of this part. (2) Relationship to other laws. This part...

  17. 29 CFR 471.4 - What employers are not covered under this part?

    Science.gov (United States)

    2010-07-01

    ... LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Definitions, Requirements for Employee... 29 Labor 2 2010-07-01 2010-07-01 false What employers are not covered under this part? 471.4...

  18. 76 FR 69736 - Primus Solutions, Inc., and Arctic Slope Regional Corp.; Transfer of Data

    Science.gov (United States)

    2011-11-09

    ... contract to perform work for OPP, and access to this information will enable Primus Solutions, Inc., and its subcontractor, ASRC, to fulfill the obligations of the contract. DATES: Primus Solutions, Inc.... II. Contractor Requirements Under Contract No. EP-W-11-024, Primus Solutions, Inc., and its...

  19. Tolerancing requirements for remote handling at the Hanford vitrification project

    International Nuclear Information System (INIS)

    Keenan, R.M.; Bullis, R.E.; Van Katwijk, C.

    1993-01-01

    The Hanford Waste Vitrification Plant is being designed by Fluor Daniel, Inc. with WasteChem Corporation as Fluor Daniel's major subcontractor specializing in vitrification and remote system technologies. United Engineers and Constructors/Catalytic (UE ampersand C) will construct the plant. Westinghouse Hanford Company (WHC) is the Project Integration manager, manager and as the plant operator provides technical direction to the Architect/Engineer team (A/E) and constructor on behalf of the Department of Energy - Richland Field Office. The A/E has developed, in cooperation with UE ampersand C, WHC and DOE, a new and innovative approach to installations of the many remote nozzles and electrical connectors that must be installed to demanding tolerances. This paper summarizes the key elements of the HWVP approach

  20. 75 FR 52313 - Submission for OMB review; Comment Request

    Science.gov (United States)

    2010-08-25

    ... requirements; (2) increase the overall participation of protege firms as subcontractors and suppliers; and (3) foster the establishment of long-term business relationships between protege firms and major DoD.... Seehra at the Office of Management and Budget, Desk Officer for DoD, Room 10236, New Executive Office...

  1. 77 FR 26232 - Federal Acquisition Regulation; Nondisplacement of Qualified Workers Under Service Contracts

    Science.gov (United States)

    2012-05-03

    ... role. H. Contract clause: The sources of this coverage are section 5 of E.O. 13495 and Appendix A of 29... successor contractor and its subcontractors are required to offer those employees (other than managerial and... managerial and supervisory employees) employed under the predecessor contract whose employment will be...

  2. 41 CFR 60-250.1 - Purpose, applicability and construction.

    Science.gov (United States)

    2010-07-01

    ... U.S.C. 4212, or VEVRAA), which requires Government contractors and subcontractors to take... applies to any Government contract or subcontract of $25,000 or more entered into before December 1, 2003... parallel provisions of this part. (2) Relationship to other laws. This part does not invalidate or limit...

  3. 29 CFR 471.1 - What definitions apply to this part?

    Science.gov (United States)

    2010-07-01

    ... NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Definitions, Requirements for Employee Notice, and... 29 Labor 2 2010-07-01 2010-07-01 false What definitions apply to this part? 471.1 Section 471.1...

  4. 78 FR 42775 - CGI Federal, Inc., and Custom Applications Management; Transfer of Data

    Science.gov (United States)

    2013-07-17

    ... Applications Management, to fulfill the obligations of the contract. DATES: CGI Federal, Inc., and its... its subcontractor, Custom Applications Management, have been awarded a contract to perform work for... available at http://www.epa.gov/dockets . II. Contractor Requirements Under Contract No. GS-35F-4797H, CGI...

  5. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  6. The United States Air Force and the Culture of Innovation, 1945-1965

    Science.gov (United States)

    2002-01-01

    Wooldridge, the triumvirate of organizations—the WDD, the Special Aircraft Projects Office ( SAPO ) of AMC, and R-W—completed the government’s project...Wooldridge Corporation; SAPO = Special Aircraft Projects Of- fice; WDD = Western Development Division; WSPO = Weapon System Project Office. Subcontractor...Subcontractor R-W WSPO WDD SAPO Subcontractor ARDC HQ AMC HQ Establishing WDD’s Authority With his organizational foundations set, Schriever’s immediate

  7. Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Jacobs

    2009-02-26

    The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

  8. 29 CFR 5.26 - “* * * contribution irrevocably made * * * to a trustee or to a third person”.

    Science.gov (United States)

    2010-07-01

    ... STANDARDS PROVISIONS APPLICABLE TO NONCONSTRUCTION CONTRACTS SUBJECT TO THE CONTRACT WORK HOURS AND SAFETY... provide that the cost of such definite benefits, either in full or any balance in excess of specified... insurance company to the contractor or subcontractor of sums paid by him in excess of the amount required to...

  9. Final Technical Report for subcontract number B612144

    Energy Technology Data Exchange (ETDEWEB)

    Mayali, X. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Marcu, O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-11

    The original statement of work stipulated that the Subcontractor shall perform bacterial and algal cultivation and manipulation, microbe isolation, preparation of samples for sequencing and isotopic analysis, data analysis, and manuscript preparation. The Subcontractor shall work closely with Dr. Mayali and other LLNL scientists, and shall participate in monthly SFA meetings (either in person or by telephone). The Subcontractor shall deliver a final report at the conclusion of the work.

  10. Companies which maintain the nuclear fleet - Information note 2015

    International Nuclear Information System (INIS)

    2015-01-01

    This publication first recalls the reasons for subcontracting the maintenance of French nuclear plants (need of specialised expertise and abilities) even though EDF keeps an industrial and technical control. It describes the framework of these subcontracted activities (a long lasting collaboration, implementation of requirements), and how multi-annual markets are subcontracted to support the development of specialised companies. It outlines to which extent the selection and certification process is rigorous, that subcontractor salaried personnel is to be specifically trained, that radiation protection is performed under the same conditions for everybody. It indicates some specific measures which have been implemented to take subcontractor personnel working conditions into account. The updating of abilities for future activities is discussed. Some key data are provided regarding jobs, contracts, training, medical expenses, and fields of activity of subcontracting companies

  11. Bechtel Hanford, Inc./ERC team health and safety plan Environmental Restoration Disposal Facility operations

    International Nuclear Information System (INIS)

    Turney, S.R.

    1996-02-01

    A comprehensive safety and health program is essential for reducing work-related injuries and illnesses while maintaining a safe and health work environment. This document establishes Bechtel Hanford, Inc. (BHI)/Environmental Restoration Contractor (ERC) team requirements, policies, and procedures and provides preliminary guidance to the Environmental Restoration Disposal Facility (ERDF) subcontractor for use in preparing essential safety and health documents. This health and safety plan (HASP) defines potential safety and health issues associated with operating and maintaining the ERDF. A site-specific HASP shall be developed by the ERDF subcontractor and shall be implemented before operations and maintenance work can proceed. An activity hazard analysis (AHA) shall also be developed to provide procedures to identify, assess, and control hazards or potential incidents associated with specific operations and maintenance activities

  12. 48 CFR 44.400 - Scope of subpart.

    Science.gov (United States)

    2010-10-01

    ... SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 44.400 Scope... required to apply to any subcontractors that are furnishing commercial items or commercial components in accordance with Section 8002(b)(2) of Public Law 103-355 and Section 826 of Public Law 110-181 (10 U.S.C...

  13. 48 CFR 970.1504-3-1 - Cost or pricing data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost or pricing data. 970... pricing data. (a) The certification requirements of 48 CFR 15.406-2 are not applied to DOE cost... operating contractors and their subcontractors obtain cost or pricing data prior to the award of a...

  14. Health and safety plan for phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This Health and Safety Plan (HASP) addresses the health and safety (H&S) concerns and requirements for the Bear Creek Valley (BCV) Treatability Study at the Oak Ridge Y-12 Plant. Samples will be collected from effluent following treatment tests of extraction columns, algal mats, and mature wetlands supplied by surface water locations and existing groundwater monitoring well locations. The project Sampling and Analysis Plan addresses the project description, technical objectives, procedures, and planned work activities in greater detail. It is the responsibility of the project managers, field manager, and site health and safety officer (SHSO) to determine that the requirements of this HASP are sufficiently protective. If it is determined that the requirements of this HASP are not sufficiently protective, a field change order(s) (FCO) will be prepared. FCOs will include a completed job hazard analysis or similar worksheet to ensure complete hazard assessment. FCOs must be approved by the Environmental Management and Enrichment Facilities (EMEF) project manager, EMEF H&S manager, subcontractor project or field manager, and subcontractor H&S representative. As a minimum, FCOs will be prepared if additional tasks will be performed or if contaminant exposure is anticipated.

  15. Health and safety plan for phase II of the Bear Creek Valley treatability study Oak Ridge Y-12 plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This Health and Safety Plan (HASP) addresses the health and safety (H ampersand S) concerns and requirements for the Bear Creek Valley (BCV) Treatability Study at the Oak Ridge Y-12 Plant. Samples will be collected from effluent following treatment tests of extraction columns, algal mats, and mature wetlands supplied by surface water locations and existing groundwater monitoring well locations. The project Sampling and Analysis Plan addresses the project description, technical objectives, procedures, and planned work activities in greater detail. It is the responsibility of the project managers, field manager, and site health and safety officer (SHSO) to determine that the requirements of this HASP are sufficiently protective. If it is determined that the requirements of this HASP are not sufficiently protective, a field change order(s) (FCO) will be prepared. FCOs will include a completed job hazard analysis or similar worksheet to ensure complete hazard assessment. FCOs must be approved by the Environmental Management and Enrichment Facilities (EMEF) project manager, EMEF H ampersand S manager, subcontractor project or field manager, and subcontractor H ampersand S representative. As a minimum, FCOs will be prepared if additional tasks will be performed or if contaminant exposure is anticipated

  16. 48 CFR 22.1704 - Violations and remedies.

    Science.gov (United States)

    2010-10-01

    ..., subcontractor, or subcontractor employee uses forced labor in the performance of the contract; or (4) The... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Combating Trafficking in Persons 22...

  17. 42 CFR 414.422 - Terms of contracts.

    Science.gov (United States)

    2010-10-01

    ...)(i) of the Act, if applicable to such subcontractor. (g) Breach of contract. (1) Any deviation from... requirements, constitutes a breach of contract. (2) In the event a contract supplier breaches its contract, CMS... 42 Public Health 3 2010-10-01 2010-10-01 false Terms of contracts. 414.422 Section 414.422 Public...

  18. 24 CFR 266.225 - Labor standards.

    Science.gov (United States)

    2010-04-01

    ... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements... contractors or subcontractors on a project insured under this part shall be paid not less than the wages... accordance with the Davis-Bacon Act, as amended (40 U.S.C. 276a-276a-5), where the project meets all of the...

  19. Statsbygg forces BIM; Statsbygg presser frem BIM

    Energy Technology Data Exchange (ETDEWEB)

    Seehusen, Joachim

    2009-07-01

    Statsbygg requires Building Information Model (BIM) of all contractors and subcontractors when two new buildings are going to be raised at the University of Stavanger. BIM is a 3-D model on a common server where all the information and coding for the building project is gathered. IFC BIM is preferred for standardization. (AG)

  20. 42 CFR 124.4 - Application.

    Science.gov (United States)

    2010-10-01

    ... need program or a program under section 1122 of the Social Security Act, the State Agency shall base... need or a favorable finding under section 1122 of the Social Security Act is required in order for the... or subcontractors in the performance of work on a project will be paid wages at rates not less than...

  1. The Environmental Restoration Contractor Publication and Graphic Services style and resources guide. Revision 1

    International Nuclear Information System (INIS)

    Forbes, C.J.

    1997-06-01

    The Environmental Restoration Contractor (ERC) Publication and Graphic Services (P ampersand GS) Style and Resources Guide (Rev. 1) presents instructions, uniform conventions, guidelines, specifications, requirements, and detailed process steps that will increase efficiency and reduce costs for ERC organizations, including subcontractors. This Guide also identifies P ampersand GS capabilities that can be provided to support ERC multimedia needs

  2. Protecting Contract Workers: Case Study of the US Department of Energy’s Nuclear and Chemical Waste Management

    Science.gov (United States)

    Gochfeld, Michael; Mohr, Sandra

    2007-01-01

    Increased reliance on subcontractors in all economic sectors is a serious occupational health and safety challenge. Short-term cost savings are offset by long-term liability. Hiring subcontractors brings specialized knowledge but also young, inexperienced, inadequately trained workers onto industrial and hazardous waste sites, which leads to increased rates of accidents and injuries. Reliable data on subcontractor occupational health and safety programs and performance are sparse. The US Department of Energy has an excellent safety culture on paper, but procurement practices and contract language deliver a mixed message—including some safety disincentives. Its biphasic safety outcome data are consistent with underreporting by some subcontractors and underachievement by others. These observations are relevant to the private and public sectors. Occupational health and safety should be viewed as an asset, not merely a cost. PMID:17666686

  3. 48 CFR 819.800 - General.

    Science.gov (United States)

    2010-10-01

    ... name(s) and location(s) of their subcontractor(s) and the unit price(s) to be paid. Should these prices be within a range acceptable to VA, the contracting officer will notify SBA of acceptance. (c) The...

  4. 76 FR 37111 - Access to Confidential Business Information by Computer Sciences Corporation and Its Identified...

    Science.gov (United States)

    2011-06-24

    ... Business Information by Computer Sciences Corporation and Its Identified Subcontractors AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA has authorized its contractor, Computer Sciences Corporation of Chantilly, VA and Its Identified Subcontractors, to access information which has...

  5. Tolerancing requirements for remote handling at the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Van Katwijk, C.; Keenan, R.M.; Bullis, R.E.

    1993-01-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed by Fluor Daniel, Inc. with Waste Chem Corporation as Fluor Daniel, Inc.'s major subcontractor specializing in vitrification and remote system technologies. United Engineers and Constructors (UE ampersand C)/Catalytic (UCAT) will construct the plant. Westinghouse Hanford Company is the Project Integration manager and Business manager, and as the plant operator it provides technical direction to the Architect/ Engineer team (A/E) and constructor on behalf of the US Department of Energy - Richland Field Office. The A/E has developed, in cooperation with UE ampersand C, Westinghouse Hanford Company, and the US Department of Energy, a new and innovative approach to installations of the many remote nozzles and electrical connectors that must be installed to demanding tolerances. This paper summarizes the key elements of the HWVP approach

  6. Waste Certification Program Plan for UT-Battelle, LLC at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Beierschmitt, K.J.; Downer, K.M.; Hoke, P.B.

    2000-01-01

    This document defines the waste certification program (WCP) developed and implemented by UT-Battelle, LLC (UT-Battelle) at Oak Ridge National Laboratory (ORNL). The WCP applies to all UT-Battelle personnel, it's subcontractors, guests, and visitors that do work at ORNL. This program does not include wastes generated by other U.S. Department of Energy (DOE) prime contractors, their employees, or their subcontractors working on this site except by special arrangement. The document describes the program structure, logic, and methodology for certification of UT-Battelle wastes. The purpose of the WCP is to provide assurance that wastes are properly characterized, that adequate information is provided to enable correct U.S. Department of Transportation (DOT) classification, and that the programmatic certification requirements and the Waste Acceptance Criteria (WAC) for receiving organizations/facilities are met. The program meets the waste certification requirements outlined in DO E Order 435.1, ''Radioactive Waste Management,'' in the DOE Performance Objective for Certification of Non-Radioactive Hazardous Waste (DOE, February 1995), and ensures that 40 Code of Federal Regulations (CFR) documentation requirements for waste characterization are met for mixed (both radioactive and hazardous) and hazardous (including polychlorinated biphenyls (PCBs)) waste. Program activities are conducted according to ORNL directives and guidance.

  7. 75 FR 78238 - Access to Confidential Business Information by Science Applications International Corporation and...

    Science.gov (United States)

    2010-12-15

    ... Business Information by Science Applications International Corporation and Its Identified Subcontractors..., Science Applications International Corporation (SAIC) of San Diego, CA, and Its Identified Subcontractors... Control Act (TSCA). Some of the information may be claimed or determined to be Confidential Business...

  8. 78 FR 66697 - Access to Confidential Business Information by Science Applications International Corporation and...

    Science.gov (United States)

    2013-11-06

    ... Business Information by Science Applications International Corporation and Its Identified Subcontractors..., Science Applications International Corporation (SAIC) of McLean, VA, and its subcontractors to access...). Some of the information may have been claimed or determined to be Confidential Business Information...

  9. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Science.gov (United States)

    2010-10-01

    ... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... disadvantaged business, and women-owned small business subcontractors to the maximum practicable extent. The..., service-disabled veteran-owned small business, HUBZone small business, or women-owned small business...

  10. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  11. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  12. 77 FR 54864 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2012-09-06

    ....g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report... applicable) (e.g.; late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to... that allowing contractors to ``report to the CPARS system'' would have a negative impact on future...

  13. Workers' strategies to cope with increasing deterioration of working conditions in the cleaning sector.

    Science.gov (United States)

    Krzeslo, Estelle; Lebeer, Guy; De Troyer, Marianne

    2014-01-01

    Employees working for office-cleaning companies are directly affected by the growing competition in this sector. They face a heavier workload and heightened psychological pressure. A majority of these workers are less qualified women working part-time, with flexible and inconvenient schedules. The objective of the study is to highlight the workers' strategies to deal with fast work, schedule requirements and the consequent difficulties to reconcile their professional and private life commitments. This study is based on in-depth interviews. One hundred and twenty-five male and female workers responsible for cleaning offices. The themes generated from the results highlight a continued deterioration in working conditions in this sector. They also show that even approximate respect of the theoretical workload as calculated by the sub-contractor and the client company mainly depends on the workers' subjective strategies to accommodate increasingly fragmented work hours with their private lives. In conclusion, since these individual strategies are not enough to make up for the deterioration in work conditions, improving them requires sub-contractors and client companies to agree on organisational arrangements that take into account the reality of the employees' lives.

  14. 32 CFR Table 1 to Part 855 - Purpose of Use/Verification/Approval Authority/Fees

    Science.gov (United States)

    2010-07-01

    ... purpose of use may be to gain access to collocated private sector facilities as authorized by lease... * authority Fees Contractor or subcontractor (A). A US or foreign contractor or subcontractor, operating... of government business. One time authorization can be provided when an authorized US Government...

  15. 78 FR 67139 - Access to Confidential Business Information by Eastern Research Group and Its Identified...

    Science.gov (United States)

    2013-11-08

    ... Business Information by Eastern Research Group and Its Identified Subcontractor, Energy Services, Inc..., Eastern Research Group (ERG) of Chantilly, VA, and subcontractor Energy Services, Inc., of Tallahassee, FL... Control Act (TSCA). Some of the information may be claimed or determined to be Confidential Business...

  16. NPP Design Basis Handover and Knowledge Preservation from Subcontractors, Vendors and EPC

    International Nuclear Information System (INIS)

    Freeland, Kent

    2013-01-01

    Using PLM-based Workflow for Configuration Management (CM) in the Nuclear Power Industry Advantages – some work to do! • NPP’s must adapt to using PLM-based solutions to support CM and to synchronize design changes to asset or product changes, and reduce “slipstreaming”. In the NPP world, this often appears as events that circumvent CM – for example, non-approved parts substitutions and “temporary” plant modifications that are never removed. • PLM serves as the method for unifying the application of requirements to design changes, processes and workflow. In NPP’s, requirements are generally considered only relevant to designs – not process and workflow. • PLM supports Configuration Management and Design Basis in Regulator Action Tracking for NPP’s, and application of PLM-based CM to regulator action and compliance systems. This is a poorly-understood application of CM in NPP’s, yet these elements control large parts of the NPP design basis. • Suppliers, EPC’s and Technology Vendors must also understand the role of CM, SE and PLM in construction of new standards-driven NPP designs (like EPR and Westinghouse AP-1000 NPP designs), as well as understanding the role and handling of Knowledge Systems

  17. Two-echelon logistics service supply chain decision game considering quality supervision

    Science.gov (United States)

    Shi, Jiaying

    2017-10-01

    Due to the increasing importance of supply chain logistics service, we established the Stackelberg game model between single integrator and single subcontractors under decentralized and centralized circumstances, and found that logistics services integrators as a leader prefer centralized decision-making but logistics service subcontractors tend to the decentralized decision-making. Then, we further analyzed why subcontractor chose to deceive and rebuilt a principal-agent game model to monitor the logistics services quality of them. Mixed Strategy Nash equilibrium and related parameters were discussed. The results show that strengthening the supervision and coordination can improve the quality level of logistics service supply chain.

  18. Sistem Pendukung Keputusan Pemilihan Subkontrak Menggunakan Metode Entropy dan TOPSIS

    Directory of Open Access Journals (Sweden)

    Jamila Jamila

    2011-07-01

    Full Text Available Abstract— Outsourcing is a part of production process of manufacturing industry which contribute for suitainability of a manufacture process. Choosing appropriate subcontractor which match spesification is not easy. In order to help company in determining credible subcontractors is needed a decision support system. Selection of decision support system for the production of subcontracting gloves uses Entropy and TOPSIS methods. Entropy method is used to give weight to the criteria. TOPSIS (Technique for Order Preference by Similarity to Ideal Solution method is used to select the best subcontractors, where subcontracting was elected not only has the shortest distance from the positive ideal solution but it also has the longest distance from the negative ideal solution. Designing of systems use ERD and DFD for identifying the needs of users and systems, and as for guiding the software implementation. The results of this research are the establishment of an application used to select subcontractors based on established criteria. Test results on the application can provide decision input/suggestion, although the criteria used in making decision is different. Subcontract selection decision support system can be an alternative to choose subcontractors for the production of gloves in PT. Adi Satria Abadi Yogyakarta. Keywords— DSS, Decision Support  System,  Entropy, TOPSIS, Subcontract

  19. 5 CFR 1315.14 - Payments under construction contracts.

    Science.gov (United States)

    2010-01-01

    ... the contract; (ii) Payments to subcontractors and suppliers have been made from previous payments... withhold or retain from a subcontractor or supplier, in accordance with the terms and conditions of their..., increments, or segments of any project) that is approved as payable by the agency pursuant to paragraph (b...

  20. Consolidated Ground Segment Requirements for a UHF Radar for the ESSAS

    Science.gov (United States)

    Muller, Florent; Vera, Juan

    2009-03-01

    ESA has launched a nine months long study to define the requirements associated to the ground segment of a UHF (300-3000 MHz) radar system. The study has been awarded in open competition to a consortium led by Onera, associated to the Spanish companies Indra and its sub-contractor Deimos. After a phase of consolidation of the requirements, different monostatic and bistatic concepts of radars will be proposed and evaluated. Two concepts will be selected for further design studies. ESA will then select the best one, for detailed design as well as cost and performance evaluation. The aim of this paper is to present the results of the first phase of the study concerning the consolidation of the radar system requirements. The main mission for the system is to be able to build and maintain a catalogue of the objects in low Earth orbit (apogee lower than 2000km) in an autonomous way, for different sizes of objects, depending on the future successive development phases of the project. The final step must give the capability of detecting and tracking 10cm objects, with a possible upgrade to 5 cm objects. A demonstration phase must be defined for 1 m objects. These different steps will be considered during all the phases of the study. Taking this mission and the different steps of the study as a starting point, the first phase will define a set of requirements for the radar system. It was finished at the end of January 2009. First part will describe the constraints derived from the targets and their environment. Orbiting objects have a given distribution in space, and their observability and detectability are based on it. It is also related to the location of the radar system But they are also dependant on the natural propagation phenomenon, especially ionospheric issues, and the characteristics of the objects. Second part will focus on the mission itself. To carry out the mission, objects must be detected and tracked regularly to refresh the associated orbital parameters

  1. 48 CFR 252.215-7000 - Pricing adjustments.

    Science.gov (United States)

    2010-10-01

    ... clauses entitled “Price Reduction for Defective Cost or Pricing Data—Modifications,” “Subcontractor Cost or Pricing Data,” and “Subcontractor Cost or Pricing Data—Modifications,” means the aggregate increases and/or decreases in cost plus applicable profits. (End of clause) [56 FR 36479, July 31, 1991, as...

  2. 75 FR 82010 - AceInfo Solutions and Avaya Government Solutions, Koansys LLC, and Quality Associates Inc...

    Science.gov (United States)

    2010-12-29

    ... Associates Inc., to fulfill the obligations of the contract. DATES: AceInfo Solutions and its subcontractors... Inc. have been awarded a contract to perform work for OPP, and access to this information will enable... Contract No. GS-06F-0337Z, AceInfo Solutions and its subcontractors, Avaya Government Solutions, Koansys...

  3. 75 FR 33269 - Procurement List; Additions

    Science.gov (United States)

    2010-06-11

    ... may have ever provided a product or service to the government-- only the current or most recent... and made a best value selection of its subcontractor and is expected to show competition for its subcontractor every five years. The Committee's responsibility under the Javits-Wagner-O'Day Act (41 U.S.C. 46...

  4. 78 FR 32250 - CDM Smith and Dynamac Corp; Transfer of Data

    Science.gov (United States)

    2013-05-29

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2013-0036; FRL-9387-5] CDM Smith and Dynamac Corp... the submitter, will be transferred to CDM Smith and its subcontractor, Dynamac Corp, in accordance with 40 CFR 2.307(h)(3) and 2.308(i)(2). CDM Smith and its subcontractor, Dynamac Corp, have been...

  5. DURABILITY-RELATED CHARACTERISTICS OF DOUBLE-LAYER STRUCTURES OF PIPELINES CONNECTED TO POLYMERIC SLEEVES

    Directory of Open Access Journals (Sweden)

    Orlov Vladimir Alexandrovich

    2012-10-01

    The ultimate objective of the software programme is to assess the applicability of the trenchless repair method involving a polymeric sleeve in each specific case by taking account of the environment and the condition of the pipeline. The software is also capable of developing the requirements to be fulfilled by subcontractors in order to assure the appropriate quality of any repair work performed and the reliability of any pipeline sections repaired.

  6. Component design for LMFBR's

    International Nuclear Information System (INIS)

    Fillnow, R.H.; France, L.L.; Zerinvary, M.C.; Fox, R.O.

    1975-01-01

    Just as FFTF has prototype components to confirm their design, FFTF is serving as a prototype for the design of the commercial LMFBR's. Design and manufacture of critical components for the FFTF system have been accomplished primarily using vendors with little or no previous experience in supplying components for high temperature sodium systems. The exposure of these suppliers, and through them a multitude of subcontractors, to the requirements of this program has been a necessary and significant step in preparing American industry for the task of supplying the large mechanical components required for commercial LMFBR's

  7. Subcontractors and Component Suppliers in the Swedish Wind Power Industry

    International Nuclear Information System (INIS)

    Takeuchi, Linn

    2003-05-01

    This paper studies the Swedish component suppliers in the wind power industry. This group has not received much attention so far, and today very little is known. This study addresses the fact that the Swedish component suppliers have not been able to penetrate the wind power market despite the Swedish industry's strength in mechanical and electrical engineering. The aims of this paper were to gather information regarding the existing production and to identify factors that affect the Swedish component suppliers' scope to penetrate the wind turbine market. To date, although Sweden has spent considerable amounts of money on projects involving wind turbines, there is no series production of large wind turbines in Sweden. The historical development of the wind turbine industry suggests this alone would have inhibited the development of component production in Sweden. Yet, the country's proximity and good access to large wind turbine producing countries should be an advantage. Various factors and issues are identified and discussed in this paper that are relevant for the Swedish component suppliers' scope to penetrate the wind turbine market. These include market and product development, buyer-supplier relationships, export and sourcing behaviors, and time of market entry. This is a first step towards increasing the knowledge of Swedish component production and it is recognized that more studies are required. Various areas where relevant knowledge is largely missing or scarce are identified and discussed as well, and should serve as relevant starting points for continued research

  8. After $74-Million and Counting, Frank Gehry's Library Opens at Princeton

    Science.gov (United States)

    Carlson, Scott

    2008-01-01

    In putting up its new, Frank Gehry-designed Lewis Library, Princeton University endured its share of challenges. It constructed models of the building to give the subcontractors a chance to practice. It fired a contractor halfway through the job when the building was past due. It learned that some subcontractors were trying to bribe their way onto…

  9. Closure of a unique mixed waste storage canal at the Dept. of Energy's Oak Ridge National Laboratory (ORNL)

    International Nuclear Information System (INIS)

    Greer, J.K. Jr.; Etheridge, J.T.; Thompson, W.T.

    1994-01-01

    At the Department of Energy's (DOE's) Oak Ridge National Laboratory (ORNL) a unique closure was accomplished for a storage canal that contained both hazardous chemical contaminants controlled by the Resource Conservation and Recovery Act (RCRA), and radioactive contaminants controlled by the Atomic Energy Act (AEA). During 1991 and 1992, after approvals were received from the DOE and the Tennessee Department of Environment and Conservation (TDEC), subcontractors to DOE's Construction Manager were mobilized and remote controlled equipment was operated on site to remove the RCRA and radioactive contamination (referred to hereafter as mixed wastes) from the 3001 Storage Canal at ORNL. After numerous open-quotes surprisesclose quotes during the removal activities, each requiring problem resolution and approvals from DOE and TDEC, the canal closure was completed in September 1992 and final closure certification was submitted to TDEC in October 1992. The following discussion describes the learning experiences that ORNL and DOE acquired from a RCRA closure project for a mixed waste storage canal containing high radiation levels. The project was successful, especially since worker exposures were minimized, but was lengthy, requiring 30 months from notification of a leak in the canal until final demobilization of the subcontractor, and expensive to complete (total overall cost of $3 million)

  10. Subcontractors and Component Suppliers in the Swedish Wind Power Industry

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, Linn

    2003-05-01

    This paper studies the Swedish component suppliers in the wind power industry. This group has not received much attention so far, and today very little is known. This study addresses the fact that the Swedish component suppliers have not been able to penetrate the wind power market despite the Swedish industry's strength in mechanical and electrical engineering. The aims of this paper were to gather information regarding the existing production and to identify factors that affect the Swedish component suppliers' scope to penetrate the wind turbine market. To date, although Sweden has spent considerable amounts of money on projects involving wind turbines, there is no series production of large wind turbines in Sweden. The historical development of the wind turbine industry suggests this alone would have inhibited the development of component production in Sweden. Yet, the country's proximity and good access to large wind turbine producing countries should be an advantage. Various factors and issues are identified and discussed in this paper that are relevant for the Swedish component suppliers' scope to penetrate the wind turbine market. These include market and product development, buyer-supplier relationships, export and sourcing behaviors, and time of market entry. This is a first step towards increasing the knowledge of Swedish component production and it is recognized that more studies are required. Various areas where relevant knowledge is largely missing or scarce are identified and discussed as well, and should serve as relevant starting points for continued research.

  11. Integrating total quality management principles with the requirements of DOE Order 5700.6C

    Energy Technology Data Exchange (ETDEWEB)

    Hedges, D. [Scientific Ecology Group, Inc. (United States)

    1993-03-01

    The Department of Energy has recently required its field offices, contractors, and subcontractors to implement DOE Order 5700.6C, ``Quality Assurance,`` for all work on waste management contracts. The order restructures the 18 criteria of NQA-1 and focuses on the role of management in achieving and assuring quality, performance of activities to achieve and assure quality, and management`s assessment of its performance for the purpose of identifying improvements to be made. The DOE order also introduces elements of the total quality management (TQM) philosophy, which were not present in DOE Order 5700.6B. The research community within DOE has recently issued a document entitled DOE Order 5700.6C Implementation Guide, which is more explicit about the integration of TQM principles with the implementation of DOE Order 5700.6C in research facilities. The Environmental Protection Agency is sponsoring a quality assurance standard (ANSI/ASQC E-4) to replace EPA`s QAMS 005/80. The new standard is consistent with DOE Order 5700.6C, and it also stresses the integration of TQM principles within the quality assurance process. This paper discusses the intent and philosophy of the 10 criteria of the new DOE order, the status of ANSI/ASQC E-4, and how to effectively integrate TQM principles into the quality assurance process as the conversion is made from NQA-1 to DOE Order 5700.6C. The purpose and value of DOE Order 5700.6C Implementation Guide for research will also be discussed.

  12. GSG-GIS development program plan

    International Nuclear Information System (INIS)

    Lee, R.C.

    1992-01-01

    For the past 40 years, the Savannah River Site (SRS) has been subjected to numerous geological and geotechnical investigations in support of facility construction and waste site development and remediation. Over this period,.a variety of different subcontractors have collected large quantities of geoscience data. In addition, current programs involve numerous investigators from different departments, and consequently, earth science data and interpretations are scattered among the departments, investigators, and subcontractors at SRS. As a result, scientific and management decisions cannot take advantage of the significant body of information that exists at SRS. Recent DOE Orders (Systematic Evaluation Program, 1991) have put specific requirements on their contractors to compile geological databases to coordinate DOE site data gathering and interpretations, and to assist in compiling safety analysis reports. The Earth Science Advisory Committee and the Environmental Advisory Committee have also made specific recommendations on the management of SRS geoscience data. This plan describes a management system to identify, communicate, and compile SRS geological (including geohydrologic), seismological, and geotechnical (656) data and interpretations on a Geographic Information System (GIS)

  13. SAFETY IMPROVES DRAMATICALLY IN FLUOR HANFORD SOIL AND GROUNDWATER REMEDIATION PROJECT

    International Nuclear Information System (INIS)

    GERBER MS

    2007-01-01

    This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walkdowns, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site

  14. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF's management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES ampersand H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES ampersand H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES ampersand H support organizations and administrative groups, and describes their interactions with the NIF Program

  15. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF`s management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES&H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES&H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES&H support organizations and administrative groups, and describes their interactions with the NIF Program.

  16. Spent fuel pool cleanup and stabilization

    International Nuclear Information System (INIS)

    Miller, R.L.

    1987-06-01

    Each of the plutonium production reactors at Hanford had a large water-filled spent fuel pool to provide interim storage of irradiated fuel while awaiting shipment to the separation facilities. After cessation of reactor operations the fuel was removed from the pools and the water levels were drawn down to a 5- to 10-foot depth. The pools were maintained with the water to provide shielding and radiological control. What appeared to be a straightforward project to process the water, remove the sediments from the basin, and stabilize the contamination on the floors and walls became a very complex and time consuming operation. The sediment characteristics varied from pool to pool, the ion exchange system required modification, areas of hard-pack sediments were discovered on the floors, special arrangements to handle and package high dose rate items for shipment were required, and contract problems ensued with the subcontractor. The original schedule to complete the project from preliminary engineering to final stabilization of the pools was 15 months. The actual time required was about 25 months. The original cost estimate to perform the work was $2,651,000. The actual cost of the project was $5,120,000, which included $150,000 for payment of claims to the subcontractor. This paper summarizes the experiences associated with the cleanup and radiological stabilization of the 100-B, -C, -D, and -DR spent fuel pools, and discusses a number of lessons learned items

  17. Alcohol drinking behaviors and alcohol management policies under outsourcing work conditions: A qualitative study of construction workers in Taiwan.

    Science.gov (United States)

    Cheng, Wan-Ju; Cheng, Yawen

    2016-02-01

    Workplace alcohol policies are crucial for workers' health and safety. The practice of outsourcing is gaining popularity around the world and was found to be associated with poorer health in the working population. This study aimed to examine how outsourcing complicates the implementation of workplace alcohol policies and affects workers' drinking behaviors. In-depth interviews were conducted with 16 outsource workers, 3 subcontractors and 3 worksite supervisors. Information regarding workers' drinking behaviors, their knowledge, and attitudes toward workplace alcohol policy were analyzed using a qualitative thematic analysis. Factors associated with poor workplace alcohol management included smaller size and private ownership of outsourcers, subcontractors' own drinking behavior and positive attitude to alcohol, and precarious employment conditions of outsourcing workers. The multilateral relationship between outsourcers, subcontractors, and workers complicated and impaired the implementation of workplace alcohol policies. The implementation of workplace alcohol management policies was hampered in outsourcing work conditions due to poor coordination of supervisors in the subcontract chain. The enforcement of alcohol policies in the workplace should be strengthened by consolidating management responsibilities of outsourcers and subcontractors. Copyright © 2015 Elsevier B.V. All rights reserved.

  18. Quality assurance and the sub-contract interface: co-operative evaluation

    International Nuclear Information System (INIS)

    Churchill, G.F.; Rippon, D.J.

    1977-01-01

    The CEGB standard QA 42-1 quality assurance programme requires purchasers to establish supplier selection and assessment procedures either by previous continuous record of supplying identical or equivalent material satisfactorily, or by an evaluation of the sub-contractors quality system. In order to avoid the multiple evaluations that the latter would involve for projects such as nuclear power stations, which concern a hierarchy of organisations, the idea of co-operative evaluations was suggested. The requirements involved in establishing co-operative evaluations are discussed. Some potential difficulties which have been identified from experience are described. (U.K.)

  19. Up and Down the Multinational Corporations’ Global Labor Supply chains: Making Remedies that Work in China

    OpenAIRE

    Brown, Ronald C.

    2017-01-01

    Today, multinational and domestic corporations in many industries are no longer self-contained vertical structures with permanent staff, but increasingly are horizontal organizations with fissured employment characteristics using outsourcing, franchising, and subcontracting with contractors and chains of subcontractors. Too often, the workers of the subcontractors suffer the consequences of the subcontractors’ cost cutting measures, work in unfavorable conditions, and have low wages and few b...

  20. Overview of Task 4 nuclide transport data

    International Nuclear Information System (INIS)

    Serne, R.J.

    1977-01-01

    A multi-year program plan is presented to collect the necessary data on nuclide sorption-desorption interactions with geologic media. Detailed activities which need to be performed in each of the six subtasks are described. The general areas in which each subcontractor performed work in FY 77 were presented in the overview. Detailed technical discussions of each subcontractor's work will be presented in ensuing presentations

  1. Test plan for spent fuel cladding containment credit tests

    International Nuclear Information System (INIS)

    Wilson, C.N.

    1983-11-01

    Lawrence Livermore National Laboratory has chosen Westinghouse Hanford Company as a subcontractor to assist them in determining the requirements for successful disposal of spent fuel rods in the proposed Nevada Test Site repository. An initial scoping test, with the objective of determining whether or not the cladding of a breached fuel rod can be given any credit as an effective barrier to radionuclide release, is described in this test plan. 8 references, 2 figures, 4 tables

  2. Meeting increased logistical demands : Developing as a small- and medium-sized system supplier

    OpenAIRE

    Carlsson, Inga-Lill

    2009-01-01

    Many subcontractors choose to implement a strategy of “system supply” in order to meetincreasing global competition. They are then confronted with increased demands to take agreater overall responsibility in this role. It is important to investigate the implications of theseresponsibilities before investing in developing the organization, especially for a small- ormedium-sized subcontractor with limited resources. The customer’s view of different demandsdoes not necessarily correspond to how ...

  3. NIF conventional facilities construction health and safety plan

    International Nuclear Information System (INIS)

    Benjamin, D W

    1998-01-01

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply

  4. Experience in constructing a spent nuclear fuel reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Hashimoto, K.; Sakuma, A.; Inoue, K.

    1977-01-01

    Towards the end of 1970, Japan Gasoline Co. Ltd. (JGC) and Saint-Gobain Techniques Nouvelles of France received an order for the construction of a reprocessing plant from Power Reactor and Nuclear Fuel Development Corporation, as a joint prime contractor. The work executed by JGC in this project is reported and consisted of: (1) Procurement, inspection and schedule control of equipment and materials other than those imported from Europe; (2) Conclusion of contracts with various subcontractors relating to the building construction, piping and other work; and (3) Supervision of field work. The field work began in June 1971 and was completed in about 40 months. The overall field labour mobilized during that time totalled about 410,000 man-days, and 900,000 man-hours were spent by the JGC engineers. With the object of constructing a high-quality plant, JGC since 1969 has started to investigate subcontractors in Japan as well as undertaking the selection, education and training of prospective subcontractors. For the welding work in particular, techniques were imported from France and domestic techniques were developed at the same time. Completion of the blank tests was estimated to require 33 months, but the schedule was delayed about seven months for various reasons. Obviously there is room for many improvements when constructing future nuclear chemical plants. However, careful consideration should also be given from the basic design stage onward, to the methods and sequence of construction so that a simplified plan can be obtained from which the work could be easily executed without resorting to special technology. This would lead to reduction in construction time, and a safer and more reliable plant at lower cost. (author)

  5. Intercultural Competence in International Software R&D Cooperation. Toward a Conceptual Framework

    DEFF Research Database (Denmark)

    Skaates, Maria Anne

    2001-01-01

    As part of a research project on cooperation between software development subcontractors from small countries and foreign customers, the dynamics of intercultural competence are being examined. This paper builds a conceptual bridge by developing a definition of organizational intercultural....... It is envisioned that the presented novel framework could be helpful to software developing subcontractors from small national states who already use the competence terminology in discussions of their firms' capabilities and strategies....

  6. SAFETY IMPROVES DRAMATICALLY IN FLUOR HANFORD SOIL AND GROUNDWATER REMEDIATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    GERBER MS

    2007-12-05

    This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walkdowns, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site.

  7. Security of payment in Malaysian construction industry: issues on sub-contract's direct payment

    OpenAIRE

    Supardi, Azizan; Adnan, Hamimah

    2011-01-01

    In Malaysia, sub-contractors have to bear with the current structure of payment mechanisms in the standard forms of contract, which are payment upon certification, direct payment from the employer, and contingent or conditional payment. However, „direct payment‟ provision is applied for in most of the nominated sub-contracts and not to the domestic sub-contractors; thus the Construction Industry Payment and Adjudication (CIPA) Act is proposed. This paper, though, is to disclose the findings o...

  8. Quality assurance and the sub-contract interface: co-operative evaluations

    International Nuclear Information System (INIS)

    Churchill, G.F.; Rippon, D.J.

    1976-01-01

    A common feature of all contemporary Quality Assurance Standards is the requirement for organisations, when carrying out purchasing activities, to select their suppliers on the basis of either a proven record or demonstrated quality capability. In particular the C.E.G.B. Standard QA42-1 Quality Assurance Programme, which the C.E.G.B. will apply to their future major projects, requires purchasers to establish supplier selection and assessment procedures using one or other of the following methods: (a) a previous continuous record of supplying identical or equivalent material to a satisfactory standard; or (b) an evaluation of the sub-contractor's quality assurance system to determine his ability to satisfy the procurement requirements. Co-operative evaluations, where there are several suppliers, are discussed. (author)

  9. The Single And Multi Project Approach To Planning And Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2008-01-01

    The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced with the chall......The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced...

  10. ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL & GAS FIELDS IN NEW MEXICO AND WYOMING

    Energy Technology Data Exchange (ETDEWEB)

    Peggy Robinson

    2004-07-01

    This report contains a summary of activities of Gnomon, Inc. and five subcontractors that have taken place during the first six months of 2004 (January 1, 2004-June 30, 2004) under the DOE-NETL cooperative agreement: ''Adaptive Management and Planning Models for Cultural Resources in Oil & Gas Fields in New Mexico and Wyoming'', DE-FC26-02NT15445. Although Gnomon and all five subcontractors completed tasks during these six months, most of the technical experimental work was conducted by the subcontractor, SRI Foundation (SRIF). SRIF created a sensitivity model for the Azotea Mesa area of southeastern New Mexico that rates areas as having a very good chance, a good chance, or a very poor chance of containing cultural resource sites. SRIF suggested that the results of the sensitivity model might influence possible changes in cultural resource management (CRM) practices in the Azote Mesa area of southeastern New Mexico.

  11. Applied ALARA Workshops Richland, Washington

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  12. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  13. Concept of Draft International Standard for a Unified Approach to Space Program Quality Assurance

    Science.gov (United States)

    Stryzhak, Y.; Vasilina, V.; Kurbatov, V.

    2002-01-01

    For want of the unified approach to guaranteed space project and product quality assurance, implementation of many international space programs has become a challenge. Globalization of aerospace industry and participation of various international ventures with diverse quality assurance requirements in big international space programs requires for urgent generation of unified international standards related to this field. To ensure successful fulfillment of space missions, aerospace companies should design and process reliable and safe products with properties complying or bettering User's (or Customer's) requirements. Quality of the products designed or processed by subcontractors (or other suppliers) should also be in compliance with the main user (customer)'s requirements. Implementation of this involved set of unified requirements will be made possible by creating and approving a system (series) of international standards under a generic title Space Product Quality Assurance based on a system consensus principle. Conceptual features of the baseline standard in this system (series) should comprise: - Procedures for ISO 9000, CEN and ECSS requirements adaptation and introduction into space product creation, design, manufacture, testing and operation; - Procedures for quality assurance at initial (design) phases of space programs, with a decision on the end product made based on the principle of independence; - Procedures to arrange incoming inspection of products delivered by subcontractors (including testing, audit of supplier's procedures, review of supplier's documentation), and space product certification; - Procedures to identify materials and primary products applied; - Procedures for quality system audit at the component part, primary product and materials supplier facilities; - Unified procedures to form a list of basic performances to be under configuration management; - Unified procedures to form a list of critical space product components, and unified

  14. Scope of work-supplemental standards-related fieldwork - Salt Lake City UMTRA Project Site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1996-01-01

    This scope of work governs the field effort to conduct transient in situ (hereafter referred to by the trademark name HydroPunch reg-sign) investigative subsurface logging and ground water sampling, and perform well point installation services at the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Salt Lake City, Utah. The HydroPunch reg-sign and well point services subcontractor (the Subcontractor) shall provide services as stated herein to be used to investigate the subsurface, collect and analyze ground water samples, and install shallow well points

  15. Remedial action and waste disposal project: 100-B/C remedial action readiness report

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-07-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the 100-B/C source sites remediation. The 100-B/C Area is located at the Hanford Site in Richland, Washington. The evaluation was conducted at the conclusion of a series of readiness activities that began in May 1996. These activities included confirming the completion of project specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, approval of subcontractor submittals, and mobilization and construction of site support systems

  16. Systems engineering at the Superconducting Super Collider (one year later)

    International Nuclear Information System (INIS)

    Nonte, J.

    1991-03-01

    After one year of systems engineering at the Superconducting Super Collider (SSC), the project baseline of costs, schedule milestones, and top-level (point design) physics parameters has been accepted by the Department of Energy (DOE). This paper describes the role of systems engineering in developing the baseline and in establishing requirements specifications, change control, and methods of tracking to a baseline. The differences between the Department of Defense and DOE--specifically at the SSC Laboratory (SSCL)--in application of systems engineering disciplines and tools are discussed. The aim of the paper is to inform participating industries of the anticipated requirements format and of the emphasis that will be placed on physics requirements as opposed to procedures. Industry subcontractors should have a better understanding of the systems engineering expected by the SSCL. 3 figs

  17. Data base management plan for the remedial investigation/feasibility study at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-11-01

    This Data Base Management (DBM) Plan has been prepared for use by Bechtel National, Inc. (Bechtel) and its subcontractors in the performance of the Oak Ridge National Laboratory (ORNL) Remedial Investigation/Feasibility Study (RI/FS) program activities. The RI/FS program is being performed under subcontract to Martin Marietta Energy Systems, Inc. (Energy Systems), the contractor operating ORNL for the Department of Energy. This DBM Plan defines the procedures and protocol to be followed in developing and maintaining the data base used by Bechtel and its subcontractors for RI/FS activities at ORNL; describes the management controls, policies, and guidelines to be followed; and identifies responsible positions and their Energy Systems functions. The Bechtel RI/FS data base will be compatible with the Oak Ridge Environmental Information System and will include data obtained from field measurements and laboratory and engineering analyses. Personnel health and safety information, document control, and project management data will also be maintained as part of the data base. The computerized data management system is being used to organize the data according to application and is capable of treating data from any given site as a variable entity. The procedures required to implement the DBM Plan are cross-referenced to specific sections of the plan

  18. Development of a system utilizing data of risk assessment

    International Nuclear Information System (INIS)

    Nagasaka, Akihiko; Takano, Kenichi; Ebisu, Mitsuhiro; Aikawa, Tadashi; Hayase, Kenichi

    2004-01-01

    This report deals with a concrete method of utilizing data of risk assessment. First, the authors point out the necessity to assess all stages of jobs (planning, meeting with contractors, performing phase of task, etc.) in risk assessment bout jobs in electric power company, because most jobs are performed by contract system and risks of a job are distributed over electric company, contractors and subcontractors. Secondly, risks estimated from past accidents and near-miss events must be included. If these 2 requirements are fulfilled, data of risk assessment can be more useful. Then below 4 forms of present data of risk assessment were developed. A form to be used in job planning stage in electric companies for efficient investment planning in safety measures. A form to be used in meetings between electric companies and contractors for checking accident prevention methods. A form to be used in meetings between contractors and subcontractors for enhancing a shared awareness of risk. A form to be used in tool box meetings for confirming safe condition and inheriting of ability of risk perception. Additionally, a data base system of risk assessment about 4 jobs was developed. This system prints out about 4 forms for each job and is useful for PDCA of safety activities. (author)

  19. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A.

    2013-01-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  20. Importance of the licensing process on the safety culture in the Brazilian nuclear fuel cycle facilities

    Energy Technology Data Exchange (ETDEWEB)

    Motta, E.S.; Sousa, A.L.B. de; Paiva, R.L.C. de; Mezrahi, A., E-mail: emotta@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2013-07-01

    The main objective of the Nuclear Fuel Cycle Facilities licensing processes is to ensure the safety of these installations in their entire life cycle (in the installation site selection, designing, construction, pre-operational tests, operational and decommissioning phases). The Brazilian licensing process requires from the operator, among others, before the operating license: (I) a Site Report and a Final Safety Analysis Report, ensuring that all safety related issues are adequately analyzed and understood; (II) a formal structured Management System focused on the installation safety; and (III) dissemination of safety related information to all involved operator employees and subcontractors. Therefore, these requirements reflect in an adequate operator actions and practices, ensuring a working environment with a high level of safety culture. (author)

  1. Breckinridge Project, initial effort. Report III, Volume 2. Specifications

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Report III, Volume 2 contains those specifications numbered K through Y, as follows: Specifications for Compressors (K); Specifications for Piping (L); Specifications for Structures (M); Specifications for Insulation (N); Specifications for Electrical (P); Specifications for Concrete (Q); Specifications for Civil (S); Specifications for Welding (W); Specifications for Painting (X); and Specifications for Special (Y). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available for the Initial Effort (Phase Zero) work performed by all contractors and subcontractors.

  2. A emergência da empresa virtual e os requisitos para os sistemas de informação The emergency of virtual enterprise and the requirements for information systems

    Directory of Open Access Journals (Sweden)

    Américo L. Azevedo

    2000-12-01

    Full Text Available A vantagem competitiva das empresas passa cada vez mais pelo desenvolvimento de novas estruturas organizacionais, nomeadamente pelo estabelecimento de redes de cooperação com todas as entidades intervenientes na cadeia de fornecimento, e novas metodologias de gestão e planejamento, apoiadas fortemente por tecnologias de informação e de comunicação. Este artigo tem como principal finalidade apresentar o conceito de Empresa Virtual como o paradigma organizacional das empresas emergentes, e explorar a sua estreita relação com as tecnologias de informação e comunicação. Após caracterizar o conceito de Empresa Virtual e de caracterizar o mercado dos sistemas de informação empresarial, é identificado um conjunto de requisitos base para as tecnologias de informação e de comunicação, de suporte a este tipo de organização, nomeadamente para o processo de planejamento e negociação de novas encomendas.Globalisation together with technological advances have dramatically changed the process of value creation at the end of this century. Nowadays, more and more companies are being organised as networks of different units and are therefore becoming global businesses covering multiple manufacturing sites consisting of different shop floors, subcontractors and suppliers. The concept of Virtual Enterprise was born in this environment. The aim of this paper is to present the Virtual Enterprise as a new organisational paradigm and to explore the tight relationship with the information and communication technologies. Our research has shown that traditional enterprise information systems do not suitably cope with some of the new demanding requirements of a distributed and heterogeneous manufacturing environment. In this context, this paper presents a set of requirements that supports this new organisational paradigm.

  3. Kinetic and Modeling Investigation to Provide Design Guidelines for the NREL Dilute-Acid Process Aimed at Total Hydrolysis/Fractionation of Lignocellulosic Biomass: July 1998

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y. Y.; Iyer, P.; Xiang, Q.; Hayes, J.

    2004-08-01

    Following up on previous work, subcontractor investigated three aspects of using NREL ''pretreatment'' technology for total hydrolysis (cellulose as well as hemicellulose) of biomass. Whereas historic hydrolysis of biomass used either dilute acid or concentrated acid technology for hydrolysis of both hemicellulose and cellulose, NREL has been pursuing very dilute acid hydrolysis of hemicellulose followed by enzymatic hydrolysis of cellulose. NREL's countercurrent shrinking-bed reactor design for hemicellulose hydrolysis (pretreatment) has, however, shown promise for total hydrolysis. For the first task, subcontractor developed a mathematical model of the countercurrent shrinking bed reactor operation and, using yellow poplar sawdust as a feedstock, analyzed the effect of: initial solid feeding rate, temperature, acid concentration, acid flow rate, Peclet number (a measure of backmixing in liquid flow), and bed shrinking. For the second task, subcontractor used laboratory trials, with yellow poplar sawdust and 0.07 wt% sulfuric acid at various temperatures, to verify the hydrolysis of cellulose to glucose (desired) and decomposition of glucose (undesired) and determine appropriate parameters for use in kinetic models. Unlike cellulose and hemicellulose, lignins, the third major component of biomass, are not carbohydrates that can be broken down into component sugars. They are, however, aromatic complex amorphous phenolic polymers that can likely be converted into low-molecular weight compounds suitable for production of fuels and chemicals. Oxidative degradation is one pathway for such conversion and hydrogen peroxide would be an attractive reagent for this, as it would leave no residuals. For the third task, subcontractor reacted lignin with hydrogen peroxide under various conditions and analyzed the resulting product mix.

  4. Protecting subcontractor personnel during hazardous waste site characterization

    Energy Technology Data Exchange (ETDEWEB)

    Lankford, B.R.

    1987-01-01

    This paper covers Industrial Hygiene involvement in the Site Characterization Program, focusing on the field oversight responsibilities. It discusses the different types and levels of protective equipment, gives an example of the type of situation that can arise from field characterization efforts, and gives a brief summary of health protection program elements. 3 figs., 3 tabs.

  5. Protecting subcontractor personnel during hazardous waste site characterization

    International Nuclear Information System (INIS)

    Lankford, B.R.

    1987-01-01

    This paper covers Industrial Hygiene involvement in the Site Characterization Program, focusing on the field oversight responsibilities. It discusses the different types and levels of protective equipment, gives an example of the type of situation that can arise from field characterization efforts, and gives a brief summary of health protection program elements. 3 figs., 3 tabs

  6. Synthesis of the IRSN report on the management activities subcontracted by EDF in currently exploited pressurized water reactors. Opinion related to the management of activities subcontracted by EDF in currently exploited PWRs

    International Nuclear Information System (INIS)

    2015-01-01

    A first document proposes a synthesis of an assessment performed by the IRSN which more particularly addressed how the client (EDF) takes up nuclear safety challenges, and its ability to transmit them to the subcontractor and assess the way he takes them up, how the subcontractor adopts these safety issues and translate them into an adapted technical action, the efficiency of information transmission from the subcontractor to the operator, and the way EDF takes the evolution and increase of activities into account in its subcontracting management strategy on the medium and long terms in relationship with modifications generated by recent measures (additional safety assessments, project of lifetime extension). Another document states the opinion of the permanent group of experts for nuclear reactors on these issues, and outlines some specific aspects (unit outage and maintenance planning, risk analysis, intervention preparation and monitoring, return on experience and improvement of the management of subcontracted activities, evolution and increase of activities). Some recommendations are also stated. A third document is a letter sent by the ASN on the same issues which discusses problems and issues related to subcontracting and has been the basis of the IRSN assessment

  7. Construction safety program for the National Ignition Facility, July 30, 1999 (NIF-0001374-OC)

    International Nuclear Information System (INIS)

    Benjamin, D. W.

    1999-01-01

    These rules apply to all LLNL employees, non-LLNL employees (including contract labor, supplemental labor, vendors, personnel matrixed/assigned from other National Laboratories, participating guests, visitors and students) and contractors/subcontractors. The General Rules-Code of Safe Practices shall be used by management to promote accident prevention through indoctrination, safety and health training and on-the-job application. As a condition for contracts award, all contractors and subcontractors and their employees must certify on Form S and H A-l that they have read and understand, or have been briefed and understand, the National Ignition Facility OCIP Project General Rules-Code of Safe Practices. (An interpreter must brief those employees who do not speak or read English fluently.) In addition, all contractors and subcontractors shall adopt a written General Rules-Code of Safe Practices that relates to their operations. The General Rules-Code of Safe Practices must be posted at a conspicuous location at the job site office or be provided to each supervisory employee who shall have it readily available. Copies of the General Rules-Code of Safe Practices can also be included in employee safety pamphlets

  8. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993

    International Nuclear Information System (INIS)

    1993-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized

  9. Modular Electric Vehicle Program (MEVP). Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The Modular Electric Vehicle Program (MEVP) was an EV propulsion system development program in which the technical effort was contracted by DOE to Ford Motor Company. The General Electric Company was a major subcontractor to Ford for the development of the electric subsystem. Sundstrand Power Systems was also a subcontractor to Ford, providing a modified gas turbine engine APU for emissions and performance testing as well as a preliminary design and producibility study for a Gas Turbine-APU for potential use in hybrid/electric vehicles. The four-year research and development effort was cost-shared between Ford, General Electric, Sundstrand Power Systems and DOE. The contract was awarded in response to Ford`s unsolicited proposal. The program objective was to bring electric vehicle propulsion system technology closer to commercialization by developing subsystem components which can be produced from a common design and accommodate a wide range of vehicles; i.e., modularize the components. This concept would enable industry to introduce electric vehicles into the marketplace sooner than would be accomplished via traditional designs in that the economies of mass production could be realized across a spectrum of product offerings. This would eliminate the need to dedicate the design and capital investment to a limited volume product offering which would increase consumer cost and/or lengthen the time required to realize a return on the investment.

  10. 105-N Basin sediment removal subcontract acquisition strategy plan

    International Nuclear Information System (INIS)

    Wilsey, D.J.

    1997-01-01

    The 105-N Basin Sediment Removal Subcontract Acquisition Strategy Plan provides a detailed set of actions to specify and procure services and equipment for removal of approximately 400 ft 3 (wet) of radioactive sediment. The plan outlines a cost-effective approach to remove this sediment safely and within an aggressive schedule. This 105-N Basin Sediment Removal Strategy Plan includes the following key elements: a current vendor survey of capabilities and interest in this type of work, confirming that qualified, competitive sources are available, and in the time frame required; a systematic review of the various options for sediment disposal in enough detail to exhaustively uncover pros and cons of each approach; use of a workshop approach to assess different ways to accomplish the work and ensure the disposal options considered are cost and schedule effective; integration of the complicated sampling and characterization process, which is essential to successful execution of the procurement scheme; review of the various subcontracting options to maximize the use of existing technology, existing equipment, and specialized expertise; detailed early planning and strategizing for early identification of problems that can be solved early before they become restraints or potential added costs; tailored design schedule to cover three alternate approaches so that sample characterization will not delay engineering preparation for disposal; support required from various organizations onsite as well as subcontractors, well in advance of the need for that support, improving availability of the proper personnel to support schedule and cost objectives; and provides the possible opportunity to process the sediment in the valve pit and pump pit through this same subcontractor's process

  11. The Mirror Fusion Test Facility cryogenic system: Performance, management approach, and present equipment status

    International Nuclear Information System (INIS)

    Slack, D.S.; Chronis, W.C.

    1987-01-01

    The cryogenic system for the Mirror Fusion Test Facility (MFTF) is a 14-kW, 4.35-K helium refrigeration system that proved to be highly successful and cost-effective. All operating objectives were met, while remaining within a few percent of initial cost and schedule plans. The management approach used in MFTF allowed decisions to be made quickly and effectively, and it helped keep costs down. Manpower levels, extent and type of industrial participation, key aspects of subcontractor specifications, and subcontractor interactions are reviewed, as well as highlights of the system tests, operation, and present equipment status. Organizations planning large, high-technology systems may benefit from this experience with the MFTF cryogenic system

  12. 48 CFR 952.250-70 - Nuclear hazards indemnity agreement.

    Science.gov (United States)

    2010-10-01

    ... any subcontractor or suppliers thereto) for activities associated with Princeton Plasma Physics... language, for those contracts: “() This indemnity agreement shall be applicable with respect to nuclear...

  13. Reconfigurable EVA Radio with Built-In Navigation Capability, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Intelligent Automation, Inc. and its sub-contractor, Purdue University, propose to develop a power-efficient miniaturized reconfigurable EVA radio system with...

  14. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  15. 77 FR 44045 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-60; Introduction

    Science.gov (United States)

    2012-07-26

    ... the United States Defense Advanced Research Projects Agency (DARPA) to the list of agencies that have... taxation of Government cost-reimbursement contracts when contractors and their subcontractors purchase...

  16. 77 FR 22312 - Access by EPA Contractors to Confidential Business Information Related to the Greenhouse Gas...

    Science.gov (United States)

    2012-04-13

    ... you used. Provide specific examples to illustrate your concerns and suggest alternatives. Explain your... International subcontractors: Abt Associates, 55 Wheeler Street, Cambridge, MA 02138-1168; AMEC, 4021 Stirrup...

  17. 48 CFR 49.108-3 - Settlement procedure.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-3 Settlement procedure. (a) Contractors shall settle with subcontractors in general conformity with the policies and principles relating to settlement...

  18. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  19. A Thin Film Transistor Based Ultrasonic Sensor for Aircraft Integrity Monitoring, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Intelligent Automation, Incorporated (IAI) and its subcontractor, Penn State U., propose a novel system to detect damage in aircraft structures. The system combines...

  20. Additively Manufactured Ceramic Rocket Engine Components

    Data.gov (United States)

    National Aeronautics and Space Administration — HRL Laboratories, LLC, with Vector Space Systems (VSS) as subcontractor, has a 24-month effort to develop additive manufacturing technology for reinforced ceramic...

  1. Development of Advanced Anti-Reflection Coatings for High Performance Solar Energy Applications, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — MicroLink and its subcontractor Magnolia Solar will develop and demonstrate advanced anti-reflection coating (ARC) designs that will provide a better broadband and...

  2. Environmental Management Performance Report April 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  3. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information

  4. WAYS TO IMPROVE ORGANIZATIONAL EFFICIENCY OF TERRITORIAL DEVELOPMENT AND POST-CONFLICT STABILIZATION IN UKRAINE

    Directory of Open Access Journals (Sweden)

    Pavlo Muzyka

    2016-11-01

    Full Text Available The purpose of the paper is to advise to optimization improvement pathways in territorial development and post-conflict stabilization in Ukraine that currently undergoes change from the «firefighting» real-time operational mode to the routine bureaucratic mode. The major challenges include the resolutions of deficient operational models such as: forgetting, chemical dependency of management, inability to make decisions, reluctance to start a dialogue, «cut-off» solutions and some others. Methodology. A desk and in-depth study is carried out of several national territorial stabilization programs dealing with the government that ensure infrastructural support to post-conflict regions and communities in the East of Ukraine. It is studied how the programs are managed by the controversy of the results-based and process-based approaches (2015-2016 data via NGOs and subcontractors. Improving stabilization tools, it leverages transformation of its own systems into a firm yet flexible entity. Results of the research showed that stabilization project systems should seek a balance between the results-based and process-based ends of management, the first focusing on quicker and more flexible lower-level results, and the second building bureaucracy via continuous processes. Practical implementation. Regional subcontractors can improve satisfaction and widen participation by supporting informal initiative from the grassroots level. A good solution to resolve operational conflicts is hiring a helping hand to the administrator – a typical results-based manager who will help follow the harmony to achieve immediate results. Any improvement in the transparency of the system and the formalization of relations between the beneficiary and the subcontractor, shifted in addressing issues at the level below, does not require exclusive access to the principal decision-maker, and would simply and easily be implemented at the technical level of the beneficiary

  5. NURE data collection and evaluation strategies

    International Nuclear Information System (INIS)

    Horton, R.C.

    1977-01-01

    Collection and evaluation strategies used in the National Uranium Resource Evaluation program are described. Hydrogeochemical, airborne radiometric and magnetic, and field geology data are collected in every quadrangle. Topical studies, modeling, and classification and recognition criteria are required for assessment--the final estimate of tons of uranium. The evaluation of quadrangles has been divided into three phases: Phase I, prefield work; Phase II, field work; Phase III, report and map preparation. All evaluators--the U.S. Geological Survey, state surveys, private subcontractors and Bendix--will follow identical procedures. This is not to say that all quadrangles are identical, or that identical techniques will be applied to, or identical data recovered from, each quadrangle

  6. Commercial incineration demonstration

    International Nuclear Information System (INIS)

    Borduin, L.C.; Neuls, A.S.

    1981-01-01

    Low-level radioactive wastes (LLW) generated by nuclear utilities presently are shipped to commercial burial grounds for disposal. Substantially increasing shipping and disposal charges have sparked renewed industry interest in incineration and other advanced volume reduction techniques as potential cost-saving measures. Repeated inquiries from industry sources regarding LLW applicability of the Los Alamos controlled-air incineration (CAI) design led DOE to initiate this commercial demonstration program in FY-1980. The selected program approach to achieving CAI demonstration at a utility site is a DOE sponsored joint effort involving Los Alamos, a nuclear utility, and a liaison subcontractor. Required development tasks and responsibilities of the particpants are described. Target date for project completion is the end of FY-1985

  7. 48 CFR 49.002 - Applicability.

    Science.gov (United States)

    2010-10-01

    ... completed articles or work at the contract price and amounts for the settlement of subcontractor settlement proposals. Credits for retention or other disposal of termination inventory and amounts for advance or...

  8. Non-Toxic, Self-Cleaning Silicone Fouling Release Coatings

    National Research Council Canada - National Science Library

    Cella, James

    1997-01-01

    ... have been identified for preparation of gel wall microencapsulations. A carbinol terminated PDMS and two ablative oils were synthesized for use in the compositions downselected for panel preparation for subcontractor sites...

  9. Strontium-90 Error Discovered in Subcontract Laboratory Spreadsheet. Topical Report

    International Nuclear Information System (INIS)

    Brown, D.D.; Nagel, A.S.

    1999-07-01

    West Valley Demonstration Project health physicists and environment scientists discovered a series of errors in a subcontractor's spreadsheet being used to reduce data as part of their strontium-90 analytical process

  10. 75 FR 34279 - Federal Acquisition Regulation; FAR Case 2009-011, American Recovery and Reinvestment Act of 2009...

    Science.gov (United States)

    2010-06-16

    ... criminal or civil penalties, or if the Federal Acquisition Regulatory Council (FARC) makes a written... contractor and subcontractor records, the FARC has determined that this rule should apply to contracts or...

  11. Affordable Maximum Performance Solar Array for NASA and Commercial Missions, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Deployable Space Systems, Inc. (DSS), and Space Systems Loral as a key subcontractor and potential commercial infusion partner, will focus the proposed SBIR Phase 2...

  12. 24 CFR 570.411 - Joint Community Development Program.

    Science.gov (United States)

    2010-04-01

    ... designated to work on the program, including subcontractors and consultants firmly committed to work on the... activities in a timely fashion, including satisfactory performance in carrying out any previous HUD-assisted...

  13. OrFPGA: An Empirical Performance Tuning Tool for FPGA Designs, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II STTR project, RNET and its subcontractors are proposing to fully develop an empirical performance optimization tool called OrFPGA that efficiently...

  14. 75 FR 13381 - Nondisplacement of Qualified Workers Under Service Contracts

    Science.gov (United States)

    2010-03-19

    ... contractor and its subcontractors shall, except as otherwise provided by the clause, in good faith offer... English and translated versions available in a poster format to contracting agencies via the Internet, in...

  15. 75 FR 5967 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2010-02-05

    ... 651-F WEST 14TH STREET, PANAMA CITY, FL NPA (Subcontractor): Wiregrass Rehabilitation Center, Inc... Contracting Activity: GSA/FSS OFC SUP CTR--PAPER PRODUCTS, NEW YORK, NY Services Service Type/Location: Food...

  16. 48 CFR 22.406-10 - Disposition of disputes concerning construction contract labor standards enforcement.

    Science.gov (United States)

    2010-10-01

    ... officer a complete statement of the reasons for the disagreement with the findings. (d) The contracting...-Bacon Act that constitute a disregard of its obligations to employees or subcontractors under section 3...

  17. 48 CFR 52.217-2 - Cancellation Under Multiyear Contracts.

    Science.gov (United States)

    2010-10-01

    ... precluded anticipated benefits of Contractor or subcontractor learning. (g) The claim shall not include— (1...) This contract may include an Option clause with the period for exercising the option limited to the...

  18. 77 FR 5850 - Notice of Random Assignment Study To Evaluate Workforce Investment Act Adult and Dislocated...

    Science.gov (United States)

    2012-02-06

    ... evaluation, the evaluation team, led by researchers from Mathematica and its subcontractor MDRC, submitted... anyone to services to which they would not have referred them in the absence of the study. The study...

  19. Defense Trade Contractors Engage in Varied International Alliances

    National Research Council Canada - National Science Library

    2000-01-01

    .... Generally, two or more companies form a team by negotiating an agreement to work together to pursue a particular government procurement, with one company acting as the primary contractor and others as subcontractors...

  20. High Temperature, High Frequency Fuel Metering Valve, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Active Signal Technologies and its subcontractor Moog propose to develop a high-frequency actuator driven valve intended to achieve TRL 6 by the end of Phase II....

  1. Millisecond X-ray Star Tracker, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — CrossTrac Engineering, in cooperation with its subcontractors Dr Suneel Sheikh of ASTER Labs, Inc, and Mr Paul Graven of Cateni, Inc, proposes to develop a next...

  2. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.; Manis, L.W.; Barre, W.L.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S ampersand H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures

  3. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    2000-01-01

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cells 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas

  4. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N. [Oak Ridge National Lab., TN (United States); Manis, L.W.; Barre, W.L. [Analysas Corp., Oak Ridge, TN (United States)

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S&H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures.

  5. Environmental Management Performance Report for December 1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  6. Environmental Management Performance Report November 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  7. 48 CFR 2152.070 - Applicable clauses.

    Science.gov (United States)

    2010-10-01

    ...-3Gratuities 52.203-5Covenant against Contingent Fees 52.203-6Restrictions on Subcontractor Sales to the Government 52.203-7Anti-Kickback Procedures 52.203-12Limitation on Payments to Influence Certain Federal...

  8. 48 CFR 1352.209-71 - Limitation of future contracting.

    Science.gov (United States)

    2010-10-01

    ... computer software; and may appear in cost and pricing data or involve classified information. (iv) “System... subcontractor, for the duration of the initial production contract plus [insert a specific period of time or an...

  9. Performance and Economics of Catalytic Glow Plugs and Shields in Direct Injection Natural Gas Engines for the Next Generation Natural Gas Vehicle Program: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J. P.; Bezaire, D.; Sriramulu, S.; Weber, R.

    2003-08-01

    Subcontractor report details work done by TIAX and Westport to test and perform cost analysis for catalytic glow plugs and shields for direct-injection natural gas engines for the Next Generation Natural Gas Vehicle Program.

  10. Assessing Requirements Quality through Requirements Coverage

    Science.gov (United States)

    Rajan, Ajitha; Heimdahl, Mats; Woodham, Kurt

    2008-01-01

    In model-based development, the development effort is centered around a formal description of the proposed software system the model. This model is derived from some high-level requirements describing the expected behavior of the software. For validation and verification purposes, this model can then be subjected to various types of analysis, for example, completeness and consistency analysis [6], model checking [3], theorem proving [1], and test-case generation [4, 7]. This development paradigm is making rapid inroads in certain industries, e.g., automotive, avionics, space applications, and medical technology. This shift towards model-based development naturally leads to changes in the verification and validation (V&V) process. The model validation problem determining that the model accurately captures the customer's high-level requirements has received little attention and the sufficiency of the validation activities has been largely determined through ad-hoc methods. Since the model serves as the central artifact, its correctness with respect to the users needs is absolutely crucial. In our investigation, we attempt to answer the following two questions with respect to validation (1) Are the requirements sufficiently defined for the system? and (2) How well does the model implement the behaviors specified by the requirements? The second question can be addressed using formal verification. Nevertheless, the size and complexity of many industrial systems make formal verification infeasible even if we have a formal model and formalized requirements. Thus, presently, there is no objective way of answering these two questions. To this end, we propose an approach based on testing that, when given a set of formal requirements, explores the relationship between requirements-based structural test-adequacy coverage and model-based structural test-adequacy coverage. The proposed technique uses requirements coverage metrics defined in [9] on formal high-level software

  11. 2012 Suwannee River Water Management District (SRWMD) Lidar: Bradford (FL)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — USGS - Suwannee River Water Management District Contract No.G10PC00093, Task Order No.G12PD00242 Prime Contractor: Digital Aerial Solutions (DAS) Sub-Contractor:...

  12. Whether Foreign Military Sales or Direct Commercial Sales: A Case Study of the UK E-3 AWACS

    Science.gov (United States)

    1990-09-01

    arrangements available include coproduction, licensed production, subcontractor production, overseas investment, technology transfer, and countertrade ...commercial arrangement between the U.S. manufacturer and a foreign entity. Countertrade - Purchase of goods and services from the buyer country as a

  13. 77 FR 75780 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-64; Small Entity Compliance Guide

    Science.gov (United States)

    2012-12-21

    ... analyst whose name appears in the table below in relation to the FAR case. Please cite FAC 2005-64 and the... predecessor contractor and its subcontractors a right of first refusal of employment for positions for which...

  14. Nuclear Magnetic Resonance Trackbed Moisture Sensor System

    Science.gov (United States)

    2018-02-01

    In this initial phase, conducted from March 2015 through December 2016, Vista Clara and its subcontractor Zetica Rail successfully developed and tested a man-portable, non-invasive spot-check nuclear magnetic resonance (NMR) moisture sensor that dire...

  15. Summary Report on Information Technology Integration Activities For project to Enhance NASA Tools for Coastal Managers in the Gulf of Mexico and Support Technology Transfer to Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Gulbransen, Thomas C.

    2009-04-27

    Deliverable to NASA Stennis Space Center summarizing summarizes accomplishments made by Battelle and its subcontractors to integrate NASA's COAST visualization tool with the Noesis search tool developed under the Gulf of Mexico Regional Collaborative project.

  16. Failure Analysis of Nonvolatile Residue (NVR) Analyzer Model SP-1000

    Science.gov (United States)

    Potter, Joseph C.

    2011-01-01

    National Aeronautics and Space Administration (NASA) subcontractor Wiltech contacted the NASA Electrical Lab (NE-L) and requested a failure analysis of a Solvent Purity Meter; model SP-IOOO produced by the VerTis Instrument Company. The meter, used to measure the contaminate in a solvent to determine the relative contamination on spacecraft flight hardware and ground servicing equipment, had been inoperable and in storage for an unknown amount of time. NE-L was asked to troubleshoot the unit and make a determination on what may be required to make the unit operational. Through the use of general troubleshooting processes and the review of a unit in service at the time of analysis, the unit was found to be repairable but would need the replacement of multiple components.

  17. Operational Experience with a Cryogenic Axial-Centrifugal Compressor

    CERN Document Server

    Decker, L; Löhlein, K; Purtschert, W; Ziegler, B L; Lebrun, P; Tavian, L; Brunovsky, I; Tucek, L

    1998-01-01

    The Large Hadron Collider (LHC), presently under construction at CERN, requires large refrigeration capacity at 1.8 K. Compression of gaseous helium at cryogenic temperatures is therefore inevitable. Together with subcontractors, Linde Kryotechnik has developed a prototype machine. This unit is based on a cryogenic axial-centrifugal compressor, running on ceramic ball bearings and driven by a variable-frequency electrical motor operating at ambient temperature. Integrated in a test facility for superconducting magnets the machine has been commissioned without major problems and successfully gone through the acceptance test in autumn 1995. Subsequent steps were initiated to improve efficiency of this prototype. This paper describes operating experience gained so far and reports on measured performance prior to and after constructional modifications.

  18. Le maître d’ouvrage et le contrat de sous-traitance dans les marchés publics de travaux au Cameroun

    Directory of Open Access Journals (Sweden)

    Lesmont Bahoken Valeri

    2015-12-01

    Full Text Available Any subcontracting in public procurement contracts is subject to the prior approval of the Contracting authority. This is a manifestation of excessive powers which holds the administration in public law contracts. Therefore, the public contract is liable to termination as soon as the Contracting authority finds by any means whatsoever subcontracting occult on the work site. However, as soon as subcontracting is allowed, the Contracting authority appears foreign to its implementation, leaving the parties freely fulfill their contractual obligations. The situation of the contractor who is generally a small business or PMI is abandoned to the will of the contracting party of the public person, usually powerful multinationals. The Contracting authority displays a certain neutrality in both the quality of work performed by the contractor in terms of payment of the latter. Contractual freedom seems to have taken precedence here on the powers of control and direction of which is coated the Contracting authority in the execution of public contract, to the detriment of the subcontractor. A reform of the Government Procurement Code and subsequent legislation is needed to better protect the interests of the subcontractor. This article is striving to clarify the relationship Contracting authority -Contractorsubcontractor in works contracts. It demonstrates that the subcontractor weaker party to the contract must be better protected so as to safeguard the contractual solidarism which seems to be based the existence of the outsourcing contract.

  19. Development of a Cummins ISL Natural Gas Engine at 1.4g/bhp-hr NOx + NMHC Using PLUS Technology: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Kamel, M. M.

    2005-07-01

    NREL subcontractor report describes Cummins Westport, Inc.'s development of an 8.9 L natural gas engine (320 hp, 1,000 ft-lb peak torque) with CARB emissions certification of 1.4 g/bhp-hr NOx + NMHC.

  20. RANT Building Upgrade Pre-Proposal Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Melinda Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meadows, Darren W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Rodriguez, Roger R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); MacFarlane, Eric Robert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ortega, Adan Eduardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lopez Escobedo, Gabriela Maria [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-31

    This presentation is designed to provide an overview of the project scope and RFP; discuss interfaces for the construction project; highlight key expectations and deliverables from the subcontractor; and address questions and provide clarification of the project scope.

  1. 32 CFR 701.59 - A brief explanation of the meaning and scope of the nine FOIA exemptions.

    Science.gov (United States)

    2010-07-01

    ... or privileged, such as trade secrets, inventions, discoveries, or other proprietary data...) Scientific and manufacturing processes or developments concerning technical or scientific data or other.... (6) Technical or scientific data developed by a contractor or subcontractor exclusively at private...

  2. DEMONSTRATION OF NO-VOC/NO-HAP WOOD FURNITURE COATING SYSTEM

    Science.gov (United States)

    The United States Environmental Protection Agency has contracted with AeroVironment Environmental Services, Inc. and its subcontractor, Adhesives Coating Co., to develop and demonstrate a no-VOC (volatile organic compound)/no-HAP (hazardous air pollutant) wood furniture coating s...

  3. Radioactive classification of mixed waste -- The need for uniformity

    International Nuclear Information System (INIS)

    Koch, J.D.

    1995-01-01

    In July of 1994, many generators of radioactive and mixed wastes found themselves without a means of disposing of their wastes. This has led these generators to thoroughly search the regulations for guidelines to determine at what level something becomes radioactive. Unfortunately, each regulatory agency, EPA, OSHA, NRC, DOT and DOE have their own requirements such that there are no uniform guidelines to assist in making this determination. Subcontractors to the DOE find themselves further frustrated with each remediation site determining radiation levels and commercial treatment, storage and disposal facilities doing the same. This paper examines the need for the uniform classification of radioactive material. It will review past attempts of regulatory agencies to set minimum levels and the current regulatory climate. The paper will also discuss the experience of Quanterra Environmental Services in dealing with the changes in disposal options due to the closure of low-level radioactive disposal facilities to outside compact states, and the impact of the different regulatory requirements

  4. External attachment of titanium sheathed thermocouples to zirconium nuclear fuel rods for the LOFT reactor

    International Nuclear Information System (INIS)

    Welty, R.K.

    1980-01-01

    The Exxon Nuclear Company, Inc., acting as a Subcontractor to EG and G Idaho Inc., Idaho National Engineering Laboratory, Idaho Falls, Idaho, has developed a welding process to attach titanium sheathed thermocouples to the outside of the zircaloy clad fuel rods. The fuel rods and thermocouples are used to test simulated loss-of-coolant accident (LOCA) conditions in a pressurized water reactor (LOFT Reactor, Idaho National Laboratory). A laser beam was selected as the optimum welding process because of the extremely high energy input per unit volume that can be achieved allowing local fusion of a small area irrespective of the difference in material thickness to be joined. A commercial pulsed laser and energy control system was installed along with specialized welding fixtures. Laser room facility requirements and tolerances were established. Performance qualifications, and detailed welding procedures were also developed. Product performance tests were conducted to assure that engineering design requirements could be met on a production basis

  5. Proceedings of second geopressured geothermal energy conference, Austin, Texas, February 23--25, 1976. Volume IV. Surface technology and resource utilization

    Energy Technology Data Exchange (ETDEWEB)

    Underhill, G.K.; Carlson, R.A.; Clendinning, W.A.

    1976-01-01

    Separate abstracts were prepared for the eight chapters for ERA and one chapter for EAPA. Included in appendices are the reports of two subcontractors on the flashed steam and binary-fluid systems which are discussed at length in the chapters. (MHR)

  6. 76 FR 10360 - Access to Confidential Business Information by Guident Technologies Inc. and Its Identified...

    Science.gov (United States)

    2011-02-24

    ... Business Information by Guident Technologies Inc. and Its Identified Subcontractors AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA has authorized its contractor, Guident Technologies... information may be claimed or determined to be Confidential Business Information (CBI). DATES: Access to the...

  7. Automatic Generation of Assembly Sequence for the Planning of Outfitting Processes in Shipbuilding

    NARCIS (Netherlands)

    Wei, Y.

    2012-01-01

    The most important characteristics of the outfitting processes in shipbuilding are: 1. The processes involve many interferences between yard and different subcontractors. In recent years, the use of outsourcing and subcontracting has become a widespread strategy of western shipyards. There exists

  8. The DISAM Journal of International Security Assistance Management. Volume 24, Number 2, Winter 2001-2002

    Science.gov (United States)

    2002-01-01

    Regulations. In defense trade, offsets include mandatory co-production, licensed production, subcontractor production, technology transfer, countertrade ...investment or countertrade ’ (“Offsets In Defense Trade”, DISAM Journal, 20:2, p. 67). Kremer and Sain agree with these categories of offsets (Kremer

  9. 48 CFR 31.205-33 - Professional and consultant service costs.

    Science.gov (United States)

    2010-10-01

    ... contractor. Examples include those services acquired by contractors or subcontractors in order to enhance..., training, or direct assistance, such as studies, analyses, evaluations, liaison with Government officials..., or otherwise resulting in violation of any statute or regulation prohibiting improper business...

  10. 75 FR 57768 - Access to Confidential Business Information by Eastern Research Group and Its Identified...

    Science.gov (United States)

    2010-09-22

    ... Business Information by Eastern Research Group and Its Identified Subcontractor AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA has authorized its contractor, Eastern Research Group... the information may be claimed or determined to be Confidential Business Information (CBI). DATES...

  11. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  12. 77 FR 76028 - Access to Confidential Business Information by Science Applications International Corporation and...

    Science.gov (United States)

    2012-12-26

    ... Business Information by Science Applications International Corporation and Its Identified Subcontractor...: EPA has authorized its contractor, Science Applications International Corporation (SAIC) of McLean, VA... information may be claimed or determined to be Confidential Business Information (CBI). DATES: Access to the...

  13. Development of Hydrogen Education Programs for Government Officials

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, Shannon [South Carolina Hydrogen and Fuel Cell Alliance, Columbia, SC (United States); Keller, Russ [Advanced Technology International, Cedarburg, WI (United States)

    2016-03-08

    1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site

  14. Domestic policy consequences of new implementation models. Consequences for industrial niches; Industripolitiske konsekvenser av nye gjennomfoeringsmodeller. Konsekvenser for nisjebedriftene

    Energy Technology Data Exchange (ETDEWEB)

    Johannessen, T.

    1995-12-31

    The paper relates to the consequences of domestic policy with the focus on new implementation models used for cost reduction of offshore development projects in Norway. The paper puts the attention to the consequences from implementation models on industrial niches (subcontractors)

  15. 48 CFR 1552.209-70 - Organizational conflict of interest notification.

    Science.gov (United States)

    2010-10-01

    ... Clauses 1552.209-70 Organizational conflict of interest notification. As prescribed in 1509.507-1(b) insert the following solicitation provision in all solicitations. Organizational Conflict of Interest... subcontractor) may have a potential organizational conflict of interest. (b) Prospective Contractors should...

  16. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  17. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  18. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  19. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  20. Proceedings of the Subcontractors' Review Meeting: Aquatic Species Program

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    The Aquatic Species Program (ASP) addresses the utilization of plant biomass that naturally occurs in wetland or submerged areas. Processes are being developed through this program to make use of such aquatic species, capitalizing on their inherent capacity for rapid growth as well as their extraordinary chemical compositions.

  1. OCRWM international procedures

    International Nuclear Information System (INIS)

    1986-03-01

    These international procedures provide guidance and assistance for the Office of Civilian Radioactive Waste Management (OCRWM) and for OCRWM Project Offices, contractors and subcontractors in conducting international activities. They supplement the relevant Department of Energy (DOE) orders (which are referenced), not supplant them

  2. 36 CFR 223.186 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... refers to the geographic area within which logs from any origin have neither been exported nor..., association, or other legal entity and includes any subsidiary, subcontractor, parent company, and business... factors, including but not limited to common ownership, common management, common facilities, and...

  3. 48 CFR 370.401 - Policy.

    Science.gov (United States)

    2010-10-01

    ... PROGRAMS AFFECTING ACQUISITION Acquisitions Involving the Use of Laboratory Animals 370.401 Policy. (a) It... subject to initial and continuing review by an appropriate Institutional Animal Care and Use Committee... of Laboratory Animal Welfare (OLAW), NIH, of each contractor, subcontractor, or cooperating...

  4. 42 CFR 438.230 - Subcontractual relationships and delegation.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Subcontractual relationships and delegation. 438... Improvement Structure and Operation Standards § 438.230 Subcontractual relationships and delegation. (a... delegation, each MCO, PIHP, and PAHP evaluates the prospective subcontractor's ability to perform the...

  5. 77 FR 58383 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Science.gov (United States)

    2012-09-20

    ... contractor and subcontractor, Thomson Reuters and Social & Scientific Systems, Inc., pursuant to AHRQ's... disk (or any other media used in the future). AHRQ policy and current agreements with Statewide Data... place. Estimated Annual Respondent Burden Exhibit 1 shows the estimated annualized burden associated...

  6. 1987 Oak Ridge model conference: Proceedings: Volume 3, Health and safety

    International Nuclear Information System (INIS)

    1987-01-01

    See the abstract for Volume I for general information on the conference. Topics discussed in Volume III include the use of models in handling hazardous materials, communication at waste sites, asbestos, regulatory decisions, emergency planning, training programs, occupational hazards, and protection of subcontractors

  7. 48 CFR 252.227-7019 - Validation of asserted restrictions-Computer software.

    Science.gov (United States)

    2010-10-01

    ..., creates or implies privity of contract between the Government and the Contractor's subcontractors or... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.227-7019 Validation of asserted restrictions..., unless otherwise specifically indicated, the term “Contractor” means the Contractor and its...

  8. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  9. 48 CFR 652.236-70 - Accident Prevention.

    Science.gov (United States)

    2010-10-01

    ..., toxic, reactive or unstable, or any operations which creates any kind of contamination inside an... be responsible for its subcontractors' compliance with this clause. (d) Written program. Before... develop a mutual understanding relative to administration of the overall safety program. (e) Notification...

  10. 29 CFR 471.13 - Under what circumstances, and how, will enforcement proceedings under Executive Order 13496 be...

    Science.gov (United States)

    2010-07-01

    ... Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement; Compliance Review and Complaint Procedures § 471.13 Under...

  11. 29 CFR 471.10 - How will the Department determine whether a contractor is in compliance with Executive Order...

    Science.gov (United States)

    2010-07-01

    ... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement; Compliance Review and Complaint Procedures § 471.10...

  12. 29 CFR 471.2 - What employee notice clause must be included in Government contracts?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Definitions..., clarification of existing law by the courts or the National Labor Relations Board, or other circumstances make...

  13. 29 CFR 471.12 - What are the procedures to be followed when a violation is found during a complaint investigation...

    Science.gov (United States)

    2010-07-01

    ... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement; Compliance Review and Complaint Procedures § 471.12...

  14. 23 CFR 230.413 - Review reports.

    Science.gov (United States)

    2010-04-01

    ... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... documentary evidence. (4) The compliance review report shall contain at least the following information. 1... from the General Accounting Office, Office of Management and Budget, Senate Subcommittee on Public...

  15. 3 CFR 13495 - Executive Order 13495 of January 30, 2009. Nondisplacement of Qualified Workers Under Service...

    Science.gov (United States)

    2010-01-01

    ... contractor and its subcontractors shall, except as otherwise provided herein, in good faith offer those... by law, regulations in the Federal Acquisition Regulation to provide for inclusion of the contract.... Nondisplacement of Qualified Workers Under Service Contracts 13495 Order 13495 Presidential Documents Executive...

  16. 10 CFR 950.14 - Standby Support Contract: Covered events, exclusions, covered delay and covered cost provisions.

    Science.gov (United States)

    2010-01-01

    ... construction problems; (ii) Labor-management disputes; (iii) The sponsor's failure to perform inspections... of the advanced nuclear facility. (3) Normal business risks, including but not limited to the...) Supplier or subcontractor delays in performance; (vi) Litigation, whether initiated by the sponsor or...

  17. Smart Grid Cybersecurity: Job Performance Model Report

    Energy Technology Data Exchange (ETDEWEB)

    O' Neil, Lori Ross; Assante, Michael; Tobey, David

    2012-08-01

    This is the project report to DOE OE-30 for the completion of Phase 1 of a 3 phase report. This report outlines the work done to develop a smart grid cybersecurity certification. This work is being done with the subcontractor NBISE.

  18. Outsourcing and scheduling for a two-machine flow shop with release times

    Science.gov (United States)

    Ahmadizar, Fardin; Amiri, Zeinab

    2018-03-01

    This article addresses a two-machine flow shop scheduling problem where jobs are released intermittently and outsourcing is allowed. The first operations of outsourced jobs are processed by the first subcontractor, they are transported in batches to the second subcontractor for processing their second operations, and finally they are transported back to the manufacturer. The objective is to select a subset of jobs to be outsourced, to schedule both the in-house and the outsourced jobs, and to determine a transportation plan for the outsourced jobs so as to minimize the sum of the makespan and the outsourcing and transportation costs. Two mathematical models of the problem and several necessary optimality conditions are presented. A solution approach is then proposed by incorporating the dominance properties with an ant colony algorithm. Finally, computational experiments are conducted to evaluate the performance of the models and solution approach.

  19. Nuclear Criticality Safety Organization qualification program. Revision 4

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1997-01-01

    The Nuclear Criticality Safety Organization (NCSO) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSO technical and managerial qualification as required by the Y-12 Training Implementation Matrix (TIM). It is implemented through a combination of LMES plant-wide training courses and professional nuclear criticality safety training provided within the organization. This Qualification Program is applicable to technical and managerial NCSO personnel, including temporary personnel, sub-contractors and/or LMES employees on loan to the NCSO, who perform the NCS tasks or serve NCS-related positions as defined in sections 5 and 6 of this program

  20. Areva - Nuclear Safety Policy 2013-2016

    International Nuclear Information System (INIS)

    2013-03-01

    The objectives of Areva's Nuclear Safety Policy cover three areas: 1 - Safety of facilities: - Establish a group wide process to maintain the regulatory compliance of facilities and to ensure the execution of improvements required by periodic reviews of safety. - Put in place proactive measures to reduce source terms present in facilities, and in particular with regard to fire, operational waste and legacy waste on AREVA sites. - Ensure the performance of arrangements and activities central to risk prevention, in particular in the areas of containment, criticality safety and radiological protection through compliance with the associated safety requirements. - Strengthen the emergency planning arrangements to be implemented in case of accidents and test these through regular exercises. 2 - Operational Safety: - Develop and verify the level of safety culture of our staff and subcontractors and increase the presence of operational managers on the ground. - Improve the requirements and responsibilities within documentation associated with operations and interventions on the basis of a significant involvement of our staff and subcontractors. - Implement robust and formal risk prevention processes to manage temporary or transitional situations, uncommon situations, or specific risks, including but not limited to parallel activities, administrative lockout/tag-out, working with naked flames, gamma radiation, work in a radioactive environment. - Integrate human and organizational factors (HOF) in the analysis of safety-related modifications of facilities; undertake detailed reviews of the causes of all significant events inside the group and improve the communication and implementation of operating experience within all group entities. - 3 Safety Management: - Maintain an organization based on clear principles of shared responsibility and delegation of authority, and have in place a robust process to assess the impact on safety of any organizational change. - Strengthen

  1. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  2. 48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Science.gov (United States)

    2010-10-01

    ... contractor and of each subcontractor (see 49.108) includes performance of accounting reviews and any... accounting review procedures and performance, and to make appropriate comments and recommendations to the TCO... shall develop requested information and may make any further accounting reviews it considers appropriate...

  3. 78 FR 48467 - CompuCom Systems, Inc., Tewksbury, Massachusetts; CompuCom Systems, Inc. Houston, Texas; Amended...

    Science.gov (United States)

    2013-08-08

    ... information technology outsourcing services. Specifically, the workers are subcontractors working in a call... workers of the subject firm. New information shows that the Houston, Texas and Tewksbury, Massachusetts locations of CompuCom Systems are engaged in activities related to the supply of information technology...

  4. 49 CFR 1570.13 - False statements regarding security background checks by public transportation agency or railroad...

    Science.gov (United States)

    2010-10-01

    ... checks by public transportation agency or railroad carrier. 1570.13 Section 1570.13 Transportation Other... regarding security background checks by public transportation agency or railroad carrier. (a) Scope. This... employee of a public transportation agency or a contractor or subcontractor of a public transportation...

  5. 78 FR 9918 - Protections Against Trafficking In Persons In Federal Contracts

    Science.gov (United States)

    2013-02-12

    ... trafficking safeguards provided by E.O. 13627 and the ETGCA will increase stability, productivity, and... regarding Government employees and contractor personnel engaging in any form of this criminal behavior. FAR... contractors and subcontractors to notify government employees of trafficking violations and puts parties on...

  6. BASELINE DESIGN/ECONOMICS FOR ADVANCED FISCHER-TROPSCH TECHNOLOGY; FINAL

    International Nuclear Information System (INIS)

    None

    1998-01-01

    Bechtel, along with Amoco as the main subcontractor, developed a Baseline design, two alternative designs, and computer process simulation models for indirect coal liquefaction based on advanced Fischer-Tropsch (F-T) technology for the U. S. Department of Energy's (DOE's) Federal Energy Technology Center (FETC)

  7. Human Repsonse to Sonic Booms: A Research Program Plan

    Science.gov (United States)

    1970-02-01

    sociological data c The additional research certification of supers workable units. Our re ties and the appropriat The recommended researc ence and...Members of the review committee should be reputable authorities in their specialties. The sampling subcontractor can be a market - ing research or

  8. 75 FR 76479 - Notice of Proposed Information Collection for Public Comment: County Data Record Project

    Science.gov (United States)

    2010-12-08

    ... forms of information technology; e.g., permitting electronic submission of responses. Title of Proposal... Associates Inc. and its subcontractors, Fairview Industries and Smart Data Strategies, is conducting a... activities. First, this database will give HUD an ability to track home sales, foreclosures and tax...

  9. 76 FR 57674 - Defense Federal Acquisition Regulation Supplement; Award Fee Reduction or Denial for Health or...

    Science.gov (United States)

    2011-09-16

    ... the contractor's or subcontractor's gross negligence or with reckless disregard for the safety of... that jeopardize the health and safety of Government personnel, through gross negligence or reckless... injury through gross negligence or with reckless disregard for the safety of such personnel, this final...

  10. 78 FR 45464 - Broadband Data Improvement Act; Eligible Entities Aggregate Form 477 Data

    Science.gov (United States)

    2013-07-29

    ...) containing an express commitment to protect the data in this fashion. 33. Procedures for Obtaining Access to... employees of the eligible entity; (2) outside contractors, subcontractors, consultants or experts retained for the purpose of assisting eligible entities, provided that such outside consultants are not...

  11. 29 CFR 471.15 - Under what circumstances must a contractor be provided the opportunity for a hearing?

    Science.gov (United States)

    2010-07-01

    ...-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances must a contractor be provided the...

  12. 29 CFR 471.16 - Under what circumstances may a contractor be reinstated?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances may a contractor be reinstated...

  13. 29 CFR 471.21 - Who will make rulings and interpretations under Executive Order 13496 and this part?

    Science.gov (United States)

    2010-07-01

    ...-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR... 29 Labor 2 2010-07-01 2010-07-01 false Who will make rulings and interpretations under Executive...

  14. 29 CFR 471.3 - What exceptions apply and what exemptions are available?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Definitions... 29 Labor 2 2010-07-01 2010-07-01 false What exceptions apply and what exemptions are available...

  15. 29 CFR 471.20 - What authority under this part or Executive Order 13496 may the Secretary delegate, and under...

    Science.gov (United States)

    2010-07-01

    ... to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Ancillary Matters § 471.20 What authority under this part or Executive...

  16. 29 CFR 471.14 - What sanctions and penalties may be imposed for noncompliance, and what procedures will the...

    Science.gov (United States)

    2010-07-01

    ... LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement; Compliance Review... 29 Labor 2 2010-07-01 2010-07-01 false What sanctions and penalties may be imposed for...

  17. Ceramic stationary gas turbine development. Final report, Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    This report summarizes work performed by Solar Turbines Inc. and its subcontractors during the period September 25, 1992 through April 30, 1993. The objective of the work is to improve the performance of stationary gas turbines in cogeneration through implementation of selected ceramic components.

  18. 20 CFR 438.105 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... private sector. Recipient includes all contractors, subcontractors at any tier, and subgrantees at any... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Definitions. 438.105 Section 438.105 Employees' Benefits SOCIAL SECURITY ADMINISTRATION RESTRICTIONS ON LOBBYING General § 438.105 Definitions...

  19. 20 CFR 638.808 - Center financial management and reporting.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Center financial management and reporting... § 638.808 Center financial management and reporting. The Job Corps Director shall establish procedures to ensure that each center operator and each subcontractor maintain a financial management system...

  20. Ensuring comparability of data generated by multiple analytical laboratories for environmental decision making at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Sutton, C.; Campbell, B.A.; Danahy, R.J.; Dugan, T.A.; Tomlinson, F.K.

    1994-01-01

    The Fernald Environmental Management Project is a US Department of Energy (DOE)-owned facility located 17 miles northwest of Cincinnati, Ohio. From 1952 until 1989, the Fernald site provided high-purity uranium metal products to support US defense programs. In 1989 the mission of Fernald changed from one of uranium production to one of environmental restoration. At Fernald, multiple functional programs require analytical data. Inorganic and organic data for these programs are currently generated by seven laboratories, while radiochemical data are being obtained from six laboratories. Quality Assurance (QA) and Quality Control (QC) programs have been established to help ensure comparability of data generated by multiple laboratories at different times. The quality assurance program for organic and inorganic measurements specifies which analytical methodologies and sample preparation procedures are to be used based on analyte class, sample matrix, and data quality requirements. In contrast, performance specifications have been established for radiochemical analyses. A blind performance evaluation program for all laboratories, both on-site and subcontracted commercial laboratories, provides continuous feedback on data quality. The necessity for subcontractor laboratories to participate in the performance evaluation program is a contractual requirement. Similarly, subcontract laboratories are contractually required to generate data which meet radiochemical performance specifications. The Fernald on-site laboratory must also fulfill these requirements

  1. Commercial Decommissioning at DOE's Rocky Flats

    International Nuclear Information System (INIS)

    Freiboth, C.; Sandlin, N.; Schubert, A.; Hansen, S.

    2002-01-01

    Due in large part to the number of nuclear facilities that make up the DOE complex, DOE-EM work has historically been paperwork intensive and driven by extensive regulations. Requirements for non-nuclear facilities are often grouped with those of nuclear facilities, driving up costs. Kaiser-Hill was interested in applying a commercial model to demolition of these facilities and wanted to apply necessary and sufficient standards to the work activities, but avoid applying unnecessary requirements. Faced with demolishing hundreds of uncontaminated or non-radiologically contaminated facilities, Kaiser-Hill has developed a subcontracting strategy to drastically reduce the cost of demolishing these facilities at Rocky Flats. Aiming to tailor the demolition approach of such facilities to more closely follow commercial practices, Kaiser-Hill recently released a Request for Proposals (RFP) for the demolition of the site's former central administration facility. The RFP significantly reduced requirements for compliance with specific DOE directives. Instead, the RFP required subcontractors to comply with health and safety requirements commonly found in the demolition of similar facilities in a commercial setting. This resulted in a number of bids from companies who have normally not bid on DOE work previously and at a reduced cost over previous approaches. This paper will discuss the details of this subcontracting strategy

  2. Software requirements

    CERN Document Server

    Wiegers, Karl E

    2003-01-01

    Without formal, verifiable software requirements-and an effective system for managing them-the programs that developers think they've agreed to build often will not be the same products their customers are expecting. In SOFTWARE REQUIREMENTS, Second Edition, requirements engineering authority Karl Wiegers amplifies the best practices presented in his original award-winning text?now a mainstay for anyone participating in the software development process. In this book, you'll discover effective techniques for managing the requirements engineering process all the way through the development cy

  3. Secure information sharing in digital supply chains

    NARCIS (Netherlands)

    Bhargava, B.; Ranchal, R.; Ben Othmane, L.; Kalra, B.M.

    2013-01-01

    Modern organizations interact with their partners through digital supply chain business processes for producing and delivering products and services to consumers. A partner in this supply chain can be a sub-contractor to whom work is outsourced. Each partner in a supply chain uses data, generates

  4. 77 FR 38292 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Science.gov (United States)

    2012-06-27

    ... contractor and subcontractor, Thomson Reuters and Social & Scientific Systems, Inc., pursuant to AHRQ's... application process. Contact information is used for shipping the data on disk (or any other media used in the... Annual Respondent Burden Exhibit 1 shows the estimated annualized burden associated with the applicants...

  5. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  6. 48 CFR 1819.7102 - General.

    Science.gov (United States)

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Rural Area Small Business Plan 1819.7102 General. Pursuant to Public Law 100-590, NASA established a Rural Area Business Enterprise Development Plan, including methods for encouraging prime and subcontractors to use small business concerns located in rural areas as...

  7. 77 FR 16651 - National Defense Resources Preparedness

    Science.gov (United States)

    2012-03-22

    ... commercial sectors for research and development and for acquisition of materials, services, components, and... by a small business supplier or subcontractor in accordance with section 108(b)(2) of the Act, 50 U.S... the National Labor Relations Board, the Federal Labor Relations Authority, the National Mediation...

  8. NDE of stainless steel and on-line leak monitoring of LWRs. Annual report, October 1984-September 1985. Volume 2

    International Nuclear Information System (INIS)

    Kupperman, D.S.; Claytor, T.N.; Mathieson, T.; Prine, D.W.

    1986-02-01

    This progress report summarizes work performed by the Argonne National Laboratory and GARD, Inc. (Division of Chamberlain Mfg. Corp.) as subcontractor on NDE of stainless steel and on-line leak monitoring of LWRs during the 12 months from October 1984 to September 1985. 15 refs., 36 figs

  9. 75 FR 81908 - Defense Federal Acquisition Regulation Supplement; Organizational Conflicts of Interest in Major...

    Science.gov (United States)

    2010-12-29

    ... strategy, the apparently successful offeror will be able to provide objective and unbiased advice. Refining the definition of ``major subcontractor'' to include upper and lower limits on application of the... pricing data threshold would not be considered a major subcontract; and [cir] A subcontract equal to or...

  10. 42 CFR 420.303 - HHS criteria for requesting books, documents, and records.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false HHS criteria for requesting books, documents, and... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM PROGRAM INTEGRITY: MEDICARE Access to Books, Documents, and Records of Subcontractors § 420.303 HHS criteria for requesting books, documents, and records...

  11. 48 CFR 52.246-21 - Warranty of Construction.

    Science.gov (United States)

    2010-10-01

    ... restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty.... (g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or... executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and (3...

  12. 48 CFR 252.227-7013 - Rights in technical data-Noncommercial items.

    Science.gov (United States)

    2010-10-01

    ... management information. (15) Unlimited rights means rights to use, modify, reproduce, perform, display...) In no event shall the Contractor use its obligation to recognize and protect subcontractor or... designs. For a vessel design (including a vessel design embodied in a useful article) that is developed or...

  13. 29 CFR 471.11 - What are the procedures for filing and processing a complaint?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement... 29 Labor 2 2010-07-01 2010-07-01 false What are the procedures for filing and processing a...

  14. 75 FR 77727 - Federal Acquisition Regulation; HUBZone Program Revisions

    Science.gov (United States)

    2010-12-13

    ... officer. Response: If the contracting officer is notified of possible contractor violations of Federal law...) * * * * * (d)(1) Contractors acting in good faith may rely on written representations by their subcontractors... award of a HUBZone contract, a HUBZone small business concern must be a HUBZone small business concern...

  15. 48 CFR 22.401 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... Section 22.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC...). Laborers or mechanics—(1) Means— (i) Workers, utilized by a contractor or subcontractor at any tier, whose duties are manual or physical in nature (including those workers who use tools or who are performing the...

  16. Shop Floor-Level Control of Manufacturing Companies: An Interview Study in Finland

    Directory of Open Access Journals (Sweden)

    Tokola Henri

    2015-02-01

    Full Text Available This paper publishes the results of interviews regarding shop-floor-level control of 18 Finnish manufacturing companies. The interviews had 17 open questions relating to demand characteristics, shop floor-level control issues, production flexibility, inventory control, and potential development areas. In order to get insights from the interviews, this paper analyses the answers from the interviews and categorises them into typical answers. The companies that were interviewed are also categorised as small companies with their own end products, subcontractors, or large companies with their own end products, and the emphasis of the analysis is on how companies differ in their shop floor-level control. The results show that different types of companies have different characteristics. Small companies are characterised by constant workflow, seasonal trends in demand, and the use of forecasts. Subcontractors have great daily variation in their demand and processing times. Large companies tend to focus on inventory issues.

  17. The nexus between OSH and subcontracting.

    Science.gov (United States)

    Nunes, Isabel L

    2012-01-01

    Subcontracting of specialized functions to external companies (e.g. cleaning or maintenance) is actually very common within several industries. These external companies' are called contractors and their contracting is often designated as outsourcing. Frequently contractors involve other companies (the sub-contractors) to assist them in fulfilling the contract, resulting in a complex chain of organizations focused on interchange of work - the contracting chain. Therefore in the same work site can coexist workers form the client-company and workers from the contractors and/or subcontractors. Since contractors perform their job in client's facilities, they can be exposed to hazards that are unknown to them. On other hand, workers of the client company can also be exposed to hazardous situations derived from the work performed by the contractors. The paper discusses how adequate occupational safety and health conditions can be assured when dealing with this kind of dynamic labor networks. Two case-studies and several examples coming from international literature will be presented.

  18. Anticipating requirements changes-using futurology in requirements elicitation

    OpenAIRE

    Pimentel, João Henrique; Santos, Emanuel; Castro, Jaelson; Franch Gutiérrez, Javier

    2012-01-01

    It is well known that requirements changes in a later phase of software developments is a major source of software defects and costs. Thus, the need of techniques to control or reduce the amount of changes during software development projects. The authors advocate the use of foresight methods as a valuable input to requirements elicitation, with the potential to decrease the number of changes that would be required after deployment, by anticipating them. In this paper, the authors define a pr...

  19. 32 CFR 518.13 - FOIA exemptions.

    Science.gov (United States)

    2010-07-01

    ..., discoveries, or other proprietary data. Additionally, when the provisions of 10 U.S.C. 2305(g) and 41 U.S.C...; (5) Scientific and manufacturing processes or developments concerning technical or scientific data or... in progress; (6) Technical or scientific data developed by a contractor or subcontractor exclusively...

  20. 29 CFR 1925.2 - Safety and health standards.

    Science.gov (United States)

    2010-07-01

    .... Every contractor and subcontractor shall comply with the safety and health standards published in 41 CFR... 29 Labor 7 2010-07-01 2010-07-01 false Safety and health standards. 1925.2 Section 1925.2 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR...

  1. 10 CFR 76.7 - Employee protection.

    Science.gov (United States)

    2010-01-01

    .... An employee's engagement in protected activities does not automatically render him or her immune from... 10 Energy 2 2010-01-01 2010-01-01 false Employee protection. 76.7 Section 76.7 Energy NUCLEAR... Employee protection. (a) Discrimination by the Corporation, a contractor, or a subcontractor of the...

  2. 48 CFR 52.222-41 - Service Contract Act of 1965.

    Science.gov (United States)

    2010-10-01

    ... agreement or disagreement of the employees' authorized representatives or the employees themselves together... deemed to refer to the subcontractor, except in the term “Government Prime Contractor.” Service employee....S.C. 356, as interpreted in subpart C of 29 CFR part 4. (c) Compensation. (1) Each service employee...

  3. 76 FR 40798 - Antidrug and Alcohol Misuse Prevention Programs for Personnel Engaged in Specified Aviation...

    Science.gov (United States)

    2011-07-12

    ... Machining and N welding of ground support parts for planes. Manufacturing & N precision grinding and testing... directly for an employer, including contractors and subcontractors, is subject to drug and alcohol testing... testing regulations by amending the definition of employee (67 FR 9366, 9377, Feb. 28, 2002). The FAA...

  4. 78 FR 72679 - Submission for OMB Review: Comment Request

    Science.gov (United States)

    2013-12-03

    ... examining the process of implementation in the 17 RPG projects, with a focus on factors shown in the... into a web-based system developed and operated by Mathematica Policy Research and its subcontractors... information for the Regional Partnership Grants to Increase the Well-being of and to Improve Permanency...

  5. 78 FR 50051 - Submission for OMB Review; Comment Request

    Science.gov (United States)

    2013-08-16

    ...[eacute] firms as subcontractors and suppliers; and (3) foster the establishment of long-term business relationships between prot[eacute]g[eacute] firms and major DoD contractors. This Program implements Section 831... recommendations on the proposed information collection should be sent to Ms. Seehra at the Office of Management...

  6. Ghanaian Craft Exporters in the Global Market: Binding and Missing ...

    African Journals Online (AJOL)

    The strong positions of buyers and export agents in the craft value chain enable them to apply sanctions to extract compliance from the exporters whereas the weak position of the export vendors implies the lack of sanctioning authority over the rogue artisan subcontractors. The government's promotion programmes could ...

  7. Evaluation of the Department of Defense Combating Trafficking in Persons Program

    Science.gov (United States)

    2014-06-16

    of forced labor and debt bondage against U.S. contractors in Iraq, and, in 2008, workers for a subcontractor supporting U.S. troops in Iraq rioted...U.S. forces’ involvement in sexual slavery, human trafficking, and debt bondage . Background and Criteria Federal Law In 2000, the President signed

  8. Biomass Support for the China Renewable Energy Law: Final Report, December 2005

    Energy Technology Data Exchange (ETDEWEB)

    2006-10-01

    Final subcontractor report giving an overview of the biomass power generation technologies used in China. Report covers resources, technologies, foreign technologies and resources for comparison purposes, biomass potential in China, and finally government policies in China that support/hinder development of the using biomass in China for power generation.

  9. 42 CFR 420.304 - Procedures for obtaining access to books, documents, and records.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Procedures for obtaining access to books, documents... Books, Documents, and Records of Subcontractors § 420.304 Procedures for obtaining access to books... following elements: (1) Reasonable identification of the books, documents, and records to which access is...

  10. 29 CFR 471.22 - What actions may the Director of OLMS take in the case of intimidation and interference?

    Science.gov (United States)

    2010-07-01

    ...-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR... 29 Labor 2 2010-07-01 2010-07-01 false What actions may the Director of OLMS take in the case of...

  11. 78 FR 70482 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-71; Small Entity Compliance Guide

    Science.gov (United States)

    2013-11-25

    ... World Trade Organization Government Procurement Agreement (WTO GPA). Croatia joined the European Union on July 1, 2013, which is a party to the WTO GPA. Therefore, this rule adds Croatia to the list of... accelerated payments from the Government, to make accelerated payments to small business subcontractors, to...

  12. 7 CFR 3018.105 - Definitions.

    Science.gov (United States)

    2010-01-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 7 Agriculture 15 2010-01-01 2010-01-01 false Definitions. 3018.105 Section 3018.105 Agriculture... AGRICULTURE NEW RESTRICTIONS ON LOBBYING General § 3018.105 Definitions. For purposes of this part: (a) Agency...

  13. 44 CFR 18.105 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Definitions. 18.105 Section... HOMELAND SECURITY GENERAL NEW RESTRICTIONS ON LOBBYING General § 18.105 Definitions. For purposes of this...

  14. 24 CFR 882.518 - Denial of admission and termination of assistance for criminals and alcohol abusers.

    Science.gov (United States)

    2010-04-01

    ..., contractor, subcontractor or agent of the owner who is involved in the owner's housing operations. (2... officer, a landlord, neighbors, social service agency workers and criminal records, which the PHA verified... family under the program if the PHA determines that any member of the household has ever been convicted...

  15. 24 CFR 982.553 - Denial of admission and termination of assistance for criminals and alcohol abusers.

    Science.gov (United States)

    2010-04-01

    ... ASSISTANCE: HOUSING CHOICE VOUCHER PROGRAM Family Obligations; Denial and Termination of Assistance § 982.553... responsibility on behalf of the PHA (including a PHA employee or a PHA contractor, subcontractor or agent). (B... supporting information from such sources as a probation officer, a landlord, neighbors, social service agency...

  16. 48 CFR 1825.1103-70 - Export control.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Export control. 1825.1103...-70 Export control. (a) Background. (1) NASA contractors and subcontractors are subject to U.S. export... 120 through 130, and the Export Administration Regulations (EAR), 15 CFR parts 730 through 799. The...

  17. Legacy material work-off project

    International Nuclear Information System (INIS)

    Sloan, T.J.; Baker, D.H. IV

    1999-01-01

    Los Alamos National Laboratory (LANL) and its subcontractors recently completed a nine-month legacy material clean-up effort. Legacy materials were defined as chemicals, hazardous, non-hazardous, and both hazardous and radioactive (mixed), that no longer served a programmatic use and had no identified individual owner within the Laboratory. Once personnel identified the legacy materials, the items were transferred to Solid Waste Operation's (EM-SWO) control. Upon completing this process, the responsible division-level manager was required to certify that all non-radioactive hazardous and non-hazardous materials and acceptable mixed legacy materials had been identified and transferred to EM-SWO for proper handling or disposal. The major expense in this project was the cost of actual chemical and radiological analysis. This expense was the result of items not having an identified individual owner. The major benefit of this project is that LANL is now in an excellent position to implement its Integrated Safety Management (ISM) Plan, which requires the implementation of safe work practices, including requirements for removing unused items when vacating workspaces. Effective implementation of ISM will go a long way toward ensuring that legacy materials are no longer an issue at the Laboratory

  18. Construction of scales to measure leadership behavior at nuclear power plants. 1

    International Nuclear Information System (INIS)

    Misumi, Jyuji; Yamada, Akira; Shinohara, Shinobu

    1994-01-01

    In order to construct scales to measure leadership behavior of managers and supervisors at nuclear power plants, we prepared questionnaire covering all the leadership behaviors of leaders and then had their subordinates fill out the questionnaire. We selected questionnaire items for use in measuring leadership behaviors, analyzing the responses by means of factor analysis, etc. For the section chiefs, five factors were named, i.e., 'consideration' and 'self-righteousness' that belong to group maintenance behavior and 'thorough dissemination of information', 'specialty, planning' and 'pressure' that belong to goal achievement behavior. For the maintenance subsection chiefs were found seven factors, i.e., 'example setting', 'appropriate handling of work', 'planning', 'rigidity', 'educational guidance' that belong to goal achievement behavior and 'consideration for work' and 'personal consideration' that belong to group maintenance behavior. For maintenance and repair foremen were named six factors, i.e., 'consideration' that belongs to group maintenance behavior and 'specialty, planning', 'reporting, liaison', 'adjustment, rigidity', 'paper work confirmation', and 'example setting' that belong to goal achievement behavior. For subcontractors' field leaders were named seven factors, i.e., 'example setting, specialty and planning', 'careful guidance', 'rigidity', 'observance of rules' and 'paper work handling' that belong to goal achievement behavior and, 'consideration', 'frank communication'. In order to examine the validity of these items, we analyzed relationship between the 'morale'-(satisfaction, etc.) variables of the company's regular employees and subcontractors' employees and their leadership. It was found that the three leadership behavior scales for the section chiefs, maintenance and repair subsection chiefs and subcontractor leaders were very much the same as those found in private sector. (J.P.N.)

  19. High Technology Engineering Services, Inc. fiscal year 1993 and 1994 research and development report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    This document has been prepared by the Professional Staff of High Technology Engineering Services, Inc. (HTES) for fiscal year (FY) 1993. Work was performed for various aspects of mechanical design and analysis, materials development and properties quantification, nuclear environment performance, and engineering program prioritization. The tasks enumerated in the subcontract, attachment B are: 1. Assist in preparation of final R&D report for SDC detector development. 2. Subcontractor shall make contributions to the development of innovative processes for the manufacture of quasi- isotropic, enhanced thermal conductivity compression molded advanced composite materials. 3. Perform finite element analysis as it relates to the Superconducting Super Collider Silicon Tracking System, both mechanical and thermal, of very thin section advanced composite materials. 4. Subcontractor shall perform technical studies, reviews, and assessments of the current program for advanced composites materials processing and testing. 5. Subcontractor shall attend meetings and discussions as directed by MEE-12 technical representative. Unfortunately during the course of FY93, technical and financial challenges prevailed against the aggressive goals set for the program. In point of fact, less than 25% of the contract value was able to be expended due to technical delays and programmatic funding cuts. Also, contracting difficulties with the SSC Lab and financial burdens at Los Alamos totally stopped progress on the subject subcontract during the whole of FY94. This was a great blow to me and the HTES, Inc. technical staff. Despite the negative influences over the years, significant progress was made in materials properties quantification and development of essential research and development documentation. The following brief report and attendant appendices will address these achievements.

  20. Construction of scales to measure leadership behavior at nuclear power plants. 1

    Energy Technology Data Exchange (ETDEWEB)

    Misumi, Jyuji; Yamada, Akira [Institute of Nuclear Safety System Inc., Kyoto (Japan); Shinohara, Shinobu [and others

    1994-05-01

    In order to construct scales to measure leadership behavior of managers and supervisors at nuclear power plants, we prepared questionnaire covering all the leadership behaviors of leaders and then had their subordinates fill out the questionnaire. We selected questionnaire items for use in measuring leadership behaviors, analyzing the responses by means of factor analysis, etc. For the section chiefs, five factors were named, i.e., `consideration` and `self-righteousness` that belong to group maintenance behavior and `thorough dissemination of information`, `specialty, planning` and `pressure` that belong to goal achievement behavior. For the maintenance subsection chiefs were found seven factors, i.e., `example setting`, `appropriate handling of work`, `planning`, `rigidity`, `educational guidance` that belong to goal achievement behavior and `consideration for work` and `personal consideration` that belong to group maintenance behavior. For maintenance and repair foremen were named six factors, i.e., `consideration` that belongs to group maintenance behavior and `specialty, planning`, `reporting, liaison`, `adjustment, rigidity`, `paper work confirmation`, and `example setting` that belong to goal achievement behavior. For subcontractors` field leaders were named seven factors, i.e., `example setting, specialty and planning`, `careful guidance`, `rigidity`, `observance of rules` and `paper work handling` that belong to goal achievement behavior and, `consideration`, `frank communication`. In order to examine the validity of these items, we analyzed relationship between the `morale`-(satisfaction, etc.) variables of the company`s regular employees and subcontractors` employees and their leadership. It was found that the three leadership behavior scales for the section chiefs, maintenance and repair subsection chiefs and subcontractor leaders were very much the same as those found in private sector. (J.P.N.)

  1. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject

  2. Capturing Requirements for Autonomous Spacecraft with Autonomy Requirements Engineering

    Science.gov (United States)

    Vassev, Emil; Hinchey, Mike

    2014-08-01

    The Autonomy Requirements Engineering (ARE) approach has been developed by Lero - the Irish Software Engineering Research Center within the mandate of a joint project with ESA, the European Space Agency. The approach is intended to help engineers develop missions for unmanned exploration, often with limited or no human control. Such robotics space missions rely on the most recent advances in automation and robotic technologies where autonomy and autonomic computing principles drive the design and implementation of unmanned spacecraft [1]. To tackle the integration and promotion of autonomy in software-intensive systems, ARE combines generic autonomy requirements (GAR) with goal-oriented requirements engineering (GORE). Using this approach, software engineers can determine what autonomic features to develop for a particular system (e.g., a space mission) as well as what artifacts that process might generate (e.g., goals models, requirements specification, etc.). The inputs required by this approach are the mission goals and the domain-specific GAR reflecting specifics of the mission class (e.g., interplanetary missions).

  3. Tool-based requirement traceability between requirement and design artifacts

    CERN Document Server

    Turban, Bernhard

    2013-01-01

    Processes for developing safety-critical systems impose special demands on ensuring requirements traceability. Achieving valuable traceability information, however, is especially difficult concerning the transition from requirements to design. Bernhard Turban analyzes systems and software engineering theories cross-cutting the issue (embedded systems development, systems engineering, software engineering, requirements engineering and management, design theory and processes for safety-critical systems). As a solution, the author proposes a new tool approach to support designers in their thinkin

  4. Breckinridge Project, initial effort

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1982-09-01

    Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.

  5. An Introduction to Intelligent Processing Programs Developed by the Air Force Manufacturing Technology Directorate

    Science.gov (United States)

    Sampson, Paul G.; Sny, Linda C.

    1992-01-01

    The Air Force has numerous on-going manufacturing and integration development programs (machine tools, composites, metals, assembly, and electronics) which are instrumental in improving productivity in the aerospace industry, but more importantly, have identified strategies and technologies required for the integration of advanced processing equipment. An introduction to four current Air Force Manufacturing Technology Directorate (ManTech) manufacturing areas is provided. Research is being carried out in the following areas: (1) machining initiatives for aerospace subcontractors which provide for advanced technology and innovative manufacturing strategies to increase the capabilities of small shops; (2) innovative approaches to advance machine tool products and manufacturing processes; (3) innovative approaches to advance sensors for process control in machine tools; and (4) efforts currently underway to develop, with the support of industry, the Next Generation Workstation/Machine Controller (Low-End Controller Task).

  6. A Technological Comparison of Six Processes for the Production of Reduction-Grade Alumina from Non-Bauxitic Raw Materials

    Science.gov (United States)

    Bengtson, K. B.

    The U. S. Bureau of Mines, by means of a contract with Kaiser Engineers and with Kaiser Aluminum & Chemical Corporation as a subcontractor, has sponsored a technological and an economic evaluation of six candidate processes for the manufacture of alumina from certain U. S. raw materials other than bauxite. This paper describes each process. Flow diagrams and the total energy requirement for each process are included. Important characteristics affecting the economics of producing alumina by each process are discussed, and some presently unsolved technical problems are identified. The extraction of alumina from clay via hydrochloric acid with iron separation by solvent extraction, and the crystallization of intermediate AlCl3·6H2O through the introduction of HCl gas into the pregnant mother liquor, appears to be technically feasible and the most attractive of the six raw material/process combinations.

  7. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2; TOPICAL

    International Nuclear Information System (INIS)

    GRYGIEL, M.L.

    1998-01-01

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system

  8. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  9. Summary of the production of the ACN cavities

    CERN Document Server

    Losito, R

    2004-01-01

    The LHC-ACN RF system consists of eight normal conducting cavities (four per beam) made of bulk copper and resonating at 200.4 MHz. CERN provided the forged copper parts to the contractor for the final machining and assembly (Ettore Zanon S.p.A., based in Schio, Italy). The contractor had to weld all the flanges to the body of the cavity, machine and weld the cooling channels, carry out the final machining to have the right geometry and the requested RF surface finish, and make the final assembly of all the components by electron beam welding. The precision required during the various steps is quite tight with respect to the dimension of the cavities and would have required a very time-consuming and costly quality check during production, with the constant presence of a CERN staff member at the contractor's and subcontractor's premises. It was therefore decided, in the engineering phase, to foresee a tuning procedure before the final weldings to allow the same final result (precision on fundamental mode frequ...

  10. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17-21, 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team's findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ''US Department of Energy Voluntary Protection Program, Part 1: Program Elements'' to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA's VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status

  11. Oak Ridge National Laboratory remedial investigation/feasibility study

    International Nuclear Information System (INIS)

    Glenn, R.D.; Hoffman, J.M.; Hyde, L.D.

    1988-01-01

    The Oak Ridge National Laboratory (ORNL) Remedial Investigation/ Feasibility Study (RI/FS) began in June 1987 to evaluate 13 contaminated waste area groupings (WAGs) to determine the feasibility and benefits of potential remedial action. The RI/FS and any future remedial action at ORNL will be of national significance and will likely lead to developments that will become models for environmental investigations and cleanups. Bechtel National, Inc. and a team of subcontractors will be working with Martin Marietta Energy systems to conduct intensive field investigations to obtain data required to evaluate the WAGs. The RI/F project continued in FY 1988 with project planning and preparation for field activities. Remedial Investigation (RI) Plans were prepared for 10 of the 13 WAGs. These plans were developed with sufficient information to ensure compliance with regulatory requirements, with intensive attention given to environmental, safety, and health protection; waste management; data management; and quality assurance. This paper reports on the progress made during FY 1988 and discusses activities planned for FY 1989

  12. VUJE tasks and activities during gradual upgrading

    International Nuclear Information System (INIS)

    Ferenc, M.

    2001-01-01

    The paper describes the organization and management of the Gradual Upgrading of the Bohunice V1 NPP and the principle tasks and scope of activities provided by VUJE Trnava, Inc. It also describes the system of supplies and the system of quality assurance both in the consortium and in subcontractors. (author)

  13. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  14. HTGR gas-turbine program. Semiannual progress report for period ending March 31, 1980

    International Nuclear Information System (INIS)

    1982-01-01

    This report describes the conceptual design and analysis performed by General Atomic Company and its subcontractors for the US Department of Energy on the direct cycle gas turbine high-temperature gas-cooled reactor. The primary accomplishments for this period were cost reduction studies, turbomachinery failure analysis, and alternate plant concept evaluation

  15. 75 FR 7582 - Access by EPA Contractors to Information Claimed as Confidential Business Information (CBI...

    Science.gov (United States)

    2010-02-22

    ... subcontractor, Computer Sciences Corporation (CSC), of the same address, provide IT support services related to... collected in order to register fuels and fuel additives prior to introduction into commerce and to certify... Vista Computer Services, under Contract Number 68-W3-0032. From October 1, 1998 until March 31, 2004...

  16. National Waste Terminal Storage Program Information Management Plan. Volume I. Management summary

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan is needed for the processing of the large amount of documentation that will accumulate in the National Waste Terminal Storage program over the next decade. The plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to external documentation from OWI organizations

  17. 29 CFR 4.114 - Subcontracts.

    Science.gov (United States)

    2010-07-01

    ... Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Covered Contracts Generally § 4.114 Subcontracts. (a) “Contractor” as including “subcontractor... contractor undertakes a contract subject to the Act, the contractor agrees to assume the obligation that the...

  18. 29 CFR 471.23 - What other provisions apply to this part?

    Science.gov (United States)

    2010-07-01

    ... NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Ancillary Matters § 471.23 What other provisions apply... 29 Labor 2 2010-07-01 2010-07-01 false What other provisions apply to this part? 471.23 Section...

  19. 48 CFR 352.242-71 - Tobacco-free facilities.

    Science.gov (United States)

    2010-10-01

    ... personal or company vehicles operated by Contractor employees while on an HHS property. This policy also... HHS policy will apply to the maximum area permitted by both law and current lease agreements. The Contractor shall ensure that each of its employees, and any subcontractor staff, is made aware of, understand...

  20. 22 CFR 311.105 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Definitions. 311.105 Section 311.105 Foreign Relations PEACE CORPS NEW RESTRICTIONS ON LOBBYING General § 311.105 Definitions. For purposes of this part...

  1. 45 CFR 1230.105 - Definitions.

    Science.gov (United States)

    2010-10-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 45 Public Welfare 4 2010-10-01 2010-10-01 false Definitions. 1230.105 Section 1230.105 Public... NEW RESTRICTIONS ON LOBBYING General § 1230.105 Definitions. For purposes of this part: (a) Agency, as...

  2. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  3. Environmental Requirements Management

    Energy Technology Data Exchange (ETDEWEB)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  4. 29 CFR 3.4 - Submission of weekly statements and the preservation and inspection of weekly payroll records.

    Science.gov (United States)

    2010-07-01

    ... inspection of weekly payroll records. 3.4 Section 3.4 Labor Office of the Secretary of Labor CONTRACTORS AND... STATES § 3.4 Submission of weekly statements and the preservation and inspection of weekly payroll... subcontractor, within seven days after the regular payment date of the payroll period, to a representative of a...

  5. 29 CFR 3.6 - Payroll deductions permissible with the approval of the Secretary of Labor.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Payroll deductions permissible with the approval of the Secretary of Labor. 3.6 Section 3.6 Labor Office of the Secretary of Labor CONTRACTORS AND SUBCONTRACTORS ON....6 Payroll deductions permissible with the approval of the Secretary of Labor. Any contractor or...

  6. 76 FR 75945 - Safety Advisory 2011-03

    Science.gov (United States)

    2011-12-05

    ... bridge worker, railroad, and contractor or subcontractor to a railroad of the dangers posed by walking on... Worker Protection was established. After the worker took the stop boards down, he began walking on... approximately 10-inch-wide horizontal I-beam that was located 11 feet below the platform. The coworker was able...

  7. Study of Radiation Hardness of Lattice Matched AlInN/GaN HEMT Heterostructures

    Science.gov (United States)

    2016-10-01

    the wedge to a nanomanipulator probe. d- Lifting -out of the wedge from the bulk sample. e- Attachment of a portion of the wedge to one of the silicon...out by subcontractor Scientic, Inc. The exposures were conducted at the Gamma Radiation Facility at NAVSEA Crane division with doses up to ~6 Mrad

  8. 77 FR 4564 - Request for Information Regarding the Reinsurance Program Under the Affordable Care Act

    Science.gov (United States)

    2012-01-30

    ...? 12. What COIs could arise for such potential subcontractors? Data Collection 13. Describe current... comments in the CMS drop slots located in the main lobby of the building. A stamp- in clock is available... reinsurance program. Section 1321(c)(1) of the Affordable Care Act directs the Secretary to take such actions...

  9. 29 CFR 1979.103 - Filing of discrimination complaint.

    Science.gov (United States)

    2010-07-01

    ... subcontractor of an air carrier in violation of the Act may file, or have filed by any person on the employee's... acts and omissions, with pertinent dates, which are believed to constitute the violations. (c) Place of filing. The complaint should be filed with the OSHA Area Director responsible for enforcement activities...

  10. 10 CFR 835.2 - Definitions.

    Science.gov (United States)

    2010-01-01

    ... employee means an individual who is either a DOE or DOE contractor employee; an employee of a subcontractor to a DOE contractor; or an individual who performs work for or in conjunction with DOE or utilizes... doses to various tissues or organs in the body (HT,50), each multiplied by the appropriate tissue...

  11. Impacts of a Violence Prevention Program for Middle Schools: Findings after 3 Years of Implementation. NCEE 2011-4017

    Science.gov (United States)

    Silvia, Suyapa; Blitstein, Jonathan; Williams, Jason; Ringwalt, Chris; Dusenbury, Linda; Hansen, William

    2011-01-01

    This is the second and final report summarizing findings from an impact evaluation of a violence prevention intervention for middle schools. This report provides findings from the second and third years of the 3-year intervention. The U.S. Department of Education (ED) contracted with RTI International and its subcontractors, Pacific Institute for…

  12. 29 CFR 1925.1 - Scope and application.

    Science.gov (United States)

    2010-07-01

    ... working conditions, provided by or under the control or supervision of the contractor or any subcontractor... health measures provided in § 1925.2 to result in working conditions which are “unsanitary or hazardous.... Neither do the standards expressed in this Part 1925 purport to cover all of the working conditions which...

  13. 78 FR 54250 - Federal Acquisition Regulation; Information Collection; American Recovery and Reinvestment Act...

    Science.gov (United States)

    2013-09-03

    ... Recovery Act; d. A narrative description of the employment impact of the Recovery Act funded work; and e... subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the... data was a sufficient baseline for estimating the number of respondents per year (2,247) that would...

  14. 32 CFR 203.6 - Cost principles.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Cost principles. 203.6 Section 203.6 National... Cost principles. (a) Non-profit contractors must comply with the cost principles in OMB Circular A-122...) For-profit contractors and subcontractors must comply with the cost principles in the FAR (48 CFR part...

  15. 32 CFR 28.105 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 32 National Defense 1 2010-07-01 2010-07-01 false Definitions. 28.105 Section 28.105 National... RESTRICTIONS ON LOBBYING General § 28.105 Definitions. For purposes of this part: (a) Agency, as defined in 5 U...

  16. 38 CFR 45.105 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... private sector. (o) Recipient includes all contractors, subcontractors at any tier, and subgrantees at any... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Definitions. 45.105... RESTRICTIONS ON LOBBYING General § 45.105 Definitions. For purposes of this part: (a) Agency, as defined in 5 U...

  17. 40 CFR 34.105 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Definitions. 34.105 Section 34.105... RESTRICTIONS ON LOBBYING General § 34.105 Definitions. For purposes of this part: (a) Agency, as defined in 5 U...

  18. 29 CFR 93.105 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 29 Labor 1 2010-07-01 2010-07-01 true Definitions. 93.105 Section 93.105 Labor Office of the Secretary of Labor NEW RESTRICTIONS ON LOBBYING General § 93.105 Definitions. For purposes of this part: (a...

  19. 41 CFR 105-69.105 - Definitions.

    Science.gov (United States)

    2010-07-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Definitions. 105-69.105... RESTRICTIONS ON LOBBYING General § 105-69.105 Definitions. For purposes of this part: (a) Agency, as defined in...

  20. 49 CFR 30.9 - Citizenship: Direct or indirect control.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Citizenship: Direct or indirect control. 30.9 Section 30.9 Transportation Office of the Secretary of Transportation DENIAL OF PUBLIC WORKS CONTRACTS TO... title to 50 percent or more of the stock of the contractor or subcontractor is held subject to trust or...

  1. Feed tank transfer requirements

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.

    1998-01-01

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B

  2. Progressively safer, cheaper demolition of Fernald

    International Nuclear Information System (INIS)

    Nichols, Robert; Pennington, Norman

    2000-01-01

    Fluor Fernald, Inc. has been progressively improving Decontamination and Dismantlement (D and D) at the Department of Energy's Fernald Environmental Management Project by applying new technologies and better methodologies to the work. Demolition issues existed in the past that necessitated new or improved solutions to maintain worker safety, protect the environment and accomplish the work in a cost effective manner. Lessons learned from D and D of 80 structures has led to a systematic approach, which can be implemented in various D and D arenas. When facility production was halted, hold-up material and process residues remained in the process piping and components. Over 500,000 pounds of material was removed by workers who completed the tasks two years ahead of schedule, $7 million under budget and with an excellent safety record. This success was the result of detailed planning and irdision of lessons learned as work progressed from facility to facility. Work sequences were developed that reduced airborne contamination. Demolition of structures has been performed at Fernald by carefully selected and qualified subcontractors. Asbestos and lead abatement, equipment, piping and conduit removal, and structural demolition have been completed to progressively higher performance specifications developed by Fluor Fernald based on lessons learned during execution. Safety continues to be the primary consideration in performing potentially hazardous work. Technologies such as hydraulic shears have been developed and used to keep workers away from danger. A new technology, ''Cool Suits,'' has been demonstrated to help prevent heat stress when anti-contamination clothing is required in elevated temperature working conditions. For tall structures, implosion technologies have been employed with progressively improved results, Several other new technologies have been evaluated by Fluor Fernald and applied by subcontractors. The improved technologies included the oxy-gas torch

  3. Present situation of occupational radiation exposure in nuclear power plants

    International Nuclear Information System (INIS)

    Imabori, Akira

    1979-01-01

    The present situation of the radiation exposure of workers, including both employes and subcontractors, in the nuclear power plants in Japan, is presented. Twenty seven nuclear power reactors in operation and under construction are tabulated with the name, the owner, the electric output and the commissioning year of each plant. The results of exposure of the workers in these plants are shown, classifying the dose rate into less than 0.5 rem, 0.5 - 1.5 rem, 1.5 - 2.5 rem, 2.5 - 5 rem and more than 5 rem, and the workers into employes and subcontractors. It is noted that the exposure dose of the subcontractors occupies about 88% of all exposure dose, and the exposure is concentrated during regular inspection period. The exposure dose of about 80% of the workers is less than 0.5 rem, and no one was irradiated more than 5 rem in a year. The total exposure dose, which has especially the tendency of increasing with extended maintenance period and decreasing during plant operation period, shows also the trend of increasing with the lapse of operation years. As for the point of view of whole exposure dose, the value is 0.06 -- 0.43 man-rem/10 6 kWh in 1976 FY. It is considered to be necessary to grasp the total exposure dose of each worker wandering from one plant to another, and the central registration center for the workers in radioactive environment was established in 1978. The whole exposure dose data of each worker are stored in the central computer in this center. This system is highly appreciated in radiation exposure management. The total exposure dose is related to the rate of utilization of nuclear plants, and it is expected to decrease with the decrease of plant outage. (Nakai, Y.)

  4. 29 CFR 3.9 - Prohibited payroll deductions.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Prohibited payroll deductions. 3.9 Section 3.9 Labor Office of the Secretary of Labor CONTRACTORS AND SUBCONTRACTORS ON PUBLIC BUILDING OR PUBLIC WORK FINANCED IN WHOLE OR IN PART BY LOANS OR GRANTS FROM THE UNITED STATES § 3.9 Prohibited payroll deductions...

  5. 48 CFR 936.202-70 - Specifications charges.

    Science.gov (United States)

    2010-10-01

    ..., subcontractors, and material and equipment suppliers. Where the cost of reproduction is $10 or more, the charge shall be a minimum of $10 and subject to a maximum of $500, depending upon the size of the project and...., builders and contractors exchanges in the locality in which the project is to be constructed, and others...

  6. The physical protection systems at the Czech nuclear installations and the Y2K issue

    International Nuclear Information System (INIS)

    Malach, J.; Seifert, Z.; Sedlacek, J.; Bartak, L.; Polanka, J.

    1999-01-01

    The paper describes the joint effort of the State Office for Nuclear Safety, EZ, a.s., Nuclear Power Plant Dukovany and EBIS Ltd., as a subcontractor, to solve the problem of the Y2K particularly in connection with real time operation of the integrated physical protection system at Nuclear Power Plant Dukovany. (author)

  7. 48 CFR 52.249-14 - Excusable Delays.

    Science.gov (United States)

    2010-10-01

    ... under its terms if the failure arises from causes beyond the control and without the fault or negligence... each instance, the failure to perform must be beyond the control and without the fault or negligence of... subcontractor, and without the fault or negligence of either, the Contractor shall not be deemed to be in...

  8. Le budget total du CERN restera plus ou moins constant

    CERN Document Server

    Van der Boon, J E

    2002-01-01

    The Director of Administration at CERN has written to the paper following an article titled "Licenciements chez les sous-traitants du CERN" : dismissals amongst CERN sub-contractors. As the CERN budget will remain constant and a greater part will be devoted to building the LHC, changes will be made to staffing balances (0.5 page)

  9. 48 CFR 1019.202-70-7 - Mentor firms.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Mentor firms. 1019.202-70... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 1019.202-70-7 Mentor firms. A mentor firm may be either... developmental assistance to enhance the capabilities of protégés to perform as subcontractors. Mentors will be...

  10. 18 CFR 1315.105 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Definitions. 1315.105... LOBBYING General § 1315.105 Definitions. For purposes of this part: (a) Agency, as defined in 5 U.S.C. 552...

  11. 24 CFR 87.105 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... services in the private sector. (o) Recipient includes all contractors, subcontractors at any tier, and... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Definitions. 87.105 Section 87.105... RESTRICTIONS ON LOBBYING General § 87.105 Definitions. For purposes of this part: (a) Agency, as defined in 5 U...

  12. CH2M Hill Hanford Group, Inc., Standards and Requirements Identification Document (SRID) Requirements Management System and Requirements Specification

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    2000-01-01

    The current Tank Farm Contractor (TFC) for the U. S. Department of Energy, Office of River Protection (ORP), River Protection Project (RPP), CH2M Hill Hanford Group, Inc. (CHG), will use a computer based requirements management system. The system will serve as a tool to assist in identifying, capturing, and maintaining the Standards/Requirements Identification Document (S/RID) requirements and links to implementing procedures and other documents. By managing requirements as one integrated set, CHG will be able to carry out its mission more efficiently and effectively. CHG has chosen the Dynamic Object Oriented Requirements System (DOORS(trademark)) as the preferred computer based requirements management system. Accordingly, the S/RID program will use DOORS(trademark). DOORS(trademark) will replace the Environmental Requirements Management Interface (ERMI) system as the tool for S/RID data management. The DOORS(trademark) S/RID test project currently resides on the DOORSTM test server. The S/RID project will be migrated to the DOORS(trademark) production server. After the migration the S/RID project will be considered a production project and will no longer reside on the test server

  13. Newly Generated Liquid Waste Processing Alternatives Study, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Landman, William Henry; Bates, Steven Odum; Bonnema, Bruce Edward; Palmer, Stanley Leland; Podgorney, Anna Kristine; Walsh, Stephanie

    2002-09-01

    This report identifies and evaluates three options for treating newly generated liquid waste at the Idaho Nuclear Technology and Engineering Center of the Idaho National Engineering and Environmental Laboratory. The three options are: (a) treat the waste using processing facilities designed for treating sodium-bearing waste, (b) treat the waste using subcontractor-supplied mobile systems, or (c) treat the waste using a special facility designed and constructed for that purpose. In studying these options, engineers concluded that the best approach is to store the newly generated liquid waste until a sodium-bearing waste treatment facility is available and then to co-process the stored inventory of the newly generated waste with the sodium-bearing waste. After the sodium-bearing waste facility completes its mission, two paths are available. The newly generated liquid waste could be treated using the subcontractor-supplied system or the sodium-bearing waste facility or a portion of it. The final decision depends on the design of the sodium-bearing waste treatment facility, which will be completed in coming years.

  14. A prequalifying program for evaluating the analytical performance of commercial laboratories

    International Nuclear Information System (INIS)

    Reith, C.C.; Bishop, C.T.

    1987-01-01

    Soil and water samples were spiked with known activities of radionuclides and sent to seven commercial laboratories that had expressed an interest in analyzing environmental samples for the Waste Isolation Pilot Plant (WIPP). This Prequalifying Program was part of the selection process for an analytical subcontractor for a three-year program of baseline radiological surveillance around the WIPP site. Both media were spiked at three different activity levels with several transuranic radionuclides, as well as tritium, fission products, and activation products. Laboratory performance was evaluated by calculating relative error for each radionuclide in each sample, assigning grade values, and compiling grades into report cards for each candidate. Results for the five laboratories completing the Prequalifying Program were pooled to reveal differing degrees of difficulty among the treatments and radionuclides. Interlaboratory comparisons revealed systematic errors in the performance of one candidate. The final report cards contained clear differences among overall grades for the five laboratories, enabling analytical performance to be used as a quantitative criterion in the selection of an analytical subcontractor. (author)

  15. CFFTP annual report 1990/91

    International Nuclear Information System (INIS)

    1991-01-01

    The Canadian Fusion Fuels Technology Project (CFFTP) is working in partnership with federal and provincial governments, industry, universities and the scientific community to transfer technology to the private sector, develop a base of Canadian scientific capability, and encourage young people to enter an advanced field of research and development. Canadian fusion efforts have a total value of $25 million a year. CFFTP's efforts have been directed toward providing universities and industries with the opportunity to become involved in scientific and technical collaboration on major fusion projects abroad. Base funding is provided by the three CFFTP founding partners: the federal government, the Ontario government, and Ontario Hydro. Client funds are received from fusion projects in the U.S. and Europe for services and manufactured hardware, and subcontractor funds arrive in the form of in-kind contributions from subcontractors on development contracts awarded by CFFTP. More than 75 percent of these funds are used to carry out research, engineering, and manufacturing activities through subcontracts to affiliated research centres, universities and industry

  16. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1994

    International Nuclear Information System (INIS)

    1994-11-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work

  17. Development of a safety communication and recognition program for construction.

    Science.gov (United States)

    Sparer, Emily H; Herrick, Robert F; Dennerlein, Jack T

    2015-05-01

    Leading-indicator-based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator-based (e.g., injury rates) programs. We designed a leading-indicator-based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  18. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION

    International Nuclear Information System (INIS)

    K. Payette; D. Tillman

    2001-01-01

    During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker

  19. Feed tank transfer requirements

    Energy Technology Data Exchange (ETDEWEB)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  20. Feed tank transfer requirements

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.

    1998-01-01

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented

  1. Installation and routing of critical embedments at the Hanford Waste Vitrification Plant

    International Nuclear Information System (INIS)

    Van Katwijk, C.; Keenan, R.M.; Watts, C.

    1993-01-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed by Fluor Daniel. Waste Chem Corporation is providing specialized expertise as Fluor Daniel's major subcontractor for vitrification and remote systems technologies. Westinghouse Hanford Company (Westinghouse Hanford) is the Project Integration manager and Business manager, and as the plant operator it provides technical direction to the Architect/Engineer team and constructor on behalf of the US Department of Energy, Richland Field Office. The Hot Cell portion of HWVP Vitrification Building contains very congested piping systems in the walls that penetrate in to the cells to nozzles for remote piping jumper assemblies. These nozzles require very tight tolerances to ensure a leak-tight fit to the jumpers. An approach has been developed that minimizes the time and expense of installing these nozzles in the wall to tight construction tolerances. This approach is called the Ganged Embed Plate (GEP) design

  2. SRS Burial Ground Complex: Remediation in Progress

    International Nuclear Information System (INIS)

    Griffin, M.; Crapse, B.; Cowan, S.

    1998-01-01

    Closure of the various areas in the Burial Ground Complex (BGC) represents a major step in the reduction of risk at the Savannah River Site (SRS) and a significant investment of resources. The Burial Ground Complex occupies approximately 195 acres in the central section of the SRS. Approximately 160 acres of the BGC consists of hazardous and radioactive waste disposal sites that require remediation. Of these source acres, one-third have been remediated while two-thirds are undergoing interim or final action. These restoration activities have been carried out in a safe and cost effective manner while minimizing impact to operating facilities. Successful completion of these activities is in large part due to the teamwork demonstrated by the Department of Energy, contractor/subcontractor personnel, and the regulatory agencies. The experience and knowledge gained from the closure of these large disposal facilities can be used to expedite closure of similar facilities

  3. Status of the GA/MCA 12 Tesla Coil Development Program

    International Nuclear Information System (INIS)

    Alcorn, J.S.; Purcell, J.R.; Chen, W.Y.; Hsu, Y.H.

    1980-09-01

    The current status of the Team One effort of the DOE/OFE/D and T 12 Tesla Coil Development Program is presented. Subatmospheric, helium bath cooled, NbTiTa alloy is employed for the test coil, and ETF TF-coil concept. General Atomic is the Team One leader, with Magnetic Corporation of American as industrial subcontractor

  4. Caorso - the first of the new generation of Italian nuclear power plants

    International Nuclear Information System (INIS)

    Rousek, J.

    1976-01-01

    The time schedule of the construction, the sub-contractors supplying the main parts of the nuclear power plant, and the technical parameters of the CAORSO power plant are given. The nuclear and the conventional part of the power plant and its connection to the power supply and the preparation of plant operation are described. (J.P.)

  5. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  6. 48 CFR 1652.249-72 - FEHBP termination for default-negotiated benefits contracts.

    Science.gov (United States)

    2010-10-01

    ... negligence of the Carrier. Examples of such causes include (1) acts of God or of the public enemy, (2) acts... negligence of the Carrier. (d) If the failure to perform is caused by the default of a subcontractor at any... without the fault or negligence of either, the Carrier shall not be liable for any excess costs for...

  7. Finance and supply management project execution plan; TOPICAL

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes

  8. 29 CFR 4.159 - General minimum wage.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true General minimum wage. 4.159 Section 4.159 Labor Office of... General minimum wage. The Act, in section 2(b)(1), provides generally that no contractor or subcontractor... a contract less than the minimum wage specified under section 6(a)(1) of the Fair Labor Standards...

  9. Decontamination and decommissioning of the JANUS reactor at the Argonne National Laboratory-East site

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Garlock, G.A.

    1997-05-01

    Argonne National Laboratory has begun the decontamination and decommissioning (D ampersand D) of the JANUS Reactor Facility. The project is managed by the Technology Development Division's D ampersand D Program personnel. D ampersand D procedures are performed by sub-contractor personnel. Specific activities involving the removal, size reduction, and packaging of radioactive components and facilities are discussed

  10. Transportation System Requirements Document

    International Nuclear Information System (INIS)

    1993-09-01

    This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification

  11. Replacing reserve requirements

    OpenAIRE

    Edward J. Stevens

    1993-01-01

    An examination of the fading significance of the Federal Reserve System's reserve requirements and the recent flowering of required clearing balances, a rapidly growing feature of Reserve Bank operations.

  12. TRANSPORTATION SYSTEM REQUIREMENTS DOCUMENT

    International Nuclear Information System (INIS)

    2004-01-01

    This document establishes the Transportation system requirements for the U.S. Department of Energy's (DOE's) Civilian Radioactive Waste Management System (CRWMS). These requirements are derived from the Civilian Radioactive Waste Management System Requirements Document (CRD). The Transportation System Requirements Document (TSRD) was developed in accordance with LP-3.1Q-OCRWM, Preparation, Review, and Approval of Office of National Transportation Level-2 Baseline Requirements. As illustrated in Figure 1, the TSRD forms a part of the DOE Office of Civilian Radioactive Waste Management (OCRWM) Technical Baseline

  13. Methodology to remediate a mixed waste site

    International Nuclear Information System (INIS)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ''lessons learned'' from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors

  14. Methodology to remediate a mixed waste site

    Energy Technology Data Exchange (ETDEWEB)

    Berry, J.B.

    1994-08-01

    In response to the need for a comprehensive and consistent approach to the complex issue of mixed waste management, a generalized methodology for remediation of a mixed waste site has been developed. The methodology is based on requirements set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA) and incorporates ``lessons learned`` from process design, remediation methodologies, and remediation projects. The methodology is applied to the treatment of 32,000 drums of mixed waste sludge at the Oak Ridge K-25 Site. Process technology options are developed and evaluated, first with regard to meeting system requirements and then with regard to CERCLA performance criteria. The following process technology options are investigated: (1) no action, (2) separation of hazardous and radioactive species, (3) dewatering, (4) drying, and (5) solidification/stabilization. The first two options were eliminated from detailed consideration because they did not meet the system requirements. A quantitative evaluation clearly showed that, based on system constraints and project objectives, either dewatering or drying the mixed waste sludge was superior to the solidification/stabilization process option. The ultimate choice between the drying and the dewatering options will be made on the basis of a technical evaluation of the relative merits of proposals submitted by potential subcontractors.

  15. Closure requirements

    International Nuclear Information System (INIS)

    Hutchinson, I.P.G.; Ellison, R.D.

    1992-01-01

    Closure of a waste management unit can be either permanent or temporary. Permanent closure may be due to: economic factors which make it uneconomical to mine the remaining minerals; depletion of mineral resources; physical site constraints that preclude further mining and beneficiation; environmental, regulatory or other requirements that make it uneconomical to continue to develop the resources. Temporary closure can occur for a period of several months to several years, and may be caused by factors such as: periods of high rainfall or snowfall which prevent mining and waste disposal; economic circumstances which temporarily make it uneconomical to mine the target mineral; labor problems requiring a cessation of operations for a period of time; construction activities that are required to upgrade project components such as the process facilities and waste management units; and mine or process plant failures that require extensive repairs. Permanent closure of a mine waste management unit involves the provision of durable surface containment features to protect the waters of the State in the long-term. Temporary closure may involve activities that range from ongoing maintenance of the existing facilities to the installation of several permanent closure features in order to reduce ongoing maintenance. This paper deals with the permanent closure features

  16. An Industrial-Based Consortium to Develop Premium Carbon Products from Coal, Annual Progress Report, October 1, 2005 through September 30, 2006

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Bruce G

    2006-09-29

    Since 1998, The Pennsylvania State University has been successfully managing the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by Penn State, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350. This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes Penn State and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. Base funding for the selected projects is provided by NETL with matching funds from industry. At the annual funding meeting held in October 2003, ten projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten 2004 projects were completed during the previous annual reporting period and their final reports were submitted with the previous annual report (i.e., 10/01/04-09/30/05). The final report for the remaining project, which was submitted during this reporting

  17. Conversion of dependability deterministic requirements into probabilistic requirements

    International Nuclear Information System (INIS)

    Bourgade, E.; Le, P.

    1993-02-01

    This report concerns the on-going survey conducted jointly by the DAM/CCE and NRE/SR branches on the inclusion of dependability requirements in control and instrumentation projects. Its purpose is to enable a customer (the prime contractor) to convert into probabilistic terms dependability deterministic requirements expressed in the form ''a maximum permissible number of failures, of maximum duration d in a period t''. The customer shall select a confidence level for each previously defined undesirable event, by assigning a maximum probability of occurrence. Using the formulae we propose for two repair policies - constant rate or constant time - these probabilized requirements can then be transformed into equivalent failure rates. It is shown that the same formula can be used for both policies, providing certain realistic assumptions are confirmed, and that for a constant time repair policy, the correct result can always be obtained. The equivalent failure rates thus determined can be included in the specifications supplied to the contractors, who will then be able to proceed to their previsional justification. (author), 8 refs., 3 annexes

  18. Requirements in engineering projects

    CERN Document Server

    Fernandes, João M

    2016-01-01

    This book focuses on various topics related to engineering and management of requirements, in particular elicitation, negotiation, prioritisation, and documentation (whether with natural languages or with graphical models). The book provides methods and techniques that help to characterise, in a systematic manner, the requirements of the intended engineering system.  It was written with the goal of being adopted as the main text for courses on requirements engineering, or as a strong reference to the topics of requirements in courses with a broader scope. It can also be used in vocational courses, for professionals interested in the software and information systems domain.   Readers who have finished this book will be able to: - establish and plan a requirements engineering process within the development of complex engineering systems; - define and identify the types of relevant requirements in engineering projects; - choose and apply the most appropriate techniques to elicit the requirements of a giv...

  19. An Engineering Method of Civil Jet Requirements Validation Based on Requirements Project Principle

    Science.gov (United States)

    Wang, Yue; Gao, Dan; Mao, Xuming

    2018-03-01

    A method of requirements validation is developed and defined to meet the needs of civil jet requirements validation in product development. Based on requirements project principle, this method will not affect the conventional design elements, and can effectively connect the requirements with design. It realizes the modern civil jet development concept, which is “requirement is the origin, design is the basis”. So far, the method has been successfully applied in civil jet aircraft development in China. Taking takeoff field length as an example, the validation process and the validation method of the requirements are detailed introduced in the study, with the hope of providing the experiences to other civil jet product design.

  20. From requirements to Java in a snap model-driven requirements engineering in practice

    CERN Document Server

    Smialek, Michal

    2015-01-01

    This book provides a coherent methodology for Model-Driven Requirements Engineering which stresses the systematic treatment of requirements within the realm of modelling and model transformations. The underlying basic assumption is that detailed requirements models are used as first-class artefacts playing a direct role in constructing software. To this end, the book presents the Requirements Specification Language (RSL) that allows precision and formality, which eventually permits automation of the process of turning requirements into a working system by applying model transformations and co

  1. Getting Grip on Security Requirements Elicitation by Structuring and Reusing Security Requirements Sources

    Directory of Open Access Journals (Sweden)

    Christian Schmitt

    2015-07-01

    Full Text Available This paper presents a model for structuring and reusing security requirements sources. The model serves as blueprint for the development of an organization-specific repository, which provides relevant security requirements sources, such as security information and knowledge sources and relevant compliance obligations, in a structured and reusable form. The resulting repository is intended to be used by development teams during the elicitation and analysis of security requirements with the goal to understand the security problem space, incorporate all relevant requirements sources, and to avoid unnecessary effort for identifying, understanding, and correlating applicable security requirements sources on a project-wise basis. We start with an overview and categorization of important security requirements sources, followed by the description of the generic model. To demonstrate the applicability and benefits of the model, the instantiation approach and details of the resulting repository of security requirements sources are presented.

  2. Subsurface Contamination Focus Area technical requirements. Volume 1: Requirements summary

    International Nuclear Information System (INIS)

    Nickelson, D.; Nonte, J.; Richardson, J.

    1996-10-01

    This document summarizes functions and requirements for remediation of source term and plume sites identified by the Subsurface Contamination Focus Area. Included are detailed requirements and supporting information for source term and plume containment, stabilization, retrieval, and selective retrieval remedial activities. This information will be useful both to the decision-makers within the Subsurface Contamination Focus Area (SCFA) and to the technology providers who are developing and demonstrating technologies and systems. Requirements are often expressed as graphs or charts, which reflect the site-specific nature of the functions that must be performed. Many of the tradeoff studies associated with cost savings are identified in the text

  3. Waste management system requirements document

    International Nuclear Information System (INIS)

    1991-02-01

    This volume defines the top level requirements for the Mined Geologic Disposal System (MGDS). It is designed to be used in conjunction with Volume 1 of the WMSR, General System Requirements. It provides a functional description expanding the requirements allocated to the MGDS in Volume 1 and elaborates on each requirement by providing associated performance criteria as appropriate. Volumes 1 and 4 of the WMSR provide a minimum set of requirements that must be satisfied by the final MGDS design. This document sets forth specific requirements that must be fulfilled. It is not the intent or purpose of this top level document to describe how each requirement is to be satisfied in the final MGDS design. Each subsequent level of the technical document hierarchy must provide further guidance and definition as to how each of these requirements is to be implemented in the design. It is expected that each subsequent level of requirements will be significantly more detailed. Section 2 of this volume provides a functional description of the MGDS. Each function is addressed in terms of requirements, and performance criteria. Section 3 provides a list of controlling documents. Each document cited in a requirement of Chapter 2 is included in this list and is incorporated into this document as a requirement on the final system. The WMSR addresses only federal requirements (i.e., laws, regulations and DOE orders). State and local requirements are not addressed. However, it will be specifically noted at the potentially affected WMSR requirements that there could be additional or more stringent regulations imposed by a state or local requirements or administering agency over the cited federal requirements

  4. User Requirements for Wireless

    DEFF Research Database (Denmark)

    in the elicitation process. Cases and user requirement elements discussed in the book include: User requirements elicitation processes for children, construction workers, and farmers User requirements for personalized services of a broadcast company Variations in user involvement Practical elements of user...

  5. Trends and Challenges in Aerospace Offsets: Proceedings and Papers,

    Science.gov (United States)

    1999-01-01

    nancing, license production and co-production agreements, subcontractor pro- duction, countertrade , foreign investment, and labor adjustment...34 countertrade ," and they are similarly ineffi- cient and trade distorting from an economic perspective. By substituting various forms of barter for...U.S. or European producers because of severe financial constraints of prospective customers and a consequently high reliance on countertrade . But

  6. Bibliography of the published reports, papers, and articles on the Nevada Nuclear Waste Storage Investigations. Revision 1

    International Nuclear Information System (INIS)

    Lorenz, J.J.

    1981-11-01

    This document is a bibliography of the published reports, papers, and articles on the Nevada Nuclear Waste Storage Investigations (NNWSI). The bibliography is categorized by principal NNWSI participant organization; participant-sponsored subcontractor reports, papers, and articles are included in the sponsoring organization's bibliography list. The principal participant bibliography listings are arranged in chronological order by title. An author index is provided. 305 citations

  7. Guide for the assessment of the implementation of radiation protection in an electricity production nuclear centre. Report nr 292

    International Nuclear Information System (INIS)

    Schieber, C.

    2006-01-01

    The approach proposed for the assessment of the implementation of radiation protection comprises six main themes: radiation protection organisation, radiation protection steering quality, profession and subcontractor commitment, expertise and efficiency of the Risk Prevention Department, operational management of radiation protection, and robustness of the radioactive material transport system. Each theme is divided into sub-themes which are marked according to defined criteria

  8. Unconstitutionality of Section 11 subsec. 2 BTOElt. Ruling by the Hanover Administrative Court of December 16, 1992. Az. : 7 A 2746/92 (not yet official). Verfassungswidrigkeit des Para. 11 Abs. 2 BTOElt. Verwaltungsgericht Hannover, Urteil vom 16. Dezember 1992. Az. : 7 A 2746/92 (nicht rechtskraeftig)

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1993-06-01

    With this ruling, which is presented here in an abridged version, the Hanover Administrative Court set aside an administrative decision, based on Section 11, subsec. 2 BTO Elt, of the Minister of Economic Affairs of Niedersachsen against PreussenElektra AG. The Minister had ordered PreussenElektra, among others, to apply for permits for the rates charged to their subcontractors. (orig.)

  9. An approach to total quality assurance

    International Nuclear Information System (INIS)

    Archer, L.G.

    1976-01-01

    Total Quality Assurance must be based on amalgamating three quality functions: effective quality control, competent inspection, and regularly audited Quality Assurance programmes. In applying these functions the fuel supplier must regard each of his sub-contractors as part of his own works and ensure a common policy of motivated Quality Assurance throughout his own works and those of his suppliers. (author)

  10. Study of the Light Utility Helicopter (LUH) Acquisition Program as a Model for Defense Acquisition of Nondevelopmental Items

    Science.gov (United States)

    2014-12-01

    Local Economic Impact of UH-72A Manufacture ................42  viii e.  EADS’ (Now Airbus Group’s) Suppliers and Subcontractors...Headquarters, Department of the Army IFR instrument flight rules IOTE initial operational test and evaluation IR infrared KO contracting officer kt...instrument flight rules ( IFR ) and visual flight rules (VFR) capabilities, thereby allowing flight at night and under low visibility weather

  11. Safety review and approval process for the TFTR

    International Nuclear Information System (INIS)

    Levine, J.D.; Howe, H.J.; Howe, K.E.

    1983-01-01

    The design, construction, and operation of the Tokamak Fusion Test Reactor (TFTR) has undergone an extensive safety and enviromental analysis involving Princeton Plasma Physics Laboratory (PPPL), the U.S. Department of Energy (DOE), the Ebasco/Grumman Industrial Subcontractor Team, and other organizations. This analysis, which is continuing during the TFTR operational phase, has been facilitated by the preparation, review and approval of several documents, including an Environmental Statement (Draft and Final), a Preliminary Safety Analysis Report (PSAR), a Final Safety Analysis Report (FSAR), Operations Safety Requirements (OSRs) and Safety Requirements (SRs), and various Operating and Maintenance Manuals. Through TFTR Safety Group participation in formal system design evaluations, change control boards, and reviews of project procurement and installation documentation, the TFTR Management Configuration Control System assures that all aspects of the project, including proposed design, installation and operational changes, receive prompt and thorough safety analyses. These efforts will continue as the TFTR Program moves into the neutral beam and D-T operational phases. The safety review and approval experience that has been acquired on the TFTR Project should serve as a foundation for similar efforts on future fusion devices

  12. Future Home Network Requirements

    DEFF Research Database (Denmark)

    Charbonnier, Benoit; Wessing, Henrik; Lannoo, Bart

    This paper presents the requirements for future Home Area Networks (HAN). Firstly, we discuss the applications and services as well as their requirements. Then, usage scenarios are devised to establish a first specification for the HAN. The main requirements are an increased bandwidth (towards 1...

  13. 48 CFR 52.215-13 - Subcontractor Certified Cost or Pricing Data-Modifications.

    Science.gov (United States)

    2010-10-01

    ... cost or pricing data at FAR 15.403-4, on the date of agreement on price or the date of award, whichever... nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1... prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph...

  14. Evaluating the Availability, Role, and Performance of Subcontractors in the Aerospace Industry

    Science.gov (United States)

    1983-07-15

    or divestitures. It will include other operating revenue, installment sales and franchise sales when and if available. Net sales would exclude...information. The SBA’s PASS system could be used in a similar fashion to provide more specific product infointation, and this is currently under...December 1980 Report of the Defense Industi LaJ B se Pane] of the House Armed Services Committee. In 19 75 Air Force Logistics Command undertook an

  15. Requirements model generation to support requirements elicitation: The Secure Tropos experience

    NARCIS (Netherlands)

    Kiyavitskaya, N.; Zannone, N.

    2008-01-01

    In recent years several efforts have been devoted by researchers in the Requirements Engineering community to the development of methodologies for supporting designers during requirements elicitation, modeling, and analysis. However, these methodologies often lack tool support to facilitate their

  16. System requirements and design description for the environmental requirements management interface (ERMI)

    International Nuclear Information System (INIS)

    Biebesheimer, E.

    1997-01-01

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC

  17. 12 CFR 564.3 - Appraisals required; transactions requiring a State certified or licensed appraiser.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Appraisals required; transactions requiring a State certified or licensed appraiser. 564.3 Section 564.3 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY APPRAISALS § 564.3 Appraisals required; transactions requiring a State...

  18. PIT Coating Requirements Analysis

    International Nuclear Information System (INIS)

    MINTEER, D.J.

    2000-01-01

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products

  19. PIT Coating Requirements Analysis

    Energy Technology Data Exchange (ETDEWEB)

    MINTEER, D.J.

    2000-10-20

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

  20. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  1. National Ignition Facility quality assurance plan for laser materials and optical technology

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials & Optical Technology (LM&OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM&OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies.

  2. Guide to good practice in radiation protection training

    International Nuclear Information System (INIS)

    Johnson, N.; Schenley, C.; Smith, A.; Weseman, M.

    1988-10-01

    This set of guidelines applies to radiation protection training programs for all Department of Energy (DOE) contractors, subcontractors, and visitors to DOE contractor facilities. It is to be used as a self-evaluation tool by DOE contractors as they develop and evaluate their training programs. This document is based on good practice guidelines used by a variety of different facilities both within and outside of the DOE contractor system. Good practices are not requirements; they are guidelines that contractors should use as they develop and conduct training programs. The applicability of the contents of the Guide to Good Practice in Radiation Protection Training depends upon each DOE facility's scope and need for radiation safety training. Although the focus of this document is radiation protection training, it is important that the process by which training is developed and implemented be discussed. Therefore, the first section presents guidelines for performance-based training and ideas to be considered regarding the structure and documentation of the training function

  3. Testing of the West Valley Vitrification Facility transfer cart control system

    International Nuclear Information System (INIS)

    Halliwell, J.W.; Bradley, E.C.

    1995-01-01

    Oak Ridge National Laboratory (ORNL) has designed and tested the control system for the West Valley Demonstration Project Vitrification Facility transfer cart. The transfer cart will transfer canisters of vitrified high-level waste remotely within the Vitrification Facility. The control system operates the cart under battery power by wireless control. The equipment includes cart-mounted control electronics, battery charger, control pendants, engineer's console, and facility antennas. Testing was performed in several phases of development: (1) prototype equipment was built and tested during design, (2) board-level testing was then performed at ORNL during fabrication, and (3) system-level testing was then performed by ORNL at the fabrication subcontractor's facility for the completed cart system. These tests verified (1) the performance of the cart relative to design requirements and (2) operation of various built-in cart features. The final phase of testing is planned to be conducted during installation at the West Valley Vitrification Facility

  4. TA-55 change control manual

    International Nuclear Information System (INIS)

    Blum, T.W.; Selvage, R.D.; Courtney, K.H.

    1997-11-01

    This manual is the guide for initiating change at the Plutonium Facility, which handles the processing of plutonium as well as research on plutonium metallurgy. It describes the change and work control processes employed at TA-55 to ensure that all proposed changes are properly identified, reviewed, approved, implemented, tested, and documented so that operations are maintained within the approved safety envelope. All Laboratory groups, their contractors, and subcontractors doing work at TA-55 follow requirements set forth herein. This manual applies to all new and modified processes and experiments inside the TA-55 Plutonium Facility; general plant project (GPP) and line item funded construction projects at TA-55; temporary and permanent changes that directly or indirectly affect structures, systems, or components (SSCs) as described in the safety analysis, including Facility Control System (FCS) software; and major modifications to procedures. This manual does not apply to maintenance performed on process equipment or facility SSCs or the replacement of SSCs or equipment with documented approved equivalents

  5. National Ignition Facility quality assurance plan for laser materials and optical technology

    International Nuclear Information System (INIS)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials ampersand Optical Technology (LM ampersand OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM ampersand OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies

  6. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  7. Problems of power plant capital demands

    International Nuclear Information System (INIS)

    Slechta, V.; Bohal, L.

    1986-01-01

    The problems are discussed of requirements for investment for power plants in Czechoslovakia. Since the construction was finished of coal-burning 110 MW power plants with six power units, specific capital cost has steadily been growing. The growth amounts to 6 to 8% per year while the principle has been observed that specific capital cost decreases with increased unit power. Attention is paid to the cost of the subcontractors of the building and technological parts of a power plant and to the development of productivity of labour. A comparison is tabulated of cost for coal-burning power plants with 100 MW and 200 MW units and for nuclear power plants with WWER-440 reactors. Steps are suggested leading to a reduction of the capital cost of nuclear power plants. It is stated that should not these steps be taken, the envisaged development of nuclear power would be unbearable for the Czechoslovak national economy. (Z.M.). 8 tabs., 3 refs

  8. Development Application - Terra Nova Development - Canada-Newfoundland Benefits Plan

    International Nuclear Information System (INIS)

    1996-01-01

    The Canada-Newfoundland Benefits Plan, part of the overall application to develop the Terra Nova Field off the coast of Newfoundland details the benefits to Canadians, but most particularly to residents of Newfoundland and Labrador that a vibrant petroleum industry is expected to bring. In this document the proponents commit themselves to a course of action designed to enhance the opportunities for Canadian and Newfoundland participation in the development, in accordance with the Atlantic Accord legislation. In terms of this legislation, the project proponents are obliged to perform development functions from Newfoundland, acquire goods and services for the Terra Nova Development on a 'best value' basis, but consistent with the procurement policies and procedures for benefits. The proponents must consider Canadian and, in particular, Newfoundland benefits as one of the factors in the procurement of goods and services, and require contactors and subcontractors to adhere to the development's benefits principles, objectives and commitments. A 7-page glossary is also included

  9. Modeling of Crystalline Silicotitanate Ion Exchange Columns

    International Nuclear Information System (INIS)

    Walker, D.D.

    1999-01-01

    Non-elutable ion exchange is being considered as a potential replacement for the In-Tank Precipitation process for removing cesium from Savannah River Site (SRS) radioactive waste. Crystalline silicotitanate (CST) particles are the reference ion exchange medium for the process. A major factor in the construction cost of this process is the size of the ion exchange column required to meet product specifications for decontaminated waste. To validate SRS column sizing calculations, SRS subcontracted two reknowned experts in this field to perform similar calculations: Professor R. G. Anthony, Department of Chemical Engineering, Texas A ampersand 038;M University, and Professor S. W. Wang, Department of Chemical Engineering, Purdue University. The appendices of this document contain reports from the two subcontractors. Definition of the design problem came through several meetings and conference calls between the participants and SRS personnel over the past few months. This document summarizes the problem definition and results from the two reports

  10. A national computerized system for monitoring operational radiation exposure

    International Nuclear Information System (INIS)

    Canipelle, A.D.

    1996-01-01

    In parallel to the expansion of the number of French nuclear power plant units in operation, maintenance actions have multiplied, which has meant calling upon the services of a growing number of increasingly specialized workers. It has therefore proved necessary to reinforce the radiation dose rate surveillance of these workers. As a result, certain companies decided to set up their own occupational radiation dose monitoring system, in addition to mandatory monitoring by the OPRI, using dosemeters, generally electronic or thermoluminescent film badges, supplied by the subcontractor companies or nuclear facility operators. This enables acquiring fast and accurate knowledge of the radiation doses received by the workers. For this type of surveillance to be fully efficient, a data centralization system was required, able to provide frequent, even daily readings if necessary, of the dose received during the current month or for any period of time, up to the sum of the doses accumulated over five years. (author)

  11. Quality control and assurance in building the Dukovany nuclear power plant - check on and filing of quality certificates

    International Nuclear Information System (INIS)

    Sokola, J.

    1986-01-01

    The following documents were used for determining the range of documentation required for the construction of the Dukovany nuclear power plant: the decree valid in Czechoslovakia for all industrial structures, the respective Czechoslovak State and branch standards and several special Soviet regulations. For the central recording of all documents on the quality of deliveries and assemblies a special quality assurance unit was set up on the site of the nuclear power plant. In the system of the flow of documents on the quality of the structure of the Dukovany nuclear power plant there are 16 addressees, from outside subcontractors to on-site managerial staff, work safety inspectors, etc., to the enterprise archives and the department of scientific and technical information. A brief description is presented of the different types of documents on the quality of deliveries and assemblies, and the method of inspection of their content and completeness is described. (Z.M.)

  12. Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL

    International Nuclear Information System (INIS)

    1994-10-01

    The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project

  13. ICT & innovation: a case of integration in a regional construction firm

    Directory of Open Access Journals (Sweden)

    Graham Brewer

    2013-09-01

    Full Text Available Construction firms in regional areas face considerable challenges to their competitiveness. Logistics, availability of suitable personnel, unfamiliarity with trading partners, and the tyranny of distance conspire to obstruct profitable engagement beyond their local area. Electronic information and communication technology (ICT such as web-based project management applications and other forms of collaborative data sharing have the potential to mitigate many of these obstacles, but have yet to gain widespread acceptance, particularly by smaller regional firms who question their cost effectiveness. The attitudes of decision-makers and the impact of their decisions on intra- and inter-firm culture lie at the heart of ICT-mediated innovation. This paper presents a case study of a specialist subcontractor located in regional New South Wales and its involvement in a New Zealand project, whose competitiveness arose from using ICT to integrate its own supply chain. It also provided additional value by triggering collaboration and integration in the broader project team. The case reveals that these outcomes were symptomatic of the organisational culture of the subcontractor, and were achieved through a combination of leadership, collaboration, flexibility and pragmatism, redolent of dynamic capabilities. 

  14. ICT & innovation: a case of integration in a regional construction firm

    Directory of Open Access Journals (Sweden)

    Graham Brewer

    2013-09-01

    Full Text Available Construction firms in regional areas face considerable challenges to their competitiveness. Logistics, availability of suitable personnel, unfamiliarity with trading partners, and the tyranny of distance conspire to obstruct profitable engagement beyond their local area. Electronic information and communication technology (ICT such as web-based project management applications and other forms of collaborative data sharing have the potential to mitigate many of these obstacles, but have yet to gain widespread acceptance, particularly by smaller regional firms who question their cost effectiveness. The attitudes of decision-makers and the impact of their decisions on intra- and inter-firm culture lie at the heart of ICT-mediated innovation. This paper presents a case study of a specialist subcontractor located in regional New South Wales and its involvement in a New Zealand project, whose competitiveness arose from using ICT to integrate its own supply chain. It also provided additional value by triggering collaboration and integration in the broader project team. The case reveals that these outcomes were symptomatic of the organisational culture of the subcontractor, and were achieved through a combination of leadership, collaboration, flexibility and pragmatism, redolent of dynamic capabilities.

  15. Subcontracting in nuclear industry - legal aspects

    International Nuclear Information System (INIS)

    Leger, M.

    2012-01-01

    This article describes the legal framework of subcontracting in France. Subcontracting is considered as a normal mode of functioning for an enterprise: an enterprise contracts another enterprise to do what it can not do itself or does not want to do. According to the 1975 law, cascade subcontracting is allowed but subcontractors have to be accepted by the payer. In some cases the payer can share responsibility when the subcontracting enterprises do not comply to obligations like the payment of some taxes. The main subcontractor who is the one who contracted with the payer is the only one responsible for the right execution of the whole contract. In nuclear industry there are 2 exceptions to the freedom of subcontracting. The first one concerns radiation protection: in a nuclear facility the person in charge of radioprotection must be chosen among the staff. The second concerns the operations and activities that are considered important for radiation protection, it is forbidden to subcontract them. In some cases like maintenance in nuclear sector the law imposes some qualification certification for subcontracting enterprises. The end of the article challenges the common belief about subcontracting in nuclear industry. (A.C.)

  16. Functional requirements of road lighting.

    NARCIS (Netherlands)

    Schreuder, D.A.

    1975-01-01

    The functional, technical and visual requirements for public lighting are discussed. The improvement of the presentation of information to the road user is the main functional requirement. The visual requirements can be deduced from the functional requirement of enabling drivers to follow the

  17. Utility requirements for fusion

    International Nuclear Information System (INIS)

    Vondrasek, R.J.

    1982-02-01

    This report describes work done and results obtained during performance of Task 1 of a study of Utility Requirements and Criteria for Fusion Options. The work consisted of developing a list of utility requirements for fusion optics containing definition of the requirements and showing their relative importance to the utility industry. The project team members developed a preliminary list which was refined by discussions and literature searches. The refined list was recast as a questionnaire which was sent to a substantial portion of the utility industry in this country. Forty-three questionnaire recipients responded including thirty-two utilities. A workshop was held to develop a revised requirements list using the survey responses as a major input. The list prepared by the workshop was further refined by a panel consisting of vice presidents of the three project team firms. The results of the study indicate that in addition to considering the cost of energy for a power plant, utilities consider twenty-three other requirements. Four of the requirements were judged to be vital to plant acceptability: Plant Capital Cost, Financial Liability, Plant Safety and Licensability

  18. Engineering Requirements for crowds

    Directory of Open Access Journals (Sweden)

    Rogeiro Silva

    2015-12-01

    Full Text Available In the software project the interested parts are highly distributed and form numerous and heterogeneous groups, online or face, constituting what could be called crowds. The development of social applications and cloud computing and mobile has generated a marked increase in environments based requirements in crowds. Technical Requirements Engineering (RE traditional face these scalability issues, and require the co-presence of interested and engineers in joint meetings that can not be made in common physical environments. While different approaches have been introduced to partially automate RE in these contexts, still is required a multi-method approach to semi-automate all activities related to work with crowds. In this paper is propose an approach that integrates existing elicitation techniques and requirements analysis and is complemented by introducing new concepts. The information is collected through direct interaction and social collaboration, and through data mining techniques.

  19. Remedial action and waste disposal project -- 100-DR-1 remedial action readiness assessment report

    International Nuclear Information System (INIS)

    April, J.G.; Ard, J.A.; Corpuz, F.M.; DeMers, S.K.; Donahoe, R.L.; Frank, J.M.; Hobbs, B.J.; Roeck, F.V.

    1997-02-01

    This readiness assessment report presents the results of the project readiness assessment for the 100-DR-1 source sites remediation. The assessment was conducted at the conclusion of a series of project activities that began in August 1996. These activities included confirming the completion of project-specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, and mobilization and construction of site support systems

  20. WRAP TRUPACT loading systems operational test report

    International Nuclear Information System (INIS)

    DOSRAMOS, E.V.

    1999-01-01

    This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion

  1. Maintenance, a global approach

    International Nuclear Information System (INIS)

    Calmejane, P.

    2001-01-01

    Maintenance is an important economic activity, it can represent up to 40% of operating costs in some fabrication units. The opening of energy markets to competition has led main operators to center their activities on their basis business and to sub-contract subsidiary activities. Subcontracting with strong engagements from the sub-contractor about results, time allowed and costs is now currently applied in nuclear industry. (A.C.)

  2. Neutrosophy for software requirement prioritization

    Directory of Open Access Journals (Sweden)

    Ronald Barriga Dias

    2017-09-01

    Full Text Available Software engineers are involved in complex decisions that require multiples viewpoints. A specific case is the requirement prioritization process. This process is used to decide which software requirement to develop in certain release from a group of candidate requirements. Criteria involved in this process can involve indeterminacy. In this paper a software requirement prioritization model is develop based SVN numbers. Finally, an illustrative example is presented in order to show the proposed model.

  3. Tests for manufacturing technology of disposal canisters for nuclear spent fuel

    International Nuclear Information System (INIS)

    Raiko, H.; Salonen, T.; Meuronen, I.; Lehto, K.

    1999-06-01

    The summary and status of the results of the manufacturing technology programmes concerning the disposal canister for spent nuclear fuel conducted by Posiva Oy are given in this report. Posiva has maintained a draft plan for a disposal canister design and an assessment of potential manufacturing technologies for about ten years in Finland. Now, during the year 1999, the first full scale demonstration canister is manufactured in Finland. The technology used for manufacturing of this prototype is developed by Posiva Oy mainly in co-operation with domestic industry. The main partner in developing the manufacturing technology for the copper shell has been Outokumpu Poricopper Oy, Pori, Finland, and the main partner in developing the technology for the iron insert of the canister has been Valmet Oyj Rautpohja Foundry, Jyvaeskylae, Finland. In both areas many subcontractors have been used, predominantly domestic engineering workshops, but also some foreign subcontractors, e.g. for EB-welding, who have had large enough welding equipment. This report describes the developing programmes for canister manufacturing, evaluates the results and presents some alternative methods, and tries to evaluate the pros and contras of them. In addition, the adequacy of the achieved technological know-how is assessed in respect of the required quality of the disposal canister. The following manufacturing technologies have been the concrete topics of the development programme: Electron beam welding technology development for thick-walled copper, Casting of massive copper billets, Hot rolling of thick-walled copper plates, Hot pressing and forging in lid manufacture, Extrusion and drawing of copper tubes, Bending of copper plates by roller or press, Machining of copper, Residual stress removal by heat treatment, Non-destructive testing, Long-term strength of EB-welds, Casting and machining of the iron insert of the canister The specialists from all the main developing partner companies have

  4. Nuclear safety culture in Finland and Sweden - Developments and challenges

    International Nuclear Information System (INIS)

    Reiman, T.; Pietikaeinen, E.; Kahlbom, U.; Rollenhagen, C.

    2011-02-01

    The project aimed at studying the concept of nuclear safety culture and the Nordic nuclear branch safety culture. The project also aimed at looking how the power companies and the regulators view the current responsibilities and role of subcontractors in the Nordic nuclear safety culture as well as to inspect the special demands for safety culture in subcontracting chains. Interview data was collected in Sweden (n = 14) and Finland (n = 16) during 2009. Interviewees represented the major actors in the nuclear field (regulators, power companies, expert organizations, waste management organizations). Results gave insight into the nature and evaluation of safety culture in the nuclear industry. Results illustrated that there is a wide variety of views on matters that are considered important for nuclear safety within the Nordic nuclear community. However, the interviewees considered quite uniformly such psychological states as motivation, mindfulness, sense of control, understanding of hazards and sense of responsibility as important for nuclear safety. Results also gave insight into the characteristics of Nordic nuclear culture. Various differences in safety cultures in Finland and Sweden were uncovered. In addition to the differences, historical reasons for the development of the nuclear safety cultures in Finland and Sweden were pointed out. Finally, results gave implications that on the one hand subcontractors can bring new ideas and improvements to the plants' practices, but on the other hand the assurance of necessary safety attitudes and competence of the subcontracting companies and their employees is considered as a challenge. The report concludes that a good safety culture requires a deep and wide understanding of nuclear safety including the various accident mechanisms of the power plants as well as a willingness to continuously develop one's competence and understanding. An effective and resilient nuclear safety culture has to foster a constant sense of

  5. Postmarket Requirements and Commitments

    Data.gov (United States)

    U.S. Department of Health & Human Services — Provides information to the public on postmarket requirements and commitments. The phrase postmarket requirements and commitments refers to studies and clinical...

  6. 40 CFR 63.2343 - What are my requirements for emission sources not requiring control?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my requirements for emission sources not requiring control? 63.2343 Section 63.2343 Protection of Environment ENVIRONMENTAL PROTECTION... (Non-Gasoline) What This Subpart Covers § 63.2343 What are my requirements for emission sources not...

  7. Requirements for existing buildings

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    This report collects energy performance requirements for existing buildings in European member states by June 2012.......This report collects energy performance requirements for existing buildings in European member states by June 2012....

  8. Safety Requirements and Modern Technical Requirements in Human Information Systems in Amman Hotels

    OpenAIRE

    Farouq Ahmad Alazzam; Sattam Rakan Allahawiah; Mohammad Nayef Alsarayreh; Kafa Hmoud Abdallah al Nawaiseh

    2015-01-01

    This study aimed to demonstrate the availability of Safety requirements and modern technical requirements in human information systems in Amman hotels. an the most important results of this study is the availability of security and safety requirements in human information systems In Amman hotels and The adequacy of the information that it provided .and show that all departments are not connected by appropriate and effective communication networks in adequate form . Also sophisticated operatin...

  9. Autonomous Real Time Requirements Tracing

    Science.gov (United States)

    Plattsmier, George; Stetson, Howard

    2014-01-01

    One of the more challenging aspects of software development is the ability to verify and validate the functional software requirements dictated by the Software Requirements Specification (SRS) and the Software Detail Design (SDD). Insuring the software has achieved the intended requirements is the responsibility of the Software Quality team and the Software Test team. The utilization of Timeliner-TLX(sup TM) Auto- Procedures for relocating ground operations positions to ISS automated on-board operations has begun the transition that would be required for manned deep space missions with minimal crew requirements. This transition also moves the auto-procedures from the procedure realm into the flight software arena and as such the operational requirements and testing will be more structured and rigorous. The autoprocedures would be required to meet NASA software standards as specified in the Software Safety Standard (NASASTD- 8719), the Software Engineering Requirements (NPR 7150), the Software Assurance Standard (NASA-STD-8739) and also the Human Rating Requirements (NPR-8705). The Autonomous Fluid Transfer System (AFTS) test-bed utilizes the Timeliner-TLX(sup TM) Language for development of autonomous command and control software. The Timeliner-TLX(sup TM) system has the unique feature of providing the current line of the statement in execution during real-time execution of the software. The feature of execution line number internal reporting unlocks the capability of monitoring the execution autonomously by use of a companion Timeliner-TLX(sup TM) sequence as the line number reporting is embedded inside the Timeliner-TLX(sup TM) execution engine. This negates I/O processing of this type data as the line number status of executing sequences is built-in as a function reference. This paper will outline the design and capabilities of the AFTS Autonomous Requirements Tracker, which traces and logs SRS requirements as they are being met during real-time execution of the

  10. Streamlining environmental product declarations: a stage model

    Science.gov (United States)

    Lefebvre, Elisabeth; Lefebvre, Louis A.; Talbot, Stephane; Le Hen, Gael

    2001-02-01

    General public environmental awareness and education is increasing, therefore stimulating the demand for reliable, objective and comparable information about products' environmental performances. The recently published standard series ISO 14040 and ISO 14025 are normalizing the preparation of Environmental Product Declarations (EPDs) containing comprehensive information relevant to a product's environmental impact during its life cycle. So far, only a few environmentally leading manufacturing organizations have experimented the preparation of EPDs (mostly from Europe), demonstrating its great potential as a marketing weapon. However the preparation of EPDs is a complex process, requiring collection and analysis of massive amounts of information coming from disparate sources (suppliers, sub-contractors, etc.). In a foreseeable future, the streamlining of the EPD preparation process will require product manufacturers to adapt their information systems (ERP, MES, SCADA) in order to make them capable of gathering, and transmitting the appropriate environmental information. It also requires strong functional integration all along the product supply chain in order to ensure that all the information is made available in a standardized and timely manner. The goal of the present paper is two fold: first to propose a transitional model towards green supply chain management and EPD preparation; second to identify key technologies and methodologies allowing to streamline the EPD process and subsequently the transition toward sustainable product development

  11. The Integration of SME'S into Fusion Projects - Especially for the Manufacturing of Components for W7-X

    International Nuclear Information System (INIS)

    Heyn, K.; Scheller, H.; Andersson, H.

    2006-01-01

    The Consortium of Babcock Noell in Wuerzburg (Germany) and Ansaldo Superconduttori in Genoa (Italy) is producing the 50 nonplanar superconducting coils for the W7-X project. For the realization of the W7-X coils, especially for the manufacturing of the different components, an international network of companies is used, among them several SME's: highly specialized small and medium size enterprises. One of these SME's, which surpassed itself, is the Swedish foundry oesterby Gjuteri AB which has produced the stainless steel coil casings for W7-X. The design of the SS casings was changed by the customer after placing the contact. This has caused the question to manufacture the halfrings with cast segments or as entire castings, which lead finally to the contact with oesterby. A lot of effort was necessary to design the 10 different patterns for the 5 types of casings each consisting of 2 halfrings. The qualification of the SS grade for the high requirements of the project, among them the low cobalt content or the required mechanical properties at 4 K needed some time. Further on a lot of investigations about the test procedures were necessary to be applied for the special geometry of the product, for the 3D measurements or the NDT. The conventional x-ray was not completely suitable for this product due to the thickness of the material in some areas. The main production steps for each halfring will be presented in the paper. The testing includes different NDT, the material tests at RT and 4 K and the 3D measurement. The first casing was delivered end of 2001 and the last in autumn 2005 after several unexpected interruptions. All were treated in a close contact with the customer and in good collaboration between oesterby and BNG and have lead to a significant increase of competence on both sides. Several other SME's are involved in the network for W7-X realization. There are for example: C-CON in Rottenburg and its subcontractors PEM and KUKA in Schwarzenberg for Final

  12. Utility requirements for fusion power

    International Nuclear Information System (INIS)

    DeBellis, R.J.

    1977-03-01

    A four-man month study was undertaken to identify utility requirements of fusion power and define a role for the utilities in the fusion development process during the 1980s. This report, preliminary in nature, serves mainly as a planning document for future requirements analyses. A requirements organization was defined to consist of three major chronological phases: research and development, plant installation, and plant operation. Thirty-seven requirements were identified, covering all categories. In addition, training, environment, safety, licensing, and utility model were identified as five matrix-type requirements. As the requirement definition process continued during the study period, comments received from utility representatives revealed a consistency of key issues in the fusion development process. These issues form the basis for the eventual establishment of definitive roles for the utilities during the 1980s. The issues are not meant to reflect a negative view of fusion, but are items that must be solved before fusion can be introduced commercially as an electrical power source. As a result of this requirements study, preliminary candidate roles for the utilities in the fusion development process during the 1980s were identified as public education, commercialization studies, industry investment analyses, training plan implementation, alternate reactor concept development, ERDA concept design review, and requirements refinement

  13. Creativity in Requirement Identification

    DEFF Research Database (Denmark)

    Sørensen, Lene Tolstrup; Olesen, Henning

    Traditional requirements engineering focuses mainly on analysis and elicitation. However, current trends in new system, device and software are towards involving all stakeholders in the early stages of the engineering process to define the user requirements. Creativity is here seen as a major...... keystone in this process in order to open up stakeholder's mind to new technologies, which do not yet exist. This paper dis-cusses the application of creativity in the requirements process and illustrate through cases from the MAGNET and MAGNET Beyond projects....

  14. Capital Requirements and Banks' Leniency

    DEFF Research Database (Denmark)

    Dietrich, J. Kimball; Wihlborg, Clas

    2003-01-01

    We investigate the effect of changes in capital regulation on the strictness(leniency) of loan terms using a simple model of bank capital requirements andasset quality examinations. Banks offer different levels of `leniency' in the senseof willingness to offer automatic extensions of loans...... rates. As capital requirements increase thedifference between initial capital levels and between interest rates of strict andlenient banks decrease. Thus, higher capital requirements in recessions tend toreduce the interest rate premium paid for leniency. If a recession is interpreted asan increase...... in the required return, the interest rate premium paid for leniency isincreased in recession at a given level of required capital....

  15. Capturing security requirements for software systems.

    Science.gov (United States)

    El-Hadary, Hassan; El-Kassas, Sherif

    2014-07-01

    Security is often an afterthought during software development. Realizing security early, especially in the requirement phase, is important so that security problems can be tackled early enough before going further in the process and avoid rework. A more effective approach for security requirement engineering is needed to provide a more systematic way for eliciting adequate security requirements. This paper proposes a methodology for security requirement elicitation based on problem frames. The methodology aims at early integration of security with software development. The main goal of the methodology is to assist developers elicit adequate security requirements in a more systematic way during the requirement engineering process. A security catalog, based on the problem frames, is constructed in order to help identifying security requirements with the aid of previous security knowledge. Abuse frames are used to model threats while security problem frames are used to model security requirements. We have made use of evaluation criteria to evaluate the resulting security requirements concentrating on conflicts identification among requirements. We have shown that more complete security requirements can be elicited by such methodology in addition to the assistance offered to developers to elicit security requirements in a more systematic way.

  16. Capturing security requirements for software systems

    Directory of Open Access Journals (Sweden)

    Hassan El-Hadary

    2014-07-01

    Full Text Available Security is often an afterthought during software development. Realizing security early, especially in the requirement phase, is important so that security problems can be tackled early enough before going further in the process and avoid rework. A more effective approach for security requirement engineering is needed to provide a more systematic way for eliciting adequate security requirements. This paper proposes a methodology for security requirement elicitation based on problem frames. The methodology aims at early integration of security with software development. The main goal of the methodology is to assist developers elicit adequate security requirements in a more systematic way during the requirement engineering process. A security catalog, based on the problem frames, is constructed in order to help identifying security requirements with the aid of previous security knowledge. Abuse frames are used to model threats while security problem frames are used to model security requirements. We have made use of evaluation criteria to evaluate the resulting security requirements concentrating on conflicts identification among requirements. We have shown that more complete security requirements can be elicited by such methodology in addition to the assistance offered to developers to elicit security requirements in a more systematic way.

  17. Capturing security requirements for software systems

    Science.gov (United States)

    El-Hadary, Hassan; El-Kassas, Sherif

    2014-01-01

    Security is often an afterthought during software development. Realizing security early, especially in the requirement phase, is important so that security problems can be tackled early enough before going further in the process and avoid rework. A more effective approach for security requirement engineering is needed to provide a more systematic way for eliciting adequate security requirements. This paper proposes a methodology for security requirement elicitation based on problem frames. The methodology aims at early integration of security with software development. The main goal of the methodology is to assist developers elicit adequate security requirements in a more systematic way during the requirement engineering process. A security catalog, based on the problem frames, is constructed in order to help identifying security requirements with the aid of previous security knowledge. Abuse frames are used to model threats while security problem frames are used to model security requirements. We have made use of evaluation criteria to evaluate the resulting security requirements concentrating on conflicts identification among requirements. We have shown that more complete security requirements can be elicited by such methodology in addition to the assistance offered to developers to elicit security requirements in a more systematic way. PMID:25685514

  18. Hanford Site Biological Resources Mitigation Strategy

    International Nuclear Information System (INIS)

    Sackschewsky, Michael R

    2003-01-01

    The Biological Resources Mitigation Strategy (BRMiS), as part of a broader biological resource policy, is designed to aid the U.S. Department of Energy, Richland Operations Office (DOE-RL) in balancing its primary missions of waste cleanup, technology development, and economic diversification with its stewardship responsibilities for the biological resources it administers. This strategy will be applied to all DOE-RL programs as well as all contractor and subcontractor activities

  19. Gaining Leverage Over Vendor Lock to Improve Acquisition Performance and Cost Efficiencies

    Science.gov (United States)

    2014-04-30

    Virginia Wydler, MITRE Corporation Open Systems Architecture License Rights: A New Era for the Public– Private Market -Place Nickolas Guertin, DASN RDT...if only one vendor can replace or upgrade those key components, that de facto monopolist may be able to exert excess negotiating leverage over...instead of sole source subcontractor procurement. The Program Office should have the prime vendor to provide a full market research data in accordance

  20. Human Factors in Aviation Maintenance. Phase 3. Volume 1. Progress Report

    Science.gov (United States)

    1993-08-01

    As a subcontractor for Galaxy Scientific, Dr. Colin Drury at the State University at New York at Buffalo is conducting a substantial research program...taxonomy. In addition, however, Dr. Drury has developed a simulated NDI task, using a SUN workstation, that incorporates the physical aspects and...to both total task time and to the decision criterion used. Drury clearly feels, with some justification, that intensive investigation of individual